  1. 0:00Hi. Welcome to another episode of
  2. 0:02ColdFusion. $650 billion.
  3. 0:05That's the amount four tech companies
  4. 0:07were expected to spend in 2026 alone for
  5. 0:10new data centers.
  6. 0:11>> [music]
  7. 0:12>> To put $650 billion into perspective,
  8. 0:15stack that amount in a $100 bills and
  9. 0:17the pile would rise 710 km, clearing the
  10. 0:20orbit of the International Space Station
  11. 0:22by over 300 km. And the plan is to get
  12. 0:25this number up to 9 trillion by 2030.
  13. 0:29And yet with so much money allocated to
  14. 0:31this, nearly half of the data centers
  15. 0:32planned to open in the US this year have
  16. 0:34already been delayed or canceled
  17. 0:36outright. According to a report by
  18. 0:38Bloomberg, around 140 data center
  19. 0:40projects were supposed to open in the US
  20. 0:42this year. Together, they represent
  21. 0:44roughly 12 gigawatts of computing power,
  22. 0:47enough energy to power 9 million homes.
  23. 0:49But there's a problem. So far, a third
  24. 0:52of them are actually being built. The
  25. 0:54rest just sits entirely on paper, press
  26. 0:56releases and announcements.
  27. 0:58>> [music]
  28. 0:58>> In another report by the Financial
  29. 1:00Times, the data centers that are
  30. 1:01actually being built will likely face
  31. 1:03major delays. The companies involved in
  32. 1:06building them may deny that there are
  33. 1:07any delays, but satellite imagery says
  34. 1:10otherwise.
  35. 1:11>> But if you go and look at Microsoft, for
  36. 1:12example, none of the data centers that
  37. 1:14they have announced have broken ground
  38. 1:16since 2023 have actually been finished.
  39. 1:21The Fairwater data centers, they are
  40. 1:23con- they've said that that was fully
  41. 1:24complete. It's not even half complete.
  42. 1:27It's one of the strangest things I've
  43. 1:29seen in history.
  44. 1:30>> But beyond just the completion issue,
  45. 1:31the general public hates data centers.
  46. 1:34Between infrasound noise making people
  47. 1:36sick, polluted water, higher energy
  48. 1:38costs,
  49. 1:39>> [music]
  50. 1:39>> and a myriad of other problems, people
  51. 1:41have had enough. Because who's actually
  52. 1:43paying the price? Not the shareholders,
  53. 1:46not the companies collecting tax breaks.
  54. 1:48It's ordinary people, homeowners,
  55. 1:50families,
  56. 1:51>> [music]
  57. 1:51>> communities, those who happen to live a
  58. 1:53few hundred meters from one of these
  59. 1:55facilities. They never got much say in
  60. 1:57the matter.
  61. 1:58So, here's the question. If the world is
  62. 1:59spending so much money on AI
  63. 2:01infrastructure, how is it possible that
  64. 2:03that very infrastructure itself is
  65. 2:05falling apart before it even gets built?
  66. 2:07And is this finally the sign that many
  67. 2:09have been predicting?
  68. 2:11Let's get into it.
  69. 2:12>> [music]
  70. 2:13>> You are watching ColdFusionTV.
  71. 2:18>> [music]
  72. 2:20>> I love to hear your perspective, not on
  73. 2:22the spend, but on the return needed to
  74. 2:24make those numbers work.
  75. 2:26>> They'll never get it.
  76. 2:28Yeah, they're they're they're just
  77. 2:29away that money.
  78. 2:33Right, we're going to spend a trillion
  79. 2:35dollars cuz we need all this data center
  80. 2:37capacity. Some of them are spending more
  81. 2:39cash than they have available.
  82. 2:41>> They're away the money at
  83. 2:42scale.
  84. 2:44It's hard to do, right? But
  85. 2:46>> [laughter]
  86. 2:47>> When the AI boom exploded into public
  87. 2:49[music] consciousness with ChatGPT in
  88. 2:51late 2022, the race to build the
  89. 2:53underlying infrastructure became almost
  90. 2:56frenzied. Data centers became the
  91. 2:58hottest asset class on the planet.
  92. 2:59Investors poured in and governments
  93. 3:01competed.
  94. 3:03Nowhere was the build-out more intense
  95. 3:05than the United [music] States. Last
  96. 3:06year, it was estimated that 92% of US
  97. 3:09GDP growth came from data center
  98. 3:12spending. If you remove AI
  99. 3:13infrastructure, the rest of the economy
  100. 3:15grew by 0.1%.
  101. 3:18That's why the stock market skyrocketing
  102. 3:20felt so out of touch.
  103. 3:22And to give you an idea of where we're
  104. 3:23at, the shoe company Allbirds recently
  105. 3:26announced that they're pivoting to focus
  106. 3:27on leasing AI data center equipment. It
  107. 3:30made no sense, but their stock rallied
  108. 3:32580% as a result. All the signs are
  109. 3:35here. Data centers are in vogue.
  110. 3:38The pitch was simple. AI gets smarter
  111. 3:40the more computing power you give it.
  112. 3:42Computing power [music] comes from data
  113. 3:44centers. So, let's build data centers
  114. 3:46fast. In the US alone, the number of AI
  115. 3:49data centers went from essentially zero
  116. 3:51a decade ago to somewhere between 4,000
  117. 3:53and 5,400 today. The pace and scale of
  118. 3:57the build-out was so violent that more
  119. 3:59money has been committed to data centers
  120. 4:01in 6 years than was given to the
  121. 4:02Marshall Plan to rebuild Europe after
  122. 4:04World War
  123. 4:05>> [music]
  124. 4:05>> II, the Manhattan Project to build the
  125. 4:07atomic bomb, the entire Apollo program,
  126. 4:09and the cost of the International Space
  127. 4:11Station combined with a $120 billion
  128. 4:14extra left over.
  129. 4:16All of this spending for a business plan
  130. 4:18that isn't even solid yet. And besides,
  131. 4:21GPUs rapidly become outdated, [music]
  132. 4:23and they become expensive to keep
  133. 4:24replacing. I'm not saying that AI is
  134. 4:26never going to work, but is it going
  135. 4:29[music] to be profitable in the time
  136. 4:31frame that's needed for funding not to
  137. 4:32completely collapse? It's looking less
  138. 4:35likely. It's perfectly possible that
  139. 4:37this is all a huge waste of money.
  140. 4:40>> So, when you think about all these
  141. 4:41people spending all this money, look, if
  142. 4:44you're the best programming, you know,
  143. 4:46like Claude is, and that's your niche,
  144. 4:48great. But I don't know what the niche
  145. 4:50of these other ones are. Do you?
  146. 4:53>> No.
  147. 4:54>> More than two of these facilities were
  148. 4:55being built every single week at the
  149. 4:57peak of the boom. States like Virginia,
  150. 4:59Texas, [music]
  151. 5:00Georgia, and Arizona were rolling out
  152. 5:02the red carpet. The tax breaks made the
  153. 5:05data center business even more
  154. 5:06attractive. [music] Texas, for example,
  155. 5:08handed out over $1 billion in incentives
  156. 5:10for the Stargate project alone. The $500
  157. 5:13billion Open AI and Oracle AI campus in
  158. 5:15Abilene.
  159. 5:17Virginia, home to what's known as Data
  160. 5:18Center Alley in Loudoun County, saw 56
  161. 5:21data center projects [music] receive
  162. 5:22nearly a billion dollars in tax savings
  163. 5:24in a single fiscal year.
  164. 5:27The promises attached to all of this
  165. 5:28were enormous. Thousands of jobs, a new
  166. 5:31digital industrial revolution. One
  167. 5:33analyst compared it to the railroad boom
  168. 5:35of the 19th century. [music] The
  169. 5:36reality, however, is very different.
  170. 5:39The companies bringing in these
  171. 5:40facilities often receive property tax
  172. 5:42abatements for years, meaning the local
  173. 5:45community absorbs the infrastructure
  174. 5:46costs without the tax revenue in return.
  175. 5:50One report found Oregon schools lost 275
  176. 5:53million in potential tax income due to
  177. 5:55these [music] abatements.
  178. 5:56And those jobs that were promised, well,
  179. 5:58they rarely materialized at the scale
  180. 6:00suggested. [music]
  181. 6:01Even the largest data centers typically
  182. 6:03employ fewer than 150 permanent workers.
  183. 6:07The construction jobs are real and
  184. 6:08well-paid, but they're temporary and
  185. 6:10many are filled from people outside the
  186. 6:12state.
  187. 6:13The true cost on communities [music] has
  188. 6:15been baffling and we'll expand on this
  189. 6:17further in the next chapter, but we'll
  190. 6:18also see where the big data center
  191. 6:20build-out starts to fall apart.
  192. 6:23Now, you may not be transferring
  193. 6:24hundreds of billions to buy a data
  194. 6:26center, but if you're looking for a
  195. 6:27simple and secure way to manage your
  196. 6:29finances, then Revolut is a good option.
  197. 6:32Revolut is an all-in-one finance app
  198. 6:34designed to simplify spending at home
  199. 6:35and abroad. Over 75 million people are
  200. 6:38already on it. You can get $40 when you
  201. 6:40sign up to Revolut and make your first
  202. 6:42purchase. The offer is available in
  203. 6:44multiple countries, so check out the
  204. 6:46link in the description or the QR code
  205. 6:48on screen to learn more. One of their
  206. 6:50unique features [music] is how easy it
  207. 6:51is to generate single-use virtual cards,
  208. 6:54helping protect your payments whenever
  209. 6:55you're shopping online.
  210. 6:56>> [music]
  211. 6:56>> Because whenever you're making an online
  212. 6:58payment, it generates a one-time card
  213. 7:00number that can't be reused. [music]
  214. 7:02It massively reduces your risk of your
  215. 7:03card details being exposed online. On
  216. 7:05top of that, you can send or request
  217. 7:07money, make [music] payments, and split
  218. 7:09bills on the spot, even across different
  219. 7:11countries and currencies. [music] It
  220. 7:13just removes a lot of friction
  221. 7:14day-to-day. And then there's the card
  222. 7:16itself. You can customize it in the app
  223. 7:18and add it straight [music] to Apple Pay
  224. 7:19or Google Pay and make payments
  225. 7:21instantly or upgrade to their metal plan
  226. 7:23for a premium-looking clean stainless
  227. 7:25steel card. Revolut lets you organize
  228. 7:27all your finances in one place, instead
  229. 7:29of juggling multiple apps, accounts, and
  230. 7:31expensive fees. [music] So again, if you
  231. 7:33want to check it out, you can get $40
  232. 7:35when you sign up and make your first
  233. 7:37purchase. Just hit the link in the
  234. 7:38description or scan the QR code on
  235. 7:40screen to learn more. Thanks to Revolut
  236. 7:42for supporting ColdFusion. And now, back
  237. 7:44to the story.
  238. 7:46>> The AI bubble is about to burst because
  239. 7:48the hyperscalers, as they're called,
  240. 7:50[music]
  241. 7:50have used up all their own cash and are
  242. 7:53now borrowing money. They are
  243. 7:55effectively net debtors at a time when
  244. 7:58they're spending
  245. 8:00huge volumes of money on data centers
  246. 8:03without having any guarantee that
  247. 8:05they're going to earn
  248. 8:07uh
  249. 8:07>> [music]
  250. 8:08>> profits from that.
  251. 8:09And it's that worry that actually there
  252. 8:11isn't money to be made in that business,
  253. 8:13[music] which is gradually dawning on
  254. 8:16investors. And that's going to be why
  255. 8:18they are going to pull away. In fact,
  256. 8:20there's already signs of people
  257. 8:22withdrawing from the AI sector because
  258. 8:24they fear that this is a bubble. It
  259. 8:26seems [music] to be utterly inevitable.
  260. 8:28The question is only when.
  261. 8:31>> So, what went wrong?
  262. 8:32Well, the answer is a few things all at
  263. 8:35once. So, bear with me here as I try to
  264. 8:37get through them. At the top of the list
  265. 8:39is supply. Power is the first bottleneck
  266. 8:42for these data [music] centers. They're
  267. 8:43extraordinarily power hungry. One single
  268. 8:46large hyperscale facility can consume as
  269. 8:48much electricity as a city of 200,000
  270. 8:51homes. And the modern AI chips driving
  271. 8:53modern data centers, the GPU racks
  272. 8:55running models like Claude, Gemini,
  273. 8:57ChatGPT, and Grok [music]
  274. 8:59use significantly more power than the
  275. 9:01servers that came before them.
  276. 9:03According to Sideline Climate, around
  277. 9:0525% of planned 2026 projects haven't
  278. 9:09even disclosed how they plan to power
  279. 9:10themselves, which to me is insane. To
  280. 9:13add to this, all the main electrical
  281. 9:15components need to run these facilities,
  282. 9:17[music] the transformers, switchgear,
  283. 9:19batteries, they're all in critically
  284. 9:21short supply, and the majority [music]
  285. 9:23of which are imported from China. As
  286. 9:25Bloomberg puts it, "America's data
  287. 9:28center buildout hinges on Chinese
  288. 9:30imports." High power transformers from
  289. 9:32China surged from fewer than 1,500 units
  290. 9:35in 2022 to over 8,000 units in 2025.
  291. 9:39But, with geopolitical tensions and
  292. 9:41[music] tariffs disrupting supply
  293. 9:43chains, that pipeline has become
  294. 9:45unreliable. As one analyst put it, "If
  295. 9:47one piece of your supply chain is
  296. 9:49delayed, your whole project can't
  297. 9:51deliver." [music]
  298. 9:52Even skilled labor is a big issue. As
  299. 9:54this tweet puts it, {quote} "Meta can't
  300. 9:57hire fiber technicians fast enough, so
  301. 9:59now they're training them for free."
  302. 10:01{end quote}
  303. 10:02And that's because they need the people
  304. 10:03fast. So, basically, these tech giants
  305. 10:06aren't only short on equipment, but the
  306. 10:08people required to install them.
  307. 10:10The second big reason is the true cost
  308. 10:12of [music] these data centers. The
  309. 10:13community suffers.
  310. 10:15There's some crazy stats and stories
  311. 10:17we're going to cover here. In Virginia,
  312. 10:19it's estimated that residents are
  313. 10:20already breathing in the exhaust gases
  314. 10:22of 10,000 diesel generators.
  315. 10:25In Utah, there was an approval for a
  316. 10:2640,000-acre AI data center that would
  317. 10:29expel the heat equivalent of 23 atomic
  318. 10:31bombs into the surrounding valley every
  319. 10:33day.
  320. 10:34Upon its announcement, people went
  321. 10:36bananas. The owner of the data center,
  322. 10:39Kevin O'Leary, decided to shrink it to
  323. 10:41half the [music] size, citing that he
  324. 10:42had no choice.
  325. 10:44According to the UN, data centers will
  326. 10:46use as much water as 1.3 billion people
  327. 10:49by 2030. [music]
  328. 10:51The scale of some of these projects is
  329. 10:52baffling. A lot of people don't realize
  330. 10:54the magnitude of what's going on.
  331. 10:56>> The kind of AI data center that it's
  332. 10:58constructing now in Louisiana is nearly
  333. 11:00400 [music] times the size in footprint
  334. 11:04of the first data center that it built
  335. 11:05to support Facebook, its [music] social
  336. 11:07media platform. And that data center is
  337. 11:10on track to be 1/5 the size of
  338. 11:12Manhasset.
  339. 11:13>> [music]
  340. 11:13>> And it is on track to use around 5
  341. 11:15gigawatts of power, which is nearly the
  342. 11:17average power demand of London.
  343. 11:20That's it's it's one facility that would
  344. 11:22use the average power demand of a city
  345. 11:26like London.
  346. 11:27>> Wow.
  347. 11:28>> Meta wants to build more than one of
  348. 11:29these facilities, and of course, every
  349. 11:31single one of its competitors wants to
  350. 11:32build.
  351. 11:32>> that's just Meta.
  352. 11:33>> That's just one facility for Meta.
  353. 11:37>> He used that Meta data center in person,
  354. 11:39so he can really see the scale.
  355. 11:41>> You can start to see the lights from
  356. 11:42back here.
  357. 11:46I knew they were starting this, but I
  358. 11:47didn't know it was this impactful. Look
  359. 11:49at all the semi trucks, all the cement
  360. 11:51[music] trucks you'll drive by, and it
  361. 11:52just keeps going
  362. 11:55and going, it continues on for more
  363. 11:58and more. This Meta AI data center that
  364. 12:01they are putting in here that's taking
  365. 12:03up all of this beautiful farmland that
  366. 12:06we will never be able to replace, it's
  367. 12:08only going to employ 1 to 500 people.
  368. 12:12So, all this
  369. 12:14for about the same amount of jobs as my
  370. 12:16local Walmart.
  371. 12:18>> While writing this episode, I had a
  372. 12:20researcher from North Carolina reach out
  373. 12:21to me, and they were working on a data
  374. 12:23center documentary.
  375. 12:24This next clip will give you an idea of
  376. 12:26just how much permanent damage can be
  377. 12:27done to water via the cooling systems.
  378. 12:29>> How much water is this thing going to
  379. 12:31use? And he said 2 million gallons a
  380. 12:34day.
  381. 12:35>> Well, what about the the the
  382. 12:37contaminants, [music] the forever
  383. 12:38chemicals?
  384. 12:40>> We do know that they have to put
  385. 12:42additives, just like your car radiator,
  386. 12:44you have to put antifreeze in there to
  387. 12:47keep it from overheating or keep it from
  388. 12:49freezing. The additives generally be
  389. 12:51things like PFAS that won't stick
  390. 12:53[music] to metals, but also can't be
  391. 12:55removed from the water when it goes to a
  392. 12:58treatment plant.
  393. 12:59>> If you want to watch the documentary,
  394. 13:00I'll leave a link for it below. The data
  395. 13:02centers that did get built left a trail
  396. 13:04of grievances across the country.
  397. 13:06Residents living near facilities in
  398. 13:08Virginia, Georgia, and Texas report a
  399. 13:11consistent low frequency hum from the
  400. 13:13cooling system.
  401. 13:17Noise that vibrates through walls and
  402. 13:18disrupts sleep. One resident in
  403. 13:20Manassas, Virginia, spent $200,000 on
  404. 13:23installation and new windows and still
  405. 13:26can't escape the drone. In Georgia,
  406. 13:28families started finding heavy sediment
  407. 13:30in their taps after construction began
  408. 13:32nearby. And if somehow you can get
  409. 13:34through a good night's rest, you might
  410. 13:35wake up to an envelope with a massive
  411. 13:37electricity bill, and that's just to
  412. 13:38ruin the rest of your day. The Georgia
  413. 13:40Power Utilities company raised rates six
  414. 13:43times. That's right, six times between
  415. 13:462023 and 2025, a 24% jump, and that's
  416. 13:50because of data center demand. During
  417. 13:52that period, how many times do you think
  418. 13:54the wages of the residents in that area
  419. 13:56had risen? I can safely bet it's not
  420. 13:59six.
  421. 14:00In Oregon, Pacific Power consumers saw a
  422. 14:0250% increase in their bills since 2020.
  423. 14:05>> I think that we all collectively should
  424. 14:07just stop paying our electric bill,
  425. 14:08because this is getting out of hand.
  426. 14:10There has to be something that we
  427. 14:11collectively can do. $814
  428. 14:14for 1 month of electric? This is
  429. 14:16ridiculous. How do they expect people to
  430. 14:18be able to keep their lights on when the
  431. 14:20bill [music] is half of my mortgage?
  432. 14:22>> Sometimes it feels like a rush to see
  433. 14:24who can destroy the world the fastest.
  434. 14:26>> You know, I think AI will probably,
  435. 14:28like, most likely sort of lead to the
  436. 14:30end of the world, but in the meantime,
  437. 14:32uh, there will be great companies
  438. 14:33created with serious machine learning.
  439. 14:35>> And then we all know about the RAM
  440. 14:37issue. Chip markets have been thrown
  441. 14:38into complete chaos. I've already done
  442. 14:40an episode on this, but AI data centers
  443. 14:43are absorbing an estimated 70% of all
  444. 14:46global DRAM production capacity in 2026,
  445. 14:48and consumers suffer as a result. A
  446. 14:51standard 64GB DDR5 memory kit went from
  447. 14:54$190 to over $700 in just 3 months. And
  448. 14:59Sam Altman was to thank for that one. He
  449. 15:01promised to purchase 40% of global DRAM
  450. 15:04output from two manufacturers
  451. 15:05simultaneously, apparently without
  452. 15:07either one knowing about each other.
  453. 15:09When Micron learned the commitment
  454. 15:10wasn't legally binding, its stock
  455. 15:12dropped 22% in a single day.
  456. 15:15So naturally, all of this has led to
  457. 15:17backlash. Data center cancellations due
  458. 15:19to local opposition quadrupled in 2025.
  459. 15:23According to intelligence from the
  460. 15:24platform Heatmap Pro, at least 25
  461. 15:27projects were canceled that year due to
  462. 15:28community backlash, up from just six in
  463. 15:312024. And that number is accelerating.
  464. 15:34The will of the people may not last
  465. 15:36because the US government is watching
  466. 15:38this backlash closely, and the FBI has
  467. 15:39classified anti-AI sentiment as an
  468. 15:41emerging terrorist threat.
  469. 15:43>> If you've criticized AI or data centers,
  470. 15:45you may now be considered a domestic
  471. 15:48terrorist. US law enforcement warns of
  472. 15:51anti-tech extremism. The chaotic
  473. 15:54atmosphere that may result from emergent
  474. 15:56AI technology in the next 5 years may
  475. 15:58fuel large-scale protests that devolve
  476. 16:01into civil unrest and anti-tech violent
  477. 16:04extremist [music]
  478. 16:04activity. So, if you have ever protested
  479. 16:08AI publicly, you are now on a list.
  480. 16:11>> But despite the potential of ending up
  481. 16:13on an FBI watchlist, people are fighting
  482. 16:15back.
  483. 16:16>> THEY CANCELED IT!
  484. 16:18>> THEY WHAT?
  485. 16:19>> THEY CANCELED IT!
  486. 16:21>> [cheering]
  487. 16:24>> WE ARE GOING TO BE FIGHTING
  488. 16:26AGAINST DATA CENTERS EVERYWHERE IN NEW
  489. 16:29JERSEY.
  490. 16:31>> A RECENT Quinnipiac survey found a 65%
  491. 16:34of Americans now oppose data centers
  492. 16:36being built in their communities. Maine
  493. 16:38became the first US state to pass a
  494. 16:40statewide ban on data center
  495. 16:42construction, prohibiting new builds
  496. 16:44until late 2027.
  497. 16:4613 other states are now considering
  498. 16:48similar measures.
  499. 16:50This has become a kitchen table issue.
  500. 16:52Rising electricity bills, water use, and
  501. 16:54a sense that decisions are being made
  502. 16:56behind closed doors without any
  503. 16:58community input.
  504. 16:59>> One small town voted to prevent an AI
  505. 17:01data center from being built, but
  506. 17:03construction went ahead anyway. The town
  507. 17:06was sued by the developer, and a small
  508. 17:09town like Saline Township wouldn't be
  509. 17:10able to defend itself in a lawsuit.
  510. 17:13>> Illinois just approved a data center the
  511. 17:15size of 600 football fields. It will
  512. 17:18consume more than half the amount of
  513. 17:20electricity as the entire city of
  514. 17:22Chicago. But, the silver lining to this
  515. 17:24is that hundreds of community members
  516. 17:26came out to say no against this
  517. 17:28proposal. But, unfortunately, the city
  518. 17:31just didn't give a and approved it
  519. 17:33anyway. Remember, these are the same
  520. 17:35people that tell you to take shorter
  521. 17:37showers.
  522. 17:38>> And this all isn't just happening in the
  523. 17:39US.
  524. 17:40>> [music]
  525. 17:40>> In Australia, where I live, for some
  526. 17:42reason, we're planning to be the second
  527. 17:44largest data center [music] hub in the
  528. 17:45world.
  529. 17:46>> A quarter of Sydney's drinking water
  530. 17:48will soon be needed to power 270 new AI
  531. 17:52data centers. [music] Australia is
  532. 17:54getting set up to become the second
  533. 17:57biggest data center location in the
  534. 17:58world.
  535. 18:00>> I'm in Westfoot gray, and this is just
  536. 18:02one of the many data centers that have
  537. 18:04popped up around the area.
  538. 18:05>> We call it Mordor because it's so
  539. 18:07imposing over the whole neighborhood.
  540. 18:08You can literally see it from every
  541. 18:09corner.
  542. 18:10>> Australia's data centers are projected
  543. 18:12to use more new electricity than all of
  544. 18:14the country's homes and EVs over the
  545. 18:16next 15 years, and they have the
  546. 18:18potential to drive up power prices.
  547. 18:19[music]
  548. 18:20>> It's turned the opposition for data
  549. 18:21centers into a universal rallying cry,
  550. 18:23even in today's political landscape.
  551. 18:26Microsoft, meanwhile, has slowly
  552. 18:28canceled or deferred up to 2 gigawatts
  553. 18:31of planned data center capacity
  554. 18:32globally. Analysts at TD Cowen described
  555. 18:35the pullbacks as pointing to, quote,
  556. 18:37[music] data center oversupply relative
  557. 18:39to current demand forecasts, end quote.
  558. 18:42The famous Oracle Open AI startup
  559. 18:45campus, the one in Texas, reportedly
  560. 18:47quietly stalled its expansion amid
  561. 18:49ongoing supply and financial
  562. 18:51complications.
  563. 18:52Of course, they had to do it quietly
  564. 18:54because the speculation of the dreaded B
  565. 18:56word is just around the corner, the
  566. 18:58bubble.
  567. 19:02So, is the bubble popping? Uh, kind of.
  568. 19:04Probably not in the dramatic 2008-style
  569. 19:07collapse sense, but it's definitely a
  570. 19:08strong reality check. I've touched on
  571. 19:10this a few times in previous episodes,
  572. 19:12but there's a structural problem here.
  573. 19:14These investments are being made on the
  574. 19:16assumption that AI demand will grow
  575. 19:18exponentially and indefinitely. [music]
  576. 19:20It's still a big bet because the
  577. 19:22infrastructure spending is very real,
  578. 19:24but the returns, they're still
  579. 19:25speculative. For example, something as
  580. 19:28simple as open-source models could
  581. 19:29derail the whole thing. Who would pay
  582. 19:31$20 or $200 a month to get something
  583. 19:33that's only 20% better than an
  584. 19:35open-source model that's free? If
  585. 19:37there's much cheaper or free models that
  586. 19:39are 80% as good, company spending $1
  587. 19:42trillion to train frontier models seems
  588. 19:44ridiculous in comparison.
  589. 19:46>> We are talking in an industry that has
  590. 19:47absorbed over a trillion dollars in the
  591. 19:49last 3 years. The media attention from
  592. 19:52everyone and these continual stories
  593. 19:54about the magic of AI, but when you say,
  594. 19:57"Hey, is it making any money?" They go,
  595. 19:58"Oh, no. Oh, we couldn't possibly. Uh we
  596. 20:01we don't do that yet, but don't worry.
  597. 20:03Um Uber lost a lot of money. Uber burned
  598. 20:05about $32 billion, which is less than
  599. 20:08half of what Anthropic has raised in the
  600. 20:09last 6 months.
  601. 20:11>> But all of this hasn't stopped the talk
  602. 20:13of building data centers in space, but
  603. 20:15that's a story for another day. In terms
  604. 20:17of financing, the situation has become
  605. 20:19uncomfortable. It does echo previous
  606. 20:21cycles. Around $34 billion in data
  607. 20:24center bonds were issued recently with
  608. 20:2684% of them being rated A. That's a very
  609. 20:29safe level, low enough risk for pension
  610. 20:31funds to buy.
  611. 20:33But there's something fishy here. Those
  612. 20:35A-rated bonds are paying eight, nine, or
  613. 20:38sometimes 12% interest. That is junk
  614. 20:41bond level rates, and that implies
  615. 20:43there's a huge amount of risk. It's risk
  616. 20:45that credit ratings haven't acknowledged
  617. 20:47yet. And now, where have we seen this
  618. 20:49before? Hint, it rhymes with blue
  619. 20:52thousand and eight crisis. But this time
  620. 20:54though, it's not systematic in banks,
  621. 20:56but more so private investors and
  622. 20:57groups.
  623. 20:59The AI build-out assumed infinite
  624. 21:01political tolerance, infinite grid
  625. 21:03capacity, infinite supply chains, and
  626. 21:06infinite community patience. None of
  627. 21:08these assumptions held.
  628. 21:10At this point, this is what the AI data
  629. 21:12center build out kind of feels like.
  630. 21:14>> And in tech news, Open AI launched
  631. 21:16construction of a new data center in
  632. 21:18Greenville, Tennessee on top of a sick
  633. 21:20child today. The artificial intelligence
  634. 21:22company announced the data center will
  635. 21:23be positioned in the heart of the small
  636. 21:26race car themed bedroom where 8-year-old
  637. 21:28Billy Treacher fights a rare kidney
  638. 21:30disease on a daily basis. Engineers and
  639. 21:33surveyors began laying the groundwork
  640. 21:34for the data center this week, which
  641. 21:36they say will unleash up to 10 gigawatts
  642. 21:38of power annually once fully up and
  643. 21:40running on top of Stan and Rebecca
  644. 21:42Treacher's only child. Open AI
  645. 21:44executives say they plan on expanding
  646. 21:46out from Billy's sleeping area to his
  647. 21:48play and reading areas, as well as to
  648. 21:50the corner of his room where his mother
  649. 21:52sits in a rocking chair praying for her
  650. 21:54son's survival every night, all to
  651. 21:56guarantee ample space for their 10-ton
  652. 21:58processors to operate.
  653. 22:00>> To further understand how badly the
  654. 22:01build out is going, here's a quick
  655. 22:03story.
  656. 22:03>> [music]
  657. 22:03>> In June 2025, Fermi America, co-founded
  658. 22:07by former US Energy Secretary Rick
  659. 22:09Perry, announced Project Matador, later
  660. 22:12rebranded as the President Donald J.
  661. 22:13Trump Advanced Energy and Intelligence
  662. 22:16Campus,
  663. 22:17a 17-gigawatt AI mega project in the
  664. 22:19Texas Panhandle. It was one of the most
  665. 22:21ambitious data center proposals ever
  666. 22:23announced. But, in less than a year, the
  667. 22:26CEO had resigned, then the CFO followed
  668. 22:292 days later. The company still had no
  669. 22:31confirmed anchor tenant. That's the
  670. 22:33client who's going to be leasing the
  671. 22:34data centers. It's a basic prerequisite
  672. 22:36for any data center business. [music]
  673. 22:38Its market cap collapsed from nearly $20
  674. 22:41to $3.4 billion. The departing CEO
  675. 22:43admitted that he may have, quote,
  676. 22:45[music] misunderstood where the supply
  677. 22:47chain is, end quote, on cooling
  678. 22:49infrastructure. Quote, "I will accept
  679. 22:51that as a failure," he said.
  680. 22:54If the sitting president of the United
  681. 22:55States can't get his named data center
  682. 22:58off the ground, it tells you something
  683. 22:59for the broader state of the industry.
  684. 23:00[music]
  685. 23:01If compute capacity keeps getting
  686. 23:03constrained, there can be cancellations,
  687. 23:05community bans, or supply chain issues.
  688. 23:08The companies that depend on it, like
  689. 23:09OpenAI and Anthropic, face a very real
  690. 23:12growth ceiling that has nothing to do
  691. 23:13with the quality of their models.
  692. 23:15There's even speculation that that's why
  693. 23:17when a new model releases, it performs
  694. 23:19relatively well, but after a few months,
  695. 23:21it gets throttled down to save on
  696. 23:23compute costs.
  697. 23:24>> [music]
  698. 23:28>> Now, before we finish, [music] this
  699. 23:29wouldn't be complete without the other
  700. 23:30side of the coin. Are there sustainable
  701. 23:32ways to build data centers? Or do we
  702. 23:34even need massive data centers for AI at
  703. 23:36all? Well, for the first question, there
  704. 23:38is such a thing as subsea data centers.
  705. 23:41Underwater data centers almost sounds
  706. 23:42like something in science fiction, but
  707. 23:44they already exist in China. It includes
  708. 23:46deploying container-like capsules on the
  709. 23:48ocean floor, using the naturally cold
  710. 23:50seawater as a passive cooling system.
  711. 23:53One operator reports that 99% of the
  712. 23:55electricity goes directly to computing
  713. 23:57compared to roughly 50% in traditional
  714. 23:59air-cooled facilities.
  715. 24:01Do we even need big data [music]
  716. 24:03centers? Recently, local AI models have
  717. 24:05become more common. Instead of using a
  718. 24:07billion-dollar data center, just use
  719. 24:09smaller models that run locally on your
  720. 24:11device. If it's 80% as good, then most
  721. 24:13users will be satisfied for simple
  722. 24:15tasks. Apple's large unified memory is a
  723. 24:18leading example of the kind of local
  724. 24:19hardware that enables this.
  725. 24:21It could be that in 3 years, when most
  726. 24:24laptops can run decent models, the
  727. 24:26demand for centralized infrastructure
  728. 24:27drops. The data center doesn't
  729. 24:29disappear, but it gets smaller and less
  730. 24:32intrusive.
  731. 24:33And then there's the argument that in
  732. 24:35the future, all mainstream LLMs will
  733. 24:37become a commodity. Even Larry Ellison
  734. 24:39hints at this. Although his solution is,
  735. 24:41>> [music]
  736. 24:41>> well, typical of him.
  737. 24:44>> So, if you look at ChatGPT,
  738. 24:46>> [music]
  739. 24:46>> Anthropic,
  740. 24:48Llama, what what have you, they're all
  741. 24:50trained on all of the data on the
  742. 24:52internet. In other words, publicly
  743. 24:54available data. But
  744. 24:57for these models to reach their peak
  745. 24:59value,
  746. 25:01you need to not train them not just on
  747. 25:04publicly available data,
  748. 25:05>> [music]
  749. 25:05>> but you need to make private, privately
  750. 25:08owned data available.
  751. 25:11>> And critically, community engagement and
  752. 25:14transparency need to become
  753. 25:15foundational. It can't be an
  754. 25:17afterthought. The backlash happening
  755. 25:19right now, at its core, is a failure of
  756. 25:21trust.
  757. 25:23So, what do we make of all of this?
  758. 25:25So, I've been covering AI on this
  759. 25:26channel for over 10 years now, and
  760. 25:28despite the recent appearance in the
  761. 25:29public zeitgeist, my stance on it has
  762. 25:32always been the same. AI can be
  763. 25:34revolutionary if used correctly,
  764. 25:35simplifying maths in cutting-edge
  765. 25:37physics, recognizing patterns in data
  766. 25:39that humans might miss, making
  767. 25:41repetitive tasks easier, but it's
  768. 25:43certainly not a silver bullet in all use
  769. 25:45cases.
  770. 25:47So, if we're raising electricity prices
  771. 25:48for hardworking communities so someone
  772. 25:50on X can generate a meme by typing a few
  773. 25:52words, or other people can fill the
  774. 25:54internet with slop, well, call me crazy,
  775. 25:57but that doesn't sound like a great
  776. 25:59trade-off to me.
  777. 26:00Don't get me wrong. We've always needed
  778. 26:02data centers. Before [music] AI, they
  779. 26:04were quietly running everything from our
  780. 26:06bank accounts to our streaming services.
  781. 26:08The truth is, they're not going [music]
  782. 26:10away, and they probably shouldn't. But
  783. 26:12the question isn't whether we should
  784. 26:13build them at all. It's how. [music]
  785. 26:15And it's also a question that's a
  786. 26:16function of is the amount being built
  787. 26:18really worth the payoff? It's something
  788. 26:20to think about. So, what do you guys
  789. 26:22think?
  790. 26:23>> [music]
  791. 26:23>> What are your views on data centers? And
  792. 26:25where do you see the future of all of
  793. 26:27this going?
  794. 26:28Anyway, that's about it from me. Thanks
  795. 26:30so much for watching all the way through
  796. 26:31to the end. Really appreciate it.
  797. 26:33So, my name is Dagogo, [music] and
  798. 26:35you've been watching Cold Fusion, and
  799. 26:36I'll catch you again soon for the next
  800. 26:38episode. Cheers, guys.
  801. 26:40Have a good one.
  802. 26:42>> [music]
  803. 26:59[music]
  804. 27:06[music]
  805. 27:12>> Cold fusion.
  806. 27:13It's new thinking.

About this transcript

This page contains the full transcript of Why Building AI Data Centres Isn’t Working Anymore by ColdFusion, generated from the public captions YouTube serves with the video. The transcript has 4,804 words across 806 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, caption language selection, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.