Millworks Technologies Ltd.: Precision Engineering for Aerospace, Defence, Railways & Semiconductor — Transcript

by Konexio Network · 6,089 words · 993 segments · language en · Watch on YouTube

Full transcript

  1. 0:00[music]
  2. 0:14>> Uh welcome friends. My name is Avinash
  3. 0:17Gorakshakar and I welcome all of you to
  4. 0:19another interesting episode of Connect
  5. 0:21here Highfliers. Friends, as all of you
  6. 0:23are aware in these episodes we introduce
  7. 0:25to you emerging companies from emerging
  8. 0:27sectors and we make it a point to talk
  9. 0:29to the promoters and the top managements
  10. 0:31of such companies and this helps us to
  11. 0:33get first hand information which is very
  12. 0:36helpful for all the investors in
  13. 0:37understanding the company's business
  14. 0:39model, their growth journey, their
  15. 0:41future growth plans and aspirations and
  16. 0:44this helps all our investors in a very
  17. 0:45fruitful manner. And friends, today
  18. 0:47we're going to talk about another
  19. 0:48interesting company which is going to
  20. 0:50hit the capital market very soon. The
  21. 0:52company today we are going to talk is
  22. 0:53Bilworks Technologies Limited
  23. 0:55and I have the privilege and pleasure of
  24. 0:57having the promoter and managing
  25. 0:59director Mr.
  26. 1:01Shidarji, welcome to the show. It's my
  27. 1:03pleasure to host you and thank you for
  28. 1:05your time.
  29. 1:06>> Uh thank you very much Mr. Avinash
  30. 1:10for hosting. Thank you very much.
  31. 1:13>> Yeah.
  32. 1:14So Shidarji, first question which is
  33. 1:16very elementary, if you could just
  34. 1:17explain to us in a simple way what is
  35. 1:19exactly our company's business model?
  36. 1:22What are the precision components, you
  37. 1:24know, which we develop for a host of
  38. 1:26sectors like railways, aerospace,
  39. 1:28defense, semiconductors? If you could
  40. 1:30just give us a small overview and
  41. 1:33to add it to that Shidarji, if you could
  42. 1:35tell us, you know, how did this business
  43. 1:36journey start? I presume it's a first
  44. 1:38generation company. So how did it hit
  45. 1:40upon you to get into this business? So
  46. 1:42please if you can begin.
  47. 1:44>> Perfect. So I'll start off with
  48. 1:47our journey
  49. 1:49when we started off, you know, in 2021.
  50. 1:53You know, my passion and uh partner Mr.
  51. 1:56Madhu's passion has been in CNC
  52. 1:58machining
  53. 2:00to make you know we are basically
  54. 2:01mechanical engineers and uh shop floor
  55. 2:04people. And
  56. 2:06you know with our corporate experience
  57. 2:08of more than 30 years, we thought that
  58. 2:10you know it's time that you know we do a
  59. 2:13little bit for the country in
  60. 2:15and then be on our own in the
  61. 2:17entrepreneur's spirit. And then we
  62. 2:19started growing organically over the
  63. 2:21period of years.
  64. 2:23So uh Mill Works Technologies Limited,
  65. 2:26we are very clear on our business model.
  66. 2:30Uh we have two enabled business models.
  67. 2:33One is built to print. So last 5 to 6
  68. 2:36years you know prior to Mill Works
  69. 2:39formation also
  70. 2:41built to print has been our you know
  71. 2:43basic things. The customer here gives us
  72. 2:47uh the drawings and 3D models. So we
  73. 2:51make a feasibility study of those you
  74. 2:54know how to manufacture on a three-axis,
  75. 2:56four-axis, or five-axis machine. We make
  76. 2:58a feasibility, then give a quote, and
  77. 3:00then we get an order. So this has been
  78. 3:02our basic fundamental this thing. We are
  79. 3:05very strong in you know in machining of
  80. 3:08these
  81. 3:09three type of machine machining.
  82. 3:12>> [snorts]
  83. 3:12>> Uh over the period of years we also
  84. 3:15started off with a built to spec. You
  85. 3:18know the customer gives us the
  86. 3:20specifications.
  87. 3:21So now we our engineering team gives a
  88. 3:25proposal that you know this can be made
  89. 3:27like this and this you know with these
  90. 3:28tolerances.
  91. 3:30Uh once we get the approval from the
  92. 3:32customer, we make a prototype. And the
  93. 3:35prototype we submit to them, we get it
  94. 3:38approved, and then you know we move that
  95. 3:41into the production.
  96. 3:43So a built to spec is the gestation
  97. 3:46period is slightly higher compared to
  98. 3:48the built to print. Built to spec is
  99. 3:51having higher
  100. 3:53margins and then as we move forward we
  101. 3:56want to do more of you know built to
  102. 3:59spec components rather than you know
  103. 4:02built to print. You know, built to print
  104. 4:04will be there but you know, built to
  105. 4:06spec will be [snorts] you know, our
  106. 4:08forte.
  107. 4:09Uh, so this is uh, the business models
  108. 4:13which we are presently having. And in
  109. 4:17this business model what has happened is
  110. 4:20uh, you know, post COVID we felt that
  111. 4:23you know, being in one vertical, you
  112. 4:25know,
  113. 4:26prior to or just after COVID we were
  114. 4:28predominantly working with the rail uh,
  115. 4:31business. So, uh, very little of
  116. 4:35aerospace and defense we used to do for
  117. 4:37the public sector of
  118. 4:39public sector companies in India. So, we
  119. 4:41felt that you know, we have to be in
  120. 4:43multiple areas even though geographical
  121. 4:45conditions uh, doesn't affect our
  122. 4:48business model. So, presently we work in
  123. 4:51four different verticals. And
  124. 4:54one of them is aerospace, second one is
  125. 4:57defense, the third one is rail and the
  126. 4:58fourth one is semiconductor machinery.
  127. 5:01So,
  128. 5:02uh, every opportunity in defense sectors
  129. 5:05whenever we received an RFP or an RFQ or
  130. 5:08in the tenders of government of India's
  131. 5:10listing we have
  132. 5:11gone ahead and taken initial
  133. 5:15risk, you know, in getting those
  134. 5:17inquiries and converted them into uh, a
  135. 5:20successful orders. So, in last one and
  136. 5:24one and half years we have gone into
  137. 5:26every aspect of the defense projects
  138. 5:29whether
  139. 5:30the new customers coming out from Israel
  140. 5:33or
  141. 5:34from France or the government of India's
  142. 5:38you know, many MOD's uh,
  143. 5:40uh,
  144. 5:41you know, RFPs. So, we got into most of
  145. 5:44the activities in
  146. 5:46you know,
  147. 5:47in the defense sector and we have been
  148. 5:50able to successfully convert this
  149. 5:54RFPs into orders and some of them we
  150. 5:56have started delivering them.
  151. 5:58>> So
  152. 5:59>> as we move forward our focus will be
  153. 6:01more on the defense sector and it will
  154. 6:04grow at a much faster rate as we
  155. 6:07progress.
  156. 6:08>> Okay.
  157. 6:09I think she told me nicely put out by
  158. 6:11you. I just wanted to understand one
  159. 6:13answer which you gave me semiconductor
  160. 6:15machinery. So can we
  161. 6:17take it as you make the entire machinery
  162. 6:20for semiconductor or some components
  163. 6:22which are required in the semiconductor
  164. 6:24machinery if you could clarify for us.
  165. 6:26>> There are
  166. 6:28many semiconductor machinery
  167. 6:30manufacturers and in in India as well as
  168. 6:33in Europe.
  169. 6:35At this moment we are doing only
  170. 6:36components for this machinery.
  171. 6:39We supply this components to the
  172. 6:41machinery manufacturers. So this are all
  173. 6:45special purpose machines or SPMs and
  174. 6:49they are not high volume. They are one
  175. 6:51off you know the quantity is as low as
  176. 6:53one and maximum of 10 numbers. So at
  177. 6:57this moment only
  178. 6:59components we are supplying.
  179. 7:02>> I just say that you know tell me one
  180. 7:04thing just from a very layman point of
  181. 7:05view that you know you manufacture
  182. 7:07components for aerospace defense railway
  183. 7:10semiconductor as you said. So what is
  184. 7:12the total SQ capacity like how many SQ
  185. 7:14might be we having and where do we
  186. 7:16source our raw materials because I
  187. 7:17believe we use raw materials like
  188. 7:19titanium you know which is very
  189. 7:20you know precious. So how is the supply
  190. 7:23logistic you know managed as far as the
  191. 7:25raw material sourcing is concerned if
  192. 7:27you could please tell us.
  193. 7:28>> Yeah
  194. 7:30one is that
  195. 7:32we are working predominantly right now
  196. 7:35you know more than 50% is in aluminum.
  197. 7:38When we get
  198. 7:39an RFP when we make the feasibility
  199. 7:41analysis, we inform the customer on
  200. 7:44availability and non availability. Now,
  201. 7:47in the rail sector and in some of the
  202. 7:50basic
  203. 7:51machine
  204. 7:52in the machinery,
  205. 7:54there are raw materials which is
  206. 7:56available in India. So, we tell the
  207. 7:59customer that, you know, this is an
  208. 8:01equivalent which is available in India.
  209. 8:03Can we go ahead? And we take it up
  210. 8:06post their confirmation. Now, when it
  211. 8:09comes to titanium and
  212. 8:11you know, Hastelloy or you know, special
  213. 8:14plastic material, you know, all these
  214. 8:16things, you know,
  215. 8:17the customer gives us
  216. 8:19the supplier's name. You know, like
  217. 8:22approved suppliers. You know, some of
  218. 8:24the Israel customers, they give us you
  219. 8:26need to buy from this suppliers only.
  220. 8:29So,
  221. 8:31here, you know, when it is defense and
  222. 8:33aerospace, availability of
  223. 8:35material right now with this war
  224. 8:37scenario is slightly difficult and uh
  225. 8:41>> [snorts]
  226. 8:41>> uh
  227. 8:42prices keep fluctuating, you know,
  228. 8:44compared to what it was 6 or 8 months
  229. 8:47back. So, we have you know, we have a
  230. 8:50good understanding with our customers.
  231. 8:52There are two ways. One is that, you
  232. 8:54know, if we are unable to
  233. 8:57you know, source these raw materials on
  234. 8:59time,
  235. 9:01we ask the customers to leverage their
  236. 9:04connects with the customers. So, for
  237. 9:06example, very recently, we have an order
  238. 9:08wherein which the customer told us the
  239. 9:11supplier told us it takes 8 months to
  240. 9:13deliver. So, we requested our Israeli
  241. 9:16customers, why don't you you know, talk
  242. 9:18to them and then, you know, they
  243. 9:20purchased the raw material and they
  244. 9:22shipped to us within within a month. So,
  245. 9:25it was easy for me to deliver the
  246. 9:27product, you know, much faster rate. So,
  247. 9:31we have to communicate with the
  248. 9:33customers on availability, then
  249. 9:37you know, the pricing and then uh
  250. 9:40you know either we can buy or you know
  251. 9:42we I request them to supply the raw
  252. 9:44material. So we have been managing this
  253. 9:47way
  254. 9:47and we'll continue to work in this way
  255. 9:49on the supply chain.
  256. 9:51>> Understood.
  257. 9:52So now Shiral ji just tell us something
  258. 9:55on the macro opportunity. We all know
  259. 9:57that defense and aerospace are the
  260. 9:58fastest growing sectors today
  261. 10:00considering that government of India
  262. 10:01wants to also promote the Make in India
  263. 10:03philosophy. So according to you next
  264. 10:06three to five years what is the kind of
  265. 10:08opportunity, you know, from the defense
  266. 10:10market which you have been very
  267. 10:11aggressive on? How fast and how big is
  268. 10:14the opportunity available for Milworks
  269. 10:16going forward? If you could just give us
  270. 10:17a bird's-eye view that would be helpful.
  271. 10:20>> Yeah. So
  272. 10:21as part of our strategic plan and you
  273. 10:24know how we are you know right now we
  274. 10:26are focused on the Israel market. So we
  275. 10:31based on our own
  276. 10:34you know communications and
  277. 10:36understanding with the 12 customers whom
  278. 10:38we work in Israel,
  279. 10:41we feel that
  280. 10:42you know the defense market in
  281. 10:46in Israel is growing and the RFPs which
  282. 10:50we are receiving is
  283. 10:52sufficient for our three to five years
  284. 10:54expansion plans and the growth plans. So
  285. 10:58Israel market has grown substantially.
  286. 11:01Then the second one is Make in India's
  287. 11:03aspect which you mentioned you know as
  288. 11:06part of our thing. The seven public
  289. 11:09sector companies
  290. 11:11which are which we have been working. So
  291. 11:13it is part of an indigenization project
  292. 11:16which we are working with these
  293. 11:18companies. So we are participating in
  294. 11:22this
  295. 11:23you know in this RFPs or RFQs with
  296. 11:26the government of India's
  297. 11:28and we will continue to you know grow in
  298. 11:31this sector also.
  299. 11:33So, if you see our strat plan,
  300. 11:36international customers, we we will
  301. 11:38continue to grow at a, you know,
  302. 11:4160% of our business will come from
  303. 11:43international and 40% will we will try
  304. 11:46to focus on our Indian opportunities.
  305. 11:50>> [snorts]
  306. 11:50>> Okay. Understood. Shridharji, now you
  307. 11:52mentioned about the Israel orders. I
  308. 11:54just wanted to understand that how this
  309. 11:56relationship got developed. Like, was it
  310. 11:58a normal RHP RFQ or basically, you know,
  311. 12:01you got some business contacts which
  312. 12:03helped you get business from Israel? How
  313. 12:05did the business journey from Israel
  314. 12:06start? And, you know, what kind of
  315. 12:08components are we making here? Are these
  316. 12:10built to spec or built to print? If you
  317. 12:12could give us give us an idea.
  318. 12:14>> Yeah, there are two
  319. 12:16both the,
  320. 12:17you know, built to print and built to
  321. 12:19spec we are working with the Israeli
  322. 12:22customers. One of the customer
  323. 12:24is very predominant in Israel, which is
  324. 12:27making
  325. 12:28who is refurbishing the engines for all
  326. 12:31the F-16 and F-35 planes. So, the NATO
  327. 12:35countries are sending all these planes
  328. 12:39to Tel Aviv to refurbish
  329. 12:42those engines. And, we are part of this,
  330. 12:46you know, component supplier. We supply
  331. 12:49specific components which goes into
  332. 12:52these engines. You know, as part of
  333. 12:56the spare, you know, requirement.
  334. 12:59So, this is a very niche area which we
  335. 13:01are working. This is again built to
  336. 13:05print. You know, the customer gives us a
  337. 13:08print. The volumes are very small,
  338. 13:11but high precision titanium
  339. 13:14stainless steel parts and a high level
  340. 13:16of accuracy is required. So, this is for
  341. 13:19the engine. The second customer which we
  342. 13:21are working, these are all the
  343. 13:22accessories used for holding the
  344. 13:25missiles on an aircraft or on a navy.
  345. 13:28So, these
  346. 13:30we are presently working with the
  347. 13:32Israeli customers. The relationship how
  348. 13:35we built is, you know,
  349. 13:37when the first RFP came, you know, we
  350. 13:39gave a quality and on-time
  351. 13:42Repeat orders kept coming in, you know,
  352. 13:44and then there's a relationship you
  353. 13:45build. So, it has taken 4 to 5 years to
  354. 13:48build this relation. Now, you know, from
  355. 13:50organic growth it's up to us how we take
  356. 13:54these projects and scale it
  357. 13:56up exponentially. So, we are taking this
  358. 13:58opportunity here to grow.
  359. 14:02>> And I think very nicely put out by you,
  360. 14:03Shridharji.
  361. 14:04Sir, and now tell me that typically, you
  362. 14:07know, when the order comes in,
  363. 14:08Shridharji, what's the kind of speed to
  364. 14:10market? Like you get an order from an
  365. 14:12Israeli customer, right?
  366. 14:13If it's a build-to-print kind of order,
  367. 14:15how much time does it take from getting
  368. 14:17the order to the execution and
  369. 14:19commissioning of that order? Roughly,
  370. 14:21what could be the timeline?
  371. 14:23>> So,
  372. 14:24when it is when we get an RFP, we are
  373. 14:28supposed to send a detailed quotation
  374. 14:31and
  375. 14:32execution plan within four working days
  376. 14:35of the RFP.
  377. 14:37So, many times the customer takes based
  378. 14:39on his their urgency, sometimes within
  379. 14:4210 days we get a purchase order or a
  380. 14:44negotiated
  381. 14:45price. Within 10 days we normally get
  382. 14:48it. When it is at the component level,
  383. 14:51the delivery times are somewhere between
  384. 14:5360 to 90 days based on the raw material
  385. 14:56availability. So, we are supposed to
  386. 14:58deliver the components within 90 days.
  387. 15:02The first article samples and then move
  388. 15:04into the production. When it is an
  389. 15:07assembly or a sub-assembly, these are
  390. 15:09all projects, you know, and then
  391. 15:12this takes a slightly higher time. The
  392. 15:15quotation itself it will take around 2
  393. 15:17weeks for us to submit where in which
  394. 15:20there are more than 100 components which
  395. 15:22comes as an assembly. And uh
  396. 15:25for us to deliver the first samples, it
  397. 15:27normally takes between 6 to 8 months.
  398. 15:30So, and then it is it moves once the
  399. 15:33prototypes are approved or the samples
  400. 15:35are approved, then it's only a matter of
  401. 15:37lead time and the staggered deliveries
  402. 15:39of the quantities which we agree upon
  403. 15:42during the final stages of negotiation.
  404. 15:46>> Okay. I just want to tell you one thing
  405. 15:48from a financial point of view, normally
  406. 15:50for your export orders, do you get any
  407. 15:52advance of 20 25% or is it entirely
  408. 15:54payable once the product is delivered to
  409. 15:56the customer?
  410. 15:58>> We had this issue prior to our
  411. 16:03you know, prior to February
  412. 16:06earlier this year before this war
  413. 16:07started. We normally used because of the
  414. 16:10relationship which we built over the
  415. 16:12period of years.
  416. 16:13We used to get 100% payment on 60 days
  417. 16:16credit
  418. 16:17once it is invoiced at our factory.
  419. 16:21Having seen this you know, difficulty
  420. 16:24for us on the working capital
  421. 16:25requirements, we changed this. We tried
  422. 16:28to inform you know, communicate to the
  423. 16:30customers that you know, because these
  424. 16:32are all large projects which we cannot
  425. 16:35handle without an advance payment. So,
  426. 16:38post February every order we are taking
  427. 16:4030% advance
  428. 16:42for the customers from all the 12
  429. 16:44customers in Israel or even in Europe.
  430. 16:47These customers have obliged and then
  431. 16:50they are giving us 30% advance and
  432. 16:54the remaining amount is normally 60 days
  433. 16:58from the date of invoicing from us.
  434. 17:01>> Okay.
  435. 17:02Sir, now one important question is that
  436. 17:05you know, typically you know, for our
  437. 17:07kind of products which are customized
  438. 17:09for the customer, are there any
  439. 17:11comparable peers you know, globally whom
  440. 17:13we compete or these are genuinely
  441. 17:15products which are designed completely
  442. 17:17as per the customer requirements and you
  443. 17:18are one of the few vendors. I just want
  444. 17:20to understand are there any comparable,
  445. 17:23you know, global companies or maybe
  446. 17:24Indian companies which are into the
  447. 17:26similar product lines?
  448. 17:28>> So, globally, you know,
  449. 17:31there are many peers and
  450. 17:34these Israeli customers, you know,
  451. 17:36they have been working specifically with
  452. 17:40uh
  453. 17:41other European suppliers.
  454. 17:43So, because of some of the geopolitical
  455. 17:47reasons,
  456. 17:49uh these customers have been moved most
  457. 17:51of them to Indian suppliers.
  458. 17:54And then when they start working with
  459. 17:56Indian suppliers on specific projects,
  460. 17:59they don't go
  461. 18:01they don't
  462. 18:02go with any other
  463. 18:05uh suppliers. So, if a project I'm
  464. 18:07working, so there is a contractual
  465. 18:10obligation. If this product they are
  466. 18:13working with us, they will go for with
  467. 18:15us for the next 5 years.
  468. 18:17So, we agree on a contractual
  469. 18:20obligation, a minimum for 5 years. It
  470. 18:22can be It can extend up to 15 years. So,
  471. 18:25this is the contractual obligations
  472. 18:26which we have right now.
  473. 18:28>> Okay, so one thing is very clear, the
  474. 18:30runway for growth is pretty large
  475. 18:32because the stickiness with the customer
  476. 18:34is for a large
  477. 18:36number of years. So, my thinking is
  478. 18:37right. So, it's going to be at least
  479. 18:39minimum 5 years and above. Sir, tell us
  480. 18:41one thing like now,
  481. 18:42you know, we have spoken so much about
  482. 18:44the product uh you know,
  483. 18:46skill set about our company. Sir, what
  484. 18:48is it that, you know, is our USP? Like,
  485. 18:50you know, you said there are global
  486. 18:52competitors, but if you know, business
  487. 18:54comes from Israel, business comes from
  488. 18:55the domestic market, what are the key
  489. 18:58qualitative aspects of the business
  490. 18:59which, you know, we have built because
  491. 19:01of your intrinsic kind of skill sets,
  492. 19:04your team skill sets? Two, three points
  493. 19:06which you can highlight that, you know,
  494. 19:07we are doing
  495. 19:08our job slightly better than what
  496. 19:10competitors and customers are liking our
  497. 19:12products, our execution, our service.
  498. 19:14So, if you could just add two, three
  499. 19:15points for us.
  500. 19:17>> Yeah. So, one is that we started moving
  501. 19:21from a component supplier to an assembly
  502. 19:24or a sub-assembly. So, one is that
  503. 19:26machine component, there is a sheet
  504. 19:28metal, then there is a bought out items
  505. 19:30like fasteners and other things. And
  506. 19:32then, you know, as a sub-assembly and an
  507. 19:35assembly, you know, we are making this
  508. 19:38USB, you know, the customer is coming
  509. 19:40back with a project rather than a
  510. 19:42component. So, we are very good in
  511. 19:45project execution. We work on a Gantt
  512. 19:49chart, you know, with a timely delivery
  513. 19:51of a component or a listing. When a
  514. 19:54project is assigned to us, we normally
  515. 19:57work on very clear project management
  516. 20:01schedule. And
  517. 20:03this is very important for us on
  518. 20:07you know, work with a very clear
  519. 20:11project management execution plan.
  520. 20:14Right [snorts]
  521. 20:14from the purchase of the raw material or
  522. 20:18to the delivery or giving a quality
  523. 20:20related one. So, this is one which we
  524. 20:23map very clearly and give the expected
  525. 20:26timelines for the delivery. The other
  526. 20:29thing is we have
  527. 20:31put in for every customer
  528. 20:33a POC or a point of contact. Every
  529. 20:36[snorts] communication right from
  530. 20:39technical
  531. 20:41review,
  532. 20:42product costing, quality. So, this
  533. 20:44person
  534. 20:46is the front face to the customer. So,
  535. 20:48internally he will work with the
  536. 20:50different teams in the operations or in
  537. 20:53quality or any
  538. 20:55you know, any things. So, he will work
  539. 20:57with them and
  540. 20:59you know,
  541. 21:00give the information to the customer.
  542. 21:02Also, the review mechanisms which we
  543. 21:04have, most of the customers will get an
  544. 21:06updated review every week
  545. 21:09on the status of the project. So, this
  546. 21:11is one thing, you know, the customer is
  547. 21:14you know, quite happy with the progress
  548. 21:16and you know, they intend to work with
  549. 21:19us in this way.
  550. 21:21>> Okay. I think nicely put out by you,
  551. 21:24sir.
  552. 21:24Now, let's talk about the financials. I
  553. 21:26think financials undoubtedly have been
  554. 21:28very strong. I think I was just seeing
  555. 21:30the latest RHP. Sir, top line of 148
  556. 21:33crores, bottom line of 57 crores. Sir,
  557. 21:36just tell us what exactly were the key
  558. 21:38drivers for this performance? Was it a
  559. 21:40volume and value push combination which
  560. 21:42helped you to improve your top line,
  561. 21:44your profitability and of course your
  562. 21:47you know, absolute profit number. Sir,
  563. 21:49one or two reasons why this significant
  564. 21:51jump has happened in the last 12 months.
  565. 21:53Could you please tell us?
  566. 21:55>> Yeah, Avinash ji, what happened over the
  567. 21:57period of time, you know, there were
  568. 21:59exact there there were a lot of
  569. 22:01opportunities, you know, which we
  570. 22:03received
  571. 22:05either from the Israel customers or from
  572. 22:08our own QuickPay company which is
  573. 22:10manufacturing of drones. There are
  574. 22:13significant amount of skill set which
  575. 22:15Milworks has and
  576. 22:18you know, QuickPay has separately their
  577. 22:21own skill sets. Like you know, we have
  578. 22:23we work on our 3D printers, machining, a
  579. 22:27very small integration of boards, you
  580. 22:29know, like battery management systems
  581. 22:31and all we have that skill set at
  582. 22:33Milworks. So, what we did is we
  583. 22:36we took a calculated risk. Let's do it
  584. 22:39together, you know,
  585. 22:40to deliver a product which is a
  586. 22:42world-class facility, a loitering
  587. 22:45munition drone in a you know, working
  588. 22:47for QuickPay. So, this added you know,
  589. 22:51to the top line as well as bottom line.
  590. 22:53So, we helped QuickPay to take up this
  591. 22:58project, you know, right from
  592. 23:01advanced bank guarantee or you know any
  593. 23:04any of those financial requirements and
  594. 23:06then
  595. 23:07we handheld during the you know
  596. 23:11development of this product you know in
  597. 23:13last 8 months and this was a successful
  598. 23:17effort by both of us together to deliver
  599. 23:20a loitering munition drone. So to answer
  600. 23:22your question you know you know
  601. 23:25we did take a lot of risk and
  602. 23:29any opportunities it came you know in
  603. 23:31last one year we took it as a challenge
  604. 23:35and try to deliver that in time and the
  605. 23:38numbers just followed behind us. So this
  606. 23:41is the same way we are going to work any
  607. 23:43opportunities which comes we evaluate
  608. 23:45clearly whether it is part of our own
  609. 23:48forte or whether it is you know we take
  610. 23:51a calculated risk and then move forward.
  611. 23:53Sometimes most of the times you know
  612. 23:55when we take risk you know it really
  613. 23:57works out very well. So that's how the
  614. 23:59numbers are much better to our previous
  615. 24:02years in this
  616. 24:03you know what you have seen in the RHP.
  617. 24:07>> Okay. Sir now one question I wanted to
  618. 24:09ask you which got left out earlier. Sir
  619. 24:11I believe you know you all are doing a
  620. 24:13saddle project specifically for F-16.
  621. 24:16Just if you could briefly tell us you
  622. 24:17know what is the scope of activity for
  623. 24:19us there and secondly sir this quick pay
  624. 24:21drone company you know which you
  625. 24:23mentioned that you know you are in the
  626. 24:25process of also helping them you know
  627. 24:27manufacture those loitering drones.
  628. 24:30Is this company quick pay drone already
  629. 24:32empaneled by the defense ministry to get
  630. 24:34this order? I mean just wanted to
  631. 24:36understand this very clearly because not
  632. 24:38much information is known about this
  633. 24:39company.
  634. 24:40>> So I will first talk about the quick
  635. 24:43pay.
  636. 24:44Quick pay drones has been in
  637. 24:46in this drone development way back in
  638. 24:502019
  639. 24:52when they changed their own
  640. 24:55product line
  641. 24:57to drones. So now uh uh, it took many
  642. 25:01years for them to develop a loitering
  643. 25:03munition drone, uh, get it approved from
  644. 25:06MOD. It took, you know, they have built
  645. 25:08more than 40 drones themselves.
  646. 25:11Took trials at, uh, the northern sector
  647. 25:13and eastern sector, and then approved,
  648. 25:17you know, they they proved it that, you
  649. 25:19know, they really can make a good
  650. 25:21loitering munition drone.
  651. 25:23So, based on all these trials, they have
  652. 25:26been approved by MOD, uh, the artillery
  653. 25:29and the northern division. And, uh,
  654. 25:32after these approvals, their factory,
  655. 25:35which is based out of Noida, this is
  656. 25:37also, uh, defense license is, uh, you
  657. 25:40know, is given to them for to
  658. 25:42manufacture the, uh, loitering munition
  659. 25:44drones. And, uh, also,
  660. 25:48uh, the skill set which they have, they
  661. 25:49have slightly more than 60 employees.
  662. 25:52Uh, amazing people,
  663. 25:55uh, which they have, uh, in the, uh, in
  664. 25:57the company, you know, where they design
  665. 26:00the firmware and, you know, all the
  666. 26:02electronic boards, you know,
  667. 26:04you know, they have complete set of, uh,
  668. 26:07the skill set to build the uh, entire
  669. 26:10drones. So, uh, you know, we made our
  670. 26:14own due diligence well before we
  671. 26:16invested, and then, you know, it cost
  672. 26:18some time, and, uh, then we decided, uh,
  673. 26:21then we decided to, you know, take up
  674. 26:24the projects along with them. And, what
  675. 26:27happens is when you hold hands together,
  676. 26:29it give you you can normally give a
  677. 26:31really good product. So, we complement
  678. 26:34each other. They're they're very good in
  679. 26:36software development, and, you know,
  680. 26:39uh, electronic integration, and front
  681. 26:41ending in the MOD, you know,
  682. 26:43Ministry of Defense. So, we are good at
  683. 26:45the back end, you know, so, it really
  684. 26:48helped us during our, uh, uh, know,
  685. 26:50journey.
  686. 26:52Now, coming back to the uh, your first
  687. 26:54question on the saddle project. So, the
  688. 26:57saddle project is uh,
  689. 26:59it is it's like a fixture.
  690. 27:02Uh, it goes into an aircraft, you know,
  691. 27:05where it holds the missile systems. It
  692. 27:08is basically called as a carrier, you
  693. 27:11know, a c a r r i e r, you know, to hold
  694. 27:14a missile.
  695. 27:16Uh, it gets released, you know, when a
  696. 27:18missile is released, this saddle also
  697. 27:20get released.
  698. 27:22So, there's a high volume requirement of
  699. 27:24this
  700. 27:25uh,
  701. 27:26saddle or what they call this
  702. 27:28carrier for the
  703. 27:30um,
  704. 27:32missile systems. So, we have been
  705. 27:34entrusted on the development of this
  706. 27:36project. And
  707. 27:38at this moment, we have completed all
  708. 27:40our design and
  709. 27:42prototyping of all these
  710. 27:45projects. And this is under the approval
  711. 27:48stage right now. So, once this is
  712. 27:51approved, this is going to be a really
  713. 27:54good
  714. 27:55uh, a project for Milworks to move
  715. 27:57forward. Um, this project has machine
  716. 28:00component. There's a sheet metal
  717. 28:03component. Um, there is a riveting,
  718. 28:05welding, you know, integrating the
  719. 28:07complete assembly, and then testing it,
  720. 28:11you know, with a a prototype which we
  721. 28:13have prototype of a missile. And then
  722. 28:17validating for the you know, for the
  723. 28:20quality of the system. So,
  724. 28:22this is a very important project and
  725. 28:25we are seriously working with a strong
  726. 28:27dedicated team put on this. Uh, there
  727. 28:30are critical requirements in terms of
  728. 28:32raw material sourcing as well as the
  729. 28:35requirement on the quality side on in
  730. 28:37dimensions
  731. 28:38um, for this project.
  732. 28:41>> Okay. So, now just wanted to understand
  733. 28:44that in our business, is there any
  734. 28:46concept like L1 orders or confirmed
  735. 28:48orders? You know, because typically the
  736. 28:50way you are speaking, we would not like
  737. 28:52to get the number from you, but
  738. 28:53typically, you know, how do you plan
  739. 28:55your production? Like typically, do you
  740. 28:57have customers who give you repeat
  741. 28:59business? Or typically, you know their
  742. 29:00projects, you know their schedules, and
  743. 29:02accordingly, production is synchronized.
  744. 29:04So, if you could tell us something on
  745. 29:06this.
  746. 29:07>> Uh
  747. 29:08All my international customers, we work
  748. 29:12it's a very
  749. 29:14it's it's normally
  750. 29:16it's a contractual project management
  751. 29:18tool wherein which
  752. 29:20once the prototype is approved or the
  753. 29:23products are approved,
  754. 29:25this goes on a schedule basis for, you
  755. 29:27know, every month, you know, so much
  756. 29:29quantity is required over the period of
  757. 29:315 years.
  758. 29:33Uh sometimes
  759. 29:34the purchase orders are released you
  760. 29:36know, on a monthly basis on a bigger
  761. 29:39contractual arrangement, you know, like
  762. 29:42they require 2,500 pieces per annum, and
  763. 29:46you're supposed to ship them 250 per per
  764. 29:50month. So, 250 per month can become 280
  765. 29:53or 220, you know, those quantity can
  766. 29:56vary, but you know, the annual volumes
  767. 29:57are fixed. And then this
  768. 30:00uh is based on a schedule. So, this is
  769. 30:02one way of working. All my international
  770. 30:04customers, we don't work on L1 basis. We
  771. 30:08work on the
  772. 30:09uh
  773. 30:10you know, a quotation which we give and
  774. 30:12the quality which we give, the service,
  775. 30:14and on-time delivery. So, we work with
  776. 30:16in this way.
  777. 30:18But we are working with the seven
  778. 30:20divisions of the public sector
  779. 30:21undertaking in India, some large
  780. 30:23projects which we are now become L1, and
  781. 30:26this will get converted into an order
  782. 30:28over the period of time, next 2-3
  783. 30:30months. Uh in the drone sector and all
  784. 30:33the Ministry of Defense projects which
  785. 30:36we are working either in BrahMos or in
  786. 30:38most of them work on the L1
  787. 30:41aspect. So, sometimes it is a pain. Uh
  788. 30:45if you ask me a hit rate a hit rate of
  789. 30:48uh uh the L1, we lose 90% of
  790. 30:52uh the orders. We won't get it because
  791. 30:54either we are expensive or, you know,
  792. 30:57feasibility. So, only 10% is our hit
  793. 31:00rate, but we are happy in executing
  794. 31:03those 10 uh 10%.
  795. 31:05And uh we will continue to be in this
  796. 31:07segment, also.
  797. 31:09>> Okay.
  798. 31:10Okay, fine. So, now uh let's come to the
  799. 31:12most important question. Uh sir, we are
  800. 31:14going public, so it's a big credible
  801. 31:16achievement to you and your team. Sir,
  802. 31:18tell us uh sir, what is the size of the
  803. 31:21capital market offer? How much capital
  804. 31:23are we raising from the market? And what
  805. 31:24is the broad objective of using this
  806. 31:26money?
  807. 31:27>> Uh we are raising around 160 crore from
  808. 31:31the market. Uh mainly the objective of
  809. 31:34this uh out of this 60 crore, we are
  810. 31:37trying to uh spend uh it mainly for our
  811. 31:42capex. So, we intend to put up a
  812. 31:45world-class facility uh with best
  813. 31:48machines uh
  814. 31:49uh from India and abroad. Uh you know,
  815. 31:52presently we are lacking a controlled
  816. 31:55atmosphere facility.
  817. 31:57So, to give a high-end product in
  818. 31:59aerospace and defense, we require a
  819. 32:02class 10,000 or a air-conditioned
  820. 32:04factory, which we do not have. So, we
  821. 32:07are going to put up in next 6 months a
  822. 32:09world-class facility on
  823. 32:12uh you know, a controlled atmosphere
  824. 32:15this thing. We are also adding 31 new
  825. 32:18CNC machines from India and abroad.
  826. 32:21So, in the next 6 to uh 8 months. So, we
  827. 32:24are going to increase our capability and
  828. 32:27capacity.
  829. 32:28So, we are going to spend a lot of money
  830. 32:31on on the uh world-class facility. Now,
  831. 32:36the remaining
  832. 32:37uh amount, which is
  833. 32:39uh we are using it for our working
  834. 32:40capital purpose because as we have been
  835. 32:43working a lot with
  836. 32:45the government of India's a public
  837. 32:47sector projects, we require a lot of
  838. 32:49money for the working capital
  839. 32:52requirement. So, we continue to you to
  840. 32:55use this
  841. 32:56funds for our working capital
  842. 32:58requirement.
  843. 33:00>> Okay. Sir, just wanted to understand
  844. 33:02this CAPEX which you mentioned. This is
  845. 33:04going to come at the existing facility
  846. 33:06itself.
  847. 33:07>> Uh we have one facility unit four. The
  848. 33:11unit four is having additional 20,000 sq
  849. 33:15ft space available right now. So, as
  850. 33:17part of our
  851. 33:19expansion plans, these all these
  852. 33:20machines will come into the unit four
  853. 33:22facility and
  854. 33:25you know, for it will be utilized in
  855. 33:27next 6 to 8 months, this facility will
  856. 33:29have uh most of the machines.
  857. 33:31>> Okay.
  858. 33:32So, hopefully
  859. 33:34sir, I think probably 27,
  860. 33:3628 could be a year where you could see
  861. 33:39complete execution from these machines,
  862. 33:41right?
  863. 33:42>> Right. Correct, sir. So, 27 January
  864. 33:45onwards, you will be seeing all the
  865. 33:47uh all the machines getting
  866. 33:50you know, running in full
  867. 33:52>> Okay.
  868. 33:53>> full capacity.
  869. 33:55>> Sir, now the most important question
  870. 33:57which is very important you know, which
  871. 33:59a lot of analysts and you know, myself
  872. 34:01would also look to know. We have been
  873. 34:02doing very well on the top line, on the
  874. 34:04profitability, on the margin sir, but as
  875. 34:07you all aware, you know, defense is a
  876. 34:09very you know, long payable business.
  877. 34:11So, you know, our cash flows have not
  878. 34:12been positive. Sir, I just want to
  879. 34:15understand now since you're going to get
  880. 34:16a lot of money from working capital, you
  881. 34:18know, from the public issue. Can we
  882. 34:19expect that this high dependence of you
  883. 34:22know,
  884. 34:23cash flows not getting impacted
  885. 34:25positively because of slow payments
  886. 34:27because money will surely come. I'm sure
  887. 34:29your defense customers will pay you, but
  888. 34:31obviously with a elongated period, but
  889. 34:32can this period be shortened going
  890. 34:34forward in the next say a couple of
  891. 34:35years?
  892. 34:36>> So, see this is why we know we want to
  893. 34:39you know balance between our
  894. 34:41international and the local
  895. 34:44customers. So, you know as I mentioned
  896. 34:47to you earlier, so we this advanced
  897. 34:49payments with all my international
  898. 34:51customers will add into my you know the
  899. 34:54problems which I'm having on the
  900. 34:57you know cash flows. Till 1 30% of that
  901. 35:00problem is solved. But, the bigger
  902. 35:02problem which I have on the L1 business
  903. 35:05either in the drone business, this is a
  904. 35:07policy which the government of India is
  905. 35:10is doing, but it is a problem for every
  906. 35:13you know
  907. 35:14every MSME or a growing company that you
  908. 35:17have to pay 10% of the you know
  909. 35:20bank guarantee and you get paid only
  910. 35:22after the delivery. So, we have to live
  911. 35:25with that policy and then you know this
  912. 35:28this is something you know it is very
  913. 35:31difficult for me to handle. So, the
  914. 35:33project managements when I'm working on
  915. 35:36the L1 this thing we have to live with
  916. 35:38that this thing and balance. So, this is
  917. 35:40why you know we are trying to do 70 30
  918. 35:44you know try to business get more
  919. 35:46projects from international customers
  920. 35:47where you get advanced payments.
  921. 35:50I will not get any advanced payments
  922. 35:53from any of the MOD or the public sector
  923. 35:56orders. So, I have to live with this
  924. 35:58scenario.
  925. 36:00>> All right. I think understood very well
  926. 36:01sir. Sir, last question now
  927. 36:04we are in a very high growth you know
  928. 36:06serving industry like defense,
  929. 36:07aerospace, railways. Sir, tell us you
  930. 36:10know now what is the challenge for you?
  931. 36:12Like is it exhibition or is it basically
  932. 36:15maintaining your quality standard for
  933. 36:16your products? What could be the key
  934. 36:18risk in our business according to you?
  935. 36:20>> According to me there there are you know
  936. 36:23three to four a important risk which
  937. 36:26presently I'm going through. One is
  938. 36:28that, you know, Bangalore being such a
  939. 36:31cosmopolitan
  940. 36:32area, hiring a really good talented
  941. 36:36person right there in engineering or
  942. 36:39in the quality or in operations or
  943. 36:42programmers for all my CNC machines is a
  944. 36:44big challenge. So, uh
  945. 36:47you know, I think
  946. 36:49you know, post our IPO our
  947. 36:52you know, this challenge may get
  948. 36:54mitigated.
  949. 36:55Uh
  950. 36:56you know, with the name Milworks getting
  951. 36:58in into the market. So,
  952. 37:01uh people will be willing to work with
  953. 37:03us. You know, you know, this is one, you
  954. 37:06know, the people's management is going
  955. 37:08to be a you know, uh a bigger risk.
  956. 37:11Second thing is uh
  957. 37:12uh
  958. 37:14you know, the execution challenges which
  959. 37:16we you know, which we have is the raw
  960. 37:19material availability over the period of
  961. 37:21time. You know, so the gestation period
  962. 37:24of this raw material is very high in
  963. 37:26some of the areas. So, the project gets
  964. 37:28postponed or moved. Uh
  965. 37:31you know, towards you know, whether it
  966. 37:33when it has to be in months, it will go
  967. 37:35you know, you know, from 1 or 2 months
  968. 37:37to 4 to 4 to 5 months. So, that is going
  969. 37:40to be also be a challenge on the supply
  970. 37:42chain aspect. But otherwise, you know,
  971. 37:45uh a quality of the product or the
  972. 37:48on-time delivery of any of those
  973. 37:50projects is not a challenge, not a risk.
  974. 37:52We are good at it in executing that on
  975. 37:54time and giving a quality required by
  976. 37:58the customer. So,
  977. 38:00uh
  978. 38:01you know, this the two risks which we
  979. 38:03right now foresee is on the you know,
  980. 38:06skilled labor and the second thing is on
  981. 38:10the supply chain of the raw material.
  982. 38:13>> And I think it was my pleasure
  983. 38:15Shridharji to talk to you and I think
  984. 38:16please accept my best wishes to you,
  985. 38:18your entire management team and sir,
  986. 38:20wishes for your
  987. 38:21public issue also. Thank you very much.
  988. 38:22>> Thank you, sir. Thank you very much,
  989. 38:24sir. Thank you very much for your time.
  990. 38:25>> Thank you.
  991. 38:27>> Yeah. Thank you, sir.
  992. 38:29>> Yeah.
  993. 38:31>> [music]

About this transcript

This page contains the full transcript of Millworks Technologies Ltd.: Precision Engineering for Aerospace, Defence, Railways & Semiconductor by Konexio Network, generated from the public captions YouTube serves with the video. The transcript has 6,089 words across 993 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.