  1. 0:00Present order book, what we see is
  2. 0:02number one will be in the defense sector
  3. 0:05and
  4. 0:06most of the businesses are coming from
  5. 0:08our export customers in Israel as well
  6. 0:11as some of the customers in Europe. So
  7. 0:13this is going to be the number one
  8. 0:16business as we go in
  9. 0:1826 27 and 27 28. The order books are
  10. 0:22phenomenal and new inquiries are being
  11. 0:25generated here.
  12. 0:32>> WELCOME TO SUNDAY INVESTING AND THIS is
  13. 0:34our 42nd episode of Know Your Promoter
  14. 0:36series. And today we have Mr. Sridhar
  15. 0:39Acharya with us, the MD of Milworks
  16. 0:42Technologies Limited. So how are you?
  17. 0:45>> I'm doing well, Tanmay. Thank you for
  18. 0:47inviting for this talk.
  19. 0:49>> So you know, before starting on the
  20. 0:51business, you know, I saw a company was
  21. 0:53incorporated in 2021. So
  22. 0:56I am looking at your financial. So from
  23. 0:58where did this idea came that you know,
  24. 1:01I want to start into precision
  25. 1:03engineering for all defense, aerospace
  26. 1:05and railways thing. What is your
  27. 1:06background and how do you enter into
  28. 1:08this business?
  29. 1:10>> Tanmay,
  30. 1:12in fact,
  31. 1:13myself and Madhu, who is also a
  32. 1:15co-promoter, we actually met in way back
  33. 1:18in 2015. At that point of time, we felt
  34. 1:21that you know, we will jump into this
  35. 1:23entrepreneurial mode. So we got together
  36. 1:26and acquired this V3 Technologies based
  37. 1:29out of Bangalore. We had only five CNC
  38. 1:31machines. As we were growing over the
  39. 1:34period of years organically, we felt
  40. 1:36that it was time that we convert this
  41. 1:38company into private limited. You know,
  42. 1:41so in 2021, you know, we applied for the
  43. 1:44ROC for the name and V3 name was not
  44. 1:46available. So we had to coin this new
  45. 1:48company, Milworks Technologies Limited.
  46. 1:51So basically the company,
  47. 1:54you know, uh, the formation of uh, a
  48. 1:57private limited company happened only in
  49. 1:592021.
  50. 2:01So, uh, you know, as a passion for
  51. 2:03myself and Madhu, you know, we have
  52. 2:05been, uh, mechanical engineers for more
  53. 2:07than 25 years in this field. So, uh, our
  54. 2:11machining and, you know, our shop floor
  55. 2:13experience brought us, you know, let us
  56. 2:15get into this entrepreneurial spirit.
  57. 2:18And, uh, every opportunity which we got
  58. 2:21in terms of manufacturing over the
  59. 2:23period of years, we have taken risk and
  60. 2:25move forward. So, if you see from 2021
  61. 2:29to now, you know, we have been growing
  62. 2:31organically, you know,
  63. 2:33uh, initially with, uh,
  64. 2:35new CNC machines, you know, with two
  65. 2:37machines, four machines added year on
  66. 2:39year. And then, in, uh, you know,
  67. 2:42uh, in 2022, we added our second plant.
  68. 2:45And, uh, 2024, we added our third plant.
  69. 2:48And then, 2025, our fourth plant. So,
  70. 2:51the growth has been phenomenal. And
  71. 2:53based on the market requirements and the
  72. 2:56existing customers who have been, uh,
  73. 2:59you know, uh, encouraging us to grow to
  74. 3:02the next level. So, the existing
  75. 3:04customers, you know, kept on, uh, you
  76. 3:06know, giving us new inquiries, new
  77. 3:08orders,
  78. 3:09uh, volume increase. And, uh, you know,
  79. 3:11we have been delivering a quality
  80. 3:13product with the
  81. 3:14uh, you know, with an on-time delivery
  82. 3:17performance. So, again, repeat orders
  83. 3:20keep coming in, uh, with this, uh,
  84. 3:23with this nature.
  85. 3:26>> Got it. So, before jumping on the
  86. 3:28segments of the business, the name
  87. 3:29Millworks, what is the,
  88. 3:31uh, you know, thesis of this name?
  89. 3:33>> Uh, milling is one of the basic
  90. 3:35operation, uh, of a machining. Uh,
  91. 3:38turning, turning is one of the operation
  92. 3:40which, uh, is also a part of the mini
  93. 3:43machining. So, what happened was, uh,
  94. 3:46coining the Millworks, you know, we had
  95. 3:48to, you know, uh, we have more of
  96. 3:50milling activities. And more milling is
  97. 3:52a complex
  98. 3:53uh, machining process with three axis,
  99. 3:55four axis, and five axis. So, we use we
  100. 3:58coined this word and you know you know
  101. 4:01you see the you know we have been lucky
  102. 4:03that the brand has been taken that to
  103. 4:06the national and international level
  104. 4:08now.
  105. 4:09>> Got it. So, now jumping on the four
  106. 4:11segments of your business, one you do is
  107. 4:13aerospace, second you do is defense,
  108. 4:15third you do is railways, and fourth you
  109. 4:17do is semiconductor. So, can you
  110. 4:18elaborate on four of these segments?
  111. 4:22>> Uh yeah. You first I will talk about the
  112. 4:25defense sector of business. We have been
  113. 4:27working with uh
  114. 4:29uh the defense companies India. And we
  115. 4:32have more than 12 companies in defense
  116. 4:35sector in a base out of Israel. So, the
  117. 4:38defense sector growth we are seeing in
  118. 4:40last 2 years significantly very high.
  119. 4:43And the inquiries which we receive and
  120. 4:47then converting get into orders and
  121. 4:49delivering them. So, we feel that
  122. 4:52we are in the right time at the you know
  123. 4:54right
  124. 4:55sector. And the growth has been very
  125. 4:57phenomenal.
  126. 4:58Over the period of time, you know, we
  127. 5:00also see the saw the drone sector also
  128. 5:03growing in uh electronic warfare and
  129. 5:08you know these type of
  130. 5:10newer this thing we have wanted to be a
  131. 5:13part of this journey. So, in last 1 year
  132. 5:16we felt that you know the drone sector
  133. 5:18we had to be because we had uh
  134. 5:20experience in the machining of the drone
  135. 5:22components. Either a BLDC part or a
  136. 5:25machining a composite part or a plastic
  137. 5:28or a 3D dimensional you know 3D printed
  138. 5:30parts. So, we had experience in these
  139. 5:33areas. So, why not look out for a
  140. 5:35company where we can add value
  141. 5:38you know join them and and build I know
  142. 5:42a complete drone. So, this is where you
  143. 5:44know we made a small investment in the
  144. 5:46defense sector.
  145. 5:48And we have been growing at much faster,
  146. 5:53I know, 2x, 3x year-on-year with the
  147. 5:55defense sector. So, we are going to grow
  148. 5:58this sector in the future,
  149. 6:01you know, in the coming days. Coming to
  150. 6:03the aerospace sector, in the aerospace
  151. 6:05sector, we work with like sector
  152. 6:07companies in India. Also, as a tier two
  153. 6:11companies to the aerospace sector in
  154. 6:15India as well as in Europe. So, this
  155. 6:18also has been growing
  156. 6:21at a much faster rate. Here, the
  157. 6:23precisions are very high precision
  158. 6:26components requirement. At this point,
  159. 6:31we do not have a controlled atmosphere
  160. 6:33facility. And
  161. 6:36you know, we are building up, you know,
  162. 6:38controlled atmosphere, that is
  163. 6:40air-conditioned plant with new machines
  164. 6:42coming in. So, aerospace sector requires
  165. 6:46you know,
  166. 6:47controlled atmosphere to machine
  167. 6:50components up to 2 microns to 5 microns.
  168. 6:53Presently, we are working between 10 to
  169. 6:5515 microns without an air-conditioning
  170. 6:57facility.
  171. 6:59The third sector is the rail sector,
  172. 7:01which has been our bread and butter for
  173. 7:03over the period of years. So, we have
  174. 7:05been working with the multinational
  175. 7:07companies, OEMs
  176. 7:09in India and Europe. In the rail sector,
  177. 7:12we have been exporting to almost 12
  178. 7:14countries in Europe, US and Canada.
  179. 7:18So, the components which we are making
  180. 7:21goes into the braking systems, couplers,
  181. 7:25the door parts, the pantographs,
  182. 7:28actuators, you know, all these parts go
  183. 7:30into a
  184. 7:32critical
  185. 7:33you know, critical assembly of train.
  186. 7:38Either it's a metro train or you know,
  187. 7:42of those long-distance trains.
  188. 7:47So, we are proud to be, you know, in
  189. 7:49India and abroad, whether it's, you
  190. 7:50know, in Europe our parts are there in
  191. 7:53most of the,
  192. 7:55I know, most of the trains. So, rail
  193. 7:59sector is going to be There will be a
  194. 8:02growth, you know, in the coming days. We
  195. 8:04see that this sector growth will also uh
  196. 8:09uh you know, it's part of our
  197. 8:12Government of India's Atmanirbhar uh
  198. 8:14this thing. You can see now the
  199. 8:16high-speed train coming in. We are part
  200. 8:18of this
  201. 8:19uh
  202. 8:20you know, developing parts for the
  203. 8:22high-speed trains. Or, you know, we are
  204. 8:25going to We are part of this Vande
  205. 8:26Bharat or Amrit Bharat Express. So, our
  206. 8:28components are going into these trains.
  207. 8:31So, this will also grow. The last sector
  208. 8:34what we see is the semiconductor
  209. 8:36machinery. So, I want to clarify over
  210. 8:38here our parts go into the semiconductor
  211. 8:41machines, you know, the machines which
  212. 8:43is used to build the chips or any of
  213. 8:46those. So, we are We don't make uh we
  214. 8:49are not directly part of any
  215. 8:50semiconductor industry, but the machines
  216. 8:52which goes into the semiconductor
  217. 8:54manufacturing. So, our parts which are
  218. 8:56the frames and, you know, machine
  219. 8:58components and all these type of parts
  220. 9:00go into
  221. 9:02uh the people who are manufacturing
  222. 9:04machines for the semiconductor industry.
  223. 9:06So, this is the four verticals which we
  224. 9:09are presently working. The
  225. 9:11uh you know, the top notch what we are
  226. 9:13seeing in the growth factor
  227. 9:15uh year on year, 100x, you know, 1x, 2x,
  228. 9:18you know, we'll be You'll be seeing that
  229. 9:20more in in the defense sector.
  230. 9:23>> Got it. So, I was also seeing your
  231. 9:26revenue bifurcation per sector and that
  232. 9:27has been fairly volatile, you know, uh
  233. 9:30FY 25 so semiconductor being a decently
  234. 9:32large portion and which has came down
  235. 9:33and also defense has now scaled up. So,
  236. 9:36uh how do you see this revenue mix uh
  237. 9:39going forward?
  238. 9:41>> Uh present order book what we see is
  239. 9:44number one will be in the defense sector
  240. 9:47and
  241. 9:48most of the businesses are coming from
  242. 9:50our export customers in Israel as well
  243. 9:53as some of the customers in Europe. So,
  244. 9:55this is going to be the number one
  245. 9:58business as we go in
  246. 10:0026 27 and 27 28. The order books are
  247. 10:04phenomenal and new inquiries are being
  248. 10:07generated here. The second thing is uh
  249. 10:10the aerospace sector itself. So, we have
  250. 10:13been selected as part of
  251. 10:17you know, once I know part of some of
  252. 10:20the important projects in France as well
  253. 10:22as in Germany. So, this will also grow.
  254. 10:26Uh
  255. 10:26rail sector growth you will see I know
  256. 10:30you will not see a significant growth
  257. 10:32but it will grow. Semiconductor being a
  258. 10:35part of a machinery business, it will
  259. 10:37remain more or less in the same
  260. 10:38percentage. You will not see that much
  261. 10:40growth
  262. 10:41uh numbers coming in in the
  263. 10:42semiconductor machinery business.
  264. 10:46>> So, so we can you know, sort of an
  265. 10:47assume that 50 to 60% is sort of a
  266. 10:50revenue I know bifurcation should be
  267. 10:53towards the defense and around 20 30% on
  268. 10:55the aerospace and rest 20 20% on railway
  269. 10:58plus semiconductor if I'm getting it
  270. 10:59correct.
  271. 11:01>> Exactly. Semiconductor will be in the
  272. 11:03single digit.
  273. 11:04Defense sector will be 50 plus.
  274. 11:06Aerospace will be between 25 to 30 and
  275. 11:09around 15 to 20% will be in the rail
  276. 11:11sector.
  277. 11:13>> Got it.
  278. 11:14Uh sir,
  279. 11:16I was seeing your financials you know,
  280. 11:17so the trade receivables which I saw
  281. 11:20have been fairly spiked up. So, like
  282. 11:23around 6 7 months of receivable we are
  283. 11:25standing and there is a logical reason
  284. 11:27which I feel
  285. 11:29is that two billing for our company is
  286. 11:31about 70 or percent or 80% of the
  287. 11:34revenue
  288. 11:35which whose billings get generated the
  289. 11:38cash flow comes in in the H1 of the next
  290. 11:39financial. So, this H1 FY27. Is my
  291. 11:42understanding correct and
  292. 11:43what steps are we taking forward to
  293. 11:46either reduce or manage this stretch
  294. 11:48working capital cycle?
  295. 11:51>> Uh the Tanmay initially when we moved
  296. 11:54into the sub-assemblies and assemblies
  297. 11:56and project management business, there's
  298. 11:59a calculated risk which we have taken
  299. 12:03where in which
  300. 12:04a large portion of the business will be
  301. 12:07delivered on the completion of
  302. 12:10the orders.
  303. 12:11If you take
  304. 12:13our drone business itself, we work with
  305. 12:16the government of India's Ministry of
  306. 12:18Defense. Where in which the government
  307. 12:20doesn't give us any advance payments or
  308. 12:23anything, you know, 50-60 crores you
  309. 12:25know, in a small project itself
  310. 12:28is being paid only on delivery. And this
  311. 12:31projects normally go between 8 to 10
  312. 12:33months. So, a lot of working capital
  313. 12:35gets stuck over here
  314. 12:37and this is one
  315. 12:39one of the reason and why the
  316. 12:42receivables are very high in this year
  317. 12:45is we made a large amount of billing in
  318. 12:48the month of March for the
  319. 12:52for the quick pay and in turn they are
  320. 12:54now billing into the MOD. So, a large
  321. 12:57amount of money is expected month end
  322. 13:01and in the first week of
  323. 13:04August. And coming to our
  324. 13:07Israel and European customers, we had a
  325. 13:1090 to 120 days credit lines with them.
  326. 13:14With the volatility and the uncertainty
  327. 13:17what we are seeing in Europe right now,
  328. 13:20all the shipping lines most of the most
  329. 13:22of the products which we are shipping
  330. 13:24them they go in containers. These
  331. 13:26containers on the ocean shipment,
  332. 13:28they're all getting stuck in different
  333. 13:30places, either in Colombo port or in
  334. 13:33Haifa port or you know, different places
  335. 13:35of
  336. 13:37it is getting stuck and not getting
  337. 13:39delivered. So,
  338. 13:41you will you see that you know, our
  339. 13:43receivables
  340. 13:45are getting more delayed because the
  341. 13:48components are not delivered to the
  342. 13:50customer end.
  343. 13:51So, what we do we did is we cannot work
  344. 13:55in this way. So, we went back to our
  345. 13:57customers basically in Europe and uh
  346. 14:00uh
  347. 14:00in Israel and we asked them, we
  348. 14:02requested them you see
  349. 14:04our working capital requirements are
  350. 14:06getting stuck. Why don't you help us
  351. 14:08with advanced payments?
  352. 14:10So, April onwards in this current year,
  353. 14:13all orders which we are receiving from
  354. 14:15Israel, we are getting a 30% advanced
  355. 14:18payments. So,
  356. 14:21so our cash flow will be much better and
  357. 14:24we need not wait for the deliverables.
  358. 14:27Also,
  359. 14:28we made it mandatory this you know, that
  360. 14:31we make it
  361. 14:33all the parts going into Israel are
  362. 14:35being airlifted. It is not going by
  363. 14:37ocean ship. We don't want to make it
  364. 14:39even though all our business is
  365. 14:41ex-works. We you know, it's from the
  366. 14:43date of invoicing. We don't take care of
  367. 14:46the logistics you know, the logistics on
  368. 14:49the exports is all ex-works. So, it's up
  369. 14:52to them to take it by
  370. 14:54ocean or by air. So, now we have made it
  371. 14:57a mandatory that you know, our money
  372. 14:59also doesn't get locked in so that
  373. 15:03you know, we requested our customers
  374. 15:06to airlift all those components and make
  375. 15:09our payment you know, within our time 60
  376. 15:12or 90 days. So, this is one part. The
  377. 15:15second part is we are unable to make any
  378. 15:19uh uh, you know, cash flow improvements
  379. 15:22on any of our government of India's uh
  380. 15:24uh
  381. 15:25projects, MOD's or MOD projects or
  382. 15:27BrahMos projects, you know, they uh, you
  383. 15:30know, our money is going to
  384. 15:33get stuck here for 6 to 8 months on the
  385. 15:36projects. Whether it is drones or the
  386. 15:38missile systems for the BrahMos, these
  387. 15:40are all project-based uh things where
  388. 15:43more than getting money, we are supposed
  389. 15:45to give advance bank guarantees, you
  390. 15:47know, bank guarantees. 10% of the tender
  391. 15:50money is also getting stuck over there.
  392. 15:53Uh, this is a system which we have to
  393. 15:54live in and we have to work on
  394. 15:58higher margins and uh work out on the
  395. 16:00inventory carrying costs. Uh, you build
  396. 16:03that in in the product costing itself.
  397. 16:06So, this is how we are going to work
  398. 16:08with all the projects which we are going
  399. 16:10to work with the government of India.
  400. 16:13>> That gives a lot of clarity and actually
  401. 16:15my next question was supposed to be on
  402. 16:16the BGs and you have, you know, fairly
  403. 16:18touched upon the point.
  404. 16:19Uh
  405. 16:20I was also looking the numbers, the
  406. 16:22difference between your DRHP and RHP
  407. 16:24numbers. The 2 months numbers have been
  408. 16:26around the 40% of your combined revenue.
  409. 16:29So,
  410. 16:30uh so, like I I assume H1 end of FY27 or
  411. 16:33very early H2, we should see the
  412. 16:35payments and cash flows coming in. But,
  413. 16:37uh I feel it is fair to assume there is
  414. 16:39no sort of any worry on the uh money
  415. 16:41getting stuck beyond the limit is what
  416. 16:43is fair to assume, right?
  417. 16:44>> Yeah. Yeah, you know, so, uh you know,
  418. 16:47the major portion portion of this money
  419. 16:49right now is uh
  420. 16:51uh more than 50% or more than 60% of
  421. 16:54this money receivables is stuck with the
  422. 16:55government of India MOD's uh this thing.
  423. 16:58And uh that will get closed because this
  424. 17:00is one project, you know, which got uh
  425. 17:04uh the money got stuck over here. Uh as
  426. 17:07part of the all the Israeli customers,
  427. 17:10you know, all the funds are all flowing,
  428. 17:12you know, in last 1 1 and 1/2 months,
  429. 17:14funds are flowing fairly well.
  430. 17:19>> All right. Uh
  431. 17:19>> also coming on this you know I was
  432. 17:21seeing
  433. 17:23there is a concern among you know
  434. 17:24there's a company called as Quickpay
  435. 17:26from which we you derive around the 47%
  436. 17:29revenue and so so what is this sort of
  437. 17:31an arrangement with this company?
  438. 17:34>> What we did was as I mentioned earlier
  439. 17:37Quickpay is a drone manufacturing
  440. 17:39company based out of Noida. Presently
  441. 17:43they are working on a 190 sets of
  442. 17:46loitering munition order from the
  443. 17:48artillery division of uh
  444. 17:50uh
  445. 17:51government of India MOD's order. So when
  446. 17:55we were looking out for strategic
  447. 17:57investments and looking out for to be in
  448. 17:59the defense sector area we found that
  449. 18:02you know uh
  450. 18:04as part of this thing you know we could
  451. 18:07help them we could help Quickpay
  452. 18:11quickly deliver uh
  453. 18:13uh you know the drones which they
  454. 18:14already have an order. So
  455. 18:18the skill sets of Milworks and Quickpay
  456. 18:22they match together to form a team. And
  457. 18:26Milworks is really good in machining you
  458. 18:28know of important components either in
  459. 18:32composites or
  460. 18:34aluminum parts which goes into this
  461. 18:36drone.
  462. 18:37Uh there are some smaller electronic
  463. 18:40modules like battery management systems
  464. 18:44or the autopilot Well we gained this
  465. 18:47over the period of time we built this
  466. 18:49capability to build our own in-house uh
  467. 18:53uh
  468. 18:54battery management system or
  469. 18:56the autopilots. So we helped build
  470. 19:00you know the drones for
  471. 19:03Quickpay with
  472. 19:04the engineering support and you know the
  473. 19:06prototypes and in last eight months we
  474. 19:09worked on this.
  475. 19:11As part of the strategic investment, we
  476. 19:13also hold small minority stake in
  477. 19:16QuickPay Limited. Uh
  478. 19:19so, you know, we are going to work on
  479. 19:22along with them in a long-term
  480. 19:24perspective building uh
  481. 19:27you know, engine-based
  482. 19:28uh drones,
  483. 19:30high-end drones, you know, combining our
  484. 19:32capability as well as their capability.
  485. 19:36Uh QuickPay is very strong in uh the
  486. 19:39software part of uh the drone. Uh either
  487. 19:43building a logic or
  488. 19:46you know, building all the systems which
  489. 19:48is required into the
  490. 19:51you know, electronic warfare system.
  491. 19:53Presently, the entire defense industry
  492. 19:55is working on a EW warfare. So, QuickPay
  493. 19:58is really good in uh
  494. 20:01you know, building this into the drone
  495. 20:03system. And this has been proven, you
  496. 20:05know, again and again with more and more
  497. 20:07product lines which we have which they
  498. 20:09have already built. Uh the facility in
  499. 20:13Noida is
  500. 20:14uh the Ministry of Defense uh
  501. 20:17uh approved license is there available
  502. 20:19and then they have been building this
  503. 20:21for some time now.
  504. 20:22And uh
  505. 20:24uh there is a large project which they
  506. 20:26are delivering a later part of this uh
  507. 20:29month wherein which uh
  508. 20:30from the component level, sub-assembly
  509. 20:33level, and
  510. 20:35uh you know, on the product level, we
  511. 20:36have supported them. And uh in the month
  512. 20:39of March, we we made uh you know, we
  513. 20:42made all these assemblies and
  514. 20:44sub-assemblies and delivered them in the
  515. 20:47month of March. So, now they are ready
  516. 20:49to deliver and
  517. 20:51uh the MOD is presently at this moment
  518. 20:54is uh inspecting all those components
  519. 20:57before dispatch.
  520. 20:59>> So, actually I was reading about
  521. 21:00QuickPay, you know, in the ROC. And I'm
  522. 21:03assuming the details won't be, you know,
  523. 21:04that great with me, but
  524. 21:06you know, whatever details I could look
  525. 21:08at currently it is a fairly small
  526. 21:10company and obviously with this audit
  527. 21:12should go big but
  528. 21:15do you feel the company is fairly
  529. 21:16capitalized on one part and second part
  530. 21:18of this would be obviously they are not
  531. 21:21going to pre-pay you. They are going to
  532. 21:23pay you after they receive the cash flow
  533. 21:25from MOD.
  534. 21:26That actually you know, spikes up the
  535. 21:29entire working at WC for you because you
  536. 21:32know, I am assuming the payment should
  537. 21:34be around 10 9 to 12 because that they
  538. 21:36should receive in about 6 to 8 months.
  539. 21:38>> So you know, you know, Tanmay what
  540. 21:41happens is being an MSME sector the
  541. 21:45first project or you know, successful
  542. 21:48you know, second or third project when
  543. 21:51large project comes it is always between
  544. 21:54how you manage the business. This is
  545. 21:57where you know, Milworks has come in in
  546. 22:00in terms with an arrangement with
  547. 22:02QuickPay. So
  548. 22:04the way the MOD's tender this thing is
  549. 22:08with them is 60% of the payment is paid
  550. 22:12before dispatch. So you know, this is we
  551. 22:15have an arrangement back-to-back
  552. 22:17payments cycle to be received from
  553. 22:20QuickPay to
  554. 22:22to us. So this project we are helping
  555. 22:26them you know, successfully deliver
  556. 22:28keeping uh
  557. 22:29our own skill sets in place. But going
  558. 22:32further you know,
  559. 22:35we are going to help them in a in a
  560. 22:37slightly different way, you know,
  561. 22:39helping them with their own
  562. 22:42banking you know, banking support either
  563. 22:46in terms of debt or any of those. But we
  564. 22:50will have to support them continuously
  565. 22:53as the next projects are more than you
  566. 22:55know, as large projects. They are more
  567. 22:57than 100 crore projects where they will
  568. 22:59require you know,
  569. 23:02technical assistance in terms of
  570. 23:04mechanical parts or, you know, 3D
  571. 23:06printed parts, you know, such type of
  572. 23:08parts they will require. So, we will
  573. 23:10collaborate with them and work in a
  574. 23:12you know, much better way.
  575. 23:15>> Got it. So, thanks for the clarity
  576. 23:17because I was seeing, you know, our
  577. 23:19company being in the limelight as our
  578. 23:21IPO has been declared, but this is one
  579. 23:23sort of a thing on Quickplay which
  580. 23:25everyone is having a concern and you
  581. 23:26know, I feel this has been pretty well
  582. 23:28answered. Uh
  583. 23:30my next question would be we are on a
  584. 23:32very
  585. 23:33very vast sort of a product portfolio
  586. 23:35and four different segments and fairly
  587. 23:37contributing in the
  588. 23:39So, what do you new segments or sub
  589. 23:41segments you Milworks is expecting 1
  590. 23:44years or 2 years down the line we should
  591. 23:46enter or expand into those?
  592. 23:49>> So, what we what we presently seeing,
  593. 23:53you know, pre-COVID what happened is we
  594. 23:56were very active
  595. 23:58in the rail sector. And then there was a
  596. 24:01Boeing Max scenario came in between '21
  597. 24:05and '22. And if we are there in one
  598. 24:08single segment and working on this,
  599. 24:11there's always,
  600. 24:12you know, the business model dripping,
  601. 24:15you know, going down, you know. So,
  602. 24:18I've seen companies who were who were
  603. 24:21only into aerospace when it came prior
  604. 24:23to
  605. 24:25prior to COVID and just after COVID, you
  606. 24:28know, their revenue decreased. Uh
  607. 24:31but if we see our own this thing, you
  608. 24:33know, during COVID time we actually
  609. 24:35doubled our top line and order bookings
  610. 24:37also we we grew up. So, it is always
  611. 24:40good to be in multiple uh
  612. 24:43uh segments and we intend to be in
  613. 24:46multiple segments. Now, in defense
  614. 24:48sector right now we have been working
  615. 24:51only on the component level business and
  616. 24:53our future is now we want to get into
  617. 24:57assemblies, sub-assemblies. Component is
  618. 25:00going to be there as part of
  619. 25:03you know assembly.
  620. 25:04But there are opportunities where in
  621. 25:06which our customers have come back to
  622. 25:09build in you know fuselage systems or
  623. 25:13large missile carrier systems. Wherein
  624. 25:16which a machine component, sheet metal
  625. 25:18component, bought out items, you do a
  626. 25:20welding or riveting or you know such
  627. 25:23type of plastic critical items. So we
  628. 25:26intend to be you know in that league in
  629. 25:29the defense sector.
  630. 25:31That we intend we have a strategic
  631. 25:33roadmap in place with post IPO
  632. 25:36investments in
  633. 25:38adding new machineries which is part of
  634. 25:40our
  635. 25:42you know investment plan.
  636. 25:45So we will be growing in that sector.
  637. 25:47And coming back to the aerospace sector,
  638. 25:50we feel that presently many of
  639. 25:53the parts which we are supplying we are
  640. 25:55on the tier two for the top notch
  641. 25:58aerospace companies either in France or
  642. 26:00in the US. So our intention is when we
  643. 26:04put up a controlled atmosphere facility,
  644. 26:07we will now be in the big league to
  645. 26:09supply components, sub-assemblies and
  646. 26:11assemblies to the top aerospace
  647. 26:14companies. So these are the two sectors
  648. 26:17which we will be focusing in next three
  649. 26:19years and growing at will grow at a much
  650. 26:23faster rate.
  651. 26:25>> Got it. And I was also reading about you
  652. 26:28know the supply chain shift happening
  653. 26:29from the US and North European aerospace
  654. 26:32and defense component companies to
  655. 26:34countries like India because I was even
  656. 26:36I read about spirit, you know.
  657. 26:40I would say manpower or labor cost on
  658. 26:43their overall balance sheet has now on
  659. 26:45their P&L has been to about 30-40% odd
  660. 26:47in India which is at about 5-6 4 to 7%
  661. 26:50anywhere between that. So we should just
  662. 26:53be able to assume that lot of supply
  663. 26:54chain shifts are happening even on the
  664. 26:57commercial aerospace but obviously
  665. 26:59there are lot more qualifications on
  666. 27:01that end but military as well as
  667. 27:02commercial or that ecosystem is coming
  668. 27:04in India if we 5 years down the line it
  669. 27:06should be pretty large.
  670. 27:09>> I agree with you Tanmay. So, we see that
  671. 27:12you know with the announcement of the
  672. 27:14IPO itself we are seeing that newer
  673. 27:17companies are also coming in
  674. 27:20but as of now we are not geared up for
  675. 27:23deliverables because we need to build up
  676. 27:25the infrastructure. It will take 6 to 8
  677. 27:28months and post that you know we can you
  678. 27:31know we can focus on the new inquiries
  679. 27:33coming in.
  680. 27:35>> Any any sort of
  681. 27:37you know
  682. 27:39we are we are expecting to go into
  683. 27:40commercial aerospace components as well?
  684. 27:43>> We are presently doing for couple of US
  685. 27:47customers on the commercial side
  686. 27:50but again they're all on tier two. Now,
  687. 27:53what is happening here is
  688. 27:56you know as we move forward it we
  689. 27:59it is always good to have a strategic
  690. 28:01tie-up with a good
  691. 28:03you know good OEMs
  692. 28:06on developing some of the key components
  693. 28:09and then
  694. 28:11grow in that segment. You know I I want
  695. 28:13to I want to give an example like you
  696. 28:15know Azad Engineering has been really
  697. 28:18good you know I see them you know
  698. 28:20they make
  699. 28:22the blades for the engines you know
  700. 28:24which is
  701. 28:25which is not everyone can do it and they
  702. 28:28have specialized over the period of time
  703. 28:30and then either it's a turbine blade or
  704. 28:32an engine blade they have top notch
  705. 28:35you know and the customers
  706. 28:37across the world you know across the
  707. 28:39world across the competition you know
  708. 28:42they come for the product
  709. 28:45them. So, we intend to follow you know,
  710. 28:48some of the learnings and
  711. 28:54specialized and not to be, I mean, you
  712. 28:57know, some of the
  713. 28:59sector itself.
  714. 29:01>> Got it, sir. Before letting you go, I
  715. 29:03know I would wish, I know, wish you all
  716. 29:06the best for your IPO and I'm expecting
  717. 29:09a blockbuster debut.
  718. 29:11So, like uh my last question would be
  719. 29:14what sort of a growth prospects do you
  720. 29:16expect going forward because I'm seeing
  721. 29:19that two things. First is that past
  722. 29:20growth has been exponentially
  723. 29:23and the working capital estimates, you
  724. 29:24know, RSP also suggest
  725. 29:27basically even a very high growth on
  726. 29:29even that larger base. So, what sort of
  727. 29:31an expectations investors
  728. 29:33[clears throat] coming forward on the
  729. 29:34capital should expect?
  730. 29:37>> So, what I am presently seeing here is
  731. 29:42next to two years we intend to double
  732. 29:44our top line keeping the bottom line
  733. 29:47same, you know, so
  734. 29:49you know, just by, you know, being in
  735. 29:53these existing
  736. 29:55projects. But, we will we will take a
  737. 29:57risk into new projects, new business
  738. 30:00lines over the period of time. So,
  739. 30:02anyway, thank you very much Tanmay for
  740. 30:04your time.

About this transcript

This page contains the full transcript of Millworks Technologies : Know Your Promoter - Management interaction with Mr. Sridhar Acharya, MD by Sunday Investing, generated from the public captions YouTube serves with the video. The transcript has 4,659 words across 740 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.