  1. 0:00welcome to the lecture series of basic
  2. 0:02civil engineering
  3. 0:04in this lecture we are going to learn
  4. 0:06about primary Division and principle of
  5. 0:10serving
  6. 0:11so let us start with outline of the
  7. 0:13session
  8. 0:15in this session we are going to learn
  9. 0:18primary division of serving and
  10. 0:22we will learn about fundamental
  11. 0:24principle of serving so let us start
  12. 0:27with primary division of surveying
  13. 0:30basically there are two division of
  14. 0:33serving first is clean serving and
  15. 0:35geodetic serving
  16. 0:37let us start with the plane surveying
  17. 0:40the survey in which Earth is assumed to
  18. 0:43a plane and the curvature of Earth is
  19. 0:47ignored it is called plane serving
  20. 0:50geodetic survey is the survey in which
  21. 0:52the earth's surface is assumed as a cow
  22. 0:56surface as it is we know that the shape
  23. 1:00of Earth is parallel so when such shape
  24. 1:04of Earth is considered and Survey is
  25. 1:07conducted that is called geodetic survey
  26. 1:10so in geodetic survey we considered the
  27. 1:13cow surface of Earth
  28. 1:15in plane serving we ignored such
  29. 1:19curvature of Earth
  30. 1:22the plane survey extended over the small
  31. 1:25areas and the geodetic survey is
  32. 1:29extended over the large area
  33. 1:32as in the plane surveying it is
  34. 1:35conducted over the small area the line
  35. 1:37connecting any two point on the surface
  36. 1:40of Earth are considered as straight line
  37. 1:43whereas in geodetic survey the line
  38. 1:46joining any two station on the surface
  39. 1:50of Earth is considered as Cloud line
  40. 1:54in plane serving any triangle means if
  41. 1:57we connect any three point the triangle
  42. 2:00form is considered as a plane triangle
  43. 2:03whereas in geodetic survey
  44. 2:07the triangle are considered as
  45. 2:10spheroidal triangle as you can see here
  46. 2:14when the surface area is less than 250
  47. 2:17kilometer Square it is considered as
  48. 2:19plane serving and we do not consider the
  49. 2:23curvature shape of Earth but when the
  50. 2:26area to be surveyed is more than 250
  51. 2:30kilometer Square in that case will
  52. 2:33conduct geodetic survey plane survey are
  53. 2:36used for layout of Highway Railway
  54. 2:40Canal fixing the boundary of pillars
  55. 2:43construction of bridges Factory
  56. 2:46etcetera whereas the geodetic survey is
  57. 2:50used for preparing the map of a larger
  58. 2:56area like preparing the map of state
  59. 3:00preparing the map of country preparing
  60. 3:02the map of continent so this is about
  61. 3:05primary division of survey now let us
  62. 3:08move to next topic that is fundamental
  63. 3:11principle of serving two basic principle
  64. 3:14of serving are there first always work
  65. 3:18from Whole to part and the second
  66. 3:22to locate the new position by at least
  67. 3:24two measurement from fixed reference
  68. 3:27point
  69. 3:29so let us see one by one
  70. 3:31first principle is always work from
  71. 3:35Whole to path
  72. 3:37this is the main principle of serving
  73. 3:40achieve this in actual field
  74. 3:43a sufficient number of primary control
  75. 3:45Point are established with very high
  76. 3:49Precision in around area to be surveyed
  77. 3:53like here
  78. 3:55p q and R are established with very high
  79. 4:00accuracy and with very precise equipment
  80. 4:03after that the minor control Point here
  81. 4:07we can see a b and c
  82. 4:11are located between the primary control
  83. 4:14point and
  84. 4:16this point are established with less
  85. 4:19precise method
  86. 4:20further
  87. 4:22details our survey means M and O which
  88. 4:26are interior detail
  89. 4:28these are surveyed with reference to
  90. 4:31minor control Point by adopting any one
  91. 4:34of the method of serving
  92. 4:37the main idea of working from Whole to
  93. 4:40part is to minimize the error
  94. 4:44it prevents the accumulation of error
  95. 4:47and
  96. 4:48it localized the Minor error within the
  97. 4:52frame out of control point on other hand
  98. 4:55if we work the reverse principle means
  99. 4:58to work from part to Hall the error
  100. 5:01would be expand greater magnitude and
  101. 5:04the scale of survey will be distored
  102. 5:07beyond the control
  103. 5:10in general practice area is divided in
  104. 5:14large triangle here I have shown only
  105. 5:16one but the complete area are divided in
  106. 5:20many triangles
  107. 5:22and positions of their vertices are
  108. 5:25surveyed with the grid accuracy using
  109. 5:28very sophisticated instrument these
  110. 5:30triangles are further divided into
  111. 5:33smaller triangle and the vertices are
  112. 5:37surveyed with less accuracy
  113. 5:39so this is the first and important
  114. 5:42principle of working from Hall to part
  115. 5:44now let us learn the second one
  116. 5:48that is to locate a new position of any
  117. 5:52stations by at least two measurement
  118. 5:55from fixed reference point
  119. 5:59so here A and B are the reference fixed
  120. 6:02reference point and we want to locate
  121. 6:05the point C so first method is to take
  122. 6:09the linear measurement of C point from a
  123. 6:12and b means major distance AC and BC
  124. 6:18the next method the C Point can be
  125. 6:21located by taking linear measurement in
  126. 6:24perpendicular Direction
  127. 6:27the next one we can locate the C Point
  128. 6:31by taking linear measurement from any
  129. 6:34one station means station b means we can
  130. 6:37measure the length BC and the angle
  131. 6:40angular measurement is taken means the
  132. 6:43angle ABC is measured
  133. 6:47in the next method we cannot take any
  134. 6:50linear measurement but C point is
  135. 6:53located by taking two angles means angle
  136. 6:57c a b and angle a b c
  137. 7:03in the next method
  138. 7:05the C point is located by one linear
  139. 7:08measurement and opposite angle can be
  140. 7:10measured so by any of the method we can
  141. 7:14locate the new point which takes minimum
  142. 7:18to measurement so that the fixed
  143. 7:21reference point can fix accurately
  144. 7:25so these are all about
  145. 7:27primary division of serving and
  146. 7:29principle of serving thank you very much
  147. 7:31for watching this video if you have any
  148. 7:34doubt or query please write in the
  149. 7:36comment box I will be there to help you
  150. 7:39thank you thank you very much

About this transcript

This page contains the full transcript of Primary Division and Principle of Surveying by Engineering Funda, generated from the public captions YouTube serves with the video. The transcript has 926 words across 150 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.