- 0:00Now, if you are giving a hybrid system
- 0:03to the customer, remember we talked
- 0:04about hybrid system, right? So, imagine
- 0:07you're giving a hybrid system. On the
- 0:0812-V category, you can get a hybrid
- 0:10system 1.5 kVA 12-V and 2 kVA 12-V.
- 0:15That's for hybrid. For 24-V, you can get
- 0:194.2 kVA 24-V.
- 0:23And you can also get 3.5 kVA 24-V. You
- 0:27can also get 3 kVA 24-V. That's for
- 0:31hybrid system. Then, for 48-V
- 0:35for inverter selection, you can get 5.5
- 0:38kVA 48-V,
- 0:406.2 kVA 48-V, 10 kVA 48-V and as high as
- 0:45that. So, 48-V is the max voltage in
- 0:49terms of inverter selection. So, you
- 0:52see. So, that is it for inverter. Now,
- 0:54for compatibility,
- 0:56you can't use a 12-V battery on a 24-V
- 1:01inverter. Take note.
- 1:03Your battery bank pairing must match
- 1:06with your inverter voltage. Let's say,
- 1:09for instance, you're using tubular
- 1:11batteries.
- 1:12All tubular batteries are rated in 12-V.
- 1:16Same goes to lead-acid batteries. As you
- 1:18see a lead-acid battery 150 amp, 200
- 1:21amp, 100 amp, they are all rated in
- 1:2412-12 V. For you to get 24-V, you have
- 1:28to series these two batteries together.
- 1:31Seriesing occurs when the positive
- 1:33terminal of one of the battery is being
- 1:35linked to the negative terminal to all
- 1:38the other of that same kind of battery.
- 1:40Now, you have increased the voltage of
- 1:42both of the batteries to 24-V, but the
- 1:44amp of that battery remains the same.
- 1:47So, for you to be able to use maybe a
- 1:50tubular battery for a 48-V system, you
- 1:53have to pair it in order to get 48-V.
- 1:56Now, imagine each of these batteries are
- 1:5812 V, right? For you to get 48 V, what
- 2:01do you do? You series them by four. 12,
- 2:0424, 36, and 48. So, you see you have
- 2:07gotten 48 V,
- 2:09but 200 amps. So, that is it for
- 2:12compatibility. You can't use a 24 V
- 2:15battery on a 48 V inverter. That would
- 2:18not work. It must be of the same
- 2:21voltage. The amperage can range, but the
- 2:24voltage must be the same. So, that is it
- 2:28for inverter compatibility, selection,
- 2:31and also panel
- 2:33types and efficiency, and also wattages.
- 2:36Going over to wire,
- 2:38cable sizing and materials.
- 2:41Wires are very, very essential when you
- 2:43are taking your installation.
- 2:46You can't use a poor size of wire on a
- 2:50large system and you don't cause havoc.
- 2:53Voltages produced and wattages produced
- 2:56from solar panels are so high that if
- 2:59not professional enough, you might end
- 3:02up getting a house burnt up.
- 3:05Now, imagine you are installing a as
- 3:07high as a 48 V system with a battery
- 3:10bank of maybe 30 kW,
- 3:12an inverter of maybe 20 kVA.
- 3:14And you are now using a 2.5 mm cable,
- 3:18solar cable, you end up getting that
- 3:20house burnt. Solar cable ranges in mm
- 3:26per meter squared. We have 2.5 mm,
- 3:31we have 4 mm, we have 6 mm, we have 10
- 3:36mm, we have 16 mm, and also as high as
- 3:4032 mm. Now, each of these cable sizes
- 3:45ranges from the kind of system and the
- 3:47type of system that it is used installed
- 3:49for.
- 3:50You can't use a 2.5 mm cable for a 48
- 3:54volt system. So, if for example, you are
- 3:56doing a simple system that doesn't
- 3:58require high voltage and high wattages,
- 4:01you can use 2.5 mm cable to us 4 mm
- 4:05cable. Now, if the system steps up
- 4:08to maybe centralized voltage is high,
- 4:11but not too high, you can use 6 mm
- 4:14cable. But, anything that involves high
- 4:16voltage connection, you are making use
- 4:19of 10 mm to 16 mm and above. That will
- 4:23require smooth connection. And also,
- 4:27that will make us to avoid overheating
- 4:30of wire cable because when you use wrong
- 4:32wire cable, you find out that it
- 4:34overheats, it melts, it kind of even
- 4:36destroy the inverter that it is being
- 4:38connected to. That's because the cable
- 4:40is not compatible with the system it is
- 4:43used installed for. So, that is it for
- 4:45cable size. Now, for materials,
- 4:47materials that are used in this
- 4:49installation includes trunking pipes,
- 4:51trunking hose,
- 4:53nails,
- 4:54clips. All of these things are very,
- 4:56very necessary to make your installation
- 4:59neat.
- 5:00Each of these thing, inverter has its
- 5:02hook that is being placed on the wall
- 5:05where it is being hanged upon.
- 5:06Kilowatt battery, even if it's the
- 5:08hangable type, it has its hooks. Those
- 5:11are those components that come with it.
- 5:13Trunking pipe, it is used for all the
- 5:15wires that is being used for the
- 5:16connection to pass through it so as to
- 5:19avoid wires being shown on the wall. We
- 5:22have also
- 5:24uh
- 5:26um wooden boards where your changeover
- 5:29system is being screwed to.
- 5:32So, all of these are part of the
- 5:33materials that are used in designing
- 5:37that component. Talking about the
- 5:39requirement for grid connection in
- 5:42Nigeria, we are simply going to look at
- 5:45why connecting your grid power to your
- 5:47hybrid system, whenever you're
- 5:49installing a hybrid system that consists
- 5:51of using both utility power and solar
- 5:55power to power to charge your system,
- 5:57there are some required requirements you
- 5:59have to take note of while using grid
- 6:02connection. And we're going to look at
- 6:03it briefly in this video. Now,
- 6:06grid connection require involves you
- 6:09using your your PHCN power or your
- 6:13prepaid utility
- 6:15power.
- 6:16These are things you need to take note
- 6:18of
- 6:18while connecting your grid power to your
- 6:21system.
- 6:22Especially when you're using a prepaid
- 6:24meter system, you should note
- 6:26that it is going to increase the bill,
- 6:30the electricity bill on the customer's
- 6:33end. Because, you know, as usual, a
- 6:35prepaid meter is being regulated in how
- 6:38much kilowatt you consume.
- 6:41That will determine how much you pay.
- 6:44So, for you to be charging your system,
- 6:48it's going to consume more because it
- 6:50needs high voltage and high wattage
- 6:54for charge to continue. So, it's very
- 6:56advisable that while you're making use
- 6:59of grid to charge your system, you
- 7:01should avoid using a prepaid meter
- 7:03system unless you have the bill to cover
- 7:05for.
- 7:06Now, for those using normal PHCN, you
- 7:09can connect it, but you should note that
- 7:12your voltage should be as high as 240 to
- 7:15230 V.
- 7:17That will enable the system to charge
- 7:19smoothly. Low voltage power cannot
- 7:22charge your system using grid.
- 7:25That is it for grid connection
- 7:27requirement. Understanding
- 7:30solar PV cost analysis.
- 7:33Now, in this video, we're going to
- 7:35simply understand how you can save up in
- 7:38purchasing a solar system.
- 7:41Now, you should take note that your
- 7:44major target is capacity, not quantity.
- 7:51If you are getting
- 7:53expensive materials when it comes to
- 7:56purchasing a solar system,
- 7:58expensive materials like
- 8:00um solar panels grade A long G panels
- 8:04that are very much expensive than the
- 8:06rest solar panels. You should understand
- 8:09that if you want to be going for the
- 8:11most expensive, you're going to spend
- 8:13more for just a little
- 8:16um capacity that you needed.
- 8:19They We even have
- 8:21batteries of 3.8 kW, but it is 12 V.
- 8:26So, you see. So, imagine the customer
- 8:29say, "Okay, please, I just want to power
- 8:32um deep freezer. I just want to power
- 8:34lighting, just something simple, deep
- 8:36freezer, lighting, and fan."
- 8:38You can now just end up and you start
- 8:41analyzing and analyzing and you say,
- 8:42"Okay, okay,
- 8:43uh let me go and give you
- 8:45uh you bring 4 million naira and I will
- 8:47give you deep freezer and fan and
- 8:48light."
- 8:49You know?
- 8:50It It will It will chase the customer
- 8:52away.
- 8:53Rather, you look for the most possible
- 8:55system
- 8:57that of low cost but of high quality and
- 9:00get for the customer. You can say,
- 9:02"Okay, since you're just using a deep
- 9:04freezer and you're using lighting,
- 9:06instead of us to go for a 24 V or 48 V
- 9:09system that's going to cost you, let us
- 9:11maintain a 12 V system, but we increase
- 9:14the capacity."
- 9:15That's what makes you a professional.
- 9:17So, now, instead of you going for 24 V
- 9:20system, 2.5 kW, or 24 V system, 5 kW,
- 9:24you can get a 3.5 kW 12 V system.
- 9:29You cannot get a 12 V hybrid inverter.
- 9:33And now, you can just make use of two or
- 9:35three of long G panels.
- 9:38You see? Instead of now spending about
- 9:412.5 million naira for just a 24 volt
- 9:43system, you are now end up spending 1.3
- 9:47million naira to get the same result.
- 9:51The voltage just varies because it is in
- 9:5412 volt. But in terms of capacity, the
- 9:57battery is 3.5 kilowatts. That's
- 10:00massive. The inverter is 2 KVA. That's
- 10:03also massive for the load. Because the
- 10:05load size is not much. The panels are
- 10:07just three. We are making use of 6650.
- 10:11That's because we want high voltage and
- 10:13high wattage. Remember when I was
- 10:15talking about selecting of panels in
- 10:17terms of installing the best size of
- 10:20panel you should you can get, especially
- 10:22to get the most of charging at the most
- 10:24of sunlight. So you see, you are now
- 10:26saving cost. So you don't have to
- 10:29understand these things so that whenever
- 10:31a customer comes across your way in
- 10:33terms of getting a system, you can make
- 10:35you can do it in such a way that the
- 10:37customer will understand that okay, we
- 10:38are trying to still get a good durable
- 10:41and high system, but we are saving up
- 10:43cost. We are trying to make the payment
- 10:45flexible for them. And not them seeing
- 10:48getting a solar system as of them
- 10:51digging gold.
- 10:53You understand?
About this transcript
This page contains the full transcript of YouTube transcript (t8jIe-K7nTY) , generated from the public captions YouTube serves with the video. The transcript has 1,609 words across 250 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.