  1. 0:11In March 2022, the new employee began
  2. 0:14working at the company and completed the
  3. 0:16site safety orientation, health and
  4. 0:18safety orientation, and an online ground
  5. 0:21disturbance awareness course on the
  6. 0:23first morning.
  7. 0:25The new worker was then given a tour of
  8. 0:26the work site and introduced to the
  9. 0:28tasks at hand. The superintendent
  10. 0:31instructed them to observe and learn
  11. 0:33from the other workers over the next few
  12. 0:35days, during which they would also
  13. 0:37explain the hazards and potential pinch
  14. 0:39points. The other worker told him the
  15. 0:41most important thing was to always watch
  16. 0:43for open holes and to make sure they
  17. 0:46were covered and had barricades around
  18. 0:47them. The hazards of falling into open
  19. 0:50holes or excavations were addressed in
  20. 0:52several of the company's safety
  21. 0:54documents. However, there were varying
  22. 0:57procedures followed at the site for
  23. 0:59protecting workers from open holes.
  24. 1:02Utilize hole barricades on holes 24 in
  25. 1:05or larger in diameter. Unattended open
  26. 1:08holes to be covered and marked open hole
  27. 1:10to prevent falls while drilling piles to
  28. 1:13depth. Ensure barricades and warning
  29. 1:16signs are in place to prevent property
  30. 1:18damage while pouring concrete and
  31. 1:20removing casings.
  32. 1:22The project hazard assessment in the
  33. 1:24company's work site safety plan
  34. 1:27identifies open excavations as a
  35. 1:29potential hazard associated with
  36. 1:31drilling. To mitigate this risk, the
  37. 1:34plan requires the installation of guard
  38. 1:36rails with the additional precaution
  39. 1:37that fall protection must be worn if the
  40. 1:40guardrail needs to be removed for any
  41. 1:42operation. The guardrails or handrails
  42. 1:45section of the company's work site
  43. 1:47safety plan states the following. One,
  44. 1:50OS legislation compliant guard rails are
  45. 1:53to be used with excavations.
  46. 1:56Two, all openings must be barricaded and
  47. 1:58be covered with reinforced plywood.
  48. 2:01Three, workers must never leave an
  49. 2:04opening unattended.
  50. 2:06Field level hazard assessments completed
  51. 2:08by site workers and initialed by the new
  52. 2:10worker a few days prior to the incident
  53. 2:13identify open hole as a hazard and stay
  54. 2:16behind the hole barricade as the
  55. 2:18control.
  56. 2:21The driller also completed and signed a
  57. 2:23foreman safety meeting record on the day
  58. 2:25of the incident 5 hours after the
  59. 2:27incident. The document lists, "Put
  60. 2:31plywood down to cover holes as both a
  61. 2:33task to be done and a hazard control."
  62. 2:36The rest of the crew, including the new
  63. 2:38worker, are shown as having either
  64. 2:40signed or initialed the document between
  65. 2:4212:32 p.m. and 12:38 p.m., approximately
  66. 2:465 hours after the incident.
  67. 2:49On the day of the incident, the employee
  68. 2:51arrived at work at approximately 7 a.m.
  69. 2:54and was assigned to assist an employee
  70. 2:56driller. This was their first time
  71. 2:58working together. The new employee was
  72. 3:01replacing the laborer who was not at
  73. 3:03work that day and was usually assigned
  74. 3:05to the driller. This was the new
  75. 3:07employees sixth day of work for the
  76. 3:09company. While it was standard practice
  77. 3:12for the workers to have a safety meeting
  78. 3:13first thing in the morning, they did not
  79. 3:15have one the morning of the incident.
  80. 3:18The new worker opened the CCAN and began
  81. 3:20removing materials. He then went to see
  82. 3:23the other driller to get some diesel
  83. 3:24exhaust fluid for his coworker's drill
  84. 3:26rig. The driller then moved the rig from
  85. 3:30over top of the hole where he had parked
  86. 3:32it when they finished work the previous
  87. 3:33Friday and went to get the skid steer to
  88. 3:36remove the plywood and backfill the
  89. 3:38hole. This exposed the plywood covering
  90. 3:41the hole. The driller says as he was
  91. 3:43walking to the skid steer, he told the
  92. 3:45new worker to watch out for holes. The
  93. 3:48driller says the new worker had no tasks
  94. 3:50assigned to him that morning, and he
  95. 3:52does not know why they went to lift the
  96. 3:54plywood.
  97. 3:55The company states that there was only
  98. 3:57one open hole on site, being the one
  99. 4:00with the parked over top of it. No new
  100. 4:03holes had been drilled that morning. The
  101. 4:06new worker said the driller asked him to
  102. 4:07get a piece of wood to cover a newly
  103. 4:09drilled hole. He saw the piece of
  104. 4:12plywood laying on the ground and says he
  105. 4:14did not realize it was covering an open
  106. 4:16hole. there was no barrier around it and
  107. 4:19nothing on top of it. He says there was
  108. 4:21a light layer of snow on the ground and
  109. 4:24the plywood and that he could not see
  110. 4:26the orange paint on it. The new worker
  111. 4:29was present when they dug the hole on
  112. 4:30Friday, but by Monday he had forgotten
  113. 4:33about it. He says that since he was not
  114. 4:36operating the skid steer, he did not
  115. 4:38know which holes were filled in on
  116. 4:39Friday. He would have known the hole was
  117. 4:42there if it had a barricade around it or
  118. 4:44something on top of the plywood.
  119. 4:47The new worker bent down and grabbed the
  120. 4:49plywood with both hands. And as he stood
  121. 4:51up, he took a step forward and fell into
  122. 4:53the hole.
  123. 4:56He landed on the rebar cage and concrete
  124. 4:58pile 7 m below. EMS was called and
  125. 5:02arrived within 10 or 15 minutes. They
  126. 5:04lowered a harness to the employee and
  127. 5:06pulled him out of the hole. He was
  128. 5:08transported to the hospital by ambulance
  129. 5:10within 30 or 40 minutes of his fall. The
  130. 5:14employee suffered permanent lifealtering
  131. 5:16injuries. He also suffers related mental
  132. 5:19health issues. He spent several weeks in
  133. 5:22the hospital and is still receiving
  134. 5:23regular medical care. He is in constant
  135. 5:26pain and his prognosis is uncertain as
  136. 5:29it relates to his ability to work in the
  137. 5:31future.
  138. 5:32A few days after the incident, the
  139. 5:35company revised its pile and
  140. 5:36foundational drilling procedure to
  141. 5:38include the following rules among
  142. 5:40others.
  143. 5:41No one should come within 1.8 m 6 ft of
  144. 5:45a hole's edge during or after drilling
  145. 5:48unless they are directly involved in the
  146. 5:49operation. Workers involved must also
  147. 5:52stay 1.8 m away from the edge of a
  148. 5:55drilled hole or queson unless it has a
  149. 5:58liner extending at least 1 meter above
  150. 6:00the ground. If the liner is not present,
  151. 6:03workers must be protected from falling
  152. 6:05by using a fall protection system or a
  153. 6:07guardrail around the hole. Fall
  154. 6:09protection systems shall be anchored to
  155. 6:11a Lego block and be used as fall
  156. 6:14restriction systems. This will apply for
  157. 6:16holes that are larger than 30 in in
  158. 6:19diameter. A retractable lanyard will be
  159. 6:22used with the anchor placed at a
  160. 6:23distance that does not allow for a fall
  161. 6:25into an open hole to occur. Holes that
  162. 6:28are 30 in or greater and cannot be
  163. 6:30backfilled immediately will have a 5tx 5
  164. 6:33ft/2in steel plate placed over the open
  165. 6:36hole. If the hole is greater than 46 in,
  166. 6:40the plate will be adjusted to ensure 1
  167. 6:42ft of overlap.
  168. 6:44Prior to removal, guardrails will be
  169. 6:46placed around the hole. A skid steer
  170. 6:49will remove the plate with a spotter 7
  171. 6:51ft away from the hole to ensure that
  172. 6:53during the backfill process, no one
  173. 6:55comes into the work zone.
  174. 6:58We have put together a set of
  175. 6:59thought-provoking questions to enhance
  176. 7:02your learning experience.
  177. 7:04What engineering controls could have
  178. 7:06prevented this?
  179. 7:10What types of communication strategies
  180. 7:12could help outline clear expectations to
  181. 7:15reduce assumptions and to support new
  182. 7:17and all types of workers?
  183. 7:21Would completing a daily fieldle hazard
  184. 7:23assessment have raised more awareness?

About this transcript

This page contains the full transcript of Lessons from the Field – a Fall that Could Have Been Prevented | Excavation Safety by Your ACSA Safety, generated from the public captions YouTube serves with the video. The transcript has 1,206 words across 184 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, caption language selection, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.