  1. 0:01[Music]
  2. 0:22[Music]
  3. 0:26so hello dear friends welcome back to
  4. 0:28nptl online course on Logistics and
  5. 0:30Supply Chain management so in the last
  6. 0:32session we discussed about uh balance
  7. 0:35scorecard and uh in this session we'll
  8. 0:37continue the discussion how we can
  9. 0:39implement the balance scorecard approach
  10. 0:42in supply chain uh measuring the
  11. 0:44performance and how we can improve the
  12. 0:46performance in different uh all those
  13. 0:48four perspectives right so uh already we
  14. 0:51discussed about the basics of the uh
  15. 0:53balance scorecard uh what are those
  16. 0:55different four perspective related to
  17. 0:57customer related to stakeholder related
  18. 1:00to how we are learning how we are
  19. 1:01growing our internal processes how we
  20. 1:04can Implement how we can improve those
  21. 1:06processes so that we can tap all those
  22. 1:09performance indicators and we can
  23. 1:11improve that so uh we'll continue this
  24. 1:14discussion and uh uh we'll find out the
  25. 1:17balanced scorec card for uh supply chain
  26. 1:20we'll discuss about the quality delivery
  27. 1:22cost performance indices and then we'll
  28. 1:25see how we can measure the supply chain
  29. 1:27performance right different techniques
  30. 1:29and we'll end discussion with uh one
  31. 1:31case study right so already now we know
  32. 1:35for perspective so what are our
  33. 1:38financial results Financial result in
  34. 1:40terms of profit in terms of market share
  35. 1:43in terms of return on investment how
  36. 1:45much we are investing in all the areas
  37. 1:48in your warehousing keeping extra
  38. 1:49inventory whether we are getting those
  39. 1:51returns we are renovating innovating the
  40. 1:54products with our r& team whether that
  41. 1:56investment is getting uh we are getting
  42. 1:59the you know fruitful results or not so
  43. 2:02we'll measure in terms of financial uh
  44. 2:05performance right and internal business
  45. 2:08processes so machine productivity
  46. 2:10customer responses time machine
  47. 2:12productivity means how we can improve
  48. 2:14that maybe we'll come with the new
  49. 2:17technology or not if new technology how
  50. 2:20efficiently we can use the old
  51. 2:21technology and we can improve the
  52. 2:23overall performance improve and
  53. 2:26innovate uh how we can uh you know
  54. 2:30internally we can improve right our uh
  55. 2:33resources we can uh in that way we can
  56. 2:37Empower our in sources in that way so
  57. 2:39that we can you know utilize those
  58. 2:41skills to uh uh satisfy our customer
  59. 2:46with the quality with the delivery
  60. 2:48parameters and also we are cost
  61. 2:50efficient so clients so client
  62. 2:53satisfaction all the clients
  63. 2:55stakeholders uh involved in that value
  64. 2:58chain how we can make them uh satisfied
  65. 3:01so we'll quickly go for this balance
  66. 3:03scorecard approach and uh we'll see what
  67. 3:06can be the financial uh measures when we
  68. 3:09are talking about supply chain
  69. 3:10specifically so first is how we can
  70. 3:14decrease the cost right so there are so
  71. 3:17many different ways if you are you know
  72. 3:20negotiating on quantity with the
  73. 3:21supplier then also you can decrease the
  74. 3:23cost if you are automating your
  75. 3:25Warehouse you can decrease the handling
  76. 3:27and storage cost if you can Implement uh
  77. 3:31Point of Sales system where you are
  78. 3:33directly linked with the sales team you
  79. 3:35can imp you can minimize the inventory
  80. 3:37right so spending and cost of goods sold
  81. 3:41how you can anal analyze your spending
  82. 3:44you can do the spending analysis so how
  83. 3:47much your transportation is contributing
  84. 3:49in that how much your Logistics is
  85. 3:51contributing in that how much your
  86. 3:53manufacturing is contributing your raw
  87. 3:55material suppliers is contributing so
  88. 3:57that you can find out and then you can
  89. 3:59comp that okay your Logistics is
  90. 4:02contributing 14% but the industry
  91. 4:04average is 10% how we can improve by
  92. 4:07this 4% Gap right resource optimization
  93. 4:11again routing vehicle routing or
  94. 4:14Warehouse optimization manufacturing
  95. 4:16facility optimization payment terms
  96. 4:19financially uh how we can negotiate with
  97. 4:22our vendors that we'll make payment in
  98. 4:2330 days or 60 days or 90 days longer
  99. 4:26period you will get that means your
  100. 4:27negotiation power is high
  101. 4:30leveraged agreements if you have said
  102. 4:32that 90 days payment you can leverage on
  103. 4:35that period right you can extend the
  104. 4:37payment so for that period you maybe
  105. 4:39that cost that Financial uh cash you can
  106. 4:43use somewhere else supplier
  107. 4:46consolidation this also when you are you
  108. 4:48know uh maybe for one supplier you are
  109. 4:50ordering different components uh dealing
  110. 4:53with the same kind of your own metal if
  111. 4:55you are doing dealing with same supplier
  112. 4:57can supply the multiple products also
  113. 5:00and not so if only one component so then
  114. 5:02you can consolidate the order in large
  115. 5:04quantity so that on quantity you can
  116. 5:07negotiate you can find out the cheaper
  117. 5:09location and then competitive bidding
  118. 5:12then open competitive bidding can be
  119. 5:14done so whosoever is cost efficient
  120. 5:16quality efficient you can uh use that so
  121. 5:19this is financially how you can improve
  122. 5:22business processes sourcing methodology
  123. 5:24already we discussed about that vendor
  124. 5:27rating will help you to pick the best
  125. 5:29supply chain your stakeholder and then
  126. 5:31sourcing how much purchasing if you are
  127. 5:34talking about strategic
  128. 5:36sourcing longterm vendors you have
  129. 5:38developed so how you'll do the
  130. 5:40purchasing decision how frequently you
  131. 5:42will buy what will be the lot size right
  132. 5:44what is the lead time whether you are
  133. 5:46implementing just in time to cut down
  134. 5:48the inventory cost so then your
  135. 5:50strategic sourcing is required risk
  136. 5:53protection what if you are dealing with
  137. 5:55some kind of Uncertain market and then
  138. 5:59uh
  139. 6:00suddenly you need to phase out your
  140. 6:01product so what you will do with the uh
  141. 6:04inventory raw material inventory
  142. 6:06supplier allenes contract management
  143. 6:08Performance Management these are some of
  144. 6:10the internal business processes how you
  145. 6:12can handle with your stakeholder means
  146. 6:14all the processes you are doing or
  147. 6:17dealing with your stakeholders you need
  148. 6:19to uh improve that right decision making
  149. 6:22skills how Predictive Analytics big data
  150. 6:25analytics and those tools software you
  151. 6:27can use to predict uh your demand to
  152. 6:30predict Supply to predict the
  153. 6:32fluctuation not only in the internal
  154. 6:34environment in the uh in the external
  155. 6:37environment in the internal environment
  156. 6:38also you can use this like total
  157. 6:40predictive maintenance when a particular
  158. 6:42machine requires the maintenance before
  159. 6:44breakdown happens how we we can maintain
  160. 6:47that so that there should not be any
  161. 6:49breakdown no rejection should be
  162. 6:51produced right learning and growth team
  163. 6:54building we can do learning and growth
  164. 6:56means within all all the resources how
  165. 6:59we can
  166. 7:00uh develop those resources develop the
  167. 7:02skills so that maybe some sometime it
  168. 7:05happens during recession one of very
  169. 7:08beautiful example what infosis did like
  170. 7:11uh uh when all the industry during that
  171. 7:152008 recession when major it stakeholder
  172. 7:18they started firing their employees but
  173. 7:20what infosis did they retained all the
  174. 7:23emplo and deled their capabilities they
  175. 7:26they took it as the time for pulling up
  176. 7:29your soxes and whenever you you know
  177. 7:31again there will be market demand you
  178. 7:34can you know run in the more faster way
  179. 7:36right so that that will you know will
  180. 7:40help you to satisfy your employees your
  181. 7:42turnover rate you can man manage
  182. 7:45attrition rate you can manage right so
  183. 7:47the example I quoted that you you need
  184. 7:49to maintain if you need to maintain your
  185. 7:51employees for longer time you need to
  186. 7:54show them the proper career path
  187. 7:56development path their development
  188. 7:58should not saturate right then customers
  189. 8:01how we can satisfy customer with
  190. 8:03different features variety customer
  191. 8:06services how we can improve the quality
  192. 8:09prices whatever price they are asking in
  193. 8:11that price range whatever quality you
  194. 8:13can offer right so and after S Services
  195. 8:16your branding whether your customer is
  196. 8:19feeling comfortable you know when your
  197. 8:22customer is bearing that brand using
  198. 8:24that brand sometimes you are you know
  199. 8:26wearing very you know expensive watch
  200. 8:28then always you are showing that or you
  201. 8:30want you are carrying that you know that
  202. 8:32image that you are wearing Rolex or you
  203. 8:35are using that kind of stuff right High
  204. 8:38status product so that is attached with
  205. 8:40the customer performance so we'll go
  206. 8:42through financial
  207. 8:44perspective in supply chain all the kpis
  208. 8:48will which will help us to you know
  209. 8:49configure your uh Financial function so
  210. 8:53cost reduction talking about I have
  211. 8:55already discussed in the previous
  212. 8:57session where we are you know uh
  213. 8:59involved with the cost function your
  214. 9:02material acquisition handling storage
  215. 9:05Transportation manufacturing
  216. 9:07distribution all these functions are
  217. 9:10adding cost so how we can reduce the
  218. 9:13cost return on investment like if we are
  219. 9:16investing on something let's say uh we
  220. 9:19are investing on developing
  221. 9:21technological
  222. 9:22infrastructure right so that
  223. 9:24technological infrastructure it helping
  224. 9:26you to fetch more customers right if you
  225. 9:29are saying that Amazon today will
  226. 9:32announce that all the deliveries will be
  227. 9:34done in the same day that means
  228. 9:37technological implementation will be
  229. 9:39there and you need to fasten up your
  230. 9:41distribution network if you are doing
  231. 9:43that huge investment will be there even
  232. 9:45for sometimes if one person is carrying
  233. 9:49maybe more than 200 orders even
  234. 9:52sometimes 100 orders also they need to
  235. 9:54deliver right so that investment if you
  236. 9:56are doing whether you are fetching more
  237. 9:58customers more traffic is coming to your
  238. 10:00website then Revenue growth is happening
  239. 10:03if sales are increasing then it is fair
  240. 10:06enough you can go for the Improvement
  241. 10:08right second is client or customer
  242. 10:11perspective order fulfillment rate how
  243. 10:14quickly you are fulfilling the order
  244. 10:15customer satisfaction score feedback
  245. 10:18whether customers are giving you uh the
  246. 10:20high feedback or not or if you are
  247. 10:23getting lower feedback you need to
  248. 10:24prioritize those area where you are
  249. 10:26getting lower feedback very small
  250. 10:28example Let's uh imagine you order AC
  251. 10:33through uh flip cart Now flip cart gave
  252. 10:36you the best pricing option you are very
  253. 10:38happy you are getting the cash back also
  254. 10:41then they are giving you free
  255. 10:42installation services right this is what
  256. 10:45Flipkart could do maximum they did this
  257. 10:49now now they have to deliver this
  258. 10:51product within that time using the local
  259. 10:54retail
  260. 10:55partner that is also maybe they can
  261. 10:57ensure that within that delivery is done
  262. 11:00but who will do the installation the
  263. 11:02local technician who is coming from that
  264. 11:05if you are buying from Hitachi that
  265. 11:06technician will come if you are buying
  266. 11:08from bpool bpool technician will come so
  267. 11:11then your feedback is not only your
  268. 11:14feedback it is associated if delivery
  269. 11:17person or that installation technician
  270. 11:19is coming late not behaving properly
  271. 11:22with the customer you as the service
  272. 11:25provider will be rated maybe you did
  273. 11:27everything right but there you lacked
  274. 11:30and then you got lower feedback so then
  275. 11:32you need to it's not that you you will
  276. 11:35just say that that is not my you know uh
  277. 11:38area or jurisdiction area where I can
  278. 11:40control those things but then I will
  279. 11:42think about that player who can control
  280. 11:45the installation services also right so
  281. 11:48lead time how much time you are require
  282. 11:51uh you know taking to fulfill the order
  283. 11:54internal business process perspective uh
  284. 11:57talking about the Improvement of supply
  285. 11:59chain you can include kpis like cycle
  286. 12:02time how quickly you are completing the
  287. 12:04order how quickly if you are
  288. 12:06manufacturing how quickly you are
  289. 12:08changing over from one model to other
  290. 12:10model inventory turnover how much
  291. 12:12inventory you are keeping and how much
  292. 12:15how quickly you are selling that
  293. 12:17inventory in the market
  294. 12:19right supply chain flexibility how
  295. 12:22quickly your supply chain can adapt to
  296. 12:25the changes if any demand for new
  297. 12:27product variety or any Supply disruption
  298. 12:30is there any disaster happens any strike
  299. 12:33is there still your supply chain is
  300. 12:35resilient enough to you know obsorb all
  301. 12:38those uh disruptions within the supply
  302. 12:41chain and then you can still maintain
  303. 12:43the smooth Supply Innovation and
  304. 12:46Improvement so how you can ensure your
  305. 12:49kpis targeting continuous innovation
  306. 12:52Philips and you continuous innovation
  307. 12:55right Innovation and you that is the
  308. 12:57tagline for flips right so imply
  309. 13:00training and devopment Technology
  310. 13:01utilization Innovation rate how quickly
  311. 13:04you are innovating new products coming
  312. 13:06up with new products how quickly or what
  313. 13:10is the you know uh technology
  314. 13:12penetration rate how quickly you are
  315. 13:14implementing new technology if there is
  316. 13:17WMS warehouse management system whether
  317. 13:20you have implemented or not if we are
  318. 13:22talking about in Industry 4.0 supported
  319. 13:24system whether you are doing that or not
  320. 13:27right so how quickly you can
  321. 13:29improve and innovate so let's talk about
  322. 13:32this supply chain perspective uh uh this
  323. 13:36balance score card framework
  324. 13:38specifically with the procurement
  325. 13:40talking about procurement Financial
  326. 13:42measures will be how we can save
  327. 13:44cost that means we need to negotiate
  328. 13:47with the vendors how you can negotiate
  329. 13:50with the vendors when you are having
  330. 13:51more purchasing power then you are
  331. 13:53buying in bulk right so that means that
  332. 13:56purchasing power you can use to
  333. 13:58negotiate with the bend uh vendors to
  334. 14:01total cost of ownership you are
  335. 14:03calculating it's not only the raw
  336. 14:05material cost so how he is delivering
  337. 14:08storing in between that cost is also
  338. 14:11there what is the cost per unit or per
  339. 14:14transaction you can calculate and what
  340. 14:16was the procurement budget and whether
  341. 14:18you are hitting that budget as per the
  342. 14:20planned budget or you exceeded or you uh
  343. 14:25managed within under that budget right
  344. 14:27so that means you are performing better
  345. 14:30depending upon customer how many
  346. 14:32complaints are coming right customer
  347. 14:34which is which are directly related to
  348. 14:36your vendors right so let's say one
  349. 14:38component is not working properly so
  350. 14:41that means you bought TV or uh then you
  351. 14:45suddenly realize that your sound system
  352. 14:47is not working properly right so that
  353. 14:50that means from where you are ensuring
  354. 14:52that system so that resp that is the
  355. 14:54respons you need to do the byby analysis
  356. 14:56why that happened so then you will find
  357. 14:58out the quickly that this this is
  358. 15:01happening because of the problem in the
  359. 15:03component of sound system right internal
  360. 15:06customer set inspection we can use cross
  361. 15:09functional teams for selecting and
  362. 15:10evaluating suppliers we have already
  363. 15:13discussed in detail how we can select
  364. 15:15the vendors based on that any customer
  365. 15:17complaint is coming directly related to
  366. 15:20the vendor of that particular component
  367. 15:23so that is the responsibility of that
  368. 15:25vendor and we need to improve that with
  369. 15:27with collaboration with the vendor
  370. 15:29internal business processes like
  371. 15:33procurement procurement is how you are
  372. 15:35raising the purchase orders when you are
  373. 15:37sensing that there is you know the
  374. 15:40inventory has depleted up to that level
  375. 15:42you need to again replenish the
  376. 15:44inventory how quickly you can do that
  377. 15:47Canan production system you can
  378. 15:48Implement right so when you are raising
  379. 15:50the purchase order you need to keep in
  380. 15:52mind the quantity you are purchasing so
  381. 15:55that you can negotiate the price then
  382. 15:57you need to keep in mind the inventory
  383. 15:58also so you are one way you are
  384. 16:01negotiating the price of acquiring that
  385. 16:03material other way you are increasing
  386. 16:05the inventory cost right so average
  387. 16:08value of purchase order you can
  388. 16:10calculate learning and growth so how
  389. 16:13your stakeholders are learning and uh
  390. 16:17implementing certifications if you are
  391. 16:19talking about ISO certification quality
  392. 16:21certification whether they are ISO
  393. 16:23certified or not so it is important if
  394. 16:26you are claiming ISO certified your
  395. 16:28vendor should be first ISO certified
  396. 16:30because you are getting raw material
  397. 16:32from them right so then employee
  398. 16:35satisfaction and turnover these are the
  399. 16:37points we discussed in the balance score
  400. 16:39card how we can Implement balance
  401. 16:42scorecard in supply chain these are some
  402. 16:44of the steps Define your strategic
  403. 16:46objective first is you need to define
  404. 16:49the supply chain vision and your
  405. 16:52objective right if you're saying you are
  406. 16:54cost efficient then you need to stick to
  407. 16:57that if you're saying you are responsive
  408. 16:59you need to stick to that if you're
  409. 17:01saying that you are uh providing a
  410. 17:03variety of the products you need to
  411. 17:05stick that so if you are saying that we
  412. 17:08are covering the maximum pin locations
  413. 17:11you need to stick with the distribution
  414. 17:13strategies right develop specific Matrix
  415. 17:17once you have defined the strategy you
  416. 17:19need to develop the specific Matrix if
  417. 17:21if I'm saying I'm serving to all the PIN
  418. 17:25codes in in India that means I need to
  419. 17:29ensure I need to develop some specific
  420. 17:31matrics related to distribution Network
  421. 17:33how much lead time for particular pin
  422. 17:35code in rural area in urban area in s
  423. 17:38urban area in Metro city right so
  424. 17:41whenever you will say one day delivery
  425. 17:43you will keep in mind what are those
  426. 17:45location where I can ensure one day
  427. 17:46delivery that is one matric right so
  428. 17:49that means when you are coming up with
  429. 17:51the new strategies so you need to figure
  430. 17:54out whether that same strategy one day
  431. 17:56you can Implement in a rural area no
  432. 17:59because the demand you cannot
  433. 18:01consolidate in that way very fragmented
  434. 18:03demand is coming right so that you
  435. 18:05cannot ensure once you have DW The
  436. 18:07Matrix you need to collect the data so
  437. 18:10now you know lead time you are recording
  438. 18:12inventory cost you are recording
  439. 18:14Transportation cost per unit per
  440. 18:16kilometer you are recording or
  441. 18:18manufacturing cost per unit you are
  442. 18:19recording you need to record data today
  443. 18:23whatever you have produced you need to
  444. 18:25record the what is the cost total cost
  445. 18:28review and adjust then you need to make
  446. 18:31the informed decisions that these are
  447. 18:33some of the area where you need to
  448. 18:35Target so those areas which are
  449. 18:37contributing maximum to the you know
  450. 18:40cost you need to maybe these are some of
  451. 18:42the area which are contributing to the
  452. 18:44cost so leave those area first we need
  453. 18:46to tap these two areas maybe which are
  454. 18:49contributing around 60 to 70% again 8020
  455. 18:52rule you can Implement parto analysis
  456. 18:55you can do and then Foster collaboration
  457. 18:58anything you are implementing that will
  458. 19:00be implemented through your stakeholders
  459. 19:02so collaboration need to be ensured so
  460. 19:05quickly benefits of stake uh using
  461. 19:07balance
  462. 19:08scorecard holistic approach we are
  463. 19:11including all the functional units all
  464. 19:13the stakeholders strategic alignment
  465. 19:15whatever your strategy is you are
  466. 19:17aligning all functional units with your
  467. 19:20strategy embedded enhanced decision
  468. 19:22making because more informed decisions
  469. 19:25based on facts and figures and
  470. 19:27continuous Improvement because internal
  471. 19:30growing and learning and sustainability
  472. 19:34that parameters we are tapping here so
  473. 19:37under supply chain we'll discuss about
  474. 19:40the quality delivery and cost these are
  475. 19:43the main performance Index right which
  476. 19:45you need to tap so always we need to
  477. 19:48make the trade off what are the
  478. 19:50constraints right and what are the
  479. 19:53variables how we can deal with those
  480. 19:55it's not that any day you can make any
  481. 19:58promise
  482. 19:59every industry every player is working
  483. 20:01on some limitation some constraint some
  484. 20:04are limited by quality some are limited
  485. 20:06by capacity some are limited by variety
  486. 20:09some are limited by their R&D skills
  487. 20:11some are and they have their own USBS as
  488. 20:14well their strength area as well right
  489. 20:17so you need to Define where you are
  490. 20:19standing so quality performance indices
  491. 20:22will see and delivery and cost
  492. 20:25performance so quality performance
  493. 20:27percentage of rejection that means
  494. 20:30number of defects received and total
  495. 20:33number of items received so how much
  496. 20:36percentage 10%
  497. 20:38rejection that means this much rejection
  498. 20:41daily you are dealing with either you
  499. 20:43are talking about let's talk about the
  500. 20:45raw material you are getting so whatever
  501. 20:47you are using 10% is rejected without
  502. 20:50using that means those many defects are
  503. 20:53coming once you have produced that you
  504. 20:55shipped that in the market from Market
  505. 20:575% products are coming back because
  506. 21:00during shipment
  507. 21:02damaged right defects per million
  508. 21:05opportunities using we are do uh usually
  509. 21:07we are using this measure to implement
  510. 21:10Six Sigma where we are saying 3.4
  511. 21:12defects are allowed per million
  512. 21:15opportunity right so how we are
  513. 21:17calculating that number of defects found
  514. 21:20total number of item tested right so
  515. 21:23that is defects per million
  516. 21:25opportunity supplier rejection
  517. 21:27percentage number of rejection total
  518. 21:30number of suppliers that you need to
  519. 21:32find out what is the supplier rejection
  520. 21:34rate if your supplier rejection rate is
  521. 21:363% that means 3% of your suppliers
  522. 21:39whatever they are supplying usually you
  523. 21:41are you are rejecting those item not up
  524. 21:43to the mark As per quality but this is
  525. 21:46you need again you can compare with the
  526. 21:48best performance in Industry percentage
  527. 21:51nonn compliance number of non-compliance
  528. 21:54total number of observation right so if
  529. 21:57you say let's say you are dealing with
  530. 21:59the raw material
  531. 22:02quality so many Zero Hour rejection is
  532. 22:05coming that means whenever you start
  533. 22:07using the product you just inspected
  534. 22:10that and you uh just observe that there
  535. 22:15is something wrong with the product that
  536. 22:17means then you how you can improve that
  537. 22:20you started some compliance measure that
  538. 22:22they need your vendors need to send the
  539. 22:25QC reports whenever they are sending the
  540. 22:28lot that means they need to inspect the
  541. 22:30quality only then they can ship the
  542. 22:33lot now this is one measure you have
  543. 22:36picked but the how many vendors are
  544. 22:38complying to this QC report maybe all
  545. 22:42the vendors they started implementing
  546. 22:44but you received 10 Lots out of that
  547. 22:47only eight Lots you are getting the
  548. 22:50reports as two lots you did not receive
  549. 22:53the QC report of their outgoing quality
  550. 22:56control so that means that known company
  551. 22:58liance percentage non- compliance
  552. 23:00rectified so how many you are rectifying
  553. 23:03means you raise this complaint that this
  554. 23:06times out of 10 two lots we did not
  555. 23:09receive your outgoing quality report
  556. 23:12right so how quickly they are rectifying
  557. 23:15that that also you can measure next is
  558. 23:17delivery performance IND supplier on
  559. 23:20time delivery and in full delivery if
  560. 23:22I'm placing grocery items order I placed
  561. 23:26order for 50 items so 40 items you uh
  562. 23:31delivered in time and then rest of the
  563. 23:3410 items were not available that means
  564. 23:36that are not in full so this is you can
  565. 23:38calculate how many items are in full how
  566. 23:41many are placed you can find out the
  567. 23:43percentage delivery in full on time
  568. 23:45percentage delivery in full percentage
  569. 23:48delivery in time minus percentage
  570. 23:51rejected so you you delivered on time
  571. 23:55full quantity but then because of some
  572. 23:58defects out of 50 items five were
  573. 24:00returned back supplier lead time
  574. 24:03variability whatever you are saying
  575. 24:05three times is the delivery time plusus
  576. 24:07one day that means that is lead time you
  577. 24:10are looking for overall lead time actual
  578. 24:13delivery time required lead time this is
  579. 24:15overall lead time right percentage of
  580. 24:18shipment arriving in good condition how
  581. 24:20many shipments are arriving in good
  582. 24:22condition how many defective shipments
  583. 24:24are there that you can find out the
  584. 24:26average average delivery time so so sum
  585. 24:29of total number of period from dispatch
  586. 24:31to receive total number of shipment so
  587. 24:33these are the delivery related
  588. 24:35performance index you can calculate for
  589. 24:38the individual uh whatever you are
  590. 24:40recording cost performance
  591. 24:43index now you can record the cost
  592. 24:45performance also cost performance index
  593. 24:48whatever earned value whatever actual
  594. 24:50value actual value you said maybe 100
  595. 24:53and then the earned value is 100 that
  596. 24:55means one perfectly whatever your budget
  597. 24:58was exactly your project is going as per
  598. 25:00that right if it is greater than one
  599. 25:04your budget is your project is under
  600. 25:06budget that means cost efficiency is
  601. 25:10there 100 you can spend but you
  602. 25:14completed within 90 bucks only that
  603. 25:16means you are efficient but if you are
  604. 25:18spending extra this Factor will be more
  605. 25:20than one right so you can just quickly
  606. 25:22go through earned value is planned value
  607. 25:25into percentage complete and planned
  608. 25:27value is the authorized I budget
  609. 25:29assigned right that is planned value and
  610. 25:31percentage complete what percentage you
  611. 25:33have completed right and the actual cost
  612. 25:36is the total cost incurred for the
  613. 25:39actual work performed right so this is
  614. 25:41how you can find out the earned value
  615. 25:43divided by the actual
  616. 25:46value cost performance index so cost
  617. 25:50avoidance actual purchase price what was
  618. 25:52the actual purchase price and lowest
  619. 25:55coted purchase price so you invited the
  620. 25:57tenders what was the lowest price and
  621. 26:00then maybe you finalized you did not
  622. 26:03finalize the lowest one depending upon
  623. 26:05the quality delivery schedules you may
  624. 26:07pick the next lowest so then that will
  625. 26:09be the cost reduction what was the
  626. 26:11actual price you not you did not maybe
  627. 26:14the actual pricing maybe 100 rupees this
  628. 26:17lowest qu quoted price was 80 but you
  629. 26:20picked the vendor with 90 so this will
  630. 26:22be 100us 90 because 80 fuel pick maybe
  631. 26:27he was delivering little late so then
  632. 26:29you pick the other person right
  633. 26:31procurement Roi cost reduction Plus cost
  634. 26:35avoidance divided by cost of procurement
  635. 26:38operations right procurement cost as per
  636. 26:40percentage of sale so how much you are
  637. 26:43total selling what what is your
  638. 26:46procurement department is adding into
  639. 26:48that so if your procurement is adding
  640. 26:51maybe 30% cost so then you can see your
  641. 26:55procurement if you're including
  642. 26:56procurement of your raw material
  643. 26:57supplier ERS so right acquisition cost
  644. 27:00total cost of ownership so you can
  645. 27:02compare the other Industries somewhere
  646. 27:04maintaining 28% so you are 2% you know
  647. 27:09uh not cost efficient your competitors
  648. 27:11are 2% cost efficient than you so you
  649. 27:14need to you know negotiate better than
  650. 27:16with your players your
  651. 27:19partners how we can measure the supply
  652. 27:21chain performance some techniques
  653. 27:23quickly will go for inventory investment
  654. 27:26uh already we discussed about what are
  655. 27:28the different inventory we are
  656. 27:29maintaining calculation how we can
  657. 27:31manage the percentage of gross or net
  658. 27:34revenue right this can be measured as
  659. 27:37the percentage of gross or net revenue
  660. 27:39means what is the gross and how much
  661. 27:42inventory is adding into that always 10%
  662. 27:45inventory is adding into your gross
  663. 27:47right so that we we can calculate how we
  664. 27:49can optimize it by aligning our
  665. 27:52operation planning with the sales
  666. 27:54department sales and operation planning
  667. 27:57and then we we have some methods value
  668. 27:59stream mapping where we can delete all
  669. 28:01the non value adding activities and we
  670. 28:04can do the value stream mapping quick
  671. 28:06change over single minute exchange of
  672. 28:09die right how quickly we can change over
  673. 28:12from one model to other model canman
  674. 28:15system where we can use red green yellow
  675. 28:18canmen production system where we are
  676. 28:20using those bins how quickly as we are
  677. 28:23depleting the inventory how quickly we
  678. 28:25are replenishing the inventory in the
  679. 28:27bins that visual representation can be
  680. 28:30done inventory efficiency inventory
  681. 28:32turnover we are usually calculating what
  682. 28:35is the cost how quickly we are uh moving
  683. 28:39that inventory in the market right so
  684. 28:40you can Calculate analyed cost of goods
  685. 28:43sold and average inventory investment
  686. 28:46divided by measures how often inventory
  687. 28:49is replaced over the year right already
  688. 28:52we discussed about inventory returns
  689. 28:54days of Supply inventory investment into
  690. 28:57daily cost of goods sold divided by
  691. 29:00number of days needed to sell current
  692. 29:01inventory based on forecasted cost of
  693. 29:04goods sold right how you can optimize
  694. 29:07exclude all those excessive and obsolete
  695. 29:10inventory if today it is not required
  696. 29:12maybe required for after 60 days 90 days
  697. 29:15100 days then don't maintain inventory
  698. 29:17for that again these are some of the
  699. 29:19tools value stream mapping seven waste
  700. 29:21already we defined
  701. 29:23time uh Tim W we defined this s waste
  702. 29:28where transport extra transportation is
  703. 29:30waste extra inventory is waste extra
  704. 29:33motion movement handling of product from
  705. 29:35here to there is waste then your waiting
  706. 29:38time is waste over production of
  707. 29:41something is waste over processing is
  708. 29:44waste and defects you are producing is
  709. 29:46waste obviously so Canin system can be
  710. 29:50implemented to enhance the Jus in time
  711. 29:52on time delivery performance how we can
  712. 29:55measure how many times your orders are
  713. 29:57on time time and maybe you can measure
  714. 30:00how many times your orders are late so
  715. 30:02you can Implement that lean Six Sigma
  716. 30:05right so uh value steam mapping is
  717. 30:08another point where you can find out
  718. 30:10where your uh deliveries are delayed or
  719. 30:13Convent system where you can Implement
  720. 30:15just in time whenever the demand is
  721. 30:17coming from the customer you can quickly
  722. 30:19replenish the inventories and the start
  723. 30:21the manufacturing process right
  724. 30:24forecasting
  725. 30:25accuracy uh usually we are calcul let's
  726. 30:28say this is the actual demand this is
  727. 30:30the forecaster demand so if you
  728. 30:32measuring the average deviation will be
  729. 30:35if you are measuring this whatever is
  730. 30:36the uh deviation is the error in the
  731. 30:39forecasting right so let's say if this
  732. 30:42is the demand one time you predicted
  733. 30:45five extra other time you predicted five
  734. 30:47less if I'll add this this will be zero
  735. 30:50so your deviation will show zero that's
  736. 30:52why we are calculating average absolute
  737. 30:54deviation where we are considering the
  738. 30:56magnitude only one Time 5 extra 1 time
  739. 30:59five less this will be we will take only
  740. 31:01the magnitude that means total 10 is the
  741. 31:04deviation root means square error actual
  742. 31:07demand forecaster demand you will square
  743. 31:11right and maybe you will sum up all the
  744. 31:13items divided by n and that root being
  745. 31:15Square rror this is how you can find
  746. 31:17this this in forecasting we'll discuss
  747. 31:20in detail so whatever actual demand is
  748. 31:23there whatever forecaster demand any
  749. 31:25difference in that is the deviation
  750. 31:27simple concept how we can improve that
  751. 31:29if we are having sales and operation
  752. 31:31planning whatever you are selling sales
  753. 31:33department is directly linked with the
  754. 31:35manufacturing Department right so we can
  755. 31:37do time series analysis we can go for
  756. 31:40regression analysis where we can predict
  757. 31:42our demand in better way
  758. 31:44right lead time how we can calculate the
  759. 31:48lead time lead time is whatever activity
  760. 31:51you are doing when you are starting when
  761. 31:53you are ending so if you are doing any
  762. 31:55non value adding activity in that you
  763. 31:58need to remove that which is not
  764. 32:00required and still you are doing so that
  765. 32:02you can do that quick change over how
  766. 32:04quickly you can change over from one uh
  767. 32:07model to other model on the same
  768. 32:08production line or maybe in molding
  769. 32:11machine you are putting one mold or how
  770. 32:14quickly you are changing the other mold
  771. 32:16right 5S approach will help you to
  772. 32:20implement this we talked about
  773. 32:21[Music]
  774. 32:23C Japanese term where we talked about we
  775. 32:26need to sort the things we need to set
  776. 32:30in
  777. 32:31order we need to shine the workplace we
  778. 32:35need to standardize the process so that
  779. 32:38the efficiency can be managed and we
  780. 32:40need to sustain whatever we are
  781. 32:43implementing right unplanned orders so
  782. 32:46unplanned order usually that you did not
  783. 32:48forecast it and that are coming you need
  784. 32:50to handle those orders but these orders
  785. 32:52are actually you know carrying more cost
  786. 32:55because you did not plan for that so if
  787. 32:58that how you can improve those if you
  788. 33:00can minimize the unplanned orders how
  789. 33:02you can minimize if you are having
  790. 33:04accurate demand prediction right so that
  791. 33:07standard operating procedure you can
  792. 33:10Implement you can effectively implement
  793. 33:12this sales and you know operation
  794. 33:15planning and customer collaboration
  795. 33:17where you can record what is going to be
  796. 33:19the demand from the customer end
  797. 33:21schedule change again if there is any
  798. 33:25change that change can be because of
  799. 33:27shortage in raw material equipment is
  800. 33:29not working let us produce something
  801. 33:31else M power is not there let us use man
  802. 33:35power and use that facility and produce
  803. 33:37something else right impacting
  804. 33:39efficiency this because when we are
  805. 33:41changing obviously the efficiency will
  806. 33:43be lesser in that way so how we can
  807. 33:46ensure less schedule change should be
  808. 33:49there we should ensure total productive
  809. 33:51maintenance where the equipment should
  810. 33:54not be down right and then we can
  811. 33:56Implement 5S housekeeping approach we
  812. 33:59can use mistake proofing pooke system or
  813. 34:03we can use jidoka system already we
  814. 34:05discussed when we discussed about the
  815. 34:07quality tools how we can Implement these
  816. 34:10kind of you know uh lean tools when uh
  817. 34:14those will be error free overdue backlog
  818. 34:17so when your backlog is there why
  819. 34:19backlog will be there because these are
  820. 34:22down your Manpower is not there your raw
  821. 34:24material supply is not there your
  822. 34:26equipments are not working properly
  823. 34:27properly so then your back order will be
  824. 34:30there so that you need to maintain using
  825. 34:33these Technologies again same you can
  826. 34:35Implement material availability how many
  827. 34:38time material is available in your
  828. 34:42storage room you are producing something
  829. 34:44some and then suddenly you are out of
  830. 34:46stock you you you are not having raw
  831. 34:48material supplier because the person who
  832. 34:50supplied the raw vendor who supplied the
  833. 34:52raw material is rejected by your iqc
  834. 34:55team now your what you will do with that
  835. 34:58Manpower with the equipment with
  836. 34:59facility because that will be sitting
  837. 35:01idle right so how you can ensure that
  838. 35:04again same tools you can Implement at
  839. 35:06the vendor location as well so that they
  840. 35:09should have plan maintenance they should
  841. 35:12ensure the minimum breakdown of the uh
  842. 35:15their machinery and uh uh error should
  843. 35:18be avoided excess and obsolete inventory
  844. 35:22should not be there that that will only
  845. 35:24happen when you are keeping excess
  846. 35:26inventory when you are away from the
  847. 35:27customer you are not able to predict
  848. 35:29your demand accurately and usually this
  849. 35:32happens this here we cannot control
  850. 35:34because new products you product uh
  851. 35:36product you are offering you are never
  852. 35:38sure about the supply you are never sure
  853. 35:40about the demand sometime maybe it will
  854. 35:42be taken positively sometime negatively
  855. 35:45so then how you will you need to ensure
  856. 35:47the availability also so that you will
  857. 35:49maintain the inventory customer customer
  858. 35:52service Target what is your customer
  859. 35:54service if you are saying that your
  860. 35:56delivery is delayed that that is one
  861. 35:58performance measure you need to do the
  862. 36:00root cause it's not that your delivery
  863. 36:02partner did the mistake delivery partner
  864. 36:05you gave him 4 hours to deliver that he
  865. 36:08did within 4 hours maybe the delivery
  866. 36:12career partner who is supposed to pick
  867. 36:14the order from the seller within 4 hours
  868. 36:17he did not do that in 4 hours that's why
  869. 36:20the overall that ripple effect was there
  870. 36:23and the delivery was delayed so you need
  871. 36:25to do the root cause analysis why that
  872. 36:27happened perfect order when you are
  873. 36:29filling all the demand on time all are
  874. 36:33whatever you are delivering are accurate
  875. 36:35your order is recorded accurately so
  876. 36:38then it is perfect order called perfect
  877. 36:40order so that mistake proofing should be
  878. 36:42there and standardize the work so that
  879. 36:45efficiency can be maintained what is the
  880. 36:47gross profit margin Revenue Minus cost
  881. 36:50of goods sold right so you can Implement
  882. 36:54lean Six Sigma project balance scorecard
  883. 36:57to improve the overall the efficiency as
  884. 37:00well as the your productivity also
  885. 37:03productivity will be improved your cost
  886. 37:05will be reduced your total uh profit
  887. 37:08will increase return on asset if all the
  888. 37:11assets how much return is there how
  889. 37:14efficiently you are using if one
  890. 37:16production line you are not using 24
  891. 37:18hours and it is made to you know uh to
  892. 37:22use 24 hours so then somewhere your
  893. 37:26assets are under utilized right gross
  894. 37:30margin return on investment already we
  895. 37:32discussed about if you are implementing
  896. 37:33some technology for the betterment then
  897. 37:36what is the return on that technology
  898. 37:38that also you need to record this is one
  899. 37:40quick case we'll go through so ship Bob
  900. 37:43is a leading technology enabled third
  901. 37:46party Logistics provider and they are
  902. 37:49optimizing their supply chain operations
  903. 37:51and they have implemented the balance
  904. 37:53scorecard approach right and we'll see
  905. 37:56how they have picked different kpis
  906. 37:59perfect order rate whatever we are
  907. 38:01delivering should be in complete
  908. 38:02quantity quality there should not be any
  909. 38:06return High perfect order we need to
  910. 38:08maintain this is one criteria they
  911. 38:10picked supply chain cost what is the
  912. 38:13total cost right supply chain cost
  913. 38:15whether you are talking about the
  914. 38:16warehousing cost Transportation cost
  915. 38:18last mile delivery cost you need to
  916. 38:20reduce that right so they developed the
  917. 38:23uh mattress where you can improve they
  918. 38:27went for you know updating their
  919. 38:28warehouses where they implemented
  920. 38:30warehouse management system they
  921. 38:32optimize labor and storage and
  922. 38:34transportation cost as well order
  923. 38:37fulfill rate how we can maximize this so
  924. 38:41that we should not say no to our
  925. 38:43customer that will only happen when you
  926. 38:45are implementing Predictive Analytics
  927. 38:47your software to you know address the
  928. 38:50demand accurately you should not be
  929. 38:52stock out you should not be maintaining
  930. 38:54excess inventory what lead time and then
  931. 38:57supplier relationship so lead time only
  932. 39:00you can minimize when your supplier are
  933. 39:02sitting very next to you so that means
  934. 39:04whenever it is required you can
  935. 39:05Implement that cash toach cycle if lead
  936. 39:08time is minimized let's say if you're
  937. 39:10taking 5 days to deliver the product
  938. 39:12obviously you will get the payment after
  939. 39:145 days if you are delivering the product
  940. 39:16within one day you will generate cash in
  941. 39:19one day right so that means quickly you
  942. 39:21are generating the cash out of selling
  943. 39:23your store so this we can conclude that
  944. 39:27this uh your balance scorecard is a
  945. 39:30comprehensive framework where not only
  946. 39:32the financial measures you can track but
  947. 39:34all the non Financial measures but not
  948. 39:36only with one Department you can include
  949. 39:39all the Departments whether your value
  950. 39:41adding activities or non value adding
  951. 39:43departments but all are working towards
  952. 39:45one single strategy right and that that
  953. 39:49strategy is hitting your vision so you
  954. 39:52need to tap all those kpis develop those
  955. 39:55kpis measure those put the right target
  956. 39:58achievable Target and then you can take
  957. 40:01the initiatives whatever initiatives are
  958. 40:03required so these are the references you
  959. 40:06can go through so that's it thank you
  960. 40:08very much

About this transcript

This page contains the full transcript of Lecture 41 : Supply Chain Performance: Balanced Scorecard Approach (Contd.) by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 6,267 words across 960 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.