  1. 0:00this is NASA headquarters here in
  2. 0:02Washington
  3. 0:03the space agency's administrator Sean
  4. 0:06O'Keefe was on Capitol Hill today
  5. 0:08he testified before a joint House and
  6. 0:10Senate committee hearing about the
  7. 0:12shuttle Columbia investigation
  8. 0:14NASA's budget and the future of manned
  9. 0:17space flight
  10. 0:19the hearing's about four hours we pick
  11. 0:21it up during the opening statement of
  12. 0:23Senate science committee chairman John
  13. 0:25McCain
  14. 0:31in today's hearing we hope to examine
  15. 0:33what went wrong on February 1st the
  16. 0:36status of the investigation
  17. 0:38and how we can ensure that in an
  18. 0:41accident like this
  19. 0:42will never happen again
  20. 0:45this will be the first of a series of
  21. 0:47hearings on NASA and our space program
  22. 0:50while today we're focusing on the
  23. 0:51Columbia the accident also has focused
  24. 0:54our attention on the broader policy
  25. 0:56issues
  26. 0:57that perhaps we have neglected for too
  27. 0:59long
  28. 1:00at subsequent hearings we will address
  29. 1:02the role of man and unmanned space
  30. 1:04exploration the costs and benefits of
  31. 1:07continuing the shuttle program
  32. 1:09and our investment in the International
  33. 1:10Space Station and the effectiveness of
  34. 1:13NASA management
  35. 1:15more fundamentally we must examine the
  36. 1:17goals of our space program
  37. 1:20I firmly believe that manned space
  38. 1:22exploration should continue
  39. 1:25it's nature however should be and will
  40. 1:28be examined
  41. 1:30we also must examine the extent to which
  42. 1:32Congress and the administration may have
  43. 1:34neglected the safe the shuttle safety
  44. 1:36program
  45. 1:37a comprehensive examination necessitates
  46. 1:40a review of our own actions and those of
  47. 1:43the administration determined to
  48. 1:44determine
  49. 1:46if the shuttle program was underfunded
  50. 1:48or managed in a manner that compromised
  51. 1:51safety
  52. 1:53I applaud administrator Sean O'Keefe and
  53. 1:55NASA for their openness and availability
  54. 1:58this has been an extraordinarily trying
  55. 2:00time for everyone in the agency
  56. 2:02the administrator and other officials
  57. 2:04have conducted themselves in a manner
  58. 2:06worthy of an agency that is not only a
  59. 2:09national Brain Trust but is entrusted
  60. 2:12with realizing the dreams of all
  61. 2:13Humanity
  62. 2:15many have noted the vast Improvement of
  63. 2:17the release of information is compared
  64. 2:19to the Challenger tragedy of 1986.
  65. 2:24I'd like to assure the families of the
  66. 2:26brave men and women who died aboard the
  67. 2:28Columbia and the dedicated employees of
  68. 2:30NASA that we will do everything in our
  69. 2:33power to identify the cause of this
  70. 2:35tragedy and remedy it
  71. 2:38I thank administrator O'Keefe and his
  72. 2:41team for appearing before us today and I
  73. 2:43look forward to the testimony
  74. 2:49we usually open hearings by talking
  75. 2:51about what a pleasure it is to be here
  76. 2:54today
  77. 2:55but of course that is not the case
  78. 2:58I'm reminded of what Lyndon Johnson said
  79. 3:00when he appeared before Congress after
  80. 3:03the Kennedy assassination
  81. 3:05he said all I have I gladly would have
  82. 3:08given not to be standing before you
  83. 3:11today
  84. 3:13I'm sure that is the way we all feel
  85. 3:16with a tragic loss of the Columbia crew
  86. 3:19so fresh in our minds and in our hearts
  87. 3:23but we owe it to those astronauts and
  88. 3:25their families and to the American
  89. 3:26public
  90. 3:27to work as hard as humanly possible to
  91. 3:31determine the cause of the shuttle's
  92. 3:33breakup and to rigorously pursue all the
  93. 3:36policy questions
  94. 3:37and the accident brings to a head
  95. 3:40I view this hearing as a start of a very
  96. 3:43long conversation we will all be having
  97. 3:45about the Columbia incident and its
  98. 3:48ramifications
  99. 3:49I think that it's very appropriate that
  100. 3:51we start that conversation on a
  101. 3:54bicameral basis and I want to thank
  102. 3:56Senator McCain for being so willing to
  103. 3:59make this a joint hearing
  104. 4:01the house and the Senate NASA are going
  105. 4:03to have to cooperate as we each review
  106. 4:06the accident and the human space flight
  107. 4:08program
  108. 4:09and our joint work today should send a
  109. 4:13clear signal that we can and will do
  110. 4:16just that
  111. 4:17we will also be coordinating with a
  112. 4:20Columbia accident investigation board
  113. 4:22headed by Admiral Gaiman I've spoken to
  114. 4:25Admiral Gaiman and I am impressed with
  115. 4:27the Admiral's determination to be
  116. 4:30independent and deliberate vowing to be
  117. 4:33swayed neither by outside pressures or
  118. 4:36artificial deadlines
  119. 4:38and I appreciate the swiftness with
  120. 4:39which administrator O'Keefe activated
  121. 4:42the board
  122. 4:44that said The more I've read the board's
  123. 4:46Charter The more I've become convinced
  124. 4:49that it must be Rewritten the words of
  125. 4:52the charter simply do not guarantee the
  126. 4:55independence and latitude that both the
  127. 4:57administrator and the Admiral have
  128. 5:00sincerely promised
  129. 5:02the Charter's words need to match
  130. 5:04everyone's intent now to avoid any
  131. 5:07problems later
  132. 5:08I also continued to believe that several
  133. 5:11more members should be added to the
  134. 5:13board
  135. 5:13to ensure that it has the appropriate
  136. 5:15breadth of experience and expertise
  137. 5:20we will be working closely with the
  138. 5:21board as the science committee proceeds
  139. 5:23with its own bipartisan investigation
  140. 5:26which will focus on the many qualis uh
  141. 5:29policy questions raised by the accident
  142. 5:33we're going to have to raise some tough
  143. 5:34and basic questions that have gone
  144. 5:37unanswered for too long
  145. 5:40what are the true risks of flying the
  146. 5:42shuttle especially if it's going to
  147. 5:44remain in service for another 10 to 15
  148. 5:47years
  149. 5:49what are the true costs of continuing
  150. 5:51the shuttle program at specific levels
  151. 5:54of risk and what are the advantages of
  152. 5:57investing in the shuttle as compared to
  153. 5:59investing in other NASA programs other r
  154. 6:02d programs and indeed other government
  155. 6:05programs in general
  156. 6:08but we can't begin to deal with those
  157. 6:10overarching issues until we have a
  158. 6:12better sense of what happened to the
  159. 6:14Columbia and why and it's obviously too
  160. 6:18soon to expect to know that
  161. 6:20no one should expect any Revelations at
  162. 6:23today's hearing we are here today to get
  163. 6:27a status report
  164. 6:28we ought to avoid pronouncements today
  165. 6:31that we may later come to regret
  166. 6:35I'm reminded of an interview I once read
  167. 6:37with an executive of the utility that
  168. 6:40owned Three Mile Island at the time of
  169. 6:43the accident there
  170. 6:44he was asked what was the worst thing
  171. 6:47you did in handling the accident he
  172. 6:51answered immediately he said we just
  173. 6:53didn't have the presence of mine to say
  174. 6:56I don't know
  175. 6:58I would advise administrator O'Keefe who
  176. 7:01has responded magnificently in this time
  177. 7:04of Crisis don't hesitate to say
  178. 7:07I don't know
  179. 7:09you're still in search of elusive
  180. 7:11answers
  181. 7:13despite the best of intentions NASA has
  182. 7:16at times already put out misleading
  183. 7:18information because it didn't check the
  184. 7:20facts for example information indicating
  185. 7:24that environmental rules could have
  186. 7:27contributed to the accident has so far
  187. 7:29turned out to be entirely spurious
  188. 7:32but it's taken NASA a long time to
  189. 7:34clarify its statements today is a chance
  190. 7:38to put facts into the record facts that
  191. 7:40will help chart NASA's future
  192. 7:43if we are to find the facts and honor
  193. 7:46the memory of the Columbia crew
  194. 7:49we have to approach our task in a true
  195. 7:52Spirit of Exploration with open and
  196. 7:56probing Minds without preconceived
  197. 7:59notions or foregone conclusions
  198. 8:02that should be our goal today thank you
  199. 8:05Mr chairman Senator Hollings
  200. 8:07thank you thank you very much Mr
  201. 8:10chairman for calling this meeting we
  202. 8:12welcome our colleagues from the host
  203. 8:15side and throughout my whole friend
  204. 8:18administrator O'Keefe
  205. 8:20we're glad to have you with us uh
  206. 8:23chairman bullet uh
  207. 8:26I got the message let's don't jump to
  208. 8:28conclusions
  209. 8:30uh on the other hand I'm reading in the
  210. 8:33morning paper
  211. 8:35the similar message not on the other
  212. 8:37hand rather
  213. 8:39Admiral Gaiman said that the
  214. 8:41investigation with solid evidence thus
  215. 8:43far hard to come by
  216. 8:46on the contrary we have a lot of solid
  217. 8:50evidence
  218. 8:52that we've come by and I I sort of
  219. 8:56discern some kind of eerie avoidance
  220. 9:00here of what really happened
  221. 9:03here are the hard evidence NASA's had a
  222. 9:07long history
  223. 9:09of problems with the shuttle heat tiles
  224. 9:12we know that the Columbia's very first
  225. 9:14mission to tiles all flew off that's 22
  226. 9:17years ago
  227. 9:19in 1994 a study entitled a risk
  228. 9:23management for the tiles of the Space
  229. 9:25Shuttle
  230. 9:26by Stanford and Carnegie Mellon
  231. 9:29found that 15 percent of the shuttle's
  232. 9:32tiles account for 85 percent of the risk
  233. 9:37and that was confirmed by a 1997 study
  234. 9:41by the National Academy of Sciences
  235. 9:45then a study by the Johnson Space Center
  236. 9:48itself in March of 2000. found that the
  237. 9:52leading edges of the wing quote pose the
  238. 9:56highest risk for critical
  239. 9:58failure end quote
  240. 10:01and then during the launch
  241. 10:04of the Columbia on January the 16th we
  242. 10:08have video evidence of debris striking
  243. 10:12the shuttle over 81 seconds after launch
  244. 10:17causing a gash in the left wing
  245. 10:21of some 30 inches long seven inches wide
  246. 10:25and over two and a half inches thick
  247. 10:29and then
  248. 10:3118 minutes from Landing
  249. 10:34the shuttle was pitching and yawning due
  250. 10:38to
  251. 10:38drag on the left wing
  252. 10:41and of course the smallest people says
  253. 10:44that
  254. 10:45as it was coming down and I'm quoting
  255. 10:49the mission control
  256. 10:52uh FYI for your information I've just
  257. 10:56lost four separate temperature
  258. 10:59transduces on the left side of the
  259. 11:02vehicle
  260. 11:03hydraulic return temperatures he calmly
  261. 11:07reported
  262. 11:08and then
  263. 11:10uh
  264. 11:1218 minutes
  265. 11:14from The Landing
  266. 11:16the shuttle was pitching and yawning due
  267. 11:19to drag on the left wing
  268. 11:22and then again quoting eight minutes
  269. 11:25before all communication was lost Mr
  270. 11:28Kling notice the loss of data from
  271. 11:33temperature gauges on the left wing on
  272. 11:35the spacecraft as he monitored The
  273. 11:38shuttle's Descent into the atmosphere a
  274. 11:41few moments later Mr Keane reported drag
  275. 11:44on the spaceship
  276. 11:46but control is expressed no alarm
  277. 11:50and uh
  278. 11:52finally the elevons the picture
  279. 11:56showed the elevans tried to cataract
  280. 11:59that Dragon engine thrusters
  281. 12:02to help it gain control because a minute
  282. 12:05before
  283. 12:07the exploding explosion the U.S Air
  284. 12:12Force captured that picture of the
  285. 12:15shuttle showing a bulge of deformity
  286. 12:18along the front edge of the left wing
  287. 12:21uh
  288. 12:23right on down the list
  289. 12:25uh Mr administrator I would think in the
  290. 12:28testimony we'll all agree we don't want
  291. 12:31to jump to conclusions we all agree we
  292. 12:33want to be very thorough and leave no
  293. 12:35stone unturned
  294. 12:37but we do have a rebuttable presumption
  295. 12:40here that the damage at the left's wing
  296. 12:44at the time of liftoff was the cause and
  297. 12:48let's rebutt it let's find something but
  298. 12:50don't all of a sudden be discovering
  299. 12:52debris all around and all of these other
  300. 12:54things that I've been in these
  301. 12:56investigations before and we knew
  302. 13:00exactly what happened
  303. 13:01it's a challenger Alan McDonald
  304. 13:05said he was in the control room that
  305. 13:07want not to take it off it was going to
  306. 13:09cause a catastrophe and he said one
  307. 13:13gentleman said There She Goes another
  308. 13:15one said like a piece of cake and then
  309. 13:18he said it exploded and everyone in the
  310. 13:21room knew why
  311. 13:23and then we spent years investigating to
  312. 13:26find out the same thing that we knew
  313. 13:28immediately at the time of explosion
  314. 13:30thank you Mr chairman
  315. 13:32thank you Senator Hollings uh
  316. 13:34Congressman Hall hasn't arrived yet so
  317. 13:36we will proceed to Mr O'Keefe the
  318. 13:39administrator of the National
  319. 13:40Aeronautics and Space Administration
  320. 13:42he's accompanied by
  321. 13:44Mr Frederick D Gregory who is the Deputy
  322. 13:47Administrator
  323. 13:48and Mr William Reedy the associate
  324. 13:50administrator for space flight if you'd
  325. 13:52like to join uh or either one of Maine
  326. 13:55where they are um
  327. 13:57and again I want to thank you for the
  328. 14:01extreme willingness on your part to
  329. 14:03share
  330. 14:04all information that you have with not
  331. 14:07only members of Congress but with the
  332. 14:09American people please proceed Mr
  333. 14:11O'Keefe and uh
  334. 14:13I hope you understand that we're
  335. 14:15interested in as thorough a briefing as
  336. 14:17possible as our Americans who are
  337. 14:20viewing this hearing today thank you sir
  338. 14:24good morning
  339. 14:25thank you Mr chairman chairman Bullard
  340. 14:29I appreciate the opportunity to appear
  341. 14:30before this hearing of the Senate
  342. 14:32Commerce science and transportation
  343. 14:34committee
  344. 14:35and the house science subcommittee on
  345. 14:38space and Aeronautics to discuss the
  346. 14:39tragic loss of the courageous crew of
  347. 14:42the space shuttle Columbia
  348. 14:44could you an ongoing investigation into
  349. 14:46this tragedy
  350. 14:48and the implications of the loss of
  351. 14:50Colombia to the nation's space
  352. 14:51exploration efforts
  353. 14:54this morning 11 days after the accident
  354. 14:56our work continues to honor the solemn
  355. 14:59pledge we've made to the astronauts
  356. 15:01families
  357. 15:02and to the American people
  358. 15:04they will find out what caused the loss
  359. 15:06of Colombia and its crew correct what
  360. 15:08problems we find and do our utmost to
  361. 15:11make sure this never happens again
  362. 15:15we welcome The Joint committee's
  363. 15:16interest in working with NASA to
  364. 15:18determine how we can learn from this
  365. 15:20tragic accident
  366. 15:21so we continue advancing the nation's
  367. 15:23research and exploration objectives in
  368. 15:25space
  369. 15:27while at the same time striving to
  370. 15:29ensure that we make human space flight
  371. 15:31as safe as possible
  372. 15:34throughout NASA's 45 years of serving
  373. 15:37the public interest
  374. 15:39Congress has been our partner
  375. 15:41helping us achieve the goals outlined in
  376. 15:43NASA's congressionally authorized
  377. 15:45Charter
  378. 15:46this Charter compels NASA to explore use
  379. 15:50and enable the development of space for
  380. 15:52human Enterprise
  381. 15:54Advanced scientific knowledge and
  382. 15:56understanding of the Earth the solar
  383. 15:57system and the universe and use the
  384. 16:00environment of space for research
  385. 16:03research develop verify and transfer
  386. 16:06Advanced Aeronautics Space and related
  387. 16:08Technologies
  388. 16:11with the support of Congress NASA has
  389. 16:13amassed a record of significant
  390. 16:14achievements that have tangibly improved
  391. 16:17the lives of all Americans
  392. 16:20and when we have aired you have helped
  393. 16:22us write our course
  394. 16:25this morning you'll be asking tough
  395. 16:27questions and that's as it should be
  396. 16:30believe me none of the questions that
  397. 16:32you will ask can be any tougher than
  398. 16:35those we're asking of ourselves
  399. 16:38I can assure you however that whatever
  400. 16:40determinations are reached regarding the
  401. 16:42cause of the accident
  402. 16:43you'll find that complacency is not one
  403. 16:46of them
  404. 16:47an ethos of safety is evident throughout
  405. 16:51the agency
  406. 16:52for example last year we temporarily
  407. 16:55halted shuttle flight operations when
  408. 16:57tiny cracks of less than two inches were
  409. 17:00discovered in metal liners used to
  410. 17:03direct the fuel flow inside the
  411. 17:05propellant lines on two separate
  412. 17:07orbiters
  413. 17:08we did not fly again until that problem
  414. 17:11was corrected
  415. 17:13now to Signal our continuing commitment
  416. 17:15to rewarding such diligence we also made
  417. 17:17it a point
  418. 17:18to praise a very young
  419. 17:21examiner fellow named David Strait a
  420. 17:24young contract employee who had actually
  421. 17:25discovered the cracks
  422. 17:28other flight decisions made throughout
  423. 17:29the year were made with the goal of
  424. 17:31operational safety being Paramount
  425. 17:35and from working with the dedicated
  426. 17:36employees who keep the shuttle flying
  427. 17:38safely I know they have the utmost
  428. 17:40regard for the enormity of that Duty
  429. 17:44this week at Nasa centers throughout the
  430. 17:47country and in the field
  431. 17:49with the support of more than two
  432. 17:50thousand people from more than 20
  433. 17:52federal agencies state and local
  434. 17:54organizations
  435. 17:56the important work of data analysis and
  436. 17:58Recovery operations is continuing
  437. 18:01we should all be extremely proud of the
  438. 18:03work that's being conducted by these
  439. 18:05dedicated public servants
  440. 18:08President Bush observed last week
  441. 18:11the people of NASA are being tested once
  442. 18:13again
  443. 18:15in your grief you're responding as your
  444. 18:17friends would have wished with Focus
  445. 18:20professionalism and unbroken faith in
  446. 18:23the mission of this agency
  447. 18:25Captain Brown was correct
  448. 18:27America's Space Program Will Go On
  449. 18:31we intend to maintain that
  450. 18:32professionalism he return referred to
  451. 18:34until we reach conclusion and Beyond
  452. 18:38this morning to help frame our
  453. 18:39discussion I'd like to review for you
  454. 18:41the significant actions NASA has taken
  455. 18:43since the morning of the accident
  456. 18:45in accord with our contingency plan
  457. 18:48in addition to articulating notification
  458. 18:50of First Response procedures defining
  459. 18:53the roles and responsibility of mishap
  460. 18:55response mishap investigation teams
  461. 18:58the plan specifies selections of persons
  462. 19:01outside of NASA to head an independent
  463. 19:04season accident investigation team
  464. 19:09now while we did not foresee this
  465. 19:10tragedy
  466. 19:12our response has unfolded as we had
  467. 19:14planned and prepared for in that
  468. 19:16contingency plan that we had hoped to
  469. 19:18never have to activate
  470. 19:21plan was one of many positive outcomes
  471. 19:23from the terrible loss of the Space
  472. 19:25Shuttle Challenger seven
  473. 19:31updated it before every flight
  474. 19:34and a contingency was simulated for this
  475. 19:37very event just three months ago
  476. 19:43when we first became aware of the
  477. 19:45problems with sts-107 I was waiting at
  478. 19:48the space shuttle landing strip at the
  479. 19:50Kennedy Space Center at Cape Canaveral
  480. 19:52on Saturday morning February the first
  481. 19:56at 8 59 a.m eastern time we lost
  482. 19:59communication with the Columbia
  483. 20:02at 9 16 the countdown arrival clock
  484. 20:05reached zero and there was no signal or
  485. 20:07sign of the Columbia
  486. 20:10Captain Bill Reedy our associate
  487. 20:12administrator for a space flight and a
  488. 20:14former astronaut
  489. 20:15declared a space flight contingency and
  490. 20:18activated the recovery control center at
  491. 20:21the Kennedy Space Center
  492. 20:23at that point Bill Reedy and I Departed
  493. 20:25the landing strip and headed to the
  494. 20:27launch control center
  495. 20:29we arrived at the launch control center
  496. 20:3113 minutes later
  497. 20:33and at 9 29 a.m We activated the
  498. 20:36contingency action plan
  499. 20:38for space flight operations
  500. 20:40through the White House Situation Room
  501. 20:42we notified the president as well as
  502. 20:44other senior staff of the loss of
  503. 20:46communications
  504. 20:48in addition members of Congress and the
  505. 20:50government of Israel were notified
  506. 20:53Homeland Security secretary Tom Ridge
  507. 20:55and the National Security Council were
  508. 20:58also made aware of the situation and
  509. 21:00were present there in the situation room
  510. 21:02that morning
  511. 21:04secretary Ridge then began assessing the
  512. 21:06possibility of this situation was
  513. 21:08terrorism related
  514. 21:10shortly after he made a determination it
  515. 21:12was highly unlikely terrorism was
  516. 21:14involved
  517. 21:17secretary Ridge then announced that the
  518. 21:19Federal Emergency Management agency
  519. 21:21would be the lead Federal Agency for the
  520. 21:23recovery effort on the ground
  521. 21:26meanwhile the family members of the
  522. 21:28Columbia astronauts were escorted from
  523. 21:30The Landing Strip to the astronauts crew
  524. 21:33quarters
  525. 21:34later that morning at about 11 30
  526. 21:38we met with the families at the crew
  527. 21:40Quarters at Kennedy Space Center
  528. 21:42to express our condolences offer any and
  529. 21:45all support we could give
  530. 21:48and assure them that we would offer that
  531. 21:50support
  532. 21:51throughout this entire ordeal and stated
  533. 21:53our commitment to find the cause of the
  534. 21:56accident
  535. 21:57fix the problems we find and continue
  536. 21:59the work that their loved ones had
  537. 22:01started
  538. 22:04data at all the NASA sites and
  539. 22:07contractors were impounded at 10 am
  540. 22:09and the headquarters action team in
  541. 22:11Washington DC was activated with NASA
  542. 22:14personnel
  543. 22:15moving immediately to their Duty
  544. 22:17stations
  545. 22:18by 10 30
  546. 22:20an hour after the contingency plan had
  547. 22:22been activated the mishap response team
  548. 22:24convened to assess the preliminary data
  549. 22:27and focus on the location of the crew
  550. 22:29compartment
  551. 22:30through the rescue coordination Center
  552. 22:32at Langley Air Force Base in Virginia
  553. 22:35the rapid response team was activated
  554. 22:37for deployment to Barksdale Air Force
  555. 22:39Base in Louisiana that day
  556. 22:44the process of initiating the Columbia
  557. 22:46action investigation board began
  558. 22:49about 10 30 a.m on Saturday February 1st
  559. 22:52one hour after the contingency plan was
  560. 22:54activated
  561. 22:56a place to call to the NASA Deputy
  562. 22:58Administrator Fred Gregory again also a
  563. 23:01former astronaut
  564. 23:02who was at NASA headquarters in
  565. 23:04Washington
  566. 23:06Mr Gregory then began calling the
  567. 23:07Columbia accident investigation board
  568. 23:09members which are specified by position
  569. 23:11in the contingency action plan
  570. 23:16at 1 15 that afternoon I made a brief
  571. 23:19televised statement expressing
  572. 23:22our national regrets
  573. 23:24for the tragic accident and inform the
  574. 23:26public about the appointment of the
  575. 23:28Columbia accident investigation board
  576. 23:32the action investigation board was
  577. 23:34formally activated during the NASA
  578. 23:36mishap investigation team teleconference
  579. 23:39which occurred at 5 PM that afternoon
  580. 23:42on Saturday except February the 1st less
  581. 23:45than eight hours after the event
  582. 23:47by 6 PM during a teleconference with the
  583. 23:50White House Situation Room we briefed
  584. 23:52officials from the Department of
  585. 23:53Homeland Security
  586. 23:55the Federal Emergency Management agency
  587. 23:57the Department of Defense
  588. 23:59the FBI and the Federal Aviation
  589. 24:01Administration about the current status
  590. 24:03of the action investigation
  591. 24:07at 6 40 that evening staff members of
  592. 24:10the national Transportation safety board
  593. 24:12departed Washington and traveled to
  594. 24:14Barksdale Air Force Base in Louisiana to
  595. 24:17assist as part of the mishap
  596. 24:18investigation team that day
  597. 24:22they were later made available to the
  598. 24:24Columbia accident investigation board
  599. 24:27on Sunday February the second
  600. 24:30the action investigation board
  601. 24:32chaired by retired United States Navy
  602. 24:34Admiral Hal Gaiman held its first
  603. 24:37meeting at Barksdale Air Force Base in
  604. 24:39Louisiana
  605. 24:40less than 30 hours after the accident
  606. 24:43we also began the practice of twice
  607. 24:45daily briefings at headquarters in
  608. 24:46Washington and at the Johnson Space
  609. 24:48Center in Houston
  610. 24:52membership of the Columbia action
  611. 24:54investigation board consists of persons
  612. 24:56selected for their positions
  613. 24:58in heading civil and military offices
  614. 25:01with responsibility for Aerospace safety
  615. 25:03accident investigations and related
  616. 25:06skills
  617. 25:07many have been Chief investigators on
  618. 25:09major accidents and between them
  619. 25:12the board members had the experience of
  620. 25:14some 50 major investigations to draw
  621. 25:17upon
  622. 25:19quite simply the people who are now on
  623. 25:20the board are some of the best in the
  624. 25:22world at what they do and they were
  625. 25:24activated immediately
  626. 25:27you have our assurance that this
  627. 25:29distinguished board will be able to act
  628. 25:31with genuine Independence
  629. 25:33when the board assembled it was modified
  630. 25:35as Charter to eliminate any reference to
  631. 25:38NASA directing the administration
  632. 25:40of the investigation so those
  633. 25:43for the framework that was contained in
  634. 25:45the contingency plan was modified and
  635. 25:47will continue to be to assure the
  636. 25:49independence of this board
  637. 25:51NASA accepted the changes to the Charter
  638. 25:53without objection as I will continue to
  639. 25:55do in the future as well for any changes
  640. 25:57they propose
  641. 25:59further
  642. 26:00the NASA Inspector General Robert Cobb
  643. 26:04is an observer on the Columbia action
  644. 26:06investigation board having arrived on
  645. 26:08Monday February the 3rd
  646. 26:11he will help assure the independence of
  647. 26:13the board
  648. 26:14as he reports both to the president and
  649. 26:16of the Congress under the terms of the
  650. 26:18Inspector General Act
  651. 26:21there are additional details about the
  652. 26:23Columbia acts investigation board and
  653. 26:24its activities that are I think
  654. 26:26important to note
  655. 26:29the board has taken over hardware and
  656. 26:30software releases of NASA so that we
  657. 26:33cannot alter anything unless the board
  658. 26:35approves
  659. 26:37we've already begun to honor document
  660. 26:39requests from the board as we have all
  661. 26:40along
  662. 26:42and have also supplied additional
  663. 26:44documents to the board which were not
  664. 26:45requested but we believe might be
  665. 26:47helpful in their work as we move along
  666. 26:50and finally the board has instructed
  667. 26:52NASA to conduct a fault tree analysis
  668. 26:55that it intends to independently
  669. 26:57validate to look at all the possible
  670. 26:59causes that could have occurred and to
  671. 27:03examine those in a very methodical way
  672. 27:05which they will then in turn
  673. 27:06independently validate
  674. 27:10on Sunday
  675. 27:12the NASA mishap investigation team was
  676. 27:14on the ground and working with local
  677. 27:16officials in Texas and Louisiana
  678. 27:19the state of Texas activated 800 members
  679. 27:22of the Texas National Guard to assist
  680. 27:25with the retrieval of debris and I'm
  681. 27:27eternally grateful to Governor Rick
  682. 27:29Perry for his immediate response within
  683. 27:31hours of our request
  684. 27:34by Tuesday there were nearly 200 NASA
  685. 27:37and NASA contractor Personnel working
  686. 27:39recovery operations in Texas Louisiana
  687. 27:43Arizona and California
  688. 27:45they were part of the more than 2 000
  689. 27:47people from Federal Emergency Management
  690. 27:49agency the Environmental Protection
  691. 27:51Agency
  692. 27:53the FBI the Department of Defense
  693. 27:55Department of Transportation
  694. 27:58U.S forest Service
  695. 28:00Texas National Guard Louisiana National
  696. 28:02Guard and state and local authorities
  697. 28:04working to locate document and collect
  698. 28:07debris
  699. 28:10by Wednesday the astronauts remains were
  700. 28:13transported to Dover Air Force Base in
  701. 28:15Delaware
  702. 28:16at Dover
  703. 28:18NASA Deputy Administrator Fred Gregory
  704. 28:20and former astronaut
  705. 28:22and a ceremonial Honor Guard were
  706. 28:24present to pay our respect
  707. 28:26to the seven Fallen astronauts
  708. 28:30throughout the week we were able to make
  709. 28:32steady progress in our efforts to
  710. 28:34recover debris from the accident
  711. 28:36we have thus far recovered upwards of 12
  712. 28:39000 elements of debris
  713. 28:42the search effort as you know from our
  714. 28:44press conferences is a large complex and
  715. 28:47ongoing effort with hundreds of square
  716. 28:49miles with challenging weather and
  717. 28:52terrain conditions indeed the graphic
  718. 28:54that's up now is that 500 Mile swath
  719. 28:57from Dallas Fort Worth area to just
  720. 29:00south of Shreveport Louisiana in and
  721. 29:02around the Lufkin Texas area
  722. 29:05we're very grateful that no one was
  723. 29:07injured on the ground as a result of
  724. 29:10flying debris from the accident
  725. 29:12and we're working with our agency
  726. 29:14partners to assure recovery operations
  727. 29:16remain safe as we continue this effort
  728. 29:20throughout the course of this activity
  729. 29:22I've also briefed the president and the
  730. 29:24vice president on a near daily basis
  731. 29:27to advise and apprise them of all the
  732. 29:29progress we're making as well as the
  733. 29:31cooperation of all of the federal
  734. 29:32agencies who have been extremely
  735. 29:34participating in this effort
  736. 29:37the Federal Emergency Management agency
  737. 29:39command post was set up in Lufkin Texas
  738. 29:41on Saturday the 1st of February and has
  739. 29:43been operating non-stop since then
  740. 29:46debris collection activities began at
  741. 29:49Barksdale Air Force Base on Sunday
  742. 29:51February the second
  743. 29:53yesterday we began transporting debris
  744. 29:55on trucks to the Kennedy Space Center
  745. 29:57where they'll be assembled and analyzed
  746. 30:00as part of the comprehensive action
  747. 30:02investigation directed by The Game and
  748. 30:04board
  749. 30:06I visited Texas and Louisiana this past
  750. 30:08Saturday to get my own assessment of the
  751. 30:10operation
  752. 30:11and more importantly to personally Thank
  753. 30:13The Volunteers in addition to all the
  754. 30:15federal state and local public servants
  755. 30:18who've been working so tirelessly to
  756. 30:20support the debris recovery effort
  757. 30:24let me touch briefly on the space
  758. 30:26shuttle Fleet as it is today
  759. 30:29discovery
  760. 30:30is continuing to undergo major
  761. 30:33inspections and upgrades which will be
  762. 30:34completed by April of 2004.
  763. 30:38Atlantis is currently assembled and
  764. 30:40stacked in the vehicle Vehicle Assembly
  765. 30:42Building at the Kennedy Space Center for
  766. 30:45sts-114
  767. 30:47the next mission due to have or plan to
  768. 30:49have been flown
  769. 30:51the Endeavor the third of the orbiters
  770. 30:53is in the Orbiter processing facility
  771. 30:56and being prepared for sts-115 which was
  772. 30:59scheduled a couple of months later
  773. 31:02the next shuttle mission sts-114 was to
  774. 31:05have been to the International Space
  775. 31:07Station in March
  776. 31:09that mission commanded by Colonel Eileen
  777. 31:11Collins United States Air Force and I
  778. 31:14met with her on Friday
  779. 31:15to further advise that the mission is on
  780. 31:18hold until we understand the causes of
  781. 31:20the Columbia accident
  782. 31:22and are able to resolve any issues
  783. 31:24identified
  784. 31:26at this time we don't know how long
  785. 31:28we'll be before we can resume shuttle
  786. 31:29flights
  787. 31:31we'll only know when the Columbia action
  788. 31:33investigation board concludes its work
  789. 31:35and presents its findings
  790. 31:37to all of us
  791. 31:40Colombia was the first Orbiter in the
  792. 31:42shuttle Fleet having flown 28 successful
  793. 31:44missions or just over a quarter of its
  794. 31:47certified life
  795. 31:48of 100 flights
  796. 31:50in February 2001
  797. 31:54a little over a year ago Colombia
  798. 31:56completed a major scheduled 18-month
  799. 31:59overhaul an update of its systems a
  800. 32:02process we call
  801. 32:03Orbiter major modifications
  802. 32:07the sts-107 mission was Columbia's
  803. 32:09second flight following that major
  804. 32:12overhaul
  805. 32:13and a successful servicing mission that
  806. 32:15had been conducted the first one
  807. 32:18was to the Hubble Space Telescope in
  808. 32:20March of 2002. so this was the second
  809. 32:22flight after it had been nearly
  810. 32:24completely rebuilt
  811. 32:26prior to the loss of Colombia and her
  812. 32:28crew the projected shuttle flight rate
  813. 32:30was five per year
  814. 32:31starting in 2004.
  815. 32:34and funding is requested for that flight
  816. 32:36rate in the budget the president just
  817. 32:38submitted last week
  818. 32:40the fight rate will be adjusted as
  819. 32:42needed of course once we determine when
  820. 32:45we can return to flight safely
  821. 32:49crew of the International Space Station
  822. 32:52is of course deeply saddened by the loss
  823. 32:54of Colombia and her crew
  824. 32:56as are all of our partners and people
  825. 32:58around the world
  826. 33:00I spoke with International Space Station
  827. 33:02crew members Ken Bowersox the commander
  828. 33:04United States Navy
  829. 33:06Don Pettit who's our science officer
  830. 33:08aboard and Nikolai bodarin who is a
  831. 33:11cosmonaut engineer
  832. 33:13on Sunday February the second for the
  833. 33:15first time in our discussions
  834. 33:17to inform them of the accident and how
  835. 33:19we're proceeding
  836. 33:20despite the tragedy the crew is
  837. 33:22continuing its busy schedule of work
  838. 33:26the day after the loss of sts-107 our
  839. 33:29Russian Partners conducted a successful
  840. 33:31planned launch
  841. 33:33of an unmanned autonomous progress
  842. 33:36resupply vehicle to the station
  843. 33:39the provisions carried on progress 10p
  844. 33:42should provide the crew sufficient
  845. 33:43supplies to maintain normal operations
  846. 33:45through June 2003 through the summer
  847. 33:50progress resupply flights to the
  848. 33:52International Space Station by our
  849. 33:54Russian Partners will continue as
  850. 33:55scheduled
  851. 33:57the next flight is scheduled for June
  852. 33:592003.
  853. 34:01we're working with rasavia Cosmos the
  854. 34:04Russian Aviation and space agency
  855. 34:06officials
  856. 34:07to determine what we might want to place
  857. 34:09on that flight to make sure we have the
  858. 34:12best use of the space available
  859. 34:15in addition a regularly scheduled soyuz
  860. 34:18crew transport vehicle exchange is
  861. 34:21planned already
  862. 34:22for the launch in April 2003 as it had
  863. 34:25been prior to February 1st
  864. 34:28study teams formed almost immediately
  865. 34:31after the accident to assess the impact
  866. 34:33on International Space Station
  867. 34:36these teams are focused on how we will
  868. 34:38first sustain the station second
  869. 34:40continue to assemble the station as it
  870. 34:43is not yet complete
  871. 34:45and third to maximize the utilization of
  872. 34:48this unique resource research platform
  873. 34:51we have kept our International Space
  874. 34:53Station Partners informed of our
  875. 34:54recovery efforts
  876. 34:56and further we have met with our
  877. 34:58International Partners just last week
  878. 34:59and continue to each day to plan future
  879. 35:03meetings in the weeks ahead to develop
  880. 35:04an International Space Station partner
  881. 35:06plan
  882. 35:09we can maintain a permanent crew on the
  883. 35:11International Space Station as long as
  884. 35:13is necessary
  885. 35:14with support from soyuz and progress
  886. 35:16flights
  887. 35:18the International Space Station is
  888. 35:20stable and has sufficient propellant to
  889. 35:22maintain its orbit for at least a year
  890. 35:25without support from the space shuttle
  891. 35:28but the near-term issue for crew support
  892. 35:30beyond June is water
  893. 35:33the International Space Station cannot
  894. 35:35support a crew of three after June with
  895. 35:37the currently planned support from
  896. 35:39progress
  897. 35:40as a consequence we're discussing with
  898. 35:42our International Partners the
  899. 35:43possibility of changing the April soyuz
  900. 35:46flight from a taxi mission
  901. 35:48to accrue exchange mission
  902. 35:50as well as the feasibility of adding
  903. 35:52progress resupply flights
  904. 35:55but I want to really emphasize that
  905. 35:57there are no decisions made and all
  906. 35:59options are being examined at present
  907. 36:03talk to the Expedition six crew the
  908. 36:06captain Bowersox commands now in orbit
  909. 36:09and they've expressed determination and
  910. 36:10desire to do whatever is necessary to
  911. 36:13continue the research and deal with any
  912. 36:15changes in crew rotation
  913. 36:17schedule that may be necessary
  914. 36:21as we look forward to determining our
  915. 36:22nation's best course of action and
  916. 36:24responding to the Columbia accident
  917. 36:26I'd like to point out that NASA
  918. 36:28developed an integrated space
  919. 36:29Transportation plan
  920. 36:31which was submitted by the president to
  921. 36:33the Congress in November as an amendment
  922. 36:36to the fiscal year 2003 budget so three
  923. 36:39months ago that plan was presented at
  924. 36:42that time
  925. 36:43the integrated space Transportation plan
  926. 36:45can help us address many of the
  927. 36:47near-term issues we're facing
  928. 36:49even though it was developed prior to
  929. 36:51the loss of Colombia
  930. 36:53the plan reflects the tight coupling
  931. 36:55required
  932. 36:56across the space station space shuttle
  933. 36:59and the space launch initiatives
  934. 37:02it is intended to ensure that necessary
  935. 37:04access to the International Space
  936. 37:05Station can be supported for the
  937. 37:07foreseeable future
  938. 37:09it consists of three major program
  939. 37:11elements
  940. 37:12the space shuttle the orbital space
  941. 37:14plane and the Next Generation launch
  942. 37:16technology
  943. 37:19this new plan makes Investments to
  944. 37:21extend shuttle's operational life for
  945. 37:24continued safe operations
  946. 37:25the orbital space plane is designed to
  947. 37:27provide a crew transfer capability as
  948. 37:30early as possible to assure access to
  949. 37:33and from the International Space Station
  950. 37:36and the Next Generation launch
  951. 37:37Technology Program funds Next Generation
  952. 37:39reusable launch vehicle technology
  953. 37:41in areas such as propulsion structures
  954. 37:44and operation
  955. 37:46this initiative will focus on the
  956. 37:48orbital space plane and the Next
  957. 37:50Generation launch technology including
  958. 37:52third generation reusable launch vehicle
  959. 37:55efforts
  960. 37:57you know the 2003 budget amendment that
  961. 38:00the president submitted last November
  962. 38:022002 also proposed adding funds to
  963. 38:05International Space Station Reserves
  964. 38:07to assure that we could successfully
  965. 38:09reach the Milestone of U.S core
  966. 38:11configuration and maintain progress on a
  967. 38:14long lead items for enhanced research
  968. 38:17aboard space station and the continued
  969. 38:19build out of that remarkable research
  970. 38:21laboratory platform
  971. 38:24space flight is a means to an end at
  972. 38:26Nasa that end is research exploration
  973. 38:29Discovery and inspiration
  974. 38:33the crew of sts-107 were engaged in a
  975. 38:35wide array of scientific research that
  976. 38:38could be just conducted nowhere
  977. 38:41else but in space and had significant
  978. 38:44potential benefits for the public
  979. 38:46Columbia's crew took great pride in the
  980. 38:48research aimed at fighting cancer
  981. 38:51improving crop yields developing fire
  982. 38:54suppression techniques building
  983. 38:56earthquake resistant buildings and
  984. 38:59understanding the effects of dust storms
  985. 39:01on weather
  986. 39:03as was recorded by the media
  987. 39:05Columbia had a cargo of human ingenuity
  988. 39:10the crew of International Space Station
  989. 39:11is also conducting research now that
  990. 39:13cannot be conducted anywhere else
  991. 39:16thus far more than 60 experiments
  992. 39:18spanning across such scientific
  993. 39:19disciplines as human physiology genetics
  994. 39:23plant biology Earth observations physics
  995. 39:26and cell biology have been conducted on
  996. 39:29the International Space Station
  997. 39:31from these experiments scientists are
  998. 39:33learning better methods of drug testing
  999. 39:36and about Dynamic models of human
  1000. 39:38diseases
  1001. 39:39the physics of fundamental processes in
  1002. 39:42manufacturing
  1003. 39:43antibiotic synthesis and changes in
  1004. 39:46Earth climate
  1005. 39:47vegetation and crops
  1006. 39:50the International Space Station is the
  1007. 39:52centerpiece initiative of human space
  1008. 39:54flight at NASA
  1009. 39:55our objective in this regard are very
  1010. 39:57clear
  1011. 39:58first we will keep on orbit
  1012. 40:00international space stations Crews safe
  1013. 40:04second we intend to keep the
  1014. 40:05International Space Station continuously
  1015. 40:07occupied
  1016. 40:08in order to assure the reliability of
  1017. 40:10the station itself
  1018. 40:12and third we intend to return to
  1019. 40:14assembly as soon as we're able to return
  1020. 40:16to shuttle Fleet
  1021. 40:18to Safe operations and complete the
  1022. 40:21research goals for ourselves and for our
  1023. 40:23International partners
  1024. 40:26to accomplish these aims we need to
  1025. 40:28create a long-term crew return
  1026. 40:29capability to complement and augment the
  1027. 40:32soyuz vehicles now provided by our
  1028. 40:34Russian partners
  1029. 40:36we intend to build that new return
  1030. 40:38capability to create a new crew transfer
  1031. 40:41system
  1032. 40:42will allow us to rotate Crews on the
  1033. 40:44International Space Station independent
  1034. 40:46from the space shuttle
  1035. 40:49we also firmly believe that extending
  1036. 40:51the operational life of the remaining
  1037. 40:52shuttle Fleet is a good investment
  1038. 40:54because we'll help maximize the science
  1039. 40:56return from the International Space
  1040. 40:58Station
  1041. 41:00we designed our internet integrated
  1042. 41:02space Transportation plan
  1043. 41:04to ensure that we have a coordinated
  1044. 41:06resources to exploit the unique research
  1045. 41:09environment of space and the
  1046. 41:11International Space Station in the near
  1047. 41:13Mid and long term
  1048. 41:17we thought the plan was a good one when
  1049. 41:19we proposed it and we believe it's not
  1050. 41:21only valid today but even more
  1051. 41:22compelling to pursue
  1052. 41:25while we believe that this plan is a
  1053. 41:27good one we will re-examine as necessary
  1054. 41:29in light of the investigative findings
  1055. 41:32of Colombia
  1056. 41:35just over a week ago
  1057. 41:38although it seemed more like a lifetime
  1058. 41:41the president spoke so eloquently and
  1059. 41:44powerfully at the Johnson Space Center
  1060. 41:45memorial service in Houston Texas
  1061. 41:49he said the cause of exploration and
  1062. 41:52Discovery is not an option we choose
  1063. 41:55it is a desire written in the human
  1064. 41:57heart
  1065. 41:58we're all part of a creation which seeks
  1066. 42:01to understand all creation
  1067. 42:04we find the best Among Us
  1068. 42:06send them forth an unmapped darkness and
  1069. 42:09pray they will return
  1070. 42:12they go in peace For All Mankind and all
  1071. 42:14mankind is in their debt
  1072. 42:18the noble purpose is described in the
  1073. 42:20president's words frame all that we do
  1074. 42:23and how we do it
  1075. 42:25these purposes Drive our mission goals
  1076. 42:28which are to understand and protect our
  1077. 42:30home planet
  1078. 42:31to explore the universe and search for
  1079. 42:33life
  1080. 42:34and to inspire the next generation of
  1081. 42:36explorers
  1082. 42:38as only NASA can
  1083. 42:41and even while our non-stop work to
  1084. 42:43recover from this terrible tragedy
  1085. 42:45and to continue safe operations on the
  1086. 42:47International Space Station
  1087. 42:49will be our chief focus in the days and
  1088. 42:51weeks and months ahead
  1089. 42:53the American people should know
  1090. 42:55who will also press ahead with other
  1091. 42:57activities to achieve these important
  1092. 42:59goals
  1093. 43:01this Centennial flight year we are
  1094. 43:03launching the Mars exploration Rovers
  1095. 43:06the Mars Express spacecraft
  1096. 43:08the space infrared telescope facility
  1097. 43:11and a number of earth science spacecraft
  1098. 43:13and instruments as well as continuing
  1099. 43:16our work
  1100. 43:17to help improve Aviation Security on
  1101. 43:19behalf of our homeland defense
  1102. 43:23in these activities and in all that we
  1103. 43:25do at Nasa we strive for unmatched
  1104. 43:27excellence
  1105. 43:29when it comes to human space exploration
  1106. 43:31those margins are razor thin
  1107. 43:34and we know we're graded on an extremely
  1108. 43:36harsh curve
  1109. 43:39for us 96 percent to 99 percent is not
  1110. 43:42an a
  1111. 43:44100 percent is the minimum passing grade
  1112. 43:49despite this harsh truth we know the
  1113. 43:52lesson from this terrible accident is
  1114. 43:54not to turn our backs on exploration
  1115. 43:56because it is hard or risky
  1116. 43:59John's shed once said about the age of
  1117. 44:01ocean exploration
  1118. 44:03ship in Safe Harbor is safe but that is
  1119. 44:06not what ships are built for
  1120. 44:09human history teaches us that an
  1121. 44:12exploration after accidents like this
  1122. 44:14occur
  1123. 44:15we learn from them and further reduce
  1124. 44:17risks although we must honestly Miss
  1125. 44:19admit that risk can never be eliminated
  1126. 44:24President John F Kennedy observed once
  1127. 44:26some 41 years ago speaking of our
  1128. 44:29fledgling space program at that time
  1129. 44:32all great and honorable actions are
  1130. 44:34accompanied with great difficulties and
  1131. 44:37both must be enterprised and overcome
  1132. 44:39with answerable courage
  1133. 44:43immediate task before our agency is
  1134. 44:45clear
  1135. 44:46we'll find the problem that caused the
  1136. 44:48loss of Colombia and its crew will fix
  1137. 44:50it and will return to flight operations
  1138. 44:52that are as safe as humanly possible in
  1139. 44:55pursuit of knowledge
  1140. 44:57we have no preconceptions about what
  1141. 45:01cause the failure or what it will make
  1142. 45:03take to make it so it will never happen
  1143. 45:05again
  1144. 45:06we have an independent action
  1145. 45:07investigation Board of truly outstanding
  1146. 45:10and eminently qualified individuals and
  1147. 45:13they and only they alone will determine
  1148. 45:15the cause of the accident and its remedy
  1149. 45:17no matter where it leads
  1150. 45:20we're ready and willing to support the
  1151. 45:23addition of any experts that Admiral
  1152. 45:24Gaiman deems necessary to the effective
  1153. 45:27conduct of the board's investigations
  1154. 45:31part of my job as administrator is to
  1155. 45:34remind folks that NASA does
  1156. 45:36and what we are capable of doing
  1157. 45:39its responsibility I take very very
  1158. 45:41seriously
  1159. 45:43at the same time I am saddened beyond
  1160. 45:45words
  1161. 45:46for the loss of seven outstanding men
  1162. 45:48and women
  1163. 45:49of sts-107
  1164. 45:52I'm also very proud and humbled by the
  1165. 45:54focus
  1166. 45:55dedication and professionalism of the
  1167. 45:57NASA family
  1168. 45:59and all those throughout the country who
  1169. 46:01are assisting in this
  1170. 46:03challenging recovery effort
  1171. 46:07today February the 12th is also the
  1172. 46:10birthday birthday of President Lincoln
  1173. 46:12and some of his words spoken for an
  1174. 46:14entirely different purpose
  1175. 46:16have come to mind this past week
  1176. 46:20it is rather for us to be here dedicated
  1177. 46:22to the great task remaining before us
  1178. 46:25that from these honored dead we take
  1179. 46:27increased Devotion to that cause
  1180. 46:29for which they gave the last full
  1181. 46:32measure of devotion
  1182. 46:36we have an opportunity here now to learn
  1183. 46:39from this loss and renew the boundless
  1184. 46:40Spirit of exploration present at NASA's
  1185. 46:44beginning
  1186. 46:45we will do this by being accountable to
  1187. 46:47the American people for our failings
  1188. 46:49and we hope
  1189. 46:50credible and compelling in pursuit of
  1190. 46:53research exploration and inspiration for
  1191. 46:56future Generations
  1192. 46:59finally during the 16-day
  1193. 47:03sts-107 mission
  1194. 47:05we had no indication that would suggest
  1195. 47:08a compromise to flight safety
  1196. 47:11the time it has taken me to present this
  1197. 47:13testimony
  1198. 47:14is about the same amount of time but
  1199. 47:16transma is transpired
  1200. 47:18between when Mission Control first
  1201. 47:20noticed anomalies and temperature
  1202. 47:21measurements
  1203. 47:23and the accident
  1204. 47:27I just pause for a few seconds
  1205. 47:29that's the same amount of time that
  1206. 47:30transpired
  1207. 47:32from Mission control's last
  1208. 47:33communication with the crew and our loss
  1209. 47:36of signal with the heroic Columbia
  1210. 47:38astronauts
  1211. 47:41may God bless the crew of sts-107
  1212. 47:46chairman McCain chairman bold thank you
  1213. 47:48all very much for your attention
  1214. 47:50thank you very much Mr administrator the
  1215. 47:52chair recognizes the ranking member of
  1216. 47:55the House science committee the
  1217. 47:56gentleman from Texas Mr Hall
  1218. 47:59thank you Mr chairman and thank you
  1219. 48:01chairman McCain and I thank this group
  1220. 48:03Mr O'Keefe I thank you your deputy and
  1221. 48:07your associate of administrator for
  1222. 48:10space flight and those Valiant people
  1223. 48:12who sit behind you there that contribute
  1224. 48:14so much day in and day out we're
  1225. 48:16grateful to you
  1226. 48:17I and I speak for Bart Garden who is the
  1227. 48:21chairman of the space subcommittee who
  1228. 48:24has the same respect I have for the
  1229. 48:26leadership and this is a day and time
  1230. 48:28when we should be neither Republicans
  1231. 48:30nor Democrats but Americans and I think
  1232. 48:33it's a day and time when we come
  1233. 48:35together and Mr administrator you did a
  1234. 48:38great job that Monday that fateful
  1235. 48:40Monday in Houston thank you for that
  1236. 48:43I uh I think uh certainly this is one of
  1237. 48:47the most painful hearings that I've ever
  1238. 48:48had the duty to try to get prepared for
  1239. 48:51uh it's less than two weeks now since
  1240. 48:54the shuttle broke apart in the sky up
  1241. 48:56over my home and my area in Texas I'm
  1242. 48:59saddened every time I think of these
  1243. 49:01seven Brave astronauts and the
  1244. 49:03grief-stricken families that they left
  1245. 49:05behind I knew three of them very well
  1246. 49:08and the young lady from India who had
  1247. 49:10accomplished so much and came so far
  1248. 49:12came to my district on more than one
  1249. 49:15occasion
  1250. 49:16had a great sense of humor was really
  1251. 49:20great for the program in one of her
  1252. 49:22speeches to one of the classes in Canton
  1253. 49:25and VanZant Texas one of the students
  1254. 49:27said we have a hard time pronouncing
  1255. 49:29your name she said that's all right I
  1256. 49:30have a hard time pronouncing yours she
  1257. 49:33she had a way with with the youngsters
  1258. 49:35and was very helpful
  1259. 49:37uh I know that there are a lot of
  1260. 49:40questions about what went wrong and I'm
  1261. 49:41going to shorten my speech here because
  1262. 49:43we have so many others it really should
  1263. 49:45be heard from and we have questions that
  1264. 49:47we have to ask you there's also been a
  1265. 49:49lot of speculation as to quarter who may
  1266. 49:52be to blame for the accident
  1267. 49:53the reality is that it doesn't appear
  1268. 49:56that anyone yet knows what caused the
  1269. 49:58accident although the NASA administrator
  1270. 50:00may have some information in the
  1271. 50:02progress of the investigation to share
  1272. 50:03with us here today and you've done that
  1273. 50:05and I thank you and I think the
  1274. 50:07questions will be elicit more
  1275. 50:08information will be helpful to us so
  1276. 50:11it's likely to be sometime before we'll
  1277. 50:13be clear on what factors have
  1278. 50:15contributed to the accident it's thus
  1279. 50:17it's important that we have a thorough
  1280. 50:19and I want to stress independent as uh
  1281. 50:22Mr Garden has stressed investigation of
  1282. 50:25the accident so that the American people
  1283. 50:26can be assured that everything's on top
  1284. 50:29of the table and I know that's what
  1285. 50:30everybody in this room wants anything
  1286. 50:32less would be a disservice to the
  1287. 50:34courageous men and women who died on the
  1288. 50:35Columbia
  1289. 50:36our nation is grieving we're we're
  1290. 50:39mournful at this time and the families
  1291. 50:42are in mourning but time lessons and
  1292. 50:46sometimes heals that but that same time
  1293. 50:49is going to bolster the need for an
  1294. 50:51independent investigation and that's
  1295. 50:54what we're looking for and Mr
  1296. 50:55administrator I understand that you've
  1297. 50:57pledged to do that and we thank you for
  1298. 50:59that I think we need to take a very
  1299. 51:01close look at what can be done to
  1300. 51:03improve shuttle crew survivability as a
  1301. 51:07longtime member of this committee I've
  1302. 51:09always had problems cutting the NASA
  1303. 51:12budget because not having the knowledge
  1304. 51:14that you men have not having the
  1305. 51:17exposure of life or death that so many
  1306. 51:19of you have I didn't know how to cut it
  1307. 51:21or how to recommend cutting it without
  1308. 51:23endangering someone so we've had to call
  1309. 51:26on the administrator to do that we had
  1310. 51:28to call on Dan golden to do that he did
  1311. 51:30it and I think did it in a good manner
  1312. 51:32we call on you Mr O'Keefe to give us
  1313. 51:35that same type leadership and we we
  1314. 51:37pledge our support to you as we seek out
  1315. 51:40causation and how to keep it from ever
  1316. 51:42happening again NASA is talking about
  1317. 51:45spending upwards of 9 to 13 billion by
  1318. 51:47its own estimates over the next decade
  1319. 51:49to develop a still to be defined orbital
  1320. 51:52space plane that's long-range planning
  1321. 51:55we have to have that we have to have
  1322. 51:56some short-range decisions I think we
  1323. 51:59need to examine whether some of that
  1324. 52:00money would be better spent on
  1325. 52:01developing crew escape systems for the
  1326. 52:04existing shuttle Fleet and on completing
  1327. 52:07a simple reliable U.S crew rescue
  1328. 52:09vehicle for the International Space
  1329. 52:11Station and doing both of these things
  1330. 52:14as soon as possible with that Mr
  1331. 52:16chairman I'd like unanimous to consent
  1332. 52:18to put my full speech in the record and
  1333. 52:21I yield back the time thank you without
  1334. 52:24objection Senator Stevens has to
  1335. 52:28turn quickly to chair the conference
  1336. 52:31concerning the Omnibus Appropriations
  1337. 52:32bill which all of us eagerly await his
  1338. 52:36results of his work and so he'd like to
  1339. 52:38make a brief statement Senator Steve Mr
  1340. 52:41chairman I thank you and I do have to
  1341. 52:42return that conference I've come because
  1342. 52:44the gentleman that's before you I
  1343. 52:46consider to be one of the closest
  1344. 52:47friends I have in the world
  1345. 52:49I think members should know who he is
  1346. 52:52he came to Washington as a White House
  1347. 52:55fellow
  1348. 52:56he worked for the Department of Navy
  1349. 52:58and then he became a senate employee and
  1350. 53:01became the chief of staff of the defense
  1351. 53:03appropriation subcommittee he went from
  1352. 53:06there to become the Comptroller of the
  1353. 53:08Department of Defense the secretary of
  1354. 53:10the Navy he subsequently became a
  1355. 53:13professor at Syracuse University then a
  1356. 53:15deputy director of The Office of
  1357. 53:17Management budget and is now the
  1358. 53:19administrator of NASA I know of no one
  1359. 53:21who's committed himself to good
  1360. 53:23government and and conducted himself in
  1361. 53:26the finest of our Traditions than Sean
  1362. 53:28O'Keefe he's a man of integrity of
  1363. 53:31complete honesty and openness in all he
  1364. 53:34does I would back him because I know
  1365. 53:37who'd be with he with me with my life
  1366. 53:39and I I urge you to listen to Sean
  1367. 53:41O'Keefe today he'll tell you the truth
  1368. 53:43thank you very much thank you very much
  1369. 53:45thank you Senator Stevens thank you Mr
  1370. 53:48O'Keefe for your presentation
  1371. 53:50look one of the issues that is going to
  1372. 53:52be talked about a lot today by a lot of
  1373. 53:54the members is the issue as the weather
  1374. 53:57the NASA's budget was quote starved cut
  1375. 54:00to the Bone there will be allegations
  1376. 54:03that certain recommendations were made
  1377. 54:05by certain people for example
  1378. 54:07the Aerospace safety advisory panel
  1379. 54:10annual report for 2001 stated quote the
  1380. 54:13current and proposed budget are not
  1381. 54:15sufficient to improve or even maintain
  1382. 54:17the safety risk level of operating the
  1383. 54:20space shuttle
  1384. 54:22we've seen a lot of rhetoric in the
  1385. 54:23media and you have too that they were
  1386. 54:25starved that was not my experience as
  1387. 54:28chairman and ranking member of the
  1388. 54:30Commerce Committee but I think it's very
  1389. 54:32important you take that issue head on
  1390. 54:34and immediately
  1391. 54:38yes sir no I fully agree there's no
  1392. 54:40question this is a
  1393. 54:41concern that we continue to have as well
  1394. 54:44and to assure that all of the uh the
  1395. 54:48facts that are laid out on that
  1396. 54:50particular matter as it pertains to
  1397. 54:52um
  1398. 54:54the the views of the ASAP and the
  1399. 54:57advisory committee as well their reports
  1400. 54:59I think reiterate consistently their
  1401. 55:02view that uh
  1402. 55:04the future concerns about space shuttle
  1403. 55:07operations and safety considerations
  1404. 55:09were the matter they were most
  1405. 55:11focused on and so as a consequence their
  1406. 55:15continued effort that I've seen in the
  1407. 55:16report before us always is that they
  1408. 55:21quote specifically it's important to
  1409. 55:22stress the panel believes the safety has
  1410. 55:25not yet been compromised NASA and its
  1411. 55:28contract contractors maintain excellent
  1412. 55:30safety practices and processes as well
  1413. 55:33as an appropriate level of safety
  1414. 55:34Consciousness this has been contributed
  1415. 55:36to significant flight achievements and
  1416. 55:38the defined requirements for operation
  1417. 55:40operating at an acceptable level of risk
  1418. 55:42are always met so they're concerned
  1419. 55:44we're always presented in the context of
  1420. 55:47future
  1421. 55:48approaches and matter of fact if if we
  1422. 55:50call up a slide number 35
  1423. 55:53that will cover that particular question
  1424. 55:55as well their focus was always on the
  1425. 55:58future operations as well as future
  1426. 55:59efforts that were to be engaged in
  1427. 56:02at the present time in terms of current
  1428. 56:04operations and activities they certified
  1429. 56:06as recently as a year ago they felt that
  1430. 56:08the current operations were
  1431. 56:10concentrated on very specifically to
  1432. 56:13assure flight safety as a primary
  1433. 56:15Paramount objective
  1434. 56:18I think you're going to be confronted
  1435. 56:20with some numbers
  1436. 56:21and uh
  1437. 56:23but in further questioning and I hope
  1438. 56:25you will have
  1439. 56:27responses to that as well
  1440. 56:30at a Commerce Committee September 6 2001
  1441. 56:34hearing on shuttle safety William ready
  1442. 56:37then Deputy associate administrator the
  1443. 56:40office of flight space flight
  1444. 56:41acknowledged the challenges NASA was
  1445. 56:44facing to maintain shuttle safety in
  1446. 56:46light of budgetary constraints but
  1447. 56:48nevertheless stated quote the safety of
  1448. 56:50the Space Shuttle has also been
  1449. 56:52dramatically improved by reducing Risk
  1450. 56:54by more than a factor of five later in
  1451. 56:57his testimony he said quote the space
  1452. 56:59shuttle is the safest most capable and
  1453. 57:01reliable transportation system in the
  1454. 57:03world
  1455. 57:04Mr Bloomberg the former Chief of NASA's
  1456. 57:07Aerospace safety advisory panel
  1457. 57:09testifying before the house science
  1458. 57:11Committee in April 2002 on behalf
  1459. 57:14advisory panel stated that quote in all
  1460. 57:17the years of my involvement I've never
  1461. 57:19been as concerned for space shuttle
  1462. 57:21safety as I am right now the concern is
  1463. 57:24not for the present flight or the next
  1464. 57:25or perhaps the one after that in fact
  1465. 57:27one of the roots of my concern is that
  1466. 57:29nobody will know for sure when the
  1467. 57:30safety margins have been eroded too far
  1468. 57:33all of my instincts however suggest that
  1469. 57:36the current approach is planting the
  1470. 57:38seeds for future
  1471. 57:39danger how how do we reconcile those two
  1472. 57:43statements by two highly regarded
  1473. 57:45individual who are within the
  1474. 57:48bureaucracy of NASA yes sir well just to
  1475. 57:51to clarify the record on that the bill
  1476. 57:53Reedy of course is the associate
  1477. 57:55Ministry for space flight Richard
  1478. 57:57blumberg was a independent external uh
  1479. 58:00member of a chairman of the advisory
  1480. 58:03panel for safety so he was not a
  1481. 58:06full-time NASA employee in that regard
  1482. 58:09he was representing a panel View
  1483. 58:12uh reconciling that is I think if you
  1484. 58:14trace the history just a little bit the
  1485. 58:16the plan that had existed until this
  1486. 58:18past November contemplated uh the
  1487. 58:21retirement of the Space Shuttle Fleet as
  1488. 58:25early as the middle of this decade
  1489. 58:27certainly no later than 2012 so it
  1490. 58:29altered over the course of several years
  1491. 58:31from about 95 forward the best I can
  1492. 58:34tell the history of this
  1493. 58:35based on the the recommendations of that
  1494. 58:38advisory panel on safety as well as uh
  1495. 58:42the the testimony and comments made at
  1496. 58:44several different committee hearings as
  1497. 58:46well
  1498. 58:47we went back and really looked seriously
  1499. 58:49at the question of what it would take in
  1500. 58:51order to maintain shuttle operations for
  1501. 58:53a sustained period of time what kind of
  1502. 58:55continued upgrades would be necessary
  1503. 58:57modifications necessary in order to Sure
  1504. 59:00safe flight operations and on the basis
  1505. 59:02of that as recently as last summer went
  1506. 59:04through that planning effort which
  1507. 59:07ultimately yielded the amendment that
  1508. 59:08was sent forward by the president on
  1509. 59:10November 13th of last year to propose a
  1510. 59:13specific change in the funding profile
  1511. 59:15for shuttle which envisioned a
  1512. 59:17maintenance of that asset for a
  1513. 59:19sustained period of time through next
  1514. 59:20decade so the focus of these concerns
  1515. 59:24which were all exactly as you stated it
  1516. 59:25Mr chairman in the context of future
  1517. 59:27concern were the things we were very
  1518. 59:29mindful of took heat of made adjustments
  1519. 59:32to and specifically put in plan in order
  1520. 59:34to assure that we cover those kinds of
  1521. 59:37uh of concerns in the future and address
  1522. 59:39those as it pertained to current flight
  1523. 59:41operations again there was no indication
  1524. 59:44that I I knew of that raised concerns
  1525. 59:47along the way of current flight
  1526. 59:49operations if anything the diligence I
  1527. 59:52see among the entire folk in the NASA
  1528. 59:54Community is very much that of a culture
  1529. 59:57that's dedicated to assuring safe flight
  1530. 59:59operations or else the launch doesn't
  1531. 1:00:01occur and that is the mindset and Ethos
  1532. 1:00:03we continue to encourage and will
  1533. 1:00:05continue to encourage in the future
  1534. 1:00:09Mr Keefe as I mentioned in my opening
  1535. 1:00:12statement I remain concerned about
  1536. 1:00:14language throughout the charter of the
  1537. 1:00:16Columbia accident investigation board
  1538. 1:00:19the language would appear to indicate
  1539. 1:00:21that everything the board does is
  1540. 1:00:23subject to NASA approval and that to me
  1541. 1:00:26raises some fundamental questions about
  1542. 1:00:28the independence of the board and we all
  1543. 1:00:31want the board to be independent not
  1544. 1:00:34just in name but in fact are you willing
  1545. 1:00:36to re-examine that Charter and remove
  1546. 1:00:39some of the language that raises these
  1547. 1:00:41questions and make adjustments in other
  1548. 1:00:43places yes sir we'll continue to work
  1549. 1:00:45with Admiral Gaiman to assure whatever
  1550. 1:00:48he needs in order to guarantee the
  1551. 1:00:50independence objectivity of that board
  1552. 1:00:52we will absolutely work with without
  1553. 1:00:54objection I mean just just just to give
  1554. 1:00:56you an example uh the independence board
  1555. 1:00:58will conduct activities in accordance
  1556. 1:01:00with the provisions of applicable NASA
  1557. 1:01:03policies and procedures and then it goes
  1558. 1:01:05on to say the interim schedule board
  1559. 1:01:09activities interim board reports and the
  1560. 1:01:11submission of final board report in
  1561. 1:01:13coordination with the NASA administrator
  1562. 1:01:16I would think that they would have
  1563. 1:01:17Independence they could schedule their
  1564. 1:01:19meetings and and determine the type of
  1565. 1:01:22report they want to submit uh of course
  1566. 1:01:24they will submit the report to you but
  1567. 1:01:26the report should come also to the the
  1568. 1:01:29final report not just to the NASA
  1569. 1:01:31administrator but to the president to
  1570. 1:01:33Congress and the American people so I
  1571. 1:01:35think that Charter has to be Revisited
  1572. 1:01:38and and very promptly we've already had
  1573. 1:01:40conversations with each other and I have
  1574. 1:01:42had with Admiral Gaiman and uh both have
  1575. 1:01:45assured me that additional members from
  1576. 1:01:48outside the community so to speak uh
  1577. 1:01:51eminent experts in different fields will
  1578. 1:01:53be added to the board I think that's
  1579. 1:01:55very important it's essential that we
  1580. 1:01:57maintain the independent nature of the
  1581. 1:02:00board a fully concurrent Mr chairman and
  1582. 1:02:02matter of fact I think in Admiral
  1583. 1:02:03gaiman's press conference yesterday he
  1584. 1:02:05was very explicit that all of the
  1585. 1:02:08factors he needed in order to maintain
  1586. 1:02:10Independence and to be an objective
  1587. 1:02:12investigator in this particular case for
  1588. 1:02:14all of his board members was what the
  1589. 1:02:17present condition required having said
  1590. 1:02:18that if for on examination the latest
  1591. 1:02:21change that was made to the Charter at
  1592. 1:02:23his request we made it if he wants
  1593. 1:02:25further changes they'll be made as well
  1594. 1:02:26anything that it takes in order to
  1595. 1:02:28guarantee their independence because we
  1596. 1:02:30will be guided by their findings and as
  1597. 1:02:32I've reiterated publicly as well as to
  1598. 1:02:35you sir and to him that about the only
  1599. 1:02:38thing that will be unique about the
  1600. 1:02:40reporting requirement is that he'll be
  1601. 1:02:42putting an address that says NASA on it
  1602. 1:02:44on the envelope sending it to us but
  1603. 1:02:47that report will be made public
  1604. 1:02:48concurrent with its receipt so he will
  1605. 1:02:51be reporting to the president to the
  1606. 1:02:52Congress to the American people to all
  1607. 1:02:54of us simultaneously
  1608. 1:02:56well I was comforted by my conversation
  1609. 1:02:58with Admiral Gaiman because he is
  1610. 1:03:00insisting on Independence and he's also
  1611. 1:03:03indicated obviously you'll have to have
  1612. 1:03:05a liaison with NASA and use some of your
  1613. 1:03:07resources but the Staffing will be
  1614. 1:03:09independent of NASA and I think that's
  1615. 1:03:11essential
  1616. 1:03:13obviously we're all going to be spending
  1617. 1:03:15a lot of time looking at shuttle
  1618. 1:03:17contracts excuse me even though there's
  1619. 1:03:20no indication at this point that they
  1620. 1:03:22are a problem
  1621. 1:03:23how comfortable are you that the
  1622. 1:03:25incentives in the current contracts
  1623. 1:03:27captured the proper balance between
  1624. 1:03:30efficiency and safety and then as a
  1625. 1:03:33follow-on do the contracts have Clauses
  1626. 1:03:36that will ensure that the contractors
  1627. 1:03:38have to must cooperate fully with the
  1628. 1:03:42game and investigation
  1629. 1:03:44yes sir on the first part um
  1630. 1:03:47the the emphasis on safety in the
  1631. 1:03:50current space operations
  1632. 1:03:52space flight operations contract that we
  1633. 1:03:54have very much emphasizes the uh the
  1634. 1:03:57safety parameters and indeed they have
  1635. 1:04:00tremendous incentives
  1636. 1:04:02to do better each and every time
  1637. 1:04:04and as a consequence of that there are a
  1638. 1:04:07series of weighted factors in the
  1639. 1:04:09guidelines that heavily look at the
  1640. 1:04:11metrics of
  1641. 1:04:13um any any difficulties or problems uh
  1642. 1:04:16on orbit or at launch or any other time
  1643. 1:04:18as they drive those factors down those
  1644. 1:04:21they're given a specific incentive to do
  1645. 1:04:23better in each of those cases so they've
  1646. 1:04:24got a powerful motivation to want to
  1647. 1:04:26move in that direction in doing so I
  1648. 1:04:29think the approach also yields some
  1649. 1:04:31efficiencies but that's a secondary
  1650. 1:04:33manner at at most and so as a result
  1651. 1:04:36there are real advantages and real
  1652. 1:04:38emphasis on the safety considerations
  1653. 1:04:40that are currently built into that
  1654. 1:04:41contract framework as it pertains to
  1655. 1:04:43their cooperation with the game and
  1656. 1:04:45board positively we will advise them and
  1657. 1:04:48have that we fully expect everyone to be
  1658. 1:04:50cooperative with that board we have
  1659. 1:04:52absolutely nothing to hide there is no
  1660. 1:04:54evidence or no fact that we can think of
  1661. 1:04:56out there short of national security
  1662. 1:04:58information or some private proprietary
  1663. 1:05:01issue that some individual may want to
  1664. 1:05:03assert it would preclude us from making
  1665. 1:05:04any information available and so
  1666. 1:05:06everyone within the contractor Community
  1667. 1:05:08should feel the same as as we do but is
  1668. 1:05:10there something more than a moral
  1669. 1:05:11obligation or a desire is there
  1670. 1:05:14something that binds them commits them
  1671. 1:05:17to cooperate fully with a game and
  1672. 1:05:19investigation board
  1673. 1:05:20um I will take you up on your your
  1674. 1:05:21opening statement that on that contract
  1675. 1:05:23clause I don't know but I'll find out
  1676. 1:05:25thank you very much Senator Hollings
  1677. 1:05:33right to the point with respect to cost
  1678. 1:05:36and I'm sure you don't have Mr O'Keefe
  1679. 1:05:38the actual figures with you
  1680. 1:05:41but uh on the show changing of the space
  1681. 1:05:45program we had a report on yesterday
  1682. 1:05:48and the New York Times stating that we'd
  1683. 1:05:50cut the Space Program 800 million I've
  1684. 1:05:54been checking it overnight
  1685. 1:05:55my check is 700 million be that as it
  1686. 1:05:59may what's the truth that's what we want
  1687. 1:06:01I asked on last week Mitch Daniel of the
  1688. 1:06:04OMB Office of Management and budget
  1689. 1:06:07to furnish the budget committee the
  1690. 1:06:11figures of what was requested by NASA I
  1691. 1:06:16want you to furnish the figures that uh
  1692. 1:06:19request by the national requested of OMB
  1693. 1:06:22for the last 10 years not just this
  1694. 1:06:25Administration the past administrations
  1695. 1:06:27to see the train
  1696. 1:06:29line there of just exactly how we
  1697. 1:06:32financed otherwise yes we all are trying
  1698. 1:06:36to find out the cause but in the
  1699. 1:06:38meantime as you try to piece together
  1700. 1:06:40the retrieved parts and everything else
  1701. 1:06:43like that I don't know how long that'll
  1702. 1:06:44take a year and months whatever it is we
  1703. 1:06:48all want to see the space program
  1704. 1:06:50continue
  1705. 1:06:51and for this Senator I don't want it to
  1706. 1:06:54continue with uh upgrades I've heard
  1707. 1:06:58enough about these upgrades we've lost
  1708. 1:07:0114 astronauts and 5 billion dollars in
  1709. 1:07:06Hardware
  1710. 1:07:06with upgrades
  1711. 1:07:09and we had a new
  1712. 1:07:13reusable launch vehicle
  1713. 1:07:17we had a spaceship that was canceled a
  1714. 1:07:21year before last
  1715. 1:07:22and then we had a reusable launch
  1716. 1:07:25vehicle
  1717. 1:07:26and that was canceled
  1718. 1:07:29last November just a couple of months
  1719. 1:07:31ago and you said we're going to use
  1720. 1:07:33these
  1721. 1:07:35vehicles uh shuttles until 2020 you
  1722. 1:07:39would use
  1723. 1:07:41being responsible for safety you would
  1724. 1:07:43try to use one of these shuttles but all
  1725. 1:07:46of these uh tiles flying off and
  1726. 1:07:49everything else and after all of these
  1727. 1:07:51losses you'd still want to use them till
  1728. 1:07:542020 and not get new technology Mr
  1729. 1:07:57administrator yes sir no thank you the
  1730. 1:08:00as I understand the history here the the
  1731. 1:08:02effort during the course of the 90s was
  1732. 1:08:06in anticipation of a retirement of
  1733. 1:08:08shuttle concurrent with the introduction
  1734. 1:08:11of a new
  1735. 1:08:13reusable launch vehicle that was
  1736. 1:08:15envisioned to be the x-33 as I
  1737. 1:08:17understand it
  1738. 1:08:18based on a variety of technical issues
  1739. 1:08:21which were based on the assumption that
  1740. 1:08:24a series of incomparable engineering and
  1741. 1:08:28laws of physics challenges would be
  1742. 1:08:29overcome ultimately that I think two
  1743. 1:08:33plus years ago that the choice was made
  1744. 1:08:36to cancel that program and to continue
  1745. 1:08:38with shuttle operations
  1746. 1:08:40uh what we proposed a year ago and is
  1747. 1:08:43not a cancellation of any rlv effort
  1748. 1:08:45reusable launch vehicle instead it's a
  1749. 1:08:47it's a selection if you will of looking
  1750. 1:08:50at uh the integrates-based
  1751. 1:08:52transportation plan what's included in
  1752. 1:08:54the November amendment that the
  1753. 1:08:55president sent forward for the 2003
  1754. 1:08:57budget is a selection specifically of an
  1755. 1:09:00orbital space plane option which frankly
  1756. 1:09:02is is not a technology leap it is the
  1757. 1:09:05capability of putting a board a
  1758. 1:09:08Expendable launch vehicle a uh orbital
  1759. 1:09:11space system space plane that will be
  1760. 1:09:15launched in a conventional manner using
  1761. 1:09:17an expandable launch vehicle the Next
  1762. 1:09:19Generation beyond that is what we focus
  1763. 1:09:21on our next Generation launch
  1764. 1:09:23Technologies so we've tried to narrow
  1765. 1:09:25and focus a lot more the space launch
  1766. 1:09:27initiative efforts in order to get some
  1767. 1:09:30near-term gain to supplement to
  1768. 1:09:32complement the space shuttle and to
  1769. 1:09:34provide that dynamic as well as flexible
  1770. 1:09:37return system and transfer system to the
  1771. 1:09:40International Space Station and also to
  1772. 1:09:42pursue the development of a reusable
  1773. 1:09:45launch vehicle that may be hopefully
  1774. 1:09:47the product of breakthroughs that were
  1775. 1:09:50not possible that we that forced the
  1776. 1:09:52motivation of the cancellation a few
  1777. 1:09:54years ago of the x-33 so we're trying to
  1778. 1:09:57do both those concurrently but to get
  1779. 1:09:58some near-term capability and in the
  1780. 1:10:00meantime use shuttle
  1781. 1:10:02in the future as a cargo lift heavy lift
  1782. 1:10:05capacity which is what it was really
  1783. 1:10:07designed to do in the first place rather
  1784. 1:10:09than a crew transfer capability so we're
  1785. 1:10:11trying to balance both ends of that to
  1786. 1:10:13utilize capabilities for their best
  1787. 1:10:15purposes as we move along we've got to
  1788. 1:10:17find out what you think we all
  1789. 1:10:19appropriate we all want to continue
  1790. 1:10:21space exploration but we just don't want
  1791. 1:10:24to waste time waiting on the results on
  1792. 1:10:27the one hand on trying to find out what
  1793. 1:10:29we already know uh let's get on and get
  1794. 1:10:33your best advice on how we should
  1795. 1:10:36proceed to get going on this thing and
  1796. 1:10:38not just with upgrade yes sir thank you
  1797. 1:10:41very much Senator Mr Hall
  1798. 1:10:44Mr O'Keefe you heard my opening
  1799. 1:10:46statement and I'm quite frankly
  1800. 1:10:48disappointed that 17 years after the
  1801. 1:10:51Challenger accident so little attention
  1802. 1:10:53has been given to developing crew escape
  1803. 1:10:56systems for our astronauts whether
  1804. 1:10:57they're flying on the shuttle or whether
  1805. 1:10:59they're in the space station I know you
  1806. 1:11:01share that I I share with you the
  1807. 1:11:04disappointment and the blame I've been
  1808. 1:11:06here 23 years so it's a partnership
  1809. 1:11:09thrust and and that's what it is that's
  1810. 1:11:11what it'll continue to be but especially
  1811. 1:11:13since NASA has indicated that the
  1812. 1:11:15shuttle is going to fly for another
  1813. 1:11:16decade and a half and maybe probably
  1814. 1:11:19longer than that
  1815. 1:11:20and in light of a media report I think
  1816. 1:11:24on February the 5th that NASA's most
  1817. 1:11:27recent effort in that regard was a five
  1818. 1:11:29million dollar so-called study in 2001
  1819. 1:11:32to put that study in context the amount
  1820. 1:11:35expended on that study of potential
  1821. 1:11:37shuttle crew escape systems amounted
  1822. 1:11:40just a little bit more than one tenth of
  1823. 1:11:42one percent of a single Year's budget
  1824. 1:11:45that doesn't strike me as being very
  1825. 1:11:48aggressive in in your effort to look for
  1826. 1:11:50ways to improve the odds of survival for
  1827. 1:11:52astronauts in the event of a shuttle
  1828. 1:11:53accident that leads me to say that I
  1829. 1:11:56have no doubt it's going to be
  1830. 1:11:57challenging to develop a practical crew
  1831. 1:12:00escape systems for the shuttle but
  1832. 1:12:02NASA's in the business of of Performing
  1833. 1:12:04Miracles NASA is in the business of
  1834. 1:12:07meeting challenges and we call on you to
  1835. 1:12:09do that I'm I'm very afraid that a clue
  1836. 1:12:12as to why NASA is not doing more is
  1837. 1:12:14found elsewhere in that article namely
  1838. 1:12:16and I quote the proposed fixes were also
  1839. 1:12:19seen as prohibitively expensive
  1840. 1:12:21additions to an already aging and
  1841. 1:12:23financially strapped shuttle Fleet we've
  1842. 1:12:27seen a similar situation with regard to
  1843. 1:12:29the developing a crew rescue vehicle for
  1844. 1:12:31the International Space Station so as
  1845. 1:12:34you know NASA divided decided to cancel
  1846. 1:12:37the ongoing development of U.S crew
  1847. 1:12:39rescue vehicles just as a demonstration
  1848. 1:12:42vehicle we thought was a red it's
  1849. 1:12:44nearing its flight test and now we're
  1850. 1:12:47dependent on the Russians for their crew
  1851. 1:12:49rescue vehicles until the end of this
  1852. 1:12:51decade so in the meantime I guess my
  1853. 1:12:53question to you is did you explicitly
  1854. 1:12:56consider investing in the development of
  1855. 1:12:58space shuttle
  1856. 1:13:00crew escape systems when you revised
  1857. 1:13:03integrated space Transportation plan
  1858. 1:13:05that you announced last November yes sir
  1859. 1:13:08um the we're continuing to look at what
  1860. 1:13:11we would
  1861. 1:13:12use as enhancements if you will of the
  1862. 1:13:15Space Shuttle as part of that November
  1863. 1:13:17amendment that was submitted last
  1864. 1:13:18November and we're getting together here
  1865. 1:13:21had planned to all along to identify
  1866. 1:13:24that priority set of what will emphasize
  1867. 1:13:26the highest safety uh margin
  1868. 1:13:29improvements that could be yielded from
  1869. 1:13:31different modification to the Orbiter
  1870. 1:13:33system
  1871. 1:13:33but with regard to the specific crew
  1872. 1:13:36escape efforts recall that since
  1873. 1:13:38Challenger there have been a number of
  1874. 1:13:40operational changes made there's a an
  1875. 1:13:43egress system that was put into place
  1876. 1:13:45right after the challenge or accident
  1877. 1:13:47that was part of the Rogers commission
  1878. 1:13:49commission recommendations that
  1879. 1:13:51ultimately stem from it I should say
  1880. 1:13:52that we put in a place that now still
  1881. 1:13:55exists to this day once launched though
  1882. 1:13:57there is a number of different
  1883. 1:14:00approaches that have been proposed
  1884. 1:14:02examined reviewed and all of which added
  1885. 1:14:05significant amounts of weight I'm
  1886. 1:14:07advised to the the overall effort and so
  1887. 1:14:10as a consequence reviewed to be
  1888. 1:14:12technically infeasible what we have
  1889. 1:14:14instituted though uh is again a series
  1890. 1:14:16of abort procedures and as recently as
  1891. 1:14:19the December launch of the sts-113 on a
  1892. 1:14:24perfectly clear night at Cape Canaveral
  1893. 1:14:26in Florida where everything was nominal
  1894. 1:14:28everything was ready to go all the
  1895. 1:14:30systems were completely operational we
  1896. 1:14:33scrubbed the launch because the
  1897. 1:14:36alternate abort site at Zaragoza Spain
  1898. 1:14:40the weather was continued to be marginal
  1899. 1:14:43so we take every precaution in this
  1900. 1:14:45process in order to assure that all the
  1901. 1:14:47way through Ascent that every possible
  1902. 1:14:50opportunity is there as much as possible
  1903. 1:14:52but again the idea of a an escape system
  1904. 1:14:55was looked at examined very thoroughly
  1905. 1:14:58and the conclusion was that the weight
  1906. 1:15:00actor would almost be prohibitive in
  1907. 1:15:02terms of its technical clarification so
  1908. 1:15:04we'll continue to look at that we'll go
  1909. 1:15:06back and look at it again you bet in
  1910. 1:15:07light of this circumstance we really do
  1911. 1:15:10need to focus entirely on what the all
  1912. 1:15:12the alternatives are and I guarantee you
  1913. 1:15:14sir we'll make that part of our effort
  1914. 1:15:16underway now as part of this November
  1915. 1:15:19amendment that is before the Congress to
  1916. 1:15:21consider for the 2003 program that will
  1917. 1:15:24factor that into the equation and
  1918. 1:15:25proceed as appropriate even on a local
  1919. 1:15:28level the city councils rarely ever fix
  1920. 1:15:30a bad Bridge or a bad turn in the road
  1921. 1:15:32until a teenager gets killed and then
  1922. 1:15:34it's too late uh it seems to me that we
  1923. 1:15:37launched
  1924. 1:15:38the vehicles without any ability to dock
  1925. 1:15:42we lost the vehicle because we didn't
  1926. 1:15:45have telescopic ability to inspect we
  1927. 1:15:48have three birds left I just urge
  1928. 1:15:50caution and I thank you for your time
  1929. 1:15:52yield back my time appreciate it very
  1930. 1:15:54much Senator Brownback
  1931. 1:15:57thank you very much Mr chairman and um
  1932. 1:15:59Mr O'Keefe thank you very much for
  1933. 1:16:01coming in front of our joint committees
  1934. 1:16:03here and your your great leadership of
  1935. 1:16:05NASA and a really difficult and trying
  1936. 1:16:07and challenging time we all agree the
  1937. 1:16:10lost human life it's uh it's happened to
  1938. 1:16:14NASA and at this particular point I'm
  1939. 1:16:16chairing the subcommittee in the Senate
  1940. 1:16:18that will be dealing with this and I
  1941. 1:16:19want to work with you and your agency As
  1942. 1:16:21We Lay out the future of manned space
  1943. 1:16:22flight in the United States
  1944. 1:16:24I want to ask you about the broad
  1945. 1:16:27objectives and the broad program
  1946. 1:16:29objectives that we're on and about right
  1947. 1:16:31now
  1948. 1:16:32it seems to me that the space program
  1949. 1:16:34has really had a critical juncture and
  1950. 1:16:36the totality of the space program is and
  1951. 1:16:39it's got to decide amongst a couple of
  1952. 1:16:41competing options
  1953. 1:16:42uh one is to maintain the current set of
  1954. 1:16:45programs and current missions
  1955. 1:16:47the second one that you read a lot about
  1956. 1:16:49in the newspaper and people speculating
  1957. 1:16:51this to dramatically reduce a manned
  1958. 1:16:54space flight going to more Robotics and
  1959. 1:16:56different types of vehicles uh
  1960. 1:16:59questioning about the the safety and to
  1961. 1:17:02try to be more safe and a third the
  1962. 1:17:04number of people are saying that our
  1963. 1:17:05vision is too small in space currently
  1964. 1:17:08right now that we need new initiatives
  1965. 1:17:10we need to go back to the Moon we need
  1966. 1:17:12to go to Mars
  1967. 1:17:13and we're at this tremendous fork in the
  1968. 1:17:15road decision of which path to uh to
  1969. 1:17:18take
  1970. 1:17:19it's certainly my intent in the
  1971. 1:17:21subcommittee to look closely at where
  1972. 1:17:23NASA has been and where you are today
  1973. 1:17:24and and where we plan to go into the
  1974. 1:17:27future
  1975. 1:17:28and most importantly we need to discuss
  1976. 1:17:29as well the financial situation the
  1977. 1:17:32terms of how we get NASA where it needs
  1978. 1:17:34to be glad to see the Appropriations
  1979. 1:17:37Committee we're putting in an additional
  1980. 1:17:38414 million over the president's request
  1981. 1:17:44um the goal is to reflect an accurate
  1982. 1:17:46and effective determination for the
  1983. 1:17:48future of NASA and I would simply like
  1984. 1:17:50to ask you what have you done recently
  1985. 1:17:53and I realize you're dealing with a
  1986. 1:17:56tragedy mostly now but to look at this
  1987. 1:17:58need for a review of the mission of NASA
  1988. 1:18:02amongst these three policy objectives
  1989. 1:18:04have you had a chance to start
  1990. 1:18:06contemplating some of that
  1991. 1:18:08and I I hope you'll be open to working
  1992. 1:18:11uh openly with the Congress as we look
  1993. 1:18:14at this fork in the road we're in right
  1994. 1:18:17now sure core Senator I'd be delighted
  1995. 1:18:19to work with you and any other members
  1996. 1:18:21of Congress to to sort through really
  1997. 1:18:23what is the proper role and objective of
  1998. 1:18:25NASA and our pursuit of exploration
  1999. 1:18:27objectives always
  2000. 1:18:30we have indeed had an opportunity prior
  2001. 1:18:32to February 1st to really think
  2002. 1:18:34seriously about what is the strategy and
  2003. 1:18:36the focus
  2004. 1:18:37of how we concentrate on what we do best
  2005. 1:18:42and do that only in a way that
  2006. 1:18:45guarantees and assures that what we
  2007. 1:18:49to offer to folks that we can actually
  2008. 1:18:50deliver on and have a capability to to
  2009. 1:18:54look at longer term exploration
  2010. 1:18:56objectives and I think that's contained
  2011. 1:18:57in the strategic planning documents that
  2012. 1:19:00were all forwarded along with the the
  2013. 1:19:01budget that was submitted by the
  2014. 1:19:04president just last Monday uh prior to
  2015. 1:19:07that in all the efforts we put into it
  2016. 1:19:08was to think seriously about the very
  2017. 1:19:10kind of questions you've raised and
  2018. 1:19:12again to narrowly focus on the kinds of
  2019. 1:19:14exploration and Discovery objectives we
  2020. 1:19:17think we do exceptionally well and for
  2021. 1:19:19those that are done by others or can be
  2022. 1:19:21pursued elsewhere to leave that to uh to
  2023. 1:19:24folks who have expertise or capabilities
  2024. 1:19:26that would otherwise have to be
  2025. 1:19:28duplicated by us what it leads to I
  2026. 1:19:30think is a is a stepping stone approach
  2027. 1:19:32a an exploration uh strategy if you will
  2028. 1:19:36that assumes that we start off with a
  2029. 1:19:39series of robotic capabilities and moves
  2030. 1:19:42forward than thereafter towards other
  2031. 1:19:44exploration objectives that may or may
  2032. 1:19:47not involve human involvement the best
  2033. 1:19:50example that we've seen played before us
  2034. 1:19:52in the last several years is the Hubble
  2035. 1:19:55Space Telescope there was a a two
  2036. 1:19:58billion dollar capability that when
  2037. 1:20:00launched in 1992 in Fairly short order
  2038. 1:20:03was deemed to be as a marvelous out of
  2039. 1:20:05capacity a capability that was in need
  2040. 1:20:10of an eye examination if you will a lens
  2041. 1:20:12correction and it was at that time
  2042. 1:20:15determined to be a two billion dollar
  2043. 1:20:16piece of space junk
  2044. 1:20:18a year later we were able to to send a
  2045. 1:20:23shuttle flight with astronomers and
  2046. 1:20:26other engineering capabilities that was
  2047. 1:20:28resident among the astronauts there to
  2048. 1:20:30make that correction that could not have
  2049. 1:20:32been done remotely and so the human
  2050. 1:20:34intervention that was necessary to
  2051. 1:20:36adjust that and all the servicing
  2052. 1:20:39missions we've done since that time have
  2053. 1:20:41yielded the kind of astronomy
  2054. 1:20:43breakthroughs and Discovery just in this
  2055. 1:20:45past year that we never dreamed
  2056. 1:20:47imaginable so that combination that heel
  2057. 1:20:50toe kind of approach towards of a
  2058. 1:20:52strategy that utilizes robotic
  2059. 1:20:54capabilities much like we're going to do
  2060. 1:20:56here in the coming months when we send
  2061. 1:20:58the Mars explorers in May and June of
  2062. 1:21:01this year intended for landing in
  2063. 1:21:03January of 04 is to then consider all
  2064. 1:21:06the efforts we've got to do to prepare
  2065. 1:21:09for them the follow-on kinds of
  2066. 1:21:10expiration objectives but again the
  2067. 1:21:13reiteration of the the first commitment
  2068. 1:21:16to you positively will continue to work
  2069. 1:21:18together and refine this strategy to
  2070. 1:21:20assure that we do it with least risk but
  2071. 1:21:22its greatest opportunity for exploration
  2072. 1:21:24and Discovery potential thank you and I
  2073. 1:21:26look forward to working with you on that
  2074. 1:21:28design of where gentleman's time has
  2075. 1:21:30expired thank you senator
  2076. 1:21:33Mr rohrbacher
  2077. 1:21:35thank you very much uh first and
  2078. 1:21:38foremost I'd like to identify myself
  2079. 1:21:40with the remarks and the concerns
  2080. 1:21:45all right can you hear me now
  2081. 1:21:48first and foremost I'd like to associate
  2082. 1:21:50myself with the remarks and the concerns
  2083. 1:21:52of uh chairman Bullard about the basic
  2084. 1:21:56nature and the importance of the
  2085. 1:21:59Integrity of of this commission's
  2086. 1:22:01investigation and or and our oversight
  2087. 1:22:04of that commission's work
  2088. 1:22:06uh second of all I would like to just
  2089. 1:22:09note that at the memorial service
  2090. 1:22:11down in Texas I was touched particularly
  2091. 1:22:15by the people of Texas and especially by
  2092. 1:22:18the children of Texas
  2093. 1:22:20who as we went to this memorial service
  2094. 1:22:22they came out on the streets and Roads
  2095. 1:22:25and waved Little American flags and had
  2096. 1:22:27little signs up to encourage us and to
  2097. 1:22:30encourage and it was very encouraging
  2098. 1:22:32for our country so we recognized that
  2099. 1:22:34there was a special bond
  2100. 1:22:37between the Children of America
  2101. 1:22:39and our astronauts and uh today we're
  2102. 1:22:43building and we're going to make sure
  2103. 1:22:44that we build a better future for our
  2104. 1:22:46children and if there's going to be a
  2105. 1:22:48better future for our children we've got
  2106. 1:22:49to have a viable space program that will
  2107. 1:22:53keep them in the Forefront of this great
  2108. 1:22:56human endeavor of going into space and
  2109. 1:22:59pioneering space
  2110. 1:23:01so let me just have a few thoughts and
  2111. 1:23:04then I'll have a few questions for you
  2112. 1:23:06uh the hard-working and patriotic people
  2113. 1:23:10of NASA have always understood and
  2114. 1:23:13appreciated the risks with with space
  2115. 1:23:16exploration especially manned missions
  2116. 1:23:20unfortunately in the past 17 years we
  2117. 1:23:24have been reminded of the dangers of
  2118. 1:23:26human space flight with the destruction
  2119. 1:23:29of the Space Shuttle Challenger 1996 and
  2120. 1:23:32our 86 I should say now the Columbia
  2121. 1:23:3517 years ago we took a step
  2122. 1:23:40backwards for a few moments to take a
  2123. 1:23:43look at that tragedy and pinpoint to our
  2124. 1:23:45satisfaction what caused it and then
  2125. 1:23:48correct those causes at least the
  2126. 1:23:50technical causes of the loss today I am
  2127. 1:23:54confident that Admiral Gaiman and his
  2128. 1:23:56commission will get to the truths that
  2129. 1:24:00will help us understand
  2130. 1:24:02Colombia's fatal accident
  2131. 1:24:05uh however many questions need to be
  2132. 1:24:08addressed that transcend the immediate
  2133. 1:24:12Technical and managerial problems of
  2134. 1:24:14this tragedy we're going to hear a lot
  2135. 1:24:16about the technical end of it but
  2136. 1:24:18there's a lot of other questions that go
  2137. 1:24:19way beyond that the lack of long-term
  2138. 1:24:22goals or a unifying vision for America's
  2139. 1:24:26space effort for example needs to be
  2140. 1:24:28addressed to fully understand this
  2141. 1:24:30tragedy uh this uh uh failing I believe
  2142. 1:24:35weaken the efforts that would have been
  2143. 1:24:37uh taken to replace the shuttle system
  2144. 1:24:41long before age became a factor and we
  2145. 1:24:45will find out I believe that age was
  2146. 1:24:47indeed a factor uh perhaps Mr Hollings
  2147. 1:24:51is our Senator Hollings is Right perhaps
  2148. 1:24:54it's simple what we're looking at
  2149. 1:24:56perhaps it was the tiles and uh in terms
  2150. 1:24:59of a simple answer and more complex
  2151. 1:25:01answer might be facing it might be age
  2152. 1:25:03but this tragedy and this investigation
  2153. 1:25:06nonetheless gives us an opportunity to
  2154. 1:25:10to revisit the fundamentals and make
  2155. 1:25:13recommendations that will chart
  2156. 1:25:14America's future space Endeavors NASA's
  2157. 1:25:17leadership is faced and will continue to
  2158. 1:25:19face the challenge of exercising
  2159. 1:25:22responsible stewardship
  2160. 1:25:24with limited resources while providing a
  2161. 1:25:28coherent blueprint of what can be
  2162. 1:25:31accomplished and how it can be
  2163. 1:25:32accomplished but hopefully
  2164. 1:25:34forward-looking strategies will lead us
  2165. 1:25:36to incremental advances that will then
  2166. 1:25:40permit us to achieve long-term
  2167. 1:25:43objectives a new propulsion system might
  2168. 1:25:45be a good start as well as perhaps a a
  2169. 1:25:48look at Robotics and remote control on
  2170. 1:25:51the part of NASA a new commitment that
  2171. 1:25:53end but before we move forward we must
  2172. 1:25:56fully understand why these seven people
  2173. 1:25:58perished my question to you today is
  2174. 1:26:02the age Factor was this the shuttle's
  2175. 1:26:06age a 30 year old system a major factor
  2176. 1:26:09in this tragedy we're investigating
  2177. 1:26:13well thank you Congressman uh and again
  2178. 1:26:15I I associate myself entirely with your
  2179. 1:26:17observation that ultimately the
  2180. 1:26:19investigation will be what guides us to
  2181. 1:26:21that conclusion and if that is a factor
  2182. 1:26:23you bet that's exactly what we'll we'll
  2183. 1:26:25operate on having said that
  2184. 1:26:27it is worth noting two really important
  2185. 1:26:30factors on this the Columbia indeed is
  2186. 1:26:32the oldest or was the oldest of the of
  2187. 1:26:34the four orbiters
  2188. 1:26:36uh it was delivered in late 1970s its
  2189. 1:26:39first flight was in 1981.
  2190. 1:26:41it is half it was half the age of the
  2191. 1:26:45average bomber aircraft that flew in
  2192. 1:26:48Afghanistan just a year ago that
  2193. 1:26:51prosecuted that very important effort
  2194. 1:26:53that we were engaged in there so the
  2195. 1:26:56airframe condition on this each time we
  2196. 1:26:59go through this Orbiter major
  2197. 1:27:00modification I refer to in the opening
  2198. 1:27:02statement is essentially the equivalent
  2199. 1:27:04of the same kind of effort the military
  2200. 1:27:07uh the defense department goes through
  2201. 1:27:09of tear down of every single element of
  2202. 1:27:13the the the capability of the Orbiter
  2203. 1:27:16itself its structural Integrity
  2204. 1:27:18inspected and examined very carefully
  2205. 1:27:20then rebuilt to modernize it to
  2206. 1:27:22contemporary capability that particular
  2207. 1:27:25effort had just been conducted an
  2208. 1:27:2818-month uh tear down of the shuttle
  2209. 1:27:30Columbia and delivered early last year
  2210. 1:27:34in advance of the March flight
  2211. 1:27:37that went to Hubble that did the
  2212. 1:27:38servicing mission sts-109 was the first
  2213. 1:27:41flight of Colombia after uh that
  2214. 1:27:44particular Orbiter major modification
  2215. 1:27:47effort which again is is patterned very
  2216. 1:27:50much after the the depot kind of
  2217. 1:27:52approach that's taken uh at all of the
  2218. 1:27:54uh the defense department related assets
  2219. 1:27:56only even more exhaustively to conduct
  2220. 1:27:59the upgrades this was the second flight
  2221. 1:28:01after that particular tear down so the
  2222. 1:28:03age Factor again you're exactly right
  2223. 1:28:05the investigation May yet prove or may
  2224. 1:28:08demonstrate to us that there was a
  2225. 1:28:09contributor there but in terms of our
  2226. 1:28:11efforts to assure that not be a factor
  2227. 1:28:13again it it appears to be every element
  2228. 1:28:17of diligence could be done to assure
  2229. 1:28:20that it was a previous flight that
  2230. 1:28:21operated just perfectly no difficulty
  2231. 1:28:24whatsoever in Colombia no structural
  2232. 1:28:26defects upon return and upon every
  2233. 1:28:29single Orbiter flight return We examine
  2234. 1:28:32all of the elements of the uh of the of
  2235. 1:28:35the shuttles themselves the orbiters
  2236. 1:28:36himself when we move it through the
  2237. 1:28:38Orbiter processing facility to assure
  2238. 1:28:40that any damage any structural problems
  2239. 1:28:42anything are detected there was
  2240. 1:28:44absolutely nothing wrong with Columbia
  2241. 1:28:46that we could detect in that regard so
  2242. 1:28:48when it flew on its second flight it was
  2243. 1:28:50in the same shape it was when it left
  2244. 1:28:52the Orbiter major modification program
  2245. 1:28:54just a year before Senator bro
  2246. 1:29:02uh thank you Mr chairman Mr O'Keefe
  2247. 1:29:05thank you and also congratulate you on
  2248. 1:29:08the method in which you've handled this
  2249. 1:29:11tragedy and the openness that I think
  2250. 1:29:13we've seen from NASA and how you are
  2251. 1:29:16approaching the investigation both
  2252. 1:29:18internally and with the external
  2253. 1:29:21investigation as well let me ask do we
  2254. 1:29:24have any idea of how many
  2255. 1:29:26times the insulating tiles have come off
  2256. 1:29:30a shuttle during launch and how many
  2257. 1:29:33tiles have actually come off in the
  2258. 1:29:36during the history of the shuttle
  2259. 1:29:38launches
  2260. 1:29:39to the best of my Recollections are in
  2261. 1:29:43our efforts there it's no more than a
  2262. 1:29:45half a dozen times
  2263. 1:29:46that was specifically related to it
  2264. 1:29:49there was um
  2265. 1:29:51after each flight there is always again
  2266. 1:29:55as I mentioned just a moment ago to
  2267. 1:29:56Congressman rohrbacher a uh assessment
  2268. 1:30:00summary that's conducted to look at each
  2269. 1:30:02element of the Orbiter when returns is
  2270. 1:30:04also an inspection of the external tank
  2271. 1:30:06which is you're aware when it reaches
  2272. 1:30:09the upper atmosphere it disintegrates
  2273. 1:30:12the two uh solid rocket boosters
  2274. 1:30:16once expended
  2275. 1:30:18drop back into into the ocean on the
  2276. 1:30:20tiles themselves I mean how many times
  2277. 1:30:22have the tiles come off and how many
  2278. 1:30:24tiles have come off during the history
  2279. 1:30:26of the shuttle launches yes sir at each
  2280. 1:30:28flight there's typically uh ding or a
  2281. 1:30:31scratch or whatever else from all the
  2282. 1:30:33the various efforts that occur as they
  2283. 1:30:35are re-entering as well as on Ascent I'm
  2284. 1:30:38gonna provide for the record a full
  2285. 1:30:40summary of all of the times on each
  2286. 1:30:42flight that a tile has been missing or
  2287. 1:30:44lost or whatever else but it was never
  2288. 1:30:46considered to be significant in terms of
  2289. 1:30:49its safety of flight consideration that
  2290. 1:30:51we've examined on the orbiters when we
  2291. 1:30:53moved it through the Orbiter processing
  2292. 1:30:55facility to look at the condition of the
  2293. 1:30:57orbiters after each flight we'll submit
  2294. 1:30:59that for the record if Engineers on this
  2295. 1:31:01particular case had determined that
  2296. 1:31:03insulating tiles had in fact Departed
  2297. 1:31:06the shuttle at some point and that it
  2298. 1:31:09was in a area that was in part and very
  2299. 1:31:12key could the angle of attack on the
  2300. 1:31:15re-entry of the shuttle been adjusted to
  2301. 1:31:17deflect the Heat
  2302. 1:31:18that's a potential maneuvering
  2303. 1:31:20capability but again there are more than
  2304. 1:31:23four thousand sensors aboard each
  2305. 1:31:26shuttle Orbiter and if there were any
  2306. 1:31:28indication
  2307. 1:31:29that the um there were any abnormalities
  2308. 1:31:33as a consequence of tile loss or
  2309. 1:31:36whatever else there likely would have
  2310. 1:31:38shown up during that 16-day orbiting
  2311. 1:31:40Mission uh more importantly during the
  2312. 1:31:43course of that time uh recall that in
  2313. 1:31:47each orbit you're looking at a Sunset
  2314. 1:31:48and a sunrise every 90 minutes which
  2315. 1:31:51means every 16 you know 16 times a day
  2316. 1:31:54the temperature variation on an Orbiter
  2317. 1:31:57or a shuttle flight varies by as much as
  2318. 1:32:00three to four hundred degrees uh two
  2319. 1:32:03plus 200 degrees during the sunlight and
  2320. 1:32:06minus about 150 plus during the darkness
  2321. 1:32:09period of that 90 degree rotation or 90
  2322. 1:32:12minute rotation each time it orbits so
  2323. 1:32:15that wide range of temperature variation
  2324. 1:32:18if there had been exposure almost
  2325. 1:32:20certainly would have shown up on one of
  2326. 1:32:23those 4 000 sensors that are aboard the
  2327. 1:32:26shuttle Orbiter to have given us an
  2328. 1:32:28indication the fact of the matter
  2329. 1:32:29remains there were no abnormalities that
  2330. 1:32:31would suggest that problem until 853 the
  2331. 1:32:34morning of September I'm sorry February
  2332. 1:32:37the First on that Saturday morning but
  2333. 1:32:38is there no way that these sensors or
  2334. 1:32:41any other methodology would have
  2335. 1:32:42determined if any of the tiles had
  2336. 1:32:44Departed the shuttle during the mag and
  2337. 1:32:47during the actual Mission before it
  2338. 1:32:48returned to Earth we don't think so
  2339. 1:32:50every effort that were made on previous
  2340. 1:32:53flights to examine any structural
  2341. 1:32:57uh damage or change or whatever else
  2342. 1:32:59using uh any kind of visual capabilities
  2343. 1:33:03we're either
  2344. 1:33:04inconclusive or not of the level of
  2345. 1:33:07granularity that really gave us that
  2346. 1:33:08much detail and again all the supporting
  2347. 1:33:10data would have also suggested if there
  2348. 1:33:13were problems on it again the reality
  2349. 1:33:15remains over that 16-day mission and
  2350. 1:33:17again the investigation may find some
  2351. 1:33:20data that we're not aware of right now
  2352. 1:33:22because everything was locked down
  2353. 1:33:23within a half an hour after the incident
  2354. 1:33:24if there's something else that emerges
  2355. 1:33:26to suggests to the contrary we're going
  2356. 1:33:28to get to the bottom of it but all the
  2357. 1:33:29information we have now and after that
  2358. 1:33:32after the flight and after the
  2359. 1:33:33examination of it suggests no
  2360. 1:33:35abnormalities that would have pointed in
  2361. 1:33:36that direction at all
  2362. 1:33:38what degree of certainty of jobs time is
  2363. 1:33:40expired
  2364. 1:33:42cause cause Gordon
  2365. 1:33:45thank you Mr chairman and welcome Mr
  2366. 1:33:47O'Keefe glad you joined us today before
  2367. 1:33:50I move to discuss other issues I just
  2368. 1:33:52want to stress my concern that the
  2369. 1:33:54investigation of the Columbia Space
  2370. 1:33:55Shuttle accident ultimately must be
  2371. 1:33:58perceived as objective and independent
  2372. 1:34:01if Congress the president and the
  2373. 1:34:03American taxpayers are going to reach a
  2374. 1:34:05consensus on how to move forward with
  2375. 1:34:07our space program
  2376. 1:34:09it's no reflection on you or the Admiral
  2377. 1:34:11but that's not going to be possible if
  2378. 1:34:13there are lingering questions regarding
  2379. 1:34:15the independence of the board
  2380. 1:34:17as you know I've raised this question
  2381. 1:34:18for several days now and having checked
  2382. 1:34:20with your office this week and the NASA
  2383. 1:34:22website this morning there seems to be a
  2384. 1:34:24clear disconnect from your statements
  2385. 1:34:26about the board's Independence and the
  2386. 1:34:28rules you're laying down for the board
  2387. 1:34:29let me quote just a few examples of your
  2388. 1:34:32rules as Mr Boulder had earlier the
  2389. 1:34:35current board not only includes NASA
  2390. 1:34:37employees but you also require it to be
  2391. 1:34:40staffed by NASA employees who will help
  2392. 1:34:42write the board's final report which
  2393. 1:34:44goes to you
  2394. 1:34:46you require that the board must and I
  2395. 1:34:48quote schedule board activities enter on
  2396. 1:34:51board reports and submit final board
  2397. 1:34:53reports in coordination with the NASA
  2398. 1:34:56administrator in accordance with the
  2399. 1:34:57applicable NASA policies and Mr Keith
  2400. 1:35:01I'm afraid this won't pass anybody's
  2401. 1:35:04smell test of Independence so please
  2402. 1:35:06let's move forward in a concrete way and
  2403. 1:35:09put this bipartisan concern behind us
  2404. 1:35:11now let me turn to another issue that is
  2405. 1:35:13troubling
  2406. 1:35:14as you know there have been numerous
  2407. 1:35:16warning flags regarding the health of
  2408. 1:35:17the shuttle program in recent years
  2409. 1:35:19just a few examples April 2002 Richard
  2410. 1:35:23Bloomberg head of the independent
  2411. 1:35:25Aerospace safety advisory panel issued a
  2412. 1:35:28blunt warning when he testified before
  2413. 1:35:30this house subcommittee and I quote in
  2414. 1:35:33all the years of my involvement I have
  2415. 1:35:35never been as concerned for the space
  2416. 1:35:37shuttle safety as I am now a month
  2417. 1:35:40earlier the Aerospace safety advisory
  2418. 1:35:43panel gave you a report that stated and
  2419. 1:35:45I quote the current and proposed budgets
  2420. 1:35:48are not sufficient to improve or even
  2421. 1:35:51maintain the safety risk level of
  2422. 1:35:54operations for the space shuttle
  2423. 1:35:56yet in spite of These Warnings you sent
  2424. 1:35:58over a NASA budget request that cut the
  2425. 1:36:00budget for shuttle upgrades but 500
  2426. 1:36:03million dollars even while finding a
  2427. 1:36:05billion dollars for new initiatives
  2428. 1:36:07because of my concern I asked Fred
  2429. 1:36:09Gregory who was then the NASA associate
  2430. 1:36:11administrator for space flight the
  2431. 1:36:13following question at the same April
  2432. 1:36:152002 hearing Mr Gregory how would you
  2433. 1:36:19support the space station in the event
  2434. 1:36:21you lost the shuttle and the rest of the
  2435. 1:36:24fleet was grounded for some period of
  2436. 1:36:26time
  2437. 1:36:26Mr Gregory responded
  2438. 1:36:29there would be no way to do that
  2439. 1:36:33I assume that such an admission would
  2440. 1:36:35have kicked off an intense effort to
  2441. 1:36:37develop a contingency plan for
  2442. 1:36:39supporting the space station however at
  2443. 1:36:41your press briefing Monday you indicated
  2444. 1:36:43that over the next few weeks NASA would
  2445. 1:36:46be working with a space station
  2446. 1:36:47International Partners to come up with a
  2447. 1:36:49plan you reiterated that earlier today
  2448. 1:36:53given the fact that you had numerous
  2449. 1:36:54warnings and you knew the shuttle was
  2450. 1:36:56grounded for two and a half years after
  2451. 1:36:58the loss of Challenger I would assume Mr
  2452. 1:37:00Gregory's admission nearly a year ago
  2453. 1:37:02would have been a wake-up call so my
  2454. 1:37:04questions are did NASA prepare a
  2455. 1:37:07contingency plan for the space station
  2456. 1:37:08last year if so what was in the plan and
  2457. 1:37:12why do you now believe that you need to
  2458. 1:37:14redo it and finally if you didn't have a
  2459. 1:37:16plan
  2460. 1:37:17why not
  2461. 1:37:19yes sir we did prepare a contingency
  2462. 1:37:21plan I guess I've outlined a number of
  2463. 1:37:23those options you've acknowledged that
  2464. 1:37:24you heard those as part of the
  2465. 1:37:26presentation of the testimony we'll
  2466. 1:37:28continue to look at those Alternatives
  2467. 1:37:29using soyuz as well as progress vehicles
  2468. 1:37:32and we're also hopeful of an expeditious
  2469. 1:37:35conclusion that would tell us what
  2470. 1:37:37occurred on shuttle Columbia that would
  2471. 1:37:40give us an opportunity to return to
  2472. 1:37:42flight expeditiously all those factors
  2473. 1:37:44are in play those are all part of that
  2474. 1:37:45continuously plan I think the specific
  2475. 1:37:47reference in this case and the
  2476. 1:37:49testimonial site was no way to get back
  2477. 1:37:52with shuttle immediately given the
  2478. 1:37:54safety considerations that we will
  2479. 1:37:55always ground the fleet under those
  2480. 1:37:58circumstances I fully concur in your
  2481. 1:38:00opening comments too as it pertains to
  2482. 1:38:02Charter revisions to the extent they're
  2483. 1:38:04necessary as I pledge to Chairman
  2484. 1:38:05Bullard we will make those changes in
  2485. 1:38:07any way that Admiral Gaiman feels he has
  2486. 1:38:10to have in order to guarantee that
  2487. 1:38:11Independence I have no no difficulty
  2488. 1:38:14whatsoever understanding his
  2489. 1:38:17requirements for Independence and he has
  2490. 1:38:19reiterated those I intend to comply
  2491. 1:38:21exactly with that approach well the
  2492. 1:38:23senator Fitzgerald okay
  2493. 1:38:27um
  2494. 1:38:32I happen to be having a town hall
  2495. 1:38:34meeting in Champaign Illinois
  2496. 1:38:37and I asked there were about two maybe
  2497. 1:38:42250 people in the room
  2498. 1:38:44I asked them whether they thought we
  2499. 1:38:47should continue with manned exploration
  2500. 1:38:49of space and I explained to them that it
  2501. 1:38:52could cost us billions of dollars and
  2502. 1:38:55years
  2503. 1:38:56to make
  2504. 1:38:58ourselves able to continue going forward
  2505. 1:39:02in space
  2506. 1:39:04to my surprise I'd say about
  2507. 1:39:07four-fifths of the people in that room
  2508. 1:39:09wanted us to go back and continue human
  2509. 1:39:13exploration of space and in my state of
  2510. 1:39:16Illinois has very little in the way of
  2511. 1:39:19spending that it benefits from we're not
  2512. 1:39:21Florida or Texas
  2513. 1:39:23and and I want the space program to
  2514. 1:39:26continue and I wondered
  2515. 1:39:28if you had a gut impression at this
  2516. 1:39:31point and I know it's early but it seems
  2517. 1:39:33to me that we can go in one of two
  2518. 1:39:34directions we could spend billions of
  2519. 1:39:36dollars and perhaps years trying to
  2520. 1:39:40patch up and fix whatever may be wrong
  2521. 1:39:43with the shuttle program but you're
  2522. 1:39:46basically dealing with a 30 year old
  2523. 1:39:48design
  2524. 1:39:49my understanding is there are some 1.2
  2525. 1:39:52million checks that have to be done by
  2526. 1:39:56hundreds of people before a single
  2527. 1:39:58shuttle flight can take off it's
  2528. 1:40:01extraordinarily complex my question is
  2529. 1:40:04do we go forward and spend that time and
  2530. 1:40:06that money reinforcing the shuttle
  2531. 1:40:09program
  2532. 1:40:10or would we be better off
  2533. 1:40:13not diverting the resources to
  2534. 1:40:16reinforcing this 30 year old shuttle
  2535. 1:40:18program and instead try and proceed with
  2536. 1:40:21a new
  2537. 1:40:23vehicle and focus all our effort on that
  2538. 1:40:27no thank you Senator I the the factors I
  2539. 1:40:31think that lead to uh the complexity of
  2540. 1:40:34the shuttle and the amount of checking
  2541. 1:40:36that goes on there certainly is driven
  2542. 1:40:37by the technology no doubt about that
  2543. 1:40:40the number of moving Parts on that asset
  2544. 1:40:42but I would submit that any asset we
  2545. 1:40:44have uh that would use for the purpose
  2546. 1:40:47of of a reusable launch vehicle
  2547. 1:40:49capability to launch would also require
  2548. 1:40:52an awful lot of checks as well because
  2549. 1:40:54of the absolute dedication the
  2550. 1:40:56unwavering commitment to safety that we
  2551. 1:40:58always pursue every time we launch a
  2552. 1:41:00shuttle flight no matter what that asset
  2553. 1:41:02is would be it would require I think a
  2554. 1:41:05review of all the systems checks and the
  2555. 1:41:07ethos that we have within the agency and
  2556. 1:41:09all that are part of the community is
  2557. 1:41:11that there's a single thing that is
  2558. 1:41:13wrong or that appears to be wrong and
  2559. 1:41:15the Judgment of any individual there's a
  2560. 1:41:18process set up to stop the launch two
  2561. 1:41:21weeks in advance there's a flight
  2562. 1:41:22Readiness review that runs to ground
  2563. 1:41:24every issue involved in that if there's
  2564. 1:41:26any residual issues all the way up to
  2565. 1:41:28the moment of launch we don't do that I
  2566. 1:41:30don't Envision that changing even with a
  2567. 1:41:32even if we had a system today that was
  2568. 1:41:34brand new I think that same ethos would
  2569. 1:41:36have to dominate because we really are
  2570. 1:41:37committed to that objective to minimize
  2571. 1:41:39the risk we'll never drive the risk out
  2572. 1:41:41of it completely and so I think that's
  2573. 1:41:43that same approach would be employed no
  2574. 1:41:45matter what assets or capabilities
  2575. 1:41:47having said all that if the
  2576. 1:41:49investigation leads us to conclude that
  2577. 1:41:51there is anything structurally deficient
  2578. 1:41:53about the the continued safe operations
  2579. 1:41:56of the the shuttle system we positively
  2580. 1:41:59will take that as a very strong uh
  2581. 1:42:02element of the investigation findings
  2582. 1:42:04and make judgments accordingly that may
  2583. 1:42:06lead us in the kinds of directions
  2584. 1:42:07you're talking about in the interim
  2585. 1:42:09again our approach is as I discussed
  2586. 1:42:12with Congressman rohrbacher we tear down
  2587. 1:42:14this system about every eight to ten
  2588. 1:42:16flights essentially rebuild it as new
  2589. 1:42:19and it goes through that 18 to 24 month
  2590. 1:42:22Orbiter major modification program and
  2591. 1:42:25so every time that asset goes up there
  2592. 1:42:26it is as safe as we know how to make it
  2593. 1:42:28we'll never drive the risk out entirely
  2594. 1:42:31but we're trying to manage it down to
  2595. 1:42:33the lowest possible level and assure
  2596. 1:42:35that anything that appears even vaguely
  2597. 1:42:37awry is beaten to parade rest before we
  2598. 1:42:40let the the flight take off and during
  2599. 1:42:42orbit as well gentleman's time is
  2600. 1:42:44expired Mr Calvert thank you Mr chairman
  2601. 1:42:47uh thank you for Miss Mr O'Keefe for
  2602. 1:42:49attending today and certainly my
  2603. 1:42:51sympathies to the family and to the to
  2604. 1:42:53the NASA family that's certainly still
  2605. 1:42:55grieving over this loss
  2606. 1:42:57um
  2607. 1:42:58I think all of us here today share one
  2608. 1:43:01thing and that's that we desire an
  2609. 1:43:03independent assessment
  2610. 1:43:04unbiased and with the highest Integrity
  2611. 1:43:06insurer
  2612. 1:43:08the future astronauts NASA this Congress
  2613. 1:43:11and the country have confidence in its
  2614. 1:43:13ultimate result
  2615. 1:43:15certainly you're off to a good start and
  2616. 1:43:17I certainly appreciate that and I know
  2617. 1:43:19that we do in the country does but as
  2618. 1:43:21chairman bowler has indicated it may be
  2619. 1:43:23necessary that changes be made to make
  2620. 1:43:26sure we maintain that confidence and I
  2621. 1:43:28thankful that you're open-minded to that
  2622. 1:43:32it's reported that we have a certain
  2623. 1:43:35amount of money appropriate I believe
  2624. 1:43:36about 50 million dollars for NASA to uh
  2625. 1:43:40to complete this investigation
  2626. 1:43:42is that funding adequate to pursue in
  2627. 1:43:44your in your mind to the to the levels
  2628. 1:43:47that we're discussing
  2629. 1:43:49I don't know sir uh the as I understand
  2630. 1:43:52it that's part of the current
  2631. 1:43:53Appropriations conference deliberations
  2632. 1:43:55I've I've read the same press accounts
  2633. 1:43:57you have I have no other knowledge of
  2634. 1:43:59what you and your colleagues may have in
  2635. 1:44:01mind for that Omnibus Appropriations
  2636. 1:44:03Bill provisioning and so I can't make an
  2637. 1:44:05assessment of that and I don't know what
  2638. 1:44:07the cost of this will be other than to
  2639. 1:44:08say that whatever it costs that's what
  2640. 1:44:10we ought to spend in order to be sure
  2641. 1:44:12that we reach the answers to what caused
  2642. 1:44:14this accident
  2643. 1:44:16um obviously NASA is not the only agency
  2644. 1:44:18that's going to be involved in this
  2645. 1:44:20investigation are you receiving
  2646. 1:44:22cooperation from other agencies a full
  2647. 1:44:25cooperation yes sir it's overwhelming
  2648. 1:44:28there is no hesitancy there is no
  2649. 1:44:31confusion of how that process works I've
  2650. 1:44:34just been amazed to see how
  2651. 1:44:36forward-leaning 20 different federal
  2652. 1:44:38agencies state and local law enforcement
  2653. 1:44:41officials from Texas and Louisiana have
  2654. 1:44:43been and helping us work through what is
  2655. 1:44:45a real nightmare a circumstance in a way
  2656. 1:44:47that's professional above board and
  2657. 1:44:49fully Cooperative no hesitation on that
  2658. 1:44:51point at all and that also would apply
  2659. 1:44:53to the contractors that are involved in
  2660. 1:44:55this program sure absolutely
  2661. 1:44:57um I know I've read the press for quotes
  2662. 1:45:00uh you uh mentioned just as yesterday
  2663. 1:45:02you had no favorite theories of what
  2664. 1:45:05occurred and I I understand that
  2665. 1:45:08um
  2666. 1:45:09however as we move forward in this
  2667. 1:45:12Congress
  2668. 1:45:13I I guess what that would
  2669. 1:45:17Mr rohrbacher and others have indicated
  2670. 1:45:20do you believe because of the age of the
  2671. 1:45:23shuttle there is any systemic problem
  2672. 1:45:26that that may be there and um what's our
  2673. 1:45:30Alternatives if in fact that's the case
  2674. 1:45:32again none that I'm aware of and again
  2675. 1:45:34we go through an exhaustive process to
  2676. 1:45:36assure that safety of flight operations
  2677. 1:45:38is adhered to each and every time this
  2678. 1:45:41is not a one one shot deal it's every
  2679. 1:45:43every time it comes back the orbiters
  2680. 1:45:45return we do a careful inspection we go
  2681. 1:45:48through a very exhaustive review of
  2682. 1:45:50everything and we do not roll it out
  2683. 1:45:52immediately there's an Orbiter
  2684. 1:45:54processing facility effort that goes on
  2685. 1:45:57for the better part of three months as
  2686. 1:45:58we move it through an exhaustive
  2687. 1:46:00examination and then when it gets out to
  2688. 1:46:03the launch pad typically it's there for
  2689. 1:46:04the better part of 30 days in order to
  2690. 1:46:07make sure every single thing checks out
  2691. 1:46:09so if there's something systemically
  2692. 1:46:11wrong we will be guided by the the
  2693. 1:46:14gaming board's view of that and we'll
  2694. 1:46:16correct it but based on our assessment
  2695. 1:46:18right now and everything we've done uh
  2696. 1:46:21it sure doesn't look like a systemic
  2697. 1:46:22failure but if it is we positively will
  2698. 1:46:25correct that before we launch ever again
  2699. 1:46:27thank you thank you
  2700. 1:46:31Senator Durkin
  2701. 1:46:34Mr O'Keefe thank you for before being
  2702. 1:46:36here today uh I I think most of us feel
  2703. 1:46:39that a nation that doesn't explore as a
  2704. 1:46:41nation that's standing still and and
  2705. 1:46:43this space program must continue
  2706. 1:46:46exploring the frontiers of space I want
  2707. 1:46:50to ask you a question and I don't want
  2708. 1:46:52you to think the origin of my question
  2709. 1:46:54poses any distrust for you or the men
  2710. 1:46:56and women of NASA I have great
  2711. 1:46:58admiration for your leadership and also
  2712. 1:47:00for the men and women of NASA
  2713. 1:47:02but as we attempt to find out what
  2714. 1:47:04happened with this tragedy it seems to
  2715. 1:47:07me that in almost any circumstance of
  2716. 1:47:09this type an agency can't very
  2717. 1:47:11effectively investigate itself
  2718. 1:47:13I feel there's ought to be a
  2719. 1:47:16presidential commission in panel I would
  2720. 1:47:18ask the question have you had a chance
  2721. 1:47:20to visit with President Bush about the
  2722. 1:47:22prospect of that and can it be done in
  2723. 1:47:25enveloping
  2724. 1:47:26reconfiguring the kind of commission
  2725. 1:47:29that you have now created yes sir no yes
  2726. 1:47:31indeed we have visited on the question
  2727. 1:47:33uh to to print the president as well as
  2728. 1:47:36vice president and all the senior staff
  2729. 1:47:37on the issue and I guess the approach
  2730. 1:47:39that that history is a guide in these
  2731. 1:47:42cases
  2732. 1:47:43in the Challenger accident it was five
  2733. 1:47:46days after the accident the President
  2734. 1:47:48Reagan announced the intent to appoint a
  2735. 1:47:50commission it was the better part of 10
  2736. 1:47:52days to two weeks before they assembled
  2737. 1:47:54it was probably the better end of three
  2738. 1:47:56to four weeks before they were fully
  2739. 1:47:58prepared to engage and really start
  2740. 1:48:01taking testimony and doing the things
  2741. 1:48:02that were necessary
  2742. 1:48:04and they still nonetheless produced a a
  2743. 1:48:07set of findings and recommendations
  2744. 1:48:10uh by June of 1986 so roughly six months
  2745. 1:48:14after the the accident they were able to
  2746. 1:48:17reach some conclusions in this
  2747. 1:48:19circumstance given the the development
  2748. 1:48:22of this contingency plan that we put
  2749. 1:48:23together uh and as in lesson learned
  2750. 1:48:26from Challenger and there was an awful
  2751. 1:48:28lot that we learned out of that event
  2752. 1:48:29that really informed us about how we
  2753. 1:48:31ought to go ahead and look at ourselves
  2754. 1:48:34and how we do business and what it
  2755. 1:48:36called for as part of that contingency
  2756. 1:48:37plan was to identify by positions the
  2757. 1:48:41kinds of people that ought to be
  2758. 1:48:43activated who are non-nasa uh uh
  2759. 1:48:46individuals and experts and mobilize
  2760. 1:48:49them right away and so as a consequence
  2761. 1:48:51what we defaulted in favor of in this
  2762. 1:48:52case was speed and we had an opportunity
  2763. 1:48:55then to have all the members except one
  2764. 1:48:58who is a NASA Center Director of a
  2765. 1:49:00non-space flight center who has no
  2766. 1:49:02involvement with space flight at all Who
  2767. 1:49:04was appointed to that particular board
  2768. 1:49:05everybody else is removed from it well
  2769. 1:49:08and we're moving ahead in that regard as
  2770. 1:49:10into tenant as we can possibly make that
  2771. 1:49:11can I make the point that I think you
  2772. 1:49:13did exactly the right thing because you
  2773. 1:49:15don't want time to elapse you took
  2774. 1:49:16action and did the right thing I'm
  2775. 1:49:18asking I guess as we go along whether a
  2776. 1:49:21presidential commission can now envelop
  2777. 1:49:24reconfigure the commission that you have
  2778. 1:49:26started I I really do think that a year
  2779. 1:49:30from now three five years from now the
  2780. 1:49:33question people will ask was could NASA
  2781. 1:49:35really have investigated itself again I
  2782. 1:49:38don't say that with any distrust at all
  2783. 1:49:39I think you've got a great organization
  2784. 1:49:41but I really do hope as we go along here
  2785. 1:49:43we're finding a way to to perhaps have a
  2786. 1:49:46presidential commission we don't want to
  2787. 1:49:49duplicate different investigations but I
  2788. 1:49:51think this can be done in the right way
  2789. 1:49:53and will resolve these questions of
  2790. 1:49:55Independence that's right so let me uh
  2791. 1:49:58wish you well and and please extend on
  2792. 1:50:00behalf of all of us in Congress our
  2793. 1:50:02thoughts and prayers to the men and
  2794. 1:50:03women of NASA thank you Senator we're
  2795. 1:50:05committed to exactly the same objective
  2796. 1:50:07we want to find the answers and we want
  2797. 1:50:08it to be credible and there's no
  2798. 1:50:10question about that at all so whatever
  2799. 1:50:12it's going to take in order to do that
  2800. 1:50:13that's what we are committed to doing uh
  2801. 1:50:16and the process again is not
  2802. 1:50:17investigating ourselves this is an
  2803. 1:50:19independent group of folks who have no
  2804. 1:50:21you know baggage to carry as it pertains
  2805. 1:50:23to you know NASA biases Admiral Gaiman
  2806. 1:50:26uh came from uh distinguished Naval
  2807. 1:50:29career year that had no involvement
  2808. 1:50:30whatsoever with NASA and yet at the same
  2809. 1:50:33time I think he's had a lot of
  2810. 1:50:34experience as all the other members did
  2811. 1:50:36a better than 50 different
  2812. 1:50:37investigations on into accident
  2813. 1:50:39situations so this is not a group of
  2814. 1:50:42NASA investigating itself this is going
  2815. 1:50:44to be an independent group that's going
  2816. 1:50:45to reach some conclusions and we want to
  2817. 1:50:47make sure that's as credible as we can
  2818. 1:50:49possibly make it because that's going to
  2819. 1:50:51turn on I think the trust and confidence
  2820. 1:50:53of the American people depend upon that
  2821. 1:50:54your point is exactly right I associate
  2822. 1:50:56myself with that sentiment as well Mr
  2823. 1:50:59Lamson
  2824. 1:51:00I want to thank you Mr O'Keefe for
  2825. 1:51:03coming to Capitol Hill to testify today
  2826. 1:51:04and as a member of Congress who
  2827. 1:51:06represents the Johnson Space Center I
  2828. 1:51:08would also want to thank you and your
  2829. 1:51:10NASA team for the support and
  2830. 1:51:11encouragement that you've provided to
  2831. 1:51:13the Space Center community in Houston
  2832. 1:51:15during this very difficult time
  2833. 1:51:18I'm somewhat a reluctant participant in
  2834. 1:51:20this hearing today is the 11th day since
  2835. 1:51:23the tragic loss of space shuttle
  2836. 1:51:25Columbia there's so much that we do not
  2837. 1:51:27yet know and perhaps some things that we
  2838. 1:51:30may never know
  2839. 1:51:31it's my understanding that there were no
  2840. 1:51:33Congressional hearings on the Challenger
  2841. 1:51:35investigation in 1986 until after the
  2842. 1:51:37Rogers commission completed their report
  2843. 1:51:39four months later when I know we're
  2844. 1:51:42operating under different circumstances
  2845. 1:51:43with three astronauts orbiting the earth
  2846. 1:51:45and the International Space Station
  2847. 1:51:47I do question the merits of having this
  2848. 1:51:49hearing so soon after the Columbia
  2849. 1:51:50shuttle accident
  2850. 1:51:52I believe Congress needs to allow the
  2851. 1:51:54investigation to move forward and to let
  2852. 1:51:56the accident investigation board members
  2853. 1:51:58do their work hopefully we will
  2854. 1:52:00complement your efforts and not impede
  2855. 1:52:02the process that being said
  2856. 1:52:04I firmly believe that the administration
  2857. 1:52:06needs to move forward with a truly
  2858. 1:52:08independent investigation similar to
  2859. 1:52:10what President Reagan appointed in 1986
  2860. 1:52:12after the Challenger accident I think
  2861. 1:52:15NASA made a good first step by revising
  2862. 1:52:17the board's Charter last week but I
  2863. 1:52:18still believe as my colleagues have
  2864. 1:52:20stated that NASA's external
  2865. 1:52:22investigation team is too closely tied
  2866. 1:52:24to the agency
  2867. 1:52:25as NASA administrator the board's
  2868. 1:52:28Charter allows you to appoint the team
  2869. 1:52:30members to staff the board with NASA
  2870. 1:52:32employees and receive the final report
  2871. 1:52:34in order for this review to have
  2872. 1:52:36credibility I believe it needs to have
  2873. 1:52:38team members who are truly independent
  2874. 1:52:40any report to the White House in
  2875. 1:52:42Congress
  2876. 1:52:43also seeing all the cameras and the
  2877. 1:52:46media presence in this hearing room
  2878. 1:52:48today begs the question where was all of
  2879. 1:52:51this attention to our human space
  2880. 1:52:53flight programs before February 1st
  2881. 1:52:56while I applaud the renewed interest I
  2882. 1:52:58regret that it takes the loss of seven
  2883. 1:53:01fine astronauts for our space program to
  2884. 1:53:03make the front page of the newspaper or
  2885. 1:53:06the top story on the evening news
  2886. 1:53:08and while it may seem routine the work
  2887. 1:53:10that is being done by NASA in our outer
  2888. 1:53:12space is far from routine we're doing so
  2889. 1:53:15many great things in space that benefit
  2890. 1:53:17us right here on Earth My Hope Is that
  2891. 1:53:19somehow this terrible tragedy will spur
  2892. 1:53:21the administration to develop the an
  2893. 1:53:23interest in a real truly robust space
  2894. 1:53:26program and I'd like to call for a new
  2895. 1:53:29space race for the 21st century this
  2896. 1:53:31space race is not against the co- old
  2897. 1:53:34Cold War enemy or an emerging power in
  2898. 1:53:37the East but rather our new space race
  2899. 1:53:40needs to be against ourselves for our
  2900. 1:53:42own future and let me ask two things Mr
  2901. 1:53:45O'Keefe first a copy of the outgoing
  2902. 1:53:47plan uh uh are the contingency plan for
  2903. 1:53:51the International Space Station that you
  2904. 1:53:52referred to a few minutes ago could you
  2905. 1:53:54possibly get that to us within the next
  2906. 1:53:56week or so we would appreciate it and
  2907. 1:53:58then let me ask in 1999 when problems
  2908. 1:54:00with the experimental x33 reusable
  2909. 1:54:02launch vehicle demonstrator made it
  2910. 1:54:04clear the space shuttle would have to be
  2911. 1:54:06relied on for many more you years
  2912. 1:54:08perhaps until 2020. the Clinton
  2913. 1:54:10administration's OMB sensibly increased
  2914. 1:54:13the space shuttle upgrades budget
  2915. 1:54:14significantly however in 2001 the bush
  2916. 1:54:17administration's OMB of which you were
  2917. 1:54:19deputy director simultaneously canceled
  2918. 1:54:22x-33 program and cut the space shuttle
  2919. 1:54:26safety upgrades budget
  2920. 1:54:28how can that possibly have made sense
  2921. 1:54:30and can you tell us why you did that
  2922. 1:54:32uh
  2923. 1:54:34again I'd have to go back and take a
  2924. 1:54:35look at when NASA canceled the x-33
  2925. 1:54:38program and exactly what was was leading
  2926. 1:54:40to that particular case but if I could
  2927. 1:54:41get slide 16 please
  2928. 1:54:44um the the history over the course of
  2929. 1:54:46the time as I understand it was a span
  2930. 1:54:49that you'll see on this particular slide
  2931. 1:54:50that was for shuttle funding over the
  2932. 1:54:53course of that time
  2933. 1:54:54the increase that you see occurred again
  2934. 1:54:58as part of the fiscal year 03 budget
  2935. 1:55:01proposal that we've made and 04 that was
  2936. 1:55:03just submitted to the Congress last
  2937. 1:55:04Monday so that my my reading of the of
  2938. 1:55:08the the data and the information is that
  2939. 1:55:10there's an awful lot to this particular
  2940. 1:55:12change in funding profile over the span
  2941. 1:55:15of time but it was primarily driven by a
  2942. 1:55:18concurrent uh I think focus on safety
  2943. 1:55:21improvements and and and kind of
  2944. 1:55:23concentrating on all of the uh factors
  2945. 1:55:27that would lead to safe flight
  2946. 1:55:28operations and concurrently efficiencies
  2947. 1:55:30that drove down the cost of guaranteeing
  2948. 1:55:33those particular safe flight operations
  2949. 1:55:34through the 90s and the most significant
  2950. 1:55:37increase that's occurred is part of the
  2951. 1:55:39fiscal year 03 budget amendment the
  2952. 1:55:40president submitted last November and
  2953. 1:55:43the fiscal year 04 budget that was
  2954. 1:55:44submitted last Monday so those are the
  2955. 1:55:47primary increases that I've been able to
  2956. 1:55:49examine but certainly be prepared to
  2957. 1:55:50submit all that for the record for your
  2958. 1:55:52consideration sir thank you Senator
  2959. 1:55:54Allen one other comment if I could uh
  2960. 1:55:55sir is just to reiterate again that the
  2961. 1:55:57gaming commission will report to all of
  2962. 1:56:00us
  2963. 1:56:01you can report to the president to
  2964. 1:56:03Congress to all the American people as
  2965. 1:56:05soon as they reach findings I have no
  2966. 1:56:07intention whatsoever of putting any
  2967. 1:56:09value added to their findings as soon as
  2968. 1:56:11the ink is dry it will be released by
  2969. 1:56:14Hal Gaiman there is no other approach
  2970. 1:56:16that I can think of that would be a more
  2971. 1:56:19appropriate way to handle this so we can
  2972. 1:56:21move on with finding what the solution
  2973. 1:56:23is to the problem get the answers to it
  2974. 1:56:25and make the corrections necessary to
  2975. 1:56:27get back to Flying safely thank you
  2976. 1:56:29Senator Allen thank you Mr chairman
  2977. 1:56:31thank you Mr O'Keefe for being here
  2978. 1:56:35I want to associate myself with some of
  2979. 1:56:37the the thoughts and philosophy
  2980. 1:56:40stated in the beginning by our chairman
  2981. 1:56:41Senator McCain
  2982. 1:56:43and I want to focus on the long-term
  2983. 1:56:45goals of of NASA broader goals if
  2984. 1:56:48anything good can come out of this
  2985. 1:56:50tragedy I think it would be the
  2986. 1:56:51reinvigorated focus on the mission
  2987. 1:56:53primary mission of NASA which ought to
  2988. 1:56:56be scientific research that has benefits
  2989. 1:56:58for people here on Earth and I think
  2990. 1:57:01such sensible strategic planning
  2991. 1:57:04would be a salutary goal and part of the
  2992. 1:57:07legacy of the tragic loss of these brave
  2993. 1:57:10men and women and I know that of
  2994. 1:57:13Paramount concern to you and all the
  2995. 1:57:14people in NASA is safety and safety for
  2996. 1:57:17humans and primarily
  2997. 1:57:20the
  2998. 1:57:22previously before this tragedy I know
  2999. 1:57:25you were on record to supporting
  3000. 1:57:26refurbished or upgraded shuttles so they
  3001. 1:57:28can remain operational for the next 10
  3002. 1:57:30to 20 years
  3003. 1:57:32I think in examining the broader goals
  3004. 1:57:34of NASA it would be helpful if we'd
  3005. 1:57:36have some consideration of what is going
  3006. 1:57:40to be the next Orbiter there are so many
  3007. 1:57:42questions that we have to determine and
  3008. 1:57:45this is just the beginning of this
  3009. 1:57:46examination once we get into our
  3010. 1:57:48committees in the House and Senate we'll
  3011. 1:57:49get in Greater detail but my question
  3012. 1:57:52is is specific on Automation and
  3013. 1:57:55Robotics and how can Robotics and uh
  3014. 1:57:59Automation and advances in technology
  3015. 1:58:01how can that make it safer it is less
  3016. 1:58:05costly but it's also safer for human
  3017. 1:58:07life and so is nasics considering an
  3018. 1:58:10entirely new space plane Orbiter or
  3019. 1:58:13downsizing the manned space flight
  3020. 1:58:14depending on which option is chosen how
  3021. 1:58:17will that shape our efforts our efforts
  3022. 1:58:20also it's it's the 30 billion dollars of
  3023. 1:58:24course that we've already invested in
  3024. 1:58:25this space station the International
  3025. 1:58:27Space Station isn't as as an investment
  3026. 1:58:30but where are we in in embracing some of
  3027. 1:58:34these advancements in Automation and
  3028. 1:58:36Robotics and in the strategic planning
  3029. 1:58:38will it affect the continued dangerously
  3030. 1:58:42underfunding of of Aeronautics which I
  3031. 1:58:44think have tangible
  3032. 1:58:46benefits to us militarily as well as in
  3033. 1:58:49the commercial markets so if you'd like
  3034. 1:58:51your thoughts on on these key paths that
  3035. 1:58:54we need to go down and decide which ones
  3036. 1:58:57we're going to go down in the future
  3037. 1:58:58thank you Senator it is
  3038. 1:59:01in my judgment not a an issue of either
  3039. 1:59:04or robotics or human space flight it's
  3040. 1:59:07how do you do it compatibly how do you
  3041. 1:59:09find the appropriate
  3042. 1:59:11role for robotic capabilities that set
  3043. 1:59:14and advance
  3044. 1:59:15the kind of knowledge base that you need
  3045. 1:59:17in order to then support when necessary
  3046. 1:59:20and in the circumstances where human
  3047. 1:59:23intervention and human involvement then
  3048. 1:59:25becomes a very critical again the Hubble
  3049. 1:59:27telescope is the classic example here's
  3050. 1:59:30a marvelous piece of Machinery that
  3051. 1:59:31didn't work and the only way it could be
  3052. 1:59:33adjusted was to have human involvement
  3053. 1:59:36in order to make those adjustments on
  3054. 1:59:37each of the respective servicing
  3055. 1:59:39missions that have gone on and now it's
  3056. 1:59:41it's it is rewriting the astronomy books
  3057. 1:59:43it is a classic example of how that
  3058. 1:59:46compatibility between Robotics and the
  3059. 1:59:48use of human space flight Intervention
  3060. 1:59:51when necessary can advance the knowledge
  3061. 1:59:53base dramatically but we have to really
  3062. 1:59:56focus on the risk management side of
  3063. 1:59:58this and assure that we always use those
  3064. 2:00:00robotic capabilities I think as you've
  3065. 2:00:01suggested as a way to fully you know
  3066. 2:00:04beat down any of the the manageable risk
  3067. 2:00:07that we see before involving a human
  3068. 2:00:10space flight capability for that reason
  3069. 2:00:12as well as being careful about when you
  3070. 2:00:15utilize uh the human involvement
  3071. 2:00:17Dimension to this that's part of the
  3072. 2:00:18reason and a lot of the reason why the
  3073. 2:00:21Mars program that we're pursuing uh for
  3074. 2:00:23the Mars Landers that are planning for
  3075. 2:00:24later this year and arriving in January
  3076. 2:00:27of 04 is to advance that knowledge base
  3077. 2:00:29understand fully what's going on in
  3078. 2:00:32order to then fully support what could
  3079. 2:00:34be down the road a human uh a mission
  3080. 2:00:37that could support that case if deemed
  3081. 2:00:39appropriate necessary and supported by
  3082. 2:00:42the research and the science
  3083. 2:00:43opportunities that could be yielded so
  3084. 2:00:46the strategy you've talked about and the
  3085. 2:00:48approach that you're alluding to is
  3086. 2:00:49precisely the direction we're trying to
  3087. 2:00:51develop now and have been for some time
  3088. 2:00:53as a means to complement those
  3089. 2:00:55capabilities and always use the robotic
  3090. 2:00:57capacity up front as the means to inform
  3091. 2:01:00those judgments gentlemen's time is
  3092. 2:01:02expired Mr Lucas you senator
  3093. 2:01:05thank you Mr chairman Mr director down
  3094. 2:01:07at the Smithsonian they have a piece of
  3095. 2:01:09your old equipment hanging for all the
  3096. 2:01:11world to see the X-15 from the 1960s
  3097. 2:01:15which is a symbol of a debate and a
  3098. 2:01:17decision by the generation ahead of you
  3099. 2:01:18and I that in the spirit of satisfying
  3100. 2:01:22the common need of the United States
  3101. 2:01:24Congress and the American people for
  3102. 2:01:25immediate gratification that it was
  3103. 2:01:27better to strap men and women equipment
  3104. 2:01:29on ballistic missiles than it was to
  3105. 2:01:31focus on creating space planes
  3106. 2:01:34your comments today
  3107. 2:01:36you point out about the potential future
  3108. 2:01:38for an orbital space plane and the
  3109. 2:01:40reusable launch vehicles with reasonable
  3110. 2:01:43budget and reasonable Focus how far down
  3111. 2:01:45the road are we talking about before we
  3112. 2:01:48have
  3113. 2:01:48functioning replacement systems like
  3114. 2:01:51that
  3115. 2:01:52well as a budget before the Congress as
  3116. 2:01:55part of the amended fiscal year 03
  3117. 2:01:57proposal the president made last
  3118. 2:01:59November would kind of played a
  3119. 2:02:01technology demonstrator of the orbital
  3120. 2:02:04space plane as early as fiscal year 06
  3121. 2:02:07flight testing and so forth to occur as
  3122. 2:02:11soon as next summer it would lead up to
  3123. 2:02:14that technology demonstrator then from
  3124. 2:02:16there to developing as we've now
  3125. 2:02:18completed the the essential Baseline
  3126. 2:02:21requirements if you will look for
  3127. 2:02:23competing approaches uh not a technology
  3128. 2:02:25demonstrated but an operational vehicle
  3129. 2:02:27that would accomplish the objectives of
  3130. 2:02:29both rescue and return capacity as well
  3131. 2:02:32as transfer to International Space
  3132. 2:02:34Station that would be online we would
  3133. 2:02:36hope as early as the end of this decade
  3134. 2:02:38and we're kind of moving in that
  3135. 2:02:40direction to try to establish that this
  3136. 2:02:42would be a complementary capability to
  3137. 2:02:45the Space Shuttle and use the space
  3138. 2:02:47shuttle primarily as a cargo capacity
  3139. 2:02:49heavy lift ability rather than trying to
  3140. 2:02:52make a vehicle that's all things to all
  3141. 2:02:54requirements this would be a crew
  3142. 2:02:57transfer capability that would be
  3143. 2:02:58maneuverable flexible and responsive to
  3144. 2:03:02those kinds of circumstances where
  3145. 2:03:03needed most booster slash plane or
  3146. 2:03:06two-stage plane director it is initially
  3147. 2:03:09planned as a capability mounted Atop A
  3148. 2:03:12Expendable launch vehicle and that
  3149. 2:03:14technology demonstrator will be that
  3150. 2:03:17initial capability that we will utilize
  3151. 2:03:19at that time
  3152. 2:03:20along that line since it's obvious that
  3153. 2:03:23without amount of effort required and
  3154. 2:03:25the need as you've pointed out so
  3155. 2:03:27consequently to keep the Workhorse the
  3156. 2:03:29old shuttle up and going could you
  3157. 2:03:31address for a moment some of the
  3158. 2:03:32discussion we've had on the committee
  3159. 2:03:34for some time about the effect on the
  3160. 2:03:36reduction in the number of people who
  3161. 2:03:38full-time employees who support the
  3162. 2:03:40shuttle over the last the last decade
  3163. 2:03:42literally what one-third less people
  3164. 2:03:44still making if not the same number of
  3165. 2:03:47but even a greater number of safety
  3166. 2:03:48checks absolutely I think the the
  3167. 2:03:50history appears to suggest and again
  3168. 2:03:53we'll be guided a lot by the the review
  3169. 2:03:55that the investigation board will go
  3170. 2:03:57through in terms of looking at the
  3171. 2:03:58systemic causes of what may have been
  3172. 2:04:00there so their Charter is very Broad and
  3173. 2:04:02their their scope is is rather extensive
  3174. 2:04:04but it would appear as though that the
  3175. 2:04:06the as exactly as you've suggested the
  3176. 2:04:09history is that while cost reductions
  3177. 2:04:11and and efficiencies were gained over
  3178. 2:04:13the course of that period as previously
  3179. 2:04:16described on the slide there were also
  3180. 2:04:18improvements in the safety margins as
  3181. 2:04:22well as the the reduction of incidents
  3182. 2:04:25prior to launch on orbit incidents you
  3183. 2:04:28name it there were all the trends were
  3184. 2:04:30moving in a direction that proved or
  3185. 2:04:32demonstrated uh greater efficiency in
  3186. 2:04:34addition to slide 18 if you will that
  3187. 2:04:38would approve the the capabilities I
  3188. 2:04:40think that have been have significantly
  3189. 2:04:42improved over this span both decreasing
  3190. 2:04:45incidents and increasing efficiencies
  3191. 2:04:46but again all that is is based on the
  3192. 2:04:50the data and the information we see over
  3193. 2:04:52this particular trend line we're going
  3194. 2:04:54to be guided by what the the systemic
  3195. 2:04:56causes are that the investigation board
  3196. 2:04:58may come back and look at for this
  3197. 2:04:59information and say that may or may not
  3198. 2:05:02have been a contributing factor to it
  3199. 2:05:03will be guided by their View
  3200. 2:05:05German's time has expired Mr Lucas
  3201. 2:05:09thank you Mr chairman Mr director down
  3202. 2:05:12at the Smithsonian they have a piece of
  3203. 2:05:13your old equipment hanging for all the
  3204. 2:05:16world to see the X-15 from the 1960s
  3205. 2:05:19which is a symbol of a debate and a
  3206. 2:05:21decision by the generation ahead of you
  3207. 2:05:23and I
  3208. 2:05:24that in the spirit of satisfying the
  3209. 2:05:27common need of the United States
  3210. 2:05:28Congress and the American people for
  3211. 2:05:30immediate gratification that it was
  3212. 2:05:32better to strap men and women equipment
  3213. 2:05:33on ballistic missiles than it was to
  3214. 2:05:36focus on creating space planes
  3215. 2:05:38your comments today
  3216. 2:05:40you point out about the potential future
  3217. 2:05:42for an orbital space plane and the
  3218. 2:05:44reusable launch vehicles with reasonable
  3219. 2:05:47budget and reasonable Focus how far down
  3220. 2:05:50the road are we talking about before we
  3221. 2:05:52have
  3222. 2:05:53functioning replacement systems like
  3223. 2:05:55that
  3224. 2:05:56well as a budget before the Congress as
  3225. 2:05:59part of the amended fiscal Euro 3
  3226. 2:06:02proposal the president made last
  3227. 2:06:03November would contemplate a technology
  3228. 2:06:06demonstrator of the orbital space plane
  3229. 2:06:09as early as fiscal year 06 flight
  3230. 2:06:12testing and so forth to occur as soon as
  3231. 2:06:16next summer it would lead up to that
  3232. 2:06:18technology demonstrator then from there
  3233. 2:06:20to developing as we've now completed the
  3234. 2:06:23the essential Baseline requirements if
  3235. 2:06:26you will look for competing approaches
  3236. 2:06:28uh not a technology demonstrated but an
  3237. 2:06:30operational vehicle that would
  3238. 2:06:32accomplish the objectives of both rescue
  3239. 2:06:34and return capacity as well as transfer
  3240. 2:06:37to International Space Station that
  3241. 2:06:39would be online we would hope as early
  3242. 2:06:41as the end of this decade and we're kind
  3243. 2:06:43of moving in that direction to try to
  3244. 2:06:45establish that this would be a
  3245. 2:06:47complementary capability to the Space
  3246. 2:06:50Shuttle and use the space shuttle
  3247. 2:06:52primarily as a cargo capacity heavy lift
  3248. 2:06:54ability rather than trying to make a
  3249. 2:06:57vehicle that's all things to all
  3250. 2:06:59requirements this would be a crew
  3251. 2:07:01transfer capability that would be
  3252. 2:07:02maneuverable flexible and responsive to
  3253. 2:07:06those kinds of circumstances where
  3254. 2:07:07needed most booster slash plane or
  3255. 2:07:10two-stage plane director it is initially
  3256. 2:07:13planned as a capability mounted Atop A
  3257. 2:07:16Expendable launch vehicle and that
  3258. 2:07:18technology demonstrator will be that
  3259. 2:07:21initial capability that we will utilize
  3260. 2:07:23at that time
  3261. 2:07:24along that line since it's obvious that
  3262. 2:07:27without amount of effort required and
  3263. 2:07:29the need as you've pointed out so
  3264. 2:07:31conseinctly to keep the Workhorse the
  3265. 2:07:33old shuttle up and going could you
  3266. 2:07:35address for a moment some of the
  3267. 2:07:36discussion we've had on the committee
  3268. 2:07:38for some time about the effect on the
  3269. 2:07:40reduction in the number of people who
  3270. 2:07:42full-time employees who support the
  3271. 2:07:45shuttle over the last the last decade
  3272. 2:07:46literally what one-third less people
  3273. 2:07:49still making if not the same number of
  3274. 2:07:51but even a greater number of safety
  3275. 2:07:53checks absolutely I think the the
  3276. 2:07:55history appears to suggest and again
  3277. 2:07:57we'll be guided a lot by the the review
  3278. 2:08:00that the investigation board will go
  3279. 2:08:01through in terms of looking at the
  3280. 2:08:02systemic causes of what may have been
  3281. 2:08:05there so their Charter is very Broad and
  3282. 2:08:07their their scope is is rather extensive
  3283. 2:08:09but it would appear as though that the
  3284. 2:08:11the as exactly as you've suggested the
  3285. 2:08:13history is that while cost reductions
  3286. 2:08:15and and efficiencies were gained over
  3287. 2:08:17the course of that period uh as
  3288. 2:08:19previously described on a slide there
  3289. 2:08:22were also improvements in the safety
  3290. 2:08:25margins as well as the uh the reduction
  3291. 2:08:28of incidents prior to launch on-orbit
  3292. 2:08:31incidents you name it there were all the
  3293. 2:08:33trends were moving in a direction that
  3294. 2:08:35proved or demonstrated greater
  3295. 2:08:38efficiency in addition to slide 18 if
  3296. 2:08:41you will that would approve the the
  3297. 2:08:44capabilities I think that have been have
  3298. 2:08:46significantly improved over this span
  3299. 2:08:48both decreasing incidents and increasing
  3300. 2:08:50efficiencies but again all that is is
  3301. 2:08:53based on the the data and the
  3302. 2:08:55information we see over this particular
  3303. 2:08:57trend line we're going to be guided by
  3304. 2:08:59what the the systemic causes are that
  3305. 2:09:01the investigation board may come back
  3306. 2:09:03and look at for this information and say
  3307. 2:09:04that may or may not have been a
  3308. 2:09:06contributing factor to it we'll be
  3309. 2:09:07guided by their view thank you director
  3310. 2:09:10thank you sir
  3311. 2:09:11Senator boxer
  3312. 2:09:14thank you
  3313. 2:09:16thank you very much
  3314. 2:09:18um
  3315. 2:09:20Mr O'Keefe
  3316. 2:09:22I want to join my colleagues in sending
  3317. 2:09:25condolences to the families and also my
  3318. 2:09:29feelings of
  3319. 2:09:31condolence as well to NASA in California
  3320. 2:09:34where the birthplace of the shuttle
  3321. 2:09:36program we hold a very special place in
  3322. 2:09:39our heart for the heroes who conduct
  3323. 2:09:41these flights and it's in this spirit
  3324. 2:09:44that I ask my questions
  3325. 2:09:46um
  3326. 2:09:47in the year 2000 your safety panel made
  3327. 2:09:50a very clear recommendation I asked
  3328. 2:09:52unanimous consent that I placed this
  3329. 2:09:54page in the record
  3330. 2:09:56I trust without objection that will be
  3331. 2:09:58done
  3332. 2:09:59this is uh a quote the presidential
  3333. 2:10:03commission on the shuttle Challenger
  3334. 2:10:05accident addressed crew escape in their
  3335. 2:10:07report and recommended that NASA make
  3336. 2:10:09all efforts to provide a crew escape
  3337. 2:10:11system
  3338. 2:10:12NASA responded by initiating crew escape
  3339. 2:10:15studies this is in the safety panel then
  3340. 2:10:18it says over the lifetime of the Space
  3341. 2:10:20Shuttle reliable post-launch crew escape
  3342. 2:10:22system will provide the largest
  3343. 2:10:25potential Improvement in crew safety
  3344. 2:10:27NASA has completed or has underway a
  3345. 2:10:30number of studies that also suggests
  3346. 2:10:32such a system is feasible and then they
  3347. 2:10:34say
  3348. 2:10:35the time is past due for the
  3349. 2:10:37implementation of a more capable crew
  3350. 2:10:40escape system
  3351. 2:10:42now Mr O'Keefe after that report was
  3352. 2:10:45filed uh
  3353. 2:10:47members of the safety panel were fired
  3354. 2:10:50and I ask unanimous consent to put in
  3355. 2:10:53the record the New York Times story
  3356. 2:10:54entitled NASA dismissed advisors who
  3357. 2:10:57warned about safety
  3358. 2:10:59Mr chairman will you put that in the
  3359. 2:11:01record for me
  3360. 2:11:02Miss German
  3361. 2:11:05Mr chairman not objection thank you
  3362. 2:11:10um
  3363. 2:11:11and after that report and after the
  3364. 2:11:15people were fired four board members
  3365. 2:11:17were fired two Consultants were fired
  3366. 2:11:19one board member quit because he was
  3367. 2:11:21upset at the firings that left you two
  3368. 2:11:23people
  3369. 2:11:25you changed the charter
  3370. 2:11:27of the panel and I asked unanimous
  3371. 2:11:30consent that the a new Charter in the
  3372. 2:11:32Old Charter be placed in the record
  3373. 2:11:34objection
  3374. 2:11:35and in essence without going through the
  3375. 2:11:38bureaucratic talk in here the new
  3376. 2:11:41Charter Mr O'Keefe gives you much more
  3377. 2:11:44power the NASA administrator not you
  3378. 2:11:47personally
  3379. 2:11:48in this case you personally more power
  3380. 2:11:50to essentially veto who they choose as
  3381. 2:11:54chair of the panel
  3382. 2:11:56so I put all these pieces together Mr
  3383. 2:11:58chairman and I have concern
  3384. 2:12:01I see a report that clearly
  3385. 2:12:04doesn't mince words here the time is
  3386. 2:12:06past due for the implementation of a
  3387. 2:12:08more capable crew escape system
  3388. 2:12:11I see members being fired
  3389. 2:12:14I then see a new Charter where now
  3390. 2:12:16there's less Independence of the safety
  3391. 2:12:19panel
  3392. 2:12:20so I want to know how you feel about
  3393. 2:12:23this array of facts first of all do you
  3394. 2:12:26agree
  3395. 2:12:27that the time is past due for the
  3396. 2:12:29implementation of a more capable crew
  3397. 2:12:31escape system and if you do
  3398. 2:12:34why haven't we seen more done about it
  3399. 2:12:36and number two why do you think those
  3400. 2:12:39folks were fired
  3401. 2:12:41uh and number three would you agree in
  3402. 2:12:44light of your I believe very sincere
  3403. 2:12:47comments that safety is a priority that
  3404. 2:12:50you would go back to the old Charter
  3405. 2:12:52where the panel could choose its own
  3406. 2:12:54leader and not have the NASA
  3407. 2:12:56administrator veto it
  3408. 2:12:59thank you Senator on the first issue as
  3409. 2:13:02it pertains to crew escape again there
  3410. 2:13:04were a series of very important
  3411. 2:13:06recommendations that came from the
  3412. 2:13:08Rogers commission and and then or
  3413. 2:13:10outgrowth of the post-challenger
  3414. 2:13:12experience the changed operational
  3415. 2:13:14procedures as it pertaining to crew uh
  3416. 2:13:17crew escape and capabilities that were
  3417. 2:13:19uh recommended therein and prior to
  3418. 2:13:23launch there is a complete safety regime
  3419. 2:13:25it's in place that didn't exist prior to
  3420. 2:13:27Challenger because of their
  3421. 2:13:28recommendations it's a very significant
  3422. 2:13:31change
  3423. 2:13:32having said that my understanding is
  3424. 2:13:34that the analysis that went on a couple
  3425. 2:13:36three years ago following that
  3426. 2:13:38particular set of reports of the options
  3427. 2:13:40all led to a a series of of technical
  3428. 2:13:45modifications to the shuttle which would
  3429. 2:13:47have increased its weight dramatically
  3430. 2:13:49its operations its maneuverability and
  3431. 2:13:52so therefore we're deemed to be a
  3432. 2:13:54marginal improvements in safety that
  3433. 2:13:56could be attained if at all and yet
  3434. 2:13:59dramatically increase weight which would
  3435. 2:14:01have compromised the safety of on orbit
  3436. 2:14:04so you didn't agree with this
  3437. 2:14:06recommendation I don't know how much
  3438. 2:14:08time has expired well Mr chairman I'm
  3439. 2:14:11just trying to see I'm sorry the general
  3440. 2:14:12woman's time I know that you're sorry I
  3441. 2:14:15know that you're sorry thank you I'm
  3442. 2:14:16sorry Senator no it is my agreement
  3443. 2:14:19notwithstanding or not I I again I'm not
  3444. 2:14:22fully aware of all the parameters of it
  3445. 2:14:24I'm advised that's what led the the
  3446. 2:14:25folks to conclude uh two or three years
  3447. 2:14:28ago having said that we are going to
  3448. 2:14:29look at anything that the investigator
  3449. 2:14:32board comes back with and says these are
  3450. 2:14:34the changes that must be made in order
  3451. 2:14:35to guarantee safe flight operations if
  3452. 2:14:37it intent contains that particular set
  3453. 2:14:39of questions which by the way were
  3454. 2:14:41primarily pertaining to as I understand
  3455. 2:14:43it asset requirements not decent
  3456. 2:14:46capabilities that in turn those kinds of
  3457. 2:14:50requirements be factored in and we make
  3458. 2:14:51the changes appropriate to do so to your
  3459. 2:14:53second Point as it pertains to the
  3460. 2:14:55safety panel board composition it's
  3461. 2:14:58Charter and so forth that occurred prior
  3462. 2:15:01to my tenure I don't know exactly what
  3463. 2:15:03the circumstances were a sort sort of of
  3464. 2:15:07the press accounts and the folklore or
  3465. 2:15:09legend that may have gone into who did
  3466. 2:15:11what to who when
  3467. 2:15:12nonetheless I do understand that in 97
  3468. 2:15:15based on a report from the Inspector
  3469. 2:15:17General at that time offered as how a
  3470. 2:15:20Cadre of panel members with long-term
  3471. 2:15:22experience and in-depth NASA knowledge
  3472. 2:15:24is important but to be most effective
  3473. 2:15:26this group must be routinely infused
  3474. 2:15:29with the fresh perspective of new
  3475. 2:15:30diverse members so as a consequence the
  3476. 2:15:33inspector General's position as I
  3477. 2:15:35understand it was acted upon by my
  3478. 2:15:37predecessor uh suggestions were made as
  3479. 2:15:40to to the Charter to limit the duration
  3480. 2:15:42of
  3481. 2:15:44um the tenure to two terms I believe of
  3482. 2:15:47six years each we'll certainly go back
  3483. 2:15:49and re-examine that if it's the desire
  3484. 2:15:50on the part of the panel members to look
  3485. 2:15:52at a different uh 10-year period of time
  3486. 2:15:54that they think enhances their wisdom
  3487. 2:15:57and understanding of the safety issues I
  3488. 2:15:59am all ears on that the prior chairman
  3489. 2:16:02introduced himself to me within 30 days
  3490. 2:16:05of my arrival at Nasa as the outgoing
  3491. 2:16:08chairman so I don't know how they
  3492. 2:16:09arrived at who was going to become the
  3493. 2:16:12chairman and who'd be the next
  3494. 2:16:13chairperson but the current chair is the
  3495. 2:16:15individual that was anointed and
  3496. 2:16:17appointed I guess by me but with the
  3497. 2:16:20concurrence of the board prior that time
  3498. 2:16:22I made no objection to it and the only
  3499. 2:16:24individual that is new to the board is
  3500. 2:16:26one individual is added to it during the
  3501. 2:16:28course of my tenure no one else has been
  3502. 2:16:30released so I've really been trying to
  3503. 2:16:31look at what the composition of the
  3504. 2:16:33panel is and assure its advisory status
  3505. 2:16:37that's the strongest we can possibly
  3506. 2:16:38make it and changes made prior to that
  3507. 2:16:41we'll certainly go back and revisit to
  3508. 2:16:43assure that if they have different views
  3509. 2:16:45that would enhance or strengthen their
  3510. 2:16:47position that's what we want to hear we
  3511. 2:16:49want to make sure that safety of
  3512. 2:16:50operations adhere too at all times thank
  3513. 2:16:52you very much Mr Udall could I could I
  3514. 2:16:54just say I want to apologize to all
  3515. 2:16:55members for enforcing the time limits
  3516. 2:16:58here we do have such a large number of
  3517. 2:17:00questioners and I'm
  3518. 2:17:02members have been very patient and I
  3519. 2:17:04appreciate that Mr Udall thank you Mr
  3520. 2:17:06chairman I too want to thank Mr Keith
  3521. 2:17:09for taking his time to join us today and
  3522. 2:17:11I found your testimony insightful
  3523. 2:17:13enlightening and in fact quite moving I
  3524. 2:17:15want to thank you for your leadership
  3525. 2:17:18um I know you're beginning to think
  3526. 2:17:20you're in an echo chamber but I did also
  3527. 2:17:21want to associate myself with the
  3528. 2:17:23remarks of our chairman on the house
  3529. 2:17:24side and the ranking member and others
  3530. 2:17:26who verged you to create as an
  3531. 2:17:29independent commission as possible and
  3532. 2:17:31that we'll all be well served when those
  3533. 2:17:34results are announced yes sir in my
  3534. 2:17:37experience
  3535. 2:17:38in my previous careers an outdoor
  3536. 2:17:40educator and someone who's very involved
  3537. 2:17:42in the climbing and mountaineering
  3538. 2:17:44communities we found that when we had
  3539. 2:17:45accidents that independent uh entities
  3540. 2:17:48that had no fiduciary relationship or
  3541. 2:17:51other relationship with those involved
  3542. 2:17:52could make a quite accurate in
  3543. 2:17:55objective determinations of what
  3544. 2:17:58occurred so I want to lend my voice to
  3545. 2:17:59those of others here
  3546. 2:18:01I did also want to acknowledge the
  3547. 2:18:04tremendous sacrifice and The Bravery of
  3548. 2:18:06our astronauts and send my condolences
  3549. 2:18:10to the family members and Friends of the
  3550. 2:18:13Brave astronauts we've in Colorado have
  3551. 2:18:16a proud history of involvement with with
  3552. 2:18:19NASA in fact kalpana chawla was one of
  3553. 2:18:22the members of the crew and she was a
  3554. 2:18:24graduate of the University of Colorado
  3555. 2:18:26so we feel that loss very deeply in in
  3556. 2:18:29Colorado
  3557. 2:18:31uh Mr chairman if I might I'd like to
  3558. 2:18:32include in the record
  3559. 2:18:34an article from from The New York Times
  3560. 2:18:36on Monday February 10th that uh talks
  3561. 2:18:40about all the tremendous benefits that
  3562. 2:18:41have been generated by the space program
  3563. 2:18:43I know there are some without objections
  3564. 2:18:45though thank you there have been debates
  3565. 2:18:48and discussions uh and comments that the
  3566. 2:18:50astronauts were involved in the minor
  3567. 2:18:53science projects while they were
  3568. 2:18:55orbiting the Earth and I think if you
  3569. 2:18:58look into the record uh in fact what's
  3570. 2:19:01resulted from our space program is truly
  3571. 2:19:03remarkable and day in and day out we see
  3572. 2:19:05the results of those advancements here
  3573. 2:19:07on here on Earth
  3574. 2:19:10um if I could I'd like to
  3575. 2:19:12focus a little bit on the space shuttle
  3576. 2:19:14Orbiter and whether we ought to replace
  3577. 2:19:16it do you have you gotten to the point
  3578. 2:19:19where you have an opinion in that regard
  3579. 2:19:20about the replacement
  3580. 2:19:22of the Space Shuttle Orbiter yes sir the
  3581. 2:19:25the integrated space Transportation plan
  3582. 2:19:27that we're currently working with was
  3583. 2:19:31devised over the course of last year and
  3584. 2:19:33culminating in the November 13 2002
  3585. 2:19:36amendment that the president submitted
  3586. 2:19:38to the 2003 budget that when the
  3587. 2:19:40Congress is still deliberating on at
  3588. 2:19:42this time it's reinforced in the 2004
  3589. 2:19:44budget submission the president made
  3590. 2:19:46last Monday which is to look at all the
  3591. 2:19:49elements of how these particular systems
  3592. 2:19:51support each other I think for for a
  3593. 2:19:53long time the in all the trends seem to
  3594. 2:19:56suggest that every one of these were
  3595. 2:19:57looked at as individual Standalone
  3596. 2:19:58programs but there's a great inner
  3597. 2:20:00relationship between them and the
  3598. 2:20:02requirement for Space Shuttle
  3599. 2:20:04capabilities both in terms of crew
  3600. 2:20:06transfer which is how we typically have
  3601. 2:20:10rotated the crews aboard the internet
  3602. 2:20:12National Space Station as well as the
  3603. 2:20:14launch of cargo Assets in other words
  3604. 2:20:17all the the new pieces that are being
  3605. 2:20:19installed on International Space Station
  3606. 2:20:20to build out that laboratory that can't
  3607. 2:20:23be duplicated here on Earth is a
  3608. 2:20:25capability we've really got to look at
  3609. 2:20:26in relationship to each other
  3610. 2:20:28and to consider a crew transfer and
  3611. 2:20:31rescue return capacity that can be
  3612. 2:20:34introduced more aggressively than we
  3613. 2:20:36presently have so the combination of
  3614. 2:20:38both shuttle and how we maintain its
  3615. 2:20:42cargo lift capacity for capabilities to
  3616. 2:20:44continue to not only support but finish
  3617. 2:20:46building the International Space Station
  3618. 2:20:48the capability to transfer a crew in
  3619. 2:20:50order to rotate the Expedition cruise
  3620. 2:20:52that we've seen now in our here we are
  3621. 2:20:54in our third year of permanent presence
  3622. 2:20:56on board that system as well as the
  3623. 2:20:59orbital space plane that would provide
  3624. 2:21:01that capability all three of those
  3625. 2:21:03dimensions and then the next Generation
  3626. 2:21:05launch Technologies to ultimately
  3627. 2:21:07replace the cargo capacity is our focus
  3628. 2:21:09in that Amendment as well as in the
  3629. 2:21:12present budget before the Congress right
  3630. 2:21:13now Mr chairman I don't know where my
  3631. 2:21:15time is but this what is the status of
  3632. 2:21:17the Orbiter over time is expired Senator
  3633. 2:21:19Wyden thank you Mr chairman
  3634. 2:21:21administrator O'Keefe when I chaired
  3635. 2:21:23your confirmation hearings I found you
  3636. 2:21:25to be honest and candid and we're going
  3637. 2:21:27to need an awful lot of that in the days
  3638. 2:21:28ahead and appreciate your being here my
  3639. 2:21:31first question deals with the huge brain
  3640. 2:21:33drain situation at Nasa it seems to me
  3641. 2:21:37that you all are hemorrhaging talent in
  3642. 2:21:39key areas like electrical engineering
  3643. 2:21:41and I think this has implications both
  3644. 2:21:44for the short term and the long term the
  3645. 2:21:48February first date for example on that
  3646. 2:21:50date you all were being pushed to in
  3647. 2:21:53effect use more outside contractors and
  3648. 2:21:56fewer people within the agency and so
  3649. 2:22:00some of course are saying that when we
  3650. 2:22:03have a chance to study this is going to
  3651. 2:22:05come back to people so I'd like you to
  3652. 2:22:08comment on the brain drain problem both
  3653. 2:22:10from the short term and the long term
  3654. 2:22:13and what's being done to address it
  3655. 2:22:17thank you Senator indeed that is a
  3656. 2:22:18concern that as we've discussed
  3657. 2:22:21previously as well as we've talked about
  3658. 2:22:22in various hearings that we've over the
  3659. 2:22:26course of the last dozen years or so
  3660. 2:22:27we've seen a very clear Trend in the
  3661. 2:22:30direction of an aging Workforce that are
  3662. 2:22:33capable very strong professionals but it
  3663. 2:22:36is nonetheless a very mature Workforce
  3664. 2:22:38we've got three times as many scientists
  3665. 2:22:40and Engineers that are over 60 as we
  3666. 2:22:42have under 30. and so the the
  3667. 2:22:44consequence of that set of decisions
  3668. 2:22:46made and Years Gone by of bringing in
  3669. 2:22:49additional Talent at gradations there's
  3670. 2:22:52no way to instantly grow
  3671. 2:22:55longevity as well as experience base
  3672. 2:22:58what we submitted last June uh to the
  3673. 2:23:01Congress was a series of legislative
  3674. 2:23:03initiatives specifically focused on
  3675. 2:23:05strategic management of human capital as
  3676. 2:23:08has been advised by the general
  3677. 2:23:09Accounting Office Dave Walker is the
  3678. 2:23:11Controller General has consistently
  3679. 2:23:13talked about this so we forwarded a
  3680. 2:23:15series of legislative Provisions that
  3681. 2:23:16have been sent to the Congress there are
  3682. 2:23:18any appropriate Committees of
  3683. 2:23:19jurisdiction or under consideration to
  3684. 2:23:21try to deal with what those tools would
  3685. 2:23:23be that we could use for the purpose of
  3686. 2:23:25knowing retaining for the near-term
  3687. 2:23:27period the kinds of capabilities and
  3688. 2:23:29talent we have today but also recruiting
  3689. 2:23:31Talent with some experience based from a
  3690. 2:23:34variety of walks and backgrounds as well
  3691. 2:23:37as bringing in new
  3692. 2:23:39graduate students and and doctoral
  3693. 2:23:41students who would replace that roughly
  3694. 2:23:4360 percent of the workforce that is of
  3695. 2:23:46scientific and Technical background
  3696. 2:23:47you're exactly right it's a concern and
  3697. 2:23:49we want to act I want to ask we look
  3698. 2:23:51forward to the congress's early
  3699. 2:23:52enactment of all those Provisions to to
  3700. 2:23:54move us along that way I want to ask one
  3701. 2:23:56other quick question I I think when we
  3702. 2:23:58get to the bottom of this I think we're
  3703. 2:23:59going to see that we've got to address
  3704. 2:24:01this issue and I just pray that this
  3705. 2:24:04tragic loss hasn't been due to some her
  3706. 2:24:07human error the second question I had
  3707. 2:24:09deals with man versus unmanned space
  3708. 2:24:12flight I think that manned flights
  3709. 2:24:14represent the aspirations and hopes of
  3710. 2:24:17so many Americans but I will tell you I
  3711. 2:24:20personally believe we're going to need
  3712. 2:24:21to do more in the unmanned area I think
  3713. 2:24:25it is going to be an imperative in the
  3714. 2:24:28days ahead and I'd like your judgment as
  3715. 2:24:31to how to make that call for example I'm
  3716. 2:24:34attracted to the argument that when
  3717. 2:24:36you're talking about the space station a
  3718. 2:24:38few hundred miles you know up that
  3719. 2:24:41wouldn't be as high a priority as really
  3720. 2:24:43looking to Distant Worlds but I'd be
  3721. 2:24:46curious how you'd go about tackling this
  3722. 2:24:49question of making the tough calls with
  3723. 2:24:51respect to manned versus unmanned I want
  3724. 2:24:55to see the manned Expeditions go forward
  3725. 2:24:57I do think we're going going to have to
  3726. 2:24:59have a bigger role for unmanned
  3727. 2:25:01Expeditions in the days ahead and I'd
  3728. 2:25:03like to hear you tell us how you go
  3729. 2:25:04about making those calls yes sir thank
  3730. 2:25:06you Senator I think that's a you've hit
  3731. 2:25:08the nail around the head we the strategy
  3732. 2:25:10we've tried to employ here again is not
  3733. 2:25:12an either or but very much a a
  3734. 2:25:14combination of how do you best employ
  3735. 2:25:16the robotic capabilities that we have to
  3736. 2:25:19advance our knowledge base and
  3737. 2:25:21understand what the challenges will be
  3738. 2:25:23in order to assure the greatest
  3739. 2:25:25probability of safety of flight
  3740. 2:25:27operations when and if called upon to
  3741. 2:25:31engage humans in that science and
  3742. 2:25:33research set of objectives and so the
  3743. 2:25:36approach that we've devised I think for
  3744. 2:25:38example in the case of the the Mars uh
  3745. 2:25:41Landers that are planned and explorers
  3746. 2:25:43that are planned for later this year to
  3747. 2:25:45do to arrive there in early 04 is to
  3748. 2:25:50continue to build that knowledge base
  3749. 2:25:51understanding the challenges and
  3750. 2:25:53difficulties we will work with and the
  3751. 2:25:55Inhibitors on exploration much Beyond
  3752. 2:25:59where we are today typically are human
  3753. 2:26:01related to be sure but it's partly
  3754. 2:26:03technology related the first one is that
  3755. 2:26:06that our limitations on capacity for
  3756. 2:26:09propulsion speed to get anywhere is
  3757. 2:26:12currently restricted by the same laws of
  3758. 2:26:14physics we've been living with for 40
  3759. 2:26:15years and so as a resultant two we
  3760. 2:26:17developed an in-space propulsion
  3761. 2:26:18capacity to dramatically reduce the time
  3762. 2:26:21as well as the capacity to get anywhere
  3763. 2:26:24we're going to be really restricted in
  3764. 2:26:26terms of the the capabilities we have in
  3765. 2:26:29that regard the second is is how to
  3766. 2:26:31assure that humans survive the
  3767. 2:26:32experience and as it stands now the
  3768. 2:26:35exposure that we see and what we're
  3769. 2:26:37learning on International Space Station
  3770. 2:26:38as a consequence of long duration space
  3771. 2:26:40flight or the debilitating effects on
  3772. 2:26:43human beings of space travel and space
  3773. 2:26:45exploration
  3774. 2:26:46we're looking to conquer those part of
  3775. 2:26:48the budget proposal you have before you
  3776. 2:26:49as part of the 04 submission that the
  3777. 2:26:52president just made is an intensive
  3778. 2:26:54effort to look at human factors and only
  3779. 2:26:56then after we've conquered those kinds
  3780. 2:26:58of of challenges of degradation of
  3781. 2:27:01muscle mass bone mass radiation effects
  3782. 2:27:04all those things should we venture much
  3783. 2:27:06Beyond where we have the capacity to do
  3784. 2:27:09today which is a very important pursuit
  3785. 2:27:12of science and research aboard station
  3786. 2:27:13and other objectives so this is whole
  3787. 2:27:16the whole strategy here is to lay this
  3788. 2:27:18out in a way that informs the knowledge
  3789. 2:27:20Base by robotic capabilities follow
  3790. 2:27:22along to the extent necessary and win
  3791. 2:27:24human intervention gives us the
  3792. 2:27:26opportunity to expand that knowledge
  3793. 2:27:27base and make sure they can only do it
  3794. 2:27:29when there's a safety of flight
  3795. 2:27:31capability that we can assure thank
  3796. 2:27:33chairman well thank you Senator
  3797. 2:27:34appreciate it very much
  3798. 2:27:36thank you Mr chairman administrator
  3799. 2:27:38O'Keefe thank you for coming and I have
  3800. 2:27:40the highest confidence in your
  3801. 2:27:41leadership as I do an admiral Gay Men's
  3802. 2:27:44Leadership who did an outstanding job in
  3803. 2:27:46investigating the USS Cole I have a very
  3804. 2:27:49specific series of questions that you
  3805. 2:27:52may not be able to answer here but I
  3806. 2:27:54would like a thorough response for the
  3807. 2:27:55record relative to one aspect of the
  3808. 2:27:59operations of the shuttle and it deals
  3809. 2:28:01with the tiles
  3810. 2:28:02the um
  3811. 2:28:04the tiles uh are glued to the shuttle by
  3812. 2:28:07a special adhesive
  3813. 2:28:09that adhesive has its primary component
  3814. 2:28:13urea
  3815. 2:28:14the urea that's produced is produced
  3816. 2:28:16around the world and much of its for
  3817. 2:28:18agriculture and Industrial purposes
  3818. 2:28:21but the specific urea that NASA has used
  3819. 2:28:24for the glue for the tiles was produced
  3820. 2:28:27by one plant
  3821. 2:28:29and that one plant was in Fort
  3822. 2:28:31Saskatchewan Alberta Canada
  3823. 2:28:34and the reason why that plant was
  3824. 2:28:36selected was because none of the U.S
  3825. 2:28:39manufacturers were able to meet the very
  3826. 2:28:42stringent requirements that NASA had
  3827. 2:28:44established for the urea for the glue
  3828. 2:28:47for the tiles
  3829. 2:28:49about five years ago that plant was
  3830. 2:28:52acquired by another Canadian firm
  3831. 2:28:54that does business in Cuba
  3832. 2:28:57and because of that they were concerned
  3833. 2:28:59about the implications of Helm's Burton
  3834. 2:29:02legislation
  3835. 2:29:03and so they no longer supplied NASA the
  3836. 2:29:06urea for the glue for the tiles
  3837. 2:29:09the U.S manufacturer of the adhesive
  3838. 2:29:12that used that specific urea was very
  3839. 2:29:15concerned at the time about finding a
  3840. 2:29:18new source of urea that would meet the
  3841. 2:29:20very specific tough requirements that
  3842. 2:29:23NASA had for the glue to hold the tiles
  3843. 2:29:26on
  3844. 2:29:27and I would say there are millions of
  3845. 2:29:28tons of urea consuming the U.S every
  3846. 2:29:30year but only a very very small portion
  3847. 2:29:33of it would be used specifically by NASA
  3848. 2:29:36for the glue for the tiles and as I said
  3849. 2:29:39before up until that that takeover five
  3850. 2:29:44years ago it was from one plant in
  3851. 2:29:47Canada that had a separate mechanism for
  3852. 2:29:49producing that urea that U.S
  3853. 2:29:51manufacturers did not or perhaps could
  3854. 2:29:54not achieve the same quality standards
  3855. 2:29:56that NASA required
  3856. 2:29:58so what my concern is whether or not we
  3857. 2:30:01found an equally reliable supplier of
  3858. 2:30:04urea and for the record I'd like to give
  3859. 2:30:06give us that information relative to the
  3860. 2:30:09specifics of NASA specifications thank
  3861. 2:30:11you yes sir no I I uh I don't know I
  3862. 2:30:15really am not aware of the the nuances
  3863. 2:30:17there but I positively will provide that
  3864. 2:30:19for record thank you sir
  3865. 2:30:21thank you Mr chairman
  3866. 2:30:24Senator snow thank you Mr chairman and
  3867. 2:30:27welcome to Mr O'Keefe I know this is a
  3868. 2:30:30very trying time for you and the NASA
  3869. 2:30:32family and most certainly the families
  3870. 2:30:35of the astronauts and it just reminds us
  3871. 2:30:38how fortunate we are as a nation to have
  3872. 2:30:40been blessed with men and women like
  3873. 2:30:43these astronauts who are willing to take
  3874. 2:30:44risks for this this country
  3875. 2:30:47I'm trying to get at the picture of how
  3876. 2:30:51NASA approaches certain decisions what
  3877. 2:30:53is minimized what is discounted uh we
  3878. 2:30:55know that for 12 days from the time that
  3879. 2:30:58you all learned the debris that hit uh
  3880. 2:31:02this shuttle uh and when the shuttle was
  3881. 2:31:04scheduled to land no action was taken
  3882. 2:31:07other than doing some computer model
  3883. 2:31:09simulations to predict damage
  3884. 2:31:13and to rely on past experiences where
  3885. 2:31:16shuttles had returned safely even though
  3886. 2:31:18there had been several Stanford studies
  3887. 2:31:21in 1990 and 1994 that had already warned
  3888. 2:31:24of some potential damage that a single
  3889. 2:31:27piece of debris could have had on the
  3890. 2:31:29tiles
  3891. 2:31:31could you tell me as to why
  3892. 2:31:34no request was made for military
  3893. 2:31:38telescope Imaging we know that a camera
  3894. 2:31:41was not working at the time of orbit
  3895. 2:31:44that really could have shown the damage
  3896. 2:31:48that was done on the underside of the
  3897. 2:31:50shuttle why wasn't that requested at
  3898. 2:31:53some point in time during the flight to
  3899. 2:31:57do a greater examination of this type of
  3900. 2:32:01damage rather than relying on computer
  3901. 2:32:04modeling
  3902. 2:32:06on something you really didn't know what
  3903. 2:32:08had happened rather than doing the
  3904. 2:32:11modeling on something that you knew had
  3905. 2:32:13happened
  3906. 2:32:14and thank you Senator the the
  3907. 2:32:16investigative uh process and certainly
  3908. 2:32:19the the game and board if they come to
  3909. 2:32:21find we should have done something else
  3910. 2:32:23positively we'll be you know Guided by
  3911. 2:32:25that particular finding nonetheless the
  3912. 2:32:27the approach that was
  3913. 2:32:29taken here is this is a a piece of foam
  3914. 2:32:33material that was about a foot and a
  3915. 2:32:35half by six inches
  3916. 2:32:36of which there have been incidents like
  3917. 2:32:39this before
  3918. 2:32:40and as I mentioned earlier there are
  3919. 2:32:42cases where after the flight there's a
  3920. 2:32:45full examination of every square inch
  3921. 2:32:47every single element of the Orbiter when
  3922. 2:32:49it comes back to see what the damage
  3923. 2:32:52effect was it was determined in previous
  3924. 2:32:54cases of comparable circumstance not to
  3925. 2:32:57have been a safety of flight
  3926. 2:32:58consideration
  3927. 2:33:00there is again the the circumstances
  3928. 2:33:03here were it came off of the external
  3929. 2:33:06tank
  3930. 2:33:07um as the as the entire shuttle Orbiter
  3931. 2:33:10system was traveling at 3 600 miles an
  3932. 2:33:13hour
  3933. 2:33:13uh the piece came off dropped roughly 40
  3934. 2:33:16feet at us at a rate of something like
  3935. 2:33:2050 miles an hour so it's the functional
  3936. 2:33:22equivalent as one astronaut described to
  3937. 2:33:24me of a styrofoam cooler blowing off of
  3938. 2:33:27a pickup truck ahead of you on a highway
  3939. 2:33:29and every incident would seem before
  3940. 2:33:32that every model we ran every analysis
  3941. 2:33:34that had been done on every prior case
  3942. 2:33:36demonstrated no significant damage in
  3943. 2:33:39that circumstance they were of the 4 000
  3944. 2:33:42sensors aboard the the shuttle Orbiter
  3945. 2:33:44none of them indicated any anomalies
  3946. 2:33:47during that 16-day flight and given the
  3947. 2:33:49wide variation of heat of several
  3948. 2:33:52hundred degrees that was experienced 16
  3949. 2:33:54times a day if there was any penetration
  3950. 2:33:57any damage that could have been evident
  3951. 2:33:59the the Assumption was Those sensors
  3952. 2:34:02would have picked it up nonetheless if
  3953. 2:34:04the gaming board finds that we really
  3954. 2:34:06aired by not examining this and yet
  3955. 2:34:09another Direction based on all the
  3956. 2:34:11historical evidence we positively will
  3957. 2:34:13run on that finding the ground and make
  3958. 2:34:15corrective actions as necessary but
  3959. 2:34:17wasn't this piece of debris the largest
  3960. 2:34:21documented piece ever to hit the shuttle
  3961. 2:34:24not to my knowledge but I will correct
  3962. 2:34:25that for the record if that proves to be
  3963. 2:34:27an error I I don't know whether that's
  3964. 2:34:29true or not but I certainly will provide
  3965. 2:34:31that for the record I guess the sign of
  3966. 2:34:34the senator is up I'm sorry Mr Wu
  3967. 2:34:40during my colleague's questions I took
  3968. 2:34:43the liberty of drawing up a little
  3969. 2:34:45diagram to illustrate my inquiry to you
  3970. 2:34:48it's not a PowerPoint presentation it's
  3971. 2:34:50just felt tip pen on a peachy
  3972. 2:34:53um across the bottom here cuts
  3973. 2:34:57in your budget and going up risk and the
  3974. 2:35:01red line is the typical hockey puck kind
  3975. 2:35:04of curve that some of us in high tech
  3976. 2:35:06like to see in financial returns but we
  3977. 2:35:08don't like to see in in this kind of
  3978. 2:35:10context
  3979. 2:35:12and earlier I heard you say that you are
  3980. 2:35:16pounding out as much as much of the risk
  3981. 2:35:18as possible before each and every
  3982. 2:35:21shuttle launch
  3983. 2:35:22but we also have a history of delayed
  3984. 2:35:27improvements perhaps delayed in future
  3985. 2:35:29generations of craft which may be safer
  3986. 2:35:32and I am concerned that the tragic loss
  3987. 2:35:35of Seven astronauts tells us that we are
  3988. 2:35:38somewhere out on this leg of the curve
  3989. 2:35:40and not somewhere here during you know
  3990. 2:35:44in the flatter portion
  3991. 2:35:46it's our job to try to set policies
  3992. 2:35:50which maintain reasonable safety a job
  3993. 2:35:52which we share with you
  3994. 2:35:55you are a very good team player
  3995. 2:35:57um you should be but in response to
  3996. 2:36:00specific Congressional inquiry I think
  3997. 2:36:02that you are free to answer those
  3998. 2:36:04inquiries
  3999. 2:36:06and I I want to make this a standing
  4000. 2:36:10Congressional inquiry if you will that
  4001. 2:36:13whatever the optimal budget is
  4002. 2:36:16as we are adjusting that budget
  4003. 2:36:19can you work with us to find that
  4004. 2:36:22inflection point I'm concerned that we
  4005. 2:36:25have gone past that inflection point and
  4006. 2:36:27risk where the risk has become
  4007. 2:36:29unacceptably High it is always going to
  4008. 2:36:32be inherently risky to put human beings
  4009. 2:36:34in space I'm a strong supporter of human
  4010. 2:36:36space exploration
  4011. 2:36:38but I want to invite you to work with us
  4012. 2:36:42to find some reasonable point in here
  4013. 2:36:44where we are not expending exceptional
  4014. 2:36:47resources or unnecessarily expending
  4015. 2:36:49resources but we are doing everything
  4016. 2:36:52reasonable to keep humans safe in space
  4017. 2:36:55sure no absolutely Congressman I'm
  4018. 2:36:57delighted to uh to work with you to try
  4019. 2:37:00to find what that break point is and
  4020. 2:37:03again my appreciation if you get turnt
  4021. 2:37:05slide 18 again please uh is that over
  4022. 2:37:09the course of time we've seen a
  4023. 2:37:11reduction in cost of of activities there
  4024. 2:37:14is at the same time been an improvement
  4025. 2:37:16in efficiencies and as well as the the
  4026. 2:37:20reduction of in-flight anomalies
  4027. 2:37:22technical scrubs have dropped by a lot
  4028. 2:37:25uh all of the basic factors that would
  4029. 2:37:28drive you to conclude that as your chart
  4030. 2:37:30suggests as you reduce resources you
  4031. 2:37:32should see an enhancement of risk if
  4032. 2:37:35anything what appears to suggest here is
  4033. 2:37:38a k where efficiencies have been
  4034. 2:37:39attained and risk has been reduced so to
  4035. 2:37:42the extent there's there are differences
  4036. 2:37:44of view about that over the course of
  4037. 2:37:46this past decade of whether or not that
  4038. 2:37:48is the contributing factor to it we
  4039. 2:37:50really are looking forward to to trying
  4040. 2:37:52to determine how to correct that and if
  4041. 2:37:54we've crossed that threshold I think you
  4042. 2:37:56so eloquently alluded to we really ought
  4043. 2:37:59to figure out exactly where we make
  4044. 2:38:00those adjustments as necessary but the
  4045. 2:38:03trends are the things that I think we
  4046. 2:38:04needed to analyze here as well as just
  4047. 2:38:06the basic Theory I think that you've
  4048. 2:38:08Advanced which is a sound one
  4049. 2:38:10I drew it in this way because if you
  4050. 2:38:14have effectively reduced cost and
  4051. 2:38:16reduced risk you've shifted this curve
  4052. 2:38:19to the left or to the right up or down
  4053. 2:38:21or diagonally but the curve is still
  4054. 2:38:23there that's right if you if you make
  4055. 2:38:26these assumptions that Central Point can
  4056. 2:38:28be statistically determined and I just
  4057. 2:38:30want to invite you as this curve shifts
  4058. 2:38:32as policy shift to help us look for this
  4059. 2:38:34curve you and I have been in this
  4060. 2:38:36discussion before about the worthiness
  4061. 2:38:38of human space flight and I want to
  4062. 2:38:40remind you of our conversation that
  4063. 2:38:42Lewis and Clark went West 200 years ago
  4064. 2:38:45they got an appropriation of two
  4065. 2:38:47thousand five hundred dollars they spent
  4066. 2:38:48thirty eight thousand dollars and that
  4067. 2:38:51caused President Jefferson a lot of
  4068. 2:38:52Heartache but that turned out to be a
  4069. 2:38:54pretty good deal for America in the long
  4070. 2:38:56term and I would just encourage you to
  4071. 2:39:00aggressively ask for what you need and
  4072. 2:39:03to keep the Explorers safe gentlemen's
  4073. 2:39:05time has inspired thank you Mr chairman
  4074. 2:39:07thank you Mr Wu Senator Burns
  4075. 2:39:12we need you on Appropriations
  4076. 2:39:20David
  4077. 2:39:23Mr O'Keefe I wish we were meeting under
  4078. 2:39:25different circumstances but we are not
  4079. 2:39:27and my question is a general question
  4080. 2:39:29because
  4081. 2:39:31I was um
  4082. 2:39:33pretty close to the um
  4083. 2:39:35the negotiations of the International
  4084. 2:39:37Space Station and the agreement that we
  4085. 2:39:39signed with with Russia
  4086. 2:39:42and at that time I asked a question that
  4087. 2:39:45we really didn't pursue for some reason
  4088. 2:39:49or other
  4089. 2:39:50I think it would help this committee
  4090. 2:39:54if
  4091. 2:39:57as you know we look at programs and the
  4092. 2:40:00infrastructure that it takes to carry
  4093. 2:40:02those programs out
  4094. 2:40:05at the time we built the the Orbiter
  4095. 2:40:12was there any estimates of what every
  4096. 2:40:17program goes to is there is a point of
  4097. 2:40:19diminishing returns
  4098. 2:40:22whenever upgrades
  4099. 2:40:25are not are not sufficient
  4100. 2:40:29to carry out the mission
  4101. 2:40:32and I'm wondering if if any estimates
  4102. 2:40:35early on in this in this program were
  4103. 2:40:39made by Engineers of what what point do
  4104. 2:40:43we write do we do we come to a point of
  4105. 2:40:45diminishing returns
  4106. 2:40:48and if we look at that and then and I
  4107. 2:40:50know programs change and missions change
  4108. 2:40:54uh and if history tells us anything
  4109. 2:40:57we should be looking at at those kind of
  4110. 2:41:01things in order to change the way
  4111. 2:41:05Congress should be shouldering its
  4112. 2:41:08responsibility sir
  4113. 2:41:11um and um and I would just ask if if
  4114. 2:41:14there are any research could be done in
  4115. 2:41:16your records
  4116. 2:41:18of when do we reach that point
  4117. 2:41:21did we reach that point
  4118. 2:41:23and what was and and as programs change
  4119. 2:41:26what is being dictated in the future if
  4120. 2:41:30if if this equipment is going to be
  4121. 2:41:32asked to do things maybe it was never
  4122. 2:41:36intended to do
  4123. 2:41:39um I'm look I'm I'm not going to go over
  4124. 2:41:41the past because I've been intimately
  4125. 2:41:43involved with it
  4126. 2:41:45and no other program
  4127. 2:41:47stimulates the Curiosity or the interest
  4128. 2:41:49in our sciences and our mathematics in
  4129. 2:41:52our schools like this particular agency
  4130. 2:41:54of the United States government
  4131. 2:41:57and so I deem it very very important
  4132. 2:42:01but if we could have a history
  4133. 2:42:04and see the things that we can do and
  4134. 2:42:07then you do what you do best we may have
  4135. 2:42:10to call on our older end of the
  4136. 2:42:12engineers so to speak
  4137. 2:42:15to make those determinations
  4138. 2:42:17but I think it would help us a lot
  4139. 2:42:20if if we could if we could reach it back
  4140. 2:42:22there and look at history
  4141. 2:42:25take a look what happened
  4142. 2:42:27and then make some decisions to enable
  4143. 2:42:29you we don't want to see this happen
  4144. 2:42:31again but we know that we know that this
  4145. 2:42:33goes we know this this will happen
  4146. 2:42:36accidents will happen as especially in
  4147. 2:42:38the area going into the unknown
  4148. 2:42:41um and I thank you for being here today
  4149. 2:42:43and and some explanation we've reached
  4150. 2:42:45today I'm looking for history something
  4151. 2:42:47that we base policy on into the future
  4152. 2:42:50upon your recommendations no thank you
  4153. 2:42:53senator be delighted to uh to provide
  4154. 2:42:55that we'll go through that
  4155. 2:42:56uh consideration there's no question
  4156. 2:42:58that as it pertains to current flight
  4157. 2:43:01operations I want to reiterate we have a
  4158. 2:43:04a culture that is just obsessing over
  4159. 2:43:07not letting anything go until it's all
  4160. 2:43:10exactly right if the investigation board
  4161. 2:43:13founds it systemically we have failed in
  4162. 2:43:16that Quest that's precisely we'll be
  4163. 2:43:18guided by as well but your point is very
  4164. 2:43:19well taken I think we've got to really
  4165. 2:43:21be thinking seriously about you know
  4166. 2:43:23where is that stage where we really make
  4167. 2:43:25those decisions and I think we'll
  4168. 2:43:26provide that for sure I'll work through
  4169. 2:43:28that analysis and uh and provide for the
  4170. 2:43:31record as well I thank you for your
  4171. 2:43:32leadership and I I appreciate your
  4172. 2:43:34celebration thank you Senator appreciate
  4173. 2:43:36it very much thank you very much we're
  4174. 2:43:37going to take a brief five minute break
  4175. 2:43:39five minutes only then we're right back
  4176. 2:43:41and when we come back Mr nethercutt
  4177. 2:43:43starts the questioning
  4178. 2:43:45thank you
  4179. 2:43:53[Music]
  4180. 2:43:56we'll talk about the shuttle Columbia
  4181. 2:43:58investigation on tomorrow morning's
  4182. 2:44:00Washington Journal as we're joined by
  4183. 2:44:01the chairman and ranking member of the
  4184. 2:44:03House space sub committee Dana
  4185. 2:44:05rohrabacher and Bart Gordon
  4186. 2:44:07then it's on to policy towards Iraq with
  4187. 2:44:10commentary from former Senator and 1972
  4188. 2:44:13Democratic presidential candidate George
  4189. 2:44:15McGovern
  4190. 2:44:16and later Weekly Standard publisher
  4191. 2:44:18William Crystal
  4192. 2:44:19plus your phone calls and a look at the
  4193. 2:44:21day's headlines it's all live starting
  4194. 2:44:23at 7 A.M Eastern here on C-Span
  4195. 2:44:26and check our website for more about the
  4196. 2:44:28space shuttle Columbia read President
  4197. 2:44:30Bush's Proclamation honoring the shuttle
  4198. 2:44:32astronauts
  4199. 2:44:33also find links to help you follow the
  4200. 2:44:35story as investigators continue to try
  4201. 2:44:38to determine what destroyed the Orbiter
  4202. 2:44:39a little more than a week ago
  4203. 2:44:42just point your browser to c-span.org
  4204. 2:44:45[Music]
  4205. 2:44:51more from the hearing on NASA and the
  4206. 2:44:54shuttle in just a moment
  4207. 2:44:56if you missed the beginning we'll show
  4208. 2:44:57you the hearing again from the start in
  4209. 2:44:59about an hour and 15 minutes
  4210. 2:45:02thank you
  4211. 2:45:09[Music]
  4212. 2:45:17here's a quick look at what's on C-SPAN
  4213. 2:45:193 tomorrow defense secretary Rumsfeld
  4214. 2:45:22comes to Capitol Hill to testify about
  4215. 2:45:24his Department's budget and National
  4216. 2:45:26Security issues it's a senate armed
  4217. 2:45:28services Committee hearing live coverage
  4218. 2:45:30at 9 30 a.m Eastern
  4219. 2:45:34you can see another hearing in the
  4220. 2:45:36afternoon this one on retirement
  4221. 2:45:38security and pensions a house Workforce
  4222. 2:45:40subcommittee will hear from assistant
  4223. 2:45:42labor secretary Ann Combs on the subject
  4224. 2:45:44that's live starting at 1 pm Eastern
  4225. 2:45:46again both hearings on our companion
  4226. 2:45:48Network C-SPAN 3.
  4227. 2:45:55[Music]
  4228. 2:45:57the video will resume
  4229. 2:46:03chair recognizes Mr nethercutt
  4230. 2:46:07thank you Mr chairman and
  4231. 2:46:10Mr O'Keefe I want to welcome you sir
  4232. 2:46:12over here yeah I know I've moved sir um
  4233. 2:46:17I appreciate your being here and I
  4234. 2:46:19appreciate the sensitivity with which
  4235. 2:46:21you and the entire NASA team reacted to
  4236. 2:46:25this terrible tragedy uh certainly uh
  4237. 2:46:28was touched by Senator Stevens remarks
  4238. 2:46:30and and agree with them with respect to
  4239. 2:46:31your integrity and your qualifications
  4240. 2:46:33thank you Congress uh thank you uh the
  4241. 2:46:38the crew that we lost touched
  4242. 2:46:43my Eastern Washington District Michael
  4243. 2:46:46Anderson was a proud product of our
  4244. 2:46:48community and and Ron dittamore
  4245. 2:46:50certainly is too and uh so it touched
  4246. 2:46:53our community very deeply but in that
  4247. 2:46:56respect we're respectful of
  4248. 2:46:58all that they have done and and in the
  4249. 2:47:01case of the NASA team will continue to
  4250. 2:47:02do
  4251. 2:47:03this was a science driven crew
  4252. 2:47:07they spent 16 days in space and and
  4253. 2:47:12we're 16 minutes from landing and in the
  4254. 2:47:15process
  4255. 2:47:16uh with the space uh have research
  4256. 2:47:20double module we're doing tremendous
  4257. 2:47:23numbers of experiments as I understand
  4258. 2:47:25it
  4259. 2:47:26and with the loss of of the Columbia the
  4260. 2:47:30question
  4261. 2:47:31comes what data might we have been able
  4262. 2:47:34to
  4263. 2:47:35collect with respect to their 16 days of
  4264. 2:47:38scientific research efforts
  4265. 2:47:40and um maybe that's my question
  4266. 2:47:43basically is what were we able to retain
  4267. 2:47:46and preserve with respect to their
  4268. 2:47:48scientific research Legacy yes sir no
  4269. 2:47:52question it was an extraordinary uh
  4270. 2:47:54mission that was intensively science
  4271. 2:47:57focused you've characterized exactly
  4272. 2:47:59right over 16 days a lot of the data and
  4273. 2:48:02returns from May those experiments were
  4274. 2:48:05relayed back and so the scientific
  4275. 2:48:07Community has the benefit of that
  4276. 2:48:09information but to be sure the physical
  4277. 2:48:13laboratory as well as a physical
  4278. 2:48:15experimentation that was aboard 107 is
  4279. 2:48:19lost for Alternatives no question there
  4280. 2:48:21but let me provide for you for the
  4281. 2:48:24record a rundown of the kind of data and
  4282. 2:48:27information we have gotten back
  4283. 2:48:28categorized by the kind of areas but it
  4284. 2:48:30was a phenomenal Trove of uh of
  4285. 2:48:33information that I think will yet prove
  4286. 2:48:35to be very enlightening information as
  4287. 2:48:38research continues on a range of
  4288. 2:48:41biomedical as well as physical sciences
  4289. 2:48:43research and material research
  4290. 2:48:45activities in the future
  4291. 2:48:47let me ask you if there is any support
  4292. 2:48:50that NASA will offer to the principal
  4293. 2:48:52investigators who lost scientific
  4294. 2:48:55capability as well if you've been able
  4295. 2:48:58to assess that yet or make any judgments
  4296. 2:49:00about the principal investigators and
  4297. 2:49:03and what losses that might have been
  4298. 2:49:04sustained as the Columbia was lost yes
  4299. 2:49:06sir I mean if there are a number of
  4300. 2:49:08folks who had based a lot of the
  4301. 2:49:11experimentation their entire
  4302. 2:49:12dissertations were riding on this so
  4303. 2:49:14years of research activity
  4304. 2:49:17uh has really been set back dramatically
  4305. 2:49:20as a result of that that's
  4306. 2:49:21inconsequential Low by comparison to the
  4307. 2:49:23loss of lives to be sure but it is
  4308. 2:49:25something we need to be uh extremely
  4309. 2:49:28mindful of there was to have been a a
  4310. 2:49:30get-together this past week I think with
  4311. 2:49:32the the biological and physical research
  4312. 2:49:35components of our agency with all the
  4313. 2:49:38principal investigators that had a stake
  4314. 2:49:40if you will in the 107 experiment and
  4315. 2:49:43research regime we are certainly intent
  4316. 2:49:46on on trying to reconvene that session
  4317. 2:49:48to find out what may be remedial uh for
  4318. 2:49:52their efforts as we work through this in
  4319. 2:49:53terms of the kind of information we
  4320. 2:49:54might look to in future flights but we
  4321. 2:49:56will work that I assure you that's
  4322. 2:49:58something as prominent on our minds as
  4323. 2:50:00well is your commitment lessened or
  4324. 2:50:02diminished at all to scientific research
  4325. 2:50:04and the value of station and the the
  4326. 2:50:07efforts that were undertaken by this
  4327. 2:50:09crew not one iota as a matter of fact
  4328. 2:50:11the families of the 107 crew uh most
  4329. 2:50:16stoic courageous people you would ever
  4330. 2:50:18want to meet within two hours of this
  4331. 2:50:20activity we're already saying you know
  4332. 2:50:23you cannot give up on this this set of
  4333. 2:50:25objectives they dedicated their lives to
  4334. 2:50:28this
  4335. 2:50:28that's what they were committed to doing
  4336. 2:50:30you cannot move away from it it was a it
  4337. 2:50:33had been an inspirational group and that
  4338. 2:50:35in and of itself has been sufficient
  4339. 2:50:37cause in my mind to not step back from
  4340. 2:50:39our commitments in this regard one inch
  4341. 2:50:42I appreciate it Congressman thank you
  4342. 2:50:43thank you some of the members expired
  4343. 2:50:45and if I could ask the people operating
  4344. 2:50:46the door if you could have keep that
  4345. 2:50:48door closed as much as possible as some
  4346. 2:50:51beautiful singing going on outside but
  4347. 2:50:53we don't don't need it in the room now I
  4348. 2:50:55have the only astronaut that's serving
  4349. 2:50:58currently in the United States Senate
  4350. 2:50:59Senator Nelson from Florida thank you Mr
  4351. 2:51:02chairman Mr O'Keefe uh prior to you
  4352. 2:51:06arriving at NASA
  4353. 2:51:10the space shuttle budget
  4354. 2:51:12was whacked
  4355. 2:51:14by some 1.4 billion dollars
  4356. 2:51:19uh basically part of that over a nine
  4357. 2:51:23year period this is
  4358. 2:51:26uh and and by the way it's not the
  4359. 2:51:28easiest to find this out because prior
  4360. 2:51:31to your arrival back in the early 90s
  4361. 2:51:34everything was lumped in together into a
  4362. 2:51:38human space flight account
  4363. 2:51:40the space shuttle uh the the kinds of
  4364. 2:51:43new technologies plus the station but
  4365. 2:51:46when you break it out
  4366. 2:51:48what you find is that the Congress
  4367. 2:51:50whacked part of it about 600 million out
  4368. 2:51:55of the space shuttle thank you and uh
  4369. 2:51:59then NASA itself
  4370. 2:52:01whacked another 750.
  4371. 2:52:05uh putting those two together
  4372. 2:52:09uh
  4373. 2:52:11you can see the years and this is prior
  4374. 2:52:14to you arriving in O2 that year
  4375. 2:52:17the Congress had added some 45 million
  4376. 2:52:22and and NASA had whacked
  4377. 2:52:2470 million
  4378. 2:52:26to the Space Shuttle
  4379. 2:52:28so
  4380. 2:52:30this will be an ongoing dialogue that we
  4381. 2:52:33will have but the question is
  4382. 2:52:36what is your opinion prior to your
  4383. 2:52:40arrival as you look back what had
  4384. 2:52:42happened over that
  4385. 2:52:44nine-year period
  4386. 2:52:48sometimes the Congress would take the
  4387. 2:52:50money out or just reduce it sometimes
  4388. 2:52:53NASA would basically reprogram the money
  4389. 2:52:56and take it out of the space shuttle and
  4390. 2:52:59put it elsewhere
  4391. 2:53:02does that compromise safety
  4392. 2:53:05well sir I I I don't know the audit
  4393. 2:53:08Trail uh clearly as well as as you've
  4394. 2:53:11obviously researched this but this this
  4395. 2:53:14uh particular I think matches with what
  4396. 2:53:17you've projected here uh which is the
  4397. 2:53:19funding history and the the convergence
  4398. 2:53:23of two events and again I've got to
  4399. 2:53:24really look at this in much greater
  4400. 2:53:25detail uh to see the individual year
  4401. 2:53:28changes that have occurred and so forth
  4402. 2:53:30but the trends seem to can connote two
  4403. 2:53:33things first one is that at the same
  4404. 2:53:35time that efficiencies were being
  4405. 2:53:37yielded in different ways of going about
  4406. 2:53:39business
  4407. 2:53:41that are more risk management and more
  4408. 2:53:43what I would call Quality Assurance
  4409. 2:53:45related approaches that raises and
  4410. 2:53:48improves the the risk management
  4411. 2:53:50probabilities
  4412. 2:53:52at the same time also yielded some cost
  4413. 2:53:55reductions along the way by not having
  4414. 2:53:57an intensive group of individuals
  4415. 2:53:59involved in the activity and so all the
  4416. 2:54:01indicators over the same span of time
  4417. 2:54:04seem to suggest but again we've got to
  4418. 2:54:06go back and really look at this very
  4419. 2:54:08very carefully would seem to suggest
  4420. 2:54:10that there were improvements in
  4421. 2:54:12incidents but prior to launch incidents
  4422. 2:54:15on orbit all of the trend lines that we
  4423. 2:54:17use to measure the efficiency and
  4424. 2:54:20performance of the space flight
  4425. 2:54:21operations program seemed to be moving
  4426. 2:54:24in that kind of a trend line that said
  4427. 2:54:26we're going to be guided by what the
  4428. 2:54:28game and board looks at as systemic
  4429. 2:54:30causes if this appears to have been a
  4430. 2:54:32contributing factor we will be right
  4431. 2:54:34back here looking at what those fixes
  4432. 2:54:36need to be to work on and we will carry
  4433. 2:54:37on a continuing Dialogue on this I can
  4434. 2:54:40tell you there are people at Nasa and in
  4435. 2:54:42the astronaut office that feel like that
  4436. 2:54:45safety has been compromised over the
  4437. 2:54:48last 10 years as a result of the Space
  4438. 2:54:51Shuttle budget being rated
  4439. 2:54:53and that's something that we've got to
  4440. 2:54:55be concerned about one other item we're
  4441. 2:54:58happy to hear those comments and any
  4442. 2:55:00other views from anybody inside or
  4443. 2:55:02external to the agency to come to ground
  4444. 2:55:03truth and find the answers to what
  4445. 2:55:05happened in this case absolutely senator
  4446. 2:55:08uh might you comment on the fact that if
  4447. 2:55:12that's the time of the senator has
  4448. 2:55:14expired and we're having to stay on very
  4449. 2:55:16very tight time frames chair recognize
  4450. 2:55:18Mr weiner thank you welcome uh I I fear
  4451. 2:55:22in your statement you have articulated a
  4452. 2:55:25I guess a straw man that some of my
  4453. 2:55:28colleagues in their questions have
  4454. 2:55:30knocked down and when you said that we
  4455. 2:55:32ought not turn our backs on exploration
  4456. 2:55:34and that the research that was done on
  4457. 2:55:36the shuttle was valuable in cancer
  4458. 2:55:38treatment crop yield and fire
  4459. 2:55:39suppression and dust storms but it is a
  4460. 2:55:43fact that all of that research could
  4461. 2:55:46have
  4462. 2:55:47should have and would have been done on
  4463. 2:55:50the space station had it been completed
  4464. 2:55:53and in fact the shuttle has more often
  4465. 2:55:55than not
  4466. 2:55:56not been a research vehicle but a
  4467. 2:55:59delivery vehicle supporting other
  4468. 2:56:01platforms for science whether it be
  4469. 2:56:03satellites or telescopes or the space
  4470. 2:56:07station
  4471. 2:56:08one of the many things that made the
  4472. 2:56:10Columbia Mission noteworthy was the fact
  4473. 2:56:12that it was a pure science mission
  4474. 2:56:14uh apparently only 11 of the last 46
  4475. 2:56:18shuttles have been able to say that it
  4476. 2:56:20got to be so frustrating that in the
  4477. 2:56:22106th Congress there was actually
  4478. 2:56:24language put into the appropriation bill
  4479. 2:56:26that this shuttle should contain more
  4480. 2:56:29research
  4481. 2:56:30you know shuttle astronauts I I fear to
  4482. 2:56:33say have become more often than not very
  4483. 2:56:37high skilled
  4484. 2:56:38often brilliant
  4485. 2:56:40in undeniably courageous
  4486. 2:56:43cargo carriers
  4487. 2:56:45and to demonstrate this point I don't
  4488. 2:56:47have a Graphic but you do and I'd ask
  4489. 2:56:49you to put up number 20.
  4490. 2:56:54under something marked safety indicators
  4491. 2:56:57is a chart that said launches more than
  4492. 2:57:00ever cargo capacity up as much as one
  4493. 2:57:02hundred percent
  4494. 2:57:03cargo capacity being an indicator of
  4495. 2:57:06safety leads me to the indiscapable
  4496. 2:57:08conclusion that having more cargo means
  4497. 2:57:12fewer flights means safer human beings
  4498. 2:57:15this should not be how we measure
  4499. 2:57:17whether someone is safe or not because
  4500. 2:57:20frankly as we learned within I guess 48
  4501. 2:57:23hours after this horrible accident an
  4502. 2:57:26unmanned vehicle went up and brought
  4503. 2:57:28cargo to the space station
  4504. 2:57:31and also on chart number 18
  4505. 2:57:34the same chart that has the reduction of
  4506. 2:57:37in-flight anomalies monthly mishap
  4507. 2:57:39frequencies technical scrubs brags about
  4508. 2:57:42the increase in lift capacity to the
  4509. 2:57:44Space Shuttle it seems that we're mixing
  4510. 2:57:47the the need to keep people safe which
  4511. 2:57:50is something that I think you have
  4512. 2:57:51articulated several times here today
  4513. 2:57:53with this ever-growing notion that the
  4514. 2:57:56space shuttle is the only way we should
  4515. 2:57:58develop or the only way the only means
  4516. 2:58:01we should use to carry cargo we want
  4517. 2:58:04science to be done in Space over and
  4518. 2:58:06over again we in Congress have been
  4519. 2:58:08asked the question because our colleague
  4520. 2:58:09put it to us do you want to continue the
  4521. 2:58:11space station funding we all say yes I
  4522. 2:58:13say yes but we have to be careful not to
  4523. 2:58:16confuse what the shuttle has been as a
  4524. 2:58:19science Mission it has been a UPS truck
  4525. 2:58:22for space shuttle supplies and I'm not
  4526. 2:58:25sure that if you believe that increase
  4527. 2:58:27in cargo is a way to make people safer
  4528. 2:58:30than having a manned Cargo Carrier is
  4529. 2:58:33the right way to go at all and if you
  4530. 2:58:34just address that particularly chart
  4531. 2:58:35number 20 if you could sure thank you
  4532. 2:58:38sir Cargo in the term you've used here
  4533. 2:58:41means assembly and science both okay and
  4534. 2:58:45in the last four years to be sure many
  4535. 2:58:48of the Space Shuttle flights and I think
  4536. 2:58:49you point out the history precisely
  4537. 2:58:50right that we have dedicated the use of
  4538. 2:58:53shuttle for the purpose of bringing up
  4539. 2:58:55large sections of the International
  4540. 2:58:57Space Station for on-orbit assembly this
  4541. 2:59:00is an engineering Marvel we're building
  4542. 2:59:01in space now there's no other way to do
  4543. 2:59:05this there's no way to launch the
  4544. 2:59:07completed International Space Station in
  4545. 2:59:08one Fell Swoop or one piece so each of
  4546. 2:59:11it's been assembled on orbit and by no
  4547. 2:59:13means of these UPS truck now the the
  4548. 2:59:15question if you if you'll just
  4549. 2:59:17understand the question is not that it
  4550. 2:59:18is if you can bring food if you can
  4551. 2:59:21bring clothing
  4552. 2:59:23I'm sorry I didn't get I didn't get to
  4553. 2:59:25the answer fast enough I apologize sorry
  4554. 2:59:27I'm the progress vehicle that went up
  4555. 2:59:29the uh the Sunday after the accident did
  4556. 2:59:33in fact contain groceries Logistics
  4557. 2:59:36supplies those kinds of things that's
  4558. 2:59:37not typically what we put a bar aboard
  4559. 2:59:39shuttle there are some of those things
  4560. 2:59:41that are there but mostly those are
  4561. 2:59:42carried by those unmanned autonomous
  4562. 2:59:45cape abilities that are brought in to
  4563. 2:59:47sustain the typical consumable
  4564. 2:59:49requirements others are put a board
  4565. 2:59:52shuttle too like water and a few other
  4566. 2:59:53things but typically what it is is the
  4567. 2:59:55cargo section includes the components
  4568. 2:59:58the modules of the International Space
  4569. 3:00:00Station that couldn't get there any
  4570. 3:00:01other way or the science that as we see
  4571. 3:00:04in this particular case of the 107 as
  4572. 3:00:06well as on every one of the shuttle
  4573. 3:00:08flights the science experimentation
  4574. 3:00:10going up Mass to the International Space
  4575. 3:00:12Station to bring those scientific
  4576. 3:00:14experiments to there this there's no
  4577. 3:00:16other way to do that and there are no
  4578. 3:00:19way to put them aboard autonomous
  4579. 3:00:21unmanned vehicles at this juncture that
  4580. 3:00:24would do anything other than provide
  4581. 3:00:25basic Logistics requirements so I I get
  4582. 3:00:28your point you're exactly right we're
  4583. 3:00:30trying to uh to maximize the yield of
  4584. 3:00:33what can be as we call it up Mass to the
  4585. 3:00:35International Space Station or in any
  4586. 3:00:37other orbit pattern but at the same time
  4587. 3:00:39also minimize the risk to the
  4588. 3:00:41individuals so that really the human
  4589. 3:00:43involvement in that is
  4590. 3:00:47has expired thank you very much now I
  4591. 3:00:50have the senator from the host State for
  4592. 3:00:52the Johnson Space Station state of Texas
  4593. 3:00:53Senator Hutchison thank you well thank
  4594. 3:00:55you
  4595. 3:00:57say uh Mr O'Keefe I I know how
  4596. 3:01:01devastated you are I've never seen a
  4597. 3:01:03sadder face than yours in the last few
  4598. 3:01:05weeks and all the pictures and I think
  4599. 3:01:08that you have handled the immediate
  4600. 3:01:09aftermath very well and I appreciate
  4601. 3:01:12that I also want to say I appreciate Mr
  4602. 3:01:16rohrbacher's mention of the Texas
  4603. 3:01:19residents who never expected anything
  4604. 3:01:23like this but have been so supportive of
  4605. 3:01:26NASA throughout East Texas looking for
  4606. 3:01:29the debris and consider themselves sort
  4607. 3:01:32of deputies in the investigation and I'm
  4608. 3:01:35very proud of of my home state and
  4609. 3:01:38especially the NASA people and the NASA
  4610. 3:01:42family I grew up in the area I have
  4611. 3:01:45known the NASA family since the
  4612. 3:01:47announcement that NASA would come to
  4613. 3:01:50Johnson and have known the close-knit
  4614. 3:01:54nature of that community and I
  4615. 3:01:58appreciate all of them as well
  4616. 3:02:01I want to talk about some of the
  4617. 3:02:03experiments that have been successful
  4618. 3:02:06and have made a difference in our lives
  4619. 3:02:09really from the National Science
  4620. 3:02:12biomedical research institute which is
  4621. 3:02:14not the old past successes of of space
  4622. 3:02:18research but the newer ones they have
  4623. 3:02:21developed portable infrared sensors to
  4624. 3:02:24determine Blood and Tissue chemistry
  4625. 3:02:26non-invasively which could help us in
  4626. 3:02:30intensive care units and ambulances be
  4627. 3:02:32able to test people quickly and
  4628. 3:02:34determine hemorrhaging or other maladies
  4629. 3:02:37developed a biosensor for microbes and
  4630. 3:02:40toxins that has an application in the
  4631. 3:02:42bioterrorism field for early detection
  4632. 3:02:45and treatment could be used by military
  4633. 3:02:47searching caves in Afghanistan or by
  4634. 3:02:49weapons inspectors helped further
  4635. 3:02:52development of a focused ultrasound
  4636. 3:02:55system for Hemorrhage control and for
  4637. 3:02:58destroying unwanted tissues or tumors
  4638. 3:03:00that could one day allow bloodless
  4639. 3:03:03surgery
  4640. 3:03:04right there on the Columbia they dealt
  4641. 3:03:09dealing with combustion they created the
  4642. 3:03:12weakest flame ever seen in a laboratory
  4643. 3:03:14environment about 1 200th that of a
  4644. 3:03:17match which would be significant since
  4645. 3:03:20soot contributes to sixty thousand
  4646. 3:03:23premature deaths each year in the United
  4647. 3:03:25States my question is this we do have a
  4648. 3:03:29future in medical research your own
  4649. 3:03:32board of scientists came back to you and
  4650. 3:03:36said that is a future for manned space
  4651. 3:03:39research the question is if the space
  4652. 3:03:42shuttle is grounded for a year or six
  4653. 3:03:45months what would be the impact on
  4654. 3:03:47Research or do you foresee something
  4655. 3:03:49even further down the road for the use
  4656. 3:03:53of the shuttle and secondly if
  4657. 3:03:57the space station is not serviced by the
  4658. 3:03:59shuttle regularly for a long period of
  4659. 3:04:02time
  4660. 3:04:03what would the the capability be to
  4661. 3:04:07continue the use of those microgravity
  4662. 3:04:09conditions or do any of our
  4663. 3:04:11International Partners have a vehicle
  4664. 3:04:13capable of servicing including assembly
  4665. 3:04:16the station
  4666. 3:04:18thank you Senator uh if I could just on
  4667. 3:04:20the front associate myself with your
  4668. 3:04:22comments about the folks from East Texas
  4669. 3:04:24unbelievable support
  4670. 3:04:26and folks like CG Macklin who's the city
  4671. 3:04:29manager of Lufkin Texas uh Captain Paul
  4672. 3:04:31Davis from the Department of Public
  4673. 3:04:33Safety down there unbelievable people
  4674. 3:04:35who have stepped up in a way that is
  4675. 3:04:37just truly heroic and we are grateful to
  4676. 3:04:40them they've never been associated with
  4677. 3:04:42the NASA family and yet here they are
  4678. 3:04:44contributing in a way that really is
  4679. 3:04:45remarkable we are eternally grateful to
  4680. 3:04:47them for their uh assistance as we've
  4681. 3:04:50moved through this very difficult time
  4682. 3:04:51in working through the challenges there
  4683. 3:04:54the impact on station to be sure is uh
  4684. 3:04:57is is is a real difficult circumstance
  4685. 3:05:00given the fact that the next flight that
  4686. 3:05:04was due in March would have been a crew
  4687. 3:05:06rotation for Expedition six to be
  4688. 3:05:08replaced by Expedition seven uh that to
  4689. 3:05:12the extent that we are able to get a
  4690. 3:05:14answers to the current challenge that
  4691. 3:05:17are underway that the investigative
  4692. 3:05:18board is looking to
  4693. 3:05:19and if we can get back to flight and
  4694. 3:05:21resume say flight operations there
  4695. 3:05:24should be no diminution of that support
  4696. 3:05:26to station
  4697. 3:05:27the extent that that doesn't happen and
  4698. 3:05:28the best scenario is not realized we do
  4699. 3:05:31have the capability on the soyuz flights
  4700. 3:05:33which is the the twice a year rotation
  4701. 3:05:36of the emergency egress capsule uh three
  4702. 3:05:40cosmonauts were due to be sent up
  4703. 3:05:42cosmonauts and astronauts were due to go
  4704. 3:05:43up in April we're looking at what that
  4705. 3:05:46crew configuration is kind of Consulting
  4706. 3:05:48with our International Space Station
  4707. 3:05:49Partners to determine the best way to
  4708. 3:05:52configure the crew to use it potentially
  4709. 3:05:55as a rotation capability for the folks
  4710. 3:05:58that are aboard International Space
  4711. 3:05:59Station now Ken Bauer socks Don Pettit
  4712. 3:06:01and Nikolai bodarin potentially have the
  4713. 3:06:04opportunity to come back aboard that
  4714. 3:06:06particular soyuz return vehicle and send
  4715. 3:06:09a replacement crew up we're looking at
  4716. 3:06:11what those options may call for in terms
  4717. 3:06:13of long-term sustainment of the
  4718. 3:06:16International Space Station for science
  4719. 3:06:17there's no question between now and June
  4720. 3:06:20there is an ample Trove of science
  4721. 3:06:22aboard uh the station right now that Ken
  4722. 3:06:26Bowersox assures me and more important
  4723. 3:06:29Don Pettit who is the science Officer
  4724. 3:06:30says has got him occupied every single
  4725. 3:06:33day and won't be a limiting factor
  4726. 3:06:36between now and the time the summer
  4727. 3:06:38rolls around beyond that there's no
  4728. 3:06:40question it would end up likely being a
  4729. 3:06:42sustaining capability because in pursuit
  4730. 3:06:44of the earlier commentary we just had a
  4731. 3:06:47conversation there is a the up mass or
  4732. 3:06:50the capability to lift the science
  4733. 3:06:52experimentation in the mid deck lockers
  4734. 3:06:54and so forth that are aboard the shuttle
  4735. 3:06:56typically are what bring the scientific
  4736. 3:06:58experimentation return or rotation for
  4737. 3:07:01the International Space Station to that
  4738. 3:07:03laboratory condition and that would not
  4739. 3:07:06be feasible to do you can't get all that
  4740. 3:07:08aboard a resupply vehicle like progress
  4741. 3:07:12is which is one man and for Logistics
  4742. 3:07:14and basic consumables for everything you
  4743. 3:07:17take out of it it's that much less
  4744. 3:07:18sustaining capability we have for the
  4745. 3:07:20human beings aboard and the humans are
  4746. 3:07:22going to be the primary focus of our
  4747. 3:07:24intentions so therefore we would see a
  4748. 3:07:26limitation and a diminution of the
  4749. 3:07:28Science Focus that would be aboard but
  4750. 3:07:30for right now it is positively stationed
  4751. 3:07:32today as it was yesterday and will
  4752. 3:07:34continue through the balance of this
  4753. 3:07:36time is the most capable laboratory
  4754. 3:07:39condition we have that we are maximizing
  4755. 3:07:41the science and that sustains for
  4756. 3:07:43several months to come we'll have to
  4757. 3:07:45make adjustments beyond that if this
  4758. 3:07:47goes beyond that period manager's time
  4759. 3:07:48is expired thank you Senator appreciate
  4760. 3:07:50it very much
  4761. 3:07:52extra Etheridge
  4762. 3:07:54so keep thank you for being here and let
  4763. 3:07:57me also associate myself with expressing
  4764. 3:07:59condolences to the families and others
  4765. 3:08:01and
  4766. 3:08:02and also with the concerns that many of
  4767. 3:08:04my colleagues have expressed today to
  4768. 3:08:06make sure the study is independent
  4769. 3:08:10I think that needs to be done for the
  4770. 3:08:11accomplishments of this Congress and for
  4771. 3:08:13the American people for the future of
  4772. 3:08:15the program which I strongly support and
  4773. 3:08:17think it's important to continue
  4774. 3:08:19uh
  4775. 3:08:20and let me say the people of North
  4776. 3:08:23Carolina share with you greatly because
  4777. 3:08:25we will celebrate the 100th anniversary
  4778. 3:08:27of flight this year in two of the four
  4779. 3:08:29celebrations in this country so we have
  4780. 3:08:31a deep commitment to space and to fly
  4781. 3:08:36um I was in school on Monday right after
  4782. 3:08:38the Saturday uh terrible disaster
  4783. 3:08:42children were concerned obviously as
  4784. 3:08:44they always are you mentioned earlier
  4785. 3:08:46someone did and I think it's appropriate
  4786. 3:08:48to cover here because this is a great
  4787. 3:08:50teaching tool not disasters but space
  4788. 3:08:52flight
  4789. 3:08:54in the 1960s President Kennedy said
  4790. 3:08:57we're going to put a man on the moon
  4791. 3:08:59before the end of this decade we didn't
  4792. 3:09:01know we could do it we didn't know how
  4793. 3:09:03to do it but it spawned the growth of
  4794. 3:09:05scientists and Engineers that you talked
  4795. 3:09:08about were getting ready to age out
  4796. 3:09:09don't you think it's about time we had
  4797. 3:09:11another grand plan and decide we're
  4798. 3:09:14going to put a man on Mars
  4799. 3:09:16or some great plant that may be above
  4800. 3:09:18your pay grade
  4801. 3:09:19but someone needs to say it so we get
  4802. 3:09:22another generation of excited young
  4803. 3:09:25people to decide they want to get
  4804. 3:09:27involved I know the scientists we have
  4805. 3:09:30in NASA which is a very small Elite
  4806. 3:09:32capable group are there because they
  4807. 3:09:34were excited but we need a bigger core
  4808. 3:09:37very quickly because I have one more
  4809. 3:09:39question I want to get to you
  4810. 3:09:42beyond that and I hope you'll speak to
  4811. 3:09:45that
  4812. 3:09:46on March of this year or last year the
  4813. 3:09:49independent Aerospace advisory safety
  4814. 3:09:52panel reported to you that simply stated
  4815. 3:09:55the panel believed that
  4816. 3:09:56the repeated postponement of safety
  4817. 3:09:59upgrades the delay in uh restoring agent
  4818. 3:10:02infrastructure and the failure to look
  4819. 3:10:03far enough ahead to anticipate and
  4820. 3:10:06correct shortfalls and critical skills
  4821. 3:10:08and logistical availability will
  4822. 3:10:10inevitably
  4823. 3:10:11increase the risk of operating in the
  4824. 3:10:13space shuttle
  4825. 3:10:15however since then I understand that
  4826. 3:10:18NASA has canceled planned upgrade
  4827. 3:10:20projects shifted funding for upgraded
  4828. 3:10:22further out in time
  4829. 3:10:24and it indicated that it needed to do
  4830. 3:10:26more studies
  4831. 3:10:28of what the upgrade should be and how
  4832. 3:10:30they would be undertaken can you tell us
  4833. 3:10:33if that's true and if so why and how
  4834. 3:10:36that will help improve safety yes sir to
  4835. 3:10:39your first question on big goals you bet
  4836. 3:10:42the approach that the the president I
  4837. 3:10:45think has advanced as part of
  4838. 3:10:47our plan that is is part of the
  4839. 3:10:50Strategic plan and all the objectives
  4840. 3:10:51they're in is to develop those enabling
  4841. 3:10:54technologies that would then permit the
  4842. 3:10:57establishment of those big goals to be
  4843. 3:10:59attainable
  4844. 3:11:01in the two major limitations that I
  4845. 3:11:03think we have got to beat down and be
  4846. 3:11:05very very thorough in our efforts to
  4847. 3:11:08explore the technology opportunities to
  4848. 3:11:10conquer is the ability to get anywhere
  4849. 3:11:13in a period of time and speed that would
  4850. 3:11:15inform the research agenda
  4851. 3:11:18and also assure that humans when they go
  4852. 3:11:20can survive the experience for the full
  4853. 3:11:23duration of that flight as it stands
  4854. 3:11:25right now based on our current
  4855. 3:11:26technology just to get to the edges of
  4856. 3:11:29this solar system would take us 15 years
  4857. 3:11:31that's an unacceptable period of time it
  4858. 3:11:35would take and assuming that any of the
  4859. 3:11:37scientists the principal investigators
  4860. 3:11:39the research Focus are still interested
  4861. 3:11:41by the time someone would arrive there
  4862. 3:11:43is our is on one of our biggest problems
  4863. 3:11:46because things change an awful lot in
  4864. 3:11:48the span of a decade and a half so our
  4865. 3:11:51first objective which you see dominantly
  4866. 3:11:53in last year's budget in this year's
  4867. 3:11:55budget is how to beat and how to conquer
  4868. 3:11:56the in-space propulsion power generation
  4869. 3:11:59requirements we had the second dimension
  4870. 3:12:01of that is to look very carefully at
  4871. 3:12:04how we can assure that humans survive
  4872. 3:12:07the experience and again the degradation
  4873. 3:12:09we see of this of the five Expedition
  4874. 3:12:12Crews who have been aboard International
  4875. 3:12:14Space Station for sustained periods of
  4876. 3:12:16four to six months or longer
  4877. 3:12:19is typically a physiological challenge
  4878. 3:12:21that we've got to figure out how to
  4879. 3:12:23conquer that because that's the amount
  4880. 3:12:25of time it would take to round trip to
  4881. 3:12:27anywhere that seems to be of curiosity
  4882. 3:12:29that would be informed by research and
  4883. 3:12:32scientific objectives and we've got to
  4884. 3:12:33be sure that the folks can survive that
  4885. 3:12:35experience so that and the radiation
  4886. 3:12:37affects all those things an intensive
  4887. 3:12:39amount of effort that you see in the the
  4888. 3:12:41budget proposal before you is
  4889. 3:12:43concentrated on trying to conquer those
  4890. 3:12:45kinds of limitations and understand what
  4891. 3:12:47it would take to assure a safe
  4892. 3:12:49round-trip activity in that regard as it
  4893. 3:12:52pertains to the second point we raised
  4894. 3:12:54of of upgrades what we have proposed in
  4895. 3:12:57the the budget amendment that came
  4896. 3:12:59forward last November 13th of 2002 was a
  4897. 3:13:03direct consequence of
  4898. 3:13:06recommendations from both the general
  4899. 3:13:08Accounting Office the safety advisory
  4900. 3:13:10panel all the different external groups
  4901. 3:13:13that we have had reviewing what we do
  4902. 3:13:15have suggested that the longer term
  4903. 3:13:18shuttle requirements to the extent we
  4904. 3:13:20want to sustain that capability required
  4905. 3:13:22that we look at modernizing and
  4906. 3:13:25upgrading those capabilities each and
  4907. 3:13:27every time as we do in the Orbiter major
  4908. 3:13:29modification program what's in the the
  4909. 3:13:31proposal for fiscal Euro 3 that the
  4910. 3:13:33Congress is still deliberating on now
  4911. 3:13:35and for the o4 program that the
  4912. 3:13:37president just submitted a week ago is a
  4913. 3:13:40very specific plan that would would
  4914. 3:13:42provide for those increases necessary to
  4915. 3:13:46sustain this capability through the next
  4916. 3:13:48decade primarily for lift capacity of of
  4917. 3:13:52those requirements as well as crew
  4918. 3:13:54transfer capabilities to and from
  4919. 3:13:56International Space Station and
  4920. 3:13:58elsewhere this is maneuverable as we can
  4921. 3:13:59make it thank you sir appreciate it very
  4922. 3:14:01much Mr Smith
  4923. 3:14:04thank you Mr chairman I don't have any
  4924. 3:14:05questions Beyond those that have already
  4925. 3:14:07been asked but I do have a statement I'd
  4926. 3:14:09like to make and then I'd welcome Mr
  4927. 3:14:11O'Keefe's comments when I finish Mr
  4928. 3:14:13chairman I have long supported our
  4929. 3:14:15efforts to learn more about the universe
  4930. 3:14:17around us in fact I've always thought
  4931. 3:14:19that a great rallying crime would be one
  4932. 3:14:22percent for space that is we should
  4933. 3:14:24commit one percent of our national
  4934. 3:14:26budget we're about double what we now
  4935. 3:14:28spend on scientific discoveries beyond
  4936. 3:14:31the bounds of Earth
  4937. 3:14:32the Columbia disaster though has made me
  4938. 3:14:35question not our financial commitment
  4939. 3:14:37but the nature of our space initiatives
  4940. 3:14:40perhaps we should re-evaluate some of
  4941. 3:14:42our missions
  4942. 3:14:44launching astronauts into an inherently
  4943. 3:14:46dangerous environment is always risky
  4944. 3:14:49such efforts should be made only when
  4945. 3:14:51the results justify the sacrifices
  4946. 3:14:54that may mean NASA undertakes fewer
  4947. 3:14:57manned missions and more unmanned ones
  4948. 3:15:00from what I read and hear astronauts on
  4949. 3:15:02the space station spend most of their
  4950. 3:15:03time on maintenance and conducting
  4951. 3:15:05experiments that could be performed by
  4952. 3:15:07mechanical means of course human
  4953. 3:15:10judgment sometimes is indispensable so
  4954. 3:15:13there always will be a need for manned
  4955. 3:15:15missions but robotics should be employed
  4956. 3:15:17more often they can achieve our
  4957. 3:15:20scientific goals more cheaply and with
  4958. 3:15:22less risk to astronauts lives in other
  4959. 3:15:25words can we justify Decades of
  4960. 3:15:28repetitious yet demonstrably lethal
  4961. 3:15:30round-trip shuttle flights to a space
  4962. 3:15:32station that has not met expectations
  4963. 3:15:36it's tempting to aim farther at an
  4964. 3:15:39inhabited outpost on Mars for example
  4965. 3:15:42however that endeavor could be 100 times
  4966. 3:15:44or maybe one thousand times more
  4967. 3:15:46dangerous than a shuttle flight and
  4968. 3:15:48through the video eyes of a Martian
  4969. 3:15:50Rover we've seen what the planet already
  4970. 3:15:52looks like up close
  4971. 3:15:54nor are our prospects great for
  4972. 3:15:56exploring our Cosmic neighborhood
  4973. 3:15:58considering the distances involved our
  4974. 3:16:01fastest spacecraft can travel 100 times
  4975. 3:16:03faster than a bullet yet even at that
  4976. 3:16:06incredible speed such Vehicles would
  4977. 3:16:08take one hundred thousand years to reach
  4978. 3:16:10the nearest Stars
  4979. 3:16:13there is a way to reach across the
  4980. 3:16:15expansive space Seize The public's
  4981. 3:16:17imagination and learn more about
  4982. 3:16:19ourselves and the cosmos and that is to
  4983. 3:16:22search for signs of life elsewhere in
  4984. 3:16:25the universe
  4985. 3:16:26a new generation of telescopes launched
  4986. 3:16:28into space would be able to identify
  4987. 3:16:30life on worlds orbiting nearby Stars
  4988. 3:16:33other types of telescopes could detect
  4989. 3:16:36radio or light signals from distant
  4990. 3:16:38civilizations
  4991. 3:16:39discovering the probable existence of
  4992. 3:16:41Life out there would cause more
  4993. 3:16:44excitement than any news event in the
  4994. 3:16:46history of humankind it would certainly
  4995. 3:16:48be a show stopper and the possibility of
  4996. 3:16:51extraterrestrial life a show starter for
  4997. 3:16:54our next major Space Program
  4998. 3:16:57searching for something more than
  4999. 3:16:58microbes for planets like the Earth and
  5000. 3:17:01for other sentient life forms could lift
  5001. 3:17:03our faces again to the heavens with hope
  5002. 3:17:06and expectation
  5003. 3:17:08shuttle flights using new space planes
  5004. 3:17:10would service these telescopes no doubt
  5005. 3:17:12such operations will often require the
  5006. 3:17:14good judgment and capable skills of
  5007. 3:17:16astronauts
  5008. 3:17:17and astronauts who have gone before such
  5009. 3:17:20as those aboard the Columbia will have
  5010. 3:17:22laid a foundation from which we can push
  5011. 3:17:24off seeking to discern the secrets of
  5012. 3:17:27the universe Mr O'Keefe I'd like you to
  5013. 3:17:30respond to the idea if not my specifics
  5014. 3:17:32then the general idea of reframing the
  5015. 3:17:36mission that we have in mind and if you
  5016. 3:17:39have other suggestions I'd be happy to
  5017. 3:17:40hear them I mentioned one for seizing
  5018. 3:17:42that Public's imagination and yet
  5019. 3:17:44learning more about the universe and I'd
  5020. 3:17:47be happy for you to respond to those
  5021. 3:17:48suggestions yes sir well no I thank you
  5022. 3:17:51for the for the very thoughtful
  5023. 3:17:52commentary and also for I think of the
  5024. 3:17:55same kind of issues we're wrestling with
  5025. 3:17:57in terms of what our appropriate
  5026. 3:17:58strategy should be
  5027. 3:18:00in in so many ways again it's got to be
  5028. 3:18:02it's not an either or proposition it's a
  5029. 3:18:04capability in which you build on the
  5030. 3:18:06robotic
  5031. 3:18:08unmanned non-human intervention of
  5032. 3:18:11capabilities that you can deploy and
  5033. 3:18:13then utilize human requirements when
  5034. 3:18:15necessary
  5035. 3:18:17again the best example I've I've come
  5036. 3:18:19across in my short one year tenure at
  5037. 3:18:22Nasa is is the Hubble Space Telescope it
  5038. 3:18:24is just a remarkable instrument today
  5039. 3:18:26it's something that is rewriting the
  5040. 3:18:28astronomy books folks are just marveling
  5041. 3:18:30at the capacity and the imagery that's
  5042. 3:18:33coming back from those flights from the
  5043. 3:18:35uh from the information from the Hubble
  5044. 3:18:37telescope is not only the new imagery
  5045. 3:18:40that we're getting but it's also
  5046. 3:18:41informing the archival data that was
  5047. 3:18:43collected in the last few years that
  5048. 3:18:46suddenly now makes more sense because of
  5049. 3:18:48the the information we're getting today
  5050. 3:18:49that now puts that in a different
  5051. 3:18:51context and makes it more spectacular
  5052. 3:18:53the reality is that fantastic instrument
  5053. 3:18:57would never have worked have we not had
  5054. 3:19:00the capacity to launch a space shuttle
  5055. 3:19:02and send folks to the Hubble Space
  5056. 3:19:06Telescope to make the adjustments to
  5057. 3:19:08correct the problems which was again
  5058. 3:19:10roundly considered to be space trash 10
  5059. 3:19:13years ago this same instrument that was
  5060. 3:19:15roundly you know dismissed is a mistake
  5061. 3:19:18these things turned into a marvelous
  5062. 3:19:19piece I just think we need more
  5063. 3:19:20instruments just like that but a bigger
  5064. 3:19:22program and a more expansion program I
  5065. 3:19:24know my time is out maybe we can discuss
  5066. 3:19:25this sure but I I've one of Haitian ad
  5067. 3:19:28as well that what you see before you in
  5068. 3:19:30the current configuration of
  5069. 3:19:31International Space Station is the same
  5070. 3:19:33kind of example this is a work in
  5071. 3:19:35progress we are six flights away
  5072. 3:19:38from still achieving what is a core
  5073. 3:19:41configuration it had been planned to be
  5074. 3:19:43resumed by this time next year is where
  5075. 3:19:46we'd be in that core configuration to
  5076. 3:19:48build the scientific Laboratories around
  5077. 3:19:50it but at present we're still looking at
  5078. 3:19:52an amazing laboratory condition that is
  5079. 3:19:55in contrast to to your characterization
  5080. 3:19:57Sir with all due respect they are
  5081. 3:19:59spending a lot more time on the science
  5082. 3:20:01on these ex and matter of fact the last
  5083. 3:20:03two Expeditions Peggy Whitson just
  5084. 3:20:05returned as the first science officer
  5085. 3:20:07aboard as we've transitioned from this
  5086. 3:20:09engineering phase to one that's more
  5087. 3:20:11intensively focused on the science it
  5088. 3:20:14does take a lot you know at least two
  5089. 3:20:15folks to maintain it no question about
  5090. 3:20:16it but it is as we are able to build the
  5091. 3:20:19crew capacity and focus on the
  5092. 3:20:21scientific objectives once we've reached
  5093. 3:20:23a configuration that would permit that
  5094. 3:20:26full use of a laboratory it's going to
  5095. 3:20:28be I think the same result that we saw
  5096. 3:20:32out of Hubble in the long term which is
  5097. 3:20:34going to yield the kinds of
  5098. 3:20:35breakthroughs that we never dared
  5099. 3:20:37imagine
  5100. 3:20:38as humans we are impatient we want to
  5101. 3:20:41see it now and yet at the same time I
  5102. 3:20:43think the persistence that we're trying
  5103. 3:20:45to exert is to say in the perseverance
  5104. 3:20:47is to make sure that we have that
  5105. 3:20:49capability so that those kinds of
  5106. 3:20:51Revelations like what we see today
  5107. 3:20:53coming from Hebel and our
  5108. 3:20:55stick-to-itiveness over this past decade
  5109. 3:20:56yields the return we'd hope for and it
  5110. 3:20:59is today and it will tomorrow if we keep
  5111. 3:21:01this up thank you very much Mr O'Keefe
  5112. 3:21:03thank you sir I appreciate it you're a
  5113. 3:21:04freak of witness before our panel the
  5114. 3:21:06house members are particularly skilled
  5115. 3:21:09at time management because we operate
  5116. 3:21:10under different rules and so they've
  5117. 3:21:13developed the knack for asking using all
  5118. 3:21:16their time to ask the question and then
  5119. 3:21:18obviously we'll give you the opportunity
  5120. 3:21:20to respond because no question should go
  5121. 3:21:23unresponded to but we're going to stick
  5122. 3:21:25as much as possible to the time
  5123. 3:21:27limitations in the interest of all
  5124. 3:21:29concerns chair now recognizes another
  5125. 3:21:31skilled practitioner of the art of
  5126. 3:21:33questioning Miss Jackson Lee
  5127. 3:21:39chairman what an introduction let me
  5128. 3:21:44chairman and the
  5129. 3:21:47chairman of the senate committee
  5130. 3:21:49for this opportunity and to Mr O'Keefe
  5131. 3:21:53you have shown the proudness and
  5132. 3:21:55wisdom that we have seen over the last
  5133. 3:21:58two weeks compounded of course or
  5134. 3:22:00matched with your compassion
  5135. 3:22:03uh and love for the NASA family my
  5136. 3:22:05sympathy to the extended family and
  5137. 3:22:08pacifically to the families of the
  5138. 3:22:11astronaut Columbia seven a local
  5139. 3:22:14newspaper called them astronauts the
  5140. 3:22:17heroes next door
  5141. 3:22:19and I do want to announce to you and
  5142. 3:22:21we're very pleased
  5143. 3:22:22that now almost 80 members of Congress
  5144. 3:22:25in H.R five
  5145. 3:22:2725 have joined us to give them the
  5146. 3:22:31Congressional gold medal
  5147. 3:22:33which is the higher civilian honor and
  5148. 3:22:35we look forward to NASA supporting us we
  5149. 3:22:37believe that we can move this
  5150. 3:22:39legislation quickly we're going to call
  5151. 3:22:41on our Senate colleagues to join us in
  5152. 3:22:42that and we're very grateful to
  5153. 3:22:44Republicans and Democrats who've signed
  5154. 3:22:46on to this legislation very quickly
  5155. 3:22:49I think the important message that I'd
  5156. 3:22:50like to convey in my brief time is that
  5157. 3:22:54the shuttle will fly again
  5158. 3:22:56and that the challenge should be for
  5159. 3:22:58lack of a better term that it flies
  5160. 3:23:00sooner
  5161. 3:23:02rather than later sooner than two and a
  5162. 3:23:04half years sooner than three years
  5163. 3:23:06you've heard this before so let me focus
  5164. 3:23:08on it again I think it is extremely
  5165. 3:23:10important that we have
  5166. 3:23:11the Admirals committee expanded and I
  5167. 3:23:14think you need to consider the likes of
  5168. 3:23:16a Nobel Laureate an academic
  5169. 3:23:19some industry Engineers should be
  5170. 3:23:21considered some Advocates of Aviation
  5171. 3:23:24and I believe after 9 11 depending on
  5172. 3:23:27their desires family members or
  5173. 3:23:29Representatives should be considered to
  5174. 3:23:31be part of this committee because our
  5175. 3:23:34job is to instill confidence in the
  5176. 3:23:36employees in the families in the
  5177. 3:23:39astronauts not necessarily in that order
  5178. 3:23:40in the American people in this Congress
  5179. 3:23:42and I'm reminded of the Rogers
  5180. 3:23:44commission that had a subsection the
  5181. 3:23:47silent
  5182. 3:23:48safety program and I assume if I was to
  5183. 3:23:50read that it would again comment on the
  5184. 3:23:52issue of safety let me bring these
  5185. 3:23:54points to you and tell you what I'd like
  5186. 3:23:56to hear whether it be in writing or
  5187. 3:23:58you'll be able to say it now I want
  5188. 3:24:01actual dots a road map to lead me from
  5189. 3:24:03or to the conclusion whether it be a
  5190. 3:24:07conclusion that is not popular that
  5191. 3:24:09budgeting did not interfere with the
  5192. 3:24:11safety of this program I want an actual
  5193. 3:24:13we don't want to be presumptive we don't
  5194. 3:24:14want to speculate and we don't want to
  5195. 3:24:16be afraid of saying mistakes
  5196. 3:24:18I want to be able to understand about
  5197. 3:24:20the Frozen foam that fell
  5198. 3:24:23under the underbelly and then hit the
  5199. 3:24:26left leaning wing
  5200. 3:24:27and how we can speculate that that
  5201. 3:24:29didn't count when we had a report in
  5202. 3:24:311994 from Stanford and Carnegie that
  5203. 3:24:33suggested 15 of the tiles could count
  5204. 3:24:36for 85 percent of the damage
  5205. 3:24:38and I understand an engineer in 1997
  5206. 3:24:40most recently said that he thought
  5207. 3:24:43debris falling might have an impact and
  5208. 3:24:45as we all know
  5209. 3:24:47this goes on its belly and therefore
  5210. 3:24:50it's possible for debris to have hit
  5211. 3:24:52while it was in route or while it was in
  5212. 3:24:54space
  5213. 3:24:55so I'd like the direct lines to that
  5214. 3:24:57I'd like to also say that an Orbiter
  5215. 3:25:01shuttle is excellent but I'm very
  5216. 3:25:03interested in payload I think it is a
  5217. 3:25:05valuable part of what we do and I would
  5218. 3:25:07not want to just have a vehicle that
  5219. 3:25:09transported human beings because I want
  5220. 3:25:11research to be able to be done because
  5221. 3:25:13we're saving lives and if you can
  5222. 3:25:14comment on that idea because I
  5223. 3:25:17understand that we are pushing forward
  5224. 3:25:19the research on the Orbiter I am
  5225. 3:25:21certainly excited about that but I want
  5226. 3:25:22to make sure we can carry a good payload
  5227. 3:25:24so that that research that vital
  5228. 3:25:25research can be done
  5229. 3:25:28if you can comment on the fact of the
  5230. 3:25:30ice sickle that fell I call it that and
  5231. 3:25:34why we could suggest or suggest that
  5232. 3:25:36that was not a problem
  5233. 3:25:39um and that you will instruct or however
  5234. 3:25:41the instructions are to this commission
  5235. 3:25:43this committee head by Avril Gaiman that
  5236. 3:25:46he will leave no stone unturned and that
  5237. 3:25:47we'll be able to track or follow his
  5238. 3:25:49tracks budget
  5239. 3:25:52cuts that did occur
  5240. 3:25:54did not have an impact an aging vehicle
  5241. 3:25:57did or did not have an impact 30 some
  5242. 3:25:59years old gentle lady's time has expired
  5243. 3:26:02proving the point and I think
  5244. 3:26:04distinguished chairman I had come to an
  5245. 3:26:06end of my sentence thank you very much
  5246. 3:26:08the um Mr administrator good comment
  5247. 3:26:11briefly I appreciate by all means thank
  5248. 3:26:13you very much Mr chairman the chairman
  5249. 3:26:16thank you um
  5250. 3:26:18very probing questions no question all
  5251. 3:26:21of which I think we should find the
  5252. 3:26:22answers to we must find the answers to
  5253. 3:26:25to understand exactly what happened uh
  5254. 3:26:27to the Columbia and the investigative
  5255. 3:26:30board when they come to conclusion on
  5256. 3:26:32each of those points we positively be
  5257. 3:26:34guided by it let me offer the following
  5258. 3:26:35observations
  5259. 3:26:36everything we've seen
  5260. 3:26:38on the the budget and the resource
  5261. 3:26:41profile for shuttle would suggest that
  5262. 3:26:44concurrent with improvements in
  5263. 3:26:46efficiencies that were also improvements
  5264. 3:26:49in performance and to the extent that
  5265. 3:26:52doesn't bear out to the extent there are
  5266. 3:26:54systemic problems that the investigative
  5267. 3:26:56board concludes led to this tragedy
  5268. 3:26:59that's the kind of things we'll have to
  5269. 3:27:00fix too and their Charter is Broad
  5270. 3:27:02enough to cover that range of issues
  5271. 3:27:04we're not just looking for a technical
  5272. 3:27:06finding of what happened on this one
  5273. 3:27:08flight anything else they want to
  5274. 3:27:10observe they are free to do so and will
  5275. 3:27:12be guided by their view the operational
  5276. 3:27:14problems
  5277. 3:27:15um as again I really want to avoid any
  5278. 3:27:18favorite theory of what it is that could
  5279. 3:27:21have contributed to this we have closed
  5280. 3:27:22off no branch in this fault tree
  5281. 3:27:26analysis if you will we want to make
  5282. 3:27:28sure that everything is analyzed every
  5283. 3:27:30possible thing it could have contributed
  5284. 3:27:32to this to include the foam pulling off
  5285. 3:27:34the external tank whatever all of those
  5286. 3:27:37are are theories that again are current
  5287. 3:27:40there there are certainly plausible and
  5288. 3:27:43we're going going to be guided by the
  5289. 3:27:44investigative board's conclusions of
  5290. 3:27:46what their ultimate contribution was in
  5291. 3:27:49these kind of cases so I really want to
  5292. 3:27:51be sure we're not shutting off any of
  5293. 3:27:53those Avenues but at the same time not
  5294. 3:27:55pursuing one we think is more likely or
  5295. 3:27:58favorable or not in in my limited
  5296. 3:28:01experience with dealing with with the
  5297. 3:28:04crisis circumstances or management of
  5298. 3:28:06situations where you're responding to
  5299. 3:28:08incidents
  5300. 3:28:10typically one of the variables that
  5301. 3:28:11occurs not always but many many times
  5302. 3:28:13the initial evidence proves to be not
  5303. 3:28:16nearly as Illuminating as it was when it
  5304. 3:28:19first came out and so rather than
  5305. 3:28:21tracing or chasing what turns out to be
  5306. 3:28:23a blind Ally and then therefore for
  5307. 3:28:26closing and letting the trail go cold on
  5308. 3:28:29all kinds of other options we've tried
  5309. 3:28:31to maintain an even Keel approach of
  5310. 3:28:34being sure that we not go out and favor
  5311. 3:28:36one favored approach versus another and
  5312. 3:28:39to let all the evidence let the facts
  5313. 3:28:41speak for what ultimately occurred in
  5314. 3:28:43this case so we're avoiding that and I
  5315. 3:28:45too am looking forward to the assessment
  5316. 3:28:47of the investigative board's conclusions
  5317. 3:28:49about how that particular item whether
  5318. 3:28:52it was the contributor or not and that's
  5319. 3:28:55what I'll be guided by as we move along
  5320. 3:28:56lastly your observation that you asked
  5321. 3:28:58about the science content absolutely we
  5322. 3:29:02have to really maximize that that's the
  5323. 3:29:04the risk that we deal with each day
  5324. 3:29:06those seven heroic folks who went aboard
  5325. 3:29:09Columbia were making a contribution to
  5326. 3:29:12the ultimately the science and research
  5327. 3:29:14objectives we have to have a equally uh
  5328. 3:29:19intensive and disciplined approach about
  5329. 3:29:21what we would ask them to risk their
  5330. 3:29:23lives for and be equally serious about
  5331. 3:29:25it
  5332. 3:29:26for every one of those cases in which we
  5333. 3:29:28ask folks to venture off to do these
  5334. 3:29:29things and so we've got to be as
  5335. 3:29:31disciplined as they are in their
  5336. 3:29:33training of assuring that the science
  5337. 3:29:35and the research yield we think could
  5338. 3:29:37come from this meets that same test and
  5339. 3:29:40standard and that's what we're about
  5340. 3:29:41that's what I think we're attempting to
  5341. 3:29:43do in International Space Station we're
  5342. 3:29:45trying to build that capacity to yield
  5343. 3:29:47those kinds of breakthroughs that might
  5344. 3:29:49not would never be possible were it not
  5345. 3:29:51for that facility that can't be
  5346. 3:29:53duplicated here on Earth so we continue
  5347. 3:29:55in that Pursuit we are completely in in
  5348. 3:29:57agreement on that really imperative to
  5349. 3:30:00be that serious about it and I thank you
  5350. 3:30:02for your observations thank you very
  5351. 3:30:04much Mr administrator Mr Feeney
  5352. 3:30:08thank you Mr chairman and for uh
  5353. 3:30:10chairman McCain in the senate for their
  5354. 3:30:12Hospitality today Mr O'Keefe it's uh
  5355. 3:30:16it's great to talk to you I know it's
  5356. 3:30:17been a very difficult weeks for you and
  5357. 3:30:19your staff and I would wonder if you
  5358. 3:30:22could comment on a couple thoughts that
  5359. 3:30:24I had number one within about 15 minutes
  5360. 3:30:27of the Columbia
  5361. 3:30:29's failure to land on time at Kennedy
  5362. 3:30:32Space Center there was a contingency
  5363. 3:30:34plan put into place and I'd like to know
  5364. 3:30:36what if any steps you took upon assuming
  5365. 3:30:38the
  5366. 3:30:39control of the administration at Nasa
  5367. 3:30:43with respect to reviewing familiarizing
  5368. 3:30:46yourself with the contingency plan and
  5369. 3:30:48what you found
  5370. 3:30:49and secondly I was struck by the portion
  5371. 3:30:52of your testimony when you
  5372. 3:30:55spoke I think he used the phrase the
  5373. 3:30:57ethos of safety at Nasa and I think you
  5374. 3:30:59included the contractors work for NASA
  5375. 3:31:01as well not long ago you and I sat as we
  5376. 3:31:04hoped for a liftoff we didn't get one
  5377. 3:31:06that day but in the audience was a young
  5378. 3:31:09man was introduced by the name of David
  5379. 3:31:10Strait I wasn't familiar with his name I
  5380. 3:31:14thought by the reception he got from the
  5381. 3:31:16people there that day he must be a rock
  5382. 3:31:18star or a TV star I don't watch much TV
  5383. 3:31:21or listen to much music either
  5384. 3:31:22but I wonder if you could comment on the
  5385. 3:31:25fact that the people involved in this
  5386. 3:31:28program are passionate about it
  5387. 3:31:31what's your
  5388. 3:31:33view of their professionalism is and
  5389. 3:31:36what we can do as we go through this
  5390. 3:31:38very difficult process of the
  5391. 3:31:39investigation the fix of the problem and
  5392. 3:31:42hopefully hopefully creating a new
  5393. 3:31:43vision of space
  5394. 3:31:45to enhance that of spirit Decor during
  5395. 3:31:47some tough times
  5396. 3:31:49thank you Congressman um
  5397. 3:31:52the issue of the contingency plan no
  5398. 3:31:54question this was something that
  5399. 3:31:56occupied my uh interest from the first
  5400. 3:31:59hour that I was privileged to be in the
  5401. 3:32:02capacity as administrator at NASA
  5402. 3:32:04on the first day I walked into the
  5403. 3:32:06office I asked folks to please take off
  5404. 3:32:08the shelf whatever it is whatever that
  5405. 3:32:10plan is
  5406. 3:32:11of how we would respond to a disaster
  5407. 3:32:14like Challenger
  5408. 3:32:16and I asked that that meeting occur
  5409. 3:32:18within an hour after I requested it so
  5410. 3:32:20that nobody wouldn't have to feel like
  5411. 3:32:22they have to run off and make something
  5412. 3:32:23up that they just pull off the shelf
  5413. 3:32:24what was there
  5414. 3:32:25and we sat down and reviewed that plan
  5415. 3:32:27and it clearly is a of the origin
  5416. 3:32:32from the Challenger circumstance no
  5417. 3:32:35question and an awful lot of the
  5418. 3:32:36contingency planning efforts that went
  5419. 3:32:38into it and I reviewed it in great
  5420. 3:32:39detail
  5421. 3:32:40to assure myself that I would have some
  5422. 3:32:42working familiarity with it
  5423. 3:32:44then asked our senior leadership folks
  5424. 3:32:46to then Benchmark it against the only
  5425. 3:32:49other community I know of that is as
  5426. 3:32:51equally obsessed with safety as NASA is
  5427. 3:32:54which is the nuclear reactors Community
  5428. 3:32:57the naval reactors Community the legacy
  5429. 3:33:00of Hyman rickover and all the folks who
  5430. 3:33:02have over 40 plus years have operated
  5431. 3:33:05safely over 125 million miles they say
  5432. 3:33:09of safe operations of nuclear reactors
  5433. 3:33:12so we opposed upon Admiral skip Bowman
  5434. 3:33:14who was the head of Naval reactors today
  5435. 3:33:16who is uh rickover's successor several
  5436. 3:33:18times removed now
  5437. 3:33:20to Benchmark help us Benchmark relative
  5438. 3:33:22to uh the the approach
  5439. 3:33:26of what they use as their contingency
  5440. 3:33:30planning efforts over the course of the
  5441. 3:33:32next six months we were able to compare
  5442. 3:33:35notes if you will upgrade our plan he
  5443. 3:33:37upgraded his based on the way we do
  5444. 3:33:39business too we both benefited by the
  5445. 3:33:42exercise uh the contingency plan was
  5446. 3:33:45updated and republished in September of
  5447. 3:33:472002 we ran a simulation of it November
  5448. 3:33:51securing the confidence we'd never have
  5449. 3:33:53to use it
  5450. 3:33:54but nonetheless it was organized that
  5451. 3:33:57way and specifically all the folks who
  5452. 3:33:59were to be on the independent
  5453. 3:34:00investigation board named identified by
  5454. 3:34:02position were notified so everybody
  5455. 3:34:04understood the procedure all the folks
  5456. 3:34:07internally were exercised on the
  5457. 3:34:08activity and knew we were confident we'd
  5458. 3:34:11never have to really worry about using
  5459. 3:34:12something like this on the day it
  5460. 3:34:14occurred
  5461. 3:34:15at 9 29 Bill Reedy had it with him as
  5462. 3:34:18did all the senior officials at Kennedy
  5463. 3:34:20opened up the first page and we went to
  5464. 3:34:22item one on that contingency plan and it
  5465. 3:34:25was
  5466. 3:34:26the saddest moment I can ever recall to
  5467. 3:34:29be followed by the most tragic moment
  5468. 3:34:32I've ever experienced in my life which
  5469. 3:34:34was to face the families of these crew
  5470. 3:34:36members and but to tell them and
  5471. 3:34:38reassure them that we're working through
  5472. 3:34:40this as diligently as we know how to
  5473. 3:34:42find what caused this what are the
  5474. 3:34:45answers how are we going to fix this and
  5475. 3:34:47assure that we pursue the same dream
  5476. 3:34:48that they're their spouses loved ones
  5477. 3:34:51fathers and mothers wanted to see
  5478. 3:34:54pursued and so this plan is as good as
  5479. 3:34:56we know how to put it together it is of
  5480. 3:34:58that Legacy it has been really worked as
  5481. 3:35:01hard as we know how and the safety ethos
  5482. 3:35:03if I get slide 23 real quick to be sure
  5483. 3:35:06the example you cited the fellow you
  5484. 3:35:09talked about David Strait noticed on the
  5485. 3:35:12left hand side of this chart there's you
  5486. 3:35:14can barely even see it there's a
  5487. 3:35:16hairline fracture of no more than about
  5488. 3:35:18an inch and a half
  5489. 3:35:19that was enough to ground the entire
  5490. 3:35:22Orbiter Fleet for four months until we
  5491. 3:35:25knew what was the source of that problem
  5492. 3:35:26how did it happen is it isn't supposed
  5493. 3:35:28to have shown up in anything we stopped
  5494. 3:35:30all flight operations made the repair
  5495. 3:35:33area to it that you see on the right
  5496. 3:35:34over the course of that time after
  5497. 3:35:36they'd run many many simulations of this
  5498. 3:35:39to figure out what the right answer was
  5499. 3:35:41and yet
  5500. 3:35:43there's a bead weld right above it that
  5501. 3:35:45was there without any consequence since
  5502. 3:35:47the day this Orbiter was first put
  5503. 3:35:49together and this effect was made on all
  5504. 3:35:52four of those shuttle flights so even
  5505. 3:35:53something as minuscule as that the David
  5506. 3:35:55Strait with 20 20 Vision uh noticed as
  5507. 3:35:59he just went his through his routine
  5508. 3:36:00business like they all do of inspecting
  5509. 3:36:02the Orbiter every square inch of it
  5510. 3:36:04after every flight notice that seemingly
  5511. 3:36:07innocuous problem and that was enough to
  5512. 3:36:09ground that Fleet for four months
  5513. 3:36:11gentleman's time has expired uh Miss
  5514. 3:36:14Lofgren thank you Mr chairman I'd like
  5515. 3:36:17to thank you as well as Senator McCain
  5516. 3:36:19for convening this hearing and over the
  5517. 3:36:22next few months I think all of us will
  5518. 3:36:24be asking tough questions related to the
  5519. 3:36:27loss of the Columbia as well as the
  5520. 3:36:30future of the space program but it's
  5521. 3:36:32appropriate that first our country has
  5522. 3:36:35paused to reflect on the heroism of the
  5523. 3:36:37Seven astronauts who gave their lives so
  5524. 3:36:40that the dreams of humans reaching for
  5525. 3:36:43the Stars could live forever and my
  5526. 3:36:45thoughts and prayers are with the
  5527. 3:36:47families of those we lost as well as to
  5528. 3:36:49the extended NASA family and I know from
  5529. 3:36:53my own experience that part of our NASA
  5530. 3:36:56family at home at NASA Ames is very much
  5531. 3:36:58grieving with the rest of the country
  5532. 3:37:00over this loss I also believe that this
  5533. 3:37:04committee is going to focus on asking
  5534. 3:37:07difficult questions that relate to how
  5535. 3:37:09we're best able to resume our quest to
  5536. 3:37:12explore space and that's really the best
  5537. 3:37:15way to honor those who were lost to ask
  5538. 3:37:18those tough questions and to find
  5539. 3:37:21answers
  5540. 3:37:23clearly we're not going to find the
  5541. 3:37:25answer to the specific technical issues
  5542. 3:37:27relative to the Columbia we've got
  5543. 3:37:29technical people to do that but it is
  5544. 3:37:32appropriate for us to examine our own
  5545. 3:37:35actions and to question each other about
  5546. 3:37:38the policies and whether those those
  5547. 3:37:40policies had any impact on on the risk
  5548. 3:37:43that was inherent in this flight clearly
  5549. 3:37:47at least into the foreseeable future
  5550. 3:37:50space flight will be risky and we know
  5551. 3:37:54that the percentage of odds right now is
  5552. 3:37:58although initially we thought that the
  5553. 3:38:02use of these vehicles would have a risk
  5554. 3:38:05of one in one hundred thousand it's down
  5555. 3:38:07to now one in 57. if you just look at
  5556. 3:38:10the records and so we need to I'm a
  5557. 3:38:12Believer in human space travel but we
  5558. 3:38:14need to make sure that we're doing our
  5559. 3:38:16part to minimize the risks now I I was
  5560. 3:38:20late for this hearing I wish to
  5561. 3:38:21apologize it's been a big science day we
  5562. 3:38:24spent all morning on stem cell research
  5563. 3:38:26in the Judiciary Committee and I have
  5564. 3:38:28hopes that science will do better in the
  5565. 3:38:30science committee than science did in
  5566. 3:38:32the Judiciary Committee today but one of
  5567. 3:38:35the questions I have for you
  5568. 3:38:36administrators
  5569. 3:38:38um
  5570. 3:38:40as we look at what we should do to make
  5571. 3:38:43sure that the risks are minimized were
  5572. 3:38:45there any safety upgrade proposals ever
  5573. 3:38:49made to you either as administrator or
  5574. 3:38:52in your prior life over at the OMB that
  5575. 3:38:55you did not support and if so what were
  5576. 3:38:58those recommendations and why did you
  5577. 3:39:00reach the conclusion that you did
  5578. 3:39:02not that I'm aware of but I'd certainly
  5579. 3:39:04will review the history of both of my
  5580. 3:39:08capacities in the course of this
  5581. 3:39:10Administration and ascertain the dates
  5582. 3:39:12of when there were any deferrals or
  5583. 3:39:14anything else of uh any upgrades it
  5584. 3:39:17would be categorized as exclusively
  5585. 3:39:19focused on safety so to my knowledge we
  5586. 3:39:22have not done so there is the only
  5587. 3:39:24issues I'm aware of is a
  5588. 3:39:28electric auxiliary power unit
  5589. 3:39:31upgrade that had been planned that was
  5590. 3:39:34determined to be technically deficient
  5591. 3:39:36and wasn't no so in other words no
  5592. 3:39:38amount of money we threw at it was going
  5593. 3:39:40to yield its performance in the manner
  5594. 3:39:43in which it would contribute to not only
  5595. 3:39:45efficiency but also safety
  5596. 3:39:47characterization that was deferred and
  5597. 3:39:50we're we're now re-examining to figure
  5598. 3:39:51out how we can we can uh pick that up or
  5599. 3:39:54continue it in a future that would yield
  5600. 3:39:56the performance requirements we know of
  5601. 3:39:57but we will go back and I will submit
  5602. 3:39:59for the record any other changes that
  5603. 3:40:01were made during the course of uh well
  5604. 3:40:03since Inauguration Day 2001 and if there
  5605. 3:40:07are any changes that have occurred in
  5606. 3:40:08that time we'll certainly report those
  5607. 3:40:09so you'll go back and review the
  5608. 3:40:13your
  5609. 3:40:14obviously hindsight's 2020 we're all
  5610. 3:40:16doing that in terms of our own
  5611. 3:40:18activities what you recommended both at
  5612. 3:40:20OMB and in your role as NASA
  5613. 3:40:23administrator and I know Mike I'll do my
  5614. 3:40:25best thank you very much and my time is
  5615. 3:40:27up Mr chairman thank you very much chair
  5616. 3:40:29recognizes the senator from Washington
  5617. 3:40:31thank you Mr chairman and thank you Mr
  5618. 3:40:33O'Keefe for your diligence today I've
  5619. 3:40:36been to several meetings since I first
  5620. 3:40:37checked in here this morning and I think
  5621. 3:40:38you've had a total of a five minute
  5622. 3:40:40break so we thank you for your diligence
  5623. 3:40:43in answering these questions
  5624. 3:40:45um I don't think any of my colleagues
  5625. 3:40:47have asked specifically about the
  5626. 3:40:50Lessons Learned From The Challenger
  5627. 3:40:53inquiry and I don't know if uh in this
  5628. 3:40:58current configuration of the Columbia
  5629. 3:41:01inquiry you think that it that we have a
  5630. 3:41:05sufficient independent scientist on on
  5631. 3:41:08this review team
  5632. 3:41:10yes Senator the um very specifically the
  5633. 3:41:13contingency plan and the activation of
  5634. 3:41:15an investigative board is a direct
  5635. 3:41:17outgrowth and a direct education from
  5636. 3:41:21the Challenger accident so what we put
  5637. 3:41:24in motion on the day of the accident was
  5638. 3:41:26something that was a lesson learned from
  5639. 3:41:28Challenger it was part of the Rogers
  5640. 3:41:30commission recommendations of how we
  5641. 3:41:32would proceed in various cases and this
  5642. 3:41:34is an outgrowth of one of their concerns
  5643. 3:41:36which is how to get ahead of these cases
  5644. 3:41:38as quickly as possible
  5645. 3:41:40uh the investigative board was appointed
  5646. 3:41:42the same day as the accident and so as a
  5647. 3:41:45result that was a very clear result of
  5648. 3:41:47the lesson learned that came from that
  5649. 3:41:49so an awful lot of what we attempt to do
  5650. 3:41:52here is to to build on that experience
  5651. 3:41:54and assure that we have a result in this
  5652. 3:41:57case that is driven by our our interest
  5653. 3:42:01and absolute dedication to finding the
  5654. 3:42:03answers to what caused the terrible
  5655. 3:42:04tragedy find the the solutions to it the
  5656. 3:42:07fixes and get about the business of
  5657. 3:42:09getting back to safe flight to support
  5658. 3:42:11the folks aboard International Space so
  5659. 3:42:13who is that independent scientist then
  5660. 3:42:15oh I'm sorry the independence there is
  5661. 3:42:17uh spoke as recently as last night to
  5662. 3:42:19Admiral Hal Gaiman who is the chairman
  5663. 3:42:20of the current board who has five
  5664. 3:42:23different folks he has in mind I'm told
  5665. 3:42:25who are physicist scientists Etc that he
  5666. 3:42:28is considering uh to propose to it for
  5667. 3:42:31addition on the board I've advised him
  5668. 3:42:33whoever he wants to put on that board
  5669. 3:42:34that will expand his expertise that will
  5670. 3:42:37improve the independence of the board
  5671. 3:42:39help its objectivity we will do it
  5672. 3:42:42without qualification and without
  5673. 3:42:44hesitation well I I am struck reading
  5674. 3:42:47last night and this morning the Feynman
  5675. 3:42:49Minority Report to that report that I
  5676. 3:42:52think finally got in as an appendix and
  5677. 3:42:54which uh Mr Feynman was very critical of
  5678. 3:42:57discrepancies between engineers and
  5679. 3:42:59managers as the probability of failure
  5680. 3:43:01so you had Engineers having studies and
  5681. 3:43:03Analysis saying that maybe the risk is a
  5682. 3:43:06lot higher than than what the in the
  5683. 3:43:09high-level managers thought the criteria
  5684. 3:43:12used for flight Readiness reviews often
  5685. 3:43:14developed a gradual decreasing
  5686. 3:43:17strictness if the shuttle had flown with
  5687. 3:43:19it before chances are it worked before
  5688. 3:43:21so let's just let's not think about the
  5689. 3:43:23variations that might happen the Feynman
  5690. 3:43:26report even said NASA might have
  5691. 3:43:28exaggerated the reliability of product
  5692. 3:43:31that there were variations in models
  5693. 3:43:33that that NASA was more of a top-down
  5694. 3:43:37system in testing the entire system
  5695. 3:43:40instead of testing the individual
  5696. 3:43:43properties and limitations of the
  5697. 3:43:45material within the shuttle
  5698. 3:43:49to the degree that I think the report
  5699. 3:43:51was was quite critical of NASA in the
  5700. 3:43:55sense of maybe even coming to Congress
  5701. 3:43:57and Catering uh to us in the public
  5702. 3:44:00relations expectations that that were
  5703. 3:44:03there by the public instead of uh
  5704. 3:44:06relying back on this basic engineering
  5705. 3:44:08information so I guess my my concern is
  5706. 3:44:10is that the panel as I see it now
  5707. 3:44:13doesn't have that Feynman voice
  5708. 3:44:15and I think what we really do want to do
  5709. 3:44:18here is make sure that we are not
  5710. 3:44:21engaged in a in in that PR battle but
  5711. 3:44:24understanding how we really do build the
  5712. 3:44:27NASA systems of the future with more
  5713. 3:44:29reliability and predictability based on
  5714. 3:44:31those materials and so I'd be very
  5715. 3:44:33interested in in how those
  5716. 3:44:35recommendations were actually
  5717. 3:44:36implemented because I have a feeling we
  5718. 3:44:39might find the same circumstances are
  5719. 3:44:42true here we're going to find out that
  5720. 3:44:43there is some material
  5721. 3:44:46property limitations that were
  5722. 3:44:48discovered in some report written by
  5723. 3:44:50some engineer that somewhere along the
  5724. 3:44:52way got translated into not as big a
  5725. 3:44:54risk and thereby the disaster that we've
  5726. 3:44:58all been dealing with so I appreciate
  5727. 3:45:01your attention well thank you Senator I
  5728. 3:45:02I uh that may be if the investigative
  5729. 3:45:05board comes back and points to the
  5730. 3:45:06systemic
  5731. 3:45:08uh problems that we have we positively
  5732. 3:45:11will take that as a firm recommendation
  5733. 3:45:13and go fix it what I can advise though
  5734. 3:45:15in my one year experience with no prior
  5735. 3:45:18experience with NASA at all
  5736. 3:45:19um this my first first year at it is and
  5737. 3:45:22reading the Challenger the Rogers
  5738. 3:45:24Commission report I was a senate
  5739. 3:45:26Appropriations Committee staff member on
  5740. 3:45:28the day Challenger blew up read the
  5741. 3:45:30report thereafter and that's my only
  5742. 3:45:33association with that I'm up until a
  5743. 3:45:34year ago is what I see is a different
  5744. 3:45:37agency than what existed 17 years ago in
  5745. 3:45:41that sense one of the observations they
  5746. 3:45:43made fireman's view I think was exactly
  5747. 3:45:45right he pointed to the difficulty of
  5748. 3:45:47that that chain of command and how it
  5749. 3:45:49gets altered this whole process I've
  5750. 3:45:52witnessed and I'm advised I'm the first
  5751. 3:45:55administrator to have attended what is
  5752. 3:45:56called a flight Readiness review two
  5753. 3:45:58weeks before a launch it it resembles a
  5754. 3:46:02room like this with everyone that you
  5755. 3:46:05could possibly imagine associated with
  5756. 3:46:07this activity all of which are empowered
  5757. 3:46:10to raise their hand during the course of
  5758. 3:46:12a full day sometimes two-day review of
  5759. 3:46:15every single technical issue and if they
  5760. 3:46:18disagree with the way it was presented
  5761. 3:46:20they disagree with the conclusion they
  5762. 3:46:22immediately raised their hand and the
  5763. 3:46:24initial issue was then put to the side
  5764. 3:46:26to go work the conclusion of it that
  5765. 3:46:28didn't exist prior to Challenger it was
  5766. 3:46:30all done by telephonic lat tag up
  5767. 3:46:33occasionally this is a in the room
  5768. 3:46:35everybody there associated with the
  5769. 3:46:38activity there was a big difference at
  5770. 3:46:40that time too where scheduled drove
  5771. 3:46:41everything they were looking to get to a
  5772. 3:46:43flight rate of 20 to 30 flights a year
  5773. 3:46:45we're operating on a five to six flight
  5774. 3:46:48year of a year approach and as we just
  5775. 3:46:51discussed with Congressman Feeney a
  5776. 3:46:52minute ago and I appreciate you bringing
  5777. 3:46:53this out we stopped flight operations
  5778. 3:46:55for four months over a hairline fracture
  5779. 3:46:58found on not the Orbiter was scheduled
  5780. 3:47:00to go up but one that's in an Orbiter
  5781. 3:47:03processing facility everything ended the
  5782. 3:47:05engineer the inspector that noticed that
  5783. 3:47:07that stopped operations cold for four
  5784. 3:47:10solid months the disjointed change of
  5785. 3:47:12command that doesn't I don't see it we
  5786. 3:47:14have astronauts former astronauts who
  5787. 3:47:16are in capacities as high as the Deputy
  5788. 3:47:19Administrator the associate
  5789. 3:47:20administrator for space flight the
  5790. 3:47:22assist associate administrator for
  5791. 3:47:24safety and Mission Assurance all three
  5792. 3:47:25are former astronauts that didn't exist
  5793. 3:47:28prior to Challenger none of those those
  5794. 3:47:30positions included anybody with that
  5795. 3:47:32kind of background and all the way
  5796. 3:47:34through this process every single one of
  5797. 3:47:37those managers are empowered are
  5798. 3:47:39expected there's a responsibility that
  5799. 3:47:41each of them feel they have to stand up
  5800. 3:47:44and be counted and stop all the
  5801. 3:47:46operations until there is any issue that
  5802. 3:47:49has been left unresolved beaten to
  5803. 3:47:52ground truth so what I've seen again
  5804. 3:47:54from a from an objective opinion I think
  5805. 3:47:57until a year ago and now I'm steeped in
  5806. 3:47:59it there's no doubt about it but until
  5807. 3:48:00that time unfamiliar with it other than
  5808. 3:48:03what I read in the Challenger Rogers
  5809. 3:48:05commission report as well would tell me
  5810. 3:48:08this is a different place than what it
  5811. 3:48:09was then all that said
  5812. 3:48:11we will be guided by what the game and
  5813. 3:48:14board comebacks and comes back and tells
  5814. 3:48:15us was the problem here and if it was a
  5815. 3:48:17systemic problem we're going to fix it
  5816. 3:48:19if it was a technical problem we're
  5817. 3:48:21going to fix that too there is nothing I
  5818. 3:48:23can imagine that's not on the table and
  5819. 3:48:25I have no bias against any finding they
  5820. 3:48:28could possibly come up with that
  5821. 3:48:30wouldn't otherwise contribute to the
  5822. 3:48:31solution in this particular case we're
  5823. 3:48:33going to act on that without reservation
  5824. 3:48:35thank you very much Mr Moore
  5825. 3:48:37thank you Mr chairman thank you Mr
  5826. 3:48:39O'Keefe for staying um yesterday in the
  5827. 3:48:42Washington Post it was reported I
  5828. 3:48:44believe that you said that
  5829. 3:48:47you defended the way you set up the
  5830. 3:48:49accident investigation board arguing
  5831. 3:48:50that you proceeded the way you did so
  5832. 3:48:53that it could launch an investigation
  5833. 3:48:55immediately with members who were
  5834. 3:48:57already well briefed on shuttle
  5835. 3:48:58operations
  5836. 3:49:00I guess my question is Mr O'Keefe how
  5837. 3:49:03important it is that we launch an invest
  5838. 3:49:04investigation immediately or should we
  5839. 3:49:07take a more slow and diligent approach
  5840. 3:49:10as I think he said to Miss Sheila
  5841. 3:49:12Jackson Lee recently and I'm just I'm
  5842. 3:49:14asking what what kind of
  5843. 3:49:17what kind of Investigation do we need
  5844. 3:49:19here what's in your opinion the best
  5845. 3:49:21approach yes sir thank you
  5846. 3:49:23um I believe what I tried to say and if
  5847. 3:49:26I was inarticulate I apologized was to
  5848. 3:49:28say we we developed the contingency plan
  5849. 3:49:32to activate and investigate a board so
  5850. 3:49:34that they could act immediately get on
  5851. 3:49:35with the task immediately they are not
  5852. 3:49:37and if I said this I am an error and I
  5853. 3:49:39need to correct the record they are not
  5854. 3:49:41conversing and shuttle operations
  5855. 3:49:42there's only one member of the group who
  5856. 3:49:45is even Vaguely Familiar with NASA
  5857. 3:49:47operations the rest of them have had no
  5858. 3:49:49experience with NASA at all the chairman
  5859. 3:49:52of the board is Hal Gaiman the United
  5860. 3:49:54States Navy Admiral retired who never
  5861. 3:49:58had any association with NASA I don't
  5862. 3:49:59even think he ever attended a launch
  5863. 3:50:01before uh all of the the uh the other
  5864. 3:50:04members of the board are from the FAA
  5865. 3:50:06the Department of Transportation the
  5866. 3:50:08United States Navy the United States Air
  5867. 3:50:09Force all folks folks dealing with
  5868. 3:50:11safety Mission Assurance flight
  5869. 3:50:13certification Etc I don't know of any of
  5870. 3:50:16them even have even toured a NASA
  5871. 3:50:18facility
  5872. 3:50:19they spent
  5873. 3:50:21the past week in Shreveport Louisiana
  5874. 3:50:24and then have now just now just passed
  5875. 3:50:28Friday arrived at Johnson Space Center
  5876. 3:50:31and went through the simulation of what
  5877. 3:50:34a re-entry is like that astronaut
  5878. 3:50:36simulations they do none of them have
  5879. 3:50:37never been through that before so
  5880. 3:50:39Admiral Gaiman has advised me that part
  5881. 3:50:41of what he's done this past week is get
  5882. 3:50:42up to speed on what he calls shuttle 101
  5883. 3:50:45just to understand what the lingle means
  5884. 3:50:47and what the what the acronyms are they
  5885. 3:50:50are nonetheless were available up and
  5886. 3:50:51running and talking to each other as
  5887. 3:50:54early as seven and a half hours after
  5888. 3:50:56the accident on Friday on Saturday
  5889. 3:50:58afternoon at 5 PM they were already
  5890. 3:51:01identified and ready to go
  5891. 3:51:03so at least we picked up the time that
  5892. 3:51:05gave them the opportunity to then become
  5893. 3:51:08more familiar with the processes the
  5894. 3:51:10evidence the facts the data so they get
  5895. 3:51:12about the business of investigating as
  5896. 3:51:14quickly as possible before the trails go
  5897. 3:51:16cold
  5898. 3:51:17that's the approach that you know
  5899. 3:51:18certainly there's no one size fits-all
  5900. 3:51:21approach to this but it certainly was
  5901. 3:51:22one of the most effective ways to get
  5902. 3:51:25moving slide 33 if you would gents at
  5903. 3:51:27least this is what happened two days
  5904. 3:51:30after the event that's the folks that
  5905. 3:51:32got there and they're talking to FEMA uh
  5906. 3:51:35you know managers on site you know it at
  5907. 3:51:38least gave us an opportunity to get
  5908. 3:51:39moving as opposed to sitting around
  5909. 3:51:41thinking about who should we pick when
  5910. 3:51:43should they go
  5911. 3:51:44in terms of a realistic time frame that
  5912. 3:51:46what might Congress the American people
  5913. 3:51:48expect as to when you see this
  5914. 3:51:51investigation really getting underway
  5915. 3:51:53and I know you can't predict what
  5916. 3:51:55results we're going to find I assume you
  5917. 3:51:57can't predict what results we're going
  5918. 3:51:58to find but uh what what time frame are
  5919. 3:52:00we looking at Mr O'Keefe well the guy
  5920. 3:52:02that's right on the other side of the
  5921. 3:52:04fellow with the FEMA jacket on on right
  5922. 3:52:06ahead of him is Admiral Hal Gaiman and
  5923. 3:52:08he can answer that question better than
  5924. 3:52:10I can I wouldn't even presume to suggest
  5925. 3:52:12when he's going to finish and he has
  5926. 3:52:14there's no amount of time
  5927. 3:52:16that's necessary that we think is
  5928. 3:52:18appropriate to go out and find out what
  5929. 3:52:20happened here we're going to be guided
  5930. 3:52:22by he and his board's view of exactly
  5931. 3:52:24what occurred and there is no time limit
  5932. 3:52:26on that thank you thank you I appreciate
  5933. 3:52:28it very much thank you very much Mr
  5934. 3:52:30Moore
  5935. 3:52:31uh Mr administrator I want to thank you
  5936. 3:52:34very much before we wrap up I just want
  5937. 3:52:36to
  5938. 3:52:37touch on a couple more points I want to
  5939. 3:52:38bring Clarity to a very important issue
  5940. 3:52:41I think it should be
  5941. 3:52:43self-evident that the Congress is
  5942. 3:52:45committed to the proposition on a
  5943. 3:52:47bipartisan bicameral basis that we need
  5944. 3:52:50to strengthen the evidence supporting
  5945. 3:52:53the assertion that the Columbia action
  5946. 3:52:56investigation board is truly independent
  5947. 3:53:00I know the message has been sent and I
  5948. 3:53:05think it's been received and I know it's
  5949. 3:53:07been heard and I want some assurance
  5950. 3:53:09that it will be heated so I'd like you
  5951. 3:53:12to visit that a little bit more in
  5952. 3:53:14common I I carefully listened to you as
  5953. 3:53:18you said you will consult with Admiral
  5954. 3:53:21Gaiman but I hope you're hearing what
  5955. 3:53:23Congress is saying we are the ones and
  5956. 3:53:28others too insisting that we get some
  5957. 3:53:30clarity to this issue
  5958. 3:53:32so can you address that a little bit
  5959. 3:53:34more for me yes sir no I appreciate your
  5960. 3:53:36patience on it and I do not mean to
  5961. 3:53:38equivocate in any way shape or form I I
  5962. 3:53:41share exactly the same objective I think
  5963. 3:53:43as all members here do which is to
  5964. 3:53:45determine what are the answers to this
  5965. 3:53:48tragedy what are the facts that led to
  5966. 3:53:50it and ultimately find out how we go
  5967. 3:53:52about fixing it and getting back to safe
  5968. 3:53:54flight
  5969. 3:53:55and in that Pursuit I will not just
  5970. 3:53:57consult with Admiral game and I will
  5971. 3:53:59advise as soon as this hearing is
  5972. 3:54:01concluded I will give him a call back
  5973. 3:54:02and say my clear understanding from the
  5974. 3:54:04members of this joint committee is that
  5975. 3:54:07there are aspects of the charter that
  5976. 3:54:09need further revision let's examine what
  5977. 3:54:11those might be
  5978. 3:54:13and to his satisfaction we will make a
  5979. 3:54:15change let me give you an easy one right
  5980. 3:54:17off the bat I mean number 10 provide a
  5981. 3:54:19final written report to the NASA
  5982. 3:54:21administrator not late in 60 days first
  5983. 3:54:23of all the 60-day time frame is totally
  5984. 3:54:26unrealistic but the report
  5985. 3:54:29will come to the president to the
  5986. 3:54:32Congress to the American people and to
  5987. 3:54:34the NASA administrator simultaneous yes
  5988. 3:54:36sir all right I'll make that that
  5989. 3:54:38alteration and suggest to him that
  5990. 3:54:39that's exactly and we'll go ahead and
  5991. 3:54:41make that chart of change because again
  5992. 3:54:42I've stated that there's a letter too
  5993. 3:54:44that I I that's part of the record as
  5994. 3:54:46well that uh on the 60-day issue that
  5995. 3:54:49when I commissioned the the the the
  5996. 3:54:51panel in the very first place said our
  5997. 3:54:54contingency plan kind of played at 60
  5998. 3:54:55days but you take whatever time you
  5999. 3:54:58think you need Mr chairman Admiral to
  6000. 3:55:00come to conclusion on this I'll
  6001. 3:55:02reiterate that we will initiate the
  6002. 3:55:0460-day it has no bearing it was intended
  6003. 3:55:06as part of the the contingency plan
  6004. 3:55:09originally but not envisioned to be used
  6005. 3:55:10so to the extent that there is any
  6006. 3:55:13amount of time he needs that's what he's
  6007. 3:55:14got I don't intend to impose anything
  6008. 3:55:16you know different that's easiest one
  6009. 3:55:18you know some others that well
  6010. 3:55:19absolutely we'll revise whatever we want
  6011. 3:55:22to deal with it clearly so that it's
  6012. 3:55:25clear in our own minds that they're
  6013. 3:55:26truly independent yes they decide they
  6014. 3:55:28want to go down a certain path or they
  6015. 3:55:30want to hire a certain expert they don't
  6016. 3:55:32have to March over to NASA headquarters
  6017. 3:55:34to get approval the Admiral and and the
  6018. 3:55:37Columbia action investigation board have
  6019. 3:55:39the authority to proceed as they deem
  6020. 3:55:42best to get us the answers we are all
  6021. 3:55:46demanding and that's critically
  6022. 3:55:48important yes sir I concur I appreciate
  6023. 3:55:50it thank you well I I think as we come
  6024. 3:55:52to the end we've done several things
  6025. 3:55:54today the first and foremost the current
  6026. 3:55:57status report and obviously this is a
  6027. 3:55:59very Dynamic situation so events almost
  6028. 3:56:02change hour by hour let alone day by day
  6029. 3:56:05and so that was very important and we've
  6030. 3:56:07started what I have characterized and my
  6031. 3:56:10opening remarks as the national
  6032. 3:56:12conversation which we have to start
  6033. 3:56:15people talking to each other not through
  6034. 3:56:18each other over each other around each
  6035. 3:56:20other directly we have affirmed the
  6036. 3:56:23commitment to the concept of an
  6037. 3:56:26independent board and we've had
  6038. 3:56:28agreement on the need for Charter
  6039. 3:56:30changes I think that is very important
  6040. 3:56:33now
  6041. 3:56:35this is not the beginning of the end
  6042. 3:56:37it's the end of the beginning and we
  6043. 3:56:39always want instant analysis of
  6044. 3:56:42immediate findings and that's
  6045. 3:56:44understandable but experience tells us
  6046. 3:56:46we learn the most from in-depth
  6047. 3:56:49examination of more complete data so now
  6048. 3:56:53we are in the fact assembling phase and
  6049. 3:56:57all of us with responsibility in this
  6050. 3:56:59very important assignment the Congress
  6051. 3:57:02NASA the Columbia accident investigation
  6052. 3:57:05board are all going about the business
  6053. 3:57:08of assembling the facts then all of us
  6054. 3:57:11will have this database to look at
  6055. 3:57:15and take
  6056. 3:57:17care and caution as we go forward with
  6057. 3:57:20our special responsibilities obviously
  6058. 3:57:22NASA and the accident investigation
  6059. 3:57:25board will be focusing more on the
  6060. 3:57:27technical aspects obviously there's a
  6061. 3:57:30need on the part of the Congress to
  6062. 3:57:32focus more on policy
  6063. 3:57:35as we chart the course for the future
  6064. 3:57:38that does not mean they are mutually
  6065. 3:57:40exclusive we'll be looking at each other
  6066. 3:57:42I have been very pleasant very pleased
  6067. 3:57:46with the response I've had from Admiral
  6068. 3:57:50Gaiman assuring us that Congress will be
  6069. 3:57:52very much involved in all of the
  6070. 3:57:54proceedings I've been very pleased with
  6071. 3:57:57the cooperation we've seen received from
  6072. 3:57:59administrator O'Keefe and his team and I
  6073. 3:58:03have been just impressed Beyond any
  6074. 3:58:07ability to uh adequately explain
  6075. 3:58:11at the total commitment
  6076. 3:58:13I find on the part of every single
  6077. 3:58:16person
  6078. 3:58:17involved in this procedure
  6079. 3:58:20to get the facts
  6080. 3:58:22and let us be guided by the facts as we
  6081. 3:58:25fulfill our important responsibilities
  6082. 3:58:27Mr administrator thank you
  6083. 3:58:30hearing
  6084. 3:58:34[Music]
  6085. 3:58:51thank you
  6086. 3:59:05we'll talk about the shuttle Columbia
  6087. 3:59:06investigation on tomorrow morning's
  6088. 3:59:08Washington Journal as we're joined by

About this transcript

This page contains the full transcript of Shuttle Columbia Accident Investigation, Congressional Joint Hearing, February 12, 2003 by Space SPAN (Space Policy and News), generated from the public captions YouTube serves with the video. The transcript has 38,410 words across 6,088 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.