Turning Aircraft Problems Into Engineered Solutions | Ryan Hader - Part II - Ep 119 — Transcript
Full transcript
- 0:00And in this particular instance, what
- 0:01happened was there's a can of Coke that
- 0:03flew out, rolled underneath the
- 0:04collective, and the helicopter had to do
- 0:06emergency landing all because a can of
- 0:08Coke rolled rolled underneath the flight
- 0:10controls. And that's And that's exactly
- 0:12the point I'm making, David, is is that
- 0:13these are the instances that you you
- 0:15have to consider. It was a real bulletin
- 0:17that was issued to Transport Canada.
- 0:19Another operator had installed a coffee
- 0:21cup on a on a pilot seat, and Airbus
- 0:24issued that it's not allowed. So, now
- 0:25you've got to you've got to dynamically
- 0:27test a seat, which starts at, you know,
- 0:29$60,000 plus the cost of purchasing a a
- 0:32seat, so you can dynamically test it.
- 0:35So, now you've turned a 50-cent 3D
- 0:36printed coffee cup holder into a
- 0:38$200,000 project, you know,
- 0:40congratulations.
- 0:41>> Thank you to this episode's sponsors,
- 0:43Vertical Aviation International and
- 0:46Airbus.
- 0:48Welcome to the Vertical MRO podcast,
- 0:51where we dive into the world of
- 0:52helicopter maintenance, repair, and
- 0:54overhaul.
- 0:55In each episode, we talk with the
- 0:56technicians, engineers, and experts who
- 0:59keep helicopters flying.
- 1:01Because at the end of the day, no
- 1:02maintenance, no mission.
- 1:08Welcome to part two of our conversation.
- 1:10If you missed part one, you can find it
- 1:12in our previous episode.
- 1:14>> [laughter]
- 1:14>> Yeah, yeah. And And this is this is the
- 1:16the part that gets me, right? Like
- 1:18there's so many things that we'd like to
- 1:19be able to do that,
- 1:21you know,
- 1:22look, with AC 43-13
- 1:26and some sheet metal, I could probably
- 1:28look after it.
- 1:30But then all of this
- 1:32>> Holy crap, hold on.
- 1:33>> Yeah, and again, I mean, I
- 1:35>> like a lot, and it and it seems like a
- 1:37like a To me, it seems like a
- 1:40a big I don't know. I get it. There's
- 1:41legalities. There's all the engineering
- 1:44testing. I mean, all of that stuff,
- 1:46they've got a point, for sure. How is it
- 1:49How is it going to affect all of these
- 1:51things? But then, you know,
- 1:54uh uh can't we just Can't we just get
- 1:56coffee cup holder, please? Without it
- 1:59costing $200,000.
- 2:01Right? So,
- 2:03>> I mean there are absolutely ways you can
- 2:06you can design a around that, you know,
- 2:08maybe let's not put it on the seat in
- 2:10this case. Now we're
- 2:11we're keeping our Airbuses of the world
- 2:13happy. You know, you can do we make it
- 2:16we make it of a nonflammable material?
- 2:18Sure, perfect.
- 2:20You know, you can still potentially use
- 2:22a screw to install it.
- 2:24>> [snorts]
- 2:24>> You know, put it in an area where you're
- 2:26not affecting you know, major compliance
- 2:30issues and and then
- 2:32you know, you can you can likely bring
- 2:34it into your minor category where now
- 2:38entity like us can say, "Okay, there's
- 2:40no flammability, there's no structural
- 2:42concern, there's no real pilot operator
- 2:45safety concern. It's fine. You can sign
- 2:47this off as a minor." That could happen.
- 2:49Now we've said we've looked at this. We
- 2:51still have to document it internally.
- 2:53So, we still have to create those those
- 2:54compliance
- 2:56things that we've looked at, but we
- 2:57don't have to go through the same STC
- 2:59process. I was only only touching on
- 3:01that one as because we had brought up
- 3:03the the minor and STC clarification. We
- 3:05should probably roll into a major STC
- 3:09>> [laughter]
- 3:10>> discussion because it involves the same
- 3:12same thing, but
- 3:13I was just highlighting some of those
- 3:15compliance details that you know, most
- 3:16people many people would would ask about
- 3:19and maybe not not necessarily see the
- 3:22you know, full compliance issues that
- 3:24you you can you can get into on some of
- 3:26those. Painted adhesives, I mean those
- 3:28are all similar ones that they come up
- 3:29all the time about you know, minor
- 3:32versus versus major. And then the other
- 3:34thing we have to deal with is minor
- 3:35versus major in the certification world
- 3:37also has a another meaning in minor
- 3:40versus major in in the maintenance
- 3:41world. And those are two completely
- 3:43separate
- 3:44classifications that have the same
- 3:46terminology which comes up
- 3:48with confusion uh, regularly.
- 3:51>> Yeah, I think we could sort of take the
- 3:54the conversation in in two directions
- 3:56from here, Ryan. So, I'll I'll sort of
- 3:58leave it to yourself which which makes
- 4:00the most sense in this case, but I think
- 4:03like you're saying, we can talk about
- 4:05something that is a bit more substantial
- 4:07here. I know with IAROS work previously
- 4:10and also the types of requests that you
- 4:12guys are getting, uh, and we've
- 4:14established more than a foundation to
- 4:16dig into some of these conversations and
- 4:18some real-world examples behind them.
- 4:20Um, so easy for someone to see the
- 4:22finished STC,
- 4:24uh, but where did how did you get there
- 4:26for something like the EO or IR cameras,
- 4:30medical interiors like I had mentioned
- 4:32earlier, or we could even expand this
- 4:34conversation to something that is, uh, a
- 4:36bit more involved from the perspective
- 4:38of something like lithium-ion batteries
- 4:40or uh, CVRs, cockpit voice recorder
- 4:43systems that have even more dynamics
- 4:47going on with the level of integration
- 4:50that we're talking about on the aircraft
- 4:52itself. I think we I'd like us to make
- 4:55sure that we have some time to touch on
- 4:57uh, the international aspect that you
- 5:00can have aircraft showing up in Canada
- 5:02that have equipment on them. Uh, I
- 5:04definitely want us to touch on that
- 5:05point still, but I think there's
- 5:06something to be said when we're talking
- 5:08about uh, the level of integration of
- 5:11interiors, cameras, uh, and then the
- 5:13problems or the the situations that you
- 5:15have to address for something like a an
- 5:18lithium-ion battery or a cockpit voice
- 5:19recorder.
- 5:21>> Yeah, no, all all great topics. Um,
- 5:23let's uh, maybe roll into EOIR um,
- 5:26modifications a bit cuz those are
- 5:28absolutely in interesting topics and
- 5:30quite involved from all aspects. Uh,
- 5:32certification is uh, of course.
- 5:35Um, but something like that,
- 5:37again, we do develop our own products.
- 5:40We do do have a number of our own camera
- 5:44mount systems, um,
- 5:46whether that be retractable elevators.
- 5:49We have our own arms system, we call it,
- 5:52uh, which is a retractable mount system.
- 5:55And we we we have our cantilevered
- 5:57mounts as well as a vertical, uh,
- 6:00elevator lift. Um, so those are can be
- 6:04covert operations. We do work with some,
- 6:06uh, covert military and and law
- 6:08enforcement aspects.
- 6:10Um, they do prefer to have, uh, remove
- 6:12or retractable, uh, EO/IR systems. We do
- 6:16have fixed mount systems. Um, we are
- 6:20you know, this we're working on an
- 6:21aircraft right now where we are doing a,
- 6:23um,
- 6:24emission system on a King Air. It is a,
- 6:27uh, heavily involved, um,
- 6:28you know, full cabinet interior modded,
- 6:31um, elevator system, radar systems
- 6:33mounted on the belly with a large, uh,
- 6:36pod radar pod on the mounted on the
- 6:38belly, a number of antennas mounted, uh,
- 6:42around the aircraft. Um, and that is a
- 6:44highly involved program from
- 6:48installation aspects, certification,
- 6:50design, from a flight test perspective,
- 6:52you know, we're looking at buffeting,
- 6:54we're looking at performance.
- 6:56Um, you know, from a design perspective,
- 6:59obviously, we're looking at, uh,
- 7:00strength and structures. On the cabinet
- 7:02interior side, you know, full
- 7:04[clears throat] cabin, uh, operator
- 7:05systems, um, display systems, radios,
- 7:08and something like that. You know, we
- 7:10largely have a number of our own
- 7:12products that the customer approaches us
- 7:15and says, "Hey, we need to, uh, you
- 7:16know, again, get to this end and goal
- 7:19here." Starting starting with this, you
- 7:21know, aircraft that has nothing on it.
- 7:23Um, we have an aircraft, uh, or we are
- 7:26getting our aircraft delivered from
- 7:27Textron, and we need you to work with
- 7:30Textron and figure out, you know, how to
- 7:32get to this this this end goal over
- 7:34here.
- 7:35All of all of those scenarios happen.
- 7:37This one happened to be a Textron
- 7:38delivered aircraft, and we are working
- 7:40with Textron to bring the aircraft to
- 7:42what the where the customer wants it and
- 7:44and Textron is giving us basically the
- 7:46base shell and we are there now where
- 7:48the aircraft is fully populated and and
- 7:51we are into our testing phase.
- 7:54>> Wow.
- 7:54>> Yeah, and in order to get there, I mean
- 7:56we are going through design. So, we're
- 7:57going through you know basic straight
- 7:59rate from placements of where we're
- 8:00going to put stuff. You know, so that
- 8:02involves you know going down to see the
- 8:03aircraft, going doing completing a site
- 8:06survey, you know, removing panels,
- 8:08looking for wiring, looking for spaces,
- 8:10working with Textron, going through
- 8:12drawings, and then coming up with the
- 8:14structural aspects that each specific
- 8:16location needs to sustain.
- 8:19Um you know, on the external side of
- 8:21side of things is much different from
- 8:22the internal cabin side of things where
- 8:24you need to maintain, you know, a heavy
- 8:26crash loading whereas the external side
- 8:28is a little different. Um you have your
- 8:30your aerodynamic loads are are more of a
- 8:32concern than your your crash loading
- 8:35aspects whereas in the cabin, you don't
- 8:37have those aerodynamic loads, you've got
- 8:38the crash loading aspects. So, all those
- 8:40are parameters that we have to we have
- 8:41to go through.
- 8:42Um
- 8:43again, it starts with design and
- 8:44location and then it gets to what
- 8:46structure we're using, you know, how's
- 8:47it being installed, what hardware. And
- 8:50then you you know, within that, you need
- 8:52to you need to keep in mind your your
- 8:54electrical parameters. You know, what
- 8:55are we into what equipment are we close
- 8:57to? Is this an electrical item? Is it
- 8:59EMI interference? What shielding do we
- 9:01need to need to have? What what um
- 9:03separation distances do do we need? You
- 9:06know, what's on antennas I'm thinking,
- 9:08you know, they need to be mounted on a
- 9:10flat surface. Can they be mounted on,
- 9:12you know, the curvature? No, oh crap.
- 9:15Okay, now we need to look at where where
- 9:16those need to be moved to. All of this
- 9:18comes into place. You know, is
- 9:20is the structure there to support it?
- 9:22No, okay, well now we need to add
- 9:24structure there. And then once
- 9:25everything's built up and and and
- 9:27finished, um then we get into the
- 9:29testing phase. Now you've got your your
- 9:32electrical functional test, you have
- 9:34electrical EMI testing at a minimum. Um
- 9:37and then if you got external devices, um
- 9:39well now you've got potential
- 9:41performance aspects you need to look at
- 9:43for flight testing.
- 9:45Um so you're going to do a flight test.
- 9:46Now you're going to do a you know, a
- 9:48basic flight test to confirm performance
- 9:51parameters, any any alterations you
- 9:53might want to make. You may end up
- 9:55reducing your
- 9:57your VNE speed. Taking a hit on your VNE
- 10:00speed is quite common, especially in in
- 10:02large
- 10:04exterior modifications. Um or you're
- 10:06going to reduce both or
- 10:08multiple, your VNE speed, cruise speed,
- 10:11maneuvering speed, and and you're going
- 10:13to confirm all of those design
- 10:14parameters, flight speed parameters, and
- 10:16you're going to include any resolution
- 10:18or limitations in
- 10:20in a
- 10:21flight supplement, flight manual
- 10:23supplement.
- 10:24Um that is that the operator is then
- 10:25going to fly to.
- 10:27>> Holly, is there
- 10:28a practical sort of piece that would be
- 10:31helpful from an understanding
- 10:33perspective? I'm thinking also for
- 10:35the early maintainer that's trying to
- 10:37wrap their head around STC, and what do
- 10:41they need to know going into the field
- 10:44or what context, right? Ryan has
- 10:46provided such a a foundation
- 10:48understanding here for STC. When you're
- 10:51looking at it from the lens on on the
- 10:53ground as a maintainer or trying to help
- 10:55the younger maintainer understand this
- 10:57STC process, what what would you have
- 11:00them keep in mind?
- 11:03>> Um for the early maintainer or early
- 11:07STC operator?
- 11:09>> Yeah, I would say yeah, the early
- 11:10maintainer would would be something that
- 11:13I'm I'm intrigued with. We have a lot of
- 11:15students that will be at Kelowna, so
- 11:17you'll get an opportunity, Ryan, you're
- 11:18joining us out in in Kelowna exciting
- 11:21for the MRO conference. There there's
- 11:24going to be an opportunity there for
- 11:26these
- 11:28these young maintainers to dig that a
- 11:30bit deeper, a better understanding of
- 11:32STC and the practical real world side of
- 11:34it besides just the theory that they're
- 11:37that they're being being taught in in
- 11:39the class.
- 11:43>> Thanks to our sponsor Airbus. Airbus
- 11:46provides the most efficient helicopter
- 11:48solutions to its customers who serve,
- 11:50protect, save lives, and safely carry
- 11:53passengers in demanding environments.
- 11:55Its civil and military helicopters are
- 11:57flying all over the world making
- 11:59missions possible. Visit airbus.com for
- 12:02more information.
- 12:05>> Perhaps.
- 12:06>> Sure. I mean, we've touched on cost a
- 12:09little bit and and
- 12:10um the one thing that
- 12:13and the costs are are I would say having
- 12:15a bit of an impact on our general
- 12:17aviation industry
- 12:19um and and that your your basic GA
- 12:22aircraft owner for 23, you know, Cessna
- 12:25172s of the world, you're not going to
- 12:27spend $200,000 on putting in a a coffee
- 12:30cup holder. You know, I don't think
- 12:32anyone would, but um
- 12:33you see the point. You know, but it it
- 12:35it it it's kind of affecting that
- 12:37industry I would say almost negatively
- 12:40um because
- 12:42the reality is is that um just because
- 12:45it's a general aviation aircraft
- 12:47uh does not mean that your your STC um
- 12:50process is any different. It isn't,
- 12:52unfortunately. Some of the FAR 23
- 12:55requirements are a little lighter.
- 12:57They're not as heavy of an aircraft,
- 12:58you're not flying as fast, and generally
- 13:00not flying as high.
- 13:02Um there So, there are some you know,
- 13:06differences that do do make the process
- 13:08a little lighter
- 13:10um not necessarily simpler, but lighter
- 13:12um and and potentially not as much work,
- 13:13so it does reduce the costs a little bit
- 13:16on some of your your GA items. However,
- 13:19um the process is again is still the
- 13:21same, but your first step would be to
- 13:23basically work with an entity like
- 13:24ourselves. What is it you need to do?
- 13:27What is it that is in STC um mandatory
- 13:30compliance? What is potentially
- 13:33a minor or AC 4313
- 13:36applicable? And really have an
- 13:39understanding of what those differences
- 13:42are and and and I mean ultimately, you
- 13:45know, work with somebody. It's like
- 13:47finding a good car mechanic.
- 13:49>> [laughter]
- 13:50>> Yeah, that's tough to do.
- 13:52>> That's tough to do these days. Tougher
- 13:54and tougher.
- 13:55>> Yeah, and I think
- 13:57we're also interested in maybe figuring
- 14:01out a little bit of what do you put into
- 14:03this in the STC in terms of continuing
- 14:08maintenance? Like how do you come up
- 14:10with your
- 14:12maintenance schedule? What what factors
- 14:14are involved in coming up with well,
- 14:17maybe we need it needs a 25-hour
- 14:21check of whatever. What
- 14:24how does that that wrap into the final
- 14:27STC? How do you how do you go about
- 14:31providing continuing airworthiness
- 14:34parameters that I get to deal with on my
- 14:37end of things or the young guys in the
- 14:39on the maintaining side get to deal with
- 14:40and you know, not necessarily a general
- 14:42aviation
- 14:44standpoint, but all of it. Like you
- 14:47could have a guy fresh out of maintain
- 14:48like AME school that
- 14:51goes and works on one of your machines
- 14:53that's got a EOL system on it and all of
- 14:56that. What should they be understanding
- 15:00about the ongoing maintenance?
- 15:03>> It's a good point from
- 15:05and to clarify, I guess with any STC
- 15:08package, you you you will be or really
- 15:12should be receiving, you know, your
- 15:13installation instructions or drawing
- 15:16parameters.
- 15:18And FMS for operations which is really,
- 15:22you know, pilot operations, anything
- 15:23that the pilot needs to be be aware of.
- 15:26Um and then your your maintenance
- 15:27aspect, so your continued airworthiness.
- 15:30So you're you're going to get an ICA uh
- 15:32documentation
- 15:33um that is going to outline continued
- 15:36airworthiness and maintenance aspects.
- 15:38So your scheduled maintenance, any
- 15:41airworthiness or any limitations for
- 15:44inspection uh parameters, whether it be
- 15:46um you know, eddy current inspections,
- 15:49um LPI, NDT style inspections, what your
- 15:53your schedule time frame is going to be
- 15:55for it. Can be every 250 hours, every
- 15:58600 hours, annually, you know, so on and
- 16:01so on.
- 16:01>> Yeah.
- 16:02>> Um so all those parameters um will be
- 16:05provided. Um
- 16:06and if they are not, I mean, you you you
- 16:08absolutely need to be need to have them.
- 16:11Um and you have a right to to ask for
- 16:14them to any um certification entity. So
- 16:17if it's somebody like us that's uh
- 16:19provided that and you don't have them,
- 16:21uh and the aircraft was purchased and it
- 16:24was um included on that that aircraft.
- 16:27This come This happens from time to
- 16:28time, obviously. Somebody will purchase
- 16:29an aircraft, they've got an existing STC
- 16:31on it. The new uh owner no longer has
- 16:34the original documentation. They they
- 16:36should be reaching out to make sure that
- 16:38they have the updated um STC
- 16:40documentation uh for all those reasons
- 16:43you're you're you're highlighting,
- 16:44Howie.
- 16:44>> And and how often do you find like So
- 16:47from uh STC creation, you guys do all
- 16:52the fancy math and computer simulations
- 16:56and all that to come up with, you know,
- 16:58this is all the
- 16:59>> Those are the ones we're going to see.
- 17:00>> Yeah, yeah, yeah. So and darts, right?
- 17:02Oh, that's a uh we'll look at that every
- 17:0520 hours. Nice.
- 17:07So from your point of view, uh
- 17:10an STC gets uh created,
- 17:13you do all the the fancy math and
- 17:15computer work to determine uh
- 17:18and and actual, you know, physical
- 17:20testing, smashing that
- 17:22>> [clears throat and cough]
- 17:22>> $20,000 seat for a
- 17:25$10 coffee cup holder.
- 17:27We do all of that to determine that this
- 17:28is okay to go, and this is the
- 17:30inspection inspection schedule that we
- 17:33are going to follow.
- 17:3410 years down the road, how are we
- 17:36doing? Do you get uh do you ever get
- 17:38feedback like, "Ah, maybe we want to
- 17:40look at that more often." Or, "Hey, hey,
- 17:43that was doing really well. Let's bump
- 17:45that out."
- 17:46>> Um another good question, Howie. You're
- 17:48you're all over this. I like it.
- 17:50>> [laughter and clears throat]
- 17:51>> This is why we bring him on, right?
- 17:55>> Um yeah, good question. And it does
- 17:58happen that we do get feedback. We
- 18:00obviously have a number of our products
- 18:02that have been out there for 10, 15
- 18:04years now,
- 18:05and do have a number of flight hours
- 18:08excuse me, on them
- 18:10or on the product or on the you know,
- 18:12installed cabin cabin system. For the
- 18:14most part, I would say that
- 18:17we're we're going to be pretty good at
- 18:20seeing seeing into the future. I always
- 18:22tell people I've got a crystal ball.
- 18:24Um but with with the math
- 18:26>> more than
- 18:27>> Yeah, exactly. That we
- 18:29we put into place. It is generally, you
- 18:32know, it is intended to maintain that
- 18:35for 10 years, obviously. Right? That's
- 18:37the intent. You know, are there
- 18:39improvements that can be made over time?
- 18:42Well, absolutely. So, one of the things
- 18:44that that we we do, especially with the
- 18:46customers that we work with quite
- 18:47frequently, is we make sure that we are
- 18:49getting feedback. You know, what are you
- 18:51know, no
- 18:52one of the things the customers always
- 18:53tell me is or operators tell us is no no
- 18:56no news is good news. But, I always like
- 18:59to try to you know, we work with a
- 19:00number of heavy medical operators and
- 19:03law enforcement, and we keep in good
- 19:04contact with them. And
- 19:06regularly reach out to them, and you
- 19:07know, how is this working? You know,
- 19:09your iPad holders, we got some
- 19:10retractable iPad holders. You push a
- 19:12button, it does
- 19:13some fancy movements, comes out and
- 19:15says, "Hey, here I am." You know, so but
- 19:17you've got movable components. You've
- 19:19got shock mounts in there for isolating
- 19:21vibration,
- 19:23especially in heavy rotor frames. You
- 19:25know, so you got parts that are going to
- 19:26wear. You know, is it what we expected?
- 19:28Most of the time it it's it's it is. You
- 19:31know, are there other things? Yes, there
- 19:33can be. Are those things that we we
- 19:35potentially saw as as items down the
- 19:37road? Most of the time again,
- 19:39absolutely. Um in some cases, yes,
- 19:42[clears throat] there's going to be
- 19:42items that okay, well,
- 19:44this is going to need to be replaced.
- 19:46Let's increase material or or change
- 19:48material on that for lower wear, lower
- 19:50friction. You know,
- 19:52you know, let's change the inspection
- 19:54schedule to include to look at this
- 19:55piece of hardware or this piece of
- 19:57slider or add some grease here. Those
- 19:59sorts of evolution of a maintenance
- 20:03program
- 20:04should absolutely happen, I would say.
- 20:08And it's not because any any company
- 20:10necessarily didn't didn't see it from
- 20:12the beginning. Obviously, that happens
- 20:13from time to time. You'll open up the
- 20:15>> The real real life has a way of being
- 20:18slightly weirder than we predict, right?
- 20:23>> I absolutely. And I mean, every now and
- 20:24then you'll open up a maintenance manual
- 20:26or an ICA and and say, "How were they
- 20:28thinking? You know, check this? It's
- 20:30There's a million other things to do
- 20:31this thing."
- 20:32You know, and obviously
- 20:34>> Every
- 20:35>> [laughter]
- 20:36>> Nine out of 10 times maybe, yeah.
- 20:38>> Yeah, that sounds about
- 20:39>> Um so, one thing
- 20:42that I try to really encourage here is
- 20:45that we we don't be that nine out of 10
- 20:48times and that and that you're going to
- 20:50go over and above and in the maintenance
- 20:52manual should be, you know, think of all
- 20:54of the things that can't happen cuz
- 20:56somebody it will happen.
- 20:57>> Hell, yeah.
- 20:58>> Yeah, and so we do that quite quite
- 21:00often, quite a lot. And we do work with
- 21:02again some very public operators and and
- 21:05the maintenance schedules. You need to
- 21:07be thinking of all the things that uh
- 21:10don't do that, you know, but put that in
- 21:12there because they're going to do that,
- 21:13you know, don't stick your finger in the
- 21:15outlet because it's going to happen.
- 21:21>> [laughter]
- 21:28>> Most operators are not, you know,
- 21:29sticking forks into electrical sockets
- 21:31and you don't need to make them aware of
- 21:33that, but you need to make the part or
- 21:36the product operation as functional as
- 21:38possible and as maintenance maintenance
- 21:40friendly. You need to be thinking about
- 21:4210 years down the road. What is what is
- 21:44what is going to be happening and that
- 21:46that that does need to go into the
- 21:47maintenance program. It is a living
- 21:50document to degree absolutely.
- 21:52>> Yeah, nice. Fork into an electrical
- 21:55outlet. I didn't remember telling you
- 21:56that story of my childhood. Yeah.
- 21:59>> [laughter]
- 21:59>> Well, I'm about the same same generation
- 22:02I think so I did it too, Howie.
- 22:04>> [laughter]
- 22:05>> What's your
- 22:07what's your spread
- 22:09aircrafts
- 22:11new generation that stuff that you're
- 22:13you know, is is new aircraft new Airbus
- 22:16stuff that's coming out that you're
- 22:17doing brand new
- 22:19medical interiors for
- 22:22versus hey, I've got this 30-year-old
- 22:26machine that now needs to perform a new
- 22:30job that it wasn't originally sort of
- 22:32designed they didn't even know about
- 22:34back in the day and now we want to do a
- 22:36thing. Do you do you get a lot of
- 22:38widespread
- 22:40new versus old
- 22:42machines to work on?
- 22:46>> Verticon, it's the event of the year and
- 22:49it's coming up. This year we're looking
- 22:51at 600 companies, 15,000 attendees and
- 22:54cutting edge of vertical aviation
- 22:56technology all under one single roof.
- 22:59I'm being told that there's going to be
- 23:00some new [music] exciting things on the
- 23:02show floor. So, you're not going to want
- 23:04to miss it. And it's all happening at my
- 23:06favorite spot, Anaheim. Great
- 23:08restaurants. It's honestly one of my
- 23:10favorite expo spots. You should be
- 23:12joining us for the world's largest
- 23:14vertical aviation trade show and
- 23:16conference, Verticon, powered by VAI.
- 23:19Register now at verticon.org.
- 23:23>> Oh, yes, 1,000%. I mean,
- 23:26we are certified for every category, not
- 23:30uh so for 23, 25, 27, 29. So, normal
- 23:34category helicopters, heavy category,
- 23:36rotary.
- 23:38Same for fixed-wing.
- 23:39Um so, GA aircraft and, you know,
- 23:42commercial heavy heavy aircraft. And
- 23:44then, that spectrum is is is quite quite
- 23:47wide. I mean, so I mean, you touched on
- 23:49a little bit, David. I mean, we'll do
- 23:50everything from, you know, CVR, CVFDR
- 23:54installations, with rips, with
- 23:57you know, lithium-ion battery
- 23:58installations, to full EOR camera under
- 24:02tractable sensor installations with a
- 24:04full operator system. And we'll work on
- 24:07412s. We work on a lot of 412s, you
- 24:09know. We help with the the firefighting
- 24:12programs quite a bit. We work on, you
- 24:14know, 206s, Bell 206s, uh just Cessna
- 24:17206s,
- 24:18you [laughter] know.
- 24:19Um 747s, 777s. It's
- 24:22uh it is a a wide uh range and a mix of
- 24:25items. Again, our niche a little bit is
- 24:29the um the mission category or essential
- 24:32service systems. Then again, you're you
- 24:35know, your medical operators, law
- 24:37enforcement, military. So, we we deal a
- 24:39lot with a lot of those aircraft. Those
- 24:42are your King Airs, uh Cessna Caravans,
- 24:45to your Twin Otters, to um
- 24:47Leonardo helicopters, to Airbus
- 24:49helicopters, to your Bells, Sikorskys,
- 24:53um
- 24:54probably miss
- 24:55>> So, what would you say, Ryan?
- 24:57Yeah, so would you say
- 24:59further to Holly's point then, with that
- 25:01wide spectrum, you are genuinely still
- 25:04seeing older airframes coming in that
- 25:06are in those those categories that are
- 25:09are requiring the work. It's not just
- 25:11stuff that's coming off of Textron's
- 25:13line that is is meeting this work.
- 25:15Clearly, the a Bell airframe, to how he
- 25:18can attest to, is still out there
- 25:21slogging in the bush doing the work, and
- 25:23next thing you know, there's the next
- 25:25piece of
- 25:26technology that can be applied to it,
- 25:27right? So.
- 25:29>> Absolutely. I mean, one of the things
- 25:30that we've done with the 412 itself is
- 25:32that we've brought it out of the, you
- 25:33know, legacy era. We have a full glass
- 25:36cockpit upgrade for the 412 and
- 25:39autopilot upgrade with nice
- 25:42displays, PFD displays, primary displays
- 25:45in in the cockpit,
- 25:47which we've done for a number of the
- 25:48412s across across Canada. I think it's
- 25:52a few in stateside as well.
- 25:54And we we do see a lot of that,
- 25:56especially with helicopters, with
- 25:58helicopters being a little bit more
- 26:00maintenance heavy maybe cost-wise, that
- 26:03we do see, you know, especially the low
- 26:05hour rotary airframes get brought in,
- 26:08and they'll they'll strip them down and
- 26:10and do a whole upgrade, bring it out of
- 26:12the legacy era into into today's
- 26:15technology, and and it's that that's
- 26:17quite common. We do work again work a
- 26:19lot with the stuff that comes off the
- 26:21line, you know, whether it's Airbus or
- 26:22Leonardo,
- 26:24or your fixed wing applications as well.
- 26:28All of all of the above, yeah.
- 26:30>> I'll be interested Howie in this
- 26:32section, any real-world experiences or
- 26:35airframes that you've had to touch in
- 26:37this capacity where it's an
- 26:39international question. We had alluded
- 26:41to it earlier. Not every airframe, Bell
- 26:44airframe, or Airbus airframe
- 26:47that suddenly makes its way over to
- 26:49Canada or into the States, has been
- 26:52there the entire time. And as a function
- 26:54of that, if I'm an operator buying that
- 26:56helicopter from another country, it may
- 26:58or may not already have equipment or
- 27:00modifications installed on it. And
- 27:02everything may be perfectly at legal
- 27:04where that aircraft was operating, but
- 27:06what do I
- 27:08as whether be the maintainer that's
- 27:09assisting that owner or the owner
- 27:12themselves, what do I need to be looking
- 27:14before bringing that aircraft home?
- 27:16We do not want to be caught out with it
- 27:18sitting here in Canada and now trying to
- 27:21figure that all out. So, what can happen
- 27:23if we discover some of those
- 27:24modifications or approvals ahead of time
- 27:27and how can we sort of navigate that
- 27:30process or or what experience have you
- 27:32had Ryan or or Howie in any of these
- 27:34processes in the past?
- 27:37>> Many, many experiences.
- 27:41>> Well, happy to hear them. Happy to share
- 27:43them. Don't have to name names, but
- 27:45yeah, it's I'm sure it's not a
- 27:48it's not a limited or it's not a rare
- 27:50thing to have happened within aviation.
- 27:52These airframes have a habit of of
- 27:54moving around and across borders and
- 27:56change registrations quite often.
- 27:59>> Mhm.
- 28:00It's a it's a common thing. Feel free to
- 28:03jump in and out anything as I go here
- 28:04Howie, both of you. But um
- 28:07um I'll start with the importing into
- 28:09Canada.
- 28:11Um so, that is one that obviously comes
- 28:13up quite quite a bit and
- 28:16um
- 28:17every time that we get involved,
- 28:19obviously it's because there's an issue.
- 28:21Um so, the main thing is is you you need
- 28:25to do your due diligence and you need to
- 28:27fully understand anything that's that's
- 28:30been applied to to that aircraft,
- 28:34whether they consider it a and then what
- 28:37digress a little bit. Um we do have a
- 28:39bilateral with the FAA, which is
- 28:42intended to make things easier. Does it
- 28:45always? No. Can it be ignored?
- 28:47Absolutely. Can Transport deny
- 28:50acceptance of the bilateral? Of course
- 28:52they can.
- 28:53And likewise for for FAA and other
- 28:55regulatory bodies.
- 28:57So one that happens quite commonly
- 28:59with coming from the FAA is that the FAA
- 29:03has
- 29:04what is known as the field approval,
- 29:07which
- 29:08we we in Canada do not have. We do have
- 29:12our minor approval, but is not is not
- 29:15identical to
- 29:17the the FAA field approval and the FAA
- 29:20field approval is not accepted under
- 29:23Transport Canada.
- 29:24So if you go and buy a an aircraft that
- 29:28has field approval on it, let's say it's
- 29:31got 20 field approvals and this has
- 29:32recently happened. I think actually it
- 29:34was 42 field approvals.
- 29:37Transport Canada and you buy the
- 29:39aircraft, you get a permit to fly to
- 29:40Canada, you'll fly to Canada and
- 29:43Transport Canada will say great. It's
- 29:45not moving for a very long time. And
- 29:47then they will force you to go through
- 29:49every single one of those field
- 29:51approvals and confirm or deny whether
- 29:54it's acceptable or not. And then
- 29:55Transport Canada has the the ability or
- 29:58authority to say that we don't agree
- 30:01with you know half those field
- 30:02approvals, we're not going to accept
- 30:03them at face value. You are going to
- 30:06have to now either A, your cheapest is
- 30:09probably remove those those
- 30:11modifications or B, you know, obtain
- 30:14STCs for those modifications.
- 30:17And so many many cases what happens is
- 30:19that exact scenario. I get contact
- 30:21contacted,
- 30:23the customer says it you know, we don't
- 30:24know what to do. I'll explain to them
- 30:27exactly what we just discussed here.
- 30:29They'll come back and say okay, out of
- 30:31the list that we have
- 30:33we're going to remove these these five
- 30:34just to make it easier. Okay, well now
- 30:36we're down to 15 that need to be
- 30:38processed as STCs. And then we'll go
- 30:40through the STC process for for every
- 30:42single one of them
- 30:44unfortunately.
- 30:45>> No, I was going to say I mean I know it
- 30:47really depends on on
- 30:50what it actually is, but
- 30:53what's what's your
- 30:55record time for fast and slow
- 30:59for ever having done that on machines?
- 31:02Like I can imagine that that is a long
- 31:04process. You buy a machine, it comes in,
- 31:07oh crap, we got to do STCs for all this
- 31:09stuff. Like is this months, years? What
- 31:12what's your typical workflow there?
- 31:16>> I mean it's typically, you know, several
- 31:19months, two to three months I would say
- 31:20depending on what it is.
- 31:22Um it is it is frustrating
- 31:26for me
- 31:29more so obviously for the operators that
- 31:31purchased the aircraft. And and you
- 31:34know, I say quite often rolls
- 31:36downhill and we're at the bottom.
- 31:38It is it is problematic because then you
- 31:41end up with an installation that you
- 31:42don't necessarily have the full details
- 31:44on. You don't have the full information
- 31:46on it. So how can you justify compliance
- 31:49to that modification without it? Well,
- 31:51you can't. That's that's, you know,
- 31:54an oxymoron statement. You can't do
- 31:56that. So now you need to create that
- 31:57data and if that creating that data
- 32:00means that you need to remove that
- 32:01modification and reinstall it just to
- 32:03some degree, well, then that's that's
- 32:05that's the process. How long does it
- 32:08take you to basically recreate that STC?
- 32:12It obviously is going to vary with the
- 32:13complexity of the modification. We did
- 32:16one recently where they had replaced the
- 32:19main aircraft battery. It was a valid
- 32:22aircraft battery, but there was no
- 32:24documentation on how it had been done.
- 32:25It was not done via an STC. It was done
- 32:28via field approval. How they managed to
- 32:30get that done as a field approval should
- 32:32not have been done. That was a misuse of
- 32:33the field approval form or mis
- 32:36uh approval process in the states and
- 32:39that is one of the the biggest problems
- 32:41with some of those
- 32:43vehicles is that those those vehicles do
- 32:46get abused. Um and that's one of the
- 32:48biggest problems with field approvals is
- 32:51when they come into Canada. Maybe you
- 32:53can I've seen full aircraft mods with
- 32:56EOIR sensors called a field approval.
- 32:59You know,
- 33:00it's happened. Um you know, the FAA is
- 33:03aware of those instances or many of
- 33:05those instances. It is trying to stop
- 33:06them and that field approval process is
- 33:09really changing and it is really going
- 33:10to go away um
- 33:12to some degree at some point. And the
- 33:14whole reason that it existed, I'm
- 33:15digressing a little bit, sorry if David
- 33:17>> Talk about
- 33:17>> um is is to assist with a literal field
- 33:20repairs where somebody cannot get back
- 33:22to a hangar to do a proper repair or
- 33:25modification.
- 33:26>> Right.
- 33:26>> Well, that obviously rolled into a
- 33:28misuse of what that is for and that is
- 33:30why
- 33:31it can become um a bit of an issue.
- 33:34And it's similar going the other way. Um
- 33:37Any questions on that?
- 33:39>> No, I don't think so. I mean that's
- 33:41>> comments there?
- 33:42>> That's sort of what I figured.
- 33:43>> Yeah, and it's the same with uh I mean
- 33:45EASA tends to be a little bit
- 33:47um
- 33:48better for lack of better word is that
- 33:51you don't seem to see as much of uh use
- 33:54misuse of
- 33:55uh some of the um certification. They're
- 33:58a little bit more stricter on their
- 33:59enforcement of how things are done.
- 34:00>> going to say that's probably because
- 34:02they're a bit more strict on
- 34:04>> They apply things. Yeah, uh CASA is a
- 34:08big is a big problem. We don't have a
- 34:10bilateral with Australia with CASA in
- 34:11Australia. Um the CASA certification
- 34:15regulatory body is a little more lax. Um
- 34:18there is a bilateral with the FAA to
- 34:20CASA, but it does cause some issues in
- 34:22that people will go and purchase an
- 34:24aircraft come from CASA assuming that
- 34:26the bilateral to the FAA allows them
- 34:28with the bilateral in Canada. It it does
- 34:30not most of the time and many times
- 34:33those aircraft get grounded for 12 12
- 34:35months or more before something gets
- 34:37sorted out and then we generally need to
- 34:39get involved and then we're dealing with
- 34:41the customer that's pissed from the
- 34:42get-go because their aircraft's
- 34:45grounded, they've just spent millions of
- 34:46dollars in buying an aircraft now they
- 34:48found out they need to spend more money
- 34:50to meet the compliance that was never
- 34:52done or demob the aircraft or both. So
- 34:55>> Yeah.
- 34:56>> They they got the old yeah, nah, it'll
- 34:58be all right.
- 34:59>> Yeah, exactly.
- 35:01>> [laughter]
- 35:01>> Yeah, that was good Howie.
- 35:04>> I worked down there and I was just Dave,
- 35:06hey Dave, hi Dave, how's it going mate?
- 35:09>> [laughter]
- 35:11>> I worked with Aussie for most of the
- 35:13year over in Algeria.
- 35:15>> Oh wow.
- 35:15>> his accent quite accurately. [laughter]
- 35:20There we go. You were taking up all
- 35:22sorts of time.
- 35:23>> There's I mean
- 35:25I I you say that and it comes as
- 35:29no major surprise.
- 35:34>> If you're passionate about rotorcraft
- 35:35maintenance, then [music] be sure to
- 35:36check out Vertical's new Instagram
- 35:37channel at vertical.mro.
- 35:40Sharing all things related to helicopter
- 35:42maintenance, repair and overhaul.
- 35:44From the latest podcast episodes to
- 35:45conference updates and even epic
- 35:47photography, Vertical MRO's dedicated to
- 35:49supporting and advancing rotorcraft
- 35:50maintenance, the backbone of our
- 35:52industry.
- 35:55>> Yeah, and then it's sort of like going
- 35:56the other way. I mean we we do have our
- 35:58our minor
- 36:00um certification release and and that
- 36:02has been flagged
- 36:04importing aircraft from Canada into the
- 36:06US.
- 36:08We've had, you know, both questions and
- 36:10somebody's applied a minor certification
- 36:13to an aircraft repair or mod and it
- 36:17hasn't been ours and they've called us
- 36:18and said the FAA is not accepting it,
- 36:20you know, they need more documentation
- 36:22and and we can go through hopefully go
- 36:24through and provide the documentation
- 36:26even if it's not our minor. Uh in some
- 36:29cases, if it is not our work, then we
- 36:32would need to potentially recreate some
- 36:34of that data that FA the FA is
- 36:36requesting. In another instances
- 36:38instance, it was our work and uh they
- 36:42were they were not sure about the
- 36:44process or the vehicle that had
- 36:45certified it. And then, you know, but
- 36:47once they basically reached out to us
- 36:49and and spoke with us directly and we
- 36:51provided them all the documentation
- 36:53through our bilateral our minor um
- 36:56certification is acceptable to the FAA
- 37:00and they can accept it. And so
- 37:01>> Right.
- 37:01>> in those instances, they did accept it
- 37:04um that way. I'm just comparing that to
- 37:06basically the field approval process
- 37:08going going the other way.
- 37:09Um so those those instances both both um
- 37:13obviously happened quite frequently. Uh
- 37:15in many cases, not if not in many cases,
- 37:18in some cases, uh Transport Canada will
- 37:21uh reject the the uh the mod. And
- 37:24another I guess I guess a a third one
- 37:25that should we should mention is it
- 37:27actual STCs. It can be STCed on an
- 37:30aircraft and not accepted by your
- 37:32importing and end country. So, quite
- 37:35commonly, obviously, if you have an FA
- 37:37STC that is not validated in Canada, we
- 37:40do not have to accept it. Uh Transport
- 37:42Canada does not have to accept it and
- 37:44they will hold that line. Um and we have
- 37:47we do come into that regularly as well,
- 37:49even if it's a a factory STC from
- 37:51Cessna. Um Transport Canada has denied
- 37:55them. And we we went through one
- 37:57recently where
- 37:58they denied us a factory mod because uh
- 38:01it was an STC, it was not validated in
- 38:03Canada. Um you know, and in this
- 38:06instance, uh maybe I'll I'll um digress
- 38:09a little bit. We went through it and and
- 38:10Transport Canada was right and and the
- 38:13modification did not meet the compliance
- 38:15requirements that uh were happened to be
- 38:18both Transport Canada and FAA.
- 38:20>> Oh, I
- 38:21>> for a while.
- 38:22>> It had an FAA uh STC to it and so we we
- 38:25had to redo the modification and add
- 38:28structural support to this modification
- 38:30in order to import the aircraft into
- 38:33Canada. And the customer was
- 38:35very happy.
- 38:36>> And so when you're when you're on the
- 38:39back on the other side of it, when
- 38:40you're creating an STC, do you find
- 38:43yourself building and or making
- 38:46application in Canada only or do you do
- 38:49like a global sort of application for
- 38:52all of it?
- 38:53>> Um you're you're referring to if we want
- 38:56to obtain like both Canadian and FAA STC
- 38:59paperwork?
- 38:59>> Well, yeah, like I got I'm I guess the
- 39:03answer is probably in
- 39:05the customer and where they anticipate
- 39:07operating. But for something, let's say
- 39:10you've you've designed the STC for this
- 39:12customer, they're working in the United
- 39:13States, obviously you're going to get an
- 39:15STC done for the FAA. You're probably
- 39:19going to do one for Canada as well. Do
- 39:22you do another one for EASA or is that
- 39:25all you leave that until somebody
- 39:27actually wants it because there's cost
- 39:28involved and all of that or is there any
- 39:30time when it's seen as worthwhile to
- 39:33just get it like I don't know if there's
- 39:35a blanket coverage globally sort of
- 39:38thing.
- 39:39>> Uh there's no blanket coverage. Um a
- 39:41little bit of mix of all of the above,
- 39:43Howie. If if we if we have the foresight
- 39:46that we know it's going to be utilized
- 39:48in in EASA territory for instance, we
- 39:51may may push for that if it's a European
- 39:54helicopter for instance, which has
- 39:55happened. Leonardo for for instance, you
- 39:58know, we'll we'll we'll obviously expect
- 40:00to process the EASA STCs maybe sooner
- 40:02than later.
- 40:04But most of the time I would say that
- 40:06you know, we're going to start with we
- 40:07have to start with the Canadian STC and
- 40:10we may have the foresight to want to
- 40:12validate it uh within the FAA
- 40:15right away. In some cases,
- 40:18we'll do that in some cases we'll wait
- 40:20until you know we have a request to do
- 40:22so.
- 40:23>> Wow, Ryan. This has been a great
- 40:26conversation. We have covered a lot of
- 40:28ground when it comes to STC and the
- 40:32processes and the the work that IARO is
- 40:35doing. I almost think without intending
- 40:38to
- 40:39we've put together a pretty good STC 101
- 40:42with with this podcast. For anyone
- 40:44listening who might find themselves
- 40:46dealing with one of these situations,
- 40:47this hopefully can be a good resource.
- 40:50And before before we wrap
- 40:52and
- 40:53and leave the recording if there is
- 40:55there anything that we haven't touched
- 40:56on today or that you wish more owners or
- 40:59maintainers understood before they got
- 41:00into that STC process, Ryan, or what you
- 41:03would like to leave our listeners with?
- 41:05>> Yeah, the one the one thing that I I do
- 41:07tell everyone is is contact us.
- 41:10>> [laughter]
- 41:11>> And I say that to a little bit tongue in
- 41:14cheek, but
- 41:16seriously,
- 41:17I mean I love the industry, I love
- 41:19aircraft, I love what we do. Everybody
- 41:21here I would say is is the same way and
- 41:24most many operators get into a situation
- 41:27because they did not contact their
- 41:31certification buddies.
- 41:34Part partners, you know, and they should
- 41:38be because they a lot of them will rely
- 41:41on what the sales people tell them.
- 41:43And um
- 41:45not to speak of sales people, but they
- 41:47they
- 41:48want to sell something and they're going
- 41:49to buy an aircraft or they're going to
- 41:50buy a product and they're not
- 41:51necessarily going to know or understand
- 41:53the certification
- 41:56liabilities that that the operator owner
- 41:59is then going to have and then they find
- 42:00out and it's it's a problem for them.
- 42:03So, if if you're importing an aircraft,
- 42:06you know, ask a few questions, you know,
- 42:07call call me directly. Call and ask what
- 42:10are the implications of importing this
- 42:11aircraft or where is it located? Is it
- 42:13coming from Australia? And I'll look at
- 42:15the next one.
- 42:16>> [laughter]
- 42:16>> Right.
- 42:16>> I'm kidding. But do do your due
- 42:18diligence. I mean, that that's that's
- 42:20that's that's the main thing. It's so
- 42:21many all of these problems have come out
- 42:23with people that have not done their
- 42:25research and and gone through this
- 42:27process and they assume that Transport
- 42:29Canada has to import the aircraft. It's
- 42:31not It's not the case.
- 42:33>> Yeah, [snorts] I think that's a a good a
- 42:35good final point to to leave it on
- 42:37there. And Ryan, we look forward to
- 42:38seeing you in Kelowna. And uh can
- 42:40catching up there for the MRO
- 42:42conference. Howie, you're going to have
- 42:44a busy time there. Howie's doing a
- 42:46number of panels as well as a couple of
- 42:48presentations to on AI of all things.
- 42:52Howie has a lot of a lot of learning and
- 42:55experience over the especially the past
- 42:57year that he's excited to be able to
- 42:59share with the community, get you uh
- 43:02more aware, more in use, or better
- 43:04understand how it can be a tool for our
- 43:06maintenance community. But Ryan, thank
- 43:08you so much for for joining us. This was
- 43:10a great conversation. Really excited
- 43:11that we were able to finally make it
- 43:13happen. And who knows, we may end up
- 43:15having to do an STC part two at some
- 43:17point.
- 43:18>> Let's do it. There's a lot of points I
- 43:20still have here, so
- 43:21>> [laughter]
- 43:21>> Yeah, me too.
- 43:22>> There you go.
- 43:23>> Amazing, guys. Thank you so much and
- 43:26we'll we'll talk to you soon.
- 43:28>> Stand by for a message after a word from
- 43:29our sponsors.
- 43:31>> Thanks to our [music] sponsor Airbus.
- 43:34Airbus provides the most efficient
- 43:36helicopter solutions to its customers
- 43:38who serve, protect, save lives, and
- 43:41safely carry passengers in demanding
- 43:43environments. Its civil and military
- 43:45helicopters are flying all over the
- 43:47world, making missions possible. Visit
- 43:50airbus.com for more information.
- 43:54>> Vertical, it's the event of the year and
- 43:56it's coming up. This year we're looking
- 43:58at 600 companies, 15,000 attendees, and
- 44:02cutting-edge of vertical aviation
- 44:03technology all under one single roof.
- 44:07I'm being told that there's going
- 44:08[music] to be some new exciting things
- 44:09on the show floor, so you're not going
- 44:12to want to miss it. And it's all
- 44:13happening at my favorite spot, Anaheim.
- 44:15Great restaurants. It's honestly one of
- 44:17my favorite expo spots. You should be
- 44:20joining us for the world's largest
- 44:21vertical aviation trade show and
- 44:23conference, Verticon, powered by VAI.
- 44:27Register now at verticon.org.
- 44:32>> If you're passionate about rotorcraft
- 44:33maintenance, then be sure to check out
- 44:34Verticals new Instagram [music] channel
- 44:36at vertical.mro.
- 44:38Sharing all things related to helicopter
- 44:39maintenance, repair, and overhaul.
- 44:41From the latest podcast episodes to
- 44:43conference updates, and even epic
- 44:44photography, Vertical MRO's dedicated to
- 44:47supporting and advancing rotorcraft
- 44:48maintenance, the backbone of our
- 44:50industry.
About this transcript
This page contains the full transcript of Turning Aircraft Problems Into Engineered Solutions | Ryan Hader - Part II - Ep 119 by Vertical Helicasts!, generated from the public captions YouTube serves with the video. The transcript has 7,760 words across 1,234 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.