Project Management Complete Course 2025 (23 Hours): PMBOK 7, Agile, Practice Tests & Career Guide — Transcript
Full transcript
- 0:01[Music]
- 0:07Welcome to Introduction to Project
- 0:09Management. Are you interested in
- 0:11learning about project management? Do
- 0:13you want to learn more about what
- 0:15project managers do and how to become
- 0:16one? Maybe you're just starting and not
- 0:19sure what project management is or even
- 0:21what counts as a project. If you're
- 0:23curious about project management, the
- 0:25responsibilities of a project manager,
- 0:27the skills required to become one, and
- 0:29careers in project management, then this
- 0:31course is for you. Project management
- 0:34refers to the tools and methodologies
- 0:36used to plan and execute projects.
- 0:38Projects can be anything from the
- 0:40development of an app to the
- 0:41construction of a bridge. The important
- 0:43thing is that the projects involve tasks
- 0:45that must be accomplished to achieve a
- 0:48goal and produce some value. Nowadays,
- 0:51project management is a more valuable
- 0:53skill than ever. We live in a project
- 0:55based economy in which projects are the
- 0:57most common method of dividing work and
- 0:59producing value. Having project
- 1:02management skills makes you an
- 1:03attractive candidate for many jobs.
- 1:06Project manager roles are expected to
- 1:08only grow over the next 10 years. This
- 1:10course is divided into four modules.
- 1:13First, you'll learn the very basics of
- 1:15project management like what project
- 1:17management is. In the second, you'll
- 1:20learn about the role played by project
- 1:21managers in the workplace, different
- 1:23project management methodologies, and
- 1:25current trends in project management.
- 1:28Next, the course will cover the skills
- 1:30and responsibilities expected of a
- 1:32project manager. The final module will
- 1:35describe different career opportunities
- 1:36in project management so you will be
- 1:38prepared to progress in your project
- 1:40management career after finishing this
- 1:42course. This course uses various
- 1:45teaching methods, including videos,
- 1:47reading activities, quizzes, a final
- 1:49project, and interviews with project
- 1:51management experts. Let's briefly hear
- 1:53these excerpts introduce themselves. You
- 1:55will hear more from them as the course
- 1:57progresses.
- 1:58>> Hi, I'm Greg Akunia. I'm a project
- 2:00manager with over 20 years experience,
- 2:03and I'm currently working on my own
- 2:04project called Planet Earthlings. We
- 2:06make social impact games.
- 2:08>> Hello, my name is Katherine Brooks. I'm
- 2:10a senior project manager at Zcaler.
- 2:14Hi, my name is Erikica Maldonado and I'm
- 2:16a program manager at Corsera. Hi, I'm
- 2:20Casey and I currently work as a business
- 2:22consultant as well as a subject matter
- 2:26expert doing course development. In the
- 2:29past, I've worked as a business
- 2:31consultant doing project management and
- 2:33program management for large companies
- 2:36as well as helping companies do agile
- 2:39transformations where they move from a w
- 2:42waterfall project management methodology
- 2:44to an agile methodology.
- 2:47>> Hello everyone, my name is Daniel
- 2:49Yman's. I'm currently a subject matter
- 2:51expert working with skill up
- 2:53technologies. However, I'm also a
- 2:56professor. I work for about four
- 2:59different universities in the greater
- 3:01Seattle area. I do continuing education,
- 3:04I do corporate training, and in
- 3:07addition, I also perform course
- 3:09development.
- 3:10>> Once you have completed this course, you
- 3:12will receive a badge and certificate
- 3:14that can be shared with prospective
- 3:15employers to demonstrate your knowledge
- 3:17of project management. Get ready for the
- 3:19next step in your project management
- 3:21journey and good luck.
- 3:27[Music]
- 3:34Welcome to what is project management.
- 3:37After watching this video, you will be
- 3:39able to define project management,
- 3:42identify the six types of project
- 3:44management constraints, explain the
- 3:46benefits of effective project
- 3:47management.
- 3:49The project management institute defines
- 3:51project management as follows. Project
- 3:54management is the use of specific
- 3:56knowledge, skills, tools, and techniques
- 3:59to deliver something of value to people.
- 4:02Examples of projects might include the
- 4:04development of software, the
- 4:06construction of a building, or a relief
- 4:08effort after a natural disaster.
- 4:10Projects can be generally defined as a
- 4:12collection of tasks, activities, and
- 4:14deliverables that must be carefully
- 4:16organized and executed to produce value.
- 4:19Project managers are the people
- 4:21responsible for managing this
- 4:22organization and the delivery of
- 4:24projects.
- 4:26Because project management is first and
- 4:28foremost about the management of
- 4:30projects, this makes it distinct from
- 4:32general or operations management. While
- 4:34general management involves the ongoing
- 4:36management of a team, project management
- 4:39begins and ends with the project.
- 4:42Project management begins when a project
- 4:43is kicked off and it ends when all
- 4:46project requirements have been completed
- 4:47to the customer's satisfaction.
- 4:50Although the informal process of
- 4:51managing projects has existed for
- 4:53centuries, project management as a
- 4:55distinct practice emerged in the
- 4:57midentth century. It was born out of a
- 5:00need in the aerospace, engineering,
- 5:02pharmaceutical, and telecommunications
- 5:04industries to manage projects of
- 5:06increasing complexity.
- 5:08Effective project management allows
- 5:10companies to increase the success rate
- 5:11of projects, mitigate project risks, and
- 5:14reduce overall costs. For team members,
- 5:18effective project management allows them
- 5:19to better understand their roles and
- 5:21responsibilities, collaborate, and
- 5:23utilize resources.
- 5:25A key aspect of project management is
- 5:28understanding your project's
- 5:29requirements. The entire team should
- 5:31agree on the project's goals. Often
- 5:34projects are kicked off by developing
- 5:36requirements.
- 5:38Today projects are everywhere. We live
- 5:40in a project economy in which projects
- 5:43are the primary method by which work is
- 5:44accomplished and value is produced.
- 5:47Project management skills are key for
- 5:49success in a project-based economy.
- 5:52Project management involves a range of
- 5:54skills including technical knowledge to
- 5:56interpersonal skills. As a result, it is
- 5:59relevant to a wide variety of roles and
- 6:01situations. Learning project management
- 6:03can be helpful to everyone, ranging from
- 6:06a student working on a science project
- 6:07to an executive negotiating personality
- 6:10disputes.
- 6:11Project management helps prevent
- 6:13organizations from simply jumping into a
- 6:15new project without a plan. Without
- 6:17proper management, many projects fail to
- 6:19meet their original objectives, if they
- 6:21are completed at all. Project management
- 6:23provides focus and direction for the
- 6:25project team. It allows businesses to
- 6:27outline their requirements from the
- 6:29beginning, apply project management
- 6:30techniques, and monitor project
- 6:32activities. This mitigates risk by
- 6:34preventing resources from being wasted
- 6:36or put into failed projects.
- 6:39Project management may reduce risks, but
- 6:41it does not guarantee that projects will
- 6:43not encounter any problems or surprises.
- 6:46Project management will however provide
- 6:48standardized practices that can be used
- 6:50to respond to and prevent risk.
- 6:53There are six types of constraints to
- 6:55keep in mind when planning a project.
- 6:57These are cost, scope, project quality,
- 7:00risk, resources, and time. Cost is the
- 7:04project's budget. Project management
- 7:06balances the budget so that projects
- 7:08neither overspend nor underspend. Scope
- 7:11is both the desired features and
- 7:13functions of the final product and the
- 7:15work required to deliver them.
- 7:17Accurately estimating scope is a crucial
- 7:19part of the planning process. Project
- 7:22quality refers to the standards the
- 7:24project must meet to be effective. The
- 7:26final product must be able to accomplish
- 7:28its intended task, deliver the expected
- 7:30benefits and value or both. It must
- 7:32additionally meet certain levels of
- 7:34availability, reliability, and
- 7:36maintainability. Managing risk means
- 7:39addressing external factors that can
- 7:41potentially harm your project. It refers
- 7:43to both the probability of these
- 7:45negative events and the consequences if
- 7:47they do. Resources are what is needed to
- 7:50accomplish the project. This includes
- 7:51people, equipment, facilities, funding,
- 7:54and anything else required to deliver
- 7:56the final product. Time is the time
- 7:59needed to finish a project. Tasks and
- 8:01their estimated durations must be
- 8:03accurately identified and estimated to
- 8:05ensure that projects stay on schedule.
- 8:07Balancing these six types of constraints
- 8:09throughout project delivery is the
- 8:11challenge that project managers address.
- 8:14The benefits of effective project
- 8:16management include managing budgets and
- 8:19timelines so that projects are able to
- 8:21be successfully completed within the
- 8:22planned budget and time frame. Improving
- 8:25productivity, efficiency, and quality of
- 8:28work. Addressing project risks
- 8:30proactively, improving communication
- 8:32between team members and with
- 8:34stakeholders, increasing customer
- 8:36satisfaction by planning and meeting
- 8:38expectations.
- 8:40In this video, you learned that project
- 8:42management is the application of
- 8:44knowledge, skills, and tools to a
- 8:47project to deliver intended outcomes and
- 8:49produce value. Considers constraints
- 8:52including cost, scope, quality, risk,
- 8:55resources, and time. Has many benefits
- 8:59including managing budgets and
- 9:00timelines, improving productivity,
- 9:02addressing project risks, improving
- 9:04communication, and increasing customer
- 9:06satisfaction.
- 9:08[Music]
- 9:18Welcome to expert viewpoints. What do
- 9:21project managers do? In this video, we
- 9:25will hear from several project managers
- 9:27explaining what project managers do and
- 9:29discussing examples of their involvement
- 9:31with their projects.
- 9:33If you ever have an opportunity to go
- 9:35ahead and talk with any kind of an
- 9:37experienced project manager, ask them
- 9:40what their job description is. In most
- 9:42cases, you'll hear something like, "My
- 9:45job is to go ahead and provide new
- 9:47products and new services on time,
- 9:50within budget, and hopefully within the
- 9:53schedule timelines that the customer
- 9:56requires.
- 9:57Project managers are responsible for
- 10:00scheduling organization of the overall
- 10:03project and in reality they're actually
- 10:05owners of the project and are held
- 10:08responsible. Many projects require
- 10:11budgeting, making sure we have resource
- 10:13alignment, building those relationships
- 10:16between business stakeholders and
- 10:18internal stakeholders.
- 10:20>> I like to believe that project managers
- 10:22are the cement that hold everything
- 10:24together.
- 10:26uh you're the person who's
- 10:28in the middle organizing everything and
- 10:32bringing all the necessary elements
- 10:35together for successfully completing uh
- 10:38the work at hand. Uh and this means that
- 10:41you're working with everyone from upper
- 10:44management down to every member of your
- 10:47team and figuring out how do you get
- 10:50them into the optimum position for doing
- 10:53the very best work.
- 10:55Next, we will hear about examples of
- 10:58projects that these experts worked on,
- 11:00and they will tell us a little bit about
- 11:02their involvement as a project manager.
- 11:05It starts right from the beginning. We
- 11:06work internally with crossf functional
- 11:08teams including our sales team, our
- 11:11pre-sales team, the consultants, even
- 11:13our technical account managers for some
- 11:16or customer success managers. We go
- 11:18ahead and start building the internal
- 11:20relationship. From the kickoff call, we
- 11:22build an external relationship with our
- 11:24stakeholders.
- 11:25We also help with scheduling, organizing
- 11:28everything, making sure everybody is
- 11:30involved that should be on the calls or
- 11:33just should be notified for any
- 11:35reporting.
- 11:37So recently, I worked with a small
- 11:39company to help them move their systems,
- 11:42move their customer information to a new
- 11:45customer relationship management tool.
- 11:48So there was some technology that was
- 11:51being changed. Uh we needed to train
- 11:54their employees on a new system and
- 11:58there was lots to be done in terms of
- 12:01creating some automations, transferring
- 12:03the data and uh really doing that
- 12:06training and creating things like FAQs
- 12:08and documentation.
- 12:10One of my roles for the project was to
- 12:13be the project manager. And so the first
- 12:15thing that I did was I met with the
- 12:18company, met with a couple of people on
- 12:20the team.
- 12:21One of the first things that I did was
- 12:23meet with some people on the team to
- 12:25talk about what the project objectives
- 12:27were, what our project goals were, and
- 12:30kind of get a basic sense of the
- 12:32timeline.
- 12:33>> Now, let me tell you about a project I
- 12:36did years ago because it was really an
- 12:38epiphany about what makes a great
- 12:41project manager. Uh years ago, I was
- 12:44specializing in fixing troubled
- 12:46projects, projects that were over
- 12:48budget, behind schedule, and I was down
- 12:51in Sarasota, Florida, managing a uh HR
- 12:54software development project for Arthur
- 12:56Anderson. And the project was millions
- 12:59of dollars over budget and over a year
- 13:02behind schedule.
- 13:04Within 3 weeks, everything was ticking
- 13:08and everyone was shocked that the
- 13:10project was back on schedule and was
- 13:13hitting deadlines uh every week uh
- 13:18finishing key pieces of it. And what I
- 13:21found was the most important thing that
- 13:24a project manager can do is being the
- 13:28person who can translate between the
- 13:31business and the dev team in a way that
- 13:35makes it possible for everybody to get
- 13:37what it is they want. Recently working
- 13:40for Green River College here in the
- 13:43Seattle area, the college and I decided
- 13:46that perhaps coming up with a new
- 13:49continuing education program for a
- 13:51business analyst track was a very very
- 13:54good idea. We used something called the
- 13:57PDCA methodology. PDCA plans for plan,
- 14:01do, check, act. And this is a
- 14:04methodology that is tried and true.
- 14:08First of all, we did our planning. We
- 14:10took a look at the potential curriculum,
- 14:13the potential audience, how long this
- 14:15particular course should take. Then we
- 14:19went into the D, which stands for do. We
- 14:22developed all of the different
- 14:23courseware. The next step was C, which
- 14:26plans for check. What we did was we ran
- 14:29a quick beta class. We got feedback from
- 14:32a lot of the different participants. We
- 14:35upgraded what we needed to go ahead and
- 14:38fix. And then finally, the A was act.
- 14:41We're now ready to go ahead and roll out
- 14:43this new curriculum on a full-time
- 14:45basis.
- 14:47An example of a project that I have
- 14:49worked on is a cyber security course in
- 14:52a cyber security program for UC
- 14:54Berkeley. And my involvement in that
- 14:57process was working with ex external
- 15:00stakeholders which were the faculty
- 15:02working with our internal stakeholders
- 15:04which were several different types of
- 15:06roles. They were people who were working
- 15:07on graphics for that course, people who
- 15:09were working in production for that
- 15:11course and then people who were also on
- 15:12the support end. So my role was to make
- 15:16sure that external stakeholders were
- 15:17very clear on the different milestones
- 15:19that they had to accomplish in order to
- 15:21make sure that the internal stakeholders
- 15:23were able to do their job and that we
- 15:25were able to successfully launch the
- 15:27course on time for our online students.
- 15:34[Music]
- 15:40Welcome to program, project, portfolio.
- 15:43What's the difference? After watching
- 15:46this video, you will be able to compare
- 15:48and contrast a program, a project, and a
- 15:51portfolio in project management and
- 15:54differentiate between project, product,
- 15:57and portfolio managers.
- 16:01The terms project, program, and
- 16:03portfolio are often confused or used
- 16:06interchangeably. However, these terms
- 16:08have distinct meanings in the context of
- 16:10project management.
- 16:12First, what is a project? The project
- 16:15management institute, also known as PMI,
- 16:19defines a project as a temporary
- 16:21endeavor undertaken to create a unique
- 16:23product, service, or result.
- 16:28Projects are temporary, meaning they
- 16:30have a clear beginning and end. They are
- 16:32complete when the project goals are
- 16:34achieved or when the project is no
- 16:36longer viable. Projects can stand
- 16:38independently or be part of a larger
- 16:41program or portfolio. A successful
- 16:43project meets or exceeds the
- 16:45stakeholders expectations.
- 16:48Projects are distinct from operations.
- 16:50To determine if what you are working on
- 16:52is a project, ask yourself the following
- 16:54questions. Is it unique? Is there a way
- 16:57to determine when the project will be
- 16:59completed? Is there a way to measure
- 17:01stakeholder satisfaction? It is a
- 17:04project if you have answered yes to all
- 17:06these questions.
- 17:08An example of a project might be a
- 17:10social media campaign for a product.
- 17:12This meets all three criteria from the
- 17:14previous slide. It is unique because the
- 17:17product will launch only once. It has an
- 17:20end state because after launch the
- 17:22project concludes and produces
- 17:24measurable value such as the percent
- 17:26increase in product usage after the
- 17:28campaign.
- 17:30Next, a program is a group of similar or
- 17:33related projects managed as a group
- 17:35rather than independently. Programs are
- 17:38most useful when a group of projects
- 17:40sees benefits from being managed that it
- 17:42wouldn't see individually. The goal of a
- 17:44program is to realize the advantages for
- 17:46the entire organization. Implementing
- 17:49programs makes it easier to determine
- 17:51which projects produce value for the
- 17:52business. Like projects, programs are
- 17:55temporary organizations. When all
- 17:57projects in a program are complete, the
- 18:00program is also complete. All programs
- 18:03share four traits. They are large,
- 18:06incorporating multiple projects with a
- 18:08wide scope. Long-term as it takes a
- 18:11while for a business to see the benefits
- 18:13from multiple projects. General, able to
- 18:17encompass a range of relevant projects.
- 18:20Strategic, serving the overall strategic
- 18:22goals of the organization rather than a
- 18:24single project.
- 18:26An example of a program might be all
- 18:29marketing campaigns that use multiple
- 18:31channels for a single product, including
- 18:33social media platforms, digital
- 18:35advertising, and print advertising.
- 18:39While the individual marketing campaigns
- 18:40in each channel serve as separate
- 18:42projects, together they form a single
- 18:45marketing program.
- 18:47By contrast, a portfolio is a group of
- 18:50programs and projects within the same
- 18:52organization. These programs and
- 18:54projects may or may not be related. Like
- 18:57programs, portfolios are useful when a
- 18:59group of projects and programs would
- 19:01benefit from being managed as a whole.
- 19:03Unlike programs and projects, managing a
- 19:06portfolio is a continuous process, and
- 19:09new programs and projects are included
- 19:10in the portfolio as they are started.
- 19:13All portfolio elements must align with
- 19:15the company's overall strategy and
- 19:17goals. The goal of a portfolio is to
- 19:20help an organization meet its long-term
- 19:21objectives. If a project is a social
- 19:24media campaign and a program is the
- 19:27entire marketing campaign on multiple
- 19:29channels, then a portfolio would be all
- 19:31the projects and programs that concern
- 19:34the product. A portfolio could include
- 19:36all social media campaigns for all of
- 19:38the organization's products. This might
- 19:40include marketing and other departments
- 19:43such as production, design, and
- 19:45distribution.
- 19:46As there are differences between a
- 19:48project, program and portfolio, there
- 19:50are differences between a project
- 19:52manager, program manager, and portfolio
- 19:55manager. A project manager has a
- 19:57responsibility to ensure that an
- 19:59individual project is managed within
- 20:01time, cost, and quality constraints.
- 20:03They typically focus on how to get work
- 20:05done at a tactical level, and their
- 20:08day-to-day tasks mainly focus on
- 20:10timelines, resource allocation, and
- 20:12assigning tasks. A program manager on
- 20:16the other hand is responsible for
- 20:17ensuring a larger group of projects is
- 20:19completed. They are focused on ensuring
- 20:22that the overall program is meeting key
- 20:24business objectives. Their day-to-day
- 20:26tasks mainly involve resource management
- 20:28across multiple projects, improving
- 20:30processes and tools, and tracking
- 20:32long-term timelines and large budgets. A
- 20:35portfolio manager is responsible for
- 20:37ensuring that groups of programs that
- 20:39may not be related to one another are
- 20:41being delivered and that they are
- 20:43contributing to broader business
- 20:44objectives. They are primarily focused
- 20:46on ensuring that the portfolio of
- 20:48programs is aligned to the overall
- 20:50organizational strategy. Daytoday they
- 20:53meet with executives, build portfolio
- 20:55level road maps to provide direction to
- 20:57programs and project managers and track
- 21:00and balance resources and costs across
- 21:02multiple programs.
- 21:04In this video, you learned that a
- 21:07project is an endeavor that is unique,
- 21:09temporary, completable, and measurable.
- 21:12A program is a collection of projects
- 21:15that is large, long-term, general, and
- 21:18strategic projects. A portfolio is a
- 21:21collection of projects and programs that
- 21:23is ongoing and aligns with the
- 21:25organization's strategic objectives.
- 21:32[Music]
- 21:37Welcome to the role project management
- 21:39plays in projects. After watching this
- 21:42video, you will be able to list traits
- 21:45of successful project management.
- 21:47Explain the six aspects of a project
- 21:49that a project management addresses.
- 21:51Explain the purpose of monitoring and
- 21:53reporting on a project. As you have
- 21:56learned previously, project management
- 21:58is utilizing skills, tools, and
- 22:00knowledge to manage projects
- 22:02successfully. It is used not to manage
- 22:05day-to-day operations, but to manage
- 22:07temporary and unique projects. Karen
- 22:10Tate is president and founder of the
- 22:12Griffin Tate Group Incorporated, a
- 22:14project management institute charter
- 22:16global registered education provider
- 22:18specializing in training for the project
- 22:20management community. She says, "Trying
- 22:23to manage a project without project
- 22:25management is like trying to play a
- 22:27football game without any game plan.
- 22:30Successful project management helps
- 22:32create successful projects. Project
- 22:34management aims to prevent projects from
- 22:37going over budget or running late.
- 22:39Provide tools like work breakdown
- 22:41structures, client information sheets,
- 22:43and project plans to help teams navigate
- 22:46their work. Clarify roles and
- 22:48responsibilities across the team.
- 22:51Communicate across all project team
- 22:52members and key stakeholders to build
- 22:54alignment.
- 22:56Manage how the project is delivered,
- 22:58including clarifying dependencies and
- 23:00downstream impacts. Assess and manage
- 23:03risks and issues that the project faces.
- 23:06Drive quality assurance for the outputs
- 23:08of the project. Monitor and report on
- 23:11results to the team, leadership, and key
- 23:13stakeholders. The purpose of a project
- 23:16is to achieve a particular objective and
- 23:18to produce measurable value. The
- 23:21objective of project management on the
- 23:23other hand is to control how these
- 23:25project goals are achieved. Project
- 23:27management is about estimating and
- 23:29controlling six constraints. Scope,
- 23:32schedule, financials, risk, quality, and
- 23:36resources.
- 23:37The project scope establishes
- 23:39objectives, requirements, and extent of
- 23:42the work. A project schedule determines
- 23:45how and when the work is executed.
- 23:48Project financials determine how much
- 23:50can be spent to achieve the project's
- 23:52goals and should be managed for
- 23:53budgeting purposes.
- 23:55A project risk assessment identifies any
- 23:58events that may have a negative impact
- 24:00on any other of the project constraints
- 24:02and puts a plan in place to mitigate
- 24:04those risks.
- 24:06Project quality includes the standards
- 24:08and criteria set by stakeholders and is
- 24:10managed through quality assurance
- 24:12processes that review a project's
- 24:14performance on a regular basis.
- 24:16Lastly, the project's resources include
- 24:19the people, equipment, or technology
- 24:21required to complete a project. You've
- 24:24learned that an example of a project
- 24:26would be a social media campaign for a
- 24:28product. The successful completion of a
- 24:30social media campaign project would
- 24:32involve determining the objectives of
- 24:34the social media campaign and any
- 24:36requirements and scheduling social media
- 24:38campaign releases. It would also include
- 24:41estimating the cost, ensuring the social
- 24:43media meets the organization's quality
- 24:45standards, assessing risks such as
- 24:47making sure advertised assets are in
- 24:49place in a timely fashion, and
- 24:51allocating the appropriate personnel for
- 24:53the work. Monitoring the status of a
- 24:56project is crucial to project
- 24:57management. In order to control these
- 24:59six constraints, projects must be
- 25:02regularly monitored. While monitoring a
- 25:04project's progress against the required
- 25:06objectives and deliverables, project
- 25:08managers may find they need to adjust
- 25:09the project schedule or budget.
- 25:11Monitoring may also identify risks or
- 25:14resource issues that may require
- 25:16requirements to be altered. When
- 25:18monitoring a project's progress, project
- 25:20reporting is regularly needed to
- 25:22communicate the project's status to the
- 25:24team and stakeholders. Reports should
- 25:26maintain and update the project schedule
- 25:28and progress against the requirements
- 25:30and deliverables. Reports may also
- 25:32contain budget information. As a project
- 25:35schedule and budget are living
- 25:36documents, they may change as the
- 25:38project progresses. Reporting
- 25:40communicates these changes regarding the
- 25:42project to the team. Regular reporting
- 25:44should convey information that
- 25:46accurately assesses, reports on, and
- 25:48notifies team members about any other
- 25:51changes to the project as necessary.
- 25:53Project managers may use digital tools
- 25:56to monitor and report on their projects.
- 25:58Project management monitoring tools are
- 26:00used to track the tasks, due dates, who
- 26:03is responsible, spending, issues, and
- 26:06status of project assets. For reporting,
- 26:10they may have a presentation template
- 26:12they update weekly to communicate the
- 26:14status and issues to key stakeholders.
- 26:17They may also have email templates they
- 26:19use to send out reports on a regular
- 26:21cadence. In this video, you learned that
- 26:24successful project management keeps
- 26:26projects within budget and on time,
- 26:28provides needed tools to the team,
- 26:30clarifies responsibilities, facilitates
- 26:32communication, manages delivery and
- 26:35risks, drives quality, and monitors and
- 26:38reports results. Project management
- 26:40seeks to control the scope, schedule,
- 26:43financials, risk, quality, and resources
- 26:46of the project.
- 26:48Monitoring is used to assess the
- 26:50progress of a project against its
- 26:51deliverables. Whereas reporting
- 26:53communicates this progress to the team.
- 27:00[Music]
- 27:05Welcome to expert viewpoints. What's a
- 27:07project? In this video, we will hear
- 27:10from project managers describing what a
- 27:12project entails and the role project
- 27:14management plays in a project success.
- 27:17Question number one is what's a project?
- 27:20For me to correctly respond to that
- 27:22question, I'll share the project
- 27:24management institutees three-phaseed
- 27:26definition of a project. First and
- 27:28foremost, a project is unique. Every
- 27:31project is different. A project manager
- 27:34needs to really understand how each
- 27:36project is different and tailor their
- 27:38planning accordingly. Secondly, every
- 27:41project has a defined beginning and a
- 27:43defined end. It's very very important
- 27:46for the project manager to not only
- 27:48understand when the project begins but
- 27:50how it's going to end as well. What will
- 27:53you do with the final product or
- 27:55service? Who will you transition it to?
- 27:58The third piece of the PMI definition is
- 28:01all projects are achieved through
- 28:03progressive elaboration. What do we mean
- 28:06by that? When we first begin a project,
- 28:08we really don't understand what the
- 28:10total scope of the project is. The first
- 28:12step that you're going to take is
- 28:14creation of a project charter. This
- 28:16explains the scope at a very very high
- 28:18level. Progressive elaboration means
- 28:21that as we continue to go ahead and
- 28:23understand the details of the project,
- 28:26we become more and more detailed and
- 28:28more and more granular until at the end
- 28:31we have a project plan that is detailed
- 28:33to the point where you can execute the
- 28:35project.
- 28:36>> Simply put, it's a sync task that have
- 28:39an outcome. with that. It could be easy
- 28:41as making a PB&J.
- 28:44Okay? So, you start with two slices of
- 28:46bread, peanut butter, and jelly. But
- 28:49it's the overall outcome. How do you go
- 28:51ahead and create the task in order to
- 28:53complete your PB and jelly? That way,
- 28:55you can enjoy it.
- 28:57>> A project can be called any work that is
- 29:01gathered around a specific set of goals.
- 29:04So what is it that the business wants to
- 29:06accomplish and putting it together and
- 29:09understanding how you're going to
- 29:10accomplish it?
- 29:11>> So in my experience as a project
- 29:13manager, a project is something that
- 29:17really kind of has an end date. It has a
- 29:20specific goal that a team or a company
- 29:24is trying to accomplish. And it's really
- 29:27something that is pretty contained in
- 29:30and of itself.
- 29:31>> A project can be anything. My focus has
- 29:33been in online learning but a project
- 29:35can be anything that has a deadline that
- 29:38is going to mark its launch or its
- 29:41delivery. So my focus has been in
- 29:44digital products for online learning but
- 29:46it can be anything.
- 29:48>> What role does project management play
- 29:50in a project success?
- 29:53>> One of the things that you'll learn is
- 29:56RACI RAI. This is a way of defining
- 29:59roles and responsibilities for a
- 30:02particular team member. R stands for
- 30:04responsible, A accountable, C consult
- 30:07and I inform.
- 30:10In a nutshell, the project manager is
- 30:12responsible to do work, accountable for
- 30:15the outcomes of the work, a consultant
- 30:18in terms of providing expertise and
- 30:20needs to be a provider of information
- 30:23and a receiver of information as well.
- 30:26We are the key responsible players that
- 30:28are responsible for the overall project
- 30:30itself. When it comes to the outcome,
- 30:33somebody is going to have to go
- 30:34somewhere and be like, who's
- 30:36responsible? They go to the project
- 30:38manager. They have to manage scope,
- 30:41budget, and schedule in order to have a
- 30:44successful project. Sometimes we might
- 30:46go a little bit out of budget, but where
- 30:48do we budget out from? Is it going to be
- 30:51from the scope and we're going to do
- 30:53less scope or do we slow down the
- 30:56schedule or speed it up if we have an
- 30:58increased budget?
- 31:00>> So this can you know vary from team to
- 31:03team project to project but very often
- 31:07includes the project manager in
- 31:09gathering the business requirements
- 31:10working with the business analysts and
- 31:12the business side all the way up to the
- 31:14seauite to understand what the business
- 31:16wants and then starting the planning.
- 31:19You have everything from the diplomacy
- 31:21that you have to do in terms of working
- 31:23and inspiring those that are on your
- 31:26team to dealing with troubleshooting
- 31:28when things go wrong. And
- 31:30>> I believe that a a good project manager
- 31:32really helps make a project successful
- 31:35because they help move that project
- 31:37along. They help resolve any issues or
- 31:40blockers. They have relationships with
- 31:43all of the stakeholders and they're
- 31:45really able to get clarification on
- 31:48questions. If members of the team have
- 31:50questions, they're able to resolve
- 31:52issues. If people on the team have
- 31:54issues, they're the person making sure
- 31:57that all of the different stakeholders
- 31:59are keeping to their milestones and
- 32:03ultimately they're the one responsible
- 32:05or at least one of the people
- 32:07responsible for making sure that the
- 32:09product launches on time. And if for any
- 32:12reason it doesn't launch on time, that
- 32:14the proper communication channel has
- 32:16been opened so that if it's not going to
- 32:18happen on time, that there's a plan,
- 32:20that someone knows that it's not going
- 32:22to happen on time, and that there's a
- 32:23plan B. So, they're the person shuffling
- 32:26every single different step along the
- 32:28way, making sure that everyone is
- 32:30successful.
- 32:36[Music]
- 32:42Welcome to expert viewpoints,
- 32:44misconceptions about project management.
- 32:46In this video, we will hear from project
- 32:49managers discussing some common
- 32:51misconceptions about project management
- 32:53and tasks that fall outside the purview
- 32:55of a project manager's responsibilities.
- 32:58>> That's a very easy response for me. One
- 33:01of the biggest misconceptions is that a
- 33:03project manager has to be the expert.
- 33:06The project manager needs to be
- 33:09understanding of all aspects of
- 33:11everything that is happening in the
- 33:13project. That is a huge misconception.
- 33:16One of my favorite quotes that I've
- 33:17heard in the past is know what you know,
- 33:20know what you don't know, and surround
- 33:21yourself with people who know what you
- 33:23don't know. A good project manager does
- 33:25not quote unquote bite off more than he
- 33:28or she can chew. You need to be in
- 33:31control of the project. You need to make
- 33:33sure that all of the different moving
- 33:35parts are moving in the right direction.
- 33:38You do not necessarily have to be the
- 33:40expert.
- 33:41>> A lot of the times in terms of their own
- 33:44workload, a lot of people uh have this
- 33:47kind of misconception that project
- 33:50managers are there micromanaging
- 33:53uh people on the team. And the most
- 33:55successful project managers that I've
- 33:57seen really are there with not only a
- 34:01vision but a very clear directive. And
- 34:04then once the team has that directive
- 34:06and and they have all the information
- 34:08they need, they're able to really
- 34:11self-manage even more successfully and
- 34:14efficiently than if they don't have that
- 34:17information. A lot of it has to do with
- 34:20the idea that people expect that if
- 34:21you're a project manager that you've
- 34:24basically planned out the entire P
- 34:27project and scheduled everything.
- 34:30>> Some misconceptions about project
- 34:32management are that they are the manager
- 34:36of every single person uh on the
- 34:38project. So an important thing to know
- 34:41about a project manager is that while
- 34:43they're communicating with different
- 34:44stakeholders along the way, they are
- 34:47quite often and most often not the
- 34:50actual manager of those different
- 34:52stakeholders. So they're managing the
- 34:54task, managing the timeline, but they're
- 34:56not the direct managers of the different
- 34:59people involved. So they have to
- 35:01communicate if necessary, if there's any
- 35:03escalations with those stakeholders
- 35:06managers. So there's a separate kind of
- 35:09dotted line with these roles.
- 35:14>> What falls outside the scope of project
- 35:16management?
- 35:17>> We always want to plan prior. We work
- 35:20out with the statement of work if there
- 35:22is one. We go ahead and all agree as far
- 35:25as the scope and then we move forward
- 35:28with implementation. Anything outside of
- 35:31the agreed upon scope is technically
- 35:34considered as either scope creep or just
- 35:36out of scope altogether.
- 35:39I think project managers while they are
- 35:42responsible for resourcing things like
- 35:45resourcing and budgets, they aren't HR
- 35:48professionals or finance professionals.
- 35:52So they need to have great relationships
- 35:55with people in HR and in the finance
- 35:58department, but uh they don't need to be
- 36:02responsible or something that falls
- 36:04outside of the scope of project
- 36:06management is for them to really have
- 36:09those skill sets in human resources and
- 36:13finance.
- 36:14>> In terms of what falls outside the realm
- 36:17of project management, my opinion is
- 36:20nothing. There's uh as a project
- 36:22manager, I've been called to add value
- 36:26everywhere from ideiation all the way
- 36:29down to final distribution of uh a
- 36:32product, a website, a piece of software.
- 36:35So, as a project manager, my feeling is
- 36:39you have to be ready to do whatever it
- 36:41takes to get the job done.
- 36:44What falls outside of the scope of
- 36:46project management is direct leadership
- 36:50to different stakeholders. So as I
- 36:53mentioned previously, stakeholders are
- 36:56not managed by project managers. The
- 36:59project manager is focused on the
- 37:00timeline. So the project manager does
- 37:02not have to be responsible for
- 37:06different parts of each m each each
- 37:09stakeholder's jobs. They're only focused
- 37:12on the timeline on communicating
- 37:15obstacles across the team and making
- 37:18sure that they're removing those
- 37:20obstacles. But they are not the actual
- 37:23leadership member that is directly
- 37:27involved with managing each stakeholder.
- 37:34[Music]
- 37:39Welcome to who project managers work
- 37:42with. After watching this video, you
- 37:44will be able to list who project
- 37:46managers interact with when managing
- 37:48projects. Summarize the types of
- 37:51interactions project managers have with
- 37:52those they work with. Stakeholders are
- 37:55individuals, groups, and organizations
- 37:58that can impact or be impacted by a
- 38:00project. This can include impact during
- 38:02the production of the project or it can
- 38:04include impact after the completion of
- 38:06the project. Basically, anyone involved
- 38:08with the project is a stakeholder.
- 38:11Engaging with stakeholders is essential
- 38:12to managing projects. Project managers
- 38:15must be able to effectively identify,
- 38:17analyze, and proactively engage with
- 38:19stakeholders from the beginning to the
- 38:21end of the project. By effectively
- 38:24interacting with various stakeholders,
- 38:26project managers and stakeholders alike
- 38:28can align their goals with the project's
- 38:29objectives. This also allows the project
- 38:32team to adjust the project in response
- 38:33to changes and new developments. Some
- 38:36key individuals and teams that the
- 38:38project manager interacts with include
- 38:41executives, legal, sales and marketing,
- 38:44IT, operations, HR and recruiting,
- 38:47external stakeholders, project teams.
- 38:51Project managers work with executives on
- 38:53a number of different tasks. Executives
- 38:55must work with project managers without
- 38:57their roles overlapping. Project
- 38:59managers work with executives to ensure
- 39:02their roles do not overlap. Align the
- 39:04project to corporate strategy,
- 39:06communicating a goal and vision for the
- 39:08project. Build support for the project
- 39:10and gain assistance evangelizing.
- 39:13Encourage and champion team members.
- 39:16Work to gain budget and resources for
- 39:17the project. Create an environment for
- 39:20the project manager and team to thrive.
- 39:23Project managers also work with legal
- 39:25teams. Interactions with legal teams are
- 39:27especially necessary when there are
- 39:29specific laws, contractual obligations,
- 39:32and legal concerns that the project and
- 39:34its team must pay attention to. Project
- 39:36managers may also work with the legal
- 39:38team when they are involved in contracts
- 39:40for project work. Another department
- 39:43that project managers may work with is
- 39:45sales and marketing. There are
- 39:47interactions with sales and marketing if
- 39:48the project produces a product or
- 39:50service to sell or it changes an
- 39:52existing product or service. Sales and
- 39:55marketing departments will likely be
- 39:56involved. Sales and marketing
- 39:58departments can provide crucial
- 40:00information on sales messaging and
- 40:02customer satisfaction.
- 40:04Project managers will also work with the
- 40:06IT team to manage any systems internal
- 40:09or external required for a project. IT
- 40:12will provide technical support to the
- 40:14team for project success. If the project
- 40:16involves software development, project
- 40:18managers will need to work with
- 40:20developers in IT as part of the project
- 40:22team. In some instances, IT
- 40:24professionals can be leveraged as
- 40:26members of the project team in order to
- 40:28lend technical support. Project managers
- 40:31may also work with the operations
- 40:33department. If the project delivery or
- 40:35outcomes will impact how the
- 40:36organization functions, the project
- 40:38manager will also involve operations to
- 40:40ensure a smooth project transition from
- 40:42development into operations.
- 40:44Another department that project managers
- 40:46may work with is human resources, often
- 40:49referred to as HR and recruiting. Since
- 40:52project managers are responsible for
- 40:53managing labor resources and the team
- 40:55members involved who work on a project,
- 40:57they may need to bring people in from
- 40:58other departments or hire external
- 41:00personnel or contractors. In these
- 41:03cases, HR and recruiting can help
- 41:05project managers get the workers they
- 41:07need.
- 41:09Project managers interact with many
- 41:10people outside the organization.
- 41:13Individuals they frequently meet with
- 41:14include suppliers who provide a service
- 41:17required for the project, clients who
- 41:20request the services or the product
- 41:22being developed for the project,
- 41:24customers who may be contacted if they
- 41:26are involved in the design or testing of
- 41:28the product, consultants who provide
- 41:30expertise on one or more aspects of the
- 41:32project. Finally, the project team is
- 41:36also a group of stakeholders. Project
- 41:38managers work with all team members to
- 41:40gather status, manage issues and risks,
- 41:43drive the timeline and budget, and more
- 41:45to support the project's completion.
- 41:48Project teams actively work with other
- 41:50stakeholders in order to ensure that
- 41:52everyone understands the others
- 41:53interests, needs, and opinions. This
- 41:56maximizes project performance and
- 41:57outcomes, and it increases stakeholder
- 42:00satisfaction.
- 42:02In this video, you learned that project
- 42:04managers work with executives to align
- 42:07projects to corporate strategy, legal to
- 42:10address legal and contract issues, sales
- 42:12and marketing to manage products that
- 42:14are being sold, IT to help with
- 42:17technical systems, operations to ensure
- 42:20smooth transition if the project affects
- 42:22the organization.
- 42:24HR and recruiting to recruit personnel,
- 42:26external stakeholders to work with
- 42:28suppliers, clients, customers, and
- 42:30consultants, project teams to support
- 42:33the project's completion.
- 42:39[Music]
- 42:45Welcome to project management
- 42:46methodologies. After watching this
- 42:49video, you will be able to explain the
- 42:51purpose of the project management body
- 42:53of knowledge PM.
- 42:56List commonly used project management
- 42:58methodologies. Compare and contrast
- 43:00project management methodologies
- 43:02including waterfall, critical path,
- 43:04critical chain, agile, lean, and six
- 43:08sigma. The project management institute
- 43:11known as the PMI is a leader in project
- 43:13management and provides a set of project
- 43:15management guidelines called the project
- 43:17management body of knowledge or PM.
- 43:21The PMO is a set of project management
- 43:24guidelines, best practices and
- 43:26processes. The PMB intends to make
- 43:30project management more effective within
- 43:32cost, scope and time constraints. The
- 43:35PMI provides a certification based on
- 43:37the PMB called the project management
- 43:40professional or PMP certification.
- 43:44The seventh edition or PMBK7
- 43:47was released in 2021.
- 43:50PMBK7 shifted from PMBK6's phase-based
- 43:54project management to principles-based
- 43:56project management. With the
- 43:58principles-based project management
- 44:00focus, the PMBK7 enables the guidelines
- 44:04to be readily applied to different types
- 44:05of projects, say to a manufacturing
- 44:08project instead of a software
- 44:10development project.
- 44:13Details and tools are provided for each
- 44:15principle. The PMBK7 also enables
- 44:18tailoring the project management
- 44:20approach to a suitable adaptation for
- 44:22that project's environment.
- 44:25The PMBB can be applied via a wide
- 44:27variety of project management
- 44:29methodologies. We will discuss several
- 44:32waterfall, critical path, critical
- 44:34chain, agile, lean and six sigma.
- 44:41The waterfall method is one of the
- 44:43oldest project management methodologies.
- 44:45It consists of linear non-over
- 44:47overlapping phases including identifying
- 44:50requirements, analysis, design,
- 44:53building, testing, and operations. It is
- 44:57a rigid structured approach to project
- 44:59management that doesn't provide
- 45:01flexibility for changing requirements.
- 45:04The structured approach to managing the
- 45:06project, gathering product requirements,
- 45:08and gaining approvals helps to minimize
- 45:10cost overruns if the estimation is
- 45:13accurate and requirement changes are
- 45:15minimal. The critical path method of
- 45:17project management is like waterfall but
- 45:20accounts for dependencies. The project
- 45:22manager works with the stakeholders to
- 45:25identify and order requirements using a
- 45:27work breakdown structure. Each task's
- 45:30completion time is estimated like
- 45:33waterfall. The critical path method does
- 45:35not provide room for changing
- 45:37requirements.
- 45:39In this example, you see three paths
- 45:42that can be worked on simultaneously.
- 45:44The critical path is the path that takes
- 45:46the longest amount of time. The critical
- 45:49path is shown here in blue. Since the
- 45:51critical path is the longest, it
- 45:53estimates the length of the project.
- 45:56There are three main parts to the
- 45:58critical chain method. The critical
- 46:00path, the feeding chain, and resource
- 46:03buffers. The feeding chains are
- 46:05concurrent secondary paths to the
- 46:07critical path, also comprised of
- 46:09dependent tasks.
- 46:12The feeding chains eventually merge into
- 46:14a single task within the critical path.
- 46:17Resource buffers are additional
- 46:19resources built into the critical path
- 46:21to provide a measure of leeway in the
- 46:23critical path in case the path does not
- 46:25go as planned.
- 46:28Resource buffers include additional team
- 46:30members, equipment or time to the
- 46:32critical path tasks.
- 46:35Agile was designed to address waterfall
- 46:37shortcomings, namely its inflexibility
- 46:40and changing requirements later in the
- 46:42process. Instead of having long and
- 46:44strict project phases, the project is
- 46:46run in iterations two weeks in length
- 46:49called sprints. Design decisions,
- 46:52implementation decisions, prototypes,
- 46:54and client feedback are processed during
- 46:57the sprint, consistently allowing the
- 46:59stakeholders to provide regular feedback
- 47:02and consequently iterating on the
- 47:04project's development. Agile is often
- 47:06paired with other more robust project
- 47:08management strategies such as conbon,
- 47:11scrum or extreme programming.
- 47:15Four core values govern agile
- 47:17methodology. These values are
- 47:20individuals and interactions over
- 47:22process and tools. Working software over
- 47:25comprehensive documentation.
- 47:27Customer collaboration over contract
- 47:30negotiation.
- 47:31Responding to change over following a
- 47:33plan.
- 47:35It also has 12 guiding principles
- 47:37developed to produce self-governed,
- 47:39highly collaborative and adaptable
- 47:41teams.
- 47:43The lean project management methodology
- 47:45focuses on delivering value and
- 47:47minimizing the waste of resources or
- 47:49time. One of the key principles of lean
- 47:52is flow. Flow is about moving the
- 47:54product through stages quickly,
- 47:56continuously, and efficiently, making
- 47:58room for the next. Work is done in a
- 48:01steady flow rather than in batches.
- 48:04While agile has bi-weekly sprints, lean
- 48:07is a continuous pipeline. Agile is well
- 48:10suited for development processes such as
- 48:12software. Whereas lean is better applied
- 48:14to production.
- 48:16The six sigma method is a collection of
- 48:18tools and techniques to improve
- 48:20processes.
- 48:22This method originated in manufacturing
- 48:24and is datadriven.
- 48:26The term six sigma comes from statistics
- 48:29referring to the number of defective
- 48:31products that are equal to or less than
- 48:34six standard deviations from the mean in
- 48:36a normal distribution. The six sigma
- 48:38methodology is often credited with
- 48:41revolutionizing quality management by
- 48:43innovating it into its profession versus
- 48:46something handled by the production
- 48:47team. To apply the six sigma method,
- 48:50accurate data is needed. One of the main
- 48:52criticisms of this method is the over
- 48:54reliance on this type of documentation.
- 48:58In this video, you learned that the PNB
- 49:02is a set of project management best
- 49:03practices, guidelines, and processes
- 49:06intended to make project management more
- 49:08effective. Waterfall, critical path, and
- 49:12critical chain methodologies use a
- 49:14linear structured approach where tasks
- 49:16take place in either mutually exclusive
- 49:18phases or sequences. Agile focuses on
- 49:21development and development is run
- 49:23iteratively where iterations
- 49:25consistently improve on the previous
- 49:27one. Lean is focused on continual
- 49:30production flow while delivering value
- 49:32and minimizing waste. Six sigma is data
- 49:35focused and manufacturing driven.
- 49:43[Music]
- 49:49Welcome to expert viewpoints project
- 49:51management methodologies.
- 49:53In this video we will hear from project
- 49:56managers discussing the project
- 49:57management methodologies they have used
- 49:59as project managers such as agile
- 50:02waterfall or something else.
- 50:04>> At my company we do a lot of technical
- 50:06implementations directly with frontline
- 50:08customers whether it's from finance,
- 50:12health, tech, whatever it might be. We
- 50:14have so many different types of
- 50:15companies. Typically at my company, we
- 50:17do like to go ahead and use hybrid or
- 50:21agile methodologies. They just are best
- 50:24fit for our company. However, we do see
- 50:26many different types of customers that
- 50:28have preferences, whether it's agile,
- 50:31waterfall, hybrid, scrum, and we go
- 50:34ahead and just customize towards them.
- 50:36>> As a project manager, I've used a
- 50:38variety of methodologies. Uh the two
- 50:40biggest ones being both agile and
- 50:42waterfall. So I cut my teeth early
- 50:45stages of uh the computer revolution uh
- 50:49as a waterfall project manager using
- 50:52Microsoft project. But even then in the
- 50:55early days well before agile was a
- 50:58formulated uh methodology uh we were
- 51:01often using agile techniques uh
- 51:04everything from having standups daily um
- 51:08generally in the morning uh but
- 51:09depending on where the team was it could
- 51:11be spread around uh all the way to how
- 51:14we were formulating our ability to do
- 51:16rapid prototyping. So uh and then within
- 51:20that you know the beauty of really
- 51:22learning all the different things that
- 51:24can uh be used to properly manage a
- 51:28project is creatively putting those
- 51:31together depending on the project.
- 51:34>> The most common methodology that I have
- 51:36used in my career has been a hybrid
- 51:38model. A hybrid approach where you do
- 51:42most of your work uh day-to-day work in
- 51:45an agile fashion. you have all of the
- 51:47agile ceremonies like daily standups and
- 51:50retrospectives
- 51:52but a lot of the work is also uh kind of
- 51:55managed at a higher level in a waterfall
- 51:58approach. So a lot of the the work that
- 52:01I have done has been in a kind of a
- 52:04hybrid agile waterfall approach.
- 52:07>> In my experience I've had the
- 52:09opportunity to manage and be part of a
- 52:13variety of different projects. I've been
- 52:16part of typical waterfall projects where
- 52:19we plan, we do, we check and we act.
- 52:21I've been part of agile projects as well
- 52:24where we plan, do, check, and learn. The
- 52:27one piece of advice that I'd like to go
- 52:29ahead and share with you in terms of
- 52:32choosing a methodology was developed by
- 52:34a gentleman named Ralph Stacy. Whenever
- 52:37you are encountered with the challenge
- 52:40of managing a new project, look at two
- 52:42aspects of the project. Aspect number
- 52:44one, how much agreement is there among
- 52:47stakeholders in terms of the
- 52:49deliverables that are going to be
- 52:50required?
- 52:52Consideration number two, how complex is
- 52:55technology and how much innovation and
- 52:58creativity is going to be required? If
- 53:01the agreement on what success looks like
- 53:03is low and the complexity is very very
- 53:06high then I recommend that you lean
- 53:09toward an agile methodology to complete
- 53:12the project. If the agreement among
- 53:15stakeholders on deliverables is very
- 53:18very high and the complexity is
- 53:20relatively low then in all likelihood a
- 53:23predictive or waterfall project will be
- 53:25most appropriate for you to be
- 53:27successful on the project.
- 53:29The methodologies that I have used in my
- 53:32own projects have been both waterfall
- 53:34and agile timelines. And when I first
- 53:39started in overseeing projects, it was
- 53:41very waterfall based because the volume
- 53:44of projects was not as big as it was
- 53:47later on in my career. So the waterfall
- 53:50method was really good for having a
- 53:52smaller amount of projects where we
- 53:55could manage these waterfall waterfall
- 53:57style um milestone calendars for
- 54:00different stakeholders. Agile really
- 54:03came into play when there were a lot
- 54:06more projects that were launching all at
- 54:09once. My experience has been online
- 54:12learning. So to put that into
- 54:13perspective, I could have been at one
- 54:16point launching maybe two or three
- 54:18quarters, two or three courses a quarter
- 54:21where later on in my career, it was clo
- 54:23a lot closer to um 10 courses per
- 54:27quarter. So that meant having to be a
- 54:30lot more agile in the calendars and
- 54:33being able to actually be identify
- 54:36points of flexibility and also open up
- 54:40better communication channels to launch
- 54:42the courses on time.
- 54:47[Music]
- 54:54Welcome to traditional versus modern
- 54:56project management.
- 54:57After watching this video, you will be
- 55:00able to describe features of traditional
- 55:02project management and modern project
- 55:04management. Compare and contrast
- 55:06advantages of modern and traditional
- 55:08project management. Traditional project
- 55:11management is based on predictable
- 55:13cycles, processes, and tools. This is in
- 55:16part what has made it so successful for
- 55:18so long. Rather than working in short
- 55:21cycles on automatic pieces of work,
- 55:23traditional project management work
- 55:25plans the work linearly from start to
- 55:28finish that is executed sequentially
- 55:30with a focus on upfront planning,
- 55:32documentation, and the project
- 55:34management life cycle. Changes are only
- 55:37made when necessary. But there have been
- 55:39several shifts in project management
- 55:41towards a more modern method. Modern
- 55:44project management is the type of
- 55:45project management that you have been
- 55:47learning in this series.
- 55:49Instead of large, inflexible projects,
- 55:52modern project management breaks large
- 55:54objectives into smaller, more manageable
- 55:56pieces with clear end goals. Modern
- 55:59project management often incorporates an
- 56:02agile or hybrid project management
- 56:04methodology, allowing teams to be more
- 56:06flexible in their scope, processes, and
- 56:09tools.
- 56:11As organizations have evolved to be more
- 56:13fast-paced and global, modern projects
- 56:16have required an evolution of project
- 56:18management. Traditional project
- 56:20management involved static fixed
- 56:22projects where timelines, budgets,
- 56:24deliverables, and resources changed
- 56:27infrequently. Requirements were set at
- 56:29the beginning of the project and changed
- 56:31little. In contrast, modern project
- 56:34management involves projects that
- 56:36fluctuate. They require fluidity and
- 56:39must be managed such that they are agile
- 56:41and flexible. Development happens
- 56:43iteratively. They are often large and
- 56:45involve multiple teams working together.
- 56:48Due to trends in globalization and
- 56:50remote work and the development of
- 56:52project management and collaboration
- 56:53software, modern projects can also now
- 56:56be managed virtually.
- 56:58The evolution to modern project
- 57:00management has several advantages,
- 57:02including increased flexibility that
- 57:05allows organizations to respond to
- 57:07changing business objectives,
- 57:08competitive pressures, or global events,
- 57:11faster time to market, identifying and
- 57:14fixing issues more quickly, increases in
- 57:16productivity and retention, capital and
- 57:19operational cost savings from a remote
- 57:21workforce. There are also a few
- 57:23disadvantages of modern project
- 57:25management.
- 57:26Teams can lose sight of the overall
- 57:28vision and objectives for a project. So
- 57:31the project can seem to have no end.
- 57:34Project deliverables can go to market
- 57:36unfinished with the view that the team
- 57:38will complete it later. Since teams
- 57:41focus on delivering project
- 57:42deliverables, necessary documentation
- 57:44can be forgotten or incomplete.
- 57:47Team members can feel as though they
- 57:49aren't connected to the organization or
- 57:51that they aren't supported. There have
- 57:53also been shifts in how organizations
- 57:55are structured and operate that have had
- 57:58an impact on modern project management.
- 58:00Organizations have become far more
- 58:02global with the rise of modern
- 58:03technology. Many organizations have
- 58:06teams that work across time zones and
- 58:08countries. This means that organizations
- 58:10have diverse cultures and have a more
- 58:13flexible work environment. Globalization
- 58:15and an increase in remote work also
- 58:18means that more work is done virtually
- 58:20and globally. Project management and
- 58:22collaboration tools have also supported
- 58:24this shift. While many organizations
- 58:27have evolved their project management
- 58:29styles, modern project management has
- 58:31both advantages and disadvantages.
- 58:34Agile project management methods allow
- 58:36organizations to manage projects with
- 58:38more flexibility. That increased
- 58:40flexibility allows organizations to
- 58:42change their project deliverables or
- 58:44outcomes based on any number of factors.
- 58:47This means that organizations can more
- 58:49easily adapt in an everanging world. But
- 58:52this flexibility can also become a
- 58:54disadvantage when an organization does
- 58:56not have a clear vision at the beginning
- 58:58of the project or it changes its project
- 59:01objectivity many times. Teams can lose
- 59:04sight of what they are working on and it
- 59:07may feel like there is no definite end
- 59:08to the project. Modern project
- 59:10management methods also focus on
- 59:12increasing an organization's time to
- 59:14market. While this is a benefit as
- 59:17organizations can start realizing value
- 59:19from their projects more quickly,
- 59:21occasionally project deliverables can go
- 59:23to market unfinished as teams believe
- 59:26they can just complete it in the next
- 59:27cycle. Another benefit is that teams can
- 59:30identify and fix issues with project
- 59:32deliverables more quickly. But since
- 59:35teams are focused on delivering project
- 59:37deliverables quickly and fixing issues,
- 59:39there's often a lack of focus on
- 59:41documentation and reducing technical
- 59:44debt.
- 59:45Finally, the rise of automated tools and
- 59:48software has also provided modern
- 59:50project teams several advantages.
- 59:53New collaboration tools allow teams to
- 59:55collaborate more effectively as well as
- 59:58virtually. Additionally, new tools can
- 1:00:01automate the time-consuming manual
- 1:00:03processes in traditional project
- 1:00:05management such as spreadsheet
- 1:00:06calculations, report building,
- 1:00:09monitoring, and exporting data. These
- 1:00:12tools give project managers more control
- 1:00:14and flexibility, allowing them to spend
- 1:00:16more time optimizing the project rather
- 1:00:19than spending time performing tasks that
- 1:00:20can be automated. Finally,
- 1:00:23globalization, remote work, and the rise
- 1:00:26of project management tools and software
- 1:00:28allows teams to work virtually from all
- 1:00:30over the globe. This gives organizations
- 1:00:33increases in productivity and employee
- 1:00:35retention. It can also create capital
- 1:00:38and operational cost savings by having a
- 1:00:41remote workforce.
- 1:00:43But in a virtual and remote work model,
- 1:00:46team members can feel as though they
- 1:00:47aren't supported or connected to the
- 1:00:49organization.
- 1:00:51In this video, you learned that
- 1:00:54traditional project management is
- 1:00:56predictable, continuous, and sequential,
- 1:00:58and it requires planning beforehand.
- 1:01:01This stability is an advantage of
- 1:01:03traditional project management.
- 1:01:06Modern project management is flexible,
- 1:01:08used for unique projects, and can be
- 1:01:10started without planning a project all
- 1:01:12the way to the end.
- 1:01:14Some of the advantages of modern project
- 1:01:16management include being able to respond
- 1:01:18to changes and client feedback, having
- 1:01:20more flexibility in how work is
- 1:01:22accomplished, and using tools to
- 1:01:24automate management processes.
- 1:01:31[Music]
- 1:01:37Welcome to recent trends in project
- 1:01:39management. After watching this video,
- 1:01:42you will be able to list current trends
- 1:01:44in project management. Summarize how
- 1:01:47current trends impact the project
- 1:01:49management role. Current trends in
- 1:01:51project management include an emphasis
- 1:01:53on the use of artificial intelligence or
- 1:01:57AI, project management software, data
- 1:02:00analytics, remote teams and a global
- 1:02:03workforce, hybrid project management
- 1:02:06methodologies, and soft skills.
- 1:02:10Recently, more and more organizations
- 1:02:12have been adopting the use of artificial
- 1:02:14intelligence called AI across their
- 1:02:17businesses. The use of AI benefits
- 1:02:20organizations and project managers in
- 1:02:23multiple ways. AI can provide insights
- 1:02:26to product managers and stakeholders by
- 1:02:29quickly analyzing previous project
- 1:02:31performance data. With this data, as
- 1:02:34well as data from other sources, AI can
- 1:02:36also be used to estimate resource and
- 1:02:38budget usage and predict risks and
- 1:02:40issues, helping organizations plan
- 1:02:43projects with a higher degree of
- 1:02:44confidence and make quicker decisions
- 1:02:46while mitigating risks more accurately.
- 1:02:49Additionally, in the near future, AI is
- 1:02:52expected to be able to automate many
- 1:02:54minor administrative tasks that project
- 1:02:57managers currently do, allowing them to
- 1:02:59focus more on higher level strategic
- 1:03:02activities and planning. AI could assist
- 1:03:04project managers by automatically
- 1:03:07allocating resources and updating the
- 1:03:09project schedule and budget based on
- 1:03:11data. Thanks to the introduction of AI
- 1:03:14and cloud technologies, project
- 1:03:16management software has also been
- 1:03:18upgraded. Project management tools such
- 1:03:20as ASA, Reich, and Trello are now
- 1:03:23cloud-based and utilize AI features to
- 1:03:26facilitate efficient project management
- 1:03:27operations.
- 1:03:29A major benefit of project management
- 1:03:31software is that it allows all
- 1:03:33stakeholders to easily track project
- 1:03:35status at any given time.
- 1:03:38Project management tools can help
- 1:03:40project managers automatically track
- 1:03:42costs and time spent working on tasks
- 1:03:45and use that information to develop cost
- 1:03:47and resource projections. These
- 1:03:49projections can help project managers
- 1:03:51see potential risks and issues earlier
- 1:03:53in the project and make course
- 1:03:55corrections based on the data.
- 1:03:57Additionally, project management
- 1:03:59software is often used across all an
- 1:04:01organization's projects and programs.
- 1:04:04This allows organizations to monitor
- 1:04:06their projects to have a better
- 1:04:07understanding of how their projects and
- 1:04:09programs are working together and helps
- 1:04:11executives make quick strategic
- 1:04:13decisions on staffing, cost-saving
- 1:04:15measures, technology decisions, and
- 1:04:17more. Project management software and
- 1:04:20the adoption of AI have given project
- 1:04:22managers and project stakeholders access
- 1:04:24to more data than ever before. As
- 1:04:27discussed, that data is used to help
- 1:04:29everyone from project managers up to the
- 1:04:32seauite make decisions.
- 1:04:34Project managers can use data to
- 1:04:36estimate scope, measure project
- 1:04:38progress, and assess risk. But an
- 1:04:41abundance of data has also required the
- 1:04:44adoption of data visualization tools.
- 1:04:46Tools like IBM Cognos, Looker Studio or
- 1:04:50Tableau can take project and resource
- 1:04:52data and combine it with other data from
- 1:04:54the organization to develop a complete
- 1:04:57picture of key performance indicators
- 1:04:59and project health. Another trend in
- 1:05:02project management is the rise of
- 1:05:03virtual teams. Because of developments
- 1:05:06in technology, changing corporate
- 1:05:08values, and the growth of the gig
- 1:05:10economy, virtual teams have become more
- 1:05:13common. The onset of the CO 19 pandemic
- 1:05:16in early 2020 also increased the
- 1:05:18adoption of work from home policies that
- 1:05:21allowed some team members to complete
- 1:05:23work from nearly anywhere.
- 1:05:25Collaboration tools such as Slack, Zoom,
- 1:05:28and Microsoft Teams along with project
- 1:05:31management software such as Jira helps
- 1:05:33teams to work together even when they
- 1:05:35are working across different time zones.
- 1:05:38These tools are particularly helpful for
- 1:05:40project managers who manage numerous
- 1:05:42resources across different locations.
- 1:05:45Hybrid project management methodologies
- 1:05:48are another trend that has been
- 1:05:49increasing in recent years. Hybrid
- 1:05:52project management methodologies
- 1:05:53incorporate different project management
- 1:05:55methodologies such as agile, scrum, XP,
- 1:05:59scaled agile framework, SAFE, waterfall
- 1:06:03and lean. Organizations are increasingly
- 1:06:06turning to hybrid methodologies to
- 1:06:08address the need for flexibility. This
- 1:06:11allows organizations to find a unique
- 1:06:13approach that works best in a particular
- 1:06:15situation, project or industry. This
- 1:06:19means that project managers must be
- 1:06:21familiar with many project management
- 1:06:23methodologies, but also gives them a
- 1:06:25broader toolbox with which to manage
- 1:06:27projects.
- 1:06:29Finally, with the development and
- 1:06:31adoption of numerous AI tools and
- 1:06:33project management software, as well as
- 1:06:35the rise in remote or hybrid remote
- 1:06:37teams, the project management profession
- 1:06:40has seen an increase in the need for
- 1:06:42project managers with strong soft
- 1:06:44skills.
- 1:06:46Skills such as emotional intelligence,
- 1:06:48conflict resolution, communication,
- 1:06:50negotiation, and mentoring are in high
- 1:06:53demand. As new technologies like AI and
- 1:06:56project management software handle more
- 1:06:58administrative work, project managers
- 1:07:00are now focusing on other
- 1:07:02responsibilities that require some of
- 1:07:04these key soft skills. By developing
- 1:07:07these skills, project managers are able
- 1:07:09to better contribute to a project
- 1:07:11success.
- 1:07:13In this video, you learned that new
- 1:07:15trends in project management include the
- 1:07:17use of artificial intelligence, which
- 1:07:20can automate administrative tasks.
- 1:07:22Project management software, which can
- 1:07:25help project managers monitor a
- 1:07:27project's resources and schedule in real
- 1:07:29time. Data analytics, which can help
- 1:07:32organizations make datadriven decisions
- 1:07:34about their projects. remote teams and a
- 1:07:37global workforce which allows teams to
- 1:07:39work across locations and time zones.
- 1:07:42Hybrid project management methodologies
- 1:07:45which apply multiple project management
- 1:07:47methodologies to the projects they are
- 1:07:49best suited. Soft skills like
- 1:07:52communications which are increasingly
- 1:07:54valuable as emerging technologies do
- 1:07:56administrative work.
- 1:08:02[Music]
- 1:08:07Welcome to expert viewpoints, trends in
- 1:08:10project management. In this video, we
- 1:08:13will hear from project managers
- 1:08:15discussing the evolution of project
- 1:08:17management and what they like or dislike
- 1:08:19about recent trends.
- 1:08:21>> I'm going to go ahead and share two
- 1:08:23terms with you. Number one, virtual.
- 1:08:26Number two, technology.
- 1:08:28Virtual has become a key consideration
- 1:08:31in project management. We as project
- 1:08:34managers no longer have the luxury of
- 1:08:37having an in place team colllocated
- 1:08:40where we can meet and greet each day. So
- 1:08:43a project manager needs to be
- 1:08:44well-versed in how to handle a virtual
- 1:08:48project and the tools and techniques
- 1:08:50that are available to him or her. The
- 1:08:53second is technology. In the past,
- 1:08:56project management was very easy. Make
- 1:08:59sure that you have a pad of paper and a
- 1:09:01pen and write good notes and send
- 1:09:03emails. Now, we have a variety of
- 1:09:06different platforms. We have Jira, we
- 1:09:09have Teams, we have a sauna, we have
- 1:09:11Box, you name it. There's different
- 1:09:14technology that is out there that can
- 1:09:16greatly assist us in managing our
- 1:09:19projects. But the key challenge is
- 1:09:21learning them. From my last company
- 1:09:24where I was in office over to where I'm
- 1:09:27currently at which is fully remote,
- 1:09:28things have changed majorly in project
- 1:09:30management. Previously, everything had
- 1:09:34to be in person meetings. We thought
- 1:09:36that it would be much better for a
- 1:09:38business relationship, which is great to
- 1:09:41meet people in person, of course, and
- 1:09:42have that face to face. You could see
- 1:09:44their emotions, their body language.
- 1:09:46However, in the new space of remote, you
- 1:09:50can reach out to anybody at any time and
- 1:09:53have a quick response just through a
- 1:09:54quick chat.
- 1:09:56>> Uh, a big thing that's changed just
- 1:09:59recently for most of the world is
- 1:10:01working with remote teams. Now, that's,
- 1:10:03you know, caused a lot of, uh,
- 1:10:06challenges for project management. uh
- 1:10:08from as simple as dealing with the time
- 1:10:10differences of working with offshore
- 1:10:13teams or teams in u other places also
- 1:10:16you know you have to deal with
- 1:10:18differences in culture uh attitudes you
- 1:10:21know it's it becomes a little bit more
- 1:10:23complicated you know motivating your
- 1:10:26team working with them uh putting
- 1:10:28together a way so that the workflow is
- 1:10:32going smoothly
- 1:10:34>> the proliferation of the cloud and cloud
- 1:10:37cloud-based tools like Jira, um
- 1:10:40cloud-based tools like Trello and ASA
- 1:10:43that have really allowed us to digitize
- 1:10:46things like user stories and then using
- 1:10:50data and now artificial intelligence to
- 1:10:56really help us understand things like
- 1:10:58what is our burndown rate? um how many
- 1:11:02people do we need on a project at any
- 1:11:04given time and what is our resourc
- 1:11:08resourcing look like for the next 3 to 6
- 1:11:10months for this project. Uh there's a
- 1:11:14lot more tools out there that use data
- 1:11:17artificial intelligence that use the
- 1:11:19cloud for even basic communication.
- 1:11:22>> The ways of project management have
- 1:11:24evolved over time quite tremendously. I
- 1:11:28when I first started I feel like I know
- 1:11:31agile has been around for a while but
- 1:11:33when I started definitely we were a lot
- 1:11:35more focused on waterfall methods and
- 1:11:38agile really didn't come into play later
- 1:11:40and especially as our teams became more
- 1:11:43dispersed. It became really important to
- 1:11:46be honed in on one method of project
- 1:11:50managing. So if we were managing a few
- 1:11:53projects that were going to launch per
- 1:11:55quarter but it it changed to managing
- 1:11:58twice double or triple or that we had to
- 1:12:00update our methods to be more agile but
- 1:12:03we also had to identify which ways agile
- 1:12:06was going to work for us. So that meant
- 1:12:08not just having once a week project
- 1:12:10meetings for updates. It meant having
- 1:12:13daily standups which were really helpful
- 1:12:15when our team members were dispersed. So
- 1:12:17I had team members in New York, I had
- 1:12:19some in Chicago, I had some
- 1:12:21international members. So we had to
- 1:12:24identify key points for us to be able to
- 1:12:26meet and be able to communicate about
- 1:12:29the the projects at stake.
- 1:12:32>> What do you like or dislike about new
- 1:12:34ways of project management?
- 1:12:36>> I truly love the opportunity of being
- 1:12:38able to work with everyone virtually. I
- 1:12:41can easily talk to people that are in
- 1:12:43crossf functional teams like my sales
- 1:12:45team over to marketing or product
- 1:12:47management and having those true live
- 1:12:50updates within a matter of seconds. Some
- 1:12:53of the dislikes, it's definitely much
- 1:12:55harder to build those relationships
- 1:12:57because it's quick answers. You don't
- 1:12:59get to see everyone. Plus, sometimes,
- 1:13:01especially when you're meeting with your
- 1:13:03stakeholders, you want to know what
- 1:13:04they're thinking. And when you see them
- 1:13:06in person, at least you can see their
- 1:13:08body language and their overall tone.
- 1:13:11You can get some of that over a call,
- 1:13:13especially like a team's meeting, for
- 1:13:15example, or WebEx. However, you don't
- 1:13:18see it all, especially if we don't use
- 1:13:19cameras. There's a lot of data out there
- 1:13:23and as we move as project managers move
- 1:13:26information and and manage their
- 1:13:28projects using these tools, it's very
- 1:13:31easy to get bogged down in all of the
- 1:13:34data and all of the reports that are
- 1:13:36available and all of the information
- 1:13:39that's out there and really to not only
- 1:13:44overwhelm themselves but overwhelm their
- 1:13:46teams, their stakeholders with,
- 1:13:51you know, just massive processes or lots
- 1:13:54of information that they don't need to
- 1:13:57get a project done.
- 1:13:59What I like about new ways for project
- 1:14:02management that is that there are so
- 1:14:04many more options to be able to manage
- 1:14:06projects and that means using different
- 1:14:09software to be able to figure out what's
- 1:14:12best for your project. I've worked in
- 1:14:14Smart Sheets before and I've also worked
- 1:14:17in a sauna and there are plenty of other
- 1:14:22software plenty of other software um
- 1:14:25available out there for project
- 1:14:26management. So, I really like that you
- 1:14:28can find the specific one that caters to
- 1:14:30your particular project. And what I
- 1:14:33dislike about new
- 1:14:36uh project management methodologies is
- 1:14:39that there are so many options. And I
- 1:14:43think that you can get really sucked
- 1:14:45into figuring out into trying to figure
- 1:14:47out the different software to see where
- 1:14:49it lines up for your project. And I
- 1:14:52think that can start to distract from
- 1:14:54actually getting in there and doing. So,
- 1:14:56it's a love and love and hate
- 1:14:58relationship with some of the new parts
- 1:15:00of project management that are evolving.
- 1:15:04>> Well, something that I like is the
- 1:15:06technology, but something that I dislike
- 1:15:08is the learning curve that's required to
- 1:15:10adapt and understand the new technology.
- 1:15:14And in addition, I do enjoy the
- 1:15:16opportunity to manage projects in a
- 1:15:18virtual environment, but I also
- 1:15:21understand the challenges that come
- 1:15:23along with a virtual project and the
- 1:15:26need to really communicate well in that
- 1:15:29particular environment.
- 1:15:31[Music]
- 1:15:42Welcome to expert viewpoints traits of a
- 1:15:44project manager. In this video, we will
- 1:15:47hear from project managers discussing
- 1:15:49the most important traits for project
- 1:15:51managers to have and what kind of people
- 1:15:53are a good fit for the project manager
- 1:15:55role.
- 1:15:57I highly suggest somebody that is very
- 1:15:59detail oriented. You're going to have a
- 1:16:01very professional standpoint in the
- 1:16:04overall project. Again, you're leading
- 1:16:06and responsible for the overall project
- 1:16:08and may be working with a lot of seuite
- 1:16:10individuals for your stakeholders. Along
- 1:16:13with that, organization is the biggest
- 1:16:15thing that you'll need. Highly suggest
- 1:16:17that you are very organized and if you
- 1:16:20don't know, go try to find out ways to
- 1:16:22be organized
- 1:16:24along with that time management. You
- 1:16:26will need that for the overall success
- 1:16:28of the project, including the schedule.
- 1:16:32Even the budget can be impacted and the
- 1:16:35scope of course
- 1:16:37>> for me at the very top of the list is
- 1:16:40diplomacy. A project manager is if
- 1:16:44they're good is a consumate diplomat.
- 1:16:48You're have to have the ability to work
- 1:16:52with teams in a way that motivates them,
- 1:16:56keeps them happy. You know, I like my
- 1:16:59teams to have fun.
- 1:17:02I think a good trait of a project
- 1:17:04manager to have is empathy. I think as a
- 1:17:07project manager, you're working with
- 1:17:10typically multiple stakeholders
- 1:17:12from executive sponsors to uh other
- 1:17:17functions like marketing, HR, finance,
- 1:17:21um really so many different people as
- 1:17:24well as your team. And each of those
- 1:17:27people is a unique individual with
- 1:17:30unique skill sets. And if you're a
- 1:17:33project manager, you need to have
- 1:17:35empathy and be able to understand the
- 1:17:39different motivations of each of your
- 1:17:41stakeholders
- 1:17:43and really connect with those people on
- 1:17:45a level that they can appreciate and
- 1:17:51that um allows them to work well with
- 1:17:54you.
- 1:17:56The most important traits for project
- 1:17:59managers to have are communication
- 1:18:02and people skills. Communication because
- 1:18:06of the fact that project managers work
- 1:18:08across several different stakeholders in
- 1:18:10different departments. So, it's really
- 1:18:13important to stay on top of each of
- 1:18:16those stakeholders and their milestones
- 1:18:18and be able to know when is the right
- 1:18:20time to communicate with them and how to
- 1:18:22do so. and at the same time be able to
- 1:18:25have the people skills and the
- 1:18:26relationship skills to remember that
- 1:18:30while we are working on a project that
- 1:18:32ultimately every person involved is a
- 1:18:36person and because of that they're going
- 1:18:38to have different things that are
- 1:18:39affecting their work. So while staying
- 1:18:42on top of everything is really
- 1:18:43important, it's also really important to
- 1:18:45value the people around you and be able
- 1:18:48to be a part of the culture that that
- 1:18:51keeps a positive work environment for
- 1:18:53everyone involved. And that ultimately
- 1:18:55has led to in my experience and I think
- 1:18:58most people's experience is successful
- 1:19:01launches of projects.
- 1:19:04>> I'm going to respond with three traits.
- 1:19:06Number one, ensure that you are a good
- 1:19:10organizer. Number two, ensure that you
- 1:19:12are proactive. And number three, ensure
- 1:19:16that you are a good communicator. In
- 1:19:18terms of organization, understand the
- 1:19:21appropriate project life cycle that will
- 1:19:23support the project best and implement
- 1:19:26it. In terms of being proactive, issues
- 1:19:29and changes in a project are going to
- 1:19:31occur. In many cases, as a project
- 1:19:33manager, those issues and changes will
- 1:19:36not come to you. You could very well be
- 1:19:38the last to know. So, you need to
- 1:19:40proactively go out and find them before
- 1:19:42they do find you. And third,
- 1:19:45communication. It is said by the project
- 1:19:47management institute that effective
- 1:19:49communications is 90% of a project
- 1:19:52manager's job. I am a firm believer in
- 1:19:54that percentage and could probably argue
- 1:19:56the point that it's in all likelihood
- 1:19:59closer to 100.
- 1:20:02What kind of people are a good fit for a
- 1:20:04project manager role?
- 1:20:08>> The kind of people that are a good fit
- 1:20:10for project manager roles are people
- 1:20:13that are able to balance several
- 1:20:16different things at once because while I
- 1:20:19mentioned communication and people
- 1:20:20skills are really important, so is
- 1:20:22balance because you're continuously
- 1:20:24juggling different pieces of a puzzle.
- 1:20:26So people who are able to do that are
- 1:20:28the best fit.
- 1:20:31I've met a a wide variety of project
- 1:20:34managers, but the best people have
- 1:20:36always been people people. They're
- 1:20:39they're people who enjoy working with
- 1:20:41their teams. They're personable. Uh they
- 1:20:45are easy to like. They they really care
- 1:20:49both for the work and the people around
- 1:20:51them. And and to me, that's the most
- 1:20:54most important thing. you know, all the
- 1:20:57other skills can be learned. Uh, but if
- 1:20:59you don't have that that caring
- 1:21:02attitude, it's very hard to to to keep a
- 1:21:06team happy and working well.
- 1:21:09I think that um anyone that is fairly
- 1:21:14organized, that's detail oriented, that
- 1:21:18can break down kind of a complex
- 1:21:21situation into bite-sized pieces and
- 1:21:25then string those pieces together so
- 1:21:27that they make sense. Uh could be a good
- 1:21:30project manager. I think people that
- 1:21:33have strong people skills can be project
- 1:21:35managers. I think people who are good at
- 1:21:40admin tasks can be good project
- 1:21:43managers. Um I think that there's lots
- 1:21:46of people that could be a good fit for
- 1:21:48project management.
- 1:21:51>> Simple answer, enjoy two things. Number
- 1:21:54one, be organized and enjoy process.
- 1:21:56There's a distinct project process that
- 1:21:59is required to effectively manage a
- 1:22:01project. Secondly, ensure that you enjoy
- 1:22:05interfacing with people. A good project
- 1:22:08manager is a good communicator and
- 1:22:10builds relationships with all
- 1:22:12stakeholders and the team.
- 1:22:15[Music]
- 1:22:25Welcome to soft skills for project
- 1:22:28management. After watching this video,
- 1:22:30you will be able to explain the term
- 1:22:33soft skills, describe the soft skills
- 1:22:36required for effective project
- 1:22:37management.
- 1:22:39While other parts of this course focus
- 1:22:41on the technical skills required for
- 1:22:42project management, for instance,
- 1:22:45proficiency and spreadsheet software,
- 1:22:47this video emphasizes the importance of
- 1:22:49soft skills. Soft skills include
- 1:22:51intangible skills such as personality
- 1:22:54traits, interpersonal skills, and
- 1:22:56attitudes cultivated from your life
- 1:22:58experiences. They are not as readily
- 1:23:00quantifiable, taught, and learned as
- 1:23:02technical skills. The soft skills that
- 1:23:05are helpful for project managers will be
- 1:23:07discussed in this video.
- 1:23:09This video organizes soft skills into
- 1:23:12four categories: proficiencies,
- 1:23:14competencies, traits, mindsets. We will
- 1:23:18discuss examples from each category that
- 1:23:21are helpful for a project manager
- 1:23:22success.
- 1:23:24Proficiencies describe expertise in a
- 1:23:27particular area and the ability to
- 1:23:29utilize this knowledge effectively.
- 1:23:31There are a number of these
- 1:23:32proficiencies required to be a
- 1:23:34successful project manager. This
- 1:23:36includes skills in research, analysis,
- 1:23:38negotiation, and report writing.
- 1:23:41Research enables project managers to
- 1:23:43find accurate information within or
- 1:23:45outside of the organization quickly.
- 1:23:47Analysis allows project managers to take
- 1:23:50the information they've gathered,
- 1:23:51evaluate and interpret it, then make
- 1:23:54decisions based on that information.
- 1:23:57Negotiation skills provide the ability
- 1:23:59to get two or more parties with
- 1:24:00different points of view to come to an
- 1:24:02agreement. Project managers should be
- 1:24:05proficient in report writing to create
- 1:24:07effective reports tailored to a specific
- 1:24:09audience which are well organized and
- 1:24:11accessible.
- 1:24:13Competencies are area of expertise for
- 1:24:15which you have sufficient knowledge to
- 1:24:17perform. For project managers, relevant
- 1:24:20competencies include written and oral
- 1:24:22communication, time management, public
- 1:24:24speaking, decision-m, and relationship
- 1:24:27building. Though most modern
- 1:24:29professional jobs require communication
- 1:24:31skills, project managers in particular
- 1:24:33must be effective written and verbal
- 1:24:35communicators as they are responsible
- 1:24:37for communicating with, between, and to
- 1:24:40different stakeholders.
- 1:24:42Effective time management is necessary
- 1:24:44for project managers. They are
- 1:24:46responsible for planning projects and
- 1:24:47time management is a crucial part of
- 1:24:49that. They should be able to accurately
- 1:24:51estimate how long a task will take,
- 1:24:54effectively stay on the task themselves
- 1:24:56and help their team manage their time.
- 1:24:58Project managers must be comfortable
- 1:25:00speaking publicly to direct meetings and
- 1:25:03deliver presentations using their
- 1:25:05research and analysis skills. Project
- 1:25:07managers should be able to make
- 1:25:08decisions based on relevant information
- 1:25:10by identifying and assessing
- 1:25:12alternatives. Project managers are
- 1:25:14responsible for building relationships
- 1:25:16among stakeholders. These strong
- 1:25:18relationships are based on trust,
- 1:25:20communication, respect, and inclusion.
- 1:25:24Traits are aspects of your personality.
- 1:25:26Traits can be developed and improved
- 1:25:28with attention and practice. Some traits
- 1:25:31necessary for project managers are being
- 1:25:33self-motivated, creative, detail
- 1:25:36oriented, and able to task switch. If
- 1:25:39project managers are motivated, they can
- 1:25:41better persuade and motivate others
- 1:25:43effectively. They can guide themselves
- 1:25:45and their team members through the ups
- 1:25:46and downs of project development and
- 1:25:48stay motivated to stay on task with
- 1:25:50their work. Project managers may find
- 1:25:53themselves in situations where they must
- 1:25:55devise creative and unconventional
- 1:25:57solutions to problems. Being curious,
- 1:25:59seeking out new connections, and keeping
- 1:26:01an open mind are ways to become more
- 1:26:04creative. Projects are comprised of lots
- 1:26:07of small moving parts. Project managers
- 1:26:10should be able to keep an eye on all
- 1:26:12these small parts without losing track
- 1:26:14of them. Spreadsheets, project tracking
- 1:26:16software, and detailed plans help a
- 1:26:19project manager identify, manage, and
- 1:26:21keep track of a project's many details.
- 1:26:24In order to task switch, project
- 1:26:26managers should be able to switch
- 1:26:28between tasks rapidly and efficiently.
- 1:26:31Project managers must keep track of
- 1:26:33numerous tasks simultaneously and go
- 1:26:35back and forth between projects
- 1:26:37frequently and quickly. They need to
- 1:26:39task switch without taking time to
- 1:26:41reorient themselves among the tasks they
- 1:26:44are responsible for.
- 1:26:46Mindsets describe an overall mental
- 1:26:48attitude. They guide how project
- 1:26:50managers approach their work. The main
- 1:26:52mindsets required of project managers
- 1:26:55are characterized by leadership, goal
- 1:26:57orientation, critical thinking,
- 1:26:59collaboration, and problem solving.
- 1:27:02Project managers should remember that
- 1:27:04they are leaders and responsible for the
- 1:27:06growth and success of their team
- 1:27:08members. By setting achievable,
- 1:27:10measurable goals, project managers set
- 1:27:12themselves and their teams up for
- 1:27:14success. Project managers should be able
- 1:27:17to bring a critical lens to their
- 1:27:18project planning and managing
- 1:27:20activities. This will help them find
- 1:27:22effective solutions to problems as they
- 1:27:24arise. Project managers must always be
- 1:27:27conscientious of their teammates and
- 1:27:28other stakeholders. They should approach
- 1:27:31problems and tasks with an attitude of
- 1:27:32cooperation. A problem-solving mindset
- 1:27:35requires project managers to approach
- 1:27:38problems by identifying their causes,
- 1:27:40coming up with possible solutions, and
- 1:27:42then applying the most appropriate one.
- 1:27:46In this video, you learned that project
- 1:27:48management requires many soft skills,
- 1:27:50including proficiencies in research,
- 1:27:53analysis, negotiation, report writing,
- 1:27:55and presentation. competencies such as
- 1:27:58written and oral communication, time
- 1:28:00management, public speaking,
- 1:28:02decision-making, and building effective
- 1:28:04relationships. Traits such as
- 1:28:06selfmotivation, creativity, detail
- 1:28:09orientation, and task switching.
- 1:28:12Mindsets characterized by leadership,
- 1:28:14goal orientation, critical thinking,
- 1:28:16collaboration, and problem solving.
- 1:28:23[Music]
- 1:28:29Welcome to technical skills for project
- 1:28:31management. After watching this video,
- 1:28:34you will be able to list and describe
- 1:28:36the technical skills and competencies
- 1:28:38required for project management.
- 1:28:40While soft skills are becoming
- 1:28:42increasingly important in project
- 1:28:43management, successful project managers
- 1:28:46must also have several technical skills,
- 1:28:48sometimes known as hard skills.
- 1:28:50Organizations expect project managers to
- 1:28:52have technical skills in three areas.
- 1:28:55Project management methodologies and
- 1:28:57processes, business administration and
- 1:28:59management, software and information
- 1:29:02technology.
- 1:29:03Technical skills in project management
- 1:29:05involve managing all aspects of a
- 1:29:07project's life cycle. This means that
- 1:29:10project managers must understand the
- 1:29:12different phases of the project life
- 1:29:13cycle and be familiar with project
- 1:29:15management methodologies such as
- 1:29:17waterfall, agile, canban, pimbach and
- 1:29:21lean. Project managers must also
- 1:29:23understand the role that cost, time and
- 1:29:26resource constraints play in each
- 1:29:27project. Project managers use this
- 1:29:29knowledge of project management
- 1:29:31methodologies to execute the project
- 1:29:33planning process. This is when they will
- 1:29:35define a project scope and goals,
- 1:29:37develop strategies for directing their
- 1:29:39teams, and determine how to complete
- 1:29:41project deliverables within the agreed
- 1:29:42cost, time, and resource budgets.
- 1:29:46A project manager's main role involves
- 1:29:48project execution. To successfully
- 1:29:51execute a project, project managers will
- 1:29:53need to be able to conduct risk
- 1:29:54assessments and take appropriate action
- 1:29:56to mitigate identified risks, which may
- 1:29:59include working with compliance to
- 1:30:01understand legal and regulatory risks.
- 1:30:03They must be able to track and monitor
- 1:30:05project status, identify blockers, and
- 1:30:08escalate issues to appropriate
- 1:30:10stakeholders. Project managers must also
- 1:30:12ensure that teams are complying with
- 1:30:14relevant business processes and policies
- 1:30:16such as standard operating procedures,
- 1:30:19also called SOPs and compliance control
- 1:30:22processes.
- 1:30:24Successful execution of a project will
- 1:30:26also require that project managers be
- 1:30:28comfortable with common business
- 1:30:29administration practices. Project
- 1:30:32managers should have a familiarity with
- 1:30:34identifying business needs and
- 1:30:35determining solutions to business
- 1:30:37problems, developing project budgets and
- 1:30:40monitoring project spending,
- 1:30:41determining, tracking and reporting key
- 1:30:44performance indicators to ensure
- 1:30:46projects meet the defined objectives
- 1:30:48within agreed upon cost, time, and
- 1:30:51resource budgets.
- 1:30:53Since project managers work directly
- 1:30:55with teams and stakeholders to plan and
- 1:30:57execute projects, they should also have
- 1:31:00strong skills in resource planning,
- 1:31:02business process improvement, and change
- 1:31:04management. Project managers are often
- 1:31:07responsible for allocating tasks to team
- 1:31:09members based on capacity and skill sets
- 1:31:12and maximizing team efficiency by
- 1:31:14managing utilization rates and
- 1:31:16monitoring progress. They may also need
- 1:31:18to identify, analyze, and improve
- 1:31:20existing business processes,
- 1:31:22particularly processes that teams can
- 1:31:25reuse between many projects. At times,
- 1:31:28project managers may also need to
- 1:31:29implement strategies that affect change
- 1:31:31and help teams adapt to changes, such as
- 1:31:34transformation of an organization's
- 1:31:36goals, processes, or technologies.
- 1:31:39Project managers must have technical
- 1:31:41skills in software and information
- 1:31:43technology. Project managers use
- 1:31:45software to plan, track, and monitor
- 1:31:47projects as well as collaborate with
- 1:31:49team members and stakeholders. Software
- 1:31:51that project managers are frequently
- 1:31:53expected to be familiar with include
- 1:31:55collaboration tools such as Slack, Zoom,
- 1:31:58and Microsoft Teams. Productivity suites
- 1:32:01that include spreadsheets, email,
- 1:32:03calendar, and word processing programs
- 1:32:05such as Microsoft Office and Google
- 1:32:07Workspace. project management tools such
- 1:32:10as ASA, ZenHub, Jira, GitHub, and
- 1:32:14Trello.
- 1:32:15Project managers may also benefit from
- 1:32:18data management skills and a working
- 1:32:20knowledge of cloud technologies. Data
- 1:32:22management involves understanding basic
- 1:32:24database structures such as relational
- 1:32:26databases and organizing and modifying
- 1:32:29data. Project managers may use data to
- 1:32:31understand market trends and user needs
- 1:32:34as well as visualizing key performance
- 1:32:36indicators or product testing data.
- 1:32:38Project managers may also need to use
- 1:32:40software and tools within a cloud
- 1:32:41environment. So they should be aware of
- 1:32:43various cloud technologies and services.
- 1:32:46Data analysis and reporting tools
- 1:32:47include IBM Cognos, Salesforce, Tableau,
- 1:32:50and Google Looker.
- 1:32:53If you are interested in being an IT
- 1:32:55project manager, organizations may
- 1:32:57require additional specialized skills.
- 1:33:00Common skills needed for IT project
- 1:33:02managers include knowledge of the
- 1:33:04software development life cycle, also
- 1:33:06known as the SDLC, knowledge of
- 1:33:09object-oriented analysis and design,
- 1:33:12also called O A, which breaks
- 1:33:14applications into objects and develops
- 1:33:16requirements and designs around objects
- 1:33:18and their relationships. Experience with
- 1:33:21agile and waterfall project management
- 1:33:23and development methodologies, knowledge
- 1:33:25of the practices, tools, and
- 1:33:28philosophies critical to DevOps, which
- 1:33:30brings software development and IT
- 1:33:32operations together to reduce software
- 1:33:34time to market. Some familiarity with
- 1:33:37program languages such as Python, C,
- 1:33:40Java, JavaScript, or CSS, which can be
- 1:33:44useful for communication with
- 1:33:45development teams.
- 1:33:47Additional skills are often required for
- 1:33:49IT project managers who manage IT
- 1:33:51projects, including incident management
- 1:33:54to respond to unexpected interruptions
- 1:33:57and restoration of services, monitoring,
- 1:33:59managing, and optimizing an
- 1:34:01organization's information technology
- 1:34:03systems. Quality management to ensure
- 1:34:05the quality and consistency of a product
- 1:34:07or service using QA processes and
- 1:34:10software testing methodologies.
- 1:34:12information system security and security
- 1:34:14standards to ensure the safety of
- 1:34:16information system assets, IT
- 1:34:19fundamentals such as hardware, operating
- 1:34:21systems, software and applications,
- 1:34:23networking, storage, cyber security and
- 1:34:26cloud, and the technology landscape
- 1:34:29related to the product area they operate
- 1:34:31in. In this video, you learned that
- 1:34:34there are many technical skills that may
- 1:34:36be expected of a project manager. These
- 1:34:38largely fall into several categories.
- 1:34:41project management methodologies and
- 1:34:43processes such as project life cycles
- 1:34:45and executing project planning
- 1:34:46processes, business administration and
- 1:34:49management such as budgeting and KPIs.
- 1:34:52Software and information technology such
- 1:34:54as collaboration tools, productivity
- 1:34:56suites, and project management tools.
- 1:34:58Additional skills required for IT
- 1:35:00project managers include incident
- 1:35:02management, monitoring, quality
- 1:35:05management, and cyber security.
- 1:35:12[Music]
- 1:35:17Welcome to expert viewpoints necessary
- 1:35:20project management skills. In this video
- 1:35:24we will hear from project managers
- 1:35:25discussing the skills needed to become a
- 1:35:27successful project manager.
- 1:35:31>> They have to have the ability to listen
- 1:35:33well. uh they need to know how to deal
- 1:35:37with people in a way that can keep them
- 1:35:41happy, keep them motivated, but also
- 1:35:43keep them honest. You know, make sure
- 1:35:45that the work is truly getting done. Uh
- 1:35:49besides that, you know, it can depend.
- 1:35:51Uh you can be a great project manager uh
- 1:35:56with, you know, tremendous technical
- 1:35:58skills. You know, you could come from
- 1:36:00being a coder uh or you can just uh be
- 1:36:04extremely good at learning
- 1:36:08>> to be successful as a project manager.
- 1:36:10You need several different skills. It's
- 1:36:12not just about knowing who is who in the
- 1:36:15company within the cross functional
- 1:36:16teams. That is great to know. You also
- 1:36:19need to know a little bit about the
- 1:36:20product or service that you are
- 1:36:22implementing or trying to complete for
- 1:36:24the overall project. With that, you
- 1:36:26should also have negotiation skills.
- 1:36:28Sometimes you're going to need resources
- 1:36:30at certain hours and it might not work
- 1:36:32for you because they're working on
- 1:36:34another project. You need to be able to
- 1:36:36persuade in order to get that person to
- 1:36:38work additional hours with your project
- 1:36:41versus another one because it's more
- 1:36:43important.
- 1:36:45I think project managers also need to
- 1:36:47have some level of uh computer skills
- 1:36:50and technology skills, especially if
- 1:36:53they want to get into the IT industry or
- 1:36:57become, you know, a project manager for
- 1:37:00a company that deals primarily in
- 1:37:03technology. I think you know a basic
- 1:37:06understanding of some of the tools like
- 1:37:09word processing, presentation software,
- 1:37:12spreadsheet software are critical. Uh
- 1:37:16you'll be doing a lot of as a project
- 1:37:18manager you'll be doing a lot of writing
- 1:37:21documentation, creating presentations,
- 1:37:25looking at data and using spreadsheets
- 1:37:27for that.
- 1:37:29The skills needed to become a successful
- 1:37:32project manager are problem solving
- 1:37:36because there are going to be problems
- 1:37:39that come up with different milestones,
- 1:37:41different people on a project, external,
- 1:37:44internal stakeholders, problems are
- 1:37:46going to come up. So being able to think
- 1:37:48on your feet pretty quickly and problem
- 1:37:51solve is very important. And at that
- 1:37:54same token, being creative, being
- 1:37:56creative in those problem solving skills
- 1:37:59is extremely important because there's
- 1:38:01not always going to be a process written
- 1:38:03out for how to identify the problems and
- 1:38:05how to get solutions. So to be able to
- 1:38:08creatively think about something,
- 1:38:09creatively collaborate with your team
- 1:38:12and and figuring out solutions will be
- 1:38:14really important. So problem solving and
- 1:38:17creativity.
- 1:38:19To be honest, I could probably talk for
- 1:38:21hours on this particular subject, but
- 1:38:23I'm going to narrow it down to three key
- 1:38:26skills. Skill number one, effective
- 1:38:29communications. Learn as much about
- 1:38:31effective communications as you can. If
- 1:38:34you have an opportunity to communicate,
- 1:38:37take that opportunity no matter how
- 1:38:39uncomfortable it may be. The better you
- 1:38:42communicate, the more successful your
- 1:38:44potential is to become as a project
- 1:38:47manager. Secondly, understand
- 1:38:49situational leadership. Everyone is
- 1:38:52different. A good project manager leads
- 1:38:55situationally. They analyze the
- 1:38:58audience. They analyze the stakeholders
- 1:39:00and they adjust their leadership style
- 1:39:02to go ahead and meet the needs and
- 1:39:04hopefully meet the needs to motivate and
- 1:39:07commit the individuals that you are
- 1:39:10leading. Third, build trust. Trust is a
- 1:39:14common denominator that is required
- 1:39:16before any project team can actually
- 1:39:19become a team. Share information, be
- 1:39:23vulnerable, and encourage others to be
- 1:39:26vulnerable as well. If you can establish
- 1:39:29a trusting relationship with
- 1:39:30stakeholders in the team, then the
- 1:39:33project will in all likelihood go very
- 1:39:35very far.
- 1:39:36[Music]
- 1:39:47Welcome to intrapersonal skills and
- 1:39:49leadership in project management. After
- 1:39:52watching this video, you will be able to
- 1:39:54describe the need for interpersonal and
- 1:39:56leadership skills when managing a
- 1:39:58project. List leadership skills that are
- 1:40:00crucial to project management.
- 1:40:03Interpersonal skills and leadership are
- 1:40:05invaluable skills for project managers.
- 1:40:07Project managers are not only managers
- 1:40:09but leaders for their teams. In addition
- 1:40:12to managing many aspects of a project,
- 1:40:14they are also responsible for leading a
- 1:40:16group of different team members and
- 1:40:17stakeholders often with varying
- 1:40:19backgrounds, experiences, and opinions.
- 1:40:22Project leadership brings together team
- 1:40:24members in order to work towards a
- 1:40:25common goal. There is no rulebook or set
- 1:40:28steps to becoming a leader, and many
- 1:40:30personality types can effectively lead a
- 1:40:32team.
- 1:40:33Leadership and management are similar
- 1:40:35skills with plenty of overlap, but they
- 1:40:37also have distinctions. Management
- 1:40:39involves methodically planning,
- 1:40:41organizing, and coordinating tasks and
- 1:40:44resources. This could include budgeting
- 1:40:46and creating schedules and working with
- 1:40:48outside contractors. On the other hand,
- 1:40:51leadership involves motivating and
- 1:40:53encouraging others. Leadership is not
- 1:40:55about controlling team members, but more
- 1:40:57about enabling them to do their best.
- 1:41:00Project managers must be both managers
- 1:41:02and leaders. They need to not only
- 1:41:04manage details but also often need to
- 1:41:06inspire a team and communicate a guiding
- 1:41:08vision for everyone to work towards.
- 1:41:11Being a leader involves a wide range of
- 1:41:14interpersonal skills. These skills
- 1:41:16include communication, team building,
- 1:41:18motivation, trust building, conflict
- 1:41:21management. We will discuss examples of
- 1:41:24each category that are helpful for a
- 1:41:26project manager success.
- 1:41:28Project managers should be able to
- 1:41:30effectively communicate with their team
- 1:41:32members. Communication not only includes
- 1:41:34the ability to speak and persuade, but
- 1:41:36the ability to ask the right questions
- 1:41:38and listen. Project managers should also
- 1:41:41be able to facilitate effective
- 1:41:43communication between individual team
- 1:41:45members and groups such as different
- 1:41:47departments in an organization.
- 1:41:50Project managers should be able to build
- 1:41:52teams across the organization. Because
- 1:41:54project teams often involve people from
- 1:41:56across departments, project managers
- 1:41:58must bring these people together to
- 1:42:00achieve a common goal. Even if they have
- 1:42:02different interests in the project,
- 1:42:04project managers can use their knowledge
- 1:42:06of a team's skills, personality traits,
- 1:42:09and interests to not only form teams,
- 1:42:11but also to foster team relationships.
- 1:42:15Project managers should be able to
- 1:42:16motivate the team and stakeholders.
- 1:42:18Project managers must be able to
- 1:42:20maintain morale, encourage team members
- 1:42:22to do their best, and keep them
- 1:42:24interested in their work on the project.
- 1:42:26Project managers must understand the
- 1:42:28needs and motivators of each team member
- 1:42:30and stakeholder on the project and use
- 1:42:32that knowledge to help the team meet the
- 1:42:33objectives of the project and be
- 1:42:35satisfied with the work they are
- 1:42:36accomplishing. Project managers should
- 1:42:39be able to build trust in the team.
- 1:42:41Project managers should foster an
- 1:42:42environment of trust between the team
- 1:42:44members and stakeholders involved in a
- 1:42:46project. Trust is an important element
- 1:42:48of project success and can lead to more
- 1:42:51effective communication, increased
- 1:42:53productivity, and decreased risk.
- 1:42:55Project managers can build trust by
- 1:42:57following through on their commitments
- 1:42:59and creating an environment where team
- 1:43:01members feel comfortable discussing
- 1:43:02project blockers and giving honest
- 1:43:04feedback.
- 1:43:06Project managers should be able to
- 1:43:08manage conflict. Given the diversity of
- 1:43:11most project teams, conflict is often
- 1:43:13unavoidable. Project managers can avoid
- 1:43:16some conflict by clearly defining
- 1:43:18project objectives, roles, and
- 1:43:20responsibilities from the beginning of
- 1:43:21the project. When conflict does arise,
- 1:43:24they can use a number of conflict
- 1:43:26resolution strategies to mitigate the
- 1:43:28impact of the conflict. There are
- 1:43:30usually five steps to conflict
- 1:43:32resolution: acknowledgement,
- 1:43:34clarification, mediation, solution
- 1:43:37identification, and monitoring. Let's
- 1:43:40look at an application of this strategy
- 1:43:42in practice next.
- 1:43:44For example, say Marty is new to a
- 1:43:47project that Gene has been working on
- 1:43:48for weeks. Marty needs guidance from
- 1:43:51Jean, but Gene is up against a tight
- 1:43:53deadline. Consequently, they both feel
- 1:43:55frustrated with each other because Gene
- 1:43:57doesn't feel like Marty is doing her
- 1:43:59share of the work, and Marty feels
- 1:44:01discouraged because she doesn't know how
- 1:44:02to get started. The first step is
- 1:44:04acknowledgement. As the project manager,
- 1:44:07you let them know you recognize the
- 1:44:09issue. Next, you clarify. You ensure
- 1:44:12they know you are aware of the problem.
- 1:44:15Third, you mediate by discussing the
- 1:44:17issue with both of them. Then, as the
- 1:44:20solution, you find another resource to
- 1:44:22help reduce Gene's workload and confirm
- 1:44:24with Gene that he now has the bandwidth
- 1:44:26to assist Marty. And you let Marty know
- 1:44:29Gene has been under a tight deadline,
- 1:44:31but you have found someone else to
- 1:44:32assist with some administrative tasks.
- 1:44:34Gene and Marty now have some time to
- 1:44:36work together. For the last step,
- 1:44:38followup. You check in later to ensure
- 1:44:41that Marty gets the training from Gene
- 1:44:42she needs.
- 1:44:45In this video, you learned that
- 1:44:47interpersonal and leadership skills help
- 1:44:49project managers to work more
- 1:44:51effectively with team members and
- 1:44:53stakeholders. In addition to the
- 1:44:54managerial skills that help project
- 1:44:56managers work with budgets, resources,
- 1:44:58and schedules, leadership skills help
- 1:45:00project managers inspire a team to work
- 1:45:02towards a shared vision. Some of the
- 1:45:04interpersonal skills needed for
- 1:45:06leadership in project management include
- 1:45:08communication, team building,
- 1:45:10motivation, trust building, and conflict
- 1:45:13management. There is no single best way
- 1:45:15to utilize these skills, and project
- 1:45:17managers benefit from having a variety
- 1:45:19of styles that they can draw on to lead
- 1:45:21a project.
- 1:45:27[Music]
- 1:45:33Welcome to project manager
- 1:45:35responsibilities.
- 1:45:36After watching this video, you will be
- 1:45:39able to list the responsibilities of a
- 1:45:41project manager. Describe the
- 1:45:43responsibilities of a project manager.
- 1:45:46Project managers have several
- 1:45:48responsibilities throughout the life
- 1:45:49cycle of a project. A responsibility is
- 1:45:52something that the project manager is
- 1:45:54accountable for that is within their
- 1:45:55control. Project managers are
- 1:45:58responsible for project planning,
- 1:46:00project execution, project monitoring
- 1:46:02and reporting, post- project evaluation,
- 1:46:06and project closing. Project managers
- 1:46:08fulfill these responsibilities by
- 1:46:10completing a number of tasks before,
- 1:46:12during, and after a project. Tasks are
- 1:46:15definable pieces of work that are
- 1:46:17assigned to, or expected of the project
- 1:46:19manager. One of the primary
- 1:46:21responsibilities of a project manager is
- 1:46:23project planning which begins as soon as
- 1:46:26the project initiates. Project managers
- 1:46:28are responsible for making sure that
- 1:46:30project goals and deliverables have been
- 1:46:32determined and that there is a plan in
- 1:46:34place to meet those objectives. During
- 1:46:36the planning phase, project managers
- 1:46:38build a project overview or business
- 1:46:40case to define project objectives and
- 1:46:43identify key performance indicators or
- 1:46:45success metrics for the project.
- 1:46:47Estimate the time and effort required to
- 1:46:49complete a project and create a project
- 1:46:52plan canben board or gant chart that
- 1:46:54clarifies the project plan and schedule.
- 1:46:57Project managers developed a project
- 1:46:59budget. They must create a financial
- 1:47:01plan that outlines the anticipated usage
- 1:47:03of project resources. This budget
- 1:47:06includes costs, profits, expenditures,
- 1:47:08and sources of funding. Project plans
- 1:47:11and budgets can be created for the
- 1:47:12entire project, such as in a waterfall
- 1:47:15or hybrid project management model, or
- 1:47:17they can be created for a small
- 1:47:19definable portion of the project, as in
- 1:47:21the case of agile.
- 1:47:23Once a project plan is in place, the
- 1:47:25project manager is responsible for the
- 1:47:27execution of the project and making sure
- 1:47:29that team members deliver on project
- 1:47:31objectives. To do this, project managers
- 1:47:33must create, disperse, and maintain an
- 1:47:36accountability matrix to help team
- 1:47:38members understand their individual
- 1:47:40roles and responsibilities, as well as
- 1:47:43resource and utilization plans that
- 1:47:45guide the management of project
- 1:47:46resources and a risk assessment and
- 1:47:50issue management tracker to facilitate
- 1:47:52risk and issue management.
- 1:47:55During the project, project managers are
- 1:47:57also responsible for monitoring and
- 1:47:59reporting on the project's development.
- 1:48:01They must monitor the project's
- 1:48:02execution compared to time, cost, and
- 1:48:05resource plans created during the
- 1:48:07planning phase. Communication is also a
- 1:48:10key responsibility of project managers,
- 1:48:12and they must ensure that stakeholders
- 1:48:14receive regular reports regarding the
- 1:48:16status of the project. The project
- 1:48:18manager must determine who needs to
- 1:48:20receive what specific information, when
- 1:48:22they will receive it, and what
- 1:48:23communication channels will be used to
- 1:48:26facilitate monitoring, reporting, and
- 1:48:28communication. Project managers may
- 1:48:31build project dashboards to monitor the
- 1:48:33status of projects, track risks and
- 1:48:36issues, and then communicate project
- 1:48:38status with all stakeholders. Project
- 1:48:40managers may also facilitate regular
- 1:48:42meetings with stakeholders, keeping
- 1:48:44detailed agendas and notes to discuss
- 1:48:45the status of the project. They also
- 1:48:48need to track resources and costs and
- 1:48:50may need to participate in a time sheet,
- 1:48:52invoice, or expense approval. These
- 1:48:55responsibilities require project
- 1:48:56managers to keep track of several
- 1:48:58details about team members and
- 1:49:00stakeholders as well as the project
- 1:49:02itself. There are several project
- 1:49:03management, communication, and
- 1:49:05collaboration tools that can assist
- 1:49:07project managers with these tasks and
- 1:49:09responsibilities.
- 1:49:11Finally, project managers are also
- 1:49:13responsible for the evaluation and
- 1:49:15closing of a project. They must be able
- 1:49:17to critically assess a project's
- 1:49:19performance, whether the project met its
- 1:49:21defined goals and objectives, and how
- 1:49:23the team may improve the process in the
- 1:49:25future. After evaluating the project,
- 1:49:27they must ensure that all project
- 1:49:29deliverables and information are
- 1:49:30finalized, stored, and dispersed for
- 1:49:33future use. Project managers may review
- 1:49:36project deliverables and evaluate key
- 1:49:38performance indicators or KPIs, which
- 1:49:40provide quantifiable measures of
- 1:49:42performance. These indicators help
- 1:49:45project managers evaluate the efficiency
- 1:49:47and effectiveness of a project's
- 1:49:49performance and delivery. Using this
- 1:49:51data, they can identify strengths and
- 1:49:53weaknesses in the project process and
- 1:49:55target areas for improvement. This stage
- 1:49:57is also an opportunity to highlight what
- 1:50:00went well and reward team members for
- 1:50:02strong performances.
- 1:50:04Project managers may also create a post-
- 1:50:06project report or hold a retrospective
- 1:50:09where they document key project
- 1:50:11learnings and possible process
- 1:50:12improvements. They may also ensure that
- 1:50:15all project deliverables are packaged
- 1:50:16and project information is archived and
- 1:50:19readily available for future use if
- 1:50:21needed.
- 1:50:23In this video, you learned that a
- 1:50:25project manager's responsibilities
- 1:50:27include project planning, execution,
- 1:50:30monitoring, reporting, evaluation, and
- 1:50:33closing a project. Project planning and
- 1:50:36execution is the initial phase that
- 1:50:38establishes a project's goals,
- 1:50:39deliverables, and schedule. While
- 1:50:42monitoring and reporting, project
- 1:50:44managers assess and communicate project
- 1:50:46status to all stakeholders. and
- 1:50:48evaluation and closing involve
- 1:50:50assessment of the project's
- 1:50:51effectiveness after its completion,
- 1:50:53packaging project deliverables, and
- 1:50:55archiving project information.
- 1:51:02[Music]
- 1:51:07Welcome to a day in the life of a
- 1:51:10project manager. Hi, I'm Ner and I work
- 1:51:13as a project manager for a large
- 1:51:15enterprise in Seattle. When I arrive at
- 1:51:18work in the morning, I spend some time
- 1:51:20reviewing my email I receive overnight
- 1:51:22and review messages on Slack, our team
- 1:51:24communication tool. I also take a quick
- 1:51:27look at my calendar to see what meetings
- 1:51:29I have for the day. We just finished the
- 1:51:31design phase of our project and began
- 1:51:33the implementation phase. I need to
- 1:51:35check in with the development lead to
- 1:51:37ensure her team is ready to start this
- 1:51:38stage of the project. Later in the day,
- 1:51:41I'm running our weekly project status
- 1:51:43meeting with our stakeholders. I spend a
- 1:51:46few minutes creating some agenda notes
- 1:51:48for our status meeting, and I make a
- 1:51:49copy of our meeting note templates for
- 1:51:51both the standup and our status meeting.
- 1:51:54Before the meeting, I review our project
- 1:51:57plan and task tracker to see what tasks
- 1:51:59are currently in progress. I want to
- 1:52:01ensure the team has all the resources
- 1:52:03they need for the implementation phase
- 1:52:05of the project. I also review our risk
- 1:52:08assessment and issue log to make sure
- 1:52:10I'm prepared to address any blocking
- 1:52:11issues that the team may bring up during
- 1:52:13our status meeting.
- 1:52:15Next, I meet with the development lead.
- 1:52:18We discuss the makeup of the team and
- 1:52:19who is assigned to deliver the various
- 1:52:21pieces of the project. She informs me
- 1:52:23that they're down a person due to infant
- 1:52:25care leave and won't be able to meet the
- 1:52:27scheduled dates without a replacement.
- 1:52:30We discuss a few strategies and schedule
- 1:52:32options that we can bring to the team at
- 1:52:33the status meeting later in the day. I
- 1:52:36also commit to discussing the matter
- 1:52:37with our manager. After my meeting, I
- 1:52:40review the project schedule and begin
- 1:52:42planning for the next phases.
- 1:52:43Implementation is planned to take 3
- 1:52:46months, which brings us up against a
- 1:52:48corporate holiday and a time of the year
- 1:52:50when many people take off. I built that
- 1:52:53into the schedule already, but design
- 1:52:55took longer than we planned. So, I make
- 1:52:57a few adjustments to accommodate the
- 1:52:58delay. I send an email to all the
- 1:53:01project leads to let them know of the
- 1:53:03adjustment and inform their teams. I
- 1:53:05plan on reinforcing this schedule update
- 1:53:07during the upcoming status meeting.
- 1:53:09After a meeting with my manager, it's
- 1:53:11time for lunch. I have lunch with
- 1:53:13another project manager, Matt, who is
- 1:53:16getting ready to kick off another
- 1:53:17project. We talk about how the project
- 1:53:19will be resourced and realized that her
- 1:53:21project will require some of the same
- 1:53:23resources that currently are on my
- 1:53:24project. We discussed the timelines for
- 1:53:27both our projects and confirmed there
- 1:53:29will be an overlap. We spent some time
- 1:53:32discussing how we can accommodate both
- 1:53:33projects using the resources across the
- 1:53:36teams. We agreed that we need to raise
- 1:53:38the situation with our manager so he's
- 1:53:40aware. Met also lets me note that she's
- 1:53:43been told the vendor budget might be
- 1:53:45expanded next year. We discuss the
- 1:53:47impact of this and she suggests that it
- 1:53:49is one way we might be able to address
- 1:53:51our problem with overlapping resources.
- 1:53:54Next, I have a meeting with my program
- 1:53:56manager to inform him of the status of
- 1:53:58the project. We talk about the previous
- 1:54:00phase, the design phase, and how that
- 1:54:03went. We talk about the outcome of that
- 1:54:05phase and how it will impact
- 1:54:06implementation. I tell him that we are
- 1:54:09down a designer and a developer and that
- 1:54:11we could use some vendor budget so we
- 1:54:13can hire temporary employees to fill in
- 1:54:14for the gaps. I also inform him of the
- 1:54:17schedule update and he tells me that I
- 1:54:19need to pull my dates in a few days. We
- 1:54:21talk about options for doing this and
- 1:54:23decide that if he's able to get the
- 1:54:25vendor budget, we may be able to bring
- 1:54:27the schedule in a couple of days. We
- 1:54:29decided to table the discussion until he
- 1:54:31explores the vendor budget question.
- 1:54:33During the design phase, I offered to
- 1:54:35help the design manager transcribe
- 1:54:37videos from a previous project. By doing
- 1:54:40this work, it helps me stay plugged into
- 1:54:42the team and better understand the work
- 1:54:44they do on a daily basis. After lunch, I
- 1:54:47spend an hour on this project and then
- 1:54:48inform the design manager of my
- 1:54:50progress. I then have a meeting with the
- 1:54:52test manager and the development manager
- 1:54:54to discuss a conflict between two of
- 1:54:56their direct reports. The tester and the
- 1:54:58developer disagree about how much
- 1:55:00tolerance to allow on an error
- 1:55:02condition.
- 1:55:03The developer believes there should be
- 1:55:05more room for the condition to trigger
- 1:55:06and the tester wants the numbers to be
- 1:55:08tighter. Both managers agree that there
- 1:55:10isn't a clear answer on which position
- 1:55:12to prefer, but the test manager agrees
- 1:55:15to take the developer position and take
- 1:55:17point in communicating that message to
- 1:55:18both teams.
- 1:55:20During the project status meeting, I
- 1:55:22share updates with the project
- 1:55:23stakeholders and answer any concerns
- 1:55:26that the stakeholders have. We invited a
- 1:55:28member of our leadership to join the
- 1:55:29status meeting as she had some
- 1:55:31information to share. Our leadership is
- 1:55:33happy with the progress that we've made
- 1:55:35in the design phase, but lets the team
- 1:55:37know that there is a new requirement for
- 1:55:38the product based on some compliance and
- 1:55:40policy changes. We discuss the new
- 1:55:43requirement and address potential
- 1:55:45impacts to the overall timeline. We end
- 1:55:48the meeting by reviewing the plan for
- 1:55:49the following week and determining
- 1:55:51agenda items for the next meeting. I
- 1:55:53spend the rest of my afternoon answering
- 1:55:54emails, checking Slack for any new
- 1:55:56messages, and updating our schedule
- 1:55:58based on the conversations I had today.
- 1:56:01I also create a few new scheduling
- 1:56:03models to test some other ideas in case
- 1:56:05the published version doesn't work. I
- 1:56:07also work on an executive summary of the
- 1:56:09current status of the project and
- 1:56:11archive files on our file share from the
- 1:56:13design phase. Before I know it, it's
- 1:56:15time to head home.
- 1:56:21[Music]
- 1:56:27Welcome to Expert Viewpoints, a day in
- 1:56:29the life of a project manager. In this
- 1:56:32video, we will hear from project
- 1:56:34managers discussing a typical day
- 1:56:36working as a project manager.
- 1:56:38>> Let me introduce a new concept if you've
- 1:56:41never heard of it before. It's called
- 1:56:42WBS, the work breakdown structure. A
- 1:56:45work breakdown structure is a
- 1:56:47hierarchial breakout of all of the
- 1:56:50different tasks that are required
- 1:56:52hopefully in the order in which they
- 1:56:54need to occur. A good project manager
- 1:56:56will create a work breakdown structure
- 1:56:58and that particular work breakdown
- 1:57:00structure will guide his and her every
- 1:57:04day. You take a look at what has been
- 1:57:06accomplished. You take a look at what is
- 1:57:08in progress. You take a look at what is
- 1:57:11planned and you plan accordingly.
- 1:57:14I love to start my day out with a cup of
- 1:57:16coffee and just read through my emails
- 1:57:18to see what is needed, any big tasks
- 1:57:21that are added or any updates for
- 1:57:23projects. From there, I typically have
- 1:57:26about 3 to four technical meetings and
- 1:57:28they could be a configuration call or a
- 1:57:30design call for example. Then I also
- 1:57:34have about 2 to three PM syncs. And with
- 1:57:37those PM syncs, let's just check in with
- 1:57:39our stakeholders to let them know
- 1:57:41updates, give them the weekly reports.
- 1:57:44And then from there, I love to make sure
- 1:57:46that all my accounts are updated with
- 1:57:48the weekly notes or just what happened
- 1:57:50throughout that day. And then I will go
- 1:57:53ahead and close out my day.
- 1:57:54>> Since I'm running uh a lot of agile
- 1:57:57projects over the last years, uh very
- 1:58:00much the day um starts with standups. Uh
- 1:58:03my last project I was managing four
- 1:58:06different projects at one point. So that
- 1:58:08meant uh four different virtual
- 1:58:10standsups using Zoom uh every morning.
- 1:58:14After that it's really a matter of
- 1:58:17keeping organized you know using
- 1:58:20whatever tools you have uh Jira uh we've
- 1:58:23been using uh most recently for
- 1:58:26organizing and keeping track of all the
- 1:58:28tasks. Uh then within Outlook I use um
- 1:58:33you know tasks to keep track of
- 1:58:36everything I need to do. uh early in the
- 1:58:39morning it's reviewing all the emails,
- 1:58:42responding, making sure nothing new has
- 1:58:45come up and then throughout the day
- 1:58:48checking with the team uh slowly going
- 1:58:52through and figuring out who needs uh
- 1:58:55assistance, what can I do to empower
- 1:58:57them to uh do the job well?
- 1:59:01And uh then throughout the rest of the
- 1:59:04day, it's really a matter of working on
- 1:59:06all the various tasks. There may be
- 1:59:08documentation, there may be budgeting,
- 1:59:11there may be uh people that need to be
- 1:59:13hired uh or found even.
- 1:59:16>> A typical day in my job will always
- 1:59:18start with me taking a look at our
- 1:59:20milestone calendars to see which date is
- 1:59:23coming up the soonest. And depending on
- 1:59:25where we are on that calendar and how
- 1:59:27that milestone is doing, that'll base
- 1:59:30how the rest of my day is going to go.
- 1:59:32So, if we are approaching a milestone
- 1:59:34date and I haven't heard from that
- 1:59:35stakeholder about the progress for that
- 1:59:38particular milestone, then I'll check in
- 1:59:39with them, see where we're at, and if
- 1:59:41there's an obstacle in making sure that
- 1:59:43milestone is completed, then I'll
- 1:59:45contact that stakeholder, see how we
- 1:59:47need to mitigate the issue, whether we
- 1:59:49have to meet or gather other
- 1:59:52stakeholders at hand or figure out a
- 1:59:53plan B. Then that's what I do next. And
- 1:59:56then I also typically start to plan for
- 1:59:59the next phase. So depending on how much
- 2:00:03problem solving is involved in the
- 2:00:04beginning of the day, then during the
- 2:00:06end of the day, I'll start to take a
- 2:00:08look through what's coming up next and
- 2:00:11identifying pieces of that project from
- 2:00:13there.
- 2:00:15>> What is routine and what do you only do
- 2:00:18once or twice in a project?
- 2:00:20>> The project charter.
- 2:00:22A project charter is a document that
- 2:00:24should be created once. It's very very
- 2:00:26high level. And the purpose of a project
- 2:00:29charter is to describe what the project
- 2:00:32is, why it's important, and who needs to
- 2:00:34be involved. According to the project
- 2:00:37management institute, a project charter
- 2:00:40rarely changes. Everything that you will
- 2:00:43do is going to be based on that
- 2:00:45particular project charter in terms of
- 2:00:47planning, execution, control, and
- 2:00:50closure.
- 2:00:52>> Typically, I will only do a kickoff call
- 2:00:54once at the beginning of the project.
- 2:00:57Otherwise, we might do it again if we
- 2:00:59have a different team that is taking
- 2:01:01over for a different part of the project
- 2:01:04like a new product for example.
- 2:01:06Typically, we also only review over the
- 2:01:08project once. You should have a very
- 2:01:10good understanding at the beginning of
- 2:01:12what is needed and what the scope is.
- 2:01:15You can of course reference back to the
- 2:01:16scope. However, doing that true thorough
- 2:01:20review of the scope of the project
- 2:01:22should only really be done once. and
- 2:01:24then a transition of the project over to
- 2:01:27our support team for example or another
- 2:01:29team if anything else is needed.
- 2:01:32>> You know something that's not really
- 2:01:33routine that happens every once in a
- 2:01:35while is you might have a conflict
- 2:01:37between two team members that you need
- 2:01:39to resolve and you need as a project
- 2:01:42manager you work to facilitate getting
- 2:01:45those challenges and those issues
- 2:01:47resolved. I think that occasionally on a
- 2:01:50project, you'll have a time where you
- 2:01:54miss a deadline or a big issue comes up
- 2:01:58or a risk that you've tried to mitigate
- 2:02:00actually happens. And then you have to
- 2:02:03spend time working through those um
- 2:02:06those risks and mitigating those those
- 2:02:09issues.
- 2:02:14[Music]
- 2:02:20Welcome to careers in project
- 2:02:22management. After watching this video,
- 2:02:25you will be able to list possible
- 2:02:27positions for project managers from the
- 2:02:29entry level to senior level, their
- 2:02:31responsibilities, and average salaries.
- 2:02:34Describe the projected growth in project
- 2:02:36management oriented employment.
- 2:02:38Industries are changing. Rather than
- 2:02:41role-based, they are increasingly
- 2:02:43becoming project-based. Industries are
- 2:02:45finding that a project-based approach
- 2:02:47leads to innovation and allows more
- 2:02:49efficient operations, readily responding
- 2:02:51to increases or decreases in demand.
- 2:02:54Ultimately, this means there is a
- 2:02:56greater need for project management
- 2:02:58across most industries.
- 2:03:00Depending on knowledge and experience,
- 2:03:02project managers can find roles at all
- 2:03:04levels of an organization, including
- 2:03:06entry level, mid-level, and executive
- 2:03:08levels. Entry- level project management
- 2:03:11positions include assistant project
- 2:03:13manager or project coordinator roles.
- 2:03:16Assistant project managers and project
- 2:03:17coordinators are similar roles. Other
- 2:03:20similar roles are called project
- 2:03:22associate or associate project manager.
- 2:03:25They support project managers in various
- 2:03:27administrative and technical tasks.
- 2:03:30These positions can expect to schedule
- 2:03:32meetings, update reports, and identify
- 2:03:34resource requirements. These roles
- 2:03:37require very little to no project
- 2:03:38management experience. Entry-level
- 2:03:41project managers can expect to make an
- 2:03:42average of $55 to $65,000 a year. With
- 2:03:46some experience, there are many
- 2:03:48mid-career level jobs for project
- 2:03:50managers. These positions might include
- 2:03:52being a project manager, a scrum master,
- 2:03:55or a project team lead. In some
- 2:03:57organizations, a project manager can be
- 2:04:00called a project officer or project
- 2:04:02engineer. A mid-level project manager
- 2:04:05tends to take on a leadership role with
- 2:04:07regard to the project team and makes an
- 2:04:09average salary of about 78,000 a year.
- 2:04:12And scrum masters specialize in scrum, a
- 2:04:15framework or product development, and
- 2:04:17they help teams plan and meet their
- 2:04:18goals. They take on a facilitator role
- 2:04:21rather than a leadership one. They earn
- 2:04:23an average of $97,000 a year. Project
- 2:04:27team leads have expertise in the field
- 2:04:28in which they are leading the team. They
- 2:04:30specialize in motivating a team,
- 2:04:32managing conflict, and understanding the
- 2:04:35strengths and synergies of team members.
- 2:04:37They make an average of $81,000 a year.
- 2:04:40Mid-level roles typically require some
- 2:04:42project management experience, a degree
- 2:04:44in a relevant field, such as business
- 2:04:46administration, and or a project
- 2:04:48management certification.
- 2:04:50Project managers can also find roles at
- 2:04:53the executive level. Positions at the
- 2:04:55executive level may include senior
- 2:04:57project manager or director of project
- 2:04:59management. A senior project manager
- 2:05:02typically has at least 10 years of
- 2:05:04experience supervising projects,
- 2:05:06planning strategies, and leading teams.
- 2:05:09They develop project plans, host project
- 2:05:11meetings, and coordinate vendor and
- 2:05:13supplier resourcing. The average salary
- 2:05:15of a senior project manager is $97,000.
- 2:05:19A director of project management is
- 2:05:22usually the highest position in project
- 2:05:23management. A director of project
- 2:05:26management provides strategic directions
- 2:05:27for a company's projects by defining how
- 2:05:30those projects fit into the business's
- 2:05:31strategy and goals. The average salary
- 2:05:34of a director of project management is
- 2:05:36$146,000.
- 2:05:39Project management is a rapidly growing
- 2:05:41field. According to the Project
- 2:05:43Management Institute or PMI, the global
- 2:05:46economy will require 2.3 million new
- 2:05:49project professionals every year to
- 2:05:51close the talent gap by 2030. A recent
- 2:05:54survey by the PMI revealed that project
- 2:05:56management was one of the top five areas
- 2:05:58that business leaders sought to
- 2:06:00prioritize.
- 2:06:01The growth rate of project management
- 2:06:03oriented employment is expected to be
- 2:06:05higher than overall employment in
- 2:06:07industries that are becoming
- 2:06:08increasingly projectoriented.
- 2:06:11This includes industries such as
- 2:06:13information and publishing, finance and
- 2:06:15insurance, and manufacturing and
- 2:06:17construction. According to an analysis
- 2:06:20of US Bureau of Labor Statistics data,
- 2:06:22the greatest project management oriented
- 2:06:24employment growth is expected to take
- 2:06:26place in software development.
- 2:06:29In this video, you learned that possible
- 2:06:32positions in project management include
- 2:06:34working as an assistant project manager,
- 2:06:36project coordinator, project manager,
- 2:06:38scrum master, project team lead, senior
- 2:06:41project manager, or director of program
- 2:06:43management. Project management is a
- 2:06:46growing field and many more jobs open up
- 2:06:48every year. Project managementoriented
- 2:06:51employment is lucrative, particularly as
- 2:06:54entire industries become more and more
- 2:06:56projectoriented.
- 2:07:02[Music]
- 2:07:09Welcome to project management across
- 2:07:12industries. After watching this video,
- 2:07:14you will be able to explain the
- 2:07:17importance of project management in
- 2:07:18various industries. Describe what a
- 2:07:21project manager requires to succeed in
- 2:07:23an industry. Some of the industries that
- 2:07:25usually require project management
- 2:07:27professionals include construction,
- 2:07:29engineering, information technology,
- 2:07:32finance, healthcare, manufacturing.
- 2:07:36Let's first try to understand the
- 2:07:38importance of project managers in the
- 2:07:39construction industry. Despite the
- 2:07:42increase in demand, concerns like rising
- 2:07:44prices and regulations make it difficult
- 2:07:46to make profits in this industry. This
- 2:07:48is where project managers become
- 2:07:49valuable. For various projects such as
- 2:07:52residential buildings, commercial
- 2:07:54properties or industrial facilities,
- 2:07:56project managers need to effectively
- 2:07:58coordinate with multiple stakeholders
- 2:08:00and resources such as architects,
- 2:08:02engineers, city planners, public work
- 2:08:04employees, and construction crews.
- 2:08:07Project manager involvement keeps the
- 2:08:09construction of buildings and facilities
- 2:08:11on track. From budgeting and schedule
- 2:08:13development to managing day-to-day
- 2:08:14activities throughout the project life
- 2:08:16cycle. Apart from quality management,
- 2:08:19contract administration and risk
- 2:08:21management are important aspects of
- 2:08:22their job. Let's explore the
- 2:08:24significance of project managers in the
- 2:08:26engineering industry. Engineering
- 2:08:29projects ranging from mechanical, civil,
- 2:08:31industrial, aerospace, chemical,
- 2:08:33biomedical, electrical, nuclear,
- 2:08:35agricultural, and marine engineering
- 2:08:37projects all require project managers.
- 2:08:40Engineering projects require careful
- 2:08:42planning and communication of the plan
- 2:08:44to their teams. Project managers in
- 2:08:46engineering must have a bachelor's
- 2:08:48degree or in some cases even a master's
- 2:08:51degree in the specific engineering field
- 2:08:53of interest as well as project
- 2:08:55management knowledge and skills such as
- 2:08:57risk management, process integration,
- 2:09:00quality assurance and procurement. The
- 2:09:02IT sector includes industries related to
- 2:09:05hardware, semiconductor, and internet
- 2:09:07service providers, also called ISPs, as
- 2:09:10well as those involving software
- 2:09:12application development, technological
- 2:09:14upgrades, computer and network
- 2:09:16infrastructures, equipment installation,
- 2:09:18and cyber security. With such a wide
- 2:09:21range of options, IT project managers
- 2:09:24must know the fundamental and conceptual
- 2:09:26technical knowledge related to networks,
- 2:09:28hardware, software life cycle, and cyber
- 2:09:31security. They need to know terminology
- 2:09:33commonly used by developers to
- 2:09:35communicate with them effectively. They
- 2:09:37also need business acumen to understand
- 2:09:39project planning, cost, and feasibility.
- 2:09:42Efficient finance project managers are
- 2:09:44required in the finance industry to
- 2:09:46enhance productivity and reduce costs.
- 2:09:49They oversee a company's financial
- 2:09:51project planning, modifications to
- 2:09:52financial systems, and implementation of
- 2:09:55technological advances. They need to be
- 2:09:58proficient in financial analysis,
- 2:09:59budgeting, and forecasting. While
- 2:10:02finance project managers manage cash
- 2:10:03flow for payroll, and project related
- 2:10:05expenses, many also develop revenue
- 2:10:08boosting strategies. Financial reporting
- 2:10:10is critical to their job as they work
- 2:10:12closely with top executives and their
- 2:10:14influential people in an organization.
- 2:10:17The stakes are high with project
- 2:10:18management in healthcare, but quality
- 2:10:20project management can improve the
- 2:10:22quality of patient care. Not only does
- 2:10:24project management need to facilitate
- 2:10:26lower costs and improved outcomes, but
- 2:10:28patient care is also a major factor.
- 2:10:32Healthcare project managers are
- 2:10:33necessary not only for hospitals and
- 2:10:35clinics, but also for pharmaceutical and
- 2:10:38medical device manufacturers.
- 2:10:40Some potential projects handled by
- 2:10:42healthcare project managers include
- 2:10:44development of web apps and portals,
- 2:10:46facilitation of the construction of new
- 2:10:49hospital buildings, departments, and
- 2:10:51implementation and integration of new
- 2:10:53equipment in a facility.
- 2:10:56To meet such needs, specialized field
- 2:10:58knowledge is required. Regulation is a
- 2:11:01big consideration while managing
- 2:11:02healthcare related projects. A degree in
- 2:11:05health management, public health, or any
- 2:11:08related studies is often beneficial. In
- 2:11:10the case of the manufacturing sector,
- 2:11:13project management is needed when an
- 2:11:14existing process changes or the need for
- 2:11:17a new process arises.
- 2:11:19When it comes to manufacturing, project
- 2:11:21managers must keep risks, hazards, and
- 2:11:24safety issues in mind. Unique skills
- 2:11:26that project managers in this sector
- 2:11:28must have include vendor account
- 2:11:30management, vendor and relationship
- 2:11:32management, and streamlining production
- 2:11:34processes. In this video, you learned
- 2:11:37that construction project managers
- 2:11:40effectively coordinate with stakeholders
- 2:11:41and resources while managing day-to-day
- 2:11:44activities throughout the life cycle of
- 2:11:45a project. In the engineering industry,
- 2:11:49project managers often need a degree in
- 2:11:51the specific field as well as project
- 2:11:53management knowledge and skills. To
- 2:11:55manage projects in the IT industry,
- 2:11:58project managers need both technical
- 2:12:00knowledge and business acumen. Finance
- 2:12:03project managers need proficiency in
- 2:12:04financial analysis, budgeting, and
- 2:12:06forecasting.
- 2:12:08Project management in the healthcare
- 2:12:10industry is high stakes because quality
- 2:12:12patient care is paramount.
- 2:12:15In the manufacturing industry, project
- 2:12:17management is needed for changes to
- 2:12:19existing processes or implementing a new
- 2:12:22process.
- 2:12:23[Music]
- 2:12:34Welcome to IT project management.
- 2:12:37After watching this video, you will be
- 2:12:39able to describe the opportunities and
- 2:12:41demand for IT project managers.
- 2:12:44Summarize the responsibilities of IT
- 2:12:46project managers. Explain the
- 2:12:48specialized skills required for IT
- 2:12:50project managers.
- 2:12:52Information technology, commonly known
- 2:12:54as IT project management, is a promising
- 2:12:57field. Recent surveys have found that
- 2:13:00there will soon be over 800,000
- 2:13:02projected employees in IT project
- 2:13:05manager positions.
- 2:13:0725% of all IT job descriptions call for
- 2:13:10IT project management skills and that
- 2:13:12there was a 50% increase in demand for
- 2:13:15IT project managers from 2021 to 2022.
- 2:13:19Information technology has the most
- 2:13:21project managers compared to other
- 2:13:23industries and tends to have higher
- 2:13:25average salaries than other fields. It
- 2:13:27is no surprise that becoming an IT
- 2:13:29project manager is a popular choice for
- 2:13:31PMs.
- 2:13:33An IT project manager is a project
- 2:13:35manager in the information technology
- 2:13:37industry. The projects they are expected
- 2:13:39to manage might be initiatives to create
- 2:13:42new products or improve and expand
- 2:13:44existing technology and systems. The
- 2:13:46role of the IT project manager, like any
- 2:13:49other project manager, is to manage the
- 2:13:51project's budget and schedules and lead
- 2:13:53project teams. An IT project manager has
- 2:13:56many responsibilities, many of which
- 2:13:58overlap with the responsibilities of a
- 2:14:00nonIT project manager.
- 2:14:02The primary responsibilities of an IT
- 2:14:04project manager include managing
- 2:14:07multiple small to medium-sized projects
- 2:14:09throughout the project life cycle,
- 2:14:11establishing a clear project definition,
- 2:14:14scope, goals, and deliverables with
- 2:14:17support from the project management
- 2:14:18team. working within deadlines and
- 2:14:21budgets, monitoring progress, organizing
- 2:14:24meetings, and creating status reports.
- 2:14:27identifying gaps following the team's
- 2:14:29project governance structure and
- 2:14:31optimizing the project and process and
- 2:14:34may involve managing testing programs
- 2:14:35like beta software releases.
- 2:14:38Implementing strategies that deliver
- 2:14:39projects on schedule and within budget
- 2:14:42managing resources for projects such as
- 2:14:44computer equipment and employees.
- 2:14:47Communicating with stakeholders such as
- 2:14:49IT managers, project personnel, vendors,
- 2:14:52and end users regarding project
- 2:14:54requirements.
- 2:14:55In addition, IT project managers are
- 2:14:58also expected to have some specialized
- 2:15:00skills. For instance, they should be
- 2:15:02familiar with various concepts and
- 2:15:04practices such as the software
- 2:15:06development life cycle or SDLC.
- 2:15:10The SDLC is a structured process that
- 2:15:12enables the production of highquality
- 2:15:14lowcost software in the shortest
- 2:15:16possible production time. An IT project
- 2:15:19manager should be familiar with the SDLC
- 2:15:22stages of planning, analysis, design,
- 2:15:25development, testing, implementation,
- 2:15:28and maintenance. They should also be
- 2:15:30familiar with software engineering
- 2:15:31fundamentals, including object-oriented
- 2:15:34analysis and design or OAD, a method to
- 2:15:37analyze and design an application
- 2:15:40through an object-oriented approach and
- 2:15:42the testing process. Additionally, they
- 2:15:45should be able to work with agile
- 2:15:46methodology and frameworks such as scrum
- 2:15:49or condone. They should also be familiar
- 2:15:52with the waterfall methodology which
- 2:15:54breaks project activities down into
- 2:15:56linear and sequential phases. Another
- 2:15:58important skill is knowledge of
- 2:16:00information system security. IT project
- 2:16:03managers will be expected to assist in
- 2:16:05establishing safe practices and system
- 2:16:07configurations in order to protect
- 2:16:09information systems from unwanted access
- 2:16:11or destruction. They should also have a
- 2:16:14working knowledge of information system
- 2:16:16security standards and practices such as
- 2:16:18access control, system hardening, system
- 2:16:20auditing, log file monitoring, security
- 2:16:23policies, and incident handling.
- 2:16:26IT project managers should also have a
- 2:16:29conceptual understanding of API
- 2:16:31integrations, the connection of two
- 2:16:33application programming interfaces and
- 2:16:35DevOps, a set of practices, tools, and
- 2:16:38philosophies that bring together IT
- 2:16:40operations and software development to
- 2:16:42more quickly produce new software.
- 2:16:45Another valuable skill is incident
- 2:16:46management. IT project managers will
- 2:16:49have to respond to unplanned events or
- 2:16:51service interruptions and be able to
- 2:16:53restore the service to an operational
- 2:16:55state.
- 2:16:56They should also be familiar with IT
- 2:16:58management or the monitoring and
- 2:17:00administrating of an organization's IT
- 2:17:02systems. This includes understanding the
- 2:17:05organization's hardware, software, and
- 2:17:07networks as well as how to make them run
- 2:17:10more efficiently.
- 2:17:12Finally, IT project managers may also be
- 2:17:15responsible for quality management or
- 2:17:18ensuring that the quality of an
- 2:17:19organization's product or service is
- 2:17:21consistent. This could involve tasks in
- 2:17:23quality planning, quality assurance,
- 2:17:26quality control, and quality
- 2:17:28improvement.
- 2:17:29As you can see, there are many skills
- 2:17:31and responsibilities that are unique to
- 2:17:33IT project managers, as well as those
- 2:17:36shared across the different types of
- 2:17:37project managers.
- 2:17:39In this video, you learned that IT
- 2:17:42project management is a growing field
- 2:17:44with a projected 30,000 jobs to open up
- 2:17:47in the next 10 years. Job openings are
- 2:17:50expected to grow at a higher rate than
- 2:17:52average. In addition to the usual
- 2:17:54responsibilities, it requires unique
- 2:17:56responsibilities such as implementing IT
- 2:17:58strategy, managing IT resources, and
- 2:18:01communicating with IT managers,
- 2:18:03employees, and clients.
- 2:18:06Other requirements include technical
- 2:18:08skills, familiarity with concepts like
- 2:18:10SDLC, OAD, API integrations and DevOps,
- 2:18:15the ability to work with agile and
- 2:18:17waterfall methodologies and IT relevant
- 2:18:20knowledge including information system
- 2:18:22security, incident management, IT
- 2:18:24management and quality management.
- 2:18:31[Music]
- 2:18:37Welcome to expert viewpoints industry
- 2:18:40specific skills. In this video we will
- 2:18:42hear from project managers discussing
- 2:18:44which project management skills are
- 2:18:46transferable and which are unique
- 2:18:48between industries.
- 2:18:50The great thing about project management
- 2:18:52is you can easily change your skills
- 2:18:55from one industry over to another. It's
- 2:18:58very similar. The biggest impact I would
- 2:19:01say, especially if you're new, you just
- 2:19:03need to know how to make those changes
- 2:19:05from one company to another. So for
- 2:19:07example, company A that I worked at
- 2:19:09before, we used a lot of waterfall
- 2:19:11methodologies versus now I have to use
- 2:19:14many different types. So I had to make
- 2:19:16that adjustment when I first made that
- 2:19:17change. I really truly feel as a project
- 2:19:20manager, you can go from telecom, for
- 2:19:23example, over to security without having
- 2:19:26to make a whole lot of adjustments.
- 2:19:28Sometimes we just have to relearn.
- 2:19:31>> What I have found is your your your soft
- 2:19:34skills translate perfectly between
- 2:19:36industries. You know, being good with
- 2:19:39people, uh, being able to be that
- 2:19:43diplomat that's able to motivate people
- 2:19:46to figure out what's going wrong and how
- 2:19:49to fix it. Those are all very important
- 2:19:51and translate well. uh besides that your
- 2:19:55obvious skills just knowing the software
- 2:19:57Jiraa Smart Sheets Microsoft Project
- 2:20:01whatever you're doing being uh
- 2:20:03well-versed in all of those things being
- 2:20:06detailed oriented uh understanding
- 2:20:09scheduling all of those things translate
- 2:20:11well I think that doesn't translate is
- 2:20:15you know the specific information about
- 2:20:18an industry
- 2:20:19>> things like being detail oriented that's
- 2:20:22something that you know is useful
- 2:20:24whether you are a finance professional,
- 2:20:28whether you're a teacher, um a writer,
- 2:20:33anything really. Uh being detail
- 2:20:35oriented is a is a skill that can be
- 2:20:38transferred.
- 2:20:39Um organization and kind of having that
- 2:20:42mindset where you can take a complex
- 2:20:44problem and break it down into smaller
- 2:20:46parts. That's a skill set that can be
- 2:20:50transferred between many industries. The
- 2:20:52skills that overlap in project
- 2:20:54management across different industries
- 2:20:57are the problem solving, creative
- 2:20:59thinking, communication skills. You need
- 2:21:02that across the board. And the skills
- 2:21:04that are really specific to my industry
- 2:21:06are un understanding the nuances of
- 2:21:09online learning and the different roles
- 2:21:11that touch the the different pieces of
- 2:21:13online learning courses. So that means
- 2:21:16specifically working with instructional
- 2:21:18designers, people who work in graphics,
- 2:21:20those who work on the support end for
- 2:21:22teacher, for teachers, for faculty, for
- 2:21:26every different person that's going to
- 2:21:27interact with the course. So that's
- 2:21:29what's really specific to my industry is
- 2:21:31having those different roles that are
- 2:21:33specific to online learning.
- 2:21:35>> Let me share with you some of the key
- 2:21:37skills that a project manager is
- 2:21:39recommended to try to attain. A project
- 2:21:43manager needs to be a good motivator, a
- 2:21:46good negotiator, a good conflict
- 2:21:48manager, a good coach, a good
- 2:21:51influencer, a good decision maker, a
- 2:21:54good team builder, and also a good
- 2:21:57project manager needs to be aware of all
- 2:22:00of the different cultures that he or she
- 2:22:02is dealing with. If you are a project
- 2:22:05manager, a process manager, a product
- 2:22:07owner, regardless of the position in
- 2:22:10management that you're in, those skills
- 2:22:12required to be an effective project
- 2:22:14manager are similar to the skills
- 2:22:16required for success in any management
- 2:22:20position. If there is one skill that is
- 2:22:22unique to project management, it is
- 2:22:25understanding the particular life cycle
- 2:22:28and following that particular life cycle
- 2:22:30and process. A traditional project goes
- 2:22:33through five phases. Initiating,
- 2:22:35planning, executing, monitoring,
- 2:22:37controlling, and closing. These life
- 2:22:40cycles are very specific to project
- 2:22:44management. And this is something that
- 2:22:46the project manager needs to be aware
- 2:22:48of. If you follow the process, you have
- 2:22:51a great chance of being successful.
- 2:22:53[Music]
- 2:23:04Welcome to path to becoming a project
- 2:23:06manager. After watching this video, you
- 2:23:10will be able to compare and contrast
- 2:23:12formal and informal project management
- 2:23:14training. Identify common project
- 2:23:16management certifications and their
- 2:23:19requirements. Discuss different ways to
- 2:23:21gain experience in project management.
- 2:23:24Qualified project managers are required
- 2:23:26in almost every industry more than ever
- 2:23:28before. The role of a project manager
- 2:23:30can be enriching. However, before you
- 2:23:33begin your career path as a project
- 2:23:35manager, you need to understand what
- 2:23:37qualifications are required to be
- 2:23:39successful in this role. Some important
- 2:23:42qualifications are training,
- 2:23:44certifications, and experience.
- 2:23:47While many jobs require an undergraduate
- 2:23:50degree, and a degree may help you
- 2:23:52qualify for more job options, there are
- 2:23:54still several jobs that hire without a
- 2:23:56degree. And while project management
- 2:23:59training is not always a requirement for
- 2:24:01qualification, some amount of training
- 2:24:03is generally recommended. There are two
- 2:24:06forms of training that people can take
- 2:24:07who aspire to become project managers,
- 2:24:10formal and informal. You can receive
- 2:24:12formal project management training at an
- 2:24:14institution while getting a degree.
- 2:24:17While there are not many colleges that
- 2:24:18offer project management degrees, many
- 2:24:21colleges offer project management
- 2:24:22certificates that you can earn while
- 2:24:24getting your degree or after you
- 2:24:26graduate. These certificate programs
- 2:24:28offer in-person or online courses in
- 2:24:31project initiation, detailed project
- 2:24:33planning, risk management, and more. For
- 2:24:36those that require greater flexibility
- 2:24:38in their schedules, there are also
- 2:24:40informal training opportunities. There
- 2:24:42are many self-paced online learning
- 2:24:44courses such as this one as well as many
- 2:24:47professional certificates from companies
- 2:24:49like IBM, Google, and Microsoft. The
- 2:24:52Project Management Institute also offers
- 2:24:55self-paced courses. Many project
- 2:24:57management professionals start their
- 2:24:59careers in non-p project management
- 2:25:01roles. Occasionally, organizations will
- 2:25:04provide project management training
- 2:25:05inhouse with professional development
- 2:25:07courses and training programs. These
- 2:25:10organizations guide and mentor the
- 2:25:12candidates to become project managers.
- 2:25:14Your manager may also know of
- 2:25:16opportunities within the organization to
- 2:25:18gain project management skills and
- 2:25:20experience. Certifications are the
- 2:25:23process by which you prove that you have
- 2:25:24the knowledge, skills, and experience to
- 2:25:27perform in a project management role.
- 2:25:29The following certifications are
- 2:25:31developed and administrated by project
- 2:25:33management bodies such as the project
- 2:25:35management institute or PMI, scrum
- 2:25:37alliance, compia, and the global academy
- 2:25:41of project management or GAPM. Obtaining
- 2:25:44a certification in project management or
- 2:25:46a relevant field is an excellent way to
- 2:25:49gain technical knowledge and
- 2:25:50credibility. Most certifications provide
- 2:25:53insight into the role and industry as
- 2:25:55well as hands-on learning and
- 2:25:57experience. Plus, they quickly show
- 2:26:00potential employers the experience and
- 2:26:02skills you have in project management.
- 2:26:04In addition to project management
- 2:26:06certifications, some employers in
- 2:26:08specific industries will also favor
- 2:26:10candidates with other industry related
- 2:26:12certifications as well. For example, an
- 2:26:15IT project manager could benefit from
- 2:26:17both a project management certificate
- 2:26:19and a compia ITF plus certification or
- 2:26:23perhaps even an A+ certificate. A PM in
- 2:26:27the construction industry might need
- 2:26:29both a project management certificate
- 2:26:31and an associate constructor certificate
- 2:26:33from the American Institute of
- 2:26:34Constructors. There are many project
- 2:26:36management certifications that are
- 2:26:38available, but here are a few common
- 2:26:40certifications to explore. Many
- 2:26:42entry-level project managers begin with
- 2:26:45a CAPM certification. The certified
- 2:26:48associate and project management
- 2:26:49certificate administered by the project
- 2:26:51management institute is a starting point
- 2:26:54for anyone interested in a project
- 2:26:56coordinator or project associate role.
- 2:26:58To qualify to take the CAPM, you must
- 2:27:01have a secondary degree such as a high
- 2:27:03school diploma, GED or equivalent and
- 2:27:06have at least 23 hours of project
- 2:27:08management education. After getting CAPM
- 2:27:11certified, many people go on to get the
- 2:27:14project management professional called
- 2:27:16the PMP certification. The PMP
- 2:27:19certification requires a secondary or
- 2:27:214-year degree, either 36 or 60 months of
- 2:27:24experience leading projects and at least
- 2:27:2635 hours of project management education
- 2:27:29or a CAPM certification. Common project
- 2:27:33management certifications in agile
- 2:27:34project management include certified
- 2:27:37scrum master or CSM through the scrum
- 2:27:40alliance. To become a certified scrum
- 2:27:42master, you must complete a CSM course
- 2:27:45and pass the CSM test. You can also get
- 2:27:49a professional scrum master or PSM
- 2:27:51certification through scrum.org.
- 2:27:54There are no requirements to take the
- 2:27:56PSM certification assessment, but you
- 2:27:58may find it useful to review the scrum
- 2:28:00guide and practice assessment provided
- 2:28:02by scrum.org. Finally, if you are
- 2:28:05interested in a career in IT project
- 2:28:07management, it may be useful to get a
- 2:28:09comp TIA A+ certification. The Computing
- 2:28:12Technology Industry Association or Comp
- 2:28:15TIA provides this certification to
- 2:28:17display knowledge in IT support tasks
- 2:28:20such as troubleshooting, identifying and
- 2:28:22configuring hardware and software
- 2:28:24troubleshooting.
- 2:28:269 to 12 months of experience is
- 2:28:28recommended but not required to take the
- 2:28:30certification exams. Lastly, the most
- 2:28:33important qualification a person can
- 2:28:35have is experience. But how does one get
- 2:28:37experience for your first job? One way
- 2:28:40to gain experience is by turning a
- 2:28:42personal goal, like planting a garden or
- 2:28:44writing a book, into a project. Use
- 2:28:47project management methods and tools to
- 2:28:49manage your project and reach your goal.
- 2:28:52Another way to gain experience is by
- 2:28:53volunteering. Many nonprofit
- 2:28:56organizations have projects they need to
- 2:28:57lead. This can give you an opportunity
- 2:29:00to gain exposure to new projects and
- 2:29:02learn about leadership management. You
- 2:29:04may find that you can get an
- 2:29:05apprenticeship, internship, or co-op.
- 2:29:08These roles are often designed as
- 2:29:10partnerships between community
- 2:29:12organizations, colleges, students, and
- 2:29:15corporate employers. In these types of
- 2:29:17programs, you can get on the job
- 2:29:19training and mentoring while you work
- 2:29:21and explore specific careers and
- 2:29:23industries. Finally, you can see about
- 2:29:26co-leading a project or shadowing a
- 2:29:28project manager in your current industry
- 2:29:30or school. Learning experiences such as
- 2:29:33these boost your confidence and prepare
- 2:29:35you for more responsible roles. In this
- 2:29:38video, you learned many colleges offer
- 2:29:40project management certificates that you
- 2:29:42can receive while you are getting your
- 2:29:44degree. Informal training opportunities
- 2:29:46are available through self-paced courses
- 2:29:48for those that require more flexibility
- 2:29:50with schedules. Certifications are the
- 2:29:53process by which you prove that you have
- 2:29:54the knowledge, skills, and experience to
- 2:29:57perform in a project management role.
- 2:29:59Common certifications for project
- 2:30:01management include the CAPM, PMP, CSM,
- 2:30:06and PSM. You can get experience for your
- 2:30:09first role in project management through
- 2:30:10a number of ways, including managing
- 2:30:13personal projects, volunteering, co-ops,
- 2:30:16internships, and shadowing or co-leading
- 2:30:19a project in your current role.
- 2:30:26[Music]
- 2:30:32Welcome to career progression in project
- 2:30:34management. After watching this video,
- 2:30:37you will be able to outline the various
- 2:30:40career paths available to project
- 2:30:42management professionals. Describe the
- 2:30:44roles and responsibilities in each
- 2:30:46position.
- 2:30:48Project management professionals can
- 2:30:50pursue a variety of career paths.
- 2:30:52Project managers may progress from
- 2:30:54entry- level roles to more senior roles.
- 2:30:56They can eventually progress to senior
- 2:30:58executive level roles. Let's explore the
- 2:31:01career progression from an entry-le
- 2:31:03project coordinator to more senior roles
- 2:31:05such as a VP of operations. While most
- 2:31:08careers do not follow a straightforward
- 2:31:10linear path, the typical role
- 2:31:12progression in an organization would be
- 2:31:15beginning a career as a project
- 2:31:17coordinator, then becoming a project
- 2:31:19manager, then a promotion to senior
- 2:31:21project manager. After years of
- 2:31:23experience managing individual projects
- 2:31:25with complex parts, a senior project
- 2:31:28manager may move into the role of
- 2:31:30program manager and then portfolio
- 2:31:32manager. Some program and portfolio
- 2:31:34managers who lead many successful
- 2:31:36projects may attain roles such as
- 2:31:39director of project management or VP of
- 2:31:41operations.
- 2:31:43Those interested in a career in project
- 2:31:45management may start as an entry-level
- 2:31:48project coordinator. This is an
- 2:31:49administrative position in charge of the
- 2:31:51generation and distribution of project
- 2:31:53reports and often also deals with
- 2:31:56scheduling. A project coordinator is a
- 2:31:58member of the project management team
- 2:32:00who assists with the project. Project
- 2:32:03coordinators will attend meetings and
- 2:32:05assist on minor aspects of the project.
- 2:32:08Meet with the project team regularly to
- 2:32:10report on progress and discuss any
- 2:32:11potential roadblocks. Prepare meeting
- 2:32:14agendas and notes and maintain project
- 2:32:16and meeting schedules.
- 2:32:18After some time as a project
- 2:32:20coordinator, you can progress to a
- 2:32:22project manager. A project manager is an
- 2:32:24entry or mid-level role who uses
- 2:32:27appropriate tools, techniques, and
- 2:32:29processes to complete a project
- 2:32:30successfully. A project manager is
- 2:32:33responsible for balancing resource
- 2:32:35availability with resource requirement,
- 2:32:38working within project constraints that
- 2:32:39include budget, scope, and schedule, and
- 2:32:43meeting and managing key stakeholders
- 2:32:45expectations related to quality
- 2:32:47standards.
- 2:32:48Experienced project managers can then
- 2:32:50become senior project managers. A senior
- 2:32:53project manager is often also a member
- 2:32:55of a large management team. A senior
- 2:32:58project manager may be in charge of
- 2:33:00projects that have a broader scope or
- 2:33:02are more complex. They may also oversee
- 2:33:05multiple projects and must determine
- 2:33:07which projects and tasks need to be
- 2:33:09prioritized.
- 2:33:10After gaining a rich experience of
- 2:33:12working at the project level in an
- 2:33:14organization, a project management
- 2:33:16professional can advance to the role of
- 2:33:18program management. A program is a
- 2:33:20collection of projects managed together
- 2:33:22to reap benefits that would not be
- 2:33:24possible had they been managed
- 2:33:25individually. Program management
- 2:33:27involves greater responsibility as it
- 2:33:29requires overseeing multiple
- 2:33:31simultaneous projects that are dependent
- 2:33:33on one another. To succeed, a program
- 2:33:36manager must develop program level
- 2:33:39plans, strategically manage several
- 2:33:41projects, analyze the business benefits
- 2:33:44of a program, and manage project
- 2:33:46dependencies.
- 2:33:48As someone continues to progress in
- 2:33:50their career, they advance into a senior
- 2:33:52role and may become a portfolio manager.
- 2:33:55This position carries a great deal of
- 2:33:56responsibility and hence requires rich
- 2:33:59experience and expertise. A portfolio
- 2:34:02manager is responsible for a group of
- 2:34:04projects and programs managed together
- 2:34:06to achieve strategic business goals.
- 2:34:09Hence, a portfolio manager is in charge
- 2:34:11of the centralized management of one or
- 2:34:13more portfolios to achieve the goals of
- 2:34:16an organization.
- 2:34:17Very experienced project management
- 2:34:19professionals can attain senior and
- 2:34:21executive level positions such as
- 2:34:23director of the project management
- 2:34:25office, PMO, and vice president of
- 2:34:27operations. The director of project
- 2:34:29management is a senior management level
- 2:34:31position that requires five or more
- 2:34:33years of managerial experience plus
- 2:34:36project management experience. They
- 2:34:38oversee other senior level project and
- 2:34:41portfolio managers. They are also
- 2:34:43responsible for guiding, instructing and
- 2:34:46developing project management operations
- 2:34:48and structuring processes and workflows.
- 2:34:50They ensure overall project governance
- 2:34:52by establishing project delivery
- 2:34:54standards, protocols and tools. The vice
- 2:34:57president of operations is an executive
- 2:34:59level position that requires 10 years of
- 2:35:02industry experience. The vice president
- 2:35:04is accountable for developing and
- 2:35:06implementing efficient and
- 2:35:07cost-effective operations that drive the
- 2:35:09current and future goals of the
- 2:35:11organization.
- 2:35:12They are responsible for operating,
- 2:35:14managing, planning, and coordinating the
- 2:35:17overall operations of an organization.
- 2:35:19They ensure operations run smoothly by
- 2:35:21setting a strategic operational vision
- 2:35:23and enforcing an organization's policies
- 2:35:26and procedures.
- 2:35:28In this video, you learned that a
- 2:35:31project coordinator is an entry-level
- 2:35:33administrative position responsible for
- 2:35:35creating and distributing project
- 2:35:36reports. A project manager is
- 2:35:39responsible for managing the necessary
- 2:35:41tools, techniques, and processes to
- 2:35:43successfully complete a project. A
- 2:35:46senior project manager oversees multiple
- 2:35:48projects and decides which needs to be
- 2:35:50prioritized. A program manager oversees
- 2:35:53multiple projects, analyzes business
- 2:35:55benefits, manages project dependencies,
- 2:35:57and develops program level plans. A
- 2:36:00portfolio manager supervises the
- 2:36:02centralized management of one or more
- 2:36:04portfolios to achieve organizational
- 2:36:06goals.
- 2:36:07The director of project management
- 2:36:09guides, instructs, and develops project
- 2:36:11management operations, structures the
- 2:36:13workflow, and ensures overall project
- 2:36:16governance. The vice president of
- 2:36:18operations is in charge of operating,
- 2:36:21managing, planning, and coordinating a
- 2:36:23project's overall operations.
- 2:36:30[Music]
- 2:36:35Welcome to expert viewpoints. Describe
- 2:36:38your career path. In this video, we will
- 2:36:41hear from project managers discussing
- 2:36:42the path they took to their current
- 2:36:44careers.
- 2:36:46>> So, for about a 20-year period, I was a
- 2:36:48project manager in the United States Air
- 2:36:50Force. I retired from the Air Force and
- 2:36:53immediately found some consulting jobs
- 2:36:56in project management. So in 2003 I
- 2:36:59received my project management
- 2:37:01professional certification from the
- 2:37:02project management institute. I do have
- 2:37:05multiple certifications and I enjoy
- 2:37:10using those certifications for a more
- 2:37:13important reason that is teaching. As I
- 2:37:16had mentioned earlier, I teach at four
- 2:37:19different universities and the one thing
- 2:37:21that I have found is that if you teach,
- 2:37:25you really have to learn what you are
- 2:37:28teaching and that has really helped me
- 2:37:31in my path to get to the point where I
- 2:37:33can be a subject matter expert today.
- 2:37:36>> I ended up finding a startup that was
- 2:37:38working on online learning for adults
- 2:37:41and I stayed at that startup because I
- 2:37:43really liked the work environment. that
- 2:37:44startup became a public company and I
- 2:37:47just really liked the fast-paced
- 2:37:49environment and in that company I was
- 2:37:51actually a producer for a while and that
- 2:37:54meant that I was constantly thinking on
- 2:37:56my feet on set filming several different
- 2:37:59professors at once for their online
- 2:38:00learning courses and it meant filming
- 2:38:03interviews, roundt discussions,
- 2:38:07vignettes and doing really cool things
- 2:38:09even with actors and all of that was
- 2:38:11across several different types of a
- 2:38:14field. So I worked in production for an
- 2:38:18online physical therapy degree which was
- 2:38:21I learned so much so much there. I
- 2:38:23worked in online learning for cyber
- 2:38:25security at at Berkeley and data science
- 2:38:27at Berkeley and nursing programs one um
- 2:38:31nursing programs programs at
- 2:38:32Northwestern and and several more. And I
- 2:38:35really just enjoyed
- 2:38:37all of the connections I would make with
- 2:38:39people and which was actually the most
- 2:38:41important part for me. So even though I
- 2:38:43was managing production pieces of that,
- 2:38:45I really like the connections I was
- 2:38:48making um with these different folks to
- 2:38:51create life into these projects. And
- 2:38:53that evolved into me working across even
- 2:38:56more projects and then learning more
- 2:38:59about project management and continuing
- 2:39:01to use those skills of thinking on my
- 2:39:03feet, being creative, loving
- 2:39:05relationships. And that's how I got
- 2:39:07here.
- 2:39:09My career path. In 2010, I started
- 2:39:12working at a local call center for a
- 2:39:14very large telecom company taking in
- 2:39:16billing calls. So, I started out only
- 2:39:18$10 an hour. But I know I needed to get
- 2:39:21my foot in the door in it and start
- 2:39:23learning from others. From there, I
- 2:39:25worked very hard and became an
- 2:39:27operations manager for the enterprise
- 2:39:29section.
- 2:39:30After that point, I moved on to their
- 2:39:32NetApp department and became a P1 duty
- 2:39:36manager. I knew that I really needed to
- 2:39:38grow on my education and learn a lot
- 2:39:40more in order to pursue anything else in
- 2:39:43it. From there, I went over to
- 2:39:46University of Central Florida, took a
- 2:39:48lot of classes in project management,
- 2:39:50HR, marketing, pretty much you name it.
- 2:39:53I tried to do everything I could to see
- 2:39:55where I wanted to go. When I took the
- 2:39:57project management course, I knew that
- 2:39:59was definitely the direction I wanted.
- 2:40:01I'm very detail oriented and organized,
- 2:40:04and I just love projects. I got very
- 2:40:06excited. We got to do our own in class
- 2:40:08as well. From there, I moved over to a
- 2:40:11company called Audio Codes. I was a
- 2:40:13project manager. I took on quite a bit
- 2:40:15of projects and I started mentoring
- 2:40:17others. I wanted to pursue even more
- 2:40:20within that company and I worked very
- 2:40:23hard to teach others as much as I knew
- 2:40:26about the company itself, project
- 2:40:29management, and I was able to get
- 2:40:32promoted over to PMO director. From
- 2:40:35there, I had 12 direct reports while
- 2:40:37also managing very large projects at the
- 2:40:39same time.
- 2:40:41I then wanted to go ahead and grow my
- 2:40:44career and I moved over to Zscaler in
- 2:40:462021 as a senior project manager and
- 2:40:49currently mentoring others working very
- 2:40:52large enterprise projects for them as
- 2:40:54well.
- 2:40:56Now, my story is a little bit funny
- 2:40:58because back when I was at USC,
- 2:41:01uh, and my friends were all making like
- 2:41:03seven bucks an hour working in the
- 2:41:05library or in some office, I was making
- 2:41:0850 bucks an hour helping, uh,
- 2:41:10medium-sized businesses computerize. So,
- 2:41:13that came uh to bear with all the other
- 2:41:17things I'd been doing. So running uh
- 2:41:21running projects for college uh even in
- 2:41:24high school, you know, learning to be
- 2:41:26organized, learning to be detailed
- 2:41:29oriented, uh being a good communicator,
- 2:41:32all kind of came together
- 2:41:35later uh when I moved into what I
- 2:41:38consider kind of the upper ranks of a
- 2:41:40consulting uh project manager, it really
- 2:41:44was, you know, years of doing a lot of
- 2:41:48different projects that put me in the
- 2:41:51position to get a higher paying job as a
- 2:41:55project manager.
- 2:41:57>> So I started off as a event planner and
- 2:42:01early early in my career planning
- 2:42:03weddings and concerts and entertainment
- 2:42:07events and I got a job as a business
- 2:42:13consultant and really took an interest
- 2:42:16in project management. And so my first
- 2:42:19couple of projects I worked as a pseudo
- 2:42:24project manager. Um really taking in
- 2:42:27kind of a lot of things that I could
- 2:42:30learn about project management from the
- 2:42:34people around me and the teams around
- 2:42:36me. So I started doing project
- 2:42:41management for some of my clients. I
- 2:42:43ended up uh landing a client where I
- 2:42:46helped them move from a waterfall
- 2:42:50project management methodology to an
- 2:42:52agile project management methodology and
- 2:42:55really kind of fell in love with some of
- 2:42:56the agile frameworks and the scaled
- 2:42:59agile frameworks. And now I both manage
- 2:43:04projects as a business consultant, but
- 2:43:06also uh help organizations develop
- 2:43:10content for project management courses
- 2:43:13and and pass on the expertise that I've
- 2:43:16learned as I've, you know, worked in
- 2:43:20project management.
- 2:43:26[Music]
- 2:43:31Welcome to expert viewpoints, job
- 2:43:34hunting and career progression tips. In
- 2:43:37this video, we will hear from project
- 2:43:39managers discussing tips for job hunting
- 2:43:41and progressing as a project manager.
- 2:43:44>> Number one, find a mentor. Find someone
- 2:43:47that you can follow. Find someone who
- 2:43:49will be a coach to you. someone that you
- 2:43:52can respect, someone that you can
- 2:43:53understand, someone who has had a
- 2:43:56successful career in project management.
- 2:43:58Number two, be an active listener. You
- 2:44:02have two ears, you have two eyes, and
- 2:44:04you have one mouth. There's a reason why
- 2:44:06we have two ears. Listening will allow
- 2:44:10you to absorb more information than
- 2:44:13speaking. Find that mentor. Find that
- 2:44:16individual who has quote unquote been
- 2:44:18there and done it and listen closely. In
- 2:44:22addition, make sure that you learn from
- 2:44:25both positive and negative examples.
- 2:44:29As a project manager, you're going to
- 2:44:31see some people who just flat out do not
- 2:44:34do it well. You're going to see others
- 2:44:36who are very, very successful. Watch the
- 2:44:39people who do not do project management
- 2:44:41well. Try to determine why did they
- 2:44:44fail. Watch the people who perform
- 2:44:46project management well. Ask yourself
- 2:44:49why did they succeed. Oftentimes the
- 2:44:53positive examples are outstanding.
- 2:44:56But in reality, we oftenimes learn more
- 2:45:00from the negative examples.
- 2:45:03>> First off, start with informal
- 2:45:05interviews. Any type of job that you're
- 2:45:07thinking about going into, it's very
- 2:45:09helpful. you can understand from their
- 2:45:11point of view what it's like for their
- 2:45:13daytoday if they really truly like their
- 2:45:16career and it gives you an opportunity
- 2:45:18to learn from them. That could also be a
- 2:45:20potential for a mentorship in the
- 2:45:22future. Secondly, I would recommend
- 2:45:24studying for the PMP. Even if you don't
- 2:45:27have the hours, it's still good to know
- 2:45:29the foundations of project management
- 2:45:31and it will help you understand quite a
- 2:45:33bit more. Many places do require a
- 2:45:36bachelor's degree. So, please make sure
- 2:45:38you are at least taking the bare minimum
- 2:45:41courses like marketing, project
- 2:45:44management, finance, all of those type
- 2:45:47of classes will actually help you out in
- 2:45:49the long run as well.
- 2:45:51>> I think the number one thing is to
- 2:45:54really look at your skills and um how
- 2:45:58you are working with people. Do you
- 2:46:00enjoy working with teams? uh do you care
- 2:46:04about you know people in a way where
- 2:46:07you're going to go through both the fun
- 2:46:10and the difficult times because you will
- 2:46:13have in almost every project you know
- 2:46:16things will go wrong and it won't be
- 2:46:18easy there will be times where uh
- 2:46:21something simply fails in unexpectedly
- 2:46:24and you have to fix it uh so you have to
- 2:46:27have patience and people skills to be
- 2:46:30able to do that
- 2:46:31>> the advice that I would give someone who
- 2:46:33is trying to launch their career right
- 2:46:34now in project management is that follow
- 2:46:38the path that feels the best to you for
- 2:46:42what you want to do and specifically in
- 2:46:44the organization that you want to work
- 2:46:45with. I have a lot of education. I
- 2:46:49worked and got my masters and I got my
- 2:46:52doctorate in organizational change and
- 2:46:54leadership and that was my path because
- 2:46:56I happen to just love school. But I have
- 2:47:00had co-workers, colleagues that have far
- 2:47:02different types of education but a lot
- 2:47:05more experience specifically in project
- 2:47:08management. So there's diff there are
- 2:47:10different ways to get to where you want
- 2:47:13to be. You focus in on what is the best
- 2:47:17for you.
- 2:47:19>> What has helped you most in advancing
- 2:47:21your career?
- 2:47:22>> Surround yourself with really great
- 2:47:24people. One of the things that I will
- 2:47:26share with you is the most dangerous
- 2:47:28project manager is the individual who
- 2:47:31says, "I don't need any help. I've got
- 2:47:34this." A good project manager knows what
- 2:47:37they know, knows what they do not know,
- 2:47:39and surrounds themselves with people who
- 2:47:41know what they do not know. Project
- 2:47:43management is an individual sport in a
- 2:47:46sense. As the project manager, you are
- 2:47:49accountable for outcomes, but in
- 2:47:51reality, project management is a team
- 2:47:53sport. Surround yourself with good
- 2:47:55people, build the team, and I think
- 2:47:58you'll be very, very successful in all
- 2:48:00of your projects and in the long term
- 2:48:03advancing your career.
- 2:48:04>> Get a career coach. My career coach
- 2:48:07helped me out so much building my resume
- 2:48:09with me, understanding why it's so
- 2:48:11important to have a resume, and then
- 2:48:13even a cover letter, and then help me
- 2:48:16prep for my job interviews. They are now
- 2:48:19a long-term career coach and I greatly
- 2:48:21appreciate them because it's not just a
- 2:48:23point in time in my journey. They're
- 2:48:24helping me out with my overall journey.
- 2:48:27Secondly was my education. From the
- 2:48:29start at UCF, I was able to understand
- 2:48:32the basics of project management.
- 2:48:34However, when I went over to University
- 2:48:36of North Carolina for my MBA, I was able
- 2:48:39to build relationships with others and
- 2:48:41truly understand how to network. From
- 2:48:43there, with the education itself, I was
- 2:48:45able to bring it to the next level and
- 2:48:48pursue my career even further.
- 2:48:51>> So, what's helped me the most in
- 2:48:53advancing my career has really been the
- 2:48:57ability to
- 2:48:59look for different projects and be open
- 2:49:02for those kind of special opportunities.
- 2:49:06So when I first started working for
- 2:49:09example for a boutique firm in Chicago
- 2:49:12as a consulting project manager, you
- 2:49:15know,
- 2:49:17being recognized as somebody who's very
- 2:49:19good at fixing problems was probably one
- 2:49:23of the keys to my really advancing. So
- 2:49:27being in a position to understand that
- 2:49:29all of my different life skills from
- 2:49:31like I said being a diplomat to being
- 2:49:34highly organized and extremely good with
- 2:49:37people suddenly put me in a position to
- 2:49:39say that if there's a project that needs
- 2:49:42help, I can fix it.
- 2:49:49[Music]
- 2:49:53Welcome to this course on project
- 2:49:55management foundations initiation and
- 2:49:57planning.
- 2:49:58After completing this course, you will
- 2:50:01be able to explain project management
- 2:50:03concepts, principles, and terminology.
- 2:50:07Design effective project management
- 2:50:09templates for launching your projects.
- 2:50:11Integrate clear, understandable, and
- 2:50:14practical methods to improve project
- 2:50:16management results in real world
- 2:50:18scenarios.
- 2:50:20Use skills and tools to carry out
- 2:50:22activities required to set up and
- 2:50:23initiate a project.
- 2:50:26Describe how project management is
- 2:50:27changing in the modern era. And
- 2:50:30distinguish between various
- 2:50:32methodologies for project planning and
- 2:50:33management. The first module in this
- 2:50:36course titled why project management
- 2:50:39defines project management and the role
- 2:50:41project managers play in overseeing
- 2:50:43projects.
- 2:50:45You will learn about the skills,
- 2:50:47competencies, traits and mindset
- 2:50:49required to be a successful project
- 2:50:51manager. In module two, traditional
- 2:50:53project management, you will learn
- 2:50:55traditional methodologies as well as
- 2:50:58high-level information about the 10
- 2:50:59leading project management approaches.
- 2:51:02This module also covers project
- 2:51:04management phases or process groups,
- 2:51:07organizational types, definitions, and
- 2:51:10the role of the project management
- 2:51:11office or PMO. The third module, modern
- 2:51:15project management, introduces concepts
- 2:51:17relevant to today's world where teams
- 2:51:19are frequently dispersed globally and
- 2:51:21more collaboration tools are available.
- 2:51:23The module begins by defining modern
- 2:51:25project management, including
- 2:51:27principal-based project management, and
- 2:51:29later discusses its benefits and
- 2:51:31drawbacks. In setting up the project for
- 2:51:34success, you will learn about and
- 2:51:36practice some key tools a project
- 2:51:38manager uses to initiate a project. It
- 2:51:40involves a project charter, project
- 2:51:42brief, a responsible, accountable,
- 2:51:45consulted and informed or RACI chart,
- 2:51:49stakeholder analysis and matrix and
- 2:51:52project budget. The fifth module is
- 2:51:55project planning which introduces you to
- 2:51:57developing a project management plan.
- 2:51:59This includes end-to-end scope,
- 2:52:01schedule, and budget planning. You will
- 2:52:03learn essential project planning tools
- 2:52:06such as work breakdown structure or WBS,
- 2:52:09a project network diagram, and
- 2:52:11threepoint budget estimation. Finally,
- 2:52:14in the final project and assessment
- 2:52:16module, you will review the key
- 2:52:18takeaways of the course, complete a
- 2:52:20final project, and take the final quiz.
- 2:52:23This course uses various teaching
- 2:52:25methods, including instructional videos,
- 2:52:27discussion activities, scenario labs,
- 2:52:29and quizzes. In the guided instructional
- 2:52:32videos, a subject matter expert orme
- 2:52:36walks you through project management
- 2:52:37concepts with essential need to know
- 2:52:39facts. The discussion activities
- 2:52:41reinforce what you've learned in the
- 2:52:42course videos and encourages you to
- 2:52:44apply new knowledge and skills as you
- 2:52:46learn. In the labs, you will develop a
- 2:52:49project charter, an RACI chart, a
- 2:52:52stakeholder matrix and analysis, and a
- 2:52:54project budget. Once completed, these
- 2:52:58key tools can be added to your portfolio
- 2:53:00to demonstrate your project management
- 2:53:01skills to potential employees. Practice
- 2:53:04and graded quizzes are included in each
- 2:53:06module to assess your learning and
- 2:53:07validate the key concepts introduced.
- 2:53:11Once you have completed this course, you
- 2:53:13will receive a certificate that can be
- 2:53:14shared with prospective employers to
- 2:53:16demonstrate your knowledge of project
- 2:53:18management. Good luck and let's get
- 2:53:20started.
- 2:53:23[Music]
- 2:53:32Welcome to what inspired us to create
- 2:53:34this course. Project management can be a
- 2:53:38highly rewarding career path and the
- 2:53:40need for qualified project managers is
- 2:53:43greater than ever before across all
- 2:53:45industries. To understand this
- 2:53:47discipline, one should have a clear
- 2:53:49understanding of the responsibilities of
- 2:53:51this position. Project management
- 2:53:54entails leading a team through all the
- 2:53:56stages of a project successfully.
- 2:53:59Project managers are chiefly responsible
- 2:54:01for the planning, development, delivery,
- 2:54:04and closure of a project in a set time
- 2:54:07frame. And to accomplish the mission,
- 2:54:09project managers should be well-versed
- 2:54:12in project management tools, techniques,
- 2:54:14and processes. So to explain in greater
- 2:54:18detail and provide insights to learners,
- 2:54:20we aim to create a course that focuses
- 2:54:23on the structure of project management
- 2:54:25and its practical application in dealing
- 2:54:28with realworld scenarios. Each project
- 2:54:31has its own set of challenges. So even
- 2:54:34though you have the right tools and
- 2:54:36resources to address them, it is
- 2:54:38important for you to have the ability to
- 2:54:40deal with them. This course aims to
- 2:54:43familiarize you with how to make
- 2:54:45yourself ready for the project
- 2:54:46management role. Our dual emphasis on
- 2:54:49structure and adaptability will help you
- 2:54:52modify your approach based on the
- 2:54:53situations and the different phases of a
- 2:54:56project. We believe project management
- 2:54:59is a valuable life skill for anyone from
- 2:55:02any background. A few key skills that
- 2:55:04can benefit any professional are knowing
- 2:55:07how to track and manage a budget,
- 2:55:09knowing how to deliver things on time,
- 2:55:12and knowing how to manage and
- 2:55:14communicate with stakeholders.
- 2:55:16So, even if project management is not
- 2:55:19the primary focus of your career, the
- 2:55:21topics we cover in this course will be
- 2:55:24beneficial to achieving your career
- 2:55:26goals. In this course, we will focus on
- 2:55:29how a project begins and the skills
- 2:55:31needed to ensure its success.
- 2:55:36[Music]
- 2:55:44Welcome to how to make the most out of
- 2:55:46this course. This course is part of a
- 2:55:49series of courses intended to teach
- 2:55:51project management skills.
- 2:55:54After watching this video, you will be
- 2:55:56able to explain the concept of the
- 2:55:58rainbow path, list the certificates
- 2:56:00these courses are designed to support,
- 2:56:03and explain the best way to get the most
- 2:56:05out of this series. Now, this project
- 2:56:08management series shows the path and
- 2:56:10tools when time and resources are
- 2:56:12plenty. This is known as the rainbow
- 2:56:15path because everything is perfect in
- 2:56:17this scenario. While having an ideal
- 2:56:20project is certainly something to aspire
- 2:56:22to, it doesn't always work out that way
- 2:56:24in the real world. This series strives
- 2:56:26to take the methodology and tools one
- 2:56:29step further into how they will work in
- 2:56:31real life situations on a project.
- 2:56:34However, knowing the rainbow path is
- 2:56:36important so that you as a project
- 2:56:38manager know what steps to take to keep
- 2:56:40your projects as perfect as possible.
- 2:56:43These courses are specifically designed
- 2:56:45to help anyone seeking a PMI, PMP or
- 2:56:49project management professional
- 2:56:50certification or PMI CAPM or certified
- 2:56:54associate in project management
- 2:56:56certification from the project
- 2:56:58management institute or PMI. All the
- 2:57:01concepts, methodologies, processes and
- 2:57:03tools presented in this series are drawn
- 2:57:06from project management resources such
- 2:57:08as the PMI and our expertise. The PMI's
- 2:57:13project management body of knowledge
- 2:57:14version 7 or pinbox 7 serves as the
- 2:57:18foundation of our courses. However, some
- 2:57:20information is drawn from other models
- 2:57:22in this series. Although there is
- 2:57:25currently no experience credit
- 2:57:26associated with taking these courses,
- 2:57:29the benefit of learning about project
- 2:57:30management from different perspectives
- 2:57:32and how it can be used in real life
- 2:57:35scenarios will lay a great foundation
- 2:57:37for professionals seeking a career in
- 2:57:39project management. This can produce
- 2:57:41great results. Also, you may use these
- 2:57:45courses to show that you have completed
- 2:57:46the required contact hours to take the
- 2:57:48certification examination. To fully reap
- 2:57:52the benefits of this series, we
- 2:57:54recommend that you go through all the
- 2:57:55courses, devote time to labs and the
- 2:57:58completion of exercises to test your
- 2:58:00knowledge, and see how the learning can
- 2:58:02be applied to real life situations.
- 2:58:05Being attentive and taking notes will
- 2:58:07help you retain the knowledge you gained
- 2:58:09during this series. So pursue this
- 2:58:11series diligently like any other
- 2:58:13high-level course which will
- 2:58:15significantly help you in your next
- 2:58:17project.
- 2:58:21[Music]
- 2:58:29Welcome to expert viewpoints instructor
- 2:58:32introductions. In this video you will
- 2:58:34hear from project managers introducing
- 2:58:36themselves and their roles.
- 2:58:40Hello, my name is Katherine Brooks. I'm
- 2:58:41an engineering project manager at Tech
- 2:58:43Systems for Apple. I am my PMP and my
- 2:58:46MBA from UNC Chapel Hill. I have 12
- 2:58:49years experience.
- 2:58:51Hi, my name is Casey Kyle and I
- 2:58:54currently work developing courses as a
- 2:58:57content creator and subject matter
- 2:58:59expert. Um I've been working in the
- 2:59:03field of project management
- 2:59:06um
- 2:59:07corporate technology consulting and
- 2:59:10course creation for about the last 15
- 2:59:12years and I have certifications as a
- 2:59:17certified project manager as well as a
- 2:59:20certified scrum master and agileist.
- 2:59:24>> Hi, my name is Paul Partardi. Um I've
- 2:59:26had uh a few titles in my career. I've
- 2:59:29served as a software development manager
- 2:59:32as well as a content manager for some
- 2:59:35fairly large teams. Um, and while I've
- 2:59:38never had the role of project manager
- 2:59:40per se, I've done a lot of project
- 2:59:42management in both of my roles in my
- 2:59:44career.
- 2:59:45>> Hi, my name is Kristen Pollson and I'm
- 2:59:47the director of customer success with
- 2:59:50Skillup Technologies. I've been with
- 2:59:52Skillet for about 5 and a half years,
- 2:59:54but in the project management space for
- 2:59:57a little over 20. Throughout my 20
- 2:59:59years, I have not gotten any credentials
- 3:00:02or uh done any PMP or CPAM tests.
- 3:00:08Hi, my name is Megan Peek and I'm a
- 3:00:10senior project manager at Skillup
- 3:00:12Technologies. I have over 10 years of
- 3:00:14experience as a project manager and I
- 3:00:17have a certificate in project management
- 3:00:19for the University of Washington. Hello,
- 3:00:21my name is Matt Versdall. I am an
- 3:00:24operations manager at Harborview Medical
- 3:00:26Center in Seattle, Washington, as well
- 3:00:28as a instructor in project management
- 3:00:31for a few different colleges in the
- 3:00:32area. I have been around project
- 3:00:34management for about 12 years and
- 3:00:37managed all kinds of different projects
- 3:00:39from the automotive industry to
- 3:00:41healthcare to facilities.
- 3:00:44I'm a certified six sigma black belt
- 3:00:47certified uh project management
- 3:00:49professional.
- 3:00:51certified scrum master and I have a
- 3:00:53couple of certifications in supply chain
- 3:00:55management, the certified supply chain
- 3:00:58professional and the certified
- 3:01:01professional supply manager. My name is
- 3:01:04Daniel Yman's. I go by Dan. I'm
- 3:01:06currently employed as a subject matter
- 3:01:09expert for Skill Up Technologies. I am
- 3:01:13involved in the development of five
- 3:01:15different project management related
- 3:01:17courses to include the one that you're
- 3:01:19watching now. In terms of companies that
- 3:01:23I work for, I do have a small company
- 3:01:26called ROI Seminars and Consulting. But
- 3:01:29in addition, I'm also a facilitator, a
- 3:01:31course developer, and also a corporate
- 3:01:35trainer for Green River College, for
- 3:01:38Belleview College and South Seattle
- 3:01:40Colleges here locally in the Seattle,
- 3:01:42Washington area. And I also teach for
- 3:01:45grading undergraduate and graduate level
- 3:01:48business at Northwest University.
- 3:01:53[Music]
- 3:02:00Welcome to expert viewpoints importance
- 3:02:03of project management. In this video we
- 3:02:07will hear from project managers
- 3:02:08discussing why project management is
- 3:02:10important.
- 3:02:12So, I think that great project
- 3:02:15management really allows members of a
- 3:02:18team to focus intently on the work that
- 3:02:22needs to get done to meet the project
- 3:02:24objectives rather than spending a lot of
- 3:02:28time
- 3:02:29um trying to figure out what needs to
- 3:02:32get done or doing rework because they
- 3:02:37aren't working maybe on the right things
- 3:02:39or they don't have all the information
- 3:02:41that they need to complete the tasks
- 3:02:43that they need to get done. Um, I think
- 3:02:46very good project managers help teams
- 3:02:50anticipate and mitigate and even resolve
- 3:02:54risks and issues that come up and
- 3:02:57challenges that come up during the life
- 3:02:59cycle of the project. And then I also
- 3:03:04think that having um
- 3:03:07clear deliverables that are communicated
- 3:03:10clearly, that are defined early on in
- 3:03:13the pro uh project, they're communicated
- 3:03:16frequently. They help the team know
- 3:03:19exactly what's going on and when it
- 3:03:21needs to get done.
- 3:03:23I think project management is more
- 3:03:26important now than ever. There are so
- 3:03:28many more remote project teams than ever
- 3:03:30before. And teams are spread across
- 3:03:32multiple time zones. And while teams are
- 3:03:35physically apart, the speed of
- 3:03:37communication is happening fast through
- 3:03:39collaboration tools like Slack and
- 3:03:41Microsoft Teams. So you need that
- 3:03:43central person to track this broad and
- 3:03:46rapid communication and make sure
- 3:03:48information is getting to the right
- 3:03:50people at the right time so everyone can
- 3:03:52deliver their best quality work.
- 3:03:56Um the project manager really is the
- 3:03:59rudder that kind of steers the project
- 3:04:01ship. Um when you think about what the
- 3:04:03project manager does, they are
- 3:04:05responsible for managing the schedule,
- 3:04:07managing all the individual tasks that
- 3:04:09need to happen. They're responsible for
- 3:04:11communicating with upper management and
- 3:04:13with the team about the project status
- 3:04:15about changes in requirements. So the
- 3:04:18project manager really is that person
- 3:04:20that's responsible for making sure that
- 3:04:23the project is moving in the direction
- 3:04:24that it's supposed to be moving in.
- 3:04:26Think about a government without
- 3:04:28government officials or um a corporation
- 3:04:31without a CEO. Um the project manager
- 3:04:34really is is essential in in ensuring
- 3:04:36that the project goals are met and that
- 3:04:39the um the project meets those goals.
- 3:04:43When I think about a a project without a
- 3:04:45project manager or even projects that
- 3:04:48have poor project management, um
- 3:04:51projects end up uh you know doing
- 3:04:54similar work over and over again. They
- 3:04:56end up repeating tasks or missing
- 3:04:59schedules or deadlines. Um there's been
- 3:05:03some projects that I've been a part of
- 3:05:04that have been self-managed where the
- 3:05:06team tries to manage the tasks and
- 3:05:09schedules on their own and there's too
- 3:05:11many voices. people uh assume things are
- 3:05:13getting done when they're not getting
- 3:05:15done. People assume they know the tasks
- 3:05:17when they really don't know the tasks uh
- 3:05:19that need to be accomplished for a
- 3:05:20project. So the project manager is the
- 3:05:23individual or the team that uh takes all
- 3:05:27of the uh essentials of a project and um
- 3:05:30ensures those those essentials are being
- 3:05:33u accomplished. Those those those goals
- 3:05:35are being met.
- 3:05:38[Music]
- 3:05:45[Music]
- 3:05:48Welcome to expert viewpoints project
- 3:05:50management the journey. In this video we
- 3:05:53will hear from project managers
- 3:05:55discussing the journey and destination
- 3:05:57of project management.
- 3:06:00>> Let's begin with the destination. What
- 3:06:02is the destination? What is the ultimate
- 3:06:04goal of a project? on time, within
- 3:06:07budget, and providing scope to satisfy
- 3:06:09the customer's needs. Being able to move
- 3:06:12the bar for the organization to provide
- 3:06:15value. But it's not all about the
- 3:06:17destination. The journey is working
- 3:06:19together, building the team, gaining new
- 3:06:22skills, building new relationships. It's
- 3:06:25achieving success, not only for the
- 3:06:28organization, but for yourself. It's
- 3:06:30about, in addition, being empowered to
- 3:06:34make a difference.
- 3:06:36Within a project itself, you can think
- 3:06:38about the actual journey is going
- 3:06:40through the project. What happens at the
- 3:06:43very beginning, during the middle and
- 3:06:45then towards the end, how did you get to
- 3:06:47your destination, which is the end
- 3:06:49result. So, did you actually complete
- 3:06:52the project in time with its scope and
- 3:06:54budget? And then also add in what your
- 3:06:56lessons are learned.
- 3:06:59The difference between the journey and
- 3:07:01the destination of project management is
- 3:07:03the difference between the tasks and the
- 3:07:06people and the schedule that is meant to
- 3:07:09accomplish the goals of the project and
- 3:07:11the final deliverable, the final product
- 3:07:14that you're delivering. Um so let's
- 3:07:16let's suppose that a project is building
- 3:07:19software. They're building a software
- 3:07:21package. Um the journey is about the
- 3:07:24process that's involved in building that
- 3:07:26software. who's going to do what jobs?
- 3:07:29What resources do we need to accomplish
- 3:07:31our goals? What are the goals? What's
- 3:07:33the vision of the product? What are some
- 3:07:35potential roadblocks? Um what are
- 3:07:37dependencies that this project has? What
- 3:07:39do we need to make sure that we have in
- 3:07:41place so that we can uh accomplish all
- 3:07:43of our tasks? The destination is the
- 3:07:46software product itself along with any
- 3:07:50um extra things that are needed to get
- 3:07:52that software to the customer. So for
- 3:07:54example, marketing or um some
- 3:07:57advertising
- 3:07:59um manuals that the uh or or or user
- 3:08:02guides that the software will need to
- 3:08:04support it. Um ensuring that there's a
- 3:08:06software u support system in place for
- 3:08:09that software package. That's the
- 3:08:11destination. Ensuring that all those
- 3:08:13things are in place.
- 3:08:15>> Well, first of all, I would advise all
- 3:08:17of you to try to understand as best you
- 3:08:19can the art of project management. This
- 3:08:22includes effective communications,
- 3:08:24influencing, motivation, coaching, and
- 3:08:27more. Learn these skills. Try to be as
- 3:08:30good at these skills as you can. But
- 3:08:32along with those business skills or soft
- 3:08:35skills, understand the science of
- 3:08:37project management as well. Understand
- 3:08:39life cycles. Know how a project needs to
- 3:08:42be planned from beginning to end. And
- 3:08:45know what you know, know what you don't
- 3:08:46know, and surround yourself with people
- 3:08:48who know what you don't know. One of the
- 3:08:50big myths is that the project manager
- 3:08:52needs to be the expert in everything.
- 3:08:55That is wrong. A project manager needs
- 3:08:57to understand where they are the expert,
- 3:09:00but also where they're not the expert
- 3:09:02and surround themselves with people who
- 3:09:04are.
- 3:09:07A successful journey is well thought out
- 3:09:09and well planned. It doesn't skip the
- 3:09:12planning part of the actual journey. You
- 3:09:15have to have that in order to have a
- 3:09:17successful journey. From there, you're
- 3:09:19able to gather all the right resources.
- 3:09:22It might be products, it might be people
- 3:09:25involved like your team members, but
- 3:09:27making sure that you have all the right
- 3:09:29resources. And then to have a successful
- 3:09:32destination is to understand the true
- 3:09:35scope and expectations.
- 3:09:38>> I think there's many things that a
- 3:09:39project manager can do to ensure a
- 3:09:41successful journey and to ensure that
- 3:09:43the destination is reached. Um, in my
- 3:09:47experience, probably the biggest aspect
- 3:09:49of a good project manager is
- 3:09:51communication. Um, a project manager has
- 3:09:54to be both a coach, um, as well as a
- 3:09:58person that's able to drive the project
- 3:10:00forward. Um I don't think a project
- 3:10:01manager needs to be uh a subject matter
- 3:10:04expert on every aspect of the project um
- 3:10:07or what the project team is building but
- 3:10:10they do need to be able to talk about um
- 3:10:12what that project comprises uh some of
- 3:10:15the technical aspects of that project
- 3:10:18and they need to have that that level of
- 3:10:20expertise so that they can communicate
- 3:10:21properly to every stakeholder and um and
- 3:10:25person involved in in accomplishing the
- 3:10:27goals of that project. So, communication
- 3:10:29to me is a is a big one. Another one is
- 3:10:33um being able to manage time. Um and
- 3:10:36this it sounds like a it sounds like
- 3:10:38it's a very basic thing to be able to
- 3:10:40manage time. We all have to manage time
- 3:10:42in our day and what we're going to
- 3:10:43accomplish and what we're going to be
- 3:10:44doing in a given day. But when I talk
- 3:10:46about time management, I'm talking about
- 3:10:48u being able to know um how uh different
- 3:10:52aspects of the project need to get
- 3:10:55accomplished in what order. A third
- 3:10:57aspect for ensuring that the journey uh
- 3:11:00is done in a way that accomplishes the
- 3:11:03project's goals is to um know how to
- 3:11:06weight things. Um and what I mean by
- 3:11:08that is not everything is worth calling
- 3:11:12a meeting for or not everything is worth
- 3:11:14sending out uh a broad mail to upper
- 3:11:16management and to the team. Some things
- 3:11:19need to be um ignored sometimes. So that
- 3:11:23waiting aspect I think is very very
- 3:11:25important. So that that those three
- 3:11:27aspects along with a bunch of other
- 3:11:28things but those to me are very critical
- 3:11:30for ensuring that the journey of a
- 3:11:33project is successful. Um ensuring that
- 3:11:36the destination is successful really
- 3:11:39means um to me uh thinking through what
- 3:11:42does the endgame look like. I think a
- 3:11:44lot of project managers look at the
- 3:11:47tasks that need to be accomplished and
- 3:11:49what the team is going to do for those
- 3:11:51tasks. Um but they forget that once the
- 3:11:54project is is done, once the the product
- 3:11:57is built or whatever it is that you're
- 3:11:58delivering is is accomplished, what does
- 3:12:01that look like? Um how do you
- 3:12:02communicate that out that things are
- 3:12:04completed? How do you ensure that
- 3:12:06stakeholders um are satisfied? Uh you
- 3:12:09may think that you accomplish the
- 3:12:11project's goals, but your stakeholders,
- 3:12:13the people that are actually receiving
- 3:12:15the product may not agree with you. So,
- 3:12:17uh, you might ask a question like it, is
- 3:12:21there going to be a follow- on to this
- 3:12:22project where things that we weren't
- 3:12:24able to get to in the first version, we
- 3:12:26want to accomplish in the second
- 3:12:27version? Asking those types of questions
- 3:12:29once you've delivered the product or pro
- 3:12:32the project is complete so that your
- 3:12:34stakeholders have an opportunity to
- 3:12:36provide more input there. So, the
- 3:12:38destination really is about thinking
- 3:12:39about it ahead of time. Um, playing it
- 3:12:42out in your mind, almost roleplaying.
- 3:12:44The project is now done. What does that
- 3:12:46mean? How do we get this to the
- 3:12:47customer? How do we get this to the
- 3:12:49user? How do we get this to upper
- 3:12:51management? So, really ensuring that the
- 3:12:54um the the stakeholders are happy, upper
- 3:12:57management is happy, and your team is
- 3:13:00happy at the end of the project.
- 3:13:05[Music]
- 3:13:12Welcome to expert viewpoints project
- 3:13:15management the journey example. In this
- 3:13:18video we will hear from project managers
- 3:13:20discussing the journey examples of
- 3:13:22project management.
- 3:13:24>> I highly recommend each and every one of
- 3:13:26you to if you have a chance visit
- 3:13:29www.pmi.org.
- 3:13:32That's the project management institute.
- 3:13:34And I want to share ever so briefly a
- 3:13:37very successful project and give you a
- 3:13:39couple of reasons why it was so
- 3:13:41successful. First of all, the challenge.
- 3:13:44A catastrophic weather event destroyed
- 3:13:46roads and cut off British Columbia's
- 3:13:49lower mainland, including Vancouver,
- 3:13:51from the rest of Canada.
- 3:13:54A huge project was needed. What was the
- 3:13:57solution? British Columbia's Ministry of
- 3:13:59Transportation and Infrastructure used a
- 3:14:02project management approach based on a
- 3:14:05guide to the project management body of
- 3:14:07knowledge. The acronym for that is the
- 3:14:09pinach guide. They use this guide to
- 3:14:12prioritize repairs and reopen critical
- 3:14:15routes as quickly as possible. This
- 3:14:18included network analysis, identifying
- 3:14:20critical paths, requirements analysis,
- 3:14:23creating a work breakdown structure,
- 3:14:26communications planning, implementing
- 3:14:29communication protocols, risk
- 3:14:31management, preparing risk assessment
- 3:14:33and responses, and in addition
- 3:14:36soliciting the management of
- 3:14:39contributors and interested parties as
- 3:14:41well. what I shared with you a moment
- 3:14:43ago. Know what you know, know what you
- 3:14:45don't know, and surround yourself with
- 3:14:46people who know what you don't know. So,
- 3:14:48what was the outcome? Highway 5, the
- 3:14:50principal corridor for transportation of
- 3:14:53goods to and from the port of Vancouver,
- 3:14:55Canada, was reopened to commercial
- 3:14:58traffic in 35 days.
- 3:15:01This is a successful project and we hope
- 3:15:04that all of your projects can be equally
- 3:15:07as successful.
- 3:15:09So, I got a project at my last company
- 3:15:12and it was very large. I had over 200
- 3:15:14sites and it was global and to give you
- 3:15:17a key idea, it was a plastics company.
- 3:15:21So, they're all over the world. Co hit
- 3:15:23in the middle of it. We had our plan
- 3:15:25really thought out as far as our overall
- 3:15:28journey. And of course it changed, but
- 3:15:30since we planned so well in advance, we
- 3:15:33were able to easily shift around the
- 3:15:36different locations and then we still
- 3:15:38had the end result for our destination,
- 3:15:41which was to complete those sites.
- 3:15:46>> An example of a a project that I thought
- 3:15:49uh run really well and met the criteria
- 3:15:52of a successful journey as well as a
- 3:15:55successful destination. um was at my
- 3:15:58time at a big corporation. I was on a
- 3:16:01team that was developing a product that
- 3:16:03was um essentially last uh in the in the
- 3:16:06competitive landscape. Um and our team
- 3:16:09had to play catch-up. And there was a
- 3:16:12project manager that uh helped us get
- 3:16:14there from a marketing perspective. Um,
- 3:16:17and what she would do is get us all into
- 3:16:20a room twice a week and she had a really
- 3:16:23nice spreadsheet and she would have
- 3:16:26everyone go through their items in the
- 3:16:28spreadsheet. Um, she kept our uh,
- 3:16:31project time boxed or line items.
- 3:16:36She kept our line items time boxed so
- 3:16:39that we didn't, you know, rattle on
- 3:16:41about things that weren't important. if
- 3:16:43as we were giving our status we went off
- 3:16:45track, she would ensure that we stayed
- 3:16:47on track and she would gently nudge us
- 3:16:50back into the right uh right frame of
- 3:16:52mind so that we were talking about the
- 3:16:53items that we needed to talk about. And
- 3:16:56I remember um at the time I thought that
- 3:17:00uh even though she was very direct and
- 3:17:01she kept the project moving and she kept
- 3:17:03us all on task, she did it in a way that
- 3:17:06actually kept us motivated. So, as we
- 3:17:08saw project uh progress every other day
- 3:17:11or you know twice a week um we actually
- 3:17:13got motivated. It was a lot of work and
- 3:17:16she kept us on task and we weren't
- 3:17:17allowed to not deliver. Um but she did
- 3:17:21it in a way that I always felt like hey
- 3:17:23we're actually doing something. We're
- 3:17:24getting we're making the project better.
- 3:17:26We're moving this this project forward
- 3:17:29by ensuring that our customers know what
- 3:17:32our product does and why it does it
- 3:17:34better than the competition. So in terms
- 3:17:36of that journey, she was a really good
- 3:17:39project manager for helping us make
- 3:17:42progress um you know every day that we
- 3:17:45had to work on something informing the
- 3:17:47rest of our peers and management about
- 3:17:49that progress and then being able to see
- 3:17:52the impact of that progress in our
- 3:17:54product uh in the the general product
- 3:17:57that we were building but also um see
- 3:18:00that result in the marketplace as we
- 3:18:01were making you know reaching those
- 3:18:03goals.
- 3:18:06[Music]
- 3:18:13[Music]
- 3:18:17Welcome to How is this course different?
- 3:18:20After watching this video, you will be
- 3:18:23able to discuss why this course is
- 3:18:25unique, explain how this course can help
- 3:18:28project managers stand out, and list
- 3:18:31three common project constraints.
- 3:18:34This course focuses on project
- 3:18:36management methodologies, structures,
- 3:18:38and principles. Now, principles and
- 3:18:41methodologies do provide the foundation
- 3:18:43needed to address most project
- 3:18:45scenarios, but this course goes further
- 3:18:47than other project management courses by
- 3:18:50focusing on both the science and the art
- 3:18:53of managing a project. And we achieve
- 3:18:55this unique combination of art and
- 3:18:57science by encouraging project managers
- 3:19:00to look at a project through a new lens
- 3:19:02and to adopt creative approaches
- 3:19:04including innovative solutions and
- 3:19:07unique methods such as datadriven
- 3:19:09decision-m and involving stakeholders.
- 3:19:12This approach ensures the long-term
- 3:19:14sustainability and effectiveness of
- 3:19:17projects. Now with most projects,
- 3:19:20leaders are overburdened and the
- 3:19:22production team has aggressive goals. As
- 3:19:25a result, supply orders may become
- 3:19:27delayed. A project manager must work
- 3:19:30within a defined budget and time frame
- 3:19:33despite these constraints and tight
- 3:19:35deadlines. A successful project manager
- 3:19:38should know how to navigate these and
- 3:19:40other challenging scenarios. In this
- 3:19:43course, we will explore concepts, tools,
- 3:19:45and tips and tricks to execute projects
- 3:19:48successfully.
- 3:19:50Business leaders often face three main
- 3:19:52project management constraints: time,
- 3:19:55cost, and scope. And managing these
- 3:19:58three constraints can be challenging for
- 3:20:00a project manager, but it is also the
- 3:20:02primary goal. While other project
- 3:20:05management courses focus on only two
- 3:20:07constraints, this course will push you
- 3:20:09to succeed with all three.
- 3:20:12In our course, we provide key insights
- 3:20:15from project management specialists and
- 3:20:18detailed instructions on using and
- 3:20:20implementing project management tools.
- 3:20:22We will also teach you about different
- 3:20:24project management models to help you
- 3:20:27adapt to various projects and shifting
- 3:20:29demands. This includes insights into
- 3:20:32selecting and tailoring project
- 3:20:34management models depending on the
- 3:20:36project's needs. So, by streamlining
- 3:20:39your project management processes using
- 3:20:41the tools and tips you'll learn in this
- 3:20:43course, you will be able to deliver
- 3:20:45projects that are on time, below budget,
- 3:20:48and within scope.
- 3:20:51In this video, you learned that this
- 3:20:53course teaches you the art and science
- 3:20:55of project management. The three main
- 3:20:58constraints projects face are time,
- 3:21:00cost, and scope. And this course
- 3:21:03provides professional insights,
- 3:21:05instructions, and models for project
- 3:21:07managers to navigate challenges.
- 3:21:13[Music]
- 3:21:22Welcome to traditional project
- 3:21:23management. After watching this video,
- 3:21:26you will be able to identify two key
- 3:21:29factors considered to evaluate a
- 3:21:31project, explain four major approaches
- 3:21:34to project management, define the
- 3:21:36composition of an agile team, and
- 3:21:39describe Stacy's matrix. Delivering a
- 3:21:42project can be a challenging task. A
- 3:21:45project manager's role is crucial in
- 3:21:47today's corporate world and there is a
- 3:21:50growing need for facilitating high-level
- 3:21:52processes in businesses. A project
- 3:21:55manager needs to consider two key
- 3:21:57factors when evaluating a project. First
- 3:22:00is the frequency of deliverables. Some
- 3:22:03clients require products or services to
- 3:22:06be delivered at project's end while
- 3:22:08others prefer frequent deliveries
- 3:22:10throughout the project's life cycle.
- 3:22:13Second is the frequency of modifying
- 3:22:15specifications of project deliverables
- 3:22:18and the project manager must plan
- 3:22:20accordingly. The types of approaches
- 3:22:22that project managers can adopt to
- 3:22:25deliver projects successfully include
- 3:22:27predictive, incremental, iterative, and
- 3:22:30agile. As the name suggests, the
- 3:22:33predictive approach implies predicting
- 3:22:35the final product at the beginning of a
- 3:22:37project. The project manager adopts this
- 3:22:40approach to immediately deliver the
- 3:22:42final product at the end of the project
- 3:22:45with minimal changes. The predictive
- 3:22:48approach starts with planning an event
- 3:22:50then implementing it and finally closing
- 3:22:53the event. This approach is unsuitable
- 3:22:55for a project with dynamic requirements
- 3:22:58or an agile atmosphere. In this
- 3:23:01approach, a detailed project plan must
- 3:23:03be created clearly defining the solution
- 3:23:06and goal. A project manager adopts this
- 3:23:09approach for a project with lower scope
- 3:23:12for changes and a lower frequency of
- 3:23:14delivery. In the incremental approach,
- 3:23:17the manager determines a project scope
- 3:23:20early, but the time and cost estimates
- 3:23:22can be modified later in the project if
- 3:23:25necessary. This method involves
- 3:23:27developing the product to supply by
- 3:23:30gradually enhancing its capabilities and
- 3:23:32as a result the team designs, evaluates
- 3:23:35and implements the product before it
- 3:23:37gets finalized. This approach enables a
- 3:23:40developer to modify the product early on
- 3:23:43rather than wait until the end. A
- 3:23:46project manager adopts an iterative
- 3:23:48approach to make frequent deliverables
- 3:23:50for the client. And this approach
- 3:23:52ensures constant testing which leads to
- 3:23:54higher usability. An iterative approach
- 3:23:57allows teams to improve and address new
- 3:24:00changes or findings continuously. It is
- 3:24:03likely that the final product will be
- 3:24:05delivered on time and is of high
- 3:24:08quality. In an iterative approach, you
- 3:24:11define the process by getting a sign off
- 3:24:13on the project objectives. Next, measure
- 3:24:16the process and determine if you can
- 3:24:18achieve the key goals. Then you analyze
- 3:24:21the process to identify the potential
- 3:24:23process gaps and finally you implement
- 3:24:27and control the process to make all the
- 3:24:29required process updates and roll out
- 3:24:31the approach to the organization.
- 3:24:34The project manager uses an agile
- 3:24:37approach when there are multiple project
- 3:24:39deliverables and many changes are likely
- 3:24:41to occur. In the agile approach, the
- 3:24:44manager defines the complete project
- 3:24:46requirement and the documentation for
- 3:24:48this takes the form of user stories. The
- 3:24:51project manager then determines the
- 3:24:53duration of the iteration or sprint by
- 3:24:56prioritizing the requirements. Then the
- 3:24:59manager performs a sprint demo or
- 3:25:01project review for stakeholders at the
- 3:25:04end of the iteration. Next, the team
- 3:25:06retrospects to determine the changes
- 3:25:09required for more efficient and
- 3:25:11effective delivery in the following
- 3:25:12sprint. And finally, the project manager
- 3:25:16repeats steps one to four in the agile
- 3:25:18approach until all requirements are met
- 3:25:21to the acceptance of the customer and
- 3:25:23key stakeholders. An agile team is an
- 3:25:26organized group of members collaborating
- 3:25:29to deliver a product using the iterative
- 3:25:32approach. No formal project manager role
- 3:25:35exists in this case, but two key
- 3:25:37positions work with the development team
- 3:25:40to compensate for the absence of the
- 3:25:42project manager role. One position is
- 3:25:45the product owner who plays a unique and
- 3:25:47demanding role. A product owner decides
- 3:25:50what the team will build next to provide
- 3:25:52greater customer value. And the other
- 3:25:55role is a scrum master who needs to
- 3:25:58foster an effective and productive work
- 3:26:00environment. And the scrum master guides
- 3:26:03the team members to understand scrum
- 3:26:05values, principles, and practices. Ralph
- 3:26:09D. Stacy, a British organizational
- 3:26:11theorist and professor of management at
- 3:26:13Herford Shshire Business School,
- 3:26:15research to understand human
- 3:26:17organizations and their management. He
- 3:26:20created the Stacy matrix, widely used to
- 3:26:22determine the approach needed to deliver
- 3:26:24a project successfully. Now, Stacy's
- 3:26:27matrix enables analysis based on two
- 3:26:30critical criteria. Requirement
- 3:26:32uncertainty and technical degree of
- 3:26:35uncertainty. Requirement uncertainty
- 3:26:37implies determining the level of
- 3:26:39agreement between key stakeholders on
- 3:26:42final project deliverables and technical
- 3:26:45degree of uncertainty implies
- 3:26:47determining the technology required to
- 3:26:49implement the project.
- 3:26:52In this video, you learned that the two
- 3:26:54factors project managers use to evaluate
- 3:26:57a project include the frequency of
- 3:27:00deliverables and the frequency of
- 3:27:02modifying specifications of project
- 3:27:04deliverables. The four approaches to
- 3:27:07project management are predictive,
- 3:27:09incremental, iterative, and agile. An
- 3:27:12agile team is an organized group of
- 3:27:14members collaborating to deliver a
- 3:27:16product using an iterative approach. The
- 3:27:19project manager's role does not exist in
- 3:27:22the agile team. Instead, leadership
- 3:27:24responsibilities are divided among the
- 3:27:27product owner and the scrum master. And
- 3:27:30Stacy's matrix assists project managers
- 3:27:33in determining the type of approach they
- 3:27:35need to deliver a project successfully.
- 3:27:38The matrix enables the analysis of two
- 3:27:40critical criteria, requirement
- 3:27:42uncertainty and the technical degree of
- 3:27:45uncertainty.
- 3:27:49[Music]
- 3:27:56Welcome to expert viewpoints life cycle
- 3:27:59selection. In this video we will hear
- 3:28:02from project managers discussing the
- 3:28:04importance of life cycle selection.
- 3:28:07>> In your opinion why is proper life cycle
- 3:28:10selection so important? I believe that
- 3:28:13proper project management life cycle
- 3:28:16selection is so important because I've
- 3:28:18worked on a number of projects with
- 3:28:21using different project management
- 3:28:23methodologies and life cycles and each
- 3:28:26project has um different characteristics
- 3:28:30and different risks that make choosing a
- 3:28:34lifestyle that fits those or a life
- 3:28:37cycle that fits those risks um and those
- 3:28:40deliverables and the objectives of the
- 3:28:42project really important.
- 3:28:44>> Let me give you a statistic. Per the
- 3:28:46project management institute, some 50 to
- 3:28:4975% of all projects fail to achieve
- 3:28:53their desired schedule, cost, and scope
- 3:28:56goals. That's not a very exciting track
- 3:28:59record. Project management is very, very
- 3:29:03complex. A project life cycle allows you
- 3:29:06to select the most effective method or
- 3:29:08roadmap if you will to ensure project
- 3:29:12success. In addition, selecting the
- 3:29:14right life cycle allows you to tailor
- 3:29:17your project to meet the project's
- 3:29:20specific needs. In project management, a
- 3:29:24one-sizefitsall
- 3:29:25methodology unfortunately will often
- 3:29:28result in failure.
- 3:29:31Choosing the right methodology can be a
- 3:29:33critical part overall for the team, the
- 3:29:36team dynamic, whether it's the customer
- 3:29:39and the stakeholders as it can change
- 3:29:41how everything is done along with the
- 3:29:44communication. For example, there's
- 3:29:46waterfall, agile, scrum. It really
- 3:29:48depends on what is best for your
- 3:29:51customer, your stakeholders, and your
- 3:29:53overall team.
- 3:29:55>> What are life cycle selection tips that
- 3:29:58I can provide?
- 3:30:00Life cycle selection tips that come to
- 3:30:03mind are really understanding the inputs
- 3:30:05and outputs into each of the different
- 3:30:07phases that are part of your project.
- 3:30:10Together with that, plan out your
- 3:30:12critical path. I think understanding
- 3:30:15those three things and the resources who
- 3:30:18are involved are really going to get you
- 3:30:20to the right life cycle to use for the
- 3:30:22project.
- 3:30:24um identifying the resources that are
- 3:30:26both part of the project but also your
- 3:30:28internal uh stakeholders, your internal
- 3:30:31sponsors and your client preferences.
- 3:30:34What affinity do they have to any one or
- 3:30:37more of the different life cycles,
- 3:30:40whether or not it's hybrid, waterfall,
- 3:30:42scrum, or agile. If you've got
- 3:30:45stakeholder input, stakeholder approval
- 3:30:48and resource commitment, you should be
- 3:30:50able to lead a successful project with
- 3:30:52any one of the life cycles. To me, I
- 3:30:55really take a look and take the time to
- 3:30:58see what I am going to be developing as
- 3:31:01far as a product or service. If it's
- 3:31:04something that I do every single day and
- 3:31:06like let's say it's a PB&J, I'm going to
- 3:31:08do a waterfall. It's very simple step by
- 3:31:11step. However, with my last company, for
- 3:31:15example, we did cloud security. So, a
- 3:31:17lot of times we did agile just because
- 3:31:19things are changing, customers
- 3:31:21environments are different. So, it
- 3:31:22really depends on what you're going to
- 3:31:24do.
- 3:31:26So, just a couple tips when um choosing
- 3:31:30a life cycle. Um as a beginner, choosing
- 3:31:34a project management life cycle can be
- 3:31:36really difficult. you may not know uh
- 3:31:38all of the ins and outs of each of the
- 3:31:41life cycles and you may not know which
- 3:31:43questions to ask. But I think um with
- 3:31:46any project it's really important to
- 3:31:49really think about
- 3:31:51uh the key principles of each life
- 3:31:54cycle, the benefits that those life
- 3:31:57cycles um produce, and then the
- 3:32:00challenges and risks that are associated
- 3:32:03with each of those life cycles. and then
- 3:32:06ask yourself what principles, what
- 3:32:09benefits
- 3:32:10um are really going to help you meet the
- 3:32:12project objectives of the project that
- 3:32:15you're
- 3:32:16uh getting ready to project manage the
- 3:32:18best. So you can ask yourself questions
- 3:32:21about things like resourcing needs,
- 3:32:24budgets, what are project risks, what's
- 3:32:27the likelihood that the requirements or
- 3:32:29the project objectives are going to
- 3:32:31change. This is a very simple response.
- 3:32:35Base your project life cycle selection
- 3:32:37on two key factors.
- 3:32:40First of all, how much do stakeholders
- 3:32:42agree on what the final project
- 3:32:45deliverables should look like? If you
- 3:32:48have five stakeholders and they all
- 3:32:50agree this is what we need, that's a
- 3:32:53high level of agreement. But if you have
- 3:32:55five stakeholders and they all have
- 3:32:57different understanding or different
- 3:32:59ideas on what success looks like, then
- 3:33:02unfortunately your agreement is low.
- 3:33:05Secondly, how complex is the project's
- 3:33:08technology?
- 3:33:10How steep of a learning curve is there
- 3:33:12going to be for you to be successful?
- 3:33:14How much innovation, how much creativity
- 3:33:17is going to be required?
- 3:33:20What type of life cycle do you prefer
- 3:33:22and why? I'm going to have to build off
- 3:33:24the previous question and answer again.
- 3:33:28When technology is complex and agreement
- 3:33:31is low, I prefer an agile or scrum
- 3:33:35approach. When agreement among
- 3:33:38stakeholders is high and complexity is
- 3:33:42low, then in most cases a traditional or
- 3:33:45waterfall method is going to work best.
- 3:33:49Don't guess on which life cycle is going
- 3:33:52to work well for you.
- 3:33:55Use the analysis factors that I shared
- 3:33:58with you of agreement and complexity and
- 3:34:02allow the reality of the project to
- 3:34:06objectively make that decision for you.
- 3:34:10>> My preference is agile. You're able to
- 3:34:12take the time to really work with your
- 3:34:15team and have that team development
- 3:34:17moment. whether you're doing Q&A, you're
- 3:34:20doing brainstorming sessions, but you're
- 3:34:22doing it throughout your project. And
- 3:34:24then I also really like the aspect of
- 3:34:26having sprints. That way we can really
- 3:34:28focus on a twoe sprint, for example, on
- 3:34:31those particular tasks and then move on.
- 3:34:35So for me, for most projects, I prefer a
- 3:34:38more agile approach. So my favorite
- 3:34:40framework is a framework called the
- 3:34:42scaled agile framework. Um, it's my
- 3:34:45favorite for big projects at very large
- 3:34:48organizations.
- 3:34:50But on the other hand, when I'm working
- 3:34:52on personal projects, so things that
- 3:34:55maybe I'm working on around the house or
- 3:34:58personal projects in my own life, um, I
- 3:35:01do prefer a more traditional waterfall
- 3:35:03approach. I like to take a you know fail
- 3:35:05fast methodology in those things and I
- 3:35:08don't like to spend too much time kind
- 3:35:10of on each phase of the project but I do
- 3:35:12tend in my personal life to take more
- 3:35:14waterfall approach.
- 3:35:18[Music]
- 3:35:27Welcome to project management phases.
- 3:35:30After watching this video, you will be
- 3:35:32able to discuss the purpose of project
- 3:35:35management phases, describe different
- 3:35:37ways to approach creative phases in a
- 3:35:40project and some models for doing so,
- 3:35:43and list the project phases that will be
- 3:35:45used in this series of courses.
- 3:35:48Project management models consist of
- 3:35:50phases that a project will go through.
- 3:35:53Dividing the project into phases
- 3:35:55segments the workload into more
- 3:35:58manageable pieces, making the project
- 3:36:00manager's role of planning and guiding a
- 3:36:03project easier. Phases give the project
- 3:36:06structure and logical steps to achieve
- 3:36:08goals and deliver highquality products.
- 3:36:11Providing this high-level structure for
- 3:36:13the program makes it easier to plan the
- 3:36:16activities and tasks to complete each
- 3:36:18phase. So the phases used in project
- 3:36:22management vary and there are different
- 3:36:24opinions about how many phases to use.
- 3:36:27Let's look at a few examples. The lean
- 3:36:29model uses five phases which are define,
- 3:36:33measure, explore, develop and implement.
- 3:36:36In six sigma projects, the five project
- 3:36:39phases are called define, measure,
- 3:36:41analyze, improve and control. In
- 3:36:44waterfall, there are six phases.
- 3:36:47requirements, system design,
- 3:36:49implementation, testing, deployment, and
- 3:36:52maintenance. And the extreme programming
- 3:36:55software development process has a
- 3:36:57one-time planning phase, then repeated
- 3:36:59iterations of four phases: designing,
- 3:37:03coding, testing, and listening. Now, the
- 3:37:06number of names for the different phases
- 3:37:08and different structures available is
- 3:37:11basically limitless, and new ones will
- 3:37:13surely be invented in the future as
- 3:37:16businesses and the project management
- 3:37:18profession evolve. If you look closer at
- 3:37:21the many versions of phases available
- 3:37:23for project management, you'll notice
- 3:37:25that although each set of phases may
- 3:37:28have different names, they are generally
- 3:37:30aligned on the activities needed to
- 3:37:32complete a project. and they are also
- 3:37:35usually aligned on the activities that
- 3:37:37are required to complete a phase. You
- 3:37:40can look at the variety of available
- 3:37:41models and select one that will work
- 3:37:44best for each project. For the purposes
- 3:37:47of the three courses in this series, we
- 3:37:49will use the project phases as designed
- 3:37:52in the project management body of
- 3:37:54knowledge edition six guide also known
- 3:37:57as pimach 6. Now the five phases we will
- 3:38:01use are initiation, planning, execution,
- 3:38:05monitoring and controlling and closing.
- 3:38:08And as you work your way through the
- 3:38:10course materials, keep in mind that we
- 3:38:12have anchored the course on these
- 3:38:14commonly used phrases. Names and
- 3:38:17combinations of activities may change,
- 3:38:20but you should be able to map the
- 3:38:22activities from one model to another.
- 3:38:25For example, you might be using the
- 3:38:27waterfall model on your project with its
- 3:38:29six phases: requirements, system design,
- 3:38:32implementation, testing, deployment, and
- 3:38:35maintenance. To map these phases back to
- 3:38:38the phases used in this course, you
- 3:38:41could consider both the implementation
- 3:38:43and testing phases part of the execution
- 3:38:46phase in the PMB6
- 3:38:48model. Tweaks and adjustments like this
- 3:38:51are part of tailoring your approach and
- 3:38:54understanding how the different models
- 3:38:56can be used to fit a specific project.
- 3:38:59In the third course of this series, we
- 3:39:01will discuss how a project manager's
- 3:39:04activities shift throughout the project
- 3:39:06life cycle. From setting up templates
- 3:39:08through the final closing report, the
- 3:39:11role of the project manager shifts
- 3:39:13throughout the phases.
- 3:39:15In this video, you learned that dividing
- 3:39:18a project into phases helps a project
- 3:39:20manager plan how to complete a project.
- 3:39:23Different models and project structures
- 3:39:26call for different numbers and names for
- 3:39:28phases, but they can often be aligned to
- 3:39:30a core set of activities. And the five
- 3:39:33project phases that will be used in the
- 3:39:36project management series are project
- 3:39:38initiation, planning, execution,
- 3:39:41monitoring, and controlling, and
- 3:39:43closing.
- 3:39:47[Music]
- 3:39:55Welcome to different types of
- 3:39:56organizations.
- 3:39:58After watching this video, you will be
- 3:40:00able to describe the effect of
- 3:40:03organizational structure on project
- 3:40:05management, identify types of
- 3:40:07organizational structures, and define
- 3:40:10how to align project objectives with the
- 3:40:13organizational strategy.
- 3:40:15Organizational structure refers to how a
- 3:40:18company organizes its tasks, allocates
- 3:40:21resources, and coordinates different
- 3:40:23teams within the organization. It
- 3:40:26determines each employees role and place
- 3:40:29in the organization and is essential for
- 3:40:31organizational growth. But there are
- 3:40:34different types of organizational
- 3:40:36structures and project managers must be
- 3:40:39able to identify which model suits them
- 3:40:41most. Now it is important for project
- 3:40:44managers to understand the fundamental
- 3:40:46principles of building an organizational
- 3:40:49structure. These include the project
- 3:40:51manager's authority, role, resource
- 3:40:53availability, budget control, and
- 3:40:56project management administration staff.
- 3:40:59With the authority principle, a project
- 3:41:02manager can make decisions, issue
- 3:41:04orders, and perform resource allocation
- 3:41:06to achieve the set goal. And in some
- 3:41:09organizations, the authority of a
- 3:41:11project manager is greater, which
- 3:41:14enhances their ability to influence
- 3:41:16others and achieve the team and
- 3:41:18organizational goals. Another principle
- 3:41:21of building an organizational structure
- 3:41:23is the project manager's role. Some
- 3:41:26organizations hire project managers
- 3:41:29part-time while others employ full-time
- 3:41:31project managers, which impacts project
- 3:41:34management in the organization.
- 3:41:37Next is a project's resource
- 3:41:39availability. Some organizations provide
- 3:41:42resources to plan and manage a project
- 3:41:45at a high level. But in other
- 3:41:47organizations, a project manager might
- 3:41:50face challenges in getting the required
- 3:41:52level of support. Another principle is
- 3:41:56budget control. In some organizations, a
- 3:41:59project manager manages and controls the
- 3:42:01budget, while in others, a functional
- 3:42:04manager manages and controls the budget.
- 3:42:07And finally, there's the project
- 3:42:09management administration staff. The
- 3:42:11staff size may differ depending on the
- 3:42:14organizational structure. Staff size
- 3:42:16impacts how a project manager manages a
- 3:42:19project. The two organizational
- 3:42:22structures the project management
- 3:42:24institute or PMI recognizes are
- 3:42:26functional and matrix. The functional
- 3:42:29organizational structure follows a
- 3:42:32hierarchical model. An organization with
- 3:42:34a functional structure groups employees
- 3:42:37into departments based on
- 3:42:39specialization. Every department
- 3:42:42designates a leader experienced in
- 3:42:44managing and supervising the functions
- 3:42:46of each employee. Such organizations
- 3:42:49have a top-down decisionmaking process
- 3:42:52in place and the decision-making power
- 3:42:55is centralized. Leaders of different
- 3:42:58departments communicate regularly to
- 3:43:00frame the organizational strategy and
- 3:43:03the low-level employees have little
- 3:43:05information about what's happening
- 3:43:07outside their department. In the matrix
- 3:43:10organizational structure, teams or
- 3:43:12groups report to multiple team leaders.
- 3:43:15Each team leader is assigned a member or
- 3:43:18a team from each functional area
- 3:43:20applicable to the project. So the
- 3:43:23functional team member reports to two
- 3:43:25bosses, the project leader and the
- 3:43:28functional manager. Now the three types
- 3:43:31of matrix structures are weak, balanced
- 3:43:34and strong. In the weak matrix
- 3:43:36structure, a project manager directly
- 3:43:39reports to the functional manager and
- 3:43:41provides support as a project
- 3:43:43coordinator with limited power. The
- 3:43:46balanced matrix structure is like the
- 3:43:48weak matrix structure except that in the
- 3:43:51former, the project manager has more
- 3:43:53authority and decision-making power. In
- 3:43:56the strong matrix structure, a project
- 3:43:58manager has more power than the
- 3:44:01functional manager, can use their
- 3:44:03project management skills on projects,
- 3:44:05and can determine resource allocation.
- 3:44:09A project manager needs to have project
- 3:44:11objectives aligned with the
- 3:44:13organizational strategy. Its advantage
- 3:44:16is that the project is of high quality
- 3:44:19and stays within the budget and timeline
- 3:44:22and all the stakeholders understand the
- 3:44:25project's goals and objectives.
- 3:44:28So in order to align the project
- 3:44:30objectives, managers should complete
- 3:44:32these five tasks. Communicate the
- 3:44:35project's value and aim and encourage
- 3:44:38significant sponsorship and backing.
- 3:44:40Plan to ensure the projects comply with
- 3:44:43the scope, schedule, and budget and meet
- 3:44:46the stakeholders needs. Determine what
- 3:44:48resources are required to complete the
- 3:44:51project successfully. Identify the
- 3:44:53stakeholders essentials for the
- 3:44:55project's success and seek their
- 3:44:57assistance. And finally, create a
- 3:45:00project charter that enables you to gain
- 3:45:02authority, support for hiring and
- 3:45:05planning, and clear sponsorship.
- 3:45:08In this video, you learned that an
- 3:45:11organizational structure is how a
- 3:45:13company organizes its tasks, allocates
- 3:45:15resources, and coordinates teams within
- 3:45:18the organization. The fundamental
- 3:45:20principles of building an organizational
- 3:45:22structure include the project manager's
- 3:45:25authority, role, resource availability,
- 3:45:28budget control, and administration
- 3:45:30staff. The different types of
- 3:45:32organizational structures are functional
- 3:45:34and matrix. And aligning project
- 3:45:37objectives with the organizational
- 3:45:38structure increases the likelihood that
- 3:45:41the project will be high quality, stay
- 3:45:44within budget and schedule, and all
- 3:45:46stakeholders will understand the project
- 3:45:48goal.
- 3:45:52[Music]
- 3:46:00Welcome to the project management
- 3:46:02office. After watching this video, you
- 3:46:05will be able to define a project
- 3:46:08management office, describe the common
- 3:46:10functions of project management offices,
- 3:46:12and list the three types of project
- 3:46:15management offices. A project management
- 3:46:18office, often referred to as a PMO, is
- 3:46:21responsible for activities that support
- 3:46:23project managers at a strategic level
- 3:46:25for an entire organization.
- 3:46:28And sometimes separate PMOs are
- 3:46:30established for large multi-year
- 3:46:32projects as well. What are the benefits
- 3:46:34of a PMO? By the project management
- 3:46:37institute or PMI definition, a PMO
- 3:46:41standardizes project related governance
- 3:46:43processes and facilitates the sharing of
- 3:46:45resources, tools, methodologies, and
- 3:46:48techniques. Additionally, the project
- 3:46:51management body of knowledge or pimach
- 3:46:53guide states organizations establish
- 3:46:56PMOs for a variety of reasons but with
- 3:46:58one core benefit in mind. Improved
- 3:47:01project management in terms of schedule,
- 3:47:04cost, quality, risk and other facets.
- 3:47:07Now, the PMO provides a central hub for
- 3:47:10multiple projects and seeks to identify
- 3:47:13cross project efficiencies. The PMO will
- 3:47:16use tools, practices, processes, tips,
- 3:47:19and more to support project management
- 3:47:21efforts. And standardizing project
- 3:47:24management practices across the
- 3:47:26organization is crucial, including
- 3:47:28techniques, documentation, culture, and
- 3:47:31tools. PMOs can also facilitate getting
- 3:47:35work done through their role in
- 3:47:36allocating resources to projects. This
- 3:47:39allocation is generally based on
- 3:47:41priority, schedule, and needs. Though
- 3:47:44each PMO will have its own method. Now
- 3:47:48one other important role of the PMO is
- 3:47:51driving accurate documentation. The PMO
- 3:47:54works with project managers to see that
- 3:47:56documentation such as timelines and
- 3:47:59meeting notes is captured and posted.
- 3:48:02When the project is closed, the PMO will
- 3:48:05review it. And if everything is
- 3:48:07accounted for, it will archive the
- 3:48:09project. PMOs are often responsible for
- 3:48:12reporting budgets and projects to
- 3:48:14company leadership. So project managers
- 3:48:17may work closely with PMO team members
- 3:48:20to prepare materials for these
- 3:48:22leadership updates. PMOs keep their eye
- 3:48:25on the future and the big picture. They
- 3:48:28work to identify commonalities so they
- 3:48:30can be addressed cohesively. Because the
- 3:48:33PMO works with so many projects, they
- 3:48:36can see the big picture and its trends.
- 3:48:39They can guide and coordinate the
- 3:48:40project managers with a high-level
- 3:48:43perspective that others may not be able
- 3:48:45to see. Now, of course, no two PMOs will
- 3:48:48ever be exactly alike, but three common
- 3:48:51types have emerged. Supportive. This
- 3:48:55type exerts a low level of control in
- 3:48:57decision-m, but does provide best
- 3:48:59practices, common oversight, and
- 3:49:02templates. A supportive PMO shares
- 3:49:05information and best practices in
- 3:49:07project management across the
- 3:49:09enterprise. Controlling. This type has
- 3:49:12some decision-making capabilities but
- 3:49:14not absolute control. They often review
- 3:49:17project managers work to ensure it meets
- 3:49:20the organization's practices, templates,
- 3:49:22and standards. A controlling PMO shares
- 3:49:26information in the same way as a
- 3:49:28supportive PMO. Controlling PMOs however
- 3:49:31establish rules for compliance and
- 3:49:34monitor adherence to those rules.
- 3:49:36Directive. This type leads with a high
- 3:49:39degree of control over the processes,
- 3:49:42standards, templates, reporting and
- 3:49:44documentation. The directive PMO
- 3:49:47provides information and may also manage
- 3:49:50compliance. And the most significant
- 3:49:52difference is the control of resources.
- 3:49:55Directive PMOs may manage all project
- 3:49:58management resources and assign them to
- 3:50:00projects to meet the organization's
- 3:50:02needs. PMOs can also be layered. For
- 3:50:06example, one layer of PMO may provide
- 3:50:09best practices, templates, and processes
- 3:50:12with a higher level PMO to govern and
- 3:50:14report to leadership.
- 3:50:17In this video, you learned that PMOs are
- 3:50:20responsible for activities that support
- 3:50:22project managers at a strategic level. A
- 3:50:25PMO standardizes processes including
- 3:50:28accurate documentation and facilitates
- 3:50:30sharing of resources. PMOs can be
- 3:50:33grouped into three types, supportive,
- 3:50:36controlling, and directive. And PMOs are
- 3:50:40much more than just project managers for
- 3:50:42project managers. They are essential to
- 3:50:44an organization and key to reaching its
- 3:50:47strategic goals.
- 3:50:51[Music]
- 3:51:01Welcome to expert viewpoints the project
- 3:51:04management office.
- 3:51:06In this video, we will hear from project
- 3:51:09managers discussing PMOs or project
- 3:51:12management offices.
- 3:51:15Well, first and foremost, we need to
- 3:51:16define what a PMO is. A PMO is a project
- 3:51:20management office. And a project
- 3:51:23management office can provide a
- 3:51:25multitude of service.
- 3:51:27There's different types of project
- 3:51:29management offices, but all PMOs provide
- 3:51:33one, two, or three of the following
- 3:51:36services. Number one, they provide
- 3:51:39needed guidance and support. They show
- 3:51:42you the way. Number two, they may ensure
- 3:51:46compliance to policies and procedures.
- 3:51:48They try to make sure that everyone is
- 3:51:50on the same page and everyone is doing
- 3:51:53it the right way. And last, but
- 3:51:55certainly not least, some PMOs may
- 3:51:57manage project management assignments to
- 3:52:00ensure optimal results. In that type of
- 3:52:03a project management office, if you were
- 3:52:05a project manager, you would be assigned
- 3:52:07to the PMO.
- 3:52:10How can a PMO be effective in an
- 3:52:12organization? The PMO is actually one of
- 3:52:14the most important organizations within
- 3:52:17an organization.
- 3:52:18Imagine a scenario where everybody's
- 3:52:20doing something different. There's no
- 3:52:22consistency. Nobody knows who to
- 3:52:24contact. There's no ownership of a
- 3:52:27process. There's no ownership of
- 3:52:29projects. That's what it looks like
- 3:52:31without a PMO. PMOs bring all of this
- 3:52:34together. They create policies,
- 3:52:36procedures, and make sense of the
- 3:52:38project management world for non-project
- 3:52:40management practitioners. It emphasizes
- 3:52:43the importance of project management and
- 3:52:45and can help remove those roadblocks
- 3:52:47that come up as you're working through
- 3:52:48projects and interfacing with other
- 3:52:50departments.
- 3:52:52It can help the project manager be
- 3:52:55successful.
- 3:52:57>> A project management organization may
- 3:52:59have PMs that are responsible for all
- 3:53:02different aspects of a project. Some
- 3:53:04project managers may be responsible for
- 3:53:06marketing. Some project managers may be
- 3:53:08responsible for development. Some
- 3:53:10project managers may be responsible for
- 3:53:12communication um outbound communication
- 3:53:15or communication with upper management.
- 3:53:18Each project manager has to evaluate
- 3:53:21what type of management is needed for
- 3:53:23that area that they're they're um
- 3:53:25managing and they need to run the
- 3:53:28project that's appropriate for that
- 3:53:30area. So I think a good PMO organization
- 3:53:34understands those nuances and
- 3:53:36understands the differences between say
- 3:53:38marketing and product development and
- 3:53:41has data and templates that are
- 3:53:42appropriate for the project that those
- 3:53:45project managers are developing.
- 3:53:47A PMO can also be just as destructive as
- 3:53:50it is positive, especially when
- 3:53:53processes are overly complicated and
- 3:53:55very difficult. Sometimes we'll see that
- 3:53:58there's hundreds of documentation and
- 3:54:00you can't find anything or the
- 3:54:02documentation is very old and it's not
- 3:54:04relatable anymore. It could also go
- 3:54:07ahead and assist with additional
- 3:54:09meetings that are not needed. It's just
- 3:54:11really making sure that the PMO is right
- 3:54:14for you and your team. Some things that
- 3:54:16can detract from uh the value of a
- 3:54:19project management organization many
- 3:54:21times for me is just unevenness.
- 3:54:24Um when you have a a project management
- 3:54:27organization where the project managers
- 3:54:29are of various skill sets or their
- 3:54:32expertise is uh varied and uneven um
- 3:54:36particularly for the people working on
- 3:54:37the team when the team can't expect that
- 3:54:40every project manager is going to um be
- 3:54:43a solid PM um I think that creates a lot
- 3:54:47of anxiety on the team and a lot of uh
- 3:54:50unevenness in the results of those
- 3:54:52projects.
- 3:54:54The primary purpose of a good project
- 3:54:56management office is to serve the needs
- 3:54:59of the organization's project managers.
- 3:55:02A common joke that I've heard on many
- 3:55:04occasions is concerning the government.
- 3:55:07When a government official comes and
- 3:55:09looks at you in the eye and says, "We're
- 3:55:11here to help." Normally, that's a pretty
- 3:55:13good laugh line. Well, unfortunately,
- 3:55:16that laugh line can hold true for PMOs
- 3:55:19as well. When a project management
- 3:55:21office or PMO is perceived as value
- 3:55:23added and moves the organizational
- 3:55:26project management bar upwards, it is
- 3:55:29indeed value added and perceived as such
- 3:55:31by the project managers in the
- 3:55:33organization. However, when a project
- 3:55:36management office becomes adversarial
- 3:55:39and is looked upon as a blocker, then
- 3:55:42the value is reduced.
- 3:55:45When you have a manager or a stakeholder
- 3:55:47that doesn't want a PMO to actually be
- 3:55:49in your organization, things that you
- 3:55:52can do to help present and help
- 3:55:55negotiate to have one would be a of
- 3:55:57course to come with the data. Be planned
- 3:55:59as much as possible. Come with
- 3:56:01testimonies. Talk about how you had one
- 3:56:03at your previous job and how it was very
- 3:56:05beneficial. Talk about the pros and cons
- 3:56:08of not having a PMO and what will
- 3:56:11happen. Well, just don't walk up to them
- 3:56:13and say, "I've got this great idea.
- 3:56:15Let's create a project management
- 3:56:17office." The best approach is to perform
- 3:56:20a root cause analysis of the
- 3:56:22organization's project management
- 3:56:24function as a whole. Determine what is
- 3:56:27working, what is not working, what needs
- 3:56:30to start, what needs to stop, what needs
- 3:56:33to stay, and what needs to change.
- 3:56:37As part of that root cause analysis, try
- 3:56:39to determine how creation of a project
- 3:56:41management office could potentially help
- 3:56:44provide needed solutions and propose
- 3:56:48that this new PMO, configure itself and
- 3:56:53its duties based on that objective
- 3:56:56analysis.
- 3:56:58be able to show the data, show what
- 3:57:00needs to be done, and show how a PMO
- 3:57:04creation is the best choice to achieve
- 3:57:06that goal.
- 3:57:08Well, I've been through this process
- 3:57:09before, and it is a challenge, but it
- 3:57:13isn't impossible,
- 3:57:16especially in an organization where
- 3:57:18project management may not be the
- 3:57:19priority or seen as a priority and that
- 3:57:22type of process may not be valued. And
- 3:57:25now I want you to understand it can't be
- 3:57:28done right away. It has to be over time.
- 3:57:30This isn't something you're going to
- 3:57:31come in and do in six months or a year
- 3:57:34or two years. It's something that you
- 3:57:36have to gain the favor of management. So
- 3:57:39that's the first step is really g
- 3:57:41management to support it. The second
- 3:57:43step is showing that value and that may
- 3:57:48be some kind of pilot for a couple
- 3:57:50projects. Um, and then you can start to
- 3:57:54develop that and put some real strong
- 3:57:57policies and procedures around that.
- 3:58:01But rolling it out slowly and
- 3:58:03incrementally is really the best way to
- 3:58:05approach that.
- 3:58:08[Music]
- 3:58:18Welcome to the 12 principles of project
- 3:58:21management. After watching this video,
- 3:58:24you will be able to describe project
- 3:58:26management principles and define the key
- 3:58:29principles listed in the project
- 3:58:31management body of knowledge or pinach
- 3:58:337th edition. Project management
- 3:58:36principles are the fundamental concepts,
- 3:58:38practices, and techniques that guide the
- 3:58:41effective management of projects. The
- 3:58:43project management institute or PMI
- 3:58:46developed 12 principles of project
- 3:58:48management and these principles are
- 3:58:50defined in the pinbox 7th edition.
- 3:58:53Effective project management is based on
- 3:58:55these principles which ensure the
- 3:58:57success of a project. The 12 principles
- 3:59:00of project management are being a
- 3:59:02diligent, respectful and caring steward.
- 3:59:05Creating a collaborative project team
- 3:59:07environment. Effectively engaging with
- 3:59:09stakeholders. Focusing on value.
- 3:59:12Recognizing, evaluating, and responding
- 3:59:15to system interactions. Demonstrating
- 3:59:18leadership behaviors. Tailoring based on
- 3:59:20the context. Building quality into
- 3:59:23processes and deliverables. Navigating
- 3:59:25complexity. Optimizing risk responses.
- 3:59:29Embracing adaptability and resiliency.
- 3:59:32and enabling change to achieve the
- 3:59:34envisioned future state. So the first
- 3:59:37principle is being a diligent,
- 3:59:39respectful and caring steward. And
- 3:59:42stewardship means being entrusted with
- 3:59:44the care of a project. It includes
- 3:59:46responsibilities within and external to
- 3:59:49an organization. Stewardship also
- 3:59:52includes upholding ethics and values. An
- 3:59:55effective project manager must perform
- 3:59:58their duty with certain qualities which
- 4:00:00include integrity, care,
- 4:00:02trustworthiness, and compliance.
- 4:00:04Stewards show an extensive commitment to
- 4:00:06a project's financial, social, and
- 4:00:09environmental aspects. The second
- 4:00:12principle is creating a collaborative
- 4:00:14project team environment. A project team
- 4:00:17consists of individuals with diverse
- 4:00:19skills, knowledge, and experience. And
- 4:00:22establishing a culture of respect and
- 4:00:24collaboration is essential to accomplish
- 4:00:27objectives effectively and efficiently.
- 4:00:30Team learning and development should be
- 4:00:32encouraged, which leads to increased
- 4:00:34innovation and efficiency. Everyone
- 4:00:37involved in a project contributes to
- 4:00:40achieving the desired outcomes and this
- 4:00:42helps create a sense of ownership and
- 4:00:44commitment among team members. The third
- 4:00:48principle is effectively engaging with
- 4:00:50stakeholders. A stakeholder is someone
- 4:00:53who may affect or be affected by the
- 4:00:55project. Recognize how stakeholders
- 4:00:58affect a project, its performance, and
- 4:01:00the results. involve them in an
- 4:01:03effective manner and to the extent
- 4:01:04necessary to contribute to achieving
- 4:01:07project goals and customer satisfaction.
- 4:01:10Now the fourth principle is focusing on
- 4:01:13value. Value is the ultimate indicator
- 4:01:16of project success and it can be
- 4:01:18financial or non-financial like goodwill
- 4:01:21or social benefits. It can be generated
- 4:01:24in the course of project execution at
- 4:01:27its conclusion or after it is finished.
- 4:01:30Ensure project benefits are attained by
- 4:01:33defining the project value, working
- 4:01:35together, and ensuring the team's
- 4:01:37success. The fifth principle is
- 4:01:40recognizing, evaluating, and responding
- 4:01:42to system interactions. A project team
- 4:01:45must recognize the project as a system.
- 4:01:48And like a system, a project has various
- 4:01:51independent and interacting components.
- 4:01:54Systems are ever evolving and need
- 4:01:57constant attention to both internal and
- 4:01:59external circumstances.
- 4:02:01Positive outcomes should be facilitated
- 4:02:03through responsiveness and teamwork. The
- 4:02:07sixth principle is demonstrating
- 4:02:09leadership behaviors. A project can be
- 4:02:12successful if the leadership
- 4:02:13demonstrates vision, innovation,
- 4:02:16motivation and empathy. And any member
- 4:02:18of a project team can demonstrate
- 4:02:20leadership behavior. An effective leader
- 4:02:23has certain qualities and these include
- 4:02:26recognizing differences in motivation
- 4:02:28among team members and projects,
- 4:02:31accepting responsibility for outcomes,
- 4:02:34showing respect and fairness to other
- 4:02:36team members, and maintaining integrity
- 4:02:39and honesty at work. The seventh
- 4:02:41principle is tailoring based on context.
- 4:02:45Each project is unique and the key to a
- 4:02:48project success is its ability to adapt
- 4:02:51to unique contexts and identify the most
- 4:02:53effective means of achieving the desired
- 4:02:56results. It results in enhanced
- 4:02:58innovation, efficiency and productivity.
- 4:03:02Now the next principle is building
- 4:03:04quality into processes and deliverables.
- 4:03:07Project quality involves satisfying
- 4:03:10stakeholders expectations and meeting
- 4:03:12project requirements. Project
- 4:03:14deliverables should comply with the
- 4:03:16need, application and acceptability
- 4:03:19standards established by the key
- 4:03:21stakeholders to attain the required
- 4:03:23quality. Appropriate and effective
- 4:03:25project processes must be implemented.
- 4:03:29Another important project management
- 4:03:31principle is navigating complexity. It
- 4:03:34means a project manager must modify
- 4:03:36their management approach based on the
- 4:03:38project's complexity level. And
- 4:03:40complexity in project management can
- 4:03:43arise from a number of factors including
- 4:03:45human behavior, system behavior,
- 4:03:48ambiguity and uncertainty and digital
- 4:03:51transformation.
- 4:03:52Project complexity must be continuously
- 4:03:55evaluated and managed to complete the
- 4:03:58project life cycle. The 10th project
- 4:04:01management principle is optimizing risk
- 4:04:03responses. Risk is an uncertain future
- 4:04:06event that can affect a project
- 4:04:08positively or negatively. Risk
- 4:04:11management should involve a balance
- 4:04:13between risk appetite and thresholds.
- 4:04:16Risk appetite is the degree of risk a
- 4:04:18company is ready to take or suffers to
- 4:04:21achieve its goals. Risk thresholds are
- 4:04:24specific levels or points at which a
- 4:04:26risk becomes unacceptable and requires a
- 4:04:29response. When developing risk
- 4:04:31management strategies, it is important
- 4:04:34to consider an organization's risk
- 4:04:36appetite and risk thresholds to ensure
- 4:04:38that risk responses are appropriate.
- 4:04:42Next, embracing adaptability and
- 4:04:44resiliency is the 11th principle of
- 4:04:47project management. Despite careful
- 4:04:49planning, unexpected events and changes
- 4:04:52may occur during a project's life cycle.
- 4:04:55Adaptability means being able to adjust
- 4:04:57to changing circumstances and
- 4:04:59requirements. And resiliency means the
- 4:05:02ability to recover quickly from
- 4:05:04setbacks, challenges, and failures. So
- 4:05:07in project management, resiliency means
- 4:05:10the ability to respond to unexpected
- 4:05:12events and continue moving forward. A
- 4:05:15project manager must create backup
- 4:05:18plans, communicate effectively with
- 4:05:20stakeholders, and maintain flexibility
- 4:05:23throughout the project's life cycle in
- 4:05:25order to incorporate adaption and
- 4:05:27resiliency in project management.
- 4:05:30Finally, the last principle is enabling
- 4:05:33change to achieve the envisioned future
- 4:05:35state. Every project aims to bring about
- 4:05:37the change necessary for an organization
- 4:05:40to achieve its objectives. Change may be
- 4:05:43challenging though and resistance to
- 4:05:45change can be a serious obstacle to a
- 4:05:47project success. A project manager can
- 4:05:50help achieve the organization's goal and
- 4:05:53build a better future state by
- 4:05:55facilitating change. And this requires a
- 4:05:57combination of strong leadership,
- 4:06:00effective communication, and commitment
- 4:06:02to continuous improvement.
- 4:06:05In this video, you learned that project
- 4:06:07management principles are the
- 4:06:09fundamental concepts, practices, and
- 4:06:12techniques that guide the effective
- 4:06:14management of projects. And the pinach
- 4:06:16defines 12 principles of project
- 4:06:19management.
- 4:06:22[Music]
- 4:06:30Welcome to expert viewpoints principles
- 4:06:33of project management. In this video, we
- 4:06:36will hear from project managers
- 4:06:37discussing the 12 principles of project
- 4:06:39management.
- 4:06:41Which of the 12 principles in your
- 4:06:43opinion is most critical and why?
- 4:06:47Adaptability and resiliency is by far
- 4:06:50the most critical of the 12 principles
- 4:06:53in my opinion. No matter how much you
- 4:06:55plan, surprises will always always pop
- 4:06:58up. There could be a major product bug.
- 4:07:01Your client has a large volume of
- 4:07:03feedback um that comes last minute that
- 4:07:05you weren't expecting. Maybe your
- 4:07:07creative producer is suddenly out sick
- 4:07:09for a week. In these stressful
- 4:07:11situations, your team is likely going to
- 4:07:14have an emotional reaction. But it's the
- 4:07:16role of the project manager to stay
- 4:07:18calm, reach out to the proper
- 4:07:21stakeholders, and lead the charge on
- 4:07:23brainstorming solutions. The project
- 4:07:25team should have full confidence that
- 4:07:28the project manager will communicate the
- 4:07:30new plan through the correct channels at
- 4:07:32the right times. This puts the whole
- 4:07:34team at ease and frees them up so they
- 4:07:36can focus on immediate tasks.
- 4:07:39So, first let's address the obvious
- 4:07:41answer. All 12 of the principles are
- 4:07:44important. However, in the interest of
- 4:07:46time and brevity, let me choose the two
- 4:07:49in my opinion from the 12 that really
- 4:07:52stand out.
- 4:07:54Number one, be a diligent, respectful,
- 4:07:57and caring steward. H stewardship
- 4:08:01involves acting with integrity, caring
- 4:08:04for the team, being trustworthy, and
- 4:08:07complying with organizational standards.
- 4:08:10A project manager needs to strive for
- 4:08:12service before self. If this does not
- 4:08:15happen, the team will lack trust,
- 4:08:17confidence, and team continuity, and
- 4:08:20effectiveness will ultimately suffer.
- 4:08:23Secondly, create a collaborative team
- 4:08:26environment. Projects are not solely
- 4:08:29delivered by the project manager alone.
- 4:08:31They are delivered by a team. The team
- 4:08:35needs to work within organizational and
- 4:08:38professional guidelines to develop their
- 4:08:40own culture. I would absolutely say a
- 4:08:43team is the most critical within the 12
- 4:08:45principles. Without a team, you don't
- 4:08:48have a project. I'm going to give an
- 4:08:50example of a recent project that I had
- 4:08:53over the last couple years. We had a
- 4:08:56great team. There was definitely some
- 4:08:58team building opportunities in there and
- 4:09:01I had a section of the overall program
- 4:09:04with that. I was still very new to this
- 4:09:07type of product and we had a lot of new
- 4:09:09people involved. We didn't know exactly
- 4:09:11everything that was needed. However, we
- 4:09:14did have a team constraint. We didn't
- 4:09:16know that at the very beginning until
- 4:09:18much later on when we ended up me
- 4:09:21missing a milestone. And unfortunately,
- 4:09:23I really don't like failing. I'm sure
- 4:09:26nobody else really does either. But we
- 4:09:28had the opportunity to take it as a
- 4:09:30lesson to learn, especially since it was
- 4:09:32the very beginning of that project.
- 4:09:34Again, without a team, you don't have a
- 4:09:36project.
- 4:09:38Is there anything you would add for the
- 4:09:4012 principles? I would add training. I
- 4:09:44find education to be extremely
- 4:09:46important, especially in any sort of
- 4:09:49circumstances. Whether it's a job,
- 4:09:52outside of work, you want to know as
- 4:09:54much as possible so you can easily speak
- 4:09:56to it and take quick action when needed.
- 4:10:01>> I think the 12 principles as written are
- 4:10:04highly effective and very comprehensive.
- 4:10:07But if I were to add a 13th, I would
- 4:10:10likely add a new principle to show
- 4:10:13courage and conviction. Not every
- 4:10:16project is perfect. Create an
- 4:10:18environment where stakeholders invite
- 4:10:21what we refer to as functional or good
- 4:10:24conflict. Disagree when something
- 4:10:27doesn't seem right. Ask questions. Share
- 4:10:30opinions openly. Have the discussion. A
- 4:10:34fear of open conflict may leave critical
- 4:10:37inputs not shared. These inputs may be
- 4:10:40the difference between project success
- 4:10:43and project failure.
- 4:10:46I wouldn't add anything to the PMI 12
- 4:10:48principles, but I'd perhaps modify the
- 4:10:51principle of leadership to servant
- 4:10:53leadership. Project managers should put
- 4:10:55their egos to the side and find ways to
- 4:10:57serve the team. And that can take many
- 4:11:00forms. Um, maybe it's taking the extra
- 4:11:02time to talk to a frustrated project
- 4:11:04team member and show them empathy. Maybe
- 4:11:07it's delivering bad news to a client
- 4:11:09instead of your teammate that just
- 4:11:11worked a long shift to try to solve a
- 4:11:13problem.
- 4:11:15It could look like maybe encouraging a
- 4:11:17quieter teammate to share their opinion
- 4:11:19in a meeting. And my favorite of all is
- 4:11:22celebrating the success of others with
- 4:11:24leadership. Project managers are witness
- 4:11:27to a lot of incredible work that leaders
- 4:11:29miss because they're just so busy. Take
- 4:11:31an extra 5 minutes and write a quick
- 4:11:33email and brag about others. Your team
- 4:11:36will be so happy you did.
- 4:11:39I have a lot of examples of when one or
- 4:11:41more of the 12 principles of project
- 4:11:43management have not been adhered to. I
- 4:11:46think there's a combination of two
- 4:11:48principles that when they're not met
- 4:11:50really leads to a negative experience.
- 4:11:52And that's when there's poor leadership
- 4:11:54and when there's poor stakeholder
- 4:11:56management. And both of them you'll see
- 4:11:59start bubbling up to the top as an
- 4:12:01issue. If you have a poor communication
- 4:12:03plan or are a poor communicator as the
- 4:12:06project lead without clear
- 4:12:08communication, you're not going to be a
- 4:12:10good leader and you're not going to have
- 4:12:11good stakeholder management. And the
- 4:12:13minute your stakeholders are not behind
- 4:12:15you on the project, whether they're
- 4:12:17internal, external, or part of your
- 4:12:19project team, the work isn't going to
- 4:12:21get done in the way that you you desire
- 4:12:24it to be done. Again, I'm going to turn
- 4:12:26to case studies that are well documented
- 4:12:29in the Project Management Institute,
- 4:12:32wwpmi.org.
- 4:12:36The city of Montreal was awarded the
- 4:12:38honor of hosting the 1976 Olympics. They
- 4:12:42set out to build a model set of
- 4:12:45facilities to support this special
- 4:12:47event. Unfortunately, the original and
- 4:12:50schedule and the original budget were
- 4:12:53not met. Many planned facilities were
- 4:12:56not ready or incomplete when the games
- 4:12:58began. The original budget of 160
- 4:13:02million ultimately ended up costing over
- 4:13:06430 million.
- 4:13:08Every one of the 12 project principles
- 4:13:12were not adhered to. Let me go ahead and
- 4:13:15share two examples.
- 4:13:17Number one, the mayor of Montreal
- 4:13:20assumed project management
- 4:13:21responsibilities.
- 4:13:23He misrepresented the facts of the
- 4:13:25project, did not follow proven
- 4:13:27contracting guidelines, made deals
- 4:13:30behind the scene, and ultimately lost
- 4:13:33the trust of the team and city as a
- 4:13:36whole. This mayor was a poor steward.
- 4:13:40Secondly, the mayor also acted
- 4:13:42unilaterally and virtually did his own
- 4:13:45thing. Team communications were not
- 4:13:48effective. The team had no clear
- 4:13:51direction.
- 4:13:52Contributions to solve design problems
- 4:13:55were totally ignored and the overall
- 4:13:58culture of the project was costic at
- 4:14:00best. The mayor failed to create a
- 4:14:03collaborative team environment.
- 4:14:08[Music]
- 4:14:16Welcome to project management in a
- 4:14:18virtual environment. After watching this
- 4:14:21video, you will be able to describe a
- 4:14:24virtual team, discuss the pros and cons
- 4:14:26of a virtual team, and explain how to
- 4:14:29effectively manage virtual teams. The
- 4:14:32Project Management Institute or PMI
- 4:14:35states that a project manager needs to
- 4:14:38plan communications carefully to realize
- 4:14:40virtual team advantages and avoid the
- 4:14:43disadvantages. But first, what is a
- 4:14:46virtual team? A virtual team is a group
- 4:14:49of people who work together on a project
- 4:14:51but are geographically dispersed and
- 4:14:53communicate using digital tools. The PMI
- 4:14:57recognizes four main advantages of a
- 4:15:00virtual team. A virtual team helps
- 4:15:02leverage special expertise from multiple
- 4:15:05locations. As members may be employed
- 4:15:07anywhere, the limitation of using only
- 4:15:10the local talent pool is removed. A
- 4:15:12virtual team incorporates employees
- 4:15:14working from home. And this also allows
- 4:15:17more opportunities for working with
- 4:15:19employees with disabilities or mobility
- 4:15:22issues. Such a team can also employ
- 4:15:24those unable to travel to the workplace.
- 4:15:27A virtual team can also help reduce the
- 4:15:30price of office space, travel, and other
- 4:15:32overhead expenditures that a physical
- 4:15:34workplace has to bear. So, what are some
- 4:15:38of the disadvantages of a virtual team?
- 4:15:41A virtual team depends on the internet
- 4:15:43and a computer to accomplish their work.
- 4:15:46Due to this, technology related problems
- 4:15:48might prevent employees from working
- 4:15:50from home till the problem is fixed.
- 4:15:52Because of different time zones, virtual
- 4:15:55teams may face challenges in
- 4:15:56communication and be deprived of
- 4:15:59face-toface interactions. Virtual teams
- 4:16:02may also struggle with cultural and
- 4:16:04language differences in addition to
- 4:16:06different work styles. Also, individuals
- 4:16:09may feel lonely and isolated while
- 4:16:12working in virtual worlds and develop
- 4:16:14trust issues. Managing a virtual team
- 4:16:17requires a unique set of abilities. A
- 4:16:20project manager must be aware of the
- 4:16:22pitfalls to avoid and the proactive
- 4:16:25steps to take. Let's discuss some
- 4:16:27important points to effectively manage
- 4:16:29virtual teams. Projects where
- 4:16:32geographically dispersed teams adversely
- 4:16:35impact project management should be
- 4:16:37avoided. A virtual team's effectiveness
- 4:16:40is also less likely to increase due to
- 4:16:42project complexity. Ensure thorough
- 4:16:45preparation to mitigate these built-in
- 4:16:47risks. Create a culture of trust by
- 4:16:50building relationships with team members
- 4:16:52and encouraging collaboration. Team
- 4:16:55members should be encouraged to share
- 4:16:57their ideas and feedback openly. Train
- 4:17:00your employees and invest in technology.
- 4:17:03Provide your team members with the
- 4:17:05resources and tools they need to operate
- 4:17:08efficiently. Also provide assistance and
- 4:17:11training for utilizing project
- 4:17:12management software effectively and
- 4:17:15ensure that real time support is
- 4:17:17available for virtual team members if
- 4:17:19they encounter problems. Being
- 4:17:22consistently accessible to the team is
- 4:17:24necessary for a project manager to
- 4:17:26provide a source of guidance and
- 4:17:28leadership. Here's a few more important
- 4:17:31points. Be inclusive. Regularly provide
- 4:17:35information and updates to your virtual
- 4:17:37team members to overcome any possible
- 4:17:40feelings of isolation. Define the
- 4:17:42project's vision. Ensure each team
- 4:17:45member is aware of the objectives and
- 4:17:47advantages of the project. Develop a
- 4:17:50team charter outlining the purpose,
- 4:17:52goals, roles, responsibilities, and
- 4:17:55expectations of a team. Ensure roles and
- 4:17:58responsibilities are clearly defined and
- 4:18:00communicated. Leave no questions
- 4:18:03unanswered. Finally, note that a virtual
- 4:18:06teamwork environment requires people to
- 4:18:08be self-sufficient and self-motivated
- 4:18:11with the support of their virtual team
- 4:18:13managers. When building your teams,
- 4:18:16ensure you hire those who can work and
- 4:18:18thrive in a remote work setup.
- 4:18:22In this video, you learned that a
- 4:18:24virtual team is a group of people who
- 4:18:26work together on a project but are
- 4:18:28geographically dispersed and communicate
- 4:18:31using digital tools. The advantages of a
- 4:18:34virtual team include expertise from
- 4:18:36multiple locations, employees working
- 4:18:39from home, including employees with
- 4:18:41disabilities, and saving travel and
- 4:18:44office expenses. The disadvantages of a
- 4:18:47virtual team include limited technology
- 4:18:49available, time zones, cultural and
- 4:18:52language difficulties, and employees
- 4:18:54feeling isolated. And several ways to
- 4:18:57effectively manage virtual teams include
- 4:19:00building trust across the virtual team,
- 4:19:03investing in technology and training,
- 4:19:05being inclusive, and more.
- 4:19:10[Music]
- 4:19:18Welcome to effective meeting management.
- 4:19:21After watching this video, you will be
- 4:19:23able to organize and lead effective
- 4:19:26meetings, summarize when meetings are
- 4:19:28required, and explain the 12 key success
- 4:19:31factors of effective meeting management.
- 4:19:34Meetings are part of everyday project
- 4:19:36management. And meetings may be formal,
- 4:19:39informal, face-toface, virtual, planned,
- 4:19:42or impromptu. And effective meetings are
- 4:19:45a critical tool project managers use to
- 4:19:48engage the project team and
- 4:19:49stakeholders, relay information, solve
- 4:19:52problems, make decisions, and more.
- 4:19:54According to the Project Management
- 4:19:57Institute or PMI, meetings are a primary
- 4:20:00means of communication throughout a
- 4:20:02project and using best practices in
- 4:20:05meeting management helps a project
- 4:20:06manager be more successful. Now, project
- 4:20:10managers may need to facilitate several
- 4:20:12types of meetings depending on the
- 4:20:14environment. Several common meeting
- 4:20:16types exist in a traditional waterfall
- 4:20:19or predictive life cycle environment.
- 4:20:22Pre-baseline and baseline presentations,
- 4:20:25kickoff meetings to gain stakeholder
- 4:20:27acceptance, periodic status meetings,
- 4:20:30change management meetings, requirement
- 4:20:32solicitation and analysis meetings,
- 4:20:34bidder conferences, and closeout and
- 4:20:37lessons learned. In an agile or adaptive
- 4:20:41environment, a project manager may
- 4:20:43oversee these following meetings.
- 4:20:45Customer requirement meetings, product
- 4:20:47backlog refinement, sprint or iteration
- 4:20:50planning, daily stand-up meetings,
- 4:20:53sprint or iteration reviews, and
- 4:20:55retrospectives.
- 4:20:57Many managers schedule meetings when
- 4:20:59they are not required, and some actions
- 4:21:02and communications do not require a
- 4:21:04formal meeting. The project manager must
- 4:21:07know when a meeting is the best
- 4:21:09communication choice. Here are a few
- 4:21:12examples of when the manager should
- 4:21:14schedule a meeting, when the information
- 4:21:17is complex, when the team is generating
- 4:21:20ideas, or the team needs to reach
- 4:21:22consensus and agree to commitments.
- 4:21:25Also, when the team needs to make a
- 4:21:27decision, the manager wants to build a
- 4:21:29team or when many stakeholders are part
- 4:21:32of the project. So meetings are both a
- 4:21:35science and an art and a productive
- 4:21:38meeting can move a project forward while
- 4:21:40an unproductive meeting can impact the
- 4:21:43project negatively. Here are 12 key
- 4:21:46factors to meeting success every project
- 4:21:48manager should consider. Always have a
- 4:21:51measurable outcome. Each meeting should
- 4:21:54have a quantifiable goal that all
- 4:21:56attendees understand. Develop and share
- 4:21:59an agenda. And this can be a simple
- 4:22:01overview of topics in a meeting invite
- 4:22:03or a formal document. Send the agenda
- 4:22:06out 48 hours in advance. If the agenda
- 4:22:09had been sent out earlier, it would not
- 4:22:11have become a priority for attendees to
- 4:22:14read and review immediately.
- 4:22:16Participants may have limited
- 4:22:18preparation time if the agenda is sent
- 4:22:20out later. Communicate the meeting
- 4:22:23purpose. Ensure all participants
- 4:22:25understand the purpose and why they must
- 4:22:28attend the meeting. Share materials and
- 4:22:31pre-work. This goes handinand with
- 4:22:33developing and sharing an agenda. Let
- 4:22:36participants know preparation
- 4:22:38expectations and allow 48 hours before
- 4:22:41the meeting to prepare. Be inclusive.
- 4:22:44Try to delegate some meeting topics to
- 4:22:46others. Participants will be more
- 4:22:48committed if they have accountability
- 4:22:50for the presentation and results. Use a
- 4:22:54parking lot. Document off-topic
- 4:22:56discussions on a whiteboard. Be polite
- 4:22:59and let the stakeholder know this topic
- 4:23:01and that a plan for follow-up
- 4:23:03discussions will be addressed at the end
- 4:23:05of the meeting. Next, enlist the support
- 4:23:08of a notetaker. The facilitator should
- 4:23:11not be responsible for taking notes, but
- 4:23:13should focus on the stakeholders. Ask a
- 4:23:16team member to take notes and work
- 4:23:18together after the meeting to review
- 4:23:20them. Assign owners to action items.
- 4:23:23Always summarize agreements and
- 4:23:25commitments. Review them and ensure
- 4:23:28stakeholders understand the next steps.
- 4:23:31Practice nonattribution.
- 4:23:33Create an environment where stakeholders
- 4:23:35feel comfortable discussing the project
- 4:23:38openly, including opinions that may
- 4:23:40conflict with others. The facilitator
- 4:23:43must control conflict to ensure it
- 4:23:45remains functional or productive.
- 4:23:48Publish the notes or minutes. Document
- 4:23:50and distribute meeting minutes within 24
- 4:23:53hours of the meeting conclusion. And
- 4:23:55this will reduce the risk of
- 4:23:57stakeholders not recalling commitments
- 4:23:59made during the meeting. And finally,
- 4:24:02end early if the meeting objectives are
- 4:24:05met. Meet for purpose, not for time.
- 4:24:09In this video, you learned that meetings
- 4:24:12are a critical tool a project manager
- 4:24:14uses to engage the project team and
- 4:24:17stakeholders, relay information, solve
- 4:24:19problems, make decisions, and more. Some
- 4:24:23communications do not require a formal
- 4:24:25meeting. And 12 factors to meeting
- 4:24:28success include having measurable
- 4:24:31outcomes. Sharing an agenda, sending the
- 4:24:34agenda 48 hours before the meeting,
- 4:24:37communicating the purpose of the
- 4:24:38meeting, sharing materials and pre-work
- 4:24:4148 hours before the meeting. Being
- 4:24:44inclusive and delegating meeting topics
- 4:24:46to others. Using a parking lot to park
- 4:24:49off-topic discussions until the end of
- 4:24:51the meeting. Assigning a notetaker.
- 4:24:54Assigning owners to action items.
- 4:24:57Practicing non-attribution to resolve
- 4:24:59conflict. Publishing the minutes within
- 4:25:0224 hours of the meeting. And meeting for
- 4:25:05a purpose, not for time.
- 4:25:10[Music]
- 4:25:17[Music]
- 4:25:20Welcome to influencing for results part
- 4:25:22one. After watching this video, you will
- 4:25:25be able to describe effective
- 4:25:27influencing skills and summarize common
- 4:25:30aspects essential to team development.
- 4:25:33Effective influencing abilities are the
- 4:25:36abilities and behaviors that allow
- 4:25:38individuals to convince and encourage
- 4:25:40others to follow a desired course of
- 4:25:42action. And there are seven influencing
- 4:25:45abilities that are important for project
- 4:25:47managers to master. Provide members with
- 4:25:50a reason to be self-motivated.
- 4:25:52Stakeholders are often driven by
- 4:25:54success, allegiance, power, or a mix of
- 4:25:57these factors. Help to recognize and
- 4:26:00resolve conflicts between stakeholders.
- 4:26:03Effective influencing helps to reach
- 4:26:05agreements by understanding the needs of
- 4:26:07both parties. Collaborate with team
- 4:26:09members to make effective decisions.
- 4:26:12Make sure everyone has an opportunity to
- 4:26:14contribute and that buyin is achieved.
- 4:26:17Next, to be self-aware and responsible
- 4:26:20for your actions and emotions. By
- 4:26:23managing oneself effectively, one
- 4:26:25becomes more socially aware, has better
- 4:26:27relationships, and performs better as a
- 4:26:30team. Adapt leadership approaches to the
- 4:26:33demands of the stakeholders. And this
- 4:26:35includes developing connections,
- 4:26:37expressing empathy, and showing a
- 4:26:39genuine interest in others opinions.
- 4:26:42Recognize the diverse communication
- 4:26:44preferences of important stakeholders
- 4:26:46and adapt communications as applicable.
- 4:26:49And finally, manage and share change.
- 4:26:52Project managers must be able to convey
- 4:26:54to stakeholders the advantages of
- 4:26:56change, negotiate the resistance to
- 4:26:59change, and guide stakeholders through
- 4:27:01the transition process. Now the project
- 4:27:04management institute or PMI recommends
- 4:27:07five common aspects essential to team
- 4:27:10development. Everyone in the team must
- 4:27:12be aware of the vision and objectives of
- 4:27:15the project to ensure that everyone is
- 4:27:17on the same page and working towards a
- 4:27:20common goal. Value added vision is
- 4:27:22attained by team commitment and is
- 4:27:25crucial for success of the project.
- 4:27:28Roles and duties should be specified
- 4:27:30early on in the project so that the team
- 4:27:32is committed to and aware of their
- 4:27:34responsibilities. Any training or skill
- 4:27:37gaps should be filled. Project team
- 4:27:40operations are the activities used to
- 4:27:42oversee a team carrying out a project.
- 4:27:45The important aspects of project team
- 4:27:47operations include team formation,
- 4:27:50project planning, and monitoring and
- 4:27:52control. The PMI suggests creating a
- 4:27:55team charter to establish ground rules
- 4:27:58and conventions that direct the team.
- 4:28:01Provide guidance to members whenever
- 4:28:03they need it. The management strategy
- 4:28:05known as management by wandering about
- 4:28:08or MBWA involves the manager spending
- 4:28:11time talking to and watching the
- 4:28:13employees while they are at work.
- 4:28:16Finally, feedback is crucial to growth.
- 4:28:19Discuss what works well and what needs
- 4:28:21improvement. Set goals while cooperating
- 4:28:24with the team and team members should
- 4:28:26get the chance to develop their talents.
- 4:28:29In this video, you learned that
- 4:28:31effective influencing abilities and
- 4:28:33behaviors allow individuals to convince
- 4:28:36and encourage others to follow a desired
- 4:28:39course of action. And five common
- 4:28:41aspects essential to team development
- 4:28:43include objective awareness, early role
- 4:28:46assignments, project team operations,
- 4:28:49guidance, and feedback.
- 4:28:54[Music]
- 4:29:02Welcome to influencing for results part
- 4:29:04two. After watching this video, you will
- 4:29:07be able to explain different models to
- 4:29:10motivate others. The project management
- 4:29:13institute or PMI has defined several
- 4:29:16methods for effectively influencing
- 4:29:18stakeholders. The common models
- 4:29:20discussed here are theory XYZ, the
- 4:29:23sevenstep team performance model and the
- 4:29:26influence diagram. The first model is
- 4:29:29theories X, Y, and Z. These are three
- 4:29:31different approaches to understanding
- 4:29:33employee motivation and management
- 4:29:35styles which can impact effective
- 4:29:38influencing.
- 4:29:39Theory X was proposed by Douglas
- 4:29:41McGregor and this theory assumes that
- 4:29:44employees are motivated primarily by
- 4:29:46self-interest which is essentially a
- 4:29:48desire to increase earnings with the
- 4:29:50least amount of work. Therefore,
- 4:29:53managers use financial incentives and
- 4:29:55punishments as the primary drivers of
- 4:29:57employee behavior. Such team members can
- 4:30:00be influenced by using a hands-on and
- 4:30:03top-down management approach. Theory Y
- 4:30:06which was also proposed by Douglas
- 4:30:08McGregor says employees generally want
- 4:30:11to work enjoy their jobs and are
- 4:30:13innovative and creative. Such team
- 4:30:16members can be influenced by using a
- 4:30:18personal coaching style. It also
- 4:30:20encourages discussion and innovation and
- 4:30:23helps to create a positive work
- 4:30:25environment. And theory Z assumes that
- 4:30:28employees are motivated by a sense of
- 4:30:30community and a shared sense of purpose.
- 4:30:33If a manager holds a theory Z mindset,
- 4:30:36he is more likely to prioritize team
- 4:30:39building, collaboration, and open
- 4:30:41communication to influence the
- 4:30:43employees. This effective approach can
- 4:30:45create a strong sense of connection and
- 4:30:48commitment to the organization.
- 4:30:50Next, the Drexler Civot team performance
- 4:30:53model or sevenstep team performance
- 4:30:55model is a framework that describes the
- 4:30:58stages of team development and provides
- 4:31:00instructions on how to proceed through
- 4:31:02each phase successfully. This model has
- 4:31:05seven stages that are divided into two
- 4:31:08groups, creating stages and sustaining
- 4:31:11stages. The creating stages include the
- 4:31:14four initial stages of group development
- 4:31:17and they focus on establishing the
- 4:31:19team's purpose, building relationships
- 4:31:21and clarifying goals. They are
- 4:31:24orientation, trust building, goal
- 4:31:26clarification and commitment. The
- 4:31:29sustaining stages start after the group
- 4:31:32has adjusted and established itself.
- 4:31:34During this stage, they identify and
- 4:31:37share actions for enhancing
- 4:31:38sustainability and performance in the
- 4:31:41team. And these last three steps include
- 4:31:44implementation, high performance, and
- 4:31:46renewal. So the first step, orientation,
- 4:31:50answers the question, why am I here? The
- 4:31:53team needs to understand its purpose and
- 4:31:56what being a member means. The second
- 4:31:58step is the trust building stage. It
- 4:32:01answers questions related to who team
- 4:32:04members work together to create trust
- 4:32:06and establish open communication. They
- 4:32:09learn about each other's strengths and
- 4:32:11weaknesses and begin to rely on one
- 4:32:14another to achieve goals. The third step
- 4:32:17answers the question, "What are we
- 4:32:19doing?" and gives goal clarification.
- 4:32:22The team defines its goals and decides
- 4:32:24how it will evaluate success. The main
- 4:32:27focus is on setting clear and
- 4:32:29quantifiable goals based on the
- 4:32:31stakeholders expectations and
- 4:32:33requirements. The fourth step is
- 4:32:35commitment and it answers questions
- 4:32:38related to how will we do it. The team
- 4:32:40decides how exactly it will reach its
- 4:32:43objectives by discussing particular
- 4:32:45courses of action, deciding how to
- 4:32:47distribute resources and defining each
- 4:32:50member's responsibilities.
- 4:32:52Now the fifth step implementation
- 4:32:55involves sequencing and scheduling
- 4:32:57tasks. The team asks itself questions
- 4:33:00like who does what, when, and where. The
- 4:33:04team executes its plan and members work
- 4:33:06together to complete tasks and achieve
- 4:33:09goals. The next step is high
- 4:33:12performance. A team enters the high
- 4:33:14performance stage when it has mastered
- 4:33:16its operations and can adapt to changes
- 4:33:19and achieve its objectives. Now the team
- 4:33:22members work together and require
- 4:33:24minimal oversight and there is a sense
- 4:33:27of shared ownership and accountability
- 4:33:29for achieving goals. The seventh and
- 4:33:32final step of the sevenstep team
- 4:33:34performance model is renewal. As the
- 4:33:36team reaches the end of its journey,
- 4:33:38they reflect on their accomplishments
- 4:33:40and learn from their experiences. Team
- 4:33:43cohesion is evaluated at this stage and
- 4:33:46required changes are made and new
- 4:33:48members could also be employed.
- 4:33:51Now the third model is the influence
- 4:33:53diagram. This diagram is a graphical
- 4:33:56representation of the factors involved
- 4:33:58in making decisions. It represents and
- 4:34:01analyzes the factors that motivate or
- 4:34:04demotivate decisionm and the diagram can
- 4:34:07be used by a team or individually. An
- 4:34:10influence diagram shows the factors for
- 4:34:13increasing and reducing influence.
- 4:34:16Factors that reduce influence are poor
- 4:34:18communications, poor issues management,
- 4:34:21limited growth opportunities, and lack
- 4:34:23of project vision. Factors that increase
- 4:34:26influence are building relationships,
- 4:34:29being accessible, building trust, and
- 4:34:32active listening. In this video, you
- 4:34:35learned that the PMI defines the
- 4:34:37following methods for influencing
- 4:34:39stakeholders. theory XYZ, the sevenstep
- 4:34:43team performance model and the influence
- 4:34:45diagram. Theory XYZ is made up of three
- 4:34:49approaches to understand employee
- 4:34:51motivation and management styles. The
- 4:34:54sevenstep team performance model is a
- 4:34:56framework that describes the stages of
- 4:34:58team development. And the influence
- 4:35:01diagram is a graphical representation of
- 4:35:03the factors involved in decisionm.
- 4:35:09[Music]
- 4:35:17Welcome to expert viewpoints developing
- 4:35:19and managing a team. In this video we
- 4:35:22will hear from project managers on how
- 4:35:24to effectively develop and manage a
- 4:35:26team.
- 4:35:28uh developing and managing a team um is
- 4:35:31a very complicated and involved process.
- 4:35:34Um I don't think I don't think there are
- 4:35:37any uh really quick answers to the
- 4:35:39question of how to do that effectively.
- 4:35:42I think there's some general guidelines
- 4:35:43that I've found effective in my career
- 4:35:46that you can help you develop and manage
- 4:35:48a team. Um the the first is is to really
- 4:35:52understand the people on the team and
- 4:35:54what their passions are and what their
- 4:35:56skills are. Um when I put a team
- 4:35:58together, I always try to um find, you
- 4:36:02know, what people are naturally good at,
- 4:36:04what they've been trained to be good at,
- 4:36:07and then what do they really care about?
- 4:36:08What do they really want to be doing?
- 4:36:09What do they really want to be working
- 4:36:11on? What do how do they want to conduct
- 4:36:13their their role at um the workplace or
- 4:36:16the job that they're doing? Sometimes a
- 4:36:18P person may join your team um and they
- 4:36:21may not be the right fit for the role
- 4:36:23that they had joined for. And as a
- 4:36:26person that's trying to develop that
- 4:36:27team, you're constantly looking at each
- 4:36:29individual and analyzing, is this person
- 4:36:32in the right role. Sometimes that may
- 4:36:34mean that a person needs to move to a
- 4:36:36different team and they don't they're
- 4:36:37not in your team anymore. Um, sometimes
- 4:36:40it may just be a little bit of training.
- 4:36:42They have the right dispositions, they
- 4:36:44have the right talent, they just need to
- 4:36:46get trained up on a specific area of
- 4:36:48your team. But constantly looking at how
- 4:36:51to uh develop your your folks, your your
- 4:36:54people in a way that's good for them
- 4:36:56will help them be better for the
- 4:36:58organization and for the projects that
- 4:37:00they're actually working on. Um, another
- 4:37:04uh thing that I found over the years
- 4:37:05that has been really effective is to
- 4:37:08make sure that you don't treat work like
- 4:37:11it's not work. Um I see a lot of uh
- 4:37:14managers that try to make work a
- 4:37:17person's life um rather than a important
- 4:37:20be important aspect but just an aspect
- 4:37:22of their life and the one thing that is
- 4:37:25consistently important is leading by
- 4:37:29example.
- 4:37:31Teams want to know that they can believe
- 4:37:33in the leader. Now the team wants to
- 4:37:35know you have their back
- 4:37:37and they want to know that their
- 4:37:39creativity, their ideas, their input is
- 4:37:42valued. They have to feel that their
- 4:37:44work is valued.
- 4:37:46And this helps build teams and allow
- 4:37:49them to go through that whole team
- 4:37:51building process of forming,
- 4:37:55storming, norming, performing. And you
- 4:37:58have to let that play out naturally.
- 4:38:02I think I can. A dispersed team was
- 4:38:06tasked to document and improve a
- 4:38:08critical finance project at a major
- 4:38:11wireless company. The project was
- 4:38:14chaotic to say the least. There was poor
- 4:38:16communications. Everyone did things in a
- 4:38:20way that was comfortable for them and
- 4:38:23respect and collaboration for one
- 4:38:25another was quite minimal.
- 4:38:28The project manager called the team
- 4:38:30together to discuss the dysfunctionality
- 4:38:33of this team. Common ground rules and
- 4:38:36norms were established and the entire
- 4:38:39team agreed to abide by them. More
- 4:38:43importantly,
- 4:38:44the team not only committed to these
- 4:38:47behavioral rules but were willing to
- 4:38:50hold others accountable to them as well.
- 4:38:54The result of this meeting was creation
- 4:38:56of a team charter that guided behavior
- 4:39:00throughout the project and turned a
- 4:39:03potential disaster into an amazing
- 4:39:06success.
- 4:39:08Uh, a team building activity that I
- 4:39:11participated in that was really fun and
- 4:39:14I think really brought the team together
- 4:39:16was a couple years ago. Um there were
- 4:39:19about 12 people involved in the project
- 4:39:21or in the event and the goal was to
- 4:39:25align ourselves next to each other, some
- 4:39:28people on the left, some people on the
- 4:39:29right and place our hands in such a way
- 4:39:32that a shoot or think of it as a ski
- 4:39:34jump is created. So the first people in
- 4:39:38the line are standing up and the last
- 4:39:39people in the line are down on the
- 4:39:41floor. And so there's a chute that's
- 4:39:43created with their hands and a ball is
- 4:39:45run down the chute successfully.
- 4:39:48The team building part of it is 11 of
- 4:39:50the 12 people had to have their eyes
- 4:39:53closed and one of the 12 people could
- 4:39:56have their eyes open but they could not
- 4:39:58talk. So the 11 people with their eyes
- 4:40:00closed could talk. The one person with
- 4:40:02their eyes open could not talk. that
- 4:40:04person had to guide people to form the
- 4:40:07shoot um simply by placing them in the
- 4:40:10right spot through touch uh through I
- 4:40:13eye contact through looking and
- 4:40:15gesturing and things like that. The team
- 4:40:18building aspect of it came to be when
- 4:40:21the people who could speak but not hear
- 4:40:23figured out what it was that they were
- 4:40:24doing and then they could tell
- 4:40:26everybody, hey, this is what we're
- 4:40:28doing. were making this shoot and and
- 4:40:31for some reason cuz they didn't know
- 4:40:32about the ball and so they were able to
- 4:40:35help the person who could who did have
- 4:40:37their eyes open get everybody aligned
- 4:40:39properly so the ball could run down the
- 4:40:41shoot. It was a really fun event and it
- 4:40:43and it really showed how you can work
- 4:40:45differently with people to get the job
- 4:40:47done.
- 4:40:49>> That's a yes or no answer and the answer
- 4:40:51is yes with this caveat. Admittedly it
- 4:40:55is far more difficult. So, a couple of
- 4:40:58tips. Number one, do your best to get
- 4:41:00the team together for a nonwork-related
- 4:41:03virtual meeting where the cameras are on
- 4:41:06and the team shares a bit about
- 4:41:08themselves. Have an icebreaker. It
- 4:41:11doesn't have to be more than 15 or 30
- 4:41:13minutes, but this is an important event
- 4:41:16to bring the team together initially and
- 4:41:19hopefully build a little bit of trust.
- 4:41:21Secondly, apply what we shared in the
- 4:41:24previous question. Remember the team
- 4:41:26charter concept where we define norms
- 4:41:29and ground rules. A team charter is
- 4:41:32almost essential in a virtual
- 4:41:34environment. In particular, if you're
- 4:41:36bringing a team together and these team
- 4:41:38members have never worked together
- 4:41:40before. Finally, develop and implement a
- 4:41:44communications management plan. Why? To
- 4:41:47ensure communications is organized and
- 4:41:49agreed upon by all key stakeholders.
- 4:41:55I think it's entirely possible to build
- 4:41:57an effective team in a virtual
- 4:41:58environment. Um, obviously there's going
- 4:42:00to be a lot of differences uh from being
- 4:42:02in an office, but um I think a virtual
- 4:42:05environment can be very effective. Um,
- 4:42:08and you know, it probably goes without
- 4:42:10saying, but I think the tool sets and
- 4:42:11the tools that people use um in a
- 4:42:14virtual environment are a big part of
- 4:42:16whether that uh that team is going to be
- 4:42:18successful. I think the way that you can
- 4:42:20build an effective virtual team um is to
- 4:42:24ensure that that people that people
- 4:42:25working on the team have the right
- 4:42:27tools. You can have a really nice
- 4:42:29collaborative environment, but people
- 4:42:31may not know how to use the tools
- 4:42:32properly so that they can work
- 4:42:34collaboratively. So having the tools is
- 4:42:37important. Making sure people understand
- 4:42:39how to use those tools um is equally
- 4:42:42important.
- 4:42:45[Music]
- 4:42:53Welcome to leading change. After
- 4:42:55watching this video, you will be able to
- 4:42:58describe elements of change management
- 4:43:01and explain the three common change
- 4:43:03models. Change happens in all projects
- 4:43:06and it can affect systems, behaviors,
- 4:43:08activities, business requirements, and
- 4:43:11culture. The project manager and team
- 4:43:14must know how to manage change.
- 4:43:16According to the project management
- 4:43:18institute or PMI, change management
- 4:43:21consists of five interrelated elements
- 4:43:24including formulating change, planning
- 4:43:26change, implementing change, managing
- 4:43:29the transition, and sustaining change.
- 4:43:32The first element, formulating change,
- 4:43:35is where the project manager
- 4:43:36communicates the value and purpose of
- 4:43:39the change. The project manager explains
- 4:43:41how the improvement will transform the
- 4:43:44organization's present insufficient
- 4:43:46status into a better future status. The
- 4:43:49second element is planning the change.
- 4:43:52The project manager identifies and plans
- 4:43:54any changed project operations and
- 4:43:57planning eases a stakeholders transition
- 4:44:00especially if they are involved in the
- 4:44:02delivery. In the implementing change
- 4:44:04element, the project manager must
- 4:44:06identify potential problems and fix
- 4:44:09them. This includes requesting feedback
- 4:44:12from the team and making required
- 4:44:14changes to keep the project on track.
- 4:44:17The next element, managing transitions,
- 4:44:19addresses issues during the project's
- 4:44:21transition from the present to future
- 4:44:24conditions. The project manager must fix
- 4:44:27unresolved issues to achieve the desired
- 4:44:30state. And the last element is
- 4:44:33sustaining change. Now the project
- 4:44:35manager must see that the change is
- 4:44:37sustained in the future state and if not
- 4:44:40sustained what needs to be fixed.
- 4:44:43Organizations can choose from several
- 4:44:45models to plan and implement change
- 4:44:48effectively. Commonly used models are
- 4:44:50the ADCAR model, the Cotter change model
- 4:44:53and the bridges transition model. The
- 4:44:56ADCAR model is outcome oriented. It
- 4:44:59outlines specific objectives that
- 4:45:01provide longlasting effects. The ADCAR
- 4:45:04model consists of five stages.
- 4:45:06Awareness, desire, knowledge, ability,
- 4:45:09and reinforcement.
- 4:45:12So the first step is creating awareness
- 4:45:14of the need for change. The project
- 4:45:16manager explains why the change is
- 4:45:19necessary, what it will entail, and its
- 4:45:21impact on the team. The second stage
- 4:45:24involves explaining the benefits and
- 4:45:26risks of the change. In the third stage,
- 4:45:29the team receives training and knowledge
- 4:45:32of how to change by discussing roles and
- 4:45:34responsibilities, innovative techniques,
- 4:45:37and procedures.
- 4:45:39In the fourth stage, anyone who needs
- 4:45:41help with the change will receive
- 4:45:43resources, tools, and support. In the
- 4:45:46last stage, the project manager
- 4:45:48reinforces change by adding incentives,
- 4:45:51kudos, criticism, and assessment to
- 4:45:54promote the winning situation and
- 4:45:56sustain the transition successfully.
- 4:45:58The next model, the Cotter change model
- 4:46:01introduced by John Carter, is an
- 4:46:03eight-step process for successfully
- 4:46:05implementing organizational change. In
- 4:46:08this top- down approach, the need
- 4:46:10originates at the organization's top,
- 4:46:13and this model has eight steps. Create a
- 4:46:16sense of urgency. Form a powerful
- 4:46:18coalition. Create a vision for the
- 4:46:20change. Communicate the vision. Remove
- 4:46:23obstacles. Create short-term wins. Build
- 4:46:26on the change and anchor the changes in
- 4:46:29corporate culture. So, first establish a
- 4:46:33sense of urgency for the change among
- 4:46:35managers and employees. Ask for their
- 4:46:38input on what is driving the need for
- 4:46:40change. You must identify potential
- 4:46:42threats or opportunities driving the
- 4:46:45need for change. Also, it is essential
- 4:46:48to share the value proposition.
- 4:46:50Next, create a powerful coalition by
- 4:46:53building a capable team with the
- 4:46:55necessary abilities, qualifications,
- 4:46:58reputation, connections, and authority
- 4:47:00to lead the change activities and
- 4:47:03influence stakeholders.
- 4:47:05In the third step, all stakeholders must
- 4:47:07share a clear and compelling vision for
- 4:47:10the change consistent with the
- 4:47:12organization's values and goals. In the
- 4:47:15fourth step, you communicate the vision
- 4:47:17and the strategies to inspire the rest
- 4:47:19of the company to accept and support
- 4:47:21changes. Note that there may be
- 4:47:23challenges in implementing this
- 4:47:25organizational transformation.
- 4:47:27Next, remove obstacles like inadequate
- 4:47:30processes, employee reluctance to
- 4:47:32change, supervisors who lack authority,
- 4:47:35corporate policies, and structure. In
- 4:47:38the sixth step, setting short-term
- 4:47:41targets that the team can achieve are
- 4:47:43set. This is critical to maintaining
- 4:47:45momentum and inspiring employees to
- 4:47:48support the initiative. recognize small
- 4:47:50victories to enhance confidence,
- 4:47:53maintain momentum, and spread excitement
- 4:47:55throughout the company. Next is to build
- 4:47:59on the change. While the team is
- 4:48:01celebrating their short-term wins from
- 4:48:03step six, more challenging goals should
- 4:48:05be pursued to continue improvement. And
- 4:48:08finally, the last step anchors the
- 4:48:10changes in corporate culture. The
- 4:48:13leaders must cultivate the new culture
- 4:48:15to sustain change by sharing the vision
- 4:48:17and success stories with everyone. Now,
- 4:48:21the last model commonly used to plan and
- 4:48:24implement change effectively. The
- 4:48:25bridges transition model by William
- 4:48:28Bridges helps individuals understand and
- 4:48:31manage a transition's emotional and
- 4:48:33psychological aspects. The three stages
- 4:48:36an individual experiences during change
- 4:48:39are ending, losing, and letting go. the
- 4:48:42neutral zone and the new beginning. In
- 4:48:45the ending, losing and letting go stage,
- 4:48:48individuals acknowledge their losses and
- 4:48:51learn to cope by deciding what they will
- 4:48:53preserve or lose. And this experience
- 4:48:56could cause sadness, loss, or relief.
- 4:49:00The second stage is the neutral zone. In
- 4:49:02this transitional period, individuals
- 4:49:05have not yet adjusted to the new
- 4:49:07situation. And some individuals
- 4:49:10productivity may drop during this stage
- 4:49:12due to continued frustration or
- 4:49:14confusion while others will grow as they
- 4:49:17open to new possibilities.
- 4:49:20The third and final stage is the new
- 4:49:22beginning stage. Individuals have
- 4:49:25adjusted to change and are moving
- 4:49:27forward. They may feel a sense of
- 4:49:29accomplishment and optimism in taking on
- 4:49:32new challenges and opportunities. In
- 4:49:35this video, you learned that change can
- 4:49:37affect systems, behaviors, activities,
- 4:49:39business requirements, and culture. The
- 4:49:42PMI's five interrelated elements of
- 4:49:45change include formulating change,
- 4:49:47planning change, implementing change,
- 4:49:50managing the transition, and sustaining
- 4:49:52change. And three commonly used models
- 4:49:56to implement change include the ADCAR
- 4:49:59model, the Cotter change model, and the
- 4:50:01bridges transition model.
- 4:50:06[Music]
- 4:50:14Welcome to managing quality. After
- 4:50:16watching this video, you will be able to
- 4:50:19define the PMI project management
- 4:50:21quality process, differentiate between
- 4:50:24quality assurance or QA and quality
- 4:50:27control or QC, and discuss tools and
- 4:50:31techniques used in quality management.
- 4:50:34Project quality management ensures that
- 4:50:36the deliverables are valuable and
- 4:50:38conform to requirements. It requires
- 4:50:41careful planning and execution to
- 4:50:43accomplish this. The project management
- 4:50:46body of knowledge seventh edition or
- 4:50:48pinbox 7 breaks out costs of quality
- 4:50:51into two categories. Costs of compliance
- 4:50:55and costs of non-compliance.
- 4:50:58Compliance costs abide by the laws,
- 4:51:00rules and regulations issued by
- 4:51:03regulatory bodies, governments or
- 4:51:05industry standards. And there are two
- 4:51:07categories of compliance costs.
- 4:51:10Prevention costs and appraisal costs.
- 4:51:13Prevention costs include expenses to
- 4:51:16prevent defects. And prevention costs
- 4:51:18also include product or service
- 4:51:20requirements, quality planning, quality
- 4:51:23assurance, and training. Appraisal costs
- 4:51:26evaluate the degree of compliance, and
- 4:51:28appraisal costs include these expenses:
- 4:51:31verification, quality audits, and
- 4:51:34supplier assessments and ratings.
- 4:51:37Non-compliance costs do not obey laws,
- 4:51:40rules, or industry standards. And these
- 4:51:43expenses can be internal or external
- 4:51:45failures. Internal failures include
- 4:51:48expenses to find and correct defects
- 4:51:51before delivering the final product.
- 4:51:54Internal failure costs are waste, scrap,
- 4:51:57and failure analysis. External failure
- 4:52:00expenses happen after the product is
- 4:52:03delivered and they are repairs and
- 4:52:05servicing, warranty claims, complaints,
- 4:52:08returns, and reputation.
- 4:52:10Now, project quality management is a
- 4:52:13straightforward three-step approach.
- 4:52:15Plan quality management, manage quality,
- 4:52:18and control quality. Planning quality
- 4:52:21management is a process that determines
- 4:52:23the project's requirements, standards,
- 4:52:25and procedures to attain the desired
- 4:52:27quality. It also develops a quality
- 4:52:30management plan. The quality assurance
- 4:52:33or QA stage puts the quality management
- 4:52:36plan into practice and ensures that the
- 4:52:38project conforms to standards, policies,
- 4:52:41and procedures. It employs quality
- 4:52:44audits to prevent issues from arising
- 4:52:47throughout the project. Quality control
- 4:52:49or QC monitors project outcomes to make
- 4:52:53sure they meet the quality standards. QC
- 4:52:56identifies problems in the product or
- 4:52:58service and addresses them before they
- 4:53:01affect final delivery. Quality control
- 4:53:04examines the products or services
- 4:53:06completeness, compliance, and
- 4:53:08suitability for use.
- 4:53:13So how do you differentiate between QA
- 4:53:16and QC? QA is a preventative process,
- 4:53:20but QC is a corrective process. QA is a
- 4:53:25proactive process before production or
- 4:53:27delivery. QC is a reactive process
- 4:53:31during or after production or delivery.
- 4:53:34And QA focuses on improvement and
- 4:53:37process optimization, while QC focuses
- 4:53:40on finding and fixing defects. Some
- 4:53:43tools and techniques commonly used in
- 4:53:46quality management to improve the
- 4:53:47quality of products or services include
- 4:53:50affinity diagrams, histograms, cause and
- 4:53:53effect diagrams, scatter diagrams,
- 4:53:56designing 4X, cypo diagrams, flowcharts,
- 4:54:00mind mapping, logical data models, and
- 4:54:03matrix diagrams. An affinity diagram
- 4:54:07organizes and classifies large amounts
- 4:54:09of data or ideas collected through
- 4:54:12brainstorming sessions. Then the ideas
- 4:54:14are grouped based on relationships and
- 4:54:17similarities. A histogram is a bar chart
- 4:54:21depicting a variable's distribution over
- 4:54:23time. It represents the distribution by
- 4:54:26mean. Histograms are commonly used in
- 4:54:29quality management to evaluate and
- 4:54:32improve processes, identify areas of
- 4:54:34variation and track performance over
- 4:54:37time. Cause and effect diagrams show the
- 4:54:41relationship between the results and
- 4:54:43root causes of problems. The Ishiawa
- 4:54:46diagram, named after its creator,
- 4:54:48Japanese quality control expert Karu
- 4:54:51Ishiawa, is also known as the fishbone
- 4:54:54diagram since its structure resembles a
- 4:54:57fish with the problem or effect being
- 4:54:59the head of the fish and the potential
- 4:55:01causes represented as the bones. Scatter
- 4:55:05diagrams discover patterns and trends in
- 4:55:07data to show the strength and direction
- 4:55:09of a relationship between two variables.
- 4:55:12In this illustration of two
- 4:55:14statistically independent variables, the
- 4:55:17two variables are plotted along two axes
- 4:55:20and the pattern of the resulting points
- 4:55:22reveal the correlation.
- 4:55:24The design for X or design for
- 4:55:26excellence lays out guidelines for
- 4:55:29reaching a project's objectives. It
- 4:55:31reviews and improves the new product or
- 4:55:34process design before manufacturing.
- 4:55:37Cypo stands for suppliers, inputs,
- 4:55:40processes, outputs, and customers. A
- 4:55:43cypo diagram, a six sigma tool,
- 4:55:46identifies the critical elements of a
- 4:55:48process, defines its boundaries, and
- 4:55:51determines the stakeholders involved. A
- 4:55:53flowchart visually represents the
- 4:55:55sequence of steps and decisions needed.
- 4:55:58The diagram includes notes for each
- 4:56:00step, and steps are linked by connecting
- 4:56:03lines and directional arrows. The
- 4:56:05logical data model is used to identify
- 4:56:08the areas where quality issues arise. It
- 4:56:11identifies potential solutions. Mind
- 4:56:14maps record and arrange concepts and
- 4:56:17data systematically. They involve
- 4:56:19creating a diagram representing the main
- 4:56:22idea or topic in the center with related
- 4:56:25ideas branching out hierarchically.
- 4:56:27Finally, matrix diagrams visualize
- 4:56:30complex relationships. They help
- 4:56:33identify how different elements in a
- 4:56:35project interact and depend on one
- 4:56:38another. In a table format, rows and
- 4:56:41columns represent different categories
- 4:56:43or dimensions. The intersections of
- 4:56:46these rows and columns describe the
- 4:56:48relationship between the categories.
- 4:56:52In this video, you learned that project
- 4:56:54quality management ensures that
- 4:56:56deliverables are valuable and conform to
- 4:56:59quality requirements. The pinbox 7
- 4:57:02breaks down the costs of quality into
- 4:57:04two categories. Compliance costs, which
- 4:57:07abide by the laws, rules, and
- 4:57:09regulations issued by regulatory bodies,
- 4:57:12governments, or industry standards, and
- 4:57:15non-compliance costs, which do not obey
- 4:57:17laws, rules, or industry standards. The
- 4:57:20project quality management three-step
- 4:57:23approach includes planning, quality
- 4:57:25management, managing quality, and
- 4:57:27controlling quality. QA is a
- 4:57:30preventative proactive process which
- 4:57:33identifies and prevents potential
- 4:57:34defects in a project. Whereas QC is a
- 4:57:38corrective reactive process which
- 4:57:41identifies weaknesses in a project to
- 4:57:43take corrective action. And tools and
- 4:57:46techniques that managers use in quality
- 4:57:48management include affinity diagrams,
- 4:57:51histograms, cause and effect diagrams,
- 4:57:54scatter diagrams, designing 4X, cypo
- 4:57:58diagrams, flowcharts, mind mapping,
- 4:58:01logical data models, and matrix
- 4:58:04diagrams.
- 4:58:08[Music]
- 4:58:18Welcome to the project initiation phase.
- 4:58:21After watching this video, you will be
- 4:58:23able to define the key processes and
- 4:58:26tools that drive a project's initiation
- 4:58:29phase. Now the initiation phase is the
- 4:58:33first of five phases or process groups
- 4:58:35in the project management institute or
- 4:58:38PMI framework. During this phase, the
- 4:58:41project manager introduces the project
- 4:58:44to the team, defines it at a high level
- 4:58:47and identifies key stakeholders and
- 4:58:49their roles. Successful completion of
- 4:58:52the initiation phase paves the way for
- 4:58:55the next project phase. Projects begin
- 4:58:58the initiation phase one of three ways.
- 4:59:01When the team approves a business case,
- 4:59:03the project sponsor and manager create a
- 4:59:06benefits management plan which documents
- 4:59:09a problem or an opportunity or when a
- 4:59:12service level agreement or SLA or a
- 4:59:15contract dictates action. Now once the
- 4:59:18initiation process begins the manager
- 4:59:21develops a project charter and this
- 4:59:23document proves the project scope and
- 4:59:25objectives at a high level. The team
- 4:59:28uses the project charter to determine if
- 4:59:31the potential project is ready for the
- 4:59:33planning phase. So project sponsors must
- 4:59:37approve every project charter before the
- 4:59:40next phase can begin. Sometimes a
- 4:59:43sponsor requests that the project
- 4:59:44manager rework the charter, postpone the
- 4:59:47project, or cancel it altogether. If the
- 4:59:50sponsor approves the charter, the
- 4:59:52project manager is given authority,
- 4:59:55resources, and sponsor support to move
- 4:59:57the project to the planning phase. Once
- 5:00:01the sponsor approves the project
- 5:00:02charter, the project achieves
- 5:00:04pre-baseline status. And this means the
- 5:00:07project is ready to move to the planning
- 5:00:10phase. Next, the manager creates a
- 5:00:13project brief using the project charter
- 5:00:15and stakeholder register. A project
- 5:00:18brief provides an outline of the project
- 5:00:21charter. So, the project manager can
- 5:00:24identify stakeholders during the project
- 5:00:26charter development and after the
- 5:00:29sponsor approves the charter. The
- 5:00:31manager defines critical project
- 5:00:33stakeholder roles and responsibilities
- 5:00:35in the stakeholder register. Then
- 5:00:37finally the project planning phase
- 5:00:40begins after the manager develops the
- 5:00:42stakeholder register.
- 5:00:45In this video you learned that the
- 5:00:47project initiation phase is the first
- 5:00:49phase in the PMI framework. The
- 5:00:52initiation phase begins when the team
- 5:00:54approves the business case when the
- 5:00:56project sponsor and manager create a
- 5:00:59business management plan or when a
- 5:01:01service level agreement or SLA dictates
- 5:01:04action. The project manager creates a
- 5:01:07project charter which provides project
- 5:01:10scope and objectives and a stakeholder
- 5:01:12register which identifies stakeholder
- 5:01:14roles and responsibilities. The project
- 5:01:17sponsor then must approve the project
- 5:01:19charter for the project to achieve
- 5:01:21pre-baseline status. And finally, the
- 5:01:24manager creates a project brief with the
- 5:01:27project charter and stakeholder
- 5:01:29register. And then the project is ready
- 5:01:31to move to the planning phase.
- 5:01:36[Music]
- 5:01:44Welcome to key project management
- 5:01:46modeling tools part one. After watching
- 5:01:49this video, you will be able to describe
- 5:01:52project management tools, define the
- 5:01:54term business case, and explain how to
- 5:01:57create a business case. The numerous
- 5:02:00methods, techniques, and software
- 5:02:02applications that project managers
- 5:02:04employ to plan, execute effectively, and
- 5:02:07monitor projects are project management
- 5:02:09tools. And these tools give project
- 5:02:12managers a complete picture of the
- 5:02:14project to evaluate its progress or
- 5:02:16success. Some of the key project
- 5:02:19management tools used today include a
- 5:02:21business case, a project charter, and a
- 5:02:24project brief. A business case is a
- 5:02:27written document that justifies the need
- 5:02:29for a project by outlining how its
- 5:02:31advantages outweigh its drawbacks. A
- 5:02:34business case is created in the
- 5:02:36project's initiation phase and covers
- 5:02:39the project's goals, expenses, and
- 5:02:42benefits to convince stakeholders of a
- 5:02:44project's worth. A business case
- 5:02:46outlines a problem or opportunity and
- 5:02:49provides details of strategy alignment,
- 5:02:52risk exposure, practicality from an
- 5:02:54economic standpoint, return on
- 5:02:56investment, success metrics, and other
- 5:02:59factors. Senior management considers the
- 5:03:02business case after completion. If
- 5:03:04approved, the business case provides the
- 5:03:07information required to complete a
- 5:03:09project charter. There are three
- 5:03:11important elements of a business case.
- 5:03:14the business need, the project
- 5:03:15justification, and the business
- 5:03:17strategy. Every project has a goal, and
- 5:03:21usually projects solve a specific
- 5:03:23business problem or create a business
- 5:03:26opportunity. Answering certain questions
- 5:03:29determines the need for a project. What
- 5:03:32is your project proposal? What are the
- 5:03:34overall project goals and objectives?
- 5:03:37Why is the project important? What value
- 5:03:40does the project deliver? What is the
- 5:03:42problem that it solves or the
- 5:03:44opportunity that it creates? And
- 5:03:46finally, what are the business drivers?
- 5:03:49After determining the need, you must
- 5:03:52justify the project by answering another
- 5:03:54set of questions. Do the costs outweigh
- 5:03:57the benefits? Why must this project be
- 5:04:00accepted now? What are the assumptions
- 5:04:02and constraints? And what are the
- 5:04:05potential risks? After obtaining the
- 5:04:08project justification, you must design
- 5:04:10the project strategy to inform
- 5:04:12stakeholders. Answer these questions to
- 5:04:15design the project strategy. How will
- 5:04:17the project be accomplished? What is the
- 5:04:20implementation strategy and what are the
- 5:04:23planned milestones? If accepted, most of
- 5:04:26the data presented in a business case is
- 5:04:28elaborated upon in a project charter.
- 5:04:32The following scenario will help you to
- 5:04:34understand how to create a business
- 5:04:36case. The first part of creating a
- 5:04:38business case is to define the business
- 5:04:40need. To begin, you need to introduce
- 5:04:43the proposed project. In this scenario,
- 5:04:46it is developing a coffee shop
- 5:04:48application. Next, define the goal of
- 5:04:51the project, which in this scenario is
- 5:04:53to develop an app that allows customers
- 5:04:55to gain information, access menus, make
- 5:04:59online orders, and provide feedback.
- 5:05:02Then define the situation or the
- 5:05:04context. Due to the absence of a
- 5:05:06physical store in the area, most
- 5:05:08competitors use an application to serve
- 5:05:11customers. Now describe the value the
- 5:05:14project can offer. In this scenario, the
- 5:05:17app will accomplish the following.
- 5:05:19Increase the store's revenue, improve
- 5:05:21customer satisfaction, improve employee
- 5:05:24efficiency, and streamline the ordering
- 5:05:26process at the store. Then identify the
- 5:05:30major challenge. In this scenario, the
- 5:05:32challenge will be to stay competitive
- 5:05:34and meet customer expectations.
- 5:05:37Finally, define the key project success
- 5:05:40driver, which in this scenario is to
- 5:05:42remain competitive and succeed in the
- 5:05:45growing market of coffee services. The
- 5:05:48second part of creating a business case
- 5:05:50is to justify the project. You must
- 5:05:53describe how the project cost outweighs
- 5:05:55its benefits. The cost is the amount
- 5:05:58spent on application development,
- 5:06:00network upgrade, and utilizing the
- 5:06:02services of a marketing consultant. The
- 5:06:05project benefits will include increased
- 5:06:07revenue, increased customer
- 5:06:09satisfaction, increase in the number of
- 5:06:12customers, and improvements in the
- 5:06:14store's efficiency.
- 5:06:17The cause of urgency is the reduction in
- 5:06:19sales by 12%. The constraint is the
- 5:06:22limited budget of $7,000.
- 5:06:25The assumption is to develop an app
- 5:06:27users want to use significantly raising
- 5:06:30potential sales, traffic, and revenue.
- 5:06:33And the potential risks in this project
- 5:06:36include going over budget, design flaws,
- 5:06:39delays in the development, lack of
- 5:06:42acceptance by customers, and lack of
- 5:06:44financial security. Now the third and
- 5:06:48final part of creating a business case
- 5:06:50is to create the business strategy which
- 5:06:52will help execute the project
- 5:06:54successfully. You can design a business
- 5:06:56strategy as easily as making a simple
- 5:06:59list of what needs to be done and by
- 5:07:01when. Design the application by May.
- 5:07:04Develop the app by June or July. Test
- 5:07:07and launch the app by August and receive
- 5:07:10feedback and make improvements to app by
- 5:07:13September or October.
- 5:07:16In this video, you learned that common
- 5:07:18project management tools include a
- 5:07:20business case, a project charter, and a
- 5:07:23project brief. A business case is a
- 5:07:26written document that covers the
- 5:07:27project's goals, expenses, and benefits
- 5:07:30to convince stakeholders of the
- 5:07:32project's worth. And three elements to
- 5:07:35consider when building a business case
- 5:07:37are the business need, the project
- 5:07:39justification, and the business
- 5:07:42strategy.
- 5:07:45[Music]
- 5:07:52Welcome to key project management
- 5:07:54modeling tools part two. After watching
- 5:07:57this video, you will be able to explain
- 5:08:00the project charter with the help of an
- 5:08:02example and explain the project brief
- 5:08:05with the help of an example as defined
- 5:08:08by the project management institute or
- 5:08:10PMI. A project charter is a document
- 5:08:13issued by the project initiator or
- 5:08:15sponsor that formally authorizes the
- 5:08:17existence of a project and provides the
- 5:08:20project manager with the authority to
- 5:08:22apply organizational resources to
- 5:08:24project activities. A project charter is
- 5:08:27a document that outlines the key
- 5:08:29elements of a project and ensures a
- 5:08:32common understanding of the project's
- 5:08:33purpose, goals, and stakeholders. A
- 5:08:36project charter template usually
- 5:08:38includes project name, which should give
- 5:08:41the project an identifying name, and
- 5:08:43project goal, which should specify the
- 5:08:46project's goal and its proposed product
- 5:08:48or service. One can also include project
- 5:08:51value proposition and benefits, project
- 5:08:54or opportunity statement, project
- 5:08:57schedule, project manager, approval
- 5:08:59space, and authority or sponsor space.
- 5:09:02The following example will demonstrate
- 5:09:05how to design a project charter. First,
- 5:09:08you need to provide general information
- 5:09:10about the project titled ABC coffee shop
- 5:09:13application. Next, you will initiate the
- 5:09:16development of the application which
- 5:09:18aims to allow customers to gain
- 5:09:20information, access menus, make online
- 5:09:23orders, and provide feedback. And this
- 5:09:26project will provide the following
- 5:09:28benefits. increasing the store's
- 5:09:30revenue, improving customer
- 5:09:32satisfaction, improving employee
- 5:09:34efficiency, and streamlining the
- 5:09:36ordering process. The major challenge
- 5:09:39faced is that the majority of your
- 5:09:41competitors have functional applications
- 5:09:43already. Since the competitors were
- 5:09:45available online, you have noticed a 12%
- 5:09:48decline in sales. To stay competitive,
- 5:09:51you must use this application. So, you
- 5:09:54begin the project in May and finish it
- 5:09:57in October. and Bethany Harris is
- 5:09:59appointed as the project manager and
- 5:10:01will be approved by Evan Marsh. The
- 5:10:04following assumptions are made while
- 5:10:06creating the project charter. Sales,
- 5:10:09customer traffic and customer
- 5:10:10satisfaction will increase. The
- 5:10:13application will be accessible and used.
- 5:10:16The number of online orders and store
- 5:10:18efficiency will increase. The
- 5:10:20application can be developed in the
- 5:10:22defined period. The application will
- 5:10:25have the quality required for the
- 5:10:27available budget and the functionality
- 5:10:29will match that of the competitor apps.
- 5:10:32Then the following constraints apply. An
- 5:10:35amount of $7,000 has been set as the
- 5:10:38budget. Only authorized vendors may be
- 5:10:40used for contracts and only fixed price
- 5:10:43contracts are authorized.
- 5:10:45There are five proposed solutions. Get
- 5:10:48the applications design ready by May and
- 5:10:51ensure the required functionality is
- 5:10:53identified and incorporated. Send out
- 5:10:56proposals and finalize vendor
- 5:10:58development contracts. Complete the
- 5:11:00application development by June or July.
- 5:11:03Build and evaluate the initial prototype
- 5:11:06and identify the features to be
- 5:11:08incorporated into the app while staying
- 5:11:10on budget. Complete the application test
- 5:11:14by August. To test the application,
- 5:11:16perform a beta test with coffee shop
- 5:11:18employees only, and test the
- 5:11:20functionality, identify defects, and
- 5:11:23resolve issues. You will then be able to
- 5:11:26launch the application in August. Make
- 5:11:28the application available at no charge
- 5:11:31to all customers. Market and advertise
- 5:11:34the application's availability, and
- 5:11:36lastly, gather feedback for 2 months,
- 5:11:39and design version two with improved
- 5:11:41features. Next, you define the project
- 5:11:44priorities. The application should be
- 5:11:47launched in August. The budget should
- 5:11:49not exceed $7,000.
- 5:11:52Moderate functionality is needed in
- 5:11:54version one and functionality may be
- 5:11:57modified. So, now that the priorities
- 5:12:00are defined, you turn your attention to
- 5:12:02the return on investment. You can
- 5:12:04predict that the sales will increase by
- 5:12:0718%. Due to the achieved efficiency,
- 5:12:10expect a reduction in the amount of work
- 5:12:12required. And as compared to the cost of
- 5:12:15$7,000, sales are expected to grow by
- 5:12:18$60,000 in one year. Now, you will also
- 5:12:23need to be aware of the potential risk
- 5:12:25associated with the project. If the
- 5:12:27budget increases, return on investment
- 5:12:30will decrease. Design flaws may cause
- 5:12:33implementation delays and functionality
- 5:12:35limitations. Development delays will
- 5:12:38delay the planned schedules. Customer
- 5:12:41dissatisfaction may reduce projected
- 5:12:43sales growth and financial security may
- 5:12:47help address customer trust issues. At
- 5:12:50last, the project charter will cover the
- 5:12:52resources required in the project and
- 5:12:55you will need the following resources to
- 5:12:57complete the project. A project manager
- 5:13:00and team, marketing, IT, external
- 5:13:03developers, and contractors.
- 5:13:06A project brief provides stakeholders
- 5:13:08with a concise summary and overview of
- 5:13:11the project as they don't need all the
- 5:13:13details. It lays the foundation for
- 5:13:16building a detailed project plan and
- 5:13:18helps ensure everyone involved in the
- 5:13:20project works toward a common goal. The
- 5:13:23information that a business case and a
- 5:13:25project charter contain is required to
- 5:13:28complete a project brief. The seven
- 5:13:30pieces of information that a project
- 5:13:32brief contains include the project name,
- 5:13:35manager, purpose, benefits, schedule,
- 5:13:38costs, and sponsorship. The following
- 5:13:41example will assist you in learning
- 5:13:43about the project brief. In this
- 5:13:45example, the goal of the project is to
- 5:13:47develop an application that allows
- 5:13:49customers to gain information, access
- 5:13:52menus, make online orders, and provide
- 5:13:55feedback. Competitors currently have
- 5:13:58functional applications in place and you
- 5:14:01need to beat the competition and
- 5:14:02maintain a competitive advantage. And
- 5:14:05next, the project will provide the
- 5:14:07following benefits: increased revenue,
- 5:14:10improvement in customer satisfaction,
- 5:14:13improvement in employee efficiency, and
- 5:14:16streamlined ordering process. The
- 5:14:18project is scheduled to begin in May and
- 5:14:21finish by October. The project costs are
- 5:14:24estimated to be $7,000 and sales will
- 5:14:27increase by 18% in one year. And
- 5:14:31finally, the project will be sponsored
- 5:14:33by Evan Marsh.
- 5:14:35In this video, you learned that a
- 5:14:37project charter is issued by the project
- 5:14:40initiator or sponsor that formally
- 5:14:42authorizes the existence of a project. A
- 5:14:45project charter is a document that
- 5:14:47ensures a common understanding of the
- 5:14:49project's purpose, goals, and
- 5:14:51stakeholders. The project charter
- 5:14:53template should include the project's
- 5:14:55name, goal, value, problem statement,
- 5:14:58schedule, manager, and approval contact.
- 5:15:01The project brief provides a concise
- 5:15:04summary of a project charter. And the
- 5:15:06project brief should include the
- 5:15:08project's name, manager, purpose,
- 5:15:10benefit, schedule, costs, and sponsor.
- 5:15:16[Music]
- 5:15:24Welcome to expert viewpoints project
- 5:15:26initiation. In this video, we will hear
- 5:15:30from project managers on how to
- 5:15:31effectively initiate and kick off a
- 5:15:33project.
- 5:15:34>> I think there's a few things that a
- 5:15:36project manager can do to successfully
- 5:15:38initiate and kick off a project. Um the
- 5:15:42the first step for me in in setting up a
- 5:15:45project and getting ready to roll it out
- 5:15:47to a broader team is to make sure that
- 5:15:50the project manager really understands
- 5:15:52what it is that the project is meant to
- 5:15:54accomplish. So um the second stage that
- 5:15:58I I always do is um is make sure that
- 5:16:01people understand the ultimate goal, the
- 5:16:02outcome. I'm talking about um really
- 5:16:05articulating the vision. So this is what
- 5:16:07the reason why we're developing this
- 5:16:10software. This is what the software is
- 5:16:12going to accomplish. This is the
- 5:16:13difference it's going to make in the
- 5:16:14users or the client's life once we get
- 5:16:17this software outial.
- 5:16:19Um the third stage for me is ensuring
- 5:16:22that the team really has a good sense of
- 5:16:25how the project is going to be managed
- 5:16:27and also allowing for enough input so
- 5:16:31that as as things aren't working the
- 5:16:34team feels like they can adjust and
- 5:16:37really ensure that my team understands
- 5:16:40that they have a voice. Um because the
- 5:16:42people that are actually doing the work
- 5:16:44have the best insights into a
- 5:16:46methodology, a program project
- 5:16:48management methodology that's going to
- 5:16:49make that project successful.
- 5:16:53Preparation is key to a solid project
- 5:16:55kickoff and I find that many project
- 5:16:57managers don't prepare enough. PM should
- 5:17:00gather and organize materials ahead of
- 5:17:03the meeting with their team for an
- 5:17:04internal kickoff. And if there are
- 5:17:06documents that are going to be
- 5:17:07referenced, like have your links ready
- 5:17:10to add to the chat for quick reference.
- 5:17:12And also include those same links in the
- 5:17:14meeting notes that you send out after
- 5:17:16the kickoff. No one should ever be
- 5:17:18guessing on where to go to find things.
- 5:17:20We want to make it really, really easy
- 5:17:22for them. Also, take the time to discuss
- 5:17:25potential client questions um that might
- 5:17:28occur during the external kickoff and
- 5:17:30have a plan for how to address them.
- 5:17:33I always recommend sending out a
- 5:17:35detailed agenda before your external
- 5:17:37kickoff so clients know what to expect.
- 5:17:40All this just sets the tone that your
- 5:17:42team is aligned, organized, and
- 5:17:45confident. You want to make a great
- 5:17:47first impression at the start of a
- 5:17:49project.
- 5:17:51And lastly, end your meeting on time.
- 5:17:54That shows that you respect people's
- 5:17:55time and busy schedule.
- 5:17:58The first piece of advice that I want to
- 5:18:00give you as a project manager when you
- 5:18:02are assigned a new project, learn as
- 5:18:05much as you can about the project as
- 5:18:07quickly as you can. But let's go ahead
- 5:18:10and break this out into three steps.
- 5:18:12Step number one, review the documents
- 5:18:14that initiated the project. These may
- 5:18:17include a statement of work, business
- 5:18:19case, contract. In some cases, it may be
- 5:18:22an email from your boss. Understand the
- 5:18:25what and the why behind the project.
- 5:18:28Step number two, develop a project
- 5:18:30charter and share this project charter
- 5:18:32with a sponsor. Ensure the charter meets
- 5:18:36the needs of the project and the
- 5:18:38sponsor. Finalize approval. Until a
- 5:18:42sponsor approves the project charter,
- 5:18:44you're not ready to move forward. The
- 5:18:46final step, determine stakeholder
- 5:18:48support requirements and develop a
- 5:18:50stakeholder register. Ensure all
- 5:18:53stakeholders have well-defined roles and
- 5:18:55responsibilities. Ensure that they are
- 5:18:58identified early and most importantly
- 5:19:01have a discussion to determine if
- 5:19:04they're able to commit to these roles.
- 5:19:07>> My expectations for a sufficient project
- 5:19:09brief is one that I can read and know
- 5:19:12from reading it that my project manager
- 5:19:15understands what it is that they're
- 5:19:17going to be doing. They know the goals
- 5:19:18of the project. They know the timeline
- 5:19:20that the client wants the project
- 5:19:22executed on and they have a fairly clear
- 5:19:25understanding of the resources that need
- 5:19:27to be involved in the project.
- 5:19:30It really depends on the type of project
- 5:19:33to find out what exactly you need in
- 5:19:35your brief. I'll give an example of when
- 5:19:37I worked at a cloud security company and
- 5:19:39we did implementations. A lot of times I
- 5:19:41would learn a lot of information from
- 5:19:43our sales team and anybody else that
- 5:19:46worked on a project with the customer
- 5:19:48previously. First off, I want to know
- 5:19:50what is the scope to find out what is in
- 5:19:54scope, what is considered as out of
- 5:19:55scope. Expectations. Is there any
- 5:19:58unknowns that I need to know in there?
- 5:20:01Any potential risk or issues? Do we have
- 5:20:04any potential sales or anything like
- 5:20:06that for them along with who is the key
- 5:20:09stakeholders?
- 5:20:12Now
- 5:20:14before the presentation is even made the
- 5:20:16one of the most important things you can
- 5:20:18have is that support of your champion or
- 5:20:20your sponsor
- 5:20:22they have to see that executive
- 5:20:24management supports the project.
- 5:20:27That's half the battle. Another thing is
- 5:20:29that it authorizes the project. The
- 5:20:32project should never even start without
- 5:20:34this charter being agreed upon with your
- 5:20:37stakeholders. Why? Because the one thing
- 5:20:40that can derail a project is coming back
- 5:20:44later and people seeing that not
- 5:20:46everybody agreed or someone standing up
- 5:20:48and saying, "I I'm a major stakeholder,
- 5:20:51but I never even agreed to this. I never
- 5:20:53got a chance to review this. I didn't
- 5:20:55know that that was going on." So, you
- 5:20:58have to have all of your stakeholders
- 5:21:01buying off on the charter.
- 5:21:04One is to understand the stakeholders
- 5:21:07that are going to be involved and then
- 5:21:09also the REI. Highly suggest having your
- 5:21:12REI involved on your charter if
- 5:21:15available overall scope included what's
- 5:21:18included what's not included the overall
- 5:21:22expectations and for it to be very
- 5:21:25straightforward not convoluted.
- 5:21:29Very very important number one tip. Keep
- 5:21:32the presentation brief. In addition,
- 5:21:35ensure you understand the expectations
- 5:21:37of the audience. However, regardless, at
- 5:21:41minimum, every presentation should
- 5:21:44include number one, a brief overview of
- 5:21:47the project purpose. Again, why is this
- 5:21:50pro project important? What w what
- 5:21:53purpose will it serve? Secondly, an
- 5:21:56overview of the project value and why
- 5:21:58the project should be accomplished now.
- 5:22:01Just because a project has value doesn't
- 5:22:03necessarily mean that the time to
- 5:22:04implement it is today. Third, a brief
- 5:22:08description of scope, schedule, and
- 5:22:10budget considerations. Remember, less is
- 5:22:13more. Keep it short. And if possible,
- 5:22:17pictures such as graphs and other
- 5:22:19visuals are very impactful. You've heard
- 5:22:22the term a picture is worth a thousand
- 5:22:23words. It certainly is impactful in a
- 5:22:27successful project charter presentation.
- 5:22:30Finally, do not end the presentation
- 5:22:33without a decision. Decisions may
- 5:22:35include approved for planning, approved
- 5:22:38with modifications, deferred until
- 5:22:40another time, or potentially a promise
- 5:22:43to update and revisit the project
- 5:22:45charter with a defined date.
- 5:22:50[Music]
- 5:22:59Welcome to the stakeholder register.
- 5:23:02After watching this video, you will be
- 5:23:04able to explain a stakeholder register
- 5:23:07and describe what a stakeholder register
- 5:23:10includes. In order to understand what a
- 5:23:13stakeholder register is, one needs to
- 5:23:15know what stakeholders are. One of the
- 5:23:18key goals of the project initiation
- 5:23:20phase is to identify those who need to
- 5:23:23be part of the project. It means
- 5:23:26identifying the core team, sponsors,
- 5:23:29department directors, subject matter
- 5:23:31experts or SMEES, customers, operations
- 5:23:34and other key roles and these people are
- 5:23:37called stakeholders. They are an
- 5:23:40important part of a project as they
- 5:23:42provide the support necessary for the
- 5:23:44project to succeed. their decisions play
- 5:23:47a vital role in the project's success.
- 5:23:51Now, there are several advantages to
- 5:23:53identifying stakeholders early in a
- 5:23:55project. Stakeholders must be aware of
- 5:23:58the project to be able to assist in or
- 5:24:01contribute to project management later.
- 5:24:04They should be given prior notice so
- 5:24:06that they can plan their participation.
- 5:24:09Before committing to support,
- 5:24:11stakeholders must be aware of their
- 5:24:13roles and obligations which must be
- 5:24:15understood, successfully conveyed and
- 5:24:18assigned. And in some cases,
- 5:24:21stakeholders might be unable to provide
- 5:24:24the required support for a project. A
- 5:24:26project manager in this case must
- 5:24:29identify potential gaps in support and
- 5:24:31act quickly to resolve problems. There
- 5:24:34can also be a need for further training
- 5:24:37due to inadequate skill levels or
- 5:24:39workforce crisis. A project manager
- 5:24:42needs to address these problems. And
- 5:24:45lastly, effective communication is
- 5:24:48essential to manage a project
- 5:24:49successfully. Lists of stakeholders who
- 5:24:52need to communicate are available in a
- 5:24:55stakeholder register. A stakeholder
- 5:24:58register is a document that lists all
- 5:25:00the stakeholders associated with a
- 5:25:03project along with relevant information
- 5:25:05about each of them. This information may
- 5:25:08be used to monitor and manage
- 5:25:10stakeholder expectations throughout the
- 5:25:13project life cycle. A stakeholder
- 5:25:15register includes certain columns. Some
- 5:25:18of these include name or position which
- 5:25:21implies the name or position of each
- 5:25:23stakeholder. organization which implies
- 5:25:26the department or organization that the
- 5:25:29stakeholder is associated with and is a
- 5:25:32column that can be deleted or left blank
- 5:25:34if it doesn't apply. the role which
- 5:25:37implies an accurate brief and clear
- 5:25:40explanation of a stakeholder's role and
- 5:25:43REI or RACI which is a responsibility
- 5:25:47defining matrix and stands for
- 5:25:49responsible accountable consulted and
- 5:25:52informed for successful project
- 5:25:55management. It is important that
- 5:25:57everyone involved in a project
- 5:25:59understands their role and
- 5:26:00responsibilities
- 5:26:02and this can be achieved through a racy
- 5:26:05chart. It defines the roles and
- 5:26:07responsibilities of all stakeholders in
- 5:26:10a project. Now the four roles that REI
- 5:26:13defines include the following.
- 5:26:16Responsible, which means the person is
- 5:26:18in charge of performing the work or
- 5:26:20producing the desired outcome.
- 5:26:23Accountable, which means the person is
- 5:26:25responsible for the task or result and
- 5:26:28makes the final decision about its
- 5:26:30accomplishment. Consulted, which means
- 5:26:33the person is consulted but not
- 5:26:35authorized to make decisions. And
- 5:26:38informed, which means the person is kept
- 5:26:41informed of progress and results, but is
- 5:26:43neither consulted nor responsible for
- 5:26:46the task or result. There are a few more
- 5:26:49important points to consider regarding
- 5:26:52the stakeholder register. A single
- 5:26:54stakeholder may have one or multiple
- 5:26:57racy designators. It's not necessary to
- 5:27:00name every stakeholder. For instance,
- 5:27:03seven marketing personnel will be
- 5:27:05working on a project and you need help
- 5:27:07with marketing. Choose a single liaison
- 5:27:10that can assist the marketing team as a
- 5:27:12whole. And if more than one entry is
- 5:27:15needed, try to functionally group as
- 5:27:17many members of the marketing team as
- 5:27:19possible. It is not important to list
- 5:27:22every member of a project team. However,
- 5:27:24the addition of core team members
- 5:27:27actively engaged in project planning is
- 5:27:29necessary. A stakeholder register is an
- 5:27:32evolving document and expands as the
- 5:27:35project progresses. Maintaining a
- 5:27:38stakeholder register up to date and
- 5:27:40using version control is important. It
- 5:27:43might be helpful to look at an example
- 5:27:45of the stakeholder register format. In
- 5:27:48this register are the names of the
- 5:27:50different stakeholders, their
- 5:27:52organizations and their roles in the
- 5:27:54project. And you can also view the task
- 5:27:57they are required to perform.
- 5:28:00In this video, you learned that a
- 5:28:02stakeholder is anyone who needs to be
- 5:28:05part of a project. A stakeholder
- 5:28:07register is a document that lists
- 5:28:09stakeholders associated with a project.
- 5:28:12This register includes the stakeholders
- 5:28:14name, organization, role, and REI. A
- 5:28:18stakeholder may have one or multiple REI
- 5:28:21designators. Not every stakeholder needs
- 5:28:23to be named. Not every member of a
- 5:28:26project team needs to be listed.
- 5:28:29Finally, the stakeholder register is
- 5:28:31ever evolving.
- 5:28:35[Music]
- 5:28:43Welcome to decisionmaking. After
- 5:28:46watching this video, you will be able to
- 5:28:48describe the importance of effective
- 5:28:50decision-m and identify various methods
- 5:28:53used to make effective decisions.
- 5:28:56Effective decision-m means making
- 5:28:58informed, timely, and well-considered
- 5:29:01decisions that support the successful
- 5:29:03completion of a project. Effective
- 5:29:06decision-making in project management
- 5:29:08can lead to better project outcomes,
- 5:29:10improved teamwork and stakeholder
- 5:29:12relations, and more informed and
- 5:29:15effective resource allocation.
- 5:29:17According to the Project Management
- 5:29:19Institute or PMI, a project manager
- 5:29:22should seek expert judgment when making
- 5:29:24an important decision instead of making
- 5:29:27a unilateral decision. Involving experts
- 5:29:30in the decision-making process improves
- 5:29:33the chances of project success and
- 5:29:35increases stakeholder confidence in the
- 5:29:37process and outcome. A project manager
- 5:29:41should handle group discussions
- 5:29:42carefully as they have both pros and
- 5:29:45cons. In group discussions, team members
- 5:29:48are more likely to feel involved in
- 5:29:50decisions they have helped design which
- 5:29:52can enhance their buyin and commitment.
- 5:29:55However, it can be a time-consuming
- 5:29:57process which may result in lengthy
- 5:30:00discussions and debates. As per the PMI,
- 5:30:04a project manager should pursue team
- 5:30:06decision-m more often. Each team member
- 5:30:09can share their ideas and the group
- 5:30:11works collaboratively to arrive at a
- 5:30:14decision. A project manager should
- 5:30:16encourage participation from all
- 5:30:18stakeholders and acknowledge their
- 5:30:21contribution. However, the project
- 5:30:23manager is ultimately accountable and
- 5:30:26should try to make project decisions as
- 5:30:29early as possible. A project manager and
- 5:30:32team members must understand each
- 5:30:35decision's importance and nature and
- 5:30:37adopt an optimal approach to ensure a
- 5:30:39successful outcome. Now the PMI has
- 5:30:43documented a few important methods for
- 5:30:45making effective decisions and these
- 5:30:48include voting fisttoive nominal group
- 5:30:51technique or NGT autocratic multiriteria
- 5:30:55decision analysis or MCDA
- 5:30:58and wideband deli. Voting is a popular
- 5:31:02method for collective decision-making
- 5:31:04and it can help make decisions
- 5:31:06effectively in certain situations by
- 5:31:08allowing democratic participation and
- 5:31:11representation. However, it can also
- 5:31:14lead to conformity as sometimes
- 5:31:16participants feel pressured to choose
- 5:31:18what the rest of the group wants them to
- 5:31:20do. Now, there are three ways to
- 5:31:23determine a voting result. Unimity
- 5:31:26involves 100 support for the decision
- 5:31:28path from the voting members. the
- 5:31:30majority which involves more than 50%
- 5:31:33support for the decision path from the
- 5:31:35voting members and plurality indicates
- 5:31:38the largest group determining the
- 5:31:40decision path and note it is possible to
- 5:31:43have a plurality of opinions resulting
- 5:31:46in a decision made by less than 50% of
- 5:31:49the group. Fista 5 is a quick way to
- 5:31:52collect user input in a group or to
- 5:31:54determine general agreement. The leader
- 5:31:57restates a course of action and requests
- 5:32:00that the others express their level of
- 5:32:02support by putting up several fingers
- 5:32:04ranging from zero to five. Five
- 5:32:07represents a complete agreement. Whereas
- 5:32:09clenching your fist indicates strong
- 5:32:12disagreement and after indicating their
- 5:32:15support levels, the group can quickly
- 5:32:17see where most of the support lies and
- 5:32:19decide based on that. The nominal group
- 5:32:22technique or NGT is a systematic
- 5:32:25approach to group brainstorming that
- 5:32:27promotes contributions from all
- 5:32:29participants and allow speedy agreement
- 5:32:31on the relative importance of topics,
- 5:32:34problems, or solutions. Team members
- 5:32:37begin by writing down their ideas and
- 5:32:39selecting which is best. After team
- 5:32:41members are ready, everyone presents
- 5:32:44their favorite idea and the group
- 5:32:46discusses and prioritizes the
- 5:32:48suggestions using a point system.
- 5:32:51An autocratic leadership style is one in
- 5:32:53which a single individual, usually a
- 5:32:56manager or leader, makes all the
- 5:32:58decisions without seeking input from
- 5:33:00others. Autocratic decisionm is most
- 5:33:03effective when the leader clearly
- 5:33:05understands the situation and needs to
- 5:33:08decide and act quickly. Multiriteria
- 5:33:11decision analysis or MCDA is a weighted
- 5:33:15decision-making method that involves
- 5:33:17choosing between options when multiple
- 5:33:19criteria or objectives are available for
- 5:33:22consideration. It helps ensure that
- 5:33:25decisions involve systematic and
- 5:33:27objective evaluation of the available
- 5:33:30options. This example compares two
- 5:33:33providers on several variables including
- 5:33:35pricing, capacity, delivery, competence,
- 5:33:38and reputation.
- 5:33:40The last method recommended by the PMI
- 5:33:43is wideband deli. This method is
- 5:33:46employed when a decision needs to remain
- 5:33:49confidential. The project manager
- 5:33:51facilitates this method. The method is
- 5:33:54used when participants hesitate to voice
- 5:33:56their ideas publicly or for the widely
- 5:33:59dispersed team. Here is an overview of
- 5:34:02the process. Step one, the facilitator
- 5:34:05presents the problem to the concerned
- 5:34:07team in a group or individually. Step
- 5:34:10two, participants present their ideas or
- 5:34:13solutions through their choice of
- 5:34:14communication like posts, emails, or
- 5:34:17text messages. Step three, the
- 5:34:20facilitator collects the feedback and
- 5:34:22tabulates the results. And step four,
- 5:34:25the results are declared, but the
- 5:34:28identification of the participants and
- 5:34:30votes are kept confidential.
- 5:34:32Another helpful method to make effective
- 5:34:34decisions is the owner approver
- 5:34:37reviewers and participants or OARP
- 5:34:40method. Although not documented by PMI,
- 5:34:44this is a useful technique for making
- 5:34:46effective decisions. It is a structured
- 5:34:49process of making decisions that involve
- 5:34:51uncertainty. Note that the actual
- 5:34:53process steps arrange the acronym to be
- 5:34:56OP A. There are four steps in the O ARP
- 5:35:01method. Step one, the owner of the
- 5:35:04decision, often the project manager,
- 5:35:06identifies the issue, the opportunity,
- 5:35:08and the action required. Step two, the
- 5:35:12participants and the owner discuss the
- 5:35:14decision-making process. Participants
- 5:35:17are often the decision-making
- 5:35:19stakeholders who will be most affected
- 5:35:21and may include operators, end users,
- 5:35:24consumers, technical support staff, and
- 5:35:27other individuals.
- 5:35:29Step three, the reviewers, a group of
- 5:35:32stakeholders who are often managers of
- 5:35:34the participants, work with owners to
- 5:35:36review decision criteria and participant
- 5:35:39input. Reviewers develop opinions they
- 5:35:42believe are not feasible for moving
- 5:35:44forward. And step four, the approver is
- 5:35:48usually the sponsor in a project
- 5:35:50environment and reviews proposed options
- 5:35:52and makes a final decision. And this
- 5:35:55decision is relayed to the owner for
- 5:35:57communication and execution.
- 5:36:01In this video, you learned that
- 5:36:03effective decision-making means making
- 5:36:05informed, timely, and well-considered
- 5:36:08decisions that can lead to better
- 5:36:10project outcomes, improved teamwork and
- 5:36:13stakeholder relations, and informed
- 5:36:15resource allocation. And methods used to
- 5:36:18make effective decisions include voting
- 5:36:21fistto five nominal group technique or
- 5:36:24NGT autocratic multiriteria decision
- 5:36:28analysis or MCDA and wideband deli.
- 5:36:35[Music]
- 5:36:41Welcome to expert viewpoints stakeholder
- 5:36:44identification and management. In this
- 5:36:47video, we will hear from project
- 5:36:49managers on how to effectively identify
- 5:36:51stakeholders and their roles and
- 5:36:53responsibilities.
- 5:36:55>> As you're starting a new project, one,
- 5:36:58reflect on previous projects that may be
- 5:37:00similar. Talk to your manager. Talk to
- 5:37:02other people who may have done to uh may
- 5:37:05have done a similar project and talk to
- 5:37:07your mentor about it. Put on your
- 5:37:10recruiter hat. Identify the roles that
- 5:37:12you need stakeholders in and what their
- 5:37:14responsibilities will be. and then write
- 5:37:16it down. Write up a job description that
- 5:37:18that clearly states here's your role and
- 5:37:22here's your responsibility. That's also
- 5:37:24going to contribute towards your racy
- 5:37:26and clarity within your project team
- 5:37:28about who is doing what. If you need to
- 5:37:31train your stakeholders, also add a
- 5:37:33column for that or a paragraph for that.
- 5:37:36First, I would start out meeting with
- 5:37:39the project manager if there is a
- 5:37:41customer project manager. So it depends
- 5:37:43on the type of project that you're
- 5:37:45working on. That way you can understand
- 5:37:47who is a stakeholder on their side. You
- 5:37:49can meet forward with who we have on our
- 5:37:51side and create a receipt plan with that
- 5:37:53and a stakeholder communications plan.
- 5:37:56Otherwise, it will have to be an
- 5:37:58internal type of project and you would
- 5:38:01meet with your leadership and anyone
- 5:38:03else that is a key stakeholder to help
- 5:38:05you understand who is going to be part
- 5:38:07of the project and then understand what
- 5:38:10are they really great as far as being
- 5:38:13that can help you out towards your
- 5:38:14project and create your race.
- 5:38:17>> Well, the simple answer of course is
- 5:38:19yes. As soon as you are assigned as a
- 5:38:22project manager, do a inventory of
- 5:38:26stakeholders. These are by definition
- 5:38:28individuals interested or impacted by
- 5:38:31the project. Generally, when I identify
- 5:38:34stakeholders, I break out stakeholders
- 5:38:36into four different groups and
- 5:38:38systematically try to identify those in
- 5:38:40each group who are pertinent to the
- 5:38:43project. So, let's go ahead and take a
- 5:38:45look at group one. I start at the very
- 5:38:47beginning. Who are the stakeholders who
- 5:38:49are interested in driving this project?
- 5:38:51These are generally your sponsors and
- 5:38:53your executive leaders. You definitely
- 5:38:56need to communicate the project with
- 5:38:58this particular group. Next, ask
- 5:39:00yourself whose support is needed to make
- 5:39:03this project a success. These
- 5:39:06individuals in group number two are your
- 5:39:08core team members who are going to be
- 5:39:10required to help you plan the project.
- 5:39:12The third group is to determine who
- 5:39:14controls and manages the resources that
- 5:39:17you will need. Resources include
- 5:39:19personnel, materials, supplies, and
- 5:39:22equipment. And finally, last but not
- 5:39:24least, brainstorm who is ultimately the
- 5:39:27project going to be transitioned to.
- 5:39:30This may include customers, end users,
- 5:39:32and operations.
- 5:39:34>> The first step to ensuring that a
- 5:39:36stakeholder understands their role is
- 5:39:38writing it down and detailing their
- 5:39:40responsibilities.
- 5:39:42The second step is having a direct
- 5:39:44face-to-face conversation about those
- 5:39:47responsibilities.
- 5:39:49Is this list realistic? Do you
- 5:39:51anticipate any blockers in your
- 5:39:52schedule? How are you feeling about
- 5:39:54this? Once you've had that conversation
- 5:39:57and you have that document detailing all
- 5:39:59of their tasks, make sure to socialize
- 5:40:02it with the project owners on the client
- 5:40:04side. This adds a bit of social pressure
- 5:40:07and accountability.
- 5:40:10first in order to asssure that
- 5:40:11stakeholders and people that are
- 5:40:13involved on the project understand the
- 5:40:16project the scope itself and they have
- 5:40:19the buyin. Once they truly understand
- 5:40:22what it is, how they can help the
- 5:40:23project, then from there you explain how
- 5:40:27you can also help them become a servant
- 5:40:29leader and help them out as far as
- 5:40:31throughout their project. That way you
- 5:40:33can get a lot more buy in as well.
- 5:40:36Well, rule number one, do not assume. Do
- 5:40:39not make an assignment and assume the
- 5:40:42stakeholder truly understands their role
- 5:40:44and responsibilities and is
- 5:40:47automatically willing to go ahead and
- 5:40:49commit. After a stakeholder role and
- 5:40:52responsibility is identified, have the
- 5:40:55conversation. What do we mean by that?
- 5:40:58Ensure the stakeholder number one
- 5:41:00understands the role and two feels ready
- 5:41:03to commit to satisfying the
- 5:41:05responsibilities to which they have been
- 5:41:07assigned. Ensure each stakeholder has
- 5:41:10the skills required, receives any
- 5:41:12necessary training and in addition
- 5:41:15understand the stakeholders's capacity
- 5:41:17to work. How long can they spend on the
- 5:41:20project? Do they have any vacation time
- 5:41:22planned etc. Periodically follow up
- 5:41:27MBWAT. We've talked about before
- 5:41:29management by walking and talking.
- 5:41:32Periodically check in with each
- 5:41:34stakeholder. Keep an eye out for issues.
- 5:41:37Be accessible and provide the support
- 5:41:40that is needed to keep that stakeholder
- 5:41:43in a position to be able to achieve the
- 5:41:46roles and responsibilities to which
- 5:41:47they've been assigned.
- 5:41:50Project managers should always have
- 5:41:52empathy when it comes to dealing with
- 5:41:53hesitant stakeholders. Many people want
- 5:41:56to help. They're just overwhelmed at
- 5:41:58work. So have a conversation to figure
- 5:42:01out what is at the root of their
- 5:42:02hesitance to participate and explore
- 5:42:05ways that you might be able to help make
- 5:42:07their life easier. And lastly, if they
- 5:42:10just cannot commit to the role, start
- 5:42:12working on a plan B on someone else who
- 5:42:15can fill their shoes so timelines don't
- 5:42:17get delayed.
- 5:42:19When a stakeholder is really reluctant
- 5:42:22as far as taking on responsibilities,
- 5:42:24find out the reason why. Is there
- 5:42:26something else going on? Do they have a
- 5:42:28lot more on their plate than you realize
- 5:42:31or do they not understand the project?
- 5:42:34So, find out some more information. Go
- 5:42:36and have a one-on-one meeting with them.
- 5:42:39Find out how you can actually help them.
- 5:42:42Really understand the project a bit
- 5:42:44more. Offer assistance. Let them know
- 5:42:46how you will be a support system
- 5:42:48throughout the project as well.
- 5:42:50>> What an excellent and pertinent
- 5:42:51question. Everyone is motivated by
- 5:42:54different things. A good project manager
- 5:42:56tries to identify each individual's
- 5:42:59motivators. There's a gentleman named
- 5:43:01David Mlullen who many years ago
- 5:43:03developed a three needs theory. This
- 5:43:06theory states that people are motivated
- 5:43:08by one, two, or possibly three different
- 5:43:10factors. again have the conversation
- 5:43:13with the stakeholder and trying to
- 5:43:15determine which of these factors one two
- 5:43:17or three motivates them. So let's go
- 5:43:20ahead and take a look at Mlen's model.
- 5:43:22The first motivator is called
- 5:43:24achievement. Achievement is defined as
- 5:43:27gaining satisfaction from achieving
- 5:43:29results. Secondly, some people are
- 5:43:32motivated and driven by affiliation.
- 5:43:35Some people are motivated by working
- 5:43:37with others. they can build
- 5:43:39relationships, trust and respect with.
- 5:43:42If affiliation is a motivator, sell the
- 5:43:45stakeholder on the value of working with
- 5:43:47a great team. Motivate them through
- 5:43:50informing how they can build a lasting
- 5:43:52relationship and play a critical role in
- 5:43:55working together for the common success
- 5:43:57of the project.
- 5:43:59In Mlen's model, a third motivator is
- 5:44:02power, sometimes referred to as
- 5:44:04empowerment.
- 5:44:06If power or control are motivators, let
- 5:44:09the stakeholder know they are empowered
- 5:44:12to use their creativity and innovation
- 5:44:14to achieve the possibilities of the
- 5:44:17project. Share that the project culture
- 5:44:19is one of open communications and honest
- 5:44:22dialogue and feedback. Motivate the
- 5:44:25individual by providing assurance that
- 5:44:27their ideas will be valued and heard.
- 5:44:33[Music]
- 5:44:41Welcome to stakeholder engagement plan.
- 5:44:45After watching this video, you will be
- 5:44:47able to define a stakeholder engagement
- 5:44:49plan or SEP and its importance and
- 5:44:53describe how to create an SEP matrix. A
- 5:44:57stakeholder engagement plan or SEP is a
- 5:45:00formal document that outlines the
- 5:45:02strategy to communicate with
- 5:45:04stakeholders interested in a project. An
- 5:45:07SEP identifies stakeholders and their
- 5:45:09interest levels, power, and influence,
- 5:45:12and it is continuously updated to meet
- 5:45:14stakeholder needs. The goal of an SEP is
- 5:45:18to achieve the level of stakeholder
- 5:45:19commitment required to properly plan and
- 5:45:22execute a project. Note that this is a
- 5:45:25plan held close to one's vest. Only the
- 5:45:28core project team has access to this
- 5:45:30plan. After the project charter is
- 5:45:33authorized, this is the first finished
- 5:45:35plan. An SEP consists of the names of
- 5:45:39important stakeholders whose commitment
- 5:45:41to the project is crucial. The current
- 5:45:44state mentioning the level of commitment
- 5:45:46at present. The desired state mentioning
- 5:45:49the level of commitment that is ideal
- 5:45:51and required. and the strategy needed to
- 5:45:54move stakeholder commitment from the
- 5:45:56present state to the desired one. The
- 5:45:59SEP matrix is a tool to identify the
- 5:46:02level of engagement required of each
- 5:46:04stakeholder group based on their level
- 5:46:06of interest and influence in the
- 5:46:08project. The matrix identifies five
- 5:46:11distinct levels of commitment
- 5:46:13designators. Unaware, which indicates
- 5:46:16that the stakeholder is unaware of the
- 5:46:18project and its impacts. Neutral, which
- 5:46:21indicates that the stakeholder is aware
- 5:46:23of the project but has not determined
- 5:46:25the level of support they need to
- 5:46:27extend. Resistant, which indicates that
- 5:46:30the stakeholder does not support the
- 5:46:32project and is resistant to change.
- 5:46:34Supportive, which indicates that the
- 5:46:37stakeholder supports the project and is
- 5:46:39supportive of change. And leading, which
- 5:46:42indicates that the stakeholder is
- 5:46:44supportive and actively engaged in
- 5:46:46ensuring the project is a success.
- 5:46:49Consider the following scenario to
- 5:46:51understand an SEP better. John is
- 5:46:54managing a business application
- 5:46:56development project. In this project,
- 5:46:58Rahul is the sponsor and is quite
- 5:47:01supportive of the project. Mary is the
- 5:47:04customer and is not sure whether she
- 5:47:06agrees with the project. Ram is the
- 5:47:09subject matter expert or SME who does
- 5:47:11not support the project and thinks the
- 5:47:13project is a waste of time. Evan is an
- 5:47:16information technology or IT
- 5:47:18professional and supports the project
- 5:47:21and John wants Evan to perform some
- 5:47:23tasks related to the project. Shown here
- 5:47:27is the SEP matrix that clearly defines
- 5:47:30the roles of all stakeholders along with
- 5:47:32a strategy to involve them actively for
- 5:47:35project success.
- 5:47:37In this video, you learned that the
- 5:47:40stakeholder engagement plan or SEP is a
- 5:47:43document that includes project
- 5:47:45stakeholder names, current state, which
- 5:47:47indicates the stakeholder's present
- 5:47:49commitment level, desired state, which
- 5:47:52indicates the stakeholder's ideal
- 5:47:53commitment level, and the strategy the
- 5:47:56manager needs to move the stakeholder
- 5:47:58from the current to desired state. And
- 5:48:01the SAP matrix is a tool project
- 5:48:04managers use to identify the level of
- 5:48:06engagement required of each stakeholder
- 5:48:09group.
- 5:48:12[Music]
- 5:48:20Welcome to key financial metrics. After
- 5:48:23watching this video, you will be able to
- 5:48:26describe the importance of financial
- 5:48:28metrics and define some key financial
- 5:48:31metrics to determine a project's
- 5:48:32efficiency. Financial metrics are
- 5:48:35quantitative indicators that evaluate a
- 5:48:38company's financial performance and
- 5:48:40stability. These indicators assist
- 5:48:42investors and analysts to study data on
- 5:48:45various aspects of a company, including
- 5:48:47its revenue production, profitability,
- 5:48:50and financial stability. A project
- 5:48:53manager should know some key financial
- 5:48:55metrics such as opportunity cost, time
- 5:48:58value of money and depreciation.
- 5:49:02Opportunity costs are the possible
- 5:49:04benefits that a person, investor or
- 5:49:06company foregoes while deciding between
- 5:49:09two options. And this concept addresses
- 5:49:12project trade-offs. For example, the
- 5:49:15value of project A is $60,000 and
- 5:49:18project B's value is $40,000.
- 5:49:21You can only choose one project. So you
- 5:49:24select project B. By doing so, you lose
- 5:49:27the chance to benefit from project A's
- 5:49:30worth. Therefore, choosing project B has
- 5:49:33an opportunity cost of $60,000.
- 5:49:37In the case of multiple projects, the
- 5:49:39opportunity cost is always the value of
- 5:49:42the highest value project not chosen. 20
- 5:49:46years ago, $100 could buy more than what
- 5:49:48it does today. So some financial
- 5:49:51calculations consider the time value of
- 5:49:54money. The time value of money is a
- 5:49:56concept stating that the value of a
- 5:49:58currency decreases over time. However,
- 5:50:01the value of the currency increases if
- 5:50:04we invest the money. Invested money
- 5:50:07earns a return creating a more
- 5:50:09significant amount of money in the
- 5:50:11future.
- 5:50:12Depreciation determines an asset's value
- 5:50:15loss over time because of regular wear
- 5:50:18and tear, aging, and technological
- 5:50:20advancements. The devaluation of assets
- 5:50:24allows an organization to reduce its
- 5:50:26taxes and claim the lost value of the
- 5:50:28investment. There are two methods of
- 5:50:31calculating depreciation. The straight
- 5:50:33line method and accelerated
- 5:50:35depreciation.
- 5:50:37The simplest method of calculating
- 5:50:39depreciation is the straight line
- 5:50:41method. The amount of depreciation
- 5:50:43subtracted from an asset's value is the
- 5:50:46same for every year of its life. If an
- 5:50:49asset is worth $100,000 and depreciates
- 5:50:52by $20,000 annually over 5 years, in
- 5:50:56order to calculate annual deduction,
- 5:50:58divide the asset's value by its useful
- 5:51:01life. The accelerated depreciation
- 5:51:04method allocates a higher portion of an
- 5:51:06asset's cost in the early years of its
- 5:51:09life as compared to later years. And
- 5:51:11this approach considers that assets are
- 5:51:14more productive in their early years
- 5:51:16than later years. The accelerated
- 5:51:18depreciation method includes double
- 5:51:21declining balance and the sum of the
- 5:51:23year's digits. You will not need to know
- 5:51:26these depreciation calculations for the
- 5:51:28CAPM testing. Some additional financial
- 5:51:32metrics that influence the choice of
- 5:51:34projects are payback, return on
- 5:51:36investment, return on invested capital
- 5:51:39or ROIC, benefit cost ratio or BCR,
- 5:51:43economic value added or EVA, internal
- 5:51:47rate of return or IRR and net present
- 5:51:51value or NPV. The payback period is the
- 5:51:55time required to recover the initial
- 5:51:57cost of an investment. It is the break
- 5:51:59even point at which the total investment
- 5:52:02equals the total revenue. The payback
- 5:52:04period equals the initial investment
- 5:52:07divided by the periodic cash flow. The
- 5:52:10return on investment or ROI is a metric
- 5:52:13that tells us an investment's
- 5:52:15profitability. It determines the amount
- 5:52:18of investment return concerning the cost
- 5:52:20of investment. ROI equals the net profit
- 5:52:24divided by the investment cost and
- 5:52:26multiplied by 100. The return on
- 5:52:30invested capital or ROIC determines how
- 5:52:33well a company allocates capital to
- 5:52:36profitable projects or investments. It
- 5:52:39calculates the returns a company
- 5:52:40generates for every dollar invested in
- 5:52:43it. ROIC equals the net operating profit
- 5:52:47after taxes or notepad divided by the
- 5:52:50invested capital and multiplied by 100.
- 5:52:54For example, in a project where the
- 5:52:56investment is $100,000 and the firstear
- 5:53:00returns are $10,000, the ROIC will be
- 5:53:0410%. The benefit cost ratio or BCR is a
- 5:53:09technique to compare the benefits of a
- 5:53:11project with its costs. A BCR that is
- 5:53:15more significant than one indicates a
- 5:53:17profitable project. BCR is equal to the
- 5:53:21total benefits divided by the total
- 5:53:23costs. For example, in a project where
- 5:53:26the total benefits are $10,000 and the
- 5:53:29total costs are $8,000, the BCR will be
- 5:53:331.25.
- 5:53:35The economic value added or EVA measures
- 5:53:39the value a company generates for its
- 5:53:41shareholders. And this concept suggests
- 5:53:44that projects should provide returns
- 5:53:46beyond their cost of capital. When
- 5:53:48shareholders generate more wealth,
- 5:53:51profitability increases.
- 5:53:53The internal rate of return or irr is
- 5:53:57the discount rate that makes the net
- 5:53:59present value or NPV of a project zero.
- 5:54:03In order to calculate the IRR, the
- 5:54:06discount rate must be determined so that
- 5:54:08the present value of future cash flows
- 5:54:11equals the cost of initial investment.
- 5:54:13The IRR compares the efficiency of
- 5:54:16different investments and determines the
- 5:54:18project's profitability.
- 5:54:20Finally, the net present value or NVP is
- 5:54:24the difference between the present value
- 5:54:26of your cash inflows and the present
- 5:54:28value of your cash outflows over a
- 5:54:31period. To calculate NPV, you need to
- 5:54:35use a cash flow chart like an IRR cash
- 5:54:38flow chart and select a discount rate
- 5:54:40for devaluing returns. NPV provides the
- 5:54:44dollar value. The following scenario
- 5:54:47demonstrates how to use financial
- 5:54:49calculations to determine project
- 5:54:51benefits. A project has an investment
- 5:54:54valued at $100,000 and an annual return
- 5:54:57of $50,000.
- 5:54:59The payback is the break even point at
- 5:55:02which the total investment equals the
- 5:55:04total revenue which in this case is 2
- 5:55:07years. The ROI is 50%, the IRR is 23.38%
- 5:55:14and the NPV is $22,130.
- 5:55:19Note the IRR and NPV of the project were
- 5:55:22calculated using a formula in Microsoft
- 5:55:25Excel.
- 5:55:27In this video, you learned that
- 5:55:29financial metrics are quantitative
- 5:55:31indicators that evaluate a company's
- 5:55:33financial performance and stability. And
- 5:55:36key financial metrics project managers
- 5:55:39use include opportunity cost, time value
- 5:55:42of money, depreciation, payback, return
- 5:55:46on investment or ROI, return on invested
- 5:55:49capital or ROIC, benefit cost ratio or
- 5:55:53BCR, economic value added or EVA,
- 5:55:58internal rate of return or IRR, and net
- 5:56:01present value or NVP.
- 5:56:06[Music]
- 5:56:15Welcome to project budgets. After
- 5:56:18watching this video, you will be able to
- 5:56:21define budget levels of accuracy,
- 5:56:24summarize budget estimation models, and
- 5:56:27discuss key project budget
- 5:56:28considerations.
- 5:56:30A budget estimate approximates the time
- 5:56:33and resources required to plan and
- 5:56:35complete a project. Budget estimates are
- 5:56:38essential for planning and decision-m as
- 5:56:41they provide a framework for allocating
- 5:56:43resources and managing costs. There are
- 5:56:46two levels of budget estimates. Level
- 5:56:49one is rough order of magnitude or ROM
- 5:56:52and level two is definitive estimate.
- 5:56:56The project manager includes a rough
- 5:56:58order of magnitude or ROM estimate in
- 5:57:01the project charter and it provides
- 5:57:03decision makers with a broad parameter
- 5:57:05to determine if best and worstc case
- 5:57:08budget estimate limits are acceptable. A
- 5:57:11ROM estimate is - 255% to positive 75%.
- 5:57:16For example, a ROM for a $100,000 budget
- 5:57:19estimate might range from $75,000
- 5:57:23to $175,000.
- 5:57:26The definitive estimate level is the
- 5:57:28most exact estimate which the team
- 5:57:30determines after completing all project
- 5:57:33planning. And this level of budget
- 5:57:35estimation generally serves as the
- 5:57:38boundaries a budget needs to conform
- 5:57:40with before the project close. A
- 5:57:42definitive estimate is -5% to
- 5:57:45positive10%.
- 5:57:47For example, a definitive estimate for a
- 5:57:50$100,000 budget might range from $95,000
- 5:57:54to $110,000.
- 5:57:57So, you may wonder why there is an
- 5:58:00underbudget threshold. If a project ends
- 5:58:03under budget, the unused funds are
- 5:58:05returned to the organization. However,
- 5:58:08those unused funds sat idle throughout
- 5:58:10the project and were not providing a
- 5:58:13return on investment. 0% returns lose
- 5:58:16value due to inflation. If possible, a
- 5:58:20project manager and team should avoid
- 5:58:22being over and dramatically underbudget.
- 5:58:26There are several estimation models
- 5:58:28project managers use to determine
- 5:58:30project costs. A project budget
- 5:58:32generally uses multiple models based on
- 5:58:35the cost categories under analysis. And
- 5:58:38these estimation models include
- 5:58:40analogous, parametric, and bottom up.
- 5:58:44With the analogous estimation model, the
- 5:58:46project manager compares the current
- 5:58:48project to similar past projects and
- 5:58:51uses that data to estimate the costs and
- 5:58:53resources required for the current
- 5:58:56project. The analogous model is also
- 5:58:59called expert or top-down estimation and
- 5:59:02it is most reliable when the previous
- 5:59:05projects are similar in fact and not
- 5:59:08just in appearance. With the parametric
- 5:59:11estimation model, the quantity of work
- 5:59:13that the team is to perform is
- 5:59:15multiplied by the productivity rate of
- 5:59:18the team. And this model uses regression
- 5:59:21analysis and learning curve techniques.
- 5:59:24For example, if 30 drawings are required
- 5:59:27and the cost is $100 for each drawing,
- 5:59:30the total cost would be $3,000.
- 5:59:33And in this example, the drawings are
- 5:59:35the quantity of work and the
- 5:59:37productivity rate is $100. The
- 5:59:41parametric model is also called a
- 5:59:43mathematical model. Finally, with the
- 5:59:46bottomup estimation model, the project
- 5:59:48manager estimates each work package
- 5:59:51individually and then compiles the total
- 5:59:54project costs. This model requires a
- 5:59:57work breakdown structure or WBS to be
- 6:00:00effective. And the bottomup model has a
- 6:00:03high level of accuracy in budget
- 6:00:05estimation.
- 6:00:07Now, project managers should remember
- 6:00:09these nine considerations when planning
- 6:00:11and executing a budget. Enlist the
- 6:00:14support of subject matter experts or
- 6:00:16SMEES. Their knowledge is critical to
- 6:00:19budget estimating success. Ask a team
- 6:00:22member to validate estimates and act as
- 6:00:24a second pair of eyes to catch any
- 6:00:26mistakes. Track planned versus actual
- 6:00:29expenditures throughout the project to
- 6:00:31recognize variances early. Proactively
- 6:00:34make course corrections and share
- 6:00:36project status with stakeholders.
- 6:00:39Validate all assumptions. use
- 6:00:41information and technology to assist in
- 6:00:44overall project cost management. The
- 6:00:47project management institute or PMI
- 6:00:50refers to these systems as the project
- 6:00:52management information systems. Use
- 6:00:55value added decision-making models such
- 6:00:57as analogous, parametric, or bottom up.
- 6:01:01Review past lessons learned to avoid
- 6:01:03past budget and planning mistakes and
- 6:01:06leverage opportunities previously
- 6:01:08discovered. Understand funding limit
- 6:01:10reconciliation.
- 6:01:12This PMI term means that funds allocated
- 6:01:15to your project must be used only on
- 6:01:18that project and any unused funds must
- 6:01:21be returned to the organization.
- 6:01:24And lastly, understand project funding
- 6:01:27requirements which is another PMI term.
- 6:01:30Let the sponsor know when project funds
- 6:01:32are needed and in most cases the entire
- 6:01:35project budget will not be available on
- 6:01:38day one.
- 6:01:40In this video, you learned that a budget
- 6:01:43estimate approximates the time and
- 6:01:45resources required to plan and complete
- 6:01:47a project. There are two levels of
- 6:01:50budget estimates. Level one is rough
- 6:01:52order of magnitude or ROM and level two
- 6:01:55is definitive estimate. Estimation
- 6:01:58models assist project managers in
- 6:02:00determining project costs. And three
- 6:02:02common models are analogous, parametric,
- 6:02:05and bottom up. And finally, there are
- 6:02:08nine considerations project managers
- 6:02:10should remember when planning and
- 6:02:13executing a budget.
- 6:02:17[Music]
- 6:02:24Welcome to expert viewpoints role of a
- 6:02:27business analyst. In this video we will
- 6:02:30hear from project managers discussing
- 6:02:32the role of a business analyst.
- 6:02:36The roles of a business analyst and
- 6:02:38project manager are similar in nature in
- 6:02:40that they both deal with stakeholder
- 6:02:42collaboration, risk management, change
- 6:02:46management, escalation management, and
- 6:02:49they're also both very involved in
- 6:02:51planning and forecasting, whether it's
- 6:02:53project planning and forecasting a
- 6:02:55timeline or business planning and
- 6:02:57forecasting a return on investment or a
- 6:03:00financial plan. areas where they're
- 6:03:02different, I think, is the uh how far in
- 6:03:05the weeds each each person or each
- 6:03:08person in those roles are. Uh as far as
- 6:03:10the project goes, I think the business
- 6:03:13analyst is going to be more holistically
- 6:03:16spread out across multiple projects or
- 6:03:18depending on the size of your company,
- 6:03:20you may only have one business analyst
- 6:03:22who's working across all of your
- 6:03:24projects. In that case, they're not
- 6:03:26going to be down in the weeds of the
- 6:03:28project like what the project manager
- 6:03:30would be. ensuring that action items are
- 6:03:33met, that there's agendas for meetings,
- 6:03:35meeting notes are going out, the
- 6:03:36timeline is being managed. Um, the
- 6:03:39project manager is going to look more at
- 6:03:41risk mitigation and then change
- 6:03:43management. I But that doesn't mean that
- 6:03:46the business analyst isn't involved in
- 6:03:48all of those. It's just not at the same
- 6:03:50level. It's at a little bit higher
- 6:03:52level. um where they may be at the same
- 6:03:55man level is the change management
- 6:03:57because that could have a financial
- 6:03:58impact depending on what is happening.
- 6:04:01Um regardless of the similarities and
- 6:04:03differences, the business analysts and
- 6:04:05the project manager really need to work
- 6:04:07handinand glove because each other each
- 6:04:10person in their roles influences the
- 6:04:12other person. The business analyst very
- 6:04:15much needs to consume the data from the
- 6:04:17projects and they need to make sure that
- 6:04:19it's accurate and accurately reflects
- 6:04:21the status of the project. The project
- 6:04:24manager needs to consume the financial
- 6:04:26planning that the business analyst is
- 6:04:28doing in order for them to do proper uh
- 6:04:31project forecasting and planning. So
- 6:04:34while there are differences between the
- 6:04:35goals of the business analyst and the
- 6:04:38goals of the project manager, they
- 6:04:40really need to work together as a team
- 6:04:41in order to be successful.
- 6:04:44>> First and foremost, a project manager
- 6:04:46and business analyst do work very
- 6:04:48closely together. Their roles very much
- 6:04:51intersect, but there is a distinction.
- 6:04:54The business analyst focuses on products
- 6:04:57and solutions. The project manager
- 6:05:00focuses on the processes performed to
- 6:05:03deliver a solution with sufficient
- 6:05:05quality. The business analyst work
- 6:05:08precedes the project management
- 6:05:10initiation phase. The business analyst
- 6:05:14performs an initial needs assessment,
- 6:05:17defines the current and 2B state,
- 6:05:20elicits requirements from customers, and
- 6:05:24provides potential solutions to the
- 6:05:26project manager. From that point, the
- 6:05:29project manager then develops the
- 6:05:32project charter and the formal project
- 6:05:34management begins.
- 6:05:37>> I think stakeholder management is a very
- 6:05:40important aspect of a business analyst's
- 6:05:42job. They're going to be working with
- 6:05:45people in a variety of roles and so
- 6:05:47understanding the expectations of each
- 6:05:50person that they're going to be
- 6:05:51providing data to is very critical. the
- 6:05:55the detail of data that you provide to
- 6:05:57somebody in a leadership position is
- 6:05:59going to be very different than the
- 6:06:01level of detail that you provide to the
- 6:06:03people on your project team or even to
- 6:06:06your direct manager. And so I think
- 6:06:08clarity of their expectations, your
- 6:06:11internal stakeholder expectations is
- 6:06:13important. Equally important are the
- 6:06:16client expectations and what data do
- 6:06:18they need to see on a regular basis that
- 6:06:21you're providing in addition to what
- 6:06:23data and what status is the project team
- 6:06:25providing. All of that leads to clear
- 6:06:28roles and responsibilities.
- 6:06:31And so if you're in a smaller
- 6:06:32organization, you may be doing a lot of
- 6:06:34different roles and b business analyst
- 6:06:36may just be one. And so you very clearly
- 6:06:39need to understand what your
- 6:06:40responsibilities are versus the project
- 6:06:42manager. If you're in a larger company
- 6:06:44and there's multiple business analysts,
- 6:06:46you also need to understand what you're
- 6:06:48going to do versus what another business
- 6:06:50analyst is going to do. And then the
- 6:06:53last tip for success is really ensuring
- 6:06:55that the data you're gathering is is
- 6:06:57accurate and that it's clear and that
- 6:06:59you're clearly able to represent it to
- 6:07:01the different people that you need to
- 6:07:03report it to so that they can take
- 6:07:05action or rest assured that everything
- 6:07:08is going fine.
- 6:07:10I could probably provide a number of
- 6:07:12tips, but let's go ahead and narrow it
- 6:07:14down to some of the key tips in my mind.
- 6:07:16First of all, understand the current
- 6:07:18business environment and how it is
- 6:07:21working. Be able to define the ASIS
- 6:07:24state to allow for needs assessment and
- 6:07:28analysis and development of a
- 6:07:30comprehensive 2B solution. Secondly,
- 6:07:34identify and analyze stakeholders who
- 6:07:37need to be involved in project
- 6:07:38development and develop the facilitation
- 6:07:41skills required to enable successful
- 6:07:44elicitation of requirements.
- 6:07:47Finally, surround yourself with subject
- 6:07:50matter experts who can help you
- 6:07:52understand the true needs of the
- 6:07:54customers and develop value added
- 6:07:56solutions. The most critical role that a
- 6:08:00business analyst can play or does play,
- 6:08:03the most critical aspect of a business
- 6:08:05analyst's job is data. Managing data,
- 6:08:08gathering it, collecting it, cleaning
- 6:08:10it, and then presenting it in a way
- 6:08:13that's meaningful for those who are
- 6:08:14going to consume it, regardless of where
- 6:08:16they are at in your company hierarchy.
- 6:08:19That's the most critical role. Almost
- 6:08:22equal to that is communication and the
- 6:08:24ability to work with your project teams
- 6:08:27to gather the data to work with the
- 6:08:29management and leadership teams to
- 6:08:31report the data and establish a very
- 6:08:34good rapport with your client so that
- 6:08:36they can also consume the data. Be
- 6:08:39pleasantly surprised.
- 6:08:41Also establishing rapport with your
- 6:08:43client is going to be critical so that
- 6:08:45you're commuting the communicating the
- 6:08:47data that they need in order to make
- 6:08:49current decisions and future decisions
- 6:08:52and remain a long-term customer.
- 6:08:55>> We could probably spend some time on
- 6:08:57this particular question because the
- 6:08:58business analyst provides some very
- 6:09:00critical support, but let's narrow it
- 6:09:03down to a few. First of all, the most
- 6:09:05critical job is the accomplishment of
- 6:09:07the comprehensive needs assessment.
- 6:09:11A clear definition of the ASIS state and
- 6:09:15the desired to be state is absolutely
- 6:09:18critical.
- 6:09:19Secondly, the business analyst works
- 6:09:21closely with organizational leadership
- 6:09:24to identify potential project
- 6:09:26opportunities andor problems. They
- 6:09:29assess the current state, develop the
- 6:09:32required future state, and generate
- 6:09:34solution options. I understand this is a
- 6:09:37repeat. However, they have to get this
- 6:09:40part right. Finally, they provide
- 6:09:43recommendations and develop develop road
- 6:09:46maps when solutions are approved. They
- 6:09:50may need to assemble business cases at
- 6:09:52times that pave the way for development
- 6:09:55of a project charter and a handoff to
- 6:09:58the project manager. So in summary, the
- 6:10:02most critical role played is to ensure
- 6:10:04all new projects are viable, validated
- 6:10:08solution proposals are provided that
- 6:10:11support organizational strategic
- 6:10:13initiatives and provide value.
- 6:10:18[Music]
- 6:10:26Welcome to scope planning. After
- 6:10:29watching this video, you will be able to
- 6:10:31summarize end-to-end scope planning,
- 6:10:34explain requirements planning, describe
- 6:10:36the contents of a scope statement,
- 6:10:39describe the contents of a work
- 6:10:40breakdown structure or WBS, and explain
- 6:10:44the importance of a WBS dictionary. The
- 6:10:48scope planning process includes
- 6:10:50identifying, outlining, and maintaining
- 6:10:52a project scope, and it is arguably the
- 6:10:55most critical project planning you will
- 6:10:58perform. The project management
- 6:11:00institute or PMI states that a project
- 6:11:03manager needs to accomplish the project
- 6:11:06on time, within budget, and within the
- 6:11:08required scope. In the real world,
- 6:11:11however, if you don't deliver scope that
- 6:11:13adds value, being on time and within
- 6:11:16budget won't matter much. Now, the PMI
- 6:11:20has a four-step scope planning approach,
- 6:11:22and it is a solid conceptual model that
- 6:11:25works in real working situations. The
- 6:11:27four steps are plan scope management,
- 6:11:30collect requirements, define scope, and
- 6:11:33create a work breakdown structure or
- 6:11:35WBS.
- 6:11:37The first step is to plan scope
- 6:11:39management. The PMI recommends that the
- 6:11:42project manager develop and share a
- 6:11:44scope management plan. This is not the
- 6:11:47final scope, but is a simple plan that
- 6:11:49provides process and direction to the
- 6:11:52team on how to define, develop, monitor,
- 6:11:55control, and validate scope. And this
- 6:11:58how-to plan describes how the project
- 6:12:00manager analyzes, documents, and manages
- 6:12:04requirements.
- 6:12:05The next step in scope planning is
- 6:12:07requirements planning which the PMI
- 6:12:10refers to as the collect requirements
- 6:12:12process in which the project manager
- 6:12:15reviews the project charter and other
- 6:12:17applicable documentation.
- 6:12:19Here are some important points to
- 6:12:21remember for the requirements planning
- 6:12:22process. The project manager provides
- 6:12:25requirements documentation that defines
- 6:12:27the requirements in the project scope.
- 6:12:30The goal of this phase is to summarize
- 6:12:33project charter requirements. Strive for
- 6:12:35actionable and measurable requirements
- 6:12:38and define them in terms of action and
- 6:12:40result. For example, acquire a venue. If
- 6:12:44the business analyst did not previously
- 6:12:46develop a project traceability matrix,
- 6:12:48the manager or analyst develops it at
- 6:12:51this point. The following scenario
- 6:12:54describes a simple project that shows an
- 6:12:56example of scope planning documentation.
- 6:12:59A manufacturing firm is planning an all
- 6:13:01hands meeting and you are the project
- 6:13:04manager. These are key excerpts from the
- 6:13:06project charter for this scenario. The
- 6:13:09event time and date have been set and
- 6:13:11the venue is still to be determined. The
- 6:13:13firm is to provide transportation for
- 6:13:16attendees and catering will be provided.
- 6:13:18The number of attendees and speakers has
- 6:13:21been determined and the firm will
- 6:13:23provide technical support for the event.
- 6:13:26As the project manager, you would now
- 6:13:28determine the scenario collection
- 6:13:30requirements for this project based on
- 6:13:32the information provided by the project
- 6:13:34charter. Acquiring the venue, planning
- 6:13:37transportation, planning catering,
- 6:13:40identifying speakers, and planning
- 6:13:42audiovisisual and technical support. The
- 6:13:45next step in scope planning is defining
- 6:13:47scope by developing a scope statement.
- 6:13:50The PMI states that a scope statement is
- 6:13:53the most detailed version of the scope
- 6:13:55and it clearly explains the project's
- 6:13:57aims. The scope statement has four
- 6:14:00components. Scope description or
- 6:14:02overview, deliverables, acceptance
- 6:14:05criteria, and exclusions. Here is an
- 6:14:08example scope statement describing the
- 6:14:10project scenario to plan and implement
- 6:14:12an all hands meeting in four ways. This
- 6:14:16document describes the project, lists
- 6:14:18all requirements or deliverables,
- 6:14:20identifies who can accept the final
- 6:14:22deliverables, and lists exclusions.
- 6:14:26Exclusions are a list of what the
- 6:14:28project will not provide. Now, the last
- 6:14:31step is to construct the work breakdown
- 6:14:33structure. A WBS breaks down the scope
- 6:14:37statement into a hierarchical list of
- 6:14:39tasks necessary to fulfill the project
- 6:14:42requirements. The hierarchy plan runs
- 6:14:45from most general starting with the
- 6:14:47whole project through the project phases
- 6:14:49to the specific tasks known as work
- 6:14:52packages. A best practice is to break
- 6:14:55down the work packages using logical
- 6:14:57phasing and the project manager should
- 6:15:00use the plan do check act or PDCA
- 6:15:04method. All WBS work packages should be
- 6:15:07actionable, estimable and measurable.
- 6:15:11This is an example of a WBS using the
- 6:15:14project scenario. The WBS is a
- 6:15:17hierarchical breakout of the project, a
- 6:15:20visual road map. It looks like an
- 6:15:22organizational chart with the project in
- 6:15:24the top row, then breaking down into
- 6:15:27project phase columns in the second row
- 6:15:30of boxes, followed by rows of boxes with
- 6:15:33the activities required or work packages
- 6:15:36for each phase in the order they occur
- 6:15:38below that. The first project phase
- 6:15:41column in the second row represents
- 6:15:43planning the project. The second column
- 6:15:46is the next phase executing the project
- 6:15:48and so on. Now after the project manager
- 6:15:52constructs the WBS, it is essential to
- 6:15:55complete the WBS dictionary. This
- 6:15:58document defines the tasks required to
- 6:16:01accomplish a WBS work package. Some
- 6:16:04points to remember while completing the
- 6:16:06WBS dictionary are each work package in
- 6:16:10the WBS is broken out into specific
- 6:16:13tasks. The manager should assign a lead
- 6:16:16team member to each work package and the
- 6:16:19WBS dictionary becomes the primary
- 6:16:22source for the team to check the
- 6:16:23progress status throughout the project.
- 6:16:26This example WBS dictionary based on our
- 6:16:30scenario breaks out the specific tasks
- 6:16:32for the first activity or work package.
- 6:16:35Manage the venue listed under our first
- 6:16:38phase in the WBS. The manage the venue
- 6:16:41specific tasks are research available
- 6:16:44venues, select the appropriate venue,
- 6:16:47and sign the contract.
- 6:16:50In this video, you learned that the
- 6:16:52scope planning process is the manager's
- 6:16:54most critical project planning area. The
- 6:16:57PMI has a four-step scope planning
- 6:17:00approach which includes plan scope
- 6:17:02management, collect requirements, define
- 6:17:05scope, and create a WBS. A scope
- 6:17:08statement is the most detailed version
- 6:17:10of the project scope. A WBS breaks down
- 6:17:14the scope statement into a list of
- 6:17:17tasks. And finally, a WBS dictionary
- 6:17:20defines the tasks required to accomplish
- 6:17:23a WBS work package.
- 6:17:28[Music]
- 6:17:36Welcome to schedule planning. After
- 6:17:39watching this video, you will be able to
- 6:17:42explain schedule planning and the steps
- 6:17:44involved, discuss types of dependencies,
- 6:17:47and illustrate a project network
- 6:17:49diagram.
- 6:17:50Schedule planning is the process of
- 6:17:52organizing and arranging tasks, events,
- 6:17:55and activities in a structured manner to
- 6:17:58allocate time and resources effectively.
- 6:18:01It involves setting up priorities,
- 6:18:03determining available time slots, and
- 6:18:06using tools and techniques to plan and
- 6:18:09monitor progress toward meeting goals
- 6:18:11and deadlines. Schedule planning aims to
- 6:18:14improve efficiency and productivity by
- 6:18:17ensuring tasks are completed promptly
- 6:18:19and in an organized manner. The Project
- 6:18:22Management Institute or PMI has
- 6:18:25developed a five-step schedule planning
- 6:18:27approach. Create a schedule management
- 6:18:30plan. Define activities, sequence
- 6:18:32activities, estimate activity durations,
- 6:18:35and develop a schedule. The first step
- 6:18:38is to create a schedule management plan.
- 6:18:41A project manager creates a schedule
- 6:18:43plan to specify the beginning and end
- 6:18:46dates of a project, the key checkpoints
- 6:18:48along the route, and a deadline to
- 6:18:50finish each job individually. The second
- 6:18:54step is to define activities. The
- 6:18:56manager lists the tasks, activities, and
- 6:18:59events to include in the schedule. Each
- 6:19:02activity must be defined to the point
- 6:19:04where time and cost durations can be
- 6:19:07reasonably estimated. Avoid ambiguity.
- 6:19:11Next, the project manager carefully
- 6:19:13considers each activity to determine
- 6:19:15which ones are dependent on others to be
- 6:19:18completed. All project dependencies must
- 6:19:21be defined so the manager can
- 6:19:23appropriately schedule the work and
- 6:19:25prevent delays. And after establishing
- 6:19:28dependencies among the activities, the
- 6:19:30manager can sequence them to create an
- 6:19:32effective flow. Project managers use the
- 6:19:36threepoint method to determine how long
- 6:19:38each work package will take. And this
- 6:19:40method can be applied to both time and
- 6:19:43cost durations. So there are a few terms
- 6:19:46associated with this method. The first
- 6:19:49is predecessor which defines an activity
- 6:19:51that happened first. Another term is
- 6:19:54successor which is the activity that
- 6:19:57happened second. In this illustration,
- 6:20:00activity A is the predecessor to
- 6:20:02activities B and C and activities B and
- 6:20:05C are the successors to activity A.
- 6:20:08Activities B and C depend upon the
- 6:20:11completion of activity A. Activities B
- 6:20:14and C do not depend on each other. The
- 6:20:18team can accomplish these activities
- 6:20:20simultaneously.
- 6:20:22The PMI shares four distinct dependency
- 6:20:24determinations. Mandatory dependencies
- 6:20:27are legally required or inherent. The
- 6:20:30team cannot ignore them. These
- 6:20:33dependencies can impact the overall
- 6:20:35timeline and schedule of a project.
- 6:20:38Examples of mandatory dependencies
- 6:20:40include part sourcing before assembling
- 6:20:43and hardware installation before
- 6:20:45software installation. An external
- 6:20:48dependency involves factors that are
- 6:20:50external to the project and these
- 6:20:53factors are usually legal or regulatory
- 6:20:56by nature. Examples of external
- 6:20:58dependencies include approvals from
- 6:21:01external organizations or government
- 6:21:04agencies, availability of resources or
- 6:21:07equipment sourced from outside
- 6:21:09suppliers, and compliance with
- 6:21:11regulations or laws. Internal dependency
- 6:21:15refers to a situation where a task in a
- 6:21:18project depends on other tasks in the
- 6:21:20project for completion. And this creates
- 6:21:23a relationship between tasks and a
- 6:21:25sequence for their completion.
- 6:21:27Typically, the project manager and team
- 6:21:30have complete control over these
- 6:21:32dependencies. An example of an internal
- 6:21:35dependency is the internal testing of
- 6:21:37project components before the project is
- 6:21:40assembled. And the final type of
- 6:21:43determination is a discretionary
- 6:21:45dependency. Sometimes there may be more
- 6:21:47than one way to accomplish a task and
- 6:21:50the project management team must decide
- 6:21:52which method to follow. The decision is
- 6:21:55based on their experience, best
- 6:21:57practices, and lessons learned. An
- 6:22:00example of a discretionary dependency
- 6:22:02can be best explained with a scenario.
- 6:22:05Activity A is booking an airline ticket
- 6:22:08and activity B is buying travel
- 6:22:11insurance. The project team can either
- 6:22:14book an airline ticket before buying
- 6:22:16travel insurance or do it the other way
- 6:22:18around. Now, returning to the five-step
- 6:22:21schedule planning approach, in the
- 6:22:23fourth step, the project manager and the
- 6:22:26team members must estimate how long each
- 6:22:29activity or work package will take to
- 6:22:31complete. And the best way to estimate
- 6:22:34the duration is to use data from similar
- 6:22:37past activities.
- 6:22:39Finally, the project manager and the
- 6:22:41team members develop the final schedule.
- 6:22:44The manager informs the sponsor and
- 6:22:46important stakeholders about this
- 6:22:48schedule for review and approval. And
- 6:22:51once the sponsor and stakeholders do
- 6:22:53approve the schedule, it becomes the
- 6:22:55project schedule baseline. A network
- 6:22:58diagram is a useful tool that shows how
- 6:23:01all work packages need to be
- 6:23:03accomplished and in what order. A work
- 6:23:06breakdown structure or WBS is required
- 6:23:09to build a network diagram. The diagram
- 6:23:12shows the flow of activities,
- 6:23:14dependencies and the critical path which
- 6:23:17helps in project planning, monitoring
- 6:23:19and control. The following scenario
- 6:23:22shows how a network diagram is built.
- 6:23:25The nodes in the diagram represent tasks
- 6:23:28while the arrows represent the
- 6:23:30dependencies between them. This project
- 6:23:32has five activities. Activities A and B
- 6:23:36have no dependencies and can be
- 6:23:38accomplished simultaneously. Activity C
- 6:23:41depends upon completing activities A and
- 6:23:44B. Activities D and E can also be
- 6:23:48accomplished simultaneously. They are
- 6:23:50both dependent upon the completion of
- 6:23:53activity C before work can begin. The
- 6:23:56final step in building a network diagram
- 6:23:59is to add the durations to each activity
- 6:24:02as shown in the illustration.
- 6:24:04Durations are determined by days.
- 6:24:07Activity A will take 5 days. Activity B
- 6:24:10will take 3 days and so on. Now that the
- 6:24:14network diagram is complete, the next
- 6:24:16task is to determine how many paths are
- 6:24:19possible to complete the project. This
- 6:24:21example has four paths and the critical
- 6:24:24path is the path with the longest
- 6:24:26duration. In this example, the longest
- 6:24:29path is ACCE. The critical path
- 6:24:32identifies the duration of the project.
- 6:24:35The duration of each activity is summed
- 6:24:38up to calculate the critical path. In
- 6:24:40this example, activity A's duration is
- 6:24:435, activity C's is 8, and activity E's
- 6:24:47is 7. So 5 + 8 + 7 = 20 and the critical
- 6:24:52path is 20 days. The final step in
- 6:24:56schedule planning is ensuring that
- 6:24:58sponsors and important stakeholders are
- 6:25:00informed about the network diagram and
- 6:25:03length. The project manager obtains
- 6:25:05approval from the stakeholder and the
- 6:25:07sponsor and the schedule baseline is
- 6:25:10finalized.
- 6:25:12In this video, you learned that schedule
- 6:25:14planning is the process of organizing
- 6:25:17and arranging tasks, events, and
- 6:25:19activities in a structured manner. The
- 6:25:22PMI's five-step planning approach
- 6:25:24includes planning schedule management,
- 6:25:27defining activities, sequencing
- 6:25:29activities, estimating activity
- 6:25:31duration, and developing a schedule. The
- 6:25:34four types of dependency determinations
- 6:25:37are mandatory, external, internal, and
- 6:25:40discretionary. A network diagram is a
- 6:25:44useful tool for visualizing and
- 6:25:46analyzing a project schedule. And the
- 6:25:49critical path is the path of the longest
- 6:25:51duration of a project.
- 6:25:56[Music]
- 6:26:04Welcome to a short project budgeting
- 6:26:06demo. In this demo, we will illustrate
- 6:26:09tools used in building and presenting a
- 6:26:11project budget and share a common
- 6:26:14estimation methodology called
- 6:26:16threepoint.
- 6:26:18Let's begin with a two-step approach to
- 6:26:20build a project budget. Step number one
- 6:26:23is to begin with a review of the total
- 6:26:25costs for the project. A simple Excel
- 6:26:28spreadsheet will often suffice. Break
- 6:26:31out the costs by direct, indirect, and
- 6:26:34reserve requirements.
- 6:26:36A general rule is that contingency
- 6:26:38reserves are usually 10% times direct
- 6:26:41costs. Management reserves are for
- 6:26:44unknown risks. If you suspect there are
- 6:26:47many unknown risks, add additional
- 6:26:49contingency under the management
- 6:26:51reserves. Let's look at a simple
- 6:26:54example. This is a project for the
- 6:26:57annual executive meeting support
- 6:27:00project. We begin by defining our costs.
- 6:27:05In this particular case, you'll notice
- 6:27:07we have them categorized by venue, setup
- 6:27:10and venue, cleanup, audiovisisual, etc.
- 6:27:14Next, we tried to determine if they are
- 6:27:16direct or indirect costs. As you notice
- 6:27:20in the notes, a direct cost is a cost
- 6:27:23that is charged to the project. So,
- 6:27:26let's find our first example. You'll
- 6:27:28notice that under direct cost, setup and
- 6:27:31venue cleanup, contractor supported,
- 6:27:34this is a direct costs. This means that
- 6:27:36the project manager needs to acquire
- 6:27:39$2,000 and the project will be required
- 6:27:42to go ahead and disperse those funds to
- 6:27:45the contractor. But we have another type
- 6:27:48of costs as well. These are indirect
- 6:27:50costs. Looking at our notes, indirect
- 6:27:53costs, these are paid for by an external
- 6:27:56source. If these costs were not paid by
- 6:27:59an external source, the project would
- 6:28:01need to plan and account for them. So
- 6:28:04let's look at our example. The first
- 6:28:06indirect cost we come to is $3,000.
- 6:28:10What is this for? Going across to the
- 6:28:12cost description. This is for the venue.
- 6:28:14But you'll notice we have a note. This
- 6:28:16is going to be paid for by the
- 6:28:18organization. So while the project is
- 6:28:20not paying for the venue, this is a cost
- 6:28:24to the project. It's just being paid for
- 6:28:27by another third party.
- 6:28:31In calculating the total costs of a
- 6:28:33project, we add up all of the direct
- 6:28:36costs, in this particular case, $6,000,
- 6:28:39and all of the indirect costs, in this
- 6:28:41case, $5,000. Our total project costs
- 6:28:45are $11,000.
- 6:28:48One last piece of information, we need
- 6:28:51to go ahead and calculate contingency
- 6:28:53reserves. Contingency reserves are those
- 6:28:56extra dollars that are set aside in case
- 6:28:59risks occur. Normally, contingency
- 6:29:02reserves are 10% times the direct costs.
- 6:29:06So, if you look at this illustration, we
- 6:29:09have $600. We take 10%, we multiply it
- 6:29:13by 6,000, and we end up with $600. This
- 6:29:17is dollars that we do not have access to
- 6:29:21unless we request them. However, they
- 6:29:23are available in case a risk occurs.
- 6:29:27Now, let's take a look at step two.
- 6:29:30Here, we determine when the funds are
- 6:29:33needed. You need to phase your project
- 6:29:36funding requirements for a real world
- 6:29:39project. Allocating costs to each work
- 6:29:41package or activity in the work
- 6:29:43breakdown structure and using your
- 6:29:46network diagram to determine when costs
- 6:29:49will be incurred is a best practice.
- 6:29:51Here's how that calculation could work.
- 6:29:55But remember, only request direct costs.
- 6:29:59Ensure what you are asking for matches
- 6:30:02your direct cost requirements in step
- 6:30:04one. And as a refresher, that was
- 6:30:07$6,000.
- 6:30:11So on this particular
- 6:30:13sheet, we take a look at our direct cost
- 6:30:15requirements.
- 6:30:17And now we break them out into phases.
- 6:30:20Phase one is planning. Phase two is the
- 6:30:24day of the meeting. And phase three is
- 6:30:27the post meeting. These dates are
- 6:30:30February 15th for planning, February
- 6:30:3320th for the day of the meeting and the
- 6:30:37post meeting on February 24th.
- 6:30:40Now, we share the direct costs and we
- 6:30:44annotate them when these dollars will be
- 6:30:47required. So, we're going to require
- 6:30:50$2,500
- 6:30:51on February 15th to support planning.
- 6:30:55This will pay for setting up the venue
- 6:30:57and general supplies. On the day of the
- 6:31:00meeting, we need $2,500
- 6:31:03in our account. We're going to pay
- 6:31:06$1,000
- 6:31:07to clean up the venue, 500 for
- 6:31:10beverages, $1,000 for catering. And on
- 6:31:14February 24th, we will pay the final
- 6:31:18payment for the catering, $1,000.
- 6:31:21Notice 2500
- 6:31:242500 $1,000 equals $6,000.
- 6:31:28This was our direct cost requirements.
- 6:31:33This concludes part one of our demo
- 6:31:35video. We look forward to seeing you
- 6:31:38again in part two.
- 6:31:42[Music]
- 6:31:51Welcome back. We hope you enjoyed part
- 6:31:53one of our demo. Welcome to part two.
- 6:31:57Now, you may choose to use a tool called
- 6:32:00a resource breakdown structure. This is
- 6:32:04also generally an Excel spreadsheet, and
- 6:32:07it can help accomplish both steps one
- 6:32:10and two on a single spreadsheet. Let's
- 6:32:13use the executive meeting project to
- 6:32:15show how this could work. Costs are
- 6:32:18captured under categories and work
- 6:32:21breakdown structure activity numbers.
- 6:32:24Match the activity numbers to your
- 6:32:26schedule network diagram to determine
- 6:32:28when funds are required. Again, only
- 6:32:32document direct funds.
- 6:32:34So, let's take a look at this particular
- 6:32:38spreadsheet. The resource breakdown
- 6:32:40structure for the annual executive
- 6:32:42meeting support project.
- 6:32:45Each work breakdown structure activity
- 6:32:48has its individual number.
- 6:32:51The work package explains what is
- 6:32:54happening in each work breakdown
- 6:32:56structure activity. For example,
- 6:32:58activity 111 is to define the venue. 112
- 6:33:03is to determine attendees.
- 6:33:06Now, what we need to do is we need to
- 6:33:09determine during which of these
- 6:33:11activities will our total of $6,000 be
- 6:33:15required. So, if you take a look, we
- 6:33:19have a $1,000 requirement for venue
- 6:33:21support. If you recall from our previous
- 6:33:24step, this will occur during planning
- 6:33:28and the funds will be required on the
- 6:33:3015th of February.
- 6:33:32We have general supply requirements that
- 6:33:35will be required on the 15th of February
- 6:33:38as well. Now during the actual event we
- 6:33:42need to pay for beverages, catering and
- 6:33:46in addition actual meeting requirements
- 6:33:50in this case to support the catering.
- 6:33:53These funds are required on the 20th of
- 6:33:56February and we're going to pay the
- 6:33:59outstanding catering invoice on the
- 6:34:0124th. Again take a look at the totals.
- 6:34:06The total requirement is our direct cost
- 6:34:09of $6,000.
- 6:34:12Now, one final area that we want to
- 6:34:16discuss regards estimation.
- 6:34:19There is a methodology that is commonly
- 6:34:22used called threepoint estimation.
- 6:34:25Many project managers use singlepoint
- 6:34:28estimation. They estimate time and costs
- 6:34:31by providing their best guess. There are
- 6:34:34some costs that are set. When this is
- 6:34:37the case, single point estimation
- 6:34:39suffices. In most cases, however,
- 6:34:42estimates may be impacted by a variety
- 6:34:45of factors. Threepoint averaging
- 6:34:49requires the project manager and the
- 6:34:51team to analyze three estimates.
- 6:34:54The most likely estimate is what the
- 6:34:57team believes will be the most likely
- 6:34:59costs. The pessimistic estimate
- 6:35:02considers risk and the worstc case
- 6:35:04scenario. The optimistic estimate
- 6:35:07considers opportunities that may reduce
- 6:35:10costs. There are two ways to calculate
- 6:35:13threepoint.
- 6:35:15Note that the threepoint estimation is
- 6:35:17applicable to both cost and schedule
- 6:35:20estimates.
- 6:35:22So looking at threepoint averaging, we
- 6:35:26have an pessimistic amount of 45. Most
- 6:35:30likely it's going to cost us 25. And if
- 6:35:34everything works out perfectly, we may
- 6:35:37escape with only spending 20. Each one
- 6:35:41of the pessimistic, most likely, and
- 6:35:44optimistic numbers and estimates are
- 6:35:47multiplied by one. We multiply the
- 6:35:50pessimistic 45 * 1 = 45. Most likely 25
- 6:35:55* 1 = 25. Optimistic 20 * 1 = 20. 45 25
- 6:36:02and 20 equals 90. We divide this 90 by 3
- 6:36:07and the estimate that we're going to go
- 6:36:09ahead and use is 30.
- 6:36:14Now we have something called threepoint
- 6:36:17estimation using per stands for program
- 6:36:21evaluation review technique. And this
- 6:36:24method is a little more complicated than
- 6:36:26the averaging method. The per method
- 6:36:29weighs the optimistic, most likely and
- 6:36:32pessimistic estimates based on
- 6:36:34statistical norms. Studies have shown
- 6:36:37that the pessimistic and optimistic
- 6:36:40estimates will occur one out of every
- 6:36:43six times. The most likely estimate will
- 6:36:46occur four out of every six times. This
- 6:36:49weighted criterion is based on the
- 6:36:52conclusion that estimation accuracy
- 6:36:55follows a statistical standard
- 6:36:58distribution. The most likely falls
- 6:37:00within one standard deviation of the
- 6:37:02mean or approximately 67% of the time.
- 6:37:07The optimistic and pessimistic estimates
- 6:37:09fall within two or more standard
- 6:37:11deviations from the mean or
- 6:37:13approximately 16% for both. Hence the
- 6:37:18weights 1 4 and 1. Use the per method in
- 6:37:22our example. Let's go ahead and take a
- 6:37:25look. We have our optimistic, most
- 6:37:29likely and pessimistic
- 6:37:32estimates. They have not changed.
- 6:37:34However, the multipliers do. We multiply
- 6:37:37the pessimistic by one. 1* 45 for 45.
- 6:37:43Why? Because the pessimistic is going to
- 6:37:45occur one out of every six times. We
- 6:37:49multiply the most likely estimate of 25
- 6:37:52* 4 to equal 100. Why? According to the
- 6:37:56standard distribution, the most likely
- 6:37:59normally occurs four out of six times or
- 6:38:0167%.
- 6:38:04We multiply the optimistic 20 * 1 to
- 6:38:07equal 20. Why? Because the optimistic is
- 6:38:10only going to occur one out of every six
- 6:38:13times or approximately 16%.
- 6:38:16We add up our totals 45, 12, 120 to get
- 6:38:20to 165. However, we're now going to
- 6:38:24divide 165 by 6. When we take 165 and
- 6:38:30divide it by 6, now the estimate that
- 6:38:33we're going to use is 27.5.
- 6:38:37This concludes our overview of project
- 6:38:40budgeting. As a quick summary, remember
- 6:38:44we have two steps
- 6:38:48or we can combine the two steps with one
- 6:38:52step called the resource breakdown
- 6:38:54structure. And we learned an estimation
- 6:38:56technique called threepoint. Thank you
- 6:38:59for your attention and we look forward
- 6:39:01to sharing more project management best
- 6:39:04practices with you in demos to follow.
- 6:39:07Have a great rest of your day.
- 6:39:11[Music]
- 6:39:19Welcome to project support planning.
- 6:39:22After watching this video, you will be
- 6:39:24able to explain project support planning
- 6:39:27and discuss key objectives in project
- 6:39:30support planning. Project support
- 6:39:33planning is identifying and managing the
- 6:39:35resources and support needed to
- 6:39:37successfully execute a project. This
- 6:39:40involves including personnel, equipment,
- 6:39:43technology, training, and financial
- 6:39:45resources. It begins after the scope,
- 6:39:49schedule, and cost baselines are
- 6:39:51approved and accepted. The key
- 6:39:53objectives of support planning include
- 6:39:56quality management planning, resource
- 6:39:58breakdown structure, communications
- 6:40:00management plan, risk planning,
- 6:40:03procurement planning, and stakeholder
- 6:40:05engagement planning. Quality management
- 6:40:08planning involves the development of a
- 6:40:10plan to ensure that the project
- 6:40:12deliverables meet the required quality
- 6:40:14standards. A quality management plan
- 6:40:17documents the methods and guidelines
- 6:40:20applied in quality management. And this
- 6:40:22plan also describes quality assurance
- 6:40:25planning and quality control planning.
- 6:40:28The resource breakdown structure
- 6:40:30visually represents the project's
- 6:40:32resource requirements and it divides
- 6:40:34those resources into smaller, easier to
- 6:40:37manage components. Here is an example of
- 6:40:40an RBS that specifies the planning and
- 6:40:43managing of resources. Create a column
- 6:40:46that lists people responsible for each
- 6:40:48work package. You may also enlarge the
- 6:40:51RBS to include start and finish dates
- 6:40:54for every WBS work package. Now, a
- 6:40:57communications management plan outlines
- 6:41:00the communication requirements and
- 6:41:02expectations for a project. It is
- 6:41:04developed by the project manager during
- 6:41:07support planning and approved by the
- 6:41:09sponsor. This plan identifies key
- 6:41:12communication items, assigns team leads
- 6:41:14to each item, provides audience and
- 6:41:17media information, outlines timing
- 6:41:20issues, and states the purpose of the
- 6:41:22communication. Here is an illustration
- 6:41:25with a sample entry.
- 6:41:27Risk planning is the process of
- 6:41:29identifying, evaluating, and managing
- 6:41:32risks to reduce their influence on a
- 6:41:34project or organization. It includes the
- 6:41:38following three elements. Plan risk
- 6:41:40management, identify risks, and monitor
- 6:41:43risk. The first step is to develop a
- 6:41:46riskmanagement plan that outline shared
- 6:41:49methods, roles, and responsibilities and
- 6:41:52risk scoring standards. The second step
- 6:41:55is to identify risks. To accomplish this
- 6:41:58step, evaluate the project and record
- 6:42:00the risks. This helps to create
- 6:42:03solutions to lessen threats and increase
- 6:42:05opportunities. And the last step is to
- 6:42:08monitor risks. Perform periodic
- 6:42:11reassessment of risks to monitor them.
- 6:42:13And this will help to determine any new
- 6:42:16tasks and implement risk responses
- 6:42:18whenever needed. Next, procurement
- 6:42:21planning is the process of identifying
- 6:42:23and procuring the products and services
- 6:42:26required to complete a project. It is
- 6:42:28essential to ensure that organizations
- 6:42:30are able to acquire the goods and
- 6:42:33services they need in a timely and
- 6:42:35cost-effective manner. This process
- 6:42:38involves developing a procurement
- 6:42:40management plan which includes all
- 6:42:42information and guidance necessary to
- 6:42:44manage the end-to-end procurement
- 6:42:46process. And the last plan is
- 6:42:49stakeholder engagement planning. It
- 6:42:51involves identifying and evaluating the
- 6:42:54stakeholders engaged in a project or
- 6:42:56initiative and successfully interacting
- 6:42:59with them throughout the project's life
- 6:43:01cycle. Involvement of stakeholders is
- 6:43:04essential to success. Therefore, the
- 6:43:06project manager and team assess each
- 6:43:09stakeholder's current and desired levels
- 6:43:12of commitment and develop strategies to
- 6:43:14sustain or achieve desired levels of
- 6:43:17commitment.
- 6:43:18In this video, you learned that project
- 6:43:21support planning is the identification
- 6:43:23and management of the resources and
- 6:43:26support a project requires for
- 6:43:28successful execution. And the key
- 6:43:30objectives of project support include
- 6:43:33quality management planning, resource
- 6:43:35breakdown structure, communications
- 6:43:37management plan, risk planning,
- 6:43:40procurement planning, and stakeholder
- 6:43:42engagement planning.
- 6:43:45[Music]
- 6:43:54Welcome to a brief demonstration on
- 6:43:56earned value management or EVM as it's
- 6:43:59referred to. Earned value management as
- 6:44:02you can see on this illustration is
- 6:44:04defined as a method used to determine
- 6:44:07the scope, budget, and schedule of a
- 6:44:10given project at a given point in time.
- 6:44:14EVM is an area of concentration on the
- 6:44:17project management institutees project
- 6:44:20management professional PMP and
- 6:44:22certified associate of project
- 6:44:24management CAPM certification
- 6:44:27examinations.
- 6:44:29It is also a focus area on a number of
- 6:44:32additional PMI certification tests as
- 6:44:35well. In this demo, we will define four
- 6:44:38key measurements that are required to
- 6:44:40calculate EVM. They are abbreviated as
- 6:44:44BAC, PV, EV, and AC. We will then share
- 6:44:49an analysis of a sample project. We will
- 6:44:53finish the demo by walking you through
- 6:44:57seven key calculations that can help us
- 6:44:59understand the status of a project. So
- 6:45:02let's begin by defining the key
- 6:45:04measurements and providing status for
- 6:45:06this particular project. The first key
- 6:45:09measurement is called budget at
- 6:45:12completion. It is abbreviated as BAC.
- 6:45:16The budget at completion is the total
- 6:45:18approved project budget. If you look at
- 6:45:21this example, we have for our sample
- 6:45:25project a budget at completion of
- 6:45:28$100,000.
- 6:45:29This is how much money you as the
- 6:45:32project team have been provided to
- 6:45:34execute this particular project.
- 6:45:37Planned value is abbreviated as PV. The
- 6:45:42definition of planned value is the
- 6:45:44dollar value of deliverables you had
- 6:45:46planned to have complete at this time in
- 6:45:49the project. So looking at our sample
- 6:45:53project, we have a planned value or PV
- 6:45:56of $50,000.
- 6:45:58We had planned to have $50,000 worth of
- 6:46:02deliverables complete at this particular
- 6:46:04time. EV is defined as earned value.
- 6:46:10This is the dollar value of deliverables
- 6:46:12you have completed at this time in the
- 6:46:15project. So if you look at our sample
- 6:46:18project, we have an earned value of
- 6:46:20$55,000.
- 6:46:21That means that we have successfully
- 6:46:24completed $55,000
- 6:46:26worth of deliverables.
- 6:46:29Last is AC or actual cost. definition,
- 6:46:34the actual costs incurred to support the
- 6:46:36project to date. So in this particular
- 6:46:39case, in our sample project, we have
- 6:46:42$60,000.
- 6:46:44So now let's do a quick evaluation of
- 6:46:47BAC, PV, EV, and AC for this sample
- 6:46:51project. We initially have a budget of
- 6:46:55$100,000.
- 6:46:57At this particular point, we should have
- 6:46:59$50,000 worth of our deliverables
- 6:47:02produced. We actually have $55,000
- 6:47:06worth of the deliverables produced.
- 6:47:09However, we have spent $60,000 of our
- 6:47:12$100,000 budget to date. So, what can we
- 6:47:17do with this BAC, PV, EV, and AC
- 6:47:21information? We can next apply some EVM
- 6:47:26calculations.
- 6:47:28This concludes part one of our demo
- 6:47:30video. We look forward to seeing you
- 6:47:33again in part two.
- 6:47:37[Music]
- 6:47:46Welcome back. We hope you enjoyed part
- 6:47:48one of our demo. Welcome to part two.
- 6:47:52The first calculation we're going to
- 6:47:54take a look at is cost variance. The
- 6:47:57acronym for cost variance is CV. We have
- 6:48:00a formula. It is earned value versus
- 6:48:03actual cost. So looking at our scenario,
- 6:48:07our earned value is 55,000.
- 6:48:10Our actual costs are 60,000. When we
- 6:48:13subtract 60,000 from 55,000, we end up
- 6:48:17with a -5,000.
- 6:48:20So, what is our interpretation of
- 6:48:23$5,000?
- 6:48:24It tells us that this is negative. We
- 6:48:27are behind on budget by $5,000.
- 6:48:31We have $55,000
- 6:48:35worth of product. However, we
- 6:48:38spent60,000 to get that $55,000. We are
- 6:48:42$5,000 behind. This project is behind on
- 6:48:46budget.
- 6:48:48The next calculation is schedule
- 6:48:51variance. The acronym is SV. The formula
- 6:48:55for SV is earned value EV minus planned
- 6:48:59value PV. So let's apply the numbers.
- 6:49:03Our earned value once again is 55,000.
- 6:49:07Our planned value is 50,000.
- 6:49:10Subtracting 50,000 from 55,000, we now
- 6:49:13have a positive number of 5,000. Well,
- 6:49:16what does this mean? This is a positive
- 6:49:19number and we are ahead of schedule. So,
- 6:49:23let's go ahead and take a look at this a
- 6:49:25little bit more in detail. Earned value.
- 6:49:28We have $55,000
- 6:49:31worth of product and we had only planned
- 6:49:33to have $50,000 our PV of product at
- 6:49:37this time. We're $5,000 in terms of
- 6:49:40product production ahead. We are ahead
- 6:49:43of schedule. So going back to our
- 6:49:46calculations, you'll notice the acronyms
- 6:49:48CV and then SV. Whenever you have a C,
- 6:49:53that is an indicator for a budget
- 6:49:57status. Whenever you have S, it is an
- 6:50:00indicator for a schedule status. Now
- 6:50:03let's take a look at our third
- 6:50:05calculation, cost performance index.
- 6:50:08That is abbreviated as CPI.
- 6:50:11Our formula is earned value. this time
- 6:50:14divided by actual cost. So our earned
- 6:50:18value is 55,000. We divide this by
- 6:50:2260,000 and round to the nearest hundreds
- 6:50:26when performing earned value management
- 6:50:29calculations.
- 6:50:30The answer is 0.92.
- 6:50:35What does this mean? Well, this means
- 6:50:38that in this particular case, we have an
- 6:50:41earned value of 55,000, but we
- 6:50:44spent60,000 to go ahead and achieve that
- 6:50:4755,000 worth of value. In essence, we're
- 6:50:51getting 92 cents of value for every
- 6:50:54dollar that we are spending. When it
- 6:50:57comes to CPI, and remember the letter C
- 6:50:59tells us this is about budget. If the
- 6:51:02number is less than 1.0, zero. It means
- 6:51:05we are behind on budget. We're only
- 6:51:09getting value of 92 cents for every
- 6:51:12dollar that we spend. Not terrible, but
- 6:51:15not good. Let's move to our fourth
- 6:51:18calculation. SPI, schedule performance
- 6:51:21index. Again, letter S. This is going to
- 6:51:24give us status on our schedule. The
- 6:51:27formula is earned value EV divided by
- 6:51:30PV. So, we go back to our numbers. EV is
- 6:51:3455,000
- 6:51:35and PV is 50,000. Well, in this case, we
- 6:51:39end up with a number greater than 1,
- 6:51:421.1.
- 6:51:44What does this tell us? It means that we
- 6:51:46are ahead of schedule.
- 6:51:49When a number is greater than 1.0, this
- 6:51:52is good. We are ahead of schedule. If it
- 6:51:55is behind, we are behind schedule. So,
- 6:51:59let's take a look at this a little bit
- 6:52:01deeper. EV5,000.
- 6:52:04We have $55,000 worth of product and we
- 6:52:07only thought we were going to have
- 6:52:09$50,000 worth of product. We are moving
- 6:52:13at a 110%
- 6:52:16rate as compared to the 100% rate if PV
- 6:52:22equaled EV ahead of schedule. Now we go
- 6:52:26down to EAC which is estimate at
- 6:52:29completion. We have to refer back to our
- 6:52:32budget at completion 100,000 and we also
- 6:52:35have to refer back to a previous
- 6:52:38calculation the CPI. We calculated the
- 6:52:41CPI at.92.
- 6:52:43So by taking our 100,000 and dividing it
- 6:52:47by.92
- 6:52:48we end up with a number of 18,696.
- 6:52:54What does this mean? What it means is if
- 6:52:57we make no adjustments and the current
- 6:53:00trend continues through the end of the
- 6:53:03project, if the project cost and the
- 6:53:05current trend is unchanged, this project
- 6:53:09will cost us $18,696.
- 6:53:16That is for our variance at completion
- 6:53:21$8,696
- 6:53:24more than we had planned to spend. We
- 6:53:27are in the red. So unless we do
- 6:53:31something, we are going to spend $8,696
- 6:53:37more than the $100,000 we were allocated
- 6:53:40in our budget at completion. So, as a
- 6:53:45synopsis, as a summary, this project is
- 6:53:48over budget. However, it is ahead of
- 6:53:50schedule. That's the good news. The team
- 6:53:53must try to reduce costs through the
- 6:53:56remainder of this project so that you
- 6:53:58can get back on budget.
- 6:54:02This concludes our demonstration. Earned
- 6:54:05value management is a technique that is
- 6:54:07being used as a project status tool by
- 6:54:10many organizations. We hope you enjoyed
- 6:54:13this demo and we look forward to sharing
- 6:54:16key project management principles and
- 6:54:18tools and techniques with you. Again,
- 6:54:21have a great rest of your day.
- 6:54:25[Music]
- 6:54:34Welcome to expert viewpoints project
- 6:54:36support planning. In this video, we will
- 6:54:39hear from project managers on project
- 6:54:41planning.
- 6:54:43>> There's three things that immediately
- 6:54:45come to mind that can impact the
- 6:54:47effectiveness of project planning. First
- 6:54:50is racing through it and not spending
- 6:54:52enough time planning and researching and
- 6:54:54understanding what it is that you as the
- 6:54:57project manager need to do in order to
- 6:54:59make the project successful. If you
- 6:55:02don't dedicate enough time early on and
- 6:55:04you decide that you want to build the
- 6:55:06plane as you go, it's only going to lead
- 6:55:08towards much more risk and much more
- 6:55:11change management than what you want to
- 6:55:13manage. And the negative impact that
- 6:55:15that can have can be quite devastating
- 6:55:17on the project from a quality
- 6:55:20standpoint, from a timeline perspective,
- 6:55:22and from a budgetary perspective. You
- 6:55:25may think that you're saving time by
- 6:55:26erasing through project planning, but in
- 6:55:28the end it might end up taking you more
- 6:55:30time than ever.
- 6:55:32Second, the second thing that is key to
- 6:55:34project planning is having the right
- 6:55:36resources involved. Your project team
- 6:55:38when you're planning may be different
- 6:55:40than the project team when you're
- 6:55:41executing. There may be just a few folks
- 6:55:44who roll over into the escalation or
- 6:55:46there may just be a few people who roll
- 6:55:48over into the execution phase of your
- 6:55:51project. But ensuring that you've got
- 6:55:54the right resources in planning will
- 6:55:55help you with that transition and also
- 6:55:58make sure that the project is staffed
- 6:56:00correctly from the beginning.
- 6:56:02And then third is clear understanding of
- 6:56:04the scope. Part of project planning is
- 6:56:07doing the work breakdown schedule and
- 6:56:09setting up the timeline. And if you
- 6:56:12don't have a clear project scope, then
- 6:56:13neither of those activities will be
- 6:56:15successful and your project team will
- 6:56:17not have a clear vision of what it is
- 6:56:20that they need to get done. So the three
- 6:56:23most important things for project
- 6:56:24planning is one allow sufficient time
- 6:56:27and don't race through it. Two ensure
- 6:56:29that you have the proper resources that
- 6:56:31you need to both plan and execute the
- 6:56:34project and then three make sure that
- 6:56:36you have clear understanding of the
- 6:56:38goals and the scope of work that needs
- 6:56:40to be done.
- 6:56:42Impacts of effective project planning
- 6:56:44can include a change in the scope or
- 6:56:47stakeholders. the amount of time
- 6:56:49estimated becomes unfeasible and needs
- 6:56:52to make changes. A lack of team building
- 6:56:55and communication can really impact your
- 6:56:57overall project.
- 6:56:59>> Well, let me be honest with you. We
- 6:57:01could probably spend the next hour or
- 6:57:02two discussing this question because
- 6:57:04there are plenty of things that can
- 6:57:06impact the effectiveness of your
- 6:57:08planning. But let me begin with one of
- 6:57:10my favorite quotes from Benjamin
- 6:57:12Franklin. If you fail to plan, you are
- 6:57:14planning to fail. So here are my top
- 6:57:17four reasons or impacts if you will.
- 6:57:20Number one, failure to gain approval of
- 6:57:24a project charter. Even beyond that,
- 6:57:27failure to even develop a project
- 6:57:28charter in the first place. Remember
- 6:57:31that the project charter is the basis
- 6:57:33for all planning. It lists the project
- 6:57:35goals and highlevel objectives. Planning
- 6:57:38accomplished without the benefit of a
- 6:57:40project charter will likely lead to
- 6:57:43scope creep and project failure in the
- 6:57:46end. A little bit more on that point
- 6:57:49later. Secondly, another quote, know
- 6:57:52what you know, know what you don't know,
- 6:57:54and surround yourself with people who
- 6:57:55know what you don't know. Ensure you
- 6:57:58have the subject matter experts
- 6:57:59available to help you effectively plan.
- 6:58:02Otherwise, your plan will likely be
- 6:58:05flawed. failure to have the meeting
- 6:58:08before the meeting. Share your scope,
- 6:58:11schedule, and budget with key
- 6:58:12stakeholders as they are developed. Do
- 6:58:16not wait until everything is completed.
- 6:58:19Effective project planning addresses
- 6:58:21scope first. Once the scope baseline is
- 6:58:24approved, schedule and budget planning
- 6:58:27is completed and approved as well.
- 6:58:30Finally, support planning is completed.
- 6:58:32Be inclusive and get sign off each step
- 6:58:35along the way. Finally, assumptions.
- 6:58:40Definition. Assumptions are factors we
- 6:58:42believe to be true but have not
- 6:58:44validated. Remember this. Assumptions
- 6:58:47lead to risks. Risks lead to issues.
- 6:58:50Issues lead to problems and potential
- 6:58:53project failure. Don't assume. Validate
- 6:58:56your assumptions.
- 6:59:00[Music]
- 6:59:07Welcome to expert viewpoints project
- 6:59:10support planning tips. In this video, we
- 6:59:13will hear tips and advice from project
- 6:59:15managers on how to ensure successful
- 6:59:17project support planning and which
- 6:59:19aspect of planning is most critical for
- 6:59:21project success.
- 6:59:23First off, have a successful internal
- 6:59:26handover. get to know the actual
- 6:59:28project, the project charter that's
- 6:59:30presented, whether you are presenting it
- 6:59:33or someone else presented it to you. And
- 6:59:36then from there, a project kickoff
- 6:59:38that's well thought out, well planned,
- 6:59:39and worked with others. And then from
- 6:59:42there, do not skip planning at all. You
- 6:59:45have to have a great planning strategy
- 6:59:47in order to move forward. If you rush
- 6:59:50into something, it will not be done the
- 6:59:52right way. It's just like a train that
- 6:59:54has half of a rail. it's not going
- 6:59:56anywhere.
- 6:59:58>> Find a good template for project
- 7:00:00planning that you like to use. Make
- 7:00:02changes where you need to and get
- 7:00:04feedback on it from your project
- 7:00:06managing coach or mentor. Reuse it for
- 7:00:10projects that are similar and tweak it
- 7:00:12as you go.
- 7:00:14Ask yourself what if questions. What if
- 7:00:17we shorten one phase in order to
- 7:00:19lengthen another phase? What if we add a
- 7:00:22resource so we can shorten the phase? or
- 7:00:24what if we take away a resource? These
- 7:00:27types of whatif scenarios, if you just
- 7:00:29jot them down, can help you identify
- 7:00:32areas where there may be risk, and it
- 7:00:34may also help you identify areas where
- 7:00:36change management come into play. So,
- 7:00:39play around with your whatif scenarios.
- 7:00:41They're often also good conversation
- 7:00:43starters with your mentors or with other
- 7:00:46team project team members that you find
- 7:00:48inspirational.
- 7:00:50Document your communication plan and
- 7:00:53your escalation plan. It's never too
- 7:00:55early to start on a communication plan.
- 7:00:58And you should always have an escalation
- 7:01:00plan as part of your overall project
- 7:01:02plan. Even if you hope that you don't
- 7:01:05need to use your escalation plan, have
- 7:01:07it in place so that you're not
- 7:01:09floundering around when an escalation
- 7:01:11does happen.
- 7:01:14Work on your work back schedule and your
- 7:01:16work breakdown schedule. Understand the
- 7:01:19scope of the work that needs to be done
- 7:01:20and work with your team members so that
- 7:01:22they understand it too. Start that early
- 7:01:25on and in the project planning and when
- 7:01:27you get to execution it'll runs more
- 7:01:30smooth.
- 7:01:32Well, first and foremost communicate
- 7:01:34effectively. Communications is the glue
- 7:01:36that holds the project together. Ensure
- 7:01:39all key stakeholders are aware of the
- 7:01:42current status and are proactively aware
- 7:01:45and working any issues. Next,
- 7:01:49understand the project and the skill
- 7:01:51sets and personnel essential to success.
- 7:01:54List these required personnel resources
- 7:01:57in the project charter and gain approval
- 7:02:00to include these essential subject
- 7:02:02matter experts in planning. A point
- 7:02:05worth repeating, the objectives in the
- 7:02:07project charter are the guidelines to
- 7:02:10effectively plan the project. If a
- 7:02:13requirement is in the project charter,
- 7:02:16plan for its accomplishment. If the
- 7:02:18requirement is not in the project
- 7:02:20charter, as we mentioned earlier,
- 7:02:23planning this requirement will result in
- 7:02:25scope creep.
- 7:02:27All aspects of support planning are
- 7:02:29incredibly critical. The one that I
- 7:02:32think always bubbles up to the top is
- 7:02:34communication. Without clear
- 7:02:36communication that's consistent, that's
- 7:02:38accurate and that's proactive,
- 7:02:41everything else in part as part of the
- 7:02:42project is going to fall apart. You
- 7:02:44won't be able to manage your
- 7:02:46stakeholders well. Your leadership of
- 7:02:48the project is going to run into bumps
- 7:02:51and as a whole, the project team just is
- 7:02:53not going to work well together. So the
- 7:02:55most important part to support planning
- 7:02:58is having a very clear communication
- 7:03:00plan. One that you can tailor towards
- 7:03:03the communication desires of your team.
- 7:03:05Whether it's your internal team, your
- 7:03:07management team, your leadership team,
- 7:03:10or your client team. It's incredibly
- 7:03:12important to build the rapport with the
- 7:03:14client through communication in a way
- 7:03:16that they want. Do they want emails? Do
- 7:03:19they want chat messages? Are they
- 7:03:21willing to use their cell phone and text
- 7:03:23messages? Having a happy client getting
- 7:03:26the information they need and having it
- 7:03:28at their fingertips will make the
- 7:03:29project go a lot better.
- 7:03:32>> To be successful in support planning,
- 7:03:35you have to really understand the full
- 7:03:37scope of the project in order to move
- 7:03:40forward. From there, you need to
- 7:03:42identify if you need additional
- 7:03:44training, whether it's for individuals
- 7:03:47or those that are going to be joining
- 7:03:49later on, whether it's external to your
- 7:03:51customer or just internal for the
- 7:03:53support team.
- 7:03:56This is a trick question. The answer is
- 7:03:58all aspects of support planning are
- 7:04:00critical. Let's begin by reviewing a
- 7:04:03brief list of some of the support
- 7:04:05planning that is required to support a
- 7:04:07project. after keyword after scope,
- 7:04:10schedule and budget have been approved
- 7:04:13and signed off. Number one, quality.
- 7:04:16Quality assurance and quality control
- 7:04:18are essential to ensure the project
- 7:04:20conforms to requirements and provides a
- 7:04:23fitforuse product or service. A project
- 7:04:27with no quality assurance or quality
- 7:04:30control is probably a project that is
- 7:04:33destined to fail. Secondly,
- 7:04:35communications planning is essential to
- 7:04:39ensure the right information gets to the
- 7:04:42right people at the right time and in
- 7:04:44the right amount.
- 7:04:47Please consider developing a
- 7:04:49communications management plan and
- 7:04:51following it. Third, you can manage risk
- 7:04:55or risk will manage you. Ensure all
- 7:04:58risks are identified and responses are
- 7:05:01developed. include all stakeholders in
- 7:05:04effective project risk management. Next,
- 7:05:08resources include personnel, equipment,
- 7:05:11supplies, and materials. Ensure you
- 7:05:14identify the resources you require, when
- 7:05:16they are required, and gain approval
- 7:05:19from functional managers who control
- 7:05:21these resources.
- 7:05:23key role and responsibility in a
- 7:05:25project. A functional manager, the
- 7:05:27individual or group that controls or
- 7:05:29manages the resources that you need.
- 7:05:32Finally, plan for any third-party
- 7:05:34support that is needed. Develop a
- 7:05:37procurement management plan. There are
- 7:05:39some times when you are required to
- 7:05:42outsource certain
- 7:05:45supplies, certain materials, certain
- 7:05:48services that cannot be provided
- 7:05:49internally. And as the project manager,
- 7:05:52you need to manage and control this
- 7:05:54process. This concludes this set of
- 7:05:57questions on project planning. Thank you
- 7:05:59very much and I hope to see you again in
- 7:06:01futureme interviews. Have a great rest
- 7:06:04of your day.
- 7:06:07[Music]
- 7:06:16[Music]
- 7:06:19Hello everyone and welcome to a quick
- 7:06:21demonstration on a project charter. This
- 7:06:24is part of your final lab assignment.
- 7:06:27The project charter is the first
- 7:06:28document created in the initiation
- 7:06:30phase. It answers what, why, and who
- 7:06:33questions about the project. The project
- 7:06:36charter must be approved by the project
- 7:06:37sponsor before formal planning can
- 7:06:40begin. This brief demo shares the blank
- 7:06:42template you will use for the lab for
- 7:06:44the scenario provided. In addition, we
- 7:06:47share an example of a project charter
- 7:06:49used in a previous lesson for this
- 7:06:51course. Part one is general information
- 7:06:54about the project charter and you can
- 7:06:56see that we have a blank template for
- 7:06:58you to fill in the blanks. Part two is
- 7:07:02additional project charter clarifying
- 7:07:04information and again we provide a blank
- 7:07:06template for you.
- 7:07:09Let's go ahead and review briefly what
- 7:07:12goes into a project charter. And
- 7:07:14hopefully this brief demo and
- 7:07:16information will help you during this
- 7:07:17lab. First of all, every project should
- 7:07:20have a distinct project name. It does
- 7:07:23not have to be long. It does not have to
- 7:07:25be in-depth. For example, this project
- 7:07:27is the ABC annual new investor dinner
- 7:07:30project.
- 7:07:32Every project charter should have a very
- 7:07:34brief goal, action, and result. the
- 7:07:37action. Conduct a dinner for 40
- 7:07:38potential investors. The result, the
- 7:07:41goal is to win business for the firm.
- 7:07:44Always include the project value
- 7:07:46proposition and benefits. Why are we
- 7:07:49doing this particular project? Four
- 7:07:52areas that are normally included when
- 7:07:55taking a look and evaluating the value
- 7:07:57proposition for a project are finance.
- 7:08:00Is this project going to be beneficial
- 7:08:03from a financial standpoint for the
- 7:08:05company process? Is this project going
- 7:08:08to help us to become more efficient
- 7:08:11employee? Is this project going to
- 7:08:13benefit our potential for employee
- 7:08:15performance and customer? Are our
- 7:08:18customers going to be delighted? And are
- 7:08:20we responding perhaps to something that
- 7:08:22the customer suggested we do to improve
- 7:08:25our products or services? A value
- 7:08:28proposition does not have to include all
- 7:08:30four of these aspects, finance, process,
- 7:08:33employee, and customer, but as many as
- 7:08:35you can find, the greater the impact
- 7:08:38will be of the project charter. The next
- 7:08:41area is the problem or opportunity
- 7:08:43statement. Many projects are wonderful
- 7:08:46ideas, but why does this project need to
- 7:08:48be accomplished? Now, the next area is
- 7:08:51the project charter. Keep it very
- 7:08:54simple. When are we going to begin our
- 7:08:56planning? When is the event date? Not a
- 7:08:59whole lot of detail required here. Start
- 7:09:01date and an end date often times
- 7:09:03suffices. Every project should have a
- 7:09:06single unique project manager assigned
- 7:09:09and every project should have a sponsor.
- 7:09:13Part one of this project charter is
- 7:09:15general information. It can be provided
- 7:09:17to key stakeholders for review. And if
- 7:09:20you get signed off on part one, then go
- 7:09:23to part two of the project charter. In
- 7:09:25part two of the project charter, we have
- 7:09:27two areas, assumptions and constraints.
- 7:09:30Assumptions are things that we believe
- 7:09:32to be true but have not validated. And
- 7:09:34constraints are those issues, those
- 7:09:38problems, those considerations that can
- 7:09:41impact the project that we need to go
- 7:09:43ahead and plan around. Always include a
- 7:09:47proposed solution. And again, much like
- 7:09:49the schedule prior, keep it simple. Step
- 7:09:53one, step two, step three. One of the
- 7:09:55things that you learned in this
- 7:09:57particular course is the PDCA
- 7:09:59methodology. Plan, do, check, act.
- 7:10:02Oftentimes, a proposed solution can
- 7:10:04follow that methodology quite easily.
- 7:10:06Plan the event, execute the event, and
- 7:10:08perform follow-up actions.
- 7:10:11Project priorities. The project
- 7:10:13manager's priorities are time, cost, and
- 7:10:16scope. The ultimate goal is to achieve
- 7:10:18all three as planned. However, we need
- 7:10:21to understand which of the three
- 7:10:24schedule, budget or scope takes priority
- 7:10:27for this particular project. Schedule is
- 7:10:29priority one. This particular event is
- 7:10:32occurring on the 30th of June. We cannot
- 7:10:34deviate from that. Priority number two
- 7:10:37is the budget. $14,000 is the goal. We
- 7:10:41want to meet that particular budget.
- 7:10:43However, if it comes down to a decision
- 7:10:45between budget and schedule, then we'll
- 7:10:48go ahead and sacrifice the budget so
- 7:10:50that we do not have to sacrifice the
- 7:10:52schedule.
- 7:10:54Scope is semiflexible. We want to create
- 7:10:56the best environment for customers
- 7:10:58possible. However, not at the expense of
- 7:11:01meeting the budget and meeting the
- 7:11:03schedule. Return on investment can be
- 7:11:06numerical or it can just be a quick
- 7:11:09overview of what we call the soft
- 7:11:10benefits. In this particular case, we
- 7:11:13have a well- definfined cost and a
- 7:11:15revenue stream potentially to be
- 7:11:17achieved if we are able to capture 22
- 7:11:20new clients. However, there may be times
- 7:11:22when you do not have those numericics
- 7:11:24available. If that's the case, simply
- 7:11:26put down the soft benefits such as
- 7:11:28goodwill, word of mouth advertising,
- 7:11:31grow the client base, etc.
- 7:11:34Always define the initial risks. Try to
- 7:11:37show the risk and the impact. Our first
- 7:11:40example, the risk is attendees do not
- 7:11:42show. Well, what is the impact? Reduced
- 7:11:45revenue opportunities. And in addition,
- 7:11:48provide a brief overview of the
- 7:11:49resources that are required. Certainly,
- 7:11:52a project manager is a great asset to
- 7:11:55have on a project, but that project
- 7:11:57manager is singular, one person. It is
- 7:12:01uncommon for a project to only require
- 7:12:04one individual to go ahead and plan and
- 7:12:06implement. Who are the stakeholders that
- 7:12:09are interested impacted by the project?
- 7:12:12Who are the stakeholders that you
- 7:12:13require to be committed to provide
- 7:12:15support to this particular project so
- 7:12:17that the project can be successful? Good
- 7:12:20luck reviewing the scenario in the lab
- 7:12:23and good luck filling out your project
- 7:12:25charter and I look forward to seeing you
- 7:12:28for future demos. Have a great day.
- 7:12:35[Music]
- 7:12:43Hello everyone and welcome to a brief
- 7:12:45demonstration on a tool and technique in
- 7:12:48project management called a stakeholder
- 7:12:50register. The purpose of a stakeholder
- 7:12:53register is to list all key stakeholders
- 7:12:57and define their particular roles and
- 7:13:00responsibilities that are required for
- 7:13:02the project to be successful. You will
- 7:13:04be asked to complete a stakeholder
- 7:13:06register as part of your final lab
- 7:13:09assignment. Here is a blank template
- 7:13:11that you will be able to use for the lab
- 7:13:14assignment. Let's take a look at an
- 7:13:16example and hopefully prepare you to be
- 7:13:19successful in the lab. First and
- 7:13:22foremost, try to define the project that
- 7:13:24the stakeholder register supports.
- 7:13:27There are probably numerous projects in
- 7:13:29an organization. So you want to identify
- 7:13:32the specific project that this
- 7:13:34particular document is supporting. In
- 7:13:37the first column we have the name or the
- 7:13:39position. When you know the name of the
- 7:13:41individual that is optimal. However,
- 7:13:43there may be times when you do not have
- 7:13:45a name assigned as of yet and you only
- 7:13:47know that there is a position that is
- 7:13:49required.
- 7:13:51Organization is the second column. In a
- 7:13:54large company, this can be a value added
- 7:13:56entry. In a smaller company, it may not
- 7:13:59be a required entry at all. The third
- 7:14:02column is the role. This is very very
- 7:14:04important. A role may be a title such as
- 7:14:08project manager and sponsor or a role
- 7:14:11may be an action such as develop
- 7:14:13financial training materials and review
- 7:14:16materials.
- 7:14:17Roles and responsibilities are defined
- 7:14:20in terms of RACI or REACY terminology.
- 7:14:25You noticed on this example that many of
- 7:14:28these stakeholders have multiple entries
- 7:14:31under the R, the A, the C, and the I.
- 7:14:34Let's briefly describe what each of
- 7:14:36these letters means. If someone is coded
- 7:14:39in R, it means they're responsible for
- 7:14:41performing work or tasks. They actually
- 7:14:44have things that they need to do in
- 7:14:45support of the project. If someone is
- 7:14:48coded as an A, they may not necessarily
- 7:14:51be responsible for doing the work.
- 7:14:53However, they are accountable for the
- 7:14:55outcomes. Someone who is coded as a C is
- 7:14:59a subject matter expert and someone who
- 7:15:02is coded as an I is someone that we want
- 7:15:05to continually inform as the project
- 7:15:07progresses. There is a column in the
- 7:15:10stakeholder register for comments. There
- 7:15:12may be times when comments are not
- 7:15:14applicable. In other cases, you may want
- 7:15:16to go ahead and add some clarification
- 7:15:18to the role and responsibilities.
- 7:15:21Before you publish the stakeholder
- 7:15:23register, ensure that you use version
- 7:15:25control, date it, and number the
- 7:15:28version. This stakeholder register will
- 7:15:32change as the project progresses and it
- 7:15:34will require updates. Good luck in your
- 7:15:37lab and we hope that you are ready to go
- 7:15:40ahead and prepare an excellent
- 7:15:42stakeholder register that you can share
- 7:15:44with your peers. Have a great day and
- 7:15:47we'll talk to you soon.
- 7:15:51[Music]
- 7:16:00Hello everyone. I'd like to go ahead and
- 7:16:01take a moment and provide a brief
- 7:16:04demonstration of a tool and technique
- 7:16:06used in project management called a work
- 7:16:09breakdown structure. A work breakdown
- 7:16:12structure is a hierarchial breakout or
- 7:16:15decomposition of all project work. A
- 7:16:19work breakdown structure has three
- 7:16:20levels. Level one is the project level.
- 7:16:25Level two are the phase levels and level
- 7:16:29three is where the work is accomplished
- 7:16:32referred to as the work package level.
- 7:16:35The work breakdown structure is a
- 7:16:37critical tool that is used to define
- 7:16:40scope schedule and also perform budget
- 7:16:43planning. Each box within the work
- 7:16:47breakdown structure has a unique number.
- 7:16:51This is called a code of account
- 7:16:53identifier.
- 7:16:55Let's go ahead and take a look at an
- 7:16:57example of a work breakdown structure
- 7:16:59for an all hands project. Level one is
- 7:17:03the project level. We annotate it with
- 7:17:06the code of account identifier 1.0. The
- 7:17:09all hands project. Level two is the
- 7:17:12phase level. For this all hands project,
- 7:17:15we are breaking out the project into
- 7:17:17three phases. 1.1 is planning the
- 7:17:20project. 2.1 is executing the project.
- 7:17:243.1 is closing the project. Note how we
- 7:17:28are annotating each activity with action
- 7:17:32and result. Plan the project, execute
- 7:17:36the project, close the project. Within
- 7:17:39level three, we break out each work
- 7:17:43package that needs to be accomplished to
- 7:17:46successfully achieve the phase. Within
- 7:17:49project planning, we need to manage the
- 7:17:52venue, develop a transportation plan,
- 7:17:55develop a catering plan, manage
- 7:17:58speakers, develop an audiovisisual plan,
- 7:18:01and develop and approve the agenda and
- 7:18:03the plan. Notice again we are using
- 7:18:06action and result. Try to go ahead and
- 7:18:10keep these work packages at a relatively
- 7:18:13high level. And in addition, try to go
- 7:18:16ahead and sequence them in the order in
- 7:18:18which they're going to occur. Once you
- 7:18:21are complete with the first phase, go to
- 7:18:23the second phase. Our second phase is to
- 7:18:26execute the project. We're going to
- 7:18:28prepare the venue, implement the first
- 7:18:31part of our transportation plan,
- 7:18:33implement the catering plan, welcome
- 7:18:36speakers, verify audiovisisual, and
- 7:18:39implement the event. Notice how within a
- 7:18:42work breakdown structure where we have a
- 7:18:44planning activity for example develop
- 7:18:47the audiovisisual plan we oftent times
- 7:18:49have an implementation activity as well
- 7:18:53verify the audio visual another example
- 7:18:56in planning we're going to develop the
- 7:18:59transportation plan in executing we're
- 7:19:02going to go ahead and implement the
- 7:19:04transportation plan
- 7:19:06the third phase is to close the project
- 7:19:09we're going to close the meeting, close
- 7:19:12out the venue, implement the
- 7:19:13transportation plan part two, solicit
- 7:19:16feedback, and conduct lessons learned.
- 7:19:20You are going to have an opportunity to
- 7:19:22develop a work breakdown structure as
- 7:19:24part of your course lab. A blank
- 7:19:28template is provided for this lab. If
- 7:19:31you look at the first tab, we have a
- 7:19:33blank template that is ready for you to
- 7:19:36go ahead and complete.
- 7:19:38Do the best that you can on the lab. Try
- 7:19:42to complete a work breakdown structure
- 7:19:44and share it with your peers. And I look
- 7:19:47forward to seeing you in future
- 7:19:49demonstrations.
- 7:19:51Have a great rest of your day.
- 7:19:55[Music]
- 7:20:04Hello everyone and welcome to a brief
- 7:20:06demo video on project network diagrams.
- 7:20:10You will have an opportunity to develop
- 7:20:12a network diagram in your final lab for
- 7:20:14this course.
- 7:20:16A network diagram is simply a graphical
- 7:20:19representation of a project's activities
- 7:20:22or work packages in the order in which
- 7:20:25they occur. Durations are then added to
- 7:20:28each activity to determine the critical
- 7:20:30path. So in other words, determine how
- 7:20:33long the project will take to complete.
- 7:20:36There are many tools you can use to
- 7:20:38build a network diagram. We will use a
- 7:20:41simple tool that you're looking at right
- 7:20:43now in Microsoft Excel. So let's begin.
- 7:20:47The most important step in creating a
- 7:20:49network diagram happens during scope
- 7:20:52planning. A network diagram uses
- 7:20:55activities identified in the work
- 7:20:57breakdown structure. Remember a work
- 7:21:00breakdown structure has three levels.
- 7:21:04There is the project at level one, the
- 7:21:07phases at level two, and the activities
- 7:21:10at level three.
- 7:21:12For a project network diagram, only map
- 7:21:15out the level three activities.
- 7:21:18So with that, let's review a simple
- 7:21:20meeting management network diagram and
- 7:21:22share the highlights.
- 7:21:25Step number one is to place all
- 7:21:27activities in the order in which they
- 7:21:29will occur.
- 7:21:31Always begin with a project start. This
- 7:21:35is usually shown by an oval mapping
- 7:21:37shape. Dependencies will play a factor
- 7:21:40in your execution order. In this
- 7:21:43example, we begin with activity number
- 7:21:46one. define outcomes. We then reviewed
- 7:21:50activities two and three. The team
- 7:21:53determined that these activities could
- 7:21:56occur simultaneously.
- 7:21:58Activity 2 and three are not dependent
- 7:22:01upon one another. Two and three can
- 7:22:04happen independently of one another.
- 7:22:07They also determine that activities two
- 7:22:10and three cannot occur until activity
- 7:22:13one is complete. Therefore, activities
- 7:22:16two and three are dependent upon
- 7:22:20activity number one.
- 7:22:22Continue mapping all activities all the
- 7:22:26way until the end. There may be times
- 7:22:28when you need to add a buffer. We have
- 7:22:32an example between activities four and
- 7:22:35activities five of a buffer. A buffer is
- 7:22:40nonworking waiting time. In this
- 7:22:43example, the agenda is forwarded in
- 7:22:46activity 4. It is sent out two days
- 7:22:49prior to the meeting in activity five. A
- 7:22:53buffer is depicted by a circle. In step
- 7:22:57two, we calculate the critical path.
- 7:23:01When activities are being accomplished
- 7:23:04concurrently as in 2 and 3 and six and
- 7:23:087, we select the activity that has the
- 7:23:12longest duration. Let's take activities
- 7:23:156 and 7 as our example. They can be
- 7:23:18accomplished concurrently.
- 7:23:21Activity 6 takes 1 day. Activity 7 takes
- 7:23:276 days. Activity 7 is the longest. it
- 7:23:31becomes part of the critical path.
- 7:23:34Activity six can be accomplished at some
- 7:23:37time within the six-day duration of
- 7:23:39activity 7. It is not on the critical
- 7:23:43path.
- 7:23:45A best practice in project management is
- 7:23:47to color code the critical path in red.
- 7:23:50As you can see on this example, we have
- 7:23:53those particular activities colorcoded
- 7:23:56in red. code activities not on the
- 7:23:59critical path in blue. You'll notice
- 7:24:02that we have two such activities. You
- 7:24:05are not mandated to use these color
- 7:24:07codes.
- 7:24:09We can now calculate the critical path.
- 7:24:12So let's take a look at the critical
- 7:24:15path. 1 + 2 + 1 + 2 + 1 + 6 equals a
- 7:24:23total of 13 days. This is the critical
- 7:24:27path or in other words, how long will
- 7:24:30this project take? This project will
- 7:24:32take 13 days.
- 7:24:35Step three recommends you use separate
- 7:24:37tabs for each phase or activity stream
- 7:24:40in your work breakdown structure. This
- 7:24:43will make your network diagram simpler,
- 7:24:46easier to analyze and update, and less
- 7:24:49complicated for those viewing the
- 7:24:51diagram.
- 7:24:52Step four is your validation. If there
- 7:24:56were 12 activities in your work
- 7:24:58breakdown structure, your network
- 7:25:01diagram should have 12 total activities.
- 7:25:05Now, this particular spreadsheet, as you
- 7:25:07can see, has two tabs. Tab two is the
- 7:25:10meeting example we have just shared. Tab
- 7:25:13one is a blank tab. Use the blank tab
- 7:25:18for your lab assignment. You will notice
- 7:25:21that there are ample activity buffer,
- 7:25:24start, end, and arrow symbols on the
- 7:25:27bottom of this particular blank
- 7:25:30template. And using these is simply as
- 7:25:34taking them and moving them up.
- 7:25:38Have fun with this.
- 7:25:41Now, I recommended that you do different
- 7:25:44phases on each particular tab. How would
- 7:25:48you go ahead and do this? To make a new
- 7:25:51tab, simply rightclick on the blank tab,
- 7:25:56select move or copy.
- 7:26:00Move to the end and create a copy.
- 7:26:08And there you see it. We now have a
- 7:26:10second tab for you to go ahead and
- 7:26:13continue your network diagram in phase
- 7:26:17number two. Continue with us for sub
- 7:26:19subsequent phases of your work breakdown
- 7:26:22structure
- 7:26:24to complete your network diagram.
- 7:26:26So with that, enjoy the activity. Good
- 7:26:29luck on your lab assignment and we look
- 7:26:32forward to seeing you again in future
- 7:26:34demos. Have a great rest of your day.
- 7:26:40[Music]
- 7:26:48Welcome to a short project budgeting
- 7:26:50demo. In this demo, we will illustrate
- 7:26:53tools used in building and presenting a
- 7:26:55project budget and share a common
- 7:26:58estimation methodology called
- 7:27:00threepoint.
- 7:27:01Let's begin with a two-step approach to
- 7:27:03build a project budget.
- 7:27:06Step number one is to begin with a
- 7:27:08review of the total costs for the
- 7:27:10project. A simple Excel spreadsheet will
- 7:27:13often suffice. Break out the costs by
- 7:27:16direct, indirect, and reserve
- 7:27:18requirements.
- 7:27:20A general rule is that contingency
- 7:27:22reserves are usually 10% times direct
- 7:27:25costs. Management reserves are for
- 7:27:28unknown risks. If you suspect there are
- 7:27:31many unknown risks, add additional
- 7:27:33contingency under the management
- 7:27:35reserves. Let's look at a simple
- 7:27:38example.
- 7:27:40This is a project for the annual
- 7:27:43executive meeting support project. We
- 7:27:47begin by defining our costs. In this
- 7:27:50particular case, you'll notice we have
- 7:27:52them categorized by venue, setup and
- 7:27:55venue, cleanup, audiovisisual, etc.
- 7:27:59Next, we tried to determine if they are
- 7:28:01direct or indirect costs. As you notice
- 7:28:05in the notes, a direct cost is a cost
- 7:28:07that is charged to the project. So,
- 7:28:10let's find our first example. You'll
- 7:28:13notice that under direct cost, setup and
- 7:28:16venue cleanup, contractor supported,
- 7:28:19this is a direct costs. This means that
- 7:28:21the project manager needs to acquire
- 7:28:24$2,000 and the project will be required
- 7:28:27to go ahead and disperse those funds to
- 7:28:30the contractor. But we have another type
- 7:28:32of costs as well. These are indirect
- 7:28:35costs. Looking at our notes, indirect
- 7:28:38costs, these are paid for by an external
- 7:28:41source. If these costs were not paid by
- 7:28:44an external source, the project would
- 7:28:46need to plan and account for them. So
- 7:28:49let's look at our example. The first
- 7:28:51indirect cost we come to is $3,000.
- 7:28:54What is this for? Going across to the
- 7:28:57cost description. This is for the venue.
- 7:28:59But you'll notice we have a note. This
- 7:29:01is going to be paid for by the
- 7:29:02organization. So while the project is
- 7:29:05not paying for the venue, this is a cost
- 7:29:09to the project. It's just being paid for
- 7:29:12by another third party.
- 7:29:15In calculating the total costs of a
- 7:29:18project, we add up all of the direct
- 7:29:20costs, in this particular case, $6,000,
- 7:29:24and all of the indirect costs, in this
- 7:29:26case, $5,000. Our total project costs
- 7:29:29are $11,000.
- 7:29:32One last piece of information, we need
- 7:29:36to go ahead and calculate contingency
- 7:29:38reserves. Contingency reserves are those
- 7:29:41extra dollars that are set aside in case
- 7:29:44risks occur. Normally, contingency
- 7:29:47reserves are 10% times the direct costs.
- 7:29:51So, if you look at this illustration, we
- 7:29:53have $600. We take 10%, we multiply it
- 7:29:58by 6,000, and we end up with $600. This
- 7:30:02is dollars that we do not have access to
- 7:30:06unless we request them. However, they
- 7:30:08are available in case a risk occurs.
- 7:30:12Now, let's take a look at step two.
- 7:30:15Here, we determine when the funds are
- 7:30:17needed. You need to phase your project
- 7:30:20funding requirements for a real world
- 7:30:23project. Allocating costs to each work
- 7:30:26package or activity in the work
- 7:30:28breakdown structure and using your
- 7:30:31network diagram to determine when costs
- 7:30:33will be incurred is a best practice.
- 7:30:36Here's how that calculation could work.
- 7:30:40But remember, only request direct costs.
- 7:30:43Ensure what you are asking for matches
- 7:30:46your direct cost requirements in step
- 7:30:49one. And as a refresher, that was
- 7:30:52$6,000.
- 7:30:55So on this particular
- 7:30:58sheet, we take a look at our direct cost
- 7:31:00requirements.
- 7:31:02And now we break them out into phases.
- 7:31:05Phase one is planning. Phase two is the
- 7:31:08day of the meeting. And phase three is
- 7:31:11the post meeting. These dates are
- 7:31:14February 15th for planning, February
- 7:31:1820th for the day of the meeting and the
- 7:31:21post meeting on February 24th.
- 7:31:25Now, we share the direct costs and we
- 7:31:28annotate them when these dollars will be
- 7:31:32required. So, we're going to require
- 7:31:35$2,500
- 7:31:36on February 15th to support planning.
- 7:31:39This will pay for setting up the venue
- 7:31:42and general supplies. On the day of the
- 7:31:45meeting, we need $2,500
- 7:31:48in our account. We're going to pay
- 7:31:50$1,000
- 7:31:52to clean up the venue, 500 for
- 7:31:55beverages, $1,000 for catering. And on
- 7:31:59February 24th, we will pay the final
- 7:32:02payment for the catering, $1,000.
- 7:32:06Notice 2500
- 7:32:092500 $1,000 equals $6,000.
- 7:32:13This was our direct cost requirements.
- 7:32:18This concludes part one of our demo
- 7:32:20video. We look forward to seeing you
- 7:32:23again in part two.
- 7:32:27[Music]
- 7:32:36Welcome back. We hope you enjoyed part
- 7:32:38one of our demo. Welcome to part two.
- 7:32:43Now, you may choose
- 7:32:46to use a tool called a resource
- 7:32:48breakdown structure. This is also
- 7:32:51generally an Excel spreadsheet and it
- 7:32:55can help accomplish both steps one and
- 7:32:57two on a single spreadsheet. Let's use
- 7:33:01the executive meeting project to show
- 7:33:03how this could work. Costs are captured
- 7:33:06under categories and work breakdown
- 7:33:09structure activity numbers. Match the
- 7:33:12activity numbers to your schedule
- 7:33:14network diagram to determine when funds
- 7:33:16are required. Again, only document
- 7:33:20direct funds. So, let's take a look at
- 7:33:24this particular spreadsheet. The
- 7:33:26resource breakdown structure for the
- 7:33:28annual executive meeting support
- 7:33:30project.
- 7:33:32Each work breakdown structure activity
- 7:33:35has its individual number.
- 7:33:38The work package explains what is
- 7:33:41happening in each work breakdown
- 7:33:43structure activity. For example,
- 7:33:45activity 111 is to define the venue. 112
- 7:33:50is to determine attendees.
- 7:33:53Now, what we need to do is we need to
- 7:33:56determine during which of these
- 7:33:58activities will our total of $6,000 be
- 7:34:02required. So, if you take a look, we
- 7:34:06have a $1,000 requirement for venue
- 7:34:09support. If you recall from our previous
- 7:34:11step, this will occur during planning
- 7:34:15and the funds will be required on the
- 7:34:1715th of February.
- 7:34:20We have general supply requirements that
- 7:34:22will be required on the 15th of February
- 7:34:25as well. Now during the actual event, we
- 7:34:29need to pay for beverages, catering and
- 7:34:33in addition actual meeting requirements
- 7:34:38in this case to support the catering.
- 7:34:40These funds are required on the 20th of
- 7:34:43February and we're going to pay the
- 7:34:46outstanding catering invoice on the
- 7:34:4924th. Again,
- 7:34:52take a look at the totals. The total
- 7:34:55requirement is our direct cost of
- 7:34:57$6,000.
- 7:35:02Now, one final area that we want to
- 7:35:06discuss regards estimation. There is a
- 7:35:09methodology that is commonly used called
- 7:35:12threepoint estimation.
- 7:35:15Many project managers use singlepoint
- 7:35:17estimation. They estimate time and costs
- 7:35:21by providing their best guess. There are
- 7:35:24some costs that are set. When this is
- 7:35:26the case, single point estimation
- 7:35:29suffices. In most cases, however,
- 7:35:32estimates may be impacted by a variety
- 7:35:35of factors.
- 7:35:38Threepoint averaging requires the
- 7:35:41project manager and the team to analyze
- 7:35:43three estimates.
- 7:35:45The most likely estimate is what the
- 7:35:48team believes will be the most likely
- 7:35:50costs. The pessimistic estimate
- 7:35:53considers risk and the worst case
- 7:35:55scenario. The optimistic estimate
- 7:35:58considers opportunities that may reduce
- 7:36:01costs.
- 7:36:03There are two ways to calculate
- 7:36:05threepoint.
- 7:36:07Note that the threepoint estimation is
- 7:36:09applicable to both cost and schedule
- 7:36:12estimates.
- 7:36:13So looking at threepoint averaging, we
- 7:36:17have an pessimistic amount of 45. Most
- 7:36:22likely it's going to cost us 25. And if
- 7:36:25everything works out perfectly, we may
- 7:36:29escape with only spending 20.
- 7:36:32Each one of the pessimistic most likely
- 7:36:35and optimistic numbers and estimates are
- 7:36:39multiplied by 1. We multiply the
- 7:36:43pessimistic 45 * 1 = 45. Most likely 25
- 7:36:47* 1 = 25. Optimistic 20 * 1 = 20.
- 7:36:5345 25 and 20 = 90. We divide this 90 by
- 7:36:593 and the estimate that we're going to
- 7:37:01go ahead and use is 30.
- 7:37:06Now we have something called threepoint
- 7:37:09estimation using per stands for program
- 7:37:13evaluation review technique. And this
- 7:37:16method is a little more complicated than
- 7:37:18the averaging method. The per method
- 7:37:22weighs the optimistic, most likely, and
- 7:37:24pessimistic estimates based on
- 7:37:26statistical norms. Studies have shown
- 7:37:30that the pessimistic and optimistic
- 7:37:32estimates will occur one out of every
- 7:37:35six times. The most likely estimate will
- 7:37:38occur four out of every six times. This
- 7:37:42weighted criterion is based on the
- 7:37:44conclusion that estimation accuracy
- 7:37:47follows a statistical standard
- 7:37:50distribution. The most likely falls
- 7:37:52within one standard deviation of the
- 7:37:54mean or approximately 67% of the time.
- 7:37:59The optimistic and pessimistic estimates
- 7:38:01fall within two or more standard
- 7:38:03deviations from the mean or
- 7:38:05approximately 16% for both. Hence the
- 7:38:10weights 1 4 and one. Use the per method
- 7:38:14in our example. Let's go ahead and take
- 7:38:17a look. We have our optimistic most
- 7:38:21likely and pessimistic
- 7:38:24estimates. They have not changed.
- 7:38:26However, the multipliers do. We multiply
- 7:38:29the pessimistic by 1. 1 * 45 for 45.
- 7:38:35Why? Because the pessimistic is going to
- 7:38:37occur one out of every six times. We
- 7:38:41multiply the most likely estimate of 25
- 7:38:44* 4 to equal 100. Why? According to the
- 7:38:48standard distribution, the most likely
- 7:38:51normally occurs four out of six times or
- 7:38:5467%.
- 7:38:56We multiply the optimistic 20 * 1 to
- 7:38:59equal 20. Why? Because the optimistic is
- 7:39:02only going to occur one out of every six
- 7:39:05times or approximately 16%.
- 7:39:08We add up our totals 45 120 to get to
- 7:39:13165. However, we're now going to divide
- 7:39:17165 by 6. When we take 165 and divide it
- 7:39:23by 6, now the estimate that we're going
- 7:39:25to use is 27.5.
- 7:39:31This concludes our overview of project
- 7:39:34budgeting. As a quick summary, remember
- 7:39:38we have two steps
- 7:39:42or we can combine the two steps with one
- 7:39:46step called the resource breakdown
- 7:39:48structure.
- 7:39:50And we learned an estimation technique
- 7:39:52called threepoint.
- 7:39:54Thank you for your attention and we look
- 7:39:57forward to sharing more project
- 7:39:59management best practices with you
- 7:40:02in demos to follow. Have a great rest of
- 7:40:05your day.
- 7:40:09[Music]
- 7:40:17Welcome to the project information
- 7:40:19sharing and risk management course.
- 7:40:22This course is ideal for beginners or
- 7:40:25professionals with business experience
- 7:40:27who want to sharpen their business
- 7:40:29skills or even transition into a project
- 7:40:32management role. This course provides
- 7:40:35information and best practices in three
- 7:40:38key areas of project management
- 7:40:40including the importance of life cycles,
- 7:40:42effective information sharing and risk
- 7:40:45management. Concepts related to these
- 7:40:48areas are presented in five modules and
- 7:40:51the last module will provide you with an
- 7:40:53opportunity to apply your newly acquired
- 7:40:56skills in a graded project. Module one
- 7:40:59introduces different project life cycles
- 7:41:02and life cycles provide a road map for
- 7:41:04project managers to follow. A project
- 7:41:07life cycle provides a step-by-step
- 7:41:10approach to planning, executing, and
- 7:41:12implementing a project in a proven way.
- 7:41:15The proper use of the project life cycle
- 7:41:18can aid a project manager in preventing
- 7:41:20project failure. Now it is said that
- 7:41:23communication is the glue that holds the
- 7:41:26project together. Well, module 2
- 7:41:28provides insights into why effective
- 7:41:31communication is important in project
- 7:41:33management. The module also introduces
- 7:41:36different communication styles and
- 7:41:38provides tips for effective
- 7:41:40communication. The project management
- 7:41:43institute or PMI states that the
- 7:41:46greatest challenge faced by project
- 7:41:47managers is maintaining stakeholder
- 7:41:50commitment and motivation to support the
- 7:41:52project. Module 3 provides an
- 7:41:55understanding of stakeholder management.
- 7:41:58The module also introduces tools that a
- 7:42:00project manager can use to identify
- 7:42:02stakeholders and gain their commitment
- 7:42:04and support. You will also be introduced
- 7:42:07to the team charter, an essential aspect
- 7:42:10of stakeholder management. Module 4 gets
- 7:42:14you started with project risk
- 7:42:15management. This module introduces you
- 7:42:18to the basic terminology such as risk,
- 7:42:21threat, opportunity, and issue. The
- 7:42:24module also initiates you into some key
- 7:42:27concepts in risk management. Module 5
- 7:42:30delves into the response strategies that
- 7:42:33can be used to mitigate risk. You will
- 7:42:35also be introduced to tools and methods
- 7:42:38such as risk audits and risk
- 7:42:40reassessment. Finally, in module 6, you
- 7:42:44will have the opportunity to apply the
- 7:42:46concepts you've learned in the course to
- 7:42:48a project. You will submit your work and
- 7:42:51also grade your peers and this is
- 7:42:53followed by a final assessment quiz. Now
- 7:42:57this course will be an aid if you plan
- 7:42:59to attain any PMI certifications
- 7:43:02including certified associate in project
- 7:43:05management or PMI CAPM, project
- 7:43:08management professional or PMI PMP or
- 7:43:12project risk management certification or
- 7:43:15PMI RMP. You can review the opportunity
- 7:43:19to qualify and attain these
- 7:43:20certifications at PMI.org.
- 7:43:24So, there's a lot to cover here. To get
- 7:43:26the most from this course, make sure to
- 7:43:29view each video, check your learning
- 7:43:31with each quiz, and complete all the
- 7:43:33hands-on labs. And if you have any
- 7:43:36trouble with any of the course material,
- 7:43:38please don't hesitate to contact us in
- 7:43:41the discussion forum. Thank you for
- 7:43:43being part of our course and welcome. We
- 7:43:46look forward to sharing this critical
- 7:43:48project management knowledge with you.
- 7:43:53[Music]
- 7:44:02Welcome to life cycle overview. After
- 7:44:04watching this video, you will be able to
- 7:44:07compare predictive and adaptive life
- 7:44:09cycles, describe the importance of using
- 7:44:12a project life cycle, and summarize the
- 7:44:14pitfalls of failing to follow an
- 7:44:16appropriate project life cycle. So a
- 7:44:20life cycle is a series of phases a
- 7:44:22project passes through to meet the
- 7:44:24project requirements. Now the project
- 7:44:26management institute or PMI recommends a
- 7:44:29step-by-step life cycle for product and
- 7:44:32predictive projects. These life cycles
- 7:44:35are based on the plan do check act or
- 7:44:38PDCA cycle developed by W. Edwards Demi.
- 7:44:42Whereas the adaptive or agile life cycle
- 7:44:44is based on the plan, do check, learn or
- 7:44:47PDCL cycle. The product life cycle
- 7:44:51begins with an idea and that idea is
- 7:44:54then delivered, grows, matures and
- 7:44:56retires. The success of each product
- 7:44:59life cycle depends on well-defined
- 7:45:01projects and competent project
- 7:45:04management. The predictive life cycle,
- 7:45:06also called waterfall projects, is the
- 7:45:09primary life cycle. The predictive life
- 7:45:11cycle process groups are initiating,
- 7:45:14planning, executing, monitoring and
- 7:45:16controlling and closing. Now, the
- 7:45:19adaptive life cycles make up the
- 7:45:21variations of agile and the most popular
- 7:45:24form of agile is called scrum. Agile
- 7:45:27defines requirements as user stories.
- 7:45:30Project managers prioritize the user
- 7:45:32stories and ready them for project
- 7:45:34implementation by entering them in the
- 7:45:37product backlog. They then divide the
- 7:45:39projects into 15 or 30-day iterations or
- 7:45:43sprints. Project managers implement,
- 7:45:45review, and release user stories, then
- 7:45:48select new user stories from the product
- 7:45:51backlog for the second iteration.
- 7:45:53Project life cycles allow a systematic
- 7:45:56approach to planning, executing,
- 7:45:58controlling, and closing projects. The
- 7:46:01top benefits of following a project life
- 7:46:03cycle are that it provides a structure
- 7:46:05for project delivery, improves team
- 7:46:08member communication, enables progress
- 7:46:10tracking across the organization,
- 7:46:12provides for progressive evolution of
- 7:46:15the project, and enables structured
- 7:46:17reviews to support governance. Now,
- 7:46:20predictive life cycles are best suited
- 7:46:22for projects whose stakeholders agree on
- 7:46:25a clear end goal that is unlikely to
- 7:46:27change, that require low technological
- 7:46:30complexity, and that require low needs
- 7:46:33for creativity and innovation. Adaptive
- 7:46:36life cycles are best suited for projects
- 7:46:38whose stakeholders are at a moderate to
- 7:46:40low level of agreement on how they will
- 7:46:42measure project success, that have
- 7:46:45multiple changes in specifications as
- 7:46:47the project evolves, that require high
- 7:46:50technological complexity, and that
- 7:46:52require high needs for creativity and
- 7:46:55innovation.
- 7:46:56Project managers use five criteria to
- 7:46:59determine success after a project. Using
- 7:47:02a life cycle allows the project team to
- 7:47:05ensure the following. The team completes
- 7:47:07the project scope according to the
- 7:47:09objectives developed and approved in the
- 7:47:11project charter. On-time completion of
- 7:47:14the project according to the approved
- 7:47:16schedule baseline. The team completes
- 7:47:18the project within budget. The project
- 7:47:21meets the project management plan and
- 7:47:23avoids scope creep which is the
- 7:47:25inclination to exceed project
- 7:47:27requirements. and the final product or
- 7:47:30service is fit for use by the customer.
- 7:47:34In this video, you learned that a life
- 7:47:36cycle is a series of phases a project
- 7:47:39completes to meet requirements and a
- 7:47:41systematic approach to project planning,
- 7:47:44executing, controlling, and closing.
- 7:47:47Predictive life cycles are best for
- 7:47:49projects that have a clear unchanging
- 7:47:52end goal and low needs for technological
- 7:47:54complexity, creativity, and innovation.
- 7:47:58Adaptive life cycles are best for
- 7:48:00projects that have an unclear goal and
- 7:48:02high needs for technological complexity,
- 7:48:05creativity, and innovation. And using a
- 7:48:08life cycle ensures five criteria for
- 7:48:11project success.
- 7:48:15[Music]
- 7:48:21Welcome to expert viewpoints life cycle
- 7:48:24selection management. In this video, we
- 7:48:27will hear from project managers
- 7:48:28discussing common project life cycles
- 7:48:30they use in their organization and how
- 7:48:32they would use the life cycles in a
- 7:48:34project.
- 7:48:36And based on my experience, I just
- 7:48:38really want to share three of them. One
- 7:48:40of them is the traditional waterfall
- 7:48:42model. This is wonderful for events,
- 7:48:45straightforward projects. You simply
- 7:48:48plan. Once you have your plan, you
- 7:48:50implement the plan. You do it. You check
- 7:48:52to make sure that the plan is working
- 7:48:54and you follow up and you deliver the
- 7:48:57product or the service or you go back
- 7:48:59and fix it. I do an awful lot of process
- 7:49:02development and process improvement work
- 7:49:04as well. And another common life cycle
- 7:49:06that I like to use is what we call the
- 7:49:08deic model. Deic stands for define,
- 7:49:11measure, analyze, implement, and
- 7:49:13control. If you ever study for six
- 7:49:16sigma, if you're looking to become a
- 7:49:18green belt or perhaps even a black belt,
- 7:49:21you will be asked to go ahead and
- 7:49:23implement a six sigma project, a process
- 7:49:26development or process improvement pro
- 7:49:28project and you will get an opportunity
- 7:49:30to use that DMIC or deic model. The last
- 7:49:34model that I want to go ahead and share
- 7:49:36is an agile model, but in particular
- 7:49:39scrum. I enjoy using Scrum when we need
- 7:49:44some kind of an iterative process, when
- 7:49:46the customer is looking for quick
- 7:49:48deliveries, and when we anticipate an
- 7:49:51awful lot of change.
- 7:49:54A common life cycle that we use in our
- 7:49:56organization includes initiating,
- 7:49:59planning, executing, monitoring, and
- 7:50:01controlling and closing. In practice, in
- 7:50:05my organization, I work closely with our
- 7:50:07Google partnership. We initiate our
- 7:50:09project with Google but this can apply
- 7:50:11to any project by really discovering the
- 7:50:15scope of what needs to be accomplished
- 7:50:17through the project. So if they want to
- 7:50:20make refresh a certificate for example
- 7:50:24then we have a conversation with Google
- 7:50:26to understand well which components are
- 7:50:27we refreshing um what is our timeline
- 7:50:32where what's our budget and from there
- 7:50:35we move on to selecting a vendor and
- 7:50:38when we talk to the vendor we let them
- 7:50:39know the scope of the project then and
- 7:50:42if and give them more granular details
- 7:50:44of what needs to be accomplished and
- 7:50:47then come back to us with their proposed
- 7:50:49timeline as well as their um proposed
- 7:50:52deliverables based on what Google needs.
- 7:50:55Um which then moves us over to planning
- 7:50:57and planning is very collaborative. in
- 7:50:59my particular instance involves Google
- 7:51:02and vendors. And that's where we really
- 7:51:04get through finalizing the timeline,
- 7:51:07finalizing the smaller the more granular
- 7:51:11chunks of a specific timeline when we
- 7:51:13want to have specific deliverables like
- 7:51:15videos, assessments, readings, etc. And
- 7:51:18then when we also want to time a lot
- 7:51:20time for QA and review, then that moves
- 7:51:23us over to executing. And in the
- 7:51:25execution phase, that's when we really
- 7:51:27get into putting our heads down and
- 7:51:29doing the work. And that brings us over
- 7:51:32to monitoring and controlling. I think
- 7:51:34there are different ways to handle
- 7:51:36monitoring and controlling. I personally
- 7:51:38like to have weekly check-ins and then
- 7:51:41also disperse larger check-ins between
- 7:51:44the vendor and Google and myself where
- 7:51:47we really delved into the details of the
- 7:51:49project. However, I do have colleagues
- 7:51:52that do something more like um daily
- 7:51:54stand-ups, which I have done in the past
- 7:51:56as well, and then something more like
- 7:51:58bi-weekly meetings. I think it really
- 7:52:00just depends on the cadence of your or
- 7:52:03your desired cadence as well as how
- 7:52:06everyone works together. And then
- 7:52:08finally, that brings us over to closing
- 7:52:10of the project. Assuming everything goes
- 7:52:12well, and you always hope that it does,
- 7:52:14um you close right on time. And if it
- 7:52:16does not, then you uh figure out where
- 7:52:18you have room to extend your deadline.
- 7:52:21And at closing, I think it's always fun
- 7:52:23to celebrate the project, celebrate
- 7:52:25milestones, and then also do a recap of
- 7:52:27what went well and what did not go well.
- 7:52:30>> There's a gentleman named Ralph Stacy
- 7:52:31who came up with a wonderful model that
- 7:52:34is a best practice in project selection
- 7:52:37today. Stacy said that take a look at
- 7:52:40two key aspects of a project. One of
- 7:52:43them is technical complexity and the
- 7:52:46other is the level of agreement and by
- 7:52:48agreement I mean agreement among the
- 7:52:50stakeholders in terms of what does
- 7:52:52success look like at the end of the day.
- 7:52:55When the technology is extremely complex
- 7:52:57and there is minimal agreement which
- 7:52:59means the majority of the stakeholders
- 7:53:02really have no clue what they want in
- 7:53:04the end then agile is probably the best
- 7:53:07way to go. However, if the technology is
- 7:53:10relatively straightforward, you don't
- 7:53:12anticipate a lot of problems and there
- 7:53:15is general agreement among the
- 7:53:16stakeholders that regardless of how long
- 7:53:19this particular project takes, at the
- 7:53:21end of the day, this is what we want,
- 7:53:23then probably waterfall is your best
- 7:53:25bet.
- 7:53:28[Music]
- 7:53:34Welcome to adaptive life cycles. After
- 7:53:37watching this video, you will be able to
- 7:53:40identify artifacts used in adaptive
- 7:53:42projects, define the purpose and makeup
- 7:53:45of a user story and a product backlog,
- 7:53:48and explain the adaptive flow through
- 7:53:50planning, execution, and closure. Now,
- 7:53:54artifacts are templates, documents,
- 7:53:56outputs or deliverables. And in adaptive
- 7:54:00projects, there are three common
- 7:54:02artifacts to remember and be aware of.
- 7:54:05product backlog, sprint backlog and
- 7:54:07product increments. The product backlog
- 7:54:10is a list or repository for all project
- 7:54:13requirements which the product owner
- 7:54:15develops and maintains. In adaptive
- 7:54:18project management, the product owner
- 7:54:21defines and documents requirements as a
- 7:54:24user story. The product owner then adds
- 7:54:27and prioritizes user stories to the
- 7:54:30backlog and works with the team to
- 7:54:32determine which user stories the team
- 7:54:34will accomplish in a single iteration or
- 7:54:37sprint. A product launch may have a few
- 7:54:40or many user stories. In addition, a
- 7:54:43product backlog may include user stories
- 7:54:46for single or multiple product launches.
- 7:54:49A minimal viable product or MVP is an
- 7:54:53increment the team produces in a single
- 7:54:55sprint. Next, the agile team develops
- 7:54:58the sprint backlog. The team selects a
- 7:55:01set number of user stories for
- 7:55:03implementation in each sprint. The
- 7:55:06sprint backlog breaks each user story
- 7:55:08into tasks the team must accomplish. The
- 7:55:12project owner lists tasks in the order
- 7:55:14in which they occur and assigns them to
- 7:55:17individual team members. The team uses
- 7:55:20the sprint backlog to stay on track and
- 7:55:22reduce the potential for scope creep.
- 7:55:25And in a traditional predictive project,
- 7:55:27the sprint backlog has the same
- 7:55:29characteristics as a work breakdown
- 7:55:32structure or WBS.
- 7:55:34Now, product increments are deliverables
- 7:55:37from each iteration the team produces
- 7:55:39and delivers to the customer for
- 7:55:41feedback through a product demo or
- 7:55:44review. Every sprint should provide the
- 7:55:46value as an increment. However, this
- 7:55:49increment does not necessarily represent
- 7:55:51the final product. During an agile
- 7:55:54project, the team builds a product one
- 7:55:57part at a time, and the final product
- 7:55:59will typically require multiple sprints
- 7:56:01before launching the finished product.
- 7:56:04There are two parts to a user story.
- 7:56:07Part one of the user story is the
- 7:56:09requirement description the product
- 7:56:11owner completes with the customer. And
- 7:56:13the user story requirement contains
- 7:56:16three statements. The role or who needs
- 7:56:19this requirement, the need or what the
- 7:56:21specific need of the customer is, and
- 7:56:24the business value of satisfying the
- 7:56:26need. Part two of the user story is the
- 7:56:29acceptance criteria. The product owner
- 7:56:32collaborates with the agile team and
- 7:56:34determines solutions to satisfy the user
- 7:56:37story. The product owner shares
- 7:56:39solutions with the customer, gains
- 7:56:42signoff, and then includes the user
- 7:56:44story in the backlog. Now, product
- 7:56:47owners should follow the deep or de
- 7:56:50model when creating a product backlog.
- 7:56:54Detail. The product owner should ensure
- 7:56:56they include enough detail in each user
- 7:56:59story to allow the team to build the
- 7:57:01solution successfully. Estimate each
- 7:57:04user story requirement and solution
- 7:57:07definition must be specific and
- 7:57:09measurable to the point where a team can
- 7:57:11determine the time and cost required
- 7:57:14emerge. The product backlog will change
- 7:57:17after each sprint. Customers may wish to
- 7:57:20add or modify requirements due to
- 7:57:23feedback the team receives at the demo.
- 7:57:25And finally, prioritize. Product owners
- 7:57:29should prioritize all user stories for
- 7:57:31the team to accomplish them. And product
- 7:57:34owners prioritize user stories on value
- 7:57:37and the logical order of product
- 7:57:39completion. Now, the agile project
- 7:57:42management overview process consists of
- 7:57:45nine steps. Step one, the product owner
- 7:57:48meets with the customers to determine
- 7:57:50their product requirements and discuss
- 7:57:52schedules and budget considerations.
- 7:57:55Step two, the product owner develops
- 7:57:58user stories to satisfy all product
- 7:58:00requirements with the customer. Step
- 7:58:02three, the product owner meets with the
- 7:58:05team who reviews each user story and
- 7:58:07proposes the acceptance criteria to
- 7:58:10develop an increment or MVP. Step four,
- 7:58:14the product owner shares the user story
- 7:58:16acceptance criteria with the customer
- 7:58:18which validates the user story. Step
- 7:58:21five, the product owner places all user
- 7:58:24stories in the product backlog and
- 7:58:26prioritizes them in the order in which
- 7:58:29they occur. Step six, the team meets
- 7:58:32with the product owner and determines
- 7:58:34how many user stories the team will
- 7:58:36accomplish in the first sprint. The team
- 7:58:39selects the user stories and develops a
- 7:58:41sprint backlog. Step seven, the team
- 7:58:44works to complete the user story MVP.
- 7:58:47Remember that agile sprints are time
- 7:58:49boxed and the norm is 15 or 30 days. If
- 7:58:53the team cannot complete all user story
- 7:58:56requirements, the team carries the user
- 7:58:58story over to the next sprint. The agile
- 7:59:01sprints do not extend. Step eight, the
- 7:59:05team provides a demo at the end of the
- 7:59:07sprint for customer feedback. The
- 7:59:09product owner refineses or updates the
- 7:59:12product backlog. The team meets for a
- 7:59:14retrospective meeting to discuss what
- 7:59:17went well and what change makes the most
- 7:59:19sense to implement in the next sprint.
- 7:59:22And finally, step nine. The team
- 7:59:25continues to repeat this process from
- 7:59:27step six until the team completes all
- 7:59:30sprints to produce a final product.
- 7:59:33In this video, you learned artifacts are
- 7:59:36templates, documents, outputs, or
- 7:59:38deliverables. And there are three common
- 7:59:41artifacts. The product backlog is a list
- 7:59:44of all project requirements the product
- 7:59:46owner develops and maintains. The sprint
- 7:59:49backlog is the specific tasks from the
- 7:59:52user story that the agile team develops.
- 7:59:54And the product increment is
- 7:59:56deliverables from each sprint that the
- 7:59:59team provides to the customer for
- 8:00:01feedback. A user story is the
- 8:00:03requirement description and acceptance
- 8:00:05criteria. The product backlog follows
- 8:00:08the deep model and the nine stepbystep
- 8:00:11overview of the agile project management
- 8:00:14process.
- 8:00:17[Music]
- 8:00:26Welcome to project initiation. After
- 8:00:29watching this video, you will be able to
- 8:00:32summarize the project initiation phase,
- 8:00:35explain the roles and responsibilities
- 8:00:37of the project manager, describe the
- 8:00:39project charter and stakeholder
- 8:00:41register, and explain the project
- 8:00:43charter approval process.
- 8:00:46Now, the project initiation phase
- 8:00:48provides an opportunity to define a
- 8:00:51project for stakeholder approval and to
- 8:00:53begin effective project planning. The
- 8:00:56steps for correctly initiating the
- 8:00:58project include the problem or
- 8:01:00opportunity is identified. The initial
- 8:01:03business case with a benefits analysis
- 8:01:06or statement of work s is approved. The
- 8:01:10project charter is developed. The
- 8:01:12stakeholder register is developed. The
- 8:01:14pre-baseline is approved by stakeholders
- 8:01:17and the project charter is approved for
- 8:01:20planning. The benefits of using the
- 8:01:22project initiation phase include
- 8:01:25ensuring the project meets the
- 8:01:26organization's needs, gaining agreement
- 8:01:29on project objectives, mapping the
- 8:01:32project to the programs and portfolio,
- 8:01:35identifying and informing stakeholders
- 8:01:37of responsibilities, and it authorizes
- 8:01:40the project manager to proceed to the
- 8:01:42planning phase. The key roles project
- 8:01:45managers must complete in the initiation
- 8:01:48phase include the following. working
- 8:01:50closely with program and portfolio
- 8:01:53managers to understand the business
- 8:01:55needs and benefits of the project.
- 8:01:57Reviewing the business case driving the
- 8:02:00project if applicable. Understanding the
- 8:02:02role of a business analyst to develop a
- 8:02:05business case in the event a business
- 8:02:07analyst is not part of the project.
- 8:02:10working with stakeholders to ensure
- 8:02:12understanding of the project objectives
- 8:02:14and presenting the project charter to
- 8:02:17the project sponsor in a pre-baseline
- 8:02:20presentation.
- 8:02:21Here are the key responsibilities of
- 8:02:23project managers during the initiation
- 8:02:26phase. Developing and staffing key
- 8:02:28documents for approval including a
- 8:02:31business case, project charter or
- 8:02:33stakeholder register. Determining key
- 8:02:36stakeholders required to achieve project
- 8:02:38success. Also documenting roles and
- 8:02:41responsibilities and gaining stakeholder
- 8:02:43commitment to the project, gaining
- 8:02:46project charter approval before moving
- 8:02:48to the planning phase and working with
- 8:02:51the project team to determine if the
- 8:02:53project adds value to the problem. A
- 8:02:56project charter may include an approval
- 8:02:58or recommendation to defer or cancel a
- 8:03:01project. So, the project charter and
- 8:03:04stakeholder register are part of a
- 8:03:06four-step process to achieve project
- 8:03:09success. Steps one and two define what
- 8:03:12and why and are accomplished in the
- 8:03:15project charter. Step three defines who
- 8:03:18needs to be involved and is accomplished
- 8:03:20in the stakeholder register. And step
- 8:03:23four defines how and is accomplished in
- 8:03:26the planning phase. Now the project
- 8:03:29charter is completed by the project
- 8:03:31manager in a straightforward process.
- 8:03:34Understand the business case and project
- 8:03:36benefits. Develop the project charter
- 8:03:39and stakeholder register with
- 8:03:41stakeholders. Present the charter to the
- 8:03:43project sponsor in a pre-baseline
- 8:03:46presentation with a recommendation to
- 8:03:48approve, defer, or cancel the project
- 8:03:51and share the charter with stakeholders
- 8:03:54and begin project planning.
- 8:03:57In this video, you learned that the
- 8:03:59project initiation phase defines the
- 8:04:02project for stakeholder approval. The
- 8:04:04key roles and responsibilities of the
- 8:04:07project manager during the initiation
- 8:04:09phase include understanding business
- 8:04:11needs of the project, developing key
- 8:04:14documents for approval, identifying
- 8:04:16stakeholders and gaining their
- 8:04:18commitment, working with stakeholders to
- 8:04:21understand objectives, and presenting a
- 8:04:23pre-baseline presentation to the project
- 8:04:26sponsor for approval. The project
- 8:04:28charter defines the what and why of a
- 8:04:31project. And finally, the stakeholder
- 8:04:33register defines who is involved in the
- 8:04:36project.
- 8:04:39[Music]
- 8:04:47Welcome to project planning. After
- 8:04:50watching this video, you will be able to
- 8:04:52describe the importance of the project
- 8:04:54planning phase, explain the roles and
- 8:04:57responsibilities of the project manager,
- 8:05:00describe the importance of an organized
- 8:05:02project planning approach, and explain
- 8:05:05the project management approval process
- 8:05:07and kickoff meeting. The project
- 8:05:10management life cycle aligns with the
- 8:05:12plan, do check, act or PDCA methodology.
- 8:05:16The project management institute or PMI
- 8:05:20framework outlines 49 steps recommended
- 8:05:22to plan and deliver a project
- 8:05:25successfully and 24 of those steps fall
- 8:05:28in the planning phase. This is close to
- 8:05:3050% of the total project steps. So
- 8:05:34planning is critical. The project
- 8:05:36manager guides and controls the endtoend
- 8:05:39planning process. The project manager
- 8:05:42enlists the support of the project team
- 8:05:44but is ultimately responsible for the
- 8:05:46project results. If the project fails,
- 8:05:49the project manager is held accountable.
- 8:05:53Now the key responsibilities of the
- 8:05:55project manager include ensuring subject
- 8:05:58matter experts or SMEES are documented
- 8:06:00and approved in the project charter,
- 8:06:03documenting personnel support needs in
- 8:06:05the stakeholder register, ensuring key
- 8:06:08support personnel have the skills and
- 8:06:10capacity to support the project,
- 8:06:12developing and following a comprehensive
- 8:06:15project management plan, working with
- 8:06:17the planning team and supporting their
- 8:06:20needs, including addressing blockers.
- 8:06:22and being inclusive in the planning
- 8:06:25process, staffing each major part of the
- 8:06:27plan and getting buyin before moving
- 8:06:30forward. Now, the project management
- 8:06:33plan consists of a series of smaller
- 8:06:35plans compiled to provide an overall
- 8:06:38view of the project. Understanding the
- 8:06:40steps involved in developing a
- 8:06:42comprehensive project management plan
- 8:06:44for the certified associate in project
- 8:06:47management or CAPM test is essential. So
- 8:06:51once the project charter is approved,
- 8:06:53the project management plan steps are to
- 8:06:56define the scope, define the schedule
- 8:06:58and budget, complete support planning,
- 8:07:01approve the project plan, conduct a
- 8:07:03kickoff meeting, and create a project
- 8:07:06baseline. The first planning step is to
- 8:07:09plan the scope of the project. The scope
- 8:07:11should reflect all requirements listed
- 8:07:14and approved in the project charter.
- 8:07:16Even if there are not enough time and
- 8:07:18budget to implement the total scope of
- 8:07:20the project, we still plan the full
- 8:07:23scope at this step. Project managers may
- 8:07:26conduct negotiations if the scope needs
- 8:07:28reduction and stakeholders and sponsors
- 8:07:31receive the proposed scope during a
- 8:07:34meeting before the meeting. The next
- 8:07:36step for the project manager is to
- 8:07:38develop a project schedule and budget to
- 8:07:41meet the total scope needs of the
- 8:07:43project. The project manager may need to
- 8:07:46balance the triangle if there is not
- 8:07:48enough time or budget to meet the
- 8:07:50comprehensive needs of the project. The
- 8:07:52triangle represents scope, time, and
- 8:07:55cost. Project managers negotiate the
- 8:07:59scope, schedule, and funding to
- 8:08:01determine an acceptable solution for
- 8:08:03project implementation.
- 8:08:05The team may need to revisit scope
- 8:08:08planning to downsize the scope in order
- 8:08:10to meet realistic plans and budget
- 8:08:12resources.
- 8:08:14Now, after the project manager develops
- 8:08:17the scope, schedule, and budget, the
- 8:08:19project sponsor signs off on these
- 8:08:21plans, then the project manager
- 8:08:24establishes the project scope baseline,
- 8:08:26the schedule baseline, and the cost
- 8:08:28baseline. The term baseline indicates
- 8:08:32that the project sponsor and critical
- 8:08:34stakeholders approve of the plan. Next,
- 8:08:37the project manager begins the support
- 8:08:40planning stage, which is made up of
- 8:08:42several planning elements. The quality
- 8:08:45assurance or QA and quality control
- 8:08:48planning activities ensure the project
- 8:08:50conforms to quality requirements.
- 8:08:52Resource planning ensures the correct
- 8:08:55number of resources are available when
- 8:08:57needed and resources primarily include
- 8:09:00personnel, materials, supplies, and
- 8:09:03equipment. Communications planning
- 8:09:05ensures all team members are aware of
- 8:09:08their roles and responsibilities.
- 8:09:10Project risk management planning ensures
- 8:09:12risks are known in advance. Procurement
- 8:09:15management planning may be needed if
- 8:09:18third-party support from an external
- 8:09:20seller is required to achieve the scope
- 8:09:22and stakeholder engagement planning
- 8:09:25ensures that stakeholder commitment and
- 8:09:27engagement remains high. The project
- 8:09:30manager presents the final project plan
- 8:09:32to the project sponsor and then the
- 8:09:35sponsor will either approve or request
- 8:09:37revisions to the program. If the project
- 8:09:40manager has included the sponsor in the
- 8:09:42initial planning, it is more likely that
- 8:09:45the sponsor will support the plan. So
- 8:09:48once the sponsor signs off on the final
- 8:09:50project plan, the next step is to
- 8:09:52schedule a kickoff meeting. The goal of
- 8:09:55a kickoff meeting is to share the
- 8:09:57approved project management plan with
- 8:09:59project stakeholders and the project
- 8:10:01team to gain their approval and
- 8:10:04commitment to move the project to the
- 8:10:06executing phase. Now there is no
- 8:10:09established method to conduct a kickoff
- 8:10:11meeting. The PMI states that the meeting
- 8:10:14is to be scheduled before executing
- 8:10:17begins and there are six topics to
- 8:10:20address in this kickoff meeting. Project
- 8:10:22background. Why is the project necessary
- 8:10:25and what is the value of the project?
- 8:10:28Project scope. The stakeholders should
- 8:10:30agree on what will be accomplished by
- 8:10:32the project. the timeline, the risk
- 8:10:35management plan, the key roles and
- 8:10:37responsibilities, and defining the
- 8:10:40tools, templates, and standards used in
- 8:10:42the project.
- 8:10:44In this video, you learned that the
- 8:10:47planning phase is critical as it
- 8:10:49includes 24 out of the 49 steps to
- 8:10:52deliver a project. The project manager
- 8:10:55guides the end-to-end planning process
- 8:10:57and the project management life cycle
- 8:10:59plan includes the project charter
- 8:11:02approval, defining the scope, defining
- 8:11:05schedule and budget, completing the
- 8:11:07support plan, approving the project
- 8:11:09plan, conducting the kickoff meeting,
- 8:11:12and creating the project baseline.
- 8:11:17[Music]
- 8:11:26Welcome to project executing.
- 8:11:29After watching this video, you will be
- 8:11:31able to summarize the importance of the
- 8:11:34project executing phase, examine the
- 8:11:37roles and responsibilities of the
- 8:11:39project manager, and identify skills
- 8:11:42essential to project executing phase
- 8:11:44success. In the project executing phase,
- 8:11:48also called the implementation phase,
- 8:11:50the team completes tasks identified
- 8:11:53during the previous planning phase. The
- 8:11:55executing phase begins when the project
- 8:11:58management plan is approved by the
- 8:12:00sponsor and accepted by key
- 8:12:02stakeholders. And during this phase, the
- 8:12:05team produces the product or service
- 8:12:08which is delivered to the customer. Now
- 8:12:11certain processes should be followed to
- 8:12:13ensure a successful executing phase. The
- 8:12:16project manager implements the following
- 8:12:19nine processes during the executing
- 8:12:21phase. Acquire resources laid out in the
- 8:12:25project plan to support the project
- 8:12:27management plan. If resources are not
- 8:12:30acquired, project schedule may change.
- 8:12:33Send statements of work or SA to
- 8:12:36eligible sellers to find the best fit
- 8:12:38and develop a contract. If contracts are
- 8:12:41not finalized quickly, again, the
- 8:12:44schedule may change. Implement the
- 8:12:46communications management plan and keep
- 8:12:48it up to date and working as
- 8:12:51communication requirements will change
- 8:12:53throughout the process. You will learn
- 8:12:55about the communications management plan
- 8:12:57in another lesson. ensure quality
- 8:13:00assurance activities are implemented.
- 8:13:03Quality assurance or QA focuses on
- 8:13:06preventing issues and defects in the
- 8:13:08deliverables and ensures key executing
- 8:13:11processes and standards are being
- 8:13:13followed and manage project knowledge
- 8:13:16via status reporting and lessons
- 8:13:18learned. Now the remaining four
- 8:13:21execution process phases the project
- 8:13:23manager should follow are assist team
- 8:13:26members to develop their skills and
- 8:13:28provide constructive feedback to improve
- 8:13:31performance, manage the team and address
- 8:13:34issues as they occur and communicate
- 8:13:36effectively. Implement risk responses
- 8:13:39and work with risk owners to recognize
- 8:13:42when risks occur or are about to occur.
- 8:13:45And finally, maintain stakeholder
- 8:13:47engagement by implementing strategies to
- 8:13:50keep stakeholders motivated.
- 8:13:53So the project manager plays a critical
- 8:13:56role during the executing phase. The
- 8:13:58following roles and responsibilities
- 8:14:01should be followed by the project
- 8:14:02manager. Be accessible to the team and
- 8:14:06meet with them often to be aware of any
- 8:14:08issues. Manage effective meetings to
- 8:14:11ensure communication to the team. Manage
- 8:14:14change via the integrated change
- 8:14:16management system and ensure
- 8:14:18stakeholders adhere to it to avoid scope
- 8:14:21creep. Conduct and share lessons learned
- 8:14:24to assist future project managers by
- 8:14:26recommending solutions to problems
- 8:14:28encountered and monitor project support
- 8:14:31activities and ensure key quality
- 8:14:34procurement and risk management
- 8:14:36activities are accommodated and
- 8:14:39completed. Project management is most
- 8:14:42critical in the project executing phase
- 8:14:45for a successful completion. The project
- 8:14:47management institute or PMI defines 11
- 8:14:51key interpersonal skills essential to
- 8:14:54success. effective communication,
- 8:14:57leadership, motivation, conflict
- 8:15:00management, negotiation, coaching,
- 8:15:03political and cultural awareness,
- 8:15:05influencing, decision-m, team building,
- 8:15:09and finally trust building. In this
- 8:15:12video, you learned the project executing
- 8:15:15phase begins after the project
- 8:15:17management plan is approved. The team
- 8:15:20produces the product, service, or
- 8:15:22deliverables. During the executing
- 8:15:24phase, the key processes of the
- 8:15:27executing phase, the roles and
- 8:15:29responsibilities of the project manager,
- 8:15:32and the 11 interpersonal skills
- 8:15:34identified by the PMI for a successful
- 8:15:37executing phase.
- 8:15:41[Music]
- 8:15:50Welcome to project monitoring and
- 8:15:52controlling. After watching this video,
- 8:15:55you will be able to summarize the
- 8:15:58importance of the project monitoring and
- 8:16:00controlling phase, describe the
- 8:16:02integrated change control process,
- 8:16:05examine the roles and responsibilities
- 8:16:07of the project manager, and identify
- 8:16:10essential skills to project monitoring
- 8:16:13and phase success. Now the monitoring
- 8:16:16and controlling phase begins when the
- 8:16:18team produces the first deliverable. In
- 8:16:21this phase, the team verifies that all
- 8:16:23deliverables meet the specifications the
- 8:16:26project manager documents in the project
- 8:16:28management plan. In addition, the
- 8:16:30customer accepts the project
- 8:16:32deliverables. Integrated change control
- 8:16:35is also a part of the monitoring and
- 8:16:37controlling phase. Now there are eight
- 8:16:40monitoring and controlling phase
- 8:16:42processes. The quality control team
- 8:16:45inspects and verifies each deliverable
- 8:16:47the team produces and the team must
- 8:16:50correct deliverables with defects before
- 8:16:52transferring them to the customer. The
- 8:16:55project team validates the scope. The
- 8:16:57phrase the customer is always right
- 8:17:00holds true in project management. The
- 8:17:02deliverable is not complete until the
- 8:17:05customer accepts it. The project manager
- 8:17:08and team control the scope, schedule,
- 8:17:11and cost to meet the baseline
- 8:17:13commitments made in the project
- 8:17:15management plan. And the project manager
- 8:17:18controls resources and resource
- 8:17:20requirements may change as the project
- 8:17:23progresses. The project manager must
- 8:17:26communicate resource needs to the
- 8:17:28functional managers who oversee the
- 8:17:30resources. Let's now learn about the
- 8:17:33four remaining monitoring and
- 8:17:34controlling phase processes. The project
- 8:17:37manager monitors communications via the
- 8:17:40communications management plan which is
- 8:17:42kept up to date throughout the project.
- 8:17:45The project manager and team monitor
- 8:17:47risks and risks must be identified and
- 8:17:50acted upon if they occur. The project
- 8:17:53manager controls procurements,
- 8:17:55communicates with vendors or sellers and
- 8:17:58monitors them to ensure they produce
- 8:18:00what is outlined in the contract. And
- 8:18:03finally, the project manager monitor
- 8:18:06stakeholder engagement by implementing
- 8:18:08strategies to keep stakeholder
- 8:18:10commitment throughout the project. Now,
- 8:18:13the project manager and team develop an
- 8:18:16integrated change control process to
- 8:18:18ensure project change management. If the
- 8:18:21team does not control change, scope
- 8:18:23creep may occur. The integrated change
- 8:18:26control program is part of the project
- 8:18:28management plan. Sponsors and
- 8:18:31stakeholders approve this plan and the
- 8:18:33project manager enforces it.
- 8:18:35Stakeholders should commit to following
- 8:18:37this process to ensure a quality end
- 8:18:40product. So according to the project
- 8:18:43management institute or PMI, any
- 8:18:46project's two primary quality goals are
- 8:18:49to conform to requirements and provide a
- 8:18:53deliverable that is fit for use. There
- 8:18:56are three components of an integrated
- 8:18:58change control program. Process unique
- 8:19:00to the project. Change log and change
- 8:19:03form. The roles and responsibilities of
- 8:19:06the project manager during the
- 8:19:08monitoring and controlling phase include
- 8:19:11being accessible to the team and meeting
- 8:19:14often to stay on top of any issues or
- 8:19:17defects in the product. Managing
- 8:19:19effective meetings to ensure
- 8:19:21communication. Quality control and
- 8:19:23deliverable acceptance meetings are
- 8:19:26critical during this phase. Managing
- 8:19:28change with the integrated management
- 8:19:30system to ensure all stakeholders adhere
- 8:19:33to it. Sharing periodic lessons learned
- 8:19:36whether the product is a success or if
- 8:19:39there are issues and ensuring defective
- 8:19:43deliverables are not given to the
- 8:19:45customer and identifying and correcting
- 8:19:48defects as soon as possible. To ensure a
- 8:19:51successful project monitoring and
- 8:19:53controlling phase, the project manager
- 8:19:56must do the following. Perfect the 11
- 8:19:59critical interpersonal skills the PMI
- 8:20:01defines as essential to success. And we
- 8:20:05do cover these in another lesson, but as
- 8:20:07a review, these include effective
- 8:20:10communication, leadership, motivation,
- 8:20:13conflict management, negotiation,
- 8:20:15coaching, political and cultural
- 8:20:18awareness, influencing, decision-m, team
- 8:20:21building, and trust building. And the
- 8:20:24project manager must also understand and
- 8:20:27acknowledge external stakeholders and
- 8:20:29customers needs and develop
- 8:20:31collaboration skills to ensure a
- 8:20:33successful interaction with both.
- 8:20:37In this video, you learned that the
- 8:20:39monitoring and controlling phase begins
- 8:20:42when the team produces the first
- 8:20:44deliverable. The customer accepts
- 8:20:46deliverables that meet the
- 8:20:47specifications in the project management
- 8:20:50plan. The integrated change control
- 8:20:52program has three components. Process
- 8:20:55unique to the project change log and
- 8:20:58change form. The project manager and
- 8:21:01team develop an integrated change
- 8:21:03control process to ensure project change
- 8:21:06management. And the project manager's
- 8:21:09roles and responsibilities in this phase
- 8:21:12include the 11 PMI interpersonal skills
- 8:21:15and understanding stakeholders and
- 8:21:18customers needs.
- 8:21:22[Music]
- 8:21:29Welcome to expert viewpoints project
- 8:21:32failure. In this video, we will hear
- 8:21:34from project managers discussing what
- 8:21:36causes project failures and how to
- 8:21:38overcome these challenges.
- 8:21:42>> Problem number one, lack of planning.
- 8:21:45There's a feeling amongst some managers
- 8:21:47that projects are so simple, all we have
- 8:21:51to do is just do it. And unfortunately,
- 8:21:53many, many projects kick off without a
- 8:21:56true understanding of the customer's
- 8:21:58requirements and expectations. Before
- 8:22:01you begin your planning, the first
- 8:22:03planning step is to sit down with your
- 8:22:05customer, sit down with the end users.
- 8:22:07Sit down with the individuals who are
- 8:22:09going to be impacted by this product or
- 8:22:11service and truly understand their
- 8:22:14expectations. What is the current ASIS
- 8:22:17state and what is the best to be state?
- 8:22:20And understand where you want to go
- 8:22:23before you try to get there. The second
- 8:22:25area that I want to go ahead and discuss
- 8:22:27is what we call a lack of inclusion.
- 8:22:30Oftenimes project managers and the team
- 8:22:33plan in a vacuum. They get to the end of
- 8:22:35planning. They present the project plan
- 8:22:37to all of the key stakeholders and the
- 8:22:39key stakeholders have one reaction. Huh?
- 8:22:42That is not the reaction that you are
- 8:22:44looking for. Keep the stakeholders and
- 8:22:47the key stakeholders informed as the
- 8:22:49planning occurs. Your mantra should be
- 8:22:52no surprises. Have the meeting before
- 8:22:54the meeting. You're going to have to go
- 8:22:57ahead and get formal sign off from the
- 8:22:59sponsor and the stakeholder on all of
- 8:23:01the project plans, but the meeting
- 8:23:03before the meeting is informal. Get that
- 8:23:06okay before you go into that formal
- 8:23:08meeting. And hopefully that formal
- 8:23:10meeting is a rubber stamp and everybody
- 8:23:12is happy.
- 8:23:14>> Some common causes of project failure
- 8:23:16that I have encountered are poor
- 8:23:19planning and poor scoping from the
- 8:23:20get-go, a lack of staffing, and poor
- 8:23:24leadership.
- 8:23:25The most common cause of project failure
- 8:23:27that I've seen over the years is simply
- 8:23:30a lack of regular, predictable
- 8:23:32communication by the project manager.
- 8:23:34It's really easy to get distracted and
- 8:23:36swept up in fire drills and other
- 8:23:38people's priorities. Maybe a weekly
- 8:23:40status report doesn't go out to the
- 8:23:42client or a team meeting has to be
- 8:23:44skipped. This, of course, is going to
- 8:23:46happen from time to time, but if it
- 8:23:48starts happening a lot, you'll notice
- 8:23:50that the project team starts to slowly
- 8:23:52fall apart. Maybe they'll go quiet or
- 8:23:55there's some confusion on what they
- 8:23:56should do next. This also makes clients
- 8:23:59really anxious when they don't know the
- 8:24:01status of project tasks and they start
- 8:24:03to feel that things are not in control.
- 8:24:05All these factors are going to lead to
- 8:24:07churn and cause huge delays. Probably
- 8:24:10the top reason projects fail is uh
- 8:24:13because the right people are not in
- 8:24:15place to do the jobs that they've been
- 8:24:16assigned. So what I mean by that is a
- 8:24:19lot of times I work with teams and
- 8:24:20there's very talented people but
- 8:24:22sometimes they're misplaced. So a person
- 8:24:24may be doing for example project
- 8:24:27management when he or she should be
- 8:24:29doing a different type of job um some
- 8:24:31sort of development or uh you know
- 8:24:33working with creative um that happens
- 8:24:35quite a bit in teams um and you'll see
- 8:24:39projects not functioning properly
- 8:24:41because people are not in the roles that
- 8:24:43they should be in. Um, another big cause
- 8:24:46of project failure is um a lack of
- 8:24:48vision, a lack of clarity on where the
- 8:24:50project is going. So, a lot of times I I
- 8:24:53will see um people that get really
- 8:24:56excited at the beginning of the project
- 8:24:57and they think they have a sense of what
- 8:24:59they need to be delivering. Um but
- 8:25:01either the scope changes, so upper
- 8:25:03management or someone on the team will
- 8:25:05add um new features that need to go into
- 8:25:07the into the project or um they'll
- 8:25:10change scope without telling the team
- 8:25:12and then the team is constantly failing
- 8:25:14because they're not meeting the demands
- 8:25:15of the project. um or people just don't
- 8:25:18know uh what they're supposed to be
- 8:25:20working on and why they're working on
- 8:25:21it. So that lack of constant reminding
- 8:25:24the team and this is the vision, this is
- 8:25:26what we're doing, this is why we're
- 8:25:27doing it. Um I think is really important
- 8:25:29and when that doesn't happen, you see uh
- 8:25:31projects start to go off the rails and
- 8:25:33and sometimes fail.
- 8:25:36The best tips that I can provide you is
- 8:25:38to be open, have no secrets, communicate
- 8:25:42effectively. Sometimes
- 8:25:44at the risk of overcommunicating,
- 8:25:47give people the information. It's better
- 8:25:50to give people information twice than
- 8:25:52not at all. And by all means, do not
- 8:25:55assume. What is an assumption? Something
- 8:25:58we believe to be true but have not
- 8:26:00validated. Assumptions become risks.
- 8:26:02Risks become issues. And issues become
- 8:26:05project killers. You may think
- 8:26:07everything is fine, and that's good. But
- 8:26:10before you move forward, make sure that
- 8:26:12you get with somebody and you validate
- 8:26:14the fact that everything quote unquote
- 8:26:17is fine.
- 8:26:19>> And in order to overcome these
- 8:26:21challenges, well, first it's always
- 8:26:22really important to understand the full
- 8:26:24scope of the project before you even
- 8:26:26begin. And your failure to do so will
- 8:26:28result in your ultimate failure. And at
- 8:26:31the onset of a project, you want to
- 8:26:33really make sure you understand every
- 8:26:35detail of it. So that means and I like
- 8:26:38to start from um understanding what the
- 8:26:40end goal is. So if there's a specific
- 8:26:42launch date then it's really important
- 8:26:44to make sure that you understand what
- 8:26:46that launch date is, what the budget is
- 8:26:49and then when you move on to resourcing
- 8:26:51know what resources are required to get
- 8:26:54through every piece of that project and
- 8:26:57make sure you have those resources
- 8:26:59actually available that people have the
- 8:27:01capacity to fulfill the needs of the
- 8:27:03project. And lastly, leadership. Um,
- 8:27:06it's always important to, and I think
- 8:27:08that can come from um different levels
- 8:27:12of an organization. If you have
- 8:27:14leadership above you, it's important to
- 8:27:17make sure that you have the guidance
- 8:27:18necessary for you. But if it comes down
- 8:27:21to yourself, that you are making sure
- 8:27:23you're accountable for your deliverables
- 8:27:25and also checking in on the different
- 8:27:28parts of your team to make sure that
- 8:27:30everything is on track. At the start of
- 8:27:33a project, it's good to recommend a
- 8:27:35communication cadence and format to your
- 8:27:37client and get their feedback on it. You
- 8:27:40want to make sure that it's customized
- 8:27:42to their needs because they are likely
- 8:27:44circulating that information up to their
- 8:27:46leadership and they're going to get
- 8:27:48evaluated on that report. Then always,
- 8:27:51always, always uh stick to the same
- 8:27:53predictable cadence and format every
- 8:27:55time. You're likely going to come across
- 8:27:57surprises and challenges in your
- 8:27:59project, but consistent communication
- 8:28:01should never be one of them because that
- 8:28:03is in your control. Your clients will
- 8:28:06feel more at ease and want to work with
- 8:28:08you again if you show this commitment to
- 8:28:10predictable behaviors.
- 8:28:14[Music]
- 8:28:22Hello and welcome to communications
- 8:28:24basics. After watching this video, you
- 8:28:27will be able to summarize the
- 8:28:30communications model, define technology
- 8:28:32factors that can impact effective
- 8:28:34communications, and define various
- 8:28:37communications methods. Now, the
- 8:28:40communications model illustrates the
- 8:28:42complexity of achieving effective
- 8:28:44communications. It is essential that the
- 8:28:46project manager understands the
- 8:28:48communications model in order to reduce
- 8:28:51the risk of poor or inadequate
- 8:28:53communications that can lead to project
- 8:28:55failure. Let's look at four lessons we
- 8:28:58can learn from the communications model.
- 8:29:00Lesson one is to encode each message so
- 8:29:03the receiver can understand it. The
- 8:29:06project manager should ensure that the
- 8:29:08message sent is the message received.
- 8:29:10And this requires both audience analysis
- 8:29:13and an understanding of how the receiver
- 8:29:15prefers to communicate. Lesson two is to
- 8:29:18select the correct medium. Some people
- 8:29:20prefer to communicate with email while
- 8:29:23others prefer texts and some
- 8:29:25stakeholders may not even respond unless
- 8:29:28you meet face to face. Lesson three is
- 8:29:31to ensure that all communications have a
- 8:29:33purpose. The project manager should
- 8:29:36ensure ahead of time what type of
- 8:29:38feedback they require and adjust the
- 8:29:40message as needed. And if no feedback is
- 8:29:43necessary, the project manager may
- 8:29:46re-evaluate the purpose of the
- 8:29:48communications.
- 8:29:49And finally, lesson four is to be aware
- 8:29:52of communication blockers. This is the
- 8:29:55project manager's greatest communication
- 8:29:57challenge. The project manager should
- 8:30:00identify blockers and plan to overcome
- 8:30:03them. Some examples of blockers include
- 8:30:06culture, language, or the individual's
- 8:30:08readiness to receive the communication.
- 8:30:11The Project Management Institute or PMI
- 8:30:15identifies technology factors that can
- 8:30:17jeopardize effective communications.
- 8:30:20First, how urgent is the need to share
- 8:30:22information? Project managers should try
- 8:30:25to avoid the priority one syndrome and
- 8:30:28instead focus on sending the right
- 8:30:30information at the right time in the
- 8:30:33right amount to the right person. Every
- 8:30:35message does not need to be urgent.
- 8:30:38Second, the availability and reliability
- 8:30:41of the technology are important. For
- 8:30:44example, if the project team uses
- 8:30:46Microsoft SharePoint, the project
- 8:30:48manager should ensure that all key
- 8:30:50stakeholders have access to this
- 8:30:52software and understand how to use it.
- 8:30:56Third, the project environment plays a
- 8:30:58big part in effective communications.
- 8:31:01The project manager should consider how
- 8:31:03the project team will accomplish
- 8:31:05communications. Face-to-face
- 8:31:07communications are the most effective.
- 8:31:10However, the team may be dispersed in
- 8:31:12different time zones. In this case,
- 8:31:15virtual communications may be the only
- 8:31:17option. And finally, project managers
- 8:31:20should understand sensitivity and
- 8:31:23confidentiality considerations by
- 8:31:25safeguarding communications and ensuring
- 8:31:28the right audience is targeted. Now the
- 8:31:31PMI identifies three primary
- 8:31:34communications methods that project
- 8:31:36managers should consider and each method
- 8:31:39requires communications planning and a
- 8:31:41situational approach. The first primary
- 8:31:44communications method is interactive
- 8:31:47communication. Interactive communication
- 8:31:50occurs between two parties and can be
- 8:31:53very challenging. The project manager
- 8:31:56needs to understand the other
- 8:31:57individual's perspective. preferred
- 8:31:59communication style, level of knowledge,
- 8:32:02attitude and more. The second method is
- 8:32:06push communications. In this method, the
- 8:32:09project manager sends communications to
- 8:32:11one or multiple parties without
- 8:32:13receiving any acknowledgement that the
- 8:32:15communications were read or understood.
- 8:32:18The manager should use this type of
- 8:32:20communication only after reaching a
- 8:32:22consensus with stakeholders that they
- 8:32:25understand the purpose of the
- 8:32:26communication and commit to the process.
- 8:32:30And finally, the last primary
- 8:32:32communication method is pull
- 8:32:33communications. Here the project manager
- 8:32:37needs to determine and plan for
- 8:32:39stakeholder communications access needs.
- 8:32:42Pull communications involve access to
- 8:32:44information by stakeholders on an
- 8:32:47ondemand basis.
- 8:32:49In this video, you learned that the
- 8:32:52communications model illustrates four
- 8:32:54lessons the project manager should
- 8:32:56understand to avoid project failure.
- 8:32:59Encoding communications, using the
- 8:33:01correct medium, having a purpose, and
- 8:33:04being aware of blockers. The PMI
- 8:33:07identifies four technology factors that
- 8:33:10can impact effective communications,
- 8:33:12including urgency, availability, and
- 8:33:15reliability, environment, and
- 8:33:17sensitivity, and confidentiality.
- 8:33:20And the three primary communications
- 8:33:22methods managers should consider using
- 8:33:25are interactive, push, and pull
- 8:33:27communications.
- 8:33:32[Music]
- 8:33:40Welcome to communications planning.
- 8:33:43After watching this video, you will be
- 8:33:45able to identify the importance of
- 8:33:48effective communications in a project,
- 8:33:51describe a three-step approach to
- 8:33:53managing communications, examine
- 8:33:55communications management planning
- 8:33:57techniques, and identify key
- 8:33:59communications activities for project
- 8:34:02success.
- 8:34:03Effective communications can make or
- 8:34:06break a project. The greater the
- 8:34:08communications effectiveness, the higher
- 8:34:10the potential for project success. Let's
- 8:34:13look at the project manager
- 8:34:15communication responsibilities
- 8:34:17throughout the project management
- 8:34:18institutes or PMI life cycle. First,
- 8:34:22project managers should ensure that all
- 8:34:24stakeholders understand the life cycle
- 8:34:27they will use in the project. Then
- 8:34:29managers should communicate the location
- 8:34:32of all critical documents and ensure the
- 8:34:34team and stakeholders can access them.
- 8:34:37Managers should also provide an
- 8:34:39understanding of project roles,
- 8:34:41responsibilities, and collaboration
- 8:34:44strategies. Project managers are
- 8:34:46responsible for conducting problemolving
- 8:34:49and decision-making communications when
- 8:34:51needed. In addition, managers should
- 8:34:54communicate essential tasks to the team
- 8:34:56and explain the purpose and value the
- 8:34:59project deliverables provide to the
- 8:35:01organization. Finally, the project
- 8:35:04manager should ensure all stakeholders
- 8:35:06understand the current project status
- 8:35:08and next steps. It is important to note
- 8:35:12that the PMI states the communications
- 8:35:14impact 90% of a project manager's job
- 8:35:18and if they fail to communicate
- 8:35:20effectively, the project may fail. The
- 8:35:23PMI has a simple but effective
- 8:35:25three-step process to manage project
- 8:35:28communications and this process follows
- 8:35:30the plan do check act or PDCA
- 8:35:34methodology. The first step in this
- 8:35:37process is to plan communications. Here
- 8:35:40the project manager develops a
- 8:35:42communications management plan which
- 8:35:44defines crucial activities, assigns
- 8:35:46leads, determines audiences, documents
- 8:35:49media and timing and describes the
- 8:35:52purpose of the communications items. The
- 8:35:55next step is to manage communications.
- 8:35:58Once the project sponsor approves the
- 8:36:00communications management plan, the
- 8:36:03manager can then implement the plan and
- 8:36:05the team can communicate in accordance
- 8:36:07with the plan.
- 8:36:09Now the third step in this PDCA
- 8:36:11methodology is to monitor
- 8:36:14communications. In this final step, the
- 8:36:17team monitors and adjusts communication
- 8:36:19methods as needed. The project manager
- 8:36:22monitors and resolves issues and updates
- 8:36:25the communications management plan as
- 8:36:27the project progresses and they also
- 8:36:30assess work performance information and
- 8:36:32share it in a work performance report.
- 8:36:35The communications management plan
- 8:36:37provides a road map and a rhythm to
- 8:36:40communication. Let's examine the
- 8:36:42nine-step process to develop and approve
- 8:36:45a communications management plan. In the
- 8:36:48first step, the project manager
- 8:36:50determines if the organization uses a
- 8:36:52standard communications management plan
- 8:36:55template. If so, the manager uses the
- 8:36:58template. In step two, the manager and
- 8:37:01team brainstorm the project. And since
- 8:37:04every project is different, the group
- 8:37:06should determine the essential
- 8:37:07communications they must execute to
- 8:37:10ensure success. For step three, the
- 8:37:13project manager must determine who is
- 8:37:15included in communications. A best
- 8:37:18practice is for the manager to review
- 8:37:20the project's stakeholder register as a
- 8:37:23starting point. And in almost all cases,
- 8:37:26someone on this register has a role that
- 8:37:29requires communications.
- 8:37:31In step four of developing a
- 8:37:33communications management plan, the
- 8:37:35manager documents and defines the
- 8:37:37purpose of each communications item and
- 8:37:40its audience. In step five, the project
- 8:37:43manager determines the best team member
- 8:37:46to manage the communications item. After
- 8:37:49confirming the roles and
- 8:37:50responsibilities of the item lead with
- 8:37:52the team member, the manager adds the
- 8:37:55assignment details to the plan. Step six
- 8:37:58requires the project manager to analyze
- 8:38:01the audience to determine the most
- 8:38:03appropriate communications medium and
- 8:38:05enter this description into the plan.
- 8:38:08Options of communications mediums
- 8:38:10include email, messenger, virtual or
- 8:38:13face-to-face meetings. For step seven,
- 8:38:16the project manager determines the ideal
- 8:38:19frequency for each communications item
- 8:38:22and completes the frequency section of
- 8:38:24the plan. In step eight, the manager
- 8:38:27shares a copy of the initial plan with
- 8:38:29all potential recipients, confirming
- 8:38:32that they agree and support the
- 8:38:34communications items that impact them.
- 8:38:36And finally, in step nine, the project
- 8:38:39manager shares the communications
- 8:38:41management plan and ensures version
- 8:38:43control on past documents as the plan
- 8:38:46will require updates throughout the
- 8:38:48project. So while every project is
- 8:38:52different, there are common activities
- 8:38:54that the project manager should document
- 8:38:56in the communications management plan.
- 8:38:59Let's look at some examples. Managers
- 8:39:02post status reports and identify when
- 8:39:04and where the project team will hold
- 8:39:07meetings. The sponsor and manager
- 8:39:09discuss the project status and issues in
- 8:39:12periodic sponsor one-on- ons. An
- 8:39:16essential activity of building a team is
- 8:39:18team meetings. The project manager must
- 8:39:21plan meetings to ensure this interaction
- 8:39:24happens. Vendor and change management
- 8:39:26communications are essential to ensure
- 8:39:29how project managers will accomplish
- 8:39:31vendor management and how they will
- 8:39:34review and approve change requests. For
- 8:39:37larger projects, the team needs to meet
- 8:39:39periodically to perform risk
- 8:39:41reassessments, monitor risks, and share
- 8:39:44issues that occur and the plans to
- 8:39:47resolve them. Some projects require
- 8:39:49specific meetings to discuss financial
- 8:39:52status and resource needs. And finally,
- 8:39:56resource requirements may change for a
- 8:39:58variety of reasons. So, it's important
- 8:40:00that the team periodically meets and
- 8:40:03validates the resource plan to address
- 8:40:05shortages and overallocations.
- 8:40:09In this video, you learned that the
- 8:40:11project manager's communications
- 8:40:13responsibilities throughout the PMI life
- 8:40:16cycle include ensuring stakeholder
- 8:40:18understanding of the project life cycle,
- 8:40:21communicating documents to the team,
- 8:40:23conducting problem solving and
- 8:40:25decision-making communications and
- 8:40:28confirming stakeholder understanding of
- 8:40:30the next steps. Communications impact
- 8:40:3490% of a project manager's job. The PMI
- 8:40:38three-step process to manage project
- 8:40:40communications is planning, managing,
- 8:40:43and monitoring communications.
- 8:40:46There are nine steps a project manager
- 8:40:48should follow to develop and approve a
- 8:40:51communications management plan. And
- 8:40:53despite differences in projects, there
- 8:40:56are common activities that the project
- 8:40:58manager should always document in the
- 8:41:00communications management plan.
- 8:41:05[Music]
- 8:41:12Welcome to expert viewpoints
- 8:41:14communications planning. In this video,
- 8:41:17we will hear from project managers
- 8:41:19discussing how to effectively
- 8:41:20communicate.
- 8:41:23>> I'm going to talk about two key
- 8:41:25documents. One of them is the
- 8:41:27stakeholder register. A stakeholder
- 8:41:29register is a list of key stakeholders
- 8:41:32that the project manager and the team
- 8:41:34should develop very early in the
- 8:41:36project. You identify all stakeholders
- 8:41:38early. You assign roles and
- 8:41:40responsibilities. And the key to this
- 8:41:43document is to gain their commitment to
- 8:41:45support the project. The second aspect
- 8:41:48or document that I want to go ahead and
- 8:41:50talk to is what we refer to as a
- 8:41:52communications management plan. Once we
- 8:41:55get into the planning
- 8:41:57phase, what we're going to do is we're
- 8:42:00going to take a look at that stakeholder
- 8:42:02register and we're going to determine
- 8:42:03who needs to be communicated with. In
- 8:42:06the communications management plan, we
- 8:42:08define a number of things. Number one,
- 8:42:10what do we want to communicate? Number
- 8:42:12two, to whom are we going to
- 8:42:13communicate? Number three, when are we
- 8:42:15going to communicate? Number four, how
- 8:42:17are we going to communicate? And very
- 8:42:20importantly, number five, why are we
- 8:42:22going to communicate
- 8:42:24this particular information to these
- 8:42:26stakeholders? As a rule, anyone who's on
- 8:42:29the stakeholder register should show up
- 8:42:31in the communications management plan.
- 8:42:33If they're important enough to have a
- 8:42:35role and responsibility, they're
- 8:42:37important enough to be able to receive
- 8:42:39information.
- 8:42:41To plan to effectively communicate with
- 8:42:43key stakeholders in a project, it's
- 8:42:46important to establish what cadence you
- 8:42:48want to use first. So, for example, at
- 8:42:52the onset of a project, I like to
- 8:42:53establish whether or not we'll be
- 8:42:55checking in weekly or bi-weekly or if
- 8:42:59they need a larger check-in at any
- 8:43:01period of the month. basically establish
- 8:43:03what cadence you want to be able to have
- 8:43:06and then how how ingrained in the
- 8:43:08details um other stakeholders want to
- 8:43:10be.
- 8:43:12At the start of any project, I always
- 8:43:14create a communication plan detailing
- 8:43:17key stakeholders, their role, and how
- 8:43:19and when they're being communicated to.
- 8:43:22And the time and the effort I spend on
- 8:43:23this always matches the size of the
- 8:43:25project and the needs and the
- 8:43:26expectations of the stakeholders. So for
- 8:43:29example, maybe a small project might
- 8:43:32require just a quick table and a
- 8:43:34PowerPoint slide as the communication
- 8:43:36plan. But for a big project like a
- 8:43:39product launch moment, it might require
- 8:43:41a racy chart in Excel or in PM software.
- 8:43:45And that might need formal interviews um
- 8:43:48conducted across multiple stakeholder
- 8:43:50groups to really understand how your
- 8:43:52project reports are being socialized and
- 8:43:54who depends on them.
- 8:43:58Setting up a communication plan for a
- 8:44:00project um is a little can be a little
- 8:44:02tricky because each project may demand a
- 8:44:05certain set of communication tools and
- 8:44:07for each project you're working with a
- 8:44:09different set of stakeholders and a
- 8:44:11different set of people that are
- 8:44:13actually doing the work. So, you know,
- 8:44:15this is really about um you know,
- 8:44:16stakeholder communicate uh communication
- 8:44:19um and really understanding who your
- 8:44:22stakeholders are is going to be a an
- 8:44:24important factor in figuring out how
- 8:44:26best to communicate.
- 8:44:28>> Once again, I'm going to point you to
- 8:44:30the stakeholder register and
- 8:44:31communications plan. But more than just
- 8:44:34developing them, you want to go ahead
- 8:44:36and have the meeting before the meeting.
- 8:44:38Pre-coordinate these. Make sure that
- 8:44:40anyone who's on the stakeholder register
- 8:44:42with a role and responsibility or anyone
- 8:44:45who is in the communications management
- 8:44:47plan realizes that they have a role to
- 8:44:49play and there are certain aspects of
- 8:44:51communications that they have to be
- 8:44:53aware of as well. Have that standard
- 8:44:56stakeholder register communications
- 8:44:58management plan and make sure that they
- 8:45:01are available and accessible to all of
- 8:45:04the different stakeholders as well. In
- 8:45:06addition, I'm going to introduce a new
- 8:45:08acronym to you, MBWAT.
- 8:45:12I learned this a long time ago. It
- 8:45:13stands for management by walking and
- 8:45:16talking. And while MBWAT, management by
- 8:45:19walking and talking, may not necessarily
- 8:45:21be a tool. It is a very very strong
- 8:45:24technique. You can have multiple issues
- 8:45:27impact you in a project. And if you do
- 8:45:30not get out and see the people, visit
- 8:45:33the stakeholders, build those
- 8:45:34relationships, those issues may catch
- 8:45:38you by surprise. In addition, some
- 8:45:40project managers will try to manage
- 8:45:42issues via email. Don't get me wrong,
- 8:45:45email is a great methodology. However,
- 8:45:48you can accomplish more in one
- 8:45:50face-to-face meeting than you probably
- 8:45:52can through a number of different emails
- 8:45:54as well.
- 8:45:56>> I have used different types of software.
- 8:45:59I have used ASA, I have used Smart
- 8:46:02Sheets, I have in some instances used
- 8:46:04Jira, but ultimately you'll want to find
- 8:46:06the software that makes sense for you.
- 8:46:09My preference for those types of
- 8:46:10software is that it's really easy to
- 8:46:12have different watchers on specific
- 8:46:15types of a project. So, you can tag
- 8:46:18certain stakeholders, you can create
- 8:46:20reports, you can um create tickets and
- 8:46:24resolve them from there. So, those are
- 8:46:27some tools that I like. It's really
- 8:46:28important to research and take a look at
- 8:46:30tools that you'd want to use for your
- 8:46:32own project as well.
- 8:46:35It's hard to recommend a specific tool
- 8:46:37or technique for stakeholder
- 8:46:38communication because clients and their
- 8:46:40needs are always going to be so
- 8:46:41different depending on the project and
- 8:46:44the company. So, the best advice that I
- 8:46:46can give is just to be comfortable with
- 8:46:48a wide range of PM tools so you can
- 8:46:50adapt to what's needed. For example, I'm
- 8:46:53a visual person. I love PowerPoint
- 8:46:56decks, but I know that some clients only
- 8:46:58want to see numbers in a PowerBI report,
- 8:47:00and so I cater to their needs. It's
- 8:47:03critical to interview clients at the
- 8:47:05start of a project to understand what
- 8:47:07their specific style is. What do they
- 8:47:09want to see? What has worked well for
- 8:47:11them in the past and why?
- 8:47:15[Music]
- 8:47:22Welcome to manage communications part
- 8:47:25one. After watching this video, you will
- 8:47:28be able to describe key communication
- 8:47:31methods and identify key communication
- 8:47:34challenges.
- 8:47:35So managing communications occurs after
- 8:47:38the communications management plan has
- 8:47:41been approved. Note the communication
- 8:47:43plan is discussed in another video.
- 8:47:46Communication activities must be
- 8:47:48effective as the project moves into the
- 8:47:51execution phase.
- 8:47:52Now there are different communication
- 8:47:54methods a project manager might need to
- 8:47:57use on a project. These include
- 8:47:59interpersonal communication, small
- 8:48:02groupoup communication, and large or
- 8:48:04public group communication. A project
- 8:48:07manager is responsible for selecting
- 8:48:09methods that meet the needs of the
- 8:48:11project and stakeholders. Let's look at
- 8:48:14some tips to make these methods
- 8:48:15effective. Interpersonal communication
- 8:48:18is necessary and is an exchange between
- 8:48:21two individuals. It is critical to
- 8:48:24understand various communication styles
- 8:48:27and the needs of all members of the
- 8:48:29project team to ensure communications
- 8:48:31are satisfactory and yield results. Some
- 8:48:35stakeholders are analytical and want to
- 8:48:37get to the point. Others are structural
- 8:48:40and want to be organized. Some may be
- 8:48:43social and go with the motto, let's work
- 8:48:45together. And some others may be
- 8:48:47conceptual and say, "Let's explore the
- 8:48:50opportunities."
- 8:48:52Small group communication is also a
- 8:48:54common method to share information. And
- 8:48:57in a small group communication, the
- 8:48:59project manager determines who needs to
- 8:49:02be in a meeting or on a chat, invites
- 8:49:04only those who need to be at the
- 8:49:06meeting, shares an agenda, sets clear
- 8:49:09goals and objectives, and shares minutes
- 8:49:12and action items when the meeting is
- 8:49:14complete. Finally, a project manager may
- 8:49:18need to communicate with a large group
- 8:49:20or publicly. Here, careful preparation
- 8:49:23is essential. The project manager must
- 8:49:26ensure the communication portrays
- 8:49:28information that was reviewed and serves
- 8:49:31the needs of the organization. Methods
- 8:49:34that work for some stakeholders may not
- 8:49:36work for others. They must understand
- 8:49:39the audience, understand their
- 8:49:41information needs, and plan
- 8:49:43communications accordingly.
- 8:49:45So, we've reviewed different
- 8:49:47communication methods. Now, let's
- 8:49:49discuss a few types of communication
- 8:49:51mediums. The medium types include
- 8:49:54face-to-face conversations, instant
- 8:49:56messaging, emails, and video calls.
- 8:50:00Select the medium that best meets the
- 8:50:02needs of stakeholders. For example, if
- 8:50:05team members work remotely, face-toface
- 8:50:07is not the best option. Select a call or
- 8:50:10video conference. And you also need to
- 8:50:13decide if the meeting is impromptu or
- 8:50:16scheduled. Remember, a method or medium
- 8:50:19that works for some stakeholders may not
- 8:50:21work for others. Share the right
- 8:50:24information with the right people using
- 8:50:26an appropriate medium. Understand the
- 8:50:29audience. Understand their information
- 8:50:31needs and plan your communications
- 8:50:34accordingly. A one-sizefits-all
- 8:50:36communication methodology will not
- 8:50:39always yield positive results. So while
- 8:50:42communication must be effective, it is
- 8:50:45arguably a difficult interpersonal skill
- 8:50:47to perfect, anticipate communication
- 8:50:50challenges as the project progresses.
- 8:50:53The most common challenges include
- 8:50:55insufficient competence in
- 8:50:57communication, inability to comprehend
- 8:51:00communication styles and nonverbal
- 8:51:02communication, dealing with commitment
- 8:51:05issues, and providing feedback to team
- 8:51:08members. Communication competence
- 8:51:10includes tailoring communication,
- 8:51:13ensuring the purpose of communications
- 8:51:15is clear, building effective
- 8:51:17relationships to enhance communications
- 8:51:20success, and displaying proper
- 8:51:22leadership behavior to support
- 8:51:24communications. Strive to improve your
- 8:51:27communication competence whenever
- 8:51:29possible. Now, since different
- 8:51:31stakeholders have different
- 8:51:33communication styles, the PMI recommends
- 8:51:36that all project managers consider
- 8:51:38completing an assessment of their
- 8:51:40communication style and be aware of the
- 8:51:43styles of others. Also, be aware that
- 8:51:46messages are not simply covered with
- 8:51:49words. A project manager also
- 8:51:51communicates non-verbbally through
- 8:51:54expressions, gestures, and tone of
- 8:51:56voice. Ensure you are aware of your
- 8:51:59non-verbal mannerisms and take the next
- 8:52:02step to self-manage them. Now, the high
- 8:52:05level of excitement present when a
- 8:52:07project is initiated often decreases
- 8:52:10over time. A project manager must detect
- 8:52:13when the team's commitment levels drop
- 8:52:15and take action to motivate the impacted
- 8:52:18stakeholders and team. And a project
- 8:52:21manager also needs to hold stakeholders
- 8:52:24accountable for commitments to achieve
- 8:52:26project goals. Now, a project manager
- 8:52:29should provide feedback to the team.
- 8:52:32Feedback mitigates the risk of poor
- 8:52:34performance and accentuates and rewards
- 8:52:37the positive. When feedback is not
- 8:52:40provided, team members assume they are
- 8:52:42performing adequately when perhaps
- 8:52:45performance is lacking. Remember to
- 8:52:47provide positive feedback. Positive
- 8:52:50feedback reinforces good behaviors and
- 8:52:52skills and is a great tool for
- 8:52:55motivating team members.
- 8:52:58In this video, you learned that managing
- 8:53:00communications occurs after the
- 8:53:03communications management plan is
- 8:53:04approved. Three types of communication
- 8:53:07methods include interpersonal, small
- 8:53:10groupoup, and large group communication.
- 8:53:13And five key communication challenges
- 8:53:15include communication competence,
- 8:53:18communication style comprehension,
- 8:53:20nonverbal communication comprehension,
- 8:53:23commitment management, and providing
- 8:53:25feedback.
- 8:53:29[Music]
- 8:53:36[Music]
- 8:53:39Welcome to manage communications part
- 8:53:42two. After watching this video, you will
- 8:53:45be able to explain key communication
- 8:53:48skills essential to succeed. So there
- 8:53:51are various interpersonal and team
- 8:53:54skills that are essential to improve
- 8:53:56communication as shared by PMI. These
- 8:53:59include conducting effective meetings,
- 8:54:02active listening, conflict management,
- 8:54:06networking, and cultural and political
- 8:54:09awareness.
- 8:54:11Now, meetings are a constant for a
- 8:54:13project manager, and numerous studies
- 8:54:15cited meetings as a huge time waster in
- 8:54:18the opinion of managers. Project
- 8:54:20managers must learn how to mitigate this
- 8:54:23risk. Ensure meetings are well planned,
- 8:54:26have an agenda with a well-defined
- 8:54:28outcome, and are conducted in an
- 8:54:30organized and efficient manner. Only
- 8:54:33have meetings when necessary, and ensure
- 8:54:36the right people are invited and
- 8:54:38available. Active listening is another
- 8:54:41key to your success. Techniques that
- 8:54:43help with active listening include
- 8:54:45acknowledging the conversation,
- 8:54:47clarifying, and confirming that you
- 8:54:50understand. Paraphrasing is also a great
- 8:54:53tool to show understanding. Perfecting
- 8:54:55your active listening skills will
- 8:54:57improve the quality of communication,
- 8:55:00enhance your relationships, and garner
- 8:55:02additional levels of respect. So,
- 8:55:05conflict occurs when two or more parties
- 8:55:08have differing opinions or ideas.
- 8:55:11Conflict can be categorized as
- 8:55:13functional or dysfunctional. Functional
- 8:55:16conflict occurs when there are
- 8:55:17conflicting ideas that when discussed
- 8:55:20lead to a better solution. Dysfunctional
- 8:55:23conflict occurs when conflicting ideas
- 8:55:25lead to anger, frustration, and lost
- 8:55:28time. Now, conflict will occur. So, a
- 8:55:32project manager must establish a safe
- 8:55:34environment where all stakeholders feel
- 8:55:36free to share ideas in a constructive
- 8:55:39manner.
- 8:55:40Effective networking provides access to
- 8:55:43multiple information sources such as
- 8:55:46establishing cross team collaboration
- 8:55:48and garnering expertise in the
- 8:55:50organization from outside the project
- 8:55:53team. Networking helps solve problems
- 8:55:55and influence stakeholder support.
- 8:55:58Lastly, understanding the differences
- 8:56:01between individuals, groups, and
- 8:56:03organizations is critical. In addition,
- 8:56:06recognition of the project environment
- 8:56:08and power dynamics, both formal and
- 8:56:11informal, can impact success.
- 8:56:14In this video, you learned that the five
- 8:56:17key interpersonal and team skills
- 8:56:20essential to effective communications as
- 8:56:22shared by PMI are conducting effective
- 8:56:25meetings, active listening, conflict
- 8:56:28management, networking, and cultural and
- 8:56:31political awareness.
- 8:56:35[Music]
- 8:56:43Welcome to manage communications tools
- 8:56:46and techniques. After watching this
- 8:56:49video, you will be able to summarize
- 8:56:52active listening, explain the importance
- 8:56:54of effective conflict management, and
- 8:56:57explain the concept of cultural and
- 8:56:59political awareness when sharing
- 8:57:01information.
- 8:57:03Now, active listening is a critical
- 8:57:05skill essential to effective
- 8:57:07communication. So, let's look at seven
- 8:57:09steps that summarize active listening.
- 8:57:12And this is also a great guide to
- 8:57:14improve active listening skills. Being
- 8:57:17attentive. The project manager should
- 8:57:19give the other party their full
- 8:57:21undivided attention. Asking open-ended
- 8:57:24questions. Active listening enables the
- 8:57:27project manager to learn about various
- 8:57:29subjects in depth. Asking probing
- 8:57:32questions, understanding the basic
- 8:57:34premise of the conversation, and asking
- 8:57:36follow-up questions ensures effective
- 8:57:39communication. Requesting clarification.
- 8:57:42The project manager should ensure that
- 8:57:44the message sent was the message
- 8:57:46received. Paraphrasing by repeating what
- 8:57:50they understood, the project manager can
- 8:57:52ensure everyone is on the same page.
- 8:57:56Being attuned to and reflecting
- 8:57:58feelings. Project managers should watch
- 8:58:01the non-verbal cues, listen to voice
- 8:58:03tone, and reflect passion where
- 8:58:06appropriate. And finally, summarizing.
- 8:58:09Project managers reflect on the
- 8:58:11conversation and ensure mutual
- 8:58:14understanding of the next steps
- 8:58:15discussed.
- 8:58:17Now, conflicts will happen and may be
- 8:58:19caused by resource availability,
- 8:58:22scheduling, budget, priorities, personal
- 8:58:25work styles, personalities, and more.
- 8:58:28Proactively recognizing and dealing with
- 8:58:30conflict can lead to greater
- 8:58:32productivity and fewer issues. And
- 8:58:35conflict can be both functional and
- 8:58:38dysfunctional. Ways to reduce the risk
- 8:58:40of dysfunctional conflict and encourage
- 8:58:43functional conflict include setting
- 8:58:46ground rules and norms, having a solid
- 8:58:49and agreed upon communications
- 8:58:51management plan, having well-defined
- 8:58:53roles and responsibilities, and having
- 8:58:56productive team meetings.
- 8:58:59The Project Management Institute or PMI
- 8:59:02states five potential techniques for
- 8:59:04resolving conflict. Collaborate, problem
- 8:59:07solve. With this favored conflict
- 8:59:10method, also known as win-win, project
- 8:59:13managers incorporate multiple
- 8:59:15viewpoints, show a cooperative attitude,
- 8:59:18and strive for consensus and commitment.
- 8:59:21Compromise reconcile. This technique is
- 8:59:24not preferred, but is often necessary
- 8:59:26when the collaborate problem solve
- 8:59:28technique is not possible. also known as
- 8:59:31lose-lose. Each party receives something
- 8:59:34with this technique but must also give
- 8:59:36up something in return. Then we have
- 8:59:40force direct also known as win-lose. In
- 8:59:43this technique, one viewpoint is pushed
- 8:59:45at the expense of another so that the
- 8:59:47second party may not have a say in the
- 8:59:50matter and this method is preferred
- 8:59:52during emergencies but should not be the
- 8:59:54default conflict management mode.
- 8:59:57Withdraw avoid. Now, this method is not
- 9:00:00preferred long-term as it involves
- 9:00:02retreating or postponing a decision
- 9:00:05though this can sometimes be positive as
- 9:00:08it can reduce emotions and allow for
- 9:00:10better preparation to move forward. And
- 9:00:13finally, we have smooth accommodate. The
- 9:00:16areas of agreement are emphasized rather
- 9:00:19than the differences. Needs are
- 9:00:21postponed to maintain harmony and
- 9:00:23relationships. And while this technique
- 9:00:26may be effective in certain situations,
- 9:00:28it is not long-term.
- 9:00:31Project managers should adapt
- 9:00:33communications to accommodate
- 9:00:35individual, group, and organizational
- 9:00:37differences and minimize understandings
- 9:00:40and miscommunication.
- 9:00:42The benefits of improving cultural
- 9:00:44awareness include increasing
- 9:00:47communication, increasing respect and
- 9:00:49understanding of the advantages a
- 9:00:51diverse culture can provide, enhancing
- 9:00:54the ability to lead effectively,
- 9:00:56improving the workspace environment, and
- 9:00:59ensuring successful globalization.
- 9:01:02Now a project manager can potentially
- 9:01:04possess many forms of power and some
- 9:01:07powers are based on position while other
- 9:01:10powers must be earned. This PMI area of
- 9:01:14focus includes five powers. Formal
- 9:01:17authority or position power is based on
- 9:01:19the position. A project manager has
- 9:01:22authority over the project charter to
- 9:01:24plan and execute the project and may
- 9:01:27request resources for project planning.
- 9:01:30Reward power is the project manager's
- 9:01:33ability to gain support from the team
- 9:01:35and stakeholders due to the project
- 9:01:38manager's ability to provide salary
- 9:01:40promotions or future work assignments.
- 9:01:44Penalty power is the project manager's
- 9:01:46ability to take punitive action when
- 9:01:48team members or stakeholders do not
- 9:01:51perform satisfactorily and this power
- 9:01:54should be used sparingly and with
- 9:01:56caution. The project manager gains
- 9:01:59expert power when the team and
- 9:02:01stakeholders perceive the project
- 9:02:03manager as knowledgeable. The team must
- 9:02:06perceive this knowledge as functional
- 9:02:08expertise that they consider essential.
- 9:02:12Project managers must earn expert power.
- 9:02:15And finally, reference power is the
- 9:02:18ability of the project manager to gain
- 9:02:20support because the team and
- 9:02:22stakeholders feel personally attracted
- 9:02:24to the project manager or the project.
- 9:02:28In this video, you learned that active
- 9:02:30listening is a skill essential to
- 9:02:32effective communication. Project
- 9:02:35managers can reduce dysfunctional
- 9:02:37conflict and encourage functional
- 9:02:39conflict. The five techniques the PMI
- 9:02:42recognizes for resolving conflict are
- 9:02:45collaborate, problem solve, compromise,
- 9:02:48reconcile, force, direct, withdraw,
- 9:02:50avoid, and smooth accommodate. Project
- 9:02:54managers should be culturally and
- 9:02:56politically aware and project managers
- 9:02:59can possess powers. And we reviewed five
- 9:03:02powers the PMI emphasizes.
- 9:03:07[Music]
- 9:03:16Welcome to monitor communications.
- 9:03:19After watching this video, you will be
- 9:03:21able to summarize communications
- 9:03:24monitoring responsibilities, summarize
- 9:03:26effective meeting management techniques,
- 9:03:29describe best practices in virtual
- 9:03:31communications, and identify how the
- 9:03:34project management institute or PMI code
- 9:03:37of ethics impacts effective
- 9:03:39communications.
- 9:03:41Communication requirements change as a
- 9:03:43project progresses. The project manager
- 9:03:46has several responsibilities to maintain
- 9:03:48good communication practices throughout
- 9:03:50the project. We will look at seven of
- 9:03:52these responsibilities.
- 9:03:54The first three are continuing to
- 9:03:57monitor work performance information
- 9:03:59impacting the project and communicating
- 9:04:01important information out, ensuring
- 9:04:04stakeholders follow the integrated
- 9:04:06change control process as all changes
- 9:04:09must be approved before implementation
- 9:04:11to avoid scope creep and keeping the
- 9:04:14communications management plan up to
- 9:04:16date and ensuring version control is
- 9:04:19maintained.
- 9:04:21Let's now look at the last four project
- 9:04:23management communication
- 9:04:24responsibilities.
- 9:04:26Updating the stakeholder register,
- 9:04:28especially if new stakeholders are
- 9:04:30identified to support the project.
- 9:04:32Stakeholders whose support is no longer
- 9:04:34needed should be thanked and removed
- 9:04:36from the plan. Managing and updating the
- 9:04:39issue log and proactively addressing
- 9:04:41issues. Issues may be project or
- 9:04:44personnel related and include blockers,
- 9:04:47stakeholder questions or problems that
- 9:04:50need a solution. Continuing to develop
- 9:04:52and manage the team with meetings and
- 9:04:55discussions. While email is convenient,
- 9:04:58it should not be the primary
- 9:04:59communications method. Face-to-face
- 9:05:02communication is preferred. And lastly,
- 9:05:05conveying the importance of conducting
- 9:05:07and documenting lessons learned to
- 9:05:10assist future projects. communicating
- 9:05:12successes and disappointments with
- 9:05:14stakeholders.
- 9:05:16Now, meetings are necessary and the
- 9:05:18project manager should ensure all
- 9:05:20meetings are meaningful and provide
- 9:05:22value to participants by following 10
- 9:05:25meeting rules. Let's look at the first
- 9:05:27five meeting rules. Rule one, meeting
- 9:05:30goals are clear and actionable. Rule
- 9:05:33two, an agenda should always be shared.
- 9:05:36A best practice for agendas is the 4824
- 9:05:40rule, meaning the agenda should be sent
- 9:05:42out 48 hours prior to the meeting and
- 9:05:45the meeting minutes or notes should be
- 9:05:47sent out no later than 24 hours after
- 9:05:50the meeting. Rule three, publish minutes
- 9:05:53to act as a reminder on the next steps
- 9:05:55and so that action items are defined.
- 9:05:58Rule four, share the purpose of the
- 9:06:00meeting with attendees. Evaluate who
- 9:06:03should be at the meeting and who does
- 9:06:05not need to be. Some members may be able
- 9:06:07to review minutes for needed
- 9:06:09information. And rule five, share
- 9:06:12materials and pre-work 48 hours before
- 9:06:15the meeting. Many meetings fail to
- 9:06:17achieve objectives due to stakeholders
- 9:06:20guessing what the meeting is about
- 9:06:21during the meeting. Now, let's look at
- 9:06:24the remaining five meeting rules a
- 9:06:26project manager should employ to ensure
- 9:06:28meetings are meaningful and valuable.
- 9:06:31Rule six, provide opportunities to team
- 9:06:34members to facilitate certain meetings.
- 9:06:37Rule seven, hire a notetaker when
- 9:06:39comprehensive notes are required to
- 9:06:41ensure the project manager can focus on
- 9:06:43the meeting. Rule eight, assign owners
- 9:06:47to action items and ensure stakeholders
- 9:06:49leave the meeting with an understanding
- 9:06:51and commitment to accomplishing their
- 9:06:53tasks. Rule nine, practice
- 9:06:56nonattribution.
- 9:06:58A meeting environment should allow
- 9:06:59stakeholders to feel comfortable and
- 9:07:02safe sharing ideas and opinions that may
- 9:07:04contradict others. There may be times
- 9:07:07when stakeholders want to discuss issues
- 9:07:10not pertinent to the current meeting.
- 9:07:12And when this occurs, use what is called
- 9:07:14a parking lot method to provide a space
- 9:07:16for comments, discussions, or questions
- 9:07:19that are not related to the current
- 9:07:21meeting's agenda. By placing these
- 9:07:23topics to the side, they are not being
- 9:07:26ignored, but will be dealt with later.
- 9:07:29And finally, rule 10, end the meeting
- 9:07:31early if the objectives are met. Meet
- 9:07:34for purpose, not just to fill up time.
- 9:07:37So, virtual communication requirements
- 9:07:40are a necessity in today's global
- 9:07:42environment where stakeholders and team
- 9:07:44members may not be able to meet face to
- 9:07:47face. The Project Management Institute
- 9:07:49or PMI recognizes the following best
- 9:07:53practices for virtual communication.
- 9:07:56Planning regular and clear
- 9:07:57communications to avoid communication
- 9:07:59gaps. Defining roles and
- 9:08:02responsibilities early in the project.
- 9:08:05Using best meeting practices such as
- 9:08:07agendas and publishing the minutes.
- 9:08:10Developing meeting norms and ground
- 9:08:12rules and sticking with them. Striving
- 9:08:15to have a shared vision, outcome, and
- 9:08:17sense of purpose. Promoting an open team
- 9:08:20culture where all team members are
- 9:08:22listened to, respected, and comfortable
- 9:08:25asking others for help. Building
- 9:08:27relationships, rapport, and trust.
- 9:08:30Understanding team members perspectives
- 9:08:32and how they prefer to work. Using
- 9:08:35familiar technology and providing
- 9:08:37technology training when necessary.
- 9:08:40requesting virtual meeting members
- 9:08:42activate their camera when speaking,
- 9:08:44promoting use of screen sharing
- 9:08:46technology, and finally using a common
- 9:08:49repository that all can easily access.
- 9:08:53Now, PMI defines four values that drive
- 9:08:56effective communications in their code
- 9:08:58of ethics, which are responsibility,
- 9:09:01respect, fairness, and honesty. PMI
- 9:09:04defines responsibility as the duty to
- 9:09:07take ownership for the decisions we make
- 9:09:09or fail to make, the actions we take or
- 9:09:12fail to take, and the consequences that
- 9:09:15result. Project managers have a duty to
- 9:09:18set a positive example and to accept
- 9:09:20accountability for the project. PMI
- 9:09:23defines respect as duty to show a high
- 9:09:26regard for ourselves, others, and the
- 9:09:29resources entrusted to us. Project
- 9:09:32managers who show respect for others
- 9:09:34receive respect in return. PMI defines
- 9:09:38fairness as duty to make decisions and
- 9:09:41act partially and objectively. A project
- 9:09:44team is a close-knit group and project
- 9:09:47managers should strive to create an
- 9:09:49environment of fairness. And finally,
- 9:09:52PMI defines honesty as duty to
- 9:09:55understand the truth and act in a
- 9:09:58truthful manner both in our
- 9:09:59communication and in our conduct.
- 9:10:02Project managers should be honest and
- 9:10:05truthful to the team.
- 9:10:07In this video, you learned the primary
- 9:10:10responsibilities of a project manager
- 9:10:12when monitoring communications, 10
- 9:10:14meeting rules for effective meetings,
- 9:10:17PMI's best virtual communication
- 9:10:20practices, and PMI's four values to
- 9:10:23drive communication.
- 9:10:28[Music]
- 9:10:34Welcome to Expert Viewpoints, Monitoring
- 9:10:36and Controlling Communications. In this
- 9:10:39video, we will hear from project
- 9:10:41managers discussing monitoring and
- 9:10:43controlling communications.
- 9:10:46I could probably spend hours on this
- 9:10:47particular subject, but I'm going to
- 9:10:49narrow it down to two key tips. Tip
- 9:10:52number one, know your audience. Not
- 9:10:54everybody is the same. Different people
- 9:10:56have different communication styles. You
- 9:10:59as a project manager need to understand
- 9:11:01what that communication style is, how
- 9:11:04people are most comfortable
- 9:11:05communicating, and whenever possible,
- 9:11:08try to adapt your style to fit the needs
- 9:11:11of the audience. In addition, adjust
- 9:11:14your media. What is the definition of
- 9:11:16insanity? You've probably heard this
- 9:11:18before. It's doing the same thing over
- 9:11:20and over again and getting the same
- 9:11:22unsatisfactory or poor results. So,
- 9:11:25here's a case in point. Say you send out
- 9:11:27three emails and the stakeholder does
- 9:11:29not respond. Don't send out that fourth
- 9:11:32email. Try a different media to go ahead
- 9:11:35and reach them.
- 9:11:38To ensure the quality of communication
- 9:11:40remains constant throughout a project,
- 9:11:42it's important to establish what cadence
- 9:11:45of communication you're going to have at
- 9:11:48the beginning of the project. Whether
- 9:11:50that means scheduling daily standups,
- 9:11:52weekly check-ins, larger check-in
- 9:11:55meetings after having weekly check-ins
- 9:11:58is up to you and the rest of the project
- 9:12:00stakeholders. But it's important to
- 9:12:02ultimately establish what that cadence
- 9:12:04is going to be and stick through it. And
- 9:12:06then in order to make sure that that
- 9:12:08cadence is stuck through, it's helpful
- 9:12:10to have those reoccurring meetings set
- 9:12:12from the beginning. Just put it on the
- 9:12:14Google calendar, set a recurring meeting
- 9:12:15time, and it's there. And then with
- 9:12:17that, I also like to include writing
- 9:12:19meeting notes. So I use Google Docs. And
- 9:12:23within that, I like to have all of our
- 9:12:25meeting notes in there for every single
- 9:12:27time that we meet with our vendors and
- 9:12:30stakeholders, so we have a record of
- 9:12:31what we've discussed. And then it also
- 9:12:33gives us a good template to follow
- 9:12:35through for the rest of our meetings.
- 9:12:37It's also really helpful to have uh
- 9:12:39weekly email check-ins as well. I find
- 9:12:42uh it's good to send an end of the week
- 9:12:46recap that just runs through what the
- 9:12:48accomplishments are, what any blockers
- 9:12:50are, if there are any blockers, what are
- 9:12:52we doing to solve for those blockers,
- 9:12:54and also call out if there's any piece
- 9:12:56of the project that needs to be
- 9:12:58escalated.
- 9:13:00When you have a communication plan, uh
- 9:13:03it can be very easy to let that
- 9:13:04communication plan slip as a project is,
- 9:13:06you know, well underway and people are
- 9:13:08doing their jobs and they get the a
- 9:13:10sense of what's happening. You might
- 9:13:12find yourself, particularly over a
- 9:13:14couple of milestones in a project,
- 9:13:15repeating the same information. I'm
- 9:13:17going to send out the status report.
- 9:13:19Nothing has really changed because our
- 9:13:20milestones are a couple of weeks out.
- 9:13:22So, we're having the same um essentially
- 9:13:24the same information uh over and over
- 9:13:27again. And that can get a little um
- 9:13:29tedious, but what it does do, I think,
- 9:13:32is build discipline. So, if you have a
- 9:13:34plan, I'm going to send out status twice
- 9:13:36a week. Um you send you should send out
- 9:13:39status twice a week. If you're going to
- 9:13:41do a daily recap of the day's work, do a
- 9:13:44daily recap of the day's work and just
- 9:13:46be disciplined about it. And sometimes
- 9:13:48if the information hasn't changed that
- 9:13:50much, you can copy and paste from the
- 9:13:52last status report and then just make
- 9:13:54minor modifications as needed. The other
- 9:13:57technique that I found that really helps
- 9:13:59is that as soon as I send out a status
- 9:14:01report, I start the next one. So, I'll
- 9:14:03create a template. I if it's a word
- 9:14:05document or even if it's a message, you
- 9:14:07know, something in a message board, I'll
- 9:14:09start something in a notepad um in a
- 9:14:12digital notepad and I'll start my next
- 9:14:14status report. And as things change in
- 9:14:16that whatever that cadence is for your
- 9:14:18communications, as things change, I
- 9:14:21write them down. And then by the time
- 9:14:23it's, you know, that the the moment
- 9:14:25comes to send out that next status
- 9:14:26report, you've essentially created it
- 9:14:28because you've been doing it um over the
- 9:14:30course of a few days
- 9:14:32>> to make sure that everything is
- 9:14:33consistent with communication throughout
- 9:14:35a project. It's great to already have
- 9:14:37processes in place. This is where your
- 9:14:40PMO organization is super helpful for
- 9:14:43you. First off, if you already have
- 9:14:46pre-planned out templates on what your
- 9:14:49status reports will look like, your
- 9:14:52weekly reports, whatever it might be, or
- 9:14:54even presentations, that way, everyone
- 9:14:57already knows what they're expecting.
- 9:15:00When you have that expectation, they're
- 9:15:02able to easily reference it for future
- 9:15:05and they know what's coming. Be timely
- 9:15:07about your communications as well.
- 9:15:09If I'm using
- 9:15:11data as part of my communications, I
- 9:15:15like to always make sure that I'm
- 9:15:17pulling that data from the same place so
- 9:15:19that week after week um my data points
- 9:15:22don't look different. I'm not reporting
- 9:15:24on man hours one week and team hours
- 9:15:27another week or I'm not reporting on
- 9:15:30number of tasks done versus number of
- 9:15:33project objectives met. I'm always
- 9:15:36constantly communicating the same data
- 9:15:38and the same information to the
- 9:15:41stakeholders. So again, they know what
- 9:15:43to expect. They know what to look for.
- 9:15:45They can think through what questions
- 9:15:46that they want to ask. And it just helps
- 9:15:48keep the quality of the communications
- 9:15:52consistent.
- 9:15:53>> The stakeholder register and
- 9:15:55communications management plan. As the
- 9:15:57project evolves, things are going to
- 9:15:59change. Stakeholders are going to come
- 9:16:01and they're going to go ahead and go.
- 9:16:03The different communication requirements
- 9:16:05early in the project are going to change
- 9:16:08as the project progresses. Stay a breast
- 9:16:11of those changes. Update your
- 9:16:13stakeholder register. Update your
- 9:16:15communications management plan and make
- 9:16:17sure that all of the key stakehold
- 9:16:19stakeholders are aware of those
- 9:16:21adjustments and updates. In addition,
- 9:16:24people are people. Sometimes personal
- 9:16:26issues are are going to occur. As a
- 9:16:29project management manager, going back
- 9:16:31to MBWAT, management by walking and
- 9:16:34talking, you need to get out and meet
- 9:16:36your people. If there is an issue,
- 9:16:39chances are pretty good that issue is
- 9:16:40not going to come to you. Sometimes you
- 9:16:43have to go out and find it. And in
- 9:16:45addition, if you suspect that there are
- 9:16:47going to be some personnel issues, some
- 9:16:49resource challenges, have a backup plan.
- 9:16:53Do your best to go ahead and support
- 9:16:55your people, but also have a backup plan
- 9:16:57just in case to go ahead and support
- 9:17:00your project.
- 9:17:02Number one is a lack of commitment. This
- 9:17:05is a huge risk. You need to take time to
- 9:17:08determine the required levels of
- 9:17:10commitment from each particular
- 9:17:12stakeholder and then determine a
- 9:17:15strategy to go ahead and get them to
- 9:17:17where they may be need to be. There may
- 9:17:21be some stakeholders that only require
- 9:17:24support. There may be others who need to
- 9:17:26be leading. You need to identify what
- 9:17:29that level of commitment is and those
- 9:17:31strategies that you employ need to be
- 9:17:32effective in moving them in that right
- 9:17:35direction. Number two, poor
- 9:17:38collaboration. Again, develop that
- 9:17:40stakeholder register. Develop that
- 9:17:42communications management plan. Make
- 9:17:45sure that all of the key stakeholders
- 9:17:47understand their roles and
- 9:17:48responsibilities and commit to these
- 9:17:50roles and responsibilities before you
- 9:17:53finalize that particular document. Make
- 9:17:55sure that they they understand it and
- 9:17:57make sure that they're ready to go ahead
- 9:17:59and commit and follow through so that
- 9:18:02you can meet the goals of the project.
- 9:18:04You can meet your needs and you can meet
- 9:18:07their needs as well. Um, I think it's
- 9:18:09worth saying that you don't want to do
- 9:18:12too much in a communication plan because
- 9:18:14if you are going to remain consistent,
- 9:18:17the more you overburden your
- 9:18:18communications, the more difficult it is
- 9:18:21going to be to do it regularly and
- 9:18:23consistently.
- 9:18:25The more you overburden your
- 9:18:26communications, the more difficult it's
- 9:18:28going to be to do regularly and
- 9:18:30consistently. So, if your communication
- 9:18:32plan always involves taking a number of
- 9:18:34screenshots or filling out a spreadsheet
- 9:18:36and creating a word doc and you're
- 9:18:38trying to do that multiple times a week
- 9:18:40or even once a week, the more friction
- 9:18:43that you put in front of yourself for
- 9:18:44your communication plan, the less you're
- 9:18:46going to be inclined to do it. So, I
- 9:18:47would say, you know, you can also
- 9:18:49mitigate risk by keeping your plan um
- 9:18:52fairly simple, uh fairly, you know,
- 9:18:55succinct and and and concise. Um, and
- 9:18:59that will also help you remain
- 9:19:00consistent so that you're you're it's
- 9:19:02easy easy to do. If you can templatize
- 9:19:04things, whether it be a document or um a
- 9:19:07slack message or even a spreadsheet,
- 9:19:09keep it templatized and then you just,
- 9:19:11you know, easily fill in those lines in
- 9:19:13a spreadsheet or fill in that template
- 9:19:15in a document.
- 9:19:17>> To make sure communication is effective,
- 9:19:20it must be clear. Unclear messages just
- 9:19:23cause miscommunication.
- 9:19:26From there also we have a lack of
- 9:19:28transparency.
- 9:19:29Give a responsible reasonable timeline.
- 9:19:33If you're saying it's going to be done
- 9:19:34next week and it's really going to be
- 9:19:36done about a month from now because
- 9:19:38there's potential risk that are
- 9:19:39involved, do not say it's going to be
- 9:19:42next week just to make your boss happy.
- 9:19:45Lack of responsiveness.
- 9:19:47This is a huge one. Communication has to
- 9:19:49be an open door and it also has to be
- 9:19:52done timely.
- 9:19:56[Music]
- 9:20:04Welcome to identify stakeholders. After
- 9:20:08watching this video, you will be able to
- 9:20:11identify potential questions from a
- 9:20:13stakeholder perspective at the time of
- 9:20:15project proposal. Summarize the purpose
- 9:20:17of a stakeholder register. Explain the
- 9:20:20structure of a stakeholder register.
- 9:20:22Describe the key tools and techniques
- 9:20:24used to identify stakeholders and
- 9:20:27explain the steps to effectively
- 9:20:29identify stakeholders and gain
- 9:20:31commitment.
- 9:20:33After the initial project proposal
- 9:20:35phase, there are four questions on the
- 9:20:37minds of stakeholders. And these
- 9:20:39questions need to be answered in a
- 9:20:41logical order to move forward with the
- 9:20:44project. Questions one and two are basic
- 9:20:47including what is the project and why
- 9:20:50does the project matter? A project
- 9:20:52stakeholder can find answers to these
- 9:20:54questions in the project charter.
- 9:20:57Question three is who are the
- 9:20:59stakeholders and stakeholders include
- 9:21:02customers, end users, sponsor, team,
- 9:21:05subject matter experts or SMEES and so
- 9:21:08on. A project stakeholder can find
- 9:21:10answers related to stakeholders in the
- 9:21:13stakeholder register. And the fourth and
- 9:21:16final question is how will we execute
- 9:21:18the project? A detailed response to this
- 9:21:21question can be found in the project
- 9:21:23plan that a project manager creates
- 9:21:26during the planning phase. So let us now
- 9:21:29understand the purpose of the
- 9:21:31stakeholder register. A stakeholder
- 9:21:33register is a critical project document
- 9:21:36that includes stakeholder details such
- 9:21:39as name, role, area of expertise and so
- 9:21:42on. The stakeholder register forms an
- 9:21:45input into various project activities
- 9:21:48including project planning,
- 9:21:50communications, and project governance.
- 9:21:53Now, a project manager must create a
- 9:21:55stakeholder register at project
- 9:21:57initiation in conjunction with the
- 9:22:00project charter. When the sponsor and
- 9:22:03senior management approve the project
- 9:22:05charter, the project manager also
- 9:22:07finalizes the stakeholder register. And
- 9:22:10the project charter and stakeholder
- 9:22:12register enable the project manager to
- 9:22:14start with the project planning phase.
- 9:22:17Most project managers develop a
- 9:22:19stakeholder register using Microsoft
- 9:22:22Excel or Word and it can be in tabular
- 9:22:25format. The stakeholder register capture
- 9:22:28several key pieces of information. Let's
- 9:22:31review that required information.
- 9:22:33Identify each stakeholder by name.
- 9:22:36Though there may be times when the
- 9:22:38project manager may not know the name of
- 9:22:40the stakeholder. For example, if the
- 9:22:43project manager has not been able to
- 9:22:45identify and assign a SME to the
- 9:22:47project, simply leave the name blank.
- 9:22:50Specify the organization name, which is
- 9:22:53important when multiple organizations,
- 9:22:55including contracting agencies,
- 9:22:57participate in the project. And note,
- 9:23:00you can ignore this detail for small
- 9:23:02projects with only one organization.
- 9:23:05Next, provide a brief description of the
- 9:23:08role that the stakeholder place in the
- 9:23:10project and list the responsibilities
- 9:23:12using RECI designators. Let's quickly
- 9:23:16review these. R indicates responsible.
- 9:23:19The stakeholder will take the
- 9:23:20responsibility of completing the
- 9:23:22specified project work or tasks. A
- 9:23:26represents accountable. The stakeholder
- 9:23:28will be held accountable for certain
- 9:23:30work on the project and accountable
- 9:23:33implies that the stakeholder needs to
- 9:23:35ensure the work is accomplished though
- 9:23:38they may not necessarily perform the
- 9:23:40work. C indicates consult. The
- 9:23:43stakeholder must be available to provide
- 9:23:46expertise and guidance and I indicates
- 9:23:50inform. The stakeholder will be informed
- 9:23:52about the specified work as the project
- 9:23:55progresses.
- 9:23:56And the final key piece of information
- 9:23:58on the stakeholder register is comments.
- 9:24:02Document additional information,
- 9:24:04references or clarification which are
- 9:24:07helpful to the project. Now there are a
- 9:24:10number of tools and techniques used to
- 9:24:12identify stakeholders. Here are a few
- 9:24:15recommendations by the project
- 9:24:17management institute or PMI.
- 9:24:20Expert judgment is a technique where the
- 9:24:22project manager consults with experts
- 9:24:25who can share the stakeholder
- 9:24:26requirements for the project.
- 9:24:28Identification meetings are another
- 9:24:30technique. Invite all stakeholders that
- 9:24:33might be impacted by or interested in
- 9:24:36the project and strive to have a
- 9:24:39representative for each stakeholder
- 9:24:41group. Stakeholder mapping is a
- 9:24:43technique to identify stakeholders based
- 9:24:46on their relative power and interest in
- 9:24:48the project. The stakeholder mapping
- 9:24:51technique places each stakeholder into
- 9:24:54one of four quadrants and provides
- 9:24:56management guidance for each. Note, if
- 9:24:59you plan to attempt the CAPM exam, you
- 9:25:02must know this model. Now, document
- 9:25:05analysis is another PMI recommended
- 9:25:08technique. Review initial project
- 9:25:10documents such as the business case,
- 9:25:13contracts, and service level agreements.
- 9:25:16You will discover stakeholders in these
- 9:25:18documents. And PMI also recommends using
- 9:25:22brainstorming as a technique to identify
- 9:25:24stakeholders. Use brainstorming to pose
- 9:25:27a question and facilitate the free flow
- 9:25:30of ideas.
- 9:25:32So, we've discussed the tools and
- 9:25:34techniques that PMI recommends for
- 9:25:36identifying stakeholders. Let's now
- 9:25:38review the steps to develop and
- 9:25:40communicate the stakeholder register to
- 9:25:43all stakeholders.
- 9:25:44The first step is to determine
- 9:25:46stakeholders by using PMI recommended
- 9:25:49tools and techniques. Next, complete the
- 9:25:52initial stakeholder register and
- 9:25:54document the key components such as
- 9:25:56name, organization, and role. Then
- 9:26:00analyze each role in terms of
- 9:26:02responsibilities using REI designators.
- 9:26:05Some stakeholders may have a single
- 9:26:08responsibility such as an R or C while
- 9:26:11other stakeholders may have multiple
- 9:26:13responsibilities such as RC. The next
- 9:26:17step is to have the meeting before the
- 9:26:19meeting. Collaborate with each
- 9:26:21stakeholder to determine if they can
- 9:26:24satisfy the role and responsibilities
- 9:26:26assigned and document any issues such as
- 9:26:30limited capacity in the comment section.
- 9:26:33After documenting the details, share the
- 9:26:35stakeholder register with the sponsor.
- 9:26:38Make sure to get confirmation from the
- 9:26:40sponsor on the stakeholder details
- 9:26:43before moving to the planning phase. If
- 9:26:46what, why, and who questions are
- 9:26:49answered and the project remains
- 9:26:51feasible, then move to the planning
- 9:26:53phase.
- 9:26:55In this video, you learned that
- 9:26:57questions asked after project proposal
- 9:27:00include what is the project? Why does
- 9:27:03the project matter? Who are the
- 9:27:05stakeholders? And how will we execute
- 9:27:08the project? The purpose of a
- 9:27:10stakeholder register is to capture
- 9:27:12stakeholder information. The stakeholder
- 9:27:15register captures several key
- 9:27:17stakeholder details including name,
- 9:27:19organization, role, responsibility, and
- 9:27:22comments. Responsibility is captured
- 9:27:25using RECI designators, responsible,
- 9:27:28accountable, consult, and inform. PMI
- 9:27:32recommends using various tools and
- 9:27:34techniques to identify stakeholders
- 9:27:36including expert judgment,
- 9:27:38identification meetings, stakeholder
- 9:27:41mapping, document analysis, and
- 9:27:43brainstorming.
- 9:27:45And finally, follow the recommended
- 9:27:47process to develop and communicate the
- 9:27:49stakeholder register.
- 9:27:54[Music]
- 9:28:02Welcome to plan stakeholder engagement.
- 9:28:05After watching this video, you will be
- 9:28:08able to summarize the purpose of a
- 9:28:10stakeholder engagement plan, explain the
- 9:28:12structure of a stakeholder engagement
- 9:28:14plan, describe key strategies to receive
- 9:28:17desired stakeholder commitment, and
- 9:28:20explain why a stakeholder engagement
- 9:28:22plan is a close hold plan. Planning
- 9:28:26stakeholder engagement is essential for
- 9:28:28project success. The stakeholder
- 9:28:30engagement plan documents current and
- 9:28:33desired levels of engagement for key
- 9:28:36stakeholders identified in the
- 9:28:37stakeholder register. And in addition to
- 9:28:40engagement levels, the stakeholder
- 9:28:42engagement plan outlines strategies to
- 9:28:45help sustain positive levels and move
- 9:28:48other stakeholders to expected levels.
- 9:28:51Now, project managers develop a
- 9:28:53stakeholder engagement plan using
- 9:28:55Microsoft Excel, Microsoft Word, or
- 9:28:58Microsoft PowerPoint. A stakeholder
- 9:29:00engagement plan should be in tabular
- 9:29:03format and captures key information like
- 9:29:06the following. A key entry is the
- 9:29:09stakeholder name or position. Remember
- 9:29:12that not all stakeholders on the
- 9:29:14stakeholder register need to be
- 9:29:16annotated in the stakeholder engagement
- 9:29:18plan. The stakeholder engagement plan
- 9:29:21targets critical stakeholders who are
- 9:29:23generally external and are not directly
- 9:29:26associated with project planning.
- 9:29:29Another key piece of information is the
- 9:29:31current level of commitment. The Project
- 9:29:34Management Institute or PMI provides
- 9:29:37recommended commitment levels and the
- 9:29:39five commitment levels include unaware,
- 9:29:42resistant, neutral, supportive, and
- 9:29:45leading as documented in the stakeholder
- 9:29:48engagement assessment matrix tool from
- 9:29:51PMI. So the project manager maps the
- 9:29:54current commitment levels of key
- 9:29:56stakeholders in each phase of the
- 9:29:58project management life cycle. For
- 9:30:01example, if the stakeholder is not open
- 9:30:03to committing to the project work, map
- 9:30:06them to commitment level resistant. Or
- 9:30:09if a stakeholder must influence others
- 9:30:11to commit, map the stakeholder to
- 9:30:13commitment level supporting. Also,
- 9:30:16include the desired commitment level
- 9:30:18from the stakeholder to support project
- 9:30:20objectives. Finally, add strategies to
- 9:30:23sustain or achieve desired levels of
- 9:30:26commitment in the stakeholder engagement
- 9:30:28plan. Let's now look at some strategies
- 9:30:31recommended by PMI to engage
- 9:30:33stakeholders and gain commitment.
- 9:30:36Influencing is a critical interpersonal
- 9:30:39skill to engage stakeholders. For
- 9:30:41example, if a project manager is able to
- 9:30:44influence a resistant stakeholder with
- 9:30:47project values, there is a greater
- 9:30:49possibility of that stakeholder becoming
- 9:30:52supportive. Engage stakeholders early.
- 9:30:55The project manager should engage with
- 9:30:57stakeholders as soon as the stakeholder
- 9:30:59register is approved. Late
- 9:31:02identification often leads to
- 9:31:04frustration, anger, or lost support.
- 9:31:07Another strategy is to share and discuss
- 9:31:10the project charter with stakeholders.
- 9:31:13Ensure all key stakeholders review the
- 9:31:15project charter. When stakeholders
- 9:31:18understand project objectives and value,
- 9:31:21commitment often increases.
- 9:31:24Asking questions is another strategy.
- 9:31:27Ask relevant questions and try to
- 9:31:29understand the perspective of other
- 9:31:31stakeholders. Use active listening
- 9:31:34skills. Some inputs may be valuable
- 9:31:37while others may not. Be open to
- 9:31:39suggestions and improvements.
- 9:31:42Getting stakeholders to collaborate is
- 9:31:44another good strategy. Collaboration
- 9:31:47helps address issues as early as
- 9:31:49possible. For example, capacity issues
- 9:31:52may be discovered through a simple
- 9:31:54conversation or meeting. Integrity is
- 9:31:58another strong strategy. Lead with
- 9:32:00integrity and commitment may follow. For
- 9:32:03example, if you set a positive example,
- 9:32:06others may follow. Include stakeholders
- 9:32:09in planning. Share scope, schedule, and
- 9:32:12budget recommendations before the
- 9:32:14project management plan is presented.
- 9:32:17Keep people informed and avoid
- 9:32:19surprises. Surprises can lower
- 9:32:22commitment levels. Build the team. An
- 9:32:25effective project manager works with the
- 9:32:27team to identify issues and lagging
- 9:32:30commitment levels. For example, a team
- 9:32:33member will disclose more in a simple
- 9:32:35conversation than in numerous emails.
- 9:32:38Manage expectations. Clearly defined
- 9:32:41roles and responsibilities and
- 9:32:43well-defined and value added project
- 9:32:46objectives go a long way to help gain
- 9:32:49commitment. Look for triggers early that
- 9:32:51may lead to lowered commitment. Rewards
- 9:32:54matter. Recognize stakeholders who
- 9:32:57perform at a high level and if your
- 9:32:59budget is limited, at minimum say thank
- 9:33:02you. And finally, communicate
- 9:33:05effectively. Remember, communication is
- 9:33:0890% of a project manager's job.
- 9:33:11Effective communication is often the
- 9:33:14difference between sustained or lost
- 9:33:16commitment.
- 9:33:18So, the stakeholder engagement plan is a
- 9:33:20unique document that must be
- 9:33:22accomplished. At the same time, the
- 9:33:25stakeholder engagement plan is only
- 9:33:27shared with select stakeholders. But why
- 9:33:30only select stakeholders? The answer is
- 9:33:34that many stakeholders might take
- 9:33:35offense if they are publicly documented
- 9:33:38as resistant or neutral. Hard feelings
- 9:33:41can develop and bridges may be burned
- 9:33:43that can never be repaired. So the
- 9:33:46stakeholder engagement plan therefore
- 9:33:48needs to be closehold and only used by
- 9:33:51the project manager and core project
- 9:33:54team.
- 9:33:56In this video, you learned that the
- 9:33:58stakeholder engagement plan contains key
- 9:34:00stakeholder engagement details,
- 9:34:02including current and desired commitment
- 9:34:05levels and engagement strategies for key
- 9:34:08stakeholders. The stakeholder engagement
- 9:34:10plan can be in tabular format using
- 9:34:14Microsoft Excel, Word, or PowerPoint.
- 9:34:17Strategies for engagement include
- 9:34:19influencing, direct impact on
- 9:34:22stakeholders, engage early, share and
- 9:34:25discuss, ask questions, collaborate,
- 9:34:28integrity, involvement, build a team,
- 9:34:31manage expectations, rewards, and
- 9:34:34effective communication.
- 9:34:36And the stakeholder engagement plan is a
- 9:34:39close hold document and is only shared
- 9:34:42with select stakeholders.
- 9:34:47[Music]
- 9:34:53Welcome to expert viewpoints stakeholder
- 9:34:56management tools. In this video, we will
- 9:34:59hear from project managers discussing
- 9:35:01project management tools. What are some
- 9:35:03common tools and techniques you use to
- 9:35:05effectively manage stakeholders?
- 9:35:08>> Hello again everyone. My name is Dan
- 9:35:10Yman's and today I have the pleasure of
- 9:35:13sharing a few more questions and answers
- 9:35:15that are pertinent to your project
- 9:35:18management journey through this
- 9:35:19particular course. The first question I
- 9:35:22want to go ahead and respond to is what
- 9:35:25are some common tools and techniques you
- 9:35:27use to effectively manage stakeholders?
- 9:35:31The first one, and you've probably heard
- 9:35:33this before if you've listened to any of
- 9:35:35my prior interviews, is a stakeholder
- 9:35:37register. This is the one of the first
- 9:35:39documents that you go ahead and create.
- 9:35:42A stakeholder register is a list of key
- 9:35:44stakeholders who are essential to the
- 9:35:47success of the project. A stakeholder
- 9:35:50register lists all of these key
- 9:35:52stakeholders by name or position and
- 9:35:55assigns them a designator using RACI or
- 9:35:59REI terminology. R stands for
- 9:36:02responsible. Who are the stakeholders
- 9:36:04who are going to be required to do the
- 9:36:06work? A is accountable. Who are the
- 9:36:09stakeholders who are going to be
- 9:36:10accountable for the final results of a
- 9:36:12deliverable or the project as a whole? C
- 9:36:15stands for consult. Who are those
- 9:36:17subject matter experts whose expertise
- 9:36:19you're going to be dependent upon to
- 9:36:21complete the project successfully? And I
- 9:36:24is inform. Who are those individuals who
- 9:36:26require information that you're going to
- 9:36:28go ahead and keep in the loop.
- 9:36:31The second document that I want to go
- 9:36:33ahead and share is a stakeholder
- 9:36:35engagement plan. What we do with the
- 9:36:38stakeholder engagement plan is we take
- 9:36:40this list that we had on the stakeholder
- 9:36:42register of the key stakeholders and
- 9:36:44then we assign them a designator in
- 9:36:47terms of their current level of
- 9:36:48commitment and their desired level of
- 9:36:51commitment or your desired level of
- 9:36:53commitment that is required for them to
- 9:36:55successfully satisfy the needs of the
- 9:36:58particular project. We take the current
- 9:37:01level of commitment and desired level of
- 9:37:03commitment and we analyze where they're
- 9:37:05at and where they need to be and we
- 9:37:08develop strategies that we will
- 9:37:09implement a little bit later in the
- 9:37:11project. The project management
- 9:37:13institute has five categorizations that
- 9:37:16they often use for the current and
- 9:37:18desired level of commitment. One of them
- 9:37:21is you unaware. If someone's unaware,
- 9:37:23you develop a strategy to make them
- 9:37:25aware. Another is resistant. If someone
- 9:37:28is resistant, normally you want to spend
- 9:37:31a little bit of time sharing the benefit
- 9:37:33of the project, the value proposition of
- 9:37:35the project, and hopefully try to win
- 9:37:36them over. Someone who is neutral, which
- 9:37:39is coded as N, is someone who's on the
- 9:37:42fence. They see some merit in the
- 9:37:43project, but they also see some problems
- 9:37:45in the project. Go ahead and embrace the
- 9:37:48merit and try to go ahead and dispel the
- 9:37:50problems. S stands for supportive. This
- 9:37:53is someone who supports the project,
- 9:37:55who's willing to go ahead and do what it
- 9:37:57takes to evangelize the project. And L
- 9:38:00is leading. These are people who are
- 9:38:02actually going to be required to
- 9:38:03actually do something for the project.
- 9:38:06>> Hi, my name is Paul Partardi. Um, I've
- 9:38:09had uh a few titles in my career. I've
- 9:38:12served as a software development manager
- 9:38:15as well as a content manager for some
- 9:38:18fairly large teams. Um, and while I've
- 9:38:20never had the role of project manager
- 9:38:23per se, I've done a lot of project
- 9:38:24management in both of my roles in my
- 9:38:26career. So, a lot of my work involved
- 9:38:29ensuring that my team was on track and
- 9:38:31motivated, that they knew what their
- 9:38:33schedules and deliverables were, and
- 9:38:35then ensuring that uh once those
- 9:38:37deliverables were met, that I was
- 9:38:38communicating with upper management. So,
- 9:38:40did a lot of the same uh roles and and
- 9:38:42uh some of the same tasks as a project
- 9:38:44manager. In my experience, um, tools
- 9:38:47that work the best in managing
- 9:38:49stakeholders, um, have been something as
- 9:38:51simple as a spreadsheet. Um, seems like
- 9:38:54everybody could knows how to read
- 9:38:55spreadsheets. Most people know how to
- 9:38:57read spreadsheets today. There's a lot
- 9:38:58of new tools that have come out in some
- 9:39:01of the um, the team management software
- 9:39:03like Microsoft Teams. Even Slack has
- 9:39:06like a lot of interesting um,
- 9:39:08stakeholder management tools that allow
- 9:39:09you to communicate broadly to an
- 9:39:11audience. um collaborate with
- 9:39:14stakeholders so they can you know update
- 9:39:16uh um documents or rows in a spreadsheet
- 9:39:19or even uh little widgets on a page um
- 9:39:22task widgets. Uh so those tools can be
- 9:39:25effective. However, um you know it
- 9:39:27really depends on the stakeholders that
- 9:39:29you're working with, how uh inclined
- 9:39:31they are to use technology and whether
- 9:39:33they're technical. Um that can that can
- 9:39:35be a little bit uh polarizing if you
- 9:39:37have a team or stakeholders that are not
- 9:39:40um that are not technical. Um in terms
- 9:39:43of techniques uh techniques I I found
- 9:39:46you know you you want to work with your
- 9:39:48stakeholders as partners um generally
- 9:39:51when I set up a project I I try to
- 9:39:54ensure that it's not the project manager
- 9:39:57trying to drive everybody to get the
- 9:39:59project done or it's not the project
- 9:40:01manager that is um you know kind of
- 9:40:04antagonistic with the stakeholders right
- 9:40:07um what I try to do is is ensure that
- 9:40:10you know we're all on the same side
- 9:40:11working towards the you know the end
- 9:40:13goal and the enemy is not with the
- 9:40:16stakeholders. The enemy is not with the
- 9:40:18team. The enemy tends to be time. The
- 9:40:20enemy tends to be money. And all of us
- 9:40:23together, the stakeholders, the people
- 9:40:25doing the actual work and the project
- 9:40:27manager are all on the same side against
- 9:40:29those those things that can cause
- 9:40:31friction and cause problems. And I try
- 9:40:34to set that up early so that if if I
- 9:40:36encounter a problem in the project, I
- 9:40:39can go to the stakeholders and say, "How
- 9:40:41are we going to solve this?"
- 9:40:43>> Hello, my name is Katherine Brooks. I'm
- 9:40:45an engineering project manager at Tech
- 9:40:47Systems for Apple. I am my PMP and my
- 9:40:50MBA from UNC Chapel Hill. I have 12
- 9:40:52years experience
- 9:40:55to effectively manage stakeholders.
- 9:40:57First, I use communication planning
- 9:41:00methods, then stakeholder mapping and
- 9:41:04engagement plans and risk and issue
- 9:41:06plans.
- 9:41:08Hi, my name is Erikica Maldonado and I'm
- 9:41:10a program manager at Corsera.
- 9:41:13To plan to effectively communicate with
- 9:41:16key stakeholders in a project, it's
- 9:41:18important to establish what cadence you
- 9:41:20want to use first. So, for example, at
- 9:41:24the onset of a project, I like to
- 9:41:25establish whether or not we'll be
- 9:41:27checking in weekly or bi-weekly or if
- 9:41:31they need a larger check-in at any
- 9:41:33period of the month. Basically,
- 9:41:35establish what cadence you want to be
- 9:41:37able to have. And then how how ingrained
- 9:41:40in the details um other stakeholders
- 9:41:42want to be and some specific tools and
- 9:41:46techniques that I like to use. I have
- 9:41:49used different types of software. I have
- 9:41:51used ASA, I have used Smart Sheets, I
- 9:41:55have in some instances used Jira, but
- 9:41:58ultimately you'll want to find the
- 9:41:59software that makes sense for you. My
- 9:42:01preference for those types of software
- 9:42:03is that it's really easy to have
- 9:42:05different watchers on specific types of
- 9:42:08a project. So, you can tag certain
- 9:42:11stakeholders, you can create reports,
- 9:42:14you can um create tickets and resolve
- 9:42:17them from there. So, those are some
- 9:42:19tools that I like. It's really important
- 9:42:21to research and take a look at tools
- 9:42:23that you'd want to use for your own
- 9:42:24project as well.
- 9:42:27>> What are common stakeholder management
- 9:42:29challenges you encounter and how do you
- 9:42:31overcome them?
- 9:42:33>> To talk about two areas briefly. Number
- 9:42:35one, issues management. What is an
- 9:42:37issue? An issue is a problem or a
- 9:42:39question that a stakeholder has that is
- 9:42:41a potential blocker and is stopping them
- 9:42:44from doing what they need to do. And
- 9:42:46motivation and commitment. What is
- 9:42:48motivation and commitment? Motivation is
- 9:42:51that passion from within that drives you
- 9:42:54to do the right thing to do what you
- 9:42:57need to do to support the project. And
- 9:42:59commitment is your ability to go ahead
- 9:43:02and stick with it. So let's go ahead and
- 9:43:04talk about issues first. First of all,
- 9:43:06where there are issues, you may not find
- 9:43:09them. Oftentimes issues come to you very
- 9:43:12late and you have to be very very
- 9:43:15reactive and try to figure out how to
- 9:43:17solve them. Try to interact with the
- 9:43:19team as much as possible. Face to face
- 9:43:22is best. But if you can't meet people
- 9:43:24face to face in a virtual environment at
- 9:43:27minimum strive for voice contact.
- 9:43:30Sometimes a face-to-face meeting or just
- 9:43:32a quick conversation will help you to
- 9:43:35understand what some of those issues
- 9:43:36are. Whereas if you're strictly reliant
- 9:43:39upon email or other technical systems
- 9:43:42such as that, you may not get the
- 9:43:44information until it's too late. And in
- 9:43:46terms of motivation and commitment,
- 9:43:48there is a term called WFM
- 9:43:51with them. It stands for what's in it
- 9:43:53for me. One of the things that you
- 9:43:56really want to do in these face-to-face
- 9:43:58meetings or voice-tovoice meetings is
- 9:44:00continually remind stakeholders of the
- 9:44:03value of the project both to the
- 9:44:05organization and to them as well. Try to
- 9:44:08do everything in your power to give
- 9:44:10stakeholders a reason to stay the course
- 9:44:13and care. And again, that comes in two
- 9:44:15ways. Some people are very
- 9:44:17organizationally focused. How is this
- 9:44:19project going to help the organization?
- 9:44:22Others are individually focused. How is
- 9:44:24this project going to allow you to grow
- 9:44:26and to enhance your career?
- 9:44:29>> What are common stakeholder management
- 9:44:31challenges you encounter and how do you
- 9:44:34overcome them?
- 9:44:37Stakeholder management mistakes and
- 9:44:40barriers that I definitely have
- 9:44:42encountered in my previous projects. One
- 9:44:45would be communication barriers. By
- 9:44:47using multiple communication channels,
- 9:44:49you're able to actually break down a lot
- 9:44:52of those barriers, make sure it works
- 9:44:54best for that particular stakeholder.
- 9:44:57Lack of alignment or conflicting
- 9:45:00interest. By minimizing these, have a
- 9:45:03clear stakeholder strategy plan. Lack of
- 9:45:06engagement. This has honestly been the
- 9:45:09biggest one that I've run into with very
- 9:45:11large stakeholders like leadership.
- 9:45:13either it's the customer leadership,
- 9:45:15personal leadership, make sure to
- 9:45:18provide regular updates, engage the
- 9:45:20stakeholders when needed and in a
- 9:45:23meaningful way. So, if it's a decision-m
- 9:45:26process that's going to really impact a
- 9:45:28project, pull them in.
- 9:45:31In my experience, the biggest problem
- 9:45:33that I've had in dealing with and
- 9:45:35working with stakeholders has been um
- 9:45:38stakeholders feeling like um the the
- 9:45:42people involved in the project um are
- 9:45:46working against each other. So there's a
- 9:45:48lot of lot of times where you're working
- 9:45:50on a project and one stakeholder will
- 9:45:52have a specific point of view or a
- 9:45:54specific set of goals and that point of
- 9:45:56view or those goals are opposite or
- 9:45:59different than other stakeholders on the
- 9:46:01team. So you know in those situations
- 9:46:04you know what you what you try to what I
- 9:46:06try to do is really try to find that
- 9:46:08common ground. Um you know go back to
- 9:46:12first principles. What are we what are
- 9:46:13we building this for? So, it's it's
- 9:46:15using those techniques to really try to
- 9:46:18get people to work in the same direction
- 9:46:20rather than seeing um each person on the
- 9:46:23team as antagonistic. And and if you do
- 9:46:26encounter a situation where you can't
- 9:46:28get your stakeholders to agree, that's
- 9:46:30probably time to bring it to the next
- 9:46:32level of conversation with, you know,
- 9:46:34upper management or with other people
- 9:46:36that can help make those decisions.
- 9:46:39[Music]
- 9:46:49Welcome to monitor stakeholder
- 9:46:50engagement and ground rules. After
- 9:46:53watching this video, you will be able to
- 9:46:56summarize methods to maintain
- 9:46:58stakeholder support, describe the
- 9:47:00Tuckman ladder and situational
- 9:47:02leadership model, and recognize key
- 9:47:05motivation theories to shape stakeholder
- 9:47:07engagement strategies.
- 9:47:09Maintaining stakeholder support and
- 9:47:11commitment through the planning and
- 9:47:13execution of a project can be difficult.
- 9:47:17The project manager should always
- 9:47:19collaborate effectively to keep
- 9:47:20stakeholders moving in a positive
- 9:47:23direction. A project manager must be
- 9:47:25able to organize the project, be an
- 9:47:28effective communicator, be a positive
- 9:47:30influencer, and be accessible to the
- 9:47:33team and stakeholders.
- 9:47:35In 1965, Bruce Tuckman developed the
- 9:47:39Tuckman ladder, and this ladder shares a
- 9:47:41four-step process for team development.
- 9:47:44Then, Paul Hershey and Ken Blanchard
- 9:47:47developed the situational leadership
- 9:47:49model in 1982, and this model shares
- 9:47:52strategies to gain commitment and
- 9:47:55support depending on an individual's
- 9:47:57readiness state. We combine these two
- 9:48:00models to adopt a successful approach to
- 9:48:02building a team. When a team first comes
- 9:48:05together, productivity is low and it
- 9:48:08takes time to move the team to a state
- 9:48:10where productivity is high. Let's look
- 9:48:13at the stages the team moves through and
- 9:48:16how the project manager can guide the
- 9:48:18team to success. First, the team comes
- 9:48:22together in the form stage of the
- 9:48:24Tuckman ladder. Project managers should
- 9:48:26use a tell strategy of the situational
- 9:48:29leadership model by telling the team
- 9:48:31what the project is, why it's important,
- 9:48:34and explaining the roles and
- 9:48:36responsibilities of each team member.
- 9:48:39Next, in the storm stage of the latter,
- 9:48:42team members may begin to have doubts
- 9:48:44and feel the project is not a good fit
- 9:48:46for them. They may have reservations
- 9:48:49about their skills, roles, and
- 9:48:51responsibilities and questions about the
- 9:48:54project itself. Productivity is low
- 9:48:57during the storm stage. Here a project
- 9:49:00manager should employ a sell strategy of
- 9:49:03the situational leadership model by
- 9:49:05selling the team on the project and
- 9:49:08selling the team on themselves by
- 9:49:10addressing areas of doubt, answering
- 9:49:13questions and assuring team members that
- 9:49:16they have value and belong. A team can
- 9:49:19weather the storm stage. In the norm
- 9:49:22stage of the latter, the team begins to
- 9:49:24focus on project work and productivity
- 9:49:27increases. Now, the team may still have
- 9:49:30questions and some reservations. The
- 9:49:32project manager should cease using the
- 9:49:35telling and selling strategies and
- 9:49:37switch to a participation strategy by
- 9:49:40being available, accessible, and ready
- 9:49:42to support the team. Finally,
- 9:49:45productivity peaks in the perform stage
- 9:49:47of the ladder. The team can now
- 9:49:50self-organize, and self-direct
- 9:49:52themselves. The project manager should
- 9:49:54use a delegate strategy and allow the
- 9:49:57team to work independently and
- 9:49:59self-correct. And if an issue occurs,
- 9:50:02the project manager can repeat any of
- 9:50:05the rungs on the Tuckman ladder. The
- 9:50:08Project Management Institute or PMI
- 9:50:11shares four motivational theories that a
- 9:50:13project manager should understand and
- 9:50:16leverage to motivate their team. The
- 9:50:18first of the four motivational theories
- 9:50:21is the expectancy theory. The team
- 9:50:24evaluates the work depending on the
- 9:50:26level of effort it will require to
- 9:50:28accomplish it. If the potential reward
- 9:50:31justifies the level of effort, the team
- 9:50:33member performs at a high level.
- 9:50:36However, if the reward does not justify
- 9:50:38the level of effort, the team member's
- 9:50:41performance may not be adequate. The
- 9:50:44second theory is the Herzburg hygiene
- 9:50:46and motivational factors theory. This
- 9:50:49theory was developed by Frederick
- 9:50:51Herzburg who categorizes motivational
- 9:50:54factors as hygiene and motivational
- 9:50:56factors. Hygiene factors such as company
- 9:51:00policies, salary and the work
- 9:51:02environment decrease motivation if they
- 9:51:05are absent and motivational factors such
- 9:51:08as achievement, growth and advancement
- 9:51:11opportunities increase motivation when
- 9:51:13they are present. Now the third theory
- 9:51:16is intrinsic versus exttrinsic
- 9:51:19motivation. Daniel Pink developed this
- 9:51:22theory in which he categorizes
- 9:51:24motivational factors as being either
- 9:51:27exttrinsic or intrinsic. Exttrinsic
- 9:51:30motivators are short-term and diminish
- 9:51:33over time such as salary. Intrinsic
- 9:51:36motivators are broken into three
- 9:51:38categories. Autonomy, which is the
- 9:51:41desire to direct one's own life.
- 9:51:43Mastery, which is the ability to
- 9:51:45improve, learn, and excel. and purpose
- 9:51:49which is the need and desire to make a
- 9:51:52difference. And finally, the fourth
- 9:51:54theory is the theory of needs. David
- 9:51:58Mlelen states that people are generally
- 9:52:00motivated by three needs, achievement,
- 9:52:03power, and affiliation. And the strength
- 9:52:07of these three needs in an individual
- 9:52:09varies depending on the individual's
- 9:52:12experiences, values, and culture.
- 9:52:16In this video, you learned that a
- 9:52:18project manager must be able to organize
- 9:52:21the project, be an effective
- 9:52:23communicator, be a positive influencer,
- 9:52:26and be accessible to the team and
- 9:52:29stakeholders. The Tuckman ladder model
- 9:52:31states the team's move through the form,
- 9:52:34storm, norm, and perform stages. A
- 9:52:37project manager employs the situational
- 9:52:40leadership model, the tell, sell,
- 9:52:42participate, and delegate strategies
- 9:52:45through each ladder stage to keep their
- 9:52:47team on task. And the four motivational
- 9:52:50theories are the expectancy theory, the
- 9:52:53Herzburg hygiene and motivational
- 9:52:55factors theory, the intrinsic versus
- 9:52:58exttrinsic motivation theory, and the
- 9:53:00theory of needs.
- 9:53:05[Music]
- 9:53:13Welcome to expert viewpoints ground
- 9:53:16rules and norms. In this video, we will
- 9:53:19hear from project managers discussing
- 9:53:20ground rules and norms. They explain
- 9:53:23when using ground rules is most
- 9:53:24beneficial, examples of successful
- 9:53:27implementation of ground rules and norms
- 9:53:29and advice for when stakeholders fail to
- 9:53:31follow ground rules and norms.
- 9:53:34Well, the Project Management Institute
- 9:53:36came up with a tool called a team
- 9:53:38charter. And within this team charter,
- 9:53:41they define six different areas where
- 9:53:44ground rules and norms are probably
- 9:53:46quite important. I want to go ahead and
- 9:53:49pick the two that I think are really
- 9:53:51important. Number one, meeting norms.
- 9:53:54Let's be honest, meetings are a huge
- 9:53:56time waster. Try to get with your team
- 9:54:00and determine what are norms and ground
- 9:54:03rules that will ensure that your team
- 9:54:06applies effective meeting management.
- 9:54:08Here's a couple of quick examples.
- 9:54:10Number one, publish an agenda.
- 9:54:13A meeting without an agenda is like a
- 9:54:16journey without a road map. And publish
- 9:54:20the minutes. Ensure there is a record of
- 9:54:22discussions and action items. Without
- 9:54:25minutes, you may very well encounter a
- 9:54:27term that I like to refer to as
- 9:54:29selective amnesia. What does selective
- 9:54:32amnesia means? It means that the next
- 9:54:34day, the individual who made commitments
- 9:54:36at the meeting has no understanding or
- 9:54:38remembrance of the commitments that they
- 9:54:40made. I want to go ahead and close out
- 9:54:43meeting ground rules with a rule that I
- 9:54:46was informed of that I really think is
- 9:54:49good. It's the rule of 48 and 24. Get
- 9:54:52the agenda out 48 hours ahead of time.
- 9:54:55Why 48 hours? It gives people enough
- 9:54:57time to go ahead and do the pre-work and
- 9:55:00to try to understand what this meeting
- 9:55:02is all about and get the minutes out
- 9:55:04within 24 hours of the end of the
- 9:55:06meeting to avoid that selective amnesia
- 9:55:09that I just shared a moment ago. The
- 9:55:11second area, team values. I like to
- 9:55:14refer to team values sometimes as the
- 9:55:16elephant in the room.
- 9:55:19Ensure you treat each other with
- 9:55:21respect. And here's the key. Respect may
- 9:55:24mean different things to different
- 9:55:25people. When you're determining what
- 9:55:27those ground rules and norms are, define
- 9:55:30what respect means to the team. What
- 9:55:33does it mean to the group? Come up with
- 9:55:35a standard definition that everyone can
- 9:55:37agree upon. Avoid hurtful and derogatory
- 9:55:41language. Some people may think they're
- 9:55:43very funny, but sometimes language can
- 9:55:46be very, very painful. Try to determine
- 9:55:48what those boundaries are and where you
- 9:55:51don't want to cross those particular
- 9:55:53boundaries. Be inclusive and treat
- 9:55:56everyone equitably and embrace
- 9:55:59diversity. Don't fight it. These are
- 9:56:03very important ground rules, meetings
- 9:56:05and team values that I think if you
- 9:56:07hammer out and everyone can come up with
- 9:56:10an agreement on the team, I think you'll
- 9:56:13progress very very well through the
- 9:56:14project.
- 9:56:16Whenever I start a project, I like to
- 9:56:18really make sure to set the expectations
- 9:56:21and to be clear at the very beginning
- 9:56:24and to prevent any ambiguity where
- 9:56:26everybody is concerned or stressed. We
- 9:56:29don't want that at the beginning of a
- 9:56:30project. So, I will typically go ahead
- 9:56:33and have one-on- ones with each
- 9:56:35individual preset expectation,
- 9:56:37especially with communication, and then
- 9:56:39redo that again as a whole teams just to
- 9:56:42make sure everybody understands. It
- 9:56:45gives them the opportunity for Q&A as
- 9:56:47well.
- 9:56:49>> Well, I mentioned that team charter
- 9:56:50document just a couple of minutes ago. A
- 9:56:53team charter is a document that defines
- 9:56:55ground rules and norms in six key areas.
- 9:56:58So, now I'll give you the project
- 9:57:00management institutees six areas. Those
- 9:57:03six areas that you want to consider
- 9:57:04having ground rules and norms in are
- 9:57:07team values, which we talked about a
- 9:57:09second ago. Communications guidelines.
- 9:57:12What's an example of that? Perhaps for
- 9:57:15emails if it is urgent we will put
- 9:57:18urgent in the subject line and everyone
- 9:57:20will agree to get back within 24 hours.
- 9:57:23Decision making process and criteria.
- 9:57:26How are decision make how are decisions
- 9:57:29going to be made? Is there a process and
- 9:57:31how can you be inclusive in that
- 9:57:33particular process? Conflict resolution
- 9:57:36process. Conflict means people have a
- 9:57:39different idea, different thoughts,
- 9:57:41different opinions. When that occurs,
- 9:57:43how do we resolve them? We talked just a
- 9:57:46minute ago about meeting guidelines.
- 9:57:48Definitely that rule of 4824 is one of
- 9:57:50my favorites. And team agreements. What
- 9:57:53do we agree to do in terms of supporting
- 9:57:56each other?
- 9:57:58>> Sometimes we'll have stakeholders who
- 9:58:01say, "Yeah, yeah, I'll do it." Or, "I
- 9:58:03totally agree with everything." And all
- 9:58:05of a sudden you see that they're not
- 9:58:07really participating or they're not
- 9:58:09agreeing to your ground rules. What you
- 9:58:12need to do first is have a one-on-one
- 9:58:15with them. Reset those expectations and
- 9:58:18to find out why they're not agreeing to
- 9:58:20it or what is going on. Is there
- 9:58:22something else in the background? For
- 9:58:24example, they don't have enough training
- 9:58:26or something like that. Find out the why
- 9:58:29addition to resetting those
- 9:58:30expectations. If that doesn't work out
- 9:58:33and you have taken the time to really
- 9:58:36push those ground rules and make sure
- 9:58:38that they understand they have all the
- 9:58:40training, then you need to go to
- 9:58:42management. Sometimes you actually do
- 9:58:43need to escalate as well.
- 9:58:47[Music]
- 9:58:55Hello everyone. For the next couple of
- 9:58:58minutes, we want to take a moment to
- 9:59:00review a key tool and technique that is
- 9:59:03used in project management called a team
- 9:59:05charter. We're going to quickly review a
- 9:59:08team charter process, share with you a
- 9:59:11template that was developed by the
- 9:59:12project management institute, and
- 9:59:14provide you some examples of norms and
- 9:59:17ground rules that you may want to
- 9:59:19include in your team charter. As a quick
- 9:59:22review, the goal of a team charter is to
- 9:59:25develop team norms and ground rules to
- 9:59:28guide effective project team behavior.
- 9:59:32To build and develop a team charter, use
- 9:59:36a four-step approach. Step number one is
- 9:59:39brainstorming. Any member on the team
- 9:59:42can propose a norm and ground rule at
- 9:59:45any time. Once a norm and ground rule is
- 9:59:48proposed, have a vote. Ask the entire
- 9:59:52team to put their thumbs up if they
- 9:59:55agree with the ground rule or norm, put
- 9:59:58their thumbs down if they disagree with
- 10:00:00the norm or ground rule, and put their
- 10:00:03thumb sideways if they want to have more
- 10:00:05conversation or discussion regarding the
- 10:00:08proposal.
- 10:00:10Step number three is finalize all agreed
- 10:00:13upon entries. only put those norms and
- 10:00:17ground rules in the team charter where
- 10:00:20everyone ultimately agrees that they can
- 10:00:24follow and commit to that norm and
- 10:00:26ground rule. Once the conversation is
- 10:00:29complete and all of the norms and ground
- 10:00:31rules have been included, each team
- 10:00:34member should sign the team charter and
- 10:00:36the project manager should maintain the
- 10:00:39signed team charter for any future
- 10:00:42reference.
- 10:00:43Of note, this is not a formal project
- 10:00:47management plan entry. A team charter is
- 10:00:50a document that belongs to the team. It
- 10:00:53need not be shared outside of the team.
- 10:00:57Now, let's turn our attention to the
- 10:01:00template and format of a team charter.
- 10:01:03The project management institute
- 10:01:05developed a team charter format that
- 10:01:07includes six categories of norms and
- 10:01:11ground rules. Let's briefly walk through
- 10:01:13each one and share some examples. The
- 10:01:16first category is team values. We
- 10:01:20already have a potential norm and ground
- 10:01:22rule included in this team charter. Show
- 10:01:25respect for others opinions. Allow them
- 10:01:27the opportunity to finish their thoughts
- 10:01:29without interruption.
- 10:01:31If this particular norm and ground rule
- 10:01:34was proposed by a team member, we would
- 10:01:37have the discussion. If everyone
- 10:01:39eventually after discussion put their
- 10:01:42thumbs up and agreed to commit to this
- 10:01:44norm, then it becomes part of the team
- 10:01:47charter. What's another example of a
- 10:01:50potential norm that might fit under this
- 10:01:54particular
- 10:01:55heading of team values? Avoid the use of
- 10:01:59disrespectful or hurtful language.
- 10:02:01Again, a team member would propose this
- 10:02:03norm. conversation would entail. And if
- 10:02:07you can get 100% thumbs up among the
- 10:02:10team, then this norm is listed in the
- 10:02:13team charter. And once it is listed,
- 10:02:16everyone on the team agrees to go ahead
- 10:02:19and commit to following this particular
- 10:02:22norm or ground rule. The second category
- 10:02:25is communications guidelines. Brief
- 10:02:28example, commit to replying to all
- 10:02:30urgent emails within 24 hours. That's
- 10:02:34personally one of my favorite norms.
- 10:02:36What would be another potential example
- 10:02:39of a norm in this area? Develop a
- 10:02:42communications management plan and
- 10:02:43commit to follow it. Third category,
- 10:02:47decision-making criteria and process. An
- 10:02:51example, inform the team of all
- 10:02:53management decisions impacting the
- 10:02:55project prior to execution when
- 10:02:57possible. What's another potential
- 10:03:00example in this category?
- 10:03:03Define the decision-making criteria
- 10:03:05ahead.
- 10:03:07Conflict resolution is the fourth
- 10:03:09category proposed by the project
- 10:03:11management institute. An example of a
- 10:03:14norm or ground rule in this category.
- 10:03:16Share thoughts and opinions without fear
- 10:03:19of repercussion.
- 10:03:20What's another potential example that
- 10:03:23could fit into this particular category?
- 10:03:26Work to find a compromise as much as
- 10:03:29possible.
- 10:03:30The next category is meeting guidelines.
- 10:03:34Start every meeting with an agenda.
- 10:03:36Stick to the agenda. Another potential
- 10:03:39example in this category could be
- 10:03:41publish your meeting minutes within 24
- 10:03:44hours. Finally, team agreements. An
- 10:03:48example of a norm. Let the team know if
- 10:03:50a commitment cannot be met before the
- 10:03:52commitment is due. Another potential
- 10:03:55norm that you may want to include in
- 10:03:57this area is do not commit to work you
- 10:04:00cannot fulfill.
- 10:04:03Once the team charter is complete, once
- 10:04:06all proposed norms and ground rules have
- 10:04:08been approved 100% by the team, the team
- 10:04:11charter is now ready for implementation.
- 10:04:15And what do we mean ready for
- 10:04:16implementation? It means that every
- 10:04:19member of the team is aware of these
- 10:04:21norms and ground rules and willing to go
- 10:04:24ahead and abide by them and commit to
- 10:04:26following through on each and every one
- 10:04:28of them. We hope that you will use a
- 10:04:32team charter to go ahead and define
- 10:04:34norms and ground rules for your team and
- 10:04:37we look forward to future demos. Thank
- 10:04:40you.
- 10:04:42[Music]
- 10:04:51Welcome to project risk management
- 10:04:53overview. After watching this video, you
- 10:04:56will be able to identify the need for
- 10:04:59effective project risk management.
- 10:05:01Describe the steps in the project risk
- 10:05:03management life cycle. List five primary
- 10:05:06reasons that lead to project failure and
- 10:05:09explain key project risk management
- 10:05:11roles and their responsibilities.
- 10:05:15Risk is any event that can impact a
- 10:05:17project. For example, miscommunication
- 10:05:20among team members might introduce a
- 10:05:23project delay. Recent productive project
- 10:05:25management statistics reveal that over
- 10:05:2850% of projects fail. A prominent reason
- 10:05:31for project failure is allowing risk to
- 10:05:34manage you rather than you managing the
- 10:05:37risk. The project manager and team must
- 10:05:40be aware of impacts on the project. Now,
- 10:05:44every project has a level of uncertainty
- 10:05:47and these uncertainties can lead to five
- 10:05:49primary reasons that may cause a project
- 10:05:52to fail. They include failure to achieve
- 10:05:55an on-time product or service delivery,
- 10:05:58cost overruns that negate project value,
- 10:06:01inability to achieve project objectives
- 10:06:04developed when the project was approved,
- 10:06:06failure to satisfy requirements as
- 10:06:09stated by customers and key
- 10:06:10stakeholders, and delivering products or
- 10:06:13services with little or no value at
- 10:06:16project end. The Project Management
- 10:06:19Institute or PMI states, "An effective
- 10:06:22riskmanagement program can increase
- 10:06:25chances of a successful project by 90%."
- 10:06:29PMI shares a five-step approach or life
- 10:06:32cycle to manage project risk. Plan risk,
- 10:06:36identify risk, analyze, respond, and
- 10:06:39control. In this approach, the first
- 10:06:41step is plan risk. In this step, the
- 10:06:44project manager creates a riskmanagement
- 10:06:47plan and this plan provides an overview
- 10:06:49of how risk management will be
- 10:06:51accomplished for the project. Note that
- 10:06:54another video covers the riskmanagement
- 10:06:56plan in detail. The next step is to
- 10:06:59identify risk. So the project manager
- 10:07:02and team develop a risk register. The
- 10:07:05risk register documents all risks
- 10:07:08identified using a method called risk
- 10:07:10metal language. Risk metal language
- 10:07:13provides a three-part structured
- 10:07:15description of a risk which includes
- 10:07:17cause, risk, and effect. Again, a
- 10:07:20different video covers risk metal
- 10:07:22language in more detail. The third step
- 10:07:25in the project risk management life
- 10:07:27cycle is analyze. Each risk must be
- 10:07:30analyzed in a qualitative and
- 10:07:32quantitative manner. Analysis is
- 10:07:35essential as all risks do not have
- 10:07:37similar impact potential. After analyze
- 10:07:41comes respond. The project manager and
- 10:07:44team develop risk responses and some
- 10:07:46responses may be implemented before risk
- 10:07:49occurs while others may be implemented
- 10:07:52after the fact. And finally, control.
- 10:07:55Risks must be continually reviewed and
- 10:07:58controlled through project end.
- 10:08:00Remember, risk is not a one-time
- 10:08:03occurrence.
- 10:08:04Successful project risk management
- 10:08:07depends on establishing a team and this
- 10:08:09team should be compromised of different
- 10:08:11roles including a project manager, risk
- 10:08:15owner, sponsor and subject matter expert
- 10:08:18or SMEI. Let's look at responsibilities
- 10:08:21for each role. The project manager must
- 10:08:24be part of the risk management team. The
- 10:08:26project manager is responsible for
- 10:08:29managing project risk management program
- 10:08:31activities including planning,
- 10:08:33implementing, monitoring and
- 10:08:35controlling. The risk owner is
- 10:08:37responsible for managing an identified
- 10:08:40risk. A risk owner analyzes the risk,
- 10:08:43determines risk priority, develops and
- 10:08:46manages responses, and monitors and
- 10:08:49controls the risk. A sponsor approves
- 10:08:52the risk management plan for the
- 10:08:53project. A sponsor also approves,
- 10:08:56designates, and authorizes reserves.
- 10:08:58Reserves refer to the contingency funds
- 10:09:01that may be used if a risk response
- 10:09:03requires funding. And finally, the SMEI
- 10:09:07is a stakeholder who can be consulted
- 10:09:09for any technical aspects of a risk.
- 10:09:12In this video, you learned that
- 10:09:14effective risk management can help with
- 10:09:17preventing project failure. Five reasons
- 10:09:20a project may fail include failure to
- 10:09:22meet schedule, cost overruns, inability
- 10:09:25to achieve objectives, failure to
- 10:09:28satisfy requirements, and delivering
- 10:09:30little or no value. The five steps in
- 10:09:33the project risk management life cycle
- 10:09:36include plan risk, identify risk,
- 10:09:39analyze, respond, and control. And a
- 10:09:42project risk management team should
- 10:09:44include a project manager, risk owner,
- 10:09:47sponsor, and SME.
- 10:09:52[Music]
- 10:10:00Welcome to risk defined. After watching
- 10:10:03this video, you will be able to describe
- 10:10:06key takeaways from PMI's uncertainty
- 10:10:08performance domain. Explain risk
- 10:10:11categories, describe risk types, and
- 10:10:14define the term issue. So, as discussed
- 10:10:17in another video, risk is defined as any
- 10:10:20potential event that can impact a
- 10:10:22project positively or negatively. For
- 10:10:25example, every person on the project
- 10:10:28uses a computer and there is a
- 10:10:30possibility that some computers may not
- 10:10:32have all the required software loaded.
- 10:10:35So, this will limit accessibility.
- 10:10:38This is a risk, a potential event. PMI
- 10:10:42added the uncertainty performance domain
- 10:10:44in the project management body of
- 10:10:46knowledge or pinbook to address
- 10:10:48activities and functions associated with
- 10:10:51risk and uncertainty. Here are some key
- 10:10:53takeaways. The current business
- 10:10:55environment is filled with uncertainty.
- 10:10:58Technical, social, political, market,
- 10:11:00and economic events can impact a
- 10:11:03project. A project manager and team must
- 10:11:06proactively identify potential events
- 10:11:08that can impact a project and plan
- 10:11:11accordingly. There are multiple
- 10:11:13variables in a project and every action
- 10:11:16you take may have an impact on different
- 10:11:19aspects of the project. You must
- 10:11:21identify cause and effect variables for
- 10:11:24every aspect. All risks are not equal.
- 10:11:28Some risks have greater potential than
- 10:11:30others to impact the project. Constant
- 10:11:33analysis and prioritization are key.
- 10:11:36Conditions impacting a project will
- 10:11:38likely change. Effective risk management
- 10:11:41is critical from project beginning to
- 10:11:43end. Remember, effective risk management
- 10:11:46identifies both positive and negative
- 10:11:49events and risk can impact both
- 10:11:52schedules and budget. Closely monitor
- 10:11:54the plan schedule and budget reserve.
- 10:11:58Now based on their impact on the
- 10:12:00project, we can broadly categorize risks
- 10:12:02into threats and opportunities. A risk
- 10:12:06with a negative impact is referred to as
- 10:12:08a threat. When a threat occurs, it can
- 10:12:11have a negative impact on scope,
- 10:12:13schedule, and budget. The project
- 10:12:16manager and team need to identify and
- 10:12:19plan for potential threats to ensure
- 10:12:21minimal impact on the project. Now, when
- 10:12:24a risk has a positive impact, it is
- 10:12:26called an opportunity. And there may be
- 10:12:29potential events that can lead to
- 10:12:31positive impacts, such as the ability to
- 10:12:34add product functionality, accelerate
- 10:12:36schedules, or cost savings. Effective
- 10:12:39risk management looks for potential
- 10:12:41opportunities to improve project
- 10:12:44performance. Risks can be divided into
- 10:12:47two types, known and unknown. Known
- 10:12:50risks are risks the project management
- 10:12:52team and stakeholders have identified.
- 10:12:55If a threat or an opportunity has been
- 10:12:57identified by the team, it will be a
- 10:13:00known risk. Unknown risks are those yet
- 10:13:03to be identified. Any unidentified
- 10:13:05threat or opportunity is an unknown
- 10:13:08risk. A key goal of project risk
- 10:13:11management is to identify as many risks
- 10:13:14as you can before they occur. This
- 10:13:17includes both threats and opportunities.
- 10:13:20The sooner you identify a risk and make
- 10:13:22it known, the sooner you can develop
- 10:13:24appropriate responses to address it.
- 10:13:27Now, managing risks is critical to the
- 10:13:30success of a project and risk management
- 10:13:32begins on day one of the project. Risks
- 10:13:36are identified and documented as
- 10:13:38planning progresses and are initially
- 10:13:40identified during the project charter
- 10:13:42development process. Additional risks
- 10:13:45are identified during scope, schedule,
- 10:13:47and budget planning. Support planning
- 10:13:50will also likely lead to additional risk
- 10:13:52identification. Note, another video
- 10:13:55covers the end-to-end risk planning
- 10:13:57process and associated activities. All
- 10:14:00identified risks must be added to a risk
- 10:14:03register. The risk register is a
- 10:14:06document used to add and track risks.
- 10:14:08The risk register also includes
- 10:14:11information such as the likelihood of
- 10:14:13the risk occurring and risk impact. And
- 10:14:16the risk register should be updated
- 10:14:18every time a risk is identified. If a
- 10:14:22risk becomes an actual event, it is
- 10:14:25referred to as an issue and the project
- 10:14:27manager must keep track of issues in an
- 10:14:30issue log. An issue log is a document
- 10:14:33containing a list of issues along with
- 10:14:35details required to track the issue such
- 10:14:38as issue description, current status,
- 10:14:41and priority. Note that another video
- 10:14:44covers issue logs in detail.
- 10:14:47In this video, you learned that risk is
- 10:14:50an inherent part of any project that is
- 10:14:52impacted by many variables. Project
- 10:14:55managers should identify positive and
- 10:14:57negative risks and prioritize how to
- 10:15:00handle them. based on their potential
- 10:15:02impact on budget and schedule. Two
- 10:15:05categories of risk include threat, which
- 10:15:08has a negative impact on the project,
- 10:15:10and opportunity, which has a positive
- 10:15:12impact on the project. Two types of risk
- 10:15:15include known risks, which have been
- 10:15:18identified by the project manager, and
- 10:15:21unknown risks, which have not yet been
- 10:15:23identified. And if a risk becomes an
- 10:15:26actual event, it is called an issue.
- 10:15:31[Music]
- 10:15:38Welcome to risk metal language. After
- 10:15:41watching this video, you will be able to
- 10:15:44explain the need for a risk metal
- 10:15:46language statement, identify parts of
- 10:15:48the risk metal language statement, and
- 10:15:51describe parts of the risk metal
- 10:15:53language statement. Documenting risks is
- 10:15:56mandatory and the quality of the risk
- 10:15:58statement is equally important. For
- 10:16:01example, consider the risk statement
- 10:16:03weather is unpredictable. This risk
- 10:16:05statement is ambiguous and does not
- 10:16:08provide a clear view of why the
- 10:16:10unpredictability is a risk or what will
- 10:16:13happen if the weather changes. An
- 10:16:15ambiguous statement can be difficult to
- 10:16:18decipher and this can result in a
- 10:16:20project manager taking an incorrect
- 10:16:22action to manage the risk. Now risk
- 10:16:25metal language is an industry best
- 10:16:28practice that helps with writing
- 10:16:29unambiguous and accurate risk
- 10:16:32statements. The risk metal language
- 10:16:34breaks the risk statement into three
- 10:16:36parts cause event and impact. The
- 10:16:40project management institute or PMI does
- 10:16:43not define risk metal language by name.
- 10:16:46However, PMI states that the initial
- 10:16:49risk entries in a risk register should
- 10:16:52include risk cause and effect
- 10:16:54statements. Part one of the risk metal
- 10:16:56language maps to cause. Parts two and
- 10:17:00three constitute the effect and
- 10:17:02subsequent impact. The metal language
- 10:17:05structure has three parts. So let's
- 10:17:07understand each part in detail. The
- 10:17:10first part of the structure is risk
- 10:17:12cause. Risk cause is a situation or
- 10:17:16condition that exists. Bad weather and
- 10:17:19good weather are two examples of risk
- 10:17:21cause. Event is the second part. Event
- 10:17:25defines what can potentially occur due
- 10:17:28to the cause. For example, bad weather
- 10:17:30could result in rain and in this
- 10:17:32example, rain is the event. And
- 10:17:35similarly, good weather may result in
- 10:17:38sunshine and sunshine is the event. The
- 10:17:41last part of risk metal language is
- 10:17:44impact. Impact answers the question, why
- 10:17:47does the event matter? Now, using the
- 10:17:50weather example, the impact of rain may
- 10:17:53result in a delay in external work and
- 10:17:56schedules may slip. The impact of
- 10:17:58sunshine, however, may allow the team to
- 10:18:01work longer and make up for any loss
- 10:18:04time due to the rain. Let's now rewrite
- 10:18:07the statement weather is unpredictable
- 10:18:10in a way that it will appear in the risk
- 10:18:12register.
- 10:18:14In this video, you learned that
- 10:18:16ambiguous risk statements can result in
- 10:18:19confusion and chaos. Risk metal language
- 10:18:22provides a structure to develop risk
- 10:18:25statements. And risk metal language
- 10:18:27breaks the risk into three parts. Cause
- 10:18:31which is a situation or condition that
- 10:18:33exists. Event which defines what can
- 10:18:36potentially occur due to the cause and
- 10:18:40impact which provides a response to the
- 10:18:42question why does the event matter?
- 10:18:46[Applause]
- 10:18:48[Music]
- 10:18:56Hello everyone and welcome to a quick
- 10:18:58demonstration on a SWAT analysis. SWAT
- 10:19:02stands for strengths, weaknesses,
- 10:19:05opportunities, and threats. A SWAT
- 10:19:07analysis is a very commonly used risk
- 10:19:10identification tool. Let's begin with a
- 10:19:13quick definition of strengths,
- 10:19:16weaknesses, opportunities, and threats.
- 10:19:18Let's begin with strengths and
- 10:19:20opportunities. A strength in SWAT refers
- 10:19:23to internally controlled features that
- 10:19:25are positive. Opportunities in SWAT
- 10:19:29result from existing strengths and
- 10:19:31document external events that may occur
- 10:19:34as a result. Turning our attention to
- 10:19:37weaknesses and threats. Weaknesses in
- 10:19:40SWAT refer to internally controlled
- 10:19:42factors that are negative and threats in
- 10:19:44SWAT result from existing weaknesses and
- 10:19:47document external events that may occur
- 10:19:50as a result. Today for this SWAT
- 10:19:53analysis demonstration, we're going to
- 10:19:55feature a process improvement project. A
- 10:19:58team gathered together and identified
- 10:20:01two strengths and associated
- 10:20:03opportunities and two weaknesses and
- 10:20:05associated threats. Let's take a look at
- 10:20:08what they identified.
- 10:20:13The first strength that the team
- 10:20:15identified was a reliable supply chain.
- 10:20:19Now you may be asking yourself, how is
- 10:20:22this an internal consideration?
- 10:20:26You're the organization. You determine
- 10:20:28who is going to partner with you in the
- 10:20:31supply chain. If the supply chain is
- 10:20:33satisfactory, you are empowered to go
- 10:20:36ahead and maintain these partnerships.
- 10:20:39If the supply chain is not satisfactory,
- 10:20:42you are empowered to go ahead and
- 10:20:44change. The second strength that was
- 10:20:47identified by the team was
- 10:20:52high customer satisfaction. So we had
- 10:20:55two strengths. The next step was to take
- 10:20:57a look and determine what are the
- 10:21:00external opportunities that may result
- 10:21:02from these two strengths. So we take a
- 10:21:05look first of all at the reliable supply
- 10:21:08chain. The teams determined that with
- 10:21:11this reliable supply chain there was a
- 10:21:13high potential for supplier willingness
- 10:21:16to adapt to any improvements and changes
- 10:21:18that were made.
- 10:21:20The high customer satisfaction was
- 10:21:23analyzed and the team determined that
- 10:21:26based on this high customer
- 10:21:28satisfaction, the customers may be
- 10:21:30willing to partner with us and hopefully
- 10:21:34expedite the implementation of any
- 10:21:36improvements. A win-win situation for
- 10:21:39the organization and the customer.
- 10:21:42However, there were two weaknesses that
- 10:21:44were identified by the team as well. The
- 10:21:47first weakness that was identified was
- 10:21:49there were many manual operations in the
- 10:21:52current process. And the second was
- 10:21:56there was employee complacency.
- 10:21:59Their employees had learned to live with
- 10:22:04a very ineffective and very inefficient
- 10:22:07process.
- 10:22:09The next step was to evaluate the
- 10:22:11threats. They took a look once again at
- 10:22:13many manual operations and determined
- 10:22:16that the primary threat was limited
- 10:22:18improvement opportunities. As a result
- 10:22:21of the manual operations, many of the
- 10:22:24improvement solutions may not be able to
- 10:22:27be implemented. And for employee
- 10:22:30complacency, they took a look and
- 10:22:33determined that
- 10:22:35there might be some resistance to
- 10:22:37change.
- 10:22:39They completed their SWAT analysis and
- 10:22:41then went to the next step. They took
- 10:22:44their strengths and opportunities,
- 10:22:46weaknesses and threats, and they
- 10:22:48completed their risk register. After
- 10:22:50they documented the information that
- 10:22:53they had attained during the SWAT
- 10:22:55analysis, they defined the impact of
- 10:22:58each of the opportunities and impact of
- 10:23:00each of the threats. They assigned
- 10:23:03probability and impact numbers to each
- 10:23:05opportunity and each threat and
- 10:23:07calculated a risk score.
- 10:23:10This concludes our brief overview of
- 10:23:13SWAT analysis. Hopefully, you have
- 10:23:16gained a better understanding of SWAT
- 10:23:19analysis, its purpose, and the
- 10:23:22methodology to go ahead and complete
- 10:23:24this analysis. Thank you for your
- 10:23:26attention, and we look forward to seeing
- 10:23:28you in future demos.
- 10:23:32[Music]
- 10:23:40Welcome to the risk management plan.
- 10:23:43After watching this video, you will be
- 10:23:45able to define the purpose of a
- 10:23:47riskmanagement plan and describe the
- 10:23:50different sections of a riskmanagement
- 10:23:52plan. A riskmanagement plan describes
- 10:23:55how riskmanagement activities will be
- 10:23:58structured and performed for the
- 10:24:00project. The riskmanagement plan
- 10:24:02provides instructions and a roadmap for
- 10:24:05how risk management for a project will
- 10:24:07be conducted. After the riskmanagement
- 10:24:10plan is approved, it becomes part of the
- 10:24:13overall project management plan. Now the
- 10:24:16risk management plan contains different
- 10:24:19sections and these include risk
- 10:24:21management team definitions of
- 10:24:23probability and impact probability and
- 10:24:26impact matrix risk assessment schedule
- 10:24:29risk contingency reserves and
- 10:24:32clarification and comments. Let's look
- 10:24:35at each of these in detail. The risk
- 10:24:38management plan should have details
- 10:24:40about the risk management team. This
- 10:24:43list includes responsibilities for
- 10:24:45different roles including the project
- 10:24:47manager, risk owner, subject matter
- 10:24:50experts or SMEES and any other
- 10:24:53stakeholder involved in overall project
- 10:24:55risk management. The risk management
- 10:24:58plan should also contain definitions for
- 10:25:01probability and impact ratings. These
- 10:25:04ratings are used to score the project
- 10:25:06risks which helps the project manager
- 10:25:08prioritize and monitor risks. Note PMI
- 10:25:12recommends using the simple Liykert
- 10:25:14scale from 1 to 5. Once definitions are
- 10:25:18complete, the project manager can
- 10:25:20determine the risk score by multiplying
- 10:25:22the probability score times the impact
- 10:25:25score. The higher the risk score, the
- 10:25:28more a risk should be monitored. This
- 10:25:30table displays an example of probability
- 10:25:33and impact ratings. Now depending on the
- 10:25:37risk score, the project manager will
- 10:25:39need to take different actions. To
- 10:25:42ensure a common structure is followed by
- 10:25:44all members of the project team, the
- 10:25:46project manager must define the
- 10:25:48probability and impact matrix. This
- 10:25:52matrix contains the risk score ranges
- 10:25:54along with associated actions. Here's a
- 10:25:57table displaying a sample matrix.
- 10:26:00Next, the project manager should also
- 10:26:03document the risk assessment schedule in
- 10:26:05the risk management plan. As part of the
- 10:26:08schedule, document when project risks
- 10:26:10will be reviewed and include status
- 10:26:13meeting requirements, status reporting
- 10:26:15requirements, and management reporting
- 10:26:18requirements. Detailed schedules should
- 10:26:21reflect in the project communications
- 10:26:23plan. Another video covers the project
- 10:26:26communications plan in detail. A
- 10:26:29riskmanagement plan should contain the
- 10:26:31definition for contingency reserves or
- 10:26:33funds required to respond to known
- 10:26:36risks. In addition, the riskmanagement
- 10:26:39plan should contain details about how
- 10:26:42reserves are maintained and distributed.
- 10:26:45The risk management plan must share the
- 10:26:47amount of reserves available and the
- 10:26:49process to access them. Note that in
- 10:26:52most cases, the project manager does not
- 10:26:55control contingency reserves or funds.
- 10:26:58In addition to contingency reserves, a
- 10:27:01project should also have a management
- 10:27:03reserve. Management reserves are funds
- 10:27:06set aside to support unknown risks which
- 10:27:09can be caused due to various reasons
- 10:27:11such as information gaps. The higher the
- 10:27:14project complexity, the more management
- 10:27:17reserves should be set aside. Now, the
- 10:27:20risk management plan can also contain an
- 10:27:22optional section for clarifications and
- 10:27:25comments. This section can be used to
- 10:27:28provide references, policy links, and so
- 10:27:31on that impact risk management planning.
- 10:27:34The project manager can also reference a
- 10:27:37risk breakdown structure if available. A
- 10:27:40risk breakdown structure is a list of
- 10:27:42potential risks that may impact projects
- 10:27:45broken out by category. The project
- 10:27:48manager can derive the risk breakdown
- 10:27:50structure by using the lessons learned
- 10:27:52on risks from other projects. And this
- 10:27:55table displays an example of the risk
- 10:27:57breakdown structure.
- 10:28:00In this video, you learned that a
- 10:28:02riskmanagement plan describes how
- 10:28:04riskmanagement activities will be
- 10:28:07structured and performed for the
- 10:28:09project. The riskmanagement plan should
- 10:28:11contain the following sections. Risk
- 10:28:14management team, which defines the
- 10:28:16riskmanagement team and their roles.
- 10:28:18Definitions of probability and impact
- 10:28:21which defines probability and impact
- 10:28:23ratings to be applied to qualify all
- 10:28:26risks. Probability and impact matrix
- 10:28:29which determines the relative priority
- 10:28:32of all risks by risk score. Risk
- 10:28:34assessment schedule to provide a
- 10:28:36schedule for risk reassessment and
- 10:28:38status analysis or reporting. Risk
- 10:28:41contingency reserves that define
- 10:28:43reserves required to respond to risk. In
- 10:28:46addition to how reserves are maintained
- 10:28:48and distributed and a clarification and
- 10:28:52comment section to provide clarifying
- 10:28:54information, links, references, and so
- 10:28:57on as required.
- 10:29:02[Music]
- 10:29:09[Music]
- 10:29:13Welcome to expert viewpoints risk
- 10:29:15planning. In this video, we will hear
- 10:29:18from project managers discussing risk
- 10:29:19planning. They explain how they normally
- 10:29:22conduct risk planning, why
- 10:29:23riskmanagement planning is necessary,
- 10:29:26how they plan for risk management, and
- 10:29:28the tools and techniques that are
- 10:29:29critical to planning success.
- 10:29:32>> The best piece of advice that I can give
- 10:29:34you is three words. Make it real. Try to
- 10:29:38go ahead and share past lessons learned
- 10:29:40where risks occurred that impacted a
- 10:29:42project negatively. In addition, try to
- 10:29:45share examples of opportunities that
- 10:29:47were lost. There's an old saying that an
- 10:29:50ounce of prevention is worth a pound of
- 10:29:52cure. If you can provide concrete
- 10:29:54examples of how risk impacted a project,
- 10:29:58then chances are pretty good that you
- 10:30:00may be able to catch those stakeholders
- 10:30:02attention.
- 10:30:04Pretty easy response. Begin on day
- 10:30:07number one of the project. As you're
- 10:30:09developing the project charter, which
- 10:30:11defines what the project is, why it's
- 10:30:14important, and who needs to be involved,
- 10:30:16do a brainstorming session with whatever
- 10:30:19stakeholders are available. What are
- 10:30:21those potential risks to this particular
- 10:30:23project. The first thing that you want
- 10:30:26to do is to define those potential risks
- 10:30:28in the project charter. Next, identify
- 10:30:31risks as you plan. Identification of
- 10:30:34risks is a very iterative process. Once
- 10:30:37you get through the project charter,
- 10:30:38you're going to begin planning scope.
- 10:30:40Then you'll begin planning your
- 10:30:42schedule. You'll begin planning your
- 10:30:43budget. As you complete each major
- 10:30:46planning section, make sure that you
- 10:30:49spend a little bit of time before you
- 10:30:51move forward and ask yourself what were
- 10:30:53some risks that were identified and
- 10:30:55continually add those to your risk
- 10:30:58register.
- 10:31:00The first thing people need to know
- 10:31:01about risk management planning is why
- 10:31:04it's important, how it affects the
- 10:31:06organization, how it affects the outcome
- 10:31:08of the project, and what the
- 10:31:10implications are for them personally by
- 10:31:13not doing this or not doing it well
- 10:31:14enough. Therefore, you need to explain
- 10:31:17why we do risk management planning. And
- 10:31:21if it's not supported by the
- 10:31:23organization, if it's not something
- 10:31:24that's part of the process of running a
- 10:31:30project or implementing something new
- 10:31:33development, then people are really not
- 10:31:36going to understand why and they're not
- 10:31:37going to be committed to doing it.
- 10:31:41So I think if people know personally how
- 10:31:43it affects them, if their job for
- 10:31:45example is in engineering and they know
- 10:31:47that the outcome of not planning for a
- 10:31:49risk could be a failure of the product,
- 10:31:52then they're going to have more
- 10:31:54incentive to pay attention and do this
- 10:31:58risk planning. So I think you need to
- 10:31:59make it part of the organizational
- 10:32:01process. It really needs to be part of
- 10:32:03everything that we do. Whenever there's
- 10:32:05a project, whenever there is a new
- 10:32:08product implemented, then it should be
- 10:32:10done across the board, across the
- 10:32:12organization. It should be something
- 10:32:14that is part of the standard process.
- 10:32:18And
- 10:32:20if management doesn't support it, then
- 10:32:22nobody else will. So if you really want
- 10:32:25to get people interested in doing this,
- 10:32:27you have to have management support. You
- 10:32:29have to have a process. And people need
- 10:32:32to understand why it's important
- 10:32:35when it comes to planning risk
- 10:32:37management and how you do it. You have
- 10:32:39to have the team involved from day one.
- 10:32:41They have to be part of that process.
- 10:32:43They have to be there when you're just
- 10:32:45brainstorming what the risks are, right?
- 10:32:48Because if you don't, then you're going
- 10:32:49to either have to go back later on and
- 10:32:51do a bunch of rework or you're going to
- 10:32:53miss it all together and then the risk
- 10:32:54occurs. it's triggered and then you have
- 10:32:58no plan in place for mitigating that
- 10:33:01risk or responding to it. The second
- 10:33:04thing is you have to have a quantitative
- 10:33:05system for
- 10:33:08identifying the risks and normally you
- 10:33:10want to look for things like
- 10:33:12detectability,
- 10:33:13severity, likelihood, right? Because we
- 10:33:16want to know how if it's going to
- 10:33:18happen, we want to know how bad it's
- 10:33:19going to be and we want to know if we
- 10:33:21can detect it at all. And the other
- 10:33:24thing is you have to be diligent about
- 10:33:27auditing these this risk management
- 10:33:29plan. And that involves having something
- 10:33:32what you may call a control plan which
- 10:33:34is a formal plan that lays out all of
- 10:33:38the uh risks and how you respond, who's
- 10:33:41responsible,
- 10:33:43you know, when we do it by. There's a
- 10:33:46there's a couple ways to do it, but
- 10:33:48normally you want to look at those
- 10:33:49things.
- 10:33:50And if you don't have any of that, then
- 10:33:53you're going to know that you're going
- 10:33:54to have a problem. Um, and also if you
- 10:33:58if you have a system of auditing in
- 10:34:00place, periodically, you can go in and
- 10:34:03evaluate whether our our risk uh
- 10:34:06measures are still valid, if the
- 10:34:08everything needs to be updated, right?
- 10:34:10Because these are living documents that
- 10:34:12we should be updating regularly.
- 10:34:15I'm going to go ahead and share three of
- 10:34:17them very briefly. Number one is a
- 10:34:20riskmanagement plan. And in a future
- 10:34:22interview, we're going to delve a little
- 10:34:24bit deeper into this risk management
- 10:34:26plan, but in essence, it's an overview
- 10:34:28of how overall risk management will be
- 10:34:31conducted. Have a plan. Plan it before
- 10:34:35you do it. Secondly, the risk register.
- 10:34:38This is a very common tool. It is a
- 10:34:40place where you list the risks. You
- 10:34:42begin by filling out the risks that you
- 10:34:45identify during the project charter. As
- 10:34:47you plan scope, you add risks to this
- 10:34:50risk register or list. As you do
- 10:34:52schedule and budget planning, you add
- 10:34:54risks. By the time you've completed all
- 10:34:56of your planning, you're probably going
- 10:34:58to have a pretty long list of risks to
- 10:35:00go ahead and manage. And the risk
- 10:35:02register is that primary document that
- 10:35:04you use to go ahead and document those
- 10:35:06risks. Last but not least, and again,
- 10:35:09we'll go ahead and explain this a little
- 10:35:10bit more in a future interview, there's
- 10:35:12another tool called a risk matrix. It's
- 10:35:15a very simple visual overview of the top
- 10:35:17risks that impact a project. You want to
- 10:35:20use this risk matrix for stakeholder and
- 10:35:24leadership presentations. And again,
- 10:35:27we'll talk to this a little bit more,
- 10:35:29but as they say, a picture is worth a
- 10:35:31thousand words.
- 10:35:33appreciate the opportunity to answer
- 10:35:34these first three questions and I'll see
- 10:35:36you again in the next riskfocused
- 10:35:40subject matter expert interview session.
- 10:35:44[Music]
- 10:35:52Hello. For the next few minutes, I would
- 10:35:54like to go ahead and share a very common
- 10:35:57tool that is used and recommended by the
- 10:36:00project management institute. This tool
- 10:36:03is called a risk register. A risk
- 10:36:06register is simply a list of risks that
- 10:36:08may be pertinent to your particular
- 10:36:11project.
- 10:36:13When completing a risk register, always
- 10:36:15begin with the project name. Today, what
- 10:36:18we're going to do is we're going to use
- 10:36:20the company picnic project as our
- 10:36:23example. And in addition, always put
- 10:36:25down the date. Today is June 11th, 20XX.
- 10:36:29Version control for a risk register is
- 10:36:32very important. We already filled in one
- 10:36:35risk for you. We will go ahead and
- 10:36:37complete a second before this demo is
- 10:36:41complete. Whenever filling in a risk,
- 10:36:44give it its own identification number.
- 10:36:47Risk number one had a problem called
- 10:36:50insects. Risk metal language says a risk
- 10:36:54should be documented in a way that tells
- 10:36:57a story, cause, event, and impact.
- 10:37:01There are insects and where there are
- 10:37:04insects, there's the potential for
- 10:37:06insect bites, and if the insect bites do
- 10:37:09occur, there is the potential for
- 10:37:11illness and discomfort.
- 10:37:14Always assign a risk owner. This
- 10:37:16individual is going to be responsible
- 10:37:19for the end-to-end management of the
- 10:37:22risk. In this particular case, the
- 10:37:24project manager. Categorization. Risks
- 10:37:27come in two categories, opportunities or
- 10:37:30threats. The probability risk rating is
- 10:37:34the chances that it will occur. Notice
- 10:37:37we have a little bit of an overview in
- 10:37:40terms of ratings from five to one. In
- 10:37:43addition, the impact risk rating. In
- 10:37:46this particular case, we give it a
- 10:37:47three. Again, on a risk register, you
- 10:37:50should have a 1 through five scale
- 10:37:52defining the impact risk rating. Risk
- 10:37:56score is risk rating times impact. 3 * 3
- 10:38:01= 9. A trigger is an early warning that
- 10:38:04the risk is about to occur. In this
- 10:38:07particular case, we're talking about
- 10:38:09insects, eye contact. If we see
- 10:38:11mosquitoes, if we see ants come
- 10:38:13approaching the picnic site, we know
- 10:38:15that this risk is about to become an
- 10:38:18issue. And we always come up with a
- 10:38:20response, which is a repellent. So now,
- 10:38:23let's go ahead and fill one out and talk
- 10:38:26about number two. So we're going to give
- 10:38:29this a new rating number two. In this
- 10:38:32particular case, we're going to say bad
- 10:38:34weather. Bad weather is our cause.
- 10:38:40What is the event that could occur?
- 10:38:42Well, if bad weather occurs, we may very
- 10:38:44well end up with some rain. And why do
- 10:38:49we care about the rain? It may result in
- 10:38:53reduced events. So now we have our risk
- 10:38:57statement. There is the potential for
- 10:39:00bad weather. And if bad weather occurs,
- 10:39:02we may end up getting some rain. And if
- 10:39:05it rains, we may have to reduce the
- 10:39:07number of events that we have at the
- 10:39:08company picnic. In this particular case,
- 10:39:11we're going to assign this risk to the
- 10:39:13project manager as well. And this is
- 10:39:16also a threat. Bad weather is not a good
- 10:39:19thing. In this particular case, we think
- 10:39:22that the probability is moderate to low.
- 10:39:24We give it a two. But the impact would
- 10:39:26be four, which is high to moderate,
- 10:39:28which is a four. In this particular
- 10:39:31case, again, we multiply 2 * 4 equals 8.
- 10:39:35So, what would be the trigger? Well, in
- 10:39:37this particular case, we're going to put
- 10:39:39down a weather report as a potential
- 10:39:42trigger. Our project manager is going to
- 10:39:45keep an eye on it. And what is going to
- 10:39:49be our potential response? Well, since
- 10:39:51we have many individuals who are
- 10:39:53attending this particular event, we're
- 10:39:55going to try to have a tent where people
- 10:39:57can go ahead and seek cover should the
- 10:40:00rain begin. One thing that I want you to
- 10:40:03notice is that we have a total risk
- 10:40:05score. As we complete each particular
- 10:40:08risk, the score adds up. In the case of
- 10:40:12a risk score, the higher the score, the
- 10:40:15more risk exposure or potential risk the
- 10:40:18project has. The lower the number, the
- 10:40:21less risk exposure as well. This
- 10:40:25concludes our overview of a risk
- 10:40:27register. Hopefully, this was clear and
- 10:40:30understandable. Thank you very much.
- 10:40:35[Music]
- 10:40:43Welcome to expert viewpoints risk
- 10:40:45management. In this video, we will hear
- 10:40:48from project managers discussing risk
- 10:40:50management.
- 10:40:51>> The answer is simple. What can you do to
- 10:40:53enhance successful risk planning and
- 10:40:55management? Step number one, develop a
- 10:40:58project riskmanagement plan. Benjamin
- 10:41:00Franklin said a long time ago, if you
- 10:41:03fail to plan, you are planning to fail.
- 10:41:05And that is true for every function
- 10:41:07within project management to include
- 10:41:09risk. What does a project management
- 10:41:11plan include? Number one, the risk team
- 10:41:14roles and responsibilities. Who are the
- 10:41:16individuals? Who are the stakeholders?
- 10:41:18Who are the team members who are going
- 10:41:19to help you to manage the project risk?
- 10:41:22Secondly, probability and impact
- 10:41:24scoring. Every risk should be assigned a
- 10:41:27probability and impact rating. In the
- 10:41:30risk management plan, we define what
- 10:41:32that rating system is going to be.
- 10:41:35Third, a probability and impact matrix.
- 10:41:38This is a classification of risk based
- 10:41:40on risk scores. Let's say for example, a
- 10:41:43risk has a probability of five and an
- 10:41:45impact of five. That results in a risk
- 10:41:48score of 25. Another risk may have a
- 10:41:50probability of one and an impact of one.
- 10:41:531* 1 equals 1. They're both risks. We
- 10:41:57need to pay attention to both of these
- 10:41:59risks. But which one are we going to
- 10:42:01spend our time on? Obviously, the one
- 10:42:04that scored 25 has a greater potential
- 10:42:07to impact the project than the one that
- 10:42:09scored one. Risk reassessment schedule.
- 10:42:12Risk is not a oneandone. Risk is often
- 10:42:16referred to as the alpha and omega of
- 10:42:18project management planning. The alpha
- 10:42:20means that you begin risk planning
- 10:42:23during the project chartering phase. And
- 10:42:25you're not complete until you've
- 10:42:26accomplished all of your planning. And
- 10:42:29even when you get into executing,
- 10:42:30controlling, and closing, new risks may
- 10:42:33go ahead and develop. How often are you
- 10:42:36going to revisit risks? The risk
- 10:42:38reassessment schedule.
- 10:42:40Sometimes another little saying, the
- 10:42:42best paid blade plans of mice and men
- 10:42:45often go astray. Well, make sure in your
- 10:42:48risk management plan you address risk
- 10:42:50contingency reserves. How many dollars
- 10:42:53are you going to have set aside just in
- 10:42:55case a risk occurs? And the final aspect
- 10:42:58of a riskmanagement plan are any
- 10:42:59comments, links, and references that you
- 10:43:01may have. Common risk management can
- 10:43:04include a lack of communication, budget
- 10:43:07and time constraints, scope creep, and
- 10:43:10scope management along with team
- 10:43:13conflict. So, you got to really make
- 10:43:15sure to build the team, have that clear
- 10:43:17communication, be realistic about your
- 10:43:20timeline and your budget, and then plan,
- 10:43:24plan, plan, understand exactly what is
- 10:43:27in scope, and avoid scope creep. First,
- 10:43:30I'll do the admin stuff. I'll go ahead
- 10:43:32and quickly add it to the issue log and
- 10:43:36assign it to someone uh either a team
- 10:43:39member or a group and then flag it in
- 10:43:42the risk register if it's not already
- 10:43:44there because sometimes that does
- 10:43:45happen. Just make sure to go ahead and
- 10:43:47add it and then work with the team or
- 10:43:50the individual to reduce the issue
- 10:43:53quickly and find a resolution at the
- 10:43:56time. This may involve your key
- 10:43:58stakeholders for a change requirement.
- 10:44:01Make sure to put a change request in.
- 10:44:03And from there, go ahead and add into
- 10:44:06lessons learned once it is complete.
- 10:44:09>> Well, first of all, you you should go to
- 10:44:10your plan. If you don't have a plan in
- 10:44:12place, then you've already lost the
- 10:44:15battle because you're not going to be
- 10:44:17able to react fast enough. You are not
- 10:44:19going to know what to do. You're going
- 10:44:22to be in crisis mode. So, the first
- 10:44:24thing is have a plan. And then once the
- 10:44:27risk is triggered, go to that plan and
- 10:44:30follow what it says because you've
- 10:44:31anticipated this. You've you've looked
- 10:44:33at this, right? So now you got to you
- 10:44:35got to work with the plan and and
- 10:44:37everybody involved really should
- 10:44:39understand that there's the plan in
- 10:44:41place already.
- 10:44:44Now what you also have to do is
- 10:44:46communicate.
- 10:44:48You should have a communication plan as
- 10:44:49part of that risk management plan. If
- 10:44:51you don't, then you're not going to have
- 10:44:53a good way of of informing people that
- 10:44:56the risk has been occurred. So, that
- 10:44:58should all be part of that. So, go to
- 10:45:01your plan and communicate. Those are the
- 10:45:04two biggest things that really you could
- 10:45:06do in a situation where a risk has been
- 10:45:08triggered. Well, first of all, you have
- 10:45:10to be disciplined. You have to build
- 10:45:12this discipline into the culture of the
- 10:45:14organization. Now, that's really hard to
- 10:45:16do. It takes time but it starts with
- 10:45:19management support. Management the
- 10:45:21organization has to support it. It may
- 10:45:24look like having an entire quality
- 10:45:26department u dedicated to doing this
- 10:45:29sort of thing. And you know it has to be
- 10:45:31more than just the project manager
- 10:45:34pushing this. It has to be the entire
- 10:45:36organization getting behind it,
- 10:45:38understanding why did we do it and why
- 10:45:41it's important. And
- 10:45:44and I always say you need to have audits
- 10:45:46in place. And if you don't uh then it's
- 10:45:50going to be really difficult to
- 10:45:51overcome. And if you're not updating
- 10:45:54your control documents, your quality
- 10:45:56documents, your risk management
- 10:45:58documents because if the market changes,
- 10:46:01if personnel change, you could have
- 10:46:03various risks that are introduced at
- 10:46:05different points in time. So you really
- 10:46:07need to have a system for updating and
- 10:46:11being on top of those things. And you
- 10:46:13have to have a good quality plan. Now a
- 10:46:15quality plan is more of a comprehensive
- 10:46:18look at risk management that involves
- 10:46:21areas outside of that as well, but it
- 10:46:24should really be incorporated into that
- 10:46:27um into that way of of doing business.
- 10:46:30Now some people do certifications like
- 10:46:33ISO which is going to force you to build
- 10:46:36those plans build that plan around
- 10:46:39everything that you do and you know
- 10:46:41that's not a bad idea because
- 10:46:44they're regularly audit audits uh
- 10:46:47regular audits by a third party and it's
- 10:46:50something that you have to do to keep
- 10:46:52that certification and a lot of
- 10:46:54companies customers are going to look
- 10:46:56for those ISO and ISO type of
- 10:46:59certification applications.
- 10:47:03[Music]
- 10:47:10>> Welcome to responding to risk. After
- 10:47:13watching this video, you will be able to
- 10:47:16identify risk response categories,
- 10:47:19describe responses to threats, explain
- 10:47:22responses to opportunities, and describe
- 10:47:25responses to both threats and
- 10:47:28opportunities.
- 10:47:29Every risk should have a response
- 10:47:31strategy. The Project Management
- 10:47:34Institute or PMI categorizes risk
- 10:47:37responses into eight distinct
- 10:47:39strategies, including three strategies
- 10:47:42to respond to threats, three strategies
- 10:47:44to respond to opportunities, and two
- 10:47:47strategies that can respond to either
- 10:47:50threats or opportunities. Every risk
- 10:47:53owner should use these strategies when
- 10:47:55creating risk responses. Now, the
- 10:47:58response strategy you choose is tied to
- 10:48:01risk metal language. Remember, every
- 10:48:04risk has a cause that leads to a
- 10:48:06potential event which leads to a
- 10:48:08potential impact. Strategies are
- 10:48:11dependent on whether or not the team can
- 10:48:14control the cause of the risk. If the
- 10:48:16cause can be controlled, certain
- 10:48:18strategies are appropriate and if not,
- 10:48:21other strategies are required. So there
- 10:48:24are three response strategies for
- 10:48:26negative risks or threats. These include
- 10:48:29avoid, transfer, and mitigate. Avoid a
- 10:48:33cause that can be controlled. For
- 10:48:35example, the project manager, risk
- 10:48:37owner, or team can easily identify and
- 10:48:41control causes such as an ineffective
- 10:48:44team member, lack of training, or manual
- 10:48:46processes. Transferring a risk to a
- 10:48:50third party is another strategy to
- 10:48:52manage threats. This strategy can be
- 10:48:54used when the project team does not have
- 10:48:56the required expertise. Then the third
- 10:48:59party will be accountable to manage the
- 10:49:02risk. Examples could be life insurance
- 10:49:05or a contract SME. And the third
- 10:49:08strategy is to mitigate. The project
- 10:49:11manager will use the mitigation strategy
- 10:49:14if the team feels they do not have any
- 10:49:16control over the cause. If a threat is
- 10:49:20identified, look at ways to reduce the
- 10:49:22probability and impact of the risk if it
- 10:49:25occurs. Examples of mitigation as a
- 10:49:28strategy include planning indoor work in
- 10:49:31the event of rain and developing
- 10:49:33workarounds to reduce the impact of new
- 10:49:36regulatory guidance. So, we've discussed
- 10:49:39the response strategies for threats.
- 10:49:42Next, let's look at response strategies
- 10:49:44for opportunities. There are three
- 10:49:47recommended strategies including
- 10:49:49exploit, share and enhance. Exploit or
- 10:49:53to take advantage of the cause that can
- 10:49:56be controlled. For example, you may be
- 10:49:59able to leverage a motivated team member
- 10:50:01or a highly trained team to improve the
- 10:50:04probability of high productivity.
- 10:50:07Sharing an opportunity with a third
- 10:50:09party is another strategy. The third
- 10:50:11party will be accountable for partnering
- 10:50:14with the project risk management team to
- 10:50:16achieve an opportunity. Examples where
- 10:50:19sharing the opportunity is beneficial
- 10:50:21could be combining orders to receive a
- 10:50:24discount or sharing expertise to achieve
- 10:50:27a mutual goal. Now there may be times
- 10:50:30when the project risk management team
- 10:50:32may not have any control over the risk
- 10:50:35cause. In this case, the only responses
- 10:50:38are to increase the probability of the
- 10:50:41opportunity occurring, increase the
- 10:50:43impact of the opportunity occurring, or
- 10:50:46increase both the probability and impact
- 10:50:48of the opportunity occurring. Let's look
- 10:50:51at some examples for responses. Consider
- 10:50:54the scenario where the schedule is fixed
- 10:50:56and you have no control to change it. In
- 10:50:59this case, you should look for ways to
- 10:51:02increase the probability of an early
- 10:51:04finish. One such strategy is to provide
- 10:51:07incentives to accelerate the schedule.
- 10:51:10Here's another situation. The team
- 10:51:12composition has been decided and cannot
- 10:51:15be changed. To increase the probability
- 10:51:18of high productivity, you can provide
- 10:51:20growth opportunities to increase
- 10:51:22motivation.
- 10:51:24Finally, response strategies that can be
- 10:51:26used for both threats and opportunities
- 10:51:29include acceptance and escalation. The
- 10:51:33acceptance strategy can be used in two
- 10:51:35scenarios. The first scenario is where
- 10:51:38the risk probability and impact are low.
- 10:51:41In this scenario, accept that the risk
- 10:51:44might occur and if it occurs, respond.
- 10:51:47The second scenario is where the risk
- 10:51:49probability and impact are not clear. In
- 10:51:52this case, the project risk management
- 10:51:55team does not have a clear acceptable
- 10:51:58response for a risk. If probability and
- 10:52:01impact are low, this is not a large
- 10:52:04problem. But if probability and impact
- 10:52:07are high, the project may need to be
- 10:52:10reassessed.
- 10:52:11Now, the escalation strategy can be used
- 10:52:14when the project manager needs to gain
- 10:52:17highlevel approval for a response,
- 10:52:19normally from the sponsor. The
- 10:52:21escalation strategy can be used if a
- 10:52:24response is either controversial or
- 10:52:27requires additional funding or reserves.
- 10:52:31In this video, you learned that the
- 10:52:33Project Management Institute or PMI
- 10:52:36categorizes risk responses into eight
- 10:52:39distinct strategies, including three
- 10:52:42strategies to respond to threats, three
- 10:52:44strategies to respond to opportunities,
- 10:52:47and two strategies that can respond to
- 10:52:50either threats or opportunities. Three
- 10:52:53response strategies for threats include
- 10:52:55avoiding risk when the cause can be
- 10:52:58controlled, transferring risk to a third
- 10:53:00party when the team does not have the
- 10:53:02expertise, and mitigating when the cause
- 10:53:05cannot be controlled. Three responses
- 10:53:08for opportunities include exploiting or
- 10:53:11taking advantage of the opportunity,
- 10:53:14sharing the opportunity, and enhancing
- 10:53:17the impact of the opportunity. And two
- 10:53:20response strategies for threats and
- 10:53:22opportunities include acceptance and
- 10:53:25escalation.
- 10:53:27[Applause]
- 10:53:29[Music]
- 10:53:34[Music]
- 10:53:38Welcome to expert viewpoints risk
- 10:53:40responses. In this video we will hear
- 10:53:43from project managers discussing risk
- 10:53:45management.
- 10:53:46>> Well first of all we want to make a
- 10:53:47determination. Is the risk an
- 10:53:49opportunity or is it a threat? Remember
- 10:53:52risks can be both positive and negative.
- 10:53:56Secondly, remember how we write risks,
- 10:53:58cause, event, and impact. We ask
- 10:54:01ourselves, do we have any control over
- 10:54:04the cause? If we do, then we want to
- 10:54:08avoid a negative cause and we want to
- 10:54:10exploit a positive cause. Now if we have
- 10:54:13no control over the cause, our next step
- 10:54:16is to take a look at the probability and
- 10:54:18the impact. For a negative risk, we want
- 10:54:21to mitigate the risk. We want to go
- 10:54:24ahead and either lower the probability
- 10:54:26or impact of the risk occurring. For a
- 10:54:28positive risk, we want to enhance the
- 10:54:31probability impact. We want to improve
- 10:54:34the probability and impact so that we
- 10:54:36can hopefully achieve the opportunity.
- 10:54:40Now, if there are no team members with
- 10:54:44skills or capacity to manage a risk
- 10:54:46internally, one of the things that you
- 10:54:48may want to do is to transfer the
- 10:54:51negative risk, which means assign the
- 10:54:54negative risk to a third party for
- 10:54:56management and control or share. Share
- 10:54:59is when you have an opportunity, but you
- 10:55:02require third-party support to go ahead
- 10:55:04and achieve that particular opportunity.
- 10:55:07Now there may be a risk that has very
- 10:55:09minimal impact. If that's the case in
- 10:55:11most cases we just accept the risk. It's
- 10:55:14if it occurs it occurs. However, if
- 10:55:17there is a risk that has a really huge
- 10:55:20impact on the project potentially and
- 10:55:22you do not have a good response, then
- 10:55:25you really want to get together with
- 10:55:26your subject matter experts and maybe
- 10:55:28even your sponsor and number one try to
- 10:55:31find a response. But if you can't, you
- 10:55:33may want to take a look at this project
- 10:55:35and re-evaluate it because if this risk
- 10:55:37occurs, the project may go into a
- 10:55:40perpetual state of failure.
- 10:55:42>> So of course you have the different
- 10:55:44options where you can avoid, transfer,
- 10:55:46accept or mitigate. It really depends on
- 10:55:49what the issue is. So for example, um
- 10:55:53during COVID, there was a large
- 10:55:55deployment that I had for a customer and
- 10:55:58we had a solid plan. It was great. We're
- 10:56:00good to go. COVID happened and we're
- 10:56:02like okay great now we have to mitigate
- 10:56:05what sites can we do at this time to
- 10:56:08implement cloud security and a lot of
- 10:56:10stuff we had to do onsite. So we're like
- 10:56:13who will allow us to go on site? Where
- 10:56:15is it actually safe? What type of
- 10:56:17precautions do we have to do? With this
- 10:56:20we were actually still able to make
- 10:56:22timeline. We just had to really change
- 10:56:24our plan around.
- 10:56:25>> Well, first of all, let's define what a
- 10:56:26risk trigger is. A risk trigger is an
- 10:56:29early warning system that a risk is
- 10:56:31about to occur. So the first tip that I
- 10:56:33can provide you is to enlist the support
- 10:56:35of risk owners. Remember, the risk owner
- 10:56:37is that individual who is going to
- 10:56:39manage the end-to-end risk for you. Try
- 10:56:42to find people with the subject matter
- 10:56:43expertise who can go ahead and determine
- 10:56:46what are potential early warning signs
- 10:56:48that a risk is about to occur. That risk
- 10:56:50owner should be your primary source to
- 10:56:52determine triggers and provide those
- 10:56:55early warnings. In addition, enlist the
- 10:56:58support of other experts as well. And if
- 10:57:01you're fortunate enough to be working in
- 10:57:03an organization that documents lessons
- 10:57:06learned and archives them for your use
- 10:57:09and your information, look at lessons
- 10:57:11learned for past projects that are like
- 10:57:13your project and see if you can find
- 10:57:16some past incidences of risks and what
- 10:57:19potential warning signs or triggers
- 10:57:21there were that led to that risk being
- 10:57:25occurring. So, one way that I like to
- 10:57:28really try to find risk throughout the
- 10:57:30project, I mean, they're going to pop up
- 10:57:32anyways, right? A lot of times we're
- 10:57:34going to see them, sometimes we won't.
- 10:57:36And a great way to find these is to have
- 10:57:38frequent team syncs with open
- 10:57:41communications that will help identify a
- 10:57:43risk when it's about to happen. And then
- 10:57:46continuing to monitor the risk register
- 10:57:49and dock reviews. Depending on your
- 10:57:51industry, continue to watch the news to
- 10:57:53see if there's anything potential.
- 10:57:55Normally what I try to do is include an
- 10:57:57outline of a risk owner's
- 10:58:00responsibilities in my risk management
- 10:58:02plan. If I'm fortunate enough to have a
- 10:58:04lot of experienced risk owners, this
- 10:58:06step is not really required. They know
- 10:58:08what they need to do. But if I'm
- 10:58:10enlisting the support of some new risk
- 10:58:12owners or individuals who perhaps have
- 10:58:15never performed this particular function
- 10:58:17before, I may actually conduct a
- 10:58:19training session for how to be a good
- 10:58:22risk owner. Or I may enlist the support
- 10:58:24of senior level risk owners who have
- 10:58:27been there and done it to go ahead and
- 10:58:29train the new people on how to be
- 10:58:30effective.
- 10:58:33[Music]
- 10:58:43Hello everyone. I'd like to go ahead and
- 10:58:45take a few moments to walk through
- 10:58:47another key risk management tool called
- 10:58:51the risk report. We're going to go ahead
- 10:58:53and take a look at the template, review
- 10:58:55the instructions to complete the risk
- 10:58:57report, and hopefully enable you to use
- 10:59:01this tool in your everyday risk
- 10:59:03management efforts.
- 10:59:06We always begin by defining the project
- 10:59:08name, the project manager, and the date.
- 10:59:12The reason for this is that the risk
- 10:59:14report is going to be unique to your
- 10:59:16particular project.
- 10:59:18Define the project purpose. A brief
- 10:59:21description of the project and the
- 10:59:23purpose. Why is this project in
- 10:59:25existence? The next category that is
- 10:59:28recommended is to list the urgent risks.
- 10:59:31Now, what do we mean by urgent? On your
- 10:59:34risk register, you're going to have a
- 10:59:36number of risks. Normally, an urgent
- 10:59:39risk is one that scores probability
- 10:59:42times impact greater than 16. Do not
- 10:59:46include every risk. Embed a table as you
- 10:59:51can see in this particular illustration.
- 10:59:53List the risk by cause, event, and
- 10:59:55impact, the response, and the risk
- 10:59:57score. The purpose of a risk report is
- 11:00:00not to provide status of every risk. It
- 11:00:03is to provide status of the key risks or
- 11:00:06the urgent risks.
- 11:00:09Remember that risks come in two
- 11:00:11categories, threats and opportunities.
- 11:00:13Part of your riskmanagement duties is to
- 11:00:16look for opportunities as much as
- 11:00:19identify those threats. The same rule
- 11:00:22applies. List your opportunities by
- 11:00:26cause, event, impact, your proposed
- 11:00:28response, and the risk score.
- 11:00:32Any new risks that were identified since
- 11:00:34the last report. And if there were a lot
- 11:00:37of risks that were identified, remember
- 11:00:39the rule of urgency. If it is
- 11:00:42probability times impact 16 or greater,
- 11:00:45then you may want to list it. You may
- 11:00:48want to list a risk by exception. If you
- 11:00:51feel that this risk is pertinent, even
- 11:00:53if it does not score 16 or higher, the
- 11:00:57next category recommended in a risk
- 11:00:59report is project risk exposure. And we
- 11:01:03will go ahead and cover that a little
- 11:01:05bit later in this demonstration. A key
- 11:01:08aspect of the risk report is help
- 11:01:11needed. This risk report is not for your
- 11:01:14team. It's not for you. This risk report
- 11:01:18is provided to your sponsor and other
- 11:01:20executive stakeholders and it is meant
- 11:01:23to provide a quick overview of how risk
- 11:01:26management is progressing for the
- 11:01:28project. But a key area is help needed.
- 11:01:32Do you need additional contingency
- 11:01:34reserves, dollars in case of risk? Do
- 11:01:36you need response approval for some of
- 11:01:39the responses that you are proposing?
- 11:01:43Coming back to risk exposure, the
- 11:01:45definition of risk exposure, an
- 11:01:47aggregate measure of the potential
- 11:01:49impact of all risks at a given point in
- 11:01:53a project. A key note, a risk score for
- 11:01:57a threat is a positive number. Risk
- 11:02:00scores for opportunities are subtracted.
- 11:02:03So let's say hypothetically we had three
- 11:02:05risks. Two were threats and one was an
- 11:02:08opportunity. The threat would be 4* 4 or
- 11:02:12a risk score of 16. The opportunity
- 11:02:15potentially 3 * 3 equals 9. But we
- 11:02:18subtract this. Why? Because risk
- 11:02:21exposure is how much negative risk you
- 11:02:24are being exposed to. If there is an
- 11:02:28opportunity, an opportunity can mitigate
- 11:02:31the impact of negative risks and reduce
- 11:02:34the overall risk exposure.
- 11:02:38We have another one which is a threat of
- 11:02:4012. So if we add these up, our risk
- 11:02:44exposure is 19. To summarize this demo,
- 11:02:48here is an overview of a project. In
- 11:02:52week one, the risk score was 60 for all
- 11:02:55of the risks. It dropped to 58 on week
- 11:02:58number two, 54 on week number three, but
- 11:03:00then it began climbing again from week
- 11:03:02number four. Risk exposure shows how the
- 11:03:06overall risk score for all risks in the
- 11:03:09project is either increasing,
- 11:03:12decreasing, or staying the same. This is
- 11:03:15a great tool to determine how well your
- 11:03:18risk management program is working. If
- 11:03:21the exposure is going down, then chances
- 11:03:24are quite good that you and your team
- 11:03:26are doing a wonderful job mitigating the
- 11:03:29potential of risks or enhancing the
- 11:03:32opportunities that are out there. If the
- 11:03:34risk score is going up, that is a ris
- 11:03:37red flag that states we may have some
- 11:03:40problems. Maybe we want to go ahead and
- 11:03:42review this project at greater depth.
- 11:03:45Perhaps there are some risks that we may
- 11:03:47have missed or perhaps some responses
- 11:03:49that we need to go ahead and implement.
- 11:03:52This concludes a quick overview of a
- 11:03:54risk reort and in addition a brief
- 11:03:57explanation of the risk exposure portion
- 11:04:00of this report. We hope that you have a
- 11:04:03better understanding of the risk report
- 11:04:05and we do hope that this is something a
- 11:04:07tool that you can use as you move
- 11:04:09forward. Thank you very much for your
- 11:04:11attention. Have a great day and we look
- 11:04:13forward to seeing you again in future
- 11:04:15demos.
- 11:04:18[Music]
- 11:04:25Welcome to risk reassessment review.
- 11:04:28After watching this video, you will be
- 11:04:30able to recognize the importance of
- 11:04:33timely risk response implementation.
- 11:04:35Describe characteristics of risk audits,
- 11:04:38including audit objectives, frequency,
- 11:04:40and process. Explain the difference
- 11:04:43between residual and secondary risks.
- 11:04:46And describe the contents of an issue
- 11:04:49log. Any risk has the potential to
- 11:04:52become an issue and impact project
- 11:04:54success. A negative risk may impact
- 11:04:57scope, schedules, and budget, and an
- 11:05:00opportunity may be lost. Remember a
- 11:05:03single risk occurrence may lead to
- 11:05:05project failure. So it is essential the
- 11:05:08project risk management team recognize
- 11:05:10and implement a response in case a risk
- 11:05:13does occur. The risk register needs to
- 11:05:16be regularly updated to include response
- 11:05:19strategies. Risk scores might change and
- 11:05:22some risks may no longer be applicable
- 11:05:25and such risks must be removed from the
- 11:05:28risk register. Risk reassessment
- 11:05:30includes risk register updates, risk
- 11:05:33audits, documenting secondary and
- 11:05:35residual risks, and managing issue logs.
- 11:05:40Next, let's look at risk audits. Risk
- 11:05:42audits are an integral part of overall
- 11:05:45project risk management. And here are
- 11:05:48the objectives of a risk audit. Review
- 11:05:50the overall project risk monitoring
- 11:05:53process and determine the overall
- 11:05:55effectiveness of the risk management
- 11:05:57plan. and review the effectiveness of
- 11:06:00risk response strategies to make
- 11:06:02adjustments as required for the
- 11:06:04remaining project. Also determine if
- 11:06:07risk responses were appropriate or if
- 11:06:09further action is required. Remember,
- 11:06:12always document the audit and relevant
- 11:06:15conclusions.
- 11:06:16Now, risk audits should be scheduled at
- 11:06:19an appropriate frequency based on the
- 11:06:21needs of the project. Project scope is a
- 11:06:24key factor that helps in deciding the
- 11:06:26frequency and quantity of audits. Medium
- 11:06:29and large projects may require more
- 11:06:32frequent risk audits. Smaller projects
- 11:06:34may have a risk audit only at the end of
- 11:06:37all work. Risk audit frequency and
- 11:06:40processes are defined in the risk
- 11:06:42management plan. Let's briefly look at
- 11:06:45the risk audit process. A risk audit is
- 11:06:48triggered by the frequency specified in
- 11:06:50the risk management plan. During the
- 11:06:53audit, the overall effectiveness of
- 11:06:55riskmanagement monitoring is evaluated.
- 11:06:58If any changes are identified, the
- 11:07:00project risk management team will make
- 11:07:03the required changes and the risk audit
- 11:07:06also evaluates risk response
- 11:07:08effectiveness. The risk register is
- 11:07:10updated if the response was adequate and
- 11:07:13results are documented in lessons
- 11:07:15learned. If a risk response was not
- 11:07:18adequate, residual risks are identified
- 11:07:21and documented in the risk register for
- 11:07:23further action. Let's understand
- 11:07:26residual risks in more detail. When a
- 11:07:29risk occurs, a response is initiated. In
- 11:07:32some cases, the response is adequate.
- 11:07:35However, in some cases, the risk may
- 11:07:38still be present in an altered state.
- 11:07:40This is referred to as a residual risk.
- 11:07:44Here is an example. Consider this
- 11:07:46scenario. The primary risk snowfall
- 11:07:50resulted in limited parking occurred.
- 11:07:52The identified response use a commercial
- 11:07:55company to plow the parking lot and
- 11:07:57remove the snow was implemented. Later
- 11:08:00an ice coating was found in the parking
- 11:08:02lot under the snow. This is a residual
- 11:08:06risk. The ice became an issue when the
- 11:08:09snow cover was removed. The risk owner
- 11:08:12needs to identify and document the new
- 11:08:14residual risk and implement the response
- 11:08:17to deise the parking lot. Residual risks
- 11:08:20are added to the risk register when
- 11:08:22discovered.
- 11:08:24The project risk management team may
- 11:08:26also encounter secondary risks. Many
- 11:08:29high probability and impact risks
- 11:08:32require multiple risk response options
- 11:08:35and in some cases a primary and fallback
- 11:08:38response is generated. If the primary
- 11:08:42response does not yield desired results,
- 11:08:44the fallback response is initiated. Then
- 11:08:48there may be times when a primary or
- 11:08:50fallback response generates a new risk.
- 11:08:53This is referred to as a secondary risk.
- 11:08:56Here's an example. The primary risk
- 11:08:59response is to increase safety inventory
- 11:09:02levels to mitigate the risk of material
- 11:09:04shortages. However, there is a secondary
- 11:09:08risk. If the team increases safety stock
- 11:09:11levels, they may not have adequate
- 11:09:13storage space. So, the team's response
- 11:09:16is to lease adequate storage space.
- 11:09:18However, this response has cost impacts.
- 11:09:22In this situation, check if the cost
- 11:09:24outweighs the benefits of increasing
- 11:09:26safety stock. Or another way to look at
- 11:09:29the risk might be to check if the costs
- 11:09:32of leasing more storage space outweigh
- 11:09:34the risks of project delays due to
- 11:09:37material shortages. If a secondary risk
- 11:09:40presents greater challenges than the
- 11:09:42primary risk, then the primary risk
- 11:09:45response should be adjusted. Finally,
- 11:09:48let's look at issues and issue logs. An
- 11:09:52issue is defined as a risk that
- 11:09:54occurred. The project team must identify
- 11:09:57issues as soon as possible and implement
- 11:10:00planned risk responses. Any residual
- 11:10:03risks should also be documented. A best
- 11:10:06practice is to create an issue log with
- 11:10:09all relevant information about the issue
- 11:10:12and resolution. An example of headings
- 11:10:14that might be captured in an issue log
- 11:10:17are displayed. Now the contents of an
- 11:10:19issue log should include accurate and
- 11:10:22actionable description of the issue. The
- 11:10:25issue log should also include issue
- 11:10:27priority such as high, moderate or low.
- 11:10:31Remember all issues are not equal. And
- 11:10:34you can also include the issue category
- 11:10:36such as operations or finance. Ensure
- 11:10:40the issue log captures the details about
- 11:10:42the issue reporter and issue resolver.
- 11:10:45This will help establish the required
- 11:10:47communication to efficiently resolve the
- 11:10:50issue. Issue status is another important
- 11:10:53item you must capture and examples of
- 11:10:56issue status include active, deferred or
- 11:10:59resolved. Finally, the issue log must
- 11:11:02contain the date of the resolution which
- 11:11:05will be documented after the issue is
- 11:11:08successfully resolved. Note, the PMI
- 11:11:11does not provide any recommendations on
- 11:11:13the contents of an issue log.
- 11:11:16In this video, you learned that a timely
- 11:11:19response to a risk is important as a
- 11:11:22single risk occurrence may lead to
- 11:11:24project failure. Risk audits help
- 11:11:27determine the effectiveness of the
- 11:11:29riskmanagement plan and response
- 11:11:31strategy. Frequency of risk audits will
- 11:11:34vary based on project scope. Risk audits
- 11:11:38may result in updating the risk
- 11:11:40management plan and residual risks. A
- 11:11:43residual risk is identified when a
- 11:11:45response uncovers an altered risk state.
- 11:11:48A secondary risk is identified when a
- 11:11:51fallback response is implemented. And an
- 11:11:54issue log should contain all relevant
- 11:11:56information about the issue and
- 11:11:59resolution.
- 11:12:02[Music]
- 11:12:10[Music]
- 11:12:13Welcome to expert viewpoints risk
- 11:12:16monitoring.
- 11:12:17In this video, we will hear from project
- 11:12:19managers discussing risk monitoring.
- 11:12:23>> Well, first of all, let's describe what
- 11:12:24a risk reassessment is. Risk is not a
- 11:12:27oneanddone activity. risks are
- 11:12:30identified early in the project, in the
- 11:12:32middle of the project, and at the end of
- 11:12:33the project. And in addition, something
- 11:12:36that perhaps is a high impact risk early
- 11:12:39may turn out to be a low impact risk a
- 11:12:41little bit later. We need a schedule for
- 11:12:44risk reassessments because risk, as I
- 11:12:46said, is not a oneandone. I'm going to
- 11:12:48revert back to the risk management plan.
- 11:12:51In that risk management plan, define
- 11:12:53when risk reassessments are going to be
- 11:12:57scheduled. It can be on a weekly basis.
- 11:12:59It can be part of your overall status
- 11:13:01report or your status meeting. But
- 11:13:03regardless, make sure that you have a
- 11:13:06defined time where all risks are going
- 11:13:08to be reassessed. And just don't leave
- 11:13:11it documented in the plan and expect
- 11:13:13people to read it. Ensure the team, risk
- 11:13:15owners, and key stakeholders are aware
- 11:13:17of the schedule. Sign off and commit to
- 11:13:20adhering to this schedule. And when they
- 11:13:23do, then you can hold them accountable
- 11:13:25for results. Well, first and foremost is
- 11:13:28the right person performing the
- 11:13:30reassessment. If you have an individual
- 11:13:32who is reassessing or assessing an
- 11:13:35initial risk and they really do not have
- 11:13:36the subject matter expertise to provide
- 11:13:38a good opinion, then probably this is a
- 11:13:41wasted effort. Secondly, when changes
- 11:13:44are proposed, is the individual
- 11:13:47proposing the change using subjective or
- 11:13:50objective criteria? If it's subjective
- 11:13:53criteria, verify it with another source.
- 11:13:56If it's objective criteria, make sure
- 11:13:58that the individual is able to go
- 11:14:00provide the data that led them to want
- 11:14:04to change the risk identification,
- 11:14:06probability, impact or whatever.
- 11:14:10Number three, make sure that we are
- 11:14:13taking action to include all changes in
- 11:14:15the risk register. address updated
- 11:14:18status in your status reporting and
- 11:14:21ensure that you adjust urgency levels as
- 11:14:23well. Within risk management, normally
- 11:14:26based on risk score, we have urgent
- 11:14:28risks and we have what we call risks on
- 11:14:31the watch list. We need to pay attention
- 11:14:34to all risks, don't get me wrong, but we
- 11:14:36want to pay the most attention to those
- 11:14:39urgent risks. So if a risk goes from
- 11:14:41from the watch list to the urgent list
- 11:14:44then we really want to pay attention to
- 11:14:46that. So when a risk occurs and becomes
- 11:14:50an issue, I think the first thing that
- 11:14:53you should really do is
- 11:14:56one look at your risk management plan
- 11:14:58and identify
- 11:15:01whether or not that risk was a risk that
- 11:15:04you had on your risk management plan and
- 11:15:07what mitigation strategies or resolution
- 11:15:10strategies you had outlined in your
- 11:15:14plan. Um, so occasionally you'll have
- 11:15:17risks that come up in a project where
- 11:15:20there's a policy for how those risks
- 11:15:22need to be handled and those things
- 11:15:25should have been in your risk management
- 11:15:27plan. So go back, look at that, make
- 11:15:29sure that there's not a specific
- 11:15:31protocol or procedure or policy that you
- 11:15:33need to handle. The second thing would
- 11:15:37be to communicate. So, um, think through
- 11:15:41who needs to be communicated about the
- 11:15:44issue. Don't try to solve it necessarily
- 11:15:48immediately. Think through who needs to
- 11:15:51be communicated to and start reaching
- 11:15:53out to those people. Maybe you need to
- 11:15:55set up a quick phone call. Maybe you
- 11:15:57need to set up a meeting. Maybe you can
- 11:16:00just send the information and the
- 11:16:02communication as an email. But think
- 11:16:05through who you need to communicate to
- 11:16:07and think through the message. Um,
- 11:16:13when you're crafting a message, this is
- 11:16:15where you might start thinking through
- 11:16:17potential solutions. You don't want to
- 11:16:19just communicate to people, particularly
- 11:16:22higher level stakeholders or your
- 11:16:25manager about an issue without coming
- 11:16:28with some type of solution. Even if you
- 11:16:31don't know what that solution should be,
- 11:16:34um, as part of your communication, you
- 11:16:36should say, you know, here's here are
- 11:16:39the things that I'm doing. I've looked
- 11:16:40and reviewed the risk management plan,
- 11:16:42and here's what I've seen. Here's what I
- 11:16:45believe my next step should be. Is there
- 11:16:47any guidance or feedback that you would
- 11:16:49give me as, you know, a higher level uh
- 11:16:52stakeholder in this situation? Um
- 11:16:55sometimes there's decisions that you
- 11:16:57can't make as a project manager and you
- 11:16:59need to involve those people. So be
- 11:17:01clear in that communication if there's
- 11:17:03any action required of that stakeholder
- 11:17:07um or any decisions that need to be made
- 11:17:09by that stakeholder and what the next
- 11:17:12steps are for them. Um and then finally
- 11:17:15then think through the solution and
- 11:17:17start acting on it. uh the faster that
- 11:17:19you can get issues resolved, the less of
- 11:17:23an impact they will have potentially.
- 11:17:26And um you know, you don't want to put
- 11:17:29an issue off for multiple days, even if
- 11:17:33all you can do is communicate, keep
- 11:17:36lines of communication open between
- 11:17:38different parties, help people set up
- 11:17:40meetings where they can make decisions,
- 11:17:43those sorts of things.
- 11:17:45um continue kind of pushing through and
- 11:17:48keeping the momentum of the project
- 11:17:51going and don't um stop. Just keep
- 11:17:56trying to resolve the issue. Keep the
- 11:17:58project going where you can and keep the
- 11:18:01team motivated. Um
- 11:18:04those are things that I would do when a
- 11:18:06risk occurs and becomes an issue.
- 11:18:11[Music]
- 11:18:19Hello everyone. Today I would like to go
- 11:18:21ahead and do a brief demonstration on a
- 11:18:24tool and technique that is used quite
- 11:18:26often in project risk management. This
- 11:18:28tool is called a risk matrix. The
- 11:18:32primary tool that is used to identify
- 11:18:34and document risks by the project team
- 11:18:37is the risk register. However, a risk
- 11:18:40register often has more information than
- 11:18:43is needed by all of the project
- 11:18:45stakeholders. There may be times when
- 11:18:48you need to provide risk status to
- 11:18:51perhaps the sponsor or other key
- 11:18:53stakeholders. When that is the case, a
- 11:18:55risk matrix is your best choice. A risk
- 11:18:58matrix is meant to be a visual tool. A
- 11:19:02risk matrix also provides very quick
- 11:19:05status. The status is meant to be
- 11:19:08impactful. And in addition, by using
- 11:19:11this risk matrix, you can often times
- 11:19:14share your proposed responses and gain
- 11:19:17input on the validity of those responses
- 11:19:20as well. So, let's go ahead and share
- 11:19:23how a project manager and team would
- 11:19:27fill out or complete a risk matrix. We
- 11:19:30have a project called the company
- 11:19:32picnic, and two risks were previously
- 11:19:35identified. Remember a risk is
- 11:19:38documented using cause, event, and
- 11:19:40impact nomenclature. It's called risk
- 11:19:42metal language. A risk should tell a
- 11:19:45story. So our first risk or story, if
- 11:19:48you will, is there is the potential for
- 11:19:51insects to come and bite our
- 11:19:53participants. And if they bite our
- 11:19:55participants, that could result in
- 11:19:57illness and discomfort. So we develop a
- 11:20:00response. Our response is we're going to
- 11:20:02go ahead and provide repellent to all of
- 11:20:05our participants. The next thing we do
- 11:20:08is we go back to our risk register and
- 11:20:10re re review the probability and impact
- 11:20:14ratings. In this particular case, you'll
- 11:20:17notice on the grid we have probability
- 11:20:19three and impact three. We put down R1,
- 11:20:22which stands for risk one. And now we
- 11:20:25have a compelling visual of where risk
- 11:20:27number one fits on the impact and
- 11:20:31probability scale. Our next risk that we
- 11:20:34identified was there is a potential for
- 11:20:36bad weather. And bad weather could bring
- 11:20:39with it rain. And if we do have rain, we
- 11:20:42may have to reduce our events. So what
- 11:20:44is a applicable response? Let's go ahead
- 11:20:47and create a few tents so that people
- 11:20:50can take cover if it rains and still
- 11:20:52enjoy the picnic. We go back to our risk
- 11:20:55register and we see that bad weather was
- 11:21:00a probability of two and an impact of
- 11:21:03four. So, we go to our risk matrix grid
- 11:21:05and we put down risk number two. Let's
- 11:21:09go ahead and identify a third risk.
- 11:21:11Unfortunately,
- 11:21:13we have a lot of illness that is going
- 11:21:15around our particular community. And if
- 11:21:18the illness occurs, we may end up with
- 11:21:21unfortunately
- 11:21:23reduced participation.
- 11:21:28And what is the impact of reduced
- 11:21:30participation? That would be reduced
- 11:21:34team
- 11:21:38[Music]
- 11:21:40interaction. So what can we do as a
- 11:21:43response to this? What we may want to do
- 11:21:46is we may want to allow virtual
- 11:21:48participation.
- 11:21:50Allow those who may be ill or unable to
- 11:21:53attend the event to at least look in,
- 11:21:56hear the keynote speakers, and see some
- 11:21:58of the fun that the team is having at
- 11:22:00the picnic. Remember
- 11:22:03that risk comes in two categories. Risks
- 11:22:06can be negative or threats or positive
- 11:22:08or opportunities. And part of good
- 11:22:11effective risk management is looking for
- 11:22:14opportunities as well. But before we
- 11:22:17move forward, we still have one task. We
- 11:22:20take a look at this new risk and we
- 11:22:22determine what is the probability and
- 11:22:25what is the impact. So our team gets
- 11:22:27together and they determined that the
- 11:22:30probability is probably three, but the
- 11:22:33impact is going to be five. So in this
- 11:22:36particular case, we put down R3. And now
- 11:22:39we have a risk that's in the red area.
- 11:22:42And normally risks that are coded red on
- 11:22:44the risk matrix get a lot of attention
- 11:22:46from the individuals who are receiving
- 11:22:48the status update. Let's take a look at
- 11:22:52a second type of risk, the opportunity.
- 11:22:55We already have one in place. The cause
- 11:22:58is good weather. And if we have good
- 11:23:00weather, we may have an abundance of
- 11:23:03sunshine. And if we have an abundance of
- 11:23:05sunshine, maybe we can plan some more
- 11:23:07events. So what is the response? Well,
- 11:23:10if we do achieve this good weather and
- 11:23:13sunshine, let's add a 1k trail walk. If
- 11:23:17it rains, we will not have that trail
- 11:23:19walk. But if it does, this is just
- 11:23:21another event that will be fun and help
- 11:23:24the team to come together. We identified
- 11:23:27a second opportunity.
- 11:23:30The CEO is supporting this project and
- 11:23:35as a result of this wonderful level of
- 11:23:38CEO support, we can potentially expect
- 11:23:42some increased funding. And what is the
- 11:23:46impact of increased funding? Well, we
- 11:23:49can increase the benefits to the team.
- 11:23:54So, what would be a response to ensure
- 11:23:56that we increase these team benefits?
- 11:24:01What we can do is say, why don't we
- 11:24:04open this picnic up for family members
- 11:24:10[Music]
- 11:24:11as well?
- 11:24:20Now we go to our probability and impact
- 11:24:24for this particular risk. We determine
- 11:24:26that the probability is four and the
- 11:24:28impact is four and we put down R2 in the
- 11:24:33grid. Notice that this is now in a green
- 11:24:37area. What does this mean? It means that
- 11:24:40this is a high probability, high impact
- 11:24:43risk. And if we are able to achieve this
- 11:24:46response by inviting family members,
- 11:24:49we're going to benefit really greatly if
- 11:24:52we're able to go ahead and achieve this
- 11:24:55particular opportunity.
- 11:24:57This ends my overview of the risk
- 11:25:00matrix. Hopefully, this was helpful to
- 11:25:03you to gain a greater understanding of
- 11:25:05this powerful risk management tool. And
- 11:25:08I look forward to seeing you in future
- 11:25:10demos.
- 11:25:14[Music]
- 11:25:22Welcome to the project management
- 11:25:23stakeholders and leadership course. This
- 11:25:26course is ideal for beginners or
- 11:25:27professionals with business experience
- 11:25:29who want to sharpen their business
- 11:25:31skills or even transition into a project
- 11:25:33management role. This course provides
- 11:25:35information and best practices in the
- 11:25:37key areas of project management
- 11:25:38including creating a healthy project
- 11:25:41foundation, effective communications
- 11:25:43building blocks, effective
- 11:25:45communications planning, leadership
- 11:25:47fundamentals, and effectively manage and
- 11:25:50lead stakeholders. Concepts related to
- 11:25:52these areas are presented in five
- 11:25:54modules. The last module will provide
- 11:25:56you with an opportunity to apply your
- 11:25:57newly acquired skills in a graded
- 11:25:59project. Module one provides guidance on
- 11:26:02how a project manager must put their
- 11:26:04people first, create a healthy project
- 11:26:06environment, and embody the virtues of a
- 11:26:08servant leader. Effective communication
- 11:26:10can make or break a project. Module 2
- 11:26:13provides an inventory of effective
- 11:26:15communication building blocks a project
- 11:26:17manager must assemble to ensure project
- 11:26:19success. Key communication skills
- 11:26:22required include communication mediums,
- 11:26:24when to use them, and proven engagement
- 11:26:26tactics. In addition, the module
- 11:26:28provides some tips on cross-cultural
- 11:26:30communications. You'll also learn how to
- 11:26:32fail fast in a way that benefits the
- 11:26:33project along with using the RACI tool
- 11:26:36to identify key project roles. Ensuring
- 11:26:39communication reaches the right audience
- 11:26:41in a timely manner is critical to
- 11:26:42project success. Module 3 highlights
- 11:26:45communications planning. You'll learn
- 11:26:47how to plan and communicate schedules
- 11:26:48effectively. The module also introduces
- 11:26:51a tool called the communications
- 11:26:52management plan. This plan ensures that
- 11:26:54all project communications are organized
- 11:26:56and the right information is available
- 11:26:58to all stakeholders when needed. You'll
- 11:27:01also learn about work performance
- 11:27:02reports focusing on status reporting.
- 11:27:05The module will help you to determine
- 11:27:06your communication style and those of
- 11:27:08your team are explored. Module 4
- 11:27:10introduces key leadership topics. You'll
- 11:27:13understand why a project manager must be
- 11:27:15a good leader. The module will emphasize
- 11:27:17how a leader must know their strengths
- 11:27:18and weaknesses. You'll also be
- 11:27:20introduced to situational leadership and
- 11:27:22a leader's involvement in team
- 11:27:24formation. The module completes with a
- 11:27:26brief overview of a leader's knowledge,
- 11:27:28management duties, and a summary on how
- 11:27:30making decisions using gut calls plays a
- 11:27:32role in effective leadership. Module 5
- 11:27:35discusses a key leadership
- 11:27:36responsibility, resource management.
- 11:27:38You'll be introduced to a resource
- 11:27:40planning and management tool called
- 11:27:41resource breakdown structure, RBS. The
- 11:27:44module also covers tips to effectively
- 11:27:46acquire resources and build trust with
- 11:27:48the team. The module also provides some
- 11:27:50guidance on how you can improve your
- 11:27:52emotional intelligence. You'll also
- 11:27:53learn about some ways to effectively
- 11:27:55manage up such as your manager and
- 11:27:57client. Finally, the module will
- 11:27:59introduce a critical leadership trait,
- 11:28:01adaptability and resilience. Finally, in
- 11:28:04module six, you'll have the opportunity
- 11:28:05to apply the concept you learned in the
- 11:28:07course into a project. You'll submit
- 11:28:09your work and grade your peers. This is
- 11:28:11followed by a final assessment quiz.
- 11:28:13This course will be an aid if you plan
- 11:28:15to attain any PMI certifications
- 11:28:17including certified associate in project
- 11:28:20management or PMI captain project
- 11:28:22management professional or PMI PMP and
- 11:28:25review the opportunity to qualify and
- 11:28:27attain these certifications at PMI.org.
- 11:28:30Your learning journey includes realorld
- 11:28:32insights from the following seasoned
- 11:28:34experts and leaders.
- 11:28:36>> Hi, my name is Megan Peek and I'm a
- 11:28:38senior project manager at Skilup
- 11:28:40Technologies. Hi, my name is Kristen
- 11:28:43Pollson and I'm the director of customer
- 11:28:45success with Skillup Technologies.
- 11:28:48>> Hello everyone, my name is Daniel Yman's
- 11:28:51and I am a subject matter expert at
- 11:28:53Skillup Technologies.
- 11:28:56>> Hello, my name is Katherine Brooks. I'm
- 11:28:57an engineering project manager at tech
- 11:28:59systems for Apple.
- 11:29:01>> Hi, my name is Casey Kyle and I
- 11:29:03currently work developing courses as a
- 11:29:07content creator and subject matter
- 11:29:09expert. Hi, my name is Paul Partardi.
- 11:29:12Um, I've had uh a few titles in my
- 11:29:14career. I've served as a uh software
- 11:29:17development manager as well as a content
- 11:29:20manager for some fairly large teams.
- 11:29:23There's a lot to cover here. To get the
- 11:29:24most from this course, make sure to view
- 11:29:26every video. Check your learning with
- 11:29:28each quiz and complete all the hands-on
- 11:29:30labs. If you have any trouble with any
- 11:29:32of the course material, please don't
- 11:29:34hesitate to contact us in the discussion
- 11:29:36forum. Thank you for being a part of our
- 11:29:38course and welcome. We look forward to
- 11:29:40sharing this critical project management
- 11:29:42knowledge with you.
- 11:29:45[Music]
- 11:29:53Welcome to Put Your People First. After
- 11:29:56watching this video, you'll be able to
- 11:29:58discuss ways to foster a healthy
- 11:29:59environment for team members, explain
- 11:30:02effects of empowering team members. As
- 11:30:04important as schedules, deliverables,
- 11:30:06and tools to manage the project are to
- 11:30:08success, the people that do the work of
- 11:30:10the project matter most. Ensuring that
- 11:30:12the people involved in the project are
- 11:30:14motivated and clearly understand what
- 11:30:15they're working on sets a project up for
- 11:30:17success. Project managers many times
- 11:30:20don't directly manage the people or even
- 11:30:22the work that's being done, but they can
- 11:30:23greatly impact morale and productivity
- 11:30:25by serving the team with clear
- 11:30:27schedules, goals, and deliverables. One
- 11:30:29way project managers can help a team to
- 11:30:31function well is to ensure people are
- 11:30:33working on tasks that match or slightly
- 11:30:35exceed their skill set and disposition.
- 11:30:38For example, software developers
- 11:30:39shouldn't be expected to write marketing
- 11:30:41copy. Project managers can work with
- 11:30:43people managers to ensure there's a
- 11:30:45proper alignment for workers and tasks
- 11:30:47by clearly defining each team member's
- 11:30:49tasks and responsibilities and ensuring
- 11:30:51they understand their role in the
- 11:30:53project. Assigning tasks to team members
- 11:30:55based on their skills, experience, and
- 11:30:57abilities. This maximizes the use of the
- 11:30:59team strengths. Regularly monitoring the
- 11:31:01progress of each team member and the
- 11:31:03project as a whole. This helps identify
- 11:31:05areas where team members may need
- 11:31:07additional support or where tasks may
- 11:31:09need to be reallocated. Providing team
- 11:31:11members with training and development
- 11:31:13opportunities to enhance their skills
- 11:31:14and abilities. This helps to develop a
- 11:31:16highly skilled and motivated team.
- 11:31:18Another way project managers can focus
- 11:31:20on people is by empowering them to keep
- 11:31:22the project moving forward. Empowerment
- 11:31:25is the process of giving team members
- 11:31:27the authority, resources, and support
- 11:31:29they need to complete their tasks
- 11:31:31effectively and achieve their project
- 11:31:33goals. It involves creating an
- 11:31:35environment where team members feel
- 11:31:36valued and appreciated and are
- 11:31:38encouraged to take ownership of their
- 11:31:40tasks and use their skills, experience,
- 11:31:42and creativity to contribute to the
- 11:31:44project's success. Project managers can
- 11:31:47empower their team by matching tasks to
- 11:31:49team members based on their skills,
- 11:31:50experience, and abilities. Matching
- 11:31:52skill sets with the appropriate team
- 11:31:54members empowers them to complete each
- 11:31:56task to the highest standard and
- 11:31:58maximizes the team strengths. Project
- 11:32:00managers also empower their teams by
- 11:32:02creating a positive and supportive work
- 11:32:04environment where team members feel
- 11:32:06valued and appreciated.
- 11:32:08Encouraging open and regular
- 11:32:10communication also empowers team members
- 11:32:12and stakeholders. Open communication can
- 11:32:15help identify issues or concerns and
- 11:32:17allow for effective collaboration and
- 11:32:18problem solving. When team members feel
- 11:32:21empowered, they're more likely to be
- 11:32:22motivated and committed to the project.
- 11:32:25This can lead to higher levels of
- 11:32:26productivity and a more positive work
- 11:32:28environment. Empowerment can help build
- 11:32:30morale and motivation and improve team
- 11:32:32dynamics. Empowering team members
- 11:32:34invites new ideas and innovative
- 11:32:36solutions to the project and can lead to
- 11:32:38improved ways of working. By empowering
- 11:32:41team members to take ownership of their
- 11:32:42tasks, they're more likely to identify
- 11:32:44and solve problems as they arise, which
- 11:32:46can help to keep the project on track.
- 11:32:49Similarly, an empowered team is one that
- 11:32:51knows they can work on any open task on
- 11:32:53which they're skilled to keep the
- 11:32:54project moving forward. This can reduce
- 11:32:56friction and delays and creates a more
- 11:32:58collaborative environment. Since many
- 11:33:00people spend a good portion of their day
- 11:33:02working on projects, project managers
- 11:33:04should help people enjoy what they're
- 11:33:05doing. Promoting open communication and
- 11:33:08fostering a sense of teamwork creates a
- 11:33:10positive and supportive work
- 11:33:11environment. This can help build morale
- 11:33:13and motivation and improve team
- 11:33:15dynamics. Recognize and reward the
- 11:33:17efforts and successes of team members.
- 11:33:19This can help to build motivation and
- 11:33:21also improve team morale. Know which
- 11:33:23things are important and urgent and
- 11:33:25which aren't. Not everything requires
- 11:33:27urgent language and some things don't
- 11:33:28need to be addressed. Knowing how to
- 11:33:30weigh things will help keep the
- 11:33:32important things important. Build trust
- 11:33:33and reduce stress. Encourage team
- 11:33:35members to maintain a healthy work life
- 11:33:37balance. This can help reduce stress and
- 11:33:39burnout and improve overall job
- 11:33:41satisfaction. As a project manager, your
- 11:33:44primary focus should be on timelines,
- 11:33:45deliverables, and ensuring stakeholders
- 11:33:47are getting what they need. People are
- 11:33:49the key to success, and as a project
- 11:33:51manager, you play a crucial role in that
- 11:33:53success. In this video, you learned that
- 11:33:56ways to foster a healthy environment for
- 11:33:58team members include empowering team
- 11:34:00members, builds morale, improves team
- 11:34:03dynamics, invites innovation, reduces
- 11:34:05friction, prevents delays.
- 11:34:10[Music]
- 11:34:19Welcome to communicating clear project
- 11:34:21objectives. After watching this video,
- 11:34:24you'll be able to explain the importance
- 11:34:26of project objectives. Discuss the
- 11:34:28project manager's responsibilities
- 11:34:30regarding the project objectives.
- 11:34:32Explain how project objectives prevent
- 11:34:34scope creep.
- 11:34:36Project managers are generally
- 11:34:37responsible for clearly communicating
- 11:34:39and often setting project objectives.
- 11:34:42These objectives as a foundational
- 11:34:43element of any project are the north
- 11:34:45star. Project objectives are specific,
- 11:34:48measurable and timebound project
- 11:34:50outcomes that a project team works
- 11:34:52towards achieving. Objectives define
- 11:34:54what the project aims to accomplish and
- 11:34:56provide a clear direction for the
- 11:34:58project team. They're typically set at
- 11:35:00the beginning of the project during the
- 11:35:01planning phase and are critical to guide
- 11:35:03decision-making throughout the project
- 11:35:05life cycle. Part of the project
- 11:35:07manager's responsibility in leading the
- 11:35:09team is communicating clear, actionable
- 11:35:11project objectives early and often. If a
- 11:35:14company's running a marketing campaign
- 11:35:16project for a new product, some of its
- 11:35:18project objectives might include
- 11:35:20increase brand awareness by boosting
- 11:35:22website traffic by 50% month over month
- 11:35:25for 3 months before the project
- 11:35:26launches. Attract new customers by
- 11:35:29establishing partnerships with 10 micro
- 11:35:31influencers and co-develop three
- 11:35:33sharable assets. Reach and maintain a 3%
- 11:35:36conversion rate for three months after
- 11:35:38launch by AB testing the product's
- 11:35:40marketing messaging. A project manager
- 11:35:42can document and communicate project
- 11:35:44objectives in the project charter or the
- 11:35:46project scope statement. These documents
- 11:35:49outline what work will be done for the
- 11:35:51project and act as a tool to help
- 11:35:52project managers, project teams, and
- 11:35:54project stakeholders align on project
- 11:35:57objectives. Also, by formally
- 11:35:59documenting and communicating project
- 11:36:01objectives in a project charter or
- 11:36:03project scope statement. Project
- 11:36:05managers set clear expectations for the
- 11:36:07team and protect against under or overd
- 11:36:09delivering. A project manager should
- 11:36:12also communicate the project objectives
- 11:36:14during the project kickoff meeting.
- 11:36:16During a project kickoff meeting, all
- 11:36:18relevant stakeholders such as the
- 11:36:19project sponsor and project team gather
- 11:36:22to discuss the objectives, deliverables,
- 11:36:24risks, and roles. This meeting is the
- 11:36:26perfect time for a project manager to
- 11:36:28communicate project objectives because
- 11:36:30the meeting sets the tone for the
- 11:36:32project, ensures that all stakeholders
- 11:36:34are aligned and creates an opportunity
- 11:36:36for highle stakeholders to reinforce the
- 11:36:38importance of achieving the project
- 11:36:40objectives. During the life of the
- 11:36:42project, a project manager should
- 11:36:44communicate the project objectives
- 11:36:46regularly to continue to keep all
- 11:36:48stakeholders aligned. Project managers
- 11:36:50can do this during daily stand-ups or
- 11:36:52weekly status meetings by tying the work
- 11:36:54that has been done, is in progress, or
- 11:36:56that is yet to be completed to one or
- 11:36:58more of the project objectives. They can
- 11:37:01also include the project objectives in
- 11:37:03weekly reporting dashboards or
- 11:37:04documents. Communicating project
- 11:37:06objectives clearly is crucial to
- 11:37:08ensuring that everyone involved in the
- 11:37:10project understands what they are
- 11:37:12working towards. Whether using verbal or
- 11:37:14written communication, there are some
- 11:37:16ways to ensure that project objectives
- 11:37:18are communicated clearly. When
- 11:37:20communicating objectives, you should use
- 11:37:23clear and concise language to explain
- 11:37:25the project objectives. Avoid using
- 11:37:27technical jargon or complex language
- 11:37:29that may confuse stakeholders. adjust
- 11:37:31the communication of project objectives
- 11:37:33depending on the audience. Different
- 11:37:35stakeholders may have different levels
- 11:37:37of knowledge and interest in the
- 11:37:39project. So, it's important to tailor
- 11:37:41the message to meet their needs. Use
- 11:37:43visual aids such as graphs, diagrams,
- 11:37:45and charts that can help clarify the
- 11:37:47objectives and make them more memorable.
- 11:37:49Help stakeholders understand how the
- 11:37:51team is going to measure the objectives.
- 11:37:54Finally, encourage the questions and
- 11:37:55feedback from the audience to ensure
- 11:37:57that they understand the project
- 11:37:59objectives. Answering questions and
- 11:38:01addressing concerns can help to clarify
- 11:38:03any confusion or misunderstandings.
- 11:38:05Project managers may have the
- 11:38:07responsibility of writing the project
- 11:38:08objectives. Since project objectives are
- 11:38:11so important to the life cycle of the
- 11:38:13project, there are a few characteristics
- 11:38:15that project managers must keep in mind
- 11:38:17when developing them. Project objectives
- 11:38:19should be clear and unambiguous,
- 11:38:21defining exactly what the project aims
- 11:38:23to achieve. They should be quantifiable
- 11:38:25so that progress towards achieving them
- 11:38:27can be tracked and measured. and they
- 11:38:29should be realistic and attainable given
- 11:38:31the project's constraints and available
- 11:38:33resources. It's also important for
- 11:38:35project managers to remember that what
- 11:38:37is left out of project objectives is as
- 11:38:39important as what is put in. Project
- 11:38:41managers may find it difficult to say
- 11:38:43no, especially to key stakeholders. But
- 11:38:45learning to say no helps prevent scope
- 11:38:47creep and reduces the risk of overwork
- 11:38:49teams. Scope creep is when project
- 11:38:51objectives, requirements, and tasks
- 11:38:53expand throughout the life of the
- 11:38:55project, but budget and resource
- 11:38:57constraints stay the same. A small
- 11:38:59amount of scope creep is generally
- 11:39:00understandable, but eventually scope
- 11:39:02creep can lead to missed deadlines and
- 11:39:04increased expenses. Saying no as a
- 11:39:07project manager can be challenging, but
- 11:39:08it is an important skill to have to
- 11:39:10maintain control over the project scope
- 11:39:13and ensure that the project remains on
- 11:39:15track. Here are some tips on how to say
- 11:39:17no as a project manager. When saying no,
- 11:39:19be clear and firm in your response. Use
- 11:39:21a confident and assertive tone to
- 11:39:23communicate that you are not willing to
- 11:39:25accept a request that is outside of the
- 11:39:27project scope. Provide an explanation
- 11:39:29for why the request cannot be
- 11:39:30accommodated, including risks and
- 11:39:32constraints the team is working within.
- 11:39:34When saying no, it's important to keep
- 11:39:36the big picture in mind. Explain how the
- 11:39:38request may impact the project timeline,
- 11:39:40budget, or overall success. Saying no
- 11:39:43doesn't have to be confrontational. Be
- 11:39:45collaborative in your response and show
- 11:39:46that you are willing to work with
- 11:39:48stakeholders to find a solution that
- 11:39:50meets everyone's needs. Offer
- 11:39:51alternatives that may help to address
- 11:39:53the underlying need or concern. Finally,
- 11:39:56document the decision. It's important to
- 11:39:58document the decision to say no and why
- 11:40:00in case questions or challenges arise in
- 11:40:02the future. In this video, you learned
- 11:40:05that project objectives are the guiding
- 11:40:07light or north star of the project.
- 11:40:09Project managers should communicate
- 11:40:11clear, actionable project objectives
- 11:40:13early and often. Document project
- 11:40:15objectives in the project charter and
- 11:40:16communicate them during the project
- 11:40:18kickoff meeting. Effectively communicate
- 11:40:20project objectives by using clear and
- 11:40:22concise language. tailor their message
- 11:40:24and delivery to their audience and
- 11:40:26encourage questions and feedback. Saying
- 11:40:28no as a project manager can be
- 11:40:30challenging, but it is an important
- 11:40:31skill to have in order to maintain
- 11:40:33control over the project scope and
- 11:40:35ensure that the project remains on
- 11:40:37track.
- 11:40:40[Music]
- 11:40:49Welcome to participating in the work.
- 11:40:51After watching this video, you'll be
- 11:40:53able to define servant leadership,
- 11:40:55discuss the benefits of participating in
- 11:40:57the work as a servant leader, and
- 11:40:59identify best practices that help
- 11:41:00participating in the work as a servant
- 11:41:02leader. Project managers or PMs who
- 11:41:05adopt a servant leader approach can
- 11:41:07create an environment more conducive to
- 11:41:09successful project outcomes. Their teams
- 11:41:11often feel empowered, are more
- 11:41:12collaborative, and have high morale,
- 11:41:14which sets the stage for successful
- 11:41:16projects. Robert K. Greenleaf, credited
- 11:41:19with popularizing the concept of servant
- 11:41:21leadership, says servant leadership is a
- 11:41:23philosophy and set of practices that
- 11:41:26enriches the lives of individuals,
- 11:41:28builds better organizations, and
- 11:41:30ultimately creates a more just and
- 11:41:31caring world. But how do project
- 11:41:33managers put servant leadership into
- 11:41:35practice? The most effective PMs can set
- 11:41:37schedules, learn appropriate project
- 11:41:39vocabulary, and understand nuances of
- 11:41:41project details. Participating in the
- 11:41:44team's work and collaborating with them
- 11:41:46can help you to learn these skills. When
- 11:41:48project managers participate in the work
- 11:41:50that their teams are doing, they better
- 11:41:52understand the tasks involved in the
- 11:41:54project and the challenges that team
- 11:41:55members may face.
- 11:41:58This helps project managers make
- 11:41:59decisions and provide more effective
- 11:42:01guidance and support to team members. By
- 11:42:03participating in their team's work,
- 11:42:05project managers demonstrate their
- 11:42:07willingness to get their hands dirty and
- 11:42:09work alongside their team members. Their
- 11:42:12actions build trust and rapport and
- 11:42:14create a camaraderie that can improve
- 11:42:15team dynamics and morale. While
- 11:42:17participating in the work, project
- 11:42:19managers can also observe the processes
- 11:42:21and procedures in action and identify
- 11:42:23areas for improvement. Then project
- 11:42:26managers can streamline workflows,
- 11:42:28eliminate inefficiencies, and optimize
- 11:42:30project outcomes. Finally, when project
- 11:42:32managers participate in their team's
- 11:42:34work, they lead by example,
- 11:42:36demonstrating the behaviors and
- 11:42:37attitudes they expect from their team
- 11:42:39members.
- 11:42:40This creates a culture of collaboration,
- 11:42:42accountability, and continuous
- 11:42:44improvement.
- 11:42:46As a project manager, you and your team
- 11:42:48may already have full schedules, which
- 11:42:50may make participating in the work seem
- 11:42:51difficult. Some strategies that can help
- 11:42:54make participating in the work easier
- 11:42:56include find 30 minutes to an hour in
- 11:42:59your calendar and schedule time to work
- 11:43:00with the team. You can work on part of
- 11:43:03the project independently or maybe time
- 11:43:05you already have scheduled with a team
- 11:43:07member where you can co-work on the part
- 11:43:08of the project.
- 11:43:10Communicate your intentions and explain
- 11:43:12why you're participating in the work
- 11:43:14before you jump in. This will help team
- 11:43:16members understand your perspective and
- 11:43:18avoid confusion or misunderstandings.
- 11:43:20While it is important to participate in
- 11:43:22the work, it's also important to set
- 11:43:24clear boundaries and avoid
- 11:43:25micromanaging.
- 11:43:27Make it clear that you're there to
- 11:43:28support and assist, but that you trust
- 11:43:30your team members to do their jobs and
- 11:43:32make their own decisions. Be open to
- 11:43:34learning and trying new things when
- 11:43:36participating in the work. Your team
- 11:43:38members may have different perspectives
- 11:43:39or approaches that can help you improve
- 11:43:41your skills and knowledge. By
- 11:43:43participating in the work as a project
- 11:43:45manager, you can build stronger
- 11:43:47relationships with your team members,
- 11:43:48better understand the project, and model
- 11:43:50the behaviors and attitudes you expect
- 11:43:52from your team. In this video, you learn
- 11:43:55that servant leadership emphasizes
- 11:43:56serving the team by focusing on their
- 11:43:58needs while also empowering and
- 11:44:00supporting them to reach their full
- 11:44:02potential. Participating in team members
- 11:44:04work can help stay connected to the
- 11:44:06project, build relationships with team
- 11:44:08members, and identify opportunities for
- 11:44:10improvement that can enhance project
- 11:44:12outcomes. And project managers can
- 11:44:14participate in the work by budgeting
- 11:44:16their time for work, communicating their
- 11:44:18intentions, setting boundaries, and
- 11:44:20being open to learning.
- 11:44:23[Music]
- 11:44:29Welcome to expert viewpoints,
- 11:44:31characteristics of servant leadership.
- 11:44:33In this video, we will hear leaders
- 11:44:35discussing how they balance being a
- 11:44:36leader with being an active participant
- 11:44:38in the day-to-day. You'll also learn
- 11:44:40about the characteristics of the best
- 11:44:42project managers.
- 11:44:44How do you balance being a leader with
- 11:44:46being an active participant in the
- 11:44:47day-to-day?
- 11:44:50I balance being a leader with being a
- 11:44:52active participant day-to-day through a
- 11:44:55couple different methods, my own
- 11:44:57personal methods. One is that I'm highly
- 11:44:59compartmentalized. Um I wear a couple
- 11:45:01different hats in my role at Skillup
- 11:45:04Technologies. One is the director of
- 11:45:06customer success and that um has a lot
- 11:45:09of client-f facing work. one is a
- 11:45:12manager of managers and individual
- 11:45:14contributors and that's a a different
- 11:45:17style of work a different working
- 11:45:18relationship with those folks. I do lead
- 11:45:21some projects um by myself and I'm also
- 11:45:24a consultant for a a big company and so
- 11:45:28what I do is I dedicate time and I
- 11:45:30dedicate days of the week to certain
- 11:45:31activities so that I keep like
- 11:45:33activities together and also client
- 11:45:37specific activities together. So, if I'm
- 11:45:39working um with client A on Mondays, I
- 11:45:42only do client A that day and then
- 11:45:44client B on Tuesdays and so forth. That
- 11:45:47way, I don't get muddled up in what I'm
- 11:45:49doing. Um it's less stress uh on me and
- 11:45:53easier for me to keep track of
- 11:45:54everything. The other thing that I do is
- 11:45:57constantly prioritize and rep prioritize
- 11:46:00and find things in my calendar and in my
- 11:46:03inbox and in my task list, my to-do list
- 11:46:06that I can intentionally neglect either
- 11:46:09altogether it's something that I just
- 11:46:11don't have to do or I can put it off and
- 11:46:14rep prioritize it lower and do it the
- 11:46:17next day, the next week, the next month
- 11:46:19depending on what it is. And then the
- 11:46:21last thing I do is that I do block my
- 11:46:23time so that I do have time without
- 11:46:25meetings, without contact with people
- 11:46:28because I do need some downtime in that
- 11:46:30way. And I allow myself to be vulnerable
- 11:46:33in that way too. I let people know that
- 11:46:35I've had too much too many meetings, too
- 11:46:38many escalations, whatever it is that
- 11:46:40becomes too much. I let people know that
- 11:46:42that I just need to take a little time,
- 11:46:44still be online, still be available to
- 11:46:46chat, but I need to focus on my to-do
- 11:46:49list and work that down.
- 11:46:52I've always taken a very hands-on
- 11:46:54approach to project management and being
- 11:46:56a project management leader. To me, I
- 11:47:00believe that you can't be a successful
- 11:47:02leader without first understanding the
- 11:47:05work that your people are doing and the
- 11:47:08challenges that they face doing them. So
- 11:47:11if anything participating in the work
- 11:47:14really helps you understand what are the
- 11:47:16individual tasks that your team is doing
- 11:47:19on a daily basis, how long do those
- 11:47:22tasks take and what are the dependencies
- 11:47:25that your team has um in accomplishing
- 11:47:28those tasks. So, somebody might be
- 11:47:32working on a part of the project or
- 11:47:34working on a a particular task, but they
- 11:47:36need outside support from another group
- 11:47:40or organization within your company.
- 11:47:42They may need some additional financial
- 11:47:45resources to complete those tasks,
- 11:47:47things like that. And when you
- 11:47:50participate in the work, you can get a
- 11:47:52better understanding of what those
- 11:47:54things are. So then when you're planning
- 11:47:56your project, you can more adequately
- 11:47:59plan for the time and the resources that
- 11:48:01are going to be needed to complete those
- 11:48:04tasks. So some things that I do is at
- 11:48:07the beginning, I actually like to go
- 11:48:08side by side with some of the people
- 11:48:11that I'm working on and find a task that
- 11:48:15is part of their dayto-day and work on
- 11:48:17it alongside of them. So, I try to be,
- 11:48:20you know, really respectful of their
- 11:48:22time, but I do ask that we work on
- 11:48:25something kind of as a pair. And that
- 11:48:28helps me learn all of the steps of that
- 11:48:31task, all of the dependencies, and
- 11:48:34generally how long that task should take
- 11:48:37um for the person that's doing it. And
- 11:48:39then once I kind of get that overview of
- 11:48:42those tasks and how long they take and
- 11:48:44what dependencies there are, then as we
- 11:48:47move forward getting into a project or
- 11:48:49if I understand the components of the
- 11:48:52project, uh there will be times where I
- 11:48:54will step in and take on specific tasks
- 11:48:57that I feel comfortable with my skill
- 11:48:59set and what I know um to reduce the
- 11:49:03burden on the team. So, I'll take on uh
- 11:49:07a task here or there and actually roll
- 11:49:09my sleeves up and get to work.
- 11:49:13>> Well, first and foremost, an experienced
- 11:49:15leader knows their people. There are
- 11:49:17times to be an active participant in the
- 11:49:20work. There are other times, however,
- 11:49:22when a leader needs to empower and take
- 11:49:25a more hands-off approach. If you are an
- 11:49:28expert and working with a team that is
- 11:49:31both inexperienced and have yet to
- 11:49:33mature, you need to become the teacher.
- 11:49:36Show the team what needs to be done. Do
- 11:49:38the work, but teach and set the example
- 11:49:42along the way. In the end, challenge the
- 11:49:45team to duplicate what you shared. At
- 11:49:47that point, stop directing. Participate
- 11:49:50and support.
- 11:49:52Number one, first the best project
- 11:49:55managers know. know what they know and
- 11:49:58know what they don't know. Let's begin
- 11:50:00with what you know. Expert knowledge is
- 11:50:03a huge plus. The best project managers
- 11:50:07share this knowledge. They show the team
- 11:50:09what needs to be done and how to do it
- 11:50:11right. This leads to characteristic
- 11:50:14number two. What don't you know? A
- 11:50:17project leader needs to set the project
- 11:50:19vision and motivate the team to do the
- 11:50:22work. Learn as much about the project
- 11:50:25deliverables as you can and sometimes
- 11:50:28that requires you to roll up your
- 11:50:30sleeves and actually learn yourself.
- 11:50:33Finally, no shortcuts. There are often
- 11:50:36guidelines and boundaries that must be
- 11:50:38adhered to. The best project managers
- 11:50:41show the team the right way to do the
- 11:50:44job while still empowering creativity
- 11:50:47and innovation.
- 11:50:51[Music]
- 11:50:58Welcome to effective conversations.
- 11:51:01After watching this video, you'll be
- 11:51:03able to describe methods for having
- 11:51:05effective conversations, explain key
- 11:51:07communication skills to effectively
- 11:51:09manage a program, and describe
- 11:51:11communication techniques and the
- 11:51:12technologies you can use to implement
- 11:51:14them. When managing a project, you'll
- 11:51:16have ongoing conversations with the team
- 11:51:18and stakeholders. Specifically, there
- 11:51:20are seven conversational areas you'll
- 11:51:22have regularly. Plan the project with
- 11:51:24the team, stakeholders, and sponsors to
- 11:51:26define the scope, goals, and timeline of
- 11:51:28the project. Discuss resource allocation
- 11:51:31with the team to identify required
- 11:51:33resources, human, financial, and
- 11:51:35material, and ensure their availability.
- 11:51:37Talk about project risks with the team
- 11:51:39and stakeholders to identify potential
- 11:51:41risks, assess their impact, and develop
- 11:51:43contingency plans. Work with the team to
- 11:51:46track the project's progress, identify
- 11:51:48any deviations from the plan, and adjust
- 11:51:50the plan as necessary. Talk regularly
- 11:51:53with stakeholders to manage
- 11:51:54expectations, address concerns, and
- 11:51:56ensure their engagement and support
- 11:51:58throughout the project. Have planned and
- 11:52:00ongoing conversations with the team,
- 11:52:02stakeholders, and sponsors to ensure
- 11:52:04regular, transparent, and effective
- 11:52:06communication about the project.
- 11:52:08Throughout the project, talk with the
- 11:52:10team to assess their performance,
- 11:52:11identify areas for improvement, and
- 11:52:13provide feedback. By having effective
- 11:52:15conversations, you can discover
- 11:52:17potential risks before they become
- 11:52:18issues. Managing resources can be
- 11:52:21challenging on any project. Talking with
- 11:52:23your key stakeholders can help you
- 11:52:25determine the resources they have
- 11:52:26available and the capacity they will
- 11:52:28have for the project. Many times,
- 11:52:30projects overlap. When teams use the
- 11:52:32same people to work on multiple
- 11:52:34projects, workloads can become
- 11:52:35overbearing. Discussing this with other
- 11:52:38PMs can help prevent burnout. Project
- 11:52:40managers can help prevent issues that
- 11:52:42may block progress on the project both
- 11:52:44before the project starts and during
- 11:52:46production. By clarifying expectations
- 11:52:48and identifying risks early,
- 11:52:50stakeholders will know what the project
- 11:52:52will entail. During the project, the PM
- 11:52:54will help resolve conflicts and maintain
- 11:52:56transparency on all aspects of the
- 11:52:58project. These help keep the project
- 11:53:00running smoothly. These types of
- 11:53:02conversations will help you understand
- 11:53:04what stakeholders may be concerned
- 11:53:05about. Creating an environment of trust
- 11:53:08and transparency will help stakeholders
- 11:53:10voice their concerns before and during
- 11:53:12the project. Project managers also get
- 11:53:15to share in and promote success stories.
- 11:53:17Effective conversations help people find
- 11:53:19the success in a project and project
- 11:53:20managers get to amplify those success
- 11:53:22stories across the team. Amplifying
- 11:53:25success is self-perpetuating and can
- 11:53:27have a positive effect on a project.
- 11:53:30Planning is essential to have effective
- 11:53:31conversations. While it may seem odd to
- 11:53:34plan for an activity we do on a regular
- 11:53:36basis, planning will help you get the
- 11:53:38most out of your conversations.
- 11:53:40Before you start a conversation, think
- 11:53:42about what you want to achieve from it.
- 11:53:44This will help you focus the
- 11:53:45conversation and keep it on track.
- 11:53:47Prepare a clear and concise agenda for
- 11:53:49the conversation. This will ensure that
- 11:53:51all the important topics are covered and
- 11:53:53that everyone has a shared understanding
- 11:53:55of what will be discussed. Include the
- 11:53:57topics you want to discuss and what data
- 11:53:59or information you need from the
- 11:54:00conversation. and be sure to address any
- 11:54:03assumptions you have about the topics.
- 11:54:05Consider the type of conversation you're
- 11:54:07having and choose an appropriate mode
- 11:54:08for the type of conversation you are
- 11:54:10having. For example, face-toface
- 11:54:12synchronous conversations may be more
- 11:54:14effective for sensitive or complex
- 11:54:16topics, while email or chat may be more
- 11:54:18appropriate for routine updates.
- 11:54:20Encourage all participants to
- 11:54:22effectively listen to one another and
- 11:54:23engage in a two-way dialogue. This will
- 11:54:25help build trust and foster a positive
- 11:54:27and productive environment. Conflicts
- 11:54:30are inevitable in any project, but as a
- 11:54:32project manager, you should be prepared
- 11:54:34to handle them effectively. Encourage
- 11:54:36open and honest communication. Listen to
- 11:54:38both sides of the argument and work
- 11:54:39towards finding a mutually acceptable
- 11:54:41solution. After the conversation, make
- 11:54:44sure to follow up on any action items or
- 11:54:46decisions that were made. This will help
- 11:54:48keep everyone accountable and ensure
- 11:54:50that the conversation remains
- 11:54:51productive. Project managers should
- 11:54:54continually remind the team of the
- 11:54:55importance of having effective
- 11:54:57conversations early in the project that
- 11:54:59continue through the project's end.
- 11:55:01Effective conversations at the beginning
- 11:55:03of a project help clarify expectations
- 11:55:05and ensure everyone is on the same page.
- 11:55:08This includes defining project goals,
- 11:55:10expectations for team members, and the
- 11:55:11roles and responsibilities of each
- 11:55:13stakeholder. Through effective
- 11:55:15communication, project managers can
- 11:55:17build trust with their team members and
- 11:55:19stakeholders. This helps to foster a
- 11:55:21positive and productive working
- 11:55:22environment which is essential for the
- 11:55:24success of a project. Conversations
- 11:55:26throughout the project allow project
- 11:55:28managers to identify and resolve any
- 11:55:30issues that may arise. This includes
- 11:55:32addressing any roadblocks or challenges
- 11:55:34and finding ways to overcome them.
- 11:55:36Effective communication helps keep
- 11:55:38everyone informed about the progress of
- 11:55:39the project, changes in scope, and any
- 11:55:42other important updates. This helps to
- 11:55:44maintain transparency and keep everyone
- 11:55:46aligned on the project's objectives. By
- 11:55:48engaging in open and honest
- 11:55:50conversations, project managers can
- 11:55:52gather valuable insights and feedback
- 11:55:54from their team members and
- 11:55:55stakeholders. This helps to improve
- 11:55:57decision-making and ultimately leads to
- 11:55:59better project outcomes. In this video,
- 11:56:01you learn that during every project, you
- 11:56:03may have key conversations about project
- 11:56:05planning, resource allocation, risk
- 11:56:07management, progress monitoring,
- 11:56:09stakeholder management, communications,
- 11:56:11and performance evaluation. Planning is
- 11:56:13essential to have effective
- 11:56:14conversations as it'll help you get the
- 11:56:16most out of your conversations.
- 11:56:18Effective conversations are important
- 11:56:20for the entire team and project managers
- 11:56:22should continually remind the team of
- 11:56:24their importance from the beginning of
- 11:56:26the project until the end.
- 11:56:29[Music]
- 11:56:38Welcome to project management
- 11:56:40communication skills. After watching
- 11:56:42this video, you'll be able to describe
- 11:56:44why effective communication is important
- 11:56:46for project managers, identify key
- 11:56:48communication skills essential to the
- 11:56:50success of project managers, and explain
- 11:56:52best practices for different types of
- 11:56:54communication. Communication skills are
- 11:56:57essential for project managers because
- 11:56:58they are responsible for ensuring that
- 11:57:00they inform and engage all stakeholders
- 11:57:02throughout the project. Effective
- 11:57:04communication enables project managers
- 11:57:06to build trust, resolve conflicts,
- 11:57:09provide clear direction and keep
- 11:57:11everyone aligned during the life cycle
- 11:57:12of a project. Poor communication can
- 11:57:15lead to misunderstandings, delays and
- 11:57:18even project failure. Hence, strong
- 11:57:20communication skills are crucial for
- 11:57:22project managers to be successful in
- 11:57:24their role. Communication includes more
- 11:57:26than just the ability to have a
- 11:57:27conversation. Some key communication
- 11:57:29skills that project managers should have
- 11:57:31include active listening, oral
- 11:57:34communication, written communication,
- 11:57:36interpersonal communication, and
- 11:57:38presentations. Active listening is a
- 11:57:40communication technique that involves
- 11:57:42giving your full attention to the
- 11:57:43speaker, avoiding distractions and
- 11:57:45interruptions, and using verbal and
- 11:57:47non-verbal cues to show that you are
- 11:57:49engaged in the conversation. Active
- 11:57:51listening is important because it helps
- 11:57:53project managers understand their
- 11:57:54stakeholders perspectives, needs, and
- 11:57:56concerns, including team members and
- 11:57:58clients. By actively listening, project
- 11:58:01managers can build trust, resolve
- 11:58:03conflicts, identify potential problems
- 11:58:05early on, and make informed decisions in
- 11:58:08the project's best interest. Some ways
- 11:58:10that project managers can practice
- 11:58:12active listening include restating what
- 11:58:14the speaker has said, listening to
- 11:58:16understand and asking open-ended
- 11:58:18questions to show you are interested in
- 11:58:20the conversation. Oral communication is
- 11:58:22the use of spoken language to convey
- 11:58:24information, ideas, and opinions. This
- 11:58:26form of communication is direct,
- 11:58:28immediate, and personal. Project
- 11:58:30managers use oral communication in
- 11:58:32various settings, including one-on-one
- 11:58:35conversations, meetings, and
- 11:58:37presentations. Oral communication is
- 11:58:39crucial for project managers because it
- 11:58:41allows them to quickly and effectively
- 11:58:43convey information and ideas and respond
- 11:58:45to questions and concerns in real time.
- 11:58:48Oral communication is particularly
- 11:58:50important for project managers because
- 11:58:52it allows them to build relationships,
- 11:58:54motivate team members, and negotiate
- 11:58:56with stakeholders. Additionally, oral
- 11:58:58communication can help project managers
- 11:59:00clarify complex concepts and provide
- 11:59:02context for written or visual
- 11:59:04communications. For effective oral
- 11:59:06communication, project managers should
- 11:59:08use clear and concise language. Adapt
- 11:59:11their communication styles based on the
- 11:59:13audience and adjust their tone so that
- 11:59:15it is appropriate for the conversation.
- 11:59:17Written communication is the use of
- 11:59:19written language to document
- 11:59:20information, provide instructions, and
- 11:59:22to communicate with people who are not
- 11:59:24in the same physical location. Examples
- 11:59:26of written communication in a project
- 11:59:28management context include emails,
- 11:59:30direct messaging, reports, and
- 11:59:33presentations.
- 11:59:34Written communication is important for
- 11:59:36project managers because it provides a
- 11:59:38record of information and decisions and
- 11:59:40allows for clear and consistent
- 11:59:42communication with stakeholders who may
- 11:59:44not be available for oral communication.
- 11:59:46Written communication can also help
- 11:59:48project managers clarify complex
- 11:59:50concepts, present data and information,
- 11:59:53and document project processes and
- 11:59:55decisions.
- 11:59:57Effective written communication skills
- 11:59:58are essential for project managers to
- 12:00:00ensure they are efficiently sharing
- 12:00:02accurate information and to promote
- 12:00:04transparency and accountability in
- 12:00:06project management. To communicate
- 12:00:08effectively through written
- 12:00:09communication, project managers should
- 12:00:11write for clarity, be consistent in
- 12:00:13formatting and terminology, tailor their
- 12:00:16writing style for the audience, and
- 12:00:17include graphics and visuals to
- 12:00:19communicate data. Interpersonal
- 12:00:22communication is the process of
- 12:00:23exchanging information, ideas, and
- 12:00:25emotions between two or more people.
- 12:00:27Interpersonal communication can be oral
- 12:00:29or written, but is used to motivate,
- 12:00:32negotiate, and facilitate collaboration.
- 12:00:35Strong interpersonal communication
- 12:00:37skills allow project managers to
- 12:00:38understand the perspectives and needs of
- 12:00:40their stakeholders and to communicate
- 12:00:42effectively to ensure that everyone is
- 12:00:44aligned with the project goals.
- 12:00:46Interpersonal communication also helps
- 12:00:48project managers to gain the trust and
- 12:00:50cooperation of their stakeholders,
- 12:00:52manage and resolve conflicts, as well as
- 12:00:54negotiate and make decisions, which is
- 12:00:56essential for successful project
- 12:00:58outcomes. Effective interpersonal
- 12:01:00communication involves practicing active
- 12:01:02listening skills, employing empathy, use
- 12:01:04appropriate body language, and
- 12:01:06reinforcing messages with non-verbal
- 12:01:08cues. Presentation skills are the
- 12:01:11ability to effectively communicate
- 12:01:13information, ideas, and opinions through
- 12:01:15presentations such as speeches, slide
- 12:01:17presentations, and workshops. This form
- 12:01:20of communication requires the use of
- 12:01:22active listening, oral, written, and
- 12:01:24interpersonal communication to engage an
- 12:01:26audience and convey complex information
- 12:01:28clearly and concisely. Project managers
- 12:01:31with strong presentation skills can
- 12:01:33effectively communicate important
- 12:01:34project information such as goals,
- 12:01:36progress, and outcomes to stakeholders.
- 12:01:39They can also engage and motivate their
- 12:01:41audience and clarify complex concepts.
- 12:01:43This allows them to secure buyin and
- 12:01:46support from stakeholders and to build
- 12:01:48trust and credibility. Effective
- 12:01:50presentations include employing best
- 12:01:52practices from other types of
- 12:01:53communication for presentations. It is
- 12:01:55also highly important to use visuals to
- 12:01:57effectively communicate key points to
- 12:01:59your audience. Jorge is a program
- 12:02:02manager at a large tech company and his
- 12:02:04team just completed part of their
- 12:02:05program and launched a brand new
- 12:02:07product. Jorge's manager asked him to
- 12:02:09give a presentation to the entire group
- 12:02:11of stakeholders. Jorge wants to
- 12:02:13effectively communicate the successful
- 12:02:15launch of the new product and motivate
- 12:02:17the team to continue the rest of the
- 12:02:18program. He also needs to communicate
- 12:02:20the risks of the next phase of the
- 12:02:22project to the stakeholders. Jorge
- 12:02:24begins by greeting the audience,
- 12:02:26introduces himself, and clearly states
- 12:02:28the purpose of the presentation. He uses
- 12:02:30clear and concise language and maintains
- 12:02:32eye contact to engage the audience. He
- 12:02:35utilizes written communication skills by
- 12:02:37using slides and visual aids to support
- 12:02:39his oral communication. The written
- 12:02:41information is concise, relevant, and is
- 12:02:43relevant to what he is saying. He is
- 12:02:45aware of his audience and adapts his
- 12:02:47communication style to meet the
- 12:02:48audience's needs. He uses personal
- 12:02:51anecdotes to create a connection and
- 12:02:52motivate his team. He also responds to
- 12:02:55questions and feedback from the
- 12:02:56audience, demonstrating an openness to
- 12:02:58dialogue and a willingness to work
- 12:02:59together. Throughout the presentation,
- 12:03:01he actively listens to the audience's
- 12:03:03feedback and concerns, asking questions,
- 12:03:06clarifying misunderstandings, and
- 12:03:08incorporating suggestions into the
- 12:03:10presentation as appropriate. In this
- 12:03:12video, you learned that effective
- 12:03:14communication enables project managers
- 12:03:16to build trust, resolve conflicts,
- 12:03:18provide clear direction, and keep
- 12:03:20everyone aligned during the life cycle
- 12:03:22of a project. Key communication skills
- 12:03:25for project managers include active
- 12:03:26listening, verbal and written
- 12:03:28communication, interpersonal
- 12:03:30communication, and presentations.
- 12:03:32Project managers should always aim to
- 12:03:33use clear and concise language and
- 12:03:35tailor their message and delivery to
- 12:03:37their audience. Effective presentations
- 12:03:39include employing best practices from
- 12:03:41each of the other types of communication
- 12:03:43skills.
- 12:03:46[Music]
- 12:03:55Welcome to project communications
- 12:03:57overview. After watching this video,
- 12:03:59you'll be able to describe the key
- 12:04:01strategies to ensure effective
- 12:04:03communication across different project
- 12:04:04processes and explain the skills a
- 12:04:07project manager must have to design and
- 12:04:09implement effective communication.
- 12:04:11Communication begins when the project
- 12:04:13starts and continues through the project
- 12:04:15end. Ensuring smooth communication
- 12:04:17throughout the project is critical to
- 12:04:18the success of the project. The project
- 12:04:21management institute or PMI recommends
- 12:04:23using three processes to ensure
- 12:04:25effective communication with all project
- 12:04:27stakeholders throughout the project. The
- 12:04:29processes include plan communications
- 12:04:32management, manage communications, and
- 12:04:34monitor communications. Each process
- 12:04:36provides certain key strategies to aid
- 12:04:38in effective communication. Let's take a
- 12:04:40look. Plan communications management is
- 12:04:43about planning the management of
- 12:04:44communication. Key strategies outlined
- 12:04:47in this first step include review the
- 12:04:49project charter, project management
- 12:04:51plan, and all pertinent project
- 12:04:52documentation. Consult with subject
- 12:04:54matter experts,memes, and analyze
- 12:04:57project communications requirements
- 12:04:58essential to success. The consulting
- 12:05:00strategy includes understanding
- 12:05:02communications technology needs and
- 12:05:04challenges and utilizing different
- 12:05:06communication methods to evaluate the
- 12:05:08team's interpersonal skills to
- 12:05:10communicate effectively and
- 12:05:11meaningfully. Step one ends with
- 12:05:13developing and distributing a
- 12:05:14comprehensive communications management
- 12:05:16plan. This plan becomes part of the
- 12:05:18formally approved and accepted project
- 12:05:20management plan and provides a roadmap
- 12:05:22to execute the project's communication
- 12:05:24strategy. Remember the goal is to ensure
- 12:05:26the proper communications get to the
- 12:05:28right stakeholders in the right amounts
- 12:05:30at the right time. After the planning is
- 12:05:32complete, the next step is to manage
- 12:05:34communications. During this process,
- 12:05:36some key strategies that a project
- 12:05:38manager must follow to ensure success
- 12:05:40include implementing the communications
- 12:05:42management plan, documenting issues and
- 12:05:45developing a plan to address them,
- 12:05:46ensuring technology works in their favor
- 12:05:49for all project communication, using the
- 12:05:51potential from work performance reports
- 12:05:53to their advantage. Sharing information
- 12:05:55that is pertinent and valuable, asking
- 12:05:57for help and support when required,
- 12:05:59avoiding doing the same thing repeatedly
- 12:06:01and expecting a different result. and
- 12:06:03proactively identifying what is not
- 12:06:05working in your process and proposing a
- 12:06:07plan to fix it. As you manage
- 12:06:09communications for the project, you
- 12:06:11should also monitor communications.
- 12:06:13Monitor communications is PMI's final
- 12:06:15communications process. Some key
- 12:06:18communication effectiveness strategies
- 12:06:19essential to success include continually
- 12:06:22monitor work performance data or WPD.
- 12:06:26This is defined as raw data by PMI. WPD
- 12:06:29is informal communication from
- 12:06:31conversations, emails, and text
- 12:06:32messages. New stakeholders will be
- 12:06:34needed as the project progresses. Prior
- 12:06:37stakeholders may no longer be required
- 12:06:38on the project. Continually update the
- 12:06:41communications management plan to
- 12:06:42reflect where the project is in the life
- 12:06:44cycle accurately. Ensure the formal
- 12:06:46change control system is working. Make
- 12:06:49sure the project is not overcome with
- 12:06:50scope creep. Continue to communicate
- 12:06:52effectively until the final project
- 12:06:54closure. We discussed the key strategies
- 12:06:56for effective communication that apply
- 12:06:58to the three-step process. Next, let's
- 12:07:00look at some skills that a project
- 12:07:02manager must have to design and
- 12:07:03implement effective communication. The
- 12:07:05project manager must possess a good
- 12:07:07understanding of the different
- 12:07:08mechanisms by which information is
- 12:07:10exchanged. This will help the project
- 12:07:12manager to select the right mechanism to
- 12:07:14meet the stakeholders needs. Common
- 12:07:16mechanisms include written which can be
- 12:07:18through physical or electronic
- 12:07:19communication, spoken via face-to-face
- 12:07:22or remote communication, gestures using
- 12:07:24facial expressions or hand gestures,
- 12:07:26media via pictures, actions, or even the
- 12:07:29choice of words, choice of words to
- 12:07:31relay a message. There are many ways to
- 12:07:33relay a similar message through oral or
- 12:07:35written communication. Another essential
- 12:07:37skill project managers must possess is
- 12:07:39understanding the difference between
- 12:07:41formal and informal communication.
- 12:07:43Formal and informal communication can be
- 12:07:45further divided into verbal and
- 12:07:47non-verbal communication. Formal
- 12:07:49communication follows the rules of an
- 12:07:51organization in a respectful manner. An
- 12:07:53example of formal communication is how
- 12:07:55you would talk to your co-workers or
- 12:07:56manager at work. Informal communication
- 12:07:59happens outside of an organization. An
- 12:08:01example of informal communication is how
- 12:08:03you would talk to your friends or
- 12:08:04family. Project managers must also
- 12:08:07understand the stakeholders position in
- 12:08:08the project team and adjust their
- 12:08:10content accordingly. Key stakeholder
- 12:08:12categories include upward including
- 12:08:14senior management stakeholders,
- 12:08:16downward, which can be through the team
- 12:08:18or other members who contribute to the
- 12:08:19work of the project and horizontal
- 12:08:21through peers of the project manager or
- 12:08:23team. Knowledge of how to apply the five
- 12:08:26C's of communication using the PMI model
- 12:08:28is also a mandatory skill for project
- 12:08:30managers. Let's understand the five C's.
- 12:08:33The first C represents correct. Ensure
- 12:08:35grammar and spelling are accurate and
- 12:08:36the intent of the message is well
- 12:08:38stated. Next comes concise. A
- 12:08:40well-crafted message reduces the chances
- 12:08:42of misunderstanding the intent. The
- 12:08:44third C represents clear. Ensure the
- 12:08:47needs of the stakeholders or audiences
- 12:08:49are factored into the message. The
- 12:08:50fourth C of communication is coherent.
- 12:08:53Ensure the flow of ideas is logical. Use
- 12:08:56introductions and summaries. Finally,
- 12:08:58control. Control the flow of words using
- 12:09:00graphics or summaries. In this video,
- 12:09:02you learn that define and implement
- 12:09:04different strategies for effective
- 12:09:06communication during the plan
- 12:09:07communications management. manage
- 12:09:10communications and monitor
- 12:09:11communications project processes. A
- 12:09:14project manager must possess different
- 12:09:16skills to design and implement effective
- 12:09:17communication, including an
- 12:09:19understanding of when to use which
- 12:09:21communication mechanism, ability to
- 12:09:23distinguish between formal and informal
- 12:09:25communication, and the ability to apply
- 12:09:27the five C's of communication using the
- 12:09:29PMI model.
- 12:09:32[Music]
- 12:09:40Welcome to Expert Viewpoints,
- 12:09:42communicating effectively for positive
- 12:09:44results. In this video, we'll hear
- 12:09:46experts and leaders discuss how
- 12:09:47successful conversations led to positive
- 12:09:49results.
- 12:09:51Provide an example of how successful
- 12:09:53conversations led to positive results.
- 12:09:56Consider
- 12:09:58using the OID methodology when you're
- 12:10:02having a crucial conversation of one
- 12:10:05that you expect may be difficult or one
- 12:10:07that you just really want to have a more
- 12:10:09facilitated experience to the
- 12:10:11conversation.
- 12:10:13The OID method was developed by the
- 12:10:15Canadian Institute of Cultural Affair
- 12:10:18Affairs. O stands for objective,
- 12:10:22R stands for reflective, I stands for
- 12:10:25interpretive, and D stands for
- 12:10:27decisional.
- 12:10:29In your meeting, um you'll have a person
- 12:10:31facilitating it. And you'll start by
- 12:10:33establishing the facts, things that you
- 12:10:36want to talk about that you know or
- 12:10:38likely are true, and also any
- 12:10:41observations that need to be shared as
- 12:10:43well. Then you're going to move into
- 12:10:45feelings. What do we feel? what are our
- 12:10:47perceptions about those facts and talk
- 12:10:50through and document those. Then bring
- 12:10:52the two together, analyze the facts and
- 12:10:54the feelings together and interpret this
- 12:10:57analysis so that it will lead you to a
- 12:10:59really well-informed decision. You can
- 12:11:02look up more online about OID
- 12:11:05and again it was uh created by the
- 12:11:07Canadian Institute of Cultural Affairs
- 12:11:10that will help you in your online
- 12:11:11search.
- 12:11:13Well, first and foremost, the Project
- 12:11:14Management Institute or PMI categorizes
- 12:11:17email as informal written
- 12:11:19communications. Admittedly, some emails
- 12:11:22are formal, but the majority are
- 12:11:25informal. A project manager for a
- 12:11:28critical IT project worked from home.
- 12:11:30This project manager relied heavily upon
- 12:11:33email communications. Some of the
- 12:11:36communications were sufficient. Email
- 12:11:38can be situationally effective. However,
- 12:11:41many of the PM's instructions were
- 12:11:43misinterpreted or missed. The PM
- 12:11:46mandated a weekly sync meeting where
- 12:11:49attendance was mandatory. The PM chose
- 12:11:52Zoom as the media, developed ground
- 12:11:54rules for attendance, camera use, and
- 12:11:57meeting protocol. The project management
- 12:12:00institute states that face-to-face
- 12:12:02communications provides the most
- 12:12:04effective results. In this particular
- 12:12:07case, addressing the team via Zoomed
- 12:12:09reduced disconnects led to improved team
- 12:12:13continuity and improved project
- 12:12:15effectiveness. Thank you for your time.
- 12:12:17I look forward to seeing you for
- 12:12:19futureme interviews.
- 12:12:23Nowadays, you really have to stay
- 12:12:24positive in any type of circumstances.
- 12:12:27I'm going to give an example of
- 12:12:29something that happened more recently
- 12:12:31where I had a team and we were not
- 12:12:34succeeding in the best ways. So, one
- 12:12:37participant, they weren't able to join
- 12:12:39every single meeting and they were
- 12:12:40actually one of our topmemes.
- 12:12:43We really needed them for a lot of
- 12:12:45different areas and they were great at
- 12:12:47it. However, they didn't have the time.
- 12:12:50So after speaking with their management,
- 12:12:53they were actually able to get two
- 12:12:54additional people to join the board with
- 12:12:56them. And then from there, that
- 12:12:59individual was able to be theme for that
- 12:13:02group, which was great because he was
- 12:13:05able to teach others. And then also he
- 12:13:08had a lot less responsibilities. A lot
- 12:13:10of stress came off of him. So you could
- 12:13:12just see the relief from him, but also
- 12:13:15we were able to have more members on the
- 12:13:17team to help out.
- 12:13:21[Music]
- 12:13:29Welcome to synchronous and asynchronous
- 12:13:31communication. After watching this
- 12:13:33video, you'll be able to differentiate
- 12:13:35synchronous from asynchronous
- 12:13:37communication. Compare and contrast
- 12:13:39situations in which synchronous versus
- 12:13:41asynchronous communication would be most
- 12:13:43appropriate. There are a number of
- 12:13:45mediums of communication that you can
- 12:13:47use to communicate with your team such
- 12:13:49as video conferencing, a phone call, or
- 12:13:51email. Mediums of communication fall
- 12:13:54into two categories, synchronous and
- 12:13:56asynchronous. Mediums of communication
- 12:13:58will be discussed in further detail in
- 12:14:00another video. Synchronous communication
- 12:14:03means you're communicating with one or
- 12:14:05more people in real time. Inerson
- 12:14:07communication is the most common type of
- 12:14:08synchronous communication. Other
- 12:14:11synchronous mediums include the
- 12:14:12telephone, voice chat, and video chat.
- 12:14:15With asynchronous communication, the
- 12:14:17communication is not in real time.
- 12:14:19There's a time-lapse between when a
- 12:14:21message is sent, when it's received, and
- 12:14:22when it's responded to. Examples of
- 12:14:25asynchronous communication include
- 12:14:27voice, video, and text messages, as well
- 12:14:29as email. Direct messaging can be
- 12:14:31synchronous or asynchronous, and often
- 12:14:33even toggles quickly between the two.
- 12:14:36Think about how many times you've been
- 12:14:37messaging back and forth with someone in
- 12:14:39real time. Then all of a sudden, you
- 12:14:40don't hear back. Often with no notice
- 12:14:42that the person on the other end of the
- 12:14:44conversation got sidetracked and the
- 12:14:46conversation abruptly stops. The
- 12:14:48conversation started as synchronous but
- 12:14:50then suddenly switched to asynchronous.
- 12:14:53Understanding the differences between
- 12:14:55these two types of communication can
- 12:14:57help you select the right communication
- 12:14:59method for a given situation. For
- 12:15:01instance, synchronous communication
- 12:15:02would be preferable when working on a
- 12:15:04project that requires real-time
- 12:15:06decision-m while asynchronous
- 12:15:08communication might be better for tasks
- 12:15:10that require thought and reflection.
- 12:15:13Knowing the differences can help you
- 12:15:14better manage your stakeholders time and
- 12:15:16avoid miscommunications. In general,
- 12:15:19synchronous communication is a better
- 12:15:20option when dealing with a complex and
- 12:15:22sensitive topic that requires
- 12:15:24interpersonal skills to navigate, such
- 12:15:26as conflict management. Synchronous
- 12:15:29communication enables the receiver to
- 12:15:30ask clarifying questions or restate the
- 12:15:33message in their own words to ensure
- 12:15:34they interpreted the message correctly.
- 12:15:37Synchronous communication is also better
- 12:15:39to build rapport. As a project manager,
- 12:15:41you'll need to gain your team members
- 12:15:42and your stakeholders trust. This can
- 12:15:44best be accomplished with real-time
- 12:15:46conversations,
- 12:15:48both project related and more casual
- 12:15:50informal conversations to get to know
- 12:15:52each other on a little more personal
- 12:15:53level. Asynchronous communication is
- 12:15:56preferred though if you wish to have
- 12:15:57more time to think about, craft, and
- 12:15:59edit your message. It's also preferred
- 12:16:01for the receiver if you wish for them to
- 12:16:02have the time to think about and digest
- 12:16:05your message before responding. For
- 12:16:07instance, a project report that
- 12:16:09addresses several key points containing
- 12:16:11statistics is better delivered
- 12:16:12asynchronously.
- 12:16:14Asynchronous communication is often a
- 12:16:16better choice when you need to deliver
- 12:16:17the same message to a group, especially
- 12:16:19if you're working across time zones.
- 12:16:21Coordinating schedules can be
- 12:16:23challenging and timeconuming. There are
- 12:16:25certainly times when you'll need to meet
- 12:16:26at the same time as a group when you
- 12:16:28wish to have a discussion. But if you're
- 12:16:30trying to get the same message to
- 12:16:31multiple people, asynchronous is often
- 12:16:33prudent. In this video, you learned that
- 12:16:36synchronous communication is
- 12:16:37communication that happens in real time.
- 12:16:40Asynchronous communication is
- 12:16:41communication when there's a time lag in
- 12:16:43sending, receiving, and responding to
- 12:16:45the communication. Synchronous
- 12:16:48communication is better when building
- 12:16:49trust or dealing with sensitive topics
- 12:16:51such as conflict management.
- 12:16:53Asynchronous communication is a good
- 12:16:55choice when the message needs to be
- 12:16:56carefully crafted or when communicating
- 12:16:58with a larger group.
- 12:17:01[Applause]
- 12:17:02[Music]
- 12:17:10Welcome to communication mediums. After
- 12:17:12watching this video, you'll be able to
- 12:17:14identify different communication mediums
- 12:17:16and describe the advantages and
- 12:17:19disadvantages of different communication
- 12:17:21mediums. In this video, we'll discuss
- 12:17:23several communication mediums that
- 12:17:25project managers can use to communicate
- 12:17:27with their teams, including in-person
- 12:17:29meetings that allow for real-time
- 12:17:31interaction and collaboration. Email and
- 12:17:33direct messaging are simple and direct
- 12:17:35ways of sending messages to team
- 12:17:36members. Video and audio conferencing
- 12:17:39tools like Zoom, Skype, and Google Meet
- 12:17:41for face-to-face interactions and mobile
- 12:17:44phones can be handy when you need to
- 12:17:45contact a team member urgently. The
- 12:17:48choice of communication mediums depends
- 12:17:50on the nature of the communication
- 12:17:51required based on the team's location,
- 12:17:53availability, and urgency of the
- 12:17:55message. Project managers should choose
- 12:17:57the most appropriate medium to ensure
- 12:17:59effective and efficient communication
- 12:18:01with their team. Traditionally,
- 12:18:03in-person communication has been a
- 12:18:05preferred mode of communication for
- 12:18:07project managers. Let's discuss some
- 12:18:09advantages of in-person communication.
- 12:18:11Participants can gauge the reactions and
- 12:18:13feedback of other team members, making
- 12:18:15it easier to understand their needs and
- 12:18:17concerns. Real-time interaction, like
- 12:18:20meetings, allows team members to work
- 12:18:21together synchronously and collaborate
- 12:18:23effectively. Project managers receive
- 12:18:26immediate input and feedback from team
- 12:18:28members, making it easy to reach a
- 12:18:29consensus and make informed decisions.
- 12:18:32In-person interactions can help build
- 12:18:33better relationships with team members
- 12:18:35by building rapport and trust, leading
- 12:18:37to a positive and productive work
- 12:18:39environment. There can be challenges
- 12:18:41with in-person meetings as well. These
- 12:18:43meetings can be timeconuming and
- 12:18:45expensive, especially if team members
- 12:18:46are in various parts of the world.
- 12:18:48Coordinating the schedules of multiple
- 12:18:50team members can be challenging leading
- 12:18:52to delays and rescheduling.
- 12:18:54Environmental factors such as noise,
- 12:18:56distractions, and lack of privacy can
- 12:18:58also negatively impact the effectiveness
- 12:19:00of meetings. Let's discuss the benefits
- 12:19:02of using electronic messaging such as
- 12:19:04email and direct messaging. Email
- 12:19:06programs like Outlook and Gmail and
- 12:19:08direct messaging such as Slack,
- 12:19:10Microsoft Teams, and WhatsApp provide a
- 12:19:12record of communication that any
- 12:19:13stakeholder can refer to at a later
- 12:19:15point. Electronic messaging can be sent
- 12:19:18and received from any location on
- 12:19:19multiple devices and are lowcost. Both
- 12:19:22email and direct messaging allow for
- 12:19:24swift and easy communication, making
- 12:19:27them ideal for sending quick updates,
- 12:19:29asking questions, and receiving
- 12:19:30responses in close to real time.
- 12:19:32Electronic messaging can free up time
- 12:19:34for more important tasks rather than
- 12:19:36wasting it while trying to coordinate in
- 12:19:38person or face-to-face synchronous
- 12:19:39meetings.
- 12:19:41On the downside of these applications,
- 12:19:43project managers should be careful not
- 12:19:45to overuse these tools. Direct messages
- 12:19:47can distract team members from deep
- 12:19:48work, leading to reduced focus and
- 12:19:50decreased productivity. Both
- 12:19:52applications can lead to
- 12:19:54miscommunication because it's difficult
- 12:19:55to indicate tone and body language. If
- 12:19:57you start to notice misunderstandings
- 12:19:59during conversations using these
- 12:20:01mediums, find another synchronous medium
- 12:20:03such as a video conference or phone call
- 12:20:05to clarify. The CO 19 pandemic brought
- 12:20:08video and audio conferencing to the
- 12:20:10front and center of communication tools
- 12:20:12for many businesses. This type of
- 12:20:14communication is called face-toface and
- 12:20:16is also utilized for video on remote
- 12:20:18meetings. Face toface is the optimal
- 12:20:20method of communicating. Face toface
- 12:20:22allows project teams to better schedule
- 12:20:24and participate real time in synchronous
- 12:20:26meets from any location. Synchronous
- 12:20:28meets may also be virtual. Video and
- 12:20:30audio conferencing also can reduce
- 12:20:32travel costs. While video and audio
- 12:20:34conferencing are great options, there
- 12:20:36are some downsides. Technical issues
- 12:20:38such as poor internet connectivity,
- 12:20:39equipment problems, and software
- 12:20:41compatibility can impact the quality of
- 12:20:43communication. Virtual conferencing,
- 12:20:45particularly audio only, can lack
- 12:20:47in-person communications, personal
- 12:20:49connection, and cues. External
- 12:20:51environmental distractions can impact
- 12:20:53the effectiveness of communication and
- 12:20:54collaboration. Mobile phones can be
- 12:20:57handy when you need to contact a team
- 12:20:58member urgently. However, phone calls
- 12:21:00and text messaging should be used
- 12:21:02judiciously during off hours and
- 12:21:03reserved only for truly urgent needs.
- 12:21:06Regarding all types of communication,
- 12:21:08it's also important to note that project
- 12:21:10managers must be aware of their team's
- 12:21:12work life balance. They should know team
- 12:21:14member locations, work hours, and paid
- 12:21:16time off. Let's consider the case of
- 12:21:18Jordan and how she chooses to use
- 12:21:19different communication mediums with her
- 12:21:21team. Her team's locations encompass
- 12:21:23several time zones. She uses Outlook
- 12:21:25calendars which show all of her team
- 12:21:27members availabilities. She often uses
- 12:21:29face-to-face meetings with Zoom to share
- 12:21:31her screen and display information for
- 12:21:33the team. She emails the team the
- 12:21:35meeting materials to preview before a
- 12:21:37meeting. She asks her team members to
- 12:21:39collaborate synchronously on needs
- 12:21:41basis. In this video, you learned that
- 12:21:43mediums available to project managers
- 12:21:45include inerson, electronic messaging,
- 12:21:48virtual conferencing, and mobile phones.
- 12:21:50Each medium has advantages and
- 12:21:52disadvantages and PMs should use the
- 12:21:54medium that maximizes its benefit and
- 12:21:56minimizes its challenges. Project
- 12:21:58managers should be aware of their team's
- 12:22:00work life balance.
- 12:22:05[Music]
- 12:22:12Welcome to expert viewpoints. What's the
- 12:22:14most effective communication media? In
- 12:22:16this video, experts and leaders will
- 12:22:18discuss their most effective
- 12:22:19communication media, including their
- 12:22:21choice of when to use synchronous and
- 12:22:23asynchronous communications.
- 12:22:26How do you decide when to use
- 12:22:27synchronous versus asynchronous
- 12:22:28communication mediums?
- 12:22:31So, with asynchronous and synchronous
- 12:22:34different types of communication
- 12:22:35mediums, it really depends if you need
- 12:22:38something to be done quickly and it has
- 12:22:40to be in order. So, during my project
- 12:22:42syncs, I only have 15 minutes with my
- 12:22:44team. So, I want to make sure I'm
- 12:22:46synchronous and I'm just going through
- 12:22:48ABC D. Is this done? Do we have any
- 12:22:51updates? Great. What's our next steps?
- 12:22:54Versus asynchronous. When we have a
- 12:22:56project call and it's a working session,
- 12:22:59then we want to allow for a lot more
- 12:23:01wiggle room and it doesn't have to all
- 12:23:03be in order. Synchronous and
- 12:23:06asynchronous communication. Got a lot to
- 12:23:08say on this one, folks.
- 12:23:12So, I believe that synchronous and
- 12:23:14asynchronous communication both
- 12:23:17definitely have their place, but I do
- 12:23:20have a mug that says this meeting could
- 12:23:22have been an email and I try to take
- 12:23:24that very seriously. So when I'm
- 12:23:27deciding whether or not to set up a
- 12:23:29meeting and as project managers when
- 12:23:32you're deciding to set up a meeting, one
- 12:23:33of the things that you need to think
- 12:23:35about as you know a good steward of the
- 12:23:37organization, a good steward of your
- 12:23:39team's time is that a one-hour meeting
- 12:23:42isn't just one hour. If you have a team
- 12:23:45of six or a team of 10 and you call a
- 12:23:471-hour meeting, that's really kind of
- 12:23:50costing your organization 6 to 10 man
- 12:23:55hours of time that somebody could be
- 12:23:58doing other work. So, it's really
- 12:24:00important again as a steward of the
- 12:24:02organization, as a steward of your
- 12:24:04team's time in protecting your team to
- 12:24:08really analyze and and see, does this
- 12:24:12uh situation require a meeting? Do I
- 12:24:15really need to call a meeting? If I do,
- 12:24:16how long does that meeting need to be?
- 12:24:19Can we get things done in 15 minutes or
- 12:24:21a half an hour instead of calling a full
- 12:24:23hourong meeting?
- 12:24:25And when I'm thinking about whether or
- 12:24:28not that's true, there's a couple
- 12:24:29questions that I ask myself. So, is the
- 12:24:32matter extremely urgent? Um, I have a
- 12:24:34boundary in a practice where uh I will
- 12:24:38only respond to emails I will respond to
- 12:24:41emails within 24 hours. Sometimes I
- 12:24:44respond sooner, but I respond to emails
- 12:24:47within 24 hours. And when I'm working on
- 12:24:49a team, I expect that same boundary from
- 12:24:53my team. Um, I don't expect instant
- 12:24:55replies back and forth, whether that's
- 12:24:58chat, email, text. Um, I have a 24-hour
- 12:25:02rule. So, if matter is extremely
- 12:25:05important and it needs to be addressed
- 12:25:07more quickly than 24 hours, then I think
- 12:25:11having a synchronous
- 12:25:13uh communication method, so having an a
- 12:25:17meeting, having a one-on-one, doing a
- 12:25:20quick phone call is very critical. But
- 12:25:23if it's not that important or it's not
- 12:25:25that urgent and it can be responded to
- 12:25:27within 24 hours, then of course you can
- 12:25:30use asynchronous methods of
- 12:25:32communication. Um the other thing that I
- 12:25:35ask is is the meeting extremely
- 12:25:37sensitive? So um is the matter extremely
- 12:25:41sensitive? So, if you're dealing with a
- 12:25:44conflict, you're dealing with personnel
- 12:25:46issues or performance issues, having an
- 12:25:50in-person conversation or at least a
- 12:25:53video meeting is probably your best
- 12:25:56option.
- 12:25:57I use both synchronous and asynchronous
- 12:26:00communication every day. Um, deciding
- 12:26:03which uh to use has actually become
- 12:26:05easier the further along I've gotten in
- 12:26:08my career. Initially in my career, I
- 12:26:10would did not have a lot of meetings and
- 12:26:12so I was in my inbox or in a chat system
- 12:26:15for most of the day. Now, as I'm further
- 12:26:18in my career, I'm in meetings most of my
- 12:26:20day and I try to balance my early
- 12:26:22morning or late afternoon, early
- 12:26:24evening, um, balance the meetings
- 12:26:26throughout the day with email or chat
- 12:26:28during those times. I am very particular
- 12:26:32about my email inbox and my chats and so
- 12:26:35I will have read every email by the end
- 12:26:37of the day and I'll have responded where
- 12:26:40I need to. I may not know the answer but
- 12:26:42I'll say I've read your email. I should
- 12:26:44be able to get back to you tomorrow or
- 12:26:46when I know more. Same with chats. Chats
- 12:26:48usually are a little bit more important
- 12:26:51and so I do try to reply to every chat
- 12:26:53during the day with some sort of
- 12:26:55response other than I've seen this and
- 12:26:57I'm thinking about it. um my nature is
- 12:27:01to lean more towards asynchronous. And
- 12:27:04so if I do find myself not having a lot
- 12:27:06of meetings, then I know that I may be
- 12:27:08defaulting to uh asynchronous behavior
- 12:27:11when I should be um getting meetings
- 12:27:14scheduled or getting on the phone and
- 12:27:15talking to people. And then another good
- 12:27:17rule of thumb is if you are in chat or
- 12:27:19if you are in email and the threads have
- 12:27:21gone back and forth a number of times.
- 12:27:24Some people say three, some people say
- 12:27:26five, you'll want to pay attention to
- 12:27:28when um but when the the thread has gone
- 12:27:30back and forth without resolution or you
- 12:27:32can tell that there's confusion, great
- 12:27:35time to pick up the phone and get people
- 12:27:36in a quick ad hoc meeting, talk it
- 12:27:39through and get to the decision or the
- 12:27:41answer that you need.
- 12:27:45[Music]
- 12:27:53Welcome to effective engagement. After
- 12:27:55watching this video, you'll be able to
- 12:27:57summarize the best practices for
- 12:27:59effective stakeholder engagement,
- 12:28:01understand the stakeholder mapping
- 12:28:02scenarios with power and interest,
- 12:28:04describe the gulf of execution and
- 12:28:06evaluation, and explain the tailoring
- 12:28:08considerations for stakeholder
- 12:28:10engagement. A critical component for the
- 12:28:12success of a project is stakeholder
- 12:28:14engagement. A project manager can keep
- 12:28:16stakeholders engaged and involved by
- 12:28:18frequently communicating project updates
- 12:28:20and new information to ensure everyone
- 12:28:22is on the same page. A project manager
- 12:28:25must ensure the right stakeholders
- 12:28:26receive the appropriate engagement
- 12:28:28level. Identifying and leveraging
- 12:28:30existing relationships and interests
- 12:28:32between stakeholders can be used to
- 12:28:34establish communication. Let's review
- 12:28:36some stakeholder engagement best
- 12:28:37practices, including selecting the right
- 12:28:40communication medium and categorizing
- 12:28:42stakeholders. A best practice is to
- 12:28:44select the right communication medium.
- 12:28:46For example, if a project manager sends
- 12:28:48emails to a stakeholder who prefers
- 12:28:50face-toface conversations, the
- 12:28:52engagement will not be effective. Ensure
- 12:28:54to evaluate the communication medium
- 12:28:56preferences for all key stakeholders
- 12:28:58early in the project. Another best
- 12:29:00practice is to categorize stakeholders.
- 12:29:02The project management institute or PMI
- 12:29:05provides the power and interest model
- 12:29:07for optimal engagement strategies for
- 12:29:08stakeholders in two categories. PMI
- 12:29:11refers to this method as stakeholder
- 12:29:13mapping. In the stakeholder mapping
- 12:29:15method, the two categories are power is
- 12:29:18defined as the ability to influence the
- 12:29:20project and interest is defined as the
- 12:29:22project's impact on the stakeholder
- 12:29:24engagement. Let's review common
- 12:29:26stakeholder power and interest
- 12:29:27scenarios. High power, high interest is
- 12:29:30a scenario where the project manager
- 12:29:32must manage stakeholders closely and
- 12:29:34clearly define the project's information
- 12:29:36and benefits. Stakeholders in this
- 12:29:38category may be sponsors or senior
- 12:29:40management. In a high power, lowinterest
- 12:29:42scenario, stakeholder satisfaction is
- 12:29:44essential to project success. Ensure to
- 12:29:46provide periodic information and
- 12:29:48updates. Examples of stakeholders in
- 12:29:50this scenario are highlevel executives
- 12:29:52who are not deeply involved in the
- 12:29:54project. Low power high interest is a
- 12:29:56scenario where stakeholders with
- 12:29:58responsibilities must be satisfied and
- 12:30:00informed for the project success. For
- 12:30:03example, customers, operations or end
- 12:30:05users who cannot necessarily influence
- 12:30:07the project but need to be heard are low
- 12:30:09power, highinterest stakeholders. The
- 12:30:11low power lowinterest scenario requires
- 12:30:13a project manager to frequently monitor
- 12:30:16stakeholders. Be aware of stakeholders
- 12:30:18and look for any changes in behavior or
- 12:30:20status. We looked at a few power and
- 12:30:22interest scenarios. Let's now look at a
- 12:30:24concept called gulf of execution and
- 12:30:26evaluation. The gulf of execution and
- 12:30:28evaluation or cognitive gulf was
- 12:30:30described by Donald Norman in his 1988
- 12:30:33book, The Design of Everyday Things.
- 12:30:35Norman referred to it as the difference
- 12:30:37between people's intentions and their
- 12:30:39ability to execute them. Imagine this. A
- 12:30:41project manager may have confidence that
- 12:30:43what they want to accomplish can be
- 12:30:45accomplished via a certain communication
- 12:30:47medium such as email. However, email
- 12:30:49communication is not taken well as the
- 12:30:51stakeholder prefers face-to-face
- 12:30:53meetings. In this situation, a gap is
- 12:30:56created between the project manager's
- 12:30:57expectations and the actual results they
- 12:31:00achieve. This gap is referred to as the
- 12:31:02gulf. The gulf of execution is the gap
- 12:31:04between what the user wanted to
- 12:31:06accomplish and the results they achieve.
- 12:31:08The gulf of evaluation differs between a
- 12:31:11systems response and the user's
- 12:31:12expectation. The gulf of evaluation
- 12:31:15requires the project manager to evaluate
- 12:31:17why email was ineffective and determine
- 12:31:19better execution moving forward. A gap
- 12:31:22in the understanding of stakeholder
- 12:31:24preferences can create challenges for a
- 12:31:26successful engagement. For a successful
- 12:31:28engagement, the project manager should
- 12:31:30understand the preferences. For example,
- 12:31:32different people have different
- 12:31:33preferences. A project manager must keep
- 12:31:35the audience in mind. Another example is
- 12:31:38the right selection of communication
- 12:31:39medium. Choose the communication medium
- 12:31:42based on the audience preference. After
- 12:31:44understanding the audience preferences,
- 12:31:46make sure to tailor the engagement with
- 12:31:47stakeholders. Tailoring stakeholder
- 12:31:50engagement is essential. There are three
- 12:31:52critical tailoring considerations that
- 12:31:54the PMI lists, including make sure to
- 12:31:56evaluate the skills and capabilities of
- 12:31:58the project team. Determine the level of
- 12:32:00empowerment team members will have based
- 12:32:02on the project environment and
- 12:32:04organization. implement external
- 12:32:06stakeholders into the team as projects
- 12:32:08may include external stakeholders such
- 12:32:10as vendors, partners or consultants. In
- 12:32:13this video, you learned that best
- 12:32:15practices and stakeholder engagement are
- 12:32:17selecting the right communications
- 12:32:18medium and categorizing stakeholders.
- 12:32:21Stakeholder mapping scenarios based on
- 12:32:23power and interest include high power,
- 12:32:25high interest, high power, low interest,
- 12:32:27low power, high interest, low power, low
- 12:32:29interest. The gulf of execution is the
- 12:32:32gap between what the user wanted to
- 12:32:34accomplish and the results they
- 12:32:35achieved. The gulf of evaluation differs
- 12:32:38between a systems response and the
- 12:32:39user's expectation. For a successful
- 12:32:42engagement, understand the preferences
- 12:32:44and tailor stakeholder engagement in
- 12:32:46terms of people, empowerment, and
- 12:32:47integration.
- 12:32:50[Music]
- 12:32:59Welcome to cross-cultural communications
- 12:33:01and communications channels. After
- 12:33:03watching this video, you'll be able to
- 12:33:05describe the impact of cultures on
- 12:33:07effective communications. Explain how
- 12:33:09communication channels help in effective
- 12:33:11communication and describe the
- 12:33:13grapevine. Diversity is becoming
- 12:33:15predominant in any workforce. With
- 12:33:17diversity comes cultural differences
- 12:33:19which can amplify communication
- 12:33:20differences. A project manager needs to
- 12:33:23understand the challenges posed by
- 12:33:24culture and reduce the risk of
- 12:33:26ineffective project communications. The
- 12:33:28project management body of knowledge
- 12:33:30acknowledges that culture can impact
- 12:33:32effective communications and references
- 12:33:34the brows and price cross-cultural
- 12:33:36communications model. The brows and
- 12:33:39price cross-cultural communications
- 12:33:40model divides the communication into two
- 12:33:42components. Frames of reference and
- 12:33:45communication blockers. Let's look at
- 12:33:46the components in detail. Different
- 12:33:48individuals have naturally different
- 12:33:50frames of reference. An individual's
- 12:33:52frame of reference is impacted by their
- 12:33:54knowledge, experience, norms, and values
- 12:33:56and assumptions about business, people,
- 12:33:58and life. Cultural differences can
- 12:34:00amplify the differences in the natural
- 12:34:02frame of reference. The second component
- 12:34:04in the brows and price cross-cultural
- 12:34:07communications model is cultural
- 12:34:08blockers which can affect communication.
- 12:34:10There are several cultural blockers.
- 12:34:12Language is a cultural blocker as it
- 12:34:14requires translation. There are times
- 12:34:17when the primary language of the
- 12:34:18individuals communicating is different.
- 12:34:20Another cultural blocker is
- 12:34:22communication styles. Different people
- 12:34:24have different communication styles
- 12:34:25despite their cultures. Stereotypes are
- 12:34:28another cultural blocker. Different
- 12:34:30cultures tend to stereotype others and
- 12:34:32assume everyone fits a single mold.
- 12:34:34Stereotypes can be damaging because they
- 12:34:36can lead to prejudice, ecological
- 12:34:38fallacies, and discrimination. Another
- 12:34:40cultural blocker specified in the brows
- 12:34:43and price cross-cultural communications
- 12:34:45model is relationships. The level of
- 12:34:47your relationship can impact
- 12:34:49communications. In some cultures,
- 12:34:51relationships and trust must be
- 12:34:52established before communications can be
- 12:34:54open. To summarize the brows and price
- 12:34:57cross-cultural communications model,
- 12:34:59different people have a diverse frame of
- 12:35:01reference. Compound this reality with
- 12:35:03the cultural realities of language
- 12:35:05styles, stereotypes, and relationship
- 12:35:07factors, and you have a challenge. The
- 12:35:09intended message sent may very well not
- 12:35:11be the message received. Next, let's
- 12:35:13understand the concept of communication
- 12:35:15channels. PMI defines communications
- 12:35:17channels as the number of potential
- 12:35:19conversations that can occur. There are
- 12:35:21four team members. In all, six potential
- 12:35:24conversations can take place. Here's the
- 12:35:26formula to calculate the six channels
- 12:35:28for a four-person team. Notice that the
- 12:35:30number of channels increases
- 12:35:31dramatically with only six team members.
- 12:35:34Understanding the communication channels
- 12:35:35and how to calculate them will help
- 12:35:37project managers communicate effectively
- 12:35:39in a project. Communication channel
- 12:35:41details are documented in the
- 12:35:43communications management plan which
- 12:35:45defines critical project communications
- 12:35:47items and promptly provides information
- 12:35:49about using suitable mediums. The
- 12:35:51communications management plan helps the
- 12:35:53project manager ensure all stakeholders
- 12:35:55have the correct information about the
- 12:35:56project. The plan also ensures all
- 12:35:59channel members share accurate
- 12:36:00information. A project manager must also
- 12:36:03be aware of the grapevine effect which
- 12:36:04can be a potential risk to the project.
- 12:36:06Grapevine is how rumors spread. For
- 12:36:09example, rumors may spread if
- 12:36:10stakeholders and project team members do
- 12:36:12not have access to accurate and timely
- 12:36:14information. Again, a communications
- 12:36:16management plan mitigates the risk of
- 12:36:18the grapevine effect. In this video, you
- 12:36:21learned that the message intended may
- 12:36:23not be the message received. Cultural
- 12:36:25blockers can affect communication. PMI
- 12:36:28defines communications channels as the
- 12:36:30number of potential conversations that
- 12:36:32can occur. The communications management
- 12:36:34plan must document the number of
- 12:36:36effective communication channels. The
- 12:36:38grapevine is a term that shares how
- 12:36:40rumors spread. A communications
- 12:36:42management plan mitigates the risk of
- 12:36:44misinformation.
- 12:36:47[Music]
- 12:36:55Welcome to when is failing fast good.
- 12:36:58After watching this video, you'll be
- 12:37:00able to identify signs of a failing
- 12:37:02project and describe how failing fast
- 12:37:04can be an opportunity. Over 60% of
- 12:37:06projects fail. The Project Management
- 12:37:08Institute or PMI conducted a study
- 12:37:11concluding the five crucial areas where
- 12:37:13project failures occur, including poor
- 12:37:16project selection and planning when
- 12:37:17deadlines, budgets, and resource limits
- 12:37:19are decided without consideration of
- 12:37:21reality. Inconsistent sponsorship
- 12:37:23results from a lack of engagement from
- 12:37:25the sponsor even after being informed.
- 12:37:27Lack of scope definition awareness
- 12:37:29results in stakeholders adding elements
- 12:37:31to the scope. code green mentality,
- 12:37:34which is the situation when team leaders
- 12:37:36and members only acknowledge or address
- 12:37:38problems and issues only once it's too
- 12:37:40late. Lack of team commitment to support
- 12:37:42the project. But how can a project
- 12:37:44manager identify if a project is moving
- 12:37:46toward failure? Here's some warning
- 12:37:48signs to look out for. One sign is that
- 12:37:50a project has several missed milestones
- 12:37:52and the project schedule is slipping.
- 12:37:54Another sign is when the project is over
- 12:37:56budget. A customer showing
- 12:37:58dissatisfaction or disinterest with the
- 12:38:00quality of deliverables is also a
- 12:38:02warning sign. Another warning sign that
- 12:38:04helps a project manager understand that
- 12:38:06the project is moving towards failure is
- 12:38:08when team members and other stakeholders
- 12:38:10exhibit burnout symptoms or a lack of
- 12:38:12commitment. The project team losing
- 12:38:14confidence in the sponsor or vice versa
- 12:38:16is also a clear warning sign. In
- 12:38:18addition, a warning sign is when there
- 12:38:20is a trend of failed promises and a
- 12:38:22reduction in deliverables. Small
- 12:38:24failures that seem to multiply into more
- 12:38:26significant ones are also something to
- 12:38:28look for. The failing fast concept can
- 12:38:31help change a failing project to a
- 12:38:32successful one before it's too late. The
- 12:38:34failing fast approach can be implemented
- 12:38:36in certain situations such as when
- 12:38:38stakeholder agreements on deliverables
- 12:38:40is low, project technical complexity is
- 12:38:42high or the need for innovation is high.
- 12:38:45Failing fast can be a learning
- 12:38:46opportunity. At the end of a project
- 12:38:48phase, identify what went well, what can
- 12:38:51be improved, and the actions to take for
- 12:38:52improvement. Ensure the team shares
- 12:38:55their experiences and uses the learning
- 12:38:56in the next phase of the project or in
- 12:38:58the next project. Remember, effective
- 12:39:01communication can lead to real-time
- 12:39:03feedback that allows a project manager
- 12:39:05to identify fail fast opportunities
- 12:39:07before they become major losses. In this
- 12:39:10video, you learned that there are five
- 12:39:12crucial areas where project failures
- 12:39:13occur, including poor project selection
- 12:39:16and planning, inconsistent sponsorship,
- 12:39:18lack of scope definition awareness, code
- 12:39:20green mentality, and lack of team
- 12:39:22commitment. There are different warning
- 12:39:24signs of a failing project, including
- 12:39:26missed milestones and a slipping
- 12:39:28schedule, project is over budget,
- 12:39:30customer dissatisfaction and disinterest
- 12:39:32in deliverables, team members and
- 12:39:34stakeholders exhibiting burnout
- 12:39:35symptoms, project team or sponsor losing
- 12:39:38confidence, failed promises, and
- 12:39:40increase in small failures. Failing fast
- 12:39:43is a concept that helps projects go from
- 12:39:45failure to success. Lessons learned
- 12:39:47should be conducted at the end of each
- 12:39:49project phase.
- 12:39:53[Music]
- 12:40:00Welcome to Expert Viewpoints: Failing
- 12:40:02Fast Successfully. In this video, we
- 12:40:04will hear experts and leaders discuss
- 12:40:06how failing fast can benefit a project
- 12:40:08or organization, get tips to determine
- 12:40:10if you are truly failing, and hear
- 12:40:12examples of how failing fast led to
- 12:40:14long-term success.
- 12:40:17discuss how failing fast can benefit a
- 12:40:20project or organization.
- 12:40:23>> So recently we had a project, it was
- 12:40:26going great, at least at first. Then we
- 12:40:29realized, wait, we got a lot of
- 12:40:31roadblocks here. We don't know exactly
- 12:40:33what we need to do. And then of course,
- 12:40:36boom, we ended up failing. We missed our
- 12:40:39deadlines. It didn't work out. However,
- 12:40:42it was a lessons learned. we were able
- 12:40:44to take that into consideration with our
- 12:40:47next rounds and our next sprints. So
- 12:40:50with that, we knew exactly what our game
- 12:40:52plan was, how we were going to
- 12:40:54accomplish each thing, where our
- 12:40:56roadblocks were going to be, and it
- 12:40:58helped us out in the future. So we were
- 12:41:00thankful that we were actually able to
- 12:41:02have that learning experience at the
- 12:41:04beginning and not throughout the
- 12:41:05project.
- 12:41:07Failing fast works great when you're
- 12:41:09trying out new things, when you're
- 12:41:11looking for ways that you can innovate,
- 12:41:13or when you're looking for ways to
- 12:41:15optimize a process or try something new
- 12:41:18that you're not sure how it's going to
- 12:41:20work out. Why not take a chance, dive
- 12:41:23in, try something, and then see where it
- 12:41:25lands you? I am failing fast at the
- 12:41:27moment. Um, I we have a client who we're
- 12:41:31recording videos for and our on-screen
- 12:41:34talent is on vacation and so I
- 12:41:36volunteered to try out as the on-screen
- 12:41:38talent and we'll see what the client
- 12:41:40thinks. They may say, "No, she's not
- 12:41:42right for these videos and and go decide
- 12:41:45to wait for the on-screen talent to come
- 12:41:47back." But they may say, "Yeah, let's go
- 12:41:48for it. It'd be great to have her in in
- 12:41:51fill in while he's out and be in some of
- 12:41:53the videos." the worst that they're
- 12:41:55going to say is no and that's not going
- 12:41:57to hurt my feelings. And that's really
- 12:41:59where you need to take the chance on
- 12:42:00failing fast is that you're not
- 12:42:02investing yourself personally in the
- 12:42:05initiative that is the unknown and fear
- 12:42:07of the unknown can really hold you back.
- 12:42:10And so take the chance, dive in. You've
- 12:42:13got people around you who are going to
- 12:42:14support you. Um if you're trying your
- 12:42:17best and it doesn't work out the way it
- 12:42:18was intended, nobody's going to fault
- 12:42:20you or get after you for trying your
- 12:42:22best. And then we pivot and we change
- 12:42:24and we make it work out in the right
- 12:42:26way, however that needs to be. One
- 12:42:28caution though is if you are a highly
- 12:42:31visible project or there's a lot of
- 12:42:33pressure, you may want to consider
- 12:42:35taking that chance a little bit more
- 12:42:37strategically. Um you don't want
- 12:42:39something that's super important to fail
- 12:42:42on something that it shouldn't. So do be
- 12:42:44strategic about it, but look for areas
- 12:42:46where you can step into the deep end and
- 12:42:49see how it turns out. It's oddly
- 12:42:51addicting once you start doing it.
- 12:42:54>> In the short term, if you take a
- 12:42:56proactive approach to identify problems
- 12:42:58before they become severe, that is a
- 12:43:01very very positive thing. An ultimate
- 12:43:03goal in failing fast is to number one
- 12:43:06identify the problem when it's still
- 12:43:08small and solve the problem while it's
- 12:43:10small before it becomes large. But
- 12:43:13there's also another benefit of failing
- 12:43:15fast and that's the benefit to the long
- 12:43:17term as well. What you want to do when
- 12:43:20you come up with a great idea and you're
- 12:43:22able to go ahead and preclude a failure
- 12:43:24by failing fast, try to document the
- 12:43:27measures that were taken to identify and
- 12:43:30address the problems that had the
- 12:43:32potential for that project to go ahead
- 12:43:34and fail. Most importantly, perform and
- 12:43:37share lessons learned. Lessons learned
- 12:43:39should be accomplished at the end of
- 12:43:41each phase and at the end of each
- 12:43:42project. However, there's an opportunity
- 12:43:45to perform interim lessons learned. If
- 12:43:47there was some kind of an incident and
- 12:43:49you feel it's worthy of a quick overview
- 12:43:52in terms of what went well, what can be
- 12:43:54improved upon, and what can we do
- 12:43:56differently next time, then by all means
- 12:43:58do them. Lessons learned help future
- 12:44:01project managers avoid the problems that
- 12:44:03your project encountered. But
- 12:44:05periodically, you may discover some
- 12:44:07opportunities and lessons learned allow
- 12:44:10other project managers on future
- 12:44:12projects to possibly understand what
- 12:44:14those opportunities were and embrace
- 12:44:16them as well.
- 12:44:20[Music]
- 12:44:26Welcome to expert viewpoints working
- 12:44:28together as a team. In this video, we
- 12:44:31experts and leaders will share their
- 12:44:33insights into how project managers gain
- 12:44:35the cooperation of multiple roles and
- 12:44:37responsibilities and encourage people to
- 12:44:39work together.
- 12:44:41How does a project manager successfully
- 12:44:43gain the cooperation of multiple team
- 12:44:45members and stakeholders?
- 12:44:48In order to have order technically with
- 12:44:52all stakeholders and team members, we
- 12:44:55need to make sure to really grab their
- 12:44:57cooperation at the beginning of a
- 12:44:59project. So, of course, we set the
- 12:45:01expectation. This is what your weeks are
- 12:45:03going to look like. If you pre-schedu,
- 12:45:06it'll actually help them out to
- 12:45:07understand what the expectations are and
- 12:45:10plan around your meetings with that.
- 12:45:13Have successful team meetings. So when
- 12:45:16you go to meet with everyone, whether
- 12:45:17it's an actual sync, a working session,
- 12:45:20make sure they are organized and
- 12:45:22everybody knows what they're going to be
- 12:45:24doing during those. Have successful
- 12:45:26follow-ups along with next steps. When
- 12:45:29you have consistency like that, you have
- 12:45:31a great organized team. So there's three
- 12:45:35things that come to mind right away. One
- 12:45:37is really work on your communication
- 12:45:39skills. clear, concise communication of
- 12:45:43facts, of accurate information, of
- 12:45:46accurate requests. Um, don't ask
- 12:45:49questions that you already know the
- 12:45:50answer to to prove that you know the
- 12:45:52answer. That can be a real turnoff for
- 12:45:54some people in your project team. Also,
- 12:45:57look and pay attention to what you're
- 12:45:59taking on. I think there can be a
- 12:46:01tendency for project managers to take on
- 12:46:03too much and sometimes tasks that
- 12:46:06somebody else in the project should be
- 12:46:07doing. And you don't want to be in a
- 12:46:09situation where you overpromise and then
- 12:46:12underdel. That may happen just through
- 12:46:14the nature of the project. But if you
- 12:46:17start getting a reputation for
- 12:46:19overpromising and underd delivering,
- 12:46:21then people are going to avoid wanting
- 12:46:25people are going to avoid hearing your
- 12:46:26commitments or they're not going to
- 12:46:27trust that you'll actually deliver on
- 12:46:29what it is that you're committing to.
- 12:46:32Another tip for building rapport is ask
- 12:46:34for feedback. Um it doesn't have to be
- 12:46:37on every project. It doesn't have to be
- 12:46:39on every task within a project.
- 12:46:41Somewhere in between. Um, you know, you
- 12:46:44don't want to bug people all the time
- 12:46:45saying, "Tell me how I can do better.
- 12:46:47Tell me how I'm going to do better." But
- 12:46:49when you do ask for feedback, be sincere
- 12:46:51about it. Be willing to improve based on
- 12:46:54the information that you're hearing. It
- 12:46:56should be constructive feedback that
- 12:46:58you're receiving. And you should be
- 12:47:00willing to listen to it, internalize it,
- 12:47:03reflect on it, and then decide if
- 12:47:05there's any changes that you need to
- 12:47:06make. Hearing how you how other people
- 12:47:09perceive you through their feedback
- 12:47:11helps you build the relationship with
- 12:47:13those people because then you can kind
- 12:47:15of tailor your style to better meet
- 12:47:17their needs.
- 12:47:19>> First of all, define the roles and
- 12:47:21responsibilities based on the project's
- 12:47:24needs. As the project manager, as the
- 12:47:26team, who do we need? What do we need?
- 12:47:29What skill sets are required? What
- 12:47:32subject matter expertise is going to be
- 12:47:34required? Come up with a list of
- 12:47:36personal resources or personnel
- 12:47:38resources that you require. Step number
- 12:47:41two, take this list of these are the
- 12:47:44people that I need to the sponsor. Try
- 12:47:46to fill each position with a name. Step
- 12:47:49number three, we have our names now
- 12:47:51assigned to the roles and
- 12:47:52responsibilities.
- 12:47:54Try to meet with each individual. Face
- 12:47:57to face is wonderful. However, it's
- 12:48:002023. a a virtual environment sometimes
- 12:48:04is required. Ensure each individual
- 12:48:07understands their role and
- 12:48:08responsibilities. Make sure that they
- 12:48:10are willing to commit to support the
- 12:48:13project and make sure that they have the
- 12:48:15capacity to do so. So if for whatever
- 12:48:18reason step number four some personnel
- 12:48:20assignments may not work out then
- 12:48:23identify the disconnects from the prior
- 12:48:25step. share with the sponsor, with the
- 12:48:28key stakeholders, with the managers that
- 12:48:30unfortunately your suggestion for this
- 12:48:33individual for this role may not work
- 12:48:35out. Negotiate,
- 12:48:38do whatever you can to perhaps find
- 12:48:40someone new, someone who can support
- 12:48:43this particular role and responsibility,
- 12:48:45and then move forward. Once you have all
- 12:48:48of the faces committed and you have all
- 12:48:50of the positions filled, finalize your
- 12:48:53stakeholder register and your resource
- 12:48:55management plan. Periodically check in
- 12:48:58and address issues. The final question
- 12:49:01in this segment that I want to address
- 12:49:02is how do you encourage people in
- 12:49:04various roles to work together? Well,
- 12:49:07first and foremost, ensure all of the
- 12:49:09stakeholders understand the value of the
- 12:49:12project. No matter how dedicated, no
- 12:49:14matter how motivated a stakeholder may
- 12:49:16be, if they don't see value in a
- 12:49:18project, then chances are pretty good
- 12:49:20that their motivational level is going
- 12:49:22to be very, very low. Secondly, ensure
- 12:49:25everyone has a clear understanding of
- 12:49:27their roles and responsibilities. Avoid
- 12:49:30duplication of effort. One of the worst
- 12:49:32things that you can do is to assign one
- 12:49:34stakeholder one role and then duplicate
- 12:49:37that with another. They're going to be
- 12:49:39bumping into each other. There's going
- 12:49:40to be friction. There's going to be
- 12:49:41problems. There's going to be chaos.
- 12:49:43There's going to be frustration. There's
- 12:49:44going to be unhappiness.
- 12:49:46Thirdly, make sure that you develop a
- 12:49:50vision for your team. And at your first
- 12:49:53meeting, develop a tool called a team
- 12:49:55charter.
- 12:49:57This is a team where the team gets
- 12:49:59together. They brainstorm, document, and
- 12:50:02you gain consensus on ground rules,
- 12:50:04norms, and acceptable behavior that the
- 12:50:07team will commit to, follow, and hold
- 12:50:10others accountable to.
- 12:50:13[Music]
- 12:50:21Hello everyone and welcome to a
- 12:50:23demonstration on the critical path
- 12:50:25method. Let's begin by defining the
- 12:50:27purpose of the critical path method.
- 12:50:30Critical path method is a popular
- 12:50:32project management scheduling technique.
- 12:50:35It determines the theoretical early
- 12:50:37start and early finish days and/or the
- 12:50:40theoretical late start and late finish
- 12:50:42days for a project. Critical path is
- 12:50:45defined as the path of the longest
- 12:50:47duration in a project network diagram.
- 12:50:51Here is a symbol that you want to
- 12:50:54familiarize yourself with if you are
- 12:50:56going to conduct a critical path
- 12:50:58analysis. Let's begin with an overview
- 12:51:02of key acronyms that you want to
- 12:51:05understand. ES stands for early start.
- 12:51:09This is the earliest that the work
- 12:51:11package can begin. EF stands for early
- 12:51:15finish. This is the earliest that the
- 12:51:17work package can finish. A work package
- 12:51:20is similar to an activity. I'll use the
- 12:51:23term work package throughout this
- 12:51:25demonstration. The duration is the time
- 12:51:28that is going to be required between the
- 12:51:31early start and the early finish. The
- 12:51:34late start is the latest that a work
- 12:51:38package can begin and the late finish is
- 12:51:41the latest that it can finish.
- 12:51:43If there is a difference between the
- 12:51:45early finish and the late finish, we
- 12:51:48have something called slack or float. If
- 12:51:50there is no difference between the early
- 12:51:52finish, late finish or the early start
- 12:51:55and late start, then we have no slack or
- 12:51:58float.
- 12:52:00There are two processes that need to be
- 12:52:04completed to complete a critical path
- 12:52:07analysis. The first is called a forward
- 12:52:10pass. For a forward pass, we're going to
- 12:52:13determine the early start and the early
- 12:52:16finish for each work package. We're
- 12:52:19going to move left to right from the
- 12:52:21early start to the early finish for each
- 12:52:24particular work package in sequence.
- 12:52:28We will complete all of the paths. Once
- 12:52:31we do this, we can determine the path of
- 12:52:34the longest duration, which is the
- 12:52:36critical path.
- 12:52:38The second procedure we're going to
- 12:52:40perform is a backwards pass. The
- 12:52:43backwards pass helps us to determine the
- 12:52:46late start and the late finish. In this
- 12:52:49particular case, we're going to move
- 12:52:51from back to front, right to left. We're
- 12:52:54going to begin with each work packages
- 12:52:57late finish and we're going to move to
- 12:53:00the late start. Very important, complete
- 12:53:04the critical path first. If you do not
- 12:53:07create create if you do not
- 12:53:10if you do not complete the critical path
- 12:53:12first then your results may be
- 12:53:16erroneous. Once we complete the critical
- 12:53:19path then we're going to complete the
- 12:53:21non-critical path from the longest path
- 12:53:23to the shortest. So with that let's go
- 12:53:27ahead and take a look at an example and
- 12:53:30we're going to begin with a forward
- 12:53:32pass. Again a forward pass. We're going
- 12:53:34to determine the early start and the
- 12:53:37early finish for each of our work
- 12:53:39packages.
- 12:53:41Let's begin with path A, D, and G. We
- 12:53:45begin with day number one. This is a
- 12:53:483-day duration work package. So, what is
- 12:53:52the early finish? 1 2 3. We go to work
- 12:53:56package D and we add one day. We begin
- 12:53:59work package D the following day. We
- 12:54:02ended A on day three. We begin D on day
- 12:54:05four. This is 3 days in duration four,
- 12:54:09five, and six. So now we have our early
- 12:54:12finish of day number six. We're
- 12:54:15completing path EDG. So we move forward
- 12:54:18to work package G and we go to the next
- 12:54:22day for the early start, day number
- 12:54:24seven. This is 4 days in duration. 7 8 9
- 12:54:2810. And now we have the time frame
- 12:54:31required to complete A, D, and G. 10
- 12:54:34days.
- 12:54:36Now we still have A, D, and E. We've
- 12:54:39already calculated A and D. However, E
- 12:54:42follows D. So therefore, we ended D, the
- 12:54:46early finish on day six. So the early
- 12:54:48start is going to be day 7. This is a
- 12:54:515-day duration at work package. 7, 8, 9,
- 12:54:5510, and 11. So now we have the early
- 12:54:58finish for path A, D, and E. 11 days, a
- 12:55:03little bit longer than A, D, and G,
- 12:55:06which was 10 days.
- 12:55:08We now have one final forward pass to
- 12:55:11complete path B, C, and F. So we're
- 12:55:15going to begin on day number one with
- 12:55:17our early start for the first work
- 12:55:20package B. 3 days in duration, 1, 2, and
- 12:55:23three for our early finish. We begin the
- 12:55:26next day for our early start for work
- 12:55:29package C. Day number four.
- 12:55:32This is a longer duration work package 7
- 12:55:35days. Four, five, 6, 7, 8, 9, and 10. So
- 12:55:40our early finish is day number 10. The
- 12:55:43next in sequence is work package F. We
- 12:55:47add one day for the early start, day
- 12:55:49number 11. 6 day duration, 11, 12, 13,
- 12:55:5314, 15, and 16.
- 12:55:55We now know that path B, C, and F is
- 12:55:58going to require 16 days. And we've
- 12:56:01learned something very important. Which
- 12:56:03is the path of the longest duration?
- 12:56:06Which is the critical path? The critical
- 12:56:08path is BCF 16 days. This project is
- 12:56:13going to require 16 days.
- 12:56:17Now, we need to go ahead and perform a
- 12:56:20backwards pass. So to perform a
- 12:56:22backwards pass, the first thing you need
- 12:56:25to do is to put the critical path
- 12:56:28duration in the late finish for all of
- 12:56:32the final work packages in each
- 12:56:35particular path. For ADG, we're going to
- 12:56:38go ahead and put the late finish at 16.
- 12:56:41For AD, we're going to put the late
- 12:56:44finish at 16. And we're going to do the
- 12:56:47same for BCF. Now remember for a
- 12:56:50backwards pass the rule is we always
- 12:56:53begin with the critical path and we
- 12:56:54determined through our forward pass that
- 12:56:57BCF is the critical path 16 days. So we
- 12:57:01begin with day number 16 and the late
- 12:57:03finish but now we're going to work
- 12:57:05backwards. This is 6 days in duration.
- 12:57:08So we have to subtract 16 15
- 12:57:1212 and 11. We put the number 11 for 11
- 12:57:17days in the late start.
- 12:57:19Now we're going to go backwards one day.
- 12:57:22This is a backwards pass. So for work
- 12:57:25package C in the late finish, we put in
- 12:57:2910. This is 7 days in duration. We count
- 12:57:32back 7 days. 10 9 8 7 6 5 and 4. And we
- 12:57:37place four in the late start minus one
- 12:57:41day. As we move backwards to work
- 12:57:43package B, day number three, 3 days in
- 12:57:46duration, countdown 3, 2, and 1.
- 12:57:50Now, let's take a look at what we have
- 12:57:53completed for BCF.
- 12:57:56Every box is filled. We want to compare
- 12:57:59the early finish and the late finish and
- 12:58:02see if there is a difference. In this
- 12:58:04particular case, there is no difference.
- 12:58:06The early finish is 16 days. The late
- 12:58:09finish is 16 days. When we subtract
- 12:58:12this, we end up with zero. Let's
- 12:58:15validate by doing the same for the early
- 12:58:18start and the late start. Is there any
- 12:58:20difference between 11 and 11? The answer
- 12:58:23is no. We put zero in this box, which is
- 12:58:28the slack or the float. What do we mean
- 12:58:30by that? It means that the early finish
- 12:58:33and late finish are the same as the
- 12:58:35early start and the late start. We have
- 12:58:38no slack. We have no float. This is the
- 12:58:41critical path. We validate work package
- 12:58:45C 10 10 44 no difference. Zero float and
- 12:58:50slack. Work package B 31 1 no float no
- 12:58:55slack zero. Now very important which is
- 12:59:00the path of the next longest duration
- 12:59:03that is a D and E. So now we're going to
- 12:59:07do the same methodology. We put 16 days
- 12:59:10which is our critical path and the late
- 12:59:12finish. And we're going to subtract
- 12:59:14backwards 5 days which is the duration.
- 12:59:1816 15 14 13 and 12. We put the 12 in the
- 12:59:22late start. But now let's notice
- 12:59:25something very important. There is a
- 12:59:28difference between the early finish and
- 12:59:30late finish of 5 days. There is a
- 12:59:34difference between the early start and
- 12:59:35late start of 5 days. We put the five in
- 12:59:40this particular box, the slack and the
- 12:59:42flow. What do we mean by that? It means
- 12:59:45the earliest we can start work package E
- 12:59:48is day number seven. The latest we can
- 12:59:50start it is day number 12. We have a
- 12:59:53little bit of leeway in terms of when we
- 12:59:56need to start this work package for it
- 12:59:59to be completed by day number 16. AD are
- 13:00:04connected on a singular path. We go day
- 13:00:07number 12 and then we go to D which is
- 13:00:10the work package which precedes E and we
- 13:00:13subtract one day number 11 subtract
- 13:00:16three 11 10 and 9 again we have that
- 13:00:20difference 6 compared to 11 4 compared
- 13:00:24to 9 we have float slack of 5 days we
- 13:00:29subtract one day from D to calculate
- 13:00:32work package A that's day number eight
- 13:00:35subtract Act 3876.
- 13:00:38Again, we have that difference of five
- 13:00:40between the late finish and early
- 13:00:43finish. And the late start and the early
- 13:00:45start, we have float and slack of 5
- 13:00:48days.
- 13:00:50This leaves us with one final activity
- 13:00:53for the backwards pass. And why do we
- 13:00:55save it for last? Because 10 is less
- 13:00:58than 11 and far less than 16. So we do
- 13:01:01the same methodology. The late finish
- 13:01:03gets 16 days. This is 4 days in
- 13:01:05duration. Let's count backwards 4 days.
- 13:01:0816 15 14 13. And now we can go ahead and
- 13:01:12take a look at the difference between
- 13:01:14the early finish and the late finish and
- 13:01:17the early start and the late start. And
- 13:01:19this is 6 days. So for work package G,
- 13:01:23we have the most float and the most
- 13:01:25slack. We have a 6-day window in which
- 13:01:28we can go ahead and plan our early start
- 13:01:31or late start to still complete this
- 13:01:34worst case scenario by 16 days, which is
- 13:01:37our critical path. This concludes our
- 13:01:40overview of this demo. Hopefully
- 13:01:43critical path analysis makes a little
- 13:01:46bit more sense to you. We hope that
- 13:01:49you're able to go ahead and apply what
- 13:01:51you learned in a lab that we have
- 13:01:54planned for you where you will take a
- 13:01:56look at a scenario and develop and
- 13:02:00perform a critical path analysis. Thank
- 13:02:02you for your attention. Have a great
- 13:02:04rest of your day and we look forward to
- 13:02:06seeing you again in future presentations
- 13:02:08and demos.
- 13:02:12[Music]
- 13:02:20Welcome to critical chain method. After
- 13:02:23watching this video, you'll be able to
- 13:02:25define critical chain method. Describe
- 13:02:27the steps involved developing a schedule
- 13:02:29using critical chain method. Define
- 13:02:31differences between critical chain and
- 13:02:33critical path methods and identify when
- 13:02:35to use critical chain method. Imagine
- 13:02:38this. You're part of a 4x200 meter relay
- 13:02:40race. The exercise is simple. run the
- 13:02:42200 meters, pass the baton to the next
- 13:02:45person, and follow the process till the
- 13:02:46last person completes their 200 meters.
- 13:02:49During this time, several things might
- 13:02:50happen. For example, a runner may fall,
- 13:02:53slow down, or increase their speed. The
- 13:02:55goal is to continue to hand off the
- 13:02:56baton until every runner has reached the
- 13:02:58end line. At the beginning of the race,
- 13:03:00the team may take the time to select the
- 13:03:02runners and understand their
- 13:03:03dependencies during the race, such as
- 13:03:05the track, weather, shoes, and so on. In
- 13:03:08addition, a runner only runs or passes
- 13:03:10the baton at a given point in time. They
- 13:03:12cannot perform both actions at the same
- 13:03:13time. The team plans for resource
- 13:03:15shortages. They have an extra runner on
- 13:03:17board just in case. The team also plans
- 13:03:19for time delays. They practice the baton
- 13:03:22exchange and allocate extra time for the
- 13:03:24exchanges in case of an exchange issue.
- 13:03:26They never lose sight of their goal.
- 13:03:27They want to finish the race as quickly
- 13:03:29as possible and win. The critical chain
- 13:03:31method is similar to a relay race. The
- 13:03:33critical chain method is a project
- 13:03:35management technique that emphasizes the
- 13:03:37resources such as people, equipment,
- 13:03:39supplies, materials, and physical space
- 13:03:41required to execute project tasks.
- 13:03:44Critical chain was developed as an
- 13:03:45alternative to the critical path method.
- 13:03:48When using the critical chain method,
- 13:03:49project managers plan project schedules
- 13:03:51with a focus on resource and time
- 13:03:53constraints. The project manager
- 13:03:55identifies the longest sequence of
- 13:03:56resource dependent activities. The
- 13:03:58sequence is referred to as the critical
- 13:04:00chain. The project manager includes
- 13:04:02buffers to protect the critical chain
- 13:04:03from resource shortages and delays and
- 13:04:06to ensure that the project is completed
- 13:04:07on time. At a high level, developing a
- 13:04:10critical chain can be divided into four
- 13:04:11steps. The first step is identifying the
- 13:04:14different activities and creating a
- 13:04:15network diagram. Identify the paths
- 13:04:17including the critical path. In the
- 13:04:19network diagram displayed, path EFG is
- 13:04:22the critical path. Paths A, B, and CD
- 13:04:24are required activities to complete the
- 13:04:26project, but they're not on the critical
- 13:04:28path. The second step is determining the
- 13:04:30potential for resource shortages or
- 13:04:32issues on the non-critical paths. Add
- 13:04:34extra resources in anticipation of
- 13:04:36resource risks materializing. Ensure
- 13:04:38resource issues do not delay the
- 13:04:40non-critical paths to the point where
- 13:04:41the critical path is jeopardized. These
- 13:04:43are called resource buffers. The next
- 13:04:45step is to add feeding buffers which add
- 13:04:48extra time to the non-critical paths.
- 13:04:50Feeding buffers assume that extra time
- 13:04:52or float will likely disappear. For
- 13:04:54example, let's say the critical path EFG
- 13:04:56is 14 days. Path AB is scheduled for 10
- 13:04:59days. A feeding buffer is placed on path
- 13:05:01AB to plan for 12 days. If the work is
- 13:05:04completed in 10 days, great. However,
- 13:05:06there's a possibility of risks
- 13:05:07occurring. Therefore, plan for 12 days.
- 13:05:10Remember, resource buffers also help in
- 13:05:12ensuring delays are minimal. This step
- 13:05:14is performed with each path. The last
- 13:05:16step is to plan for the worst case
- 13:05:18scenario. In this example, the critical
- 13:05:20path EFG will take 14 days. Resources
- 13:05:23and time have been added to the
- 13:05:24non-critical paths to ensure they are
- 13:05:26not delayed to the point where the
- 13:05:27critical path is impacted. But what if
- 13:05:30the critical path activities are
- 13:05:31delayed? To address this scenario, add a
- 13:05:33project buffer at the end of the
- 13:05:34project. Let's say this is 2 days. In
- 13:05:37this case, at a worst case scenario, the
- 13:05:39project will complete in 16 days. This
- 13:05:41completes the overview of the steps in
- 13:05:43the critical chain method. Critical
- 13:05:45chain method is similar to critical path
- 13:05:46method. However, there are a few key
- 13:05:48differences between critical path
- 13:05:50methodology and critical chain
- 13:05:52methodology. These include critical path
- 13:05:54methodology assumes that the length of
- 13:05:56tasks and their dependencies are the
- 13:05:58major constraints while critical chain
- 13:06:00methodology assumes that resources are a
- 13:06:02project's major constraint. Critical
- 13:06:04path methodology simply defines the
- 13:06:06amount of slack or float for each
- 13:06:08activity while critical chain
- 13:06:09methodology adds resource buffers
- 13:06:11between tasks and adds additional time
- 13:06:13buffers at the end of a project if
- 13:06:15needed. Because of these differences,
- 13:06:17when using critical path methodology,
- 13:06:19project teams can be working on multiple
- 13:06:21project tasks at a time. Whereas with
- 13:06:24critical chain methodology, project
- 13:06:26teams focus on one critical task at a
- 13:06:28time before they're able to move on to
- 13:06:29another. Critical path methodology and
- 13:06:31critical chain methodology are both
- 13:06:33project management planning techniques,
- 13:06:35but they have different approaches and
- 13:06:36applications. You should use critical
- 13:06:38path methodology when the project is
- 13:06:40well- definfined. There's a high level
- 13:06:42of certainty in the task duration and
- 13:06:44resource availability and the project is
- 13:06:46relatively simple with a straightforward
- 13:06:48sequence of tasks. For example, planning
- 13:06:50an event with a clear sequence of tasks
- 13:06:52and a fixed timeline. You should use
- 13:06:54critical chain methodology when the
- 13:06:56project is complex and uncertain. There
- 13:06:58are significant risks and variability
- 13:07:00and the availability of resources is
- 13:07:02limited or resources are shared across
- 13:07:04multiple projects. For example,
- 13:07:06researching and developing a new
- 13:07:07pharmaceutical drug. In this video, you
- 13:07:10learned that critical chain method adds
- 13:07:12the availability of resources and their
- 13:07:14dependencies while determining the
- 13:07:16minimum time required to complete the
- 13:07:18project. There are four key steps in the
- 13:07:20critical chain method. Critical path
- 13:07:22methodology is best for well- definfined
- 13:07:24projects while critical chain
- 13:07:25methodology is best for uncertain
- 13:07:27projects.
- 13:07:30[Music]
- 13:07:38Welcome to key tool communications
- 13:07:40management plan. After watching this
- 13:07:42video, you'll be able to summarize the
- 13:07:45purpose of a communications management
- 13:07:46plan. Describe the components of a
- 13:07:48communications management plan. Project
- 13:07:51Management Institute or PMI states that
- 13:07:53communications impact 90% of all project
- 13:07:56management activities. This shows
- 13:07:58effective communication is key to
- 13:08:00project success. The PMI recommends
- 13:08:02using a communications management plan
- 13:08:04to ensure communication for the project
- 13:08:06is organized and effective. A
- 13:08:08communications management plan provides
- 13:08:10the overall strategy to describe how
- 13:08:12best to communicate with each other and
- 13:08:14communicate responsibilities based on
- 13:08:16project requirements. The project
- 13:08:18manager must create the communications
- 13:08:20management plan during project planning
- 13:08:22and frequently update the plan as the
- 13:08:24project progresses. The PMI provides
- 13:08:27some input into the process of a
- 13:08:28communications management plan. Let's
- 13:08:30look at some of the purposes. Every
- 13:08:32project has its communication
- 13:08:34requirements. For example, a software
- 13:08:36development project may have very
- 13:08:37different communication requirements
- 13:08:39than a job modernization project from
- 13:08:41the HR department. The project manager
- 13:08:43will need to develop and tailor the
- 13:08:45communications management plan to
- 13:08:47support the information needs of each
- 13:08:49stakeholder or group of stakeholders and
- 13:08:51the overall project. Creating a
- 13:08:53communications management plan gives the
- 13:08:55overall communication process a
- 13:08:57documented structure. A communications
- 13:08:59management plan aids in creating a
- 13:09:01positive communication rhythm for the
- 13:09:03project. For example, when a team member
- 13:09:05knows precisely where to find a report
- 13:09:07and when to publish the report.
- 13:09:09Communication is more effective. A
- 13:09:11communications management plan provides
- 13:09:13guidance on communication at different
- 13:09:14levels. This guidance helps each
- 13:09:16stakeholder to identify the right
- 13:09:18people, the right time, and the right
- 13:09:20content level for communication. The
- 13:09:22result of this understanding is that
- 13:09:24each project stakeholder can effectively
- 13:09:26and efficiently engage with other
- 13:09:28stakeholders by promptly presenting
- 13:09:30relevant information. For example,
- 13:09:32during an internal status meeting, a
- 13:09:34project manager may need to go into all
- 13:09:36the minute details of the project.
- 13:09:38However, with a sponsor, the level of
- 13:09:40detail may need to be at a macro level,
- 13:09:42focusing only on the completion
- 13:09:43percentage. We discussed the purpose of
- 13:09:45having a communications management plan.
- 13:09:48A communications management plan
- 13:09:49template is normally available in either
- 13:09:51Microsoft Word or Excel. The PMI states
- 13:09:54that a communications management plan
- 13:09:55should have certain components. Let's
- 13:09:57see the components of a communications
- 13:09:59management plan. The communications
- 13:10:01management plan must have a project name
- 13:10:03to map the plan with the correct project
- 13:10:05title. You can add different
- 13:10:06communications items. A communications
- 13:10:09item represents a type of communication.
- 13:10:11Examples include status meetings, budget
- 13:10:13meetings, change boards, and so on. Each
- 13:10:16communications item must have an
- 13:10:18associated owner. Identifies the project
- 13:10:20team member responsible for managing the
- 13:10:22communications item. Audience describes
- 13:10:24the project team members and
- 13:10:26stakeholders who will receive the
- 13:10:27communication. Ensure to select the
- 13:10:30right people. Timing sets a schedule for
- 13:10:32the communications item. For example,
- 13:10:34weekly status meetings will occur every
- 13:10:36Wednesday from 11:00 a.m. to 11:30 a.m.
- 13:10:39Manage exceptions on need basis. Format
- 13:10:42or medium determines how the team needs
- 13:10:44to conduct the communications item. For
- 13:10:46example, face-to-face meetings, virtual
- 13:10:48meetings, emails, and so on. Purpose
- 13:10:51identifies the need for the
- 13:10:52communications item. For example, a
- 13:10:54weekly status meeting aims to review the
- 13:10:56current project status, understand
- 13:10:58potential issues, and answer any open
- 13:11:01questions. The communications management
- 13:11:03plan is frequently updated. It's a good
- 13:11:05idea to maintain the version number and
- 13:11:07date of change to maintain version
- 13:11:09control. In this video, you learned that
- 13:11:11a communications management plan is
- 13:11:13created during project planning and
- 13:11:15frequently updated. Supports the
- 13:11:17information needs of a project, provides
- 13:11:19communication strategy for the project,
- 13:11:21aids in positive communications rhythm,
- 13:11:23and helps identify the right people,
- 13:11:25time, and content level for
- 13:11:27communication. The components of a
- 13:11:29communication management plan include
- 13:11:31the project name, communications item
- 13:11:33details, version, and date. The
- 13:11:35communications item details include item
- 13:11:37description, owner, audience, timing,
- 13:11:39format or medium, and purpose.
- 13:11:44[Music]
- 13:11:51Hello everyone. I'd like to go ahead and
- 13:11:53take a few moments and present a brief
- 13:11:57demo on a communications management
- 13:12:00plan. A communications management plan
- 13:12:03is a formal part of a project management
- 13:12:06plan. And the intent of a communications
- 13:12:09management plan is to provide a roadmap
- 13:12:12for all project communications to ensure
- 13:12:15that communications gets to the right
- 13:12:18person at the right time in the right
- 13:12:20amount.
- 13:12:23According to the project management
- 13:12:24institute, a communications management
- 13:12:27plan should have an introduction. As you
- 13:12:29can see, we have the communications plan
- 13:12:32for a two-day all hands event. This is
- 13:12:35just an example. Always try to define
- 13:12:38the project because there may be
- 13:12:40multiple projects and multiple
- 13:12:42communications management plans. A
- 13:12:45communication management plan has six
- 13:12:49areas that need to be populated. The
- 13:12:52first area is what we refer to as the
- 13:12:54communications item. Sometimes called
- 13:12:57the forum. This is what you are
- 13:13:00communicating. As you can see on this
- 13:13:02particular example, we have three that
- 13:13:05are highlighted. The weekly project
- 13:13:07status meeting, the sponsor one-on-one
- 13:13:09meeting, and the weekly project status
- 13:13:11report. We have some others as well. A
- 13:13:14change control board vendor source
- 13:13:16selection conference room presentation.
- 13:13:19So the first step in developing the
- 13:13:22communications plan is step number one.
- 13:13:26Define the required communication items.
- 13:13:28As the project manager, enlist the
- 13:13:31support of your core team and try to
- 13:13:33determine what needs to be communicated
- 13:13:36and populate this first column. The
- 13:13:39second step is to determine the owners.
- 13:13:43Every communication item should have a
- 13:13:46specific owner who is responsible for
- 13:13:49planning and implementing that
- 13:13:51particular line item. In this particular
- 13:13:54case, the weekly project status meeting
- 13:13:57is going to be owned by Sanj Randell.
- 13:14:00Sanjay is going to be the individual who
- 13:14:03is empowered to go ahead and plan and
- 13:14:06implement and ensure that the weekly
- 13:14:08project status meeting happens. We have
- 13:14:12others as well. We have Roger Jones
- 13:14:14who's going to be the sponsor one-
- 13:14:16on-one meeting, the weekly project
- 13:14:18status report. By the way, a sponsor
- 13:14:21one-on-one meeting is a best practice.
- 13:14:24It is a very, very good thing for the
- 13:14:27project manager to meet periodically
- 13:14:29with the sponsor and have conversations
- 13:14:32about status and other key areas as
- 13:14:35well. The third step in developing the
- 13:14:38communications plan, as you can see over
- 13:14:40in my green column here, is to determine
- 13:14:43the audience. Here's a little bit of a
- 13:14:46tip. Everyone who's on the stakeholder
- 13:14:48register should be included in this
- 13:14:51communications plan. If you have someone
- 13:14:53on the stakeholder register who was
- 13:14:56identified having a role and
- 13:14:57responsibility and they're not on this
- 13:15:00plan, you may want to question why you
- 13:15:03have them on the stakeholder register
- 13:15:05and why you are assigning them a role
- 13:15:07and responsibility if you're not going
- 13:15:09to communicate with them. Not
- 13:15:11communicating with people on the
- 13:15:13stakeholder register to use a colloial a
- 13:15:16colloquialism is an accident waiting for
- 13:15:19a place to happen. Step number four,
- 13:15:22determine the timing. When are we going
- 13:15:25to go ahead and implement this
- 13:15:27particular communications item? Some may
- 13:15:30be weekly, some may be two times each
- 13:15:32week, some may be just a one time, such
- 13:15:35as the vendor source selection.
- 13:15:38Ensure that you understand how often
- 13:15:41this communications line item needs to
- 13:15:44occur and document it in the fourth
- 13:15:48column. The next is to complete the
- 13:15:52medium. What medium are we going to go
- 13:15:55ahead and use? And in terms of where are
- 13:15:59we going to meet? As you can see, in
- 13:16:01some cases, we have a location, the main
- 13:16:03conference room, Sarah's office. In
- 13:16:05other cases, we may actually have a
- 13:16:08technology such as SharePoint as well.
- 13:16:11So, sometimes we don't meet individually
- 13:16:14or in an office. We meet electronically
- 13:16:17using SharePoint.
- 13:16:19always end with a purpose as well. It's
- 13:16:23very very important that all of the
- 13:16:25individuals who are going to be
- 13:16:27receiving information as part of this
- 13:16:29communications plan have an
- 13:16:31understanding of the purpose why this is
- 13:16:34important as well. So once you have
- 13:16:36completed all six of these items and you
- 13:16:39have defined the project title on the
- 13:16:42top of the plan, go to step number five.
- 13:16:45Validate the plan with the audience.
- 13:16:48Have a meeting with all of these
- 13:16:50audience members. Let them know what the
- 13:16:52expectations are. Don't surprise them by
- 13:16:55sending them communications items
- 13:16:58without some kind of a heads up as well.
- 13:17:01Ensure you get some kind of verbal sign
- 13:17:05off from each one in the audience that
- 13:17:07they understand what the communication
- 13:17:10line item is, they understand the
- 13:17:12purpose of it, and they're willing to go
- 13:17:14ahead and support that particular
- 13:17:16communications line item. Once you gain
- 13:17:19that validation, publish it and follow
- 13:17:23the plan. One of the worst things you
- 13:17:25can do as a project manager is to
- 13:17:27develop this plan, put it in the project
- 13:17:29management plan and then conduct
- 13:17:32communications in a random manner. The
- 13:17:35last step in communications planning is
- 13:17:39update as needed. You'll notice on the
- 13:17:41bottom we have version and date. This
- 13:17:44plan is going to change as the project
- 13:17:47is initiated. There are going to be
- 13:17:49certain communications items that are
- 13:17:51required. But as the project progresses,
- 13:17:54more and more communications will be
- 13:17:57required and some of the prior
- 13:17:59communication items may no longer be
- 13:18:01required as well. In addition, the
- 13:18:04audience may very well change as the
- 13:18:06project progresses. Individuals who
- 13:18:08needed and required communications early
- 13:18:11in the project may no longer require
- 13:18:14these communications toward the middle
- 13:18:16and end of the project. So be consistent
- 13:18:19and keep this plan accurate. You will
- 13:18:23have an opportunity to read a scenario
- 13:18:25and develop a communications management
- 13:18:28plan based on that scenario. I highly
- 13:18:30encourage you to do your best in that
- 13:18:33lab and try to understand how this plan
- 13:18:36is developed and appreciate the overall
- 13:18:40value proposition of this plan. It's a
- 13:18:43very very important planning activity in
- 13:18:47project planning and again if you
- 13:18:50develop this communications management
- 13:18:52plan it will act as a road map and help
- 13:18:56guide effective communications. Thank
- 13:18:58you very much for your time listening to
- 13:19:00this demo and we look forward to seeing
- 13:19:03you in future demo videos. Have a great
- 13:19:06rest of your day.
- 13:19:10[Music]
- 13:19:16Welcome to expert viewpoints planning
- 13:19:18for effective virtual and in-person
- 13:19:20communications. In this video, experts
- 13:19:22and leaders will provide tips for
- 13:19:24effective communications planning,
- 13:19:25particularly in a virtual environment.
- 13:19:28What tips can you provide for effective
- 13:19:30communications planning, particularly in
- 13:19:33a virtual environment?
- 13:19:35>> Tips for effective communication
- 13:19:37planning. I wrote this first one on my
- 13:19:39cheat sheet in all uppercase letters.
- 13:19:42Look at people's calendars for their
- 13:19:45busy and free time. One of my biggest
- 13:19:48pet peeves is when I receive a calendar
- 13:19:50appointment and the person who sends it
- 13:19:53is double if not triple booking me. I am
- 13:19:56a fiend about keeping my calendar
- 13:19:58current and so when people who are
- 13:20:00scheduling meetings don't take the time
- 13:20:02to look at my calendar for free busy and
- 13:20:04I'm a required member or participant in
- 13:20:07the meeting it it just makes me nuts and
- 13:20:11I know that I can propose a new time
- 13:20:13that works in my calendar but I'm not
- 13:20:15the organizer of the meeting and so I
- 13:20:17shouldn't have to look through calendars
- 13:20:18to find that for me plus all the other
- 13:20:20participants. So that's my big one is
- 13:20:23look at calendar availability when
- 13:20:25you're booking. Second tip for effective
- 13:20:27communication.
- 13:20:29Know the time zones that your project
- 13:20:31team is in, especially if you're a
- 13:20:32global team and you have people around
- 13:20:34the world. Understand if they're going
- 13:20:36to be working in their mornings,
- 13:20:38afternoons, and evenings. And then to
- 13:20:40plan your meetings and plan your
- 13:20:42connections with them accordingly. Being
- 13:20:44sensitive to their working hours will
- 13:20:46help them be sensitive to your working
- 13:20:48hours. So also establish your own
- 13:20:51boundaries as far as what work as far as
- 13:20:53working orders go. And then make sure
- 13:20:56that you find out team holidays. Um
- 13:20:58different countries of course have
- 13:21:00different holidays and then also
- 13:21:01personal time away if people are going
- 13:21:04to take vacations. Um that also helps
- 13:21:06you plan for your time timeline how
- 13:21:09you're going to manage when people are
- 13:21:11out and more. And then last, of course,
- 13:21:14I think you've probably already heard
- 13:21:15this, but when you are in meetings, if
- 13:21:18one person turns their video on,
- 13:21:19everyone should turn their video on. Um,
- 13:21:22if people are sensitive to the room that
- 13:21:24they're in, go ahead and blur your
- 13:21:25background. Um, but do take advantage of
- 13:21:28the video. Take advantage of uh earbuds
- 13:21:31and headsets to block out noise from
- 13:21:33other places in the house. And then also
- 13:21:35if you hear dogs barking, um, make sure
- 13:21:38that you can try to s get your dogs
- 13:21:40settled down so they don't interrupt
- 13:21:42your video recording.
- 13:21:44For effective communications planning, I
- 13:21:48like to get a sense before I plan the
- 13:21:52communications of each of my
- 13:21:54stakeholders communication needs and
- 13:21:57preferences. So, I like to spend a
- 13:22:00little bit of time either one- on-one
- 13:22:02with a stakeholder or the team or even
- 13:22:06just through an email gathering the
- 13:22:09communication preferences of those
- 13:22:12people. And I like to put, you know, all
- 13:22:14of that information in a singular place
- 13:22:17that I can go back and refer to when I'm
- 13:22:20doing communications planning. And that
- 13:22:23helps me as I'm building my
- 13:22:25communications plan, think through what
- 13:22:29communications methods am I going to
- 13:22:31use, what tools am I going to use, um
- 13:22:34those sorts of things. Another thing
- 13:22:36that I am a really big fan of is I
- 13:22:38always have a communications plan
- 13:22:40template. I think it just makes having a
- 13:22:43template and always starting from that
- 13:22:45template and always kind of following
- 13:22:47the same process because you're using a
- 13:22:50template really helps you
- 13:22:54not have to think, am I forgetting
- 13:22:56something? Am I forgetting a key
- 13:22:59stakeholder? Am I forgetting a type of
- 13:23:01communication that I need to possibly
- 13:23:04include in this communications plan? But
- 13:23:06having a template just really makes
- 13:23:08things a lot easier and it makes you
- 13:23:10much more effective as you're planning
- 13:23:13those communications.
- 13:23:15Um, when it comes to planning in a
- 13:23:17virtual environment, I think
- 13:23:19understanding the tools that are at your
- 13:23:21disposal and really understanding
- 13:23:24what features they have. So, if you're,
- 13:23:28you know, having a a virtual call, a
- 13:23:31virtual video call, um,
- 13:23:34are people going to be able to view a
- 13:23:39recording? Is there a transcription
- 13:23:41service available that transcribes that
- 13:23:44recording? Where are those videos going
- 13:23:46to be saved? Are you going to need to
- 13:23:48communicate where those videos are saved
- 13:23:51after each meeting so that people can
- 13:23:54actually access them? but really kind of
- 13:23:56understanding the technology that you're
- 13:23:58using. How do you actually set up the
- 13:24:00meetings? Um, what things do people
- 13:24:03maybe need to download onto their
- 13:24:06computers before they join the first
- 13:24:08meeting and to be able to access that
- 13:24:11meeting and to be able to get on the
- 13:24:12meeting? All of those things are really
- 13:24:14important. The technology piece is
- 13:24:17really important and adding those things
- 13:24:20to your communication plan. So, if for
- 13:24:23example, you need to send out a link to
- 13:24:26the meeting recording after every
- 13:24:28meeting, it's important for you to plan
- 13:24:30for that communication in your
- 13:24:33communications plan and then potentially
- 13:24:36build a template. Build a template that
- 13:24:37says, you know, hi team, here is the the
- 13:24:40link to our meeting recording from
- 13:24:42today. You can access it here and then
- 13:24:45you can go back to that template and you
- 13:24:47already have it written. It's already
- 13:24:49done. And then when you're in your
- 13:24:50communications plan, you can send it off
- 13:24:52very quickly and be done with it. So
- 13:24:56having templates, understanding the
- 13:24:58technology, and really understanding the
- 13:25:00needs of your team, communication needs
- 13:25:03of your team and stakeholders is very
- 13:25:04important for effective communications
- 13:25:07planning.
- 13:25:08First off, make sure that you have all
- 13:25:10the right stakeholders involved. Not
- 13:25:12everybody needs to attend every meeting,
- 13:25:15needs to be on every type of email or
- 13:25:18something like that. Different types of
- 13:25:20tools that you can use. I love Slack to
- 13:25:23be honest. A lot of companies use
- 13:25:25different things like Teams have a great
- 13:25:28support system as far as a storage box
- 13:25:32uh that you put documentations into that
- 13:25:34makes it a lot easier for your team
- 13:25:36members to find information. Email,
- 13:25:39phone call. A lot of people don't call
- 13:25:40anymore. That's a great opportunity for
- 13:25:43a one-on-one session.
- 13:25:45>> Project teams should always have a
- 13:25:47discussion on preferred communication
- 13:25:49style. How frequently, what method, what
- 13:25:52has worked for them in the past, what
- 13:25:54hasn't. And even though your team will
- 13:25:56collectively decide on a communication
- 13:25:58plan, every project manager is smart
- 13:26:01enough to know that you need to learn
- 13:26:03your team members's individual
- 13:26:04preferences. For example, you don't want
- 13:26:08to upset someone by calling them
- 13:26:09unannounced at 3:30 when you know that
- 13:26:12they pick up their child every day from
- 13:26:14school during that time. Get to know
- 13:26:16your team and adapt to their styles.
- 13:26:21[Music]
- 13:26:29Welcome to planning virtual
- 13:26:30communications. After watching this
- 13:26:32video, you'll be able to explain the key
- 13:26:34indicators that measure the
- 13:26:35effectiveness of virtual meetings and
- 13:26:37summarize communications planning tips
- 13:26:39to accommodate a virtual environment.
- 13:26:42The PMI defines virtual meetings as
- 13:26:44opportunities to interact using
- 13:26:45communication technology. Virtual
- 13:26:48meetings are essential in today's work
- 13:26:49environment, such as making decisions,
- 13:26:51solving problems, responding to
- 13:26:53stakeholder requests, and providing
- 13:26:54information. Let's look at some key
- 13:26:56parameters that can help measure the
- 13:26:58effectiveness of virtual meetings. A key
- 13:27:00parameter to measure virtual meeting
- 13:27:02effectiveness is attendance. Typically,
- 13:27:04a poorly run virtual meeting tends to
- 13:27:06have fewer participants, which may often
- 13:27:08point to a lack of perceived value from
- 13:27:11the meeting and no accountability for
- 13:27:12not attending. Participants may also
- 13:27:15need help to connect to a meeting or
- 13:27:16other technology challenges. Another
- 13:27:19parameter is the level of participant
- 13:27:21interaction. When people are engaged,
- 13:27:22they're attentive, contributing, and
- 13:27:24maximizing the value of the meeting or
- 13:27:26event. Participation in polls is another
- 13:27:29parameter to measure the effectiveness
- 13:27:30of virtual meetings. Lower participation
- 13:27:33may indicate a lack of focus or
- 13:27:35interest. Make sure to conduct periodic
- 13:27:37polls. Strive to attain 100%
- 13:27:39participation.
- 13:27:41The most important parameter to measure
- 13:27:43the effectiveness of a virtual meeting
- 13:27:44is the outcome. It's important to
- 13:27:46validate if the meeting achieved its
- 13:27:48intended purpose. If not, it's important
- 13:27:50to understand why the purpose was not
- 13:27:52achieved and continuously improve. We
- 13:27:54discussed the measurement parameters for
- 13:27:56the effectiveness of virtual meetings.
- 13:27:58Next, let's look at some tips on
- 13:27:59improving the effectiveness of virtual
- 13:28:01meetings. The first tip to improve
- 13:28:03virtual meeting effectiveness is to
- 13:28:05establish ground rules. Ground rules
- 13:28:07help project teams to communicate
- 13:28:08effectively, collaborate, and make
- 13:28:10decisions during a virtual meeting. Some
- 13:28:12examples of ground rules include be
- 13:28:14punctual, keep cameras on, start and end
- 13:28:17on time, ask relevant questions, and
- 13:28:19mute when others speak. Every
- 13:28:21participant must be well conversant with
- 13:28:23using the technology or software for the
- 13:28:26meeting. Conduct technology training if
- 13:28:28required. Another tip to improve the
- 13:28:30effectiveness of virtual meetings is to
- 13:28:32ensure that every meeting has a well-
- 13:28:33definfined agenda. Make sure to publish
- 13:28:35the meeting agenda to all participants.
- 13:28:38The agenda should have clear objectives
- 13:28:40stated to help align all participants.
- 13:28:42At the end of the meeting, the project
- 13:28:44manager must publish the meeting
- 13:28:45minutes. Here's an example of a clearly
- 13:28:47defined agenda. Having the right people
- 13:28:50in a meeting is essential to be
- 13:28:51effective. Determine who needs to attend
- 13:28:53the meeting and ensure the participant
- 13:28:55understands why their attendance is
- 13:28:57critical. For example, when setting up a
- 13:28:59weekly project status meeting, the
- 13:29:01project manager must invite the team
- 13:29:03members. However, the project sponsor or
- 13:29:06senior leadership may be optional. Only
- 13:29:08invite participants who need to be at
- 13:29:10the meeting. When selecting the right
- 13:29:12participants, ensure backup participants
- 13:29:14in case a key participant cannot attend.
- 13:29:16Also ensure that the proxy identified is
- 13:29:19empowered to make decisions. Another tip
- 13:29:21to make the virtual meetings effective
- 13:29:23is to involve participants. Here are
- 13:29:25some examples to involve participants.
- 13:29:27Divide responsibility for presenting
- 13:29:29topics among the participants. This will
- 13:29:31increase overall engagement. Encourage
- 13:29:33participants to share ideas and thoughts
- 13:29:35via the chat function. This will bring
- 13:29:37openness and engage the participants.
- 13:29:39Schedule periodic check-ins with key
- 13:29:41participants. This will help solicit
- 13:29:43feedback throughout the meeting.
- 13:29:45Leverage technology. Introducing
- 13:29:47periodic breakout room discussions may
- 13:29:49increase interaction and help break the
- 13:29:51monotony of the meeting. In this video,
- 13:29:54you'll learn that parameters to measure
- 13:29:55the effectiveness of virtual meetings
- 13:29:57include attendance, level of participant
- 13:29:59interaction, polls, and outcomes. Tips
- 13:30:02to improve the effectiveness of virtual
- 13:30:03meetings include establish ground rules,
- 13:30:06technology awareness, meeting agenda,
- 13:30:08participant selection, proxy participant
- 13:30:11identification, involve participants.
- 13:30:16[Music]
- 13:30:23Welcome to effective status reporting.
- 13:30:26After watching this video, you'll be
- 13:30:27able to describe the need for periodic
- 13:30:29work performance reports, explain the
- 13:30:32significance of status reporting, and
- 13:30:33describe the attributes of a good status
- 13:30:35report. The Project Management
- 13:30:37Institute, PMI, discusses the need for
- 13:30:39periodic work performance reports. These
- 13:30:42reports include status reports, memos,
- 13:30:44justifications, dashboards, and more.
- 13:30:47Periodic work performance reports
- 13:30:48support the following. Better
- 13:30:50decision-making, identifying and raising
- 13:30:52issues, defining required actions, and
- 13:30:54creating awareness in the team and other
- 13:30:56stakeholders. Status reports are one of
- 13:30:58the most frequently used categories of
- 13:31:00periodic work performance reports.
- 13:31:02According to PMI, a status report
- 13:31:04provides the status of a project. The
- 13:31:06report may include information on
- 13:31:08progress since the last report and
- 13:31:10forecasts for cost and schedule
- 13:31:12performance. Typically, a status report
- 13:31:14is created weekly. However, the
- 13:31:16frequency may increase or decrease
- 13:31:18depending on the project requirement. It
- 13:31:20is important to document the definition
- 13:31:22and need for status reporting and its
- 13:31:24frequency in the communications
- 13:31:25management plan during the project
- 13:31:27planning phase. The project manager is
- 13:31:30responsible for establishing status
- 13:31:32reporting formats and submission
- 13:31:33schedules. In most cases, organizations
- 13:31:36use a standard status report template
- 13:31:38across projects. For the status report
- 13:31:40to be effective, it should have some
- 13:31:42attributes. Let's look at these
- 13:31:43attributes. The status report should
- 13:31:45have an audience focus. Ensure to tailor
- 13:31:47content according to the audience. For
- 13:31:49example, a weekly status report may
- 13:31:51contain several line items for
- 13:31:53development as the audience is all
- 13:31:54project team members. At the same time,
- 13:31:56a monthly project report to senior
- 13:31:58management may contain highle milestone
- 13:32:00details. Another key attribute of an
- 13:32:03effective status report is that it is
- 13:32:05short. Ensure that the status report is
- 13:32:07one page or shorter. Use links to review
- 13:32:09details if needed. It is also important
- 13:32:12to format a status report for better
- 13:32:14readability. Share the essential
- 13:32:16information first followed by secondary
- 13:32:18information. For example, a milestone
- 13:32:20achieved or a requirement change may be
- 13:32:23something to highlight at the start of
- 13:32:24the report. You can also add a highle
- 13:32:26summary of the project areas. Adding
- 13:32:28factual data to the status report is
- 13:32:30important. However, make sure you only
- 13:32:32add information stakeholders require.
- 13:32:34For example, summarize the development
- 13:32:36status instead of providing a line by
- 13:32:38line detail. Use graphs or visuals to
- 13:32:41improve readability.
- 13:32:43Varied audiences such as technical,
- 13:32:45non-technical, senior, or junior will
- 13:32:47use the status report. Keep the language
- 13:32:49simple to enable varied audiences to
- 13:32:51understand the status report. Limit the
- 13:32:53use of technical jargon. Add a glossery
- 13:32:56at the end of the status report. Use
- 13:32:58this section to add definitions for
- 13:32:59technical jargon. Also add legend
- 13:33:02descriptions for any graphs or visual
- 13:33:03aids. A project team and stakeholders
- 13:33:06may include people with disabilities
- 13:33:08such as color blindness. Make the report
- 13:33:10inclusive. Ensure to use symbols along
- 13:33:12with colors to improve readability for
- 13:33:14all audiences. Putting a status report
- 13:33:16together takes time. Make sure to set
- 13:33:18realistic expectations with team members
- 13:33:20to receive all information. Similarly,
- 13:33:23set realistic expectations with
- 13:33:25stakeholders for sharing the reports.
- 13:33:27Ensure the author takes accountability.
- 13:33:29The project manager may delegate status
- 13:33:31report collection and distribution
- 13:33:33responsibility to a project core team
- 13:33:35member. However, the project manager
- 13:33:37remains accountable for the quality of
- 13:33:39the report.
- 13:33:41Here's an example of a status report. In
- 13:33:44this video, you learned that periodic
- 13:33:46work performance reports help in various
- 13:33:48aspects of project management, including
- 13:33:50decision-making and issue identification
- 13:33:52and resolution. The status report is a
- 13:33:55frequently used periodic work report to
- 13:33:57provide a project's current status. The
- 13:33:59attributes of a good status report
- 13:34:01include the following. Focuses on the
- 13:34:03right audience. It is short and to the
- 13:34:05point. Starts with the essential
- 13:34:06information. Contains factual data. Uses
- 13:34:09simple language. Sets realistic
- 13:34:11expectations. Adheres to accessibility
- 13:34:14norms. Contains a glossery if needed.
- 13:34:17And ensures report credibility.
- 13:34:21[Music]
- 13:34:29Hello everyone and welcome to a quick
- 13:34:31demonstration on a project status
- 13:34:34report. Before we begin, let's go ahead
- 13:34:37and define the purpose of project status
- 13:34:39reports. First and foremost is to ensure
- 13:34:42current status is understood by all key
- 13:34:45stakeholders. Secondly, a good status
- 13:34:48report can help maintain interest and
- 13:34:50commitment levels. And third, a status
- 13:34:53report should be a tool to address
- 13:34:55issues and help needed. We have an
- 13:34:58example of a one-page status report. And
- 13:35:01let me repeat that last phrase, one
- 13:35:04page. The best status reports are short.
- 13:35:08What goes into a status report? To begin
- 13:35:11with, we should always have the project
- 13:35:14identifier or name. In this particular
- 13:35:17case, we have the ABC company all hands
- 13:35:20meeting. The status report should also
- 13:35:23be dated. Status reports are not a
- 13:35:26oneandone. You're going to go ahead and
- 13:35:28submit periodic status reports and they
- 13:35:30will build upon one another. Always
- 13:35:33define your name and your organization.
- 13:35:37In most cases, the project manager is
- 13:35:39the individual who submits the status
- 13:35:41report. In this partic in this
- 13:35:44particular case, we have Sarah Wilson
- 13:35:46who is in operations.
- 13:35:48The next area is very very important
- 13:35:51deliverable status. And the best method
- 13:35:54to report deliverable status is using
- 13:35:57what we call traffic light reporting
- 13:35:59which is red, yellow and green. You'll
- 13:36:02notice that we have a overview of what
- 13:36:05red, yellow, and green mean. Provide a
- 13:36:09definition that is suitable to your
- 13:36:12particular project. The definitions that
- 13:36:15you see here may work for you or you may
- 13:36:18want to go ahead and update them and
- 13:36:20make them more specific for the project
- 13:36:22that you are managing. But the bottom
- 13:36:24line is this. Ensure that when people
- 13:36:27are reporting green, red, and yellow
- 13:36:30that everyone is using the same
- 13:36:33definition.
- 13:36:34Color codes are very, very effective.
- 13:36:38The three key deliverable status
- 13:36:40indicators that most stakeholders are
- 13:36:43going to be interested in is scope,
- 13:36:46schedule, and budget. That's our
- 13:36:48triangle in a project.
- 13:36:51What we want to do is to define the
- 13:36:54current health of the project in terms
- 13:36:56of scope, schedule, and budget. And we
- 13:36:59also want to show how this particular
- 13:37:02status is trending. You'll notice in
- 13:37:05this example we have scope is currently
- 13:37:07yellow and trending yellow. Schedule is
- 13:37:10fine green and green. Budget is
- 13:37:12currently green. However, it's trending
- 13:37:15toward red. What follows after your
- 13:37:19status is help needed. One of the things
- 13:37:23that we want to do is to describe the
- 13:37:25help needed. And help needed is any help
- 13:37:28that will allow us to stay green or
- 13:37:32return to green. Normally a best
- 13:37:35practice is to describe the help needed
- 13:37:37in terms of a must-have, a should have
- 13:37:40or a like to have. Everything should not
- 13:37:43be a must-have. So in this particular
- 13:37:46case, we have a must-have. We need to
- 13:37:48finalize the speaker agenda. And who is
- 13:37:51the source for this help? the CEO and
- 13:37:54operations manager. You'll notice above
- 13:37:57we had scope yellow and yellow. One of
- 13:38:00the reasons for that is because the
- 13:38:02speaker agenda has not yet been
- 13:38:04finalized. A should have. We need to
- 13:38:07identify alternative caterer to meet
- 13:38:09some dietary needs. And this is again
- 13:38:11the operations manager. And then we have
- 13:38:14another mustave. We may need an
- 13:38:16additional $2,000. The initial
- 13:38:18refreshment estimate was too low. and
- 13:38:21that is assigned to the finance lead.
- 13:38:23You'll notice our budget is currently
- 13:38:25green, but it is trending toward red
- 13:38:27because we realize that we are going to
- 13:38:29have a funding shortfall. The next area
- 13:38:33is for risk. What are some new risks and
- 13:38:36changes since the last report? So, we
- 13:38:38have two risks that we can add. Key
- 13:38:41personnel absences may impact the
- 13:38:44overall quality of the project and
- 13:38:47limited gluten-free food choices is
- 13:38:50driving some of the catering cost
- 13:38:52overruns. However, we had a risk that we
- 13:38:55had reported in our last status report.
- 13:38:58AV configuration issues have now been
- 13:39:02overcome. What are some issues? What is
- 13:39:05an issue? That is a risk that occurred
- 13:39:07or questions you need to have responses
- 13:39:10for. The food cost estimates were higher
- 13:39:12than planned. That's no longer a risk.
- 13:39:15That is an issue. We need to know where
- 13:39:18to fit the motivational speaker in the
- 13:39:20agenda as well. Are there any recent or
- 13:39:23pending decisions impacting the project?
- 13:39:26Yes, finalization of required speakers
- 13:39:29is needed to plan the agenda. And
- 13:39:31finally, any kind of comments. And this
- 13:39:33may seem redundant, but it's not a bad
- 13:39:35thing to repeat good news or to
- 13:39:38reiterate perhaps bad news or help
- 13:39:41needed. The AV issues previously
- 13:39:43reported were resolved and the
- 13:39:45motivational speaker was identified.
- 13:39:48Before we close this demo, just five key
- 13:39:51notes. Number one, keep the report
- 13:39:53brief. Shorter reports are much easier
- 13:39:56to understand. Number two, traffic light
- 13:39:59reporting green, yellow, and red is a
- 13:40:02best practice. It is great to use the
- 13:40:04colors as you saw in the demo status
- 13:40:07report that we just shared. However,
- 13:40:09remember that some people cannot see
- 13:40:11colors well, so add the verbiage. Third,
- 13:40:14share the most important information
- 13:40:17first. People normally read from top to
- 13:40:20bottom. Next, determine the optimal
- 13:40:23reporting frequency based on the needs
- 13:40:25of the project. If status is slowly
- 13:40:27changing, perhaps an every other week
- 13:40:30status reporting schedule will suffice.
- 13:40:33And finally, ensure the status report is
- 13:40:35targeted at the stakeholders who need
- 13:40:37the information. Ensure these
- 13:40:39stakeholders have access to the report.
- 13:40:43This concludes our demo on status
- 13:40:46reporting. You will have the opportunity
- 13:40:48to read a scenario, analyze this
- 13:40:51scenario, and prepare a status report as
- 13:40:54part of your course lab requirements.
- 13:40:58Thank you for your attention. Have a
- 13:41:00great rest of your day, and we look
- 13:41:01forward to seeing you again for future
- 13:41:03demonstrations.
- 13:41:07[Music]
- 13:41:16Hello everyone. In our last video, we
- 13:41:18discussed four communication styles. The
- 13:41:22purpose of this demo is to go ahead and
- 13:41:24share with you how to complete a survey
- 13:41:27that will be presented to you in an
- 13:41:30upcoming lab. This particular survey
- 13:41:32will give you an opportunity to
- 13:41:34determine what your primary
- 13:41:36communication styles are.
- 13:41:39This particular demo will walk you
- 13:41:41through the four different styles,
- 13:41:44analytical, structural,
- 13:41:46conceptual, and social, and show you how
- 13:41:49to complete this survey and to attain
- 13:41:53your results.
- 13:41:55Each of the four styles presents eight
- 13:41:58different statements for you to review.
- 13:42:01Review each statement and try to answer
- 13:42:03them as honestly as possible. Don't
- 13:42:06answer them in terms of how you would
- 13:42:09like to be, but how you truly are. For
- 13:42:12each particular statement, you will
- 13:42:14strongly agree, that's five points, or
- 13:42:17agree, four points, three neither agree
- 13:42:21nor disagree, two moderately disagree,
- 13:42:24or one strongly disagree. So with that,
- 13:42:26let's go ahead and take a look at a
- 13:42:28sample. The analytical statements were
- 13:42:32completed by this individual. They read
- 13:42:35each particular statement. Statement
- 13:42:37number one, the accuracy of the work is
- 13:42:39critical. This individual felt that they
- 13:42:42would strongly agree with this statement
- 13:42:44and they put an X or whatever you want
- 13:42:47to go ahead and put into the five
- 13:42:49column. The second question simply
- 13:42:51communicate the bottom line to me.
- 13:42:53Again, they felt that they would
- 13:42:55strongly agree with this statement. They
- 13:42:58had a few where they agreed, not
- 13:43:01strongly, but they agreed. that was
- 13:43:03placed in the four column and there were
- 13:43:06a few statements where they neither
- 13:43:07agreed or disagreed. They were rather
- 13:43:10neutral on this. At the end of
- 13:43:13completing the eight statements and
- 13:43:16scoring them, they calculated their
- 13:43:18score. They took a look at their fives
- 13:43:21and went 5 10 15. Then they counted
- 13:43:25their fours, eight more for 23. and then
- 13:43:28they added nine points for the three for
- 13:43:31a total of 32. Their total score in
- 13:43:34analytical was 32.
- 13:43:37They repeated the same process for the
- 13:43:39structural style. They responded to the
- 13:43:41eight statements. They placed their
- 13:43:45opinion in one of the applicable
- 13:43:48columns. They totaled up their total
- 13:43:51score and in structural they scored a
- 13:43:5330.
- 13:43:55They then went to the conceptual style.
- 13:43:58Again, they responded to eight
- 13:44:00statements. They put their marks in the
- 13:44:03appropriate column based on their level
- 13:44:05of agreement or disagreement or
- 13:44:07somewhere in between. And in conceptual,
- 13:44:10they scored a 27. And finally, they
- 13:44:13responded to the eight statements in the
- 13:44:16social style as well. They responded in
- 13:44:19columns 5, 4, and three based on their
- 13:44:22level of agreement or disagreement. and
- 13:44:24came up with a total of 29.
- 13:44:27They have now completed their survey for
- 13:44:30all of the statements for all four
- 13:44:32styles. The next step is to add up your
- 13:44:36total scores. They scored 32 in
- 13:44:39analytical, 30 in structural, 27 in
- 13:44:42conceptual, and 29 in social. That is a
- 13:44:46total of 118 points. Remember that
- 13:44:50number. And now go back to the beginning
- 13:44:53of the survey. The second step is to
- 13:44:56take your total score in each particular
- 13:44:58style, in this case analytical, and
- 13:45:01divide it by the total score you just
- 13:45:03calculated, 118.
- 13:45:05That comes out to 27.2%.
- 13:45:10Repeat this for structural. 30 divided
- 13:45:13by your total score of 118 comes out to
- 13:45:1625.4%.
- 13:45:19Repeat this for conceptual. 27 / 118 =
- 13:45:2422.9%.
- 13:45:26And 29 / 118 equals 24.6.
- 13:45:32We now have our percentages which should
- 13:45:35add up to 100 plus or minus based on
- 13:45:39rounding. A score of 25% or over
- 13:45:45means that you have a preference for
- 13:45:48this particular communication style. The
- 13:45:50individual who completed this survey
- 13:45:52scored 27.2%
- 13:45:55in analytical. This is above 25%. This
- 13:45:58individual has a preference for this
- 13:46:01criteria. The individual in structural
- 13:46:04scored 25.4%.
- 13:46:07That's not a lot above 25%, but it still
- 13:46:10is a preference.
- 13:46:12In conceptual, however, they scored
- 13:46:1422.9%.
- 13:46:16That doesn't mean that they don't
- 13:46:18appreciate any of the aspects of
- 13:46:20conceptual thinking or styles, but it is
- 13:46:23not a preference. And they scored 24.6%
- 13:46:27in social. Again, very close to 25%.
- 13:46:31But not close enough. This is not a
- 13:46:34preference as well. When you complete
- 13:46:36your survey and complete all of your
- 13:46:39percentages, we do have some tips for
- 13:46:42communicating with each style. For
- 13:46:44example, if you scored high in
- 13:46:47analytical, and high again means 25% or
- 13:46:50above, read through these particular
- 13:46:53tips. Chances are pretty good that
- 13:46:55you're going to agree with most of these
- 13:46:57tips in terms of how you prefer to
- 13:47:00communicate. Do the same for the
- 13:47:02structural, conceptual, and social. In
- 13:47:05this particular example, the individual
- 13:47:08did not score 25% and conceptual and not
- 13:47:1125% in social. There may be a few
- 13:47:14bullets that are agreed with, but for
- 13:47:17the most part, the majority of these
- 13:47:19bullets are probably not going to be
- 13:47:20primary considerations for you when it
- 13:47:23comes to determining your communication
- 13:47:25style. Have fun in the laboratory. learn
- 13:47:29a little bit about yourself and your
- 13:47:31communication style. And in the
- 13:47:33laboratory, we highly encourage you to
- 13:47:35go ahead and share your results with
- 13:47:37others as well. Thank you for attention
- 13:47:39to this demo and we look forward to
- 13:47:42seeing you in future demos. Have a great
- 13:47:44day.
- 13:47:48[Music]
- 13:47:56Welcome to Leadership Essentials. After
- 13:47:58watching this video, you'll be able to
- 13:47:59define the key attributes and skills of
- 13:48:02a good leader, explain the attributes of
- 13:48:04a servant leader, and describe specific
- 13:48:06leadership competencies that can give
- 13:48:07your project an advantage. A project has
- 13:48:10different leadership roles such as
- 13:48:11management and leadership. Management
- 13:48:13focuses on ways to meet project
- 13:48:15objectives. Some ways include
- 13:48:17implementing effective processes,
- 13:48:18planning, coordinating, measuring, and
- 13:48:20monitoring work. Leadership focuses on
- 13:48:22people. This position includes
- 13:48:24influencing, motivating, listening,
- 13:48:26enabling, and other activities dealing
- 13:48:28with the team. As you have seen, a
- 13:48:30project manager plays a management role
- 13:48:32because they must be a good leader. The
- 13:48:34project management institute or PMI
- 13:48:36provides a list of key traits and
- 13:48:38activities of a successful leader. Every
- 13:48:40project manager must develop these
- 13:48:42traits to be successful. Let's look at
- 13:48:44the traits and activities of a
- 13:48:45successful leader. One trait of
- 13:48:47successful leaders is that they create
- 13:48:49and maintain a vision and motivate
- 13:48:51others. For example, a project manager
- 13:48:53must ensure a clear project goal. In
- 13:48:55addition, the project manager must
- 13:48:57create a healthy work environment filled
- 13:48:59with empowerment and skill proficiency
- 13:49:00which motivates the team. Another key
- 13:49:03trait of successful leadership is
- 13:49:05identifying, addressing, and solving
- 13:49:06challenges. A project manager must be a
- 13:49:09problem solver. For example, if the
- 13:49:10client complains about a team member,
- 13:49:12the project manager must fully
- 13:49:14understand and assess the situation
- 13:49:16before providing a solution. Leaders
- 13:49:18uphold levels of commitment by
- 13:49:20collaborating with team members. For
- 13:49:22example, a project manager must
- 13:49:23facilitate collaboration between team
- 13:49:25members and steer everyone toward a
- 13:49:27common goal. The PMI describes some key
- 13:49:29interpersonal skills as traits of a
- 13:49:31successful leader, including emotional
- 13:49:34intelligence, decision-making, and
- 13:49:35conflict management. Let's review these
- 13:49:37traits. Emotional intelligence or EQ is
- 13:49:40a leadership trait that increases social
- 13:49:42awareness, improves social skills, aids
- 13:49:44in self-improvement, and increases
- 13:49:46empathy. For example, a project manager
- 13:49:48with high emotional intelligence acts
- 13:49:50after a thoughtful situation assessment.
- 13:49:52This behavior makes it easy for the
- 13:49:54project manager to establish trust and
- 13:49:56build better relationships with the team
- 13:49:58and stakeholders. Decision-m is a
- 13:50:00crucial leadership trait. A leader must
- 13:50:03clearly define their decisions and plans
- 13:50:05and include the team in decision-m. For
- 13:50:07example, a project manager determines
- 13:50:09that the skills required to complete the
- 13:50:11project are unavailable in the existing
- 13:50:13team. In this situation, the project
- 13:50:15manager asks the team for their input
- 13:50:17and may decide that training the current
- 13:50:19team is a good option as timelines are
- 13:50:21flexible and the option aligns with the
- 13:50:23vision of the larger organization.
- 13:50:25Finally, conflict management keeps
- 13:50:27communications respectful and focused.
- 13:50:29Leaders always encourage dialogue that
- 13:50:31will move the project forward and
- 13:50:33intervene when conflict turns negative.
- 13:50:35Consider this scenario. The project
- 13:50:37deliverable is due next Monday. Alex
- 13:50:39needs Julia's input to complete the task
- 13:50:41to complete the deliverable. Julia has
- 13:50:44not responded to any of Alex's messages
- 13:50:46or emails. Alex is annoyed but continues
- 13:50:48with other tasks. The project manager,
- 13:50:50Chris, notices this and objectively
- 13:50:52lists the tasks to complete and assigns
- 13:50:54them to the respective team members.
- 13:50:56Further, Chris encourages Alex and Julia
- 13:50:58to have a conversation to sort out their
- 13:51:00differences. Another leadership trait is
- 13:51:03the ability to tailor a leadership
- 13:51:05style. For example, at the start of a
- 13:51:07project, the project manager may need to
- 13:51:08be a visionary to set and communicate
- 13:51:10the project goal to the team. However,
- 13:51:12when working with a junior team member,
- 13:51:14the project manager may need to be
- 13:51:16directive. Next, let's understand
- 13:51:18servant leadership. Servant leadership
- 13:51:20allows teams to self-organize,
- 13:51:22empowering the team to make their own
- 13:51:23decisions. There are three leadership
- 13:51:25behaviors specific to a servant leader.
- 13:51:28One, obstacle removal. Servant leaders
- 13:51:30encourage open communication to help
- 13:51:32identify blockers or impediments. If the
- 13:51:35team lacks resources, address the
- 13:51:37shortage immediately. Two, diversion
- 13:51:40shield. Servant leaders protect the
- 13:51:42project team from internal and external
- 13:51:44distractions to help the team remain
- 13:51:45productive and focused. Interface with
- 13:51:48stakeholders who have questions so the
- 13:51:49team can focus on the job. Three,
- 13:51:51encouragement and development
- 13:51:53opportunities. Servant leaders provide
- 13:51:55tools, rewards, and encouragement to
- 13:51:57maintain team satisfaction and
- 13:51:58productivity. The project manager must
- 13:52:00never take the team for granted. A
- 13:52:02leader must possess at least some
- 13:52:04competencies. These competencies include
- 13:52:06transparency. A project manager must be
- 13:52:09transparent in their actions and thought
- 13:52:10processes. Integrity. A project manager
- 13:52:13must be ethical and honest. The project
- 13:52:15manager must always share accurate and
- 13:52:17timely information. Respect. A project
- 13:52:20manager must respect others skills,
- 13:52:22thinking, and expertise. The team is
- 13:52:24more effective than the individual when
- 13:52:26they work together and share. Positive
- 13:52:28discourse. A project manager must create
- 13:52:30solutions that work for everyone and be
- 13:52:32inclusive. Share the decision and the
- 13:52:34rationale behind it. Support. A project
- 13:52:37manager must build team trust and
- 13:52:38proactively identify and remove
- 13:52:40impediments. Trust leads to open and
- 13:52:42honest conversation and collaboration.
- 13:52:45Courage. A project manager must show
- 13:52:46courage and conviction and be willing to
- 13:52:48take the lead when needed or follow when
- 13:52:50it makes sense. Celebrate success. A
- 13:52:53project manager must recognize and
- 13:52:55acknowledge team contributions in real
- 13:52:57time and never take credit for the
- 13:52:59contributions of others. In this video,
- 13:53:01you learned that management focuses on
- 13:53:03meeting project objectives and
- 13:53:05leadership focuses on people. Key leader
- 13:53:07traits and activities include vision and
- 13:53:09motivation, problem solving, commitment,
- 13:53:11and collaboration. Interpersonal skills
- 13:53:14including emotional intelligence,
- 13:53:16decision-making, and conflict
- 13:53:17management, ability to tailor leadership
- 13:53:20style. Servant leadership behaviors
- 13:53:22include obstacle removal, being a
- 13:53:23diversion, encouraging, and developing
- 13:53:25team member skills. Leader competencies
- 13:53:27include transparency, integrity,
- 13:53:29respect, positive discourse, support,
- 13:53:32courage, and celebrate success.
- 13:53:36[Music]
- 13:53:43Welcome to expert viewpoints. Why
- 13:53:45leadership? In this video, we will hear
- 13:53:47leaders and experts discuss the benefits
- 13:53:49of good leadership.
- 13:53:51What are the benefits of good
- 13:53:52leadership?
- 13:53:54I think one of the big benefits of good
- 13:53:56leadership is increased productivity.
- 13:53:59You see increased productivity when you
- 13:54:01set goals, when you set clear
- 13:54:03expectations,
- 13:54:05and when you um give feedback and you
- 13:54:07give valid feedback that's constructive
- 13:54:09and to the point, that's not overly
- 13:54:12critical and not um personal. So, by
- 13:54:16providing clear expectations and the
- 13:54:18goals of what needs to get done, you're
- 13:54:20really setting your team up for success.
- 13:54:22you're enabling them to be as efficient
- 13:54:24as possible to get things done in a
- 13:54:27possibly faster timeline than what you
- 13:54:29originally anticipated and that's going
- 13:54:31to produce better outcomes for your
- 13:54:33organization.
- 13:54:35The other good thing or the other
- 13:54:37benefit of good leadership is improve
- 13:54:40morale. So the clearer you are, the more
- 13:54:42concise you are, the more open you are
- 13:54:45about what your expectations are as a
- 13:54:47leader and as a a leader of team
- 13:54:50members, the the higher the morale is
- 13:54:52going to be. There's not going to be
- 13:54:54surprises when you have feedback that
- 13:54:56they may need to change something. Um,
- 13:54:58and the feedback would be given in good
- 13:55:00faith. And so the more open you are, the
- 13:55:03more honest you are, and the more you
- 13:55:06set expectations about what's good,
- 13:55:08better, best, the higher the morale in
- 13:55:10your company and your organization is
- 13:55:12going to be. And then a third one is
- 13:55:16those two combined. So, uh, setting
- 13:55:18expectations, being clear about that,
- 13:55:21leading to better productivity,
- 13:55:23increased morale, you're also just going
- 13:55:25to be able to build better
- 13:55:26relationships. Trust is something that
- 13:55:28you have to earn. And so by being open,
- 13:55:32by being um clear about what your
- 13:55:35expectations are, you're going to start
- 13:55:37building trust within your project team
- 13:55:39and then your client is going to see
- 13:55:40that as well because you'll have a happy
- 13:55:43team. Happy team is going to produce
- 13:55:45great results and then that's going to
- 13:55:47give you a happy client. I think that
- 13:55:50the benefits of great leadership
- 13:55:51particularly in project management are
- 13:55:55uh high-erforming teams and projects
- 13:55:58that are completed successfully. So a
- 13:56:01successful project being a project
- 13:56:02that's completed on time, on budget, and
- 13:56:06with high quality deliverables where it
- 13:56:09meets the project objectives. And I
- 13:56:11think that great leadership does this
- 13:56:14because great leaders are able to really
- 13:56:18bring people together in a way that just
- 13:56:22enhances the strengths of each of the
- 13:56:25members on the team and minimizes the
- 13:56:28weaknesses of members on the teams.
- 13:56:31Great leaders help the whole team be
- 13:56:36greater than the sum of its individual
- 13:56:37parts. And they're able to bring out the
- 13:56:41best in people and help teams
- 13:56:44communicate effectively about challenges
- 13:56:46and issues that they're facing or work
- 13:56:48that needs to be done. And
- 13:56:52that is one of the benefits of great
- 13:56:54leadership. And I think those high
- 13:56:56performing teams as well as a leaders a
- 13:56:59great leader's ability to really manage
- 13:57:02stakeholders well to have a high
- 13:57:07overarching view of an entire project
- 13:57:11while also being able to really
- 13:57:13understand and see the details helps
- 13:57:16teams get projects done on time, on
- 13:57:20budget, and in a high quality way. and
- 13:57:24really meet the project objectives in a
- 13:57:27way that makes the project successful.
- 13:57:30>> In my opinion, the number one benefit of
- 13:57:33effective leadership is the ability to
- 13:57:36motivate the team. As a leader, you need
- 13:57:39to understand that intrinsic motivation
- 13:57:42must come from within or inside the
- 13:57:46individual.
- 13:57:47Successful leadership allows all
- 13:57:49stakeholders and team members to believe
- 13:57:52they will achieve something of value by
- 13:57:55being part of the project. It allows the
- 13:57:58individual to feel positively
- 13:58:00challenged, believe in the work that
- 13:58:03they are doing and strive to make a
- 13:58:06difference. It allows for
- 13:58:09self-direction,
- 13:58:10acceptance of responsibility and
- 13:58:13personal growth. Question number two,
- 13:58:16what distinguishes a good leader from a
- 13:58:19poor leader? In a word, focus. A good,
- 13:58:24let me say great leader focuses on the
- 13:58:26needs and success of others over self.
- 13:58:30The great leader identifies and removes
- 13:58:33obstacles to success before they impact
- 13:58:36the project and the individual
- 13:58:38negatively. They eliminate factors that
- 13:58:41may prevent the individual from
- 13:58:43successfully accomplishing the work of
- 13:58:45the project. And finally, they provide
- 13:58:48encouragement and opportunities for each
- 13:58:51member of the team to develop their
- 13:58:53skills and ultimately thrive.
- 13:58:56>> Benefits of good leadership can add
- 13:58:58value to teams communication,
- 13:59:00productivity, and create a better and
- 13:59:03more motivating work environment.
- 13:59:09[Music]
- 13:59:16Welcome to expert viewpoints leading
- 13:59:18successfully. In this video, experts and
- 13:59:20leaders will describe how effective
- 13:59:22leadership supported their success when
- 13:59:24managing projects.
- 13:59:26Provide examples of effective leadership
- 13:59:28that allowed you to succeed in projects.
- 13:59:31Well, a key aspect of effective
- 13:59:34leadership and arguably the most
- 13:59:36important is to create a vision for the
- 13:59:39project that the team can embrace. To do
- 13:59:42so, you need to both understand the
- 13:59:46purpose of the project and be able to
- 13:59:49relay that purpose to the team. When the
- 13:59:52team understands the purpose and buys
- 13:59:55into the value, then they are willing to
- 13:59:58commit their time and energy in the
- 14:00:01right direction. I recall a project for
- 14:00:04a large technology company that was
- 14:00:06intended to upgrade numerous aspects of
- 14:00:10the company's wide area network. There
- 14:00:13were multiple stakeholders and each had
- 14:00:15their own understanding of what the
- 14:00:17project would deliver.
- 14:00:20I was asked to be the program manager. I
- 14:00:23gathered the key stakeholders together
- 14:00:25and we had a twour brainstorming session
- 14:00:29where we collaboratively defined the
- 14:00:32project's purpose, how we would measure
- 14:00:35success, how the future state would
- 14:00:37compare to the current state, and
- 14:00:40finally how we will ensure we do not
- 14:00:42drift from that vision. In the end, we
- 14:00:46were all finally on the same page.
- 14:00:49expectations were established that were
- 14:00:51motivational and provided a roadmap to
- 14:00:54the ultimate project success.
- 14:00:58>> Uh some examples of things about me that
- 14:01:01I think make me an effective leader.
- 14:01:03One, I'm very approachable. Um I work to
- 14:01:06make people try to make people
- 14:01:08comfortable in whatever setting we're
- 14:01:10in, whether it's on the phone, whether
- 14:01:11it's an email or uh face to face in a
- 14:01:15meeting. Eye contact is critical. Um,
- 14:01:18and if you're not don't have your video
- 14:01:20on, then don't multitask. So, to me, eye
- 14:01:24contact when you're in a meeting or when
- 14:01:26you're on a video call, very crucial to
- 14:01:28show that you're engaged, that you're
- 14:01:30listening, that you're paying attention,
- 14:01:32that you're processing what's being
- 14:01:34shared with you. If you don't have your
- 14:01:36video on and you're not in face to face,
- 14:01:40then do not multitask because you will
- 14:01:42get distracted. You will get
- 14:01:44sidetracked. So, um tips there on on
- 14:01:47being a good leader. In addition to
- 14:01:50that, um ask questions. You know, don't
- 14:01:54be afraid if you don't understand
- 14:01:56something or if you want to hear more
- 14:01:57about something, use use the phrase tell
- 14:02:00me more. Um tell me more is also
- 14:02:02especially effective in calming a
- 14:02:04situation down. If you feel like things
- 14:02:07are starting to get hot and percolate a
- 14:02:09little bit, start asking, "Tell me more
- 14:02:11about this. Tell me more about that.
- 14:02:13tell me what happened when X Y and Z
- 14:02:16happened. So ask questions, make
- 14:02:19yourself available. Um listen, don't
- 14:02:22multitask. I think those are all great
- 14:02:24characteristics and great things that
- 14:02:26leaders have.
- 14:02:29[Music]
- 14:02:39Hello everyone. We welcome you to a
- 14:02:41brief demo on leadership. Effective
- 14:02:45leadership is critical to project
- 14:02:46success. We challenge you to go ahead
- 14:02:49and complete the survey below to
- 14:02:51determine your leadership strengths and
- 14:02:53weaknesses. When you're complete, select
- 14:02:56two areas you can commit to improving
- 14:02:58over the next six days. This particular
- 14:03:01leadership survey has 10 questions. We
- 14:03:05will ask you to go ahead and score each
- 14:03:07question on a 1 through five scale. If
- 14:03:11you believe that you always and
- 14:03:13consistently do something in the
- 14:03:16question, give it a five. If you usually
- 14:03:18do something, it's a four. If it's half
- 14:03:21and half, 50/50, score it a three. If it
- 14:03:25is a two, score it occasionally. And a
- 14:03:28one for rarely. Again, score each
- 14:03:32statement as honestly as possible. So,
- 14:03:35let's go ahead and take a look at these
- 14:03:3710 questions, which is a really great
- 14:03:40overview of the essentials of
- 14:03:42leadership. Question number one
- 14:03:45discusses vision. A solid leader creates
- 14:03:48a vision. They share where the ASIS and
- 14:03:502B states are currently. And every
- 14:03:54leader knows that a good vision
- 14:03:56motivates. On this particular example,
- 14:03:59the individual scored a four. They
- 14:04:01believe that they usually create and
- 14:04:04share a vision. Question number two
- 14:04:07discusses motivation. The leader needs
- 14:04:10to maintain motivation and commitment.
- 14:04:12Without motivation, production may
- 14:04:14suffer and the project may fail. This
- 14:04:17individual scored themselves a four.
- 14:04:20Question number three talks about biases
- 14:04:24and we all have biases. Bias occurs when
- 14:04:27you are not objective or show
- 14:04:28favoritism. And a good leader strives to
- 14:04:31control this bias. This individual was
- 14:04:34very honest and scored themselves a two,
- 14:04:37which means they occasionally recognize
- 14:04:39and control their personal biases, but
- 14:04:42there is some room for improvement.
- 14:04:44Question number four discusses emotional
- 14:04:47intelligence. Emotional intelligence
- 14:04:49allows you to be self-aware,
- 14:04:52self-manage, be more socially aware, and
- 14:04:55improve relationships. This is a
- 14:04:57leadership must. This individual gave
- 14:05:00themselves a score of three, 50/50.
- 14:05:03Question number five discusses decision
- 14:05:06making, another key leadership
- 14:05:09responsibility.
- 14:05:10A leader must make decisions. However,
- 14:05:13an inclusive and collaborative approach
- 14:05:15generally yields the best results. This
- 14:05:18individual scored a three.
- 14:05:22Question number six talks about
- 14:05:23tailoring leadership styles. You must
- 14:05:26tailor or adapt your leadership styles
- 14:05:28to the individual to be effective. Do
- 14:05:30not use a singular one-sizefitsall
- 14:05:33approach. Every one is different. This
- 14:05:37individual for question number six gave
- 14:05:40themselves a two. Room for improvement.
- 14:05:44Question number seven talks about
- 14:05:45blockers or impediments. Blockers can
- 14:05:48halt production and bring the project to
- 14:05:50a standstill. Simply speaking, identify
- 14:05:53them before they identify you. This
- 14:05:56individual felt that they did quite well
- 14:05:58in this area. They scored a four.
- 14:06:01Question number eight talks about
- 14:06:03distractions. A good leader shields the
- 14:06:06team from distractions that can
- 14:06:08interfere with the work in progress.
- 14:06:10This individual scored themselves a
- 14:06:13three. Question number nine talks about
- 14:06:16encouragement. As a leader, be a
- 14:06:19cheerleader. Encourage the team by
- 14:06:20providing rewards, tools, and support.
- 14:06:24This individual felt they were very
- 14:06:25strong in this area and scored
- 14:06:27themselves a five. The final question
- 14:06:30was regarding the management of
- 14:06:32conflict. Remember that conflict can be
- 14:06:35functional or dysfunctional. Recognize
- 14:06:38conflict and address it as soon as
- 14:06:40possible to achieve the benefits of
- 14:06:42functional conflict and avoid the perils
- 14:06:45of the dysfunctional conflict. This
- 14:06:47individual scored themselves a four. At
- 14:06:50the end of the survey, the individual
- 14:06:52scored up all of their areas. For each
- 14:06:56five, they gave themselves a five. For
- 14:06:58each four, they gave themselves a four.
- 14:07:00Their total score was 34.
- 14:07:03Now, where do they stand as a leader?
- 14:07:06Well, in this particular case, this
- 14:07:08individual is a fair leader. It says you
- 14:07:11apply proven leadership techniques in
- 14:07:14both cases. There is room for
- 14:07:15improvement. Choose your two most
- 14:07:17challenging areas and develop an action
- 14:07:20plan to approve. However, even if you
- 14:07:23score 40 to 50 and you are an
- 14:07:26exceptional leader, there is always room
- 14:07:28for improvement. And if you score very
- 14:07:31low 10 to 24, it means your leadership
- 14:07:34abilities do require improvement.
- 14:07:37However, find a positive mentor or coach
- 14:07:40to follow. Participate in leadership
- 14:07:42training, set a goal, and improve your
- 14:07:44skills one step at a time. There is a
- 14:07:48term called don't try to boil the ocean.
- 14:07:51What that means is don't try to do
- 14:07:53everything at once. The recommendation
- 14:07:55to become a better leader is to look for
- 14:07:58two areas of improvement. In our
- 14:08:01example, the two lowest scoring areas
- 14:08:03were control of personal bias and
- 14:08:06tailoring of leadership. Develop a
- 14:08:09personal action plan. Work with your
- 14:08:11peers, work with others, validate that
- 14:08:14plan, and do your best to improve. Even
- 14:08:17if you can only increase your score from
- 14:08:19a two to a three, that is an
- 14:08:21improvement. and you're following a
- 14:08:24journey to where you can take your
- 14:08:26leadership from good to great. That
- 14:08:29concludes this overview. You will have
- 14:08:31an opportunity to complete this survey
- 14:08:33on your own. We hope that you enjoy the
- 14:08:36survey and we hope that you have an
- 14:08:38opportunity to identify a few key areas
- 14:08:42where you may improve your leadership
- 14:08:44skills. Have a great rest of your day
- 14:08:46and we look forward to seeing you again
- 14:08:48in future demo videos.
- 14:08:53[Music]
- 14:09:01Welcome to impact of a good leader on
- 14:09:03team dynamics and productivity. After
- 14:09:05watching this video, you'll be able to
- 14:09:07summarize the Tuckman ladder and define
- 14:09:09how being a good project leader impacts
- 14:09:11a project team. The dynamics of a
- 14:09:13project team vary over the project life
- 14:09:15cycle. For example, when team members
- 14:09:17meet for the first time, the trust
- 14:09:18levels may be minimal. Trust may grow as
- 14:09:21the project progresses. Conflicts may
- 14:09:23arise due to differences of opinion as
- 14:09:25the team starts working together. All
- 14:09:27these can impact overall productivity. A
- 14:09:29project manager must recognize, prepare,
- 14:09:31and manage the dynamics of a team
- 14:09:33throughout the project life cycle.
- 14:09:35Ultimately geared towards creating a
- 14:09:36high productivity team. The Tuckman
- 14:09:39ladder developed by Bruce Tuckman in
- 14:09:401965 is a model for project team
- 14:09:43development throughout the project life
- 14:09:45cycle. The Tuckman ladder guides the
- 14:09:47project manager and prescribes
- 14:09:48leadership strategies to achieve maximum
- 14:09:50team productivity. The Tuckman ladder
- 14:09:52shares four stages of team development,
- 14:09:54including form, storm, norm, and
- 14:09:57perform. At each stage, the Tuckman
- 14:09:59model prescribes distinct leadership
- 14:10:01strategies. Let's look at each stage in
- 14:10:03practical leadership strategies in
- 14:10:05detail. Consider this scenario. At the
- 14:10:07start of a new project, individuals from
- 14:10:09different departments come together to
- 14:10:10work on the project. Being a new
- 14:10:12project, some individuals are excited,
- 14:10:14some are confused, and others are
- 14:10:16curious. This is the form stage of the
- 14:10:19Tuckman ladder, where the team needs
- 14:10:21general information on the project, such
- 14:10:22as purpose, value to the organization,
- 14:10:24themselves, and who's involved. The
- 14:10:26project manager should be a leader who
- 14:10:28directs and tells the team what they
- 14:10:30need to know. For example, the project
- 14:10:32manager must set clear goals and
- 14:10:34objectives, address questions and
- 14:10:35issues, and orient the team to the
- 14:10:37project. Remember, failure to tell leads
- 14:10:40to confusion, lack of commitment,
- 14:10:41questions, and blockers. The storm stage
- 14:10:44is when individuals start working on the
- 14:10:46project on their tasks. For example,
- 14:10:48after the project manager provides
- 14:10:49project details to the team, each
- 14:10:52individual starts working on project
- 14:10:53tasks. Different working styles can lead
- 14:10:56to conflicts and questioning each
- 14:10:57other's capabilities and working styles.
- 14:10:59There may even be some resilience to
- 14:11:01starting any work. This is an essential
- 14:11:03stage as many teams fail beyond
- 14:11:05recovery. In the storm stage, the
- 14:11:07project manager must be a leader who can
- 14:11:08sell the project value to a team member
- 14:11:10and spell out the value the team member
- 14:11:12brings. The project manager must address
- 14:11:14reservations, provide assurances and
- 14:11:16answer questions. Most importantly, the
- 14:11:18project manager must look for
- 14:11:20opportunities to build relationships
- 14:11:21with team members. A failure to sell
- 14:11:24will leave the team member in a state
- 14:11:25where they are not productive and unable
- 14:11:27to focus on the project's work. Next
- 14:11:29comes the norm stage where the team has
- 14:11:32overcome the storm. and they are
- 14:11:33beginning to work together and their
- 14:11:34focus shifts from self to the project.
- 14:11:36For example, individuals gradually start
- 14:11:39resolving their differences,
- 14:11:40appreciating each other's strengths and
- 14:11:41skills and working as a team. In the
- 14:11:44norm stage, the project manager must be
- 14:11:46a leader who participates. The project
- 14:11:48manager must encourage team members to
- 14:11:50take responsibility for the project's
- 14:11:52progress. The project manager must also
- 14:11:54promote collaboration and effective
- 14:11:56interpersonal communication. A failure
- 14:11:58to participate can lead to the team
- 14:12:00rolling back to the storm stage.
- 14:12:02Throughout this time, the team is
- 14:12:03motivated and starts working towards a
- 14:12:05common goal. For example, if a team
- 14:12:07member is on leave, another team member
- 14:12:09picks up the work and takes it to
- 14:12:10closure. This is the perform stage of
- 14:12:12the Tuckman ladder where the team shows
- 14:12:14commitment and motivation and requires
- 14:12:16minimal support. In the perform stage,
- 14:12:19the project manager must be a leader who
- 14:12:21delegates. The project manager must
- 14:12:23delegate tasks to team members and let
- 14:12:25the team take responsibility. The
- 14:12:27project manager should focus on status
- 14:12:29updates and check-ins regularly. A
- 14:12:31failure to delegate displays a lack of
- 14:12:33trust and confidence in the team.
- 14:12:35Micromanagement and team demotivation go
- 14:12:37together. In this video, you learned
- 14:12:39that the Tuckman ladder is a team
- 14:12:41building model. There are four stages of
- 14:12:43the Tuckman ladder. Form stage, where a
- 14:12:45project manager must be a leader who
- 14:12:47directs. Storm stage, where a project
- 14:12:49manager must be a leader who sells
- 14:12:51project value. Norm stage, where a
- 14:12:53project manager must be a leader who
- 14:12:55participates. Perform stage, where a
- 14:12:57project manager must be a leader who
- 14:12:59delegates.
- 14:13:02[Music]
- 14:13:10Welcome to leadership factors and
- 14:13:12styles. After watching this video,
- 14:13:14you'll be able to compare manager and
- 14:13:16leader, identify the different types of
- 14:13:18leadership styles, list the factors that
- 14:13:20impact a leader style, and describe the
- 14:13:22Hershey Blanchard situational leadership
- 14:13:24model. Manager and leader as terms are
- 14:13:27used interchangeably. However, while
- 14:13:29managers and leaders share common
- 14:13:31attributes, there are several
- 14:13:32differences. Project Management
- 14:13:34Institute or PMI lists 11 distinctions
- 14:13:37between managers and leaders. Let's look
- 14:13:38at these. A manager uses their position
- 14:13:41to direct the work. A leader guides,
- 14:13:43influences, and collaborates using
- 14:13:44relational power. A manager maintains
- 14:13:47the current state. A leader develops a
- 14:13:49new and improved state. A manager is an
- 14:13:51administrator. A leader is an innovator.
- 14:13:54Managers focus on systems and
- 14:13:55structures. Leaders focus on
- 14:13:57relationships with people. Managers rely
- 14:14:00on control. Leaders inspire trust. A
- 14:14:03manager focuses on achieving short-term
- 14:14:05goals. A leader focuses on a long range
- 14:14:07vision. The manager asks how and when.
- 14:14:09The leader asks what and why. Managers
- 14:14:12focus on the bottom line. Leaders focus
- 14:14:14on the horizon. Managers accept the
- 14:14:16status quo. Leaders challenge the status
- 14:14:19quo. Managers do things right. Leaders
- 14:14:21do the right things. Managers focus on
- 14:14:24operational issues and problem solving.
- 14:14:26Leaders focus on vision, alignment,
- 14:14:28motivation, and inspiration. A project
- 14:14:31manager needs to strive to be both a
- 14:14:32manager and a leader. Let's now move the
- 14:14:35focus to leadership styles and look at
- 14:14:36some distinct styles. Lazy fair or
- 14:14:39hands-off style is where a leader allows
- 14:14:41the team members to work independently
- 14:14:42and make decisions on their own.
- 14:14:44Transactional is a leadership style
- 14:14:46focused on accomplishments such as
- 14:14:47completing tasks, providing feedback,
- 14:14:49meeting goals and objectives, and
- 14:14:51determining the rewards based on
- 14:14:53accomplishments. Another leadership
- 14:14:55style is servant leadership. A servant
- 14:14:57leader focuses on serving the people and
- 14:14:58always puts their people first.
- 14:15:00Transformational leadership style
- 14:15:02focuses on empowering, inspiring, and
- 14:15:04encouraging innovation. Charismatic
- 14:15:06leadership is a style where leaders are
- 14:15:08high energy, enthusiastic,
- 14:15:09inspirational, and have a strong
- 14:15:11conviction. Interactional leadership
- 14:15:13style is a combination of transactional,
- 14:15:15transformational, and charismatic
- 14:15:17leadership styles. A project manager may
- 14:15:19have one of the above leadership styles
- 14:15:21to be dominant. However, they will need
- 14:15:23to mix or swap styles based on different
- 14:15:25situations. One approach to select the
- 14:15:27best leadership style is influenced by
- 14:15:29the four factors. Project manager
- 14:15:32characteristics, which include their
- 14:15:33attitude, moods, needs, values, and
- 14:15:35ethics. Team members characteristics are
- 14:15:37their attitudes, moods, needs, values,
- 14:15:39and ethics. Organizational
- 14:15:41characteristics which includes the
- 14:15:42purpose and structure of the
- 14:15:44organization. The nature of work also
- 14:15:46influences the leadership style.
- 14:15:48Environmental characteristics such as
- 14:15:50the current social situation, economic
- 14:15:52state, and even internal and external
- 14:15:54political elements can influence
- 14:15:55leadership style. Another approach to
- 14:15:57selecting a leadership style is the
- 14:15:58Hershey Blanchard situational leadership
- 14:16:00model. The model defines four specific
- 14:16:03performance readiness levels for each
- 14:16:04team member or stakeholder. The model
- 14:16:07suggests that project managers adapt
- 14:16:08their leadership styles to tasks and
- 14:16:10relationships in the workplace that map
- 14:16:12to the individuals or team members
- 14:16:14readiness level. Readiness level four is
- 14:16:16the highest state of readiness. The team
- 14:16:18member is highly skilled and capable of
- 14:16:20performing at a high level. They also
- 14:16:22have the confidence to do what is
- 14:16:23required and are self-directed to take
- 14:16:25the initiative without being directed.
- 14:16:27At this level, the optimal strategy is
- 14:16:29to delegate. Readiness level three is
- 14:16:31similar to readiness level four with one
- 14:16:33big exception. The team member has the
- 14:16:35necessary skills to perform at a high
- 14:16:37level. They also require minimal
- 14:16:39direction. The exception is confidence.
- 14:16:41Something is preventing this team member
- 14:16:43from taking the initiative to perform.
- 14:16:45We classify readiness level three as a
- 14:16:47state of moderate readiness. At this
- 14:16:49level, the optimal strategy is to
- 14:16:51participate. Readiness level two is a
- 14:16:53state where the team member has the
- 14:16:54confidence and motivation to perform.
- 14:16:56They are anxious to move forward. The
- 14:16:58problem is that they lack the skills to
- 14:17:00be successful. We also classify
- 14:17:02readiness level two as a state of
- 14:17:04moderate readiness. These team members
- 14:17:06must be leaderdirected. At this level,
- 14:17:07the optimal strategy is to sell.
- 14:17:09Readiness level one is the lowest state
- 14:17:11of readiness. The team member lacks the
- 14:17:13skills necessary to perform. In
- 14:17:15addition, they lack the confidence
- 14:17:16needed to be self-directed. These team
- 14:17:19members must be leaderdirected. At this
- 14:17:21level, the optimal strategy is to tell.
- 14:17:23The table summarizes the association
- 14:17:25between leadership styles and readiness
- 14:17:27levels. In this video, you learned that
- 14:17:29management and leadership do intersect
- 14:17:31and have shared attributes. There are 11
- 14:17:34distinctions between a manager and a
- 14:17:35leader as defined by PMI. Some
- 14:17:38leadership styles include lazair,
- 14:17:40transactional, transformational, servant
- 14:17:42leadership, charismatic, and
- 14:17:43interactional. There are four main
- 14:17:45characteristics to consider when
- 14:17:47choosing a leadership style, including
- 14:17:49leader characteristics, team
- 14:17:50characteristics, organizational
- 14:17:52characteristics, and environmental
- 14:17:54characteristics. The Hershey Blanchard
- 14:17:56situational leadership model defines
- 14:17:57four specific performance readiness
- 14:17:59levels for each team member or
- 14:18:01stakeholder.
- 14:18:04[Music]
- 14:18:11Welcome to expert viewpoints leadership
- 14:18:13competencies skills and mindset.
- 14:18:16What are some leadership challenges you
- 14:18:18encountered and how did you overcome
- 14:18:19them?
- 14:18:22I've encountered a lot of leadership
- 14:18:23challenges over the years. Um, having
- 14:18:25been a leader and then obviously having
- 14:18:27been led by many leaders, I've got to
- 14:18:29see it from both sides of the coin. Um,
- 14:18:31delivering, you know, leadership skills
- 14:18:33to other people and then being the
- 14:18:34recipient of other people's leadership
- 14:18:37uh, abilities and skills. Um, so I've
- 14:18:39had many many challenges. I think if I
- 14:18:41were to kind of call out one of the
- 14:18:43biggest challenges that I've um had to
- 14:18:46face as a leader and then overcome is um
- 14:18:50the ability to be honest with bad news.
- 14:18:54Um early on in my career, I hated
- 14:18:57delivering bad news. Absolutely hated
- 14:18:59it. Um whether it be performance
- 14:19:01challenges or telling upper management
- 14:19:04that a project was going to be late. Um
- 14:19:06it it didn't matter. I just hated
- 14:19:08delivering bad news. I I don't think
- 14:19:09most people like delivering bad news. Um
- 14:19:12but in leadership in in project
- 14:19:14management, it's always something that
- 14:19:16you have to do. Um there things rarely
- 14:19:20go perfectly and there's always some bad
- 14:19:22news that you have to deliver. So
- 14:19:23earlier on in my career, I would find
- 14:19:26ways either to avoid delivering the bad
- 14:19:28news. I would try to solve certain
- 14:19:30problems myself so they didn't have to
- 14:19:32deliver the bad news. Um, or I would try
- 14:19:35to couch the bad news in vocabulary that
- 14:19:39made it didn't make it sound as bad as
- 14:19:41it was. Um, so one big mistake I made a
- 14:19:45lot in my career is that I wasn't clear
- 14:19:48on what I wanted my team to do or what I
- 14:19:50wanted a specific team member to do or I
- 14:19:53wasn't clear to upper management on how
- 14:19:55bad things were because I was trying to
- 14:19:58um I was trying to minimize the impact
- 14:20:01of my bad news that I was delivering.
- 14:20:04And I can say, obviously recollection
- 14:20:06isn't always perfect, but I can say with
- 14:20:08a lot of confidence that in almost every
- 14:20:10situation where I did that, I ended up
- 14:20:13regretting it. Um, here's an example.
- 14:20:16When I was, you know, managing teams
- 14:20:18early in my career, there was always
- 14:20:20people on the team that needed to have
- 14:20:22their performance improved. They needed
- 14:20:23to do a better job than they were doing.
- 14:20:25and we would give year- end and mid-year
- 14:20:27reviews and I would have to tell them,
- 14:20:29you know, you're you're not performing
- 14:20:30at the level you need to perform to get
- 14:20:32a good bonus or whatever. And I would
- 14:20:36not want to deliver that message because
- 14:20:38people never wanted to hear that they
- 14:20:39weren't performing well. And so I would
- 14:20:42try to I would couch it. I would focus
- 14:20:44on the things they were doing well. And
- 14:20:46then I would say, "Well, here's a couple
- 14:20:47of things you should probably work on."
- 14:20:49But I was never really super clear on,
- 14:20:52you know, you're not performing and
- 14:20:54these are the things that you need to
- 14:20:55get better at uh in order to get up to
- 14:20:57that top performer level. And then uh 6
- 14:21:01months later or a year later, whenever
- 14:21:03their next review was, they didn't
- 14:21:05really
- 14:21:07So at their next performance review,
- 14:21:09they didn't really respond to the
- 14:21:11feedback I gave them because I wasn't
- 14:21:12clear in my feedback and their situation
- 14:21:15would be worse. And then I'd have to
- 14:21:17deliver even more bad news, but I didn't
- 14:21:20want to deliver the worst news the the 6
- 14:21:23months or a year later. And so that
- 14:21:25problem would continue to exacerbate
- 14:21:27until it came up. It came to a a really
- 14:21:30big problem that my manager would have
- 14:21:32to step in and deliver the bad news. So
- 14:21:35I had to learn uh to be an effective
- 14:21:38leader. It's better to deliver hard news
- 14:21:41and sometimes bad news very very
- 14:21:43honestly and very clearly upfront rather
- 14:21:46than letting it you know just grow
- 14:21:48bigger and bigger until uh a project
- 14:21:50blows up. Now, obviously, there's ways
- 14:21:53to deliver bad news or tough news in a
- 14:21:57way that doesn't demoralize the people
- 14:21:58that you're delivering it to or that
- 14:22:01doesn't, you know, that reduces
- 14:22:03confidence in leadership if you have to
- 14:22:05deliver bad news to leadership. But I
- 14:22:07found that being extremely clear and not
- 14:22:11soft soaping your bad messages and then
- 14:22:14always trying to provide a mitigation.
- 14:22:16So if you um have to deliver a bad
- 14:22:18message to one of your uh the people on
- 14:22:20your team, you can say here's what's
- 14:22:23happening. Here's what it means if you
- 14:22:25don't improve, but now let's talk about
- 14:22:27ways that we can turn this around. Or if
- 14:22:30you have a project that is behind
- 14:22:32schedule, you can say, you know, you can
- 14:22:34say to your team, the the project is
- 14:22:36behind schedule, things aren't going
- 14:22:38well. here's the impact if we don't turn
- 14:22:40this around and here are some ideas that
- 14:22:43I'm going to bring to the table to help
- 14:22:44us get this back on track. So, it's not
- 14:22:47just delivering bad news and kind of
- 14:22:49letting the team flounder. It's
- 14:22:51providing a path forward so that that
- 14:22:54can be improved and then the team has a
- 14:22:56very good sense of uh what they need to
- 14:22:58do or the individual that you're talking
- 14:23:00to has a good sense of what they need to
- 14:23:01do in order to get the project or their
- 14:23:03career or whatever it is uh back on
- 14:23:06track. So I think those those uh two
- 14:23:08components go together
- 14:23:10>> for a large number of years I have been
- 14:23:13a remote worker and so I even when
- 14:23:16people were in the office before co I
- 14:23:19was not there you know people would have
- 14:23:21project team members would have hallway
- 14:23:22conversations they would discuss
- 14:23:24something maybe they would decide
- 14:23:26something maybe they would take a
- 14:23:27project a different way and I'm not
- 14:23:29there to be part of that conversation
- 14:23:32not every conversation can be had in a
- 14:23:35meeting with a remote person as part of
- 14:23:37that meeting or be documented as notes
- 14:23:40and sent out later. Um, you're not going
- 14:23:43to get people who run into each other in
- 14:23:45your little kitchen area at work getting
- 14:23:46a cup of coffee having a conversation.
- 14:23:48They're not going to go back to their
- 14:23:50desk and ping you and say, "Hey, I just
- 14:23:52talked to this person and here's what we
- 14:23:54talked about and I thought you should
- 14:23:55know." So what I've done, what I did to
- 14:23:58overcome that, what I still do is I just
- 14:24:00have frequent touch points almost like a
- 14:24:02sprint in order to stay informed. And so
- 14:24:06maybe it's a 15minute connect at the end
- 14:24:08of the day or or noon or whatever. Maybe
- 14:24:11it's a coffee chat in the morning, but I
- 14:24:13just touch base with key people that I
- 14:24:15have a really good relationship with and
- 14:24:17say, "Hey, what's going on? Who have you
- 14:24:19talked to lately? um anything I need to
- 14:24:22know about that you're hearing around
- 14:24:23the office or wherever they are, you
- 14:24:26know, and around I think of around the
- 14:24:28office as in air quotes. Um that has
- 14:24:31really been one of the the critical
- 14:24:33things that I've done to um to work past
- 14:24:38being a remote leader to where I can't
- 14:24:41be there. The other issue or the other
- 14:24:44uh leadership challenge that I have
- 14:24:46faced in the last few years is having a
- 14:24:48global team and my team I'm in uh Fargo,
- 14:24:52North Dakota and my team is in India. I
- 14:24:55cannot be feet on the ground for them. I
- 14:24:58can't be there to react in the moment to
- 14:25:00provide decisional direction on hot
- 14:25:03items. And so again, frequent
- 14:25:06connections, frequent conversations, and
- 14:25:08then also um different chat apps,
- 14:25:11WhatsApp on my cell phone if they need
- 14:25:14to get a hold of me or texts or
- 14:25:15something like that, um are really
- 14:25:18critical. And and then surrounding
- 14:25:20myself with people that I trust. That's
- 14:25:23really a big one. And there's probably
- 14:25:24different quotes of people saying that.
- 14:25:26I think presidents have said that US
- 14:25:28presidents but you know where I can't be
- 14:25:30feet on the ground where I can't be
- 14:25:32available for crucial in the- moment
- 14:25:35conversations I need to trust the person
- 14:25:38who is having that conversation and I do
- 14:25:41and my team in in India is an excellent
- 14:25:44team and they run a really tight chip
- 14:25:46and so finding those trusted people that
- 14:25:50you can have on your team that keep you
- 14:25:52informed that engage you when you need
- 14:25:53to be engaged is super critical.
- 14:25:56I'm a firm believer in the emotional
- 14:25:58intelligence model.
- 14:26:01Unfortunately, I often encounter many
- 14:26:03stakeholders who have severe
- 14:26:05self-awareness issues. They have no idea
- 14:26:09how their actions impact the team. In
- 14:26:11addition, they have limited control over
- 14:26:13how the team affects them.
- 14:26:16I often share the top five
- 14:26:18self-awareness challenges and ask team
- 14:26:21members to honestly evaluate themselves.
- 14:26:24If they are lacking, I give them a
- 14:26:26challenge to address the challenge they
- 14:26:29see as the biggest one impacting them.
- 14:26:32So, let me go ahead and include the top
- 14:26:34five areas of self-awareness challenges
- 14:26:38you may encounter. Challenge number one,
- 14:26:41do you accurately perceive your own
- 14:26:43emotions in the moment? and understand
- 14:26:46your tendencies across situations.
- 14:26:50Do you know how you're going to react?
- 14:26:52Number two, are you willing to tolerate
- 14:26:54the discomfort of focusing on feelings
- 14:26:57that are negative? Unfortunately, in
- 14:27:00project management, not everything is
- 14:27:02positive and sometimes you have to have
- 14:27:04the difficult discussions. Number three
- 14:27:07is my favorite. Do you have a
- 14:27:08straightforward and honest understanding
- 14:27:11of why you do the things that you do? Do
- 14:27:14you know how people push your buttons?
- 14:27:16And do you know how you're going to
- 14:27:18react? Number four, do you have a clear
- 14:27:20understanding of what you do well? What
- 14:27:23motivates and satisfies you? And again,
- 14:27:27which people or situations can lead you
- 14:27:30into actions that perhaps you may not be
- 14:27:33happy with in retrospect.
- 14:27:36Finally, are you afraid of your
- 14:27:38emotional mistakes or can you recognize
- 14:27:42the beauty and the blemishes of who you
- 14:27:44are? I'm going to take this as the
- 14:27:47approach of other managers that I've
- 14:27:50worked with and my own leadership as far
- 14:27:53as things that we've had encountered.
- 14:27:55So, for example, the first one is lack
- 14:27:58of communication. When you don't
- 14:28:00understand exactly how they like to
- 14:28:02communicate and they don't look to see
- 14:28:05how you would like to communicate,
- 14:28:07there's that barrier. With open
- 14:28:09communication, you also understand more
- 14:28:12of the expectations that they're looking
- 14:28:13for. When you have no expectations, it
- 14:28:16can be a very stressful environment for
- 14:28:19both sides because you're not getting
- 14:28:20the information you need from your
- 14:28:22manager and the manager doesn't know
- 14:28:24what's going on either. So really having
- 14:28:26that open communication, setting
- 14:28:28expectations makes a huge difference.
- 14:28:34[Music]
- 14:28:42Welcome to situational leadership with
- 14:28:44your team. After watching this video,
- 14:28:46you'll be able to summarize key
- 14:28:47leadership tailoring considerations,
- 14:28:50explain the Oscar coaching and mentoring
- 14:28:51model. There are different types of
- 14:28:54leadership styles including tell, sell,
- 14:28:56participate, and delegate. Another video
- 14:28:58explains the leadership styles in
- 14:28:59detail. The project manager cannot rely
- 14:29:02on one or the other and must be able to
- 14:29:03determine the most appropriate
- 14:29:05leadership style based on the situation.
- 14:29:08For example, a project manager has to
- 14:29:09manage the completion of a project. The
- 14:29:11team has been working together for a
- 14:29:13long time and understands the project
- 14:29:14processes and deliverables. The project
- 14:29:17manager has full confidence in them.
- 14:29:19Therefore, they can use the delegate
- 14:29:20leadership style with the team. A
- 14:29:22project manager must understand how to
- 14:29:24tailor the leadership style in different
- 14:29:26scenarios. To help the project manager
- 14:29:28with tailoring or adapting the
- 14:29:29leadership styles, the project
- 14:29:31management institute or PMI provides
- 14:29:33four key variables. Let's dive into the
- 14:29:35variables. One variable to consider is
- 14:29:38the team member's expertise. A project
- 14:29:40manager must determine the level of
- 14:29:41expertise each team member possesses.
- 14:29:43The project manager must also determine
- 14:29:45how well a team member skill set matches
- 14:29:47the project's requirements. A good
- 14:29:49understanding of the skill levels and
- 14:29:51capability to perform the required tasks
- 14:29:53in a project is crucial to select the
- 14:29:55proper leadership style. For example,
- 14:29:57consider a team member with minimal
- 14:29:59skills and low confidence. In this case,
- 14:30:01a project manager needs to provide
- 14:30:03direction. Hence, the project manager
- 14:30:05will use the direct leadership style. An
- 14:30:07example of selling is encouraging the
- 14:30:09team member to apply new skills learned
- 14:30:10in a training session. Another variable
- 14:30:13to consider is the maturity of team
- 14:30:15members. While a team member may have
- 14:30:16the expertise in a certain skill,
- 14:30:18experience in working in the area of
- 14:30:20expertise can bring other advanced
- 14:30:22skills such as problem solving,
- 14:30:23adaptability, and resilience. The third
- 14:30:26variable to consider when selecting the
- 14:30:27appropriate leadership style in a given
- 14:30:29situation is governance. The level of
- 14:30:31governance drives the levels of
- 14:30:33empowerment and delegation that a
- 14:30:34project manager can give the team. For
- 14:30:36example, on a highly data-sensitive
- 14:30:38project, the project manager may need to
- 14:30:40direct all team members to work from an
- 14:30:42on-site location rather than a remote
- 14:30:44location. The project manager might even
- 14:30:46need to use the cell leadership style to
- 14:30:48help team members understand the
- 14:30:50importance of the project for the
- 14:30:52organization while highlighting the
- 14:30:53skill additions for the team members.
- 14:30:55The fourth variable to be considered
- 14:30:57when selecting the leadership style is
- 14:30:59the nature of the team setup,
- 14:31:00colllocated or distributed. For example,
- 14:31:03consider a team of experienced
- 14:31:04individuals that works in from the same
- 14:31:06location. It's likely to be easy for a
- 14:31:08project manager to assess the team's
- 14:31:10maturity and delegate work as necessary.
- 14:31:12At the same time, in a newly setup
- 14:31:14distributed environment, irrespective of
- 14:31:16the levels of expertise in the team, the
- 14:31:18project may need to use direct
- 14:31:20leadership style until the team settles.
- 14:31:22With an understanding of the variables
- 14:31:24and leadership styles, a project manager
- 14:31:25can use the Oscar coaching and mentoring
- 14:31:27model developed by Karen Witworth and
- 14:31:30Andrew Gilbert. The Oscar model is a
- 14:31:32five-step process to help leaders better
- 14:31:34adapt their styles and approaches by
- 14:31:35providing an action plan for personal
- 14:31:37development. The Oscar model refers to
- 14:31:39five contributing factors. The outcome
- 14:31:42can be summarized as the expectations
- 14:31:44you have for the individual in the long
- 14:31:45run. What is the expected result from
- 14:31:47the conversation? The situation is in
- 14:31:49essence a gap analysis. Where is the
- 14:31:51individual in terms of skills,
- 14:31:53abilities, and knowledge and where do
- 14:31:54they need to be? choices and
- 14:31:56consequences objectively analyze the
- 14:31:58gaps and determine the best ways to
- 14:32:00improve the individual's performance and
- 14:32:01outcomes. The action is a well planned
- 14:32:04step-by-step approach to reach the level
- 14:32:06of success required of the individual.
- 14:32:08Finally, reviews at each step along the
- 14:32:10way are essential to provide feedback
- 14:32:12and ensure the individual stays on
- 14:32:14track. Let's review an example of using
- 14:32:16the Oscar model. Consider a scenario. A
- 14:32:18new developer has been assigned to the
- 14:32:20project team. One, the project manager
- 14:32:22defines the outcomes. The outcome is
- 14:32:24that the new team member must integrate
- 14:32:26into the team and be self-directed by
- 14:32:28the next iteration. Next, the project
- 14:32:30manager defines the situation and
- 14:32:32performs a gap analysis. The situation
- 14:32:34with gap analysis is the new team member
- 14:32:36is deficient in three key skills and
- 14:32:38must attend a training class. The
- 14:32:40consequence is explained in terms of
- 14:32:41choices. In this example, the new team
- 14:32:43member must score at least an 80% on the
- 14:32:46final training course exam and be
- 14:32:48evaluated by a senior team member for
- 14:32:50competence. The action plan is developed
- 14:32:52and the new team member signs off. In
- 14:32:54the end, the team member's progress is
- 14:32:56reviewed and ready for being
- 14:32:57self-directed.
- 14:32:59In this video, you learned that the
- 14:33:00project management institute or PMI has
- 14:33:03four key variables when determining the
- 14:33:04most appropriate leadership style:
- 14:33:06experience, maturity, governance, and
- 14:33:08distributed teams. Developed by Karen
- 14:33:10Witworth and Andrew Gilbert, the Oscar
- 14:33:12model is a five-step process to help
- 14:33:14leaders better adapt their styles and
- 14:33:16approaches by providing an action plan
- 14:33:18for personal development.
- 14:33:22[Music]
- 14:33:31Welcome to expert viewpoints using your
- 14:33:33intuition. In this video, we'll hear
- 14:33:35leaders and experts discuss the
- 14:33:36importance of using your intuition to
- 14:33:38make decisions and share their real
- 14:33:40world experiences.
- 14:33:43When a project goes off course, there
- 14:33:45are tiny little hints that many people
- 14:33:47might not notice, but a good project
- 14:33:50manager will pick up on it right away.
- 14:33:52Maybe it's silence on a call. Maybe it's
- 14:33:55a client's communication style that has
- 14:33:58shifted and their sentences are a little
- 14:33:59bit shorter with a small hint of
- 14:34:01negativity.
- 14:34:02It's important to not shy away from this
- 14:34:04and start checking in with your
- 14:34:06teammates and clients one on-one. Say,
- 14:34:08"Hey, how how are you feeling about this
- 14:34:10project? I've noticed this. This will
- 14:34:12help you get to the root of the problem
- 14:34:14faster and change course.
- 14:34:17>> Intuition for me is the ability to use
- 14:34:19your background knowledge, your natural
- 14:34:22skills, as well as all the training and
- 14:34:24experience that you've gained to bring
- 14:34:27that to the table to um help make
- 14:34:30decisions. So, for example, if you're
- 14:34:34presented with a problem, let's say that
- 14:34:36a stakeholder has just told you that
- 14:34:39they thought they were going to have
- 14:34:40time to work on your project, but now
- 14:34:42they have to pull out because the
- 14:34:45previous project that they were working
- 14:34:47on is running over. Now, without
- 14:34:49intuition, you may not have any sense of
- 14:34:52what that what that's going to mean. Um,
- 14:34:55and uh if you're a junior project
- 14:34:57manager, that may seem like the world's
- 14:35:00going to end, right? this is now uh no
- 14:35:03longer uh something I can handle. Uh we
- 14:35:05have a major stakeholder that can't do
- 14:35:07their work and so we need to push out
- 14:35:09the timelines and all the rest of it,
- 14:35:10right? Um you're if you have some
- 14:35:13intuitions around that, you may say,
- 14:35:14"Okay, this has happened before. I've
- 14:35:17experienced this problem before. Um then
- 14:35:20there's a number of things I can do. I
- 14:35:22can go to the person's manager and ask
- 14:35:24for that person's time back or see if
- 14:35:26the manager has another person on their
- 14:35:27team that can step in and fill in the
- 14:35:29gap. There's things that you can do to
- 14:35:31maybe share time. So, the person works a
- 14:35:34little bit on the previous project and
- 14:35:35then works on your project. Um, you may
- 14:35:39even evaluate, do I need the
- 14:35:40stakeholder? Is this something that uh
- 14:35:43that I I can do without for at least the
- 14:35:45time being or can I push the stakeholder
- 14:35:48out so they can join later and then
- 14:35:50still not impact the project timelines.
- 14:35:53So what I think intuition does there is
- 14:35:55it gives you a sense of what does this
- 14:35:57information that I've just received what
- 14:35:59does it mean for this project and how do
- 14:36:02I incorporate that information now to
- 14:36:04make a good decision or to make a
- 14:36:06decision that's right for the team or a
- 14:36:08decision that is going to help ensure
- 14:36:10that this project continues to move
- 14:36:12forward and intuitions um can help with
- 14:36:15that because they do bring that pre past
- 14:36:17experience to the table as well as um
- 14:36:21kind of your natural dispositions for uh
- 14:36:24for dealing with with complicated issues
- 14:36:26in a project and every project has those
- 14:36:28complicated issues for sure. Um I think
- 14:36:32part of the problem with intuition is
- 14:36:35that it is very it can be very difficult
- 14:36:37to define and
- 14:36:40understanding what your own intuitions
- 14:36:42what you're good at intuitively and what
- 14:36:44you actually need data for can also be
- 14:36:46very tricky. So for example, a project
- 14:36:49manager might think that they have some
- 14:36:50really good intuitions on how long
- 14:36:53something is going to take to
- 14:36:54accomplish. Um whereas you know most
- 14:36:57people need a little bit of data. So if
- 14:36:59you're developing a product and there's
- 14:37:01a certain aspect of that product that um
- 14:37:03is critical for getting the project done
- 14:37:06um having some data so that you say in
- 14:37:08the past this has taken developers this
- 14:37:11much time to put this piece of the
- 14:37:13project together. I'm going to use that
- 14:37:17that information and then add my
- 14:37:19intuition on top of that. I think you
- 14:37:22can use data and then add intuition to
- 14:37:24that data to make better decisions. If
- 14:37:27you say if you just use data, if you say
- 14:37:29it's taken this long in the past and
- 14:37:31it's going to take this long for this
- 14:37:32project without bringing your intuitions
- 14:37:34to the table, I think you miss on miss
- 14:37:36out on something very critical there. I
- 14:37:38think you miss out on a very important
- 14:37:41aspect of using raw data without
- 14:37:44intuition that um adding intuition to
- 14:37:47that data can definitely help you make
- 14:37:49better decisions.
- 14:37:51>> Intuition can be very useful when you're
- 14:37:53in situations where there's incomplete
- 14:37:55information, ambiguity, maybe a crisis
- 14:37:58situation, or you just need to make a
- 14:38:01decision really fast in the moment.
- 14:38:03trusting your gut, going with what you
- 14:38:05think is right in that moment in time is
- 14:38:08very acceptable in my book. Um, but
- 14:38:11always going with your gut and not
- 14:38:13looking for data, facts, and taking the
- 14:38:15time to analyze it and and really make
- 14:38:19an informed decision is not the right
- 14:38:21way to go. You really need to balance
- 14:38:23out as a successful leader your gut
- 14:38:26decisions together with your very
- 14:38:28well-informed decisions. Of course, you
- 14:38:30want to lean towards the side of a
- 14:38:32well-informed decision, but in those
- 14:38:34moments when you need to make a a a gut
- 14:38:38decision or um or use your intui in
- 14:38:42intuition to make a decision when you
- 14:38:43don't have the complete facts, feel
- 14:38:45empowered to do that. The more you do,
- 14:38:48you will get more confident in the
- 14:38:50outcome and in making those decisions.
- 14:38:52But early on, I know it is tough to to
- 14:38:55feel confident that you can take a
- 14:38:56chance and go with it. I think as long
- 14:38:59as you're trying your best in my book,
- 14:39:01um, and you're making the decision or
- 14:39:04you're using your intuition and making a
- 14:39:05gut decision based on the best of your
- 14:39:09abilities, I'm not going to fault
- 14:39:11anybody for that. There may be some
- 14:39:13people who do, but in my book, you're
- 14:39:14trying your best and trying to keep
- 14:39:16things moving forward.
- 14:39:20[Music]
- 14:39:28Welcome to acquiring resources. After
- 14:39:31watching this video, you'll be able to
- 14:39:32recognize the common challenges that
- 14:39:34project managers face when acquiring
- 14:39:36resources. Explain why effective
- 14:39:38negotiation skills are important for
- 14:39:40project managers when acquiring
- 14:39:42resources. Identify the key principles
- 14:39:44of effective negotiation and describe
- 14:39:47how the key principles of effective
- 14:39:48negotiation can be applied to the
- 14:39:50challenges of resource acquisition.
- 14:39:53Acquiring resources needed to complete
- 14:39:54the project successfully is also a
- 14:39:56project manager's responsibility.
- 14:39:59However, acquiring resources can be a
- 14:40:00complex and challenging process. Let's
- 14:40:03explore the most common challenges that
- 14:40:04project managers face when acquiring
- 14:40:06resources.
- 14:40:08One of the biggest challenges project
- 14:40:09managers face when acquiring resources
- 14:40:11is having a limited budget to work with.
- 14:40:13A limited budget can make it difficult
- 14:40:15to obtain the resources needed to
- 14:40:17complete the project successfully.
- 14:40:19Another common challenge is the limited
- 14:40:21availability of resources including
- 14:40:23personnel, equipment or materials.
- 14:40:25Sometimes there may be conflicting
- 14:40:26priorities making it difficult to obtain
- 14:40:28a resource. For example, consider a team
- 14:40:30member shared among multiple projects
- 14:40:33making it challenging to obtain the
- 14:40:34resource. Lack of effective
- 14:40:36communication can lead to
- 14:40:38misunderstandings or confusion about
- 14:40:40resource needs and availability. The
- 14:40:42project manager can implement a few
- 14:40:43actionable resource acquisition
- 14:40:45strategies to mitigate the challenges.
- 14:40:47Let's look at the strategies. Build a
- 14:40:49strong network of colleagues and
- 14:40:51potential resource providers such as
- 14:40:52vendors, suppliers, and subcontractors
- 14:40:55to increase the likelihood of finding
- 14:40:56the necessary resources when they're
- 14:40:58needed. Build relationships with other
- 14:41:00department heads and project managers to
- 14:41:03identify potential conflicts and
- 14:41:05proactively address them. Ensure clear
- 14:41:07and effective communication with
- 14:41:08stakeholders and resource providers,
- 14:41:10including concise documentation on
- 14:41:12timelines, budgets, and deliverables.
- 14:41:14Conduct a costbenefit analysis to
- 14:41:17determine which resources are critical
- 14:41:18to the project success and prioritize
- 14:41:21their acquisition. While a project
- 14:41:23manager may implement one or more
- 14:41:24resource acquisition strategies, they
- 14:41:27may still struggle to acquire the
- 14:41:28required resources.
- 14:41:30Effective negotiation can help project
- 14:41:32managers to overcome some challenges by
- 14:41:34finding mutually beneficial solutions
- 14:41:37that satisfy both the project's needs
- 14:41:39and the resource provider's needs.
- 14:41:41According to the pinach, negotiation is
- 14:41:43a process of communicating,
- 14:41:45collaborating, and compromising to reach
- 14:41:46a mutually acceptable agreement. There
- 14:41:49are six key principles to effective
- 14:41:51negotiation, including be prepared,
- 14:41:53build relationships, listen actively,
- 14:41:56communicate clearly, creatively, solve
- 14:41:59problems, manage emotions. Let's look at
- 14:42:01each principle in detail. Be prepared.
- 14:42:04Before the negotiation begins, the
- 14:42:06project manager should understand the
- 14:42:07negotiation process, identify key
- 14:42:09issues, define objectives, and aim to
- 14:42:11understand the other party's interests.
- 14:42:13The project manager must understand if
- 14:42:15there are any competing priorities or
- 14:42:17challenges the other party may face
- 14:42:19regarding resources. Build
- 14:42:21relationships. When the negotiation
- 14:42:23begins, attempt to build a relationship
- 14:42:25and trust with the other party, which
- 14:42:27can create a positive negotiation
- 14:42:29environment. You can do this by
- 14:42:30expressing your willingness to work with
- 14:42:32the other person and identifying areas
- 14:42:34of common interest. Be sure to listen
- 14:42:36actively. Active listening lets
- 14:42:38negotiators understand the other party's
- 14:42:40interests, concerns, and needs. If
- 14:42:42necessary, repeat back the other party's
- 14:42:44concerns or objections, and ask
- 14:42:46questions to clarify. Communicate
- 14:42:48clearly and assertively to avoid
- 14:42:50misunderstandings and ensure that both
- 14:42:52parties understand each other's needs
- 14:42:54and expectations. Be sure to state your
- 14:42:56resourcing needs and position clearly.
- 14:42:58Think creatively to come up with
- 14:43:00possible solutions. Be willing to
- 14:43:02explore alternative options and make
- 14:43:04concessions when necessary. Finally,
- 14:43:06managing your emotions and maintaining a
- 14:43:09professional demeanor throughout the
- 14:43:10negotiation process is important.
- 14:43:12Negotiation can be a stressful and
- 14:43:14emotional process, but following the key
- 14:43:16principles of effective negotiation can
- 14:43:18help you acquire resources even if you
- 14:43:21face many challenges. In this video, you
- 14:43:23learned that project managers face
- 14:43:25budget, availability, prioritization,
- 14:43:27and communication challenges when
- 14:43:29acquiring resources. Project managers
- 14:43:31can mitigate these challenges by
- 14:43:32networking, building relationships,
- 14:43:34clearly communicating, and doing
- 14:43:36costbenefit analysis. Effective
- 14:43:39negotiation is a process of
- 14:43:40communicating, collaborating, and
- 14:43:42compromising with other parties to come
- 14:43:44to a mutually beneficial solution.
- 14:43:46Project managers can effectively
- 14:43:48negotiate by following six key
- 14:43:50principles, including preparing for the
- 14:43:52negotiation, building rapport, actively
- 14:43:54listening during negotiations, clearly
- 14:43:57and assertively communicating needs,
- 14:43:59creatively problemolving with other
- 14:44:01parties, and managing their emotions.
- 14:44:05[Music]
- 14:44:14Welcome to building trust. After
- 14:44:16watching this video, you'll be able to
- 14:44:18summarize Lenion's five dysfunctions of
- 14:44:20a team. Identify methods to build trust.
- 14:44:23Trust is a key factor that helps the
- 14:44:25project manager, team, and stakeholders
- 14:44:27ensure the project is successfully
- 14:44:29delivered on time and on budget. When a
- 14:44:31team lacks trust, part of the project
- 14:44:33manager's role is to determine reasons
- 14:44:35for the trust deficit. Lenchon's five
- 14:44:37dysfunctions of a team model describes
- 14:44:39five common dysfunctions that can occur
- 14:44:42within a team which can impede trust and
- 14:44:44collaboration. The dysfunctions build
- 14:44:46upon one another. The first or the
- 14:44:48bottommost layer of dysfunction is the
- 14:44:50absence of trust. When team members are
- 14:44:52unwilling to be vulnerable and open up
- 14:44:53to each other, it creates a lack of
- 14:44:55trust within the team. The next layer is
- 14:44:57fear of conflict. Healthy debate and
- 14:44:59conflict are good for a team's growth.
- 14:45:01When team members fear voicing their
- 14:45:03opinions and ideas, it can result in
- 14:45:04poor decision-making. The third layer is
- 14:45:07a lack of commitment. Team members may
- 14:45:09lack motivation and commitment when they
- 14:45:11don't align with project goals and
- 14:45:12objectives. The fourth layer is
- 14:45:14avoidance of accountability. Team
- 14:45:16members may not feel accountable or
- 14:45:18responsible for the project outcomes.
- 14:45:20This can result from a lack of
- 14:45:21commitment or motivation. The final
- 14:45:24layer is inattention to results. When
- 14:45:26team members prioritize their individual
- 14:45:28goals over the project goals, it can
- 14:45:30lead to a lack of focus on achieving the
- 14:45:32desired outcomes. Lenion's dysfunction
- 14:45:34model shows that the absence of trust
- 14:45:36makes up the bottom layer. Lenion
- 14:45:38defines trust as the confidence among
- 14:45:40team members that their peers intentions
- 14:45:42are good and that there's no reason to
- 14:45:44be protective and careful around the
- 14:45:46group. He describes trust as the
- 14:45:47willingness of team members to be
- 14:45:49vulnerable with each other and to admit
- 14:45:50their weaknesses and mistakes without
- 14:45:52fear of judgment or reprisal. In other
- 14:45:54words, team members trust each other
- 14:45:56when they feel safe enough to be open
- 14:45:58and honest about their thoughts,
- 14:45:59feelings, and intentions. According to
- 14:46:01Lenion, trust is critical because it
- 14:46:03sets the tone for the rest of the team's
- 14:46:05interactions. Without trust, team
- 14:46:07members are more likely to avoid
- 14:46:09conflict, withhold their opinions, and
- 14:46:10prioritize their individual goals over
- 14:46:13the project outcomes. Trust is essential
- 14:46:15for building strong relationships and
- 14:46:17effective collaboration. And it requires
- 14:46:19a commitment from all team members to be
- 14:46:21open and honest with each other. How do
- 14:46:23you as a project manager help a team
- 14:46:25build trust? Building trust is not an
- 14:46:27easy exercise. Building trust often
- 14:46:29requires teams to spend ample time
- 14:46:31together. It also requires team members
- 14:46:34to have a deep understanding of others
- 14:46:35unique skills, abilities, and
- 14:46:37personalities. It requires team members
- 14:46:39to fulfill their commitments and
- 14:46:41complete tasks as promised consistently.
- 14:46:44Finally, trust is earned through a track
- 14:46:46record of honesty, transparency, and
- 14:46:48accountability. There are also a few
- 14:46:50team exercises you can leverage to help
- 14:46:52build trust more quickly. For example,
- 14:46:54imagine a small digital marketing agency
- 14:46:56that has just been acquired by a more
- 14:46:58prominent, more traditional marketing
- 14:47:00firm. The project manager believes
- 14:47:02there's a lack of trust in the team due
- 14:47:03to different personalities,
- 14:47:05communication styles, focus areas, and
- 14:47:07approaches. One way the project manager
- 14:47:09can help the team gain a deeper
- 14:47:11understanding of other team members to
- 14:47:13build trust is to do an exercise where
- 14:47:15team members share information about
- 14:47:17themselves. The exercises don't need to
- 14:47:19be incredibly personal in nature, but
- 14:47:21should provide some interesting or
- 14:47:23unique information about each member.
- 14:47:25Some examples include two truths and a
- 14:47:27lie. In this game, each team member
- 14:47:29shares three statements about
- 14:47:30themselves, two of which are true and
- 14:47:32one that's false. The other team members
- 14:47:34must guess which statement is the lie.
- 14:47:36Human bingo. Create a bingo card with
- 14:47:38different personal characteristics such
- 14:47:39as plays an instrument, has traveled to
- 14:47:41a foreign country, or speaks more than
- 14:47:43one language. Team members must talk to
- 14:47:45each other and find someone who fits
- 14:47:47each characteristic until they have a
- 14:47:49full bingo card. Life mapping. Have each
- 14:47:52team member create a short visual
- 14:47:53timeline of the most important impactful
- 14:47:55events of their life and share key
- 14:47:57points with the team. You can ask team
- 14:47:59members to keep the timeline
- 14:48:00professional in nature and focus on
- 14:48:02things like educational milestones,
- 14:48:04career milestones, and inflection points
- 14:48:06where they learned a new skill or had a
- 14:48:08life-changing conversation with a
- 14:48:10mentor. Now imagine the new marketing
- 14:48:12team is working on a complex project
- 14:48:14with tight deadlines and multiple
- 14:48:16dependencies. The team members do not
- 14:48:18communicate regularly with each other or
- 14:48:20with the project manager and they avoid
- 14:48:22sharing their progress, challenges or
- 14:48:24ideas. They also do not give or receive
- 14:48:26constructive feedback on their work.
- 14:48:28When the team does communicate,
- 14:48:30conversations quickly turn into heated
- 14:48:32debates. To build trust in this
- 14:48:34scenario, a project manager may have the
- 14:48:36team take a personality assessment and
- 14:48:38share their results with key members of
- 14:48:39their team. Understanding different
- 14:48:41personality types and preferences can
- 14:48:43help team members understand their own
- 14:48:45strengths and weaknesses and communicate
- 14:48:47more effectively with others who have
- 14:48:48different preferences. A few of the most
- 14:48:51popular assessments include MyersBriggs
- 14:48:53type indicator, MBTI. This assessment
- 14:48:56measures personality preferences based
- 14:48:58on four dichotoies. Extroversion,
- 14:49:01introversion, sensing, intuition,
- 14:49:03thinking, feeling, and judging,
- 14:49:04perceiving. DISC. This assessment
- 14:49:07measures behavioral styles based on four
- 14:49:09dimensions: dominance, influence,
- 14:49:12steadiness, and conscientiousness.
- 14:49:14Strengthsfinder. This assessment
- 14:49:16measures individual strengths across 34
- 14:49:18talent themes. Insights and emerges out
- 14:49:22an individual's thinking attributes into
- 14:49:24four styles to determine work
- 14:49:25preferences, communication styles, and
- 14:49:27more. By applying some of these
- 14:49:28strategies, the project manager of the
- 14:49:30newly created marketing team can begin
- 14:49:32to build trust in the team. Over time,
- 14:49:35as the team members fulfill their
- 14:49:36commitments and continue to be more
- 14:49:38transparent, trust will continue to
- 14:49:40grow. In this video, you learned that
- 14:49:42Lention's five dysfunctions of a team
- 14:49:44include absence of trust, fear of
- 14:49:46conflict, lack of commitment, avoidance
- 14:49:48of accountability, and inattention to
- 14:49:50results. Trust is the confidence among
- 14:49:53team members that their peers intentions
- 14:49:55are good and that there's no reason to
- 14:49:57be protective and careful around the
- 14:49:58group. Building trust is not easy and it
- 14:50:01requires time, credibility, and an
- 14:50:02understanding of team members unique
- 14:50:04attributes. Project managers can
- 14:50:06leverage exercises such as unique
- 14:50:08attributes exercises and personality
- 14:50:10assessments to build trust more quickly.
- 14:50:13[Music]
- 14:50:21Welcome to expert viewpoints, inspiring
- 14:50:23trust within teams. In this video, we
- 14:50:26will hear leaders and experts describe
- 14:50:28the methods they use to inspire trust
- 14:50:30and develop rapport with and between
- 14:50:33team members and stakeholders.
- 14:50:35What methods do you use to inspire trust
- 14:50:38and develop rapport with and between
- 14:50:39team members and stakeholders? Generally
- 14:50:42speaking, developing trust and and
- 14:50:44rapport I think happens through hon with
- 14:50:47honesty by allowing yourself to be v
- 14:50:49vulnerable. Um not coming in as I know
- 14:50:53everything I'm going to lead this
- 14:50:54project it's going to be great but
- 14:50:56really building up a team of
- 14:50:58co-ownership co-responsibility
- 14:51:00capitalizing on people's strengths and
- 14:51:03diminishing the effects the effects of
- 14:51:05people's weaknesses. Um openness and
- 14:51:08being willing to hear feedback about
- 14:51:10yourself. I think also really establish
- 14:51:13trust. Managing your emotions is huge.
- 14:51:16Um if you're one to fly off the handle
- 14:51:18at the drop of a hat, it's going to be
- 14:51:21difficult for people to want to work
- 14:51:23with you or want to um get into a
- 14:51:26trusting relationship if they're not
- 14:51:28sure if you're going to react in an
- 14:51:29uncomfortable way. So managing your
- 14:51:31emotions is also critical, I think, to
- 14:51:33establishing trust. Following through
- 14:51:36with what you've committed to is equally
- 14:51:39um if not more important and not
- 14:51:43overpromising and underdelivering. Um
- 14:51:45you know occasionally that can happen
- 14:51:47but if overpromising and underdelivering
- 14:51:49becomes a consistent
- 14:51:51consistent event for you then then all
- 14:51:54trust is going to be difficult to
- 14:51:56achieve.
- 14:51:58One of my favorite authors is Louise
- 14:52:00Penny and she created a fictional
- 14:52:03inspector gamash and he has uh four
- 14:52:08sentences that he says leads to wisdom
- 14:52:12but I think it they also lead to trust.
- 14:52:14And so he said his guidance to his
- 14:52:17fictional police team is you have to
- 14:52:19learn these four sentences and you have
- 14:52:21to mean them when you say them. And the
- 14:52:24four sentences are
- 14:52:26I need help, I don't know, I'm sorry, I
- 14:52:31was wrong. And I totally agree with
- 14:52:34those four. So think about those and how
- 14:52:36you can incorporate them into your
- 14:52:38project life and and into your personal
- 14:52:41life. And good luck with building trust.
- 14:52:45Building trust on a team is sometimes a
- 14:52:48challenge for project managers. But some
- 14:52:51of the ways that I have dealt with this
- 14:52:53in the past is by using personality
- 14:52:57assessments
- 14:52:58to understand the different
- 14:53:00personalities on the team and then
- 14:53:02having the team share some of those
- 14:53:06findings from those assessments with
- 14:53:08their other team members. I'm also a
- 14:53:10really big fan of just taking some time
- 14:53:14during meetings or um at the beginning
- 14:53:17of a call to have a little bit of a
- 14:53:20conversation with members on the team
- 14:53:23and allowing them to share things that
- 14:53:26are personal hobbies or
- 14:53:29um
- 14:53:32stories about their life or things that
- 14:53:34are going on in their life, things that
- 14:53:36they're looking forward to. Um, I'm a
- 14:53:39I'm a big believer that building trust
- 14:53:42is really about building those
- 14:53:44relationships between your team members
- 14:53:48and finding areas where your team
- 14:53:54really can connect outside of the work
- 14:53:57that they're doing. So assuming that
- 14:54:00everyone on the team has a shared
- 14:54:02mission to complete the project or for
- 14:54:05the work that they're doing for the
- 14:54:07organization or the company that you're
- 14:54:08working for.
- 14:54:10Trust needs to be built outside of that
- 14:54:13shared mission as well. And one way to
- 14:54:17do that is to really find out about
- 14:54:20people outside of work and then connect
- 14:54:22people who have similar interests or
- 14:54:25similar hobbies. maybe they're in
- 14:54:27similar stages in their life and they
- 14:54:29can connect on a deeper level than than
- 14:54:32just what they're doing in their
- 14:54:34daytoday jobs. Um I'm also a fan of some
- 14:54:40team building exercises. Sometimes they
- 14:54:43get a bad rap. Um there are people who
- 14:54:46don't like to participate in them. But I
- 14:54:49do believe that doing some short team
- 14:54:52building exercises that
- 14:54:56can bring people together in a fun way
- 14:54:59is a great way to build trust. I also
- 14:55:02think that as a project manager and as a
- 14:55:04leader, trust comes from the top. And if
- 14:55:09your team can trust you and you've shown
- 14:55:12yourself to be credible and trustworthy
- 14:55:15and that when you say you're going to do
- 14:55:17something, you do that thing and you get
- 14:55:20it done when you say you're going to get
- 14:55:21it done. That also helps them become
- 14:55:25more trustworthy of one another because
- 14:55:27you're setting the tone for what trust
- 14:55:30and rapport looks like on the team.
- 14:55:33There is a gentleman named Patrick
- 14:55:35Lenion who wrote a book entitled The
- 14:55:37Five Dysfunctions of a Team. And I
- 14:55:40believe his quote says it best.
- 14:55:42According to Patrick Lenion, and I
- 14:55:45quote, "Trust is about vulnerability.
- 14:55:48Team members who trust one another learn
- 14:55:51to be comfortable being open, even
- 14:55:54exposed to one another around their
- 14:55:56failures, weaknesses, and even fears."
- 14:56:00unquote.
- 14:56:01With that, what are four things that a
- 14:56:03project manager can do to create a
- 14:56:06trusting team environment?
- 14:56:08Number one, communicate effectively.
- 14:56:11Work hard to gain stakeholder
- 14:56:13acceptance, support, and enthusiasm for
- 14:56:17both the project approach and outcomes.
- 14:56:20Number two, follow Lenion's guidance.
- 14:56:25Take the time to get to know your team.
- 14:56:28Be vulnerable yourself and share. Create
- 14:56:31an environment where the team members
- 14:56:33know they can be open, let down their
- 14:56:36guards, and feel safe. Number three,
- 14:56:40empower the team. Encourage each member
- 14:56:43to own and develop their own working
- 14:56:45environment, agreements, and decisions.
- 14:56:49And finally, number four, develop an
- 14:56:52approach that aligns with the
- 14:56:53organizational culture. First, I like to
- 14:56:56build strong relationships,
- 14:56:59effective communication, and then of
- 14:57:01course lead by example by being a
- 14:57:03servant leader and with a collaborative
- 14:57:06approach. Most importantly, don't forget
- 14:57:09to celebrate success.
- 14:57:13At the start of a project, I typically
- 14:57:15express my excitement for the project
- 14:57:17and maybe a personal connection I have
- 14:57:19to it. People want to know that you
- 14:57:21genuinely care about it being
- 14:57:23successful.
- 14:57:24I also make a point to check in with
- 14:57:26people. Usually at the start of a
- 14:57:28meeting, I'll say, "Hey, is there
- 14:57:30anything making you nervous right now?
- 14:57:32How are we feeling?" It's important to
- 14:57:34take the pulse.
- 14:57:35Showing empathy is critical, too. Maybe
- 14:57:39you have a client that uh missed a
- 14:57:42meeting because his product launch
- 14:57:44wasn't going well. You could say, "Hey,
- 14:57:46maybe we'll skip this week's meeting and
- 14:57:48I'll just chat you if anything urgent
- 14:57:50comes up." Good luck out there. It shows
- 14:57:52you care. And lastly, finding solutions
- 14:57:55to your teammates's problems is a great
- 14:57:58way to de develop rapport. You could say
- 14:58:01something like, "Hey, this task seems
- 14:58:02like it's really frustrating. What can
- 14:58:04we do to make this a better experience
- 14:58:06for you?" And then start brainstorming
- 14:58:08solutions together. This is probably the
- 14:58:10best way I've experience to inspire
- 14:58:12trust.
- 14:58:16[Music]
- 14:58:24Welcome to emotional intelligence. After
- 14:58:27watching this video, you'll be able to
- 14:58:28define the five components of the
- 14:58:30emotional intelligence or EQ theory.
- 14:58:33Summarize how project managers can use
- 14:58:35EQ and identify methods to improve EQ.
- 14:58:38Project managers often need to use their
- 14:58:40emotional skills to inspire team
- 14:58:42confidence and commitment. Since project
- 14:58:44managers interact and influence many
- 14:58:46individuals in an organization, they can
- 14:58:48have a large impact. Imagine two people
- 14:58:50interacting and then imagine the
- 14:58:52interaction cascading into project
- 14:58:54teams, groups, and the whole
- 14:58:55organization. That is the power of
- 14:58:57influence. Emotional intelligence or EQ
- 14:59:00determines how well a project manager
- 14:59:01can form and maintain relationships as
- 14:59:04their decisions can impact many
- 14:59:05relationships in a complex network. The
- 14:59:08Project Management Institute or PMI
- 14:59:10defines emotional intelligence as the
- 14:59:12ability to identify, assess, and manage
- 14:59:14the emotions of oneself and other people
- 14:59:17as well as the collective emotions of
- 14:59:18groups of people. The emotional
- 14:59:20intelligence model, which is used
- 14:59:22globally, includes five components.
- 14:59:24Self-awareness, which is the act of
- 14:59:26knowing your own emotions and how they
- 14:59:27affect your thoughts and behavior.
- 14:59:29Self-regulation, which involves managing
- 14:59:31your emotions and impulses so that you
- 14:59:33can respond appropriately to situations.
- 14:59:35Motivation, which is the ability to
- 14:59:37motivate yourself and others to achieve
- 14:59:39goals. Empathy, which is the
- 14:59:41understanding of other people's emotions
- 14:59:43and being able to respond appropriately.
- 14:59:45And social skills include the ability to
- 14:59:47communicate effectively with others,
- 14:59:49resolve conflicts, and build
- 14:59:50relationships.
- 14:59:52Let's understand how a project manager
- 14:59:53can make use of the components of EQ.
- 14:59:56Having knowledge about emotional
- 14:59:57intelligence can help a project manager
- 14:59:59in many ways, such as managing
- 15:00:00stakeholders, fostering trust, making
- 15:00:02decisions, leading teams. Let's look at
- 15:00:04an example of EQ at work. Rose is a
- 15:00:07project manager managing a project to
- 15:00:09replace citywide street lights. As the
- 15:00:11project progresses, there's a
- 15:00:12disagreement between the city officials
- 15:00:13and the lighting vendors regarding the
- 15:00:15delay in project timelines. The lighting
- 15:00:18vendors have had an unforeseen issue
- 15:00:19causing a delay in material supply. Rose
- 15:00:22listens to the perspectives of both
- 15:00:23parties and understands their
- 15:00:25challenges. Without being judgmental or
- 15:00:27biased, Rose focuses on the problem at
- 15:00:29hand. This helps her foster trust with
- 15:00:31both parties. Further, Rose is able to
- 15:00:33manage both parties to help them agree
- 15:00:35to a new acceptable timeline. A strong
- 15:00:38EQ is an asset for any project manager.
- 15:00:40Every project manager should test their
- 15:00:42current EQ level and work toward
- 15:00:44improvement if required. There are many
- 15:00:46emotional intelligence assessments that
- 15:00:48you can take to test EQ levels. These
- 15:00:50include tests such as the emotional and
- 15:00:52social competency inventory, the 6
- 15:00:54seconds emotional intelligence
- 15:00:56assessment, and team emotional
- 15:00:57intelligence. Some techniques to improve
- 15:00:59EQ include self-reflection, engaging
- 15:01:02with your own emotions, and getting
- 15:01:03feedback from leaders and peers to
- 15:01:05better understand how you're perceived.
- 15:01:07In this video, you learned that
- 15:01:08emotional intelligence, or EQ, is the
- 15:01:11ability to identify, assess, and manage
- 15:01:13the emotions of oneself and other
- 15:01:15people, as well as the collective
- 15:01:16emotions of groups of people. The EQ
- 15:01:19model includes the five components of
- 15:01:21self-awareness, self-regulation,
- 15:01:23motivation, empathy, and social skills.
- 15:01:25EQ helps project managers foster trust,
- 15:01:28make more rational decisions, manage
- 15:01:30stakeholders, become better leaders, and
- 15:01:32improve project outcomes. Project
- 15:01:34managers assess their EQ with a number
- 15:01:36of assessments and use techniques such
- 15:01:38as self-reflection and gathering
- 15:01:40feedback to improve their EQ.
- 15:01:44[Music]
- 15:01:53Welcome to adaptability and resilience.
- 15:01:55After watching this video, you'll be
- 15:01:57able to define adaptability and
- 15:01:58resilience, discuss examples of
- 15:02:00adaptability and resilience, implement
- 15:02:03adaptability and resilience traits to
- 15:02:05effective communications and leadership.
- 15:02:07Netflix started as a DVD rental by mail
- 15:02:10service. Customers could order DVDs
- 15:02:12online and receive them in the mail. 10
- 15:02:14years later, Netflix, powered by new
- 15:02:16streaming technologies, launched its
- 15:02:17online streaming service, allowing
- 15:02:19customers to watch movies and TV shows
- 15:02:21directly on their computers. Since then,
- 15:02:24video streaming has become one of the
- 15:02:25primary ways that people consume media.
- 15:02:28But even with the challenge of increased
- 15:02:29competition, Netflix has continued to
- 15:02:32evolve and is considered a leading
- 15:02:33streaming platform. This example
- 15:02:36illustrates the leadership
- 15:02:36characteristics of adaptability and
- 15:02:38resilience. Netflix has adapted over the
- 15:02:41years to stay relevant and they have
- 15:02:42shown resilience by continually moving
- 15:02:44forward despite challenges such as a
- 15:02:46heavily competitive market. Adaptability
- 15:02:48and resilience are two essential
- 15:02:50qualities necessary for effective
- 15:02:51leadership. Adaptability refers to the
- 15:02:54ability to adjust to changing
- 15:02:55circumstances and situations. Let's look
- 15:02:58at some of the benefits of being
- 15:02:59adaptable. Adaptable leaders can quickly
- 15:03:01assess new situations, make necessary
- 15:03:03changes to their plans, and effectively
- 15:03:06navigate unexpected challenges. For
- 15:03:08example, during CO 19, organizations had
- 15:03:10to adapt quickly to the idea of a remote
- 15:03:12workforce and make the required
- 15:03:14adjustments to technology and behaviors.
- 15:03:16Those who struggled perished.
- 15:03:18Resilience, however, refers to
- 15:03:19recovering quickly from setbacks and
- 15:03:21failures. Resilient leaders can maintain
- 15:03:23their focus and motivation even when
- 15:03:25things don't go as planned. A resilient
- 15:03:28leader might face a significant setback
- 15:03:30such as losing a key employee or a
- 15:03:32failed product launch. Rather than
- 15:03:34giving up, they can use the experience
- 15:03:35as a learning opportunity and develop a
- 15:03:37new plan. They maintain their focus and
- 15:03:39motivation and can inspire their team to
- 15:03:41do the same. Adaptability and resilience
- 15:03:44are good traits for a project manager to
- 15:03:46have. Some common ways that project
- 15:03:48managers need to apply adaptability and
- 15:03:50resilience are the following. Adjusting
- 15:03:52communication style, being open to
- 15:03:54feedback, embracing change, staying
- 15:03:56focused. Let's look at some examples to
- 15:03:58understand adaptability and resilience
- 15:04:00better. When many companies shifted to
- 15:04:02remote work during CO 19, there was a
- 15:04:04huge impact on communication between
- 15:04:06team members and stakeholders. Short
- 15:04:08hallway conversations and midday coffee
- 15:04:10brainstorms were no longer possible and
- 15:04:12asynchronous communication methods like
- 15:04:14team chats became even more popular. In
- 15:04:17this scenario, project managers had to
- 15:04:19quickly study and adapt to their team
- 15:04:20members communication styles and
- 15:04:22preferences. Amidst all this, the
- 15:04:24project managers had to ensure everyone
- 15:04:26followed the organization's work
- 15:04:27policies. The project managers tried to
- 15:04:30adapt their communication approaches to
- 15:04:31different communication preferences,
- 15:04:33which helped keep teams engaged and
- 15:04:35motivated to work towards project goals.
- 15:04:37In the end, success came to project
- 15:04:39managers who could adapt to change.
- 15:04:41Here's another example. Imagine a
- 15:04:43project manager leading a construction
- 15:04:45project to build a new office block. The
- 15:04:47project manager receives news of supply
- 15:04:49shortages for a special type of wood and
- 15:04:51steel specified in the development
- 15:04:52plans. Changing the material will
- 15:04:55require changing the building permits.
- 15:04:57In this scenario, the project manager
- 15:04:59should not make a rash decision.
- 15:05:01Instead, the project manager can contact
- 15:05:03team members, stakeholders, and other
- 15:05:04project leaders for feedback and ideas.
- 15:05:07For example, construction contractors
- 15:05:08can provide feedback on alternative
- 15:05:10materials. Local officials and
- 15:05:12regulators can provide feedback on how
- 15:05:14to expedite the permit process and
- 15:05:16suggest alternative solutions to meet
- 15:05:18any regulatory requirements. Resilience
- 15:05:20is key. As a good leader, a project
- 15:05:22manager should constantly look for
- 15:05:24solutions and never give up. In this
- 15:05:26video, you learned that adaptability and
- 15:05:28resilience are two important qualities
- 15:05:30that are necessary for effective
- 15:05:32leadership. Adaptability refers to the
- 15:05:35ability to adjust to changing
- 15:05:36circumstances and situations. Resilience
- 15:05:39refers to the ability to recover quickly
- 15:05:41from setbacks and failures. Project
- 15:05:43managers can apply adaptability and
- 15:05:45resilience by adjusting their
- 15:05:46communication styles, being open to
- 15:05:49feedback, embracing change, and staying
- 15:05:50focused.
- 15:05:54[Music]
- 15:06:01Welcome to expert viewpoints overcoming
- 15:06:03resource challenges. In this video, we
- 15:06:06will hear experts and leaders discuss
- 15:06:07overcoming resource challenges.
- 15:06:10How did you overcome resource planning
- 15:06:12challenges you have encountered?
- 15:06:16>> Resource planning challenges can be very
- 15:06:18real and very critical. And when you get
- 15:06:21to a larger size company or you start
- 15:06:24having multiple projects running in
- 15:06:26parallel of competing priority, resource
- 15:06:29management and capacity planning becomes
- 15:06:31more difficult. So one, you need to have
- 15:06:34clear understanding as a resource
- 15:06:36planner of what the tasks are, how long
- 15:06:38they're going to take in general, and
- 15:06:40when your projects are going to wrap up
- 15:06:42so that you can you can start the the
- 15:06:45synchronized conducting of resourcing.
- 15:06:48Second is once you've come up with good
- 15:06:51resourcing plans, you see the eb and
- 15:06:53flow of the projects, you begin to
- 15:06:56identify peaks and valleys. Um, for us,
- 15:06:59July and September tend to be slower
- 15:07:01months. And so, how can I take advantage
- 15:07:04as a resource planner of slower months
- 15:07:07when December and through April is a
- 15:07:10just insane race to get work done? Um,
- 15:07:13so I look for trends uh as far as our
- 15:07:16projects. I look for resource alignment.
- 15:07:19Are there project teams that work really
- 15:07:21well together on specific projects? Are
- 15:07:24there others where it just doesn't work
- 15:07:25out? We have to rematch. Um I look for
- 15:07:28that and then I also bring in other
- 15:07:31people. So within our organization at
- 15:07:33scaleup, each team is responsible for
- 15:07:35their own resources, but managing and
- 15:07:38prioritize prioritizing projects across
- 15:07:41the entire company is my responsibility.
- 15:07:44And so I have to understand everybody's
- 15:07:46schedules almost and commitments and and
- 15:07:49project commitments so that I can advise
- 15:07:52swaps. Um we need more instructional
- 15:07:54designers here or I've got a high
- 15:07:56priority there. How can I send people
- 15:07:59over to the right spots at the right
- 15:08:01time and and not completely derail other
- 15:08:03projects that need to continue? So to do
- 15:08:06that um I meet with all my my leads, all
- 15:08:10my managers and then all of our
- 15:08:12supporting teams as well. and understand
- 15:08:14workloads, capacity challenges, and then
- 15:08:17I can make those decisions better
- 15:08:19informed in the moment. I don't get them
- 15:08:21all right, but I try to be as informed
- 15:08:24as I can.
- 15:08:26I would say the greatest resource
- 15:08:28challenge I encounter is a failure to
- 15:08:31plan and manage resource risks. A
- 15:08:34project requires a defined number of
- 15:08:37personnel, equipment, supplies,
- 15:08:39materials,
- 15:08:41and potentially other miscellaneous
- 15:08:43resources such as licenses or permits.
- 15:08:46Unfortunately, many project managers
- 15:08:49assume that resources will be available
- 15:08:51when needed
- 15:08:53and find this assumption was erroneous
- 15:08:55as the project progresses. Planning is
- 15:08:58the key. So, the logical follow-up
- 15:09:00question is how do you overcome them?
- 15:09:03Well, let's share a step-by-step
- 15:09:05approach and see if we can answer this
- 15:09:07question. Step number one, break out the
- 15:09:10project into phases and chronological
- 15:09:13activities that must be accomplished.
- 15:09:16The best tool to accomplish this is
- 15:09:18referred to as a work breakdown
- 15:09:21structure or WBS.
- 15:09:24Step number two, assign core team
- 15:09:27members who are knowledgeable on each
- 15:09:30activity in that work breakdown
- 15:09:32structure. It is their job to define all
- 15:09:36resource requirements for that
- 15:09:39particular activity.
- 15:09:41Step number three, document all
- 15:09:44activities and resource requirements on
- 15:09:46a tool called the resource breakdown
- 15:09:49structure. This tool defines each
- 15:09:52resource required by activity and
- 15:09:56defines when the resource will be
- 15:09:58required. And finally, determine who
- 15:10:02manages and distributes the resources
- 15:10:04you need. Share your time phased
- 15:10:07resource breakdown structure with these
- 15:10:10individuals.
- 15:10:11Identify any risks upfront and begin
- 15:10:14working those responses ahead of time.
- 15:10:17I was working on a project a few years
- 15:10:19ago with a company that I was with and I
- 15:10:21was leading a team to redo the website
- 15:10:26of a major tech company and my team was
- 15:10:30responsible for creating content for
- 15:10:32about 30 pages of the website and we
- 15:10:37only had one content writer at the time.
- 15:10:39And as we were looking at the project
- 15:10:41schedule and trying to figure out how we
- 15:10:43were going to get everything done, we
- 15:10:45realized there was no way that we would
- 15:10:47be able to complete the project with
- 15:10:49just one resource. So I was facing some
- 15:10:52resourcing challenges. There was not
- 15:10:55anyone else that was available on
- 15:10:59different teams or other teams to
- 15:11:01support my content writer. and we really
- 15:11:04just needed some folks to uh write
- 15:11:08content for the website. So, I actually
- 15:11:11had to go to the
- 15:11:14manager that was above me to let her
- 15:11:18know first of all that we were going to
- 15:11:20have resourcing issues and that we had
- 15:11:22resourcing issues and that the timeline
- 15:11:24was going to be impacted if we didn't
- 15:11:27get any more resources. And in working
- 15:11:30with her, we discussed that there was
- 15:11:33potentially a budget to bring on some
- 15:11:35more resources, but it also wasn't her
- 15:11:38decision. So, her and I had to come up
- 15:11:41with a plan. How many resources did we
- 15:11:44actually think that we were going to
- 15:11:46need? How long did we think that we were
- 15:11:48going to need those resources for? What
- 15:11:51skills did those resources need to have?
- 15:11:54And then what was the available budget
- 15:11:56that we had to spend on those resources?
- 15:11:59And then we actually took that to our
- 15:12:01VP, that plan to our VP and requested
- 15:12:05that we get some contracting resources
- 15:12:08just for the duration of the project. So
- 15:12:11her and I had to put together this plan
- 15:12:14and then we pitched it to the VP of our
- 15:12:16department who um approved the use of
- 15:12:21contractors and approved our plan. But
- 15:12:24then I was stuck because I needed the
- 15:12:27resources. I had the money for the
- 15:12:29resources now and I was approved to get
- 15:12:31the resources, but I still didn't have
- 15:12:33those resources. So, I actually had to
- 15:12:36and I needed them very quickly. So, I
- 15:12:39actually had to tap some people in my
- 15:12:41network to ask them
- 15:12:44a if they wanted to to do this work, if
- 15:12:47they were available to work, and if they
- 15:12:49wanted to do this work, and if they
- 15:12:52didn't, if they knew anyone who would be
- 15:12:54available to do that work, um, and had
- 15:12:57the skill set that we needed. And so
- 15:12:59within a few days of getting the budget
- 15:13:01and the plan approved, I was doing
- 15:13:04interviews and uh talking to some people
- 15:13:07that we could use as contracting
- 15:13:10resources. And we were really able to
- 15:13:13find just two or three people who could
- 15:13:16work for a short amount of time. They
- 15:13:19were uh willing to do the role. They had
- 15:13:22the skills that we needed and we were
- 15:13:24able to get those people um within our
- 15:13:27budget.
- 15:13:32[Music]
- 15:13:41Welcome to introduction to agile
- 15:13:42development in scrum. I'm John Rafrano
- 15:13:45and I'll be your instructor throughout
- 15:13:46this course that not only teaches you
- 15:13:48what agile is but introduces you to the
- 15:13:50tools and techniques that I have used
- 15:13:52over the years to become agile.
- 15:13:55According to Project Management
- 15:13:56Institute, more than 70% of
- 15:13:58organizations have incorporated some
- 15:14:00agile approaches and 77% of companies
- 15:14:03adopt scrum. Additionally, more than 25%
- 15:14:06of manufacturing firms use agile
- 15:14:09exclusively. And based on research from
- 15:14:10Price Waterhouse Coopers, agile projects
- 15:14:13are 28% more successful than traditional
- 15:14:16projects. Unfortunately, 47% of all
- 15:14:19agile transformations fail according to
- 15:14:21Forbes. 47%. That's almost half. Why do
- 15:14:25you think that is? One study by version
- 15:14:28one shows the number one reason agile
- 15:14:30projects fail is inexperienced with
- 15:14:32implementing and integrating the agile
- 15:14:34methodology. You see, agile is not just
- 15:14:36a process that you follow. It's a
- 15:14:39mindset that you become. It's a
- 15:14:41philosophy that requires you to think
- 15:14:43differently about managing teams and
- 15:14:45projects. Executive leadership needs to
- 15:14:48change their long-term focus and instead
- 15:14:51focus on delivering value quickly and
- 15:14:53iteratively to delight their customers.
- 15:14:56In order to succeed at becoming agile,
- 15:14:58you must change the company culture.
- 15:15:01Another reason agile projects fail is
- 15:15:02that agile is not something you could
- 15:15:04simply learn from a book. I like to use
- 15:15:06the analogy of learning how to drive a
- 15:15:08car. Those of you who drive No. They
- 15:15:10they don't give you the keys to the car
- 15:15:11in the owner's manual and say, "Here, go
- 15:15:13learn how to drive." No. Someone who's
- 15:15:16driven before usually goes out with you
- 15:15:18sitting in the passenger seat telling
- 15:15:19you what to watch out for, how hard to
- 15:15:21press on the gas or the brake pedal. You
- 15:15:24have to practice with an instructor to
- 15:15:27acquire the skills to drive. Agile is a
- 15:15:30lot like that. For this course, I will
- 15:15:32be instructing you on not only what to
- 15:15:34do, but what to look out for. We'll
- 15:15:37discuss both patterns and anti-atterns
- 15:15:40because recognizing when something is
- 15:15:42wrong is just as important as knowing
- 15:15:45how to do something right. You'll learn
- 15:15:47the importance of being organized into
- 15:15:49small coll-located crossfunctional teams
- 15:15:52and how to empower your teams to be
- 15:15:54self-managing so they could make
- 15:15:56decisions faster. I'll teach you how to
- 15:15:58perform agile planning with practical
- 15:16:00examples taken from software development
- 15:16:03that you can apply to your own situation
- 15:16:05regardless of what you're developing.
- 15:16:08You'll see how concepts from lean
- 15:16:10manufacturing have found their way into
- 15:16:11agile and scrum and how at the end of
- 15:16:13every iteration, you should ask
- 15:16:15yourself, do we pivot or persevere? In
- 15:16:18other words, should we try change
- 15:16:19course, try something new, or keep going
- 15:16:22the way you are?
- 15:16:24This course will equip you with what you
- 15:16:26need to be successful in implementing
- 15:16:28agile in your organization. So absorb
- 15:16:31the videos, reinforce your learning with
- 15:16:33the quizzes, and use the discussion
- 15:16:35forums to talk with your peers and
- 15:16:37classmates. Like anything else, the more
- 15:16:40you practice, the better you get. So
- 15:16:42make sure you challenge yourself to
- 15:16:43complete the hands-on final module at
- 15:16:45the end and start building your agile
- 15:16:48planning skills.
- 15:16:50Congratulations on embarking on this
- 15:16:52exciting journey and good luck.
- 15:16:59[Music]
- 15:17:04After watching this video, you'll be
- 15:17:07able to define the agile philosophy,
- 15:17:09describe the characteristics of agile,
- 15:17:11and explain the philosophy of the agile
- 15:17:13manifesto.
- 15:17:15So, what is agile? Agile is an iterative
- 15:17:19approach to project management that
- 15:17:21allows teams to be responsive and
- 15:17:23deliver value to their customers
- 15:17:24quickly. Notice I said iterative. Unlike
- 15:17:28other planning approaches where we plan
- 15:17:29out an entire year's worth of work, with
- 15:17:32agile, we plan out small increments and
- 15:17:35then get feedback from the customer to
- 15:17:37see if they like what we're doing and
- 15:17:38then we adjust as we go along.
- 15:17:41So what are some defining
- 15:17:43characteristics? Well, agile emphasizes
- 15:17:46this adaptive planning. As I said, we
- 15:17:48don't plan out an entire year. We just
- 15:17:50plan out a small iteration to see if we
- 15:17:54can deliver something of value to the
- 15:17:55customer and get feedback and see what
- 15:17:57they like. That allows us to do
- 15:18:00evolutionary development. So, our
- 15:18:02development is evolving over time. We're
- 15:18:05building instead of building the whole
- 15:18:06thing up at once, we're building it in
- 15:18:08small increments and then we evolve as
- 15:18:10we go and respond as we go. This gives
- 15:18:13us the opportunity to do early delivery.
- 15:18:16very key. If you're developing
- 15:18:18iterations and you're not delivering to
- 15:18:20your customer, you're not being agile.
- 15:18:22Early delivery is a key component of
- 15:18:24being agile. Putting something in the
- 15:18:26customer's hands, getting feedback from
- 15:18:28them to understand, do they like it?
- 15:18:30Should we pivot? Should we persevere?
- 15:18:32This is really, really a critical
- 15:18:34defining characteristic of being agile
- 15:18:36over just doing iterative development.
- 15:18:39That leads us to continuous improvement.
- 15:18:41So now we can continuously improve as a
- 15:18:44team. We continuously improve the
- 15:18:45product that we're delivering, right?
- 15:18:47Because we have the opportunity to get
- 15:18:49feedback from our customer because we
- 15:18:51delivered it and that allows us to be
- 15:18:54responsive to change. So as changes
- 15:18:56happen and changes always do, customers
- 15:18:58always have changing requirements. We
- 15:19:00can respond to those changes because we
- 15:19:02haven't planned too far in advance. The
- 15:19:04customer sees the progress we've made
- 15:19:05and then we can replan very very quickly
- 15:19:08and be responsive to what a customer
- 15:19:10needs.
- 15:19:12This brings us to the agile manifesto.
- 15:19:15The agile manifesto says, "We have come
- 15:19:17to value individuals and interactions
- 15:19:19over process and tools, working software
- 15:19:22over comprehensive documentation,
- 15:19:25customer collaboration over contract
- 15:19:27negotiation, and responding to change
- 15:19:30over following a plan. This is the
- 15:19:32important part that is while there's
- 15:19:35value in the items on the right, we
- 15:19:37value the items on the left more. It
- 15:19:39doesn't mean that we don't have process
- 15:19:41and tools. It just means that we value
- 15:19:43interacting amongst ourselves and with
- 15:19:46our customers more than the process and
- 15:19:48tools. It doesn't mean we don't
- 15:19:49document. Documentation's important so
- 15:19:52that people understand how to use your
- 15:19:54product. But we can't ship
- 15:19:55documentation. So let's not lose the
- 15:19:58focus. Working software is what we're
- 15:20:00here to deliver. It doesn't mean that we
- 15:20:02don't negotiate contracts. We still have
- 15:20:04contracts, but we want to collaborate
- 15:20:06with the customer. As things change, we
- 15:20:08want to be responsive, which means we
- 15:20:11not that we don't have plans, but we
- 15:20:14value responding to change over simply
- 15:20:16following the plan.
- 15:20:19Agile software development then is an
- 15:20:21iterative approach to software
- 15:20:22development that conforms to the agile
- 15:20:25manifesto. We want to make sure that
- 15:20:27we're keeping those four things in the
- 15:20:28manifesto, you know, on our minds a
- 15:20:31whole time. We also want to make sure
- 15:20:33that we emphasize flexibility,
- 15:20:36interacting with our peers, interacting
- 15:20:38with our customer, and having a high
- 15:20:40level of transparency so that everybody
- 15:20:42knows what everyone else is working on.
- 15:20:44Everybody feels responsible for
- 15:20:46delivering value to the customers. This
- 15:20:47is critically important. And then
- 15:20:49finally, we use small, colllocated,
- 15:20:52cross-functional, self-organizing,
- 15:20:55self-managing teams. We're going to talk
- 15:20:56a lot about this during this course.
- 15:21:00The key takeaway here is to build what
- 15:21:03is needed, not what was planned. If you
- 15:21:06build what was planned and the customer
- 15:21:08doesn't like it, why did you bother
- 15:21:10building it? It's really, really
- 15:21:11important to make sure that as needs
- 15:21:13change, and they will, you want to build
- 15:21:16what's needed from the customer
- 15:21:17regardless of what was planned, we could
- 15:21:19always replan and be responsive to
- 15:21:21change. In this video, you learn that
- 15:21:24agile is an iterative collaborative
- 15:21:26approach to software development using
- 15:21:28small cross- functional teams. The agile
- 15:21:31approach emphasizes flexibility,
- 15:21:33interactivity, and transparency. The
- 15:21:36agile manifesto describes the core
- 15:21:38values of agile. Individuals in
- 15:21:41interaction over process and tools,
- 15:21:43working software over comprehensive
- 15:21:44documentation, customer collaboration
- 15:21:47over contract negotiation, and
- 15:21:49responding to change over following a
- 15:21:51plan.
- 15:21:57[Music]
- 15:22:03After watching this video, you'll be
- 15:22:05able to describe the waterfall approach
- 15:22:07to software development, explain the
- 15:22:09problems with the waterfall approach,
- 15:22:11describe extreme programming approach,
- 15:22:14list the values of XP approach, and
- 15:22:17define conbon and list its core
- 15:22:19principles.
- 15:22:21So, let's take a look at traditional
- 15:22:22waterfall development. It all starts out
- 15:22:24with a requirements phase. people are
- 15:22:27gathering requirements, seeing what the
- 15:22:29customer wants, making sure that we're
- 15:22:30going to deliver something that the
- 15:22:31customer wants, at least for that point
- 15:22:33in time. And so this is a phase where
- 15:22:36all you're doing is documenting all the
- 15:22:39requirements that the customer might
- 15:22:40want in the system. Then you move on to
- 15:22:43the design phase. Notice I'm using the
- 15:22:46term phases here. This is very important
- 15:22:48because there was exit criteria and
- 15:22:51entrance criteria to move from one phase
- 15:22:53to the other. So once we've got all the
- 15:22:55requirements, we move on to the design
- 15:22:58hoping that we have all of the
- 15:23:00requirements that we actually need. So
- 15:23:02then in the design phase, the architects
- 15:23:04are designing. They're figuring out how
- 15:23:06do we take those requirements, turn them
- 15:23:08into working software. Uh and so they
- 15:23:10design the entire system. And then once
- 15:23:13that phase is done, we move on to the
- 15:23:15coding phase. So this is where the
- 15:23:16developers are hacky hack coding away.
- 15:23:19Now you'll notice this is called
- 15:23:21waterfall. and those arrows are flowing
- 15:23:23down because it's really hard to swim up
- 15:23:27a waterfall. So, this is an appropriate
- 15:23:29name because when you're in the coding
- 15:23:31phase and you find out this is a bad
- 15:23:33design, it doesn't work. It's real hard
- 15:23:36to go back up and redesign things. In
- 15:23:39fact, because we treat software
- 15:23:40development like civil engineering
- 15:23:42projects, sometimes some of those
- 15:23:44designers have moved on to the next
- 15:23:45project and you've got to go find them.
- 15:23:48So, very very difficult to go back and
- 15:23:50swim up the waterfall. Then after
- 15:23:52coding, we finally get to integrate. So
- 15:23:55all along we're coding in isolation.
- 15:23:57We're not integrating my module with the
- 15:23:59next person's module. You know, there's
- 15:24:01a time when all those modules come
- 15:24:02together. The first time we realize, do
- 15:24:04all these pieces of code even work
- 15:24:06together? And then we move on to the
- 15:24:08testing phase because now we've got a
- 15:24:10system that people can test. And as they
- 15:24:13find bugs, you got to go back, swim up
- 15:24:15the waterfall, and open some bugs in the
- 15:24:18coding phase and do some recoding. And
- 15:24:19then if one of those bugs that they
- 15:24:21tested uh turns out to be you really
- 15:24:23need to change the design because these
- 15:24:25things aren't interacting well way way
- 15:24:28up the waterfall very expensive to go
- 15:24:30back up to the design phase. And then
- 15:24:32finally after all the testing is done we
- 15:24:35deploy the software. So what's wrong
- 15:24:38with this approach? Well there's no
- 15:24:40provision for change. Every phase has
- 15:24:43entrance and exit criteria and when one
- 15:24:45ends you know the next one begins and
- 15:24:47there's just no provision for going back
- 15:24:49and changing the design or changing the
- 15:24:51requirements or anything like that. So
- 15:24:53the other problem is you don't know if
- 15:24:54it works to the end right there's no
- 15:24:56intermediate delivery. Nothing is
- 15:24:58delivered until that last step when we
- 15:25:01give it to the operations team and say
- 15:25:03go deliver this thing into production.
- 15:25:06The other is that each step ends when
- 15:25:08the next one begins. That's where it got
- 15:25:10this waterfall name where things are
- 15:25:12just passed down. And of course, every
- 15:25:14one of these is an opportunity to lose
- 15:25:16information uh you know and to to have a
- 15:25:18mishap happen or to have people get uh
- 15:25:21blocked because they can't accept you
- 15:25:23know the work from the previous phase
- 15:25:25and now you're waiting uh to get that
- 15:25:26next phase going. The other is that
- 15:25:29mistakes that are found later on are
- 15:25:31very very costly. Very costly to find
- 15:25:34something that's designed wrong in
- 15:25:35testing and go back and redesign it. And
- 15:25:38then finally, there's usually long lead
- 15:25:40times, right, between getting that
- 15:25:42software delivered from the time you
- 15:25:44first ex want the software and you
- 15:25:46design the software and code it and test
- 15:25:48it and by the time you finally deliver
- 15:25:49it, long long long lead times. So the
- 15:25:53problem here is teams are working
- 15:25:55separately. They're unaware of their
- 15:25:56impact to each other, right? The
- 15:25:58designers are unaware of the impact of
- 15:25:59the code. The coders are unaware of
- 15:26:01their impact to integrating all the code
- 15:26:03together. So everybody's working in
- 15:26:04their little silos for their little
- 15:26:06phase. And then this should be a scary
- 15:26:08thought. The people who are furthest
- 15:26:11away from the code, the poor operations
- 15:26:13team have to run this and manage this in
- 15:26:16production, right? They know the least
- 15:26:18about the code and they're the ones who
- 15:26:20are expected to run it. Not very
- 15:26:22efficient. Let's talk about another
- 15:26:24methodology, extreme programming. Uh
- 15:26:27this was introduced back in 96. Kent
- 15:26:29Beck introduced this. And if you look at
- 15:26:32the graphic on the right, you'll see
- 15:26:33that it is very iterative and talking
- 15:26:36about loops. You've got these major
- 15:26:38release plan on the outer loop and then
- 15:26:40you've got an iteration plan. And so the
- 15:26:42release may be months, the iterations
- 15:26:44may be weeks, acceptance test may be
- 15:26:46days, standup meetings once a day,
- 15:26:48right? Pair negotiation in hours, unit
- 15:26:50testing in minutes, pair programming in
- 15:26:52seconds. Uh you know, it's these tighter
- 15:26:54and tighter loops uh of of of doing work
- 15:26:57and then getting fast feedback. It's
- 15:27:00based on an iterative approach to
- 15:27:02software development. Uh and in fact,
- 15:27:04this is where agile got it from. Uh and
- 15:27:07the intent here is to improve software
- 15:27:08quality, right? Be responsive to change,
- 15:27:10be responsive to customer requirements,
- 15:27:12do things in small increments. And so
- 15:27:15many people recognize extreme
- 15:27:16programming as one of the first agile
- 15:27:19methods.
- 15:27:20So let's talk about extreme programming
- 15:27:22values. First is simplicity, right? Do
- 15:27:25what you need and no more. Don't
- 15:27:27overengineer. Don't overcode. Don't
- 15:27:30deliver more code than the customer
- 15:27:32asked for. Keep it simple. Very
- 15:27:33important. The next one is
- 15:27:35communication. Everyone on the team
- 15:27:37should be communicating. Knowing what
- 15:27:39everyone else is doing. It fosters a lot
- 15:27:41a lot of communication and people
- 15:27:43interacting. Very important as well. And
- 15:27:45then feedback. You have no idea how
- 15:27:47you're doing unless you're getting
- 15:27:48feedback. So having those feedback loops
- 15:27:51are critical to extreme programming and
- 15:27:53critical to agile in general. And then
- 15:27:56respect. Everyone feels that they are
- 15:27:58respected on the team, that they can
- 15:28:00offer advice, that they can make
- 15:28:01suggestions, uh, and that their
- 15:28:03suggestions are just as valuable as
- 15:28:05anybody else's suggestion on the team.
- 15:28:07There's no hierarchy. Everybody is peers
- 15:28:09on the team and respected for their
- 15:28:11ideas. And then finally, courage, right?
- 15:28:14We don't pad our estimates. We're just
- 15:28:16very honest about we think we could do
- 15:28:18this and we don't think we can do that.
- 15:28:19And we're not going to lie to you that
- 15:28:21we, you know, we can get this this done
- 15:28:22in this amount of time. We're very open
- 15:28:24and honest and extreme programming on
- 15:28:26these are the estimates. This is what
- 15:28:28we'll commit to. Next, there's conbon.
- 15:28:31This comes from the Japanese
- 15:28:32manufacturing systems. Uh and conbon
- 15:28:35literally means billboard sign and it's
- 15:28:37all about continuous flow on the
- 15:28:39manufacturing floor where these cards or
- 15:28:41notes would flow with the product from
- 15:28:44station to station uh going down the
- 15:28:46line. So the core principle of a conbon
- 15:28:49are visualize the workflow. If you can't
- 15:28:52see the work, you can't manage the work.
- 15:28:54And this is something we take into agile
- 15:28:56too. You you're going to find out we're
- 15:28:57going to use conbon boards in agile. And
- 15:28:59it's all about visualizing the work.
- 15:29:01Very very important that you could
- 15:29:03understand the work that needs to be
- 15:29:04done and everything is accounted for.
- 15:29:07Conbon also stresses limit the work in
- 15:29:10progress. You don't want and you're on a
- 15:29:12manufacturing floor, you don't want work
- 15:29:14to back up at one of the stations. But
- 15:29:16even when you're developing software,
- 15:29:17you don't want to have people working on
- 15:29:19too many things at once because, you
- 15:29:21know, you can only ship 100% of one
- 15:29:23thing that's working. You can't ship 50%
- 15:29:25of two things. And so, if you got one
- 15:29:27person working on two things, it's not
- 15:29:28good. And that comes from conbon to
- 15:29:30limit the work in progress. Then there's
- 15:29:33managing and enhancing the flow. In
- 15:29:35conbon, they're always looking to
- 15:29:37improve. They're always looking to
- 15:29:38change and understand how can we get a
- 15:29:40better flow, a quicker flow uh on the
- 15:29:43manufacturing floor. and then making
- 15:29:45policies explicit so that everyone
- 15:29:48understand how things work and everyone
- 15:29:50understands a definition of done. What
- 15:29:52does it mean to have something be done?
- 15:29:55We take that also from conbon in our
- 15:29:57agile um planning to understand what the
- 15:30:00definition of done is and then
- 15:30:02continuously improving very very
- 15:30:04important to get feedback and
- 15:30:06continuously improve on what you're
- 15:30:07doing. So conbon is all about uh making
- 15:30:10the flows work better, understanding
- 15:30:12them, seeing them, being able to measure
- 15:30:14them, and then continuously improving on
- 15:30:17how we can flow faster. In this video,
- 15:30:20you learn that the traditional waterfall
- 15:30:22approach to software development is a
- 15:30:23structured step-by-step process that can
- 15:30:26lead to problems not surface until later
- 15:30:28in development.
- 15:30:30The extreme programming was developed to
- 15:30:32improve software quality and
- 15:30:33responsiveness to changing requirements.
- 15:30:36XP values include simplicity,
- 15:30:38communication, feedback, respect, and
- 15:30:41courage. Conbon is a system
- 15:30:43characterized by visualizing workflow,
- 15:30:46limiting work in progress, managing and
- 15:30:48enhancing the flow, making process
- 15:30:50policies explicit, and continuously
- 15:30:52improving a process.
- 15:30:59[Music]
- 15:31:05After watching this video, you'll be
- 15:31:07able to list the five practices of
- 15:31:08working agile, explain working in small
- 15:31:11batches, define a minimum viable
- 15:31:13product, understand behavior-driven
- 15:31:15development, understand test-driven
- 15:31:17development, explain how pair
- 15:31:19programming works.
- 15:31:22So, let's take a look at what it really
- 15:31:24means to work in an agile fashion.
- 15:31:27First, you want to work in small
- 15:31:29batches. We get this from uh lean
- 15:31:32manufacturing. You don't want to make a
- 15:31:33big batch of something and then find out
- 15:31:35that you did it wrong because that's a
- 15:31:36lot of waste having to go back and
- 15:31:38change it. Next, you want to use minimum
- 15:31:41viable products to figure out what does
- 15:31:44the customer like, what doesn't the
- 15:31:45customer like. And then you want to use
- 15:31:48practices like behavior-driven
- 15:31:49development and test-driven development
- 15:31:52to improve your testing of the system
- 15:31:54from the outside in and from the inside
- 15:31:57out. And then finally, you want to take
- 15:31:59advantage of pair programming. This came
- 15:32:01from extreme programming, but pair ch
- 15:32:03program chroming is critically
- 15:32:04important. And so we're going to look at
- 15:32:06each one of these in turn
- 15:32:10working in small batches. Let's say I
- 15:32:12need to mail out a thousand brochures.
- 15:32:15And the steps are you need to fold the
- 15:32:17brochures and then insert the brochures
- 15:32:19into envelopes and then seal the
- 15:32:21envelopes and then finally stamp the
- 15:32:23envelopes with postage. So let's say
- 15:32:25that we're going to do these thousand in
- 15:32:27batches of 50, right? Big batches, 50 a
- 15:32:30piece. and assume that each step takes
- 15:32:32about six seconds to complete. So I can
- 15:32:33do about 10 steps per minute. Uh and so
- 15:32:36we do the first step folding, right? And
- 15:32:38at 10 per minute, it takes me about 5
- 15:32:40minutes to fold 50 of them. Then I move
- 15:32:44on to the next step. The next step is
- 15:32:46inserting them all. And again, it I
- 15:32:48could do about 10 of them per minute.
- 15:32:50And so it takes me five more minutes
- 15:32:52plus the five minutes from before. Now
- 15:32:54I'm 10 minutes into it. I've got them
- 15:32:56all folded and inserted. Then I move on
- 15:32:58to step three, sealing them all. Right?
- 15:33:00So now again about 10 per minute. I
- 15:33:02could do another uh 50 and another five
- 15:33:05minutes. So I'm up to 15 minutes, right?
- 15:33:08Wall clock time. And then finally, I get
- 15:33:10to step four and it took me 16 minutes
- 15:33:14to get my first finished product, right?
- 15:33:16The first one where I I had things that
- 15:33:18I could actually inspect it and see what
- 15:33:20the quality was. So what if the
- 15:33:22envelopes had no glue, right? it would
- 15:33:25be 11 minutes before I I figure out that
- 15:33:28something went wrong. What if there's a
- 15:33:30typo on the brochure? I have to go all
- 15:33:31the way back uh to to the beginning,
- 15:33:33right? Um so this is just very very
- 15:33:36wasteful working in these large batches
- 15:33:38like this now. Let's look at the same
- 15:33:40example with single piece flow. And
- 15:33:42again, assume each step takes about 6
- 15:33:44seconds to complete. With single piece
- 15:33:46flow, I fold right and put them in the
- 15:33:49envelope and seal them, put a stamp on
- 15:33:50them, and the first finished product is
- 15:33:52in about 24 seconds. Now, I can inspect
- 15:33:55it, see if it works, uh see if it's what
- 15:33:58I thought it was, and then let the rest
- 15:34:00of the flow rip. Now, what if the
- 15:34:02envelopes had no glue? Well, I would
- 15:34:04find out after uh maybe 18 seconds,
- 15:34:07right? And if there was a typo on the
- 15:34:08brchure, after 24 seconds. So, it's
- 15:34:11very, very important that we don't work
- 15:34:13in too large a batches. so that we can
- 15:34:15get fast feedback and that we can pivot
- 15:34:17and understand you know do we need to do
- 15:34:19something different and then make the
- 15:34:21changes that we need to make. So let's
- 15:34:24talk about minimum viable product. First
- 15:34:27let's understand what it is not because
- 15:34:29there's a misconception that a minimum
- 15:34:30viable product is like phase one of the
- 15:34:33project or you know the first beta or
- 15:34:35something like that and it's not. This
- 15:34:37is not what a minimum viable product is.
- 15:34:40A minimum viable product is the minimal
- 15:34:42thing that you can do to prove a
- 15:34:44hypothesis and gain learning and gain
- 15:34:46understanding. The difference between
- 15:34:48these two is that the first one is all
- 15:34:51about delivery, right? What am I going
- 15:34:52to deliver? But the second one is all
- 15:34:54about learning. What can I learn? What
- 15:34:57can I learn from putting out this MVP
- 15:35:00and and and get feedback and then maybe
- 15:35:02make the next one even better. So, it's
- 15:35:05important that at the end of each MVP,
- 15:35:08you decide whether to pivot or
- 15:35:09persevere.
- 15:35:12Let's look at an example. Here's a team
- 15:35:14that's developing a minimum viable
- 15:35:16product for a customer that wants a car.
- 15:35:19And so, in the first iteration, they
- 15:35:20deliver a wheel. The customer's like,
- 15:35:22"What am I going to do with a wheel? I
- 15:35:24can't do anything with this." Like,
- 15:35:25well, we're working iterations. We're
- 15:35:26trying to be agile here, right? And so,
- 15:35:28the next iteration, we'll give you some
- 15:35:30more. And they give them a chassis. And
- 15:35:31it's like, okay, I really can't do
- 15:35:34anything with this. And then finally,
- 15:35:35you know, they give them a car with no
- 15:35:37steering wheel. And and then eventually
- 15:35:40they get the car, right? And so they get
- 15:35:42this this coupe.
- 15:35:44That team did not understand how to
- 15:35:46create a minimum viable product. They
- 15:35:48were just doing iterative development.
- 15:35:50The second team understands the value of
- 15:35:52creating an MVP. At first, they give
- 15:35:56them a skateboard and the customer's
- 15:35:58like, "I asked you for a car and you're
- 15:36:00giving me a skateboard." Like, whoa,
- 15:36:01whoa. We're testing the color. How do
- 15:36:04you like that color red? Is that the
- 15:36:05color you want? Oh, yeah. Red's kind of
- 15:36:07cool, but you know, it's really hard to
- 15:36:09steer. We'll fix that in the next MVP.
- 15:36:13And then they add a way to steer it. And
- 15:36:15the customer's like, well, okay, you did
- 15:36:17give me a way to steer it, but I can't
- 15:36:18go very fast. I need a better form of
- 15:36:20locomotion. And then we'll deal with
- 15:36:22that in the next MVP. In the next
- 15:36:24iteration, they give them pedals.
- 15:36:26Somewhere along the way, while the
- 15:36:28customer is riding on that motorcycle,
- 15:36:30feeling the wind in their hair, they
- 15:36:32decide, "I want a convertible."
- 15:36:36In the first instance, the customer got
- 15:36:38exactly what they asked for months
- 15:36:40before cuz they were just following a
- 15:36:41plan. But in the second instance, the
- 15:36:44customer got exactly what they desired
- 15:36:47because they were working interactively
- 15:36:49with the development team. And in the
- 15:36:52end, you develop something that's a
- 15:36:53little bit different, but it's closer to
- 15:36:55what the customer really, really wants.
- 15:36:59Behavior driven development is when we
- 15:37:01describe the system from the outside in.
- 15:37:04This is usually done at an integration
- 15:37:07testing level, right? So, this is where
- 15:37:09we're taking the customer's view of the
- 15:37:11system. Usually, when you're doing BDD
- 15:37:14testing, you're doing it against the
- 15:37:16user interface, right? you're doing it
- 15:37:17against the thing that the customer sees
- 15:37:19to see if the um system behaves the way
- 15:37:22it's supposed to. So, if it's an
- 15:37:24e-commerce system, when I put something
- 15:37:25in my cart, does it behave the way I
- 15:37:27want? When I transfer a cart to an
- 15:37:28order, does it behave the way I want?
- 15:37:30It's really taking an outside in
- 15:37:32approach, it's not too concerned with
- 15:37:34the things going on underneath.
- 15:37:36The cool thing is it uses a single
- 15:37:38syntax that both the developers and the
- 15:37:41stakeholders can use to describe the
- 15:37:43system and agree on the behavior of the
- 15:37:46system on what the system does. So let's
- 15:37:48take a look at that syntax. It starts
- 15:37:51with these BDD feature scenarios where I
- 15:37:54say as a some role. So I want to know
- 15:37:57who is this for. I need some function
- 15:38:00right? So what is it the functionality
- 15:38:02that we actually need so that I get some
- 15:38:05business value. So now you know who is
- 15:38:08it for? Is it for the customers? Is it
- 15:38:09for the system administrator? Right?
- 15:38:11Who's getting the the value out of this?
- 15:38:13What is it they need and why do they
- 15:38:15need it? And that's the beginning of
- 15:38:17your feature file. And then you start
- 15:38:19running through scenarios. And here's
- 15:38:22where we use this common syntax. It's
- 15:38:24known as Girkin syntax after the Girkin
- 15:38:26pickle. Um and it goes something like
- 15:38:29this. given a set of preconditions.
- 15:38:32Right? So that kind of sets up the
- 15:38:33scenario. Given that this is true, I've
- 15:38:36got two items in my cart. I got three
- 15:38:37items in my order, whatever. When some
- 15:38:40event happens, right? So that's the
- 15:38:42thing that's under test, then I should
- 15:38:45see some observable outcome. So using
- 15:38:48this given when then syntax developers
- 15:38:51can understand it, stakeholders can
- 15:38:53understand it, everybody can understand
- 15:38:54this common syntax that when I have
- 15:38:57something in my cart and then I clear my
- 15:39:00cart, you know, I should see nothing in
- 15:39:02my cart. So so very very important to
- 15:39:04have the syntax in these BDD scenarios.
- 15:39:09Test driven development is testing the
- 15:39:12system from the inside out. Unlike
- 15:39:14behavior-driven development, it is
- 15:39:16concerned with the internals of the
- 15:39:18system, the single modules. Usually,
- 15:39:20this is called unit testing, right? And
- 15:39:22this is something that is unit test case
- 15:39:24driven. And we want to make sure that
- 15:39:26given these inputs, I get these outputs
- 15:39:28at a small module level. I don't know if
- 15:39:30when I put them all together, I'm going
- 15:39:32to get the behavior I want. That's kind
- 15:39:33of BDD. But for TDD, test-driven
- 15:39:35development, I'm just testing the system
- 15:39:38way down at the unit level. And so you
- 15:39:40write a test case first for the code you
- 15:39:42wish you had and then you write enough
- 15:39:44code to make that test case pass and
- 15:39:46then you start all over again and and
- 15:39:48and refactor. So the workflow goes
- 15:39:50something like this. I write a test
- 15:39:52case. You might say you write test cases
- 15:39:54before you write the code. Yeah, this
- 15:39:56keeps me f uh featured on what is the
- 15:39:59code supposed to do when I call this?
- 15:40:01How do I want to call this? What are the
- 15:40:02parameters I think I want to pass in?
- 15:40:04And then what does it do for me? So you
- 15:40:06write the test case first. Then you
- 15:40:08write enough code to make that test case
- 15:40:10pass. And then once it passes, then you
- 15:40:13can refactor the code because now you
- 15:40:15have test cases to keep you honest.
- 15:40:17You'll know if you broke anything. Now,
- 15:40:19because when the test case runs and it
- 15:40:21fails, it usually turns red. And then
- 15:40:24when it works correctly, it turns green.
- 15:40:26We tend to call this red green refactor.
- 15:40:29Watch a test, write a test case, watch
- 15:40:31it fail, make just write enough code to
- 15:40:33make it pass, and then refactor. Make
- 15:40:36it. You might not have made it very
- 15:40:37elegant just to make it pass. Now you
- 15:40:39can go back and you can add all sorts of
- 15:40:40error checking and whatnot. Make it a
- 15:40:42little more uh robust and then run the
- 15:40:44test cases. Make sure you didn't break
- 15:40:46anything.
- 15:40:48Pair programming. Pair programming. You
- 15:40:51might say two programmers working
- 15:40:53together on the same thing. Uh and the
- 15:40:56first thing is I'm paying two people to
- 15:40:58do one job. But actually it works out
- 15:41:01really really well because what you're
- 15:41:03doing is you've got one person writing
- 15:41:05code and then you've got another person
- 15:41:07who is another set of eyes on the code.
- 15:41:09So the question is would you rather find
- 15:41:11bugs in production? Would you rather
- 15:41:13find bugs while you're writing the code?
- 15:41:14It's a lot cheaper to find them while
- 15:41:16you're writing the code. So having two
- 15:41:18sets of eyes they check each other and
- 15:41:20they go back and forth. It's not just
- 15:41:22one and then the other. Usually in 20
- 15:41:23minute increments, right? Somebody's
- 15:41:25writing code, the other one is watching.
- 15:41:27And they're not just watching. Sometimes
- 15:41:28they're looking things up. Sometimes
- 15:41:30they're discussing what do you think I
- 15:41:31should call this variable? What do you
- 15:41:33think I should call this function?
- 15:41:34Right? It's two sets of minds working
- 15:41:37around this code. And what happens is
- 15:41:39you actually get higher quality code at
- 15:41:41the end of the day. Right? The code
- 15:41:43quality goes up because two people have
- 15:41:45already checked it. And so when you say
- 15:41:47I can't afford to pay two people to
- 15:41:49write one piece of code, you can't
- 15:41:51afford not to pay two people to write it
- 15:41:53because writing the code is the cheap
- 15:41:54part. debugging it and maintaining in
- 15:41:56production. That's the expensive part.
- 15:41:58And so if you want the expensive part to
- 15:42:00get cheaper, you want to have your
- 15:42:02programmers do pair programming. It's
- 15:42:04also very good to put a senior
- 15:42:05programmer with a junior programmer. Now
- 15:42:07the junior programmers can see how does
- 15:42:09the senior programmer approach the
- 15:42:11problem and so they learn they get
- 15:42:12mentorship and then the senior program
- 15:42:14can see how the junior person is making
- 15:42:16out or you get people who are unfamiliar
- 15:42:19with the code working with someone who
- 15:42:20is now you get more people learning the
- 15:42:22code because they they're and they're
- 15:42:24getting like a tutorial from the other
- 15:42:26person. So pair programming is really
- 15:42:28really great way of bringing all your
- 15:42:30people on your team up to a certain
- 15:42:32level. In this video, you learn that
- 15:42:36working in small batches means
- 15:42:37delivering something useful quickly. An
- 15:42:40MVP is the cheapest, easiest thing you
- 15:42:42can do to test a hypothesis and learn.
- 15:42:45Behavior-driven development makes sure
- 15:42:47you are building the right thing. And
- 15:42:49test-driven development makes sure
- 15:42:51you're building the thing right. While
- 15:42:53pair programming enables you to discover
- 15:42:55defects earlier and increase your code
- 15:42:58quality.
- 15:42:59[Music]
- 15:43:11After watching this video, you'll be
- 15:43:14able to distinguish between agile and
- 15:43:15scrum, define the key characteristics of
- 15:43:18the scrum methodology, and describe the
- 15:43:20steps in the scrum process.
- 15:43:23Agile and scrum are two words that many
- 15:43:26people use interchangeably, but there
- 15:43:28really is a difference. Agile is a
- 15:43:30philosophy. It is not prescriptive. It's
- 15:43:33a philosophy for doing work. Scrum is a
- 15:43:36methodology. It is prescriptive. It's a
- 15:43:39methodology for working in an agile
- 15:43:41fashion.
- 15:43:43So what is scrum? Well, it's a
- 15:43:45management framework for doing
- 15:43:47incremental product development. It
- 15:43:50emphasizes small cross-functional
- 15:43:52self-managing teams and it provides a
- 15:43:56structure of roles and rules and
- 15:43:58artifacts and we're going to learn about
- 15:44:00all of those.
- 15:44:02It also uses these fixed length
- 15:44:04increments that are called sprints.
- 15:44:06We're going to get into sprints in a
- 15:44:07moment. And it has a goal of building an
- 15:44:11increment each time through a sprint, a
- 15:44:14potentially shippable increment each
- 15:44:16time through that iteration. very very
- 15:44:19important that you get stuff in your
- 15:44:21customers hands early.
- 15:44:24So I like to say easy to understand,
- 15:44:28difficult to master. There's not a lot
- 15:44:30of rules in scrum, but somehow it's
- 15:44:33really, really hard to do. And I
- 15:44:34attribute it to being a barrel arena.
- 15:44:36Like all you have to do is dance on your
- 15:44:38toes, right? How hard could it be? Well,
- 15:44:41we all know it takes years to gain the
- 15:44:44muscle uh memory and and build up your
- 15:44:47muscles to be able to dance on your
- 15:44:49toes. It's not as easy as it looks. And
- 15:44:52scrum is the same way. Not as easy as it
- 15:44:54looks. So, my advice is if you've never
- 15:44:57done it before, hire somebody on the
- 15:44:59team who has. Have some to guide you,
- 15:45:02someone to mentor you, because it is a
- 15:45:04lot harder than it looks.
- 15:45:07So, let's talk about the sprint. A
- 15:45:09sprint is one iteration through the
- 15:45:12design, code, test, deploy cycle, right?
- 15:45:15So you're doing these many iterations.
- 15:45:16It's kind of like the software delivery
- 15:45:18life cycle in a in a MIDI in iteration.
- 15:45:22Uh every sprint should have a goal,
- 15:45:24right? You everybody should understand
- 15:45:26what is it we're trying to build with
- 15:45:27this increment. What should this
- 15:45:29increment do at the end of the sprint?
- 15:45:32And then the sprints are usually two
- 15:45:33weeks long. Some people say two to four
- 15:45:35weeks. I find four weeks to be far too
- 15:45:38long. A lot of things can change in four
- 15:45:40weeks, right? Remember, small, you want
- 15:45:42to work in small batches. Uh, and so I
- 15:45:44think it's really important to try to
- 15:45:45keep your sprints at two weeks. Some
- 15:45:47people get them down to one. That's a
- 15:45:49little too fast for me, but two weeks
- 15:45:50seems to be a good goal uh to make your
- 15:45:53sprints.
- 15:45:54So, let's look at the steps in the Scrum
- 15:45:56process. You've got the product backlog.
- 15:45:59This is the list of all the stories of
- 15:46:02everything you ever want to do with your
- 15:46:04product. This is it. This is everything.
- 15:46:06It's kind of your to-do list of
- 15:46:07everything you might want to do. Then
- 15:46:10we've got something called backlog
- 15:46:12refinement. That's when we go through
- 15:46:13the product backlog and we groom the
- 15:46:15stories to make sure that they're sprint
- 15:46:17ready because we want to start doing
- 15:46:19planning on those stories. Then we have
- 15:46:22a planning meeting where we produce a
- 15:46:24sprint backlog. Notice the sprint
- 15:46:26backlog is smaller than the product
- 15:46:28backlog. The sprint backlog is just
- 15:46:31those stories that we want to accomplish
- 15:46:33in the next sprint in the next two
- 15:46:35weeks. So we take from that product
- 15:46:37backlog, pair it down into a sprint
- 15:46:40backlog of just the stories to execute
- 15:46:42in the next sprint. And then we start
- 15:46:45our twoe sprints and every day we get
- 15:46:47together and do the daily scrum or the
- 15:46:50daily standup where everybody gets to
- 15:46:52answer three questions. What did you do
- 15:46:54yesterday? What are you going to do
- 15:46:55today? and is there anything blocking
- 15:46:57you or impeding you from getting uh
- 15:46:59further? Uh so you go through that every
- 15:47:01day for two weeks, build your sprint and
- 15:47:04then finally hopefully you've got a
- 15:47:06valuable shippable increment at the end
- 15:47:08of that process.
- 15:47:10Agile development is iterative. You're
- 15:47:13going to go through this again and
- 15:47:15again. Design, code, test, deploy.
- 15:47:17Design, code, test, deploy. I mean this
- 15:47:19is this is what you do in every sprint.
- 15:47:22And notice, you know, you've got to have
- 15:47:24some kind of deploy. It's not enough to
- 15:47:26just do design code and test design code
- 15:47:28and without deploying it and getting
- 15:47:30feedback, right? So, so every sprint you
- 15:47:33make a plan, you go through the software
- 15:47:35delivery life cycle cycle and then you
- 15:47:38deploy that application and you get some
- 15:47:40feedback from the customer that is input
- 15:47:42to the next plan to go through the next
- 15:47:45cycle.
- 15:47:47In this video, you learn that scrum is a
- 15:47:49methodology that follows the agile
- 15:47:51philosophy. The scrum management
- 15:47:53framework provides structure through
- 15:47:55defined roles, meetings, rules, and
- 15:47:58artifacts. It also prescribes small
- 15:48:01cross- functional self-organizing teams,
- 15:48:04uses fixed length iterations called
- 15:48:06sprints, and produces a potentially
- 15:48:08shippable product increment with every
- 15:48:10iteration.
- 15:48:12[Music]
- 15:48:23After watching this video, you'll be
- 15:48:25able to list the three roles of scrum,
- 15:48:27explain what a product owner does,
- 15:48:29explain what a scrum master does, and
- 15:48:31explain what a scrum team does. There
- 15:48:34are only three roles in scrum. It starts
- 15:48:37with the product owner. That's the
- 15:48:39person who has the vision. That's the
- 15:48:40person who calls the shots. They're the
- 15:48:42one who decides to pivot or persevere.
- 15:48:45Often I get asked the question, what's
- 15:48:47the difference between a product manager
- 15:48:48and a product owner? It's pretty simple.
- 15:48:51A product manager is a job title. A
- 15:48:54product owner is a scrum role. Your
- 15:48:56product manager might be your product
- 15:48:57owner, might not be your product owner.
- 15:48:59Don't get them confused. This is a role
- 15:49:02in scrum.
- 15:49:04Then there's the scrum master. We want
- 15:49:07them to be mentors, right? We want them
- 15:49:10to be the smartest person about scrum on
- 15:49:12the team to help the rest of the team
- 15:49:14implement scrum. So that is somebody
- 15:49:16that you want to be guiding the team. If
- 15:49:18you don't have an experienced scrum
- 15:49:19master, get one because that can make or
- 15:49:22break a team. If you've got experienced
- 15:49:24teams, maybe they don't need an
- 15:49:25experienced scrum master. But if you've
- 15:49:27got a team just starting out in scrum, I
- 15:49:30recommend the scrum master be
- 15:49:31experienced. And then there's a scrum
- 15:49:33team or sometimes called the development
- 15:49:35team. Not to be confused with a team of
- 15:49:37software engineers. The development team
- 15:49:39are the people who are developing
- 15:49:41whatever it is you're delivering. They
- 15:49:42could be software engineers, testers,
- 15:49:44operations folks, uh business analysts,
- 15:49:47whoever it is that's part of the team
- 15:49:49that's delivering the product increment.
- 15:49:51So, let's dig deeper into each one of
- 15:49:53these roles to see what they do. The
- 15:49:56product owner, they represent the
- 15:49:58stakeholder interests. If there's any
- 15:50:00questions about what the stakeholders
- 15:50:02want, you should go to the product
- 15:50:04owner. You don't need to go to the
- 15:50:05stakeholder. who is a stakeholder. It's
- 15:50:07usually the person with the checkbook.
- 15:50:09It's the person who is funding whatever
- 15:50:10it is that you're doing, right? They're
- 15:50:12the one at the end of the day that are
- 15:50:14paying you to do it. Um, but this
- 15:50:16product owner is the liaison between the
- 15:50:18the scrum team and the stakeholders and
- 15:50:21their interests. They also articulate
- 15:50:23the product vision. This is very key.
- 15:50:26Product owners have to have a vision of
- 15:50:28where they're going. It really, really
- 15:50:29important. And when and they should
- 15:50:31articulate that vision to the team so
- 15:50:33the whole team knows where they're
- 15:50:35going. They are the final arbiter of
- 15:50:38requirements or questions. You have any
- 15:50:39questions on the requirements don't need
- 15:50:41to go to the stakeholders. You go to the
- 15:50:43product owner. They are the liaison. And
- 15:50:45they constantly rep prioritize the
- 15:50:47product backlog adjusting any
- 15:50:49expectations. And so every time through
- 15:50:52a sprint we go through the product
- 15:50:53backlog. the product owner, maybe the
- 15:50:55scrum master will go through the product
- 15:50:56backlog and they will rep prioritize and
- 15:50:58they will um groom these stories and
- 15:51:01make them give them more detail. Uh so
- 15:51:03that is one of the jobs of the product
- 15:51:05owner making sure that backlog is sprint
- 15:51:07ready. They also accept or reject each
- 15:51:10product increment. So that's the person
- 15:51:11that says, "Yep, let's go with it. Let's
- 15:51:13ship it or no, not quite what the
- 15:51:15customer asked for. Um you know, let's
- 15:51:17try again. We'll write some more stories
- 15:51:18and and try to get it right the next
- 15:51:20time." Uh so they decide whether to
- 15:51:22ship. It's it's their sole
- 15:51:24responsibility. They decide whether to
- 15:51:26continue development. Maybe you you
- 15:51:28don't need to persevere. Maybe you need
- 15:51:29to pivot. Maybe you need to do something
- 15:51:31different. Uh so they would uh make that
- 15:51:33decision as well.
- 15:51:35The scrum master facilitates the scrum
- 15:51:38process. They should be the smartest
- 15:51:39person in the room about scrum. It's
- 15:51:42very important to have an experienced
- 15:51:43scrum master. If you have an
- 15:51:44inexperienced team, if you have a very
- 15:51:46experienced team in scrum, you might not
- 15:51:48need a very experienced scrum master or
- 15:51:50uh you might have a scrum master uh
- 15:51:53between a couple of teams that are
- 15:51:54experienced because they don't need um a
- 15:51:56lot of uh his time. They coach the team.
- 15:52:00We want them to be agile coaches, right?
- 15:52:02We want them to be mentors. We want them
- 15:52:04to help the team through the scrum
- 15:52:06process. They create an environment that
- 15:52:09allows the team to be self-organizing,
- 15:52:11right? So the the team decides what they
- 15:52:13do. They're the ones that are going to
- 15:52:14commit to a uh to a sprint increment and
- 15:52:17the pro and the scrum master has to make
- 15:52:19sure that the team has the ability in
- 15:52:21the environment in which they can do
- 15:52:22that and be self-organizing. They also
- 15:52:24shield the team from external
- 15:52:26interferences, right? Keep them in the
- 15:52:27zone. So if customers are grabbing team
- 15:52:30members or stakeholders or calling team
- 15:52:31members, you know, the scrum master
- 15:52:33needs to stop that. They need to say if
- 15:52:35you need something, you come to me,
- 15:52:36right? Let the team alone. Let them do
- 15:52:38the work they need to do. They also help
- 15:52:41resolve impediments. We're going to find
- 15:52:43that we do a daily standup and the three
- 15:52:45questions we ask during that standup are
- 15:52:47what did you do yesterday? When did you
- 15:52:48get it got done today? And are there any
- 15:52:50impediments? If anyone on the team has
- 15:52:52an impediment, it is the c the scrum
- 15:52:55master's highest priority that day to
- 15:52:56get them unblocked to remove that
- 15:52:58impediment. Very very very important.
- 15:53:00It's very different than traditional
- 15:53:02project management where a project
- 15:53:03manager if you told me you have an
- 15:53:05impediment they'll ask you what are you
- 15:53:06going to do about it? It's not the scrum
- 15:53:07master's job. The scrum master's job is
- 15:53:09to say I will give that impediment to
- 15:53:11me. I will get it fixed. You move on to
- 15:53:13some more productive work.
- 15:53:16They also enforce the sprint time boxes,
- 15:53:18right? So, you've got 15minute um daily
- 15:53:21standup and they make sure it stays at
- 15:53:2315 minutes, right? And all the other
- 15:53:25scrum meetings, they make sure that
- 15:53:26their time box, the twoe spread, make
- 15:53:28sure we don't go over the two weeks
- 15:53:29during the sprint.
- 15:53:31They capture empirical data, maybe
- 15:53:33adjust forecast, right? So, they're the
- 15:53:35one who's making sure looking at
- 15:53:37burndown charts and making sure that the
- 15:53:39team is going to reach their goals. And
- 15:53:41they should have no management authority
- 15:53:44over the team. And I get a lot of
- 15:53:46questions about this. Uh you know, why
- 15:53:48can't they be a manager? Well, the scrum
- 15:53:50master has to be, if you will, a friend
- 15:53:53to the team, right? A coach to the team.
- 15:53:56And it's a very unique manager, uh, you
- 15:53:58know, that the team members can come to
- 15:54:00and tell them, you know, I don't feel I
- 15:54:02have enough training for this or I don't
- 15:54:03feel I can I'm good enough to do that or
- 15:54:05whatever. They need somebody they can
- 15:54:06confide in. And usually that's not a
- 15:54:08management person or somebody you know
- 15:54:10who controls uh that person's salary.
- 15:54:12And so they they need to be there to
- 15:54:14lend an ear and to help the team. So I
- 15:54:16recommend that they not be a manager of
- 15:54:19the team. They be somebody else that the
- 15:54:20team can confide in.
- 15:54:23Then there's the scrum team themselves.
- 15:54:26This is a crossf functional team
- 15:54:28consists of developers, testers,
- 15:54:30business analysts, domain experts,
- 15:54:31operations people. If you're doing
- 15:54:33DevOps, I mean it's a crossf functional
- 15:54:35team. very very very important that it's
- 15:54:38not just software engineers like we used
- 15:54:40to do traditionally when we did uh
- 15:54:42waterfall development.
- 15:54:44The scrum team is self-organizing.
- 15:54:46There's no externally assigned roles.
- 15:54:48Everybody is equal. Everybody has the
- 15:54:50same role. They're part of the scrum
- 15:54:52team. Uh they are self-managing. They
- 15:54:55self assign themselves work. So uh when
- 15:54:57you're looking at you know the combon
- 15:54:59board uh and you're saying well how do I
- 15:55:01know if somebody I've assigned enough
- 15:55:03work to somebody? The answer is you
- 15:55:05don't because you don't assign work to
- 15:55:07anyone. The scrum team pulls the work
- 15:55:09off of the combon board, assigns it to
- 15:55:12themselves and starts working on it.
- 15:55:14Very very different. It's why I say, you
- 15:55:16know, scrum easy to understand,
- 15:55:17difficult to master. Some people can't
- 15:55:20get the hang of this, but this is how it
- 15:55:21works. You've got to let them uh be
- 15:55:23self-managing.
- 15:55:25Now, they shouldn't be too large. A
- 15:55:27scrum team is 7 plus or minus two. I've
- 15:55:29heard some people say five plus or minus
- 15:55:31two, but the idea is that they're small.
- 15:55:32They're not 20 25 people. They should be
- 15:55:36colllocated if at all possible. They are
- 15:55:38most successful when they're
- 15:55:39coll-located. There is empirical data
- 15:55:41for that, right? They just are more
- 15:55:43successful when people are together
- 15:55:44hopefully in the same team room. But if
- 15:55:46they can't be, my recommendation is if
- 15:55:48the team has to be geographically
- 15:55:50dispersed, put at least two members in a
- 15:55:52geography or time zone so that they can
- 15:55:55collaborate together and then maybe have
- 15:55:57other people on the team in another time
- 15:55:58zone. Don't just stick one person alone
- 15:56:00in a time zone. they kind of get
- 15:56:02forgotten about and it it's really not
- 15:56:03fair to them. You need people to
- 15:56:05collaborate with. Uh very very very
- 15:56:07important. And then they're dedicated.
- 15:56:10Most successful teams have long-term
- 15:56:12full-time members. They're not on
- 15:56:15multiple projects. They're not getting
- 15:56:16pulled off for other projects. You know,
- 15:56:18I've I've st I've stood in meetings uh
- 15:56:21daily standups where someone says, "What
- 15:56:22did you do yesterday?" And they say, "My
- 15:56:24manager pulled me off to do something
- 15:56:25else. I didn't get anything done for
- 15:56:27this project yesterday." That is a sign
- 15:56:29that you're in trouble, right? You do
- 15:56:31not want to have people on multiple
- 15:56:32projects. You want them to be dedicated
- 15:56:34if you want to be a high performing
- 15:56:37successful team.
- 15:56:39They negotiate commitments with the
- 15:56:41product owner one sprint at a time.
- 15:56:44They're not committing for what they're
- 15:56:45going to do down the road. They're not
- 15:56:47committing in January for what they're
- 15:56:48going to do in September. They're going
- 15:56:50to commit what am I going to get done in
- 15:56:51the next two weeks. And they've got a
- 15:56:54autonomy on how to reach those
- 15:56:55commitments. So they're not told how to
- 15:56:57do something. They're told what needs to
- 15:56:59get done and then get out of their way.
- 15:57:00You hired good people. Let them do their
- 15:57:02thing and let them figure out how to get
- 15:57:04that thing done.
- 15:57:07In this video, you learn that the
- 15:57:09product owner represents stakeholders,
- 15:57:10articulates the product vision, and
- 15:57:12decides priorities, requirements, and
- 15:57:14readiness to ship. The scrum master
- 15:57:16coaches the team, promotes a cooperative
- 15:57:19environment, shielding the team from
- 15:57:20interference and unblocking impediments.
- 15:57:23The scrum team is small, dedicated,
- 15:57:26colloccated, cross-functional, and
- 15:57:28self-managing.
- 15:57:29The scrum team negotiates commitments
- 15:57:31with the product owner one sprint at a
- 15:57:33time. The scrum team has autonomy
- 15:57:36regarding how to reach its commitments.
- 15:57:38[Music]
- 15:57:49After watching this video, you'll be
- 15:57:51able to describe the three Scrum
- 15:57:53artifacts, explain the five Scrum
- 15:57:55events, and discuss the benefits of
- 15:57:57Scrum. Let's take a look at the
- 15:58:00artifacts of Scrum. The first is the
- 15:58:02product backlog. This is a list of all
- 15:58:05the stories you're ever going to want to
- 15:58:06do. It's all your requirements for the
- 15:58:08product that haven't been done yet. So
- 15:58:11any stories that are not in the current
- 15:58:12sprint are in the product backlog. Some
- 15:58:15teams have a product backlog and an ice
- 15:58:17box and a release backlog, but for the
- 15:58:19most part, we'll call those all the
- 15:58:21product backlog. Everything you're ever
- 15:58:23going to do in the future. Then there's
- 15:58:26the sprint backlog. Those are the
- 15:58:28stories that you're going to do in the
- 15:58:29next two weeks, in the next sprint. So
- 15:58:32those are stories that are kind of on
- 15:58:34deck uh to be executed.
- 15:58:37And then you've got a done increment. A
- 15:58:39done increment is a product increment
- 15:58:42that is completed by the end of a
- 15:58:44sprint. And so you work for two weeks in
- 15:58:46a sprint and then hopefully at the end
- 15:58:48of that you've got a complete or done
- 15:58:50increment. Scrum has five events. The
- 15:58:54first is the sprint planning meeting.
- 15:58:56That's where you get together to plan
- 15:58:58out the sprint. Uh in that meeting,
- 15:59:00you'll have the product owner and the
- 15:59:03scrum master and the entire team
- 15:59:05planning out what to do next where the
- 15:59:07team commits to the stories that they're
- 15:59:09going to fulfill in the next sprint.
- 15:59:11Then you've got the daily scrum or daily
- 15:59:14stand-up meeting. And this happens every
- 15:59:15day, right? usually in the same place,
- 15:59:18same time um where they meet to kind of
- 15:59:20synchronize on how are we doing, what
- 15:59:22are we going to get done today um and is
- 15:59:25anybody have any impediments uh that can
- 15:59:27be relieved by the scrum master. Then
- 15:59:30there's the sprint itself, right? That
- 15:59:32is the two weeks in which everybody is
- 15:59:34working. And then at the end of the
- 15:59:36sprint, you have a sprint review. That's
- 15:59:38demo time. That's when you demonstrate
- 15:59:40what you've done to the stakeholders so
- 15:59:42they could see the advancements that
- 15:59:44you've gotten, the new features that
- 15:59:46you've put in the product. And then
- 15:59:48finally, and most importantly, is the
- 15:59:50sprint retrospective. That retrospective
- 15:59:53is where the team reflects on what went
- 15:59:56well, what didn't go well, what could we
- 15:59:58change uh for the future.
- 16:00:01So what are some of the benefits of
- 16:00:02using scrum? Well, higher productivity,
- 16:00:06right? When everybody is meeting every
- 16:00:07day to understand what to do, when we've
- 16:00:09got a conbon board with all our work in
- 16:00:12progress so everyone can see what
- 16:00:13everyone's working on, it lends itself
- 16:00:15to higher productivity uh because people
- 16:00:18are kind of self-managing and being very
- 16:00:19productive. It's also better quality,
- 16:00:22right? Better software quality because
- 16:00:24the team is engaged in what they're
- 16:00:26doing. They're running tests. They're
- 16:00:28using behavior-driven development.
- 16:00:29They're using test-driven development,
- 16:00:31right? and they're getting higher
- 16:00:33quality out of their um out of the code
- 16:00:35that they're writing because they're
- 16:00:36constantly testing it. You get reduced
- 16:00:39time to market because you're working in
- 16:00:41small increments. So small increments
- 16:00:43mean I get something done, I get a done
- 16:00:45increment sooner that I can then put out
- 16:00:47and have customers test and have
- 16:00:49customers enjoy. You're also increasing
- 16:00:52stakeholder satisfaction because they're
- 16:00:54not waiting months and months and months
- 16:00:55to see if whatever you've built is what
- 16:00:57they want. They get to see it much
- 16:00:59quicker. That makes them much happier.
- 16:01:01And then of course you get better team
- 16:01:03dynamics because it's transparent.
- 16:01:05Everyone knows what everyone's working
- 16:01:07on. Everybody chips in when somebody
- 16:01:09gets stuck. It's really really a better
- 16:01:11environment and a more productive
- 16:01:12environment for developers to be working
- 16:01:14in. And finally that leads to happier
- 16:01:17employees, right? Employees understand
- 16:01:19that they are in control. Uh they are
- 16:01:21pulling things off the backlog. Uh
- 16:01:23they're committing to a sprint uh one
- 16:01:26one sprint plan at a time. and so they
- 16:01:28feel more in control and they feel
- 16:01:29happier about their jobs. I want to take
- 16:01:32a look for a moment at scrum versus
- 16:01:34conbon. We're going to use a conbon
- 16:01:36board in uh scrum, but we're not going
- 16:01:38to follow the whole conbon process. So,
- 16:01:40I just want to show you what's different
- 16:01:42about it when we talk about scrum and
- 16:01:44talk about conbon. First, there's the
- 16:01:47cadence. Scrum uses fixed length
- 16:01:49sprints, usually two weeks in in
- 16:01:51duration. Conbon is continuous flow.
- 16:01:54It's it's something you would do on a
- 16:01:56manufacturing floor, right? You don't
- 16:01:58produce a batch of cars every two weeks.
- 16:02:00You have cars coming off the assembly
- 16:02:02line all day long. Uh the release
- 16:02:05methodologies are different, right?
- 16:02:07Scrum releases at the end of a sprint.
- 16:02:09And Conbon does continuous delivery. And
- 16:02:12so some teams do do software and follow
- 16:02:14Conbon where they continuously deliver
- 16:02:16code. Whenever the code is ready, they
- 16:02:18push it out. They don't wait till the
- 16:02:20end of a sprint. But scrum uses these uh
- 16:02:22fixed length sprints to do release. And
- 16:02:25then there's the roles. I we just shown
- 16:02:28you that we have product owners and
- 16:02:29scrum masters and and and development
- 16:02:31teams in scrum. There are no real roles.
- 16:02:34There could be an agile coach in
- 16:02:35combine, but there are no roles in
- 16:02:37conbon. There are just the people who
- 16:02:38are working to produce whatever it is
- 16:02:40you're producing. And then the key
- 16:02:42metrics in scrum is velocity. We haven't
- 16:02:45learned about velocity yet, but velocity
- 16:02:47is how much work a uh team can get done
- 16:02:50in two weeks. Conbon looks at cycle
- 16:02:52time. You know, how long does it take
- 16:02:54from inception to get getting something,
- 16:02:56you know, off of the off of the assembly
- 16:02:57line, right? From beginning to end, what
- 16:02:59are my cycle times of, you know, maybe
- 16:03:01getting an order from a customer and
- 16:03:03actually producing the number of things
- 16:03:05that are in that order.
- 16:03:07And then there's a change in philosophy,
- 16:03:10right? In scrum team should strive not
- 16:03:12to make changes to the sprint forecast
- 16:03:14during the sprint. Sometimes it happens,
- 16:03:16sometimes you have to do it, but what
- 16:03:18you want to do is that two weeks is
- 16:03:20locked in and if anything else needs to
- 16:03:21be done, we we'll address it at the end
- 16:03:23of the two weeks. Whereas conbon change
- 16:03:25can happen at any time. They're
- 16:03:27continuously improving, continuously
- 16:03:30changing. Um and and anyone can decide
- 16:03:32there's a defect in something and make a
- 16:03:34change and change the process and keep
- 16:03:36going. Um there's there's no limit to uh
- 16:03:38to the change philosophy.
- 16:03:41In this video, you learned that scrum
- 16:03:43produces a product backlog, a sprint
- 16:03:45backlog, a complete or done increment.
- 16:03:49The scrum events are sprint planning,
- 16:03:51daily scrum meetings, sprints, sprint
- 16:03:53reviews, and sprint retrospectives.
- 16:03:56If done well, Scrum can increase
- 16:03:58employee productivity and happiness,
- 16:04:00improve product quality, reduce time to
- 16:04:03market, and enhance stakeholder
- 16:04:05satisfaction.
- 16:04:06[Music]
- 16:04:17After watching this video, you'll be
- 16:04:20able to describe how proper organization
- 16:04:21contributes to success. Explain how
- 16:04:24teams should be aligned. Explain why
- 16:04:26autonomy is important and discuss why
- 16:04:28the entire organization must adopt agile
- 16:04:31to be effective.
- 16:04:34I can't stress enough how critical
- 16:04:36organization is to success. A lot of
- 16:04:39companies don't understand this. They go
- 16:04:41in with their existing teams and they
- 16:04:43think they're going to make those teams
- 16:04:44agile. But what they don't realize is
- 16:04:46that your existing teams may need to be
- 16:04:49reorganized in order to take full
- 16:04:51advantage of becoming agile.
- 16:04:54Back in 1968, Melvin Conway made a
- 16:04:57statement that is now known as Conway's
- 16:04:58law. Any organization that designs a
- 16:05:01system defined broadly will produce a
- 16:05:03design whose structure is a copy of the
- 16:05:06organization's communication structure.
- 16:05:08What this means is if you ask four teams
- 16:05:11to build a compiler, you're going to get
- 16:05:13a fourpass compiler. You should not be
- 16:05:15surprised you got a fourpass compiler.
- 16:05:17You ask four teams to build it.
- 16:05:20Likewise, if you have a UI team and an
- 16:05:22app team and a database team, they're
- 16:05:24going to build a three- tier
- 16:05:25architecture. And you should not be
- 16:05:27surprised you got a three- tier
- 16:05:28architecture, you ask three teams to
- 16:05:30build it. So, how should these teams be
- 16:05:33organized? They should be aligned. You
- 16:05:36want them to be loosely coupled. You
- 16:05:37don't want a lot of dependency between
- 16:05:39teams, but you want the teams to be
- 16:05:40tightly aligned because they are
- 16:05:42building a single application. And then
- 16:05:45each team has its own mission, which
- 16:05:47should be aligned with the business. If
- 16:05:49I was developing an e-commerce
- 16:05:51application and I had 50 developers, I
- 16:05:53wouldn't put them on one big team like I
- 16:05:55did when I built monoliths, what I would
- 16:05:57do is I would break them up into smaller
- 16:05:59teams, an order team, an accounts team,
- 16:06:01a shop cart team, a recommendation team,
- 16:06:04right? And they would have ownership of
- 16:06:06that business area. And then the team
- 16:06:09should have endtoend responsibility. You
- 16:06:12want them to build it, run it, and debug
- 16:06:14it in production. You want that team to
- 16:06:16be responsible end to end for what
- 16:06:19they're building. And then finally, they
- 16:06:21need to have a long-term mission. It
- 16:06:24really doesn't work well when you're
- 16:06:25pulling people on and off projects
- 16:06:27because they don't feel a sense of
- 16:06:29ownership. So a long-term mission is
- 16:06:32critical to business success. Autonomy
- 16:06:35is critically important. It's motivating
- 16:06:37and motivated people build better stuff.
- 16:06:40It's just a fact. It's fast. decisions
- 16:06:44happen locally on the team level rather
- 16:06:46than waiting for decisions to come down
- 16:06:48from on high. You know, this is what
- 16:06:50really holds people up. And so by
- 16:06:53minimizing these handoffs and and
- 16:06:55waiting around, the teams don't get
- 16:06:57bogged down. They get to make their own
- 16:06:59decisions and they get to run at their
- 16:07:01own speed.
- 16:07:03This graphic, the wall of confusion, was
- 16:07:05made famous by Andrew Clay Schaefer, but
- 16:07:07it's all about the diametrically opposed
- 16:07:09metrics that we use with development and
- 16:07:11operations. Development wants change,
- 16:07:14right? They are measured on getting new
- 16:07:16changes out into production. Whereas
- 16:07:18operations, they're measured on
- 16:07:20stability. How do you make the system
- 16:07:22stable? Don't change anything. These are
- 16:07:25diametrically opposed views. And if you
- 16:07:26hold these views in your organization,
- 16:07:29it doesn't matter how agile you are,
- 16:07:31you're not going to get the benefits
- 16:07:32that you think you're going to get. Now,
- 16:07:34I didn't draw this graphic, but I was on
- 16:07:37a project just like this. We were being
- 16:07:39agile. We started out in January and we
- 16:07:42were working in sprints and finally in
- 16:07:44the middle of February we had something
- 16:07:46we wanted to deploy and so we went to
- 16:07:48the operations team and they said open a
- 16:07:51ticket. We figure okay we'll open a
- 16:07:53ticket we'll get it deployed in a week
- 16:07:55or so and the ticket stayed later and
- 16:07:58later and later and we waited and we
- 16:08:00developed more functionality and still
- 16:08:02getting didn't get deployed. Well the
- 16:08:05finally the application got deployed in
- 16:08:07September and I left the project in
- 16:08:09December. I couldn't take it anymore.
- 16:08:11The moral here is if the entire
- 16:08:13organization doesn't become agile, it
- 16:08:16doesn't matter that your development
- 16:08:17team is agile if your ops team is not.
- 16:08:20This is what DevOps is all about. And
- 16:08:23you really should look into adopting
- 16:08:25DevOps if you want to take full
- 16:08:27advantage of becoming agile. Otherwise,
- 16:08:30they're just going to wait and wait and
- 16:08:32wait for the ops team to catch up to the
- 16:08:34agile development team.
- 16:08:36Let's look at the alignment of agile and
- 16:08:39DevOps. One of the goals of agile is to
- 16:08:42deliver software faster. While DevOps
- 16:08:44goal is accelerating time to market,
- 16:08:47perfectly aligned. In agile, we want to
- 16:08:50be responsive to change. And in DevOps,
- 16:08:52we're trying to tightly align the IT
- 16:08:54organization with the business to um to
- 16:08:57produce business value. In agile, we're
- 16:09:01looking at obtaining higher quality. And
- 16:09:03in DevOps, we're trying to increase the
- 16:09:04productivity of it. Those two goals are
- 16:09:08in alignment. And so quite often, if you
- 16:09:11really want to get the full benefit of
- 16:09:13being agile, you should look into
- 16:09:15adopting DevOps as a practice as well,
- 16:09:17so that the ops team is just as agile as
- 16:09:21the development team.
- 16:09:23In this video, you learn that how you
- 16:09:26are organized can affect the systems
- 16:09:28that you build. Giving teams autonomy
- 16:09:31leads to motivated teams who can execute
- 16:09:33faster and build better systems. Not
- 16:09:36adopting agile across your organization
- 16:09:38can lead to operational bottlenecks. And
- 16:09:41agile and DevOps are closely aligned
- 16:09:44goals.
- 16:09:45[Music]
- 16:09:57After watching this video, you'll be
- 16:09:59able to discuss how agile is more than
- 16:10:00just iterative development and describe
- 16:10:03what agile is not. I want to introduce
- 16:10:06you to a pitfall that a lot of
- 16:10:08organizations fall into. They claim that
- 16:10:11they're agile and then they start a new
- 16:10:13project and so they've got this studying
- 16:10:16and approval going on, this design and
- 16:10:18planning. We call this the fuzzy front
- 16:10:20end, right? They're kind of doing
- 16:10:22waterfall stuff. They're building
- 16:10:24requirements. They're doing a lot of
- 16:10:25planning, a lot of upfront stuff. Uh,
- 16:10:28and it doesn't really seem agile.
- 16:10:31Then they get into doing the actual
- 16:10:33development. And there they're being
- 16:10:35iterative. So they're iterating on the
- 16:10:37plan, iterating, iterating, iterating.
- 16:10:39The problem is they're just iterating.
- 16:10:42They're not being agile. They're not
- 16:10:44stopping at the end of each iteration to
- 16:10:47get feedback from the customer because
- 16:10:48they haven't deployed anything. They
- 16:10:50have no way of getting feedback from the
- 16:10:52customer. They're not stopping at the ev
- 16:10:54end of every iteration and saying,
- 16:10:56"Should I pivot or persevere?" They're
- 16:10:59just following a plan. Iterating,
- 16:11:01iterating, iterating, following the
- 16:11:04plan. And then finally, there's what we
- 16:11:06call the last mile where they're trying
- 16:11:09to deploy it and it takes forever to
- 16:11:11deploy because nobody's ever deployed it
- 16:11:13before. This is the first time
- 16:11:15everything's been integrated together,
- 16:11:17right? And the operations team is trying
- 16:11:18to get it all working and it takes a
- 16:11:20long, long time. People think they're
- 16:11:23agile. They think they're working agile
- 16:11:25simply because they're iterating. But we
- 16:11:27like to call this water scrumfall.
- 16:11:30They're just doing waterfall with they
- 16:11:33think they're doing scrum in the middle.
- 16:11:34They're not really doing scrum in the
- 16:11:36middle. They're just doing iterative
- 16:11:37development. And so this is a pitfall a
- 16:11:40lot of companies fall into. Uh and it's
- 16:11:42really not being agile. If a company is
- 16:11:45doing all this planning up front,
- 16:11:47they're not being agile. They're not
- 16:11:48going to be responsive to change.
- 16:11:50they're not going to be getting fast
- 16:11:51feedback unless they're deploying
- 16:11:52quickly. So, this is a pitfall you want
- 16:11:55to avoid. So, let's talk about what
- 16:11:58agile is not. Agile is not just an
- 16:12:01iterative software development like
- 16:12:03cipher like a mini waterfall. If you're
- 16:12:05going to do waterfall tactics and plan
- 16:12:07everything out, you're not going to be
- 16:12:09agile. Agile is not just developers
- 16:12:12working in sprints, right? The
- 16:12:14development team in agile are developers
- 16:12:17and testers and business analysts and
- 16:12:20maybe ops people if you're doing DevOps,
- 16:12:22right? It's a crossf functional team.
- 16:12:24It's not just software engineers.
- 16:12:27And the agile manifesto has no mention
- 16:12:30of an agile project manager, right? So
- 16:12:33there are no agile project managers. If
- 16:12:35you've got a project manager who's doing
- 16:12:38command and control, you're not being
- 16:12:40agile.
- 16:12:42In this video, you learned that many
- 16:12:44companies adhere to their waterfall
- 16:12:45planning and just call it agile. Simply
- 16:12:49doing iterative development is not agile
- 16:12:51unless you are being responsive to
- 16:12:53change and delivering value often.
- 16:12:56Project management is very different
- 16:12:58when working as an agile team because
- 16:13:00self-managed teams assign work to
- 16:13:02themselves.
- 16:13:04[Music]
- 16:13:15After watching this video, you'll be
- 16:13:17able to articulate why upfront planning
- 16:13:19leads to missed deadlines and summarize
- 16:13:21why iterative planning leads to greater
- 16:13:23accuracy.
- 16:13:25Douglas Adams famously once said, "I
- 16:13:28love deadlines. I love the whooing sound
- 16:13:30they make as they go by. There goes
- 16:13:32another deadline." This happens to us
- 16:13:34all the time. We put a stake in the
- 16:13:36ground and we miss it. The question is,
- 16:13:39why does this happen? But more
- 16:13:41importantly, what can we do to avoid it?
- 16:13:46I like to call this navigating the
- 16:13:47unknown, right? So, if I told you that
- 16:13:50you need to navigate across this field
- 16:13:51of penguins, um, you know, you might
- 16:13:54look down at the bottom there and say,
- 16:13:55"Well, I can I can kind of put my foot
- 16:13:57here and and maybe step in and step
- 16:14:00around and but then when you get to the
- 16:14:01middle, like how do you plot a course to
- 16:14:04the other side?" Oh, and by the way, the
- 16:14:06penguins are going to keep moving as
- 16:14:08you're moving through them. A lot like
- 16:14:10software development where the the
- 16:14:12operating system is getting patched and
- 16:14:13p and packages are getting patched and
- 16:14:15you know things keep moving moving. But
- 16:14:18you know that as you kind of tiptoe into
- 16:14:20the middle of those penguins and you
- 16:14:22look down, it's going to look a lot like
- 16:14:24it did at the beginning when you because
- 16:14:27you know more. You're at a different
- 16:14:28vantage point. And that's the whole
- 16:14:30idea, right? From this vantage point,
- 16:14:33you can probably continue to plot along
- 16:14:35and as you get closer, you'll have the
- 16:14:37next vantage point where you can plot
- 16:14:38along. So the message here is don't
- 16:14:42decide everything at the point you know
- 16:14:44the least. We do this all the time. At
- 16:14:46the beginning of a project, we know
- 16:14:48practically nothing. We know very little
- 16:14:50about the project. Uh and that's when we
- 16:14:52do all of our planning, right? As if we
- 16:14:54can figure out what's going to happen
- 16:14:55towards the end. So stop doing that,
- 16:14:57right? That's what agile is all about.
- 16:14:59Iterative planning. Don't decide
- 16:15:01everything in the beginning when you
- 16:15:03know the least. What you want to do is
- 16:15:05just plan for what you know and then as
- 16:15:08you move along right you decide you know
- 16:15:10more you adjust the plan. So your
- 16:15:12estimates are going to be more accurate
- 16:15:14this way because you know if somebody
- 16:15:15asks you what are you going to be doing
- 16:15:163 months from now tell them well I can
- 16:15:19tell you that with maybe 50% accuracy
- 16:15:21right but I can tell you with almost
- 16:15:23100% accuracy what I'm going to do 2
- 16:15:24weeks from now right and the two weeks
- 16:15:26after that. So the idea here is don't
- 16:15:29try to be omnipotent cuz you're not
- 16:15:31right. Don't try to plan everything up
- 16:15:32front. You want to plan as you go and as
- 16:15:34you learn more then you could add more
- 16:15:36to the plan and get greater and greater
- 16:15:38estimates at where you are and how long
- 16:15:40it's going to take for you to get there.
- 16:15:43In this video you learned that planning
- 16:15:45everything at the beginning of the
- 16:15:46project can lead to missed deadlines and
- 16:15:48iterative planning allows for course
- 16:15:50corrections and more accurate estimates.
- 16:15:53[Music]
- 16:16:04After watching this video, you'll be
- 16:16:06able to describe why placing existing
- 16:16:08people in new roles without training
- 16:16:10will lead to failure.
- 16:16:13So, I'd like to discuss some
- 16:16:14organizational things that people do
- 16:16:16when they're trying to become agile that
- 16:16:18do lead to failure. And one is placing
- 16:16:21people in a new role without giving them
- 16:16:23training. So the product manager becomes
- 16:16:25the product owner. There's a big
- 16:16:27difference here. The product manager is
- 16:16:28a job title. Product owner is a scrum
- 16:16:31role. They may be the same person. They
- 16:16:33may not be the same person. Then I see
- 16:16:35the project manager becoming the scrum
- 16:16:37master with no training on how to be a
- 16:16:39scrum master. And finally the
- 16:16:42development team becomes a scrum team,
- 16:16:43but they're just software engineers.
- 16:16:45There's no testers on the team. There's
- 16:16:47no ops people on the team. There's no
- 16:16:49business analysts or anything on the
- 16:16:50team. So let's look a little deeper into
- 16:16:53why doing these things leads to failure.
- 16:16:56First, there's the product manager
- 16:16:58becoming the product owner. The product
- 16:17:00manager is usually a business person who
- 16:17:02manages the budget. They may or may not
- 16:17:04have a vision for where things are
- 16:17:06going, but the product owner is the
- 16:17:08visionary who leads the team in a series
- 16:17:10of experiments designed to achieve
- 16:17:12whatever the sprint goal is. And these
- 16:17:14are not often the same sets of skills.
- 16:17:17you need to be more focused on where to
- 16:17:19take the product than how to uh manage
- 16:17:22the budget and also the product manager
- 16:17:25is usually a person they're focused on
- 16:17:26operational assets of the business right
- 16:17:29instead of being a conduit between the
- 16:17:31stakeholders and the team translating
- 16:17:33those business um requirements into the
- 16:17:36technical goals that the team needs to
- 16:17:38achieve. So just be careful. Some
- 16:17:40project uh product managers are good at
- 16:17:42being product owners, some of them are
- 16:17:43not. Just understand while one of them
- 16:17:45is a job title, the other one is a role
- 16:17:47in scrum and it may not be the same
- 16:17:50person.
- 16:17:52The next thing is the project manager
- 16:17:53becoming the scrum master. It's key to
- 16:17:56understand how project managers work. A
- 16:17:59project manager is a task manager. They
- 16:18:01keep everyone marching to a plan. You
- 16:18:03know, when I teach agile, uh, quite
- 16:18:05often I'll get someone in the back of
- 16:18:06the room who's watching me do our sprint
- 16:18:08planning and creating our combine board,
- 16:18:10and they'll say, "Uh, excuse me. How do
- 16:18:12I know when I've uh, assigned too much
- 16:18:14work to somebody?" And the answer is,
- 16:18:17you don't assign work to anyone. That's
- 16:18:19why there's no way to tell, right?
- 16:18:21They're a self-managing team. They
- 16:18:22assign work to themselves. So, it's a
- 16:18:24very different job role being a scrum
- 16:18:26master where you're a coach that keeps a
- 16:18:28team focused on the current sprint, on
- 16:18:30being self-managed. The other big
- 16:18:32difference between a project manager and
- 16:18:34a scrum master is that when the project
- 16:18:37manager feels that you have an
- 16:18:38impediment, they document the risk in
- 16:18:40their little spreadsheet. Right? This is
- 16:18:42what they do. They document risks. Uh
- 16:18:44and so if I've got a a problem, I've got
- 16:18:47some blockage. The project manager going
- 16:18:49to say, "What are you going to do to
- 16:18:50unblock yourself as opposed to a scrum
- 16:18:52master that eliminates impediments while
- 16:18:54buffering the team from interruptions?"
- 16:18:56And so if the team says, "I have an
- 16:18:58impediment," the scrum master should
- 16:19:00say, "Uh, let me handle that for you.
- 16:19:02You go work on something uh more
- 16:19:04productive and let me get that out of
- 16:19:06your way." Project managers will almost
- 16:19:08never say that. So it really takes a
- 16:19:10different kind of person to take the
- 16:19:12role of scrum master than the way
- 16:19:14project managers were taught to manage
- 16:19:15projects to a plan and document risks.
- 16:19:19And finally, it's the development team
- 16:19:21versus the scrum team. I mean, a
- 16:19:22development team is usually just
- 16:19:24software engineers, right? just
- 16:19:25developers but a scrum team is a cross
- 16:19:27functional team. It includes developers
- 16:19:29and testers and security people and
- 16:19:31business analysts and ops uh anybody
- 16:19:33that we need to go build and increment.
- 16:19:35So it's very important that you
- 16:19:37reorganize and you create crossf
- 16:19:39functional development teams not just a
- 16:19:41group of software engineers.
- 16:19:45This is my favorite quote from Bill
- 16:19:47Caner. Until and unless business leaders
- 16:19:49accept the idea that they are no longer
- 16:19:51managing project with fixed functions,
- 16:19:53time frames and cost as they did with
- 16:19:54waterfall, they will struggle to use
- 16:19:57agile as it was designed to be used.
- 16:20:00So the roles have changed. You can't put
- 16:20:03people in a new role without giving them
- 16:20:06training, right? Otherwise, a project
- 16:20:08manager will try as hard as they might
- 16:20:10to turn a combine board into a Gant
- 16:20:13chart because that's all they know is
- 16:20:15managing projects with Gant charts. Very
- 16:20:18important that this mindset has to come
- 16:20:20down from upper management. Upper
- 16:20:22management cannot be asking you to
- 16:20:24predict things way far into the future.
- 16:20:26Instead of asking what are you going to
- 16:20:27get done by the end of the year, they
- 16:20:29should be saying what are you going to
- 16:20:30do in the next two weeks? How are you
- 16:20:31going to delight my customers at the end
- 16:20:33of the next sprint?
- 16:20:35In this video, you learn that placing
- 16:20:38existing people in new roles without the
- 16:20:40proper training will lead to failure
- 16:20:42because agile roles need a different
- 16:20:44focus and new priorities. The agile
- 16:20:47mindset must be adopted by management.
- 16:20:50[Music]
- 16:21:02After watching this video, you'll be
- 16:21:04able to describe what a conbon board is,
- 16:21:06explain what each pipeline is used for,
- 16:21:08and summarize the workflow across a
- 16:21:10conbon board.
- 16:21:13So, there are lots of agile planning
- 16:21:16tools out there. But one thing you need
- 16:21:18to understand is that a tool won't make
- 16:21:21you agile. You really have to have the
- 16:21:24agile mindset to become agile. Tools
- 16:21:26will support your agile process, but you
- 16:21:29have to have the process first. I've
- 16:21:31seen a lot of people who haven't had
- 16:21:33training try to make a conbon board look
- 16:21:35like a Gant chart. Those are two
- 16:21:37different things, two different ways of
- 16:21:38doing project management. So, it's
- 16:21:40really important that you understand
- 16:21:42this. And there are lots and lots and
- 16:21:44lots of agile planning tools. Most of
- 16:21:46them do the same thing. Um, but some of
- 16:21:48them are a little more complicated than
- 16:21:50others. I just need epics and stories to
- 16:21:52describe my plans. Some of them go into
- 16:21:55tasks and subtasks and I don't that's
- 16:21:57micromanaging in my estimation, right?
- 16:22:00just epics and stories are fine. And so
- 16:22:02I like to use a tool called uh Zenhub
- 16:22:04and we're going to use Zenhub for this
- 16:22:06course. So what is Zenhub? Well, it's a
- 16:22:10plugin to GitHub. It's one of the
- 16:22:12reasons I like it. My developers stay in
- 16:22:14GitHub and they use this Zenhub plugin.
- 16:22:17What ZenHub does, it allows you to add
- 16:22:20project management tools, a conbon board
- 16:22:23to manage your projects while you remain
- 16:22:25in GitHub. So that's pretty important to
- 16:22:28me. Um the other is is that Zenhub is
- 16:22:31customizable. It starts out with a set
- 16:22:33of uh columns which are called pipelines
- 16:22:36uh in your combon board, but you can
- 16:22:38customize them to be anything you like.
- 16:22:40You can make it as complex or as simple.
- 16:22:42I like to keep them simple. So why do we
- 16:22:45use it? Well, one of the main reasons is
- 16:22:48because it uses GitHub issues. It's not
- 16:22:51another tool with another thing that I
- 16:22:53have to go off and edit. And that's one
- 16:22:55of the problems I find is if you're
- 16:22:57using too many tools and a developer has
- 16:23:00to go someplace else to update the
- 16:23:01status, that status is going to be out
- 16:23:04of date 100% of the time because as soon
- 16:23:06as they update it, they're going to go
- 16:23:07on and do something else and it's not
- 16:23:09going to be reflected in the status. So
- 16:23:11that's the reason I like Zenhub. It
- 16:23:13provides an easy way to understand what
- 16:23:16is going on. I've got my combine board
- 16:23:18in GitHub and if anybody asks me how's
- 16:23:21the project going, management wants to
- 16:23:23know where are you? They can open up the
- 16:23:25Zenhub combine board. They could see all
- 16:23:26the issues that are still in the sprint,
- 16:23:28haven't been worked on, all the issues
- 16:23:30that are currently being worked on and
- 16:23:32who's working on them and all of the
- 16:23:34issues that we already have done. So
- 16:23:36very very important to get a quick
- 16:23:38status of where we are in a project. And
- 16:23:41as I said, it maintains an upto-date one
- 16:23:44version of the truth. Developers work on
- 16:23:47stories in GitHub all day long. The
- 16:23:50issues in GitHub, which are stories,
- 16:23:51those issues are the things that they
- 16:23:53open and close and they don't have to go
- 16:23:55someplace else to update the status. The
- 16:23:58status is kept right in their favorite
- 16:23:59tool, GitHub.
- 16:24:02So, it allows developers to go one place
- 16:24:05to get things done and not have to
- 16:24:07update multiple tools.
- 16:24:10So, what is a conbon board? We've been
- 16:24:12talking about conbon boards here. Very
- 16:24:14simply put, there's things that you need
- 16:24:16to do, things that you're doing, and
- 16:24:18things that you've already gotten done.
- 16:24:20It doesn't have to be any more
- 16:24:21complicated than that. People make it
- 16:24:23very, very complicated, but it's kind
- 16:24:25of, you know, what I got to get done,
- 16:24:27what am I working on now, and what have
- 16:24:29I already done? And you move things
- 16:24:31across the conbon board um in order to
- 16:24:34uh show the progress that you're making.
- 16:24:36So, it's a very visual way of seeing
- 16:24:38exactly where you are at any point in
- 16:24:40time. Now, here's a real conbon board.
- 16:24:44Uh, and as you can see, it's got the uh
- 16:24:46the product backlog. Um, and it's got
- 16:24:48what's on deck. It's got what's doing
- 16:24:50and what we have done. So, it's kept it
- 16:24:53very simple, but this is a real conbon
- 16:24:56board. It's not a tool. It's not some
- 16:24:58electronic thing. It's a physical
- 16:25:00whiteboard with a bunch of sticky notes.
- 16:25:02So in true conbon fashion of having a
- 16:25:05billboard note, a note that moves along
- 16:25:08the supply chain, moves along the
- 16:25:09management uh the uh manufacturing
- 16:25:12chain, that's what they do. You take a a
- 16:25:14sticky note and you write the story on
- 16:25:16it and then you move the sticky note
- 16:25:18across the whiteboard across those
- 16:25:20columns. I mean that's as simple as a
- 16:25:22conbon board needs to be.
- 16:25:25So let's talk about the default
- 16:25:27pipelines or columns that are in Zenhub.
- 16:25:32It starts with new issues. New issues is
- 16:25:35like your inbox. When anybody opens up
- 16:25:37an issue, it defaults to going into the
- 16:25:39new issues column. And so I don't like
- 16:25:42to leave it there too long. Uh when I
- 16:25:44when I do my backlog refinement and I
- 16:25:46and I work on my combine board, I
- 16:25:49usually do new new issue triage first
- 16:25:51and say this is something that just came
- 16:25:53in. Where should it go? And I move it to
- 16:25:55another pipeline or I reject it. but I
- 16:25:58don't keep it in the new issue so that
- 16:26:00when another one comes in, I know, oh,
- 16:26:02that must be really new because I just
- 16:26:04cleaned that out. Kind of like your
- 16:26:05inbox for for emails. Then there's the
- 16:26:08ice box. This is unique to Zenhub, but I
- 16:26:11kind of like it. The ice box is cold
- 16:26:13storage. Uh it is where you put things
- 16:26:16that are going to be you're going to
- 16:26:17work on long term. So, if I'm not going
- 16:26:19to get to something for a while, I'll
- 16:26:21throw it in the ice box so I don't
- 16:26:22forget about it. Uh but then it is not
- 16:26:25in my other pipelines that I'm actively
- 16:26:27working on so that they don't get too
- 16:26:28cluttered up. After the ice box is the
- 16:26:31product backlog. The product backlog is
- 16:26:33everything you ever want to do forever
- 16:26:36in your product that you haven't done
- 16:26:37yet. Right? It doesn't contain things
- 16:26:39you're doing. It contains all the things
- 16:26:41you haven't put in a sprint that you
- 16:26:43want to work out at some time in the
- 16:26:45future. And again, in order to keep that
- 16:26:47product backlog not too cluttered,
- 16:26:49things that are long-term future, I like
- 16:26:52to move into the ice box. That brings us
- 16:26:54to the sprint backlog. The sprint
- 16:26:56backlog is what we're going to do in the
- 16:26:59next two weeks. So, I've taken things
- 16:27:01from the product backlog and moved them
- 16:27:03to the sprint backlog to make a sprint
- 16:27:05plan. Now, the developers don't have to
- 16:27:08worry about any of these other
- 16:27:09pipelines. they just concentrate on the
- 16:27:11sprint backlog because that is the work
- 16:27:13we're going to do in the next sprint.
- 16:27:16Then once we start working on things, we
- 16:27:18move them to in progress. So I know that
- 16:27:21when I see those cards, those stories in
- 16:27:23the in progress column, I know that
- 16:27:25somebody's working on them, as they
- 16:27:27assign them to themselves, their little
- 16:27:28avatar shows up. So I can see exactly
- 16:27:30who is working on what and what is being
- 16:27:33worked on as we speak. Once the work is
- 16:27:36complete, then a developer will usually
- 16:27:38create a pull request to go pull their
- 16:27:40work back into the base branch. And so
- 16:27:44those go into review QA. You can also
- 16:27:46set up GitHub and Zenhub so that it
- 16:27:49automatically creates pull requests in
- 16:27:51that review QA column. Uh and so that's
- 16:27:54so that developers know when they see
- 16:27:56something show up there that they need
- 16:27:58to go look at it and help another
- 16:28:00developer out and review their story. uh
- 16:28:02and and make sure that they get it it
- 16:28:05meets the criteria needed to go merge it
- 16:28:07into the rest of the code. And then
- 16:28:10finally, there's the done column. After
- 16:28:12we're all done, we've merged our code
- 16:28:14back, then we move the story to the done
- 16:28:17column. So done means the developer is
- 16:28:19done. It doesn't mean that it's been
- 16:28:21accepted by the product owner. That is
- 16:28:23something that happens during the sprint
- 16:28:25review, but it does mean that the
- 16:28:26developer is done with that story. They
- 16:28:28go back to the sprint backlog, pull
- 16:28:30another story into in progress, assign
- 16:28:33it to themselves, and keep working. So,
- 16:28:35the flow goes from left to right. New
- 16:28:38stories come in on the left, and a done
- 16:28:41increment winds up going out on the
- 16:28:43right.
- 16:28:45In this video, you learn that a conbon
- 16:28:48board is a way of tracking plan items
- 16:28:50needed to be done, items in progress,
- 16:28:52and items completed.
- 16:28:54A conbon board is made of multiple
- 16:28:56pipelines.
- 16:28:58Work moves from left to right as it is
- 16:29:00completed.
- 16:29:01[Music]
- 16:29:13After watching this video, you'll be
- 16:29:15able to define a user story, describe
- 16:29:18the parts of a good user story, explain
- 16:29:20why adding acceptance criteria is
- 16:29:22important, define the invest acronym,
- 16:29:25and describe an epic and when to use it.
- 16:29:28So, what is a user story? Simply put, a
- 16:29:32user story represents a piece of
- 16:29:35business value that the team can deliver
- 16:29:38within a done increment. We used to call
- 16:29:40these requirements, but user stories are
- 16:29:42so much more. Requirement is usually I
- 16:29:44need this, I need that. But a user story
- 16:29:46includes who is it for? What do they
- 16:29:49need? But very importantly, why do they
- 16:29:52need it? What is the business value that
- 16:29:54they get out of getting this feature or
- 16:29:56function?
- 16:29:59So stories should contain a good
- 16:30:01description of the business value. What
- 16:30:03it is, who needs it, what is the value
- 16:30:05that we get out of that story. Then I
- 16:30:08like to have any assumptions and any
- 16:30:11details documented in the story.
- 16:30:13Sometimes you know they're assumptions.
- 16:30:14You're doing a story uh and it needs
- 16:30:16some kind of persistence and you know
- 16:30:18you're going to use a relational
- 16:30:19database. Put that in there to give the
- 16:30:21developer a hint. Hey, don't go looking
- 16:30:22for NoSQL databases. We decided we're
- 16:30:25going to use a relational database. So
- 16:30:26anything you know any assumptions we're
- 16:30:29going to provision something in the
- 16:30:30cloud put that in the user story to so
- 16:30:33the develop developer knows what your
- 16:30:34intentions are and then most important
- 16:30:38you need the definition of done some
- 16:30:40acceptance criteria how do I know when
- 16:30:43this story is complete when it is done
- 16:30:45you don't want to find out at the sprint
- 16:30:46review that the uh the product owner
- 16:30:48says hey that's not what I wanted you
- 16:30:51want to document the definition of done
- 16:30:52to say well this is the definition we
- 16:30:54agreed on this is what the story does.
- 16:30:57And if it's not what you want, we can
- 16:30:58write another story. But we did what
- 16:31:00this said it should do.
- 16:31:03So the story description, what do you
- 16:31:05put in that description? Um, again, you
- 16:31:08want to document a persona requesting
- 16:31:10some functionality to get some goal,
- 16:31:13right? Achieve some goal, get some
- 16:31:14business value. And so the way that we
- 16:31:16do this is with this following syntax as
- 16:31:20a role. What's the role? Is it uh the
- 16:31:22marketing manager? Is it the customers?
- 16:31:24Is it the CIS admin? Right? Who is this
- 16:31:26for? And then I need some functionality.
- 16:31:29What is it that they need? This is the
- 16:31:31meat of the user story. But very
- 16:31:33importantly, so that I gain some
- 16:31:36business benefit. What is the benefit of
- 16:31:38delivering that function when we go back
- 16:31:41and we prioritize the backlog? We're
- 16:31:44going to look at the business value as
- 16:31:46one of the criteria to say should this
- 16:31:48be high in the backlog or lower in the
- 16:31:50backlog. So it's very very important not
- 16:31:53only to have what it is but what's the
- 16:31:55value that we get out of it.
- 16:31:58Then there's assumptions and details. So
- 16:32:00anything that you know right it doesn't
- 16:32:01have to be in a great detail but
- 16:32:03anything you know as I said you know if
- 16:32:05you know that you're going to use a
- 16:32:06database some persistence you know just
- 16:32:09list it there. Anything you talked about
- 16:32:10while you're writing the story put that
- 16:32:12in. What you're trying to do is help the
- 16:32:14developer understand what needs to be
- 16:32:17done. anything that wasn't obvious to
- 16:32:19get this story completed.
- 16:32:21And then there's the acceptance
- 16:32:23criteria, the definition of done. This
- 16:32:27is critically critically important.
- 16:32:29Really important to understand what
- 16:32:32makes this user story finished, complete
- 16:32:34or done. And for that we use a syntax
- 16:32:37called Girkin. Um named after the
- 16:32:40pickle. Uh and but Girkin is a syntax
- 16:32:43that makes it easy for stakeholders,
- 16:32:45customers and developers alike to
- 16:32:48describe the definition of done to
- 16:32:50describe the behavior of the system. And
- 16:32:52it goes something like this. Given some
- 16:32:55precondition, this sets up the story.
- 16:32:58Given I have five items in my shopping
- 16:33:00cart, right? Uh given I'm already logged
- 16:33:02into the system, given whatever the
- 16:33:04given is, it sets up the story. And then
- 16:33:07what's the action that happens, right?
- 16:33:09What is the thing that triggers it? When
- 16:33:11this happens, when I add another item to
- 16:33:13my cart or I delete an item to my cart
- 16:33:16and then finally, what is the testable
- 16:33:18result of that? Then I should see this,
- 16:33:21I shouldn't see that, I should have six
- 16:33:22items in my cart or I should see four
- 16:33:24items in my cart. Right? It makes it
- 16:33:27very easy for everyone to understand
- 16:33:29given this is the uh is the base case
- 16:33:32when this happens then I should have
- 16:33:34some measurable outcome and if I measure
- 16:33:36that outcome the story is done.
- 16:33:39So let's look at a sample story as a
- 16:33:42marketing manager. Now we know the role.
- 16:33:45This is not for the customer. This is
- 16:33:47not for the uh the CIS admin. This is
- 16:33:49for the marketing manager. So we know
- 16:33:51who is going to gain some benefit from
- 16:33:53this. I need a list of customer names
- 16:33:56and emails. So now we know what the
- 16:33:58function is. They need to list out
- 16:33:59customers with their emails. And then
- 16:34:02the business value so that I can notify
- 16:34:04them of marketing promotions. Now I can
- 16:34:07say how important is it to notify
- 16:34:09customers of marketing promotions and
- 16:34:11maybe I put that before another story
- 16:34:13that is less important. So now I've
- 16:34:15captured who is it for? What is it that
- 16:34:17I need and why do I need it? What value
- 16:34:20do I get from it? Then I like to put in
- 16:34:22any assumptions. These assumptions help
- 16:34:24the developer right in creating the code
- 16:34:27that goes with the story. So one
- 16:34:29assumption is we maintain customer
- 16:34:31emails. Maybe we don't. Maybe this story
- 16:34:34has a dependency on another story that
- 16:34:35actually creates the customer emails.
- 16:34:38Maybe there's another assumption.
- 16:34:39Customers have opted in to promotions.
- 16:34:42That's kind of important. Somebody might
- 16:34:44not have thought of that. Hey, we can't
- 16:34:45just email all our customers. We have to
- 16:34:47allow them to opt into getting
- 16:34:49promotions.
- 16:34:50And then we have the acceptance
- 16:34:52criteria. What is the definition of
- 16:34:54done? What is the behavior that we want
- 16:34:57this story to have? and we'll use that
- 16:34:59Girkin syntax given there are 100
- 16:35:02customers in the database. So that sets
- 16:35:04up the scenario
- 16:35:06and 90 have opted into email promotions.
- 16:35:10So this is critically important. It's
- 16:35:12not just all hundred, it's the hundred
- 16:35:13that have opted in to email promotions.
- 16:35:16So now developers know they need to
- 16:35:18filter how many customers in the
- 16:35:19database by who has opted in when I
- 16:35:23request a customer email list. So that
- 16:35:25is the action. That is the thing that
- 16:35:27happens. Then I should see a list of 90
- 16:35:30customer emails, not 100 customer
- 16:35:32emails, 90 customer emails cuz only 90
- 16:35:35opted in to the email promotion. So you
- 16:35:38can see that this is something you could
- 16:35:40give to a stakeholder. The marketing
- 16:35:41manager could understand the behavior
- 16:35:43and say, "Yep, that is the behavior I
- 16:35:44want." The developer can read this and
- 16:35:46say, "Yep, that's the behavior I can
- 16:35:48deliver." And that at the end of the
- 16:35:50sprint, as long as when you ask for
- 16:35:52customers, you only get the ones who
- 16:35:54have opted in, that is the definition of
- 16:35:56done. And so there's no arguments about
- 16:35:58whether the story is done or not. If it
- 16:36:00has that behavior, it's done. I'm not
- 16:36:03much for acronyms, but Bill Wake has a
- 16:36:06pretty good one with Invest.
- 16:36:08Invest says story should be independent.
- 16:36:10I want to be able to rank them in the
- 16:36:12backlog. I want to be able to move them
- 16:36:13around. I want to be able to uh uh say
- 16:36:16that this one comes before that one.
- 16:36:18Now, I know they can't always be
- 16:36:19independent. Sometimes there are
- 16:36:20dependencies, right? In the previous
- 16:36:22example, we had an assumption that there
- 16:36:24were customer emails in the database.
- 16:36:26And if there weren't, then that wasn't
- 16:36:28an independent story. It was dependent
- 16:36:30on the story that put emails in the
- 16:36:31database. But you, for the most part,
- 16:36:33you want to try to write them so that
- 16:36:34they're independent. They also need to
- 16:36:36be negotiable, right? I'm going to move
- 16:36:38them in the backlog. I'm going to rank
- 16:36:40them higher or low lower. Uh maybe I'm
- 16:36:42going to say we should put more value,
- 16:36:43more functionality or less functionality
- 16:36:45to negotiate how much really has to be
- 16:36:47done. So they should be negotiable. They
- 16:36:49shouldn't be too tightly uh coupled to
- 16:36:52exactly what's needed. Uh and then they
- 16:36:54need to be valuable, right? I need to be
- 16:36:56able to say how valuable is this story?
- 16:36:58What is what value does the customer get
- 16:37:00out of it? Uh to make sure that it
- 16:37:02really is a user story and uh and not
- 16:37:04just a technical debt story that this is
- 16:37:07something I need to do that the customer
- 16:37:08never sees. It needs to be estimable. I
- 16:37:11need to be able to estimate it. How big
- 16:37:13is it? Small, medium, large. There has
- 16:37:15to be enough information in there that I
- 16:37:17could say, "Wow, this is a really big
- 16:37:19story given everything that's in here,
- 16:37:20right? And it's not just one line that
- 16:37:22looks simple, but then really becomes
- 16:37:24hard." Uh, and it should be small. You
- 16:37:28want it to be something that someone can
- 16:37:29work on in a sprint. So, it's got to be
- 16:37:31smaller than a sprint. And then finally,
- 16:37:33it needs to be testable. I need to be
- 16:37:35able to test whether that story is done.
- 16:37:37And I want to test the definition of
- 16:37:38done for that story. And so stories need
- 16:37:40to be testable.
- 16:37:44What about really big ideas? Well,
- 16:37:47really big ideas are called epics. We
- 16:37:50use epics anytime that we have a story
- 16:37:53that is bigger than a single sprint
- 16:37:55because a story must be smaller than a
- 16:37:57sprint by definition. And so when it's
- 16:37:59bigger, that becomes a big idea that we
- 16:38:01can't get done in a sprint. So we make
- 16:38:03an epic and then we add smaller stories
- 16:38:06that make up the epic to the epic. So an
- 16:38:08epic in the hierarchy is higher than a
- 16:38:10story. Stories are consumed by epics. Um
- 16:38:14and so usually any story that's too big,
- 16:38:17we make it epic, right? If we can't
- 16:38:19estimate it on its own, then we break it
- 16:38:20down to smaller things that we can
- 16:38:22estimate. So when do we use an epic?
- 16:38:26Well, clearly when a story is too large
- 16:38:27to put in a sprint, then we make it an
- 16:38:30epic. Usually backlog items will start
- 16:38:32out as big ideas, right? They're they're
- 16:38:34going to they're going to be uh uh very
- 16:38:36large and so they start out as epics and
- 16:38:39then as we refine the backlog uh we make
- 16:38:41them smaller and smaller stories that we
- 16:38:43can put in a sprint. And so for sprint
- 16:38:45planning, you want to break all of those
- 16:38:47big stories up into smaller stories.
- 16:38:50Break up all those epics into smaller
- 16:38:51stories. Things that usually come in the
- 16:38:53new issues, sometimes those are epics,
- 16:38:55right? Somebody asks for a feature, a
- 16:38:57function. It sounds pretty simple, but
- 16:38:59it's going to take more than one sprint.
- 16:39:00And so, you put it in as an epic, and
- 16:39:02then you break it down into user stories
- 16:39:04later.
- 16:39:07In this video, you learn that a user
- 16:39:09story documents a persona requesting a
- 16:39:11function to achieve a goal. Using a
- 16:39:14template helps ensure stories are
- 16:39:16complete. Defining done helps minimize
- 16:39:19misunderstandings,
- 16:39:20and well-formed stories will meet the
- 16:39:22criteria of the invest acronym. And
- 16:39:25epics can be used to capture big ideas.
- 16:39:29[Music]
- 16:39:40After watching this video, you'll be
- 16:39:42able to define story points, describe
- 16:39:45considerations for assigning story
- 16:39:46points, and estimate story points on a
- 16:39:49relative scale.
- 16:39:52So, what are story points? Story points
- 16:39:55are a metric used to estimate the
- 16:39:57difficulty it is to deliver and
- 16:39:59implement a user story. The key thing is
- 16:40:02that this is an abstract measure and
- 16:40:05that's what people get hung up on.
- 16:40:06People have a hard time dealing with the
- 16:40:08abstractness of it. But it's very very
- 16:40:10important that you understand this so
- 16:40:12that you don't fall into one of the anti
- 16:40:14patterns.
- 16:40:16So what goes into that estimate? Well,
- 16:40:18there's a couple of components. First is
- 16:40:20the effort, right? How hard uh is it to
- 16:40:23do? Then there might be uh the
- 16:40:25complexity, right? Is it very complex?
- 16:40:27Is it very easy? You could have a lot of
- 16:40:29effort for something that's easy to do,
- 16:40:30but it's just boring and laborious and
- 16:40:32and you have to go off and do it. It
- 16:40:34might not be very complex. But then
- 16:40:36there's uncertainty. Have you ever done
- 16:40:38this before? Right? Maybe if you've
- 16:40:39never done it before, you rate the story
- 16:40:41points a little bit higher because
- 16:40:42there's more uncertainty. You really
- 16:40:44don't know how complex it is. So, it's a
- 16:40:46trade-off between what you know and what
- 16:40:48you don't know. So, traditionally,
- 16:40:50humans are really, really bad at
- 16:40:53estimating wall clock time. Remember, we
- 16:40:56love to see those dates go wishing by.
- 16:40:58We commit to something and then we miss
- 16:41:00it, right? And then we learn that the
- 16:41:02only thing that takes 30 minutes is 30
- 16:41:04minutes. Everything else takes longer.
- 16:41:06So, it's really, really difficult for
- 16:41:08humans to say, "This is going to take an
- 16:41:10hour. This is going to take, this is
- 16:41:11going to take a week." And so, we don't
- 16:41:13do that. If we're not very accurate at
- 16:41:15predicting that way, let's not predict
- 16:41:17that way. So instead we use t-shirt
- 16:41:20sizes. Story points are t-shirt sizes.
- 16:41:23Is it a medium story, a small story, a
- 16:41:26large story, an extra-large story? We
- 16:41:28just want to give a relative value of
- 16:41:30how big this thing is so that we can
- 16:41:33just compare it with other things that
- 16:41:34are in the current sprint. But because
- 16:41:37we can't add up SML and get a number and
- 16:41:40we want to use numbers to track
- 16:41:41velocity, which is something uh the
- 16:41:43number of story points that we can do at
- 16:41:45a sprint, most tools will use a
- 16:41:48Fibonacci sequence. I never use all of
- 16:41:51the numbers in the sequence. What I
- 16:41:52recommend is five is a medium and three
- 16:41:55is a small and eight is a large. Maybe
- 16:41:5713, you know, is an extra large. And I
- 16:42:00don't go much beyond that, right? Um you
- 16:42:02can use the entire sequence. That's
- 16:42:04fine. But don't get too granular.
- 16:42:06Remember humans are not really good at
- 16:42:08doing this kind of estimation. So we
- 16:42:11want to keep it abstract. So how do I
- 16:42:13make it abstract? Well, you have to
- 16:42:15agree what medium means, right? Since
- 16:42:18the story points are relative, you all
- 16:42:20agree on okay, this is medium. So we say
- 16:42:22medium is a five and this is what a five
- 16:42:25story is. And then we could take the
- 16:42:27other stories and then we could say
- 16:42:29evaluate from there. Is this one smaller
- 16:42:31than that story? Is it larger than that
- 16:42:33story? is the same size as that story.
- 16:42:36So, here is how I learned story points.
- 16:42:39If you're asked how tall are these
- 16:42:41buildings, um you might try to count the
- 16:42:43floors. Every floor is about 20 25 ft.
- 16:42:46Little back of the napkin. But what if I
- 16:42:48said to you, "Hey, this store, this
- 16:42:50building is a five. How big is this the
- 16:42:53building next to it, just to the left of
- 16:42:55it?" You say, "Well, that one's probably
- 16:42:57a three. If that one's a five, that
- 16:42:58one's a three. Well, how about the one
- 16:43:00uh to the right of it that's a little
- 16:43:02bit taller? Yeah, maybe that one's an
- 16:43:03eight and then maybe the largest one is
- 16:43:05a 13. It's just relative sizes. You're
- 16:43:08just saying if this story is medium or
- 16:43:10this story is small, is the other story
- 16:43:11bigger? Is it larger? And so that's how
- 16:43:14I learned to do um and to kind of
- 16:43:16rationalize what are story points. It's
- 16:43:18just relative. They're all relative to
- 16:43:20something the team does.
- 16:43:23So what should be a size of a story?
- 16:43:26Well, the story should be small,
- 16:43:28relatively small. hopefully something I
- 16:43:30could do in a couple of days, right? You
- 16:43:32don't want to make them too big. You
- 16:43:34want to make them drag on and on and on.
- 16:43:36So, you want to keep those stories small
- 16:43:38and estimate things that are that you
- 16:43:40can hopefully get done in just a few
- 16:43:42days, right? Uh large stories should be
- 16:43:44broken down into smaller ones. So if you
- 16:43:46have a story and you say this is a 21
- 16:43:49and you decide, wow that is super duper
- 16:43:52extra large that isn't going to fit in a
- 16:43:54sprint then that has to get broken down
- 16:43:56to smaller stories and maybe some of it
- 16:43:58gets done this sprint some of it gets
- 16:44:00done next sprint and maybe we create an
- 16:44:02epic to track the fact that it's going
- 16:44:04to take multiple sprints.
- 16:44:07Now let's talk about some antiatterns
- 16:44:09because it's really important that you
- 16:44:10understand these. The first antiattern
- 16:44:13is evaluating stories on wall clock
- 16:44:16time. I see this happen all the time and
- 16:44:19it relates back to our organizational
- 16:44:22antiatterns. So I get a scrum master who
- 16:44:26didn't start out as a scrum master. They
- 16:44:28started out as a project manager and
- 16:44:30they love their gant charts. And what's
- 16:44:32a gant chart? It's wall clock time. It's
- 16:44:34dates on a calendar. And so they can
- 16:44:35only think in dates on a calendar. And I
- 16:44:38have seen scrum masters who are former
- 16:44:40project managers tell the team a one is
- 16:44:42one day, a three is three days, a five
- 16:44:44is five days or five hours or 12 hours
- 16:44:48or whatever. That is the ultimate wrong
- 16:44:50thing to do. It is not about wall clock
- 16:44:53time is just relative size. Right? So a
- 16:44:56medium might take me two to three days,
- 16:44:59maybe sometimes four days. A small might
- 16:45:01take me a day, less than a day. You just
- 16:45:03agree on kind of fuzziness about this.
- 16:45:06But never ever ever ever never tell your
- 16:45:08team that that Fibonacci sequence, those
- 16:45:11story points, they are days or they are
- 16:45:13weeks. That that is an antiattern.
- 16:45:16Humans are really bad at estimating wall
- 16:45:19clock time. Just don't do it. In this
- 16:45:23video, you learn that story points are a
- 16:45:26metric used to estimate difficulty of
- 16:45:27implementing a given user story. Story
- 16:45:30points are relative, like t-shirt sizes.
- 16:45:33You must agree on what average means.
- 16:45:35And you should never equate story points
- 16:45:38with wall clock time.
- 16:45:40[Music]
- 16:45:51After watching this video, you'll be
- 16:45:53able to define a product backlog,
- 16:45:55describe how to assemble a product
- 16:45:57backlog, and convert requirements into
- 16:45:59stories. So if we look back at the steps
- 16:46:02in the scrum process in this module,
- 16:46:04we're just going to concern ourselves
- 16:46:06with the product backlog. How do we
- 16:46:08build a product backlog?
- 16:46:12So what is a product backlog? A product
- 16:46:14backlog is all the unimplemented
- 16:46:17stories, right? Stories that are not in
- 16:46:18a sprint. They're not being worked on.
- 16:46:20They're waiting to be worked on. Um
- 16:46:23usually we back we rank this in ranked
- 16:46:25order. Now, if they've got a long
- 16:46:27product backlog, the ones at the top
- 16:46:29will be ranked a little more accurate
- 16:46:31than the ones down at the bottom. And
- 16:46:32that's okay. You only have to rank maybe
- 16:46:35the next sprint or two. And then the
- 16:46:37rest of them could be relatively
- 16:46:38unranked. But the top of the backlog
- 16:46:40should be ranked in order of business
- 16:46:42important. What's the next most
- 16:46:44important thing that we need to get into
- 16:46:46a sprint? And then the stories at the
- 16:46:50top should have more detail than the
- 16:46:52stories at the bottom. Right? Right. So,
- 16:46:53as we work on this backlog and we work
- 16:46:55on the stories, we want to get the ones
- 16:46:57at the top sprint ready, having all the
- 16:46:59detail I need. And the ones at the
- 16:47:01bottom, again, they're a little bit
- 16:47:02fuzzier. We're going to work on them
- 16:47:04later. We'll add more details later.
- 16:47:08So, we're going to go through an
- 16:47:10example. And in this example, we're
- 16:47:12going to give you some sample
- 16:47:13requirements for the service that we're
- 16:47:15building. So, what are we building?
- 16:47:17We're going to build a hit counter.
- 16:47:19We're going to be a service that counts
- 16:47:20things. So I could give the counter a
- 16:47:22name and then every time I increment it
- 16:47:241 2 3 4 and then I say how many of those
- 16:47:26do I have and it gives me back the
- 16:47:28number four. So it's just a little
- 16:47:29counting service that we use to count
- 16:47:31things to a page. Uh count whatever you
- 16:47:33want. So it's a counting service. Um now
- 16:47:37we want it to allow multiple counters
- 16:47:39eventually. So having multiple counters
- 16:47:41so we can count multiple things is one
- 16:47:43of the requirements that we have. Also
- 16:47:46the counters need to persist across
- 16:47:48restarts. So this just can't be an
- 16:47:50in-memory counter. It's going to need
- 16:47:52some kind of persistence, some kind of
- 16:47:54database so that when the system
- 16:47:55restarts and comes back up, it remembers
- 16:47:58all the counters. And then we have a
- 16:48:00requirement says, you know, I probably
- 16:48:02need to be able to reset a counter once
- 16:48:03in a while back to zero so I could start
- 16:48:05counting those things again. And so
- 16:48:07resetting a counter is another
- 16:48:09requirement that the customer has given
- 16:48:10us. So if we look at the conbon board in
- 16:48:14Zenhub, you'll see these columns.
- 16:48:16They're called pipelines for new issues,
- 16:48:18ice box, product backlog, sprint
- 16:48:20backlog, in progress, Q&A, review, Q&A,
- 16:48:23and done. And so for this exercise, we
- 16:48:27don't have to worry about anything but
- 16:48:28new issues.
- 16:48:31Let's talk about creating new stories.
- 16:48:34We've got new issues and it's empty. And
- 16:48:36so we're going to start creating the
- 16:48:38first story. Need a service for counting
- 16:48:40things. So let's go back to our story
- 16:48:43template. Remember as some role I need
- 16:48:46some function so that I gain some
- 16:48:48benefit. Let's apply this to that first
- 16:48:51story. Need a service for counting
- 16:48:53things. Well, maybe this is for the
- 16:48:55user, right? As a user, I need a service
- 16:48:58that has a counter so that I can keep
- 16:49:00track of how many times something's been
- 16:49:02done. So now we know who it's for, what
- 16:49:05is it, and what is the value that they
- 16:49:07get after it. And at this stage, that's
- 16:49:10about all I know about the story. And so
- 16:49:13I will put this story into the new
- 16:49:16issues. I'll create a new issue for this
- 16:49:18story. And so now it turns into a
- 16:49:21regular story. Let's look at the next
- 16:49:23requirement. Must allow multiple
- 16:49:25counters. Again, we go and look at who
- 16:49:28is this for? Probably still for the
- 16:49:30user. As a user, I need to have multiple
- 16:49:33counters so that I can keep track of
- 16:49:34several counts at once. Again, we know
- 16:49:37who it for. We know what they need. We
- 16:49:38know how valuable it is to them. So that
- 16:49:40as we rank the backlog we could say how
- 16:49:42valuable is it they can keep track of
- 16:49:44several at once maybe in the beginning
- 16:49:46not maybe let's just get one working
- 16:49:48right so this is all the information you
- 16:49:50need to know in order to rank this
- 16:49:52backlog later on so that becomes a story
- 16:49:55in new issues let's look at the next
- 16:49:58requirement persist counters across
- 16:50:00restarts so who is this for well maybe
- 16:50:03this one's for the service provider
- 16:50:04right maybe the service provider would
- 16:50:06be embarrassed if the service gets
- 16:50:08rebooted and they lose all the counters
- 16:50:10Uh, so maybe this one's for the service
- 16:50:11provider. I need a service to persist
- 16:50:13the last known count so that users don't
- 16:50:15lose track of their counts after the
- 16:50:17service is restarted. And we can
- 16:50:19evaluate how important that is. That's
- 16:50:22our third story. And now let's look at
- 16:50:24the fourth requirement. Counters can be
- 16:50:27reset. So we go through it again. This
- 16:50:30one might be for system administrator.
- 16:50:32Maybe we say, "Hey, only the CIS admin
- 16:50:34can reset a counter." Maybe we don't let
- 16:50:35users uh reset the counters. So, I need
- 16:50:38the ability to reset the counter so that
- 16:50:40I can redo counting from the start. The
- 16:50:42important part here is that you're
- 16:50:45saying who it's for. Specifying the role
- 16:50:48makes everyone clear who's going to
- 16:50:49benefit from this. I need says what is
- 16:50:52it they really need? And the so that
- 16:50:54says what is the business value that
- 16:50:56they're going to get out of it. So now
- 16:50:58I've got my fourth story in the backlog.
- 16:51:02Now let's move on to prioritizing the
- 16:51:04backlog. Now that I've got them in new
- 16:51:07issues, I want to decide, should I put
- 16:51:09them in the ice box or should I put them
- 16:51:11in the product backlog? What do I do
- 16:51:13with these? Remember, I said I like to
- 16:51:14use new issues as my inbox. So, now that
- 16:51:18I've got these four things in the inbox,
- 16:51:20let me go do something with them. Let me
- 16:51:22prioritize that backlog. So, I'll take
- 16:51:24the first one and say, you know what,
- 16:51:25that's kind of fundamental, right? We
- 16:51:27need to get the service running. So,
- 16:51:29that was going to go right to the top of
- 16:51:30the product backlog. Then I look at the
- 16:51:32next one and I read it, right? I need to
- 16:51:34have multiple counters and I might say,
- 16:51:36you know what, multiple counters, we'll
- 16:51:38handle that later. That's something
- 16:51:40we're going to do in the future. I'm not
- 16:51:41going to bite it off right now. Then I
- 16:51:43look at I need the service to uh persist
- 16:51:46restarts. I say it's probably something
- 16:51:48right after I get it working um I
- 16:51:50probably want to put a database behind
- 16:51:52it. So when I do my venom viable
- 16:51:54product, it might not have any
- 16:51:56persistence behind it. And then next it
- 16:51:58will have persistence. And then I look
- 16:52:00at the last one in the new issues as an
- 16:52:02administrator and say, "Yeah, I might
- 16:52:04want to be able to reset the counter
- 16:52:06right after I persist it in the database
- 16:52:08uh so that I could start counting all
- 16:52:10over again." And so what I've done is
- 16:52:12I've taken these new requirements that
- 16:52:14came in from the customer uh that which
- 16:52:16were just oneliners and I wrote them in
- 16:52:19the story syntax. I use the story
- 16:52:21template to say as a user I need right
- 16:52:24as some role I need so that I get some
- 16:52:25value and then I move them into the
- 16:52:28backlog in some kind of priority order
- 16:52:31that I think I might want to execute
- 16:52:33them. In this video you learn that a
- 16:52:36product backlog is a rank list of all
- 16:52:38unimplemented stories. Stories high
- 16:52:41ranked in the backlog should have more
- 16:52:42detail than those that are lower. and
- 16:52:45creating stories using the as a I need
- 16:52:47so that template to ensure everyone
- 16:52:50understands who it benefits and the
- 16:52:52business value it provides.
- 16:52:55[Music]
- 16:53:06After watching this video, you'll be
- 16:53:08able to explain the process of backlog
- 16:53:10refinement, describe how to run a
- 16:53:11backlog refinement meeting, and triage
- 16:53:14new issues on the conbon board.
- 16:53:17So, if we go back to the steps in the
- 16:53:19scrum process, this time we're just
- 16:53:22looking at backlog refinement. What do
- 16:53:24we do during the backlog refinement
- 16:53:26meeting?
- 16:53:28So, we're ready to have our backlog
- 16:53:30refinement meeting and do backlog
- 16:53:32refinement. So this is the process of
- 16:53:35taking the backlog and ranking it right.
- 16:53:37You want to rank it in priority order so
- 16:53:39that the most important things are at
- 16:53:41the top of the backlog. Then we break
- 16:53:44down larger stories into smaller ones.
- 16:53:46We make sure that all the stories that
- 16:53:47are near the top are small enough to fit
- 16:53:50in a sprint. And then finally we make
- 16:53:53sure the stories near the top have
- 16:53:55enough detail that a developer can just
- 16:53:57take them and start working on them once
- 16:53:59we put them in a sprint plan.
- 16:54:02Now, the backlog refinement meeting
- 16:54:04itself, who should attend? Well, the
- 16:54:06product owner is the key person. They're
- 16:54:09the person who should be writing the
- 16:54:11stories. They don't always write the
- 16:54:12stories, but the product owner has the
- 16:54:14vision and the product owner should be
- 16:54:16creating stories that the team will work
- 16:54:18on. So, they need to be there. The scrum
- 16:54:21master is another person you would
- 16:54:23invite to the backlog refinement meeting
- 16:54:25because the scrum master is going to
- 16:54:26assist the product owner in refining
- 16:54:28that backlog. And then the development
- 16:54:31team is optional. I usually like to take
- 16:54:33maybe a development lead or architect
- 16:54:35and have them in there just to answer
- 16:54:37technical questions. How hard is this?
- 16:54:39How where should we rank this? Sometimes
- 16:54:41it's not a business decision. There's
- 16:54:43technical dependencies that you need to
- 16:54:45know. I do not have the whole
- 16:54:47development team, the whole scrum team
- 16:54:49there. That would be a waste in my
- 16:54:50estimation, a waste of their time. I
- 16:54:52just want to have one or two technical
- 16:54:54people uh to help out.
- 16:54:57So what's the goal? Well, the goal is to
- 16:55:00have a ranked backlog, right? The the
- 16:55:02goal is to have this backlog, this
- 16:55:04product backlog that's ranked in order
- 16:55:05of importance. So, the thing at the top
- 16:55:07is the most important. I know a lot of
- 16:55:10product owners have trouble with this,
- 16:55:12right? Well, everything's important.
- 16:55:13They say, "Okay, but there can only be
- 16:55:16one one and one two and one three. So,
- 16:55:18what's the most important? Put that one
- 16:55:20at the top. Then the next important, the
- 16:55:22next important." It really helps you
- 16:55:24kind of focus on your business goals and
- 16:55:27what's valuable to your business.
- 16:55:30And then make sure that the story
- 16:55:32contains enough information so that
- 16:55:33developers can then take that story and
- 16:55:36put it into a sprint. You don't want to
- 16:55:38be adding detail during the sprint
- 16:55:39planning meeting. In the sprint planning
- 16:55:41meeting, which comes next, you're going
- 16:55:43to want to describe the stories and have
- 16:55:45the developers understand them. But you
- 16:55:47don't want to do a lot of typing in that
- 16:55:49meeting. So the more you can do in this
- 16:55:50backlog refinement meeting to make the
- 16:55:52story sprint ready, the better off
- 16:55:54you're going to be and the faster your
- 16:55:55planning is going to go. So if we look
- 16:55:57at our conbon board, uh we've cleared
- 16:56:00out the new issues. We've got one story
- 16:56:02in the ice box, three stories in the
- 16:56:04product backlog.
- 16:56:06So we don't have to worry about anything
- 16:56:08but those three columns for now.
- 16:56:12We've got them some things in the ice
- 16:56:14box and some things in the backlog.
- 16:56:16Wouldn't you know it, those pesky
- 16:56:18customers, they have been writing more
- 16:56:21issues. It always happens. And so,
- 16:56:24they've added a couple of new ones since
- 16:56:26we had the last backlog refinement
- 16:56:27meeting. Need the ability to remove a
- 16:56:29counter. Oops, we forgot that one,
- 16:56:31right? And deploy the service to a
- 16:56:33cloud. Somebody wants to deploy it to
- 16:56:34the cloud. Uh, and so this happens all
- 16:56:37the time. That's why it's called new
- 16:56:38issues. New things are coming in, new
- 16:56:41requirements. And so one of the first
- 16:56:43things I like to do in my backlog
- 16:56:44refinement meeting is to deal with that.
- 16:56:48I call this new issue triage. What you
- 16:56:50want to do is start with the new issue
- 16:56:53column. I know you want to refine that
- 16:56:54product backlog, but constrain yourself.
- 16:56:58Look at the new issue column. You want
- 16:56:59to make that empty, right? You want to
- 16:57:01make sure that at the end of the backlog
- 16:57:03meeting, there's nothing in the new
- 16:57:04issue column because there might be
- 16:57:06something really important that ought to
- 16:57:08be done in the next sprint. So, you kind
- 16:57:10of have to look at the new issues and
- 16:57:12understand, you know, is there something
- 16:57:13that we we might want to put right at
- 16:57:15the top of the backlog or not? Or are
- 16:57:17they things that we'll put we'll get to
- 16:57:18eventually or put them in the ice box.
- 16:57:20But it's really important. The goal is
- 16:57:22to have that new issue column empty when
- 16:57:24I do new issue triage. Right? Remember
- 16:57:26that's my inbox. I want my inbox to be
- 16:57:29emptied out at every backlog refinement
- 16:57:31meeting. So, what do we do? We take the
- 16:57:34stories from new issues and we decide,
- 16:57:36do we move them to the product backlog?
- 16:57:38Is this something we're going to do
- 16:57:40maybe in the next sprint, a sprint from
- 16:57:42now, two sprints from now, depending on
- 16:57:43how deep your product backlog is,
- 16:57:45depending on what your criteria is for
- 16:57:47putting something in the ice box as
- 16:57:49opposed to putting it in the product
- 16:57:50backlog. And if it's something I'm not
- 16:57:52going to work on for a while, then maybe
- 16:57:54I put it in the ice box and say, you
- 16:57:56know, that's a great idea. We're not
- 16:57:58it's not our top priority. I'll put it
- 16:58:00in the ice box and we'll deal with it in
- 16:58:02a future sprint. Or you might say, you
- 16:58:05know, this isn't where the this product
- 16:58:07is going. I just reject it out of hand.
- 16:58:09This is something we're never going to
- 16:58:10do. It's not in in in our wheelhouse.
- 16:58:13So, uh, you reject it. But that's what
- 16:58:15you want to do with these new issues.
- 16:58:17They're either go into the product
- 16:58:18backlog. They're longer term. You put
- 16:58:20them in the ice box or they're just not
- 16:58:23something that you feel you want to take
- 16:58:25on and then you reject them out of hand.
- 16:58:27So, now let's do this. We look at the
- 16:58:29first one. Need the ability to remove a
- 16:58:30counter. I say, you know, you know,
- 16:58:32that's something that we might do
- 16:58:34eventually, but we don't even have
- 16:58:36multiple counters yet. I don't want to
- 16:58:37remove the one and only counter. So I
- 16:58:39move that one into the ice box. Then I
- 16:58:41look at deploy service to the cloud and
- 16:58:43say, you know, maybe we should do that
- 16:58:45sooner rather than later. In fact, I
- 16:58:47want to do that before we have the
- 16:58:48ability to reset a counter. You know,
- 16:58:50once we get this deployed and we get
- 16:58:52some persistence, let's go put it up in
- 16:58:54the cloud. Right. So now I've made a
- 16:58:56decision. I have I've got that new one
- 16:58:58in the product backlog. Uh and I've got
- 16:59:00the other one in the ice box.
- 16:59:04So let's look at the workflow for
- 16:59:06backlog refinement. The product owner is
- 16:59:09taking these stories and they're putting
- 16:59:11them in the backlog in order of
- 16:59:13importance, right? Taking things that
- 16:59:14they thought weren't important that
- 16:59:16might become important and and shift
- 16:59:18them around. Uh the items we might
- 16:59:21provide estimates at this point. The
- 16:59:23reason why I would do estimates, so
- 16:59:25sometimes you save estimates until you
- 16:59:27do sprint planning because those are the
- 16:59:28real estimates for the plan. But, you
- 16:59:30know, it's kind of nice to know how many
- 16:59:32story points are in my backlog, even if
- 16:59:34it's a gross estimation. Uh, you know, a
- 16:59:37rough order of magnitude. And so,
- 16:59:39sometimes we will assign, you know,
- 16:59:41story points in the backlog. So, we kind
- 16:59:44of see how big is the backlog, how many
- 16:59:45story points are in there, and then when
- 16:59:47we put them in the plan, we refine them.
- 16:59:49We get the team to agree, was that
- 16:59:51really a medium or they might say, you
- 16:59:52know, that's really a large, but at
- 16:59:54least I get some estimate in there. So,
- 16:59:55you might want to do that. Uh and then
- 16:59:57the large vague items, they have to get
- 16:59:59split up, right? Vague items have to be
- 17:00:01clarified, large items have to be split
- 17:00:04up into smaller items.
- 17:00:06And the goal here is to make the stories
- 17:00:09what I call sprint ready, right? They
- 17:00:11are ready to put in the sprint and I
- 17:00:13don't have to spend a lot of time during
- 17:00:15the sprint planning meeting adding any
- 17:00:17details. Something may come up in the
- 17:00:19meeting where a developer might ask a
- 17:00:20question and you document that question
- 17:00:22in the assumptions. Uh but for the most
- 17:00:24part from what we know now at the
- 17:00:27backlog refinement meeting I want to
- 17:00:28make sure these are sprint ready.
- 17:00:31So let's use this complete story
- 17:00:34template. We talked about the beginning
- 17:00:36of it as some role I need some f
- 17:00:38functions so that I get some business
- 17:00:40value. But now we want to go back and we
- 17:00:42want to add acceptance criteria anything
- 17:00:44we might know and we want to add the
- 17:00:47definition of done using the girkin
- 17:00:49syntax when you know given some
- 17:00:51precondition when some event happens
- 17:00:54then I see some measurable outcome. So
- 17:00:56let's go do that. So let's take this
- 17:00:59first item on the product backlog at the
- 17:01:02top and we look at it. It says as a user
- 17:01:04story I need a service that has a
- 17:01:06counter so I can keep track of how many
- 17:01:07times something was done. You'll notice
- 17:01:09there's a couple of annotations on the
- 17:01:11side. When you open up Zenhub and you
- 17:01:13see the web page, it'll have that it's
- 17:01:16currently not assigned. It has no
- 17:01:17labels. It has no milestones. It has no
- 17:01:19estimates. That's how all the stories
- 17:01:21start out. We're going to ignore those
- 17:01:23for the moment and we're going to
- 17:01:25embellish the story a little more. So,
- 17:01:27what are some of the assumptions? Well,
- 17:01:29the assumptions need need a way to
- 17:01:30increment the counter. So, so maybe when
- 17:01:33we've got this counter, I have to be
- 17:01:34able to increment it. And maybe I want
- 17:01:36to do that in one step. Maybe I don't
- 17:01:37want to do a get and then a read and
- 17:01:39then an increment and then a put. Uh
- 17:01:41maybe I just want to have an increment
- 17:01:43function that says hey in one atomic
- 17:01:44transaction increment that counter. Um
- 17:01:47and I need a way to get the current
- 17:01:49value right. So a way to increment way
- 17:01:51to get the current value. I should be
- 17:01:53pretty good to go. So now I write my
- 17:01:55acceptance criteria given I have
- 17:01:57incremented the counter to two. When I
- 17:01:59make a call to get the counter then it
- 17:02:01should return two as the counter value.
- 17:02:03Right? And you can write a couple of
- 17:02:04these. you to think of these scenarios
- 17:02:06uh that gives the developer uh the
- 17:02:08acceptance criteria that says this is
- 17:02:10the behavior we want the counter to
- 17:02:12have. In the next video, we're going to
- 17:02:15take a look at how to add labels to our
- 17:02:17stories.
- 17:02:18In this video, you learned that it's the
- 17:02:21product owner's responsibility to
- 17:02:22maintain a groom backlog. And you start
- 17:02:25refinement by triaging new issues.
- 17:02:28[Music]
- 17:02:40After watching this video, you'll be
- 17:02:42able to add details to make your story
- 17:02:43sprint ready, identify stories that are
- 17:02:46technical debt, and rank your product
- 17:02:48backlog in preparation for sprint
- 17:02:50planning. So, the next thing I want to
- 17:02:52talk about are the labels.
- 17:02:55Labels help us visualize the work. Uh if
- 17:02:59you look at the combomb bought over here
- 17:03:01um you know you see all these nice
- 17:03:02pretty colors. Now I don't get too crazy
- 17:03:05with the colors. Too many colors it
- 17:03:07becomes meaningless. But if I've got a
- 17:03:09couple of colors that catch my eye and
- 17:03:11then I can see is there too much of that
- 17:03:13color on my board and what does it mean
- 17:03:15to me? So let's look at these labels. Uh
- 17:03:18the labels come standard in GitHub and
- 17:03:20these are the standard GitHub labels and
- 17:03:22colors. You can see I've got bugs. Bugs
- 17:03:24are red. I like that. Red means danger.
- 17:03:26You don't want a lot of bugs. Uh
- 17:03:28enhancements are this cyan color. Not
- 17:03:30bad. Help wanted is in green. So these
- 17:03:33are kind of good. I've got questions
- 17:03:34won't fix things that are invalid. And
- 17:03:36they help me visualize
- 17:03:38things about each one of the stories.
- 17:03:40But I like to add one label that
- 17:03:42surprising to me is not here. And that
- 17:03:45is technical debt down at the bottom.
- 17:03:48And I make that technical debt. I make
- 17:03:50it yellow because yellow means caution.
- 17:03:52You don't want to have too much
- 17:03:53technical debt. So, let's go back to my
- 17:03:56story and I look at it and say, you know
- 17:03:58what, this is really adding value to the
- 17:04:00customer. This is the first thing we're
- 17:04:02doing uh that's adding value and I think
- 17:04:03it's an enhancement. So, I'm going to
- 17:04:05assign the label of enhancement to this
- 17:04:08story. And then I'll save it. And when I
- 17:04:12save it, I go back to my product
- 17:04:14backlog. And notice its appearance has
- 17:04:16changed. It will change in Zenhub when
- 17:04:18you use the tool. You notice there's a
- 17:04:20little circle at there's an area at the
- 17:04:21bottom of it with a circle. That circle
- 17:04:23is going to have the story points in it.
- 17:04:24So that'll have a number pretty soon.
- 17:04:26And then I've got the little enhancement
- 17:04:28label and it's this, you know, light
- 17:04:30blue or cyan colored enhancement label.
- 17:04:32So now I could start seeing with colors
- 17:04:34how we're doing on the conbon board.
- 17:04:38Let's go take the next one, the next
- 17:04:40highest priority in the product backlog,
- 17:04:42and let's go groom that one. Uh so this
- 17:04:45one is as a service provider, I need the
- 17:04:47service to persist so that I don't lose
- 17:04:49track of the uh counter. And so what are
- 17:04:51some assumptions? Well, maybe we decide,
- 17:04:53you know what, I think we're going to
- 17:04:54use a Reddus database. It's this nice
- 17:04:56mem cache database. Uh, you know, we
- 17:04:58really don't need a relational database
- 17:05:00to keep track of a counter. Developers
- 17:05:02might not know that. So, if you know it,
- 17:05:04maybe this the architect or the lead
- 17:05:06developer said, "Hey, you know, we ought
- 17:05:07to put in there." So, whoever picks this
- 17:05:09up knows, we're just going to use Reddus
- 17:05:11and we're going to store the counter as
- 17:05:12a name value pair in a memcache
- 17:05:14database. So, anything you know about
- 17:05:17it, there's always assumptions. Document
- 17:05:19them in your stories. And then we have
- 17:05:21our acceptance criteria given I've
- 17:05:22incremented the counter to two and I
- 17:05:24restart the service then the counter
- 17:05:26should still return two. Right? So that
- 17:05:29proves that we actually have persistence
- 17:05:31behind this. And now if I go uh think
- 17:05:34about the label I might say you know
- 17:05:36what that's an enhancement right this is
- 17:05:37this is something it's better now
- 17:05:39because now you don't lose the counter.
- 17:05:41So so I'm going to say that one's an
- 17:05:43enhancement.
- 17:05:46So now when I go back to my conbon board
- 17:05:48you see that one has been modified and
- 17:05:51we'll go pick the next story deploy
- 17:05:53service to the cloud and when we open
- 17:05:54that it's like oh all we have is deploy
- 17:05:57service to the cloud because that one
- 17:05:59came from the new issues. So while I we
- 17:06:02did you know we created used the
- 17:06:03template when we created our initial
- 17:06:05stories customers stakeholders they're
- 17:06:07going to create more stories they're
- 17:06:09going to wind up in new issues they're
- 17:06:10not going to have a lot of detail in
- 17:06:12them. So deploy service to the cloud. So
- 17:06:15let's go work on this one and refine it.
- 17:06:18So as a service provider I need the
- 17:06:21service to be deployed to the cloud so
- 17:06:23that it can scale capacity with user
- 17:06:25demand. Right? Just so I know how
- 17:06:26important that is. And maybe we have
- 17:06:28some assumptions. We're going to put it
- 17:06:29in the IBM cloud and maybe deploy it as
- 17:06:31a cloud foundry app. You know, whatever
- 17:06:33you want. You're going to put it in
- 17:06:34Kubernetes and deploy it as a container.
- 17:06:37Give the developer some hints on how you
- 17:06:39want to deploy this to the cloud. And
- 17:06:41then we've got our acceptance criteria.
- 17:06:43Given I've deployed to the cloud and a
- 17:06:45customer goes to the URL, our service
- 17:06:46will be available. Right? This is all
- 17:06:48about availability.
- 17:06:50So now, what label should we uh give to
- 17:06:53this one?
- 17:06:55I'm going to say this one is technical
- 17:06:56debt because there's really no added
- 17:06:59value to the customer. Although you can
- 17:07:01argue that higher availability is
- 17:07:03customer value, but uh the customer kind
- 17:07:05of ex they expect high availability,
- 17:07:08right? Um so this is not an enhancement
- 17:07:10that the customer might recognize. If
- 17:07:12they would feel free to make it an
- 17:07:13enhancement, but uh for the sake of
- 17:07:15argument, I'm just going to make it
- 17:07:16technical debt.
- 17:07:18So that begs the question, what is
- 17:07:21technical debt? Technical debt is
- 17:07:24anything you need to do that where the
- 17:07:26customer doesn't perceive that as value,
- 17:07:28right? It's not really adding a feature
- 17:07:30to the product, but it's something you
- 17:07:32have to do. If you didn't do it, maybe
- 17:07:33everything will fall apart. Um, and so
- 17:07:35you might say it's an enhancement uh
- 17:07:37because the customer does get value out
- 17:07:38of things not blowing up, but usually uh
- 17:07:42it's anything you have to do that the
- 17:07:43customer is not perceived as kind of a
- 17:07:45customer story where they're getting
- 17:07:46value out of it. Now many people
- 17:07:49understand that you know technical debt
- 17:07:50builds up over time uh and they think
- 17:07:52it's a bad thing but sometimes it occurs
- 17:07:54naturally right sometimes there are
- 17:07:56vulnerabilities in the code uh that are
- 17:07:58external libraries that have to be
- 17:08:00patched uh and that was not your fault
- 17:08:02it was something totally out of your
- 17:08:03control so it does build up over time
- 17:08:05and it's important to pay that debt
- 17:08:07down. So let's look at some examples of
- 17:08:10what technical debt is. Uh maybe some
- 17:08:12code refactoring. So those are things
- 17:08:14where we took some shortcuts uh and now
- 17:08:16it's time to refactor the code. Um and
- 17:08:18the customer doesn't see a benefit from
- 17:08:20refactoring, but the developers because
- 17:08:22it's refactored, maybe they can add
- 17:08:24enhancements quicker. So you can always
- 17:08:26argue eventually they'll benefit. Um but
- 17:08:29you know, if you wouldn't put on your
- 17:08:31list of new features, we refactored our
- 17:08:33code, it's probably technical debt. Uh
- 17:08:36setting up and maintaining environments,
- 17:08:38customers don't care about that. You
- 17:08:39need a test environment, any kind of
- 17:08:41environment, technical debt has to be
- 17:08:43done, but you know, customer doesn't get
- 17:08:45a benefit. Changing technology like
- 17:08:47databases, we decided to go from an SQL
- 17:08:49to a NoSQL. Customer doesn't see that
- 17:08:52it's all behind the scenes. It's kind of
- 17:08:53technical debt. You know, not a bad
- 17:08:55thing. Maybe it's going to allow you to
- 17:08:56do things you couldn't do before. Um,
- 17:08:58but when you do those things you
- 17:09:00couldn't do before, those are
- 17:09:01enhancements. But just swapping
- 17:09:03databases, technical debt. As I said, if
- 17:09:05there are vulnerabilities in libraries,
- 17:09:08you've got to upgrade the libraries.
- 17:09:09You've got to retest the code. Make sure
- 17:09:11nothing broke. Technical debt. Um, so
- 17:09:13it's really, really important that you
- 17:09:15don't uh shy away from technical debt.
- 17:09:18Understand what it is. Give it a label.
- 17:09:20Make sure that you put a little bit of
- 17:09:21technical debt in every one of your
- 17:09:23sprint plans so that you're paying it
- 17:09:24down. But by having this label, you
- 17:09:27could see how many stories on the
- 17:09:28combine board are yellow with technical
- 17:09:30debt, how many are blue with new
- 17:09:32enhancements. So now you can see I've
- 17:09:34got this nice yellow label that shows me
- 17:09:37some of the stories in my backlog are
- 17:09:39technical debt. We look at the last one.
- 17:09:41Uh as a system administrator I need the
- 17:09:43ability to reset account so I can uh
- 17:09:45recount something. So now let's add some
- 17:09:48assumptions. Maybe the uh technical lead
- 17:09:50said hey you know we ought to tell the
- 17:09:52developer uh how to put this URL because
- 17:09:54it might be a little tricky. We want it
- 17:09:56to be a post to counters with a counter
- 17:09:58name and then a slashreset and that will
- 17:10:00reset the counter because there's
- 17:10:02multiple ways you could probably reset
- 17:10:03the counter, right? You could update it
- 17:10:04with a zero. You could do it lots of
- 17:10:06ways. Uh but maybe that one because you
- 17:10:08want to protect it and only have admins
- 17:10:10do it. You make it a separate endpoint
- 17:10:11that only admins get access to. And then
- 17:10:14your acceptance criteria. Given the
- 17:10:17counter has advanced to five when I call
- 17:10:19reset on the service and I request the
- 17:10:21current counter, then I should see zero
- 17:10:23return from the service. So now we have
- 17:10:26a nice understanding of how should this
- 17:10:27thing behave. We've agreed on the
- 17:10:30definition of done so that there's no
- 17:10:32questions about it when we get to uh the
- 17:10:34sprint review and they demonstrate this
- 17:10:36and that's exactly what it does. No one
- 17:10:38can argue that that is what it was
- 17:10:40supposed to do. And so now we'll assign
- 17:10:42a label and I would say that's an
- 17:10:44enhancement. Being able to reset
- 17:10:45counters is a new feature. So I'm going
- 17:10:47to go with enhancement on that one. So
- 17:10:50now back to our combine board. We've got
- 17:10:52our product backlog all refined and
- 17:10:56we've got labels so that we quickly see,
- 17:10:58hey, we've got three stories that are
- 17:10:59enhancements, one story that's technical
- 17:11:02debt. I've got this nice visual
- 17:11:04indicator. And it's okay, the ones in
- 17:11:06the ice box, they're going to be later.
- 17:11:07We we will refine those later, but the
- 17:11:09ones at the top of the product backlog
- 17:11:12have these nice labels. Uh and then
- 17:11:14maybe, you know, we can uh we'll put
- 17:11:15some um story points to them when we do
- 17:11:18the sprint planning for this goound. So,
- 17:11:20let's look at some backlog refinement
- 17:11:22tips. You should be refining the backlog
- 17:11:25every sprint. Uh, my sprints usually go
- 17:11:28from Monday to the following Friday. And
- 17:11:30about the Wednesday before the end of
- 17:11:32the sprint, I like to have a backlog
- 17:11:34refinement meeting. So, every other
- 17:11:35week, I'm refining my backlog, getting
- 17:11:38it ready for the sprint plan that I
- 17:11:39usually have on Monday mornings at the
- 17:11:41beginning of the sprint, right? Because
- 17:11:43you do your sprint retrospective and and
- 17:11:45your sprint uh review on a Friday,
- 17:11:48everyone's exhausted. they go home and
- 17:11:50then I do the sprint planning first
- 17:11:51thing Monday morning. So I usually do
- 17:11:53this on a Wednesday. Now some people do
- 17:11:55it every week and if you have a lot of
- 17:11:57uh requirements coming in you might want
- 17:11:59to do it every week but it's important
- 17:12:00that at least once a sprint you're
- 17:12:02refining this backlog to keep it
- 17:12:04healthy. Um you want to have at least I
- 17:12:07like to have two sprints worth of
- 17:12:09stories refined in the backlog. Right?
- 17:12:11So if by some miracle, right, they get
- 17:12:14done with all the stories in a sprint,
- 17:12:16they need to pull more things from the
- 17:12:17backlog, uh they could just pull them
- 17:12:19from the product backlog. But mostly I
- 17:12:21want to make sure that I don't get cut
- 17:12:22short if something happens. Um you know,
- 17:12:25I've got enough stories that are refined
- 17:12:26that I maybe I can skip a refinement
- 17:12:28meeting one week because of some delays
- 17:12:30or whatever. Um so I like to have at
- 17:12:32least two sprints worth kind of refined
- 17:12:34in that product backlog. And then the
- 17:12:36more time you spend refining these
- 17:12:39stories, the less time you're going to
- 17:12:40spend doing sprint planning. So if you
- 17:12:42can add story points, we'll do it in the
- 17:12:44sprint plan, but if you can add some
- 17:12:46some um story points during the uh the
- 17:12:49plan the backlog refinement meeting,
- 17:12:51then that's fine because it gives an
- 17:12:52idea of how big these stories are. But
- 17:12:55the more you do, the more detail you
- 17:12:57add. You don't want to be typing up
- 17:12:59stories during the splint planning
- 17:13:00meeting. It'll make that planning
- 17:13:01meeting take forever. So trust me on
- 17:13:03this one. get all that done during the
- 17:13:05backlog refinement meeting. In this
- 17:13:08video, you learn that backlog refinement
- 17:13:10is used to order the product backlog and
- 17:13:12make stories sprint ready. Technical
- 17:13:14debt is any story that does not add
- 17:13:17perceived value to the stakeholder. And
- 17:13:19the goal is to get the backlog ready for
- 17:13:21the sprint planning meeting.
- 17:13:24[Music]
- 17:13:35After watching this video, you'll be
- 17:13:37able to describe sprint planning,
- 17:13:39explain why having a sprint goal is
- 17:13:41important, describe how to run a sprint
- 17:13:43planning meeting, assign estimates and
- 17:13:46labels to stories, produce a sprint
- 17:13:48plan.
- 17:13:50In this process, we've looked at product
- 17:13:53backlog and backlog refinement, and
- 17:13:55we're now doing a sprint planning
- 17:13:58meeting, which will hopefully produce a
- 17:14:00sprint backlog.
- 17:14:02Sprint planning is the meeting in which
- 17:14:05you determine what stories are going to
- 17:14:07be in the next sprint, how much can we
- 17:14:09accomplish in the next two weeks. We do
- 17:14:12that by producing a sprint backlog.
- 17:14:16So, the sprint planning meeting, who
- 17:14:19should attend? Well, that should be the
- 17:14:21product owner, the scrum master and the
- 17:14:24development team. We don't invite
- 17:14:26stakeholders or anybody like that to
- 17:14:28this meeting. It is just the core team,
- 17:14:30the three roles in scrum. The product
- 17:14:32owner, the scrum master, and the rest of
- 17:14:35the team. When I say development team, I
- 17:14:38mean software engineers, testers, uh
- 17:14:40operations folks if you're doing DevOps,
- 17:14:43uh maybe business analysts, whoever is
- 17:14:45on the team that is building the thing
- 17:14:48that you're delivering, a crossf
- 17:14:50functional team, not just software
- 17:14:52engineers.
- 17:14:54So we have to talk about goals here.
- 17:14:56This is very very important. Each sprint
- 17:14:59should have a goal. For some reason,
- 17:15:01it's hard uh for some product owners to
- 17:15:04say what the goal of a sprint is.
- 17:15:05They're thinking, I need the whole thing
- 17:15:07done, but they've got to think, what can
- 17:15:10I get done in the next two weeks? Uh,
- 17:15:12and so it's very important that the
- 17:15:14product owner articulate the goal and
- 17:15:16then here are the stories in the product
- 17:15:19backlog that support the goal so that
- 17:15:21everybody knows why they're doing the
- 17:15:23stories and how that story is going to
- 17:15:25help us achieve whatever goal it is,
- 17:15:27whatever capability, whatever we want to
- 17:15:29add uh to the product that we're
- 17:15:32building. Uh, and so it's important for
- 17:15:34the whole team to understand this.
- 17:15:36Sometimes you're in the middle of a
- 17:15:37sprint, um, you know, and you have some
- 17:15:39questions about how to do something and
- 17:15:40you're like, okay, what was the goal?
- 17:15:42You know, am I getting off on on some
- 17:15:43tangent here on some other path? The
- 17:15:45goal was deliver this capability. Let me
- 17:15:48make sure I don't overcode it,
- 17:15:49overengineer it, and let me make sure I
- 17:15:51meet the goal of delivering whatever it
- 17:15:54is we decided to deliver to the
- 17:15:55customer.
- 17:15:57So, the mechanics of sprint planning,
- 17:16:00what the development team is going to
- 17:16:01do, and this is a development team
- 17:16:03activity, uh they're going to take
- 17:16:05stories from the top of the product
- 17:16:06backlog, and they're going to move them
- 17:16:08into the sprint backlog. Uh and they're
- 17:16:11going to do this on uh and assign story
- 17:16:13points if you haven't had story points.
- 17:16:15If you do have story points from the
- 17:16:17backlog refinement, they will check to
- 17:16:19make sure they agree with those story
- 17:16:20points because they probably didn't
- 17:16:22create them. So, the development team
- 17:16:23decides how big a story is. They're the
- 17:16:26ones that have to commit to it, right?
- 17:16:27So, they have to make sure they're
- 17:16:29comfortable with the story points.
- 17:16:30Sometimes they do a little something
- 17:16:31called planning poker, uh, where they
- 17:16:33all, you know, hold up, I think it's a
- 17:16:35three, I think it's a five, and they
- 17:16:36talk about why they think it's small or
- 17:16:38medium. And then they all agree, yep,
- 17:16:39that's a medium story. I get it. Um, so
- 17:16:42very important they agree on how big
- 17:16:44these stories are. And then, uh, they
- 17:16:46want to make sure that each story
- 17:16:48contains enough information so that they
- 17:16:50could start working on it. You don't
- 17:16:51want to be asking questions in the
- 17:16:53middle of a sprint. you want to be able
- 17:16:54to take the next story off the backlog
- 17:16:56and know that everything in it uh is
- 17:16:58there that you need to start working.
- 17:17:00And so it's important that all the
- 17:17:01developers understand, all of the
- 17:17:03testers, all everybody on the team
- 17:17:05understands what's that story about in
- 17:17:07case they're the one that pulls it off
- 17:17:08the backlog. And then finally, you stop
- 17:17:12adding stories when you hit the team's
- 17:17:14velocity.
- 17:17:16So
- 17:17:18this begs the question, what is team
- 17:17:20velocity? I've mentioned it a few times
- 17:17:22now, right? Velocity is the number of
- 17:17:24story points that a team can execute in
- 17:17:27a single sprint. Right? So, you take all
- 17:17:30the story points in the sprint and
- 17:17:31sprint and that becomes the team's
- 17:17:33velocity. Uh this is critical because
- 17:17:36it's going to change over time. As
- 17:17:38estimates get more accurate, it'll
- 17:17:39change. As the team gets more uh
- 17:17:42competent at implementing stories, it's
- 17:17:44going to change. So, the velocity could
- 17:17:46change over time. Hopefully, it will get
- 17:17:48better and better and better. But here's
- 17:17:50the key piece. You cannot compare the
- 17:17:52velocity of two teams. Velocity is a
- 17:17:55personal thing. Each team decides what's
- 17:17:58a medium, right? Uh and so a medium for
- 17:18:00one team might be bigger than a medium
- 17:18:02for another team. So it's not fair to
- 17:18:04compare their velocity. Also, some team
- 17:18:07might say, "Hey, two is a medium, one is
- 17:18:09a small, right? Three is a large."
- 17:18:12Another team might say five is a medium,
- 17:18:13three is a small, eight is a large.
- 17:18:15Well, obviously the team that picked the
- 17:18:17bigger numbers is going to have the
- 17:18:18bigger velocity, but they may actually
- 17:18:20be doing less work. So, unless all the
- 17:18:23teams agree on what a medium story is
- 17:18:25and all the teams agree on what numbers
- 17:18:27to use, which they don't always do
- 17:18:30because the teams are independent, you
- 17:18:32cannot compare the velocity of two
- 17:18:33teams. Not fair unless everybody's using
- 17:18:35the same measurements.
- 17:18:39So, one of the first things you want to
- 17:18:40do when you do sprint planning is create
- 17:18:42a milestone. Now in uh Zenhub you can
- 17:18:45use a milestone which is part of GitHub
- 17:18:48but Zenhub has just introduced something
- 17:18:50called sprints and so sprints act like
- 17:18:53the old uh milestones and you can use
- 17:18:55either. I'm still using milestones
- 17:18:57because I can still track them in other
- 17:18:59ways in GitHub. The sprints are unique
- 17:19:01to uh Zenhub but they have some cool
- 17:19:03automation where you can move stories
- 17:19:05from sprint to sprint. So you might want
- 17:19:07to look into that. But right now I have
- 17:19:09my teams creating milestones. So you
- 17:19:11create the milestone and you give it a
- 17:19:13title. I usually keep the title short
- 17:19:15because they show up in drop-own lists,
- 17:19:17right? So sprint one colon, you know,
- 17:19:20deploy to cloud, just something really
- 17:19:22short so we know what the sometimes the
- 17:19:24number is irrelevant, but we just know
- 17:19:25that sprint is uh deploy to cloud. And
- 17:19:28then we want to give it a description
- 17:19:30and the description should be the goal,
- 17:19:33right? So that everybody understands
- 17:19:35what are we doing this sprint. Look at
- 17:19:37the description of the milestone. that
- 17:19:39goal that that's what we're all uh here
- 17:19:41to do. So, make sure that we adhere to
- 17:19:43that goal. Um and then you give it a
- 17:19:45duration. And I like to have my sprints
- 17:19:47be two weeks. Some teams could do do one
- 17:19:49week. I think it's a little short, but
- 17:19:51you really don't want to go three, four
- 17:19:52or five weeks. Too many things can
- 17:19:54change. Um I like to keep two week
- 17:19:56sprints. It's a nice cadence that's easy
- 17:19:58for most teams to do.
- 17:20:01So, let's look at the user interface for
- 17:20:03creating a uh a new milestone. So, one
- 17:20:05of the things we want to do is we want
- 17:20:06to give it a title. So, I've called this
- 17:20:09sprint one colon single counter, right?
- 17:20:11We just want to implement a single
- 17:20:13counter. That should tell you right
- 17:20:14there the multiple counter story is not
- 17:20:16going to be in the sprint, right? The
- 17:20:18the the sprint is just about the single
- 17:20:19counter. And then in the description, I
- 17:20:22like to put the goal. The goal is to get
- 17:20:23a single counter working and deploy to
- 17:20:26the cloud, right? So, I've kind of
- 17:20:27stated this is what we're all running
- 17:20:29for. We want to get it in the cloud. We
- 17:20:30want to get just a single counter
- 17:20:32working, right? And this is what we're
- 17:20:33going to commit to uh to our
- 17:20:35stakeholders. And then I've got to give
- 17:20:38it some dates, a start date and an end
- 17:20:40date. And so I might say, "Yep, I'm
- 17:20:41gonna start on Monday the 7th." And then
- 17:20:43the following uh Friday the 18th is when
- 17:20:46we're going to be done with this twoe
- 17:20:48sprint. And so now I'm all ready to
- 17:20:50create that milestone. Just a title, a
- 17:20:53good description that gives you the goal
- 17:20:55and the start and end dates. So we'll
- 17:20:57create a milestone.
- 17:20:59So now if we look at where we left our
- 17:21:00combine board, we had some groomed
- 17:21:03stories in the product backlog, some
- 17:21:04ungroomed stories in the ice box, and we
- 17:21:07don't have to worry about anything but
- 17:21:08the product backlog and the sprint
- 17:21:10backlog. The goal here is to build a
- 17:21:12sprint backlog from the product backlog.
- 17:21:16So if we look at it, um, we've got our
- 17:21:18stories. They don't have any story
- 17:21:20points, so we're going to have to assign
- 17:21:21them. Notice at the top of the sprint
- 17:21:23backlog, it says zero story points. The
- 17:21:25tool will track how many story points
- 17:21:27you have in each one of the pipelines.
- 17:21:29And so that's going to tell us when we
- 17:21:31reach our team velocity. So let's look
- 17:21:34at the first story.
- 17:21:37So I open the first story and I want to
- 17:21:40assign it an estimate. And so maybe we
- 17:21:42talk it over as a team and the team says
- 17:21:44this looks like a rather large story
- 17:21:46because it's, you know, it's setting up
- 17:21:48the initial, you know, counter the
- 17:21:50increment and then getting the values. A
- 17:21:52number of things in here. Maybe they say
- 17:21:53this is a large one. and we're going to
- 17:21:55make it an eight. And then we assign it
- 17:21:57to the sprint milestone of sprint one.
- 17:21:59So now we know that this is in the
- 17:22:01sprint and it's got uh an estimate. Uh
- 17:22:03and so we'll close that one. Now when it
- 17:22:06shows up in the product backlog, it has
- 17:22:08an eight in the circle to show us that
- 17:22:10it's eight story points. We still have
- 17:22:12our label and it's also been assigned to
- 17:22:14the sprint. So now we'll move that one
- 17:22:16over into the sprint backlog. And the
- 17:22:18sprint backlog now shows us you've got
- 17:22:20eight story points in the sprint so far.
- 17:22:22So let's look at the next one. We open
- 17:22:24it up. We talk about it as a team. Is
- 17:22:26this big? Is it small? Medium, large?
- 17:22:28What is it? Maybe the team decides,
- 17:22:30"Hey, this is a medium, right? We know
- 17:22:32how to do this. This is something that
- 17:22:34we think is kind of a medium story. Get
- 17:22:36it done in a couple of days, less than a
- 17:22:38week." Um, and so that becomes a medium
- 17:22:41story. And so the next thing we want to
- 17:22:43do is assign it to the sprint. So now
- 17:22:45we've got this story assigned to the
- 17:22:47sprint. It's a medium story. We go back
- 17:22:49to our conbon board. We see that the the
- 17:22:52uh the story points have been assigned
- 17:22:54and we drag and drop that one over into
- 17:22:56the sprint backlog. And now we're at 13
- 17:22:59story points. And we'll go look at the
- 17:23:01next story. So this is what you're doing
- 17:23:02during the sprint planning meeting,
- 17:23:04right? You're looking at each one of
- 17:23:05these stories. You're talking about it.
- 17:23:07This one's a technical debt story. We
- 17:23:09talk about it with the team. The team
- 17:23:10decides this one's also a medium. We
- 17:23:12assign it to the sprint milestone. And
- 17:23:15then we save it. And that one shows up
- 17:23:18with all its decorations. and we drag
- 17:23:20and we drop that one into um the the
- 17:23:24sprint backlog. And so you continue to
- 17:23:25do this until you hit your velocity. So
- 17:23:28let's say the team's velocity is 18
- 17:23:30story points. Um and so we stop at this
- 17:23:33point and say, "Hey, we've got enough
- 17:23:35things in our sprint plan. We don't want
- 17:23:37to overcommit. The past has showed us
- 17:23:39that we can do about 18 story points."
- 17:23:41And that's the beauty of story points.
- 17:23:42It's not wall clock time. It's like, you
- 17:23:44know, we could do a couple smalls, a
- 17:23:45medium, maybe a large, or maybe two
- 17:23:47mediums and a large, right? Um, it's
- 17:23:49just it's not the number of stories
- 17:23:51every sprint. It's given the estimates
- 17:23:54and given our past track record of
- 17:23:56implementing 18 story points or 20 story
- 17:23:59points per sprint. We don't want to
- 17:24:01exceed that commitment in the next
- 17:24:03sprint.
- 17:24:05In this video, you learned that it is
- 17:24:07the product owner's responsibility to
- 17:24:09present the sprint goal. It is the
- 17:24:11development team's responsibility to
- 17:24:13create a sprint plan. And a sprint plan
- 17:24:16is created by moving stories from the
- 17:24:18product backlog into the sprint backlog
- 17:24:20until the team's velocity is reached.
- 17:24:23[Music]
- 17:24:34After watching this video, you'll be
- 17:24:36able to describe the daily workflow,
- 17:24:38determine which story you should work on
- 17:24:40next, and explain why you should not
- 17:24:42work on more than one story at a time.
- 17:24:46In the steps in the scrum process, we've
- 17:24:48gone all the way through backlog
- 17:24:50refinement and sprint, the sprint
- 17:24:51backlog, and now we are off to actually
- 17:24:55executing the sprint.
- 17:24:58So the sprint is one iteration through
- 17:25:01design, code, test, deploy, right? It's
- 17:25:03one iteration through that whole cycle
- 17:25:06and we do this in uh twoe increments and
- 17:25:09it's really important that every one of
- 17:25:11them has a goal so everyone knows the
- 17:25:12goal that they're working for.
- 17:25:15So the daily execution what each member
- 17:25:18wants to do is when they start the
- 17:25:20sprint they take the next highest item
- 17:25:23off the sprint backlog that they have
- 17:25:25the skills to work for. I realize that
- 17:25:27some UI developers can't do back-end
- 17:25:29work. That's fine. But the next item,
- 17:25:32the highest item. You don't get to pick
- 17:25:33one in the middle. You don't get to pick
- 17:25:35your favorite item. You should be doing
- 17:25:37in the order of business importance, the
- 17:25:40next highest thing on the sprint
- 17:25:41backlog. You pull it off and you assign
- 17:25:43it to yourself. Very, very important to
- 17:25:46assign it to yourself so everybody knows
- 17:25:47you're working on it. And then you move
- 17:25:49it into in progress so that now visually
- 17:25:53everybody can see that you're working on
- 17:25:55it. So let's go back to our conbon
- 17:25:57board. We see we have three stories in
- 17:25:59the sprint backlog. And so right now we
- 17:26:01don't care about anything that is to the
- 17:26:03left of the sprint backlog because we
- 17:26:05want to concentrate on the sprint
- 17:26:07backlog. What's in process? What needs
- 17:26:09to be reviewed and what is going to get
- 17:26:11done. Uh so right now for your daily
- 17:26:13execution, you're going to take the next
- 17:26:15highest thing on the sprint backlog,
- 17:26:17move it to inrocess and open it up so
- 17:26:20that you can assign it to yourself. So
- 17:26:23once it opens up, you click on the
- 17:26:25assignees. One of the cool things in in
- 17:26:27uh is that you can just click on a link
- 17:26:29that says assign yourself. Otherwise,
- 17:26:31you could drop down and assign it to
- 17:26:32someone else. Um but you want to go
- 17:26:34assign it to whoever you are in GitHub.
- 17:26:37So now I've just assigned this to myself
- 17:26:39in GitHub. Uh so I can close that story
- 17:26:42of obviously I'm going to read the
- 17:26:43story, understand what it is, understand
- 17:26:46what I have to do, uh and then go close
- 17:26:48that story. And then it shows up in the
- 17:26:51in progress column with a little avatar.
- 17:26:54happens to be the avatar that is uh you
- 17:26:56know my picture on GitHub but it's
- 17:26:58whatever your avatar is on GitHub that's
- 17:27:00what it shows up so look at what I can
- 17:27:02see here now anyone right management
- 17:27:04anyone can go look at who's working on
- 17:27:06what somebody else on my team oh look
- 17:27:09that refrano guy he's got that one in
- 17:27:12process so um I'm going to go pick the
- 17:27:14next one off the backlog assign it to
- 17:27:16myself and then go work on it
- 17:27:19so some key things to keep in mind when
- 17:27:21you're doing your daily execution nobody
- 17:27:24body should be working on more than one
- 17:27:26story at a time. That's another
- 17:27:28important feature of having those little
- 17:27:30avatars show up because if I see the
- 17:27:32same avatar, then somebody's working on
- 17:27:34multiple stories. And the problem is I
- 17:27:36can't ship 50% of two things that are
- 17:27:39incomplete. I can only ship 100% of one
- 17:27:42thing that's completed. So, I don't want
- 17:27:44people having their focus pulled too
- 17:27:46many ways. I want them to work on one
- 17:27:48thing, deliver a feature, and then go
- 17:27:49work on the next feature. Unless, of
- 17:27:51course, they're blocked. If they're
- 17:27:53blocked, then it's okay. While someone's
- 17:27:55unblocking you, like the scrum master is
- 17:27:57going to unblock you, you can start
- 17:27:58working on a new feature and then get
- 17:28:00back to the one that was blocked. Uh,
- 17:28:02when you're finished, you then go create
- 17:28:04a pull request and you move that story
- 17:28:06into review QA. And there's a way to set
- 17:28:09up pull requests on GitHub with ZenHub
- 17:28:11so that when you create a pull request,
- 17:28:13it will automatically create that pull
- 17:28:16request in review QA. And if you assign
- 17:28:19a story to that pull request, you assign
- 17:28:20a get issue to that pull request, it
- 17:28:23will pull the issue from in process over
- 17:28:26to review QA and link them together. So,
- 17:28:29it's a nice way of keeping everything
- 17:28:31neat and tidy so everyone knows a pull
- 17:28:34request has been made because now I see
- 17:28:36things in the review QA column that I
- 17:28:38should probably go off and maybe review
- 17:28:39for somebody. And then when the pull
- 17:28:42request is then merged, now you can take
- 17:28:45and drag that into the done column. Once
- 17:28:47your code has been merged with the base
- 17:28:49branch, uh the master branch or the main
- 17:28:52branch, you can then move that to the
- 17:28:54done column because you're done. And
- 17:28:55then you start all over. You go back to
- 17:28:58uh the sprint backlog, take the next
- 17:29:00highest thing off the sprint, assign it
- 17:29:02to yourself, and start working on it.
- 17:29:05In this video, you learn that you need
- 17:29:07to keep the combine board updated so
- 17:29:09that everyone knows what you're working
- 17:29:11on. It's important to always work on the
- 17:29:13story with the highest priority that you
- 17:29:16have the skills for. And working on more
- 17:29:18than one story at a time may lead to
- 17:29:20neither story being finished at the end
- 17:29:22of the sprint.
- 17:29:23[Music]
- 17:29:36After watching this video, you'll be
- 17:29:38able to describe what happens in the
- 17:29:39daily stand-up meeting. Discuss the
- 17:29:41importance of time boxing the meeting to
- 17:29:4315 minutes. Explain what to do with
- 17:29:46topics raised at the meeting and conduct
- 17:29:48a daily stand-up meeting.
- 17:29:51In the steps in the scrum process, we've
- 17:29:54gone all the way through to the daily
- 17:29:56scrum or the daily standup.
- 17:30:00So now we're learning about the daily
- 17:30:02stand-up meeting. This should happen in
- 17:30:03the same place in time every day. It's
- 17:30:06important that people don't know where's
- 17:30:07the meeting today, right? Usually it's
- 17:30:09the same place in time every day. Um,
- 17:30:12and then sometimes it's called the daily
- 17:30:14scrum. I've heard it called both. Daily
- 17:30:16scrum, daily standup. Maybe daily scrum.
- 17:30:19Scrum is kind of the whole process. So I
- 17:30:20like using the term daily standup. Uh,
- 17:30:24each member briefly discusses uh what
- 17:30:26they're working on, right? They report
- 17:30:28on their work. And this is a meeting
- 17:30:29for, you know, each other, for the team
- 17:30:31to get up to date on who's working on
- 17:30:33what. Is anybody stuck? Now, it's called
- 17:30:36a standup because you're supposed to
- 17:30:38stand up. Nobody should be sitting down.
- 17:30:40This is a 15minute time box meeting.
- 17:30:43Very, very critical that it only takes
- 17:30:4415 minutes. One of the ways of ensuring
- 17:30:46that is to have everybody stand up,
- 17:30:49right? Usually, they'll stand in a
- 17:30:50circle and just go around and and
- 17:30:52discuss. Um, so that's why it's called a
- 17:30:55stand-up meeting. Now, it's not a
- 17:30:57project status. This is really critical.
- 17:30:59I've seen these devolve into projects.
- 17:31:01It's not a status meeting. It's a
- 17:31:03meeting for all of the development team,
- 17:31:05right? The software engineers, the
- 17:31:07testers, anybody on the team to
- 17:31:09understand who's working on what. Um,
- 17:31:11and what are we going to get done today?
- 17:31:13And can I help anybody? Um, so 15
- 17:31:16minutes answer some simple questions.
- 17:31:19And so who should attend? Well, uh, the
- 17:31:22scrum master should attend. The scrum
- 17:31:23master is someone who, uh, you know, is
- 17:31:25helping the team, um, be agile. If you
- 17:31:28have an advanced team, you might say
- 17:31:30they uh show up without the scrum
- 17:31:31master, but the scrum master is critical
- 17:31:33because if anyone's blocked, I want the
- 17:31:35scrum master to unblock them. So, I
- 17:31:37always have the scrum master uh attend
- 17:31:39the daily standup. And then, of course,
- 17:31:41the development team, right? Everybody
- 17:31:42on the scrum team uh is attends the
- 17:31:45standup. Now, the product owner is
- 17:31:47optional. I've had product owners show
- 17:31:49up some days, not show up others. If
- 17:31:51they do show up, they are not to speak
- 17:31:53unless spoken to. This is not a status
- 17:31:57meeting for the product owner. This is
- 17:31:59really really critical and I and I see
- 17:32:01how these things dee evolve right into
- 17:32:03daily status meeting. It's not a status
- 17:32:05meeting. So the product owner can show
- 17:32:07up if they can be helpful in answering a
- 17:32:09question fine. They don't get to ask
- 17:32:11questions. They don't get to drill the
- 17:32:12team. That is not what this meeting is
- 17:32:14for. They can have their own status
- 17:32:16meeting if they want to do that. That's
- 17:32:17not what the standup is for. The standup
- 17:32:19is for the development team. Product
- 17:32:21owner is optional.
- 17:32:24So what are these questions that
- 17:32:25everyone asks? So each member answers
- 17:32:28these three questions in turn. What did
- 17:32:31I get done yesterday? What am I going to
- 17:32:33work on today? And are there any
- 17:32:35blockers? Are there any impediments in
- 17:32:37my way? So everyone knows what I've been
- 17:32:40working on. Um I worked on something
- 17:32:42yesterday. I plan to continue it today.
- 17:32:44I might get finished tomorrow. I'm gonna
- 17:32:45plan to continue it today. Or I worked
- 17:32:47on this yesterday. I'm going to pick up
- 17:32:48a new story today. Nothing's blocking
- 17:32:51me. or something is blocking me. Very
- 17:32:53very important impediments and blockers.
- 17:32:56If one of the team members is being
- 17:32:58blocked, the scrum master has nothing
- 17:33:00more important than to unblock them.
- 17:33:02Right? Critically important that you
- 17:33:04keep the team moving forward. Uh and so
- 17:33:06that's why the scrum master needs to be
- 17:33:08at this meeting so that if anybody's
- 17:33:10blocked, they can go deal with it while
- 17:33:12they do some productive the like the
- 17:33:14team members do more productive work
- 17:33:15taking another story off the backlog.
- 17:33:18Uh yeah. So developers who are blocked,
- 17:33:20take the next story off the black
- 17:33:22backlog and start working on it while
- 17:33:23you're blocked. Unless you're going to
- 17:33:24get unblocked in an hour or two, uh, you
- 17:33:26know, then maybe go so work on some
- 17:33:28other work. Um, but if the blocker is
- 17:33:30going to be around for a while, start
- 17:33:32working on the next story.
- 17:33:34So let's talk about table topics. And
- 17:33:37this is why I see these meetings running
- 17:33:39over the 15minute time box. Anything
- 17:33:42that comes up that is not part of the
- 17:33:45three questions should be tabled, right?
- 17:33:47And we we sometimes we say we put that
- 17:33:49in the parking lot. Um so it's very very
- 17:33:52important that the scrum master write it
- 17:33:53down so we don't forget. We don't want
- 17:33:55to lose track of it. We're not trying to
- 17:33:56be rude, but we want to get through this
- 17:33:58meeting in 15 minutes reporting on those
- 17:34:00uh three questions. And then if anybody
- 17:34:04is interested in the table topics, we
- 17:34:06then do those after the meeting. So I'll
- 17:34:08have the 15-minute scrum meeting and
- 17:34:09then say, "Okay, the following topics
- 17:34:11came up. Anybody who's interested in
- 17:34:13discussing them, please stay. everybody
- 17:34:15else go have a productive day and then
- 17:34:17you can talk about those topics. Maybe
- 17:34:19somebody needed help and someone else
- 17:34:20says, "I know how to do that. I can tell
- 17:34:22you how." Tell them after the meeting.
- 17:34:25In this video, you learned that the
- 17:34:27daily standup occurs every day for 15
- 17:34:29minutes. Each person should be prepared
- 17:34:32to answer the three stand-up questions.
- 17:34:35The daily standup is not a status
- 17:34:37meeting.
- 17:34:38Topics not related to the standup should
- 17:34:41be addressed after the meeting.
- 17:34:43[Music]
- 17:34:54After watching this video, you'll be
- 17:34:56able to define a burndown chart,
- 17:34:58describe how to read a burndown chart,
- 17:35:00and explain how burndown charts can help
- 17:35:02forecast the team's ability to achieve
- 17:35:04the sprint goal.
- 17:35:06So, a burndown chart is one of my
- 17:35:09favorite charts. which is a tool that I
- 17:35:10use a lot because it lets me quickly and
- 17:35:12easily see is the team going to reach
- 17:35:15their sprint goal. It works off of
- 17:35:17milestones, although now with the new
- 17:35:19Zenhub, it also works off of sprints.
- 17:35:21Um, but a milestone could be anything,
- 17:35:23right? A milestone could be a demo that
- 17:35:25you're going to do or you're going to go
- 17:35:26to a conference uh and the milestone is
- 17:35:28to get the code ready. Uh, but usually
- 17:35:30milestones are your sprints, right? Your
- 17:35:33twoe sprints. And so these burndown
- 17:35:35charts could be used to measure progress
- 17:35:37against any milestone, not just sprints.
- 17:35:42So what they are is a measure of how
- 17:35:44many story points are completed versus
- 17:35:47how many story points you have in the
- 17:35:49sprint given time. So it's going to show
- 17:35:52you that given this amount of story
- 17:35:54points and this amount of time, you
- 17:35:56should be here. And you want to make
- 17:35:58sure that you're on that line. You'll
- 17:35:59see what they uh what they look like. uh
- 17:36:02over time the story points remaining to
- 17:36:03go go down, right? So so there's less
- 17:36:06and less story points to uh to execute
- 17:36:08and that's why they call it a burndown
- 17:36:09chart. You're watching the story points
- 17:36:11left, the story points remaining burning
- 17:36:14down over time. So let's take a look at
- 17:36:17an example burndown chart. On the
- 17:36:20vertical I have the number of story
- 17:36:21points in the sprint. And so this will
- 17:36:24be different for every sprint and
- 17:36:25clearly for every team. It's the number
- 17:36:27of story points in this particular
- 17:36:29milestone which is a sprint. Then on the
- 17:36:31horizontal I have the number of days in
- 17:36:33a sprint and this is a twoe sprint. And
- 17:36:36then I have vertical bars that indicate
- 17:36:38the weekends. Now this particular sprint
- 17:36:40is going from a Wednesday to a
- 17:36:41Wednesday. Otherwise you would see it
- 17:36:43start out with the vertical bars in the
- 17:36:45beginning. Uh and then it plots the
- 17:36:48optimal path through the burndown. So
- 17:36:52everything being equal and if you're
- 17:36:54burning down uh on an equal basis, you
- 17:36:56will burn down to the first weekend. and
- 17:36:58it doesn't assume that people are
- 17:36:59working on weekends. You do not want to
- 17:37:01burn out your team. Um, and then it
- 17:37:04plots the next course from that week and
- 17:37:06then the final burndown at the end. And
- 17:37:09then as the team starts working, you'll
- 17:37:11see this blue line. Now, every dot on
- 17:37:14that blue line is a closed story or you
- 17:37:17can set it to be a done story move to
- 17:37:19the done column. But each one of those
- 17:37:21is a story that has been completed in
- 17:37:24some way. And so we're looking pretty
- 17:37:26good right up until now, up until about
- 17:37:27halfway through. And then we continue.
- 17:37:30And then, wow, something's going on
- 17:37:32here. Right. So now I see that the
- 17:37:34number of stories closed is much higher
- 17:37:36than they need to be in order to make
- 17:37:38this sprint. And so the team rallies uh
- 17:37:41gets a bunch of stories completed. And
- 17:37:43then finally, we do make our date. We
- 17:37:45get them all completed before the end of
- 17:37:47the sprint. So it's just very quick.
- 17:37:49It's very easy to read. Um it's very
- 17:37:52simple for developers. And again, this
- 17:37:54is not necessarily for management. This
- 17:37:56is for the development team to
- 17:37:57understand, are we going to meet the
- 17:37:59sprint goals? Are we going to get all
- 17:38:00the stories done in time? This is a
- 17:38:02pretty good indication. It's why I like
- 17:38:04these charts.
- 17:38:06In this video, you learn that a burndown
- 17:38:08chart shows the measurement of story
- 17:38:10points completed versus story points
- 17:38:12remaining for a sprint. Burndown charts
- 17:38:15can be used to show progress towards any
- 17:38:17milestone, not just sprints. Burndown
- 17:38:20charts are used to forecast the team's
- 17:38:22probability of achieving the sprint
- 17:38:24goal.
- 17:38:25[Music]
- 17:38:37After watching this video, you'll be
- 17:38:39able to describe what a sprint review
- 17:38:40is, explain who to invite to a sprint
- 17:38:43review meeting, and describe how to
- 17:38:45conduct a sprint review meeting.
- 17:38:47So, we've been through all of the steps
- 17:38:49in the scrum process through the sprint
- 17:38:51and now hopefully we've got a valuable
- 17:38:54product, a valuable done increment to
- 17:38:56demonstrate.
- 17:38:59The sprint review meeting is demo time.
- 17:39:02That's when the developers get to show
- 17:39:04up all the great work that they did. You
- 17:39:06want to have live demonstrations of
- 17:39:08here's the feature we added, here's what
- 17:39:09it does, what do you think about it? And
- 17:39:11then the product owner goes off and
- 17:39:13says, "Yep, that's what we wanted." or
- 17:39:15maybe, hey, that's really cool. What if
- 17:39:17we did this? Maybe write a new story for
- 17:39:19it. Um, but they're determining based on
- 17:39:21the acceptance criteria. Is this
- 17:39:23acceptable? And then all of the stories
- 17:39:25that are accepted get moved from the
- 17:39:27done column into the closed column
- 17:39:29because now everyone agrees that story
- 17:39:31can be closed. We've delivered that
- 17:39:33functionality.
- 17:39:35So, who should attend this meeting?
- 17:39:37Well, everybody, the product owner, the
- 17:39:40scrum master, the developers, the
- 17:39:42stakeholders, the customers, anybody you
- 17:39:45can think of, right? Anybody who wants
- 17:39:47to see a demo uh can come to this
- 17:39:49meeting. This is the this is the time
- 17:39:51when the developers really shine, right?
- 17:39:53When the development team uh gets to
- 17:39:55show off all their stuff. So, everyone
- 17:39:57is welcome to this to the sprint review
- 17:39:59meeting to see how they've been working
- 17:40:01on this increment.
- 17:40:04So let's talk about the sprint review.
- 17:40:07Feedback should be converted into
- 17:40:09backlog items. So you what you want to
- 17:40:11do in the sprint review is get feedback
- 17:40:13from the stakeholders, feedback from the
- 17:40:15product owner, feedback from everyone
- 17:40:16watching the demo, and then decide well
- 17:40:19maybe we should write new stories based
- 17:40:21on this feedback to add some new
- 17:40:23functionality or take it in a different
- 17:40:25direction or whatever. Um, so this is
- 17:40:27where iterative development allows you
- 17:40:29to build things you could not have built
- 17:40:31before because quite often once they see
- 17:40:34something, right, once a stakeholder
- 17:40:36sees something like, "Oh, now that I've
- 17:40:38seen that, you know, would be great if
- 17:40:40we could just add another one of these."
- 17:40:42And they would have never thought of it.
- 17:40:44It would have never happened in
- 17:40:45waterfall development because that
- 17:40:47process wouldn't have spurred their
- 17:40:48interest. Um and and uh this is really
- 17:40:51really where you build products that you
- 17:40:53could not have built with just using a
- 17:40:55fixed planning method. This is where
- 17:40:57iterative planning really thrives.
- 17:41:01So what do you do about rejected
- 17:41:03stories? What do you do about stories
- 17:41:04that the product owner says, "No, that
- 17:41:06wasn't that wasn't what we wanted at
- 17:41:08all." Well, any story that is not
- 17:41:10considered done, you have to treat
- 17:41:12carefully. I want to make sure that you
- 17:41:14don't just move them to the next sprint.
- 17:41:16What I usually do is I add a label to
- 17:41:18them to let them know it's unfinished or
- 17:41:20it's done or it was inaccurate or
- 17:41:21whatever and then I close it. Why do I
- 17:41:25close it? I close it because I don't
- 17:41:27want to affect my velocity uh impact my
- 17:41:30velocity necess unnecessarily. So I open
- 17:41:33a new story with whatever it is they
- 17:41:35really did want and I close that one.
- 17:41:37And this is really key to make sure that
- 17:41:40you know if you had eight story points
- 17:41:42and the developers, you know, put eight
- 17:41:44story points into it and you just move
- 17:41:46it to the next sprint, well, you just
- 17:41:48lost eight story points out of your
- 17:41:49velocity, but your velocity is no longer
- 17:41:51accurate because you did take time to do
- 17:41:54eight story points. So instead of 18,
- 17:41:55you did 10. It's like, well, what
- 17:41:57happened that sprint? It's not that they
- 17:41:59didn't do any work. It's that the work
- 17:42:01wasn't accepted as what the product
- 17:42:03owner wanted. But you still want that
- 17:42:05velocity to reflect that eight story
- 17:42:07points was put into it even though you
- 17:42:09didn't get something that the product
- 17:42:11owner wanted. So I always close those
- 17:42:13stories and I write a new story for what
- 17:42:16the product owner really wants with new
- 17:42:18acceptance criteria for the next sprint.
- 17:42:21In this video, you learn that a sprint
- 17:42:24review is a demonstration of the
- 17:42:25features that have been implemented
- 17:42:26during the sprint. Everyone involved
- 17:42:29with the project is invited to
- 17:42:30participate and feedback from
- 17:42:32stakeholders is critical to help shape
- 17:42:34the future of the product. The backlog
- 17:42:37is updated based on the feedback.
- 17:42:40[Music]
- 17:42:51After watching this video, you'll be
- 17:42:53able to describe a sprint retrospective,
- 17:42:56explain who to invite to a sprint
- 17:42:57retrospective meeting, and describe how
- 17:43:00to conduct a sprint retrospective
- 17:43:01meeting. So, one of the last meetings is
- 17:43:04the sprint retrospective. This is a
- 17:43:06meeting to reflect on the sprint. very
- 17:43:09very critical for uh continuously
- 17:43:12improving is that we look back on what
- 17:43:14we did. Um so it measures the health of
- 17:43:17the process, measures the health of the
- 17:43:19team. Um and the development team must
- 17:43:21be able to speak freely, right? They
- 17:43:23have to be comfortable in this meeting
- 17:43:25that they could talk about anything that
- 17:43:26you know they want to talk about and
- 17:43:28discuss as they reflect on the sprint.
- 17:43:31And so who should attend this meeting?
- 17:43:34Well, the scrum master should be there
- 17:43:36and the development team. I do not
- 17:43:38invite the product owner to the sprint
- 17:43:40retrospective. And the reason I don't
- 17:43:42invite the product owner is because I
- 17:43:44want the development team to be able to
- 17:43:46speak freely. I want to be able to say,
- 17:43:48"Hey, that product owner is driving us
- 17:43:49too hard, right? I want them to be able
- 17:43:51to this them and the scrum master to
- 17:43:54have frank and honest conversations
- 17:43:56about how are things going." Now, you
- 17:43:59might have a product owner where you can
- 17:44:01tell them you're driving us too hard.
- 17:44:03Okay, then invite the product owner. But
- 17:44:05you don't want people to feel
- 17:44:06intimidated. Well, I was really going to
- 17:44:08tell you what went wrong, but I didn't
- 17:44:10want the product owner to think any less
- 17:44:11of me. You don't want that to happen.
- 17:44:13So, trust me on this one. Sprint
- 17:44:15retrospective, scrum master, the rest of
- 17:44:18the team without the product owner. And
- 17:44:21let's really dig into uh the health of
- 17:44:23the team. And so, there are three
- 17:44:26questions again uh that get asked in
- 17:44:29this team to reflect on the sprint. The
- 17:44:31first one is what did we do well, right?
- 17:44:33What should we keep doing? what went
- 17:44:34really good, you know, uh, and keep
- 17:44:36doing more of that. And then what did
- 17:44:38not go well, right? What should we stop
- 17:44:41doing? Uh, and have everybody speak
- 17:44:43freely about, you know, what did not go
- 17:44:45well and and what they'd like to not
- 17:44:46have to do next time. And then most
- 17:44:49importantly, what should we do to
- 17:44:51change, right? What do we want to change
- 17:44:52for the next time? Now, there might be a
- 17:44:54lot of changes. Uh, it's the scrum
- 17:44:56master's job to kind of document those
- 17:44:58changes and then make sure that
- 17:45:00something gets changed. You don't have
- 17:45:02to change all of them. It may be
- 17:45:03impossible to get them all done, but
- 17:45:05make sure something uh gets addressed uh
- 17:45:08for the next sprint so that the team
- 17:45:10knows that it's just not a gripe
- 17:45:11session, right? That things are actually
- 17:45:13happening. People are really listening.
- 17:45:15People really care about how they feel
- 17:45:16and they're trying to improve. So the
- 17:45:19goal here is improvement. It's critical
- 17:45:22to have a healthy team to be able to
- 17:45:24reflect and be able to talk about what
- 17:45:26went right, what went wrong, what should
- 17:45:28we do differently. And the scrum master
- 17:45:31must ensure right that changes are you
- 17:45:34know as a result of feedback changes are
- 17:45:36made right people want to feel that that
- 17:45:39things are getting better as a result of
- 17:45:41having these meetings otherwise there's
- 17:45:42no sense in having the meeting and the
- 17:45:45goal is just to improve for the next
- 17:45:47sprint. What could we do better for next
- 17:45:49time? There's always room for change.
- 17:45:51What could we do better the next time?
- 17:45:54In this video, you learned that a sprint
- 17:45:56retrospector is a time to reflect on how
- 17:45:58the sprint went. The development team
- 17:46:01must feel comfortable to speak freely
- 17:46:03and three questions are answered on what
- 17:46:06went right or wrong.
- 17:46:08The sprint retrospective must result in
- 17:46:10changes to improve the next sprint.
- 17:46:13[Music]
- 17:46:25After watching this video, you'll be
- 17:46:27able to describe the difference between
- 17:46:28vanity metrics and actionable metrics.
- 17:46:31Describe the top four actionable metrics
- 17:46:34and explain how metrics can be used to
- 17:46:36improve the team's performance.
- 17:46:39Having metrics is critically important
- 17:46:42because you can't improve what you can't
- 17:46:45measure. You have to be able to measure
- 17:46:47how you're doing. You can't just go by
- 17:46:48gut feel. The high-erforming teams are
- 17:46:52measuring how they're doing and they're
- 17:46:54reacting to those measurements and
- 17:46:55they're making sure that those are going
- 17:46:57in the right direction. Um, and so they
- 17:46:59take baselines, they set goals, and then
- 17:47:02they measure against those goals. This
- 17:47:04is critically critically important for
- 17:47:06the health of your team.
- 17:47:09So beware of vanity metrics. Oh, we got
- 17:47:1210,000 hits to our website. Let's have a
- 17:47:14pizza party.
- 17:47:15What does 10,000 hits mean? What does it
- 17:47:18really mean? Did somebody nervously
- 17:47:20click 10,000 times?
- 17:47:23Did 10,000 people click once and go
- 17:47:26away? You don't know. You have no idea.
- 17:47:29You don't know what people what drove
- 17:47:31them to the website. And you don't know
- 17:47:32what action to take next. How do I get
- 17:47:35more clicks? I don't know. Clicks or
- 17:47:38hits to a website is just a vanity
- 17:47:41metric. You want to be working on
- 17:47:43actionable metrics. So maybe you're
- 17:47:45doing some AB split testing, right?
- 17:47:47Where you've got two versions of
- 17:47:48something. You don't know how the
- 17:47:50customers are going to like it. And so
- 17:47:51you traffic shape 50% to one customer
- 17:47:54set, 50 to another, and then you
- 17:47:55measure, right? Did the customers who
- 17:47:57saw the new feature, did they react the
- 17:47:59way we wanted to? Did we get the
- 17:48:01behavior out of them? And if we did,
- 17:48:03then let's do more of that behavior. And
- 17:48:05if they didn't, then let's not do more
- 17:48:07of that behavior, right? Let's do less.
- 17:48:09So it's critical that you take a
- 17:48:10baseline, whatever that baseline is.
- 17:48:12Let's say it currently requires six
- 17:48:14teams uh you know 10 hours to make do a
- 17:48:16deployment and you want to decrease that
- 17:48:19or it costs so much uh you know money to
- 17:48:21go uh you know do a release whatever it
- 17:48:23is however you have the baseline you you
- 17:48:26pick something that you want to improve
- 17:48:27on and then you measure it the way it is
- 17:48:29today set that baseline and then you set
- 17:48:32yourself a goal maybe you want to reduce
- 17:48:34from 10 hours to two hours and you think
- 17:48:36about how can I do that right and then
- 17:48:38you measure it are we getting closer
- 17:48:39you're not going to you're not going to
- 17:48:40hit it the first time right this is
- 17:48:41going to be over a series of sprints,
- 17:48:43you know, are we getting faster? Are we
- 17:48:45getting better? Is it costing us less?
- 17:48:47Are we finding, you know, more bugs in
- 17:48:49production? I'm sorry, more bugs in
- 17:48:51testing, right? You don't want to find
- 17:48:52more bugs in production. Are we picking
- 17:48:54up more bugs in testing than we do in
- 17:48:56production, right? Which is going to
- 17:48:57cost us less money in doing uh break
- 17:48:59fix. So, whatever that is, you want to
- 17:49:02set a goal and measure against it. The
- 17:49:04top four actionable metrics that people
- 17:49:06use are mean lead time, right? How does
- 17:49:08it take? How long does it take to get
- 17:49:09from an idea to get something delivered
- 17:49:11to the customer? Uh release frequency.
- 17:49:13How often can you release? It doesn't
- 17:49:15have to be any faster than you need to
- 17:49:17release. If you only need to release
- 17:49:18once a week, that's fine. But can you
- 17:49:21release when you need to release
- 17:49:22something new to the customer? And then
- 17:49:24of course, what is your change uh
- 17:49:26failure rate, right? Are you releasing
- 17:49:27stuff that's breaking? All right, so
- 17:49:28that's critically important as well. And
- 17:49:30then meantime to recovery. It used to be
- 17:49:33meantime to failure, right? We would
- 17:49:35we'd make sure we never fail. make sure
- 17:49:37it never goes down. Well, it's going to
- 17:49:39go down. How fast can you recover from
- 17:49:41it going down is the question. And if
- 17:49:43it's quick enough and the customer
- 17:49:44doesn't even notice, that is the best of
- 17:49:46all. So meanantime to recovery is really
- 17:49:48what people are measuring as an
- 17:49:50actionable metric today. So let's look
- 17:49:52at some example metrics, right? Reduce
- 17:49:54time to market for new features, right?
- 17:49:56How fast does it take me to get a new
- 17:49:58feature out there? Does it take me days,
- 17:50:00weeks, months? Um increasing the overall
- 17:50:03availability of the product, right?
- 17:50:04Maybe you want to make something higher
- 17:50:06availability. Uh reducing the time it
- 17:50:08takes to deploy a release. That's that's
- 17:50:09a common one, right? We want to be able
- 17:50:10to get releases out quicker. Uh
- 17:50:12increasing the percentage of defects
- 17:50:14detected in testing before a production
- 17:50:16release because that is going to save
- 17:50:18you money in the long run. And then
- 17:50:20providing performance and user feedback
- 17:50:22uh to the team in a timely manner,
- 17:50:23right? Do I have fast feedback loops?
- 17:50:25Can I get feedback from the customer to
- 17:50:27my team? Maybe I want to get that
- 17:50:29quicker. I don't want it to take so
- 17:50:30long. Whatever those metrics are, um you
- 17:50:32want to pick one of them and then
- 17:50:34improve on it.
- 17:50:36In this video, you learn that high
- 17:50:38performing teams use metrics to
- 17:50:40continuously improve. It's important to
- 17:50:42be sure that the metrics you use are
- 17:50:44actionable. It's important to take a
- 17:50:47baseline before trying to measure
- 17:50:49change. And the top four actionable
- 17:50:51metrics can be used to improve your
- 17:50:53team's overall performance.
- 17:50:56[Music]
- 17:51:08After watching this video, you'll be
- 17:51:10able to close out the sprint on the
- 17:51:11conbon board, describe how to handle
- 17:51:13unfinished stories, and prepare for your
- 17:51:16next sprint.
- 17:51:18I want to talk about the end of sprint
- 17:51:20activities. What do you do at the end of
- 17:51:22a sprint after all the meetings are
- 17:51:24done? Well, you want to take anything
- 17:51:27that's in the done column and move it to
- 17:51:29closed. You might have done that during
- 17:51:31the sprint review, but if you didn't,
- 17:51:32now is a time to move all of the done
- 17:51:34items into the closed column. You also
- 17:51:37want to close out the current milestone.
- 17:51:39Um, if you're using sprints in the new
- 17:51:42ZenHub, they may close themselves out
- 17:51:44based on the uh the end date, but a
- 17:51:47regular milestone in GitHub will not
- 17:51:48close itself until you close it, just in
- 17:51:50case you run late. Uh, so you're in
- 17:51:52control of closing it and so you should
- 17:51:54close out that milestone so that you get
- 17:51:56credit for velocity on your velocity
- 17:51:57charts. You then want to create a new
- 17:52:00sprint milestone. Now, you might leave
- 17:52:02this until the next sprint planning
- 17:52:04meeting and that's okay. But just
- 17:52:06understand you close out one milestone,
- 17:52:08you're going to have to create a new
- 17:52:09milestone for the next sprint. And then
- 17:52:12you want to adjust any unfinished work.
- 17:52:16So what do I mean about unfinished work?
- 17:52:18Well, there's untouched stories. What
- 17:52:20about stories that haven't been worked
- 17:52:22on? They're in the sprint backlog and no
- 17:52:25one got to them, right? Um, so you can
- 17:52:28move those to the top of the product
- 17:52:30backlog. Some people move them to the
- 17:52:32next sprint. I like to resist the urge
- 17:52:34of just moving them into the next
- 17:52:36sprint. Um, because what if they're not
- 17:52:38the top priority anymore? What if we
- 17:52:41didn't get to those stories, but in the
- 17:52:42middle of the sprint, a new uh feature
- 17:52:44was requested that is our new top
- 17:52:46priority. So, I don't make any
- 17:52:48assumptions that just cuz we were
- 17:52:49working on it the last sprint, we ought
- 17:52:51to be working on it the next sprint if
- 17:52:53it wasn't finished. And so, I like to
- 17:52:55take them and move them to the top of
- 17:52:56the product backlog. If you do, remember
- 17:52:58to unassign them from the sprint
- 17:53:00milestone. Right? You don't want to have
- 17:53:02those dangling stories in the sprint
- 17:53:03milestone. Take them out of the
- 17:53:05milestone. Move them back to the top of
- 17:53:07the product backlog.
- 17:53:09How about unfinished stories? These are
- 17:53:11stories that people did get to, but they
- 17:53:14didn't finish. Very important for this
- 17:53:16is don't move the unfinished stories
- 17:53:18into the next sprint. Again, you're
- 17:53:20going to mess up your velocity. Somebody
- 17:53:22spent time working on half a story. And
- 17:53:25so what you should do is you could
- 17:53:27determine uh you know, was the was the
- 17:53:29sizing wrong? Uh if it was, you can
- 17:53:32adjust it. If it wasn't wrong, okay, it
- 17:53:33was an eight pointer. I only got to do
- 17:53:35four points of it. Then adjust the size
- 17:53:38down to four. And then write a new story
- 17:53:41because you want to keep your velocity
- 17:53:43accurate. Write a new story for the put
- 17:53:45it in the product backlog. That's the
- 17:53:47other four points. But give the
- 17:53:48developer credit and give the team
- 17:53:50credit for working on those four story
- 17:53:52points. So you never want to simply move
- 17:53:54them into the next sprint. You want to
- 17:53:56take them and close them in this sprint
- 17:53:58so you get credit for the velocity and
- 17:54:00then if you need to write a story for
- 17:54:02the next sprint with maybe more story
- 17:54:04points or half of the story points from
- 17:54:06the previous one.
- 17:54:08Uh the other thing you want to do is
- 17:54:10adjust the description. Right? You might
- 17:54:12want to say that this thing is
- 17:54:13unfinished. You might want to create an
- 17:54:15unfinished label. Um, you know, so that
- 17:54:17you can tell that it was closed, but it
- 17:54:19wasn't closed and completed. Maybe a not
- 17:54:21completed label. Uh, but the idea is
- 17:54:23that you you definitely want to uh
- 17:54:26identify in some way that this is a
- 17:54:28half-finish story, but you're closing it
- 17:54:30because you're closing out the sprint
- 17:54:31and the work was done in that sprint
- 17:54:34even though it was only half of the
- 17:54:35work. Uh, then you write a new story for
- 17:54:38the remaining work, right? So whatever
- 17:54:40work is left and maybe it's the
- 17:54:42remaining story points or maybe it's
- 17:54:43even more story points because it was
- 17:54:44bigger than we thought. Whatever it is,
- 17:54:46you write that story, put it in the
- 17:54:48product backlog, uh and then we could
- 17:54:49decide whether we're going to do it or
- 17:54:51not in the next sprint or maybe because
- 17:54:52it's half done, you're guaranteed, you
- 17:54:54know, you know that you want to do it in
- 17:54:56the next sprint, uh then you might want
- 17:54:57to move it to the next sprint, assuming
- 17:54:59you've already created that sprint
- 17:55:00milestone.
- 17:55:02Um and then you want to remain if you do
- 17:55:04write a new story, assign the remaining
- 17:55:06story points to that new story. Again,
- 17:55:09what we're trying to do is keep the
- 17:55:11velocity accurate. We want to get credit
- 17:55:13for the number of story points executed
- 17:55:15in a sprint, regardless of whether the
- 17:55:17story was finished or not, so that we
- 17:55:19know that our velocity is accurate. In
- 17:55:20the next sprint, we know how many story
- 17:55:22points we can take on to execute.
- 17:55:26So, getting ready for the next sprint,
- 17:55:29all the current stories should be
- 17:55:30assigned to uh the current sprint should
- 17:55:32be closed, right? Anything in the
- 17:55:34current sprint, you want to close that.
- 17:55:36uh all the unfinish finished stories
- 17:55:38they get reassigned. So you've handled
- 17:55:40all the stories are unfinished closed
- 17:55:42them maybe write new stories for the
- 17:55:43rest of finishing and then any of the
- 17:55:45the the sprint milestone is closed. Any
- 17:55:48stories that were in that sprint
- 17:55:49milestone get taken out of it put in the
- 17:55:51product backlog. Uh and then maybe a new
- 17:55:53sprint milestone is created either at
- 17:55:55the end of the sprint or at the
- 17:55:57beginning of the next sprint.
- 17:56:00In this video you learned that it is
- 17:56:02important to give developers credit for
- 17:56:04unfinished stories. Unfinished stories
- 17:56:06should be split into new stories to
- 17:56:08complete the work in the next sprint.
- 17:56:10Each sprint milestone should be closed
- 17:56:12when completed to reflect the velocity
- 17:56:14of the sprint. And you should create a
- 17:56:16new milestone for the next sprint.
- 17:56:19[Music]
- 17:56:31After watching this video, you'll be
- 17:56:32able to discuss some antiatterns to
- 17:56:34avoid them when practicing scrum and
- 17:56:37describe a checklist for measuring a
- 17:56:38healthy scrum team. So, let's discuss
- 17:56:42some antiatterns. The first one is no
- 17:56:45real product owner. Uh, and I've seen
- 17:56:47this happen on a number of teams where
- 17:56:49nobody's really sure who the product
- 17:56:51owner is. There are a couple of people
- 17:56:52who seem to be in charge, uh, but
- 17:56:54clearly one person with a vision, uh,
- 17:56:56you know, is not present. The other
- 17:56:59opposite I've seen is multiple product
- 17:57:01owners. I've been on scrum teams where
- 17:57:03there were two product owners and they
- 17:57:05didn't always agree on what to build.
- 17:57:07These are antiatterns. There should be a
- 17:57:09clear person who's playing the role of
- 17:57:11product owner who's the visionary for
- 17:57:13the team who's setting the vision uh and
- 17:57:15leading the team. Very very important.
- 17:57:18Then if the teams are too large, you
- 17:57:20don't want to have you know 20 30 people
- 17:57:22on a team. They should be less than 10.
- 17:57:24we say you know 5 plus or minus 2 or 7
- 17:57:27plus or minus two. You really don't want
- 17:57:28to have large teams because that uh is
- 17:57:31an antiattern uh because communications
- 17:57:33becomes too hard at that point and then
- 17:57:36the teams are not dedicated. I've seen
- 17:57:38this happen multiple times. People are
- 17:57:39on multiple projects. You're in the
- 17:57:41daily standup and you say what did you
- 17:57:43do yesterday and oh yesterday my manager
- 17:57:45pulled me off to work on another
- 17:57:46project. Clearly that is an antiattern.
- 17:57:49You know that is a recipe for disaster.
- 17:57:52So you want to make sure that if if
- 17:57:53that's happening on your teams, your
- 17:57:55teams are not going to be successful. Um
- 17:57:57if the teams are too geographically
- 17:57:58dispersed, I realize we work in
- 17:58:00international companies all around the
- 17:58:02world. You know, my recommendation is
- 17:58:03put at least two people in a geography
- 17:58:05in a time zone so they can collaborate
- 17:58:07together. Um but it really works best
- 17:58:09when all the teams are together in one
- 17:58:12time zone, one geography. And then if
- 17:58:14your teams are siloed, you know, the
- 17:58:16team should be working as one
- 17:58:17crossfunctional team. I shouldn't have
- 17:58:19to open tickets with other teams to get
- 17:58:21things done. Everything I need should be
- 17:58:23on that one team. So, that's very uh
- 17:58:25important. And then teams are not
- 17:58:27self-managing. The teams are not being
- 17:58:29told what to do, right? They're not
- 17:58:31being given stories to work on. The
- 17:58:33stories are in the backlog and they pick
- 17:58:35the next highest story off the backlog
- 17:58:37and they assign it to themselves, right?
- 17:58:39They're self-managing. It's critically
- 17:58:41important for the health of a scrum
- 17:58:43team. If you do these things, you will
- 17:58:45fail. You should not wonder why you
- 17:58:47failed. you know you were implementing
- 17:58:49all the anti patterns. So let's talk
- 17:58:51about some health check items that you
- 17:58:53can look at and make sure that your team
- 17:58:55is healthy. One of them is that
- 17:58:57everybody is accountable. Scrum master,
- 17:58:59product owner, team members, uh you know
- 17:59:01they all are accountable for what they
- 17:59:03do. They all feel ownership in what
- 17:59:05they're delivering. Uh and when
- 17:59:07something goes wrong, everybody chips in
- 17:59:09to make sure things happen right. So
- 17:59:10they should all understand what their
- 17:59:12role is and and act on that role. The
- 17:59:15second is that you're working in small
- 17:59:16sprints. Uh if you're working in sprints
- 17:59:19that are a month long, two months long,
- 17:59:21that's just too big. You need you need
- 17:59:22to be organized around one or one or two
- 17:59:24weeks, two or four week sprints. Um I
- 17:59:27don't like four weeks. I really like two
- 17:59:28week sprints. Some people do oneweek
- 17:59:30sprints. Um there's an ordered product
- 17:59:32backlog. This is key, right? If you you
- 17:59:35go in and look at the backlog and it's
- 17:59:37not ordered, you know, things are in
- 17:59:38disarray and the the stories don't have
- 17:59:41enough information for anybody to know
- 17:59:42what's going on, uh that's an indication
- 17:59:44that things aren't exactly healthy. Uh
- 17:59:47then is there a sprint backlog, right?
- 17:59:49That you could virtualize uh visualize
- 17:59:51the remaining work. And that's why we
- 17:59:53use a conbon board, right? So that we
- 17:59:54have these things in the backlog. We can
- 17:59:56look at them and very quickly and easily
- 17:59:57understand what is the work that's
- 17:59:59remaining in this sprint. What is the
- 18:00:01work that has has yet to be done? And
- 18:00:03then at sprint planning and forecast a
- 18:00:05sprint backlog and a sprint are created.
- 18:00:08Uh team should not be working without a
- 18:00:10backlog. Team should not be pulling off
- 18:00:11the product backlog. You really want to
- 18:00:13organize around a goal for the sprint
- 18:00:16and all the stories for that sprint are
- 18:00:17in that sprint backlog. Um the results
- 18:00:20of the daily scrum uh results in
- 18:00:22planning work or replanning work. So
- 18:00:24maybe you know something's not going as
- 18:00:26planned. You need to shuffle some
- 18:00:28stories. You need to add more people to
- 18:00:29a story. Need to get somebody help. uh
- 18:00:31and maybe you you know you replan as a
- 18:00:33result of that. Uh so that's very very
- 18:00:35important. Uh no later than the end of
- 18:00:38the sprint you've got a done increment,
- 18:00:39right? You don't want to have sprints
- 18:00:40where there's nothing to deliver. Uh in
- 18:00:42the beginning it's really hard to do
- 18:00:44this but once you get going uh there
- 18:00:46should be some new functionality that
- 18:00:47you're adding every two weeks that you
- 18:00:49can be uh you can demo and be
- 18:00:51accountable for. And then the
- 18:00:53stakeholders offering feedback. I I
- 18:00:55can't stress enough how critically
- 18:00:56important this is. The whole idea of
- 18:00:59delivering early and often is so that
- 18:01:01the stakeholders can look at it and they
- 18:01:03can offer you feedback and then you
- 18:01:04could decide whether you need to change
- 18:01:06the plan or change the product or change
- 18:01:08whatever direction you're going in. So
- 18:01:10that stakeholder feedback is very
- 18:01:11valuable. If you have sprint reviews and
- 18:01:13the stakeholders remain silent, not
- 18:01:16healthy, not healthy. They really need
- 18:01:17to be speaking up and saying whether
- 18:01:19they like it, don't like it. Uh the
- 18:01:21product backlog is updated as a result
- 18:01:24of a sprint review. So when you do the
- 18:01:25review, you may come up with new
- 18:01:27stories, you come up with new ideas. Uh
- 18:01:29you may decide that something should be
- 18:01:31implemented a little differently. And so
- 18:01:32at the end of that review, you go in and
- 18:01:34you add these new stories to the
- 18:01:35backlog, right? You you want to take
- 18:01:37that feedback that the stakeholders
- 18:01:39giving you and add that to the sprint
- 18:01:41backlog. So that becomes new stories
- 18:01:43that you can implement for your
- 18:01:44stakeholders.
- 18:01:46And then the product owner, the
- 18:01:47development team, the scrum master,
- 18:01:48they're all aligned on the work in
- 18:01:50process, right? So they know what's
- 18:01:52going to happen for their next sprint.
- 18:01:53Uh at the sprint retrospective, you want
- 18:01:56make sure everybody understands what
- 18:01:58went well, what didn't go well, what
- 18:01:59should we keep doing, what should we
- 18:02:00stop doing, and get alignment so that in
- 18:02:02the next sprint we do even better,
- 18:02:04right? We incrementally improve.
- 18:02:07In this video, you learn antiatterns to
- 18:02:10avoid when practicing scrum. No real
- 18:02:12product owner. Teams are too large.
- 18:02:14Teams are not dedicated. Teams are too
- 18:02:17great geographically dispersed. Teams
- 18:02:19are siloed. Teams are not self-managing.
- 18:02:22The Scrum Health Check provides
- 18:02:24guidelines for measuring a healthy scrum
- 18:02:26team.
- 18:02:27[Music]
- 18:02:37Welcome to the course capstone for
- 18:02:39project management. This course allows
- 18:02:42you to apply the project management
- 18:02:43knowledge and skills learned throughout
- 18:02:45all prior courses in the project
- 18:02:46management professional certificate PC
- 18:02:49program. Through this course, you will
- 18:02:52apply project management skills learned
- 18:02:54in the previous project management
- 18:02:56courses in the certificate program. We
- 18:02:58encourage you to complete all the
- 18:03:00courses in this professional certificate
- 18:03:02series before beginning this final
- 18:03:04course. You will have an opportunity to
- 18:03:06complete numerous hands-on activities
- 18:03:09based on a realworld scenario. We
- 18:03:12provide templates and instructional
- 18:03:13guidance to allow you to develop a
- 18:03:15portfolio of artifacts you can use to
- 18:03:17show your expertise and readiness for
- 18:03:19greater levels of project management
- 18:03:21responsibilities.
- 18:03:23Here is the breakdown of the activities
- 18:03:24you will complete in the six modules in
- 18:03:27this course. In module one, you will
- 18:03:29analyze a business case based on a
- 18:03:31project scenario and a Stacy diagram.
- 18:03:34From those assets, you will create a
- 18:03:36project charter and stakeholder
- 18:03:38register. In module two, you will
- 18:03:40develop project planning deliverables to
- 18:03:43support the project such as work
- 18:03:45breakdown structure WBS, a network
- 18:03:48diagram, and a highle budget. You will
- 18:03:51also create support planning documents,
- 18:03:53including a quality management plan, a
- 18:03:55communications management plan, and a
- 18:03:57risk register. In module three, we will
- 18:04:01transition from predictive planning to
- 18:04:03adaptive planning using scrum where you
- 18:04:05will develop user stories, a product
- 18:04:08backlog, and a sprint backlog. Using a
- 18:04:11conbon board, you will analyze a
- 18:04:13burndown chart to determine the project
- 18:04:15status and propose corrective actions.
- 18:04:18In module four, you will write a project
- 18:04:20status report and analyze proposed
- 18:04:22changes to the project by completing a
- 18:04:24change form. You will also write a
- 18:04:26closeout report for the project.
- 18:04:29In module 5, you will submit a PDF copy
- 18:04:32of selected activities for a peerreview
- 18:04:34evaluation and will also review another
- 18:04:36PI's project. Module six is a bonus
- 18:04:40module that contains information on
- 18:04:41building your portfolio and resume and
- 18:04:44job search tips. Each module includes a
- 18:04:47short quiz to test your knowledge, and
- 18:04:49you will be evaluated based on those
- 18:04:51module quizzes. To begin, you should
- 18:04:54explore the course site for a few
- 18:04:55minutes. If you have questions about
- 18:04:57course content, please post them in the
- 18:04:59forums to get help from others in the
- 18:05:01course community. For technical problems
- 18:05:03with the Corsera platform, visit the
- 18:05:05learner help center. We are excited to
- 18:05:08have you join us and hope you enjoy the
- 18:05:10course. Welcome to the capstone course.
- 18:05:13We are delighted you joined us.
- 18:05:20[Music]
- 18:05:25Welcome to project management capstone
- 18:05:28project scenario introduction. After
- 18:05:31watching this video, you will be able to
- 18:05:33summarize the case study project,
- 18:05:36describe the three scenario components.
- 18:05:39Projects are generally initiated by an
- 18:05:41approved business case, statement of
- 18:05:42work, or agreement. In addition, a
- 18:05:45methodology called Stacy diagramming is
- 18:05:48typically used to determine the
- 18:05:49appropriate life cycle for planning and
- 18:05:51executing a project. In this course, you
- 18:05:54will act as a project manager on behalf
- 18:05:56of Acme Health Innovations, AHI. AHI is
- 18:06:00a major provider of advanced skinare
- 18:06:02products. The leadership team at AHI
- 18:06:05corporate leadership team recently
- 18:06:07launched a strategic marketing
- 18:06:08initiative to improve real-time
- 18:06:10understanding and analysis of the target
- 18:06:12market. AHI had a robust marketing
- 18:06:15department. However, marketing analytics
- 18:06:18depends on numerous disconnected
- 18:06:20systems, all of which need to be
- 18:06:22connected to provide the data to adapt
- 18:06:24to a changing competitive and
- 18:06:26technological environment. The corporate
- 18:06:29team reviewed and approved a business
- 18:06:30case to develop an application app to
- 18:06:33serve internal and external customers
- 18:06:35and users. This app will solicit,
- 18:06:38collect, and evaluate information and
- 18:06:40data in key areas and provide real-time
- 18:06:43analytics andformational data. You will
- 18:06:46use three information sources to plan
- 18:06:48and manage this project. They include
- 18:06:50the project scenario, the business case,
- 18:06:52and the Stacy diagramming analysis. An
- 18:06:55overview of each of these will be
- 18:06:57explained in the following slides.
- 18:07:00The project scenario contains the key
- 18:07:02information you will need to plan this
- 18:07:03project such as an overview of the
- 18:07:06problem and the goals of the project.
- 18:07:09Key corporate contacts you will be
- 18:07:10working with. A list of the functions
- 18:07:12that the new marketing app must perform.
- 18:07:15A list of the benefits the new app
- 18:07:16should provide. The current marketing
- 18:07:18process of AHI and how the new app will
- 18:07:21improve efficiency. Stakeholder
- 18:07:23expectations for the app. Initial
- 18:07:26project cost estimates.
- 18:07:28This business case serves as the primary
- 18:07:30input for developing a project charter
- 18:07:32and subsequent project plan. This
- 18:07:34business case outlines the business
- 18:07:37needs, project justification, business
- 18:07:39strategy to implement the project. A
- 18:07:42Stacy diagramming analysis evaluates
- 18:07:45project goals against two key criteria.
- 18:07:47The first criteria is agreement. The
- 18:07:49second criteria is technological
- 18:07:51complexity.
- 18:07:53Agreement measures the degrees to which
- 18:07:55stakeholders agree on what the project
- 18:07:57should accomplish. Low agreement
- 18:07:59generally leads to many project changes.
- 18:08:01High agreement generally leads to fewer
- 18:08:03changes.
- 18:08:05Technical complexity measures the degree
- 18:08:07of uncertainty and innovation required
- 18:08:09to successfully implement the project.
- 18:08:12The Stacy diagram for this project
- 18:08:15identifies one five project objectives
- 18:08:18with a high level of agreement and a low
- 18:08:20level of technological complexity. These
- 18:08:23objectives are planned and executed
- 18:08:24using traditional predictive or
- 18:08:26waterfall methods. Two, two objectives
- 18:08:30with low levels of agreement and higher
- 18:08:32levels of technical complexity. These
- 18:08:34objectives are planned and executed
- 18:08:36using a scrum methodology.
- 18:08:39Before beginning the hands-on
- 18:08:40activities, please review the scenario,
- 18:08:43business case, and Stacy diagram.
- 18:08:50[Music]
- 18:08:56Welcome to project charter review. After
- 18:08:58watching this video, you will be able to
- 18:09:01describe the parts of a project charter.
- 18:09:04>> Hello everyone. and welcome to a brief
- 18:09:06demonstration on a project charter. The
- 18:09:09project charter is the first document
- 18:09:11created in the initiation phase. It
- 18:09:14answers what, why, and who questions
- 18:09:16about the project. The project charter
- 18:09:19must be approved by the project sponsor
- 18:09:21before formal planning can begin. The
- 18:09:24project charter is often developed using
- 18:09:26information provided in a business case,
- 18:09:28statement of work, or an agreement such
- 18:09:31as a contract memorandum of
- 18:09:33understanding or service level
- 18:09:35agreement. This brief demo shares the
- 18:09:38blank template you will use for the lab
- 18:09:40in the scenario provided. In addition,
- 18:09:43we share an example of a project
- 18:09:45charter. A project charter is often
- 18:09:48broken out into two parts. Part one is
- 18:09:51general information. Let's do a quick
- 18:09:53review. In the general information area,
- 18:09:57we want to identify the project name,
- 18:09:59the project goal, the value proposition
- 18:10:02and benefits that the project is
- 18:10:04providing. We want to provide a brief
- 18:10:06problem or opportunity statement, an
- 18:10:08overview of the project schedule, and
- 18:10:11very importantly, identify the project
- 18:10:13manager and the approval authority or
- 18:10:16the sponsor.
- 18:10:19Part two of the project charter provides
- 18:10:21additional project charter clarifying
- 18:10:23information that includes assumptions or
- 18:10:26constraints, a proposed high-level
- 18:10:29overview of the solution, project
- 18:10:32priorities, return on investment,
- 18:10:34potential risks, and any resources
- 18:10:37required.
- 18:10:39With that, let's review an example of a
- 18:10:42completed project charter. In this
- 18:10:44particular case, the project name is the
- 18:10:46ABC annual new investor dinner project.
- 18:10:50Notice how this is short and sweet and
- 18:10:52brief. The project goal, conduct a
- 18:10:55dinner for 40 potential investors. The
- 18:10:57goal is to win their business for the
- 18:11:00firm. In your project goal, outline what
- 18:11:03the goal is and provide what the overall
- 18:11:05measurable result of this project will
- 18:11:08be. In the value proposition, try to
- 18:11:11share what is the value of this
- 18:11:14particular project. You'll notice we
- 18:11:16have a note here. Finance, process,
- 18:11:18employee, customer. The Harvard School
- 18:11:21of Business developed a methodology
- 18:11:23called the balance scorecard. These are
- 18:11:26four areas that are critical to a
- 18:11:29business's success. Every project should
- 18:11:32go ahead and provide value in one or
- 18:11:34four of these areas. Very briefly,
- 18:11:38finance. Will our revenue improve? Will
- 18:11:41we save money? Will we avoid costs?
- 18:11:44Process. Are we able to improve our
- 18:11:47efficiency through this particular
- 18:11:48project? Employee. Are we able to
- 18:11:52increase employee motivation,
- 18:11:54confidence, passion, and skills? And
- 18:11:57customer. Are we able to delight our
- 18:12:00customers even more through
- 18:12:01implementation of this process?
- 18:12:05Always provide a brief problem or
- 18:12:06opportunity statement. In essence, this
- 18:12:09is a real quick overview of why this
- 18:12:11project should be done. Now,
- 18:12:15try to identify the project schedule.
- 18:12:17Keep this brief. It can be even as short
- 18:12:20as when you plan to start, when you plan
- 18:12:22to perform the project itself. Always
- 18:12:26include a project manager. This gives
- 18:12:29the project manager the authority to
- 18:12:31move into the planning process group.
- 18:12:33and also identify an individual sponsor
- 18:12:37who will provide authority and funding.
- 18:12:41In part two, define your assumptions and
- 18:12:44constraints. An assumption, something
- 18:12:46believed to be true but must be
- 18:12:47validated and a constraint limiting
- 18:12:50factors that must be considered in your
- 18:12:52proposed solution. Just simply provide a
- 18:12:55high-level overview of the steps
- 18:12:57required to manage and implement the
- 18:12:59project. In this particular case, we're
- 18:13:01using the plan, do, check, act
- 18:13:03methodology. And the proposed solution
- 18:13:06is as simple as plan the event, execute
- 18:13:08the event, and perform follow-up
- 18:13:10actions.
- 18:13:12In our project priorities, what we want
- 18:13:14to do is we want to prioritize time,
- 18:13:17cost, and scope. They are all important.
- 18:13:20However, in many cases, some are more
- 18:13:23important than others. In this
- 18:13:25particular example, schedule is the
- 18:13:28number one priority, budget the number
- 18:13:31two, and scope the number three. That
- 18:13:33doesn't mean that we do not have to
- 18:13:35complete the budget and the scope. What
- 18:13:37it means is that if something should
- 18:13:40occur, we will guard the schedule first,
- 18:13:42then we'll guard the budget, and
- 18:13:44finally, we'll guard the scope to the
- 18:13:46best of our ability.
- 18:13:49for return on investment. Try to always
- 18:13:52identify what your cost factors are and
- 18:13:55if there is a revenue uh stream that you
- 18:13:59can identify that is fine. If not,
- 18:14:02simply define the benefits. In this
- 18:14:04particular case, goodwill, word of
- 18:14:05mouth, advertising, grow the client
- 18:14:08base. Always identify your risks and
- 18:14:11identify them in terms of what the risk
- 18:14:13is and the potential impact to the
- 18:14:15project and end with an overview of
- 18:14:18resources required. These resources
- 18:14:21required will be expanded upon in the
- 18:14:23stakeholder register.
- 18:14:26Our next video will outline the
- 18:14:29stakeholder register which is the second
- 18:14:31part of this particular lab.
- 18:14:34>> In this video, you learn that the
- 18:14:36project charter consists of two parts.
- 18:14:38First is the general information about
- 18:14:40the project such as the project name,
- 18:14:43goal, value proposition, and benefits.
- 18:14:47The second part of the project charter
- 18:14:48clarifies information such as
- 18:14:50assumptions, constraints, solution
- 18:14:53overview, priorities, return on
- 18:14:55investment or ROI, risks, and required
- 18:14:59resources.
- 18:15:00[Music]
- 18:15:11Welcome to stakeholder register review.
- 18:15:14After watching this video, you will be
- 18:15:16able to explain the contents of a
- 18:15:18stakeholder register.
- 18:15:20>> Welcome to a brief demo on a stakeholder
- 18:15:22register. You will be asked to develop a
- 18:15:25stakeholder register as part of this
- 18:15:27module to support the project scenario
- 18:15:29information provided. A stakeholder
- 18:15:32register is a document that lists key
- 18:15:34stakeholders whose support is critical
- 18:15:36to successfully plan and implement a
- 18:15:39project. In this demo, we will quickly
- 18:15:42share a blank stakeholder register. This
- 18:15:45is the template you will use to support
- 18:15:47the handson lab assignment. This is
- 18:15:50located on tab one of the spreadsheet.
- 18:15:54We will then review an example of a
- 18:15:56completed stakeholder register. Always
- 18:15:59begin with the project name. This will
- 18:16:02distinguish this stakeholder register
- 18:16:04from those supporting other projects.
- 18:16:08Add the name of the individual
- 18:16:10stakeholder if known. If an individual
- 18:16:12has not been designated, simply add the
- 18:16:15position.
- 18:16:18List the stakeholders organization. This
- 18:16:20is important when stakeholders from
- 18:16:22multiple organizations are needed. For
- 18:16:25smaller projects, this column may not be
- 18:16:27applicable.
- 18:16:30Add the role of the stakeholder. If
- 18:16:32there is not a formal role designated,
- 18:16:35list the responsibilities of the
- 18:16:37stakeholder.
- 18:16:41Next, designate responsibilities using
- 18:16:43racy methodology. Racy terms or RACI are
- 18:16:48defined.
- 18:16:50An R is responsible for performing work
- 18:16:53or tasks. An A is accountable for
- 18:16:57outcomes. A C consult as a subject
- 18:17:01matter expert and I inform as the
- 18:17:04project progresses. In many cases, a
- 18:17:07single stakeholder may have multiple
- 18:17:10racy designators.
- 18:17:12The inform is normally used for non-team
- 18:17:15members. It is assumed that all project
- 18:17:18team members will be informed on a
- 18:17:20continual basis.
- 18:17:23Add any clarifying comments. Generally,
- 18:17:26comments provide more detail on the
- 18:17:28specific role assigned. And finally, add
- 18:17:31the version and date of the stakeholder
- 18:17:33register. This is a document that will
- 18:17:36change as the project progresses. Good
- 18:17:39luck on good luck on your lab and we
- 18:17:41look forward to sharing more future
- 18:17:44project management documentation and
- 18:17:46overviews. Have a great day.
- 18:17:48>> In this video, you learn that the
- 18:17:51stakeholder register is a document that
- 18:17:53lists key stakeholders, their roles,
- 18:17:55responsibilities, and designations
- 18:17:57according to the REI model.
- 18:18:03[Music]
- 18:18:09Welcome to the work breakdown structure
- 18:18:11review. After watching this video,
- 18:18:14you'll be able to explain the levels of
- 18:18:16a work breakdown structure.
- 18:18:18>> Hello everyone. I'd like to go ahead and
- 18:18:20take a moment and provide a brief
- 18:18:22demonstration of a tool and technique
- 18:18:25used in project management called a work
- 18:18:28breakdown structure. A work breakdown
- 18:18:30structure is a hierarchial breakout or
- 18:18:33decomposition of all project work. A
- 18:18:37work breakdown structure has three
- 18:18:39levels. Level one is the project level.
- 18:18:44Level two are the phase levels and level
- 18:18:47three is where the work is accomplished
- 18:18:50referred to as the work package level.
- 18:18:54The work breakdown structure is a
- 18:18:56critical tool that is used to define
- 18:18:58scope, schedule, and also perform budget
- 18:19:02planning. Each box within the work
- 18:19:06breakdown structure has a unique number.
- 18:19:09This is called a code of account
- 18:19:12identifier.
- 18:19:13Let's go ahead and take a look at an
- 18:19:15example of a work breakdown structure
- 18:19:18for an all hands project. Level one is
- 18:19:21the project level. We annotate it with
- 18:19:24the code of account identifier 1.0, the
- 18:19:28all hands project. Level two is the
- 18:19:31phase level. For this all hands project,
- 18:19:34we are breaking out the project into
- 18:19:36three phases. 1.1 is planning the
- 18:19:39project. 2.1 is executing the project.
- 18:19:423.1 is closing the project. Note how we
- 18:19:47are annotating each activity.
- 18:19:50with action and result. Plan the
- 18:19:53project, execute the project, close the
- 18:19:57project. Within level three, we break
- 18:20:00out each work package that needs to be
- 18:20:03accomplished to successfully achieve the
- 18:20:06phase. Within project planning, we need
- 18:20:10to manage the venue, develop a
- 18:20:12transportation plan, develop a catering
- 18:20:15plan, manage speakers, develop an
- 18:20:18audiovisisual plan, and develop and
- 18:20:20approve the agenda and the plan. Notice
- 18:20:23again we are using action and result.
- 18:20:27Try to go ahead and keep these work
- 18:20:30packages at a relatively high level. And
- 18:20:33in addition, try to go ahead and
- 18:20:35sequence them in the order in which
- 18:20:37they're going to occur. Once you are
- 18:20:40complete with the first phase, go to the
- 18:20:42second phase. Our second phase is to
- 18:20:45execute the project. We're going to
- 18:20:47prepare the venue, implement the first
- 18:20:50part of our transportation plan,
- 18:20:52implement the catering plan, welcome
- 18:20:54speakers, verify audiovisisual, and
- 18:20:57implement the event. Notice how within a
- 18:21:00work breakdown structure where we have a
- 18:21:03planning activity for example develop
- 18:21:05the audiovisisual plan we oftent times
- 18:21:08have an implementation activity as well
- 18:21:11verify the audio visual another example
- 18:21:15in planning we're going to develop the
- 18:21:18transportation plan in executing we're
- 18:21:21going to go ahead and implement the
- 18:21:22transportation plan
- 18:21:25the third phase is to close the project
- 18:21:28we're going to close the meeting, close
- 18:21:30out the venue, implement the
- 18:21:32transportation plan, part two, solicit
- 18:21:35feedback, and conduct lessons learned.
- 18:21:39You are going to have an opportunity to
- 18:21:41develop a work breakdown structure as
- 18:21:43part of your course lab. A blank
- 18:21:47template is provided for this lab. If
- 18:21:50you look at the first tab, we have a
- 18:21:52blank template that is ready for you to
- 18:21:54go ahead and complete.
- 18:21:57Do the best that you can on the lab. Try
- 18:22:00to complete a work breakdown structure
- 18:22:02and share it with your peers. And I look
- 18:22:05forward to seeing you in future
- 18:22:08demonstrations.
- 18:22:09>> In this video, you learn that the three
- 18:22:12levels of a work breakdown structure are
- 18:22:14the project level, the phase level, and
- 18:22:16the work package level.
- 18:22:22[Music]
- 18:22:28Welcome to network diagram review. After
- 18:22:31watching this video, you will be able to
- 18:22:33describe the steps involved in creating
- 18:22:35a network diagram.
- 18:22:37>> Hello everyone and welcome to a brief
- 18:22:39demo video on project network diagrams.
- 18:22:43You will have an opportunity to develop
- 18:22:45a network diagram in your final lab for
- 18:22:48this course.
- 18:22:49A network diagram is simply a graphical
- 18:22:52representation of a project's activities
- 18:22:55or work packages in the order in which
- 18:22:58they occur. Durations are then added to
- 18:23:02each activity to determine the critical
- 18:23:04path. So in other words, determine how
- 18:23:06long the project will take to complete.
- 18:23:10There are many tools you can use to
- 18:23:11build a network diagram. We will use a
- 18:23:14simple tool that you're looking at right
- 18:23:16now in Microsoft Excel.
- 18:23:19So let's begin. The most important step
- 18:23:21in creating a network diagram happens
- 18:23:24during scope planning. A network diagram
- 18:23:28uses activities identified in the work
- 18:23:30breakdown structure. Remember a work
- 18:23:33breakdown structure has three levels.
- 18:23:37There is the project at level one, the
- 18:23:40phases at level two and the activities
- 18:23:43at level three.
- 18:23:45for a project network diagram only map
- 18:23:48out the level three activities.
- 18:23:51So with that, let's review a simple
- 18:23:53meeting management network diagram and
- 18:23:56share the highlights.
- 18:23:58Step number one is to place all
- 18:24:00activities in the order in which they
- 18:24:03will occur. Always begin with a project
- 18:24:07start. This is usually shown by an oval
- 18:24:10mapping shape. Dependencies will play a
- 18:24:13factor in your execution order. In this
- 18:24:16example, we begin with activity number
- 18:24:19one, define outcomes. We then reviewed
- 18:24:23activities two and three. The team
- 18:24:26determined that these activities could
- 18:24:29occur simultaneously.
- 18:24:31Activity two and three are not dependent
- 18:24:34upon one another. Two and three can
- 18:24:38happen independently of one another.
- 18:24:40They also determined that activities two
- 18:24:43and three cannot occur until activity
- 18:24:46one is complete. Therefore, activities
- 18:24:50two and three are dependent upon
- 18:24:53activity number one.
- 18:24:56Continue mapping all activities all the
- 18:24:59way until the end. There may be times
- 18:25:02when you need to add a buffer. We have
- 18:25:05an example between activities four and
- 18:25:08activities five of a buffer. A buffer is
- 18:25:13nonworking waiting time. In this
- 18:25:17example, the agenda is forwarded in
- 18:25:19activity 4. It is sent out 2 days prior
- 18:25:23to the meeting in activity five. A
- 18:25:26buffer is depicted by a circle.
- 18:25:32In step two, we calculate the critical
- 18:25:36path. When activities are being
- 18:25:39accomplished concurrently, as in two and
- 18:25:42three and six and seven, we select the
- 18:25:46activity that has the longest duration.
- 18:25:49Let's take activities six and seven as
- 18:25:52our example. They can be accomplished
- 18:25:55concurrently.
- 18:25:56Activity six takes one day.
- 18:26:00Activity 7 takes 6 days. Activity 7 is
- 18:26:05the longest. It becomes part of the
- 18:26:08critical path. Activity 6 can be
- 18:26:11accomplished at sometime within the
- 18:26:136-day duration of activity 7. It is not
- 18:26:17on the critical path.
- 18:26:20A best practice in project management is
- 18:26:23to color code the critical path in red.
- 18:26:26As you can see on this example, we have
- 18:26:28those particular activities color-coded
- 18:26:31in red. Code activities not on the
- 18:26:35critical path in blue. You'll notice
- 18:26:37that we have two such activities. You
- 18:26:40are not mandated to use these color
- 18:26:43codes.
- 18:26:45We can now calculate the critical path.
- 18:26:48So let's take a look at the critical
- 18:26:50path. 1 + 2 + 1 + 2 + 1 + 6 equals a
- 18:26:59total of 13 days. This is the critical
- 18:27:03path. Or in other words, how long will
- 18:27:06this project take? This project will
- 18:27:08take 13 days.
- 18:27:11Step three recommends you use separate
- 18:27:13tabs for each phase or activity stream
- 18:27:16in your work breakdown structure. This
- 18:27:19will make your network diagram simpler,
- 18:27:22easier to analyze and update, and less
- 18:27:25complicated for those viewing the
- 18:27:26diagram.
- 18:27:28Step four is your validation. If there
- 18:27:31were 12 activities in your work
- 18:27:34breakdown structure, your network
- 18:27:36diagram should have 12 total activities.
- 18:27:40Now, this particular spreadsheet, as you
- 18:27:42can see, has two tabs. Tab two is the
- 18:27:46meeting example we have just shared. Tab
- 18:27:49one is a blank tab. Use the blank tab
- 18:27:54for your lab assignment. You will notice
- 18:27:56that there are ample activity buffer
- 18:27:59start and arrow symbols on the bottom of
- 18:28:03this particular blank template. And
- 18:28:07using these is simply as taking them and
- 18:28:10moving them up.
- 18:28:14Have fun with this.
- 18:28:16Now, I recommended that you do different
- 18:28:20phases on each particular tab. How would
- 18:28:24you go ahead and do this? To make a new
- 18:28:26tab, simply write click on the blank
- 18:28:30tab,
- 18:28:32select move or copy,
- 18:28:36move to the end, and create a copy.
- 18:28:43And there you see it. We now have a
- 18:28:46second tab for you to go ahead and
- 18:28:49continue your network diagram in phase
- 18:28:52number two. Continue this for sub
- 18:28:55subsequent phases of your work breakdown
- 18:28:58structure to complete your network
- 18:29:00diagram.
- 18:29:02So with that, enjoy the activity. Good
- 18:29:05luck on your lab assignment and we look
- 18:29:07forward to seeing you again in future
- 18:29:09demos. Have a great rest of your day.
- 18:29:12>> In this video, you learn that the steps
- 18:29:15involved in creating a network diagram
- 18:29:17include putting activities in order,
- 18:29:19calculating the critical path, and
- 18:29:20validating the activities.
- 18:29:27[Music]
- 18:29:33Welcome to budget planning review. After
- 18:29:35watching this video, you will be able to
- 18:29:38summarize the six steps to creating a
- 18:29:40highlevel budget.
- 18:29:42>> Welcome to a brief overview of how to
- 18:29:44develop a high-level budget using a tool
- 18:29:46called the resource breakdown structure
- 18:29:48or RBS.
- 18:29:51An RBS is defined as a hierarchial
- 18:29:54breakout of resources by category and
- 18:29:57type. You will have an opportunity to
- 18:29:59develop a highle budget as part of the
- 18:30:01hands-on lab requirements for this
- 18:30:04course. Before we begin, let's clarify
- 18:30:07types of project funding requirements.
- 18:30:10These are annotated in the notes at the
- 18:30:13bottom of this resource breakdown
- 18:30:15structure.
- 18:30:17Direct costs are funding requirements
- 18:30:19paid for by the project. The highle
- 18:30:22budget reflects only direct costs.
- 18:30:25Indirect costs are not annotated on the
- 18:30:28high-level budget. They are not paid for
- 18:30:31from the project budget. Finally,
- 18:30:34contingency reserves are funds set aside
- 18:30:36in the event of risk. You will normally
- 18:30:39not have access to these funds unless
- 18:30:42needed. So, let's take a stepby-step
- 18:30:45approach to completing the high-level
- 18:30:47budget using the RBS.
- 18:30:50Step one is to define the project.
- 18:30:53ensure stakeholders can identify the
- 18:30:55project the RBS supports.
- 18:30:59Step number two is to add the work
- 18:31:01breakdown structure or work breakdown
- 18:31:04structure identifier numbers and work
- 18:31:06package identifiers. This comes from
- 18:31:09your work breakdown structure.
- 18:31:12Step number three is to identify cost
- 18:31:14categories where project funding will be
- 18:31:16required. Refer to your project charter.
- 18:31:20Each project is different. In step four,
- 18:31:24list your funding requirements when they
- 18:31:26are required. As you can see in this
- 18:31:29example, a total of $6,630
- 18:31:33is required to support the total
- 18:31:35project. Match each individual funding
- 18:31:38requirement to the work breakdown
- 18:31:40structure work package where the funds
- 18:31:42are required and add clarification on
- 18:31:46precisely what the funds are for in the
- 18:31:49comments column. Sharing phased project
- 18:31:52funding requirements is critical. In all
- 18:31:55likelihood, you will not receive your
- 18:31:57entire project budget on day number one.
- 18:32:01In step number five, total up all
- 18:32:04individual funding requirements for each
- 18:32:06category.
- 18:32:09Once that is complete, calculate the
- 18:32:11total funding requirements for the
- 18:32:14project.
- 18:32:16Our final step six adds contingency
- 18:32:19reserves. These are funds set aside in
- 18:32:21the event of risk. A normal rule is 10%
- 18:32:25times total direct costs. You are not
- 18:32:28bound to this rule. This concludes our
- 18:32:31brief demo on how to use a resource
- 18:32:33breakdown structure to develop a
- 18:32:35high-level budget. Best of luck in your
- 18:32:38lab. In this video, you'll learn that
- 18:32:41the steps to creating a highle budget
- 18:32:43include defining the project, adding the
- 18:32:46WBS, identifying cost categories,
- 18:32:49listing and summing requirements, and
- 18:32:51adding contingency reserves.
- 18:32:58[Music]
- 18:33:04Welcome to communications management
- 18:33:06review. After watching this video, you
- 18:33:09will be able to describe the parts of a
- 18:33:11communications management plan.
- 18:33:13>> Welcome to a short demo of a
- 18:33:15communications management plan. The
- 18:33:18purpose of a communications management
- 18:33:20plan is to describe how, when, and by
- 18:33:23whom information about the project will
- 18:33:25be administered and disseminated.
- 18:33:28Let's walk through an example of a
- 18:33:30communications management plan and share
- 18:33:33the format of this document.
- 18:33:37Step one is project identification.
- 18:33:40Identify the project that the
- 18:33:42communications management plan supports
- 18:33:44and apply version control. For example,
- 18:33:47as you can see on the bottom of this
- 18:33:49form, this is version one dated 29
- 18:33:52February. We use version control because
- 18:33:55this plan will likely change.
- 18:33:59Step two is to identify the
- 18:34:01communication item. What is required to
- 18:34:04be communicated
- 18:34:07in step three? Assign an owner to manage
- 18:34:09the communications item. Ensure this
- 18:34:12owner is able to satisfy this role and
- 18:34:15committed to do so.
- 18:34:18In step four, identify the target
- 18:34:20audience for the communications. Try to
- 18:34:23target stakeholders who have a need for
- 18:34:25the information item. Avoid sending
- 18:34:27everything to everybody.
- 18:34:31Step five documents the when factor. Try
- 18:34:34to establish a logical schedule that the
- 18:34:37target audience can commit to and
- 18:34:39follow.
- 18:34:42In step six, identify the medium you
- 18:34:44will use to communicate. Ensure all
- 18:34:47target audience members have access and
- 18:34:50availability.
- 18:34:52Finally, in step seven, define the
- 18:34:54purpose of the communications. Ensure
- 18:34:57every stakeholder understands why the
- 18:34:59communication is pertinent to the
- 18:35:02project.
- 18:35:05Develop the communications management
- 18:35:07plan as follows. Number one, determine
- 18:35:10key communications items required to
- 18:35:12successfully plan and implement the
- 18:35:14project. This particular example lists
- 18:35:18some common communications item entries.
- 18:35:21Secondly, verify that all owners have
- 18:35:24the capacity and the ability to manage
- 18:35:28the communications item assigned.
- 18:35:31Third, let the target audience
- 18:35:33understand what the communication item
- 18:35:36they are tasked to participate in is and
- 18:35:39ensure they understand the purpose for
- 18:35:42their involvement. Finally, update the
- 18:35:45plan on a periodic basis and keep it
- 18:35:47current. You will have an opportunity to
- 18:35:50review the project scenario and
- 18:35:52determine applicable communication
- 18:35:53planning needs for our project scenario.
- 18:35:57>> In this video, you learn that a
- 18:35:59communications management plan includes
- 18:36:01project identification, defining the
- 18:36:04communication team, naming the target
- 18:36:06audience, establishing a schedule,
- 18:36:09describing the medium of communication,
- 18:36:11and defining the purpose of
- 18:36:13communications.
- 18:36:15[Music]
- 18:36:25Welcome to quality management review.
- 18:36:28After watching this video, you'll be
- 18:36:30able to explain the steps involved in
- 18:36:33the creation of a quality management
- 18:36:34plan.
- 18:36:36>> Welcome to a short demo of a quality
- 18:36:38management plan. The purpose of a
- 18:36:40quality management plan is to describe
- 18:36:43how policies, procedures, standards, and
- 18:36:46guidelines will be implemented to
- 18:36:48achieve quality objectives.
- 18:36:51Policies and procedures are achieved by
- 18:36:53conducting periodic quality assurance
- 18:36:56audits. Quality assurance is
- 18:36:58preventative and accomplished during
- 18:37:00project executing process group
- 18:37:03processes.
- 18:37:05Guidelines as documented in the project
- 18:37:07management plan are accomplished by
- 18:37:10conducting periodic quality control
- 18:37:12inspections. Quality control is
- 18:37:15corrective and accomplished during
- 18:37:17project monitoring and controlling
- 18:37:19process group processes.
- 18:37:22A quality management plan is
- 18:37:25accomplished in five steps. Step one is
- 18:37:29project identification. Identify the
- 18:37:32project that the quality management plan
- 18:37:34supports and apply version control. This
- 18:37:37plan will likely change.
- 18:37:40Step two is to identify project
- 18:37:42objectives. These objectives are
- 18:37:45normally listed in the project charter.
- 18:37:48The overall goals of project quality are
- 18:37:51to conform to requirements and provide a
- 18:37:54product or service that is fit for use.
- 18:37:57The project objectives provide the basis
- 18:37:59to achieve project quality goals.
- 18:38:03In step three, define the project
- 18:38:06quality management team. The team will
- 18:38:09normally consist of the project manager,
- 18:38:12quality assurance and quality control
- 18:38:14leads, subject matter experts, and any
- 18:38:17other stakeholder involved in ensuring
- 18:38:19quality. REI is a common way to define
- 18:38:23quality team roles. As a review, REI
- 18:38:27stands for R responsible, A accountable,
- 18:38:31C consult, and I inform.
- 18:38:37In step four,
- 18:38:40determine quality assurance activities
- 18:38:43will be that will be critical to ensure
- 18:38:45policy, procedure, and defined standards
- 18:38:48are being followed. Be proactive. look
- 18:38:51for potential problems and prevent them
- 18:38:54before they become major issues. Quality
- 18:38:57assurance activities are accomplished
- 18:38:59using quality audits.
- 18:39:02Finally, in step five, identify quality
- 18:39:06control activities. Quality control uses
- 18:39:09inspections to verify deliverables and
- 18:39:12correct defects before the product or
- 18:39:14service is transitioned to the customer.
- 18:39:18Use the quality management plan to plan
- 18:39:20and execute your project quality
- 18:39:23requirements. In this video, you learn
- 18:39:26that the steps involved in creating a
- 18:39:29quality management plan include project
- 18:39:31identification, defining objectives,
- 18:39:34defining the project quality management
- 18:39:36team, determining quality assurance and
- 18:39:38quality control activities.
- 18:39:45[Music]
- 18:39:51Welcome to risk register review. After
- 18:39:54watching this video, you will be able to
- 18:39:56name the key entries of a risk register.
- 18:39:58>> Welcome to a short demo to explain the
- 18:40:01content of a risk register. A risk
- 18:40:04register is a tool that lists all risks
- 18:40:07identified with the potential to impact
- 18:40:09a project both positively or negatively.
- 18:40:13Risks are classified as either
- 18:40:15opportunities or threats. Let's walk
- 18:40:18through an example of a risk register
- 18:40:21and share the format of this document.
- 18:40:23There are a number of key entries
- 18:40:25required to complete a risk register.
- 18:40:28Let's examine a risk register example
- 18:40:31and explain each column moving from top
- 18:40:34to bottom and left to right.
- 18:40:38Begin by identifying the project the
- 18:40:40risk register supports. Date the risk
- 18:40:43register as well. A risk register is a
- 18:40:46dynamic document that is updated often.
- 18:40:51Use risk metal language to document
- 18:40:54risks. Risk metal language identifies a
- 18:40:57risk by describing the cause or risk
- 18:41:01condition, the event that may result
- 18:41:04from the cause, and the potential impact
- 18:41:07of the event to the project.
- 18:41:11Each risk should be assigned to a risk
- 18:41:13owner. This role is responsible for
- 18:41:16analyzing the risk, periodically
- 18:41:19reassessing the risk, and developing and
- 18:41:21implementing responses if the risk
- 18:41:24becomes an issue.
- 18:41:27There are many ways to categorize risks.
- 18:41:30You may choose to categorize by
- 18:41:31functions such as finance or information
- 18:41:34technology, or you may choose to
- 18:41:36categorize, as shown on this example, by
- 18:41:39opportunity or threat.
- 18:41:44All risk registers should share a scale
- 18:41:47to determine the probability and impact
- 18:41:50rating for the risk. Probability is the
- 18:41:53chance that the risk will occur. Impact
- 18:41:56is a measure of the consequences of the
- 18:41:59risk to the project if it does occur.
- 18:42:04A risk score is the product of
- 18:42:06probability times impact. The higher the
- 18:42:10score, the more attention you want to
- 18:42:12give the risk. Note that threats are
- 18:42:14given a positive number. Opportunities
- 18:42:17are given a negative number. More on
- 18:42:20this in a moment.
- 18:42:23Some risks may have a trigger. This is
- 18:42:26an early warning that a risk is about to
- 18:42:28occur. Triggers lead to the need to
- 18:42:31implement a risk response.
- 18:42:34Finally, each risk should have a
- 18:42:36potential response. For threats, the
- 18:42:39goal is to avoid the risk cause or
- 18:42:41mitigate the probability and or impact.
- 18:42:44For opportunities, the goal is to
- 18:42:47exploit the opportunity or enhance the
- 18:42:49probability and or impact of the
- 18:42:52opportunity occurring.
- 18:42:57Always total up the project risk score.
- 18:43:01The higher the score, the more risk a
- 18:43:03project potentially faces. Threats add
- 18:43:07to the overall risk score.
- 18:43:10Opportunities, on the other hand, reduce
- 18:43:13overall risk score.
- 18:43:17Many project managers track the overall
- 18:43:19project risk score. They trend these
- 18:43:22scores as a measure of overall project
- 18:43:25risk exposure. When the score increases,
- 18:43:29exposure increases. When the score
- 18:43:31decreases, overall exposure decreases.
- 18:43:36Use a risk register to your advantage.
- 18:43:38It is said that if you fail to manage
- 18:43:41risk, risk will manage you. In this
- 18:43:44video, you learn that the key entries of
- 18:43:47a risk register are project
- 18:43:48identification, describing the risk
- 18:43:50condition, assigning a risk owner,
- 18:43:53categorizing the risk, defining a
- 18:43:55rating, determining the score, and
- 18:43:58identifying risk triggers.
- 18:44:04[Music]
- 18:44:10Welcome to user story review. After
- 18:44:12watching this video, you will be able to
- 18:44:15describe the parts of a user story.
- 18:44:17>> Welcome to a brief demo on user stories.
- 18:44:21User stories are developed by the
- 18:44:22product owner and placed in a
- 18:44:24prioritized product backlog. User
- 18:44:27stories scheduled for completion in the
- 18:44:29next sprint are selected during sprint
- 18:44:32planning by the team. The team bases its
- 18:44:35selection on velocity considerations.
- 18:44:38Velocity is a measure of how many
- 18:44:41stories can be completed to done in a
- 18:44:44given sprint. Velocity is generally
- 18:44:46based on story points. A user story has
- 18:44:50two parts. Part one is general
- 18:44:52information formatted by role, need, and
- 18:44:56value statements. As you can see in this
- 18:44:58example, each user story is given a
- 18:45:02title.
- 18:45:04In this example, the title is simply the
- 18:45:07first user story supporting the customer
- 18:45:09role. In part one, the user story should
- 18:45:14tell a story. For example, as a role, I
- 18:45:18need a capability to provide desired
- 18:45:22value.
- 18:45:23Part two of the user story lists
- 18:45:26acceptance criteria. This is an overview
- 18:45:29of measurable objectives the development
- 18:45:31team will build to support the user
- 18:45:34story. The goal of the team during the
- 18:45:36sprint is to build 100% of the
- 18:45:39acceptance criteria. 100% completion of
- 18:45:43a user story is referred to as done.
- 18:45:46>> In this video, you learned that a user
- 18:45:49story should include a role, a
- 18:45:51capability, and the desired value.
- 18:45:53[Music]
- 18:46:04Welcome to product backlog. After
- 18:46:06watching this video, you will be able to
- 18:46:09explain the components of a product
- 18:46:10backlog.
- 18:46:11>> Welcome to a brief demo on a product
- 18:46:14backlog. The product backlog serves as a
- 18:46:17repository for all confirmed user
- 18:46:19stories. User stories are placed into
- 18:46:22the product backlog by the product owner
- 18:46:25once the story is confirmed by both the
- 18:46:28customer and the team.
- 18:46:30User stories are prioritized based on
- 18:46:33value to the customer. User stories
- 18:46:36scheduled for development in the near
- 18:46:37term must be detailed appropriately and
- 18:46:40able to be broken out into tasks that
- 18:46:43can be assigned and estimated.
- 18:46:46A product backlog contains the
- 18:46:48following. As you can see in this
- 18:46:50example, each user story has a distinct
- 18:46:54identifier number. Each user story is
- 18:46:58prioritized.
- 18:47:01Each user story is categorized. A common
- 18:47:04categorization method is simply sharing
- 18:47:06the role the user story supports.
- 18:47:10In some cases, a firm may employ
- 18:47:12multiple scrum teams. If this is the
- 18:47:15case, list the team name responsible for
- 18:47:17the user story.
- 18:47:20Identify the role, need, and value,
- 18:47:25and acceptance criteria as listed on the
- 18:47:28user story.
- 18:47:34Assign story points to each user story.
- 18:47:37More on this in a moment. And finally,
- 18:47:41provide any clarifying comments. In this
- 18:47:44example, we list the sprint when the
- 18:47:46user story will be implemented.
- 18:47:50Now, let's discuss story points. Story
- 18:47:54points are a measure of the overall
- 18:47:56complexity of a user story. Complexity
- 18:47:59is determined through a process called
- 18:48:02relative estimation. In this example,
- 18:48:07we show five user stories. To perform
- 18:48:10relative estimation, we review user
- 18:48:14story number one. The team discusses
- 18:48:17complexity factors. Place user story
- 18:48:19number one in the middle of the grid.
- 18:48:24Next, review user story number two. The
- 18:48:28team discusses complexity factors. In
- 18:48:31this case, the team determines user
- 18:48:33story is less complex than user story 1.
- 18:48:37Place user story 2 to the left of user
- 18:48:40story number one.
- 18:48:48Next, review user story number three.
- 18:48:51The team determined user story 3 is
- 18:48:54equally complex as user story 1. Place
- 18:48:57user story 3 under user story 1.
- 18:49:04Next, review user story 4. The team
- 18:49:07determined user story 4 is more complex
- 18:49:10than user stories 1 and three. Place
- 18:49:14user story 4 to the right of user
- 18:49:16stories one and three.
- 18:49:22Finally, review user story 5. The team
- 18:49:25determined this user story is less
- 18:49:28complex than user story 2. Place story 5
- 18:49:32to the left of user story 2.
- 18:49:39We are now ready to place the user
- 18:49:41stories into the appropriate story point
- 18:49:44columns. These columns follow a
- 18:49:47numbering system developed by Mike Con
- 18:49:50based on Fibonacci numbering system.
- 18:49:53Story points of 1 2 3 5 and 8 are used
- 18:49:57to show that complexity does not
- 18:50:00increase in a mathematically linear way.
- 18:50:03Finally, we can now total up our story
- 18:50:06points. Let's see how this looks in the
- 18:50:09relative estimation solution. As you can
- 18:50:12see, we have a total of 14 story points.
- 18:50:16In this video, you learn that the main
- 18:50:19components of a product backlog include
- 18:50:21priorities, categories, user stories,
- 18:50:25story points, and clarifying comments.
- 18:50:32[Music]
- 18:50:39Welcome to Sprint backlog review. After
- 18:50:42watching this video, you will be able to
- 18:50:44summarize the features of a sprint
- 18:50:46backlog.
- 18:50:47>> Welcome to our final demo on a sprint
- 18:50:49backlog. A sprint backlog is created by
- 18:50:52the development team. A sprint backlog
- 18:50:55is much like a traditional work
- 18:50:57breakdown structure. The sprint backlog
- 18:51:00breaks out each user story into
- 18:51:02assignable tasks that can be measured to
- 18:51:05ensure completion and determine time
- 18:51:08required.
- 18:51:09Let's review an example and highlight
- 18:51:11some sprint backlog features.
- 18:51:15First of all, always list the project
- 18:51:17that the sprint backlog supports.
- 18:51:21Next, list the personnel resources
- 18:51:24required to complete the user story by
- 18:51:27task.
- 18:51:29Normally a team member is assigned as
- 18:51:32the lead to manage development efforts
- 18:51:34of the user story and facilitate
- 18:51:37discussions to determine the tasks.
- 18:51:40Tasks normally conform to the acceptance
- 18:51:42criteria documented in the user story.
- 18:51:46As a note, the se the team
- 18:51:49self-organizes.
- 18:51:50They determine internally who will lead
- 18:51:53the user story efforts and who will work
- 18:51:55on each task.
- 18:51:58Ask each task lead to determine how much
- 18:52:02time their task will require to
- 18:52:05complete. This is normally accomplished
- 18:52:07in hours. Total up the hours to complete
- 18:52:11the user story. In this example, user
- 18:52:14story 1 requires 77 hours. User story 2
- 18:52:19requires 30 hours. And the total hour
- 18:52:23requirement for the entire sprint is and
- 18:52:27seven hours.
- 18:52:30At the beginning of each day, each team
- 18:52:33member will share what they
- 18:52:34accomplished, what they are working on,
- 18:52:37and share any blockers at the daily
- 18:52:39scrum meeting. They will also provide an
- 18:52:42update of the hours remaining. The scrum
- 18:52:46master will often use the time required
- 18:52:48and time remaining to develop burndown
- 18:52:51or burn up charts. A burndown chart is
- 18:52:55most common. It shows the total time
- 18:52:58required to accomplish the sprint and
- 18:53:00compares it to the work remaining. The
- 18:53:03goal is to complete all user stories and
- 18:53:06tasks by the end of the sprint.
- 18:53:08>> In this video, you learn that the sprint
- 18:53:11backlog should incorporate required
- 18:53:13personnel resources and time estimations
- 18:53:15for task completion.
- 18:53:21[Music]
- 18:53:27Welcome to status reporting review.
- 18:53:30After watching this video, you will be
- 18:53:32able to create a project status report.
- 18:53:35>> Hello everyone and welcome to a quick
- 18:53:37demonstration on a project status
- 18:53:40report. Before we begin, let's go ahead
- 18:53:43and define the purpose of project status
- 18:53:45reports. First and foremost is to ensure
- 18:53:48current status is understood by all key
- 18:53:51stakeholders. Secondly, a good status
- 18:53:54report can help maintain interest and
- 18:53:56commitment levels. And third, a status
- 18:53:59report should be a tool to address
- 18:54:01issues and help needed. We have an
- 18:54:04example of a one-page status report. And
- 18:54:07let me repeat that last phrase, one
- 18:54:10page. The best status reports are short.
- 18:54:14What goes into a status report? To begin
- 18:54:17with, we should always have the project
- 18:54:20identifier or name. In this particular
- 18:54:23case, we have the ABC company all hands
- 18:54:26meeting. The status report should also
- 18:54:29be dated. Status reports are not a
- 18:54:32oneandone. You're going to go ahead and
- 18:54:34submit periodic status reports and they
- 18:54:36will build upon one another. Always
- 18:54:40define your name and your organization.
- 18:54:43In most cases, the project manager is
- 18:54:45the individual who submits the status
- 18:54:47report. In this partic in this
- 18:54:50particular case, we have Sarah Wilson
- 18:54:52who is in operations.
- 18:54:54The next area is very very important,
- 18:54:57deliverable status. And the best method
- 18:55:00to report deliverable status is using
- 18:55:03what we call traffic light reporting,
- 18:55:05which is red, yellow, and green. You'll
- 18:55:08notice that we have a overview of what
- 18:55:11red, yellow, and green mean. Provide a
- 18:55:15definition that is suitable to your
- 18:55:18particular project. The definitions that
- 18:55:21you see here may work for you or you may
- 18:55:24want to go ahead and update them and
- 18:55:26make them more specific for the project
- 18:55:28that you are managing. But the bottom
- 18:55:30line is this. Ensure that when people
- 18:55:33are reporting green, red and yellow that
- 18:55:37everyone is using the same definition.
- 18:55:41Color codes are very very effective. The
- 18:55:44three key deliverable status indicators
- 18:55:47that most stakeholders are going to be
- 18:55:49interested in is scope, schedule, and
- 18:55:53budget. That's our triangle in a
- 18:55:56project.
- 18:55:57What we want to do is to define the
- 18:56:00current health of the project in terms
- 18:56:02of scope, schedule and budget. And we
- 18:56:05also want to show how this particular
- 18:56:08status is trending. You'll notice in
- 18:56:11this example we have scope is currently
- 18:56:13yellow and trending yellow. Schedule is
- 18:56:16fine, green and green. Budget is
- 18:56:18currently green. However, it's trending
- 18:56:21toward red. What follows after your
- 18:56:25status is help needed. One of the things
- 18:56:29that we want to do is to describe the
- 18:56:31help needed. And help needed is any help
- 18:56:34that will allow us to stay green or
- 18:56:38return to green. Normally a best
- 18:56:41practice is to describe the help needed
- 18:56:43in terms of a must-have, a should have
- 18:56:46or a like to have. Everything should not
- 18:56:49be a must-have. So in this particular
- 18:56:52case we have a must-have. We need to
- 18:56:54finalize the speaker agenda and who is
- 18:56:57the source for this help the CEO and
- 18:57:00operations manager. You'll notice above
- 18:57:03we had scope yellow and yellow. One of
- 18:57:06the reasons for that is because the
- 18:57:08speaker agenda has not yet been
- 18:57:10finalized. A should have we need to
- 18:57:13identify alternative caterer to meet
- 18:57:15some dietary needs and this is again the
- 18:57:18operations manager. And then we have
- 18:57:20another must-have. We may need an
- 18:57:22additional $2,000. The initial
- 18:57:24refreshment estimate was too low, and
- 18:57:27that is assigned to the finance lead.
- 18:57:29You'll notice our budget is currently
- 18:57:31green, but it is trending toward red
- 18:57:33because we realize that we are going to
- 18:57:35have a funding shortfall. The next area
- 18:57:39is for risk. What are some new risks and
- 18:57:42changes since the last report? So, we
- 18:57:44have two risks that we can add. Key
- 18:57:47personnel absences may impact the
- 18:57:50overall quality of the project and
- 18:57:53limited gluten-free food choices is
- 18:57:56driving some of the catering cost
- 18:57:58overruns. However, we had a risk that we
- 18:58:01had reported in our last status report.
- 18:58:04AV configuration issues have now been
- 18:58:08overcome. What are some issues? What is
- 18:58:11an issue? That is a risk that occurred
- 18:58:13or questions you need to have responses
- 18:58:16for. The food cost estimates were higher
- 18:58:18than planned. That's no longer a risk.
- 18:58:21That is an issue. We need to know where
- 18:58:24to fit the motivational speaker in the
- 18:58:26agenda as well. Are there any recent or
- 18:58:29pending decisions impacting the project?
- 18:58:32Yes, finalization of required speakers
- 18:58:35is needed to plan the agenda. And
- 18:58:37finally, any kind of comments. And this
- 18:58:39may seem redundant, but it's not a bad
- 18:58:41thing to repeat good news or to
- 18:58:44reiterate perhaps bad news or help
- 18:58:47needed. The AV issues previously
- 18:58:49reported were resolved and the
- 18:58:51motivational speaker was identified.
- 18:58:54Before we close this demo, just five key
- 18:58:57notes. Number one, keep the report
- 18:58:59brief. Shorter reports are much easier
- 18:59:02to understand. Number two, traffic light
- 18:59:05reporting green, yellow, and red is a
- 18:59:08best practice. It is great to use the
- 18:59:10colors as you saw in the demo status
- 18:59:13report that we just shared. However,
- 18:59:15remember that some people cannot see
- 18:59:17colors well, so add the verbiage. Third,
- 18:59:20share the most important information
- 18:59:23first. People normally read from top to
- 18:59:26bottom. Next, determine the optimal
- 18:59:29reporting frequency based on the needs
- 18:59:31of the project. If status is slowly
- 18:59:34changing, perhaps an every other week
- 18:59:36status reporting schedule will suffice.
- 18:59:39And finally, ensure the status report is
- 18:59:41targeted at the stakeholders who need
- 18:59:43the information. Ensure these
- 18:59:45stakeholders have access to the report.
- 18:59:49This concludes our demo on status
- 18:59:52reporting. You will have the opportunity
- 18:59:54to read a scenario, analyze this
- 18:59:57scenario, and prepare a status report as
- 19:00:00part of your course lab requirements.
- 19:00:04Thank you for your attention. Have a
- 19:00:06great rest of your day, and we look
- 19:00:07forward to seeing you again for future
- 19:00:09demonstrations. In this video, you learn
- 19:00:12that when writing a status report, you
- 19:00:15should provide an overview of the
- 19:00:17status, scope, and budget, review risks,
- 19:00:20and provide updates on current issues,
- 19:00:23and share current health and forecast.
- 19:00:30[Music]
- 19:00:36Welcome to change request review. After
- 19:00:39watching this video, you will be able to
- 19:00:41write a standard change request.
- 19:00:43>> Welcome to a short demo. For the next
- 19:00:46few minutes, we will highlight a
- 19:00:47standard change request form whose
- 19:00:49design conforms to a step-by-step
- 19:00:52integrated change control process
- 19:00:54championed by the Project Management
- 19:00:56Institute or PMI.
- 19:00:59PMI states that all changes should be
- 19:01:01processed using the following stepbystep
- 19:01:05process. Step number one, log the
- 19:01:08change. Every change request submitted
- 19:01:11should be assigned a unique tracking
- 19:01:13number. Step number two, ensure the
- 19:01:16purpose of the change is clearly
- 19:01:17documented. Ensure the reason for the
- 19:01:20change or the benefits are shared. Step
- 19:01:23number three, evaluate the change.
- 19:01:25Clearly define the impact to the project
- 19:01:27baseline if the change is approved as
- 19:01:30written. Step number four, provide
- 19:01:33implementation options. How can this
- 19:01:35change be accomplished? Develop your
- 19:01:37team's recommended approach. And
- 19:01:39finally, step number five, document the
- 19:01:42decision and reasons why the decision
- 19:01:44was reached. Update all project
- 19:01:46documentation and communicate the
- 19:01:49change. With that, let's walk through an
- 19:01:52example of a change form. First of all,
- 19:01:55complete information to include the
- 19:01:57project stakeholder information and
- 19:02:00ensure a change ID is assigned.
- 19:02:04Next, ensure the proposed change is
- 19:02:08detailed at an appropriate level to
- 19:02:10ensure understanding of the request.
- 19:02:13This is accomplished by the requester
- 19:02:15and validated by the team.
- 19:02:19Ensure the reason for the change is
- 19:02:21described. This is also accomplished by
- 19:02:24the requesttor.
- 19:02:28Consider the impact to the project
- 19:02:29baseline and stakeholders. List
- 19:02:32assumptions, dependencies, risks, and
- 19:02:34define approval levels for the change.
- 19:02:40Define implementation options. Most
- 19:02:43changes will impact scope, schedule, and
- 19:02:45budget. Describe the impact for each
- 19:02:48potential option provided. Always ensure
- 19:02:51the team makes a recommendation on the
- 19:02:53most feasible option.
- 19:02:57Finally, document the decision. This may
- 19:03:00include accept asis, except with
- 19:03:02modifications, defer, reject, or
- 19:03:05recommend further analysis.
- 19:03:08Add notes to justify the decision, and
- 19:03:13use the closeout checklist to ensure the
- 19:03:15change is processed properly.
- 19:03:18>> In this video, you learned that a change
- 19:03:20request should include a request ID, a
- 19:03:23description, an evaluation of the change
- 19:03:25options, and then explain the decision.
- 19:03:32[Music]
- 19:03:33[Applause]
- 19:03:34[Music]
- 19:03:38Welcome to project closeout report.
- 19:03:41After watching this video, you will be
- 19:03:43able to describe the importance of a
- 19:03:45project closeout report and explain the
- 19:03:48steps involved in writing a project
- 19:03:50closeout report.
- 19:03:51>> Welcome to a brief demo on completing a
- 19:03:53final project closeout report.
- 19:03:57A project closeout report is important
- 19:03:59for a number of reasons.
- 19:04:02A project closeout report allows the
- 19:04:04team and future project managers to
- 19:04:06learn from both the mistakes and
- 19:04:09successes of a specific project. All too
- 19:04:12often, history in the form of mistakes
- 19:04:15repeats itself. In addition, best
- 19:04:18practices learned are often lost. A high
- 19:04:21quality closeout report will help
- 19:04:23improve future project performance.
- 19:04:26Project closure reports are also
- 19:04:28important because they serve as a basis
- 19:04:30to close contracts, release project
- 19:04:33resources, communicate final information
- 19:04:36to stakeholders, and plan the product or
- 19:04:39service transition.
- 19:04:41A project closeout report is documented
- 19:04:43to identify the variances from the
- 19:04:45baseline plans. This includes comparing
- 19:04:48plan performance to actual performance
- 19:04:51in the areas of scope, schedule, cost,
- 19:04:55and risk management.
- 19:04:57Let's do a quick report review.
- 19:05:01First of all, always date the report and
- 19:05:04provide key information to provide the
- 19:05:06project name. In addition, your division
- 19:05:08or department as applicable, the project
- 19:05:11sponsor, and the project manager.
- 19:05:15Next, review the project charter.
- 19:05:18Document the original goals of the
- 19:05:20project.
- 19:05:24Review each goal in the previous
- 19:05:26section. Evaluate your success or
- 19:05:29failure in achieving each goal. This is
- 19:05:32in essence your project report card.
- 19:05:39Next, review your project management
- 19:05:41plan. What was the original scope,
- 19:05:44schedule, and cost baselines?
- 19:05:47Compare what actually occurred on the
- 19:05:49project versus what was planned.
- 19:05:52Identify variances, and most
- 19:05:55importantly, provide ideas on how these
- 19:05:57variances can be avoided on future
- 19:06:00projects.
- 19:06:05Review your risk register. What risks
- 19:06:08did you predict accurately and how did
- 19:06:10your responses fare? In addition,
- 19:06:13document risks that caught you by
- 19:06:15surprise. How can these surprises be
- 19:06:18prevented in the future?
- 19:06:21Work with the team and document any
- 19:06:24outstanding issues that remain to be
- 19:06:26addressed. Do not close out the project
- 19:06:29totally until these issues are resolved.
- 19:06:37Lessons learned are next. Gather the
- 19:06:39team and document what went well, what
- 19:06:42you can do better next time, and provide
- 19:06:44any recommendations to improve. This
- 19:06:47activity will not help the current
- 19:06:49project in all likelihood, but it will
- 19:06:51help future project managers immensely.
- 19:06:58Determine where the report will be
- 19:07:00archived or filed. Find a repository
- 19:07:03where all project managers have access
- 19:07:05to the report. And finally, document
- 19:07:09when lessons learned were accomplished
- 19:07:11and when the project close out was 100%
- 19:07:14complete.
- 19:07:16Do, and I emphasize, do take the time to
- 19:07:19prepare and share this report. Overall
- 19:07:22project management within your
- 19:07:23organization will in all likelihood
- 19:07:26improve.
- 19:07:28In this video, you learn that project
- 19:07:30closeouts help the team learn from
- 19:07:32mistakes and successes, serve to
- 19:07:34communicate final information to
- 19:07:36stakeholders, and identify variances
- 19:07:38from baseline plans. When writing a
- 19:07:41project closeout, you should document
- 19:07:43the original goals of the project and
- 19:07:46evaluate the success of each goal.
- 19:07:48Provide advice on how variances can be
- 19:07:50avoided in the future. Document risks,
- 19:07:53explain lessons learned, and include the
- 19:07:56final 100% completion date.
- 19:08:03[Music]
- 19:08:09Welcome to personal portfolio
- 19:08:11development. After watching this video,
- 19:08:13you will be able to describe the
- 19:08:15elements of a personal portfolio.
- 19:08:18Welcome to a brief overview of how to
- 19:08:20develop a personal work portfolio. As we
- 19:08:24shared in an earlier reading, a personal
- 19:08:27portfolio is a great way to showcase
- 19:08:29your work and demonstrate you have the
- 19:08:31skills required to satisfy a potential
- 19:08:34job role. This short demo will provide
- 19:08:37an idea of what to include in your
- 19:08:39portfolio and how to format your
- 19:08:42presentation. A portfolio can be a hard
- 19:08:46copy document or an electronic one.
- 19:08:49Share your name, title, and contact
- 19:08:51information. Always include a picture.
- 19:08:55Try to share a variety of pictures
- 19:08:57throughout the portfolio.
- 19:09:00Provide a brief introduction. Tailor
- 19:09:02your introduction so it resonates with
- 19:09:05the audience you are sharing your
- 19:09:07portfolio with.
- 19:09:09Provide a brief agenda. You may wish to
- 19:09:12reference the slide or page number or
- 19:09:14turn this into a mini table of contents.
- 19:09:17Again, a picture is worth a thousand
- 19:09:20words and vary your pictures.
- 19:09:24The next section provides a miniature
- 19:09:26persona of yourself. Share your goals.
- 19:09:29If possible, try to share goals that the
- 19:09:31portfolio viewer might embrace as well.
- 19:09:34Express your values. Again, do your
- 19:09:37homework. What values do you possess
- 19:09:39that would be appreciated by the reader
- 19:09:42and the organization you are targeting?
- 19:09:45Share your likes. What drives you? What
- 19:09:48are you passionate about? Always ask
- 19:09:51yourself, how will my likes add value to
- 19:09:54the role I am seeking?
- 19:09:57Consider a quote that expresses your
- 19:09:59passion and values. This is optional.
- 19:10:02However, if you have a favorite quote or
- 19:10:04saying that matches the vision or values
- 19:10:06of the organization or role you are
- 19:10:08targeting, add it. Always include an
- 19:10:12overview of your education and
- 19:10:14certifications. You don't need to list
- 19:10:16everything. Determine which educational
- 19:10:19and certification particulars support
- 19:10:21the position you hope to attain.
- 19:10:24And list your job history. Share your
- 19:10:27last three or four roles that show you
- 19:10:30have the experience needed to take that
- 19:10:32next big career step. Share pictures of
- 19:10:36you on the job. Try to have a good mix
- 19:10:39of you working by yourself and with
- 19:10:41others. Choose pictures that show your
- 19:10:44passion, ability to effectively
- 19:10:46collaborate, and your professionalism on
- 19:10:48the job. Again, do your homework. Try to
- 19:10:52choose examples of your work that are
- 19:10:54meaningful to the portfolio reader and
- 19:10:57pertinent to the role you hope to
- 19:10:58attain. Try to limit this part of your
- 19:11:01portfolio to your hardesthitting top
- 19:11:03three examples.
- 19:11:05Describe the work. Share how this work
- 19:11:08provided positive results. And finally,
- 19:11:12share a link to the work. Give the
- 19:11:14reader an opportunity to view the work
- 19:11:16in detail. Here's another example of
- 19:11:19sharing your best work. This is example
- 19:11:22number two. And here is another example
- 19:11:25of you sharing your best work. This is
- 19:11:28example number three.
- 19:11:30Share references. Find individuals who
- 19:11:33work in meaningful positions willing to
- 19:11:36advocate for you. If possible, pictures
- 19:11:39add impact. You may wish to add contact
- 19:11:42information to these references as well.
- 19:11:46Provide a brief summary. Reiterate who
- 19:11:49you are, what you stand for, and the
- 19:11:52value you can bring to an organization.
- 19:11:54This is your final elevator pitch.
- 19:11:57Tailor this section to the audience.
- 19:12:01Always end with a thank you to those who
- 19:12:03took the time to review your portfolio.
- 19:12:06Reiterate your contact information and
- 19:12:09your smile.
- 19:12:11In this video, you learned elements of a
- 19:12:13personal portfolio may include contact
- 19:12:16information and a picture agenda or a
- 19:12:19table of contents. Develop a persona for
- 19:12:22yourself, overview of pertinent
- 19:12:24education and certifications,
- 19:12:27work samples representing your best
- 19:12:29work, and work samples that are
- 19:12:31pertinent to the role. references and an
- 19:12:34elevator pitch.
- 19:12:35[Music]
- 19:12:46Welcome to ré and job search tips. After
- 19:12:49watching this video, you will be able to
- 19:12:52summarize best practices in résé
- 19:12:54development, discuss best practices for
- 19:12:56effective job searching, describe
- 19:12:58additional activities to gain
- 19:13:00experience.
- 19:13:01Writing a resume can be a challenge. You
- 19:13:04need your resume to be impactful, share
- 19:13:06a compelling story, and capture the
- 19:13:08attention of the reader. Statistics show
- 19:13:11an average of 6 to 8 seconds is spent
- 19:13:13reviewing your resume. You need your
- 19:13:15resume to stand out. Here are a few tips
- 19:13:18to help you improve the impact of your
- 19:13:20resume. Write a résé objective. Begin
- 19:13:24with an accurate, brief, and concise
- 19:13:26objective that gives employers an idea
- 19:13:28of where you are on the career ladder.
- 19:13:30the role or position you're looking for
- 19:13:32and allows them to quickly determine if
- 19:13:35you are a good fit for the job. Tailor
- 19:13:37this objective to the job you are
- 19:13:39seeking. In addition, keep it short. One
- 19:13:42or two sentences will suffice. Carefully
- 19:13:45review the job description. Identify key
- 19:13:48words or phrases in the description. For
- 19:13:50example, if the job description requires
- 19:13:53excellent collaborative skills,
- 19:13:54highlight this in your resume. Outline
- 19:13:57skills and educational experience that
- 19:13:59maps to the job description. For
- 19:14:01example, if you are applying for a job
- 19:14:03as a business analyst, your
- 19:14:05undergraduate degree in history will
- 19:14:06likely have little impact. Rather, share
- 19:14:09that you attended a BA course and are
- 19:14:11studying for certification.
- 19:14:13Include both soft and technical skills.
- 19:14:16Be precise when listing technical
- 19:14:18skills. Key in on skills you possess
- 19:14:20that match those in the job description.
- 19:14:23Include volunteer work and participation
- 19:14:25in extracurricular activities that
- 19:14:27allowed you to gain experience and learn
- 19:14:29skills that translate well to the job
- 19:14:30you are applying for. Always include a
- 19:14:33cover letter. This letter should be
- 19:14:35brief and should include who you are,
- 19:14:38highlight relevant skills and
- 19:14:39experiences you possess that can be
- 19:14:41applied to the job, your interest in the
- 19:14:43position, knowledge of what the job
- 19:14:45entails, and how you can effectively
- 19:14:47fill the role. Show proof that you
- 19:14:49researched the company and understand
- 19:14:51their mission, vision, and needs. The
- 19:14:54job search process is both exciting and
- 19:14:57challenging. This process is necessary
- 19:14:59if you want to find a job that truly
- 19:15:01suits your needs. Here are a few tips to
- 19:15:03help you be successful. Determine what
- 19:15:06industry you want to work in, the roles
- 19:15:08you hope to fill, salary considerations,
- 19:15:10and the types of companies you prefer.
- 19:15:13Set a goal to determine how many
- 19:15:14companies you want to apply to in a
- 19:15:16given time period.
- 19:15:18Be selective. Have your plan and stick
- 19:15:20to it. No compromises.
- 19:15:23Understand the industry in which you
- 19:15:25want to work. Target your resume and
- 19:15:27cover letter to meet the needs of the
- 19:15:28job. Learn as much as you can about the
- 19:15:31company you are targeting. Know their
- 19:15:33mission, vision, and values. And know
- 19:15:36how you match their needs. Review job
- 19:15:38descriptions. Identify key skills,
- 19:15:41competencies, and certifications
- 19:15:43required to be selected for the
- 19:15:44position. Build your skills accordingly.
- 19:15:48A single resume will often not allow you
- 19:15:50to achieve your goals. Tailor your
- 19:15:52resume to meet the job description
- 19:15:53requirements.
- 19:15:55There are many outstanding job search
- 19:15:57sites. Create an account if necessary
- 19:15:59and learn to search by keywords. Sites
- 19:16:02such as Indeed, Zip Recruiter, Monster,
- 19:16:05LinkedIn, CareerBuilder, and more are
- 19:16:08widely used by prospective employers and
- 19:16:10are reputable. Plan to share a few
- 19:16:12stories to highlight your skills or
- 19:16:14problem solving abilities. Develop your
- 19:16:16own 60-second elevator pitch. Research
- 19:16:19common interview questions and prepare
- 19:16:20your responses before you go into the
- 19:16:22interview. Sign up for training,
- 19:16:25seminars, webinars, and conferences in
- 19:16:27your area or online to enhance your
- 19:16:29project management abilities.
- 19:16:32Find courses focusing on various aspects
- 19:16:34of project management or offer training
- 19:16:36in a particular skill you need help
- 19:16:38developing. Seek feedback from your
- 19:16:40peers. Get feedback from them. Share and
- 19:16:42ask for ideas and improve suggestions.
- 19:16:46Focus on various project management
- 19:16:48methodologies. Predictive project
- 19:16:50management is here to stay. However,
- 19:16:53agile and scrum methodologies are
- 19:16:54gaining traction. Improve competencies
- 19:16:57in all methodologies.
- 19:16:59Find project managers with proven
- 19:17:01success records and learn from them.
- 19:17:04There are many outstanding project
- 19:17:05managers in every industry. Find one who
- 19:17:08is willing to coach and mentor you.
- 19:17:11Join organizations such as the Project
- 19:17:13Management Institute, PMI, and the Scrum
- 19:17:15Alliance. Participate in meetings,
- 19:17:18training, and social gettogethers.
- 19:17:21Networking can help you land a job
- 19:17:22faster. It will also give you a
- 19:17:25competitive edge throughout every stage
- 19:17:26of your career. Experts agree that the
- 19:17:29most connected people are often the most
- 19:17:31successful. When you invest in your
- 19:17:33relationships and networking, both
- 19:17:35professional and personal, the time you
- 19:17:38spend will return high dividends
- 19:17:39throughout the course of your career. In
- 19:17:42this video, you learn that when
- 19:17:44developing a resume, you should write an
- 19:17:46objective, summarize skills, and
- 19:17:48pertinent education at the top. Tailor
- 19:17:50it to the job. Include a cover letter.
- 19:17:53When searching for a job, you should
- 19:17:55have a plan and stick to it. Understand
- 19:17:58the industry. Build your skill set. Use
- 19:18:00reputable social media. Practice your
- 19:18:03interviewing. Additional activities
- 19:18:05might include seeking feedback, job
- 19:18:08shadowing, joining organizations, and
- 19:18:10networking.
- 19:18:16[Music]
- 19:18:19Hello everyone and welcome to our
- 19:18:21certified associate and project
- 19:18:23management exam preparation course. My
- 19:18:26name is Daniel Yman's and I will be the
- 19:18:28primary instructor for you during this
- 19:18:31journey. This certification will show
- 19:18:34potential employers that you are ready
- 19:18:36to take on new challenges. It will also
- 19:18:40be an achievement that you can take
- 19:18:41great personal pride in. The Project
- 19:18:44Management Institute or PMI states, "The
- 19:18:47Certified Associate of Project
- 19:18:49Management, known as CAPM, is a globally
- 19:18:53recognized credential that will open the
- 19:18:56door for you at any stage of your career
- 19:18:59in project management. This course is
- 19:19:02designed for those who have completed
- 19:19:04the training required for the CAPM exam
- 19:19:07certification and for those familiar
- 19:19:10with the project management body of
- 19:19:12knowledge sixth and seventh edition and
- 19:19:16those who have completed 23 hours of
- 19:19:18training from courses such as the IBM IT
- 19:19:22project management professional
- 19:19:24certificate, the IBM project management
- 19:19:27professional certificate or the skillup
- 19:19:30modern Project Management
- 19:19:32Specialization. This course begins with
- 19:19:34a summary of the requirements for the
- 19:19:37CAPM certification exam, including
- 19:19:41education, experience, and cost. Now,
- 19:19:45you will hear about what this course
- 19:19:47will do for you. After this course, you
- 19:19:50will be able to describe the process for
- 19:19:54registering for the CAPM certification
- 19:19:57exam. Next, you will learn how to
- 19:19:59describe the CAPM exam information,
- 19:20:03including exam questions, question
- 19:20:05types, and the exam process. We provide
- 19:20:09insight into what to expect on exam day.
- 19:20:12You will learn about the four domains on
- 19:20:15which the Kappam exam is based and the
- 19:20:18percentage of questions from each
- 19:20:19domain. A domain is a broad category of
- 19:20:23related topics. The course will share
- 19:20:25study sources and testing tips. We will
- 19:20:28give you tips on how to best prepare for
- 19:20:31the exam. You will be provided with many
- 19:20:33tests to check your readiness in each
- 19:20:36domain of the CAPM exam. And finally, in
- 19:20:40this course, you will practice for the
- 19:20:42CAPM certification exam by completing a
- 19:20:47150 question mock exam within 3 hours.
- 19:20:50This exam simulates the types of
- 19:20:52questions you can expect on the actual
- 19:20:55exam. So, good luck in your journey. Do
- 19:20:59the best you can and we'll see you at
- 19:21:02your destination when you proudly share
- 19:21:05your CAPM certification. Good luck.
- 19:21:11[Music]
- 19:21:19Welcome to information on the CAPM exam.
- 19:21:22After watching this video, you'll be
- 19:21:24able to describe the four types of
- 19:21:25questions on the CAPM exam. Watch this
- 19:21:28video for information on the CAPM exam,
- 19:21:30including the number of questions and
- 19:21:32the various types of questions that you
- 19:21:33may expect. The CAPM certification exam
- 19:21:36consists of 150 questions. A total of
- 19:21:40135 questions are graded. There are 15
- 19:21:42unscored questions. You will not know
- 19:21:44which questions will not be scored.
- 19:21:46Answer all 150 questions to the best of
- 19:21:49your ability. The passing score 70%. The
- 19:21:52pre-EST questions are used to validate a
- 19:21:54question to be included in the scored
- 19:21:56portion of the test. They also allow the
- 19:21:58project management institute PMI to ask
- 19:22:00questions about new project management
- 19:22:02practices not yet included in the
- 19:22:04project management body of knowledge,
- 19:22:06pimach, to measure the current awareness
- 19:22:08levels in the field. You will encounter
- 19:22:10four types of question formats on the
- 19:22:12CAPM certification exam. The first type
- 19:22:14of question format is multiple choice.
- 19:22:17You'll be asked the question and asked
- 19:22:18to select one or two best options. For
- 19:22:20example, the question says who approves
- 19:22:22the project charter? And the options are
- 19:22:24option A project manager, option B,
- 19:22:26sponsor, option C, product owner, and
- 19:22:29option D CEO. The correct answer is
- 19:22:31option B sponsor. The second type of
- 19:22:34question format is a hotspot. You'll be
- 19:22:36shown a graphic that contains A, B, C,
- 19:22:38and D in the graphic and asked to answer
- 19:22:40a question based on. To answer, you must
- 19:22:42select the best hotspot option on the
- 19:22:44graphic. For example, the question says,
- 19:22:46review the graphic, match the project to
- 19:22:48the appropriate life cycle based on the
- 19:22:51frequency of delivery and degree of
- 19:22:53change factors. Then you need to analyze
- 19:22:55the graphic and place the best matching
- 19:22:57letter from the graphic into the
- 19:22:58question descriptor. The third type of
- 19:23:01question format is enhanced matching.
- 19:23:03You will be given a series of tiles to
- 19:23:05match their description or put in a
- 19:23:07correct sequence. To answer, you must
- 19:23:08drag a tile to its matching description
- 19:23:10or correct sequential position.
- 19:23:14The fourth and last type of question
- 19:23:15format is animation videos or comic
- 19:23:17strips. You'll be given an animated
- 19:23:19video or comic strip and asked to answer
- 19:23:21a question based on it. To answer, you
- 19:23:23must select one or two best options.
- 19:23:26This question type is similar to
- 19:23:27multiple choice except that you are
- 19:23:28given a video or a comic strip rather
- 19:23:30than text. In this video, you learned
- 19:23:33that the four types of questions on the
- 19:23:35CAPM exam include multiple choice,
- 19:23:37hotspot, enhanced matching, animation,
- 19:23:40or comic strip.
- 19:23:43[Music]
- 19:23:51Welcome to exam taking strategies. After
- 19:23:54watching this video, you'll be able to
- 19:23:56explore effective exam strategies for
- 19:23:58certification exams and learn how to
- 19:24:00implement these strategies.
- 19:24:02Certification exams are designed to
- 19:24:03assess your knowledge and skills in a
- 19:24:05specific field or industry, serving as
- 19:24:07valuable credentials that demonstrate
- 19:24:09your expertise and proficiency to
- 19:24:11employers, clients, and colleagues.
- 19:24:12However, preparing for a certification
- 19:24:14exam can be a challenging and
- 19:24:16overwhelming task. That's where these
- 19:24:18strategies come in. They will help you
- 19:24:20streamline your preparation, improve
- 19:24:22your performance during the exam, and
- 19:24:23maximize your chances of success. These
- 19:24:26strategies are divided into three
- 19:24:27categories. Exam preparation, strategies
- 19:24:30during the exam, and post-exam pointers.
- 19:24:33Each category addresses different stages
- 19:24:35of your certification journey, and
- 19:24:37provides guidance on how to navigate
- 19:24:38them effectively. Let's take a closer
- 19:24:40look at each category and the strategies
- 19:24:42within them. The exam preparation
- 19:24:44strategies focus on establishing a solid
- 19:24:46foundation for your exam readiness.
- 19:24:48Firstly, it's crucial to familiarize
- 19:24:50yourself with the official exam
- 19:24:52objectives as they outline the specific
- 19:24:54topics and knowledge areas that will be
- 19:24:55covered in the exam. These objectives
- 19:24:57should be used as a study guide to
- 19:24:59ensure comprehensive coverage of all the
- 19:25:01necessary material. Next, use a diverse
- 19:25:04range of study resources, including
- 19:25:05textbooks, online courses, practice
- 19:25:07exams, and official study materials.
- 19:25:09These resources offer comprehensive
- 19:25:12coverage of the exam content and allow
- 19:25:13you to assess your readiness through
- 19:25:15practice questions and simulations. In
- 19:25:17addition, develop a well ststructured
- 19:25:19study plan encompassing all the exam
- 19:25:21objectives. Allocate dedicated study
- 19:25:23time and distribute it wisely across
- 19:25:25different topics. Break down your study
- 19:25:27sessions into manageable segments to
- 19:25:29facilitate effective comprehension and
- 19:25:31retention of the material. Engaging in
- 19:25:34practice exams and sample questions is
- 19:25:36another essential strategy. This will
- 19:25:38acquaint you with the exam format and
- 19:25:40question types, enabling you to become
- 19:25:42familiar with the exams wording,
- 19:25:43structure, and timing. Practicing within
- 19:25:46a timed environment can improve your
- 19:25:47speed and accuracy in answering
- 19:25:49questions. Aim for an average of one
- 19:25:51minute per question during these
- 19:25:53practice sessions. Lastly, reinforce
- 19:25:55your understanding by regularly
- 19:25:57reviewing the material you have studied.
- 19:25:59Pay particular attention to areas where
- 19:26:01you may feel weaker or less confident.
- 19:26:03Utilize tools such as flashcards,
- 19:26:05summaries, and pneummonic techniques to
- 19:26:07aid in retention and recall. To gauge
- 19:26:09your level of preparedness, aim for an
- 19:26:11average score of 80% on your practice
- 19:26:13exams, ensuring you are thoroughly
- 19:26:15prepared and ready to excel in the
- 19:26:17actual exam. Let's now delve into the
- 19:26:19strategies to follow during the exam.
- 19:26:21These strategies provide valuable
- 19:26:23insights into how to approach the actual
- 19:26:25exam. Firstly, it's crucial to manage
- 19:26:27your time effectively during the exam.
- 19:26:29Read each question carefully and if
- 19:26:31needed, flag difficult questions to
- 19:26:32revisit later. Start by answering the
- 19:26:34questions you're confident about and
- 19:26:36then allocate the remaining time to the
- 19:26:38more challenging ones. It's important to
- 19:26:40avoid spending excessive time on a
- 19:26:42single question. If you're still trying
- 19:26:44to decide on an answer, employ the
- 19:26:45process of elimination to rule out
- 19:26:47obviously incorrect options. This
- 19:26:49increases your chances of selecting the
- 19:26:51correct answer. Remember not to leave
- 19:26:53any questions unanswered. Next,
- 19:26:55maintaining a calm and focused mindset
- 19:26:57throughout the exam is essential.
- 19:26:59Practice deep breathing techniques to
- 19:27:01manage test anxiety and carefully read
- 19:27:03each question. Take the time to fully
- 19:27:05understand the question by reading it in
- 19:27:07its entirety. Familiarize yourself with
- 19:27:09the different question types you may
- 19:27:11encounter in the exam, such as multiple
- 19:27:13choice, drag and drop, or
- 19:27:14performance-based questions. Each type
- 19:27:16may require a slightly different
- 19:27:18approach, so understanding the nuances
- 19:27:20will aid your preparation. If you
- 19:27:22encounter an ambiguous or unclear
- 19:27:24question, feel free to seek
- 19:27:25clarification. Raise your concern with
- 19:27:27the exam proctor or contact the relevant
- 19:27:30authority for further guidance. Remember
- 19:27:32that each question carries the same
- 19:27:34number of points and there are no
- 19:27:35weighted questions. Give each question
- 19:27:37the same level of attention and effort.
- 19:27:40Taking regular breaks to refresh your
- 19:27:42mind is crucial. For example, after
- 19:27:44every 25 questions, reward yourself with
- 19:27:46a one minute thinking break. Utilize
- 19:27:48this time to relax, think positively,
- 19:27:50take a few deep breaths, and even smile.
- 19:27:52Visualize yourself successfully
- 19:27:54completing the exam and achieving a
- 19:27:55passing score. Lastly, before submitting
- 19:27:58your exam, review your answers and
- 19:27:59double check for any errors or
- 19:28:01omissions. Ensure that you have answered
- 19:28:02all questions and made any necessary
- 19:28:04corrections. The post exam pointers
- 19:28:06category focuses on what to do after
- 19:28:08completing the exam. Firstly, it's
- 19:28:10important to periodically check for any
- 19:28:12updates or changes to the exam
- 19:28:14objectives, content, or format. Stay
- 19:28:16informed about industry trends and
- 19:28:18relevant technological advancements to
- 19:28:20the exam. Next, consider engaging with
- 19:28:22others who are also preparing for the
- 19:28:24same exam by joining study groups or
- 19:28:26online forums. Collaborating with peers
- 19:28:28allows for discussing concepts,
- 19:28:30clarifying doubts, and gaining different
- 19:28:32perspectives. Lastly, take the time to
- 19:28:34understand the certification renewal and
- 19:28:36validity policies, and any requirements
- 19:28:38for continuing education associated with
- 19:28:40the certification you're pursuing. This
- 19:28:42knowledge will ensure that you stay
- 19:28:44informed about maintaining and enhancing
- 19:28:46your certification. Whether you're
- 19:28:48preparing for a technical certification,
- 19:28:49a professional qualification, or any
- 19:28:51other type of certification exam, these
- 19:28:53strategies will serve as valuable
- 19:28:55guidelines to help you excel. By
- 19:28:57incorporating these strategies into your
- 19:28:59exam preparation, you can enhance your
- 19:29:01readiness, boost your confidence, and
- 19:29:03increase your chances of achieving
- 19:29:04success in your certification exam. In
- 19:29:07this video, you learned how to
- 19:29:08familiarize yourself with the specific
- 19:29:10topics and knowledge areas outlined in
- 19:29:12the exam objectives. Engage in practice
- 19:29:15exams to become familiar with the exam
- 19:29:17format and question types and improve
- 19:29:19speed and accuracy. Read questions
- 19:29:22carefully. Answer confident ones first
- 19:29:23and allocate time for challenging ones.
- 19:29:26Double check answers, correct errors or
- 19:29:28omissions, and ensure all questions are
- 19:29:29answered. Periodically check for updates
- 19:29:31in exam objectives, content, and format
- 19:29:33to stay informed and understand the
- 19:29:36policies and requirements for
- 19:29:37maintaining your certification.
- 19:29:42[Music]
- 19:29:47[Applause]
- 19:29:47[Music]
- 19:29:52Welcome to this course where you will
- 19:29:53learn about project management careers
- 19:29:55and get started with applying and
- 19:29:57interviewing for project manager jobs.
- 19:30:00Did you know according to a project
- 19:30:02manager institute PMI report there will
- 19:30:05be 25 million project management jobs
- 19:30:07globally with 2.3 million new jobs every
- 19:30:10year soon. Project management careers
- 19:30:13are not only in demand but can be
- 19:30:15challenging and equally rewarding. Are
- 19:30:18you excited and ready to find project
- 19:30:20management related jobs?
- 19:30:22This course will help you start your
- 19:30:24project management job search with a
- 19:30:26step-by-step approach to job search
- 19:30:28preparation and interviewing. This
- 19:30:30course will equip you with best
- 19:30:32practices and expert viewpoints. This
- 19:30:34course aims to prepare you to enter the
- 19:30:36job market confidently and easily.
- 19:30:40This 5-week course welcomes anyone who
- 19:30:42loves to learn or is interested in a
- 19:30:44project management career.
- 19:30:46Prior project management knowledge is
- 19:30:48optional. You should grasp computer
- 19:30:50basics and have access to a computer
- 19:30:52capable of running modern web browsers
- 19:30:54with a reliable internet connection.
- 19:30:57This course comprises five modules. The
- 19:30:59content is designed so that the
- 19:31:01recommendation is for you to spend about
- 19:31:033 to 4 hours each week until you
- 19:31:05complete all modules. However, you can
- 19:31:07complete it in a shorter or longer time
- 19:31:09frame.
- 19:31:11Module one, building a foundation, will
- 19:31:13introduce you to the role of a project
- 19:31:15manager and the different titles that
- 19:31:17need project management experience. You
- 19:31:20will then experience and apply the best
- 19:31:22practices to create an essential
- 19:31:23portfolio and an elevator pitch. In
- 19:31:27module two, identifying jobs, creating
- 19:31:29résumés, and drafting cover letters, you
- 19:31:32will acquire skills to search for job
- 19:31:34postings, and develop a basic resume and
- 19:31:36cover letter along with some best
- 19:31:38practices for each.
- 19:31:40Module three, the interview process,
- 19:31:42will take you through the different
- 19:31:44stages of the interview process. You
- 19:31:46will learn about what to expect during
- 19:31:48the various stages of the interview.
- 19:31:50Also, you will learn how to respond to
- 19:31:51questions using the STAR technique.
- 19:31:54Module four, understanding interview
- 19:31:56questions and post-in steps is all about
- 19:31:59the different types of interview
- 19:32:01questions. You will view mock
- 19:32:03interviews. Finally, you will learn what
- 19:32:05to do if you do or don't receive a job
- 19:32:07offer. In the final module, you can
- 19:32:10practice with an optional project on
- 19:32:12applying for a project management
- 19:32:14position. The final quiz will help you
- 19:32:17assess your overall understanding of the
- 19:32:18content.
- 19:32:20You will now hear the project management
- 19:32:22experts introduce themselves, their
- 19:32:24current role and the company.
- 19:32:26>> My name is Daniel Yman's there. I go by
- 19:32:29Dan. Currently, I am employed as a
- 19:32:32subject matter expert for Skillup
- 19:32:34Technologies developing a lot of courses
- 19:32:37in both project management and product
- 19:32:40management. I also am a instructor for
- 19:32:46about three universities here locally.
- 19:32:49uh Green River College, Belleview
- 19:32:51College, and South Seattle Colleges
- 19:32:53where I do a lot of corporate training.
- 19:32:55And in addition, I also teach
- 19:32:57undergraduate and graduate level courses
- 19:32:59at Northwest University.
- 19:33:02>> Hello, my name is Casey Kyle and I
- 19:33:05currently am a subject matter expert
- 19:33:08content creator for Scaleup
- 19:33:10Technologies. I've got about 10 years of
- 19:33:12experience in product management,
- 19:33:15project management, uh technical
- 19:33:18consulting, and product marketing. Uh my
- 19:33:21name is Kristen Pollson and I work for
- 19:33:24Skilup Technologies. I'm the director of
- 19:33:26customer success. Uh but I wear a lot of
- 19:33:29different hats at Skillup. Um, since
- 19:33:31I've been with Skillup, I started as a
- 19:33:33project manager and then transitioned
- 19:33:35into a management role and I currently
- 19:33:37lead a team of 100 plus people around
- 19:33:40the world.
- 19:33:41>> Hi, my name is Paul Partardi. Um, I
- 19:33:43currently work for the Skillup
- 19:33:45organization. Um, in the past I've
- 19:33:48worked for Microsoft. I worked for
- 19:33:49Microsoft for a couple of decades and I
- 19:33:52did work that ranged from content
- 19:33:54development to um, software engineering
- 19:33:57at Microsoft. And after Microsoft, I
- 19:34:00worked at PayPal for a few years and I
- 19:34:02was a director of um of merchant content
- 19:34:06for for PayPal for all the UI elements
- 19:34:08for the merchant side of the business
- 19:34:10and um then I've gotten into um other
- 19:34:13work doing content development as well
- 19:34:15as web development.
- 19:34:17>> Hello, my name is Ben Flower and I'm the
- 19:34:20director of human skills at SkillUp
- 19:34:23Technologies.
- 19:34:25>> There's a lot to cover here. To get the
- 19:34:27most from this course, make sure to go
- 19:34:30through the concept and expert viewpoint
- 19:34:32videos, review the readings, complete
- 19:34:35all hands-on labs, check your
- 19:34:37understanding with graded quizzes. If
- 19:34:40you have any trouble with the course
- 19:34:42material, please don't hesitate to
- 19:34:43contact us in the discussion forum. We
- 19:34:46hope you enjoy this learning journey
- 19:34:48with us. Let's get started.
- 19:34:53Imagine
- 19:34:55[Music]
- 19:35:02a symphony where different musicians
- 19:35:03play their instruments at their own
- 19:35:05pace, harmony, and time. The symphony
- 19:35:08can be a disaster. An orchestra
- 19:35:10conductor helps align the musicians to
- 19:35:12play in sync with proper timing and
- 19:35:14harmony. Similar to the orchestra
- 19:35:16conductor, a project manager's role must
- 19:35:19align all resources to achieving project
- 19:35:22objectives.
- 19:35:23Welcome to role of the project manager.
- 19:35:26After watching this video, you'll be
- 19:35:28able to summarize the role and
- 19:35:30responsibilities of a project manager.
- 19:35:33List the key areas of knowledge required
- 19:35:35to be a successful project manager.
- 19:35:37Explain the PMI talent triangle.
- 19:35:40By definition, a project manager is an
- 19:35:43individual assigned to lead the team
- 19:35:45responsible for achieving all project
- 19:35:47objectives. A project manager applies
- 19:35:49the knowledge, skills, and tools
- 19:35:52necessary to ensure all project
- 19:35:54activities are completed to support the
- 19:35:56project. A project manager is
- 19:35:58accountable and responsible for
- 19:36:00initiating, planning, executing,
- 19:36:03monitoring, and controlling and closing
- 19:36:05the project. A project manager is also
- 19:36:08responsible for on-time and within
- 19:36:10budget delivery of project deliverables
- 19:36:12while conforming to customer
- 19:36:13requirements. Further, the project
- 19:36:16manager is responsible for monitoring
- 19:36:18any scope creep. The project manager is
- 19:36:21also responsible for ensuring the
- 19:36:23project provides value when completed. A
- 19:36:26project manager must also be adept with
- 19:36:29certain skills. These are described by
- 19:36:31the 10 key project management areas of
- 19:36:33knowledge as documented by the project
- 19:36:36management institute PMI.
- 19:36:38These areas address different aspects of
- 19:36:41project management that a project
- 19:36:42manager must manage throughout the
- 19:36:44project. The first area of knowledge is
- 19:36:47integration management. A project
- 19:36:50manager must understand all variables
- 19:36:52that impact a project and ensure they
- 19:36:54are addressed and balanced. Project
- 19:36:57scope, schedule, and cost management are
- 19:37:00areas of knowledge that are essential to
- 19:37:02develop a viable project baseline.
- 19:37:05Further, to drive project support
- 19:37:07functions, the project manager must be
- 19:37:09well-versed in the areas of quality,
- 19:37:12resource management, communications,
- 19:37:14risk, and procurement.
- 19:37:17Finally, the project manager must be
- 19:37:19equipped with skills for stakeholder
- 19:37:21management, which is the most
- 19:37:23challenging area.
- 19:37:24The skills can be broadly divided into
- 19:37:26three categories. Way of working, power
- 19:37:29skills, and business acumen. These three
- 19:37:32skill categories are included in a tool
- 19:37:34developed by PMI named the PMI talent
- 19:37:37triangle. Let's briefly look at the
- 19:37:39categories.
- 19:37:41ways of working is described on the PMI
- 19:37:43website as quote whether it's
- 19:37:45predictive, agile, design thinking or
- 19:37:48new practices still to be developed.
- 19:37:50It's clear that there is more than one
- 19:37:52way that work gets done today. That's
- 19:37:55why we encourage professionals to master
- 19:37:57as many ways of working as they can so
- 19:37:59they can apply the right technique at
- 19:38:01the right time delivering winning
- 19:38:03results. Some key skills that are part
- 19:38:05of this category include agile and
- 19:38:08hyperaggile, hybrid, design thinking,
- 19:38:12transformation, data gathering and
- 19:38:14modeling, earned value management, EVM,
- 19:38:18governance, performance management,
- 19:38:20requirements management and
- 19:38:22traceability, risk management, schedule
- 19:38:25management, and time, budget and cost
- 19:38:28estimations.
- 19:38:30power skills according to the PMI
- 19:38:33states, quote, "These interpersonal
- 19:38:35skills include collaborative leadership,
- 19:38:37communication, and innovative mindset,
- 19:38:39forpurpose orientation, and empathy.
- 19:38:42Ensuring teams have these skills allows
- 19:38:44them to maintain influence with a
- 19:38:46variety of stakeholders. A critical
- 19:38:48component for making change. Some key
- 19:38:51skills in this category include
- 19:38:53leadership, active listening,
- 19:38:56communications, adaptability,
- 19:38:58brainstorming, coaching and mentoring,
- 19:39:01conflict management, emotional
- 19:39:03intelligence, influencing, interpersonal
- 19:39:06skills, negotiation, problem solving,
- 19:39:10teamwork.
- 19:39:11The third skill category is business
- 19:39:13acumen. PMI states, "Professionals with
- 19:39:17business acumen understand the macro and
- 19:39:19micro influences in their organization
- 19:39:21and industry and have the function
- 19:39:23specific or domain specific knowledge to
- 19:39:25make good decisions.
- 19:39:27Professionals at all levels need to be
- 19:39:29able to cultivate effective decision-m
- 19:39:32and understand how their projects align
- 19:39:34with the big picture, a broader
- 19:39:35organizational strategy and global
- 19:39:37trends. Some key skills in this category
- 19:39:40include benefits management and
- 19:39:42realization, business models and
- 19:39:44structures, competitive analysis,
- 19:39:47customer relationships and satisfaction,
- 19:39:50industry domain knowledge,
- 19:39:52legal and regulatory compliance, market
- 19:39:55awareness, function specific knowledge,
- 19:39:58and strategic planning analysis
- 19:40:00alignment.
- 19:40:02In this video, you learned that the
- 19:40:04project manager is responsible for
- 19:40:06driving the team to achieve project
- 19:40:08objectives, accountable for all phases
- 19:40:10of the project, including initiating,
- 19:40:13planning, executing, monitoring,
- 19:40:15controlling, and closing. Responsible
- 19:40:18for project deliverables, quality, time,
- 19:40:21and customer requirement conformance.
- 19:40:24Adept in 10 areas of knowledge required
- 19:40:26to manage a project. Skills and
- 19:40:29competencies a project manager must
- 19:40:31possess can be divided into three
- 19:40:33categories as defined by the PMI talent
- 19:40:35triangle. Ways of working, power skills,
- 19:40:38and business acumen.
- 19:40:40[Music]
- 19:40:51Welcome to expert viewpoints project
- 19:40:54manager roles and skills.
- 19:40:56In this video, industry professionals
- 19:40:58explain the most critical roles and
- 19:41:00responsibilities for project managers
- 19:41:02and describe the top skills necessary
- 19:41:04for professional success.
- 19:41:08If you talk to any project manager and
- 19:41:10ask them briefly to describe their role,
- 19:41:13they essentially turn great ideas into
- 19:41:16reality. And they take these ideas and
- 19:41:19they try to implement them on time,
- 19:41:21within budget, and providing value to
- 19:41:24the customer. One of the things that the
- 19:41:26project manager does as part of their
- 19:41:28job is to manage the project from end to
- 19:41:32end. They initiate the project and plan
- 19:41:34the project. They use that plan to
- 19:41:37execute the project. They monitor and
- 19:41:39control to make sure that the plan is
- 19:41:41working and if everything is working
- 19:41:44well, they close out the project
- 19:41:45successfully and transition the product
- 19:41:47or service to a customer. If not, then
- 19:41:50they have to go back and fix it.
- 19:41:52So, one of the things that's unique
- 19:41:54about the project manager role is
- 19:41:56there's a lot of skills and uh
- 19:41:58capabilities that need to come into
- 19:42:00play. Um, I won't go through a whole
- 19:42:02long list, but some of the ones that
- 19:42:05come to my mind would be communication.
- 19:42:07It's it's critical that you're able to
- 19:42:09communicate effectively with everybody
- 19:42:10on the team because you're going to be
- 19:42:12in a constant state of communication,
- 19:42:14getting updates, and managing deadlines.
- 19:42:17You you also need to be able to from a
- 19:42:19project management standpoint identify
- 19:42:21the goals even before you get started so
- 19:42:23everybody has a common clear path as to
- 19:42:25where they're going where they need to
- 19:42:27be and the timelines associated with
- 19:42:29that.
- 19:42:30>> I think the most critical roles and
- 19:42:32responsibilities of a project manager
- 19:42:34are on timeline aligning to budgetary
- 19:42:38constraints and then quality the three
- 19:42:40pillars of project management. Um, if
- 19:42:43you get down into the weeds, it's really
- 19:42:45going to come down to communication,
- 19:42:47ensuring that everybody's always on the
- 19:42:49same page, staying on top of any
- 19:42:52transactional elements of the project,
- 19:42:54and then making sure that your
- 19:42:56stakeholders are well informed.
- 19:42:58The most critical roles and
- 19:43:00responsibilities of a project manager
- 19:43:02are to lead the team through the project
- 19:43:05management life cycle, lead the project
- 19:43:08team through the project management life
- 19:43:10cycle. So what that looks like and what
- 19:43:12responsibilities that a project manager
- 19:43:14would have are really to plan and define
- 19:43:18the project and do things like planning
- 19:43:21the budget, uh doing a timeline and a
- 19:43:25and a plan for how the time's going to
- 19:43:27be spent, doing resource planning and uh
- 19:43:30looking at how the project is going to
- 19:43:32actually be completed. And during the
- 19:43:35project, a project manager is
- 19:43:37responsible for managing those things.
- 19:43:40So managing the timeline, making sure
- 19:43:43that people are uh getting things done
- 19:43:46on time and also managing the cost and
- 19:43:50the budget of the project as well as the
- 19:43:53quality of the work that's being done.
- 19:43:55And finally, a project manager is
- 19:43:58responsible for communicating with
- 19:44:00stakeholders and mitigating risks and
- 19:44:03issues. So doing communication not only
- 19:44:06with the project team but anybody who is
- 19:44:09involved in the project or who might
- 19:44:12need to be uh informed about the project
- 19:44:15the project manager would communicate
- 19:44:18with them and then managing risk.
- 19:44:28Let's break project management skills
- 19:44:29into two areas. First of all technical.
- 19:44:32As a project manager, you need to
- 19:44:34understand various project management
- 19:44:37frameworks or methodologies. You need to
- 19:44:39be knowledgeable of what we call
- 19:44:41predictive methodologies, which is
- 19:44:43building to the plan. This is
- 19:44:45traditional project management such as
- 19:44:46waterfall. But it doesn't hurt to have
- 19:44:49an understanding of agile methodologies
- 19:44:52as well, such as scrum. more and more
- 19:44:55both agile and predictive project
- 19:44:58management is being used and sometimes
- 19:45:00it's being used in a hybrid method as
- 19:45:02well. So have an understanding of those
- 19:45:04particular frameworks. The second set of
- 19:45:06skills that you require are the
- 19:45:08interpersonal skills. Let's break them
- 19:45:10into three areas. First and foremost,
- 19:45:13communications. Communications is the
- 19:45:15glue that holds the project together.
- 19:45:17You need to really try to perfect your
- 19:45:19communication skills. These include
- 19:45:21things such as facilitation,
- 19:45:23collaboration, you name it. In addition,
- 19:45:26your leadership and management skills
- 19:45:28are important as well. Yes, your title
- 19:45:31is project manager, but we could
- 19:45:33probably name your title to project
- 19:45:34leader as well because you have to set
- 19:45:37the vision for the project. You have to
- 19:45:39get people excited about the project and
- 19:45:41you have to make sure that they are
- 19:45:42committed to do what they need to do.
- 19:45:44But however, you need to also be able to
- 19:45:47manage your resources and make sure that
- 19:45:49you are using them efficiently and
- 19:45:50effectively.
- 19:45:52>> The skills that are required for that
- 19:45:54are a mix of communication, um,
- 19:45:57confidence and boldness and not being
- 19:45:59shy of interacting with your client and
- 19:46:01interacting with your stakeholders and
- 19:46:03your management team. And then also the
- 19:46:06attention to detail to ensure that
- 19:46:08everything that you're managing, no
- 19:46:10matter how chaotic, how crazy, is always
- 19:46:14documented properly and shared properly
- 19:46:16amongst the team.
- 19:46:18>> For a project manager, one of the most
- 19:46:20important skills I think is analytic
- 19:46:22skills. Being able to look at the entire
- 19:46:25project and all the people working on
- 19:46:27that project and sorting out um where
- 19:46:30there's going to be friction, where
- 19:46:31there's going to be problems, and what's
- 19:46:33working well. So as you're doing the
- 19:46:35work of a project manager, you're
- 19:46:37constantly daily, maybe even hourly
- 19:46:40looking at, you know, the dynamics of
- 19:46:41the group, the dynamics of the team, and
- 19:46:45the dynamics of the deliverables and
- 19:46:46sorting out all of those um all of those
- 19:46:49aspects and then applying, you know,
- 19:46:51your skills as a project manager to keep
- 19:46:53those things moving.
- 19:46:55Um, but leadership, you know, when you
- 19:46:57think about leadership, you have a team
- 19:46:59of individuals that has all of their
- 19:47:01requirements and responsibilities. And
- 19:47:03as a project manager, you're a leader to
- 19:47:06bring all these people together to a
- 19:47:08similar goal and a similar process. Um,
- 19:47:11there's a lot of negotiation skills
- 19:47:13required as you're talking with
- 19:47:15individuals, talking about deadlines,
- 19:47:16and making sure that they're able to get
- 19:47:19their projects completed. I would also
- 19:47:21then mention quickly time management.
- 19:47:23You need to be able to be very clear on
- 19:47:25timelines, what the expectations are,
- 19:47:28and make sure everybody is lockep as you
- 19:47:30move together as a team to hit those
- 19:47:32goals and timelines.
- 19:47:35[Music]
- 19:47:46Welcome to IBM Project Manager
- 19:47:49Professional Certificates. Whether you
- 19:47:51want to start or change your current
- 19:47:53career, professional certificates can
- 19:47:55help you become job ready. You can
- 19:47:57easily afford and complete a
- 19:47:59professional certificate faster than a
- 19:48:01traditional college degree. IBM provides
- 19:48:04two project manager certificate programs
- 19:48:06designed and built to help enhance your
- 19:48:08project management skills. These
- 19:48:10programs are IBM project manager
- 19:48:13professional certificate and IBM IT
- 19:48:16project manager professional
- 19:48:17certificate. IBM designed the IBM
- 19:48:20Project Manager and IT Project Manager
- 19:48:23professional certificate programs for
- 19:48:24beginners with no prior experience in
- 19:48:26project management. With a comprehensive
- 19:48:29curriculum, hands-on learning, a
- 19:48:31portfolio to showcase your expertise,
- 19:48:33and an industry recognized
- 19:48:34certification, these programs prepare
- 19:48:37you for a rewarding career. The courses
- 19:48:39in this program cover various topics and
- 19:48:41job ready skills required for an
- 19:48:43entry-level project manager role. Both
- 19:48:45professional certificates share common
- 19:48:47topics including basics of project
- 19:48:49management, initiation and planning,
- 19:48:52information sharing and risk management,
- 19:48:54communications, stakeholder management
- 19:48:57and leadership and agile development and
- 19:48:59scrum basics. The capstone project will
- 19:49:02help you test your skills and provide an
- 19:49:04opportunity to add another project to
- 19:49:06your portfolio. The certificate program
- 19:49:08will help you prepare for the certified
- 19:49:10associate project manager CAPM
- 19:49:12certification exam. The IT project
- 19:49:15manager professional certificate is for
- 19:49:17individuals interested in pursuing a
- 19:49:19role in the information technologies IT
- 19:49:21industry. Therefore, to ensure that
- 19:49:24learners are fully equipped, this
- 19:49:26professional certificate course covers
- 19:49:28the following topics. IT fundamentals,
- 19:49:30software engineering basics, and the
- 19:49:32basics of the scrum master profession.
- 19:49:34Each topic corresponds to an online
- 19:49:36course you can complete independently.
- 19:49:39Each course consists of three to six
- 19:49:40modules. Completing courses covering the
- 19:49:43concepts and the required projects will
- 19:49:45earn you the IBM project manager
- 19:49:47professional certificate or the IBM IT
- 19:49:50project manager professional
- 19:49:52certificate. As you embark on the
- 19:49:53project manager professional certificate
- 19:49:55journey, get started with the basics of
- 19:49:57project management. Learn about the role
- 19:49:59of a project manager, the required
- 19:50:01skills and responsibilities. Gain
- 19:50:04familiarity with project manager career
- 19:50:06opportunities. Initiation and planning
- 19:50:08are other topics covered as a part of
- 19:50:10this professional certificate. Enhance
- 19:50:12your foundational project management
- 19:50:14knowledge. Learn about setting up a
- 19:50:15project. With planning being a critical
- 19:50:17phase, understand the project planning
- 19:50:20processes, documents, and tips. This
- 19:50:23professional certificate also delves
- 19:50:25into the risk management life cycle from
- 19:50:27planning and identifying risks to
- 19:50:29evaluation. You will also learn
- 19:50:31different strategies to respond to
- 19:50:32risks. You will also learn about the
- 19:50:34tools like the risk reports, risk
- 19:50:36registers and the risk matrix with
- 19:50:38critical project manager skills in
- 19:50:40communication, stakeholder management
- 19:50:42and leadership. You will learn how to
- 19:50:45lead, communicate and manage
- 19:50:46stakeholders. You will learn to
- 19:50:48cultivate a healthy project environment
- 19:50:50and share with team members and
- 19:50:52stakeholders using appropriate
- 19:50:53communication mediums and channels. You
- 19:50:55will explore the leadership skills used
- 19:50:57to improve stakeholder engagement and
- 19:50:59facilitate successful projects from
- 19:51:01start through closing. You will also get
- 19:51:03started with using agile development in
- 19:51:05scrum. You will learn about the agile
- 19:51:07concepts of adaptive planning, iterative
- 19:51:10development and continuous improvement.
- 19:51:12You will discover waterfall extreme
- 19:51:14programming XP methodologies and canban.
- 19:51:17Finally, learn about scrum as a
- 19:51:19framework and its deliverables. This
- 19:51:21program will introduce you to some IT
- 19:51:23fundamentals for the IT project manager
- 19:51:25professional certificate. You will delve
- 19:51:27into hardware, operating systems,
- 19:51:29technology, software, programming,
- 19:51:31databases, networking, storage, cyber
- 19:51:34security, cloud computing, support and
- 19:51:37operations. Another IT project manager
- 19:51:40professional certificate specific topic
- 19:51:42is software engineering. Learn about the
- 19:51:44power of the software development life
- 19:51:45cycle, SDLC, and modern software
- 19:51:48development framework methodologies. You
- 19:51:50will also experience working hands-on
- 19:51:52with different tools and languages such
- 19:51:54as an IDE, the basics of programming in
- 19:51:56Python and Hello World in 10 languages.
- 19:51:59The last unique topic in the IT project
- 19:52:02manager professional certificate is the
- 19:52:04essential aspects of being a scrum
- 19:52:06master. You will learn the practical
- 19:52:07skills required to become a highly
- 19:52:09effective scrum master. In the capstone
- 19:52:11project, you will apply all the skills
- 19:52:13learned in the professional certificate
- 19:52:15course to plan, execute, and close the
- 19:52:17project. The artifacts from this project
- 19:52:19will be an excellent addition to your
- 19:52:21portfolio. It will also take you closer
- 19:52:23to achieving the professional
- 19:52:24certificate. As you review the content,
- 19:52:26the course will present you with quizzes
- 19:52:28and projects to evaluate your learning.
- 19:52:30The graded quizzes carry a weight that
- 19:52:32contributes to the course completion.
- 19:52:34Most projects will be peer- graded and
- 19:52:36carry a weightage contributing to the
- 19:52:38course and professional certificate
- 19:52:40completion requirement. The capstone
- 19:52:41project will provide you with some
- 19:52:43requirements based on which you will
- 19:52:44build an app or website. The project
- 19:52:46will also be a good addition to your
- 19:52:48portfolio to showcase to prospective
- 19:52:50employers. Finally, after completing all
- 19:52:52the content successfully, you will be
- 19:52:54awarded the IBM Project Manager
- 19:52:56Professional Certificate or IBM IT
- 19:52:58Project Manager Professional
- 19:53:00Certificate, a credential many employers
- 19:53:02value. We wish you the very best and
- 19:53:04hope you enjoy this journey.
- 19:53:10[Music]
- 19:53:16Welcome to project management career
- 19:53:18opportunities. After watching this
- 19:53:20video, you'll be able to summarize the
- 19:53:22current job market for project
- 19:53:24management professionals, describe the
- 19:53:26current salary structure for project
- 19:53:28managers, describe job titles and
- 19:53:30related roles in project management.
- 19:53:32According to a PMI pulse report,
- 19:53:35projects are 2.5 times more successful
- 19:53:37when project management practices are
- 19:53:39implemented. That's right. This
- 19:53:41statistic is an indication of why the
- 19:53:43demand for project managers is growing
- 19:53:45faster than the demand for workers in
- 19:53:47other professions. Further, the
- 19:53:50practices of project management are
- 19:53:52expanding within various industries that
- 19:53:54were traditionally less projectoriented
- 19:53:56such as healthcare, publishing, and
- 19:53:59professional services. For example, the
- 19:54:01healthc care sector in the US has seen a
- 19:54:0417% growth for project management roles.
- 19:54:07According to the US Bureau of Labor
- 19:54:09Statistics, employment of project
- 19:54:11management specialists will grow by 6%
- 19:54:13each year through the decade, which
- 19:54:16translates to roughly 68,100 openings
- 19:54:19for project management specialists are
- 19:54:20projected each year on average over the
- 19:54:23decade. Finally, according to the PMI,
- 19:54:27the project management oriented labor
- 19:54:29force and seven projectoriented sectors
- 19:54:31is expected to grow by 33% or nearly 22
- 19:54:35million new jobs over the decade. So,
- 19:54:38there are many opportunities to pursue a
- 19:54:40career in project management and find a
- 19:54:42job opportunity that meets your specific
- 19:54:44needs. Wondering what the salary trends
- 19:54:47for project managers are? Let's review
- 19:54:49some statistics. According to
- 19:54:51indeed.com, the average salary for a
- 19:54:54project manager in the United States is
- 19:54:56$87,716
- 19:54:58per year. The salary varies from $56,462
- 19:55:03to $136,270
- 19:55:06per year with non-cash benefits such as
- 19:55:09401k also included. Salaries are
- 19:55:11variable based on your years of
- 19:55:13experience, certifications,
- 19:55:15demographics, and the type of company
- 19:55:17you work for. According to the US Bureau
- 19:55:19of Labor Statistics, the median salary
- 19:55:22for project management professionals in
- 19:55:24the US is $95,370
- 19:55:27per year, with the bottom 10% earning a
- 19:55:29median of $52,500
- 19:55:32and the top 10% earning $159,150.
- 19:55:36Improving your skills and competencies
- 19:55:38can help you with the potential increase
- 19:55:40in salary. Let's look at the different
- 19:55:42roles and different job titles that
- 19:55:44require project management skills.
- 19:55:46Project manager. This is the most common
- 19:55:49job title. The project manager is
- 19:55:51responsible for initiating, planning,
- 19:55:54executing, monitoring, and controlling
- 19:55:57and closing a project successfully. They
- 19:55:59ensure that the project proceeds within
- 19:56:01the specified time frame and budget
- 19:56:03while achieving its objectives.
- 19:56:05Assistant project manager. The assistant
- 19:56:08project manager works closely with the
- 19:56:10project manager to ensure that tasks are
- 19:56:12completed on time and within budget.
- 19:56:15They also help manage relationships with
- 19:56:17contributors and stakeholders. An
- 19:56:19assistant project manager normally leads
- 19:56:21the effort to complete a critical phase
- 19:56:23of the project as defined in the work
- 19:56:26breakdown structure WBS.
- 19:56:28Project coordinator. The project
- 19:56:31coordinator is responsible for
- 19:56:33coordinating tasks and activities across
- 19:56:35different teams and departments. This is
- 19:56:38an entry-level project management role.
- 19:56:40They ensure that everyone is working
- 19:56:42towards a common goal and ensure project
- 19:56:44communication is effective. A project
- 19:56:47coordinator may also be defined as a
- 19:56:49project expediter. Project team member.
- 19:56:53Project team members are responsible for
- 19:56:55completing tasks assigned to them by the
- 19:56:57project manager. They work
- 19:56:59collaboratively with other team members
- 19:57:00to achieve project goals. Project team
- 19:57:03members are normally responsible for
- 19:57:05individual work packages that support
- 19:57:06the project. This places them in the
- 19:57:09role of a project manager to complete
- 19:57:11the segment of the overall project.
- 19:57:14Project sponsor. The project sponsor is
- 19:57:17responsible for providing financial
- 19:57:19resources, authorizing resources and
- 19:57:21support for the project. They also
- 19:57:24ensure that the project aligns with the
- 19:57:25organization's strategic goals. Many
- 19:57:28sponsors have prior project management
- 19:57:30experience. Regardless, they must
- 19:57:32understand the project management
- 19:57:34function. Executive sponsor. The
- 19:57:37executive sponsor is responsible for
- 19:57:39providing highlevel support for the
- 19:57:41project. They ensure that the project
- 19:57:43aligns with the organization's overall
- 19:57:45strategy and vision. An executive
- 19:57:48sponsor needs a solid understanding of
- 19:57:49both program management and portfolio
- 19:57:52management to be effective.
- 19:57:54Program manager. A program manager
- 19:57:57manages a set of projects that must be
- 19:57:59accomplished successfully to achieve a
- 19:58:01corporate strategic initiative or goal.
- 19:58:04A program manager often manages multiple
- 19:58:06project managers. Portfolio manager. The
- 19:58:10portfolio manager develops benefit
- 19:58:12management plans and business cases and
- 19:58:15determines which programs are required
- 19:58:16to achieve the organization's vision
- 19:58:18successfully. This is a high-level
- 19:58:21project management role.
- 19:58:23Business analyst. The business analyst
- 19:58:26is responsible for analyzing and
- 19:58:28translating business requirements into
- 19:58:30technical requirements. A business
- 19:58:32analyst performs a number of project
- 19:58:34management activities as part of their
- 19:58:35everyday duties. They work closely with
- 19:58:38stakeholders and the project manager to
- 19:58:40ensure that the project meets the
- 19:58:42business needs.
- 19:58:43Product owner. A product owner acts as
- 19:58:46the voice of the customer VOC and
- 19:58:49develops user stories and a prioritized
- 19:58:51product backlog. A product owner
- 19:58:54performs multiple project management
- 19:58:56functions in an agile/scrum environment.
- 19:58:59In this video, you learned that project
- 19:59:02management professionals are in great
- 19:59:04demand and this field is expanding. Pay
- 19:59:07and benefits are well above that of many
- 19:59:09other professions with salaries ranging
- 19:59:11from $52,500
- 19:59:14to $159,150
- 19:59:16per year. The different job titles that
- 19:59:19require project management skills
- 19:59:21include project manager, assistant
- 19:59:24project manager, project coordinator,
- 19:59:26project team member, project sponsor,
- 19:59:29executive sponsor, program manager,
- 19:59:32portfolio manager, business analyst,
- 19:59:35product owner.
- 19:59:41[Music]
- 19:59:47Welcome to expert viewpoints project
- 19:59:49management as a career.
- 19:59:52In this video, experienced industry
- 19:59:54professionals relate how they started as
- 19:59:56a project manager and share their advice
- 19:59:59for starting a project management
- 20:00:01career. as a project manager. Many years
- 20:00:05ago, I had the privilege of serving the
- 20:00:08United States Air Force and while I was
- 20:00:10in the Air Force, I was in computer
- 20:00:12maintenance. To be honest, I was pretty
- 20:00:14excited about that particular job.
- 20:00:17However, the Air Force decided that they
- 20:00:19were going to create a new career field
- 20:00:21called project management, and I was one
- 20:00:24of the first individuals who was
- 20:00:26selected to play a role as a project
- 20:00:28manager. I wasn't too excited about this
- 20:00:31at first to be perfectly honest because
- 20:00:33I really enjoyed computers. However, the
- 20:00:36more I learned about project management,
- 20:00:38the more I realized what an impact maker
- 20:00:40project management is. You truly make a
- 20:00:43difference. You turn great ideas into
- 20:00:45reality. You make things happen.
- 20:00:47>> Uh I had been working in other roles,
- 20:00:49mostly doing frontline work, some
- 20:00:51development, some uh I was I was what
- 20:00:54was called a build master where I was
- 20:00:55building CDs. This is way back in the
- 20:00:581990s. And um I was doing that work uh
- 20:01:01just as a part of my regular job. But I
- 20:01:04I think I have a natural propensity
- 20:01:05towards um project management mainly
- 20:01:08because um I I have a degree in
- 20:01:10philosophy and I have a lot of analytic
- 20:01:12skills and I brought those skills to the
- 20:01:14table as I was doing my regular job and
- 20:01:17um upper management noticed. So as I was
- 20:01:20applying those skills in my job um I
- 20:01:23slowly migrated into managing people and
- 20:01:26the more I got into managing people the
- 20:01:27more I got into managing project.
- 20:01:29>> I didn't see myself originally moving
- 20:01:31towards the direction of a project
- 20:01:33manager. I was in a role where I was
- 20:01:35managing customer support organizations
- 20:01:38and as certain assignments and
- 20:01:40responsibilities came along I kind of
- 20:01:42migrated into a project manager role. I
- 20:01:45mean, things as simple as we had an
- 20:01:46off-site, and so I took responsibility
- 20:01:48of managing the off-site with the with
- 20:01:50the venue and the accommodations and the
- 20:01:52travel plans and and the agenda and and
- 20:01:55that kind of moved me into a project
- 20:01:57manager role before I really knew that I
- 20:01:59I was or or wanted to be a project
- 20:02:01manager. And as time went on, I
- 20:02:03continued to take assignments that were
- 20:02:05in that project manager world, if you
- 20:02:08will.
- 20:02:08>> I don't have uh a background and
- 20:02:11education in project management. my uh
- 20:02:13college degree and my master's degree
- 20:02:15are in psychology and and the
- 20:02:17neuroscience of behavior. And so for a
- 20:02:20long time, I thought I was going to be a
- 20:02:22teacher. And so when that didn't work
- 20:02:25out and I didn't I decided not to pursue
- 20:02:28that, I ended up doing technical support
- 20:02:31uh for Microsoft. And so as I went
- 20:02:33through the process of doing technical
- 20:02:36support, it really refined the ability
- 20:02:38for to communicate about things but then
- 20:02:41also um really refined that
- 20:02:44communication skill. How do I listen to
- 20:02:46somebody, understand what their problem
- 20:02:48is and then try to figure out analyze it
- 20:02:50and try to figure out a solution? And so
- 20:02:52when I left technical support and and
- 20:02:55went forward, I went into training
- 20:02:57because I always did want to still be a
- 20:02:59teacher. I did still want to learn new
- 20:03:01things myself but also uh share that
- 20:03:03with other people. And so I wrote for a
- 20:03:06while and then I did a little bit of
- 20:03:07instructional design. And at that time
- 20:03:11um when I was writing and doing
- 20:03:12instructional design there were changes
- 20:03:14at Microsoft and I had to choose um I
- 20:03:17could either be one or the other. I
- 20:03:19could and I was project managing my own
- 20:03:20projects. And so I had to choose did I
- 20:03:23want to continue writing and and
- 20:03:25designing or did I want to move into
- 20:03:27project management and I opted to move
- 20:03:30into project management and honestly
- 20:03:33best decision ever. Um I realized that I
- 20:03:36am a project manager at heart. I love
- 20:03:39the intricacies of the project. I love
- 20:03:41working to figure out the best way to
- 20:03:43get things done. Oddly I really like
- 20:03:46scheduling which is strange. Um or maybe
- 20:03:49not. I don't know but um it's helped me
- 20:03:51a lot in my career and so from then on I
- 20:03:54stayed uh on the project management
- 20:03:56route and project management for
- 20:03:58content.
- 20:04:02>> What advice can you give someone who
- 20:04:03wants to make project management a
- 20:04:05career?
- 20:04:05>> Well, let me go ahead and give you four
- 20:04:07tidbits of information. First of all,
- 20:04:10try to find positions where you can be a
- 20:04:12project contributor. You may not be
- 20:04:15ready to become a project manager or a
- 20:04:17lead, but a project contributor normally
- 20:04:20is in charge of an activity or a work
- 20:04:22package and you have to learn project
- 20:04:24management skills and you have to use
- 20:04:26those skills to be successful. Secondly,
- 20:04:30try to get some education in project
- 20:04:31management as well. In addition, there
- 20:04:33are many good continuing education
- 20:04:35programs available at universities all
- 20:04:38around the world. Third, consider
- 20:04:41certifications as well. There are a
- 20:04:43couple of good certifications. The CAPM,
- 20:04:46certified associate in project
- 20:04:48management, is highly recommended. If
- 20:04:50you have a lot of experience, you may
- 20:04:52want to try for a project management
- 20:04:54professional. And on the agile side,
- 20:04:56certified scrum master is definitely a
- 20:04:59recommendation. And last, but certainly
- 20:05:01not least, find someone who can help
- 20:05:04coach and mentor you as well. Find a
- 20:05:06project manager who's willing to spend
- 20:05:08some time with you and show you the
- 20:05:10ropes, if you will. start really start
- 20:05:13looking at the PMP and understanding the
- 20:05:17latest one, understanding the principles
- 20:05:20and the role in and of itself and all
- 20:05:24the nuances of the role and the
- 20:05:25different ways that you can go with
- 20:05:27project management. And then also look
- 20:05:29at the sector or the industry that
- 20:05:31you're thinking about working in because
- 20:05:33it project management does truly vary
- 20:05:36depending on um what job you're looking
- 20:05:39at where your where your passion lies.
- 20:05:42>> Taking on those assignments and reaching
- 20:05:43out and volunteering and looking for the
- 20:05:45opportunities to lead initiatives. In
- 20:05:48any business environment, there's always
- 20:05:50going to be those off sites or those
- 20:05:53business meetings or those certain
- 20:05:55events that you can raise your hand and
- 20:05:57and get your foot in the pool, if you
- 20:05:59will, to start moving in that direction.
- 20:06:02Once you are able to manage some of
- 20:06:04those tasks effectively and efficiently
- 20:06:07and keep people on the same page and
- 20:06:10keep people motivated towards the goals
- 20:06:12and timelines, you'll find a lot of
- 20:06:14opportunities will then start opening up
- 20:06:16after you prove yourself with those
- 20:06:18initial opportunities.
- 20:06:24[Music]
- 20:06:30Welcome to a brief overview of how to
- 20:06:32develop a personal work portfolio. A
- 20:06:35personal portfolio is a great way to
- 20:06:37showcase your work and demonstrate you
- 20:06:40have the skills required to satisfy a
- 20:06:42potential job role. This short demo will
- 20:06:45provide an idea of what to include in
- 20:06:48your portfolio and how to format your
- 20:06:50presentation. A portfolio can be a hard
- 20:06:53copy document or an electronic one.
- 20:06:57Share your name, title, and contact
- 20:06:59information. Always include a picture.
- 20:07:03Try to share a variety of pictures
- 20:07:05throughout the portfolio.
- 20:07:07Provide a brief introduction. Tailor
- 20:07:10your introduction so that it resonates
- 20:07:12with the audience you are sharing your
- 20:07:14portfolio with. Provide a brief agenda.
- 20:07:18You may wish to reference the slide or
- 20:07:20page number and turn this into a mini
- 20:07:23table of contents. Again, a picture is
- 20:07:26worth a thousand words and vary your
- 20:07:30pictures. The next section provides a
- 20:07:32miniature persona of yourself. Share
- 20:07:35your goals. If possible, try to share
- 20:07:38goals that the portfolio viewer might
- 20:07:40embrace as well. Express your values.
- 20:07:43Again, do your homework. What values do
- 20:07:46you possess that would be appreciated by
- 20:07:48the reader and the organization you are
- 20:07:51targeting? Share your likes. What drives
- 20:07:54you? What are your passionate about?
- 20:07:56Always ask yourself, how will my likes
- 20:07:59add value to the role I am seeking?
- 20:08:03Consider a quote that expresses your
- 20:08:05passion and values. This is optional.
- 20:08:08However, if you have a favorite quote or
- 20:08:10saying that matches the vision or values
- 20:08:12of the organization or role you are
- 20:08:14targeting, by all means add it. Always
- 20:08:17include an overview of your education
- 20:08:19and certifications.
- 20:08:21You don't need to list everything.
- 20:08:23Determine which educational and
- 20:08:25certification particulars support the
- 20:08:27position you hope to attain. List your
- 20:08:30job history. Share your last three or
- 20:08:33four roles that show you have the
- 20:08:34experience needed to take that next big
- 20:08:37career step. Share pictures of you on
- 20:08:40the job. Try to have a good mix of you
- 20:08:43working by yourself and with others.
- 20:08:46Choose pictures that show your passion,
- 20:08:48ability to effectively collaborate, and
- 20:08:50your professionalism on the job. Again,
- 20:08:54do your homework. Try to choose examples
- 20:08:56of your work that are meaningful to the
- 20:08:59portfolio reader and pertinent to the
- 20:09:01role you hope to attain. Try to limit
- 20:09:04this part of your portfolio to your
- 20:09:06hardesthitting top three examples.
- 20:09:09Describe the work. Share how this work
- 20:09:12provided positive results. Finally,
- 20:09:15share a link to the work. Give the
- 20:09:17reader an opportunity to view the work
- 20:09:19in detail. Here is a slide for your best
- 20:09:24work number two. And here is yet another
- 20:09:27slide for your best work number three.
- 20:09:31Share references. Find individuals who
- 20:09:33work in meaningful positions willing to
- 20:09:35be advocates for you. If possible,
- 20:09:38pictures add impact. You may wish to add
- 20:09:42contact information to the references as
- 20:09:45well. Last but not least, provide a
- 20:09:47brief summary. Reiterate who you are,
- 20:09:51what you stand for, and the value you
- 20:09:53can bring to an organization. This is
- 20:09:56your final elevator pitch. Tailor this
- 20:09:59section to the audience. Always end with
- 20:10:02a thank you to those who took the time
- 20:10:05to review your portfolio.
- 20:10:07Reiterate your contact information and
- 20:10:10of course your smile.
- 20:10:16[Music]
- 20:10:18[Applause]
- 20:10:19[Music]
- 20:10:23Welcome to expert viewpoints personal
- 20:10:25portfolios. In this video, delve into
- 20:10:28the advantages of creating a portfolio
- 20:10:30and get advice about making your
- 20:10:32portfolio stand out.
- 20:10:34>> You know, your profile and your
- 20:10:37portfolio and then that's going to be a
- 20:10:39lot more sellable to a a role that's
- 20:10:41looking for a project manager. So I
- 20:10:43would say the first step is to do a self
- 20:10:45assessment. The second step is to um you
- 20:10:48know fill in the gaps that you have and
- 20:10:50then once you have that well-rounded uh
- 20:10:52skill set then you can look really look
- 20:10:54for applying to formal roles. A personal
- 20:10:57portfolio can really give uh a recruiter
- 20:11:00or a hiring manager a sense of what
- 20:11:03you've done and how you've applied
- 20:11:06project management skills to the the
- 20:11:08role that they're looking to fill. And
- 20:11:10of course, your resume is incredibly
- 20:11:12important, but it can only communicate
- 20:11:14so much. When you start talking about a
- 20:11:17portfolio that you're going to create,
- 20:11:19that brings into play media and
- 20:11:22photographs and examples of your work
- 20:11:24history. That can be really, really
- 20:11:25powerful um beyond just a written
- 20:11:27resume.
- 20:11:28>> Primary advantages of creating a
- 20:11:31personal portfolio. one, you really as
- 20:11:34you reflect to do that, you're going to
- 20:11:36identify some strengths that you never
- 20:11:38knew and probably some weaknesses that
- 20:11:41you either know about, didn't know, or
- 20:11:43are in denial about. But creating a
- 20:11:45personal profile really enables you to
- 20:11:47examine your experience, what you've
- 20:11:50done, and also start thinking about
- 20:11:52where you want to take that profile and
- 20:11:54then tailoring it towards that goal. And
- 20:11:57so really bringing up the things that
- 20:11:59would apply specifically to the goal if
- 20:12:01it's a short-term goal and then longer
- 20:12:04term looking at areas that you maybe
- 20:12:06need to improve on or you maybe need to
- 20:12:08build up your skill set and then seeking
- 20:12:10out opportunities to give you that
- 20:12:12experience or to give you that hands-on
- 20:12:15application of the principle or of the
- 20:12:17skill that you're looking to develop. To
- 20:12:20me, a portfolio is more than just a
- 20:12:22resume. It's more than a reflection of
- 20:12:26what you're trying to sell to your
- 20:12:28potential employer. It's a
- 20:12:30representation of who you are as well
- 20:12:32and what you're going to bring into that
- 20:12:34role. So, some advantages of creating a
- 20:12:38personal portfolio is that it gives you
- 20:12:41an opportunity to showcase your skills
- 20:12:43and projects that you worked on to
- 20:12:45potential employers and demonstrates the
- 20:12:48capabilities that you have. So going
- 20:12:51into an interview type situation or
- 20:12:55having conversations with people about
- 20:12:56your experience, having a portfolio
- 20:12:59allows you to really quickly and easily
- 20:13:02provide proof of the things that you've
- 20:13:04done to showcase the things that you can
- 20:13:07do in project management. and portfolios
- 20:13:12in terms of like interviewing
- 20:13:14occasionally help differentiate you from
- 20:13:16other like interviewees that are going
- 20:13:19through the process and other people who
- 20:13:21are vying for the same role. So you
- 20:13:24might highlight specific projects that
- 20:13:26you've worked on that are very similar
- 20:13:28to projects that you might be working on
- 20:13:30in the role that you're interviewing
- 20:13:32for.
- 20:13:34>> What are a few ways to make your
- 20:13:36personal portfolio stand out? Well,
- 20:13:38first and foremost, take an organized
- 20:13:40approach. In this particular course, you
- 20:13:43will have an opportunity to have a
- 20:13:45hands-on lab where we give you
- 20:13:47instruction on how to develop a pretty
- 20:13:49good personal portfolio. Follow that
- 20:13:52process. It's proven and it works.
- 20:13:55Secondly, make sure that you find a good
- 20:13:58photographer. In your personal
- 20:14:00portfolio, you really want to be able to
- 20:14:02show a professional head shot. And along
- 20:14:06with that professional headsh shot,
- 20:14:07remember show a smile. Choose skills and
- 20:14:11achievements that match the job that you
- 20:14:14are applying for. A prospective employer
- 20:14:17normally is looking to match your skills
- 20:14:19to the skills that are required for the
- 20:14:22position and anything else may become a
- 20:14:24noise factor or extraneous. And last,
- 20:14:27but certainly not least, don't go into
- 20:14:30too much detail. Keep it short and
- 20:14:32sweet. A good personal portfolio follows
- 20:14:34the ABC method. It is accurate, it is
- 20:14:37brief, and it is concise.
- 20:14:40>> So, highlight your most important and
- 20:14:42impactful work first. Make sure that
- 20:14:44that's top and front and center, if you
- 20:14:46will. And also, with that in mind, try
- 20:14:50to keep it as simple as you can. If you
- 20:14:52put a ton of effort into creating a huge
- 20:14:55portfolio, you'll have to just kind of
- 20:14:57accept the fact that most of it won't be
- 20:14:58seen. So knowing your audience, keeping
- 20:15:01it simple and impactful would be some of
- 20:15:03the best advice that I could give.
- 20:15:05>> When creating a personal uh portfolio
- 20:15:08for a project management role, you can
- 20:15:11really stand out by calling out the
- 20:15:13areas um and the projects that you
- 20:15:15worked on where you brought a lot of
- 20:15:17passion to that project and were able to
- 20:15:19apply your your skills as a project
- 20:15:21manager to that project. When I was a
- 20:15:24hiring manager, when I did a lot of
- 20:15:26hiring, I would look for people that
- 20:15:29were really, really into the work that
- 20:15:30they were doing by calling out unique
- 20:15:32things that I didn't see in other
- 20:15:34resumes or other uh portfolios. And that
- 20:15:38passion really comes through. Um, I use
- 20:15:40an example of a of a personal move once
- 20:15:42that I I did a move cross country and I
- 20:15:46tried to describe that in a way that um
- 20:15:48brought some of the excitement of that
- 20:15:50of that project uh into the portfolio
- 20:15:54and um made sure that I was
- 20:15:56communicating that that as a project was
- 20:15:58really important to me.
- 20:16:01I would really include lots of detail
- 20:16:04about the projects that you've worked on
- 20:16:06and think about those uh projects and
- 20:16:09the way you describe them as kind of
- 20:16:11like a case study. So what was the
- 20:16:14problem or what was the uh you know the
- 20:16:18ask of you from the beginning? What were
- 20:16:21the things that you did throughout the
- 20:16:22life cycle of the project to
- 20:16:24successfully manage that project? And
- 20:16:26then what was the outcome of that
- 20:16:28project? Was it on time? Was it on
- 20:16:31budget? Was it really high quality? And
- 20:16:33with that, you can add testimonials from
- 20:16:37managers, people on the project team
- 20:16:39that you worked with, vendors that you
- 20:16:41might have worked with, and even your
- 20:16:44supervisors of those projects. And then
- 20:16:47finally, uh use your portfolio to really
- 20:16:50display a range of skills. So, um you if
- 20:16:56you're in charge of budgets for a few
- 20:16:59projects, uh don't put all of those
- 20:17:01projects in your portfolio if if you're
- 20:17:04only been responsible for one thing. Try
- 20:17:07to find different parts of the project
- 20:17:10that you are responsible for that can
- 20:17:12really differentiate the different types
- 20:17:14of skills and experiences that you have
- 20:17:17so that you look like uh you have a wide
- 20:17:21range of capabilities and skills.
- 20:17:24[Music]
- 20:17:35Welcome to creating profiles for online
- 20:17:37sites. After watching this video, you'll
- 20:17:39be able to describe online sites for
- 20:17:42professionals to build a network, share
- 20:17:44and learn, discuss best practices for
- 20:17:47creating a professional and effective
- 20:17:48profile on an online site. In the
- 20:17:51digital age where almost all
- 20:17:52interactions and transactions are
- 20:17:54online, a digital profile is a
- 20:17:56necessity. You can use several
- 20:17:58professional online sites to create your
- 20:18:00digital profile and share information,
- 20:18:02experience, and professional
- 20:18:04achievements. Using the online sites,
- 20:18:06you can even network with other
- 20:18:08professionals and potentially impress a
- 20:18:10prospective employer. Let's look at a
- 20:18:12few popular sites. LinkedIn is arguably
- 20:18:14one of the most popular professional
- 20:18:16sites with a presence in over 200
- 20:18:18countries and more than 930 million
- 20:18:21subscribers or monthly active users.
- 20:18:23Zing is another professional networking
- 20:18:25site that is similar to LinkedIn. It
- 20:18:27offers features such as groups, news,
- 20:18:29and events. Zing is primarily focused on
- 20:18:32the Germanspeaking and European
- 20:18:33community. Zing has more than 16 million
- 20:18:36members. Angel List is the world's
- 20:18:38largest startup community and has
- 20:18:40investment, job, and information
- 20:18:42opportunities. This site features
- 20:18:44fundraising options and connects
- 20:18:46startups with angel investors. Angelist
- 20:18:48has more than 2 million users. Jobcase
- 20:18:51is another networking platform that
- 20:18:53connects job seekers with employers. Job
- 20:18:55Case currently has more than 130 million
- 20:18:57subscribers. Other online sites include
- 20:19:00About Me, which is a free platform that
- 20:19:02allows you to create a personal website,
- 20:19:04and Glass Door is a job search site that
- 20:19:06provides company reviews and salary
- 20:19:08information. While creating a profile on
- 20:19:10a professional site is important, it is
- 20:19:12critical that the profile has a positive
- 20:19:14impact. Let's review some key best
- 20:19:16practices to improve the level of impact
- 20:19:18of your profile on a professional site.
- 20:19:20Include an up-to-date headshot. A
- 20:19:22professional headshot increases the
- 20:19:23credibility of your profile and allows
- 20:19:25for a positive first impression.
- 20:19:27Consider a professional photographer.
- 20:19:29Write a compelling summary statement.
- 20:19:31The summary section is an opportunity to
- 20:19:34showcase your skills, experience, and
- 20:19:36personality. It should be concise,
- 20:19:38engaging, and well written. In addition,
- 20:19:41track the jobs you're seeking and
- 20:19:43updated frequently. It should be
- 20:19:44current. Optimize your headline and
- 20:19:46summary with relevant keywords. Use
- 20:19:49relevant keywords in your headline and
- 20:19:51summary to make your profile more
- 20:19:52discoverable. Try to use keywords that
- 20:19:54match the job requirements you are
- 20:19:56seeking. List your work history. Your
- 20:19:58work history should include at least two
- 20:20:00or three of your past positions. Try to
- 20:20:03match your job experience with the
- 20:20:04position that you're currently
- 20:20:05considering. Your past experience
- 20:20:07section should briefly describe your
- 20:20:09role and key accomplishments. Be sure to
- 20:20:11add keywords in the title and
- 20:20:13description to match the job you're
- 20:20:14pursuing. List your skills and
- 20:20:16accomplishments. Highlight your skills
- 20:20:18and accomplishments. Highlight specific
- 20:20:20skills and accomplishments you possess
- 20:20:22that translate well to the position you
- 20:20:24are seeking. This will help recruiters
- 20:20:26and other members understand the skill
- 20:20:27sets you possess. Try to solicit
- 20:20:30recommendations from others that attest
- 20:20:32to your excellence in the select skill
- 20:20:33sets. Share awards or recognition.
- 20:20:36Include awards and recognition to help
- 20:20:38you stand out and showcase your
- 20:20:40achievements. Try to confine this to
- 20:20:41professional achievement awards. Rewards
- 20:20:44for sharing your charitable activities
- 20:20:45are a plus. Share your education.
- 20:20:48Include your educational background. Be
- 20:20:50selective. Only include relevant degrees
- 20:20:52and certifications. Create a personal
- 20:20:55profile URL. Use the URL to share your
- 20:20:58portfolio and other examples of your
- 20:21:00work. Seek connections. Connect with
- 20:21:02people in your industry and other
- 20:21:04professionals to expand your network.
- 20:21:06Develop positive relationships.
- 20:21:08Connections matter. Ask for skill
- 20:21:10endorsements and recommendations. Skill
- 20:21:12endorsements and recommendations can
- 20:21:14help you build credibility and showcase
- 20:21:16your expertise. Be willing to share
- 20:21:18recommendations and endorsements for
- 20:21:20others. In many cases, those you
- 20:21:22recommend will reciprocate. Stay active.
- 20:21:25Stay active by posting updates,
- 20:21:27commenting on other people's posts, and
- 20:21:29engaging with your network. Avoid
- 20:21:31politics and religion. Try to avoid
- 20:21:33political or religious oriented posts.
- 20:21:35There may be some who do not share your
- 20:21:37political or religious views. Avoid
- 20:21:39alienating those in your network. Try to
- 20:21:41keep your comments professional. In
- 20:21:43addition, avoid commenting on political
- 20:21:45or religiousoriented posts from others.
- 20:21:48In this video, you learned that some of
- 20:21:50the popular online professional sites
- 20:21:52include LinkedIn, Zing, Angel List,
- 20:21:56Jobcase, About Me, Glass Door. Some key
- 20:21:59best practices when creating a profile
- 20:22:01include include an up-to-date headshot,
- 20:22:04write a compelling summary statement,
- 20:22:06list your work history, list your skills
- 20:22:08and accomplishments, share awards or
- 20:22:10recognition, share your education,
- 20:22:12create a personal profile URL, seek
- 20:22:14connections, ask for skill endorsements
- 20:22:16and recommendations. Stay active. Avoid
- 20:22:19politics and religion.
- 20:22:24Consider
- 20:22:27[Music]
- 20:22:32this scenario. You hop into an elevator
- 20:22:34and see a CEO of an organization you
- 20:22:37always wanted to be a part of. You want
- 20:22:39to introduce yourself and make a good
- 20:22:40first impression. You have about 30
- 20:22:43seconds. How do you accomplish this
- 20:22:44task? This is where a well-prepared
- 20:22:47elevator pitch can help. Welcome to
- 20:22:50drafting the elevator pitch.
- 20:22:52After watching this video, you'll be
- 20:22:54able to summarize the purpose of an
- 20:22:57elevator pitch, explain the content of
- 20:22:59an elevator pitch, illustrate an example
- 20:23:02of an elevator pitch. An elevator pitch
- 20:23:05is a short, easily memorized statement
- 20:23:07that describes you, your key features as
- 20:23:09a job seeker, and your career goals. You
- 20:23:12can use it in spoken or written context
- 20:23:14to help introduce yourself effectively.
- 20:23:17You can even use an elevator pitch as an
- 20:23:19effective resume building and employment
- 20:23:21seeking tool. For example, the elevator
- 20:23:24pitch can be a part of the cover letter
- 20:23:26or be used when speaking with a
- 20:23:27potential hirer. Also, if an interviewer
- 20:23:31says, "Tell us something about
- 20:23:32yourself." A prepared elevator pitch can
- 20:23:34help you answer with poise.
- 20:23:37Your elevator pitch should answer three
- 20:23:38questions. Who are you? What do you do?
- 20:23:42And what do you want? Let's look at how
- 20:23:44to respond to each of these questions in
- 20:23:46detail to help you write an elevator
- 20:23:48pitch of your own. Let's start with how
- 20:23:51to frame a response to the question,
- 20:23:53"Who are you?" Start by introducing
- 20:23:56yourself with your full name. Add your
- 20:23:58preferred name in if you have one. If
- 20:24:00you're in a face-to-face situation, this
- 20:24:02is a good time to offer a handshake or
- 20:24:05appropriate greeting based on cultural
- 20:24:06norms. Follow this with a statement
- 20:24:09about your career title and current
- 20:24:10situation. For example, hi, I'm Jonathan
- 20:24:14Mason. I'm an IT data manager working
- 20:24:17toward a move into project management.
- 20:24:20Next, focus on framing a response to the
- 20:24:23question, "What do you do?" Identify a
- 20:24:26few key skills or experiences that set
- 20:24:28you apart and make you an interesting
- 20:24:30candidate. Don't try to list your whole
- 20:24:33resume. Instead, pick a highlight or two
- 20:24:36about your recent experience. When
- 20:24:38you've decided on your points, arrange
- 20:24:40them in a way that makes sense. You want
- 20:24:42to tell a story, not just list bullet
- 20:24:44points. Making a story from your points
- 20:24:46quickly engages your readers or
- 20:24:48listeners interest. For example, I've
- 20:24:51spent the last 6 years as a data analyst
- 20:24:53for a cloud development company where
- 20:24:55I've developed my skills in programming
- 20:24:57and served as a team leader. While
- 20:25:00leading several successful project
- 20:25:01teams, I became interested in IT project
- 20:25:04management and have gone back to school
- 20:25:06to earn a business administration
- 20:25:07degree. Finally, think and write your
- 20:25:10response to the question, "What do you
- 20:25:12want?"
- 20:25:14Finish with an action request. The
- 20:25:16response to the question may be a
- 20:25:18request for an interview or a specific
- 20:25:20role. It might even be a way to ask
- 20:25:22whether your goal matches the position
- 20:25:24the firm needs to fill. The idea is to
- 20:25:26encourage others to engage with you, not
- 20:25:29just listen to what you've said. This
- 20:25:31will definitely depend on the context
- 20:25:32and setting. So, think of a few possible
- 20:25:35endings. For example, while I'm working
- 20:25:38on the degree, I'm looking for a
- 20:25:40position in project management so I can
- 20:25:42put my learning to use. I'm interested
- 20:25:44in the work your company does, and I
- 20:25:46think I can bring a lot of expertise and
- 20:25:48leadership to your organization. Could
- 20:25:50we meet to discuss the open project
- 20:25:51manager roles you currently have?
- 20:25:54Here is how the example elevator pitch
- 20:25:56will read with the three questions
- 20:25:58answered. Hi, I'm Jonathan Mason. I'm an
- 20:26:02IT data manager working towards a move
- 20:26:04in project management. I've spent the
- 20:26:07last 6 years as a data analyst for a
- 20:26:09cloud development company where I've
- 20:26:11developed my skills in programming and
- 20:26:13served as a team leader. While leading
- 20:26:15several successful project teams, I
- 20:26:18became interested in IT project
- 20:26:20management and have gone back to school
- 20:26:21to earn a business administration
- 20:26:23degree. While I'm working on that, I'm
- 20:26:25looking for a project management
- 20:26:26position to put my learning to use. I'm
- 20:26:29very interested in the work your company
- 20:26:30does, and I think I could bring a lot of
- 20:26:32expertise and leadership to your
- 20:26:34organization. Could we meet to discuss
- 20:26:36the open project manager roles you
- 20:26:38currently have?
- 20:26:40When composing your elevator pitch, use
- 20:26:42natural sounding language and avoid
- 20:26:44jargon.
- 20:26:45You should sound comfortable when you
- 20:26:46speak it. So remain professional but use
- 20:26:49your own phrasing. Additionally, your
- 20:26:51pitch should be easily understood by
- 20:26:52many people. This will make it useful in
- 20:26:55many situations.
- 20:26:57After you write your pitch, work to
- 20:26:59memorize it. Practice your pitch until
- 20:27:01you're comfortable and can easily
- 20:27:03deliver it verbally. Slow down and speak
- 20:27:05clearly. Being nervous will likely make
- 20:27:08you speak more quickly, so practice
- 20:27:09slowing down and annunciating. Find a
- 20:27:12friend who will help you memorize it and
- 20:27:14practice speaking it. Maybe you can work
- 20:27:16together on developing elevator pitches
- 20:27:18for both of you. You'll want to be able
- 20:27:21to use this pitch in many situations,
- 20:27:23but sometimes it will make sense to
- 20:27:25tailor it to the context you're in, such
- 20:27:28as changing what you request or
- 20:27:30highlighting a slightly different
- 20:27:31experience. Write the pitch so that it's
- 20:27:34broadly useful, but be ready to tailor
- 20:27:36it as needed.
- 20:27:37In this video, you learned that an
- 20:27:40elevator pitch is a short, easily
- 20:27:42memorized statement that describes you,
- 20:27:44your key features as a job seeker, and
- 20:27:47your career goals. Your elevator pitch
- 20:27:49should answer three questions. Who are
- 20:27:51you? Introduce yourself. What do you do?
- 20:27:55Talk about what your skills and
- 20:27:56competencies are along with your
- 20:27:58experience. What do you want? Put forth
- 20:28:01your request for an interview, job role,
- 20:28:04or a statement that helps clarify the
- 20:28:06available roles in the organization.
- 20:28:08[Music]
- 20:28:19Welcome to Expert Viewpoints Elevator
- 20:28:22Pitch. In this video, experienced
- 20:28:24industry professionals explain how you
- 20:28:26can use an elevator pitch to your
- 20:28:28advantage and share tips for improving
- 20:28:30your elevator pitch.
- 20:28:33So, advantage number one is an elevator
- 20:28:36pitch allows you to go ahead and
- 20:28:38organize your thoughts so that you can
- 20:28:41present yourself in a ABC accurate,
- 20:28:44brief and concise way. It also ensures
- 20:28:48that you are providing the information
- 20:28:51that the other party needs as well
- 20:28:54because when you are going for an
- 20:28:56interview, the potential employer wants
- 20:28:58to know who are you, what skills do you
- 20:29:02have, and what is your purpose for being
- 20:29:04here. I think an elevator pitch is a a
- 20:29:07really good way to internalize um mainly
- 20:29:10for yourself what you're good at, what
- 20:29:12your skills are, and what value you
- 20:29:15bring to a specific role or project. So,
- 20:29:19I use an elevator pitch a lot of times
- 20:29:21with myself to see if I can articulate
- 20:29:23my skills and my value to a specific
- 20:29:26project or role um in in 30 seconds or
- 20:29:30less. So, I will in my head or on paper
- 20:29:32try to write out something that does
- 20:29:34that summary. I would really focus on,
- 20:29:37you know, pitching yourself and getting
- 20:29:39yourself really comfortable with um your
- 20:29:41your skill set and your value in a few
- 20:29:43words. And once you're comfortable with
- 20:29:45that, then you're going to be much
- 20:29:47better and more effective in making that
- 20:29:49pitch to other people.
- 20:29:51Your elevator pitch is really just a 30-
- 20:29:53secondond um communication of who you
- 20:29:56are and what you do and why somebody
- 20:29:58should really consider you or think
- 20:30:00about you perhaps in their business.
- 20:30:02It's focused on an elevator ride that
- 20:30:05lasts about those 30 seconds. And so how
- 20:30:07much can you actually say in 30 seconds?
- 20:30:09So don't overthink it. Keep it very
- 20:30:11simple. Um for example, my name is Ben
- 20:30:14Flower. I'm the director of human skills
- 20:30:16at SkillUp online and my role has been
- 20:30:19to create soft skills or human skills
- 20:30:22courses to complement all the technical
- 20:30:24courses that we offer. And in the last
- 20:30:26year, I've been able to create and
- 20:30:27publish 20 of those courses. Keep it
- 20:30:30simple, keep it succinct, and um just be
- 20:30:33prepared, be be ready to go when those
- 20:30:35opportunities arise.
- 20:30:37So, taking the time to really think
- 20:30:39about the 30 to 45 second version of
- 20:30:43yourself that you would like to present
- 20:30:45to the world is a really great way for
- 20:30:49you to not only distill all of your
- 20:30:52experience, a lot of your skills, the
- 20:30:54things that you're capable of into uh
- 20:30:57something very short and concise. But
- 20:30:59it's a really great way when you have
- 20:31:01very little time meeting someone for the
- 20:31:04first time to really make that great
- 20:31:06first impression and introduce not just
- 20:31:09yourself but also your professional
- 20:31:12background in a way that really
- 20:31:14highlights some of the really amazing
- 20:31:17things about you.
- 20:31:21>> What tips can you provide to improve an
- 20:31:23elevator pitch?
- 20:31:25Well, first and foremost, remember you
- 20:31:26are interviewing for a specific
- 20:31:28position. Try to tailor your elevator
- 20:31:31pitch to that particular position.
- 20:31:34Secondly, practice makes perfect. An
- 20:31:37elevator pitch is something that you
- 20:31:39should have memorized and you really
- 20:31:40shouldn't need to read it. Develop a
- 20:31:44great elevator pitch.
- 20:31:46Share this pitch with friends or
- 20:31:48associates. get their feedback and then
- 20:31:51practice it perhaps in front of the
- 20:31:53mirror or maybe even using your wireless
- 20:31:56device. Go ahead and take a video of
- 20:31:59yourself and review that video and keep
- 20:32:01practicing until you are natural,
- 20:32:04fluent, and you can complete your
- 20:32:06elevator pitch. And again, it's only 30
- 20:32:08seconds or less within a very short
- 20:32:10period without having to read it.
- 20:32:13Practice it um and have it memorize it.
- 20:32:17literally memorize it and then work
- 20:32:19through different iterations of it. You
- 20:32:21don't want it to be wrote and so
- 20:32:23rehearsed that it sounds fake or it
- 20:32:25sounds like you're reading from script.
- 20:32:27Um, but you also want to have it
- 20:32:29available to you just at the snap of a
- 20:32:32finger when you need it. Make sure you
- 20:32:34got a couple different variations.
- 20:32:36you're very comfortable with the three
- 20:32:38things that you want to get across and
- 20:32:41then practice it and then start trying
- 20:32:43to recognize the opportunities for when
- 20:32:45you can try it out with people that you
- 20:32:47don't know. One of the things that I
- 20:32:49mentioned about the resume and the
- 20:32:50portfolio about knowing your audience
- 20:32:52and and changing that to your target
- 20:32:54audience, you might want to have a
- 20:32:56couple different elevator pitches ready
- 20:32:58to go because when you step into that
- 20:32:59elevator, it might be with the CEO of
- 20:33:01your company, it might be with a leader
- 20:33:04of another company, it might be with a
- 20:33:06peer, and the actual message that you
- 20:33:08share will change a little bit depending
- 20:33:09on who that audience is. So, be
- 20:33:12prepared, be flexible with what you're
- 20:33:13going to say in that 30 seconds. you
- 20:33:15still want to highlight your
- 20:33:17contribution and what you actually can
- 20:33:20offer um from that standpoint of what
- 20:33:23whatever might be whether it's a project
- 20:33:25manager or or a team leader. Um but be
- 20:33:27ready to go with a couple different
- 20:33:29elevator pitches and be flexible with
- 20:33:30it.
- 20:33:31>> I would get your pitch down to where
- 20:33:34you're comfortable with it and then
- 20:33:36deliver it to friends, loved ones, other
- 20:33:38colleagues that know you really well. Um
- 20:33:41and see how that pitch lands with them.
- 20:33:43Um, many times when you're delivering
- 20:33:45your elevator pitch, you're going to get
- 20:33:47feedback that you've missed something
- 20:33:48critical, a skill set that you bring to
- 20:33:50the table or something you do really
- 20:33:52well or you may be overemphasizing
- 20:33:54certain things that may be better to
- 20:33:56minimize. Um, and feedback will help you
- 20:33:59do that. So, you'll do a draft of your
- 20:34:01elevator pitch. You'll practice it. Um,
- 20:34:04you'll write it out. And then the more
- 20:34:07you can deliver it to other people and
- 20:34:08get feedback, the better your elevator
- 20:34:10pitch is going to be. Once you get your
- 20:34:13elevator pitch down, you'll kind of
- 20:34:14memorize it. It'll become a part of your
- 20:34:16DNA and as you talk to people about your
- 20:34:19value, you'll be able to deliver that uh
- 20:34:21that elevator pitch in a very concise
- 20:34:24and quick way.
- 20:34:26>> So to improve an elevator speech, I
- 20:34:29would say the first thing is really to
- 20:34:32think about crafting that speech in a
- 20:34:35way that is brief and engaging. So, an
- 20:34:38elevator speech should really be between
- 20:34:4030 seconds and 1 minute. And again, it
- 20:34:44should really highlight the things that
- 20:34:46you're most proud of and the skills that
- 20:34:48you really um you're really great at and
- 20:34:53that you want to highlight to your
- 20:34:54audience. So focus in on really some
- 20:34:58like key accomplishments that you have
- 20:35:00or key skills that you have and really
- 20:35:04take time to craft that so that it's
- 20:35:07very short but also very engaging.
- 20:35:10Tailor it to your audience. So depending
- 20:35:13on who you're talking to, kind of have a
- 20:35:16little um a little bullet list in your
- 20:35:20head of different examples or different
- 20:35:23projects or different skills that you
- 20:35:25can really highlight depending on who
- 20:35:27you're talking to. And tailoring it to
- 20:35:29your audience just really helps the
- 20:35:31person that you're giving your elevator
- 20:35:34speech to feel it makes it feel a little
- 20:35:37bit more personal for them and doesn't
- 20:35:39sound so rehearsed.
- 20:35:45[Music]
- 20:35:51Welcome to conducting company and
- 20:35:54industry research. After watching this
- 20:35:56video, you'll be able to explain how to
- 20:35:59research a company where you want to
- 20:36:00interview for a job, identify good
- 20:36:03sources for company and industry
- 20:36:04research, discuss how to conduct
- 20:36:06anformational interview.
- 20:36:09You might want to research the company
- 20:36:10before applying for a job or preparing
- 20:36:13for an interview. For example, can help
- 20:36:15you understand if the job is right for
- 20:36:17you and if the company is right for you.
- 20:36:20It can also help you determine if the
- 20:36:21values, pay scales, perks, benefits, and
- 20:36:25so on map with your expectations.
- 20:36:28Research before applying can also help
- 20:36:30you tailor your application accordingly.
- 20:36:33Similarly, when you prepare for an
- 20:36:35interview, researching information with
- 20:36:37a focus on the company's values, goals,
- 20:36:39and their expectations of a job will
- 20:36:42help you answer the questions such as,
- 20:36:44"Why are you applying for this
- 20:36:45position?" or "What makes you a good fit
- 20:36:47for the role?" You might also want to
- 20:36:50look up the interviewer's details on
- 20:36:51LinkedIn. The research will make you
- 20:36:54stand out and give you a better chance
- 20:36:55of success.
- 20:36:57So, where will you start your research?
- 20:37:00The company's website is a good starting
- 20:37:02point with its rich source of
- 20:37:03information. Let's look at what can be
- 20:37:06particularly helpful on the website. The
- 20:37:09about section provides details about the
- 20:37:11company's origins and history. You may
- 20:37:14also find information about the
- 20:37:15company's mission and vision as well as
- 20:37:17its goals and culture. Understanding the
- 20:37:20vision and mission statements can help
- 20:37:22you position yourself better for the
- 20:37:24job.
- 20:37:25Looking at the other job postings in the
- 20:37:27career section can help you see the
- 20:37:30company's priorities and expansion
- 20:37:31plans. Further, when reading through the
- 20:37:34website, observe the choice of words and
- 20:37:36any repeating words. A company's word
- 20:37:39choice to describe what it does or what
- 20:37:41it represents can help you understand
- 20:37:43the image the company strives to
- 20:37:44maintain. Incorporating similar language
- 20:37:47and using any key words during your
- 20:37:49interview can help show that you are
- 20:37:51aligned with the company.
- 20:37:53While the company's website is the most
- 20:37:55readily available source, let's review
- 20:37:57other sources that provide good
- 20:37:59information about the company. LinkedIn
- 20:38:01is a tool that you can use to follow the
- 20:38:03companies that you are interested in
- 20:38:04along with the people who work there.
- 20:38:06You also get exposure to hiring managers
- 20:38:09and recruiters in the company. And if
- 20:38:11you know your interviewer's name, you
- 20:38:13can look at their profile to learn about
- 20:38:14their professional background.
- 20:38:17Your local Chamber of Commerce or the
- 20:38:19Better Business Bureau website might be
- 20:38:21a good source of information. You can
- 20:38:23get the organization's size, office
- 20:38:25hours, address, and review ratings.
- 20:38:28Almost all companies these days have a
- 20:38:30social media presence. Through the
- 20:38:33company's social media websites, you can
- 20:38:35keep updated with the current news about
- 20:38:37the company, its accomplishments, and
- 20:38:39its culture.
- 20:38:41Looking up news articles, white papers,
- 20:38:44and publications from the company can
- 20:38:46also provide insights into the company's
- 20:38:47current projects.
- 20:38:49Websites like glass door allow employees
- 20:38:52and customers to post reviews about a
- 20:38:54company. You can read recent posts to
- 20:38:56learn about people's experiences with
- 20:38:58the company. Another good source of
- 20:39:01information is informal conversations
- 20:39:03with people who can provide insights on
- 20:39:05the company, the industry, and the field
- 20:39:07of your interest. Talk to them and get
- 20:39:10some advice on the company, the
- 20:39:11industry, and even your career path. If
- 20:39:14you're wondering where you can find
- 20:39:16someone who can provide you with expert
- 20:39:17advice, here are some recommended steps.
- 20:39:20Make a list of three to five companies
- 20:39:22you would like to learn more about,
- 20:39:24preferably within your area. Use your
- 20:39:27professional network or social media to
- 20:39:29identify professionals who work as
- 20:39:31project managers or in the project
- 20:39:33management domain in the company. You
- 20:39:35can even contact your university
- 20:39:37professor, teacher, or friend for
- 20:39:39reference. Prepare a brief introduction
- 20:39:42and the purpose of your request to meet
- 20:39:44the person and reach out by email,
- 20:39:46phone, LinkedIn, or another platform.
- 20:39:49Prepare your list of questions. There
- 20:39:51are a lot of questions you could ask
- 20:39:53during your interview. Here are some
- 20:39:54ideas. Ask questions about the
- 20:39:57interview's history, such as, "How did
- 20:39:59you become interested in your current
- 20:40:01field? How did you prepare to enter the
- 20:40:03field? And how did you begin your
- 20:40:06career?" Ask about the interview's
- 20:40:09current role. What is the typical
- 20:40:11workday like for you? What do you like
- 20:40:13most about your job? What is one of your
- 20:40:16favorite projects that you have worked
- 20:40:17on? What is the most difficult challenge
- 20:40:20you have dealt with? And what would you
- 20:40:22like to accomplish next in your career?
- 20:40:25Ask for career advice you can use. What
- 20:40:27related fields or career paths would you
- 20:40:29recommend I look into? How do you stay
- 20:40:32current and keep up with changes? What
- 20:40:34current issues in the field should I be
- 20:40:36aware of? and what are the most
- 20:40:39effective strategies for seeking a
- 20:40:40position in this field?
- 20:40:42When you meet the expert or someone from
- 20:40:44the industry, company, or field of
- 20:40:46interest, allow the conversation to flow
- 20:40:48naturally. Be attentive as the person
- 20:40:51may offer information you did not
- 20:40:53expect. Take notes, especially of the
- 20:40:56tips and expert advice. Keep track of
- 20:40:58time by checking halfway through your
- 20:41:00list of questions for how many minutes
- 20:41:02remain to stay within the agreed upon
- 20:41:04time frame. After completing the
- 20:41:06conversation, review your notes and
- 20:41:08highlight any points you want to
- 20:41:09research more. Make sure to send a thank
- 20:41:12you note to your interviewee,
- 20:41:14stay in contact and connect on LinkedIn
- 20:41:16or another online platform to continue
- 20:41:18expanding your network.
- 20:41:20In this video, you learned that the
- 20:41:23company's website is a good primary
- 20:41:25source of information about a company.
- 20:41:27Other sources such as LinkedIn, social
- 20:41:30media, and company publications can
- 20:41:32provide additional information about the
- 20:41:34company and the interviewers. Having an
- 20:41:37informal conversation with a person from
- 20:41:39the industry, company, or field of
- 20:41:41interest is an excellent source of
- 20:41:42information. Make sure to connect and
- 20:41:45prepare for the conversations.
- 20:41:47[Music]
- 20:41:58Welcome to Expert Viewpoints, conducting
- 20:42:00company research. In this video, experts
- 20:42:04share research methods they found useful
- 20:42:05when searching for a job and tips for
- 20:42:08effectively evaluating job postings.
- 20:42:11What research methods have you found to
- 20:42:13be beneficial when doing a job search?
- 20:42:14What tips can you provide to effectively
- 20:42:16evaluate a job posting?
- 20:42:20So, when I'm doing a job search and
- 20:42:22researching potential jobs, the first
- 20:42:25thing that I like to do is start online
- 20:42:28and um use tools like LinkedIn or even
- 20:42:32just Google, Indeed, places like that to
- 20:42:36search for available jobs. So, what kind
- 20:42:38of kinds of jobs are out there and are
- 20:42:42any of them relevant for the types of
- 20:42:44roles that I'm looking for or the skills
- 20:42:46that I have? And once I've done that
- 20:42:49kind of initial research, then I tap
- 20:42:52into my networking. So, uh, either going
- 20:42:56to networking events and meeting new
- 20:42:58people or tapping into my existing
- 20:43:01network of some peers that I have, some
- 20:43:04colleagues that I've had at different
- 20:43:06roles in my life and learning more about
- 20:43:09the roles that I've researched online.
- 20:43:13Um some other ways that you can use to
- 20:43:17uh research potential jobs are attending
- 20:43:20conferences and and different types of
- 20:43:22workshops. So uh now that we're uh back
- 20:43:27into a world where we can go attend
- 20:43:30events. Um there's a lot of industry
- 20:43:32conferences and you can go there and
- 20:43:34network and meet a lot of people. A lot
- 20:43:36of times they'll also at those
- 20:43:38conferences have uh entire sessions on
- 20:43:41people that are looking for roles in
- 20:43:43those industries. Um and then the same
- 20:43:45thing with workshops, going to workshops
- 20:43:48to improve your skills. Um you can also
- 20:43:51meet people, but a lot of that is also
- 20:43:54just networking.
- 20:43:55>> Well, one of the first things that you
- 20:43:56really need to do is to determine what
- 20:43:58job do you want and what is the
- 20:44:01definition or the role of that job. If
- 20:44:03you're looking for project management
- 20:44:05positions, then look for key titles. Use
- 20:44:08the key term project manager. Perhaps
- 20:44:11you're looking for program manager,
- 20:44:12portfolio manager, product owner, scrum
- 20:44:15master. The great thing about project
- 20:44:18management are there are many different
- 20:44:20jobs that you can go ahead and apply
- 20:44:23for. Use multiple sources as well.
- 20:44:26Sometimes, like a little kid, we go to
- 20:44:28the candy store and see a piece of candy
- 20:44:30and we're fixated on it. Well, the first
- 20:44:33job position you may come to might be
- 20:44:35good. However, take some time and review
- 20:44:38some other job positions as well. Do the
- 20:44:40good, better, and best approach. Try to
- 20:44:43prioritize different job positions based
- 20:44:45on who you are and what would make you
- 20:44:47happy. Last, but certainly not least, do
- 20:44:51some research on the company. go to
- 20:44:53their website, find out their vision,
- 20:44:55their mission, their culture, learn a
- 20:44:58little bit about some of their key
- 20:44:59performers, and just make sure that this
- 20:45:02job is a good fit for you.
- 20:45:04>> So, this is a tricky one because if you
- 20:45:06go online and look at what is available,
- 20:45:09you're going to get lots of different
- 20:45:11perspectives and some of them are very
- 20:45:13biased perspectives. I found that one of
- 20:45:15the most compelling things to do
- 20:45:17relative to a job search is to try to
- 20:45:19network. find people that actually work
- 20:45:21at that company that you can talk to
- 20:45:23individually and get their individual
- 20:45:25perspectives um so that you know clearly
- 20:45:28you know the company and what type of an
- 20:45:30environment it is that you would be
- 20:45:31moving into. Like I said there's lots of
- 20:45:33resources available. Um, some of them
- 20:45:36are they they make a strong attempt to
- 20:45:38be unbiased and really um unfiltered
- 20:45:42with the feedback, but if you spend some
- 20:45:44time um you can find really good
- 20:45:46feedback and information on the
- 20:45:47environment and the culture of a company
- 20:45:49that you're looking to pursue.
- 20:45:53>> What tips can you provide to effectively
- 20:45:55evaluate a job posting?
- 20:45:57>> When I'm evaluating a job posting, I
- 20:45:59look for a number of things. Um, most
- 20:46:02importantly, I think you want to look
- 20:46:04for companies that are very passionate
- 20:46:07about the role that they're hiring for.
- 20:46:10Um, many job postings are just listing
- 20:46:13skill sets. And um, it doesn't when when
- 20:46:16I read those types of job postings, it
- 20:46:18doesn't look to me many times like
- 20:46:20they're looking to hire a great person
- 20:46:22to fill that role. They're just trying
- 20:46:24to hire a warm body. So, I look for
- 20:46:26vocabulary where the job posting is is
- 20:46:29projecting a vision for what the role
- 20:46:32will will help the the company or the um
- 20:46:35people that are hiring, what what it
- 20:46:37will help them do. Um I look for very
- 20:46:39specific language that way. Um I also
- 20:46:42look for job postings that are scoped to
- 20:46:45the role. Um many times you'll read a
- 20:46:47job listing where it seems like the role
- 20:46:50will be doing everything. So, it's not
- 20:46:51just project management, it's
- 20:46:53development and it's marketing and it's,
- 20:46:55you know, quality control. Um, those
- 20:46:58types of roles can be very dangerous um
- 20:47:00because there's no limit to what the
- 20:47:03company will ask you to do. So, when
- 20:47:05you're looking at a job listing, make
- 20:47:06sure that you're looking for listings
- 20:47:08that are scoped appropriately to the
- 20:47:10role and the salary and look for those
- 20:47:12um job listings that show a little
- 20:47:14passion and interest in hiring you.
- 20:47:16So, when you evaluate a job posting, you
- 20:47:19need to look behind the scenes and it
- 20:47:20takes a little bit of time, similar to,
- 20:47:22you know, the time it takes to write a
- 20:47:24compelling resume or the time it takes
- 20:47:25to create a portfolio. It's going to
- 20:47:27take some time to do that research and
- 20:47:29that involves, like I mentioned, looking
- 20:47:31up people that might have firsthand
- 20:47:33experience. Um, not just taking at face
- 20:47:35value the first thing that you find on
- 20:47:37your internet search. Um, there are
- 20:47:40websites that uh offer really um
- 20:47:43powerful opinions from people that have
- 20:47:45worked at that company before, but the
- 20:47:47the bottom line here is that it takes
- 20:47:48time. You're not going to be able to
- 20:47:50gather that information in a couple
- 20:47:52minutes. I would say a real effective
- 20:47:55research process would take a couple
- 20:47:57hours to really get a feel for who it is
- 20:47:59that you're pursuing, their mission
- 20:48:01statement, their vision statement, what
- 20:48:02they're all about, and their history.
- 20:48:09[Music]
- 20:48:15Welcome to working with a thirdparty
- 20:48:17recruiter. After watching this video,
- 20:48:20you'll be able to identify the reasons
- 20:48:22to enlist with thirdparty recruiters,
- 20:48:25discuss the pros and cons of using
- 20:48:27thirdparty recruiters for job search,
- 20:48:29explain the considerations when
- 20:48:31selecting a third party recruiter.
- 20:48:34While looking for job postings on your
- 20:48:35own through company and job portals is
- 20:48:37ideal, you also have the option to use
- 20:48:40thirdparty recruiters to assist. Let's
- 20:48:43look at key reasons for enlisting the
- 20:48:44support of a third party recruiter.
- 20:48:47One reason for enlisting with a
- 20:48:49third-party recruiter is the hidden job
- 20:48:51opportunities.
- 20:48:53Companies may choose to post specific
- 20:48:55job listings publicly and provide other
- 20:48:57listings to third party recruiters to
- 20:48:59help with finding and shortlisting
- 20:49:01eligible candidates. When you enlist
- 20:49:03with a recruiter, they can potentially
- 20:49:05recommend you for a position that you
- 20:49:07might not have been aware of without
- 20:49:08their support.
- 20:49:10Another reason to enlist with thirdparty
- 20:49:12recruiters is to receive tips and best
- 20:49:14practices.
- 20:49:16Reputed thirdparty recruiters are
- 20:49:18experts in the hiring process. They can
- 20:49:21help you understand the application
- 20:49:22process, help you tailor your resume and
- 20:49:25cover letter, and help you prepare for
- 20:49:27the interview process.
- 20:49:29Finally, relationships that third party
- 20:49:31recruiters often have with their clients
- 20:49:33are a reason to enlist. The
- 20:49:35relationships can help you gain an
- 20:49:37opportunity to get your foot in the
- 20:49:38door. The recruiters can also help you
- 20:49:41understand the corporate culture and
- 20:49:43environment.
- 20:49:45While there are good reasons to enlist
- 20:49:46with a third party recruiter, it's
- 20:49:48important to understand that not all
- 20:49:50thirdparty recruiters are the same.
- 20:49:53There are some pros and cons of
- 20:49:54enlisting with a third party recruiter.
- 20:49:57Let's start with the pros. One advantage
- 20:49:59of using thirdparty recruiters is that
- 20:50:01they can bring the expertise and
- 20:50:03understanding of the hiring process.
- 20:50:05They can often streamline the hiring
- 20:50:07process for you and pave the way to find
- 20:50:09the right position. Next, third party
- 20:50:12recruiters have access to a large number
- 20:50:14of potential employers. They can get
- 20:50:16your resume in front of more hiring
- 20:50:18professionals than you can normally do
- 20:50:20alone. This increases the scope of jobs
- 20:50:22that you can apply to. Further, third
- 20:50:25party recruiters can often save you time
- 20:50:27by walking you through the application
- 20:50:28and hiring process and act as a liaison
- 20:50:31between you and the firm. Lastly, you
- 20:50:34have the flexibility to use thirdparty
- 20:50:36recruiters on an as required basis. They
- 20:50:39can also alert you when an
- 20:50:40organization's hiring needs change.
- 20:50:43Now, let's look at the cons of using
- 20:50:45thirdparty recruiters.
- 20:50:47One con with using thirdparty recruiters
- 20:50:49is the associated cost. There may be a
- 20:50:52cost associated with using a third party
- 20:50:54recruiter. Costs vary based on the type
- 20:50:57of position you're seeking and the
- 20:50:58particular recruiter you're working
- 20:51:00with. Lack of control is another con
- 20:51:02with using thirdparty recruiters. They
- 20:51:05are external to the organizations they
- 20:51:07support. As such, they have less control
- 20:51:09over the hiring process as compared to
- 20:51:11the organization's internal hiring
- 20:51:13staff. Quality of the thirdparty
- 20:51:15recruiters might become a con, for
- 20:51:17example, in terms of job listings they
- 20:51:20provide. Do your homework and ensure the
- 20:51:22recruiter you hire has a track record of
- 20:51:24success. The lead times can become a
- 20:51:27con. There are times when the third
- 20:51:29party recruiter may require more
- 20:51:31information from you before they are
- 20:51:32ready to begin the job search. In
- 20:51:34addition, they are dealing with multiple
- 20:51:36job applicants. So, addressing your
- 20:51:38needs may not be their immediate
- 20:51:40priority.
- 20:51:42Having reviewed the pros and cons of
- 20:51:43using thirdparty recruiters, it is
- 20:51:45evident that it's important to do your
- 20:51:47research and choose a reputable
- 20:51:49recruiter with a successful track
- 20:51:50record. Some key considerations when
- 20:51:53selecting a recruiter include recruiter
- 20:51:55type, specialization,
- 20:51:58location coverage, reputation, pricing.
- 20:52:02Let's look at each consideration in
- 20:52:04detail. What type of third party
- 20:52:06recruiter do you need? It's obvious to
- 20:52:09think that you will choose the recruiter
- 20:52:10that best meets your needs. However, you
- 20:52:13must also consider if you want to go
- 20:52:15with an employment agency, searched
- 20:52:16organization, or contract recruiter. An
- 20:52:19employment agency posts job listings and
- 20:52:22gets paid when a referred candidate is
- 20:52:23hired. Use an employment agency if you
- 20:52:26believe there are positions you were not
- 20:52:27aware of that they may be able to
- 20:52:29identify. A search organization
- 20:52:32identifies and screens applicants for
- 20:52:34organizations to identify qualified
- 20:52:36candidates. A search organization can
- 20:52:38help you find job openings that match
- 20:52:40your skills and expertise. They can also
- 20:52:42provide you with valuable advice on how
- 20:52:44to improve your resume, prepare for
- 20:52:46interviews, and negotiate salary and
- 20:52:48benefits.
- 20:52:50Contract recruiters seek out qualified
- 20:52:52candidates to satisfy an organization's
- 20:52:54contingency needs. Contract recruiters
- 20:52:57specialize in finding short-term
- 20:52:58contracts when you're not looking for
- 20:53:00employment as a full-time employee.
- 20:53:03Many recruiters specialize in certain
- 20:53:05technical areas such as information
- 20:53:07technology, finance, and healthcare.
- 20:53:10When you're identifying a potential
- 20:53:12recruiter, make sure that the recruiter
- 20:53:14specializes in the industry where your
- 20:53:15expertise and job expectations lie.
- 20:53:19You must also consider the recruiter's
- 20:53:20location presence. Some recruiters may
- 20:53:23reside in one area but support clients
- 20:53:25in numerous geographic regions. Ensure
- 20:53:28the recruiter you choose is able to
- 20:53:29network effectively in the locations
- 20:53:31where you are seeking employment.
- 20:53:33Most recruiters earn their fees from
- 20:53:35employers and their services are almost
- 20:53:38always free to job seekers. It's not
- 20:53:40illegal for a recruiter to charge you
- 20:53:42but it makes sense to use free to you
- 20:53:44resources in order to land a job.
- 20:53:47Reputation of a recruiter is also an
- 20:53:49important consideration. Do your due
- 20:53:51diligence. Ensure the recruiter you are
- 20:53:54dealing with has a positive reputation
- 20:53:55and track record of success.
- 20:53:58Make sure you do your homework about the
- 20:54:00recruiters. Use search engines to
- 20:54:02identify recruiters that specialize in
- 20:54:04your area of expertise. Research your
- 20:54:06recruiter. Try to learn as much as you
- 20:54:08can about their level of expertise.
- 20:54:11LinkedIn is a great source. If you can't
- 20:54:13locate your recruiter, proceed with
- 20:54:15caution. Learn as much as you can about
- 20:54:18your recruiter selection methods. For
- 20:54:20example, does the recruiter use
- 20:54:22established processes or yield to their
- 20:54:24gut instincts?
- 20:54:26In this video, you learned that the key
- 20:54:28reasons for enlisting with a thirdparty
- 20:54:30recruiter include hidden job
- 20:54:32opportunities, tips and best practices,
- 20:54:35leverage relationships.
- 20:54:37Some pros of enlisting with a thirdparty
- 20:54:39recruiter include expertise and
- 20:54:41understanding of the hiring process,
- 20:54:44increases scope, saves time, provides
- 20:54:47flexibility.
- 20:54:48Some cons of enlisting with a thirdparty
- 20:54:50recruiter include cost, lack of control,
- 20:54:54quality, lead times. When selecting a
- 20:54:58third party recruiter, consider the
- 20:54:59following: recruiter type,
- 20:55:02specialization,
- 20:55:03locations, coverage, reputation, and
- 20:55:07pricing. Make sure to do your homework
- 20:55:09about the recruiter.
- 20:55:11[Music]
- 20:55:22Welcome to drafting a resume. After
- 20:55:24watching this video, you'll be able to
- 20:55:27describe the contents of a resume, list
- 20:55:29tips to compose a basic resume, and
- 20:55:32explain how to optimize your resume for
- 20:55:34automated tracking and search engines.
- 20:55:37In a competitive job market, you must
- 20:55:39find ways to stand out. When you apply
- 20:55:41for a job, the first document you submit
- 20:55:43is a resume. A resume is a formal
- 20:55:46document with details such as your
- 20:55:48contact information, skills, experience,
- 20:55:50and education. It is your opportunity to
- 20:55:53impress the hiring team and stand out.
- 20:55:56Let's begin with the basic resume
- 20:55:58structure. Start the resume with your
- 20:56:00name. Follow the basic contact
- 20:56:02information such as your phone number
- 20:56:04and address, or at least that city and
- 20:56:06state. In modern résumés, you don't need
- 20:56:09to add the complete address. Make sure
- 20:56:12to include an accurate,
- 20:56:13professionallook, and valid email
- 20:56:15address. A professionallook email
- 20:56:17address can help establish your
- 20:56:19professional image. For example, instead
- 20:56:22of using an email such as, "Hey, my
- 20:56:24name's Mary.com,"
- 20:56:26use a professional email address such as
- 20:56:28basil.
- 20:56:31Also, add a valid phone number with text
- 20:56:34capability. Optionally, add links to
- 20:56:36other contact information such as your
- 20:56:38website and LinkedIn profile URL.
- 20:56:41Most hiring managers decide within a few
- 20:56:43seconds if they want to continue reading
- 20:56:45a resume. Relevant skills will help get
- 20:56:48their attention quickly. Add your key,
- 20:56:51hard, soft, and industry specific
- 20:56:53skills. List skills applicable to the
- 20:56:56position you are seeking. Include
- 20:56:58software and tools you know how to use.
- 20:57:00If a job posting mentions specific
- 20:57:02skills, highlight them in your resume.
- 20:57:05Only add skills relevant to the job
- 20:57:07description. Note, depending on the
- 20:57:10template, the skills section may be a
- 20:57:12list and include a graphical
- 20:57:13representation of your level of mastery
- 20:57:15in each skill. Next, include a headline.
- 20:57:19Use this section to have a one-s
- 20:57:20sentence description of yourself and
- 20:57:23what you're looking for or your
- 20:57:24accomplishments. A strong summary will
- 20:57:27help gain the recruiters and hiring
- 20:57:28managers attention.
- 20:57:30For example, a headline for a project
- 20:57:32manager might read, "Pmp certified
- 20:57:35project manager, delivering global
- 20:57:36projects on time and within budget.
- 20:57:39Optionally, you may add a profile
- 20:57:41summary with a concise career summary."
- 20:57:44The work experience section is usually
- 20:57:45the largest part of your resume. It
- 20:57:48should include your job history,
- 20:57:49accurate and relevant company and
- 20:57:51project details, and inclusive dates.
- 20:57:54When you add work experience details,
- 20:57:56use the following structure. Start with
- 20:57:58an action verb, then add the task
- 20:58:00details, and finally add the resulting
- 20:58:03quantifiable terms if possible. For
- 20:58:05example, manage the successful six sigma
- 20:58:08project to improve accounts receivable
- 20:58:10tracking, increased efficiency by 25%
- 20:58:13and reduced late receivables by 30%. If
- 20:58:16you're starting your career without
- 20:58:18relevant work experience, you can
- 20:58:20include a project section. List projects
- 20:58:22that show some experience. Eventually,
- 20:58:26you won't need project sections as you
- 20:58:28gain work experience. An education
- 20:58:31section highlights your formal academic
- 20:58:33history. Include college degrees,
- 20:58:35professional certificates,
- 20:58:37specializations, seminars, etc. Enter
- 20:58:40education history as follows.
- 20:58:42Achievement type and focus, for example,
- 20:58:45bachelor's degree, diploma, and
- 20:58:46certificate. Organization name such as
- 20:58:49university, school, and online platform.
- 20:58:53year completed and duration, GPA if
- 20:58:56applicable, and honors if you earned.
- 20:58:58Optionally, adding a section for hobbies
- 20:59:01or interest relevant to a particular job
- 20:59:03may boost your resume. If applying for a
- 20:59:05job where you have considerable
- 20:59:07professional experience, they aren't
- 20:59:08necessary. Add hobbies and interest when
- 20:59:11you have limited work and education
- 20:59:13experience. You have limited skills
- 20:59:15related to the job you're applying for,
- 20:59:16and relevant hobby will fill the gap. A
- 20:59:19job posting list responsibilities or
- 20:59:21duties aligning with your hobbies and
- 20:59:23interests. Additional sections may
- 20:59:25include publications, awards, technical
- 20:59:28training, and certifications. Include
- 20:59:30additional sections only if they are
- 20:59:32relevant and boost your resume. There
- 20:59:34are several free résumé templates
- 20:59:36available online with the required
- 20:59:37structure. However, you must ensure the
- 20:59:40résé template is compatible with an
- 20:59:42applicant tracking system ATS software.
- 20:59:45Organizations use the ATS software in
- 20:59:48the recruitment process, especially in
- 20:59:50technical fields. The software finds
- 20:59:52keywords in the application submissions
- 20:59:54and advances qualifying candidates
- 20:59:56further into the application process.
- 20:59:58Most ATS software works best with word
- 21:00:01processing software like Microsoft Word
- 21:00:02and Google Docs. Have a Microsoft Word
- 21:00:05or Google Docs version of your resume
- 21:00:07ready. You can provide alternative
- 21:00:10versions of your resume in many other
- 21:00:11formats including graphic, plain text,
- 21:00:14braille, PDF or accessible PDF, language
- 21:00:18other than English. ATS software might
- 21:00:21have a limited ability to read résumés
- 21:00:23formatted with multiple columns, images,
- 21:00:25and creative layouts or designs. If ATS
- 21:00:29cannot read the resume accurately, you
- 21:00:30may lose the opportunity even after
- 21:00:32being a qualified candidate. Here are
- 21:00:35some tips to build an effective resume.
- 21:00:37Keep your resume short. If you have lots
- 21:00:39of relevant experience, two pages are
- 21:00:42acceptable. Try to avoid more than two
- 21:00:44pages in length. If you use bulleted
- 21:00:46lists, ensure each item is meaningful
- 21:00:48and concise.
- 21:00:50Use present tense for your current
- 21:00:51position and past tense for earlier
- 21:00:53positions.
- 21:00:55Check spelling and grammar carefully.
- 21:00:58Make sure to proofread the resume.
- 21:01:00Double check your contact information
- 21:01:01and provide a professionallook email
- 21:01:03address.
- 21:01:05In addition, make your resume easily
- 21:01:07readable by ATS software and search
- 21:01:10engines by doing the following. Ensure
- 21:01:12contact information is at the top of the
- 21:01:14page. Use keywords purposefully. Include
- 21:01:17them in normal text. Don't just list
- 21:01:19them somewhere on the page. If your
- 21:01:21resume lacks terms, search algorithms
- 21:01:23will not find your resume. Align terms
- 21:01:26with job postings. Include emerging
- 21:01:28terminology and acronyms and ensure you
- 21:01:31refer to skills or technology using
- 21:01:33common terms.
- 21:01:34Provide relevant links and verify they
- 21:01:36work. Avoid using large image files in
- 21:01:39your portfolio or resume. Add alt text
- 21:01:41to every image you use. Users and
- 21:01:44website visitors who are visually
- 21:01:46impaired rely on alt text to understand
- 21:01:48graphic content.
- 21:01:50In this video, you learned that your
- 21:01:52resume is the first impression you make.
- 21:01:54The contents of a resume include name,
- 21:01:57contact information, headline, skills,
- 21:02:00work experience, and education. It is
- 21:02:03important for the resume to be ATS
- 21:02:05software compatible to improve selection
- 21:02:07for interviews. You must add keywords to
- 21:02:10your resume to improve its
- 21:02:11searchability.
- 21:02:13[Music]
- 21:02:24Welcome to expert viewpoints developing
- 21:02:26a project management resume.
- 21:02:29In this video, experienced industry
- 21:02:31professionals share tips for writing a
- 21:02:33compelling resume and provide tips for
- 21:02:36writing a resume specifically for a
- 21:02:38project management position.
- 21:02:39>> When I write a resume, one of the things
- 21:02:42that I will do is I will look at the job
- 21:02:44description and I will really read that
- 21:02:46job description carefully because if you
- 21:02:48do, you'll find there's keywords and
- 21:02:51areas of focus that that employer is
- 21:02:53really trying to find. And so if you can
- 21:02:56incorporate those keywords into your
- 21:02:58resume, it stands a much better chance
- 21:03:01for that to stand out. I mean, if your
- 21:03:02if your job description talks about
- 21:03:05leadership and employee development,
- 21:03:07your resume should talk about how you
- 21:03:09developed employees and and managed
- 21:03:11employees and led them um to increase
- 21:03:14levels of performance and competency. If
- 21:03:16it's talking about leadership, you
- 21:03:18should be able to talk about how you're
- 21:03:19a leader and some of the things that
- 21:03:20you've done that show that leadership.
- 21:03:22So basically, you really want to make
- 21:03:25your resume reflect very specifically to
- 21:03:29what the job description is looking for.
- 21:03:31>> I highly recommend that you do your
- 21:03:32personal portfolio first. Why? Because
- 21:03:36when you're developing your personal
- 21:03:38portfolio, in most cases, many of the
- 21:03:41things that you need to include in your
- 21:03:43resume, you will already have thought
- 21:03:45out. You will already have organized
- 21:03:47your thoughts. And essentially, it may
- 21:03:50be really a copy and paste into your
- 21:03:53resume. Find a template that is
- 21:03:55professional but doesn't go overboard.
- 21:03:59One of the things that you need to do is
- 21:04:01to find a template that is
- 21:04:04keyword search friendly. One of the
- 21:04:07things that a lot of HR screening groups
- 21:04:10will do is they will put your resume
- 21:04:12into a quick review
- 21:04:17application and they will look for key
- 21:04:19terms in there to see how well it
- 21:04:21matches your over the overall job
- 21:04:25description. So, make sure that you use
- 21:04:27the key terms that you want in your
- 21:04:29resume and make sure that the key terms
- 21:04:32that you're using match what the job
- 21:04:34description is asking for as well. Keep
- 21:04:38your resume short. A page and a half is
- 21:04:41good. Two pages should be your max. And
- 21:04:45a little bit about human nature.
- 21:04:48In most cases, according to statistics,
- 21:04:51a hiring manager with a lot of résumés
- 21:04:54to review for a given position is going
- 21:04:57to probably spend somewhere between 8 to
- 21:05:0010 seconds initially looking at your
- 21:05:02resume. So, what does that tell you? It
- 21:05:05says that the key information you needs
- 21:05:07to be right up front. As a matter of
- 21:05:09fact, most people when they read begin
- 21:05:12at the upper left hand corner of the
- 21:05:14page and then they start going down
- 21:05:16diagonally. And chances are pretty good
- 21:05:19that if your most important information
- 21:05:22is not in that upper quarter or upper
- 21:05:24third of the page, unfortunately it may
- 21:05:27be missed.
- 21:05:28>> Highlighting your achievements and
- 21:05:30skills uh is really important. Using
- 21:05:33really clear and concise language. So
- 21:05:36tailoring your language in your resume
- 21:05:39to fit the job role and the job
- 21:05:42description is important, but trying to
- 21:05:45avoid really flowery, flowy language and
- 21:05:49and a lot of industry jargon is uh a
- 21:05:52really good tip. And then finally, um
- 21:05:57just that tailoring your resume to the
- 21:05:59job description. So, looking for
- 21:06:02keywords, um, looking for ways that the
- 21:06:05job description talks about a specific
- 21:06:07skill or capability, and then tailoring
- 21:06:11your resume and changing your resume so
- 21:06:13that the language that you're using is
- 21:06:17similar to the the language in the job
- 21:06:19description is really helpful. Um, and
- 21:06:24that's not to say you should change your
- 21:06:27skills. If you have a skill set and you
- 21:06:30use that skill on a particular project
- 21:06:33um but the job description doesn't talk
- 21:06:35about that skill, don't you know change
- 21:06:38what you did.
- 21:06:41>> What additional tips can you provide
- 21:06:43when writing a resume for project
- 21:06:44management position?
- 21:06:46>> So, one of the things that most people
- 21:06:48that are looking at résumés really want
- 21:06:50to see is specific results. I mean, when
- 21:06:54you talk about how I'm organized and how
- 21:06:57I'm a thought leader or whatever, I
- 21:06:59mean, that's good. But really, one of
- 21:07:01the things that will make your resume
- 21:07:03stand out is when you can talk about
- 21:07:05specific accomplishments and the metrics
- 21:07:08that are associated with those
- 21:07:10accomplishments. If you are in charge of
- 21:07:13a budget, talking about the actual
- 21:07:15dollar amount that you were able to save
- 21:07:17or the actual um sales figures that you
- 21:07:20were able to accomplish or the actual
- 21:07:22quota that you were able to obtain. Um
- 21:07:25timelines, if you were able to uh hit
- 21:07:27your project goals within the timelines,
- 21:07:30talking about the weeks or the days or
- 21:07:32the hours associated with that and the
- 21:07:34implications of money associated with
- 21:07:37that. So any metric that you can
- 21:07:39introduce into your resume that shows
- 21:07:42specific results is really powerful.
- 21:07:45>> So I would uh say focus on the
- 21:07:48principles of project management and
- 21:07:51cater it for the specific roles. So not
- 21:07:53all principles are going to be um as
- 21:07:56high uh there probably be three or four
- 21:07:59that that jump up to the top and so
- 21:08:02really for the specific role that you're
- 21:08:04looking at. So really hone in your
- 21:08:06resume on showing the skills and the
- 21:08:09experiences that you have for those
- 21:08:11particular principles. Um but then also
- 21:08:14do call out any certifications you have,
- 21:08:17any specific training classes that
- 21:08:19you've taken in project management and
- 21:08:22even if they don't lead towards a
- 21:08:23certification, anything that you've gone
- 21:08:25above and beyond a bachelor's or a a
- 21:08:29associates degree or any formal
- 21:08:31education to further hone your abilities
- 21:08:34as a project manager. Some people say
- 21:08:36your resume shouldn't be longer than a
- 21:08:38page. I have no problem with longer
- 21:08:40resumes as long as it's not a complete
- 21:08:42history of your entire professional
- 21:08:45life. I really do just want to see, you
- 21:08:48know, maybe the last three years, maybe
- 21:08:49the last five years. And then I would
- 21:08:52say if you've had a gap uh in your in
- 21:08:54anything either in your education, in
- 21:08:56your experience, or in your work
- 21:08:58history, um don't address it in the
- 21:09:01resume. But I would be ready to address
- 21:09:03that in an interview because you may
- 21:09:05need you may be asked there to address
- 21:09:07any gaps.
- 21:09:12[Music]
- 21:09:18Welcome to drafting a cover letter.
- 21:09:20After completing this video, you'll be
- 21:09:22able to describe cover letter best
- 21:09:24practices. Review a cover letter
- 21:09:26example. Consider this scenario. You are
- 21:09:29among thousands of candidates who have
- 21:09:31applied for a job with their resume,
- 21:09:33which essentially provides a candidate's
- 21:09:34professional job history. So, how do you
- 21:09:37make your profile stand out during the
- 21:09:38HR review process? You can send across a
- 21:09:41cover letter with the resume when
- 21:09:42applying for a job. A cover letter is
- 21:09:44one of the most important items to
- 21:09:46develop when you begin your job search.
- 21:09:48You can use the cover letter to
- 21:09:50introduce yourself and your experience
- 21:09:51to a potential employer in a written
- 21:09:53format with an intent to gain their
- 21:09:55attention. Make a case why you would be
- 21:09:57a strong candidate for a particular
- 21:09:59position. Don't repeat all of your
- 21:10:01qualifications. Your resume and LinkedIn
- 21:10:04will contain the details. Just include
- 21:10:06enough information to show that you are
- 21:10:08wellqualified and interest the reader
- 21:10:10enough to schedule you for an interview.
- 21:10:12It's a good idea to draft a basic cover
- 21:10:14letter before you start applying for
- 21:10:15work. You'll adapt the letter to each
- 21:10:18position and application, of course, but
- 21:10:20you can start with a basic template. To
- 21:10:22write a basic cover letter, open with a
- 21:10:24greeting and address the letter to a
- 21:10:26specific person whenever possible. If
- 21:10:28you don't know the name, address it to
- 21:10:29the title of the person you hope will
- 21:10:31see the letter, such as, "Dear hiring
- 21:10:33manager, use correct business
- 21:10:35punctuation."
- 21:10:37An example is, "Dear Miss Ericson, in
- 21:10:40the first paragraph, state the title of
- 21:10:42the job to which you're applying and why
- 21:10:44you feel you might be a good fit." It's
- 21:10:46also sometimes useful to mention where
- 21:10:47you saw the job listed or who referred
- 21:10:49you. And it can be very effective if you
- 21:10:52can express why you're enthusiastic
- 21:10:53about the company. For example, I was
- 21:10:56excited when my colleague Jenna Madison
- 21:10:58told me your company had an opening for
- 21:11:00an IT project manager. I have admired
- 21:11:02the products developed by Magnus and
- 21:11:04Software for many years and I would be
- 21:11:07very interested in joining your team.
- 21:11:08I'm a project management professional
- 21:11:10PMP certified project manager with four
- 21:11:13years of professional experience and
- 21:11:15skills that match your needs and I think
- 21:11:17I would be a strong candidate. I also
- 21:11:20possess a certified scrum master CSM
- 21:11:22certification. Next, build a case for
- 21:11:25your strengths as a candidate. Site a
- 21:11:27few examples from your expertise that
- 21:11:29match the skills they mention in the job
- 21:11:30listing. Draw parallels between the
- 21:11:33listing and your resume and personal
- 21:11:35portfolio. Qualify your experiences when
- 21:11:38possible. However, keep this brief and
- 21:11:41focused. It is important that you keep
- 21:11:43some of the best examples and work
- 21:11:44samples ready to discuss further when
- 21:11:46you interview.
- 21:11:48Let's look at a sample for this section.
- 21:11:51In my most recent role, I managed
- 21:11:53development of an issues management
- 21:11:54system that automated our IT bug
- 21:11:57tracking process. The new system
- 21:11:59improved resolutions by 25% and
- 21:12:02eliminated recurring bugs by 50%.
- 21:12:05Our team used a combination of Jira and
- 21:12:08Smart Sheet to successfully complete the
- 21:12:10project using a hybrid project
- 21:12:11management approach one month ahead of
- 21:12:13schedule. Finally, close by restating
- 21:12:16your interest. Say you hope to meet with
- 21:12:18them further and then add a polite sign
- 21:12:20off. Let's review the example. Thank you
- 21:12:23for your consideration. I would love to
- 21:12:25bring my project management skills to
- 21:12:27Magnus and Software and I'm eager to
- 21:12:29discuss the contributions I can make to
- 21:12:31your team. Best regards, Rajeskumar. On
- 21:12:34a practical note, you will want to save
- 21:12:37your letter in Microsoft Word format
- 21:12:39because many companies prefer it. You
- 21:12:41will also need a plain text version so
- 21:12:43that you can easily copy and paste the
- 21:12:45text into an online application form. It
- 21:12:48can be useful to save it as a PDF file,
- 21:12:51although you'll have to create a new
- 21:12:52version every time you modify the
- 21:12:54letter. Have a friend proofread your
- 21:12:56letter so that you're not embarrassed or
- 21:12:57even eliminated because your letter is
- 21:12:59full of errors. In this video, you
- 21:13:02learned that the cover letter is one of
- 21:13:04the most important resources. writing
- 21:13:06clearly and concisely to catch interest
- 21:13:08of a hiring manager and make a good case
- 21:13:10for yourself as a candidate. Your cover
- 21:13:13letter may motivate them to read your
- 21:13:14resume and hopefully call you for an
- 21:13:17interview.
- 21:13:22[Music]
- 21:13:28Welcome to submitting your application.
- 21:13:31After watching this video, you'll be
- 21:13:32able to explain the different approaches
- 21:13:35for application submission, outline the
- 21:13:37presubmission checks for a resume,
- 21:13:39summarize the presubmission checks for a
- 21:13:41cover letter, list additional documents
- 21:13:43required when submitting an application,
- 21:13:46describe the document naming convention
- 21:13:48and organization.
- 21:13:50Every company has its own approach for
- 21:13:51application submission. It is therefore
- 21:13:55important that you understand the
- 21:13:56approach or the process. For example,
- 21:13:59some companies might prefer you to fill
- 21:14:01out an online application and attach the
- 21:14:02required documents through their
- 21:14:04website. Others might use websites like
- 21:14:06LinkedIn where you can send across your
- 21:14:08resume and cover letter. Another option
- 21:14:10is where you might need to send across
- 21:14:12the application to a specific email
- 21:14:13address. For some roles, there might be
- 21:14:16walk-in interviews where you will need
- 21:14:18to fill in the required details and
- 21:14:19submit a printed copy of your resume.
- 21:14:22Whatever the approach, follow the
- 21:14:24directions carefully and do exactly as
- 21:14:25the job listing says.
- 21:14:28Irrespective of the approach, you will
- 21:14:29mandatorily need to submit a resume.
- 21:14:32Also, while a cover letter may not
- 21:14:33always be mandatory, a best practice is
- 21:14:36to send a cover letter, even if it isn't
- 21:14:37required. If you've already drafted
- 21:14:40basic versions of the resume and cover
- 21:14:41letter, you're in a good position. Make
- 21:14:44sure to customize or update the
- 21:14:45documents based on the job requirements
- 21:14:47and include the keywords. For example, a
- 21:14:50job posting may mention predictive
- 21:14:52skills such as developing scope
- 21:14:54documentation, calculating critical
- 21:14:56path, developing a phased budget, and
- 21:14:59developing a comprehensive risk
- 21:15:00register. Another job posting may
- 21:15:03require an understanding of user
- 21:15:04stories, product backlog development,
- 21:15:07executing effective sprints, and
- 21:15:09conducting retrospectives. Make sure to
- 21:15:12include information that shows your
- 21:15:13skills and experience that meet the
- 21:15:15requirements. Make sure that the resume
- 21:15:17and cover letter contains the keywords
- 21:15:19listed in the job posting. Let's review
- 21:15:22some checks to make before submitting a
- 21:15:24resume. Is your resume up to date with
- 21:15:26the latest contact information? Is the
- 21:15:28formatting of the resume layout
- 21:15:30accurate? Are the contents of the resume
- 21:15:32grammatically correct? Have you added a
- 21:15:35professional email address? Is the
- 21:15:37content cliche vocabulary and
- 21:15:39jargon-free?
- 21:15:41Are the job experience and hobbies
- 21:15:42relevant to the job? Have you included
- 21:15:45key words from the job posting in the
- 21:15:47resume? Make sure that the response to
- 21:15:49all of the questions is yes. If not,
- 21:15:52make the required adjustments.
- 21:15:54Similarly, with the cover letter, make
- 21:15:56sure to perform the following checks
- 21:15:58before submission. Is the formatting for
- 21:16:00the cover letter layout accurate? Are
- 21:16:02the contents grammatically correct? Is
- 21:16:05the cover letter addressed to the
- 21:16:06correct person? And is the name spelled
- 21:16:08correctly? Is the cover letter about
- 21:16:10half a page and concise? Is the cover
- 21:16:13letter tailored to the specific company
- 21:16:14and job opening? Is the tone of the
- 21:16:17cover letter professional and confident?
- 21:16:19Have you listed references in that
- 21:16:20letter? Have you provided reasons
- 21:16:23explaining why you were no longer
- 21:16:24working for your previous employer or
- 21:16:26including other issues that may be
- 21:16:28better to discuss in an interview if
- 21:16:29necessary?
- 21:16:31Next, let's review the supporting
- 21:16:33documents that a potential employer
- 21:16:35might request to validate. Some common
- 21:16:37documents include educational
- 21:16:39transcripts to validate qualification,
- 21:16:41writing samples and portfolios to check
- 21:16:43your work, professional certificates to
- 21:16:45check technical qualification, and list
- 21:16:48of references and letters of
- 21:16:49recommendation. Supporting documents
- 21:16:51will vary based on the job role and
- 21:16:53company. Be sure to follow all the
- 21:16:55instructions provided by the company to
- 21:16:57avoid submitting an incomplete job
- 21:16:58application.
- 21:17:00After you have checked all the
- 21:17:01documents, you are ready to upload or
- 21:17:03attach the documents. Before uploading,
- 21:17:06ensure you have used a consistent naming
- 21:17:08convention for your files. Include your
- 21:17:10full name as part of the file name. For
- 21:17:12example, if your resume is named
- 21:17:14john_smith-res.pdf,
- 21:17:17then all the remaining documents should
- 21:17:18follow a similar naming convention. In
- 21:17:21this example, the cover letter will be
- 21:17:22john_mith-co_let.pdf.
- 21:17:27Limit special characters to underscores
- 21:17:29and hyphens. If you incorporate blank
- 21:17:31spaces in your file name, be sure to use
- 21:17:33them consistently. Do not include
- 21:17:35version numbers as a part of your file
- 21:17:37names. And be sure to submit all the
- 21:17:39requested documents at once. In short,
- 21:17:42name your files consistently and in a
- 21:17:44way that if sorted alphabetically, all
- 21:17:46of your files appear together in the
- 21:17:47file search. This helps the recruiter
- 21:17:50identify all the files that you
- 21:17:52submitted. A tabular overview is
- 21:17:54effective.
- 21:17:55Once you have the naming convention done
- 21:17:57and all the required checks, you can
- 21:17:59submit your job application. Another
- 21:18:01thing to keep in mind when applying to
- 21:18:04jobs is the limit on the number of
- 21:18:05applications you can submit. Usually,
- 21:18:08there is no limit. However, some
- 21:18:10companies limit the number of
- 21:18:11applications you can send in a
- 21:18:13particular period. So, you'll need to be
- 21:18:15strategic and choose the jobs that are
- 21:18:17most interesting to you. One approach is
- 21:18:19to first apply for the position you
- 21:18:21believe you are most qualified for or
- 21:18:23that interest you most. After applying,
- 21:18:25contact human resources or HR or a
- 21:18:28hiring manager to ask for advice about
- 21:18:30whether you should apply for each job
- 21:18:31you are interested in or if it's best to
- 21:18:34avoid duplicate application submissions.
- 21:18:36They should be able to tell you whether
- 21:18:38they can forward your application or
- 21:18:40whether they allow you to create a
- 21:18:41profile that lets you easily apply for
- 21:18:43multiple jobs.
- 21:18:45In this video, you learned that it is
- 21:18:48important to understand the application
- 21:18:49submission approach such as online
- 21:18:51application via sites like LinkedIn,
- 21:18:54email, and walk-in. Make sure to perform
- 21:18:57presubmission checks on the resume and
- 21:18:59the cover letter. You might need to
- 21:19:01submit supporting documents such as
- 21:19:03education transcripts, certificates, and
- 21:19:05references.
- 21:19:07Use consistent naming for the documents.
- 21:19:10[Music]
- 21:19:21Welcome to preparing for the interview.
- 21:19:23After watching this video, you'll be
- 21:19:24able to list the best practices when
- 21:19:27preparing for an interview, identify
- 21:19:29potential questions you can ask an
- 21:19:31interviewer, discuss what the
- 21:19:32interviewer is looking for. Preparing
- 21:19:35for the interview is critical, and can
- 21:19:37also help reduce any nervousness. Let's
- 21:19:39review some best practices when
- 21:19:41preparing for an interview. Best
- 21:19:43practice one, understand as much as you
- 21:19:45can about the company you will be
- 21:19:46interviewing for. Also, try to learn
- 21:19:49about the division or part of the
- 21:19:50company that has the position opening.
- 21:19:52Use your contacts and research skills to
- 21:19:54learn about what they do and how they
- 21:19:56work. Best practice two, review what you
- 21:19:59know about the position and thoroughly
- 21:20:01research areas that are less familiar to
- 21:20:03you. As you research the position, you
- 21:20:05might be able to learn more about the
- 21:20:07management practices mentioned in the
- 21:20:08position announcement, such as project
- 21:20:10management methods used by the company.
- 21:20:13Try understanding the company's tools
- 21:20:14and techniques, such as Microsoft
- 21:20:16Project or Smart Sheet. You can also
- 21:20:19refresh your knowledge and skills that
- 21:20:21you might not have practiced in a while.
- 21:20:23If the job posting mentions a particular
- 21:20:25practice such as Scrum, you might get
- 21:20:28asked to explain your experience with
- 21:20:29agile methodologies. Be ready with a
- 21:20:32succinct definition or description. A
- 21:20:34brief set of notes can be helpful during
- 21:20:36the interview so you don't have to pause
- 21:20:38to remember key terms, steps, or
- 21:20:40components. Best practice three,
- 21:20:43determine the appropriate attire. Your
- 21:20:45attire depends somewhat on the company
- 21:20:47culture. Try to determine dress norms
- 21:20:49ahead of time. Most importantly, always
- 21:20:51be well-groomed and professional. Best
- 21:20:54practice four, if you're traveling for
- 21:20:56an on-site or face-to-face interview
- 21:20:58site, be 10 to 15 minutes early.
- 21:21:01Arriving early gives you time to gather,
- 21:21:03review, and focus. Arriving early also
- 21:21:06helps make a good impression on the
- 21:21:07interviewer. If you are in a virtual
- 21:21:09interview, ensure that your surroundings
- 21:21:11are quiet, pleasant, and tidy. Best
- 21:21:14practice five, have something to write
- 21:21:16with, take notes, and jot down questions
- 21:21:18you might want to ask later in the
- 21:21:20interview. Best practice six, prepare
- 21:21:23some questions ahead of time. Questions
- 21:21:25reflect that you are prepared, serious,
- 21:21:27and interested. Also, think about what
- 21:21:29really interests or excites you about
- 21:21:31the position. Interviewers want to know
- 21:21:33that you really do want the position. It
- 21:21:36is reasonable to ask who will conduct
- 21:21:37the interview and whether it will be a
- 21:21:39panel of interviewers. If possible,
- 21:21:41learn something about your interviewers.
- 21:21:43Here's a list of potential questions to
- 21:21:45consider as the interview progresses.
- 21:21:47How can someone be successful in this
- 21:21:49role? How would you manage the
- 21:21:51performance of the employees working in
- 21:21:52this role? Can you provide a few
- 21:21:55examples of challenges someone may
- 21:21:56encounter in this role? What is the best
- 21:21:59way to collaborate to achieve success?
- 21:22:01How will you be working with the
- 21:22:02employee who will fill this position or
- 21:22:04role? Can you share what you enjoy most
- 21:22:07about working in this organization?
- 21:22:10Best practice seven. Another important
- 21:22:12aspect of an interview is what you can
- 21:22:14potentially expect from an interviewer.
- 21:22:17Try to come up with a list of possible
- 21:22:18questions you might be asked. Practice
- 21:22:21verbally answering the questions before
- 21:22:22the interview. Practicing in front of a
- 21:22:25mirror is helpful for some people.
- 21:22:27Recording your answers into a phone and
- 21:22:28playing them back to see how you sound
- 21:22:30can also be effective. If possible,
- 21:22:32practice with a mentor or friend and
- 21:22:34solicit their feedback. One typical
- 21:22:36interview question that you might want
- 21:22:38to have ready to answer is, "Tell me
- 21:22:40about yourself and describe how you are
- 21:22:42qualified for this position."
- 21:22:43Practice your elevator pitch that
- 21:22:45introduces yourself and highlights your
- 21:22:47strengths. Answer this question with
- 21:22:49poise and confidence.
- 21:22:51Here's a list of additional common
- 21:22:53interview questions you can expect to be
- 21:22:54asked. Tell me what you know about our
- 21:22:57company. What are you interested in
- 21:22:59applying for this position? How would
- 21:23:01you describe your communication and
- 21:23:02collaboration skills? Are you
- 21:23:04comfortable working with a team? What is
- 21:23:06the achievement you are most proud of?
- 21:23:08Can you provide an example of how you
- 21:23:10overcame adversity? What are your salary
- 21:23:13expectations for this position? Where do
- 21:23:15you envision yourself or your career in
- 21:23:1710 years? How do others perceive you?
- 21:23:21What are your hobbies? What do you do in
- 21:23:23your spare time? Best practice eight.
- 21:23:26What happens if you don't know the
- 21:23:27answer to a question? Don't panic. There
- 21:23:30are different ways that you can respond.
- 21:23:31You might say, "I'm not familiar with
- 21:23:33this topic, but I am curious to learn
- 21:23:35more." It's possible you know about
- 21:23:37something similar and can mention that.
- 21:23:39If you aren't sure but have a guess, you
- 21:23:41might say, "I'm not certain, but I'm
- 21:23:42going to take an educated guess and give
- 21:23:44my reasoning." Coming close to a correct
- 21:23:46answer is better than a blank stare.
- 21:23:48However, it is better to admit that you
- 21:23:50don't know than try to fake it. Best
- 21:23:52practice nine. When you reach an area
- 21:23:54where you have gaps, you can anticipate
- 21:23:56that the interviewer will probe with
- 21:23:58follow-up questions about it. Give the
- 21:24:00best answer you can and try not to let
- 21:24:02it throw you off track. Most
- 21:24:04interviewers realize you won't know the
- 21:24:05answers to all their questions. You can
- 21:24:07also explain that you were aware of this
- 21:24:09gap and explain what you were doing to
- 21:24:11bridge it, such as reading on your own
- 21:24:12or taking a course. Best practice 10.
- 21:24:16Finally, be sure you have the name and
- 21:24:18contact information for follow-up
- 21:24:19questions and write a thank you note to
- 21:24:21the interviewer.
- 21:24:23In this video, you learned that some
- 21:24:25best practices to consider when
- 21:24:27preparing for an interview include have
- 21:24:29enough knowledge about the company.
- 21:24:31Learn about the position and the
- 21:24:32company's methods. Determine the
- 21:24:34appropriate attire. Reach the interview
- 21:24:36location early. Prepare some questions
- 21:24:39ahead of time. Make up potential
- 21:24:41interviewer questions and practice your
- 21:24:43responses. When asked, "Tell me about
- 21:24:45yourself," use the elevator pitch. Avoid
- 21:24:48a blank stare. Admit you don't know the
- 21:24:51answer rather than fake it. name and
- 21:24:53contact information for follow-ups.
- 21:24:55There are several questions that an
- 21:24:57interviewer can ask on a wide variety of
- 21:24:59topics.
- 21:25:04[Music]
- 21:25:10Welcome to Expert Viewpoints, the first
- 21:25:12stage interview. In this video, get tips
- 21:25:15for a successful first stage interview,
- 21:25:17hear about possible interview
- 21:25:19challenges, and get advice for
- 21:25:20overcoming those challenges.
- 21:25:23Well, first of all, let's define what a
- 21:25:24first stage interview is. A first stage
- 21:25:27interview is normally a preliminary
- 21:25:29interview. This is where you're going to
- 21:25:31be asked some general questions,
- 21:25:33possibly by someone from HR or some
- 21:25:37interviewer who wants to know a little
- 21:25:39bit more about yourself. Normally the
- 21:25:41purpose of having a first stage
- 21:25:43interview is to screen out applications
- 21:25:46when you have numerous applicants for a
- 21:25:49given job. So the focus is to make a
- 21:25:54very good first impression so that your
- 21:25:57resume is not pulled and it passes the
- 21:25:59test and you get another chance to move
- 21:26:02forward in the interview process. First
- 21:26:05and foremost, have a good introduction
- 21:26:06and a good greeting. Shake hands. Show
- 21:26:10your smile, express appreciation for the
- 21:26:13opportunity,
- 21:26:14and have your elevator pitch ready as
- 21:26:17well. The questions normally that are
- 21:26:19asked at a first stage interview are,
- 21:26:22"Who are you, what do you do, and what
- 21:26:24do you want?" And your elevator pitch is
- 21:26:26going to accommodate that very, very
- 21:26:29well.
- 21:26:30Be ready at this particular stage to
- 21:26:33share some of the key skills that you
- 21:26:34think may be important directly tied to
- 21:26:37the position that you're interviewing
- 21:26:39for. And be ready for basic questions
- 21:26:41such as who are you? Why do you want
- 21:26:44this job? And why do you think you are
- 21:26:48the best qualified individual for this
- 21:26:51particular position?
- 21:26:53When preparing for an interview, the
- 21:26:55areas where you can really focus on I
- 21:26:57think is that elevator pitch that you
- 21:27:00know is important to make sure that you
- 21:27:01understand from a high level what you
- 21:27:03can do and what skills that you bring to
- 21:27:05the table. The other thing that makes a
- 21:27:07first stage interview successful is
- 21:27:10really understanding what the role is
- 21:27:12and what the needs of the company are
- 21:27:14and what you can do to fill those needs.
- 21:27:17So for example, understanding a little
- 21:27:19bit about the background of the company,
- 21:27:21the development of the company or the
- 21:27:23position, understanding what challenges
- 21:27:25the company's faced in the past and what
- 21:27:28they're facing now can really help have
- 21:27:30give you a good vocabulary to discuss
- 21:27:32with a hiring manager when you're
- 21:27:34applying for a role. The other thing I
- 21:27:37always think about when I'm doing a
- 21:27:39first stage interview is the idea that
- 21:27:42they need you as much as you need them.
- 21:27:45Um, I think that helps take the edge off
- 21:27:47from the pressure. A lot of people feel
- 21:27:49very nervous, particularly in that first
- 21:27:50stage of an interview process. And I
- 21:27:53think if you embody the idea that if the
- 21:27:55company didn't need you, they wouldn't
- 21:27:57be, you know, looking for a role to
- 21:27:59fill, right? So, they need you just as
- 21:28:01much as you need them. And that can
- 21:28:04really help you create a dialogue with
- 21:28:06the hiring manager rather than feeling
- 21:28:08like you're, you know, you're under
- 21:28:10under pressure and you're under the gun.
- 21:28:11I think it really helps to take the edge
- 21:28:13off of that conversation.
- 21:28:18>> What are some interview challenges an
- 21:28:19applicant might encounter and how can
- 21:28:21they overcome them?
- 21:28:23>> So, first stage interview is, you know,
- 21:28:26you may end up talking to a recruiter
- 21:28:28and not somebody who actually is in the
- 21:28:31role uh that you want to get into. And
- 21:28:34so, they're going to have some uh
- 21:28:36standard questions that they'll ask and
- 21:28:38those should be very straightforward and
- 21:28:40easy for you. And then they'll probably
- 21:28:42have some qualifying questions that will
- 21:28:45get you to the next level of interview.
- 21:28:47So if the person is not enrolled,
- 21:28:49they're not going to necessarily know
- 21:28:52what it is that you're talking about and
- 21:28:54and they may not understand the question
- 21:28:56that they're even asking you. And so
- 21:28:59really be prepared to answer, be
- 21:29:01prepared to be concise, and don't use a
- 21:29:04lot of jargon. Um you don't want to
- 21:29:07confuse the person who's interviewing
- 21:29:09you. you know, if you're given an
- 21:29:10opportunity to, you know, provide just
- 21:29:13one last thing or or how, you know, a
- 21:29:16closing on the interview, that's your
- 21:29:18elevator speech. And that's what you
- 21:29:19want them to remember. They they'll
- 21:29:21remember the first thing and the last
- 21:29:23thing. And so, you want to, you know,
- 21:29:25knock their socks off right from out of
- 21:29:27the gate and then give them something
- 21:29:29that is really long lasting at the end.
- 21:29:32And then comes your follow-up. So,
- 21:29:34you're going to immediately send a thank
- 21:29:36you letter. And by immediately, I mean
- 21:29:38within an hour. That thank you letter
- 21:29:40should be in their inbox time. They're
- 21:29:42going to forget about you in the two
- 21:29:43days, three days that it takes to get
- 21:29:45there. Send the thank you letter an
- 21:29:47email right away. And then get your
- 21:29:49follow-up schedule down. So, if this is
- 21:29:52something that you're super keen on
- 21:29:54getting, then follow up, you know, on a
- 21:29:56regular schedule afterwards to get the
- 21:29:58next interview scheduled and then um be
- 21:30:01ready to go. It may be that they notify
- 21:30:03you the morning and you've got to be
- 21:30:05ready in an hour or in the afternoon and
- 21:30:07so so just be ready to
- 21:30:11>> So
- 21:30:13one of the things that's really
- 21:30:15interesting about interviewing it's kind
- 21:30:16of like a dance. You you're answering
- 21:30:18questions that are very scripted and
- 21:30:22strategic that that the interviewer is
- 21:30:24asking you. And so your responses need
- 21:30:27to be on target. They need to be
- 21:30:29strategic and they need to be succinct.
- 21:30:30One of the things that I've seen over
- 21:30:32and over again when I'm looking at an
- 21:30:35interview that doesn't go very well is
- 21:30:37when an interviewer asks a question and
- 21:30:40the interviewee then will give a
- 21:30:42fiveminute response that is not going to
- 21:30:46target in and zero in on what is
- 21:30:48specifically being looked for. So pay
- 21:30:50special attention to the question being
- 21:30:52asked. It's okay to pause for a moment.
- 21:30:54And that's that's one of the bits of
- 21:30:56advice that I would give is the question
- 21:30:58is asked, don't feel like you have to
- 21:31:00give an immediate response. Pause for a
- 21:31:01moment. Really digest the question being
- 21:31:04asked and then give your strategic and
- 21:31:06succinct response. Timing is really,
- 21:31:09really important. There's not a lot of
- 21:31:10it in interview. So, you want to use
- 21:31:12that time as in the most effective
- 21:31:15fashion that you can.
- 21:31:22[Music]
- 21:31:27Let's check out Robert's first round
- 21:31:29interview. In this interview, Robert
- 21:31:32Mason has applied for an entry-level
- 21:31:34project manager role at ABC Company, a
- 21:31:36large electronics manufacturing company.
- 21:31:39The interviewer from ABC is Leslie
- 21:31:41Porter, a senior project manager. Please
- 21:31:43note, like in any interview, not all
- 21:31:45questions might be correct. Instead,
- 21:31:47focus on how the interviewee, Robert
- 21:31:48Mason, answer the questions.
- 21:31:51>> Hi, Robert. It's so nice to meet you. My
- 21:31:54name is Leslie Porter. I'm the senior
- 21:31:56project manager here at ABC Company. I
- 21:31:59would be your manager if you were hired
- 21:32:01for this position. Uh, so it's great to
- 21:32:03meet you. I'd love to learn a little bit
- 21:32:05more about you and what got you into
- 21:32:07project management.
- 21:32:09>> Well, thank you very much, Leslie. It's
- 21:32:11a pleasure to meet you. And first and
- 21:32:12foremost, I just want to say thank you
- 21:32:14for taking the time to allow for this
- 21:32:18interview for this particular position.
- 21:32:20I'm very excited to meet you and to talk
- 21:32:22a little bit about myself and share a
- 21:32:25little bit about project management. Uh
- 21:32:28I have a long career in marketing but a
- 21:32:31few years ago I took a continuing
- 21:32:33education course in project management
- 21:32:36and it really captured my imagination
- 21:32:37and I I felt project management was a
- 21:32:40very exciting competency. So I was able
- 21:32:42to talk my current company into giving
- 21:32:45me a project coordinator position which
- 21:32:48I've held for the past two years. I've
- 21:32:50had the opportunity to work on a number
- 21:32:53of different projects with some very
- 21:32:55skilled project managers.
- 21:32:58We've rolled out some new retail stores.
- 21:33:01In addition, I've also worked with
- 21:33:03product owners to help them roll out
- 21:33:06some new products. And I actually got an
- 21:33:08opportunity to work on some process
- 21:33:10improvement projects using six sigma
- 21:33:12methodology as well. So, I'm very
- 21:33:15excited about project management and
- 21:33:17continually hoping to learn more.
- 21:33:20That's great. Robert, why are you
- 21:33:22interested in this position?
- 21:33:25>> Well, I'm very
- 21:33:27enhanced by your company. I'm very
- 21:33:30impressed by your company. I use a lot
- 21:33:32of the products that your company uses
- 21:33:35as well. And one of the things that I
- 21:33:37found is that your products are
- 21:33:39consistently of a very, very high
- 21:33:40quality. You have great functionality.
- 21:33:44The products do what they're supposed to
- 21:33:46do. They're easy to use. They're very
- 21:33:49very reliable. They're high performance
- 21:33:51products. And in addition, one of the
- 21:33:54things that I found whenever I had a
- 21:33:56problem is that your support team is
- 21:33:59outstanding as well. So, I think you
- 21:34:01have a very effective company and I'd
- 21:34:03love to be a part of it.
- 21:34:05>> Thank you. What do you know about our
- 21:34:07company and what we do?
- 21:34:09>> Well, I did a little bit of research on
- 21:34:11the internet and I noticed that you have
- 21:34:14a variety of different electronic
- 21:34:16devices. As a matter of fact, you're a
- 21:34:18leader in electronic devices, but along
- 21:34:20with that, you're involved in health
- 21:34:22care and a lot of different other
- 21:34:24products as well, which is very, very
- 21:34:26exciting. As a matter of fact, one of
- 21:34:28the things that I've noticed is that
- 21:34:30your company has a really great
- 21:34:32smartwatch product uh portfolio, and if
- 21:34:36I can share, this is your product. So,
- 21:34:39obviously, I buy into your product and
- 21:34:41the quality that you have there. So, I'm
- 21:34:43very impressed by your company and would
- 21:34:45love to be a part of it.
- 21:34:47Thank you, Robert. You sounds like you
- 21:34:49did your homework. Uh, so tell me, what
- 21:34:52are your biggest strengths and why?
- 21:34:54>> Well, let me go ahead and give you a
- 21:34:57couple of them. First of all, I think
- 21:34:58I'm a very, very good time manager. Uh,
- 21:35:01when I was taking my project management
- 21:35:03course, I learned that the ultimate goal
- 21:35:06of a good project manager is to be on
- 21:35:08time, within budget, and provide value
- 21:35:11in the products to the customers as
- 21:35:13well. And for the most part, all of the
- 21:35:16projects that I had the opportunity to
- 21:35:18work were done on time and within budget
- 21:35:21and the customers seemed very very
- 21:35:23happy. In addition, I think I have a
- 21:35:25pretty good understanding of how project
- 21:35:27management and product management works
- 21:35:30together as well. I worked with a lot of
- 21:35:32really great product managers and I
- 21:35:34found that area to be quite exciting.
- 21:35:37And one of the things that I noticed
- 21:35:39about your company is that you do use
- 21:35:42some agile product development and that
- 21:35:46would be fun to be a part of it.
- 21:35:49>> Yes indeed. My next question is a little
- 21:35:51more difficult perhaps. Uh what would
- 21:35:54you say are your biggest weaknesses and
- 21:35:56why?
- 21:35:58>> Well, I'll go ahead and share what
- 21:35:59others have shared with me. I have a
- 21:36:02tendency sometimes to be a bit of
- 21:36:04perfectionist. I want everything to be
- 21:36:07100% right. And I realize that in a real
- 21:36:10world environment sometimes that's not
- 21:36:13possible. And you have to accept that
- 21:36:1580% solution. So I'm not going to go
- 21:36:18ahead and yield. I want everything to be
- 21:36:20100% correct. But I also need to
- 21:36:23understand that I need to be a little
- 21:36:25bit more patient and I am working on
- 21:36:27that as best I can.
- 21:36:31What would you say is your greatest
- 21:36:33personal achievement up until this
- 21:36:35point?
- 21:36:36>> Well, as I mentioned earlier, I was able
- 21:36:39to get involved in some six sigma
- 21:36:41projects and one of the the projects
- 21:36:43that I felt was really exciting. Our
- 21:36:46accounts receivable function was not
- 21:36:48doing well. There were a lot of manual
- 21:36:51steps and some of the steps were not
- 21:36:53working. So I was able to go ahead and
- 21:36:56work with some six sigma individuals and
- 21:36:58we revised the accounts receivable
- 21:37:01process and we were able to increase the
- 21:37:04overall effectiveness of the accounts
- 21:37:06receivable function by 20%. And we were
- 21:37:09able to reduce lost receivables by about
- 21:37:1210% as well. Our customers were happy,
- 21:37:16management was happy and it was a great
- 21:37:18experience for me to learn about six
- 21:37:20sigma working on that particular
- 21:37:22project.
- 21:37:24That's great.
- 21:37:26How would your past and current managers
- 21:37:28uh and colleagues describe you?
- 21:37:32>> You know, that's a difficult question,
- 21:37:33but I would hope that they would say
- 21:37:35that Robert is a hardworking individual.
- 21:37:39I'm very, very meticulous. As I shared
- 21:37:41before, I like everything to go ahead
- 21:37:43and be as correct as possible, but I'm
- 21:37:46also a caring individual as well. I
- 21:37:48enjoy working with the team, developing
- 21:37:51relationships, and I care about other
- 21:37:53people's perspectives, and as I
- 21:37:55mentioned earlier, I think I'm a pretty
- 21:37:57good time manager.
- 21:38:00>> Speaking of teams, do you prefer to work
- 21:38:02in teams or independently?
- 21:38:05>> You know, it's really situational. There
- 21:38:07are times in project management when you
- 21:38:09have to work individually. For example,
- 21:38:12if you're developing a budget or if
- 21:38:14you're developing a schedule or
- 21:38:16timeline, you really have to do it by
- 21:38:19yourself. In many cases, sitting in
- 21:38:20front of the computer using the tools.
- 21:38:22But on the other hand, when we're
- 21:38:24executing a project, I find that
- 21:38:26management by walking and talking,
- 21:38:28getting out, meeting with the people,
- 21:38:30having conversations with them is really
- 21:38:33exciting as well. So case by case
- 21:38:36situation, I I think I'm a pretty good
- 21:38:38team player, but I can also work alone
- 21:38:41if required.
- 21:38:43>> Good. Good. Where do you see yourself or
- 21:38:45hope to be in the next five years?
- 21:38:48>> I hope to continue working for the next
- 21:38:5010 to 15 years before I retire. And in
- 21:38:53five years, I'd love to be a part of
- 21:38:55your company hopefully in a higher level
- 21:38:59project management capability and
- 21:39:01capacity.
- 21:39:03Thank you. Well, let me end this
- 21:39:06interview by asking you one final
- 21:39:07question. Can you give me three reasons
- 21:39:10why we should hire you?
- 21:39:12>> Three reasons. Well, reason number one,
- 21:39:16I'm a very organized individual and I
- 21:39:19think organization is very very
- 21:39:21important for a project manager. I think
- 21:39:24I have a good understanding of project
- 21:39:26management frameworks both traditional
- 21:39:29project management frameworks and a
- 21:39:32little bit about agile and scrum through
- 21:39:34the training that I've received in the
- 21:39:36past and the actual experience I've had
- 21:39:38during the last two years as a project
- 21:39:41coordinator and I'm also a very very
- 21:39:43good team player as well. I don't mind
- 21:39:46being part of the team and if I have to
- 21:39:49take the lead periodically, I think I'm
- 21:39:51capable of doing a relatively good job
- 21:39:53in that area as well.
- 21:39:57>> Excellent. Well, thank you, Robert, for
- 21:39:59this time today. It's been great to meet
- 21:40:01with you. Um, as the next step, I'd like
- 21:40:04to schedule a technical interview with
- 21:40:06you. Uh, maybe later this week, if
- 21:40:08you're available, uh, for this
- 21:40:10interview, we would appreciate it if you
- 21:40:12could come to our location. It's not far
- 21:40:14from where you reside.
- 21:40:17>> Well, that sounds great, Leslie, and I
- 21:40:18really appreciate the opportunity. And
- 21:40:20yes, I did some research on the web, and
- 21:40:23your location is about 30 minutes by car
- 21:40:26from mine. It's an easy trip, and I'd
- 21:40:28love to be able to see where you work
- 21:40:31and meet you face to face. So, please
- 21:40:34let me know when it's convenient for you
- 21:40:36and I'll make myself available. And
- 21:40:37thank you again for your time.
- 21:40:40>> Wonderful. Thank you. Have a great one.
- 21:40:42You too there, Leslie. Thank you very
- 21:40:44much. Have a great rest of your day.
- 21:40:46>> You too. Bye-bye.
- 21:40:48>> Robert successfully passed his first
- 21:40:49round interview. Take a few moments to
- 21:40:52consider what answers helped Robert to
- 21:40:54get the second round, a technical
- 21:40:55interview. Then consider how you would
- 21:40:57answer the interviewer's questions.
- 21:41:00[Music]
- 21:41:10In this interview, Robert Mason has
- 21:41:12applied for an entry-level project
- 21:41:13manager role at ABC Company, a large
- 21:41:16electronics manufacturing company. The
- 21:41:18interviewer from ABC is Leslie Porter, a
- 21:41:21senior project manager. Please note,
- 21:41:23like in any interview, not all questions
- 21:41:25might be correct. Instead, focus on how
- 21:41:27the interviewe, Robert Mason, answered
- 21:41:29the questions. Robert made it to his
- 21:41:31second interview, the technical
- 21:41:32interview. Let's listen. Hi, Robert.
- 21:41:35It's so nice to see you again. I
- 21:41:38appreciate you being so flexible. I know
- 21:41:40we were going to meet face to face and
- 21:41:42it didn't work out. So, thanks for make
- 21:41:44making this Zoom call work out.
- 21:41:47>> Oh, no problem at all, Leslie. I
- 21:41:49appreciate the opportunity and hopefully
- 21:41:51in the future I'll be able to visit you
- 21:41:54at your location and see the wonderful
- 21:41:56work environment that I'm sure that you
- 21:41:59have. Uh I'm happy to go ahead and be
- 21:42:01here and you know one of the things that
- 21:42:03I noticed uh as I was reviewing the job
- 21:42:06description is that you require not only
- 21:42:11knowledge of traditional project
- 21:42:12management but a little bit of agile and
- 21:42:15scrum as well and that excites me
- 21:42:18because I do have a little bit of
- 21:42:19background in both which is kind of
- 21:42:21great.
- 21:42:22>> That's so great. I know you mentioned in
- 21:42:24your previous interview you took some
- 21:42:25continuing education courses. Do you
- 21:42:27have any other formal project management
- 21:42:29training?
- 21:42:31>> Uh yes, actually I took a continuing
- 21:42:33education course, but I also took a
- 21:42:36course for scrum master and I was able
- 21:42:40to go ahead and pass my certified scrum
- 21:42:42master certification.
- 21:42:44That doesn't mean that I know everything
- 21:42:46about scrum, but it certainly indicates
- 21:42:48that I have a good knowledge of the
- 21:42:50processes. And in addition, over the
- 21:42:52next couple of months, I've set a goal
- 21:42:54to achieve my CAPM certified associate
- 21:42:58and project management certification as
- 21:43:00well. And I'm pretty confident that I'll
- 21:43:02be able to pass that test and be able to
- 21:43:05add another certification to my overall
- 21:43:08list of skills.
- 21:43:10>> That's great, Robert. You are correct.
- 21:43:13We value those who are always looking to
- 21:43:15improve their skills and uh and
- 21:43:17qualifications as well. Um, we do
- 21:43:20require our project managers to be
- 21:43:22proficient in both traditional and agile
- 21:43:24methods. How would you determine if a
- 21:43:27project was suited for traditional or
- 21:43:29agile project management?
- 21:43:32>> Well, as a project coordinator, I was
- 21:43:34able to work with some really good
- 21:43:35product owner and scrum masters and
- 21:43:38learn from them. Uh, when it comes to
- 21:43:41making a project decision, as I recall,
- 21:43:44there were really two key
- 21:43:46considerations. One of them is the
- 21:43:49overall level of agreement. And what do
- 21:43:51I mean by that? When you work with the
- 21:43:54various stakeholders and talk with them,
- 21:43:57what is their vision in terms of what
- 21:43:59success looks like in terms of the
- 21:44:01requirements? If there's a lot of
- 21:44:03confusion or a lot of indecision, that
- 21:44:06would have a tendency to go ahead and
- 21:44:08drive you more toward agile and scrum.
- 21:44:11But if there's agreement that in six
- 21:44:13months what we need is not going to
- 21:44:15change, that would have a tendency to
- 21:44:17drive us a little bit more toward the
- 21:44:19traditional project management
- 21:44:21methodology. The second area is the
- 21:44:24level of complexity as well. If the
- 21:44:28level of complexity is low and it's not
- 21:44:31going to require an awful lot of
- 21:44:32innovation and creativity, that has a
- 21:44:35tendency to drive us more toward
- 21:44:37traditional project management. However,
- 21:44:40if there's a lot of innovation and
- 21:44:42complexity that is required, then that
- 21:44:45would have a tendency to go ahead and
- 21:44:47drive us a little bit more toward agile.
- 21:44:50And that's what I learned in my
- 21:44:51certified scrum master certification
- 21:44:54course as well. And I think it's a great
- 21:44:55methodology.
- 21:44:57>> That makes sense. Thank you. Uh, one of
- 21:45:00the biggest issues we face is scope
- 21:45:02creep. Um, how would you try to minimize
- 21:45:05scope creep in a project?
- 21:45:07Well, that's a great question and scope
- 21:45:10creep is a problem everywhere. As a
- 21:45:14project manager, I think it's very very
- 21:45:17important to be inclusive. And what do I
- 21:45:20mean by that? Normally, every
- 21:45:23organization has a project charter that
- 21:45:26defines what the requirements are.
- 21:45:29However, sometimes there's a gap between
- 21:45:31the time the project charter is approved
- 21:45:34to the time that the project is
- 21:45:36implemented as well. And to go ahead and
- 21:45:40fill that gap as you're planning, you
- 21:45:43really need to be inclusive and include
- 21:45:45the customers and the key stakeholders
- 21:45:48in the planning. Make sure that you
- 21:45:50validate what the requirement was and
- 21:45:53validate the fact that it still is a
- 21:45:56current requirement. And in addition, as
- 21:45:58you're planning, be open and upfront
- 21:46:01with your customers and stakeholders and
- 21:46:04let them know specifically what you're
- 21:46:06planning to go ahead and develop. The
- 21:46:09best time to go ahead and eliminate
- 21:46:11scope creep is during planning because
- 21:46:15during planning, it's easy to go ahead
- 21:46:17and update a plan. If you wait until
- 21:46:20after the plan is published and you did
- 21:46:23not really understand what the true
- 21:46:25requirements were, then there's going to
- 21:46:27be a lot of changes and then there's
- 21:46:29going to be the tendency for people to
- 21:46:31go ahead and add things that they're not
- 21:46:33supposed to add. So being inclusive
- 21:46:36during the planning process and realize
- 21:46:39that building change during planning is
- 21:46:42the best way to hopefully minimize scope
- 21:46:45creep, but it's difficult.
- 21:46:48Good. Yes. Effective collaboration and
- 21:46:51facilitation are two skills, you know,
- 21:46:54that are necessary to be successful in
- 21:46:56this position. Um, it sounds like you
- 21:46:59appreciate the value that those skills
- 21:47:00bring, but obviously we want to execute
- 21:47:03projects that provide value. However,
- 21:47:06schedules are absolutely critical. So
- 21:47:09many of our projects are time-sensitive
- 21:47:11and must be accomplished within the
- 21:47:13requirement time frames. How would you
- 21:47:15plan effective schedules and ensure that
- 21:47:18projects do not miss deadline?
- 21:47:20>> Well, again during the training that I
- 21:47:22attended for continuing education, it
- 21:47:25was shared that the number one reason
- 21:47:28why projects fail is because of
- 21:47:30unrealistic schedules. I learned about a
- 21:47:34work breakdown structure. And a work
- 21:47:36breakdown structure is essentially a
- 21:47:39list of activities and tasks that needs
- 21:47:41to be performed and it needs to be
- 21:47:44performed in a certain order.
- 21:47:48I am a firm believer in developing a
- 21:47:51network diagram which is just a fancy
- 21:47:53project management term that I'm sure
- 21:47:55you're familiar with Leslie for a
- 21:47:57schedule. The network diagram lists all
- 21:48:00of the different activities in the work
- 21:48:02breakdown structure in the order in
- 21:48:05which they're supposed to occur and it
- 21:48:07lists durations and it also lists
- 21:48:09dependencies as well. I try to develop a
- 21:48:13schedule that will accommodate
- 21:48:16everything that we have promised in the
- 21:48:18project charter. Now, sometimes that
- 21:48:22doesn't work out. And when it doesn't
- 21:48:24work out, we have to go back to the
- 21:48:26drawing board and do a little bit of
- 21:48:28negotiating and try to figure out where
- 21:48:30we can go ahead and add resources or
- 21:48:32possibly cut scope. But by using the
- 21:48:35work breakdown structure as our guide
- 21:48:37and making sure that this is tailored to
- 21:48:39the project and being transparent with
- 21:48:42the customers and letting them know
- 21:48:44exactly how long each task is going to
- 21:48:46take, I find that there's a whole lot
- 21:48:48more buy into the schedule and it gives
- 21:48:51us a greater chance of being successful.
- 21:48:56>> That's good. I I see you understand the
- 21:48:58six segma which is great. We do have
- 21:49:00processes and development pro and
- 21:49:02improvement projects here. Um but let me
- 21:49:05play devil's advocate here. Uh you
- 21:49:08developed this lovely network diagram
- 21:49:10but realized that the schedule that you
- 21:49:12might have proposed is not going to
- 21:49:14support the project requirements.
- 21:49:16>> Well you know that is a great question
- 21:49:19there Leslie. What I would do if this is
- 21:49:21the case is I would sit down with my
- 21:49:23sponsor and some of the key decision
- 21:49:25makers, those key stakeholders, and I
- 21:49:28would walk through the schedule and
- 21:49:30explain precisely what each particular
- 21:49:34activity is going to do, how long it's
- 21:49:37going to take, and why we created the
- 21:49:39schedule in the way that we did. If it
- 21:49:42turns out that we do not have enough
- 21:49:44time to accomplish everything, again,
- 21:49:47one of the things that I learned from
- 21:49:49some of my senior managers in my current
- 21:49:53job is that you have to balance the
- 21:49:55triangle. So, what do we mean by that?
- 21:49:58If we are not having enough time to
- 21:50:01complete the project with the schedule
- 21:50:04that we have created, we need to either
- 21:50:07get more resources or we need to go
- 21:50:10ahead and reduce the scope. And that has
- 21:50:13to be a decision that is made by the
- 21:50:15stakeholders and by the sponsor. And it
- 21:50:19was taught to me that this is called
- 21:50:21balancing the triangle. In the end,
- 21:50:24everybody has to agree with the
- 21:50:25schedule, the scope, and the budget. And
- 21:50:28sometimes that takes a little bit of
- 21:50:30time to go ahead and manage. It is not
- 21:50:33unusual, unfortunately, for you to
- 21:50:36require more time to satisfy everything
- 21:50:39in the project than you have. And
- 21:50:41sometimes you have to do that
- 21:50:42negotiation and you have to make those
- 21:50:44cuts or you have to make those
- 21:50:46compromises and concessions.
- 21:50:50>> Yes. How do how would you factor risk
- 21:50:52into your project planning?
- 21:50:55>> Well, when I took my
- 21:50:58continuing education course, I was very
- 21:51:00impressed by an acronym that I learned
- 21:51:03called Piercing. P IC.
- 21:51:07And every time I've had the opportunity
- 21:51:09to go ahead and plan risk for a project,
- 21:51:12I follow that. The P stands for plan.
- 21:51:16Develop a riskmanagement plan. Who's
- 21:51:19going to be on the risk team and how are
- 21:51:21you going to manage the end-to-end
- 21:51:23program? Secondly, identify risks.
- 21:51:26Identify as many as you can. The E
- 21:51:30stands for evaluation.
- 21:51:32Evaluate each risk in terms of the
- 21:51:36possibility or the potential that the
- 21:51:38risk will occur and the impact. And then
- 21:51:41the C stands for control. control the
- 21:51:45risk after you go ahead and develop the
- 21:51:48R which comes before the C uh which are
- 21:51:52responses. So plan it, identify the
- 21:51:55risks, evaluate the risks, develop
- 21:51:58responses and control it. And by
- 21:52:01following that PRC in my current job, we
- 21:52:04had an awful lot of success. And while
- 21:52:07sometimes we were caught by surprise by
- 21:52:09risks, for the most part, we managed it
- 21:52:11and it didn't manage us.
- 21:52:15Thank you. We are believers in the risk
- 21:52:17registers as well. One final question
- 21:52:20for you. We do not employ scrum masters
- 21:52:23or product owners. So we expect that our
- 21:52:26project managers can uh effectively
- 21:52:29serve in that role in agile projects. Is
- 21:52:32that something you would be able to do?
- 21:52:34And how would you do that?
- 21:52:37>> Well, that's a great question there
- 21:52:38Leslie. And actually in my current
- 21:52:40position, we really don't have product
- 21:52:42owners and scrum masters as well.
- 21:52:44Normally the project manager was the
- 21:52:47individual who was assigned to lead and
- 21:52:50manage the agile project. But I think
- 21:52:54that a project manager should be
- 21:52:56well-versed in both being a product
- 21:52:58owner and a scrum master. The product
- 21:53:00owner is the voice of the customer. And
- 21:53:03as a project manager, you have to be
- 21:53:05able to work with the customer,
- 21:53:07determine what their definition of value
- 21:53:10is, and hopefully effectively elicit
- 21:53:13requirements from them. But then the
- 21:53:16other job of the project manager is to
- 21:53:19manage the team as well. And that's the
- 21:53:21job of the scrum master. The scrum
- 21:53:23master makes sure that the team has
- 21:53:25everything that they need, that there
- 21:53:27are no blockers. So, I think that a
- 21:53:29project manager should be able to
- 21:53:31effectively perform both positions
- 21:53:34because that's really part of overall
- 21:53:36project management.
- 21:53:39>> Great. Most customers, as you know, want
- 21:53:43everything yesterday. So, how do you
- 21:53:45prioritize user stories in a product
- 21:53:48backlog?
- 21:53:50>> You know, that's a very important
- 21:53:51question as well. The number one
- 21:53:53priority is value. From the customer
- 21:53:57standpoint, we really have to understand
- 21:53:59which features and functions they value
- 21:54:02the most and we try to go ahead and
- 21:54:04prioritize those particular user stories
- 21:54:07highest in the product backlog. However,
- 21:54:11as the project manager, there are some
- 21:54:13dependencies that may not be a priority
- 21:54:17for the project
- 21:54:19sponsor or the project stakeholders, but
- 21:54:22need to be done first. For example,
- 21:54:25before I develop the new application,
- 21:54:27maybe I need to do some infrastructure
- 21:54:29work. So, it's very very important to be
- 21:54:32able to have that conversation with the
- 21:54:36stakeholders, with the customers and let
- 21:54:38them know the order in which each user
- 21:54:41story is going to occur and the reason
- 21:54:44why it's going to occur in that
- 21:54:46particular order as well. Again, try to
- 21:54:49focus on their value and give them what
- 21:54:52they need first, but within the
- 21:54:54guidelines of dependencies that need to
- 21:54:57happen along the way.
- 21:54:59>> That's great. Thanks so much, Robert.
- 21:55:02I've enjoyed hearing your thoughts. Uh,
- 21:55:04are you available to meet with me early
- 21:55:07next week uh for a final interview
- 21:55:09before we make our hiring decision?
- 21:55:12>> Uh, yes, Leslie. I'd be delighted to go
- 21:55:14ahead and do so, and I look forward to
- 21:55:16seeing you again. Again, I've enjoyed
- 21:55:19our conversation and just want to say
- 21:55:21thank you very much for your time and
- 21:55:24the great questions that you were able
- 21:55:25to go ahead and ask.
- 21:55:28>> Thank you. Perfect. I will send you a
- 21:55:30meeting proposal uh no later than
- 21:55:32tomorrow and uh I appreciate your
- 21:55:35flexibility. Thanks so much for chatting
- 21:55:37again today.
- 21:55:38>> Yes. Thank you, Leslie. I look forward
- 21:55:40to meeting you again next week to talk
- 21:55:42some more.
- 21:55:43>> Sounds great. Bye-bye.
- 21:55:45>> Have a great day. Bye-bye. Good job for
- 21:55:47Robert. He passed the technical
- 21:55:49interview and has a shot at the job if
- 21:55:51he has a strong final interview. What
- 21:55:54answers did Robert give that helped him
- 21:55:55secure the final interview? Think about
- 21:55:57how you would answer the same questions.
- 21:56:04[Music]
- 21:56:10Welcome to pre-in steps. After watching
- 21:56:13this video, you'll be able to describe
- 21:56:15guidelines to prepare for the final
- 21:56:17interview. Discuss how to prepare for
- 21:56:19behavioral questions in the final
- 21:56:20interview. The final interview is the
- 21:56:22last stretch between you and the
- 21:56:24decision on the job offer. Alexander
- 21:56:26Graham Bell once stated, "Before
- 21:56:28anything else, preparation is the key to
- 21:56:30success." This statement is very true
- 21:56:32when preparing for the final interview.
- 21:56:34Preparing for the final interview will
- 21:56:35take more time than the actual interview
- 21:56:37itself. However, this time is well spent
- 21:56:40and will improve your overall chances of
- 21:56:42success. Let's examine some guidelines
- 21:56:44that will prepare you to impress and
- 21:56:46succeed in the final interview. Be well
- 21:56:49rested the day before the interview.
- 21:56:51Understand the company's mission,
- 21:56:52vision, and goals. This research will
- 21:56:55help showcase how your values and goals
- 21:56:57align with the companies. Also, research
- 21:56:59the interviewers beforehand and try to
- 21:57:01learn as much about them as possible.
- 21:57:03Social media websites such as LinkedIn
- 21:57:05are a great resource. If you have
- 21:57:07questions or need clarification before
- 21:57:09the interview, ask immediately. Don't
- 21:57:10assume. Prepare your value proposition,
- 21:57:13the quantifiable data you will share
- 21:57:15during the interview, and the questions
- 21:57:16you will ask. Get the logistics in
- 21:57:18place. For example, your attire,
- 21:57:20internet connectivity, travel schedule,
- 21:57:22stationery, certificates, and photos.
- 21:57:25With the technical skills assessed in
- 21:57:27the previous interview rounds, the final
- 21:57:29interview might pose some behavioral
- 21:57:31questions. Again, depending on the
- 21:57:33company, you might encounter behavioral
- 21:57:35questions throughout the interview
- 21:57:36process. How do you prepare for
- 21:57:38behavioral questions? First and
- 21:57:40foremost, be aware of the questions that
- 21:57:42the interviewer might ask. Let's review
- 21:57:44some common questions and how to prepare
- 21:57:46to respond. First, a common question is,
- 21:57:48how do you set goals? To respond to this
- 21:57:50question, it will benefit you to
- 21:57:52research goal setting best practices.
- 21:57:54Also, be aware of smart goals, which are
- 21:57:56specific, measurable, attainable,
- 21:57:58relevant, and time bound. Now another
- 21:58:01question. Can you work effectively under
- 21:58:03pressure? Answer this question honestly.
- 21:58:05Acknowledge that working under pressure
- 21:58:07is not easy. However, you can always
- 21:58:09state that pressure is an opportunity
- 21:58:11that drives you to deliver your best and
- 21:58:13develop timely solutions. Another
- 21:58:15interesting behavioral question is how
- 21:58:17do you handle a challenge? You can share
- 21:58:19how you can stay calm and focused.
- 21:58:21Mention that you take a systematic
- 21:58:22approach, which includes identifying the
- 21:58:24root cause of the problem, developing
- 21:58:26potential solutions, analyzing options,
- 21:58:29and taking action. Share how a
- 21:58:30collaborative approach often yields the
- 21:58:32best results. When responding to the
- 21:58:34question, "Can you tell us about an
- 21:58:36unanticipated challenge you faced?"
- 21:58:38Build on the process you shared to
- 21:58:39handle a challenge. Be ready with a
- 21:58:41story that you can use as a case study.
- 21:58:43A frequently asked question is, "Can you
- 21:58:45describe a time you handled a stressful
- 21:58:47situation successfully?" Respond by
- 21:58:49sharing a personal story on how you
- 21:58:51handled a stressful situation. Focus on
- 21:58:53the skills you use to overcome this
- 21:58:55stressful situation and achieve success.
- 21:58:57Common skills you can reference include
- 21:58:59company, time management, the ability to
- 21:59:01prioritize, and attention to detail. If
- 21:59:04the interviewer asks you, "Can you tell
- 21:59:06me about a complex problem you solved at
- 21:59:08work?" One way to respond is to show how
- 21:59:10you used practical root cause analysis
- 21:59:13to address a project that went off track
- 21:59:15or a process that was not efficient.
- 21:59:17Project managers should understand how
- 21:59:18to facilitate a root cause analysis. Use
- 21:59:21your response to highlight your
- 21:59:22understanding and ability to apply the
- 21:59:24methodology to achieve a favorable
- 21:59:26resolution. Here's a common question.
- 21:59:28When did you make a mistake last and how
- 21:59:30did you handle it? Don't hesitate.
- 21:59:32Respond with sincerity. Outline your
- 21:59:34mistake, but don't dwell on it. Above
- 21:59:36all, don't place blame on others. Take
- 21:59:39accountability. Describe the actions or
- 21:59:41steps you took and the positive results.
- 21:59:44Finally, one of the most common
- 21:59:45questions is, "How did you learn from a
- 21:59:47mistake you made?" When responding,
- 21:59:49emphasize that everyone makes mistakes.
- 21:59:51Mistakes are a part of taking risks to
- 21:59:53achieve rewards. However, stress that
- 21:59:55the key is looking at the mistake as a
- 21:59:57learning opportunity to improve
- 21:59:59performance. When responding to the
- 22:00:01questions, use real life scenarios. Be
- 22:00:03honest. These mentioned questions are a
- 22:00:06sample of common challenging interview
- 22:00:07questions. You might receive questions
- 22:00:09on your leadership and management
- 22:00:11skills, how to form and motivate teams,
- 22:00:13and so on. To ensure your responses are
- 22:00:16effective, you must prepare ahead,
- 22:00:18develop and practice responses to common
- 22:00:20behavioral questions. If possible,
- 22:00:23practice in front of a mirror. Record
- 22:00:25your responses on a smartphone and play
- 22:00:27them back. Ask your peers and friends to
- 22:00:29evaluate your responses. In this video,
- 22:00:31you learned that key aspects of
- 22:00:33preparing for the final interview
- 22:00:35include be well-rested, research the
- 22:00:38interviewers, understand the company's
- 22:00:40mission, vision, and goals, prepare your
- 22:00:43value proposition, quantifiable data
- 22:00:45questions, be prepared with the
- 22:00:47logistics, be aware of the common
- 22:00:49interview questions. Some common
- 22:00:51interview questions include, how do you
- 22:00:53set goals? Can you work effectively
- 22:00:55under pressure? How do you handle a
- 22:00:57challenge? Can you tell us about an
- 22:00:59unanticipated challenge you faced? Can
- 22:01:01you describe a time you handled a
- 22:01:03stressful situation successfully? Could
- 22:01:05you tell me about a complex problem you
- 22:01:07solved at work? When was the last time
- 22:01:09you made a mistake and how did you
- 22:01:10handle it? How did you learn from a
- 22:01:12mistake you made? When responding to the
- 22:01:14questions, use real life scenarios. Keep
- 22:01:16it real. Be honest.
- 22:01:23[Music]
- 22:01:31What tips can you provide to
- 22:01:32successfully prepare for an interview?
- 22:01:34What are some dos and don'ts?
- 22:01:36>> So, I think a lot of that um preparation
- 22:01:38is about understanding the role that
- 22:01:40you're looking for and how that role
- 22:01:42fits into the overall company's mindset
- 22:01:45and goals. Um the other aspect is to
- 22:01:48really know your resume. And what I mean
- 22:01:50by that is when you're creating a
- 22:01:52resume, you might just list your past
- 22:01:54skills, but you haven't really thought
- 22:01:56through, okay, what are these skills and
- 22:01:58in what ways did I apply them? And can I
- 22:02:00call out specific anecdotal scenarios
- 22:02:03where I had to apply these specific
- 22:02:05roles to this job? So really thinking
- 22:02:07through your resume and having at the
- 22:02:10ready um stories that you can tell and
- 22:02:13examples that you can give um to really
- 22:02:16illustrate the skills that you've listed
- 22:02:17in your resume. That's um absolutely
- 22:02:19critical when you're interviewing. I
- 22:02:22think um there's there's always things
- 22:02:23that you want to make sure that you're
- 22:02:25you're accomplishing and probably some
- 22:02:28things to avoid um on the things you
- 22:02:30want to accomplish.
- 22:02:32>> Well, the best tip that I can give you
- 22:02:34is truly understand the company before
- 22:02:38you go to the interview. Go to the
- 22:02:40company website. Know what they do. Know
- 22:02:42who they are. Understand their mission.
- 22:02:45Understand their vision. And if
- 22:02:47possible, try to understand a little bit
- 22:02:49about their culture and values as well.
- 22:02:52Secondly, truly understand the position
- 22:02:55that you are interviewing for and what
- 22:02:58is required. And if they hire you,
- 22:03:01you're going to be able to provide
- 22:03:03value. Prepare for questions. There are
- 22:03:06basically three types of questions.
- 22:03:09general questions that you normally
- 22:03:11receive at a preliminary interview such
- 22:03:13as an HR screening or a first stage
- 22:03:15interview, behavioral questions which
- 22:03:18can be very very challenging as well.
- 22:03:21This is something that you really want
- 22:03:23to practice. For example, how would you
- 22:03:26handle a conflict with a sponsor? That
- 22:03:29can be a very challenging question. And
- 22:03:32in addition, technical questions. This
- 22:03:34is project management. I can almost
- 22:03:37promise you a question you're going to
- 22:03:38receive is, "Your firm is experiencing
- 22:03:42an awful lot of scope creep for their
- 22:03:44projects. How would you go ahead and
- 22:03:47prevent that?"
- 22:03:49Think about the questions that you may
- 22:03:50be asked and practice the appropriate
- 22:03:52question for the type of interview that
- 22:03:54you're having. And last, but certainly
- 22:03:56not least, dress appropriately as well.
- 22:04:01>> What are some dos and don'ts?
- 22:04:04So, I've been interviewing and have
- 22:04:06interviewed a ton of times, and when I
- 22:04:09go in for a first round interview, I
- 22:04:11still get nervous. So, one of the tips
- 22:04:14for overcoming that is is really just to
- 22:04:17practice and prepare. So, you don't want
- 22:04:19to go into the interview sounding like
- 22:04:21you're reading off a script, but talking
- 22:04:24with a friend or a family member and
- 22:04:27having them ask you some questions that
- 22:04:29the interviewer might ask you. and
- 22:04:32thinking through what your response
- 22:04:34would be and actually giving that
- 22:04:36response and practicing that response
- 22:04:38can be really helpful to overcome that
- 22:04:40nervousness. Another challenge is
- 22:04:42overcoming like unexpected questions. So
- 22:04:46sometimes you'll get a question that
- 22:04:48just really throws you off and that
- 22:04:51combined with some of the nervousness
- 22:04:53can really be challenging in that
- 22:04:55situation. So my advice would be just to
- 22:04:58stay calm, breathe. The interviewer
- 22:05:01isn't going to fault you for taking a
- 22:05:04moment to think about your answer. In
- 22:05:06fact, a lot of interviewers and hiring
- 22:05:09managers will actually prefer someone
- 22:05:12who gets a really challenging question
- 22:05:15and take some time to think about the
- 22:05:17answer to that question instead of just
- 22:05:19starting to give an answer that they
- 22:05:22haven't thought about. So stay calm,
- 22:05:25take a deep breath, think a for a few
- 22:05:28moments about the answer to that
- 22:05:29question, and then respond. And if you
- 22:05:32really don't have an answer, or if it's
- 22:05:34a question that you can't answer, it's
- 22:05:37always okay to in a tactful way say, I
- 22:05:40don't have an answer to that question,
- 22:05:42or can you clarify the question because
- 22:05:45I'm really not sure what you're asking.
- 22:05:47So there's ways that you can navigate
- 22:05:49even if you don't end up coming up with
- 22:05:51an answer. Um but the biggest thing is
- 22:05:54to just stay calm.
- 22:05:56>> So one of the things that I've seen um
- 22:06:00employees do as they really try to gear
- 22:06:03up for an important interview is, you
- 22:06:06know, rehearsing the interview is really
- 22:06:09important. You want to rehearse, but you
- 22:06:11don't want to rehearse to the point
- 22:06:12where you're memorizing your answers. If
- 22:06:14you're actually
- 22:06:16regurgitating or just giving a speech
- 22:06:19based on some information that you've
- 22:06:21memorized, that's going to come across
- 22:06:23and it's not going to reflect well on
- 22:06:25you. You want to have rehearsed, but you
- 22:06:28want to have rehearsed enough so that
- 22:06:29your answers come across fluidly and
- 22:06:32sincerely um and not something that
- 22:06:36you're just reciting. Um that might seem
- 22:06:38like a simple step, but it's one that
- 22:06:42I've seen a lot of people make mistakes
- 22:06:43with. So, don't recite your answers that
- 22:06:46are memorized during an interview.
- 22:06:49[Music]
- 22:07:00Welcome to attending the interview.
- 22:07:02After watching this video, you'll be
- 22:07:04able to list the topics to improve your
- 22:07:07chances of success, summarize confidence
- 22:07:10considerations, explain how to use
- 22:07:12breaks to your advantage. Attending an
- 22:07:15interview can be stressful. However, it
- 22:07:17is important that you leave a positive
- 22:07:19impression from when you enter the
- 22:07:20office or log into the virtual meeting
- 22:07:23to when your interview or meeting
- 22:07:24concludes.
- 22:07:26It is said that first impressions are
- 22:07:28lasting. You have one opportunity to
- 22:07:30make a positive first impression. Let's
- 22:07:33review some tips to improve your chances
- 22:07:35of success. Be on time. Punctuality
- 22:07:39shows that you were disciplined and have
- 22:07:40a respect for the interviewer's time. If
- 22:07:43you're running late, call ahead. Do not
- 22:07:45arrive late and share an excuse. Dress
- 22:07:48for success. Try to determine the dress
- 22:07:50norms for your interview ahead of time.
- 22:07:52Do not dress down or do not overdress.
- 22:07:56When in doubt, business casual with a
- 22:07:58jacket works well for all genders. It
- 22:08:00may be beneficial to have a necktie
- 22:08:02available just in case. Bring the
- 22:08:05essentials to an interview. Avoid
- 22:08:06bringing in coffee, snacks, chewing gum,
- 22:08:09and so on. If you need water, bring a
- 22:08:11small bottle in your bag. Be polite to
- 22:08:14the receptionist and thank them for
- 22:08:15their time. Some firms ask the
- 22:08:17receptionist for their impressions of
- 22:08:19you as a part of their checklist. The
- 22:08:21receptionist may also be a great source
- 22:08:23of information. For example, ask the
- 22:08:25receptionist, "Do you think I need a
- 22:08:26necktie?"
- 22:08:28Your smartphone is not required. Put
- 22:08:30your smartphone in your pocket or bag
- 22:08:32and turn it off. Your interviewer's
- 22:08:34first impression of you should not be
- 22:08:35one where they picture you engaged with
- 22:08:37your smartphone.
- 22:08:38Be organized. At a minimum, have copies
- 22:08:41of your resume, a notebook, business
- 22:08:43cards, and a pen. Pack the minimum and
- 22:08:45be able to locate what you need in a
- 22:08:47matter of seconds. You may consider
- 22:08:49color-coded folders or an organizer for
- 22:08:51each document that you require.
- 22:08:54Make the first move. Greet your
- 22:08:55interviewer with a handshake and a
- 22:08:57smile. This action shows the interviewer
- 22:08:59that you are ready, confident, and self
- 22:09:01assured. Make a connection. Try to find
- 22:09:04something you and the interviewer have
- 22:09:06in common. Be observant. If you know
- 22:09:09your interviewer, perform some initial
- 22:09:11research. Social media can be helpful.
- 22:09:14And find something you have in common.
- 22:09:16For example, you notice a college
- 22:09:18diploma from a university you attended.
- 22:09:20comments on the fact that you both
- 22:09:21attended the university. This small
- 22:09:24icebreaker can lead to positive results.
- 22:09:26Employers are seeking individuals who
- 22:09:28have a solid confidence level and are
- 22:09:30self assured. Here are some ways that
- 22:09:32you show your confidence during the
- 22:09:33interview. Greeting. Practice your
- 22:09:36initial hello and handshake. Determine
- 22:09:38if the culture dictates an alternate
- 22:09:40greeting and be ready to adapt. For
- 22:09:42example, many Asian executives may bow
- 22:09:45slightly during the initial
- 22:09:46introduction.
- 22:09:48Body language. Practice making eye
- 22:09:50contact and displaying good posture.
- 22:09:52Stay focused. Avoid folding your arms
- 22:09:55and fidgeting. Show you are alert and
- 22:09:57engaged. Breathing. Practice good
- 22:10:00breathing techniques. Practicing slow,
- 22:10:02deep breathing can help you maintain
- 22:10:04focus, collect your thoughts, and
- 22:10:06refocus if necessary. Prepare and
- 22:10:09rehearse. Be prepared to respond
- 22:10:11thoughtfully. Respond thoughtfully. Take
- 22:10:14your time when responding to questions.
- 22:10:16Use pauses and try to speak slowly.
- 22:10:19Address each question thoroughly. It is
- 22:10:22not off limits to say, "That's a good
- 22:10:23question. Let me think about that for a
- 22:10:25moment." Check your emotions. Show
- 22:10:28passion, but check your feelings at the
- 22:10:30door. Remain calm and positive. And
- 22:10:32always remember that your smile is a
- 22:10:33tool that can pave the way for improved
- 22:10:35relationships and win over an
- 22:10:37interviewer. Some interviews are
- 22:10:39timeconuming. For interviewers exceeding
- 22:10:4130 minutes or more, asking for a drink
- 22:10:44of water or a restroom break is
- 22:10:45acceptable. If you need one, limit the
- 22:10:47break to a few minutes and thank the
- 22:10:49interviewer for their consideration. If
- 22:10:51the interviewer offers a break, take it.
- 22:10:53Breaks are an opportunity to gather your
- 22:10:55thoughts, take a deep breath, and calm
- 22:10:57your nerves. You can also use this time
- 22:10:59to review your notes, drink some water,
- 22:11:01or use the restroom. In this video, you
- 22:11:04learned that you can use some of the
- 22:11:06following tips to make a good first
- 22:11:08impression. Be on time. Dress for
- 22:11:11success. Bring the essentials to the
- 22:11:13interview. Be polite, silence your
- 22:11:16mobile device, be organized, make the
- 22:11:19first move, and make a connection. Some
- 22:11:22ways to show confidence during an
- 22:11:24interview include greeting, body
- 22:11:26language, breathing, prepare and
- 22:11:29rehearse, respond thoughtfully, and
- 22:11:32check emotions. If you need a break,
- 22:11:34don't hesitate to ask for a short one.
- 22:11:42[Music]
- 22:11:48Welcome to answering questions. After
- 22:11:51watching this video, you'll be able to
- 22:11:53describe how to answer questions,
- 22:11:55discuss questions you should avoid, and
- 22:11:57explain the STAR technique. Answering
- 22:11:59questions properly and adequately is
- 22:12:01critical to your success in an
- 22:12:02interview. Here are some tips on
- 22:12:04answering interview questions. Prepare
- 22:12:07for the interview. Anticipate the
- 22:12:09questions you are likely to receive and
- 22:12:11prepare and rehearse your responses
- 22:12:12ahead of time. In particular, consider
- 22:12:15the tough questions you might receive.
- 22:12:17Practice answering these questions
- 22:12:18before the interview. Share your
- 22:12:21proposed responses with trusted friends
- 22:12:22and mentors. Solicit their feedback and
- 22:12:25have your answers well thought out
- 22:12:26before they are asked.
- 22:12:29Think before you speak. Do not rush your
- 22:12:31answer. Pause a moment to ensure you are
- 22:12:34able to understand the question and
- 22:12:35mentally review your response. Take a
- 22:12:37deep breath. If need be, state, "That is
- 22:12:40a great question. Let me think about it
- 22:12:42for a moment." That gives you a few
- 22:12:44seconds to gather your thoughts. If need
- 22:12:47be, ask for additional time to respond.
- 22:12:50Using responses such as, "Can we get
- 22:12:52back to that question in a bit?" or "Can
- 22:12:54I do some research on this and get back
- 22:12:55to you?" are better responses than
- 22:12:57responding poorly. You may want to
- 22:12:59answer a portion of the question. You
- 22:13:01may respond, "I can answer this question
- 22:13:03in part. Promise to get back to the
- 22:13:06interviewer on the parts of the question
- 22:13:07you defer. Monitor your body language.
- 22:13:10It is said that your non-verbal
- 22:13:12communications are more often revealing
- 22:13:14than the words you share. Stay focused.
- 22:13:16Make eye contact. Nod. Don't fidget.
- 22:13:19Uncross your arms and take notes. Don't
- 22:13:21forget your smile.
- 22:13:23Reword or paraphrase. Clarify the
- 22:13:26question. Consider rewarding or
- 22:13:28paraphrasing the question to ensure your
- 22:13:30response is adequate. Respond with, in
- 22:13:32other words, or if I understand your
- 22:13:35question. Make sure you clarify any
- 22:13:37acronyms or ambiguous terms. Do not
- 22:13:40assume you understand their meaning.
- 22:13:41Confirm it. Use the question as a bridge
- 22:13:44opportunity. Answer the question, then
- 22:13:46draw a link to a topic you might prefer
- 22:13:48to discuss that is more comfortable for
- 22:13:50you. Find ways to share your key selling
- 22:13:52points in the interview, even if a
- 22:13:54specific question is not asked.
- 22:13:57Manage your demeanor. Always remain
- 22:13:59respectful and courteous. Do not let
- 22:14:01your emotions take the lead. Try to
- 22:14:03connect with the interviewer and
- 22:14:05consider using humor when it makes
- 22:14:06sense. Disengage when necessary. Let the
- 22:14:10interviewer know you finished a response
- 22:14:11and are ready to move on to the next
- 22:14:13question. Next, let's look at questions
- 22:14:16you should avoid asking. You have little
- 22:14:18control over the questions asked of you.
- 22:14:20However, you have control over the
- 22:14:22questions you can ask. If asked what you
- 22:14:24consider as an inappropriate question,
- 22:14:26respond as nothing in my personal life
- 22:14:29that would stop me from being 100%
- 22:14:31committed to this position or who I am
- 22:14:34personally will never interfere with my
- 22:14:36desire to work hard and excel in the
- 22:14:37job. Here are topics around which any
- 22:14:40questions will be considered
- 22:14:41inappropriate.
- 22:14:43Age, ancestry, race, citizenship, credit
- 22:14:46rating, criminal record, disabilities,
- 22:14:48family status, gender, military
- 22:14:50discharge, or sexual preference.
- 22:14:53children, pregnancy or child care
- 22:14:55arrangements, height, weight or
- 22:14:58appearance, recreational drug use or
- 22:15:00sick leave history,
- 22:15:03preferences for a certain type of
- 22:15:04candidate, and politics or religion.
- 22:15:08Now, let's review the STAR technique, a
- 22:15:10common method used to prepare for
- 22:15:12behavioral and situational interview
- 22:15:14questions. STAR stands for situation,
- 22:15:17task, action, and result. You can use
- 22:15:20the STAR technique if a hiring manager
- 22:15:22or interviewer asks behavioral interview
- 22:15:24questions to determine your fit for the
- 22:15:26position. This method helps you prepare
- 22:15:28clear and concise responses using real
- 22:15:30life examples. Let's define the STAR
- 22:15:33categories. Situation. Describe the
- 22:15:36situation and when it took place. Task.
- 22:15:40Explain the task and what was the goal.
- 22:15:43Action. Provide details about the action
- 22:15:45you took to attain this result. Conclude
- 22:15:49with the result of your action.
- 22:15:51Let's illustrate an example. You were
- 22:15:53asked how do you normally approach
- 22:15:55problems? Can you share your process?
- 22:15:58You can share the process the narrative
- 22:16:00for which might be I took a process
- 22:16:03approach. I reviewed schedules,
- 22:16:04identified the problem and searched for
- 22:16:06the root causes. I then collaborated
- 22:16:09with the team to identify the true root
- 22:16:11causes for delays.
- 22:16:13We developed solutions to fasttrack some
- 22:16:15activities and crash others using
- 22:16:17available resources. When using the STAR
- 22:16:19technique, remember you can use examples
- 22:16:22from work, home, or volunteering.
- 22:16:24Remember the KISS acronym. Keep it short
- 22:16:27and sweet. Respond in a conversational
- 22:16:29manner. Try not to appear too rehearsed.
- 22:16:32Be prepared to answer follow-up
- 22:16:34questions. Your examples will likely
- 22:16:35generate interest and additional
- 22:16:37questions. In this video, you learned
- 22:16:39that preparation, thinking before
- 22:16:41responding, monitoring your body
- 22:16:43language, rewarding or rephrasing, and
- 22:16:45managing your demeanor are important to
- 22:16:47be successful in an interview. Avoid any
- 22:16:50questions or comments around personal
- 22:16:52life.
- 22:16:54Use the STAR technique to structure your
- 22:16:56response for a behavioral question. The
- 22:16:58STAR categories include situation,
- 22:17:01describe the situation and when it took
- 22:17:03place, task, explain the task and what
- 22:17:06was the goal.
- 22:17:08Action. Provide details about the action
- 22:17:10you took to attain this result. Conclude
- 22:17:13with a result of your action.
- 22:17:19[Music]
- 22:17:25Welcome to Expert Viewpoints, responding
- 22:17:27to questions. In this video, get tips
- 22:17:30from experts for how to successfully
- 22:17:32prepare for interview questions.
- 22:17:35What have you found to be the best ways
- 22:17:37to prepare for questions?
- 22:17:40>> There are normally three categories of
- 22:17:42questions. General questions, tell us
- 22:17:45about yourself. General questions, h why
- 22:17:49are you here? General questions, what
- 22:17:52are your basic skills? How do you match
- 22:17:55to this particular position? Next, there
- 22:17:58are technical questions. This normally
- 22:18:01occurs during a technical interview that
- 22:18:03follows a first stage interview.
- 22:18:05Definitely understand key questions that
- 22:18:08are going to be asked about project
- 22:18:10management. And as a project manager,
- 22:18:12all of you are familiar with the
- 22:18:14triangle, time, cost, and scope.
- 22:18:18Definitely understand the process to
- 22:18:20develop a scope baseline, understand the
- 22:18:22process to develop a schedule baseline,
- 22:18:25and understand the process to develop a
- 22:18:27cost baseline because chances are pretty
- 22:18:29good your technical questions will go
- 22:18:31ahead and address those particular areas
- 22:18:34as well. And write down your questions
- 22:18:38and practice them. As a matter of fact,
- 22:18:41if you think that there are certain
- 22:18:42questions, there is no problem with
- 22:18:45carrying your notebook and having
- 22:18:47certain questions with bullet points
- 22:18:48available. An interviewer is not going
- 22:18:51to penalize you if you say, "Well, give
- 22:18:54could I have a moment to think about
- 22:18:55that. That's really a great question."
- 22:18:58And I think I have a little note on this
- 22:19:00and just do a glance, but don't read it.
- 22:19:02Then look back and share your response.
- 22:19:07I think the best way to prepare for
- 22:19:08questions is to video yourself. Uh find
- 22:19:11somebody who can ask you questions just
- 22:19:13like what we're doing here in these
- 22:19:15videos. Um and prepare your, you know,
- 22:19:18you research the questions, you give
- 22:19:20them to your buddy, and then get the
- 22:19:22video out and start recording yourself
- 22:19:24and prep. See how you look. See, you
- 22:19:26know, you could even go so far as do I
- 22:19:28want to wear this color or that color
- 22:19:30and put my hair up or down or whatever.
- 22:19:32But um but look at what your face looks
- 22:19:34like. look at your facial expressions as
- 22:19:37you're answering the questions. Um, you
- 22:19:39know, have your have your friend be a
- 22:19:43little bit different than what you're
- 22:19:44expecting. You know, have them mix it
- 22:19:46up. Not all interviews are easy. Some
- 22:19:49people intentionally try to make people
- 22:19:50nervous during interviews. Um, they
- 22:19:53might really get in your face with
- 22:19:54questions or really dive in to like take
- 22:19:57one situation and just keep drilling and
- 22:19:59drilling and drilling on it. And so, you
- 22:20:01know, if you can have your buddy try
- 22:20:03different styles of questions, that
- 22:20:05would be great, too, so that you're
- 22:20:07prepared to answer any any type of of
- 22:20:09conversation that you need to.
- 22:20:14>> What have you found to be the best ways
- 22:20:16to prepare for questions?
- 22:20:18>> Um, a lot of the interview prep
- 22:20:20questions do feel like an exam, and you
- 22:20:22don't want to have that mindset going
- 22:20:23into an interview. You want to go into
- 22:20:25the interview with a mindset of of
- 22:20:27conversing with the hiring manager. So
- 22:20:29to prepare for interview questions, talk
- 22:20:32with people and have them interview you
- 22:20:34and then that will help you understand
- 22:20:36what that conversation will be like. And
- 22:20:39I think we'll much better prepare you
- 22:20:40than just looking at a list of questions
- 22:20:42online.
- 22:20:44The way that I prepare for interview
- 22:20:46questions is to um is to try to talk to
- 22:20:49people in the industry that are working
- 22:20:51in that field. Um, a lot of times in the
- 22:20:54interviews that I've gone in, I I've not
- 22:20:56only talked to hiring managers, but I've
- 22:20:58talked to specialists within the group
- 22:21:00that will be hiring me. So, for example,
- 22:21:01when I was working at Microsoft and got
- 22:21:04hired into the role there, I talked to
- 22:21:06seven or eight different people. Um, I
- 22:21:08was being hired for a very specific
- 22:21:10role, but I talked to people from
- 22:21:11marketing, I talked to people from the
- 22:21:13testing organization, from the software
- 22:21:15development organization, um, and the
- 22:21:17project management organization. And so
- 22:21:20trying to to prepare for all of those
- 22:21:23questions can be very difficult. But
- 22:21:26when I was trying to get my head around
- 22:21:28what I needed to say in the interview, I
- 22:21:30actually talked to different people that
- 22:21:32were working in those roles to try to
- 22:21:34understand what they cared about, what
- 22:21:35what their needs were, what their, you
- 22:21:37know, values were. And these were people
- 22:21:39that I knew from um from my personal
- 22:21:41life and from other work that I had
- 22:21:43done. And by talking to those people, I
- 22:21:45felt like I was getting a good picture
- 22:21:46of what each of the roles might be
- 22:21:49interested in and I was able to kind of
- 22:21:51prepare for interview questions that
- 22:21:52way. Um, I did look online at interview
- 22:21:55questions, but I I rarely find those
- 22:21:57valuable. So, talking to people that are
- 22:22:00actually doing the roles and getting
- 22:22:01them to ask you questions is the best
- 22:22:03way that you can prepare for those.
- 22:22:05So, I've been interviewing and have
- 22:22:08interviewed a ton of times and when I go
- 22:22:10in for a first round interview, I still
- 22:22:13get nervous. So, one of the tips for
- 22:22:16overcoming that is is really just to
- 22:22:18practice and prepare. So, you don't want
- 22:22:21to go into the interview sounding like
- 22:22:22you're reading off a script, but talking
- 22:22:26with a friend or a family member and
- 22:22:28having them ask you some questions that
- 22:22:31the interviewer might ask you and
- 22:22:34thinking through what your response
- 22:22:36would be and actually giving that
- 22:22:37response and practicing that response
- 22:22:39can be really helpful to overcome that
- 22:22:42nervousness. Um, and then another
- 22:22:45challenge is overcoming like unexpected
- 22:22:48questions. So sometimes you'll get a
- 22:22:50question that just really throws you off
- 22:22:53and that combined with some of the
- 22:22:55nervousness can really be challenging in
- 22:22:58that situation. So my advice would be
- 22:23:01just to stay calm, breathe. The
- 22:23:04interviewer isn't going to fault you for
- 22:23:06taking a moment to think about your
- 22:23:08answer. In fact, a lot of interviewers
- 22:23:11and hiring managers will actually prefer
- 22:23:14someone who gets a really challenging
- 22:23:17question and take some time to think
- 22:23:20about the answer to that question
- 22:23:22instead of just starting to give an
- 22:23:25answer that they haven't thought about.
- 22:23:27So stay calm, take a deep breath, think
- 22:23:30a for a few moments about the answer to
- 22:23:32that question, and then respond. And if
- 22:23:35you really don't have an answer or if
- 22:23:37it's a question that you can't answer,
- 22:23:39it's always okay to in a tactful way
- 22:23:42say, "I don't have an answer to that
- 22:23:45question or can you clarify the question
- 22:23:48because I'm really not sure what you're
- 22:23:49asking." So, there's ways that you can
- 22:23:51navigate even if you don't end up coming
- 22:23:54up with an answer. Um, but the biggest
- 22:23:56thing is to just stay calm.
- 22:23:58[Music]
- 22:24:09Next, check out Robert's third and final
- 22:24:11interview.
- 22:24:13In this interview, Robert Mason has
- 22:24:14applied for an entry-level project
- 22:24:16manager role at ABC Company, a large
- 22:24:18electronics manufacturing company. The
- 22:24:21interviewer from ABC is Leslie Porter, a
- 22:24:23senior project manager. Please note,
- 22:24:25like in any interview, not all questions
- 22:24:27might be correct. Instead, focus on how
- 22:24:29the interviewee, Robert Mason, answered
- 22:24:31the questions.
- 22:24:33>> Hello, Robert. Welcome back. I've hope
- 22:24:36that you had a great week so far. Let me
- 22:24:38cut to the chase. ABC Company is a great
- 22:24:42place to work. Uh, however, this project
- 22:24:44management position will require some
- 22:24:46potential challenges. Um, I want to
- 22:24:49present you with some of these
- 22:24:50challenges and get your thoughts on how
- 22:24:52you would address these.
- 22:24:54>> Wonderful. Well, thank you again for
- 22:24:56your time there, Leslie. And it is nice
- 22:24:58to see you again and hopefully you as
- 22:25:00well had a great week and I look forward
- 22:25:03to go uh to to your questions here. I'm
- 22:25:06sure they're going to be challenging and
- 22:25:08I'll do the very best that I can to go
- 22:25:10ahead and respond.
- 22:25:11>> Great. Uh you'll need to make decisions
- 22:25:14quickly. So, how do you make decisions
- 22:25:17and try to avoid possible conflict uh
- 22:25:20that may result from them?
- 22:25:23Decision making is always a huge
- 22:25:25interpersonal skill challenge. Uh as I
- 22:25:28shared earlier, I spent a lot of time in
- 22:25:31marketing. We had to make a lot of
- 22:25:33decisions. And now for the past couple
- 22:25:35of years as a project coordinator.
- 22:25:37Decisions are an everyday dilemma that
- 22:25:40we have to go ahead and face. So one of
- 22:25:42the things that I found that is really
- 22:25:44effective when it comes to making
- 22:25:46decisions is to try to be as inclusive
- 22:25:49as possible. If you have time to go
- 22:25:52ahead and make the decision, I always
- 22:25:55try to go ahead and work with the
- 22:25:58individuals who are going to be impacted
- 22:26:00by the decision and share with them what
- 22:26:03needs to happen and try to get their
- 22:26:06input. That doesn't mean I'm going to be
- 22:26:07able to do it their way, but at least I
- 22:26:09want to go ahead and hear what they have
- 22:26:11to say and they may be able to come up
- 22:26:13with some ideas that's going to assist
- 22:26:15with the decision. Now there are times
- 22:26:17when you have to make a decision and you
- 22:26:19don't have an awful lot of time to
- 22:26:21collaborate with individuals but
- 22:26:24whenever that is the case at least I try
- 22:26:26to let the different stakeholders know
- 22:26:28that this is a decision that we're
- 22:26:30making and this is why we are doing it
- 22:26:32as well. The one thing that I really try
- 22:26:35to avoid is catching people by surprise.
- 22:26:39Now there is one tool that I found to be
- 22:26:42pretty effective and it's called nominal
- 22:26:45group technique. I learned that in my
- 22:26:47continuing education program. When there
- 22:26:50is a decision to make, we develop the
- 22:26:53different options and then we let when
- 22:26:56we have the time to do it, the
- 22:26:58stakeholders evaluate and prioritize
- 22:27:01each particular option. There was a case
- 22:27:04when I had to make a decision and there
- 22:27:06were a variety of different ideas on
- 22:27:09what the best options were. But when the
- 22:27:11stakeholders were able to go ahead and
- 22:27:13prioritize these particular options, we
- 22:27:16took the one that was the highest
- 22:27:18priority and while not everybody was
- 22:27:21happy with the decision, at least they
- 22:27:23were part of the decision-making process
- 22:27:25and they agreed to go ahead and give it
- 22:27:27a try.
- 22:27:28>> Did everyone agree with the decision?
- 22:27:31>> No, not really. There were still a few
- 22:27:33people who were a little bit skeptical,
- 22:27:36but because they had been involved and
- 22:27:38everybody had a vote, they at least
- 22:27:41agreed to disagree and when we walked
- 22:27:43out of the room, we were all moving
- 22:27:46forward in the same direction. Yes,
- 22:27:48there was a little bit of skepticism,
- 22:27:50but at least the people were willing to
- 22:27:52go ahead and give it a try. And when
- 22:27:55that is the case, you make sure that if
- 22:27:58it's working, it's great. If it's not,
- 22:28:01go back to the drawing board and
- 22:28:02possibly change direction.
- 22:28:05>> That sounds good. Uh, have you ever had
- 22:28:08a conflict with a co-worker? And if so,
- 22:28:11how did you handle that?
- 22:28:13>> Uh, unfortunately, conflicts are part of
- 22:28:17everyday life in the workplace. And one
- 22:28:20of the things that I learned a long time
- 22:28:22ago is that there's two types of
- 22:28:23conflict. One of them is what is
- 22:28:27referred to as good or functional
- 22:28:28conflict. and the other is bad or
- 22:28:31dysfunctional conflict. So the first
- 22:28:33thing that you have to do is recognize
- 22:28:35when there is a conflict and I find that
- 22:28:37the best way to identify where there is
- 22:28:40a conflict is by walking around and
- 22:28:42meeting with my team and having
- 22:28:44conversations with them as well. But the
- 22:28:47greatest tool that I think that is
- 22:28:49important for a project manager when it
- 22:28:51comes to conflict management is active
- 22:28:54listening.
- 22:28:56always try to go ahead and listen to the
- 22:28:58individual and try to understand what
- 22:29:02their opinion is. Where is their
- 22:29:05opinion, which is the definition of
- 22:29:06conflict, different than yours? And
- 22:29:10don't be judgmental. Try to put yourself
- 22:29:12in their shoes. Try to empathize with
- 22:29:14them a little bit as well and understand
- 22:29:17their perspective. Once you can
- 22:29:20understand their perspective, explain
- 22:29:23your perspective and hopefully between
- 22:29:26the two of you or maybe even more
- 22:29:29individuals, you can have a good
- 22:29:31conversation and collaborate and come up
- 22:29:34with a win-win situation.
- 22:29:37>> Thank you. Maintaining stakeholder
- 22:29:40commitment and motivation is a
- 22:29:42challenge. How do you motivate a team to
- 22:29:44stay the course?
- 22:29:46You know the the team is so important.
- 22:29:50I'm a firm believer that project
- 22:29:52management is not an individual sport.
- 22:29:56Most project managers cannot manage the
- 22:29:58project by themselves. They're very very
- 22:30:00dependent upon the team. So what I have
- 22:30:04learned as a best practice is on day
- 22:30:07number one when you have your project
- 22:30:09charter sit down and try to identify who
- 22:30:12the key stakeholders are, who needs to
- 22:30:15be involved, who's going to be impacted
- 22:30:17by this particular project. Then define
- 22:30:22various roles and responsibilities for
- 22:30:24each particular stakeholder. One of the
- 22:30:27tools that I found that's very effective
- 22:30:29is the REI tool. Assign individuals by
- 22:30:32responsible, accountable, consult, and
- 22:30:36inform. But then make sure that you
- 22:30:39engage with these stakeholders as well.
- 22:30:41Don't simply assign roles and
- 22:30:42responsibilities and assign it via an
- 22:30:45email and assume that everything is
- 22:30:47going to work out. You have to engage
- 22:30:50with each stakeholder. Make sure that
- 22:30:52they understand what their role and
- 22:30:54responsibility is and answer any
- 22:30:56questions that they may have and work
- 22:30:58with them every step along the way in
- 22:31:01case there are blockers or issues that
- 22:31:03develop as you're trying to get the job
- 22:31:05done.
- 22:31:07>> That that leads me to a follow-up
- 22:31:10question here. Uh how do you ensure
- 22:31:12communications with the team is
- 22:31:14effective and can you walk me through
- 22:31:16your process a little bit? Yes,
- 22:31:19communications is absolutely critical.
- 22:31:21Uh, one of the things that I learned
- 22:31:23from some of my managers and I totally
- 22:31:26agree with them, a little quote, and I
- 22:31:28forget exactly who the manager was, but
- 22:31:31communications is the glue that holds
- 22:31:33the project together. So, going back to
- 22:31:36the last question, we talked about
- 22:31:38identification of stakeholders. It's
- 22:31:41very very important to make a
- 22:31:43determination early in the project what
- 22:31:46information is needed by each
- 22:31:48stakeholder and what is not needed. I am
- 22:31:51a firm believer that every project
- 22:31:54manager for a project should develop a
- 22:31:56communications management plan. The
- 22:31:58communications management plan lists
- 22:32:01each communication item, assigns
- 22:32:04responsibility for that particular item,
- 22:32:07and also defines who's going to be a
- 22:32:10recipient of that particular
- 22:32:11communications and why they're going to
- 22:32:14receive it. I try to build the
- 22:32:17communications management plan. I
- 22:32:19identify who the audience is for each
- 22:32:21particular communication item and I try
- 22:32:24to let these individuals know ahead of
- 22:32:26time that you're going to be receiving
- 22:32:28this information and why it is
- 22:32:31important. Again, I don't know who the
- 22:32:34manager was who shared this with me, but
- 22:32:36in project management, effective
- 22:32:39communications is getting the right
- 22:32:41information to the right person at the
- 22:32:44right time in the right amount. So have
- 22:32:46that communications management plan.
- 22:32:49Make sure that all of the key
- 22:32:50stakeholders sign off on it. They buy
- 22:32:53into it and follow it.
- 22:32:56>> That's great. Here's another question.
- 22:32:59You have a a team member who is not
- 22:33:01performing. What would you do?
- 22:33:04>> Well, the first thing that I'm not going
- 22:33:05to do is chastise them and start playing
- 22:33:08the blame game because that's going to
- 22:33:11take it from bad to worse. I always try
- 22:33:14to I try try to believe in an individual
- 22:33:18and that everybody has positive intent.
- 22:33:21So the first thing that I'm going to do
- 22:33:23is sit down with the individual and try
- 22:33:26to identify what the problem is. I'm
- 22:33:29going to explain that this is what I
- 22:33:32thought was going to happen. In my mind
- 22:33:35it didn't happen. Tell me if I'm right
- 22:33:37or wrong. And I'd like to find out from
- 22:33:40you why it didn't happen because here
- 22:33:43was the impact of you not following
- 22:33:45through or perhaps this activity not
- 22:33:49being accomplished as well. And I tried
- 22:33:52to go ahead and again assume that
- 22:33:54positive intent and try to find out what
- 22:33:57the root cause was for the
- 22:33:58non-performance. There may be some
- 22:34:00reason that is bonafide. Maybe the
- 22:34:03individual had an issue and possibly I
- 22:34:06could have done a little bit better job
- 22:34:08understanding that this individual had
- 22:34:10some issues before I was expecting them
- 22:34:14to go ahead and follow through on a
- 22:34:16commitment. I probably could have
- 22:34:18improved the conversation and
- 22:34:20communication a little bit. But I will
- 22:34:22work with this individual, explain the
- 22:34:24problem, explain what the impact of the
- 22:34:27problem was, explain my expectations,
- 22:34:30and ask them, "How can I assist you in
- 22:34:34trying to go ahead and perform better
- 22:34:37the next time?" One of the things that
- 22:34:39I'll also try to do to motivate the
- 22:34:41individual is to try to find a way to
- 22:34:44get them excited about the project and
- 22:34:47the task that I'm asking them to do.
- 22:34:49Show them how they're going to achieve
- 22:34:51something special for themselves. Maybe
- 22:34:54how they're going to be affiliated and
- 22:34:56working with a great team or maybe
- 22:34:58empowered to go ahead and make a
- 22:34:59difference as well. But try to find some
- 22:35:01kind of a a reason to allow them to care
- 22:35:05and value the
- 22:35:07positive aspects of what I'm asking them
- 22:35:10to do and how the results are going to
- 22:35:12be beneficial not only to the company
- 22:35:14but to them as well.
- 22:35:17>> Thank you. I won't lie. Uh you will be
- 22:35:20working in a pressure-filled
- 22:35:21environment. How do you handle working
- 22:35:24under pressure?
- 22:35:26>> Well, I I know that working under
- 22:35:28pressure is very very difficult. One of
- 22:35:30the things that I really try to do each
- 22:35:31particular day is to prioritize my work.
- 22:35:34I may have 10 different things that I
- 22:35:36need to do. But I try to figure out
- 22:35:39those top three or four things that need
- 22:35:42to happen. And how do I prioritize? I
- 22:35:45work very closely with my managers, with
- 22:35:47my customers, with my team members, with
- 22:35:51everybody that is dependent upon me and
- 22:35:54I really try to take things one step at
- 22:35:56a time. In addition, one of the things
- 22:35:58that I don't do is to put adverse
- 22:36:00pressure on myself as well. I found a
- 22:36:03long time ago that you don't want to go
- 22:36:06ahead and overpromise and underperform.
- 22:36:10Last, but certainly not least, as I kind
- 22:36:12of mentioned before, I'm a pretty good
- 22:36:14time manager and I'm able to determine
- 22:36:16how long tasks are going to go ahead and
- 22:36:18take each step along the way. And when I
- 22:36:21do make commitments, normally I follow
- 22:36:23through on them. However, if I can't
- 22:36:25follow through or if something happens,
- 22:36:27I make sure that I alert my manager or
- 22:36:30the stakeholders ahead of time so that
- 22:36:32they're not caught by surprise. So, I
- 22:36:34guess the best way to summarize working
- 22:36:37under pressure is take it one step at a
- 22:36:40time. Do the very best that you can. Dot
- 22:36:42the eyes and cross the tees.
- 22:36:46>> That's great. Our customers can be very
- 22:36:49demanding sometimes. Uh so, how do you
- 22:36:51work with customers to ensure that
- 22:36:53you're satisfying that they're satisfied
- 22:36:55while still satisfying the needs of the
- 22:36:57project?
- 22:36:59>> Uh, absolutely. Another really great
- 22:37:01question as well. Again, I had the
- 22:37:04opportunity to take a lot of continuing
- 22:37:07education courses in project management.
- 22:37:10And the one thing that was really
- 22:37:11ingrained into my head was that as the
- 22:37:15project manager, you and the team do not
- 22:37:17necessarily define what quality is.
- 22:37:20Quality and value is defined by the
- 22:37:23customer. So, the project manager needs
- 22:37:26to sit down with the customer and make
- 22:37:29sure that they truly understand what the
- 22:37:31customer's expectations are. And going
- 22:37:35back to my previous response, make sure
- 22:37:37that you don't overpromise and underdel
- 22:37:40because at the end of the day, when the
- 22:37:42project is complete and you want to go
- 22:37:44ahead and turn over the product or
- 22:37:46service that you created, it's not you
- 22:37:49or the team, but the customer who's
- 22:37:50going to determine if this project
- 22:37:54deliverable actually added the intended
- 22:37:56value that they were looking for as
- 22:37:58well.
- 22:38:00>> Okay, Robert. Well, we have two final
- 22:38:04interviews that we're going to be
- 22:38:05finishing later today. Uh, and we should
- 22:38:08be making our decision in the next day
- 22:38:10or so. Um, we'll definitely be in
- 22:38:12contact with you without delay once we
- 22:38:14have our decision. Do you have any
- 22:38:16questions for me?
- 22:38:18>> Uh, yes. Thank you for the opportunity,
- 22:38:20Leslie. I really appreciate that. My
- 22:38:22first question is, is there anything
- 22:38:24that perhaps I can explain a little bit
- 22:38:27better or do you have any questions in
- 22:38:29your mind about anything that I shared
- 22:38:30with you? and I'd love a chance to go
- 22:38:32ahead and expound upon it or clarify so
- 22:38:35that you have a better understanding.
- 22:38:39>> Uh thank you. Um you said that you were
- 22:38:42pursuing the certified scrum master
- 22:38:44certification. Do you think that
- 22:38:47certification will qualify you to work
- 22:38:50in the agile environment?
- 22:38:53>> You know, I really believe Leslie that
- 22:38:55it does. Uh the certified scrum master
- 22:38:58training was a two-day training
- 22:39:02opportunity from the Scrum Alliance that
- 22:39:05was mandatory before I was able to get
- 22:39:07my certified Scrum Master certification.
- 22:39:10And they walk you not only through the
- 22:39:12process, but they give you a lot of
- 22:39:16examples to go ahead and develop user
- 22:39:18stories and product backlogs and things
- 22:39:20such as this. So from a conceptual
- 22:39:22standpoint, I think I'm in pretty good
- 22:39:24shape. and I had the opportunity to work
- 22:39:27with some project managers who were
- 22:39:29actually implementing projects in my
- 22:39:31current job and I was able to learn from
- 22:39:34them as well. I'm not going to lie to
- 22:39:36you. I'm not going to say that I know
- 22:39:38everything about agile and scrum, but I
- 22:39:40understand the process. I understand the
- 22:39:42concepts. I've had some practical
- 22:39:45application of it. And I'd really love
- 22:39:47the opportunity, which is one of the
- 22:39:49reasons why I'm here today, uh, if I am
- 22:39:52lucky enough to go ahead and get this
- 22:39:54position, to actually expand upon my
- 22:39:59skills and grow them in this particular
- 22:40:01job.
- 22:40:04>> Great. Um, anything else?
- 22:40:07>> Yes. Uh, if I may get a little bit
- 22:40:10personal, Leslie, what do you most enjoy
- 22:40:13uh about working in the current firm or
- 22:40:16your current job? What's the most
- 22:40:19pleasant aspect of your job?
- 22:40:21>> Oh, I would definitely say I love the
- 22:40:24company and the culture and the people
- 22:40:26here. Um, you know, we're all focused on
- 22:40:29adding value to both the company and for
- 22:40:31our customers. So, we all take our job
- 22:40:34very seriously. Um, but we support each
- 22:40:37other and we've formed really strong
- 22:40:38teams, so I love working here.
- 22:40:42>> Wow, that sounds great. Well, I'll keep
- 22:40:45my fingers crossed and hopefully get a
- 22:40:47positive call from you there. I'd love
- 22:40:49to become part of that particular team.
- 22:40:52>> Great. Thanks so much, Robert.
- 22:40:55>> Yeah, thank you again for your time,
- 22:40:56Leslie, and I hopefully look forward to
- 22:40:59talking with you and working with you in
- 22:41:01the future.
- 22:41:02>> Sounds good. Bye-bye.
- 22:41:03>> Bye-bye. With the final interview
- 22:41:06completed, do you think Robert will get
- 22:41:08the job? Reflect on Robert's answers and
- 22:41:10consider how you would answer these same
- 22:41:12questions.
- 22:41:13[Music]
- 22:41:24Welcome to core and behavioral interview
- 22:41:26questions. After watching this video,
- 22:41:27you'll be able to discuss how to respond
- 22:41:30to job and industry specific questions.
- 22:41:32Summarize tips for responding to skill
- 22:41:34and experience questions. Explain how to
- 22:41:36respond to behavioral questions.
- 22:41:38Addressing questions during an interview
- 22:41:40is an art. A key ingredient to your
- 22:41:42success is understanding how to respond
- 22:41:44to different types of questions,
- 22:41:45typically industry specific, skill, and
- 22:41:47experience specific and behavioral
- 22:41:49questions. The interviewer might choose
- 22:41:51to ask questions in any order to assess
- 22:41:53if you are best fit for the role. Let's
- 22:41:56begin with discussing how you can
- 22:41:57respond to industry specific questions.
- 22:42:00The interviewer might choose to assess
- 22:42:01your industry and company knowledge. To
- 22:42:04make sure that you are able to answer
- 22:42:05the interviewer, do your homework ahead
- 22:42:07of time. Research the industry and
- 22:42:08company conducting the interviews ahead
- 22:42:10of time. Understand their mission,
- 22:42:12vision, product mix, goals, and
- 22:42:15objectives. Then map your values,
- 22:42:18passions, goals, and objectives to match
- 22:42:20those of the company. As an interviewee,
- 22:42:23you can proactively showcase your
- 22:42:24industry and company knowledge. When you
- 22:42:27can showcase your knowledge when asked,
- 22:42:29"Tell me something about yourself." The
- 22:42:31response is your elevator pitch, your
- 22:42:33three-part overview that includes who
- 22:42:34you are, what you do, and what you want.
- 22:42:37Tailor your pitch to the industry and
- 22:42:39role you're applying for. For example,
- 22:42:42if you're applying for an IT project
- 22:42:43management position, introduce yourself
- 22:42:46as someone whose passion is providing
- 22:42:47new and improved technology solutions to
- 22:42:50make the lives of many easier. Break out
- 22:42:52what you do into the past, present, and
- 22:42:54future. For example, I began my career
- 22:42:57as a construction project manager, but
- 22:42:59then I transitioned into IT project
- 22:43:01management to satisfy my passion for the
- 22:43:03industry. I hope to take on greater
- 22:43:05responsibilities and share my skills and
- 22:43:07competencies with a company such as
- 22:43:08yours. That's why I'm here today. Next,
- 22:43:11let's look at skill and experience
- 22:43:13specific questions. A successful project
- 22:43:15manager requires both technical and
- 22:43:17interpersonal skills to be successful.
- 22:43:19That said, each position emphasizes
- 22:43:22certain skills that are either required
- 22:43:24or preferred over others. Here are some
- 22:43:26tips on being prepared and responding to
- 22:43:28questions specific to skill and
- 22:43:29experience. Review the job description.
- 22:43:31Ensure you understand the required and
- 22:43:33preferred skills for the job. When
- 22:43:35preparing for the interview, make sure
- 22:43:36to focus on the specified skills.
- 22:43:38Highlight any strong skill you possess
- 22:43:40in any of the required or preferred
- 22:43:43skill areas. Be prepared to share
- 22:43:44examples of how you effectively applied
- 22:43:46those skills and achieved results in
- 22:43:48previous projects. Avoid highlighting
- 22:43:50skills that are not directly listed as
- 22:43:52required or preferred in the job
- 22:43:53description unless an interviewer
- 22:43:55explicitly asks you about other skills.
- 22:43:57Remember, the interviewer is mostly
- 22:43:59concerned about the skills that are
- 22:44:00required to do the job. There might be
- 22:44:02times when you don't have all the
- 22:44:04required or preferred skills. In such
- 22:44:06situations, do some research so that you
- 22:44:08can define the skill and understand why
- 22:44:10it's important. During the interview,
- 22:44:12acknowledge the shortfall and express a
- 22:44:14willingness to learn. Remember, very few
- 22:44:17job applicants match every required and
- 22:44:19preferred skill in the job description
- 22:44:21perfectly. An interviewer prefers to
- 22:44:23hire an individual who possesses several
- 22:44:25key skills and shows a willingness to
- 22:44:27develop those that may require
- 22:44:29improvement. For example, let's say that
- 22:44:31the job description specifies Smart
- 22:44:33Sheet as a required skill. To bridge the
- 22:44:35gap, you can potentially perform the
- 22:44:37following steps before the interview. Go
- 22:44:39online and search for Smart Sheet. Learn
- 22:44:41about what Smart Sheet is and some
- 22:44:42features and functionalities of the
- 22:44:44tool. Map the similarities with any
- 22:44:46other familiar tool such as Microsoft or
- 22:44:49MS Excel. During the interview, respond
- 22:44:52assertively that while you haven't
- 22:44:53experienced the tool, you are confident
- 22:44:55that you will learn the tool quickly. We
- 22:44:57discussed answering industry, company
- 22:44:59specific skill, and experience specific
- 22:45:01questions. Finally, let's review how you
- 22:45:04can prepare for and respond to
- 22:45:06behavioral questions. To answer
- 22:45:07behavioral questions, you can use the
- 22:45:09STAR technique. DAR stands for
- 22:45:11situation, tasks, action, result. To
- 22:45:14prepare for an interview, think about
- 22:45:15potential behavioral questions you might
- 22:45:17be asked. For example, if you're
- 22:45:19applying for a project management
- 22:45:20position in human resources, conflict
- 22:45:22management is one of the key required
- 22:45:24skills. Think of a situation where you
- 22:45:26effectively handled conflict. Then
- 22:45:29explain the task that drove the need to
- 22:45:30resolve the conflict, followed by the
- 22:45:32actions you took to achieve the results.
- 22:45:34Task. I began by identifying the source
- 22:45:37of the conflict and analyze the
- 22:45:38situation leading to the conflict as
- 22:45:40best as I could. Action. I didn't jump
- 22:45:42to conclusions. I took time to
- 22:45:44understand all sides of the issue and
- 22:45:46did my best to understand all
- 22:45:48conflicting perspectives. I then worked
- 22:45:50with the conflicting parties, proposed
- 22:45:51solutions, and chose the best one.
- 22:45:53Result. I implemented the solution and
- 22:45:56evaluated the impacts. There were a few
- 22:45:58starts and stops, but in a short time,
- 22:46:00the two conflicting parties were working
- 22:46:02together and collaborating effectively.
- 22:46:04Interviewers often appreciate your
- 22:46:05ability to show how you used a
- 22:46:07step-by-step approach to achieve a
- 22:46:09result. In this video, you learned that
- 22:46:11there are three types of questions:
- 22:46:13industry specific, skill and experience
- 22:46:15specific, and behavioral. To answer
- 22:46:17industry and company specific questions
- 22:46:19you can research about the industry and
- 22:46:21the company during the interview, use
- 22:46:23the tailored version of the elevator
- 22:46:24pitch to answer the question, "Tell me
- 22:46:26something about yourself." Tips to
- 22:46:28respond to skill and experience specific
- 22:46:30questions include review the job
- 22:46:32description, highlight any strong skills
- 22:46:34you possess, manage lack of skills and
- 22:46:37experience. Use the STAR technique to
- 22:46:39answer behavioral questions. STAR stands
- 22:46:41for situation, task, action, result.
- 22:46:49[Music]
- 22:46:56Welcome to expert viewpoints, interview
- 22:46:59questions. In this video, learn about
- 22:47:01the various types of interviews
- 22:47:03experienced by industry professionals
- 22:47:05and get tips to prepare for these
- 22:47:07interviews effectively. I've been
- 22:47:09interviewed for many roles and the
- 22:47:11interview types have ranged from uh
- 22:47:14problem solving where someone will for
- 22:47:17example give me a coding problem um on
- 22:47:19the board and I have to solve that
- 22:47:21coding problem. Um some interviews have
- 22:47:24been strategic interviews. People will
- 22:47:27ask me questions about um a specific
- 22:47:30problem that the company is facing and
- 22:47:31how I would in the abstract or you know
- 22:47:34potentially solve them. Um, other
- 22:47:37interview types are um, playing
- 22:47:39different roles. So, you're applying for
- 22:47:41a software development role or project
- 22:47:43management role, but what if you were a
- 22:47:46software tester or what if you were a
- 22:47:48marketing person? How would you think
- 22:47:50about the business differently? And
- 22:47:52those types of interviews are really
- 22:47:54designed to get you to think about the
- 22:47:55business more broadly rather than just
- 22:47:57the specific role you're in. Um the the
- 22:48:01other type of interview that was really
- 22:48:02popular um at Microsoft and other
- 22:48:04technical companies was um interview
- 22:48:08questions that would ask you to solve
- 22:48:09problems um or interviews you know
- 22:48:11styles that would ask you to solve
- 22:48:12problems. So one question I got one
- 22:48:15asked one time was um come up with a
- 22:48:18test plan for a Coke can. That was a
- 22:48:20that was a popular technical uh
- 22:48:22interview question that people would
- 22:48:24ask. But what what the interviewer was
- 22:48:26trying to do is to see how you thought
- 22:48:27analytically and how you thought um
- 22:48:30about you know solving problems that
- 22:48:32weren't at all a part of the scope of
- 22:48:33the job just to see how your mind works.
- 22:48:36So when you're thinking about uh
- 22:48:38interviews you have to think about the
- 22:48:40potential that all of those types might
- 22:48:42be a part of how you might be uh you
- 22:48:44know interviewed particularly for
- 22:48:45project management because project
- 22:48:47management requires such a broad set of
- 22:48:49skills. So interviews are unique. Uh
- 22:48:51each one is unique and and if you really
- 22:48:53sit back and reflect on it, you can tell
- 22:48:56that these interviewers that come to you
- 22:48:58have very specific things they're
- 22:49:00looking for. Sometimes you'll be in a
- 22:49:02panel interview. Sometimes you'll be in
- 22:49:03an online interview. Sometimes you'll be
- 22:49:05face tof face with just one person.
- 22:49:07You'll get interviews where they're
- 22:49:08asking you really strange questions like
- 22:49:11um how would you test a television set
- 22:49:13or how would you test a Coke can or um
- 22:49:16just really strange questions. um you
- 22:49:19need to with some of the preparation and
- 22:49:21rehearsal that you do. You can be
- 22:49:22prepped for those strange questions, but
- 22:49:25be adaptable, be flexible with your
- 22:49:27approach to those different scenarios.
- 22:49:29And don't be afraid, like I mentioned
- 22:49:30before, this is kind of the advice here.
- 22:49:32Don't be afraid to pause and ask
- 22:49:34questions. You'll find that interviewers
- 22:49:36are very happy to help you um to
- 22:49:39clarify. They don't expect you to know
- 22:49:42everything off the top of your head. So
- 22:49:43if you pause for a moment and ask for a
- 22:49:45clarification, that is a very acceptable
- 22:49:47thing to do in interview. Um and and so
- 22:49:50don't be afraid to do that.
- 22:49:54>> What are some tips you can provide to
- 22:49:56prepare effectively?
- 22:49:57>> So to prepare for an interview, there's
- 22:49:59a couple things that you should do. Um
- 22:50:02research the company and the role for
- 22:50:03one. So make sure you understand a
- 22:50:06little bit about the company and the
- 22:50:08role that you are interviewing for. um
- 22:50:12rehearsing some common interview
- 22:50:14questions. So, a big one that a lot of
- 22:50:17people start out with is can you tell me
- 22:50:19a little bit about your experience? And
- 22:50:21this is where uh having a 30 second to
- 22:50:25one minute long elevator speech can
- 22:50:27really help you because then you can
- 22:50:30answer that question right off the bat
- 22:50:31and that gives you a little bit of
- 22:50:32confidence to get through the rest of
- 22:50:34the interview very easily. So rehearse
- 22:50:38some of those common interview questions
- 22:50:40and prepare. And then finally,
- 22:50:43all of the logistical details. So if
- 22:50:45your interview, your first round
- 22:50:47interview is a virtual interview, make
- 22:50:50sure that you have a quiet place uh that
- 22:50:54you can take the interview from, that
- 22:50:56your computer or your phone or whatever
- 22:50:59device that you're taking that interview
- 22:51:01on is fully charged or you have a
- 22:51:03charging cable nearby. um thinking
- 22:51:06through all of those things uh to like
- 22:51:10the logistical things. If you're meeting
- 22:51:12someone in person and you're going to an
- 22:51:14office, thinking through uh and planning
- 22:51:18out the the journey, so how are you
- 22:51:21going to get there? What time do you
- 22:51:22need to leave so that you can be there a
- 22:51:24little bit early? Is there security at
- 22:51:27the company that you have to get through
- 22:51:28where you have to sign in before you can
- 22:51:30actually get to the place where you're
- 22:51:33going to be doing the interview? Because
- 22:51:34that always takes some time. Be really
- 22:51:37conscious about the clothes that you're
- 22:51:38wearing and that um you know they're
- 22:51:42appropriate for the style of interview
- 22:51:44that you're doing. If you're in person,
- 22:51:46obviously head to toe, you need to be
- 22:51:48dressed uh in a way that represents you
- 22:51:51as a professional and a professional in
- 22:51:53that role or for that employer. If it's
- 22:51:56a company that you know is more relaxed
- 22:51:58on dress code, then one up it. You
- 22:52:01always want to be overdressed versus
- 22:52:03underdressed. Of course, at home, uh if
- 22:52:06you're doing a video, you have a little
- 22:52:07more leeway on what you wear. Um, but
- 22:52:10still you really want to look
- 22:52:11professional from the waist up and make
- 22:52:14sure that your background is very
- 22:52:16neutral. Blur it. Um, if you can blur
- 22:52:19it, whatever app you're using for the
- 22:52:21video. And then, um, practice uh, where
- 22:52:25your eyes are looking. Make sure that
- 22:52:28you know you you're centered. Make sure
- 22:52:29that you are representing uh, yourself
- 22:52:32in the best way possible. Get all those
- 22:52:34things out of the way. um you know
- 22:52:37beforehand, day beforehand, practice,
- 22:52:39whatever. Get all of that done so you
- 22:52:41don't have to worry about any of that at
- 22:52:43all. And then really focus on preparing
- 22:52:46questions and answers. Um is as
- 22:52:48important for you to ask questions as it
- 22:52:51is for you to answer their questions.
- 22:52:53through your questions, you're showing
- 22:52:55how well you research the company, how
- 22:52:57much that role means to you, how much
- 22:52:59that job means to you, and um where you
- 22:53:03can really have a conversation with the
- 22:53:04person that's interviewing you so that
- 22:53:06you can make an assessment of is this
- 22:53:08the right company for me as much as are
- 22:53:11you the right person for them. I would
- 22:53:13say don'ts are um you know, don't have a
- 22:53:17lot of extraneous noise if you're at
- 22:53:19home. Don't show up late if you're
- 22:53:21interviewing in person. Um, be prepared
- 22:53:24with a bottle of water. They may not, if
- 22:53:26you're in person, they may not offer you
- 22:53:27something, although I think that's
- 22:53:28fairly standard, but take a bottle of
- 22:53:30water with you. If you're at home, have
- 22:53:32water ready to go in case you need to
- 22:53:34clear your throat. And then, you know,
- 22:53:36just just take a deep breath and stay
- 22:53:38calm and do your best.
- 22:53:44[Music]
- 22:53:50Welcome to trick and illegal questions.
- 22:53:53After watching this video, you'll be
- 22:53:54able to discuss trick questions, explain
- 22:53:57illegal questions, and improper
- 22:53:59behavior. Some interviews may be more
- 22:54:01difficult than others. When interviewing
- 22:54:03for mid to high-end project management
- 22:54:05positions, the questions become more
- 22:54:07difficult. In some cases, trick
- 22:54:09questions may be used. Trick questions
- 22:54:11are used when the interviewer wants to
- 22:54:13learn about you and see how you handle
- 22:54:15yourself under pressure and in stressful
- 22:54:17situations and observe your thought
- 22:54:19process and critical thinking skills.
- 22:54:22Trick questions may not pertain directly
- 22:54:24to the job you are interviewing for or
- 22:54:26your specific work experience. In other
- 22:54:28cases, they may ask you to respond to
- 22:54:30how you handle difficult scenarios that
- 22:54:32could present themselves in the position
- 22:54:33you're applying for. Let's illustrate
- 22:54:36three examples. Example one, what are
- 22:54:38your weaknesses? This is a difficult
- 22:54:41question and you must be careful about
- 22:54:43how you respond. Try to avoid sharing a
- 22:54:45weakness that directly relates to a key
- 22:54:47skill requirement for the position. Such
- 22:54:49a response in essence states, "I'm not
- 22:54:52qualified." Share something that cannot
- 22:54:54harm your chances. For example, I'm a
- 22:54:57perfectionist. Sometimes I need to slow
- 22:54:59down and not be so strict. Always add,
- 22:55:01"I'm working on it." This answer
- 22:55:03responds to the question. It shows
- 22:55:05self-awareness, but it also shows you
- 22:55:08take pride in your work. It turns a
- 22:55:10negative into somewhat of a positive.
- 22:55:12Example two, why do you want to leave
- 22:55:14your current job? This is another trick
- 22:55:16question. For starters, do not say bad
- 22:55:19things about your current position.
- 22:55:20Simply state that you're looking for a
- 22:55:22position that provides greater
- 22:55:23opportunities.
- 22:55:25In addition, avoid saying negative
- 22:55:26things about the company. The
- 22:55:28interviewer will conclude that you are
- 22:55:30negative about your past jobs. You will
- 22:55:31likely be negative about the new job in
- 22:55:33the future. A good response is, "I
- 22:55:36enjoyed my current job, but I believe
- 22:55:38this position is more aligned with my
- 22:55:39long-term career growth and development
- 22:55:42goals and will be a great opportunity to
- 22:55:44learn new skills and gain new
- 22:55:45experience." Example three, tell me
- 22:55:48about a time you disagreed with the
- 22:55:50supervisor. This is a very tough
- 22:55:52question. Avoid negativism. Be
- 22:55:54objective. Address the situation in
- 22:55:56terms of what happened, how you address
- 22:55:58the problem, and the result. Address the
- 22:56:00problem, not the person. A potential
- 22:56:02response may be, "My supervisor
- 22:56:04requested I take actions that were
- 22:56:06contrary to company policies. I stated
- 22:56:08that I understood the intent, but
- 22:56:10pointed out the current policy that did
- 22:56:12not support my supervisor's request. We
- 22:56:14worked together to find a legal
- 22:56:15workaround that solved the issue. There
- 22:56:18are some questions that must be avoided.
- 22:56:20You should not ask them as an
- 22:56:21interviewer or as an interviewee.
- 22:56:23Personal questions should be avoided.
- 22:56:25Questions about an individual's weight,
- 22:56:27how they look, and their family status
- 22:56:29are illegal. For example, I see you're a
- 22:56:32single mother. How will this job impact
- 22:56:34your ability to care for your children?
- 22:56:36Another example is, "Do you have any
- 22:56:38disabilities that will impact your job
- 22:56:39performance?" This is an illegal
- 22:56:41question that is discriminatory against
- 22:56:43those with disabilities. Questions about
- 22:56:45religion and politics are to be avoided
- 22:56:47as well. An individual's religion and
- 22:56:49political preferences have nothing to do
- 22:56:51with their qualifications to perform the
- 22:56:52job. If you're asked an illegal
- 22:56:55question, do not show anger and maintain
- 22:56:57your poise. Simply state that you prefer
- 22:56:59not to respond to the question as
- 22:57:00personal issues or personal political
- 22:57:02and religious beliefs will not interfere
- 22:57:04with job performance. Then politely ask
- 22:57:06for the next question. There are many
- 22:57:08behaviors to avoid that may be deemed as
- 22:57:10improper. This guidance applies to both
- 22:57:13the interviewer and the interviewee.
- 22:57:15Electronic devices. Do not use
- 22:57:17electronic devices such as cell phones
- 22:57:19during an interview. Electronic devices
- 22:57:21are convenient. However, they create a
- 22:57:23physical barrier and result in lost eye
- 22:57:26contact and focus. Use a notebook and
- 22:57:28pen if you need to take notes. Language.
- 22:57:31Avoid using profanity or language that
- 22:57:33may be deemed disrespectful or
- 22:57:35offensive. Ask people how they prefer to
- 22:57:37be addressed when the interview kicks
- 22:57:38off. For example, do you go by Robert or
- 22:57:41prefer Bob? Hostility. Avoid making
- 22:57:44derogatory statements about past jobs,
- 22:57:47companies you have worked for,
- 22:57:48colleagues or managers. This sends a
- 22:57:51negative message about your character
- 22:57:52and professionalism. Personal
- 22:57:55relationship building. An interview
- 22:57:57should be confined to a professional
- 22:57:59conversation regarding the company's
- 22:58:00needs and the application's
- 22:58:02qualifications. Avoid any conversation
- 22:58:05or gestures that could be perceived as
- 22:58:06flirtatious or out of bounds. Arrogance.
- 22:58:09Avoid creating a perception where the
- 22:58:11interviewer sees you as arrogant. Show
- 22:58:13confidence, but also share some humility
- 22:58:16and show appreciation for the interview
- 22:58:18opportunity and a willingness to learn
- 22:58:19and grow. In this video, you learned
- 22:58:22that you should plan for trick questions
- 22:58:24and tough questions. Illegal questions
- 22:58:26and improper behavior must be avoided.
- 22:58:28Some tips to manage illegal questions
- 22:58:30include do not use electronic devices.
- 22:58:34Avoid using profanity, avoid making
- 22:58:36derogatory statements, confine to a
- 22:58:38professional conversation. Avoid
- 22:58:41creating a perception of arrogance. You
- 22:58:43must plan, prepare, and avoid potential
- 22:58:46pitfalls.
- 22:58:47[Music]
- 22:58:58Welcome to Expert Viewpoints, difficult
- 22:59:00questions. In this video, industry
- 22:59:02professionals share examples of tricks
- 22:59:04an interviewer might ask and illegal
- 22:59:06questions that should be avoided.
- 22:59:08>> So, there's a couple things that stand
- 22:59:10out to me with regards to those trick
- 22:59:12questions. One of them is you'll find in
- 22:59:15most interviews when they get to the end
- 22:59:17of the interview, they will turn some
- 22:59:19time over to you as the interviewing as
- 22:59:21the interviewer to ask any questions
- 22:59:24that you might have. They're not doing
- 22:59:26that just out of courtesy. They're doing
- 22:59:28that to get a sense of your passion for
- 22:59:30the job. They want to see um are you
- 22:59:33really invested in in this role? Because
- 22:59:36they're they're not just looking for
- 22:59:38somebody that can do the job. they're
- 22:59:40looking for somebody that really wants
- 22:59:43to do the job. So, don't uh take that,
- 22:59:47do you have any questions for me
- 22:59:48opportunity um too lightly. Be prepared
- 22:59:51with some questions that you can ask
- 22:59:52that are compelling. And then there's
- 22:59:54always a number of questions that are
- 22:59:56that are kind of they they seem a little
- 22:59:58bit backwards and tricky, like tell me
- 23:00:01about one of your greatest weaknesses.
- 23:00:04Um, they're looking for when somebody
- 23:00:06asks you a question like that, they're
- 23:00:08looking for something very specific. Um,
- 23:00:10they want to know how honest you are.
- 23:00:12They want to know how self-aware you are
- 23:00:14and how able you are to offer
- 23:00:16self-criticism and provide a story that
- 23:00:19shows how you are aware and can move
- 23:00:21beyond and improve on those things that
- 23:00:24need improvement. So, lots of trick
- 23:00:26questions out there. Those are kind of
- 23:00:27two that come to the top of my mind.
- 23:00:30>> Well, first of all, what is a trick
- 23:00:32question? First of all, a trick question
- 23:00:35possibly doesn't pertain directly to the
- 23:00:38company or the job or even your work
- 23:00:42experience. It's not really
- 23:00:43skills-based.
- 23:00:45What a trick question is is an attempt
- 23:00:48by an interview to kind of put some
- 23:00:52stress on you, to put some pressure on
- 23:00:54you, and see how well you think out of
- 23:00:56the box. Let me give you an example of a
- 23:00:59trick question. What are your
- 23:01:00weaknesses? The worst thing that you can
- 23:01:03do is to share something that will harm
- 23:01:05your chances. For example, if effective
- 23:01:09facilitation is a required competency
- 23:01:14for this particular position, it would
- 23:01:16probably not benefit you to share, well,
- 23:01:19I really do a poor job at facilitation.
- 23:01:21As a matter of fact, I really hate
- 23:01:23facilitation. I get nervous and it never
- 23:01:26works out. You've just essentially told
- 23:01:28the interviewer that, "Hey, please feel
- 23:01:31free to go ahead and take me off your
- 23:01:33list." Try to turn this potential
- 23:01:36negative,
- 23:01:38what are your weaknesses into an
- 23:01:39opportunity? One of my favorites I like
- 23:01:42to share. I'm a perfectionist. Sometimes
- 23:01:45I need to slow down and
- 23:01:48I know that I'm very, very strict, but I
- 23:01:52just want to do a good job. But I know
- 23:01:54that sometimes being a perfectionist is
- 23:01:56not the best. Sometimes you have to go
- 23:01:58ahead and accept that 80% solution. But
- 23:02:01I'm working on it. I'm doing my best.
- 23:02:04Here's another popular trick question.
- 23:02:06Why do you want to leave your current
- 23:02:08job? Do not, and let me put that in
- 23:02:12caps. Do not say anything bad about your
- 23:02:16past company, about your past managers,
- 23:02:19or anything. Do not go ahead and put
- 23:02:22others in a bad light. Simply state that
- 23:02:26you're looking for a new position.
- 23:02:28That's why I'm here. That will allow me
- 23:02:30to better apply my development goals and
- 23:02:35learn some new skills that I want to go
- 23:02:37ahead and perfect. That keeps it
- 23:02:40positive.
- 23:02:43>> Can you provide examples of illegal
- 23:02:45questions that should be avoided? There
- 23:02:47are many questions that interviewers
- 23:02:48should not ask and that you probably
- 23:02:51should not ask of the interviewer. Many
- 23:02:53of them have to do with um your personal
- 23:02:55life um and um what your values are in
- 23:02:59your personal life. Um questions should
- 23:03:02always be focused on the job. So for
- 23:03:03example, an interviewer can ask, "Are
- 23:03:06you able to work 9 to5 Monday through
- 23:03:08Friday?" They shouldn't ask um are you
- 23:03:11planning to get pregnant anytime soon?
- 23:03:13or are you planning to take vacations
- 23:03:15that are extended? Um or do you have
- 23:03:17sick relatives? Um those are not
- 23:03:20relevant for the job. If you answer the
- 23:03:23question, yes, I can work um you know,
- 23:03:25Monday through Friday from 9 to5, then
- 23:03:27all of that other stuff is is not is not
- 23:03:30relevant for your ability to get your
- 23:03:32work done. So, I would listen for those
- 23:03:35things um when you're being interviewed.
- 23:03:37And you can politely refuse to answer.
- 23:03:39you can you can provide um alternate
- 23:03:42answers too. So if an interviewer said
- 23:03:44you have a sick relative, you can say,
- 23:03:46"I'm able to work um for the hours that
- 23:03:49this job requires." And that's a good
- 23:03:51way to kind of diffuse the situation,
- 23:03:53but also provide an answer that the
- 23:03:54interviewer may be asking for.
- 23:03:57The interview meeting may vary depending
- 23:04:00on who you're talking to and you may
- 23:04:02find yourself very comfortable uh
- 23:04:04talking with the interviewe and they may
- 23:04:06feel very comfortable talking with you
- 23:04:08and the conversation the interview then
- 23:04:11becomes more of a conversation and you
- 23:04:13need to be very wary about that because
- 23:04:16that's when um for no bad reason
- 23:04:20somebody may ask you a question that's
- 23:04:21inappropriate during an interview. Uh
- 23:04:24inappropriate questions would be
- 23:04:25anything about um your current marital
- 23:04:28status, your sexual orientation, your
- 23:04:31gender. Um you know, for women, whether
- 23:04:34you're pregnant or not, uh for men, um I
- 23:04:38can't think of any that would be
- 23:04:39analogous to pregnancy, but uh anything
- 23:04:41that infringes on your own personal uh
- 23:04:44beliefs, religion, race, uh anything
- 23:04:48like that. uh anything that is personal
- 23:04:51background about family or you know
- 23:04:54anything that's just not relevant to the
- 23:04:57job at hand I think is um inappropriate
- 23:05:00the the ones so and then uh employment
- 23:05:03law varies by country and so you know
- 23:05:06what's illegal in the US may not be
- 23:05:08illegal in a different country and vice
- 23:05:10versa u but in the US it's uh the
- 23:05:13illegal questions are anything that has
- 23:05:15to do with race, gender, marital status,
- 23:05:18uh anything along those lines that um
- 23:05:21are classified as discriminatory.
- 23:05:23[Music]
- 23:05:34Welcome to salary negotiation. After
- 23:05:36watching this video, you'll be able to
- 23:05:38summarize tips for effective salary
- 23:05:40negotiation, discuss a total
- 23:05:42compensation, explain a fair offer.
- 23:05:45Negotiating salary is a step closer to
- 23:05:48getting the job. However, as daunting as
- 23:05:50it can be, negotiation is an important
- 23:05:52part of the job search process. Let's
- 23:05:54begin with some tips to help you
- 23:05:56effectively address and negotiate your
- 23:05:58salary needs. Tip one, research industry
- 23:06:01salary trends. Research the average
- 23:06:04salary range for the position you are
- 23:06:06seeking and consider the industry and
- 23:06:07geographic location of the position. The
- 23:06:10research will provide a benchmark for
- 23:06:11you to use when determining your value
- 23:06:13and worth. Tip two, don't underestimate
- 23:06:16your value. Consider your education,
- 23:06:19experience, skills, and other factors
- 23:06:21that can influence your compensation.
- 23:06:23You should market and share your skills
- 23:06:25that might justify a salary offer at the
- 23:06:27high end of the fair salary range. Tip
- 23:06:30three, have a salary range in mind. For
- 23:06:32example, your research might justify a
- 23:06:35salary range of $60,000 to $80,000 for
- 23:06:38the project management related position
- 23:06:39you're applying for. You can negotiate
- 23:06:41for a single salary rate, for example,
- 23:06:44$70,000. A salary range allows both you
- 23:06:47and the employer to be more flexible
- 23:06:49during the salary negotiation stage. Tip
- 23:06:52four, optimally, wait for the employer
- 23:06:54to initiate the salary discussion. If
- 23:06:57they don't initiate the discussion, ask
- 23:06:59politely if it is a good time to discuss
- 23:07:01salary. It is best to present a salary
- 23:07:03range you believe is fair. Ensure you're
- 23:07:05willing to accept a salary proposal
- 23:07:07within that range. Expect the employer
- 23:07:10to offer at a low end. Be prepared to
- 23:07:12justify why you believe the offer should
- 23:07:14be at the higher end. Be confident and
- 23:07:16professional when discussing your
- 23:07:17salary. Tip five, be prepared to walk
- 23:07:20away. If your employer is not willing to
- 23:07:22meet your minimum salary requirement or
- 23:07:24offer additional total compensation
- 23:07:26benefits that make it worth your while,
- 23:07:28continue your job search elsewhere. Be
- 23:07:31respectful. Thank the employer for the
- 23:07:32offer and politely let them know that
- 23:07:34the proposal does not meet your
- 23:07:35expectations. You now have some tips on
- 23:07:38negotiating a salary. Related to your
- 23:07:40salary is the total compensation
- 23:07:42package, which includes much more than
- 23:07:44just the salary you receive. You should
- 23:07:46understand the value of the total
- 23:07:48compensation package before you finalize
- 23:07:50salary negotiations and agree to an
- 23:07:52offer. Total compensation packages vary
- 23:07:55by company. Additional compensation
- 23:07:57beyond strictly salary may include
- 23:07:59bonuses and commissions. Some jobs offer
- 23:08:02an initial sign on bonus. Others offer a
- 23:08:05combination of base salary and
- 23:08:06commissions. Paid time off. This is a
- 23:08:09plus. Your job is important, but your
- 23:08:11work life balance is important as well.
- 23:08:14Factor in paid time off. It matters.
- 23:08:17Medical, dental, and vision insurance.
- 23:08:19Research the cost of this insurance if
- 23:08:21you were to contract for it on your own.
- 23:08:23The costs are high. You need to include
- 23:08:25this value as a part of the overall
- 23:08:27compensation package. 401k or other
- 23:08:30retirement savings plans. Some companies
- 23:08:33offer matching 401k contributions or
- 23:08:35reduced cost employee stock purchase
- 23:08:37programs. Other companies may offer
- 23:08:39stock options for higherend positions.
- 23:08:42Factor this into the total compensation
- 23:08:44package evaluation. Child care, flexible
- 23:08:47work hours, and subsidized training and
- 23:08:49education. This is another benefit to
- 23:08:51consider. Having considered the total
- 23:08:54compensation, let's look at some
- 23:08:55considerations to determine whether or
- 23:08:57not a salary offer is fair. The industry
- 23:09:00and location of the company impact
- 23:09:02salary. Salary ranges for a project
- 23:09:04manager in a high-tech industry located
- 23:09:06in a large metropolitan area likely to
- 23:09:09be higher than a position with a smaller
- 23:09:11non-technical company in a more rural
- 23:09:13area. Your experience, knowledge,
- 23:09:15training, and accomplishments must be
- 23:09:17considered. Review the job description.
- 23:09:19Are you lacking some job qualifications?
- 23:09:22If so, you may receive an offer in the
- 23:09:24lower range. Do you meet or exceed the
- 23:09:26job requirements? If so, negotiate a
- 23:09:29salary in the mid or higher average
- 23:09:30salary ranges. Don't forget to factor in
- 23:09:34compensation beyond the actual annual
- 23:09:36salary offered. These numbers matter.
- 23:09:40In this video, you learned that
- 23:09:42negotiating salary can be daunting but
- 23:09:44important. Some negotiation tips include
- 23:09:48research industry salary trends. Don't
- 23:09:50underestimate your value. Have a salary
- 23:09:52range in mind. Wait for the employer to
- 23:09:55initiate a discussion. Be prepared to
- 23:09:57walk away. Total compensation includes
- 23:10:00salary you receive, bonuses and
- 23:10:03commissions, paid time off, medical,
- 23:10:05dental, and vision insurance, 401k or
- 23:10:09other retirement savings plan, child
- 23:10:11care, flexible work hours, and
- 23:10:13subsidized training education.
- 23:10:15Considerations for a fair offer include
- 23:10:17industry and location of the company,
- 23:10:20your experience, knowledge, training,
- 23:10:22and accomplishments, compensation beyond
- 23:10:24the actual annual salary.
- 23:10:26[Music]
- 23:10:38Welcome to expert viewpoints job offers.
- 23:10:41In this video, get recommendations about
- 23:10:44how to handle job offers and what to do
- 23:10:46if a job offer is not received.
- 23:10:49>> So, when a job offer is received, you
- 23:10:52should uh get something in writing. And
- 23:10:54so, read through uh the the document
- 23:10:57that's provided to you. Make sure that
- 23:10:59it reflects everything that you've
- 23:11:01discussed and agreed upon in any
- 23:11:04interviews or any uh verbal meetings
- 23:11:07that you've had. And then also read
- 23:11:10through it uh for the conditions of
- 23:11:11employment. Go through step by step um
- 23:11:14you know the the terms of employment,
- 23:11:16the terms of leaving employment, what
- 23:11:19the offer is from a salary perspective.
- 23:11:21Um what the benefits are, look closely
- 23:11:24at for the US, look closely at your
- 23:11:26health insurance benefits and really for
- 23:11:29anywhere, but um I'm most familiar with
- 23:11:31that realm. and then uh any sort of
- 23:11:34retirement or uh 401k, any of those
- 23:11:38additional um incentives to join the
- 23:11:42company. Also, um any negotiations that
- 23:11:46you've done, make sure that your your
- 23:11:49understanding of what those negotiations
- 23:11:52were and are are reflected in the right
- 23:11:55terminology. And so that could be
- 23:11:57anything from u maybe a hiring bonus to
- 23:12:00uh vacation or um a start date, anything
- 23:12:04like that. So really go through with a
- 23:12:06fine tooth comb if you need to have your
- 23:12:09lawyer look at it. um if there's
- 23:12:11anything in there that you don't
- 23:12:12understand, but also if if you have
- 23:12:15questions, go back and ask your
- 23:12:17potential employer for clarification
- 23:12:19because they should be able to um help
- 23:12:22you understand everything that's in
- 23:12:23there and then you're also hearing it in
- 23:12:25their words as well and and further
- 23:12:27reflects their understanding of what's
- 23:12:30included in the job offer.
- 23:12:32So, um, one of the really important
- 23:12:37points of advice relative to receiving
- 23:12:39that job offer is to just take the time
- 23:12:42to reflect or to respond with an offer
- 23:12:48of gratitude and appreciation for the
- 23:12:51offer that's being extended. Um, you
- 23:12:54will hopefully be in a situation where
- 23:12:56you have multiple offers to consider.
- 23:12:58Um, and even if it's an offer from
- 23:13:02someone that you don't think you're
- 23:13:03going to accept, you should still take
- 23:13:05the time to extend that gratitude
- 23:13:08through an email or a phone call to
- 23:13:11express gratitude for the time that
- 23:13:13they've spent in considering you. If it
- 23:13:15is a job that you think you're going to
- 23:13:16accept, you know, take a couple extra
- 23:13:18steps in that messaging to say, "Thank
- 23:13:20you so much for your consideration. I'm
- 23:13:22excited about this opportunity. there's
- 23:13:23a couple things that I need to do to
- 23:13:26make sure that all of my um all of my
- 23:13:29ducks are in a row and I'm lined up to
- 23:13:31accept this. So, give them a time frame.
- 23:13:34I will get a response to you within 24
- 23:13:36hours. Um but reaching out after the
- 23:13:39interview is an incredibly important um
- 23:13:41process that that they will notice.
- 23:13:47>> What do you recommend if a job offer is
- 23:13:49not received? If you interview for a
- 23:13:52position and you don't get the job, um
- 23:13:54the best thing that you can do is to um
- 23:13:57is to first of all learn from it and
- 23:13:59make sure you understand
- 23:14:01um you know areas maybe where you need
- 23:14:03to beef up your skill set or get more
- 23:14:05experience. Um sometimes hiring managers
- 23:14:08will be open to providing that feedback.
- 23:14:11Um, in most cases, what I like to see as
- 23:14:14an interviewer and what I've done as an
- 23:14:16interviewee is to send the hiring
- 23:14:18manager or the recruiter a polite note
- 23:14:20thanking them for their time and for the
- 23:14:22opportunity that they gave you to
- 23:14:24interview with them. Um, if I had a good
- 23:14:26rapport with the hiring manager as an
- 23:14:28interviewee, I might ask them for
- 23:14:30feedback. Uh, would you please provide
- 23:14:32me with some insights into what I could
- 23:14:34have done better or skills that I was
- 23:14:36lacking? And occasionally a hiring
- 23:14:38manager will provide that for you so you
- 23:14:40can do better the next time. Um,
- 23:14:43sometimes I've gotten notes from
- 23:14:45interviewees where they've really
- 23:14:47pressed the subject and they they wanted
- 23:14:49to know exactly why they didn't get
- 23:14:51hired. And those questions to me are can
- 23:14:54be inappropriate because sometimes I
- 23:14:56can't tell them. um there's legal
- 23:14:58reasons uh you know things that I can't
- 23:15:00say uh in response and so when an
- 23:15:03interviewee presses that point too much
- 23:15:05it can come across as aggressive and
- 23:15:07uncomfortable. So always start with a
- 23:15:09polite note thanking them for their time
- 23:15:11and then uh occasionally you might want
- 23:15:13to get some feedback when you you know
- 23:15:15feel like the situation uh warrants it.
- 23:15:19Well, first and foremost, don't stop
- 23:15:21your job search and do not stop applying
- 23:15:24for other opportunities.
- 23:15:27Accept the situation. Accept your
- 23:15:29emotions. Give yourself a little bit of
- 23:15:32time to go ahead and process this.
- 23:15:35Most people do not get their first or
- 23:15:38second or third job at the first,
- 23:15:41second, or third interviews. This is a
- 23:15:44process. It takes some time.
- 23:15:47Be gracious.
- 23:15:49stay connected. As a matter of fact,
- 23:15:51before you leave the room, one of the
- 23:15:53things you may want to request is,
- 23:15:56"Well, I'd be curious to see if there
- 23:15:57are any other roles or positions that
- 23:16:00you might think I'm eligible for, and I
- 23:16:03really would appreciate any feedback
- 23:16:05that you can go ahead and provide me in
- 23:16:08terms of how can I improve my
- 23:16:09interviewing skills."
- 23:16:12Next, reflect on the interview process.
- 23:16:16Do a retrospective. what went well? What
- 23:16:18can I do better next time? And whatever
- 23:16:21changes are required, don't be afraid to
- 23:16:24make those changes. Sometimes the
- 23:16:26interview process, you start out at
- 23:16:28good, you get better, and then hopefully
- 23:16:31you can become great at this. And when
- 23:16:33you become great at it, hey, you might
- 23:16:35be able to get that job of your dreams.
- 23:16:38Last but not least, consider what you
- 23:16:40liked about the job, but consider what
- 23:16:42you didn't like about the job as well.
- 23:16:45Because sometimes not getting selected
- 23:16:47for an offer is a blessing in disguise.
- 23:16:50Sometimes maybe there is something
- 23:16:52different out there for you and you just
- 23:16:54have to be patient and have confidence
- 23:16:57in yourself that sooner or later that
- 23:17:00right offer will come along.
About this transcript
This page contains the full transcript of Project Management Complete Course 2025 (23 Hours): PMBOK 7, Agile, Practice Tests & Career Guide by My Lesson, generated from the public captions YouTube serves with the video. The transcript has 211,287 words across 34,355 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, caption language selection, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.