Planning Board Meeting — Transcript
Full transcript
- 0:04stand of Jesus.
- 0:28Okay.
- 0:29>> Good evening everyone and welcome to the
- 0:32city of Kingston planning board meeting.
- 0:34Uh my name is Suzanne Kaggel. I'm the
- 0:36planning director for the city of
- 0:37Kingston. Uh before we start the
- 0:40meeting, I just have a few quick
- 0:41announcements that I want to go over. If
- 0:43you do have a cell phone, I'm just going
- 0:45to ask that you please put on silent. so
- 0:47that it doesn't interfere uh with any of
- 0:50the meeting discussion uh that's going
- 0:52on. Um I want to let everybody know that
- 0:56this meeting is being recorded and is
- 0:58being livereamed. So can you please be
- 1:00respectful of that. Uh if we have an
- 1:03emergency, we ask that you please use
- 1:05the stairs, not the elevator. If you
- 1:06need assistance, please ask us um and
- 1:09we'll help you. Uh the restrooms are
- 1:12through the chambers and on the opposite
- 1:14side. And as you go through, men's would
- 1:17be to the left, women's to the right,
- 1:19and if uh you have any conversations
- 1:22outside of those happening with the
- 1:25board, we just ask that you have them
- 1:27outside of the room uh so that you're
- 1:29not interfering with other discussions
- 1:31that are going on. With that, um I am
- 1:34going to turn it over to our standing
- 1:37chair, Matt Gillis, of this evening, to
- 1:39introduce the rest of the board members
- 1:42and staff that are presenting. Yeah.
- 1:44Well, good evening folks. Thank you. Um,
- 1:46so tonight we have planning board member
- 1:48Kairen Grande, uh, Vincent Archer, uh,
- 1:52Andrew Harris, and then Sue Kango, the
- 1:56planning director, Kyla Dbe, and then,
- 1:59uh, older person cats in the back.
- 2:03So,
- 2:05first item, uh, that the adoption of the
- 2:08September 22nd, 26th planning board
- 2:11meetings. Everyone's had a chance to
- 2:12review. Any additions, corrections?
- 2:17No. Motion to approve. Andrew Harris.
- 2:21All in favor?
- 2:23>> Second.
- 2:24>> I'll second. I
- 2:27>> All in favor? Okay, we are good. Uh we
- 2:31are going to shuffle a couple agenda
- 2:33items around just for efficiency this
- 2:36evening. Um
- 2:38back to it. Uh 409 East Chester Street.
- 2:43If you guys could come up to them.
- 2:49>> Yes. Thank you.
- 3:01Uh number 10. Yeah.
- 3:17Yeah, signing.
- 3:28>> Okay. Uh item 10 tonight, number 409
- 3:32East Chester Street. That's a major
- 3:34waiver request to increase the build to
- 3:37zone and decrease the rear yard setback.
- 3:40SPL48.75-9-1000
- 3:46uh seeker determination.
- 3:48That's
- 3:51>> it's type two.
- 3:52>> Type two. All right. Uh transex zone T3N
- 3:56ward 7 Winston and Tracy and Daly
- 3:59applicant owners.
- 4:02If you guys just quick intro for the
- 4:04record.
- 4:06>> I'm
- 4:08welcome.
- 4:10>> So you guys are seeking a building
- 4:12permit construction addition onto your
- 4:14home.
- 4:14>> Yes.
- 4:15>> Okay. Um
- 4:18so we have referred this to the uh
- 4:20zoning of horsemen. Uh two waiverss were
- 4:23identified due to the location of the
- 4:24addition. Just want to give us a quick
- 4:26overview of what you're looking to do.
- 4:29So the main thing that they wanted to do
- 4:31was put in a playroom. We're past the
- 4:33parents and um we have a nonverbal
- 4:39uh living room. We have him now for two
- 4:41years. Um he's artistic and he needs
- 4:46sensory input. So he's always moving
- 4:48jumping and the living room is about our
- 4:52current bedroom and there's no rest with
- 4:54us.
- 4:55>> Okay. So the main thing was to put in
- 4:57additional um playroom. Also my parents
- 5:00are living with us and the room they're
- 5:03now using is very small and my mom has
- 5:06arthritis. So we wanted to do a bigger
- 5:09room also. And so that's how we came up
- 5:13with the additions and then we decided
- 5:15to go one more room just in case if we
- 5:18have family members. So coming to visit
- 5:20stuff like that. Essentially what
- 5:23they're doing is they're following the
- 5:24current building form, you know, like
- 5:27the building lines versus having to
- 5:30bring it more towards the street which
- 5:33is a busy street and keeping it in line
- 5:36and just extending to the side.
- 5:38>> Yes.
- 5:45>> Okay.
- 5:46So where
- 5:48starting is ask the questions.
- 5:52>> So for our waiver checklist so board
- 5:56will go through these questions with a
- 5:58yes or no um to help make our
- 6:00determination. So the applicant has
- 6:03included a waiver request letter that
- 6:04clearly identifies and describes the
- 6:06waiver being proposed accompanied by
- 6:08plans and other vis visual
- 6:10representations that is applicable.
- 6:13>> Yes.
- 6:16Oh [clears throat] yes.
- 6:18>> Yes.
- 6:19>> Uh in their letter, the applicant
- 6:20describes in detail why the waiver is
- 6:23needed and how the waiver request is
- 6:25consistent with the intent, design, and
- 6:27compatibility of the transct zone in
- 6:29which the project is located.
- 6:32>> Yes. Yes.
- 6:37Will granting the waiver contribute to
- 6:39the realization of the overall intent of
- 6:41the transex zone that an approved
- 6:43project which will be an attractive
- 6:45durable contribution to the transex
- 6:47zone?
- 6:51>> Uh we have yes or no. Yes.
- 6:58>> Uh to support walkable neighborhoods
- 7:00andor mixeduse centers. The project
- 7:03emulates the neighborhood context for
- 7:05how far the building buildings relate to
- 7:08the sidewalk, how the saw is designated,
- 7:10and how the building interacts with the
- 7:12street.
- 7:15>> Yeah.
- 7:17>> Continuation.
- 7:21>> The project supports a green and
- 7:23resilient future. For example, by
- 7:25reducing vehicular miles traveled,
- 7:27providing green infrastructure and/or
- 7:28street trees and/or including
- 7:30highquality usable open space.
- 7:37Project supports incremental development
- 7:40patterns in its size and density and
- 7:42supports infill development or the reuse
- 7:44of existing buildings.
- 7:47>> Yeah. Yes. Yes, sir.
- 7:50The project supports the provision of a
- 7:52variety of housing types to support a
- 7:54range of income levels, age groups, and
- 7:56family units.
- 7:58>> Yep.
- 8:00>> The project specifies street design that
- 8:02is walkable, bikable, and will reinforce
- 8:04safe and comfortable environments for
- 8:07all users.
- 8:11>> Okay. So,
- 8:13>> looks like we're good for the waiver.
- 8:16>> Yep. Um so it is recogniz type two.
- 8:20>> Okay. This is a type two in seeker and
- 8:24then do we have to do a motion and
- 8:26>> yuction to approve the waiver.
- 8:28>> Who would like to make the motion?
- 8:30Andrew secondra.
- 8:32All in favor?
- 8:34>> I
- 8:34>> opposed.
- 8:36Passed.
- 8:40>> Thanks.
- 8:45Any questions? He's
- 8:5695 Wilson Avenue. Okay. He's come on up.
- 9:12>> Welcome. We can just get names for the
- 9:15record. Steve Schuma.
- 9:18Oh, they welcome.
- 9:24>> Okay.
- 9:26So, item 11, 95 Wilson Avenue, major
- 9:31waiver request to install a larger curve
- 9:33cut than permitted. Uh, SBL48.269-4-8.
- 9:40Seeker determination. Uh, it's typ.
- 9:43>> Yes.
- 9:43>> Okay. Transex zone T3N ward 6
- 9:48and a so pronunciation of your name
- 9:51>> I like the boom
- 9:53>> tweet and Steve Schoonmaker the
- 9:55applicant voters
- 9:58um the applicant is for a major waiver
- 10:00for section 405.16e3
- 10:03which limits the maximum curtain cut to
- 10:0610 ft for a single family home.
- 10:09Um remove the existing driveway to add a
- 10:12pool and fenced in yard. We're now
- 10:13looking to relocate the driveway to
- 10:15accommodate an off street space for the
- 10:17vehicles. Um, you guys just give us a
- 10:20quick overview.
- 10:22>> Sure. Um, we started this process a
- 10:25little over a year ago.
- 10:27Um, we installed the pool and we want to
- 10:30move the driveway 12 ft from the
- 10:32original area where it was.
- 10:36>> So, yeah, you see it was the driveway
- 10:38was kind of was more over towards the
- 10:40pool. So, we wanted to move the
- 10:42driveway. It would be if you were on
- 10:45Seavoy towards Wilson, about 12 feet
- 10:48over where Richland was. And, uh, you
- 10:52know, we're asking for reasonable
- 10:53accommodation because we'd have a adult
- 10:55son with autism.
- 10:57Um, we first initially applied for the
- 10:59permit. Um, they required us to get a
- 11:02survey, which we did do, but it's very
- 11:06confusing because
- 11:08in the emails we've had with the build
- 11:10code enforcement office,
- 11:13they said we didn't need a permit.
- 11:16And the DPW, we'd have to apply for a
- 11:19permit for them initially, which Mr.
- 11:22Kums came out I would say it was
- 11:24probably in June of last year and did a
- 11:27site survey and he said they see any
- 11:29issues with the driver beyond it wasn't
- 11:32as large as initial was you know where
- 11:34the driveway was to be moved and he
- 11:36didn't see a problem because it was from
- 11:38the curb it was 50 possibly fit the heat
- 11:40of the curbon Wilson
- 11:44um so we got a survey couldn't get a
- 11:46survey done until the beginning of this
- 11:48year and
- 11:50I am kind of dumbfounded why I had to
- 11:54even get a survey.
- 11:56Um it's contextual to the adjacent
- 11:59properties still have wise rocket waste.
- 12:02Some have been in recent years so it's
- 12:04not grandfathered. Some have been added
- 12:06on to consulted with some of the
- 12:08neighbors never had required to survey.
- 12:10But primarily, like I said, where we're
- 12:12doing the uh
- 12:14you know, alterations to our home is
- 12:16because of our our oldest son who's 23
- 12:18who has severe autism.
- 12:20>> And uh currently we're parked on the
- 12:22street and we haven't been able to do
- 12:24anything until we resolve this. And it's
- 12:26very unsafe.
- 12:28We, you know, for him to go out on the
- 12:30street because sometimes he they say,
- 12:32you know, getting in and out of the car,
- 12:34you know, century. Sometimes he he, you
- 12:37know, he has a little anxiety and
- 12:38everything. And we even actually had two
- 12:40letters thrown in our yard of complaints
- 12:43over the last, let's say, six months,
- 12:46you know, anonymous letters, you know,
- 12:47kind of really, you know, um, degrading
- 12:50us and stuff about your situation about,
- 12:52you know, parking on the street with a
- 12:54child, having a kid with a a child with
- 12:56a condition, you know, you're not a good
- 12:58parent. So, you know, uh we did consult
- 13:01with an attorney and of course they felt
- 13:04like we would be better off putting for
- 13:06a reasonable accommodation in to see if
- 13:08we can get this resolved. Okay.
- 13:11>> Basically, just so there's an understand
- 13:13so the board has a little bit of
- 13:15background, residential properties are
- 13:18allowed for 10T wide per cut. They're
- 13:20asking for a dice larger than typical
- 13:25would be for a normal residential use,
- 13:27but they did in their application also
- 13:29provide representative examples of other
- 13:33properties within close proximity that
- 13:35have the same type of double wide
- 13:37driveways. So, we pretty standard ask
- 13:46Let's
- 13:52see. Any issue with not approving this?
- 13:56Okay. So, we need to just go through the
- 13:58checklist,
- 13:58>> right?
- 14:18Okay.
- 14:20>> The applicant has included a waiver
- 14:22request letter that clearly identifies
- 14:24and describes the waiver being proposed
- 14:25accompanied by plans and other visual
- 14:27representations as applicable.
- 14:30>> Yes.
- 14:31>> Yes.
- 14:33Uh in their letter, the applicant
- 14:35describes in detail why the waiver is
- 14:37needed and how the waiver request is
- 14:39consistent with the intent, design, and
- 14:41compatibility of the transsect zone in
- 14:43which the project is located?
- 14:45>> Yes.
- 14:45>> Yes.
- 14:47>> Uh will granting the waiver contribute
- 14:49to the realization of the overall intent
- 14:51of the transct zone and result in
- 14:53approved project which will be an
- 14:55attractive and durable contribution to
- 14:57the transex zone?
- 15:00>> Yes.
- 15:03To support walkable neighborhoods and/or
- 15:05mixed use centers, the project emulates
- 15:07the neighborhood context for how the
- 15:09building buildings relate to the
- 15:10sidewalk, how the facade is designed,
- 15:12and how the building interacts with the
- 15:14street.
- 15:15>> Nice.
- 15:17>> I'm not done on that, but
- 15:19yes.
- 15:22Uh the project supports a green and
- 15:24resilient future uh by for example
- 15:27reducing vehicular miles traveled,
- 15:29providing green infrastructure and/or
- 15:31street trees andor including high
- 15:33quality usable open space.
- 15:37>> Not ethical.
- 15:38>> Yeah.
- 15:40>> Uh the project supports incremental
- 15:43development patterns in its size and
- 15:44density and supports an infill
- 15:46development or the reuse of existing
- 15:48buildings.
- 15:56Project supports the provision of a
- 15:57variety of housing types to support a
- 16:00range of income levels, age groups, and
- 16:02family units.
- 16:05>> Project specifies street design that is
- 16:07walkable, bikable, and will reinforce
- 16:09safe and comfortable environments for
- 16:11all users.
- 16:13>> Yes.
- 16:15>> Yes.
- 16:19Oops.
- 16:20>> I got one vote for each.
- 16:21>> So you're not clickable
- 16:24or see
- 16:29how
- 16:29>> I think it's okay.
- 16:31>> You think it's non?
- 16:33>> Well, you're no. The reason why I said
- 16:35last is because it's
- 16:38the only person that's not
- 16:40[clears throat] able to
- 16:44be safe and use the environment
- 16:47comfortably is their son. So this would
- 16:50include him
- 16:52and therefore it would be
- 16:55specific to the walkable
- 16:58area which is in her cut on the
- 17:00sidewalk.
- 17:06>> So you're going to have to take a vote
- 17:09of
- 17:11the total overall waiver.
- 17:18>> Okay. So, um I guess we're going to do a
- 17:21board vote and then approve the waiver.
- 17:25>> Make a motion.
- 17:26>> Make a motion um to approve this waiver.
- 17:31>> Second.
- 17:31>> Second.
- 17:32>> Okay. All right. I
- 17:34>> I
- 17:40Okay. So, it's approved.
- 17:57Hey, maybe
- 18:08>> uh item number two, 370 Albany Avenue,
- 18:13public hearing for administrative
- 18:14Special permit renewal to operate a car
- 18:16wash.
- 18:18Is anyone here for 370?
- 18:22>> Anybody's here to speak?
- 18:23>> Oh, to speak on 370. All they have
- 18:31to
- 18:32>> make a motion.
- 18:34>> Y motion to close the public hearing at
- 18:37370. And your second
- 18:40motion then second.
- 18:55>> All righty.
- 19:05All right. 713 Gerald Street,
- 19:08subdivision of the lands of Travis
- 19:09Meyers, SPL56357-14-210,
- 19:16seek of a termination type 2, transect
- 19:18zone T4N, W 7. Um,
- 19:23Travis Myers, applicant owner,
- 19:26is anyone here for 713 Gerald Street?
- 19:35Vat funding. So, um, basically what this
- 19:39one is, if if you recall, um, about a
- 19:43year or so ago, we reviewed a
- 19:46application to combine your parcels into
- 19:48one. We had a proposal to develop a four
- 19:52unit rowhouse type of structure. Um,
- 19:56financially that has economically become
- 19:59unfeasible for him. So he is now
- 20:03reverting back wanting to separate the
- 20:05parcels again. He's going to sell one
- 20:07off and retain the other. It's pretty
- 20:10straightforward.
- 20:11>> Pretty simple.
- 20:15Any questions from the board?
- 20:19>> This is unlisted.
- 20:23>> So
- 20:26make a motion to
- 20:30action. So this is an unlisted action.
- 20:46to accept that.
- 20:48>> This looks to be in order. Um make a
- 20:51motion to accept the short environmental
- 20:54assessment form. Vince Andrew second.
- 20:58All approved.
- 21:00Opposed. Okay.
- 21:05Sign up.
- 21:21Thank you.
- 21:26So any are there any questions on this
- 21:29line? Okay.
- 21:32So you will need five paper copies, one
- 21:36by
- 21:39final written in descriptions
- 21:42for um
- 21:45becoming signed and we will need
- 21:49uh the owner signature
- 21:53before the chairman and sign up
- 21:58l
- 22:00and for policy Yes.
- 22:02>> Okay.
- 22:13>> Um motion to approve this.
- 22:16Andrew second.
- 22:20All in favor? Opposed? All right. It's
- 22:23passed.
- 22:29>> Okay. 79 Journ Street.
- 22:34Um, so good evening. Hang on one sec.
- 22:38So, this is a subdivision of lands of uh
- 22:43three FFR LLC and a major waiver for
- 22:46rear yard set SPL56.42-14-21
- 22:52uh seeker determination type two.
- 22:56>> It's correct. Transex Oh, I'm listed.
- 22:59Sorry.
- 23:00Transex zone T4N ward 8 Michael Veterary
- 23:04applicant uh 3 FFR is the owner.
- 23:09>> Welcome back.
- 23:10>> Thank you. And just quick name for the
- 23:12record. Mike Ferry surveyor. I'm
- 23:15representing the Fras and 3 FFR LLC. Uh
- 23:18we have two homes situated on one lot on
- 23:22the corner of German and Ridge. Um
- 23:26pictures of the homes here. here. I know
- 23:28you guys have them in the application,
- 23:29but obviously we have fronting on German
- 23:33and then we have the brick home fronting
- 23:34on ridge. I had to tried to get some
- 23:36decent pictures here to show the spacing
- 23:38and so on, but they are in the
- 23:39application. Um, so we're trying to
- 23:43separate the two houses into separate
- 23:45deed lots. Uh, we come into a few things
- 23:48that um, not only the planning
- 23:50department but the building department
- 23:52um is interested in, including the
- 23:54spacing between the structures. uh being
- 23:56a building department related item, the
- 23:59offset to the rear of the building,
- 24:01being a waiver related mathematical
- 24:04item. Uh but we are with in terms of our
- 24:07lock coverage, we are um you know, we're
- 24:10good to go. We don't we don't we're not
- 24:12even close to the lock coverage um
- 24:16percentages.
- 24:17Um we've designed the new line to meet
- 24:20all of the 5-ft spread as required by
- 24:23the building department. Uh we've
- 24:26created an easement to bring utilities
- 24:29into the brick rear structure.
- 24:32Uh we are seeking the variance aka
- 24:35waiver for the rear um
- 24:40yard setback and otherwise
- 24:44um we are you know looking to get some
- 24:46type of uh two separate deed homes uh
- 24:51each having different frontage brick
- 24:52home fronting on street with the front
- 24:54facing street German obviously facing
- 24:57German street uh so they already have a
- 25:00a view of being separate ated. We're
- 25:02just trying to officially separate them.
- 25:06Um, and that is basically the gist of
- 25:10the story.
- 25:13>> I'm just going to talk about the
- 25:14easement that is going to be required as
- 25:16well, Mike,
- 25:18>> for the the utility easement. Yeah. So,
- 25:21in order for us to get the 5-ft spread,
- 25:24uh, we have to have an easement for the
- 25:26gas to um connect to the brick
- 25:30structure. We're obviously close in this
- 25:32area here. Um, and there's a picture of
- 25:35that area. Um, well defined in the
- 25:38application looking down between the
- 25:40structures. Um,
- 25:44small easement. Um, you know, L6 is on
- 25:50here is uh, you know, they're small
- 25:52distances. L4 being 21 ft. So, it's
- 25:55roughly 20 by 5t on one end. So, it's
- 26:00maybe 100 square ft,
- 26:03125 ft max.
- 26:12Questions from the board.
- 26:15>> Is it a new utility pool or exist?
- 26:18>> No, that's an underline. That's an
- 26:19underground gas line. That's probably
- 26:21from the, you know, the 80s, 70s, 80s
- 26:24when the gas went in.
- 26:27No, I was talking about the utility
- 26:28pole.
- 26:29>> Oh, the utility pole.
- 26:30>> Yeah.
- 26:31>> Um, no, that's been there. That's how
- 26:33they've always got electric. And that
- 26:34actually really doesn't come into play.
- 26:36Luckily for us, the the the overhead
- 26:38utilities are already well split. The
- 26:41only item that we have is the
- 26:43underground gas that requires an
- 26:45easement through lot two to attach to
- 26:47lot one.
- 27:06relatively straight.
- 27:09>> Okay.
- 27:10And you do need to do the waiver check
- 27:14set back
- 27:16just so you understand it's a 10 foot
- 27:19rear setback and so in making the United
- 27:27Street
- 27:31versus the T. Also, one thing to uh
- 27:35speak on on the waiver is um in terms of
- 27:37contextual for that neighborhood, 10
- 27:41foot would be less contextual than what
- 27:43we're asking for based upon the fact
- 27:46that the Delaware and Hudson canal lots
- 27:47are obviously very congested. You know,
- 27:49the houses are some of them are are in
- 27:52this neighborhood. There are many
- 27:53structures which are party ball lines.
- 27:55So, there's no setbacks whatsoever. So,
- 27:58in terms of the overall look and
- 28:01context, um, this fits with the overall
- 28:04look of the neighborhood. There's
- 28:06nothing outlined here that's saying, "Oh
- 28:07my god, there's only a short amount."
- 28:09Everything is a short amount in that
- 28:11neighborhood, specifically those few
- 28:13streets in that block. Uh, you have some
- 28:15tight buildings in there. Um, that's
- 28:18probably how they got built together on
- 28:20one lot in the first place.
- 28:23So the one of the houses faces here and
- 28:27one of them faces here and so the line
- 28:31is the correct or the setback is coming
- 28:35in here and it's been indicated by fire
- 28:38department that's make them safely.
- 28:43[clears throat]
- 28:44>> So just to give you a better idea also
- 28:46like here I know you're talking about
- 28:48the front. So here's the picture of the
- 28:50house fronting on German. So we have
- 28:52this white frame structure here is the
- 28:54house fronting on ridge the brick
- 28:56structure and then this is the spacing
- 28:59between. So we have a 5ft spread coming
- 29:01down through here to get these two. So
- 29:03there's still walkable area on both
- 29:05sides of the boundary line. And that
- 29:07easement that I show is right here going
- 29:09in. The gas line comes in. You can see
- 29:11the gas meter on the house right there.
- 29:13>> And then this is actually our
- 29:15neighboring house right here. So again,
- 29:17the lots are tight in this area. Um but
- 29:20that is these are the does
- 29:22>> that have anything to do with it being a
- 29:23dead end?
- 29:24>> No, that's just that's a separately
- 29:27separate deed in property on the end of
- 29:28the block.
- 29:31>> That is just potential any
- 29:35system.
- 29:42All right. The applicant has included a
- 29:44waiver request that clearly identifies
- 29:46and describes the waiver being proposed
- 29:49accompanied by plans and other visual
- 29:51representations as applicable.
- 29:54>> Yes.
- 29:56>> In their letter, the applicant describes
- 29:58in detail why the waiver is needed and
- 30:00how the waiver request is consistent
- 30:02with the intent, design, and
- 30:03compatibility of the transsect zone in
- 30:06which the project is located.
- 30:08>> Yes.
- 30:08>> Yes.
- 30:10Will granting the waiver contribute to
- 30:12the realization of the overall intent of
- 30:14the transex zone and result in improved
- 30:17project which will be an attractive and
- 30:19durable contribution to the transex
- 30:21zone.
- 30:24Okay.
- 30:28>> To support walkable neighborhoods and or
- 30:30mixed use centers. The project emulates
- 30:32the neighborhood context for how far the
- 30:34building buildings relate to the
- 30:36sidewalk, how the facade is designed,
- 30:39and how the building interacts with the
- 30:41street.
- 30:44>> Yeah, these are existing.
- 30:46>> Yes. project supports a green and
- 30:49resilient future by for example reducing
- 30:52vehicular miles traveled, providing
- 30:54green infrastructure, indoor street
- 30:55trees and/or including high quality
- 30:58usable open space and
- 31:03project supports development patterns
- 31:05such as size and density and supports
- 31:07infill development or the reuse of
- 31:09existing buildings.
- 31:13project supports the provision of a
- 31:15variety of housing types to support a
- 31:17range of income levels, age groups, and
- 31:20family units.
- 31:24Project specifies street design that is
- 31:26walkable, bikable, and will reinforce
- 31:29safe and comfort comfortable
- 31:31environments for all users.
- 31:36>> Okay. So that approved.
- 31:42>> I will point out one thing. I don't have
- 31:44a policy six on this map. Uh just as
- 31:47it's been going back and forth between
- 31:48the building and planning department,
- 31:50but we'll add that as we get more.
- 31:53So
- 31:56with uh
- 32:04this looks to be completion
- 32:09[clears throat]
- 32:15to accept the short environmental
- 32:17assessment board.
- 32:18>> Make a motion to accept.
- 32:20>> I second. Vince.
- 32:23All in favor?
- 32:25Opposed?
- 32:41And then um so the motion would be for
- 32:46uh approval of the line on the
- 32:49subdivision with board policy six
- 32:52including the major waiver with their
- 32:54setback uh submission of five paper and
- 32:57one line copies uh written descriptions
- 33:01for filing including the easements uh
- 33:03within in those descriptions and all
- 33:06signed by the owner before the
- 33:07chairman's signature.
- 33:11>> Motion
- 33:14second
- 33:18all approved.
- 33:22>> Okay.
- 33:22>> Good.
- 33:23>> So, thank you. And Sue, if you want to,
- 33:26you know, in when you have time in an
- 33:27email or whatever, um, lead me to where
- 33:30you want me to go next. I know we talked
- 33:31about the building department having to
- 33:34approve of of the subdivision after the
- 33:36subdivision approved. So, um if it's
- 33:39dropping these off or an email copy or
- 33:41whatever to get teaching moving forward,
- 33:43please advise.
- 33:45>> Thank you everybody.
- 33:46>> Thank you.
- 33:47>> Have a good night.
- 33:53>> All righty. So,
- 33:56>> yep. So item five, 298 to 300, 302 to
- 34:00318, 392 to 306 Old Boulevard, 262
- 34:05Boulevard, 43 to75 Albert Street
- 34:08extension, 308 to 318
- 34:12uh R Boulevard, 45 to 49 Condi Street,
- 34:16lot line revision to combine seven lots
- 34:19into three, SPL56.48-2-700
- 34:2248-2-7.100
- 34:25and 7.200 200
- 34:288 9 1000
- 34:3211 and 12 secret of termination
- 34:37type two transex zone T3 N-0 war 9 P and
- 34:43D group LLC is the applicant owner so
- 34:47>> good evening
- 34:48>> welcome Paul Arios uh from Baneer and
- 34:51Arios our firm I'm representing the
- 34:53applicant Jaffer of the D&D group.
- 34:57>> Um, our firm did the survey and
- 34:59subdivision work.
- 35:01>> He's putting it up.
- 35:04>> I don't know [clears throat] if that
- 35:06wants these.
- 35:07>> They have them in their notes. So,
- 35:27They do have a copy in my house. Do you
- 35:29want to start? It's just
- 35:31>> So the owner applicant uh owns a total
- 35:34of eight lots here uh adjacent lots. One
- 35:38of them uh this one here that fronts 32
- 35:42will remain the same. Uh the other seven
- 35:44lots will be essentially consolidated
- 35:48into three lots for a total of four
- 35:51total lots
- 35:53uh essentially to accommodate for
- 35:56potential future development of uh these
- 35:59lower lots.
- 36:01Uh I believe we're seeking two major
- 36:04waiverss
- 36:05uh for exceeding the maximum lot width
- 36:08and lot depth.
- 36:10These dimensions were already
- 36:14exceeding the lot width and depth as in
- 36:18their current state. But as the go of
- 36:20creating the new lots under the new
- 36:22zone, the waiver is required.
- 36:30>> So they existed
- 36:32outside what is current names on each
- 36:36other. Correct. Well, there's multiple
- 36:38laws. So what they're doing is kind of
- 36:42shifting property lines, consolidating
- 36:45from 7 to three,
- 36:47>> right? Um the if you're familiar with
- 36:51the location where uh Denver Electric is
- 36:54located um the business will stay
- 36:58primarily they're consolidating those
- 37:00upper lots on the top portion
- 37:04>> be deleting lot lines here
- 37:06>> and then
- 37:08>> and down below they're shifting one over
- 37:10to create two new lots that will be
- 37:14primarily I guess developed as
- 37:16residential new resial housing parcels.
- 37:24So, they'll be accessed off of book
- 37:26Albert and Condandy Street.
- 37:33>> So, the the the waiver ask is based on
- 37:39>> the current lots do exceed that wick and
- 37:42depth. Um, so it's not really u it's
- 37:46it's not like the subdivision uh made
- 37:49these lots much larger.
- 37:51>> So the poor the poorbased code has
- 37:54maximum depth and maximum widths, right?
- 37:58And so just by shifting a line it could
- 38:02be two of those dimensional
- 38:05requirements. So they do the the
- 38:08waiverss in order to exceed those
- 38:10dimensional requirements on the lower
- 38:12portion
- 38:14>> but it's just in relation to the actual
- 38:15property. It's not because of the
- 38:17structure.
- 38:18>> Correct. Yeah. There's no structures
- 38:20where they are going to be new
- 38:21buildings, new houses. So if you out of
- 38:25an existing
- 38:27line that now falls under
- 38:32not being compliant under the formbbased
- 38:35code now what would be the issue in
- 38:37making it compliant with the current
- 38:40form based code
- 38:44>> meet multiple small
- 38:47>> I think because they're combining
- 38:49parcels
- 38:50>> they're adding they're adding properties
- 38:53together, we're creating larger two
- 38:56larger parcels on the lower section and
- 38:59one parcel on the upper section. So by
- 39:02combining all of the properties
- 39:04together, the lower the lower parcels
- 39:06exceed the dimensions.
- 39:09>> Yeah. Cuz it's 100 ft wide.
- 39:11>> It's the it's just the nature of the the
- 39:14property.
- 39:16>> Yeah.
- 39:18>> Very large. Yeah.
- 39:21And then the depth is 180 ft. This goes
- 39:24past those because of taking multiple
- 39:27small combiners. I told fewer larger
- 39:30lots
- 39:37>> questions
- 39:41the checklist.
- 39:43>> Yes, you should.
- 39:50No, I only want do we?
- 39:53>> Yeah. One for both because they're both
- 39:55dimensional.
- 39:57>> All righty. Uh, the applicant has
- 40:00included a waiver request that clearly
- 40:02identifies and describes the waiver
- 40:04being proposed accompanied by plans and
- 40:06other visual representations as
- 40:08applicable.
- 40:09>> Yes.
- 40:11In their letter, the applicant describes
- 40:13in detail why the waiver is needed and
- 40:15how the waiver request is consistent
- 40:17with the intent, design, the
- 40:19compatibility of the transex zone in
- 40:21which the project is located?
- 40:23>> Yes.
- 40:26>> Granting the waiver will granting the
- 40:29waiver contribute to the realization of
- 40:30the overall intent of the transct zone
- 40:32and result in an improved project which
- 40:35will be an attractive and durable
- 40:36contribution to the transct zone.
- 40:40Yes.
- 40:42>> To support walkable neighborhoods and or
- 40:44mixed use centers, the project emulates
- 40:47the neighborhood context for how far the
- 40:49building buildings relate to the
- 40:51sidewalk, how the facade is designed,
- 40:53and how the building interacts with the
- 40:54street.
- 40:58Project supports green and resilient
- 40:59future by for example reducing vehicular
- 41:02miles traveled, providing green
- 41:04infrastructure and/or street trees
- 41:06and/or including high quality usable
- 41:08open space.
- 41:13>> Project supports incremental development
- 41:16patterns in its size and density and
- 41:18supports infill development for the
- 41:20reuse of existing buildings.
- 41:24>> Yes.
- 41:26your prices
- 41:31usually just the building. It's one
- 41:33building.
- 41:34>> It's or though
- 41:35>> is that
- 41:36>> it's um
- 41:38supports infield development or reuse of
- 41:41existing.
- 41:42>> Yes.
- 41:45>> Project supports the provision of a
- 41:47variety of housing types to support a
- 41:49range of income levels, age groups, and
- 41:52family units.
- 41:55project specifies street design that is
- 41:57walkable, bikable, and will reinforce
- 41:59safe and comfortable environments for
- 42:01all users.
- 42:08>> So that's approved. So now motion to
- 42:11accept.
- 42:12>> All right. Motion, Andrew. Who would
- 42:15like to second? Vince.
- 42:18Um
- 42:20all in favor? No opposed?
- 42:25This cast
- 42:42almost there.
- 42:54I think five
- 43:00policy six
- 43:03um and the waivers approved um regard by
- 43:08paper copies my uh written instructions
- 43:12will need to be submitted and the result
- 43:14parcels and the final will need to be
- 43:17signed by the own chairman and then by
- 43:21the planning board with all the
- 43:25>> paper.
- 43:32>> Okay. So, a motion kind
- 43:36Andrew. All in favor? Opposed?
- 43:50Second off
- 44:26Up next, item 6, 40 Thomas Street,
- 44:30public hearing for administrative
- 44:31special permit renewal to operate an
- 44:34emergency shelter SPL56.25-4-44.
- 44:40Seeker determination miss
- 44:42>> type two
- 44:43>> type two transex zone T5F ward 5 family
- 44:48Woodstock applicant owner
- 44:51so
- 44:52>> this is basically public hearing that
- 44:55you're holding um no one
- 44:59>> anyone have to speak
- 45:04>> hearing is now closed
- 45:08okay
- 45:10Okay.
- 45:11>> All right. Item number seven, 25 Fields
- 45:14Court site plan and waiverss to
- 45:17construct a miss mixed use building with
- 45:20commercial on the ground floor and
- 45:22residential above SPL56.25-3-25
- 45:28secret of termination. This one suit
- 45:33this will be
- 45:36>> this will be a type two seeker
- 45:38determination transex zone T5F ward 4
- 45:42teeth libold applicant city of Kingston
- 45:45owner.
- 45:46So welcome votes.
- 45:48>> It's public hearing. So there's anybody
- 45:50from the public that wants to speak on
- 45:52this?
- 46:02Mike.
- 46:05[laughter]
- 46:07>> Okay. If we could introductions for the
- 46:10record, please.
- 46:11>> Sure. Good evening. My name is Michael
- 46:12Lante. I'm the product engineer for this
- 46:14application for the board and I'm here
- 46:16with Mr.
- 46:18Development team.
- 46:19>> Okay.
- 46:21>> She's online. Is she going to
- 46:25>> She is. She can. She she's
- 46:28>> here and I'm happy to share screen by
- 46:31these two. I'm not sure what what
- 46:33everyone prefers.
- 46:39>> Welcome folks. Would you like to just
- 46:41walk us through?
- 46:42>> Sure. Um I brought hard copies
- 46:46on screen. You want to bring up the
- 46:49site?
- 47:03Can everyone see the screen?
- 47:05>> Yeah,
- 47:06>> that's great.
- 47:08>> Okay, so as you noted earlier, uh the
- 47:11site location is 25 Field Court. It's at
- 47:13the end of Field Court on this side and
- 47:16near the intersection of O'Neal Street,
- 47:18Midtown Linear Park at that location. Um
- 47:21the existing site actually consists of
- 47:23an abandoned commercial building. Um the
- 47:26entire site is paved or impervious
- 47:30through use of the building. Uh we're in
- 47:32the T5 um flex zone for this particular
- 47:35project and we're proposing 71 units
- 47:38with five stories. It's got an attic and
- 47:40a partial basin. Uh we are seeking uh
- 47:43waiverss uh as a part of this project.
- 47:4640516
- 47:48E3, 40516F,
- 47:50and 4056DJ
- 47:53respectively. We're also proposing um 35
- 47:57parking spaces. Stands, you can stay on
- 47:59the site there pretty much. Um we're
- 48:01proposing 35 parking spaces and we've
- 48:04designed stormwater detention areas in
- 48:07this portion of the lot and under the
- 48:09parking space over here and that portion
- 48:12of the lot. Um so outside of those
- 48:14waiverss that we're requesting, it
- 48:15appears that the project's fully zoning
- 48:17compliant.
- 48:19Um we prepared landscaping plan,
- 48:22lighting plan, broader details that go
- 48:25along with it.
- 48:27That's basically the project in a nutsh
- 48:33meeting and then incorporate the
- 48:35comments from the last meeting and this
- 48:36meeting and have those turned fairly
- 48:38quickly. you've addressed most of what
- 48:41percent
- 48:43or
- 48:44>> so you got your staff's comments back
- 48:47and obviously we just received the
- 48:50county board comments
- 48:53you've seen those
- 48:55um they've been posted online as well so
- 49:00have you had a chance to take a look at
- 49:03them and give consideration or any
- 49:06thoughts on I know one of them was
- 49:08pedestrian and access egress be for to
- 49:13me street. Another one was to um and I
- 49:17don't know this had an opportunity to
- 49:19look at those as well. that came in
- 49:20Friday.
- 49:21>> But another one was to provide for some
- 49:24additional uh visual um concept uh
- 49:30drawings to show the evening and daytime
- 49:34and shadowing um impacts that could
- 49:37potentially lead to the um green line
- 49:40along the halfway there. Um as you look
- 49:44at that,
- 49:44>> well, I thought we kind of submitted
- 49:46that. I was a little confused by that
- 49:47when we taught it because we gave the
- 49:49visuals of all four sides of the
- 49:51building and we gave visuals of sort of
- 49:54a sunset. It will
- 49:55>> I remember that.
- 49:56>> Yeah. and it will cast a shadow at
- 49:58certain times of the day. And so
- 50:01>> it's right up against the
- 50:03>> I think one of the things that the board
- 50:05is going to be interested in seeing are
- 50:08um a little bit more of the
- 50:10architectural detail in to the visual
- 50:15simulations as well as some nighttime
- 50:17renderings.
- 50:19um some of the the renderings that were
- 50:21provided you know leave a lot of
- 50:24question about window treatments and and
- 50:27materials
- 50:28um and that so I think a little bit more
- 50:32detail on those would be helpful in a
- 50:35planning evaluation in terms of what
- 50:38it's going to look like from different
- 50:40vantage points not only from the rail
- 50:43line but from the adjoining streetscape
- 50:46um would be good
- 50:47>> what I'd like to do is provide But um
- 50:49you know it doesn't render the the
- 50:51building details well when you reduce
- 50:53the scale so much. So I blew it up and
- 50:56maybe if I showed you a section of each
- 50:58so you can kind of get a feel for the
- 51:00actual
- 51:01>> Yeah. See like the cortises the sills
- 51:04the lentils they're building material up
- 51:07facade but just those little details.
- 51:10>> No I understand we were just talking
- 51:12about that today that you really you
- 51:14can't you just can't see that scale. Uh
- 51:17the first floor is planned to be brick
- 51:18and then the up floors would be various
- 51:20types of concrete siding and even the
- 51:24color. There's variations throughout
- 51:25that two-tone, three tone, whatnot.
- 51:28>> Yeah,
- 51:29>> I think a night a nightcape or night.
- 51:31>> You want a nightcape as well?
- 51:33>> Yeah, I think so.
- 51:33>> We did one there's one rendering of uh
- 51:36we did at sunset
- 51:39of the main night. I see.
- 51:41>> Hey Stannis, do we have that one
- 51:42rendering that shows the building at
- 51:44sunset at the entrance? Yeah, we
- 51:47actually have [snorts] we did uh daytime
- 51:50and nighttime views for each view.
- 51:54>> Yeah. I think the problem is at that
- 51:56scale we can't see they can't see the
- 51:58details of them.
- 51:59>> Yeah. So in that in that rendering there
- 52:02like the the windows just like black.
- 52:06>> No, I understand.
- 52:07>> They don't.
- 52:08>> Yeah.
- 52:10Yep.
- 52:15>> Yeah. And the color changes are subtle.
- 52:17It doesn't it doesn't render well on
- 52:19this. Um can you go up one, Standish?
- 52:23We didn't do virtual renderings of
- 52:25different color patterns, but there is a
- 52:27few different uh
- 52:29>> so I also think putting putting the
- 52:32project into the context of the
- 52:36neighborhood and the enjoying buildings
- 52:38rather than having it as a standalone
- 52:42type of
- 52:42>> Yeah. Okay.
- 52:44>> visual. [snorts]
- 52:45um would be helpful.
- 52:52>> Well, again, I wanted to hear that
- 52:55tonight. That's going to be a very
- 52:57specific shape to that. the rest of the
- 53:01elements including
- 53:04>> should have
- 53:07>> I think the light from the building is
- 53:08actually going to help that part of
- 53:11Broadway because on Broadway is so
- 53:13bright but then just right back it's
- 53:17very dark. So
- 53:21seeing it from that perspective too is
- 53:23only going to show and demonstrate what
- 53:25kind of difference there is with all
- 53:27that additional light.
- 53:34Yeah.
- 53:36>> Can you go back to the plan?
- 53:49Now with during construction, what's the
- 53:52plan for staging materials?
- 53:55How do you anticipate that? Well, sure.
- 53:59We're going to utilize the uh parking
- 54:01area, stage materials, and then once the
- 54:04building's up, we'll then focus on
- 54:07building the parking area out the
- 54:09construction work. goes in parking mis.
- 54:13>> You also have this open area back here
- 54:15which before the structure goes up can
- 54:17store materials as well
- 54:22>> security. What do you have planned for
- 54:24that?
- 54:25>> Um we have to fence the site in and we
- 54:27have to we'll have some cameras up which
- 54:29are far
- 54:34twice so can have those.
- 54:37>> Okay. But we will have a we're going to
- 54:39do a just a plan in which we've gusted
- 54:42still plan on the show staging. I mean
- 54:45it's kind of easy on this site because
- 54:46it's already
- 54:48so you know we kind of have a nice
- 54:51surface.
- 54:52>> Yeah. Jump start because you know you
- 54:55use the aring areas lay down the arc for
- 54:57the building and then as the building
- 54:59goes up um you'll switch over and do the
- 55:02site work when they finish the inside of
- 55:04the building. So with most of your
- 55:06activity going on to field port um with
- 55:10construction and this presuming most of
- 55:13your materials and and the construction
- 55:15activity will get in and out of field
- 55:17boards. How are you thinking of any
- 55:21traffic control um at Broadway because
- 55:24that's that's a tough exit out there for
- 55:29traffic signal
- 55:30>> normal traffic and like we're going to
- 55:32have larger vehicles and construction
- 55:34vehicles going in and out. Do you have
- 55:38any thoughts about that?
- 55:40>> We'll look at it. We plan no more than
- 55:43two deliveries a day. So I don't I don't
- 55:45think that's going to be a huge impact.
- 55:47we can
- 55:48>> once the foundation's in place um the
- 55:52the oneway lane going through O'Neal
- 55:54will be open so we'll have during
- 55:57construction that can be that can go in
- 55:59either direction so we'll have the
- 56:01ability to come to that line
- 56:04>> um if you know if there is if there is
- 56:07an occasional long body truck that has
- 56:10to get in there it's probably going to
- 56:11want to come on that O'Neal side and
- 56:13we'll have to shuttle things like
- 56:15>> okay
- 56:16>> wood six would come in on that side of
- 56:18the building.
- 56:20And then we had talked to you about the
- 56:22parking um supply and demand reduction
- 56:26strategy working on that
- 56:27>> is being completed with
- 56:30>> okay
- 56:32existing studies in town to that study
- 56:35and those solutions
- 56:39>> the existing union that's happen court
- 56:42including the pickle ball is that going
- 56:45to be something that's going to have to
- 56:47come to halt for two years while this is
- 56:48be developed or is there a way for them
- 56:50to paint those programs?
- 56:52>> I hope
- 56:54>> I know that the heart
- 56:56is
- 56:57>> heart of Midtown happens on field and
- 57:00then also the pickle balls becoming more
- 57:03popular.
- 57:04>> Yeah.
- 57:05>> Yeah. We did want to talk about I think
- 57:07that third entrance tonight
- 57:10court. Um, we were wanting to have that
- 57:13be a dual entrance, but a safety
- 57:16entrance for snow removal in the winter
- 57:18if we have to duck snow off the site.
- 57:20Um, because there isn't a lot of snow
- 57:22load here. And um, in in case we get a
- 57:27an accident or something that prevents
- 57:30the access onto O'Neal, you had a way to
- 57:33circute
- 57:37that. It's funny. We thought I I thought
- 57:40we had discussed that early on that was
- 57:42something the board was openly
- 57:44considering. I had to remove it, but
- 57:48um it's it's important from access
- 57:51standpoint. Yeah.
- 57:52>> Alone because otherwise we literally
- 57:54have one way traffic through the site.
- 57:56So one way is never the safest. I mean,
- 57:59it would be the best if we could put
- 58:00some type of a, you know, gate with a
- 58:02bar that raises um so that if we need to
- 58:05have um residents or anyone that exits
- 58:07the site and moving lead out of O'Neal,
- 58:10we can get out the field court as well.
- 58:11And then also, as Keith noted, it
- 58:14assists us in a little bit
- 58:20as far as the parking landscape. Um,
- 58:23would the board like to see a like a
- 58:27stone wall along the field horn face
- 58:30along the green sections
- 58:32to
- 58:34that way? We could come up with like a
- 58:3630-inch wall with stone face and a cap
- 58:38that would be at least double as a
- 58:40sitting bench as well as a
- 58:42>> say in in terms of combining those
- 58:46activities that generally take place
- 58:48there the general public. It might be
- 58:50nice to maybe incorporate your, you
- 58:52know, combination of the seating element
- 58:55with with your landscaping
- 58:58uh requirement to, you know,
- 59:00>> what sort of what would you see along
- 59:03here? Cuz we we were thinking about
- 59:04doing like where these green spaces are
- 59:09uh here, here, and here. Doing a like a
- 59:14concrete wall and stone veneer path and
- 59:16it would be like a sitting bench. So,
- 59:19it's going to be great.
- 59:20>> Kind of acts as a a visual break. It
- 59:23meets the
- 59:24>> desire of the code,
- 59:26>> but it's also very functional. People
- 59:28are there. They can actually just sit on
- 59:29it,
- 59:30>> especially if they're picking and feel.
- 59:32>> Yeah.
- 59:34>> You could also have like a a trash
- 59:36receptacle to the people there playing,
- 59:38but ultimately have something to throw
- 59:40away. It's not worth to just have a
- 59:43meeting in Sky.
- 59:46>> There were um some comments
- 59:48>> the need for that waiver.
- 59:51>> Yeah.
- 59:51>> Okay. Yeah.
- 59:52>> Yeah. Yeah.
- 59:53>> So, there were some comments received
- 59:55from the CC as well.
- 59:57>> I saw that.
- 59:58>> You saw those as well. So, we're going
- 59:59to need to have them address those.
- 1:00:02>> Sure.
- 1:00:02>> Um in your final response for for
- 1:00:04November meetings.
- 1:00:05>> Okay. Um what one of the other parking
- 1:00:08comments was the the setback from the
- 1:00:10parking from the property le 2 ft versus
- 1:00:125t. Um that is a waiver we'd be seeking
- 1:00:15because I think it allows us an extra 1
- 1:00:192 3 four parking spaces
- 1:00:21>> and there's already a shortage of
- 1:00:22parking in the city of the site. So, um
- 1:00:25it's a it's a small waiver request from
- 1:00:272 ft to 5 ft plus. I think the addition
- 1:00:29of this um landscape wall will provide a
- 1:00:34nice separation between the parking lot
- 1:00:36um and field court which will add to the
- 1:00:38I think board's consideration of that
- 1:00:40later.
- 1:00:45We spoke with the landscape architect
- 1:00:47seeing what work heard before they
- 1:00:50started their on
- 1:00:53>> right
- 1:00:54>> together.
- 1:00:56>> Yeah, I believe he's working with Korean
- 1:00:59>> on final plan.
- 1:01:00>> Yeah,
- 1:01:01>> the third the third wave I think was the
- 1:01:03elevation difference between the first
- 1:01:05floor
- 1:01:06>> I mean
- 1:01:06>> and the grade. Yeah,
- 1:01:08>> the accepted. Okay. So, I didn't discuss
- 1:01:10that, but just from an ADA entrance
- 1:01:12compliance, we'd absolutely move that.
- 1:01:21>> I guess you want us to continue to
- 1:01:22pursue with the extra curve cut
- 1:01:26>> with the
- 1:01:28>> what?
- 1:01:29>> The extra curve cut will remain, but
- 1:01:30we'll have a gate for emergency access.
- 1:01:32That's my
- 1:01:34>> How does the board feel about that
- 1:01:36though?
- 1:01:37Well, the word there still is going to
- 1:01:39be a waiver for the second curve.
- 1:01:41>> Yes.
- 1:01:41>> Yeah. Yes.
- 1:01:45>> Yeah. I think maybe not a lot easier
- 1:01:48just and still retains access.
- 1:01:51>> Yeah.
- 1:01:51>> I think it's the best of the reports.
- 1:01:54>> I agree.
- 1:01:56Okay.
- 1:02:02The board have any other questions?
- 1:02:11comments between the city engineer at
- 1:02:13the end of
- 1:02:14>> I sent him an email today reminding him
- 1:02:17that we are looking for his comments. So
- 1:02:20hopefully I will keep pushing you
- 1:02:24>> but yeah
- 1:02:24>> I said about peing at the end. Yeah. And
- 1:02:27uh I mean the water department has
- 1:02:29essentially looked at your drawings GPW
- 1:02:33revision. So you've gotten their
- 1:02:35feedback
- 1:02:37and
- 1:02:42>> board have any other comments?
- 1:02:44>> What else?
- 1:02:47>> Okay. So anything
- 1:02:49about the marching voters?
- 1:02:51>> Are we leaving the public open?
- 1:02:55>> Sorry. Are they leaving the public
- 1:02:56hearing open?
- 1:02:58>> Um,
- 1:03:00do you want to leave the public hearing
- 1:03:02open or do you want to close it?
- 1:03:04>> I would leave it open.
- 1:03:06>> Yeah.
- 1:03:06>> Okay. I would leave it open for now.
- 1:03:08>> Okay.
- 1:03:12[clears throat]
- 1:03:14>> So,
- 1:03:17what's
- 1:03:27Motion.
- 1:03:28Make
- 1:03:29>> motion to table this and keep the public
- 1:03:31hearing open until next moment. Andrew's
- 1:03:33motion. Second. Kyra.
- 1:03:37All in favor? Opposed.
- 1:03:40Okay.
- 1:03:48>> And at the time of the 76.
- 1:03:51>> Okay. Right. Thank you.
- 1:03:54Thank you.
- 1:04:07>> And let the record show that saved you.
- 1:04:10New Kirk has arrived. Will be
- 1:04:12participating.
- 1:04:15>> Don't lose our time. Go away again.
- 1:04:19>> Did they win? They won. One to zero.
- 1:04:22We're not
- 1:04:24>> correct
- 1:04:35or something.
- 1:04:45Number eight.
- 1:04:57Okay. Item number 8, 350 Broadway site
- 1:05:00plan to construct an addition to an
- 1:05:02existing building and establish 10
- 1:05:03residential units. SPL56.26.11-4900
- 1:05:10seeker determinations.
- 1:05:13So
- 1:05:14>> this one is I think T2
- 1:05:18uh Transexo T5 MS W9 Diane Chen is the
- 1:05:24applicant 350 Broadway Kingman LLC owner
- 1:05:28welcomes
- 1:05:30we just names for the record please.
- 1:05:31Good evening, Dian Chen. As we said, um
- 1:05:35here's Mike Shiloh, my GC builder. So,
- 1:05:39I'm going to turn everything over to
- 1:05:41him. [laughter]
- 1:05:43>> Well, if you just want to give us a
- 1:05:44quick walk through. Sure.
- 1:05:46>> Pulling up the screen. So,
- 1:05:48>> you guys are probably familiar with the
- 1:05:50property because it's been on the
- 1:05:51planning board previously with the grant
- 1:05:53on seven units. When Diane bought the
- 1:05:56property, it was shown at seven units,
- 1:05:58but it would never qualify for um a
- 1:06:01building permit because the two adjacent
- 1:06:04lots, even though they're lower, didn't
- 1:06:06allow proper fires because there was no
- 1:06:09way they had multiple bedrooms. During
- 1:06:11this process, we discovered that the
- 1:06:13second and third floor roofs are in
- 1:06:16total need of replacement. And we talked
- 1:06:18to our local architect Charlie Wesley
- 1:06:20and looked at the feasibility of of just
- 1:06:23removing down to the second floor and
- 1:06:24going back up over the existing
- 1:06:26footprint and closing the entire
- 1:06:28footprint to make the building code
- 1:06:31compliant. We could only fit studios
- 1:06:32like when you get one bedroom if we
- 1:06:35closed off then we wouldn't be fired. So
- 1:06:37we figured out that we can keep the same
- 1:06:38bedroom count but get 10 units versus
- 1:06:41the seven that were originally planned.
- 1:06:46project has three affordable units as
- 1:06:49part of this scope. Um we will be
- 1:06:52looking for a handicap spot on the
- 1:06:54street because there are 10 originally
- 1:06:57property was being marketed with heated
- 1:07:00parking in the rear and found out spots
- 1:07:02aren't heated accurate of the property.
- 1:07:04So the originally planned handicap
- 1:07:06parking in the back is not feasible
- 1:07:08anymore. So we either would like to do
- 1:07:11right in front of the property or paint
- 1:07:13and stripe one across the street and
- 1:07:15we'll miss it belong. If this city would
- 1:07:16do a little bit further, you know, it
- 1:07:18doesn't matter to us. In the rear of the
- 1:07:20property, we are going to have access
- 1:07:22for a full garbage containment as well
- 1:07:24as enclosed bicycle enclosures so that
- 1:07:28we can fit probably one bike for most of
- 1:07:30the tenants. Even though we're only
- 1:07:31required to have two, we're going to
- 1:07:33make it available for everybody's use.
- 1:07:36And we're not changing footturn of the
- 1:07:38property at all. That's rear of the
- 1:07:40property. So, Broadway facing side will
- 1:07:42still look the same. Actually, look
- 1:07:44better because it'll have windows
- 1:07:45finally.
- 1:07:47I'll answer any questions board has. So,
- 1:07:50when you had mentioned about the back of
- 1:07:51the property with the [clears throat]
- 1:07:54trash receptacles and all of that. So,
- 1:07:56the last time it was here, there was an
- 1:07:58easement [clears throat]
- 1:07:59to access the the easements
- 1:08:02non-existent. They never registered it
- 1:08:03when the hospital the original Kingston
- 1:08:05hospital sold the property or the
- 1:08:07easement. The previous owner never got
- 1:08:10that documented on the deed and
- 1:08:12unfortunately it didn't transfer over to
- 1:08:14us. It's not not there. Worst case
- 1:08:17scenario, if and when the hospital
- 1:08:18decides to do something with that lot,
- 1:08:21we can take the garbage that we have
- 1:08:23there and walk it through our ground
- 1:08:24floor corridor and and put it out front
- 1:08:26when our garbage dumpster comes. So
- 1:08:28right now we'll have an enclosure with
- 1:08:30store 4yard container which the dumpster
- 1:08:33company come in open gates pull it out
- 1:08:36dump it put it back in it closed up it
- 1:08:38but and it's not visible we do have a
- 1:08:40small section in the back which we're
- 1:08:42going to make still keep retain the
- 1:08:44originally planned decks and there will
- 1:08:47still be an access point on the back of
- 1:08:49the property so that you in essence can
- 1:08:51walk through through the front and
- 1:08:53that's our main ADA compatibility.
- 1:08:56>> Okay. We also plan on marketing the two
- 1:08:58ground floor apartments as ADA. We're
- 1:09:00required to have one, but we're making
- 1:09:02build ADA accessible.
- 1:09:04Okay.
- 1:09:08>> Now, with the change of the facade on
- 1:09:10the front of the building, first floor,
- 1:09:13this is existing.
- 1:09:15>> Yeah, it's we're not changing anything
- 1:09:17on the facade on the front floor.
- 1:09:18There's an existing roofing canopy.
- 1:09:20We're just going to re- roof it cuz it's
- 1:09:22not in good shape. So this is the rear
- 1:09:24of the property and it had stuckle and
- 1:09:27siding. It had a mish mash of different
- 1:09:29things. So we're going to use a hardy
- 1:09:30plank 9 in white standard look. The
- 1:09:33bottom will retain its masonry on this
- 1:09:35side. The masonry goes up and over here
- 1:09:37it's a wood structure to the top.
- 1:09:40>> But you you were going to enclose that
- 1:09:42front little al cove.
- 1:09:44>> Yes. Oh my god. I totally forgot about
- 1:09:46that. So, right now we have a homeless
- 1:09:48person that likes to use our spot. And
- 1:09:50what we decided to do is bring that
- 1:09:53space towards the street more. We'll
- 1:09:55probably leave it within a foot of its
- 1:09:58of the property line so that we can
- 1:10:00still keep the willp box for the fire
- 1:10:02departments and have their access to it,
- 1:10:04but it would also serve as a wind entry
- 1:10:06for the retail when we rent it out
- 1:10:09>> and eliminate the homeless person
- 1:10:10sleeping there. And then with uh
- 1:10:13mailboxes,
- 1:10:14>> mailboxes right now we have two options.
- 1:10:17One is right here on a sliver just a
- 1:10:19built in. We might make the wall wider
- 1:10:21or right now it's programmed. You walk
- 1:10:23into the corridor and there'll be 10
- 1:10:25mailboxes plus a commercial for the mail
- 1:10:28department to use
- 1:10:29>> in reset inside the wall.
- 1:10:31>> Okay. That would be inside the left.
- 1:10:33>> Inside the left door. Yes. There'll be
- 1:10:35secondary door there. So the mailman can
- 1:10:36get in but he can't go beyond the
- 1:10:38problem.
- 1:10:38>> Okay.
- 1:10:39>> Um if you go to the planet he show it to
- 1:10:41you. And the first floor apartments
- 1:10:43their access from behind.
- 1:10:45>> No, you actually have entrance from the
- 1:10:46front. Okay. If you go to the the
- 1:10:49section that has
- 1:10:51so you would walk in here
- 1:10:54>> and you have a corridor here to this
- 1:10:56unit and you can go to this one, but
- 1:10:58they also have access from the rear if
- 1:11:00you want to. Yeah.
- 1:11:08because we couldn't bank on having this
- 1:11:10always available for handicap entry. We
- 1:11:13originally weren't programmed to have a
- 1:11:15lift there. We ever lose access to that.
- 1:11:17We had to maintain this corridor and we
- 1:11:19had to sacrifice some of this space
- 1:11:21which originally was part of the retail.
- 1:11:22But by doing so, we've maintained access
- 1:11:25in all scenarios
- 1:11:26>> and it's just one retail.
- 1:11:28>> One retail. Okay.
- 1:11:30existing
- 1:11:32750ish square ft.
- 1:11:42Now another question since this takes up
- 1:11:45most of the footprint and there is no
- 1:11:48easement in the back how will
- 1:11:50construction stage with materials and
- 1:11:52equipment and
- 1:11:54>> I can bring everything in through here
- 1:11:56or boom it in.
- 1:11:58We don't have like machines booms to
- 1:12:00bring
- 1:12:01>> when I get I'll have a delivery of
- 1:12:03drywall. That's our biggest item really
- 1:12:04to come in and some 2x4s so we can stage
- 1:12:07it right through the windows. Um I'm led
- 1:12:09to believe with initial conversations
- 1:12:11that the hospital would allow us to take
- 1:12:13deliveries from the back and it wouldn't
- 1:12:15impact this if we have to go to a front
- 1:12:18apply for a permit to park load it and
- 1:12:20then leave. Okay. with flaggers.
- 1:12:31>> Right now the parking lot every time I
- 1:12:33go it's pretty empty. We have the
- 1:12:36parking lot back there. So hopefully
- 1:12:38>> hope it stays that way when we start.
- 1:12:41>> We won't bother anybody to that'll be
- 1:12:43completed fairly soon.
- 1:12:48>> What's your timeline?
- 1:12:50Assuming this gets going in the right
- 1:12:52direction, we would apply for permits
- 1:12:55next week for the first space that's
- 1:12:57already permitted, which is the
- 1:12:58downstairs. We're finalizing the
- 1:13:00drawings with Charlie and hope to have
- 1:13:02something ready for there's an existing
- 1:13:04building right now, which we're going to
- 1:13:05be filing for demo and we want to do the
- 1:13:06roof sooner than later. So, stops
- 1:13:10raining indoors.
- 1:13:11>> We're really hoping
- 1:13:13late spring nicely,
- 1:13:15>> be on the market. Yeah,
- 1:13:18>> but because I'm in the commercial um
- 1:13:21interior material business anyway, so
- 1:13:24that becomes very easy once I have the
- 1:13:26roof and the windows inside the room
- 1:13:29really fast.
- 1:13:31>> Okay,
- 1:13:42>> I think it's great. I think that the we
- 1:13:44don't really see a lot of proposals for
- 1:13:46studios and the fact that you can get
- 1:13:48more housing out of it for people. It's
- 1:13:51>> great.
- 1:13:52>> Lemonade out of London.
- 1:13:54>> Yeah.
- 1:13:54>> That's all we're architect Wesley. He's
- 1:13:57a native Kingston. He said this will be
- 1:14:00so good with it.
- 1:14:01>> Yeah. Yeah. Great location for I think
- 1:14:03and it'll be nice to see that.
- 1:14:04[laughter]
- 1:14:05>> Everybody's looking forward to it.
- 1:14:07>> He said thank you.
- 1:14:09>> Finally.
- 1:14:11Everybody can't wait. Yeah. Yeah.
- 1:14:15>> All right. So,
- 1:14:19>> All right. So, this is a type two. We
- 1:14:22have the
- 1:14:23>> They do have to require because it's 10
- 1:14:28units, you are required to have one unit
- 1:14:31dedicated affordable.
- 1:14:33>> We have three.
- 1:14:33>> We have three.
- 1:14:34>> Yeah.
- 1:14:35>> You'll have to have one deed restricted
- 1:14:36through a covenant. And then uh there
- 1:14:39will be a recting of $5,000
- 1:14:42and um we just recognize potential
- 1:14:45easement in the future. And then board
- 1:14:47policies 4 ending 6 7 11 12 16 A 17 20
- 1:14:5521 28 and 24
- 1:14:58which you will get. [laughter]
- 1:15:00>> Perfect.
- 1:15:01[clears throat] motion. You said the rec
- 1:15:03fee of nine, that was
- 1:15:05>> $9,000 for the recent.
- 1:15:08>> Yeah. The with 10 units, the first six
- 1:15:11are exempt.
- 1:15:12>> And then because the affordable, it's
- 1:15:15exempt as well.
- 1:15:16>> Yes.
- 1:15:18>> They're going to take the other two
- 1:15:20affordable that we're putting into
- 1:15:21consideration.
- 1:15:25>> Takes those not those are dee
- 1:15:27restricted, right?
- 1:15:28>> Yes. Okay. If they're deeed restricted,
- 1:15:30they're
- 1:15:32>> reduced further.
- 1:15:33>> They're preede restricted basically in
- 1:15:36perpetuity
- 1:15:37>> um for as long as the use remains
- 1:15:40residential.
- 1:15:44So that can be adjusted but yeah.
- 1:15:48>> All right. So motion next.
- 1:15:50>> I need a motion.
- 1:15:52>> Kai has a second.
- 1:15:55Sage. All in favor?
- 1:16:01Thank you folks. Really appreciate it.
- 1:16:04>> Look forward to
- 1:16:06>> receiving.
- 1:16:11Have a great evening.
- 1:16:17>> Yeah, we'll send you a letter.
- 1:16:22Thank you.
- 1:16:49I'm not standing
- 1:16:54out with us.
- 1:17:04Okay. Item number 9, 11, 111 Schwank
- 1:17:08drive site plan with associated waiverss
- 1:17:11to demolish the existing building and
- 1:17:13constructs a mixeduse building with
- 1:17:15groundf flooror commercial and
- 1:17:17residential above. SPL48.314-2-23.1
- 1:17:24Secret Determination that's two transect
- 1:17:27zone T5MS
- 1:17:30Lord 2 Ross Hoffman Milestone
- 1:17:33Development applicant CMRC LLC owner
- 1:17:39forward folks
- 1:17:53>> [laughter]
- 1:17:54>> We come from there
- 1:17:57specific.
- 1:18:27Thank you.
- 1:18:28>> Well, welcome folks. And if we could
- 1:18:29just have everyone's name for the
- 1:18:31record.
- 1:18:31>> Yeah, absolutely. Thank you so much for
- 1:18:32having us. Um, I'm Marley Bushin. I'm a
- 1:18:35partner in head of development at
- 1:18:36Milestones.
- 1:18:39Uh this is Martha Bush from Bush. I'm a
- 1:18:41director at Red Marble.
- 1:18:44And Valerie will also be joining us
- 1:18:46James associate marble.
- 1:18:49>> Um we've got Mike Morello who's doing
- 1:18:51our land use uh Paul Ararius who's our
- 1:18:55civil
- 1:18:57O' Conor from RCO partners on the
- 1:18:59project. Uh and a smattering of other
- 1:19:01people and Tim also from RCO my business
- 1:19:04partner Aaron. Um and Sam and Eloise
- 1:19:07Samara Bailey and Eloise Paul from Sik
- 1:19:09Street Advisors to our awesome project.
- 1:19:12>> Okay.
- 1:19:13>> Well, welcome folks. Um this point you
- 1:19:16just want to give us a walk through.
- 1:19:19>> Yeah, absolutely. Um so I think many of
- 1:19:21you know the site as the TIA site.
- 1:19:25[laughter]
- 1:19:25We uh would love for it to be rebranded
- 1:19:27as something else. Um but uh we're
- 1:19:30really excited about this project. We
- 1:19:32are proposing 135 units of all
- 1:19:35affordable housing. Um we are working
- 1:19:39with HCR on the financing for this. So
- 1:19:41we're doing it as a bond and credit
- 1:19:42deal. So that will ensure that it is%
- 1:19:46affordable. We're targeting AMIs between
- 1:19:4940 and 80%. Um and we are hoping to
- 1:19:54close on this about a year from now on
- 1:19:57financing. Um, assuming approvals and
- 1:20:00everything, it's going to look okay. Uh,
- 1:20:02we are including studios to
- 1:20:05three-bedroom units. Um,
- 1:20:08and, uh, as you can see, the building is
- 1:20:11sort of L-shaped. It's got a small
- 1:20:13amount of ground floor retail to comply
- 1:20:15with the zoning of T5 Main Street. Um,
- 1:20:18and we're also currently proposing doing
- 1:20:20the project uh, as mass timber uh, as
- 1:20:23sort of a sustainable building method.
- 1:20:26We have uh geothermal heating and
- 1:20:28cooling uh that we're designing into the
- 1:20:30project and um yeah we uh have over a
- 1:20:36100 spaces of surface parking. The site
- 1:20:38is quite large. It's about 2 acres so
- 1:20:40we're able to accommodate that. Um and
- 1:20:42we think that that will be more than
- 1:20:44enough for the uh population in the
- 1:20:46building. Um, and I will turn it over to
- 1:20:50the architects who will take us through
- 1:20:52more of the specifics. Yeah. If there's
- 1:20:54any questions about product team,
- 1:20:58>> looks like we're just getting the
- 1:21:01graphics up.
- 1:21:17We didn't
- 1:21:35speak.
- 1:21:54So while while they're doing this, this
- 1:21:56is um not only a site plan, but there's
- 1:22:00going to be a small lot line revision
- 1:22:04associated with this because there's a
- 1:22:06piece in the rear that they're going to
- 1:22:08be um studying. ownership of from the
- 1:22:12joint property to the you off the rear
- 1:22:16back here on the site. There's an odd
- 1:22:19sort of triangle uh that cuts into the
- 1:22:22111 site. And so we um have an agreement
- 1:22:26with um Bob Ryan uh who owns the
- 1:22:31property next door to acquire that site
- 1:22:33in conjunction with our closing. And you
- 1:22:35can actually see the triangle sort of
- 1:22:37highlighted on the model. Yeah.
- 1:22:39Computer. So, uh, project highlights,
- 1:22:42which Marley just ran through, just
- 1:22:45mentioned, 100% portable, 135 units, a
- 1:22:48hybrid CLT construction, cross laminated
- 1:22:51timber, uh, geothermal heating and
- 1:22:53cooling. Um, also some interesting site.
- 1:22:56We're actually in flood planes. We're
- 1:22:57doing flood resiliency. The building is
- 1:22:59actually 5 ft above the ground plane, so
- 1:23:02we're going with that. Um, and we're
- 1:23:05providing approximately 10 into parking
- 1:23:07spaces. So, real quickly, I'll go
- 1:23:10through some context and design and then
- 1:23:12get into the building. So, this is where
- 1:23:14it's uh located. So, this is the site
- 1:23:16with that lot line adjustment shown. So,
- 1:23:19we're just outside of the historic
- 1:23:21district here on the other side of the
- 1:23:22hill. Um, and there's the single uh old
- 1:23:27uh car lot there with asphalt around it.
- 1:23:30So when we got into the design, we were
- 1:23:33really taken obviously with the stockade
- 1:23:35district and with front street and wall
- 1:23:37street and kind of looking at the
- 1:23:38qualities of the buildings there um and
- 1:23:41contrasting that with swing drive. So we
- 1:23:43went through and we did a whole of
- 1:23:45looking at the rhythms and the
- 1:23:46proportions of those facades and trying
- 1:23:49to understand what makes those buildings
- 1:23:50have so much character. And then we
- 1:23:53looked at Shank Drive which has a quite
- 1:23:55different typology and suburban
- 1:23:57buildings parking lot, right? So, kind
- 1:23:59of the big question for us is how do we
- 1:24:01bring that character down the building
- 1:24:03over here? Um, and so this is some
- 1:24:06photos of the site if you don't know it
- 1:24:08that well. Uh, so this is the building
- 1:24:09on the back side here. You have all
- 1:24:12these build these trees that are going
- 1:24:13up the hill kind of screen the parking
- 1:24:15lot a little bit and there's existing
- 1:24:17foliage on the other side of the
- 1:24:18building as well. Um, so we're really
- 1:24:22taken with the textures of the town,
- 1:24:24right? all the different history and all
- 1:24:26the details that make up the buildings
- 1:24:27and particularly the adjacent stockage
- 1:24:30district area and we did a whole
- 1:24:32analysis looking at the wealth and
- 1:24:33material history that comes from uh
- 1:24:35Kingston the greater Olster County. So
- 1:24:37we looked at brick, we looked at timber,
- 1:24:40we looked at blue stone and lstone
- 1:24:41masonry, we looked at cement and then
- 1:24:44we, you know, went back to the site um
- 1:24:46and we looked at actually the building
- 1:24:48history uh of the stockate district and
- 1:24:51what the buildings were made out of
- 1:24:53largely brick framing siding and
- 1:24:54concrete and how that changed over time.
- 1:24:57So then when we went to the site, we
- 1:24:59took two what we call bars um and we
- 1:25:02treated one with brick and another with
- 1:25:04a limestone or stone like material.
- 1:25:06We're using a high density panel uh
- 1:25:08which has a texture to it. It's like a
- 1:25:10through material. Um so we defined those
- 1:25:13volumes. We articulated the volumes a
- 1:25:15little bit differently. The brick one
- 1:25:16has this stepping on the front to follow
- 1:25:18the curve. The shank drives so that it's
- 1:25:20not fully set the whole way. We
- 1:25:23connected them uh with this bridge
- 1:25:25across and then finally we articulated
- 1:25:27the volumes by adding some more wood
- 1:25:30into the the building and those kind of
- 1:25:33happen at public spaces within the
- 1:25:35building. Um and then we lifted the back
- 1:25:37portion of the building up so that way
- 1:25:38you get all the parking underneath it.
- 1:25:42>> Uh so that gives us two facade systems
- 1:25:44for the building. Um they're both uh a
- 1:25:47rain screen insulation system but on the
- 1:25:50front it's a a brick uh facade. It's a
- 1:25:52Kingston brick, so it's a bit longer and
- 1:25:54taller. Um, and then on the back is that
- 1:25:58uh highdensity panel that we talked
- 1:26:00about. So, the brick will have headers
- 1:26:02and sills. Um, and then the uh panel
- 1:26:06portion will have some trim around the
- 1:26:09windows to help cast shadows and break
- 1:26:10up the sun as well.
- 1:26:14So, we mentioned that it was hybrid CLT.
- 1:26:16What that means is that the floors are
- 1:26:18made out of cross laminated timber. Um,
- 1:26:20so because of the flood plane here,
- 1:26:23we're building that first floor out of
- 1:26:24concrete. So it's resiliency. It's a
- 1:26:26concrete podium. Um, so above that, you
- 1:26:30see these orange lines here. That will
- 1:26:32be cross laminerated timber flooring,
- 1:26:34which will be exposed in the apartments.
- 1:26:36So this is a similar style project, but
- 1:26:38you can see the wood ceilings there. And
- 1:26:41then the walls themselves will be uh
- 1:26:43light wood framing. So those are spaced
- 1:26:46on a 12x6 module um which act as baron
- 1:26:49and shear walls throughout. Uh and then
- 1:26:52also above the first floor that CLT is
- 1:26:55going to be making up the elevator
- 1:26:57shafts and the stair shafts. So when
- 1:26:59you're in the wood you can see where the
- 1:27:01public spaces are and where you can move
- 1:27:03by seeing the floor.
- 1:27:06Uh so this is a view from the northwest
- 1:27:08um which was on one of the earlier
- 1:27:10slides. This is the retail component uh
- 1:27:12that Marley mentioned. This is the kind
- 1:27:15of burning the sloping that we're using
- 1:27:17to navigate that five foot difference
- 1:27:19and using the landscape to mitigate it.
- 1:27:21So it's not just like a harsh wall in
- 1:27:23front of the building as well. Uh this
- 1:27:26is a view from the southwest in the
- 1:27:28parking lot essentially will be
- 1:27:31that way. And then this is the screening
- 1:27:33into a rear entrance into that amenity
- 1:27:35courtyard um that was mentioned. And you
- 1:27:38can start to see some of the amenity
- 1:27:40rooftop chairs if possible.
- 1:27:43And then looking at the northeast, you
- 1:27:44can see the drive aisle. So that takes
- 1:27:46you back into the parking two spaces.
- 1:27:48And then here you get a kind of clear
- 1:27:50view of the residential entrance. So
- 1:27:52again, anywhere where there's kind of
- 1:27:54public movement, that's where we start
- 1:27:55to bring in the wood and bring that in
- 1:27:56from the outside. Um, and then here you
- 1:27:59see the stepping of the building itself.
- 1:28:00It's stepping 2 and 1/2 in 2 and 1/2 ft
- 1:28:03increments. And so that creates kind of
- 1:28:05the natural canopy so they don't need to
- 1:28:07tap anything else on to the facade.
- 1:28:11And then this is a view from the
- 1:28:13courtyard. Kind of initial early sketch
- 1:28:15we did, but gives you an idea of the
- 1:28:17amenity spaces that we'll be wrapping
- 1:28:19this courtyard. So you'll have your
- 1:28:20lounge off of it. Uh you'll have your
- 1:28:22laundry and your gym. Um and then you
- 1:28:25can kind of see some of the CLT coming
- 1:28:27through the windows up there.
- 1:28:30Uh this is a ground floor plan zoomed in
- 1:28:33on the first floor of the building
- 1:28:35itself. So this was the courtyard that
- 1:28:37we were just looking at. You have your
- 1:28:38amenity spaces wrapping it with this
- 1:28:40corridor so that there's always natural
- 1:28:42light coming into that. Um, and then you
- 1:28:44have your main entrance here in the
- 1:28:46north, which is what we looked at with
- 1:28:47the ramp, the stairs, the retail, and
- 1:28:50the residential entrance on the same
- 1:28:51level. So, they're both at that 5ft
- 1:28:54uh elevation. And then there is a rear
- 1:28:57entrance from the parking area that has
- 1:28:59both a ramp and stairs as well. Um, on
- 1:29:02the ground floor, we also have like our
- 1:29:05water meter, electrical service room. Up
- 1:29:06here in the corner, we have a compactor
- 1:29:09room um which will carry 30 toers which
- 1:29:12will be brought and will be staged and
- 1:29:13back. We're working with our management
- 1:29:16on that.
- 1:29:18And then the typical floor these will
- 1:29:20run through two through six. Um so these
- 1:29:23have the studios, the one beds, the two
- 1:29:24beds and the three beds. Uh this repeats
- 1:29:27per the floor or per every floor. So
- 1:29:29there's an elevator bank here in the
- 1:29:31north. You have your stair here in the
- 1:29:32north and another stair in the south. So
- 1:29:34those run
- 1:29:36back
- 1:29:38down so that stair A goes out and exits
- 1:29:41through there and stair B can exit out
- 1:29:43here. And stair B actually exits out
- 1:29:45above the flood plane. Um, which is just
- 1:29:49kind of a, you know, in case there is a
- 1:29:52flood. That way you're not opening the
- 1:29:53boat right under the water.
- 1:29:57And then on the roof, we have an amenity
- 1:29:59terrace in the bar portion in the center
- 1:30:01there. Uh, and then we have the stairs
- 1:30:03on either side.
- 1:30:05Because we're using a geothermal system,
- 1:30:08we don't actually have that much
- 1:30:09equipment on the roof. So, we have two
- 1:30:11ERVs in the north and two ERVs in the
- 1:30:14south. And then there's a a generator
- 1:30:16that will be on the north on the ones.
- 1:30:21So, as part of this, we are going for
- 1:30:24seven uh waiverss. Three of them are
- 1:30:28major and four minor. The first one um
- 1:30:32is the build two zone. So as of right
- 1:30:35with the affordability bonus we can
- 1:30:37build up to six stories uh for the first
- 1:30:4080 ft. So that's essentially roughly
- 1:30:42this far and be brought up to six
- 1:30:45stories. Um what we're looking to do is
- 1:30:47to continue that across so that we get
- 1:30:51more affordable units here in the back
- 1:30:53side. Um the second major waiver is a
- 1:30:56distance between lazing. So, per zoning,
- 1:31:00just jump back to that view.
- 1:31:03Per zoning, this portion of the facade
- 1:31:06needs to be 2 ft wide. Uh, we're showing
- 1:31:08it as four to keep a proportional rhythm
- 1:31:10with the rest of the building. Um, and
- 1:31:12also to capture the structural column
- 1:31:14that's coming down better.
- 1:31:18The third major waiver is curb cut
- 1:31:22width. Uh, per the zoning, the maximum
- 1:31:24curb cut is 20 ft wide. We are showing
- 1:31:27currently a 24 ft per cuff lid and the
- 1:31:29arrows to 20 ft and a dry after you
- 1:31:31would be on the street. Uh the four
- 1:31:34minor waivers are for the front build to
- 1:31:36zone. So first one is per the zoning the
- 1:31:40building needs to be within 5 ft of the
- 1:31:43curve or the property line but because
- 1:31:45of the flood uh resiliency we need the
- 1:31:49space to get up into the building. So
- 1:31:52we're trying to set that back. Uh the
- 1:31:54building width uh the the zoning permits
- 1:31:58150 ft. So we're less than 10% older,
- 1:32:00but we're a little bit wider. This far
- 1:32:01is 162 ft. Um and then there is a blank
- 1:32:05wall on the ground floor
- 1:32:10here. So, in order to get this drive out
- 1:32:12here so that the drug cars can come
- 1:32:14through, that means that we need to put
- 1:32:16the front-facing uh utility entry here
- 1:32:20um instead of being able to like break
- 1:32:21it up or put something in between. Uh so
- 1:32:24that creates uh a blank wall that's a
- 1:32:27little bit larger, but we're
- 1:32:28articulating that with different
- 1:32:29materials and potentially putting
- 1:32:31signage there.
- 1:32:32>> Can you show that blank wall on the
- 1:32:34record?
- 1:32:35>> Is that Yeah, it's
- 1:32:38here.
- 1:32:39>> Okay. So our thought is like we can add
- 1:32:41signage here adjacent to it and then use
- 1:32:43the landscaping to soften that. Um so
- 1:32:46that way it's not just a big a stretch.
- 1:32:52And then the fourth waiver is related to
- 1:32:55sign uh per the zoning. The letter of it
- 1:32:58says that the wall signage needs to be
- 1:33:00uh above the storefront. we're showing
- 1:33:03it as adjacent uh in our drawings, which
- 1:33:06if I can pull those up, but um that's
- 1:33:09largely because here the storefront runs
- 1:33:10all the way to the top. So, we have this
- 1:33:12signage here to help break up that uh
- 1:33:17blank wall facade. Um whereas it'll be
- 1:33:20above the the storefront for the retail.
- 1:33:24And then this is the overall site plan.
- 1:33:28So, this has the 100G parking spaces,
- 1:33:30the EV spaces here to the south. The
- 1:33:32bike parking will be uh under the
- 1:33:35overhang of the building adjacent to the
- 1:33:38back entry. Um, and then we have our ADA
- 1:33:41spaces here as well.
- 1:33:42Uh Paul, was there anything else with
- 1:33:44the
- 1:33:46um I'll just say quickly uh with
- 1:33:50redeveloping a largely imperous site uh
- 1:33:53and actually reducing by 8% the
- 1:33:56impervious area. [snorts] Um I have
- 1:33:59verified in communication with the city
- 1:34:01engineer the base flood elevation we're
- 1:34:04using of 155.4.
- 1:34:06So the finished floors are all 2 ft
- 1:34:09above that.
- 1:34:11um and happy to answer any questions
- 1:34:14regarding our our civil site plan or
- 1:34:16engineering related issues. Can you just
- 1:34:20um speak to just a little bit about how
- 1:34:22right now there is storm water that kind
- 1:34:25of runs through the site that connects
- 1:34:27other properties as well and how that's
- 1:34:30going to all be redirected and on an
- 1:34:33interim when the construction is
- 1:34:35happening on this site how the storm
- 1:34:39water is going to be addressed from the
- 1:34:41adjacent sites and then does it back up
- 1:34:43there?
- 1:34:44>> Sure. Um, so we have, I believe, four
- 1:34:47connections. There's a small catch basin
- 1:34:50from Bob Ryan's property that goes into
- 1:34:53a basin on our site. We have a small
- 1:34:56basin from the teachers union on the
- 1:35:01adjacent site who have an easement here
- 1:35:03and a small 6-in line that comes onto
- 1:35:06our site. And then there's uh one other
- 1:35:09line from the Federal Credit Union that
- 1:35:12actually won't be affected. We'll be
- 1:35:14rrooting the storm. I could maybe show
- 1:35:17it better on a different plan. Um, so
- 1:35:20it's really just these two basins which
- 1:35:22are essentially overflows from a dry
- 1:35:24well system on this property adjacent.
- 1:35:28Um, not really concerned about during
- 1:35:32construction.
- 1:35:34They would go from downstream and back.
- 1:35:38So these would by the time these are
- 1:35:40tied back in they they would be
- 1:35:43connected to the frog alley system that
- 1:35:46discharges that way. Um if we have to do
- 1:35:50any temporary bypass
- 1:35:53uh if there's a storm and they're not
- 1:35:55connected in the couple days while we're
- 1:35:58reconnecting these these 6-in lines. Uh
- 1:36:02we'll we'll do that as needed.
- 1:36:05And you're proposing a new um
- 1:36:09the name of it,
- 1:36:10>> a hydrodnamic separator. Great.
- 1:36:12>> Thank you.
- 1:36:13>> That'll that'll help us meet our water
- 1:36:16quality volume treatment, right? For the
- 1:36:17slip uh redevelopment slip. Um allows
- 1:36:21for the use of those and that's that'll
- 1:36:23be here right before going out the frog
- 1:36:26alley. Um and that will be able to
- 1:36:29convey the 100year storm flow while
- 1:36:32while treating the storm water. Um
- 1:36:35>> I don't know if the board is familiar
- 1:36:37with that. Can you just kind of describe
- 1:36:38the system because I don't think it's
- 1:36:40something that
- 1:36:40>> Sure. It's more of a mechanized uh
- 1:36:43system. Um that's like a swirl um I I
- 1:36:50call it a filter filtration system that
- 1:36:52that treats storm water and and
- 1:36:54discharges a a cleaner uh storm water.
- 1:36:57We used one at Benedict 18 and we've
- 1:37:01used them all over for redevelopment
- 1:37:03projects. It's I think a 6ft diameter
- 1:37:07looks like a looks like a dry well but
- 1:37:09it has a it it's mechanized and and
- 1:37:13provides our treatment through
- 1:37:15>> filtration serviced or emptied.
- 1:37:18>> There's there's some maintenance
- 1:37:20requirements. Um I'm sure every 5 to 10
- 1:37:24years I I have to check the exact Yeah.
- 1:37:28the the building is anticipating having
- 1:37:29a living superintendent. Okay. So,
- 1:37:32maintenance should be easily covered.
- 1:37:40>> Yeah. So, if there any questions for
- 1:37:48>> So, just for the members, we obviously
- 1:37:51you've got staff notes. Um, we did send
- 1:37:54the staff counts out to you all. I'm
- 1:37:57sure started to look at them and digest
- 1:37:59them and we'll be making
- 1:38:03comments back on them. Or if you have
- 1:38:05any questions for us about anything that
- 1:38:08is within those, let us know um before
- 1:38:12next month. Um, this does need to go to
- 1:38:16the county. So I do want the board to um
- 1:38:19if they're comfortable with the level of
- 1:38:21information I think it's developed we
- 1:38:23think it's developed enough to send out
- 1:38:26the formal community having planning
- 1:38:28board um so that we can do that next
- 1:38:30month I think also I would ask the board
- 1:38:33at public hearing um there's obviously
- 1:38:36one required by law for the lot line
- 1:38:39revision that is part of project a site
- 1:38:42man public hearing is also in order on
- 1:38:46this Um the other thing um just as we
- 1:38:48talked about with the 25 bill court one,
- 1:38:51I think that there should be some um uh
- 1:38:55more visual simulations done. Um I'd
- 1:38:58like the board to think about and maybe
- 1:39:01tonight come up with a couple of
- 1:39:04locations that you know as you're coming
- 1:39:06down schwank or going up you know either
- 1:39:09direction on schwank. kind of it would
- 1:39:10be appropriate to have some uh visual
- 1:39:14simulations both day and night um with
- 1:39:18building context of existing buildings
- 1:39:21in place um and also maybe from up above
- 1:39:25to get a sense of need from the historic
- 1:39:29district. So I don't know what are the
- 1:39:32board's thoughts on that?
- 1:39:37I mean, this is a six-story building
- 1:39:40primarily a one-story area. So,
- 1:39:44especially the front street just to see
- 1:39:46what it'll do to the view. That'll be
- 1:39:48one location
- 1:39:51to see.
- 1:39:59>> So, the the parking lot on on North
- 1:40:01Front Street is right
- 1:40:03>> this is the guard rail.
- 1:40:04>> That plaza is down here.
- 1:40:06>> Yeah. Yeah. from Sun Street. It's due to
- 1:40:09the mature trees that are sort of on
- 1:40:11that slope up to the parking lot, they
- 1:40:13actually provide quite a bit of
- 1:40:15screening from Front Street.
- 1:40:18Um, but that's sort of the perspective
- 1:40:20there.
- 1:40:21>> Yeah, this is the parking lot.
- 1:40:23>> Do we know the grade change between the
- 1:40:26our parking lot and the parking lot?
- 1:40:30>> Yeah.
- 1:40:36We go from 180 to about what? What are
- 1:40:39we at? 154
- 1:40:41155.
- 1:40:42>> Yeah.
- 1:40:44>> 5T.
- 1:40:49>> I just I think it's important um to have
- 1:40:52those simulations particularly because
- 1:40:55one of the waiver requests is to have
- 1:40:59both the bit and the six floor extending
- 1:41:02feedback
- 1:41:04um all the way to the rear of the
- 1:41:06building which is quite a large
- 1:41:10deviation um waiver request I was it's
- 1:41:13close to 200% and so I think it's
- 1:41:17important to understand
- 1:41:19uh visually and different
- 1:41:26viewpoints.
- 1:41:30>> Sure. And we can also show it in context
- 1:41:32with the Kingstonian which will also be
- 1:41:35bring
- 1:41:36there
- 1:41:38>> and the
- 1:41:41guy mentioned it but the reason to bring
- 1:41:43that waiver why we're requesting that is
- 1:41:46we get about
- 1:41:4830
- 1:41:49>> additional units of affordable housing
- 1:41:52and so it it has a lot of implications.
- 1:41:55um if we were to lose those units, we'd
- 1:41:57likely be pushed into the HCR 9% uh
- 1:42:01financing program, which then is
- 1:42:03competitive, which you know, I can't say
- 1:42:06when we would close with that. And so,
- 1:42:08keeping our building at a certain scale,
- 1:42:11helps on multiple fronts.
- 1:42:14>> Yeah, doing the housing with those, you
- 1:42:17know, I think it's imperative that we
- 1:42:18look at all opportunities, but we'll
- 1:42:20definitely do those visuals that you
- 1:42:22requested. Let me know if the parking
- 1:42:24lot is uh been put out in RP and
- 1:42:28responses to develop on that which will
- 1:42:30alter greatly
- 1:42:33any use should a uh should a building be
- 1:42:36put on that parking lot.
- 1:42:38>> We'll get various board.
- 1:42:41>> Yeah, absolutely. So, yeah, we can take
- 1:42:43one from that parking lot. There are
- 1:42:44other areas that
- 1:42:45>> we have seen the intersection.
- 1:42:50Uh no other other interception just
- 1:42:53went.
- 1:42:54>> Yeah.
- 1:42:54>> Yeah.
- 1:43:10How
- 1:43:12going to be
- 1:43:14solely sourced through RO?
- 1:43:18>> We will be the managing agent. Um but
- 1:43:23this market
- 1:43:25for the
- 1:43:30>> and we'll do you know it's always been
- 1:43:32our president to notify the community as
- 1:43:35much as we can that the lottery is
- 1:43:36active to you know encourage as many
- 1:43:39applications especially locally as we
- 1:43:41can. Um you know we want people who live
- 1:43:44in Kingston who need an affordable home
- 1:43:46to be the first people to apply for
- 1:43:48this. So, if there's any suggestions of
- 1:43:50organizations you'd like to see us do
- 1:43:52outreach to, we're happy to consider
- 1:43:54that and make sure that we tell them
- 1:43:56that the lottery is active and even give
- 1:43:58them heads up. You know, in the past,
- 1:44:00we've done even trainings on like this
- 1:44:02is how you've actually applied for it
- 1:44:03when it's a complicated lottery system,
- 1:44:05things like that.
- 1:44:09>> So, the the parking um demand um and
- 1:44:12redemption study, they came in late.
- 1:44:15they just quickly reviewed it and a
- 1:44:17couple things. Um,
- 1:44:20and I'm I'm thinking that, you know,
- 1:44:22what might be nice to incorporate into
- 1:44:25the project would be maybe a bus shelter
- 1:44:28along the public railway to encourage,
- 1:44:31you know, ridership um or place for
- 1:44:34them. uh maybe um but it's not you know
- 1:44:38I know you said you would provide
- 1:44:40information to resonance but I'm not
- 1:44:44seeing the the intramodal kind of
- 1:44:47connectivity that I would like to see
- 1:44:49enough study identified
- 1:44:51>> sure and we can certainly talk to uh bus
- 1:44:54operator here and see if there is an
- 1:44:56opportunity for that and at the very
- 1:44:58least do way finding you know if they
- 1:45:00say we don't want a bus shelter there
- 1:45:01but do way finding you know bus stop 100
- 1:45:04ft this way, whatever it is, certainly
- 1:45:06want to encourage um multimodal transit.
- 1:45:12>> Man, with this being in the flood plane,
- 1:45:15what are there any specialized
- 1:45:17construction techniques that you're
- 1:45:19going to use to put pilings in or how is
- 1:45:23the support going into the brown to
- 1:45:26bedrock or what's that look like? So,
- 1:45:30our structural engineer is still working
- 1:45:31on that based off the geotech report.
- 1:45:33But um the basic feedback that we've
- 1:45:35gotten is because we're we're building
- 1:45:37up uh the 5T uh to do it with fill so
- 1:45:41that we're on slab. Um so that that
- 1:45:45would prevent having to wet flood proof
- 1:45:48anything. Um so currently uh the piles
- 1:45:53are are pretty standard. Um the deaths
- 1:45:56will be based off of the geotech report.
- 1:45:58Um in terms of like flood resiliency,
- 1:46:00there isn't a lot extra that we have to
- 1:46:02do because we're doing a a pile system
- 1:46:05here.
- 1:46:09>> Yeah.
- 1:46:14So would you be doing um so for the
- 1:46:18pilings would you be doing you' be doing
- 1:46:20compacting right from what I understood
- 1:46:22reading the geotech like they would be
- 1:46:25compacting the soils
- 1:46:27>> that's our understanding
- 1:46:28>> okay
- 1:46:32>> um would you be doing any surveying of
- 1:46:35the adjacent properties or monitoring
- 1:46:38any of the buildings that are
- 1:46:40>> Absolutely. Yeah, you know normal course
- 1:46:43of doing this we'll do a
- 1:46:44pre-construction survey of you know our
- 1:46:46geotech engineer or structural engineer
- 1:46:48will recommend which properties how far
- 1:46:50it should extend and then we'll do
- 1:46:52vibration monitoring optical monitoring
- 1:46:54whatever is necessary for their
- 1:46:56recommendations.
- 1:47:02So do you I have listed in the attendant
- 1:47:06the New York State Park art parks
- 1:47:07recreation start reservation as a
- 1:47:10circulating
- 1:47:12uh agency. Do you guys anticipate
- 1:47:15reaching out to them through Chris?
- 1:47:17Because the reason I ask is because what
- 1:47:20I found have been happening more and
- 1:47:22more recently is once DEC gets it in
- 1:47:25their system it takes several months
- 1:47:28then it goes to PRP and then it's like 5
- 1:47:32months later you get a letter that says
- 1:47:34oh we want to see everything. So do you
- 1:47:36guys go to Chris right in the beginning?
- 1:47:39Should we do it? Should we
- 1:47:43>> I typically only would have if we were
- 1:47:45doing the coordinating review which this
- 1:47:48is not we're treating this as the thing
- 1:47:50too we are
- 1:47:51>> yeah my concern my concern is that
- 1:47:53they're going to get it and then say
- 1:47:56okay we're commenting I mean even though
- 1:47:58they're not interested agency
- 1:48:02>> the like if you're going for state
- 1:48:04funding um financ
- 1:48:06It's going to be in the system that
- 1:48:08agency may referral process.
- 1:48:12>> Well, most
- 1:48:14but you don't you we can do it anyway.
- 1:48:17All right.
- 1:48:17>> Well, we can check in with HDR.
- 1:48:20>> I just don't want to find out like five
- 1:48:22to six months.
- 1:48:23>> Neither do I.
- 1:48:25I don't want to have a shovel ready
- 1:48:27project that that is the home for
- 1:48:31um and Sue you had mentioned uh sending
- 1:48:35referring this to the county. We did
- 1:48:37have our gateway meeting um with Dennis
- 1:48:39Doyle a couple weeks ago. Um no
- 1:48:42substantial comments came out of that.
- 1:48:44We learned about um Dennis's personal
- 1:48:46feelings on the brick.
- 1:48:51That that was the most controversial
- 1:48:53thing out of there.
- 1:49:02personally.
- 1:49:13>> Okay. So, where
- 1:49:18did he eat?
- 1:49:20>> Yes, he's
- 1:49:21>> okay. So when you were making the
- 1:49:23visuals, you want to see visuals from
- 1:49:26the intersections of Waza and Schwank
- 1:49:32looking towards this project. Um
- 1:49:35>> Frog Alley,
- 1:49:36>> Frog Alley and Schwank. And then up
- 1:49:38above from Broadfront Street looking
- 1:49:41down. any any other
- 1:49:43>> I think I'd like to see just kind of
- 1:49:44like a side with the onestory buildings
- 1:49:47like how tall the six stories will look
- 1:49:50compared next to
- 1:49:51>> okay
- 1:49:52>> you know like Ryan in next you know what
- 1:49:54I'm saying like something where we can
- 1:49:56see
- 1:49:56>> the surrounding property
- 1:50:04>> um I would do them in both nighttime and
- 1:50:08daytime
- 1:50:10But I think the night time particularly
- 1:50:13because if you're going to have the um
- 1:50:16top have that open area
- 1:50:20the lights and how that might impact.
- 1:50:23>> Yeah. We're also just doing um EGC as
- 1:50:27part of the HCR process. So we are
- 1:50:29following the uh dark side standards and
- 1:50:31the lighting. So as is we're trying to
- 1:50:34mitigate any kind of light spill off. So
- 1:50:37uh we've been white. So we'll we'll give
- 1:50:41you some illustrations of
- 1:50:46>> anything else.
- 1:51:04Now, if everything goes to plan
- 1:51:09if what are [clears throat] the
- 1:51:10timelines you guys are looking at?
- 1:51:14>> Sure. Um, so we have a pretty aggressive
- 1:51:19design schedule. We're currently on
- 1:51:21pause until we get the feedback from the
- 1:51:24planning board. But, uh, when we resume,
- 1:51:27uh, we'll be resuming with design
- 1:51:28development. Um, and we have a schedule
- 1:51:31that will get us to 100% CD bronze by
- 1:51:35the spring. Um, in our conversations
- 1:51:38with HCR, we've been talking about a
- 1:51:43late summer closing. Um, and we have
- 1:51:46also been talking since the tax credit
- 1:51:49project, we need tax credit investor. Um
- 1:51:52we currently have a couple of in
- 1:51:54investors who are interested and are
- 1:51:56holding us our project in their 27
- 1:51:58pipeline. Um tax credit equity has
- 1:52:00gotten very tight in the past couple of
- 1:52:02years and so we wouldn't be able to
- 1:52:05consider a financial closing
- 1:52:06[clears throat] without also having that
- 1:52:07sort of piece lined up.
- 1:52:11>> And then we're underwriting a 30month
- 1:52:14construction timeline I believe.
- 1:52:18Oh, excuse me.
- 1:52:20>> Um,
- 1:52:21>> sorry. I think it's 24. I'm sorry. I'm
- 1:52:24inflating projects.
- 1:52:25>> The fire chief did have some comments
- 1:52:27that I did upload. I don't know. You You
- 1:52:31should get notification when the upload.
- 1:52:33>> Yeah, I was reviewing the certain.
- 1:52:35>> I just want to make sure you were okay
- 1:52:36because he has some height.
- 1:52:38>> Yeah.
- 1:52:39>> Did look at that. I know the the minimum
- 1:52:42truck height is 16 ft. Our pass through.
- 1:52:45We're only 18 ft right now under the
- 1:52:48building itself.
- 1:52:50>> Uh the it does vary because of the
- 1:52:52slight grade change, but it's always at
- 1:52:55like 16T 9 to 17t.
- 1:52:58>> Okay.
- 1:52:58>> Um some of those
- 1:53:00>> there is some room in there so we can
- 1:53:01play with the design of that as develop
- 1:53:04it further.
- 1:53:04>> And we've been in contact with the
- 1:53:06chief.
- 1:53:07>> We met with Chris and he actually asked
- 1:53:10for a
- 1:53:12proposed swing gate. We uh so we ditched
- 1:53:15two parking spots there for now and uh
- 1:53:18because this is the fire
- 1:53:19>> Yes.
- 1:53:20>> Will fire department there
- 1:53:23>> and then the other comments were mostly
- 1:53:25regarding the building and alarmed.
- 1:53:28>> Yeah. Yeah. System
- 1:53:32>> commercial
- 1:53:34layout
- 1:53:36see those.
- 1:53:37>> Yeah, definitely.
- 1:53:39>> Sometimes we don't know that we say we
- 1:53:41>> Yeah. You upload it and you hope the
- 1:53:42notification goes up. [laughter]
- 1:53:44>> Those things are always got buried.
- 1:53:48>> So the referrals are kind of vending
- 1:53:49more you guys will take care of and
- 1:53:52setting the public hearing.
- 1:53:53>> Do you know what day that'll be the
- 1:53:55public hearing?
- 1:53:56>> Uh next meeting November
- 1:54:0216.
- 1:54:09November 16.
- 1:54:13>> You guys
- 1:54:18will
- 1:54:21soon be public hearing.
- 1:54:29>> Do you have any staff notes that we
- 1:54:32sent?
- 1:54:33>> No, I think they were all pretty strict
- 1:54:35in this room. So if there's anything
- 1:54:37that comes up as we develop.
- 1:54:39>> Okay. We're I'm still pulling from water
- 1:54:44sewer engineering facilities. I'll make
- 1:54:47sure we try and get those to you as
- 1:54:49possible.
- 1:54:51So you'll notice both.
- 1:54:55Yes.
- 1:55:15>> Thank you so much.
- 1:55:17>> Thank you.
- 1:55:19have to make the table.
- 1:55:21>> All right. Make a motion on the table
- 1:55:22and then this will
- 1:55:30>> work.
- 1:55:34All in favor
- 1:55:59>> I was here for so long today.
- 1:56:03Yeah. But
- 1:56:06then I'm also using
- 1:56:12so advertisement
- 1:56:15[laughter]
About this transcript
This page contains the full transcript of Planning Board Meeting by City of Kingston, generated from the public captions YouTube serves with the video. The transcript has 14,833 words across 2,470 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.