- 0:18On July 23rd, 2021,
- 0:21a 66-year-old employee was working for
- 0:24the company as an equipment operator
- 0:26when the incident occurred.
- 0:28On their first day, the employee
- 0:30completed an orientation covering the
- 0:32occupational health and safety
- 0:34management system, including safety
- 0:36rules, rights and responsibilities,
- 0:38hazard management, personal protective
- 0:41equipment, safe work procedures,
- 0:44emergency protocols, and hazard
- 0:46reporting.
- 0:48Employees are expected to assess any new
- 0:50or modified hazards they encounter.
- 0:53The employee reviewed and signed a
- 0:55hazard assessment specific to their role
- 0:57as an equipment operator, addressing
- 0:59hazards like equipment access and
- 1:01material handling.
- 1:03No record exists of a hazard assessment
- 1:05on the day of the incident.
- 1:08On the day of the incident, the employee
- 1:10was tasked by his supervisor to empty
- 1:12material out of bin three and bin four
- 1:14of the plant so that new material could
- 1:16be added.
- 1:18The weather was quite warm that day, 28°
- 1:20C.
- 1:22The task of emptying material from the
- 1:24plant's bins required the employee to
- 1:26push the material toward the small
- 1:28conveyor belt at the bottom of each bin.
- 1:31To carry out this task, the employee
- 1:33climbed a ladder to the top of each bin
- 1:35to be emptied and pushed the material
- 1:37toward the small conveyor at the bottom
- 1:39of each bin using a shovel.
- 1:41As the small conveyor belt moved, it
- 1:44would drop the material onto the larger
- 1:45conveyor belt.
- 1:47The material would then be transported
- 1:49off the end of the larger conveyor belt
- 1:51and into the trailer of a truck being
- 1:53operated by a truck driver and would
- 1:55deliver the materials away from the
- 1:57site.
- 1:58The employee and his supervisor had
- 2:00completed the task of emptying material
- 2:03from the plant's bins on previous
- 2:04occasions. Both the small conveyor belt
- 2:07at the bottom of each bin and larger
- 2:09conveyor belt running the entire length
- 2:11of the plant were energized and moving
- 2:13while the employee was completing this
- 2:15task.
- 2:16While the employee was emptying material
- 2:19from the plant's bins, the supervisor
- 2:21was in the equipment control room at the
- 2:23site. This control room, located near
- 2:26the plant, supplies power to the plant
- 2:28and other site equipment. From there,
- 2:31the supervisor monitored the material as
- 2:33it was transported along the plant's
- 2:35larger conveyor belt.
- 2:37After the employee finished emptying the
- 2:39material from bin four of the plant, his
- 2:41supervisor turned off the small conveyor
- 2:43belt under bin four and turned on the
- 2:45small conveyor belt under bin three so
- 2:48that the employee could begin emptying
- 2:49the material from bin three.
- 2:52Approximately 5 minutes after turning on
- 2:54the small conveyor belt under bin three
- 2:56of the plant, the supervisor noticed
- 2:58that material was no longer running down
- 3:00the larger conveyor belt.
- 3:02The supervisor then left the equipment
- 3:04control room with the plant still
- 3:06running and went to check in with the
- 3:07employee. The supervisor climbed a
- 3:10ladder to reach the top of bin three of
- 3:12the plant, peered into the bin, and saw
- 3:14the employee on his side on the small
- 3:17conveyor belt at the bottom of the bin.
- 3:19The supervisor observed that the
- 3:21employee's upper body, including his
- 3:23head, was covered in material and that
- 3:26his lower body was uncovered with his
- 3:28legs bent. The supervisor ran back to
- 3:30the equipment control room to shut down
- 3:32the plant and called for first aid
- 3:34assistance using the two-way radio in
- 3:36the emergency control room. No one
- 3:38responded to the two-way radio call. The
- 3:41supervisor then went back to the plant
- 3:43and climbed into bin three to extract
- 3:45the employee from the material. The
- 3:48employee was unconscious. The supervisor
- 3:50then ran back to the equipment control
- 3:52room to call 911. He then provided the
- 3:55site address to the 911 operator and
- 3:58asked for an ambulance. The supervisor
- 4:00returned to the plant and verbally
- 4:02called out for help from the top of bin
- 4:04three.
- 4:05Two contractors from a trucking company
- 4:07heard the supervisor's call for help.
- 4:09They went to the plant to meet the
- 4:11supervisor. The supervisor began
- 4:13performing CPR on the employee. The
- 4:16supervisor and the contractor were
- 4:18unable to successfully resuscitate the
- 4:20employee.
- 4:22Another truck driver on site also heard
- 4:24the yelling and calls for help coming
- 4:26from the plant. He ran to the plant and
- 4:28was told to call an ambulance.
- 4:31The employee then went to the main gate
- 4:32of the site so he could get the location
- 4:34of the site for the 911 operator.
- 4:37Shortly after the police and paramedics
- 4:40arrived, the police extracted the
- 4:42employee from bin three of the plant
- 4:44with the aid of the supervisor and the
- 4:45contractor who had remained with the
- 4:48employee inside bin three.
- 4:50Paramedics performed on-site triage once
- 4:53the employee was out of bin three of the
- 4:54plant, but he was soon after declared
- 4:57deceased by the paramedics.
- 4:59Since there were no eyewitnesses that
- 5:01saw how the employee became covered in
- 5:03material in bin three at the time of the
- 5:05incident, the specific circumstances
- 5:08surrounding his death and its exact
- 5:09cause remain unknown.
- 5:12Following the incident, the company
- 5:14implemented a number of corrective
- 5:16actions, including
- 5:18A. Placing decals on each side of the
- 5:21plant's bins stating, "Danger. Do not
- 5:24enter hoppers."
- 5:26B. Installing a catwalk on top of the
- 5:29plant allows safer employee access to
- 5:31materials in the bins, aiming to reduce
- 5:34future safety incidents, though it isn't
- 5:36required by the manufacturer's
- 5:38specifications.
- 5:40C. Installing shaker equipment on the
- 5:43plant, though not required by the
- 5:45manufacturer, it is intended to safely
- 5:48and efficiently move material toward the
- 5:50small conveyor belts at the bin's base.
- 5:53D. Requiring all employees to attend a
- 5:554-hour paid safety reorientation.
- 5:59E. Coaching supervisors on the
- 6:01importance of reviewing each work
- 6:03activity in more detail when conducting
- 6:05hazard assessments and effectively
- 6:07communicating hazard control measures to
- 6:09employees on site.
- 6:11F.
- 6:12Completing an updated hazard assessment
- 6:15for the cold bin feed hopper clean out
- 6:17to change material task, the task the
- 6:19employee was performing during the
- 6:21incident, with supervisor involvement in
- 6:23the assessment process.
- 6:26G.
- 6:27Reviewing and updating safety program
- 6:29materials and safety manuals contained
- 6:31at the site and ensuring supervisors are
- 6:33familiar with their contents and how
- 6:35they can be accessed.
- 6:38As an additional corrective measure, the
- 6:39company installed deflector plates in
- 6:42bins 1, 2, and 3 of the plant to reduce
- 6:45weight on the small conveyor belts.
- 6:47Bin 4 already had deflector plates
- 6:49installed before the incident.
- 6:52These actions show the company's
- 6:53commitment to improving safety and
- 6:55preventing future incidents.
- 6:58Structural upgrades, new equipment,
- 7:00clear signage, and employee training
- 7:03address key risks.
- 7:05Involving supervisors in hazard
- 7:07assessments and updating safety
- 7:08materials further supports a stronger
- 7:11safety culture.
- 7:12Together, these steps help reduce the
- 7:14chance of similar incidents.
About this transcript
This page contains the full transcript of Lessons from the Field - One Step Too Far | Fatal Hopper Incident Re-enacted by Your ACSA Safety, generated from the public captions YouTube serves with the video. The transcript has 1,104 words across 193 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, caption language selection, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.