  1. 0:05Good morning everyone. Myself Shikha
  2. 0:07Panda on behalf of Kin Advisors. It's a
  3. 0:10pleasure to welcome you all to investor
  4. 0:12conclave investor connect summit 2026
  5. 0:15powered by a mentors and co-powered by
  6. 0:18Kin Advisers. Today marks the second day
  7. 0:21of our two-day summit featuring a
  8. 0:23powerful lineup of focused management
  9. 0:26meetings to conclude the journey on a
  10. 0:28high note. This is the first interaction
  11. 0:30of the day with me works technologies
  12. 0:32limited. From the management team, we
  13. 0:35have with us Mr. Shridar Achara sir,
  14. 0:37managing director and promoter of the
  15. 0:39company. Good morning and welcome, sir.
  16. 0:41>> Good morning.
  17. 0:43>> We have with us Mr. HK Madu, promoter
  18. 0:46and team director of the company. Good
  19. 0:48morning and welcome sir.
  20. 0:50>> Good morning.
  21. 0:53>> We have with us from Ainto team. We have
  22. 0:56with us Mr. Avin sir. Good morning and
  23. 0:58welcome sir.
  24. 1:00>> Yeah, good morning. Uh
  25. 1:02>> with that I hand over the floor to sir.
  26. 1:05Over to you sir.
  27. 1:07>> Yeah. So good morning everybody and
  28. 1:09welcome to the virtual investor uh you
  29. 1:12know conclave. Uh Mr. Shedder, Mr. Madu,
  30. 1:14it's a pleasure for me to talk to you. I
  31. 1:16think we are eagerly awaiting your
  32. 1:17public issue. Uh very interesting
  33. 1:20company. So you know just to tell uh the
  34. 1:22viewers who are uh listening to this
  35. 1:24call and seeing it uh Milworks is
  36. 1:26basically a Bangalore based company into
  37. 1:28precision engineering components. I
  38. 1:30think more details will be shared by Mr.
  39. 1:33Shrar and Mr. Madu. So without wasting
  40. 1:35time I would give the you know charge to
  41. 1:37both of them. Sir please start with
  42. 1:39giving a brief profile about your
  43. 1:41company and what are the applications
  44. 1:43how did you all start this you know
  45. 1:44company the something on the business
  46. 1:46journey if you could tell us and then
  47. 1:48you all can start. Thank you. Thank you
  48. 1:50Ainar G. Uh thank you Gian Advisers. Uh
  49. 1:53let me start off uh you know uh our
  50. 1:57growth journey story. uh myself uh and
  51. 2:01Madu we met together uh way back in 2015
  52. 2:05uh in Chennai and uh from there uh we
  53. 2:09were working in corporate companies and
  54. 2:11uh this is the time when we thought that
  55. 2:12we will move into an entrepreneurial
  56. 2:14journey and uh CNC machining and uh
  57. 2:18sheet metal uh component was uh uh one
  58. 2:22of our uh you know uh very much interest
  59. 2:25and we had carried uh those experience
  60. 2:28all our life we start we thought that we
  61. 2:30will uh get into the entrepreneur
  62. 2:32journey. This is the time when we uh you
  63. 2:36know from Chennai to Bangalore we
  64. 2:38relocated and uh invested in a small
  65. 2:41company called V3 technologies. This was
  66. 2:44a uh a partnership company and uh for
  67. 2:48more than 6 years uh we grew the company
  68. 2:51organically year on year from five
  69. 2:54machines, seven machines and up till 18
  70. 2:56machines we kept on adding uh uh
  71. 3:00organically. So this was a time in just
  72. 3:03before covid we thought that uh this is
  73. 3:05the time that we grow exponentially when
  74. 3:08the same customers asking us you know to
  75. 3:11grow big. So this is the time when uh we
  76. 3:15decided let's make it a private limited
  77. 3:18company. So V3 has been a very common uh
  78. 3:21name and uh the ROC was difficult to get
  79. 3:25us the name. So we coined this new name
  80. 3:27called Milworks Technologies Limited and
  81. 3:30uh we moved all the assets and customer
  82. 3:32base everything from V3 to Milworks. So
  83. 3:362021 November onwards uh we are now
  84. 3:39called as Milworks Technologies Limited.
  85. 3:42So initially we had only one unit with
  86. 3:45around uh 15 to 16 machines in 2021.
  87. 3:49Uh but COVID year has been uh you know a
  88. 3:52really good year for us. We doubled our
  89. 3:55top line and also the margins
  90. 3:58uh you know and uh from 2021 you know we
  91. 4:01have been growing at a much faster rate.
  92. 4:04So in uh presently we have four units uh
  93. 4:08all the four units are based out of
  94. 4:10Bangalore uh with more than 75 CNC
  95. 4:13machines and uh giving you know working
  96. 4:17for uh more than uh uh 40 customers
  97. 4:21worldwide. We've been exporting uh uh
  98. 4:25defense components, rail components and
  99. 4:28um aerospace components to around uh 16
  100. 4:32countries. uh in Europe and uh in the
  101. 4:36US. So uh our business model has been
  102. 4:40into a build to print and uh build to
  103. 4:43spec. Build to print is nothing but the
  104. 4:46customer gives us uh a very clear u u uh
  105. 4:523D drawing and a 3D model of a component
  106. 4:56and uh we may we manufacture the
  107. 4:58components as per the print. Build to
  108. 5:02spec is uh something the customer gives
  109. 5:05us uh uh a concept and then uh we design
  110. 5:10uh the component as per the application
  111. 5:12and uh then it moves to a prototype and
  112. 5:15then uh this moves uh into the
  113. 5:18manufacturing. So from the prototype to
  114. 5:21the manufacturing uh normally uh the
  115. 5:24lead times are much higher. So if you
  116. 5:27see
  117. 5:28uh build to spec and uh build to
  118. 5:32uh print you know there's a more uh you
  119. 5:35know enormous difference of uh the way
  120. 5:38we manufacture. So build to spec uh the
  121. 5:41lead times normally it takes between 6
  122. 5:44to 8 months and those are all the
  123. 5:45projects you know where the CNC
  124. 5:47machineing sheet metal bought out items
  125. 5:49we assemble them test them and give them
  126. 5:52to the customer. So normally built to
  127. 5:55specs are growing at a much uh you know
  128. 5:58higher weight. All the defense products
  129. 6:00which we are now working they're all
  130. 6:03built to spec projects and uh the rail
  131. 6:06components whatever we are making they
  132. 6:08are all uh uh they are all built to
  133. 6:11print uh models. Uh in last uh couple of
  134. 6:16years we got opportunities for uh
  135. 6:18smalltime uh acquisitions.
  136. 6:21uh we made a small acquisition uh in a
  137. 6:24aerospace uh company called Vidwan
  138. 6:27Aeronautics. We initiated this
  139. 6:29acquisition. Uh this is into uh arrow
  140. 6:33and aerero tooling component
  141. 6:35manufacturing based out of Bangalore. Uh
  142. 6:39then we also made a small investment in
  143. 6:42a spring manufacturing unit called
  144. 6:45Hindustan Springs. Uh the springs was uh
  145. 6:48uh based out of this company was based
  146. 6:51out of Mysore and uh this spring was
  147. 6:54purely into automotive but now we moved
  148. 6:57this automotive springs to uh recoil
  149. 7:01springs in the defense industry.
  150. 7:03Presently we are making trials for the
  151. 7:05defense industry.
  152. 7:07>> [clears throat]
  153. 7:07>> uh last year uh June and July we also
  154. 7:10got an um you know uh opportunity to
  155. 7:14invest in a drone company based out of
  156. 7:18uh NOA called Quickpay drones. So we
  157. 7:21made a small investment in this uh
  158. 7:24company. Presently they are executing a
  159. 7:26large order for uh 1,950
  160. 7:30drones a loitering minion drones and
  161. 7:33Milw is helping them uh you know build
  162. 7:36those drones with our own capability and
  163. 7:40uh this uh is uh ready for delivery in
  164. 7:43another uh 10 days to the ministry of
  165. 7:46defense.
  166. 7:48So uh from a component manufacturer to
  167. 7:52uh you know to an assembly this has been
  168. 7:55a growth journey and uh we have been
  169. 7:58working with uh defense industries. So I
  170. 8:01will ask Madus to talk a little bit
  171. 8:04about uh you know our journey with HL
  172. 8:07and the defense industries now how we
  173. 8:09are working uh thing. Madus why don't we
  174. 8:11talk about uh the HL?
  175. 8:15Yeah, well said. Like we have started
  176. 8:17with the small part manufacturing for
  177. 8:20the uh customers requirement especially
  178. 8:24for HL and some of the other customers
  179. 8:26including Bramhos and Islu
  180. 8:30customer used to give us the drawing and
  181. 8:33prints we used to manufacture based upon
  182. 8:35the prints. Uh now with Atmanar Bharat
  183. 8:40indigenization project we started
  184. 8:42getting into projects. So we have
  185. 8:44already won more than uh uh six uh
  186. 8:49tenders. So from the uh these projects
  187. 8:51these are all high value projects. So
  188. 8:54which we are in the race apart from like
  189. 8:57uh there is a big large tender this is
  190. 9:00on the fused lag. Uh so that we are in
  191. 9:04the almost in the final stage. This is
  192. 9:07for uh the wing substructure which is
  193. 9:10completely has to be manufactured. So
  194. 9:13the concept here is like uh HL provides
  195. 9:16us the composite
  196. 9:18material parts and uh the complete wing
  197. 9:22has to be uh the wing parts has to be
  198. 9:25manufactured in the Bangalore because of
  199. 9:27the logistics uh restrictions they just
  200. 9:30avoided other uh uh suppliers from other
  201. 9:34regions. So, so hence we have a lot of
  202. 9:38opportunity in this segment especially
  203. 9:40on the wing substructure uh complete
  204. 9:43manufacturing assembly and delivery uh
  205. 9:46to the HL. So that is one of the large
  206. 9:49uh part which we are working and apart
  207. 9:51from for many companies we already
  208. 9:55started manufacturing the parts for
  209. 9:58missile systems and missile launchers.
  210. 10:01So this is including Lbit system and uh
  211. 10:04II these are all in the pipeline
  212. 10:06already. We do have the PO. So the
  213. 10:09development activities are going on at
  214. 10:12our facility.
  215. 10:16So uh thank you Majasir for uh you know
  216. 10:19updating on this thing. Presently we uh
  217. 10:22presently we are working with seven
  218. 10:24divisions of HL which includes uh uh
  219. 10:27NASC engine division in Bangalore uh a
  220. 10:31DC helicopter uh Lucknau uh and KPUR.
  221. 10:35All these divisions uh we have been
  222. 10:37working at the component level but very
  223. 10:39recently we have been uh selected for
  224. 10:42the assemblies s subasssemblies
  225. 10:45uh and we have been winning uh smalltime
  226. 10:48uh tenders in uh these units. So uh what
  227. 10:52we see uh this tremendous growth which
  228. 10:55is happening in the defense sector and
  229. 10:57Milworks uh wants to be part of uh uh
  230. 11:02this growth journey in uh the Indian
  231. 11:04defense sector as well as uh Israel
  232. 11:07being our uh um close partners uh you
  233. 11:11know we have been working with them for
  234. 11:13some years now. So we have been uh
  235. 11:16working very closely on larger projects
  236. 11:18uh from uh Israel. So apart from these
  237. 11:22uh in the aerospace uh industry we work
  238. 11:26uh presently with Vipro aerospace uh and
  239. 11:30then couple of more companies uh in
  240. 11:32India where in which we are tire two for
  241. 11:35Boeing and Airbus. So we are presently
  242. 11:38not at 1 for uh Boeing and Airbus
  243. 11:41because uh we are presently not
  244. 11:44qualified in terms of uh revenue numbers
  245. 11:47as well as infrastructure for these uh
  246. 11:50two companies. uh our intention uh in
  247. 11:54next 3 years to become uh uh a tire one
  248. 11:59supplier for Airbus and uh to get
  249. 12:01qualified for Boeing uh once we have the
  250. 12:04infrastructure and uh
  251. 12:08uh infrastructure and uh the capability
  252. 12:11uh to build the aeros components. So
  253. 12:16this is a small brief about Milworks
  254. 12:19technologies. So uh I think uh I will
  255. 12:22open up for more questions rather than
  256. 12:25you know you know you know keep talking.
  257. 12:32>> Thank you so much sir for giving the
  258. 12:34brief introduction of the company and
  259. 12:36thank you Madusa. So we'll start the Q&A
  260. 12:39session now. So participants you can
  261. 12:42drop your question in the question box
  262. 12:44or also you can raise your hand for any
  263. 12:46questions. So sir I think we have a
  264. 12:48questions from Disha ma'am. So Disha
  265. 12:51ma'am we can go ahead with your
  266. 12:53question.
  267. 12:56Hello. [clears throat]
  268. 12:57Hello audible sir.
  269. 12:58>> Yeah.
  270. 12:59>> Yes you have audible ma'am.
  271. 13:01>> Yes. Thank you so much sir for this
  272. 13:03opportunity and thank you for the
  273. 13:04introduction sir. Couple of questions
  274. 13:06sir. Firstly on our current order book.
  275. 13:08So you mentioned there's a lot of
  276. 13:09traction that we see in both the
  277. 13:10aerospace and the defense segment. Could
  278. 13:12you help me with what is the current
  279. 13:13order book right now?
  280. 13:15Uh presently we have uh 145 crores of
  281. 13:18order book and uh in 145 crores uh 110
  282. 13:23is in the aerospace and uh defense and
  283. 13:27uh the rail components uh where we work
  284. 13:30very closely with also seammens and vap
  285. 13:33uh that is to the tune of around 35
  286. 13:36crores. So 145 is the present order
  287. 13:39book. But then what happens is uh uh we
  288. 13:42have not counted in this 145 the
  289. 13:44schedules. The schedule is something but
  290. 13:47uh where the customer uh keeps uh gives
  291. 13:50us a schedule where in which the orders
  292. 13:52are for the entire year and we are
  293. 13:54supposed to deliver them every month you
  294. 13:56know this uh this is in the rail sector
  295. 13:58and uh some of the defense sectors. So
  296. 14:02uh schedules are not counted. So 145
  297. 14:04crores is uh the order book which we
  298. 14:07have which we are supposed to deliver in
  299. 14:10next 6 months.
  300. 14:16>> Okay. Okay. And what sort of pipeline
  301. 14:18are we looking at? What sort of orders
  302. 14:20are currently in the advanced stage? Any
  303. 14:22sort of light on that?
  304. 14:23>> So so uh out of uh you know we are
  305. 14:26presently working on uh some of the
  306. 14:29Israel projects. We are working on uh
  307. 14:31one large uh saddle project with Elbit
  308. 14:35systems where we are expecting an uh
  309. 14:38order of 200 plus cres uh where in which
  310. 14:42partially it'll be executed before uh
  311. 14:45March uh 2027 and the remaining will
  312. 14:49percolate to next year. This is one
  313. 14:51project from Elvit Systems. uh we have a
  314. 14:54trial order and presently uh the trial
  315. 14:56order is uh being executed in our
  316. 14:59factory. Uh this is uh for the only one
  317. 15:02order. Then we are as Madusar also
  318. 15:04mentioned we are working on a hus large
  319. 15:07uh systems for HL where that is uh uh
  320. 15:11the project is worth around uh 71 crores
  321. 15:14and uh we have become L1 and then uh any
  322. 15:17moment we are likely to get the prior
  323. 15:20order which has to be executed in this
  324. 15:23current year.
  325. 15:25>> So what sort of
  326. 15:26>> yeah please go ahead. What sort of
  327. 15:28growth sir do we look like for this
  328. 15:30year? Because we have lot of projects
  329. 15:32that are scheduled for delivery this
  330. 15:33year and given the small base. So how
  331. 15:35should one look at the growth for FI27
  332. 15:37and also higher?
  333. 15:38>> Yeah. So
  334. 15:39>> and also how is FI26 been for us sir?
  335. 15:42>> I think we were expecting 120 K we able
  336. 15:45to do that? Yeah, we we already crossed
  337. 15:47that in uh FY26.
  338. 15:50uh uh we are ready with the RHP filing
  339. 15:53in next uh one or two days and uh we
  340. 15:56have closed at 146 crores
  341. 16:00and uh and uh for uh 2627
  342. 16:05uh we have a target of around 247 crores
  343. 16:09and uh you know all the pipelines you
  344. 16:12know we want to restrict to our own uh
  345. 16:14projects and presently which we are in
  346. 16:16which which we have orders and the trial
  347. 16:19orders for execution. So this will
  348. 16:21suffice us uh to achieve the target of
  349. 16:25247 crores.
  350. 16:27>> Okay. And so if I look at the margins, I
  351. 16:29think for the 8 months FI26 the data
  352. 16:30that is released there are around 43%
  353. 16:33sort of EITA margin. So how sustainable
  354. 16:35are these margins sir? And what is
  355. 16:37driving these high margins? Because I
  356. 16:38understand defense and aerospace are
  357. 16:40very highly complex projects. So they
  358. 16:42have higher margin but 43% is a very
  359. 16:44high number. So is that sustainable?
  360. 16:47the you know that uh number of 43% was
  361. 16:51uh for the 8 months uh project but uh
  362. 16:56you know as we have been uh closing on
  363. 16:58uh to
  364. 17:00>> uh you know on the 26 we have uh you
  365. 17:04know we have matured to around 35%.
  366. 17:07So our final numbers of uh 20
  367. 17:11uh 26th March it is coming to around 35
  368. 17:15and we will keep up that uh this thing
  369. 17:18for 26 27 35% is a realistic number.
  370. 17:27>> Okay. Okay. That is fair enough sir. And
  371. 17:29how should one look at the overall
  372. 17:30growth of FI28 and years going ahead and
  373. 17:33also on your capacity our current
  374. 17:35capacity what is the utilization that
  375. 17:37we're running at and what is the peak
  376. 17:39from there
  377. 17:40>> the current capacity we are uh running
  378. 17:44more than 75% now we have very few uh
  379. 17:47capacity left as part of our objectives
  380. 17:50which we have now given to BC is uh you
  381. 17:55know we are investing in 31 new CNC
  382. 17:59machines and putting up putting up this
  383. 18:02facility in our unit 4 where we have
  384. 18:0520,000 ft² space uh available. So the
  385. 18:09entire uh 31 machines in next 6 months
  386. 18:12will be installed
  387. 18:14uh in this facility. So uh to add back
  388. 18:18to your question the capacity wise we
  389. 18:20are already running more than 75%.
  390. 18:23And uh you know we are running short of
  391. 18:27time in in ordering machines. All the
  392. 18:29machines are already ordered now and
  393. 18:31they're all expected in August. So we
  394. 18:34are just waiting for the IPO to finish
  395. 18:36off and uh we just add the capacity and
  396. 18:40uh this capacity we have planned for 26
  397. 18:4427 as well as uh 2728 to achieve uh uh
  398. 18:51to the tune of around 280 crores. The
  399. 18:54new machines
  400. 18:56maximum capacity we can actually
  401. 19:01go up till 280 crores
  402. 19:04>> from the new machines that we put in
  403. 19:05>> in the new machines. Yes.
  404. 19:08>> Okay. Okay. So any sort of what what
  405. 19:10sort of valuation are we targeting for
  406. 19:12the IPO and any sort of timelines that
  407. 19:14one should look at? uh I think uh that
  408. 19:17uh you know separately off the line
  409. 19:20kirin advisor or my you know merchant
  410. 19:22bankers will get get you that valuation
  411. 19:25part I really don't know at this moment
  412. 19:27right now
  413. 19:29>> okay okay sir I'll get back in thank you
  414. 19:32thank you
  415. 19:34>> okay thank you Risha ma'am for the
  416. 19:35question
  417. 19:37so sir we have a question from another
  418. 19:40attendees also so I think is having a
  419. 19:42question please go ahead with your
  420. 19:54Say you're not audible.
  421. 19:56>> I'm audible.
  422. 19:58Hello.
  423. 19:58>> Yes, you're audible now but little bit
  424. 20:00like your voice is not coming.
  425. 20:02>> Okay, now it's better.
  426. 20:04>> Yeah.
  427. 20:05>> Yes. Yes.
  428. 20:06>> Yeah. Uh thank you for the opportunity
  429. 20:09and a very good wonderful practice
  430. 20:11presentation. It was sir. Uh sir uh just
  431. 20:14can you give me the revenue split uh for
  432. 20:17the defense aerospace and the rail comp
  433. 20:19rail part the two sectors that we are
  434. 20:21into forc
  435. 20:23>> so yeah what I will do is I will talk
  436. 20:26about in percentage right now uh what
  437. 20:28has happened is uh uh 65% of the
  438. 20:32business has gone into uh you know uh
  439. 20:35aerospace uh defense and uh only around
  440. 20:3930% is uh the railways the remaining uh
  441. 20:43components are in the semicon industry
  442. 20:46than uh you know other engineering
  443. 20:48industry. So to give a very clear uh
  444. 20:51this thing 65% has come from aerospace
  445. 20:54and defense and uh 30% from the rail and
  446. 20:59this will continue for the next year
  447. 21:01also and uh uh you know to 20 you know
  448. 21:06for 26 27 and 27 28 also aerospace
  449. 21:10defense will grow at a much faster rate
  450. 21:12and rail will not grow the way aerospace
  451. 21:15and defense is growing.
  452. 21:18Thank you sir. So my another question is
  453. 21:21regarding a business model that's built
  454. 21:23to print and build to specs.
  455. 21:25>> Yeah.
  456. 21:26>> So how much Yeah. How much is a
  457. 21:27percentage means what's uh generally
  458. 21:30whatever that we receive?
  459. 21:31>> Yeah. So for uh for uh 20 FI 256 uh what
  460. 21:38we completed this uh 146 uh crores uh it
  461. 21:42has been more of a more build to uh spec
  462. 21:47model you know the customers have given
  463. 21:49us the drawings they have finalized
  464. 21:52uh you know uh build to print you know
  465. 21:54I'm sorry build to print so the customer
  466. 21:57has given us the 3D models uh assembly
  467. 21:59drawings uh three uh you uh 2D drawings.
  468. 22:02So we made as per the print and uh you
  469. 22:07know build to spec has been very little
  470. 22:10you know it's uh 7030 build to print was
  471. 22:1470 build to spec was only 30 but uh this
  472. 22:18year onwards we are focusing you know we
  473. 22:21are building up cap capability in
  474. 22:22engineering and then we want to be uh we
  475. 22:26want to give more of build to spec and
  476. 22:30uh you
  477. 22:32Continue with the build to print models.
  478. 22:35Build to spec advantages and
  479. 22:38disadvantages are you know one is that
  480. 22:40the margins are very high. Uh the
  481. 22:43disadvantage is guest station period to
  482. 22:45convert uh uh the prototype or the ideas
  483. 22:50into production is between 8 to 10
  484. 22:53months. It is worth the margins are
  485. 22:56worth the
  486. 22:58you know the product uh development.
  487. 23:02>> So that is for the first time initially
  488. 23:04once the prototype and everything is
  489. 23:06clear
  490. 23:06>> and we get a repeat order then it's it's
  491. 23:09a it's a
  492. 23:10>> cherry on the cake.
  493. 23:12>> Yes. You know all my Israel customers
  494. 23:14are built to spec. the customer is
  495. 23:17giving us uh you know an idea of a
  496. 23:19product and uh we we make you know
  497. 23:23multiple uh drawings and other things to
  498. 23:26them. Then they then we work together on
  499. 23:29those drawings and move towards the
  500. 23:31prototype and once the prototype uh you
  501. 23:35know is accepted it moves into the
  502. 23:37production. So all my you know we work
  503. 23:39with 11 customers in uh Israel uh apart
  504. 23:43from uh Elvic systems, II, Bach engines,
  505. 23:47palbam you know like this uh uh many
  506. 23:50companies we are working with them most
  507. 23:52of them are you know they are coming in
  508. 23:55uh built to spec models
  509. 23:59you talked about couple of orders one is
  510. 24:01for the 200 of order so that is built to
  511. 24:04specs and HL yeah they are all built to
  512. 24:07specs sir you know an idea is given and
  513. 24:09then uh there is a lot of engineering is
  514. 24:11there and then we work very closely with
  515. 24:14the customer in fine-tuning the
  516. 24:16specifications once the specifications
  517. 24:19are fine-tuned uh we move into the
  518. 24:20prototype
  519. 24:22>> okay and sir just ballpark what is the
  520. 24:26margin sir I know that is it is better
  521. 24:29but
  522. 24:30>> so another uh you know 3 to 5% uh you
  523. 24:34know if I talk about uh uh build to
  524. 24:37print if it is the margins are uh around
  525. 24:4033%. So 5% more you will get in build to
  526. 24:43spec.
  527. 24:44>> Okay. And FI27 sir the build to specs
  528. 24:47and build to print should be 50/50.
  529. 24:49>> It'll be it'll be no it'll be uh 7030
  530. 24:52but you know we are trying to bridge the
  531. 24:53gap. Yeah. 50/50 is that's our idea.
  532. 24:56You're right.
  533. 24:58>> Okay. Okay. Uh good sir. Uh so one last
  534. 25:02question is regarding the payment cycle.
  535. 25:04>> Yeah.
  536. 25:04>> So yeah in both the way in in the
  537. 25:07railway order and in this also in
  538. 25:09>> Yeah. I will tell you the uh normally
  539. 25:11the payment orders are something uh you
  540. 25:14know the payment cycles between all my
  541. 25:16customer bases are uh between 90 to 120
  542. 25:20days uh payment cycle. Uh initially what
  543. 25:24happened is uh before this uh war in
  544. 25:28Israel, there are many shipments which
  545. 25:30we did by ocean and uh they are all
  546. 25:34container load of uh shipments which uh
  547. 25:38got stuck in uh different uh places like
  548. 25:42in Colbo port or in Chennai port or in
  549. 25:45Nawasha port. uh some of them was stuck
  550. 25:49in uh you know in a hifa port also for
  551. 25:52Israel. So the delivery of uh these
  552. 25:54items reaching in Israel or my European
  553. 25:57customers which went by ocean was uh you
  554. 26:00know it took more than 8 months to 10
  555. 26:03months but in February and March some of
  556. 26:06them started easing out they started
  557. 26:09getting uh those so uh the customer
  558. 26:12doesn't want to pay without seeing the
  559. 26:15component itself. So but they have been
  560. 26:18they have been working with us for a
  561. 26:20longer time. So this has been an
  562. 26:22exceptional year for us that uh we got
  563. 26:25uh delayed payments. Uh but what we did
  564. 26:29was in uh in in March in order to
  565. 26:33sustain ourselves we started asking them
  566. 26:36uh the customers advanced payments. So
  567. 26:39most of my Israel customers and European
  568. 26:41customers they have started paying us
  569. 26:43advanced payments to the tune of around
  570. 26:4630 to 50% of the order value. So this is
  571. 26:49going to we will continue with that
  572. 26:51model and uh the 50 the remaining
  573. 26:54balance amount is on delivery. So we
  574. 26:57will continue. So uh FY 26 27 our uh uh
  575. 27:05you know payment cycles and all will be
  576. 27:07much uh easier and the working capital
  577. 27:11uh will be much better compared to the
  578. 27:14earlier year.
  579. 27:16>> Okay. But sir since the way under the
  580. 27:19atma theme there are many companies they
  581. 27:22are into this critical components of
  582. 27:27>> defense and everything. So then we get
  583. 27:28this
  584. 27:30advanced payment really a niche product
  585. 27:34or it's what it is exactly
  586. 27:35>> sir I'll tell you the Israel uh
  587. 27:37customers we have under control now we
  588. 27:39don't have control with uh the
  589. 27:41government of India projects see we are
  590. 27:43working on a large project for drone uh
  591. 27:46assembly for uh the artillery we have an
  592. 27:50order which I mentioned earlier for an
  593. 27:5285 cr order uh this thing the government
  594. 27:56doesn't give us uh any benefit in you
  595. 27:58know uh the government of India see if
  596. 28:01we have to be there in defense business
  597. 28:04we really have to put in all the working
  598. 28:07capital uh requirement from us see apart
  599. 28:10from that we have to give an advanced
  600. 28:12PPG you know performance bank guarantee
  601. 28:14of 10% of the order value
  602. 28:16>> and uh all the payments are after
  603. 28:19delivery only you know it's not you know
  604. 28:22you won't get advanced payments for any
  605. 28:24of the defense projects this is uh uh
  606. 28:27problem you know you know what we uh
  607. 28:32what we have been working uh with the
  608. 28:34government you know for the you know the
  609. 28:37so we have to live with this system if
  610. 28:39we have to be in the defense business
  611. 28:41>> got it sir thank you sir thank you for
  612. 28:44patiently answering on the answer to my
  613. 28:46question sir I join in the kos thank you
  614. 28:48very much and best of luck for sir
  615. 28:50>> thank you sir
  616. 28:52>> thank you sir for the questions
  617. 28:57So sir, next question I have from Mr.
  618. 29:00Priyank I guess. Priyanch sir, please go
  619. 29:02ahead with the question.
  620. 29:06>> Yeah. Hello sir. Hope I'm audible.
  621. 29:08>> Yes pri.
  622. 29:10>> Yeah sir my first question on the
  623. 29:12revenue split that you mentioned for
  624. 29:14FI26. Uh so you mentioned uh 65% from um
  625. 29:18a aerospace 30% from railway.
  626. 29:21>> Yeah. But if I recall correctly sir uh I
  627. 29:23think uh two months back when we uh had
  628. 29:25a inter uh one more uh discussion right
  629. 29:28I think for 8 month 26 uh uh 47% was
  630. 29:33already from defense and uh 37 was
  631. 29:36already from uh railway
  632. 29:38>> so so let me tell you uh the 3 months
  633. 29:41you know I'm I'm talking about the full
  634. 29:43year now so the full year uh we had a
  635. 29:47lot of invoicing done in February March
  636. 29:50for the defense sector
  637. 29:51especially at the component level on uh
  638. 29:54on the defense sectors. So the game plan
  639. 29:58uh right now for us is to more move more
  640. 30:01more into aerospace and defense rail is
  641. 30:04uh there but you know rail as we have
  642. 30:06been working only with the OEMs like
  643. 30:09seammens and also and all so that will
  644. 30:11continue to grow. So here I have
  645. 30:14combined aerospace and defense together.
  646. 30:16So earlier you know we had uh split you
  647. 30:19know between aerospace uh defense uh
  648. 30:23semicon and others and railways you know
  649. 30:25four different sectors we had now in
  650. 30:28order to make our uh you know there's a
  651. 30:31very thin line between aerospace and
  652. 30:33defense so because the similar
  653. 30:34components like HL you know uh I would
  654. 30:38call it as defense some will call it as
  655. 30:40aerospace so you know so I've tried to
  656. 30:42combine aerospace and defense so
  657. 30:44aerospace defense has been
  658. 30:46Last year when we have completed for
  659. 30:48March 31st has been 67 65
  660. 30:52around 30 is rail and all others are you
  661. 30:56know semicon machineries and uh you know
  662. 30:59other uh businesses uh altogether.
  663. 31:04>> Okay understood sir. So um one more
  664. 31:07follow up on the split part also sir
  665. 31:09like uh if I see from FI23 to 25 right
  666. 31:13like uh uh we had like a huge dependency
  667. 31:16on railways right uh railway growing
  668. 31:18from 20% of our revenue to almost 70% by
  669. 31:2125
  670. 31:22>> correct
  671. 31:23>> so u will going ahead like aerospace and
  672. 31:27defense will be the key segment that we
  673. 31:29uh looking to pursue or there could be a
  674. 31:32uh seasonality also
  675. 31:34>> no uh I'll tell you uh you know it's a
  676. 31:37good question you asked. See uh we were
  677. 31:39in a growth stage in uh uh in 23 24 in
  678. 31:44early stages different sector uh this
  679. 31:47thing you know to get into vendor
  680. 31:50registration and getting the approvals
  681. 31:52in Israel and all it's a time consuming
  682. 31:54and you require a lot of patience you
  683. 31:56know and get so we did all this basics
  684. 31:59in uh uh 24 and 25 so now we are seeing
  685. 32:04those order orders coming in you know
  686. 32:06backto-back orders coming from the
  687. 32:07aerospace defense
  688. 32:08So when you actually prove them you know
  689. 32:11you now start getting orders see in rail
  690. 32:14sector what is happening is um you know
  691. 32:18there's a stagnation uh which is coming
  692. 32:20in uh you know the types of components
  693. 32:25and the projects which we are coming so
  694. 32:28European uh rail you know like uh also
  695. 32:31or semens or they're all presently
  696. 32:34because of the economic conditions what
  697. 32:36is happening many of the projects are
  698. 32:38going slow. So, uh railway will not grow
  699. 32:43the way aerospace and defense is uh
  700. 32:45happening. You know, that will be only
  701. 32:47around 10 to 15% uh annually we'll be
  702. 32:50growing uh in the rail sector. So
  703. 32:53aerospace and defense there's ample
  704. 32:55growth you know and uh the type of
  705. 32:59projects which we handle uh we see
  706. 33:02backto-back inquiries coming in on
  707. 33:04similar projects and uh presently we are
  708. 33:07not geared either on uh infrastructure
  709. 33:11uh to handle large projects uh because
  710. 33:14uh as I also mentioned to become an
  711. 33:16Airbus or a Boeing we require a
  712. 33:18controlled atmosphere factory. The
  713. 33:20entire factory has to be uh air
  714. 33:23conditioned factory. Presently we don't
  715. 33:25have that. So we are going to build in
  716. 33:27next 6 months a controlled uh
  717. 33:30temperature factory once this factory is
  718. 33:33up. So we are open up for you know
  719. 33:36either Rolls-Royce because we are seeing
  720. 33:38Rolls-Royce name coming up uh you know
  721. 33:41in the news uh they're setting up uh
  722. 33:45bigger plants in Bangalore and in Hosur
  723. 33:47and all. So we have ample opportunities
  724. 33:49you know in uh aerospace defense. We
  725. 33:52will focus on this growth in the coming
  726. 33:54years.
  727. 33:56>> Understood sir. Uh yeah this is very a
  728. 33:58prudent strategy sir. One more uh number
  729. 34:01that I want to understand is uh how much
  730. 34:03Israel as a overall revenue basket could
  731. 34:07contribute to.
  732. 34:08>> So presently it is around 20%. Sir
  733. 34:12>> 20%. uh it will grow up till uh 30 to
  734. 34:1635% in uh 2728 it will grow very fast.
  735. 34:22>> Okay. Given the uh pipeline and the
  736. 34:24order visibility.
  737. 34:25>> Yes. Yes.
  738. 34:27>> Okay. Sir one more question. Uh out of
  739. 34:29this uh aerospace and defense what is a
  740. 34:32split between the sub assemblies and the
  741. 34:35component u for
  742. 34:38>> 26. So for 2526
  743. 34:41uh component level is uh uh is around
  744. 34:4660% and assembly is around 40% right
  745. 34:48now.
  746. 34:50>> Okay. Uh any guidance s how this split
  747. 34:53will look like in next one or two years.
  748. 34:55>> So you know we are focusing more on
  749. 34:58assemblies now uh rather than the
  750. 35:02component level but we are not leaving
  751. 35:03any opportunity on the component level
  752. 35:05also. uh when we start manufacturing
  753. 35:08components for engines you know we are
  754. 35:10making uh components for engines which
  755. 35:13is uh uh there's a company called BHSH
  756. 35:17engines in uh
  757. 35:20uh in Tel Aviv uh those are all will go
  758. 35:23a component only it will not go as a sub
  759. 35:26assembly or an assembly when it comes to
  760. 35:28missiles missile carriers or missiles uh
  761. 35:31systems or uh launchers or such type of
  762. 35:35defense projects it will go as a sub
  763. 35:38assembly or an assembly.
  764. 35:41>> Okay, understood sir. Sir uh um we
  765. 35:44discussed about the railway but we miss
  766. 35:45out on the semiconductor part right? So
  767. 35:48the PCBs that we make that also goes
  768. 35:50into aeros.
  769. 35:51>> No no we are not making PCBs we are
  770. 35:53making uh components for the machines
  771. 35:57which manufacture PCBs. So the
  772. 36:00components uh we supply to a company
  773. 36:03called ASM technologies. they
  774. 36:05manufacture machines for Tata
  775. 36:07Electronics or Micron or any of those
  776. 36:10you know or Apple uh iPhone
  777. 36:12manufacturers. So they make machines I
  778. 36:15make components assemblies sub
  779. 36:17assemblies uh to the machine
  780. 36:20manufacturer.
  781. 36:21So since these machines are used in
  782. 36:24semiconductor industry so we are just
  783. 36:27you know for our own convenience we have
  784. 36:29categorized as semicon industry.
  785. 36:33>> Okay. So sir the focus will be there
  786. 36:35also going ahead or
  787. 36:37>> yeah we are not focusing much on this uh
  788. 36:39because we are uh we have been uh an
  789. 36:43approved customer for uh these two
  790. 36:45customers you know and they are
  791. 36:47receiving backto-back orders. So any
  792. 36:50inquiries coming in we are taking up
  793. 36:51because we don't require a separate
  794. 36:54infrastructure for manufacturing this
  795. 36:56this will go along with uh aerospace and
  796. 36:59defense uh projects. So we take up as
  797. 37:02and when uh the projects are coming from
  798. 37:04uh these customers.
  799. 37:07>> Okay. So the pro product that you built
  800. 37:10for these two semicon company sir uh
  801. 37:12like do you have other competitor also
  802. 37:15uh like in India?
  803. 37:17>> Correct. So there is a company called
  804. 37:19Micron Industry which is setting up a
  805. 37:21massive plant in uh uh in uh Ahmedabad
  806. 37:25in uh in Gujarat in Saland area. And
  807. 37:29then uh of course Tata Electronics is
  808. 37:31building up new new plants in Gojhati.
  809. 37:34So there's massive orders for
  810. 37:36manufacturing these machines uh with
  811. 37:38these companies. So we are trying to
  812. 37:41work with them. We see that there is a
  813. 37:44growth potential but uh because of our
  814. 37:47limited uh uh capacity right now we
  815. 37:51would like to focus on uh the aerospace
  816. 37:54defense itself. So that will only be a
  817. 37:58you know uh anything which comes it'll
  818. 38:00just add into our top line.
  819. 38:04>> Okay. So in your next year estimate uh
  820. 38:08240 C or something. So that is not
  821. 38:10accounted right. Uh
  822. 38:11>> that is that is very small uh it is less
  823. 38:13than 3%.
  824. 38:15>> Okay.
  825. 38:16>> Okay. Thank you sir for answering my
  826. 38:18question.
  827. 38:18>> Thank you Priyan.
  828. 38:20>> Thank you Priyan sir for the questions
  829. 38:22and thank you Shras for the answer. So
  830. 38:25sir, we have a next question from Mr.
  831. 38:27Rahul. So they have raised their hand.
  832. 38:30So Rahul sir, you can go ahead with the
  833. 38:32question.
  834. 38:37>> Yeah. Hi, I'm audible.
  835. 38:39>> Yes.
  836. 38:40>> Yeah. Good morning sir. Uh first of all,
  837. 38:42thanks for the brief introduction. It
  838. 38:44was very helpful. I'm I'm a bit new new
  839. 38:47to the company. So just a few basic
  840. 38:48questions to start with. uh if you can
  841. 38:50just please take me through this sales
  842. 38:52growth that we have seen in this year 22
  843. 38:54kores in 25 and 140 kores in 26 this is
  844. 38:58a very large growth if you can maybe
  845. 39:00specifically take me through which
  846. 39:02programs which customers led to this
  847. 39:04growth yeah
  848. 39:06>> okay so uh the the first and the second
  849. 39:09number which is small number this is
  850. 39:11purely 100% rail business and a very
  851. 39:14small business of HL
  852. 39:16>> now the third number is there are in uh
  853. 39:20in between uh 24 25 we were building lot
  854. 39:24of build to spec projects you know uh
  855. 39:26all trial orders and all this got
  856. 39:28converted into this current year so you
  857. 39:31will see a bigger number
  858. 39:32>> in this year then the major project
  859. 39:35which we started working on is the drone
  860. 39:38project where we built the all the
  861. 39:41mechanical components for the our small
  862. 39:44acquisition which we did in uh NOA so
  863. 39:47the major
  864. 39:48portion is come from the artillery
  865. 39:51division where in which we manufactured
  866. 39:54all the components for the loitering
  867. 39:57minion drone. So we did all the
  868. 40:00component level subasssembly level for
  869. 40:02this uh drone projects. So that has been
  870. 40:05a substantial growth for the uh 25 26
  871. 40:09year. Uh added to this we also executed
  872. 40:12some large orders for uh Elvbit systems
  873. 40:15and uh a company called Palbam in
  874. 40:18Israel. Those are all new customers
  875. 40:20added in the
  876. 40:22uh financial year. So these all orders
  877. 40:25uh built up these numbers for this uh
  878. 40:28140 plus CR.
  879. 40:30>> Got it. Uh if I may just uh cross
  880. 40:33question a bit on this answer. Uh I
  881. 40:36believe the drone business that our
  882. 40:38acquired company got was approximately
  883. 40:4180 crores right 80 85
  884. 40:43>> 85 yeah 85 crores
  885. 40:45>> so in that our component would be what
  886. 40:4815 20 kores at max not
  887. 40:50>> no it no it'll be somewhere around uh
  888. 40:52around 35 36 crores
  889. 40:55>> okay 35 36 crores got it and the second
  890. 40:58thing that you said was BTS helped us
  891. 41:01scale in this year we had a lot of
  892. 41:02programs which converted into commercial
  893. 41:05this year, right?
  894. 41:06>> Correct. Correct. This is for the Elvit
  895. 41:07systems uh H
  896. 41:10>> and uh
  897. 41:12then the then we had a company called
  898. 41:15Pulbomb. Then we also have a company
  899. 41:17called BCH Engines.
  900. 41:19>> So like this you know all these got
  901. 41:21converted into orders that will be
  902. 41:23somewhere around uh uh another 40 45 CR.
  903. 41:28>> Okay. 40 45 CR from this side also.
  904. 41:31>> Correct. A rail business also grew up. M
  905. 41:34>> rail business also grew up to the tune
  906. 41:36of around 40 45
  907. 41:40>> but then I believe in the answer to the
  908. 41:43previous participant you said that BTS
  909. 41:45was a smaller contribution than BTP this
  910. 41:48year
  911. 41:49>> see you see the uh you see the entire
  912. 41:51year's numbers the numbers are all uh
  913. 41:54coming exactly to the tune of what I
  914. 41:56have made so uh there's a again you know
  915. 42:01uh build to spec has been with uh some
  916. 42:04of the Israel customers. You know what I
  917. 42:06mentioned and uh in this uh drone uh
  918. 42:10assemblies also some of the electronics
  919. 42:13and subasssemblies also we have done all
  920. 42:15the specification designs specification
  921. 42:19uh you know because it took us more than
  922. 42:21a year for us to build all those spec
  923. 42:24you know all those uh capabilities.
  924. 42:26>> So so there is a thin line between uh
  925. 42:30those numbers here. So you should not
  926. 42:33worry much about this but we will have
  927. 42:36we will have a bigger
  928. 42:38>> doubt about that. So my main query for
  929. 42:41asking this was because defense
  930. 42:43customers usually take a long time to
  931. 42:45scale and exactly we have seen a rather
  932. 42:49well of course we have we have gone
  933. 42:50through that trial phase development
  934. 42:52phase but then suddenly we have seen a h
  935. 42:55youth spike so hence I was surprised as
  936. 42:57to what suddenly changed with these PSUs
  937. 42:59and larger companies. Yeah, but if you
  938. 43:01see uh this coming year also uh the
  939. 43:04projects which will get converted into
  940. 43:06orders this year uh these projects all
  941. 43:09the trials are being uh done in 25 26
  942. 43:12itself but you will not see many any
  943. 43:15numbers at all. So you will see those
  944. 43:16numbers only in this uh current year and
  945. 43:19next year. So since the guest station
  946. 43:21periods are much higher so you know and
  947. 43:24uh uh approvals take a longer time so we
  948. 43:28require to have and modifications also
  949. 43:31you know lot of changes happens in the
  950. 43:34design itself you know based on the
  951. 43:36requirement so we should have yeah we
  952. 43:38take a you know a lot of patience and do
  953. 43:41it slowly.
  954. 43:42>> Got it. Just to continue on this
  955. 43:44approvals part so like I said I'm a bit
  956. 43:45new to the business. I just wanted a bit
  957. 43:47more understanding on the business
  958. 43:48quality. From what I understood that we
  959. 43:51are primarily into machining, right?
  960. 43:54Would that be the right thing to say?
  961. 43:55>> So I would say uh our bread and butter
  962. 43:58we started off with machining. Then we
  963. 44:00moved into sheet metal component. Then
  964. 44:02we have a 3D printing facility for uh
  965. 44:05the drone systems itself.
  966. 44:07>> Then we also built a a little bit of uh
  967. 44:12integrating electronics into the you
  968. 44:15know mechanical part. Then we are now a
  969. 44:18completely an assembler. You know we can
  970. 44:20assemble electrical, electronics, sheet
  971. 44:23metal components, machined components,
  972. 44:27uh test them and give them as an
  973. 44:29assembly.
  974. 44:30>> Got it. So my question here is that we
  975. 44:33are making significantly high margins
  976. 44:37when I look at compared to other players
  977. 44:39and being in the more of the mechanical
  978. 44:41area being the machining part. uh there
  979. 44:45would be a lot of players who would be
  980. 44:47in our segment competing with us. So if
  981. 44:50you can share more on that from that
  982. 44:53perspective as to what is the complexity
  983. 44:54in our business, how are we able to make
  984. 44:56such margins? Uh maybe if you can add in
  985. 44:59the approval process or something, how
  986. 45:01long does it take because I feel a lot
  987. 45:03of people can get into the segment.
  988. 45:06>> Uh you're right on this. uh uh the thing
  989. 45:10is uh our uh you know we want to be
  990. 45:13slightly different from our competition.
  991. 45:16Uh there are three aspects we are giving
  992. 45:18uh them uh you know we have built up a
  993. 45:20strong engineering uh uh base in our own
  994. 45:24system. So when an inquiry comes we work
  995. 45:26very closely uh with the customers uh in
  996. 45:30fine-tuning the specifications. So the
  997. 45:32customers uh come to us you know
  998. 45:35sometimes you know it is a mutual uh uh
  999. 45:39understanding of the product itself you
  1000. 45:41know what we understand and you know
  1001. 45:43based on our experience and their
  1002. 45:44experience we try to build a you know a
  1003. 45:46new product itself this is from the
  1004. 45:48engineering side second thing is a top
  1005. 45:51you know milwork is known for the
  1006. 45:53topnotch consistent quality between
  1007. 45:56batch to batch we have been giving
  1008. 45:58consistent quality so the customer is
  1009. 46:00completely ly happy with the the
  1010. 46:03consistency of the quality and the third
  1011. 46:05thing is on the uh identification of the
  1012. 46:09supply chain of the raw materials or any
  1013. 46:12of these things. So we are able to get
  1014. 46:15hold of our supply chain you know
  1015. 46:17whether it is a uh you know special
  1016. 46:20grade of aerospace material or any of
  1017. 46:23those we are able to get those raw
  1018. 46:25material at a much faster rate with a a
  1019. 46:28strong supply chain base. Then end of
  1020. 46:30the day customer wants a top-notch
  1021. 46:33quality and on time.
  1022. 46:35>> These two things you keep uh them and
  1023. 46:38then the repeat orders is uh not a
  1024. 46:41problem. And we see that uh many of our
  1025. 46:45peer groups you know are not able to you
  1026. 46:48know give a consistent quality and uh uh
  1027. 46:52on-time delivery. So they miss out on
  1028. 46:54some some tier you know some some
  1029. 46:57important projects. So that will be the
  1030. 47:00key and that we will continue to hold on
  1031. 47:02in the coming years that we want to make
  1032. 47:05it as a mantra in our own uh you know in
  1033. 47:08our the way we work.
  1034. 47:10>> Got it. Very clear. So maybe that we can
  1035. 47:12also understand this question in another
  1036. 47:14way. Uh if we can uh like you told me
  1037. 47:17the customers that led to this growth in
  1038. 47:19this year. Maybe if you can specify the
  1039. 47:21key programs for example a particular
  1040. 47:23aircraft or a particular defense vehicle
  1041. 47:26or something that led to this uh what
  1042. 47:30were the key programs for us this year?
  1043. 47:32>> So so there I would like to mention
  1044. 47:34about this two programs. One is uh we
  1045. 47:37are working on a it's called as a saddle
  1046. 47:39project. This is a missile carrier
  1047. 47:42system for an F-16
  1048. 47:44uh or an F-35 aircraft where a carrier
  1049. 47:47is used to hold the missile onto an
  1050. 47:50aircraft.
  1051. 47:51>> So this is a sheet metal part uh which
  1052. 47:55has uh plenty of uh machined components
  1053. 47:58assemblies subasssemblies riveting
  1054. 48:02>> uh you know and then you know it's it's
  1055. 48:04a assembly itself. So
  1056. 48:07>> um all the F-16s uh in Israel you know
  1057. 48:11Israel is having around 200 F-16 and
  1058. 48:13F-35 aircrafts
  1059. 48:15>> okay
  1060. 48:15>> uh that requires an uh overall you know
  1061. 48:19MRO activity or the fitting of all this
  1062. 48:22this career will fall off along with the
  1063. 48:24missile. So extensive use of this
  1064. 48:26aircraft right now in this uh Middle
  1065. 48:28East war. So they require all backups
  1066. 48:31you know they require a lot of stock you
  1067. 48:34know. So uh we have been one of the
  1068. 48:37strong players a strong supplier for uh
  1069. 48:39these type of uh projects.
  1070. 48:41>> Very
  1071. 48:42>> uh yeah and this will grow in a much
  1072. 48:44faster rate. Even though it is a small
  1073. 48:47pie right now they are trying to you
  1074. 48:50know find out uh a new supplier base in
  1075. 48:53India you know being milworks being a
  1076. 48:55predominant one but their existing
  1077. 48:57suppliers are all in France. So they are
  1078. 49:00trying to move all those because of the
  1079. 49:01volumes and other things they trying to
  1080. 49:03>> move to India. Uh the other important
  1081. 49:06significant project which Madus
  1082. 49:09mentioned we are working with um
  1083. 49:12uh H for a fuselage project and this
  1084. 49:16will actually
  1085. 49:19>> uh this is for an ALH uh aircraft
  1086. 49:22>> helicopter.
  1087. 49:23>> Yeah. So this is called as a fuselage
  1088. 49:26project which we are presently uh become
  1089. 49:29L1 once uh once we get this order and uh
  1090. 49:34you know this will change the Milwork's
  1091. 49:36way you know we'll be in the big league
  1092. 49:38like Dynamatic Technologies or
  1093. 49:42>> Azad Engineering so
  1094. 49:44>> I know that should happen in uh you know
  1095. 49:472728
  1096. 49:49>> got it no so uh what you said were the
  1097. 49:52programs that are going to drive us for
  1098. 49:53this year and the next and the future
  1099. 49:55but I want to understand the existing
  1100. 49:57programs that have driven this one.
  1101. 49:58Yeah, the existing one I mentioned about
  1102. 50:00the saddle project you know that uh
  1103. 50:03itself but the future is with the h. So
  1104. 50:06there are smaller projects which we
  1105. 50:08worked uh with Elbit systems and other
  1106. 50:11uh this thing in Israel. They're all
  1107. 50:13very smaller projects. They're all
  1108. 50:15specific project name is not there
  1109. 50:18because of the
  1110. 50:19>> of course
  1111. 50:19>> client confidentiality.
  1112. 50:21>> Of course. No. So the reason was uh to
  1113. 50:23to ask this was to understand the number
  1114. 50:26of vendors that we compete with usually
  1115. 50:28with our customers. Is it like a huge
  1116. 50:31base since we are doing a rather uh not
  1117. 50:34as complex work since we are doing more
  1118. 50:37of sheet metal more of
  1119. 50:39machining are there more vendors per
  1120. 50:41customer for our product or
  1121. 50:44>> yeah I I'll tell you uh this uh see the
  1122. 50:48the customers are very same customers
  1123. 50:51for many of the peer group like Azad
  1124. 50:54engineering also works with Elbid or uh
  1125. 50:57you know Dynamatic also or sanssara
  1126. 51:01engineering you know they all work with
  1127. 51:03the same but on different projects
  1128. 51:06>> so the pi is you know much bigger so you
  1129. 51:09know I think uh there's space for
  1130. 51:11everyone to grow
  1131. 51:12>> got it
  1132. 51:13>> so you know and uh we are at the right
  1133. 51:15time uh being part of the spy
  1134. 51:18>> very clear and just coming to these
  1135. 51:20orders that we are planning to win the
  1136. 51:22Israel 200 cr order the HL 70 cr order
  1137. 51:26if you can give more info about this but
  1138. 51:28the timelines means uh the 200 cr order
  1139. 51:31is the same F-16 program or some other
  1140. 51:34program.
  1141. 51:34>> Yeah, it's a F-16 F-35 program.
  1142. 51:38This uh is presently on the trial base.
  1143. 51:40You know, we have a trial order and
  1144. 51:42advance amount paid for the tooling.
  1145. 51:44>> The customer already has done that and
  1146. 51:46presently it is under execution. So
  1147. 51:48trials is likely to be con completed end
  1148. 51:51of September this year. Okay. And uh the
  1149. 51:54approvals will come by October end and
  1150. 51:57uh Israel team is going to be here in uh
  1151. 51:59in July. They will help us uh you know
  1152. 52:02build this entire project. So three
  1153. 52:05member team you know they will help us
  1154. 52:07set up the fixturing line or production
  1155. 52:09line everything in July. And our idea is
  1156. 52:13to you know out of the 200 crores at
  1157. 52:15least 100 crores to be you know to
  1158. 52:17dispatch before March.
  1159. 52:22>> So you are saying that that you will get
  1160. 52:23approved in September October and
  1161. 52:25>> within
  1162. 52:27five months you will sell 100 C.
  1163. 52:29>> Yeah. Yeah.
  1164. 52:30>> Okay. And uh the 240 K number that we
  1165. 52:33are guiding for FI27 100 K will be
  1166. 52:36>> will come from this. Yes.
  1167. 52:38>> Okay. Got it. And then uh we are working
  1168. 52:41on uh this HAL project as Musar
  1169. 52:44mentioned on the fuselage project. That
  1170. 52:47uh timeline is uh you know we are likely
  1171. 52:50to get a trial order uh in the month of
  1172. 52:53July or first week of August and then
  1173. 52:56the trial order will uh extend up till
  1174. 52:59December this year
  1175. 53:01>> and uh at least 35 to 40 crores we will
  1176. 53:05be building in this year out of the 71
  1177. 53:07cr. So, so these are all only the two
  1178. 53:11projects which we have mentioned but
  1179. 53:12there are many projects which we have
  1180. 53:14bid you know and uh we will you know
  1181. 53:17those are all at the smaller uh levels
  1182. 53:19you know it's around 12 crores or 20
  1183. 53:21crores you know this and all will add up
  1184. 53:23so if any of these these projects fell
  1185. 53:25apart or delay or anything there are
  1186. 53:27other projects to fill up these numbers
  1187. 53:30>> got it okay and so that's what I was
  1188. 53:32going to ask next as we know our
  1189. 53:34business would be more of driven program
  1190. 53:37to program and hence very lumpy. If for
  1191. 53:40example one program ends as we know
  1192. 53:42usually the defense
  1193. 53:44pro procurers procure it uh for one
  1194. 53:49particular batch of aircrafts or one
  1195. 53:50it's not a recurring order basically.
  1196. 53:52>> No no this uh Elvid project what we are
  1197. 53:54talking about the saddle project it is
  1198. 53:56for a 15-year program and uh we we are
  1199. 53:59signing off uh for 5 years. So this is
  1200. 54:04uh you know and there'll be backtoback
  1201. 54:06similar projects coming in uh with
  1202. 54:09different ranges you know different
  1203. 54:10sizes of those carriers you know missile
  1204. 54:12careers. So
  1205. 54:14>> there will be backto-back projects. So
  1206. 54:17it's it's only you know how much uh we
  1207. 54:19can uh uh you know take it up and
  1208. 54:23deliver.
  1209. 54:24>> You have a five year signed commitment.
  1210. 54:26You are saying
  1211. 54:28>> we have yeah we have Yes. Yes. We have
  1212. 54:30>> annual procurement is how much
  1213. 54:34in value terms?
  1214. 54:35>> Uh annual
  1215. 54:36it is a minimum of 200 cr on this
  1216. 54:39project alone. Annual procurement 200
  1217. 54:42kores for the next five years that 100%
  1218. 54:44locked in.
  1219. 54:44>> Yeah, exactly.
  1220. 54:46>> Okay, got it. And uh what is this pro
  1221. 54:49product called exactly? I just couldn't
  1222. 54:51hear you clearly.
  1223. 54:52>> This is called as a missile carrier.
  1224. 54:55>> C A R R I E R. Correct.
  1225. 54:58>> Missile carrier for the F-16 and also
  1226. 55:00the F-35.
  1227. 55:03>> Correct, sir.
  1228. 55:04>> Got it. Uh okay. Okay. But any large
  1229. 55:08programs uh for this 140 kores that were
  1230. 55:11in FI26 that will not repeat in FI27
  1231. 55:15maybe those were one-off programs that
  1232. 55:17only came in FI26 anything like that
  1233. 55:19>> right right now none of the projects we
  1234. 55:21are working like that we are working on
  1235. 55:23all minimum fiveyear projects because
  1236. 55:25there the customer is investing on the
  1237. 55:27tooling itself so tooling itself is will
  1238. 55:30come to around four five crores and uh
  1239. 55:32the customer will pay in advance so they
  1240. 55:34are very clear this this tool Yeah,
  1241. 55:36these tools needs to be used for a
  1242. 55:38longer term.
  1243. 55:40>> Okay. So, the tooling for the F-16 and
  1244. 55:42the F-35 is being provided by the
  1245. 55:44Israeli customer to us.
  1246. 55:46>> Correct. Yeah, they will pay for us.
  1247. 55:48>> And just one last question. Sorry to the
  1248. 55:50moderator. Just one last question.
  1249. 55:52Initially the plans for FY28 were much
  1250. 55:55lower. I believe we were not targeting
  1251. 55:57as much based on our previous
  1252. 55:59interactions. But now we are targeting
  1253. 56:01much more. So, what has changed now? So,
  1254. 56:03so I'll tell you in last two three
  1255. 56:05months uh many Israel teams have visited
  1256. 56:09our factory now
  1257. 56:10>> and uh we have given them all the
  1258. 56:13projections our our unit 4 is going to
  1259. 56:16be a world-class factory and for every
  1260. 56:19uh interaction with uh any of our
  1261. 56:22customers they are asking us to build us
  1262. 56:24a air conditioned fully temperature
  1263. 56:27controlled factory presently we don't
  1264. 56:29have
  1265. 56:30>> and uh we have put up a blueprint we are
  1266. 56:32just waiting for uh uh the IPO's uh
  1267. 56:36closure. Once this is closed, we will be
  1268. 56:39ready with this uh in 2 months you know
  1269. 56:42temperature controlled and we al yeah
  1270. 56:44and this is a minimum requirement
  1271. 56:47because
  1272. 56:48>> uh these parts are all some of are made
  1273. 56:50of titanium and all you know you they
  1274. 56:53they don't like you know it it needs to
  1275. 56:55be a very clean you know atmosphere to
  1276. 56:58manufacture this.
  1277. 56:59>> Agreed.
  1278. 57:01But what about the machines? We will
  1279. 57:03also need to import machines. That will
  1280. 57:05take a lot.
  1281. 57:05>> Some machines. Some machines we have
  1282. 57:07already ordered, sir. They're all on the
  1283. 57:08pipeline. Some of them
  1284. 57:10>> I believe the plan is for 46 machines.
  1285. 57:12How many do we have in hand already?
  1286. 57:14>> 31 is uh we have ordered already 31 and
  1287. 57:19some of them we have paid advances.
  1288. 57:21Others and all are you know let me be
  1289. 57:25very honest we don't have money right
  1290. 57:26now. Once post yeah post IPO we will get
  1291. 57:30all those
  1292. 57:31>> and just one last question sorry again
  1293. 57:33uh what is the name of this drone
  1294. 57:35company that you have acquired how much
  1295. 57:37have you acquired of that company and
  1296. 57:39what is the name that you are saying
  1297. 57:41>> yeah it is a quick pay drones Q quickay
  1298. 57:46drones
  1299. 57:46>> quick
  1300. 57:47>> this is yeah this is based out of uh
  1301. 57:50Nida
  1302. 57:51>> okay
  1303. 57:51>> and uh this uh they have been working on
  1304. 57:54this drone for last 5 years
  1305. 57:56>> okay And uh they uh they they work only
  1306. 58:00on three specific uh category of uh
  1307. 58:05drones. One is the one drone is uh
  1308. 58:09>> uh the loitering union drone or the
  1309. 58:12kamakazi drone. Yes.
  1310. 58:14>> Which uh we are presently executing an
  1311. 58:16order right now.
  1312. 58:18>> Okay.
  1313. 58:18>> And uh that order will be invoiced uh by
  1314. 58:21quick pay to the artillery next next 10
  1315. 58:24days.
  1316. 58:25>> Okay.
  1317. 58:25>> Okay. And uh the second drone is uh uh
  1318. 58:29this is called as ibot. This drone is
  1319. 58:32presently uh used in uh in CNN and
  1320. 58:36Pangong Lake and all. We have an
  1321. 58:38exclusive you know we are the only
  1322. 58:40approved army uh drone supplier. This uh
  1323. 58:45drone can identify uh the dead bodies or
  1324. 58:49any of those soldiers in the border
  1325. 58:51areas to the tune of 15 m. Pra depth
  1326. 58:57any of those uh buried our drones can
  1327. 59:01identify and help the uh rescue team.
  1328. 59:04>> Okay.
  1329. 59:05>> So this drones uh we have already
  1330. 59:07supplied around 12 drones in last two
  1331. 59:09years and uh presently we are working on
  1332. 59:13another large order for the eastern
  1333. 59:16command
  1334. 59:17>> for the kami kazi or for this one this
  1335. 59:20particular
  1336. 59:20>> I bought I bought this.
  1337. 59:22>> Okay. How much do we own of this
  1338. 59:24company?
  1339. 59:26>> So, uh this company uh last year did
  1340. 59:29they did around 12 crores. They were
  1341. 59:31very small. Now they are uh growing. Now
  1342. 59:35they are working on uh uh another uh
  1343. 59:38shine type of drone you know. So that is
  1344. 59:42under development that uh drone will be
  1345. 59:45ready uh in 2728.
  1346. 59:48>> Okay. But would we be owning more than
  1347. 59:5050% of this company?
  1348. 59:52>> No, we are we are presently owning uh
  1349. 59:55only around uh 8 and a half% presently.
  1350. 59:58>> Yeah, presently we are owning uh this
  1351. 1:00:01thing. So for Milwork's numbers I have
  1352. 1:00:04for this current year I have not taken
  1353. 1:00:06any of those drone projections but uh
  1354. 1:00:09the you know as we progress because uh
  1355. 1:00:12uh those are all subjective defense
  1356. 1:00:14orders you know. So we are working with
  1357. 1:00:17uh strong content contenders in that
  1358. 1:00:20area like solar industries or you know
  1359. 1:00:23all those. So but specifically for these
  1360. 1:00:26uh three drones we are focusing uh this
  1361. 1:00:29thing we are spending we are spending
  1362. 1:00:31lot of uh time uh resources and all on
  1363. 1:00:34the development of these drones.
  1364. 1:00:36>> Great Sedar sir it was great interacting
  1365. 1:00:38with you. Actually I have a lot more
  1366. 1:00:40questions but I'll get in touch via GY.
  1367. 1:00:42Sure. I I would love to get on a call
  1368. 1:00:44with you and understand the
  1369. 1:00:45>> Thank you Rael. Thank you very much.
  1370. 1:00:47>> Thank you Ra sir for your questions.
  1371. 1:00:50Actually due to I'm concerned we are
  1372. 1:00:51having another investors. So thank you
  1373. 1:00:54sir. So sir actually kana can we take a
  1374. 1:00:58questions from question box because
  1375. 1:01:00there are questions in the Q&A session.
  1376. 1:01:02>> Yeah I think uh we have crossed almost
  1377. 1:01:05an hour and I'm in the airport. So uh
  1378. 1:01:08you know please help me with some
  1379. 1:01:10>> asked one or two questions. Uh Mr. Sh I
  1380. 1:01:12think you know after that we can close
  1381. 1:01:14the
  1382. 1:01:14>> please sir.
  1383. 1:01:15>> Yes we'll take one or two questions from
  1384. 1:01:17chat Q&A box then we'll conclude the
  1385. 1:01:20session. So we have one question from
  1386. 1:01:22Mr. Vishar Ma. What were the revenues
  1387. 1:01:25and packed for March 26? What sort of
  1388. 1:01:28growth are we expecting for financial
  1389. 1:01:30year 27 and 28 in terms of revenue Aida
  1390. 1:01:33going forward?
  1391. 1:01:37uh 14 145 and uh 34
  1392. 1:01:42uh and then uh for uh
  1393. 1:01:47for uh 26 27 it'll be 247 and I don't
  1394. 1:01:52want to comment on the numbers right now
  1395. 1:01:54for the next year. Okay. So next
  1396. 1:01:57question please.
  1397. 1:01:59>> Yes. So next question we have from again
  1398. 1:02:02Shah Ma only. How is the spring division
  1399. 1:02:04growing?
  1400. 1:02:08Uh I lost you in between. Can you please
  1401. 1:02:10repeat the question?
  1402. 1:02:12>> Yes, we have again one question from Mr.
  1403. 1:02:15Vishal Ma. How is the spring division
  1404. 1:02:18growing?
  1405. 1:02:19>> Uh the spring division which we uh
  1406. 1:02:22acquired last year. Uh this is uh all
  1407. 1:02:25the springs in the defense sector which
  1408. 1:02:27we are making for the recoil springs.
  1409. 1:02:29They're all in trials in Israel as well
  1410. 1:02:31as ordinance factories in India.
  1411. 1:02:33Presently a very small uh business which
  1412. 1:02:36we are doing for the automotive sector
  1413. 1:02:39but uh this will reflect in numbers only
  1414. 1:02:42in uh 26 27
  1415. 1:02:46>> and thank you sir.
  1416. 1:02:49>> Can we take one last question then we
  1417. 1:02:51come to the session?
  1418. 1:02:52>> Yes.
  1419. 1:02:52>> Okay. So there is an anomalous question
  1420. 1:02:54that if there was impact of Gulf War on
  1421. 1:02:57your sales operations and how do you
  1422. 1:02:59make sure you are insulated from such
  1423. 1:03:02things in future?
  1424. 1:03:04>> Uh the projects which we are presently
  1425. 1:03:07working are not only dependent on the
  1426. 1:03:10Gulf uh situation. See this is the
  1427. 1:03:14reason uh we are in multiple sectors.
  1428. 1:03:16Rail sector is always an ever evergreen.
  1429. 1:03:19uh aerospace and defense is uh you know
  1430. 1:03:22even though the defense sector is
  1431. 1:03:24growing in India uh and across the world
  1432. 1:03:28this uh um the the conditions in Europe
  1433. 1:03:33as well as uh in the border situation it
  1434. 1:03:36is going to be there for a longer time
  1435. 1:03:38and defense is going to be uh the sector
  1436. 1:03:41is going to grow uh it will not uh come
  1437. 1:03:45down in the you know in the near future.
  1438. 1:03:49future but it will open up uh bigger
  1439. 1:03:51avenues bigger markets for us uh for the
  1440. 1:03:54exports. Uh coming back to how we are
  1441. 1:03:58going to sustain this uh numbers and uh
  1442. 1:04:03thing is uh there are projects which we
  1443. 1:04:06have been working for you know last 6 to
  1444. 1:04:088 months already and this will get
  1445. 1:04:10converted into orders now. So, so you
  1446. 1:04:13know continuing you know it is not
  1447. 1:04:15dependent on this Gulf War alone. You
  1448. 1:04:17know if Gulf War stops also we have
  1449. 1:04:20enough projects to work on.
  1450. 1:04:24>> Thank you so much Sidas for answering
  1451. 1:04:26the questions and I think we have
  1452. 1:04:28covered majority of the questions. So
  1453. 1:04:30participants I request you all if you
  1454. 1:04:33have any questions any concern kindly
  1455. 1:04:35please reach out to us at corporate
  1456. 1:04:37access at the corporate.com
  1457. 1:04:42okay and thank you sir for giving your
  1458. 1:04:45time and participation and thank you sir
  1459. 1:04:48for mentoring this session.
  1460. 1:04:51>> Thank you very much madam
  1461. 1:04:52>> I think it was a pleasure to hear you
  1462. 1:04:53and Mr. Madu you also thank you
  1463. 1:04:56>> thank you sir for joining yeah a sir if
  1464. 1:04:59you have to be in Bangalore please visit
  1465. 1:05:02our factory
  1466. 1:05:02>> definitely I will definitely get in
  1467. 1:05:04touch and we'll definitely catch up
  1468. 1:05:06thank you sir thank you very much sir
  1469. 1:05:07you have a nice day
  1470. 1:05:08>> thank you all thank you sir thank you
  1471. 1:05:11bye sir bye

About this transcript

This page contains the full transcript of Millworks Technologies Limited – InveSt★r Conclave | Investor Connect Summit 2026 by Kirin Advisors, generated from the public captions YouTube serves with the video. The transcript has 10,265 words across 1,471 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.