Six Sigma Full Course in 7 Hours | Six Sigma Green Belt Training | Six Sigma Training | Simplilearn — Transcript

by Simplilearn · 56,888 words · 10,288 segments · language en · Watch on YouTube

Full transcript

  1. 0:00[Music]
  2. 0:04hello guys welcome to this six sigma
  3. 0:06full course video by simply learn in
  4. 0:09this video we'll cover everything you'll
  5. 0:11need to know about six sigma and cover
  6. 0:13the major concepts of lean six sigma we
  7. 0:16will start out with an animated video
  8. 0:18covering each of these concepts and go
  9. 0:20into more detail on the dmeic process we
  10. 0:23will also cover the different six sigma
  11. 0:25builds and much more so without further
  12. 0:27ado let's jump right into it before we
  13. 0:30do that don't forget to get subscribed
  14. 0:31to our youtube channel and don't forget
  15. 0:33to hit that bell icon so that you can
  16. 0:35never miss an update from simply learn
  17. 0:37now over to our training experts imagine
  18. 0:40you've been tasked with a really
  19. 0:41important project at work the company
  20. 0:44you're working for produces luxury cars
  21. 0:47the production numbers are going down
  22. 0:49and a lesser number of cars are getting
  23. 0:50manufactured each day there also seems
  24. 0:53to be an issue with the quality of the
  25. 0:54windshield wipers that go on these cars
  26. 0:57the question you are faced with is there
  27. 0:59a way for the company to stop the stall
  28. 1:01in production and increase the
  29. 1:03production per day from 1 000 to 2 000
  30. 1:07also is there a way to find out what's
  31. 1:10causing the drop in the wiper quality
  32. 1:12there is
  33. 1:13six sigma
  34. 1:15six sigma gives you the tools and
  35. 1:17techniques to determine what's making
  36. 1:18the manufacturing process slow down how
  37. 1:21you can eliminate the delays improve the
  38. 1:23process and fix further issues along the
  39. 1:26way the concept was introduced in 1980
  40. 1:29by bill smith while working for motorola
  41. 1:32since then six sigma has seen worldwide
  42. 1:35adoption
  43. 1:36six sigma aims to reduce the time
  44. 1:39defects and variability experienced by
  45. 1:42processes in an organization thanks to
  46. 1:44six sigma you can produce a defect-free
  47. 1:47product
  48. 1:4999.9996 percent of the time allowing
  49. 1:52only 3.4 errors per 1 million
  50. 1:54opportunities
  51. 1:56six sigma also increases customer
  52. 1:58loyalty towards the brand improves
  53. 2:01employee morale leading to higher
  54. 2:03productivity
  55. 2:04six sigma has two major methodologies
  56. 2:07dmaic and dmadv
  57. 2:10let's look at the first methodology
  58. 2:13dmaic is an acronym for define measure
  59. 2:17analyze improve and control
  60. 2:20let's have a look at each of these
  61. 2:22stages individually and how it relates
  62. 2:24to your earlier problem
  63. 2:26in the define phase you determine what
  64. 2:28issues you're facing what your
  65. 2:30opportunities for improvement are and
  66. 2:33what the customer requires of you
  67. 2:35here you look at the process as a whole
  68. 2:37and determine the issues with the
  69. 2:39manufacturing process
  70. 2:41in this case finding out why the cars
  71. 2:43had varying windshield wiper quality and
  72. 2:46how to optimize the current process to
  73. 2:48manufacture more cars in the measure
  74. 2:50phase you determine how the process is
  75. 2:53performing currently in its unaltered
  76. 2:55state you determine the current number
  77. 2:57of cars that are manufactured in a day
  78. 3:00in the current scenario 1000 cars are
  79. 3:02manufactured in a day and each of these
  80. 3:05cars are outfitted with a pair of
  81. 3:06windshield wipers by one of 30 machines
  82. 3:09used some of the metrics measured are
  83. 3:11how many cars are produced in a day time
  84. 3:13taken to assemble a car how many
  85. 3:16windshield wipers were attached in a day
  86. 3:18time that takes them to do so defects
  87. 3:21detected from each machine on assembly
  88. 3:23completion and so on
  89. 3:25following this in the analyze phase you
  90. 3:28determine what caused the defect or
  91. 3:30variation
  92. 3:31on analyzing previous data you find out
  93. 3:34that one of the machines that installed
  94. 3:36the windshield wiper was not performing
  95. 3:38as well as it was supposed to production
  96. 3:41was taking longer since the car chassis
  97. 3:43was being moved across the different
  98. 3:45locations slower as cranes had to
  99. 3:47individually pick and drop the frame
  100. 3:49this was because the wheels were
  101. 3:51attached to the car only in the last
  102. 3:53stage
  103. 3:55next in the improve phase you make
  104. 3:57changes to the manufacturing process and
  105. 3:59ensure the defects are addressed
  106. 4:02you replaced the faulty machines that
  107. 4:04installed the windshield wiper with
  108. 4:05another one you also find a way to save
  109. 4:08time by attaching wheels on the frame in
  110. 4:10the initial stages of the manufacturing
  111. 4:12process unlike how it was done earlier
  112. 4:15now the car can be moved across the
  113. 4:17assembly area faster and finally in the
  114. 4:20control phase you make regular
  115. 4:22adjustments to control new processes and
  116. 4:25future performance based on the changes
  117. 4:27made the company was able to reduce
  118. 4:29production time and manufacture about 2
  119. 4:32000 cars a day with a higher quality of
  120. 4:35output dmaic is one of the most commonly
  121. 4:38used methodologies in the world it
  122. 4:40focuses on improving the existing
  123. 4:42products of the organization
  124. 4:44the second methodology is dmadv which is
  125. 4:48short for define measure analyze design
  126. 4:52and verify
  127. 4:53it is used when the company has to
  128. 4:55create a new product or service from
  129. 4:57scratch it is also called dfss or design
  130. 5:01for six sigma
  131. 5:02let's take the scenario where the
  132. 5:04company decides to build a new model a
  133. 5:07sports car
  134. 5:08in the define phase you define the
  135. 5:10requirements of the customer based on
  136. 5:12inputs from customers historical data
  137. 5:15industry research you determine what you
  138. 5:17need to ensure your car becomes a
  139. 5:19success the data collected indicates
  140. 5:21customers are drawn to cars which can
  141. 5:23achieve more than 150 miles per hour
  142. 5:27customers are also more inclined towards
  143. 5:29cars which have v6 engines and an
  144. 5:31aerodynamic frame
  145. 5:33then in the measure phase you use the
  146. 5:36customer's requirements to create a
  147. 5:37specification
  148. 5:39this specification helps define the
  149. 5:41product in a measurable method so that
  150. 5:43data can be collected and compared with
  151. 5:45specific requirements
  152. 5:47some of the major specifications that
  153. 5:49you focus on are the top speed engine
  154. 5:52type and type of frame
  155. 5:54in the analyze phase you analyze the
  156. 5:57product to determine whether there are
  157. 5:58better ways to achieve the desired
  158. 6:00results areas of improvement are
  159. 6:03determined and tested
  160. 6:05based on the analysis of the prototype
  161. 6:07created in this phase you find that the
  162. 6:09product satisfies just about all of the
  163. 6:11customer requirements except the top
  164. 6:13speed
  165. 6:15so research begins on an aluminum alloy
  166. 6:18that could possibly meet the speed
  167. 6:19requirements of the customer following
  168. 6:22this the design phase based on the
  169. 6:24learnings from the analysis phase the
  170. 6:26new process or product is designed
  171. 6:29revisions are made to the model and the
  172. 6:31car is manufactured with the new
  173. 6:32material the analysis phase is repeated
  174. 6:35based on the new design you also bring a
  175. 6:38focus group and see how they receive it
  176. 6:40based on their feedback further changes
  177. 6:43are made and finally in the verify phase
  178. 6:46you check whether the end result meets
  179. 6:48or exceeds customer requirements
  180. 6:51once you launch your brand new sports
  181. 6:53card you collect customer feedback and
  182. 6:56incorporate it into future designs
  183. 6:58and guess what your customers are loving
  184. 7:02the new design and that is dmadv for you
  185. 7:06six sigma has also found success in a
  186. 7:09number of different industries the
  187. 7:11petrochemical healthcare banking
  188. 7:14government and software are some of the
  189. 7:16industries that have utilized the
  190. 7:18concepts of six sigma to achieve their
  191. 7:21business goals
  192. 7:22another commonly used methodology
  193. 7:24adopted by companies around the world is
  194. 7:26lean lean is a methodology that aims to
  195. 7:29remove any part of the process that does
  196. 7:31not bring value to the customer it means
  197. 7:34doing more with less while doing it
  198. 7:37better the philosophy behind lean comes
  199. 7:39from the japanese manufacturing industry
  200. 7:41by bob hartman who at the time was part
  201. 7:43of toyota
  202. 7:45since then across the world services and
  203. 7:47manufacturing organizations have
  204. 7:49incorporated lean within their
  205. 7:51businesses
  206. 7:52but what if you could have the best of
  207. 7:54both worlds a combination of both six
  208. 7:57sigma and length
  209. 7:59that's lean six sigma before we get into
  210. 8:02lean six sigma we've got a quiz for you
  211. 8:05what methodology is used by companies
  212. 8:08when they want to release a new product
  213. 8:10created from scratch a
  214. 8:12design measure analyze define verify
  215. 8:16b
  216. 8:17define measure analyze design verify
  217. 8:22c
  218. 8:23demand measure analyze improve control
  219. 8:28d
  220. 8:29define measure analyze improve control
  221. 8:33leave your answers in the comments
  222. 8:35section below for a chance to be one of
  223. 8:37three people to win an amazon voucher
  224. 8:40now let's get back to lean six sigma
  225. 8:43lean six sigma is a methodology that
  226. 8:45focuses on eliminating problems removing
  227. 8:48inefficiencies and waste while improving
  228. 8:50the working conditions to ensure the
  229. 8:52customer's needs are better satisfied it
  230. 8:55combines the tools methods and
  231. 8:57principles of lean and six sigma
  232. 8:59we'll have another video detailing the
  233. 9:01process of lean six sigma very soon
  234. 9:04imagine you're the manager of a
  235. 9:06supermarket chain
  236. 9:07you've noticed that two things need your
  237. 9:09immediate attention
  238. 9:11the first issue is how to handle the
  239. 9:13different kinds of waste that you
  240. 9:14encounter at your supermarket
  241. 9:17the next one requires you to address the
  242. 9:19supply chain issues at the supermarket
  243. 9:21which are causing delays to the morning
  244. 9:23delivery of milk
  245. 9:25leading to customer dissatisfaction and
  246. 9:27attrition
  247. 9:28these problems can be solved by
  248. 9:30incorporating two of the most popular
  249. 9:32quality management methodologies in the
  250. 9:34world lean and six sigma
  251. 9:37one famous for its ability to handle
  252. 9:39waste and another known for process
  253. 9:41improvement
  254. 9:42but what if there was a methodology that
  255. 9:45combined the concepts of both six sigma
  256. 9:48and lean
  257. 9:49one that could solve all your issues
  258. 9:52well there is
  259. 9:53lean six sigma
  260. 9:55before we dive into lean six sigma let's
  261. 9:58take a closer look at its parent
  262. 10:00methodologies
  263. 10:01first off lean is a methodology that
  264. 10:04focuses on providing value to the
  265. 10:06customer
  266. 10:07eliminating waste
  267. 10:09continuous improvement
  268. 10:11reducing cycle time lean and six sigma
  269. 10:15both aim to handle waste
  270. 10:17but what is this waste
  271. 10:19waste is any step or action in the
  272. 10:21process that a user does not gain any
  273. 10:24value from in short things that users
  274. 10:27wouldn't want to pay for
  275. 10:29why would a consumer want to pay extra
  276. 10:31for the additional truck that was
  277. 10:32required to deliver milk to the
  278. 10:34supermarket just because the other one
  279. 10:36broke down
  280. 10:38this waste can be divided into eight
  281. 10:40categories let's have a look at each of
  282. 10:42them
  283. 10:42one transportation this waste refers to
  284. 10:46the excess movement of people tools
  285. 10:48inventory equipment and other components
  286. 10:51of a process than it is required
  287. 10:54two inventory
  288. 10:55this waste occurs due to having more
  289. 10:57products and materials than required
  290. 11:00this can cause damage and effects to
  291. 11:02products or materials greater time for
  292. 11:04completion inefficient allocation of
  293. 11:06capital and so on
  294. 11:09three
  295. 11:10motion
  296. 11:11this refers to the time and effort
  297. 11:13wasted due to unnecessary movement of
  298. 11:15people equipment or machinery
  299. 11:18this could be sitting through inventory
  300. 11:20double data entry and so on
  301. 11:234. waiting
  302. 11:25this can be time wasted waiting on
  303. 11:27information instructions materials or
  304. 11:30equipment
  305. 11:315. over-production
  306. 11:34this is the waste created due to
  307. 11:36producing more products than required
  308. 11:396.
  309. 11:41it refers to more work more components
  310. 11:44or more steps in a product or service
  311. 11:46than required
  312. 11:48seven defects
  313. 11:50this is the waste originating from a
  314. 11:52product or service that fails to meet
  315. 11:54customer expectations
  316. 11:568. skills
  317. 11:58this waste refers to the waste of human
  318. 12:00potential under utilizing capabilities
  319. 12:03and delegating tasks to people with
  320. 12:05inadequate training
  321. 12:07for years now many systems have emerged
  322. 12:09that use the lean methodology to
  323. 12:11identify and handle the different kinds
  324. 12:14of waste
  325. 12:15some of the more popular and effective
  326. 12:16ones are
  327. 12:18jit or just in time
  328. 12:205s and
  329. 12:22kanban the jit methodology focuses on
  330. 12:26reducing the amount of time the
  331. 12:27production system takes to provide an
  332. 12:29output and the response time from
  333. 12:31suppliers to customers
  334. 12:335s is another methodology that focuses
  335. 12:36on cleanliness in organization while
  336. 12:38improving profits and efficiency
  337. 12:41kanban is also another popular
  338. 12:43methodology to achieve lean
  339. 12:46it is a visual method to manage tasks
  340. 12:48and workflows
  341. 12:49kanban enables users visualize the
  342. 12:52workflow to identify issues in the
  343. 12:54process and fix them
  344. 12:56these methodologies help in optimizing
  345. 12:58the waste production and are often used
  346. 13:01together to maximize results
  347. 13:03so that's the first problem solved
  348. 13:06now let's have a look at how you can
  349. 13:08improve the supermarket supply chain
  350. 13:10efficiency
  351. 13:11for that let's have a look at the other
  352. 13:13part of lean six sigma six sigma
  353. 13:16six sigma is a set of tools and
  354. 13:18techniques that are used for process
  355. 13:20improvement and removing defects
  356. 13:22let's see how six sigma makes that
  357. 13:25possible
  358. 13:26six sigma has two major methodologies
  359. 13:29dmaic and dmadv
  360. 13:32you can learn more about these two
  361. 13:34methodologies by checking out our six
  362. 13:36sigma in nine minutes video by clicking
  363. 13:38on the top right corner
  364. 13:40let's have a closer look at dmaic since
  365. 13:43lean six sigma uses the dmaic
  366. 13:46methodology of six sigma dmaic is an
  367. 13:49acronym for define measure analyze
  368. 13:53improve control
  369. 13:55it is used to improve existing products
  370. 13:57and processes so that it can meet the
  371. 13:59customer's requirements
  372. 14:01in the define phase you determine what
  373. 14:03the goals of the project are
  374. 14:05in this case you want to reduce the
  375. 14:07amount of time taken to deliver milk
  376. 14:09from the warehouse to the supermarket so
  377. 14:12that it is stocked on the supermarket
  378. 14:13shelves before 8 30 in the morning
  379. 14:16in the measure phase you measure the
  380. 14:18performance of the current unaltered
  381. 14:20process
  382. 14:21the milk truck leaves at 7 30 a.m in the
  383. 14:23morning and can take one of three routes
  384. 14:26a b and c
  385. 14:29route a is currently the preferred one
  386. 14:31as it takes only 60 minutes to reach the
  387. 14:33supermarket compared to the routes b and
  388. 14:36c which takes 70 and 80 minutes
  389. 14:38respectively
  390. 14:40in the analyze phase you find out why
  391. 14:42the defects exist since routes b and c
  392. 14:45were school bus routes
  393. 14:47by reducing the starting time by one
  394. 14:49hour at 6 30 instead of 7 30 meant
  395. 14:52avoiding the traffic routes b and c now
  396. 14:54take 40 to 45 minutes to reach the
  397. 14:56supermarket route a still takes the milk
  398. 14:59truck one hour to get to the supermarket
  399. 15:01even when the truck leaves at 6 30 a.m
  400. 15:04in the improved phase performance can be
  401. 15:06improved by addressing and eliminating
  402. 15:08the root causes
  403. 15:10now that you've realized that advancing
  404. 15:12the milk pickup by an hour and changing
  405. 15:14the route to route b can save time you
  406. 15:17change the process accordingly
  407. 15:19providing your workers with ample time
  408. 15:21to stock the milk into the shelves
  409. 15:23before the morning rush
  410. 15:24and finally in the control phase you
  411. 15:28make regular adjustments to control new
  412. 15:30processes and future performance
  413. 15:32you continue to monitor the delivery
  414. 15:34times and try out alternate routes to
  415. 15:36continually improve the process and
  416. 15:38ensure even faster delivery
  417. 15:41this process change led to reduced man
  418. 15:44hours and cost enhanced sales and
  419. 15:47customer retention
  420. 15:48the lean six sigma methodology offers
  421. 15:50many such benefits to businesses
  422. 15:53let's take a look at some of them
  423. 15:55one increase in profits
  424. 15:57two standardized and simplified process
  425. 16:01three reduced errors
  426. 16:03four employee development
  427. 16:06five
  428. 16:07value to customers
  429. 16:08and that is lean six sigma for you
  430. 16:11six sigma is a set of tools and
  431. 16:13techniques that have helped several
  432. 16:14companies around the world achieve
  433. 16:16business success hi guys i'm raut from
  434. 16:18simply learn and let's get started with
  435. 16:20our introduction to six sigma now let's
  436. 16:22understand this better with an example
  437. 16:24here let's talk about how things were
  438. 16:26before six sigma was introduced here
  439. 16:28jenny and james are having a
  440. 16:29conversation with each other jenny is
  441. 16:31james's manager and she's not happy at
  442. 16:33all she says james is in a lot of
  443. 16:35trouble this is because she found out
  444. 16:37that the customers weren't happy with
  445. 16:39the organization's service and the
  446. 16:40operational costs were way too high and
  447. 16:43as manager james had to make sure that
  448. 16:45this did not happen now let's have a
  449. 16:47look at the same scenario in present day
  450. 16:48here we have jenny congratulating james
  451. 16:51she's very impressed with his work but
  452. 16:52james says it's all thanks to six sigma
  453. 16:55methodology so jenny asks she wants to
  454. 16:57know more about six sigma so to
  455. 16:59understand six sigma here's what you
  456. 17:01need to know firstly we'll have to
  457. 17:02understand what is six sigma what its
  458. 17:04advantages are some of its methodologies
  459. 17:07what are the different roles in a six
  460. 17:08sigma team what is lean what is a lean
  461. 17:11process and what is lean six sigma so
  462. 17:13now let's get started with understanding
  463. 17:15what exactly is six sigma the six sigma
  464. 17:17methodology makes sure to find as well
  465. 17:20as eliminate any sort of defect or
  466. 17:22variation that could be affecting your
  467. 17:24product service or process now this
  468. 17:26methodology is statistics based is data
  469. 17:28driven and focused on continuous
  470. 17:30improvement now this means that there's
  471. 17:32no end goal in the horizon there's
  472. 17:34always another goal to reach there are
  473. 17:36three core ideologies behind six sigma
  474. 17:39the first one states that for any
  475. 17:40business to be successful there's
  476. 17:42continuous efforts that are required so
  477. 17:44that you can achieve stable as well as
  478. 17:46predictable process results the second
  479. 17:48ideology states that in any business or
  480. 17:50manufacturing process there are certain
  481. 17:52characteristics that can be defined
  482. 17:54measured analyzed and controlled the
  483. 17:56final ideology says that along with the
  484. 17:58rest of the organization the top level
  485. 18:00management plays a very important role
  486. 18:02to making sure that there's sustained
  487. 18:04quality now let's talk about the
  488. 18:06advantages of six sigma six sigma can
  489. 18:09help produce a road map or a path
  490. 18:11through which you can easily find and
  491. 18:13reduce any sort of organizational risk
  492. 18:15and reduce the operational costs another
  493. 18:18advantage is that it helps improve the
  494. 18:20efficiency of the process and making
  495. 18:22sure that it works in a timely manner it
  496. 18:24decreases defects improves the overall
  497. 18:26tracking and monitoring process and
  498. 18:28ensures that the products are aligned
  499. 18:30with the company's policies it is also
  500. 18:32reported that it greatly helps improve
  501. 18:34customer as well as vendor satisfaction
  502. 18:36it helps improve the cash flow and
  503. 18:38ensures that the products are complying
  504. 18:40with the regulations of the organization
  505. 18:43now let me tell you about the process of
  506. 18:45six sigma now six sigma projects are of
  507. 18:47basically two methodologies the dma ic
  508. 18:50and the dma dv now let's talk about
  509. 18:52dmaic in detail that's short for define
  510. 18:56measure analyze improve and control this
  511. 18:59is one of the most commonly used
  512. 19:00methodologies in the world this is
  513. 19:02commonly used by companies when they
  514. 19:04have to fix or improve an already
  515. 19:06existing product or process that does
  516. 19:08not meet the company's standards now
  517. 19:10let's have a look at the process first
  518. 19:11phase is the define phase in this phase
  519. 19:14you define the problem that the
  520. 19:15customers are facing you find out where
  521. 19:17you can improve and you clearly
  522. 19:19understand what the customers require of
  523. 19:21you the second phase is the measure
  524. 19:23phase now in this phase you actually
  525. 19:25identify how well the process is doing
  526. 19:28in its current unaltered state in the
  527. 19:31analyze phase you process the data that
  528. 19:33you get from the measure phase and
  529. 19:34determine what exactly is the cause of
  530. 19:36the delay or variation in the improve
  531. 19:39phase you start by making small changes
  532. 19:41to the business process and make sure
  533. 19:43that the problem you identified earlier
  534. 19:45is being taken care of and finally in
  535. 19:47the control phase you control the new
  536. 19:49process so that it doesn't go wrong and
  537. 19:52use the same knowledge for future
  538. 19:53processes now let's have a look at dmadv
  539. 19:57this is short for define measure analyze
  540. 20:00design and verify now this is also
  541. 20:02commonly known as dfss or the design for
  542. 20:04six sigma now this is commonly used by
  543. 20:06companies around the world when they
  544. 20:08have a new product that needs to be
  545. 20:09created all the way from scratch in the
  546. 20:12first phase which is the define phase
  547. 20:14you define what the goal of the project
  548. 20:16is and what the customers require of you
  549. 20:18in the measure phase you measure as well
  550. 20:20as determine what the customer needs and
  551. 20:22how they respond to your products in the
  552. 20:25analyze phase you perform analyses to
  553. 20:27determine how you can improve your
  554. 20:28product or service so they can better
  555. 20:30serve your customers in the design phase
  556. 20:32you set up process details and make
  557. 20:35optimizations to the design to make sure
  558. 20:37your customer is satisfied and finally
  559. 20:39in the verify phase you check how well
  560. 20:41the design is working out and how well
  561. 20:43it meets the customer's needs now before
  562. 20:46we go on let's talk about how six sigma
  563. 20:48was used in reference to the earlier
  564. 20:50example the situation that james was
  565. 20:52facing a survey conducted by the
  566. 20:54organization james was working for
  567. 20:56indicated that the customers weren't
  568. 20:58very happy with the organization so they
  569. 21:00decided to fix that with the help of six
  570. 21:02sigma so they decided that the dmaic
  571. 21:04methodology would be best suited to
  572. 21:06solve their problem so let's have a look
  573. 21:08at what they did firstly in the define
  574. 21:10phase they used a tool called the voice
  575. 21:12of the customer this tool represented
  576. 21:14the needs as well as requirements of the
  577. 21:15customer this showed that the customers
  578. 21:17expected prompt delivery the correct
  579. 21:19product selection and a knowledgeable
  580. 21:21distribution team from the company and
  581. 21:23now on to the measure phase the company
  582. 21:25wanted to know why the customers didn't
  583. 21:27like them so they performed some data
  584. 21:29collection from there they found out
  585. 21:31that they took 56 percent longer than
  586. 21:34other companies to deliver their product
  587. 21:36so they decided to reduce the amount of
  588. 21:38time it takes between order entry and
  589. 21:40the delivery of the product and now in
  590. 21:42the analyze phase here they knew what
  591. 21:44the issue was but they wanted to know
  592. 21:46what exactly made their products
  593. 21:48delivery so slow why were the customers
  594. 21:50receiving the product so late then they
  595. 21:53performed some analysis their analysis
  596. 21:55showed the possible causes it could have
  597. 21:57been inaccurate sales plans issues with
  598. 21:59their safety stock issues with their
  599. 22:01vendors delivery performance and falling
  600. 22:03behind on the manufacturing schedule
  601. 22:05further analysis also indicated that
  602. 22:07most of their sales almost 80 percent
  603. 22:10came from 30 of their products the issue
  604. 22:12was that they didn't have enough safety
  605. 22:14stock to satisfy the customers who
  606. 22:16required that 30 of products and now on
  607. 22:19to the improved phase so now that they
  608. 22:20knew what was causing their problem they
  609. 22:23wanted to solve it they began to have
  610. 22:24monthly reviews and tried to make sure
  611. 22:27that their in-demand products stayed in
  612. 22:29demand another thing that they wanted to
  613. 22:31focus on was to make sure that they
  614. 22:33could order and provide the customer
  615. 22:34with the products that they wanted and
  616. 22:36finally onto the control phase they
  617. 22:38began to set up plans so that they could
  618. 22:40monitor the sales of that 30 of products
  619. 22:43that were selling the most each year
  620. 22:44they would review how well a product was
  621. 22:46selling and replace it if it had fallen
  622. 22:48out of favor now let me tell you what a
  623. 22:50six sigma team consists of let's talk
  624. 22:53about the roles in a six sigma team
  625. 22:55first up is level seven now these are
  626. 22:57individuals who are at the novice level
  627. 23:00now these individuals don't know in
  628. 23:02great detail about what the project is
  629. 23:04but they have a basic understanding of
  630. 23:06the principles and the methodology
  631. 23:08behind the program now they usually
  632. 23:10support with smaller projects and with
  633. 23:12smaller issues but these individuals
  634. 23:14found the foundation for the people who
  635. 23:16decide where the program is going and
  636. 23:18now we're at level six now these are
  637. 23:21individuals who have a yellow belt
  638. 23:22certification now they are core members
  639. 23:24of the six sigma team who have an
  640. 23:26understanding of how the basic metrics
  641. 23:28work and how they can perform some sort
  642. 23:30of improvement now they have their own
  643. 23:32areas of expertise and they're required
  644. 23:34to determine certain processes that need
  645. 23:36to improve at the same time they're also
  646. 23:39in charge of smaller improvement
  647. 23:40projects now level five these are people
  648. 23:43who have a green belt certification now
  649. 23:45these individuals are usually part-time
  650. 23:47professionals who have a number of
  651. 23:48different duties to fulfill they focus
  652. 23:50on smaller six sigma projects they are
  653. 23:53usually involved with gathering data
  654. 23:54performing some sort of experiment and
  655. 23:56analyzing information they also assist
  656. 23:59with black belt projects and now we're
  657. 24:01at level four these are individuals who
  658. 24:03have a black belt certification they're
  659. 24:05usually team leaders of a six sigma
  660. 24:07project they complete four to six
  661. 24:09projects a year and are experts in the
  662. 24:11principles methodologies and lean
  663. 24:13concepts thanks to their understanding
  664. 24:15of statistical experimental design they
  665. 24:17can also understand the hidden reasons
  666. 24:19behind why a particular product failed
  667. 24:21and now we're at level three these are
  668. 24:24individuals who have a master black belt
  669. 24:26certification now these are individuals
  670. 24:28who are experts when it comes to
  671. 24:29resources the practices and the
  672. 24:31methodologies that are employed in six
  673. 24:33sigma their main emphasis is to coach
  674. 24:35train and certify black belts they also
  675. 24:38are involved with other six sigma
  676. 24:40leaders to ensure a company's goals are
  677. 24:42met now level two these individuals are
  678. 24:45called champions so they work really
  679. 24:47closely with the executives and usually
  680. 24:49have a role like a senior or a middle
  681. 24:52executive level role they also have a
  682. 24:54clear understanding of what exactly is
  683. 24:56the company's vision and mission they
  684. 24:58also understand metrics so that they can
  685. 25:00set up a six sigma project that lines up
  686. 25:02with the company's goals they're
  687. 25:03responsible for removing any sort of
  688. 25:06roadblock that could hamper the success
  689. 25:07of a project and finally we're at level
  690. 25:10one these are the executives now these
  691. 25:13individuals represent the highest level
  692. 25:15when it comes to a six sigma team now
  693. 25:16they have training as well as experience
  694. 25:18through which they can set up six sigma
  695. 25:20projects that clearly line up with the
  696. 25:22company's goals their main emphasis is
  697. 25:25to ensure that the project is able to
  698. 25:27add value to the organization and at the
  699. 25:29end of the day is successful now this is
  700. 25:31when jenny interjects she wants to know
  701. 25:33about lean john tells her that lean just
  702. 25:36like six sigma is another methodology so
  703. 25:38what exactly is lean now lean is a
  704. 25:41methodology that has a very important
  705. 25:44ideology to make sure that there's
  706. 25:46continuous optimization of the processes
  707. 25:48and there's an elimination of waste so
  708. 25:51what's waste so waste is basically any
  709. 25:53part of the process that the customer
  710. 25:56doesn't want to pay for it is a process
  711. 25:58that does not add any value to the
  712. 26:00customer now coming back to lean here
  713. 26:02are some of its characteristics whenever
  714. 26:04decisions are being made in a lean team
  715. 26:06the main emphasis is to understand how
  716. 26:08it exactly adds value to the customer
  717. 26:11every member in a lean team has a clear
  718. 26:13understanding of what exactly are the
  719. 26:15goals of the organization it also
  720. 26:17encourages employees to push for further
  721. 26:19success even if the organization is in a
  722. 26:21good place or is already doing well
  723. 26:23there's also an emphasis on
  724. 26:24cross-functional collaboration and
  725. 26:26communication lean focuses on answering
  726. 26:29the difficult question or the complex
  727. 26:31ones rather than employing short-term
  728. 26:33fixes and with lean you can easily
  729. 26:35prepare for issues that can come up in
  730. 26:38the future or improvise in unexpected
  731. 26:40circumstances so let's talk about how
  732. 26:42lean and six sigma are different from
  733. 26:44one another the lean methodology aims to
  734. 26:47reduce waste it does so by analyzing the
  735. 26:50workflow it also emphasizes on
  736. 26:52minimizing resource usage and improving
  737. 26:55customer value now let's talk about six
  738. 26:57sigma the aim of six sigma is to provide
  739. 27:00near-perfect results it wants to reduce
  740. 27:02costs and improve customer satisfaction
  741. 27:05basically both of them are moving
  742. 27:06towards the same goal to reduce the
  743. 27:08amount of waste and to create efficient
  744. 27:10processes now let's talk about the
  745. 27:12process of lean now there are five
  746. 27:14different steps let's start with the
  747. 27:16first one identifying value you need to
  748. 27:18identify value by determining what
  749. 27:20exactly is the problem you're trying to
  750. 27:22solve for the customer the second step
  751. 27:24is to map your value stream you need to
  752. 27:26map the workflow of your company you
  753. 27:28need to focus on the different actions
  754. 27:30and the people that are involved with
  755. 27:32the process you need to be able to
  756. 27:34identify which parts of the process are
  757. 27:36able to add value and the ones that
  758. 27:38don't the third step is to create a flow
  759. 27:40you need to break up your work into
  760. 27:42smaller silos and visualize the workflow
  761. 27:44so that you can easily identify problems
  762. 27:47that might show up later the next step
  763. 27:49is to establish pull you need to set up
  764. 27:51a system through which products are
  765. 27:53created only when there is a demand or a
  766. 27:55requirement for it through this you can
  767. 27:57optimize resource capacity and finally
  768. 27:59we're at the fifth step which is
  769. 28:00continuous improvement you need to
  770. 28:02ensure all your employees at all levels
  771. 28:05are involved in the continuous
  772. 28:07improvement of the process so what
  773. 28:09exactly is lean six sigma what if you
  774. 28:11could combine the best of both worlds
  775. 28:14the combination of six sigma and lean
  776. 28:16methodology led to the creation of lean
  777. 28:19six sigma lean six sigma is a
  778. 28:21methodology that aims to solve problems
  779. 28:23removes any form of waste or
  780. 28:25inefficiency and improving the working
  781. 28:27conditions of employees to make sure
  782. 28:29that they can serve the customers better
  783. 28:31now this is a combination of the tools
  784. 28:34methods and principles that are employed
  785. 28:36in lean and six sigma let's talk about
  786. 28:38some of its advantages it aims to
  787. 28:40provide customers with a better
  788. 28:41experience by streamlining the process
  789. 28:43with efficient power flows it aims to
  790. 28:46drive higher results it can reduce cost
  791. 28:48remove waste and prevent effects it can
  792. 28:50help the organization handle day-to-day
  793. 28:52problems the decreased lead times help
  794. 28:55increase capacity and profitability and
  795. 28:58finally it helps with people development
  796. 29:00and improving the morale of the
  797. 29:02organization
  798. 29:03this lesson provides an overview of the
  799. 29:05certified six sigma greenbelt or cssgb
  800. 29:09course
  801. 29:10a process is a series of steps designed
  802. 29:13to produce a product and or service
  803. 29:16according to the requirement of the
  804. 29:17customer
  805. 29:18a process mainly consists of four parts
  806. 29:21input process steps output and feedback
  807. 29:26input is something put into a process or
  808. 29:28expended in its operation to achieve an
  809. 29:31output or a result
  810. 29:33for example man material machine and
  811. 29:36management
  812. 29:37output is the final product delivered to
  813. 29:40an internal or external customer
  814. 29:42for example product or services
  815. 29:45it is important to understand that if
  816. 29:47the output of a process is an input for
  817. 29:49another process the latter process is
  818. 29:52the internal customer
  819. 29:54each input can be classified as
  820. 29:56controllable represented as c
  821. 29:59non-controllable represented as nc
  822. 30:03noise represented as n
  823. 30:06and critical represented as x
  824. 30:09the most important aspect of the process
  825. 30:11is the feedback
  826. 30:13as can be inferred from the image any
  827. 30:16change in the inputs causes change in
  828. 30:18the output
  829. 30:19therefore y equals f of x
  830. 30:22feedback helps in process control
  831. 30:25because it suggests changes to the
  832. 30:27inputs
  833. 30:28let us learn about the process of six
  834. 30:30sigma in the next screen
  835. 30:34let us understand how six sigma works in
  836. 30:37this screen
  837. 30:38six sigma is successful because of the
  838. 30:40following reasons
  839. 30:42six sigma is a management strategy it
  840. 30:45creates an environment where the
  841. 30:47management supports six sigma as a
  842. 30:49business strategy and not as a
  843. 30:51standalone approach or a program to
  844. 30:54satisfy some public relations need
  845. 30:56six sigma mainly emphasizes the dmacc
  846. 30:59method of problem solving
  847. 31:01focused teams are assigned well-defined
  848. 31:03projects that directly influence the
  849. 31:06organization's bottom line with customer
  850. 31:08satisfaction and increased quality being
  851. 31:11byproducts
  852. 31:13six sigma also requires extensive use of
  853. 31:15statistical methods
  854. 31:17the next screen will focus on some key
  855. 31:19terms used in six sigma
  856. 31:23let us look at the sigma level chart in
  857. 31:26this screen
  858. 31:27as discussed earlier the six sigma
  859. 31:29quality means 3.4 defects in 1 million
  860. 31:32opportunities or process with a
  861. 31:3699.99966 percent yield
  862. 31:38the sigma level chart given on the
  863. 31:40screen shows the values for other sigma
  864. 31:43levels
  865. 31:44please take a look at the values
  866. 31:45carefully
  867. 31:46let us understand the benefits of six
  868. 31:48sigma in the next screen
  869. 31:51the organizational benefits of six sigma
  870. 31:53are as follows
  871. 31:55a six sigma process eliminates the root
  872. 31:58cause of problems and defects in a
  873. 32:00process
  874. 32:01sometimes the solution is creating
  875. 32:03robust products and services that
  876. 32:05mitigate the impact of a variable input
  877. 32:08or output on a customer's experience for
  878. 32:10example many electrical utility systems
  879. 32:13have voltage variability up to and
  880. 32:16sometimes exceeding a 10 percent
  881. 32:18deviation from nominal value
  882. 32:20thus most electrical products are built
  883. 32:23to tolerate the variability
  884. 32:25drawing more amperage without damage to
  885. 32:28any components or the unit itself
  886. 32:31using six sigma reduces variation in a
  887. 32:34process and thereby reduces waste in a
  888. 32:37process
  889. 32:38it ensures customer satisfaction and
  890. 32:40provides process standardization
  891. 32:43rework is substantially reduced because
  892. 32:46one gets it right the very first time
  893. 32:49further six sigma addresses the key
  894. 32:51business requirement
  895. 32:53six sigma can also be used by
  896. 32:55organizations to gain advantage and
  897. 32:57become world leaders in their respective
  898. 32:59fields
  899. 33:00ultimately the whole six sigma process
  900. 33:03is to satisfy customers and achieve
  901. 33:05organizational goals
  902. 33:07in the next screen let us understand six
  903. 33:09sigma and quality
  904. 33:14taking a process to six sigma level
  905. 33:16ensures that the quality of the product
  906. 33:18is maintained
  907. 33:19the primary goal of improved quality is
  908. 33:22increased profits for the organization
  909. 33:25in very simple terms quality is defined
  910. 33:27as the degree of excellence of a product
  911. 33:29or a service provided to the customer
  912. 33:32it is conformance to customer
  913. 33:34requirement
  914. 33:35if the customer is satisfied with the
  915. 33:37product or service then the product or
  916. 33:39service is of the required quality
  917. 33:41let us look at the history of quality in
  918. 33:44the next screen in the mid 1930s
  919. 33:46statistical process control spc was
  920. 33:50developed by walter shoehart and used
  921. 33:52extensively during world war ii to
  922. 33:54quickly expand the us's industrial
  923. 33:57capabilities
  924. 33:58spc is the application of statistical
  925. 34:01techniques to control any process
  926. 34:04walter shoehart's work on the common
  927. 34:06cause of variation and special cause of
  928. 34:08variation assignable has been used
  929. 34:11proactively in all six sigma projects
  930. 34:14the approach to quality has varied from
  931. 34:17time to time
  932. 34:18in the 1960s there were quality circles
  933. 34:21which originated in japan
  934. 34:23it was started by kaoru ishikawa
  935. 34:26quality circles were self-improvement
  936. 34:28groups composed of small number of
  937. 34:30employees belonging to a single
  938. 34:32department
  939. 34:33quality circles brought in improvements
  940. 34:35with little or no help from the top
  941. 34:37management
  942. 34:38in 1987 iso 9000 was introduced
  943. 34:43iso stands for international
  944. 34:45organization for standardization
  945. 34:47iso 9000 is a set of international
  946. 34:50standards on quality management and
  947. 34:52quality assurance to help organizations
  948. 34:55implement quality management systems
  949. 34:57iso 9000 is still in effect
  950. 35:01baldrige award now known as the malcolm
  951. 35:04baldrige national quality award was
  952. 35:06developed by the u s congress in 1987 to
  953. 35:10raise awareness of quality management
  954. 35:12systems as well as recognize and award u
  955. 35:15s companies that have successfully
  956. 35:17implemented quality management systems
  957. 35:20in 1988 another quality approach was
  958. 35:23developed known as benchmarking
  959. 35:26in this approach an organization
  960. 35:28measures its performance against the
  961. 35:30best organizations in its field
  962. 35:32determines how such performance levels
  963. 35:34were achieved and the information is
  964. 35:37used by the organization to improve
  965. 35:39itself
  966. 35:40then in the 1990s there was the balanced
  967. 35:43scorecard approach
  968. 35:45it is a management tool that helps
  969. 35:46managers of all levels to monitor their
  970. 35:49results in their key areas so that one
  971. 35:52metric is not optimized while another is
  972. 35:54ignored
  973. 35:56during the year 1996 through 1997 an
  974. 36:00approach known as re-engineering was
  975. 36:02developed
  976. 36:03this approach involved the restructuring
  977. 36:05of an entire organization and its
  978. 36:08processes
  979. 36:09integrating various functional tasks
  980. 36:11into cross-functional processes is one
  981. 36:14of the examples of re-engineering
  982. 36:17in the next screen let us find out about
  983. 36:19the quality gurus and their contribution
  984. 36:22to the field of quality
  985. 36:25let us focus on six sigma and the
  986. 36:27business system in this screen
  987. 36:30business systems are designed to
  988. 36:32implement a process or a set of
  989. 36:34processes
  990. 36:35a business system ensures that process
  991. 36:38inputs are at the right place and at the
  992. 36:40right time so that each step of the
  993. 36:42process has the resource it needs
  994. 36:46a business system design should be
  995. 36:48responsible for collecting and analyzing
  996. 36:50data so that continual improvement of
  997. 36:53its processes products and services is
  998. 36:56ensured
  999. 36:57a business system has processes sub
  1000. 37:00processes and steps as its subsets
  1001. 37:04human resources manufacturing and
  1002. 37:06marketing are some examples of processes
  1003. 37:09in a business system
  1004. 37:12six sigma improves a business system by
  1005. 37:15continuously removing the defects in its
  1006. 37:18processes and also by sustaining the
  1007. 37:20changes
  1008. 37:21a defective item is any product or
  1009. 37:23service that a customer would reject
  1010. 37:26a customer can be the user of the
  1011. 37:28ultimate product or service or can be
  1012. 37:31the next process downstream in the
  1013. 37:33business system
  1014. 37:35let us learn about six sigma projects
  1015. 37:37and organizational goals in the
  1016. 37:39following screen
  1017. 37:43let us understand the structure of the
  1018. 37:45six sigma team in this screen
  1019. 37:47there are totally five levels in the six
  1020. 37:50sigma screen
  1021. 37:51the first level consists of the top
  1022. 37:53executives of the organization
  1023. 37:55these people lead change and provide
  1024. 37:57direction as they own the vision of the
  1025. 37:59organization
  1026. 38:00for any improvement initiative to work
  1027. 38:03it is important that top management of
  1028. 38:05the organization be actively involved in
  1029. 38:08its propagation
  1030. 38:09the top executives own the six sigma
  1031. 38:12initiatives
  1032. 38:13next in the level are six sigma
  1033. 38:15champions
  1034. 38:16they identify and scope projects develop
  1035. 38:19deployment and strategy and support
  1036. 38:22cultural change
  1037. 38:23they also identify and coach master
  1038. 38:26black belts
  1039. 38:27three to four master black belts work
  1040. 38:29under every champion
  1041. 38:31six sigma master black belts train and
  1042. 38:34coach black belts green belts and
  1043. 38:36various functional leaders of the
  1044. 38:38organization
  1045. 38:40they usually have at least three to four
  1046. 38:41black belts under them
  1047. 38:44the fourth level in six sigma structure
  1048. 38:46is six sigma black belts
  1049. 38:48they apply strategies to specific
  1050. 38:50projects and lead and direct teams to
  1051. 38:53execute projects
  1052. 38:55finally there are six sigma green belts
  1053. 38:58they support the black belt employees by
  1054. 39:01participating in project teams
  1055. 39:03green belts play a dual role
  1056. 39:06they work on the project and perform
  1057. 39:08day-to-day jobs related to their work
  1058. 39:10area
  1059. 39:11in the next screen we will understand
  1060. 39:13the drivers and metrics of
  1061. 39:15organizational strategy
  1062. 39:18while financial accounting is useful to
  1063. 39:21track physical assets the balanced
  1064. 39:23scorecard or bsc
  1065. 39:25offers a more holistic approach to
  1066. 39:27strategy implementation and performance
  1067. 39:30measurement by taking into account
  1068. 39:32perspectives other than the financial
  1069. 39:34one
  1070. 39:35for an organization traditional
  1071. 39:37strategic activities that concentrate
  1072. 39:39only on financial metrics are not
  1073. 39:41sufficient to predict future performance
  1074. 39:44they are not sufficient to implement and
  1075. 39:46control the strategic plan either
  1076. 39:49bsc translates the organizational
  1077. 39:51strategy into actionable objectives that
  1078. 39:54can be met on an everyday basis and
  1079. 39:57provides a framework for performance
  1080. 39:59measurement
  1081. 40:00the balanced scorecard helps clarify the
  1082. 40:03organizational vision and mission to
  1083. 40:05workable action items to be carried out
  1084. 40:07and measured it also provides feedback
  1085. 40:10on both internal business processes and
  1086. 40:13external outcomes
  1087. 40:14by doing so it enables continuous
  1088. 40:17improvement in strategic performance
  1089. 40:19toward achieving organizational goals
  1090. 40:22the balanced scorecard achieves all this
  1091. 40:25by integrating the organizational
  1092. 40:26strategy with a limited number of key
  1093. 40:29metrics from four major areas of
  1094. 40:31performance
  1095. 40:32finance customer relations internal
  1096. 40:35processes and learning and growth
  1097. 40:38many organizations in the world use
  1098. 40:41balanced scorecard approaches and the
  1099. 40:43number is increasing every day
  1100. 40:46in the next screen we will describe the
  1101. 40:48balanced scorecard framework
  1102. 40:50we will learn about developing a
  1103. 40:52balanced scorecard in this screen
  1104. 40:55while applying the balanced scorecard in
  1105. 40:57an organization care must be taken to
  1106. 40:59account for interactions between
  1107. 41:01different perspectives or strategic
  1108. 41:03business units and avoid optimizing the
  1109. 41:06results of one at the expense of another
  1110. 41:09to outline the strategy a top-down
  1111. 41:12approach is followed by determining the
  1112. 41:14strategic objectives measures targets
  1113. 41:16and initiatives for each perspective the
  1114. 41:20strategic objectives refer to the
  1115. 41:22strategy to be achieved in that
  1116. 41:24perspective
  1117. 41:25three or four leading objectives are
  1118. 41:27agreed upon the progress towards
  1119. 41:30strategic objectives is assessed using
  1120. 41:32specific measures these measures should
  1121. 41:35be closely related to the actual
  1122. 41:37performance drivers
  1123. 41:38this enables effectively evaluating
  1124. 41:40progress
  1125. 41:42high level metrics are linked to lower
  1126. 41:44level operational measures
  1127. 41:46the target values for each measure are
  1128. 41:48set the initiatives required to achieve
  1129. 41:50the target value are identified
  1130. 41:53as already mentioned this exercise is
  1131. 41:56carried out for all the perspectives
  1132. 41:59finally the scorecard is integrated into
  1133. 42:01the management system
  1134. 42:03in the next screen let us understand the
  1135. 42:05change in the approach to the balance
  1136. 42:07score card from the four box model of
  1137. 42:09bsc to strategy maps
  1138. 42:14in earlier approaches to the balanced
  1139. 42:16scorecard the perspectives were
  1140. 42:18presented in a four box model
  1141. 42:21this kind of scorecard was more a
  1142. 42:23comprehensive glance at the key
  1143. 42:25performance indicators or metrics in
  1144. 42:27different perspectives
  1145. 42:29however the key performance indicators
  1146. 42:31or metrics of different perspectives
  1147. 42:33were viewed independent of each other
  1148. 42:36which led to a silo based approach and
  1149. 42:38lack of integration
  1150. 42:40however modern scorecards place the
  1151. 42:43focus on the interrelations between the
  1152. 42:45objectives and metrics of different
  1153. 42:47perspectives and how they support each
  1154. 42:49other
  1155. 42:50a well-designed balanced scorecard
  1156. 42:53recognizes the influence of one
  1157. 42:55perspective on another and the effect of
  1158. 42:57these interactions on organizational
  1159. 43:00strategy
  1160. 43:01to achieve the objectives in one
  1161. 43:03perspective it is necessary to achieve
  1162. 43:06the objectives in another perspective
  1163. 43:08in short the four perspectives form a
  1164. 43:11chain of cause and effect relationships
  1165. 43:14a map of interlinked objectives from
  1166. 43:16each perspective is created
  1167. 43:19these objectives represents the
  1168. 43:21performance drivers which determine the
  1169. 43:23effectiveness of strategy implementation
  1170. 43:26this is called a strategy map
  1171. 43:29the function of a strategy map is to
  1172. 43:31outline what the organization wants to
  1173. 43:33accomplish and how it plans to
  1174. 43:35accomplish it
  1175. 43:36the strategy map is one page view of how
  1176. 43:39the organization can create value
  1177. 43:42for example financial success is
  1178. 43:44dependent on giving customers what they
  1179. 43:47want which in turn depends on the
  1180. 43:49internal processes and learning and
  1181. 43:51growth at an individual level
  1182. 43:54in the next screen we will look at the
  1183. 43:56impact of the balanced scorecard on the
  1184. 43:58organization
  1185. 44:01the balance scorecard and strategy map
  1186. 44:03force managers to consider cause and
  1187. 44:05effect relationships which leads to
  1188. 44:08better identification of key drivers and
  1189. 44:10a more rounded approach to strategic
  1190. 44:12planning the bsc enables the
  1191. 44:15organization to improve in the following
  1192. 44:17ways
  1193. 44:18being a one-page document a strategy map
  1194. 44:21can easily be communicated and
  1195. 44:23facilitates understanding at all levels
  1196. 44:25of the organization
  1197. 44:27an organization is successful in meeting
  1198. 44:29its objectives only when everyone
  1199. 44:32understands the strategy
  1200. 44:34the balance scorecard also forces an
  1201. 44:36organization to measure what really
  1202. 44:38matters and manage information better so
  1203. 44:41that quality of decision making is
  1204. 44:43higher
  1205. 44:44creating performance reports against a
  1206. 44:46balanced scorecard allows for a
  1207. 44:48structured approach to reporting
  1208. 44:50progress
  1209. 44:51it also enables organizations to create
  1210. 44:53reports and dashboards to communicate
  1211. 44:56performance transparently and
  1212. 44:58meaningfully
  1213. 44:59as expected a balanced scorecard helps
  1214. 45:01an organization to better align itself
  1215. 45:04and its processes to the strategic goals
  1216. 45:06outlined in the bsc
  1217. 45:09the overall objectives of the bsc can be
  1218. 45:11cascaded into each business unit to
  1219. 45:14enable that unit to work toward the
  1220. 45:16common organizational goal
  1221. 45:19all the activities of the organization
  1222. 45:21such as budgeting or risk management are
  1223. 45:23automatically aligned to the strategic
  1224. 45:25objectives
  1225. 45:27to conclude the balance scorecard is a
  1226. 45:29simple and powerful tool that when
  1227. 45:32implemented correctly equips an
  1228. 45:34organization to perform better
  1229. 45:37let us proceed to the next topic of this
  1230. 45:39lesson in the following screen
  1231. 45:41in this topic we will look at what lean
  1232. 45:44is and how lean is applied to a process
  1233. 45:48let us start with the lean concepts in
  1234. 45:50the next screen
  1235. 45:51let us look at the process issues in
  1236. 45:54this screen
  1237. 45:55lean focuses on three major issues in a
  1238. 45:58process known by their japanese names
  1239. 46:01muda mura and marie
  1240. 46:04muda refers to non-value-adding work
  1241. 46:06mura represents unevenness and marie
  1242. 46:09represents overburden
  1243. 46:11together they represent the key aspects
  1244. 46:14in lean
  1245. 46:15let us look at the types of waste in the
  1246. 46:17next screen
  1247. 46:22there are seven types of muda or waste
  1248. 46:25as per lean principles
  1249. 46:27let us understand these seven types of
  1250. 46:29muta
  1251. 46:30overproduction
  1252. 46:32this refers to producing more than is
  1253. 46:34required
  1254. 46:35for example a customer needed 10
  1255. 46:38products and 12 were delivered
  1256. 46:40inventory in simple words this refers to
  1257. 46:44stock
  1258. 46:45the term inventory includes finished
  1259. 46:47goods semi-finished goods raw materials
  1260. 46:50supplies kept in waiting and some of the
  1261. 46:53work in progress for example test
  1262. 46:56scripts waiting to be executed by the
  1263. 46:58testing team
  1264. 46:59defects repairs rejects
  1265. 47:01any product or service deemed unusable
  1266. 47:04by the customer or any effort to make it
  1267. 47:06usable to the original customer or a new
  1268. 47:08customer for example errors found in the
  1269. 47:11source code of a payroll module by
  1270. 47:14quality control team
  1271. 47:15motion
  1272. 47:16a waste due to poor ergonomics of the
  1273. 47:18workplace for example finance and
  1274. 47:21account teams sit on the first floor but
  1275. 47:23invoices to customers are printed on the
  1276. 47:26ground floor causing unnecessary
  1277. 47:28personnel movement
  1278. 47:30over processing
  1279. 47:32additional process on a product or
  1280. 47:34service to remove unnecessary attribute
  1281. 47:36or feature is over processing
  1282. 47:39for example a customer needs a bottle
  1283. 47:41and you deliver a bottle with extra
  1284. 47:43plastic casing a customer needs abec3
  1285. 47:47bearing and your process is tuned to
  1286. 47:49produce more precise abec 7 bearings
  1287. 47:53taking more time for something the
  1288. 47:54customer doesn't need
  1289. 47:56waiting when a part waits for processing
  1290. 47:59or the operator waits for work the
  1291. 48:01wastage of waiting occurs for example
  1292. 48:04improper scheduling of staff members
  1293. 48:06transport when the product moves
  1294. 48:09unnecessarily in the process without
  1295. 48:11adding value
  1296. 48:13for example a product is finished and
  1297. 48:15yet it travels 10 kilometers to the
  1298. 48:17warehouse before it gets shipped to the
  1299. 48:19customer
  1300. 48:20another example an electronic form is
  1301. 48:23transferred to 12 people some of them
  1302. 48:25seeing the form more than once that is
  1303. 48:28the form is traveling over the same
  1304. 48:30space multiple times
  1305. 48:32next we will look at lean wastes other
  1306. 48:34than the seven types of waste discussed
  1307. 48:36some lean experts talk about additional
  1308. 48:39areas of waste
  1309. 48:41under utilized skills
  1310. 48:43skills are underutilized when the
  1311. 48:45workforce has capabilities that are not
  1312. 48:47being fully used toward productive
  1313. 48:49efforts
  1314. 48:50people are assigned to jobs in which
  1315. 48:52they do not fit
  1316. 48:54underperforming processes
  1317. 48:56automation of poorly performing process
  1318. 48:59improving a process that should be
  1319. 49:01eliminated if possible for example the
  1320. 49:04product returns department or product
  1321. 49:06discounts process
  1322. 49:07a symmetry in processes that should be
  1323. 49:10eliminated for example two signatures to
  1324. 49:12approve a cost reduction and six
  1325. 49:14signatures to reverse a cost reduction
  1326. 49:17that created higher costs in other areas
  1327. 49:20in the next screen we will look at an
  1328. 49:22exercise on identifying the waste type
  1329. 49:25we will cover each step of the lean
  1330. 49:27process in the next few screens in this
  1331. 49:30screen we will learn about the first
  1332. 49:31step identify value to implement lean to
  1333. 49:35a process
  1334. 49:36it is important to find out what the
  1335. 49:38customer wants
  1336. 49:40once this is done the process should be
  1337. 49:42evaluated to identify what it needs to
  1338. 49:45possess to meet customer requirements
  1339. 49:48the next screen will focus on the next
  1340. 49:51step of the lean process
  1341. 49:53value stream mapping
  1342. 49:56in this screen we will discuss the
  1343. 49:58differences between push and pull
  1344. 50:00processes
  1345. 50:01an organization can adopt either of
  1346. 50:03these processes depending on the
  1347. 50:05requirement
  1348. 50:07contrary to a pull process in a push
  1349. 50:09process the first step is to forecast
  1350. 50:12the demand for a product or service
  1351. 50:15the production line then begins to fill
  1352. 50:17this demand and produced parts are
  1353. 50:19stocked in anticipation of customer
  1354. 50:21demand
  1355. 50:22for example a garments manufacturer
  1356. 50:25produces 200 shirts based on expected
  1357. 50:27demand and then waits for customer
  1358. 50:29orders for them
  1359. 50:31note that the demand is expected and not
  1360. 50:33actual
  1361. 50:34discounts offered to customers by big
  1362. 50:37retailers are examples of the push
  1363. 50:39process
  1364. 50:40if the garment company adopts a pull
  1365. 50:42process instead it would start making
  1366. 50:45the shirts only after receiving a
  1367. 50:47confirmed demand from customers
  1368. 50:50note that although the pull approach
  1369. 50:52seems better it is not applicable to all
  1370. 50:54situations for example a pharmacy uses a
  1371. 50:58push process
  1372. 50:59in the next screen we will learn about
  1373. 51:01theory of constraints
  1374. 51:04let us look at an example for the toc
  1375. 51:07methodology in this screen
  1376. 51:09the three sub processes in the packing
  1377. 51:12process are coding or printing filling
  1378. 51:15and sealing
  1379. 51:16the data for the three sub processes are
  1380. 51:19observed and collected as number of
  1381. 51:21units produced in an hour
  1382. 51:23the data is as follows
  1383. 51:25coding or printing is 900 units per hour
  1384. 51:29filling is 720 units per hour and
  1385. 51:32ceiling is 780 units per hour
  1386. 51:35how can you implement the toc
  1387. 51:37methodology in this example
  1388. 51:40let us build the toc map for this
  1389. 51:42example
  1390. 51:43the first step in the toc methodology is
  1391. 51:46to identify the constraint
  1392. 51:48looking at the data the output per hour
  1393. 51:51from the filling process is 720
  1394. 51:54this is the constraint in the system
  1395. 51:57in the second step the constraint is
  1396. 51:59exploited by analyzing the performance
  1397. 52:02using data
  1398. 52:03to break the constraint a repair and
  1399. 52:05maintenance personnel can be assigned to
  1400. 52:07maintain the filling machine on a daily
  1401. 52:09basis
  1402. 52:11in the third step the other fixes in the
  1403. 52:13repair and maintenance function are made
  1404. 52:15as subordinate decisions to the one
  1405. 52:17taken in step two
  1406. 52:19in this example carry out the
  1407. 52:21maintenance of the filling machine
  1408. 52:23in the fourth step the constraint is
  1409. 52:25elevated by implementing the decisions
  1410. 52:28in this example remove the damages from
  1411. 52:30the filling machine the next step is to
  1412. 52:33go back to step one and identify the
  1413. 52:35next system constraint
  1414. 52:37as per the data collected after
  1415. 52:39implementation of the first cycle of the
  1416. 52:41toc
  1417. 52:43ceiling can be identified as the next
  1418. 52:45system constraint
  1419. 52:48let us now analyze the data before and
  1420. 52:50after toc implementation in this example
  1421. 52:54the number of units produced per hour
  1422. 52:56before implementing the toc encoding or
  1423. 52:58printing process was 900 units filling
  1424. 53:02process was 720 units and sealing
  1425. 53:05process was 780 units
  1426. 53:08after implementing the toc the number of
  1427. 53:10units produced per hour for the filling
  1428. 53:12process increased to 840 from 720 units
  1429. 53:19let us proceed to the next topic of this
  1430. 53:21lesson
  1431. 53:22in this topic we will discuss the
  1432. 53:24concepts in design for six sigma or dfss
  1433. 53:28let us first understand dfss in the next
  1434. 53:32screen
  1435. 53:34dfss or design for six sigma is a
  1436. 53:38business process methodology that
  1437. 53:40ensures that any new product or service
  1438. 53:43meets customer requirements and the
  1439. 53:45process for that product or service is
  1440. 53:47already at six sigma level
  1441. 53:50dfss uses tools such as quality function
  1442. 53:53deployment or qfd and failure mode and
  1443. 53:57effects analysis or fmea
  1444. 54:01dfss can help a business system to
  1445. 54:04introduce an entirely new product or
  1446. 54:06service for the customer
  1447. 54:08it can also be used to introduce a new
  1448. 54:11category of product or service for the
  1449. 54:13business system
  1450. 54:14for example an fmcg company plans to
  1451. 54:18make a new brand of hair oil a type of
  1452. 54:20product already in the market
  1453. 54:23dfss also improves the product or
  1454. 54:26service and adds to the current product
  1455. 54:28or service lines
  1456. 54:30to implement dfss a business system has
  1457. 54:33to know its customer requirements
  1458. 54:36dfss can be used to design a new product
  1459. 54:39or service a new process for a new
  1460. 54:41product or service or redesign of an
  1461. 54:44existing product or service to meet
  1462. 54:46customer requirements
  1463. 54:48let us learn about processes for dfss in
  1464. 54:51the next screen
  1465. 54:55the two major processes for dfss are
  1466. 54:58idov and dmadv
  1467. 55:02idov stands for identify design optimize
  1468. 55:06and verify
  1469. 55:08dmadb stands for define measure analyze
  1470. 55:13design and verify
  1471. 55:15in the idov process
  1472. 55:18the first step involves identifying
  1473. 55:20specific customer needs based on which
  1474. 55:22the new product and business process
  1475. 55:24will be designed
  1476. 55:26the next step involves design which
  1477. 55:28involves identifying functional
  1478. 55:30requirements developing alternate
  1479. 55:32concepts evaluating the alternatives
  1480. 55:35selecting a best fit concept and
  1481. 55:38predicting sigma capability
  1482. 55:40tools such as fmea are used here
  1483. 55:44the third step optimize uses a
  1484. 55:47statistical approach to calculate
  1485. 55:49tolerance with respect to the desired
  1486. 55:51output
  1487. 55:52when idov is implemented to design a
  1488. 55:55process expected to work at six sigma
  1489. 55:58level this is checked in the optimize
  1490. 56:00phase if the process does not meet
  1491. 56:03expectations the optimize phase helps in
  1492. 56:06developing detailed design elements
  1493. 56:08predicting performances and optimizing
  1494. 56:11design
  1495. 56:12the last stage of idov is to verify that
  1496. 56:16is to test and validate the design and
  1497. 56:18finally to check conformance to six
  1498. 56:20sigma standards
  1499. 56:22the other process dmadv has five stages
  1500. 56:27the first stage is to define the
  1501. 56:28customer requirements and goals for the
  1502. 56:30process product or service
  1503. 56:33next measure and match performance to
  1504. 56:35customer requirements
  1505. 56:37the third stage involves analysis and
  1506. 56:40assessment of the design for the process
  1507. 56:42product or service the next step is to
  1508. 56:45design and implement the array of latest
  1509. 56:47processes required for the new process
  1510. 56:50product or service
  1511. 56:52the final stage is to verify results and
  1512. 56:54maintain performance
  1513. 56:57in the next screen we will look at the
  1514. 56:59differences between idov and dmadb
  1515. 57:05the primary difference between idov and
  1516. 57:08dmadb is that while i
  1517. 57:11is used only to design a new product or
  1518. 57:14service
  1519. 57:15dmadb can be used to design either a new
  1520. 57:18product or service or redesign an
  1521. 57:21existing product or service
  1522. 57:23idov involves design of a new process
  1523. 57:27while dmadv involves redesigning an
  1524. 57:30existing process
  1525. 57:31in idov no analysis or measurement of
  1526. 57:34existing process is done and the whole
  1527. 57:37development is new
  1528. 57:39the design step immediately follows the
  1529. 57:41identification of customer requirements
  1530. 57:44in contrast dmadv the existing product
  1531. 57:48service or process is examined
  1532. 57:50thoroughly before moving to the design
  1533. 57:52phase the design stage comes only after
  1534. 57:56defining requirements and analyzing the
  1535. 57:58existing product service or process
  1536. 58:02in the following screen we will learn
  1537. 58:04about tool quality function deployment
  1538. 58:06or qfd which is one of the dfss tools
  1539. 58:13qfd also called voice of customer or voc
  1540. 58:17or house of quality
  1541. 58:19is a predefined method of identifying
  1542. 58:21customer requirements
  1543. 58:23it is a systematic process to understand
  1544. 58:26the needs of the customer and convert
  1545. 58:28them into a set of design and
  1546. 58:30manufacturing requirements
  1547. 58:32qfd motivates business to focus on its
  1548. 58:35customers and design products that are
  1549. 58:38competitive in lesser time and at lesser
  1550. 58:40cost
  1551. 58:41the primary learning from qfd includes
  1552. 58:45which customer requirements are most
  1553. 58:47important what the organization
  1554. 58:49strengths and weaknesses are
  1555. 58:51where an organization should focus their
  1556. 58:53efforts and where most of the work needs
  1557. 58:56to be done
  1558. 58:58to learn from qfd the organization
  1559. 59:00should ask relevant questions to
  1560. 59:02customers and tabulate them to bring out
  1561. 59:05a set of parameters critical to the
  1562. 59:07design of the product
  1563. 59:09apart from understanding customer
  1564. 59:11requirements it is also important to
  1565. 59:13know what would happen if a particular
  1566. 59:15product or service fails when being used
  1567. 59:18by a customer
  1568. 59:20it is necessary to understand the
  1569. 59:21effects of failure on the customer to
  1570. 59:24ensure preventive actions are taken
  1571. 59:26and to be able to answer the customers
  1572. 59:28in the event of failure
  1573. 59:31in the next screen we will look at
  1574. 59:32another dfss tool
  1575. 59:34failure modes and effects analysis or
  1576. 59:37fmea
  1577. 59:41failure modes and effects analysis or
  1578. 59:44fmea is a preemptive tool that helps any
  1579. 59:47system to identify potential pitfalls at
  1580. 59:50all levels of a business system
  1581. 59:53it helps the organization to identify
  1582. 59:55and prioritize the different failure
  1583. 59:57modes of its product or service and what
  1584. 1:00:00effect the failure would have on the
  1585. 1:00:01customer
  1586. 1:00:02it helps in identifying the critical
  1587. 1:00:05areas in a system on which the
  1588. 1:00:06organization's efforts can be focused
  1589. 1:00:09note that while fmea enables
  1590. 1:00:12identification of critical areas it does
  1591. 1:00:15not offer solutions to the identified
  1592. 1:00:17problems
  1593. 1:00:18we will look at the varieties of fmea
  1594. 1:00:21such as dfmea and pfmea in the next
  1595. 1:00:26screen pfmea stands for process failure
  1596. 1:00:31mode and effects analysis
  1597. 1:00:33and df-mea stands for design failure
  1598. 1:00:37mode and effects analysis
  1599. 1:00:40pfmea
  1600. 1:00:41is used on a new or existing process to
  1601. 1:00:44uncover potential failures
  1602. 1:00:46it is done in the quality planning phase
  1603. 1:00:48to act as an aid during production
  1604. 1:00:51a process fmea can involve fabrication
  1605. 1:00:54assembly transactions or services
  1606. 1:00:58dfmea is used in the design of a new
  1607. 1:01:01product service or process to uncover
  1608. 1:01:03potential failures
  1609. 1:01:05the purpose is to find out how failure
  1610. 1:01:07modes affect the system and to reduce
  1611. 1:01:09the effect of failure on the system
  1612. 1:01:12this is done before the product is sent
  1613. 1:01:14to manufacturing
  1614. 1:01:15all design deficiencies are sorted out
  1615. 1:01:17at the end of this process
  1616. 1:01:20in the following screen we will
  1617. 1:01:21understand fmea risk priority number
  1618. 1:01:26fmea risk priority number or rpm is a
  1619. 1:01:31measure used to quantify or assess risk
  1620. 1:01:33associated with the design or process
  1621. 1:01:36assessing risk helps identify critical
  1622. 1:01:39failure modes
  1623. 1:01:40higher the rpn higher the priority the
  1624. 1:01:43product or process receives
  1625. 1:01:46rpn is a product of three numbers
  1626. 1:01:49severity of a failure
  1627. 1:01:51occurrence of a failure and the
  1628. 1:01:53detectability of a failure
  1629. 1:01:55all these numbers are given a value on a
  1630. 1:01:58scale of one to ten
  1631. 1:01:59the minimum value of rpn is one and the
  1632. 1:02:03maximum value is one thousand a failure
  1633. 1:02:06mode with a higher currency rating means
  1634. 1:02:08the failure mode occurs very frequently
  1635. 1:02:11a mode with a high severity rating means
  1636. 1:02:14that the mode is really critical to
  1637. 1:02:16ensure safety of operations
  1638. 1:02:18a mode with a high detection rating
  1639. 1:02:20means that the current controls are not
  1640. 1:02:22sufficient
  1641. 1:02:23in the next screen we will look at the
  1642. 1:02:25fmea table
  1643. 1:02:30the fmea table helps plan improvement
  1644. 1:02:33initiatives by underlining why and how
  1645. 1:02:35failure modes occur and helps
  1646. 1:02:37organizations plan for their prevention
  1647. 1:02:40typically fmea is applied on the output
  1648. 1:02:43of root cause analysis and is a better
  1649. 1:02:46tool for focus or prioritization as
  1650. 1:02:48compared to multi-voting
  1651. 1:02:51one important aspect of fmea is that it
  1652. 1:02:54does not need data
  1653. 1:02:56experts in a particular area can form
  1654. 1:02:59the fmea table without having to look at
  1655. 1:03:02data from any source
  1656. 1:03:04in functions such as human resources the
  1657. 1:03:07fmea table is very useful as there might
  1658. 1:03:11not be much data available to the
  1659. 1:03:13problem-solving team
  1660. 1:03:15the sample fmea table is given on the
  1661. 1:03:18screen
  1662. 1:03:19please go through the contents for
  1663. 1:03:21better understanding
  1664. 1:03:22in the following screen we will discuss
  1665. 1:03:25severity of risk priority number and
  1666. 1:03:27scale criteria
  1667. 1:03:31let us first discuss severity
  1668. 1:03:33severity refers to the seriousness of
  1669. 1:03:35the effect of the failure mode
  1670. 1:03:38or how critical the failure mode is to
  1671. 1:03:40the customer or the process
  1672. 1:03:42the severity of a failure mode is rated
  1673. 1:03:45on a scale of 1 to 10
  1674. 1:03:47using a severity table
  1675. 1:03:50different industries follow different
  1676. 1:03:52structures for the severity table
  1677. 1:03:54a high severity rating indicates a mode
  1678. 1:03:57is critical to operational safety
  1679. 1:04:00for example a team working on fmea of a
  1680. 1:04:03radioactive plant may insert fatal as
  1681. 1:04:06the effect with rating 10.
  1682. 1:04:09another example is the severity table
  1683. 1:04:11for a sports team
  1684. 1:04:13the team manager wants to rate the
  1685. 1:04:15severity of failure of the team in an
  1686. 1:04:17upcoming game
  1687. 1:04:18she might rate it at nine given that the
  1688. 1:04:21team would lose a big sponsorship should
  1689. 1:04:23they face defeat
  1690. 1:04:25which could in turn be hazardous to the
  1691. 1:04:27team's future
  1692. 1:04:29shown here is a generalized table of
  1693. 1:04:31severity
  1694. 1:04:32the severity rating can never be changed
  1695. 1:04:36for example if a mode has a rating of
  1696. 1:04:38nine before improvement it will continue
  1697. 1:04:40to have a rating of 9 after improvement
  1698. 1:04:432.
  1699. 1:04:44let us look at occurrence of rpm and
  1700. 1:04:47scale criteria
  1701. 1:04:50occurrence is the probability that a
  1702. 1:04:52specific cause will result in the
  1703. 1:04:54particular failure mode
  1704. 1:04:56as with severity occurrences rated on a
  1705. 1:04:59scale of one to ten based on a table
  1706. 1:05:02like the severity table higher the
  1707. 1:05:04occurrence of a failure higher is its
  1708. 1:05:06rating
  1709. 1:05:07again this table might vary depending on
  1710. 1:05:09the industry and scenario
  1711. 1:05:12sometimes the project team can use data
  1712. 1:05:14here if available
  1713. 1:05:16based on past data the probability of
  1714. 1:05:19occurrence of a failure can easily be
  1715. 1:05:21rated
  1716. 1:05:22shown here is a generalized table let us
  1717. 1:05:25next look at detection of rpn and scale
  1718. 1:05:28criteria
  1719. 1:05:31detection is the probability that a
  1720. 1:05:33particular failure will be detected
  1721. 1:05:36the table shown here is again a
  1722. 1:05:38generalized one
  1723. 1:05:40the rating here is a bit different from
  1724. 1:05:42severity or occurrence
  1725. 1:05:44higher the detectability of a failure
  1726. 1:05:46lower is its rating
  1727. 1:05:48this is because if the failure can
  1728. 1:05:51easily be detected then everyone would
  1729. 1:05:54know of it and therefore there would be
  1730. 1:05:56less or no damage
  1731. 1:05:58for example if detection is impossible
  1732. 1:06:01the failure is given a rating of ten
  1733. 1:06:03please note that at the start of a six
  1734. 1:06:05sigma project the failure mode is given
  1735. 1:06:08a relatively high detection rating
  1736. 1:06:10let us look at an example of fmea and
  1737. 1:06:14rpn in the next screen
  1738. 1:06:18in this example a bank wants to
  1739. 1:06:20recognize and prioritize the risks
  1740. 1:06:22involved in the process of withdrawing
  1741. 1:06:24cash from an atm
  1742. 1:06:27it can be observed from the table that
  1743. 1:06:29not having a control in place for
  1744. 1:06:31network issues has the highest rpm
  1745. 1:06:35this is due to the detectability for a
  1746. 1:06:37network issue being very low
  1747. 1:06:40the next set of information in the table
  1748. 1:06:42shows the action taken by the bank's
  1749. 1:06:44management to address the failure modes
  1750. 1:06:47following the implementation the new rpn
  1751. 1:06:50is calculated retaining the security
  1752. 1:06:52level at nine
  1753. 1:06:54this is because the actions were not
  1754. 1:06:56directed at reducing the severity but at
  1755. 1:06:59the causes of failure
  1756. 1:07:01it can be seen that the new rpn is much
  1757. 1:07:04lower and the risk for both causes has
  1758. 1:07:07been mitigated
  1759. 1:07:09this lesson will cover the details of
  1760. 1:07:11the define phase six sigma can be
  1761. 1:07:14applied to everything around
  1762. 1:07:16it can be applied across almost 70
  1763. 1:07:19different sectors however it cannot be
  1764. 1:07:21applied to all problems
  1765. 1:07:24the first step is to check if the
  1766. 1:07:26project qualifies to be a six sigma
  1767. 1:07:29project
  1768. 1:07:30the questions that need to be asked are
  1769. 1:07:32as follows
  1770. 1:07:34is there an existing process
  1771. 1:07:36to implement the dmac methodology of
  1772. 1:07:38problem solving a process needs to exist
  1773. 1:07:42the process should be in operation for
  1774. 1:07:44the development of the product or
  1775. 1:07:45service
  1776. 1:07:47is there a problem in the process
  1777. 1:07:50ideally the process should not have any
  1778. 1:07:53problem
  1779. 1:07:54if there is a problem in the process
  1780. 1:07:56performance the process needs to be
  1781. 1:07:59improved
  1782. 1:08:01is the problem measurable
  1783. 1:08:03the problem has to be measurable in
  1784. 1:08:05order to assess the root cause and the
  1785. 1:08:08impact of the problem on the process
  1786. 1:08:12does the problem impact customer
  1787. 1:08:14satisfaction
  1788. 1:08:16if the problem affects customer
  1789. 1:08:18satisfaction an action needs to be taken
  1790. 1:08:20immediately
  1791. 1:08:22else the customer may start finding
  1792. 1:08:24alternate products or switch to
  1793. 1:08:26competitors products
  1794. 1:08:28does working on the problem impact
  1795. 1:08:30profits of the company
  1796. 1:08:32it is very essential to assess the
  1797. 1:08:34impact of the project on the profits of
  1798. 1:08:37the company
  1799. 1:08:38if the project affects the profits of
  1800. 1:08:40the company adversely then such a
  1801. 1:08:43project is not feasible
  1802. 1:08:46is the root cause of the problem unknown
  1803. 1:08:49if the root cause of the problem is
  1804. 1:08:51visible then a six sigma project is not
  1805. 1:08:54required
  1806. 1:08:56other problem solving techniques can be
  1807. 1:08:58used in this case
  1808. 1:09:00is the solution unknown
  1809. 1:09:03if the solution to the problem is
  1810. 1:09:05already known then there is no need for
  1811. 1:09:08any project
  1812. 1:09:09the company can directly implement the
  1813. 1:09:11solution
  1814. 1:09:13the define phase of dmacc will be
  1815. 1:09:15introduced in the next
  1816. 1:09:18screen the six sigma project process is
  1817. 1:09:22known as a dmacc process
  1818. 1:09:24define is the first phase in the six
  1819. 1:09:27sigma project process
  1820. 1:09:29in the define phase the problem is
  1821. 1:09:32defined and the six sigma team is formed
  1822. 1:09:36the objectives of the define phase are
  1823. 1:09:38as follows
  1824. 1:09:40clearly define the problem statement
  1825. 1:09:42through customer analysis
  1826. 1:09:45understand customer requirements
  1827. 1:09:47and ensure that the six sigma project
  1828. 1:09:50goals are aligned to these requirements
  1829. 1:09:53define the objectives of the six sigma
  1830. 1:09:56project
  1831. 1:09:57plan the project in terms of time budget
  1832. 1:10:00and resource requirements
  1833. 1:10:03define the team structure for the
  1834. 1:10:05project
  1835. 1:10:06and establish roles and responsibilities
  1836. 1:10:09in the next screen let us learn about
  1837. 1:10:12benchmarking
  1838. 1:10:14benchmarking is the process of comparing
  1839. 1:10:16an organization's business processes
  1840. 1:10:19practices and performance metrics with
  1841. 1:10:22that of industry leaders
  1842. 1:10:24there are various types of benchmarking
  1843. 1:10:27let us briefly look at each type process
  1844. 1:10:30benchmarking entails comparing specific
  1845. 1:10:33processes to a leading company or an
  1846. 1:10:35industry standard
  1847. 1:10:37this is useful to obtain a simplified
  1848. 1:10:39view of business operations
  1849. 1:10:41and enables a focused review of major
  1850. 1:10:44business functions
  1851. 1:10:46process benchmarking includes
  1852. 1:10:48comparisons of production processes
  1853. 1:10:51data collection processes
  1854. 1:10:53performance indicators and productivity
  1855. 1:10:56and efficiency reviews
  1856. 1:10:58financial benchmarking is performed to
  1857. 1:11:01assess overall competitiveness and
  1858. 1:11:03productivity
  1859. 1:11:04it is done by running a detailed
  1860. 1:11:06financial analysis and analyzing the
  1861. 1:11:09result
  1862. 1:11:10performance benchmarking involves
  1863. 1:11:12comparison of products and services with
  1864. 1:11:14those of competitors
  1865. 1:11:16with the intention of evaluating the
  1866. 1:11:18organization's competitiveness
  1867. 1:11:21product benchmarking involves designing
  1868. 1:11:23new products or services or upgrading
  1869. 1:11:26existing products or services
  1870. 1:11:29this can involve reverse engineering a
  1871. 1:11:31competitor's products to study the
  1872. 1:11:33strengths and weaknesses and modeling
  1873. 1:11:35the new product on these findings
  1874. 1:11:38strategic benchmarking refers to
  1875. 1:11:40studying strategies and problem-solving
  1876. 1:11:42approaches in other industries
  1877. 1:11:45functional benchmarking is the focused
  1878. 1:11:48analysis of a single function with the
  1879. 1:11:50aim of improving it
  1880. 1:11:52complex functions may need to be divided
  1881. 1:11:54into processes before benchmarking is
  1882. 1:11:57done
  1883. 1:11:58competitive benchmarking includes
  1884. 1:12:00standardizing organizational strategies
  1885. 1:12:03process products services and procedures
  1886. 1:12:07against the competitors in the same
  1887. 1:12:08industry
  1888. 1:12:10collaborative benchmarking is a type of
  1889. 1:12:13benchmarking where the standardization
  1890. 1:12:15of various business parameters is
  1891. 1:12:17carried out by a group of companies and
  1892. 1:12:19the information is shared if the
  1893. 1:12:22subsidiary units of a company or its
  1894. 1:12:24various branches carry out the
  1895. 1:12:26benchmarking it is called collaborative
  1896. 1:12:28benchmarking
  1897. 1:12:30let us take a look at best practices for
  1898. 1:12:33benchmarking in the next screen
  1899. 1:12:37best practice is a method that ensures
  1900. 1:12:39continuous improvement leading to
  1901. 1:12:41exceptional performance
  1902. 1:12:43it is also a method to sustain and
  1903. 1:12:45develop the process continuously
  1904. 1:12:48some of the best practices in
  1905. 1:12:50benchmarking are as follows
  1906. 1:12:53increase the objectives or scope of
  1907. 1:12:55benchmarking
  1908. 1:12:57set the standards and path to be
  1909. 1:12:58followed at the initial stage
  1910. 1:13:01reduce unnecessary effort and comply
  1911. 1:13:04with the scope
  1912. 1:13:05recognize the best in the industry to
  1913. 1:13:08set a benchmark
  1914. 1:13:10share the information derived from
  1915. 1:13:12benchmarking
  1916. 1:13:14in the next screen we will discuss
  1917. 1:13:16project selection
  1918. 1:13:20let us understand process business
  1919. 1:13:23process and business system in this
  1920. 1:13:25screen
  1921. 1:13:27a process is a series of steps designed
  1922. 1:13:30to produce a product or service to meet
  1923. 1:13:33the requirement of a customer
  1924. 1:13:35a process mainly consists of three
  1925. 1:13:37elements
  1926. 1:13:39input
  1927. 1:13:40process and output
  1928. 1:13:42a business process is a systematic
  1929. 1:13:44organization of objects such as people
  1930. 1:13:47machinery and materials
  1931. 1:13:49into work activities designed to produce
  1932. 1:13:52a required product or service
  1933. 1:13:55as shown on the screen a process is a
  1934. 1:13:58subset of a business process
  1935. 1:14:00a business process is in turn a part of
  1936. 1:14:03a business system
  1937. 1:14:05a business system is a value-added chain
  1938. 1:14:08of various business processes such as
  1939. 1:14:11sales or finance
  1940. 1:14:13for example
  1941. 1:14:14payroll calculation is a process in the
  1942. 1:14:17hr business process of an i t company
  1943. 1:14:20which is a business system
  1944. 1:14:23in the next screen we will look at the
  1945. 1:14:25process elements
  1946. 1:14:28let us discuss the challenges to
  1947. 1:14:30business process improvement in this
  1948. 1:14:32screen
  1949. 1:14:33the improvement to a business process of
  1950. 1:14:36an organization faces challenges due to
  1951. 1:14:38the traditional business system
  1952. 1:14:40structure
  1953. 1:14:41because it is generally grouped around
  1954. 1:14:43the functional aspect
  1955. 1:14:45the main problem in a functionally
  1956. 1:14:47grouped organization is the movement or
  1957. 1:14:50flow of a product or service
  1958. 1:14:52a product or service has to go through
  1959. 1:14:54various functions and their functional
  1960. 1:14:57elements to reach the customer or end
  1961. 1:14:59user
  1962. 1:15:00the other problem is management of the
  1963. 1:15:02flow of products or services across
  1964. 1:15:05various functional elements
  1965. 1:15:07this is difficult as usually there is no
  1966. 1:15:09one in charge
  1967. 1:15:11these business process improvement
  1968. 1:15:13problems can be solved using the project
  1969. 1:15:16management approach to produce the
  1970. 1:15:18product or service
  1971. 1:15:20in the next screen we will learn about
  1972. 1:15:22process owners and different
  1973. 1:15:24stakeholders of a project
  1974. 1:15:28the representation of where the process
  1975. 1:15:30owner and stakeholders are placed in the
  1976. 1:15:32organizational hierarchy is on the
  1977. 1:15:34screen
  1978. 1:15:35the process owner is a person at a
  1979. 1:15:37senior level in the hierarchy
  1980. 1:15:40he is the one who takes responsibility
  1981. 1:15:42for the performance and execution of a
  1982. 1:15:44process
  1983. 1:15:45and also has the authority and the
  1984. 1:15:47ability to make necessary changes
  1985. 1:15:50on the other hand a stakeholder is a
  1986. 1:15:53person group or organization which is
  1987. 1:15:55affected or can affect an organization's
  1988. 1:15:58actions
  1989. 1:16:00businesses have many stakeholders like
  1990. 1:16:02stockholders customers suppliers company
  1991. 1:16:05management
  1992. 1:16:06employees of an organization and their
  1993. 1:16:08families the society etc
  1994. 1:16:11let us discuss the effects of process
  1995. 1:16:14failure on various stakeholders in the
  1996. 1:16:16next screen
  1997. 1:16:18while it is an absolute business
  1998. 1:16:20necessity to keep one stakeholder
  1999. 1:16:22satisfied at all times
  2000. 1:16:23failure to meet one or more process
  2001. 1:16:25objectives may result in negative
  2002. 1:16:27effects on them
  2003. 1:16:29in such situations for the stockholders
  2004. 1:16:32the perceived value for the company gets
  2005. 1:16:34reduced
  2006. 1:16:35customers may seek other competitors for
  2007. 1:16:37their deals while imposing penalties and
  2008. 1:16:40finding recourse in legal action against
  2009. 1:16:42the company
  2010. 1:16:43suppliers may be on the losing front
  2011. 1:16:46with delayed payments or not being paid
  2012. 1:16:48at all
  2013. 1:16:49company management may require cost cut
  2014. 1:16:52down
  2015. 1:16:52employees will receive diminishing wages
  2016. 1:16:55the community and society will be
  2017. 1:16:58affected due to pollution created by the
  2018. 1:17:00organization
  2019. 1:17:02in the next screen we will understand
  2020. 1:17:04the relationship between business and
  2021. 1:17:06the stakeholder
  2022. 1:17:09in the diagram shown on the screen
  2023. 1:17:11each stakeholder is both a supplier as
  2024. 1:17:14well as a customer
  2025. 1:17:15forming many closed loop processes that
  2026. 1:17:18must be managed controlled balanced and
  2027. 1:17:20optimized for the business to thrive
  2028. 1:17:23communication is the key in such
  2029. 1:17:25situations and is facilitated through
  2030. 1:17:27internal company processes
  2031. 1:17:30the next screen covers the importance
  2032. 1:17:32and relevance of stakeholder analysis
  2033. 1:17:35stakeholder analysis is an important
  2034. 1:17:38task to be completed before doing a six
  2035. 1:17:40sigma project
  2036. 1:17:42a business has many stakeholders and any
  2037. 1:17:46change to a business process affects
  2038. 1:17:48some or all of them
  2039. 1:17:50when a process does not meet its
  2040. 1:17:52objectives
  2041. 1:17:53it results in the stakeholders being
  2042. 1:17:55negatively affected
  2043. 1:17:57which in turn affects the organization's
  2044. 1:17:59performance
  2045. 1:18:01the six sigma team must factor in the
  2046. 1:18:03reasons why a stakeholder may oppose the
  2047. 1:18:06change effort
  2048. 1:18:08let us proceed to the next topic of this
  2049. 1:18:10lesson in the following screen
  2050. 1:18:14in this topic we will discuss voice of
  2051. 1:18:17the customer
  2052. 1:18:18let us start with how to identify the
  2053. 1:18:20customer in the following screen
  2054. 1:18:25customers are the most important part of
  2055. 1:18:27any business
  2056. 1:18:29a customer is someone who decides to
  2057. 1:18:31purchase pays consumes and gets affected
  2058. 1:18:34by a particular product or service
  2059. 1:18:37it is critical to identify and
  2060. 1:18:39understand the customer requirements
  2061. 1:18:42the products or services can be designed
  2062. 1:18:44according to these requirements
  2063. 1:18:46consequently the company is able to
  2064. 1:18:49provide products or services the
  2065. 1:18:51customers are willing to purchase there
  2066. 1:18:54are two types of customers
  2067. 1:18:56internal and external customers
  2068. 1:18:59in the next screen we will learn about
  2069. 1:19:01internal customers
  2070. 1:19:05an internal customer can be defined as
  2071. 1:19:07anyone within the business system who is
  2072. 1:19:10affected by the product or the service
  2073. 1:19:12while it is being developed
  2074. 1:19:15most often internal customers are the
  2075. 1:19:17employees of the company
  2076. 1:19:20for example
  2077. 1:19:21let us assume that there is a series of
  2078. 1:19:23processes in a particular business
  2079. 1:19:25system
  2080. 1:19:27in such a scenario
  2081. 1:19:29the second process is the internal
  2082. 1:19:31customer for the first process
  2083. 1:19:34the third process is an internal
  2084. 1:19:36customer for the second process and so
  2085. 1:19:39on
  2086. 1:19:40the basic needs of an internal customer
  2087. 1:19:42are to be provided proper tools and
  2088. 1:19:45necessary equipment imparted proper
  2089. 1:19:47training and given specific instructions
  2090. 1:19:50to carry out their responsibilities
  2091. 1:19:53however the needs are not limited to
  2092. 1:19:55these alone
  2093. 1:19:57other needs include the provision of
  2094. 1:19:58company newsletters projects storyboards
  2095. 1:20:01to display the letters etc team meetings
  2096. 1:20:03to share business news and announcements
  2097. 1:20:06staff meeting to share information and
  2098. 1:20:08quality awards from suppliers
  2099. 1:20:11an internal customer is important
  2100. 1:20:14first of all the activities of an
  2101. 1:20:16internal customer directly affect the
  2102. 1:20:18final or ultimate customer
  2103. 1:20:20secondly the activities of an internal
  2104. 1:20:23customer affect the next process in the
  2105. 1:20:25system
  2106. 1:20:27finally an internal customer also
  2107. 1:20:29affects the quality of the product
  2108. 1:20:30developed or service provided
  2109. 1:20:33when the needs of the internal customers
  2110. 1:20:36in most cases employees are met
  2111. 1:20:39they are more likely to have higher
  2112. 1:20:41perceptions of quality and also
  2113. 1:20:43contribute to greater productivity
  2114. 1:20:46the satisfaction levels of the internal
  2115. 1:20:48customers can be improved in various
  2116. 1:20:51ways these include a higher amount of
  2117. 1:20:53internal communication through company
  2118. 1:20:56newsletters and team meetings
  2119. 1:20:58recognitions for work quality awards etc
  2120. 1:21:01constant training on how to be ahead and
  2121. 1:21:03well equipped in a competitive
  2122. 1:21:05environment is very essential too
  2123. 1:21:08in the next screen we will learn about
  2124. 1:21:10external customers
  2125. 1:21:13this screen focuses on the positive
  2126. 1:21:15effects of a project on the customers
  2127. 1:21:18the most important aspect of any process
  2128. 1:21:21improvement project is the customers
  2129. 1:21:24internal customers are the ones who
  2130. 1:21:26drive the project
  2131. 1:21:27hence the effect of the project on
  2132. 1:21:29internal customers is a critical factor
  2133. 1:21:32that needs to be considered
  2134. 1:21:34the positive impact of a project on the
  2135. 1:21:36internal customers is as follows
  2136. 1:21:40the project is driven by highly
  2137. 1:21:42motivated individuals or internal
  2138. 1:21:44customers who are aware of the project
  2139. 1:21:46objectives and scope
  2140. 1:21:49individuals belonging to a credible
  2141. 1:21:51project understand the project
  2142. 1:21:53deliverables and display high levels of
  2143. 1:21:56job satisfaction
  2144. 1:21:58these individuals go the extra mile to
  2145. 1:22:00take up tasks beyond their job
  2146. 1:22:02description
  2147. 1:22:04such individuals make a highly motivated
  2148. 1:22:06team focused on delivering their
  2149. 1:22:08responsibilities in order to meet the
  2150. 1:22:10customer requirements
  2151. 1:22:13working together in a positive
  2152. 1:22:14environment also improves team spirit
  2153. 1:22:17and bonding
  2154. 1:22:19the positive impact of a project on the
  2155. 1:22:21external customers is as follows
  2156. 1:22:25process improvement projects analyze the
  2157. 1:22:27problems and come up with an effective
  2158. 1:22:30solution
  2159. 1:22:31consequently ensuring a better product
  2160. 1:22:34a successful process improvement project
  2161. 1:22:36assists the organization in effectively
  2162. 1:22:39meeting customer expectations or
  2163. 1:22:41requirements
  2164. 1:22:42there is visible improvement in customer
  2165. 1:22:45service
  2166. 1:22:46good quality product and service ensures
  2167. 1:22:48high customer satisfaction
  2168. 1:22:51let us learn about different methods of
  2169. 1:22:52customer data collection in the
  2170. 1:22:54following screen
  2171. 1:22:58once you begin to identify the customer
  2172. 1:23:01types you need to look forward to
  2173. 1:23:03collecting customer data
  2174. 1:23:05collecting data from customers is very
  2175. 1:23:07essential as it helps consider the
  2176. 1:23:09levels at which these customers affect
  2177. 1:23:11the business
  2178. 1:23:12begin by collecting feedback from both
  2179. 1:23:15internal as well as external customers
  2180. 1:23:18customer feedback helps fill the gaps
  2181. 1:23:20and improve the various business
  2182. 1:23:22processes in the organization
  2183. 1:23:25it helps define a good quality product
  2184. 1:23:27as perceived by the customer
  2185. 1:23:29and identify qualities that make the
  2186. 1:23:31competitors products or service better
  2187. 1:23:34it also helps identify factors which
  2188. 1:23:37provide a competitive edge to the
  2189. 1:23:38product or service on offer
  2190. 1:23:41there are various methods to collect
  2191. 1:23:43feedback from the customers many of you
  2192. 1:23:45might be involved in a similar activity
  2193. 1:23:47at some point or the other
  2194. 1:23:49popular and common methods are surveys
  2195. 1:23:52conducted through questionnaires focus
  2196. 1:23:54groups individual interviews with the
  2197. 1:23:56customers
  2198. 1:23:57customer complaints received via call
  2199. 1:24:00centers emails and feedback forms are
  2200. 1:24:03also quite prevalent
  2201. 1:24:05feedback received in this form are from
  2202. 1:24:07dissatisfied customers
  2203. 1:24:09in the next screen we will learn about
  2204. 1:24:11questionnaires
  2205. 1:24:15let us discuss the advantages and
  2206. 1:24:17disadvantages of questionnaires in this
  2207. 1:24:19screen
  2208. 1:24:21the advantages of a questionnaire are
  2209. 1:24:23that it costs less
  2210. 1:24:24the phone response rate is high anywhere
  2211. 1:24:27from around 70 to 90 percent and it
  2212. 1:24:30produces faster results
  2213. 1:24:32also analysis of male questionnaires
  2214. 1:24:35requires few trained resources
  2215. 1:24:38questionnaire is a method used to gather
  2216. 1:24:40data however there are a few
  2217. 1:24:42disadvantages associated with it
  2218. 1:24:46there may be incomplete results and
  2219. 1:24:48unanswered questions leading to a lack
  2220. 1:24:50of clarity
  2221. 1:24:52the response rate of mail surveys is
  2222. 1:24:54about 20 to 30 percent only
  2223. 1:24:57at times phone surveys can produce
  2224. 1:24:59undesirable results as the interviewer
  2225. 1:25:02can influence the person being
  2226. 1:25:04interviewed
  2227. 1:25:06we will differentiate between telephone
  2228. 1:25:08survey and web survey in the next screen
  2229. 1:25:12there are different methods to collect
  2230. 1:25:14data for a survey
  2231. 1:25:16the methods need to be based on the
  2232. 1:25:18requirements and needs of the
  2233. 1:25:19organization
  2234. 1:25:21the popular methods of survey are the
  2235. 1:25:23telephone survey and web survey both
  2236. 1:25:26have their own drawbacks and benefits
  2237. 1:25:28which are given on the screen
  2238. 1:25:30the organization needs to choose a
  2239. 1:25:32method of collecting data according to
  2240. 1:25:34the situation
  2241. 1:25:35it is recommended to go through the
  2242. 1:25:37content for a better understanding in
  2243. 1:25:40the next screen we will learn about
  2244. 1:25:42focus groups
  2245. 1:25:45let us now discuss the advantages and
  2246. 1:25:47disadvantages of using a focus group for
  2247. 1:25:50data collection
  2248. 1:25:51the interaction in a focus group
  2249. 1:25:53generates information provides in-depth
  2250. 1:25:56responses and can address more complex
  2251. 1:25:59questions or qualitative data
  2252. 1:26:01it is an excellent platform to get
  2253. 1:26:03critical to quality or ctq definitions
  2254. 1:26:06as well
  2255. 1:26:07on the other hand the disadvantages of
  2256. 1:26:10focus groups are that the learning only
  2257. 1:26:12applies to those within the group and it
  2258. 1:26:14is not possible to generalize
  2259. 1:26:17the information collected is more
  2260. 1:26:19qualitative than quantitative which is
  2261. 1:26:21another drawback
  2262. 1:26:23additionally they can also generate a
  2263. 1:26:25lot of information from anecdotes and
  2264. 1:26:27incidents experienced by the individuals
  2265. 1:26:30in the group
  2266. 1:26:31in the next screen we will discuss the
  2267. 1:26:33interview technique
  2268. 1:26:36this screen discusses advantages and
  2269. 1:26:39disadvantages of using the interview
  2270. 1:26:41technique for data collection
  2271. 1:26:43interviews have a capability to handle
  2272. 1:26:45complex questions and a large amount of
  2273. 1:26:48information
  2274. 1:26:49they also allow us to use visual aids in
  2275. 1:26:52the process
  2276. 1:26:53it is a better method to be employed
  2277. 1:26:55when people do not respond willingly and
  2278. 1:26:57or accurately by phone or email
  2279. 1:27:00however there are some shortcomings as
  2280. 1:27:02well
  2281. 1:27:03interviews are time consuming and the
  2282. 1:27:05resources or interviewer needs to be
  2283. 1:27:07trained and experienced to carry out the
  2284. 1:27:10task
  2285. 1:27:11let us discuss the importance and
  2286. 1:27:13urgency of these inputs in the next
  2287. 1:27:15screen
  2288. 1:27:19the table shows the importance and
  2289. 1:27:21urgency of different kinds of input
  2290. 1:27:24to understand the kind of input to be
  2291. 1:27:26chosen
  2292. 1:27:27different kinds of methods for
  2293. 1:27:28collecting data are identified
  2294. 1:27:31telephone survey
  2295. 1:27:32web survey and interview are the data
  2296. 1:27:34collection methods identified
  2297. 1:27:37to select the best methods the criteria
  2298. 1:27:40or the factors which are important to
  2299. 1:27:42the organization are listed
  2300. 1:27:44the criteria are the factors based on
  2301. 1:27:46which an organization is going to make
  2302. 1:27:48decisions
  2303. 1:27:49the list of factors is then given
  2304. 1:27:51weightage based on the importance of
  2305. 1:27:53each factor in decision making
  2306. 1:27:55as seen cost is the most important
  2307. 1:27:58criterion for which the weightage is
  2308. 1:27:59given twenty
  2309. 1:28:01response rate of the customer is next
  2310. 1:28:03important factor and the list follows
  2311. 1:28:06visualizing feature and compiling and
  2312. 1:28:08analyzing data are the factors which
  2313. 1:28:10have the lowest impact on the decision
  2314. 1:28:12of selecting the methods for data
  2315. 1:28:14collection
  2316. 1:28:16each of the data collecting methods is
  2317. 1:28:17rated between 1 and 10
  2318. 1:28:19based on its impact on the listed
  2319. 1:28:21factors
  2320. 1:28:22with 10 being highly favorable to the
  2321. 1:28:24organization and one being least
  2322. 1:28:27favorable
  2323. 1:28:28after rating all the methods with the
  2324. 1:28:30factors listed the sum or total is
  2325. 1:28:33calculated
  2326. 1:28:34the calculation of the total involves
  2327. 1:28:36multiplying each methods rating with the
  2328. 1:28:38factor weightage and adding all the
  2329. 1:28:40multiplied values of the column that is
  2330. 1:28:43for telephone survey the rating is
  2331. 1:28:45multiplied with factors rating
  2332. 1:28:48eight multiplied by twelve plus eight
  2333. 1:28:50multiplied by six plus three multiplied
  2334. 1:28:53by twenty plus five multiplied by five
  2335. 1:28:57plus three multiplied by five plus seven
  2336. 1:29:00multiplied by fifteen plus one
  2337. 1:29:03multiplied by ten plus seven multiplied
  2338. 1:29:06by three plus zero multiplied by two
  2339. 1:29:09plus three multiplied by two plus one
  2340. 1:29:13multiplied by ten plus seven multiplied
  2341. 1:29:16by five plus eight multiplied by five
  2342. 1:29:20and the total of this is four hundred
  2343. 1:29:22seventy one in a similar way calculate
  2344. 1:29:26the total value for the remaining two
  2345. 1:29:28methods
  2346. 1:29:29the total of other two methods are 744
  2347. 1:29:32and 522 respectively looking at the
  2348. 1:29:36overall total of the methods 744 is the
  2349. 1:29:39highest
  2350. 1:29:40hence web survey is the best method for
  2351. 1:29:43the organization to use for data
  2352. 1:29:45collection
  2353. 1:29:46let us look at the pros and cons of
  2354. 1:29:48customer complaints data in the next
  2355. 1:29:50screen
  2356. 1:29:52there are pros and cons in gathering
  2357. 1:29:54information from customer complaints
  2358. 1:29:56advantages include availability of
  2359. 1:29:58specific feedback directly from the
  2360. 1:30:00customer
  2361. 1:30:01and ease in responding appropriately to
  2362. 1:30:04every customer on the contrary feedback
  2363. 1:30:07in this method does not provide an
  2364. 1:30:09adequate sample size and may lead to
  2365. 1:30:11processed changes based on one or two
  2366. 1:30:14inputs from the customer
  2367. 1:30:16the next screen will discuss the
  2368. 1:30:17difference between product complaint and
  2369. 1:30:19expedited service request
  2370. 1:30:24product complaints and expedited service
  2371. 1:30:26requests can act as inputs to the
  2372. 1:30:28company for improving their process
  2373. 1:30:31these details address the needs of the
  2374. 1:30:33customer in an indirect way
  2375. 1:30:35a product complaint means that the
  2376. 1:30:37customer is not happy with the product
  2377. 1:30:39that he has purchased from the company
  2378. 1:30:41an expedited service request means a
  2379. 1:30:44service request is being rushed if the
  2380. 1:30:47customer requires the items immediately
  2381. 1:30:49then an expedited service request is
  2382. 1:30:52raised from the customer and the
  2383. 1:30:54organization tries to fulfill it to
  2384. 1:30:56please the customer
  2385. 1:30:58product complaint implies that a product
  2386. 1:31:00is not meeting customers specification
  2387. 1:31:02hence it has to be improved
  2388. 1:31:04expedited service request implies that
  2389. 1:31:07service timeliness are not meeting
  2390. 1:31:09customer requirements hence service has
  2391. 1:31:11to be improved
  2392. 1:31:13product complaint also implies that the
  2393. 1:31:15customer needs for product are not
  2394. 1:31:17completely identified whereas expedited
  2395. 1:31:20service request implies that the
  2396. 1:31:22customer timings need to be recalculated
  2397. 1:31:25let us discuss the importance and
  2398. 1:31:28urgency of these inputs in the next
  2399. 1:31:30screen
  2400. 1:31:33the table shows the importance and
  2401. 1:31:35urgency of different kinds of input
  2402. 1:31:38to select the best methods the criteria
  2403. 1:31:40or the factors which are important to
  2404. 1:31:42the organization are listed
  2405. 1:31:45the criteria are the factors based on
  2406. 1:31:46which organization is going to make
  2407. 1:31:48decisions
  2408. 1:31:50these factors are then given weightage
  2409. 1:31:52based on the importance of each factor
  2410. 1:31:53in decision making
  2411. 1:31:55as seen cost involved and identification
  2412. 1:31:58of customer need are the most important
  2413. 1:32:01criteria for which the weightage given
  2414. 1:32:03is 15 and the list follows
  2415. 1:32:06time consumption and compiling and
  2416. 1:32:08analyzing data are the factors which
  2417. 1:32:10have the least impact on the decision of
  2418. 1:32:12selecting the methods for data
  2419. 1:32:13collection
  2420. 1:32:15each method is rated between 1 and 10
  2421. 1:32:17based on its impact of the listed
  2422. 1:32:19factors with 10 being highly favorable
  2423. 1:32:22to the organization and one being least
  2424. 1:32:24favorable to the organization
  2425. 1:32:27after reading all the methods with the
  2426. 1:32:29factors listed the summer total is
  2427. 1:32:31calculated
  2428. 1:32:32calculation of the total is derived by
  2429. 1:32:34multiplying each methods rating with the
  2430. 1:32:36factor weightage and adding all the
  2431. 1:32:38multiplied values that is for product
  2432. 1:32:41complaint the rating is multiplied with
  2433. 1:32:43the factors rating
  2434. 1:32:45eight multiplied by fifteen plus four
  2435. 1:32:47multiplied by fifteen plus three
  2436. 1:32:50multiplied by two plus one multiplied by
  2437. 1:32:53ten plus one multiplied by ten plus one
  2438. 1:32:56multiplied by ten plus one multiplied by
  2439. 1:33:00eight plus one multiplied by ten plus
  2440. 1:33:03four multiplied by two plus one
  2441. 1:33:05multiplied by eight plus one multiplied
  2442. 1:33:08by ten
  2443. 1:33:09and the total of this is two hundred
  2444. 1:33:11sixty
  2445. 1:33:12in the similar way calculate the total
  2446. 1:33:15value for expedited service request
  2447. 1:33:18the total of expedited service request
  2448. 1:33:20is eight hundred seventeen and hence it
  2449. 1:33:22is effective to the organization
  2450. 1:33:25let us discuss the key elements of data
  2451. 1:33:27collection tools in the next screen
  2452. 1:33:31data collection tools will be selected
  2453. 1:33:33based on the type of data to be
  2454. 1:33:35collected
  2455. 1:33:36the key elements that make these tools
  2456. 1:33:38effective are as follows
  2457. 1:33:40data is collected directly from the
  2458. 1:33:42primary source or customer hence there
  2459. 1:33:45is no scope for miscommunication or loss
  2460. 1:33:47of information
  2461. 1:33:49data is collected exclusively for the
  2462. 1:33:51stated purpose
  2463. 1:33:53hence data is highly reliable
  2464. 1:33:55the data is captured is after
  2465. 1:33:57understanding the organizational purpose
  2466. 1:34:00this makes the data exclusively relevant
  2467. 1:34:02and serves the purpose of the
  2468. 1:34:04organization
  2469. 1:34:05data is collected instantaneously when
  2470. 1:34:08there is a requirement
  2471. 1:34:10this ensures that the data is up to date
  2472. 1:34:12hence the data is valid
  2473. 1:34:14the tools accurately define customer
  2474. 1:34:17requirements the customer requirements
  2475. 1:34:19could be current needs or improvement to
  2476. 1:34:21the product or service that they are
  2477. 1:34:23currently using
  2478. 1:34:25the tools help to get enough information
  2479. 1:34:26about customer requirement through which
  2480. 1:34:29the process for improving or creating
  2481. 1:34:31the product or service that the customer
  2482. 1:34:33requires can be developed
  2483. 1:34:35in the next screen we will discuss how
  2484. 1:34:37the collected data can be reviewed
  2485. 1:34:41collated data must be reviewed to
  2486. 1:34:43eliminate vagueness ambiguity and any
  2487. 1:34:45unintended bias
  2488. 1:34:47nutra worldwide buys laptops for its
  2489. 1:34:50employees from a company that is into
  2490. 1:34:52manufacture and sales of laptops
  2491. 1:34:54the company also provides servicing and
  2492. 1:34:56repairs for their products to the
  2493. 1:34:58customers
  2494. 1:34:59to understand the level of customer
  2495. 1:35:01satisfaction in neutral worldwide and to
  2496. 1:35:04improve its process the laptop company
  2497. 1:35:06is conducting a survey
  2498. 1:35:08the questionnaire which was prepared
  2499. 1:35:10initially questionnaire before review
  2500. 1:35:13had questions that led to ambiguity
  2501. 1:35:15vagueness and unintended bias
  2502. 1:35:18let us look at each item on the survey
  2503. 1:35:21to understand the level of usage of the
  2504. 1:35:24laptop and to know their customer better
  2505. 1:35:27the survey is raising a question related
  2506. 1:35:29to the occupation of the customer
  2507. 1:35:31it gives the option of student or
  2508. 1:35:33professional
  2509. 1:35:34but with this low amount of information
  2510. 1:35:36the company is neither able to gather
  2511. 1:35:38the information nor will the given
  2512. 1:35:40option cover the entire possible
  2513. 1:35:42occupation in the market
  2514. 1:35:44including an option of other please
  2515. 1:35:46specify would help the customer to
  2516. 1:35:48choose and provide the information if he
  2517. 1:35:51does not belong to one of the two given
  2518. 1:35:53groups
  2519. 1:35:54hence the same is added in the review so
  2520. 1:35:57that the customer will not be in any
  2521. 1:35:59ambiguity while filling the
  2522. 1:36:01questionnaire
  2523. 1:36:02the question whether the sales executive
  2524. 1:36:04was supportive with an option of yes or
  2525. 1:36:06no
  2526. 1:36:07is a question which leads again to
  2527. 1:36:09ambiguity and unintended bias
  2528. 1:36:12the customer might be partially happy or
  2529. 1:36:15partially not happy
  2530. 1:36:17but the choice does not let them inform
  2531. 1:36:19their exact feeling
  2532. 1:36:21if the customer selects no as the option
  2533. 1:36:23then the company does not get enough
  2534. 1:36:25information to understand where their
  2535. 1:36:27sales executive went wrong
  2536. 1:36:29hence in the reviewed questionnaire the
  2537. 1:36:31customer is asked to rate the qualities
  2538. 1:36:33of their sales executive which will
  2539. 1:36:35provide better data to the company in
  2540. 1:36:37order to improve the process
  2541. 1:36:40next we will discuss a technique named
  2542. 1:36:42voice of customer
  2543. 1:36:46the voice of customer is a technique to
  2544. 1:36:48organize analyze and profile the
  2545. 1:36:50customer's requirements
  2546. 1:36:52voice of the customer is an expression
  2547. 1:36:54for listening to the external customer
  2548. 1:36:57the table shows the customer
  2549. 1:36:59requirements while purchasing an air
  2550. 1:37:01conditioner
  2551. 1:37:02in all cases the customer is purchasing
  2552. 1:37:04for his or her domestic usage
  2553. 1:37:07each customer is further categorized
  2554. 1:37:09according to his needs and requirements
  2555. 1:37:12when the customer says that he needs a
  2556. 1:37:14silent air conditioner he needs sound
  2557. 1:37:16sleep at night in the bedroom
  2558. 1:37:18this is primarily to remain fresh the
  2559. 1:37:21next morning and to get rid of the noisy
  2560. 1:37:23ceiling fan being used currently
  2561. 1:37:26in case the customer says that he needs
  2562. 1:37:28an efficient ac
  2563. 1:37:29he needs a machine which provides good
  2564. 1:37:31cooling at night in the bedroom this is
  2565. 1:37:34mainly because it gets extremely hot in
  2566. 1:37:36summer
  2567. 1:37:37also he currently uses a ceiling fan
  2568. 1:37:40which is not so effective in summers
  2569. 1:37:43on the other hand when the customer
  2570. 1:37:44wants to buy an ac which is not too
  2571. 1:37:47costly he has limited cash for the
  2572. 1:37:49purchase
  2573. 1:37:50he wants to purchase a low-cost ac
  2574. 1:37:53let us discuss the importance of
  2575. 1:37:55translating customer requirements in the
  2576. 1:37:57next screen
  2577. 1:38:00customer requirement is the data
  2578. 1:38:02collected from customers that gives
  2579. 1:38:04information about what they need or want
  2580. 1:38:06from the process
  2581. 1:38:08customer requirements are often high
  2582. 1:38:10level vague and non-specific
  2583. 1:38:12some customers may give you a set of
  2584. 1:38:14specific requirements to the business
  2585. 1:38:16but broadly customers requirements are a
  2586. 1:38:19reflection of their experience
  2587. 1:38:21customer requirements when translated
  2588. 1:38:24into critical process requirements that
  2589. 1:38:26are specific and measurable are called
  2590. 1:38:28critical to quality ctq factors
  2591. 1:38:32a fully developed ctq has four major
  2592. 1:38:35elements
  2593. 1:38:36output characteristic
  2594. 1:38:38y metric target and specification or
  2595. 1:38:41tolerance limits
  2596. 1:38:43we will discuss the meaning of ctq in
  2597. 1:38:46the next screen
  2598. 1:38:49let us understand what quality function
  2599. 1:38:51deployment is in this screen
  2600. 1:38:54qfd is a process to ensure that the
  2601. 1:38:56customers wants and needs are heard and
  2602. 1:38:59translated into technical
  2603. 1:39:00characteristics
  2604. 1:39:02it is also known as the voice of the
  2605. 1:39:04customer or house of quality
  2606. 1:39:07qfd is a process to understand the
  2607. 1:39:09customer's needs and translate them into
  2608. 1:39:12a set of design and manufacturing
  2609. 1:39:14requirements
  2610. 1:39:15while motivating businesses to focus on
  2611. 1:39:18their customers
  2612. 1:39:20it also helps companies to design and
  2613. 1:39:22build more competitive products in less
  2614. 1:39:24time and lesser costs
  2615. 1:39:26qfd helps in prioritizing customer
  2616. 1:39:29requirements recognizing strengths and
  2617. 1:39:32weaknesses of an organization and
  2618. 1:39:34recognizing areas that need to be worked
  2619. 1:39:36on and areas that need immediate focus
  2620. 1:39:38of efforts
  2621. 1:39:40qfd is carried out by asking relevant
  2622. 1:39:42questions to the customers and
  2623. 1:39:44tabulating them to bring out a set of
  2624. 1:39:46parameters critical to the product
  2625. 1:39:48design
  2626. 1:39:49let us discuss phases of qfd in the next
  2627. 1:39:53screen
  2628. 1:39:55quality function deployment involves
  2629. 1:39:58four phases
  2630. 1:39:59phase one product planning
  2631. 1:40:01in this phase the qfd team translates
  2632. 1:40:04the customer requirements into product
  2633. 1:40:06technical requirements
  2634. 1:40:08phase two
  2635. 1:40:09product design
  2636. 1:40:11in this phase the qfd team translates
  2637. 1:40:14the identified technical requirements
  2638. 1:40:16into key part characteristics or systems
  2639. 1:40:20phase three process planning
  2640. 1:40:23in this phase the qfd team identifies
  2641. 1:40:26the key process operations necessary to
  2642. 1:40:29achieve the identified key part
  2643. 1:40:31characteristics
  2644. 1:40:32phase four
  2645. 1:40:34production planning or process control
  2646. 1:40:37in this phase the qfd team establishes
  2647. 1:40:40process control plans maintenance plans
  2648. 1:40:43and training plans to control operations
  2649. 1:40:46next we will understand the structure of
  2650. 1:40:48qfd
  2651. 1:40:50let us see what happens after completing
  2652. 1:40:53the hoq matrix
  2653. 1:40:55completing one hoq matrix is not the end
  2654. 1:40:58of the qfd process
  2655. 1:41:01the output of the first hoq matrix can
  2656. 1:41:04be the first stage of the second qfd
  2657. 1:41:07phase
  2658. 1:41:08as shown in the image the translation
  2659. 1:41:10process is continued using linked hoq
  2660. 1:41:13type matrices until the production
  2661. 1:41:16planning targets are developed
  2662. 1:41:18let us proceed to the next topic of this
  2663. 1:41:20lesson in the following screen
  2664. 1:41:23in this topic we will discuss the basics
  2665. 1:41:26of project management
  2666. 1:41:28let us start with a discussion on
  2667. 1:41:30problem statement
  2668. 1:41:32every six sigma project targets a
  2669. 1:41:35problem that needs to be resolved the
  2670. 1:41:37first step of project initiation is
  2671. 1:41:39defining the problem statement
  2672. 1:41:42a problem statement needs to describe
  2673. 1:41:44the problem in a clear and concise
  2674. 1:41:46manner
  2675. 1:41:47a problem statement needs to identify
  2676. 1:41:49and specify the observed gap in
  2677. 1:41:51performance
  2678. 1:41:53it should indicate the current
  2679. 1:41:54performance state of a process and the
  2680. 1:41:56required performance state completely
  2681. 1:41:58derived from customer requirements
  2682. 1:42:01a problem statement should be
  2683. 1:42:02quantifiable
  2684. 1:42:04this means it should have specified
  2685. 1:42:06metrics including the respective units
  2686. 1:42:09please note that the problem statement
  2687. 1:42:11cannot contain solutions or causes for
  2688. 1:42:13the problem
  2689. 1:42:15in the next screen we will discuss the
  2690. 1:42:17is or is not template
  2691. 1:42:21the is or is not technique was first
  2692. 1:42:23popularized by kepner trigo incorporated
  2693. 1:42:26in the seventies it is a powerful tool
  2694. 1:42:29that helps define the problem and gather
  2695. 1:42:31required information
  2696. 1:42:33an example of a problem statement of
  2697. 1:42:35paper cup leaks is given on the screen
  2698. 1:42:39the six sigma team has to answer what is
  2699. 1:42:42the problem what isn't the problem where
  2700. 1:42:44is it where isn't it when is it when
  2701. 1:42:48isn't it the problem to what extent is
  2702. 1:42:50it a problem and to what extent isn't it
  2703. 1:42:53a problem
  2704. 1:42:54the information is then used to fill the
  2705. 1:42:56question areas in the is and is not
  2706. 1:42:59issue template in the analysis phase if
  2707. 1:43:02a cause cannot describe the is and the
  2708. 1:43:05is not data then it's not likely the
  2709. 1:43:07main cause
  2710. 1:43:09in the next screen we will list the
  2711. 1:43:10criteria for the project objectives
  2712. 1:43:15the project objectives must meet the
  2713. 1:43:18smarts criteria
  2714. 1:43:19smarts is an acronym of the
  2715. 1:43:21characteristics desired in project
  2716. 1:43:23objectives
  2717. 1:43:25specific
  2718. 1:43:26measurable attainable
  2719. 1:43:28relevant
  2720. 1:43:29time based and stretch
  2721. 1:43:32the project deliverables should be
  2722. 1:43:34specific
  2723. 1:43:35example
  2724. 1:43:36hospitals maintain records of all
  2725. 1:43:38patients
  2726. 1:43:39often a few forms are rejected or missed
  2727. 1:43:43due to errors in recording the id
  2728. 1:43:45numbers
  2729. 1:43:46in this case setting the objective as
  2730. 1:43:49reduce form rejection is very vague
  2731. 1:43:52instead reduce patient id errors in
  2732. 1:43:55recording lab results is specific and
  2733. 1:43:58effectively targets solving the problem
  2734. 1:44:01the project objectives should be
  2735. 1:44:03quantifiable
  2736. 1:44:05example setting the objective as fewer
  2737. 1:44:08form rejections is very vague instead
  2738. 1:44:11reduce patient id errors by 30 percent
  2739. 1:44:14sets a specific goal
  2740. 1:44:16the project objectives should be
  2741. 1:44:18achievable and practical
  2742. 1:44:21the project objectives should be
  2743. 1:44:23relevant to the problem
  2744. 1:44:25the project objectives must specify a
  2745. 1:44:28time frame within which they should be
  2746. 1:44:30delivered
  2747. 1:44:31the project objectives must not be
  2748. 1:44:33easily achievable
  2749. 1:44:35example
  2750. 1:44:36most problems and errors can be reduced
  2751. 1:44:39by creating awareness
  2752. 1:44:41hence the objective must stretch beyond
  2753. 1:44:43the easily attainable state
  2754. 1:44:46in the next screen we will understand
  2755. 1:44:49project documentation
  2756. 1:44:52project documentation refers to creating
  2757. 1:44:55documents to provide details about the
  2758. 1:44:58project
  2759. 1:44:59such documents are used to gain a better
  2760. 1:45:01understanding of the project prevent and
  2761. 1:45:04resolve conflict among stakeholders and
  2762. 1:45:06share plans and status for the project
  2763. 1:45:10documentation of a project is critical
  2764. 1:45:12throughout the project
  2765. 1:45:14some of the benefits achieved through
  2766. 1:45:16project documentation are mentioned
  2767. 1:45:18below
  2768. 1:45:19documentation serves as written proof
  2769. 1:45:22for execution of the project
  2770. 1:45:24it helps teams achieve a common
  2771. 1:45:26understanding of the requirements and
  2772. 1:45:28the status of the project
  2773. 1:45:30it removes personal bias as there is a
  2774. 1:45:33documented history of discussions and
  2775. 1:45:36decisions made for the project
  2776. 1:45:39depending on the nature of the project
  2777. 1:45:41each project produces a number of
  2778. 1:45:43different documents
  2779. 1:45:45some of these documents are the project
  2780. 1:45:47charter project plan and its subsidiary
  2781. 1:45:50plans
  2782. 1:45:52other examples of project documentation
  2783. 1:45:55include project status reports including
  2784. 1:45:57key milestones report risk items and
  2785. 1:46:00pending action items
  2786. 1:46:02the frequency of these reports is
  2787. 1:46:04determined by the need and complexity of
  2788. 1:46:06the project
  2789. 1:46:08these reports are sent to all
  2790. 1:46:09stakeholders to keep them abreast of the
  2791. 1:46:12status of the project
  2792. 1:46:13another example of project documentation
  2793. 1:46:16is the final project report
  2794. 1:46:19this report is prepared at the end of
  2795. 1:46:20the project and includes a summary of
  2796. 1:46:23the complete project
  2797. 1:46:25project storyboard inputs generated from
  2798. 1:46:28statistical tools
  2799. 1:46:29outputs from spreadsheets checklists and
  2800. 1:46:32other miscellaneous documents are also
  2801. 1:46:34classified as project documents
  2802. 1:46:37in the next screen we will understand
  2803. 1:46:40project charter
  2804. 1:46:45we will list the project charter
  2805. 1:46:47sections in this screen
  2806. 1:46:49the major sections of a project charter
  2807. 1:46:52are project name and description
  2808. 1:46:54business requirements
  2809. 1:46:56name of the project manager
  2810. 1:46:58project purpose or justification
  2811. 1:47:00including roi
  2812. 1:47:02stakeholder and stakeholder requirements
  2813. 1:47:05broad timelines major deliverables
  2814. 1:47:08constraints and assumptions and the
  2815. 1:47:10budget summary of the charter
  2816. 1:47:12in the next screen we will understand
  2817. 1:47:14the project plan
  2818. 1:47:18a project plan is the final approved
  2819. 1:47:20document which is used to manage and
  2820. 1:47:23control the various processes within the
  2821. 1:47:25project and ensure its seamless
  2822. 1:47:28execution
  2823. 1:47:30the project manager uses the project
  2824. 1:47:32charter as an input to create a detailed
  2825. 1:47:35project plan
  2826. 1:47:36a project plan comprises various
  2827. 1:47:39sections
  2828. 1:47:40prominent among them being the project
  2829. 1:47:42management approach the scope statement
  2830. 1:47:44the work breakdown structure the cost
  2831. 1:47:47estimates scheduling defining
  2832. 1:47:49performance baselines
  2833. 1:47:51marking major milestones to be achieved
  2834. 1:47:54and the key members and required staff
  2835. 1:47:56personnel for the project
  2836. 1:47:59it also includes the various open and
  2837. 1:48:01pending decisions related to the project
  2838. 1:48:04and the key risks involved
  2839. 1:48:06additionally it also contains references
  2840. 1:48:08to other subsidiary plans for managing
  2841. 1:48:11risk scope schedule etc
  2842. 1:48:14in the next screen we will learn about
  2843. 1:48:16project scope
  2844. 1:48:19we will look at different techniques
  2845. 1:48:21used for interpreting the project scope
  2846. 1:48:23in this screen
  2847. 1:48:25project scope can be interpreted from
  2848. 1:48:27the problem statement and project
  2849. 1:48:29charter using various tools like the
  2850. 1:48:31burrito chart and the cypoc map
  2851. 1:48:34the principle behind the burrito chart
  2852. 1:48:37or the 80 20 principle as we know it is
  2853. 1:48:40a vital few trivial many
  2854. 1:48:43the burrito chart helps the teams to
  2855. 1:48:45trim the scope of the project by
  2856. 1:48:48identifying the causes which have a
  2857. 1:48:50major impact on the outcome of the
  2858. 1:48:52project
  2859. 1:48:53the cypac map is a high level process
  2860. 1:48:56map which helps all team members in
  2861. 1:48:59understanding the process functions in
  2862. 1:49:01terms of addressing questions like who
  2863. 1:49:04are the suppliers
  2864. 1:49:05what are the inputs they provide
  2865. 1:49:08what are the outputs that can be
  2866. 1:49:10obtained and who are the customers
  2867. 1:49:13as discussed earlier cypoc stands for
  2868. 1:49:17suppliers inputs process
  2869. 1:49:20outputs and customers
  2870. 1:49:22in the subsequent screen we will learn
  2871. 1:49:24about process
  2872. 1:49:26maps scipok is a macro level map that
  2873. 1:49:30provides an overview of the business
  2874. 1:49:32process
  2875. 1:49:34where a process map is a micro level
  2876. 1:49:36flow chart that provides an in-depth
  2877. 1:49:39detail of a process
  2878. 1:49:41the process map covers details at all
  2879. 1:49:43levels and provides a walk through the
  2880. 1:49:45current process experience
  2881. 1:49:48the cypac map is used as a basis while
  2882. 1:49:51drawing a process map
  2883. 1:49:53a level one process map provides
  2884. 1:49:55in-depth information
  2885. 1:49:57but the final process map drills further
  2886. 1:50:00into detail
  2887. 1:50:01in the following screen we will
  2888. 1:50:03understand the project metrics
  2889. 1:50:07let us discuss consequential metrics in
  2890. 1:50:09this screen
  2891. 1:50:11consequential metrics measure any
  2892. 1:50:13negative consequences
  2893. 1:50:15these can be business metrics process
  2894. 1:50:18metrics or both
  2895. 1:50:20they measure the negative effects of
  2896. 1:50:22improving the primary or key metrics
  2897. 1:50:26they are used to measure the indemnity
  2898. 1:50:28triggered by any damage in the project
  2899. 1:50:31the inconsistent use of consequential
  2900. 1:50:34metrics can lead to loss of opportunity
  2901. 1:50:37and rework after a project ends
  2902. 1:50:40consequential metrics help to understand
  2903. 1:50:42the cause and effect relationship
  2904. 1:50:45between the primary and the secondary
  2905. 1:50:47metrics and the impact it has on the
  2906. 1:50:50organization
  2907. 1:50:52let us take a look at an example for
  2908. 1:50:54consequential metrics in the next screen
  2909. 1:50:59we will discuss the best practices in
  2910. 1:51:01this screen
  2911. 1:51:02the following are some of the best
  2912. 1:51:04practices of consequential metrics
  2913. 1:51:07setting consequential metrics during the
  2914. 1:51:10measure phase and monitoring these
  2915. 1:51:12metrics after finalizing the project
  2916. 1:51:14will help to analyze whether the link
  2917. 1:51:16between previous primary and secondary
  2918. 1:51:19metrics has been established
  2919. 1:51:22also linking consequential metrics with
  2920. 1:51:24primary metrics and finally linking them
  2921. 1:51:27with secondary metrics provides clarity
  2922. 1:51:30on the impact of these metrics
  2923. 1:51:33assessing and evaluating the cause and
  2924. 1:51:35effect relationship between these
  2925. 1:51:37metrics is helpful to the organization
  2926. 1:51:40as a whole
  2927. 1:51:41in the next screen we will list some
  2928. 1:51:43project planning tools
  2929. 1:51:46the project manager uses various tools
  2930. 1:51:49to plan and control a project
  2931. 1:51:52one of the tools which he uses is the
  2932. 1:51:54burrito chart
  2933. 1:51:56other prominent tools include the
  2934. 1:51:57network diagram the critical path method
  2935. 1:52:01also called cpm
  2936. 1:52:03the program evaluation and review
  2937. 1:52:05technique which is also known as pert
  2938. 1:52:08gantt charts and the work breakdown
  2939. 1:52:11structure also known as wbs
  2940. 1:52:15in the next screen we will discuss
  2941. 1:52:17burrito chart
  2942. 1:52:20pareto chart is a histogram ordered by
  2943. 1:52:22the frequency of occurrence of events
  2944. 1:52:25it is also known as the 80 20 rule or
  2945. 1:52:29vital few trivial many
  2946. 1:52:31it helps project teams to focus on the
  2947. 1:52:33issues which cause the highest number of
  2948. 1:52:35defects or complaints
  2949. 1:52:38to explain further the given chart plots
  2950. 1:52:40all the causes for defects in a product
  2951. 1:52:43or service the values are represented in
  2952. 1:52:46descending order by bars
  2953. 1:52:48and the cumulative total is represented
  2954. 1:52:50by the line
  2955. 1:52:52burrito chart emphasizes that 80 percent
  2956. 1:52:54of the effects come from 20 percent of
  2957. 1:52:57the causes
  2958. 1:52:58thus a burrito chart narrows the scope
  2959. 1:53:00of the project or problem solving by
  2960. 1:53:03identifying the major causes affecting
  2961. 1:53:05quality
  2962. 1:53:06pareto charts are useful only when
  2963. 1:53:08required data is available
  2964. 1:53:11if data is not available then other
  2965. 1:53:13tools such as brainstorming and
  2966. 1:53:16multi-voting should be used to find the
  2967. 1:53:18root cause of any problem
  2968. 1:53:20in the following screen we will continue
  2969. 1:53:22to discuss burrito chart with an example
  2970. 1:53:27a hotel receives plenty of complaints
  2971. 1:53:29from its customers and the hotel manager
  2972. 1:53:32wishes to identify the key areas of
  2973. 1:53:34complaints
  2974. 1:53:35complaints were received in the
  2975. 1:53:37following areas cleaning check-in pool
  2976. 1:53:40timings minibar room service and
  2977. 1:53:43miscellaneous
  2978. 1:53:45cleaning and check-in can be noted as
  2979. 1:53:47areas of concern with 35 and 19
  2980. 1:53:50complaints respectively
  2981. 1:53:53is calculated for each cause of
  2982. 1:53:55complaint and the cumulative is derived
  2983. 1:53:58burrito chart is plotted using this data
  2984. 1:54:01in the next screen we will discuss
  2985. 1:54:03network diagrams
  2986. 1:54:07network diagrams are one of the tools
  2987. 1:54:09used by the project manager for project
  2988. 1:54:12planning
  2989. 1:54:13they are also sometimes referred to as
  2990. 1:54:16arrow diagrams because they use arrows
  2991. 1:54:18to connect activities and represent
  2992. 1:54:20precedence and interdependencies between
  2993. 1:54:23activities of a project
  2994. 1:54:25there are some assumptions that need to
  2995. 1:54:27be made while forming the network
  2996. 1:54:29diagram
  2997. 1:54:30the first assumption is that before a
  2998. 1:54:32new activity begins all pending
  2999. 1:54:35activities have been completed
  3000. 1:54:37the second assumption is that all arrows
  3001. 1:54:40indicate logical precedence
  3002. 1:54:42this means that the direction of the
  3003. 1:54:44arrow represents the sequence that
  3004. 1:54:46activities need to follow
  3005. 1:54:48the last assumption is that a network
  3006. 1:54:51diagram must start from a single event
  3007. 1:54:53and end with a single event
  3008. 1:54:55there cannot be multiple start and end
  3009. 1:54:58points to the network diagram in the
  3010. 1:55:00next screen let us discuss some terms
  3011. 1:55:02related to network diagram
  3012. 1:55:06for the network diagram to calculate the
  3013. 1:55:08total duration of the project the
  3014. 1:55:10project manager needs to define four
  3015. 1:55:13dates for each task
  3016. 1:55:15the first two dates relate to the date
  3017. 1:55:17by when the task can be started
  3018. 1:55:19the first date is early start this is
  3019. 1:55:22the earliest date by when the task can
  3020. 1:55:24start
  3021. 1:55:26the second date is late start this is
  3022. 1:55:28the last date by when the task should
  3023. 1:55:31start the second two dates relate to the
  3024. 1:55:33dates when the task should be complete
  3025. 1:55:36early finish is the earliest date by
  3026. 1:55:38when the task can be completed
  3027. 1:55:41late finish is the last date by when the
  3028. 1:55:44task should be completed
  3029. 1:55:46the duration of the task is calculated
  3030. 1:55:49as the difference between the early
  3031. 1:55:51start and early finish of the task
  3032. 1:55:54the difference between the early start
  3033. 1:55:56and late start of the task is called the
  3034. 1:55:58slack time available for the task
  3035. 1:56:01slack can also be calculated as the
  3036. 1:56:03difference between the early finish and
  3037. 1:56:06late finish dates of the task
  3038. 1:56:08slack time or float time for a task is
  3039. 1:56:11the amount of time the task can be
  3040. 1:56:13delayed before it causes a delay in the
  3041. 1:56:16overall project timeline
  3042. 1:56:19in the next screen we will discuss
  3043. 1:56:21critical path method
  3044. 1:56:24critical path method also known as cpm
  3045. 1:56:28is an important tool used by project
  3046. 1:56:30managers to monitor the progress of the
  3047. 1:56:33project and to ensure that the project
  3048. 1:56:35is on schedule
  3049. 1:56:37the critical path for a project is the
  3050. 1:56:40longest sequence of tasks on the network
  3051. 1:56:42diagram
  3052. 1:56:44the critical path in the given network
  3053. 1:56:45diagram is highlighted in orange
  3054. 1:56:48critical path is characterized by zero
  3055. 1:56:51slack for all tasks on the sequence
  3056. 1:56:54this means that the smallest delay in
  3057. 1:56:56any of the tasks on the critical path
  3058. 1:56:59will cause a delay in the overall
  3059. 1:57:01timeline of the project
  3060. 1:57:03this makes it very important for the
  3061. 1:57:05project manager to closely monitor the
  3062. 1:57:08tasks on the critical path and ensure
  3063. 1:57:10that the tasks go smoothly
  3064. 1:57:13if needed the project manager can divert
  3065. 1:57:15resources from other tasks that are not
  3066. 1:57:18on the critical path to task on the
  3067. 1:57:20critical path to ensure that the project
  3068. 1:57:22is not delayed
  3069. 1:57:24when a project manager removes resources
  3070. 1:57:27from such tasks he needs to ensure that
  3071. 1:57:30the task does not become a critical path
  3072. 1:57:32task because of the reduced number of
  3073. 1:57:34resources
  3074. 1:57:36during the execution of the project
  3075. 1:57:38the critical path can easily shift
  3076. 1:57:40because of multiple factors and hence
  3077. 1:57:43needs to be constantly monitored by the
  3078. 1:57:45project manager
  3079. 1:57:47a complex project can also have multiple
  3080. 1:57:49critical paths in the next screen we
  3081. 1:57:52will discuss project evaluation and
  3082. 1:57:54review technique
  3083. 1:57:57we will understand the concept of risk
  3084. 1:58:00in this screen
  3085. 1:58:02risk is an uncertain event or
  3086. 1:58:04consequence probable of occurring during
  3087. 1:58:07a project
  3088. 1:58:08the main objectives of any project are
  3089. 1:58:11time cost quality and scope
  3090. 1:58:14risk affects at least one of the four
  3091. 1:58:16project objectives
  3092. 1:58:18it is important to understand that risk
  3093. 1:58:20can be both positive as well as negative
  3094. 1:58:24a positive risk enhances the success of
  3095. 1:58:26the project whereas a negative risk is a
  3096. 1:58:29threat to a project's success
  3097. 1:58:32some of the terms used in risk analysis
  3098. 1:58:34and management are risk probability
  3099. 1:58:37issue and risk consequences
  3100. 1:58:40the likelihood that a risk will occur is
  3101. 1:58:42called risk probability
  3102. 1:58:44to assess any risk is to assess the
  3103. 1:58:46probability and impact of the risk
  3104. 1:58:50issue is the occurrence of a risk
  3105. 1:58:53risk consequences are the effects on
  3106. 1:58:55project objectives if there is an
  3107. 1:58:58occurrence of a risk or issue
  3108. 1:59:01in the subsequent screen we will
  3109. 1:59:03understand the process of risk analysis
  3110. 1:59:06and management
  3111. 1:59:09we will list and understand some of the
  3112. 1:59:11elements of risk analysis in this screen
  3113. 1:59:15qualitative method
  3114. 1:59:17qualitative methods like interview
  3115. 1:59:19checklists and brainstorming are used to
  3116. 1:59:21identify potential risks
  3117. 1:59:24quantitative method
  3118. 1:59:26quantitative methods are databased and a
  3119. 1:59:29computer is required to calculate and
  3120. 1:59:31analyze
  3121. 1:59:33these methods are used to evaluate the
  3122. 1:59:35cost time and probabilistic combination
  3123. 1:59:38of individual uncertainties
  3124. 1:59:41feasibility
  3125. 1:59:42feasibility is the study of the project
  3126. 1:59:45risk
  3127. 1:59:46this is usually carried out in the
  3128. 1:59:47beginning of the project when the
  3129. 1:59:49project is most flexible and risks can
  3130. 1:59:52be reduced at a relatively low cost
  3131. 1:59:55it helps in deciding different
  3132. 1:59:57implementing options for the projects
  3133. 2:00:00potential impact
  3134. 2:00:02once the potential risks are identified
  3135. 2:00:05the impact of these on the project is
  3136. 2:00:07determined
  3137. 2:00:08using this data possible solutions for
  3138. 2:00:11the risks are identified
  3139. 2:00:14rpn
  3140. 2:00:15rpn of a failure is the product of its
  3141. 2:00:18probability of occurrence severity and
  3142. 2:00:21detectability
  3143. 2:00:22a failure is prioritized based on its
  3144. 2:00:25rpn value
  3145. 2:00:27a high rpn indicates high risk
  3146. 2:00:30rpn assists to prioritize risks
  3147. 2:00:34avoiding risk
  3148. 2:00:36when potential risks are identified
  3149. 2:00:38their impact in terms of cost time
  3150. 2:00:41resources and objective perspective is
  3151. 2:00:44calculated
  3152. 2:00:45if the impact is huge then avoiding the
  3153. 2:00:48risk is the best option
  3154. 2:00:51mitigating risk
  3155. 2:00:52mitigating is the second option when
  3156. 2:00:54dealing with risks
  3157. 2:00:56the loss that arises from mitigating a
  3158. 2:00:58risk is much less than the loss that
  3159. 2:01:01arises from the temporary avoiding a
  3160. 2:01:03risk
  3161. 2:01:05accepting the risk
  3162. 2:01:07if a risk cannot be avoided or mitigated
  3163. 2:01:10then it has to be accepted
  3164. 2:01:12the risk will be accepted if it doesn't
  3165. 2:01:14greatly impact the cost time and product
  3166. 2:01:16objective
  3167. 2:01:18in the following screen we will discuss
  3168. 2:01:20benefits of risk analysis
  3169. 2:01:24benefits of risk analysis are as follows
  3170. 2:01:27once the risk has been identified it can
  3171. 2:01:30be either mitigated transferred or
  3172. 2:01:33accepted
  3173. 2:01:34when risk is identified in a task slack
  3174. 2:01:37time is provided as a buffer identifying
  3175. 2:01:40risks also helps in setting up an actual
  3176. 2:01:42timeline for a project
  3177. 2:01:45slack time for an activity in a project
  3178. 2:01:47could be the result of a risk identified
  3179. 2:01:50proactively
  3180. 2:01:51identifying risks helps in setting
  3181. 2:01:54realistic expectations from the project
  3182. 2:01:57by communicating the risk probability
  3183. 2:01:59and consequence to stakeholders
  3184. 2:02:02risk analysis also helps to identify and
  3185. 2:02:05plan contingency activities if the risk
  3186. 2:02:08becomes an issue
  3187. 2:02:10the project team is then well prepared
  3188. 2:02:12to work on the issue thereby reducing
  3189. 2:02:15the impact of the risk
  3190. 2:02:17in the following screen we will take a
  3191. 2:02:19look at the risk assessment matrix
  3192. 2:02:23the potential risks of a project are
  3193. 2:02:25assessed using the risk assessment
  3194. 2:02:27matrix
  3195. 2:02:29it covers potential risk areas like
  3196. 2:02:31project scope team personnel material
  3197. 2:02:35facility and equipment and communication
  3198. 2:02:38each of these areas is assessed in terms
  3199. 2:02:40of risk of loss of money productivity
  3200. 2:02:43resources and customer confidence
  3201. 2:02:46in the subsequent screen we will discuss
  3202. 2:02:49project closure
  3203. 2:02:51by definition a project has a beginning
  3204. 2:02:54and an end
  3205. 2:02:56but without a formal closure process
  3206. 2:02:58project teams can fail to recognize the
  3207. 2:03:01end and then the project can drag on
  3208. 2:03:04sometimes at great expense
  3209. 2:03:06every project requires closure
  3210. 2:03:09for larger complex projects it's a good
  3211. 2:03:11idea to close each major project phase
  3212. 2:03:14for example design code and test
  3213. 2:03:17individually
  3214. 2:03:19project closure ensures that outcomes
  3215. 2:03:22match the stated goals of the project
  3216. 2:03:24customers and stakeholders are happy
  3217. 2:03:26with the results
  3218. 2:03:28critical knowledge is captured
  3219. 2:03:30the team feels a sense of completion
  3220. 2:03:33and project resources are released for
  3221. 2:03:35new projects
  3222. 2:03:37in the next screen we will list the
  3223. 2:03:39goals of a project closure report
  3224. 2:03:43the project closure report is created to
  3225. 2:03:46accomplish the following goals
  3226. 2:03:48review and validate the success of the
  3227. 2:03:50project
  3228. 2:03:52confirm outstanding issues limitations
  3229. 2:03:55and recommendations
  3230. 2:03:57outline tasks and activities
  3231. 2:03:59accomplished to complete the activity
  3232. 2:04:02highlight the best practices for future
  3233. 2:04:04projects
  3234. 2:04:06provide the project report or summary
  3235. 2:04:09provide a project background overview
  3236. 2:04:13summarize the planned activities of a
  3237. 2:04:15project
  3238. 2:04:16evaluate project performance
  3239. 2:04:19provide a synopsis of the process
  3240. 2:04:23generate discussions and recommendations
  3241. 2:04:26generate project closure recommendations
  3242. 2:04:30in the following screen we will list and
  3243. 2:04:33understand project closure activities
  3244. 2:04:37during project closure the project
  3245. 2:04:40manager needs to take care of the
  3246. 2:04:41following activities
  3247. 2:04:43finalize the project documents
  3248. 2:04:46much of a project's documentation is
  3249. 2:04:49created during the life of the project
  3250. 2:04:52document collection and update
  3251. 2:04:53procedures are well established during
  3252. 2:04:55the project lifeline
  3253. 2:04:58capture the project knowledge
  3254. 2:05:00project documents are helpful for future
  3255. 2:05:03projects in troubleshooting the product
  3256. 2:05:05or in a future audit
  3257. 2:05:08set up a project library
  3258. 2:05:10ideally the project library is set up at
  3259. 2:05:13the beginning of the project
  3260. 2:05:15and team members add documents as they
  3261. 2:05:17produce them
  3262. 2:05:19document the project learnings
  3263. 2:05:22project learnings can be captured
  3264. 2:05:23through team meetings meetings with
  3265. 2:05:26stakeholders and sponsor
  3266. 2:05:28and through feedbacks from consultants
  3267. 2:05:30and vendors
  3268. 2:05:32provide knowledge transfer
  3269. 2:05:34the project manager needs to provide a
  3270. 2:05:37summary of the project results to team
  3271. 2:05:39members
  3272. 2:05:40either as a presentation at a meeting or
  3273. 2:05:43as a formal document
  3274. 2:05:45consultants should not be relieved from
  3275. 2:05:47their position until they have
  3276. 2:05:48transferred all the important product
  3277. 2:05:50maintenance knowledge to the team
  3278. 2:05:53get a final sign off
  3279. 2:05:55schedule a meeting with the project
  3280. 2:05:57sponsor and key stakeholders to get
  3281. 2:05:59their final sign off on the project
  3282. 2:06:02close the project office
  3283. 2:06:04if the project team used a project
  3284. 2:06:06management office or a dedicated work
  3285. 2:06:09area
  3286. 2:06:09arrangements need to be made to return
  3287. 2:06:11that space for general use
  3288. 2:06:14recognize and reward
  3289. 2:06:17the project manager has the best
  3290. 2:06:19understanding of which of the team
  3291. 2:06:20members have worked the best have
  3292. 2:06:23transformed themselves with new skills
  3293. 2:06:25and who might be ready for a new level
  3294. 2:06:27of responsibility
  3295. 2:06:29the project manager needs to report to
  3296. 2:06:31the team superiors what each team member
  3297. 2:06:34has brought to the project
  3298. 2:06:36celebrate
  3299. 2:06:38after completion of every project the
  3300. 2:06:40team needs and deserves a celebration
  3301. 2:06:43a team dinner a team outing gift
  3302. 2:06:46certificates or other rewards are minor
  3303. 2:06:48costs that generate a large return in
  3304. 2:06:51terms of morale and job satisfaction
  3305. 2:06:54make a public announcement
  3306. 2:06:57an announcement to the organization is a
  3307. 2:06:59good way to highlight the success of the
  3308. 2:07:01project and its benefits to the company
  3309. 2:07:04conclude
  3310. 2:07:06formal project closure ensures that the
  3311. 2:07:08team has met its objectives satisfied
  3312. 2:07:11the customer
  3313. 2:07:12captured important knowledge and been
  3314. 2:07:14rewarded for their efforts
  3315. 2:07:17let us proceed to the next topic of this
  3316. 2:07:19lesson in the following screen
  3317. 2:07:22in this topic we will discuss management
  3318. 2:07:25and planning tools
  3319. 2:07:26let us start with the discussion on
  3320. 2:07:28affinity diagram in the next screen
  3321. 2:07:32the affinity diagram method is employed
  3322. 2:07:35by an individual or team to solve
  3323. 2:07:37unfamiliar problems it is an effective
  3324. 2:07:40medium where the consensus of the group
  3325. 2:07:43is necessary
  3326. 2:07:44the given affinity diagram is based on
  3327. 2:07:47an organization where the employees are
  3328. 2:07:49not satisfied
  3329. 2:07:51to begin with each member writes down
  3330. 2:07:53ideas and opinions on sticky notes
  3331. 2:07:56each note can have a single idea
  3332. 2:07:59the points which have surfaced during
  3333. 2:08:01the brainstorming session are that the
  3334. 2:08:03workers are unkind
  3335. 2:08:05pay is low
  3336. 2:08:06and it is difficult to survive on the
  3337. 2:08:08pay structure working hours are too long
  3338. 2:08:11etc
  3339. 2:08:12in the next step all the sticky notes
  3340. 2:08:14are pasted on a table or wall
  3341. 2:08:17the sticky papers are arranged according
  3342. 2:08:19to categories or thought patterns
  3343. 2:08:22members happen to arrange their ideas
  3344. 2:08:24based on affinity
  3345. 2:08:26in case a particular idea is good to go
  3346. 2:08:28into more than one category it is
  3347. 2:08:31duplicated and added to several
  3348. 2:08:32categories
  3349. 2:08:34after the arrangement is done
  3350. 2:08:36each category is named with a header
  3351. 2:08:39card
  3352. 2:08:40the header card captures the central
  3353. 2:08:42idea of all the cards in that category
  3354. 2:08:45and draws a boundary around them
  3355. 2:08:48poor compensation combines ideas like
  3356. 2:08:50low pay long working hours and
  3357. 2:08:53complaints about wages
  3358. 2:08:55poor work environment encompasses issues
  3359. 2:08:57like poor lighting
  3360. 2:08:59uncomfortable rooms and stuffy air
  3361. 2:09:02similarly poor relationships prevail in
  3362. 2:09:05the workspace as the workers are unkind
  3363. 2:09:08and there is mutual dislike
  3364. 2:09:11lack of motivation is due to repetitive
  3365. 2:09:13work and no work related challenges
  3366. 2:09:16you can see in the diagram on that slide
  3367. 2:09:19that once all the ideas are grouped to
  3368. 2:09:21the respective header cards
  3369. 2:09:23a diagram is drawn and borders are
  3370. 2:09:25placed around the group of ideas
  3371. 2:09:28thus affinity diagram helps in grouping
  3372. 2:09:31ideas with the common theme
  3373. 2:09:33in the next screen we will discuss the
  3374. 2:09:35interrelationship diagram
  3375. 2:09:40during problem solving the
  3376. 2:09:42inter-relationship diagram technique
  3377. 2:09:45helps in identifying the relationship
  3378. 2:09:47between problems and ideas in complex
  3379. 2:09:50situations
  3380. 2:09:52if the problem is really complex it may
  3381. 2:09:54not be easy to determine the exact
  3382. 2:09:56relationship between ideas
  3383. 2:09:59given inter-relationship diagram is the
  3384. 2:10:02result of a team brainstorming session
  3385. 2:10:05which identified 10 major issues
  3386. 2:10:07involved in developing an organization's
  3387. 2:10:09quality plan
  3388. 2:10:11initially the problem is defined and all
  3389. 2:10:14the members put down their ideas on
  3390. 2:10:16sticky notes
  3391. 2:10:18each note contains only one idea
  3392. 2:10:21all the sticky notes are put on a table
  3393. 2:10:23for a random display
  3394. 2:10:25in the next step the causes or areas of
  3395. 2:10:28concern are identified
  3396. 2:10:31and a cause effect arrangement of cards
  3397. 2:10:33is constructed by drawing an arrow
  3398. 2:10:35between the causes and effects of the
  3399. 2:10:37cause
  3400. 2:10:39this is done until all the ideas on the
  3401. 2:10:41sticky notes are accounted for and made
  3402. 2:10:43a part of the interrelationship diagram
  3403. 2:10:47take a large sheet of paper and
  3404. 2:10:49replicate the cause effect arrangement
  3405. 2:10:51on it
  3406. 2:10:52as depicted in the image a large number
  3407. 2:10:55of outgoing arrows indicate the root
  3408. 2:10:57cause
  3409. 2:10:58whereas a higher number of incoming
  3410. 2:11:01arrows indicates an outcome
  3411. 2:11:03there are as many as six arrows
  3412. 2:11:05originating from lack of quality
  3413. 2:11:07strategy
  3414. 2:11:09this leads us to understand that it is a
  3415. 2:11:11root cause
  3416. 2:11:13on the other hand there are three arrows
  3417. 2:11:15ending with the idea lack of tqm
  3418. 2:11:18commitment by managers
  3419. 2:11:20making it an outcome
  3420. 2:11:22in the next screen we will understand
  3421. 2:11:25the tree diagram
  3422. 2:11:28the tree diagram is a systematic
  3423. 2:11:31approach to outline all the details
  3424. 2:11:32needed to complete a given objective
  3425. 2:11:35in other words it is a method used to
  3426. 2:11:38identify the tasks and methods needed to
  3427. 2:11:40solve a problem and reach a predefined
  3428. 2:11:43goal
  3429. 2:11:44it is mostly used while developing
  3430. 2:11:46actions to execute a solution while
  3431. 2:11:48analyzing processes in detail during the
  3432. 2:11:51evaluation of implementation issues for
  3433. 2:11:54several potential solutions
  3434. 2:11:56and also as a communication tool to
  3435. 2:11:59explain the details of a process to
  3436. 2:12:01others
  3437. 2:12:02the given tree diagram shows the plan of
  3438. 2:12:05a coffee shop trying to set standards
  3439. 2:12:07for the coffee it delivers
  3440. 2:12:10first the objective is noted on a note
  3441. 2:12:12card and placed on the far left side of
  3442. 2:12:14the board
  3443. 2:12:15the basic goal of the coffee shop is to
  3444. 2:12:18provide a delightful cappuccino
  3445. 2:12:20experience
  3446. 2:12:21in the next step the coffee shop needs
  3447. 2:12:24to determine the means required to
  3448. 2:12:25achieve the goal and furnish three
  3449. 2:12:27different solutions
  3450. 2:12:29in other words the answers to the how or
  3451. 2:12:32why questions of the objectives
  3452. 2:12:34in this case the cappuccino needs to be
  3453. 2:12:37at a comfortable temperature
  3454. 2:12:39and it should have strong and pleasing
  3455. 2:12:41coffee aroma with the right amount of
  3456. 2:12:43sweetness
  3457. 2:12:45in the next step the three issues
  3458. 2:12:47mentioned in the second stage are
  3459. 2:12:49addressed at length
  3460. 2:12:50each issue is answered
  3461. 2:12:53by maintaining the espresso and steamed
  3462. 2:12:55milk temperature the cappuccino can be
  3463. 2:12:58served at a palatable temperature
  3464. 2:13:00strong flavored cappuccino can be
  3465. 2:13:02prepared using a good amount of finely
  3466. 2:13:04ground coffee beans
  3467. 2:13:06and a good quality sweetener used in the
  3468. 2:13:08right amount makes a great cappuccino
  3469. 2:13:12thus the tree diagram can be used to
  3470. 2:13:14achieve a goal or define a process
  3471. 2:13:18in the following screen we will discuss
  3472. 2:13:20prioritization matrices
  3473. 2:13:24let us learn about matrix diagram in
  3474. 2:13:26this screen
  3475. 2:13:28matrix diagrams show the relationship
  3476. 2:13:31between objectives and methods results
  3477. 2:13:34and causes
  3478. 2:13:35tasks and people etc
  3479. 2:13:38their objective is to provide
  3480. 2:13:39information about the relationship
  3481. 2:13:42they provide importance of task and
  3482. 2:13:44method elements of the subject
  3483. 2:13:47they also help determine the strength of
  3484. 2:13:49relationships between a grid of rows and
  3485. 2:13:51columns
  3486. 2:13:52they help in organizing a large amount
  3487. 2:13:54of inter-process related activities
  3488. 2:13:58let us discuss various types of matrices
  3489. 2:14:01in the next screen
  3490. 2:14:04let us learn about a process decision
  3491. 2:14:06program chart in this screen
  3492. 2:14:09process decision program chart or the
  3493. 2:14:12pdpc method
  3494. 2:14:14is used to chart the course of events
  3495. 2:14:17from the beginning of a process till the
  3496. 2:14:19goal
  3497. 2:14:20while emphasizing the ability to
  3498. 2:14:22identify the failure of important issues
  3499. 2:14:25on activity plans
  3500. 2:14:27the pdpc helps create appropriate
  3501. 2:14:29contingency plans to limit the number of
  3502. 2:14:32risks involved
  3503. 2:14:34the pdpc is used before implementing a
  3504. 2:14:37plan
  3505. 2:14:38especially when the plan is large and
  3506. 2:14:40complex if the plan must be completed on
  3507. 2:14:43schedule or if the price of failure is
  3508. 2:14:46quite high
  3509. 2:14:48the given process decision program chart
  3510. 2:14:51shows the process which can help in
  3511. 2:14:53securing a contract
  3512. 2:14:55the process starts when the seller
  3513. 2:14:57receives an order request from a
  3514. 2:14:59potential buyer
  3515. 2:15:01this can lead to fixing an appointment
  3516. 2:15:03with the buyer confirming the
  3517. 2:15:05appointment date and meeting the buyer
  3518. 2:15:08if the date is not fixed then buyers
  3519. 2:15:10should be contacted till the meeting is
  3520. 2:15:12confirmed
  3521. 2:15:13without a meeting there is a risk of
  3522. 2:15:15losing the order
  3523. 2:15:17considering an optimistic scenario where
  3524. 2:15:20a meeting is fixed with the buyer
  3525. 2:15:22the seller describes the price of the
  3526. 2:15:24product or service
  3527. 2:15:26if the price is competitive the order is
  3528. 2:15:28secured
  3529. 2:15:30if the price is not competitive the
  3530. 2:15:32seller may have to repeat the bid until
  3531. 2:15:34the buyer agrees and the order is secure
  3532. 2:15:38however the buyer may not agree to a
  3533. 2:15:40revised bid either
  3534. 2:15:42in which case the seller might lose the
  3535. 2:15:44bid
  3536. 2:15:46in such a scenario
  3537. 2:15:47the seller can justify the pricing and
  3538. 2:15:50pursue the buyer to agree to the bid
  3539. 2:15:53it might work and the seller might
  3540. 2:15:55secure the order
  3541. 2:15:57in the next screen we will discuss the
  3542. 2:15:59activity network diagram
  3543. 2:16:03an activity network diagram is used to
  3544. 2:16:06show the time required for solving a
  3545. 2:16:08problem and to identify items that can
  3546. 2:16:10be done in parallel
  3547. 2:16:12it is used in scheduling and monitoring
  3548. 2:16:14tasks within a complex project or
  3549. 2:16:17process with interrelated tasks and
  3550. 2:16:19resources moreover it is also used when
  3551. 2:16:22you know the steps of the project or
  3552. 2:16:24process their sequence and the time
  3553. 2:16:26taken by each of the steps involved
  3554. 2:16:29the original japanese name for this tool
  3555. 2:16:32is arrow diagram
  3556. 2:16:34the given activity network diagram shows
  3557. 2:16:36a house construction plan and identifies
  3558. 2:16:39the factors involved separately
  3559. 2:16:42like the amount of time for each
  3560. 2:16:43operation in one situation the
  3561. 2:16:46relationship of work without time for
  3562. 2:16:48each operation and an operation by
  3563. 2:16:50itself
  3564. 2:16:52the number of days is denoted by d
  3565. 2:16:55so the time taken for an activity like
  3566. 2:16:57foundation to scaffolding takes around
  3567. 2:17:00five days plus four days which is nine
  3568. 2:17:03days in total
  3569. 2:17:05the line joining electrical work and
  3570. 2:17:07interior walls is dotted
  3571. 2:17:10this shows relation between them but
  3572. 2:17:12without any timeline
  3573. 2:17:15basically it means that electrical work
  3574. 2:17:17has to be done before interior walls
  3575. 2:17:20but the time is either not important or
  3576. 2:17:23not available
  3577. 2:17:24let us proceed to the next topic of this
  3578. 2:17:27lesson in the following screen
  3579. 2:17:31in this topic we will introduce business
  3580. 2:17:33results for projects
  3581. 2:17:35let us start with the discussion on
  3582. 2:17:37defect per unit
  3583. 2:17:40we will learn about throughput yield in
  3584. 2:17:42this screen
  3585. 2:17:43throughput yield or tpy
  3586. 2:17:46is the number of acceptable pieces at
  3587. 2:17:48the end of a process divided by the
  3588. 2:17:51number of starting pieces excluding
  3589. 2:17:53scrap and rework
  3590. 2:17:55throughput yield is used to measure a
  3591. 2:17:57single process only
  3592. 2:17:59if the dpu is known tpy can be easily
  3593. 2:18:03calculated as e to the power of the
  3594. 2:18:06negative of dpu
  3595. 2:18:08here e is the mathematical constant and
  3596. 2:18:11has a value of 2.7183
  3597. 2:18:14the expression can also be stated as dpu
  3598. 2:18:18equals the negative of natural logarithm
  3599. 2:18:20e of tpy
  3600. 2:18:23in the next screen we will discuss
  3601. 2:18:25rolled throughput yield
  3602. 2:18:29rolled throughput yield or rty
  3603. 2:18:32is the probability of the entire process
  3604. 2:18:34producing zero defects
  3605. 2:18:37rty is the true measure of process
  3606. 2:18:39efficiency and is considered across
  3607. 2:18:42multiple processes
  3608. 2:18:44it is important as a metric when a
  3609. 2:18:46process has excessive rework
  3610. 2:18:49tdpu is total defects per unit
  3611. 2:18:53and is defined for a set of processes
  3612. 2:18:56when the total defects per unit is known
  3613. 2:18:59rolled throughput yield is calculated
  3614. 2:19:01using the expression e to the power of
  3615. 2:19:04negative of tdpu
  3616. 2:19:07the expression can also be written as
  3617. 2:19:09tdpu
  3618. 2:19:11is equal to negative of natural
  3619. 2:19:13logarithm of rty
  3620. 2:19:15when the defectives are known roll
  3621. 2:19:18through foot yield can be calculated as
  3622. 2:19:20the product of each process's first pass
  3623. 2:19:23yield or fpy
  3624. 2:19:25first pass yield is the number of
  3625. 2:19:27products which pass without any rework
  3626. 2:19:30over the total number of units
  3627. 2:19:32first pass yield is calculated as total
  3628. 2:19:35number of quality products over total
  3629. 2:19:37number of units
  3630. 2:19:39total number of quality products is
  3631. 2:19:41total number of units minus total number
  3632. 2:19:44of defective units
  3633. 2:19:46in the following screen we will
  3634. 2:19:47understand fby and rty with an example
  3635. 2:19:55we will discuss process capability in
  3636. 2:19:58this screen
  3637. 2:19:59process capability or cp
  3638. 2:20:02is defined as the inherent variability
  3639. 2:20:06of a characteristic of a process or a
  3640. 2:20:08product
  3641. 2:20:09in other words it might also mean how
  3642. 2:20:12well a process meets customer
  3643. 2:20:15cp is an indicator of capability of a
  3644. 2:20:18process
  3645. 2:20:19and is expressed as difference of usl
  3646. 2:20:22and lsl divided by product of six sigma
  3647. 2:20:27usl stands for upper specification limit
  3648. 2:20:31lsl is lower specification limit and
  3649. 2:20:34sigma is the standard deviation of a
  3650. 2:20:37process
  3651. 2:20:38the difference between usl and lsl is
  3652. 2:20:42also called the specification with or
  3653. 2:20:45tolerance
  3654. 2:20:46in the following screen we will discuss
  3655. 2:20:49process capability indices
  3656. 2:20:53process capability indices or cpk
  3657. 2:20:56was developed to objectively measure the
  3658. 2:20:59degree to which a process meets or does
  3659. 2:21:01not meet customer requirements
  3660. 2:21:04it was developed to account for the
  3661. 2:21:05position of mean with respect to usl and
  3662. 2:21:09lsl
  3663. 2:21:11to calculate cpk
  3664. 2:21:13the first step is to determine if the
  3665. 2:21:15process mean is closer to the lsl or the
  3666. 2:21:19usl
  3667. 2:21:20if the process mean is closer to lsl
  3668. 2:21:23cpkl is determined
  3669. 2:21:26cpkl is mean minus lsl divided by
  3670. 2:21:30product of 3 and sigma
  3671. 2:21:33if the process mean is closer to usl
  3672. 2:21:36cpku is calculated
  3673. 2:21:39cpku is usl minus mean divided by
  3674. 2:21:43product of three and sigma
  3675. 2:21:46here mean is the process average and
  3676. 2:21:49sigma represents the standard deviation
  3677. 2:21:52if the process mean is equidistant
  3678. 2:21:54either of the specification limit can be
  3679. 2:21:57chosen
  3680. 2:21:58cpk takes up the value of cpku and cpkl
  3681. 2:22:03depending on whichever is the lower
  3682. 2:22:05value
  3683. 2:22:06in the next screen we will understand
  3684. 2:22:08process capability indices with an
  3685. 2:22:11example
  3686. 2:22:13in this screen we will discuss cpk and
  3687. 2:22:16cp interpretations
  3688. 2:22:18a cp value of less than 1 indicates the
  3689. 2:22:21process is not capable
  3690. 2:22:24even if cp is greater than one to
  3691. 2:22:27ascertain if the process really is not
  3692. 2:22:29capable check the cpk value
  3693. 2:22:33a cpk value of less than one indicates
  3694. 2:22:36that the process is definitely not
  3695. 2:22:38capable but might be if cp is greater
  3696. 2:22:41than one and the process mean is at or
  3697. 2:22:44near the midpoint of the tolerance range
  3698. 2:22:47the cpk value will always be less than
  3699. 2:22:50cp
  3700. 2:22:51especially as long as the process mean
  3701. 2:22:54is not at the center of the process
  3702. 2:22:56tolerance range
  3703. 2:22:58non-centering can happen when the
  3704. 2:22:59process has not understood the customer
  3705. 2:23:02expectations clearly or the process is
  3706. 2:23:05complete as soon as the output reaches a
  3707. 2:23:08specific limit
  3708. 2:23:09for example a shirt size of 40 has a
  3709. 2:23:13target chest diameter of 40 inches
  3710. 2:23:16but the process consistently delivers
  3711. 2:23:18shirts with a mean of 41 inches as the
  3712. 2:23:21chest diameter
  3713. 2:23:23a machine stops removing material as
  3714. 2:23:25soon as the measured dimension is within
  3715. 2:23:27specified limit
  3716. 2:23:29let us proceed to the next topic of this
  3717. 2:23:32lesson in the following screen
  3718. 2:23:36in this topic we will discuss team
  3719. 2:23:38dynamics and performance
  3720. 2:23:40let us start with the discussion on team
  3721. 2:23:43stages
  3722. 2:23:45there are five typical stages in the
  3723. 2:23:47team building process
  3724. 2:23:49each team passes through these stages as
  3725. 2:23:51they start and proceed through the
  3726. 2:23:53project
  3727. 2:23:54the five stages in the team building
  3728. 2:23:57process are as follows
  3729. 2:23:59forming storming norming performing and
  3730. 2:24:02adjourning
  3731. 2:24:04in the next screen we will discuss the
  3732. 2:24:06first stage forming
  3733. 2:24:10the first stage in the team building
  3734. 2:24:12process is called the forming stage
  3735. 2:24:14in this stage the team comes together
  3736. 2:24:16and begins to formulate roles and
  3737. 2:24:18responsibilities
  3738. 2:24:20the team leader is identified and he or
  3739. 2:24:22she starts directing the team and
  3740. 2:24:24assigning responsibilities to other team
  3741. 2:24:27members
  3742. 2:24:28most team members at this stage are
  3743. 2:24:31generally enthusiastic and motivated by
  3744. 2:24:33desire to be accepted within the team
  3745. 2:24:36the leader employs a directive style of
  3746. 2:24:38management which includes delegating
  3747. 2:24:41responsibility within the team providing
  3748. 2:24:44a structure to the team and determining
  3749. 2:24:46processes needed for the smooth
  3750. 2:24:48functioning of the team
  3751. 2:24:50toward the end of this phase the team
  3752. 2:24:52should achieve a commitment to the
  3753. 2:24:54project and an acceptance of a common
  3754. 2:24:56purpose
  3755. 2:24:58in the next screen we will discuss the
  3756. 2:25:00second stage storming
  3757. 2:25:03the second phase in the team building
  3758. 2:25:05process is called the storming stage
  3759. 2:25:08as suggested by the name itself in this
  3760. 2:25:11stage conflicts start to arise within
  3761. 2:25:14the team
  3762. 2:25:15team members often struggle over
  3763. 2:25:17responsibilities and control within the
  3764. 2:25:20project
  3765. 2:25:21it is the responsibility of the team
  3766. 2:25:23leader to coach and conciliate the team
  3767. 2:25:26the leader employs a coaching style of
  3768. 2:25:28management which is reflected through
  3769. 2:25:30facilitating change managing conflict
  3770. 2:25:33and mediating understanding between
  3771. 2:25:36different parties
  3772. 2:25:37towards the end of this phase team
  3773. 2:25:40members need to learn to voice
  3774. 2:25:41disagreement openly and constructively
  3775. 2:25:44while staying focused on common
  3776. 2:25:46objectives and areas of agreement
  3777. 2:25:49in the next screen we will discuss the
  3778. 2:25:51third stage norming
  3779. 2:25:54the third stage in the team building
  3780. 2:25:56process is called the norming stage
  3781. 2:26:00in this stage people get along and the
  3782. 2:26:02team develops a unified commitment
  3783. 2:26:03toward the project goal
  3784. 2:26:05the team leader promotes the team and
  3785. 2:26:07participates in the team activities
  3786. 2:26:10team members look to the leader to
  3787. 2:26:12clarify their understanding as some
  3788. 2:26:15leadership roles begin to shift within
  3789. 2:26:17the lower rungs of the group
  3790. 2:26:19the leader employs a participatory style
  3791. 2:26:21of management through facilitating
  3792. 2:26:23change working to build consensus and
  3793. 2:26:26overseeing quality control
  3794. 2:26:28toward the end of this phase team
  3795. 2:26:30members need to accept individual
  3796. 2:26:32responsibilities and workout agreements
  3797. 2:26:35about team procedures
  3798. 2:26:37in the next screen we will discuss the
  3799. 2:26:39fourth stage performing
  3800. 2:26:43the next stage in the team building
  3801. 2:26:45process is called the performing stage
  3802. 2:26:48this is the most productive stage for
  3803. 2:26:50the project team
  3804. 2:26:52in this stage team members manage
  3805. 2:26:54complex tasks and work toward the common
  3806. 2:26:57goals of the project
  3807. 2:26:58the leader employs a supervisory style
  3808. 2:27:01of management by overseeing progress
  3809. 2:27:04rewarding achievement and supervising
  3810. 2:27:06process
  3811. 2:27:07the team leader leads the project on
  3812. 2:27:09more or less an automated mode
  3813. 2:27:12when the project has completed
  3814. 2:27:14successfully or when the end is in sight
  3815. 2:27:17the team moves into the final stage
  3816. 2:27:20in the next screen we will discuss the
  3817. 2:27:23fifth stage adjourning
  3818. 2:27:27the last stage of team building is
  3819. 2:27:29called the adjourning stage
  3820. 2:27:31in this stage the project is winding
  3821. 2:27:33down and the goals are within reach
  3822. 2:27:36the team members are dealing with their
  3823. 2:27:38impending separation from the team
  3824. 2:27:41the team leader provides feedback to the
  3825. 2:27:43team the leader employs a supportive
  3826. 2:27:45style of management by giving feedback
  3827. 2:27:48celebrating accomplishments and
  3828. 2:27:50providing closure
  3829. 2:27:52the team leader needs to adopt a
  3830. 2:27:54different style of leadership at every
  3831. 2:27:56stage
  3832. 2:27:57it is therefore important for a leader
  3833. 2:27:59to understand these stages and identify
  3834. 2:28:02the current stage that a team is in
  3835. 2:28:05the success of the team depends on how
  3836. 2:28:08well the leader can guide them through
  3837. 2:28:10these phases in the next screen we will
  3838. 2:28:13learn about negative dynamics
  3839. 2:28:17team members can exhibit negative
  3840. 2:28:19behavior in more than one way during the
  3841. 2:28:21project life cycle
  3842. 2:28:23this behavior has a negative effect on
  3843. 2:28:26the dynamics of the team
  3844. 2:28:28the first kind of negative participants
  3845. 2:28:31fall in the category of overbearing
  3846. 2:28:33participants
  3847. 2:28:34these participants use their influence
  3848. 2:28:37or expertise to take on a position of
  3849. 2:28:40authority
  3850. 2:28:41discounting contributions from other
  3851. 2:28:43team members
  3852. 2:28:44to cope with such participants team
  3853. 2:28:47leaders must establish ground rules for
  3854. 2:28:49participation and reinforce that the
  3855. 2:28:52group has the right to explore any area
  3856. 2:28:54pertinent to team goals and objectives
  3857. 2:28:58another kind of negative participant is
  3858. 2:29:01often referred to as the dominant
  3859. 2:29:03participant
  3860. 2:29:05these participants take up an excessive
  3861. 2:29:07amount of group time by talking too much
  3862. 2:29:10focusing on trivial concerns and
  3863. 2:29:12otherwise preventing participation by
  3864. 2:29:15others
  3865. 2:29:16team leaders need to be able to control
  3866. 2:29:18dominant participants without inhibiting
  3867. 2:29:21their energy or enthusiasm
  3868. 2:29:24some other participants are reluctant
  3869. 2:29:26participants
  3870. 2:29:28who feel intimidated and are not happy
  3871. 2:29:30with the team process
  3872. 2:29:32owing to their reluctance they miss
  3873. 2:29:34opportunities to bring up data that is
  3874. 2:29:37valuable to the project
  3875. 2:29:39this can often lead to hostility within
  3876. 2:29:41the team
  3877. 2:29:43one way to deal with reluctant
  3878. 2:29:45participants
  3879. 2:29:46is to respond positively and with
  3880. 2:29:49encouragement to any contribution from
  3881. 2:29:51the team member
  3882. 2:29:53teamwork is more than a natural
  3883. 2:29:55consequence of working together
  3884. 2:29:57team management is more than building a
  3885. 2:29:59relationship with individual team
  3886. 2:30:01members
  3887. 2:30:02all teams face group challenges that
  3888. 2:30:05need group based diagnosis and problem
  3889. 2:30:07solving to ensure that negative
  3890. 2:30:09participants are able to contribute and
  3891. 2:30:12perform as part of the team
  3892. 2:30:15in the next screen we will learn about
  3893. 2:30:17group challenges
  3894. 2:30:21six sigma team and their
  3895. 2:30:22responsibilities are described here
  3896. 2:30:25various roles assist the smooth
  3897. 2:30:27execution of a six sigma project
  3898. 2:30:31these roles are required to support the
  3899. 2:30:33project by providing the information and
  3900. 2:30:36resources that are needed to execute the
  3901. 2:30:38project
  3902. 2:30:39the first important member of the six
  3903. 2:30:42sigma team is the executive sponsor
  3904. 2:30:45sponsors are the source or conduit for
  3905. 2:30:48project resources
  3906. 2:30:50and they are usually the recipients of
  3907. 2:30:52the benefits the project will produce
  3908. 2:30:55the sponsor is responsible for setting
  3909. 2:30:57the direction and priorities for the
  3910. 2:30:59organization
  3911. 2:31:01the sponsor may be a functional manager
  3912. 2:31:03or an external customer
  3913. 2:31:06the next important role is that of the
  3914. 2:31:08process owners
  3915. 2:31:10they work with the black belts to
  3916. 2:31:12improve their respective processes
  3917. 2:31:14they provide functional expertise about
  3918. 2:31:17the process to the project
  3919. 2:31:20usually this role is played by the
  3920. 2:31:22functional managers in charge of
  3921. 2:31:24specific processes
  3922. 2:31:26the next role in the project is that of
  3923. 2:31:28the champions
  3924. 2:31:30they are typically upper level managers
  3925. 2:31:32who control and allocate resources to
  3926. 2:31:35promote process improvements
  3927. 2:31:37they ensure the organization is
  3928. 2:31:39providing necessary resources to the
  3929. 2:31:41project
  3930. 2:31:42and the project is fitting into the
  3931. 2:31:44strategic plans of the organization
  3932. 2:31:48the first role related to the execution
  3933. 2:31:50of the project is the role of the master
  3934. 2:31:52black belt
  3935. 2:31:54this role acts as a consultant to team
  3936. 2:31:56leaders and offers expertise in the use
  3937. 2:31:59of six sigma tools and methodologies
  3938. 2:32:02master black belts are experts in six
  3939. 2:32:05sigma statistical tools and are
  3940. 2:32:08qualified to teach high level six sigma
  3941. 2:32:10methodologies and applications
  3942. 2:32:13each master black belt will have
  3943. 2:32:15multiple black belts under him
  3944. 2:32:18black belts are the leaders of
  3945. 2:32:19individual six sigma projects
  3946. 2:32:22they lead project teams and conduct the
  3947. 2:32:25detailed analysis required in six sigma
  3948. 2:32:28methodologies
  3949. 2:32:29black belts act as instructors and
  3950. 2:32:32mentors for green belts
  3951. 2:32:34and educate them in six sigma tools and
  3952. 2:32:37methods they also protect the interests
  3953. 2:32:40of the project by coordinating with
  3954. 2:32:42functional managers
  3955. 2:32:44green belts are trained in six sigma but
  3956. 2:32:47typically lead project teams working in
  3957. 2:32:49their own areas of expertise
  3958. 2:32:52they are focused on the basic six sigma
  3959. 2:32:54tools for acceleration of projects
  3960. 2:32:57green belts work on projects on a
  3961. 2:32:59part-time basis dividing time between
  3962. 2:33:01project and functional responsibilities
  3963. 2:33:05an executive is the person who manages
  3964. 2:33:08and leads the team to ensure smooth
  3965. 2:33:10working of tasks and has the power to
  3966. 2:33:13execute decisions
  3967. 2:33:15a coach takes on a number of roles
  3968. 2:33:18he or she is the person who trains
  3969. 2:33:20mentors teaches and guides the team when
  3970. 2:33:23required
  3971. 2:33:24coach also motivates and builds
  3972. 2:33:26confidence of the members
  3973. 2:33:28a facilitator is a guide for the team or
  3974. 2:33:31group also known as a discussion leader
  3975. 2:33:35facilitators help the group or team to
  3976. 2:33:37understand their common objective and
  3977. 2:33:40plan their activities
  3978. 2:33:42a sponsor is a person who supports the
  3979. 2:33:44event or the project by providing all
  3980. 2:33:47the required resources
  3981. 2:33:49a team member is an individual who
  3982. 2:33:51belongs to a particular project team
  3983. 2:33:54a team member contributes to the
  3984. 2:33:56performance of the team and actively
  3985. 2:33:58participates for fulfillment of the
  3986. 2:34:00project objectives
  3987. 2:34:03the progress achievements and the
  3988. 2:34:05details of the project have to be
  3989. 2:34:07effectively communicated to the team
  3990. 2:34:09management customers and stakeholders
  3991. 2:34:13we will learn about modes of
  3992. 2:34:14communication in the next screen
  3993. 2:34:18let us understand communication within
  3994. 2:34:20the team in this screen
  3995. 2:34:23the purpose of communication within the
  3996. 2:34:25team and the modes of communication used
  3997. 2:34:28are as follows
  3998. 2:34:30meetings and emails are suitable to
  3999. 2:34:32communicate the roles and
  4000. 2:34:33responsibilities of the team members
  4001. 2:34:37meetings memos and emails are used by
  4002. 2:34:39the team to understand the project
  4003. 2:34:41status
  4004. 2:34:43workshops and meetings are conducted to
  4005. 2:34:45identify the outstanding tasks risks and
  4006. 2:34:48their corrective actions
  4007. 2:34:51team meetings assist decision making
  4008. 2:34:54meetings and emails ensure coordination
  4009. 2:34:56and efficient work the next screen will
  4010. 2:34:59focus on communication with stakeholders
  4011. 2:35:04the purpose of communication with
  4012. 2:35:06stakeholders and the modes of
  4013. 2:35:08communication used are as follows
  4014. 2:35:11meeting emails and events are suitable
  4015. 2:35:14to convey project objectives and goals
  4016. 2:35:17to stakeholders
  4017. 2:35:19meetings emails and newsletters assist
  4018. 2:35:22stakeholders in understanding project
  4019. 2:35:24status workshops meetings and events
  4020. 2:35:28help stakeholders to identify the
  4021. 2:35:30adverse effects of a situation
  4022. 2:35:33meetings with stakeholders assist
  4023. 2:35:35decision making process
  4024. 2:35:38in the next screen we will discuss the
  4025. 2:35:40communication technique
  4026. 2:35:42communication techniques can be grouped
  4027. 2:35:45in various ways
  4028. 2:35:47the first grouping of communication
  4029. 2:35:49techniques is based on the direction in
  4030. 2:35:51which communication flows vertical
  4031. 2:35:54communication consists of two subtypes
  4032. 2:35:57namely downward flow of communication
  4033. 2:35:59and upward flow of communication
  4034. 2:36:03in the downward flow of communication
  4035. 2:36:06the managers must pass information and
  4036. 2:36:08give orders and directives to the lower
  4037. 2:36:10levels in the organization
  4038. 2:36:13on the contrary
  4039. 2:36:14upward communication consists of
  4040. 2:36:16information relayed from the bottom or
  4041. 2:36:19grassroot levels to the higher levels of
  4042. 2:36:22the company
  4043. 2:36:23horizontal communication refers to the
  4044. 2:36:26sharing of information across the same
  4045. 2:36:28levels of the organization
  4046. 2:36:31this can be in the form of formal and
  4047. 2:36:33informal communication
  4048. 2:36:36formal communications are official
  4049. 2:36:38company sanctioned methods of
  4050. 2:36:39communicating to the employees
  4051. 2:36:42the grapevine rumor mill etc are some of
  4052. 2:36:45the means of informal communication in
  4053. 2:36:48the organization
  4054. 2:36:50the second grouping of communication
  4055. 2:36:52techniques is based on the usage of
  4056. 2:36:54words
  4057. 2:36:56verbal communication includes use of
  4058. 2:36:58words for communication
  4059. 2:37:00via telephone face to face etc
  4060. 2:37:04non-verbal communication conveys
  4061. 2:37:06messages without the use of words
  4062. 2:37:08through body language facial expressions
  4063. 2:37:11etc
  4064. 2:37:13the last grouping of communication
  4065. 2:37:15techniques
  4066. 2:37:16is based on participation of the people
  4067. 2:37:18involved in communication
  4068. 2:37:21one way communication happens when
  4069. 2:37:23information is relayed from the sender
  4070. 2:37:25to the receiver without the expectation
  4071. 2:37:28of a response like memos and
  4072. 2:37:31announcements
  4073. 2:37:32two-way communication is a method in
  4074. 2:37:34which both parties are involved in the
  4075. 2:37:36exchange of information
  4076. 2:37:39team tools are a part of the team
  4077. 2:37:42dynamics and performance
  4078. 2:37:44the various team tools that are used are
  4079. 2:37:46brainstorming
  4080. 2:37:48nominal group technique and multi-voting
  4081. 2:37:51if getting your learning started is half
  4082. 2:37:53the battle what if you could do that for
  4083. 2:37:55free
  4084. 2:37:56visit skillup by simply learn click on
  4085. 2:37:58the link in the description to know more
  4086. 2:38:01this lesson will cover the details of
  4087. 2:38:03the measure phase
  4088. 2:38:04the key objective of the measure phase
  4089. 2:38:07is to gather as much information as
  4090. 2:38:09possible on the current processes
  4091. 2:38:12this involves three key tasks that is
  4092. 2:38:15creating a detailed process map
  4093. 2:38:17gathering baseline data
  4094. 2:38:20and summarizing and analyzing the data
  4095. 2:38:23let us understand process modeling in
  4096. 2:38:25the following screen
  4097. 2:38:28process modeling refers to the
  4098. 2:38:29visualization of a proposed system
  4099. 2:38:32layout or other change in the process
  4100. 2:38:35process modeling and simulation can
  4101. 2:38:38determine the effectiveness or
  4102. 2:38:39ineffectiveness of a new design or
  4103. 2:38:42process
  4104. 2:38:43they can be done using process mapping
  4105. 2:38:46and flow charts
  4106. 2:38:47we will learn about these in the
  4107. 2:38:49forthcoming screens
  4108. 2:38:51let us understand process mapping in
  4109. 2:38:54this screen
  4110. 2:38:55process mapping refers to a workflow
  4111. 2:38:58diagram which gives a clear
  4112. 2:39:00understanding of the process or a series
  4113. 2:39:02of parallel processes
  4114. 2:39:04it is also known as process charting or
  4115. 2:39:07flow charting
  4116. 2:39:09process mapping can be done either in
  4117. 2:39:11the measure phase or the analyze phase
  4118. 2:39:15the features of process mapping are as
  4119. 2:39:17follows
  4120. 2:39:19process mapping is usually the first
  4121. 2:39:21step in process improvement
  4122. 2:39:24process mapping gives a wider
  4123. 2:39:26perspective of the problems and
  4124. 2:39:28opportunities for process improvement
  4125. 2:39:32it is a systematic way of recording all
  4126. 2:39:34the activities performed
  4127. 2:39:37process mapping can be done by using any
  4128. 2:39:40of the methods like flow charts written
  4129. 2:39:42procedures and detailed work
  4130. 2:39:45instructions
  4131. 2:39:46let us learn about flowchart in the
  4132. 2:39:49following screen
  4133. 2:39:51a flowchart is a pictorial
  4134. 2:39:53representation of all the steps of a
  4135. 2:39:55process in consecutive order
  4136. 2:39:58it is used to plan a project
  4137. 2:40:00document processes and communicate the
  4138. 2:40:03process methodology with others
  4139. 2:40:06there are many symbols used in a
  4140. 2:40:08flowchart and the common symbols are
  4141. 2:40:11shown in the given table
  4142. 2:40:13it is recommended you take a look at the
  4143. 2:40:15symbols and their description for better
  4144. 2:40:17understanding
  4145. 2:40:19click the button to view an example of a
  4146. 2:40:21flowchart
  4147. 2:40:24the given flowchart shows the processes
  4148. 2:40:27involved in software development
  4149. 2:40:29the flowchart starts with the start box
  4150. 2:40:32which connects to the design box
  4151. 2:40:34in a software project a software design
  4152. 2:40:37is followed by coding which is then
  4153. 2:40:39followed by testing
  4154. 2:40:41in the next step there is a check for
  4155. 2:40:43errors
  4156. 2:40:44in case of errors it is evaluated for
  4157. 2:40:47the error type
  4158. 2:40:48if it is a design error it goes back to
  4159. 2:40:51the beginning of the design stage
  4160. 2:40:53if it is not a design error it is then
  4161. 2:40:56routed to the beginning of the coding
  4162. 2:40:58stage
  4163. 2:40:59on the contrary if there are no errors
  4164. 2:41:02the flowchart ends
  4165. 2:41:06let us learn about written procedures in
  4166. 2:41:08this screen
  4167. 2:41:10a written procedure is a step-by-step
  4168. 2:41:12guide to direct the reader through a
  4169. 2:41:14task
  4170. 2:41:15it is used when the process of a routine
  4171. 2:41:18task is lengthy and complex
  4172. 2:41:20and it is essential for everyone to
  4173. 2:41:22strictly follow the rules
  4174. 2:41:24written procedures can also be used when
  4175. 2:41:27you want to know what is going on during
  4176. 2:41:29product or process development phases
  4177. 2:41:32there are a number of benefits of
  4178. 2:41:34documenting procedures
  4179. 2:41:36writing procedures help you avoid
  4180. 2:41:38mistakes and ensure consistency
  4181. 2:41:41they streamline the process and help
  4182. 2:41:44your employees take relevant decisions
  4183. 2:41:46and save a lot of time
  4184. 2:41:49written procedures help in improving
  4185. 2:41:51quality
  4186. 2:41:52they are simple to understand
  4187. 2:41:54as they tend to describe the processes
  4188. 2:41:57at a general level
  4189. 2:41:59in the next screen we will discuss how
  4190. 2:42:01work instructions are helpful in
  4191. 2:42:03understanding the process in detail
  4192. 2:42:07work instructions define how one or more
  4193. 2:42:09activities involved in a procedure
  4194. 2:42:12should be written in a detailed manner
  4195. 2:42:14with the aid of technology or other
  4196. 2:42:16resources like flowcharts
  4197. 2:42:18they provide step-by-step details for a
  4198. 2:42:20sequence of activities organized in a
  4199. 2:42:23logical format so that an employee can
  4200. 2:42:26follow it easily and independently
  4201. 2:42:29for example in the internal audit
  4202. 2:42:31procedure how to fill out the audit
  4203. 2:42:33results report comes under work
  4204. 2:42:35instructions
  4205. 2:42:37selection of the three process mapping
  4206. 2:42:39tools is based on the amount of detail
  4207. 2:42:42involved in the process
  4208. 2:42:44for a less detailed process you can
  4209. 2:42:46select flowchart and for a detailed
  4210. 2:42:48process with lots of instructions you
  4211. 2:42:51can select work instructions
  4212. 2:42:54click the button to view an example of
  4213. 2:42:56work instructions
  4214. 2:42:59this example shows the work instructions
  4215. 2:43:02for shipping electronic instruments
  4216. 2:43:05the company name is nutri worldwide inc
  4217. 2:43:07the instructions are written by brianna
  4218. 2:43:09scott and approved by andrew murphy it
  4219. 2:43:12is a one-page instruction
  4220. 2:43:15the work instructions are documented for
  4221. 2:43:17the shipping of electronic instruments
  4222. 2:43:19by the shipping department
  4223. 2:43:21the scope of the project states that it
  4224. 2:43:23is applicable to shipping operations
  4225. 2:43:26the procedure is divided into three
  4226. 2:43:28broad steps
  4227. 2:43:30as a first step the order for the
  4228. 2:43:32shipment must be prepared
  4229. 2:43:34in this step the shipping person
  4230. 2:43:36receives an order number from the sales
  4231. 2:43:38department through an automatic order
  4232. 2:43:40system
  4233. 2:43:41the quantity of the instrument and its
  4234. 2:43:43card number are looked up from the
  4235. 2:43:45system file and the packaging is done as
  4236. 2:43:48per the instructions on the card
  4237. 2:43:51the next step is packaging
  4238. 2:43:53special packing instructions must be
  4239. 2:43:56checked
  4240. 2:43:57the instruments are then marked as per
  4241. 2:43:59the instructions on the card and packed
  4242. 2:44:01in a special or standard container as
  4243. 2:44:03per the requirement
  4244. 2:44:05the order number is written in the
  4245. 2:44:07shipping system and the packing list and
  4246. 2:44:09shipping documentation are obtained
  4247. 2:44:12finally the quantity of instruments and
  4248. 2:44:15the documents is checked
  4249. 2:44:18let us understand process input and
  4250. 2:44:20output variables in this screen
  4251. 2:44:24any improvement of a process has a few
  4252. 2:44:26prerequisites
  4253. 2:44:28to improve a process the key process
  4254. 2:44:31output variables kpov
  4255. 2:44:34and key process input variables kpiv
  4256. 2:44:38should first be measured
  4257. 2:44:40metrics for key process variables
  4258. 2:44:42include percent defective operation cost
  4259. 2:44:46elapsed time
  4260. 2:44:48backlog quantity and documentation
  4261. 2:44:51errors
  4262. 2:44:52critical variables are best identified
  4263. 2:44:55by the process owners
  4264. 2:44:57process owners know and understand each
  4265. 2:45:00step of a process and are in a better
  4266. 2:45:02position to identify the critical
  4267. 2:45:04variables initially
  4268. 2:45:06once identified the relationship between
  4269. 2:45:09the variables is depicted using tools
  4270. 2:45:11such as cypoc and cause and effect
  4271. 2:45:14matrix
  4272. 2:45:15the process input variables results are
  4273. 2:45:18compared to determine which input
  4274. 2:45:20variables have the greatest effect on
  4275. 2:45:22the output variables
  4276. 2:45:24let us proceed to the next topic of this
  4277. 2:45:27lesson in the following screen
  4278. 2:45:30in this topic we will discuss
  4279. 2:45:32probability and statistics in detail
  4280. 2:45:35let us learn about probability in the
  4281. 2:45:37following screen
  4282. 2:45:38probability refers to the chance of
  4283. 2:45:41something occurring or happening
  4284. 2:45:43an outcome is the result of a single
  4285. 2:45:45trial of an experiment
  4286. 2:45:48suppose there are n possible outcomes
  4287. 2:45:50that are equally likely
  4288. 2:45:52the probability that a specific type of
  4289. 2:45:54event or outcome say f can occur is the
  4290. 2:45:58number of specific outcomes divided by
  4291. 2:46:01the total possible outcomes
  4292. 2:46:03click the button to view an example of
  4293. 2:46:06probability
  4294. 2:46:09in the event of tossing a coin what is
  4295. 2:46:11the probability of the occurrence of
  4296. 2:46:14heads
  4297. 2:46:15a single trial of tossing a coin has two
  4298. 2:46:18outcomes heads and tails
  4299. 2:46:21hence the probability of heads occurring
  4300. 2:46:23is one divided by two the total number
  4301. 2:46:26of outcomes
  4302. 2:46:28let us look at some basic properties of
  4303. 2:46:30probability in this screen
  4304. 2:46:33there are three basic properties of
  4305. 2:46:35probability
  4306. 2:46:36click each property to know more
  4307. 2:46:40property 1 states that the probability
  4308. 2:46:42of an event is always between 0 and 1
  4309. 2:46:45both inclusive
  4310. 2:46:48according to property 2 the probability
  4311. 2:46:51of an event that cannot occur is zero
  4312. 2:46:54in other words an event that cannot
  4313. 2:46:56occur is called an impossible event
  4314. 2:47:01property 3 states that the probability
  4315. 2:47:03of an event that must occur is one
  4316. 2:47:06in other words an event that must occur
  4317. 2:47:09is called a certain event
  4318. 2:47:11if e is an event then the probability of
  4319. 2:47:15its occurrence is given by p of e
  4320. 2:47:18it is also read as the probability of
  4321. 2:47:21event e
  4322. 2:47:24in this screen let us look at some
  4323. 2:47:26common terms used in probability along
  4324. 2:47:28with an example
  4325. 2:47:30the commonly used terms in probability
  4326. 2:47:32are sample space
  4327. 2:47:34venn diagram and event
  4328. 2:47:37sample space is the collection of all
  4329. 2:47:39possible outcomes for a given experiment
  4330. 2:47:42in the coin example discussed earlier
  4331. 2:47:44the sample space consists of one
  4332. 2:47:46instance each of heads and tails
  4333. 2:47:48if two coins are tossed the sample space
  4334. 2:47:51would be four in total a venn diagram
  4335. 2:47:54shows all hypothetically possible
  4336. 2:47:56logical relations between a finite
  4337. 2:47:58collection of sets
  4338. 2:48:00an event is a collection of outcomes for
  4339. 2:48:02an experiment which is any subset of the
  4340. 2:48:05sample space
  4341. 2:48:07click the button to view an example of
  4342. 2:48:09probability
  4343. 2:48:12what is the probability of getting a 3
  4344. 2:48:14followed by two when a dice is thrown
  4345. 2:48:17twice
  4346. 2:48:19when the dice is thrown twice the first
  4347. 2:48:21throw can have any number from one to
  4348. 2:48:23six
  4349. 2:48:25similarly the second throw can also have
  4350. 2:48:27any number from one to six so the total
  4351. 2:48:30sample space is six times six
  4352. 2:48:34that is thirty six
  4353. 2:48:36the event in this case is three followed
  4354. 2:48:38by two
  4355. 2:48:40this can happen in only one way
  4356. 2:48:42so the probability in the question is
  4357. 2:48:45one divided by thirty-six
  4358. 2:48:49let us discuss the basic concepts of
  4359. 2:48:51probability in this screen
  4360. 2:48:54some basic concepts of probability are
  4361. 2:48:57independent event
  4362. 2:48:58dependent event
  4363. 2:49:00mutually exclusive and mutually
  4364. 2:49:03inclusive events
  4365. 2:49:05click each concept to know more
  4366. 2:49:09when the probability of occurrence of an
  4367. 2:49:11event does not affect the probability of
  4368. 2:49:14occurrence of another event
  4369. 2:49:16the two events are said to be
  4370. 2:49:18independent
  4371. 2:49:19suppose you rolled a dice and flipped a
  4372. 2:49:22coin at the same time
  4373. 2:49:24the probability of getting any number on
  4374. 2:49:26the dice in no way influences the
  4375. 2:49:28probability of getting heads or tails on
  4376. 2:49:31the coin
  4377. 2:49:33when the probability of one event
  4378. 2:49:35occurring influences the likelihood of
  4379. 2:49:38the other event the events are said to
  4380. 2:49:40be dependent
  4381. 2:49:43events are said to be mutually exclusive
  4382. 2:49:46if the occurrence of any one of them
  4383. 2:49:48prevents the occurrence of all the
  4384. 2:49:50others in other words only one event can
  4385. 2:49:53occur at a time
  4386. 2:49:55consider an example of flipping a coin
  4387. 2:49:58when you flip a coin you will either get
  4388. 2:50:00heads or tails but not both
  4389. 2:50:03you can add the probabilities of these
  4390. 2:50:05two events to prove they are mutually
  4391. 2:50:08exclusive
  4392. 2:50:10any two events wherein one event cannot
  4393. 2:50:12occur without the other are said to be
  4394. 2:50:15mutually inclusive events
  4395. 2:50:19in this screen let us learn about the
  4396. 2:50:21multiplication rules also known as and
  4397. 2:50:24rules
  4398. 2:50:26the multiplication rules or and rules
  4399. 2:50:29depend on the event dependency
  4400. 2:50:32for independent events that is if two
  4401. 2:50:35events are independent of each other the
  4402. 2:50:37special multiplication rule applies
  4403. 2:50:41for mutually independent events the
  4404. 2:50:43special multiplication rule is as
  4405. 2:50:46follows
  4406. 2:50:47if the events a b c and so on are
  4407. 2:50:51independent of each other
  4408. 2:50:53then the probability of a and b and c
  4409. 2:50:56and so on is equal to the product of
  4410. 2:50:58their individual probabilities
  4411. 2:51:01click the button to view an example of
  4412. 2:51:04this rule
  4413. 2:51:06suppose there are three events which are
  4414. 2:51:08independent of each other such as the
  4415. 2:51:11event of flipping a coin and getting
  4416. 2:51:13heads
  4417. 2:51:14drawing a card and getting an ace and
  4418. 2:51:16throwing a dice and getting a one
  4419. 2:51:19what is the probability of occurrence of
  4420. 2:51:21all these events
  4421. 2:51:23the answer is the probability of a and b
  4422. 2:51:27and c
  4423. 2:51:28is equal to the product of their
  4424. 2:51:30individual probabilities
  4425. 2:51:32which is half multiplied by
  4426. 2:51:34one-thirteenth multiplied by one-sixth
  4427. 2:51:37the result is
  4428. 2:51:390.0064 which is 0.64
  4429. 2:51:44hence there is 0.64 probability of all
  4430. 2:51:49of the events occurring
  4431. 2:51:51we will continue the discussion on
  4432. 2:51:53multiplication rules in this screen
  4433. 2:51:56the multiplication rule for
  4434. 2:51:58non-independent or conditional events
  4435. 2:52:01which is also the general multiplication
  4436. 2:52:03rule is as follows
  4437. 2:52:06if a and b are two events then the
  4438. 2:52:08probability of a and b is equal to the
  4439. 2:52:11product of probability of a and the
  4440. 2:52:13probability of b given a alternatively
  4441. 2:52:17we can say that for any two events their
  4442. 2:52:20joint probability is equal to the
  4443. 2:52:22probability that one of these events
  4444. 2:52:24occurs multiplied with the conditional
  4445. 2:52:27probability of the other event given the
  4446. 2:52:29first event
  4447. 2:52:31click the button to view an example of
  4448. 2:52:33this rule
  4449. 2:52:35a bag contains six golden coins and four
  4450. 2:52:39silver coins
  4451. 2:52:40two coins are drawn without replacement
  4452. 2:52:42from the bag
  4453. 2:52:44what is the probability that both of the
  4454. 2:52:46coins are silver
  4455. 2:52:48let a be the event that the first coin
  4456. 2:52:51is silver and b be the event that the
  4457. 2:52:53second coin is silver there are ten
  4458. 2:52:57coins in the bag
  4459. 2:52:58four of which are silver
  4460. 2:53:00therefore p of a equals four divided by
  4461. 2:53:03ten
  4462. 2:53:05after the first selection there are nine
  4463. 2:53:07coins in the bag
  4464. 2:53:09three of which are silver
  4465. 2:53:11therefore p of b given a equals three
  4466. 2:53:14divided by nine
  4467. 2:53:16therefore based on the rule of
  4468. 2:53:18multiplication
  4469. 2:53:19probability of a intersection b
  4470. 2:53:22equals four divided by ten multiplied by
  4471. 2:53:26three divided by nine
  4472. 2:53:28the answer is twelve divided by ninety
  4473. 2:53:31which is zero point one three three four
  4474. 2:53:34hence there is thirteen percent
  4475. 2:53:35probability that both the coins are
  4476. 2:53:38silver
  4477. 2:53:41in this screen we will look at the
  4478. 2:53:42definitions and formula of permutation
  4479. 2:53:45and combination
  4480. 2:53:47permutation is the total number of ways
  4481. 2:53:50in which a set group or number of things
  4482. 2:53:53can be arranged
  4483. 2:53:54the order matters to a great extent in
  4484. 2:53:57permutation
  4485. 2:53:58the manner in which the objects or
  4486. 2:54:00numbers are arranged will be considered
  4487. 2:54:02in permutation
  4488. 2:54:04the formula for permutation is
  4489. 2:54:07npr equals p of n and r equals n
  4490. 2:54:10factorial divided by n minus r factorial
  4491. 2:54:14where n is the number of objects and r
  4492. 2:54:17is the number of objects taken at a time
  4493. 2:54:20the unordered arrangement of set group
  4494. 2:54:22or number of things is known as
  4495. 2:54:24combination
  4496. 2:54:26the order does not matter in combination
  4497. 2:54:29the formula for combination is ncr
  4498. 2:54:32equals c of n and r equals n factorial
  4499. 2:54:35divided by r factorial multiplied by n
  4500. 2:54:38minus r factorial where n is the number
  4501. 2:54:42of objects and r is the number of
  4502. 2:54:44objects taken at a time
  4503. 2:54:47let us look at an example for
  4504. 2:54:48calculating permutation and combination
  4505. 2:54:51in the following screen
  4506. 2:54:54from a group of ten employees a company
  4507. 2:54:56has to select four for a particular
  4508. 2:54:58project
  4509. 2:55:00in how many ways can the selection
  4510. 2:55:02happen given the following conditions
  4511. 2:55:05when the arrangements of employees needs
  4512. 2:55:07to be different
  4513. 2:55:08when the arrangement of employees need
  4514. 2:55:10not be different
  4515. 2:55:12click the button to know the answer
  4516. 2:55:15in the given example the values of n and
  4517. 2:55:18r are ten and four respectively
  4518. 2:55:21let us consider the first condition
  4519. 2:55:24from a group of ten employees four
  4520. 2:55:27employees need to be selected
  4521. 2:55:29the arrangement needs to be different
  4522. 2:55:32using the permutation formula
  4523. 2:55:34n p r equals p of n and r equals n
  4524. 2:55:38factorial divided by n minus r factorial
  4525. 2:55:4210 p four equals p of ten and four
  4526. 2:55:45equals ten factorial divided by ten
  4527. 2:55:48minus four factorial equals five
  4528. 2:55:50thousand forty
  4529. 2:55:52therefore the four employees can be
  4530. 2:55:54selected in five thousand forty ways
  4531. 2:55:58let us now consider the second condition
  4532. 2:56:01from a group of ten employees four
  4533. 2:56:04employees need to be selected
  4534. 2:56:06the arrangement of employees need not be
  4535. 2:56:09different
  4536. 2:56:10using the combination formula
  4537. 2:56:12n c r equals c of n and r equals n
  4538. 2:56:16factorial divided by r factorial
  4539. 2:56:19multiplied by n minus r factorial
  4540. 2:56:2310 c 4 equals c of ten and four equals
  4541. 2:56:26ten factorial divided by four factorial
  4542. 2:56:29multiplied by ten minus four factorial
  4543. 2:56:32equals two hundred and ten
  4544. 2:56:35therefore the four employees can be
  4545. 2:56:37selected from a group of 10 employees in
  4546. 2:56:40210 different ways
  4547. 2:56:43let us understand the two types of
  4548. 2:56:46statistics in this screen
  4549. 2:56:48statistics refers to the science of
  4550. 2:56:50collection analysis interpretation and
  4551. 2:56:54presentation of data
  4552. 2:56:56in six sigma statistical methods and
  4553. 2:56:58principles are used to measure and
  4554. 2:57:00analyze the process performance and
  4555. 2:57:02improvements
  4556. 2:57:04there are two major types of statistics
  4557. 2:57:07descriptive statistics and inferential
  4558. 2:57:09statistics
  4559. 2:57:11descriptive statistics is also known as
  4560. 2:57:14enumerative statistics and inferential
  4561. 2:57:17statistics is also known as analytical
  4562. 2:57:20statistics
  4563. 2:57:21descriptive statistics include
  4564. 2:57:23organizing summarizing and presenting
  4565. 2:57:25the data in a meaningful way
  4566. 2:57:28whereas inferential statistics includes
  4567. 2:57:31making inferences and drawing
  4568. 2:57:33conclusions from the data
  4569. 2:57:35descriptive statistics describes what's
  4570. 2:57:38going on in the data the main objective
  4571. 2:57:40of inferential statistics is to make
  4572. 2:57:43inferences from the data to more general
  4573. 2:57:45conditions
  4574. 2:57:46histograms pie charts box plots
  4575. 2:57:50frequency distributions and measures of
  4576. 2:57:52central tendency mean median and mode
  4577. 2:57:56are all examples of descriptive
  4578. 2:57:58statistics
  4579. 2:57:59on the other hand examples of
  4580. 2:58:01inferential statistics are hypothesis
  4581. 2:58:03testing scatter diagrams etc
  4582. 2:58:08the main objective of statistical
  4583. 2:58:10inference is to draw conclusions on
  4584. 2:58:13population characteristics based on the
  4585. 2:58:15information available in the sample
  4586. 2:58:18collecting data from a population is not
  4587. 2:58:20always easy especially if the size of
  4588. 2:58:23the population is big
  4589. 2:58:25the easier way is to collect a sample
  4590. 2:58:28from the population and from the sample
  4591. 2:58:30statistic collected make an assessment
  4592. 2:58:33about the population parameter
  4593. 2:58:35click the button to see an example of
  4594. 2:58:38statistical inference
  4595. 2:58:41the management team of a cricket council
  4596. 2:58:43wants to know if the team's performance
  4597. 2:58:45has improved after recruiting a new
  4598. 2:58:47coach
  4599. 2:58:48the management conducts a test to prove
  4600. 2:58:50this statistically
  4601. 2:58:52let us consider y a and y b
  4602. 2:58:55where y a stands for efficiency of coach
  4603. 2:58:59a
  4604. 2:58:59and yb stands for efficiency of coach b
  4605. 2:59:03to conduct the test the basic assumption
  4606. 2:59:06is coach a and coach b are both
  4607. 2:59:09effective
  4608. 2:59:10this basic assumption is known as null
  4609. 2:59:12hypothesis
  4610. 2:59:14here let us assume the status quo is
  4611. 2:59:17null hypothesis hence null hypothesis h
  4612. 2:59:20o can be given by y a equals yb
  4613. 2:59:24the management team also challenges
  4614. 2:59:26their basic assumption by assuming the
  4615. 2:59:29coaches are not equally effective
  4616. 2:59:32this is their alternate hypothesis
  4617. 2:59:35the alternate hypothesis states that the
  4618. 2:59:37efficiencies of the two coaches differ
  4619. 2:59:40if the null hypothesis is proven wrong
  4620. 2:59:42the alternate hypothesis must be right
  4621. 2:59:46hence alternate hypothesis h1 can be
  4622. 2:59:49given y a is not equal to yb
  4623. 2:59:53these hypothesis statements are used in
  4624. 2:59:56a hypothesis test which will be
  4625. 2:59:58discussed in the later part of the
  4626. 3:00:00course
  4627. 3:00:02in this screen we will learn about the
  4628. 3:00:04types of errors
  4629. 3:00:06when collecting data from a population
  4630. 3:00:08as a sample
  4631. 3:00:09and forming a conclusion on the
  4632. 3:00:11population based on the sample you run
  4633. 3:00:13into the risk of committing errors
  4634. 3:00:16there are two possible errors that can
  4635. 3:00:18happen
  4636. 3:00:19type 1 error and type 2 error
  4637. 3:00:22the type 1 error occurs when the null
  4638. 3:00:24hypothesis is rejected when it is in
  4639. 3:00:27fact true
  4640. 3:00:28type 1 error is also known as producer's
  4641. 3:00:31risk
  4642. 3:00:32the chance of committing a type 1 error
  4643. 3:00:35is known as alpha
  4644. 3:00:37alpha or significance level is the
  4645. 3:00:40chance of committing a type one error
  4646. 3:00:42and is typically chosen to be five
  4647. 3:00:44percent
  4648. 3:00:46this means the maximum amount of risk
  4649. 3:00:48you have for committing a type one error
  4650. 3:00:50is five percent
  4651. 3:00:52let us consider the previous example
  4652. 3:00:55arriving at a conclusion that coach b is
  4653. 3:00:58better than coach a when in fact they
  4654. 3:01:00are at the same level is a type one
  4655. 3:01:03error
  4656. 3:01:04the risk you have of committing this
  4657. 3:01:06error is 5
  4658. 3:01:08which means there is a 5 chance your
  4659. 3:01:10experiment can give wrong results the
  4660. 3:01:13type 2 error occurs when the null
  4661. 3:01:15hypothesis is accepted when it is in
  4662. 3:01:18fact false also when you reject the
  4663. 3:01:22alternate hypothesis when it is actually
  4664. 3:01:24true
  4665. 3:01:25you commit a type 2 error
  4666. 3:01:28type 2 error is also referred to as
  4667. 3:01:30consumer's risk
  4668. 3:01:32in comparing the two coaches the coaches
  4669. 3:01:34were actually different in their
  4670. 3:01:36efficiencies but the conclusion was that
  4671. 3:01:38they are the same
  4672. 3:01:40the chance of committing a type 2 error
  4673. 3:01:42is known as beta the maximum chance of
  4674. 3:01:46committing a type 2 error is 20
  4675. 3:01:49in the next screen we will learn about
  4676. 3:01:51central limit theorem
  4677. 3:01:55central limit theorem clt states that
  4678. 3:01:57for a sample size greater than 30 the
  4679. 3:02:00sample mean is very close to the
  4680. 3:02:02population mean
  4681. 3:02:03in simple words the sample mean
  4682. 3:02:05approaches the normal distribution
  4683. 3:02:07for example if you have sample 1 and its
  4684. 3:02:10mean is mean 1 sample 2 and its mean is
  4685. 3:02:14mean 2 and so on
  4686. 3:02:16take the means of mean one mean two etc
  4687. 3:02:19and you will find that it is the same as
  4688. 3:02:21the population mean
  4689. 3:02:23population mean is the average of the
  4690. 3:02:25sample means
  4691. 3:02:26in such cases the standard error of mean
  4692. 3:02:30also known as sem that represents the
  4693. 3:02:32variability between the sample means is
  4694. 3:02:35very less
  4695. 3:02:37the sem is often used to represent the
  4696. 3:02:39standard deviation of the sample
  4697. 3:02:42the formula for sem is population
  4698. 3:02:45standard deviation divided by the square
  4699. 3:02:47root of the sample size
  4700. 3:02:50selecting a sample size also depends on
  4701. 3:02:52the concept called power also known as
  4702. 3:02:55power of the test
  4703. 3:02:57we will cover this concept in detail in
  4704. 3:03:00the later part of the course
  4705. 3:03:02let us look at the graphical
  4706. 3:03:03representation of the central limit
  4707. 3:03:06theorem in the following screen
  4708. 3:03:09the plot of the three numbers 2 three
  4709. 3:03:11and four looks as shown in the graph
  4710. 3:03:14it is interesting to note that the total
  4711. 3:03:16number of times each digit is chosen is
  4712. 3:03:18six
  4713. 3:03:19when the plot of the sample mean of nine
  4714. 3:03:22samples of size two each is drawn
  4715. 3:03:24it looks like the red line which is
  4716. 3:03:26plotted in the figure
  4717. 3:03:28the x-axis shows numbers of the mean
  4718. 3:03:30which are two two point five three and
  4719. 3:03:33four
  4720. 3:03:34on the y-axis the frequency is plotted
  4721. 3:03:37the point at which arrows from number
  4722. 3:03:39two and three converge is the mean of
  4723. 3:03:41two and three
  4724. 3:03:43similarly the point at which arrows from
  4725. 3:03:45two and four converge is the mean of the
  4726. 3:03:47numbers two and four
  4727. 3:03:49let us discuss the concluding points of
  4728. 3:03:51the central limit theorem in the next
  4729. 3:03:53screen
  4730. 3:03:55the central limit theorem concludes that
  4731. 3:03:58the sampling distributions are helpful
  4732. 3:04:00in dealing with non-normal data
  4733. 3:04:02if you take the sample data points from
  4734. 3:04:04a population and plot the distribution
  4735. 3:04:07of the means of the sample you get the
  4736. 3:04:09sampling distribution of the means
  4737. 3:04:12the mean of the sampling distribution
  4738. 3:04:14also known as the mean of means will be
  4739. 3:04:16equal to the population mean
  4740. 3:04:19also the sampling distribution
  4741. 3:04:21approaches normality as the sample size
  4742. 3:04:23increases
  4743. 3:04:25note that clt enables you to draw
  4744. 3:04:28inferences from the sample statistics
  4745. 3:04:30about the population parameters
  4746. 3:04:32this is irrespective of the distribution
  4747. 3:04:35of the population
  4748. 3:04:37clt also becomes the basis for
  4749. 3:04:39calculating confidence interval for
  4750. 3:04:41hypothesis tests as it allows the use of
  4751. 3:04:44a standard normal table
  4752. 3:04:47let us proceed to the next topic of this
  4753. 3:04:49lesson in the following screen
  4754. 3:04:52in this topic we will cover the concept
  4755. 3:04:54of statistical distributions
  4756. 3:04:56let us start with discrete probability
  4757. 3:04:58distribution in the following screen
  4758. 3:05:01discrete probability distribution is
  4759. 3:05:04characterized by the probability mass
  4760. 3:05:06function
  4761. 3:05:07it is important to be familiar with
  4762. 3:05:09discrete distributions while dealing
  4763. 3:05:11with discrete data
  4764. 3:05:13some of the examples of discrete
  4765. 3:05:15probability distribution are binomial
  4766. 3:05:18distribution poisson distribution
  4767. 3:05:20negative binomial distribution geometric
  4768. 3:05:24distribution and hyper geometric
  4769. 3:05:26distribution
  4770. 3:05:28we will focus only on the two most
  4771. 3:05:30useful discrete distributions
  4772. 3:05:33binomial distribution and poisson
  4773. 3:05:35distribution
  4774. 3:05:37like most probability distributions
  4775. 3:05:39these distributions also help in
  4776. 3:05:42predicting the sample behavior that has
  4777. 3:05:44been observed in a population
  4778. 3:05:47let us learn about binomial distribution
  4779. 3:05:49in the following screen
  4780. 3:05:52binomial distribution is a probability
  4781. 3:05:55distribution for discrete data
  4782. 3:05:58named after the swiss mathematician
  4783. 3:06:00jacob bernoulli it is an application of
  4784. 3:06:03popular knowledge to predict the sample
  4785. 3:06:05behavior
  4786. 3:06:06binomial distribution also describes the
  4787. 3:06:09discrete data as a result of a
  4788. 3:06:12particular process like the tossing of a
  4789. 3:06:14coin for a fixed number of times and the
  4790. 3:06:17success or failure in an interview
  4791. 3:06:20a process is known as bernoulli's
  4792. 3:06:22process when the process output has only
  4793. 3:06:25two possible values like defective or
  4794. 3:06:28okay
  4795. 3:06:29pass or fail and yes or no
  4796. 3:06:33binomial distribution is used to deal
  4797. 3:06:35with defective items defect is any
  4798. 3:06:38non-compliance with a specification
  4799. 3:06:41defective is a product or service with
  4800. 3:06:43at least one defect
  4801. 3:06:45binomial distribution is most suitable
  4802. 3:06:48when the sample size is less than 30 and
  4803. 3:06:50less than 10 percent of the population
  4804. 3:06:53it is the percentage of non-defective
  4805. 3:06:55items provided the probability of
  4806. 3:06:58creating a defective item remains the
  4807. 3:07:00same over a period
  4808. 3:07:02let us look at the equation
  4809. 3:07:04the probability of exactly r successes
  4810. 3:07:08out of a sample size of n
  4811. 3:07:10is denoted by p of r
  4812. 3:07:12which is equal to ncr whole multiplied
  4813. 3:07:16by p to the power of r and one minus p
  4814. 3:07:19whole to the power of n minus r
  4815. 3:07:22in the equation b is the probability of
  4816. 3:07:25success
  4817. 3:07:26r is the number of successes desired and
  4818. 3:07:29n is the sample size
  4819. 3:07:32to continue discussing the binomial
  4820. 3:07:34distribution
  4821. 3:07:35let us look at some of its key
  4822. 3:07:37calculations in the following screen
  4823. 3:07:41the mean of a binomial distribution is
  4824. 3:07:44denoted by mio and is given by n
  4825. 3:07:47multiplied by p
  4826. 3:07:49the standard deviation of a binomial
  4827. 3:07:51distribution
  4828. 3:07:52is denoted by sigma which is equal to n
  4829. 3:07:55multiplied by p multiplied by 1 minus p
  4830. 3:08:00the method of calculating factorials say
  4831. 3:08:02factorial of 5 is the product of five
  4832. 3:08:06four three two and one
  4833. 3:08:08which is equal to one hundred twenty
  4834. 3:08:11similarly factorial of four is the
  4835. 3:08:14product of four three two and one
  4836. 3:08:17which is equal to twenty four let us
  4837. 3:08:20look at an example of calculating
  4838. 3:08:22binomial distribution in the next screen
  4839. 3:08:26suppose you wish to know the probability
  4840. 3:08:29of getting heads five times in eight
  4841. 3:08:31coin tosses
  4842. 3:08:33you can use the binomial equation for
  4843. 3:08:35the same
  4844. 3:08:36click the answer button to see how this
  4845. 3:08:38is done
  4846. 3:08:40the tossing of a coin has only two
  4847. 3:08:42outcomes heads and tails
  4848. 3:08:45it means that the probability of each
  4849. 3:08:47outcome is 0.5 and it remains fixed over
  4850. 3:08:50a period of time
  4851. 3:08:52additionally the outcomes are
  4852. 3:08:53statistically independent
  4853. 3:08:56in this case the probability of success
  4854. 3:08:58denoted by p is 0.5 the number of
  4855. 3:09:02successes desired is denoted by r which
  4856. 3:09:04is five and the sample size is denoted
  4857. 3:09:07by n which is eight
  4858. 3:09:09therefore the probability of five heads
  4859. 3:09:12is equal to factorial of eight c r which
  4860. 3:09:15is eight divided by factorial of five
  4861. 3:09:18and factorial of eight minus five whole
  4862. 3:09:21multiplied by zero point five to the
  4863. 3:09:23power of five multiplied by one minus
  4864. 3:09:26zero point five whole to the power of
  4865. 3:09:28eight minus five this calculation gives
  4866. 3:09:31a result of zero point two one eight
  4867. 3:09:34seven
  4868. 3:09:35which is equal to twenty one point eight
  4869. 3:09:37seven percent
  4870. 3:09:39let us learn about poisson distribution
  4871. 3:09:41in this screen
  4872. 3:09:42poisson distribution is named after
  4873. 3:09:44simeone denis on and is also used for
  4874. 3:09:47discrete data
  4875. 3:09:49poisson distribution is an application
  4876. 3:09:52of the population knowledge to predict
  4877. 3:09:54the sample behavior
  4878. 3:09:55it is generally used for describing the
  4879. 3:09:58probability distribution of an event
  4880. 3:10:00with respect to time or space
  4881. 3:10:03some of the characteristics of poisson
  4882. 3:10:05distribution are as follows
  4883. 3:10:07poisson distribution describes the
  4884. 3:10:09discrete data resulting from a process
  4885. 3:10:11like the number of calls received by a
  4886. 3:10:13call center agent or the number of
  4887. 3:10:15accidents at a signal
  4888. 3:10:18unlike binomial distribution which deals
  4889. 3:10:20with binary discrete data possum
  4890. 3:10:22distribution deals with integers which
  4891. 3:10:24can take any value
  4892. 3:10:26poisson distribution is suitable for
  4893. 3:10:28analyzing situations wherein the number
  4894. 3:10:31of trials similar to the sample size in
  4895. 3:10:33binomial distribution is large and tends
  4896. 3:10:37towards infinity
  4897. 3:10:38additionally it is used in situations
  4898. 3:10:41where the probability of success in each
  4899. 3:10:43trial is very small almost tending
  4900. 3:10:46towards zero
  4901. 3:10:47this is the reason why poisson
  4902. 3:10:49distribution is applicable for
  4903. 3:10:51predicting the occurrence of rare events
  4904. 3:10:53like plane crashes car accidents etc and
  4905. 3:10:57is therefore widely used in the
  4906. 3:10:58insurance sector poisson distribution
  4907. 3:11:01can be used for predicting the number of
  4908. 3:11:03defects as well given a low defect
  4909. 3:11:05occurrence rate
  4910. 3:11:07let us look at the formula for
  4911. 3:11:09calculating poisson distribution in the
  4912. 3:11:11next screen
  4913. 3:11:13the poisson distribution for a
  4914. 3:11:15probability of exactly x occurrences is
  4915. 3:11:18given by p of x equals to lambda to the
  4916. 3:11:21power of x multiplied with log e to the
  4917. 3:11:23power of minus lambda whole divided by
  4918. 3:11:26factorial of x
  4919. 3:11:28in this equation lambda is the mean
  4920. 3:11:31number of occurrences during the
  4921. 3:11:32interval
  4922. 3:11:33x is the number of occurrences desired
  4923. 3:11:36and e is the base of natural logarithm
  4924. 3:11:39which is equal to 2.71828
  4925. 3:11:42the mean of the poisson distribution is
  4926. 3:11:45given by the lambda and the standard
  4927. 3:11:47deviation of a poisson distribution is
  4928. 3:11:49given by sigma which is the square root
  4929. 3:11:52of lambda
  4930. 3:11:53let us look at an example to calculate
  4931. 3:11:56poisson distribution in the next screen
  4932. 3:11:59the past records of a road junction
  4933. 3:12:01which is accident prone show a mean
  4934. 3:12:04number of five accidents per week at
  4935. 3:12:06this junction
  4936. 3:12:07assume that the number of accidents
  4937. 3:12:09follows up with song distribution and
  4938. 3:12:12calculate the probability of any number
  4939. 3:12:14of accidents happening in a week
  4940. 3:12:16click the button to know the answer
  4941. 3:12:20given the situation you know that the
  4942. 3:12:22value of lambda or mean is five
  4943. 3:12:25so p of zero that is the probability of
  4944. 3:12:27zero accidents per week is calculated as
  4945. 3:12:30five to the power of zero multiplied by
  4946. 3:12:33e to the power of minus five whole
  4947. 3:12:35divided by factorial of zero
  4948. 3:12:38the answer is zero point zero zero six
  4949. 3:12:42applying the same formula the
  4950. 3:12:44probability of one accident per week is
  4951. 3:12:460.03
  4952. 3:12:48the probability of more than two
  4953. 3:12:50accidents per week is one minus the sum
  4954. 3:12:53of probabilities of zero one and two
  4955. 3:12:56accidents
  4956. 3:12:57which is 0.884
  4957. 3:13:00in other words the probability is 88.4
  4958. 3:13:03percent
  4959. 3:13:05let us learn about normal distribution
  4960. 3:13:07in this screen
  4961. 3:13:09the normal or gaussian distribution is a
  4962. 3:13:11continuous probability distribution
  4963. 3:13:14the normal distribution is represented
  4964. 3:13:16as n and depends on two factors
  4965. 3:13:20me u which stands for mean and sigma
  4966. 3:13:23which gives the standard deviation of
  4967. 3:13:24the data points
  4968. 3:13:26normal distribution normally has a
  4969. 3:13:28higher frequency of values around the
  4970. 3:13:31mean and lesser occurrences away from it
  4971. 3:13:34it is often used as a first
  4972. 3:13:36approximation to describe real valued
  4973. 3:13:38random variables that tend to cluster
  4974. 3:13:40around a single mean value
  4975. 3:13:43the distribution is bell shaped and
  4976. 3:13:45symmetrical the total area under the
  4977. 3:13:47normal curve is one which is p of x
  4978. 3:13:51various types of data such as body
  4979. 3:13:53weight height the output of a
  4980. 3:13:55manufacturing device etc follow the
  4981. 3:13:57normal distribution
  4982. 3:13:59additionally normal distribution is
  4983. 3:14:01continuous and symmetrical with the
  4984. 3:14:03tails asymptotic to the x-axis which
  4985. 3:14:06means they touch the x-axis at infinity
  4986. 3:14:10let us continue to discuss normal
  4987. 3:14:12distribution in the following screen
  4988. 3:14:15in a normal distribution to standardize
  4989. 3:14:17comparisons of dispersion or the
  4990. 3:14:19different measurement units like inches
  4991. 3:14:21meters grams etc
  4992. 3:14:23a standard z variable is used the uses
  4993. 3:14:26of z value are as follows
  4994. 3:14:29while the value of z or the number of
  4995. 3:14:31standard deviations is unique for each
  4996. 3:14:34probability within the normal
  4997. 3:14:36distribution
  4998. 3:14:37it helps in finding probabilities of
  4999. 3:14:39data points anywhere within the
  5000. 3:14:41distribution
  5001. 3:14:42it is dimensionless as well that is it
  5002. 3:14:45has no units such as millimeters liters
  5003. 3:14:48columns etc
  5004. 3:14:50there are different formulas to arrive
  5005. 3:14:52at the normal distribution
  5006. 3:14:53we will focus on one commonly used
  5007. 3:14:56formula for calculating normal
  5008. 3:14:57distribution which is
  5009. 3:15:00z equals y minus mu whole divided by
  5010. 3:15:03sigma
  5011. 3:15:04here z is the number of standard
  5012. 3:15:06deviations between y and the mean
  5013. 3:15:09denoted by mu
  5014. 3:15:11y is the value of the data point in
  5015. 3:15:13concern
  5016. 3:15:14me u is mean of the population or data
  5017. 3:15:16points and sigma is the standard
  5018. 3:15:19deviation of the population or data
  5019. 3:15:21points
  5020. 3:15:22let us look at an example for
  5021. 3:15:24calculating normal distribution in the
  5022. 3:15:26following screen
  5023. 3:15:28suppose the time taken to resolve
  5024. 3:15:31customer problems follows a normal
  5025. 3:15:32distribution with a mean of 250 hours
  5026. 3:15:36and standard deviation of 23 hours
  5027. 3:15:39find the probability of a problem
  5028. 3:15:41resolution taking more than 300 hours
  5029. 3:15:44click the button to know the answer
  5030. 3:15:47in this case y is equal to 300 me u
  5031. 3:15:50equals 250 and sigma equals 23.
  5032. 3:15:54applying the normal distribution formula
  5033. 3:15:57z is equal to 300 minus 250 whole
  5034. 3:16:00divided by 23
  5035. 3:16:02the result is 2.17
  5036. 3:16:05when you look at the normal distribution
  5037. 3:16:07table the z value of 2.17 covers an area
  5038. 3:16:12of
  5039. 3:16:130.98499 under itself this means the
  5040. 3:16:16probability of a problem taking 0 to 300
  5041. 3:16:19hours to be resolved is 98.5 percent and
  5042. 3:16:23therefore the chances of a problem
  5043. 3:16:25resolution taking more than 300 hours is
  5044. 3:16:28point five percent
  5045. 3:16:31let us understand the usage of z table
  5046. 3:16:33in this screen
  5047. 3:16:35the graphical representation of z table
  5048. 3:16:38usage is given here
  5049. 3:16:40the probability of areas under the curve
  5050. 3:16:42is one
  5051. 3:16:43for the actual value one can identify
  5052. 3:16:46the z score by using the z table
  5053. 3:16:49as shown this probability is the area
  5054. 3:16:52under the curve to the left of point
  5055. 3:16:54plus a to zero
  5056. 3:16:57using the actual data when you calculate
  5057. 3:16:59mean and standard deviation and the
  5058. 3:17:02values are 25 and 5 respectively it is
  5059. 3:17:05the normal distribution
  5060. 3:17:07if the same data is standardized to a
  5061. 3:17:10mean value of zero and standard
  5062. 3:17:12deviation value of one
  5063. 3:17:14it is the standard normal distribution
  5064. 3:17:17in the next screen we will take a look
  5065. 3:17:19at the z table
  5066. 3:17:22the z table gives the probability that z
  5067. 3:17:25is between zero and a positive number
  5068. 3:17:28there are different forms of normal
  5069. 3:17:30distribution z tables followed globally
  5070. 3:17:33the most common form of z table with
  5071. 3:17:36positive z scores is shown here
  5072. 3:17:39the value of a called the percentage
  5073. 3:17:41point is given along the borders of the
  5074. 3:17:44table in bold and is to two decimal
  5075. 3:17:47places
  5076. 3:17:48the values in the main table are the
  5077. 3:17:50probabilities that z is between 0 and
  5078. 3:17:53plus a
  5079. 3:17:55note that the values running down the
  5080. 3:17:57table are to one decimal place
  5081. 3:18:00the numbers along the column change only
  5082. 3:18:02for the second decimal place
  5083. 3:18:04let us look at some examples and how to
  5084. 3:18:07use a z table in the following screen
  5085. 3:18:11let us find the value of p of z less
  5086. 3:18:14than zero
  5087. 3:18:15the table is not needed to find the
  5088. 3:18:17answer once we know that the variable z
  5089. 3:18:20takes a value less than or equal to zero
  5090. 3:18:24first the area under the curve is one
  5091. 3:18:26and second the curve is symmetrical
  5092. 3:18:29about z equals zero
  5093. 3:18:31hence there is 0.5 or 50 percent above
  5094. 3:18:35chance of z equals zero and zero point
  5095. 3:18:37five or fifty percent below chance of z
  5096. 3:18:41equals zero
  5097. 3:18:43let us find the value of p of z greater
  5098. 3:18:46than one point one two
  5099. 3:18:48in this case the chance of z is greater
  5100. 3:18:51than a number in this case 1.12
  5101. 3:18:54you can find this by using the following
  5102. 3:18:57fact
  5103. 3:18:58the opposite or complement of an event
  5104. 3:19:00of a is the event of not a
  5105. 3:19:03that is the opposite or complement of
  5106. 3:19:05event a occurring is the event a not
  5107. 3:19:08occurring
  5108. 3:19:10its probability is given by p of not
  5109. 3:19:12equal a equals one minus p of a
  5110. 3:19:16in other words p of z greater than 1.12
  5111. 3:19:19is 1 minus the opposite
  5112. 3:19:21which is p of z lesser than 1.12
  5113. 3:19:25using the table p of z less than 1.12
  5114. 3:19:29equals 0.5 plus p of 0 less than z less
  5115. 3:19:34than 1.12 equals 0.5 plus
  5116. 3:19:380.3686
  5117. 3:19:40which is
  5118. 3:19:410.8686
  5119. 3:19:43hence the answer is p of z greater than
  5120. 3:19:461.12 equals 1 minus
  5121. 3:19:490.8686 which is
  5122. 3:19:520.1314
  5123. 3:19:54note the answer is less than 0.5
  5124. 3:19:58let us find the value of p of z lies
  5125. 3:20:01between 0 and 1.12
  5126. 3:20:04in this case where z falls within an
  5127. 3:20:06interval the probability can be read
  5128. 3:20:08straight off the table
  5129. 3:20:10p of z lies between 0 and 1.12 equals
  5130. 3:20:140.3686
  5131. 3:20:17we will learn about chi-square
  5132. 3:20:18distribution in this screen
  5133. 3:20:21chi-square distribution is also known as
  5134. 3:20:24chi squared or chi-square
  5135. 3:20:26distribution chi squared with k minus 1
  5136. 3:20:29degrees of freedom is the distribution
  5137. 3:20:32of a sum of the squares of k independent
  5138. 3:20:35standard normal random variables
  5139. 3:20:38the chi-square distribution is one of
  5140. 3:20:40the most widely used probability
  5141. 3:20:42distributions in inferential statistics
  5142. 3:20:46it is also known as hypothesis testing
  5143. 3:20:49and the distribution is used in
  5144. 3:20:50hypothesis tests
  5145. 3:20:52when used in hypothesis tests it only
  5146. 3:20:55needs one sample for the test to be
  5147. 3:20:57conducted
  5148. 3:20:58conventionally degree of freedom is k
  5149. 3:21:01minus one
  5150. 3:21:02where k is the sample size
  5151. 3:21:05for example if w x y and z are four
  5152. 3:21:08random variables with standard normal
  5153. 3:21:11distributions
  5154. 3:21:12then the random variable f
  5155. 3:21:15which is the sum of w square x square y
  5156. 3:21:18square and z square has a chi-square
  5157. 3:21:21distribution
  5158. 3:21:22the degrees of the freedom of the
  5159. 3:21:24distribution df equals the number of
  5160. 3:21:26normally distributed variables used
  5161. 3:21:29in this case df is equal to four
  5162. 3:21:33let us look at the formula to calculate
  5163. 3:21:35chi-square distribution in the following
  5164. 3:21:37screen
  5165. 3:21:39chi-square calculated or sigma or the
  5166. 3:21:43chi-square index equals f of o minus f
  5167. 3:21:47of e whole square divided by f of e
  5168. 3:21:50here f of o stands for an observed
  5169. 3:21:53frequency and f of e stands for an
  5170. 3:21:56expected frequency determined through a
  5171. 3:21:58contingency table
  5172. 3:22:00let us understand t distribution in the
  5173. 3:22:03next screen
  5174. 3:22:04the t distribution method is the most
  5175. 3:22:07appropriate method to be used in the
  5176. 3:22:09following situations
  5177. 3:22:11when you have a sample size of less than
  5178. 3:22:1330 when the population standard
  5179. 3:22:16deviation is not known
  5180. 3:22:18when the population is approximately
  5181. 3:22:20normal
  5182. 3:22:21unlike the normal distribution a t
  5183. 3:22:24distribution is lower at the mean and
  5184. 3:22:26higher at the tails as seen in the image
  5185. 3:22:30t distribution is used for hypothesis
  5186. 3:22:32testing also as seen in the image the t
  5187. 3:22:36distribution is symmetrical in shape but
  5188. 3:22:39flatter than the normal distribution
  5189. 3:22:42as the sample size increases the t
  5190. 3:22:45distribution approaches normality
  5191. 3:22:47for every possible sample size or
  5192. 3:22:50degrees of freedom there is a different
  5193. 3:22:53t distribution
  5194. 3:22:54let us learn about f distribution in the
  5195. 3:22:57following screen
  5196. 3:23:00the f distribution is a ratio of two
  5197. 3:23:03chi-square distributions
  5198. 3:23:05a specific f distribution is denoted by
  5199. 3:23:08the ratio of the degrees of freedom for
  5200. 3:23:11the numerator chi-square
  5201. 3:23:13and the degrees of freedom for the
  5202. 3:23:15denominator chi-square
  5203. 3:23:17the f-test is performed to calculate and
  5204. 3:23:20observe if the standard deviations or
  5205. 3:23:23variances of two processes are
  5206. 3:23:25significantly different
  5207. 3:23:27the project teams are usually concerned
  5208. 3:23:30about reducing the process variance
  5209. 3:23:33as per the formula f calculated equals
  5210. 3:23:36s1 square divided by s2 square where s1
  5211. 3:23:40and s2 are the standard deviations of
  5212. 3:23:43the two samples
  5213. 3:23:45if the f calculated is one it implies
  5214. 3:23:48there is no difference in the variance
  5215. 3:23:51if s1 is greater than s2
  5216. 3:23:54then the numerator must be greater than
  5217. 3:23:57the denominator
  5218. 3:23:58in other words df1 equals n1 minus 1 and
  5219. 3:24:03df2 equals n2 minus 1.
  5220. 3:24:07from the f distribution table you can
  5221. 3:24:10easily find out the critical f
  5222. 3:24:12distribution at alpha and the degrees of
  5223. 3:24:14freedom of the samples of two different
  5224. 3:24:17processes df1 and df2
  5225. 3:24:20let us proceed to the next topic of this
  5226. 3:24:23lesson in the following screen
  5227. 3:24:26in this topic we will discuss collecting
  5228. 3:24:28and summarizing data in detail
  5229. 3:24:31let us learn about types of data in the
  5230. 3:24:33following screen
  5231. 3:24:35data is objective information which
  5232. 3:24:38everyone can agree on it is a collection
  5233. 3:24:41of facts from which conclusions may be
  5234. 3:24:43drawn
  5235. 3:24:44the two types of data are attribute data
  5236. 3:24:47and variable data
  5237. 3:24:49click each type to know more
  5238. 3:24:52discrete data is data that can be
  5239. 3:24:54counted and only includes numbers such
  5240. 3:24:57as two forty or thousand fifty
  5241. 3:25:00attribute data is commonly called pass
  5242. 3:25:03fail or good bad data
  5243. 3:25:06attribute or discrete data cannot be
  5244. 3:25:09broken down into a smaller unit
  5245. 3:25:11meaningfully
  5246. 3:25:12it answers questions such as how many
  5247. 3:25:15how often or what type
  5248. 3:25:17some examples of attribute data are
  5249. 3:25:20number of defective products percentage
  5250. 3:25:22of defective products
  5251. 3:25:25frequency at which a machine is repaired
  5252. 3:25:27or the type of award received
  5253. 3:25:32any data that can be measured on a
  5254. 3:25:34continuous scale is continuous or
  5255. 3:25:37variable data
  5256. 3:25:38this type of data answers questions such
  5257. 3:25:41as how long what volume or how far
  5258. 3:25:45examples of continuous data include
  5259. 3:25:48height weight
  5260. 3:25:49time taken to complete a task
  5261. 3:25:52temperature and so on
  5262. 3:25:55let us understand the importance of
  5263. 3:25:56selecting the data type in this screen
  5264. 3:26:00deciding the data type facilitates
  5265. 3:26:02analysis and interpretation
  5266. 3:26:05therefore the first step in the measure
  5267. 3:26:07phase is to determine what type of data
  5268. 3:26:10should be collected
  5269. 3:26:11this can be done by considering the
  5270. 3:26:13following
  5271. 3:26:15the first consideration is to identify
  5272. 3:26:17what is already known
  5273. 3:26:19for this the values already identified
  5274. 3:26:21for the process are listed
  5275. 3:26:24these include critical to quality
  5276. 3:26:26parameters or ctq's
  5277. 3:26:28key process output variables or
  5278. 3:26:31kpovs
  5279. 3:26:33and the key process input variable or
  5280. 3:26:36kpivs
  5281. 3:26:38next to understand how to proceed with
  5282. 3:26:41the data gathered it is necessary to
  5283. 3:26:43determine the data type that fits the
  5284. 3:26:45metrics for the key variables identified
  5285. 3:26:49the question now arises
  5286. 3:26:51why should the data type be identified
  5287. 3:26:54this is important as it enables the
  5288. 3:26:57right set of data to be collected
  5289. 3:27:00analyzed and used to draw inferences
  5290. 3:27:03it is not advisable to convert one type
  5291. 3:27:06of data into another
  5292. 3:27:08converting attribute data to variable
  5293. 3:27:10data is difficult and requires
  5294. 3:27:13assumptions to be made about the process
  5295. 3:27:16it may also require additional data
  5296. 3:27:18gathering including retesting units
  5297. 3:27:21let us look at measurement scales in the
  5298. 3:27:23following screen
  5299. 3:27:26there are four measurement scales
  5300. 3:27:28arranged in the table in increasing
  5301. 3:27:30order of their statistical desirability
  5302. 3:27:33in the nominal scale the data consists
  5303. 3:27:36of only names or categories and there is
  5304. 3:27:38no possibility of ordering
  5305. 3:27:41an example of this type of measurement
  5306. 3:27:43can be a bag of colored balls which
  5307. 3:27:46contains ten green balls five black
  5308. 3:27:49balls eight yellow balls and nine white
  5309. 3:27:52balls
  5310. 3:27:53this is the least informative of all
  5311. 3:27:55scales
  5312. 3:27:56the most appropriate measure of central
  5313. 3:27:58tendency for this scale is mode
  5314. 3:28:01in the ordinal or ranking scale data is
  5315. 3:28:04arranged in order and values can be
  5316. 3:28:06compared with each other
  5317. 3:28:08an example of this scale can be the
  5318. 3:28:10ratings given to different restaurants
  5319. 3:28:13three for a five for b
  5320. 3:28:15two for c and four for d
  5321. 3:28:18the central tendency for this scale is
  5322. 3:28:21median or mode the interval scale is
  5323. 3:28:24used for ranking items in step order
  5324. 3:28:26along a scale of equidistant points
  5325. 3:28:29for example the temperatures of three
  5326. 3:28:32metal rods are 100 degrees 200 degrees
  5327. 3:28:35and 600 degrees fahrenheit respectively
  5328. 3:28:39note that three times 200 degrees is not
  5329. 3:28:42the same as 600 degrees as a temperature
  5330. 3:28:44measurement
  5331. 3:28:46the central tendency here is mean median
  5332. 3:28:49or mode
  5333. 3:28:50mean is used if the data does not have
  5334. 3:28:52any outliers
  5335. 3:28:54the ratio scale represents variable data
  5336. 3:28:57and is measured against a known standard
  5337. 3:28:59or increment
  5338. 3:29:01however this scale also has an absolute
  5339. 3:29:04zero that is no numbers exist below zero
  5340. 3:29:08an example of the ratio scale are
  5341. 3:29:10physical measures where height weight
  5342. 3:29:12and electric charge represent ratio
  5343. 3:29:15scale data
  5344. 3:29:16note that negative length is not
  5345. 3:29:18possible
  5346. 3:29:19again here you would use mean median or
  5347. 3:29:22mode as the central tendency measure
  5348. 3:29:26in the next screen we will learn about
  5349. 3:29:28assuring data accuracy
  5350. 3:29:31to ensure data is accurate sampling
  5351. 3:29:34techniques are used
  5352. 3:29:36sampling is the process act or technique
  5353. 3:29:39of selecting an appropriate test group
  5354. 3:29:41or sample from a larger population
  5355. 3:29:44it is preferable to survey 100 people to
  5356. 3:29:47surveying 10 000 people
  5357. 3:29:50sampling saves the time money and effort
  5358. 3:29:52involved in collecting data
  5359. 3:29:54the three types of sampling techniques
  5360. 3:29:56described here are random sampling
  5361. 3:30:00sequential sampling and stratified
  5362. 3:30:02sampling
  5363. 3:30:03click each type to know more
  5364. 3:30:07random sampling is the technique where a
  5365. 3:30:09group of subjects or a sample for study
  5366. 3:30:12is selected from a larger group or
  5367. 3:30:14population at random
  5368. 3:30:18sequential sampling is similar to
  5369. 3:30:20multiple sampling plans except that it
  5370. 3:30:22can in theory continue indefinitely
  5371. 3:30:26in other words it is a non-probability
  5372. 3:30:28sampling technique wherein the
  5373. 3:30:30researcher picks a single subject or a
  5374. 3:30:33group of subjects in a given time
  5375. 3:30:35interval conducts the study analyzes the
  5376. 3:30:38results and then picks another group of
  5377. 3:30:41subjects if needed and so on
  5378. 3:30:44in stratified sampling the idea is to
  5379. 3:30:47take samples from subgroups of a
  5380. 3:30:49population
  5381. 3:30:51this technique gives an accurate
  5382. 3:30:52estimate of the population parameter
  5383. 3:30:56in this screen we will compare simple
  5384. 3:30:58random sampling with stratified sampling
  5385. 3:31:02simple random sampling is easy to do
  5386. 3:31:05while stratified sampling takes a lot of
  5387. 3:31:07time
  5388. 3:31:08the possibility of simple random
  5389. 3:31:11sampling giving erroneous results is
  5390. 3:31:13very high
  5391. 3:31:15while stratified sampling minimizes the
  5392. 3:31:17chances of error
  5393. 3:31:19simple random sampling doesn't have the
  5394. 3:31:22power to show possible causes of
  5395. 3:31:24variation while stratified sampling if
  5396. 3:31:27done correctly will show assignable
  5397. 3:31:29causes
  5398. 3:31:31in the next screen we will look at the
  5399. 3:31:33check sheet method of collecting data
  5400. 3:31:36the process of collecting data is
  5401. 3:31:38expensive wrongly collected data leading
  5402. 3:31:41to wrong analysis and inferences results
  5403. 3:31:44in resources being wasted
  5404. 3:31:47a check sheet is a structured form
  5405. 3:31:49prepared to collect and analyze data
  5406. 3:31:52it is a generic tool that is relatively
  5407. 3:31:54simple to use and can be adopted for a
  5408. 3:31:57variety of purposes
  5409. 3:31:59check sheets are used when the data can
  5410. 3:32:01be observed and collected repeatedly by
  5411. 3:32:04the same person or at the same location
  5412. 3:32:07they are also used while collecting data
  5413. 3:32:10from a production process
  5414. 3:32:12a common example is calculating the
  5415. 3:32:14number of absentees in a company
  5416. 3:32:17the table shows absentee data collected
  5417. 3:32:20for a week
  5418. 3:32:21we will discuss data coding and its
  5419. 3:32:24advantages in the following screen
  5420. 3:32:27data coding is a process of converting
  5421. 3:32:30and condensing raw data into categories
  5422. 3:32:33and sets so that the data can be used
  5423. 3:32:35for further analysis
  5424. 3:32:37the benefits of data coding are listed
  5425. 3:32:39here
  5426. 3:32:41data coding simplifies the large
  5427. 3:32:43quantity of data that is collected from
  5428. 3:32:45sources
  5429. 3:32:46the large amount of data makes analysis
  5430. 3:32:49and drawing conclusions difficult
  5431. 3:32:51it leads to chaos and ambiguity
  5432. 3:32:54data coding simplifies the data by
  5433. 3:32:56coding it into variables and then
  5434. 3:32:59categorizing these variables
  5435. 3:33:02raw data cannot be easily entered into
  5436. 3:33:04computers for analysis
  5437. 3:33:06data coding is used to convert raw data
  5438. 3:33:09into process data that can be easily fed
  5439. 3:33:12into computing systems for calculation
  5440. 3:33:15and analysis
  5441. 3:33:17coding of data makes it easy to analyze
  5442. 3:33:20the data
  5443. 3:33:21converted data can either be analyzed
  5444. 3:33:23directly or fed into computers
  5445. 3:33:26the analyst can easily draw conclusions
  5446. 3:33:28when all the data is categorized and
  5447. 3:33:31computerized
  5448. 3:33:33data coding also enables organized
  5449. 3:33:35representation of data
  5450. 3:33:37division of data into categories helps
  5451. 3:33:40organize large chunks of information
  5452. 3:33:43thus making analysis and interpretation
  5453. 3:33:45easier data coding also ensures that
  5454. 3:33:48data repetition does not occur and
  5455. 3:33:51duplicate entries are eliminated so that
  5456. 3:33:53the final result is not affected in the
  5457. 3:33:56following screen we will discuss
  5458. 3:33:58measures of central tendency of the
  5459. 3:34:00descriptive statistics in detail
  5460. 3:34:04a measure of central tendency is a
  5461. 3:34:06single value that indicates the central
  5462. 3:34:09point in a set of data and helps in
  5463. 3:34:11identifying data trends the three most
  5464. 3:34:14commonly used measures of the central
  5465. 3:34:17tendency are mean median and mode
  5466. 3:34:21click each measure to know more
  5467. 3:34:24mean is the most common measure of
  5468. 3:34:26central tendency it is the sum of all
  5469. 3:34:29the data values divided by the number of
  5470. 3:34:32data points
  5471. 3:34:33also called arithmetic mean or average
  5472. 3:34:36it is the most widely used measure of
  5473. 3:34:38central tendency
  5474. 3:34:41also known as positional mean median is
  5475. 3:34:44the number present in the middle of the
  5476. 3:34:46data set when the numbers are arranged
  5477. 3:34:48in ascending or descending order
  5478. 3:34:52if the data set has an even number of
  5479. 3:34:54entries then the median is the mean of
  5480. 3:34:56the two middle numbers
  5481. 3:34:59median can also be calculated by the
  5482. 3:35:01formula n plus one divided by two
  5483. 3:35:04where n is the number of entries
  5484. 3:35:08mode also known as frequency mean is the
  5485. 3:35:11value that occurs most frequently in a
  5486. 3:35:14set of data
  5487. 3:35:15data sets that have more than one mode
  5488. 3:35:18are known as bimodal data
  5489. 3:35:22let us look at an example for
  5490. 3:35:24determining mean median and mode in this
  5491. 3:35:27screen
  5492. 3:35:28the data set has the numbers one two
  5493. 3:35:31three four five five six seven and eight
  5494. 3:35:36click the button to know the answer
  5495. 3:35:39as previously defined
  5496. 3:35:41mean is the sum of all the data items
  5497. 3:35:44divided by the number of items
  5498. 3:35:46therefore the mean is equal to 41
  5499. 3:35:49divided by 9 which is equal to four
  5500. 3:35:52point five six
  5501. 3:35:54the number in the middle of the data set
  5502. 3:35:56is five
  5503. 3:35:57therefore the median is five
  5504. 3:36:00mode is the most frequently occurring
  5505. 3:36:02number which is again five
  5506. 3:36:05in this screen we will understand the
  5507. 3:36:07effect of outliers on the data set
  5508. 3:36:10let us consider a minor change to the
  5509. 3:36:13data set a new number 100 is added to
  5510. 3:36:16the data set
  5511. 3:36:18on using the same formula to calculate
  5512. 3:36:20mean
  5513. 3:36:21the new mean is
  5514. 3:36:2315.11
  5515. 3:36:24ideally 50 percent of values should lie
  5516. 3:36:27on either side of the mean value
  5517. 3:36:30however in this example it can be seen
  5518. 3:36:33that almost 90 percent of values lie
  5519. 3:36:35below the mean value of 15.11
  5520. 3:36:39and only one value above the mean
  5521. 3:36:42the data point 100 is called an outlier
  5522. 3:36:46an outlier is an extreme value in the
  5523. 3:36:48data set that skews the mean value to
  5524. 3:36:51one side of the data set
  5525. 3:36:53note that the median remains unchanged
  5526. 3:36:55at five therefore mean is not an
  5527. 3:36:58appropriate measure of central tendency
  5528. 3:37:01if the data has outliers
  5529. 3:37:03median is preferred in this case
  5530. 3:37:06in the next screen we will look at
  5531. 3:37:07measures of dispersion of the
  5532. 3:37:09descriptive statistics
  5533. 3:37:12apart from central tendency another
  5534. 3:37:15important parameter to describe a data
  5535. 3:37:17set is spread or dispersion
  5536. 3:37:20contrary to the measures of central
  5537. 3:37:22tendency such as mean median and mode
  5538. 3:37:26measures of dispersion express the
  5539. 3:37:28spread of values
  5540. 3:37:30higher the variation of data points
  5541. 3:37:32higher the spread of the data
  5542. 3:37:35the three main measures of dispersion
  5543. 3:37:37are range
  5544. 3:37:38variance and standard deviation
  5545. 3:37:41we will discuss each of these in the
  5546. 3:37:44upcoming screens
  5547. 3:37:46let us start with the first measure of
  5548. 3:37:48dispersion range
  5549. 3:37:50the range of a particular set of data is
  5550. 3:37:52defined as the difference between the
  5551. 3:37:54largest and smallest values of the data
  5552. 3:37:58in the example the largest value of the
  5553. 3:38:01data is nine and the smallest value is
  5554. 3:38:04one
  5555. 3:38:05therefore the range is nine minus one
  5556. 3:38:08eight
  5557. 3:38:09in calculating range all the data points
  5558. 3:38:11are not needed and only the maximum and
  5559. 3:38:14minimum values are required
  5560. 3:38:17let us understand the next measure of
  5561. 3:38:19dispersion variance in the following
  5562. 3:38:22screen
  5563. 3:38:25the variance denoted as sigma square or
  5564. 3:38:28s square
  5565. 3:38:29is defined as the average of squared
  5566. 3:38:32mean differences
  5567. 3:38:33and shows the variation in a data set
  5568. 3:38:37to calculate the variance for a sample
  5569. 3:38:39data set of 10 numbers type the numbers
  5570. 3:38:42in an excel sheet calculate the variance
  5571. 3:38:45using the formula equals v-a-r-p or
  5572. 3:38:48v-a-r-s
  5573. 3:38:51the v-a-r-p formula gives the population
  5574. 3:38:54variance which is 7.24 for this example
  5575. 3:38:58the v a r s formula gives the sample
  5576. 3:39:01variance 8.04
  5577. 3:39:05population variance is calculated when
  5578. 3:39:07the data set is for the entire
  5579. 3:39:09population and sample variance is
  5580. 3:39:11calculated when data is available only
  5581. 3:39:14for a sample of the population
  5582. 3:39:16population variance is preferred over
  5583. 3:39:19sample variance as the latter is only an
  5584. 3:39:22estimate
  5585. 3:39:23sample variance allows for a broader
  5586. 3:39:25range of possible answers for the true
  5587. 3:39:28mean of the population
  5588. 3:39:29that is the confidence levels are higher
  5589. 3:39:32in sample variance
  5590. 3:39:34note that variance is a measure of
  5591. 3:39:36variation and cannot be considered as
  5592. 3:39:38the variation in a data set
  5593. 3:39:41in the following screen we will
  5594. 3:39:43understand the next measure of
  5595. 3:39:44dispersion
  5596. 3:39:46standard deviation
  5597. 3:39:48standard deviation denoted by sigma or s
  5598. 3:39:52is given by the square root of variance
  5599. 3:39:55the statistical notation of this is
  5600. 3:39:57given on screen
  5601. 3:39:59standard deviation is the most important
  5602. 3:40:01measure of dispersion
  5603. 3:40:03standard deviation is always relative to
  5604. 3:40:06the mean
  5605. 3:40:07for the same data set the population
  5606. 3:40:10standard deviation is 2.69
  5607. 3:40:13and sample standard deviation is 2.83
  5608. 3:40:17as in variance calculation if the data
  5609. 3:40:20set is measured for every unit in a
  5610. 3:40:22population
  5611. 3:40:23the population standard deviation and
  5612. 3:40:26sample standard deviation can be
  5613. 3:40:28calculated in excel using the formula
  5614. 3:40:31given on the screen
  5615. 3:40:33the steps to manually calculate the
  5616. 3:40:35standard deviation are
  5617. 3:40:38first calculate the mean
  5618. 3:40:40then calculate the difference between
  5619. 3:40:43each data point and the mean and square
  5620. 3:40:45that answer
  5621. 3:40:47next calculate the sum of the squares
  5622. 3:40:50next divide the sum of the squares by n
  5623. 3:40:53or n minus 1 to find the variance
  5624. 3:40:57lastly find the square root of variance
  5625. 3:40:59which gives the standard deviation
  5626. 3:41:02in the next screen we will look at
  5627. 3:41:04frequency distribution of the
  5628. 3:41:05descriptive statistics
  5629. 3:41:08frequency distribution is a method of
  5630. 3:41:10grouping data into mutually exclusive
  5631. 3:41:13categories showing the number of
  5632. 3:41:14observations in each class
  5633. 3:41:17an example is presented to demonstrate
  5634. 3:41:20frequency distribution
  5635. 3:41:22a survey was conducted among the
  5636. 3:41:24residents of a particular area to
  5637. 3:41:26collect data on cars owned by each home
  5638. 3:41:30a total of 20 homes were surveyed
  5639. 3:41:33to create a frequency table for the
  5640. 3:41:35results collected in the survey
  5641. 3:41:37the first step is to divide the results
  5642. 3:41:39into intervals and count the number of
  5643. 3:41:42results in each interval
  5644. 3:41:44for instance in this example
  5645. 3:41:47the intervals would be the number of
  5646. 3:41:48households with no car
  5647. 3:41:51one car
  5648. 3:41:52two cars and so on
  5649. 3:41:55next a table is created with separate
  5650. 3:41:57columns for the intervals the tallied
  5651. 3:42:00results for each interval and the number
  5652. 3:42:02of occurrences or frequency of results
  5653. 3:42:05in each interval
  5654. 3:42:07each result for a given interval is
  5655. 3:42:09recorded with a tally mark in the second
  5656. 3:42:11column the tally marks for each interval
  5657. 3:42:14are added and the sum is entered in the
  5658. 3:42:16frequency column
  5659. 3:42:18the frequency table allows viewing
  5660. 3:42:20distribution of data across a set of
  5661. 3:42:22values at a glance in the following
  5662. 3:42:24screen we will look at cumulative
  5663. 3:42:27frequency distribution
  5664. 3:42:29a cumulative frequency distribution
  5665. 3:42:32table is similar to the frequency
  5666. 3:42:34distribution table only more detailed
  5667. 3:42:37there are additional columns for
  5668. 3:42:39cumulative frequency percentage and
  5669. 3:42:42cumulative percentage
  5670. 3:42:44in the cumulative frequency column the
  5671. 3:42:46cumulative frequency or the previous row
  5672. 3:42:49or rows is added to the current row
  5673. 3:42:52the percentage is calculated by dividing
  5674. 3:42:54the frequency by the total number of
  5675. 3:42:56results and multiplying by one hundred
  5676. 3:42:59the cumulative percentage is calculated
  5677. 3:43:02similar to the cumulative frequency
  5678. 3:43:06let us look at an example for cumulative
  5679. 3:43:08frequency distribution
  5680. 3:43:11the ages of all the participants in a
  5681. 3:43:13chess tournament are recorded
  5682. 3:43:16the lowest age is 37 and the highest is
  5683. 3:43:1991.
  5684. 3:43:20keeping intervals of 10
  5685. 3:43:23the lowest interval starts with the
  5686. 3:43:24lower limit as 35
  5687. 3:43:27and the upper limit as 44.
  5688. 3:43:30similar intervals are created until an
  5689. 3:43:32upper limit of ninety four
  5690. 3:43:34in the frequency column the number of
  5691. 3:43:37times a result appears in a particular
  5692. 3:43:40interval is recorded in the cumulative
  5693. 3:43:42frequency column the cumulative
  5694. 3:43:44frequency of the previous row is added
  5695. 3:43:46to the frequency of the current row
  5696. 3:43:49for the first row the cumulative
  5697. 3:43:51frequency is the same as the frequency
  5698. 3:43:54in the second row the cumulative
  5699. 3:43:56frequency is one plus two which is three
  5700. 3:43:59and so on
  5701. 3:44:01in the percentage column the percentage
  5702. 3:44:03of the frequency is listed by dividing
  5703. 3:44:06the frequency by the total number of
  5704. 3:44:08results which is 10 and multiplying the
  5705. 3:44:11value by 100
  5706. 3:44:13for instance in the first row the
  5707. 3:44:15frequency is one and the number of
  5708. 3:44:18results is ten
  5709. 3:44:20therefore the percentage is ten the
  5710. 3:44:22final column is the cumulative
  5711. 3:44:24percentage column in this column the
  5712. 3:44:27cumulative frequency is divided by the
  5713. 3:44:29total number of results which is ten and
  5714. 3:44:32the value is multiplied by hundred
  5715. 3:44:35note that the last number in this column
  5716. 3:44:37should be equal to one hundred in this
  5717. 3:44:39example the cumulative frequency is one
  5718. 3:44:42and the total number of results is ten
  5719. 3:44:45therefore the cumulative percentage of
  5720. 3:44:47the first row is ten
  5721. 3:44:49let us look at the stem and leaf plots
  5722. 3:44:52which is one of the graphical methods of
  5723. 3:44:54understanding distribution
  5724. 3:44:56graphical methods are extremely useful
  5725. 3:44:59tools to understand how data is
  5726. 3:45:01distributed
  5727. 3:45:02sometimes merely by looking at the data
  5728. 3:45:04distribution errors in a process can be
  5729. 3:45:07identified
  5730. 3:45:09the stem and leaf method is a convenient
  5731. 3:45:11method of manually plotting data sets
  5732. 3:45:14it is used for presenting data in a
  5733. 3:45:16graphical format to assist visualizing
  5734. 3:45:19the shape of a given distribution
  5735. 3:45:22in the example on the screen the
  5736. 3:45:24temperatures in fahrenheit for the month
  5737. 3:45:26of may are given
  5738. 3:45:28to collate this information in a stem
  5739. 3:45:30and leaf plot
  5740. 3:45:31all the tens digits are entered in the
  5741. 3:45:33stem column and all the units digits
  5742. 3:45:36against each tens digit are entered in
  5743. 3:45:38the leaf column to start with the lowest
  5744. 3:45:41value is considered
  5745. 3:45:42in this case the lowest temperature is
  5746. 3:45:4551.
  5747. 3:45:46in the first row five is entered in the
  5748. 3:45:48stem column and zero in the leaf column
  5749. 3:45:52the next lowest temperature is 58.
  5750. 3:45:54eight is entered in the leaf column
  5751. 3:45:56corresponding to five in the stem
  5752. 3:45:59the next number is fifty-nine
  5753. 3:46:01all the temperatures falling in the
  5754. 3:46:03fifties are similarly entered
  5755. 3:46:05in the next row the same process is
  5756. 3:46:07repeated for temperatures in the sixties
  5757. 3:46:10this is continued till all the
  5758. 3:46:12temperature values are entered in the
  5759. 3:46:14table
  5760. 3:46:16let us understand another graphical
  5761. 3:46:18method in the next screen
  5762. 3:46:20box and whisker plots
  5763. 3:46:23a box and whisker graph based on medians
  5764. 3:46:26or quartiles is used to display a data
  5765. 3:46:29set in a way that allows viewing the
  5766. 3:46:30distribution of the data points easily
  5767. 3:46:33consider the following example the
  5768. 3:46:36lengths of 13 fish caught in a lake were
  5769. 3:46:39measured and recorded
  5770. 3:46:40the data set is given on the screen
  5771. 3:46:43the first step to draw a box and whisker
  5772. 3:46:45plot is therefore to arrange the numbers
  5773. 3:46:48in increasing order next find the median
  5774. 3:46:51as there is an odd number of data
  5775. 3:46:54entries the median is the number in the
  5776. 3:46:56middle of the data set which in this
  5777. 3:46:58case is 12.
  5778. 3:47:00the next step is to find the lower
  5779. 3:47:02median or quartile
  5780. 3:47:04this is the median of the lower six
  5781. 3:47:06numbers
  5782. 3:47:07the middle of these numbers is halfway
  5783. 3:47:09between 8 and 9 which would be 8.5
  5784. 3:47:13similarly the upper median or quartile
  5785. 3:47:16is located for the upper six numbers to
  5786. 3:47:18the right of the median the upper median
  5787. 3:47:21is halfway between the two values
  5788. 3:47:23fourteen and fourteen
  5789. 3:47:25therefore the upper median is fourteen
  5790. 3:47:29let us now understand how the box and
  5791. 3:47:31whisker chart is drawn using the values
  5792. 3:47:34of the median and upper and lower
  5793. 3:47:36quartiles
  5794. 3:47:37the next step is a numbered line is
  5795. 3:47:39drawn extending far enough to include
  5796. 3:47:42all the data points
  5797. 3:47:44then a vertical line is drawn from the
  5798. 3:47:46median point 12.
  5799. 3:47:48the lower and upper quartiles 8.5 and 14
  5800. 3:47:52respectively are marked with vertical
  5801. 3:47:54lines and these are joined with the
  5802. 3:47:56median line to form two boxes as shown
  5803. 3:47:59on the screen
  5804. 3:48:00next two whiskers are extended from
  5805. 3:48:03either ends of the boxes as shown to the
  5806. 3:48:05smallest and largest numbers in the data
  5807. 3:48:07set
  5808. 3:48:085 and 20 respectively
  5809. 3:48:10the box and whiskers graph is now
  5810. 3:48:13complete the following inferences can be
  5811. 3:48:16drawn from the box and whisker plot
  5812. 3:48:18the lengths of the fish range from five
  5813. 3:48:20to twenty the range is therefore fifteen
  5814. 3:48:24the quartiles split the data into four
  5815. 3:48:27equal parts
  5816. 3:48:28in other words one quarter of the data
  5817. 3:48:30numbers is less than 8.5
  5818. 3:48:33one quarter between 8.5 and 12
  5819. 3:48:36next quarter of the data numbers are
  5820. 3:48:38between 12 and 14
  5821. 3:48:40and another quarter has data numbers
  5822. 3:48:43greater than 14.
  5823. 3:48:46in this screen we will learn about
  5824. 3:48:48another graphical method scatter
  5825. 3:48:50diagrams
  5826. 3:48:52a scatter diagram or scatter plot is a
  5827. 3:48:55tool used to analyze the relationship or
  5828. 3:48:58correlation between two sets of
  5829. 3:49:00variables x and y
  5830. 3:49:02with x as the independent variable and y
  5831. 3:49:05as the dependent variable
  5832. 3:49:07a scatter diagram is also useful when
  5833. 3:49:10cause effect relationships have to be
  5834. 3:49:12examined or root causes have to be
  5835. 3:49:15identified
  5836. 3:49:16there are five different types of
  5837. 3:49:18correlation that can be used in a
  5838. 3:49:20scatter diagram
  5839. 3:49:22let us learn about them in the next
  5840. 3:49:23screen
  5841. 3:49:26the five types of correlation are
  5842. 3:49:28perfect positive correlation moderate
  5843. 3:49:31positive correlation
  5844. 3:49:32no relation or no correlation
  5845. 3:49:35moderate negative correlation
  5846. 3:49:37and perfect negative correlation
  5847. 3:49:40click each type to learn more
  5848. 3:49:43in perfect positive correlation the
  5849. 3:49:46value of dependent variable y increases
  5850. 3:49:49proportionally with any increase in the
  5851. 3:49:51value of independent variable x
  5852. 3:49:54this is said to be one is to one
  5853. 3:49:57that is any change in one variable
  5854. 3:49:59results in an equal amount of change in
  5855. 3:50:02the other
  5856. 3:50:03the following example is presented to
  5857. 3:50:05demonstrate perfect positive correlation
  5858. 3:50:08the consumption of milk is found to
  5859. 3:50:11increase proportionally with an increase
  5860. 3:50:13in the consumption of coffee
  5861. 3:50:15the data is presented in the table on
  5862. 3:50:17the screen
  5863. 3:50:19the scatter diagram for the data is also
  5864. 3:50:21shown
  5865. 3:50:22it can be observed from the graph that
  5866. 3:50:24as x increases y also increases
  5867. 3:50:28proportionally
  5868. 3:50:29hence the points are linear
  5869. 3:50:33in this type of correlation as the value
  5870. 3:50:36of the x variable increases the value of
  5871. 3:50:39y also increases but not in the same
  5872. 3:50:42proportion
  5873. 3:50:44to demonstrate this the following
  5874. 3:50:46example is presented the increase in
  5875. 3:50:49savings for increase in salary is shown
  5876. 3:50:51in the table
  5877. 3:50:53as you can notice in the scatter diagram
  5878. 3:50:56the points are not linear
  5879. 3:50:58although the value of y increases with
  5880. 3:51:01increase in the value of x the increase
  5881. 3:51:04is not proportional
  5882. 3:51:07when a change in one variable has no
  5883. 3:51:10impact on the other
  5884. 3:51:11there is no relation or correlation
  5885. 3:51:14between them
  5886. 3:51:15let us consider the following example
  5887. 3:51:18to study the relation between the number
  5888. 3:51:20of fresh graduates in the city and the
  5889. 3:51:23job openings available
  5890. 3:51:25data for both was collected over a few
  5891. 3:51:27months and tabulated as shown
  5892. 3:51:30the scatter diagram for the same is also
  5893. 3:51:32displayed
  5894. 3:51:34it can be observed that the data points
  5895. 3:51:36are scattered and there is no trend
  5896. 3:51:38emerging from the graph
  5897. 3:51:40therefore there is no correlation
  5898. 3:51:42between the number of fresh graduates
  5899. 3:51:45and the number of job openings in the
  5900. 3:51:47city
  5901. 3:51:50in moderate negative correlation an
  5902. 3:51:52increase in one variable results in a
  5903. 3:51:55decrease in the other variable however
  5904. 3:51:58this change is not proportional to the
  5905. 3:52:00change in the first variable
  5906. 3:52:02to demonstrate modern negative
  5907. 3:52:04correlation
  5908. 3:52:05the prices of different products are
  5909. 3:52:07listed along with the number of units
  5910. 3:52:10sold for each product the data is shown
  5911. 3:52:12in the table
  5912. 3:52:14from the scatter diagram shown
  5913. 3:52:16it can be observed that higher the price
  5914. 3:52:19of a product
  5915. 3:52:20lesser are the number of units of that
  5916. 3:52:22product sold
  5917. 3:52:24however the decrease in the number of
  5918. 3:52:26units with increasing price is not
  5919. 3:52:28proportional
  5920. 3:52:32in perfect negative correlation an
  5921. 3:52:34increase in one variable results in a
  5922. 3:52:37proportional decrease of the other
  5923. 3:52:39variable
  5924. 3:52:40this is also an example of one is to one
  5925. 3:52:43correlation
  5926. 3:52:45as an example the effect of an increase
  5927. 3:52:47in the project time extension on the
  5928. 3:52:49success of project is considered
  5929. 3:52:52the data is shown in the table the
  5930. 3:52:55scatter diagram for the data shows a
  5931. 3:52:57proportional decrease in the probability
  5932. 3:53:00of the project's success with each
  5933. 3:53:02extension of the project time
  5934. 3:53:04hence the points are linear
  5935. 3:53:07perfect correlations are rare in the
  5936. 3:53:09real world
  5937. 3:53:10when encountered they should be
  5938. 3:53:12investigated and verified
  5939. 3:53:16in this screen we will look at another
  5940. 3:53:18graphical method histograms
  5941. 3:53:21histograms are similar to bar graphs
  5942. 3:53:23except that the data in histograms is
  5943. 3:53:26grouped into intervals
  5944. 3:53:28they are used to represent category wise
  5945. 3:53:30data graphically
  5946. 3:53:32a histogram is best suited for
  5947. 3:53:33continuous data
  5948. 3:53:35the following example illustrates how a
  5949. 3:53:38histogram is used to represent data
  5950. 3:53:41data on the number of hours spent by a
  5951. 3:53:43group of 15 people on a special project
  5952. 3:53:46in one week is collected
  5953. 3:53:49this data is then divided into intervals
  5954. 3:53:51of two and the frequency table for the
  5955. 3:53:54data is created
  5956. 3:53:56the histogram for the same data is also
  5957. 3:53:58displayed
  5958. 3:54:00looking at the histogram it can be
  5959. 3:54:02observed at a glance that most of the
  5960. 3:54:05team members spent between two to four
  5961. 3:54:07hours on the project
  5962. 3:54:09in the following screen we will look at
  5963. 3:54:11the next graphical method
  5964. 3:54:14normal probability plots
  5965. 3:54:16normal probability plots are used to
  5966. 3:54:19identify if a sample has been taken from
  5967. 3:54:21a normal distributed population
  5968. 3:54:24when sample data from a normal
  5969. 3:54:25distributive population is represented
  5970. 3:54:28as a normal probability plot it forms a
  5971. 3:54:31straight line
  5972. 3:54:33the following example is presented to
  5973. 3:54:35illustrate normal probability plots
  5974. 3:54:38a sampling of diameters from a drilling
  5975. 3:54:40operation is done and the data is
  5976. 3:54:42recorded
  5977. 3:54:43the data set is given to create a normal
  5978. 3:54:47probability plot the first step is to
  5979. 3:54:49construct a cumulative frequency
  5980. 3:54:51distribution table
  5981. 3:54:53this is followed by calculating the mean
  5982. 3:54:55rank probability by dividing the
  5983. 3:54:57cumulative frequency by the number of
  5984. 3:54:59samples plus one and multiplying the
  5985. 3:55:02answer by one hundred
  5986. 3:55:04the fully populated table for mean rank
  5987. 3:55:07probability estimation is shown on the
  5988. 3:55:09screen
  5989. 3:55:10please take a look at the same
  5990. 3:55:12in the next step a graph is plotted on
  5991. 3:55:14log paper or with minitab using this
  5992. 3:55:17data
  5993. 3:55:18minitab is a statistical software used
  5994. 3:55:21in six sigma
  5995. 3:55:22minitab normal probability plot
  5996. 3:55:24instructions are also given on the
  5997. 3:55:26screen the completed graph is shown on
  5998. 3:55:29the screen
  5999. 3:55:30from the graph it can be seen that the
  6000. 3:55:32random sample forms a straight line and
  6001. 3:55:35therefore the data is taken from a
  6002. 3:55:36normally distributed population
  6003. 3:55:39let us proceed to the next topic of this
  6004. 3:55:42lesson
  6005. 3:55:43in this topic we will discuss
  6006. 3:55:45measurement system analysis or msa in
  6007. 3:55:48detail
  6008. 3:55:49let us understand what msa is in the
  6009. 3:55:51following screen throughout the dmac
  6010. 3:55:53process the output of the measurement
  6011. 3:55:55system ms is used for metrics analysis
  6012. 3:55:59and control efforts
  6013. 3:56:00an error prone measurement system will
  6014. 3:56:02only lead to incorrect data
  6015. 3:56:05incorrect data leads to incorrect
  6016. 3:56:06conclusions
  6017. 3:56:08it is important to set right the ms
  6018. 3:56:10before collecting the data
  6019. 3:56:13measurement system analysis or msa
  6020. 3:56:16is a technique that identifies
  6021. 3:56:18measurement error or variation and
  6022. 3:56:21sources of that error in order to reduce
  6023. 3:56:23the variation
  6024. 3:56:25it evaluates the measuring system to
  6025. 3:56:27ensure the integrity of data used for
  6026. 3:56:30analysis
  6027. 3:56:31msa is therefore one of the first
  6028. 3:56:33activities in the measure phase
  6029. 3:56:36the measurement systems capability is
  6030. 3:56:38calculated analyzed and interpreted
  6031. 3:56:41using gauge repeatability and
  6032. 3:56:43reproducibility to determine measurement
  6033. 3:56:45correlation bias linearity percent
  6034. 3:56:49agreement and precision or tolerance
  6035. 3:56:52let us discuss the objectives of msa in
  6036. 3:56:55the next screen
  6037. 3:56:59a primary objective of msa is to obtain
  6038. 3:57:02information about the type of
  6039. 3:57:04measurement variation associated with
  6040. 3:57:06the measurement system
  6041. 3:57:08it is also used to establish criteria to
  6042. 3:57:11accept and release new measuring
  6043. 3:57:12equipment
  6044. 3:57:14msa also compares measuring one method
  6045. 3:57:17against another it helps to form a basis
  6046. 3:57:20for evaluating a method which is
  6047. 3:57:22suspected of being deficient
  6048. 3:57:24the measurement system variations should
  6049. 3:57:27be resolved to arrive at the correct
  6050. 3:57:28baselines for the project objectives
  6051. 3:57:31as baselines contain crucial data based
  6052. 3:57:34on which decisions are taken it is
  6053. 3:57:36extremely important that the measurement
  6054. 3:57:38system be free of error as far as
  6055. 3:57:40possible
  6056. 3:57:42let us look at measurement analysis in
  6057. 3:57:44detail in the next screen
  6058. 3:57:48in measurement analysis the observed
  6059. 3:57:50value is equal to the sum of the true
  6060. 3:57:52value and the measurement error
  6061. 3:57:55the measurement error can be a negative
  6062. 3:57:57or a positive value
  6063. 3:57:59measurement error refers to the net
  6064. 3:58:01effect of all sources of measurement
  6065. 3:58:03variability that cause an observed value
  6066. 3:58:06to deviate from the true value
  6067. 3:58:09true variability is the sum of the
  6068. 3:58:11process variability and the measurement
  6069. 3:58:14variability process variability and
  6070. 3:58:17measurement variability must be
  6071. 3:58:19evaluated and improved together
  6072. 3:58:22measurement variability should be
  6073. 3:58:24addressed before looking at process
  6074. 3:58:26variability
  6075. 3:58:28if process variability is corrected
  6076. 3:58:30before resolving measurement variability
  6077. 3:58:33then any improvements to the process can
  6078. 3:58:36not be trusted to have taken place owing
  6079. 3:58:38to a faulty measurement system
  6080. 3:58:41in the following screen we will identify
  6081. 3:58:44the types of measurement errors
  6082. 3:58:47the two types of measurement errors are
  6083. 3:58:50measurement system bias and measurement
  6084. 3:58:52system variation
  6085. 3:58:54click each type to know more
  6086. 3:58:56measurement system bias involves
  6087. 3:58:58calibration study
  6088. 3:59:00in the calibration study the total mean
  6089. 3:59:02is given by the sum of the process mean
  6090. 3:59:04and the measurement mean
  6091. 3:59:06the statistical notation is shown on the
  6092. 3:59:09screen
  6093. 3:59:10measurement system variation involves
  6094. 3:59:13gauge repeatability and reproducibility
  6095. 3:59:16or grrr study
  6096. 3:59:18in the grr study the total variance is
  6097. 3:59:21calculated by adding the process
  6098. 3:59:23variance with the measurement variation
  6099. 3:59:25the statistical notation is shown on the
  6100. 3:59:28screen
  6101. 3:59:30in this screen we will discuss the
  6102. 3:59:32sources of variation the chart on the
  6103. 3:59:34screen lists the different sources of
  6104. 3:59:36variation
  6105. 3:59:37observed process variation is divided
  6106. 3:59:40into two
  6107. 3:59:41actual process variation and measurement
  6108. 3:59:43variation
  6109. 3:59:45actual process variation can be divided
  6110. 3:59:48into long-term and short-term process
  6111. 3:59:50variations
  6112. 3:59:52in a gauge rr study process variation is
  6113. 3:59:55often called part variation
  6114. 3:59:58measurement variation can be divided
  6115. 4:00:00into variations caused by operators and
  6116. 4:00:03variations due to the gauge
  6117. 4:00:05the variation due to operators is owing
  6118. 4:00:08to reproducibility
  6119. 4:00:10variation due to gauge is owing to
  6120. 4:00:12repeatability
  6121. 4:00:14both actual process variation and
  6122. 4:00:16measurement variation have a common
  6123. 4:00:18factor that is variation within a sample
  6124. 4:00:22let us understand gauge repeatability
  6125. 4:00:25and reproducibility or grr in the next
  6126. 4:00:28screen
  6127. 4:00:30gauge repeatability and reproducibility
  6128. 4:00:32or grr is a statistical technique to
  6129. 4:00:36assess if a gauge or gauging system will
  6130. 4:00:38obtain the same reading each time a
  6131. 4:00:40particular characteristic or parameter
  6132. 4:00:42is measured
  6133. 4:00:44gauge repeatability is the variation in
  6134. 4:00:47measurement when one operator uses the
  6135. 4:00:49same gauge to measure identical
  6136. 4:00:51characteristics of the same part
  6137. 4:00:53repeatedly
  6138. 4:00:55gauge reproducibility is the variation
  6139. 4:00:57in the average of measurements when
  6140. 4:00:59different operators use the same gauge
  6141. 4:01:02to measure identical characteristics of
  6142. 4:01:04the same part
  6143. 4:01:05the figures on the screen illustrate
  6144. 4:01:07gauge repeatability and reproducibility
  6145. 4:01:11in the next screen we will discuss the
  6146. 4:01:13components of grr study
  6147. 4:01:17the figure on the screen illustrates the
  6148. 4:01:19difference between gauge repeatability
  6149. 4:01:22and reproducibility
  6150. 4:01:24the figure shows the repeatability and
  6151. 4:01:26reproducibility for six different parts
  6152. 4:01:29represented by the numbers one to six
  6153. 4:01:31for two different trial readings by
  6154. 4:01:33three different operators
  6155. 4:01:35as can be observed a difference in
  6156. 4:01:38reading for part one indicated by the
  6157. 4:01:40color green by three different operators
  6158. 4:01:43is known as reproducibility error a
  6159. 4:01:46difference in reading of part 4
  6160. 4:01:48indicated by red by the same operator in
  6161. 4:01:51two different trials is known as the
  6162. 4:01:53repeatability error
  6163. 4:01:55in the following screen we will look at
  6164. 4:01:57some guidelines for gauge repeatability
  6165. 4:02:00and reproducibility studies
  6166. 4:02:03the following should be kept in mind
  6167. 4:02:05while carrying out gauge repeatability
  6168. 4:02:07and reproducibility or grr studies
  6169. 4:02:11grr studies should be performed over the
  6170. 4:02:14range of expected observations
  6171. 4:02:16care should be taken to use actual
  6172. 4:02:18equipment for gr studies
  6173. 4:02:21written procedures and approved
  6174. 4:02:23practices should be followed as would
  6175. 4:02:25have been in actual operations
  6176. 4:02:27the measurement variability should be
  6177. 4:02:29represented as is
  6178. 4:02:31not the way it was designed to be
  6179. 4:02:34after grr the measurement variability is
  6180. 4:02:37separated into casual components sorted
  6181. 4:02:40according to priority and then targeted
  6182. 4:02:42for action
  6183. 4:02:43in the following screen let us look at
  6184. 4:02:46some more concepts associated with grr
  6185. 4:02:51bias is the distance between the sample
  6186. 4:02:53mean value and the sample true value
  6187. 4:02:56it is also called accuracy
  6188. 4:02:59bias is equal to mean minus reference
  6189. 4:03:01value process variation is equal to six
  6190. 4:03:04times the standard deviation
  6191. 4:03:06the bias percentage is calculated as
  6192. 4:03:09bias divided by the process variation
  6193. 4:03:12the next term is linearity
  6194. 4:03:14linearity refers to the consistency of
  6195. 4:03:17bias over the range of the gauge
  6196. 4:03:19linearity is given by the product of
  6197. 4:03:21slope and process variation
  6198. 4:03:24precision is the degree of repeatability
  6199. 4:03:27or closeness of data
  6200. 4:03:29smaller the dispersion in the data set
  6201. 4:03:32better the precision
  6202. 4:03:33the variation in the gauge is the sum of
  6203. 4:03:36variation due to repeatability and the
  6204. 4:03:38variation due to reproducibility
  6205. 4:03:42in the following screen we will
  6206. 4:03:43understand measurement resolution
  6207. 4:03:47measurement resolution is the smallest
  6208. 4:03:49detectable increment that an instrument
  6209. 4:03:51will measure or display
  6210. 4:03:53the number of increments in the
  6211. 4:03:55measurement system should extend over
  6212. 4:03:57the full range for a given parameter
  6213. 4:04:00some examples of wrong gauges or
  6214. 4:04:02incorrect measurement resolution are
  6215. 4:04:04given here a truck weighing scale is
  6216. 4:04:07used for measuring the weight of a
  6217. 4:04:09t-pack
  6218. 4:04:10a caliper capable of measuring
  6219. 4:04:12differences of 0.1 millimeters
  6220. 4:04:15is used to show compliance when the
  6221. 4:04:17tolerance limits are plus or minus 0.07
  6222. 4:04:20millimeters
  6223. 4:04:21thus the measurement system that matches
  6224. 4:04:24the range of the data should only be
  6225. 4:04:26used
  6226. 4:04:27an important prerequisite for grr
  6227. 4:04:29studies is that the gauge has an
  6228. 4:04:31acceptable resolution
  6229. 4:04:34in the next screen we will look at
  6230. 4:04:35examples for repeatability and
  6231. 4:04:37reproducibility
  6232. 4:04:40repeatability is also called equipment
  6233. 4:04:43variation or ev
  6234. 4:04:46it occurs when the same technician or
  6235. 4:04:48operator repeatedly measures the same
  6236. 4:04:50part or process under identical
  6237. 4:04:53conditions with the same measurement
  6238. 4:04:55system
  6239. 4:04:56the following example illustrates this
  6240. 4:04:58concept
  6241. 4:04:59a 36 kilometer per hour pace mechanism
  6242. 4:05:02is timed by a single operator over a
  6243. 4:05:05distance of 100 meters on a stopwatch
  6244. 4:05:08and three readings are taken
  6245. 4:05:10trial one takes nine seconds trial two
  6246. 4:05:13takes ten seconds and trial 3 takes 11
  6247. 4:05:16seconds
  6248. 4:05:18the process is measured with the same
  6249. 4:05:20equipment in identical conditions by the
  6250. 4:05:22same operator
  6251. 4:05:23assuming no operator error the variation
  6252. 4:05:26in the three readings is known as
  6253. 4:05:28repeatability or equipment variation
  6254. 4:05:32reproducibility is also called appraiser
  6255. 4:05:35variation or av
  6256. 4:05:38it occurs when different technicians or
  6257. 4:05:40operators measure the same part or
  6258. 4:05:42process under identical conditions using
  6259. 4:05:44the same measurement system
  6260. 4:05:47let us extend the example for
  6261. 4:05:48repeatability to include data measured
  6262. 4:05:51by two operators
  6263. 4:05:52the readings are displayed on the slide
  6264. 4:05:55the difference in the readings of both
  6265. 4:05:57operators is called reproducibility or
  6266. 4:06:00appraiser variation
  6267. 4:06:02it is important to resolve equipment
  6268. 4:06:04variation before appraiser variation
  6269. 4:06:07if appraiser variation is resolved first
  6270. 4:06:10the results will still not be identical
  6271. 4:06:12due to variation in the equipment itself
  6272. 4:06:16in this screen we will learn about data
  6273. 4:06:19collection in grr
  6274. 4:06:21there are some important considerations
  6275. 4:06:23for data collection in grr studies there
  6276. 4:06:26are usually three operators and around
  6277. 4:06:28ten units to measure
  6278. 4:06:30general sampling techniques must be used
  6279. 4:06:33to represent the population and each
  6280. 4:06:35unit must be measured two to three times
  6281. 4:06:38by each operator it is important that
  6282. 4:06:40the gauge be calibrated accurately it
  6283. 4:06:43should also be ensured that the gauge
  6284. 4:06:45has an acceptable resolution
  6285. 4:06:48another practice is that the first
  6286. 4:06:50operator measures all the units in
  6287. 4:06:52random order
  6288. 4:06:53then this order is maintained by all
  6289. 4:06:55other operators
  6290. 4:06:57all the trials must be repeated
  6291. 4:06:59in the next screen we will discuss the
  6292. 4:07:01anova method of analyzing grr studies
  6293. 4:07:06the anova method is considered to be the
  6294. 4:07:08best method for analyzing grr studies
  6295. 4:07:11this is because of two reasons
  6296. 4:07:14the first being anova not only separates
  6297. 4:07:17equipment and operator variation but
  6298. 4:07:19also provides insight on the combined
  6299. 4:07:21effect of the two
  6300. 4:07:23second anova uses standard deviation
  6301. 4:07:26instead of range as a measure of
  6302. 4:07:28variation and therefore gives a better
  6303. 4:07:31estimate of the measurement system
  6304. 4:07:33variation
  6305. 4:07:34the one drawback of using anova is the
  6306. 4:07:36considerations of time resources and
  6307. 4:07:39cost
  6308. 4:07:40in the next screen we will understand
  6309. 4:07:42how msa can be interpreted
  6310. 4:07:45two results are possible for an msa
  6311. 4:07:49in the first case the reproducibility
  6312. 4:07:51error is larger than the repeatability
  6313. 4:07:54error
  6314. 4:07:55this occurs when the operators are not
  6315. 4:07:57trained and calibrations on the gauge
  6316. 4:07:59dial are not clear
  6317. 4:08:01the other possibility is that the
  6318. 4:08:03repeatability error is larger than the
  6319. 4:08:06reproducibility error
  6320. 4:08:08this is clearly a maintenance issue and
  6321. 4:08:10can be resolved by calibrating the
  6322. 4:08:12equipment or performing maintenance on
  6323. 4:08:14the equipment
  6324. 4:08:16this indicates that the gauge needs
  6325. 4:08:18redesign to be more rigid and the
  6326. 4:08:20location needs to be improved
  6327. 4:08:22it also occurs when there is ambiguity
  6328. 4:08:25in sops
  6329. 4:08:27msa is an experiment which seeks to
  6330. 4:08:30identify the components of variation in
  6331. 4:08:32the measurement
  6332. 4:08:34in the following screen we will look at
  6333. 4:08:36a template used for grr studies
  6334. 4:08:40a sample gauge rr sheet is given on this
  6335. 4:08:43screen
  6336. 4:08:44the operators here are andrew murphy and
  6337. 4:08:46lucy wang who are the appraisers in this
  6338. 4:08:49study
  6339. 4:08:50they have measured and rated the
  6340. 4:08:52performance of three employees
  6341. 4:08:54ibrahim glasoff brianna scott and jason
  6342. 4:08:57schmidt
  6343. 4:08:59this is a sample template for a gauge r
  6344. 4:09:02r study
  6345. 4:09:03the parts are shown across the top of
  6346. 4:09:05the sheet
  6347. 4:09:06in this case the measurement system is
  6348. 4:09:08being evaluated using three parts the
  6349. 4:09:11employees abraham glasoff brianna scott
  6350. 4:09:15and jason schmidt
  6351. 4:09:17the operators measure each part
  6352. 4:09:19repeatedly
  6353. 4:09:20from this data the average x and ranges
  6354. 4:09:23are for each inspector and for each part
  6355. 4:09:26are calculated
  6356. 4:09:28the grand average for each inspector and
  6357. 4:09:31each part is also calculated
  6358. 4:09:34in this example a control limit ucl in
  6359. 4:09:37the sheet was compared with the
  6360. 4:09:39difference in averages of the two
  6361. 4:09:41inspectors to identify if there is a
  6362. 4:09:44significant difference in their
  6363. 4:09:46measurements
  6364. 4:09:47their difference is 0.111
  6365. 4:09:51which is outside the ucl of 0.108
  6366. 4:09:55given the r average of 0.042
  6367. 4:09:59in the next screen we will look at the
  6368. 4:10:01results page for this grr study
  6369. 4:10:05the sheet on the screen displays the
  6370. 4:10:07results for the data entered in the
  6371. 4:10:08template in the previous screen
  6372. 4:10:11please spend some time to go through the
  6373. 4:10:12data for a better understanding of the
  6374. 4:10:14concept
  6375. 4:10:16in the following screen we will look at
  6376. 4:10:18the interpretation to this results page
  6377. 4:10:22the percentage grrr value is highlighted
  6378. 4:10:25in the center right of the table in the
  6379. 4:10:27previous screen
  6380. 4:10:28there are three important observations
  6381. 4:10:30to be made here about the gauge rr study
  6382. 4:10:34first this study also shows the
  6383. 4:10:36interaction between operators and parts
  6384. 4:10:39if the percentage grr value is less than
  6385. 4:10:4230 then the gauge is acceptable and the
  6386. 4:10:45measurement system does not require any
  6387. 4:10:47change
  6388. 4:10:48if the value is greater than 30 then the
  6389. 4:10:51gauge needs correction
  6390. 4:10:53the equipment variation is checked and
  6391. 4:10:55resolved first followed by the appraiser
  6392. 4:10:58variation
  6393. 4:10:59second if ev equals zero it means the ms
  6394. 4:11:03is reliable the equipment is perfect and
  6395. 4:11:06the variation in the gauge is
  6396. 4:11:08contributed by different operators
  6397. 4:11:10if the av is equal to zero the ms is
  6398. 4:11:14precise
  6399. 4:11:15third if ev is equal to zero and there
  6400. 4:11:18is a v the operators have to be trained
  6401. 4:11:21to ensure all operators follow identical
  6402. 4:11:24steps during measurement and the av is
  6403. 4:11:27minimal
  6404. 4:11:28the interaction between operators and
  6405. 4:11:30parts can also be studied under grr
  6406. 4:11:33using part variation the trueness and
  6407. 4:11:36precision cannot be determined in a grrr
  6408. 4:11:39if only one gauge or measurement method
  6409. 4:11:41is evaluated as it may have an inherent
  6410. 4:11:44bias that would go undetected merely by
  6411. 4:11:47varying operators and parts
  6412. 4:11:50let us proceed to the next topic of this
  6413. 4:11:52lesson in the following screen
  6414. 4:11:55in this topic we will discuss process
  6415. 4:11:57and performance capability in detail
  6416. 4:12:00in the following screen we will look at
  6417. 4:12:02the differences between natural process
  6418. 4:12:05limits and specification limits
  6419. 4:12:08natural process limits or control limits
  6420. 4:12:12are derived from the process data and
  6421. 4:12:14are the voice of the process
  6422. 4:12:16the data consists of real-time values
  6423. 4:12:19from past process performance
  6424. 4:12:21therefore these values represent the
  6425. 4:12:24actual process limits
  6426. 4:12:26and indicate variation in the process
  6427. 4:12:29the two control limits are upper control
  6428. 4:12:32limit ucl and lower control limit lcl
  6429. 4:12:37specification limits are provided by
  6430. 4:12:39customers based on their requirements or
  6431. 4:12:42the voice of the customer and cannot be
  6432. 4:12:44changed by the organization
  6433. 4:12:47these limits act as targets for the
  6434. 4:12:49organization
  6435. 4:12:51and processes are designed around the
  6436. 4:12:53requirements
  6437. 4:12:54the product or service has to meet
  6438. 4:12:56customer requirements and has to be well
  6439. 4:12:59within the specification limits
  6440. 4:13:02if the product or service does not meet
  6441. 4:13:04customer requirements it is considered
  6442. 4:13:06as a defect
  6443. 4:13:08therefore specification limits are the
  6444. 4:13:10intended results or requirements from
  6445. 4:13:13the product or service that are defined
  6446. 4:13:15by the customer
  6447. 4:13:17the two specification limits are upper
  6448. 4:13:19specification limit or usl
  6449. 4:13:22and lower specification limit or lsl
  6450. 4:13:27the difference between the two is called
  6451. 4:13:29tolerance
  6452. 4:13:30an important point to note is that for a
  6453. 4:13:33process
  6454. 4:13:34if the control limits lie within the
  6455. 4:13:36specification limits the process is said
  6456. 4:13:38to be under control
  6457. 4:13:41conversely if specification limits lie
  6458. 4:13:44within the control limits the process
  6459. 4:13:46will not meet customer requirements
  6460. 4:13:49in the following screen we will look at
  6461. 4:13:51process performance metrics and how they
  6462. 4:13:54are calculated
  6463. 4:13:56the two major metrics used to measure
  6464. 4:13:58process performance are defects per unit
  6465. 4:14:01or dpu
  6466. 4:14:02and defects per million opportunities or
  6467. 4:14:06dpmo dpu is calculated by dividing the
  6468. 4:14:10number of defects by the total number of
  6469. 4:14:12units
  6470. 4:14:13dpmo is calculated by multiplying the
  6471. 4:14:16defects per opportunity with 1 million
  6472. 4:14:20in the following screen we will look at
  6473. 4:14:22an example for calculating process
  6474. 4:14:24performance
  6475. 4:14:28in this example the quality control
  6476. 4:14:30department checks the quality of
  6477. 4:14:31finished goods by sampling a batch of 10
  6478. 4:14:34items from the produced lot every hour
  6479. 4:14:36the data is collected over 24 hours
  6480. 4:14:40the table displays the data for the
  6481. 4:14:41number of defectives for the sampling
  6482. 4:14:43period
  6483. 4:14:45if items are consistently found to be
  6484. 4:14:47outside the control limits on any given
  6485. 4:14:49day the production process is stopped
  6486. 4:14:52for the next day
  6487. 4:14:53let us now interpret the results of the
  6488. 4:14:55sampling
  6489. 4:14:57in this example as the sample size is
  6490. 4:14:59constant dpu or p-bar is used to
  6491. 4:15:03calculate the process capability
  6492. 4:15:06the total number of defectives is 34 and
  6493. 4:15:09the subgroup size is 10.
  6494. 4:15:11the total number of units is 10
  6495. 4:15:13multiplied by 24 which is 240.
  6496. 4:15:17the defects per unit is 0.0124
  6497. 4:15:21the defects per million opportunities is
  6498. 4:15:24obtained by multiplying the defects per
  6499. 4:15:26unit with 1 million which is 141
  6500. 4:15:29666.66
  6501. 4:15:32therefore by looking at the dpmo table
  6502. 4:15:36it can be said that the process is
  6503. 4:15:37currently working at 2.6 sigma or 86.4
  6504. 4:15:42percent yield
  6505. 4:15:44we will learn about process stability
  6506. 4:15:46studies in this screen
  6507. 4:15:48the activities carried out in the
  6508. 4:15:50measure phase are msa collection of data
  6509. 4:15:54statistical calculations and checking
  6510. 4:15:56for accuracy and validity
  6511. 4:15:59this is followed by a test for stability
  6512. 4:16:01as changes cannot be made to an unstable
  6513. 4:16:04process with a set of data believed to
  6514. 4:16:06be accurate the process is checked for
  6515. 4:16:08stability
  6516. 4:16:10this is important because if a process
  6517. 4:16:12is unstable no changes can be
  6518. 4:16:15implemented
  6519. 4:16:16why does a process become unstable
  6520. 4:16:19a process can become unstable due to
  6521. 4:16:21special causes of variation
  6522. 4:16:24multiple special causes of variation
  6523. 4:16:26lead to instability
  6524. 4:16:28a single special cause leads to an out
  6525. 4:16:30of control condition
  6526. 4:16:32run charts in minitab can be used to
  6527. 4:16:35check for process stability
  6528. 4:16:37let us look at the steps to plot a run
  6529. 4:16:39chart in minitab in the following screen
  6530. 4:16:42to plot a run chart in minitab first
  6531. 4:16:45enter the sample data collected to check
  6532. 4:16:47for stability
  6533. 4:16:49next click stat on the minitab window
  6534. 4:16:51followed by quality tools
  6535. 4:16:54next click run charts
  6536. 4:16:56select the column and choose the
  6537. 4:16:58subgroup size as two click ok
  6538. 4:17:02the graph shown on the screen is
  6539. 4:17:03interpreted by looking at the last four
  6540. 4:17:05values
  6541. 4:17:06if any of the p values is less than 0.05
  6542. 4:17:11the presence of special causes of
  6543. 4:17:13variation can be validated
  6544. 4:17:15this means there is a good chance that
  6545. 4:17:17the process will become unstable
  6546. 4:17:20in the following screen we will look at
  6547. 4:17:23process stability studies causes of
  6548. 4:17:25variation
  6549. 4:17:28variation can be due to two types of
  6550. 4:17:30causes
  6551. 4:17:31common causes of variation and special
  6552. 4:17:34causes of variation
  6553. 4:17:36click each type to learn more
  6554. 4:17:39common causes of variation are the many
  6555. 4:17:41sources of variation within a process
  6556. 4:17:44which have a stable and repeatable
  6557. 4:17:46distribution over a period
  6558. 4:17:48they contribute to a state of
  6559. 4:17:49statistical control where the output is
  6560. 4:17:52predictable
  6561. 4:17:54some other factors which do not always
  6562. 4:17:56act on the process can also cause
  6563. 4:17:58variation
  6564. 4:17:59these are special causes of variation
  6565. 4:18:02these are external to the process and
  6566. 4:18:05are irregular in nature
  6567. 4:18:07when present the process distribution
  6568. 4:18:09changes and the process output is not
  6569. 4:18:11stable over a period
  6570. 4:18:13special causes may result in defects and
  6571. 4:18:16need to be eliminated to bring the
  6572. 4:18:18process under control
  6573. 4:18:20run charts indicate the presence of
  6574. 4:18:22special causes of variation in the
  6575. 4:18:24process
  6576. 4:18:25if special causes are detected the
  6577. 4:18:28process has to be brought to a stop and
  6578. 4:18:30a root cause analysis has to be carried
  6579. 4:18:33out if the root cause analysis reveals
  6580. 4:18:36the special cause to be undesirable
  6581. 4:18:38corrective actions are taken to remove
  6582. 4:18:40the special cause
  6583. 4:18:43we will learn about verifying process
  6584. 4:18:45stability and normality in this screen
  6585. 4:18:48based on the type of variation of
  6586. 4:18:50process exhibits it can be verified if
  6587. 4:18:52the process is in control
  6588. 4:18:55if there are special causes of variation
  6589. 4:18:58the process output is not stable over
  6590. 4:19:00time
  6591. 4:19:01the process cannot be said to be in
  6592. 4:19:03control
  6593. 4:19:05conversely if there are only common
  6594. 4:19:07causes of variation in a process the
  6595. 4:19:10output forms a distribution that is
  6596. 4:19:12stable and predictable over time
  6597. 4:19:15a process being in control means the
  6598. 4:19:17process does not have any special causes
  6599. 4:19:20of variation
  6600. 4:19:22once a process is understood to be
  6601. 4:19:24stable the control chart data can be
  6602. 4:19:26used to calculate the process capability
  6603. 4:19:29indices
  6604. 4:19:30in the following screen we will discuss
  6605. 4:19:32process capability studies
  6606. 4:19:35process capability is the actual
  6607. 4:19:37variation in the process specification
  6608. 4:19:40to carry out a process capability study
  6609. 4:19:43first plan for data collection next
  6610. 4:19:46collect the data finally plot and
  6611. 4:19:48analyze the results
  6612. 4:19:50obtaining the appropriate sampling plan
  6613. 4:19:53for the process capability study depends
  6614. 4:19:55on the purpose and whether there are any
  6615. 4:19:57customer or standard requirements for
  6616. 4:19:59the study
  6617. 4:20:01for new processes or a project proposal
  6618. 4:20:04the project capability can be estimated
  6619. 4:20:06by a pilot run
  6620. 4:20:08let us look at the objectives of process
  6621. 4:20:10capability studies in the next screen
  6622. 4:20:13the objectives of a process capability
  6623. 4:20:15study are to establish a state of
  6624. 4:20:17control over a manufacturing process
  6625. 4:20:20and then maintain the state of control
  6626. 4:20:22over a period of time
  6627. 4:20:24on comparing the natural process limits
  6628. 4:20:26or the control limits within the
  6629. 4:20:28specification limits any of the
  6630. 4:20:30following outcomes is possible
  6631. 4:20:33first the process limits are found to
  6632. 4:20:35fall between the specification limits
  6633. 4:20:37this shows the process is running well
  6634. 4:20:40and no action is required
  6635. 4:20:42the second possibility is that the
  6636. 4:20:44process spread and the specification
  6637. 4:20:47spread are approximately the same
  6638. 4:20:50in this case the process is centered by
  6639. 4:20:52making an adjustment to the centering of
  6640. 4:20:54the process
  6641. 4:20:56this would bring the batch of products
  6642. 4:20:57within the specifications
  6643. 4:21:00the third possibility is that the
  6644. 4:21:02process limits fall outside the
  6645. 4:21:04specification limits
  6646. 4:21:06in this case reduce the variability by
  6647. 4:21:09partitioning the pieces of batches to
  6648. 4:21:11locate and target the largest offender
  6649. 4:21:14a design experiment can be used to
  6650. 4:21:16identify the primary source of variation
  6651. 4:21:19in the following screen we will learn
  6652. 4:21:21about identifying characteristics in
  6653. 4:21:23process capability
  6654. 4:21:25process capability deals with the
  6655. 4:21:27ability of the process to meet customer
  6656. 4:21:30requirements
  6657. 4:21:31therefore it is crucial that the
  6658. 4:21:33characteristics selected for a process
  6659. 4:21:35capability study indicates a key factor
  6660. 4:21:38in the quality of the product or process
  6661. 4:21:41also it should be possible to influence
  6662. 4:21:43the value of the characteristic by
  6663. 4:21:45adjusting the process
  6664. 4:21:47the operating conditions that affect the
  6665. 4:21:49characteristic should also be defined
  6666. 4:21:51and controlled
  6667. 4:21:53apart from these requirements other
  6668. 4:21:55factors determining the characteristics
  6669. 4:21:57to be measured are customer purchase
  6670. 4:21:59order requirements or industry standards
  6671. 4:22:02in the following screen we will look at
  6672. 4:22:04identifying specifications or tolerances
  6673. 4:22:07in process capability
  6674. 4:22:10the process specification or tolerances
  6675. 4:22:13are defined either by industry standards
  6676. 4:22:15based on customer requirements or by the
  6677. 4:22:18organization's engineering department in
  6678. 4:22:20consultation with the customer
  6679. 4:22:22a stability study followed by a
  6680. 4:22:24comprehensive capability study also
  6681. 4:22:27helps in identifying if the process mean
  6682. 4:22:29meets the target or the customer mean
  6683. 4:22:32the process capability study indicates
  6684. 4:22:34whether the process is capable it is
  6685. 4:22:37used to determine if the output
  6686. 4:22:39consistently meets specifications and
  6687. 4:22:41the probability of a defect or defective
  6688. 4:22:45this information is used to evaluate and
  6689. 4:22:47improve the process to meet the
  6690. 4:22:49tolerance requirements
  6691. 4:22:51in the following screen we will learn
  6692. 4:22:53about process performance indices
  6693. 4:22:57process performance is defined as a
  6694. 4:22:59statistical measurement of the outcome
  6695. 4:23:01of a process characteristic which may or
  6696. 4:23:04may not have been demonstrated to be in
  6697. 4:23:06a state of statistical control
  6698. 4:23:08in other words it is an estimate of the
  6699. 4:23:11process capability of a process during
  6700. 4:23:13its initial setup before it has been
  6701. 4:23:15brought into a state of statistical
  6702. 4:23:17control
  6703. 4:23:18it differs from the process capability
  6704. 4:23:21in that for process performance a state
  6705. 4:23:23of statistical control is not required
  6706. 4:23:26the three basic process performance
  6707. 4:23:28indices are process performance or pp
  6708. 4:23:32process performance index or ppk
  6709. 4:23:35and process capability index denoted as
  6710. 4:23:39ppm or cpm click each index to know more
  6711. 4:23:45pp stands for process performance it is
  6712. 4:23:48computed by subtracting the lower
  6713. 4:23:50specification limit from the upper
  6714. 4:23:52specification limit the whole divided by
  6715. 4:23:55natural process variation or six sigma
  6716. 4:24:00ppk is the process performance index and
  6717. 4:24:04a minimum of the values of the upper and
  6718. 4:24:06lower process capability indices
  6719. 4:24:09the upper and lower process capability
  6720. 4:24:11indices are calculated as shown on the
  6721. 4:24:14screen
  6722. 4:24:15ppu or upper process capability index is
  6723. 4:24:19given by the formula usl minus x divided
  6724. 4:24:22by 3s
  6725. 4:24:24ppl or lower process capability index is
  6726. 4:24:28given by x minus lsl divided by 3s
  6727. 4:24:32here x is process average better known
  6728. 4:24:35as x bar and s is sample standard
  6729. 4:24:38deviation
  6730. 4:24:41cpm denotes the process capability index
  6731. 4:24:45mean which accounts for the location of
  6732. 4:24:47the process average relative to a target
  6733. 4:24:50value
  6734. 4:24:51it can be calculated as shown on the
  6735. 4:24:53screen
  6736. 4:24:54here myu stands for process average
  6737. 4:24:58sigma symbol denotes the process
  6738. 4:25:00standard deviation
  6739. 4:25:01usl is the upper specification limit and
  6740. 4:25:05lsl is the lower specification limit
  6741. 4:25:08t is the target value which is typically
  6742. 4:25:11the center of the tolerance
  6743. 4:25:13x i is the sample reading and n is the
  6744. 4:25:16number of sample readings
  6745. 4:25:19we will look at the key terms in process
  6746. 4:25:21capability in this screen
  6747. 4:25:24zst or short term capability is the
  6748. 4:25:27potential performance of the process in
  6749. 4:25:29control at any given point of time
  6750. 4:25:32it is based on the sample collected in
  6751. 4:25:34the short term
  6752. 4:25:36the long term performance is denoted by
  6753. 4:25:38zlt
  6754. 4:25:39it is the actual performance of the
  6755. 4:25:41process over a given period of time
  6756. 4:25:44subgroups are several small samples
  6757. 4:25:46collected consecutively
  6758. 4:25:48each sample forms a subgroup
  6759. 4:25:51the subgroups are chosen so that the
  6760. 4:25:52data points are likely to be identical
  6761. 4:25:54within the subgroup but different
  6762. 4:25:57between two subgroups
  6763. 4:25:59the process shift is calculated by
  6764. 4:26:01subtracting the long-term capability
  6765. 4:26:03from the short-term capability
  6766. 4:26:06the process shift also reflects how well
  6767. 4:26:08a process is controlled
  6768. 4:26:10it is usually a factor of 1.5
  6769. 4:26:13let us look at short-term and long-term
  6770. 4:26:15process capability in the next screen
  6771. 4:26:19the concept of short-term and long-term
  6772. 4:26:21process shift is explained graphically
  6773. 4:26:23on this screen
  6774. 4:26:25there are three different samples taken
  6775. 4:26:26at time 1 time 2 and time 3. the smaller
  6776. 4:26:30waveforms represent the short-term
  6777. 4:26:32capability and they are joined with
  6778. 4:26:35their means to show the shift in
  6779. 4:26:36long-term performance
  6780. 4:26:38the long-term performance curve is shown
  6781. 4:26:40below with the target value marked in
  6782. 4:26:43the center
  6783. 4:26:44it is important to note that over a
  6784. 4:26:46period of time or subgroups a typical
  6785. 4:26:49process will shift by approximately 1.5
  6786. 4:26:52times the standard deviation
  6787. 4:26:54also long-term variation is more than
  6788. 4:26:57short-term variation
  6789. 4:26:59this difference is known as the sigma
  6790. 4:27:01shift and is an indicator of the process
  6791. 4:27:04control
  6792. 4:27:05the reasons for a process shift include
  6793. 4:27:08changes in operators raw material used
  6794. 4:27:11wear and tear and time periods
  6795. 4:27:14we will discuss the assumptions and
  6796. 4:27:16conventions of process variations in the
  6797. 4:27:18following screen
  6798. 4:27:20long-term variation is always longer
  6799. 4:27:22than short-term variation
  6800. 4:27:24click each term to know more
  6801. 4:27:27short-term variations are due to the
  6802. 4:27:29common causes the variance is inherent
  6803. 4:27:32in the process and known as the natural
  6804. 4:27:34variation
  6805. 4:27:36short-term variations show variation
  6806. 4:27:38within subgroup and are therefore called
  6807. 4:27:40within subgroup variation
  6808. 4:27:43they are usually a small number of
  6809. 4:27:44samples collected at short intervals
  6810. 4:27:47in short-term variation the variation
  6811. 4:27:49due to common causes are captured
  6812. 4:27:51however common causes are difficult to
  6813. 4:27:54identify and correct
  6814. 4:27:56the process may have to be redesigned to
  6815. 4:27:58remove common causes of variation
  6816. 4:28:02long-term variations are due to common
  6817. 4:28:05as well as special causes the added
  6818. 4:28:07variation or abnormal variation is due
  6819. 4:28:10to factors external to the usual process
  6820. 4:28:13long-term variation is also known as the
  6821. 4:28:16overall variation and is a sample
  6822. 4:28:18standard deviation for all the samples
  6823. 4:28:21put together
  6824. 4:28:22long-term variation shows variations
  6825. 4:28:24within the subgroup and between
  6826. 4:28:26subgroups
  6827. 4:28:28special causes increasing variation
  6828. 4:28:30include changes in operators raw
  6829. 4:28:33material and wear and tear
  6830. 4:28:35the special causes need to be identified
  6831. 4:28:37and corrected for process improvement
  6832. 4:28:41this screen explains how the factors of
  6833. 4:28:43stability capability spread and defect
  6834. 4:28:46summary are used to interpret the
  6835. 4:28:48process condition this table gives the
  6836. 4:28:51process condition for different levels
  6837. 4:28:53or types of variation with reference to
  6838. 4:28:55common causes and special causes
  6839. 4:28:58the table is read as follows
  6840. 4:29:01in the first scenario the process has
  6841. 4:29:03lesser common causes of variation or ccv
  6842. 4:29:07and no special causes of variation or
  6843. 4:29:10scv
  6844. 4:29:11in this case the variability is less the
  6845. 4:29:14capability is high the possibility of
  6846. 4:29:17defects is less and the process is said
  6847. 4:29:20to be capable and in control
  6848. 4:29:23next if the process has lesser ccv and
  6849. 4:29:26some scb are present then it has high
  6850. 4:29:30variability low capability and a high
  6851. 4:29:33possibility of defects
  6852. 4:29:35the process is said to be out of control
  6853. 4:29:38and incapable
  6854. 4:29:40the third possibility is that the
  6855. 4:29:42process has high ccv and no scv
  6856. 4:29:47in this case the variability is moderate
  6857. 4:29:49to high the capability is very low
  6858. 4:29:53and possibility of defects is very high
  6859. 4:29:57although the process is in control it is
  6860. 4:29:59incapable
  6861. 4:30:01finally at the other extreme is the
  6862. 4:30:04situation where the process has high ccv
  6863. 4:30:07and scv is also present
  6864. 4:30:10here the process has high variability
  6865. 4:30:13low capability high possibility of
  6866. 4:30:16defects and is out of control and
  6867. 4:30:19incapable
  6868. 4:30:20this table is a quick reference to
  6869. 4:30:22understand process conditions
  6870. 4:30:25in the next screen we will compare the
  6871. 4:30:27cpk and cp values
  6872. 4:30:30when cpk and cp values are compared
  6873. 4:30:33three outcomes are possible
  6874. 4:30:35when cpk is lesser than cp it can be
  6875. 4:30:38inferred that the mean is not centered
  6876. 4:30:41when cpk is equal to cp the inference is
  6877. 4:30:44that the process is accurate
  6878. 4:30:47the process is considered capable if cpk
  6879. 4:30:50is greater than one
  6880. 4:30:51this will happen only if variations are
  6881. 4:30:53in control
  6882. 4:30:55cpk can never be greater than cp
  6883. 4:30:58if this situation occurs the
  6884. 4:31:00calculations have to be rechecked
  6885. 4:31:03we will look at an example problem for
  6886. 4:31:05calculating process variation in the
  6887. 4:31:07following screen
  6888. 4:31:09the table on this screen shows data for
  6889. 4:31:11customer complaint resolution time over
  6890. 4:31:14a period of three weeks
  6891. 4:31:16each week's data forms a sub group
  6892. 4:31:18for example the resolution time is 48
  6893. 4:31:21hours for a particular case in week 1.
  6894. 4:31:24in week 2 the case takes up 50 hours and
  6895. 4:31:27in week 3 it takes about 49 hours
  6896. 4:31:30the subgroup size is 10.
  6897. 4:31:32let us understand how to calculate
  6898. 4:31:34long-term and short-term standard
  6899. 4:31:36deviations are calculated for this data
  6900. 4:31:40the average for each week is calculated
  6901. 4:31:42by dividing the total number of
  6902. 4:31:44complaints resolved by the subgroup size
  6903. 4:31:47a grand average is also calculated for
  6904. 4:31:50all the three weeks
  6905. 4:31:51the variations within subgroups and
  6906. 4:31:54between subgroups for each week are
  6907. 4:31:56calculated
  6908. 4:31:57this is followed by calculating the
  6909. 4:31:59total variations within and between
  6910. 4:32:01subgroups
  6911. 4:32:03overall variation is given by the sum of
  6912. 4:32:05total variation within subgroups and
  6913. 4:32:08total variation between subgroups
  6914. 4:32:11finally the standard deviations for the
  6915. 4:32:12short term and the long term are
  6916. 4:32:14calculated using the formula given on
  6917. 4:32:16the screen
  6918. 4:32:18the results for the process variation
  6919. 4:32:20calculations are as follows
  6920. 4:32:23the grand average for all three weeks is
  6921. 4:32:2547.5
  6922. 4:32:27the total variation within subgroups is
  6923. 4:32:301023.8
  6924. 4:32:33the total variation between subgroups is
  6925. 4:32:36161.67
  6926. 4:32:39both these variations are added to give
  6927. 4:32:41the overall variation of 1185.5
  6928. 4:32:47the short-term standard deviation is 6.2
  6929. 4:32:50and the long-term standard deviation is
  6930. 4:32:536.4
  6931. 4:32:55note that the overall variation can also
  6932. 4:32:57be calculated with the usual sample
  6933. 4:32:59variance formula
  6934. 4:33:02let us discuss the effective mean shift
  6935. 4:33:04on the process capability in this screen
  6936. 4:33:07the table given here shows the defect
  6937. 4:33:10level at different sigma multiple values
  6938. 4:33:12and different mean shifts
  6939. 4:33:14from the table it can be seen that when
  6940. 4:33:16the mean is centered within the
  6941. 4:33:17specification limits and the process
  6942. 4:33:20capability is 1 that is plus or minus 3s
  6943. 4:33:24fits within the specification limits
  6944. 4:33:27the dpmo is 2700 percent and the
  6945. 4:33:30probability of a good result is
  6946. 4:33:3399.73 percent
  6947. 4:33:35if the mean shifts by 1.5 sigma then a
  6948. 4:33:38tail moves outside the specification
  6949. 4:33:40limit to a greater extent
  6950. 4:33:42now the dpmo increases to over sixty six
  6951. 4:33:45thousand this is almost a twenty five
  6952. 4:33:48hundred percent increase in defects
  6953. 4:33:50if the process has a process capability
  6954. 4:33:53of two that is plus or minus six s fits
  6955. 4:33:56within the specification limits and the
  6956. 4:33:58mean shifts by 1.5 sigma then the
  6957. 4:34:01probability of a good result is
  6958. 4:34:0499.99966 percent
  6959. 4:34:06this is the same as a process with a
  6960. 4:34:08capability of 1.5 that is plus or minus
  6961. 4:34:124.5 s fitting within the specification
  6962. 4:34:15limits and no shift in the mean
  6963. 4:34:17the long-term and short-term capability
  6964. 4:34:19table shows the variations in
  6965. 4:34:21capabilities
  6966. 4:34:23for the purposes of six sigma the
  6967. 4:34:25assumption is that the long-term
  6968. 4:34:27variability will have a 1.5 s difference
  6969. 4:34:30from the short-term variability
  6970. 4:34:32as seen in statistical process control
  6971. 4:34:35this assumption can be challenged if
  6972. 4:34:37control charts are used and these kinds
  6973. 4:34:40of shifts are detected quickly
  6974. 4:34:42in the chart it can be seen that the
  6975. 4:34:44mean shift is negligible as the process
  6976. 4:34:47capability increases
  6977. 4:34:49therefore for a six sigma process the
  6978. 4:34:51long-term variation does not have much
  6979. 4:34:53effect
  6980. 4:34:55in the next screen we will look at key
  6981. 4:34:57concepts in process capability for
  6982. 4:34:59attribute data
  6983. 4:35:01the customary procedure for defining
  6984. 4:35:03process capability for attribute data is
  6985. 4:35:06to define the mean rate of
  6986. 4:35:07non-conformity
  6987. 4:35:09defects and defectives are examples of
  6988. 4:35:11non-conformity
  6989. 4:35:12defects per million opportunities or
  6990. 4:35:14dpmo is the measure of process
  6991. 4:35:17capability for attribute data
  6992. 4:35:20for this the mean and the standard
  6993. 4:35:22deviation for attribute data have to be
  6994. 4:35:24defined
  6995. 4:35:25for defectives p bar is used for
  6996. 4:35:27checking process capability for both
  6997. 4:35:29constant and variable sample sizes
  6998. 4:35:32for defects c bar and u bar are used for
  6999. 4:35:35constant and variable sample sizes
  7000. 4:35:38respectively
  7001. 4:35:39the p bar c bar and u bar are the
  7002. 4:35:42equivalent of the standard deviation
  7003. 4:35:44denoted by sigma for continuous data
  7004. 4:35:47in this topic we will learn about the
  7005. 4:35:49patterns of variation in detail
  7006. 4:35:52let us start with the classes of
  7007. 4:35:54distributions in the following screen
  7008. 4:35:57when data obtained from the measurement
  7009. 4:35:59phase is plotted on a chart it is
  7010. 4:36:02observed that it exhibits a variety of
  7011. 4:36:04distributions depending on the data type
  7012. 4:36:07and its source
  7013. 4:36:09these distribution patterns will help
  7014. 4:36:11you understand the data better
  7015. 4:36:14probability statistics and inferential
  7016. 4:36:17statistics
  7017. 4:36:18are the methods used to describe the
  7018. 4:36:20parameters for the classes of
  7019. 4:36:22distributions
  7020. 4:36:23click each method to know more
  7021. 4:36:26probability is based on the assumed
  7022. 4:36:29model of distribution and it is used to
  7023. 4:36:32find the chances of a certain outcome or
  7024. 4:36:34event to occur
  7025. 4:36:37statistics uses the measured data to
  7026. 4:36:40determine a model to describe the data
  7027. 4:36:42used
  7028. 4:36:44inferential statistics describe the
  7029. 4:36:46population parameters based on the
  7030. 4:36:48sample data using a particular model
  7031. 4:36:52in this screen we will discuss the types
  7032. 4:36:55of distributions there are two types of
  7033. 4:36:58distributions discrete distribution and
  7034. 4:37:01continuous distribution
  7035. 4:37:04discrete distribution includes binomial
  7036. 4:37:07distribution and poisson distribution
  7037. 4:37:10continuous distribution includes normal
  7038. 4:37:12distribution chi square distribution
  7039. 4:37:16t distribution and f distribution let us
  7040. 4:37:19learn about discrete probability
  7041. 4:37:21distribution in the following screen
  7042. 4:37:24discrete probability distribution is
  7043. 4:37:27characterized by the probability mass
  7044. 4:37:29function
  7045. 4:37:30it is important to be familiar with
  7046. 4:37:32discrete distributions while dealing
  7047. 4:37:34with discrete data some of the examples
  7048. 4:37:37of discrete probability distribution are
  7049. 4:37:40binomial distribution poisson
  7050. 4:37:42distribution negative binomial
  7051. 4:37:45distribution geometric distribution and
  7052. 4:37:48hyper geometric distribution
  7053. 4:37:51we will focus only on the two most
  7054. 4:37:53useful discrete distributions binomial
  7055. 4:37:56distribution and poisson distribution
  7056. 4:38:00like most probability distributions
  7057. 4:38:02these distributions also help in
  7058. 4:38:04predicting the sample behavior that has
  7059. 4:38:07been observed in a population let us
  7060. 4:38:10learn about binomial distribution in the
  7061. 4:38:13following screen
  7062. 4:38:16binomial distribution is a probability
  7063. 4:38:19distribution for discrete data
  7064. 4:38:21named after the swiss mathematician
  7065. 4:38:24jacob bernoulli it is an application of
  7066. 4:38:26popular knowledge to predict the sample
  7067. 4:38:29behavior
  7068. 4:38:30binomial distribution also describes the
  7069. 4:38:33discrete data as a result of a
  7070. 4:38:35particular process like the tossing of a
  7071. 4:38:38coin for a fixed number of times and the
  7072. 4:38:41success or failure in an interview
  7073. 4:38:44a process is known as bernoulli's
  7074. 4:38:46process when the process output has only
  7075. 4:38:49two possible values like defective or
  7076. 4:38:52okay pass or fail and yes or no
  7077. 4:38:56binomial distribution is used to deal
  7078. 4:38:59with defective items defect is any
  7079. 4:39:02non-compliance with a specification
  7080. 4:39:04defective is a product or service with
  7081. 4:39:07at least one defect
  7082. 4:39:09binomial distribution is most suitable
  7083. 4:39:11when the sample size is less than 30 and
  7084. 4:39:14less than 10 percent of the population
  7085. 4:39:17it is the percentage of non-defective
  7086. 4:39:19items provided the probability of
  7087. 4:39:21creating a defective item remains the
  7088. 4:39:24same over a period
  7089. 4:39:26let us look at the equation
  7090. 4:39:28the probability of exactly r successes
  7091. 4:39:31out of a sample size of n is denoted by
  7092. 4:39:35p of r
  7093. 4:39:36which is equal to ncr whole multiplied
  7094. 4:39:40by p to the power of r and one minus p
  7095. 4:39:43whole to the power of n minus r
  7096. 4:39:46in the equation b is the probability of
  7097. 4:39:49success
  7098. 4:39:50r is the number of successes desired and
  7099. 4:39:53n is the sample size
  7100. 4:39:55to continue discussing the binomial
  7101. 4:39:58distribution let us look at some of its
  7102. 4:40:00key calculations in the following screen
  7103. 4:40:03the mean of a binomial distribution is
  7104. 4:40:06denoted by mio and is given by n
  7105. 4:40:09multiplied by p
  7106. 4:40:10the standard deviation of a binomial
  7107. 4:40:13distribution is denoted by sigma which
  7108. 4:40:16is equal to n multiplied by p multiplied
  7109. 4:40:19by one minus p
  7110. 4:40:21the method of calculating factorials say
  7111. 4:40:24factorial of five
  7112. 4:40:26is the product of five four three two
  7113. 4:40:29and one
  7114. 4:40:30which is equal to one hundred twenty
  7115. 4:40:33similarly factorial of four is the
  7116. 4:40:36product of four three two and one
  7117. 4:40:39which is equal to twenty four
  7118. 4:40:42let us look at an example of calculating
  7119. 4:40:44binomial distribution in the next screen
  7120. 4:40:49suppose you wish to know the probability
  7121. 4:40:51of getting heads five times in eight
  7122. 4:40:54coin tosses
  7123. 4:40:55you can use the binomial equation for
  7124. 4:40:57the same
  7125. 4:40:58click the answer button to see how this
  7126. 4:41:00is done
  7127. 4:41:02the tossing of a coin has only two
  7128. 4:41:05outcomes heads and tails
  7129. 4:41:07it means that the probability of each
  7130. 4:41:09outcome is 0.5 and it remains fixed over
  7131. 4:41:13a period of time
  7132. 4:41:14additionally the outcomes are
  7133. 4:41:16statistically independent
  7134. 4:41:18in this case the probability of success
  7135. 4:41:21denoted by p is 0.5 the number of
  7136. 4:41:24successes desired is denoted by r which
  7137. 4:41:27is five and the sample size is denoted
  7138. 4:41:30by n which is eight
  7139. 4:41:32therefore the probability of five heads
  7140. 4:41:35is equal to factorial of eight c r which
  7141. 4:41:38is eight divided by factorial of five
  7142. 4:41:41and factorial of eight minus five whole
  7143. 4:41:44multiplied by zero point five to the
  7144. 4:41:46power of five multiplied by one minus
  7145. 4:41:48zero point five whole to the power of
  7146. 4:41:51eight minus five
  7147. 4:41:52this calculation gives a result of zero
  7148. 4:41:55point two one eight seven
  7149. 4:41:57which is equal to twenty one point eight
  7150. 4:42:00seven percent
  7151. 4:42:03let us learn about poisson distribution
  7152. 4:42:05in this screen
  7153. 4:42:07fuson distribution is named after simeon
  7154. 4:42:09denis posson and is also used for
  7155. 4:42:12discrete data
  7156. 4:42:13poisson distribution is an application
  7157. 4:42:16of the population knowledge to predict
  7158. 4:42:18the sample behavior
  7159. 4:42:20it is generally used for describing the
  7160. 4:42:22probability distribution of an event
  7161. 4:42:24with respect to time or space
  7162. 4:42:27some of the characteristics of poisson
  7163. 4:42:29distribution are as follows
  7164. 4:42:31poisson distribution describes the
  7165. 4:42:33discrete data resulting from a process
  7166. 4:42:35like the number of calls received by a
  7167. 4:42:37call center agent or the number of
  7168. 4:42:40accidents at a signal
  7169. 4:42:42unlike binomial distribution which deals
  7170. 4:42:44with binary discrete data poisson
  7171. 4:42:47distribution deals with integers which
  7172. 4:42:49can take any value poisson distribution
  7173. 4:42:52is suitable for analyzing situations
  7174. 4:42:54wherein the number of trials similar to
  7175. 4:42:56the sample size in binomial distribution
  7176. 4:42:59is large and tends towards infinity
  7177. 4:43:03additionally it is used in situations
  7178. 4:43:05where the probability of success in each
  7179. 4:43:08trial is very small almost tending
  7180. 4:43:10towards zero
  7181. 4:43:12this is the reason why poisson
  7182. 4:43:13distribution is applicable for
  7183. 4:43:15predicting the occurrence of rare events
  7184. 4:43:17like plane crashes car accidents etc and
  7185. 4:43:21is therefore widely used in the
  7186. 4:43:23insurance sector poisson distribution
  7187. 4:43:25can be used for predicting the number of
  7188. 4:43:27defects as well given a low defect
  7189. 4:43:30occurrence rate
  7190. 4:43:31let us look at the formula for
  7191. 4:43:33calculating poisson distribution in the
  7192. 4:43:35next screen the poisson distribution for
  7193. 4:43:37a probability of exactly x occurrences
  7194. 4:43:41is given by p of x equals to lambda to
  7195. 4:43:44the power of x multiplied with log e to
  7196. 4:43:46the power of minus lambda whole divided
  7197. 4:43:48by factorial of x
  7198. 4:43:51in this equation lambda is the mean
  7199. 4:43:53number of occurrences during the
  7200. 4:43:55interval
  7201. 4:43:56x is the number of occurrences desired
  7202. 4:43:59and e is the base of natural logarithm
  7203. 4:44:02which is equal to 2.71828
  7204. 4:44:05the mean of the poisson distribution is
  7205. 4:44:08given by the lambda and the standard
  7206. 4:44:10deviation of a poisson distribution is
  7207. 4:44:12given by sigma which is the square root
  7208. 4:44:15of lambda
  7209. 4:44:16let us look at an example to calculate
  7210. 4:44:19poisson distribution in the next screen
  7211. 4:44:22the past records of a road junction
  7212. 4:44:24which is accident prone show a mean
  7213. 4:44:27number of five accidents per week at
  7214. 4:44:29this junction
  7215. 4:44:30assume that the number of accidents
  7216. 4:44:32follows a poisson distribution and
  7217. 4:44:35calculate the probability of any number
  7218. 4:44:37of accidents happening in a week
  7219. 4:44:39click the button to know the answer
  7220. 4:44:43given the situation you know that the
  7221. 4:44:45value of lambda or mean is five
  7222. 4:44:48so p of zero that is the probability of
  7223. 4:44:50zero accidents per week is calculated as
  7224. 4:44:53five to the power of 0 multiplied by e
  7225. 4:44:56to the power of minus 5 whole divided by
  7226. 4:44:59factorial of zero
  7227. 4:45:01the answer is
  7228. 4:45:030.006
  7229. 4:45:05applying the same formula the
  7230. 4:45:07probability of one accident per week is
  7231. 4:45:090.03
  7232. 4:45:11the probability of more than two
  7233. 4:45:13accidents per week is one minus the sum
  7234. 4:45:16of probabilities of zero one and two
  7235. 4:45:19accidents
  7236. 4:45:20which is 0.884
  7237. 4:45:23in other words the probability is 88.4
  7238. 4:45:26percent
  7239. 4:45:29let us learn about continuous
  7240. 4:45:31probability distribution in this screen
  7241. 4:45:34continuous probability distribution is
  7242. 4:45:37characterized by the probability density
  7243. 4:45:40function
  7244. 4:45:41a variable is said to be continuous if
  7245. 4:45:44the range of possible values falls along
  7246. 4:45:46a continuum
  7247. 4:45:48for example loudness of cheering at a
  7248. 4:45:50ball game weight of cookies in a package
  7249. 4:45:54length of a pen
  7250. 4:45:55or the time required to assemble a car
  7251. 4:45:59continuous probability distributions
  7252. 4:46:01help in predicting the sample behavior
  7253. 4:46:04observed in a population
  7254. 4:46:07let us learn about normal distribution
  7255. 4:46:09in this screen
  7256. 4:46:11the normal or gaussian distribution is a
  7257. 4:46:13continuous probability distribution
  7258. 4:46:16the normal distribution is represented
  7259. 4:46:18as n and depends on two factors
  7260. 4:46:21me u which stands for mean and sigma
  7261. 4:46:24which gives the standard deviation of
  7262. 4:46:26the data points
  7263. 4:46:28normal distribution normally has a
  7264. 4:46:30higher frequency of values around the
  7265. 4:46:32mean and lesser occurrences away from it
  7266. 4:46:36it is often used as a first
  7267. 4:46:38approximation to describe real valued
  7268. 4:46:40random variables that tend to cluster
  7269. 4:46:42around a single mean value
  7270. 4:46:45the distribution is bell shaped and
  7271. 4:46:47symmetrical the total area under the
  7272. 4:46:49normal curve is 1 which is p of x
  7273. 4:46:53various types of data such as body
  7274. 4:46:55weight height the output of a
  7275. 4:46:56manufacturing device etc follow the
  7276. 4:46:59normal distribution
  7277. 4:47:01additionally normal distribution is
  7278. 4:47:03continuous and symmetrical with the
  7279. 4:47:05tails asymptotic to the x-axis which
  7280. 4:47:08means they touch the x-axis at infinity
  7281. 4:47:11let us continue to discuss normal
  7282. 4:47:13distribution in the following screen
  7283. 4:47:17in a normal distribution to standardize
  7284. 4:47:19comparisons of dispersion or the
  7285. 4:47:21different measurement units like inches
  7286. 4:47:23meters grams etc
  7287. 4:47:25a standard z variable is used the uses
  7288. 4:47:28of z value are as follows
  7289. 4:47:31while the value of z or the number of
  7290. 4:47:34standard deviations is unique for each
  7291. 4:47:36probability within the normal
  7292. 4:47:38distribution
  7293. 4:47:39it helps in finding probabilities of
  7294. 4:47:41data points anywhere within the
  7295. 4:47:43distribution
  7296. 4:47:44it is dimensionless as well that is it
  7297. 4:47:47has no units such as millimeters liters
  7298. 4:47:50coulombs etc
  7299. 4:47:52there are different formulas to arrive
  7300. 4:47:54at the normal distribution
  7301. 4:47:56we will focus on one commonly used
  7302. 4:47:58formula for calculating normal
  7303. 4:48:00distribution which is
  7304. 4:48:02z equals y minus mu whole divided by
  7305. 4:48:05sigma
  7306. 4:48:06here z is the number of standard
  7307. 4:48:08deviations between y and the mean
  7308. 4:48:11denoted by miu
  7309. 4:48:13why is the value of the data point in
  7310. 4:48:15concern
  7311. 4:48:16me u is mean of the population or data
  7312. 4:48:18points and sigma is the standard
  7313. 4:48:21deviation of the population or data
  7314. 4:48:23points
  7315. 4:48:24let us look at an example for
  7316. 4:48:26calculating normal distribution in the
  7317. 4:48:28following screen
  7318. 4:48:31suppose the time taken to resolve
  7319. 4:48:33customer problems follows a normal
  7320. 4:48:35distribution with a mean of 250 hours
  7321. 4:48:38and standard deviation of twenty three
  7322. 4:48:40hours
  7323. 4:48:41find the probability of a problem
  7324. 4:48:43resolution taking more than three
  7325. 4:48:45hundred hours
  7326. 4:48:46click the button to know the answer
  7327. 4:48:50in this case y is equal to three hundred
  7328. 4:48:52me u equals 250 and sigma equals 23.
  7329. 4:48:57applying the normal distribution formula
  7330. 4:48:59z is equal to 300 minus 250 whole
  7331. 4:49:03divided by 23. the result is 2.17
  7332. 4:49:08when you look at the normal distribution
  7333. 4:49:10table the z value of 2.17 covers an area
  7334. 4:49:14of
  7335. 4:49:150.98499 under itself
  7336. 4:49:18this means the probability of a problem
  7337. 4:49:21taking 0 to 300 hours to be resolved is
  7338. 4:49:2498.5 percent and therefore the chances
  7339. 4:49:27of a problem resolution taking more than
  7340. 4:49:30300 hours is 1.5 percent
  7341. 4:49:34let us understand the usage of z table
  7342. 4:49:36in this screen
  7343. 4:49:38the graphical representation of z table
  7344. 4:49:40usage is given here
  7345. 4:49:43the probability of areas under the curve
  7346. 4:49:45is one
  7347. 4:49:46for the actual value one can identify
  7348. 4:49:49the z score by using the z table
  7349. 4:49:52as shown this probability is the area
  7350. 4:49:55under the curve to the left of point
  7351. 4:49:57plus a to zero
  7352. 4:50:00using the actual data when you calculate
  7353. 4:50:02mean and standard deviation and the
  7354. 4:50:05values are 25 and 5 respectively it is
  7355. 4:50:08the normal distribution
  7356. 4:50:10if the same data is standardized to a
  7357. 4:50:13mean value of 0 and standard deviation
  7358. 4:50:16value of 1
  7359. 4:50:17it is the standard normal distribution
  7360. 4:50:20in the next screen we will take a look
  7361. 4:50:22at the z table
  7362. 4:50:25the z table gives the probability that z
  7363. 4:50:28is between zero and a positive number
  7364. 4:50:31there are different forms of normal
  7365. 4:50:33distribution z tables followed globally
  7366. 4:50:36the most common form of z table with
  7367. 4:50:38positive z scores is shown here
  7368. 4:50:41the value of a called the percentage
  7369. 4:50:44point is given along the borders of the
  7370. 4:50:46table in bold and is to two decimal
  7371. 4:50:49places
  7372. 4:50:51the values in the main table are the
  7373. 4:50:53probabilities that z is between zero and
  7374. 4:50:56plus a
  7375. 4:50:58note that the values running down the
  7376. 4:50:59table are to one decimal place
  7377. 4:51:02the numbers along the column change only
  7378. 4:51:04for the second decimal place
  7379. 4:51:07let us look at some examples on how to
  7380. 4:51:09use a z table in the following screen
  7381. 4:51:13let us find the value of p of z less
  7382. 4:51:15than zero
  7383. 4:51:17the table is not needed to find the
  7384. 4:51:19answer once we know that the variable z
  7385. 4:51:22takes a value less than or equal to zero
  7386. 4:51:26first the area under the curve is one
  7387. 4:51:28and second the curve is symmetrical
  7388. 4:51:31about z equals zero
  7389. 4:51:33hence there is zero point five or fifty
  7390. 4:51:35percent above chance of z equals zero
  7391. 4:51:38and zero point five or fifty percent
  7392. 4:51:41below chance of z equals zero
  7393. 4:51:46let us find the value of p of z greater
  7394. 4:51:48than one point one two
  7395. 4:51:51in this case the chance of z is greater
  7396. 4:51:53than a number in this case 1.12
  7397. 4:51:57you can find this by using the following
  7398. 4:51:59fact
  7399. 4:52:00the opposite or complement of an event
  7400. 4:52:03of a is the event of not a
  7401. 4:52:06that is the opposite or complement of
  7402. 4:52:08event a occurring is the event a not
  7403. 4:52:11occurring
  7404. 4:52:12its probability is given by p of not a
  7405. 4:52:15equals one minus p of a
  7406. 4:52:18in other words p of z greater than one
  7407. 4:52:20point one two is one minus the opposite
  7408. 4:52:23which is p of z lesser than 1.12
  7409. 4:52:28using the table p of z less than 1.12
  7410. 4:52:31equals 0.5 plus p of 0 less than z less
  7411. 4:52:36than 1.12 equals 0.5 plus
  7412. 4:52:400.3686 which is
  7413. 4:52:430.8686
  7414. 4:52:45hence the answer is p of z greater than
  7415. 4:52:481.12 equals 1 minus 0.86
  7416. 4:52:53which is 0.1314
  7417. 4:52:56note the answer is less than 0.5
  7418. 4:53:00let us find the value of p of z lies
  7419. 4:53:03between 0 and 1.12
  7420. 4:53:06in this case where z falls within an
  7421. 4:53:08interval the probability can be read
  7422. 4:53:10straight off the table
  7423. 4:53:12p of z lies between 0 and 1.12 equals
  7424. 4:53:160.3686
  7425. 4:53:19we will learn about chi-square
  7426. 4:53:21distribution in this screen
  7427. 4:53:23chi-square distribution is also known as
  7428. 4:53:26chi squared or chi-square distribution
  7429. 4:53:30chi squared with k-1 degrees of freedom
  7430. 4:53:33is the distribution of a sum of the
  7431. 4:53:35squares of k independent standard normal
  7432. 4:53:38random variables
  7433. 4:53:40the chi-squared distribution is one of
  7434. 4:53:42the most widely used probability
  7435. 4:53:44distributions in inferential statistics
  7436. 4:53:47it is also known as hypothesis testing
  7437. 4:53:51and the distribution is used in
  7438. 4:53:52hypothesis tests
  7439. 4:53:54when used in hypothesis tests it only
  7440. 4:53:57needs one sample for the test to be
  7441. 4:53:59conducted
  7442. 4:54:01degree of freedom is k1 where k is the
  7443. 4:54:05sample size
  7444. 4:54:06click the button to view the chi-square
  7445. 4:54:09distribution formula
  7446. 4:54:12chi-square calculated or sigma or the
  7447. 4:54:15chi-square index equals f of o minus f
  7448. 4:54:18of e
  7449. 4:54:19the whole square divided by f of e
  7450. 4:54:22here f of o stands for an observed
  7451. 4:54:25frequency and f of e stands for an
  7452. 4:54:28expected frequency determined through a
  7453. 4:54:31contingency table
  7454. 4:54:33we will learn about the chi-square
  7455. 4:54:34distribution in detail in the later part
  7456. 4:54:37of this lesson
  7457. 4:54:39let us proceed to the next screen to
  7458. 4:54:41discuss t distribution
  7459. 4:54:45the t distribution method is the most
  7460. 4:54:47appropriate method to be used in the
  7461. 4:54:49following situations
  7462. 4:54:51when you have a sample size of less than
  7463. 4:54:5430 when the population standard
  7464. 4:54:56deviation is not known
  7465. 4:54:58when the population is approximately
  7466. 4:55:00normal
  7467. 4:55:01unlike the normal distribution a t
  7468. 4:55:04distribution is lower at the mean and
  7469. 4:55:06higher at the tails as seen in the image
  7470. 4:55:10t distribution is used for hypothesis
  7471. 4:55:12testing
  7472. 4:55:14also as seen in the image the t
  7473. 4:55:16distribution is symmetrical in shape but
  7474. 4:55:19flatter than the normal distribution
  7475. 4:55:22as the sample size increases the t
  7476. 4:55:25distribution approaches normality
  7477. 4:55:27for every possible sample size or
  7478. 4:55:30degrees of freedom there is a different
  7479. 4:55:33t distribution
  7480. 4:55:35let us learn about f distribution in the
  7481. 4:55:37following screen
  7482. 4:55:39the f distribution is a ratio of two
  7483. 4:55:42chi-square distributions
  7484. 4:55:44a specific f distribution is denoted by
  7485. 4:55:47the ratio of the degrees of freedom for
  7486. 4:55:50the numerator chi square
  7487. 4:55:52and the degrees of freedom for the
  7488. 4:55:54denominator chi-square
  7489. 4:55:57the f-test is performed to calculate and
  7490. 4:55:59observe if the standard deviations or
  7491. 4:56:02variances of two processes are
  7492. 4:56:04significantly different
  7493. 4:56:07the project teams are usually concerned
  7494. 4:56:09about reducing the process variance
  7495. 4:56:12as per the formula f calculated equals
  7496. 4:56:15s1 square divided by s2 square
  7497. 4:56:19where s1 and s2 are the standard
  7498. 4:56:21deviations of the two samples
  7499. 4:56:24if the f calculated is 1
  7500. 4:56:27it implies there is no difference in the
  7501. 4:56:29variance
  7502. 4:56:31if s 1 is greater than s 2
  7503. 4:56:34then the numerator must be greater than
  7504. 4:56:36the denominator
  7505. 4:56:37in other words df1 equals n1 minus 1 and
  7506. 4:56:42df2 equals n2 minus 1.
  7507. 4:56:46from the f distribution table you can
  7508. 4:56:49easily find out the critical f
  7509. 4:56:51distribution at alpha and the degrees of
  7510. 4:56:54freedom of the samples of two different
  7511. 4:56:56processes df1 and df2
  7512. 4:57:00let us proceed to the next topic of this
  7513. 4:57:02lesson in the following screen
  7514. 4:57:05in this topic we will discuss
  7515. 4:57:07exploratory data analysis in detail
  7516. 4:57:11let us learn about multivariate studies
  7517. 4:57:13in the following screen
  7518. 4:57:16multivariate studies or multi-variable
  7519. 4:57:19studies are used to analyze variation in
  7520. 4:57:21a process
  7521. 4:57:23analyzing variation helps in
  7522. 4:57:25investigating the stability of a process
  7523. 4:57:29more stable the process less is the
  7524. 4:57:31variation
  7525. 4:57:32multivariate studies also help in
  7526. 4:57:34identifying areas to be investigated
  7527. 4:57:37finally they help in breaking down the
  7528. 4:57:39variation into components to make the
  7529. 4:57:42required improvements
  7530. 4:57:44multivariate studies classify variation
  7531. 4:57:46sources into three major types
  7532. 4:57:49positional cyclical and temporal
  7533. 4:57:52click each type to learn more
  7534. 4:57:55positional variation occurs within a
  7535. 4:57:58single piece or a product
  7536. 4:58:00variation in pieces of a batch is also
  7537. 4:58:03an example of positional variation
  7538. 4:58:06in positional variation measurements at
  7539. 4:58:08different locations of a piece would
  7540. 4:58:10produce different values
  7541. 4:58:13suppose a company is manufacturing a
  7542. 4:58:15metal plate of thickness one inch and
  7543. 4:58:18the plate thickness is different at many
  7544. 4:58:20points
  7545. 4:58:21it is an example of positional variation
  7546. 4:58:24some of the other examples can be pallet
  7547. 4:58:27stacking in a truck
  7548. 4:58:28temperature gradient in an oven
  7549. 4:58:31variation observed from cavity to cavity
  7550. 4:58:33within a mold
  7551. 4:58:35region of a country and line on invoice
  7552. 4:58:40cyclical variation occurs when
  7553. 4:58:43measurement differs from piece to piece
  7554. 4:58:45or product to product but over a short
  7555. 4:58:47period of time
  7556. 4:58:49time is important because certain
  7557. 4:58:51measurements may change if a product
  7558. 4:58:53such as a hot metal sheet is measured
  7559. 4:58:55after a long interval
  7560. 4:58:57if the measurement at the same location
  7561. 4:58:59in a piece varies with different pieces
  7562. 4:59:02it is an example of cyclical variation
  7563. 4:59:05other examples of cyclical variations
  7564. 4:59:08are match to batch variation
  7565. 4:59:10lot to lot variation and account
  7566. 4:59:13activity week to week
  7567. 4:59:16temporal variation occurs over a longer
  7568. 4:59:19period of time
  7569. 4:59:20such as machine wear and tear and
  7570. 4:59:22changes in efficiency of an operator
  7571. 4:59:24before and after lunch
  7572. 4:59:27temporal variations may also be seasonal
  7573. 4:59:30if the range of positional variation in
  7574. 4:59:32a piece is more in winter than in summer
  7575. 4:59:35it is an example of temporal variation
  7576. 4:59:38the variation may occur because of
  7577. 4:59:40unfavorable working conditions in winter
  7578. 4:59:43process drift performance before and
  7579. 4:59:45after breaks seasonal and shift based
  7580. 4:59:47differences month-to-month closings and
  7581. 4:59:50quarterly returns can be examples of
  7582. 4:59:53temporal variation
  7583. 4:59:56we will learn about creating a
  7584. 4:59:57multivariate chart in this screen
  7585. 5:00:00the outcome of multivariate studies is
  7586. 5:00:03the multivariate chart
  7587. 5:00:04it depicts the type of variation in the
  7588. 5:00:07product and helps in identifying the
  7589. 5:00:09root cause
  7590. 5:00:11there are five major steps involved in
  7591. 5:00:13creating a multivariate chart
  7592. 5:00:16they are select process and
  7593. 5:00:17characteristics
  7594. 5:00:19decide sample size
  7595. 5:00:21create a tabulation sheet
  7596. 5:00:24plot the chart and link the observed
  7597. 5:00:27values
  7598. 5:00:28click each step to learn more
  7599. 5:00:32the first step is to select the process
  7600. 5:00:34and the relevant characteristics to be
  7601. 5:00:36investigated
  7602. 5:00:38for example selecting the process where
  7603. 5:00:40the plate of one inch thickness is being
  7604. 5:00:42manufactured
  7605. 5:00:44in this process four equipment numbered
  7606. 5:00:46one to four produce the one-inch plates
  7607. 5:00:49the characteristic to be measured is the
  7608. 5:00:51thickness of the plate ranging from 0.95
  7609. 5:00:55inch to 1.05 inches
  7610. 5:00:58any plate thickness outside this range
  7611. 5:01:00is a defect
  7612. 5:01:04the second step is to decide the sample
  7613. 5:01:06size and the frequency of data
  7614. 5:01:08collection
  7615. 5:01:10in this example the sample size is five
  7616. 5:01:13pieces per equipment and the frequency
  7617. 5:01:15of collecting data is every two hours
  7618. 5:01:18starting from eight in the morning to
  7619. 5:01:20two in the afternoon
  7620. 5:01:22then the tabulation sheet is created
  7621. 5:01:24where the data will be recorded
  7622. 5:01:27so one should measure the thickness of
  7623. 5:01:28the plate being produced by the four
  7624. 5:01:30equipment at a data collection frequency
  7625. 5:01:33of two hours
  7626. 5:01:36the third step is to create a tabulation
  7627. 5:01:39sheet
  7628. 5:01:40in this example the tabulation sheet
  7629. 5:01:42with data records contains the columns
  7630. 5:01:45with time equipment number and thickness
  7631. 5:01:48as headers
  7632. 5:01:51the fourth step is to plot the chart
  7633. 5:01:54in this example a chart can be plotted
  7634. 5:01:57with time on the x-axis and plate
  7635. 5:02:00thickness on the y-axis
  7636. 5:02:04the last step is to link the observed
  7637. 5:02:06values
  7638. 5:02:07in this example the observed values can
  7639. 5:02:09be linked by appropriate lines
  7640. 5:02:12we will continue to learn about creating
  7641. 5:02:15a multivariate chart in this screen
  7642. 5:02:18the path to create a multivariate chart
  7643. 5:02:20in minitab is by selecting stat then
  7644. 5:02:23quality tools followed by multivariate
  7645. 5:02:26chart
  7646. 5:02:28the multivariate chart created from the
  7647. 5:02:30data recorded is shown here
  7648. 5:02:32the upper specification limit of 1.05
  7649. 5:02:36inches and the lower specification limit
  7650. 5:02:38of 0.95 inches has been marked by green
  7651. 5:02:42lines
  7652. 5:02:43data outside these lines are defects
  7653. 5:02:47the blue dots show the positional
  7654. 5:02:49variation
  7655. 5:02:50the dots are the measurements of pieces
  7656. 5:02:52in a batch of any single equipment
  7657. 5:02:55the black lines join the mean of the
  7658. 5:02:57data recorded from the equipment
  7659. 5:03:00the mean of the data recorded from the
  7660. 5:03:02products of equipment number three
  7661. 5:03:05is much below the similar mean of other
  7662. 5:03:07equipment
  7663. 5:03:09this shows that equipment number three
  7664. 5:03:11is producing more defects than the other
  7665. 5:03:14equipment
  7666. 5:03:15the red line is the mean of the data
  7667. 5:03:17recorded at a particular time
  7668. 5:03:20the red line rises toward the right
  7669. 5:03:22which means the data points shift up
  7670. 5:03:25after 12 pm
  7671. 5:03:27this may be because of the change in
  7672. 5:03:29operator efficiency after a lunch break
  7673. 5:03:32at 12 pm
  7674. 5:03:34multivariate chart helps us visually
  7675. 5:03:36depict the variations and establish the
  7676. 5:03:39root causes of variations
  7677. 5:03:42in the next screen we will learn about
  7678. 5:03:44simple linear correlation
  7679. 5:03:47correlation means association between
  7680. 5:03:49variables
  7681. 5:03:51simple linear regression and multiple
  7682. 5:03:53regression techniques are very important
  7683. 5:03:56as they help in validating the
  7684. 5:03:58association of x with y
  7685. 5:04:01the coefficient correlation shows the
  7686. 5:04:04strength of the relationship between y
  7687. 5:04:06and x
  7688. 5:04:08to associate y with a single x
  7689. 5:04:11and statistically validate the
  7690. 5:04:13relationship correlation is used in
  7691. 5:04:16excel
  7692. 5:04:17use equals corel open bracket close
  7693. 5:04:20bracket function to calculate
  7694. 5:04:22correlation coefficient
  7695. 5:04:25the dependent variable y may depend on
  7696. 5:04:28many independent variables x
  7697. 5:04:31but correlation is used to find the
  7698. 5:04:33behavior of y as one of the x's changes
  7699. 5:04:37correlation helps us to predict the
  7700. 5:04:39direction of movement in values in y
  7701. 5:04:42when x changes
  7702. 5:04:44statistical significance of this
  7703. 5:04:46movement is denoted by correlation
  7704. 5:04:49coefficient r
  7705. 5:04:51it is also known as pearson's
  7706. 5:04:52coefficient of correlation
  7707. 5:04:55in any correlation the value of the
  7708. 5:04:57correlation coefficient is always
  7709. 5:04:59between minus one and plus one
  7710. 5:05:02positive value of r denotes the
  7711. 5:05:04direction of movement in both variables
  7712. 5:05:06is the same
  7713. 5:05:08as x increases y also increases and vice
  7714. 5:05:12versa
  7715. 5:05:13negative value of r denotes that the
  7716. 5:05:16direction of movement in both variables
  7717. 5:05:18is in inverse fashion
  7718. 5:05:20as x increases y decreases and as x
  7719. 5:05:24decreases y increases
  7720. 5:05:27when the value of r is zero it means
  7721. 5:05:30that there is no correlation between the
  7722. 5:05:32two variables
  7723. 5:05:34higher the absolute value of r stronger
  7724. 5:05:37the correlation between y and x
  7725. 5:05:40absolute value of a number is its value
  7726. 5:05:43without the sign
  7727. 5:05:45plus four has an absolute value of four
  7728. 5:05:48and minus four
  7729. 5:05:50again has an absolute value of four
  7730. 5:05:53an r value of greater than plus 0.85
  7731. 5:05:57or lesser than minus 0.85
  7732. 5:06:00indicates a strong correlation
  7733. 5:06:03hence r value of minus 0.95
  7734. 5:06:06shows a stronger correlation than the r
  7735. 5:06:08value of minus 0.74
  7736. 5:06:12the next screen will elaborate on
  7737. 5:06:14correlation with the help of an example
  7738. 5:06:16and illustrations through scatter plots
  7739. 5:06:20the four graphs on the screen are
  7740. 5:06:22scatter plots displaying four different
  7741. 5:06:24levels of correlation
  7742. 5:06:26correlation measures the linear
  7743. 5:06:28association between the dependent
  7744. 5:06:30variable or output variable y and one
  7745. 5:06:34independent or input variable x
  7746. 5:06:37as can be deduced from the graphs
  7747. 5:06:40a definite pattern emerges as the
  7748. 5:06:42absolute value of correlation
  7749. 5:06:43coefficient r increases
  7750. 5:06:46it is easy to see a pattern in r value
  7751. 5:06:49of 0.9 and above than to see a pattern
  7752. 5:06:52in r value of 0.07
  7753. 5:06:55it is difficult to find a pattern below
  7754. 5:06:57correlation coefficient of 0.5 click the
  7755. 5:07:01example button to know more
  7756. 5:07:04to understand how correlation helps let
  7757. 5:07:07us consider an example
  7758. 5:07:09a correlation test was performed on the
  7759. 5:07:11scores of a set of students from their
  7760. 5:07:14first grade high school and under
  7761. 5:07:16graduation
  7762. 5:07:17the undergraduation score was the
  7763. 5:07:19dependent variable and first grade score
  7764. 5:07:22the independent variable
  7765. 5:07:24the value of correlation coefficient r
  7766. 5:07:27was calculated to be 0.29
  7767. 5:07:30and the correlation between
  7768. 5:07:31undergraduation scores and high school
  7769. 5:07:34scores was 0.45
  7770. 5:07:37this means the high school scores have
  7771. 5:07:39higher correlation compared to the first
  7772. 5:07:41grade scores
  7773. 5:07:43this states the performance of students
  7774. 5:07:45in high school is a better indicator of
  7775. 5:07:47their performance in undergraduation
  7776. 5:07:50than their performance in the first
  7777. 5:07:51grade
  7778. 5:07:53although the correlation exists as both
  7779. 5:07:55the values of r are less than 0.85
  7780. 5:07:59it will be difficult to draw a straight
  7781. 5:08:01line on the scanner plot
  7782. 5:08:04in this screen we will learn about
  7783. 5:08:06regression although correlation gives
  7784. 5:08:08the direction of movement of the
  7785. 5:08:10dependent variable y as independent
  7786. 5:08:13variable x changes
  7787. 5:08:15it does not provide the extent of the
  7788. 5:08:17movement of y as x changes
  7789. 5:08:20this degree of movement can be
  7790. 5:08:22calculated using regression
  7791. 5:08:25if a high percentage of variability in y
  7792. 5:08:28is explained by changes in x
  7793. 5:08:31one can use the model to write a
  7794. 5:08:32transfer equation y is equal to f x and
  7795. 5:08:36use the same equation to predict future
  7796. 5:08:39values of y given x and x given y
  7797. 5:08:43the output of regression on y and x is a
  7798. 5:08:46transfer function equation that can
  7799. 5:08:48predict values of y for any other value
  7800. 5:08:52of x
  7801. 5:08:53transfer function is generally denoted
  7802. 5:08:55by f and the equation is written as y
  7803. 5:08:59equals to f of x
  7804. 5:09:01y can be regressed on one or more x's
  7805. 5:09:04simultaneously
  7806. 5:09:06simple linear regression is for 1x and
  7807. 5:09:09multiple linear regression is for more
  7808. 5:09:12than one x
  7809. 5:09:13the next screen will focus on key
  7810. 5:09:15concepts of regression
  7811. 5:09:19there are two key concepts of regression
  7812. 5:09:22transfer function to control y and vital
  7813. 5:09:25x click each concept to learn more
  7814. 5:09:29the output of regression is a transfer
  7815. 5:09:32function f of x
  7816. 5:09:34although the transfer function f of x
  7817. 5:09:37gives the degree of movement in y as x
  7818. 5:09:40changes
  7819. 5:09:41it is not the correct transfer function
  7820. 5:09:43to control y as there may be a low level
  7821. 5:09:46of correlation between the two
  7822. 5:09:50the main thrust of regression is to
  7823. 5:09:52discover whether a significant
  7824. 5:09:54statistical relationship exists between
  7825. 5:09:56y and a particular x that is by looking
  7826. 5:10:00at p values
  7827. 5:10:02based on regression one can infer the
  7828. 5:10:04vital x and eliminate the unimportant
  7829. 5:10:07x's
  7830. 5:10:08the analyze phase helps in understanding
  7831. 5:10:11if there is statistical relevance
  7832. 5:10:13between y and x if the relevance is
  7833. 5:10:16established using metrics from
  7834. 5:10:18regression analysis
  7835. 5:10:20one can move forward with the tests
  7836. 5:10:22the simple linear regression or slr
  7837. 5:10:26should be used as a statistical
  7838. 5:10:28validation tool in the beginning of this
  7839. 5:10:30phase
  7840. 5:10:33in this screen we will understand the
  7841. 5:10:35concept of simple linear regression
  7842. 5:10:38a simple linear regression equation is a
  7843. 5:10:41fitted linear equation and is
  7844. 5:10:44represented by the equation shown here
  7845. 5:10:47in this equation y is the dependent
  7846. 5:10:50variable and x is the independent
  7847. 5:10:52variable
  7848. 5:10:53a is the intercept of the fitted line on
  7849. 5:10:56the y axis which is equal to the value
  7850. 5:10:59of y at x equal to zero
  7851. 5:11:02b is the regression coefficient or the
  7852. 5:11:06slope of the line and c is the error in
  7853. 5:11:09the regression model which has a mean of
  7854. 5:11:12zero
  7855. 5:11:13the next screen will focus on the least
  7856. 5:11:15squares method in simple linear
  7857. 5:11:17regression
  7858. 5:11:20with reference to the error mentioned
  7859. 5:11:22earlier if correlation coefficient of y
  7860. 5:11:25and x is not equal to one
  7861. 5:11:27meaning the relation is not perfectly
  7862. 5:11:30linear there could be several lines that
  7863. 5:11:32could fit in the scatter plot
  7864. 5:11:35notice the two graphs displayed
  7865. 5:11:37for the same set of five points two
  7866. 5:11:40different types of lines are drawn and
  7867. 5:11:42both of them have errors
  7868. 5:11:44error refers to the points on the
  7869. 5:11:46scatter plot that do not fall on the
  7870. 5:11:49straight line drawn the second graph
  7871. 5:11:51shows the y-intercept
  7872. 5:11:53statistical software like minitab fits
  7873. 5:11:56the line which has the least value of
  7874. 5:11:58error squared and added
  7875. 5:12:01as is clear from the graph error is the
  7876. 5:12:03distance of the point from the fitted
  7877. 5:12:05line
  7878. 5:12:06typically the data lies off the line
  7879. 5:12:10in perfect linear relation
  7880. 5:12:12all points would lie on the line and
  7881. 5:12:14error would be zero
  7882. 5:12:16the distance from the point to the line
  7883. 5:12:18is the error distance used in the sse
  7884. 5:12:21calculations
  7885. 5:12:23let's understand slr with the help of an
  7886. 5:12:25example in the next screen
  7887. 5:12:28consider the following example
  7888. 5:12:31suppose a farmer wishes to predict the
  7889. 5:12:33relationship between the amount spent on
  7890. 5:12:36fertilizers and the annual sales of his
  7891. 5:12:39crops
  7892. 5:12:40he collects the data shown here for the
  7893. 5:12:42last few years and determines his
  7894. 5:12:45expected revenue if he spends eight
  7895. 5:12:47dollars annually on fertilizers
  7896. 5:12:50he has targeted sales of thirty one
  7897. 5:12:52dollars this year
  7898. 5:12:54the steps to perform
  7899. 5:12:56simple linear regression in ms excel are
  7900. 5:12:59as follows
  7901. 5:13:01copy the data table on an excel
  7902. 5:13:03worksheet
  7903. 5:13:04select all the data from b1 to c6
  7904. 5:13:08this is assuming the years table appears
  7905. 5:13:11in cells a1 to a6
  7906. 5:13:14click insert and choose the plain
  7907. 5:13:16scatter chart
  7908. 5:13:18it is titled scatter with only markers
  7909. 5:13:21the basic scatter chart will appear as
  7910. 5:13:24shown on the screen
  7911. 5:13:26right click on the data points in the
  7912. 5:13:27scatter chart and choose the option add
  7913. 5:13:30trendline
  7914. 5:13:32then choose the option linear and select
  7915. 5:13:35the boxes titled display r squared value
  7916. 5:13:38and display equation
  7917. 5:13:41a linear line will appear which is
  7918. 5:13:43called the best fit line
  7919. 5:13:45or the least squares line
  7920. 5:13:48to use the data for regression analysis
  7921. 5:13:51the interpretation of the scatter chart
  7922. 5:13:53is as follows
  7923. 5:13:55the r-square value or the coefficient of
  7924. 5:13:58determination conveys if the model is
  7925. 5:14:00good and can be used
  7926. 5:14:02the r-square value here is 0.3797
  7927. 5:14:08it means 38 percent of variability in y
  7928. 5:14:12is explained by x
  7929. 5:14:14the remaining 62 variation is
  7930. 5:14:17unexplained or due to residual factors
  7931. 5:14:21other factors like rain amount and
  7932. 5:14:23variability sunshine temperatures seed
  7933. 5:14:27type and seed quality could be tested
  7934. 5:14:30the low value of r square statistically
  7935. 5:14:33validates poor relationship between y
  7936. 5:14:36and x
  7937. 5:14:37thus the equation presented cannot be
  7938. 5:14:39used for further analysis
  7939. 5:14:42in a similar situation one should refer
  7940. 5:14:45to the cause and effect matrix and study
  7941. 5:14:47the relationship between y and a
  7942. 5:14:50different x variable
  7943. 5:14:53we will discuss multiple linear
  7944. 5:14:55regression in this screen
  7945. 5:14:57if a new variable x2 is added to the r
  7946. 5:15:01square model the impact of x1 and x2 on
  7947. 5:15:05y gets tested
  7948. 5:15:07this is known as multiple linear
  7949. 5:15:09regression
  7950. 5:15:10the value of r square changes due to the
  7951. 5:15:13introduction of the new variable
  7952. 5:15:16the resulting value of r square which
  7953. 5:15:19can be used in cases of multiple
  7954. 5:15:21regression is known as r square adjusted
  7955. 5:15:25the model can be used if r square
  7956. 5:15:27adjusted value is greater than seventy
  7957. 5:15:30percent
  7958. 5:15:31we will look at the key concepts in the
  7959. 5:15:33next screen
  7960. 5:15:36the key concepts in multiple linear
  7961. 5:15:38regression are as follows
  7962. 5:15:41the residuals or the differences between
  7963. 5:15:43the actual value and the predicted value
  7964. 5:15:46give an indication of how good the model
  7965. 5:15:49is
  7966. 5:15:50if the errors or residuals are small and
  7967. 5:15:53predictions use x's that are within the
  7968. 5:15:55range of the collected data the
  7969. 5:15:58predictions should be fine
  7970. 5:16:00the sum of squares total can be
  7971. 5:16:02calculated as follows
  7972. 5:16:05sum of squares total or sst
  7973. 5:16:08equals the sum of squares of regression
  7974. 5:16:11or ssr plus sum of squares of error or
  7975. 5:16:15sse
  7976. 5:16:17to arrive at sum of squares of
  7977. 5:16:19regression ssr
  7978. 5:16:21use the formula ssr equals sum of
  7979. 5:16:25squares total
  7980. 5:16:26or sst minus sum of squares of error or
  7981. 5:16:30sse
  7982. 5:16:32since ssr is sse subtracted from sst
  7983. 5:16:37value of sse should be less than sst
  7984. 5:16:43r squared is sum of squares of
  7985. 5:16:45regression or ssr divided by sum of
  7986. 5:16:48squares total or sst
  7987. 5:16:52calculating sst and sse helps in
  7988. 5:16:56determining ssr and r square
  7989. 5:17:00to get a sense of the error in the
  7990. 5:17:02fitted model
  7991. 5:17:03calculate the value of y for a given
  7992. 5:17:06data using the fitted line equation
  7993. 5:17:09to check for error take two observations
  7994. 5:17:12of y at the same x
  7995. 5:17:14the most important thing to remember in
  7996. 5:17:17regression analysis
  7997. 5:17:18is that the obtained fitted line
  7998. 5:17:21equation cannot be used to predict y for
  7999. 5:17:24values of x outside the data
  8000. 5:17:27for example it would not be possible to
  8001. 5:17:29predict the amount spent on fertilizers
  8002. 5:17:32for a forecasted sales of 15 or sixty
  8003. 5:17:36dollars
  8004. 5:17:37both data points lie outside the data
  8005. 5:17:39set on which regression analysis is
  8006. 5:17:42performed
  8007. 5:17:43if y is dependent on many x's then
  8008. 5:17:47simple linear regression analysis can be
  8009. 5:17:50used to prioritize x
  8010. 5:17:52but it requires running separate
  8011. 5:17:54regressions on y with each x
  8012. 5:17:58if an x does not explain variation in y
  8013. 5:18:01then it should not be explored any
  8014. 5:18:03further
  8015. 5:18:04these were the interpretations of the
  8016. 5:18:06simple linear regression equation
  8017. 5:18:09in the next screen we will learn that
  8018. 5:18:11despite a relationship being established
  8019. 5:18:14between two variables the change in one
  8020. 5:18:17may not cause a change in the other
  8021. 5:18:20let us discuss the difference between
  8022. 5:18:22correlation and causation in the
  8023. 5:18:24following screen
  8024. 5:18:26a regression equation denotes only a
  8025. 5:18:28relationship between the y and the x
  8026. 5:18:32this does not mean that a change in one
  8027. 5:18:34variable will cause a change in the
  8028. 5:18:36other
  8029. 5:18:37if number of schools and incidents of
  8030. 5:18:39crime in a city rise together there may
  8031. 5:18:42be a relationship but no causation
  8032. 5:18:45the increase in both the factors could
  8033. 5:18:47be due to a third factor that is
  8034. 5:18:50population
  8035. 5:18:51in other words both of them may be
  8036. 5:18:53dependent variables to an independent
  8037. 5:18:56variable
  8038. 5:18:57consider the graphs shown on the screen
  8039. 5:19:00the graphs on the left show the
  8040. 5:19:02relations between number of sneezes and
  8041. 5:19:05incidence of death with respect to
  8042. 5:19:07population
  8043. 5:19:09both have a positive correlation
  8044. 5:19:11finding a positive correlation between
  8045. 5:19:14incidents of deaths and number of
  8046. 5:19:16sneezes does not mean we assume sneezing
  8047. 5:19:19is the cause of somebody's death
  8048. 5:19:21despite the correlation being very
  8049. 5:19:23strong as depicted in the graph on the
  8050. 5:19:26right
  8051. 5:19:27let us proceed to the next topic of this
  8052. 5:19:29lesson in the following screen
  8053. 5:19:32in this topic we will discuss hypothesis
  8054. 5:19:35testing in detail
  8055. 5:19:37let us learn about statistical and
  8056. 5:19:40practical significance of hypothesis
  8057. 5:19:42test in the following screen
  8058. 5:19:45the differences between a variable and
  8059. 5:19:48its hypothesized value may be
  8060. 5:19:50statistically significant
  8061. 5:19:52but may not be practical or economically
  8062. 5:19:55meaningful
  8063. 5:19:57for example based on a hypothesis test
  8064. 5:20:00nutra worldwide inc wants to implement a
  8065. 5:20:03trading strategy which is proven to
  8066. 5:20:05provide statistically significant
  8067. 5:20:07returns
  8068. 5:20:09however it does not guarantee trading on
  8069. 5:20:11this strategy would result in
  8070. 5:20:13economically meaningful positive returns
  8071. 5:20:17when the logical reasons are examined
  8072. 5:20:19before implementation the returns are
  8073. 5:20:22economically significant
  8074. 5:20:24the returns may not be significant when
  8075. 5:20:26statistically proven strategy is
  8076. 5:20:29implemented directly
  8077. 5:20:31the returns may not be economically
  8078. 5:20:33significant after accounting for taxes
  8079. 5:20:36transaction costs and risks inherent in
  8080. 5:20:39the strategy
  8081. 5:20:40thus there should be a practical or
  8082. 5:20:42economic significant study before
  8083. 5:20:45implementing any statistically
  8084. 5:20:46significant data
  8085. 5:20:48the next screen will briefly focus on
  8086. 5:20:50the conceptual differences between a
  8087. 5:20:53null and an alternate hypothesis
  8088. 5:20:57the conceptual differences between a
  8089. 5:20:59null and an alternate hypothesis are as
  8090. 5:21:02follows
  8091. 5:21:04assume the specification of the current
  8092. 5:21:06process is itself the null hypothesis
  8093. 5:21:10null hypothesis denoted as the basic
  8094. 5:21:13assumption for any activity or
  8095. 5:21:15experiment
  8096. 5:21:16is represented as h o
  8097. 5:21:19no hypothesis cannot be proved it can
  8098. 5:21:22only be rejected or disproved
  8099. 5:21:25it is important to note that if null
  8100. 5:21:27hypothesis is rejected
  8101. 5:21:30alternative hypothesis must be right
  8102. 5:21:33for example assuming that a movie is
  8103. 5:21:35good one plans to watch it
  8104. 5:21:37therefore the null hypothesis in this
  8105. 5:21:40scenario will be
  8106. 5:21:41movie is good
  8107. 5:21:44alternative hypothesis or h a
  8108. 5:21:46challenges the null hypothesis
  8109. 5:21:49or is the converse of the null
  8110. 5:21:51hypothesis
  8111. 5:21:53in this scenario alternate hypothesis
  8112. 5:21:55will be movie is not good
  8113. 5:21:58in the following screen we will discuss
  8114. 5:22:00type 1 and type 2 error
  8115. 5:22:04rejecting a null hypothesis when it is
  8116. 5:22:07true is called type 1 error
  8117. 5:22:09it is also known as producer's risk
  8118. 5:22:12for example the rejection of a product
  8119. 5:22:15by the qa team when it is not defective
  8120. 5:22:18will cause loss to the producer suppose
  8121. 5:22:21when a movie is good it is reviewed to
  8122. 5:22:24be not good this reflects type 1 error
  8123. 5:22:28in this case the null hypothesis
  8124. 5:22:30is rejected when it is actually true
  8125. 5:22:33the two important points to be noted are
  8126. 5:22:36significance level or alpha is the
  8127. 5:22:39chance of committing a type 1 error
  8128. 5:22:42the value of alpha is
  8129. 5:22:440.05 or 5 percent
  8130. 5:22:48accepting a null hypothesis when it is
  8131. 5:22:50false is called type 2 error
  8132. 5:22:54it is also known as consumer's risk
  8133. 5:22:57for example the acceptance of a
  8134. 5:22:59defective product by the quality analyst
  8135. 5:23:01of an organization will cause loss to
  8136. 5:23:04the consumer who buys it
  8137. 5:23:07minimizing type 2 error requires
  8138. 5:23:09acceptance criteria to be very strict
  8139. 5:23:12suppose when a movie is not good it is
  8140. 5:23:15reviewed to be good this reflects type
  8141. 5:23:18two error
  8142. 5:23:19in this case the alternate hypothesis is
  8143. 5:23:22rejected when it was actually true the
  8144. 5:23:26two important points to be noted are
  8145. 5:23:28beta is the chance of committing a type
  8146. 5:23:302 error
  8147. 5:23:32the value of beta is 0.2 or 20 percent
  8148. 5:23:36any experiment should have as less beta
  8149. 5:23:38value as possible
  8150. 5:23:40the next screen will cover the key
  8151. 5:23:42points to remember about type 1 and type
  8152. 5:23:452 error
  8153. 5:23:48as you start dealing with the two types
  8154. 5:23:50of errors keep the following points in
  8155. 5:23:52mind the probability of making one type
  8156. 5:23:56of error can be reduced when one is
  8157. 5:23:58willing to accept a higher probability
  8158. 5:24:01of making the other type of error
  8159. 5:24:04suppose the management of a company
  8160. 5:24:05producing pacemakers wants to ensure no
  8161. 5:24:09defective pacemaker reaches the consumer
  8162. 5:24:12so the quality assurance team makes
  8163. 5:24:15stringent guidelines to inspect the
  8164. 5:24:17pacemakers
  8165. 5:24:18this would invariably decrease the beta
  8166. 5:24:21error or type 2 error
  8167. 5:24:23but this will also increase the chance
  8168. 5:24:26that a non-defective pacemaker is
  8169. 5:24:28declared defective by the quality
  8170. 5:24:31assurance team
  8171. 5:24:32thus alpha error or type 1 error
  8172. 5:24:35increases
  8173. 5:24:37if all null hypotheses are accepted to
  8174. 5:24:40avoid rejecting true null hypothesis
  8175. 5:24:43it will lead to type 2 error
  8176. 5:24:45typically alpha is set at 0.05
  8177. 5:24:49which means that the risk of committing
  8178. 5:24:51a type 1 error is 1 out of 20
  8179. 5:24:54experiments
  8180. 5:24:55in case of any product the teams must
  8181. 5:24:58decide what type of error should be less
  8182. 5:25:01and set the value of alpha and beta
  8183. 5:25:04accordingly
  8184. 5:25:05in the next screen we will discuss the
  8185. 5:25:07power of test
  8186. 5:25:10the power of a hypothesis test or the
  8187. 5:25:13power of test is the probability of
  8188. 5:25:16correctly rejecting the null hypothesis
  8189. 5:25:18when it is false
  8190. 5:25:20power of a test is represented by 1
  8191. 5:25:23minus beta which is also the type 2
  8192. 5:25:26error
  8193. 5:25:27the probability of not committing a type
  8194. 5:25:292 error is called the power of a
  8195. 5:25:31hypothesis test
  8196. 5:25:33the power of a test helps in improving
  8197. 5:25:36the advantage of hypothesis testing
  8198. 5:25:39the higher the power of a test the
  8199. 5:25:42better it is for purposes of hypothesis
  8200. 5:25:44testing given a choice of tests the one
  8201. 5:25:48with the highest power should be
  8202. 5:25:50preferred
  8203. 5:25:51the only way to decrease the probability
  8204. 5:25:54of a type 2 error given the significance
  8205. 5:25:57level or probability of type 1 error
  8206. 5:26:00is to increase the sample size
  8207. 5:26:03it is important to note that quality
  8208. 5:26:05inspection is done on sample pieces and
  8209. 5:26:08not on all the products
  8210. 5:26:10so beta error is a function of the
  8211. 5:26:13sample size
  8212. 5:26:14if the sample size is not appropriate
  8213. 5:26:17the defects in a product line could
  8214. 5:26:19easily be missed out giving a wrong
  8215. 5:26:22perception of the quality of the product
  8216. 5:26:25this will increase the type ii error
  8217. 5:26:28to decrease this error the quality
  8218. 5:26:30assurance team has to increase the
  8219. 5:26:32sample size
  8220. 5:26:34in hypothesis testing
  8221. 5:26:36alpha is called the significance level
  8222. 5:26:39and one minus alpha is called the
  8223. 5:26:41confidence level of the test
  8224. 5:26:43in the next screen we will focus on the
  8225. 5:26:46determinants of sample size for
  8226. 5:26:48continuous data
  8227. 5:26:50the sample size can be calculated by
  8228. 5:26:53answering three simple questions how
  8229. 5:26:56much variation is present in the
  8230. 5:26:58population
  8231. 5:26:59at what interval does the true
  8232. 5:27:01population mean need to be estimated
  8233. 5:27:04and how much representation error is
  8234. 5:27:06allowed in the sample
  8235. 5:27:08continuous data is data which can be
  8236. 5:27:10measured
  8237. 5:27:12the sample size for continuous data can
  8238. 5:27:14be determined by the formula shown on
  8239. 5:27:16the screen
  8240. 5:27:18we will learn about the standard sample
  8241. 5:27:20size formula for continuous data in the
  8242. 5:27:22next screen
  8243. 5:27:25representation error or alpha error is
  8244. 5:27:28generally assumed to be 5
  8245. 5:27:30or 0.05
  8246. 5:27:33hence the expression of 1 minus alpha
  8247. 5:27:36divided by 2 amounts to
  8248. 5:27:380.975 or 97.5 percent
  8249. 5:27:43looking up the value of z 97.5 from the
  8250. 5:27:46z table gives the value 1.96
  8251. 5:27:51the expression reduces to the one shown
  8252. 5:27:53on screen
  8253. 5:27:55when alpha is 5
  8254. 5:27:57z is 1.96
  8255. 5:27:59to detect a change that is half the
  8256. 5:28:02standard deviation
  8257. 5:28:03one needs to get at least 16 data points
  8258. 5:28:06for the sample
  8259. 5:28:08click the example tab to view an example
  8260. 5:28:10of continuous data calculation using
  8261. 5:28:13standard sample size formula
  8262. 5:28:17the population standard deviation for
  8263. 5:28:19the time to resolve customer problems is
  8264. 5:28:2230 hours
  8265. 5:28:23what should be the size of a sample that
  8266. 5:28:26can estimate the average problem
  8267. 5:28:28resolution time within plus or minus 5
  8268. 5:28:31hours tolerance with 99 percent
  8269. 5:28:33confidence
  8270. 5:28:35to know with 99 confidence that the time
  8271. 5:28:38to resolve a customer problem ranges
  8272. 5:28:40between 25 and 35 hours
  8273. 5:28:43the value of z for 99.5 must be two
  8274. 5:28:47point five seven five
  8275. 5:28:49a good result should fall outside the
  8276. 5:28:51range of zero point five percent which
  8277. 5:28:54is one in two hundred trials
  8278. 5:28:56it is expected that one hundred ninety
  8279. 5:28:58nine out of two hundred trials will
  8280. 5:29:00confirm a proper conclusion
  8281. 5:29:03the calculation gives a result of 238.70
  8282. 5:29:08one cannot have point seven zero of a
  8283. 5:29:10sample so one needs to round up to the
  8284. 5:29:13nearest integer
  8285. 5:29:15if there are 239 samples
  8286. 5:29:18the significance level is greater than
  8287. 5:29:200.01
  8288. 5:29:22which indicates the confidence is less
  8289. 5:29:24than 99
  8290. 5:29:26using 239 reduces alpha and increases
  8291. 5:29:30the confidence level
  8292. 5:29:32the rounded up value 239 means the
  8293. 5:29:35expectations are being met for the
  8294. 5:29:37confidence level of the test
  8295. 5:29:41we will learn about the standard sample
  8296. 5:29:43size formula for discrete data in this
  8297. 5:29:46screen
  8298. 5:29:47like continuous data one can find out
  8299. 5:29:49the sample size required while dealing
  8300. 5:29:51with discrete population
  8301. 5:29:53if the average population proportion
  8302. 5:29:56non-defective is p then population
  8303. 5:29:59standard deviation can be calculated by
  8304. 5:30:01using the expression shown on the screen
  8305. 5:30:04the expression for sample size is
  8306. 5:30:06present
  8307. 5:30:08it is important to note that in this
  8308. 5:30:09expression the interval or tolerance is
  8309. 5:30:12in percentage
  8310. 5:30:14click the example tab to view an example
  8311. 5:30:16of discrete data calculation using
  8312. 5:30:19standard sample size formula
  8313. 5:30:23the non-defective population proportion
  8314. 5:30:25for pen manufacturing is eighty percent
  8315. 5:30:28what should be the sample size to draw a
  8316. 5:30:31sample that can estimate the proportion
  8317. 5:30:33of compliant pans within plus or minus
  8318. 5:30:36five percent with an alpha of five
  8319. 5:30:38percent consider calculating the sample
  8320. 5:30:41size for discrete data for which the
  8321. 5:30:43population proportion non-defective is
  8322. 5:30:46eighty percent and the tolerance limit
  8323. 5:30:48is within plus or minus five percent
  8324. 5:30:51substituting the values it is found the
  8325. 5:30:54sample size should be 246. in this
  8326. 5:30:57example to know if the population
  8327. 5:30:59proportion for good pens is still within
  8328. 5:31:0175 to 85 percent
  8329. 5:31:04and to have 95 percent confidence that
  8330. 5:31:07the sample will allow a good conclusion
  8331. 5:31:10one needs to inspect
  8332. 5:31:12245.86 pounds
  8333. 5:31:140.86 of a pen cannot be inspected so the
  8334. 5:31:18value is rounded up to maintain the
  8335. 5:31:20confidence level
  8336. 5:31:22inspecting 245 or fewer pens reduces the
  8337. 5:31:26confidence level
  8338. 5:31:28this means the z value would be lower
  8339. 5:31:30than 1.96
  8340. 5:31:32and alpha would be greater than 0.05
  8341. 5:31:36suppose one is willing to accept a
  8342. 5:31:38greater range in the estimate
  8343. 5:31:40the proportion is within 20 percent of
  8344. 5:31:42the past results and approximately
  8345. 5:31:45within one standard deviation of the
  8346. 5:31:47proportion
  8347. 5:31:48delta changes to 0.20 and the number of
  8348. 5:31:52needed samples is 15.4 is approximately
  8349. 5:31:56equal to 16.
  8350. 5:32:00this screen will focus on the hypothesis
  8351. 5:32:02testing roadmap
  8352. 5:32:04though the basic determinants of
  8353. 5:32:06accepting or rejecting a hypothesis
  8354. 5:32:08remain the same
  8355. 5:32:09various tests are used depending on the
  8356. 5:32:12type of data from the figure shown on
  8357. 5:32:14the screen you can conclude the type of
  8358. 5:32:16test to be performed based on the kind
  8359. 5:32:18of data and values available
  8360. 5:32:21for discrete data if mean and standard
  8361. 5:32:23deviation are both known the z-test is
  8362. 5:32:26used
  8363. 5:32:27and if mean is known but standard
  8364. 5:32:29deviation is unknown the t-test is used
  8365. 5:32:33if the standard deviation is unknown and
  8366. 5:32:36if the sample size is less than 30
  8367. 5:32:39it is preferable to use the t-test if
  8368. 5:32:42variance is known one should go for
  8369. 5:32:44chi-squared test
  8370. 5:32:46if mean and standard deviation are known
  8371. 5:32:48for a set of continuous data it is
  8372. 5:32:51recommended to go for the z-test
  8373. 5:32:54for mean comparison of two with standard
  8374. 5:32:56deviation unknown
  8375. 5:32:57go for t-test and for mean comparison of
  8376. 5:33:00many with standard deviation unknown go
  8377. 5:33:03for f-test
  8378. 5:33:05also if the variance is known for
  8379. 5:33:07continuous data go for f-test the next
  8380. 5:33:10few screens will discuss in detail the
  8381. 5:33:12tests for mean variance and proportions
  8382. 5:33:15let us understand hypothesis test for
  8383. 5:33:18means theoretical through an example in
  8384. 5:33:20the next screen
  8385. 5:33:22the examples of hypothesis testing based
  8386. 5:33:25on the types of data and values
  8387. 5:33:26available are discussed here
  8388. 5:33:29the value of alpha can be assumed to be
  8389. 5:33:315
  8390. 5:33:32or
  8391. 5:33:330.05
  8392. 5:33:35suppose you want to check for the
  8393. 5:33:36average height of a population
  8394. 5:33:39north american males are selected as the
  8395. 5:33:41population here
  8396. 5:33:43from the population 117 men are gathered
  8397. 5:33:46as the sample and the readings of their
  8398. 5:33:48height are taken
  8399. 5:33:50the null hypothesis is that the average
  8400. 5:33:53height of north american males is 165
  8401. 5:33:56centimeters
  8402. 5:33:57and the alternate hypothesis is that the
  8403. 5:34:00height is lesser or greater than 165
  8404. 5:34:04centimeters
  8405. 5:34:05consider the sample size n as 117 for z
  8406. 5:34:09test and sample size n is 25 for t test
  8407. 5:34:14sample average or x bar is
  8408. 5:34:16164.5 centimeters
  8409. 5:34:19using the data given let us calculate
  8410. 5:34:22the z calc value and t calc value
  8411. 5:34:25the population height is 165 centimeters
  8412. 5:34:29with a standard deviation of 5.2
  8413. 5:34:31centimeters and the average height of
  8414. 5:34:33the sample group is
  8415. 5:34:35164.5 centimeters the test for
  8416. 5:34:38significant difference should be
  8417. 5:34:40conducted
  8418. 5:34:42first let us compute z calc value using
  8419. 5:34:45the formula given on the screen
  8420. 5:34:47hence the z calc is 1.04
  8421. 5:34:51which is less than 1.96 or t critical
  8422. 5:34:55therefore the null hypothesis cannot be
  8423. 5:34:58rejected
  8424. 5:34:59since z
  8425. 5:35:000.05 equals 1.96
  8426. 5:35:03the null hypothesis is not rejected at
  8427. 5:35:06five percent level of significance
  8428. 5:35:09the statistical notation is shown on the
  8429. 5:35:11screen
  8430. 5:35:12thus a conclusion based on the sample
  8431. 5:35:14collected is that the average height of
  8432. 5:35:16north american males is 165 centimeters
  8433. 5:35:20if the population standard deviation is
  8434. 5:35:23not known a t-test is used
  8435. 5:35:26it is similar to the z-test
  8436. 5:35:28instead of using the population
  8437. 5:35:30parameter or sigma the sample statistic
  8438. 5:35:33standard deviation or s is used
  8439. 5:35:36in this example the s value is 5.0
  8440. 5:35:40let us now compute t value using the
  8441. 5:35:42formula given on the screen
  8442. 5:35:45the statistical notation to reject null
  8443. 5:35:47hypothesis is shown on the screen
  8444. 5:35:50the t critical value is 2.064
  8445. 5:35:53and we know the t calc value is 0.5
  8446. 5:35:57which is less than 2.064
  8447. 5:36:00therefore the null hypothesis cannot be
  8448. 5:36:02rejected at five percent level of
  8449. 5:36:04significance
  8450. 5:36:06thus a conclusion based on the sample
  8451. 5:36:08collected is that the average height of
  8452. 5:36:10north american males is 165 centimeters
  8453. 5:36:14the conclusion of not rejecting the null
  8454. 5:36:17hypothesis
  8455. 5:36:18is based on the assumption that the 25
  8456. 5:36:21males are randomly selected from all
  8457. 5:36:23males in north america
  8458. 5:36:25null and alternative hypotheses are same
  8459. 5:36:29for both z-test and t-test
  8460. 5:36:32in both the examples the null hypothesis
  8461. 5:36:34is not rejected
  8462. 5:36:36in the next screen we will understand
  8463. 5:36:38the hypothesis test for variance with an
  8464. 5:36:41example
  8465. 5:36:43in hypothesis test for variance
  8466. 5:36:45chi-square test is used
  8467. 5:36:48in the case of a chi-square test the
  8468. 5:36:50null and alternate hypotheses are
  8469. 5:36:52defined and the values of chi-square
  8470. 5:36:55critical and chi-square are calculated
  8471. 5:36:59to understand this concept with an
  8472. 5:37:01example click the button given on the
  8473. 5:37:03screen
  8474. 5:37:05the null hypothesis is that the
  8475. 5:37:07proportion of wins in australia or
  8476. 5:37:10abroad is independent of the country
  8477. 5:37:12played against
  8478. 5:37:14the alternate hypothesis is that the
  8479. 5:37:16proportion of wins in australia or
  8480. 5:37:18abroad is dependent on the country
  8481. 5:37:21played against
  8482. 5:37:22chi-square critical is 6.251
  8483. 5:37:26and chi-square calculated is 1.36
  8484. 5:37:30since the calculated value is less than
  8485. 5:37:32the critical value the proportion of
  8486. 5:37:34wins of the australia hockey team is
  8487. 5:37:37independent of the country played or
  8488. 5:37:40place
  8489. 5:37:42in this screen we will discuss
  8490. 5:37:44hypothesis test for proportions with an
  8491. 5:37:46example
  8492. 5:37:47the hypothesis test on population
  8493. 5:37:50proportion can be performed
  8494. 5:37:52to understand this with an example click
  8495. 5:37:55the button given on the screen
  8496. 5:37:59let us perform hypothesis test on
  8497. 5:38:01population proportion
  8498. 5:38:03the null hypothesis is that the
  8499. 5:38:05proportion of smokers among males in a
  8500. 5:38:07place named r is 0.10
  8501. 5:38:11represented as p 0.
  8502. 5:38:14the alternative hypothesis is the
  8503. 5:38:16proportion is different than 0.10
  8504. 5:38:19in notation it is represented as null
  8505. 5:38:22hypothesis is p equals p zero against
  8506. 5:38:26alternative hypothesis is p different
  8507. 5:38:29than p zero
  8508. 5:38:31a sample of 150 adult males are
  8509. 5:38:34interviewed and it is found that 23 of
  8510. 5:38:37them are smokers
  8511. 5:38:38thus the sample proportion is 23 divided
  8512. 5:38:42by 150 which is 0.153
  8513. 5:38:46substituting this value in the
  8514. 5:38:48expression of z given on the screen
  8515. 5:38:51gives the result of 1.80
  8516. 5:38:54you can reject the null hypothesis at
  8517. 5:38:56level of significance alpha if z is
  8518. 5:38:59greater than z alpha for five percent
  8519. 5:39:02level of confidence the z value should
  8520. 5:39:05be 1.96
  8521. 5:39:07since the calculated z value is more
  8522. 5:39:09than what is required for five percent
  8523. 5:39:11level of confidence the null hypothesis
  8524. 5:39:14is rejected
  8525. 5:39:16hence it can be concluded that the
  8526. 5:39:18proportion of smokers in r is greater
  8527. 5:39:21than 0.10
  8528. 5:39:24in this screen we will focus on
  8529. 5:39:26comparison of means of two processes
  8530. 5:39:29means of two processes are compared to
  8531. 5:39:32understand whether the outcomes of the
  8532. 5:39:34two processes are significantly
  8533. 5:39:36different
  8534. 5:39:37this test is helpful in understanding
  8535. 5:39:39whether a new process is better than an
  8536. 5:39:41old process
  8537. 5:39:43this test can also determine whether the
  8538. 5:39:45two samples belong to the same
  8539. 5:39:47population or different populations
  8540. 5:39:50it is especially required for
  8541. 5:39:52benchmarking to compare an existing
  8542. 5:39:54process with another benchmarked process
  8543. 5:39:58let us proceed to the next screen to
  8544. 5:40:00learn about the paired comparison
  8545. 5:40:01hypothesis test for means
  8546. 5:40:04the example of two mean t-tests with
  8547. 5:40:06unequal variances is discussed here
  8548. 5:40:10null and alternate hypotheses are
  8549. 5:40:12defined
  8550. 5:40:13the average heights of men in two
  8551. 5:40:15different sets of people are compared to
  8552. 5:40:17see if the means are significantly
  8553. 5:40:19different
  8554. 5:40:20for this test the sample sizes means and
  8555. 5:40:23variances are required to calculate the
  8556. 5:40:26value of t
  8557. 5:40:28two samples of sizes n one of one
  8558. 5:40:31hundred twenty five and n two of one
  8559. 5:40:33hundred ten are taken from the two
  8560. 5:40:36populations
  8561. 5:40:37the mean value of sample size one is one
  8562. 5:40:40hundred 167.3
  8563. 5:40:42and sample size 2 is 165.8
  8564. 5:40:47the standard deviation for sample sizes
  8565. 5:40:501 and 2 are 4.2 and 5.0 respectively
  8566. 5:40:55using the formula given on the screen
  8567. 5:40:58the t value is derived as 2.47
  8568. 5:41:02the null hypothesis is rejected if the
  8569. 5:41:05calculated value of t is more than the
  8570. 5:41:07required value of t in other words
  8571. 5:41:11reject null hypothesis at level of
  8572. 5:41:13significance a if computed t value is
  8573. 5:41:16greater than t of df a divided by two
  8574. 5:41:21with a t-test we're comparing two means
  8575. 5:41:24and the population parameter sigma is
  8576. 5:41:26unknown
  8577. 5:41:27therefore we're pulling the sample
  8578. 5:41:29standard deviations in order to
  8579. 5:41:31calculate t
  8580. 5:41:33the variances are weighted by the number
  8581. 5:41:35of data points in each sample group
  8582. 5:41:38since t 223 and
  8583. 5:41:410.025 equals 1.96
  8584. 5:41:44the null hypothesis is rejected at 5
  8585. 5:41:48level of significance
  8586. 5:41:50the test used here is known as the
  8587. 5:41:52paired t-test and is considered a very
  8588. 5:41:55powerful test in the next screen we will
  8589. 5:41:58look into the example of the paired
  8590. 5:42:00comparison hypothesis test for variance
  8591. 5:42:03of f-test
  8592. 5:42:05it is important to understand the
  8593. 5:42:07different types of tests through an
  8594. 5:42:09example
  8595. 5:42:10susan is trying to compare the standard
  8596. 5:42:12deviation of two companies
  8597. 5:42:15according to her the earnings of company
  8598. 5:42:17a are more volatile than those of
  8599. 5:42:20company b
  8600. 5:42:21she has been obtaining earnings data for
  8601. 5:42:23the past 31 years for company a
  8602. 5:42:26and for the past 41 years for company b
  8603. 5:42:30she finds that the sample standard
  8604. 5:42:32deviation of company a's earnings is
  8605. 5:42:34four dollars forty cents
  8606. 5:42:36and of company b's earnings is three
  8607. 5:42:39dollars ninety cents
  8608. 5:42:41determine whether the earnings of
  8609. 5:42:42company a have a greater standard
  8610. 5:42:45deviation than those of company b at
  8611. 5:42:47five percent level of significance click
  8612. 5:42:50the button given on the screen to know
  8613. 5:42:53the answer
  8614. 5:42:55susan has the data of the earnings of
  8615. 5:42:58the companies
  8616. 5:42:59distributions rarely have the same
  8617. 5:43:01spread or variance
  8618. 5:43:03when processes are improved one of the
  8619. 5:43:06strategies is to reduce the variation
  8620. 5:43:09it is important to be able to compare
  8621. 5:43:11variances with each other
  8622. 5:43:13a null hypothesis would indicate no
  8623. 5:43:16change has occurred
  8624. 5:43:17if it can be rejected and the variance
  8625. 5:43:20is lower one can claim success
  8626. 5:43:23the statistical notation for this
  8627. 5:43:25example is given on the screen
  8628. 5:43:28suppose one has to compare two sets of
  8629. 5:43:30company data
  8630. 5:43:32susan has looked at the earnings of two
  8631. 5:43:34companies
  8632. 5:43:35she has been studying the effects of
  8633. 5:43:37strategy management styles and
  8634. 5:43:39leadership profiles on the earnings of
  8635. 5:43:42these companies
  8636. 5:43:43there are significant differences in
  8637. 5:43:45these kpiv's
  8638. 5:43:47she wants to know if they have an effect
  8639. 5:43:49on the variance in the earnings
  8640. 5:43:51she has sample data over several decades
  8641. 5:43:54for each company by the given data it
  8642. 5:43:57can be concluded that earnings of
  8643. 5:43:59company a have a greater standard
  8644. 5:44:01deviation than those of company b
  8645. 5:44:04in calculating the f-test statistic
  8646. 5:44:07always put the greater variance in the
  8647. 5:44:09numerator
  8648. 5:44:11let us look at the f test example of
  8649. 5:44:13hypothesis test for equality of variance
  8650. 5:44:16in this screen
  8651. 5:44:18the degrees of freedom for company a and
  8652. 5:44:20company b are 30 and 40 respectively
  8653. 5:44:24the critical value from f table equals
  8654. 5:44:261.74
  8655. 5:44:28the null hypothesis is rejected if the f
  8656. 5:44:32test statistic is greater than 1.74
  8657. 5:44:36the calculated value of f test statistic
  8658. 5:44:38is 1.273
  8659. 5:44:41and therefore at the 5 significance
  8660. 5:44:44level the null hypothesis cannot be
  8661. 5:44:46rejected
  8662. 5:44:48the next screen will focus on hypothesis
  8663. 5:44:50tests f-test for independent groups
  8664. 5:44:55a restaurant which wants to explore the
  8665. 5:44:57recent overuse of avocados suspects
  8666. 5:45:00there is a difference between two chefs
  8667. 5:45:03and the number of avocados used to
  8668. 5:45:05prepare the salads
  8669. 5:45:06the data shown in the table is the
  8670. 5:45:08measure of avocados in ounces
  8671. 5:45:11the weight of avocado slices used in
  8672. 5:45:13salads prepared by two different chefs
  8673. 5:45:16is to determine if one chef is using
  8674. 5:45:18more avocados than the other
  8675. 5:45:21perhaps the restaurant's expenditures on
  8676. 5:45:23avocados is greater this month than the
  8677. 5:45:26average of the past 12 months
  8678. 5:45:28this is assuming there is no change in
  8679. 5:45:30avocado prices or the amount of avocados
  8680. 5:45:33being used
  8681. 5:45:35click the tab to learn to conduct an
  8682. 5:45:37f-test in ms excel
  8683. 5:45:41the f-test is conducted in ms excel
  8684. 5:45:44through the following steps
  8685. 5:45:46open ms excel
  8686. 5:45:48click data click data analysis
  8687. 5:45:52please follow the facilitator
  8688. 5:45:53instruction on how to install add-ins
  8689. 5:45:56select f-test to sample for variances
  8690. 5:46:00in variable one range select the data
  8691. 5:46:02set for group a and select data set for
  8692. 5:46:05group b in variable 2 range
  8693. 5:46:08click ok
  8694. 5:46:10the screen shot of the f test window is
  8695. 5:46:12also shown here
  8696. 5:46:14in this screen we will discuss the f
  8697. 5:46:17test assumptions
  8698. 5:46:18before interpreting the f test the
  8699. 5:46:21assumptions to be considered are
  8700. 5:46:23null hypothesis
  8701. 5:46:25there is no significant statistical
  8702. 5:46:27difference between the variances of the
  8703. 5:46:29two groups thus concluding any variation
  8704. 5:46:32could be because of chance
  8705. 5:46:34this is common cause of variation
  8706. 5:46:37alternate hypothesis
  8707. 5:46:39there is a significant statistical
  8708. 5:46:41difference between the variances of the
  8709. 5:46:44two groups
  8710. 5:46:45thus concluding that variations could be
  8711. 5:46:47because of assignable causes too
  8712. 5:46:50this is special cause of variation
  8713. 5:46:53the following screen will focus on
  8714. 5:46:55f-test interpretations
  8715. 5:47:00the interpretations for the conducted
  8716. 5:47:02f-test are
  8717. 5:47:04from the excel result sheet the p-value
  8718. 5:47:07is 0.03
  8719. 5:47:09if p-value is low or below 0.05 the null
  8720. 5:47:14must be rejected
  8721. 5:47:15thus no hypothesis with 97 confidence is
  8722. 5:47:20rejected
  8723. 5:47:21also the fact that variation could only
  8724. 5:47:23be due to common cause of variation is
  8725. 5:47:26rejected it is inferred from the test
  8726. 5:47:29that there could be assignable causes of
  8727. 5:47:32variation or special causes of variation
  8728. 5:47:36excel provides the descriptive
  8729. 5:47:38statistics for each variable
  8730. 5:47:40it also gives the degrees of freedom for
  8731. 5:47:42each
  8732. 5:47:43f is the calculated f statistic f
  8733. 5:47:46critical is a reference number found in
  8734. 5:47:48a statistics book table
  8735. 5:47:50p of f less than or equal to f is the
  8736. 5:47:54probability that f really is less than f
  8737. 5:47:57critical
  8738. 5:47:58or that the null hypothesis would be
  8739. 5:48:00falsely rejected
  8740. 5:48:02since the p-value is less than the alpha
  8741. 5:48:05the null hypothesis can be confidently
  8742. 5:48:08rejected
  8743. 5:48:09alongside conducting a hypothesis test
  8744. 5:48:12a meaningful conclusion from the test
  8745. 5:48:14has been drawn
  8746. 5:48:16the following screen will focus on
  8747. 5:48:18hypothesis test t-test for independent
  8748. 5:48:21groups
  8749. 5:48:23as discussed earlier the table shows the
  8750. 5:48:25measure of avocados in ounces and the
  8751. 5:48:27significant difference in their means
  8752. 5:48:30needs to be inspected
  8753. 5:48:32if a significant amount of difference is
  8754. 5:48:34found it can be concluded that there is
  8755. 5:48:36a possibility of special cause of
  8756. 5:48:38variation
  8757. 5:48:40the next screen will demonstrate how to
  8758. 5:48:42conduct the two-sample t-test
  8759. 5:48:46the two-sample independent t-test
  8760. 5:48:48inspects two groups of data for
  8761. 5:48:50significant difference in their means
  8762. 5:48:53the idea is to conclude if there is a
  8763. 5:48:55significant amount of difference
  8764. 5:48:58if there is a statistical evidence of
  8765. 5:49:00variation
  8766. 5:49:01one can conclude a possibility of
  8767. 5:49:03special cause of variation the steps for
  8768. 5:49:06conducting a two-sample t-test are
  8769. 5:49:10open ms excel click data and click data
  8770. 5:49:13analysis
  8771. 5:49:15select two-sample independent t-test
  8772. 5:49:18assuming unequal variances
  8773. 5:49:20in variable 1 range select the data set
  8774. 5:49:23for group a and select the data set for
  8775. 5:49:26group b in variable 2 range
  8776. 5:49:29keep the hypothesized mean difference as
  8777. 5:49:320.
  8778. 5:49:33click ok
  8779. 5:49:35in the following screen we will focus on
  8780. 5:49:37two sample independent t test
  8781. 5:49:39assumptions
  8782. 5:49:42the assumptions for a two sample
  8783. 5:49:44independent t test are
  8784. 5:49:46null hypothesis
  8785. 5:49:48there is no significant statistical
  8786. 5:49:50difference between the means of the two
  8787. 5:49:52groups thus concluding any variation
  8788. 5:49:54could be because of chance
  8789. 5:49:57this is common cause of variation
  8790. 5:50:00alternate hypothesis
  8791. 5:50:02there is a significant statistical
  8792. 5:50:04difference between the means of the two
  8793. 5:50:06groups
  8794. 5:50:07thus concluding that variations could be
  8795. 5:50:09because of assignable causes too
  8796. 5:50:12this is special cause of variation
  8797. 5:50:15the null hypothesis states the mean of
  8798. 5:50:17group a is equal to the mean of group b
  8799. 5:50:21the alternate hypothesis states that the
  8800. 5:50:23mean of group a is not equal to the mean
  8801. 5:50:26of group b
  8802. 5:50:28note that alternate hypothesis tests two
  8803. 5:50:30conditions
  8804. 5:50:32mean of a is less than mean of b
  8805. 5:50:35and mean of a is greater than mean of b
  8806. 5:50:38thus a two-tailed probability needs to
  8807. 5:50:40be used
  8808. 5:50:42before we interpret the t-test results
  8809. 5:50:45let us compare the two-tailed and
  8810. 5:50:47one-tailed probability in the next
  8811. 5:50:49screen
  8812. 5:50:50two-tailed probability and one-tailed
  8813. 5:50:53probability are used depending on the
  8814. 5:50:55direction of the alternate hypothesis
  8815. 5:50:58if the alternate hypothesis tests more
  8816. 5:51:00than one direction either less or more
  8817. 5:51:03use a two-tailed probability value from
  8818. 5:51:06the test
  8819. 5:51:07example
  8820. 5:51:08if mean of a is not equal to mean of b
  8821. 5:51:12then it is two-tailed probability
  8822. 5:51:15if the alternate hypothesis tests only
  8823. 5:51:17one direction
  8824. 5:51:19use a one-tailed probability value from
  8825. 5:51:21the test
  8826. 5:51:22example if mean of a is greater than
  8827. 5:51:26mean of b then it is one-tailed
  8828. 5:51:28probability
  8829. 5:51:30in the next screen let us look at the
  8830. 5:51:32two-sample independent t-test results
  8831. 5:51:35and interpretations
  8832. 5:51:37the results are shown in the table on
  8833. 5:51:39the screen
  8834. 5:51:41the inference is as the two-tailed
  8835. 5:51:43probability is being tested the p-value
  8836. 5:51:46of two-tailed probability testing is
  8837. 5:51:480.24
  8838. 5:51:49which is greater than 0.05
  8839. 5:51:52if p-value is greater than 0.05 the null
  8840. 5:51:56hypothesis is not rejected
  8841. 5:51:59this means one cannot reject the fact
  8842. 5:52:01that there is no significant statistical
  8843. 5:52:03difference between the two means similar
  8844. 5:52:06to the f-test excel provides the
  8845. 5:52:08descriptive statistics for each group or
  8846. 5:52:10variable
  8847. 5:52:11the t stat is shown
  8848. 5:52:13excel also shows one-tailed or
  8849. 5:52:15two-tailed data
  8850. 5:52:17for the one-tailed test the alpha is
  8851. 5:52:190.05
  8852. 5:52:21the error is expected to be in one
  8853. 5:52:23direction
  8854. 5:52:24for the two-tailed test the error is
  8855. 5:52:27alpha slash two or zero point zero two
  8856. 5:52:30five
  8857. 5:52:32in this example t stat or t calculated
  8858. 5:52:35is less than either t criticals
  8859. 5:52:37therefore the null hypothesis cannot be
  8860. 5:52:39rejected
  8861. 5:52:40thus it can be inferred that both the
  8862. 5:52:42groups are statistically same
  8863. 5:52:45we will discuss the paired t-test in the
  8864. 5:52:47next screen
  8865. 5:52:49paired t-test is another hypothesis test
  8866. 5:52:52from the family of t-tests
  8867. 5:52:55the following points will help in
  8868. 5:52:56understanding the paired t-test in
  8869. 5:52:58detail
  8870. 5:53:00the paired t-test is one of the most
  8871. 5:53:01powerful tests from the t-test family
  8872. 5:53:05the paired t-test is conducted before
  8873. 5:53:07and after the process to be measured for
  8874. 5:53:10example a group of students score x in
  8875. 5:53:13cssgb
  8876. 5:53:14before taking the training program
  8877. 5:53:17post the training program the scores are
  8878. 5:53:19taken again one needs to find out if
  8879. 5:53:21there is a statistical difference
  8880. 5:53:23between the two sets of scores
  8881. 5:53:26if there is a significant difference the
  8882. 5:53:28inference could be that the training was
  8883. 5:53:30effective it is important to note that
  8884. 5:53:33the paired t-test interpretation shows
  8885. 5:53:36the effectiveness of the improvement
  8886. 5:53:37measures
  8887. 5:53:39this is the main reason why paired
  8888. 5:53:41t-tests are often used in the improve
  8889. 5:53:43stage let us learn about sample variance
  8890. 5:53:46in the following screen
  8891. 5:53:48sample variance is defined as the
  8892. 5:53:50average of the squared differences from
  8893. 5:53:53the mean
  8894. 5:53:54the sample variance that is s square can
  8895. 5:53:57be used to calculate and understand the
  8896. 5:53:59degree of variation of a sample
  8897. 5:54:02it can also be used in statistics
  8898. 5:54:05however it cannot be used or explained
  8899. 5:54:07directly because its value does not
  8900. 5:54:10provide any information
  8901. 5:54:12to use the value you have to first
  8902. 5:54:14convert it into standard deviation and
  8903. 5:54:17then combine it with the mean
  8904. 5:54:19click the button to know the steps for
  8905. 5:54:21calculating the sample variance
  8906. 5:54:26step one calculate the mean or average
  8907. 5:54:29of the sample
  8908. 5:54:30step two subtract each of the values
  8909. 5:54:33from the mean
  8910. 5:54:35step three calculate the square value of
  8911. 5:54:38the results
  8912. 5:54:39step four take the average of the
  8913. 5:54:42squared differences
  8914. 5:54:45let us understand how to calculate the
  8915. 5:54:47sample variance with the help of an
  8916. 5:54:49example in this screen
  8917. 5:54:52consider the sample of weights
  8918. 5:54:54the mean value is one hundred forty
  8919. 5:54:57when you subtract the individual values
  8920. 5:54:59from the mean
  8921. 5:55:00take the square value of the results and
  8922. 5:55:03then take the average of the squared
  8923. 5:55:05differences
  8924. 5:55:06you will get 1936
  8925. 5:55:09as the sample variance
  8926. 5:55:12this number is not useful as it is
  8927. 5:55:14in order to get the standard deviation
  8928. 5:55:17take the square root of the sample
  8929. 5:55:19variance
  8930. 5:55:20square root of 1936 equals forty four
  8931. 5:55:24the standard deviation in combination
  8932. 5:55:26with the mean will tell you how much the
  8933. 5:55:29majority of the people weigh
  8934. 5:55:31in this example if your mean is one
  8935. 5:55:33hundred forty and your variance is forty
  8936. 5:55:36four
  8937. 5:55:37you can conclude that the majority of
  8938. 5:55:40people weigh between 96 pounds
  8939. 5:55:43mean minus 44
  8940. 5:55:45and 184 pounds
  8941. 5:55:47mean plus 44.
  8942. 5:55:50let us proceed to the next screen that
  8943. 5:55:52focuses on the analysis of variance or
  8944. 5:55:55anova which is the comparison of more
  8945. 5:55:58than two means
  8946. 5:56:00a t-test is used for one sample
  8947. 5:56:03two sample tests are used for comparing
  8948. 5:56:05two means
  8949. 5:56:07to compare the means of more than two
  8950. 5:56:08samples use the anova method
  8951. 5:56:12anova stands for analysis of variance
  8952. 5:56:15anova does not tell the better mean it
  8953. 5:56:18helps in understanding that all the
  8954. 5:56:19sample means are not equal
  8955. 5:56:21the shortlisted samples based on anova
  8956. 5:56:24output can further be tested
  8957. 5:56:26one important aspect of anova is it
  8958. 5:56:29generalizes the t test to include more
  8959. 5:56:31than two samples
  8960. 5:56:33performing multiple two-sample t-tests
  8961. 5:56:36would increase the chance of committing
  8962. 5:56:37a type one error
  8963. 5:56:39hence anovas is useful in comparing two
  8964. 5:56:42or more means
  8965. 5:56:43the next screen will help in
  8966. 5:56:45understanding this concept through an
  8967. 5:56:47exam
  8968. 5:56:48as an example consider the takeaway food
  8969. 5:56:50delivery time of three different outlets
  8970. 5:56:54is there any evidence that the averages
  8971. 5:56:56for the three outlets are not equal
  8972. 5:56:59in other words can the delivery time be
  8973. 5:57:01benchmarked on the outlet
  8974. 5:57:04the null hypothesis will assume that the
  8975. 5:57:06three means are equal
  8976. 5:57:08if the null hypothesis is rejected it
  8977. 5:57:11would mean that there are at least two
  8978. 5:57:13outlets that are different in their
  8979. 5:57:14average delivery time
  8980. 5:57:17in minitab one can perform anova in one
  8981. 5:57:20of the statistics packages
  8982. 5:57:22ensure that the data of the table is
  8983. 5:57:24stacked in two columns
  8984. 5:57:26in the main menu go to stat anova and
  8985. 5:57:29then one way
  8986. 5:57:31the left column of the table will have
  8987. 5:57:32the outlets and the right column will
  8988. 5:57:34have the time in minutes
  8989. 5:57:37this is similar to the table shown on
  8990. 5:57:39the screen
  8991. 5:57:40in the one-way analysis of variance
  8992. 5:57:42window
  8993. 5:57:43select the response as delivery time and
  8994. 5:57:46factor as outlet and click ok
  8995. 5:57:50the output of this process is shown here
  8996. 5:57:53notice the p value which is much higher
  8997. 5:57:56than 0.05
  8998. 5:58:00the steps to perform anova in excel are
  8999. 5:58:02as follows
  9000. 5:58:04after entering the data to a spreadsheet
  9001. 5:58:07select the anova single factor test from
  9002. 5:58:09the data analysis tool pack select the
  9003. 5:58:12array for analysis designate that the
  9004. 5:58:15data is in columns and select an output
  9005. 5:58:17range
  9006. 5:58:19excel shows the descriptive statistics
  9007. 5:58:21for each column in the top table
  9008. 5:58:24in the second table the anova analysis
  9009. 5:58:26shows whether the variation is greater
  9010. 5:58:28between the groups or within the groups
  9011. 5:58:32it shows the sum of squares or ss
  9012. 5:58:34degrees of freedom df
  9013. 5:58:37means of squares ms or sum of squares
  9014. 5:58:39divided by n minus 1 or variance
  9015. 5:58:42the f statistic
  9016. 5:58:44ms between divided by ms within
  9017. 5:58:47p-value and f-critical from a reference
  9018. 5:58:49table
  9019. 5:58:51the f and p are calculated for the
  9020. 5:58:52variation that occurs within each of the
  9021. 5:58:54groups and between the groups
  9022. 5:58:57if the conditions in the groups are
  9023. 5:58:59significant it would be expected to see
  9024. 5:59:02the between groups ss much higher and
  9025. 5:59:05the ms slightly higher let us now
  9026. 5:59:08interpret the minitab anova results
  9027. 5:59:11since the p-value is more than 0.05
  9028. 5:59:15the null hypothesis is accepted
  9029. 5:59:18this means there is no significant
  9030. 5:59:20difference between means of delivery
  9031. 5:59:22time for the three outlets
  9032. 5:59:25based on the confidence intervals it is
  9033. 5:59:27found that the intervals overlap
  9034. 5:59:29which means there is little that
  9035. 5:59:30separates the means of the three samples
  9036. 5:59:34in one-way anova where there was only
  9037. 5:59:36one factor to be benchmarked that is the
  9038. 5:59:39outlet of delivery
  9039. 5:59:40if there are two factors you may use the
  9040. 5:59:43two-way anova
  9041. 5:59:45in this screen we will learn in detail
  9042. 5:59:48about chi-square distribution
  9043. 5:59:50the chi-square distribution is one of
  9044. 5:59:53the most widely used probability
  9045. 5:59:55distributions in inferential statistics
  9046. 5:59:58it is also known as hypothesis testing
  9047. 6:00:01and the distribution is used in
  9048. 6:00:03hypothesis tests
  9049. 6:00:05when used in hypothesis test needs one
  9050. 6:00:08sample for the test to be conducted
  9051. 6:00:11the chi-squared distribution is also
  9052. 6:00:13known as chi squared
  9053. 6:00:15it has k1 degrees of freedom and is the
  9054. 6:00:18distribution of a sum of the squares of
  9055. 6:00:20k independent standard normal random
  9056. 6:00:22variables suppose in a field for nine
  9057. 6:00:25players player one comes in and can
  9058. 6:00:27choose amongst all nine positions
  9059. 6:00:29available
  9060. 6:00:30player two can choose only amongst eight
  9061. 6:00:33and so on
  9062. 6:00:34after all the eight players have chosen
  9063. 6:00:36their positions the last player gets to
  9064. 6:00:39choose the last position left
  9065. 6:00:42the eight players are free to choose in
  9066. 6:00:44a playing field of nine eight is the
  9067. 6:00:46degree of freedom for this example
  9068. 6:00:48conventionally degree of freedom is n1
  9069. 6:00:51where n is the sample size
  9070. 6:00:54for example if w x y and z are four
  9071. 6:00:57random variables with standard normal
  9072. 6:01:00distributions
  9073. 6:01:01the random variable f which is the sum
  9074. 6:01:03of w square x square y square and z
  9075. 6:01:07square has a chi-square distribution
  9076. 6:01:10the degrees of freedom of the
  9077. 6:01:11distribution or the df equals the number
  9078. 6:01:15of normally distributed variables used
  9079. 6:01:17in this case df equals four
  9080. 6:01:21the formula for chi-squared distribution
  9081. 6:01:23is shown on the screen
  9082. 6:01:25it is important to note that f of o
  9083. 6:01:28stands for an observed frequency and f
  9084. 6:01:31of e stands for an expected frequency
  9085. 6:01:34the next screen will explain chi-square
  9086. 6:01:36test through an example
  9087. 6:01:39suppose the australian hockey team
  9088. 6:01:41wishes to analyze its wins at home and
  9089. 6:01:44abroad against four different countries
  9090. 6:01:47the data has two classifications and the
  9091. 6:01:49table is also known as a two by four
  9092. 6:01:52contingency table with two rows and four
  9093. 6:01:55columns
  9094. 6:01:56the expected frequencies can be
  9095. 6:01:58calculated assuming there is a
  9096. 6:02:00relationship
  9097. 6:02:02thus expected frequency for each of the
  9098. 6:02:04observed frequency is equal to product
  9099. 6:02:07of row total and column total divided by
  9100. 6:02:10overall total
  9101. 6:02:11one has to find out how to calculate the
  9102. 6:02:14expected frequency
  9103. 6:02:16if the observed frequency is three wins
  9104. 6:02:18against south africa in australia then
  9105. 6:02:21it would convert to total winds at home
  9106. 6:02:23which is 21 divided by the total number
  9107. 6:02:26of wins or 31 and is the result
  9108. 6:02:29multiplied by five
  9109. 6:02:31the result is 3.39
  9110. 6:02:34similarly the expected population
  9111. 6:02:37parameters for all cases are found
  9112. 6:02:40in this step all the information of the
  9113. 6:02:42previous screen is combined and the
  9114. 6:02:44table is populated
  9115. 6:02:46the estimated population parameters are
  9116. 6:02:49calculated and added
  9117. 6:02:51the formula estimates the observed
  9118. 6:02:52frequency to calculate the final
  9119. 6:02:54chi-square index which in this case is
  9120. 6:02:571.36
  9121. 6:02:59it is important to note that there is a
  9122. 6:03:01different chi-squared distribution for
  9123. 6:03:04each of the different numbers of degrees
  9124. 6:03:05of freedom
  9125. 6:03:07for the chi-square distribution the
  9126. 6:03:09degrees of freedom are calculated as per
  9127. 6:03:11the number of rows and columns in the
  9128. 6:03:13contingency table
  9129. 6:03:15the equation for degrees of freedom
  9130. 6:03:17should be noticed
  9131. 6:03:18the number of degrees of freedom is
  9132. 6:03:20equal to three
  9133. 6:03:22assuming an alpha of ten percent the
  9134. 6:03:24chi-squared distribution in the
  9135. 6:03:26chi-square table is noticed and a
  9136. 6:03:29critical chi-square index of 6.251 is
  9137. 6:03:32arrived at chi-square calculated value
  9138. 6:03:35is 1.36
  9139. 6:03:38both the values of the chi-square index
  9140. 6:03:40should be plotted
  9141. 6:03:42the critical chi-square distribution
  9142. 6:03:44divides the whole region into acceptance
  9143. 6:03:47and rejection
  9144. 6:03:48while the calculated chi-square
  9145. 6:03:50distribution is based on data and
  9146. 6:03:52conveys whether the data falls into an
  9147. 6:03:55acceptance or rejection region
  9148. 6:03:58therefore as the calculated value is
  9149. 6:04:00less than the critical value
  9150. 6:04:02and falls in the acceptance region
  9151. 6:04:05the proportion of wins of the aussie
  9152. 6:04:06team at home or abroad has nothing to do
  9153. 6:04:09with the opponent being played against
  9154. 6:04:12let us proceed to the next topic of this
  9155. 6:04:15lesson in the next screen in this topic
  9156. 6:04:17we will learn in detail about hypothesis
  9157. 6:04:20testing with non-normal data
  9158. 6:04:23let us begin with the mon whitney test
  9159. 6:04:25in the next screen
  9160. 6:04:27the mon whitney test also known as the
  9161. 6:04:30wilcoxon rank sum test is a
  9162. 6:04:32non-parametric test which is used to
  9163. 6:04:35compare two unpaired groups
  9164. 6:04:37in this test the value of alpha is by
  9165. 6:04:40default set at 0.05 and the rejection
  9166. 6:04:44and acceptance condition remains the
  9167. 6:04:46same for different cases
  9168. 6:04:48that is if p is less than alpha reject
  9169. 6:04:51the null hypothesis
  9170. 6:04:53if p is greater than alpha reject the
  9171. 6:04:56alternate hypothesis
  9172. 6:04:58the aim of this test is to rank the
  9173. 6:05:00entire data available for each condition
  9174. 6:05:03and then compare the total outcome of
  9175. 6:05:05the two ranks
  9176. 6:05:06click the button to know the steps to
  9177. 6:05:08perform the mon whitney test
  9178. 6:05:12to perform the mon whitney test first
  9179. 6:05:15rank all the values from low to high
  9180. 6:05:17without paying any attention to the
  9181. 6:05:19group to which each value belongs
  9182. 6:05:21the smallest number gets a rank of one
  9183. 6:05:24the largest number gets a rank of n
  9184. 6:05:26where n is the total number of values in
  9185. 6:05:29the two groups
  9186. 6:05:30if there are ties continue to rank the
  9187. 6:05:33values anyway pretending they are
  9188. 6:05:35slightly different
  9189. 6:05:37then find the average of the ranks for
  9190. 6:05:39all the identical values and assign that
  9191. 6:05:42rank to all these values
  9192. 6:05:44continue this till all the whole number
  9193. 6:05:46ranks have been used
  9194. 6:05:48next sort the values into two groups
  9195. 6:05:52these can now be used for the mon
  9196. 6:05:53whitney u test
  9197. 6:05:55summate the ranks for the observations
  9198. 6:05:57from sample one and then summate the
  9199. 6:05:59ranks in sample two larger group
  9200. 6:06:04let us look at an example of the mon
  9201. 6:06:06whitney test in this screen
  9202. 6:06:09suppose you have two sets of data g1 and
  9203. 6:06:12g2
  9204. 6:06:13the g1 values are 14 2 5 16 and 9
  9205. 6:06:19and the g2 values are 4 2 18 14 and 8.
  9206. 6:06:24now combine the g1 and g2 values sort
  9207. 6:06:28them in ascending order and mention the
  9208. 6:06:30group name against each value
  9209. 6:06:33next rank the groups from 1 to 10 and
  9210. 6:06:36check if any values are identical
  9211. 6:06:39take an average of the ranks of the
  9212. 6:06:40identical values and place it against
  9213. 6:06:43the identical values in the final rank
  9214. 6:06:45column
  9215. 6:06:46hence the average final rank is 1.5 for
  9216. 6:06:49ranks 1 and 2.
  9217. 6:06:51similarly the average final rank is 7.5
  9218. 6:06:55for ranks 7 and 8.
  9219. 6:06:57next calculate r1 and r2 by adding the
  9220. 6:07:00ranks of the groups 1 and 2 respectively
  9221. 6:07:04in this example the r 1 value is 28 and
  9222. 6:07:07our 2 value is 27
  9223. 6:07:10from the given data 5 is the value of
  9224. 6:07:12both n1 and n2
  9225. 6:07:16the formula for the mon whitney u test
  9226. 6:07:19for n one and n two values is
  9227. 6:07:21u one equals n one multiplied by n two
  9228. 6:07:25plus n one multiplied by n one plus one
  9229. 6:07:28whole divided by two minus r one
  9230. 6:07:31similarly u2 equals n1 multiplied by n2
  9231. 6:07:35plus n2 multiplied by n2 plus 1 whole
  9232. 6:07:39divided by 2 minus r2
  9233. 6:07:42in this example the value of u1 is 12
  9234. 6:07:45and u2 is 13.
  9235. 6:07:48now the u value can be calculated by
  9236. 6:07:51taking the minimum value among 12 and 13
  9237. 6:07:54which is 12.
  9238. 6:07:55look up the mon whitney u test table for
  9239. 6:07:58n 1 equals five and n two equals five
  9240. 6:08:01you will get the critical value of u as
  9241. 6:08:04two
  9242. 6:08:05to be statistically significant the
  9243. 6:08:07obtained u has to be equal to or less
  9244. 6:08:10than this critical value
  9245. 6:08:12our calculated value of u is 12 which is
  9246. 6:08:15not less than two that means there is no
  9247. 6:08:18statistical difference between the means
  9248. 6:08:20of the two groups
  9249. 6:08:22in this screen we will learn about the
  9250. 6:08:24kruskal-wallis test
  9251. 6:08:26the kruskal-wallis test is named after
  9252. 6:08:28william kruskal and w alan wallace
  9253. 6:08:31it is also a non-parametric test used
  9254. 6:08:34for testing the source of origin of
  9255. 6:08:36samples for example whether the samples
  9256. 6:08:39originate from the same distribution or
  9257. 6:08:41not
  9258. 6:08:42the characteristics of the
  9259. 6:08:43kruskal-wallis test are as follows
  9260. 6:08:46it is the only way to analyze variants
  9261. 6:08:49by ranks
  9262. 6:08:50this test compares the medians of two or
  9263. 6:08:53more samples to find out if the samples
  9264. 6:08:55are from different populations
  9265. 6:08:58since this test is a non-parametric
  9266. 6:09:00method it does not assume the normal
  9267. 6:09:03distribution of the residuals unlike the
  9268. 6:09:06analogous one-way analysis of variance
  9269. 6:09:09for this test the null hypothesis is
  9270. 6:09:12that the medians of all groups are equal
  9271. 6:09:15and the alternate hypothesis is that at
  9272. 6:09:18least one population median of one group
  9273. 6:09:21is different from the population median
  9274. 6:09:23of at least one other group
  9275. 6:09:25let us learn about the moods median in
  9276. 6:09:27the next screen
  9277. 6:09:30the mood's median is also a
  9278. 6:09:32non-parametric test that is used to test
  9279. 6:09:34the equality of medians from two or more
  9280. 6:09:37different populations
  9281. 6:09:39this test works when the output y
  9282. 6:09:41variable is continuous and discrete
  9283. 6:09:44ordinal or discrete count
  9284. 6:09:46while the input x variable is discrete
  9285. 6:09:48with two or more attributes
  9286. 6:09:51click the button to view the steps
  9287. 6:09:52involved in the mood's median test
  9288. 6:09:56following are the steps in the mood's
  9289. 6:09:58median test
  9290. 6:10:00first find the median of the combined
  9291. 6:10:02data set
  9292. 6:10:03next find the number of values in each
  9293. 6:10:05sample that are greater than the median
  9294. 6:10:07and form a contingency table
  9295. 6:10:10then find the expected value for each
  9296. 6:10:12cell and finally find the chi-square
  9297. 6:10:14value
  9298. 6:10:16we will learn about the freedmen test in
  9299. 6:10:18this screen the friedman test is another
  9300. 6:10:21form of a non-parametric test
  9301. 6:10:24it does not make any assumptions about
  9302. 6:10:26the specific shape of the population
  9303. 6:10:28from which the sample is drawn
  9304. 6:10:31and therefore allows smaller sample data
  9305. 6:10:33sets to be analyzed
  9306. 6:10:35unlike anova the friedman test does not
  9307. 6:10:38require the data set to be randomly
  9308. 6:10:40sampled from normally distributed
  9309. 6:10:42populations with equal variances
  9310. 6:10:45this test uses a two-tailed hypothesis
  9311. 6:10:48test
  9312. 6:10:49where the null hypothesis is that the
  9313. 6:10:52population medians of each treatment are
  9314. 6:10:54statistically identical to the rest of
  9315. 6:10:56the group
  9316. 6:10:58in the next screen we will learn about
  9317. 6:10:59the one sample sign test
  9318. 6:11:03the one sample sign test is the simplest
  9319. 6:11:06of all the non-parametric tests that can
  9320. 6:11:08be used instead of a one-sample t-test
  9321. 6:11:11it is similar to the concept of testing
  9322. 6:11:14if a coin is fair in showing heads or
  9323. 6:11:16tails
  9324. 6:11:17here the null hypothesis represented as
  9325. 6:11:20h o
  9326. 6:11:21is the hypothecated median or assumed
  9327. 6:11:24median of the sample which belongs to
  9328. 6:11:26the population
  9329. 6:11:27click the button to view the steps
  9330. 6:11:29involved in the one sample sign test
  9331. 6:11:33following are the steps in a one sample
  9332. 6:11:36sign test
  9333. 6:11:37first count the number of positive
  9334. 6:11:39values
  9335. 6:11:40these are the values that are larger
  9336. 6:11:42than the hypothesized median
  9337. 6:11:44next count the number of negative values
  9338. 6:11:47these are the values that are smaller
  9339. 6:11:49than the hypothesized median
  9340. 6:11:51finally test the values to check if
  9341. 6:11:53there are significantly more positive
  9342. 6:11:56values or negative values than expected
  9343. 6:12:00this screen will focus on the one sample
  9344. 6:12:02wilcoxon test
  9345. 6:12:04the one sample wilcoxon test also known
  9346. 6:12:07as the wilcoxon signed rank test
  9347. 6:12:10is another form of a non-parametric test
  9348. 6:12:13this test is equivalent to the
  9349. 6:12:15parametric one-sample t-test and more
  9350. 6:12:18powerful than the non-parametric
  9351. 6:12:20one-sample sign test
  9352. 6:12:22let us discuss the characteristics of
  9353. 6:12:24this test in the following screen
  9354. 6:12:27some of the characteristics of this test
  9355. 6:12:29are as follows
  9356. 6:12:31this test assumes that the sample is
  9357. 6:12:33randomly taken from a population
  9358. 6:12:35with a symmetric frequency distribution
  9359. 6:12:37around the median
  9360. 6:12:39also in this test the symmetry can be
  9361. 6:12:42observed with the histogram or by
  9362. 6:12:44checking if the median and mean are
  9363. 6:12:46approximately equal
  9364. 6:12:48the conclusion in this test is that if
  9365. 6:12:50the value is on the midpoint you can
  9366. 6:12:53continue and accept the null hypothesis
  9367. 6:12:56if not you need to reject the alternate
  9368. 6:12:58hypothesis
  9369. 6:13:00click the button given on the screen to
  9370. 6:13:02view an example
  9371. 6:13:05let us consider an example
  9372. 6:13:07the median customer satisfaction score
  9373. 6:13:09of an organization has always been 3.7
  9374. 6:13:13and the management wants to see if this
  9375. 6:13:15has changed
  9376. 6:13:17they conduct a survey and get the
  9377. 6:13:18results grouped by the customer type
  9378. 6:13:21the conclusion will be as follows
  9379. 6:13:24if the median value is 3.7 the null
  9380. 6:13:27hypothesis h o can be accepted if not
  9381. 6:13:31the alternate hypothesis needs to be
  9382. 6:13:33rejected the alpha value will be 0.05
  9383. 6:13:38choose from over 300 in-demand skills
  9384. 6:13:40and get access to 1 000 plus hours of
  9385. 6:13:43video content for free visit scale up by
  9386. 6:13:45simply learn click on the link in the
  9387. 6:13:47description to know more
  9388. 6:13:49this lesson will focus on the improved
  9389. 6:13:51phase of the dmacc process
  9390. 6:13:54the improved phase comes after the
  9391. 6:13:56analyze phase
  9392. 6:13:57in the analyze phase the data was
  9393. 6:13:59analyzed and some patterns were found to
  9394. 6:14:02identify where the problem lies
  9395. 6:14:05design of experiments or doe consists of
  9396. 6:14:08a series of planned and scientific
  9397. 6:14:10experiments that test various input
  9398. 6:14:12variables and their eventual impact on
  9399. 6:14:15the output variable
  9400. 6:14:17design of experiments can be used as a
  9401. 6:14:19one-stop alternative for analyzing all
  9402. 6:14:22influencing factors to arrive at a
  9403. 6:14:24successful model
  9404. 6:14:26doe is applicable where multiple input
  9405. 6:14:28variables known as factors affect a
  9406. 6:14:31single response variable
  9407. 6:14:33an output variable is the variable which
  9408. 6:14:35may get affected due to multiple input
  9409. 6:14:38variables
  9410. 6:14:39doe is preferred over one factor at a
  9411. 6:14:42time or o fat experiments because it
  9412. 6:14:44does not miss interactions
  9413. 6:14:47with techniques like blocking
  9414. 6:14:48experimental error can be eliminated
  9415. 6:14:51the trials should be randomized to avoid
  9416. 6:14:54concluding that a factor is significant
  9417. 6:14:56when the time at which it is measured or
  9418. 6:14:57the sequence followed may have
  9419. 6:14:59influenced the responses result
  9420. 6:15:01an example of blocking is highlighted in
  9421. 6:15:03the table given on the screen
  9422. 6:15:06with techniques like replication many
  9423. 6:15:08experiments can be conducted to ensure a
  9424. 6:15:10robust model
  9425. 6:15:12we will understand the concept of design
  9426. 6:15:14experiments through an example in the
  9427. 6:15:16upcoming screen
  9428. 6:15:18to understand doe and the main effects
  9429. 6:15:21consider the following example
  9430. 6:15:23suppose the objective of the experiment
  9431. 6:15:26is to achieve uniform part dimensions at
  9432. 6:15:28a particular target value to reduce
  9433. 6:15:30variations
  9434. 6:15:32the inputs x or factors that affect the
  9435. 6:15:35output are cycle time mold temperature
  9436. 6:15:38holding pressure
  9437. 6:15:39holding time and material type
  9438. 6:15:42the process is the molding process and
  9439. 6:15:45the output or the response of the
  9440. 6:15:46experiment is the part hardness
  9441. 6:15:49the components of the doe in this
  9442. 6:15:51example will be described in the next
  9443. 6:15:53screen
  9444. 6:15:57output response factors levels and
  9445. 6:16:00interactions are the components of the
  9446. 6:16:01doe in the given example
  9447. 6:16:04click each component to learn more
  9448. 6:16:07the response variable is the part
  9449. 6:16:09hardness and is measured as a result of
  9450. 6:16:11the experiment and is used to judge the
  9451. 6:16:14effects of factors
  9452. 6:16:16factors of this experimental setup are
  9453. 6:16:19cycle time mold temperature holding
  9454. 6:16:21pressure holding time and material type
  9455. 6:16:26factors can be varied and are called
  9456. 6:16:28levels the molding temperature can be
  9457. 6:16:30set at 600 degrees fahrenheit or 700
  9458. 6:16:34degrees fahrenheit
  9459. 6:16:35plastic type can be fillers and no
  9460. 6:16:38fillers and the material type has two
  9461. 6:16:40levels of nylon or acetyl
  9462. 6:16:45interactions refer to the degree to
  9463. 6:16:47which factors depend on one another
  9464. 6:16:50some experiments evaluate the effect of
  9465. 6:16:52interactions
  9466. 6:16:54in the molding example the interaction
  9467. 6:16:56between cycle time and molding
  9468. 6:16:58temperature is critical
  9469. 6:17:01the best level for time depends on what
  9470. 6:17:03temperature is set
  9471. 6:17:05if the temperature level is higher the
  9472. 6:17:07cycle time may have to be decreased to
  9473. 6:17:10achieve the same response from the
  9474. 6:17:12experiment
  9475. 6:17:14let us understand full factorial
  9476. 6:17:17experiments through an example
  9477. 6:17:19full factorial experimental design
  9478. 6:17:22contains all combinations of all levels
  9479. 6:17:24of all factors
  9480. 6:17:26this experimental design ensures no
  9481. 6:17:29possible treatment combinations get
  9482. 6:17:30omitted
  9483. 6:17:32hence full factorial designs are often
  9484. 6:17:34preferred over other designs
  9485. 6:17:37the table shown here is for a two-way
  9486. 6:17:39heat treatment experiment
  9487. 6:17:41there are two factors
  9488. 6:17:43oven time x2 and the temperature x1 at
  9489. 6:17:47which the material is drawn out of the
  9490. 6:17:49oven
  9491. 6:17:50the output y of the experiment is the
  9492. 6:17:52hardness of the material
  9493. 6:17:54each of the factors has two levels
  9494. 6:17:57this example illustrates the concepts of
  9495. 6:18:00main factor and interaction effects
  9496. 6:18:03from the table it is clear that without
  9497. 6:18:05repetition the experiment will have four
  9498. 6:18:07different outcomes based on the changes
  9499. 6:18:10in levels of factors
  9500. 6:18:12each experimental trial here is repeated
  9501. 6:18:15to give a total of eight values
  9502. 6:18:17let us now analyze the mean effect
  9503. 6:18:20an analysis of the means helps in
  9504. 6:18:23understanding how a change in
  9505. 6:18:24temperature at which the material is
  9506. 6:18:26drawn creates a difference in the
  9507. 6:18:28average part hardness
  9508. 6:18:30this affects the output and is called
  9509. 6:18:32the main effect
  9510. 6:18:34analysis of means also tells how a
  9511. 6:18:36change in oven time creates a difference
  9512. 6:18:38in the average part hardness
  9513. 6:18:40this is also the main effect
  9514. 6:18:43analysis of means explains how
  9515. 6:18:45interaction between temperature and time
  9516. 6:18:48affects the average part hardness
  9517. 6:18:50this is known as the interaction effect
  9518. 6:18:53let us next understand the concept of
  9519. 6:18:56main effect for calculating the main
  9520. 6:18:59effect the means have to be calculated
  9521. 6:19:02hence to calculate the main effect of
  9522. 6:19:04draw temperature the mean of the
  9523. 6:19:06hardness values has to be calculated
  9524. 6:19:09the values are populated in the
  9525. 6:19:10corresponding columns of draw
  9526. 6:19:12temperatures
  9527. 6:19:13the columns have been labeled a1 and a2
  9528. 6:19:17the value of the mean of a1 is 91
  9529. 6:19:20and of a2 is 82.
  9530. 6:19:23plotting the data on a graph shows that
  9531. 6:19:26changing draw temperatures changes the
  9532. 6:19:28average hardness
  9533. 6:19:30similarly we calculate the mean of
  9534. 6:19:32hardness values in b1 and b2
  9535. 6:19:36the values are 87 and 86 which are
  9536. 6:19:39plotted on a graph
  9537. 6:19:41it can be seen that changing the oven
  9538. 6:19:43time does not affect the average
  9539. 6:19:45hardness
  9540. 6:19:47now let us understand how the
  9541. 6:19:49interaction between temperature and time
  9542. 6:19:51affects the average part hardness to
  9543. 6:19:54check how draw temperature and oven time
  9544. 6:19:56interact
  9545. 6:19:57the mean values are calculated by taking
  9546. 6:20:00the repetition response
  9547. 6:20:02hence the cell a1 b1 has the mean of the
  9548. 6:20:05values 90 and 87. the cell a2 b1 has the
  9549. 6:20:10mean of the values 84 and 87.
  9550. 6:20:14after the mean values are calculated
  9551. 6:20:16they are plotted on a graph
  9552. 6:20:18the graph shows that to reduce
  9553. 6:20:20interactions
  9554. 6:20:21low temperature and high oven time
  9555. 6:20:24should be selected to have the desired
  9556. 6:20:26output of high hardness
  9557. 6:20:28also called renault hardness
  9558. 6:20:30if low hardness is the desired output
  9559. 6:20:33the experimental setup should have high
  9560. 6:20:36draw temperature and high oven time
  9561. 6:20:39the ideal case is represented by the
  9562. 6:20:41parallel lines which give the desired
  9563. 6:20:44output based on the main effect without
  9564. 6:20:46being affected by the interaction
  9565. 6:20:48between the factors the parallel lines
  9566. 6:20:51are shown as a dotted line
  9567. 6:20:53the mean of the factors are also
  9568. 6:20:55calculated and shown in the small table
  9569. 6:20:59in this we will introduce the concept of
  9570. 6:21:01runs in design of experiments
  9571. 6:21:04the numbers of experiments in a doe
  9572. 6:21:06setting is known as runs
  9573. 6:21:09a full factorial experiment without
  9574. 6:21:11replication on five factors and two
  9575. 6:21:13levels is two raised to the power of
  9576. 6:21:16five which equals 32 runs
  9577. 6:21:19a full factorial experiment with one
  9578. 6:21:21replication on five factors and two
  9579. 6:21:24levels is 32 plus 32 which equals 64
  9580. 6:21:28runs
  9581. 6:21:29a half fractional factorial experiment
  9582. 6:21:32without replication on five factors and
  9583. 6:21:35two levels is two raised to the power of
  9584. 6:21:37five minus one which equals sixteen runs
  9585. 6:21:42a half factorial experiment with one
  9586. 6:21:44replication on five factors and two
  9587. 6:21:46levels is 16 plus 16 which equals 32
  9588. 6:21:50runs
  9589. 6:21:52the number of combinations can be
  9590. 6:21:53determined using the formula l to the
  9591. 6:21:56power of f where l is the number of
  9592. 6:21:58levels and f is the number of factors
  9593. 6:22:01half fractional factorial is calculated
  9594. 6:22:03using the formula l to the power f minus
  9595. 6:22:06one
  9596. 6:22:07at three levels five factors full
  9597. 6:22:10factorial experiment would amount to 243
  9598. 6:22:13trials and half factorial experiments
  9599. 6:22:16would require 81 trials
  9600. 6:22:18the difference between full factorial
  9601. 6:22:20and half fractional factorial
  9602. 6:22:22experiments can be seen from the number
  9603. 6:22:24of runs
  9604. 6:22:26let us proceed to the next topic of this
  9605. 6:22:28lesson in the following screen
  9606. 6:22:31in this topic we will discuss root cause
  9607. 6:22:34analysis in detail
  9608. 6:22:36we will learn about residuals analysis
  9609. 6:22:38in the following screen
  9610. 6:22:42while performing the regression analysis
  9611. 6:22:45of a linear or non-linear model
  9612. 6:22:47you will get a model with the predicted
  9613. 6:22:49values
  9614. 6:22:50some of the data might fit within that
  9615. 6:22:52model whereas others may be scattered
  9616. 6:22:54across the modeled equation predicts one
  9617. 6:22:57value for y at level x
  9618. 6:23:00however the actual value for y observed
  9619. 6:23:03at that level of x is different from the
  9620. 6:23:05predicted value
  9621. 6:23:07this difference between the observed
  9622. 6:23:09value of the dependent variable y
  9623. 6:23:12and the predicted value is called
  9624. 6:23:14residual
  9625. 6:23:15the formula to calculate residual is
  9626. 6:23:18observed value minus predicted value
  9627. 6:23:21residuals are considered to be errors
  9628. 6:23:24and each data point has one residual
  9629. 6:23:26you can validate the assumptions on
  9630. 6:23:28random errors as they are independent
  9631. 6:23:31exhibit normal distribution have a
  9632. 6:23:33constant various sigma square for all
  9633. 6:23:35the settings of the independent
  9634. 6:23:37variables and finally have a mean as
  9635. 6:23:40zero
  9636. 6:23:41in the next slide we will continue to
  9637. 6:23:43discuss residuals analysis
  9638. 6:23:46as discussed in the previous screen
  9639. 6:23:49while performing any regression analysis
  9640. 6:23:51you will observe that not all the data
  9641. 6:23:53fits into the linear model
  9642. 6:23:56as the linear regression model is not
  9643. 6:23:58always appropriate for the data
  9644. 6:24:00therefore you should assess the
  9645. 6:24:02appropriateness of the model by defining
  9646. 6:24:05residuals and examining the residual
  9647. 6:24:07plots
  9648. 6:24:09if all assumptions are satisfied the
  9649. 6:24:11residuals should randomly vary around
  9650. 6:24:14zero
  9651. 6:24:15and the spread of the residuals should
  9652. 6:24:17be the same throughout the plot
  9653. 6:24:19that is no systematic patterns are
  9654. 6:24:21observed
  9655. 6:24:23remember in residuals analysis both the
  9656. 6:24:26sum and the mean of the residuals are
  9657. 6:24:28zero
  9658. 6:24:30residuals and diagnostic statistics
  9659. 6:24:32allow you to identify patterns that
  9660. 6:24:34either poorly fit in the model with a
  9661. 6:24:37strong influence on the estimated
  9662. 6:24:38parameters
  9663. 6:24:40or have a high leverage
  9664. 6:24:42it is helpful to interpret these
  9665. 6:24:44diagnostics together to understand any
  9666. 6:24:46potential problems with the model
  9667. 6:24:49in the next screen we will learn about
  9668. 6:24:51data transformation using the box cox
  9669. 6:24:54method the available data must be
  9670. 6:24:56transformed when it does not exhibit the
  9671. 6:24:58normal distribution
  9672. 6:25:00box and cox in the year 1964 developed a
  9673. 6:25:03procedure for estimating the best
  9674. 6:25:05transformation to normality within the
  9675. 6:25:07family of power transformation
  9676. 6:25:10it works by taking the current y data
  9677. 6:25:12and raising it to the power known as
  9678. 6:25:14lambda
  9679. 6:25:15the formula for transformation of y is
  9680. 6:25:18represented as y asterisk equals y to
  9681. 6:25:21the power lambda minus one
  9682. 6:25:24the whole divided by lambda
  9683. 6:25:26this formula is used where the value of
  9684. 6:25:28lambda is not zero if the value of
  9685. 6:25:31lambda is zero you can use natural
  9686. 6:25:33logarithm to transform y
  9687. 6:25:36the family of power transformations can
  9688. 6:25:38be used for the following
  9689. 6:25:40for converting a data set so that
  9690. 6:25:42parametric statistics can be used
  9691. 6:25:44here lambda is a parameter to be defined
  9692. 6:25:47from the data
  9693. 6:25:48for any continuous data greater than
  9694. 6:25:50zero this will not work when the values
  9695. 6:25:53are less than or equal to zero
  9696. 6:25:55transforming specs
  9697. 6:25:57note that the use of the transformation
  9698. 6:25:59does not guarantee normality
  9699. 6:26:02in the next screen we will continue the
  9700. 6:26:04discussion on data transformation using
  9701. 6:26:06box and cox
  9702. 6:26:09the table on the screen shows how the
  9703. 6:26:11data can be transformed using lambda
  9704. 6:26:14the first column lists down values of
  9705. 6:26:16lambda and the second column shows the
  9706. 6:26:18transformed value
  9707. 6:26:20if the value of lambda is negative 2 it
  9708. 6:26:23becomes y to the power negative two
  9709. 6:26:25after the transformation which is one
  9710. 6:26:27divided by y square
  9711. 6:26:29similarly if the value of lambda is
  9712. 6:26:32negative one after transformation it
  9713. 6:26:34becomes y to the power of negative one
  9714. 6:26:36which is one divided by y and so on note
  9715. 6:26:39that you will use a different formula
  9716. 6:26:41when you have the value of lambda as
  9717. 6:26:43zero wherein you will take natural log
  9718. 6:26:46of the value y
  9719. 6:26:48similarly transform values are also
  9720. 6:26:51shown on the screen
  9721. 6:26:52click the example button to know more
  9722. 6:26:56let us look at an example of how data
  9723. 6:26:58transformation is done using box
  9724. 6:27:02the difference between original data and
  9725. 6:27:04the data transformed using box is
  9726. 6:27:06shown on the screen
  9727. 6:27:08figure one shows the original data
  9728. 6:27:10plotted on a histogram
  9729. 6:27:12here you can see that this data is
  9730. 6:27:14abnormal
  9731. 6:27:16in figure two the box and cox procedure
  9732. 6:27:18is applied on the original data and it
  9733. 6:27:21is transformed
  9734. 6:27:23you can see that the data in the second
  9735. 6:27:25figure is more normal than figure one
  9736. 6:27:28let us learn about process input and
  9737. 6:27:30output variables in the following screen
  9738. 6:27:34process improvement has a few
  9739. 6:27:36prerequisites before a process can be
  9740. 6:27:39improved it must first be measured to
  9741. 6:27:41assess the level of improvement required
  9742. 6:27:44the first step is to know the input
  9743. 6:27:46variables and output variables and check
  9744. 6:27:49for any relationship
  9745. 6:27:51the sipoc map and the cause and effect
  9746. 6:27:54matrix are very helpful
  9747. 6:27:56there are many ways to measure the key
  9748. 6:27:58process variables
  9749. 6:28:00metrics such as the percent defective
  9750. 6:28:02operation costs elapsed time
  9751. 6:28:05backlog quantity and documentation
  9752. 6:28:08errors can be used
  9753. 6:28:10critical variables are best identified
  9754. 6:28:12by the process owners
  9755. 6:28:14once they are identified cause and
  9756. 6:28:16effect tools are used to establish the
  9757. 6:28:18relationship between variables
  9758. 6:28:21a cause and effect matrix is shown on
  9759. 6:28:23the screen
  9760. 6:28:24the key process input variables have
  9761. 6:28:27been listed vertically
  9762. 6:28:28and the key process output variables
  9763. 6:28:31horizontally
  9764. 6:28:32for each of the output variables a
  9765. 6:28:34prioritization number is assigned
  9766. 6:28:37numbers which reflect the effect of each
  9767. 6:28:39input variable on the output variable
  9768. 6:28:42are entered in the matrix
  9769. 6:28:44the process output priority is
  9770. 6:28:47multiplied with the input variables to
  9771. 6:28:49arrive at the results for each input
  9772. 6:28:51variable
  9773. 6:28:52the values are added to determine the
  9774. 6:28:54results for each input variable
  9775. 6:28:57for process input variable 1 the output
  9776. 6:29:00variables are 3 4 and 7 with a
  9777. 6:29:04prioritization value of 4 7 and 11
  9778. 6:29:07respectively
  9779. 6:29:08therefore multiplying the output
  9780. 6:29:10variables with their corresponding
  9781. 6:29:12prioritization numbers and adding those
  9782. 6:29:15gives one hundred seventeen
  9783. 6:29:17which is around thirty three percent of
  9784. 6:29:18the total effect
  9785. 6:29:20the process input variables results are
  9786. 6:29:23compared to each other to determine
  9787. 6:29:25which input variable has the greatest
  9788. 6:29:27effect on the output variables
  9789. 6:29:30click the cause and effect matrix
  9790. 6:29:32template button to view another template
  9791. 6:29:36a sample of the cause effect matrix or
  9792. 6:29:38ce matrix is shown here
  9793. 6:29:41the ce matrix gives the correlation
  9794. 6:29:43between input and output variables
  9795. 6:29:47in this screen we will discuss the steps
  9796. 6:29:49to update the ce matrix
  9797. 6:29:52the steps for updating the cause and
  9798. 6:29:53effect matrix r
  9799. 6:29:56list the input variables vertically
  9800. 6:29:58under the column process inputs
  9801. 6:30:00list the output variables horizontally
  9802. 6:30:03under the numbers 1 to 15.
  9803. 6:30:06these output variables are important
  9804. 6:30:08from the customer's perspective
  9805. 6:30:10one can refer to either the qfd or the
  9806. 6:30:13ctq tree to know the key output
  9807. 6:30:16variables
  9808. 6:30:17rank the output variables based on
  9809. 6:30:20customer priority
  9810. 6:30:22these numbers can also be taken from the
  9811. 6:30:23qfd
  9812. 6:30:25the input variables with the highest
  9813. 6:30:27score become the point of focus in the
  9814. 6:30:29project
  9815. 6:30:30another method to establish the cause
  9816. 6:30:32effect relation is the cause and effect
  9817. 6:30:35diagram
  9818. 6:30:36this is explained in detail in the
  9819. 6:30:38following screen
  9820. 6:30:39the cause and effect diagram is used to
  9821. 6:30:42find the root cause and the potential
  9822. 6:30:44solutions to a problem
  9823. 6:30:46a cause and effect diagram breaks down a
  9824. 6:30:49problem into bite-sized pieces and also
  9825. 6:30:52displays the possible causes in a
  9826. 6:30:54graphic manner
  9827. 6:30:55it is also known as the fishbone the 4m
  9828. 6:30:59or the ishikawa diagram
  9829. 6:31:02it is commonly used to examine effects
  9830. 6:31:04or problems to find out the possible
  9831. 6:31:06causes and to indicate the possible
  9832. 6:31:09areas to collect data
  9833. 6:31:11the steps involved in the cause and
  9834. 6:31:13effect diagram are
  9835. 6:31:15all the possible causes of the problem
  9836. 6:31:17or effects selected for analysis are
  9837. 6:31:19brainstormed
  9838. 6:31:21the major causes are classified under
  9839. 6:31:23the headings of materials methods
  9840. 6:31:26machinery and manpower
  9841. 6:31:29the cause and effect diagram is drawn
  9842. 6:31:31with the problem at the point of the
  9843. 6:31:33central access line and the causes on
  9844. 6:31:35the diagram are written under the
  9845. 6:31:37classifications chosen
  9846. 6:31:40the next screen illustrates the cause
  9847. 6:31:42and effect diagram with the help of an
  9848. 6:31:44example
  9849. 6:31:47the diagram shows the cause and effect
  9850. 6:31:49diagram for the possible causes of
  9851. 6:31:51solder defects on a reflow soldering
  9852. 6:31:53line
  9853. 6:31:54this diagram helps in collecting data
  9854. 6:31:57and discovering the root cause
  9855. 6:31:59during brainstorming the group looked at
  9856. 6:32:02all the major causes and then grouped
  9857. 6:32:04them under the main headings
  9858. 6:32:06under materials causes like types of
  9859. 6:32:09solder paste components and the
  9860. 6:32:11components packaging used are considered
  9861. 6:32:14the major causes under methods are
  9862. 6:32:16technology and preventive maintenance
  9863. 6:32:19similarly operator and schedule are
  9864. 6:32:21placed under manpower
  9865. 6:32:23while tools and oven are grouped under
  9866. 6:32:26machinery causes
  9867. 6:32:28the next screen will discuss another
  9868. 6:32:30root cause analysis tool in detail
  9869. 6:32:335y is one of the tools used to analyze
  9870. 6:32:36the root cause of a problem
  9871. 6:32:38the responsibility of the root cause
  9872. 6:32:40analysis lies with the 5y analysis team
  9873. 6:32:44the technical experts have a great
  9874. 6:32:46responsibility as the conclusion will be
  9875. 6:32:48drawn from the way the drill down of the
  9876. 6:32:50symptoms is carried out
  9877. 6:32:53the 5y is a very simple tool as it poses
  9878. 6:32:56the y question to every problem till the
  9879. 6:32:59root cause is obtained
  9880. 6:33:01it is important to know that the 5y tool
  9881. 6:33:04does not restrict the interrogation to 5
  9882. 6:33:06questions
  9883. 6:33:08y can be asked as many times as required
  9884. 6:33:11till the root cause for the problem is
  9885. 6:33:13found
  9886. 6:33:14it can be used along with the cause and
  9887. 6:33:16effect diagram
  9888. 6:33:18the following screen will explain the
  9889. 6:33:19process of the five why technique
  9890. 6:33:23the process for the 5-y technique is
  9891. 6:33:27identify the problem and emphasize the
  9892. 6:33:29problem statement
  9893. 6:33:31arrange for a brainstorming session with
  9894. 6:33:33the team including subject matter
  9895. 6:33:35experts process owners and team members
  9896. 6:33:40explain the purpose and the problem
  9897. 6:33:41statement
  9898. 6:33:43analyze scenarios working backwards from
  9899. 6:33:45the problem
  9900. 6:33:47ask why for the answers obtained until
  9901. 6:33:50the root cause is found
  9902. 6:33:52normally reasons like insufficient
  9903. 6:33:55resources and time become the root
  9904. 6:33:57causes
  9905. 6:33:58if the drill down in brainstorming is
  9906. 6:34:00carried out in the right direction
  9907. 6:34:03it is often found that the root cause is
  9908. 6:34:05related to the process
  9909. 6:34:07therefore the occurrence of a problem is
  9910. 6:34:10often due to the process
  9911. 6:34:12and not an individual or a team
  9912. 6:34:15in the next screen we will understand
  9913. 6:34:17the concept of the five-wide technique
  9914. 6:34:20with the help of an example
  9915. 6:34:23the process for the 5y technique is
  9916. 6:34:26identify the problem and emphasize the
  9917. 6:34:28problem statement
  9918. 6:34:30arrange for a brainstorming session with
  9919. 6:34:32the team including subject matter
  9920. 6:34:34experts process owners and team members
  9921. 6:34:39explain the purpose and the problem
  9922. 6:34:41statement
  9923. 6:34:42analyze scenarios working backwards from
  9924. 6:34:45the problem
  9925. 6:34:46ask why for the answers obtained until
  9926. 6:34:49the root cause is found
  9927. 6:34:52normally reasons like insufficient
  9928. 6:34:54resources and time become the root
  9929. 6:34:56causes
  9930. 6:34:58if the drill down in brainstorming is
  9931. 6:35:00carried out in the right direction
  9932. 6:35:02it is often found that the root cause is
  9933. 6:35:04related to the process
  9934. 6:35:06therefore the occurrence of a problem is
  9935. 6:35:09often due to the process
  9936. 6:35:11and not an individual or a team
  9937. 6:35:15in the next screen we will understand
  9938. 6:35:17the concept of the five why technique
  9939. 6:35:19with the help of an example
  9940. 6:35:22in this topic we will discuss lean tools
  9941. 6:35:25in detail
  9942. 6:35:26let us learn about lean techniques in
  9943. 6:35:28the following screen
  9944. 6:35:30the eight lean techniques are kaizen
  9945. 6:35:32bokayoke 5s just in time kanban jadoka
  9946. 6:35:38tactime and hijanka
  9947. 6:35:40click each technique to know more
  9948. 6:35:44kaizen or continuous improvement is the
  9949. 6:35:47building block of all lean production
  9950. 6:35:49methods
  9951. 6:35:50kaizen philosophy implies that all
  9952. 6:35:52incremental changes routinely applied
  9953. 6:35:55and sustained over a long period of time
  9954. 6:35:57results in significant improvements
  9955. 6:36:02the second technique is pokayoka it is
  9956. 6:36:04also known as mistake proofing
  9957. 6:36:06it is good to do it right the first time
  9958. 6:36:09and even better to make it impossible to
  9959. 6:36:11do it wrong the first time
  9960. 6:36:13the prompt received to save the word
  9961. 6:36:15document before closing it without
  9962. 6:36:17saving is an example of bokoyoka
  9963. 6:36:215s is a set of five japanese words which
  9964. 6:36:24translate to sort
  9965. 6:36:27set in order shine
  9966. 6:36:29standardize and sustain
  9967. 6:36:32this is a simple and yet powerful tool
  9968. 6:36:34of lean
  9969. 6:36:35the sort principle refers to sorting
  9970. 6:36:38items according to a rule
  9971. 6:36:40the rule could be frequency of use or
  9972. 6:36:43time of use
  9973. 6:36:44after sorting the objects are set in
  9974. 6:36:46order
  9975. 6:36:47the place for everything is defined and
  9976. 6:36:50everything is placed accordingly
  9977. 6:36:52cleaning of the area refers to the shine
  9978. 6:36:55principle
  9979. 6:36:56the fourth step requires formation and
  9980. 6:36:58circulation of a set of written
  9981. 6:37:00standards
  9982. 6:37:01the last step refers to sustaining the
  9983. 6:37:04process by following the standards set
  9984. 6:37:06earlier
  9985. 6:37:085s is useful as a framework to create
  9986. 6:37:10and maintain the workplace
  9987. 6:37:14just in time or jit is another lean
  9988. 6:37:18technique
  9989. 6:37:19this technique philosophizes about
  9990. 6:37:21producing the necessary units in the
  9991. 6:37:23necessary quantity at the necessary time
  9992. 6:37:26with the required quality
  9993. 6:37:29as an item is removed from a shelf of a
  9994. 6:37:31super mart the system confirms it and
  9995. 6:37:34automatically sends a note for
  9996. 6:37:35replenishment
  9997. 6:37:37this kind of technique can be used in an
  9998. 6:37:39organization to prevent accumulation of
  9999. 6:37:41inventory
  10000. 6:37:44the fifth technique is known as kanban
  10001. 6:37:46which means signboard in japanese
  10002. 6:37:49kanban utilizes visual display cards to
  10003. 6:37:52signal movement of material between the
  10004. 6:37:54steps of a product process
  10005. 6:37:57this is one of the examples of visual
  10006. 6:37:59control in lean
  10007. 6:38:02the next technique is jiduka
  10008. 6:38:05it means automation with human touch and
  10009. 6:38:07is sometimes known as autonomation
  10010. 6:38:10jiduka implements supervisory function
  10011. 6:38:12in the production line and stops the
  10012. 6:38:14process as soon as a defect is
  10013. 6:38:16encountered
  10014. 6:38:18the process does not start again till
  10015. 6:38:20the root cause of the defect is
  10016. 6:38:21eliminated
  10017. 6:38:24tack time is the maximum time in which
  10018. 6:38:26the customer demands need to be met
  10019. 6:38:29for example a customer needs 100
  10020. 6:38:31products and the company has 420 minutes
  10021. 6:38:34of available production time
  10022. 6:38:36tax time equals time available divided
  10023. 6:38:39by demand
  10024. 6:38:41in this case the company has a maximum
  10025. 6:38:43of 4.2 minutes per product
  10026. 6:38:46this will be the target for the
  10027. 6:38:47production line
  10028. 6:38:50the final technique is hijanka which
  10029. 6:38:52means production leveling and smoothing
  10030. 6:38:55it is a technique to reduce waste
  10031. 6:38:58occurring due to fluctuating customer
  10032. 6:39:00demand
  10033. 6:39:02let us understand the concept of cycle
  10034. 6:39:04time reduction in this screen
  10035. 6:39:07cycle time reduction refers to the
  10036. 6:39:08reduction in the time taken for a
  10037. 6:39:10complete process
  10038. 6:39:12implementing lean techniques reduces
  10039. 6:39:15cycle time
  10040. 6:39:16and releases resources faster than any
  10041. 6:39:19other method
  10042. 6:39:20low cycle time increases productivity
  10043. 6:39:23and throughput
  10044. 6:39:24lean techniques release resources early
  10045. 6:39:27achieving more production with the same
  10046. 6:39:29machinery
  10047. 6:39:30internal and external waste is reduced
  10048. 6:39:33and the operational process is
  10049. 6:39:35simplified with a decrease in product
  10050. 6:39:38damage
  10051. 6:39:39all these factors help in satisfying the
  10052. 6:39:41customer and staying ahead in
  10053. 6:39:43competition
  10054. 6:39:44the following screen describes the
  10055. 6:39:46concept of cycle time reduction through
  10056. 6:39:48an example
  10057. 6:39:50the changes brought by implementing lean
  10058. 6:39:53techniques on an existing process are
  10059. 6:39:55illustrated in the given diagram things
  10060. 6:39:58to be noticed are number of operators
  10061. 6:40:01used work allocation to the operators
  10062. 6:40:04path or the movement in the process and
  10063. 6:40:06flow of the process
  10064. 6:40:08notice the changes brought about by
  10065. 6:40:10implementing lean techniques on the old
  10066. 6:40:12process
  10067. 6:40:13first the path followed by the material
  10068. 6:40:15in between the process is considerably
  10069. 6:40:18reduced
  10070. 6:40:19this decreases the cycle time for the
  10071. 6:40:21entire process
  10072. 6:40:23second the number of operators is
  10073. 6:40:25reduced to 3 when compared to 5 in the
  10074. 6:40:28old process
  10075. 6:40:29operator 1 can now work on process 1 and
  10076. 6:40:32process 4.
  10077. 6:40:34similarly operator 2 can work on process
  10078. 6:40:372 and process 3.
  10079. 6:40:39there is an increased productivity of
  10080. 6:40:41the operators and the remaining skilled
  10081. 6:40:43operators can be used in some other
  10082. 6:40:45process or system
  10083. 6:40:48the next screen will introduce the
  10084. 6:40:49concept of kaizen and kaizen blitz
  10085. 6:40:53kaizen means good change in japanese
  10086. 6:40:57kaizen is a continuous improvement
  10087. 6:40:59method to improve the functions of an
  10088. 6:41:01organization
  10089. 6:41:02the improvements could be in process
  10090. 6:41:04productivity quality technology and
  10091. 6:41:07safety
  10092. 6:41:08it brings in small incremental changes
  10093. 6:41:11to the process
  10094. 6:41:12kaizen blitz is known as kaizen event or
  10095. 6:41:16kaizen workshop if the event is tightly
  10096. 6:41:19defined and the scope is evident for
  10097. 6:41:21implementation
  10098. 6:41:22processes can be easily changed and
  10099. 6:41:25improved
  10100. 6:41:26teams could improve processes through
  10101. 6:41:28creative problem solving methods in
  10102. 6:41:30structured workshops over a short time
  10103. 6:41:32scale
  10104. 6:41:33the next screen will provide the
  10105. 6:41:35differences between kaizen and kaizen
  10106. 6:41:38blitz
  10107. 6:41:39the differences between kaizen and
  10108. 6:41:41kaizen blitz are
  10109. 6:41:44kaizen is a method that brings
  10110. 6:41:46continuous improvement in the
  10111. 6:41:47organization
  10112. 6:41:49while kaizen blitz is a workshop or an
  10113. 6:41:51event that brings in change
  10114. 6:41:54kaizen brings in small incremental
  10115. 6:41:56changes in the organization
  10116. 6:41:58there are no major changes made within
  10117. 6:42:01the processes
  10118. 6:42:02kaizen blitz is applied when a rapid
  10119. 6:42:05solution is required
  10120. 6:42:07the kaizen method follows a step-by-step
  10121. 6:42:09process
  10122. 6:42:11it standardizes measures and compares
  10123. 6:42:13the process with the requirement before
  10124. 6:42:16improving it
  10125. 6:42:17kaizen blitz plans for the event
  10126. 6:42:20executes it arrives at a solution and
  10127. 6:42:22follows it through
  10128. 6:42:24all the people of the organization are
  10129. 6:42:26involved in kaizen whereas kaizen blitz
  10130. 6:42:29is led by the top management and others
  10131. 6:42:31are invited to participate
  10132. 6:42:34the decision making lies with the upper
  10133. 6:42:36management
  10134. 6:42:37in kaizen the process is standardized
  10135. 6:42:40and measurements are regularly collected
  10136. 6:42:42and compared before the decision is
  10137. 6:42:44taken this relatively delays the process
  10138. 6:42:48of decision making
  10139. 6:42:49in kaizen blitz decisions are taken soon
  10140. 6:42:53and the process change is wrapped in
  10141. 6:42:55three to five days
  10142. 6:42:57kaizen is a continuous improvement
  10143. 6:42:59method whereas the kaizen blitz is part
  10144. 6:43:02of the improving process
  10145. 6:43:04kaizen follows pdca in essence plan do
  10146. 6:43:08and check and act for the improvement
  10147. 6:43:10process
  10148. 6:43:11kaizen blitz uses pdca for execution
  10149. 6:43:15where the events are planned conducted
  10150. 6:43:17decided implemented and followed up
  10151. 6:43:21the following screen will elaborate on
  10152. 6:43:22the concepts of kaizen and kaizen blitz
  10153. 6:43:25through examples
  10154. 6:43:28kaizen and kaizen blitz are practiced in
  10155. 6:43:30many organizations across the world
  10156. 6:43:33the examples of kaizen and kaizen blitz
  10157. 6:43:36method are shown here
  10158. 6:43:37click each tab to know more
  10159. 6:43:41the toyota production system is known
  10160. 6:43:43for kaizen practices
  10161. 6:43:45in toyota if any issue arises in the
  10162. 6:43:48production line the line personnel sees
  10163. 6:43:51all the production until the issue is
  10164. 6:43:53resolved
  10165. 6:43:54once the solution is implemented the
  10166. 6:43:56team resumes the production cycle
  10167. 6:44:00a wood window company in the state of
  10168. 6:44:02iowa us uses the kaizen blitz method to
  10169. 6:44:06redesign their shop floor and replace
  10170. 6:44:08expensive non-flexible automation with
  10171. 6:44:11low-cost highly flexible cellular
  10172. 6:44:14applications
  10173. 6:44:15eliminating scraps reorganizing work
  10174. 6:44:18areas and reducing inventory are some of
  10175. 6:44:20the examples of quick implementation
  10176. 6:44:23through kaizen blitz
  10177. 6:44:25the term lien refers to creating more
  10178. 6:44:27value to customers with fewer resources
  10179. 6:44:30it means reducing unwanted activities or
  10180. 6:44:33processes that do not add value to the
  10181. 6:44:35product or service for the customer the
  10182. 6:44:38lean philosophy is to provide perfect
  10183. 6:44:40value to the customer through a perfect
  10184. 6:44:43value creation process that has zero
  10185. 6:44:45waste
  10186. 6:44:46while the ultimate goal is to achieve
  10187. 6:44:48zero waste you may not always get that
  10188. 6:44:51in the first couple of tries
  10189. 6:44:53however you will achieve minimum waste
  10190. 6:44:55and continue to move towards zero waste
  10191. 6:44:57eventually
  10192. 6:44:59hence lean is the path towards
  10193. 6:45:01perfection
  10194. 6:45:03lean is about optimizing the process
  10195. 6:45:05from beginning to end
  10196. 6:45:06eliminating non-value-adding activities
  10197. 6:45:09in vas and increasing flow to ensure
  10198. 6:45:12that parts and services are provided to
  10199. 6:45:14customers more quickly
  10200. 6:45:16if quality is the word to describe six
  10201. 6:45:18sigma then speed is the word to describe
  10202. 6:45:21lean
  10203. 6:45:22let's understand the importance of lean
  10204. 6:45:26there are many benefits of lean and some
  10205. 6:45:28of them are reduced cost reduced cycle
  10206. 6:45:30time
  10207. 6:45:31more throughput and increased
  10208. 6:45:33productivity
  10209. 6:45:35despite all of these benefits lean is
  10210. 6:45:37not implemented by most of the
  10211. 6:45:38organizations because of the
  10212. 6:45:40misconception that it is only suited in
  10213. 6:45:42manufacturing areas
  10214. 6:45:44the reason for this misconception is the
  10215. 6:45:46beginning of lean it began and grew in
  10216. 6:45:49popularity in the manufacturing areas
  10217. 6:45:51starting with toyota
  10218. 6:45:53in recent years one can notice more
  10219. 6:45:56applications of lane in other areas such
  10220. 6:45:58as healthcare and the transactional
  10221. 6:46:00space however the truth is that lean
  10222. 6:46:04concepts can be applied in any business
  10223. 6:46:06and in any process
  10224. 6:46:08on the next screen let's discuss how
  10225. 6:46:10lean and six sigma combine
  10226. 6:46:13lean and six sigma are two different
  10227. 6:46:15principles or methodologies that combine
  10228. 6:46:17to form and create one powerful
  10229. 6:46:20continuous improvement methodology
  10230. 6:46:23they have various overlapping goals
  10231. 6:46:24toward the improvement with the aim of
  10232. 6:46:27creating the most efficient system
  10233. 6:46:29though the approaches are different the
  10234. 6:46:31methods complement each other
  10235. 6:46:34lean six sigma takes the power and rigor
  10236. 6:46:36of six sigma methodology and combines it
  10237. 6:46:39with lean concepts leading to faster
  10238. 6:46:41results better quality and improved
  10239. 6:46:44customer satisfaction
  10240. 6:46:47let's look at the differences between
  10241. 6:46:48lean and six sigma
  10242. 6:46:50lean focuses on efficiency by
  10243. 6:46:53identifying value from the customer's
  10244. 6:46:55point of view removing unnecessary steps
  10245. 6:46:58in the process and improving process
  10246. 6:47:00speed or velocity
  10247. 6:47:02on the other hand
  10248. 6:47:04six sigma focuses on effectiveness with
  10249. 6:47:06the help of breakthrough processes
  10250. 6:47:09identifying root causes
  10251. 6:47:11and reduction in variation
  10252. 6:47:14therefore when six sigma is combined
  10253. 6:47:16with lean it is possible to achieve
  10254. 6:47:18business transformation
  10255. 6:47:20so remember lean is about speed with a
  10256. 6:47:23focus on efficiency six sigma is about
  10257. 6:47:26quality with a focus on effectiveness
  10258. 6:47:28and lean six sigma brings the best of
  10259. 6:47:30both together
  10260. 6:47:32to yield a better result first implement
  10261. 6:47:35lean to streamline the process
  10262. 6:47:37this helps to understand the chronic
  10263. 6:47:38problems and the ways to handle them
  10264. 6:47:41quickly
  10265. 6:47:42once the problem is identified use six
  10266. 6:47:45sigma methodology to analyze the issues
  10267. 6:47:48and provide business improvement
  10268. 6:47:49transformation
  10269. 6:47:50in other words lean is used to reduce
  10270. 6:47:52the waste and six sigma is used to
  10271. 6:47:55reduce the variation
  10272. 6:47:57thanks to our training experts it was a
  10273. 6:47:58real pleasure having you with us
  10274. 6:48:01and with that we have come to an end of
  10275. 6:48:02this full course video on six sigma i
  10276. 6:48:05hope it was informative and interesting
  10277. 6:48:07if you have any questions related to the
  10278. 6:48:09topics that we covered in this video
  10279. 6:48:11please ask away in the comment section
  10280. 6:48:13below our team of experts will be
  10281. 6:48:14delighted to hear it from you thanks for
  10282. 6:48:16watching stay safe and keep learning
  10283. 6:48:21[Music]
  10284. 6:48:23hi there if you like this video
  10285. 6:48:25subscribe to the simply learn youtube
  10286. 6:48:26channel and click here to watch similar
  10287. 6:48:29videos turn it up and get certified
  10288. 6:48:31click here

About this transcript

This page contains the full transcript of Six Sigma Full Course in 7 Hours | Six Sigma Green Belt Training | Six Sigma Training | Simplilearn by Simplilearn, generated from the public captions YouTube serves with the video. The transcript has 56,888 words across 10,288 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.