The Contract Documents Phase of Building Design — Transcript
Full transcript
- 0:00you've been working closely with your
- 0:01architect for months exploring Concepts
- 0:03and making design decisions suddenly
- 0:05design development ends and you may be
- 0:07hearing from your architect less
- 0:08frequently don't worry they haven't
- 0:10abandoned your project you've simply
- 0:12reached the contract documents phase of
- 0:14the architectural design
- 0:16process in this video we'll cover the
- 0:18contract document phase of the process
- 0:20and what you can
- 0:23[Music]
- 0:25expect hi my name is Josh ruer and I'm
- 0:27an architect here at Newman Munson the
- 0:29contract documents phase occurs after
- 0:31design development and before bidding or
- 0:33construction this phase is also referred
- 0:35to as construction documents or in short
- 0:38CDs although client communication is
- 0:40usually less frequent during this phase
- 0:42your architect is hard at work
- 0:44developing drawings and specifications
- 0:46these documents explain the scope of the
- 0:48work to the contractor and convey the
- 0:49design intent to help you better
- 0:52understand the CD phase we'll break down
- 0:54the process and outline expectations for
- 0:56meetings and deliverables you'll also
- 0:58learn how you can make the most out of
- 1:00this phase and prepare for
- 1:04construction throughout design
- 1:06development you'll plan almost every
- 1:08detail of your project your architect
- 1:10will analyze materials generate opinions
- 1:12of cost and the design team will present
- 1:14options for everything from mechanical
- 1:15systems to paint colors to conclude
- 1:17design development your architect should
- 1:19review the design and provide an updated
- 1:21probable opinion of cost feeling
- 1:23confident that you will not need to make
- 1:25changes this is the time to sign off on
- 1:27the design giving your approval to
- 1:28proceed your architect can now document
- 1:31coordinate and detail the scope of work
- 1:33so the contractor can bid and construct
- 1:35the
- 1:39project throughout the CD phase your
- 1:41architect will create two primary forms
- 1:43of documentation drawings and
- 1:45specifications drawings outline the
- 1:47design intent helping the contractor
- 1:49understand how to put the building
- 1:50together and illustrating the
- 1:51relationships between various elements
- 1:53specifications or specs document the
- 1:55detail guiding materials products and
- 1:57systems among other things specs
- 2:00describe performance requirements
- 2:01standards to follow and specific
- 2:03products to be used ideally you'll
- 2:05finalize the overall design before the
- 2:07CD phase begins making changes will
- 2:10require architect to revise drawings and
- 2:12specifications at a crucial time since
- 2:14Building Systems are connected a change
- 2:16can create a ripple effect throughout
- 2:17the documents your architect will also
- 2:20need to coordinate all changes with any
- 2:21Consultants involved in short changing
- 2:24the design during the CD phase can delay
- 2:26the Project's timeline so anticipate
- 2:28plan accordingly
- 2:33throughout schematic design and design
- 2:35development you'll meet with your
- 2:36architect on a weekly or bi-weekly basis
- 2:38to discuss the Design's progress and
- 2:40make decisions in the CD phase meetings
- 2:42tend to be less frequent although this
- 2:44phase is less client phasing your
- 2:46architect should maintain regular
- 2:48communication the number of meetings
- 2:49will depend on your project but your
- 2:51architect should regularly update you on
- 2:53their progress and address any questions
- 2:55that arise as documents are finalized at
- 2:57your request your architect can guide
- 2:59you through through predesignated
- 3:00deliverable points often at a percentage
- 3:02of completion of the documents a final
- 3:05page turn is the point at which you'll
- 3:06review the completed documentation you
- 3:08may also receive a final probable
- 3:10opinion of cost if your project is going
- 3:13out to bid your architect will discuss
- 3:15Logistics regarding the process ensure
- 3:17you understand the steps and help you
- 3:18prepare documents to announce the time
- 3:20and place of the
- 3:24bid during the CD phase you'll have
- 3:27fewer time commitments with your
- 3:28architect making it the ideal time to
- 3:30prepare for construction now is the best
- 3:32time to coordinate the day-to-day
- 3:34Logistics of the process ahead if you're
- 3:36planning an addition or expansion it's
- 3:38ideal to create a communication plan for
- 3:39continuing operations and documenting
- 3:41decision-making as well as to set
- 3:43expectations within your team we also
- 3:45recommend considering And discussing
- 3:47contract related issues such as
- 3:49mobilization timing when the
- 3:50construction team will be on site and
- 3:52where the staging area or the space to
- 3:54lay down materials will be located
- 3:57lastly the CD phase is a great time to
- 3:59plan any aspects of your building you
- 4:00will provide yourself and to confirm
- 4:02construction phase services that you
- 4:03will be responsible for while your
- 4:06architect can help you determine
- 4:07Furniture equipment and AV and IT
- 4:09solutions some clients prefer to secure
- 4:11these items on their own there are also
- 4:13thirdparty testing services which
- 4:15typically make the most sense for the
- 4:16owner to coordinate use the CD phase to
- 4:19plan these aspects of your project
- 4:21communicate necessary information to
- 4:22your architect and confirm
- 4:24responsibilities in the contract
- 4:26documents or CD phase your architect
- 4:28will create drawings and specifications
- 4:29to communicate the design intent to the
- 4:31contractor you may have fewer meetings
- 4:33with your architect in this phase making
- 4:35it a great time to plan other aspects of
- 4:37your project communicate expectations
- 4:39with your team and confirm anything you
- 4:40may not be clear on to reduce errors
- 4:43your architect should Implement a
- 4:44quality assurance process a thorough
- 4:46check of all documents also setting
- 4:48aside a construction contingency is a
- 4:50necessity to protect your budget learn
- 4:53more by reading about errors and
- 4:54emissions and contingencies thanks for
- 4:58watching
- 5:10okay
About this transcript
This page contains the full transcript of The Contract Documents Phase of Building Design by Everything Architecture, generated from the public captions YouTube serves with the video. The transcript has 867 words across 151 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, caption language selection, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.