- 0:00According
- 0:02[music]
- 0:14to the US Environmental Protection
- 0:16Agency, EPA, green building is the
- 0:19practice of creating structures and
- 0:21using processes that are environmentally
- 0:24responsible and resource efficient
- 0:26throughout a building's life cycle, from
- 0:28sighting to design, construction,
- 0:30operation, maintenance, renovation, and
- 0:33deconstruction.
- 0:35This practice expands and complements
- 0:37the classical building design concerns
- 0:39of economy, utility, durability, and
- 0:42comfort. Green building is also known as
- 0:45a sustainable or high-performance
- 0:47building. Green buildings are more
- 0:50environmentally sensitive, provide more
- 0:52comfort to building occupants, and also
- 0:54remain resource efficient and high
- 0:56performance buildings throughout their
- 0:58entire life cycle. But how does that
- 1:00happen? The answer will be explained
- 1:03throughout this whole course. However,
- 1:05to highlight the major concept of green
- 1:07buildings, we must first observe the
- 1:09natural system. In the natural cycle,
- 1:12there isn't any waste. Even what we term
- 1:15animal waste is actually a sustainable
- 1:17product which is an organic fertilizer
- 1:19in agriculture that improves plant
- 1:21nutrition and assists the growth of
- 1:23plants. The key factor of animal waste
- 1:26is its sustainability.
- 1:28It is produced by nature and is
- 1:30continuously reused in a never-ending
- 1:32loop. Nevertheless, is the waste of
- 1:35man-made products also that? Think about
- 1:38a plastic bag which takes about 500
- 1:41years to break down in the environment
- 1:43and creates a great deal of
- 1:44environmental harm during its lifetime.
- 1:48And now let us think about the built
- 1:50environment which refers to all the
- 1:52man-made surroundings that are needed
- 1:54for human activity from roads to
- 1:56buildings to neighborhoods.
- 1:59We use most of the world's resources to
- 2:01develop our built environments. But do
- 2:03they end up like the plastic bag or can
- 2:05they continue in nature?
- 2:08Green building is really a system that
- 2:10evolves by continuously enhancing its
- 2:12level of performance in order to get as
- 2:15close as possible to the natural system,
- 2:17which is by far the most efficient
- 2:19system known to man.
- 2:22There is not a single building in the
- 2:23world that does not have an impact on
- 2:25the environment. That being said, the
- 2:28way we build can make a great
- 2:29contribution towards reducing this
- 2:31impact. In the United States, buildings
- 2:34account for 14% of potable water
- 2:37consumption, 30% of waste output, 40% of
- 2:42raw materials use, 38% of carbon dioxide
- 2:46emissions, 24 to 50% of energy use, and
- 2:5172% of electricity consumption. With 38%
- 2:55of the carbon dioxide emissions,
- 2:57buildings are on the top of the list and
- 3:00produce even more carbon dioxide than
- 3:02transportation and industrial, which is
- 3:05also important to know for the exam
- 3:06purposes. And all the built environment
- 3:09contributes to 67% of all greenhouse gas
- 3:12emissions. But why do our buildings harm
- 3:15the environment? First, when we clear
- 3:18the land to make way for a development,
- 3:20the wildlife habitat in that area is
- 3:22destroyed and the pre-existing permeable
- 3:25soil becomes an impermeable surface.
- 3:28Second, we manufacture building products
- 3:31that pollute water, air, release toxic
- 3:34chemicals, and emit greenhouse gases.
- 3:37Furthermore, during the building
- 3:39operations phase, the building consumes
- 3:41energy, which further increases
- 3:43greenhouse gas emissions and adds to
- 3:46potable water consumption, which later
- 3:48becomes a waste product. With the
- 3:50commuting of building users and visitors
- 3:52to the building, the use of single
- 3:55occupancy vehicles results in increased
- 3:57energy consumption and greenhouse gas
- 4:00emissions. The list of aspects related
- 4:02to environmental impact is seemingly
- 4:04endless.
- 4:06And now let's take a look at the
- 4:08benefits of green buildings. When
- 4:10looking at the statistics of green
- 4:11buildings, a study by the new buildings
- 4:14institute found that average energy use
- 4:16intensity of green buildings are 24%
- 4:19lower when compared to typical
- 4:21buildings. Additionally, US General
- 4:24Services Administration survey among 12
- 4:27green buildings state that green
- 4:29buildings accomplish 26% energy use
- 4:33reduction, 27% higher levels of occupant
- 4:36satisfaction,
- 4:3813% lower maintenance costs and 33%
- 4:42lower carbon dioxide emissions.
- 4:45Occupants of green buildings are exposed
- 4:47to far lower levels of indoor pollutants
- 4:50and have higher air, lighting, and
- 4:52acoustical qualities. According to the
- 4:55US Environmental Protection Agency,
- 4:57people in the United States spend on
- 4:59average 90% of their time indoors, which
- 5:03means that developing green buildings
- 5:05will make a serious contribution to the
- 5:07health and comfort of the building
- 5:08occupants as well as to their
- 5:10productivity. Regenerative design is
- 5:13also an important aspect to mention that
- 5:16can be seen to be one step ahead of
- 5:18sustainable design. Regenerative design
- 5:21is a type of building design that
- 5:23creates no waste and provides more
- 5:25output than consumed input. As
- 5:28regenerative design projects do not use
- 5:30any more energy than they produce, they
- 5:33are able to return the excess energy to
- 5:35the utility. Please note that these
- 5:37types of projects which only use their
- 5:40own generated energy are also called net
- 5:42zero energy projects. In addition to
- 5:46their sustainable features, regenerative
- 5:48design projects can also contribute to
- 5:50the restoration of the lost environment
- 5:52and habitat thereby taking regenerative
- 5:55design one step ahead of sustainable
- 5:58design.
- 5:59All green buildings should establish
- 6:01three components. One, economic
- 6:04prosperity, which represents the profit.
- 6:07Two, social responsibility, which
- 6:10represents the people, and three,
- 6:12environmental stewardship, which
- 6:14represents our planet. These three
- 6:17components are called the triple bottom
- 6:19line. A commitment to the triple bottom
- 6:22line means looking beyond a project's
- 6:24profitability or considering more than
- 6:26just a project's sustainable features or
- 6:29social responsibility.
- 6:31When developing a green building, the
- 6:33main goal is to establish all three
- 6:35components at the same time. A green
- 6:38building should have an increased value
- 6:40and environmentally friendly design and
- 6:42should also serve well to its users and
- 6:45the community. To illustrate the
- 6:47concept, let's assess the triple bottom
- 6:49line of a skylight that will be
- 6:51installed on the roof of an office
- 6:53space. A skylight will reduce the energy
- 6:56consumed by lighting fixtures, which
- 6:58will reduce greenhouse gas emissions.
- 7:01Less energy usage will also mean less
- 7:03operating costs and natural daylight
- 7:06will create a healthier office space for
- 7:08workers. If we are able to address and
- 7:11achieve all three components of the
- 7:13triple bottom line, why not install the
- 7:16skylight?
- 7:18The primary greenhouse gases in the
- 7:20Earth's atmosphere are water vapor,
- 7:22carbon dioxide, nitrous oxide, methane,
- 7:26and ozone. Each of them are essential to
- 7:29absorb and emit radiation and without
- 7:32them the average temperature of the
- 7:34earth's surface would be much colder
- 7:35than it is now. However, with the
- 7:38increasing concentration of carbon
- 7:40dioxide in the atmosphere, which is the
- 7:43result of human activity, the greenhouse
- 7:45gas balance was disturbed. This increase
- 7:48became the number one cause for global
- 7:51climate change. As the greenhouse gas
- 7:53emissions increase, an even larger
- 7:56buildup of carbon dioxide occurs in the
- 7:58atmosphere, thus warming the climate
- 8:00further. As discussed, the built
- 8:03environment contributes to 67% of all
- 8:07greenhouse gas emissions. This comes
- 8:09from building systems and energy use,
- 8:12transportation, water use, changes in
- 8:15the land cover, building products, and
- 8:17construction.
- 8:19Although changing the way we build will
- 8:21play a significant role in reducing the
- 8:23greenhouse gas emissions, merely
- 8:25developing green buildings will not be
- 8:27enough. To establish a lower carbon
- 8:30rate, we need to develop green
- 8:32communities as well. The first thing
- 8:34that a green community should implement
- 8:37is the reduction of the distances that
- 8:39vehicles travel. The buildings in the
- 8:41suburban areas, even if they are green
- 8:43buildings, create greenhouse gas
- 8:46emissions due to the long distances that
- 8:48people drive every day.
- 8:51Additionally, emissions from
- 8:52transportation make up half of the total
- 8:55emissions associated with the project.
- 8:58This also means that the project
- 8:59location is another critical factor to
- 9:02consider when developing a green
- 9:03building. The lead for neighborhood
- 9:06development rating system is designed to
- 9:08establish green communities which will
- 9:11be discussed in later chapters. To take
- 9:14our discussion to the next level, we
- 9:16will now discuss the common sources of
- 9:18greenhouse gas emissions. This table is
- 9:21also important to know for the exam
- 9:23purposes. The sources of greenhouse gas
- 9:26emissions are grouped under three
- 9:28scopes. A scope one energy relates to
- 9:31the direct energy from the owned or
- 9:33controlled sources while a scope 2
- 9:36energy relates to the purchased energy
- 9:39and scope 3 energy relates to energy
- 9:41sources that are not owned or directly
- 9:44controlled. To illustrate, the energy
- 9:47generated on site through burning of
- 9:49fossil fuels will fall under scope one
- 9:51energy and the resulting greenhouse gas
- 9:54emissions will be classified as a scope
- 9:56one emission
- 9:58or the electricity bought from a utility
- 10:01company will be classified as a scope 2
- 10:03energy and the resulting greenhouse gas
- 10:05emission will be a scope 2 emission.
- 10:11The green building process is very
- 10:13different compared to the conventional
- 10:15building process. While the conventional
- 10:17building process focuses on the
- 10:19snapshots, the green building process
- 10:22looks at the project as a whole. There
- 10:24are three major concepts integral to
- 10:26green buildings that are not a part of
- 10:28the conventional building process. These
- 10:31are systems thinking, life cycle
- 10:34thinking and the integrated process. As
- 10:37all the buildings are composed of
- 10:39different interrelated systems that form
- 10:41a hole, each of them has an impact on
- 10:44others. Consider a building envelope and
- 10:47an HVAC system. The insulation level
- 10:50that a building envelope provides will
- 10:52affect the size and the operating cost
- 10:54of the HVAC. The better the insulation,
- 10:57the smaller the HVAC will be, which will
- 11:00also mean lower operating costs.
- 11:04While a proper waterproofing membrane on
- 11:06the building foundation will protect the
- 11:08foundation and affect the durability of
- 11:10the whole building, this will also
- 11:12result in less humidity inside the
- 11:14building which will affect both the HVAC
- 11:16system and the health of the building
- 11:18occupants.
- 11:20The systems of a building include
- 11:22resources, materials, energy, building
- 11:26occupants and information. The term
- 11:29systems thinking refers to the
- 11:31understanding of each and every system
- 11:33of a building while also understanding
- 11:35their relationships and looking at the
- 11:37project as a whole. The second major
- 11:40concept of sustainable thinking concerns
- 11:42the life cycle approach which evaluates
- 11:45the entire life of a project product or
- 11:48service. For example, when selecting a
- 11:50building product, the project teams need
- 11:53to ask the following questions. What is
- 11:55the raw material of the product? Was it
- 11:58extracted in a responsible manner? How
- 12:01long can the product be used? What will
- 12:03happen to the product once its useful
- 12:05life ends? Does this product harm the
- 12:08environment? And more. Integrated
- 12:11process, which is the third major
- 12:13concept of sustainable thinking,
- 12:15emphasizes the importance of connection
- 12:18and communication among all the
- 12:20professionals and stakeholders in the
- 12:22project. To be able to see the big
- 12:25picture, all the different teams in the
- 12:27project should act as a single team. The
- 12:30stakeholders, architects, engineers, and
- 12:32facility managers should work
- 12:34collaboratively starting from the
- 12:36pre-esign phase of the project so that
- 12:38each team member can understand the
- 12:40perspectives and strategies of the rest
- 12:43of the team. This will enable better
- 12:45decisions to be made and assist in
- 12:47creating a high performance building. In
- 12:50the following sections, we will take a
- 12:52closer look at these three major green
- 12:54building concepts.
- 12:58The main idea behind systems thinking is
- 13:00to see that the systems in the building
- 13:02do not work in isolation.
- 13:05Actually, there is not a single system
- 13:07in our universe that works in isolation.
- 13:09Everything is interconnected.
- 13:12In order to effectively understand
- 13:14systems thinking, we need to understand
- 13:16the types of systems. There are two
- 13:18types of systems. The first type is open
- 13:21systems which are systems that
- 13:23constantly consume other items, use them
- 13:26and produce waste at the end. A whole
- 13:28city may be an example of this as it
- 13:31imports food, energy and products.
- 13:34However, while a city uses products, it
- 13:37also produces wastes in turn often in
- 13:40the form of sewage, pollution and solid
- 13:42waste which consequently marks the end
- 13:45of the system. There are no feedback
- 13:48loops in the open systems. However, in
- 13:51nature, everything is in a loop and thus
- 13:54no open system exists. Therefore, this
- 13:57is called a closed system which does not
- 14:00produce any waste product at the end.
- 14:03The system continues independently.
- 14:06Think about the water cycle in our
- 14:07world. The sun heats and evaporates the
- 14:10water on the oceans and the seas and
- 14:12then creates water vapor. The resulting
- 14:15water vapor rises in air, which
- 14:17condenses into rain and goes back to the
- 14:20Earth's surface. That water then becomes
- 14:23underground water, which again joins the
- 14:25oceans and seas with the flow. This
- 14:28sustainable cycle does not end. Finding
- 14:32ways to develop closed systems in our
- 14:34buildings will result in creating
- 14:36sustainable buildings. In order to
- 14:38establish that, we need to evaluate the
- 14:41individual elements in addition to their
- 14:43relationships to each other as a whole.
- 14:45When designing our buildings, a decision
- 14:48made for an individual element will have
- 14:51a ripple effect that will affect other
- 14:52elements and systems. Remember the
- 14:55example about installing a proper
- 14:57waterproofing membrane on the building
- 14:59foundation which affects the foundation,
- 15:02the durability of the whole building,
- 15:04the humidity level inside the building,
- 15:06the HVAC system and the health of the
- 15:09building occupants.
- 15:12Understanding the emergent properties of
- 15:14systems is also essential in order to
- 15:16better evaluate why we need to form
- 15:19systems. Every system is a composition
- 15:22of its individual parts. Let us take the
- 15:24human body as an example in which cells
- 15:27form tissues. Tissues form organs.
- 15:30Organs form the organ systems and organ
- 15:33systems form humans. A lung is made up
- 15:36of cells. However, having only lung
- 15:39cells together will not do anything. The
- 15:42whole system needs to be there. Certain
- 15:44properties emerge as the result of
- 15:46interaction of individual elements.
- 15:49These are called emergent properties of
- 15:51the systems and only systems can have
- 15:54emergent properties not the individuals.
- 15:58The breathing function of the lung is
- 16:00the emergent property of a whole
- 16:02successful system.
- 16:04This is why systems thinking requires
- 16:06the creation of emergent properties to
- 16:09achieve awarding outcomes. To take the
- 16:12discussion to the next level, we will
- 16:14now examine feedback loops followed by
- 16:17leverage points.
- 16:19Feedback loops refer to the flow of
- 16:21information within a system that allows
- 16:23the system to take action. There are two
- 16:25types of feedback loops in systems,
- 16:28positive and negative. A positive
- 16:31feedback loop can be summarized as A
- 16:34producing B, which in turn produces more
- 16:37of A. An example of this would be an
- 16:40interest earning savings account. As the
- 16:42account grows, more interest is earned,
- 16:45which in turn brings further account
- 16:46growth.
- 16:48In negative feedback loops, a change
- 16:51brings an additional change in the
- 16:52opposite direction. If a room gets
- 16:55warmer than the set temperature, the
- 16:57thermostat will send a signal to the air
- 16:59conditioning and the air conditioning
- 17:01will stop blowing warm air.
- 17:03Understanding these feedback loops is
- 17:05crucial for designing sustainable
- 17:07buildings and neighborhoods. With the
- 17:10feedback loops providing the flow of
- 17:12information, the system can take action
- 17:14when there's a problem. Since the
- 17:17positive feedback loops don't stop, they
- 17:20may create problems in the systems if
- 17:22they're unchecked. However, if the
- 17:25positive feedback loops are checked with
- 17:27the negative feedback loops, the system
- 17:29can stop if there is too much of
- 17:31something. With the current technology,
- 17:34both feedback loops can be implemented
- 17:36by the use of sensors, controls,
- 17:39building automation systems, and more. A
- 17:42building automation system can show
- 17:44building management the excess energy
- 17:46usage statistics by tracking the
- 17:49individual consumption of all the
- 17:51building systems.
- 17:52Equipped with only this information, the
- 17:55building management can then respond and
- 17:58try to discover ways to reduce the
- 18:00energy use. This is called the Prius
- 18:03effect, which means that users can
- 18:05respond to something only if they have
- 18:07realtime information about it. And now
- 18:10we will continue our discussion with
- 18:12leverage points. A small change can
- 18:15yield big changes. In other words, any
- 18:18action taken in a leverage point of the
- 18:21system can bring about significant
- 18:23results in the system. Think about a
- 18:25construction site that is located close
- 18:27to a river and that river is the main
- 18:30irrigation source of the surrounding
- 18:32farmlands. If the construction site does
- 18:35not take any action to stop
- 18:36sedimentation and pollution resulting
- 18:39from the construction activities, the
- 18:41whole river can then become
- 18:43contaminated. This will then contaminate
- 18:45the farmlands which will result in
- 18:48contaminated foods. However, by taking
- 18:51action to avoid sedimentation and
- 18:53pollution to the river, which is really
- 18:55a small action when considering the
- 18:57outcome, a whole river can be saved that
- 19:00will also result in saving the farmlands
- 19:03and human health. Being able to see
- 19:06where actions can yield big changes is a
- 19:08very important part of systems thinking,
- 19:11and only by asking questions can project
- 19:14teams thus provide insight to move
- 19:16toward sustainability.
- 19:19The second major concept of sustainable
- 19:22thinking is the life cycle approach.
- 19:25Green buildings need a life cycle
- 19:26approach and project teams should always
- 19:29look at the big picture by evaluating
- 19:31all phases of the project together
- 19:33rather than merely looking at the
- 19:35snapshots. A life cycle of a building
- 19:38covers location selection, design,
- 19:41construction, operations and
- 19:43maintenance, refurbishment, and
- 19:45renovation or demolition. At the very
- 19:48beginning of the project, the project
- 19:50teams need to think about the very last
- 19:52phase of the building, which would be
- 19:54the demolition or complete renovation.
- 19:57Let's consider a wood flooring product
- 20:00that is selected to be used in the
- 20:02project. Project teams need to evaluate
- 20:04the raw material manufacturer of the
- 20:06wood flooring by asking the following
- 20:09questions. Was the wood extracted in a
- 20:12responsible manner? or after cutting
- 20:15trees, does the wood manufacturer plant
- 20:17new trees in order to avoid
- 20:19deforestation?
- 20:21Then the project teams also need to
- 20:23consider the cost and durability of the
- 20:26product as well as evaluating what can
- 20:28happen to the wood flooring after its
- 20:30useful life. Can it be recycled or will
- 20:33it become waste? This practice which
- 20:36investigates materials from their
- 20:38extraction to their disposal is called
- 20:40cradle to grave. In order to avoid
- 20:44waste, closed systems should be formed
- 20:47and a product should become a part of
- 20:49another product after its useful life
- 20:51through recycling or reusing. Evaluating
- 20:54products according to this philosophy is
- 20:57called a cradleto cradle approach which
- 20:59aims to extend the product's life cycle
- 21:01to avoid waste. To examine the
- 21:04environmental cost of a product to
- 21:06nature, the energy consumed resulting
- 21:09from a product's manufacturing,
- 21:11transportation, installation, use, and
- 21:14disposal should also be evaluated.
- 21:17The total energy consumed in all of
- 21:19these stages is called the embodied
- 21:22energy. By way of illustration, think
- 21:25about a marble mined in China,
- 21:28manufactured in Europe, brought to the
- 21:31United States for purchase, and then
- 21:33bought by a project to be used in the
- 21:35building. The embodied energy of that
- 21:38marble will include all the energy
- 21:40consumed for the extraction,
- 21:42manufacture, transportation,
- 21:45installation at the site, and finally
- 21:47the energy needed for disposal. The more
- 21:50embodied energy a product contains will
- 21:53result in more damage to the
- 21:55environment. When deciding on the
- 21:58products to be used in the projects and
- 22:00to support decision-making of the
- 22:02project teams, the life cycle approach
- 22:04should be implemented to environmental
- 22:07considerations with the life cycle
- 22:09assessment LCA and to cost
- 22:12considerations with the life cycle
- 22:14costing LCC.
- 22:17Life cycle assessment evaluates all the
- 22:19environmental effects of a product
- 22:21during the whole lifetime of that
- 22:23material. A cradletograve or cradleto
- 22:26cradle approach is used in LCA and the
- 22:30total energy use and other environmental
- 22:33consequences resulting from the creation
- 22:36of that material is calculated. Hence
- 22:39the benefits of conducting an LCA for
- 22:42the whole building is beneficial to see
- 22:44the trade-offs between different
- 22:46materials and this would also enable
- 22:48selection of the materials that would be
- 22:51the best fit for the project and the
- 22:53environment. Life cycle costing assesses
- 22:56a product's total cost by evaluating
- 22:58both the purchase price and its
- 23:01operating costs. For example, a more
- 23:04expensive but more durable refrigeration
- 23:06system can cost less compared to a less
- 23:09expensive but less durable one. Since
- 23:12the less durable refrigeration system
- 23:15will require more maintenance and will
- 23:17have a shorter lifetime, using that
- 23:20system may result in more expenditure in
- 23:22total to the project owner. Life cycle
- 23:25thinking should be applied to all
- 23:27decisions made in green building, not
- 23:29only to product selection. Setting
- 23:32targets and discovering ways to find the
- 23:34best solutions early in the project can
- 23:36yield great results.
- 23:40The third and final major concept of
- 23:42sustainable thinking is the integrated
- 23:44process which is the key to applying
- 23:46sustainable thinking to real life
- 23:48situations. Remember the example about
- 23:51the system of the human body. The lung
- 23:54is made up of lots of cells. However,
- 23:56when the cells are put together without
- 23:58the whole system in place, these cells
- 24:01cannot perform the breathing function of
- 24:03the lung. Without a working system, an
- 24:05emergent property cannot be created.
- 24:08Assembling project stakeholders,
- 24:10architects, and engineers will not
- 24:13create a successful project. Rather, a
- 24:16system should be formed with the flow of
- 24:18information and collaboration between
- 24:21each member. To better understand the
- 24:23topic, we will now discuss the
- 24:25conventional building process and then
- 24:27continue explaining the details of the
- 24:29integrated building process.
- 24:31In the conventional building process,
- 24:34project teams work in isolation and
- 24:36collaborate when problems occur.
- 24:39Usually, the process starts with a
- 24:41project owner hiring an architectural
- 24:43firm to develop the design. As the
- 24:46design progresses, the architectural
- 24:48firm hires electrical and mechanical
- 24:51designers who then start integrating the
- 24:53electrical and mechanical parts of the
- 24:55design separately. Then construction
- 24:58plans are issued and the owner starts
- 25:00the bidding process. In this phase,
- 25:03different general contractors are
- 25:05requested to bid and once all the bids
- 25:08are submitted, the owner chooses the
- 25:10general contractor and awards the
- 25:11construction of the project. This is
- 25:14called the design bid build process.
- 25:17With this approach, the general
- 25:19contractor was not involved in the
- 25:21design phase at all. And furthermore,
- 25:23they didn't have any collaboration with
- 25:25the architectural firm. In addition,
- 25:28they didn't have any collaboration with
- 25:29the mechanical and electrical designers.
- 25:32During the construction phase, as
- 25:34problems arise, the general contractor
- 25:37will invite the architectural firm. In
- 25:39turn, the architectural firm, if needed,
- 25:42will invite the electrical and
- 25:44mechanical designers to the meetings in
- 25:46order to solve the problems at hand. And
- 25:48the outcome will usually be construction
- 25:50delays and extra project costs.
- 25:54Referring to the human body system
- 25:56example, all the cells were there, but
- 25:58the system was not working.
- 26:04[music]
- 26:10[music]
- 26:16In order to establish an integrated
- 26:18building process, a working system needs
- 26:20to be created and the system should be
- 26:23active as early as possible during the
- 26:25pre-esign phase or even before deciding
- 26:28on the project location. Think about the
- 26:31following questions. How is the climate
- 26:34in the project's location? What type of
- 26:36heating and cooling system should be
- 26:38installed? How should the building be
- 26:41oriented in order to get more sunlight
- 26:43into the building? Is there enough
- 26:45rainfall on the location to capture and
- 26:47use rainwater for irrigation?
- 26:50What are the project owner's goals and
- 26:52requirements?
- 26:54How will the building occupants commute
- 26:56once the project is finished?
- 26:59What are the public transportation
- 27:01options? How will the resources and
- 27:04construction materials be transported to
- 27:06the project site? What are the building
- 27:09code requirements in the project's
- 27:10location? How does energy get to the
- 27:13site? What is the type of soil on site
- 27:17or what type of vegetation exists on
- 27:20site? They're really the type of
- 27:22questions that should be addressed
- 27:23during the earliest phase of the
- 27:25project. This is why the key in the
- 27:28integrated process is to integrate the
- 27:30whole project team early in order to
- 27:33develop an efficient project design and
- 27:35allow the project team to discover
- 27:37strategies. Taking actions late in the
- 27:40process will only result in delays and
- 27:43additional costs. It can also be noticed
- 27:46that most of the previous questions
- 27:48depend on the project's location. To
- 27:51turn the project goals into reality, a
- 27:53strong evaluation of the project
- 27:55location is mandatory. The project
- 27:58location should assist the project teams
- 28:00rather than creating challenges.
- 28:03The preferred sequence is to set the
- 28:06project goals first and then choose the
- 28:08location that best fits to those goals.
- 28:11If the sequencing is vice versa, project
- 28:14teams should still need to search and
- 28:16discover ways to establish project
- 28:17goals. However, they can also face more
- 28:20problems.
- 28:22Understanding the whole community is
- 28:24also essential for successful project
- 28:26integration. If people need to drive
- 28:29single occupancy vehicles to commute to
- 28:31a building, the project will generate
- 28:33greenhouse gas emissions.
- 28:36The climate in the project location is
- 28:38another factor which will impact all the
- 28:40building systems.
- 28:42The soil type will also change according
- 28:45to the location which will affect the
- 28:47whole structural calculation of the
- 28:49building in turn and lead to changes in
- 28:51the whole structural design. As with a
- 28:54weak soil, a building can need a deep
- 28:57foundation. However, this may not be the
- 29:00case with other types of soil. Even the
- 29:03level of the underground water for a
- 29:06particular location can make a huge
- 29:08impact to the design and construction of
- 29:10the basement levels as well as the whole
- 29:13building. When evaluating the site, it
- 29:16is always recommended to work with
- 29:17experts such as hydraologists,
- 29:20engineers, ecologists, and project
- 29:22development consultants
- 29:25evaluating the zoning and local codes,
- 29:28international code council, Americans
- 29:31with Disabilities Act, and all other
- 29:33applicable laws for that location at the
- 29:35beginning of the project is also
- 29:37essential. Most of the mentioned laws
- 29:40will depend on the project's location
- 29:42and they will take precedence over lead
- 29:44requirements. For example, zoning and
- 29:47local codes will determine the building
- 29:49height, type of project to be
- 29:51constructed, size of the building or the
- 29:54minimum parking requirements for a
- 29:56particular location, not lead. Now,
- 30:00let's summarize the main principles of
- 30:02the integrated process. Rule number one,
- 30:06process matters. Or in other words, the
- 30:09system should work efficiently.
- 30:12Rule number two, start early, which
- 30:15means that the system should be active
- 30:17as early as possible. Rule number three,
- 30:20follow through, which really means that
- 30:23the commitment should continue
- 30:25throughout the life of the project. It
- 30:27should not end with the completion of
- 30:29construction in order to ensure the
- 30:31project strategies are maintained and
- 30:34all the building systems are still
- 30:35efficient through the building operation
- 30:37phase. Rule number four, look beyond
- 30:41initial costs to long-term savings.
- 30:45Green strategies have very short payback
- 30:47periods and project stakeholders should
- 30:49be informed that their project will
- 30:51actually cost less in the long run.
- 30:55Rule number five, include and
- 30:58collaborate. The professional project
- 31:00team should work together with the
- 31:02members of the community and always look
- 31:04at the big picture. And to establish a
- 31:07working system among the project team
- 31:09members, stakeholders and members of the
- 31:12community, an iterative process needs to
- 31:15be developed.
- 31:21[music]
- 31:25[music]
- 31:31Founded in the early 1990s and based in
- 31:34Washington DC, US Green Building Council
- 31:38or in short USGBC is a nonprofit
- 31:41organization committed to a sustainable
- 31:44future through cost and energyefficient
- 31:46green buildings. USGBC is made up of
- 31:49tens of thousands of member
- 31:51organizations, chapters, and student and
- 31:54community volunteers.
- 31:56Currently, there are more than 76
- 31:58chapters, 16,000 member organizations,
- 32:01and more than 200,000 lead
- 32:04professionals, which continues to grow.
- 32:07Members of USGBC include engineers,
- 32:10architects, building owners,
- 32:12contractors, facility managers, building
- 32:15product manufacturers, designers,
- 32:17utility managers, college students,
- 32:20college faculties, government agencies,
- 32:22and more. USGBC promotes buildings that
- 32:26are environmentally responsible,
- 32:28profitable, and which support human
- 32:30health. It is also very important to
- 32:34mention USGBC's mission, vision, and
- 32:37guiding principles which are essential
- 32:39to know for the exam. USGBC's mission is
- 32:43to transform the way buildings and
- 32:46communities are designed, built, and
- 32:48operated, enabling an environmentally
- 32:50and socially responsible, healthy, and
- 32:53prosperous environment that improves the
- 32:56quality of life. And USGBC's vision
- 33:00states that buildings and communities
- 33:02will regenerate and sustain the health
- 33:04and vitality of all life within a
- 33:07generation.
- 33:09USGBC accomplishes this mission through
- 33:12LEAD, credentials, Greenbuild
- 33:15International Conference and Expo,
- 33:17education, advocacy, and chapters and
- 33:21committees. LEAD is currently the most
- 33:23widely known and used green building
- 33:26program across the world. While the lead
- 33:29green associate credential as well as
- 33:31the various lead AP credentials offer
- 33:34professionals a designation to help them
- 33:36stand out in the building industry and
- 33:39green build international conference and
- 33:41expo is the world's largest expo
- 33:43dedicated to green building launched in
- 33:462002.
- 33:47And now let's take a look at the guiding
- 33:50principles of USGBC which are
- 33:52establishing leadership, promoting the
- 33:55triple bottom line, maintaining
- 33:57integrity, foster social equity,
- 34:00reconcile humanity with nature, exhibit
- 34:03transparency, and ensuring
- 34:06inclusiveness.
- 34:08And now let's take a closer look at lead
- 34:11green building rating system. LEAD
- 34:14stands for leadership in energy and
- 34:17environmental design which is a system
- 34:20developed by USGBC to certify
- 34:23high-performance buildings and
- 34:25sustainable neighborhoods. Lead green
- 34:28building rating system is a voluntary
- 34:31consensus-based rating system that
- 34:33provides third-party verification that a
- 34:35building or community was designed and
- 34:38built to establish energy savings, water
- 34:41efficiency, location efficiency,
- 34:43improved indoor environmental quality,
- 34:46and stewardship of resources and
- 34:48sensitivity to their impacts. LEAD
- 34:51addresses all building types through
- 34:53different rating systems and evaluates a
- 34:56building's performance throughout the
- 34:57building's life cycle. The creation of
- 34:59the LEAD green building rating system is
- 35:02led by USGBC member-based volunteer
- 35:05committees, subcommittees, and working
- 35:08groups in conjunction with USGBC staff.
- 35:11After development, LEAD's green building
- 35:14rating systems are subject to review and
- 35:17approval by the LEAD steering committee
- 35:19and the USGBC board of directors prior
- 35:22to a vote by USGBC membership. LEAD was
- 35:26created to define green building by
- 35:29establishing a common standard of
- 35:31measurement, promote integrated whole
- 35:34building design practices,
- 35:36recognize environmental leadership in
- 35:38the building industry, stimulate green
- 35:41competition, raise consumer awareness of
- 35:45green building benefits, and transform
- 35:48the building market. The number of
- 35:50leadcertified projects around the world
- 35:52are increasing each day as well as in
- 35:55the United States. US General Services
- 35:58Administration required all new federal
- 36:00government construction projects and
- 36:02renovations to achieve at least lead
- 36:05silver certification and currently
- 36:07requires them to achieve lead gold
- 36:09certification.
- 36:11Another important organization of USGBC
- 36:14to mention is the Green Business
- 36:16Certification Inc. In short, GBCI
- 36:20Green Business Certification, Inc.,
- 36:22which was formerly known as Green
- 36:24Building Certification Institute before
- 36:26changing its name in 2015, is the sister
- 36:30organization of USGBC.
- 36:32GBCI administers the lead building
- 36:35certification and lead professional
- 36:37accredititations.
- 36:39When a project submits all the necessary
- 36:41documents for a lead application, GBCI
- 36:44is the organization that will review the
- 36:46application and determine if all the
- 36:48requirements set forth in a lead rating
- 36:51system is fully met or not. And if the
- 36:54requirements are fulfilled, GBCI will
- 36:57grant the lead certificate.
- 36:59Lead exams are also administered by GBCI
- 37:03and lead professional credentials are
- 37:05awarded according to the exam results.
- 37:08For the exam purposes, knowing the
- 37:10duties of USGBC and GBCI are essential.
- 37:17Leadcertified buildings are proven to be
- 37:19environmentally friendly and respect
- 37:21human health. Additionally, the major
- 37:24benefits of a lead certification can be
- 37:26summarized as money savings over the
- 37:28lifetime of a project, increased project
- 37:31value, and increased building occupant
- 37:34satisfaction.
- 37:35Lead projects are known to be much more
- 37:37energyefficient compared to regular
- 37:39buildings with their low operating
- 37:41costs. The same thing applies for water
- 37:44consumption as leadcertified buildings
- 37:47consume less potable water compared to
- 37:49regular buildings. Leadcertified
- 37:52projects have an increased building
- 37:53value which means more return on
- 37:56investment. Lead is also a great
- 37:58marketing tool for developers which
- 38:00results in high occupancy rates. Since
- 38:03the building systems and leadcertified
- 38:05projects are commissioned during the
- 38:07design and construction phases as a
- 38:09requirement, the building systems create
- 38:12less problems during the building
- 38:13operations phase. Furthermore, people
- 38:16who work in leadcertified buildings have
- 38:19increased productivity due to the
- 38:21healthier environment of the buildings,
- 38:23which is the result of increased
- 38:25exposure to natural daylight, increased
- 38:27ventilation rates inside the building,
- 38:30less contaminated indoor air, more open
- 38:33spaces, increased acoustic performance,
- 38:36and many other aspects.
- 38:38Even though the initial cost of a
- 38:40leadcertified building may be slightly
- 38:42higher than a regular building, the life
- 38:44cycle cost of a regular building becomes
- 38:47much higher than a leadcertified
- 38:49building. With that being said, lead is
- 38:52not the only green building rating
- 38:54system in the world. It is also
- 38:56essential to discuss the other green
- 38:58building rating systems for the exam
- 39:00purposes. BRE, Casby, Green Globes and
- 39:04GB Tool are some of the other green
- 39:06building rating systems across the
- 39:08world.
- 39:10Building research establishments
- 39:12environmental assessment method in short
- 39:14BREE is a green building rating system
- 39:17developed in the United Kingdom used
- 39:19primarily in Europe.
- 39:22Comprehensive assessment system for
- 39:24building environmental efficiency in
- 39:26short CASBY is a green building
- 39:29management system in the Japanese
- 39:30market.
- 39:32Green building initiatives green globes
- 39:34US certification is a newer rating
- 39:37system which is adapted from Green
- 39:39Globes Canada. And last GB tool and SB
- 39:44tool are online international green
- 39:46building rating systems.
- 39:49There are also a growing number of state
- 39:51and local governments that are revising
- 39:53their building codes and standards in
- 39:55order to implement green principles. The
- 39:58International Green Construction Code,
- 40:00in short, IGCC, establishes baseline
- 40:04regulations about the green features of
- 40:06projects and also addresses a building's
- 40:09water efficiency, energy efficiency,
- 40:12site impacts, types and contents of
- 40:15materials used, and more. IGCC is
- 40:18developed by the International Code
- 40:20Council in short IC which is known to
- 40:24develop building codes mainly dedicated
- 40:26to building safety and fire prevention.
- 40:29In addition, local jurisdictions, local
- 40:33governments, and local building codes
- 40:35started to adopt IGCC codes, which
- 40:38enforce projects to implement green
- 40:41principles both in design and in
- 40:43construction.
- 40:45When adapted by jurisdictions, local
- 40:47governments or local building codes,
- 40:49IGCC becomes forcible unlike the other
- 40:53green building rating systems.
- 40:56In order to promote green developments,
- 40:59many municipalities award structural or
- 41:01financial incentives to developers or
- 41:04homeowners who practice green building
- 41:06techniques. The structural incentives
- 41:09provide rewards for green building
- 41:10projects by making available additional
- 41:13density bonuses or expedited permitting
- 41:16processes. Even though the review and
- 41:18permitting processes vary from one
- 41:20jurisdiction to another, they are
- 41:23generally lengthy processes. By reducing
- 41:25the review and permitting durations in
- 41:28exchange for developers establishment of
- 41:30green building standards, municipalities
- 41:33encourage developers to design green
- 41:35buildings. Density and height bonuses
- 41:38are another structural incentive. Many
- 41:41municipalities allow for percentage
- 41:43increases in Florida area ratio or other
- 41:46measures of density contingent upon
- 41:48certification or proof of green building
- 41:50practices. Now, let's take a look at the
- 41:53financial incentives. The financial
- 41:55incentives are direct incentives in the
- 41:58form of tax credits or grants to
- 42:00developers that build green buildings.
- 42:03Some municipalities offer reductions or
- 42:05waiverss for permit review or other
- 42:08ownerous permitting processes in
- 42:10exchange for developers use of green
- 42:12building standards. Revolving loan funds
- 42:15can also be available to those seeking
- 42:18to build or renovate to green building
- 42:20standards. If a developer is unfamiliar
- 42:23with green building practices, many
- 42:25municipalities provide free planning or
- 42:28certification training and assistance.
- 42:31Marketing assistance is also offered to
- 42:33promote green buildings, and many
- 42:35municipalities offer free marketing
- 42:37assistance via signage, awards,
- 42:40websites, and/or press releases.
- 42:45Lead professional credentials offer
- 42:47professionals a designation to help them
- 42:50stand out in the building industry.
- 42:52Currently, there are three main tiers of
- 42:54lead professional credentials which are
- 42:58lead green associate, lead accredited
- 43:01professional with specialty and lead
- 43:03fellow. Let's start with discussing the
- 43:06lead green associate credential. GBCI
- 43:10has created the lead green associate
- 43:12credential for professionals who want to
- 43:14demonstrate green building knowledge and
- 43:16expertise in non-technical fields of
- 43:18practice to denote basic knowledge of
- 43:21green design construction and
- 43:23operations.
- 43:25Lead green associates have a proven
- 43:27up-to-date understanding of green
- 43:29building principles and practices.
- 43:32One important thing to note is that the
- 43:35lead GA abbreviation is disapproved by
- 43:38the USGBC
- 43:40and cannot be used to demonstrate lead
- 43:42green associate professional credential.
- 43:46The second tier of the lead professional
- 43:48credentials is the lead accredited
- 43:50professional with specialty in short
- 43:53lead AP with specialty.
- 43:56Lead AP with specialty credential is
- 43:59created for professionals with advanced
- 44:02knowledge in green building practices
- 44:04and specialized in a particular lead
- 44:06rating system. The lead AP credential is
- 44:09divided into different specialties which
- 44:12is designed to show in-depth knowledge
- 44:14of a particular rating system which are
- 44:17lead AP building design plus
- 44:19construction, lead AP interior design
- 44:23plus construction, lead AP operations
- 44:26plus maintenance, lead AP neighborhood
- 44:29development and the lead AP homes. There
- 44:33is also a lead AP credential without any
- 44:36specialty called lead AP or legacy lead
- 44:39AP which was granted to professionals
- 44:42whom have passed the lead AP exam before
- 44:452009.
- 44:46Legacy lead AP credential is not offered
- 44:49anymore and all the new lead APS should
- 44:52choose a specialty. The third and last
- 44:54tier of the lead professional
- 44:56credentials is the lead fellow
- 44:58credential. According to USGBC,
- 45:02lead fellow designates the most
- 45:04exceptional professionals in the green
- 45:06building industry and it is the most
- 45:08prestigious designation awarded.
- 45:10Outstanding lead APS who have
- 45:12demonstrated exceptional achievement in
- 45:15key mastery elements related to
- 45:17technical knowledge and skill are
- 45:19eligible for the honor. Lead fellows
- 45:21have also made significant contributions
- 45:24in teaching, mentoring or research with
- 45:26proven outcomes and have a history of
- 45:29exemplary leadership, impactful
- 45:31commitment, service and advocacy in
- 45:35green building and sustainability.
- 45:37Other than the mentioned credentials,
- 45:39there are also lead professional
- 45:41certificates which are needed to become
- 45:43lead for home green raiders or just
- 45:46green raiders. Green Raiders provide
- 45:49infield verification to every lead for
- 45:52homes project. One thing to note is that
- 45:56the other rating systems do not require
- 45:58any infield verification.
- 46:01Lead APS or lead green associates may
- 46:04also choose to become lead reviewers to
- 46:07evaluate the educational lead courses on
- 46:09the education at USGBC
- 46:12which is the education portal of USGBC.
- 46:16In exchange, USGBC provides
- 46:19complimentary year-long subscription to
- 46:21the USGBC's education portal. For the
- 46:25exam purposes, it's essential to know
- 46:27that the credentiing exams and building
- 46:30certifications are administered by GBCI
- 46:34and not USGBC.
- 46:37While the lead reference guides, lead
- 46:39online, lead rating systems and the
- 46:42education programs are developed and
- 46:45managed by USGBC.
- 46:48Lead online is shared by both USGBC and
- 46:52GBCI.
- 46:54Lead credentials are for people while
- 46:56the lead rating systems are for
- 46:58buildings and neighborhoods.
- 47:01And last, professionals are accredited.
- 47:04buildings are certified.
- 47:08Lead green associates and lead APS with
- 47:11specialty should maintain their
- 47:12credentials by meeting the requirements
- 47:15of the credential maintenance program
- 47:17every 2 years or otherwise the
- 47:19credential will expire and retaking the
- 47:22exam will be necessary to maintain the
- 47:25lead professional credential. Under the
- 47:27credential maintenance program, all the
- 47:30lead green associates must earn 15
- 47:32continuing education hours while the
- 47:35lead APS with specialty will need to
- 47:37earn 30 continuing education hours every
- 47:402 years after earning their credential.
- 47:44Before diving into the lead rating
- 47:46systems, it is also important to mention
- 47:48lead online which is the online platform
- 47:51of USGBC.
- 47:54In lead online, project teams can
- 47:56register their project for lead
- 47:58certification, pay their certification
- 48:01fees, upload their lead submittals,
- 48:04submit documentation and photos, access
- 48:07their credit templates and calculators,
- 48:10contact their project reviewers, contact
- 48:13customer support, and more. for
- 48:16documenting the lead prerequisites and
- 48:18the credits. The project teams should
- 48:20fill the credit templates in lead
- 48:23online. With the use of credit
- 48:25templates, every lead project prepares
- 48:28lead submittals in the same format. This
- 48:31streamlines the preparation of lead
- 48:33applications as well as the review
- 48:35durations for the prerequisites and
- 48:38credits that require any calculation.
- 48:41Credit calculators are also built into
- 48:43the credit templates. To document the
- 48:45credit calculations, the project teams
- 48:48will input their calculation data into
- 48:50the credit template. At last, all the
- 48:54project team members can have access to
- 48:56the prerequisites and credits uploaded
- 48:58to the lead online. Please note that
- 49:01lead online is shared by both USGBC and
- 49:05GBCI since GBCI will be responsible for
- 49:09reviewing the submitted documents and
- 49:11granting the lead certification.
- 49:20[music]
- 49:25[music]
- 49:29Just like a car rental company
- 49:30categorizing its rental vehicles into
- 49:33categories as SUVs, minivans, compact
- 49:36cars, or standardsized cars, LEAD
- 49:39categorizes projects under lead rating
- 49:41systems according to their types of
- 49:43construction and space usage. For
- 49:47example, a newly built school project
- 49:49may fall under the lead building design
- 49:52plus construction schools rating system,
- 49:55but a hotel interior renovation project
- 49:58would fall under the lead interior
- 50:00design plus construction hospitality.
- 50:03The first thing a project team should do
- 50:05is to choose the lead's rating system
- 50:07that's appropriate for their project
- 50:09before registering the project for the
- 50:11lead certification. and then the project
- 50:14team can proceed with registering their
- 50:16project in lead online.
- 50:19No one can blame a sports car for not
- 50:21handling the road properly on a dusty
- 50:23mountain road. However, an SUV would be
- 50:27required to perform well in mountain
- 50:29roads. Just like we have different
- 50:31expectations for each vehicle category,
- 50:34lead has different expectations for each
- 50:37rating system in order to award the lead
- 50:40certification. To summarize, after a
- 50:43rating system is selected, project teams
- 50:45should basically need to work on
- 50:47fulfilling its requirements.
- 50:50Let's take a look at the first
- 50:51requirement which is applicable to all
- 50:53the lead rating systems. In other words,
- 50:56it's applicable to all the projects that
- 50:58want to pursue lead certification.
- 51:01It's called the minimum program
- 51:03requirements or MPRs. This will also be
- 51:07discussed in the following sections in
- 51:08more depth. But to summarize, a project
- 51:11must be in a permanent location on
- 51:14existing land, must use reasonable lead
- 51:17boundaries, and must comply with the
- 51:19lead project size requirements. Without
- 51:23fulfilling those three MPRs, a project
- 51:25cannot qualify for a lead certification.
- 51:28And this is applicable to all rating
- 51:30systems. Period. When going through the
- 51:33MPR section, please make sure you
- 51:35thoroughly know them for the exam
- 51:37purposes. After the project complies
- 51:40with the MPRs, now it's time to comply
- 51:43with the requirements of the selected
- 51:45rating system. There are two things a
- 51:47project should accomplish under each
- 51:49rating system. The first thing is to
- 51:51satisfy all the prerequisites of that
- 51:54rating system. You can think about them
- 51:56like MPRs inside each rating system. And
- 52:00without achieving all of the
- 52:02prerequisites, a project cannot achieve
- 52:04a lead certification.
- 52:06The second thing a project should do is
- 52:09to collect points by achieving credits
- 52:11of that rating system. Minimum 40 points
- 52:14out of 100 is required for a lead
- 52:17certification.
- 52:19All lead rating systems are scored out
- 52:21of 100 total points and 40 points is the
- 52:25minimum points to become lead certified
- 52:27which is the base level. Please note
- 52:29that prerequisites do not award any
- 52:32points only credits do. Every credit has
- 52:36a different requirement and every credit
- 52:38awards some points. Project teams decide
- 52:42on choosing the credits they want to
- 52:43pursue preferably during the beginning
- 52:46of the project. There are approximately
- 52:4970 credits under the lead building
- 52:51design plus construction rating systems
- 52:54and each has different point values.
- 52:56After achieving the chosen credits, this
- 52:59time the projects need to prepare some
- 53:01documentation to show that they have
- 53:03achieved their MPRs prerequisites and
- 53:06enough credits and basically upload it
- 53:09to lead online. Done. To summarize, in
- 53:13order to achieve a lead certification,
- 53:16there are the three MPRs with which
- 53:18every project must comply regardless of
- 53:21the rating system. Then there are
- 53:23prerequisites of each rating system that
- 53:26are mandatory to achieve for lead
- 53:27certification. Then the project team
- 53:30must choose credits to pursue and
- 53:33collect more than 40 points and all
- 53:35should be documented. What if a project
- 53:38satisfies all the MPRs prerequisites and
- 53:42gets a total of 80 points? Then it will
- 53:45be more than lead certified and will be
- 53:47given a lead platinum certificate.
- 53:50According to the total number of points
- 53:51a project receives, lead certification
- 53:54levels are determined. For the base
- 53:57certification level, which is called
- 53:59leadcertified, projects need to earn
- 54:01between 40 to 49 points. For lead silver
- 54:06certification, projects need to earn
- 54:08between 50 to 59 points. For lead gold
- 54:12certification, projects need to earn
- 54:15between 60 to 79 points. And for lead
- 54:19platinum certification, projects need to
- 54:22earn at least 80 points.
- 54:24Knowing the points required for each
- 54:26level of lead certification is essential
- 54:29for the exam.
- 54:31But if a project achieves all of the
- 54:33MPRs, earns 90 points, but misses only
- 54:37one prerequisite, no lead certification
- 54:40will be awarded. To see the complete
- 54:43list of prerequisites and credits and
- 54:45the credits point values, it's
- 54:47recommended to review the lead
- 54:49scorecard. Please review the scorecard
- 54:52carefully as some features of it can be
- 54:54asked on the exam.
- 54:56Lead scorecard or lead checklist is an
- 55:00important document which a project can
- 55:02choose the credits to be pursued and see
- 55:05if the total expected points will be
- 55:07enough to achieve the aimed level of
- 55:09lead certification
- 55:11for all the lead building design plus
- 55:14construction rating systems. The
- 55:16prerequisites and credits are
- 55:18categorized under nine categories which
- 55:21are also called the credit categories.
- 55:23We will discuss each credit category in
- 55:26depth in the following sections. But to
- 55:28summarize, the lead BD plus C credit
- 55:31categories are integrative process,
- 55:35location and transportation, sustainable
- 55:38sites, water efficiency, energy and
- 55:41atmosphere, which is also the credit
- 55:43category containing the highest points
- 55:46with 33 points. materials and resources,
- 55:50indoor environmental quality,
- 55:52innovation, and regional priority.
- 55:56But did you notice that there are 110
- 55:59total points available? Just like some
- 56:02exams have bonus questions, lead has 10
- 56:05bonus points. Innovation credit category
- 56:09awards six bonus points while the
- 56:12regional priority credit category awards
- 56:14four bonus points in lead. But still
- 56:17every project will be scored out of 100
- 56:21points not 110. And now let us take a
- 56:25closer look at the lead rating systems.
- 56:28Just like individuals have credentials
- 56:30like lead green associate or lead AP,
- 56:33all the lead projects are certified
- 56:35according to a lead rating system. All
- 56:38the lead rating systems are grouped
- 56:40under five broad categories depending on
- 56:43their construction types. One, lead for
- 56:46building design and construction or lead
- 56:49BD plus C. Two, lead for interior design
- 56:54and construction or lead ID plus C.
- 56:57Three, lead building operations and
- 57:00maintenance or lead O plus M. Four, lead
- 57:05for neighborhood development or lead ND.
- 57:08And five, lead for homes. And under
- 57:12these categories, rating systems are
- 57:15differentiated based on their space
- 57:17usage type in order to address specific
- 57:19needs of different project types. The
- 57:22rating systems under lead for building
- 57:24design and construction are new
- 57:27construction and major renovation, core
- 57:30and shell development, schools, retail,
- 57:34data centers, warehouses and
- 57:36distribution centers, hospitality and
- 57:39healthcare. The rating systems under
- 57:42lead for interior design and
- 57:44construction are commercial interiors,
- 57:48retail and hospitality.
- 57:51The rating systems under lead building
- 57:53operations and maintenance are existing
- 57:56buildings, retail, schools, hospitality,
- 58:01data centers, and warehouses and
- 58:04distribution centers. The rating systems
- 58:07under lead for neighborhood development
- 58:09are lead ND plan and lead ND built
- 58:14project.
- 58:16And at last, the rating systems under
- 58:19lead for homes are homes and multifamily
- 58:22low-rise and multifamily midrise.
- 58:26Projects can also choose to use the
- 58:28rating system selector inside lead
- 58:30online, which helps project teams to
- 58:33choose the most appropriate system for
- 58:35their project. Some projects may also
- 58:38seem appropriate for more than one
- 58:39rating system. Think about a 40story
- 58:42high-rise building project which
- 58:44contains a hotel in the first 20 floors
- 58:47and residential units on the floors
- 58:49above 20. Half of the building can be
- 58:52rated under lead BD plus C hospitality
- 58:56while the other half can be rated under
- 58:57lead BD plus C new construction and
- 59:00major renovation.
- 59:02But in lead projects cannot be divided
- 59:05into different rating systems as per
- 59:07sections and the whole project should be
- 59:10certified under one rating system. If
- 59:14more than one rating system seems
- 59:15applicable to a project, the 4060 rule
- 59:19will be used to decide on the rating
- 59:21system, which is the next topic.
- 59:24The 4060 rule is used to choose the
- 59:27appropriate rating system for the
- 59:29project if the project seems to fit
- 59:31under multiple rating systems. In the
- 59:344060 rule, a project should be divided
- 59:37into sections according to the
- 59:38appropriate rating system each section
- 59:40fits. Then the total floor area
- 59:43corresponding to each rating system
- 59:45should be calculated. If the total floor
- 59:48area of one of the applicable rating
- 59:50system is less than 40% of the project's
- 59:53total floor area, that rating system
- 59:56cannot be used. If the total floor area
- 59:59of one of the applicable rating system
- 1:00:01is more than 60% of the project's total
- 1:00:04floor area, that rating system must be
- 1:00:06used. If it falls between 40 and 60%
- 1:00:11then the project teams can decide on the
- 1:00:13rating system to be used for the
- 1:00:15project. Let's consider the 40story
- 1:00:18high-rise building project example in
- 1:00:20the previous topic which contains a
- 1:00:22hotel in the first 20 floors and
- 1:00:25residential units on the floors above
- 1:00:2720. Since 50% of the project's total
- 1:00:30area is appropriate for one rating
- 1:00:33system and the other 50% is appropriate
- 1:00:35for the other, the project teams will
- 1:00:38decide which rating system to use. This
- 1:00:41time the project teams can look at the
- 1:00:43requirements of lead BD plus C
- 1:00:45hospitality and lead BD plus C new
- 1:00:49construction and major renovation to
- 1:00:51decide on the rating system they will
- 1:00:53pursue. USGBC may ask the project teams
- 1:00:57to change their rating system if not
- 1:00:59chosen adequately.
- 1:01:02The minimum program requirements or in
- 1:01:05short MPRs are the minimum standards and
- 1:01:08characteristics that every lead project
- 1:01:10should meet to pursue lead
- 1:01:12certification.
- 1:01:14MPR state if a project can pursue lead
- 1:01:17certification or not. They provide
- 1:01:19guidance on the types of projects that
- 1:01:21are eligible for lead certification.
- 1:01:24protect the integrity of the lead
- 1:01:25program and reduce the number of issues
- 1:01:28that arise during the certification
- 1:01:30process. They define the types of
- 1:01:32buildings, spaces, and neighborhoods
- 1:01:35that a lead rating system is designed to
- 1:01:37evaluate.
- 1:01:38There are three MPRs.
- 1:01:41MPR number one, every project must be in
- 1:01:44a permanent location on existing land. A
- 1:01:48project that is designed to move at any
- 1:01:50point in its lifetime is not eligible
- 1:01:52for lead certification.
- 1:01:54Since the significant portion of lead's
- 1:01:56credits are dependent on the project's
- 1:01:58location, the certification is awarded
- 1:02:01according to that particular location.
- 1:02:04Prefabricated or modular structures can
- 1:02:06be leadcertified as long as they are
- 1:02:08installed permanently. It is important
- 1:02:11to locate the projects on existing land
- 1:02:13to avoid artificial land masses which
- 1:02:16can displace and disrupt ecosystems in
- 1:02:19the future. MPR number two projects must
- 1:02:24use reasonable lead boundaries. The lead
- 1:02:27project boundary must include all
- 1:02:29contiguous land that is associated with
- 1:02:31the project and support its typical
- 1:02:33operations.
- 1:02:35These will include the landscaping,
- 1:02:37septic or storm water treatment
- 1:02:39equipment, parking, sidewalks, and even
- 1:02:41more. Any project space cannot be shown
- 1:02:45excluded in order to give the project an
- 1:02:47advantage in complying with credit
- 1:02:49requirements. In addition, the gross
- 1:02:52floor area of the lead project should
- 1:02:54not be less than 2% of the gross land
- 1:02:57area within the lead project boundary.
- 1:02:59The lead project boundary is defined by
- 1:03:02the platted property line of the project
- 1:03:04including all land and water within it.
- 1:03:07And according to MPR number three,
- 1:03:10projects must comply with project size
- 1:03:12requirements. All lead projects must
- 1:03:15meet the following size requirements
- 1:03:17according to their rating system. For
- 1:03:20lead BD plus C and lead O plusm rating
- 1:03:23systems, projects must include minimum
- 1:03:261,000 square ft or 93 square me gross
- 1:03:30floor area. For lead ID plus C rating
- 1:03:33systems, projects must include minimum
- 1:03:36250 ft or 22 square me gross floor area.
- 1:03:41For lead for neighborhood development
- 1:03:43rating systems, projects should contain
- 1:03:45at least two habitable buildings and be
- 1:03:48no larger than500 acres. And for lead
- 1:03:52for homes, projects must be defined as a
- 1:03:54dwelling unit by all applicable codes. A
- 1:03:58dwelling unit should include permanent
- 1:04:00provisions for living, sleeping, eating,
- 1:04:02cooking, and sanitation. The lead for
- 1:04:05homes project should also refer to the
- 1:04:07lead for homes scope and eligibility
- 1:04:10guidelines as well.
- 1:04:14Whether deciding to pursue lead
- 1:04:15certification or not, all projects
- 1:04:18should first take a look at the MPRs to
- 1:04:20see if their project can be eligible for
- 1:04:22a lead certification. Then the project
- 1:04:25teams will need to determine the rating
- 1:04:27system that their project fits into.
- 1:04:30After the rating system is selected,
- 1:04:32project team should evaluate the
- 1:04:34prerequisites and credits of that rating
- 1:04:36system. Prerequisites are the minimum
- 1:04:39requirements that all buildings under a
- 1:04:41certain rating system must meet in order
- 1:04:44to achieve lead certification.
- 1:04:46For example, all the projects that are
- 1:04:48certified under the lead BD plus C
- 1:04:51healthcare rating system must meet all
- 1:04:53the prerequisites of that rating system.
- 1:04:56While a project registered under LEA
- 1:04:58lead O plusM retail must meet all of its
- 1:05:01prerequisites.
- 1:05:03To illustrate, let's take a look at one
- 1:05:05of the prerequisites under the lead BD
- 1:05:08plus C new construction and major
- 1:05:10renovation rating system, which is in
- 1:05:12this case the fundamental refrigerant
- 1:05:15management prerequisite. Briefly, this
- 1:05:18prerequisite requires that the projects
- 1:05:20do not use CFCbased refrigerants in
- 1:05:23their HVACR systems.
- 1:05:26Therefore, every project under this
- 1:05:28rating system will not use any CFCbased
- 1:05:31refrigerants. Period. Any project that
- 1:05:34cannot meet this requirement will not be
- 1:05:37eligible for a lead certification.
- 1:05:39While projects can pick and choose the
- 1:05:41credits they want to pursue,
- 1:05:43prerequisites are mandatory. Fulfilling
- 1:05:46the requirements of prerequisites will
- 1:05:48also not award any points.
- 1:05:51Now let's take a look at the credits
- 1:05:54which are also a part of each rating
- 1:05:55system. Projects are free to go for any
- 1:05:58credit they want within the selected
- 1:06:00rating system. Each credit has
- 1:06:03requirements to be fulfilled and once
- 1:06:05the requirements are met, the project
- 1:06:07will earn points. The higher the total
- 1:06:10points a project earns means a higher
- 1:06:13level of lead certification will be
- 1:06:15awarded. To illustrate a credit, let's
- 1:06:18take a look at one of the credits under
- 1:06:20the lead BD plus C new construction and
- 1:06:23major renovation rating system, which is
- 1:06:25in this case the access to quality
- 1:06:28transit credit. Briefly, this credit
- 1:06:31requires the project to be located
- 1:06:33within walking distance to public
- 1:06:35transportation to reduce greenhouse gas
- 1:06:38emissions resulting from single
- 1:06:40occupancy vehicle use. Hence, any lead
- 1:06:43BD plus C new construction and major
- 1:06:46renovation project located at a walking
- 1:06:48distance to public transportation will
- 1:06:51earn points under this credit. Projects
- 1:06:53that do not comply with this credit will
- 1:06:55not receive any points. As mentioned,
- 1:06:58there are 100 total points allocated to
- 1:07:01the credits under each rating system.
- 1:07:03Plus, there are 10 bonus points. A
- 1:07:07project that earns 50 points in total
- 1:07:09will receive a lead silver while another
- 1:07:12project that earns 80 points will
- 1:07:14receive lead platinum if both of them
- 1:07:17additionally satisfied all the
- 1:07:19prerequisites and the MPRs. The
- 1:07:22prerequisites and credits are also
- 1:07:24categorized as design or construction
- 1:07:27prerequisites or credits according to
- 1:07:30the project phase they are performed in.
- 1:07:32For example, the mentioned access to
- 1:07:35quality transit credit is a design
- 1:07:37credit since the project's location will
- 1:07:40not be decided during the construction
- 1:07:42phase.
- 1:07:43Other than the prerequisites and
- 1:07:45credits, there are also pilot credits
- 1:07:48which are credits being tested for the
- 1:07:50updated version of lead. And according
- 1:07:52to the feedback received by USGBC, these
- 1:07:56pilot credits can become actual credits
- 1:07:58of the updated lead rating system, which
- 1:08:01would be lead V5. Pursuing any pilot
- 1:08:04credit is optional to team members. But
- 1:08:07if the project chooses to earn a pilot
- 1:08:09credit, bonus points will be awarded.
- 1:08:12The points will be awarded under the
- 1:08:14innovation credit which is located under
- 1:08:17the innovation credit category that we
- 1:08:19will discuss in the later sections.
- 1:08:22Project teams can find the pilot credits
- 1:08:24that are available to each rating system
- 1:08:27from the lead pilot credit library on
- 1:08:29the USGBC's website.
About this transcript
This page contains the full transcript of LEED Green Associate Exam Prep Course by Projectific, generated from the public captions YouTube serves with the video. The transcript has 9,254 words across 1,608 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.