  1. 0:00According
  2. 0:02[music]
  3. 0:14to the US Environmental Protection
  4. 0:16Agency, EPA, green building is the
  5. 0:19practice of creating structures and
  6. 0:21using processes that are environmentally
  7. 0:24responsible and resource efficient
  8. 0:26throughout a building's life cycle, from
  9. 0:28sighting to design, construction,
  10. 0:30operation, maintenance, renovation, and
  11. 0:33deconstruction.
  12. 0:35This practice expands and complements
  13. 0:37the classical building design concerns
  14. 0:39of economy, utility, durability, and
  15. 0:42comfort. Green building is also known as
  16. 0:45a sustainable or high-performance
  17. 0:47building. Green buildings are more
  18. 0:50environmentally sensitive, provide more
  19. 0:52comfort to building occupants, and also
  20. 0:54remain resource efficient and high
  21. 0:56performance buildings throughout their
  22. 0:58entire life cycle. But how does that
  23. 1:00happen? The answer will be explained
  24. 1:03throughout this whole course. However,
  25. 1:05to highlight the major concept of green
  26. 1:07buildings, we must first observe the
  27. 1:09natural system. In the natural cycle,
  28. 1:12there isn't any waste. Even what we term
  29. 1:15animal waste is actually a sustainable
  30. 1:17product which is an organic fertilizer
  31. 1:19in agriculture that improves plant
  32. 1:21nutrition and assists the growth of
  33. 1:23plants. The key factor of animal waste
  34. 1:26is its sustainability.
  35. 1:28It is produced by nature and is
  36. 1:30continuously reused in a never-ending
  37. 1:32loop. Nevertheless, is the waste of
  38. 1:35man-made products also that? Think about
  39. 1:38a plastic bag which takes about 500
  40. 1:41years to break down in the environment
  41. 1:43and creates a great deal of
  42. 1:44environmental harm during its lifetime.
  43. 1:48And now let us think about the built
  44. 1:50environment which refers to all the
  45. 1:52man-made surroundings that are needed
  46. 1:54for human activity from roads to
  47. 1:56buildings to neighborhoods.
  48. 1:59We use most of the world's resources to
  49. 2:01develop our built environments. But do
  50. 2:03they end up like the plastic bag or can
  51. 2:05they continue in nature?
  52. 2:08Green building is really a system that
  53. 2:10evolves by continuously enhancing its
  54. 2:12level of performance in order to get as
  55. 2:15close as possible to the natural system,
  56. 2:17which is by far the most efficient
  57. 2:19system known to man.
  58. 2:22There is not a single building in the
  59. 2:23world that does not have an impact on
  60. 2:25the environment. That being said, the
  61. 2:28way we build can make a great
  62. 2:29contribution towards reducing this
  63. 2:31impact. In the United States, buildings
  64. 2:34account for 14% of potable water
  65. 2:37consumption, 30% of waste output, 40% of
  66. 2:42raw materials use, 38% of carbon dioxide
  67. 2:46emissions, 24 to 50% of energy use, and
  68. 2:5172% of electricity consumption. With 38%
  69. 2:55of the carbon dioxide emissions,
  70. 2:57buildings are on the top of the list and
  71. 3:00produce even more carbon dioxide than
  72. 3:02transportation and industrial, which is
  73. 3:05also important to know for the exam
  74. 3:06purposes. And all the built environment
  75. 3:09contributes to 67% of all greenhouse gas
  76. 3:12emissions. But why do our buildings harm
  77. 3:15the environment? First, when we clear
  78. 3:18the land to make way for a development,
  79. 3:20the wildlife habitat in that area is
  80. 3:22destroyed and the pre-existing permeable
  81. 3:25soil becomes an impermeable surface.
  82. 3:28Second, we manufacture building products
  83. 3:31that pollute water, air, release toxic
  84. 3:34chemicals, and emit greenhouse gases.
  85. 3:37Furthermore, during the building
  86. 3:39operations phase, the building consumes
  87. 3:41energy, which further increases
  88. 3:43greenhouse gas emissions and adds to
  89. 3:46potable water consumption, which later
  90. 3:48becomes a waste product. With the
  91. 3:50commuting of building users and visitors
  92. 3:52to the building, the use of single
  93. 3:55occupancy vehicles results in increased
  94. 3:57energy consumption and greenhouse gas
  95. 4:00emissions. The list of aspects related
  96. 4:02to environmental impact is seemingly
  97. 4:04endless.
  98. 4:06And now let's take a look at the
  99. 4:08benefits of green buildings. When
  100. 4:10looking at the statistics of green
  101. 4:11buildings, a study by the new buildings
  102. 4:14institute found that average energy use
  103. 4:16intensity of green buildings are 24%
  104. 4:19lower when compared to typical
  105. 4:21buildings. Additionally, US General
  106. 4:24Services Administration survey among 12
  107. 4:27green buildings state that green
  108. 4:29buildings accomplish 26% energy use
  109. 4:33reduction, 27% higher levels of occupant
  110. 4:36satisfaction,
  111. 4:3813% lower maintenance costs and 33%
  112. 4:42lower carbon dioxide emissions.
  113. 4:45Occupants of green buildings are exposed
  114. 4:47to far lower levels of indoor pollutants
  115. 4:50and have higher air, lighting, and
  116. 4:52acoustical qualities. According to the
  117. 4:55US Environmental Protection Agency,
  118. 4:57people in the United States spend on
  119. 4:59average 90% of their time indoors, which
  120. 5:03means that developing green buildings
  121. 5:05will make a serious contribution to the
  122. 5:07health and comfort of the building
  123. 5:08occupants as well as to their
  124. 5:10productivity. Regenerative design is
  125. 5:13also an important aspect to mention that
  126. 5:16can be seen to be one step ahead of
  127. 5:18sustainable design. Regenerative design
  128. 5:21is a type of building design that
  129. 5:23creates no waste and provides more
  130. 5:25output than consumed input. As
  131. 5:28regenerative design projects do not use
  132. 5:30any more energy than they produce, they
  133. 5:33are able to return the excess energy to
  134. 5:35the utility. Please note that these
  135. 5:37types of projects which only use their
  136. 5:40own generated energy are also called net
  137. 5:42zero energy projects. In addition to
  138. 5:46their sustainable features, regenerative
  139. 5:48design projects can also contribute to
  140. 5:50the restoration of the lost environment
  141. 5:52and habitat thereby taking regenerative
  142. 5:55design one step ahead of sustainable
  143. 5:58design.
  144. 5:59All green buildings should establish
  145. 6:01three components. One, economic
  146. 6:04prosperity, which represents the profit.
  147. 6:07Two, social responsibility, which
  148. 6:10represents the people, and three,
  149. 6:12environmental stewardship, which
  150. 6:14represents our planet. These three
  151. 6:17components are called the triple bottom
  152. 6:19line. A commitment to the triple bottom
  153. 6:22line means looking beyond a project's
  154. 6:24profitability or considering more than
  155. 6:26just a project's sustainable features or
  156. 6:29social responsibility.
  157. 6:31When developing a green building, the
  158. 6:33main goal is to establish all three
  159. 6:35components at the same time. A green
  160. 6:38building should have an increased value
  161. 6:40and environmentally friendly design and
  162. 6:42should also serve well to its users and
  163. 6:45the community. To illustrate the
  164. 6:47concept, let's assess the triple bottom
  165. 6:49line of a skylight that will be
  166. 6:51installed on the roof of an office
  167. 6:53space. A skylight will reduce the energy
  168. 6:56consumed by lighting fixtures, which
  169. 6:58will reduce greenhouse gas emissions.
  170. 7:01Less energy usage will also mean less
  171. 7:03operating costs and natural daylight
  172. 7:06will create a healthier office space for
  173. 7:08workers. If we are able to address and
  174. 7:11achieve all three components of the
  175. 7:13triple bottom line, why not install the
  176. 7:16skylight?
  177. 7:18The primary greenhouse gases in the
  178. 7:20Earth's atmosphere are water vapor,
  179. 7:22carbon dioxide, nitrous oxide, methane,
  180. 7:26and ozone. Each of them are essential to
  181. 7:29absorb and emit radiation and without
  182. 7:32them the average temperature of the
  183. 7:34earth's surface would be much colder
  184. 7:35than it is now. However, with the
  185. 7:38increasing concentration of carbon
  186. 7:40dioxide in the atmosphere, which is the
  187. 7:43result of human activity, the greenhouse
  188. 7:45gas balance was disturbed. This increase
  189. 7:48became the number one cause for global
  190. 7:51climate change. As the greenhouse gas
  191. 7:53emissions increase, an even larger
  192. 7:56buildup of carbon dioxide occurs in the
  193. 7:58atmosphere, thus warming the climate
  194. 8:00further. As discussed, the built
  195. 8:03environment contributes to 67% of all
  196. 8:07greenhouse gas emissions. This comes
  197. 8:09from building systems and energy use,
  198. 8:12transportation, water use, changes in
  199. 8:15the land cover, building products, and
  200. 8:17construction.
  201. 8:19Although changing the way we build will
  202. 8:21play a significant role in reducing the
  203. 8:23greenhouse gas emissions, merely
  204. 8:25developing green buildings will not be
  205. 8:27enough. To establish a lower carbon
  206. 8:30rate, we need to develop green
  207. 8:32communities as well. The first thing
  208. 8:34that a green community should implement
  209. 8:37is the reduction of the distances that
  210. 8:39vehicles travel. The buildings in the
  211. 8:41suburban areas, even if they are green
  212. 8:43buildings, create greenhouse gas
  213. 8:46emissions due to the long distances that
  214. 8:48people drive every day.
  215. 8:51Additionally, emissions from
  216. 8:52transportation make up half of the total
  217. 8:55emissions associated with the project.
  218. 8:58This also means that the project
  219. 8:59location is another critical factor to
  220. 9:02consider when developing a green
  221. 9:03building. The lead for neighborhood
  222. 9:06development rating system is designed to
  223. 9:08establish green communities which will
  224. 9:11be discussed in later chapters. To take
  225. 9:14our discussion to the next level, we
  226. 9:16will now discuss the common sources of
  227. 9:18greenhouse gas emissions. This table is
  228. 9:21also important to know for the exam
  229. 9:23purposes. The sources of greenhouse gas
  230. 9:26emissions are grouped under three
  231. 9:28scopes. A scope one energy relates to
  232. 9:31the direct energy from the owned or
  233. 9:33controlled sources while a scope 2
  234. 9:36energy relates to the purchased energy
  235. 9:39and scope 3 energy relates to energy
  236. 9:41sources that are not owned or directly
  237. 9:44controlled. To illustrate, the energy
  238. 9:47generated on site through burning of
  239. 9:49fossil fuels will fall under scope one
  240. 9:51energy and the resulting greenhouse gas
  241. 9:54emissions will be classified as a scope
  242. 9:56one emission
  243. 9:58or the electricity bought from a utility
  244. 10:01company will be classified as a scope 2
  245. 10:03energy and the resulting greenhouse gas
  246. 10:05emission will be a scope 2 emission.
  247. 10:11The green building process is very
  248. 10:13different compared to the conventional
  249. 10:15building process. While the conventional
  250. 10:17building process focuses on the
  251. 10:19snapshots, the green building process
  252. 10:22looks at the project as a whole. There
  253. 10:24are three major concepts integral to
  254. 10:26green buildings that are not a part of
  255. 10:28the conventional building process. These
  256. 10:31are systems thinking, life cycle
  257. 10:34thinking and the integrated process. As
  258. 10:37all the buildings are composed of
  259. 10:39different interrelated systems that form
  260. 10:41a hole, each of them has an impact on
  261. 10:44others. Consider a building envelope and
  262. 10:47an HVAC system. The insulation level
  263. 10:50that a building envelope provides will
  264. 10:52affect the size and the operating cost
  265. 10:54of the HVAC. The better the insulation,
  266. 10:57the smaller the HVAC will be, which will
  267. 11:00also mean lower operating costs.
  268. 11:04While a proper waterproofing membrane on
  269. 11:06the building foundation will protect the
  270. 11:08foundation and affect the durability of
  271. 11:10the whole building, this will also
  272. 11:12result in less humidity inside the
  273. 11:14building which will affect both the HVAC
  274. 11:16system and the health of the building
  275. 11:18occupants.
  276. 11:20The systems of a building include
  277. 11:22resources, materials, energy, building
  278. 11:26occupants and information. The term
  279. 11:29systems thinking refers to the
  280. 11:31understanding of each and every system
  281. 11:33of a building while also understanding
  282. 11:35their relationships and looking at the
  283. 11:37project as a whole. The second major
  284. 11:40concept of sustainable thinking concerns
  285. 11:42the life cycle approach which evaluates
  286. 11:45the entire life of a project product or
  287. 11:48service. For example, when selecting a
  288. 11:50building product, the project teams need
  289. 11:53to ask the following questions. What is
  290. 11:55the raw material of the product? Was it
  291. 11:58extracted in a responsible manner? How
  292. 12:01long can the product be used? What will
  293. 12:03happen to the product once its useful
  294. 12:05life ends? Does this product harm the
  295. 12:08environment? And more. Integrated
  296. 12:11process, which is the third major
  297. 12:13concept of sustainable thinking,
  298. 12:15emphasizes the importance of connection
  299. 12:18and communication among all the
  300. 12:20professionals and stakeholders in the
  301. 12:22project. To be able to see the big
  302. 12:25picture, all the different teams in the
  303. 12:27project should act as a single team. The
  304. 12:30stakeholders, architects, engineers, and
  305. 12:32facility managers should work
  306. 12:34collaboratively starting from the
  307. 12:36pre-esign phase of the project so that
  308. 12:38each team member can understand the
  309. 12:40perspectives and strategies of the rest
  310. 12:43of the team. This will enable better
  311. 12:45decisions to be made and assist in
  312. 12:47creating a high performance building. In
  313. 12:50the following sections, we will take a
  314. 12:52closer look at these three major green
  315. 12:54building concepts.
  316. 12:58The main idea behind systems thinking is
  317. 13:00to see that the systems in the building
  318. 13:02do not work in isolation.
  319. 13:05Actually, there is not a single system
  320. 13:07in our universe that works in isolation.
  321. 13:09Everything is interconnected.
  322. 13:12In order to effectively understand
  323. 13:14systems thinking, we need to understand
  324. 13:16the types of systems. There are two
  325. 13:18types of systems. The first type is open
  326. 13:21systems which are systems that
  327. 13:23constantly consume other items, use them
  328. 13:26and produce waste at the end. A whole
  329. 13:28city may be an example of this as it
  330. 13:31imports food, energy and products.
  331. 13:34However, while a city uses products, it
  332. 13:37also produces wastes in turn often in
  333. 13:40the form of sewage, pollution and solid
  334. 13:42waste which consequently marks the end
  335. 13:45of the system. There are no feedback
  336. 13:48loops in the open systems. However, in
  337. 13:51nature, everything is in a loop and thus
  338. 13:54no open system exists. Therefore, this
  339. 13:57is called a closed system which does not
  340. 14:00produce any waste product at the end.
  341. 14:03The system continues independently.
  342. 14:06Think about the water cycle in our
  343. 14:07world. The sun heats and evaporates the
  344. 14:10water on the oceans and the seas and
  345. 14:12then creates water vapor. The resulting
  346. 14:15water vapor rises in air, which
  347. 14:17condenses into rain and goes back to the
  348. 14:20Earth's surface. That water then becomes
  349. 14:23underground water, which again joins the
  350. 14:25oceans and seas with the flow. This
  351. 14:28sustainable cycle does not end. Finding
  352. 14:32ways to develop closed systems in our
  353. 14:34buildings will result in creating
  354. 14:36sustainable buildings. In order to
  355. 14:38establish that, we need to evaluate the
  356. 14:41individual elements in addition to their
  357. 14:43relationships to each other as a whole.
  358. 14:45When designing our buildings, a decision
  359. 14:48made for an individual element will have
  360. 14:51a ripple effect that will affect other
  361. 14:52elements and systems. Remember the
  362. 14:55example about installing a proper
  363. 14:57waterproofing membrane on the building
  364. 14:59foundation which affects the foundation,
  365. 15:02the durability of the whole building,
  366. 15:04the humidity level inside the building,
  367. 15:06the HVAC system and the health of the
  368. 15:09building occupants.
  369. 15:12Understanding the emergent properties of
  370. 15:14systems is also essential in order to
  371. 15:16better evaluate why we need to form
  372. 15:19systems. Every system is a composition
  373. 15:22of its individual parts. Let us take the
  374. 15:24human body as an example in which cells
  375. 15:27form tissues. Tissues form organs.
  376. 15:30Organs form the organ systems and organ
  377. 15:33systems form humans. A lung is made up
  378. 15:36of cells. However, having only lung
  379. 15:39cells together will not do anything. The
  380. 15:42whole system needs to be there. Certain
  381. 15:44properties emerge as the result of
  382. 15:46interaction of individual elements.
  383. 15:49These are called emergent properties of
  384. 15:51the systems and only systems can have
  385. 15:54emergent properties not the individuals.
  386. 15:58The breathing function of the lung is
  387. 16:00the emergent property of a whole
  388. 16:02successful system.
  389. 16:04This is why systems thinking requires
  390. 16:06the creation of emergent properties to
  391. 16:09achieve awarding outcomes. To take the
  392. 16:12discussion to the next level, we will
  393. 16:14now examine feedback loops followed by
  394. 16:17leverage points.
  395. 16:19Feedback loops refer to the flow of
  396. 16:21information within a system that allows
  397. 16:23the system to take action. There are two
  398. 16:25types of feedback loops in systems,
  399. 16:28positive and negative. A positive
  400. 16:31feedback loop can be summarized as A
  401. 16:34producing B, which in turn produces more
  402. 16:37of A. An example of this would be an
  403. 16:40interest earning savings account. As the
  404. 16:42account grows, more interest is earned,
  405. 16:45which in turn brings further account
  406. 16:46growth.
  407. 16:48In negative feedback loops, a change
  408. 16:51brings an additional change in the
  409. 16:52opposite direction. If a room gets
  410. 16:55warmer than the set temperature, the
  411. 16:57thermostat will send a signal to the air
  412. 16:59conditioning and the air conditioning
  413. 17:01will stop blowing warm air.
  414. 17:03Understanding these feedback loops is
  415. 17:05crucial for designing sustainable
  416. 17:07buildings and neighborhoods. With the
  417. 17:10feedback loops providing the flow of
  418. 17:12information, the system can take action
  419. 17:14when there's a problem. Since the
  420. 17:17positive feedback loops don't stop, they
  421. 17:20may create problems in the systems if
  422. 17:22they're unchecked. However, if the
  423. 17:25positive feedback loops are checked with
  424. 17:27the negative feedback loops, the system
  425. 17:29can stop if there is too much of
  426. 17:31something. With the current technology,
  427. 17:34both feedback loops can be implemented
  428. 17:36by the use of sensors, controls,
  429. 17:39building automation systems, and more. A
  430. 17:42building automation system can show
  431. 17:44building management the excess energy
  432. 17:46usage statistics by tracking the
  433. 17:49individual consumption of all the
  434. 17:51building systems.
  435. 17:52Equipped with only this information, the
  436. 17:55building management can then respond and
  437. 17:58try to discover ways to reduce the
  438. 18:00energy use. This is called the Prius
  439. 18:03effect, which means that users can
  440. 18:05respond to something only if they have
  441. 18:07realtime information about it. And now
  442. 18:10we will continue our discussion with
  443. 18:12leverage points. A small change can
  444. 18:15yield big changes. In other words, any
  445. 18:18action taken in a leverage point of the
  446. 18:21system can bring about significant
  447. 18:23results in the system. Think about a
  448. 18:25construction site that is located close
  449. 18:27to a river and that river is the main
  450. 18:30irrigation source of the surrounding
  451. 18:32farmlands. If the construction site does
  452. 18:35not take any action to stop
  453. 18:36sedimentation and pollution resulting
  454. 18:39from the construction activities, the
  455. 18:41whole river can then become
  456. 18:43contaminated. This will then contaminate
  457. 18:45the farmlands which will result in
  458. 18:48contaminated foods. However, by taking
  459. 18:51action to avoid sedimentation and
  460. 18:53pollution to the river, which is really
  461. 18:55a small action when considering the
  462. 18:57outcome, a whole river can be saved that
  463. 19:00will also result in saving the farmlands
  464. 19:03and human health. Being able to see
  465. 19:06where actions can yield big changes is a
  466. 19:08very important part of systems thinking,
  467. 19:11and only by asking questions can project
  468. 19:14teams thus provide insight to move
  469. 19:16toward sustainability.
  470. 19:19The second major concept of sustainable
  471. 19:22thinking is the life cycle approach.
  472. 19:25Green buildings need a life cycle
  473. 19:26approach and project teams should always
  474. 19:29look at the big picture by evaluating
  475. 19:31all phases of the project together
  476. 19:33rather than merely looking at the
  477. 19:35snapshots. A life cycle of a building
  478. 19:38covers location selection, design,
  479. 19:41construction, operations and
  480. 19:43maintenance, refurbishment, and
  481. 19:45renovation or demolition. At the very
  482. 19:48beginning of the project, the project
  483. 19:50teams need to think about the very last
  484. 19:52phase of the building, which would be
  485. 19:54the demolition or complete renovation.
  486. 19:57Let's consider a wood flooring product
  487. 20:00that is selected to be used in the
  488. 20:02project. Project teams need to evaluate
  489. 20:04the raw material manufacturer of the
  490. 20:06wood flooring by asking the following
  491. 20:09questions. Was the wood extracted in a
  492. 20:12responsible manner? or after cutting
  493. 20:15trees, does the wood manufacturer plant
  494. 20:17new trees in order to avoid
  495. 20:19deforestation?
  496. 20:21Then the project teams also need to
  497. 20:23consider the cost and durability of the
  498. 20:26product as well as evaluating what can
  499. 20:28happen to the wood flooring after its
  500. 20:30useful life. Can it be recycled or will
  501. 20:33it become waste? This practice which
  502. 20:36investigates materials from their
  503. 20:38extraction to their disposal is called
  504. 20:40cradle to grave. In order to avoid
  505. 20:44waste, closed systems should be formed
  506. 20:47and a product should become a part of
  507. 20:49another product after its useful life
  508. 20:51through recycling or reusing. Evaluating
  509. 20:54products according to this philosophy is
  510. 20:57called a cradleto cradle approach which
  511. 20:59aims to extend the product's life cycle
  512. 21:01to avoid waste. To examine the
  513. 21:04environmental cost of a product to
  514. 21:06nature, the energy consumed resulting
  515. 21:09from a product's manufacturing,
  516. 21:11transportation, installation, use, and
  517. 21:14disposal should also be evaluated.
  518. 21:17The total energy consumed in all of
  519. 21:19these stages is called the embodied
  520. 21:22energy. By way of illustration, think
  521. 21:25about a marble mined in China,
  522. 21:28manufactured in Europe, brought to the
  523. 21:31United States for purchase, and then
  524. 21:33bought by a project to be used in the
  525. 21:35building. The embodied energy of that
  526. 21:38marble will include all the energy
  527. 21:40consumed for the extraction,
  528. 21:42manufacture, transportation,
  529. 21:45installation at the site, and finally
  530. 21:47the energy needed for disposal. The more
  531. 21:50embodied energy a product contains will
  532. 21:53result in more damage to the
  533. 21:55environment. When deciding on the
  534. 21:58products to be used in the projects and
  535. 22:00to support decision-making of the
  536. 22:02project teams, the life cycle approach
  537. 22:04should be implemented to environmental
  538. 22:07considerations with the life cycle
  539. 22:09assessment LCA and to cost
  540. 22:12considerations with the life cycle
  541. 22:14costing LCC.
  542. 22:17Life cycle assessment evaluates all the
  543. 22:19environmental effects of a product
  544. 22:21during the whole lifetime of that
  545. 22:23material. A cradletograve or cradleto
  546. 22:26cradle approach is used in LCA and the
  547. 22:30total energy use and other environmental
  548. 22:33consequences resulting from the creation
  549. 22:36of that material is calculated. Hence
  550. 22:39the benefits of conducting an LCA for
  551. 22:42the whole building is beneficial to see
  552. 22:44the trade-offs between different
  553. 22:46materials and this would also enable
  554. 22:48selection of the materials that would be
  555. 22:51the best fit for the project and the
  556. 22:53environment. Life cycle costing assesses
  557. 22:56a product's total cost by evaluating
  558. 22:58both the purchase price and its
  559. 23:01operating costs. For example, a more
  560. 23:04expensive but more durable refrigeration
  561. 23:06system can cost less compared to a less
  562. 23:09expensive but less durable one. Since
  563. 23:12the less durable refrigeration system
  564. 23:15will require more maintenance and will
  565. 23:17have a shorter lifetime, using that
  566. 23:20system may result in more expenditure in
  567. 23:22total to the project owner. Life cycle
  568. 23:25thinking should be applied to all
  569. 23:27decisions made in green building, not
  570. 23:29only to product selection. Setting
  571. 23:32targets and discovering ways to find the
  572. 23:34best solutions early in the project can
  573. 23:36yield great results.
  574. 23:40The third and final major concept of
  575. 23:42sustainable thinking is the integrated
  576. 23:44process which is the key to applying
  577. 23:46sustainable thinking to real life
  578. 23:48situations. Remember the example about
  579. 23:51the system of the human body. The lung
  580. 23:54is made up of lots of cells. However,
  581. 23:56when the cells are put together without
  582. 23:58the whole system in place, these cells
  583. 24:01cannot perform the breathing function of
  584. 24:03the lung. Without a working system, an
  585. 24:05emergent property cannot be created.
  586. 24:08Assembling project stakeholders,
  587. 24:10architects, and engineers will not
  588. 24:13create a successful project. Rather, a
  589. 24:16system should be formed with the flow of
  590. 24:18information and collaboration between
  591. 24:21each member. To better understand the
  592. 24:23topic, we will now discuss the
  593. 24:25conventional building process and then
  594. 24:27continue explaining the details of the
  595. 24:29integrated building process.
  596. 24:31In the conventional building process,
  597. 24:34project teams work in isolation and
  598. 24:36collaborate when problems occur.
  599. 24:39Usually, the process starts with a
  600. 24:41project owner hiring an architectural
  601. 24:43firm to develop the design. As the
  602. 24:46design progresses, the architectural
  603. 24:48firm hires electrical and mechanical
  604. 24:51designers who then start integrating the
  605. 24:53electrical and mechanical parts of the
  606. 24:55design separately. Then construction
  607. 24:58plans are issued and the owner starts
  608. 25:00the bidding process. In this phase,
  609. 25:03different general contractors are
  610. 25:05requested to bid and once all the bids
  611. 25:08are submitted, the owner chooses the
  612. 25:10general contractor and awards the
  613. 25:11construction of the project. This is
  614. 25:14called the design bid build process.
  615. 25:17With this approach, the general
  616. 25:19contractor was not involved in the
  617. 25:21design phase at all. And furthermore,
  618. 25:23they didn't have any collaboration with
  619. 25:25the architectural firm. In addition,
  620. 25:28they didn't have any collaboration with
  621. 25:29the mechanical and electrical designers.
  622. 25:32During the construction phase, as
  623. 25:34problems arise, the general contractor
  624. 25:37will invite the architectural firm. In
  625. 25:39turn, the architectural firm, if needed,
  626. 25:42will invite the electrical and
  627. 25:44mechanical designers to the meetings in
  628. 25:46order to solve the problems at hand. And
  629. 25:48the outcome will usually be construction
  630. 25:50delays and extra project costs.
  631. 25:54Referring to the human body system
  632. 25:56example, all the cells were there, but
  633. 25:58the system was not working.
  634. 26:04[music]
  635. 26:10[music]
  636. 26:16In order to establish an integrated
  637. 26:18building process, a working system needs
  638. 26:20to be created and the system should be
  639. 26:23active as early as possible during the
  640. 26:25pre-esign phase or even before deciding
  641. 26:28on the project location. Think about the
  642. 26:31following questions. How is the climate
  643. 26:34in the project's location? What type of
  644. 26:36heating and cooling system should be
  645. 26:38installed? How should the building be
  646. 26:41oriented in order to get more sunlight
  647. 26:43into the building? Is there enough
  648. 26:45rainfall on the location to capture and
  649. 26:47use rainwater for irrigation?
  650. 26:50What are the project owner's goals and
  651. 26:52requirements?
  652. 26:54How will the building occupants commute
  653. 26:56once the project is finished?
  654. 26:59What are the public transportation
  655. 27:01options? How will the resources and
  656. 27:04construction materials be transported to
  657. 27:06the project site? What are the building
  658. 27:09code requirements in the project's
  659. 27:10location? How does energy get to the
  660. 27:13site? What is the type of soil on site
  661. 27:17or what type of vegetation exists on
  662. 27:20site? They're really the type of
  663. 27:22questions that should be addressed
  664. 27:23during the earliest phase of the
  665. 27:25project. This is why the key in the
  666. 27:28integrated process is to integrate the
  667. 27:30whole project team early in order to
  668. 27:33develop an efficient project design and
  669. 27:35allow the project team to discover
  670. 27:37strategies. Taking actions late in the
  671. 27:40process will only result in delays and
  672. 27:43additional costs. It can also be noticed
  673. 27:46that most of the previous questions
  674. 27:48depend on the project's location. To
  675. 27:51turn the project goals into reality, a
  676. 27:53strong evaluation of the project
  677. 27:55location is mandatory. The project
  678. 27:58location should assist the project teams
  679. 28:00rather than creating challenges.
  680. 28:03The preferred sequence is to set the
  681. 28:06project goals first and then choose the
  682. 28:08location that best fits to those goals.
  683. 28:11If the sequencing is vice versa, project
  684. 28:14teams should still need to search and
  685. 28:16discover ways to establish project
  686. 28:17goals. However, they can also face more
  687. 28:20problems.
  688. 28:22Understanding the whole community is
  689. 28:24also essential for successful project
  690. 28:26integration. If people need to drive
  691. 28:29single occupancy vehicles to commute to
  692. 28:31a building, the project will generate
  693. 28:33greenhouse gas emissions.
  694. 28:36The climate in the project location is
  695. 28:38another factor which will impact all the
  696. 28:40building systems.
  697. 28:42The soil type will also change according
  698. 28:45to the location which will affect the
  699. 28:47whole structural calculation of the
  700. 28:49building in turn and lead to changes in
  701. 28:51the whole structural design. As with a
  702. 28:54weak soil, a building can need a deep
  703. 28:57foundation. However, this may not be the
  704. 29:00case with other types of soil. Even the
  705. 29:03level of the underground water for a
  706. 29:06particular location can make a huge
  707. 29:08impact to the design and construction of
  708. 29:10the basement levels as well as the whole
  709. 29:13building. When evaluating the site, it
  710. 29:16is always recommended to work with
  711. 29:17experts such as hydraologists,
  712. 29:20engineers, ecologists, and project
  713. 29:22development consultants
  714. 29:25evaluating the zoning and local codes,
  715. 29:28international code council, Americans
  716. 29:31with Disabilities Act, and all other
  717. 29:33applicable laws for that location at the
  718. 29:35beginning of the project is also
  719. 29:37essential. Most of the mentioned laws
  720. 29:40will depend on the project's location
  721. 29:42and they will take precedence over lead
  722. 29:44requirements. For example, zoning and
  723. 29:47local codes will determine the building
  724. 29:49height, type of project to be
  725. 29:51constructed, size of the building or the
  726. 29:54minimum parking requirements for a
  727. 29:56particular location, not lead. Now,
  728. 30:00let's summarize the main principles of
  729. 30:02the integrated process. Rule number one,
  730. 30:06process matters. Or in other words, the
  731. 30:09system should work efficiently.
  732. 30:12Rule number two, start early, which
  733. 30:15means that the system should be active
  734. 30:17as early as possible. Rule number three,
  735. 30:20follow through, which really means that
  736. 30:23the commitment should continue
  737. 30:25throughout the life of the project. It
  738. 30:27should not end with the completion of
  739. 30:29construction in order to ensure the
  740. 30:31project strategies are maintained and
  741. 30:34all the building systems are still
  742. 30:35efficient through the building operation
  743. 30:37phase. Rule number four, look beyond
  744. 30:41initial costs to long-term savings.
  745. 30:45Green strategies have very short payback
  746. 30:47periods and project stakeholders should
  747. 30:49be informed that their project will
  748. 30:51actually cost less in the long run.
  749. 30:55Rule number five, include and
  750. 30:58collaborate. The professional project
  751. 31:00team should work together with the
  752. 31:02members of the community and always look
  753. 31:04at the big picture. And to establish a
  754. 31:07working system among the project team
  755. 31:09members, stakeholders and members of the
  756. 31:12community, an iterative process needs to
  757. 31:15be developed.
  758. 31:21[music]
  759. 31:25[music]
  760. 31:31Founded in the early 1990s and based in
  761. 31:34Washington DC, US Green Building Council
  762. 31:38or in short USGBC is a nonprofit
  763. 31:41organization committed to a sustainable
  764. 31:44future through cost and energyefficient
  765. 31:46green buildings. USGBC is made up of
  766. 31:49tens of thousands of member
  767. 31:51organizations, chapters, and student and
  768. 31:54community volunteers.
  769. 31:56Currently, there are more than 76
  770. 31:58chapters, 16,000 member organizations,
  771. 32:01and more than 200,000 lead
  772. 32:04professionals, which continues to grow.
  773. 32:07Members of USGBC include engineers,
  774. 32:10architects, building owners,
  775. 32:12contractors, facility managers, building
  776. 32:15product manufacturers, designers,
  777. 32:17utility managers, college students,
  778. 32:20college faculties, government agencies,
  779. 32:22and more. USGBC promotes buildings that
  780. 32:26are environmentally responsible,
  781. 32:28profitable, and which support human
  782. 32:30health. It is also very important to
  783. 32:34mention USGBC's mission, vision, and
  784. 32:37guiding principles which are essential
  785. 32:39to know for the exam. USGBC's mission is
  786. 32:43to transform the way buildings and
  787. 32:46communities are designed, built, and
  788. 32:48operated, enabling an environmentally
  789. 32:50and socially responsible, healthy, and
  790. 32:53prosperous environment that improves the
  791. 32:56quality of life. And USGBC's vision
  792. 33:00states that buildings and communities
  793. 33:02will regenerate and sustain the health
  794. 33:04and vitality of all life within a
  795. 33:07generation.
  796. 33:09USGBC accomplishes this mission through
  797. 33:12LEAD, credentials, Greenbuild
  798. 33:15International Conference and Expo,
  799. 33:17education, advocacy, and chapters and
  800. 33:21committees. LEAD is currently the most
  801. 33:23widely known and used green building
  802. 33:26program across the world. While the lead
  803. 33:29green associate credential as well as
  804. 33:31the various lead AP credentials offer
  805. 33:34professionals a designation to help them
  806. 33:36stand out in the building industry and
  807. 33:39green build international conference and
  808. 33:41expo is the world's largest expo
  809. 33:43dedicated to green building launched in
  810. 33:462002.
  811. 33:47And now let's take a look at the guiding
  812. 33:50principles of USGBC which are
  813. 33:52establishing leadership, promoting the
  814. 33:55triple bottom line, maintaining
  815. 33:57integrity, foster social equity,
  816. 34:00reconcile humanity with nature, exhibit
  817. 34:03transparency, and ensuring
  818. 34:06inclusiveness.
  819. 34:08And now let's take a closer look at lead
  820. 34:11green building rating system. LEAD
  821. 34:14stands for leadership in energy and
  822. 34:17environmental design which is a system
  823. 34:20developed by USGBC to certify
  824. 34:23high-performance buildings and
  825. 34:25sustainable neighborhoods. Lead green
  826. 34:28building rating system is a voluntary
  827. 34:31consensus-based rating system that
  828. 34:33provides third-party verification that a
  829. 34:35building or community was designed and
  830. 34:38built to establish energy savings, water
  831. 34:41efficiency, location efficiency,
  832. 34:43improved indoor environmental quality,
  833. 34:46and stewardship of resources and
  834. 34:48sensitivity to their impacts. LEAD
  835. 34:51addresses all building types through
  836. 34:53different rating systems and evaluates a
  837. 34:56building's performance throughout the
  838. 34:57building's life cycle. The creation of
  839. 34:59the LEAD green building rating system is
  840. 35:02led by USGBC member-based volunteer
  841. 35:05committees, subcommittees, and working
  842. 35:08groups in conjunction with USGBC staff.
  843. 35:11After development, LEAD's green building
  844. 35:14rating systems are subject to review and
  845. 35:17approval by the LEAD steering committee
  846. 35:19and the USGBC board of directors prior
  847. 35:22to a vote by USGBC membership. LEAD was
  848. 35:26created to define green building by
  849. 35:29establishing a common standard of
  850. 35:31measurement, promote integrated whole
  851. 35:34building design practices,
  852. 35:36recognize environmental leadership in
  853. 35:38the building industry, stimulate green
  854. 35:41competition, raise consumer awareness of
  855. 35:45green building benefits, and transform
  856. 35:48the building market. The number of
  857. 35:50leadcertified projects around the world
  858. 35:52are increasing each day as well as in
  859. 35:55the United States. US General Services
  860. 35:58Administration required all new federal
  861. 36:00government construction projects and
  862. 36:02renovations to achieve at least lead
  863. 36:05silver certification and currently
  864. 36:07requires them to achieve lead gold
  865. 36:09certification.
  866. 36:11Another important organization of USGBC
  867. 36:14to mention is the Green Business
  868. 36:16Certification Inc. In short, GBCI
  869. 36:20Green Business Certification, Inc.,
  870. 36:22which was formerly known as Green
  871. 36:24Building Certification Institute before
  872. 36:26changing its name in 2015, is the sister
  873. 36:30organization of USGBC.
  874. 36:32GBCI administers the lead building
  875. 36:35certification and lead professional
  876. 36:37accredititations.
  877. 36:39When a project submits all the necessary
  878. 36:41documents for a lead application, GBCI
  879. 36:44is the organization that will review the
  880. 36:46application and determine if all the
  881. 36:48requirements set forth in a lead rating
  882. 36:51system is fully met or not. And if the
  883. 36:54requirements are fulfilled, GBCI will
  884. 36:57grant the lead certificate.
  885. 36:59Lead exams are also administered by GBCI
  886. 37:03and lead professional credentials are
  887. 37:05awarded according to the exam results.
  888. 37:08For the exam purposes, knowing the
  889. 37:10duties of USGBC and GBCI are essential.
  890. 37:17Leadcertified buildings are proven to be
  891. 37:19environmentally friendly and respect
  892. 37:21human health. Additionally, the major
  893. 37:24benefits of a lead certification can be
  894. 37:26summarized as money savings over the
  895. 37:28lifetime of a project, increased project
  896. 37:31value, and increased building occupant
  897. 37:34satisfaction.
  898. 37:35Lead projects are known to be much more
  899. 37:37energyefficient compared to regular
  900. 37:39buildings with their low operating
  901. 37:41costs. The same thing applies for water
  902. 37:44consumption as leadcertified buildings
  903. 37:47consume less potable water compared to
  904. 37:49regular buildings. Leadcertified
  905. 37:52projects have an increased building
  906. 37:53value which means more return on
  907. 37:56investment. Lead is also a great
  908. 37:58marketing tool for developers which
  909. 38:00results in high occupancy rates. Since
  910. 38:03the building systems and leadcertified
  911. 38:05projects are commissioned during the
  912. 38:07design and construction phases as a
  913. 38:09requirement, the building systems create
  914. 38:12less problems during the building
  915. 38:13operations phase. Furthermore, people
  916. 38:16who work in leadcertified buildings have
  917. 38:19increased productivity due to the
  918. 38:21healthier environment of the buildings,
  919. 38:23which is the result of increased
  920. 38:25exposure to natural daylight, increased
  921. 38:27ventilation rates inside the building,
  922. 38:30less contaminated indoor air, more open
  923. 38:33spaces, increased acoustic performance,
  924. 38:36and many other aspects.
  925. 38:38Even though the initial cost of a
  926. 38:40leadcertified building may be slightly
  927. 38:42higher than a regular building, the life
  928. 38:44cycle cost of a regular building becomes
  929. 38:47much higher than a leadcertified
  930. 38:49building. With that being said, lead is
  931. 38:52not the only green building rating
  932. 38:54system in the world. It is also
  933. 38:56essential to discuss the other green
  934. 38:58building rating systems for the exam
  935. 39:00purposes. BRE, Casby, Green Globes and
  936. 39:04GB Tool are some of the other green
  937. 39:06building rating systems across the
  938. 39:08world.
  939. 39:10Building research establishments
  940. 39:12environmental assessment method in short
  941. 39:14BREE is a green building rating system
  942. 39:17developed in the United Kingdom used
  943. 39:19primarily in Europe.
  944. 39:22Comprehensive assessment system for
  945. 39:24building environmental efficiency in
  946. 39:26short CASBY is a green building
  947. 39:29management system in the Japanese
  948. 39:30market.
  949. 39:32Green building initiatives green globes
  950. 39:34US certification is a newer rating
  951. 39:37system which is adapted from Green
  952. 39:39Globes Canada. And last GB tool and SB
  953. 39:44tool are online international green
  954. 39:46building rating systems.
  955. 39:49There are also a growing number of state
  956. 39:51and local governments that are revising
  957. 39:53their building codes and standards in
  958. 39:55order to implement green principles. The
  959. 39:58International Green Construction Code,
  960. 40:00in short, IGCC, establishes baseline
  961. 40:04regulations about the green features of
  962. 40:06projects and also addresses a building's
  963. 40:09water efficiency, energy efficiency,
  964. 40:12site impacts, types and contents of
  965. 40:15materials used, and more. IGCC is
  966. 40:18developed by the International Code
  967. 40:20Council in short IC which is known to
  968. 40:24develop building codes mainly dedicated
  969. 40:26to building safety and fire prevention.
  970. 40:29In addition, local jurisdictions, local
  971. 40:33governments, and local building codes
  972. 40:35started to adopt IGCC codes, which
  973. 40:38enforce projects to implement green
  974. 40:41principles both in design and in
  975. 40:43construction.
  976. 40:45When adapted by jurisdictions, local
  977. 40:47governments or local building codes,
  978. 40:49IGCC becomes forcible unlike the other
  979. 40:53green building rating systems.
  980. 40:56In order to promote green developments,
  981. 40:59many municipalities award structural or
  982. 41:01financial incentives to developers or
  983. 41:04homeowners who practice green building
  984. 41:06techniques. The structural incentives
  985. 41:09provide rewards for green building
  986. 41:10projects by making available additional
  987. 41:13density bonuses or expedited permitting
  988. 41:16processes. Even though the review and
  989. 41:18permitting processes vary from one
  990. 41:20jurisdiction to another, they are
  991. 41:23generally lengthy processes. By reducing
  992. 41:25the review and permitting durations in
  993. 41:28exchange for developers establishment of
  994. 41:30green building standards, municipalities
  995. 41:33encourage developers to design green
  996. 41:35buildings. Density and height bonuses
  997. 41:38are another structural incentive. Many
  998. 41:41municipalities allow for percentage
  999. 41:43increases in Florida area ratio or other
  1000. 41:46measures of density contingent upon
  1001. 41:48certification or proof of green building
  1002. 41:50practices. Now, let's take a look at the
  1003. 41:53financial incentives. The financial
  1004. 41:55incentives are direct incentives in the
  1005. 41:58form of tax credits or grants to
  1006. 42:00developers that build green buildings.
  1007. 42:03Some municipalities offer reductions or
  1008. 42:05waiverss for permit review or other
  1009. 42:08ownerous permitting processes in
  1010. 42:10exchange for developers use of green
  1011. 42:12building standards. Revolving loan funds
  1012. 42:15can also be available to those seeking
  1013. 42:18to build or renovate to green building
  1014. 42:20standards. If a developer is unfamiliar
  1015. 42:23with green building practices, many
  1016. 42:25municipalities provide free planning or
  1017. 42:28certification training and assistance.
  1018. 42:31Marketing assistance is also offered to
  1019. 42:33promote green buildings, and many
  1020. 42:35municipalities offer free marketing
  1021. 42:37assistance via signage, awards,
  1022. 42:40websites, and/or press releases.
  1023. 42:45Lead professional credentials offer
  1024. 42:47professionals a designation to help them
  1025. 42:50stand out in the building industry.
  1026. 42:52Currently, there are three main tiers of
  1027. 42:54lead professional credentials which are
  1028. 42:58lead green associate, lead accredited
  1029. 43:01professional with specialty and lead
  1030. 43:03fellow. Let's start with discussing the
  1031. 43:06lead green associate credential. GBCI
  1032. 43:10has created the lead green associate
  1033. 43:12credential for professionals who want to
  1034. 43:14demonstrate green building knowledge and
  1035. 43:16expertise in non-technical fields of
  1036. 43:18practice to denote basic knowledge of
  1037. 43:21green design construction and
  1038. 43:23operations.
  1039. 43:25Lead green associates have a proven
  1040. 43:27up-to-date understanding of green
  1041. 43:29building principles and practices.
  1042. 43:32One important thing to note is that the
  1043. 43:35lead GA abbreviation is disapproved by
  1044. 43:38the USGBC
  1045. 43:40and cannot be used to demonstrate lead
  1046. 43:42green associate professional credential.
  1047. 43:46The second tier of the lead professional
  1048. 43:48credentials is the lead accredited
  1049. 43:50professional with specialty in short
  1050. 43:53lead AP with specialty.
  1051. 43:56Lead AP with specialty credential is
  1052. 43:59created for professionals with advanced
  1053. 44:02knowledge in green building practices
  1054. 44:04and specialized in a particular lead
  1055. 44:06rating system. The lead AP credential is
  1056. 44:09divided into different specialties which
  1057. 44:12is designed to show in-depth knowledge
  1058. 44:14of a particular rating system which are
  1059. 44:17lead AP building design plus
  1060. 44:19construction, lead AP interior design
  1061. 44:23plus construction, lead AP operations
  1062. 44:26plus maintenance, lead AP neighborhood
  1063. 44:29development and the lead AP homes. There
  1064. 44:33is also a lead AP credential without any
  1065. 44:36specialty called lead AP or legacy lead
  1066. 44:39AP which was granted to professionals
  1067. 44:42whom have passed the lead AP exam before
  1068. 44:452009.
  1069. 44:46Legacy lead AP credential is not offered
  1070. 44:49anymore and all the new lead APS should
  1071. 44:52choose a specialty. The third and last
  1072. 44:54tier of the lead professional
  1073. 44:56credentials is the lead fellow
  1074. 44:58credential. According to USGBC,
  1075. 45:02lead fellow designates the most
  1076. 45:04exceptional professionals in the green
  1077. 45:06building industry and it is the most
  1078. 45:08prestigious designation awarded.
  1079. 45:10Outstanding lead APS who have
  1080. 45:12demonstrated exceptional achievement in
  1081. 45:15key mastery elements related to
  1082. 45:17technical knowledge and skill are
  1083. 45:19eligible for the honor. Lead fellows
  1084. 45:21have also made significant contributions
  1085. 45:24in teaching, mentoring or research with
  1086. 45:26proven outcomes and have a history of
  1087. 45:29exemplary leadership, impactful
  1088. 45:31commitment, service and advocacy in
  1089. 45:35green building and sustainability.
  1090. 45:37Other than the mentioned credentials,
  1091. 45:39there are also lead professional
  1092. 45:41certificates which are needed to become
  1093. 45:43lead for home green raiders or just
  1094. 45:46green raiders. Green Raiders provide
  1095. 45:49infield verification to every lead for
  1096. 45:52homes project. One thing to note is that
  1097. 45:56the other rating systems do not require
  1098. 45:58any infield verification.
  1099. 46:01Lead APS or lead green associates may
  1100. 46:04also choose to become lead reviewers to
  1101. 46:07evaluate the educational lead courses on
  1102. 46:09the education at USGBC
  1103. 46:12which is the education portal of USGBC.
  1104. 46:16In exchange, USGBC provides
  1105. 46:19complimentary year-long subscription to
  1106. 46:21the USGBC's education portal. For the
  1107. 46:25exam purposes, it's essential to know
  1108. 46:27that the credentiing exams and building
  1109. 46:30certifications are administered by GBCI
  1110. 46:34and not USGBC.
  1111. 46:37While the lead reference guides, lead
  1112. 46:39online, lead rating systems and the
  1113. 46:42education programs are developed and
  1114. 46:45managed by USGBC.
  1115. 46:48Lead online is shared by both USGBC and
  1116. 46:52GBCI.
  1117. 46:54Lead credentials are for people while
  1118. 46:56the lead rating systems are for
  1119. 46:58buildings and neighborhoods.
  1120. 47:01And last, professionals are accredited.
  1121. 47:04buildings are certified.
  1122. 47:08Lead green associates and lead APS with
  1123. 47:11specialty should maintain their
  1124. 47:12credentials by meeting the requirements
  1125. 47:15of the credential maintenance program
  1126. 47:17every 2 years or otherwise the
  1127. 47:19credential will expire and retaking the
  1128. 47:22exam will be necessary to maintain the
  1129. 47:25lead professional credential. Under the
  1130. 47:27credential maintenance program, all the
  1131. 47:30lead green associates must earn 15
  1132. 47:32continuing education hours while the
  1133. 47:35lead APS with specialty will need to
  1134. 47:37earn 30 continuing education hours every
  1135. 47:402 years after earning their credential.
  1136. 47:44Before diving into the lead rating
  1137. 47:46systems, it is also important to mention
  1138. 47:48lead online which is the online platform
  1139. 47:51of USGBC.
  1140. 47:54In lead online, project teams can
  1141. 47:56register their project for lead
  1142. 47:58certification, pay their certification
  1143. 48:01fees, upload their lead submittals,
  1144. 48:04submit documentation and photos, access
  1145. 48:07their credit templates and calculators,
  1146. 48:10contact their project reviewers, contact
  1147. 48:13customer support, and more. for
  1148. 48:16documenting the lead prerequisites and
  1149. 48:18the credits. The project teams should
  1150. 48:20fill the credit templates in lead
  1151. 48:23online. With the use of credit
  1152. 48:25templates, every lead project prepares
  1153. 48:28lead submittals in the same format. This
  1154. 48:31streamlines the preparation of lead
  1155. 48:33applications as well as the review
  1156. 48:35durations for the prerequisites and
  1157. 48:38credits that require any calculation.
  1158. 48:41Credit calculators are also built into
  1159. 48:43the credit templates. To document the
  1160. 48:45credit calculations, the project teams
  1161. 48:48will input their calculation data into
  1162. 48:50the credit template. At last, all the
  1163. 48:54project team members can have access to
  1164. 48:56the prerequisites and credits uploaded
  1165. 48:58to the lead online. Please note that
  1166. 49:01lead online is shared by both USGBC and
  1167. 49:05GBCI since GBCI will be responsible for
  1168. 49:09reviewing the submitted documents and
  1169. 49:11granting the lead certification.
  1170. 49:20[music]
  1171. 49:25[music]
  1172. 49:29Just like a car rental company
  1173. 49:30categorizing its rental vehicles into
  1174. 49:33categories as SUVs, minivans, compact
  1175. 49:36cars, or standardsized cars, LEAD
  1176. 49:39categorizes projects under lead rating
  1177. 49:41systems according to their types of
  1178. 49:43construction and space usage. For
  1179. 49:47example, a newly built school project
  1180. 49:49may fall under the lead building design
  1181. 49:52plus construction schools rating system,
  1182. 49:55but a hotel interior renovation project
  1183. 49:58would fall under the lead interior
  1184. 50:00design plus construction hospitality.
  1185. 50:03The first thing a project team should do
  1186. 50:05is to choose the lead's rating system
  1187. 50:07that's appropriate for their project
  1188. 50:09before registering the project for the
  1189. 50:11lead certification. and then the project
  1190. 50:14team can proceed with registering their
  1191. 50:16project in lead online.
  1192. 50:19No one can blame a sports car for not
  1193. 50:21handling the road properly on a dusty
  1194. 50:23mountain road. However, an SUV would be
  1195. 50:27required to perform well in mountain
  1196. 50:29roads. Just like we have different
  1197. 50:31expectations for each vehicle category,
  1198. 50:34lead has different expectations for each
  1199. 50:37rating system in order to award the lead
  1200. 50:40certification. To summarize, after a
  1201. 50:43rating system is selected, project teams
  1202. 50:45should basically need to work on
  1203. 50:47fulfilling its requirements.
  1204. 50:50Let's take a look at the first
  1205. 50:51requirement which is applicable to all
  1206. 50:53the lead rating systems. In other words,
  1207. 50:56it's applicable to all the projects that
  1208. 50:58want to pursue lead certification.
  1209. 51:01It's called the minimum program
  1210. 51:03requirements or MPRs. This will also be
  1211. 51:07discussed in the following sections in
  1212. 51:08more depth. But to summarize, a project
  1213. 51:11must be in a permanent location on
  1214. 51:14existing land, must use reasonable lead
  1215. 51:17boundaries, and must comply with the
  1216. 51:19lead project size requirements. Without
  1217. 51:23fulfilling those three MPRs, a project
  1218. 51:25cannot qualify for a lead certification.
  1219. 51:28And this is applicable to all rating
  1220. 51:30systems. Period. When going through the
  1221. 51:33MPR section, please make sure you
  1222. 51:35thoroughly know them for the exam
  1223. 51:37purposes. After the project complies
  1224. 51:40with the MPRs, now it's time to comply
  1225. 51:43with the requirements of the selected
  1226. 51:45rating system. There are two things a
  1227. 51:47project should accomplish under each
  1228. 51:49rating system. The first thing is to
  1229. 51:51satisfy all the prerequisites of that
  1230. 51:54rating system. You can think about them
  1231. 51:56like MPRs inside each rating system. And
  1232. 52:00without achieving all of the
  1233. 52:02prerequisites, a project cannot achieve
  1234. 52:04a lead certification.
  1235. 52:06The second thing a project should do is
  1236. 52:09to collect points by achieving credits
  1237. 52:11of that rating system. Minimum 40 points
  1238. 52:14out of 100 is required for a lead
  1239. 52:17certification.
  1240. 52:19All lead rating systems are scored out
  1241. 52:21of 100 total points and 40 points is the
  1242. 52:25minimum points to become lead certified
  1243. 52:27which is the base level. Please note
  1244. 52:29that prerequisites do not award any
  1245. 52:32points only credits do. Every credit has
  1246. 52:36a different requirement and every credit
  1247. 52:38awards some points. Project teams decide
  1248. 52:42on choosing the credits they want to
  1249. 52:43pursue preferably during the beginning
  1250. 52:46of the project. There are approximately
  1251. 52:4970 credits under the lead building
  1252. 52:51design plus construction rating systems
  1253. 52:54and each has different point values.
  1254. 52:56After achieving the chosen credits, this
  1255. 52:59time the projects need to prepare some
  1256. 53:01documentation to show that they have
  1257. 53:03achieved their MPRs prerequisites and
  1258. 53:06enough credits and basically upload it
  1259. 53:09to lead online. Done. To summarize, in
  1260. 53:13order to achieve a lead certification,
  1261. 53:16there are the three MPRs with which
  1262. 53:18every project must comply regardless of
  1263. 53:21the rating system. Then there are
  1264. 53:23prerequisites of each rating system that
  1265. 53:26are mandatory to achieve for lead
  1266. 53:27certification. Then the project team
  1267. 53:30must choose credits to pursue and
  1268. 53:33collect more than 40 points and all
  1269. 53:35should be documented. What if a project
  1270. 53:38satisfies all the MPRs prerequisites and
  1271. 53:42gets a total of 80 points? Then it will
  1272. 53:45be more than lead certified and will be
  1273. 53:47given a lead platinum certificate.
  1274. 53:50According to the total number of points
  1275. 53:51a project receives, lead certification
  1276. 53:54levels are determined. For the base
  1277. 53:57certification level, which is called
  1278. 53:59leadcertified, projects need to earn
  1279. 54:01between 40 to 49 points. For lead silver
  1280. 54:06certification, projects need to earn
  1281. 54:08between 50 to 59 points. For lead gold
  1282. 54:12certification, projects need to earn
  1283. 54:15between 60 to 79 points. And for lead
  1284. 54:19platinum certification, projects need to
  1285. 54:22earn at least 80 points.
  1286. 54:24Knowing the points required for each
  1287. 54:26level of lead certification is essential
  1288. 54:29for the exam.
  1289. 54:31But if a project achieves all of the
  1290. 54:33MPRs, earns 90 points, but misses only
  1291. 54:37one prerequisite, no lead certification
  1292. 54:40will be awarded. To see the complete
  1293. 54:43list of prerequisites and credits and
  1294. 54:45the credits point values, it's
  1295. 54:47recommended to review the lead
  1296. 54:49scorecard. Please review the scorecard
  1297. 54:52carefully as some features of it can be
  1298. 54:54asked on the exam.
  1299. 54:56Lead scorecard or lead checklist is an
  1300. 55:00important document which a project can
  1301. 55:02choose the credits to be pursued and see
  1302. 55:05if the total expected points will be
  1303. 55:07enough to achieve the aimed level of
  1304. 55:09lead certification
  1305. 55:11for all the lead building design plus
  1306. 55:14construction rating systems. The
  1307. 55:16prerequisites and credits are
  1308. 55:18categorized under nine categories which
  1309. 55:21are also called the credit categories.
  1310. 55:23We will discuss each credit category in
  1311. 55:26depth in the following sections. But to
  1312. 55:28summarize, the lead BD plus C credit
  1313. 55:31categories are integrative process,
  1314. 55:35location and transportation, sustainable
  1315. 55:38sites, water efficiency, energy and
  1316. 55:41atmosphere, which is also the credit
  1317. 55:43category containing the highest points
  1318. 55:46with 33 points. materials and resources,
  1319. 55:50indoor environmental quality,
  1320. 55:52innovation, and regional priority.
  1321. 55:56But did you notice that there are 110
  1322. 55:59total points available? Just like some
  1323. 56:02exams have bonus questions, lead has 10
  1324. 56:05bonus points. Innovation credit category
  1325. 56:09awards six bonus points while the
  1326. 56:12regional priority credit category awards
  1327. 56:14four bonus points in lead. But still
  1328. 56:17every project will be scored out of 100
  1329. 56:21points not 110. And now let us take a
  1330. 56:25closer look at the lead rating systems.
  1331. 56:28Just like individuals have credentials
  1332. 56:30like lead green associate or lead AP,
  1333. 56:33all the lead projects are certified
  1334. 56:35according to a lead rating system. All
  1335. 56:38the lead rating systems are grouped
  1336. 56:40under five broad categories depending on
  1337. 56:43their construction types. One, lead for
  1338. 56:46building design and construction or lead
  1339. 56:49BD plus C. Two, lead for interior design
  1340. 56:54and construction or lead ID plus C.
  1341. 56:57Three, lead building operations and
  1342. 57:00maintenance or lead O plus M. Four, lead
  1343. 57:05for neighborhood development or lead ND.
  1344. 57:08And five, lead for homes. And under
  1345. 57:12these categories, rating systems are
  1346. 57:15differentiated based on their space
  1347. 57:17usage type in order to address specific
  1348. 57:19needs of different project types. The
  1349. 57:22rating systems under lead for building
  1350. 57:24design and construction are new
  1351. 57:27construction and major renovation, core
  1352. 57:30and shell development, schools, retail,
  1353. 57:34data centers, warehouses and
  1354. 57:36distribution centers, hospitality and
  1355. 57:39healthcare. The rating systems under
  1356. 57:42lead for interior design and
  1357. 57:44construction are commercial interiors,
  1358. 57:48retail and hospitality.
  1359. 57:51The rating systems under lead building
  1360. 57:53operations and maintenance are existing
  1361. 57:56buildings, retail, schools, hospitality,
  1362. 58:01data centers, and warehouses and
  1363. 58:04distribution centers. The rating systems
  1364. 58:07under lead for neighborhood development
  1365. 58:09are lead ND plan and lead ND built
  1366. 58:14project.
  1367. 58:16And at last, the rating systems under
  1368. 58:19lead for homes are homes and multifamily
  1369. 58:22low-rise and multifamily midrise.
  1370. 58:26Projects can also choose to use the
  1371. 58:28rating system selector inside lead
  1372. 58:30online, which helps project teams to
  1373. 58:33choose the most appropriate system for
  1374. 58:35their project. Some projects may also
  1375. 58:38seem appropriate for more than one
  1376. 58:39rating system. Think about a 40story
  1377. 58:42high-rise building project which
  1378. 58:44contains a hotel in the first 20 floors
  1379. 58:47and residential units on the floors
  1380. 58:49above 20. Half of the building can be
  1381. 58:52rated under lead BD plus C hospitality
  1382. 58:56while the other half can be rated under
  1383. 58:57lead BD plus C new construction and
  1384. 59:00major renovation.
  1385. 59:02But in lead projects cannot be divided
  1386. 59:05into different rating systems as per
  1387. 59:07sections and the whole project should be
  1388. 59:10certified under one rating system. If
  1389. 59:14more than one rating system seems
  1390. 59:15applicable to a project, the 4060 rule
  1391. 59:19will be used to decide on the rating
  1392. 59:21system, which is the next topic.
  1393. 59:24The 4060 rule is used to choose the
  1394. 59:27appropriate rating system for the
  1395. 59:29project if the project seems to fit
  1396. 59:31under multiple rating systems. In the
  1397. 59:344060 rule, a project should be divided
  1398. 59:37into sections according to the
  1399. 59:38appropriate rating system each section
  1400. 59:40fits. Then the total floor area
  1401. 59:43corresponding to each rating system
  1402. 59:45should be calculated. If the total floor
  1403. 59:48area of one of the applicable rating
  1404. 59:50system is less than 40% of the project's
  1405. 59:53total floor area, that rating system
  1406. 59:56cannot be used. If the total floor area
  1407. 59:59of one of the applicable rating system
  1408. 1:00:01is more than 60% of the project's total
  1409. 1:00:04floor area, that rating system must be
  1410. 1:00:06used. If it falls between 40 and 60%
  1411. 1:00:11then the project teams can decide on the
  1412. 1:00:13rating system to be used for the
  1413. 1:00:15project. Let's consider the 40story
  1414. 1:00:18high-rise building project example in
  1415. 1:00:20the previous topic which contains a
  1416. 1:00:22hotel in the first 20 floors and
  1417. 1:00:25residential units on the floors above
  1418. 1:00:2720. Since 50% of the project's total
  1419. 1:00:30area is appropriate for one rating
  1420. 1:00:33system and the other 50% is appropriate
  1421. 1:00:35for the other, the project teams will
  1422. 1:00:38decide which rating system to use. This
  1423. 1:00:41time the project teams can look at the
  1424. 1:00:43requirements of lead BD plus C
  1425. 1:00:45hospitality and lead BD plus C new
  1426. 1:00:49construction and major renovation to
  1427. 1:00:51decide on the rating system they will
  1428. 1:00:53pursue. USGBC may ask the project teams
  1429. 1:00:57to change their rating system if not
  1430. 1:00:59chosen adequately.
  1431. 1:01:02The minimum program requirements or in
  1432. 1:01:05short MPRs are the minimum standards and
  1433. 1:01:08characteristics that every lead project
  1434. 1:01:10should meet to pursue lead
  1435. 1:01:12certification.
  1436. 1:01:14MPR state if a project can pursue lead
  1437. 1:01:17certification or not. They provide
  1438. 1:01:19guidance on the types of projects that
  1439. 1:01:21are eligible for lead certification.
  1440. 1:01:24protect the integrity of the lead
  1441. 1:01:25program and reduce the number of issues
  1442. 1:01:28that arise during the certification
  1443. 1:01:30process. They define the types of
  1444. 1:01:32buildings, spaces, and neighborhoods
  1445. 1:01:35that a lead rating system is designed to
  1446. 1:01:37evaluate.
  1447. 1:01:38There are three MPRs.
  1448. 1:01:41MPR number one, every project must be in
  1449. 1:01:44a permanent location on existing land. A
  1450. 1:01:48project that is designed to move at any
  1451. 1:01:50point in its lifetime is not eligible
  1452. 1:01:52for lead certification.
  1453. 1:01:54Since the significant portion of lead's
  1454. 1:01:56credits are dependent on the project's
  1455. 1:01:58location, the certification is awarded
  1456. 1:02:01according to that particular location.
  1457. 1:02:04Prefabricated or modular structures can
  1458. 1:02:06be leadcertified as long as they are
  1459. 1:02:08installed permanently. It is important
  1460. 1:02:11to locate the projects on existing land
  1461. 1:02:13to avoid artificial land masses which
  1462. 1:02:16can displace and disrupt ecosystems in
  1463. 1:02:19the future. MPR number two projects must
  1464. 1:02:24use reasonable lead boundaries. The lead
  1465. 1:02:27project boundary must include all
  1466. 1:02:29contiguous land that is associated with
  1467. 1:02:31the project and support its typical
  1468. 1:02:33operations.
  1469. 1:02:35These will include the landscaping,
  1470. 1:02:37septic or storm water treatment
  1471. 1:02:39equipment, parking, sidewalks, and even
  1472. 1:02:41more. Any project space cannot be shown
  1473. 1:02:45excluded in order to give the project an
  1474. 1:02:47advantage in complying with credit
  1475. 1:02:49requirements. In addition, the gross
  1476. 1:02:52floor area of the lead project should
  1477. 1:02:54not be less than 2% of the gross land
  1478. 1:02:57area within the lead project boundary.
  1479. 1:02:59The lead project boundary is defined by
  1480. 1:03:02the platted property line of the project
  1481. 1:03:04including all land and water within it.
  1482. 1:03:07And according to MPR number three,
  1483. 1:03:10projects must comply with project size
  1484. 1:03:12requirements. All lead projects must
  1485. 1:03:15meet the following size requirements
  1486. 1:03:17according to their rating system. For
  1487. 1:03:20lead BD plus C and lead O plusm rating
  1488. 1:03:23systems, projects must include minimum
  1489. 1:03:261,000 square ft or 93 square me gross
  1490. 1:03:30floor area. For lead ID plus C rating
  1491. 1:03:33systems, projects must include minimum
  1492. 1:03:36250 ft or 22 square me gross floor area.
  1493. 1:03:41For lead for neighborhood development
  1494. 1:03:43rating systems, projects should contain
  1495. 1:03:45at least two habitable buildings and be
  1496. 1:03:48no larger than500 acres. And for lead
  1497. 1:03:52for homes, projects must be defined as a
  1498. 1:03:54dwelling unit by all applicable codes. A
  1499. 1:03:58dwelling unit should include permanent
  1500. 1:04:00provisions for living, sleeping, eating,
  1501. 1:04:02cooking, and sanitation. The lead for
  1502. 1:04:05homes project should also refer to the
  1503. 1:04:07lead for homes scope and eligibility
  1504. 1:04:10guidelines as well.
  1505. 1:04:14Whether deciding to pursue lead
  1506. 1:04:15certification or not, all projects
  1507. 1:04:18should first take a look at the MPRs to
  1508. 1:04:20see if their project can be eligible for
  1509. 1:04:22a lead certification. Then the project
  1510. 1:04:25teams will need to determine the rating
  1511. 1:04:27system that their project fits into.
  1512. 1:04:30After the rating system is selected,
  1513. 1:04:32project team should evaluate the
  1514. 1:04:34prerequisites and credits of that rating
  1515. 1:04:36system. Prerequisites are the minimum
  1516. 1:04:39requirements that all buildings under a
  1517. 1:04:41certain rating system must meet in order
  1518. 1:04:44to achieve lead certification.
  1519. 1:04:46For example, all the projects that are
  1520. 1:04:48certified under the lead BD plus C
  1521. 1:04:51healthcare rating system must meet all
  1522. 1:04:53the prerequisites of that rating system.
  1523. 1:04:56While a project registered under LEA
  1524. 1:04:58lead O plusM retail must meet all of its
  1525. 1:05:01prerequisites.
  1526. 1:05:03To illustrate, let's take a look at one
  1527. 1:05:05of the prerequisites under the lead BD
  1528. 1:05:08plus C new construction and major
  1529. 1:05:10renovation rating system, which is in
  1530. 1:05:12this case the fundamental refrigerant
  1531. 1:05:15management prerequisite. Briefly, this
  1532. 1:05:18prerequisite requires that the projects
  1533. 1:05:20do not use CFCbased refrigerants in
  1534. 1:05:23their HVACR systems.
  1535. 1:05:26Therefore, every project under this
  1536. 1:05:28rating system will not use any CFCbased
  1537. 1:05:31refrigerants. Period. Any project that
  1538. 1:05:34cannot meet this requirement will not be
  1539. 1:05:37eligible for a lead certification.
  1540. 1:05:39While projects can pick and choose the
  1541. 1:05:41credits they want to pursue,
  1542. 1:05:43prerequisites are mandatory. Fulfilling
  1543. 1:05:46the requirements of prerequisites will
  1544. 1:05:48also not award any points.
  1545. 1:05:51Now let's take a look at the credits
  1546. 1:05:54which are also a part of each rating
  1547. 1:05:55system. Projects are free to go for any
  1548. 1:05:58credit they want within the selected
  1549. 1:06:00rating system. Each credit has
  1550. 1:06:03requirements to be fulfilled and once
  1551. 1:06:05the requirements are met, the project
  1552. 1:06:07will earn points. The higher the total
  1553. 1:06:10points a project earns means a higher
  1554. 1:06:13level of lead certification will be
  1555. 1:06:15awarded. To illustrate a credit, let's
  1556. 1:06:18take a look at one of the credits under
  1557. 1:06:20the lead BD plus C new construction and
  1558. 1:06:23major renovation rating system, which is
  1559. 1:06:25in this case the access to quality
  1560. 1:06:28transit credit. Briefly, this credit
  1561. 1:06:31requires the project to be located
  1562. 1:06:33within walking distance to public
  1563. 1:06:35transportation to reduce greenhouse gas
  1564. 1:06:38emissions resulting from single
  1565. 1:06:40occupancy vehicle use. Hence, any lead
  1566. 1:06:43BD plus C new construction and major
  1567. 1:06:46renovation project located at a walking
  1568. 1:06:48distance to public transportation will
  1569. 1:06:51earn points under this credit. Projects
  1570. 1:06:53that do not comply with this credit will
  1571. 1:06:55not receive any points. As mentioned,
  1572. 1:06:58there are 100 total points allocated to
  1573. 1:07:01the credits under each rating system.
  1574. 1:07:03Plus, there are 10 bonus points. A
  1575. 1:07:07project that earns 50 points in total
  1576. 1:07:09will receive a lead silver while another
  1577. 1:07:12project that earns 80 points will
  1578. 1:07:14receive lead platinum if both of them
  1579. 1:07:17additionally satisfied all the
  1580. 1:07:19prerequisites and the MPRs. The
  1581. 1:07:22prerequisites and credits are also
  1582. 1:07:24categorized as design or construction
  1583. 1:07:27prerequisites or credits according to
  1584. 1:07:30the project phase they are performed in.
  1585. 1:07:32For example, the mentioned access to
  1586. 1:07:35quality transit credit is a design
  1587. 1:07:37credit since the project's location will
  1588. 1:07:40not be decided during the construction
  1589. 1:07:42phase.
  1590. 1:07:43Other than the prerequisites and
  1591. 1:07:45credits, there are also pilot credits
  1592. 1:07:48which are credits being tested for the
  1593. 1:07:50updated version of lead. And according
  1594. 1:07:52to the feedback received by USGBC, these
  1595. 1:07:56pilot credits can become actual credits
  1596. 1:07:58of the updated lead rating system, which
  1597. 1:08:01would be lead V5. Pursuing any pilot
  1598. 1:08:04credit is optional to team members. But
  1599. 1:08:07if the project chooses to earn a pilot
  1600. 1:08:09credit, bonus points will be awarded.
  1601. 1:08:12The points will be awarded under the
  1602. 1:08:14innovation credit which is located under
  1603. 1:08:17the innovation credit category that we
  1604. 1:08:19will discuss in the later sections.
  1605. 1:08:22Project teams can find the pilot credits
  1606. 1:08:24that are available to each rating system
  1607. 1:08:27from the lead pilot credit library on
  1608. 1:08:29the USGBC's website.

About this transcript

This page contains the full transcript of LEED Green Associate Exam Prep Course by Projectific, generated from the public captions YouTube serves with the video. The transcript has 9,254 words across 1,608 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.