  1. 0:04stand of Jesus.
  2. 0:28Okay.
  3. 0:29>> Good evening everyone and welcome to the
  4. 0:32city of Kingston planning board meeting.
  5. 0:34Uh my name is Suzanne Kaggel. I'm the
  6. 0:36planning director for the city of
  7. 0:37Kingston. Uh before we start the
  8. 0:40meeting, I just have a few quick
  9. 0:41announcements that I want to go over. If
  10. 0:43you do have a cell phone, I'm just going
  11. 0:45to ask that you please put on silent. so
  12. 0:47that it doesn't interfere uh with any of
  13. 0:50the meeting discussion uh that's going
  14. 0:52on. Um I want to let everybody know that
  15. 0:56this meeting is being recorded and is
  16. 0:58being livereamed. So can you please be
  17. 1:00respectful of that. Uh if we have an
  18. 1:03emergency, we ask that you please use
  19. 1:05the stairs, not the elevator. If you
  20. 1:06need assistance, please ask us um and
  21. 1:09we'll help you. Uh the restrooms are
  22. 1:12through the chambers and on the opposite
  23. 1:14side. And as you go through, men's would
  24. 1:17be to the left, women's to the right,
  25. 1:19and if uh you have any conversations
  26. 1:22outside of those happening with the
  27. 1:25board, we just ask that you have them
  28. 1:27outside of the room uh so that you're
  29. 1:29not interfering with other discussions
  30. 1:31that are going on. With that, um I am
  31. 1:34going to turn it over to our standing
  32. 1:37chair, Matt Gillis, of this evening, to
  33. 1:39introduce the rest of the board members
  34. 1:42and staff that are presenting. Yeah.
  35. 1:44Well, good evening folks. Thank you. Um,
  36. 1:46so tonight we have planning board member
  37. 1:48Kairen Grande, uh, Vincent Archer, uh,
  38. 1:52Andrew Harris, and then Sue Kango, the
  39. 1:56planning director, Kyla Dbe, and then,
  40. 1:59uh, older person cats in the back.
  41. 2:03So,
  42. 2:05first item, uh, that the adoption of the
  43. 2:08September 22nd, 26th planning board
  44. 2:11meetings. Everyone's had a chance to
  45. 2:12review. Any additions, corrections?
  46. 2:17No. Motion to approve. Andrew Harris.
  47. 2:21All in favor?
  48. 2:23>> Second.
  49. 2:24>> I'll second. I
  50. 2:27>> All in favor? Okay, we are good. Uh we
  51. 2:31are going to shuffle a couple agenda
  52. 2:33items around just for efficiency this
  53. 2:36evening. Um
  54. 2:38back to it. Uh 409 East Chester Street.
  55. 2:43If you guys could come up to them.
  56. 2:49>> Yes. Thank you.
  57. 3:01Uh number 10. Yeah.
  58. 3:17Yeah, signing.
  59. 3:28>> Okay. Uh item 10 tonight, number 409
  60. 3:32East Chester Street. That's a major
  61. 3:34waiver request to increase the build to
  62. 3:37zone and decrease the rear yard setback.
  63. 3:40SPL48.75-9-1000
  64. 3:46uh seeker determination.
  65. 3:48That's
  66. 3:51>> it's type two.
  67. 3:52>> Type two. All right. Uh transex zone T3N
  68. 3:56ward 7 Winston and Tracy and Daly
  69. 3:59applicant owners.
  70. 4:02If you guys just quick intro for the
  71. 4:04record.
  72. 4:06>> I'm
  73. 4:08welcome.
  74. 4:10>> So you guys are seeking a building
  75. 4:12permit construction addition onto your
  76. 4:14home.
  77. 4:14>> Yes.
  78. 4:15>> Okay. Um
  79. 4:18so we have referred this to the uh
  80. 4:20zoning of horsemen. Uh two waiverss were
  81. 4:23identified due to the location of the
  82. 4:24addition. Just want to give us a quick
  83. 4:26overview of what you're looking to do.
  84. 4:29So the main thing that they wanted to do
  85. 4:31was put in a playroom. We're past the
  86. 4:33parents and um we have a nonverbal
  87. 4:39uh living room. We have him now for two
  88. 4:41years. Um he's artistic and he needs
  89. 4:46sensory input. So he's always moving
  90. 4:48jumping and the living room is about our
  91. 4:52current bedroom and there's no rest with
  92. 4:54us.
  93. 4:55>> Okay. So the main thing was to put in
  94. 4:57additional um playroom. Also my parents
  95. 5:00are living with us and the room they're
  96. 5:03now using is very small and my mom has
  97. 5:06arthritis. So we wanted to do a bigger
  98. 5:09room also. And so that's how we came up
  99. 5:13with the additions and then we decided
  100. 5:15to go one more room just in case if we
  101. 5:18have family members. So coming to visit
  102. 5:20stuff like that. Essentially what
  103. 5:23they're doing is they're following the
  104. 5:24current building form, you know, like
  105. 5:27the building lines versus having to
  106. 5:30bring it more towards the street which
  107. 5:33is a busy street and keeping it in line
  108. 5:36and just extending to the side.
  109. 5:38>> Yes.
  110. 5:45>> Okay.
  111. 5:46So where
  112. 5:48starting is ask the questions.
  113. 5:52>> So for our waiver checklist so board
  114. 5:56will go through these questions with a
  115. 5:58yes or no um to help make our
  116. 6:00determination. So the applicant has
  117. 6:03included a waiver request letter that
  118. 6:04clearly identifies and describes the
  119. 6:06waiver being proposed accompanied by
  120. 6:08plans and other vis visual
  121. 6:10representations that is applicable.
  122. 6:13>> Yes.
  123. 6:16Oh [clears throat] yes.
  124. 6:18>> Yes.
  125. 6:19>> Uh in their letter, the applicant
  126. 6:20describes in detail why the waiver is
  127. 6:23needed and how the waiver request is
  128. 6:25consistent with the intent, design, and
  129. 6:27compatibility of the transct zone in
  130. 6:29which the project is located.
  131. 6:32>> Yes. Yes.
  132. 6:37Will granting the waiver contribute to
  133. 6:39the realization of the overall intent of
  134. 6:41the transex zone that an approved
  135. 6:43project which will be an attractive
  136. 6:45durable contribution to the transex
  137. 6:47zone?
  138. 6:51>> Uh we have yes or no. Yes.
  139. 6:58>> Uh to support walkable neighborhoods
  140. 7:00andor mixeduse centers. The project
  141. 7:03emulates the neighborhood context for
  142. 7:05how far the building buildings relate to
  143. 7:08the sidewalk, how the saw is designated,
  144. 7:10and how the building interacts with the
  145. 7:12street.
  146. 7:15>> Yeah.
  147. 7:17>> Continuation.
  148. 7:21>> The project supports a green and
  149. 7:23resilient future. For example, by
  150. 7:25reducing vehicular miles traveled,
  151. 7:27providing green infrastructure and/or
  152. 7:28street trees and/or including
  153. 7:30highquality usable open space.
  154. 7:37Project supports incremental development
  155. 7:40patterns in its size and density and
  156. 7:42supports infill development or the reuse
  157. 7:44of existing buildings.
  158. 7:47>> Yeah. Yes. Yes, sir.
  159. 7:50The project supports the provision of a
  160. 7:52variety of housing types to support a
  161. 7:54range of income levels, age groups, and
  162. 7:56family units.
  163. 7:58>> Yep.
  164. 8:00>> The project specifies street design that
  165. 8:02is walkable, bikable, and will reinforce
  166. 8:04safe and comfortable environments for
  167. 8:07all users.
  168. 8:11>> Okay. So,
  169. 8:13>> looks like we're good for the waiver.
  170. 8:16>> Yep. Um so it is recogniz type two.
  171. 8:20>> Okay. This is a type two in seeker and
  172. 8:24then do we have to do a motion and
  173. 8:26>> yuction to approve the waiver.
  174. 8:28>> Who would like to make the motion?
  175. 8:30Andrew secondra.
  176. 8:32All in favor?
  177. 8:34>> I
  178. 8:34>> opposed.
  179. 8:36Passed.
  180. 8:40>> Thanks.
  181. 8:45Any questions? He's
  182. 8:5695 Wilson Avenue. Okay. He's come on up.
  183. 9:12>> Welcome. We can just get names for the
  184. 9:15record. Steve Schuma.
  185. 9:18Oh, they welcome.
  186. 9:24>> Okay.
  187. 9:26So, item 11, 95 Wilson Avenue, major
  188. 9:31waiver request to install a larger curve
  189. 9:33cut than permitted. Uh, SBL48.269-4-8.
  190. 9:40Seeker determination. Uh, it's typ.
  191. 9:43>> Yes.
  192. 9:43>> Okay. Transex zone T3N ward 6
  193. 9:48and a so pronunciation of your name
  194. 9:51>> I like the boom
  195. 9:53>> tweet and Steve Schoonmaker the
  196. 9:55applicant voters
  197. 9:58um the applicant is for a major waiver
  198. 10:00for section 405.16e3
  199. 10:03which limits the maximum curtain cut to
  200. 10:0610 ft for a single family home.
  201. 10:09Um remove the existing driveway to add a
  202. 10:12pool and fenced in yard. We're now
  203. 10:13looking to relocate the driveway to
  204. 10:15accommodate an off street space for the
  205. 10:17vehicles. Um, you guys just give us a
  206. 10:20quick overview.
  207. 10:22>> Sure. Um, we started this process a
  208. 10:25little over a year ago.
  209. 10:27Um, we installed the pool and we want to
  210. 10:30move the driveway 12 ft from the
  211. 10:32original area where it was.
  212. 10:36>> So, yeah, you see it was the driveway
  213. 10:38was kind of was more over towards the
  214. 10:40pool. So, we wanted to move the
  215. 10:42driveway. It would be if you were on
  216. 10:45Seavoy towards Wilson, about 12 feet
  217. 10:48over where Richland was. And, uh, you
  218. 10:52know, we're asking for reasonable
  219. 10:53accommodation because we'd have a adult
  220. 10:55son with autism.
  221. 10:57Um, we first initially applied for the
  222. 10:59permit. Um, they required us to get a
  223. 11:02survey, which we did do, but it's very
  224. 11:06confusing because
  225. 11:08in the emails we've had with the build
  226. 11:10code enforcement office,
  227. 11:13they said we didn't need a permit.
  228. 11:16And the DPW, we'd have to apply for a
  229. 11:19permit for them initially, which Mr.
  230. 11:22Kums came out I would say it was
  231. 11:24probably in June of last year and did a
  232. 11:27site survey and he said they see any
  233. 11:29issues with the driver beyond it wasn't
  234. 11:32as large as initial was you know where
  235. 11:34the driveway was to be moved and he
  236. 11:36didn't see a problem because it was from
  237. 11:38the curb it was 50 possibly fit the heat
  238. 11:40of the curbon Wilson
  239. 11:44um so we got a survey couldn't get a
  240. 11:46survey done until the beginning of this
  241. 11:48year and
  242. 11:50I am kind of dumbfounded why I had to
  243. 11:54even get a survey.
  244. 11:56Um it's contextual to the adjacent
  245. 11:59properties still have wise rocket waste.
  246. 12:02Some have been in recent years so it's
  247. 12:04not grandfathered. Some have been added
  248. 12:06on to consulted with some of the
  249. 12:08neighbors never had required to survey.
  250. 12:10But primarily, like I said, where we're
  251. 12:12doing the uh
  252. 12:14you know, alterations to our home is
  253. 12:16because of our our oldest son who's 23
  254. 12:18who has severe autism.
  255. 12:20>> And uh currently we're parked on the
  256. 12:22street and we haven't been able to do
  257. 12:24anything until we resolve this. And it's
  258. 12:26very unsafe.
  259. 12:28We, you know, for him to go out on the
  260. 12:30street because sometimes he they say,
  261. 12:32you know, getting in and out of the car,
  262. 12:34you know, century. Sometimes he he, you
  263. 12:37know, he has a little anxiety and
  264. 12:38everything. And we even actually had two
  265. 12:40letters thrown in our yard of complaints
  266. 12:43over the last, let's say, six months,
  267. 12:46you know, anonymous letters, you know,
  268. 12:47kind of really, you know, um, degrading
  269. 12:50us and stuff about your situation about,
  270. 12:52you know, parking on the street with a
  271. 12:54child, having a kid with a a child with
  272. 12:56a condition, you know, you're not a good
  273. 12:58parent. So, you know, uh we did consult
  274. 13:01with an attorney and of course they felt
  275. 13:04like we would be better off putting for
  276. 13:06a reasonable accommodation in to see if
  277. 13:08we can get this resolved. Okay.
  278. 13:11>> Basically, just so there's an understand
  279. 13:13so the board has a little bit of
  280. 13:15background, residential properties are
  281. 13:18allowed for 10T wide per cut. They're
  282. 13:20asking for a dice larger than typical
  283. 13:25would be for a normal residential use,
  284. 13:27but they did in their application also
  285. 13:29provide representative examples of other
  286. 13:33properties within close proximity that
  287. 13:35have the same type of double wide
  288. 13:37driveways. So, we pretty standard ask
  289. 13:46Let's
  290. 13:52see. Any issue with not approving this?
  291. 13:56Okay. So, we need to just go through the
  292. 13:58checklist,
  293. 13:58>> right?
  294. 14:18Okay.
  295. 14:20>> The applicant has included a waiver
  296. 14:22request letter that clearly identifies
  297. 14:24and describes the waiver being proposed
  298. 14:25accompanied by plans and other visual
  299. 14:27representations as applicable.
  300. 14:30>> Yes.
  301. 14:31>> Yes.
  302. 14:33Uh in their letter, the applicant
  303. 14:35describes in detail why the waiver is
  304. 14:37needed and how the waiver request is
  305. 14:39consistent with the intent, design, and
  306. 14:41compatibility of the transsect zone in
  307. 14:43which the project is located?
  308. 14:45>> Yes.
  309. 14:45>> Yes.
  310. 14:47>> Uh will granting the waiver contribute
  311. 14:49to the realization of the overall intent
  312. 14:51of the transct zone and result in
  313. 14:53approved project which will be an
  314. 14:55attractive and durable contribution to
  315. 14:57the transex zone?
  316. 15:00>> Yes.
  317. 15:03To support walkable neighborhoods and/or
  318. 15:05mixed use centers, the project emulates
  319. 15:07the neighborhood context for how the
  320. 15:09building buildings relate to the
  321. 15:10sidewalk, how the facade is designed,
  322. 15:12and how the building interacts with the
  323. 15:14street.
  324. 15:15>> Nice.
  325. 15:17>> I'm not done on that, but
  326. 15:19yes.
  327. 15:22Uh the project supports a green and
  328. 15:24resilient future uh by for example
  329. 15:27reducing vehicular miles traveled,
  330. 15:29providing green infrastructure and/or
  331. 15:31street trees andor including high
  332. 15:33quality usable open space.
  333. 15:37>> Not ethical.
  334. 15:38>> Yeah.
  335. 15:40>> Uh the project supports incremental
  336. 15:43development patterns in its size and
  337. 15:44density and supports an infill
  338. 15:46development or the reuse of existing
  339. 15:48buildings.
  340. 15:56Project supports the provision of a
  341. 15:57variety of housing types to support a
  342. 16:00range of income levels, age groups, and
  343. 16:02family units.
  344. 16:05>> Project specifies street design that is
  345. 16:07walkable, bikable, and will reinforce
  346. 16:09safe and comfortable environments for
  347. 16:11all users.
  348. 16:13>> Yes.
  349. 16:15>> Yes.
  350. 16:19Oops.
  351. 16:20>> I got one vote for each.
  352. 16:21>> So you're not clickable
  353. 16:24or see
  354. 16:29how
  355. 16:29>> I think it's okay.
  356. 16:31>> You think it's non?
  357. 16:33>> Well, you're no. The reason why I said
  358. 16:35last is because it's
  359. 16:38the only person that's not
  360. 16:40[clears throat] able to
  361. 16:44be safe and use the environment
  362. 16:47comfortably is their son. So this would
  363. 16:50include him
  364. 16:52and therefore it would be
  365. 16:55specific to the walkable
  366. 16:58area which is in her cut on the
  367. 17:00sidewalk.
  368. 17:06>> So you're going to have to take a vote
  369. 17:09of
  370. 17:11the total overall waiver.
  371. 17:18>> Okay. So, um I guess we're going to do a
  372. 17:21board vote and then approve the waiver.
  373. 17:25>> Make a motion.
  374. 17:26>> Make a motion um to approve this waiver.
  375. 17:31>> Second.
  376. 17:31>> Second.
  377. 17:32>> Okay. All right. I
  378. 17:34>> I
  379. 17:40Okay. So, it's approved.
  380. 17:57Hey, maybe
  381. 18:08>> uh item number two, 370 Albany Avenue,
  382. 18:13public hearing for administrative
  383. 18:14Special permit renewal to operate a car
  384. 18:16wash.
  385. 18:18Is anyone here for 370?
  386. 18:22>> Anybody's here to speak?
  387. 18:23>> Oh, to speak on 370. All they have
  388. 18:31to
  389. 18:32>> make a motion.
  390. 18:34>> Y motion to close the public hearing at
  391. 18:37370. And your second
  392. 18:40motion then second.
  393. 18:55>> All righty.
  394. 19:05All right. 713 Gerald Street,
  395. 19:08subdivision of the lands of Travis
  396. 19:09Meyers, SPL56357-14-210,
  397. 19:16seek of a termination type 2, transect
  398. 19:18zone T4N, W 7. Um,
  399. 19:23Travis Myers, applicant owner,
  400. 19:26is anyone here for 713 Gerald Street?
  401. 19:35Vat funding. So, um, basically what this
  402. 19:39one is, if if you recall, um, about a
  403. 19:43year or so ago, we reviewed a
  404. 19:46application to combine your parcels into
  405. 19:48one. We had a proposal to develop a four
  406. 19:52unit rowhouse type of structure. Um,
  407. 19:56financially that has economically become
  408. 19:59unfeasible for him. So he is now
  409. 20:03reverting back wanting to separate the
  410. 20:05parcels again. He's going to sell one
  411. 20:07off and retain the other. It's pretty
  412. 20:10straightforward.
  413. 20:11>> Pretty simple.
  414. 20:15Any questions from the board?
  415. 20:19>> This is unlisted.
  416. 20:23>> So
  417. 20:26make a motion to
  418. 20:30action. So this is an unlisted action.
  419. 20:46to accept that.
  420. 20:48>> This looks to be in order. Um make a
  421. 20:51motion to accept the short environmental
  422. 20:54assessment form. Vince Andrew second.
  423. 20:58All approved.
  424. 21:00Opposed. Okay.
  425. 21:05Sign up.
  426. 21:21Thank you.
  427. 21:26So any are there any questions on this
  428. 21:29line? Okay.
  429. 21:32So you will need five paper copies, one
  430. 21:36by
  431. 21:39final written in descriptions
  432. 21:42for um
  433. 21:45becoming signed and we will need
  434. 21:49uh the owner signature
  435. 21:53before the chairman and sign up
  436. 21:58l
  437. 22:00and for policy Yes.
  438. 22:02>> Okay.
  439. 22:13>> Um motion to approve this.
  440. 22:16Andrew second.
  441. 22:20All in favor? Opposed? All right. It's
  442. 22:23passed.
  443. 22:29>> Okay. 79 Journ Street.
  444. 22:34Um, so good evening. Hang on one sec.
  445. 22:38So, this is a subdivision of lands of uh
  446. 22:43three FFR LLC and a major waiver for
  447. 22:46rear yard set SPL56.42-14-21
  448. 22:52uh seeker determination type two.
  449. 22:56>> It's correct. Transex Oh, I'm listed.
  450. 22:59Sorry.
  451. 23:00Transex zone T4N ward 8 Michael Veterary
  452. 23:04applicant uh 3 FFR is the owner.
  453. 23:09>> Welcome back.
  454. 23:10>> Thank you. And just quick name for the
  455. 23:12record. Mike Ferry surveyor. I'm
  456. 23:15representing the Fras and 3 FFR LLC. Uh
  457. 23:18we have two homes situated on one lot on
  458. 23:22the corner of German and Ridge. Um
  459. 23:26pictures of the homes here. here. I know
  460. 23:28you guys have them in the application,
  461. 23:29but obviously we have fronting on German
  462. 23:33and then we have the brick home fronting
  463. 23:34on ridge. I had to tried to get some
  464. 23:36decent pictures here to show the spacing
  465. 23:38and so on, but they are in the
  466. 23:39application. Um, so we're trying to
  467. 23:43separate the two houses into separate
  468. 23:45deed lots. Uh, we come into a few things
  469. 23:48that um, not only the planning
  470. 23:50department but the building department
  471. 23:52um is interested in, including the
  472. 23:54spacing between the structures. uh being
  473. 23:56a building department related item, the
  474. 23:59offset to the rear of the building,
  475. 24:01being a waiver related mathematical
  476. 24:04item. Uh but we are with in terms of our
  477. 24:07lock coverage, we are um you know, we're
  478. 24:10good to go. We don't we don't we're not
  479. 24:12even close to the lock coverage um
  480. 24:16percentages.
  481. 24:17Um we've designed the new line to meet
  482. 24:20all of the 5-ft spread as required by
  483. 24:23the building department. Uh we've
  484. 24:26created an easement to bring utilities
  485. 24:29into the brick rear structure.
  486. 24:32Uh we are seeking the variance aka
  487. 24:35waiver for the rear um
  488. 24:40yard setback and otherwise
  489. 24:44um we are you know looking to get some
  490. 24:46type of uh two separate deed homes uh
  491. 24:51each having different frontage brick
  492. 24:52home fronting on street with the front
  493. 24:54facing street German obviously facing
  494. 24:57German street uh so they already have a
  495. 25:00a view of being separate ated. We're
  496. 25:02just trying to officially separate them.
  497. 25:06Um, and that is basically the gist of
  498. 25:10the story.
  499. 25:13>> I'm just going to talk about the
  500. 25:14easement that is going to be required as
  501. 25:16well, Mike,
  502. 25:18>> for the the utility easement. Yeah. So,
  503. 25:21in order for us to get the 5-ft spread,
  504. 25:24uh, we have to have an easement for the
  505. 25:26gas to um connect to the brick
  506. 25:30structure. We're obviously close in this
  507. 25:32area here. Um, and there's a picture of
  508. 25:35that area. Um, well defined in the
  509. 25:38application looking down between the
  510. 25:40structures. Um,
  511. 25:44small easement. Um, you know, L6 is on
  512. 25:50here is uh, you know, they're small
  513. 25:52distances. L4 being 21 ft. So, it's
  514. 25:55roughly 20 by 5t on one end. So, it's
  515. 26:00maybe 100 square ft,
  516. 26:03125 ft max.
  517. 26:12Questions from the board.
  518. 26:15>> Is it a new utility pool or exist?
  519. 26:18>> No, that's an underline. That's an
  520. 26:19underground gas line. That's probably
  521. 26:21from the, you know, the 80s, 70s, 80s
  522. 26:24when the gas went in.
  523. 26:27No, I was talking about the utility
  524. 26:28pole.
  525. 26:29>> Oh, the utility pole.
  526. 26:30>> Yeah.
  527. 26:31>> Um, no, that's been there. That's how
  528. 26:33they've always got electric. And that
  529. 26:34actually really doesn't come into play.
  530. 26:36Luckily for us, the the the overhead
  531. 26:38utilities are already well split. The
  532. 26:41only item that we have is the
  533. 26:43underground gas that requires an
  534. 26:45easement through lot two to attach to
  535. 26:47lot one.
  536. 27:06relatively straight.
  537. 27:09>> Okay.
  538. 27:10And you do need to do the waiver check
  539. 27:14set back
  540. 27:16just so you understand it's a 10 foot
  541. 27:19rear setback and so in making the United
  542. 27:27Street
  543. 27:31versus the T. Also, one thing to uh
  544. 27:35speak on on the waiver is um in terms of
  545. 27:37contextual for that neighborhood, 10
  546. 27:41foot would be less contextual than what
  547. 27:43we're asking for based upon the fact
  548. 27:46that the Delaware and Hudson canal lots
  549. 27:47are obviously very congested. You know,
  550. 27:49the houses are some of them are are in
  551. 27:52this neighborhood. There are many
  552. 27:53structures which are party ball lines.
  553. 27:55So, there's no setbacks whatsoever. So,
  554. 27:58in terms of the overall look and
  555. 28:01context, um, this fits with the overall
  556. 28:04look of the neighborhood. There's
  557. 28:06nothing outlined here that's saying, "Oh
  558. 28:07my god, there's only a short amount."
  559. 28:09Everything is a short amount in that
  560. 28:11neighborhood, specifically those few
  561. 28:13streets in that block. Uh, you have some
  562. 28:15tight buildings in there. Um, that's
  563. 28:18probably how they got built together on
  564. 28:20one lot in the first place.
  565. 28:23So the one of the houses faces here and
  566. 28:27one of them faces here and so the line
  567. 28:31is the correct or the setback is coming
  568. 28:35in here and it's been indicated by fire
  569. 28:38department that's make them safely.
  570. 28:43[clears throat]
  571. 28:44>> So just to give you a better idea also
  572. 28:46like here I know you're talking about
  573. 28:48the front. So here's the picture of the
  574. 28:50house fronting on German. So we have
  575. 28:52this white frame structure here is the
  576. 28:54house fronting on ridge the brick
  577. 28:56structure and then this is the spacing
  578. 28:59between. So we have a 5ft spread coming
  579. 29:01down through here to get these two. So
  580. 29:03there's still walkable area on both
  581. 29:05sides of the boundary line. And that
  582. 29:07easement that I show is right here going
  583. 29:09in. The gas line comes in. You can see
  584. 29:11the gas meter on the house right there.
  585. 29:13>> And then this is actually our
  586. 29:15neighboring house right here. So again,
  587. 29:17the lots are tight in this area. Um but
  588. 29:20that is these are the does
  589. 29:22>> that have anything to do with it being a
  590. 29:23dead end?
  591. 29:24>> No, that's just that's a separately
  592. 29:27separate deed in property on the end of
  593. 29:28the block.
  594. 29:31>> That is just potential any
  595. 29:35system.
  596. 29:42All right. The applicant has included a
  597. 29:44waiver request that clearly identifies
  598. 29:46and describes the waiver being proposed
  599. 29:49accompanied by plans and other visual
  600. 29:51representations as applicable.
  601. 29:54>> Yes.
  602. 29:56>> In their letter, the applicant describes
  603. 29:58in detail why the waiver is needed and
  604. 30:00how the waiver request is consistent
  605. 30:02with the intent, design, and
  606. 30:03compatibility of the transsect zone in
  607. 30:06which the project is located.
  608. 30:08>> Yes.
  609. 30:08>> Yes.
  610. 30:10Will granting the waiver contribute to
  611. 30:12the realization of the overall intent of
  612. 30:14the transex zone and result in improved
  613. 30:17project which will be an attractive and
  614. 30:19durable contribution to the transex
  615. 30:21zone.
  616. 30:24Okay.
  617. 30:28>> To support walkable neighborhoods and or
  618. 30:30mixed use centers. The project emulates
  619. 30:32the neighborhood context for how far the
  620. 30:34building buildings relate to the
  621. 30:36sidewalk, how the facade is designed,
  622. 30:39and how the building interacts with the
  623. 30:41street.
  624. 30:44>> Yeah, these are existing.
  625. 30:46>> Yes. project supports a green and
  626. 30:49resilient future by for example reducing
  627. 30:52vehicular miles traveled, providing
  628. 30:54green infrastructure, indoor street
  629. 30:55trees and/or including high quality
  630. 30:58usable open space and
  631. 31:03project supports development patterns
  632. 31:05such as size and density and supports
  633. 31:07infill development or the reuse of
  634. 31:09existing buildings.
  635. 31:13project supports the provision of a
  636. 31:15variety of housing types to support a
  637. 31:17range of income levels, age groups, and
  638. 31:20family units.
  639. 31:24Project specifies street design that is
  640. 31:26walkable, bikable, and will reinforce
  641. 31:29safe and comfort comfortable
  642. 31:31environments for all users.
  643. 31:36>> Okay. So that approved.
  644. 31:42>> I will point out one thing. I don't have
  645. 31:44a policy six on this map. Uh just as
  646. 31:47it's been going back and forth between
  647. 31:48the building and planning department,
  648. 31:50but we'll add that as we get more.
  649. 31:53So
  650. 31:56with uh
  651. 32:04this looks to be completion
  652. 32:09[clears throat]
  653. 32:15to accept the short environmental
  654. 32:17assessment board.
  655. 32:18>> Make a motion to accept.
  656. 32:20>> I second. Vince.
  657. 32:23All in favor?
  658. 32:25Opposed?
  659. 32:41And then um so the motion would be for
  660. 32:46uh approval of the line on the
  661. 32:49subdivision with board policy six
  662. 32:52including the major waiver with their
  663. 32:54setback uh submission of five paper and
  664. 32:57one line copies uh written descriptions
  665. 33:01for filing including the easements uh
  666. 33:03within in those descriptions and all
  667. 33:06signed by the owner before the
  668. 33:07chairman's signature.
  669. 33:11>> Motion
  670. 33:14second
  671. 33:18all approved.
  672. 33:22>> Okay.
  673. 33:22>> Good.
  674. 33:23>> So, thank you. And Sue, if you want to,
  675. 33:26you know, in when you have time in an
  676. 33:27email or whatever, um, lead me to where
  677. 33:30you want me to go next. I know we talked
  678. 33:31about the building department having to
  679. 33:34approve of of the subdivision after the
  680. 33:36subdivision approved. So, um if it's
  681. 33:39dropping these off or an email copy or
  682. 33:41whatever to get teaching moving forward,
  683. 33:43please advise.
  684. 33:45>> Thank you everybody.
  685. 33:46>> Thank you.
  686. 33:47>> Have a good night.
  687. 33:53>> All righty. So,
  688. 33:56>> yep. So item five, 298 to 300, 302 to
  689. 34:00318, 392 to 306 Old Boulevard, 262
  690. 34:05Boulevard, 43 to75 Albert Street
  691. 34:08extension, 308 to 318
  692. 34:12uh R Boulevard, 45 to 49 Condi Street,
  693. 34:16lot line revision to combine seven lots
  694. 34:19into three, SPL56.48-2-700
  695. 34:2248-2-7.100
  696. 34:25and 7.200 200
  697. 34:288 9 1000
  698. 34:3211 and 12 secret of termination
  699. 34:37type two transex zone T3 N-0 war 9 P and
  700. 34:43D group LLC is the applicant owner so
  701. 34:47>> good evening
  702. 34:48>> welcome Paul Arios uh from Baneer and
  703. 34:51Arios our firm I'm representing the
  704. 34:53applicant Jaffer of the D&D group.
  705. 34:57>> Um, our firm did the survey and
  706. 34:59subdivision work.
  707. 35:01>> He's putting it up.
  708. 35:04>> I don't know [clears throat] if that
  709. 35:06wants these.
  710. 35:07>> They have them in their notes. So,
  711. 35:27They do have a copy in my house. Do you
  712. 35:29want to start? It's just
  713. 35:31>> So the owner applicant uh owns a total
  714. 35:34of eight lots here uh adjacent lots. One
  715. 35:38of them uh this one here that fronts 32
  716. 35:42will remain the same. Uh the other seven
  717. 35:44lots will be essentially consolidated
  718. 35:48into three lots for a total of four
  719. 35:51total lots
  720. 35:53uh essentially to accommodate for
  721. 35:56potential future development of uh these
  722. 35:59lower lots.
  723. 36:01Uh I believe we're seeking two major
  724. 36:04waiverss
  725. 36:05uh for exceeding the maximum lot width
  726. 36:08and lot depth.
  727. 36:10These dimensions were already
  728. 36:14exceeding the lot width and depth as in
  729. 36:18their current state. But as the go of
  730. 36:20creating the new lots under the new
  731. 36:22zone, the waiver is required.
  732. 36:30>> So they existed
  733. 36:32outside what is current names on each
  734. 36:36other. Correct. Well, there's multiple
  735. 36:38laws. So what they're doing is kind of
  736. 36:42shifting property lines, consolidating
  737. 36:45from 7 to three,
  738. 36:47>> right? Um the if you're familiar with
  739. 36:51the location where uh Denver Electric is
  740. 36:54located um the business will stay
  741. 36:58primarily they're consolidating those
  742. 37:00upper lots on the top portion
  743. 37:04>> be deleting lot lines here
  744. 37:06>> and then
  745. 37:08>> and down below they're shifting one over
  746. 37:10to create two new lots that will be
  747. 37:14primarily I guess developed as
  748. 37:16residential new resial housing parcels.
  749. 37:24So, they'll be accessed off of book
  750. 37:26Albert and Condandy Street.
  751. 37:33>> So, the the the waiver ask is based on
  752. 37:39>> the current lots do exceed that wick and
  753. 37:42depth. Um, so it's not really u it's
  754. 37:46it's not like the subdivision uh made
  755. 37:49these lots much larger.
  756. 37:51>> So the poor the poorbased code has
  757. 37:54maximum depth and maximum widths, right?
  758. 37:58And so just by shifting a line it could
  759. 38:02be two of those dimensional
  760. 38:05requirements. So they do the the
  761. 38:08waiverss in order to exceed those
  762. 38:10dimensional requirements on the lower
  763. 38:12portion
  764. 38:14>> but it's just in relation to the actual
  765. 38:15property. It's not because of the
  766. 38:17structure.
  767. 38:18>> Correct. Yeah. There's no structures
  768. 38:20where they are going to be new
  769. 38:21buildings, new houses. So if you out of
  770. 38:25an existing
  771. 38:27line that now falls under
  772. 38:32not being compliant under the formbbased
  773. 38:35code now what would be the issue in
  774. 38:37making it compliant with the current
  775. 38:40form based code
  776. 38:44>> meet multiple small
  777. 38:47>> I think because they're combining
  778. 38:49parcels
  779. 38:50>> they're adding they're adding properties
  780. 38:53together, we're creating larger two
  781. 38:56larger parcels on the lower section and
  782. 38:59one parcel on the upper section. So by
  783. 39:02combining all of the properties
  784. 39:04together, the lower the lower parcels
  785. 39:06exceed the dimensions.
  786. 39:09>> Yeah. Cuz it's 100 ft wide.
  787. 39:11>> It's the it's just the nature of the the
  788. 39:14property.
  789. 39:16>> Yeah.
  790. 39:18>> Very large. Yeah.
  791. 39:21And then the depth is 180 ft. This goes
  792. 39:24past those because of taking multiple
  793. 39:27small combiners. I told fewer larger
  794. 39:30lots
  795. 39:37>> questions
  796. 39:41the checklist.
  797. 39:43>> Yes, you should.
  798. 39:50No, I only want do we?
  799. 39:53>> Yeah. One for both because they're both
  800. 39:55dimensional.
  801. 39:57>> All righty. Uh, the applicant has
  802. 40:00included a waiver request that clearly
  803. 40:02identifies and describes the waiver
  804. 40:04being proposed accompanied by plans and
  805. 40:06other visual representations as
  806. 40:08applicable.
  807. 40:09>> Yes.
  808. 40:11In their letter, the applicant describes
  809. 40:13in detail why the waiver is needed and
  810. 40:15how the waiver request is consistent
  811. 40:17with the intent, design, the
  812. 40:19compatibility of the transex zone in
  813. 40:21which the project is located?
  814. 40:23>> Yes.
  815. 40:26>> Granting the waiver will granting the
  816. 40:29waiver contribute to the realization of
  817. 40:30the overall intent of the transct zone
  818. 40:32and result in an improved project which
  819. 40:35will be an attractive and durable
  820. 40:36contribution to the transct zone.
  821. 40:40Yes.
  822. 40:42>> To support walkable neighborhoods and or
  823. 40:44mixed use centers, the project emulates
  824. 40:47the neighborhood context for how far the
  825. 40:49building buildings relate to the
  826. 40:51sidewalk, how the facade is designed,
  827. 40:53and how the building interacts with the
  828. 40:54street.
  829. 40:58Project supports green and resilient
  830. 40:59future by for example reducing vehicular
  831. 41:02miles traveled, providing green
  832. 41:04infrastructure and/or street trees
  833. 41:06and/or including high quality usable
  834. 41:08open space.
  835. 41:13>> Project supports incremental development
  836. 41:16patterns in its size and density and
  837. 41:18supports infill development for the
  838. 41:20reuse of existing buildings.
  839. 41:24>> Yes.
  840. 41:26your prices
  841. 41:31usually just the building. It's one
  842. 41:33building.
  843. 41:34>> It's or though
  844. 41:35>> is that
  845. 41:36>> it's um
  846. 41:38supports infield development or reuse of
  847. 41:41existing.
  848. 41:42>> Yes.
  849. 41:45>> Project supports the provision of a
  850. 41:47variety of housing types to support a
  851. 41:49range of income levels, age groups, and
  852. 41:52family units.
  853. 41:55project specifies street design that is
  854. 41:57walkable, bikable, and will reinforce
  855. 41:59safe and comfortable environments for
  856. 42:01all users.
  857. 42:08>> So that's approved. So now motion to
  858. 42:11accept.
  859. 42:12>> All right. Motion, Andrew. Who would
  860. 42:15like to second? Vince.
  861. 42:18Um
  862. 42:20all in favor? No opposed?
  863. 42:25This cast
  864. 42:42almost there.
  865. 42:54I think five
  866. 43:00policy six
  867. 43:03um and the waivers approved um regard by
  868. 43:08paper copies my uh written instructions
  869. 43:12will need to be submitted and the result
  870. 43:14parcels and the final will need to be
  871. 43:17signed by the own chairman and then by
  872. 43:21the planning board with all the
  873. 43:25>> paper.
  874. 43:32>> Okay. So, a motion kind
  875. 43:36Andrew. All in favor? Opposed?
  876. 43:50Second off
  877. 44:26Up next, item 6, 40 Thomas Street,
  878. 44:30public hearing for administrative
  879. 44:31special permit renewal to operate an
  880. 44:34emergency shelter SPL56.25-4-44.
  881. 44:40Seeker determination miss
  882. 44:42>> type two
  883. 44:43>> type two transex zone T5F ward 5 family
  884. 44:48Woodstock applicant owner
  885. 44:51so
  886. 44:52>> this is basically public hearing that
  887. 44:55you're holding um no one
  888. 44:59>> anyone have to speak
  889. 45:04>> hearing is now closed
  890. 45:08okay
  891. 45:10Okay.
  892. 45:11>> All right. Item number seven, 25 Fields
  893. 45:14Court site plan and waiverss to
  894. 45:17construct a miss mixed use building with
  895. 45:20commercial on the ground floor and
  896. 45:22residential above SPL56.25-3-25
  897. 45:28secret of termination. This one suit
  898. 45:33this will be
  899. 45:36>> this will be a type two seeker
  900. 45:38determination transex zone T5F ward 4
  901. 45:42teeth libold applicant city of Kingston
  902. 45:45owner.
  903. 45:46So welcome votes.
  904. 45:48>> It's public hearing. So there's anybody
  905. 45:50from the public that wants to speak on
  906. 45:52this?
  907. 46:02Mike.
  908. 46:05[laughter]
  909. 46:07>> Okay. If we could introductions for the
  910. 46:10record, please.
  911. 46:11>> Sure. Good evening. My name is Michael
  912. 46:12Lante. I'm the product engineer for this
  913. 46:14application for the board and I'm here
  914. 46:16with Mr.
  915. 46:18Development team.
  916. 46:19>> Okay.
  917. 46:21>> She's online. Is she going to
  918. 46:25>> She is. She can. She she's
  919. 46:28>> here and I'm happy to share screen by
  920. 46:31these two. I'm not sure what what
  921. 46:33everyone prefers.
  922. 46:39>> Welcome folks. Would you like to just
  923. 46:41walk us through?
  924. 46:42>> Sure. Um I brought hard copies
  925. 46:46on screen. You want to bring up the
  926. 46:49site?
  927. 47:03Can everyone see the screen?
  928. 47:05>> Yeah,
  929. 47:06>> that's great.
  930. 47:08>> Okay, so as you noted earlier, uh the
  931. 47:11site location is 25 Field Court. It's at
  932. 47:13the end of Field Court on this side and
  933. 47:16near the intersection of O'Neal Street,
  934. 47:18Midtown Linear Park at that location. Um
  935. 47:21the existing site actually consists of
  936. 47:23an abandoned commercial building. Um the
  937. 47:26entire site is paved or impervious
  938. 47:30through use of the building. Uh we're in
  939. 47:32the T5 um flex zone for this particular
  940. 47:35project and we're proposing 71 units
  941. 47:38with five stories. It's got an attic and
  942. 47:40a partial basin. Uh we are seeking uh
  943. 47:43waiverss uh as a part of this project.
  944. 47:4640516
  945. 47:48E3, 40516F,
  946. 47:50and 4056DJ
  947. 47:53respectively. We're also proposing um 35
  948. 47:57parking spaces. Stands, you can stay on
  949. 47:59the site there pretty much. Um we're
  950. 48:01proposing 35 parking spaces and we've
  951. 48:04designed stormwater detention areas in
  952. 48:07this portion of the lot and under the
  953. 48:09parking space over here and that portion
  954. 48:12of the lot. Um so outside of those
  955. 48:14waiverss that we're requesting, it
  956. 48:15appears that the project's fully zoning
  957. 48:17compliant.
  958. 48:19Um we prepared landscaping plan,
  959. 48:22lighting plan, broader details that go
  960. 48:25along with it.
  961. 48:27That's basically the project in a nutsh
  962. 48:33meeting and then incorporate the
  963. 48:35comments from the last meeting and this
  964. 48:36meeting and have those turned fairly
  965. 48:38quickly. you've addressed most of what
  966. 48:41percent
  967. 48:43or
  968. 48:44>> so you got your staff's comments back
  969. 48:47and obviously we just received the
  970. 48:50county board comments
  971. 48:53you've seen those
  972. 48:55um they've been posted online as well so
  973. 49:00have you had a chance to take a look at
  974. 49:03them and give consideration or any
  975. 49:06thoughts on I know one of them was
  976. 49:08pedestrian and access egress be for to
  977. 49:13me street. Another one was to um and I
  978. 49:17don't know this had an opportunity to
  979. 49:19look at those as well. that came in
  980. 49:20Friday.
  981. 49:21>> But another one was to provide for some
  982. 49:24additional uh visual um concept uh
  983. 49:30drawings to show the evening and daytime
  984. 49:34and shadowing um impacts that could
  985. 49:37potentially lead to the um green line
  986. 49:40along the halfway there. Um as you look
  987. 49:44at that,
  988. 49:44>> well, I thought we kind of submitted
  989. 49:46that. I was a little confused by that
  990. 49:47when we taught it because we gave the
  991. 49:49visuals of all four sides of the
  992. 49:51building and we gave visuals of sort of
  993. 49:54a sunset. It will
  994. 49:55>> I remember that.
  995. 49:56>> Yeah. and it will cast a shadow at
  996. 49:58certain times of the day. And so
  997. 50:01>> it's right up against the
  998. 50:03>> I think one of the things that the board
  999. 50:05is going to be interested in seeing are
  1000. 50:08um a little bit more of the
  1001. 50:10architectural detail in to the visual
  1002. 50:15simulations as well as some nighttime
  1003. 50:17renderings.
  1004. 50:19um some of the the renderings that were
  1005. 50:21provided you know leave a lot of
  1006. 50:24question about window treatments and and
  1007. 50:27materials
  1008. 50:28um and that so I think a little bit more
  1009. 50:32detail on those would be helpful in a
  1010. 50:35planning evaluation in terms of what
  1011. 50:38it's going to look like from different
  1012. 50:40vantage points not only from the rail
  1013. 50:43line but from the adjoining streetscape
  1014. 50:46um would be good
  1015. 50:47>> what I'd like to do is provide But um
  1016. 50:49you know it doesn't render the the
  1017. 50:51building details well when you reduce
  1018. 50:53the scale so much. So I blew it up and
  1019. 50:56maybe if I showed you a section of each
  1020. 50:58so you can kind of get a feel for the
  1021. 51:00actual
  1022. 51:01>> Yeah. See like the cortises the sills
  1023. 51:04the lentils they're building material up
  1024. 51:07facade but just those little details.
  1025. 51:10>> No I understand we were just talking
  1026. 51:12about that today that you really you
  1027. 51:14can't you just can't see that scale. Uh
  1028. 51:17the first floor is planned to be brick
  1029. 51:18and then the up floors would be various
  1030. 51:20types of concrete siding and even the
  1031. 51:24color. There's variations throughout
  1032. 51:25that two-tone, three tone, whatnot.
  1033. 51:28>> Yeah,
  1034. 51:29>> I think a night a nightcape or night.
  1035. 51:31>> You want a nightcape as well?
  1036. 51:33>> Yeah, I think so.
  1037. 51:33>> We did one there's one rendering of uh
  1038. 51:36we did at sunset
  1039. 51:39of the main night. I see.
  1040. 51:41>> Hey Stannis, do we have that one
  1041. 51:42rendering that shows the building at
  1042. 51:44sunset at the entrance? Yeah, we
  1043. 51:47actually have [snorts] we did uh daytime
  1044. 51:50and nighttime views for each view.
  1045. 51:54>> Yeah. I think the problem is at that
  1046. 51:56scale we can't see they can't see the
  1047. 51:58details of them.
  1048. 51:59>> Yeah. So in that in that rendering there
  1049. 52:02like the the windows just like black.
  1050. 52:06>> No, I understand.
  1051. 52:07>> They don't.
  1052. 52:08>> Yeah.
  1053. 52:10Yep.
  1054. 52:15>> Yeah. And the color changes are subtle.
  1055. 52:17It doesn't it doesn't render well on
  1056. 52:19this. Um can you go up one, Standish?
  1057. 52:23We didn't do virtual renderings of
  1058. 52:25different color patterns, but there is a
  1059. 52:27few different uh
  1060. 52:29>> so I also think putting putting the
  1061. 52:32project into the context of the
  1062. 52:36neighborhood and the enjoying buildings
  1063. 52:38rather than having it as a standalone
  1064. 52:42type of
  1065. 52:42>> Yeah. Okay.
  1066. 52:44>> visual. [snorts]
  1067. 52:45um would be helpful.
  1068. 52:52>> Well, again, I wanted to hear that
  1069. 52:55tonight. That's going to be a very
  1070. 52:57specific shape to that. the rest of the
  1071. 53:01elements including
  1072. 53:04>> should have
  1073. 53:07>> I think the light from the building is
  1074. 53:08actually going to help that part of
  1075. 53:11Broadway because on Broadway is so
  1076. 53:13bright but then just right back it's
  1077. 53:17very dark. So
  1078. 53:21seeing it from that perspective too is
  1079. 53:23only going to show and demonstrate what
  1080. 53:25kind of difference there is with all
  1081. 53:27that additional light.
  1082. 53:34Yeah.
  1083. 53:36>> Can you go back to the plan?
  1084. 53:49Now with during construction, what's the
  1085. 53:52plan for staging materials?
  1086. 53:55How do you anticipate that? Well, sure.
  1087. 53:59We're going to utilize the uh parking
  1088. 54:01area, stage materials, and then once the
  1089. 54:04building's up, we'll then focus on
  1090. 54:07building the parking area out the
  1091. 54:09construction work. goes in parking mis.
  1092. 54:13>> You also have this open area back here
  1093. 54:15which before the structure goes up can
  1094. 54:17store materials as well
  1095. 54:22>> security. What do you have planned for
  1096. 54:24that?
  1097. 54:25>> Um we have to fence the site in and we
  1098. 54:27have to we'll have some cameras up which
  1099. 54:29are far
  1100. 54:34twice so can have those.
  1101. 54:37>> Okay. But we will have a we're going to
  1102. 54:39do a just a plan in which we've gusted
  1103. 54:42still plan on the show staging. I mean
  1104. 54:45it's kind of easy on this site because
  1105. 54:46it's already
  1106. 54:48so you know we kind of have a nice
  1107. 54:51surface.
  1108. 54:52>> Yeah. Jump start because you know you
  1109. 54:55use the aring areas lay down the arc for
  1110. 54:57the building and then as the building
  1111. 54:59goes up um you'll switch over and do the
  1112. 55:02site work when they finish the inside of
  1113. 55:04the building. So with most of your
  1114. 55:06activity going on to field port um with
  1115. 55:10construction and this presuming most of
  1116. 55:13your materials and and the construction
  1117. 55:15activity will get in and out of field
  1118. 55:17boards. How are you thinking of any
  1119. 55:21traffic control um at Broadway because
  1120. 55:24that's that's a tough exit out there for
  1121. 55:29traffic signal
  1122. 55:30>> normal traffic and like we're going to
  1123. 55:32have larger vehicles and construction
  1124. 55:34vehicles going in and out. Do you have
  1125. 55:38any thoughts about that?
  1126. 55:40>> We'll look at it. We plan no more than
  1127. 55:43two deliveries a day. So I don't I don't
  1128. 55:45think that's going to be a huge impact.
  1129. 55:47we can
  1130. 55:48>> once the foundation's in place um the
  1131. 55:52the oneway lane going through O'Neal
  1132. 55:54will be open so we'll have during
  1133. 55:57construction that can be that can go in
  1134. 55:59either direction so we'll have the
  1135. 56:01ability to come to that line
  1136. 56:04>> um if you know if there is if there is
  1137. 56:07an occasional long body truck that has
  1138. 56:10to get in there it's probably going to
  1139. 56:11want to come on that O'Neal side and
  1140. 56:13we'll have to shuttle things like
  1141. 56:15>> okay
  1142. 56:16>> wood six would come in on that side of
  1143. 56:18the building.
  1144. 56:20And then we had talked to you about the
  1145. 56:22parking um supply and demand reduction
  1146. 56:26strategy working on that
  1147. 56:27>> is being completed with
  1148. 56:30>> okay
  1149. 56:32existing studies in town to that study
  1150. 56:35and those solutions
  1151. 56:39>> the existing union that's happen court
  1152. 56:42including the pickle ball is that going
  1153. 56:45to be something that's going to have to
  1154. 56:47come to halt for two years while this is
  1155. 56:48be developed or is there a way for them
  1156. 56:50to paint those programs?
  1157. 56:52>> I hope
  1158. 56:54>> I know that the heart
  1159. 56:56is
  1160. 56:57>> heart of Midtown happens on field and
  1161. 57:00then also the pickle balls becoming more
  1162. 57:03popular.
  1163. 57:04>> Yeah.
  1164. 57:05>> Yeah. We did want to talk about I think
  1165. 57:07that third entrance tonight
  1166. 57:10court. Um, we were wanting to have that
  1167. 57:13be a dual entrance, but a safety
  1168. 57:16entrance for snow removal in the winter
  1169. 57:18if we have to duck snow off the site.
  1170. 57:20Um, because there isn't a lot of snow
  1171. 57:22load here. And um, in in case we get a
  1172. 57:27an accident or something that prevents
  1173. 57:30the access onto O'Neal, you had a way to
  1174. 57:33circute
  1175. 57:37that. It's funny. We thought I I thought
  1176. 57:40we had discussed that early on that was
  1177. 57:42something the board was openly
  1178. 57:44considering. I had to remove it, but
  1179. 57:48um it's it's important from access
  1180. 57:51standpoint. Yeah.
  1181. 57:52>> Alone because otherwise we literally
  1182. 57:54have one way traffic through the site.
  1183. 57:56So one way is never the safest. I mean,
  1184. 57:59it would be the best if we could put
  1185. 58:00some type of a, you know, gate with a
  1186. 58:02bar that raises um so that if we need to
  1187. 58:05have um residents or anyone that exits
  1188. 58:07the site and moving lead out of O'Neal,
  1189. 58:10we can get out the field court as well.
  1190. 58:11And then also, as Keith noted, it
  1191. 58:14assists us in a little bit
  1192. 58:20as far as the parking landscape. Um,
  1193. 58:23would the board like to see a like a
  1194. 58:27stone wall along the field horn face
  1195. 58:30along the green sections
  1196. 58:32to
  1197. 58:34that way? We could come up with like a
  1198. 58:3630-inch wall with stone face and a cap
  1199. 58:38that would be at least double as a
  1200. 58:40sitting bench as well as a
  1201. 58:42>> say in in terms of combining those
  1202. 58:46activities that generally take place
  1203. 58:48there the general public. It might be
  1204. 58:50nice to maybe incorporate your, you
  1205. 58:52know, combination of the seating element
  1206. 58:55with with your landscaping
  1207. 58:58uh requirement to, you know,
  1208. 59:00>> what sort of what would you see along
  1209. 59:03here? Cuz we we were thinking about
  1210. 59:04doing like where these green spaces are
  1211. 59:09uh here, here, and here. Doing a like a
  1212. 59:14concrete wall and stone veneer path and
  1213. 59:16it would be like a sitting bench. So,
  1214. 59:19it's going to be great.
  1215. 59:20>> Kind of acts as a a visual break. It
  1216. 59:23meets the
  1217. 59:24>> desire of the code,
  1218. 59:26>> but it's also very functional. People
  1219. 59:28are there. They can actually just sit on
  1220. 59:29it,
  1221. 59:30>> especially if they're picking and feel.
  1222. 59:32>> Yeah.
  1223. 59:34>> You could also have like a a trash
  1224. 59:36receptacle to the people there playing,
  1225. 59:38but ultimately have something to throw
  1226. 59:40away. It's not worth to just have a
  1227. 59:43meeting in Sky.
  1228. 59:46>> There were um some comments
  1229. 59:48>> the need for that waiver.
  1230. 59:51>> Yeah.
  1231. 59:51>> Okay. Yeah.
  1232. 59:52>> Yeah. Yeah.
  1233. 59:53>> So, there were some comments received
  1234. 59:55from the CC as well.
  1235. 59:57>> I saw that.
  1236. 59:58>> You saw those as well. So, we're going
  1237. 59:59to need to have them address those.
  1238. 1:00:02>> Sure.
  1239. 1:00:02>> Um in your final response for for
  1240. 1:00:04November meetings.
  1241. 1:00:05>> Okay. Um what one of the other parking
  1242. 1:00:08comments was the the setback from the
  1243. 1:00:10parking from the property le 2 ft versus
  1244. 1:00:125t. Um that is a waiver we'd be seeking
  1245. 1:00:15because I think it allows us an extra 1
  1246. 1:00:192 3 four parking spaces
  1247. 1:00:21>> and there's already a shortage of
  1248. 1:00:22parking in the city of the site. So, um
  1249. 1:00:25it's a it's a small waiver request from
  1250. 1:00:272 ft to 5 ft plus. I think the addition
  1251. 1:00:29of this um landscape wall will provide a
  1252. 1:00:34nice separation between the parking lot
  1253. 1:00:36um and field court which will add to the
  1254. 1:00:38I think board's consideration of that
  1255. 1:00:40later.
  1256. 1:00:45We spoke with the landscape architect
  1257. 1:00:47seeing what work heard before they
  1258. 1:00:50started their on
  1259. 1:00:53>> right
  1260. 1:00:54>> together.
  1261. 1:00:56>> Yeah, I believe he's working with Korean
  1262. 1:00:59>> on final plan.
  1263. 1:01:00>> Yeah,
  1264. 1:01:01>> the third the third wave I think was the
  1265. 1:01:03elevation difference between the first
  1266. 1:01:05floor
  1267. 1:01:06>> I mean
  1268. 1:01:06>> and the grade. Yeah,
  1269. 1:01:08>> the accepted. Okay. So, I didn't discuss
  1270. 1:01:10that, but just from an ADA entrance
  1271. 1:01:12compliance, we'd absolutely move that.
  1272. 1:01:21>> I guess you want us to continue to
  1273. 1:01:22pursue with the extra curve cut
  1274. 1:01:26>> with the
  1275. 1:01:28>> what?
  1276. 1:01:29>> The extra curve cut will remain, but
  1277. 1:01:30we'll have a gate for emergency access.
  1278. 1:01:32That's my
  1279. 1:01:34>> How does the board feel about that
  1280. 1:01:36though?
  1281. 1:01:37Well, the word there still is going to
  1282. 1:01:39be a waiver for the second curve.
  1283. 1:01:41>> Yes.
  1284. 1:01:41>> Yeah. Yes.
  1285. 1:01:45>> Yeah. I think maybe not a lot easier
  1286. 1:01:48just and still retains access.
  1287. 1:01:51>> Yeah.
  1288. 1:01:51>> I think it's the best of the reports.
  1289. 1:01:54>> I agree.
  1290. 1:01:56Okay.
  1291. 1:02:02The board have any other questions?
  1292. 1:02:11comments between the city engineer at
  1293. 1:02:13the end of
  1294. 1:02:14>> I sent him an email today reminding him
  1295. 1:02:17that we are looking for his comments. So
  1296. 1:02:20hopefully I will keep pushing you
  1297. 1:02:24>> but yeah
  1298. 1:02:24>> I said about peing at the end. Yeah. And
  1299. 1:02:27uh I mean the water department has
  1300. 1:02:29essentially looked at your drawings GPW
  1301. 1:02:33revision. So you've gotten their
  1302. 1:02:35feedback
  1303. 1:02:37and
  1304. 1:02:42>> board have any other comments?
  1305. 1:02:44>> What else?
  1306. 1:02:47>> Okay. So anything
  1307. 1:02:49about the marching voters?
  1308. 1:02:51>> Are we leaving the public open?
  1309. 1:02:55>> Sorry. Are they leaving the public
  1310. 1:02:56hearing open?
  1311. 1:02:58>> Um,
  1312. 1:03:00do you want to leave the public hearing
  1313. 1:03:02open or do you want to close it?
  1314. 1:03:04>> I would leave it open.
  1315. 1:03:06>> Yeah.
  1316. 1:03:06>> Okay. I would leave it open for now.
  1317. 1:03:08>> Okay.
  1318. 1:03:12[clears throat]
  1319. 1:03:14>> So,
  1320. 1:03:17what's
  1321. 1:03:27Motion.
  1322. 1:03:28Make
  1323. 1:03:29>> motion to table this and keep the public
  1324. 1:03:31hearing open until next moment. Andrew's
  1325. 1:03:33motion. Second. Kyra.
  1326. 1:03:37All in favor? Opposed.
  1327. 1:03:40Okay.
  1328. 1:03:48>> And at the time of the 76.
  1329. 1:03:51>> Okay. Right. Thank you.
  1330. 1:03:54Thank you.
  1331. 1:04:07>> And let the record show that saved you.
  1332. 1:04:10New Kirk has arrived. Will be
  1333. 1:04:12participating.
  1334. 1:04:15>> Don't lose our time. Go away again.
  1335. 1:04:19>> Did they win? They won. One to zero.
  1336. 1:04:22We're not
  1337. 1:04:24>> correct
  1338. 1:04:35or something.
  1339. 1:04:45Number eight.
  1340. 1:04:57Okay. Item number 8, 350 Broadway site
  1341. 1:05:00plan to construct an addition to an
  1342. 1:05:02existing building and establish 10
  1343. 1:05:03residential units. SPL56.26.11-4900
  1344. 1:05:10seeker determinations.
  1345. 1:05:13So
  1346. 1:05:14>> this one is I think T2
  1347. 1:05:18uh Transexo T5 MS W9 Diane Chen is the
  1348. 1:05:24applicant 350 Broadway Kingman LLC owner
  1349. 1:05:28welcomes
  1350. 1:05:30we just names for the record please.
  1351. 1:05:31Good evening, Dian Chen. As we said, um
  1352. 1:05:35here's Mike Shiloh, my GC builder. So,
  1353. 1:05:39I'm going to turn everything over to
  1354. 1:05:41him. [laughter]
  1355. 1:05:43>> Well, if you just want to give us a
  1356. 1:05:44quick walk through. Sure.
  1357. 1:05:46>> Pulling up the screen. So,
  1358. 1:05:48>> you guys are probably familiar with the
  1359. 1:05:50property because it's been on the
  1360. 1:05:51planning board previously with the grant
  1361. 1:05:53on seven units. When Diane bought the
  1362. 1:05:56property, it was shown at seven units,
  1363. 1:05:58but it would never qualify for um a
  1364. 1:06:01building permit because the two adjacent
  1365. 1:06:04lots, even though they're lower, didn't
  1366. 1:06:06allow proper fires because there was no
  1367. 1:06:09way they had multiple bedrooms. During
  1368. 1:06:11this process, we discovered that the
  1369. 1:06:13second and third floor roofs are in
  1370. 1:06:16total need of replacement. And we talked
  1371. 1:06:18to our local architect Charlie Wesley
  1372. 1:06:20and looked at the feasibility of of just
  1373. 1:06:23removing down to the second floor and
  1374. 1:06:24going back up over the existing
  1375. 1:06:26footprint and closing the entire
  1376. 1:06:28footprint to make the building code
  1377. 1:06:31compliant. We could only fit studios
  1378. 1:06:32like when you get one bedroom if we
  1379. 1:06:35closed off then we wouldn't be fired. So
  1380. 1:06:37we figured out that we can keep the same
  1381. 1:06:38bedroom count but get 10 units versus
  1382. 1:06:41the seven that were originally planned.
  1383. 1:06:46project has three affordable units as
  1384. 1:06:49part of this scope. Um we will be
  1385. 1:06:52looking for a handicap spot on the
  1386. 1:06:54street because there are 10 originally
  1387. 1:06:57property was being marketed with heated
  1388. 1:07:00parking in the rear and found out spots
  1389. 1:07:02aren't heated accurate of the property.
  1390. 1:07:04So the originally planned handicap
  1391. 1:07:06parking in the back is not feasible
  1392. 1:07:08anymore. So we either would like to do
  1393. 1:07:11right in front of the property or paint
  1394. 1:07:13and stripe one across the street and
  1395. 1:07:15we'll miss it belong. If this city would
  1396. 1:07:16do a little bit further, you know, it
  1397. 1:07:18doesn't matter to us. In the rear of the
  1398. 1:07:20property, we are going to have access
  1399. 1:07:22for a full garbage containment as well
  1400. 1:07:24as enclosed bicycle enclosures so that
  1401. 1:07:28we can fit probably one bike for most of
  1402. 1:07:30the tenants. Even though we're only
  1403. 1:07:31required to have two, we're going to
  1404. 1:07:33make it available for everybody's use.
  1405. 1:07:36And we're not changing footturn of the
  1406. 1:07:38property at all. That's rear of the
  1407. 1:07:40property. So, Broadway facing side will
  1408. 1:07:42still look the same. Actually, look
  1409. 1:07:44better because it'll have windows
  1410. 1:07:45finally.
  1411. 1:07:47I'll answer any questions board has. So,
  1412. 1:07:50when you had mentioned about the back of
  1413. 1:07:51the property with the [clears throat]
  1414. 1:07:54trash receptacles and all of that. So,
  1415. 1:07:56the last time it was here, there was an
  1416. 1:07:58easement [clears throat]
  1417. 1:07:59to access the the easements
  1418. 1:08:02non-existent. They never registered it
  1419. 1:08:03when the hospital the original Kingston
  1420. 1:08:05hospital sold the property or the
  1421. 1:08:07easement. The previous owner never got
  1422. 1:08:10that documented on the deed and
  1423. 1:08:12unfortunately it didn't transfer over to
  1424. 1:08:14us. It's not not there. Worst case
  1425. 1:08:17scenario, if and when the hospital
  1426. 1:08:18decides to do something with that lot,
  1427. 1:08:21we can take the garbage that we have
  1428. 1:08:23there and walk it through our ground
  1429. 1:08:24floor corridor and and put it out front
  1430. 1:08:26when our garbage dumpster comes. So
  1431. 1:08:28right now we'll have an enclosure with
  1432. 1:08:30store 4yard container which the dumpster
  1433. 1:08:33company come in open gates pull it out
  1434. 1:08:36dump it put it back in it closed up it
  1435. 1:08:38but and it's not visible we do have a
  1436. 1:08:40small section in the back which we're
  1437. 1:08:42going to make still keep retain the
  1438. 1:08:44originally planned decks and there will
  1439. 1:08:47still be an access point on the back of
  1440. 1:08:49the property so that you in essence can
  1441. 1:08:51walk through through the front and
  1442. 1:08:53that's our main ADA compatibility.
  1443. 1:08:56>> Okay. We also plan on marketing the two
  1444. 1:08:58ground floor apartments as ADA. We're
  1445. 1:09:00required to have one, but we're making
  1446. 1:09:02build ADA accessible.
  1447. 1:09:04Okay.
  1448. 1:09:08>> Now, with the change of the facade on
  1449. 1:09:10the front of the building, first floor,
  1450. 1:09:13this is existing.
  1451. 1:09:15>> Yeah, it's we're not changing anything
  1452. 1:09:17on the facade on the front floor.
  1453. 1:09:18There's an existing roofing canopy.
  1454. 1:09:20We're just going to re- roof it cuz it's
  1455. 1:09:22not in good shape. So this is the rear
  1456. 1:09:24of the property and it had stuckle and
  1457. 1:09:27siding. It had a mish mash of different
  1458. 1:09:29things. So we're going to use a hardy
  1459. 1:09:30plank 9 in white standard look. The
  1460. 1:09:33bottom will retain its masonry on this
  1461. 1:09:35side. The masonry goes up and over here
  1462. 1:09:37it's a wood structure to the top.
  1463. 1:09:40>> But you you were going to enclose that
  1464. 1:09:42front little al cove.
  1465. 1:09:44>> Yes. Oh my god. I totally forgot about
  1466. 1:09:46that. So, right now we have a homeless
  1467. 1:09:48person that likes to use our spot. And
  1468. 1:09:50what we decided to do is bring that
  1469. 1:09:53space towards the street more. We'll
  1470. 1:09:55probably leave it within a foot of its
  1471. 1:09:58of the property line so that we can
  1472. 1:10:00still keep the willp box for the fire
  1473. 1:10:02departments and have their access to it,
  1474. 1:10:04but it would also serve as a wind entry
  1475. 1:10:06for the retail when we rent it out
  1476. 1:10:09>> and eliminate the homeless person
  1477. 1:10:10sleeping there. And then with uh
  1478. 1:10:13mailboxes,
  1479. 1:10:14>> mailboxes right now we have two options.
  1480. 1:10:17One is right here on a sliver just a
  1481. 1:10:19built in. We might make the wall wider
  1482. 1:10:21or right now it's programmed. You walk
  1483. 1:10:23into the corridor and there'll be 10
  1484. 1:10:25mailboxes plus a commercial for the mail
  1485. 1:10:28department to use
  1486. 1:10:29>> in reset inside the wall.
  1487. 1:10:31>> Okay. That would be inside the left.
  1488. 1:10:33>> Inside the left door. Yes. There'll be
  1489. 1:10:35secondary door there. So the mailman can
  1490. 1:10:36get in but he can't go beyond the
  1491. 1:10:38problem.
  1492. 1:10:38>> Okay.
  1493. 1:10:39>> Um if you go to the planet he show it to
  1494. 1:10:41you. And the first floor apartments
  1495. 1:10:43their access from behind.
  1496. 1:10:45>> No, you actually have entrance from the
  1497. 1:10:46front. Okay. If you go to the the
  1498. 1:10:49section that has
  1499. 1:10:51so you would walk in here
  1500. 1:10:54>> and you have a corridor here to this
  1501. 1:10:56unit and you can go to this one, but
  1502. 1:10:58they also have access from the rear if
  1503. 1:11:00you want to. Yeah.
  1504. 1:11:08because we couldn't bank on having this
  1505. 1:11:10always available for handicap entry. We
  1506. 1:11:13originally weren't programmed to have a
  1507. 1:11:15lift there. We ever lose access to that.
  1508. 1:11:17We had to maintain this corridor and we
  1509. 1:11:19had to sacrifice some of this space
  1510. 1:11:21which originally was part of the retail.
  1511. 1:11:22But by doing so, we've maintained access
  1512. 1:11:25in all scenarios
  1513. 1:11:26>> and it's just one retail.
  1514. 1:11:28>> One retail. Okay.
  1515. 1:11:30existing
  1516. 1:11:32750ish square ft.
  1517. 1:11:42Now another question since this takes up
  1518. 1:11:45most of the footprint and there is no
  1519. 1:11:48easement in the back how will
  1520. 1:11:50construction stage with materials and
  1521. 1:11:52equipment and
  1522. 1:11:54>> I can bring everything in through here
  1523. 1:11:56or boom it in.
  1524. 1:11:58We don't have like machines booms to
  1525. 1:12:00bring
  1526. 1:12:01>> when I get I'll have a delivery of
  1527. 1:12:03drywall. That's our biggest item really
  1528. 1:12:04to come in and some 2x4s so we can stage
  1529. 1:12:07it right through the windows. Um I'm led
  1530. 1:12:09to believe with initial conversations
  1531. 1:12:11that the hospital would allow us to take
  1532. 1:12:13deliveries from the back and it wouldn't
  1533. 1:12:15impact this if we have to go to a front
  1534. 1:12:18apply for a permit to park load it and
  1535. 1:12:20then leave. Okay. with flaggers.
  1536. 1:12:31>> Right now the parking lot every time I
  1537. 1:12:33go it's pretty empty. We have the
  1538. 1:12:36parking lot back there. So hopefully
  1539. 1:12:38>> hope it stays that way when we start.
  1540. 1:12:41>> We won't bother anybody to that'll be
  1541. 1:12:43completed fairly soon.
  1542. 1:12:48>> What's your timeline?
  1543. 1:12:50Assuming this gets going in the right
  1544. 1:12:52direction, we would apply for permits
  1545. 1:12:55next week for the first space that's
  1546. 1:12:57already permitted, which is the
  1547. 1:12:58downstairs. We're finalizing the
  1548. 1:13:00drawings with Charlie and hope to have
  1549. 1:13:02something ready for there's an existing
  1550. 1:13:04building right now, which we're going to
  1551. 1:13:05be filing for demo and we want to do the
  1552. 1:13:06roof sooner than later. So, stops
  1553. 1:13:10raining indoors.
  1554. 1:13:11>> We're really hoping
  1555. 1:13:13late spring nicely,
  1556. 1:13:15>> be on the market. Yeah,
  1557. 1:13:18>> but because I'm in the commercial um
  1558. 1:13:21interior material business anyway, so
  1559. 1:13:24that becomes very easy once I have the
  1560. 1:13:26roof and the windows inside the room
  1561. 1:13:29really fast.
  1562. 1:13:31>> Okay,
  1563. 1:13:42>> I think it's great. I think that the we
  1564. 1:13:44don't really see a lot of proposals for
  1565. 1:13:46studios and the fact that you can get
  1566. 1:13:48more housing out of it for people. It's
  1567. 1:13:51>> great.
  1568. 1:13:52>> Lemonade out of London.
  1569. 1:13:54>> Yeah.
  1570. 1:13:54>> That's all we're architect Wesley. He's
  1571. 1:13:57a native Kingston. He said this will be
  1572. 1:14:00so good with it.
  1573. 1:14:01>> Yeah. Yeah. Great location for I think
  1574. 1:14:03and it'll be nice to see that.
  1575. 1:14:04[laughter]
  1576. 1:14:05>> Everybody's looking forward to it.
  1577. 1:14:07>> He said thank you.
  1578. 1:14:09>> Finally.
  1579. 1:14:11Everybody can't wait. Yeah. Yeah.
  1580. 1:14:15>> All right. So,
  1581. 1:14:19>> All right. So, this is a type two. We
  1582. 1:14:22have the
  1583. 1:14:23>> They do have to require because it's 10
  1584. 1:14:28units, you are required to have one unit
  1585. 1:14:31dedicated affordable.
  1586. 1:14:33>> We have three.
  1587. 1:14:33>> We have three.
  1588. 1:14:34>> Yeah.
  1589. 1:14:35>> You'll have to have one deed restricted
  1590. 1:14:36through a covenant. And then uh there
  1591. 1:14:39will be a recting of $5,000
  1592. 1:14:42and um we just recognize potential
  1593. 1:14:45easement in the future. And then board
  1594. 1:14:47policies 4 ending 6 7 11 12 16 A 17 20
  1595. 1:14:5521 28 and 24
  1596. 1:14:58which you will get. [laughter]
  1597. 1:15:00>> Perfect.
  1598. 1:15:01[clears throat] motion. You said the rec
  1599. 1:15:03fee of nine, that was
  1600. 1:15:05>> $9,000 for the recent.
  1601. 1:15:08>> Yeah. The with 10 units, the first six
  1602. 1:15:11are exempt.
  1603. 1:15:12>> And then because the affordable, it's
  1604. 1:15:15exempt as well.
  1605. 1:15:16>> Yes.
  1606. 1:15:18>> They're going to take the other two
  1607. 1:15:20affordable that we're putting into
  1608. 1:15:21consideration.
  1609. 1:15:25>> Takes those not those are dee
  1610. 1:15:27restricted, right?
  1611. 1:15:28>> Yes. Okay. If they're deeed restricted,
  1612. 1:15:30they're
  1613. 1:15:32>> reduced further.
  1614. 1:15:33>> They're preede restricted basically in
  1615. 1:15:36perpetuity
  1616. 1:15:37>> um for as long as the use remains
  1617. 1:15:40residential.
  1618. 1:15:44So that can be adjusted but yeah.
  1619. 1:15:48>> All right. So motion next.
  1620. 1:15:50>> I need a motion.
  1621. 1:15:52>> Kai has a second.
  1622. 1:15:55Sage. All in favor?
  1623. 1:16:01Thank you folks. Really appreciate it.
  1624. 1:16:04>> Look forward to
  1625. 1:16:06>> receiving.
  1626. 1:16:11Have a great evening.
  1627. 1:16:17>> Yeah, we'll send you a letter.
  1628. 1:16:22Thank you.
  1629. 1:16:49I'm not standing
  1630. 1:16:54out with us.
  1631. 1:17:04Okay. Item number 9, 11, 111 Schwank
  1632. 1:17:08drive site plan with associated waiverss
  1633. 1:17:11to demolish the existing building and
  1634. 1:17:13constructs a mixeduse building with
  1635. 1:17:15groundf flooror commercial and
  1636. 1:17:17residential above. SPL48.314-2-23.1
  1637. 1:17:24Secret Determination that's two transect
  1638. 1:17:27zone T5MS
  1639. 1:17:30Lord 2 Ross Hoffman Milestone
  1640. 1:17:33Development applicant CMRC LLC owner
  1641. 1:17:39forward folks
  1642. 1:17:53>> [laughter]
  1643. 1:17:54>> We come from there
  1644. 1:17:57specific.
  1645. 1:18:27Thank you.
  1646. 1:18:28>> Well, welcome folks. And if we could
  1647. 1:18:29just have everyone's name for the
  1648. 1:18:31record.
  1649. 1:18:31>> Yeah, absolutely. Thank you so much for
  1650. 1:18:32having us. Um, I'm Marley Bushin. I'm a
  1651. 1:18:35partner in head of development at
  1652. 1:18:36Milestones.
  1653. 1:18:39Uh this is Martha Bush from Bush. I'm a
  1654. 1:18:41director at Red Marble.
  1655. 1:18:44And Valerie will also be joining us
  1656. 1:18:46James associate marble.
  1657. 1:18:49>> Um we've got Mike Morello who's doing
  1658. 1:18:51our land use uh Paul Ararius who's our
  1659. 1:18:55civil
  1660. 1:18:57O' Conor from RCO partners on the
  1661. 1:18:59project. Uh and a smattering of other
  1662. 1:19:01people and Tim also from RCO my business
  1663. 1:19:04partner Aaron. Um and Sam and Eloise
  1664. 1:19:07Samara Bailey and Eloise Paul from Sik
  1665. 1:19:09Street Advisors to our awesome project.
  1666. 1:19:12>> Okay.
  1667. 1:19:13>> Well, welcome folks. Um this point you
  1668. 1:19:16just want to give us a walk through.
  1669. 1:19:19>> Yeah, absolutely. Um so I think many of
  1670. 1:19:21you know the site as the TIA site.
  1671. 1:19:25[laughter]
  1672. 1:19:25We uh would love for it to be rebranded
  1673. 1:19:27as something else. Um but uh we're
  1674. 1:19:30really excited about this project. We
  1675. 1:19:32are proposing 135 units of all
  1676. 1:19:35affordable housing. Um we are working
  1677. 1:19:39with HCR on the financing for this. So
  1678. 1:19:41we're doing it as a bond and credit
  1679. 1:19:42deal. So that will ensure that it is%
  1680. 1:19:46affordable. We're targeting AMIs between
  1681. 1:19:4940 and 80%. Um and we are hoping to
  1682. 1:19:54close on this about a year from now on
  1683. 1:19:57financing. Um, assuming approvals and
  1684. 1:20:00everything, it's going to look okay. Uh,
  1685. 1:20:02we are including studios to
  1686. 1:20:05three-bedroom units. Um,
  1687. 1:20:08and, uh, as you can see, the building is
  1688. 1:20:11sort of L-shaped. It's got a small
  1689. 1:20:13amount of ground floor retail to comply
  1690. 1:20:15with the zoning of T5 Main Street. Um,
  1691. 1:20:18and we're also currently proposing doing
  1692. 1:20:20the project uh, as mass timber uh, as
  1693. 1:20:23sort of a sustainable building method.
  1694. 1:20:26We have uh geothermal heating and
  1695. 1:20:28cooling uh that we're designing into the
  1696. 1:20:30project and um yeah we uh have over a
  1697. 1:20:36100 spaces of surface parking. The site
  1698. 1:20:38is quite large. It's about 2 acres so
  1699. 1:20:40we're able to accommodate that. Um and
  1700. 1:20:42we think that that will be more than
  1701. 1:20:44enough for the uh population in the
  1702. 1:20:46building. Um, and I will turn it over to
  1703. 1:20:50the architects who will take us through
  1704. 1:20:52more of the specifics. Yeah. If there's
  1705. 1:20:54any questions about product team,
  1706. 1:20:58>> looks like we're just getting the
  1707. 1:21:01graphics up.
  1708. 1:21:17We didn't
  1709. 1:21:35speak.
  1710. 1:21:54So while while they're doing this, this
  1711. 1:21:56is um not only a site plan, but there's
  1712. 1:22:00going to be a small lot line revision
  1713. 1:22:04associated with this because there's a
  1714. 1:22:06piece in the rear that they're going to
  1715. 1:22:08be um studying. ownership of from the
  1716. 1:22:12joint property to the you off the rear
  1717. 1:22:16back here on the site. There's an odd
  1718. 1:22:19sort of triangle uh that cuts into the
  1719. 1:22:22111 site. And so we um have an agreement
  1720. 1:22:26with um Bob Ryan uh who owns the
  1721. 1:22:31property next door to acquire that site
  1722. 1:22:33in conjunction with our closing. And you
  1723. 1:22:35can actually see the triangle sort of
  1724. 1:22:37highlighted on the model. Yeah.
  1725. 1:22:39Computer. So, uh, project highlights,
  1726. 1:22:42which Marley just ran through, just
  1727. 1:22:45mentioned, 100% portable, 135 units, a
  1728. 1:22:48hybrid CLT construction, cross laminated
  1729. 1:22:51timber, uh, geothermal heating and
  1730. 1:22:53cooling. Um, also some interesting site.
  1731. 1:22:56We're actually in flood planes. We're
  1732. 1:22:57doing flood resiliency. The building is
  1733. 1:22:59actually 5 ft above the ground plane, so
  1734. 1:23:02we're going with that. Um, and we're
  1735. 1:23:05providing approximately 10 into parking
  1736. 1:23:07spaces. So, real quickly, I'll go
  1737. 1:23:10through some context and design and then
  1738. 1:23:12get into the building. So, this is where
  1739. 1:23:14it's uh located. So, this is the site
  1740. 1:23:16with that lot line adjustment shown. So,
  1741. 1:23:19we're just outside of the historic
  1742. 1:23:21district here on the other side of the
  1743. 1:23:22hill. Um, and there's the single uh old
  1744. 1:23:27uh car lot there with asphalt around it.
  1745. 1:23:30So when we got into the design, we were
  1746. 1:23:33really taken obviously with the stockade
  1747. 1:23:35district and with front street and wall
  1748. 1:23:37street and kind of looking at the
  1749. 1:23:38qualities of the buildings there um and
  1750. 1:23:41contrasting that with swing drive. So we
  1751. 1:23:43went through and we did a whole of
  1752. 1:23:45looking at the rhythms and the
  1753. 1:23:46proportions of those facades and trying
  1754. 1:23:49to understand what makes those buildings
  1755. 1:23:50have so much character. And then we
  1756. 1:23:53looked at Shank Drive which has a quite
  1757. 1:23:55different typology and suburban
  1758. 1:23:57buildings parking lot, right? So, kind
  1759. 1:23:59of the big question for us is how do we
  1760. 1:24:01bring that character down the building
  1761. 1:24:03over here? Um, and so this is some
  1762. 1:24:06photos of the site if you don't know it
  1763. 1:24:08that well. Uh, so this is the building
  1764. 1:24:09on the back side here. You have all
  1765. 1:24:12these build these trees that are going
  1766. 1:24:13up the hill kind of screen the parking
  1767. 1:24:15lot a little bit and there's existing
  1768. 1:24:17foliage on the other side of the
  1769. 1:24:18building as well. Um, so we're really
  1770. 1:24:22taken with the textures of the town,
  1771. 1:24:24right? all the different history and all
  1772. 1:24:26the details that make up the buildings
  1773. 1:24:27and particularly the adjacent stockage
  1774. 1:24:30district area and we did a whole
  1775. 1:24:32analysis looking at the wealth and
  1776. 1:24:33material history that comes from uh
  1777. 1:24:35Kingston the greater Olster County. So
  1778. 1:24:37we looked at brick, we looked at timber,
  1779. 1:24:40we looked at blue stone and lstone
  1780. 1:24:41masonry, we looked at cement and then
  1781. 1:24:44we, you know, went back to the site um
  1782. 1:24:46and we looked at actually the building
  1783. 1:24:48history uh of the stockate district and
  1784. 1:24:51what the buildings were made out of
  1785. 1:24:53largely brick framing siding and
  1786. 1:24:54concrete and how that changed over time.
  1787. 1:24:57So then when we went to the site, we
  1788. 1:24:59took two what we call bars um and we
  1789. 1:25:02treated one with brick and another with
  1790. 1:25:04a limestone or stone like material.
  1791. 1:25:06We're using a high density panel uh
  1792. 1:25:08which has a texture to it. It's like a
  1793. 1:25:10through material. Um so we defined those
  1794. 1:25:13volumes. We articulated the volumes a
  1795. 1:25:15little bit differently. The brick one
  1796. 1:25:16has this stepping on the front to follow
  1797. 1:25:18the curve. The shank drives so that it's
  1798. 1:25:20not fully set the whole way. We
  1799. 1:25:23connected them uh with this bridge
  1800. 1:25:25across and then finally we articulated
  1801. 1:25:27the volumes by adding some more wood
  1802. 1:25:30into the the building and those kind of
  1803. 1:25:33happen at public spaces within the
  1804. 1:25:35building. Um and then we lifted the back
  1805. 1:25:37portion of the building up so that way
  1806. 1:25:38you get all the parking underneath it.
  1807. 1:25:42>> Uh so that gives us two facade systems
  1808. 1:25:44for the building. Um they're both uh a
  1809. 1:25:47rain screen insulation system but on the
  1810. 1:25:50front it's a a brick uh facade. It's a
  1811. 1:25:52Kingston brick, so it's a bit longer and
  1812. 1:25:54taller. Um, and then on the back is that
  1813. 1:25:58uh highdensity panel that we talked
  1814. 1:26:00about. So, the brick will have headers
  1815. 1:26:02and sills. Um, and then the uh panel
  1816. 1:26:06portion will have some trim around the
  1817. 1:26:09windows to help cast shadows and break
  1818. 1:26:10up the sun as well.
  1819. 1:26:14So, we mentioned that it was hybrid CLT.
  1820. 1:26:16What that means is that the floors are
  1821. 1:26:18made out of cross laminated timber. Um,
  1822. 1:26:20so because of the flood plane here,
  1823. 1:26:23we're building that first floor out of
  1824. 1:26:24concrete. So it's resiliency. It's a
  1825. 1:26:26concrete podium. Um, so above that, you
  1826. 1:26:30see these orange lines here. That will
  1827. 1:26:32be cross laminerated timber flooring,
  1828. 1:26:34which will be exposed in the apartments.
  1829. 1:26:36So this is a similar style project, but
  1830. 1:26:38you can see the wood ceilings there. And
  1831. 1:26:41then the walls themselves will be uh
  1832. 1:26:43light wood framing. So those are spaced
  1833. 1:26:46on a 12x6 module um which act as baron
  1834. 1:26:49and shear walls throughout. Uh and then
  1835. 1:26:52also above the first floor that CLT is
  1836. 1:26:55going to be making up the elevator
  1837. 1:26:57shafts and the stair shafts. So when
  1838. 1:26:59you're in the wood you can see where the
  1839. 1:27:01public spaces are and where you can move
  1840. 1:27:03by seeing the floor.
  1841. 1:27:06Uh so this is a view from the northwest
  1842. 1:27:08um which was on one of the earlier
  1843. 1:27:10slides. This is the retail component uh
  1844. 1:27:12that Marley mentioned. This is the kind
  1845. 1:27:15of burning the sloping that we're using
  1846. 1:27:17to navigate that five foot difference
  1847. 1:27:19and using the landscape to mitigate it.
  1848. 1:27:21So it's not just like a harsh wall in
  1849. 1:27:23front of the building as well. Uh this
  1850. 1:27:26is a view from the southwest in the
  1851. 1:27:28parking lot essentially will be
  1852. 1:27:31that way. And then this is the screening
  1853. 1:27:33into a rear entrance into that amenity
  1854. 1:27:35courtyard um that was mentioned. And you
  1855. 1:27:38can start to see some of the amenity
  1856. 1:27:40rooftop chairs if possible.
  1857. 1:27:43And then looking at the northeast, you
  1858. 1:27:44can see the drive aisle. So that takes
  1859. 1:27:46you back into the parking two spaces.
  1860. 1:27:48And then here you get a kind of clear
  1861. 1:27:50view of the residential entrance. So
  1862. 1:27:52again, anywhere where there's kind of
  1863. 1:27:54public movement, that's where we start
  1864. 1:27:55to bring in the wood and bring that in
  1865. 1:27:56from the outside. Um, and then here you
  1866. 1:27:59see the stepping of the building itself.
  1867. 1:28:00It's stepping 2 and 1/2 in 2 and 1/2 ft
  1868. 1:28:03increments. And so that creates kind of
  1869. 1:28:05the natural canopy so they don't need to
  1870. 1:28:07tap anything else on to the facade.
  1871. 1:28:11And then this is a view from the
  1872. 1:28:13courtyard. Kind of initial early sketch
  1873. 1:28:15we did, but gives you an idea of the
  1874. 1:28:17amenity spaces that we'll be wrapping
  1875. 1:28:19this courtyard. So you'll have your
  1876. 1:28:20lounge off of it. Uh you'll have your
  1877. 1:28:22laundry and your gym. Um and then you
  1878. 1:28:25can kind of see some of the CLT coming
  1879. 1:28:27through the windows up there.
  1880. 1:28:30Uh this is a ground floor plan zoomed in
  1881. 1:28:33on the first floor of the building
  1882. 1:28:35itself. So this was the courtyard that
  1883. 1:28:37we were just looking at. You have your
  1884. 1:28:38amenity spaces wrapping it with this
  1885. 1:28:40corridor so that there's always natural
  1886. 1:28:42light coming into that. Um, and then you
  1887. 1:28:44have your main entrance here in the
  1888. 1:28:46north, which is what we looked at with
  1889. 1:28:47the ramp, the stairs, the retail, and
  1890. 1:28:50the residential entrance on the same
  1891. 1:28:51level. So, they're both at that 5ft
  1892. 1:28:54uh elevation. And then there is a rear
  1893. 1:28:57entrance from the parking area that has
  1894. 1:28:59both a ramp and stairs as well. Um, on
  1895. 1:29:02the ground floor, we also have like our
  1896. 1:29:05water meter, electrical service room. Up
  1897. 1:29:06here in the corner, we have a compactor
  1898. 1:29:09room um which will carry 30 toers which
  1899. 1:29:12will be brought and will be staged and
  1900. 1:29:13back. We're working with our management
  1901. 1:29:16on that.
  1902. 1:29:18And then the typical floor these will
  1903. 1:29:20run through two through six. Um so these
  1904. 1:29:23have the studios, the one beds, the two
  1905. 1:29:24beds and the three beds. Uh this repeats
  1906. 1:29:27per the floor or per every floor. So
  1907. 1:29:29there's an elevator bank here in the
  1908. 1:29:31north. You have your stair here in the
  1909. 1:29:32north and another stair in the south. So
  1910. 1:29:34those run
  1911. 1:29:36back
  1912. 1:29:38down so that stair A goes out and exits
  1913. 1:29:41through there and stair B can exit out
  1914. 1:29:43here. And stair B actually exits out
  1915. 1:29:45above the flood plane. Um, which is just
  1916. 1:29:49kind of a, you know, in case there is a
  1917. 1:29:52flood. That way you're not opening the
  1918. 1:29:53boat right under the water.
  1919. 1:29:57And then on the roof, we have an amenity
  1920. 1:29:59terrace in the bar portion in the center
  1921. 1:30:01there. Uh, and then we have the stairs
  1922. 1:30:03on either side.
  1923. 1:30:05Because we're using a geothermal system,
  1924. 1:30:08we don't actually have that much
  1925. 1:30:09equipment on the roof. So, we have two
  1926. 1:30:11ERVs in the north and two ERVs in the
  1927. 1:30:14south. And then there's a a generator
  1928. 1:30:16that will be on the north on the ones.
  1929. 1:30:21So, as part of this, we are going for
  1930. 1:30:24seven uh waiverss. Three of them are
  1931. 1:30:28major and four minor. The first one um
  1932. 1:30:32is the build two zone. So as of right
  1933. 1:30:35with the affordability bonus we can
  1934. 1:30:37build up to six stories uh for the first
  1935. 1:30:4080 ft. So that's essentially roughly
  1936. 1:30:42this far and be brought up to six
  1937. 1:30:45stories. Um what we're looking to do is
  1938. 1:30:47to continue that across so that we get
  1939. 1:30:51more affordable units here in the back
  1940. 1:30:53side. Um the second major waiver is a
  1941. 1:30:56distance between lazing. So, per zoning,
  1942. 1:31:00just jump back to that view.
  1943. 1:31:03Per zoning, this portion of the facade
  1944. 1:31:06needs to be 2 ft wide. Uh, we're showing
  1945. 1:31:08it as four to keep a proportional rhythm
  1946. 1:31:10with the rest of the building. Um, and
  1947. 1:31:12also to capture the structural column
  1948. 1:31:14that's coming down better.
  1949. 1:31:18The third major waiver is curb cut
  1950. 1:31:22width. Uh, per the zoning, the maximum
  1951. 1:31:24curb cut is 20 ft wide. We are showing
  1952. 1:31:27currently a 24 ft per cuff lid and the
  1953. 1:31:29arrows to 20 ft and a dry after you
  1954. 1:31:31would be on the street. Uh the four
  1955. 1:31:34minor waivers are for the front build to
  1956. 1:31:36zone. So first one is per the zoning the
  1957. 1:31:40building needs to be within 5 ft of the
  1958. 1:31:43curve or the property line but because
  1959. 1:31:45of the flood uh resiliency we need the
  1960. 1:31:49space to get up into the building. So
  1961. 1:31:52we're trying to set that back. Uh the
  1962. 1:31:54building width uh the the zoning permits
  1963. 1:31:58150 ft. So we're less than 10% older,
  1964. 1:32:00but we're a little bit wider. This far
  1965. 1:32:01is 162 ft. Um and then there is a blank
  1966. 1:32:05wall on the ground floor
  1967. 1:32:10here. So, in order to get this drive out
  1968. 1:32:12here so that the drug cars can come
  1969. 1:32:14through, that means that we need to put
  1970. 1:32:16the front-facing uh utility entry here
  1971. 1:32:20um instead of being able to like break
  1972. 1:32:21it up or put something in between. Uh so
  1973. 1:32:24that creates uh a blank wall that's a
  1974. 1:32:27little bit larger, but we're
  1975. 1:32:28articulating that with different
  1976. 1:32:29materials and potentially putting
  1977. 1:32:31signage there.
  1978. 1:32:32>> Can you show that blank wall on the
  1979. 1:32:34record?
  1980. 1:32:35>> Is that Yeah, it's
  1981. 1:32:38here.
  1982. 1:32:39>> Okay. So our thought is like we can add
  1983. 1:32:41signage here adjacent to it and then use
  1984. 1:32:43the landscaping to soften that. Um so
  1985. 1:32:46that way it's not just a big a stretch.
  1986. 1:32:52And then the fourth waiver is related to
  1987. 1:32:55sign uh per the zoning. The letter of it
  1988. 1:32:58says that the wall signage needs to be
  1989. 1:33:00uh above the storefront. we're showing
  1990. 1:33:03it as adjacent uh in our drawings, which
  1991. 1:33:06if I can pull those up, but um that's
  1992. 1:33:09largely because here the storefront runs
  1993. 1:33:10all the way to the top. So, we have this
  1994. 1:33:12signage here to help break up that uh
  1995. 1:33:17blank wall facade. Um whereas it'll be
  1996. 1:33:20above the the storefront for the retail.
  1997. 1:33:24And then this is the overall site plan.
  1998. 1:33:28So, this has the 100G parking spaces,
  1999. 1:33:30the EV spaces here to the south. The
  2000. 1:33:32bike parking will be uh under the
  2001. 1:33:35overhang of the building adjacent to the
  2002. 1:33:38back entry. Um, and then we have our ADA
  2003. 1:33:41spaces here as well.
  2004. 1:33:42Uh Paul, was there anything else with
  2005. 1:33:44the
  2006. 1:33:46um I'll just say quickly uh with
  2007. 1:33:50redeveloping a largely imperous site uh
  2008. 1:33:53and actually reducing by 8% the
  2009. 1:33:56impervious area. [snorts] Um I have
  2010. 1:33:59verified in communication with the city
  2011. 1:34:01engineer the base flood elevation we're
  2012. 1:34:04using of 155.4.
  2013. 1:34:06So the finished floors are all 2 ft
  2014. 1:34:09above that.
  2015. 1:34:11um and happy to answer any questions
  2016. 1:34:14regarding our our civil site plan or
  2017. 1:34:16engineering related issues. Can you just
  2018. 1:34:20um speak to just a little bit about how
  2019. 1:34:22right now there is storm water that kind
  2020. 1:34:25of runs through the site that connects
  2021. 1:34:27other properties as well and how that's
  2022. 1:34:30going to all be redirected and on an
  2023. 1:34:33interim when the construction is
  2024. 1:34:35happening on this site how the storm
  2025. 1:34:39water is going to be addressed from the
  2026. 1:34:41adjacent sites and then does it back up
  2027. 1:34:43there?
  2028. 1:34:44>> Sure. Um, so we have, I believe, four
  2029. 1:34:47connections. There's a small catch basin
  2030. 1:34:50from Bob Ryan's property that goes into
  2031. 1:34:53a basin on our site. We have a small
  2032. 1:34:56basin from the teachers union on the
  2033. 1:35:01adjacent site who have an easement here
  2034. 1:35:03and a small 6-in line that comes onto
  2035. 1:35:06our site. And then there's uh one other
  2036. 1:35:09line from the Federal Credit Union that
  2037. 1:35:12actually won't be affected. We'll be
  2038. 1:35:14rrooting the storm. I could maybe show
  2039. 1:35:17it better on a different plan. Um, so
  2040. 1:35:20it's really just these two basins which
  2041. 1:35:22are essentially overflows from a dry
  2042. 1:35:24well system on this property adjacent.
  2043. 1:35:28Um, not really concerned about during
  2044. 1:35:32construction.
  2045. 1:35:34They would go from downstream and back.
  2046. 1:35:38So these would by the time these are
  2047. 1:35:40tied back in they they would be
  2048. 1:35:43connected to the frog alley system that
  2049. 1:35:46discharges that way. Um if we have to do
  2050. 1:35:50any temporary bypass
  2051. 1:35:53uh if there's a storm and they're not
  2052. 1:35:55connected in the couple days while we're
  2053. 1:35:58reconnecting these these 6-in lines. Uh
  2054. 1:36:02we'll we'll do that as needed.
  2055. 1:36:05And you're proposing a new um
  2056. 1:36:09the name of it,
  2057. 1:36:10>> a hydrodnamic separator. Great.
  2058. 1:36:12>> Thank you.
  2059. 1:36:13>> That'll that'll help us meet our water
  2060. 1:36:16quality volume treatment, right? For the
  2061. 1:36:17slip uh redevelopment slip. Um allows
  2062. 1:36:21for the use of those and that's that'll
  2063. 1:36:23be here right before going out the frog
  2064. 1:36:26alley. Um and that will be able to
  2065. 1:36:29convey the 100year storm flow while
  2066. 1:36:32while treating the storm water. Um
  2067. 1:36:35>> I don't know if the board is familiar
  2068. 1:36:37with that. Can you just kind of describe
  2069. 1:36:38the system because I don't think it's
  2070. 1:36:40something that
  2071. 1:36:40>> Sure. It's more of a mechanized uh
  2072. 1:36:43system. Um that's like a swirl um I I
  2073. 1:36:50call it a filter filtration system that
  2074. 1:36:52that treats storm water and and
  2075. 1:36:54discharges a a cleaner uh storm water.
  2076. 1:36:57We used one at Benedict 18 and we've
  2077. 1:37:01used them all over for redevelopment
  2078. 1:37:03projects. It's I think a 6ft diameter
  2079. 1:37:07looks like a looks like a dry well but
  2080. 1:37:09it has a it it's mechanized and and
  2081. 1:37:13provides our treatment through
  2082. 1:37:15>> filtration serviced or emptied.
  2083. 1:37:18>> There's there's some maintenance
  2084. 1:37:20requirements. Um I'm sure every 5 to 10
  2085. 1:37:24years I I have to check the exact Yeah.
  2086. 1:37:28the the building is anticipating having
  2087. 1:37:29a living superintendent. Okay. So,
  2088. 1:37:32maintenance should be easily covered.
  2089. 1:37:40>> Yeah. So, if there any questions for
  2090. 1:37:48>> So, just for the members, we obviously
  2091. 1:37:51you've got staff notes. Um, we did send
  2092. 1:37:54the staff counts out to you all. I'm
  2093. 1:37:57sure started to look at them and digest
  2094. 1:37:59them and we'll be making
  2095. 1:38:03comments back on them. Or if you have
  2096. 1:38:05any questions for us about anything that
  2097. 1:38:08is within those, let us know um before
  2098. 1:38:12next month. Um, this does need to go to
  2099. 1:38:16the county. So I do want the board to um
  2100. 1:38:19if they're comfortable with the level of
  2101. 1:38:21information I think it's developed we
  2102. 1:38:23think it's developed enough to send out
  2103. 1:38:26the formal community having planning
  2104. 1:38:28board um so that we can do that next
  2105. 1:38:30month I think also I would ask the board
  2106. 1:38:33at public hearing um there's obviously
  2107. 1:38:36one required by law for the lot line
  2108. 1:38:39revision that is part of project a site
  2109. 1:38:42man public hearing is also in order on
  2110. 1:38:46this Um the other thing um just as we
  2111. 1:38:48talked about with the 25 bill court one,
  2112. 1:38:51I think that there should be some um uh
  2113. 1:38:55more visual simulations done. Um I'd
  2114. 1:38:58like the board to think about and maybe
  2115. 1:39:01tonight come up with a couple of
  2116. 1:39:04locations that you know as you're coming
  2117. 1:39:06down schwank or going up you know either
  2118. 1:39:09direction on schwank. kind of it would
  2119. 1:39:10be appropriate to have some uh visual
  2120. 1:39:14simulations both day and night um with
  2121. 1:39:18building context of existing buildings
  2122. 1:39:21in place um and also maybe from up above
  2123. 1:39:25to get a sense of need from the historic
  2124. 1:39:29district. So I don't know what are the
  2125. 1:39:32board's thoughts on that?
  2126. 1:39:37I mean, this is a six-story building
  2127. 1:39:40primarily a one-story area. So,
  2128. 1:39:44especially the front street just to see
  2129. 1:39:46what it'll do to the view. That'll be
  2130. 1:39:48one location
  2131. 1:39:51to see.
  2132. 1:39:59>> So, the the parking lot on on North
  2133. 1:40:01Front Street is right
  2134. 1:40:03>> this is the guard rail.
  2135. 1:40:04>> That plaza is down here.
  2136. 1:40:06>> Yeah. Yeah. from Sun Street. It's due to
  2137. 1:40:09the mature trees that are sort of on
  2138. 1:40:11that slope up to the parking lot, they
  2139. 1:40:13actually provide quite a bit of
  2140. 1:40:15screening from Front Street.
  2141. 1:40:18Um, but that's sort of the perspective
  2142. 1:40:20there.
  2143. 1:40:21>> Yeah, this is the parking lot.
  2144. 1:40:23>> Do we know the grade change between the
  2145. 1:40:26our parking lot and the parking lot?
  2146. 1:40:30>> Yeah.
  2147. 1:40:36We go from 180 to about what? What are
  2148. 1:40:39we at? 154
  2149. 1:40:41155.
  2150. 1:40:42>> Yeah.
  2151. 1:40:44>> 5T.
  2152. 1:40:49>> I just I think it's important um to have
  2153. 1:40:52those simulations particularly because
  2154. 1:40:55one of the waiver requests is to have
  2155. 1:40:59both the bit and the six floor extending
  2156. 1:41:02feedback
  2157. 1:41:04um all the way to the rear of the
  2158. 1:41:06building which is quite a large
  2159. 1:41:10deviation um waiver request I was it's
  2160. 1:41:13close to 200% and so I think it's
  2161. 1:41:17important to understand
  2162. 1:41:19uh visually and different
  2163. 1:41:26viewpoints.
  2164. 1:41:30>> Sure. And we can also show it in context
  2165. 1:41:32with the Kingstonian which will also be
  2166. 1:41:35bring
  2167. 1:41:36there
  2168. 1:41:38>> and the
  2169. 1:41:41guy mentioned it but the reason to bring
  2170. 1:41:43that waiver why we're requesting that is
  2171. 1:41:46we get about
  2172. 1:41:4830
  2173. 1:41:49>> additional units of affordable housing
  2174. 1:41:52and so it it has a lot of implications.
  2175. 1:41:55um if we were to lose those units, we'd
  2176. 1:41:57likely be pushed into the HCR 9% uh
  2177. 1:42:01financing program, which then is
  2178. 1:42:03competitive, which you know, I can't say
  2179. 1:42:06when we would close with that. And so,
  2180. 1:42:08keeping our building at a certain scale,
  2181. 1:42:11helps on multiple fronts.
  2182. 1:42:14>> Yeah, doing the housing with those, you
  2183. 1:42:17know, I think it's imperative that we
  2184. 1:42:18look at all opportunities, but we'll
  2185. 1:42:20definitely do those visuals that you
  2186. 1:42:22requested. Let me know if the parking
  2187. 1:42:24lot is uh been put out in RP and
  2188. 1:42:28responses to develop on that which will
  2189. 1:42:30alter greatly
  2190. 1:42:33any use should a uh should a building be
  2191. 1:42:36put on that parking lot.
  2192. 1:42:38>> We'll get various board.
  2193. 1:42:41>> Yeah, absolutely. So, yeah, we can take
  2194. 1:42:43one from that parking lot. There are
  2195. 1:42:44other areas that
  2196. 1:42:45>> we have seen the intersection.
  2197. 1:42:50Uh no other other interception just
  2198. 1:42:53went.
  2199. 1:42:54>> Yeah.
  2200. 1:42:54>> Yeah.
  2201. 1:43:10How
  2202. 1:43:12going to be
  2203. 1:43:14solely sourced through RO?
  2204. 1:43:18>> We will be the managing agent. Um but
  2205. 1:43:23this market
  2206. 1:43:25for the
  2207. 1:43:30>> and we'll do you know it's always been
  2208. 1:43:32our president to notify the community as
  2209. 1:43:35much as we can that the lottery is
  2210. 1:43:36active to you know encourage as many
  2211. 1:43:39applications especially locally as we
  2212. 1:43:41can. Um you know we want people who live
  2213. 1:43:44in Kingston who need an affordable home
  2214. 1:43:46to be the first people to apply for
  2215. 1:43:48this. So, if there's any suggestions of
  2216. 1:43:50organizations you'd like to see us do
  2217. 1:43:52outreach to, we're happy to consider
  2218. 1:43:54that and make sure that we tell them
  2219. 1:43:56that the lottery is active and even give
  2220. 1:43:58them heads up. You know, in the past,
  2221. 1:44:00we've done even trainings on like this
  2222. 1:44:02is how you've actually applied for it
  2223. 1:44:03when it's a complicated lottery system,
  2224. 1:44:05things like that.
  2225. 1:44:09>> So, the the parking um demand um and
  2226. 1:44:12redemption study, they came in late.
  2227. 1:44:15they just quickly reviewed it and a
  2228. 1:44:17couple things. Um,
  2229. 1:44:20and I'm I'm thinking that, you know,
  2230. 1:44:22what might be nice to incorporate into
  2231. 1:44:25the project would be maybe a bus shelter
  2232. 1:44:28along the public railway to encourage,
  2233. 1:44:31you know, ridership um or place for
  2234. 1:44:34them. uh maybe um but it's not you know
  2235. 1:44:38I know you said you would provide
  2236. 1:44:40information to resonance but I'm not
  2237. 1:44:44seeing the the intramodal kind of
  2238. 1:44:47connectivity that I would like to see
  2239. 1:44:49enough study identified
  2240. 1:44:51>> sure and we can certainly talk to uh bus
  2241. 1:44:54operator here and see if there is an
  2242. 1:44:56opportunity for that and at the very
  2243. 1:44:58least do way finding you know if they
  2244. 1:45:00say we don't want a bus shelter there
  2245. 1:45:01but do way finding you know bus stop 100
  2246. 1:45:04ft this way, whatever it is, certainly
  2247. 1:45:06want to encourage um multimodal transit.
  2248. 1:45:12>> Man, with this being in the flood plane,
  2249. 1:45:15what are there any specialized
  2250. 1:45:17construction techniques that you're
  2251. 1:45:19going to use to put pilings in or how is
  2252. 1:45:23the support going into the brown to
  2253. 1:45:26bedrock or what's that look like? So,
  2254. 1:45:30our structural engineer is still working
  2255. 1:45:31on that based off the geotech report.
  2256. 1:45:33But um the basic feedback that we've
  2257. 1:45:35gotten is because we're we're building
  2258. 1:45:37up uh the 5T uh to do it with fill so
  2259. 1:45:41that we're on slab. Um so that that
  2260. 1:45:45would prevent having to wet flood proof
  2261. 1:45:48anything. Um so currently uh the piles
  2262. 1:45:53are are pretty standard. Um the deaths
  2263. 1:45:56will be based off of the geotech report.
  2264. 1:45:58Um in terms of like flood resiliency,
  2265. 1:46:00there isn't a lot extra that we have to
  2266. 1:46:02do because we're doing a a pile system
  2267. 1:46:05here.
  2268. 1:46:09>> Yeah.
  2269. 1:46:14So would you be doing um so for the
  2270. 1:46:18pilings would you be doing you' be doing
  2271. 1:46:20compacting right from what I understood
  2272. 1:46:22reading the geotech like they would be
  2273. 1:46:25compacting the soils
  2274. 1:46:27>> that's our understanding
  2275. 1:46:28>> okay
  2276. 1:46:32>> um would you be doing any surveying of
  2277. 1:46:35the adjacent properties or monitoring
  2278. 1:46:38any of the buildings that are
  2279. 1:46:40>> Absolutely. Yeah, you know normal course
  2280. 1:46:43of doing this we'll do a
  2281. 1:46:44pre-construction survey of you know our
  2282. 1:46:46geotech engineer or structural engineer
  2283. 1:46:48will recommend which properties how far
  2284. 1:46:50it should extend and then we'll do
  2285. 1:46:52vibration monitoring optical monitoring
  2286. 1:46:54whatever is necessary for their
  2287. 1:46:56recommendations.
  2288. 1:47:02So do you I have listed in the attendant
  2289. 1:47:06the New York State Park art parks
  2290. 1:47:07recreation start reservation as a
  2291. 1:47:10circulating
  2292. 1:47:12uh agency. Do you guys anticipate
  2293. 1:47:15reaching out to them through Chris?
  2294. 1:47:17Because the reason I ask is because what
  2295. 1:47:20I found have been happening more and
  2296. 1:47:22more recently is once DEC gets it in
  2297. 1:47:25their system it takes several months
  2298. 1:47:28then it goes to PRP and then it's like 5
  2299. 1:47:32months later you get a letter that says
  2300. 1:47:34oh we want to see everything. So do you
  2301. 1:47:36guys go to Chris right in the beginning?
  2302. 1:47:39Should we do it? Should we
  2303. 1:47:43>> I typically only would have if we were
  2304. 1:47:45doing the coordinating review which this
  2305. 1:47:48is not we're treating this as the thing
  2306. 1:47:50too we are
  2307. 1:47:51>> yeah my concern my concern is that
  2308. 1:47:53they're going to get it and then say
  2309. 1:47:56okay we're commenting I mean even though
  2310. 1:47:58they're not interested agency
  2311. 1:48:02>> the like if you're going for state
  2312. 1:48:04funding um financ
  2313. 1:48:06It's going to be in the system that
  2314. 1:48:08agency may referral process.
  2315. 1:48:12>> Well, most
  2316. 1:48:14but you don't you we can do it anyway.
  2317. 1:48:17All right.
  2318. 1:48:17>> Well, we can check in with HDR.
  2319. 1:48:20>> I just don't want to find out like five
  2320. 1:48:22to six months.
  2321. 1:48:23>> Neither do I.
  2322. 1:48:25I don't want to have a shovel ready
  2323. 1:48:27project that that is the home for
  2324. 1:48:31um and Sue you had mentioned uh sending
  2325. 1:48:35referring this to the county. We did
  2326. 1:48:37have our gateway meeting um with Dennis
  2327. 1:48:39Doyle a couple weeks ago. Um no
  2328. 1:48:42substantial comments came out of that.
  2329. 1:48:44We learned about um Dennis's personal
  2330. 1:48:46feelings on the brick.
  2331. 1:48:51That that was the most controversial
  2332. 1:48:53thing out of there.
  2333. 1:49:02personally.
  2334. 1:49:13>> Okay. So, where
  2335. 1:49:18did he eat?
  2336. 1:49:20>> Yes, he's
  2337. 1:49:21>> okay. So when you were making the
  2338. 1:49:23visuals, you want to see visuals from
  2339. 1:49:26the intersections of Waza and Schwank
  2340. 1:49:32looking towards this project. Um
  2341. 1:49:35>> Frog Alley,
  2342. 1:49:36>> Frog Alley and Schwank. And then up
  2343. 1:49:38above from Broadfront Street looking
  2344. 1:49:41down. any any other
  2345. 1:49:43>> I think I'd like to see just kind of
  2346. 1:49:44like a side with the onestory buildings
  2347. 1:49:47like how tall the six stories will look
  2348. 1:49:50compared next to
  2349. 1:49:51>> okay
  2350. 1:49:52>> you know like Ryan in next you know what
  2351. 1:49:54I'm saying like something where we can
  2352. 1:49:56see
  2353. 1:49:56>> the surrounding property
  2354. 1:50:04>> um I would do them in both nighttime and
  2355. 1:50:08daytime
  2356. 1:50:10But I think the night time particularly
  2357. 1:50:13because if you're going to have the um
  2358. 1:50:16top have that open area
  2359. 1:50:20the lights and how that might impact.
  2360. 1:50:23>> Yeah. We're also just doing um EGC as
  2361. 1:50:27part of the HCR process. So we are
  2362. 1:50:29following the uh dark side standards and
  2363. 1:50:31the lighting. So as is we're trying to
  2364. 1:50:34mitigate any kind of light spill off. So
  2365. 1:50:37uh we've been white. So we'll we'll give
  2366. 1:50:41you some illustrations of
  2367. 1:50:46>> anything else.
  2368. 1:51:04Now, if everything goes to plan
  2369. 1:51:09if what are [clears throat] the
  2370. 1:51:10timelines you guys are looking at?
  2371. 1:51:14>> Sure. Um, so we have a pretty aggressive
  2372. 1:51:19design schedule. We're currently on
  2373. 1:51:21pause until we get the feedback from the
  2374. 1:51:24planning board. But, uh, when we resume,
  2375. 1:51:27uh, we'll be resuming with design
  2376. 1:51:28development. Um, and we have a schedule
  2377. 1:51:31that will get us to 100% CD bronze by
  2378. 1:51:35the spring. Um, in our conversations
  2379. 1:51:38with HCR, we've been talking about a
  2380. 1:51:43late summer closing. Um, and we have
  2381. 1:51:46also been talking since the tax credit
  2382. 1:51:49project, we need tax credit investor. Um
  2383. 1:51:52we currently have a couple of in
  2384. 1:51:54investors who are interested and are
  2385. 1:51:56holding us our project in their 27
  2386. 1:51:58pipeline. Um tax credit equity has
  2387. 1:52:00gotten very tight in the past couple of
  2388. 1:52:02years and so we wouldn't be able to
  2389. 1:52:05consider a financial closing
  2390. 1:52:06[clears throat] without also having that
  2391. 1:52:07sort of piece lined up.
  2392. 1:52:11>> And then we're underwriting a 30month
  2393. 1:52:14construction timeline I believe.
  2394. 1:52:18Oh, excuse me.
  2395. 1:52:20>> Um,
  2396. 1:52:21>> sorry. I think it's 24. I'm sorry. I'm
  2397. 1:52:24inflating projects.
  2398. 1:52:25>> The fire chief did have some comments
  2399. 1:52:27that I did upload. I don't know. You You
  2400. 1:52:31should get notification when the upload.
  2401. 1:52:33>> Yeah, I was reviewing the certain.
  2402. 1:52:35>> I just want to make sure you were okay
  2403. 1:52:36because he has some height.
  2404. 1:52:38>> Yeah.
  2405. 1:52:39>> Did look at that. I know the the minimum
  2406. 1:52:42truck height is 16 ft. Our pass through.
  2407. 1:52:45We're only 18 ft right now under the
  2408. 1:52:48building itself.
  2409. 1:52:50>> Uh the it does vary because of the
  2410. 1:52:52slight grade change, but it's always at
  2411. 1:52:55like 16T 9 to 17t.
  2412. 1:52:58>> Okay.
  2413. 1:52:58>> Um some of those
  2414. 1:53:00>> there is some room in there so we can
  2415. 1:53:01play with the design of that as develop
  2416. 1:53:04it further.
  2417. 1:53:04>> And we've been in contact with the
  2418. 1:53:06chief.
  2419. 1:53:07>> We met with Chris and he actually asked
  2420. 1:53:10for a
  2421. 1:53:12proposed swing gate. We uh so we ditched
  2422. 1:53:15two parking spots there for now and uh
  2423. 1:53:18because this is the fire
  2424. 1:53:19>> Yes.
  2425. 1:53:20>> Will fire department there
  2426. 1:53:23>> and then the other comments were mostly
  2427. 1:53:25regarding the building and alarmed.
  2428. 1:53:28>> Yeah. Yeah. System
  2429. 1:53:32>> commercial
  2430. 1:53:34layout
  2431. 1:53:36see those.
  2432. 1:53:37>> Yeah, definitely.
  2433. 1:53:39>> Sometimes we don't know that we say we
  2434. 1:53:41>> Yeah. You upload it and you hope the
  2435. 1:53:42notification goes up. [laughter]
  2436. 1:53:44>> Those things are always got buried.
  2437. 1:53:48>> So the referrals are kind of vending
  2438. 1:53:49more you guys will take care of and
  2439. 1:53:52setting the public hearing.
  2440. 1:53:53>> Do you know what day that'll be the
  2441. 1:53:55public hearing?
  2442. 1:53:56>> Uh next meeting November
  2443. 1:54:0216.
  2444. 1:54:09November 16.
  2445. 1:54:13>> You guys
  2446. 1:54:18will
  2447. 1:54:21soon be public hearing.
  2448. 1:54:29>> Do you have any staff notes that we
  2449. 1:54:32sent?
  2450. 1:54:33>> No, I think they were all pretty strict
  2451. 1:54:35in this room. So if there's anything
  2452. 1:54:37that comes up as we develop.
  2453. 1:54:39>> Okay. We're I'm still pulling from water
  2454. 1:54:44sewer engineering facilities. I'll make
  2455. 1:54:47sure we try and get those to you as
  2456. 1:54:49possible.
  2457. 1:54:51So you'll notice both.
  2458. 1:54:55Yes.
  2459. 1:55:15>> Thank you so much.
  2460. 1:55:17>> Thank you.
  2461. 1:55:19have to make the table.
  2462. 1:55:21>> All right. Make a motion on the table
  2463. 1:55:22and then this will
  2464. 1:55:30>> work.
  2465. 1:55:34All in favor
  2466. 1:55:59>> I was here for so long today.
  2467. 1:56:03Yeah. But
  2468. 1:56:06then I'm also using
  2469. 1:56:12so advertisement
  2470. 1:56:15[laughter]

About this transcript

This page contains the full transcript of Planning Board Meeting by City of Kingston, generated from the public captions YouTube serves with the video. The transcript has 14,833 words across 2,470 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.