- 0:11In March 2022, the new employee began
- 0:14working at the company and completed the
- 0:16site safety orientation, health and
- 0:18safety orientation, and an online ground
- 0:21disturbance awareness course on the
- 0:23first morning.
- 0:25The new worker was then given a tour of
- 0:26the work site and introduced to the
- 0:28tasks at hand. The superintendent
- 0:31instructed them to observe and learn
- 0:33from the other workers over the next few
- 0:35days, during which they would also
- 0:37explain the hazards and potential pinch
- 0:39points. The other worker told him the
- 0:41most important thing was to always watch
- 0:43for open holes and to make sure they
- 0:46were covered and had barricades around
- 0:47them. The hazards of falling into open
- 0:50holes or excavations were addressed in
- 0:52several of the company's safety
- 0:54documents. However, there were varying
- 0:57procedures followed at the site for
- 0:59protecting workers from open holes.
- 1:02Utilize hole barricades on holes 24 in
- 1:05or larger in diameter. Unattended open
- 1:08holes to be covered and marked open hole
- 1:10to prevent falls while drilling piles to
- 1:13depth. Ensure barricades and warning
- 1:16signs are in place to prevent property
- 1:18damage while pouring concrete and
- 1:20removing casings.
- 1:22The project hazard assessment in the
- 1:24company's work site safety plan
- 1:27identifies open excavations as a
- 1:29potential hazard associated with
- 1:31drilling. To mitigate this risk, the
- 1:34plan requires the installation of guard
- 1:36rails with the additional precaution
- 1:37that fall protection must be worn if the
- 1:40guardrail needs to be removed for any
- 1:42operation. The guardrails or handrails
- 1:45section of the company's work site
- 1:47safety plan states the following. One,
- 1:50OS legislation compliant guard rails are
- 1:53to be used with excavations.
- 1:56Two, all openings must be barricaded and
- 1:58be covered with reinforced plywood.
- 2:01Three, workers must never leave an
- 2:04opening unattended.
- 2:06Field level hazard assessments completed
- 2:08by site workers and initialed by the new
- 2:10worker a few days prior to the incident
- 2:13identify open hole as a hazard and stay
- 2:16behind the hole barricade as the
- 2:18control.
- 2:21The driller also completed and signed a
- 2:23foreman safety meeting record on the day
- 2:25of the incident 5 hours after the
- 2:27incident. The document lists, "Put
- 2:31plywood down to cover holes as both a
- 2:33task to be done and a hazard control."
- 2:36The rest of the crew, including the new
- 2:38worker, are shown as having either
- 2:40signed or initialed the document between
- 2:4212:32 p.m. and 12:38 p.m., approximately
- 2:465 hours after the incident.
- 2:49On the day of the incident, the employee
- 2:51arrived at work at approximately 7 a.m.
- 2:54and was assigned to assist an employee
- 2:56driller. This was their first time
- 2:58working together. The new employee was
- 3:01replacing the laborer who was not at
- 3:03work that day and was usually assigned
- 3:05to the driller. This was the new
- 3:07employees sixth day of work for the
- 3:09company. While it was standard practice
- 3:12for the workers to have a safety meeting
- 3:13first thing in the morning, they did not
- 3:15have one the morning of the incident.
- 3:18The new worker opened the CCAN and began
- 3:20removing materials. He then went to see
- 3:23the other driller to get some diesel
- 3:24exhaust fluid for his coworker's drill
- 3:26rig. The driller then moved the rig from
- 3:30over top of the hole where he had parked
- 3:32it when they finished work the previous
- 3:33Friday and went to get the skid steer to
- 3:36remove the plywood and backfill the
- 3:38hole. This exposed the plywood covering
- 3:41the hole. The driller says as he was
- 3:43walking to the skid steer, he told the
- 3:45new worker to watch out for holes. The
- 3:48driller says the new worker had no tasks
- 3:50assigned to him that morning, and he
- 3:52does not know why they went to lift the
- 3:54plywood.
- 3:55The company states that there was only
- 3:57one open hole on site, being the one
- 4:00with the parked over top of it. No new
- 4:03holes had been drilled that morning. The
- 4:06new worker said the driller asked him to
- 4:07get a piece of wood to cover a newly
- 4:09drilled hole. He saw the piece of
- 4:12plywood laying on the ground and says he
- 4:14did not realize it was covering an open
- 4:16hole. there was no barrier around it and
- 4:19nothing on top of it. He says there was
- 4:21a light layer of snow on the ground and
- 4:24the plywood and that he could not see
- 4:26the orange paint on it. The new worker
- 4:29was present when they dug the hole on
- 4:30Friday, but by Monday he had forgotten
- 4:33about it. He says that since he was not
- 4:36operating the skid steer, he did not
- 4:38know which holes were filled in on
- 4:39Friday. He would have known the hole was
- 4:42there if it had a barricade around it or
- 4:44something on top of the plywood.
- 4:47The new worker bent down and grabbed the
- 4:49plywood with both hands. And as he stood
- 4:51up, he took a step forward and fell into
- 4:53the hole.
- 4:56He landed on the rebar cage and concrete
- 4:58pile 7 m below. EMS was called and
- 5:02arrived within 10 or 15 minutes. They
- 5:04lowered a harness to the employee and
- 5:06pulled him out of the hole. He was
- 5:08transported to the hospital by ambulance
- 5:10within 30 or 40 minutes of his fall. The
- 5:14employee suffered permanent lifealtering
- 5:16injuries. He also suffers related mental
- 5:19health issues. He spent several weeks in
- 5:22the hospital and is still receiving
- 5:23regular medical care. He is in constant
- 5:26pain and his prognosis is uncertain as
- 5:29it relates to his ability to work in the
- 5:31future.
- 5:32A few days after the incident, the
- 5:35company revised its pile and
- 5:36foundational drilling procedure to
- 5:38include the following rules among
- 5:40others.
- 5:41No one should come within 1.8 m 6 ft of
- 5:45a hole's edge during or after drilling
- 5:48unless they are directly involved in the
- 5:49operation. Workers involved must also
- 5:52stay 1.8 m away from the edge of a
- 5:55drilled hole or queson unless it has a
- 5:58liner extending at least 1 meter above
- 6:00the ground. If the liner is not present,
- 6:03workers must be protected from falling
- 6:05by using a fall protection system or a
- 6:07guardrail around the hole. Fall
- 6:09protection systems shall be anchored to
- 6:11a Lego block and be used as fall
- 6:14restriction systems. This will apply for
- 6:16holes that are larger than 30 in in
- 6:19diameter. A retractable lanyard will be
- 6:22used with the anchor placed at a
- 6:23distance that does not allow for a fall
- 6:25into an open hole to occur. Holes that
- 6:28are 30 in or greater and cannot be
- 6:30backfilled immediately will have a 5tx 5
- 6:33ft/2in steel plate placed over the open
- 6:36hole. If the hole is greater than 46 in,
- 6:40the plate will be adjusted to ensure 1
- 6:42ft of overlap.
- 6:44Prior to removal, guardrails will be
- 6:46placed around the hole. A skid steer
- 6:49will remove the plate with a spotter 7
- 6:51ft away from the hole to ensure that
- 6:53during the backfill process, no one
- 6:55comes into the work zone.
- 6:58We have put together a set of
- 6:59thought-provoking questions to enhance
- 7:02your learning experience.
- 7:04What engineering controls could have
- 7:06prevented this?
- 7:10What types of communication strategies
- 7:12could help outline clear expectations to
- 7:15reduce assumptions and to support new
- 7:17and all types of workers?
- 7:21Would completing a daily fieldle hazard
- 7:23assessment have raised more awareness?
About this transcript
This page contains the full transcript of Lessons from the Field – a Fall that Could Have Been Prevented | Excavation Safety by Your ACSA Safety, generated from the public captions YouTube serves with the video. The transcript has 1,206 words across 184 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, caption language selection, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.