  1. 0:28Good evening ladies and gentlemen.
  2. 0:29Good evening everyone and welcome to the
  3. 0:31New City of Kingston Planning Board
  4. 0:33meeting.
  5. 0:34My name is Suzanne Cahill. I'm the
  6. 0:36Planning Director of the Board of the
  7. 0:37City of Kingston.
  8. 0:39Before we start the meeting, I just have
  9. 0:40a few quick announcements that I want to
  10. 0:42go over. If you do have a cell phone,
  11. 0:44I'm just going to ask that you please
  12. 0:46put it on silent so that it doesn't
  13. 0:48interfere
  14. 0:49with any of the meeting discussion
  15. 0:51that's going on.
  16. 0:53I want to let everybody know that this
  17. 0:56meeting is being recorded and is being
  18. 0:58live-streamed. So, please please be
  19. 1:00respectful of that.
  20. 1:02If we have an emergency, they ask that
  21. 1:04you please use the stairs not the
  22. 1:05elevator. If you need assistance, please
  23. 1:08ask us. We will help you.
  24. 1:10The restrooms are through the chambers
  25. 1:13and on the opposite side. As you go
  26. 1:15through, men's will be to the left,
  27. 1:17women's to the right. And if you have
  28. 1:21any conversations outside of those
  29. 1:24happening with the board, we just ask
  30. 1:26that you have them outside of the room
  31. 1:28so that you're not interfering with
  32. 1:30other discussions that are going on.
  33. 1:32With that, I am going to turn it over to
  34. 1:36our standing chair, Matt Belles, for
  35. 1:38this evening to introduce the rest of
  36. 1:40the board members and staff that are
  37. 1:42present.
  38. 1:44>> Well, good evening folks. Thank you.
  39. 1:46So, tonight we have Planning Board
  40. 1:48member Kyra Raji,
  41. 1:50Vincent Archer,
  42. 1:52Andrew Harris,
  43. 1:54and then It's Cahill, Planning Director,
  44. 1:56Kyla
  45. 1:58and then older person cats in the back.
  46. 2:02So
  47. 2:05First item that the adoption of the
  48. 2:08September 22nd, 2026 Planning Board
  49. 2:11meetings that everyone's had a chance to
  50. 2:12review.
  51. 2:13Any additions, corrections?
  52. 2:17No.
  53. 2:18Motion to approve. Andrew Harris.
  54. 2:21All in favor.
  55. 2:23>> I'll second.
  56. 2:24>> I'll second.
  57. 2:25>> Thank you.
  58. 2:26>> All in favor.
  59. 2:28Okay, we are good.
  60. 2:30We are going to shuffle a couple agenda
  61. 2:33items around just for efficiency this
  62. 2:36evening.
  63. 2:37Um
  64. 2:38Get back to it.
  65. 2:40409 East Chester Street. If you guys
  66. 2:43could come up to the
  67. 2:49>> Yes, thank you.
  68. 3:01>> It's number 10.
  69. 3:03>> Yeah.
  70. 3:28>> Okay,
  71. 3:29item 10 tonight, number 409 East Chester
  72. 3:32Street. It's a major waiver request to
  73. 3:35increase the build two zone and decrease
  74. 3:38the rear yard setback. SBL
  75. 3:4148.75-9-10.100.
  76. 3:46Secret determination.
  77. 3:48That's
  78. 3:51>> It's
  79. 3:51>> Type-o.
  80. 3:53>> Trans-tech zone
  81. 3:55>> and ward 7, Winston and Tracy and Daly,
  82. 3:59applicant owners.
  83. 4:02If you guys just quick intro for the
  84. 4:04record.
  85. 4:05>> I'm Tracy Ann and this is the
  86. 4:07>> Winston, welcome.
  87. 4:09So, you guys are seeking a building
  88. 4:12permit to construction addition onto
  89. 4:13your home?
  90. 4:14>> Yes.
  91. 4:15>> Okay.
  92. 4:16Um
  93. 4:18So, we have referred this to the uh
  94. 4:20zoning enforcement. Uh two waivers were
  95. 4:22identified due to the location of the
  96. 4:24addition. Just want to give us a quick
  97. 4:26overview of what you're looking to do.
  98. 4:29>> So, the main thing that we wanted to do
  99. 4:31was to put in another playroom because
  100. 4:33of our parents
  101. 4:34and um we have a non-verbal
  102. 4:38uh you know, home. He have a non-verbal
  103. 4:412-year-old.
  104. 4:42Um autistic and he
  105. 4:45He needs sensory So, he's always moving,
  106. 4:48jumping.
  107. 4:49And the living room is about our current
  108. 4:52bedroom and there's no rest for us.
  109. 4:55>> Okay.
  110. 4:56>> So, the main thing was to put in
  111. 4:57additional um
  112. 4:59playroom. Also, my parents are living
  113. 5:01with us and the room they're now using
  114. 5:03is very small.
  115. 5:05And my mom-in-law has arthritis, so we
  116. 5:07wanted to do a
  117. 5:09bigger room also.
  118. 5:10And so, that's how we came up with the
  119. 5:13addition.
  120. 5:14And then we decided to put one room just
  121. 5:16in case if we have family visits. So,
  122. 5:19come visit.
  123. 5:20>> Is it Is it something attached?
  124. 5:21>> So, then essentially what they're doing
  125. 5:23is they're following the current
  126. 5:25building form because of the building
  127. 5:28lines versus having to bring it more
  128. 5:31like towards the street, which is a busy
  129. 5:33street, and keeping it in line and just
  130. 5:37extending to the side.
  131. 5:38>> Yes.
  132. 5:39>> They might put a door.
  133. 5:41>> We need
  134. 5:41>> We need We need to leave a little bit of
  135. 5:43openings.
  136. 5:45>> Okay.
  137. 5:46>> So, where
  138. 5:48So, the parents are living
  139. 5:50>> Yes, I have a question.
  140. 5:52>> So, for our waiver checklist, so board
  141. 5:56will go through these questions with a
  142. 5:57yes or no
  143. 5:59uh to help make our determination. So,
  144. 6:02the applicant has included a waiver
  145. 6:03request letter that clearly identifies
  146. 6:05and describes the waiver being proposed
  147. 6:08accompanied by plans and other visual
  148. 6:10representations as applicable.
  149. 6:13>> Yes.
  150. 6:16I [clears throat] ask
  151. 6:18Yes.
  152. 6:18>> Uh
  153. 6:19in their letter, the applicant describes
  154. 6:21in detail why the waiver is needed and
  155. 6:23how the waiver request is consistent
  156. 6:25with the intent, design, and
  157. 6:26compatibility of the transect zone in
  158. 6:29which the project is located.
  159. 6:32>> Yes.
  160. 6:32>> Yes.
  161. 6:37>> Will granting the waiver contribute to
  162. 6:39the realization of the overall intent of
  163. 6:41the transect zone helping an improved
  164. 6:43project which will be an attractive and
  165. 6:45durable contribution to the transect
  166. 6:47zone?
  167. 6:48>> Uh I forgot.
  168. 6:51>> Uh we have yes or no.
  169. 6:53>> Yes.
  170. 6:54>> Yes.
  171. 6:58>> Uh to support walkable neighborhoods and
  172. 7:01or mixed-use centers, the project
  173. 7:03emulates the neighborhood context
  174. 7:05for how far the building buildings
  175. 7:07relate to the sidewalk, how the facade
  176. 7:09is designated, and how the building
  177. 7:11interacts with the street.
  178. 7:15>> Yeah, yes. The shape was changed.
  179. 7:17>> Yes, get continuation.
  180. 7:21The project supports a green and
  181. 7:22resilient future, for example, by
  182. 7:24reducing vehicular miles traveled,
  183. 7:26providing green infrastructure and or
  184. 7:28street trees, and or including
  185. 7:30high-quality usable open space.
  186. 7:33>> Same applicable to that.
  187. 7:37>> Project supports incremental development
  188. 7:40patterns in its size and density that's
  189. 7:42the towards infill development or the
  190. 7:44reuse of existing buildings.
  191. 7:47>> Yeah. Yes. Yes, then.
  192. 7:50>> The project supports the provision of a
  193. 7:52variety of housing types to support a
  194. 7:54range of income levels, age groups, and
  195. 7:56family units.
  196. 7:57>> Yeah, I would like the opinion.
  197. 8:00>> The project specifies street design that
  198. 8:02is walkable, bikeable, and will
  199. 8:04reinforce safe, comfortable environments
  200. 8:07for all users.
  201. 8:08>> I did.
  202. 8:11Okay.
  203. 8:12>> So,
  204. 8:13>> I think it works, but
  205. 8:15>> We're good for the waiver.
  206. 8:16>> Yeah.
  207. 8:17>> Um so, it just both my eyes those type
  208. 8:19two.
  209. 8:20>> Okay, this is
  210. 8:22a type two in seeker, and then do we
  211. 8:25have to do a motion and
  212. 8:26>> Yeah, no objection to approve the
  213. 8:28waiver.
  214. 8:28>> Who would like to make the motion?
  215. 8:30Andrew, second? Kyra.
  216. 8:32All in favor?
  217. 8:34>> I.
  218. 8:34>> Opposed?
  219. 8:36Okay, passed.
  220. 8:38>> Thank you.
  221. 8:41You're all good.
  222. 8:42>> We can leave?
  223. 8:43>> Yeah.
  224. 8:55It's 95 Wilson Avenue, correct?
  225. 8:58All right, may I go first? Please come
  226. 8:59on up.
  227. 9:12Welcome.
  228. 9:13If we can just get your names for the
  229. 9:14record.
  230. 9:16>> Steve Sumida.
  231. 9:18>> Okay, welcome.
  232. 9:26So, item 11, 95 Wilson Avenue, major
  233. 9:30waiver request to install a larger curb
  234. 9:33cut than permitted. Uh, SBL 48.269-4-8.
  235. 9:39Secret determination. Uh, it's type two.
  236. 9:43>> Yes.
  237. 9:43>> Okay. Transit zone, T3N, ward six.
  238. 9:48Um, and um,
  239. 9:49So, pronunciation of your name?
  240. 9:51>> Kind of like the bird.
  241. 9:53>> Twee. And Steve Shoemaker, the applicant
  242. 9:56voters.
  243. 9:57Um,
  244. 9:58the applicant is for major waiver for
  245. 10:00section 405.16.e.3,
  246. 10:03which limits the maximum current cut to
  247. 10:0610 ft for a single-family home.
  248. 10:09Um,
  249. 10:10remove the existing driveway to add a
  250. 10:12pool and fenced-in yard. We're now
  251. 10:13looking to relocate the driveway to
  252. 10:15accommodate an off-street space for the
  253. 10:17vehicle. Um, guys, just give us a quick
  254. 10:20overview.
  255. 10:22>> Sure. Um,
  256. 10:23we started this process
  257. 10:25a little over a year ago.
  258. 10:27Um,
  259. 10:28we installed a pool, and we wanted to
  260. 10:30move the driveway 12 ft from the
  261. 10:32original
  262. 10:33area where it was.
  263. 10:34>> Okay.
  264. 10:36>> So, yeah, if you see it with the
  265. 10:37driveway, it was kind of was more over
  266. 10:39towards the pool.
  267. 10:41So, we wanted to move the driveway. It
  268. 10:43would be if you
  269. 10:45it's on the way towards Wilson about 12
  270. 10:47ft over over where it originally was.
  271. 10:51And and um, we're you know, we're asking
  272. 10:52for a reasonable accommodation cuz we
  273. 10:53have a adult son with autism.
  274. 10:56Um, we first initially applied for the
  275. 10:59permit.
  276. 11:01Um, they required us to get a survey,
  277. 11:02which we didn't do.
  278. 11:05But, it's very confusing because
  279. 11:08in the emails we've had with the build
  280. 11:10codes office,
  281. 11:13they said we didn't need a permit.
  282. 11:16And the DPW would have to give us five
  283. 11:18for a permit for them initially, which
  284. 11:21Mr. Coons came out.
  285. 11:23I would say it was probably in June of
  286. 11:25last year. He did a site survey.
  287. 11:28And he said there isn't any issues with
  288. 11:30the driveway now. And beyond it wasn't
  289. 11:32as large as the initial was, you know,
  290. 11:34with with where the driveway was to be
  291. 11:35moved and eventually probably because it
  292. 11:37was
  293. 11:38from the curb it was 15, possibly 15 ft
  294. 11:40in the curb, and this is the way it was
  295. 11:41set.
  296. 11:43Um
  297. 11:45so we're going to survey, going to get a
  298. 11:46survey done until the beginning of this
  299. 11:48year, and
  300. 11:50I am kind of dumbfounded why I hadn't
  301. 11:54even get a survey.
  302. 11:56Um it's contextual to the adjacent
  303. 11:58properties still have wide driveway.
  304. 12:02Some of them built them in recent years,
  305. 12:03so it's not grandfathered. Some of them
  306. 12:05been handed on to.
  307. 12:07We've consulted with some of the
  308. 12:08neighbors, never had to require a
  309. 12:09survey.
  310. 12:10But primarily, like I said, what we're
  311. 12:12doing the uh
  312. 12:14the alterations to our home is because
  313. 12:16of our our oldest son, who's 23, with
  314. 12:18severe autism.
  315. 12:20And uh we're currently parked on the
  316. 12:22street, and we haven't been able to do
  317. 12:24anything until we resolve this, and it's
  318. 12:26very unsafe.
  319. 12:28We you know, for him to go out on the
  320. 12:29street because sometimes he he's
  321. 12:31anxious.
  322. 12:32You know, getting in and out of the car,
  323. 12:34you know, sensory needs, sometimes he
  324. 12:36he you know, he has a little anxiety and
  325. 12:38everything, and we even actually had two
  326. 12:40letters thrown in our yard com- that's
  327. 12:42complaints over the last, let's say, 6
  328. 12:45months.
  329. 12:46You know, anonymous letters get kind of
  330. 12:48really
  331. 12:49you know, uh degrading us and stuff
  332. 12:50about us and our situation, about, you
  333. 12:52know, parking on the street with a child
  334. 12:54having a kid with a
  335. 12:55a child with a condition, you know,
  336. 12:57you're you're not a good parent. So, you
  337. 13:00know, uh we did consult with an
  338. 13:02attorney, and of course they felt like
  339. 13:05we would be better off applying for a
  340. 13:06reasonable accommodation and to see if
  341. 13:08we can get this resolved. We
  342. 13:11>> Basically, just so there's an under-
  343. 13:13Just so the board has a little bit of
  344. 13:15background, residential properties are
  345. 13:17allowed more than 10 ft wide per car.
  346. 13:20They're asking for a per car that's
  347. 13:22larger than typical would be for a
  348. 13:25normal residential use, but they did in
  349. 13:28their application also provide
  350. 13:30representative examples of other
  351. 13:32properties within close proximity that
  352. 13:35have the same type of double wide
  353. 13:37driveways. So,
  354. 13:38it's a pretty
  355. 13:40standard regular task.
  356. 13:52>> Would there be any issue with not
  357. 13:54approving this?
  358. 13:56>> Okay. So, do you need to just go through
  359. 13:57the checklist?
  360. 14:20>> The applicant has included a waiver
  361. 14:22request letter that clearly identifies
  362. 14:23and describes the waiver being proposed,
  363. 14:25accompanied by plans and other visual
  364. 14:27representations as applicable.
  365. 14:29>> Yes.
  366. 14:31>> Yes.
  367. 14:33Uh
  368. 14:33in their letter,
  369. 14:34the applicant describes in detail why
  370. 14:36the waiver is needed and how the waiver
  371. 14:38request is consistent with the intent,
  372. 14:40design, and compatibility of the
  373. 14:42transect zone in which the project is
  374. 14:44located.
  375. 14:45>> Yes.
  376. 14:45>> Yes.
  377. 14:47Uh will granting the waiver contribute
  378. 14:49to the realization of the overall intent
  379. 14:51of the transect zone and result in a
  380. 14:53improved project which will be an
  381. 14:55attractive and durable contribution to
  382. 14:57the transect zone.
  383. 14:59>> Yes.
  384. 15:02>> To support walkable neighborhoods and or
  385. 15:04mixed-use sectors, the project emulates
  386. 15:07the neighborhood context for how the
  387. 15:08building buildings relate to the
  388. 15:10sidewalk, how the facade is designed,
  389. 15:12and how the building interacts with the
  390. 15:14street.
  391. 15:15>> Yes.
  392. 15:16>> I'm going to go with that, but
  393. 15:18Vince, yes.
  394. 15:20Yes.
  395. 15:22Uh the project supports a green and
  396. 15:24resilient future
  397. 15:26uh by for example reducing vehicular
  398. 15:28miles traveled, providing green
  399. 15:30infrastructure, and or street trees, and
  400. 15:32or including high-quality usable open
  401. 15:35space.
  402. 15:37>> Not applicable to me.
  403. 15:38>> Yeah, in a day.
  404. 15:40Uh the project supports incremental
  405. 15:42development patterns in its size and
  406. 15:44density and supports an infill
  407. 15:46development or the reuse of existing
  408. 15:48buildings.
  409. 15:52>> In a day.
  410. 15:56>> Project supports the provision of a
  411. 15:57variety of housing types to support a
  412. 15:59range of income levels, age groups, and
  413. 16:02family units.
  414. 16:05Project specifies street design that is
  415. 16:07walkable, bikeable, and will reinforce
  416. 16:09safe and comfortable environments for
  417. 16:11all users.
  418. 16:13>> Yes, I'll complain.
  419. 16:15>> Yes.
  420. 16:16>> In a day.
  421. 16:18>> Uh
  422. 16:19Oops, sorry.
  423. 16:20>> You got one vote for this.
  424. 16:21>> So,
  425. 16:22you're not applicable to that?
  426. 16:24Or for the same
  427. 16:27looking at 50 cents in Seattle.
  428. 16:29>> I think it's in a
  429. 16:31>> You think it's not applicable?
  430. 16:32>> Yeah.
  431. 16:33>> Well, you're now
  432. 16:34The reason why you said it last is
  433. 16:36because it's
  434. 16:38The only person that's not
  435. 16:40>> [clears throat]
  436. 16:40>> able to
  437. 16:44be safe
  438. 16:45and use the environment comfortably is
  439. 16:47our son.
  440. 16:49So, this would include him.
  441. 16:52And therefore, it would be
  442. 16:55specific to the walkable
  443. 16:58area which is the
  444. 16:59curb cut on the sidewalk.
  445. 17:06>> So, you're going to have to take a vote
  446. 17:09of
  447. 17:09one on
  448. 17:11the total overall
  449. 17:13waiver.
  450. 17:17>> Okay. So, um
  451. 17:20I guess we're going to do a board vote
  452. 17:22and then approve the waiver?
  453. 17:24>> And then we got motion.
  454. 17:26>> Make a motion.
  455. 17:27Um to approve this waiver.
  456. 17:30>> Yep.
  457. 17:30>> Yes, second.
  458. 17:31>> Second.
  459. 17:32>> Okay.
  460. 17:33All right, I.
  461. 17:34>> I.
  462. 17:36>> Okay, opposed?
  463. 17:38>> That's okay.
  464. 17:39>> I vote yes.
  465. 17:40>> Okay.
  466. 17:40>> Okay.
  467. 17:40>> So, it's approved.
  468. 17:42>> Right.
  469. 17:55You good?
  470. 17:56>> Okay.
  471. 17:57>> All right, may I have a motion to
  472. 17:58adjourn?
  473. 18:00>> And then can we do the meeting on Zoom?
  474. 18:02>> Baby Paul.
  475. 18:08>> Uh item number two, 370 Albany Avenue,
  476. 18:13public hearing for administrative
  477. 18:14special permit renewal to operate a car
  478. 18:16wash.
  479. 18:18Is anyone here for 370?
  480. 18:21>> Which is 370?
  481. 18:22>> They need to be here to speak.
  482. 18:23>> Oh, to speak on 370 Albany Ave.
  483. 18:29>> I'm ready to close the public hearing to
  484. 18:31you.
  485. 18:32>> You make a motion to close?
  486. 18:34>> Yep.
  487. 18:34>> All right, motion to close the public
  488. 18:36hearing at 370.
  489. 18:38And you second.
  490. 18:39I motion then second.
  491. 18:53>> Second and you can get out.
  492. 18:54>> All righty, let's
  493. 19:05All right, 713 Gerald Street,
  494. 19:08subdivision of lands of Travis Myers,
  495. 19:10SBL 56.357-14-2.
  496. 19:16seeking a determination type two trans x
  497. 19:18zone T4N ward seven.
  498. 19:23Travis Myers applicant's owner.
  499. 19:26Is anyone here for 713 Gerald Street?
  500. 19:35>> And that piece of land so
  501. 19:38basically what this one is and if you
  502. 19:41recall
  503. 19:43about a year or so ago we reviewed a
  504. 19:46application to combine two parcels into
  505. 19:48one. He had a proposal to develop a four
  506. 19:52unit row house type of structure.
  507. 19:56Financially that has economically become
  508. 19:59unfeasible for him. So he is now
  509. 20:03reverting back wanting to separate the
  510. 20:05parcels again. He's going to sell one
  511. 20:07off and retain the other.
  512. 20:10Pretty straight forward here. We'll need
  513. 20:11some
  514. 20:15>> Any questions from the board?
  515. 20:18>> Yes,
  516. 20:19this is unlisted.
  517. 20:23>> Right. So it's good
  518. 20:26make a motion to
  519. 20:28>> I make a motion to place it on
  520. 20:30action.
  521. 20:30>> So this is an unlisted action.
  522. 20:33>> I make a motion
  523. 20:34>> What else?
  524. 20:34>> I make a motion to approve the
  525. 20:36>> It's already.
  526. 20:48This looks to be in order.
  527. 20:50I'll make a motion to accept the short
  528. 20:53environmental assessment form.
  529. 20:55Vince Andrews seconds.
  530. 20:58All approved.
  531. 21:00Opposed.
  532. 21:04>> I make a motion to sign the best.
  533. 21:06>> No, they are often made
  534. 21:26>> You saw any Are there any questions on
  535. 21:28this?
  536. 21:29I'm not Well, I would need What's that?
  537. 21:32So, we will need five paper copies, one
  538. 21:36minor.
  539. 21:38You don't need time to read the other
  540. 21:39instructions.
  541. 21:41The board um
  542. 21:45They can be signed and we will need
  543. 21:49uh
  544. 21:50the owner's signature
  545. 21:53before the chairman and sign off on it.
  546. 21:57Found last.
  547. 22:00And for policy six.
  548. 22:02>> Okay.
  549. 22:02>> Those are the additions.
  550. 22:07>> Yeah.
  551. 22:10>> That was my question.
  552. 22:12>> Right.
  553. 22:12>> Um motion to approve this?
  554. 22:15Andrew, second.
  555. 22:18Karin.
  556. 22:20All in favor?
  557. 22:21Opposed?
  558. 22:23>> All right.
  559. 22:23>> It's passed.
  560. 22:25>> Thanks.
  561. 22:28Chairman.
  562. 22:28>> All right. And we have Fagus, 79 German
  563. 22:31Street.
  564. 22:34Um so, good evening. We're going to hang
  565. 22:37on one sec. So, this is a subdivision of
  566. 22:39lands of
  567. 22:41uh
  568. 22:42three FFRE LLC and a major waiver for
  569. 22:46rear yard setback.
  570. 22:48SBL 56.42-14-21.
  571. 22:52Uh secret determination type two.
  572. 22:56It's correct zone. Transaxle.
  573. 22:58>> Oh, I'm listed. Sorry.
  574. 22:59>> I'm listed.
  575. 23:00>> Transaxle, T4N, uh Ward 8, Michael Betar
  576. 23:04applicants,
  577. 23:05uh 3 F F R E is the owner.
  578. 23:09>> Welcome.
  579. 23:10>> Thank you.
  580. 23:10>> And just quick name for the record?
  581. 23:12>> Mike Betar, surveyor.
  582. 23:14Uh I'm representing the Frescos and 3 F
  583. 23:16F R E LLC.
  584. 23:18Uh we have two homes situated on one lot
  585. 23:22on the corner of German and Ridge. Um
  586. 23:26pictures of the homes here. I know you
  587. 23:27guys have them in the application, but
  588. 23:29obviously we have fronting on German
  589. 23:33and then we have the brick home fronting
  590. 23:34on Ridge. I tried to get some decent
  591. 23:36pictures here to show the spacing and so
  592. 23:38on, but they are in the application. Um
  593. 23:42so we're trying to separate the two
  594. 23:44houses into separate deeded lots. Uh we
  595. 23:47come into a few things that um not only
  596. 23:49the planning department, but the
  597. 23:51building department um is interested in
  598. 23:53including the spacing between the
  599. 23:55structures
  600. 23:56uh being a building department related
  601. 23:58item, the offset to the rear of the
  602. 24:00building being a waiver related
  603. 24:04mathematical item. Uh but we are with in
  604. 24:07terms of our lot coverage, we are um you
  605. 24:09know, we're good to go. We don't we
  606. 24:11don't we're not even close to the lot
  607. 24:14coverage um
  608. 24:15percentages. Um we've designed the new
  609. 24:19line to meet all of the 5-ft spread as
  610. 24:22required by the building department. Uh
  611. 24:25we've created an easement to bring
  612. 24:28utilities into the brick rear structure.
  613. 24:32Uh
  614. 24:32we are seeking the variance aka waiver
  615. 24:36for the rear um
  616. 24:40yard setback and otherwise
  617. 24:44um we are you know, looking to get some
  618. 24:46type of
  619. 24:47uh two separate deeded homes uh each
  620. 24:51having different frontage. Brick home
  621. 24:53fronting on Ridge Street with the front
  622. 24:54facing Ridge Street, German obviously
  623. 24:56facing German Street. Uh so they already
  624. 24:59have a a view of being separated. We're
  625. 25:02just trying to officially separate them.
  626. 25:05Um and that's basically the
  627. 25:09just of the story.
  628. 25:13>> Um just want to talk about the easement
  629. 25:15that is going to be required as well.
  630. 25:17Mike
  631. 25:18>> For the the utility easement, yes. So in
  632. 25:21order for us to get the 5-ft spread,
  633. 25:24uh we have to have an easement for the
  634. 25:26gas to
  635. 25:28um connect to the brick structure. We're
  636. 25:31obviously close in this area here. Um
  637. 25:34and there is a picture of that area um
  638. 25:36well defined in the application uh
  639. 25:39looking down between the structures. Um
  640. 25:44small easement um
  641. 25:47you know uh
  642. 25:48L6 is on here is uh you know they're
  643. 25:51small distances. L4 being 21 ft. So it's
  644. 25:55roughly 20 by 5-ft on one end. So it's
  645. 25:59maybe 100 sq ft.
  646. 26:02125 sq ft max.
  647. 26:12Questions from the board?
  648. 26:15>> Is there a new utility pole or is this
  649. 26:17>> No, that's an under line that's an
  650. 26:19underground gas line that's probably
  651. 26:21from the you know the '80s '70s '80s
  652. 26:24when the gas went in.
  653. 26:27>> No, I was talking about the utility
  654. 26:28pole.
  655. 26:29>> Oh, the utility pole?
  656. 26:30>> Yeah.
  657. 26:31>> Um no, that's been there. That's how
  658. 26:32they've always got electric and that
  659. 26:34actually really doesn't come into play.
  660. 26:36Luckily for us the the overhead
  661. 26:38utilities are already well split. The
  662. 26:40only item that we have is the
  663. 26:43underground gas that requires an
  664. 26:45easement through lot two to attach to
  665. 26:47lot one.
  666. 27:02>> Oops.
  667. 27:04What is the distance?
  668. 27:06>> Relatively straight forward.
  669. 27:09>> Okay.
  670. 27:10And then you need to do the waiver
  671. 27:12setback or the computer setback
  672. 27:16to say you understand it's a tight fit
  673. 27:18with the fire
  674. 27:19your setback is still okay and maybe
  675. 27:22they got blocked in line in the building
  676. 27:24entrance on German Street
  677. 27:28and it's a setback of only 5 ft versus
  678. 27:3110.
  679. 27:32>> Also, one thing to speak on on the
  680. 27:35waiver is in terms of contextual for
  681. 27:39that neighborhood 10 ft would be less
  682. 27:42contextual than what we're asking for
  683. 27:45based upon the fact that the Delaware
  684. 27:46Hudson Canal lots are obviously very
  685. 27:48congested. You know, the houses or some
  686. 27:50of them are
  687. 27:52in this neighborhood there are many
  688. 27:53structures which are party wall lines.
  689. 27:55So there's no setbacks whatsoever. So in
  690. 27:58terms of the overall look and context,
  691. 28:02this fits
  692. 28:03with the overall look of the
  693. 28:05neighborhood. There's nothing out lying
  694. 28:07here that's saying, "Oh my God, there's
  695. 28:08only a short amount." Everything is a
  696. 28:10short amount in that neighborhood
  697. 28:11specifically those few streets in that
  698. 28:13block. You have some tight buildings in
  699. 28:16there.
  700. 28:17That's probably how they got built
  701. 28:19together on one lot in the first place.
  702. 28:23>> So if that one of the houses faces here
  703. 28:27and one of them is
  704. 28:28facing here. Look, the setback line is
  705. 28:31the correct or the setback is similar in
  706. 28:35here and it's
  707. 28:37and then in the middle of it the fire
  708. 28:38department would have Yeah, they would
  709. 28:39have to make
  710. 28:40comply with the safety I'm not a
  711. 28:42problem. That's all.
  712. 28:43>> [clears throat]
  713. 28:44>> So just to give you a better idea of
  714. 28:46also like here, I know you're talking
  715. 28:48about the furniture. So, here's the
  716. 28:49picture of the house fronting on
  717. 28:51Germany. So, we have this white frame
  718. 28:53structure. Here is the house fronting on
  719. 28:55Ridge, the brick structure. And then
  720. 28:57this is the spacing between. So, we have
  721. 29:00a 5-ft spread coming down through here
  722. 29:02to get these two. So, there's still
  723. 29:04walkable area on both sides of the
  724. 29:05boundary line. And that easement that I
  725. 29:07show is right here going in the gas line
  726. 29:10cuz you can see the gas meter on the
  727. 29:11house right there.
  728. 29:13And then this is actually our
  729. 29:14neighboring house right here. So, again,
  730. 29:17the lots are tight in this area.
  731. 29:20Uh but that is neither here nor there.
  732. 29:22>> Would that be anything to do with it
  733. 29:23being a double ending?
  734. 29:24>> No, no. It's just It's a separately
  735. 29:27separated property on the end of the
  736. 29:28block.
  737. 29:30>> Okay.
  738. 29:31>> But it's just a potential thing.
  739. 29:33I mean, they're all in there even using
  740. 29:35the black system.
  741. 29:37But they're not separate.
  742. 29:39>> Mhm.
  743. 29:39>> They're not separate lots either.
  744. 29:42>> All right.
  745. 29:43The applicant has included a waiver
  746. 29:45request that clearly identifies and
  747. 29:47describes the waiver being proposed,
  748. 29:49accompanied by plans and other visual
  749. 29:51representations as applicable.
  750. 29:54>> Yes.
  751. 29:56>> In their letter, the applicant describes
  752. 29:58in detail why the waiver is needed and
  753. 30:00how the waiver request is consistent
  754. 30:02with the intent, design, and
  755. 30:03compatibility of the transect zone in
  756. 30:05which the project is located.
  757. 30:07>> Yes.
  758. 30:08>> Yes.
  759. 30:10>> Will granting the waiver contribute to
  760. 30:12the realization of the overall intent of
  761. 30:14the transect zone and result in an
  762. 30:16improved project which will be an
  763. 30:18attractive and durable contribution to
  764. 30:20the transect zone?
  765. 30:23>> So.
  766. 30:24>> Okay.
  767. 30:28>> To support walkable neighborhoods and or
  768. 30:30mixed-use centers, the project emulates
  769. 30:32the neighborhood context for how far the
  770. 30:34building
  771. 30:35buildings relate to the sidewalk, how
  772. 30:37the facade is designed, and how the
  773. 30:39building interacts with the street.
  774. 30:43>> And I agree.
  775. 30:45This is our assistant.
  776. 30:47Project supports a green and resilient
  777. 30:49future by, for example, reducing
  778. 30:52vehicular miles traveled, providing
  779. 30:54green infrastructure and or street
  780. 30:55trees, and or including high-quality
  781. 30:58usable open space.
  782. 31:03Project supports implementation of
  783. 31:04development patterns that enhance
  784. 31:06density and supports infill development
  785. 31:08or the reuse of existing buildings.
  786. 31:13Project supports the provision of a
  787. 31:15variety of housing types to support a
  788. 31:17range of income levels, age groups, and
  789. 31:19family units.
  790. 31:24Project specifies street design that is
  791. 31:26walkable, bikeable, and will reinforce
  792. 31:29safe and comfort comfortable
  793. 31:31environments for all users.
  794. 31:36Okay, so
  795. 31:38approved.
  796. 31:42>> I will then point out one thing. I don't
  797. 31:44have a policy six on this map. Uh just
  798. 31:47as it's been going back and forth
  799. 31:48between the building and planning
  800. 31:49department. We'll add that as we get it
  801. 31:51more board.
  802. 31:55>> We have those conditions with G. Uh What
  803. 31:57are we supposed to do on this thing?
  804. 32:04>> This looks to be complete.
  805. 32:09>> [clears throat]
  806. 32:13>> We have a motion to accept the short
  807. 32:16environmental assessment form.
  808. 32:18>> Make a motion to accept.
  809. 32:20>> All right, second Spence.
  810. 32:23All in favor?
  811. 32:25Opposed?
  812. 32:41>> And and
  813. 32:43so the motion would be for
  814. 32:46approval of the one or subdivision with
  815. 32:50road policy six including the major
  816. 32:53waiver putting their setback
  817. 32:55submission of five paper and one minor
  818. 32:58copies
  819. 32:59given descriptions for filing including
  820. 33:02the easements with the end of the
  821. 33:04restrictions and all signed by the owner
  822. 33:07before the chairman's signature.
  823. 33:10>> Motion?
  824. 33:13>> Thanks.
  825. 33:13>> Second.
  826. 33:14>> Andrew?
  827. 33:15>> Andrew.
  828. 33:18>> All approved.
  829. 33:20Opposed?
  830. 33:22>> Approved.
  831. 33:22>> Good.
  832. 33:23>> So thank you and Sue, if you want to you
  833. 33:26know in a when you have time in an email
  834. 33:27or whatever um
  835. 33:29lead me to where you want me to go next.
  836. 33:31I know we talked about the building
  837. 33:32department having to approve them of the
  838. 33:35subdivision after the subdivision
  839. 33:36approved. So
  840. 33:38if it's dropping these off or an email
  841. 33:40copy or whatever to get these things
  842. 33:42moving forward, please advise.
  843. 33:45Thank you everybody.
  844. 33:46>> Thank you.
  845. 33:47>> Have a good night.
  846. 33:47>> You too.
  847. 33:52>> Hello Randy.
  848. 33:54So
  849. 33:55>> Hello Randy.
  850. 33:55>> Yep.
  851. 33:56So item five 298 to 300 302 to 318 392
  852. 34:02306 Old Boulevard 262 Boulevard 43 to 75
  853. 34:07Halbert Street extension
  854. 34:09308 to 318
  855. 34:12Old Boulevard 45 to 49 Handy Street lot
  856. 34:16line revision to combine seven lots into
  857. 34:19three
  858. 34:20SBL 56.48-2-7.100
  859. 34:25and 7.200
  860. 34:288 9 10.100
  861. 34:3211 and 12 secret determination.
  862. 34:36Type two Ransack Zone T3 and
  863. 34:41019
  864. 34:43P&D Group LLC is the applicant owner. So
  865. 34:47welcome.
  866. 34:49Call Arias from Banarian Arias. Our firm
  867. 34:52representing the applicant Jeff
  868. 34:55of the P&D Group.
  869. 34:57Our firm did the survey and subdivision
  870. 35:00work.
  871. 35:01>> They're studying it up.
  872. 35:03>> Do I have
  873. 35:04I don't know if [clears throat] I can
  874. 35:05get one of these.
  875. 35:07>> They have them in their notes.
  876. 35:27They do have a copy of anything else
  877. 35:29that you want to do. Sorry, it's just
  878. 35:30taking you
  879. 35:32>> The owner applicant
  880. 35:34owns a total of eight lots here,
  881. 35:37adjacent lots. One of them,
  882. 35:39this one here that fronts 32, will
  883. 35:42remain the same. The other seven lots
  884. 35:45will be essentially consolidated into
  885. 35:48three lots for a total of four total
  886. 35:51lots
  887. 35:53essentially to accommodate
  888. 35:56potential future development
  889. 35:59of these four lots.
  890. 36:01I believe we're seeking two major
  891. 36:03waivers
  892. 36:05for exceeding the maximum lot width and
  893. 36:08lot depth.
  894. 36:10These
  895. 36:11dimensions were already
  896. 36:14exceeding the lot width and depth
  897. 36:17in their current state, but as a result
  898. 36:20of creating new lots under the new
  899. 36:22zoning,
  900. 36:23the waiver is required.
  901. 36:30>> So, they existed
  902. 36:32outside and they spelled out what is
  903. 36:34unique current gains on each lot.
  904. 36:37>> Correct. Well, there's multiple lots to
  905. 36:39what they're doing is kind of
  906. 36:42shifting property line and consolidating
  907. 36:45seven to three, right?
  908. 36:48Um the if you're familiar with the
  909. 36:51location where the electric is located,
  910. 36:56um the business will stay primarily
  911. 36:58they're consolidating those upper lots
  912. 37:01on the top portion.
  913. 37:03>> We'd be deleting lot lines here.
  914. 37:06>> And then
  915. 37:06>> And then
  916. 37:07>> And down below they're shifting that
  917. 37:09over to create two new lots that will be
  918. 37:14primarily, I guess, developed as
  919. 37:16residential new residential housing
  920. 37:18parcels.
  921. 37:24So, the access off of both Albert and
  922. 37:27Condi Street.
  923. 37:33>> So, the the the waiver ask is based on
  924. 37:38>> The
  925. 37:39the current lots do exceed that width
  926. 37:42and depth.
  927. 37:43Um so, it's not really um
  928. 37:45it's it's not like the subdivision
  929. 37:48made these lots much larger.
  930. 37:51>> So, the the plan base code has
  931. 37:54maximum
  932. 37:56depth and maximum widths.
  933. 37:58>> Right.
  934. 37:59>> So, just by shifting a line, we meet two
  935. 38:02of those dimensional
  936. 38:05requirements. So, they do need
  937. 38:07the waivers in order to exceed those
  938. 38:10dimensional requirements on the lower
  939. 38:12portion.
  940. 38:13>> But, it's just written in relation to
  941. 38:15the actual property. It's not because of
  942. 38:17the structure.
  943. 38:17>> Correct. Yeah, there's no structures
  944. 38:20where they are they're to be new
  945. 38:21buildings, new houses.
  946. 38:23>> So, if you had an an existing
  947. 38:27line
  948. 38:28that
  949. 38:30now falls under
  950. 38:32not being compliant under the form-based
  951. 38:34code now,
  952. 38:36what would be the issue in making it
  953. 38:38compliant with the current form-based
  954. 38:40code?
  955. 38:43I feel like I need
  956. 38:45>> multiple small
  957. 38:47>> I think cuz they're combining parcels.
  958. 38:50>> They're adding They're adding properties
  959. 38:53together. They're creating larger two
  960. 38:56larger parcels on the lower section and
  961. 38:59one parcel on the upper section. So, by
  962. 39:02combining all of the properties
  963. 39:04together, the lower the lower parcels
  964. 39:06exceed the dimensions.
  965. 39:09>> They're
  966. 39:09>> Cuz it's 100 ft wide.
  967. 39:11>> It's the It's the sort of nature of the
  968. 39:13the property.
  969. 39:15>> They're getting larger. Yeah.
  970. 39:18They're larger.
  971. 39:19>> Yeah.
  972. 39:21>> And then the depth is 180 ft. This goes
  973. 39:24past those.
  974. 39:25Because of taking multiple small
  975. 39:28combined into
  976. 39:29fewer larger lots.
  977. 39:31>> Okay.
  978. 39:37>> Any questions?
  979. 39:39>> Thanks. Thank you.
  980. 39:41>> But the checklist
  981. 39:43>> Yes, we should have one.
  982. 39:45We have one.
  983. 39:47>> Okay.
  984. 39:50>> They have one.
  985. 39:52>> What Yeah, we created one for both
  986. 39:54because they're both dimensional.
  987. 39:56>> That's right.
  988. 39:57All right.
  989. 39:59Uh the applicant has included a waiver
  990. 40:01request that clearly identifies and
  991. 40:03describes the waiver being proposed,
  992. 40:05accompanied by plans and other visual
  993. 40:07representations as applicable.
  994. 40:09>> Yes. Yeah.
  995. 40:11>> In their letter, the applicant describes
  996. 40:13in detail why the waiver is needed and
  997. 40:15how the waiver request is consistent
  998. 40:17with the intent, design, and
  999. 40:18compatibility of the transect zone in
  1000. 40:20which the project is located. Yes.
  1001. 40:26Granting the waiver
  1002. 40:28Will granting the waiver contribute to
  1003. 40:29the realization of the overall intent of
  1004. 40:31the transect zone and result in improved
  1005. 40:34project, which will be an attractive and
  1006. 40:35durable contribution to the transect
  1007. 40:38zone.
  1008. 40:39Yes.
  1009. 40:42To support walkable neighborhoods and or
  1010. 40:44mixed-use centers, the project emulates
  1011. 40:47the neighborhood context for how far the
  1012. 40:48building buildings relate to the
  1013. 40:51sidewalk, how the facade is designed,
  1014. 40:53and how the building interacts with the
  1015. 40:54street.
  1016. 40:55Yes, it can.
  1017. 40:58Project supports green and resilient
  1018. 40:59future by, for example, reducing vehicle
  1019. 41:02miles traveled, providing green
  1020. 41:04infrastructure and or street trees, and
  1021. 41:06or including high-quality usable open
  1022. 41:08space.
  1023. 41:11Yes,
  1024. 41:12it can.
  1025. 41:13Project supports incremental development
  1026. 41:16in its size and density and supports
  1027. 41:18infill development or the reuse of
  1028. 41:20existing buildings.
  1029. 41:23Yes, it can. Yes.
  1030. 41:26Your choices
  1031. 41:27So, this
  1032. 41:31Use the existing building as one
  1033. 41:32building on the They just rolled right
  1034. 41:34out. Is that Yes. Uh yes.
  1035. 41:38Supports infill development or reuse of
  1036. 41:41existing Yes.
  1037. 41:43Yes, it can.
  1038. 41:45Project supports the provision of a
  1039. 41:47variety of housing types to support a
  1040. 41:49range of income levels, age groups, and
  1041. 41:51family units. Yes,
  1042. 41:54it can.
  1043. 41:55Project specifies street design that is
  1044. 41:57walkable, bikeable, and will reinforce
  1045. 41:59safe and comfortable environments for
  1046. 42:01all users.
  1047. 42:03Yes, it can.
  1048. 42:05Good.
  1049. 42:07So, that's approved. So, now Motion to
  1050. 42:10accept. Mhm. All right. Motion Andrew
  1051. 42:15who would like to second
  1052. 42:20all in favor
  1053. 42:22opposed
  1054. 42:25this passed.
  1055. 42:42Almost there.
  1056. 42:53I think it's five right now.
  1057. 42:59>> Ordinance
  1058. 43:016
  1059. 43:02>> Motion
  1060. 43:03>> And waivers approved
  1061. 43:06will gradually buy paper copies one
  1062. 43:09mylar
  1063. 43:10written scriptures will need to be
  1064. 43:12submitted with the result parcels and
  1065. 43:15the event by the national meeting to be
  1066. 43:17signed by the owner or the chairman and
  1067. 43:20then provided with the Ulster County
  1068. 43:21Planning Board with all the details.
  1069. 43:23>> I have them one mylar.
  1070. 43:24>> Five paper one mylar.
  1071. 43:26>> All right, thank you.
  1072. 43:29>> That's the second motion.
  1073. 43:31>> Okay, so a motion from Kai second Andrew
  1074. 43:37all in favor
  1075. 43:39opposed.
  1076. 43:41Passed.
  1077. 44:08>> I have a question.
  1078. 44:11>> 40 Thomas Street.
  1079. 44:15>> 40 Thomas Street.
  1080. 44:24>> What's that?
  1081. 44:26Up next,
  1082. 44:27item six, 40 Thomas Street, public
  1083. 44:30hearing for administrative special
  1084. 44:32permit renewal to operate an emergency
  1085. 44:35shelter. SBL 56.25-4-44. Secret
  1086. 44:37determination,
  1087. 44:41this one too.
  1088. 44:42>> Type two.
  1089. 44:43>> Type two. Transect zone T5F, ward five,
  1090. 44:47Family of Woodstock, applicant owner.
  1091. 44:51So, any
  1092. 44:52>> This is basically style of a caring
  1093. 44:54neighborhood building.
  1094. 44:56So,
  1095. 44:57no one is
  1096. 44:58>> Anyone have
  1097. 44:59>> Speak.
  1098. 45:02Close the hearing, we're done.
  1099. 45:04>> Hearing is now closed.
  1100. 45:07>> Okay.
  1101. 45:09Good.
  1102. 45:10>> Okay.
  1103. 45:10>> All set.
  1104. 45:11>> All right, item number seven, 25 Fields
  1105. 45:14Court.
  1106. 45:16Site plan and waivers to construct a
  1107. 45:17mixed mixed-use building with commercial
  1108. 45:20on the ground floor and residential
  1109. 45:23above.
  1110. 45:24SBL 56.25-3-25.
  1111. 45:28Secret determination, this one too.
  1112. 45:31Secret determination.
  1113. 45:32>> This this will be a type two.
  1114. 45:35>> Okay.
  1115. 45:35>> But this is a type two.
  1116. 45:36>> This will be a type two secret
  1117. 45:37determination.
  1118. 45:39Transect zone T5F, ward four, Keith
  1119. 45:42Leibold, applicant, City of Easton,
  1120. 45:45owner.
  1121. 45:46So, we'll vote.
  1122. 45:48>> It's public hearing, so is anybody from
  1123. 45:51the public that wants to speak on this?
  1124. 46:02>> Might be a something like that.
  1125. 46:04>> Um
  1126. 46:05>> [laughter]
  1127. 46:06>> Sarah Vasky.
  1128. 46:07>> Okay. We could introductions for the
  1129. 46:10record, please.
  1130. 46:11>> Sure. Good evening, ladies. Michael
  1131. 46:12McGarvey, I'm the project engineer for
  1132. 46:13this application for the board. I have
  1133. 46:15here with me Mr. Keith Wagner from the
  1134. 46:17school development team.
  1135. 46:19>> Okay.
  1136. 46:20>> I
  1137. 46:21see Denise is online. Is she going to
  1138. 46:25>> She has a few town
  1139. 46:26>> She She's
  1140. 46:27>> I'm here and I'm happy to share screen.
  1141. 46:30>> But there's a lot of things
  1142. 46:32>> too. I'm not sure what people whatever
  1143. 46:33one prefers.
  1144. 46:39>> Welcome, folks. Would you like to just
  1145. 46:41walk us through?
  1146. 46:42>> Sure. I brought hard copies. Let's see
  1147. 46:44if I can bring the site plan up on the
  1148. 46:46screen.
  1149. 46:47Standish on Raven Street site plan.
  1150. 47:03>> Can everyone see the screen?
  1151. 47:05>> Yep.
  1152. 47:06>> Yes.
  1153. 47:06>> Great.
  1154. 47:08>> Okay. So, as you noted earlier, the site
  1155. 47:11location is 25 Field Court. It's at the
  1156. 47:13end of Field Court on this side and near
  1157. 47:17the intersection of O'Neal Street and
  1158. 47:18Midtown Linear Park at that location.
  1159. 47:21The existing site actually consists of
  1160. 47:23an abandoned commercial building.
  1161. 47:26The entire site's paved or impervious
  1162. 47:30previous eligibility.
  1163. 47:31We're in the T5 flex zone for this
  1164. 47:35particular project and we're proposing
  1165. 47:3771 units and five stories. It's got an
  1166. 47:40attic and a partial basement. We are
  1167. 47:42seeking waivers
  1168. 47:44as a part of this project 3405
  1169. 47:4716 E3 405 16 at 405 16 J, respectively.
  1170. 47:54We're also proposing
  1171. 47:5635 parking spaces. Standish, you can on
  1172. 47:59the safe line pretty much.
  1173. 48:01Um we're proposing 35 parking spaces
  1174. 48:04and we've designed storm water detention
  1175. 48:06areas in this portion of the lot and
  1176. 48:08under the parking space over here in
  1177. 48:11that portion of the lot. Um so, outside
  1178. 48:14of those waivers that we're requesting,
  1179. 48:15it appears that the project's fully zone
  1180. 48:17compliant I believe.
  1181. 48:19Um
  1182. 48:20We prepared landscaping plan, lighting
  1183. 48:22plan
  1184. 48:23Well, it's already he doesn't go along
  1185. 48:25with it.
  1186. 48:27That's basically the project in a
  1187. 48:29nutshell.
  1188. 48:30Okay.
  1189. 48:31I think our plan was to get feedback
  1190. 48:33from this meeting and then incorporate
  1191. 48:35the comments from the last meeting and
  1192. 48:36this meeting and have those measured
  1193. 48:38fairly quickly. We've
  1194. 48:40addressed most of what percent this
  1195. 48:41already I think all of that or
  1196. 48:44>> So, you got
  1197. 48:44>> Listen to me.
  1198. 48:45>> You've gotten your staff comments back
  1199. 48:47and obviously we just received the this
  1200. 48:50is kind of town board comments.
  1201. 48:53You've seen those.
  1202. 48:55Um
  1203. 48:56they've been posted online as well. So,
  1204. 49:00um have you had a chance to take a look
  1205. 49:02at them and give consideration or any
  1206. 49:05thoughts on I know one of them was
  1207. 49:08pedestrian access egress and Guild Ford
  1208. 49:12and Sue and Neil Street. Another one was
  1209. 49:15to um and I don't know if you got this
  1210. 49:18coming up to you know what you got this
  1211. 49:19as well they came in Friday. But another
  1212. 49:22one was to provide for some additional
  1213. 49:25uh visual um
  1214. 49:28concept
  1215. 49:30drawings to show in the evening and
  1216. 49:33daytime and shadowing um impacts that
  1217. 49:36could potentially lead to the um green
  1218. 49:39line along the
  1219. 49:41halfway there.
  1220. 49:43Have you looked at that?
  1221. 49:44>> What I'm what we kind of said in that
  1222. 49:46was we were confused by that one because
  1223. 49:48we gave
  1224. 49:49you the visuals of all four sides of the
  1225. 49:51building and you can get a visual of
  1226. 49:52some flash
  1227. 49:54through the sunset. It will
  1228. 49:56Yeah, and it will cast a shadow at
  1229. 49:58certain times of the day, and you see
  1230. 50:01it's right up against the
  1231. 50:02>> I think one of the things that the board
  1232. 50:05is going to be interested in seeing are
  1233. 50:09a little bit more of the architectural
  1234. 50:11detail in into the visual simulations as
  1235. 50:16well as the nighttime renderings. Um
  1236. 50:19some of the the renderings that were
  1237. 50:21provided you know, leave a lot of
  1238. 50:23question about window treatments and and
  1239. 50:27materials
  1240. 50:28um
  1241. 50:29and that. So, I think a little bit more
  1242. 50:31detail on those would be um helpful in a
  1243. 50:35final evaluation. Interesting. What it's
  1244. 50:38going to look like from different
  1245. 50:39vantage points, not only from the real
  1246. 50:42line but from the adjoining streetscape,
  1247. 50:45um would be good.
  1248. 50:47>> The work that was provided you know, it
  1249. 50:49doesn't really render the the building
  1250. 50:51details well when you
  1251. 50:53reduce the scale so much. But I tried to
  1252. 50:55blow it up and maybe if I showed you a
  1253. 50:57section
  1254. 50:58of each you kind of get a feel for the
  1255. 51:00architectural
  1256. 51:01>> Yeah, see like the cources, the sills,
  1257. 51:04the lintels, the building material of
  1258. 51:07the facade. That just goes little
  1259. 51:09details.
  1260. 51:10>> No, I understand that we're we're just
  1261. 51:12talking about that today but you know,
  1262. 51:13you can't you just can't see it at that
  1263. 51:15scale. But the first floor is going to
  1264. 51:17be brick and then the upper floors will
  1265. 51:19be various types of concrete siding.
  1266. 51:23>> Then even the coloring if there's
  1267. 51:24variations throughout that and it's
  1268. 51:26two-tone, three-tone, or whatnot.
  1269. 51:28>> Yeah.
  1270. 51:29>> I think a night a nightscape or night
  1271. 51:31scene.
  1272. 51:31>> You want a nightscape as well?
  1273. 51:33We did one There's one rendering of we
  1274. 51:36did it sunset
  1275. 51:39of the main next to the sales office.
  1276. 51:41Hey Stan, do we have that one rendering
  1277. 51:43that shows the building at sunset at the
  1278. 51:45entrance?
  1279. 51:46>> Yeah, we actually have [snorts] we did
  1280. 51:49uh daytime and nighttime views for each
  1281. 51:52view.
  1282. 51:54>> Yeah, I think the problem is that that
  1283. 51:56scale we can't see they can't see the
  1284. 51:58details of them.
  1285. 51:59>> Yeah, so in the lights in that in that
  1286. 52:01rendering there like the the windows
  1287. 52:03just like look
  1288. 52:05black.
  1289. 52:06>> Yeah.
  1290. 52:06>> No, I understand.
  1291. 52:08>> Yeah.
  1292. 52:10>> Yep.
  1293. 52:15Yeah, and the color changes are subtle.
  1294. 52:17It doesn't it doesn't render well on
  1295. 52:19this.
  1296. 52:20Um
  1297. 52:20Can you go up one standish?
  1298. 52:23We didn't do virtual renderings of
  1299. 52:24different color patterns, but there is a
  1300. 52:27few different
  1301. 52:29>> So we also think putting putting the
  1302. 52:32project into the context of
  1303. 52:35the neighborhood and the adjoining
  1304. 52:37buildings rather than
  1305. 52:39having it as a standalone we type of
  1306. 52:42>> Yeah.
  1307. 52:43Okay.
  1308. 52:44>> Visual [snorts]
  1309. 52:45with the helpful.
  1310. 52:52>> Well, did you have Yeah, I wanted to
  1311. 52:54hear that tonight. That's going to be a
  1312. 52:56very specific I mean the same is
  1313. 52:58going to be applied to that.
  1314. 53:00The last thing
  1315. 53:07>> I think the light from the building is
  1316. 53:08actually going to help that part of
  1317. 53:11Broadway because on Broadway is so
  1318. 53:13bright but then just right back back
  1319. 53:15actually I mean it's very dark. So
  1320. 53:21being it from that perspective too is
  1321. 53:23only going to show and demonstrate what
  1322. 53:25kind of difference areas with all that
  1323. 53:27additional light.
  1324. 53:36>> Can you go back to the same one
  1325. 53:37standish?
  1326. 53:38>> Actually that's interesting.
  1327. 53:40>> I think
  1328. 53:41>> I mean I don't know what she said she
  1329. 53:42was like
  1330. 53:49>> Yeah,
  1331. 53:50during construction, what's the plan for
  1332. 53:53staging materials?
  1333. 53:55How do you anticipate that will
  1334. 53:59>> Sure, we're going to utilize the
  1335. 54:01parking area to stage materials, and
  1336. 54:03then once the building's up, we'll then
  1337. 54:06focus on building the parking area out.
  1338. 54:08The construction work will also be
  1339. 54:10mostly parking in the municipal lot.
  1340. 54:13>> You also have this open area back here,
  1341. 54:15which before the structure goes up can
  1342. 54:17store materials as well.
  1343. 54:22>> Security, what do you have planned for
  1344. 54:24that?
  1345. 54:25>> Um we have to fence the site in, and we
  1346. 54:27have to We'll have some cameras up,
  1347. 54:29which are There's five of them.
  1348. 54:33We got mobile cameras set up twice, so
  1349. 54:35we're going to have more cameras.
  1350. 54:37>> Okay.
  1351. 54:37>> But we will have a We're going to do a
  1352. 54:39So the plan unless requested still don't
  1353. 54:42have the plan that shows staging.
  1354. 54:44>> I mean, it's kind of easy on this site
  1355. 54:46because it's already cleared.
  1356. 54:48So you know, we we kind of have a
  1357. 54:51nice surface to lay
  1358. 54:52>> Yeah, but you know, I'm sorry cuz you
  1359. 54:53don't
  1360. 54:54>> just use the parking area to lay down
  1361. 54:57yard for the building, and then as the
  1362. 54:58building goes up,
  1363. 55:00um
  1364. 55:01you'll switch over and do the site work
  1365. 55:02when they finish the inside of the
  1366. 55:04building.
  1367. 55:05>> So with most of your activity going on
  1368. 55:07to build board,
  1369. 55:09with construction, unless presuming most
  1370. 55:13of your materials and and the
  1371. 55:15construction activity will get in and
  1372. 55:16out of build board, how are you thinking
  1373. 55:20of any traffic control
  1374. 55:23at Broadway because that's
  1375. 55:25that's a tough
  1376. 55:27exit out there.
  1377. 55:29>> So for traffic signal.
  1378. 55:30>> Normal traffic. I mean, like you're
  1379. 55:32going to have larger vehicles and
  1380. 55:34construction vehicles going in and out.
  1381. 55:37Do you have any thoughts about that?
  1382. 55:40>> We'll work that out. We plan no more
  1383. 55:42than two deliveries a day. So, I don't I
  1384. 55:45don't think it's going to be a huge
  1385. 55:46impact. You can
  1386. 55:48Once the foundation's in place,
  1387. 55:51the the one-way lane going through
  1388. 55:54O'Neil will be open. So, we'll have
  1389. 55:56during construction that can be that can
  1390. 55:58go in either direction. So, we'll have
  1391. 56:00the ability to come in and out of
  1392. 56:02O'Neil.
  1393. 56:05If you know, if there is
  1394. 56:07if there is an occasional long-body
  1395. 56:09truck that has to get in there, it's
  1396. 56:10probably going to want to come on that
  1397. 56:12O'Neil side. We'll have to shuttle
  1398. 56:14things like
  1399. 56:15>> Okay.
  1400. 56:16>> which trucks would would come in on that
  1401. 56:17side of the building. We'll have
  1402. 56:20>> And then we had talked to you about the
  1403. 56:22parking supply and demand reduction
  1404. 56:25strategy. How are things on that?
  1405. 56:27>> We
  1406. 56:28We did with one way in and out.
  1407. 56:30>> Okay.
  1408. 56:31>> One way in is not existing study still
  1409. 56:33in town.
  1410. 56:33>> Okay.
  1411. 56:35>> That side of the solutions.
  1412. 56:39>> The existing community events that
  1413. 56:41happen on Bill Court, including the
  1414. 56:43pickleball,
  1415. 56:44is that going to need something that's
  1416. 56:45going to have to come to a halt for 2
  1417. 56:47years while this is being developed? So,
  1418. 56:49are we putting those pending those
  1419. 56:51programs
  1420. 56:52>> I don't know. I don't
  1421. 56:54>> I know that the heart of
  1422. 56:55>> It's going to be going on the first time
  1423. 56:56because
  1424. 56:57>> part of the in-town happens on Bill
  1425. 56:59Court.
  1426. 57:00And then also the pickleball's becoming
  1427. 57:02more popular.
  1428. 57:03>> Yeah.
  1429. 57:05Yeah, we did want to talk about I think
  1430. 57:07that third entrance tonight on the rear
  1431. 57:09of the field court. And
  1432. 57:12we were wanting to have that community
  1433. 57:14garden entrance, but a safety entrance
  1434. 57:17for snow removal in the winter if you
  1435. 57:19have to plow snow off the site because
  1436. 57:21there isn't a lot of snow load here.
  1437. 57:23And
  1438. 57:25in in case we get a
  1439. 57:27an accident or something that prevents
  1440. 57:30But then with access onto O'Neil, you
  1441. 57:32had a that would certainly go straight
  1442. 57:33through and out of the site. You want
  1443. 57:36You wanted to give that but stone it.
  1444. 57:39We thought I I thought we had discussed
  1445. 57:41that earlier on as soon as that was
  1446. 57:42something important was
  1447. 57:44open to considering whether or not to
  1448. 57:45have it removed, but
  1449. 57:48um it's a it's important from a
  1450. 57:50pedestrian access standpoint.
  1451. 57:51>> But I think
  1452. 57:52>> Yeah.
  1453. 57:52>> along with otherwise we literally have
  1454. 57:54one-way traffic through the site. So
  1455. 57:56when they only have access there,
  1456. 57:58it's the same as I mean it would be the
  1457. 57:59best if you could put some type of a uh
  1458. 58:02you know, a gate with a bar that raises
  1459. 58:04um so that if we need to have um
  1460. 58:06residents from O'Neal exit the site, and
  1461. 58:08then we would be allowed
  1462. 58:09out of O'Neal and get out the field
  1463. 58:11court as well. And then also, as Keith
  1464. 58:12noted,
  1465. 58:13it assists us in snow removal and so
  1466. 58:20As far as the parking lot statement, um
  1467. 58:23would the board like to see any like a
  1468. 58:27stone wall
  1469. 58:29along the court face or court face along
  1470. 58:30the green sections? So
  1471. 58:33we could do a stone wall that maybe we
  1472. 58:35could build up like a 30-in wall with
  1473. 58:37stone face and make half of it be going
  1474. 58:39to be stable as sitting bench as well as
  1475. 58:42a
  1476. 58:42>> I was saying in in in terms of combining
  1477. 58:45that with the activities that generally
  1478. 58:47take place there where the general
  1479. 58:49public, it might be nice to maybe
  1480. 58:51incorporate a
  1481. 58:52you know, a combination of seating
  1482. 58:54element with your landscaping
  1483. 58:58uh requirement to
  1484. 59:00you know,
  1485. 59:00>> What sort of what would you see along
  1486. 59:03here? Cuz we we were thinking about
  1487. 59:04doing
  1488. 59:06like where these green spaces are
  1489. 59:08uh here, here, and here
  1490. 59:12doing a like a poured concrete wall with
  1491. 59:14stone veneer half and it would be like a
  1492. 59:17sitting bench.
  1493. 59:18>> So it would be it would be great if you
  1494. 59:19>> kind of acts as a a visual break and
  1495. 59:22that it meets the
  1496. 59:24desire of the code,
  1497. 59:26but it's also very functional. People
  1498. 59:27would there that can actually just sit
  1499. 59:29on it, especially for pickleball.
  1500. 59:32>> Yeah.
  1501. 59:34>> You could also have like a a trash
  1502. 59:35receptacle cuz if people are there
  1503. 59:37playing, they'll ultimately have
  1504. 59:39something to throw away. It's not a
  1505. 59:41handy way for you to just have a meeting
  1506. 59:43Skype when you're going to have a
  1507. 59:44meeting.
  1508. 59:45>> And were um some comments
  1509. 59:48>> Do they need to put that waiver?
  1510. 59:51>> Yeah.
  1511. 59:51>> Okay.
  1512. 59:51>> Yeah.
  1513. 59:52>> Yeah. Yeah.
  1514. 59:53>> So, there were some comments received
  1515. 59:55from the CAC
  1516. 59:56>> as well.
  1517. 59:57>> that.
  1518. 59:57>> You saw those as well. So, we're going
  1519. 59:59to need to have them address those
  1520. 1:00:01>> Yeah.
  1521. 1:00:02>> um in your final response for for the
  1522. 1:00:04November meeting.
  1523. 1:00:05>> Okay.
  1524. 1:00:06>> Um I
  1525. 1:00:07>> What one of the other waivers found was
  1526. 1:00:08the
  1527. 1:00:09the setback from the parking from the
  1528. 1:00:10property line?
  1529. 1:00:112 ft versus 5 ft.
  1530. 1:00:13Um that is a waiver we'd be seeking
  1531. 1:00:15because I think it allows us an extra 1
  1532. 1:00:182 3 4 parking spaces.
  1533. 1:00:20>> Mhm.
  1534. 1:00:21>> And there's already a shortage of
  1535. 1:00:22parking in the city on the site. So, um
  1536. 1:00:25it's a it's a small waiver request 2 ft
  1537. 1:00:27to 5 ft plus I think the addition of
  1538. 1:00:30this um landscape wall will provide a
  1539. 1:00:33nice separation between the parking lot
  1540. 1:00:36um and field court, which will add to
  1541. 1:00:38the I think board's consideration of
  1542. 1:00:40that waiver.
  1543. 1:00:42>> Mhm.
  1544. 1:00:45>> We spoke with the landscape architect
  1545. 1:00:47studio.
  1546. 1:00:48We worked with the urban forestry.
  1547. 1:00:51They're they're good on that on that.
  1548. 1:00:53>> Right.
  1549. 1:00:54>> Yes.
  1550. 1:00:54>> We got an understanding of the salt for
  1551. 1:00:56W.
  1552. 1:00:56>> Yes, at least we're dealing with crane.
  1553. 1:00:59>> Yeah.
  1554. 1:00:59>> Um final plan.
  1555. 1:01:00>> Yeah.
  1556. 1:01:01And the third the third waiver I think
  1557. 1:01:03was the elevation difference between the
  1558. 1:01:05first floor I mean
  1559. 1:01:06>> and the grade, yeah.
  1560. 1:01:07>> and the grade.
  1561. 1:01:08>> I accept that.
  1562. 1:01:09>> Okay. So, yeah, yeah, we discussed that,
  1563. 1:01:11but just from an ADA entrance
  1564. 1:01:12compliance, we had to submit a new plan.
  1565. 1:01:21>> So, I guess you do want us to continue
  1566. 1:01:22to proceed with the extra curb cut and
  1567. 1:01:25fill with
  1568. 1:01:29the extra curb cut will remain but will
  1569. 1:01:30have a gate for emergency access
  1570. 1:01:32assessment right.
  1571. 1:01:35How does the board feel about that?
  1572. 1:01:37Well,
  1573. 1:01:38their sales enable you to refer to the
  1574. 1:01:39second curb cut. Yes. Yeah.
  1575. 1:01:42Yes.
  1576. 1:01:45Yeah.
  1577. 1:01:46I think they made it a lot easier just
  1578. 1:01:49and still change access. Yeah.
  1579. 1:01:51I think it's the best of all worlds.
  1580. 1:01:54I agree.
  1581. 1:01:56Okay.
  1582. 1:02:02Does the board have any other questions?
  1583. 1:02:14I sent him an email today reminding him
  1584. 1:02:17that we are looking for names for the
  1585. 1:02:19balance. So hopefully
  1586. 1:02:21I will keep pushing him.
  1587. 1:02:24But yeah. I said about keeping it beyond
  1588. 1:02:27the meeting with the department head
  1589. 1:02:29essentially will get you
  1590. 1:02:30drawings and DPW's approval and
  1591. 1:02:33everything. So you've gotten their
  1592. 1:02:35feedback
  1593. 1:02:36preliminarily
  1594. 1:02:42Board of any other comments?
  1595. 1:02:44What?
  1596. 1:02:47Okay. So you think being
  1597. 1:02:49in about your marching orders? We
  1598. 1:02:51leaving the public hearing open
  1599. 1:02:55sorry. Are we leaving the public hearing
  1600. 1:02:56open?
  1601. 1:03:00But do you mean like to leave the public
  1602. 1:03:01hearing open or do you want to close it?
  1603. 1:03:04I would leave it open
  1604. 1:03:06okay. I would leave it open for now.
  1605. 1:03:08Okay.
  1606. 1:03:12>> [clears throat]
  1607. 1:03:13>> So are you able to end?
  1608. 1:03:17What do you want to say at this point?
  1609. 1:03:27motion
  1610. 1:03:29>> Wait, motion to table this and keep the
  1611. 1:03:31public hearing open until next month.
  1612. 1:03:33Andrew, is motion second? Kyra?
  1613. 1:03:37All in favor?
  1614. 1:03:39Opposed?
  1615. 1:03:41Okay.
  1616. 1:03:43>> Mark is absent.
  1617. 1:03:48>> It is at the time of the excelsior.
  1618. 1:03:51>> Okay.
  1619. 1:03:52All right. Thank you.
  1620. 1:03:54Thank you.
  1621. 1:04:04Maybe I can do that.
  1622. 1:04:06Thank you so much.
  1623. 1:04:07>> And
  1624. 1:04:08let the record show that Sage Nukirk has
  1625. 1:04:11arrived and will be participating.
  1626. 1:04:16>> Go back again.
  1627. 1:04:19Did they win? They won. One to zero.
  1628. 1:04:22I'm not signing this one, right?
  1629. 1:04:24>> Correct.
  1630. 1:04:43>> Number eight.
  1631. 1:04:45>> Number eight.
  1632. 1:04:57Okay, item number eight. 350 Broadway,
  1633. 1:04:59site plan to construct an addition to an
  1634. 1:05:01existing building and establish 10
  1635. 1:05:03residential units.
  1636. 1:05:05SBL 56.26.11-49.100.
  1637. 1:05:10Secret determination soon.
  1638. 1:05:12So, this
  1639. 1:05:13>> This one is, I think, entry.
  1640. 1:05:17>> Try it too.
  1641. 1:05:18Uh transex zone T5, the applicant has
  1642. 1:05:21ward nine. Diane Chen is the applicant.
  1643. 1:05:24350 Broadway Kingston LLC owner.
  1644. 1:05:28Welcome.
  1645. 1:05:29Are you going to just names for the
  1646. 1:05:31record, please?
  1647. 1:05:31>> Good evening. Diane Chen. This is
  1648. 1:05:35This is Mike Shilo, my GC, Odyssey
  1649. 1:05:38Builder. So, I'm going to turn it over
  1650. 1:05:40to him. He knows what to do. Thank you.
  1651. 1:05:42>> [laughter]
  1652. 1:05:43>> Well, if you just want to give us a
  1653. 1:05:44quick walk through. Sure.
  1654. 1:05:46>> will have the screen, so.
  1655. 1:05:48>> You guys are probably familiar with the
  1656. 1:05:50property because it's been on the
  1657. 1:05:51planning board previously with a grant
  1658. 1:05:53on seven units.
  1659. 1:05:55When Diane bought the property, it was
  1660. 1:05:57showing seven units, but it would never
  1661. 1:05:59qualify for
  1662. 1:06:01a building permit because the two
  1663. 1:06:03adjacent lots, even though they're
  1664. 1:06:05lower, didn't allow proper fire egress
  1665. 1:06:08because there was no way they had
  1666. 1:06:09multiple bedrooms.
  1667. 1:06:11During this process, we discovered that
  1668. 1:06:13the second and third floor roofs are in
  1669. 1:06:15total need of replacement, and we talked
  1670. 1:06:18to our local architect, Robert Sweeney,
  1671. 1:06:20and looked at the feasibility of of just
  1672. 1:06:22removing down to the second floor and
  1673. 1:06:24going back up over the existing
  1674. 1:06:26footprint and enclosing the entire
  1675. 1:06:28footprint.
  1676. 1:06:29To make the building code compliant, we
  1677. 1:06:31could only fit studios like we need
  1678. 1:06:33eight one-bedrooms in there that would
  1679. 1:06:34be closed off, and we wouldn't be fire
  1680. 1:06:36code. So, we figured out that we can
  1681. 1:06:38keep the same bedroom count, but we get
  1682. 1:06:4010 units versus the seven that were
  1683. 1:06:42originally planned.
  1684. 1:06:44Mhm.
  1685. 1:06:46Project has three affordable units as
  1686. 1:06:49part of the scope. Um
  1687. 1:06:52we will be looking for a handicap spot
  1688. 1:06:54on the street because when our 10
  1689. 1:06:56originally property was being marketed
  1690. 1:06:59with gated parking in the rear, it
  1691. 1:07:01turned out that the spots weren't gated
  1692. 1:07:03after all of the property, so
  1693. 1:07:05the originally planned handicap parking
  1694. 1:07:07in the back is not feasible anymore. So,
  1695. 1:07:09we either would like to do right in
  1696. 1:07:11front of the property or
  1697. 1:07:13paint and stripe one of the closest
  1698. 1:07:14street in with the city lot if the city
  1699. 1:07:16would be able to do it for the one or
  1700. 1:07:17the other if the city would do it to us.
  1701. 1:07:19In the rear of the property, we are
  1702. 1:07:21going to have access for a full garbage
  1703. 1:07:23container as well as a closed bicycle
  1704. 1:07:26enclosures so that we can fit probably
  1705. 1:07:29one bike for most of the tenants even
  1706. 1:07:31though we're only required to have two,
  1707. 1:07:32we're making it available for
  1708. 1:07:33everybody's use.
  1709. 1:07:35And we're not changing footprint of the
  1710. 1:07:37property at all.
  1711. 1:07:39That's rear of the property. So,
  1712. 1:07:41Broadway facing side will still look the
  1713. 1:07:43same and actually look better cuz it'll
  1714. 1:07:44have windows finally. And probably the
  1715. 1:07:46same thing too.
  1716. 1:07:47I'll answer any questions the board has.
  1717. 1:07:49>> So, you mentioned about the back of the
  1718. 1:07:51property with the
  1719. 1:07:53>> [clears throat]
  1720. 1:07:53>> trash receptacles and all of that. So,
  1721. 1:07:56the last time I was here there was an
  1722. 1:07:58easement [clears throat]
  1723. 1:07:59to access
  1724. 1:08:01>> The easement does not exist. They never
  1725. 1:08:03registered it when the hospital The
  1726. 1:08:04original Since the hospital sold the
  1727. 1:08:06property or the easement, the previous
  1728. 1:08:08owner never got that documented on the
  1729. 1:08:12deed. And unfortunately, it didn't
  1730. 1:08:13transfer to us. It's not mapped there.
  1731. 1:08:16Worst case scenario, if and when the
  1732. 1:08:18hospital decides to do something with
  1733. 1:08:20that lot, we can take the garbage that
  1734. 1:08:22we have there and walk it through our
  1735. 1:08:23ground floor corridor and and put it out
  1736. 1:08:25front where our garbage dumpster comes.
  1737. 1:08:27So, right now we'll have an enclosure
  1738. 1:08:29which can store a 4-yard container which
  1739. 1:08:32the dumpster company can come in and
  1740. 1:08:33open the gates, pull it out, dump it,
  1741. 1:08:36put it back in. And close up the And
  1742. 1:08:39it's not visible. We do have a small
  1743. 1:08:40section in the back which we're going to
  1744. 1:08:42make still keep retain the originally
  1745. 1:08:45planned steps. And there will still be
  1746. 1:08:47an access point on the back of the
  1747. 1:08:49property so that you in essence can walk
  1748. 1:08:51through to the front and that's our main
  1749. 1:08:53ADA compatible.
  1750. 1:08:55>> Okay.
  1751. 1:08:56>> We also plan on marketing the two ground
  1752. 1:08:58floor apartments as ADA. We're required
  1753. 1:09:00to have one but we're making both ADA
  1754. 1:09:02accessible.
  1755. 1:09:04>> Okay.
  1756. 1:09:08Now, this is the change of the facade on
  1757. 1:09:10the front of the building first floor.
  1758. 1:09:13>> This is the existing.
  1759. 1:09:15>> Okay.
  1760. 1:09:15>> It's going to be all We're not changing
  1761. 1:09:17anything on the facade on the front
  1762. 1:09:18floor. There's an existing roofing
  1763. 1:09:19canopy. We're just going to re-roof it
  1764. 1:09:21cuz it's
  1765. 1:09:22>> Okay.
  1766. 1:09:22>> in not in good shape. So, this is the
  1767. 1:09:24rear of the property and it had stucco
  1768. 1:09:27and siding and had a mishmash of
  1769. 1:09:28different things. So, we're going to use
  1770. 1:09:30a Hardie Plank 9-in white standard look.
  1771. 1:09:33The bottom We changed it's masonry on
  1772. 1:09:35this side. The masonry goes up and over
  1773. 1:09:37here it's a wood structure to the top.
  1774. 1:09:39>> But, you you were going to enclose that
  1775. 1:09:42front
  1776. 1:09:42>> Where?
  1777. 1:09:43>> little alcove?
  1778. 1:09:44>> Yes. Oh my god. I Sorry, I totally
  1779. 1:09:46forgot about that. So, right now we have
  1780. 1:09:47a homeless person that likes to use our
  1781. 1:09:49spot. And what we decided to do is bring
  1782. 1:09:52that
  1783. 1:09:53space towards the street more. We'll
  1784. 1:09:55probably leave it within a foot of its
  1785. 1:09:58of the property line. So, that we can
  1786. 1:10:00still keep the We'll call box for the
  1787. 1:10:02fire departments and have their access
  1788. 1:10:04to it, but it would also serve as a wind
  1789. 1:10:06entry for the retail when we rent it
  1790. 1:10:08out.
  1791. 1:10:08>> Amen.
  1792. 1:10:09>> And eliminate the homeless person
  1793. 1:10:10sleeping there.
  1794. 1:10:12>> And then with
  1795. 1:10:13um mailboxes?
  1796. 1:10:14>> Mailboxes, right now we have two
  1797. 1:10:16options. One is right here on the sliver
  1798. 1:10:19just a built-in. We might make the wall
  1799. 1:10:21wider or right now it's programmed you
  1800. 1:10:23walk into the corridor and there'll be
  1801. 1:10:2510 mailboxes plus a commercial for the
  1802. 1:10:27mail departments use in this instance.
  1803. 1:10:30We set inside the wall.
  1804. 1:10:31>> Okay. That would be inside the left
  1805. 1:10:33>> Inside the left door, yes.
  1806. 1:10:34>> Okay.
  1807. 1:10:35>> Secondary door there. So, the mailman
  1808. 1:10:36can get in, but he can't go beyond the
  1809. 1:10:38problem.
  1810. 1:10:38>> Okay.
  1811. 1:10:39>> Um so, you go to your plan to make sure
  1812. 1:10:40there
  1813. 1:10:41>> And the first floor apartments, their
  1814. 1:10:43access
  1815. 1:10:44You go behind?
  1816. 1:10:45>> No, you actually have entrances from the
  1817. 1:10:46front. If you go to the plan
  1818. 1:10:49the section that has
  1819. 1:10:51So, you would walk in here
  1820. 1:10:53>> Okay.
  1821. 1:10:54>> and you have a corridor here to this
  1822. 1:10:55unit and you can go to this one. But,
  1823. 1:10:58they also have access from the rear if
  1824. 1:11:00they want to.
  1825. 1:11:08Because we couldn't bank on having this
  1826. 1:11:10always available for handicap entry, we
  1827. 1:11:13originally were programmed to have a
  1828. 1:11:14lift there. We have to lose access to
  1829. 1:11:16that, we have to maintain this corridor,
  1830. 1:11:18and we have to sacrifice some of this
  1831. 1:11:20space, which originally was part of the
  1832. 1:11:22retail. But, by doing so, we've
  1833. 1:11:24maintained access and also here is the
  1834. 1:11:26>> And it's just one retail?
  1835. 1:11:28>> One retail.
  1836. 1:11:29>> Okay.
  1837. 1:11:30>> Existing.
  1838. 1:11:32750-ish square feet.
  1839. 1:11:42>> Now, another question. Since this takes
  1840. 1:11:45up most of the footprint, and there is
  1841. 1:11:47no easement in the back, how will
  1842. 1:11:49construction stage with materials and
  1843. 1:11:52equipment and
  1844. 1:11:54>> I can bring everything in through here
  1845. 1:11:55or boom it in.
  1846. 1:11:57>> Okay.
  1847. 1:11:57>> We do have
  1848. 1:11:58>> like machines, booms to bring
  1849. 1:12:01>> Well, I did I would have a delivery of
  1850. 1:12:02drywall, that's our biggest item really
  1851. 1:12:04to come in, and and some 2x4s, so we can
  1852. 1:12:06stage it right through the windows.
  1853. 1:12:08Um, I'm led to believe with initial
  1854. 1:12:10conversations that the hospital would
  1855. 1:12:12allow us to take deliveries from the
  1856. 1:12:14back, and wouldn't impact this.
  1857. 1:12:16If we have to go to the front, we'll
  1858. 1:12:17apply for a permit to park,
  1859. 1:12:20load it, and then leave.
  1860. 1:12:21>> Okay.
  1861. 1:12:22>> With flaggers.
  1862. 1:12:31>> Right now, the parking lot, every time I
  1863. 1:12:33go, it's really empty.
  1864. 1:12:35They have been doing work on that there,
  1865. 1:12:36so hopefully
  1866. 1:12:38>> They'll probably stage that area when we
  1867. 1:12:39start.
  1868. 1:12:40>> And then we won't bother anybody too.
  1869. 1:12:42Hopefully they complete it fairly soon.
  1870. 1:12:48What's your timeline?
  1871. 1:12:50>> Assuming this gets going in the right
  1872. 1:12:52direction, we would apply for permits
  1873. 1:12:55next week for the first phase that's
  1874. 1:12:56already permitted, which is the
  1875. 1:12:58downstairs.
  1876. 1:12:59We're finalizing drawings with Charlie
  1877. 1:13:01and hope to have something ready for
  1878. 1:13:03There's an existing building right now
  1879. 1:13:04that we're going to be filing for demo
  1880. 1:13:06and we want to do the roof
  1881. 1:13:08sooner than later. So, if it's not
  1882. 1:13:09raining it's worse.
  1883. 1:13:11>> We're really hoping that's
  1884. 1:13:13late spring this year.
  1885. 1:13:14>> Be on the market soon. Yeah.
  1886. 1:13:18>> But, because I'm in the commercial we
  1887. 1:13:20keep
  1888. 1:13:21interior material business anyway, so
  1889. 1:13:24that becomes very easy. Once I have the
  1890. 1:13:26roof and the windows, inside it will go
  1891. 1:13:29really fast.
  1892. 1:13:30>> Okay.
  1893. 1:13:36>> Any questions?
  1894. 1:13:37>> We're going to go over it now.
  1895. 1:13:41>> And then, I think it's great. I mean,
  1896. 1:13:43that you don't really see a lot of
  1897. 1:13:45proposals for studios and the fact that
  1898. 1:13:48you can get more housing out of it for
  1899. 1:13:50people. Which
  1900. 1:13:51is great.
  1901. 1:13:52>> Lemonade out of lemons. Yeah. Yeah.
  1902. 1:13:54>> That's our architect, Charlie Wesley.
  1903. 1:13:57He's a native Kingston. He said this
  1904. 1:13:59will be so good for the area.
  1905. 1:14:01Great location for a And it will be nice
  1906. 1:14:03to see that
  1907. 1:14:04>> [laughter]
  1908. 1:14:05>> Everybody's looking forward to it.
  1909. 1:14:07>> coming to Is that vacant?
  1910. 1:14:09Finally.
  1911. 1:14:11>> See you then.
  1912. 1:14:11>> Everybody can't wait. Yeah, yeah. Thank
  1913. 1:14:13you.
  1914. 1:14:15>> All right. So,
  1915. 1:14:17>> Thank you so much.
  1916. 1:14:19>> All right. So, this is a type two. We
  1917. 1:14:22have the
  1918. 1:14:22>> And
  1919. 1:14:23is
  1920. 1:14:24Do you
  1921. 1:14:25do require because it's 10 units, you
  1922. 1:14:29are required to have one unit dedicated
  1923. 1:14:32affordable with three
  1924. 1:14:33>> We have three.
  1925. 1:14:35>> You'll have to have one deed restricted
  1926. 1:14:36through a covenant. And then, there will
  1927. 1:14:39be a wreck fee of $10,000.
  1928. 1:14:42And we just recognized potential
  1929. 1:14:45easement in the future and then the
  1930. 1:14:47fourth policies four or ending 6 7 11
  1931. 1:14:5112 16 16A 17 20 21 22 23 and 24.
  1932. 1:14:58Which you will get.
  1933. 1:14:59>> [laughter]
  1934. 1:15:00>> Perfect.
  1935. 1:15:01>> Can you get them?
  1936. 1:15:01>> [clears throat]
  1937. 1:15:02>> How much you said the rent for unit 9
  1938. 1:15:03that's
  1939. 1:15:04>> 11
  1940. 1:15:05>> $9,000 for the rent for unit
  1941. 1:15:06>> 9,000 well
  1942. 1:15:08Yeah, the with 10 units the first six
  1943. 1:15:10are exempt for the and then because they
  1944. 1:15:13are the affordable units for you and six
  1945. 1:15:15units is all
  1946. 1:15:16>> Mhm.
  1947. 1:15:18>> What about taking the other two
  1948. 1:15:19affordable that we're putting into
  1949. 1:15:21consideration?
  1950. 1:15:22>> Mhm.
  1951. 1:15:25>> Take those into account and take those
  1952. 1:15:27are deed restricted, right?
  1953. 1:15:28>> Yes.
  1954. 1:15:28>> Okay.
  1955. 1:15:29>> If they're deed restricted then that one
  1956. 1:15:31>> They are.
  1957. 1:15:32>> If you spread it over they have to be
  1958. 1:15:34deed restricted basically in perpetuity
  1959. 1:15:37for as long as the use remains
  1960. 1:15:40residentially
  1961. 1:15:42occupied.
  1962. 1:15:43>> I think that's your situation.
  1963. 1:15:44>> I can't really adjust it but yeah.
  1964. 1:15:48>> All right, so motion next.
  1965. 1:15:50>> I need a motion.
  1966. 1:15:51>> I'll make a motion.
  1967. 1:15:52>> Can I get a second?
  1968. 1:15:54Sage
  1969. 1:15:56All in favor?
  1970. 1:15:58Opposed?
  1971. 1:16:01Thank you folks. Really appreciate it.
  1972. 1:16:04Look forward to
  1973. 1:16:06receiving the homework.
  1974. 1:16:11Have a great evening.
  1975. 1:16:14>> I'll find the deputy director.
  1976. 1:16:17>> Yeah, we'll we'll send you a my letter.
  1977. 1:16:19>> Do you have any homework
  1978. 1:16:20>> Are you kidding?
  1979. 1:16:21>> I can't even imagine.
  1980. 1:16:22>> What do you
  1981. 1:16:23>> I don't know what that is.
  1982. 1:16:24>> I have a question about
  1983. 1:16:27>> Who says it's a good thing?
  1984. 1:16:28>> I don't know what she what's saying.
  1985. 1:16:30>> So this happened in just one
  1986. 1:16:32>> I was I was waiting to
  1987. 1:16:33>> I don't know what to
  1988. 1:16:34>> I was saying that
  1989. 1:16:34>> I don't know what she was saying to me.
  1990. 1:16:37>> You can do a good job.
  1991. 1:16:40>> Stop it.
  1992. 1:16:42>> I guess that's it.
  1993. 1:16:43>> What did you say?
  1994. 1:17:04>> Okay, item number nine, 11 111 Schwenk
  1995. 1:17:08Drive site plan with associated waivers
  1996. 1:17:11to demolish the existing building and
  1997. 1:17:13construct a mixed-use building with
  1998. 1:17:15ground floor commercial and residential
  1999. 1:17:17above. SBL 48.314-2-
  2000. 1:17:2223.1 secret determination that's two
  2001. 1:17:27transact zone T5 MS ward two Ross
  2002. 1:17:32Hoffman milestone development applicant
  2003. 1:17:35CMRC LLC owner.
  2004. 1:17:39Move forward folks.
  2005. 1:17:53>> [laughter]
  2006. 1:18:28>> Well, welcome folks and if we could just
  2007. 1:18:29have everyone's name for the record.
  2008. 1:18:31>> Yeah, absolutely. Thank you so much for
  2009. 1:18:32having us.
  2010. 1:18:33I'm Marley Bushen. I'm a partner and
  2011. 1:18:35head of development at Milestones.
  2012. 1:18:39Uh this is Martha Bush
  2013. 1:18:41>> I'm a director at Marble. We have a
  2014. 1:18:43construction project.
  2015. 1:18:44>> And now he will also be joining us.
  2016. 1:18:46Scott James.
  2017. 1:18:47>> He's an associate at Marble.
  2018. 1:18:49>> Uh
  2019. 1:18:49we've got Mike Moriello who's doing our
  2020. 1:18:51land use.
  2021. 1:18:53Uh
  2022. 1:18:53Paul Arias who's our civil.
  2023. 1:18:56Kevin O'Connor from Rock Coast, partners
  2024. 1:18:58on the project. Uh and a smattering of
  2025. 1:19:01other people heart and Tim also from
  2026. 1:19:03Rock Coast, my business partner and
  2027. 1:19:05>> And
  2028. 1:19:05>> Um and Samara and Eloise, Mary Daley and
  2029. 1:19:08Eloise Paul from Sycamore Street
  2030. 1:19:09Advisors who are also on the project.
  2031. 1:19:12>> Thanks, Samara. Well, welcome, folks.
  2032. 1:19:15Um
  2033. 1:19:15this point you just want to give us a
  2034. 1:19:18walk through?
  2035. 1:19:18>> Yeah, absolutely. Um so, I think many of
  2036. 1:19:21you know the site as the Kia site.
  2037. 1:19:25>> [laughter]
  2038. 1:19:26>> Uh we'd love for it to be rebranded as
  2039. 1:19:27something else. I have but uh we're
  2040. 1:19:30really excited about this project. We
  2041. 1:19:32are proposing 135 units of all
  2042. 1:19:35affordable housing. Um
  2043. 1:19:38we are working with HCR on the financing
  2044. 1:19:40for this. So, we're doing it as a bond
  2045. 1:19:42and credit deal. So, that will ensure
  2046. 1:19:44that it is 100% affordable. We're
  2047. 1:19:47targeting AMIs between 40%
  2048. 1:19:51Um and we are hoping to close on this
  2049. 1:19:55about a year from now on financing. Um
  2050. 1:19:59assuming that approvals and everything
  2051. 1:20:00go well, okay. Uh we are including
  2052. 1:20:04studios to three-bedroom units.
  2053. 1:20:06Um
  2054. 1:20:07and uh as you can see, the building is
  2055. 1:20:11sort of L-shaped and it's got a small
  2056. 1:20:13amount of ground floor retail to comply
  2057. 1:20:15with the zoning on the C5 Main Street.
  2058. 1:20:17Um and we're also currently proposing
  2059. 1:20:20doing the project uh as mass timber uh
  2060. 1:20:23as sort of a sustainable building
  2061. 1:20:25method. We have uh geothermal heating
  2062. 1:20:28and cooling uh that we're designing into
  2063. 1:20:30the project. and um
  2064. 1:20:33yeah, we uh
  2065. 1:20:34have
  2066. 1:20:35over 100 spaces of surface parking
  2067. 1:20:38beside this by far it is about 2 acres,
  2068. 1:20:40so we're able to accommodate that and we
  2069. 1:20:42think that that will be more than enough
  2070. 1:20:44for the uh population in the building.
  2071. 1:20:47Um and I will turn it over to the
  2072. 1:20:50architects who will take us through more
  2073. 1:20:52of the specifics. Yeah.
  2074. 1:20:53>> If there's any questions about 519, I'll
  2075. 1:20:55be able to explain them.
  2076. 1:20:58Um I think we're just getting them
  2077. 1:21:00Yeah, the graphics up.
  2078. 1:21:10full screen.
  2079. 1:21:16We got
  2080. 1:21:17We got the server
  2081. 1:21:18How do you like those yet?
  2082. 1:21:25And then change
  2083. 1:21:33Well, this is the aspect of speaking.
  2084. 1:21:36All of this is
  2085. 1:21:37still
  2086. 1:21:54So, what we're doing is this is the um
  2087. 1:21:57all of that on the site plan, but
  2088. 1:21:59there's going to be a small lot line
  2089. 1:22:02revision associated with this because
  2090. 1:22:05there's a piece in the rear that they're
  2091. 1:22:07going to need
  2092. 1:22:08um
  2093. 1:22:09assuming ownership of the adjoining
  2094. 1:22:12property to the land.
  2095. 1:22:14>> I'm going to guess they're off the rear.
  2096. 1:22:16>> Back here on the site, there's that odd
  2097. 1:22:19sort of triangle uh that cuts in versus
  2098. 1:22:21to the 111 straight site, and so we um
  2099. 1:22:26have an agreement with um
  2100. 1:22:28um Bob Ryan
  2101. 1:22:30uh, who owns the property and I started
  2102. 1:22:32to acquire that site in conjunction with
  2103. 1:22:34our closing. And you can actually see
  2104. 1:22:36the triangle sort of highlighted on the
  2105. 1:22:37bubble. You have a small computer.
  2106. 1:22:40>> So, uh, project highlights which Marley
  2107. 1:22:43just ran through. This mentions 100%
  2108. 1:22:46portable 150 by units,
  2109. 1:22:48hybrid CLT construction cross-laminated
  2110. 1:22:50timber, uh, geothermal heating and
  2111. 1:22:53cooling.
  2112. 1:22:54Um, also some interesting stuff at the
  2113. 1:22:56site. We're actually flood wings. We're
  2114. 1:22:57doing flood resiliency to buildings.
  2115. 1:22:59It's actually 5 ft above the ground
  2116. 1:23:02plane. So, we're going with that.
  2117. 1:23:04Um, and we're providing approximately
  2118. 1:23:06102 parking spaces. So,
  2119. 1:23:09real quickly, I'll go over some context
  2120. 1:23:11and design and then get into the
  2121. 1:23:12building. So, this is where Branch
  2122. 1:23:14Schwenk is uh, located. So, this is the
  2123. 1:23:16site with that lot line adjustment
  2124. 1:23:18shown. So, we're just outside of the
  2125. 1:23:20historic district here on the other side
  2126. 1:23:22of the hill.
  2127. 1:23:23Um, and here there's the single, uh,
  2128. 1:23:26old, uh, car lot there with
  2129. 1:23:29asphalt around it. So, when we got into
  2130. 1:23:32the design, we were really taken,
  2131. 1:23:34obviously, with the Stockade District
  2132. 1:23:35and with Front Street and Wall Street
  2133. 1:23:37and kind of looking at the qualities of
  2134. 1:23:39the buildings there
  2135. 1:23:41um, and contrasting that with Schwenk
  2136. 1:23:43Drive. So, we went through and we did a
  2137. 1:23:44whole inclusive looking at the rhythms
  2138. 1:23:46and the proportions of those facades and
  2139. 1:23:48trying to understand what makes those
  2140. 1:23:50buildings have so much character.
  2141. 1:23:52And then we looked at Schwenk Drive
  2142. 1:23:54which has
  2143. 1:23:55a quite different typology of suburban
  2144. 1:23:57buildings and a parking lot, right? So,
  2145. 1:23:58kind of the big question for us is how
  2146. 1:24:00we bring that character down there on
  2147. 1:24:03the river here.
  2148. 1:24:04Um, and so, this is some photos of the
  2149. 1:24:06site if you don't know it that well. Uh,
  2150. 1:24:08so, this is the building on the
  2151. 1:24:10backside. Here you have all these
  2152. 1:24:12building these trees that are going up
  2153. 1:24:13the hill kind of screen the parking lot
  2154. 1:24:15a little bit. And there's existing
  2155. 1:24:17foliage on either side of the building
  2156. 1:24:19as well.
  2157. 1:24:20Um,
  2158. 1:24:21so, we're really taken with the textures
  2159. 1:24:23of the town, right? All the different
  2160. 1:24:24history and all the details that make up
  2161. 1:24:27the buildings and particularly the
  2162. 1:24:29adjacent Stockade Historic Area. And we
  2163. 1:24:31did a whole analysis looking at the
  2164. 1:24:33wealth and material history that comes
  2165. 1:24:34from Kingston and the greater Ulster
  2166. 1:24:36County. So, we looked at brick, we
  2167. 1:24:38looked at timber, we looked at bluestone
  2168. 1:24:41and limestone masonry, we looked at
  2169. 1:24:42cement.
  2170. 1:24:44And then we, you know, went back to the
  2171. 1:24:45site
  2172. 1:24:47and we looked at actually the building
  2173. 1:24:48history of the Stockade District and
  2174. 1:24:51what the buildings were made out of,
  2175. 1:24:53largely brick frame siding and concrete
  2176. 1:24:55and how that changed over time.
  2177. 1:24:57So, then when we went to the site, we
  2178. 1:24:59took two what we call bars
  2179. 1:25:02and we treated one with brick and
  2180. 1:25:03another with a limestone or stone like
  2181. 1:25:05material using a high-density panel
  2182. 1:25:08which has a texture to it, it's like a
  2183. 1:25:10furred material.
  2184. 1:25:12So, we defined those volumes, we
  2185. 1:25:14articulated the volumes a little bit
  2186. 1:25:15differently. The brick one has this
  2187. 1:25:17stepping on the front to follow the
  2188. 1:25:18curve of the street corner. As that's
  2189. 1:25:20what we always said, but don't show me
  2190. 1:25:22the whole thing. We connected them with
  2191. 1:25:24this bridge across. And then finally we
  2192. 1:25:27articulated the volumes by adding some
  2193. 1:25:29more wood into the the building and
  2194. 1:25:32those kind of that happen at public
  2195. 1:25:33spaces within the building and then we
  2196. 1:25:36lifted the back portion of the building
  2197. 1:25:38up so that we get all the parking
  2198. 1:25:40underneath it in the front.
  2199. 1:25:42So, that gives us two facade systems for
  2200. 1:25:45the building. They're both
  2201. 1:25:47a rain screen insulation system, but on
  2202. 1:25:49the front it's a a brick facade, it's a
  2203. 1:25:52Kingston brick so it's a bit longer and
  2204. 1:25:54taller.
  2205. 1:25:56And then on the back is that
  2206. 1:25:58high-density panel that we talked about.
  2207. 1:26:00So, the brick will have headers and
  2208. 1:26:02sills
  2209. 1:26:04and then the
  2210. 1:26:06panel portion will have some trim around
  2211. 1:26:09the windows to help cast shadows and
  2212. 1:26:10break up the facade as well.
  2213. 1:26:13So, we mentioned that it was hybrid CLT.
  2214. 1:26:16What that means is that the floors and
  2215. 1:26:18then out of cross-laminated timber.
  2216. 1:26:20Um so, because of the flood plane here,
  2217. 1:26:23we're building that first floor out of
  2218. 1:26:24concrete. So, it's resilient. So, it's a
  2219. 1:26:26concrete podium.
  2220. 1:26:28Um so, above that, but you have See
  2221. 1:26:30these orange lines here? That will be
  2222. 1:26:33cross-laminated timber flooring, which
  2223. 1:26:34will be exposed in the apartment. So,
  2224. 1:26:36this is a similar style project, but you
  2225. 1:26:38can see the wood ceilings there. And
  2226. 1:26:41then the walls themselves will be
  2227. 1:26:43uh light wood framing. So, those are
  2228. 1:26:46spaced on a 12 by 6 module,
  2229. 1:26:48um which act as bearing and shear walls
  2230. 1:26:50throughout.
  2231. 1:26:51Uh and then also above the first floor,
  2232. 1:26:54that CLT is going to be making up the
  2233. 1:26:57elevator shafts and the stair shafts.
  2234. 1:26:59So, when you're in a corridor, you can
  2235. 1:27:00see where the public spaces are, and
  2236. 1:27:02they can move by seeing the wood.
  2237. 1:27:06Uh so, this is a view from the
  2238. 1:27:07northwest, um which was on one of the
  2239. 1:27:09earlier slides. This is the retail
  2240. 1:27:11component uh that Marylin mentioned.
  2241. 1:27:14This is the kind of burning the sloping
  2242. 1:27:16that we're using to navigate that 5-ft
  2243. 1:27:19difference. So, we're using the
  2244. 1:27:20landscape and we use it as notches, like
  2245. 1:27:22a harsh wall in front of the building's
  2246. 1:27:24wall. Well,
  2247. 1:27:25this is a view from the southwest. If
  2248. 1:27:27you go in the parking lot, so if you
  2249. 1:27:29look at it
  2250. 1:27:31that way. And then this is the screening
  2251. 1:27:33and the rear entrance into that amenity
  2252. 1:27:35courtyard
  2253. 1:27:37um that was mentioned, and you can start
  2254. 1:27:38to see some of the amenity rooftop
  2255. 1:27:40terraces above.
  2256. 1:27:43And then looking at the northeast, you
  2257. 1:27:44can see the drive aisle. So, that takes
  2258. 1:27:46you back into the parking. There's 102
  2259. 1:27:47spaces. And then here you get a kind of
  2260. 1:27:49clear view of the residential entrance.
  2261. 1:27:51So, again, anywhere where there's kind
  2262. 1:27:53of public movement, that's where we
  2263. 1:27:55start to bring in the wood and bring it
  2264. 1:27:56in from the outside.
  2265. 1:27:58Um and then here you see the stepping of
  2266. 1:27:59the building itself. It's stepping 2 and
  2267. 1:28:011/2 in 2 and 1/2 foot increments. And
  2268. 1:28:04so, that brings down the natural canopy,
  2269. 1:28:06so that we don't need to add anything
  2270. 1:28:08else on to the facade.
  2271. 1:28:11And then this is a view from the
  2272. 1:28:13courtyard. That initial early sketch we
  2273. 1:28:15did, but gives you an idea of the
  2274. 1:28:17amenity spaces that will be wrapping
  2275. 1:28:19this courtyard. So you'll have your
  2276. 1:28:20lounge off of it. Uh you'll have your
  2277. 1:28:22laundry and your gym. Um and then you
  2278. 1:28:25can kind of see some of the CLT coming
  2279. 1:28:27through the windows up there.
  2280. 1:28:30Uh this is a ground floor plan zoomed in
  2281. 1:28:33on the first floor of the building
  2282. 1:28:35itself. So this is the courtyard
  2283. 1:28:37that we were just looking at. You have
  2284. 1:28:38your amenity spaces wrapping it with
  2285. 1:28:40this corridor so that there's always
  2286. 1:28:41natural light coming into that. Um and
  2287. 1:28:44then you have your main entrance here in
  2288. 1:28:46the north, which is what we looked at
  2289. 1:28:47with the ramp, the stairs, the retail,
  2290. 1:28:49and the residential entrance are on the
  2291. 1:28:51same level. So they're both at that 5-ft
  2292. 1:28:54uh elevation. And then there is a rear
  2293. 1:28:56entrance from the parking area that has
  2294. 1:28:59both a ramp and stairs as well.
  2295. 1:29:02Um on the ground floor we also have like
  2296. 1:29:04our water meter, electrical service room
  2297. 1:29:06up here in the corner. We have a
  2298. 1:29:08compactor room um which will carry 30
  2299. 1:29:11toters, which will be brought out and
  2300. 1:29:12staged in the back. Uh we're working
  2301. 1:29:15with our waste management on that.
  2302. 1:29:18And then the typical floor, these will
  2303. 1:29:20run through two through six. Um so these
  2304. 1:29:22have the studios, the one beds, the two
  2305. 1:29:24beds, and the three beds.
  2306. 1:29:26Uh this repeats per the floor or per
  2307. 1:29:29every floor. So there's an elevator bank
  2308. 1:29:30here in the north. You have your stair
  2309. 1:29:32here in the north and another stair in
  2310. 1:29:33the south. So those run
  2311. 1:29:36back
  2312. 1:29:38down.
  2313. 1:29:39So that stair A goes out and exits
  2314. 1:29:41through there and stair B connects it
  2315. 1:29:42out here. And stair B actually exits out
  2316. 1:29:45above the flood plane,
  2317. 1:29:48um which is just kind of a
  2318. 1:29:50you know, in case there is a flood, that
  2319. 1:29:52way you're not opening the flood right
  2320. 1:29:54out of the water.
  2321. 1:29:57And then on the roof we have an amenity
  2322. 1:29:59terrace in the bar portion in the center
  2323. 1:30:01there.
  2324. 1:30:02Uh and then we have the stairs on either
  2325. 1:30:04side.
  2326. 1:30:05Because we're using a geothermal system,
  2327. 1:30:08we don't actually have that much
  2328. 1:30:09equipment on the roof. So, we have two
  2329. 1:30:11ERVs in the north and two ERVs in the
  2330. 1:30:13south. And then there's a a generator
  2331. 1:30:16that will be on the north on the strong
  2332. 1:30:18rise.
  2333. 1:30:21So, as part of this, we are going for
  2334. 1:30:24seven
  2335. 1:30:25waivers. Three of them are major and
  2336. 1:30:28four minor. The first one
  2337. 1:30:32is the built-to zone. So, as of right
  2338. 1:30:35with the affordability bonus, we can
  2339. 1:30:37build up to six stories. Uh for the
  2340. 1:30:39first 80 ft. So, that's essentially
  2341. 1:30:41roughly this far in the broad up to six
  2342. 1:30:45stories.
  2343. 1:30:46Uh what we're looking to do is to
  2344. 1:30:48continue that across so that we get more
  2345. 1:30:51affordable units here in the back seven.
  2346. 1:30:53Um the second major waiver is a distance
  2347. 1:30:57between glazing. So, per zoning, I'll
  2348. 1:31:00jump back to that beautiful
  2349. 1:31:03Per zoning, this portion of the facade
  2350. 1:31:05needs to be 2 ft wide. Uh we're showing
  2351. 1:31:08it as four to keep a proportional rhythm
  2352. 1:31:10with the rest of the building.
  2353. 1:31:11Um and also to account for the
  2354. 1:31:13structural column that's coming down
  2355. 1:31:14there.
  2356. 1:31:18The
  2357. 1:31:19third major waiver is
  2358. 1:31:21curb cut width. Uh per the zoning, the
  2359. 1:31:23maximum curb cut is 20 ft wide. We are
  2360. 1:31:26showing currently a 24 ft curb cut
  2361. 1:31:28width, but then the arrows are 20 ft and
  2362. 1:31:30the drive aisle after it will be on the
  2363. 1:31:32street.
  2364. 1:31:33Uh the four minor waivers are for the
  2365. 1:31:35front built-to zone. So, first one is
  2366. 1:31:38per the zoning, the building needs to be
  2367. 1:31:41within 5 ft of the perimeter of the
  2368. 1:31:43property line. But, because of the flood
  2369. 1:31:47uh resiliency, we the space to get up
  2370. 1:31:50into the building. So,
  2371. 1:31:52we're trying to set that back.
  2372. 1:31:53Uh the building width uh the the zoning
  2373. 1:31:56permits 150 ft. So, we're less than 10%
  2374. 1:31:59over, but we're a little bit wider this
  2375. 1:32:01far of 162 ft.
  2376. 1:32:03Um and then there is a blank wall on the
  2377. 1:32:07ground floor.
  2378. 1:32:10Here, so in order to get this drive out
  2379. 1:32:12here so that the cars can come through,
  2380. 1:32:14that means that we need to put the
  2381. 1:32:16front-facing utility entry here.
  2382. 1:32:20Um instead of being able to like break
  2383. 1:32:21it up or put something in between. Uh so
  2384. 1:32:24that creates uh
  2385. 1:32:26a blank wall that's a little bit larger,
  2386. 1:32:27but we're articulating that with
  2387. 1:32:29different materials and potentially
  2388. 1:32:30putting signage there.
  2389. 1:32:32>> Can you show that blank wall on the
  2390. 1:32:33front right here?
  2391. 1:32:34>> The um
  2392. 1:32:35yeah, it's
  2393. 1:32:38here.
  2394. 1:32:39>> Okay.
  2395. 1:32:39>> So our thought is like we can add
  2396. 1:32:41signage here adjacent to it and then use
  2397. 1:32:43the landscaping to soften that. Um so
  2398. 1:32:46that way it's not just a big a stretch.
  2399. 1:32:52And then the fourth waiver is related to
  2400. 1:32:54signage. Uh per the zoning
  2401. 1:32:57the letter of it says that the wall
  2402. 1:32:59signage needs to be uh
  2403. 1:33:01above the storefront. We're showing it
  2404. 1:33:03as adjacent uh in our drawings, which I
  2405. 1:33:06can pull those up, but
  2406. 1:33:08um that's largely because here the
  2407. 1:33:09storefront runs all the way to the top,
  2408. 1:33:11so we have the signage here to help
  2409. 1:33:14break up that
  2410. 1:33:16uh blank wall facade. Um whereas it'll
  2411. 1:33:19be above the
  2412. 1:33:21the storefront for the retail.
  2413. 1:33:24And then this is the overall site plan.
  2414. 1:33:27So this is 102 parking spaces.
  2415. 1:33:30The EV spaces here to the south, the
  2416. 1:33:32bike parking will be
  2417. 1:33:34uh under the overhang of the building
  2418. 1:33:36adjacent to the back entry. Um and then
  2419. 1:33:40we have our ADA spaces here as well.
  2420. 1:33:42Uh Paul, was there anything else with
  2421. 1:33:44the
  2422. 1:33:45>> Um I'll just say quickly uh
  2423. 1:33:49we're to
  2424. 1:33:50redeveloping a largely impervious site
  2425. 1:33:53and and actually reducing by 8% the
  2426. 1:33:56impervious area.
  2427. 1:33:58Um [snorts] I have verified in
  2428. 1:34:00communication with the city engineer the
  2429. 1:34:02base flood elevation we're using 155.4.
  2430. 1:34:06So, the finished floors are all 2 ft
  2431. 1:34:08above that.
  2432. 1:34:10Um and happy to answer any questions
  2433. 1:34:14regarding our our civil site plan or
  2434. 1:34:16engineering related issues.
  2435. 1:34:19>> Can you just speak to just a little bit
  2436. 1:34:21about how right now there is storm water
  2437. 1:34:24that and it runs through the site, it
  2438. 1:34:26connects other properties as well, and
  2439. 1:34:29how that's going to all be redirected
  2440. 1:34:32and on an interim when the construction
  2441. 1:34:35is not being on this site, how the storm
  2442. 1:34:39water is going to be addressed from the
  2443. 1:34:40adjacent sites and that doesn't back up
  2444. 1:34:43there?
  2445. 1:34:43>> Sure. Um so, we have I believe four
  2446. 1:34:47connections. There's a small catch basin
  2447. 1:34:50from Bob Ryan's property that goes into
  2448. 1:34:53a basin on our site. We have a small
  2449. 1:34:56basin from the teachers union
  2450. 1:35:00on the adjacent site who have an
  2451. 1:35:02easement here and a small 6-in line that
  2452. 1:35:05comes onto our site and then there's uh
  2453. 1:35:08one other line from the federal credit
  2454. 1:35:11union that actually won't be affected.
  2455. 1:35:14We'll be rerouting the storm up
  2456. 1:35:16Let me show it better on a different
  2457. 1:35:18plan. Um so, it's really just these two
  2458. 1:35:20basins which are essentially overflows
  2459. 1:35:24from a drywell system on this property
  2460. 1:35:26adjacent.
  2461. 1:35:28Um
  2462. 1:35:29not really concerned about
  2463. 1:35:32during construction. What they would go
  2464. 1:35:35from downstream and back, so these would
  2465. 1:35:39by the time these are tied back in,
  2466. 1:35:42they they would be connected to the Frog
  2467. 1:35:44Alley system that discharges
  2468. 1:35:47that way.
  2469. 1:35:48Um
  2470. 1:35:49if we have to do any temporary bypass
  2471. 1:35:53uh
  2472. 1:35:53if there's a storm, then they're not
  2473. 1:35:55connected in the couple days while we're
  2474. 1:35:58reconnecting these
  2475. 1:36:00these 6-in lines, uh we'll we'll do that
  2476. 1:36:03as needed.
  2477. 1:36:05>> And you're proposing a new um
  2478. 1:36:09What's the name of it?
  2479. 1:36:10>> The hydro-dynamic separator.
  2480. 1:36:12>> Thank you.
  2481. 1:36:13>> That'll That'll help us meet our water
  2482. 1:36:15quality goal and treatment for the slip
  2483. 1:36:18redevelopment slip. Um allows for the
  2484. 1:36:21use of those, and that's
  2485. 1:36:23that'll be here right before going out
  2486. 1:36:26the Frog Alley.
  2487. 1:36:27Um and that will be able to convey the
  2488. 1:36:30100-year storm flow while while treating
  2489. 1:36:33the storm water.
  2490. 1:36:34>> I don't know the board is familiar with
  2491. 1:36:37that. Can you just kind of describe the
  2492. 1:36:38system because I don't think it's
  2493. 1:36:40something that we're
  2494. 1:36:40>> Sure. It's more of a mechanized uh
  2495. 1:36:43system
  2496. 1:36:45um
  2497. 1:36:46that has like a swirl
  2498. 1:36:48um
  2499. 1:36:49I I call it a filter filtration system
  2500. 1:36:52that that treats storm water and and
  2501. 1:36:54discharges it a cleaner uh storm water
  2502. 1:36:57we used one at Benedictine and
  2503. 1:37:01we've used them all over for
  2504. 1:37:02redevelopment projects. It's I think a
  2505. 1:37:056-ft diameter. Looks like a looks like a
  2506. 1:37:08dry well, but it has a
  2507. 1:37:11it it's mechanized and and provides our
  2508. 1:37:14treatment.
  2509. 1:37:15>> Does that need to be serviced or
  2510. 1:37:17emptied?
  2511. 1:37:18>> There's There's some maintenance
  2512. 1:37:20requirements um
  2513. 1:37:22I'm sure every 5 to 10 years.
  2514. 1:37:24I I would have to check the exact.
  2515. 1:37:28>> The The building is anticipating having
  2516. 1:37:29a building superintendent.
  2517. 1:37:31>> Okay.
  2518. 1:37:31>> So maintenance should be easily covered.
  2519. 1:37:40>> Yep. So if there's any questions for our
  2520. 1:37:41group, thank you.
  2521. 1:37:47>> So
  2522. 1:37:48just for the record numbers, we've
  2523. 1:37:50obviously you've got staff notes and we
  2524. 1:37:52did send the staff notes out to you all.
  2525. 1:37:56I'm sure some of you will look at them
  2526. 1:37:58and digest them
  2527. 1:38:00and
  2528. 1:38:01we'll be making
  2529. 1:38:03comments back on them. If you have any
  2530. 1:38:05questions for us about anything that is
  2531. 1:38:09within those, let us know
  2532. 1:38:11before next month.
  2533. 1:38:14This does need to go to the county, so I
  2534. 1:38:17do want to forward to
  2535. 1:38:19if they're comfortable with the level of
  2536. 1:38:21information. I think it's developed we
  2537. 1:38:23think it's developed enough to send that
  2538. 1:38:26referral to the county planning board
  2539. 1:38:29so that we can do that next month. I
  2540. 1:38:31think also we would ask the board at
  2541. 1:38:33public hearing.
  2542. 1:38:35There's obviously one required by law
  2543. 1:38:37for the lot line revision that is part
  2544. 1:38:40of the project. I think a site plan
  2545. 1:38:43public hearing is also in order
  2546. 1:38:45on this.
  2547. 1:38:47The other thing I'm just as we talked
  2548. 1:38:49about with the 25 foot court one, I
  2549. 1:38:51think that there should be some um
  2550. 1:38:54uh more visual simulations done. Um I'd
  2551. 1:38:58like the board to think about and
  2552. 1:39:00maybe tonight come up with a couple of
  2553. 1:39:03locations that, you know, as you're
  2554. 1:39:06coming down Schwank or going up, you
  2555. 1:39:08know, either direction on Schwank I
  2556. 1:39:10think it'd be really appropriate to
  2557. 1:39:12have some
  2558. 1:39:14visual simulations for day and night um
  2559. 1:39:17with building context of existing
  2560. 1:39:20buildings in place.
  2561. 1:39:22Um
  2562. 1:39:23and also maybe from up above to get any
  2563. 1:39:26sense of
  2564. 1:39:28from the historic district. So, I don't
  2565. 1:39:31know what are the board's thoughts on
  2566. 1:39:33that.
  2567. 1:39:37>> And this is a
  2568. 1:39:39six-story building primarily is a
  2569. 1:39:42one-story area.
  2570. 1:39:44>> So, especially with the front street
  2571. 1:39:45just to see what it'll do to the view.
  2572. 1:39:48That would be one location.
  2573. 1:39:50Not that it's saying.
  2574. 1:39:58>> So, the that parking lot on on North
  2575. 1:40:01Front Street is
  2576. 1:40:03right. This is the guardrail.
  2577. 1:40:05>> Yeah, yeah.
  2578. 1:40:07>> From Front Street, it's due to the
  2579. 1:40:09mature trees that are sort of on that
  2580. 1:40:11slope up to the parking lot. They
  2581. 1:40:13actually provide quite a bit of
  2582. 1:40:15screening from Front Street.
  2583. 1:40:18Um but that's sort of the perspective
  2584. 1:40:20there.
  2585. 1:40:20>> Yeah, this is a the normal perspective.
  2586. 1:40:23>> Do we know the grade change between the
  2587. 1:40:25our parking lot and
  2588. 1:40:27the parking lot of North Street?
  2589. 1:40:29>> Yeah.
  2590. 1:40:36We go from 180 to about what what do we
  2591. 1:40:39have? 150 or 160? Or 155? Yeah.
  2592. 1:40:4425 ft.
  2593. 1:40:49>> I just I think it's important
  2594. 1:40:51to have those simulations particularly
  2595. 1:40:54because one of the waiver requests is
  2596. 1:40:58to have both the fifth and the sixth
  2597. 1:41:00floor extended
  2598. 1:41:02back
  2599. 1:41:04all the way to the rear of the building,
  2600. 1:41:06which is
  2601. 1:41:08quite a large deviation
  2602. 1:41:11waiver request. I wasn't It's close to
  2603. 1:41:14200% and so I think it's important to
  2604. 1:41:17understand
  2605. 1:41:19visually and different
  2606. 1:41:25view viewpoints.
  2607. 1:41:30>> Sure, and we can also show it in the
  2608. 1:41:31context of the Kingstonian, which will
  2609. 1:41:34also be like a virtual drive by there.
  2610. 1:41:38And the
  2611. 1:41:41I mentioned it like the reason to bring
  2612. 1:41:43that waiver or why we're requesting that
  2613. 1:41:45is we get about
  2614. 1:41:4730
  2615. 1:41:49additional units of affordable housing.
  2616. 1:41:51And so it it has a lot of implications
  2617. 1:41:55if we were to lose those units, we'd
  2618. 1:41:56likely be pushed into the HCR 9%
  2619. 1:42:01financing program, which then is
  2620. 1:42:03competitive, which you know, I can't say
  2621. 1:42:06when we would close with that. And so
  2622. 1:42:08keeping our building at a certain scale
  2623. 1:42:11helps on multiple fronts.
  2624. 1:42:14>> We're doing the housing diversity
  2625. 1:42:16through the
  2626. 1:42:17through the through the heart and those
  2627. 1:42:18will be all up in two years, but we'll
  2628. 1:42:20definitely do those visuals that you
  2629. 1:42:21requested.
  2630. 1:42:22>> Yeah.
  2631. 1:42:23>> Do we know if the parking lot has
  2632. 1:42:25been put out in RFP and there's been
  2633. 1:42:28responses to develop on that?
  2634. 1:42:30They're going to alter it slightly.
  2635. 1:42:33Any issues to be
  2636. 1:42:35to be able to be put on the parking lot
  2637. 1:42:37on the west side?
  2638. 1:42:38We'll get various vehicles for it.
  2639. 1:42:41>> Yeah, absolutely. So we can take one
  2640. 1:42:43from that parking lot for other areas.
  2641. 1:42:45>> But we haven't seen the intersection.
  2642. 1:42:49>> Okay, I got you. I got you.
  2643. 1:42:50>> Uh no, other other intersection. Just
  2644. 1:42:53with the parking lot.
  2645. 1:42:54>> Yeah.
  2646. 1:42:54>> Yeah. Yeah.
  2647. 1:43:09>> The three affordable housing units
  2648. 1:43:12going to be
  2649. 1:43:14solely sourced through Roto?
  2650. 1:43:18>> We will be the managing agent,
  2651. 1:43:20um but the uh
  2652. 1:43:23limited market environment of water of
  2653. 1:43:2540 units.
  2654. 1:43:29>> And we'll do, you know, it's always been
  2655. 1:43:32our precedence to notify the community
  2656. 1:43:34as much as we can that the lottery is
  2657. 1:43:36active to, you know, encourage as many
  2658. 1:43:39applications, especially locally, as we
  2659. 1:43:41can.
  2660. 1:43:42You know, we want people who live in
  2661. 1:43:44Kingston who need an affordable home to
  2662. 1:43:47be the first people to apply for this.
  2663. 1:43:48So, if there's any suggestions of
  2664. 1:43:50organizations we'd like to see us do
  2665. 1:43:52outreach to, we're happy to consider
  2666. 1:43:54that and make sure that we tell them
  2667. 1:43:56that the lottery is active and even give
  2668. 1:43:58them heads up. You know, in the past
  2669. 1:44:00we've done even trainings on like this
  2670. 1:44:02is how you actually apply for it when
  2671. 1:44:03it's a complicated lottery system,
  2672. 1:44:05things like that.
  2673. 1:44:09>> So,
  2674. 1:44:10the parking demand
  2675. 1:44:12and reduction study it came in late. I
  2676. 1:44:15just quickly reviewed it and a couple
  2677. 1:44:17things.
  2678. 1:44:19Um,
  2679. 1:44:20I'm I'm thinking that, you know, what
  2680. 1:44:22might be nice to incorporate into the
  2681. 1:44:25project would be maybe a bus shelter
  2682. 1:44:28along the public right-of-way to
  2683. 1:44:30encourage, you know, ridership um or a
  2684. 1:44:33place for them maybe
  2685. 1:44:36um
  2686. 1:44:36it's not, you know, I know you said you
  2687. 1:44:39would provide information to residents,
  2688. 1:44:42but I'm not seeing the
  2689. 1:44:46intermodal kind of connectivity that I
  2690. 1:44:48would like to see in that study
  2691. 1:44:50identified.
  2692. 1:44:51>> Sure, and we can certainly talk to
  2693. 1:44:54bus operator here and see if there is an
  2694. 1:44:56opportunity for that and at the very
  2695. 1:44:58least do wayfinding, you know, if they
  2696. 1:45:00say you don't want a bus shelter there,
  2697. 1:45:01but do wayfinding of, you know, bus stop
  2698. 1:45:04100 ft this way, whatever it is.
  2699. 1:45:06Certainly want to encourage
  2700. 1:45:08multimodal transit.
  2701. 1:45:12>> Now, with this being in the flood plain,
  2702. 1:45:14what
  2703. 1:45:16are there any specialized construction
  2704. 1:45:18techniques that you're going to use to
  2705. 1:45:21put pilings in or how is
  2706. 1:45:23the support going into the ground to
  2707. 1:45:25bedrock or what
  2708. 1:45:28that look like?
  2709. 1:45:29>> So, our structural engineer is still
  2710. 1:45:31working on that based off the geotech
  2711. 1:45:33report, but um the basic feedback that
  2712. 1:45:35we've gotten is because we're we're
  2713. 1:45:36building up uh the 5 ft uh to do it with
  2714. 1:45:40fill so that we're on slab
  2715. 1:45:43um so that that would prevent having to
  2716. 1:45:46wet flood proof anything.
  2717. 1:45:49Uh so,
  2718. 1:45:50currently
  2719. 1:45:52uh the piles are are pretty standard. Um
  2720. 1:45:55the depths will be based off of the
  2721. 1:45:56geotech report um in terms of like flood
  2722. 1:45:59resiliency, there isn't
  2723. 1:46:01a lot extra that we have to do because
  2724. 1:46:03we're doing uh
  2725. 1:46:04the pile system here.
  2726. 1:46:07>> Geotech says piles
  2727. 1:46:09>> Yeah, mhm.
  2728. 1:46:14>> So, would you be doing um so,
  2729. 1:46:17for the pilings, would you be doing
  2730. 1:46:19you'd be doing compacting, right? From
  2731. 1:46:21what I understood reading the geotech,
  2732. 1:46:23like they would be compacting the soils.
  2733. 1:46:27>> That's what I already said.
  2734. 1:46:28>> Okay.
  2735. 1:46:31Um would you
  2736. 1:46:33be doing any surveying of the adjacent
  2737. 1:46:36properties or monitoring any of the
  2738. 1:46:39buildings that are
  2739. 1:46:40>> Absolutely, yeah. You know, normal
  2740. 1:46:43course of business, we'll do a
  2741. 1:46:44pre-construction survey of, you know,
  2742. 1:46:46our geotech engineer or structural
  2743. 1:46:48engineer will recommend which
  2744. 1:46:49properties, how far it should extend,
  2745. 1:46:51and then we'll do vibration monitoring,
  2746. 1:46:53optical monitoring, whatever is
  2747. 1:46:55necessary per their recommendations.
  2748. 1:47:02>> So, do you I have listed in the agenda
  2749. 1:47:06the New York State Office of Parks,
  2750. 1:47:07Recreation and Historic Preservation as
  2751. 1:47:09a circulating
  2752. 1:47:11uh agency. Do you guys anticipate
  2753. 1:47:15reaching out to them through Chris?
  2754. 1:47:17Because the reason I ask is because what
  2755. 1:47:20I found that would be happening more and
  2756. 1:47:22more recently is once DEC gets it in
  2757. 1:47:25their system, it takes several months.
  2758. 1:47:28Then it goes to OPRHP, and then it's
  2759. 1:47:31like 5 months later you get a letter
  2760. 1:47:33that says, "Oh, we want to see
  2761. 1:47:35everything." So, do you guys
  2762. 1:47:37go to Chris right at the beginning?
  2763. 1:47:39Should we do it? Should we
  2764. 1:47:41>> I don't
  2765. 1:47:43I typically only would have if we were
  2766. 1:47:45doing the coordinating review, which
  2767. 1:47:47which this is not we're treating as a
  2768. 1:47:50activity,
  2769. 1:47:51>> Yeah, my concern my concern is that
  2770. 1:47:53they're going to get it
  2771. 1:47:55and then say, "Okay, we're commenting."
  2772. 1:47:57I mean, even though they're not
  2773. 1:47:59interested agencies can
  2774. 1:48:01>> in the each like if you're going for
  2775. 1:48:03state funding,
  2776. 1:48:05finance agencies
  2777. 1:48:06>> It's going to be in the system.
  2778. 1:48:07>> But that agency may develop a referral
  2779. 1:48:10process.
  2780. 1:48:11>> Okay.
  2781. 1:48:12>> Well, we'll talk when we're
  2782. 1:48:14But you don't you you we can do it
  2783. 1:48:16anywhere we want.
  2784. 1:48:17>> Well, we can check in with HCR if you
  2785. 1:48:19want.
  2786. 1:48:19>> Yeah, I just don't want to find out like
  2787. 1:48:215 6 months after we
  2788. 1:48:23>> Yeah, I don't want to have
  2789. 1:48:25I don't want to have a shovel-ready
  2790. 1:48:26project, but but it's in the hole for
  2791. 1:48:28it.
  2792. 1:48:31Um and so, you had mentioned uh
  2793. 1:48:34settings referring this to the county.
  2794. 1:48:36We did have our gateway meeting with
  2795. 1:48:38Dennis Doyle a few weeks ago.
  2796. 1:48:41No substantial comments came out of
  2797. 1:48:43that. We learned about
  2798. 1:48:45Dennis's personal feelings on brick.
  2799. 1:48:48Uh
  2800. 1:48:51That that was the most controversial
  2801. 1:48:53thing out of there.
  2802. 1:49:00>> They're just saying that
  2803. 1:49:01personal
  2804. 1:49:13>> Okay. So,
  2805. 1:49:14where
  2806. 1:49:16I can't hear you. I'm sorry, but I can't
  2807. 1:49:17hear you.
  2808. 1:49:18Did you hear me?
  2809. 1:49:19Okay.
  2810. 1:49:20>> he's going to be.
  2811. 1:49:20>> Okay. So, we are making the visuals. Do
  2812. 1:49:23you want to see visuals from the
  2813. 1:49:27intersections
  2814. 1:49:29of
  2815. 1:49:29Plaza and Kenchway and looking towards
  2816. 1:49:32the this project.
  2817. 1:49:34>> Um this project alley and Kenchway
  2818. 1:49:36>> Plaza alley and Kenchway and then up
  2819. 1:49:38above from North Front Street looking
  2820. 1:49:41down. Any any other
  2821. 1:49:43>> I think I'd like to see it just kind of
  2822. 1:49:45a sign with the one-story buildings.
  2823. 1:49:47They're not as tall as six stories, but
  2824. 1:49:49look compared next to
  2825. 1:49:51>> Okay.
  2826. 1:49:51>> You know, like Ryan and next You know
  2827. 1:49:53what I'm saying? Like something where
  2828. 1:49:55you can see the surrounding property.
  2829. 1:49:58>> Yep.
  2830. 1:50:01>> We can do the videos.
  2831. 1:50:03>> Um I would do them in both night time
  2832. 1:50:07and day time.
  2833. 1:50:10I don't
  2834. 1:50:11I think the night time particularly
  2835. 1:50:12because if you're going to have the
  2836. 1:50:14um
  2837. 1:50:16top floor have that open
  2838. 1:50:18>> air with the terrace restaurant
  2839. 1:50:20>> the lights and how that might impact
  2840. 1:50:23>> Yeah. We're also just in a doing um EGC
  2841. 1:50:27as part of the ACR process. So, we are
  2842. 1:50:28following the uh dark sky standards in
  2843. 1:50:30the lighting. So, but as is worth
  2844. 1:50:34probably making any kind of light still
  2845. 1:50:35up. So,
  2846. 1:50:37uh we've been They've been looking at
  2847. 1:50:38the light poles through that as it So,
  2848. 1:50:39we'll we'll
  2849. 1:50:40give you some illustrations of that.
  2850. 1:50:46>> I think we have it.
  2851. 1:50:49You
  2852. 1:50:49have it.
  2853. 1:50:52No, we didn't.
  2854. 1:50:53>> Mhm.
  2855. 1:50:57>> I think we brought that in.
  2856. 1:51:03>> Okay.
  2857. 1:51:04>> Now, if everything goes to plan
  2858. 1:51:08then if
  2859. 1:51:10What are the [clears throat] timelines
  2860. 1:51:11you guys are at?
  2861. 1:51:13>> I think I will
  2862. 1:51:14>> Sure.
  2863. 1:51:15So, we have
  2864. 1:51:18pretty aggressive design schedule. We're
  2865. 1:51:20currently on pause until we get the
  2866. 1:51:23feedback from the planning board, but
  2867. 1:51:25when we resume, we'll be resuming with
  2868. 1:51:28design development
  2869. 1:51:29and we have a schedule that will get us
  2870. 1:51:32to 100% CD drawings by the spring.
  2871. 1:51:36In our conversations with HCR, we've
  2872. 1:51:40been talking about a
  2873. 1:51:43late summer closing and we have also
  2874. 1:51:46been talking since this is a tax credit
  2875. 1:51:48project, we need tax credit investor.
  2876. 1:51:52We currently have a couple of
  2877. 1:51:54investors who are interested and are
  2878. 1:51:55holding us our project in their 2027
  2879. 1:51:58pipeline.
  2880. 1:51:59Tax credit equity has gotten very tight
  2881. 1:52:01in the past couple of years and so we
  2882. 1:52:04wouldn't be able to consider financial
  2883. 1:52:05closing [clears throat] without also
  2884. 1:52:06having that sort of piece lined up.
  2885. 1:52:11And then we're underwriting a 30-month
  2886. 1:52:14construction timeline, I believe.
  2887. 1:52:20I'm sorry, the I think it's 24. I'm
  2888. 1:52:23sorry, I'm completing projects.
  2889. 1:52:25>> The fire chief did have some comments
  2890. 1:52:27that I did upload. I don't know.
  2891. 1:52:30You you should get notification when the
  2892. 1:52:32>> We get them as well.
  2893. 1:52:33>> Ours are being asserted.
  2894. 1:52:34>> I just want to make sure you were okay
  2895. 1:52:36because he had some height
  2896. 1:52:38>> Yeah.
  2897. 1:52:38>> complaints and
  2898. 1:52:39>> We looked at that. I know that
  2899. 1:52:41the minimum truck height is 16 ft. Our
  2900. 1:52:45passer were holding 18 ft right now
  2901. 1:52:48under the building itself. Uh but it
  2902. 1:52:51does vary because of the slight grade
  2903. 1:52:53change but it's always at like 16 ft 9
  2904. 1:52:56to 17 ft and a half.
  2905. 1:52:58Um and then there's a lot
  2906. 1:53:00There's some room in there so we can
  2907. 1:53:01play with the design of that. It's still
  2908. 1:53:03in that development further.
  2909. 1:53:04>> And we've been in contact with the
  2910. 1:53:06chief.
  2911. 1:53:07>> We've met with Chris and he actually
  2912. 1:53:09asked for
  2913. 1:53:12proposed swing gate. We So we did two
  2914. 1:53:15parking spots there for now and
  2915. 1:53:18cuz this is the fire department.
  2916. 1:53:19>> Yes.
  2917. 1:53:20>> Will the fire department there?
  2918. 1:53:23And then the other comments were mostly
  2919. 1:53:25regarding the building and alarm.
  2920. 1:53:28>> Yeah, yeah, alarm.
  2921. 1:53:29>> Fire alarm system.
  2922. 1:53:31Okay, the commercial building space.
  2923. 1:53:33>> I find that the layout is a
  2924. 1:53:35>> I just want to make sure
  2925. 1:53:36see those sitting there.
  2926. 1:53:38>> Sometimes we don't know that we say we
  2927. 1:53:41>> Yeah, you upload it and you open a
  2928. 1:53:42notification.
  2929. 1:53:43>> [laughter]
  2930. 1:53:44>> Those things are always getting buried.
  2931. 1:53:48So the referrals are going to be done by
  2932. 1:53:49you or do you guys want to take care of
  2933. 1:53:51and setting the public hearing? Do you
  2934. 1:53:53know what day that will be but when we
  2935. 1:53:56get here?
  2936. 1:53:56>> Uh next meeting November
  2937. 1:54:00I would say
  2938. 1:54:0116.
  2939. 1:54:03>> 16 October.
  2940. 1:54:05>> November 16.
  2941. 1:54:09November 16.
  2942. 1:54:11Be our next meeting.
  2943. 1:54:13>> You guys will be taking care of that or
  2944. 1:54:15do you want me to I you guys take care
  2945. 1:54:17of the notice of
  2946. 1:54:17>> Yes, we will.
  2947. 1:54:19Yeah.
  2948. 1:54:21So that will be the public hearing.
  2949. 1:54:29Do you have any comments on the sub
  2950. 1:54:31notes that we sent?
  2951. 1:54:32>> Um no, I think they were all pretty
  2952. 1:54:34straightforward. So if there's anything
  2953. 1:54:37that comes up as you develop
  2954. 1:54:39>> Okay. We're I'm still pulling from
  2955. 1:54:42water, sewer, and engineering. So as
  2956. 1:54:46soon as we
  2957. 1:54:46I'll make sure we try and get those to
  2958. 1:54:48you as as possible.
  2959. 1:54:49>> Okay.
  2960. 1:54:51So you'll notice both right away when
  2961. 1:54:52you begin the land then. Is that it?
  2962. 1:54:55>> Yes.
  2963. 1:56:15>> [laughter]

About this transcript

This page contains the full transcript of Planning Board Meeting 10-19-2026 by City of Kingston, generated from the public captions YouTube serves with the video. The transcript has 16,166 words across 2,963 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, caption language selection, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.