- 0:28Good evening ladies and gentlemen.
- 0:29Good evening everyone and welcome to the
- 0:31New City of Kingston Planning Board
- 0:33meeting.
- 0:34My name is Suzanne Cahill. I'm the
- 0:36Planning Director of the Board of the
- 0:37City of Kingston.
- 0:39Before we start the meeting, I just have
- 0:40a few quick announcements that I want to
- 0:42go over. If you do have a cell phone,
- 0:44I'm just going to ask that you please
- 0:46put it on silent so that it doesn't
- 0:48interfere
- 0:49with any of the meeting discussion
- 0:51that's going on.
- 0:53I want to let everybody know that this
- 0:56meeting is being recorded and is being
- 0:58live-streamed. So, please please be
- 1:00respectful of that.
- 1:02If we have an emergency, they ask that
- 1:04you please use the stairs not the
- 1:05elevator. If you need assistance, please
- 1:08ask us. We will help you.
- 1:10The restrooms are through the chambers
- 1:13and on the opposite side. As you go
- 1:15through, men's will be to the left,
- 1:17women's to the right. And if you have
- 1:21any conversations outside of those
- 1:24happening with the board, we just ask
- 1:26that you have them outside of the room
- 1:28so that you're not interfering with
- 1:30other discussions that are going on.
- 1:32With that, I am going to turn it over to
- 1:36our standing chair, Matt Belles, for
- 1:38this evening to introduce the rest of
- 1:40the board members and staff that are
- 1:42present.
- 1:44>> Well, good evening folks. Thank you.
- 1:46So, tonight we have Planning Board
- 1:48member Kyra Raji,
- 1:50Vincent Archer,
- 1:52Andrew Harris,
- 1:54and then It's Cahill, Planning Director,
- 1:56Kyla
- 1:58and then older person cats in the back.
- 2:02So
- 2:05First item that the adoption of the
- 2:08September 22nd, 2026 Planning Board
- 2:11meetings that everyone's had a chance to
- 2:12review.
- 2:13Any additions, corrections?
- 2:17No.
- 2:18Motion to approve. Andrew Harris.
- 2:21All in favor.
- 2:23>> I'll second.
- 2:24>> I'll second.
- 2:25>> Thank you.
- 2:26>> All in favor.
- 2:28Okay, we are good.
- 2:30We are going to shuffle a couple agenda
- 2:33items around just for efficiency this
- 2:36evening.
- 2:37Um
- 2:38Get back to it.
- 2:40409 East Chester Street. If you guys
- 2:43could come up to the
- 2:49>> Yes, thank you.
- 3:01>> It's number 10.
- 3:03>> Yeah.
- 3:28>> Okay,
- 3:29item 10 tonight, number 409 East Chester
- 3:32Street. It's a major waiver request to
- 3:35increase the build two zone and decrease
- 3:38the rear yard setback. SBL
- 3:4148.75-9-10.100.
- 3:46Secret determination.
- 3:48That's
- 3:51>> It's
- 3:51>> Type-o.
- 3:53>> Trans-tech zone
- 3:55>> and ward 7, Winston and Tracy and Daly,
- 3:59applicant owners.
- 4:02If you guys just quick intro for the
- 4:04record.
- 4:05>> I'm Tracy Ann and this is the
- 4:07>> Winston, welcome.
- 4:09So, you guys are seeking a building
- 4:12permit to construction addition onto
- 4:13your home?
- 4:14>> Yes.
- 4:15>> Okay.
- 4:16Um
- 4:18So, we have referred this to the uh
- 4:20zoning enforcement. Uh two waivers were
- 4:22identified due to the location of the
- 4:24addition. Just want to give us a quick
- 4:26overview of what you're looking to do.
- 4:29>> So, the main thing that we wanted to do
- 4:31was to put in another playroom because
- 4:33of our parents
- 4:34and um we have a non-verbal
- 4:38uh you know, home. He have a non-verbal
- 4:412-year-old.
- 4:42Um autistic and he
- 4:45He needs sensory So, he's always moving,
- 4:48jumping.
- 4:49And the living room is about our current
- 4:52bedroom and there's no rest for us.
- 4:55>> Okay.
- 4:56>> So, the main thing was to put in
- 4:57additional um
- 4:59playroom. Also, my parents are living
- 5:01with us and the room they're now using
- 5:03is very small.
- 5:05And my mom-in-law has arthritis, so we
- 5:07wanted to do a
- 5:09bigger room also.
- 5:10And so, that's how we came up with the
- 5:13addition.
- 5:14And then we decided to put one room just
- 5:16in case if we have family visits. So,
- 5:19come visit.
- 5:20>> Is it Is it something attached?
- 5:21>> So, then essentially what they're doing
- 5:23is they're following the current
- 5:25building form because of the building
- 5:28lines versus having to bring it more
- 5:31like towards the street, which is a busy
- 5:33street, and keeping it in line and just
- 5:37extending to the side.
- 5:38>> Yes.
- 5:39>> They might put a door.
- 5:41>> We need
- 5:41>> We need We need to leave a little bit of
- 5:43openings.
- 5:45>> Okay.
- 5:46>> So, where
- 5:48So, the parents are living
- 5:50>> Yes, I have a question.
- 5:52>> So, for our waiver checklist, so board
- 5:56will go through these questions with a
- 5:57yes or no
- 5:59uh to help make our determination. So,
- 6:02the applicant has included a waiver
- 6:03request letter that clearly identifies
- 6:05and describes the waiver being proposed
- 6:08accompanied by plans and other visual
- 6:10representations as applicable.
- 6:13>> Yes.
- 6:16I [clears throat] ask
- 6:18Yes.
- 6:18>> Uh
- 6:19in their letter, the applicant describes
- 6:21in detail why the waiver is needed and
- 6:23how the waiver request is consistent
- 6:25with the intent, design, and
- 6:26compatibility of the transect zone in
- 6:29which the project is located.
- 6:32>> Yes.
- 6:32>> Yes.
- 6:37>> Will granting the waiver contribute to
- 6:39the realization of the overall intent of
- 6:41the transect zone helping an improved
- 6:43project which will be an attractive and
- 6:45durable contribution to the transect
- 6:47zone?
- 6:48>> Uh I forgot.
- 6:51>> Uh we have yes or no.
- 6:53>> Yes.
- 6:54>> Yes.
- 6:58>> Uh to support walkable neighborhoods and
- 7:01or mixed-use centers, the project
- 7:03emulates the neighborhood context
- 7:05for how far the building buildings
- 7:07relate to the sidewalk, how the facade
- 7:09is designated, and how the building
- 7:11interacts with the street.
- 7:15>> Yeah, yes. The shape was changed.
- 7:17>> Yes, get continuation.
- 7:21The project supports a green and
- 7:22resilient future, for example, by
- 7:24reducing vehicular miles traveled,
- 7:26providing green infrastructure and or
- 7:28street trees, and or including
- 7:30high-quality usable open space.
- 7:33>> Same applicable to that.
- 7:37>> Project supports incremental development
- 7:40patterns in its size and density that's
- 7:42the towards infill development or the
- 7:44reuse of existing buildings.
- 7:47>> Yeah. Yes. Yes, then.
- 7:50>> The project supports the provision of a
- 7:52variety of housing types to support a
- 7:54range of income levels, age groups, and
- 7:56family units.
- 7:57>> Yeah, I would like the opinion.
- 8:00>> The project specifies street design that
- 8:02is walkable, bikeable, and will
- 8:04reinforce safe, comfortable environments
- 8:07for all users.
- 8:08>> I did.
- 8:11Okay.
- 8:12>> So,
- 8:13>> I think it works, but
- 8:15>> We're good for the waiver.
- 8:16>> Yeah.
- 8:17>> Um so, it just both my eyes those type
- 8:19two.
- 8:20>> Okay, this is
- 8:22a type two in seeker, and then do we
- 8:25have to do a motion and
- 8:26>> Yeah, no objection to approve the
- 8:28waiver.
- 8:28>> Who would like to make the motion?
- 8:30Andrew, second? Kyra.
- 8:32All in favor?
- 8:34>> I.
- 8:34>> Opposed?
- 8:36Okay, passed.
- 8:38>> Thank you.
- 8:41You're all good.
- 8:42>> We can leave?
- 8:43>> Yeah.
- 8:55It's 95 Wilson Avenue, correct?
- 8:58All right, may I go first? Please come
- 8:59on up.
- 9:12Welcome.
- 9:13If we can just get your names for the
- 9:14record.
- 9:16>> Steve Sumida.
- 9:18>> Okay, welcome.
- 9:26So, item 11, 95 Wilson Avenue, major
- 9:30waiver request to install a larger curb
- 9:33cut than permitted. Uh, SBL 48.269-4-8.
- 9:39Secret determination. Uh, it's type two.
- 9:43>> Yes.
- 9:43>> Okay. Transit zone, T3N, ward six.
- 9:48Um, and um,
- 9:49So, pronunciation of your name?
- 9:51>> Kind of like the bird.
- 9:53>> Twee. And Steve Shoemaker, the applicant
- 9:56voters.
- 9:57Um,
- 9:58the applicant is for major waiver for
- 10:00section 405.16.e.3,
- 10:03which limits the maximum current cut to
- 10:0610 ft for a single-family home.
- 10:09Um,
- 10:10remove the existing driveway to add a
- 10:12pool and fenced-in yard. We're now
- 10:13looking to relocate the driveway to
- 10:15accommodate an off-street space for the
- 10:17vehicle. Um, guys, just give us a quick
- 10:20overview.
- 10:22>> Sure. Um,
- 10:23we started this process
- 10:25a little over a year ago.
- 10:27Um,
- 10:28we installed a pool, and we wanted to
- 10:30move the driveway 12 ft from the
- 10:32original
- 10:33area where it was.
- 10:34>> Okay.
- 10:36>> So, yeah, if you see it with the
- 10:37driveway, it was kind of was more over
- 10:39towards the pool.
- 10:41So, we wanted to move the driveway. It
- 10:43would be if you
- 10:45it's on the way towards Wilson about 12
- 10:47ft over over where it originally was.
- 10:51And and um, we're you know, we're asking
- 10:52for a reasonable accommodation cuz we
- 10:53have a adult son with autism.
- 10:56Um, we first initially applied for the
- 10:59permit.
- 11:01Um, they required us to get a survey,
- 11:02which we didn't do.
- 11:05But, it's very confusing because
- 11:08in the emails we've had with the build
- 11:10codes office,
- 11:13they said we didn't need a permit.
- 11:16And the DPW would have to give us five
- 11:18for a permit for them initially, which
- 11:21Mr. Coons came out.
- 11:23I would say it was probably in June of
- 11:25last year. He did a site survey.
- 11:28And he said there isn't any issues with
- 11:30the driveway now. And beyond it wasn't
- 11:32as large as the initial was, you know,
- 11:34with with where the driveway was to be
- 11:35moved and eventually probably because it
- 11:37was
- 11:38from the curb it was 15, possibly 15 ft
- 11:40in the curb, and this is the way it was
- 11:41set.
- 11:43Um
- 11:45so we're going to survey, going to get a
- 11:46survey done until the beginning of this
- 11:48year, and
- 11:50I am kind of dumbfounded why I hadn't
- 11:54even get a survey.
- 11:56Um it's contextual to the adjacent
- 11:58properties still have wide driveway.
- 12:02Some of them built them in recent years,
- 12:03so it's not grandfathered. Some of them
- 12:05been handed on to.
- 12:07We've consulted with some of the
- 12:08neighbors, never had to require a
- 12:09survey.
- 12:10But primarily, like I said, what we're
- 12:12doing the uh
- 12:14the alterations to our home is because
- 12:16of our our oldest son, who's 23, with
- 12:18severe autism.
- 12:20And uh we're currently parked on the
- 12:22street, and we haven't been able to do
- 12:24anything until we resolve this, and it's
- 12:26very unsafe.
- 12:28We you know, for him to go out on the
- 12:29street because sometimes he he's
- 12:31anxious.
- 12:32You know, getting in and out of the car,
- 12:34you know, sensory needs, sometimes he
- 12:36he you know, he has a little anxiety and
- 12:38everything, and we even actually had two
- 12:40letters thrown in our yard com- that's
- 12:42complaints over the last, let's say, 6
- 12:45months.
- 12:46You know, anonymous letters get kind of
- 12:48really
- 12:49you know, uh degrading us and stuff
- 12:50about us and our situation, about, you
- 12:52know, parking on the street with a child
- 12:54having a kid with a
- 12:55a child with a condition, you know,
- 12:57you're you're not a good parent. So, you
- 13:00know, uh we did consult with an
- 13:02attorney, and of course they felt like
- 13:05we would be better off applying for a
- 13:06reasonable accommodation and to see if
- 13:08we can get this resolved. We
- 13:11>> Basically, just so there's an under-
- 13:13Just so the board has a little bit of
- 13:15background, residential properties are
- 13:17allowed more than 10 ft wide per car.
- 13:20They're asking for a per car that's
- 13:22larger than typical would be for a
- 13:25normal residential use, but they did in
- 13:28their application also provide
- 13:30representative examples of other
- 13:32properties within close proximity that
- 13:35have the same type of double wide
- 13:37driveways. So,
- 13:38it's a pretty
- 13:40standard regular task.
- 13:52>> Would there be any issue with not
- 13:54approving this?
- 13:56>> Okay. So, do you need to just go through
- 13:57the checklist?
- 14:20>> The applicant has included a waiver
- 14:22request letter that clearly identifies
- 14:23and describes the waiver being proposed,
- 14:25accompanied by plans and other visual
- 14:27representations as applicable.
- 14:29>> Yes.
- 14:31>> Yes.
- 14:33Uh
- 14:33in their letter,
- 14:34the applicant describes in detail why
- 14:36the waiver is needed and how the waiver
- 14:38request is consistent with the intent,
- 14:40design, and compatibility of the
- 14:42transect zone in which the project is
- 14:44located.
- 14:45>> Yes.
- 14:45>> Yes.
- 14:47Uh will granting the waiver contribute
- 14:49to the realization of the overall intent
- 14:51of the transect zone and result in a
- 14:53improved project which will be an
- 14:55attractive and durable contribution to
- 14:57the transect zone.
- 14:59>> Yes.
- 15:02>> To support walkable neighborhoods and or
- 15:04mixed-use sectors, the project emulates
- 15:07the neighborhood context for how the
- 15:08building buildings relate to the
- 15:10sidewalk, how the facade is designed,
- 15:12and how the building interacts with the
- 15:14street.
- 15:15>> Yes.
- 15:16>> I'm going to go with that, but
- 15:18Vince, yes.
- 15:20Yes.
- 15:22Uh the project supports a green and
- 15:24resilient future
- 15:26uh by for example reducing vehicular
- 15:28miles traveled, providing green
- 15:30infrastructure, and or street trees, and
- 15:32or including high-quality usable open
- 15:35space.
- 15:37>> Not applicable to me.
- 15:38>> Yeah, in a day.
- 15:40Uh the project supports incremental
- 15:42development patterns in its size and
- 15:44density and supports an infill
- 15:46development or the reuse of existing
- 15:48buildings.
- 15:52>> In a day.
- 15:56>> Project supports the provision of a
- 15:57variety of housing types to support a
- 15:59range of income levels, age groups, and
- 16:02family units.
- 16:05Project specifies street design that is
- 16:07walkable, bikeable, and will reinforce
- 16:09safe and comfortable environments for
- 16:11all users.
- 16:13>> Yes, I'll complain.
- 16:15>> Yes.
- 16:16>> In a day.
- 16:18>> Uh
- 16:19Oops, sorry.
- 16:20>> You got one vote for this.
- 16:21>> So,
- 16:22you're not applicable to that?
- 16:24Or for the same
- 16:27looking at 50 cents in Seattle.
- 16:29>> I think it's in a
- 16:31>> You think it's not applicable?
- 16:32>> Yeah.
- 16:33>> Well, you're now
- 16:34The reason why you said it last is
- 16:36because it's
- 16:38The only person that's not
- 16:40>> [clears throat]
- 16:40>> able to
- 16:44be safe
- 16:45and use the environment comfortably is
- 16:47our son.
- 16:49So, this would include him.
- 16:52And therefore, it would be
- 16:55specific to the walkable
- 16:58area which is the
- 16:59curb cut on the sidewalk.
- 17:06>> So, you're going to have to take a vote
- 17:09of
- 17:09one on
- 17:11the total overall
- 17:13waiver.
- 17:17>> Okay. So, um
- 17:20I guess we're going to do a board vote
- 17:22and then approve the waiver?
- 17:24>> And then we got motion.
- 17:26>> Make a motion.
- 17:27Um to approve this waiver.
- 17:30>> Yep.
- 17:30>> Yes, second.
- 17:31>> Second.
- 17:32>> Okay.
- 17:33All right, I.
- 17:34>> I.
- 17:36>> Okay, opposed?
- 17:38>> That's okay.
- 17:39>> I vote yes.
- 17:40>> Okay.
- 17:40>> Okay.
- 17:40>> So, it's approved.
- 17:42>> Right.
- 17:55You good?
- 17:56>> Okay.
- 17:57>> All right, may I have a motion to
- 17:58adjourn?
- 18:00>> And then can we do the meeting on Zoom?
- 18:02>> Baby Paul.
- 18:08>> Uh item number two, 370 Albany Avenue,
- 18:13public hearing for administrative
- 18:14special permit renewal to operate a car
- 18:16wash.
- 18:18Is anyone here for 370?
- 18:21>> Which is 370?
- 18:22>> They need to be here to speak.
- 18:23>> Oh, to speak on 370 Albany Ave.
- 18:29>> I'm ready to close the public hearing to
- 18:31you.
- 18:32>> You make a motion to close?
- 18:34>> Yep.
- 18:34>> All right, motion to close the public
- 18:36hearing at 370.
- 18:38And you second.
- 18:39I motion then second.
- 18:53>> Second and you can get out.
- 18:54>> All righty, let's
- 19:05All right, 713 Gerald Street,
- 19:08subdivision of lands of Travis Myers,
- 19:10SBL 56.357-14-2.
- 19:16seeking a determination type two trans x
- 19:18zone T4N ward seven.
- 19:23Travis Myers applicant's owner.
- 19:26Is anyone here for 713 Gerald Street?
- 19:35>> And that piece of land so
- 19:38basically what this one is and if you
- 19:41recall
- 19:43about a year or so ago we reviewed a
- 19:46application to combine two parcels into
- 19:48one. He had a proposal to develop a four
- 19:52unit row house type of structure.
- 19:56Financially that has economically become
- 19:59unfeasible for him. So he is now
- 20:03reverting back wanting to separate the
- 20:05parcels again. He's going to sell one
- 20:07off and retain the other.
- 20:10Pretty straight forward here. We'll need
- 20:11some
- 20:15>> Any questions from the board?
- 20:18>> Yes,
- 20:19this is unlisted.
- 20:23>> Right. So it's good
- 20:26make a motion to
- 20:28>> I make a motion to place it on
- 20:30action.
- 20:30>> So this is an unlisted action.
- 20:33>> I make a motion
- 20:34>> What else?
- 20:34>> I make a motion to approve the
- 20:36>> It's already.
- 20:48This looks to be in order.
- 20:50I'll make a motion to accept the short
- 20:53environmental assessment form.
- 20:55Vince Andrews seconds.
- 20:58All approved.
- 21:00Opposed.
- 21:04>> I make a motion to sign the best.
- 21:06>> No, they are often made
- 21:26>> You saw any Are there any questions on
- 21:28this?
- 21:29I'm not Well, I would need What's that?
- 21:32So, we will need five paper copies, one
- 21:36minor.
- 21:38You don't need time to read the other
- 21:39instructions.
- 21:41The board um
- 21:45They can be signed and we will need
- 21:49uh
- 21:50the owner's signature
- 21:53before the chairman and sign off on it.
- 21:57Found last.
- 22:00And for policy six.
- 22:02>> Okay.
- 22:02>> Those are the additions.
- 22:07>> Yeah.
- 22:10>> That was my question.
- 22:12>> Right.
- 22:12>> Um motion to approve this?
- 22:15Andrew, second.
- 22:18Karin.
- 22:20All in favor?
- 22:21Opposed?
- 22:23>> All right.
- 22:23>> It's passed.
- 22:25>> Thanks.
- 22:28Chairman.
- 22:28>> All right. And we have Fagus, 79 German
- 22:31Street.
- 22:34Um so, good evening. We're going to hang
- 22:37on one sec. So, this is a subdivision of
- 22:39lands of
- 22:41uh
- 22:42three FFRE LLC and a major waiver for
- 22:46rear yard setback.
- 22:48SBL 56.42-14-21.
- 22:52Uh secret determination type two.
- 22:56It's correct zone. Transaxle.
- 22:58>> Oh, I'm listed. Sorry.
- 22:59>> I'm listed.
- 23:00>> Transaxle, T4N, uh Ward 8, Michael Betar
- 23:04applicants,
- 23:05uh 3 F F R E is the owner.
- 23:09>> Welcome.
- 23:10>> Thank you.
- 23:10>> And just quick name for the record?
- 23:12>> Mike Betar, surveyor.
- 23:14Uh I'm representing the Frescos and 3 F
- 23:16F R E LLC.
- 23:18Uh we have two homes situated on one lot
- 23:22on the corner of German and Ridge. Um
- 23:26pictures of the homes here. I know you
- 23:27guys have them in the application, but
- 23:29obviously we have fronting on German
- 23:33and then we have the brick home fronting
- 23:34on Ridge. I tried to get some decent
- 23:36pictures here to show the spacing and so
- 23:38on, but they are in the application. Um
- 23:42so we're trying to separate the two
- 23:44houses into separate deeded lots. Uh we
- 23:47come into a few things that um not only
- 23:49the planning department, but the
- 23:51building department um is interested in
- 23:53including the spacing between the
- 23:55structures
- 23:56uh being a building department related
- 23:58item, the offset to the rear of the
- 24:00building being a waiver related
- 24:04mathematical item. Uh but we are with in
- 24:07terms of our lot coverage, we are um you
- 24:09know, we're good to go. We don't we
- 24:11don't we're not even close to the lot
- 24:14coverage um
- 24:15percentages. Um we've designed the new
- 24:19line to meet all of the 5-ft spread as
- 24:22required by the building department. Uh
- 24:25we've created an easement to bring
- 24:28utilities into the brick rear structure.
- 24:32Uh
- 24:32we are seeking the variance aka waiver
- 24:36for the rear um
- 24:40yard setback and otherwise
- 24:44um we are you know, looking to get some
- 24:46type of
- 24:47uh two separate deeded homes uh each
- 24:51having different frontage. Brick home
- 24:53fronting on Ridge Street with the front
- 24:54facing Ridge Street, German obviously
- 24:56facing German Street. Uh so they already
- 24:59have a a view of being separated. We're
- 25:02just trying to officially separate them.
- 25:05Um and that's basically the
- 25:09just of the story.
- 25:13>> Um just want to talk about the easement
- 25:15that is going to be required as well.
- 25:17Mike
- 25:18>> For the the utility easement, yes. So in
- 25:21order for us to get the 5-ft spread,
- 25:24uh we have to have an easement for the
- 25:26gas to
- 25:28um connect to the brick structure. We're
- 25:31obviously close in this area here. Um
- 25:34and there is a picture of that area um
- 25:36well defined in the application uh
- 25:39looking down between the structures. Um
- 25:44small easement um
- 25:47you know uh
- 25:48L6 is on here is uh you know they're
- 25:51small distances. L4 being 21 ft. So it's
- 25:55roughly 20 by 5-ft on one end. So it's
- 25:59maybe 100 sq ft.
- 26:02125 sq ft max.
- 26:12Questions from the board?
- 26:15>> Is there a new utility pole or is this
- 26:17>> No, that's an under line that's an
- 26:19underground gas line that's probably
- 26:21from the you know the '80s '70s '80s
- 26:24when the gas went in.
- 26:27>> No, I was talking about the utility
- 26:28pole.
- 26:29>> Oh, the utility pole?
- 26:30>> Yeah.
- 26:31>> Um no, that's been there. That's how
- 26:32they've always got electric and that
- 26:34actually really doesn't come into play.
- 26:36Luckily for us the the overhead
- 26:38utilities are already well split. The
- 26:40only item that we have is the
- 26:43underground gas that requires an
- 26:45easement through lot two to attach to
- 26:47lot one.
- 27:02>> Oops.
- 27:04What is the distance?
- 27:06>> Relatively straight forward.
- 27:09>> Okay.
- 27:10And then you need to do the waiver
- 27:12setback or the computer setback
- 27:16to say you understand it's a tight fit
- 27:18with the fire
- 27:19your setback is still okay and maybe
- 27:22they got blocked in line in the building
- 27:24entrance on German Street
- 27:28and it's a setback of only 5 ft versus
- 27:3110.
- 27:32>> Also, one thing to speak on on the
- 27:35waiver is in terms of contextual for
- 27:39that neighborhood 10 ft would be less
- 27:42contextual than what we're asking for
- 27:45based upon the fact that the Delaware
- 27:46Hudson Canal lots are obviously very
- 27:48congested. You know, the houses or some
- 27:50of them are
- 27:52in this neighborhood there are many
- 27:53structures which are party wall lines.
- 27:55So there's no setbacks whatsoever. So in
- 27:58terms of the overall look and context,
- 28:02this fits
- 28:03with the overall look of the
- 28:05neighborhood. There's nothing out lying
- 28:07here that's saying, "Oh my God, there's
- 28:08only a short amount." Everything is a
- 28:10short amount in that neighborhood
- 28:11specifically those few streets in that
- 28:13block. You have some tight buildings in
- 28:16there.
- 28:17That's probably how they got built
- 28:19together on one lot in the first place.
- 28:23>> So if that one of the houses faces here
- 28:27and one of them is
- 28:28facing here. Look, the setback line is
- 28:31the correct or the setback is similar in
- 28:35here and it's
- 28:37and then in the middle of it the fire
- 28:38department would have Yeah, they would
- 28:39have to make
- 28:40comply with the safety I'm not a
- 28:42problem. That's all.
- 28:43>> [clears throat]
- 28:44>> So just to give you a better idea of
- 28:46also like here, I know you're talking
- 28:48about the furniture. So, here's the
- 28:49picture of the house fronting on
- 28:51Germany. So, we have this white frame
- 28:53structure. Here is the house fronting on
- 28:55Ridge, the brick structure. And then
- 28:57this is the spacing between. So, we have
- 29:00a 5-ft spread coming down through here
- 29:02to get these two. So, there's still
- 29:04walkable area on both sides of the
- 29:05boundary line. And that easement that I
- 29:07show is right here going in the gas line
- 29:10cuz you can see the gas meter on the
- 29:11house right there.
- 29:13And then this is actually our
- 29:14neighboring house right here. So, again,
- 29:17the lots are tight in this area.
- 29:20Uh but that is neither here nor there.
- 29:22>> Would that be anything to do with it
- 29:23being a double ending?
- 29:24>> No, no. It's just It's a separately
- 29:27separated property on the end of the
- 29:28block.
- 29:30>> Okay.
- 29:31>> But it's just a potential thing.
- 29:33I mean, they're all in there even using
- 29:35the black system.
- 29:37But they're not separate.
- 29:39>> Mhm.
- 29:39>> They're not separate lots either.
- 29:42>> All right.
- 29:43The applicant has included a waiver
- 29:45request that clearly identifies and
- 29:47describes the waiver being proposed,
- 29:49accompanied by plans and other visual
- 29:51representations as applicable.
- 29:54>> Yes.
- 29:56>> In their letter, the applicant describes
- 29:58in detail why the waiver is needed and
- 30:00how the waiver request is consistent
- 30:02with the intent, design, and
- 30:03compatibility of the transect zone in
- 30:05which the project is located.
- 30:07>> Yes.
- 30:08>> Yes.
- 30:10>> Will granting the waiver contribute to
- 30:12the realization of the overall intent of
- 30:14the transect zone and result in an
- 30:16improved project which will be an
- 30:18attractive and durable contribution to
- 30:20the transect zone?
- 30:23>> So.
- 30:24>> Okay.
- 30:28>> To support walkable neighborhoods and or
- 30:30mixed-use centers, the project emulates
- 30:32the neighborhood context for how far the
- 30:34building
- 30:35buildings relate to the sidewalk, how
- 30:37the facade is designed, and how the
- 30:39building interacts with the street.
- 30:43>> And I agree.
- 30:45This is our assistant.
- 30:47Project supports a green and resilient
- 30:49future by, for example, reducing
- 30:52vehicular miles traveled, providing
- 30:54green infrastructure and or street
- 30:55trees, and or including high-quality
- 30:58usable open space.
- 31:03Project supports implementation of
- 31:04development patterns that enhance
- 31:06density and supports infill development
- 31:08or the reuse of existing buildings.
- 31:13Project supports the provision of a
- 31:15variety of housing types to support a
- 31:17range of income levels, age groups, and
- 31:19family units.
- 31:24Project specifies street design that is
- 31:26walkable, bikeable, and will reinforce
- 31:29safe and comfort comfortable
- 31:31environments for all users.
- 31:36Okay, so
- 31:38approved.
- 31:42>> I will then point out one thing. I don't
- 31:44have a policy six on this map. Uh just
- 31:47as it's been going back and forth
- 31:48between the building and planning
- 31:49department. We'll add that as we get it
- 31:51more board.
- 31:55>> We have those conditions with G. Uh What
- 31:57are we supposed to do on this thing?
- 32:04>> This looks to be complete.
- 32:09>> [clears throat]
- 32:13>> We have a motion to accept the short
- 32:16environmental assessment form.
- 32:18>> Make a motion to accept.
- 32:20>> All right, second Spence.
- 32:23All in favor?
- 32:25Opposed?
- 32:41>> And and
- 32:43so the motion would be for
- 32:46approval of the one or subdivision with
- 32:50road policy six including the major
- 32:53waiver putting their setback
- 32:55submission of five paper and one minor
- 32:58copies
- 32:59given descriptions for filing including
- 33:02the easements with the end of the
- 33:04restrictions and all signed by the owner
- 33:07before the chairman's signature.
- 33:10>> Motion?
- 33:13>> Thanks.
- 33:13>> Second.
- 33:14>> Andrew?
- 33:15>> Andrew.
- 33:18>> All approved.
- 33:20Opposed?
- 33:22>> Approved.
- 33:22>> Good.
- 33:23>> So thank you and Sue, if you want to you
- 33:26know in a when you have time in an email
- 33:27or whatever um
- 33:29lead me to where you want me to go next.
- 33:31I know we talked about the building
- 33:32department having to approve them of the
- 33:35subdivision after the subdivision
- 33:36approved. So
- 33:38if it's dropping these off or an email
- 33:40copy or whatever to get these things
- 33:42moving forward, please advise.
- 33:45Thank you everybody.
- 33:46>> Thank you.
- 33:47>> Have a good night.
- 33:47>> You too.
- 33:52>> Hello Randy.
- 33:54So
- 33:55>> Hello Randy.
- 33:55>> Yep.
- 33:56So item five 298 to 300 302 to 318 392
- 34:02306 Old Boulevard 262 Boulevard 43 to 75
- 34:07Halbert Street extension
- 34:09308 to 318
- 34:12Old Boulevard 45 to 49 Handy Street lot
- 34:16line revision to combine seven lots into
- 34:19three
- 34:20SBL 56.48-2-7.100
- 34:25and 7.200
- 34:288 9 10.100
- 34:3211 and 12 secret determination.
- 34:36Type two Ransack Zone T3 and
- 34:41019
- 34:43P&D Group LLC is the applicant owner. So
- 34:47welcome.
- 34:49Call Arias from Banarian Arias. Our firm
- 34:52representing the applicant Jeff
- 34:55of the P&D Group.
- 34:57Our firm did the survey and subdivision
- 35:00work.
- 35:01>> They're studying it up.
- 35:03>> Do I have
- 35:04I don't know if [clears throat] I can
- 35:05get one of these.
- 35:07>> They have them in their notes.
- 35:27They do have a copy of anything else
- 35:29that you want to do. Sorry, it's just
- 35:30taking you
- 35:32>> The owner applicant
- 35:34owns a total of eight lots here,
- 35:37adjacent lots. One of them,
- 35:39this one here that fronts 32, will
- 35:42remain the same. The other seven lots
- 35:45will be essentially consolidated into
- 35:48three lots for a total of four total
- 35:51lots
- 35:53essentially to accommodate
- 35:56potential future development
- 35:59of these four lots.
- 36:01I believe we're seeking two major
- 36:03waivers
- 36:05for exceeding the maximum lot width and
- 36:08lot depth.
- 36:10These
- 36:11dimensions were already
- 36:14exceeding the lot width and depth
- 36:17in their current state, but as a result
- 36:20of creating new lots under the new
- 36:22zoning,
- 36:23the waiver is required.
- 36:30>> So, they existed
- 36:32outside and they spelled out what is
- 36:34unique current gains on each lot.
- 36:37>> Correct. Well, there's multiple lots to
- 36:39what they're doing is kind of
- 36:42shifting property line and consolidating
- 36:45seven to three, right?
- 36:48Um the if you're familiar with the
- 36:51location where the electric is located,
- 36:56um the business will stay primarily
- 36:58they're consolidating those upper lots
- 37:01on the top portion.
- 37:03>> We'd be deleting lot lines here.
- 37:06>> And then
- 37:06>> And then
- 37:07>> And down below they're shifting that
- 37:09over to create two new lots that will be
- 37:14primarily, I guess, developed as
- 37:16residential new residential housing
- 37:18parcels.
- 37:24So, the access off of both Albert and
- 37:27Condi Street.
- 37:33>> So, the the the waiver ask is based on
- 37:38>> The
- 37:39the current lots do exceed that width
- 37:42and depth.
- 37:43Um so, it's not really um
- 37:45it's it's not like the subdivision
- 37:48made these lots much larger.
- 37:51>> So, the the plan base code has
- 37:54maximum
- 37:56depth and maximum widths.
- 37:58>> Right.
- 37:59>> So, just by shifting a line, we meet two
- 38:02of those dimensional
- 38:05requirements. So, they do need
- 38:07the waivers in order to exceed those
- 38:10dimensional requirements on the lower
- 38:12portion.
- 38:13>> But, it's just written in relation to
- 38:15the actual property. It's not because of
- 38:17the structure.
- 38:17>> Correct. Yeah, there's no structures
- 38:20where they are they're to be new
- 38:21buildings, new houses.
- 38:23>> So, if you had an an existing
- 38:27line
- 38:28that
- 38:30now falls under
- 38:32not being compliant under the form-based
- 38:34code now,
- 38:36what would be the issue in making it
- 38:38compliant with the current form-based
- 38:40code?
- 38:43I feel like I need
- 38:45>> multiple small
- 38:47>> I think cuz they're combining parcels.
- 38:50>> They're adding They're adding properties
- 38:53together. They're creating larger two
- 38:56larger parcels on the lower section and
- 38:59one parcel on the upper section. So, by
- 39:02combining all of the properties
- 39:04together, the lower the lower parcels
- 39:06exceed the dimensions.
- 39:09>> They're
- 39:09>> Cuz it's 100 ft wide.
- 39:11>> It's the It's the sort of nature of the
- 39:13the property.
- 39:15>> They're getting larger. Yeah.
- 39:18They're larger.
- 39:19>> Yeah.
- 39:21>> And then the depth is 180 ft. This goes
- 39:24past those.
- 39:25Because of taking multiple small
- 39:28combined into
- 39:29fewer larger lots.
- 39:31>> Okay.
- 39:37>> Any questions?
- 39:39>> Thanks. Thank you.
- 39:41>> But the checklist
- 39:43>> Yes, we should have one.
- 39:45We have one.
- 39:47>> Okay.
- 39:50>> They have one.
- 39:52>> What Yeah, we created one for both
- 39:54because they're both dimensional.
- 39:56>> That's right.
- 39:57All right.
- 39:59Uh the applicant has included a waiver
- 40:01request that clearly identifies and
- 40:03describes the waiver being proposed,
- 40:05accompanied by plans and other visual
- 40:07representations as applicable.
- 40:09>> Yes. Yeah.
- 40:11>> In their letter, the applicant describes
- 40:13in detail why the waiver is needed and
- 40:15how the waiver request is consistent
- 40:17with the intent, design, and
- 40:18compatibility of the transect zone in
- 40:20which the project is located. Yes.
- 40:26Granting the waiver
- 40:28Will granting the waiver contribute to
- 40:29the realization of the overall intent of
- 40:31the transect zone and result in improved
- 40:34project, which will be an attractive and
- 40:35durable contribution to the transect
- 40:38zone.
- 40:39Yes.
- 40:42To support walkable neighborhoods and or
- 40:44mixed-use centers, the project emulates
- 40:47the neighborhood context for how far the
- 40:48building buildings relate to the
- 40:51sidewalk, how the facade is designed,
- 40:53and how the building interacts with the
- 40:54street.
- 40:55Yes, it can.
- 40:58Project supports green and resilient
- 40:59future by, for example, reducing vehicle
- 41:02miles traveled, providing green
- 41:04infrastructure and or street trees, and
- 41:06or including high-quality usable open
- 41:08space.
- 41:11Yes,
- 41:12it can.
- 41:13Project supports incremental development
- 41:16in its size and density and supports
- 41:18infill development or the reuse of
- 41:20existing buildings.
- 41:23Yes, it can. Yes.
- 41:26Your choices
- 41:27So, this
- 41:31Use the existing building as one
- 41:32building on the They just rolled right
- 41:34out. Is that Yes. Uh yes.
- 41:38Supports infill development or reuse of
- 41:41existing Yes.
- 41:43Yes, it can.
- 41:45Project supports the provision of a
- 41:47variety of housing types to support a
- 41:49range of income levels, age groups, and
- 41:51family units. Yes,
- 41:54it can.
- 41:55Project specifies street design that is
- 41:57walkable, bikeable, and will reinforce
- 41:59safe and comfortable environments for
- 42:01all users.
- 42:03Yes, it can.
- 42:05Good.
- 42:07So, that's approved. So, now Motion to
- 42:10accept. Mhm. All right. Motion Andrew
- 42:15who would like to second
- 42:20all in favor
- 42:22opposed
- 42:25this passed.
- 42:42Almost there.
- 42:53I think it's five right now.
- 42:59>> Ordinance
- 43:016
- 43:02>> Motion
- 43:03>> And waivers approved
- 43:06will gradually buy paper copies one
- 43:09mylar
- 43:10written scriptures will need to be
- 43:12submitted with the result parcels and
- 43:15the event by the national meeting to be
- 43:17signed by the owner or the chairman and
- 43:20then provided with the Ulster County
- 43:21Planning Board with all the details.
- 43:23>> I have them one mylar.
- 43:24>> Five paper one mylar.
- 43:26>> All right, thank you.
- 43:29>> That's the second motion.
- 43:31>> Okay, so a motion from Kai second Andrew
- 43:37all in favor
- 43:39opposed.
- 43:41Passed.
- 44:08>> I have a question.
- 44:11>> 40 Thomas Street.
- 44:15>> 40 Thomas Street.
- 44:24>> What's that?
- 44:26Up next,
- 44:27item six, 40 Thomas Street, public
- 44:30hearing for administrative special
- 44:32permit renewal to operate an emergency
- 44:35shelter. SBL 56.25-4-44. Secret
- 44:37determination,
- 44:41this one too.
- 44:42>> Type two.
- 44:43>> Type two. Transect zone T5F, ward five,
- 44:47Family of Woodstock, applicant owner.
- 44:51So, any
- 44:52>> This is basically style of a caring
- 44:54neighborhood building.
- 44:56So,
- 44:57no one is
- 44:58>> Anyone have
- 44:59>> Speak.
- 45:02Close the hearing, we're done.
- 45:04>> Hearing is now closed.
- 45:07>> Okay.
- 45:09Good.
- 45:10>> Okay.
- 45:10>> All set.
- 45:11>> All right, item number seven, 25 Fields
- 45:14Court.
- 45:16Site plan and waivers to construct a
- 45:17mixed mixed-use building with commercial
- 45:20on the ground floor and residential
- 45:23above.
- 45:24SBL 56.25-3-25.
- 45:28Secret determination, this one too.
- 45:31Secret determination.
- 45:32>> This this will be a type two.
- 45:35>> Okay.
- 45:35>> But this is a type two.
- 45:36>> This will be a type two secret
- 45:37determination.
- 45:39Transect zone T5F, ward four, Keith
- 45:42Leibold, applicant, City of Easton,
- 45:45owner.
- 45:46So, we'll vote.
- 45:48>> It's public hearing, so is anybody from
- 45:51the public that wants to speak on this?
- 46:02>> Might be a something like that.
- 46:04>> Um
- 46:05>> [laughter]
- 46:06>> Sarah Vasky.
- 46:07>> Okay. We could introductions for the
- 46:10record, please.
- 46:11>> Sure. Good evening, ladies. Michael
- 46:12McGarvey, I'm the project engineer for
- 46:13this application for the board. I have
- 46:15here with me Mr. Keith Wagner from the
- 46:17school development team.
- 46:19>> Okay.
- 46:20>> I
- 46:21see Denise is online. Is she going to
- 46:25>> She has a few town
- 46:26>> She She's
- 46:27>> I'm here and I'm happy to share screen.
- 46:30>> But there's a lot of things
- 46:32>> too. I'm not sure what people whatever
- 46:33one prefers.
- 46:39>> Welcome, folks. Would you like to just
- 46:41walk us through?
- 46:42>> Sure. I brought hard copies. Let's see
- 46:44if I can bring the site plan up on the
- 46:46screen.
- 46:47Standish on Raven Street site plan.
- 47:03>> Can everyone see the screen?
- 47:05>> Yep.
- 47:06>> Yes.
- 47:06>> Great.
- 47:08>> Okay. So, as you noted earlier, the site
- 47:11location is 25 Field Court. It's at the
- 47:13end of Field Court on this side and near
- 47:17the intersection of O'Neal Street and
- 47:18Midtown Linear Park at that location.
- 47:21The existing site actually consists of
- 47:23an abandoned commercial building.
- 47:26The entire site's paved or impervious
- 47:30previous eligibility.
- 47:31We're in the T5 flex zone for this
- 47:35particular project and we're proposing
- 47:3771 units and five stories. It's got an
- 47:40attic and a partial basement. We are
- 47:42seeking waivers
- 47:44as a part of this project 3405
- 47:4716 E3 405 16 at 405 16 J, respectively.
- 47:54We're also proposing
- 47:5635 parking spaces. Standish, you can on
- 47:59the safe line pretty much.
- 48:01Um we're proposing 35 parking spaces
- 48:04and we've designed storm water detention
- 48:06areas in this portion of the lot and
- 48:08under the parking space over here in
- 48:11that portion of the lot. Um so, outside
- 48:14of those waivers that we're requesting,
- 48:15it appears that the project's fully zone
- 48:17compliant I believe.
- 48:19Um
- 48:20We prepared landscaping plan, lighting
- 48:22plan
- 48:23Well, it's already he doesn't go along
- 48:25with it.
- 48:27That's basically the project in a
- 48:29nutshell.
- 48:30Okay.
- 48:31I think our plan was to get feedback
- 48:33from this meeting and then incorporate
- 48:35the comments from the last meeting and
- 48:36this meeting and have those measured
- 48:38fairly quickly. We've
- 48:40addressed most of what percent this
- 48:41already I think all of that or
- 48:44>> So, you got
- 48:44>> Listen to me.
- 48:45>> You've gotten your staff comments back
- 48:47and obviously we just received the this
- 48:50is kind of town board comments.
- 48:53You've seen those.
- 48:55Um
- 48:56they've been posted online as well. So,
- 49:00um have you had a chance to take a look
- 49:02at them and give consideration or any
- 49:05thoughts on I know one of them was
- 49:08pedestrian access egress and Guild Ford
- 49:12and Sue and Neil Street. Another one was
- 49:15to um and I don't know if you got this
- 49:18coming up to you know what you got this
- 49:19as well they came in Friday. But another
- 49:22one was to provide for some additional
- 49:25uh visual um
- 49:28concept
- 49:30drawings to show in the evening and
- 49:33daytime and shadowing um impacts that
- 49:36could potentially lead to the um green
- 49:39line along the
- 49:41halfway there.
- 49:43Have you looked at that?
- 49:44>> What I'm what we kind of said in that
- 49:46was we were confused by that one because
- 49:48we gave
- 49:49you the visuals of all four sides of the
- 49:51building and you can get a visual of
- 49:52some flash
- 49:54through the sunset. It will
- 49:56Yeah, and it will cast a shadow at
- 49:58certain times of the day, and you see
- 50:01it's right up against the
- 50:02>> I think one of the things that the board
- 50:05is going to be interested in seeing are
- 50:09a little bit more of the architectural
- 50:11detail in into the visual simulations as
- 50:16well as the nighttime renderings. Um
- 50:19some of the the renderings that were
- 50:21provided you know, leave a lot of
- 50:23question about window treatments and and
- 50:27materials
- 50:28um
- 50:29and that. So, I think a little bit more
- 50:31detail on those would be um helpful in a
- 50:35final evaluation. Interesting. What it's
- 50:38going to look like from different
- 50:39vantage points, not only from the real
- 50:42line but from the adjoining streetscape,
- 50:45um would be good.
- 50:47>> The work that was provided you know, it
- 50:49doesn't really render the the building
- 50:51details well when you
- 50:53reduce the scale so much. But I tried to
- 50:55blow it up and maybe if I showed you a
- 50:57section
- 50:58of each you kind of get a feel for the
- 51:00architectural
- 51:01>> Yeah, see like the cources, the sills,
- 51:04the lintels, the building material of
- 51:07the facade. That just goes little
- 51:09details.
- 51:10>> No, I understand that we're we're just
- 51:12talking about that today but you know,
- 51:13you can't you just can't see it at that
- 51:15scale. But the first floor is going to
- 51:17be brick and then the upper floors will
- 51:19be various types of concrete siding.
- 51:23>> Then even the coloring if there's
- 51:24variations throughout that and it's
- 51:26two-tone, three-tone, or whatnot.
- 51:28>> Yeah.
- 51:29>> I think a night a nightscape or night
- 51:31scene.
- 51:31>> You want a nightscape as well?
- 51:33We did one There's one rendering of we
- 51:36did it sunset
- 51:39of the main next to the sales office.
- 51:41Hey Stan, do we have that one rendering
- 51:43that shows the building at sunset at the
- 51:45entrance?
- 51:46>> Yeah, we actually have [snorts] we did
- 51:49uh daytime and nighttime views for each
- 51:52view.
- 51:54>> Yeah, I think the problem is that that
- 51:56scale we can't see they can't see the
- 51:58details of them.
- 51:59>> Yeah, so in the lights in that in that
- 52:01rendering there like the the windows
- 52:03just like look
- 52:05black.
- 52:06>> Yeah.
- 52:06>> No, I understand.
- 52:08>> Yeah.
- 52:10>> Yep.
- 52:15Yeah, and the color changes are subtle.
- 52:17It doesn't it doesn't render well on
- 52:19this.
- 52:20Um
- 52:20Can you go up one standish?
- 52:23We didn't do virtual renderings of
- 52:24different color patterns, but there is a
- 52:27few different
- 52:29>> So we also think putting putting the
- 52:32project into the context of
- 52:35the neighborhood and the adjoining
- 52:37buildings rather than
- 52:39having it as a standalone we type of
- 52:42>> Yeah.
- 52:43Okay.
- 52:44>> Visual [snorts]
- 52:45with the helpful.
- 52:52>> Well, did you have Yeah, I wanted to
- 52:54hear that tonight. That's going to be a
- 52:56very specific I mean the same is
- 52:58going to be applied to that.
- 53:00The last thing
- 53:07>> I think the light from the building is
- 53:08actually going to help that part of
- 53:11Broadway because on Broadway is so
- 53:13bright but then just right back back
- 53:15actually I mean it's very dark. So
- 53:21being it from that perspective too is
- 53:23only going to show and demonstrate what
- 53:25kind of difference areas with all that
- 53:27additional light.
- 53:36>> Can you go back to the same one
- 53:37standish?
- 53:38>> Actually that's interesting.
- 53:40>> I think
- 53:41>> I mean I don't know what she said she
- 53:42was like
- 53:49>> Yeah,
- 53:50during construction, what's the plan for
- 53:53staging materials?
- 53:55How do you anticipate that will
- 53:59>> Sure, we're going to utilize the
- 54:01parking area to stage materials, and
- 54:03then once the building's up, we'll then
- 54:06focus on building the parking area out.
- 54:08The construction work will also be
- 54:10mostly parking in the municipal lot.
- 54:13>> You also have this open area back here,
- 54:15which before the structure goes up can
- 54:17store materials as well.
- 54:22>> Security, what do you have planned for
- 54:24that?
- 54:25>> Um we have to fence the site in, and we
- 54:27have to We'll have some cameras up,
- 54:29which are There's five of them.
- 54:33We got mobile cameras set up twice, so
- 54:35we're going to have more cameras.
- 54:37>> Okay.
- 54:37>> But we will have a We're going to do a
- 54:39So the plan unless requested still don't
- 54:42have the plan that shows staging.
- 54:44>> I mean, it's kind of easy on this site
- 54:46because it's already cleared.
- 54:48So you know, we we kind of have a
- 54:51nice surface to lay
- 54:52>> Yeah, but you know, I'm sorry cuz you
- 54:53don't
- 54:54>> just use the parking area to lay down
- 54:57yard for the building, and then as the
- 54:58building goes up,
- 55:00um
- 55:01you'll switch over and do the site work
- 55:02when they finish the inside of the
- 55:04building.
- 55:05>> So with most of your activity going on
- 55:07to build board,
- 55:09with construction, unless presuming most
- 55:13of your materials and and the
- 55:15construction activity will get in and
- 55:16out of build board, how are you thinking
- 55:20of any traffic control
- 55:23at Broadway because that's
- 55:25that's a tough
- 55:27exit out there.
- 55:29>> So for traffic signal.
- 55:30>> Normal traffic. I mean, like you're
- 55:32going to have larger vehicles and
- 55:34construction vehicles going in and out.
- 55:37Do you have any thoughts about that?
- 55:40>> We'll work that out. We plan no more
- 55:42than two deliveries a day. So, I don't I
- 55:45don't think it's going to be a huge
- 55:46impact. You can
- 55:48Once the foundation's in place,
- 55:51the the one-way lane going through
- 55:54O'Neil will be open. So, we'll have
- 55:56during construction that can be that can
- 55:58go in either direction. So, we'll have
- 56:00the ability to come in and out of
- 56:02O'Neil.
- 56:05If you know, if there is
- 56:07if there is an occasional long-body
- 56:09truck that has to get in there, it's
- 56:10probably going to want to come on that
- 56:12O'Neil side. We'll have to shuttle
- 56:14things like
- 56:15>> Okay.
- 56:16>> which trucks would would come in on that
- 56:17side of the building. We'll have
- 56:20>> And then we had talked to you about the
- 56:22parking supply and demand reduction
- 56:25strategy. How are things on that?
- 56:27>> We
- 56:28We did with one way in and out.
- 56:30>> Okay.
- 56:31>> One way in is not existing study still
- 56:33in town.
- 56:33>> Okay.
- 56:35>> That side of the solutions.
- 56:39>> The existing community events that
- 56:41happen on Bill Court, including the
- 56:43pickleball,
- 56:44is that going to need something that's
- 56:45going to have to come to a halt for 2
- 56:47years while this is being developed? So,
- 56:49are we putting those pending those
- 56:51programs
- 56:52>> I don't know. I don't
- 56:54>> I know that the heart of
- 56:55>> It's going to be going on the first time
- 56:56because
- 56:57>> part of the in-town happens on Bill
- 56:59Court.
- 57:00And then also the pickleball's becoming
- 57:02more popular.
- 57:03>> Yeah.
- 57:05Yeah, we did want to talk about I think
- 57:07that third entrance tonight on the rear
- 57:09of the field court. And
- 57:12we were wanting to have that community
- 57:14garden entrance, but a safety entrance
- 57:17for snow removal in the winter if you
- 57:19have to plow snow off the site because
- 57:21there isn't a lot of snow load here.
- 57:23And
- 57:25in in case we get a
- 57:27an accident or something that prevents
- 57:30But then with access onto O'Neil, you
- 57:32had a that would certainly go straight
- 57:33through and out of the site. You want
- 57:36You wanted to give that but stone it.
- 57:39We thought I I thought we had discussed
- 57:41that earlier on as soon as that was
- 57:42something important was
- 57:44open to considering whether or not to
- 57:45have it removed, but
- 57:48um it's a it's important from a
- 57:50pedestrian access standpoint.
- 57:51>> But I think
- 57:52>> Yeah.
- 57:52>> along with otherwise we literally have
- 57:54one-way traffic through the site. So
- 57:56when they only have access there,
- 57:58it's the same as I mean it would be the
- 57:59best if you could put some type of a uh
- 58:02you know, a gate with a bar that raises
- 58:04um so that if we need to have um
- 58:06residents from O'Neal exit the site, and
- 58:08then we would be allowed
- 58:09out of O'Neal and get out the field
- 58:11court as well. And then also, as Keith
- 58:12noted,
- 58:13it assists us in snow removal and so
- 58:20As far as the parking lot statement, um
- 58:23would the board like to see any like a
- 58:27stone wall
- 58:29along the court face or court face along
- 58:30the green sections? So
- 58:33we could do a stone wall that maybe we
- 58:35could build up like a 30-in wall with
- 58:37stone face and make half of it be going
- 58:39to be stable as sitting bench as well as
- 58:42a
- 58:42>> I was saying in in in terms of combining
- 58:45that with the activities that generally
- 58:47take place there where the general
- 58:49public, it might be nice to maybe
- 58:51incorporate a
- 58:52you know, a combination of seating
- 58:54element with your landscaping
- 58:58uh requirement to
- 59:00you know,
- 59:00>> What sort of what would you see along
- 59:03here? Cuz we we were thinking about
- 59:04doing
- 59:06like where these green spaces are
- 59:08uh here, here, and here
- 59:12doing a like a poured concrete wall with
- 59:14stone veneer half and it would be like a
- 59:17sitting bench.
- 59:18>> So it would be it would be great if you
- 59:19>> kind of acts as a a visual break and
- 59:22that it meets the
- 59:24desire of the code,
- 59:26but it's also very functional. People
- 59:27would there that can actually just sit
- 59:29on it, especially for pickleball.
- 59:32>> Yeah.
- 59:34>> You could also have like a a trash
- 59:35receptacle cuz if people are there
- 59:37playing, they'll ultimately have
- 59:39something to throw away. It's not a
- 59:41handy way for you to just have a meeting
- 59:43Skype when you're going to have a
- 59:44meeting.
- 59:45>> And were um some comments
- 59:48>> Do they need to put that waiver?
- 59:51>> Yeah.
- 59:51>> Okay.
- 59:51>> Yeah.
- 59:52>> Yeah. Yeah.
- 59:53>> So, there were some comments received
- 59:55from the CAC
- 59:56>> as well.
- 59:57>> that.
- 59:57>> You saw those as well. So, we're going
- 59:59to need to have them address those
- 1:00:01>> Yeah.
- 1:00:02>> um in your final response for for the
- 1:00:04November meeting.
- 1:00:05>> Okay.
- 1:00:06>> Um I
- 1:00:07>> What one of the other waivers found was
- 1:00:08the
- 1:00:09the setback from the parking from the
- 1:00:10property line?
- 1:00:112 ft versus 5 ft.
- 1:00:13Um that is a waiver we'd be seeking
- 1:00:15because I think it allows us an extra 1
- 1:00:182 3 4 parking spaces.
- 1:00:20>> Mhm.
- 1:00:21>> And there's already a shortage of
- 1:00:22parking in the city on the site. So, um
- 1:00:25it's a it's a small waiver request 2 ft
- 1:00:27to 5 ft plus I think the addition of
- 1:00:30this um landscape wall will provide a
- 1:00:33nice separation between the parking lot
- 1:00:36um and field court, which will add to
- 1:00:38the I think board's consideration of
- 1:00:40that waiver.
- 1:00:42>> Mhm.
- 1:00:45>> We spoke with the landscape architect
- 1:00:47studio.
- 1:00:48We worked with the urban forestry.
- 1:00:51They're they're good on that on that.
- 1:00:53>> Right.
- 1:00:54>> Yes.
- 1:00:54>> We got an understanding of the salt for
- 1:00:56W.
- 1:00:56>> Yes, at least we're dealing with crane.
- 1:00:59>> Yeah.
- 1:00:59>> Um final plan.
- 1:01:00>> Yeah.
- 1:01:01And the third the third waiver I think
- 1:01:03was the elevation difference between the
- 1:01:05first floor I mean
- 1:01:06>> and the grade, yeah.
- 1:01:07>> and the grade.
- 1:01:08>> I accept that.
- 1:01:09>> Okay. So, yeah, yeah, we discussed that,
- 1:01:11but just from an ADA entrance
- 1:01:12compliance, we had to submit a new plan.
- 1:01:21>> So, I guess you do want us to continue
- 1:01:22to proceed with the extra curb cut and
- 1:01:25fill with
- 1:01:29the extra curb cut will remain but will
- 1:01:30have a gate for emergency access
- 1:01:32assessment right.
- 1:01:35How does the board feel about that?
- 1:01:37Well,
- 1:01:38their sales enable you to refer to the
- 1:01:39second curb cut. Yes. Yeah.
- 1:01:42Yes.
- 1:01:45Yeah.
- 1:01:46I think they made it a lot easier just
- 1:01:49and still change access. Yeah.
- 1:01:51I think it's the best of all worlds.
- 1:01:54I agree.
- 1:01:56Okay.
- 1:02:02Does the board have any other questions?
- 1:02:14I sent him an email today reminding him
- 1:02:17that we are looking for names for the
- 1:02:19balance. So hopefully
- 1:02:21I will keep pushing him.
- 1:02:24But yeah. I said about keeping it beyond
- 1:02:27the meeting with the department head
- 1:02:29essentially will get you
- 1:02:30drawings and DPW's approval and
- 1:02:33everything. So you've gotten their
- 1:02:35feedback
- 1:02:36preliminarily
- 1:02:42Board of any other comments?
- 1:02:44What?
- 1:02:47Okay. So you think being
- 1:02:49in about your marching orders? We
- 1:02:51leaving the public hearing open
- 1:02:55sorry. Are we leaving the public hearing
- 1:02:56open?
- 1:03:00But do you mean like to leave the public
- 1:03:01hearing open or do you want to close it?
- 1:03:04I would leave it open
- 1:03:06okay. I would leave it open for now.
- 1:03:08Okay.
- 1:03:12>> [clears throat]
- 1:03:13>> So are you able to end?
- 1:03:17What do you want to say at this point?
- 1:03:27motion
- 1:03:29>> Wait, motion to table this and keep the
- 1:03:31public hearing open until next month.
- 1:03:33Andrew, is motion second? Kyra?
- 1:03:37All in favor?
- 1:03:39Opposed?
- 1:03:41Okay.
- 1:03:43>> Mark is absent.
- 1:03:48>> It is at the time of the excelsior.
- 1:03:51>> Okay.
- 1:03:52All right. Thank you.
- 1:03:54Thank you.
- 1:04:04Maybe I can do that.
- 1:04:06Thank you so much.
- 1:04:07>> And
- 1:04:08let the record show that Sage Nukirk has
- 1:04:11arrived and will be participating.
- 1:04:16>> Go back again.
- 1:04:19Did they win? They won. One to zero.
- 1:04:22I'm not signing this one, right?
- 1:04:24>> Correct.
- 1:04:43>> Number eight.
- 1:04:45>> Number eight.
- 1:04:57Okay, item number eight. 350 Broadway,
- 1:04:59site plan to construct an addition to an
- 1:05:01existing building and establish 10
- 1:05:03residential units.
- 1:05:05SBL 56.26.11-49.100.
- 1:05:10Secret determination soon.
- 1:05:12So, this
- 1:05:13>> This one is, I think, entry.
- 1:05:17>> Try it too.
- 1:05:18Uh transex zone T5, the applicant has
- 1:05:21ward nine. Diane Chen is the applicant.
- 1:05:24350 Broadway Kingston LLC owner.
- 1:05:28Welcome.
- 1:05:29Are you going to just names for the
- 1:05:31record, please?
- 1:05:31>> Good evening. Diane Chen. This is
- 1:05:35This is Mike Shilo, my GC, Odyssey
- 1:05:38Builder. So, I'm going to turn it over
- 1:05:40to him. He knows what to do. Thank you.
- 1:05:42>> [laughter]
- 1:05:43>> Well, if you just want to give us a
- 1:05:44quick walk through. Sure.
- 1:05:46>> will have the screen, so.
- 1:05:48>> You guys are probably familiar with the
- 1:05:50property because it's been on the
- 1:05:51planning board previously with a grant
- 1:05:53on seven units.
- 1:05:55When Diane bought the property, it was
- 1:05:57showing seven units, but it would never
- 1:05:59qualify for
- 1:06:01a building permit because the two
- 1:06:03adjacent lots, even though they're
- 1:06:05lower, didn't allow proper fire egress
- 1:06:08because there was no way they had
- 1:06:09multiple bedrooms.
- 1:06:11During this process, we discovered that
- 1:06:13the second and third floor roofs are in
- 1:06:15total need of replacement, and we talked
- 1:06:18to our local architect, Robert Sweeney,
- 1:06:20and looked at the feasibility of of just
- 1:06:22removing down to the second floor and
- 1:06:24going back up over the existing
- 1:06:26footprint and enclosing the entire
- 1:06:28footprint.
- 1:06:29To make the building code compliant, we
- 1:06:31could only fit studios like we need
- 1:06:33eight one-bedrooms in there that would
- 1:06:34be closed off, and we wouldn't be fire
- 1:06:36code. So, we figured out that we can
- 1:06:38keep the same bedroom count, but we get
- 1:06:4010 units versus the seven that were
- 1:06:42originally planned.
- 1:06:44Mhm.
- 1:06:46Project has three affordable units as
- 1:06:49part of the scope. Um
- 1:06:52we will be looking for a handicap spot
- 1:06:54on the street because when our 10
- 1:06:56originally property was being marketed
- 1:06:59with gated parking in the rear, it
- 1:07:01turned out that the spots weren't gated
- 1:07:03after all of the property, so
- 1:07:05the originally planned handicap parking
- 1:07:07in the back is not feasible anymore. So,
- 1:07:09we either would like to do right in
- 1:07:11front of the property or
- 1:07:13paint and stripe one of the closest
- 1:07:14street in with the city lot if the city
- 1:07:16would be able to do it for the one or
- 1:07:17the other if the city would do it to us.
- 1:07:19In the rear of the property, we are
- 1:07:21going to have access for a full garbage
- 1:07:23container as well as a closed bicycle
- 1:07:26enclosures so that we can fit probably
- 1:07:29one bike for most of the tenants even
- 1:07:31though we're only required to have two,
- 1:07:32we're making it available for
- 1:07:33everybody's use.
- 1:07:35And we're not changing footprint of the
- 1:07:37property at all.
- 1:07:39That's rear of the property. So,
- 1:07:41Broadway facing side will still look the
- 1:07:43same and actually look better cuz it'll
- 1:07:44have windows finally. And probably the
- 1:07:46same thing too.
- 1:07:47I'll answer any questions the board has.
- 1:07:49>> So, you mentioned about the back of the
- 1:07:51property with the
- 1:07:53>> [clears throat]
- 1:07:53>> trash receptacles and all of that. So,
- 1:07:56the last time I was here there was an
- 1:07:58easement [clears throat]
- 1:07:59to access
- 1:08:01>> The easement does not exist. They never
- 1:08:03registered it when the hospital The
- 1:08:04original Since the hospital sold the
- 1:08:06property or the easement, the previous
- 1:08:08owner never got that documented on the
- 1:08:12deed. And unfortunately, it didn't
- 1:08:13transfer to us. It's not mapped there.
- 1:08:16Worst case scenario, if and when the
- 1:08:18hospital decides to do something with
- 1:08:20that lot, we can take the garbage that
- 1:08:22we have there and walk it through our
- 1:08:23ground floor corridor and and put it out
- 1:08:25front where our garbage dumpster comes.
- 1:08:27So, right now we'll have an enclosure
- 1:08:29which can store a 4-yard container which
- 1:08:32the dumpster company can come in and
- 1:08:33open the gates, pull it out, dump it,
- 1:08:36put it back in. And close up the And
- 1:08:39it's not visible. We do have a small
- 1:08:40section in the back which we're going to
- 1:08:42make still keep retain the originally
- 1:08:45planned steps. And there will still be
- 1:08:47an access point on the back of the
- 1:08:49property so that you in essence can walk
- 1:08:51through to the front and that's our main
- 1:08:53ADA compatible.
- 1:08:55>> Okay.
- 1:08:56>> We also plan on marketing the two ground
- 1:08:58floor apartments as ADA. We're required
- 1:09:00to have one but we're making both ADA
- 1:09:02accessible.
- 1:09:04>> Okay.
- 1:09:08Now, this is the change of the facade on
- 1:09:10the front of the building first floor.
- 1:09:13>> This is the existing.
- 1:09:15>> Okay.
- 1:09:15>> It's going to be all We're not changing
- 1:09:17anything on the facade on the front
- 1:09:18floor. There's an existing roofing
- 1:09:19canopy. We're just going to re-roof it
- 1:09:21cuz it's
- 1:09:22>> Okay.
- 1:09:22>> in not in good shape. So, this is the
- 1:09:24rear of the property and it had stucco
- 1:09:27and siding and had a mishmash of
- 1:09:28different things. So, we're going to use
- 1:09:30a Hardie Plank 9-in white standard look.
- 1:09:33The bottom We changed it's masonry on
- 1:09:35this side. The masonry goes up and over
- 1:09:37here it's a wood structure to the top.
- 1:09:39>> But, you you were going to enclose that
- 1:09:42front
- 1:09:42>> Where?
- 1:09:43>> little alcove?
- 1:09:44>> Yes. Oh my god. I Sorry, I totally
- 1:09:46forgot about that. So, right now we have
- 1:09:47a homeless person that likes to use our
- 1:09:49spot. And what we decided to do is bring
- 1:09:52that
- 1:09:53space towards the street more. We'll
- 1:09:55probably leave it within a foot of its
- 1:09:58of the property line. So, that we can
- 1:10:00still keep the We'll call box for the
- 1:10:02fire departments and have their access
- 1:10:04to it, but it would also serve as a wind
- 1:10:06entry for the retail when we rent it
- 1:10:08out.
- 1:10:08>> Amen.
- 1:10:09>> And eliminate the homeless person
- 1:10:10sleeping there.
- 1:10:12>> And then with
- 1:10:13um mailboxes?
- 1:10:14>> Mailboxes, right now we have two
- 1:10:16options. One is right here on the sliver
- 1:10:19just a built-in. We might make the wall
- 1:10:21wider or right now it's programmed you
- 1:10:23walk into the corridor and there'll be
- 1:10:2510 mailboxes plus a commercial for the
- 1:10:27mail departments use in this instance.
- 1:10:30We set inside the wall.
- 1:10:31>> Okay. That would be inside the left
- 1:10:33>> Inside the left door, yes.
- 1:10:34>> Okay.
- 1:10:35>> Secondary door there. So, the mailman
- 1:10:36can get in, but he can't go beyond the
- 1:10:38problem.
- 1:10:38>> Okay.
- 1:10:39>> Um so, you go to your plan to make sure
- 1:10:40there
- 1:10:41>> And the first floor apartments, their
- 1:10:43access
- 1:10:44You go behind?
- 1:10:45>> No, you actually have entrances from the
- 1:10:46front. If you go to the plan
- 1:10:49the section that has
- 1:10:51So, you would walk in here
- 1:10:53>> Okay.
- 1:10:54>> and you have a corridor here to this
- 1:10:55unit and you can go to this one. But,
- 1:10:58they also have access from the rear if
- 1:11:00they want to.
- 1:11:08Because we couldn't bank on having this
- 1:11:10always available for handicap entry, we
- 1:11:13originally were programmed to have a
- 1:11:14lift there. We have to lose access to
- 1:11:16that, we have to maintain this corridor,
- 1:11:18and we have to sacrifice some of this
- 1:11:20space, which originally was part of the
- 1:11:22retail. But, by doing so, we've
- 1:11:24maintained access and also here is the
- 1:11:26>> And it's just one retail?
- 1:11:28>> One retail.
- 1:11:29>> Okay.
- 1:11:30>> Existing.
- 1:11:32750-ish square feet.
- 1:11:42>> Now, another question. Since this takes
- 1:11:45up most of the footprint, and there is
- 1:11:47no easement in the back, how will
- 1:11:49construction stage with materials and
- 1:11:52equipment and
- 1:11:54>> I can bring everything in through here
- 1:11:55or boom it in.
- 1:11:57>> Okay.
- 1:11:57>> We do have
- 1:11:58>> like machines, booms to bring
- 1:12:01>> Well, I did I would have a delivery of
- 1:12:02drywall, that's our biggest item really
- 1:12:04to come in, and and some 2x4s, so we can
- 1:12:06stage it right through the windows.
- 1:12:08Um, I'm led to believe with initial
- 1:12:10conversations that the hospital would
- 1:12:12allow us to take deliveries from the
- 1:12:14back, and wouldn't impact this.
- 1:12:16If we have to go to the front, we'll
- 1:12:17apply for a permit to park,
- 1:12:20load it, and then leave.
- 1:12:21>> Okay.
- 1:12:22>> With flaggers.
- 1:12:31>> Right now, the parking lot, every time I
- 1:12:33go, it's really empty.
- 1:12:35They have been doing work on that there,
- 1:12:36so hopefully
- 1:12:38>> They'll probably stage that area when we
- 1:12:39start.
- 1:12:40>> And then we won't bother anybody too.
- 1:12:42Hopefully they complete it fairly soon.
- 1:12:48What's your timeline?
- 1:12:50>> Assuming this gets going in the right
- 1:12:52direction, we would apply for permits
- 1:12:55next week for the first phase that's
- 1:12:56already permitted, which is the
- 1:12:58downstairs.
- 1:12:59We're finalizing drawings with Charlie
- 1:13:01and hope to have something ready for
- 1:13:03There's an existing building right now
- 1:13:04that we're going to be filing for demo
- 1:13:06and we want to do the roof
- 1:13:08sooner than later. So, if it's not
- 1:13:09raining it's worse.
- 1:13:11>> We're really hoping that's
- 1:13:13late spring this year.
- 1:13:14>> Be on the market soon. Yeah.
- 1:13:18>> But, because I'm in the commercial we
- 1:13:20keep
- 1:13:21interior material business anyway, so
- 1:13:24that becomes very easy. Once I have the
- 1:13:26roof and the windows, inside it will go
- 1:13:29really fast.
- 1:13:30>> Okay.
- 1:13:36>> Any questions?
- 1:13:37>> We're going to go over it now.
- 1:13:41>> And then, I think it's great. I mean,
- 1:13:43that you don't really see a lot of
- 1:13:45proposals for studios and the fact that
- 1:13:48you can get more housing out of it for
- 1:13:50people. Which
- 1:13:51is great.
- 1:13:52>> Lemonade out of lemons. Yeah. Yeah.
- 1:13:54>> That's our architect, Charlie Wesley.
- 1:13:57He's a native Kingston. He said this
- 1:13:59will be so good for the area.
- 1:14:01Great location for a And it will be nice
- 1:14:03to see that
- 1:14:04>> [laughter]
- 1:14:05>> Everybody's looking forward to it.
- 1:14:07>> coming to Is that vacant?
- 1:14:09Finally.
- 1:14:11>> See you then.
- 1:14:11>> Everybody can't wait. Yeah, yeah. Thank
- 1:14:13you.
- 1:14:15>> All right. So,
- 1:14:17>> Thank you so much.
- 1:14:19>> All right. So, this is a type two. We
- 1:14:22have the
- 1:14:22>> And
- 1:14:23is
- 1:14:24Do you
- 1:14:25do require because it's 10 units, you
- 1:14:29are required to have one unit dedicated
- 1:14:32affordable with three
- 1:14:33>> We have three.
- 1:14:35>> You'll have to have one deed restricted
- 1:14:36through a covenant. And then, there will
- 1:14:39be a wreck fee of $10,000.
- 1:14:42And we just recognized potential
- 1:14:45easement in the future and then the
- 1:14:47fourth policies four or ending 6 7 11
- 1:14:5112 16 16A 17 20 21 22 23 and 24.
- 1:14:58Which you will get.
- 1:14:59>> [laughter]
- 1:15:00>> Perfect.
- 1:15:01>> Can you get them?
- 1:15:01>> [clears throat]
- 1:15:02>> How much you said the rent for unit 9
- 1:15:03that's
- 1:15:04>> 11
- 1:15:05>> $9,000 for the rent for unit
- 1:15:06>> 9,000 well
- 1:15:08Yeah, the with 10 units the first six
- 1:15:10are exempt for the and then because they
- 1:15:13are the affordable units for you and six
- 1:15:15units is all
- 1:15:16>> Mhm.
- 1:15:18>> What about taking the other two
- 1:15:19affordable that we're putting into
- 1:15:21consideration?
- 1:15:22>> Mhm.
- 1:15:25>> Take those into account and take those
- 1:15:27are deed restricted, right?
- 1:15:28>> Yes.
- 1:15:28>> Okay.
- 1:15:29>> If they're deed restricted then that one
- 1:15:31>> They are.
- 1:15:32>> If you spread it over they have to be
- 1:15:34deed restricted basically in perpetuity
- 1:15:37for as long as the use remains
- 1:15:40residentially
- 1:15:42occupied.
- 1:15:43>> I think that's your situation.
- 1:15:44>> I can't really adjust it but yeah.
- 1:15:48>> All right, so motion next.
- 1:15:50>> I need a motion.
- 1:15:51>> I'll make a motion.
- 1:15:52>> Can I get a second?
- 1:15:54Sage
- 1:15:56All in favor?
- 1:15:58Opposed?
- 1:16:01Thank you folks. Really appreciate it.
- 1:16:04Look forward to
- 1:16:06receiving the homework.
- 1:16:11Have a great evening.
- 1:16:14>> I'll find the deputy director.
- 1:16:17>> Yeah, we'll we'll send you a my letter.
- 1:16:19>> Do you have any homework
- 1:16:20>> Are you kidding?
- 1:16:21>> I can't even imagine.
- 1:16:22>> What do you
- 1:16:23>> I don't know what that is.
- 1:16:24>> I have a question about
- 1:16:27>> Who says it's a good thing?
- 1:16:28>> I don't know what she what's saying.
- 1:16:30>> So this happened in just one
- 1:16:32>> I was I was waiting to
- 1:16:33>> I don't know what to
- 1:16:34>> I was saying that
- 1:16:34>> I don't know what she was saying to me.
- 1:16:37>> You can do a good job.
- 1:16:40>> Stop it.
- 1:16:42>> I guess that's it.
- 1:16:43>> What did you say?
- 1:17:04>> Okay, item number nine, 11 111 Schwenk
- 1:17:08Drive site plan with associated waivers
- 1:17:11to demolish the existing building and
- 1:17:13construct a mixed-use building with
- 1:17:15ground floor commercial and residential
- 1:17:17above. SBL 48.314-2-
- 1:17:2223.1 secret determination that's two
- 1:17:27transact zone T5 MS ward two Ross
- 1:17:32Hoffman milestone development applicant
- 1:17:35CMRC LLC owner.
- 1:17:39Move forward folks.
- 1:17:53>> [laughter]
- 1:18:28>> Well, welcome folks and if we could just
- 1:18:29have everyone's name for the record.
- 1:18:31>> Yeah, absolutely. Thank you so much for
- 1:18:32having us.
- 1:18:33I'm Marley Bushen. I'm a partner and
- 1:18:35head of development at Milestones.
- 1:18:39Uh this is Martha Bush
- 1:18:41>> I'm a director at Marble. We have a
- 1:18:43construction project.
- 1:18:44>> And now he will also be joining us.
- 1:18:46Scott James.
- 1:18:47>> He's an associate at Marble.
- 1:18:49>> Uh
- 1:18:49we've got Mike Moriello who's doing our
- 1:18:51land use.
- 1:18:53Uh
- 1:18:53Paul Arias who's our civil.
- 1:18:56Kevin O'Connor from Rock Coast, partners
- 1:18:58on the project. Uh and a smattering of
- 1:19:01other people heart and Tim also from
- 1:19:03Rock Coast, my business partner and
- 1:19:05>> And
- 1:19:05>> Um and Samara and Eloise, Mary Daley and
- 1:19:08Eloise Paul from Sycamore Street
- 1:19:09Advisors who are also on the project.
- 1:19:12>> Thanks, Samara. Well, welcome, folks.
- 1:19:15Um
- 1:19:15this point you just want to give us a
- 1:19:18walk through?
- 1:19:18>> Yeah, absolutely. Um so, I think many of
- 1:19:21you know the site as the Kia site.
- 1:19:25>> [laughter]
- 1:19:26>> Uh we'd love for it to be rebranded as
- 1:19:27something else. I have but uh we're
- 1:19:30really excited about this project. We
- 1:19:32are proposing 135 units of all
- 1:19:35affordable housing. Um
- 1:19:38we are working with HCR on the financing
- 1:19:40for this. So, we're doing it as a bond
- 1:19:42and credit deal. So, that will ensure
- 1:19:44that it is 100% affordable. We're
- 1:19:47targeting AMIs between 40%
- 1:19:51Um and we are hoping to close on this
- 1:19:55about a year from now on financing. Um
- 1:19:59assuming that approvals and everything
- 1:20:00go well, okay. Uh we are including
- 1:20:04studios to three-bedroom units.
- 1:20:06Um
- 1:20:07and uh as you can see, the building is
- 1:20:11sort of L-shaped and it's got a small
- 1:20:13amount of ground floor retail to comply
- 1:20:15with the zoning on the C5 Main Street.
- 1:20:17Um and we're also currently proposing
- 1:20:20doing the project uh as mass timber uh
- 1:20:23as sort of a sustainable building
- 1:20:25method. We have uh geothermal heating
- 1:20:28and cooling uh that we're designing into
- 1:20:30the project. and um
- 1:20:33yeah, we uh
- 1:20:34have
- 1:20:35over 100 spaces of surface parking
- 1:20:38beside this by far it is about 2 acres,
- 1:20:40so we're able to accommodate that and we
- 1:20:42think that that will be more than enough
- 1:20:44for the uh population in the building.
- 1:20:47Um and I will turn it over to the
- 1:20:50architects who will take us through more
- 1:20:52of the specifics. Yeah.
- 1:20:53>> If there's any questions about 519, I'll
- 1:20:55be able to explain them.
- 1:20:58Um I think we're just getting them
- 1:21:00Yeah, the graphics up.
- 1:21:10full screen.
- 1:21:16We got
- 1:21:17We got the server
- 1:21:18How do you like those yet?
- 1:21:25And then change
- 1:21:33Well, this is the aspect of speaking.
- 1:21:36All of this is
- 1:21:37still
- 1:21:54So, what we're doing is this is the um
- 1:21:57all of that on the site plan, but
- 1:21:59there's going to be a small lot line
- 1:22:02revision associated with this because
- 1:22:05there's a piece in the rear that they're
- 1:22:07going to need
- 1:22:08um
- 1:22:09assuming ownership of the adjoining
- 1:22:12property to the land.
- 1:22:14>> I'm going to guess they're off the rear.
- 1:22:16>> Back here on the site, there's that odd
- 1:22:19sort of triangle uh that cuts in versus
- 1:22:21to the 111 straight site, and so we um
- 1:22:26have an agreement with um
- 1:22:28um Bob Ryan
- 1:22:30uh, who owns the property and I started
- 1:22:32to acquire that site in conjunction with
- 1:22:34our closing. And you can actually see
- 1:22:36the triangle sort of highlighted on the
- 1:22:37bubble. You have a small computer.
- 1:22:40>> So, uh, project highlights which Marley
- 1:22:43just ran through. This mentions 100%
- 1:22:46portable 150 by units,
- 1:22:48hybrid CLT construction cross-laminated
- 1:22:50timber, uh, geothermal heating and
- 1:22:53cooling.
- 1:22:54Um, also some interesting stuff at the
- 1:22:56site. We're actually flood wings. We're
- 1:22:57doing flood resiliency to buildings.
- 1:22:59It's actually 5 ft above the ground
- 1:23:02plane. So, we're going with that.
- 1:23:04Um, and we're providing approximately
- 1:23:06102 parking spaces. So,
- 1:23:09real quickly, I'll go over some context
- 1:23:11and design and then get into the
- 1:23:12building. So, this is where Branch
- 1:23:14Schwenk is uh, located. So, this is the
- 1:23:16site with that lot line adjustment
- 1:23:18shown. So, we're just outside of the
- 1:23:20historic district here on the other side
- 1:23:22of the hill.
- 1:23:23Um, and here there's the single, uh,
- 1:23:26old, uh, car lot there with
- 1:23:29asphalt around it. So, when we got into
- 1:23:32the design, we were really taken,
- 1:23:34obviously, with the Stockade District
- 1:23:35and with Front Street and Wall Street
- 1:23:37and kind of looking at the qualities of
- 1:23:39the buildings there
- 1:23:41um, and contrasting that with Schwenk
- 1:23:43Drive. So, we went through and we did a
- 1:23:44whole inclusive looking at the rhythms
- 1:23:46and the proportions of those facades and
- 1:23:48trying to understand what makes those
- 1:23:50buildings have so much character.
- 1:23:52And then we looked at Schwenk Drive
- 1:23:54which has
- 1:23:55a quite different typology of suburban
- 1:23:57buildings and a parking lot, right? So,
- 1:23:58kind of the big question for us is how
- 1:24:00we bring that character down there on
- 1:24:03the river here.
- 1:24:04Um, and so, this is some photos of the
- 1:24:06site if you don't know it that well. Uh,
- 1:24:08so, this is the building on the
- 1:24:10backside. Here you have all these
- 1:24:12building these trees that are going up
- 1:24:13the hill kind of screen the parking lot
- 1:24:15a little bit. And there's existing
- 1:24:17foliage on either side of the building
- 1:24:19as well.
- 1:24:20Um,
- 1:24:21so, we're really taken with the textures
- 1:24:23of the town, right? All the different
- 1:24:24history and all the details that make up
- 1:24:27the buildings and particularly the
- 1:24:29adjacent Stockade Historic Area. And we
- 1:24:31did a whole analysis looking at the
- 1:24:33wealth and material history that comes
- 1:24:34from Kingston and the greater Ulster
- 1:24:36County. So, we looked at brick, we
- 1:24:38looked at timber, we looked at bluestone
- 1:24:41and limestone masonry, we looked at
- 1:24:42cement.
- 1:24:44And then we, you know, went back to the
- 1:24:45site
- 1:24:47and we looked at actually the building
- 1:24:48history of the Stockade District and
- 1:24:51what the buildings were made out of,
- 1:24:53largely brick frame siding and concrete
- 1:24:55and how that changed over time.
- 1:24:57So, then when we went to the site, we
- 1:24:59took two what we call bars
- 1:25:02and we treated one with brick and
- 1:25:03another with a limestone or stone like
- 1:25:05material using a high-density panel
- 1:25:08which has a texture to it, it's like a
- 1:25:10furred material.
- 1:25:12So, we defined those volumes, we
- 1:25:14articulated the volumes a little bit
- 1:25:15differently. The brick one has this
- 1:25:17stepping on the front to follow the
- 1:25:18curve of the street corner. As that's
- 1:25:20what we always said, but don't show me
- 1:25:22the whole thing. We connected them with
- 1:25:24this bridge across. And then finally we
- 1:25:27articulated the volumes by adding some
- 1:25:29more wood into the the building and
- 1:25:32those kind of that happen at public
- 1:25:33spaces within the building and then we
- 1:25:36lifted the back portion of the building
- 1:25:38up so that we get all the parking
- 1:25:40underneath it in the front.
- 1:25:42So, that gives us two facade systems for
- 1:25:45the building. They're both
- 1:25:47a rain screen insulation system, but on
- 1:25:49the front it's a a brick facade, it's a
- 1:25:52Kingston brick so it's a bit longer and
- 1:25:54taller.
- 1:25:56And then on the back is that
- 1:25:58high-density panel that we talked about.
- 1:26:00So, the brick will have headers and
- 1:26:02sills
- 1:26:04and then the
- 1:26:06panel portion will have some trim around
- 1:26:09the windows to help cast shadows and
- 1:26:10break up the facade as well.
- 1:26:13So, we mentioned that it was hybrid CLT.
- 1:26:16What that means is that the floors and
- 1:26:18then out of cross-laminated timber.
- 1:26:20Um so, because of the flood plane here,
- 1:26:23we're building that first floor out of
- 1:26:24concrete. So, it's resilient. So, it's a
- 1:26:26concrete podium.
- 1:26:28Um so, above that, but you have See
- 1:26:30these orange lines here? That will be
- 1:26:33cross-laminated timber flooring, which
- 1:26:34will be exposed in the apartment. So,
- 1:26:36this is a similar style project, but you
- 1:26:38can see the wood ceilings there. And
- 1:26:41then the walls themselves will be
- 1:26:43uh light wood framing. So, those are
- 1:26:46spaced on a 12 by 6 module,
- 1:26:48um which act as bearing and shear walls
- 1:26:50throughout.
- 1:26:51Uh and then also above the first floor,
- 1:26:54that CLT is going to be making up the
- 1:26:57elevator shafts and the stair shafts.
- 1:26:59So, when you're in a corridor, you can
- 1:27:00see where the public spaces are, and
- 1:27:02they can move by seeing the wood.
- 1:27:06Uh so, this is a view from the
- 1:27:07northwest, um which was on one of the
- 1:27:09earlier slides. This is the retail
- 1:27:11component uh that Marylin mentioned.
- 1:27:14This is the kind of burning the sloping
- 1:27:16that we're using to navigate that 5-ft
- 1:27:19difference. So, we're using the
- 1:27:20landscape and we use it as notches, like
- 1:27:22a harsh wall in front of the building's
- 1:27:24wall. Well,
- 1:27:25this is a view from the southwest. If
- 1:27:27you go in the parking lot, so if you
- 1:27:29look at it
- 1:27:31that way. And then this is the screening
- 1:27:33and the rear entrance into that amenity
- 1:27:35courtyard
- 1:27:37um that was mentioned, and you can start
- 1:27:38to see some of the amenity rooftop
- 1:27:40terraces above.
- 1:27:43And then looking at the northeast, you
- 1:27:44can see the drive aisle. So, that takes
- 1:27:46you back into the parking. There's 102
- 1:27:47spaces. And then here you get a kind of
- 1:27:49clear view of the residential entrance.
- 1:27:51So, again, anywhere where there's kind
- 1:27:53of public movement, that's where we
- 1:27:55start to bring in the wood and bring it
- 1:27:56in from the outside.
- 1:27:58Um and then here you see the stepping of
- 1:27:59the building itself. It's stepping 2 and
- 1:28:011/2 in 2 and 1/2 foot increments. And
- 1:28:04so, that brings down the natural canopy,
- 1:28:06so that we don't need to add anything
- 1:28:08else on to the facade.
- 1:28:11And then this is a view from the
- 1:28:13courtyard. That initial early sketch we
- 1:28:15did, but gives you an idea of the
- 1:28:17amenity spaces that will be wrapping
- 1:28:19this courtyard. So you'll have your
- 1:28:20lounge off of it. Uh you'll have your
- 1:28:22laundry and your gym. Um and then you
- 1:28:25can kind of see some of the CLT coming
- 1:28:27through the windows up there.
- 1:28:30Uh this is a ground floor plan zoomed in
- 1:28:33on the first floor of the building
- 1:28:35itself. So this is the courtyard
- 1:28:37that we were just looking at. You have
- 1:28:38your amenity spaces wrapping it with
- 1:28:40this corridor so that there's always
- 1:28:41natural light coming into that. Um and
- 1:28:44then you have your main entrance here in
- 1:28:46the north, which is what we looked at
- 1:28:47with the ramp, the stairs, the retail,
- 1:28:49and the residential entrance are on the
- 1:28:51same level. So they're both at that 5-ft
- 1:28:54uh elevation. And then there is a rear
- 1:28:56entrance from the parking area that has
- 1:28:59both a ramp and stairs as well.
- 1:29:02Um on the ground floor we also have like
- 1:29:04our water meter, electrical service room
- 1:29:06up here in the corner. We have a
- 1:29:08compactor room um which will carry 30
- 1:29:11toters, which will be brought out and
- 1:29:12staged in the back. Uh we're working
- 1:29:15with our waste management on that.
- 1:29:18And then the typical floor, these will
- 1:29:20run through two through six. Um so these
- 1:29:22have the studios, the one beds, the two
- 1:29:24beds, and the three beds.
- 1:29:26Uh this repeats per the floor or per
- 1:29:29every floor. So there's an elevator bank
- 1:29:30here in the north. You have your stair
- 1:29:32here in the north and another stair in
- 1:29:33the south. So those run
- 1:29:36back
- 1:29:38down.
- 1:29:39So that stair A goes out and exits
- 1:29:41through there and stair B connects it
- 1:29:42out here. And stair B actually exits out
- 1:29:45above the flood plane,
- 1:29:48um which is just kind of a
- 1:29:50you know, in case there is a flood, that
- 1:29:52way you're not opening the flood right
- 1:29:54out of the water.
- 1:29:57And then on the roof we have an amenity
- 1:29:59terrace in the bar portion in the center
- 1:30:01there.
- 1:30:02Uh and then we have the stairs on either
- 1:30:04side.
- 1:30:05Because we're using a geothermal system,
- 1:30:08we don't actually have that much
- 1:30:09equipment on the roof. So, we have two
- 1:30:11ERVs in the north and two ERVs in the
- 1:30:13south. And then there's a a generator
- 1:30:16that will be on the north on the strong
- 1:30:18rise.
- 1:30:21So, as part of this, we are going for
- 1:30:24seven
- 1:30:25waivers. Three of them are major and
- 1:30:28four minor. The first one
- 1:30:32is the built-to zone. So, as of right
- 1:30:35with the affordability bonus, we can
- 1:30:37build up to six stories. Uh for the
- 1:30:39first 80 ft. So, that's essentially
- 1:30:41roughly this far in the broad up to six
- 1:30:45stories.
- 1:30:46Uh what we're looking to do is to
- 1:30:48continue that across so that we get more
- 1:30:51affordable units here in the back seven.
- 1:30:53Um the second major waiver is a distance
- 1:30:57between glazing. So, per zoning, I'll
- 1:31:00jump back to that beautiful
- 1:31:03Per zoning, this portion of the facade
- 1:31:05needs to be 2 ft wide. Uh we're showing
- 1:31:08it as four to keep a proportional rhythm
- 1:31:10with the rest of the building.
- 1:31:11Um and also to account for the
- 1:31:13structural column that's coming down
- 1:31:14there.
- 1:31:18The
- 1:31:19third major waiver is
- 1:31:21curb cut width. Uh per the zoning, the
- 1:31:23maximum curb cut is 20 ft wide. We are
- 1:31:26showing currently a 24 ft curb cut
- 1:31:28width, but then the arrows are 20 ft and
- 1:31:30the drive aisle after it will be on the
- 1:31:32street.
- 1:31:33Uh the four minor waivers are for the
- 1:31:35front built-to zone. So, first one is
- 1:31:38per the zoning, the building needs to be
- 1:31:41within 5 ft of the perimeter of the
- 1:31:43property line. But, because of the flood
- 1:31:47uh resiliency, we the space to get up
- 1:31:50into the building. So,
- 1:31:52we're trying to set that back.
- 1:31:53Uh the building width uh the the zoning
- 1:31:56permits 150 ft. So, we're less than 10%
- 1:31:59over, but we're a little bit wider this
- 1:32:01far of 162 ft.
- 1:32:03Um and then there is a blank wall on the
- 1:32:07ground floor.
- 1:32:10Here, so in order to get this drive out
- 1:32:12here so that the cars can come through,
- 1:32:14that means that we need to put the
- 1:32:16front-facing utility entry here.
- 1:32:20Um instead of being able to like break
- 1:32:21it up or put something in between. Uh so
- 1:32:24that creates uh
- 1:32:26a blank wall that's a little bit larger,
- 1:32:27but we're articulating that with
- 1:32:29different materials and potentially
- 1:32:30putting signage there.
- 1:32:32>> Can you show that blank wall on the
- 1:32:33front right here?
- 1:32:34>> The um
- 1:32:35yeah, it's
- 1:32:38here.
- 1:32:39>> Okay.
- 1:32:39>> So our thought is like we can add
- 1:32:41signage here adjacent to it and then use
- 1:32:43the landscaping to soften that. Um so
- 1:32:46that way it's not just a big a stretch.
- 1:32:52And then the fourth waiver is related to
- 1:32:54signage. Uh per the zoning
- 1:32:57the letter of it says that the wall
- 1:32:59signage needs to be uh
- 1:33:01above the storefront. We're showing it
- 1:33:03as adjacent uh in our drawings, which I
- 1:33:06can pull those up, but
- 1:33:08um that's largely because here the
- 1:33:09storefront runs all the way to the top,
- 1:33:11so we have the signage here to help
- 1:33:14break up that
- 1:33:16uh blank wall facade. Um whereas it'll
- 1:33:19be above the
- 1:33:21the storefront for the retail.
- 1:33:24And then this is the overall site plan.
- 1:33:27So this is 102 parking spaces.
- 1:33:30The EV spaces here to the south, the
- 1:33:32bike parking will be
- 1:33:34uh under the overhang of the building
- 1:33:36adjacent to the back entry. Um and then
- 1:33:40we have our ADA spaces here as well.
- 1:33:42Uh Paul, was there anything else with
- 1:33:44the
- 1:33:45>> Um I'll just say quickly uh
- 1:33:49we're to
- 1:33:50redeveloping a largely impervious site
- 1:33:53and and actually reducing by 8% the
- 1:33:56impervious area.
- 1:33:58Um [snorts] I have verified in
- 1:34:00communication with the city engineer the
- 1:34:02base flood elevation we're using 155.4.
- 1:34:06So, the finished floors are all 2 ft
- 1:34:08above that.
- 1:34:10Um and happy to answer any questions
- 1:34:14regarding our our civil site plan or
- 1:34:16engineering related issues.
- 1:34:19>> Can you just speak to just a little bit
- 1:34:21about how right now there is storm water
- 1:34:24that and it runs through the site, it
- 1:34:26connects other properties as well, and
- 1:34:29how that's going to all be redirected
- 1:34:32and on an interim when the construction
- 1:34:35is not being on this site, how the storm
- 1:34:39water is going to be addressed from the
- 1:34:40adjacent sites and that doesn't back up
- 1:34:43there?
- 1:34:43>> Sure. Um so, we have I believe four
- 1:34:47connections. There's a small catch basin
- 1:34:50from Bob Ryan's property that goes into
- 1:34:53a basin on our site. We have a small
- 1:34:56basin from the teachers union
- 1:35:00on the adjacent site who have an
- 1:35:02easement here and a small 6-in line that
- 1:35:05comes onto our site and then there's uh
- 1:35:08one other line from the federal credit
- 1:35:11union that actually won't be affected.
- 1:35:14We'll be rerouting the storm up
- 1:35:16Let me show it better on a different
- 1:35:18plan. Um so, it's really just these two
- 1:35:20basins which are essentially overflows
- 1:35:24from a drywell system on this property
- 1:35:26adjacent.
- 1:35:28Um
- 1:35:29not really concerned about
- 1:35:32during construction. What they would go
- 1:35:35from downstream and back, so these would
- 1:35:39by the time these are tied back in,
- 1:35:42they they would be connected to the Frog
- 1:35:44Alley system that discharges
- 1:35:47that way.
- 1:35:48Um
- 1:35:49if we have to do any temporary bypass
- 1:35:53uh
- 1:35:53if there's a storm, then they're not
- 1:35:55connected in the couple days while we're
- 1:35:58reconnecting these
- 1:36:00these 6-in lines, uh we'll we'll do that
- 1:36:03as needed.
- 1:36:05>> And you're proposing a new um
- 1:36:09What's the name of it?
- 1:36:10>> The hydro-dynamic separator.
- 1:36:12>> Thank you.
- 1:36:13>> That'll That'll help us meet our water
- 1:36:15quality goal and treatment for the slip
- 1:36:18redevelopment slip. Um allows for the
- 1:36:21use of those, and that's
- 1:36:23that'll be here right before going out
- 1:36:26the Frog Alley.
- 1:36:27Um and that will be able to convey the
- 1:36:30100-year storm flow while while treating
- 1:36:33the storm water.
- 1:36:34>> I don't know the board is familiar with
- 1:36:37that. Can you just kind of describe the
- 1:36:38system because I don't think it's
- 1:36:40something that we're
- 1:36:40>> Sure. It's more of a mechanized uh
- 1:36:43system
- 1:36:45um
- 1:36:46that has like a swirl
- 1:36:48um
- 1:36:49I I call it a filter filtration system
- 1:36:52that that treats storm water and and
- 1:36:54discharges it a cleaner uh storm water
- 1:36:57we used one at Benedictine and
- 1:37:01we've used them all over for
- 1:37:02redevelopment projects. It's I think a
- 1:37:056-ft diameter. Looks like a looks like a
- 1:37:08dry well, but it has a
- 1:37:11it it's mechanized and and provides our
- 1:37:14treatment.
- 1:37:15>> Does that need to be serviced or
- 1:37:17emptied?
- 1:37:18>> There's There's some maintenance
- 1:37:20requirements um
- 1:37:22I'm sure every 5 to 10 years.
- 1:37:24I I would have to check the exact.
- 1:37:28>> The The building is anticipating having
- 1:37:29a building superintendent.
- 1:37:31>> Okay.
- 1:37:31>> So maintenance should be easily covered.
- 1:37:40>> Yep. So if there's any questions for our
- 1:37:41group, thank you.
- 1:37:47>> So
- 1:37:48just for the record numbers, we've
- 1:37:50obviously you've got staff notes and we
- 1:37:52did send the staff notes out to you all.
- 1:37:56I'm sure some of you will look at them
- 1:37:58and digest them
- 1:38:00and
- 1:38:01we'll be making
- 1:38:03comments back on them. If you have any
- 1:38:05questions for us about anything that is
- 1:38:09within those, let us know
- 1:38:11before next month.
- 1:38:14This does need to go to the county, so I
- 1:38:17do want to forward to
- 1:38:19if they're comfortable with the level of
- 1:38:21information. I think it's developed we
- 1:38:23think it's developed enough to send that
- 1:38:26referral to the county planning board
- 1:38:29so that we can do that next month. I
- 1:38:31think also we would ask the board at
- 1:38:33public hearing.
- 1:38:35There's obviously one required by law
- 1:38:37for the lot line revision that is part
- 1:38:40of the project. I think a site plan
- 1:38:43public hearing is also in order
- 1:38:45on this.
- 1:38:47The other thing I'm just as we talked
- 1:38:49about with the 25 foot court one, I
- 1:38:51think that there should be some um
- 1:38:54uh more visual simulations done. Um I'd
- 1:38:58like the board to think about and
- 1:39:00maybe tonight come up with a couple of
- 1:39:03locations that, you know, as you're
- 1:39:06coming down Schwank or going up, you
- 1:39:08know, either direction on Schwank I
- 1:39:10think it'd be really appropriate to
- 1:39:12have some
- 1:39:14visual simulations for day and night um
- 1:39:17with building context of existing
- 1:39:20buildings in place.
- 1:39:22Um
- 1:39:23and also maybe from up above to get any
- 1:39:26sense of
- 1:39:28from the historic district. So, I don't
- 1:39:31know what are the board's thoughts on
- 1:39:33that.
- 1:39:37>> And this is a
- 1:39:39six-story building primarily is a
- 1:39:42one-story area.
- 1:39:44>> So, especially with the front street
- 1:39:45just to see what it'll do to the view.
- 1:39:48That would be one location.
- 1:39:50Not that it's saying.
- 1:39:58>> So, the that parking lot on on North
- 1:40:01Front Street is
- 1:40:03right. This is the guardrail.
- 1:40:05>> Yeah, yeah.
- 1:40:07>> From Front Street, it's due to the
- 1:40:09mature trees that are sort of on that
- 1:40:11slope up to the parking lot. They
- 1:40:13actually provide quite a bit of
- 1:40:15screening from Front Street.
- 1:40:18Um but that's sort of the perspective
- 1:40:20there.
- 1:40:20>> Yeah, this is a the normal perspective.
- 1:40:23>> Do we know the grade change between the
- 1:40:25our parking lot and
- 1:40:27the parking lot of North Street?
- 1:40:29>> Yeah.
- 1:40:36We go from 180 to about what what do we
- 1:40:39have? 150 or 160? Or 155? Yeah.
- 1:40:4425 ft.
- 1:40:49>> I just I think it's important
- 1:40:51to have those simulations particularly
- 1:40:54because one of the waiver requests is
- 1:40:58to have both the fifth and the sixth
- 1:41:00floor extended
- 1:41:02back
- 1:41:04all the way to the rear of the building,
- 1:41:06which is
- 1:41:08quite a large deviation
- 1:41:11waiver request. I wasn't It's close to
- 1:41:14200% and so I think it's important to
- 1:41:17understand
- 1:41:19visually and different
- 1:41:25view viewpoints.
- 1:41:30>> Sure, and we can also show it in the
- 1:41:31context of the Kingstonian, which will
- 1:41:34also be like a virtual drive by there.
- 1:41:38And the
- 1:41:41I mentioned it like the reason to bring
- 1:41:43that waiver or why we're requesting that
- 1:41:45is we get about
- 1:41:4730
- 1:41:49additional units of affordable housing.
- 1:41:51And so it it has a lot of implications
- 1:41:55if we were to lose those units, we'd
- 1:41:56likely be pushed into the HCR 9%
- 1:42:01financing program, which then is
- 1:42:03competitive, which you know, I can't say
- 1:42:06when we would close with that. And so
- 1:42:08keeping our building at a certain scale
- 1:42:11helps on multiple fronts.
- 1:42:14>> We're doing the housing diversity
- 1:42:16through the
- 1:42:17through the through the heart and those
- 1:42:18will be all up in two years, but we'll
- 1:42:20definitely do those visuals that you
- 1:42:21requested.
- 1:42:22>> Yeah.
- 1:42:23>> Do we know if the parking lot has
- 1:42:25been put out in RFP and there's been
- 1:42:28responses to develop on that?
- 1:42:30They're going to alter it slightly.
- 1:42:33Any issues to be
- 1:42:35to be able to be put on the parking lot
- 1:42:37on the west side?
- 1:42:38We'll get various vehicles for it.
- 1:42:41>> Yeah, absolutely. So we can take one
- 1:42:43from that parking lot for other areas.
- 1:42:45>> But we haven't seen the intersection.
- 1:42:49>> Okay, I got you. I got you.
- 1:42:50>> Uh no, other other intersection. Just
- 1:42:53with the parking lot.
- 1:42:54>> Yeah.
- 1:42:54>> Yeah. Yeah.
- 1:43:09>> The three affordable housing units
- 1:43:12going to be
- 1:43:14solely sourced through Roto?
- 1:43:18>> We will be the managing agent,
- 1:43:20um but the uh
- 1:43:23limited market environment of water of
- 1:43:2540 units.
- 1:43:29>> And we'll do, you know, it's always been
- 1:43:32our precedence to notify the community
- 1:43:34as much as we can that the lottery is
- 1:43:36active to, you know, encourage as many
- 1:43:39applications, especially locally, as we
- 1:43:41can.
- 1:43:42You know, we want people who live in
- 1:43:44Kingston who need an affordable home to
- 1:43:47be the first people to apply for this.
- 1:43:48So, if there's any suggestions of
- 1:43:50organizations we'd like to see us do
- 1:43:52outreach to, we're happy to consider
- 1:43:54that and make sure that we tell them
- 1:43:56that the lottery is active and even give
- 1:43:58them heads up. You know, in the past
- 1:44:00we've done even trainings on like this
- 1:44:02is how you actually apply for it when
- 1:44:03it's a complicated lottery system,
- 1:44:05things like that.
- 1:44:09>> So,
- 1:44:10the parking demand
- 1:44:12and reduction study it came in late. I
- 1:44:15just quickly reviewed it and a couple
- 1:44:17things.
- 1:44:19Um,
- 1:44:20I'm I'm thinking that, you know, what
- 1:44:22might be nice to incorporate into the
- 1:44:25project would be maybe a bus shelter
- 1:44:28along the public right-of-way to
- 1:44:30encourage, you know, ridership um or a
- 1:44:33place for them maybe
- 1:44:36um
- 1:44:36it's not, you know, I know you said you
- 1:44:39would provide information to residents,
- 1:44:42but I'm not seeing the
- 1:44:46intermodal kind of connectivity that I
- 1:44:48would like to see in that study
- 1:44:50identified.
- 1:44:51>> Sure, and we can certainly talk to
- 1:44:54bus operator here and see if there is an
- 1:44:56opportunity for that and at the very
- 1:44:58least do wayfinding, you know, if they
- 1:45:00say you don't want a bus shelter there,
- 1:45:01but do wayfinding of, you know, bus stop
- 1:45:04100 ft this way, whatever it is.
- 1:45:06Certainly want to encourage
- 1:45:08multimodal transit.
- 1:45:12>> Now, with this being in the flood plain,
- 1:45:14what
- 1:45:16are there any specialized construction
- 1:45:18techniques that you're going to use to
- 1:45:21put pilings in or how is
- 1:45:23the support going into the ground to
- 1:45:25bedrock or what
- 1:45:28that look like?
- 1:45:29>> So, our structural engineer is still
- 1:45:31working on that based off the geotech
- 1:45:33report, but um the basic feedback that
- 1:45:35we've gotten is because we're we're
- 1:45:36building up uh the 5 ft uh to do it with
- 1:45:40fill so that we're on slab
- 1:45:43um so that that would prevent having to
- 1:45:46wet flood proof anything.
- 1:45:49Uh so,
- 1:45:50currently
- 1:45:52uh the piles are are pretty standard. Um
- 1:45:55the depths will be based off of the
- 1:45:56geotech report um in terms of like flood
- 1:45:59resiliency, there isn't
- 1:46:01a lot extra that we have to do because
- 1:46:03we're doing uh
- 1:46:04the pile system here.
- 1:46:07>> Geotech says piles
- 1:46:09>> Yeah, mhm.
- 1:46:14>> So, would you be doing um so,
- 1:46:17for the pilings, would you be doing
- 1:46:19you'd be doing compacting, right? From
- 1:46:21what I understood reading the geotech,
- 1:46:23like they would be compacting the soils.
- 1:46:27>> That's what I already said.
- 1:46:28>> Okay.
- 1:46:31Um would you
- 1:46:33be doing any surveying of the adjacent
- 1:46:36properties or monitoring any of the
- 1:46:39buildings that are
- 1:46:40>> Absolutely, yeah. You know, normal
- 1:46:43course of business, we'll do a
- 1:46:44pre-construction survey of, you know,
- 1:46:46our geotech engineer or structural
- 1:46:48engineer will recommend which
- 1:46:49properties, how far it should extend,
- 1:46:51and then we'll do vibration monitoring,
- 1:46:53optical monitoring, whatever is
- 1:46:55necessary per their recommendations.
- 1:47:02>> So, do you I have listed in the agenda
- 1:47:06the New York State Office of Parks,
- 1:47:07Recreation and Historic Preservation as
- 1:47:09a circulating
- 1:47:11uh agency. Do you guys anticipate
- 1:47:15reaching out to them through Chris?
- 1:47:17Because the reason I ask is because what
- 1:47:20I found that would be happening more and
- 1:47:22more recently is once DEC gets it in
- 1:47:25their system, it takes several months.
- 1:47:28Then it goes to OPRHP, and then it's
- 1:47:31like 5 months later you get a letter
- 1:47:33that says, "Oh, we want to see
- 1:47:35everything." So, do you guys
- 1:47:37go to Chris right at the beginning?
- 1:47:39Should we do it? Should we
- 1:47:41>> I don't
- 1:47:43I typically only would have if we were
- 1:47:45doing the coordinating review, which
- 1:47:47which this is not we're treating as a
- 1:47:50activity,
- 1:47:51>> Yeah, my concern my concern is that
- 1:47:53they're going to get it
- 1:47:55and then say, "Okay, we're commenting."
- 1:47:57I mean, even though they're not
- 1:47:59interested agencies can
- 1:48:01>> in the each like if you're going for
- 1:48:03state funding,
- 1:48:05finance agencies
- 1:48:06>> It's going to be in the system.
- 1:48:07>> But that agency may develop a referral
- 1:48:10process.
- 1:48:11>> Okay.
- 1:48:12>> Well, we'll talk when we're
- 1:48:14But you don't you you we can do it
- 1:48:16anywhere we want.
- 1:48:17>> Well, we can check in with HCR if you
- 1:48:19want.
- 1:48:19>> Yeah, I just don't want to find out like
- 1:48:215 6 months after we
- 1:48:23>> Yeah, I don't want to have
- 1:48:25I don't want to have a shovel-ready
- 1:48:26project, but but it's in the hole for
- 1:48:28it.
- 1:48:31Um and so, you had mentioned uh
- 1:48:34settings referring this to the county.
- 1:48:36We did have our gateway meeting with
- 1:48:38Dennis Doyle a few weeks ago.
- 1:48:41No substantial comments came out of
- 1:48:43that. We learned about
- 1:48:45Dennis's personal feelings on brick.
- 1:48:48Uh
- 1:48:51That that was the most controversial
- 1:48:53thing out of there.
- 1:49:00>> They're just saying that
- 1:49:01personal
- 1:49:13>> Okay. So,
- 1:49:14where
- 1:49:16I can't hear you. I'm sorry, but I can't
- 1:49:17hear you.
- 1:49:18Did you hear me?
- 1:49:19Okay.
- 1:49:20>> he's going to be.
- 1:49:20>> Okay. So, we are making the visuals. Do
- 1:49:23you want to see visuals from the
- 1:49:27intersections
- 1:49:29of
- 1:49:29Plaza and Kenchway and looking towards
- 1:49:32the this project.
- 1:49:34>> Um this project alley and Kenchway
- 1:49:36>> Plaza alley and Kenchway and then up
- 1:49:38above from North Front Street looking
- 1:49:41down. Any any other
- 1:49:43>> I think I'd like to see it just kind of
- 1:49:45a sign with the one-story buildings.
- 1:49:47They're not as tall as six stories, but
- 1:49:49look compared next to
- 1:49:51>> Okay.
- 1:49:51>> You know, like Ryan and next You know
- 1:49:53what I'm saying? Like something where
- 1:49:55you can see the surrounding property.
- 1:49:58>> Yep.
- 1:50:01>> We can do the videos.
- 1:50:03>> Um I would do them in both night time
- 1:50:07and day time.
- 1:50:10I don't
- 1:50:11I think the night time particularly
- 1:50:12because if you're going to have the
- 1:50:14um
- 1:50:16top floor have that open
- 1:50:18>> air with the terrace restaurant
- 1:50:20>> the lights and how that might impact
- 1:50:23>> Yeah. We're also just in a doing um EGC
- 1:50:27as part of the ACR process. So, we are
- 1:50:28following the uh dark sky standards in
- 1:50:30the lighting. So, but as is worth
- 1:50:34probably making any kind of light still
- 1:50:35up. So,
- 1:50:37uh we've been They've been looking at
- 1:50:38the light poles through that as it So,
- 1:50:39we'll we'll
- 1:50:40give you some illustrations of that.
- 1:50:46>> I think we have it.
- 1:50:49You
- 1:50:49have it.
- 1:50:52No, we didn't.
- 1:50:53>> Mhm.
- 1:50:57>> I think we brought that in.
- 1:51:03>> Okay.
- 1:51:04>> Now, if everything goes to plan
- 1:51:08then if
- 1:51:10What are the [clears throat] timelines
- 1:51:11you guys are at?
- 1:51:13>> I think I will
- 1:51:14>> Sure.
- 1:51:15So, we have
- 1:51:18pretty aggressive design schedule. We're
- 1:51:20currently on pause until we get the
- 1:51:23feedback from the planning board, but
- 1:51:25when we resume, we'll be resuming with
- 1:51:28design development
- 1:51:29and we have a schedule that will get us
- 1:51:32to 100% CD drawings by the spring.
- 1:51:36In our conversations with HCR, we've
- 1:51:40been talking about a
- 1:51:43late summer closing and we have also
- 1:51:46been talking since this is a tax credit
- 1:51:48project, we need tax credit investor.
- 1:51:52We currently have a couple of
- 1:51:54investors who are interested and are
- 1:51:55holding us our project in their 2027
- 1:51:58pipeline.
- 1:51:59Tax credit equity has gotten very tight
- 1:52:01in the past couple of years and so we
- 1:52:04wouldn't be able to consider financial
- 1:52:05closing [clears throat] without also
- 1:52:06having that sort of piece lined up.
- 1:52:11And then we're underwriting a 30-month
- 1:52:14construction timeline, I believe.
- 1:52:20I'm sorry, the I think it's 24. I'm
- 1:52:23sorry, I'm completing projects.
- 1:52:25>> The fire chief did have some comments
- 1:52:27that I did upload. I don't know.
- 1:52:30You you should get notification when the
- 1:52:32>> We get them as well.
- 1:52:33>> Ours are being asserted.
- 1:52:34>> I just want to make sure you were okay
- 1:52:36because he had some height
- 1:52:38>> Yeah.
- 1:52:38>> complaints and
- 1:52:39>> We looked at that. I know that
- 1:52:41the minimum truck height is 16 ft. Our
- 1:52:45passer were holding 18 ft right now
- 1:52:48under the building itself. Uh but it
- 1:52:51does vary because of the slight grade
- 1:52:53change but it's always at like 16 ft 9
- 1:52:56to 17 ft and a half.
- 1:52:58Um and then there's a lot
- 1:53:00There's some room in there so we can
- 1:53:01play with the design of that. It's still
- 1:53:03in that development further.
- 1:53:04>> And we've been in contact with the
- 1:53:06chief.
- 1:53:07>> We've met with Chris and he actually
- 1:53:09asked for
- 1:53:12proposed swing gate. We So we did two
- 1:53:15parking spots there for now and
- 1:53:18cuz this is the fire department.
- 1:53:19>> Yes.
- 1:53:20>> Will the fire department there?
- 1:53:23And then the other comments were mostly
- 1:53:25regarding the building and alarm.
- 1:53:28>> Yeah, yeah, alarm.
- 1:53:29>> Fire alarm system.
- 1:53:31Okay, the commercial building space.
- 1:53:33>> I find that the layout is a
- 1:53:35>> I just want to make sure
- 1:53:36see those sitting there.
- 1:53:38>> Sometimes we don't know that we say we
- 1:53:41>> Yeah, you upload it and you open a
- 1:53:42notification.
- 1:53:43>> [laughter]
- 1:53:44>> Those things are always getting buried.
- 1:53:48So the referrals are going to be done by
- 1:53:49you or do you guys want to take care of
- 1:53:51and setting the public hearing? Do you
- 1:53:53know what day that will be but when we
- 1:53:56get here?
- 1:53:56>> Uh next meeting November
- 1:54:00I would say
- 1:54:0116.
- 1:54:03>> 16 October.
- 1:54:05>> November 16.
- 1:54:09November 16.
- 1:54:11Be our next meeting.
- 1:54:13>> You guys will be taking care of that or
- 1:54:15do you want me to I you guys take care
- 1:54:17of the notice of
- 1:54:17>> Yes, we will.
- 1:54:19Yeah.
- 1:54:21So that will be the public hearing.
- 1:54:29Do you have any comments on the sub
- 1:54:31notes that we sent?
- 1:54:32>> Um no, I think they were all pretty
- 1:54:34straightforward. So if there's anything
- 1:54:37that comes up as you develop
- 1:54:39>> Okay. We're I'm still pulling from
- 1:54:42water, sewer, and engineering. So as
- 1:54:46soon as we
- 1:54:46I'll make sure we try and get those to
- 1:54:48you as as possible.
- 1:54:49>> Okay.
- 1:54:51So you'll notice both right away when
- 1:54:52you begin the land then. Is that it?
- 1:54:55>> Yes.
- 1:56:15>> [laughter]
About this transcript
This page contains the full transcript of Planning Board Meeting 10-19-2026 by City of Kingston, generated from the public captions YouTube serves with the video. The transcript has 16,166 words across 2,963 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, caption language selection, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.