Supplemental 6 - Allan McDonald Testimony — Transcript

by The Space Above Us · 16,494 words · 2,394 segments · language en · Watch on YouTube

Full transcript

  1. 0:01[Music]
  2. 0:08hello and welcome to the space above us
  3. 0:11supplemental six Rogers Commission
  4. 0:13testimony of Alan McDonald before we get
  5. 0:18started I want to give a quick warning
  6. 0:20to anyone who just automatically queued
  7. 0:22this up and is driving or something this
  8. 0:24supplemental is quite a bit longer than
  9. 0:26usual coming in at over an hour and a
  10. 0:28half I think it's pretty interesting but
  11. 0:30one a friend of mine balked at the
  12. 0:32extreme length and I figured it'd be
  13. 0:33good to give people a heads up in case
  14. 0:35they wanted to skip to whatever's next
  15. 0:36in your queue
  16. 0:37no hard feelings the intent of the
  17. 0:40supplementals is to be a parallel track
  18. 0:42to the main episodes that is not
  19. 0:44necessarily required to match up one to
  20. 0:46one this way if I want to revisit a
  21. 0:48topic or go into more depth about
  22. 0:50something from my main episode I have a
  23. 0:52built-in mechanism to do that it's a
  24. 0:54little bit confusing since I put them in
  25. 0:55the same feet as the main show to save
  26. 0:57everyone from signing up for two feeds
  27. 0:59but so far it's worked out I only
  28. 1:02mentioned this so that if you are
  29. 1:03actually listening to the supplementals
  30. 1:05disconnected from the main episodes I
  31. 1:07strongly suggest that before listening
  32. 1:09to the supplemental you should listen to
  33. 1:11my coverage of the Challenger accident
  34. 1:12which is in episodes 92 93 and 94 one of
  35. 1:18the defining moments associated with the
  36. 1:20Challenger accident was the fateful
  37. 1:22teleconference between engineers and
  38. 1:24managers at NASA's Marshall Space Flight
  39. 1:26Center and Morton Thiokol incorporated
  40. 1:29the manufacturer of the shuttles solid
  41. 1:31rocket boosters we covered this meeting
  42. 1:33in depth in episode 94 where we learned
  43. 1:36that more in thiokol initially
  44. 1:38recommended against launching challenger
  45. 1:40in such low temperatures several NASA
  46. 1:43managers pushed back questioning the
  47. 1:45logic used to arrive at that
  48. 1:46recommendation a complete reversal of
  49. 1:49the typical relationship between NASA
  50. 1:50and contractors rather than being asked
  51. 1:53to prove that their product was safe
  52. 1:55Morton Thiokol was being asked to prove
  53. 1:57that it was not safe managers at Thiokol
  54. 2:01under what they perceived as pressure
  55. 2:02from NASA reversed their initial
  56. 2:05recommendation and instead said that the
  57. 2:07SRBs on sts 51l should work no
  58. 2:10differently than on sts 51 C as we know
  59. 2:14this led to the tragic loss of both the
  60. 2:16Challenger and its crew but part of how
  61. 2:19we know this is because during the
  62. 2:21invest
  63. 2:21negations of the presidential commission
  64. 2:23tasked with determining what happened
  65. 2:25someone heard something that he knew to
  66. 2:27be wrong put his career on the line and
  67. 2:30stood up to say something that someone
  68. 2:32was Morton Thiokol director of the solid
  69. 2:35rocket motor project Alan McDonald his
  70. 2:38surprise contribution to the proceedings
  71. 2:40are the first the Commission heard that
  72. 2:42more in Thyatira commented against the
  73. 2:45launch would we know as much about the
  74. 2:48Challenger accident if Alan McDonald had
  75. 2:49not stood up maybe the Rogers Commission
  76. 2:52was full of very smart very focused
  77. 2:55people who knew had to get to the bottom
  78. 2:56of a complicated problem so it's
  79. 2:59entirely possible that they would have
  80. 3:00figured it out eventually some other way
  81. 3:02but we'll never know because he did
  82. 3:05which was a pretty gutsy thing to do
  83. 3:08McDonald went on to formally testify in
  84. 3:11front of the Commission in two hearings
  85. 3:13and since one of them was public that
  86. 3:15means that we have actual audio and
  87. 3:17video of his testimony not just
  88. 3:19transcripts what we'll be hearing today
  89. 3:21is the entirety of MacDonald's testimony
  90. 3:24on February 25th 1986 less than a month
  91. 3:27after the accident it's pretty long but
  92. 3:30I found it to be riveting also a couple
  93. 3:33of times the audio dropped out for a few
  94. 3:35seconds so I just cut those sections out
  95. 3:38before we play it I want to say thanks
  96. 3:40to c-span where I got this audio I
  97. 3:42believe that since this hearing was part
  98. 3:45of a presidential commission since I
  99. 3:47probably count as an educational podcast
  100. 3:49and since I paid $1 for the mp3 it
  101. 3:52should be fine to share with all of you
  102. 3:53I'll be sure to include a link to the
  103. 3:56full video in the announcement tweet for
  104. 3:57this episode and the show notes which
  105. 4:00still don't exist but someday will since
  106. 4:03McDonald testifies first I just left the
  107. 4:05opening few minutes of the hearing
  108. 4:07intact so you can hear how something
  109. 4:09like this gets started the first voice
  110. 4:11you'll hear is that of the Commission's
  111. 4:13chairman William Rogers you'll also hear
  112. 4:16questions from other members of the
  113. 4:17Commission including Neil Armstrong
  114. 4:19Sally Ride and Richard Fineman among
  115. 4:21others all right I've talked enough
  116. 4:24let's listen to what Alan McDonald has
  117. 4:26to say
  118. 4:30in our sessions today in tomorrow we
  119. 4:32want to present in the thoughtful and
  120. 4:34orderly manner the facts relating to the
  121. 4:38decision to launch the Challenger
  122. 4:41because of its importance
  123. 4:43I will ask witnesses to identify the
  124. 4:46time and place of any event that they
  125. 4:48are addressing and the names and
  126. 4:50positions of persons who participated
  127. 4:53Commission wants to be fair in the
  128. 4:55presentation of the facts because the
  129. 4:58subject matter may involve possible
  130. 5:00human error as distinguished from
  131. 5:03equipment failure the Commission will
  132. 5:05attempt to give a right of reply as soon
  133. 5:09as possible to any person who believes
  134. 5:12he has been unfairly criticized or whose
  135. 5:14actions may have been in accurately
  136. 5:16portrayed during the last two weeks the
  137. 5:19Commission has encouraged NASA to
  138. 5:22disclose a large number of facts and
  139. 5:24documents relating to the launch which
  140. 5:27has been done as a result we believe the
  141. 5:30public is better able to understand and
  142. 5:32assess many aspects of the accident we
  143. 5:36hope that this process will continue
  144. 5:38until all the facts are fully known and
  145. 5:40as much as possible fully understood
  146. 5:42while the Commission has the
  147. 5:44responsibility under its mandate from
  148. 5:47the President to investigate the
  149. 5:49accident and report its findings the
  150. 5:52media plays a key role in the process by
  151. 5:55keeping the public informed we believe
  152. 5:57it has performed this role well and with
  153. 5:59a high sense of responsibility if the
  154. 6:02Commission effectively performs its
  155. 6:03duties in the media performs its role of
  156. 6:06accurately reporting the facts as they
  157. 6:08develop the public will be well served
  158. 6:10witnesses who appear today will be able
  159. 6:14to comment or to clarify their testimony
  160. 6:17as long as the substance comment on or
  161. 6:20clarify the testimony as long as the
  162. 6:21substance is not already
  163. 6:23of course any additional evidence or
  164. 6:26additional material that might assist
  165. 6:27the Commission in the performance of its
  166. 6:29duties and responsibilities will be
  167. 6:31welcomed the first witnesses this
  168. 6:34morning will be Alan McDonald following
  169. 6:39mr. McDonald and
  170. 6:41at the request of Orton thiokol the
  171. 6:43Commission will next tier J Mason there
  172. 6:46was executive vice president their thigh
  173. 6:48ball first I would like now now I would
  174. 6:52like to call on our executive director
  175. 6:54dr. Kiel who will make a few comments
  176. 6:57before we hear mr. McDonald mr. chairman
  177. 7:01for the benefit of the Commission we
  178. 7:02have put together a chronology of events
  179. 7:05relating to the period when the first
  180. 7:08temperature concerns were raised with
  181. 7:09respect to the Challenger indicating the
  182. 7:12activities and also the participants as
  183. 7:15the Commission understands them based on
  184. 7:16testimony and documentation provide to
  185. 7:19the Commission this chronology has been
  186. 7:22provided to all the witnesses mr.
  187. 7:23chairman so that they'll have an
  188. 7:24opportunity to understand our
  189. 7:27reconstruction of those events and to
  190. 7:29clarify them and also to it as
  191. 7:32appropriate to identify the nature of
  192. 7:34the discussions at each of these
  193. 7:36meetings and activities starting
  194. 7:38approximately from the skrub of the
  195. 7:40originally planned launch of Challenger
  196. 7:43for January 27th at 9:30 8:00 a.m.
  197. 7:46ranging up to the launch of the
  198. 7:48Challenger On January 28 at 11:38 a.m.
  199. 7:52and if there are corrections that have
  200. 7:55to be made on this document we'll make
  201. 7:58them as we go along it's as accurate as
  202. 8:00we can make it its present time now I'd
  203. 8:03like to call on mr. McDonald believes
  204. 8:09yes
  205. 8:12mr. McDonald I think it probably if you
  206. 8:14take the middle chair it might be the
  207. 8:16best I think in to be consistent let's
  208. 8:22swear all the witnesses in again some
  209. 8:25have been sworn and some have not so
  210. 8:27let's swear them all again please mr.
  211. 8:37McDonald you're now employed by FICO
  212. 8:41point fight calling that's correct
  213. 8:43and how long have you been employed by
  214. 8:45them I've been with Morton Thiokol for
  215. 8:47the lower 26 years and you're an
  216. 8:51engineer yes I have a bachelor's degree
  217. 8:54in chemical engineering from Montana
  218. 8:57State University and a master's degree
  219. 8:59in engineering administration from the
  220. 9:00University of Utah and can you give us
  221. 9:06those someone or some history of your
  222. 9:08employment with I call I'm currently the
  223. 9:13director of the space shuttle solid
  224. 9:15rocket motor project our
  225. 9:18responsibilities are or a technical cost
  226. 9:21and schedule performance of the
  227. 9:23Steelcase motors that are flown out of
  228. 9:25Kennedy and also the development
  229. 9:27qualification of the film wonk a solid
  230. 9:29rocket motor be flown out of Vandenberg
  231. 9:32Air Force Base I've had this position
  232. 9:35for a little less than two years I
  233. 9:37started as a director in March of 1984
  234. 9:41of the shuttle restaurant project prior
  235. 9:45to that I was the manager of the project
  236. 9:48engineering division at Morton Thiokol
  237. 9:50which I was a technical responsibility
  238. 9:53from a project engineering standpoint
  239. 9:56for all of the programs in the plant
  240. 9:58with the exception of space shuttle that
  241. 10:01included the Peacekeeper the MX stage
  242. 10:03one Trident 1c for production Trident to
  243. 10:07development the harm mark 104 standard
  244. 10:11missile md2 the improved performance
  245. 10:14base motor to finished a contract on
  246. 10:17qualification of a long-life motor for
  247. 10:19SRAM I had all of the independent
  248. 10:21research
  249. 10:22and development advanced technology
  250. 10:24programs with the rocket propulsion
  251. 10:26laboratory and also some work on airbag
  252. 10:30air cushion restraint systems I had that
  253. 10:34job I guess for about three four years
  254. 10:37prior to coming into the shuttle program
  255. 10:39and prior to that I was the manager of
  256. 10:42the propellant development department
  257. 10:44for a few years and prior to that I was
  258. 10:47the manager of the project engineering
  259. 10:51group for advanced development
  260. 10:53development projects I started a Thiokol
  261. 10:57in 59
  262. 10:59after graduating from Montana State
  263. 11:01University and my first job was involved
  264. 11:05in designing the external insulation for
  265. 11:07the stage one of the Minuteman I did
  266. 11:10that design and I was then chosen as a
  267. 11:13group leader for flight test of the
  268. 11:14Minuteman and was participated in the
  269. 11:17flight test about the first 20 flights
  270. 11:19the Minuteman out of the Cape subsequent
  271. 11:22to that I spent considerable time
  272. 11:24working as a chief engineer on
  273. 11:28development of some controllable solid
  274. 11:30rocket motor concepts for several years
  275. 11:32and worked on a lot of advanced
  276. 11:34development programs before before I
  277. 11:36came in involved in Trident program in
  278. 11:40the early 70s the last three or four
  279. 11:44years where have you spent your time the
  280. 11:48last couple of years
  281. 11:49of course I spent my time as director
  282. 11:51the sawed rocket motor project which
  283. 11:54involves a considerable amount of the
  284. 11:56coordination relative to production of
  285. 12:00the shuttle solid rocket motors
  286. 12:02assessment of the flight readiness
  287. 12:04reviews for the space shuttle solid
  288. 12:06rocket motors I am the chairman of the
  289. 12:10senior material review board for the SRM
  290. 12:14that senior material review board has to
  291. 12:19review all of the discrepancies on any
  292. 12:21of the hardware that's considered a
  293. 12:23criticality one or any that's outside
  294. 12:26the experience base of
  295. 12:28previous experience as chairman that
  296. 12:31Lord
  297. 12:32there's members from our quality group
  298. 12:34or engineering group NASA Marshall
  299. 12:36representatives but I have to sign every
  300. 12:39one of those that they're they're ready
  301. 12:40for flight and also co-chairman of the
  302. 12:43problem review board with Marshall Space
  303. 12:45Flight Center relative to any problems
  304. 12:48that are identified from returned
  305. 12:49Hardware that come back to the cake and
  306. 12:51what actions are taken to to understand
  307. 12:54those problems and provide probably
  308. 12:56fixes for those from prevented from
  309. 12:58occurring my activities in the past year
  310. 13:03to a large extent have been involved
  311. 13:05with design certification the film along
  312. 13:09face solid rocket motor
  313. 13:10I'm also the co-chairman of the Design
  314. 13:14certification team represented by Thal
  315. 13:17and Marshall at the SRM level for that
  316. 13:20and that has taken a conservative amount
  317. 13:21my time this past summer in the series
  318. 13:23of reviews for certifying the graphite
  319. 13:26composite case for our van and ready you
  320. 13:30know how much time did you spend in the
  321. 13:32performance of those duties that at
  322. 13:35Kennedy Space Center well I have been
  323. 13:39alternating with my supervisor the vice
  324. 13:42president of space booster programs mr.
  325. 13:43Joe Gilman stirrer on the Tokyo minster
  326. 13:47and what is his title he's the vice
  327. 13:49president of the space booster programs
  328. 13:52and he and I have been alternating going
  329. 13:55to the Cape supporting the launches of
  330. 13:57the SRM severe emitters my immediate
  331. 14:01supervisor yes and you all invaded going
  332. 14:04to the Cape
  333. 14:05yes how did that work under that works
  334. 14:10out fairly well we both of course have a
  335. 14:12fairly heavy demand on our time with all
  336. 14:15the reviews in the shadow' process
  337. 14:17primarily with the trips to to
  338. 14:19Huntsville in the Marshall Space Flight
  339. 14:21Center I attended of course the STS 51l
  340. 14:26he was that the prior flight and our
  341. 14:29Charter is to attend the L minus one
  342. 14:31meeting if 51
  343. 14:34is the Challenger Lord that's correct
  344. 14:36and you were there at that time which he
  345. 14:39mister kill mister there the previous
  346. 14:42launch he was at the previous launches
  347. 14:44what about the one before that one
  348. 14:45before that I was at and he was the one
  349. 14:49I think for that we've been fairly well
  350. 14:50alternated
  351. 14:52what were your responsibilities when you
  352. 14:55were there at the cave at the time of
  353. 14:58the launch well at the time of the
  354. 15:02launch I was in the firing room to
  355. 15:04launch control center there's a seats
  356. 15:09there that for the monitors of many of
  357. 15:13the functions on this sod rocket
  358. 15:14boosters as well as the TV monitor
  359. 15:17Marshall Space Flight Center has a group
  360. 15:20at their console that involves the
  361. 15:24primary contractors for all of the
  362. 15:27subsystems the SRB has one monitor and
  363. 15:29they have people from USB I will provide
  364. 15:33part of the hardware for this RV and for
  365. 15:36the shuttle we also have a monitor from
  366. 15:39the our support to the space shuttle
  367. 15:43processing contractor that is right next
  368. 15:46to that monitor and mr. Carter Kennedy
  369. 15:50our vice president of our space
  370. 15:51operations at the Cape was at that
  371. 15:54monitor that's right next to the
  372. 15:55Marshall monitor and I was sitting with
  373. 15:57him at the time of the launch I always
  374. 15:59been speaking so much about the
  375. 16:01Challenger launch as I was generally
  376. 16:02speaking generally speaking when you or
  377. 16:04mister kill master are at the Kennedy
  378. 16:05you speak for the company is that it yes
  379. 16:09generally the processes before a launch
  380. 16:14there's an L minus one meeting the day
  381. 16:17before the launch at which time all of
  382. 16:20the problems that were still open prior
  383. 16:24to the L minus one are reviewed with
  384. 16:26just more on his board and assured that
  385. 16:29they're all closed out and were ready
  386. 16:31for the launch subsequent to that
  387. 16:34meeting there's a Paul that is taking he
  388. 16:37takes an oral poll if everyone is
  389. 16:39involved in the launch
  390. 16:41including them as well as polishing
  391. 16:42systems but the payload and everyone
  392. 16:44else and every contractor that is
  393. 16:46involved in that has to answer to the
  394. 16:48poles whether they're ready to go and
  395. 16:50launch I attended that meeting as you
  396. 16:54know the L minus one meeting was
  397. 16:57conducted I leave on Saturday or
  398. 17:00something boy if you don't want to come
  399. 17:02to that and it's honestly just a moment
  400. 17:04but so at those meetings when you were
  401. 17:07there you spoke for Thiokol yes I spoke
  402. 17:10for that comp and how long had you been
  403. 17:14there prior to the launch of the
  404. 17:16challenger physically located at Kennedy
  405. 17:19I was that Marshall Space Flight Center
  406. 17:22earlier in the week on some negotiations
  407. 17:26for our subsequent contract and had went
  408. 17:29down to Kennedy on the believe it was
  409. 17:34the Thursday before the launch gives
  410. 17:37home explanation of the relationship
  411. 17:39between yourself and Marshall before you
  412. 17:42went to Kennedy I'm not sure what you
  413. 17:46mean my relationship what what function
  414. 17:49was Marshall performing at that time and
  415. 17:51what were you doing in representing a
  416. 17:53cycle well Marshall has overall
  417. 17:57responsibility for all of the propulsion
  418. 17:59of subsystems on the shuttle and we are
  419. 18:03part of the SRB team I work directly
  420. 18:06with Larry where who is the project
  421. 18:10manager for Marshall on solid rocket
  422. 18:12motor and he works for Larry Malloy he
  423. 18:15was the project manager on the SRB which
  424. 18:17includes the solid rocket motor in the
  425. 18:19aft skirt TVA system and the parachute
  426. 18:23recovery system that makes up the whole
  427. 18:24SRB and I always attend or joke illness
  428. 18:29or attends the launches with mr. Malloy
  429. 18:33and he has the representatives also from
  430. 18:35the other subcontractors for for USB I
  431. 18:37in case there's any questions that come
  432. 18:41up that we can either resolve there or
  433. 18:43or get resolution to prior to launch
  434. 18:46the record where's Marshall located
  435. 18:48Marshalls Lockheed in Huntsville Alabama
  436. 18:50and when did you leave Huntsville
  437. 18:52Alabama to go to Cape Kennedy on this
  438. 18:54occasion well I think it was Wednesday
  439. 18:57or Thursday afternoon before the for the
  440. 18:59launch and you go by yourself or with
  441. 19:02someone no I went by myself now I want
  442. 19:07to give you a an opportunity to give a
  443. 19:10full description of the events the day
  444. 19:13before in the 27th and the day of the
  445. 19:16launch before I do that I I understand
  446. 19:19that you made some notes after the
  447. 19:22accident which put on papers some of
  448. 19:26your recollections of the events
  449. 19:28preceded the accident is that correct
  450. 19:29that is correct and you have those notes
  451. 19:32now yes I have I would like to explain
  452. 19:37to you that you're at liberty to refer
  453. 19:39to those notes in any way you want to
  454. 19:42and now beginning with the first
  455. 19:46recollection you have of the weather
  456. 19:48problem and how it came to your
  457. 19:50attention give us a full account of the
  458. 19:55events of that day in the following day
  459. 19:5727th and 28th we'll try not to interrupt
  460. 20:01you except possibly for clarification I
  461. 20:03want you to feel free to tell everything
  462. 20:05you recall about it and then after that
  463. 20:08we've asked questions about to try to
  464. 20:10amplify any answers that you media well
  465. 20:13I first become aware of the concern of
  466. 20:17the low temperatures that were projected
  467. 20:18for the Cape as late in the afternoon on
  468. 20:22the 27th I was at Carver Kennedy's house
  469. 20:27he's a vice president of ära
  470. 20:30as I mentioned a Space Operations Center
  471. 20:32at the Cape supports the stacking of the
  472. 20:35of the SRMs
  473. 20:36and I had a call from Bob Evelyn he is
  474. 20:40the manager of our ignition system and
  475. 20:43final assembly works for me program
  476. 20:46at all in Utah he called me and
  477. 20:50said that they had just received some
  478. 20:52word earlier that the weatherman was
  479. 20:54projecting temperatures as low as 18
  480. 20:57degrees Fahrenheit sometime in the early
  481. 21:01morning hours of the 28th and that they
  482. 21:03had some meetings with some of the
  483. 21:06engineering people had some concerns
  484. 21:07about the o-rings getting to those kinds
  485. 21:10of temperatures and he wanted to make me
  486. 21:12aware of that and also wanted to get
  487. 21:15some more updated and better information
  488. 21:17on what the actual temperature history
  489. 21:19was going to be predicted so that they
  490. 21:21could make some calculations on what
  491. 21:22they expected the real temperature the
  492. 21:24o-rings macey he was calling from Utah I
  493. 21:29told him that I would get that
  494. 21:31temperature data from for him and call
  495. 21:33him back
  496. 21:34Carver Kennedy then when I hung up
  497. 21:37called the launch operations center to
  498. 21:39get the predicted temperatures from pad
  499. 21:41B as well as what the temperature
  500. 21:43history had been during the day up until
  501. 21:46that time B was the area where the
  502. 21:49launch pad gave as the pad that the
  503. 21:51Challenger was to fly off of and this
  504. 21:53was the first time that would fly off of
  505. 21:55that pad he obtained those temperatures
  506. 21:58from the launch Operations Center and
  507. 22:01they basically said that they felt it
  508. 22:04was going to get near freezing or
  509. 22:06freezing before midnight could be as low
  510. 22:09as 22 degrees as a minimum in the early
  511. 22:11morning hours probably around 6 o'clock
  512. 22:13and that they were predicting a
  513. 22:16temperature of about 26 degrees that the
  514. 22:19intended launch time about nine thirty
  515. 22:21eight the next morning I took that data
  516. 22:24and call back to the plant Senate to Bob
  517. 22:28Ebeling and relayed that to him and told
  518. 22:30him you ought to use this temperature
  519. 22:31data for his predictions and that I
  520. 22:34thought this was very serious and make
  521. 22:36sure that he had the vice president
  522. 22:39Engineering involved in this and all his
  523. 22:41people that I wanted them to put
  524. 22:44together some calculations and a
  525. 22:46presentation material who was the vice
  526. 22:49president of Opera
  527. 22:50Bob lund is our vice president of
  528. 22:52engineering at our Morton Thiokol
  529. 22:55facility in Utah so to make sure that he
  530. 22:57was involved in this and that this
  531. 22:59decision should be an engineering
  532. 23:00decision not a program management
  533. 23:02decision and I told him that I would
  534. 23:06like him to make sure they prepared some
  535. 23:08charts and were in a position to
  536. 23:10recommend the launch temperature this
  537. 23:11don't recommend the launch but recommend
  538. 23:13a launch temperature and have the
  539. 23:14rationale for supporting that launch
  540. 23:17temperature I then hung up and I called
  541. 23:20mr. Malloy he was staying at the Holiday
  542. 23:24Inn in Merritt Island and they couldn't
  543. 23:26reach him so I called Cecil Houston
  544. 23:30Cecil Houston is the resident manager
  545. 23:32for the Marshall Space Flight Center
  546. 23:34office at KSC and told him about our
  547. 23:38concerns with the low temperatures and
  548. 23:40the potential problem of the o-rings and
  549. 23:43he said that he would set up a
  550. 23:45teleconference he had a four wire system
  551. 23:47next to his office his office is right
  552. 23:50across from the VA be in the trailer
  553. 23:52complex see over there and he was set up
  554. 23:55the four wire teleconference involving
  555. 23:57the engineering people at the Marshall
  556. 23:59Space Flight Center in Huntsville our
  557. 24:01people back at I call in Utah and that I
  558. 24:05should come down to his office and
  559. 24:06participate at Kennedy from there and
  560. 24:09that he would get back with me and let
  561. 24:10me know when that time would be
  562. 24:14I waited for a short period of time I
  563. 24:16don't know exactly how long wasn't very
  564. 24:18long he called back told me that he had
  565. 24:21contacted the parties and was all set up
  566. 24:22for 8:15 p.m. Eastern time for that
  567. 24:25teleconference I really relate that
  568. 24:28message on back to the plant told them
  569. 24:30that we have to have charts at that time
  570. 24:32faxed out to Kennedy as well as Marshall
  571. 24:35that we could discuss for that
  572. 24:37teleconference did you explain what
  573. 24:40charts mean well their charts any data
  574. 24:43that we had for showing Hawaii we had
  575. 24:46concerns on the orange of low
  576. 24:48temperatures what our history has been
  577. 24:50what any any calculations we might be
  578. 24:53able to make
  579. 24:54relative to their performance supporting
  580. 24:58it rationale for what it's an acceptable
  581. 25:00temperature what night might not be an
  582. 25:01acceptable temperature and to review
  583. 25:03that and these would all be on charts
  584. 25:06that we would send by a fax machine so
  585. 25:08that people could read those and we can
  586. 25:10discuss those as the rationale for
  587. 25:13either recommending a launch or not that
  588. 25:20I arrived at the Kennedy Space Center at
  589. 25:27about 8:15 and when I arrived there that
  590. 25:31at the Kennedy Space Center the other
  591. 25:34people had already had arrived where
  592. 25:36Larry Malloy was there he is the manager
  593. 25:40the project manager for the SRB for
  594. 25:43Marshall
  595. 25:45Stan reinhardt's was there he is the
  596. 25:48manager of the shuttle project office
  597. 25:50he's flirting Malloy's boss
  598. 25:51Cecil Houston was there the resident
  599. 25:54manager for Marshall and Jack Buchanan
  600. 25:57was there he happens to be our manager
  601. 25:59Martin that calls manager of our launch
  602. 26:01Support Services office at Kennedy the
  603. 26:06telecom hadn't started yet it came on
  604. 26:09the network shortly after I got there
  605. 26:12but was told to hold on because the
  606. 26:15charts had not been received either at
  607. 26:18Marshall or Kennedy at that time and we
  608. 26:20waited I guess for probably another half
  609. 26:22hour before those charts finally came
  610. 26:25through and we could reproduce them that
  611. 26:28they hadn't all even been received yet
  612. 26:30there were some conclusions
  613. 26:31recommendations charts income for about
  614. 26:33a half hour even later than that but
  615. 26:35actually a telephone conference it was
  616. 26:37there actually a network with pictures
  617. 26:39it was a telephone conference just
  618. 26:41telling you could have that you could
  619. 26:43hear the voices from the other two
  620. 26:45places as well as your own however the
  621. 26:48way those teleconferences work there's
  622. 26:50buttons you can push and that will mute
  623. 26:52out you speaking if someone else is
  624. 26:55speaking you could usually hear better
  625. 26:56when you don't have your own mics open
  626. 26:59so there's a lot of conversations I'm
  627. 27:01sure
  628. 27:02all facilities at one time which you
  629. 27:03can't hear but I'll relay on what I had
  630. 27:06heard on the conference as best I can
  631. 27:08the teleconference started I guess close
  632. 27:14to nine o'clock and even though all the
  633. 27:18charts weren't weren't there we were
  634. 27:20told to begin and that Morton Thiokol
  635. 27:22should take the lead and go through the
  636. 27:25charts that they had sent to both
  637. 27:28centers the charts were presented by the
  638. 27:32engineering people from voqal
  639. 27:36the fact by the people that had made
  640. 27:38those particular charts some one were
  641. 27:40typed some handwritten and they
  642. 27:44discussed their concerns with the low
  643. 27:47temperatures relative the possible
  644. 27:49effects on the o-rings primarily the
  645. 27:51timing function the seal the eurowings
  646. 27:54they presented the history of some of
  647. 27:58the data that we had accumulated both in
  648. 28:00static tests and his flight tests
  649. 28:02relative to temperatures and performance
  650. 28:04the o-rings they reviewed the history of
  651. 28:07all of our erosion with any old rings in
  652. 28:09the field joints and he blow by the
  653. 28:12primary o-ring with soot or products of
  654. 28:14combustion of decomposition that we had
  655. 28:16noted in the performance of the
  656. 28:18secondary o-rings and there was an
  657. 28:21exchange amongst the technical people
  658. 28:23and on that date is what it meant and
  659. 28:26discussions but the real exchange never
  660. 28:30really came until the conclusions and
  661. 28:33recommendations came in that point in
  662. 28:37time our Vice President mr. Bob LAN
  663. 28:40presented those charts and he presented
  664. 28:44the charts and the conclusions and
  665. 28:46recommendations and the bottom line was
  666. 28:48is that the engineering people would not
  667. 28:51recommend the launch below 53 degrees
  668. 28:53Fahrenheit the basis for that
  669. 28:55recommendation was primarily our concern
  670. 28:58with the launch that had heard about a
  671. 29:00year earlier in January of 85 I believe
  672. 29:03it was 51 C was our motor number SRM 15
  673. 29:07and that particular
  674. 29:11motor had a couple of filled joints that
  675. 29:13not only had some erosion but they had
  676. 29:15some fairly severe blow by the primary
  677. 29:18seals a fairly heavy suit over a fairly
  678. 29:20large arc very deep and black and even
  679. 29:24though we could see no measurable
  680. 29:27erosion on the secondary o-ring there
  681. 29:29was a heat effect by that it was machine
  682. 29:32was gone off for the o-ring seal that
  683. 29:33wasn't could imagine anything but the
  684. 29:35sheen was gone and because of that we
  685. 29:38were concerned of launching beyond our
  686. 29:41experience base below that temperature
  687. 29:44well that temperature brought a lot of
  688. 29:49strong comments and reaction from
  689. 29:52several of the NASA officials I believe
  690. 29:57was mr. Malloy made some comments about
  691. 29:59when will ever fly if we have to live
  692. 30:02that some sometime in the future and
  693. 30:06also commented that we are trying to
  694. 30:09establish new launch commit criteria we
  695. 30:12can't do that you don't do that night
  696. 30:15before a launch that's a predetermined
  697. 30:17set of constraints and we can't do that
  698. 30:20and other comments were made about
  699. 30:22whether we could ever fly out of
  700. 30:25Vandenberg 24 flights a year because it
  701. 30:27wasn't uncommon that 53 degrees in the
  702. 30:30early morning hours or a lot of the
  703. 30:32launches occur one of the comments that
  704. 30:36came and this was by voice recognition I
  705. 30:38believe is from mr. Hardy Marshall Space
  706. 30:41Flight Center was that he was appalled
  707. 30:43at that recommendation however he also
  708. 30:47said that he certainly wouldn't fly
  709. 30:48without factos concurrence he would not
  710. 30:52fly without backhauls concurrence even
  711. 30:55though he was appalled that that
  712. 30:56recommendation I believe it was Stan
  713. 31:00reinhardt's made a comment that he was
  714. 31:02under the impression that the sod Rock
  715. 31:04motors fall 40-degree recommendation
  716. 31:13someplace in the conversation about the
  717. 31:16impact of 53 degrees I believe Cecil
  718. 31:18Houston that sometime commented that you
  719. 31:21know wouldn't be to about Thursday that
  720. 31:24we would have morning temperatures
  721. 31:25probably in the 50s so he didn't seem to
  722. 31:29be as alarmed about when you know we
  723. 31:31could get to that temperature there were
  724. 31:35several challenges relative to the with
  725. 31:38risk felt how conclusive the effect of
  726. 31:40temperature was on this whole problem of
  727. 31:42erosion or sit blow by and the challenge
  728. 31:46came from looking at the total data
  729. 31:49because even though we were as concerned
  730. 31:52about this flight which was the coldest
  731. 31:54ever and at that time from Florida a
  732. 31:57year earlier there was a flight back in
  733. 32:00the late fall of 85 and English probably
  734. 32:02October 61 a was our SRM 22 set that had
  735. 32:07some blow by do rings no no erosion of
  736. 32:10primary o-rings fact a couple of them I
  737. 32:12believe and this happened to be a launch
  738. 32:16it had the highest temperature so there
  739. 32:18was some concern that the data was
  740. 32:21inconclusive and also that we had some
  741. 32:26motors that were static tested as low as
  742. 32:28thirty six degrees Fahrenheit diem for I
  743. 32:30believe and it showed not only no o-ring
  744. 32:33erosion but no blow by well some of the
  745. 32:35comments that came back from that and I
  746. 32:37believe this Roger Beaujolais commented
  747. 32:39that he felt that there was a
  748. 32:41significant difference in the
  749. 32:43observation of the actual suit that
  750. 32:46passed the primary or ring on the SRM
  751. 32:49fifteen set that was the cold one versus
  752. 32:52the one that was warned that there was a
  753. 32:54much larger arc between the two o-rings
  754. 32:57of it affected the suit was much blacker
  755. 33:00it penetrated all the way up to the
  756. 33:03secondary o-ring and of course we had
  757. 33:04some heat effect there and he thought
  758. 33:05there was a significant difference from
  759. 33:07that well could be the difference just
  760. 33:08due to temperature I commented at that
  761. 33:12time about the static test history I
  762. 33:14told them I did not feel that that was a
  763. 33:16valid data for a couple of reasons one
  764. 33:20on the static test motors the we keep
  765. 33:23the static test motors
  766. 33:24the environmental building essentially
  767. 33:27during the build-up assembly and check
  768. 33:30out of all instrumentation and that
  769. 33:32environmental buildings kept at 72 72
  770. 33:35degrees that buildings then roll back on
  771. 33:37a track about six hours before the
  772. 33:39static test so it wasn't exposed very
  773. 33:41long to the cold temperatures and
  774. 33:44secondly in aesthetic test motors we
  775. 33:48went in and actually repaired and filled
  776. 33:51holes in the putty these holes are
  777. 33:54formed by assembly of the rocket motors
  778. 33:57you form the tank clevis there's air
  779. 33:59trapped in there and that airs got to go
  780. 34:01someplace and sometimes that air will go
  781. 34:05up through the putty we have seen this
  782. 34:07and also when you run the leak check on
  783. 34:10the two seals
  784. 34:11if you get any blow by doing a leak
  785. 34:13check it may tend to propagate those and
  786. 34:15in a static test motors so some of these
  787. 34:18were observed and they went in and fill
  788. 34:20those inside the motor prior to static
  789. 34:24test I told him I didn't feel that that
  790. 34:25data was closer than they shouldn't use
  791. 34:28that for deciding what the o-ring
  792. 34:31performance was at that time there was
  793. 34:38other discussion on some of the charts
  794. 34:40that we had that was somewhat
  795. 34:43inconclusive we had a chart that had
  796. 34:46some sub scale data well we had run some
  797. 34:49tests on global with some sub scale
  798. 34:51o-rings they actually had the full scale
  799. 34:53diameter 280,000 but they were smaller
  800. 34:56that was the cross section of the o-ring
  801. 34:58with their smaller diameter hardware and
  802. 35:01they were a cold gas test and we're
  803. 35:03attempting to try to measure what kind
  804. 35:05of blow by one might get with a
  805. 35:07pressurization rate CC in the motor and
  806. 35:09we were using argon as the working fluid
  807. 35:13also I think some freon and we had run
  808. 35:16tests at around ambient 30 degrees and
  809. 35:18those and did not see any difference so
  810. 35:21there was some conflicting data there
  811. 35:23did it said it
  812. 35:25make any difference but that one in mind
  813. 35:27everyone was a cold test that time I
  814. 35:31commented at the time that I felt that
  815. 35:34lower temperatures were in the direction
  816. 35:37of badness for both always because it
  817. 35:40slows down the timing function for both
  818. 35:42of those but the effect is much worse
  819. 35:44for the primary o-ring compared to the
  820. 35:47secondary o-ring because the leak check
  821. 35:50forces the primary o-ring in the wrong
  822. 35:52side of the o-ring groove while it
  823. 35:55forces the primary o-ring in the proper
  824. 35:58direction this fact should be weighed
  825. 36:03and considered in making an evaluation
  826. 36:04as to what the recommended temperature
  827. 36:08should be I was looking at a chart at
  828. 36:13that time that we had in fact as the
  829. 36:15chart that I had made with some help of
  830. 36:17our engineering people back last summer
  831. 36:19in a presentation I had made here in
  832. 36:21Washington to to headquarters people in
  833. 36:23August 19 there was a chart that showed
  834. 36:26that there's really three phases or
  835. 36:29three regions of concern and during the
  836. 36:32ignition transient relative to
  837. 36:34performance the o-ring first phase of
  838. 36:36that is a condition where the o-ring the
  839. 36:39primary o-ring is pressurized it starts
  840. 36:41as a energizing process and actually has
  841. 36:44to move from the forward face of the
  842. 36:46o-ring groove because that's where it's
  843. 36:48at as a result of leak check and then
  844. 36:50has to move back and seal on the back
  845. 36:53face and this process we felt took took
  846. 36:57place in the early part of the ignition
  847. 36:59transient someplace before it got to 200
  848. 37:02psi and in cold weather what's going to
  849. 37:06affect that is of course the the grease
  850. 37:08that's in that area also is very viscous
  851. 37:10and stiff the o-ring of self is stiff we
  852. 37:14knew that the coal temperature shrank
  853. 37:17the o-ring some and from our resiliency
  854. 37:20tests which are tests that basically
  855. 37:22show how the o-ring responds when you
  856. 37:25have it under some compression and
  857. 37:27release that load shows as it gets cold
  858. 37:30and stiff it doesn't want to respond
  859. 37:31very well
  860. 37:32I looked at at something like flat tire
  861. 37:35on the bottom of a I remember when he
  862. 37:38used to drive nylon tires and was cold
  863. 37:40they get out into her flat spot on them
  864. 37:41and and that o-ring being having to move
  865. 37:45and either's got to slide there's got to
  866. 37:48roll somewhat it's not a very big
  867. 37:50dimension it moves in its twenty thirty
  868. 37:52thousand but certainly can't be as good
  869. 37:55as when you don't have that also being
  870. 37:58hard then has to extrude into the gap
  871. 38:01between the two o-rings sales and the
  872. 38:04harder it is I'm sure it's harder to
  873. 38:06extrude in that gap which means that may
  874. 38:08take a higher pressure to do that which
  875. 38:10also takes longer time I felt that based
  876. 38:15on what we had done in the past we had
  877. 38:17concluded that this blow by phenomenon
  878. 38:20had really occurred in this first part
  879. 38:22of the pressurization cycle and I think
  880. 38:25there was good evidence that it had
  881. 38:27because the soot that appeared between
  882. 38:29the two o-rings was exactly that it was
  883. 38:33soot we analyzed it but it didn't see
  884. 38:35any heat effect on the metal at all some
  885. 38:38cases that discard the grease it didn't
  886. 38:40really burn it some of it wasn't
  887. 38:42products of the grease it could not see
  888. 38:45any real effect on the secondary o-ring
  889. 38:47so it couldn't have happened very long
  890. 38:48it couldn't happen then you're very
  891. 38:51severe conditions but at the same time
  892. 38:54the temperature effects are concerning
  893. 38:57that maybe we were going into another
  894. 38:58timing regime however if we felt that we
  895. 39:03had a good margin there then we felt
  896. 39:06that we do have a good secondary seal
  897. 39:08during this time and I think there's
  898. 39:10been some misconception about the
  899. 39:13redundancy the secondary seal the
  900. 39:18secondary seal is indeed redundant until
  901. 39:21the metal parts between the tank levels
  902. 39:24actually rotate it's a full redundant
  903. 39:26seal and during this time period it is
  904. 39:28redundant and that's important but once
  905. 39:31those metal parts rotate
  906. 39:34you have a problem of resiliency it may
  907. 39:37not be so that's why I was concerned
  908. 39:39about that area but if we convince
  909. 39:42ourselves that the data said that
  910. 39:44wouldn't make that much different in
  911. 39:45that part of the phase then it would be
  912. 39:47a reasonable recommendation to say that
  913. 39:48we wouldn't expect much different
  914. 39:50performance but shortly thereafter that
  915. 39:55cycle was was asked about their
  916. 39:58recommendation I believe in joke
  917. 40:00emminster was asked himself what his
  918. 40:02recommendation would be since it was
  919. 40:04engineering that had recommended not
  920. 40:06flying at 53 and he said that you would
  921. 40:08not go against that recommendation he
  922. 40:10couldn't go against it but based on the
  923. 40:14controversy relative to how conclusive
  924. 40:16the effects of temperature actually were
  925. 40:18on this phenomena we were asked to
  926. 40:21reassess and reevaluate that data and we
  927. 40:26decided we would do that and the people
  928. 40:28at Utah said that well they would like
  929. 40:30to have a caucus for about five minutes
  930. 40:32and offline I asked you to something
  931. 40:36there just a moment go back we come to
  932. 40:39the clock the caucus in a minute but
  933. 40:41come back and and explain what were said
  934. 40:47to to convey the decision of no launch I
  935. 40:53gather at that point the decision by
  936. 40:56Thiokol was to recommend against a
  937. 40:59launch that is correct that was at that
  938. 41:02point the recommendation list was not
  939. 41:03the launch below 53 degrees did this
  940. 41:07talking on that subject was it that was
  941. 41:09Bob London the vice-president
  942. 41:12engineering presented that position but
  943. 41:14did you were you able ascertain from
  944. 41:17that conversation how the engineers as a
  945. 41:20group stood on that well the engineers
  946. 41:24is a group like you know I can't speak
  947. 41:27for the group I was not there but I did
  948. 41:29hear the engineers that presented the
  949. 41:31charts that they actually presented as
  950. 41:33part of that that supported the 53
  951. 41:36degree recommendation and I felt there
  952. 41:38very strong in their conviction is why
  953. 41:40they felt uncomfortable to go outside
  954. 41:42that experience which did who were the
  955. 41:45Roger Beaujolais I think was one of
  956. 41:48strongest ones and Arnie Thompson's that
  957. 41:51presented those positions and presented
  958. 41:54the charts mr. Lowden himself at the
  959. 41:57time he asked mr. Lyon to decide himself
  960. 41:59at the time didn't present the detail
  961. 42:02technical charts but he did present the
  962. 42:04conclusions recommendations and that was
  963. 42:06his recommendation as vice president
  964. 42:08engineer was anybody on the who's on the
  965. 42:12telecom from cycle side recommending
  966. 42:16launch at that time no there was no one
  967. 42:20that recommended launch and I don't
  968. 42:22recall there was anyone that either
  969. 42:24Marshall or backhaul from NASA that
  970. 42:27didn't agree that you know cold
  971. 42:29temperatures went in the wrong direction
  972. 42:31didn't help anything but no no one from
  973. 42:33that call at that time recommended
  974. 42:35launch and what were the comments by
  975. 42:40NASA officials about that recommendation
  976. 42:43that you recall well as I recall there
  977. 42:47are some fairly strong comments about
  978. 42:48being appalled by the recommendation
  979. 42:51about trying to institute new launch
  980. 42:54commit criteria at the last minute about
  981. 42:57when will ever get this launch off that
  982. 43:00those are fairly strong comments those
  983. 43:02become escorting your recollection were
  984. 43:04made by whom well the comments relative
  985. 43:08to the launch commit criteria and when
  986. 43:11will ever get this office made by mr.
  987. 43:12Larry Malloy the comment about being
  988. 43:15appalled was George Hardy he was at
  989. 43:17Marshall I think I recognize his voice
  990. 43:19but I was by a voice recognition so any
  991. 43:26question remember we should have to that
  992. 43:28point in there before you made went off
  993. 43:32the met that you asked to make a comment
  994. 43:34about the secondary wholly ringed seal
  995. 43:37seeking that has been but I asked
  996. 43:39did you make a kite it may catch on to
  997. 43:42this could you recall it yes I think I
  998. 43:45read it to you and I'd be glad to do
  999. 43:48that again I made the comment that lower
  1000. 43:50temperatures are in the direction of
  1001. 43:52badness for both ol rings because it
  1002. 43:55slows down the timing function but the
  1003. 43:57effect is much worse for the primary
  1004. 43:59o-ring compared to the secondary o-ring
  1005. 44:01because the leak check forces the
  1006. 44:03primary o-ring into the wrong side of
  1007. 44:05the groove while the secondary o-ring
  1008. 44:07goes in the right direction and this
  1009. 44:10condition should be evaluated in making
  1010. 44:12the final decision for recommending the
  1011. 44:14lowest acceptable temperature for launch
  1012. 44:16that was a comment I made that confused
  1013. 44:18some people some of the witnesses I
  1014. 44:20spoke to thought that that was a a
  1015. 44:22comment in support of the launch the
  1016. 44:24fact that this secondary whole ring seal
  1017. 44:25would seat well that comment is a
  1018. 44:28good-news bad-news comment there is good
  1019. 44:32news and there's bad news the good news
  1020. 44:34is that the secondary seal is in the
  1021. 44:36right position but that's not unique to
  1022. 44:38temperature it's always that way the bad
  1023. 44:41news is is that the primary seals the
  1024. 44:43one we're depending on for the full
  1025. 44:44ignition transient and it's going to be
  1026. 44:47a lot worse than it was but even the
  1027. 44:48secondary as I mentioned wouldn't be as
  1028. 44:51good cold as it would be normally but I
  1029. 44:54was comment you were not supporting the
  1030. 44:55launch no not by that comment I wasn't
  1031. 44:57supporting the launch I was just saying
  1032. 44:59that's an important consideration and I
  1033. 45:01felt that if we could run some
  1034. 45:02calculations to show that the
  1035. 45:06temperature did not affect the timing
  1036. 45:09then that would be supportive of a
  1037. 45:10launch if it did it certainly and that
  1038. 45:13was the concern that it pushed that
  1039. 45:14timing out long enough we had a chart in
  1040. 45:17there said that if that timing goes
  1041. 45:18beyond that 200 psi regime or you're
  1042. 45:20still our routing the primary o-ring
  1043. 45:22that for whatever reason if you ever buy
  1044. 45:25passes at that time you can't depend on
  1045. 45:26the secondary and that's what's
  1046. 45:28important the time of the caucus then
  1047. 45:31you
  1048. 45:34never favorite launch no and you made it
  1049. 45:38clear that you were opposed to launch
  1050. 45:39well I never said I was opposed to the
  1051. 45:42launch so just made a few comments about
  1052. 45:44why I thought some of the data was not
  1053. 45:47appropriate like the static test were
  1054. 45:49saying the o-rings were good 36 degrees
  1055. 45:51I made this comment about the lower
  1056. 45:56temperatures affecting both though rings
  1057. 45:58but it affects them a little bit
  1058. 45:59differently because one of them it's a
  1059. 46:01dynamic o-ring and moves one of them has
  1060. 46:03a lot more movement and effects on it
  1061. 46:05the other one does because it has to
  1062. 46:07move across the group I made those
  1063. 46:09comments except of the recommendation I
  1064. 46:12accepted the recommendation yes I
  1065. 46:13thought was appropriate recommendation
  1066. 46:15in other words you accept the
  1067. 46:16recommendation of no launch that was
  1068. 46:18made by your company that's correct
  1069. 46:20mister would you would you be surprised
  1070. 46:25if your comments were interpreted by
  1071. 46:30both your own company personnel and
  1072. 46:32Marshall personnel is being supporting
  1073. 46:35of the Marshall position yeah I would be
  1074. 46:38surprised at that yes I think I wouldn't
  1075. 46:42be surprised that that would be
  1076. 46:44evaluated as the vector that I'm
  1077. 46:46surprised that was interpreted as
  1078. 46:48supportive you know mr. McDonald you
  1079. 46:51mentioned the 90 degree qualification
  1080. 46:56limit was that referring to ambient air
  1081. 46:59temperatures well I had a discussion
  1082. 47:02about that later
  1083. 47:05it was my impression that the motor
  1084. 47:08itself was qualified from 40 to 90
  1085. 47:10degrees for operating and we got into a
  1086. 47:16discussion in fact during the the caucus
  1087. 47:19that was supposed to last for five
  1088. 47:20minutes that lasted for about a half
  1089. 47:22hour on that very subject I told the
  1090. 47:26people that were there from NASA that I
  1091. 47:28first of all didn't agree that the motor
  1092. 47:30was even qualified from 40 to 90
  1093. 47:32relative to all of its elements and
  1094. 47:34subsystems I wasn't there in the
  1095. 47:36qualification the Steelcase motor but I
  1096. 47:38just recently went through
  1097. 47:40that process in the film long-case SRM
  1098. 47:43and that I'm not aware of the testing or
  1099. 47:47analysis of the o-rings were good to
  1100. 47:49those temperatures and that therefore
  1101. 47:52it's part of the elements and the way I
  1102. 47:54interpret the DES spec is that all of
  1103. 47:56the components and elements that make up
  1104. 47:59the SRM should be qualified those
  1105. 48:00temperatures mr. Miller Larry Malloy at
  1106. 48:03that time told me well no the 40 degrees
  1107. 48:06refers to a propellant mean bulk
  1108. 48:08temperature and the propellant mean bulk
  1109. 48:10temperature was being predicted to be 55
  1110. 48:13degrees for that launch and that as long
  1111. 48:15as the propellant mean bulk temperature
  1112. 48:17wasn't below 40 degrees that you could
  1113. 48:20expose the other parts of the motor the
  1114. 48:22lower temperature as long as you didn't
  1115. 48:24drop the propellant mean love
  1116. 48:25temperature outside of the 40 degrees I
  1117. 48:28responded a ton I thought that was
  1118. 48:29absolutely ridiculous because you could
  1119. 48:31expose that motor to very severe cold
  1120. 48:34temperatures sub-zero temperatures for a
  1121. 48:36fairly long periods of time you wouldn't
  1122. 48:38change bail mean buck temperature at all
  1123. 48:40it's such a massive amount of propellant
  1124. 48:42insulator there that takes a long time
  1125. 48:44to do that
  1126. 48:44and I'm sure that the spec really didn't
  1127. 48:47mean that that you could so my
  1128. 48:49interpretation is certainly different
  1129. 48:50than his was there in fact the minimum
  1130. 48:55temperature established by specification
  1131. 48:58or by Road or in some manner that
  1132. 49:01related to the o-rings or the joint well
  1133. 49:04I couldn't know I wasn't aware of one
  1134. 49:07for the o-rings I found out later that
  1135. 49:10there was a in our specification it
  1136. 49:13refers to a higher level specification
  1137. 49:15which is level two at Johnson I think as
  1138. 49:18I was 7700 spec that says that the
  1139. 49:21shuttle vehicle has to be capable of
  1140. 49:23launching in 31 to 99 degrees or
  1141. 49:26something like that and therefore since
  1142. 49:28it's a higher level spec that we should
  1143. 49:30be able to comply with that but I'm not
  1144. 49:33aware that all of the elements or
  1145. 49:35subsystems were ever qualified to that
  1146. 49:36further than a higher level spec could
  1147. 49:39you explain its if that specification
  1148. 49:42come down from the
  1149. 49:45Johnson Space Center who is responsible
  1150. 49:48for the overall operation of the vehicle
  1151. 49:49shuttle vehicle and what it's capable of
  1152. 49:53operating in the environments both
  1153. 49:55pre-flight and flight and that
  1154. 49:58specification for the overall vehicle
  1155. 50:00gets incorporated as part of the lower
  1156. 50:03level specifications that go through
  1157. 50:05level three which is Marshall Space
  1158. 50:06Flight Center to the various elements
  1159. 50:08and they refer to that and when they
  1160. 50:10refer to that the way the system is
  1161. 50:13supposed to work is you're supposed to
  1162. 50:14comply with your own specification plus
  1163. 50:16any higher level specifications that may
  1164. 50:18involve the entire shuttle system and I
  1165. 50:22was unaware of that frankly that
  1166. 50:26criteria was in there I'm still a little
  1167. 50:28bit puzzled about it because it doesn't
  1168. 50:30have any time of limitation on it either
  1169. 50:31I was 31 degrees for five minutes or 40
  1170. 50:35days I was there a design temperature
  1171. 50:40limit that the timeless motor was
  1172. 50:42designed with respect to low
  1173. 50:44temperatures I really can't answer that
  1174. 50:46because I wasn't involved in the
  1175. 50:48original design qualification if I may
  1176. 50:50I'd like to continue we can come to some
  1177. 50:52of these other questions I'd like to
  1178. 50:54continue the chronology because they
  1179. 50:56were going fine and you stopped about
  1180. 50:59the caucus mr. Armstrong has a question
  1181. 51:01when one questioned supporting your your
  1182. 51:05answer that you just gave had had Morton
  1183. 51:11Thiokol to your knowledge ever informed
  1184. 51:14NASA that the launch commit criteria
  1185. 51:18were inadequate or did not in fact cover
  1186. 51:22the kinds of conditions that you are
  1187. 51:24concerned about I'm not aware they ever
  1188. 51:26did not to my knowledge and so we're
  1189. 51:29really talking about event that was
  1190. 51:31within the launch criteria launch commit
  1191. 51:33criteria but outside what your
  1192. 51:36experience based was well I I guess I
  1193. 51:38don't even I'm not convinced of that
  1194. 51:40either I didn't learn about
  1195. 51:42the 31 degree thing until sometime
  1196. 51:44afterwards but we were told to make this
  1197. 51:47evaluation on the basis of launching a
  1198. 51:49tow 938 in the morning or the predicta
  1199. 51:52temperature was 26 degrees Fahrenheit
  1200. 51:54that was predicted temperature and that
  1201. 51:56was the decision that's made whether we
  1202. 51:57could launch at that time so I'm not
  1203. 52:00sure where that came from either
  1204. 52:02yeah just one follow-up to Neal's
  1205. 52:05question are you aware of NASA ever
  1206. 52:08asking thiokol to qualify the SRM or the
  1207. 52:12SRB to 31 degrees I'm not aware of it
  1208. 52:15but again I wasn't in that part of the
  1209. 52:17program they may have but I can't say we
  1210. 52:22may know let's go back you said that a
  1211. 52:25suggestion was made that have a recess
  1212. 52:30for five minutes
  1213. 52:31who made that suggestion that suggestion
  1214. 52:36is made from someone at that call I
  1215. 52:39can't recall what that was Joe I think
  1216. 52:41was probably joking minister but I'm not
  1217. 52:43sure you know what happened you said
  1218. 52:47that that lasted almost a half an hour
  1219. 52:50instead of five minutes that's correct
  1220. 52:52then during that time what did you do
  1221. 52:54and who are you with well I was in the
  1222. 52:57conference room at Kennedy with mr.
  1223. 53:00Reinhart
  1224. 53:00and mr. Molloy mr. Houston and Jack
  1225. 53:02Buchanan still and I gave you my
  1226. 53:06conversation about interpretation of the
  1227. 53:08qualification temperature there I also
  1228. 53:11come in at that time that I suggested
  1229. 53:15that maybe we consider a late afternoon
  1230. 53:16launch I didn't feel good about the
  1231. 53:20low-temperature launch because when I
  1232. 53:23had first come down to Kennedy the
  1233. 53:25original schedule was to launch that in
  1234. 53:27the late afternoon I think a quarter to
  1235. 53:29four or something like that and based on
  1236. 53:31the weather report I heard the
  1237. 53:33temperatures would be 48 to 50 degrees
  1238. 53:36in the late afternoon so I said why
  1239. 53:38don't we go to a late afternoon launch
  1240. 53:40and I was told that that was considered
  1241. 53:43but it was rejected because of some
  1242. 53:46problem either with visibility or
  1243. 53:48whether one the transatlantic abort
  1244. 53:50sites
  1245. 53:51English day car Casablanca one of those
  1246. 53:54I really expected the reason that was
  1247. 53:59taking so long for this five-minute
  1248. 54:01caucus was is that we were either trying
  1249. 54:03to find some more information to support
  1250. 54:05our recommendation or that we were
  1251. 54:08trying to run some kind of calculation
  1252. 54:10to determine how far away from that we
  1253. 54:13could go because clearly 26 degrees was
  1254. 54:16long ways from 53 I personally felt we
  1255. 54:19certainly wouldn't go below 40 because I
  1256. 54:21thought my interpretation the
  1257. 54:22qualification was correct and we
  1258. 54:25wouldn't do that but that reason was
  1259. 54:29taken long as the engineers were
  1260. 54:30reassessing all the data they had and
  1261. 54:32finding anymore that they may have and
  1262. 54:35trying to quantify more of part of that
  1263. 54:37date of a straight qualitative and
  1264. 54:41finally they the people from façon Utah
  1265. 54:44did come back on the line
  1266. 54:45after about a half hour and I believe it
  1267. 54:50was Jo elminster came on the line and
  1268. 54:53said that even though we had some
  1269. 54:55concerns about the lower temperatures
  1270. 54:57that we would recommend that they
  1271. 55:00proceed with the launch based on the
  1272. 55:03fact that we felt the temperature data
  1273. 55:05that we had was not totally conclusive
  1274. 55:07and he outlined several concerns still
  1275. 55:12that we had relative the effective
  1276. 55:14temperature but also some rationales why
  1277. 55:16we felt it was safe to proceed what he
  1278. 55:20said well it was the information
  1279. 55:24basically that ended up finally on the
  1280. 55:27facts statement relative to our concerns
  1281. 55:29the o-rings being colder and harder but
  1282. 55:34that we also had some data that was
  1283. 55:38inconclusive relative temperature and
  1284. 55:40I'm sure it was the warmer temperature
  1285. 55:42launch where we had some blow by I
  1286. 55:44didn't see anything that I recognized
  1287. 55:48that was new and for me
  1288. 55:49but maybe they had some Haldol the
  1289. 55:51engineers were certainly there that had
  1290. 55:54generated the original data and
  1291. 55:55evaluating it and maybe they had
  1292. 55:59reconsidered or re-evaluated the data
  1293. 56:02they had and tried to quantify it or
  1294. 56:03conservators probably okay when he
  1295. 56:08completed that he was asked I believe it
  1296. 56:13was by mr. Hardy I'm not sure to you
  1297. 56:15know put that rationale in writing and
  1298. 56:17and assign it make sure they get it down
  1299. 56:23to the Cape I think by morning early
  1300. 56:25morning and I was sitting across table
  1301. 56:28from Larry Malloy at the time and I said
  1302. 56:30well I felt that I was one of those
  1303. 56:32gonna have to sign it because I was that
  1304. 56:33gate I said I would sign that I couldn't
  1305. 56:36it have to come from the plant she'll
  1306. 56:40kill minister said that you know he
  1307. 56:42would draft a letter or a statement and
  1308. 56:45send it down and he would do it tonight
  1309. 56:48wouldn't wait until morning and I was
  1310. 56:51instructed to stay there until that came
  1311. 56:54came down and that he would also send it
  1312. 56:56out to Marshall and then it'd be a few
  1313. 56:58minutes before that would come down he
  1314. 57:04went off line at that time and I asked
  1315. 57:06seasonal Houston where the the fax was
  1316. 57:08and he told me was at the other end of
  1317. 57:11the building I had a conversation with
  1318. 57:14people at that called this point they
  1319. 57:17went offline where they can send that
  1320. 57:19information in the Jack Buchanan's
  1321. 57:21office which was the fax machine right
  1322. 57:22next door to this conference we had or
  1323. 57:25they're gonna send it into the Marshall
  1324. 57:26office they had a Pitney Bowes machine
  1325. 57:29or something and they said well well
  1326. 57:31send in the same one we sent all this
  1327. 57:32other material because they have the
  1328. 57:33right
  1329. 57:34be the marshal one which was the other
  1330. 57:36end of the building so I said fine I
  1331. 57:38would wait again took some time for that
  1332. 57:42fax to get there so all of the parties
  1333. 57:44were in a meeting we're still sitting
  1334. 57:46there and we started to talk about some
  1335. 57:50things I tell them I didn't feel very
  1336. 57:53good about this recommendation and I
  1337. 57:55recognize it's a very difficult to quite
  1338. 57:58quantify at what temperature these seals
  1339. 58:01may be acceptable where they aren't
  1340. 58:03acceptable you know based on that data
  1341. 58:04they're somewhat certainly wasn't
  1342. 58:06conclusive there's no doubt in my mind
  1343. 58:08and that's a difficult thing to quantify
  1344. 58:10but I even though I didn't agree with
  1345. 58:12the 40 degree qualification of the motor
  1346. 58:18that all elements were qualified - that
  1347. 58:21was my understanding that there's a lot
  1348. 58:25of people at both NASA and thiokol
  1349. 58:27signed up to that so the design
  1350. 58:30certification process for the critical
  1351. 58:33design reviews and I was absolutely
  1352. 58:35surprised that NASA would accept any
  1353. 58:37recommendation below 40 degrees
  1354. 58:39Fahrenheit especially when the product
  1355. 58:41predicted temperature as low as 26
  1356. 58:43degrees Fahrenheit don't mind maybe
  1357. 58:46naive about what generates launch commit
  1358. 58:48criteria but I was under the impression
  1359. 58:52that that was generated based on the
  1360. 58:53qualification of all elements or
  1361. 58:55subsystems space shuttle that anything
  1362. 58:58that was outside that qualification was
  1363. 59:00a launch commit criteria and we never
  1364. 59:02went outside that envelope and I don't
  1365. 59:05know why NASA would ever launch below 40
  1366. 59:07degrees Fahrenheit
  1367. 59:08if that's what the SRM was qualified to
  1368. 59:12in fact I made the direct statement that
  1369. 59:15if anything happened to this launch tell
  1370. 59:17them I sure wouldn't want to be the
  1371. 59:19person that had to stand in front of a
  1372. 59:20board of inquiry to explain why I
  1373. 59:23launched this outside of the
  1374. 59:26qualification of the solid rocket motor
  1375. 59:28or any shuttle system when I made that
  1376. 59:31statement no one commented on that I was
  1377. 59:35very still very upset so I
  1378. 59:38I asked that they reconsider this
  1379. 59:43decision for three reasons
  1380. 59:45not one for three I said if I were the
  1381. 59:48launch director I'd cancel this launch
  1382. 59:51for three reasons not just one first one
  1383. 59:53being the concern of the Colo ring so we
  1384. 59:55just discussed but there were two others
  1385. 59:58I just left Carville Kennedy's house in
  1386. 1:00:01the title Titusville Florida and he's
  1387. 1:00:04responsible not only for stacking of the
  1388. 1:00:07SRM she's responsible for the retrieval
  1389. 1:00:08operations and he had been in
  1390. 1:00:11communication with someone that was at
  1391. 1:00:13hangar AF I believe that contacts the
  1392. 1:00:16booster recovery ships at sea and they
  1393. 1:00:21had told him that the booster recovery
  1394. 1:00:23ships were in a absolute survival mode
  1395. 1:00:26it was how they put it that they were in
  1396. 1:00:28seas or high as 30 feet they were there
  1397. 1:00:32was winds at 50 knots sustained
  1398. 1:00:34gusting to 70 knots pitching the boat as
  1399. 1:00:37much as 30 degrees
  1400. 1:00:39they even felt the rough seas may have
  1401. 1:00:41damaged some of the retrieval equipment
  1402. 1:00:43on the back of the ship they were
  1403. 1:00:45steering directly into the wind heading
  1404. 1:00:47for Shore at about three knots and
  1405. 1:00:49they've been doing that for some time
  1406. 1:00:50there's no way that they would be able
  1407. 1:00:52to support early morning launch because
  1408. 1:00:55they wouldn't be in a recovery area I
  1409. 1:00:58then reminded everyone in the room that
  1410. 1:01:01you know there's some firsts on this
  1411. 1:01:02launch this is the first time that we're
  1412. 1:01:04going to use the new electronic control
  1413. 1:01:07system for separating the nozzle
  1414. 1:01:10extension cone on the SRBs
  1415. 1:01:12at Apogee rather than just before water
  1416. 1:01:14impact while it's under full main
  1417. 1:01:16parachute and then we're going to
  1418. 1:01:18separate the parachutes at water impact
  1419. 1:01:20for the very first time on this launch
  1420. 1:01:22and that based on the sea States that I
  1421. 1:01:26had just heard that appeared to me that
  1422. 1:01:28it was going to be nearly impossible to
  1423. 1:01:31recover that hardware he did the
  1424. 1:01:34parachutes or the freshman's that there
  1425. 1:01:37is and also I felt that they were
  1426. 1:01:39putting the boosters at some risk as far
  1427. 1:01:41as recovery was concerned because the
  1428. 1:01:43ship's were steering away
  1429. 1:01:47also said that the third reason for not
  1430. 1:01:50launching is the formation of ice I knew
  1431. 1:01:52the sound suppression systems a water
  1432. 1:01:55system and I felt it probably a lot of
  1433. 1:01:57ice around there and I'm no expert on
  1434. 1:02:00all these matters but I do feel that
  1435. 1:02:01there may be a chance of that changing
  1436. 1:02:04acoustics may be a problem with debris
  1437. 1:02:06may have some effect on the structures I
  1438. 1:02:08didn't know but I didn't think was
  1439. 1:02:10prudent the launch under that kind of a
  1440. 1:02:13condition I was told that you know these
  1441. 1:02:17weren't really my problems and I read
  1442. 1:02:18n't concern myself for these but I said
  1443. 1:02:22you know all three of these together
  1444. 1:02:25should be more than sufficient to cancel
  1445. 1:02:27the launch if the one that we discussed
  1446. 1:02:31earlier wasn't the NASA people were
  1447. 1:02:34there said that too well they would pass
  1448. 1:02:36these on they could tell I was I was
  1449. 1:02:38disturbed and they'd passed those on as
  1450. 1:02:41concerns and that they would do it in an
  1451. 1:02:44advisory capacity I was then asked by
  1452. 1:02:47mr. Malloy where the sign fax was
  1453. 1:02:49because some time had transpired since
  1454. 1:02:51the teleconference had ended then that
  1455. 1:02:53still wasn't there so I said okay I'll
  1456. 1:02:55go check on that I went down to the
  1457. 1:02:57other end of the building to this fax
  1458. 1:03:00machine and there was nothing there and
  1459. 1:03:02come out yet and I really wondered if it
  1460. 1:03:04was working it was getting kind of late
  1461. 1:03:06so I stayed down there I guess for about
  1462. 1:03:09ten minutes and it finally came in
  1463. 1:03:12I brought the fax back it was a single
  1464. 1:03:14sheet of paper to jack Buchanan's office
  1465. 1:03:17where we reproduced copies for everyone
  1466. 1:03:19I walked into when it was Cecil
  1467. 1:03:23Houston's office there and there was a
  1468. 1:03:24telecon being conducted and I believe
  1469. 1:03:26Elizabeth Arne Aldridge and there in the
  1470. 1:03:29middle of this telecon and they were
  1471. 1:03:30discussing the conditions of the booster
  1472. 1:03:33recovery ships and the high sea states
  1473. 1:03:36and the fact they were in the survival
  1474. 1:03:38mode and I recall that Arnie Aldrich
  1475. 1:03:43asked during the law if he felt there
  1476. 1:03:45was any risk to recovering the Boosters
  1477. 1:03:48because of this and he says no he didn't
  1478. 1:03:50think there was any no significant risk
  1479. 1:03:52in recovering the Boosters because they
  1480. 1:03:55had beacons and monitors and they're
  1481. 1:03:57going to bear
  1482. 1:03:57in the area also but that there was a
  1483. 1:04:00high probability that they would not
  1484. 1:04:02recover the parachutes or the frustum
  1485. 1:04:05and the conclusion was that guess they'd
  1486. 1:04:09have to make a decision to launch in the
  1487. 1:04:11basis that they would have high
  1488. 1:04:13probability not recovering that hardware
  1489. 1:04:15but they were compromising the recovery
  1490. 1:04:18of the Boosters significantly and
  1491. 1:04:21remember Arnie asking Larry you know the
  1492. 1:04:25value of that hardware and I think he
  1493. 1:04:27gave some number of close to million
  1494. 1:04:29dollars and asked him if he could afford
  1495. 1:04:31to lose it and support the schedules of
  1496. 1:04:33the program and he said that he had
  1497. 1:04:35sufficient inventory to do that but
  1498. 1:04:39Arnie also told him that in no way have
  1499. 1:04:42those two ships attempt to turn around
  1500. 1:04:44in those kinds of conditions and the
  1501. 1:04:46safety of ships is important to try to
  1502. 1:04:49support that launch and turn around too
  1503. 1:04:52soon so to tell him to continue on
  1504. 1:04:53towards Shore until was really safe to
  1505. 1:04:55turn around
  1506. 1:04:57they then briefly discussed the ice
  1507. 1:05:00issue about the ice and it was a concern
  1508. 1:05:03raised there and Arnie believe it was
  1509. 1:05:06Arnie responded that they had discussed
  1510. 1:05:08that issue earlier in the day so it's
  1511. 1:05:10fairly brief conversation and heard the
  1512. 1:05:14ice I don't know
  1513. 1:05:16and finally the conversation concluded
  1514. 1:05:20and the recommendation was to proceed on
  1515. 1:05:23with the book launch I stayed around a
  1516. 1:05:27few more minutes and talk to Jack the
  1517. 1:05:29Canon for a few minutes um and went back
  1518. 1:05:31to Carver's house in Titusville where I
  1519. 1:05:33stayed and got in there I guess the
  1520. 1:05:35world before 1 o'clock sometime I guess
  1521. 1:05:39that's what tequila asked at the
  1522. 1:05:51conclusion of your testimony executive
  1523. 1:05:54session whether you felt that you were
  1524. 1:05:56under pressure for had been under
  1525. 1:05:58pressure or the company's been under
  1526. 1:06:00pressure to reverse its decision I think
  1527. 1:06:03your answer was yes do you remember that
  1528. 1:06:05yes definitely I there's no doubt in my
  1529. 1:06:08mind I felt some pressure I feel that I
  1530. 1:06:11have a responsible management position
  1531. 1:06:14in here and I felt pressure by the
  1532. 1:06:16strong statement Simon would you explain
  1533. 1:06:18the reasons for the feeling pressure
  1534. 1:06:20well I've I've been in many flight rates
  1535. 1:06:24of use probably as many as as anyone the
  1536. 1:06:27past year and a half at attack Hall and
  1537. 1:06:31I've had to get up and stand before I
  1538. 1:06:34think a very critical audience at
  1539. 1:06:37Marshall a very good one
  1540. 1:06:39justifying why our hardware was ready to
  1541. 1:06:42fly and I have to get up and explain
  1542. 1:06:44every major defect and why we can fly
  1543. 1:06:49with that defect and to the most part
  1544. 1:06:52they're very minor very very minor and
  1545. 1:06:56and I've been hassled about how I'm sure
  1546. 1:06:59that that's okay to fly with no such
  1547. 1:07:02things as losing vacuum in a carbon
  1548. 1:07:05cloth phenolic part in the nozzle while
  1549. 1:07:07the MIT parts basically cured you know
  1550. 1:07:10definitely effective that it's a
  1551. 1:07:11critical process there's a lot of those
  1552. 1:07:13critical processes and I have to dress
  1553. 1:07:15every one of those the great detail is
  1554. 1:07:18why I'm sure that that part has not been
  1555. 1:07:21compromised
  1556. 1:07:22and it's been that way through all the
  1557. 1:07:25reviews I've ever had and that's the way
  1558. 1:07:28it should be it's not pleasant but
  1559. 1:07:31that's what it should be
  1560. 1:07:32and I was surprised here at at this
  1561. 1:07:35particular meeting that the tone of the
  1562. 1:07:37meeting was just opposite of that I
  1563. 1:07:39didn't have to prove I was ready to fly
  1564. 1:07:41in fact I think Bob Crippen made the
  1565. 1:07:43most accurate statement I ever heard his
  1566. 1:07:45conclusion that meeting was is that
  1567. 1:07:48philosophy seemed of change because you
  1568. 1:07:50know he had the same impression idea
  1569. 1:07:52that the contract had always had to get
  1570. 1:07:54up and stand up and prove that his
  1571. 1:07:55hardware was ready to fly in this case
  1572. 1:07:57we had to prove it wasn't and that's a
  1573. 1:08:00big difference
  1574. 1:08:00and I felt that was precious well I
  1575. 1:08:08think the strong statements were made by
  1576. 1:08:10mr. Malloy and even some of those that
  1577. 1:08:13the people at Marshall are on there mr.
  1578. 1:08:16Hardy were early strong statements that
  1579. 1:08:18I took as pressure about one will ever
  1580. 1:08:22fly this thing and launch commit
  1581. 1:08:24criteria that we can't generate last
  1582. 1:08:27minute and appalled by our
  1583. 1:08:30recommendation to fly temperatures high
  1584. 1:08:34as 53 degrees and and that to me that
  1585. 1:08:36that was pressure to me and it may not
  1586. 1:08:38have been interpreted by theirs but it
  1587. 1:08:40was pressure to me that you want to
  1588. 1:08:43refer to it at this time or at any time
  1589. 1:08:47no no I I just felt that the way the
  1590. 1:08:51comments from aid as strong as they were
  1591. 1:08:52made and the fact that the the
  1592. 1:08:55conditions for for justifying this
  1593. 1:08:57launch were it were so much different
  1594. 1:08:58than anything I had been involved with
  1595. 1:09:00before I was the telefax is concerned
  1596. 1:09:03would you normally have signed that
  1597. 1:09:05telefax or was that was the procedure
  1598. 1:09:07that was followed the normal procedure
  1599. 1:09:09well I'm not sure I guess what the
  1600. 1:09:12normal procedure is I felt that since I
  1601. 1:09:15was there representing of the senior
  1602. 1:09:18official at the Cape and I'm the one
  1603. 1:09:21that usually is responsible for that I
  1604. 1:09:23know at the L minus one
  1605. 1:09:25we have a normal launch there's a poll
  1606. 1:09:28that's conducted by Jess more of all the
  1607. 1:09:31contractors were there ready to fly and
  1608. 1:09:33I'm the guy there to ask it up and say
  1609. 1:09:35yeah that calls hardware's ready to fly
  1610. 1:09:37I felt that's my responsibility that's
  1611. 1:09:40why I'm there I can't recall what we
  1612. 1:09:43were asked to sign anything like that
  1613. 1:09:45before we have a presentation that's
  1614. 1:09:49given at every Flight Readiness review
  1615. 1:09:51that signed off by the principal parties
  1616. 1:09:54Joe elements are usually signs all those
  1617. 1:09:56on the formal review but if anything
  1618. 1:09:58comes up afterwards it's it's been done
  1619. 1:10:01on an oral basis but I don't know I've
  1620. 1:10:03never been put in that position I don't
  1621. 1:10:05know if Joe has I don't believe he has
  1622. 1:10:10the the fact that a written decision was
  1623. 1:10:16requested as far as you're concerned was
  1624. 1:10:18not the normal way to do it it was not
  1625. 1:10:21the normal as far as that's concerned
  1626. 1:10:23and as I recall your testimony you
  1627. 1:10:26testified that you made it clear that
  1628. 1:10:28you would not sign a written statement
  1629. 1:10:29approving the launch it might correct
  1630. 1:10:32yeah that's correct I think that's been
  1631. 1:10:34misinterpreted at least by the press
  1632. 1:10:36they said that uh I was overruled by my
  1633. 1:10:39supervisor that's not true at all I
  1634. 1:10:41chose not to sign that I didn't he
  1635. 1:10:44didn't overrule me I felt that that
  1636. 1:10:45decision I started was an engineering
  1637. 1:10:48decision by the people that understood
  1638. 1:10:51the problem the best that had all of the
  1639. 1:10:53data and facts and they're the ones that
  1640. 1:10:54should recommend it and that's why I
  1641. 1:10:55made that it wasn't I was overruled
  1642. 1:10:58thank you very much I'm sure other
  1643. 1:11:00commission members will ask you mr.
  1644. 1:11:01Johnston yeah you were talking about the
  1645. 1:11:0540-degree qualified qualification of
  1646. 1:11:08various components of the solid rocket
  1647. 1:11:11very sturdy and one I was aware of the
  1648. 1:11:1540-degree limit on that on the green
  1649. 1:11:18bulk temperature but was there anything
  1650. 1:11:22else that the 40 degrees referred to
  1651. 1:11:25well in the spec going back after fact
  1652. 1:11:29and looking at it that's what it had
  1653. 1:11:30refers to is a propellant mean buf
  1654. 1:11:32temperature
  1655. 1:11:35I guess that's my opinions an oversight
  1656. 1:11:38may be in the spec or the launch
  1657. 1:11:42temperature of 31 to 99 should be
  1658. 1:11:45stronger in there to apply to all
  1659. 1:11:47components and by qualification that
  1660. 1:11:50either has to be qualified by test or
  1661. 1:11:52some analysis and that means every
  1662. 1:11:53element and I'm not aware that all those
  1663. 1:11:56elements were qualified for that
  1664. 1:11:59temperature I know we bought overhangs
  1665. 1:12:01that said they're good minus 30
  1666. 1:12:03but I never saw the analysis and the
  1667. 1:12:05application that we use them in that
  1668. 1:12:07says that they're they're good to that
  1669. 1:12:09and yes that's a difference it's a
  1670. 1:12:10material problem versus a design problem
  1671. 1:12:12I understand that and I understand that
  1672. 1:12:16the four degrees was intended to protect
  1673. 1:12:18against grain cracking and the
  1674. 1:12:20consequences of that but what what I
  1675. 1:12:25didn't quite understand is why you said
  1676. 1:12:28you wouldn't recommend any time
  1677. 1:12:30launching below 40 degrees I'm trying to
  1678. 1:12:33get up well I felt that's what everybody
  1679. 1:12:37had signed up to is what this thing was
  1680. 1:12:39really qualified from an operating
  1681. 1:12:40standpoint now the motor does get
  1682. 1:12:42exposed to much lower temperatures we
  1683. 1:12:44have a criteria in our specification
  1684. 1:12:47expose that to much lower temperatures
  1685. 1:12:49you know sub-zero temperatures and
  1686. 1:12:5060-mile winds coming across Wyoming
  1687. 1:12:52because we ship these things from Utah
  1688. 1:12:55down to the Cape so in a transportation
  1689. 1:12:57mode they are subjected to some very
  1690. 1:12:59severe temperatures for periods of time
  1691. 1:13:02and there has been analysis to show that
  1692. 1:13:05they will withstand those temperatures
  1693. 1:13:07as long as you don't operate them at
  1694. 1:13:09those temperatures the 40 degrees they
  1695. 1:13:12won't crack there's no problem there
  1696. 1:13:13that's a primarily a performance
  1697. 1:13:16standpoint you lose total impulse and
  1698. 1:13:18performance the lower the temperatures
  1699. 1:13:20you go the gear below 40 you start
  1700. 1:13:22losing performance out of shuttle and
  1701. 1:13:23that's why that number came about as far
  1702. 1:13:26as the capability the grain structural
  1703. 1:13:29capability it can withstand a lot colder
  1704. 1:13:31temperatures than that and we have
  1705. 1:13:33analysis for the storage and
  1706. 1:13:35transportation shows that and it has
  1707. 1:13:36good margins of safety very high margins
  1708. 1:13:38of safety for exposure to lower
  1709. 1:13:41temperatures
  1710. 1:13:42it's just the things like the o-rings
  1711. 1:13:44and some of these other components I'm
  1712. 1:13:45not aware that we have really analyzed
  1713. 1:13:47or tested those well enough to
  1714. 1:13:49understand how they would operate in
  1715. 1:13:52that kind of a temperature there's a
  1716. 1:13:54difference between exposing and storing
  1717. 1:13:57them versus operate used as a
  1718. 1:14:07justification was there an analysis to
  1719. 1:14:11indicate what the o-ring temperature
  1720. 1:14:12during that test was well it was done
  1721. 1:14:16after the fact and I believe in the
  1722. 1:14:18presentation that was made on the night
  1723. 1:14:22before the launch it they calculated
  1724. 1:14:24like 47 degrees is what they presented
  1725. 1:14:26is what they expected the o-ring
  1726. 1:14:28temperature have really been when that
  1727. 1:14:30was that it tested a couple of other
  1728. 1:14:33questions regarding the the conference
  1729. 1:14:36was there a specific request by NASA to
  1730. 1:14:39reconsider or was the reconsideration as
  1731. 1:14:42a result of the implications of the
  1732. 1:14:45remarks made by the NASA people in the
  1733. 1:14:47conference I mean the reconsideration of
  1734. 1:14:51what of the initial decision not to
  1735. 1:14:54launch that is the initial
  1736. 1:14:56recommendation of Thiokol was not to
  1737. 1:14:58launch and then that was reconsidered
  1738. 1:15:01did anyone from NASA explicitly asked
  1739. 1:15:04for reconsideration or would the
  1740. 1:15:06reconsideration occur because of the
  1741. 1:15:08negative remarks and comments on that
  1742. 1:15:11decision well I think it was the latter
  1743. 1:15:15I can't fully recall where they directed
  1744. 1:15:18this to do that or not that we they had
  1745. 1:15:20concluded that the the temperature data
  1746. 1:15:23was inconclusive and I don't know
  1747. 1:15:24whether we volunteered to reassess it or
  1748. 1:15:26they said we need to them it's not clear
  1749. 1:15:28to me on that I'm not sure one further
  1750. 1:15:31question in regard to the signature on
  1751. 1:15:34the sheet which was faxed from mr. Kell
  1752. 1:15:38mr. was there a specific request for
  1753. 1:15:40that to be signed and who made that
  1754. 1:15:42request yeah there was a specific
  1755. 1:15:46request for that to be signed
  1756. 1:15:50I believe it was George Hardy it may
  1757. 1:15:53have been learning the law but I think
  1758. 1:15:55it was charge Hardy had requested that
  1759. 1:15:57time did you consider bringing your
  1760. 1:16:03concerns about the final recommendation
  1761. 1:16:06to the personal attention of mr. war or
  1762. 1:16:12mr. Aldrich or dr. Lucas well I'm very
  1763. 1:16:19familiar with the process by which these
  1764. 1:16:21things are reviewed and I was absolutely
  1765. 1:16:25positive in sure that they would were
  1766. 1:16:28brought to hit their attention because
  1767. 1:16:30that's the way things go I talked to the
  1768. 1:16:33SRB project manager I talked to his boss
  1769. 1:16:35the shuttle project manager the shuttle
  1770. 1:16:38project office and I was sure that those
  1771. 1:16:39all went through that review I had no
  1772. 1:16:41doubt in my mind that they had NASA folk
  1773. 1:16:49indicated that they would pass your
  1774. 1:16:51concerns along and I presume in the
  1775. 1:16:54Joule thought they would the three
  1776. 1:16:57concerns that you were talking about the
  1777. 1:16:59o-rings the ocean seal and the ice right
  1778. 1:17:02but could they have simply meant the
  1779. 1:17:04last two concerns the sea in the ice
  1780. 1:17:06that's one question the other is who
  1781. 1:17:09were the NASA folk that promised to pass
  1782. 1:17:14your concerns along I I guess you could
  1783. 1:17:16interpret maybe as I thought it would be
  1784. 1:17:18all three but the people were mr. Malloy
  1785. 1:17:20and mr. Reinhart said they they would
  1786. 1:17:24pass those on and I presume they passed
  1787. 1:17:26them all on then same reason why they
  1788. 1:17:29wouldn't
  1789. 1:17:38watching should be an engineering
  1790. 1:17:39decision that program management of the
  1791. 1:17:42city how would you characterize the
  1792. 1:17:44final decision to launch from thiokol
  1793. 1:17:47was it engineering or was it management
  1794. 1:17:50well I I guess I'd have to characterize
  1795. 1:17:53it as the management decision in the
  1796. 1:17:55final decision did I understand you to
  1797. 1:18:04say that you chair the board on on crit
  1798. 1:18:07ones on the SRM from YES on all defects
  1799. 1:18:11that are affected by that finish could
  1800. 1:18:13you give us your understanding of the
  1801. 1:18:15meaning of criticality one and just an
  1802. 1:18:19estimate of how many parts in the SRM
  1803. 1:18:21system are classified as current one
  1804. 1:18:23well I don't have a good number for you
  1805. 1:18:27but there's a tremendous amount of crit
  1806. 1:18:29ones on the SRM primarily because the
  1807. 1:18:34motor doesn't have very many redundant
  1808. 1:18:37features solid rocket motors don't
  1809. 1:18:39and of course bottom its structure and
  1810. 1:18:43structure is all becomes a great one if
  1811. 1:18:45it fails Kirtland is a single point
  1812. 1:18:51failure that if that element fails
  1813. 1:18:54there's there's no recovery you lose the
  1814. 1:18:57you lose the hardware and it's
  1815. 1:18:59catastrophic
  1816. 1:19:00there's a lot of elements in the SRM
  1817. 1:19:02there under that category relative to
  1818. 1:19:06the o-ring seals the redundancy was
  1819. 1:19:08built in because that was a critical
  1820. 1:19:10element as a pressure seal in order to
  1821. 1:19:14provide that redundancy I think there is
  1822. 1:19:17some confusion of late as to what that
  1823. 1:19:22Creek 1 1 R was relative the seals and
  1824. 1:19:25how it was removed I wasn't involved at
  1825. 1:19:29the time but it was found that because
  1826. 1:19:32this joint rotated that if you took all
  1827. 1:19:35of the worst engineering tolerances and
  1828. 1:19:39dimensions are allowed by the pram
  1829. 1:19:40that means the maximum clevis opening
  1830. 1:19:44you could have to start with the
  1831. 1:19:46smallest and thinnest tang that you
  1832. 1:19:48could put into that clevis opening and
  1833. 1:19:50the minimum Oh ring that you could put
  1834. 1:19:52in there with a maximum size of the
  1835. 1:19:54grooves that you could possibly put in
  1836. 1:19:56there that you put all those
  1837. 1:19:58combinations together you could show
  1838. 1:20:00that you would actually lose squeeze on
  1839. 1:20:02the secondary o-ring once you pressurize
  1840. 1:20:04the system and the joint rotated and
  1841. 1:20:06therefore if you ever had to call upon
  1842. 1:20:09that o-ring as a redundant system during
  1843. 1:20:12that time period you couldn't depend on
  1844. 1:20:14it out I went back and had an assessment
  1845. 1:20:18made of have we flown any hardware in
  1846. 1:20:23that condition because I was a bit
  1847. 1:20:25shocked about that as much as anyone
  1848. 1:20:27when I first found that out which was by
  1849. 1:20:29the way last August and I made that
  1850. 1:20:31presentation here to NASA headquarters I
  1851. 1:20:35did I wasn't aware of it myself that we
  1852. 1:20:37had such a condition that we were flying
  1853. 1:20:39with a current one on on that part of
  1854. 1:20:41the hardware based on the information
  1855. 1:20:45that I have received on all of the
  1856. 1:20:49joints ever flown on the shuttle there
  1857. 1:20:52was only one time where we had a
  1858. 1:20:55tolerant stack up of a joint that would
  1859. 1:20:59have fallen from a criticality 1r to one
  1860. 1:21:02and that was on STS 4 we have never had
  1861. 1:21:05one since we didn't have one for that
  1862. 1:21:07and we always had adequate squeeze from
  1863. 1:21:10the hardware when it rotates to maintain
  1864. 1:21:13it as a criticality 1r now I understand
  1865. 1:21:17it because I thought that
  1866. 1:21:19the piece of paper in the critical items
  1867. 1:21:21list specifically lists the primary
  1868. 1:21:24o-ring as a criticality one yes it does
  1869. 1:21:27and the reason it does that is because
  1870. 1:21:28the draw drawing tolerances allow you to
  1871. 1:21:31install hardware - that may come
  1872. 1:21:34together on a worst-case basis that it
  1873. 1:21:37cannot guarantee a secondary seal and
  1874. 1:21:39therefore if you can use all the
  1875. 1:21:40hardware that's in the inventory but you
  1876. 1:21:41could possibly have in the inventory
  1877. 1:21:43bill - acceptable prints you could end
  1878. 1:21:45up with a very small fraction of it's a
  1879. 1:21:48very small fraction that could go
  1880. 1:21:49together that way and therefore that
  1881. 1:21:52document was written to cover all that
  1882. 1:21:54but in reality other than that one case
  1883. 1:21:57we've never settled hardware that way
  1884. 1:21:59we've had we haven't had the thinnest
  1885. 1:22:01tangs with the widest open crevices with
  1886. 1:22:03a minimum overrun seven foot together
  1887. 1:22:05that's a concern in a sale as a very
  1888. 1:22:08serious concern in my opinion because
  1889. 1:22:11that decision was made at the time based
  1890. 1:22:14on what we knew about joint rotation
  1891. 1:22:17since that time we're getting this
  1892. 1:22:19information on resiliency in effects of
  1893. 1:22:21temperature which were never put into
  1894. 1:22:23that at that time that brings that
  1895. 1:22:24question back out in front yeah you know
  1896. 1:22:27I told you we didn't fly from
  1897. 1:22:29criticality one on one that's true based
  1898. 1:22:32on the decisions and the information is
  1899. 1:22:34known that changed it from one are to
  1900. 1:22:36one just on the tolerances and
  1901. 1:22:38dimensions as far as this resiliency
  1902. 1:22:40thing I can't assess that yet well
  1903. 1:22:43enough to know but I do know we never
  1904. 1:22:45stacked Hardware together that had
  1905. 1:22:47torrents are so bad that we didn't have
  1906. 1:22:49contact of the secondary all right
  1907. 1:22:52neither did one joint but just to be
  1908. 1:22:54clear I guess that you don't on a joint
  1909. 1:22:56by joint basis go back to the NASA board
  1910. 1:22:59and kind of reclaimer that crit one and
  1911. 1:23:02turn it back into a 1r do you it's
  1912. 1:23:04always classified as a criticality one
  1913. 1:23:06on the primary seal that's actually
  1914. 1:23:08you're correct now we do as part of our
  1915. 1:23:10flight readiness of you do present those
  1916. 1:23:13joints that we're mating and what those
  1917. 1:23:14orange squeezes are and on every flight
  1918. 1:23:17did any discussion of the primary seal
  1919. 1:23:21as a criticality one come up during the
  1920. 1:23:23your meetings on audio minus one no they
  1921. 1:23:27did you suggested that the secondary CEO
  1922. 1:23:32would not be much affected by the
  1923. 1:23:33temperature but now you're telling us
  1924. 1:23:35that because of the complete or nearly
  1925. 1:23:38complete loss of resilience that is the
  1926. 1:23:41tendency to spring back the secondary
  1927. 1:23:43seal would require very little rotation
  1928. 1:23:45to open do I understand correctly I said
  1929. 1:23:49it wouldn't be as affected as much as
  1930. 1:23:51the primary seal because it doesn't have
  1931. 1:23:55to move from one end of the slot the
  1932. 1:23:57other but as far as the effect of
  1933. 1:23:58resilience you're absolutely correct it
  1934. 1:24:00still has the same problem as far as
  1935. 1:24:02extruding in the gap that's still got
  1936. 1:24:03the same problem we were talking about
  1937. 1:24:06it somewhere there was a discussion
  1938. 1:24:08about the secondary seal being redundant
  1939. 1:24:11until the metal parts rotate when the
  1940. 1:24:15pressure starts to build up it can't
  1941. 1:24:17move the primary seal until there is
  1942. 1:24:19some pressure and then there's a very
  1943. 1:24:21small pressure perhaps and a very small
  1944. 1:24:23rotation isn't the true isn't the truth
  1945. 1:24:25the rotations more or less proportional
  1946. 1:24:27to the pressure others there's some
  1947. 1:24:28delay of some sort there is no way time
  1948. 1:24:31delay between them - there is some delay
  1949. 1:24:34because the joints stiff enough that
  1950. 1:24:36under certain pressures you don't move
  1951. 1:24:38it at all so you have to build up some
  1952. 1:24:39pressure to make any rotation so there
  1953. 1:24:42is a delay in that time period but at
  1954. 1:24:44some point in time it becomes a direct
  1955. 1:24:46function of the pressure the laws of
  1956. 1:24:48elasticity such that everything is
  1957. 1:24:50proportional to the force and all of the
  1958. 1:24:52spices of apportionable force then
  1959. 1:24:54wouldn't it be true that at every
  1960. 1:24:56pressure there's some rotation and the
  1961. 1:24:57rotation is more or less proportional to
  1962. 1:24:59the pressure well I think that when
  1963. 1:25:03you're down to few psi or 50 psi I don't
  1964. 1:25:07think
  1965. 1:25:07dating anything you want teddy in 1/10
  1966. 1:25:12as much as you rotated a 500 psi is that
  1967. 1:25:15right well the structure is so stiff
  1968. 1:25:18that I can't believe you're updating at
  1969. 1:25:19all at 50 psi you are moving the o-ring
  1970. 1:25:27seal back into the grill powder to just
  1971. 1:25:32go back to this criticality one so that
  1972. 1:25:34I can understand it a little better in
  1973. 1:25:3919 what 1985 change was made 83 83 82 83
  1974. 1:25:50at that point it was listed as
  1975. 1:25:53criticality 1 with an R is that right
  1976. 1:25:58that's correct
  1977. 1:25:59not does that mean that it was decided
  1978. 1:26:03that if there was a failure and that
  1979. 1:26:07seemed boring that the mission and the
  1980. 1:26:11crew would be destroyed the whole thing
  1981. 1:26:14would be a catastrophe but at that point
  1982. 1:26:16the are met that was there was a
  1983. 1:26:18redundancy there that you had to raise
  1984. 1:26:22that each at that point was considered
  1985. 1:26:24to support the other or at least one was
  1986. 1:26:26a backup for the other that's that's
  1987. 1:26:28what are meant that's correct it's
  1988. 1:26:29redundant means redundant why the RS air
  1989. 1:26:32that's right now at that time experience
  1990. 1:26:35clearly demonstrated that the the
  1991. 1:26:40analysis that you've been using up to
  1992. 1:26:43that point may not have been correct so
  1993. 1:26:46that instead of having both a primary
  1994. 1:26:49and a secondary Co which provided
  1995. 1:26:51redundancy became the conclusion you
  1996. 1:26:53didn't have the redundancy therefore it
  1997. 1:26:57was changed to criticality 1 the arm was
  1998. 1:27:00removed is that correct that's correct
  1999. 1:27:02and so from that point on I believe it
  2000. 1:27:05was in what's the date
  2001. 1:27:09December 82 those shuttles have been
  2002. 1:27:14flown on the basis of criticality 1 so
  2003. 1:27:18there was a failure that sealed the
  2004. 1:27:20catastrophe would result because there
  2005. 1:27:22was no redundancy is that correct well I
  2006. 1:27:25guess that's the interpretation of that
  2007. 1:27:27but recognizing the actual hardware that
  2008. 1:27:30was put together and what we knew at
  2009. 1:27:33that time I don't believe that was that
  2010. 1:27:35was true what was true was is that the
  2011. 1:27:37drawings as I mentioned allowed a
  2012. 1:27:39condition where that could you could fly
  2013. 1:27:42that hardware in that condition just to
  2014. 1:27:45be clear what the SIL says is that the
  2015. 1:27:48primary o-ring is a criticality one and
  2016. 1:27:51you're not allowed to consider the
  2017. 1:27:52secondary o-ring as a backup to that
  2018. 1:27:54that's true Sally that's absolutely
  2019. 1:27:56correct that's what it meant and that
  2020. 1:28:01was that was known I assume by everyone
  2021. 1:28:04that was working on the program with
  2022. 1:28:06most of the top people working on the
  2023. 1:28:07program is that would that be sure well
  2024. 1:28:10I I kind of thought I was when the top
  2025. 1:28:12people work in the program and I didn't
  2026. 1:28:13know that until August of 1985 when I
  2027. 1:28:17put that presentation together I I
  2028. 1:28:19presume it was I did find out there was
  2029. 1:28:22some disagreement between both Thiokol
  2030. 1:28:26and Marshall and interpreting that
  2031. 1:28:28relative to the joint rotation the joint
  2032. 1:28:32rotation of was used for concluding that
  2033. 1:28:35was obtained from two different sources
  2034. 1:28:38one of those sources was from the
  2035. 1:28:40structural test article one first
  2036. 1:28:43structural test article and this is way
  2037. 1:28:45before my time but where this test
  2038. 1:28:50article is taken to Marshall and it's
  2039. 1:28:52basically a four word segment it's
  2040. 1:28:54unloaded now
  2041. 1:28:56a nap segment where they input the both
  2042. 1:29:00the pre-launch loads and they put flight
  2043. 1:29:02loads and all that business into the
  2044. 1:29:04test article and this test is run
  2045. 1:29:08horizontally the arms horizontal and
  2046. 1:29:12they measure through the leap check
  2047. 1:29:14floor to understand or some places the
  2048. 1:29:16actual rotation of these parts and got
  2049. 1:29:20some fairly high numbers up around 60
  2050. 1:29:22thousandths I believe is what they said
  2051. 1:29:24it rotated we had run some tests
  2052. 1:29:28ourselves in a vertical assembly during
  2053. 1:29:31a Hydra test and measured some of the
  2054. 1:29:34rotations and got numbers like 30 to 40
  2055. 1:29:38thousands so there was some disagreement
  2056. 1:29:41as to which numbers were correct
  2057. 1:29:43some of our people felt that the
  2058. 1:29:45horizontal assembly may have made the
  2059. 1:29:48structural test article numbers not
  2060. 1:29:51representative the vertical assembly is
  2061. 1:29:53better and in fact because of that
  2062. 1:29:56disagreement we're in the process and
  2063. 1:30:00started early last summer at the
  2064. 1:30:03direction of Marshall to come up with
  2065. 1:30:04what's called a referee test to do some
  2066. 1:30:08very careful instrumentation in a
  2067. 1:30:10vertical assembly to get a better handle
  2068. 1:30:12on the exact amount of joint rotation
  2069. 1:30:16those joint rotations that are used are
  2070. 1:30:19those that are predicted for the maximum
  2071. 1:30:21expected operating pressure which by the
  2072. 1:30:24way we have never obtained
  2073. 1:30:27fortunately hope we never do but that's
  2074. 1:30:28a three sigma out there someplace but
  2075. 1:30:33that still is a point of controversy as
  2076. 1:30:35to what that number really is because
  2077. 1:30:37the sale I believe that critical items
  2078. 1:30:40list that change that from one
  2079. 1:30:41redundancy to one and not only assume
  2080. 1:30:44the MU LP but I believe it assumed the
  2081. 1:30:47larger rotation which is about 50% more
  2082. 1:30:50than some of the data that we got from
  2083. 1:30:52vertical so I don't I still don't fully
  2084. 1:30:55understand that what I do understand is
  2085. 1:30:58that it was made at the time
  2086. 1:31:00when temperature effects were not known
  2087. 1:31:02and the resiliency problem that doctor
  2088. 1:31:05finally brought up I think some more
  2089. 1:31:06seriously may I ask you just want to
  2090. 1:31:10finish this okay sure going back to
  2091. 1:31:12beginning in 1985 when you've realized
  2092. 1:31:17that the criticality 1 was the who was
  2093. 1:31:20on the critical items list you knew from
  2094. 1:31:24that point on that a single failure
  2095. 1:31:27would be catastrophe as far as the
  2096. 1:31:30mission is concerned well as I mentioned
  2097. 1:31:34earlier that you have to postulate what
  2098. 1:31:40your failure mechanism is and I felt
  2099. 1:31:44very strongly that the blow by that we
  2100. 1:31:49had observed as indeed was on the early
  2101. 1:31:51part of the ignition transient I think
  2102. 1:31:53we all felt that way we've modelled that
  2103. 1:31:55by the way I think fairly reasonably on
  2104. 1:31:57the erosion and that at that point in
  2105. 1:32:00time when the hardware really hasn't had
  2106. 1:32:03a chance to rotate taking the
  2107. 1:32:04temperature effects out now that we do
  2108. 1:32:07indeed have a good redundant seal
  2109. 1:32:09because if we lose the primary o-ring at
  2110. 1:32:11that time that secondary seals in a
  2111. 1:32:14better shape and the primary to really
  2112. 1:32:15seal it hasn't come off its land at all
  2113. 1:32:19if you ignore the resiliency problem in
  2114. 1:32:24a different scenario
  2115. 1:32:26suppose that the resident pressure is
  2116. 1:32:28increasing for some reason the primaries
  2117. 1:32:31are just to understand what the
  2118. 1:32:33situation is the primary seal begins to
  2119. 1:32:35erode and by the time the pressure gets
  2120. 1:32:37to some figure like 600 or 700 psi which
  2121. 1:32:40is I think just below the maximum
  2122. 1:32:42operating pressure
  2123. 1:32:43it finally erodes all the way through so
  2124. 1:32:46that the gas can pass through the
  2125. 1:32:48primary seal would you think there was a
  2126. 1:32:50reasonable probability if the whole
  2127. 1:32:52thing would fail because the rotation by
  2128. 1:32:54that time is enough the secondary seal
  2129. 1:32:56can't hold it yes I think it was and
  2130. 1:32:59that was our assessment notice that
  2131. 1:33:00there was a reasonable probability
  2132. 1:33:02now you first knew what thought of in
  2133. 1:33:04August 1985 that's correct not before
  2134. 1:33:06that's correct right now wouldn't you
  2135. 1:33:10assume that other people who had been
  2136. 1:33:11working on the program and working on
  2137. 1:33:13the sale and the orderings would
  2138. 1:33:14understand that too
  2139. 1:33:16yes I think there's another important
  2140. 1:33:20piece of information back in the end of
  2141. 1:33:25April 85 forgot the exact flight but it
  2142. 1:33:30was the last one in April we had a
  2143. 1:33:35problem with the Joran sealed nozzle
  2144. 1:33:39that flight after it came back the
  2145. 1:33:43nozzle still attached to the aft segment
  2146. 1:33:45and we disassembled the segments when
  2147. 1:33:48they were brought back to the port and
  2148. 1:33:51then they're put on railcar to send back
  2149. 1:33:52to Utah we never got the segment back
  2150. 1:33:54until I don't know sometime a lot of
  2151. 1:33:56part of June or something this flight
  2152. 1:33:58was the very end April we disassembled
  2153. 1:34:01that nozzle we found that we had
  2154. 1:34:03violated the primary seal back in three
  2155. 1:34:06locations and burned completely through
  2156. 1:34:09the secondary seal also had eroded like
  2157. 1:34:1230 mm I bet it held and it did its job
  2158. 1:34:18that was in a nozzle joint the primary
  2159. 1:34:22sealed the nozzle joined as a bore seal
  2160. 1:34:24quite similar to the filled joint
  2161. 1:34:27tolerances are a little different but
  2162. 1:34:29the secondary seal is a face seal it's
  2163. 1:34:34you know they're both somewhat dynamic
  2164. 1:34:36seals this more of a static seal and the
  2165. 1:34:38Varsity of the face seals torque down
  2166. 1:34:40put the bolts and it obviously did his
  2167. 1:34:44job and our conclusion was and in that
  2168. 1:34:47particular instance was that the even
  2169. 1:34:51though we passed the leak check that the
  2170. 1:34:52vacuum buddy may have masked that leak
  2171. 1:34:54check we were using at that time a
  2172. 1:34:57pressure stabilizing pressure to run
  2173. 1:35:01that leak check at 100 psi we had had
  2174. 1:35:04some data
  2175. 1:35:06earlier that showed us that the
  2176. 1:35:09consistency that hoody is quite variable
  2177. 1:35:12and you can actually the putty will come
  2178. 1:35:15a good sealant in many cases and it can
  2179. 1:35:17hold as much as 100 psi for a good
  2180. 1:35:20period of time sometimes they'll blow
  2181. 1:35:22through sometimes it won't so our
  2182. 1:35:24concern was that me were not really
  2183. 1:35:25checking the o-ring seals were checking
  2184. 1:35:27the putty and we're going to make sure
  2185. 1:35:28we're checking the o-ring seals so we
  2186. 1:35:31jacked the pressure up to 200 psi that
  2187. 1:35:33was the last flight that we were still
  2188. 1:35:35under the hundred psi which is the
  2189. 1:35:36previous requirement to stabilize it at
  2190. 1:35:41a hundred and then once you stabilize it
  2191. 1:35:43for a period of time there you drop the
  2192. 1:35:45pressure completely again you bring it
  2193. 1:35:47up to 50 psi and that's what you run the
  2194. 1:35:49leak check at for about 10 minutes and
  2195. 1:35:52we allow one psi drop on that particular
  2196. 1:35:55set of hardware since it was the last
  2197. 1:35:57one we ran with 100 psi because the
  2198. 1:36:01change hadn't gotten through with all
  2199. 1:36:03the paperwork system on what we
  2200. 1:36:04understood about what putty behaves
  2201. 1:36:06under pressure because we went to 200
  2202. 1:36:09psi for the filled joints at that time
  2203. 1:36:11just hadn't gotten a nozzle that we
  2204. 1:36:14concluded that the putty may well have
  2205. 1:36:15masked that leak check as it was at a
  2206. 1:36:17hundred and therefore we may have had
  2207. 1:36:19some defect in that seal that we didn't
  2208. 1:36:22detect and as a result that seal leaked
  2209. 1:36:26that ignition from time to zero and when
  2210. 1:36:31that happens you get severe erosion in
  2211. 1:36:34the ordering because you get the jet
  2212. 1:36:35impingement have we been calculated
  2213. 1:36:37which is direct on to the o-ring seal
  2214. 1:36:39like a flat plate but when you bypass
  2215. 1:36:42the o-ring in a leak like that it
  2216. 1:36:45actually chokes at that points you're
  2217. 1:36:46forming a throat and erodes very rapidly
  2218. 1:36:49from underneath as well as jet of
  2219. 1:36:51henchmen then you lose quite a bit of
  2220. 1:36:52the seal we lost most of the seal in
  2221. 1:36:54fact but the nozzle seal is very good
  2222. 1:36:58the secondary seal that is around the
  2223. 1:36:59corner and expands
  2224. 1:37:02fans down around the quarter and he
  2225. 1:37:06wrote at some of the secondary seal we
  2226. 1:37:09ran a lot of analysis after that because
  2227. 1:37:12that was the first time that we had
  2228. 1:37:14observed erosion of a primary seal we do
  2229. 1:37:18developed our models to predict the
  2230. 1:37:21erosion what would happen in blow by
  2231. 1:37:23erosion and it was because of that that
  2232. 1:37:26we found that hardware and it was late
  2233. 1:37:29in June it was into July that we got all
  2234. 1:37:32that data together we down to Marshall
  2235. 1:37:34and had very detailed reviews because
  2236. 1:37:36that is a was a serious concern to
  2237. 1:37:38everyone that we had violated primary
  2238. 1:37:40seal was in the nozzle joint that we
  2239. 1:37:43were asked to come to Washington the
  2240. 1:37:45headquarters and review that it was very
  2241. 1:37:47serious concerned it was that time that
  2242. 1:37:51I got with the engineering people and
  2243. 1:37:53said we need to put that whole story
  2244. 1:37:55together we need to put the whole story
  2245. 1:37:57together on all the pressure seals
  2246. 1:37:59because I and several others still felt
  2247. 1:38:02that even though that problem happened
  2248. 1:38:03with the nozzle of the field joint was a
  2249. 1:38:05more serious concern because I felt very
  2250. 1:38:08good about the secondary seal in the
  2251. 1:38:10nozzle I didn't for the field Johnny and
  2252. 1:38:13I put together a presentation for August
  2253. 1:38:15that I think showed where our real
  2254. 1:38:17concerns were and why we felt highest
  2255. 1:38:20priority was a field joke even though we
  2256. 1:38:22just experienced that problem with a
  2257. 1:38:24nozzle we felt we had corrected the
  2258. 1:38:27problem with the nozzle because we all
  2259. 1:38:28subsequent flights had the 200 psi leak
  2260. 1:38:31check so that we could not miss a
  2261. 1:38:34possible defective seal or contamination
  2262. 1:38:36that may have prevented that seal from
  2263. 1:38:38seeding in the first place but that was
  2264. 1:38:41some of the background that I think
  2265. 1:38:42really turned up the game on the hole
  2266. 1:38:45seal issue from about April Riddhi and
  2267. 1:38:49June on prior to that time we were doing
  2268. 1:38:52a lot of work to better understand this
  2269. 1:38:54this rotation business and all but we
  2270. 1:38:57have done a tremendous amount of work in
  2271. 1:38:59fact you may have read in the press and
  2272. 1:39:03it's true that we actually had
  2273. 1:39:05went to a SAE conference last fall a
  2274. 1:39:08couple of our top engineers went there
  2275. 1:39:10to try to get help from the wholesale
  2276. 1:39:12industry in the SAE about field joint is
  2277. 1:39:17there a better way to seal that joint is
  2278. 1:39:18there a society of automotive engineers
  2279. 1:39:21and we did a lot of work to try to get
  2280. 1:39:28help from the outside as well as do the
  2281. 1:39:30work we had inside it I think that's all
  2282. 1:39:33relevant to the discussion about the top
  2283. 1:39:37people and the decision making process
  2284. 1:39:39didn't know about this at all didn't
  2285. 1:39:42know about the CIL or the criticality
  2286. 1:39:44minor the whole thing that concern on
  2287. 1:39:47your part or the part of it by calls
  2288. 1:39:49engineers that the original decision had
  2289. 1:39:52been not to launch though that I was
  2290. 1:39:55that on very surprised of that I could
  2291. 1:39:57hardly believe that I the issue is so
  2292. 1:40:00controversial I thought that I'm sure
  2293. 1:40:02that they were aware that I about time
  2294. 1:40:04believing they did in talking about
  2295. 1:40:11criticality one going to 1r I think you
  2296. 1:40:16made the comment that you'd have to have
  2297. 1:40:17all the tolerances going in the wrong
  2298. 1:40:19direction to meet that condition but you
  2299. 1:40:21did say that one unit did meet that
  2300. 1:40:23condition yes best of my knowledge and I
  2301. 1:40:26had some record search done that I was
  2302. 1:40:29told that there was a condition in the
  2303. 1:40:32thankless forward field joint of the SDS
  2304. 1:40:36for some place that was in that
  2305. 1:40:38condition what if that block had been
  2306. 1:40:41done at a cold temperature wouldn't it
  2307. 1:40:42have maybe taken it over the edge I
  2308. 1:40:45don't know it's possible I certainly
  2309. 1:40:50don't feel good about that but
  2310. 1:40:52it's the the reason I ask the question
  2311. 1:40:54it's it seemed to me that if it was
  2312. 1:40:56critical at the one item then everybody
  2313. 1:40:59should treat it as criticality one and
  2314. 1:41:01not rationalized that it may not ever
  2315. 1:41:04happen well I agree with that everybody
  2316. 1:41:08else agrees with that well I think yes
  2317. 1:41:11our engineering people agree to that and
  2318. 1:41:12that's why the recommendation who had
  2319. 1:41:14made originally this was the basis for
  2320. 1:41:17that recommendation we felt that we had
  2321. 1:41:22observed a condition a year earlier that
  2322. 1:41:24we did feel was attributed to
  2323. 1:41:26temperature in some way or another and
  2324. 1:41:28it was not a good condition that we
  2325. 1:41:29didn't want to go much beyond that
  2326. 1:41:32because even though that one was
  2327. 1:41:34successful certainly wasn't a good
  2328. 1:41:36condition that NASA's was at NASA or a
  2329. 1:41:42thiokol that originally initiated the
  2330. 1:41:45change from criticality one art a
  2331. 1:41:48criticality one for the primary over
  2332. 1:41:52well I have to tell you based on what I
  2333. 1:41:55was told because I wasn't involved in
  2334. 1:41:57that change but I was told that that was
  2335. 1:41:59a NASA initiated but what experience led
  2336. 1:42:03to that change do you know I'm not sure
  2337. 1:42:08of what experience led to the change I
  2338. 1:42:10presume it was the understanding from
  2339. 1:42:13the joint rotation data and the drawing
  2340. 1:42:18tolerances of all these parts that that
  2341. 1:42:20condition could exist someplace in the
  2342. 1:42:23hardware and therefore we were going to
  2343. 1:42:25fly the hardware as it was designed that
  2344. 1:42:28either through refurbishment or new
  2345. 1:42:31hardware that was within those storage
  2346. 1:42:32may be matched together sometime to give
  2347. 1:42:34us a condition like that but I I think
  2348. 1:42:36you'd have to ask the people that were
  2349. 1:42:37involved in that particular station how
  2350. 1:42:40do you account for what appears to be
  2351. 1:42:42the fact that between December 82 and
  2352. 1:42:46the middle of 85 and Thiokol became
  2353. 1:42:49concerned about the erosion of the blow
  2354. 1:42:51by that flights did not occur seemingly
  2355. 1:42:57during that time
  2356. 1:42:59that led to the same concern I can't
  2357. 1:43:04explain that I certainly didn't know
  2358. 1:43:06about it until August 8th I don't know I
  2359. 1:43:09think that everyone was concerned at
  2360. 1:43:12least from the standpoint that we always
  2361. 1:43:13had to present data on the joints that
  2362. 1:43:17we were mating the show we had adequate
  2363. 1:43:19squeeze and all you know that data was
  2364. 1:43:23presented and I'm sure people are
  2365. 1:43:24concerned about that if there's no other
  2366. 1:43:29questions we'll have a 10-minute recess
  2367. 1:43:36there it is
  2368. 1:43:37I don't really have any sort of sage
  2369. 1:43:40follow-up to MacDonald's testimony other
  2370. 1:43:42than to say that I found it to be pretty
  2371. 1:43:44remarkable it seems to me that it's
  2372. 1:43:46about as close as we can ever get to a
  2373. 1:43:48proper recording of the actual
  2374. 1:43:50teleconference the night before
  2375. 1:43:51challengers launch is it possible that
  2376. 1:43:54McDonald is embellishing points or
  2377. 1:43:56omitting data that makes him look bad of
  2378. 1:43:58course and he'd have plenty incentive to
  2379. 1:44:00do so but based on the testimony of
  2380. 1:44:03others notes he took at the time and
  2381. 1:44:05crossed checks with other documents and
  2382. 1:44:07what actually happened I think he's
  2383. 1:44:09telling the truth if you'd like to hear
  2384. 1:44:11more from Alan McDonald he wrote a great
  2385. 1:44:13book called truth lies and or ings which
  2386. 1:44:16I found particularly useful for learning
  2387. 1:44:18more about the teleconference itself as
  2388. 1:44:20well as what life was like at Morton
  2389. 1:44:22Thiokol leading up to the accident so if
  2390. 1:44:24this giant episode wasn't enough now you
  2391. 1:44:27know where to find more ad astra catch
  2392. 1:44:30you on the next pass
  2393. 1:44:34[Music]
  2394. 1:44:40you

About this transcript

This page contains the full transcript of Supplemental 6 - Allan McDonald Testimony by The Space Above Us, generated from the public captions YouTube serves with the video. The transcript has 16,494 words across 2,394 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.