  1. 0:04welcome to the eono PAC food packaging
  2. 0:06podcast I'm Sarah the sales of marketing
  3. 0:08coordinator and I'm Mike me the general
  4. 0:10manager here at eono Pac and we're here
  5. 0:13with Patrick Sullivan our plant manager
  6. 0:15welcome Patrick hello how are you guys
  7. 0:17doing great good yeah so we want to ask
  8. 0:21you because we know you've had quite the
  9. 0:22journey here can you tell us about your
  10. 0:24entire career here at aona Pac starting
  11. 0:26from the beginning um yeah it's quite
  12. 0:29extensive so I guess I'll keep it short
  13. 0:31um so basically I started here in
  14. 0:352015 as a general line worker and then
  15. 0:39um got promoted to line
  16. 0:41leader um after that they switched me up
  17. 0:44for a little bit and then I was a floer
  18. 0:46for products I was like a product Supply
  19. 0:48basically um after that I think I did
  20. 0:51that for like a year they switched me to
  21. 0:54a mechanic to work on the machines here
  22. 0:56so that was like another side step
  23. 0:59basically and then um I became the lead
  24. 1:02mechanic here on first shift and then
  25. 1:05after that they changed me to the
  26. 1:07production scheduler and then once I got
  27. 1:10a grasp of that they switched me again
  28. 1:12to plant manager so and you keep saying
  29. 1:16they switched me but I'm sure like you
  30. 1:18had some initiative there uh definitely
  31. 1:21yeah I mean I've I'm one to push as much
  32. 1:24as I can and I have like uh an intense
  33. 1:27way of working so I like to basically
  34. 1:29get things done at like a fast rate so
  35. 1:32it it goes to show I guess overall just
  36. 1:35because um like people see hard work and
  37. 1:37they know you know what I mean so I
  38. 1:39guess that's helped me and I I'm very
  39. 1:41like an organized person so for me
  40. 1:43personally I just like to have
  41. 1:45everything organized and I think that
  42. 1:46helped me along the way so so you're a
  43. 1:50fast-paced learner an aggressive learner
  44. 1:52you want to learn new things and
  45. 1:53challenge yourself definitely I mean I
  46. 1:55feel like once I like have an idea of
  47. 1:57something I need to know like every way
  48. 2:00of everything about it you know what I
  49. 2:02mean so like I don't know for instance
  50. 2:05some of the machines there like it was
  51. 2:07It was kind of tough in the beginning as
  52. 2:08far as like a mechanic but like just
  53. 2:10getting the understanding of the
  54. 2:11machines from like just the basics you
  55. 2:13know and then um just working out so
  56. 2:16it's like I I wanted to learn the basics
  57. 2:17and then learn everything about it in
  58. 2:19the mechanical way electrical way just
  59. 2:22every way possible so and you have a ton
  60. 2:25of experience in so many different
  61. 2:27Departments of aono Pac so how do does
  62. 2:30that shape your decisions as plant
  63. 2:32manager um I think it helps me all
  64. 2:35around just because going from the very
  65. 2:37bottom working my way up you get to work
  66. 2:40basically in every role all the way to
  67. 2:43where I am now so I've done basically
  68. 2:44every job in the facility and then
  69. 2:48worked off of that so you learn a little
  70. 2:49bit each way so I feel like I've gained
  71. 2:52a lot just from going in small steps you
  72. 2:56know what I mean so like those small
  73. 2:57steps just put me where I'm at and it's
  74. 2:59taught me a lot about everything through
  75. 3:01the company so it's been beneficial
  76. 3:03definitely I mean if there was someone
  77. 3:05that started new here and needed to
  78. 3:08learn I would say start from the bottom
  79. 3:10and work your way up so that's makes it
  80. 3:13makes a lot of sense uh that pathway I
  81. 3:16personally that's my career path too um
  82. 3:18before okano Pac and here in the company
  83. 3:21just trying to make sure I get involved
  84. 3:23in all the the little projects right
  85. 3:25what might seem as small projects are
  86. 3:27very important to some of the bigger
  87. 3:29things that we work on as an
  88. 3:30organization as a company um and it
  89. 3:33helps you also identify you know the
  90. 3:36right people the people that report to
  91. 3:37you and their capabilities and how to
  92. 3:40you know grow your team and continue to
  93. 3:42develop your team definitely definitely
  94. 3:45yeah I mean for me I'm it's been a lot
  95. 3:48of people that worked here through the
  96. 3:49years with me some are still here some
  97. 3:51are not here but just from those certain
  98. 3:54people that have been here even some
  99. 3:56that have left have taught me numerous
  100. 3:58things that probably
  101. 4:00I'd love to teach others but it's just
  102. 4:02like it's a lot it's a lot of stuff that
  103. 4:03you go through working here yeah so but
  104. 4:07I mean overall it's been a whole I mean
  105. 4:11from line worker to plant manager it's
  106. 4:15been a lot of just basically learning
  107. 4:18the food safety side of everything and
  108. 4:21then um mechanical Side of Everything
  109. 4:24production side of everything um to
  110. 4:27basics of line workers also so it's just
  111. 4:30been it's been a lot but it's been
  112. 4:32awesome yeah yeah that's what's really
  113. 4:34interesting um at least my take in
  114. 4:36joining the company I know you joined
  115. 4:37the company recently as well it's just
  116. 4:40seeing that there is a pathway for
  117. 4:42people to be able to develop themselves
  118. 4:45and to develop into different roles and
  119. 4:47learn new things and help you kind of
  120. 4:49you know go through um the process of
  121. 4:51getting into different departments and
  122. 4:54you know and and I think that's unique
  123. 4:56for the company at least from my
  124. 4:57standpoint how you feel about that yeah
  125. 5:00I mean working at other places you're
  126. 5:02kind of you know streamlined into one
  127. 5:04Department um and growth is kind of
  128. 5:07capped at that area um but here you I
  129. 5:09mean if you have the motivation you
  130. 5:11could you could go anywhere yeah
  131. 5:13definitely we had the conversation with
  132. 5:14rill we had an interview with rohill our
  133. 5:16director of quality and you know he
  134. 5:18talked about um you know continuous
  135. 5:20education is very important to him on a
  136. 5:22personal level defin but it's also
  137. 5:24sharing knowledge is a big piece of it
  138. 5:26and I don't think that anybody can
  139. 5:27really grow in the company without
  140. 5:29sharing that knowledge and it sounds
  141. 5:30like you kind of had the similar you
  142. 5:32know a similar experience of people
  143. 5:34sharing their knowledge with you to help
  144. 5:36you kind of uh get into the position
  145. 5:38that you're in today definitely yeah I
  146. 5:39feel like I everybody that's helped me
  147. 5:41along the way like molded me to where
  148. 5:43I'm at today and like it's I feel like
  149. 5:46I'm learned everything because of going
  150. 5:48through those small bits and it's
  151. 5:50definitely been beneficial the whole way
  152. 5:51so it's good to actually start from the
  153. 5:54bottom cuz I know like for me personally
  154. 5:57it's been 8 years I think almost now now
  155. 5:59that I've been here so like in 8 years I
  156. 6:02know like you said just with going into
  157. 6:03a certain company sometimes you just go
  158. 6:05into your field and that's really it and
  159. 6:07I've branched out to every field in this
  160. 6:09company so it's like you get the best of
  161. 6:12everything basically the only spot that
  162. 6:14I didn't go into is like shipping so
  163. 6:16yeah but prior to I was like operating a
  164. 6:19forklift got my uh forklift
  165. 6:21certification while I was doing the
  166. 6:23floating for the production Supply so it
  167. 6:25was just like another thing that was I
  168. 6:27was like I want to basically be number
  169. 6:30one at that also every position that I
  170. 6:32go into I just try to push for number
  171. 6:34one mhm so that's awesome yeah so a big
  172. 6:38part of your job is the production
  173. 6:40schedule right can you explain you know
  174. 6:43for someone like me who doesn't really
  175. 6:45know what that is what is the production
  176. 6:47schedule and can you talk about you know
  177. 6:48key factors that you consider when
  178. 6:51planning it yeah definitely um so for me
  179. 6:53the production schedule I work with uh
  180. 6:55customer service directly and key
  181. 6:58managers basically um we work off of
  182. 7:00each other and help each other as much
  183. 7:02as we can but say if we get a new
  184. 7:04product um there's always different
  185. 7:07varies you know what I mean so if we get
  186. 7:09a new product it's a startup so
  187. 7:11basically we'll do like an FPA we have a
  188. 7:14um project manager that takes care of
  189. 7:16that side of things but um we work with
  190. 7:19each other directly to make sure that
  191. 7:20everything basically is efficient cost
  192. 7:23effective and takes care of um the
  193. 7:27customer needs however needed um I mean
  194. 7:30there's a lot of detail into that so I
  195. 7:32won't go too in depth but um just in the
  196. 7:35grand scheme of things like for new
  197. 7:36items and everything like that we just
  198. 7:38try to impress the customer as much as
  199. 7:40we can as well as just like not killing
  200. 7:43their
  201. 7:44pockets so so you mentioned that you
  202. 7:46work with other departments to pull that
  203. 7:49um you know schedule together so it's
  204. 7:51customer service that's you know the
  205. 7:53front line communication with the
  206. 7:55customer making sure that you know uh
  207. 7:57materials are going to be arriving on
  208. 7:59time time and things are going to be
  209. 8:00here that information that they provide
  210. 8:02to you is really what you use to kind of
  211. 8:04build that out but you mentioned our
  212. 8:06project manager and that's a critical
  213. 8:08piece too because that person is taking
  214. 8:10um everything and kind of making sure
  215. 8:13that we're going to be set up for
  216. 8:14Success when we do run so all those
  217. 8:17different phases you're involved in each
  218. 8:19one of those and again I think it helps
  219. 8:21um when you're building the schedule
  220. 8:23today with a customer that maybe we've
  221. 8:24had for a year by working through all
  222. 8:27those different processes and I think
  223. 8:29think it's really cool that the teams
  224. 8:30still get together even a year later um
  225. 8:34including a project manager customer
  226. 8:35service um building out a schedule are
  227. 8:37all still working on that with our
  228. 8:39quality teams and other teams within the
  229. 8:41organization that's pretty cool yeah
  230. 8:43it's awesome I mean it it's helpful
  231. 8:45because if there's any questions that
  232. 8:46are unanswered you can just shoot to the
  233. 8:48next office and luckily be able to
  234. 8:51hopefully find that answer nine times
  235. 8:52out of 10 you can so it's definitely
  236. 8:54helpful to have all office members right
  237. 8:57here with us so it's been helpful yeah
  238. 9:00that's great um so our capacity and our
  239. 9:04resources are constantly in flux it's
  240. 9:06just the nature of our business so how
  241. 9:08do you ensure that the schedule is
  242. 9:11aligned with what we currently have um
  243. 9:14so basically I work with shipping also
  244. 9:16that is another department that I work
  245. 9:18directly with they obviously have a huge
  246. 9:20handle on things like such as product
  247. 9:22cartons anything of that sort um I work
  248. 9:26basically with our shipping manager who
  249. 9:28is Millie um she gives me any
  250. 9:30information as far as incoming products
  251. 9:33um delayed products stuff like that so
  252. 9:35if we have any um issues as far as like
  253. 9:37products getting delivered to our doors
  254. 9:39she'll give me a heads up prior to
  255. 9:41she'll reach out to carriers stuff like
  256. 9:43that so um I mean she gives me Insight
  257. 9:46on all that we also have a um inventory
  258. 9:48manager Jessica who helps me you
  259. 9:50interviewed her um she helps me a lot
  260. 9:53also just giving us insight as far as
  261. 9:55like cartons how much we have on hand
  262. 9:57they have direct counts basically every
  263. 9:59day of like everything on hand
  264. 10:01everything that you need or would need
  265. 10:03for an upcoming project so if anything
  266. 10:06say um we're doing coffee cups for the
  267. 10:09next two weeks and the coffee cup labels
  268. 10:12are delayed she'll give me a heads up in
  269. 10:15advance just to say hey the carrier
  270. 10:17reached out to us we're late by a day I
  271. 10:19just figured I'd give you a heads up so
  272. 10:22don't schedule it prior to you know what
  273. 10:24I mean so like with a lot of new
  274. 10:26customers new projects they help me a
  275. 10:28lot with what I need to as far as um
  276. 10:31just basically startups you know what I
  277. 10:33mean so like a new client anything like
  278. 10:36that what do you uh like when you
  279. 10:40determine your lead times like how much
  280. 10:41time do you need um you know a new
  281. 10:44customer comes in they've run through
  282. 10:46their trial um kind of have like
  283. 10:48everything dialed in how much time do
  284. 10:51you need in order to get them on the
  285. 10:53schedule and and things like that um
  286. 10:56typically we can have it schedule in the
  287. 10:59same day you know what I mean we can
  288. 11:01make that happen relatively quickly as
  289. 11:03long as we have everything here in house
  290. 11:06and we can usually give the customer a
  291. 11:08good turnaround pretty quickly I mean
  292. 11:11say if they came to us on a Tuesday
  293. 11:13saying hey can you guys run this um
  294. 11:16within the next two days um depends on
  295. 11:20several things obviously carton shippers
  296. 11:22product um if we have everything machine
  297. 11:25availability um so obviously these are
  298. 11:27all key factors that play into planning
  299. 11:30producting you know what I mean
  300. 11:32everything like that yeah the reason I
  301. 11:34ask that is um you know with with our
  302. 11:37Workforce and um the way that we have
  303. 11:39the different people working on the
  304. 11:40lines I know that you have set this up
  305. 11:43and our teams have set this up so that
  306. 11:45we have a kind of a dynamic workflow so
  307. 11:48people can work on different lines
  308. 11:49they're trained to do different things
  309. 11:51within the facility so that gives us a
  310. 11:53lot of flexibility on being able to move
  311. 11:55things around so maybe like you said
  312. 11:57corate doesn't arrive for spefic
  313. 11:58specific project it's not like we can't
  314. 12:01run we'll put it something else in in
  315. 12:03its place so we can be very flexible uh
  316. 12:06with that
  317. 12:09definitely uh so could you share an
  318. 12:11example of what successful integration
  319. 12:13of a client looks like um yeah so
  320. 12:16basically us just getting a product from
  321. 12:18the one of our clients um basically
  322. 12:20giving them a fast turnaround I feel
  323. 12:22like all clients want to fast turnar
  324. 12:23around as much as somebody says they're
  325. 12:25not you know what customers always want
  326. 12:27in and out so people are buying goods at
  327. 12:29all times so um a successful turnaround
  328. 12:32basically would be them sending us a
  329. 12:35product in we would FPA it with our
  330. 12:37project manager um we would follow suit
  331. 12:40with that after we get the results from
  332. 12:42um our client that we're currently
  333. 12:44working with we would just go from there
  334. 12:46um if pending if they said no negative
  335. 12:49we wouldn't run it um nine times out of
  336. 12:5110 we typically get approval so we would
  337. 12:53just take that approval put it on our
  338. 12:55production schedule and say if they put
  339. 12:58down1 10,000 cases just for the week
  340. 13:00just for instance um we would just shoot
  341. 13:02for that 10,000 for that week and then
  342. 13:04reallocate for the week after that and
  343. 13:07then basically if the customer has a
  344. 13:09higher demand amount or if he wanted to
  345. 13:12increase decrease we would work with the
  346. 13:14customer as needed from there basically
  347. 13:17um anything as far as like in andout if
  348. 13:20they wanted a new project obviously we
  349. 13:22have our customer service department
  350. 13:23that can just help us navigate us
  351. 13:25through that and then um for me I just
  352. 13:27put it on a production schedule and then
  353. 13:30work with the maintenance team to make
  354. 13:31sure that we have a quick turnaround
  355. 13:33yeah yeah I try with uh with new clients
  356. 13:36new customers when I'm bringing them
  357. 13:38into it right so I'll work on a quote
  358. 13:41for a for a customer they accept the
  359. 13:43quote they're excited to start working
  360. 13:44with us and like you said everybody
  361. 13:45wants everything instantaneous right y
  362. 13:48um but there is a process that we have
  363. 13:49to go through so we have to do our Sops
  364. 13:52with our project management group our
  365. 13:54quality director getting all those
  366. 13:56documents in line understanding a m
  367. 13:58material schedule so that we're have our
  368. 14:00shipping and receiving department
  369. 14:02understands when it's going to come in
  370. 14:03um and I think all of those things kind
  371. 14:05of play a critical um piece to building
  372. 14:08out a schedule and a lot of clients you
  373. 14:11know we we ask right we say hey we'd
  374. 14:13like to have a forecast and some
  375. 14:15customers are hesitant to give us a
  376. 14:17forecast um because they're not exactly
  377. 14:19sure they're working with us because of
  378. 14:20our flexibility but the benefits of when
  379. 14:23they provide that forecast to us so that
  380. 14:26we can build a schedule around it allows
  381. 14:28us to allocate our equipment right
  382. 14:30allows you to determine how many people
  383. 14:32are going to be needed for each one of
  384. 14:33those projects how we're going to build
  385. 14:35those into the schedule and I think that
  386. 14:37gives us the best success and um you
  387. 14:39know trying to show our customers that
  388. 14:41had the importance behind a forecast and
  389. 14:44allowing you to build your attainment
  390. 14:45schedule with our teams definitely yeah
  391. 14:49I agree with that um I have a question
  392. 14:51just for myself but so we run sellable
  393. 14:54trials right yes um are you involved in
  394. 14:57that like is that part part of your
  395. 14:59production schedule um so basically
  396. 15:01again I'd work with one of our project
  397. 15:03managers just he would present it to me
  398. 15:07um he would shoot ideas from hey this is
  399. 15:09the product we're doing this is the
  400. 15:11machine we're using um just basically
  401. 15:13get my insight on it and then um we
  402. 15:16would work off each other and then plan
  403. 15:18it from there I would basically since we
  404. 15:20do it um first second and third shift I
  405. 15:23would either schedule it one of those
  406. 15:25shifts and then just go from there with
  407. 15:27the project manager okay
  408. 15:29yeah and having those meetings too to to
  409. 15:31support what you're saying about a
  410. 15:32sellable trial and an FPA right a first
  411. 15:35production um we have our weekly
  412. 15:37meetings which we recap all of the data
  413. 15:40so each of the Departments comes in and
  414. 15:42reports you know uh from their angle so
  415. 15:45our quality team reports like hey these
  416. 15:47are the call outs these are the things
  417. 15:48that we've seen um maintenance will say
  418. 15:51you know hey this was what we had to do
  419. 15:53with the equipment to dial it in we had
  420. 15:55to you know make some different
  421. 15:57modifications and changes to it um you
  422. 15:59know our shipping Department hey this is
  423. 16:01the way we had to um you know stage uh
  424. 16:04the inventory and how we're going to use
  425. 16:05it you know so it's really cool how all
  426. 16:08of our teams come together for those
  427. 16:09weekly meetings and I they're highly
  428. 16:11productive um and I love the fact that
  429. 16:13everybody comes to the table and Patrick
  430. 16:15organized you organize those meetings um
  431. 16:18and everybody comes to the table with
  432. 16:19their piece and then I think that
  433. 16:21probably helps you then build a schedule
  434. 16:25and build a process around it with your
  435. 16:27team right yeah definitely I mean the
  436. 16:29meetings that we do have here are
  437. 16:30beneficial for sure just because it's
  438. 16:32like um live time it's always real time
  439. 16:35we're working quickly every day
  440. 16:37different products different there's
  441. 16:39four different things that go into one
  442. 16:41item and if you miss one of those things
  443. 16:43then you're down you know what I mean so
  444. 16:45like you definitely have to pay
  445. 16:46attention to that so it's great that we
  446. 16:48have our meetings that we do have just
  447. 16:50because every single person that we need
  448. 16:53is on there managers supervisors and if
  449. 16:55there's a call out it's it's ready to be
  450. 16:58called out out so I think those are key
  451. 17:00definitely our meetings so so tell us
  452. 17:04what you like to do outside of a counter
  453. 17:05pack um well when I'm not hanging out
  454. 17:08with a bunch of people that do work here
  455. 17:10no um me personally I'm uh more of an
  456. 17:14outdoor person I like to fish um go
  457. 17:17camping um I have a boat so I like to go
  458. 17:20on my boat um I actually just purchase
  459. 17:23land so I like I'm a Hands-On kind of
  460. 17:25guy so I like to clear land I like to
  461. 17:27basically get down and dirty so anytime
  462. 17:30I'm not here I'm outside fishing or
  463. 17:32working on something else that's not
  464. 17:35relative to this but um for me it's just
  465. 17:38outside it's a nice Escape yeah exactly
  466. 17:41outside is my my thing you know what I
  467. 17:43mean if if cuz I guess we're like kind
  468. 17:45of cooped up in here so me personally
  469. 17:48even with the windows I need fresh air
  470. 17:50so I'm a big fresh air kind of guy so
  471. 17:52outside of here you'll catch me outside
  472. 17:56awesome well thank you for joining us
  473. 17:58today Patrick we really appreciate it
  474. 18:00thank you guys I appreciate you having
  475. 18:01me all
  476. 18:06right

About this transcript

This page contains the full transcript of Production Scheduling with Plant Manager Patrick Sullivan by Econo-Pak Food Packaging Specialists, generated from the public captions YouTube serves with the video. The transcript has 3,522 words across 476 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, caption language selection, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.