Planning High Court Challenges webinar session 1: Planning and environmental issues — Transcript
Full transcript
- 0:00Welcome to Landmark Chambers uh webinar
- 0:02planning by court uh challenges uh
- 0:05session one which is covering uh
- 0:07planning and environmental issues. Uh
- 0:10we're delighted um so many of you could
- 0:12join the session today and we hope you
- 0:15find the presentations to be useful. Um
- 0:17this is as I think Richard Turney
- 0:19remarked on LinkedIn uh possibly the
- 0:2218th year that we have run um this
- 0:24seminar now uh webinar um and uh I'm
- 0:28glad so many of you still find it uh
- 0:30useful. Um my name is um James Marici um
- 0:35Kings Council um and I'm going to chair
- 0:38the session today uh joined by a number
- 0:40of my colleagues who I'm going to
- 0:41introduce to you formally uh in a
- 0:43moment. Uh first of all um Ben who's
- 0:46going to be dealing with uh recent
- 0:48habitats case law. Uh Ben specializes in
- 0:51planning, public and environmental law.
- 0:53Uh he's ranked for planning and
- 0:54administrative law by uh chambers and
- 0:56partners and as a leading uh junior in
- 0:58legal 500. Um he um he's also on the
- 1:02attorney general's a panel of council
- 1:04and he regularly appears in the high
- 1:06court and the court of appeal uh on
- 1:08behalf of environmental campaigners,
- 1:10residence groups, developers, local
- 1:12authorities and the secretary of state.
- 1:15Uh Nick uh is going to be dealing with
- 1:17SEA and EIA case law. Uh Nick's a
- 1:20planning and environment specialist. Uh
- 1:22he he was Planning Magazine's top junior
- 1:24barrista and top junior barristister
- 1:26under 35 in 2026. Um and he's ranked in
- 1:30both chambers and partners and legal 500
- 1:32for planning and environment. Uh his
- 1:34cases include cases such as uh Finch and
- 1:36Fry in the Supreme Court CPR Kent on the
- 1:41scope of the new AM duty uh and Rotham
- 1:44and Mole Valley on the approach to gray
- 1:46belt and and and green belt and his
- 1:48policy work includes having advised the
- 1:51government on the uh MPPF uh versions
- 1:5423, 24 and 26.
- 1:57Um Margarita is dealing with climate
- 2:00change litigation in the in in the high
- 2:02court. Um Margarita specializes in
- 2:04environmental law with a particular
- 2:06focus on climate related issue and human
- 2:08rights. Um she's ranked in chambers and
- 2:10partners and and shortlisted in this
- 2:12year's planning and environment genius
- 2:13category. um on she's on the attorney
- 2:16general uh C panel uh of public
- 2:19international law and on the equality
- 2:21human rights um commission panel and she
- 2:24practices in public law and
- 2:25environmental group claims domestically
- 2:27and is impered in most of the cl uh the
- 2:29climate proceedings before the ICJ uh
- 2:33and uh regional human rights uh courts.
- 2:36Um Odet is dealing with section 106 uh
- 2:39high court case law. Odette specializes
- 2:42in planning and environmental law. She's
- 2:44ranked by legal 500 in chambers and
- 2:46partners as one of the top planning
- 2:47juniors by planning magazine. She's also
- 2:49on the attorney general C panel and she
- 2:51regularly appears in the high court and
- 2:53court of appeal and at planning
- 2:54inquiries and hearings.
- 2:56Um and then uh finally uh Poppy um who's
- 3:00going to be uh talking to us about the
- 3:02uh environmental principles in the
- 3:04environment act and their and their
- 3:05application in planning high court
- 3:07cases. Uh Poppy specializes in planning
- 3:09and property law, particular interest in
- 3:12the overlap between those two areas. She
- 3:14regularly appears at planning inquiries
- 3:16um and she has recently been involved in
- 3:19a high-profile judicial review led by
- 3:21Richard Turning involving a significant
- 3:24uh um infrastructure project. Um and uh
- 3:28she is a writer for the um J um JPL
- 3:31JPEL. Um so um those are our speakers.
- 3:35Um and uh without any uh further delay,
- 3:39I'm going to hand you over to our first
- 3:41speaker. Um that's Ben.
- 3:44>> Uh good morning everyone. Um as you can
- 3:47see from the very long title, I'm talk
- 3:48to you about habitats regulations. I'm
- 3:51going to start with in fact most of my
- 3:53time will be taken up with a a review of
- 3:55the year in terms of significant
- 3:57judgments on the habitat's regulations
- 3:59and then I will end unless I get red
- 4:01carded with uh a look forward to
- 4:04potential challenges to um uh measures
- 4:08made under the uh the relatively new
- 4:10planning and infrastructure act. So um
- 4:13hoping I can now control the slides.
- 4:16There we go. Um, so these are the five
- 4:18cases I'm going to be uh talking to you
- 4:21about. They've been handed down since
- 4:22October of last year. And I'll start off
- 4:25with um there's a sort of timeline of
- 4:28them. Um I'll start off with uh CG Fry
- 4:31and Sons. So this was Judgment Handed
- 4:34down in October of last year. So it may
- 4:36well have featured in last year's um
- 4:39last year's roundup as well. But since
- 4:42given its significance, I thought it's
- 4:43worth worth just touching on again. A
- 4:46number of you probably now familiar with
- 4:48the issues in that case, but it it
- 4:50concerned a large mixeduse development
- 4:52in Somerset. Um an outline planning
- 4:54permission was granted in 2015. Reserve
- 4:57matters approval for phase three of the
- 4:59project approved in 2020 subject to
- 5:02various conditions um relating to the
- 5:04need to for the council approved details
- 5:06of things like surface water, drainage,
- 5:08construction, environment management
- 5:09plan, etc. The site was in the river
- 5:11tone which feeds into the Somerset
- 5:13levels rams site and after the reserve
- 5:16matters approval natural England
- 5:19published its guidance on nutrient
- 5:20neutrality which I'm sure you're all
- 5:22familiar with but the effect was that of
- 5:24that was that local planning authorities
- 5:26were advised to take a a nutrient
- 5:28neutral approach development. So
- 5:30development shouldn't be approved if it
- 5:31was going to increase the um level of
- 5:34nitrates or phosphates in the protected
- 5:36sites.
- 5:38Um so the council refused to discharge
- 5:41the conditions on the basis of the
- 5:42absence of an appropriate assessment
- 5:44showing nutrient neutrality would be
- 5:46achieved. Um the developer appealed for
- 5:48non-determination. A planning spectre
- 5:51agreed with the local council,
- 5:52determined that what was then paragraph
- 5:54181 of the MPPF um which afforded RAMs
- 5:57sites equivalent protection to other
- 5:59European sites um applied at the
- 6:02condition approval stage to require
- 6:03appropriate assessment and that the
- 6:06interpretation of Habitat's regulations
- 6:07post Brexit still fell to be carried out
- 6:10in light of the Habitat's directive and
- 6:12CJU case law. That was challenged in the
- 6:15high court. It eventually reached the
- 6:16Supreme Court which looked at two
- 6:17issues.
- 6:19So the first uh was whether appropriate
- 6:22assessment was required before the local
- 6:24planning authority decides uh to
- 6:25discharge conditions at reserve matters
- 6:27stage and the second was the effect of a
- 6:30grant of outline planning permission and
- 6:32the impact of the policy protection
- 6:34given to Ramsar sites. And so in
- 6:36relation to um issue one
- 6:40uh you can see that um the habit the
- 6:43court found the habitats regulations
- 6:45full to be interpreted in line with the
- 6:46CJU case law before Brexit the directive
- 6:50and its intention and um the overall
- 6:54purpose was to provide a high degree of
- 6:56protection for vulnerable habitats and
- 6:58sites. that regulation 63 used
- 7:00deliberately broad language um and to
- 7:04make a uh and to hold that um it wasn't
- 7:08necessary or it wasn't possible to to
- 7:10require appropriate assessment at the
- 7:13reserve matter stage that that could
- 7:14only be carried out at the with a formal
- 7:16grant of planning permission would
- 7:19defeat the purpose of the habitat's
- 7:20regulations. Um, interestingly, the
- 7:23court made no finding on the question of
- 7:25whether it was necessary to conduct a
- 7:27habitat's regulations assessment at the
- 7:30earliest opportunity as it is with EIA.
- 7:32So, it left that question open. Um, in
- 7:36issue two, it actually allowed the
- 7:37appeal on on issue two. So, at the time,
- 7:40the uh uh the Ramsar site was only
- 7:43protected by virtue of policy in the
- 7:45MPPF that said it should be treated as
- 7:47if it were protected by the habitat's
- 7:49regulations. the MPPF as a material
- 7:52consideration at the time of granting
- 7:53planning permission. But the court said
- 7:55that relationship between the MPPF and
- 7:58the and the development fundamentally
- 7:59changed once planning permission had
- 8:01been granted. Once planning permission
- 8:03been granted, there was a right granted
- 8:05to develop the land um which was not
- 8:07made defeasible depending on government
- 8:09policy. So where outline permission is
- 8:12granted, it's not open to a planning
- 8:13authority to revisit matters which have
- 8:15been approved in principle at the
- 8:17outline stage and some element of
- 8:19development must be acceptable within
- 8:21the ambit of the outline permission and
- 8:23in this case and that's not what
- 8:25happened since um the council had
- 8:28approved but then natural England's
- 8:30guidance had changed. Um but as a matter
- 8:32of policy that the court found um was
- 8:35not something that could stand in the
- 8:37way of development at all uh of the
- 8:40site. Um
- 8:42and so whilst issue two is of widest
- 8:44interest regarding the extent to which
- 8:46planning authorities are entitled to
- 8:47refuse applications to discharge
- 8:49conditions um the particular relevance
- 8:52in relation to rams sites is now
- 8:53slightly academic or entirely academic
- 8:55because schedule six of the planning and
- 8:57infrastructure act has now afforded them
- 8:59equal protection as a matter of law to
- 9:01other habitats regulation sites. So
- 9:03that's uh CG fry. Um next case is beyond
- 9:08GM.
- 9:09Um so this was a case uh relating to um
- 9:13precision bred organisms or PBOS's which
- 9:17are modifi which are organisms modified
- 9:19using modern biotechnology in a way
- 9:21which is stable which could have arisen
- 9:23through traditional breeding. Um the
- 9:26genetic technology precision breeding
- 9:28act 2023 created a regulatory pathway
- 9:31for PBOS's in England which was separate
- 9:34from and was a lighter touch regime from
- 9:36that which applied to genetically
- 9:37modified organism controls and the act
- 9:41gave the secretary of statewide powers
- 9:43to regulate PBO food and feed marketing
- 9:46by way of secondary legislation.
- 9:49Uh and um
- 9:53so uh section 26 of that act conferred
- 9:56general marketing power and section 262B
- 9:59expressly permitted requirements to be
- 10:00imposed for the purposes of securing the
- 10:02traceability of PBO food. Um
- 10:07before that all PBO food incl all
- 10:10genetically modified organisms including
- 10:12PBOS had to have a label identifying
- 10:14them as such. That's no longer the case.
- 10:16So these this um was implemented by the
- 10:18genetic technology precision and
- 10:20breeding regulations 2025 and they
- 10:23established a food and feed
- 10:24authorization framework administrated by
- 10:26the food standards agency and as I said
- 10:29they um did not impose any mandatory
- 10:31labeling requirements on PBO and food
- 10:34and feed. that was challenged by the
- 10:36claimants in that case. That challenge
- 10:38on several grounds and one of these was
- 10:39that the 2025 regulations amounted to a
- 10:42plan or project for the purposes of
- 10:44regulation 63 of the habitats
- 10:46regulations assessment and that
- 10:48therefore there had been a failure to
- 10:50carry out appropriate assessment. The
- 10:52court found that in principle secondary
- 10:54legislation could be a plan or project.
- 10:56Um the concept is a functional one. It
- 10:59doesn't depend on the in instrument that
- 11:01gives rise to it. Um but there are
- 11:05limits and the mere fact that the
- 11:07measure is likely to have a significant
- 11:08effect on an environmental side doesn't
- 11:11mean it's a plan or project. The court
- 11:13said the outer limits can be derived
- 11:14from the language of article 63 of the
- 11:16habitat's directive. The obligation
- 11:18imposed by that provision is to conduct
- 11:20an appropriate assessment of the
- 11:22implications of the plan or project for
- 11:24a European site in view of its
- 11:26conservation objectives. It follows the
- 11:28concept of a plan or project presupposes
- 11:30a measure whose implications for a year
- 11:32site are capable in principle of such
- 11:34assessment. Accordingly, although the
- 11:36concept is to be construed broadly and
- 11:37purposively, it doesn't extend to the
- 11:39measures which lack sufficient precision
- 11:42or any discernable linkage to particular
- 11:44sites such that the implications for
- 11:47those sites uh can't be meaningfully um
- 11:50assessed. So it it's a and it dismissed
- 11:54the idea that the habitat's regulations
- 11:56did apply here. There's a good case on
- 11:58just understanding
- 12:00if you like the limits of that concept
- 12:02of plan or project and in this case the
- 12:05regulations were outside of the limits
- 12:06although it's worth noting that claim
- 12:08did succeed uh on other grounds. Um so
- 12:13next we turn to the um uh the British
- 12:16Association for Shooting and
- 12:18Conservation. I think that's one of
- 12:19James's um many victories. Um this was a
- 12:24challenge uh by the British Association
- 12:26for Shooting Conservation to certain
- 12:28conditions which Natural England had
- 12:29imposed on licenses for releasing
- 12:32feeasants and partridges near um spas.
- 12:34So European sites. In essence, since
- 12:382021, section 14 1B of the Wildlife and
- 12:42Countryside Act 1981 made this an
- 12:45offense to release feeasants and parters
- 12:47into the wild. Uh but section 16 gives a
- 12:50power to issue a license uh which if
- 12:52adheres to disapplies the criminal
- 12:54offense. So quite familiar um regime in
- 12:57in the habitat's world. Um section uh 16
- 13:02of the wildlife and countryside act um
- 13:04provided that licenses could be subject
- 13:05to compliance with specified conditions
- 13:09and um natural England imposed a
- 13:11condition restricting the keeping of
- 13:13feeasants and partridges in control
- 13:15zones being spas in a 15 me buffer zone
- 13:18from them and the purpose of that was to
- 13:20to reduce the risk of bird flu
- 13:21transmissions. Um the claimant submitted
- 13:24that the condition went beyond the
- 13:26statutory purpose of section 14 because
- 13:28that only dealt with the release or the
- 13:29escape of birds not their keeping.
- 13:32Natural England argued among other
- 13:34things that section 14 needed to be
- 13:36interpreted in light of the habitat's
- 13:38regulations uh under which it had a duty
- 13:40to exercise functions which are relevant
- 13:42to nature conservation so as to secure
- 13:45compliance with the requirements of the
- 13:46directive and the wild birds directive.
- 13:49Um
- 13:50the court um allowed the claim. It
- 13:54confirmed that the environmental
- 13:56protections under the habitats
- 13:57regulations don't confer any additional
- 13:58licensing powers beyond those authorized
- 14:00by the relevant uh legislation.
- 14:04The court said in my judgment the
- 14:05habitat's regulations do not affect the
- 14:07proper interpretation of section 14.
- 14:09They both have the same narrow purpose
- 14:11but the regulations cannot widen or
- 14:13enhance the scope of criminality under
- 14:15section 14. the EU directives no longer
- 14:17have any relevance. In addition, there
- 14:19is no duty to interpret domestic law
- 14:21consistently with EU law. The principle
- 14:23of supremacy um has been uh repealed.
- 14:28So a helpful case there about the
- 14:30interaction if you like between uh the
- 14:32ongoing duties particular natural the
- 14:35habitats regulations and other um
- 14:37licensing regimes. The next case is
- 14:40staunch campaign uh limited.
- 14:44Um so in that concerned a warehouse
- 14:46development on land which was
- 14:48functionally linked to an SPA. The
- 14:51developer identified an alternative site
- 14:53as a replacement to to if you like to
- 14:55replace the loss of functionally link
- 14:57land and an appropriate assessment was
- 14:59carried out which concluded that the
- 15:01loss of that land would um
- 15:05have an adverse effect but that
- 15:07replacement of the land was appropriate
- 15:10uh mitigation. The planning commission
- 15:12was granted. Um that decision was
- 15:14challenged by the claimant which argued
- 15:16that the council failed to consider
- 15:17whether the replacement land was
- 15:19genuinely mitigation or whether it was
- 15:21in fact compensation and if it was cons
- 15:24compensation that would have engaged the
- 15:25derrigation provisions the OPI
- 15:27provisions in regulation 64 of the
- 15:30habitats regulations. Um the court
- 15:34explained um that mitigation uh lessens
- 15:37the negative effects of a project with
- 15:39the aim of ensuring if possible that the
- 15:40integrity of the site is not adversely
- 15:42affected albeit that some insignificant
- 15:45and or transient effects might uh not be
- 15:48totally eliminated. Compensatory measure
- 15:50by contrast does not achieve that goal
- 15:52within the narrower framework of the
- 15:54plan or project itself. Rather, it seeks
- 15:56to counterbalance the failure to do so
- 15:58through different positive effects with
- 16:01a view to at at the very least avoiding
- 16:03a net negative effect within a wider
- 16:05framework of some description. So,
- 16:07that's quite helpful
- 16:09um guidance on the distinction between
- 16:10the two, not that it's always easy to
- 16:12identify in practice. Um it's important
- 16:15to stress the claim didn't say that the
- 16:16functioning link land was incapable of
- 16:18being a mitigation measure, just that it
- 16:20was necessary for the council to
- 16:21consider the matter. The court
- 16:23considered some of the European cases
- 16:25relied upon by the claimant including
- 16:27the Briels's case. Um it's it noted that
- 16:31those cases involved the loss of land
- 16:32within the SPA. And it said of this,
- 16:34it's important to realize that both
- 16:36Briels and Grace were cases where the
- 16:38project would involve development within
- 16:40the European site itself. In such a
- 16:42case, it's likely to be difficult in
- 16:44practice even for experts to say with
- 16:46the requisite degree of scientific
- 16:48certainty that the proposed ameliative
- 16:50measures will not affect the site's
- 16:52integrity. So the judgments need to be
- 16:54read in that light. And this case said
- 16:56the court was nowhere near the fact of
- 16:58those cases. In this case, nobody
- 17:00suggested that with the provision of
- 17:01alternative land there would be any
- 17:03significant effect on the SPA. Thus, the
- 17:06possibility that the proposed
- 17:07alternative land was compensatory didn't
- 17:09even enter the equation. The court
- 17:11placed quite significant weight on the
- 17:13advice of Natural England and it it
- 17:15rejected the claimment's contention that
- 17:16natural had just been providing high
- 17:18level advice. Um it seemed to sort of
- 17:22doubt that natural advice could ever be
- 17:23sort of treated or dismissed in that
- 17:25way. The court said the claimants
- 17:27attempt to portray natural as merely
- 17:28giving high level advice is without
- 17:30merit. Naturally as a statute consulty,
- 17:32its importance was specifically
- 17:33recognized uh by Lord Justice Sales in
- 17:36the Smith case where he held a relevant
- 17:38competent authorities entitled to place
- 17:40considerable weight on the opinion of
- 17:41natural England as the expert national
- 17:43agency. Um
- 17:46and so uh yes perhaps a salutary warning
- 17:49for claimants seeking to challenge
- 17:51decisions relating to habitats
- 17:52regulations where natural England has
- 17:53given um has given advice that it will
- 17:56be uh very very difficult. Um then
- 18:00Harris
- 18:02is a very recent judgment was handed
- 18:04down on the 9th of October. The uh the
- 18:07claimant was a couple who lived on a
- 18:09farm um in the fence took a judicial
- 18:13review against natural for the failure
- 18:14to take appropriate steps to prevent the
- 18:17pollution of catfield fen from
- 18:19agricultural runoff pursuant to its
- 18:21duties under regulation nine of the
- 18:23habitats regulations and article 62 of
- 18:25the directive. Um
- 18:28and the court considered the
- 18:29relationship between regulation 9 and
- 18:31article 62. So regulation 9 is a
- 18:34provision which places a duty on both
- 18:36the secretary of state and natural to
- 18:37exercise their functions so as to secure
- 18:41compliance with the requirements of the
- 18:42habitats uh directive. That was the
- 18:44regulation that natural was was relying
- 18:46on in the um game birds uh case that I
- 18:50described earlier. Article 62 requires
- 18:53them that they take appropriate steps to
- 18:55prevent the deterioration of European
- 18:57sites. The claimment made two arguments.
- 18:59First, the claimment argued that once
- 19:02notified um that the condition in the
- 19:05SACE, the special area of conservation
- 19:07had dropped below the requisite
- 19:08standards. Natural England had a
- 19:10discretion as to what steps to take but
- 19:13no discretion um as to the timetable in
- 19:15which to take them. But effectively the
- 19:17combination of regulation 9 and article
- 19:1962 required naturally to take immediate
- 19:22make take an immediate response and then
- 19:25the second ground which um Mrs. Justice
- 19:28Leven described as more ambitious uh was
- 19:30that the action naturally had taken was
- 19:32outside the range of reasonable
- 19:33responses. The court dismissed the claim
- 19:37on ground one. Uh the judge said the
- 19:39claimment's first limb of the ground in
- 19:41my view imposes too high an obligation
- 19:42on natural England. Um,
- 19:46council submits that natural England was
- 19:48and remains in breach of its duty under
- 19:49regulations nine and article two uh,
- 19:52article 62 as soon as it was first
- 19:54alerted to the risk of harm to the SACE
- 19:56and failed to take active steps to
- 19:58remedy the breach including by
- 19:59undertaking appropriate appropriate
- 20:01investigations. Natural England have to
- 20:03be given time to investigate the
- 20:05situation and then determine what are
- 20:07appropriate steps to take. It also fails
- 20:09to appreciate that the appropriate steps
- 20:11must necessarily include steps to
- 20:13investigate the alleged risk. There's
- 20:15therefore inevitably a spectrum of
- 20:17reasonable responses including
- 20:18investigation and assessment which will
- 20:20be highly fact specific. So naturally
- 20:22given a bit of discretion and I'm going
- 20:24to sort of now just wrap up um with a
- 20:28quick look at part three of the planning
- 20:30infrastructure act which you probably
- 20:31know creates environmental delivery
- 20:33plans and the nature restoration levy.
- 20:35Um it is likely that these will be the
- 20:37subject of litigation. Um they have the
- 20:40sort of they have so far that the steps
- 20:42towards this point have been litigated.
- 20:45Um
- 20:48we are currently I think there's one EDP
- 20:50in the course of being prepared. Um that
- 20:54has already been criticized by the OEP
- 20:57expressed some concern. and it doesn't
- 20:59yet demonstrate that intended
- 21:00environmental outcomes will be achieved
- 21:02and I would be surprised if um that
- 21:05didn't lead to uh litigation
- 21:08uh at some point in the process. It's
- 21:11not worth noting section 71 imposes like
- 21:13with many planning challenges a six week
- 21:15limit for challenges to EDPs. The second
- 21:18point I just wanted to highlight before
- 21:20I finish was um some of the secondary
- 21:23legislation implementing um these EDPs.
- 21:27say particularly the ED environmental
- 21:28delivery plans appropriate
- 21:30prioritization regulations 2026 the
- 21:32recent parliamentary committee report on
- 21:34statutory instruments has flagged these
- 21:36as being potentially ultravirus um I'll
- 21:40read what it said and then I'll conclude
- 21:41but it said that the the 2025 act um uh
- 21:46allows the secretary of state to make
- 21:47regulations setting out the appropriate
- 21:48prioritization by natural England of
- 21:50conservation measures when preparing or
- 21:52amending an EDP regulation three sets
- 21:55out which measures should be priority
- 21:57but then goes on to indicate that
- 21:58natural England should only apply that
- 22:00prioritization where they think it's
- 22:01appropriate to do so. Um and uh
- 22:06it goes on to say the department states
- 22:08that regulation 3 empowers natural to
- 22:10depart from the application of a general
- 22:12rule in a particular case where it's
- 22:14appropriate to do so and asserts that
- 22:15this is an instance of administrative
- 22:17subdelegation which doesn't require
- 22:19express authorization as it reflects the
- 22:21overall framework in part three of the
- 22:232025 act that deciding which
- 22:25conservation measures are appropriate
- 22:27for an individual EDP will be led by
- 22:29natural England. The committee
- 22:30disagrees. The enabling power expressly
- 22:32states that the secretary of state must
- 22:34make regulations setting out the
- 22:35appropriate prioritization allowing
- 22:37natural to decide whether it's
- 22:39appropriate to follow that
- 22:39prioritization is a subdelegation that
- 22:41of that legislative power.
- 22:44And so the committee says where
- 22:46parliament intends to convert a
- 22:47legislative discretion, it must do so by
- 22:49express words. There are no express
- 22:51words rebutting that presumption in
- 22:52section 639. The committee accordingly
- 22:55reports uh regulation 3 for doubt as to
- 22:57whether it was intraver.
- 22:59potential avenue for argument about
- 23:01those regulations. Um essentially what
- 23:03what this what the statute said was that
- 23:06um the central state had to basically
- 23:08make regulations about what priority
- 23:10natural English should give. So whether
- 23:11it should be avoidance over mitigation
- 23:13etc. But the regulations allowed natural
- 23:16England to exercise a discretion over
- 23:18that and those two things appear to be
- 23:19incompatible. So you know lots of
- 23:22potentially fertile ground in relation
- 23:23to the planning and infrastructure act
- 23:25and its implementation. Um and
- 23:29uh without any further ado, I'll I'll
- 23:31hand over to to Nick now.
- 23:34>> Brilliant. Thank you very much, Ben. Um
- 23:37whilst I wait to take control of the
- 23:39screen, um I'm picking up EIA and SEA.
- 23:44There haven't been many SEA cases in our
- 23:47domestic high court this year. Um there
- 23:50was one FDA court case which helpfully
- 23:54indicated that doing an EIA of something
- 23:56is no substitute for doing an SEA if it
- 23:58has to be sea and that whilst uh spatial
- 24:01development plans do require an SEA
- 24:04making a bank loan available does not.
- 24:06So I've rather left that um out for
- 24:09today. So we'll focus on EIA um starting
- 24:14with a few cases on the meaning of the
- 24:16project then some on consultation some
- 24:19handling arrangements and reasons for
- 24:20screening and then I'll come on at the
- 24:22very end to talk about EOS and where we
- 24:25are with those.
- 24:28So the first case that I want to pick up
- 24:32is Ray Shaw which is a Scottish case,
- 24:34Scottish minister's case. Um
- 24:39avid watchers may well remember lots of
- 24:42discussion about this when it was handed
- 24:44down earlier this year. Um some of the
- 24:46commentaries suggesting that the grid
- 24:49connection is that this may this shows
- 24:52grid connection must be part of any sort
- 24:54of wind farm projects. It doesn't. Um,
- 24:57this was a planning challenge to the
- 24:59planning commission without a grid
- 25:00connection. But what's important is what
- 25:02the reporter said and the reporter is
- 25:04the equivalent of the planning
- 25:05inspector. Um, and I've put that on your
- 25:08slide. Um, in effect he outlined the
- 25:12challenge that was being made. I the
- 25:13grid connection is necessarily part of
- 25:16the project and that there's been salami
- 25:17slicing. Uh, the reporter said no, it'll
- 25:21whatever will come across will be part
- 25:22will require planning permission. it's
- 25:24not part of the current proposal. Salami
- 25:26slicing is misconceived because that
- 25:28refers to an attempt to circumvent the
- 25:30objectives of the EIA directive etc. And
- 25:34it was that reasoning that was
- 25:35challenged. Um the court of session in a
- 25:38house so that's the equivalent the
- 25:41Scottish equivalent of our court of
- 25:42appeal really helpfully reviews all the
- 25:45authorities or all of the key ones from
- 25:47England and Wales from the Republic of
- 25:48Ireland one from Spain. um reiterates
- 25:51the established principle that what is a
- 25:53project is a matter for the decision
- 25:55maker but then said the reporter
- 25:58undertook the wrong task. So the task
- 26:02that's set out by case law is um set out
- 26:05in for example the the Ashurch case.
- 26:08What the reporter here had done was
- 26:10something different. So saying that for
- 26:11example the application excludes the
- 26:14connection just states a fact that's not
- 26:16a conclusion. Whether the grid
- 26:18connection will be subject to its own
- 26:20evaluation and EIA and planning
- 26:21permission also not the point. Um and
- 26:24then when there's a discussion of salami
- 26:26slicing, the reporter focused on whether
- 26:28there had been an attempt to circumvent
- 26:31the EIA regulations, but the court of
- 26:33session said that's that's the wrong
- 26:34framing. You're not looking at
- 26:35intention. You're looking at what the
- 26:37project is and whether part of it has
- 26:39been left out. So fundamentally the
- 26:42court uh quashed that particular
- 26:45permission and sent the task back to the
- 26:47reporter to look at and decide whether
- 26:51it is part of the project or not. So an
- 26:54important and handy principle uh handy
- 26:56case both a because it summarizes all of
- 26:58the uh relevant principles in terms of
- 27:01what you need to be looking for for
- 27:02whether something's part of the project
- 27:04um but also I think important to corre
- 27:06correct some of the misframing that's
- 27:08happened um as this judgment has been
- 27:11discussed.
- 27:12Now contrast that with the Shell case.
- 27:15So another Scottish case um Shell owned
- 27:19a gas pipe that crossed a quarry.
- 27:22The quarry had obtained planning
- 27:25permission to extend itself. That was
- 27:29subject to two conditions which related
- 27:31to relocation of the gas pipe. The
- 27:34quarry then obtained
- 27:37under the Scottish equivalent of section
- 27:3873 permission for that same extension
- 27:41but without complying with those
- 27:42conditions. Um the EIA for that purpose
- 27:45only contained a high level assessment
- 27:48an indicative route of where the gas
- 27:50pipeline may be relocated to. It didn't
- 27:54uh actually assess the route of
- 27:56relocation or the environmental impacts
- 27:58thereof. Um
- 28:02the claimant sought to review that. the
- 28:05claimant, I think in this case being
- 28:06Shell, who owns the pipeline, um arguing
- 28:10first that relocation was part of the
- 28:12project and therefore there was a racial
- 28:14mistake, racial being the case we've
- 28:15just looked at, and also that it was an
- 28:17indirect but inevitable effect and
- 28:19therefore needed to be assessed, which
- 28:20was the Finch case.
- 28:23Background was dismissed. Um I haven't
- 28:26put the reporter's notes on the slide,
- 28:28but effectively the court looked at what
- 28:30the reporter had done. he decided that
- 28:33high level assessment was sufficient. Um
- 28:35the precise effect couldn't in fact be
- 28:37known until a new route was determined.
- 28:40The reporter decided the new route
- 28:41wasn't part of the proposals and that
- 28:44was fundamentally a a judgment that was
- 28:46open to him. The EIA and supplemental
- 28:50info did what it was possible to do i.e.
- 28:52assess what it was possible to assess
- 28:54assess at this point but fundamentally
- 28:56it had been looked at properly by the
- 28:57reporter which is where the contrast is
- 29:00with the ray shore case.
- 29:03One final point um on the scope of the
- 29:06directive um
- 29:08reiterating this a woon region case is
- 29:11CJU case but it reiterates something
- 29:12that we've taken for granted for a
- 29:14while. This was a challenge to a descend
- 29:16to decision to extend the life of a wind
- 29:18farm. There was no public participation.
- 29:20The CJU held that was not a breach of
- 29:22the EIA directive. Um because it's
- 29:25apparent from the case law that simply
- 29:26renewing an existing permit to operate
- 29:28an installation cannot in the absence of
- 29:31works or interventions be classified as
- 29:33a project. Um the court in that case
- 29:35does go on to say it was um in breach of
- 29:37various ARHUS obligations and obviously
- 29:39ARUS is directly incorporated into EU
- 29:42law in a way that it's not here but for
- 29:44EIA purposes a helpful reminder albeit
- 29:47in a CJU post implementation period case
- 29:50that simply extending the life of a
- 29:52project doesn't require EIA.
- 29:56So moving on to our next theme which is
- 29:58reconultation and I'm picking up here
- 30:01the
- 30:02judicial review challenge to the new A5
- 30:04western transport corridor in Ireland.
- 30:08There were a lot of grounds put in this
- 30:10var variously focusing on climate change
- 30:12and carbon impacts. Um, one of them
- 30:18concerned EIA and fundamentally there
- 30:20had been an environmental statement and
- 30:22an EIA in EIA work done assessing
- 30:26greenhouse gas impacts.
- 30:28The objectives before the planning
- 30:30appeal commission said no no but what
- 30:31you haven't done is looked at um the
- 30:34impact of induced north south border
- 30:39traffic i.e. what will what traffic will
- 30:43this induce going north and south of the
- 30:45border between Northern Ireland and the
- 30:46republic um and assess the climate
- 30:49impact on those. The planning appeal
- 30:51commission had recommended that further
- 30:54work be done and be published and that
- 30:57further work was done and was published
- 30:58but wasn't consulted on. Um and the high
- 31:01court in that case in Northern Ireland
- 31:03agreed said it was new environmental
- 31:05information which should have been made
- 31:06publicly available and consulted on.
- 31:08They appealed to the Northern Ireland
- 31:10Court of Appeal.
- 31:12Uh they being the the Department for
- 31:14Infrastructure. Now the Northern Ireland
- 31:16Court of Appeal allowed the appeal.
- 31:18Article six of the EIA directive um
- 31:21requires the public to be given early
- 31:23and effective opportunities to
- 31:24participate. The EA itself was
- 31:27sufficient. The planning appeals
- 31:28commission had found that.
- 31:30who also uh in an entirely practical and
- 31:34sensible judgment said well the planning
- 31:37appeal commission has already found a
- 31:38vast adverse impact due to greenhouse
- 31:41gas emissions the new information isn't
- 31:44going to change that um all the PAC had
- 31:47suggested was requiring further
- 31:49publication of stat statistics and that
- 31:52was fundamentally done you know the
- 31:54justification for this scheme had never
- 31:56been on climate change grounds the
- 31:57justification for this scheme had been
- 31:58on highway safety grounds
- 32:00So fundamentally the court of appeals
- 32:02said there's been considerable
- 32:04consultation. There's been a lot of
- 32:05engagement on the question of GHG
- 32:07emissions. This wasn't a new issue left
- 32:10out of account unlike for example and
- 32:11this is that's the basis on which they
- 32:13distinguish Finch. Um and so
- 32:16fundamentally the court of appeal
- 32:17overturned the high court's judgment and
- 32:20uh upheld the grant of consent for the
- 32:23project.
- 32:28Another interesting niche, naughty bit
- 32:30of EIA law that uh has been discussed
- 32:33this year is the barber concerned
- 32:38uh
- 32:40internal handling arrangements when the
- 32:42LPA when when the same legal entity is
- 32:46the local planning authority and the
- 32:48applicant. So this was a challenge to
- 32:50the grant of planning permission for the
- 32:52London wall west development i part of
- 32:53the barban quarter. the city of London
- 32:56itself was both the applicant and the
- 32:57local planning authority.
- 33:00Um avid EIA watchers and I'm sure you
- 33:03all are will remember regulation 64
- 33:06which requires that there be no conflict
- 33:08of interest um and that where
- 33:12uh a single entity is applicant and
- 33:14determining authority, there needs to be
- 33:17functional separation. and a lot of um
- 33:20meat was put on that bone by the
- 33:23Holocaust memorial case of a few years
- 33:25ago. So in this case, what happened?
- 33:27Well, the city of London published a
- 33:29handling note um including and that set
- 33:32out ways and methods by which
- 33:34confidential LPA documents would not be
- 33:37stored on computer folders that were
- 33:39accessible to the developer. These were
- 33:40meant to be passcode protected such that
- 33:42the developer couldn't get into them at
- 33:44all. As it happens, uh, various
- 33:48documents, various LPA documents were in
- 33:50fact not put in those locked
- 33:52confidential subfolders.
- 33:54So those on the developers team could
- 33:57have in theory accessed them. But the
- 34:00high court found as a fact and the facts
- 34:02of that case that a none had been
- 34:04accessed by the the developer team and b
- 34:08even if they had been no action or
- 34:10outcome would have been different. So
- 34:13the claim was dismissed.
- 34:15Um it is worth rereading because there
- 34:18are a number of bases on which the high
- 34:20court does end up finding for the
- 34:22claimant not in terms of outcome but
- 34:24just in terms of some of the arguments
- 34:26that was put. So for example, one
- 34:28argument that was put by uh on behalf of
- 34:30the city of London was that this is
- 34:32about REG 64 is about designing
- 34:37um suitable handling arrangements. Um
- 34:39and you know once you've designed them
- 34:41and put them in place that's fine. And
- 34:42the court said no it's an ongoing duty.
- 34:44It's not just about designing the
- 34:46appropriate arrangements but somewhat
- 34:47unsurprisingly you also have to carry
- 34:49them out and comply with them. Um for
- 34:52various reasons an argument was made
- 34:53that there was no breach. And again, the
- 34:55high court said, "No, no, no. There
- 34:56clearly was a breach. There were
- 34:57handling arrangements. There wasn't
- 34:58functional separation." Um, so there was
- 35:00a breach, but the high court um refused
- 35:05to grant relief or remedy, i.e. didn't
- 35:08quash the commission, didn't quash the
- 35:10permission uh for three broad reasons.
- 35:13One, the outcome would inevitably have
- 35:15been the same, so there was no prejudice
- 35:17to the claimants. two, the claimant had
- 35:20been in light of that kind of simplex
- 35:22section 312A argument running an
- 35:24argument that there was a a fundamental
- 35:26and intrinsic defeat of a due process
- 35:29value. And again, the high court gave
- 35:30that relatively short shrift and what
- 35:34comes out in the third limb is that a
- 35:35breach of rig 64 doesn't automatically
- 35:39visiate the grant of planning
- 35:41permission. Um
- 35:44the question is especially where as here
- 35:46the breach demonstrabably had no bearing
- 35:48on the decision that was eventually
- 35:50reached. So um the Barbacan quarter case
- 35:54in line with the um Holocaust memorial
- 35:57case really helpful summary of both what
- 36:01needs to be done under reggg 64 to
- 36:03maintain functional separation and then
- 36:05the implications and how you assess the
- 36:07implications and deal with matters where
- 36:09there has in fact been a breach of uh
- 36:13that functional separation requirement.
- 36:18Um, next case and final interesting kind
- 36:21of naughty niche EIA point that's come
- 36:23up this year is reasons for EIA
- 36:27screening decisions and opinions. So,
- 36:29this is a Lchester case. It was a
- 36:30challenge to a screening opinion
- 36:32indicating that reforesting uh about 290
- 36:36hectares
- 36:37of not sure what the land was might have
- 36:39been agricultural but basically creating
- 36:40a new 190 hectare woodland did not and
- 36:43would not require EIA.
- 36:46So the screening opinion that was issued
- 36:49many of us will be familiar with the
- 36:50kind of screening documents that you see
- 36:52it included a matrix for the various
- 36:54aspects um you know uh heritage for
- 36:57example then a box that had effect on
- 37:00impact and then a box for mitigation and
- 37:02I've put one of those examples on the
- 37:04screen so you see um it talks about the
- 37:07fact there was an independent landscape
- 37:10uh sorry historic environment study um
- 37:13that in that had the benefit of input
- 37:15from the landscape adviser
- 37:17It then recites some points about the
- 37:19scheme and reaches a conclusion that
- 37:20it's UKFS compliant and the documents
- 37:23that were relied on to reach those
- 37:24conclusions. Um and the claimment the
- 37:28ground in this case was those were
- 37:29insufficient insufficiently reasoned. It
- 37:32was a reasons challenge. Um many of us
- 37:34will be familiar with the standard of
- 37:35reasons in normal decision-making South
- 37:38Bucks DC importer but of course that
- 37:40doesn't apply in AIA screening
- 37:43decisions. It's a very different, much
- 37:45lighter touch approach. Um, Lanchester
- 37:48contains again a really helpful review
- 37:49of the case law. So, if you're in this
- 37:51sort of situation, it can be your your
- 37:53one-stop shop. Um, but in terms of how
- 37:56it's analyzed and assessed, these the
- 37:58high court said in isolation, yes, the
- 38:00the decision and that checklist
- 38:02contained no reasons, but this is a
- 38:04screening opinion, so one can and must
- 38:06look wider. Here the matrix explicitly
- 38:11um referred to the various um LCA and
- 38:14heritage type impact assessments. So one
- 38:17can infer that it adopted the
- 38:18conclusions of those assessments both on
- 38:20the discrete issues and more widely.
- 38:23You'll you'll recall that uh there's a
- 38:25reference to being UKFS compliant. UKFS
- 38:28is the UK forestry standard. That in
- 38:29itself is another standard. Um and the
- 38:32court because of its content, the court
- 38:34said that indicates um the protection of
- 38:36woodland heritage features that that
- 38:38there was a conclusion sorry that the
- 38:40proposal would protect woodland heritage
- 38:42features and adequately address the
- 38:44landscapes and that the assessments that
- 38:46we're talking about that were
- 38:47incorporated by reference were all
- 38:49suitably detailed. So um helpful
- 38:52indication um of being yellow carded by
- 38:55James but that's good because I'm coming
- 38:56to the end of this talk. Um, so last bit
- 39:00then, environmental outcome reports.
- 39:01Where are we now? To be honest, not I
- 39:04don't know, not very far. Not much has
- 39:06changed since March 2026. The government
- 39:08set out its road map to reform in March
- 39:10earlier this year. Three phases of
- 39:12reform. Setting the outcomes, reforming
- 39:14the process, and then transitioning and
- 39:15testing. Not entirely clear when it's
- 39:18going to happen. The planning act 2008
- 39:20guidance on pre-application steps though
- 39:22says it's expected, these are expected
- 39:23to be in place in 2027. We'll see. I was
- 39:26specifically asked to consider likely
- 39:28legal grounds of challenge. That's
- 39:29obviously
- 39:31really hard out given how far out we are
- 39:33and without seeing the details of these
- 39:36um the kinds of things that we'll
- 39:38usually see whether they've got any
- 39:39merit or not is a different question but
- 39:40we'll usually see whether there's a
- 39:42breach of the trade and cooperation
- 39:44agreement and obviously for that you
- 39:45need to be thinking not just if there's
- 39:46a regression in environmental terms but
- 39:48the uh economic and market consequences
- 39:51of it because that's the second part of
- 39:53the the the test in the TCA. Of course,
- 39:55that in itself not directly necessarily
- 39:57applicable in the UK anyway, whether
- 39:59there was sufficient focus on the EPs,
- 40:03the environmental principles policy
- 40:04statement, um, or the kind of challenge
- 40:07we see all the time, a generalized
- 40:09breach that there was a breach of the
- 40:10Aahus convention. Again, I'm not sure
- 40:12that one would get very far, but let's
- 40:14wait and see. So, that is a very quick
- 40:17roundup of EOS, and I will hand over to
- 40:20Margarita.
- 40:25Thank you, Nick. Um, hello everyone.
- 40:27I'll now turn to recent decisions in the
- 40:30high court touching on climate change in
- 40:32the planning context. I'll start with a
- 40:35very quick refresher on Finch, which I'm
- 40:37sure you all know of, and then I'll look
- 40:38at how that case has shaped decisions
- 40:41following it. Uh, in particular, the
- 40:43Gatwick challenge, uh, decided in June
- 40:45this year. I'll close by stepping back
- 40:47and reflecting on the climate challenges
- 40:49we've seen to national policy on climate
- 40:52change um starting with the net zero
- 40:54challenges and offer you some brief
- 40:56thoughts on where we might see things go
- 40:58next. So turning first to Finch I can
- 41:02get the slides to work.
- 41:05Yes. Oops. Um now that case concerned
- 41:10the approval of a project to extract oil
- 41:13uh from a wellside in Suriri. The issue
- 41:16before the court was whether the
- 41:18greenhouse gas emissions which will
- 41:19occur occur when the oil extracted from
- 41:22a well after being refined is burnt as
- 41:25fuel. Uh whether those emissions must be
- 41:28included in the EIA required before the
- 41:31development consent may be given for
- 41:32extraction of oil. The Supreme Court uh
- 41:35found that the obligation deriving from
- 41:37the 2017 environmental impact assessment
- 41:40regs did require assessing downstream
- 41:42combustion emissions of fossil fuel
- 41:45projects. Uh and in particular the court
- 41:47noted that direct and indirect effects
- 41:49must be assessed. Uh and that means that
- 41:52the regulations have a wide causal reach
- 41:54and that there's no principle that that
- 41:56if environmental harm is exported then
- 41:59it might be may be ignored. Um it
- 42:02concluded that uh combustion emissions
- 42:05are uh environmental effects and so do
- 42:08require assessment. Um its decision
- 42:11turned on the definition of the word
- 42:13effect in the phrase significant effects
- 42:15on the environment. The Supreme Court
- 42:17disagreed with the Court of Appeals
- 42:19ruling that whether something is an
- 42:21effect of the project is a matter of
- 42:23degree which requires the
- 42:24decision-making authority to evaluate
- 42:27whether there is a sufficient causal
- 42:29connection between the project and the
- 42:31putitive effect. Um it considered that
- 42:34that concept was intrinsically vague and
- 42:37unhelpful.
- 42:38uh and instead it found that what are or
- 42:42are not effects of a project is to state
- 42:44the obvious a question of causation. Uh
- 42:48and and it noted that that an effect is
- 42:50the obvious of a cause. Um it considered
- 42:54that it was not necessary to consider
- 42:56what is meant by likely uh because on
- 42:59the facts of that case it was an agreed
- 43:01fact that if the project does did go
- 43:03ahead the chain of events and the
- 43:06resulting effects on climate were not
- 43:08merely likely but inevitable.
- 43:11Um, and it noted at paragraph 80 that
- 43:14where X is both the necessary and both
- 43:17necessary and sufficient to bring about
- 43:19Y, that is the strongest possible form
- 43:22of causal connection, much stronger than
- 43:25is required as a test of causation for
- 43:28most legal purposes. and that uh and the
- 43:31court considered that that form of
- 43:33causation was made out on the facts
- 43:35because the extraction of oil was
- 43:37considered to be both necessary and
- 43:39sufficient to bring about comi com
- 43:41combustion emissions downstream.
- 43:44Importantly,
- 43:46the court disagreed with the submission
- 43:48that had been made on behalf of the
- 43:49developer that downstream emissions
- 43:51caused by the combustion of oil cannot
- 43:54in law be regarded as effects of the
- 43:56activity of extracting. Uh because of
- 43:58the need for the intermediate process of
- 44:00refinement uh to take place before the
- 44:03oil the oil can be used. uh the Supreme
- 44:06Court held that given the process of
- 44:08refining oil is one which is always
- 44:11expected and intended that the oil will
- 44:14undergo and which it is it was agreed
- 44:16there that the oil produced would
- 44:18inevitably undergo. Uh it would be
- 44:20unreasonable to regarded as breaking the
- 44:22the causal connection between the the
- 44:24extraction of oil and its use. Um, it
- 44:28also rejected the argument that the
- 44:30indeterminacy of future use of oil meant
- 44:33that downstream emissions could not be
- 44:35mean meaningfully assessed. And in so
- 44:37doing, it drew it drew a distinction
- 44:39between oil and commodities like iron or
- 44:42steel, which the court considered have
- 44:44many possible uses and could be
- 44:46incorporated into many different types
- 44:48of end products used for all sorts of
- 44:51different purposes. The court considered
- 44:53that that was not the case uh for oil.
- 44:56um and that that ruling is at paragraph
- 44:59121 of its judgment. So in summary, the
- 45:02Supreme Court clarified that downstream
- 45:05GHG emissions of a particular
- 45:07development require assessment under the
- 45:102017 regulations so long as those are
- 45:13capable of meaningful assessment. And
- 45:15this concept of capable of meaning
- 45:17meaningful assessment is one that does
- 45:19come up quite a bit in in subsequent
- 45:21case law. So I'll emphasize it now as a
- 45:24starting point. I now turn to look at uh
- 45:28Finch's impact on case law that followed
- 45:30it and I start with with Gatwick. Now
- 45:34what was being challenged there was the
- 45:36secretary for of state for transport's
- 45:39decision to make the Gatwick airport
- 45:40northern runway project development
- 45:42consent order 2025. That order
- 45:46authorized uh dual runway operations at
- 45:49Gatwick Gatwick airport through through
- 45:52altering the existing northern runway
- 45:55lifting restrictions that had been in
- 45:57place since 1979 on the northern uh
- 46:00runways use. The Gatwick challenge
- 46:03proceeded on numerous grounds um and
- 46:05I'll only focus on some of those. The
- 46:08first ground I want to look at is uh
- 46:10ground one brought brought by
- 46:12communities against gatwick no noise
- 46:15emissions. In it in its decision on this
- 46:17ground the sorry on this ground the
- 46:20claimant had argued in summary that the
- 46:22secretary of state's decision that the
- 46:24emissions brought about by the
- 46:26development were significant but
- 46:28nonetheless acceptable was contradictory
- 46:30and irrational. The court disagreed with
- 46:33the claimment and held that there is a
- 46:36distinction between two stages to the
- 46:38secretary of state's decision. The first
- 46:41stage is the determination of
- 46:43significance of of the emissions
- 46:45themselves. And within this first stage
- 46:47is a distinction between whether the
- 46:50proposed development will have
- 46:51significant effects on the environment
- 46:53by virtue of GHG emissions and whether
- 46:56the increase in GHG emissions resulting
- 46:59from the proposed development will be so
- 47:01significant as to have a material impact
- 47:04on the government's ability to meet its
- 47:06carbon reduction targets including uh
- 47:09the carbon budgets. Uh and that that's
- 47:11at paragraph 195 of the judgment. Now
- 47:14the second stage of the decisionmaking
- 47:17concerns the acceptability of a
- 47:19development proposal in light of the
- 47:21significance of those emissions. So the
- 47:23secretary of state forms two views.
- 47:25First on the significance of emissions
- 47:28in light of the government's net zero uh
- 47:30target and trajectory and second on the
- 47:34acceptability of a development proposal
- 47:36in light of the significance of those
- 47:38emissions. The court considered that
- 47:40this distinction was supported
- 47:43by the Yema guidance, the guidance
- 47:45provided by the Institute of
- 47:47Environmental Management and Assessment,
- 47:49uh to which the court gave significant
- 47:52weight. Um so at paragraph 210 it held
- 47:55that it was neither illogical nor
- 47:57contradictory for the SST to conclude
- 48:00that the proposed development does not
- 48:02merit refusal of development consent on
- 48:04the basis that it would have a material
- 48:07impact on the ability of government to
- 48:08meet its carbon reduction targets. her
- 48:11judgment that the proposed development
- 48:13is compatible with the Jet Zero strategy
- 48:16and can be managed within the
- 48:18government's overall strategy for
- 48:20meeting net zero and relevant carbon
- 48:22budgets does not contradict her finding
- 48:26that by virtue of the scale of its
- 48:27effects the project will fall short of
- 48:30fully contributing to the UK's
- 48:31trajectory towards net zero.
- 48:36So there was a clear distinction between
- 48:38the significant environmental effects of
- 48:40the proposed development and in light of
- 48:42those effects the acceptability of the
- 48:45proposed development on the application
- 48:47of policy. In summary, therefore the
- 48:50secretary of state could lawfully rely
- 48:51on the existence of the jet zero
- 48:53strategy and of the government's overall
- 48:56strategy for meeting net zero to
- 48:58conclude that despite the significance
- 49:00of the development's emissions, the de
- 49:02the development was nonetheless
- 49:04acceptable.
- 49:07Now I see the fourth ground uh brought
- 49:11by uh the community against gatwork
- 49:14noise emissions as to some extent
- 49:16related to their first ground. In their
- 49:19fourth ground of challenge they argued
- 49:21that the risks to delivery of the jet
- 49:23zero strategy were relevant to the
- 49:26secretary of state's decision on the
- 49:28acceptability of the proposal and that
- 49:30the failure to take them into account
- 49:32was legally flawed. particularly in
- 49:35light of the significant uh uh
- 49:37uncertainties of the effectiveness of
- 49:39that strategy. The court disagreed with
- 49:42that argument applying the ruling in the
- 49:44Boswell A12 case. It agreed on the basis
- 49:48of Boswool that the climate change act
- 49:50regime should not be duplicated in the
- 49:52context of development consent. So, as I
- 49:56will come to in a moment, risks to the
- 49:58delivery of national climate policy are
- 50:01addressed as the preceding process under
- 50:03the climate change act and should not be
- 50:06relied upon again at the development
- 50:08consent stage.
- 50:12Gatwick also provides an example of how
- 50:14the ruling on in Finch that effects that
- 50:16are capable of meaningful assessment
- 50:18must be assessed is applied in practice
- 50:21uh in a different sector. So here we're
- 50:23looking at aviation as opposed to oil
- 50:25and gas. Um now Kenya had argued by way
- 50:28of its second round that the secretary
- 50:30of state unlawfully failed to assess the
- 50:33emissions from inbound international
- 50:35flights including against the
- 50:37government's carbon budgets. It relied
- 50:40on Finch to argue that those downstream
- 50:42emissions had to be assessed. Now, while
- 50:44the Secretary of State accepted in
- 50:46principle that following Finch,
- 50:48downstream emissions had to be accounted
- 50:51for, it agreed with the developer that
- 50:53it was not possible to carry out a
- 50:55meaningful assessment of those
- 50:56emissions, nor that it was appropriate
- 50:59to compare those emissions to the
- 51:01government's domestic carbon budgets
- 51:04given uh the treatment of uh of aviation
- 51:07emissions in in international carbon
- 51:10accounting. Um the court disagreed with
- 51:13the claimment and held that
- 51:15circumstances may arise in which the
- 51:18decision maker undertaking an EIA
- 51:20identifies a project as giving rise to
- 51:22likely effect or effects which acting
- 51:25reasonably. They nevertheless judge
- 51:28either to be either not to be capable of
- 51:31meaningful assessment or to be capable
- 51:33of meaningful assessment only to a
- 51:35limited or qualified extent. provided
- 51:38that in making that judgment the
- 51:40decision maker has given proper
- 51:42consideration to the possibility of
- 51:44assessment that does not amount to a
- 51:46failure to fulfill the requirements of
- 51:48the EIA regulations. So in essence a
- 51:52decision maker can reach a conclusion
- 51:55that a particular effect cannot be uh
- 51:58meaningfully assessed so long as proper
- 52:00judgment is exercised in reaching that
- 52:02decision.
- 52:06Finally, I wanted to briefly touch on
- 52:09two further aspects of the challenge in
- 52:11Gatwick. Uh the claimants had argued
- 52:13that there was a failure to properly
- 52:14assess non CO2 emissions due to the
- 52:17failure to assess them quantitatively
- 52:19and also that there was a failure to
- 52:21assess the cumulative emissions
- 52:23consequent on Heathrow expansion. Now,
- 52:25both grounds were dismissed. On the
- 52:28issue of non CO2 effects, the court held
- 52:30that the assessment of non-CO2 effects
- 52:32was also a matter of evaluative
- 52:34judgment. The Secretary of State was
- 52:36entitled not to assess these
- 52:38quantitatively even if the claimment
- 52:40said that a methodology to do so had
- 52:43become available. Um on cumulative
- 52:46emissions, uh the Cordon Gatwick relied
- 52:49on the Boswell challenge relating to
- 52:51three road schemes along the A47.
- 52:54Um the court in Gatwick endorsed the
- 52:57ratio in Boswell namely that the
- 52:59assessment of cumulative emissions is
- 53:01also largely a matter of the decision
- 53:04makaker's evaluative judgment.
- 53:08Just briefly in in Boswell um the the
- 53:12decision maker maker there had assessed
- 53:15the emissions of each of the three road
- 53:17schemes against the carb carbon budgets
- 53:19individually individually but it hadn't
- 53:22assessed the emissions cumulatively
- 53:24against the carbon budget. The claimant
- 53:26argued that had the secretary of state
- 53:28done so uh it would have realized that
- 53:31the schemes together took took up about
- 53:330.5% of the national budget. and so the
- 53:37assessment of significance and
- 53:38acceptability would have differed. Um
- 53:41the court disagreed with that argument
- 53:43and it held that the secretary of state
- 53:45had been entitled to proceed as it had
- 53:48and it made two key points in reaching
- 53:50that finding. First uh it held that the
- 53:53assessment of cumulative emissions and
- 53:56their assessment against a particular
- 53:58judgment uh benchmark such as a carbon
- 54:00budget was a matter for the decision
- 54:03makaker's evaluative judgment. So
- 54:04there's no obligation uh to assess uh
- 54:08emissions against a particular
- 54:10benchmark. It's permissible but not
- 54:12required. Second, the secretary of
- 54:14state's approach had been lawful here
- 54:16because um there were good reasons not
- 54:19to assess the cumulative emissions
- 54:21against a national budget including
- 54:23because of the nature of GHG emissions
- 54:25as a global as opposed to local
- 54:28localized phenomenon.
- 54:31Very briefly, I'll move past this slide
- 54:33very fast. Uh the Jack Door decisions in
- 54:36Scotland, Scotland are a direct example
- 54:39of the impact of Finch. Um of course,
- 54:42now those decisions uh have been
- 54:44overturned by government, but query
- 54:47whether we might be might see uh any
- 54:50further challenges uh in a postfinch
- 54:54world. Um, very briefly, uh, Katherine,
- 54:58I wanted to point this out because this
- 55:00is an example of Finch applying outside
- 55:02the climate context and it's it's an
- 55:04example of a rare challenge that
- 55:06succeeded on the basis of of of Finch.
- 55:10So, so what what what was at stake here
- 55:12was um a poultry unit, an intensive uh
- 55:16uh farming unit. Uh and the question
- 55:19here was whether um there had been
- 55:22appropriate assessment of the
- 55:23environmental effects of uh uh raw manu
- 55:27manure and digested which would be uh
- 55:30produced as a result of the operation of
- 55:32the uh of the poultry unit. Um the the
- 55:36challenge succeeded in part and the key
- 55:38point that I wanted to point out here um
- 55:41is that while what the court uh held in
- 55:44caffin is that while the decision maker
- 55:46has a discretion so can exercise
- 55:49evaluative judgment as as to the
- 55:52significance of of environmental effects
- 55:54um following Finch um it had to exercise
- 55:58that judgment uh on the facts here the
- 56:01court found that the decision maker had
- 56:03failed to do so at all uh with respect
- 56:06to raw digest digested because they
- 56:10hadn't assessed spreading on third party
- 56:12land and so I think this case is a is an
- 56:15illustration of the very narrow
- 56:16circumstances where challenges are
- 56:19likely to succeed uh so not uh where uh
- 56:23there's there's arguments around whether
- 56:25that the exercise of that evaluative
- 56:26judgment uh was good enough uh which
- 56:29courts appear unlikely to be uh willing
- 56:32to interfere with But whether that
- 56:35judgment was exercised at all, where a
- 56:37judgment was not exercised at all, um a
- 56:40challenge is more likely to succeed.
- 56:44So, taking a step back and looking at
- 56:46cases, and I'm being yellow carded, so
- 56:48I'll wrap up quickly. Um I just wanted
- 56:51to to remind everyone of um uh claims
- 56:55challenging government policy,
- 56:57government climate policy directly. Um
- 57:00now those were the friends of the earth
- 57:02challenges to the net zero strategy and
- 57:04the carbon budget delivery plans. Um so
- 57:07essentially what what the courts decide
- 57:09there is that uh section 14 reports
- 57:12under the climate change act must enable
- 57:15the parliament and the public to assess
- 57:17polic policies. Uh and so uh there there
- 57:21needs to be a reasonable degree of
- 57:23specificity in in those uh section 13
- 57:26and 14 uh reports. uh and one important
- 57:29ruling is that an obviously material
- 57:31consideration in uh coming to coming up
- 57:34with policies and proposals under
- 57:36section 13 is risk to delivery of
- 57:39individual policies and proposals and to
- 57:41the achievement of the carbon budgets
- 57:43and the 2050 targets. Um so we see there
- 57:46that that there is a window of
- 57:48opportunity to challenge national policy
- 57:50on climate change uh where there's been
- 57:52a failure to assess risk to delivery.
- 57:55Importantly
- 57:56um as I mentioned earlier um that does
- 58:00not mean that risk to delivery comes
- 58:02into challenges to development consent.
- 58:06The true regimes are different and
- 58:08that's the bos 12 case and gatwick. Um
- 58:11and on this slide here uh are a number
- 58:13of more recent decisions following uh
- 58:17the netzero strategy challenges which
- 58:19show the limits uh of of of that of that
- 58:23case. So possible and global feedback
- 58:25are a good example of where challenges
- 58:28uh have failed. Um so to to conclude
- 58:32looking forward where are we now? Um it
- 58:34seems that um consent challenges on
- 58:37carbon grounds are very difficult. Uh
- 58:41quite a lot is a matter for the decision
- 58:44maker and for the decision maker's
- 58:46evaluative judgment. So it seems
- 58:48difficult to succeed in challenging
- 58:50decisions to approve developments uh
- 58:53where the decision maker has uh properly
- 58:56turned his or her mind to the issue of
- 58:59how uh GHG emissions uh whether and how
- 59:02GHG emissions might result in in in
- 59:04environmental effects. Uh one one uh
- 59:08point to raise at this stage is that we
- 59:11have seen movement in the regional human
- 59:13rights courts and international courts
- 59:16which uh continue to emphasize that
- 59:18states that the that the margin of
- 59:20discretion afforded to states in in
- 59:23climate ma matters is narrow and that
- 59:26states have to operate under stringent
- 59:29due diligence standard. So one question
- 59:32that I've been asking myself is will
- 59:34this produce more intensive review and
- 59:37less deference to decision making
- 59:40domestically? Um something to be seen
- 59:42perhaps in the next few years. Thank you
- 59:45very much and I'll pass over to Odette.
- 59:53Hi everyone. Thank you Margarita. So
- 59:55something then now to bring everyone
- 59:58slightly more back down to earth and to
- 1:00:00the day-to-days of of planning. Um also
- 1:00:03not necessarily immediately obvious how
- 1:00:06this relates to environmental impacts in
- 1:00:08the same way but in fact as many of you
- 1:00:10will know the majority of
- 1:00:14well in many cases environmental effects
- 1:00:16the way they are regulated in planning
- 1:00:18decisions is by virtue of section 106
- 1:00:21agreements. So these can have quite
- 1:00:23profound implications for the
- 1:00:26environment um in particular decisions.
- 1:00:29So I'm going to talk about some recent
- 1:00:30case law on section 106 agreements and
- 1:00:33the cases there up on the screen.
- 1:00:35There's been a flurry of activity over
- 1:00:37the last year particularly as you'll see
- 1:00:40there on the question of publication the
- 1:00:43procedural question of publication of
- 1:00:44section 106 agreements. Um but also some
- 1:00:48more substantive issues that I'll turn
- 1:00:49on to in due course. So the first issue
- 1:00:52I'm going to discuss is this duty to
- 1:00:55publish and the three cases that have
- 1:00:57been in the courts over the last year
- 1:01:00which is which is a lot on what was
- 1:01:02quite otherwise apparently a minor part
- 1:01:04of the the pre-procedural framework for
- 1:01:06planning. So just to start by outlining
- 1:01:09that the duty to publish is of course a
- 1:01:12statutory one and it's set out in
- 1:01:14article 43 of the DMPO
- 1:01:18and essentially that requires on local
- 1:01:21planning authorities to contain in their
- 1:01:23planning register in respect of any
- 1:01:26application not finally disposed of. So
- 1:01:28any application that hasn't been decided
- 1:01:31a copy of any planning obligation
- 1:01:33proposed to be entered to in connection
- 1:01:35with the application. So starting point,
- 1:01:37there is a statutory duty to publish
- 1:01:39section 106 obligations um for schemes
- 1:01:43that have not yet been decided. So in
- 1:01:45advance of the decision and that's if
- 1:01:47that's anything to take away, make sure
- 1:01:49that is that is the case in every scheme
- 1:01:52you're involved in whether from the the
- 1:01:54council side or the developer side.
- 1:01:57Um despite that statutory duty, as I
- 1:02:00said, it's been in the high high court
- 1:02:02and indeed court of appeal three times
- 1:02:03over the last year. Um the first case
- 1:02:07is a case of green fields. Um and this
- 1:02:11was about the essentially the
- 1:02:14environmental impact that was subject to
- 1:02:16dispute. Um was a highways contribution
- 1:02:20and the the quantum of the highways
- 1:02:22contribution.
- 1:02:24And as you can see there on the screen,
- 1:02:26council resolved to grant permission for
- 1:02:28473 houses subject to a section 106. The
- 1:02:32heads of terms were set out in the
- 1:02:34officer report. Um, but the permission
- 1:02:38was issued with no draft and no final
- 1:02:41agreement on the council's planning
- 1:02:44register on the website online. Um, and
- 1:02:47in fact it was only published after
- 1:02:49Greenfield's the claimant raised the
- 1:02:51breach of the statutory duty we've just
- 1:02:52looked at in pre-action correspondence.
- 1:02:55Um, and essentially in this case the
- 1:02:57court said there's no doubt there was a
- 1:02:58breach of the statutory provisions. It
- 1:03:00simply wasn't published. and um the
- 1:03:03heads of terms being in the officer
- 1:03:06report was was not sufficient in any way
- 1:03:09to discharge that duty um in particular
- 1:03:13in the context of the particular sum
- 1:03:16being a matter of contestation. And what
- 1:03:18the court was really looking at in this
- 1:03:20case is whether that failure to publish
- 1:03:22actually rendered the decision invalid
- 1:03:25um or whether something else should
- 1:03:27happen. So should it be quashed simply
- 1:03:29on the basis of that failure to publish?
- 1:03:31And what that required consideration of
- 1:03:33is case law such as the case called Seni
- 1:03:36from 2005 in the House of Lords. Um
- 1:03:39which is a public law case law more
- 1:03:41generally on which says you've got to
- 1:03:43look at what the intention of parliament
- 1:03:45was when it created that statute when
- 1:03:48you're deciding what the implication is
- 1:03:49of a failure to comply with the
- 1:03:51statutory provision. Um, and in this
- 1:03:54case, the court looked at the underlying
- 1:03:56purpose of the statutory provision and
- 1:03:58said it was to enable members of the
- 1:03:59public to know the terms of the proposed
- 1:04:01or agreed obligation and to enable them
- 1:04:04to comment. Um, so it's not a statutory
- 1:04:07obligation to consult, but to include
- 1:04:09information in the public register. And
- 1:04:12what the court said, it's not the case
- 1:04:14that any failure to comply with the
- 1:04:16statute would render the decision
- 1:04:18invalid. Um there's a wide range of
- 1:04:20scenarios where you could have a section
- 1:04:22106 agreement that wasn't published. So
- 1:04:24one might be it wasn't published
- 1:04:26properly on the council's register but
- 1:04:28it was in the public domain somewhere
- 1:04:29else and people had seen it and people
- 1:04:31had commented. That might be a different
- 1:04:32scenario. Um or it might be that the
- 1:04:34section 106 had sort of nothing of
- 1:04:36relevance in at all in terms of
- 1:04:38substantive merits. But in this case
- 1:04:41that wasn't the case. There was no
- 1:04:43public statement um no publication
- 1:04:45anywhere of the agreement.
- 1:04:48Um there was there was a a real chance
- 1:04:50that people may wanted to have commented
- 1:04:53on it on the substance of it in
- 1:04:55particular because as as it says there
- 1:04:57on the screen there was a £400,000
- 1:04:59contribution and but the officer report
- 1:05:02had estimated the costs of the works
- 1:05:04that were being mitigated to be more
- 1:05:06than £700,000. So there was an obvious
- 1:05:08reason people might wanted to have
- 1:05:10commented and the court concluded on
- 1:05:12that basis it couldn't be satisfied the
- 1:05:15outcome would be substantially different
- 1:05:16had the council properly published it.
- 1:05:19So that procedural failure did lead to
- 1:05:21invalidity and quashing of the decision
- 1:05:23in that case. So following on from
- 1:05:26Greenfields, we had two other cases. Um
- 1:05:29and Chidswell
- 1:05:32was um essentially a case that
- 1:05:36where um where this ground about
- 1:05:40publication of the section 106 agreement
- 1:05:42wasn't originally pleaded but after the
- 1:05:44court of appeals decision in green
- 1:05:46fields the court granted permission to
- 1:05:49change the grounds and to add a new
- 1:05:51ground relating to this procedural
- 1:05:53failing. relatively similar scenario.
- 1:05:56Outline permission for housing, in this
- 1:05:58case 180 homes. Um the committee
- 1:06:01resolved to grant subject to a section
- 1:06:03106 agreement. The claimment asked for
- 1:06:06drafts of that agreement and none were
- 1:06:09published at all. And
- 1:06:12the difference here being in in this
- 1:06:14case, the section 106 agreement wasn't
- 1:06:16about highways contributions. It was
- 1:06:17about adequacy of the biodiversity
- 1:06:19safeguards and particularly the way that
- 1:06:22the section 106 secured the 10% BNG that
- 1:06:26was proposed and that the officer report
- 1:06:29referred to
- 1:06:32and pretty similar position taken by the
- 1:06:34court um court said essentially the
- 1:06:38publication would have enabled objectors
- 1:06:40to comment intelligently about the
- 1:06:43adequacy of those biodiversity
- 1:06:44safeguards. Um it it went as far as to
- 1:06:47say that had the section 106 been
- 1:06:50published um people would have been
- 1:06:52likely to make objections and there's a
- 1:06:54strong likelihood it might even have
- 1:06:56gone back to committee. Um the court
- 1:06:58made clear the obligation to publish is
- 1:07:00not conditional on a request from
- 1:07:02objectors. But in this case in fact one
- 1:07:04was made um and on the factual
- 1:07:07circumstances
- 1:07:09it was a split decision at committee.
- 1:07:11three of seven committee members voted
- 1:07:12against
- 1:07:14and the court again simply couldn't say
- 1:07:16that the outcome would not have been
- 1:07:19substantially different if those me if
- 1:07:21other members for example had been able
- 1:07:23to reconsider the application with the
- 1:07:26benefit of the draft agreement. So again
- 1:07:29risk of prejudice and applying the the
- 1:07:32principles in synergy to whether the
- 1:07:34failure renders the decision invalid. In
- 1:07:37this case it did too and the commission
- 1:07:39was quashed on the basis of the
- 1:07:40non-publication.
- 1:07:42So the final case on this issue then um
- 1:07:46slightly different one but following
- 1:07:48again the the Chidswell and the
- 1:07:51Greenfields cases. So this was a
- 1:07:55planning permission for a solar farm
- 1:07:57development
- 1:07:59and the section 106 here in this case a
- 1:08:02unilateral obligation related to the
- 1:08:05issue of skylark mitigation and
- 1:08:08provision for for displaced skylarks
- 1:08:11essentially
- 1:08:13slightly different because in this case
- 1:08:16the there was a draft obligation
- 1:08:20published um but it was at 7 minutes
- 1:08:24before the committee meeting took place.
- 1:08:27Um, and at that meeting, committee
- 1:08:28resolved to publish, but there was no
- 1:08:30sort of substantive discussion of the
- 1:08:32section 106 that had been uploaded just
- 1:08:34before. Um, not clear that members had
- 1:08:37had a chance to to read and process it.
- 1:08:40So the the claim was brought on the
- 1:08:42basis that that was too short a period
- 1:08:48um the seven minutes
- 1:08:51but the undertaking following the
- 1:08:53meeting was then executed and published
- 1:08:56online on the council's register as it
- 1:08:58should have been um sometime after the
- 1:09:01committee and in advance of the formal
- 1:09:03decision issued by the council granting
- 1:09:06permission. So in this case, what the
- 1:09:09judge concluded was there was no breach
- 1:09:12of the statutory provision because the
- 1:09:15statuto provision is simply that you've
- 1:09:16got to publish on the register before
- 1:09:20it's finally disposed of. So before the
- 1:09:22actual decision is made, not the
- 1:09:24resolution to grant activity.
- 1:09:27Um the question was was there sort of a
- 1:09:30a breach in substance of the intention
- 1:09:33of the underlying statute by not
- 1:09:35allowing the committee to properly
- 1:09:36consider it even if no express breach on
- 1:09:39the face of the wording of the statute.
- 1:09:42Um the judge accepted that 7 minutes was
- 1:09:45too short a time to digest the document.
- 1:09:48Um,
- 1:09:50but in this case, nonetheless, the
- 1:09:52spirit of the article was still met
- 1:09:54because the seven minutes wasn't the
- 1:09:56relevant part of time. The relevant time
- 1:09:58was the 22-day window between the
- 1:10:01original publication and the final
- 1:10:03decision. Um, and in this case, the
- 1:10:06agreement wasn't particularly lengthy or
- 1:10:08complex. And after it had been
- 1:10:10published, there would have been
- 1:10:11opportunity for people to comment, for
- 1:10:13the committee to comment, for the
- 1:10:14committee to bring the application back
- 1:10:16to committee. reconsider it. So all that
- 1:10:19mattered is that that it was on the
- 1:10:21website in substantial time enough for
- 1:10:22people to digest, process, comment if
- 1:10:25they wanted before the ultimate decision
- 1:10:27was issued and not before the planning
- 1:10:28committee. Um but the court did
- 1:10:30emphasize that mere technical observance
- 1:10:33of the words of the theft often wouldn't
- 1:10:36be sufficient. Um the intention and
- 1:10:38spirit need to be complied with too. So
- 1:10:417 minutes before the final decision
- 1:10:43probably wouldn't have been enough. Um
- 1:10:46and the factors you've got to consider
- 1:10:48are the length of the agreement, the
- 1:10:50complexity,
- 1:10:51um you know, the accessibility of it on
- 1:10:54the website, the overall time allowed to
- 1:10:56consider it. It's a very fact-sensitive
- 1:10:58inquiry in a particular case as to
- 1:11:00whether the spirit of the requirement
- 1:11:02has been complied with.
- 1:11:05So I'm going to move on to a different
- 1:11:06issue now relating to section 106
- 1:11:08agreements. And this is something that
- 1:11:10has been
- 1:11:12um the subject of various various shift
- 1:11:15in government policy over the last year,
- 1:11:17particularly this time last year and
- 1:11:19over over the winter, a flurry of
- 1:11:22guidance from government about
- 1:11:24affordable housing viability and and how
- 1:11:27people should change section 106
- 1:11:29commitments to affordable housing in the
- 1:11:31context of affected viability
- 1:11:34considerations, particularly in London.
- 1:11:36um as viability has become such a such a
- 1:11:39major issue for housing developers and
- 1:11:42the tone of the government's guidance in
- 1:11:44many instances to start with at least
- 1:11:45was suggesting you shouldn't be using
- 1:11:48section 3 applications to bury
- 1:11:51affordable housing requirements and that
- 1:11:53should probably come by way of section
- 1:11:55106. Um but of course that guidance and
- 1:11:58the question for the courts is what the
- 1:12:01statute allows you to do. And this case
- 1:12:03was a was a case about whether section
- 1:12:0573 which allows you to vary the
- 1:12:08conditions on a permission was a
- 1:12:10legitimate way of changing the section
- 1:12:12106 um affordable housing requirements
- 1:12:16in this particular context. And so the
- 1:12:19section 73 was an application to vary a
- 1:12:22condition to remove affordable housing.
- 1:12:26Um and in this particular case there was
- 1:12:30a condition that required the housing
- 1:12:32type standard and floor plans to be in
- 1:12:34accordance with a particular affordable
- 1:12:37housing accommodation schedule. So if
- 1:12:41the section 73 was approved and the
- 1:12:44condition was changed, there would be a
- 1:12:47different condition in respect of
- 1:12:48affordable housing. Um the council
- 1:12:52refused permission for the section 73
- 1:12:55essentially because that would result in
- 1:12:57a conflicting position between the
- 1:12:59planning commission and the section 106
- 1:13:01agreement that had different provisions
- 1:13:04as to affordable housing requirements.
- 1:13:06But at the appeal, the council agreed
- 1:13:09without prejudice to a deed of variation
- 1:13:11to amend the underlying section 106. Um,
- 1:13:15and that deed of variation was clear it
- 1:13:17would only operate if the appeal were
- 1:13:19allowed. So the council entered into
- 1:13:22that without prejudice to its case
- 1:13:24permission should be refused.
- 1:13:26And at the appeal, the inspector
- 1:13:28identified the main issue as whether a
- 1:13:30section 73 application is an appropriate
- 1:13:33means to reduce the level of affordable
- 1:13:35housing previously secured. And
- 1:13:37essentially the answer was was yes. He
- 1:13:39found the there was a condition
- 1:13:41controlling affordable housing here um
- 1:13:43via the approved plans. And so there was
- 1:13:46no reason why the developer shouldn't
- 1:13:48use a section 73 application to result
- 1:13:51in a new permission with different
- 1:13:52plans.
- 1:13:54and the high court um upheld that
- 1:13:57approach. The inspector had a valid
- 1:13:59application and appeal before him which
- 1:14:02on the facts merited variation of the
- 1:14:05conditional requirement for affordable
- 1:14:06housing um because of the change
- 1:14:09viability position. And there was the
- 1:14:12the deed of variation ready to go
- 1:14:14without prejudice if the appeal were
- 1:14:16allowed to make sure the section 106 and
- 1:14:18the permission itself were all in line.
- 1:14:21Um however um Mr. Justice Kimlin in the
- 1:14:25high court was keen to emphasize that
- 1:14:27while not the case on these facts there
- 1:14:29might be cases where there is no
- 1:14:31relevant planning condition which
- 1:14:33controls affordable housing provision
- 1:14:35and the entire controls are within the
- 1:14:37section 106 only. So it doesn't say this
- 1:14:40case that section 73 is an appropriate
- 1:14:43route in every single case. It really
- 1:14:45depends on how the permission is
- 1:14:46structured and and and what the
- 1:14:48conditions say.
- 1:14:50The final case then I wanted to touch on
- 1:14:53another judgment of Mr. Justice Kim.
- 1:14:56So this was an appeal, a planning appeal
- 1:15:01allowed um in respect as part of an
- 1:15:04allocation in the development plan. Um
- 1:15:07and the inspector allowed the appeal and
- 1:15:09granted permission subject to a section
- 1:15:12106 agreement that did not include a
- 1:15:15requested infrastructure contribution
- 1:15:17that the council had made. So the
- 1:15:19council had been asking that the
- 1:15:21developer pay a certain amount of money
- 1:15:24towards the broader allocation and and
- 1:15:26infrastructure on it.
- 1:15:29The inspector refused the council's
- 1:15:32request for that particular sum of
- 1:15:33money. Um essentially the master plan
- 1:15:36had not yet come forward for the alle
- 1:15:39for that
- 1:15:41um
- 1:15:42for the allocation. The master plan
- 1:15:44hadn't yet come forward. So the
- 1:15:45inspector essentially said there wasn't
- 1:15:47adequate evidence to conclude that the
- 1:15:49amount of money the council was
- 1:15:51requesting um was fairly and reasonably
- 1:15:54related to the development um to this
- 1:15:57parcel of the allocation coming forward
- 1:15:59on its own without the wider master
- 1:16:00plan.
- 1:16:02The result was that the development made
- 1:16:04no contribution to the infrastructure
- 1:16:06costs of the whole allocation not
- 1:16:08withstanding the fact that there was a
- 1:16:10development plan policy saying bits of
- 1:16:13the allocation that come forward should
- 1:16:15make a contribution. Um but on the basis
- 1:16:18the inspector found that there was some
- 1:16:20specific some requested by the council
- 1:16:22wasn't justified. They granted
- 1:16:24permission without any sum at all. And
- 1:16:27of course
- 1:16:29the tests in regulation 122 of the SIL
- 1:16:32regs and the MPPPF are that any planning
- 1:16:34obligation any money paid that way has
- 1:16:37to be necessary directly related to the
- 1:16:39development and fairly and reasonably
- 1:16:41related in scale and kind to the
- 1:16:43development and there's pace law bishop
- 1:16:46um the case cited in this in this
- 1:16:48authority that says whether the
- 1:16:51contribution is necessary is not
- 1:16:53assessed by a but for test but it's a
- 1:16:56judgment assessed on a range of relevant
- 1:16:58policies and material considerations. So
- 1:17:01it is ultimately a matter of planning
- 1:17:03judgment for the inspector and the court
- 1:17:05held that it was fine for the inspector
- 1:17:07to conclude that the sum requested by
- 1:17:09the council was not justified on the
- 1:17:13specific facts here. However, um the
- 1:17:17inspector did commit a legal error by
- 1:17:19not then going on to consider whether
- 1:17:21some other level of contribution
- 1:17:24was reasonably necessary um by virtue of
- 1:17:27the development plan policy that
- 1:17:29requests a contribution for partial bits
- 1:17:32of the allocation coming forward. So
- 1:17:35there was a misinterpretation of the
- 1:17:37development plan policies by way of the
- 1:17:39inspector's failure to consider while
- 1:17:42the council sum isn't right should some
- 1:17:43other sum some be required to mitigate
- 1:17:46the environmental effects of this
- 1:17:48proposal. The result being permissions
- 1:17:50granted with no mitigation whatsoever
- 1:17:53with no proportionate contribution tool.
- 1:17:56So again the the permission was quashed
- 1:17:58on that on that basis.
- 1:18:01So finally before I turn over to Poppy
- 1:18:04just some final comments from me also on
- 1:18:08changes on the horizon. Um and just this
- 1:18:10is a quite a narrow issue but many of
- 1:18:13you will have seen in the last week or
- 1:18:15two uproar on on LinkedIn and more
- 1:18:18broadly about changes to the pins
- 1:18:20procedural guidance in relation to
- 1:18:23section 106 agreements. Um, and this is
- 1:18:26all under the umbrella of the new PINS
- 1:18:28procedural guidance for appeals for
- 1:18:30applications submitted from the start of
- 1:18:33April of this year. Um, and in
- 1:18:36particular, as you as you'll all be
- 1:18:38aware, the new approach being that the
- 1:18:40majority of appeals are to go down a
- 1:18:42part one written representations route
- 1:18:45where no new information is allowed to
- 1:18:47be submitted with the appeal. You just
- 1:18:49have your application and the inspector
- 1:18:51determines it on that basis.
- 1:18:54Essentially, there's been an update to
- 1:18:56that guidance a couple of weeks ago that
- 1:18:58says, and it's not said anywhere else in
- 1:19:01government guidance, that planning
- 1:19:02applications should be submitted with
- 1:19:05PL, sorry, section 106 agreements should
- 1:19:07be submitted with planning applications
- 1:19:09and only submitted for the first time
- 1:19:11with an appeal in exceptional
- 1:19:13circumstances.
- 1:19:14Um, and if in those exceptional
- 1:19:16circumstances, the the obligation
- 1:19:18submitted with the appeal. Um, if you've
- 1:19:20got written reps, it has to be executed
- 1:19:23and certified and submitted with your
- 1:19:25appeal. Um, and if it's a hearing or
- 1:19:27inquiry, a final draft 10 days before
- 1:19:30the event. And that's obviously very
- 1:19:32difficult because councils are generally
- 1:19:35unwilling to engage in finalizing and
- 1:19:38signing section 106 agreements at
- 1:19:40application stage if they're going to
- 1:19:42refuse the application anyway. Um, so
- 1:19:46this is potentially going to cause
- 1:19:48difficulty in practice. There's been
- 1:19:50calls on the inspectorate to have a look
- 1:19:53again at what they've set out there in
- 1:19:55that guidance. But for now, it is just
- 1:19:57to be aware of this this new approach
- 1:19:59that potentially the planning inspector
- 1:20:00is going to take and the need to
- 1:20:02frontload as far as possible section 106
- 1:20:05matters as early in the application
- 1:20:06process and the appeal process as you
- 1:20:09can. So, thanks very much. I'm going to
- 1:20:12hand over now to Poppy for our final
- 1:20:14topic.
- 1:20:15>> Um so hi I am Poppy. Um I am going to be
- 1:20:19talking talking about the scope for
- 1:20:20reliance on environmental principles in
- 1:20:22planning high court cases. Um there is
- 1:20:26well two things. The first thing is that
- 1:20:29and I will do this um I'm losing my
- 1:20:31voice. So if I sound a bit like a frog
- 1:20:34uh you now know why. And the second
- 1:20:36thing is that um we don't have lots of
- 1:20:38time obviously. So I have decided to do
- 1:20:41this talk through the lens of the Finch
- 1:20:43case and the Supreme Court and other
- 1:20:44high court planning cases which have
- 1:20:46applied it since. There's a bit of
- 1:20:47overlap with Margarita but um I will be
- 1:20:50looking at some cases she hasn't
- 1:20:52considered and also angles in those
- 1:20:54cases um which her talk didn't consider.
- 1:20:56So do stay around. Um so we have a tree
- 1:20:59here because Finch I consider Finch to
- 1:21:02be the root of all the cases that come
- 1:21:04next. Um and then the cases that come
- 1:21:07next will be the branches and the
- 1:21:09blossom. DC.
- 1:21:11So Margarita provided a very helpful
- 1:21:15overview of Finch. So I won't go through
- 1:21:17this in much detail. Um but I think just
- 1:21:21by way of stepping back before in any
- 1:21:23case before planning permission could be
- 1:21:25granted for a development project which
- 1:21:26is likely to have significant effects on
- 1:21:29the environment. Um, legislation in the
- 1:21:31UK requires an EIA to be carried out and
- 1:21:35the relevant legislation was the 2017
- 1:21:37EIA regs which requires an EIA to
- 1:21:40identify and describe and assess the
- 1:21:42likely effects sorry the likely direct
- 1:21:45and indirect effects of the project on
- 1:21:47the environment that includes the um the
- 1:21:50impacts on the climate.
- 1:21:53So as Margaret explained in this case
- 1:21:56there was a developer who applied to
- 1:21:57Sari County Council for permission to
- 1:21:59expand oil production from a well site
- 1:22:01in in Horse Hill which is near Holy and
- 1:22:04the proposed project would involve the
- 1:22:06extraction of oil from six wells over a
- 1:22:08period of around 20 25 years. Um
- 1:22:12the developer argued that when you're
- 1:22:14looking at the scope of um greenhouse
- 1:22:18gas emissions, the EIA should be
- 1:22:19confined to the direct releases of
- 1:22:21greenhouse gases from within the
- 1:22:23wellsight boundary um during the
- 1:22:25lifetime of the project. And so that the
- 1:22:27EIA need not include an assessment of
- 1:22:29greenhouse gas emissions that would
- 1:22:31occur when the oil was extracted from
- 1:22:34wells but ultimately burnt elsewhere as
- 1:22:37fuel. um and that was what was accepted
- 1:22:39by the council. Then this was appealed
- 1:22:41by a local resident who applied for JR
- 1:22:43of the decision and she argued that the
- 1:22:45decision was unlawful because the EIA
- 1:22:47was required to um but did not in this
- 1:22:50case include an assessment of the
- 1:22:51combustion emissions. So that's roughly
- 1:22:54what that one is about. So in terms of
- 1:22:57what was held by a 3-2 majority it was
- 1:23:00held that the council's decision was
- 1:23:02unlawful because the emissions that
- 1:23:03would occur when the oil is produced is
- 1:23:06and is burnt as fuel are within the
- 1:23:08scope of the EIA as required by law and
- 1:23:11in carrying out an an EIA of a project
- 1:23:15for the extraction of oil the authority
- 1:23:18has to assess as an indirect effect of
- 1:23:20the project the environmental effects of
- 1:23:22greenhouse gas emissions arising from
- 1:23:24the ultimate combustion of the oil once
- 1:23:26refined and used as fuel.
- 1:23:29Um it was an agreed fact that in this
- 1:23:31case if the project went ahead, it was
- 1:23:33not merely likely but inevitable that
- 1:23:35the oil produced from the wellside would
- 1:23:37be refined and as an end product would
- 1:23:40undergo combustion which would then
- 1:23:42produce the greenhouse gas emissions. Um
- 1:23:44and it's not and it was never disputed
- 1:23:45that those emissions would have a
- 1:23:47significant impact on the climate. So
- 1:23:49the question was essentially whether
- 1:23:51those um greenhouse gas emissions which
- 1:23:53are sort of further down the line from
- 1:23:55the um the extraction of oil would be an
- 1:23:58indirect or direct effect. Um
- 1:24:02and
- 1:24:04I think there are two particularly
- 1:24:06interesting points about this judgment
- 1:24:09um which I'll touch on now and also see
- 1:24:11how they impact the other case law. The
- 1:24:13first one is this point about
- 1:24:14intermediate steps. So it didn't matter
- 1:24:18that what fuel is burned what sorry the
- 1:24:21fuel that is burnt further down the line
- 1:24:23it will not be the crude oil produced at
- 1:24:25the well site um but it will be an end
- 1:24:27product which would be made at a
- 1:24:28separate facility where the oil is
- 1:24:30refined. So you have a sort of chain of
- 1:24:32causation between the initial drilling
- 1:24:35or extraction um all the way down to the
- 1:24:38ultimate burning. there are lots of
- 1:24:40stages in the process and the court said
- 1:24:41well that doesn't matter um because um
- 1:24:44here it was it was an inevitability that
- 1:24:47it would be burnt and there was there
- 1:24:49was there was a clear causal connection
- 1:24:51and there was a certainty of causal
- 1:24:52connection between the extraction and
- 1:24:54the combustion
- 1:24:56and the second point um about this case
- 1:24:59that is interesting is that um is this
- 1:25:02anywhere in the world point which is the
- 1:25:04court said the EIA directive does not
- 1:25:06impose any geographical limit on the
- 1:25:09scope of the environmental effects
- 1:25:11effects of a project which must be
- 1:25:12assessed. Um so the council took the
- 1:25:15approach that when you're looking at
- 1:25:17doing an EIA you have to look at the
- 1:25:18emissions expected to occur at the
- 1:25:20project site but that was wrong. Um this
- 1:25:23the Supreme Court said that the very
- 1:25:25nature of indirect effects is that they
- 1:25:27may occur anywhere um from their source.
- 1:25:29So here it didn't matter that the fuel
- 1:25:31might be burnt in a completely different
- 1:25:33country. Um that was irrelevant and it's
- 1:25:35sort of unsurprising actually that it
- 1:25:38was quite it was a landmark decision and
- 1:25:40interestingly I saw when I was preparing
- 1:25:42for this that the Guardian referred to
- 1:25:43it as one of the most groundbreaking
- 1:25:44environmental decisions of the century.
- 1:25:46So um clearly very important.
- 1:25:50The other point is that there is a
- 1:25:51descent which I won't go into but um it
- 1:25:53was a 3-2 majority. So you had Lord
- 1:25:56Sales and Lord Richards well Lord Sales
- 1:25:58with whom Lord Richards agrees um
- 1:26:01dissenting.
- 1:26:03So moving then to the Friends of the
- 1:26:06Earth case which as Margarita said was
- 1:26:08the first case to apply Finch. It
- 1:26:11concerned a planning application for the
- 1:26:12mining and processing of metallurgical I
- 1:26:15always struggle to say that one uh coal
- 1:26:18which would eventually be used for the
- 1:26:20production of steel. Now there are two
- 1:26:22arguments. So there's um sorry as an
- 1:26:25inquiry uh an inspector determined that
- 1:26:27the greenhouse gas emissions from
- 1:26:28burning um of this coal were not likely
- 1:26:31significant indirect effects of the
- 1:26:33proposed development and within the
- 1:26:34scope of the EIA. There were two
- 1:26:36arguments two main arguments advanced.
- 1:26:39The first one was the one that Margarita
- 1:26:40touched on to do with the breach of um
- 1:26:42EIA regulations,
- 1:26:44which was that um the secretary of state
- 1:26:47acted in breach of those regulations by
- 1:26:49deciding that the greenhouse gas
- 1:26:50emissions from the burning of the White
- 1:26:51Haven coal were not is not a significant
- 1:26:53likely effect of the development. And
- 1:26:55then the second argument is quite an
- 1:26:58interesting one. So the mining company
- 1:27:01had argued that um the emissions from
- 1:27:04the burning of the coal would not give
- 1:27:06rise to any material additional
- 1:27:08emissions because the white haven coal
- 1:27:10would replace coal otherwise being
- 1:27:13supplied from US coal mines to the US
- 1:27:15and also the European steel making
- 1:27:17market. So in essence what the mining
- 1:27:20company argued was that um if this coal
- 1:27:24is being extracted here White Haven then
- 1:27:27a broadly equivalent amount of coal will
- 1:27:29remain in the ground um in the US mines.
- 1:27:32So it's this this substitution one for
- 1:27:34the other. And on this point um the
- 1:27:37claimments argued that the secretary of
- 1:27:39state's conclusion that the proposal
- 1:27:40would have a neutral or beneficial
- 1:27:42effect on um emissions um it was
- 1:27:46inconsistent with findings in a decision
- 1:27:49letter on substitution um and said
- 1:27:52essentially it was illogical in the
- 1:27:54absence of any finding um and with the
- 1:27:56degree any finding as to the degree of
- 1:27:59substitution. Effectually there was no
- 1:28:00evidence that this was the case.
- 1:28:03So then what was decided?
- 1:28:07So oh sorry this slide is not correct.
- 1:28:10I'm sorry I sent an updated ones but
- 1:28:12both arguments succeeded on yeah it was
- 1:28:15a success in part on the EIA
- 1:28:18regulations. It was common ground that
- 1:28:20the burning of coal was an inevitable
- 1:28:22consequence of its extraction. It was
- 1:28:24just like Finch. So the court held that
- 1:28:26the um greenhouse gas emissions from the
- 1:28:28combustion of coal were a significant
- 1:28:30likely indirect effects of the project
- 1:28:31which needed to be assessed as part of
- 1:28:33the EIA process and that this was an
- 1:28:36obvious material consideration that the
- 1:28:38secretary of state was obliged to take
- 1:28:40into account in determination of the
- 1:28:42planning application.
- 1:28:44And then on um the substitution point
- 1:28:48again here the court found in favor of
- 1:28:49the claimants finding that the secretary
- 1:28:51of state's handling of the substitution
- 1:28:53issue was legally flawed both
- 1:28:55individually and cumulatively.
- 1:28:58So why is this decision interesting? So,
- 1:29:00aside from the fact that it applies
- 1:29:02Finch, I think it's interesting um from
- 1:29:05an environmental/planning
- 1:29:07law perspective in its own right because
- 1:29:10what we see here is the high court
- 1:29:12really grappling um with the
- 1:29:14substitution issue, which is a highly
- 1:29:16technical and complicated issue. And so,
- 1:29:19you're sort of seeing the the planning
- 1:29:20court's willingness and ability to
- 1:29:22engage with detailed technical evidence
- 1:29:25um in relation to the environment and
- 1:29:27climate change.
- 1:29:32So also we're talking about um caffin um
- 1:29:35which is the application of finch into a
- 1:29:38completely different factual context. So
- 1:29:42we've seen that it was an the LPA
- 1:29:44granted planning permission for an
- 1:29:45intense intensive poultry unit. Um and
- 1:29:48this would have housed 200,000 chickens
- 1:29:51and would have produced 2,600 tons of
- 1:29:53manure annually.
- 1:29:55The case largely considered the
- 1:29:57downstream use and processing of the
- 1:29:58manure and its likely impacts on water
- 1:30:01courses and habitats. Effectively, the
- 1:30:04claimant argued that the LPA had failed
- 1:30:05to adequately adequately address the
- 1:30:07environmental effects of spreading
- 1:30:09manure on third party land um for the
- 1:30:12purposes of the IPU's EIA. In
- 1:30:15particular, the claimment argued that
- 1:30:16the nitrate and phosphate content of the
- 1:30:18manure posed a likely indirect effect on
- 1:30:20water courses as manure generation um
- 1:30:23and use as fertilizer were inevitable
- 1:30:25consequences of the IPU.
- 1:30:29Um
- 1:30:31it was held in this case that the
- 1:30:33council had failed to engage in any
- 1:30:36evaluative assessment of whether as part
- 1:30:38of EIA the environmental impacts of
- 1:30:41spreading digesture which would be
- 1:30:43produced as a result of this um
- 1:30:44development
- 1:30:46um had to be quantified and taken into
- 1:30:48account. Um, and it's interesting
- 1:30:51because the court held that the
- 1:30:52spreading of digested is not
- 1:30:55automatically immune from EIA scrutiny
- 1:30:58when it may contribute to environmental
- 1:31:00impacts.
- 1:31:02So what's important here is that the
- 1:31:05court is effectively saying that the
- 1:31:06fatal flaw in this case was not the mere
- 1:31:08emission of data but was the complete
- 1:31:10sort of lack of evaluative reasoning by
- 1:31:14the local planning authority as to why
- 1:31:16this had been scoped out.
- 1:31:22Finally, we've got two airport DCO
- 1:31:24cases. Um, so not strictly looking at
- 1:31:27the environment and planning law, but
- 1:31:29it's planning law adjacent. Um, both
- 1:31:32have considered Finch. You have the
- 1:31:34Luton case and the Barkley case. We've
- 1:31:36seen one of these, but I'll go through
- 1:31:38both of them and show you what the uh
- 1:31:40how they are interconnected.
- 1:31:42So in Luton, which concerned a decision
- 1:31:45by the Secretary of State for Transport
- 1:31:47to grant a DCO for the expansion of the
- 1:31:49wonderful Luton airport, um the claimant
- 1:31:52argued that the Secretary of State er as
- 1:31:55one of the grounds um in excluding
- 1:31:57greenhouse gas emissions from inbound
- 1:32:00flights in the EIA. In particular, it
- 1:32:02said that the secretary of state erred
- 1:32:04in failing to assess the significance of
- 1:32:06indirect effects on the claimant uh
- 1:32:08contrary to the 2017 EIA regs and Finch
- 1:32:13and it was held that um it the secretary
- 1:32:17of state hadn't um because unlike Finch
- 1:32:20where the issue was whether greenhouse
- 1:32:22gas emissions were a direct or indirect
- 1:32:24effects, it was accepted in this case
- 1:32:27that emissions from inwardbound flights
- 1:32:30were likely effects of the development.
- 1:32:32So the issue really wasn't about whether
- 1:32:34there were direct or indirect indirect
- 1:32:37or direct effects at all. It was whether
- 1:32:39it was possible to make a meaningful
- 1:32:40assessment of significance when in
- 1:32:43accordance with national and
- 1:32:44international practice. The appropriate
- 1:32:47benchmarks um on emissions were all
- 1:32:49calculated um for outwardbound flights
- 1:32:53only rather than inwardbound flights to
- 1:32:55avoid double counting.
- 1:32:57So
- 1:32:59the court held that um the issue as to
- 1:33:01which benchmark to use to assess the
- 1:33:04effects of aviation emissions were
- 1:33:07ultimately a matter for the relevant
- 1:33:08decision maker to determine. So the test
- 1:33:11here is you're not really looking at the
- 1:33:12application of law. It's not an error of
- 1:33:14law. The test is actually a Wsbury one.
- 1:33:17Um and that is a ground that hadn't been
- 1:33:19advanced. There wasn't a Wsbury
- 1:33:20challenge on this ground.
- 1:33:23Um then looking at Barkley very briefly
- 1:33:28just because I'm aware of time. This
- 1:33:30concerned um a judicial review to the
- 1:33:31Secretary of State decision to make a
- 1:33:33DCO for the Gatwick Airport Northern
- 1:33:35Runway project which effectively enabled
- 1:33:38dual runway operations to operate uh at
- 1:33:41Gatwick by repositioning the um existing
- 1:33:44Northern Runway.
- 1:33:46So the Greater London Authority had
- 1:33:49accepted um sorry
- 1:33:53and provided an assessment of the
- 1:33:54emissions of international inbound
- 1:33:56flights in addition to international
- 1:33:58outbound flights. Um it had not
- 1:34:01previously assessed these because of the
- 1:34:04recognized approach which I'd already
- 1:34:05mentioned of excluding such flights to
- 1:34:07avoid double counting. Um and that was
- 1:34:09just among one of the reasons. Secretary
- 1:34:12of State accepted this and concluded
- 1:34:14there were um no meaningful benchmark
- 1:34:16against which to assess the greenhouse
- 1:34:18gas emissions of international inbound
- 1:34:20flights. The claimant argued that this
- 1:34:22was an unlawful approach adopt and
- 1:34:24adopted a misreading of Finch. Um Finch
- 1:34:27did not accept this was their case that
- 1:34:29the absence of a meaningful benchmark
- 1:34:31meant there could be no assessment of
- 1:34:32significance at all. But the judge
- 1:34:35rejected this interpretation of Finch
- 1:34:37and it was Lord Leget in that case
- 1:34:39accepted that um we've had Lord Leard
- 1:34:42obviously that the circumstances
- 1:34:44sorry accepted that circumstances may
- 1:34:46arise where considering whether an
- 1:34:49effect is significant may itself not be
- 1:34:51capable of meaning assessment.
- 1:34:54Um but here that there was not an
- 1:34:57appropriate benchmark for significance.
- 1:34:59Um
- 1:35:01so you can see here we've got these
- 1:35:04finches sort of spilling out now into
- 1:35:06the DCO context which quite interesting.
- 1:35:09Um and this particular issue of inward
- 1:35:12inbound flights um and their
- 1:35:14environmental effects and sort of the
- 1:35:16recognized approach in practice to how
- 1:35:18they should be assessed is sort of
- 1:35:19coming to the four. Um but these are the
- 1:35:21two most recent cases on this and that's
- 1:35:25everything from me. Um, I think we will
- 1:35:27be handing over for Q&A now. I know some
- 1:35:30Q&A's have been answered in writing, but
- 1:35:32if you have other Q&As's, feel free to
- 1:35:35send them over. Thank you.
- 1:35:38>> Thanks, Poppy. Um, thanks everybody. Um,
- 1:35:41yes, so if I can just ask the speakers
- 1:35:42to turn their cameras on for the uh
- 1:35:46question session. Um, we've had a few uh
- 1:35:50quite a few questions in. I'm going to
- 1:35:51go through them in the order in which
- 1:35:52they were asked. So I'm going to start
- 1:35:55the first um couple of questions I think
- 1:35:57um well the first one's for Ben. So Ben,
- 1:36:00uh, in relation to the, um, Reyond GM
- 1:36:04case, um, the question is, rather like
- 1:36:06permitted development, is it broadly
- 1:36:08fair to suggest, uh, another form of
- 1:36:10development permitted by an order such
- 1:36:13as an SDO or an LDO, um, uh, would be
- 1:36:17caught by the habitat's regulation
- 1:36:18simply because it creates the parameters
- 1:36:20for a development uh, and that is a
- 1:36:22distinguishable characteristic.
- 1:36:26>> Yes, thanks James. I mean, I think the
- 1:36:28answer to that is yes. So what the court
- 1:36:29said in the
- 1:36:31um beyond GM case they said this they
- 1:36:34said about the the PBA regulations that
- 1:36:36they establish a high level and general
- 1:36:39policy and regulatory framework. They
- 1:36:41are of general application throughout
- 1:36:43England. They thereby necessarily apply
- 1:36:46to all European sites within England but
- 1:36:48they do not have any nexus with any
- 1:36:50particular site. They do not identify,
- 1:36:53regulate or authorize any activity by
- 1:36:55reference to any particular European
- 1:36:57site. rather they establish a general
- 1:36:59regulatory framework within which future
- 1:37:01decisions may be taken about the release
- 1:37:04and marketing of PBO. So these were
- 1:37:07regulations that applied na nationally
- 1:37:09no particular nexus to any particular
- 1:37:11site um didn't didn't establish a
- 1:37:13framework for authorizing any particular
- 1:37:15activity affecting uh European sites. So
- 1:37:19it is these were very general
- 1:37:21regulations whereas there are others
- 1:37:23like an SDO or an LDO which authorize
- 1:37:26development directly or provide very
- 1:37:29specific parameters for the
- 1:37:30authorization of development and
- 1:37:32therefore allow you to establish some
- 1:37:35kind of nexus with European side. So it
- 1:37:38was it was both um the kind of
- 1:37:40generality of the application of the
- 1:37:42regulations and the fact that they
- 1:37:44didn't they didn't provide sufficient
- 1:37:46detail to even allow you to really carry
- 1:37:47out any assessment of the effects on
- 1:37:49European sites that meant that in this
- 1:37:51case they weren't plans or projects. I
- 1:37:53mean some examples of other things that
- 1:37:56have been found to be plans or projects.
- 1:37:58So uh national policy statements
- 1:38:01for DCO purposes um were accepted to be
- 1:38:06uh um uh plan or project in the together
- 1:38:10against size case. Um the grant of
- 1:38:12licenses for oil and gr gas extraction
- 1:38:14in the North Sea was was accepted to be
- 1:38:18um a plan or project by the secretary of
- 1:38:20state in in Oceanic review case. it was
- 1:38:23um October 2025 I think that was handed
- 1:38:26down um even though the licenses
- 1:38:29themselves don't didn't actually grant
- 1:38:31or authorize any particular activity um
- 1:38:33just just give just a grant of a legal
- 1:38:36right um so so I think the more the more
- 1:38:39closely connected you are to protected
- 1:38:42sites the more you actually regulate
- 1:38:44development and and then if you actually
- 1:38:45authorize a consent those things that
- 1:38:47get you much closer to being a plan
- 1:38:48project it's still quite quite a broad
- 1:38:50term but there are limits and obviously
- 1:38:53the claimants in the ambond GM found the
- 1:38:57limits and not not particularly
- 1:38:58surprised that they did given the nature
- 1:38:59of that particular scheme. Thanks Ben.
- 1:39:02And the other thing I think Ben just to
- 1:39:05to raise with you, you obviously raised
- 1:39:06the very interesting views by the um
- 1:39:08parliamentary committee on the on the
- 1:39:10virus
- 1:39:12um of those EDP
- 1:39:15regulations. But I mean presumably you
- 1:39:17you couldn't actually rely on what that
- 1:39:19parliamentary committee said in a
- 1:39:21judicial review. seeking to challenge
- 1:39:22those regulations because of article 9
- 1:39:24of the the bill of rights.
- 1:39:26>> Yeah, I think that's right. And you
- 1:39:28know, we've seen lots of interest in
- 1:39:30that issue by the speaker over the last
- 1:39:32sort of year or two. I don't think you
- 1:39:35could rely on that as evidence in um in
- 1:39:38a challenge, but it doesn't stop you
- 1:39:39from bringing a challenge to those
- 1:39:41regulations on the basis on which are
- 1:39:44set out by the report. But you couldn't
- 1:39:45rely on what's said in the report as any
- 1:39:47kind of evidence in support of your
- 1:39:48claim. No, because I mean although you
- 1:39:50wouldn't be questioning it, you'd be
- 1:39:52relying on it, it would put the
- 1:39:53defendant in the imposter position that
- 1:39:55they couldn't they couldn't question the
- 1:39:57proceedings in parliament and argue that
- 1:39:59it was actually lawful. So yeah, it's an
- 1:40:00interesting one. Okay, Nick, there's a
- 1:40:03couple of things for you. I think uh the
- 1:40:04first one is in terms of salami salami
- 1:40:07slicing. If an applicant chooses to
- 1:40:09separate aspects of the development and
- 1:40:11gain planning permission for them
- 1:40:12independently of the DCA regime,
- 1:40:16um uh is there an argument uh to be made
- 1:40:19that it should all be considered as one
- 1:40:21uh for EIA purposes?
- 1:40:24>> Uh
- 1:40:26I suppose yes, it depends entirely on
- 1:40:27the facts and the the various case laws
- 1:40:29being clear. It's a fact dependent
- 1:40:31question for the decision maker at the
- 1:40:32end of the day. Um so the the kind of
- 1:40:35factors that Lang outlines in Wingfield
- 1:40:37and the Court of Appeal endorsed in
- 1:40:39Ashurch are things like whether there's
- 1:40:40common ownership, whether there's
- 1:40:42simultaneous determinations,
- 1:40:44um functional interdependence, whether
- 1:40:46one part of the development couldn't
- 1:40:47function without another and or
- 1:40:50conversely whether a development is
- 1:40:52justified on its own merits and could be
- 1:40:53pursued independently of the other
- 1:40:55development coming forward. So I mean in
- 1:40:57the in the hypothetical way it's put yes
- 1:41:00there's an argument but whether there
- 1:41:02would whether it it would succeed or not
- 1:41:05is going to be very fact dependent. Um
- 1:41:08>> yeah yeah and then I think um question
- 1:41:11that might might be related in some
- 1:41:12ways. I think there was a question about
- 1:41:14um Ray Shaw um and whether the case
- 1:41:19concluded that the grid connection
- 1:41:21should have been part of the application
- 1:41:23considered in the EIA.
- 1:41:25No, it said go away and look at it again
- 1:41:27asking yourself the right question. The
- 1:41:28courts have been very clear that that's
- 1:41:30not for them what the project is. It's a
- 1:41:32decision maker question. So
- 1:41:33>> no, although my sense of the judgment is
- 1:41:35it does give a pretty strong indication
- 1:41:37that what the answer should be the
- 1:41:39judgment which is that they you know
- 1:41:40they should have assessed it and I
- 1:41:42suppose given the risks around this
- 1:41:44people are going to have to start
- 1:41:45assessing stuff like like that
- 1:41:47presumably.
- 1:41:47>> Certainly it's the more sort of
- 1:41:49precautionary thing to do. Um, and you
- 1:41:52know, if it's e relatively easy to do,
- 1:41:53then it just takes away one line of one
- 1:41:55line of objection that could be taken
- 1:41:56against you that the IIA is deficient.
- 1:41:58So, if it's easy to do, then no reason
- 1:42:00not to do it.
- 1:42:02>> Yeah. And then I think there was a there
- 1:42:03was a a further comment that came in
- 1:42:06um from from Michael Stallard saying
- 1:42:08that he understood the the EO road map
- 1:42:11is on pause with government and no
- 1:42:13progress has been made with it. I don't
- 1:42:14know whether you have any knowledge of
- 1:42:16whether that's right or not. I don't I
- 1:42:19don't I mean given there's been no
- 1:42:20update since March, it wouldn't surprise
- 1:42:22me, but I I don't have any firsthand
- 1:42:24knowledge of it.
- 1:42:24>> Yeah, it's been been a change of
- 1:42:26government since then, hasn't there? So,
- 1:42:27um you know um
- 1:42:29>> and MHLG's got, you know, a couple of
- 1:42:31things on their plate at the moment.
- 1:42:33>> Yeah, a few things. A few things. Okay.
- 1:42:35Uh thank you. Um so, um Odette, there's
- 1:42:39a few questions on um on um uh section
- 1:42:43106.
- 1:42:45So um we just pick those up. Um is there
- 1:42:50an expected time frame for how long
- 1:42:52prior decision is being made a 106
- 1:42:54should be published on a planning
- 1:42:55register other than not seven minutes?
- 1:42:58>> Um well there's nothing in the statutory
- 1:43:01provision. So it's essentially a matter
- 1:43:04of judgment and in the sort of seven
- 1:43:07minutes wouldn't probably be enough
- 1:43:08case. All the court did was give some
- 1:43:10guidance which essentially said it
- 1:43:12depends on the circumstances. It depends
- 1:43:14on the length of the agreement, its
- 1:43:16complexity,
- 1:43:18um matters such as that. So if it's very
- 1:43:20short, maybe maybe a day is okay. But
- 1:43:23there's no there's no there's no
- 1:43:24guidance really. It's a fact fact
- 1:43:26sensitive analysis of each case
- 1:43:28unfortunately.
- 1:43:30>> Yeah. And then I think there was a
- 1:43:31question about whether the publication
- 1:43:33requirements apply to the inspector's
- 1:43:35final determination at a at a pee.
- 1:43:38>> Yeah. My I mean my understanding is that
- 1:43:40until it's finally disposed of the
- 1:43:42council does have an obligation to keep
- 1:43:43publishing on its website whatever it's
- 1:43:45got.
- 1:43:46>> Yeah. Although presumably I mean if you
- 1:43:50it would be very hard to challenge the
- 1:43:52inspector's decision on the basis the
- 1:43:53council haven't it given that it's being
- 1:43:55discussed at a public inquiry. I think
- 1:43:57that would probably dispose of the
- 1:43:58challenge. So I mean technically there
- 1:44:00might be a breach but it probably
- 1:44:01wouldn't go anywhere. Um, and then I
- 1:44:04mean I think you um you probably um um
- 1:44:08opened up a Pandora's box by talking
- 1:44:10about the um the pins guidance um which
- 1:44:13obviously there's been quite a lot of
- 1:44:15stuff out uh um on on recently in
- 1:44:17relation to um the well frankly
- 1:44:21preposterous idea that you have to
- 1:44:23submit um a section 106 with the
- 1:44:26planning application. I mean, for a
- 1:44:27start, most legal authorities insist
- 1:44:29that they do the first draft, and we
- 1:44:30know, as you said, they're never going
- 1:44:31to actually do one if they're intending
- 1:44:33to refuse you. Um, I mean, I think for
- 1:44:36my part, um, I think pins have lost
- 1:44:38sight of two two things. I mean, one is
- 1:44:41the procedural guide is a guide. It is
- 1:44:43not rules. They cannot use it to impose
- 1:44:46rules. Um, and there are some useful
- 1:44:48inspector decisions saying, you know,
- 1:44:50don't treat the guide as rules. It's not
- 1:44:52it's not rules. And the second thing is
- 1:44:54you know they're not able through the
- 1:44:56guide to do things which are uh unfair
- 1:45:00um and um you know procedurally um
- 1:45:04defective and frankly uh I think if
- 1:45:07anyone were to lose an appeal um because
- 1:45:11they hadn't complied with this guidance
- 1:45:14they'd have a very strong prospect of
- 1:45:15challenging that on the basis of of
- 1:45:17fairness. I mean pins is supposed to be
- 1:45:19based on the Frank's principles which
- 1:45:20includes fairness. Um, but I think
- 1:45:23someone's lost sight of that uh
- 1:45:24somewhere in the line. But anyway,
- 1:45:26that's my own my own not very strong
- 1:45:28views on the subject. Um, I mean it
- 1:45:30needs to come out the procedural guide.
- 1:45:32It's it's complete nonsense and it needs
- 1:45:34to come out and uh hopefully it will.
- 1:45:36>> Yes.
- 1:45:37>> Um, so um there are I think there was
- 1:45:40another uh let's just have a look. I
- 1:45:42think there may have been another
- 1:45:44>> there was one question about whether um
- 1:45:46you could get costs awarded for a
- 1:45:47council who didn't engage. So I mean the
- 1:45:50appeals PPG
- 1:45:52does say that in respect of the appeals
- 1:45:55part of the process lack of cooperation
- 1:45:58and delay in adhering to deadlines is a
- 1:46:01potential ground for cost. So if it's
- 1:46:03during the appeal itself and the
- 1:46:04council's not engaging at all and that
- 1:46:07leads to delay or you know potentially
- 1:46:10on a procedural basis you'd have to show
- 1:46:12that you had been put to expense that
- 1:46:16was wasted. Um, so it's sort of
- 1:46:18factually dependent, but but yes, if the
- 1:46:20council is totally refusing to engage
- 1:46:22during the appeals process, it's it's a
- 1:46:25potential avenue to look at.
- 1:46:28>> Yeah. Okay. Um,
- 1:46:32thank you. And then, um, I I think there
- 1:46:34might have been some other questions
- 1:46:35come in. I don't have a look at those
- 1:46:36today. We'll come come back to them if
- 1:46:38if you can see them on on your screen,
- 1:46:39but I'll I'll pass over them for now. um
- 1:46:42and ask um I think there were um so um
- 1:46:47um I think Margaret you may have
- 1:46:49answered one um uh in in in writing um
- 1:46:54but there is um a further question I
- 1:46:56think which says um thank you for your
- 1:46:59reply on downstream effects of livestock
- 1:47:01unit developments aside from the
- 1:47:02off-site disposal of manure do you think
- 1:47:05it would be reasonably expected for
- 1:47:06other effects such as greenhouse gas
- 1:47:08emissions arising from the
- 1:47:09transportation processing or sale etc.
- 1:47:12of animals and meat products to also be
- 1:47:14covered uh in the EIA.
- 1:47:20>> That's a very good question. I think it
- 1:47:23requires engaging with um the Supreme
- 1:47:25Court's judgment in Finch and what the
- 1:47:27court says about uh causality there. So
- 1:47:31the core question I think sort of what
- 1:47:32the Supreme Court helped with there is
- 1:47:34that it simplified the approach. the
- 1:47:35court of appeal had adopted an approach
- 1:47:36that added complexity in in seeking to
- 1:47:39assess the likelihood or otherwise of
- 1:47:41particular effects. Um so the best way
- 1:47:44to look at it is looking at whether uh
- 1:47:46the emissions uh that might result say
- 1:47:49from from transporting or the like are
- 1:47:51an inevitable consequence of the uh
- 1:47:54development that is being approved. and
- 1:47:58and and if if the conclusion if the if
- 1:48:00if a reasonable if it is reasonable
- 1:48:02conclude to conclude that they are and
- 1:48:04that there's no intervening uh step that
- 1:48:06might break that causality then I think
- 1:48:08it would be prudent to to assess them.
- 1:48:11um that doesn't necessarily mean that um
- 1:48:15the significance or otherwise of those
- 1:48:18emissions inevitably mean that the
- 1:48:19proposal should not go ahead. But I
- 1:48:21think it's it's probably safer to to
- 1:48:24assess uh any any effects uh including
- 1:48:27GHG emissions that are inevitably going
- 1:48:30to result from from a proposal. So it
- 1:48:33depends on the facts of the specific
- 1:48:34proposal. Um but um if if they are a
- 1:48:40connected uh effect then then I would I
- 1:48:43would consider it prudent to include
- 1:48:45them. I think the the distinction the
- 1:48:47Supreme Court draws between oil and gas
- 1:48:49and iron and steel is a very helpful
- 1:48:52factual example of what is a direct or
- 1:48:56indirect effect and what is not um a
- 1:48:59direct or indirect effect because
- 1:49:00there's a sort of a sort of a whole set
- 1:49:03of intervening uh steps um for instance
- 1:49:06the production of steel um that that
- 1:49:09break that causality.
- 1:49:11>> Thank you. And then there's um um
- 1:49:13there's a further question which I think
- 1:49:15possibly would be either either both of
- 1:49:18you and and Poppy
- 1:49:20um
- 1:49:22effectively saying given the the Finch
- 1:49:24judgment's emphasis on assessing
- 1:49:27uh likely significant environmental
- 1:49:29effects um down downstream and upstream
- 1:49:33um could that have implications um for
- 1:49:37um local plan making uh and the 30-month
- 1:49:41time limit that you've got for getting
- 1:49:43everything together and getting your
- 1:49:45plan in plan in place. I mean, I guess
- 1:49:47there's several questions. I mean, one
- 1:49:48is to the extent to which Finch applies
- 1:49:50within SEA as well as EIA. Um, which,
- 1:49:54you know, is is one element of it. Um,
- 1:49:57but secondly, I mean, I guess it's
- 1:49:58what's been driven out by the question
- 1:50:00is the practical difficulties that Finch
- 1:50:03has given rise to. Um and frankly the
- 1:50:06more case law that comes out the more I
- 1:50:08look at it and think Lord Sales was
- 1:50:11entirely correct uh in his judgment but
- 1:50:14that's my own view. Um the practical
- 1:50:16difficulties you know are not going to
- 1:50:17get smaller but I don't know whether
- 1:50:18either Poppy or Margarita have you any
- 1:50:20thoughts on on that
- 1:50:23>> only to say the same thing about the
- 1:50:24practical difficulties. Yeah I don't see
- 1:50:26how
- 1:50:27>> it's a tight time limit. Um yeah no I
- 1:50:31mean
- 1:50:31>> quite difficult.
- 1:50:38Okay. Um
- 1:50:40and um I don't know was there any other
- 1:50:43questions that we needed to pick up on
- 1:50:44yours or are you happy that we've
- 1:50:45covered covered those?
- 1:50:50>> Um there was there's just one
- 1:50:52um that says there confirming um was I
- 1:50:57confirming that the section 106 must be
- 1:50:59submitted prior to determination. Is
- 1:51:01that is that correct? Um, so I think two
- 1:51:06two different branches to that depending
- 1:51:09where you're at with the council. So if
- 1:51:10the council is going to approve you,
- 1:51:13obviously you do need to submit it prior
- 1:51:14to determination and it needs to be
- 1:51:16published on the council's website.
- 1:51:17That's the whole point of regulation 43.
- 1:51:21Um, if you're being refused, the PIN's
- 1:51:23guidance that James and I were talking
- 1:51:24about is now saying nonetheless, you
- 1:51:27should have a section 106
- 1:51:29prior to determination, but you might
- 1:51:31not have the ability to do that. Um, the
- 1:51:35safest thing with the new guidance in
- 1:51:37place is to try and submit it prior to
- 1:51:39determination. Um, because then there's
- 1:51:41no chance of getting into a dispute with
- 1:51:44pins down the line. But as James says,
- 1:51:45we we think it's unlikely that actually
- 1:51:48people are going to end up with refusals
- 1:51:49on the basis so we submitted the 106
- 1:51:52with the appeal for the first time. Um
- 1:51:54but safest way forward is to do it as
- 1:51:56early on in the process as possible. So
- 1:51:58there's no discussion about it.
- 1:52:01>> Yeah. And I mean I guess in some ways it
- 1:52:03doesn't really matter what you submit as
- 1:52:06long as you submit a section 186 because
- 1:52:08if you don't have to change on appeal
- 1:52:09because the council asks for different
- 1:52:11things, you can hardly be criticized. I
- 1:52:13mean I know it says I think the gu
- 1:52:14doesn't final version but I mean that's
- 1:52:16obviously just you know I mean that that
- 1:52:18that that's I think madness lies in that
- 1:52:20direction. So you can really possibly do
- 1:52:23that. Um so actually all that would
- 1:52:25really matter was you put something in.
- 1:52:26You can say oh yeah there's my 106 that
- 1:52:28ticks that box and then obviously it's
- 1:52:30going to change in the course of the
- 1:52:31appeal the appeal process. But I mean I
- 1:52:34do understand why pins is trying to
- 1:52:37drive efficiency in its decision-m but
- 1:52:40um sometimes um one goes back to um to
- 1:52:44Lord Akin about administrative
- 1:52:46convenience and fairness don't always um
- 1:52:48go go together and I'm afraid that's
- 1:52:51where I think we're heading on that. But
- 1:52:54um thank you very much to all of our um
- 1:52:57speakers and thank you um to everyone
- 1:52:59who's joined. I hope you found it um
- 1:53:01useful and um uh I look forward to
- 1:53:05seeing you for um some of the later uh
- 1:53:07sessions in this in this series. Thank
- 1:53:09you very much.
About this transcript
This page contains the full transcript of Planning High Court Challenges webinar session 1: Planning and environmental issues by Landmark Chambers, generated from the public captions YouTube serves with the video. The transcript has 18,663 words across 2,888 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.