  1. 0:05hello doers my name is hosio and welcome
  2. 0:07back for another great tutorial So today
  3. 0:10we're actually talking about subassembly
  4. 0:11which is when we manufacture a component
  5. 0:13before using it to manufacture another
  6. 0:15product you see not every product we
  7. 0:17manufactur has made with pre-made
  8. 0:19components that are bought ready to use
  9. 0:22sometimes we have to get into the
  10. 0:23nitty-gritty and manufacturer products
  11. 0:25components ourselves so for example
  12. 0:27let's take a look at our wheelie table
  13. 0:29product product unsurprisingly it's a
  14. 0:31table with wheels so to manufacture this
  15. 0:35table we need to attach our four wheelie
  16. 0:37legs to a tabletop however before the
  17. 0:40legs can be attached we have to assemble
  18. 0:42them as well by adding our wheel
  19. 0:43component to the bottom of our leg
  20. 0:45component that means that from start to
  21. 0:47finish manufacturing our table requires
  22. 0:49not one but two manufacturing orders
  23. 0:52oros now I could just manufacture a
  24. 0:54bunch of the wheelie legs ahead of time
  25. 0:56you know they're ready whenever we want
  26. 0:58to build a table however I i' rather
  27. 1:00manufacture four legs each time I need
  28. 1:02them for a table and luckily Odo allows
  29. 1:04me to do just that by automatically
  30. 1:06creating anmo for our four wheelie legs
  31. 1:08each time an emmo for the table is
  32. 1:10confirmed so let's manufacture one unit
  33. 1:12of our wheelie table now just so I can
  34. 1:14show you how all of this
  35. 1:16works okay so before we create an emmo
  36. 1:18we need to make sure that our wheelie
  37. 1:19table product and all of its components
  38. 1:21are correctly configured so in order for
  39. 1:23us to do that we actually want to open
  40. 1:25up our manufacturing application and
  41. 1:27we're going to select the word products
  42. 1:28and products object
  43. 1:30obviously so once that we're here we
  44. 1:32want to select our wheelie table so
  45. 1:34let's find that at the bottom over here
  46. 1:36now from the inventory tab that I've now
  47. 1:38opened up over here you can actually see
  48. 1:40that I've enabled the manufacturer route
  49. 1:43now let's actually take a look at the
  50. 1:44table's bombs by clicking on our bill
  51. 1:46material smart button up at the top as
  52. 1:48well and we're going to select it in
  53. 1:49there great so we're there so if I click
  54. 1:52inside of the operations tab you can
  55. 1:53actually see that this product requires
  56. 1:55one operation at our assembly station
  57. 1:57and that happens to be attaching the leg
  58. 1:58to the tabletop so on the components tab
  59. 2:01over here well that requires two
  60. 2:03different components four of the wheelie
  61. 2:05legs as you can tell by the quantity and
  62. 2:07then one of the tabletops so we
  63. 2:09purchased the tabletop from a vendor and
  64. 2:11already have a bunch in stock so we
  65. 2:13don't have to worry about manufacturing
  66. 2:14that we will need to manufacture the
  67. 2:16wheelie leg however so let's open up X
  68. 2:18product so that we could take a look at
  69. 2:20that as well and if we want to jump to
  70. 2:22it we can actually just click on this
  71. 2:23little internal link Arrow right there I
  72. 2:25love that about ODU now inside of here
  73. 2:27let's go to inventory now inside here
  74. 2:30you can see that I've selected the
  75. 2:31replenishment order MTO route as well as
  76. 2:33the manufacturer routes the MTO route
  77. 2:35creates a replenishment order every time
  78. 2:37there's a need for the component since
  79. 2:39the manufacturer route is selected as
  80. 2:40well it creates an ml now I want to take
  81. 2:43a look at this bomb as well for the
  82. 2:44wheelie leg so let's go in there as well
  83. 2:46go into our build materials wheelie leg
  84. 2:48great so here we can actually see that
  85. 2:51each wheelie leg requires one table leg
  86. 2:54and then one wheel as well much like the
  87. 2:56tabletop we purchased both of these
  88. 2:58components but if we wanted to
  89. 2:59manufacture them I could open the
  90. 3:00product pages and configure them the
  91. 3:02same way that I've configured the
  92. 3:03wheelie leg so if I did that eacho for
  93. 3:05the wheelie leg would also create ano
  94. 3:07for each component so if we go over here
  95. 3:09to our operations tab as you can tell we
  96. 3:12also have one operation listed for the
  97. 3:14assembly workstation all right since we
  98. 3:16have both of the wheelie components in
  99. 3:18stock we're actually all ready to
  100. 3:19manufacture the our table so let's go do
  101. 3:22that so I am actually going to start by
  102. 3:24creating an emmo for one unit of the
  103. 3:26wheelie table so to do that we click on
  104. 3:29the word operation and then
  105. 3:31manufacturing orders and then we want to
  106. 3:33select the word new you've done this
  107. 3:34dance with me a lot so let's select our
  108. 3:36wheelie table as our product that we're
  109. 3:38going to be manufacturing and then
  110. 3:40confirm this real quick great so once
  111. 3:42that I do that a few things happen first
  112. 3:45the forecast section over here on our
  113. 3:47components tab as you can tell it tells
  114. 3:49us something it displays today's date
  115. 3:51for the wheelie leg component as well
  116. 3:53this is because we don't have the legs
  117. 3:54available yet but OD recognizes that we
  118. 3:56should be finishing manufacturing for
  119. 3:58them today have do we go about
  120. 4:00manufacturing them well you may have
  121. 4:01also noticed the child Mo smart button
  122. 4:04happens to appear right there H what
  123. 4:07does that do so since we enabled the MTO
  124. 4:09route on our wheelie leg component an
  125. 4:11ammo was created automatically to
  126. 4:13fulfill our need for it as such Odo
  127. 4:15considers that emmo the child of this
  128. 4:17source emmo so we can actually access it
  129. 4:20by clicking on the childo button let's
  130. 4:22click into that so the child emmo is
  131. 4:24linked back to its parents by this
  132. 4:25Source emmo smart button that we have
  133. 4:27now here and down on the component tab
  134. 4:30wouldn't you notice that we can see that
  135. 4:32both the components we need are
  136. 4:33available as we can tell from our
  137. 4:35forecast all right we're now ready to
  138. 4:37begin manufacturing our wheelie table
  139. 4:38but first let me show you how planning
  140. 4:40works for OS that use sub assemblies we
  141. 4:42actually want to make sure that the Emos
  142. 4:43are planned in the correct order so that
  143. 4:45we won't start working on our wheelie
  144. 4:46table ammo before we've actually
  145. 4:48manufactured the wheelie legs so to do
  146. 4:50so we're actually going to head back to
  147. 4:51the manufacturing orders we have the
  148. 4:52breadcrumbs which are Wonder Bread today
  149. 4:55we're going to select them both and
  150. 4:56select plan and then once we do that
  151. 4:59we're going to actually select the
  152. 5:00planning dropdown from the top and then
  153. 5:02we're going to select Planning by
  154. 5:04production and on this page I'm going to
  155. 5:06click on the time period drop down that
  156. 5:08we have over here and I'm going to
  157. 5:09select the day option and would you look
  158. 5:11at that that's going to give me more
  159. 5:12detail about how ouros have been planned
  160. 5:15so we're actually going to select the
  161. 5:16first one that's set to open which
  162. 5:18happens to be our attach wheel component
  163. 5:22right there this is because ODU
  164. 5:24recognizes that the child emmo must be
  165. 5:26completed before the parent emmo do you
  166. 5:28notice that the time listed in the stop
  167. 5:30date field on the popover window for the
  168. 5:32child activity it actually gives us
  169. 5:34something there well if I click away and
  170. 5:38then I click on the parent emmo you'll
  171. 5:41notice something the start date happens
  172. 5:45to be the exact same time this is
  173. 5:47because ODU knows that once the child
  174. 5:48demo is completed all components will be
  175. 5:50available for the parent emmo so it
  176. 5:52schedules it to begin immediately after
  177. 5:54now all we have to do is complete the
  178. 5:55child emo and then we'll be ready to
  179. 5:57start work on the parent emmo at that
  180. 5:58point we'll have Manu ufactured one unit
  181. 6:00of our wheelie table that's pretty cool
  182. 6:02right so for today's example we use a
  183. 6:04manufactured product that requires
  184. 6:06another manufactured product as its
  185. 6:08components however the really cool thing
  186. 6:10about subassembly products in ODU is
  187. 6:12that they can have as many levels as you
  188. 6:14want for example you can manufacture a
  189. 6:16bike spoke which is then used to make a
  190. 6:18bike rim which is then used to make a
  191. 6:20bike wheel which is finally used to
  192. 6:22produce a full bike and as you can see
  193. 6:25ODU simplifies the production of even
  194. 6:27the most complicated multi-step
  195. 6:28Manufacturing workflows that's the best
  196. 6:30part of it well that's it for today
  197. 6:31folks you now know how to manufacture
  198. 6:33products using sub assemblies I'm going
  199. 6:35to see you next time go grab a snack

About this transcript

This page contains the full transcript of Sub-Assemblies | Odoo MRP by Odoo, generated from the public captions YouTube serves with the video. The transcript has 1,420 words across 199 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.