Lecture 40 : Supply Chain Performance: Balanced Scorecard Approach — Transcript

by NPTEL IIT Kharagpur · 9,521 words · 1,417 segments · language en · Watch on YouTube

Full transcript

  1. 0:01[Music]
  2. 0:22[Music]
  3. 0:26hello dear friends welcome back to nptl
  4. 0:28online course on Logistics and Supply
  5. 0:30Chain management so today we'll start a
  6. 0:33discussion on another very important
  7. 0:35topic which is balance scorecard right
  8. 0:38so we'll see how we can align the supply
  9. 0:41chain overall performance with certain
  10. 0:44key strategic areas not only the
  11. 0:47financial measures but also we'll try to
  12. 0:49figure out what are the non-financial ma
  13. 0:51measures which we can align with the
  14. 0:54overall strategy vision mission uh of
  15. 0:57the organization right so uh we'll
  16. 1:00proceed in this way we'll talk about in
  17. 1:03generic what are the performance
  18. 1:04measures quantitative qualitative
  19. 1:06measures then we'll talk about balance
  20. 1:09scorecard approach what are the
  21. 1:11different aspects we'll uh try to
  22. 1:13address under balance scorecard and then
  23. 1:16we'll try to see uh balance scorecard in
  24. 1:20uh connection with the supply chain
  25. 1:23right we'll try to develop the supply
  26. 1:24chain performance matrices and then
  27. 1:27we'll see how we can me measure those
  28. 1:30you know uh uh performance uh indexes so
  29. 1:33that we can you know uh implement this
  30. 1:37uh uh balance scorecard approach to
  31. 1:39improve the overall quality of the
  32. 1:42supply chain quality efficiency uh
  33. 1:44Effectiveness in whatever way you are uh
  34. 1:47calculating the performance so that we
  35. 1:49can improve and then we'll end this uh
  36. 1:52discussion with couple of cases right so
  37. 1:54we'll uh spend couple of session on this
  38. 1:56starting with supply chain performance
  39. 1:58measures so basic is what we are
  40. 2:01targeting is your Effectiveness and
  41. 2:04efficiency what you are supposed to
  42. 2:06deliver right uh package of that product
  43. 2:09or Services whatever you are delivering
  44. 2:11and how efficiently you are doing that
  45. 2:13having said that that means you need to
  46. 2:17align all the activities all the
  47. 2:19functional areas throughout all the
  48. 2:22stakeholders involved in that supply
  49. 2:24chain from the starting to the end point
  50. 2:26right and when you are aligning those
  51. 2:29activities not only you need to perform
  52. 2:31those activities effectively to deliver
  53. 2:33the product but also the cost effective
  54. 2:36way right so efficiency we need to
  55. 2:39Target as well right so again if I'll
  56. 2:43just draw the again the main
  57. 2:46stakeholders raw material suppliers are
  58. 2:49coming from here and then we
  59. 2:53are having the manufacturers
  60. 2:57co-manufacturers and then finally we we
  61. 3:00have the
  62. 3:01customers right through the distribution
  63. 3:04Network right or maybe you can see your
  64. 3:07distribution agency can also be
  65. 3:11sometimes considered as
  66. 3:14the customer right and uh this is how it
  67. 3:18is happening and sometimes what we are
  68. 3:19doing we are processing the returns as
  69. 3:22well when we are not happy with the
  70. 3:24products we are processing the returns
  71. 3:25as well so this is very basic uh supply
  72. 3:28chain structure we are was discussing
  73. 3:30from the starting right now when we are
  74. 3:33talking about Supply Chain management
  75. 3:35Effectiveness and efficiency just I'll
  76. 3:38briefly
  77. 3:41I'll again just touch these points first
  78. 3:44point in efficiency and Effectiveness is
  79. 3:47acquisition of the raw material right so
  80. 3:50acquisition means right raw material
  81. 3:52should be there right raw material in
  82. 3:54right quantity at right place right time
  83. 3:57right that is Effectiveness and
  84. 3:59efficiency how you can minimize the
  85. 4:03overall cost of acquiring that ownership
  86. 4:06of the raw material right so first thing
  87. 4:08is if I'll say cost of raw material is
  88. 4:11the first component when we'll design
  89. 4:14the overall cost function so raw
  90. 4:16material cost is the first one then we
  91. 4:18are transporting that raw material to
  92. 4:21manufacturer so Transportation cost is
  93. 4:24the next element in that how effectively
  94. 4:26how efficiently we are transporting that
  95. 4:29again depends upon the routing depends
  96. 4:32upon the vehicle
  97. 4:36utilization depends upon the mode of
  98. 4:39Transport you are picking and other
  99. 4:41factors related to Transportation right
  100. 4:43so then what we are doing we are storing
  101. 4:46in between the storage houses that raw
  102. 4:50material we are maintaining the
  103. 4:52inventory because if we are not doing
  104. 4:54the just in time of system or even in
  105. 4:57just in time of system we are
  106. 4:58maintaining uh inventory for very very
  107. 5:01temporary uh period of time right so
  108. 5:04then again the storage cost will be
  109. 5:07there storage means whenever we are
  110. 5:09talking about storage handling will also
  111. 5:11come into that again then now the second
  112. 5:14stage manufacturing converting your raw
  113. 5:17material into finished one that
  114. 5:19manufacturing cost will be added right
  115. 5:23so throughout this discussion of balance
  116. 5:25scorecard we'll keep all these points
  117. 5:28from where the C cost is you know coming
  118. 5:31right you need to configure this cost
  119. 5:33function then manufacturer what is doing
  120. 5:36are delivering the finished goods to the
  121. 5:39distributor then again we are managing
  122. 5:42the
  123. 5:43warehousing so warehousing cost will be
  124. 5:45there keeping the inventory track
  125. 5:48handling all that will do that in
  126. 5:51warehousing only right so sometimes we
  127. 5:53are doing the extra packaging sometime
  128. 5:55we are doing kitting right so that will
  129. 5:58also be the cost warehousing cost right
  130. 6:01and then the final the distribution cost
  131. 6:03you can consider it as the end mile
  132. 6:06distribution cost so these basically
  133. 6:09when we'll design the cost function
  134. 6:11these different components will be there
  135. 6:13when we are say saying efficiently so
  136. 6:16that means we need to minimize the cost
  137. 6:19either your raw material acquisition how
  138. 6:22how you can minimize the raw material
  139. 6:24acquisition cost by negotiating with the
  140. 6:26suppliers how you can effectively
  141. 6:28acquire the material by by negotiating
  142. 6:30the quality by negotiating the variety
  143. 6:32right when having said that negotiating
  144. 6:35the quality that means we have done that
  145. 6:38vendor rating whosoever is the best
  146. 6:40vendor you need to get the raw material
  147. 6:43from that vendor maximum raw material
  148. 6:45how you can you know uh Empower your
  149. 6:48vendors in that process you can uh
  150. 6:50improve their technology you can improve
  151. 6:52their skills their processes how they
  152. 6:54are producing the raw material so that
  153. 6:56way we have discussed in the vendor
  154. 6:58rating format and we have discussed in
  155. 7:00the uh supply chain coordination as well
  156. 7:02how you can improve the performance and
  157. 7:04efficiency of the your stakeholders
  158. 7:06right so this is see we one we are
  159. 7:09discussing on cost another end we are
  160. 7:11discussing on the effectiveness quality
  161. 7:13other parameters right then we are
  162. 7:15talking about if we'll if we want to
  163. 7:17minimize the manufacturing cost maybe
  164. 7:20we'll try to produce in bulk right so
  165. 7:23that the per unit cost can be reduced
  166. 7:26because if you are producing 50 units
  167. 7:29and if you are producing 5,000 units per
  168. 7:31unit cost will be different because you
  169. 7:33are enjoying the economies of scales
  170. 7:36right so that but then if you are
  171. 7:38producing 5 unit 50 unit or 5,000 units
  172. 7:42so then again the inventory cost will be
  173. 7:45varing in that way if you're managing
  174. 7:47more inventory but if you can ensure the
  175. 7:50consumption of the inventory in the
  176. 7:51market then it is fair enough right so
  177. 7:54this is how you can minimize talking
  178. 7:56about distribution how end mile delivery
  179. 7:59you can Reduce by maybe electrical
  180. 8:01Vehicles you are if you are doing the
  181. 8:03delivery using that maybe you are doing
  182. 8:06delivery by bicycles or some other way
  183. 8:09where you can minimize the total cost so
  184. 8:12we have discussed this in detail how we
  185. 8:15can minimize the transportation cost how
  186. 8:17we can manage the effectiveness in
  187. 8:19during transportation in warehousing
  188. 8:22while picking our raw material suppliers
  189. 8:25then we discussed all different sessions
  190. 8:27we we have done till now right so this
  191. 8:30is the brief scenario how when we are
  192. 8:33talking about you know productivity and
  193. 8:35efficiency we need to focus on this so
  194. 8:37again there is no need now to explain on
  195. 8:40this key components ontime delivery
  196. 8:42stock availability order accuracy
  197. 8:44production these are few measures right
  198. 8:47so the complete picture is there when
  199. 8:49you are talking about uh quick delivery
  200. 8:53so from the Fulfillment center that mean
  201. 8:55it it is the performance measure related
  202. 8:58to your warehousing right how quickly
  203. 9:01Warehouse is recording the order and
  204. 9:04then picking packing the order and
  205. 9:06finally making the delivery to the End
  206. 9:08customer so that this is one component
  207. 9:11related to your Warehouse only but when
  208. 9:13we will keep on you know discussing
  209. 9:16different functional units different
  210. 9:17stakeholder this these uh measures will
  211. 9:20change right so because I have picked
  212. 9:22only few points for examples right so
  213. 9:26then you can you know uh we can we have
  214. 9:28discussed all those stakeholders in
  215. 9:30detail you can pick those performance
  216. 9:32measures and then accordingly you can
  217. 9:34design the balance scorecard for all
  218. 9:36that so obviously we have some
  219. 9:38qualitative measures sometimes we don't
  220. 9:41we really cannot you know quantify some
  221. 9:43things like how I am feeling about the
  222. 9:46product your experience about the
  223. 9:48delivery so maybe then you cannot you
  224. 9:50know exactly quantify in terms of
  225. 9:53numbers so then you are give you are you
  226. 9:55know getting the feedback whe uh
  227. 9:58satisfactory or less satisfactory or you
  228. 10:01know uh resonance after purchasing or
  229. 10:04after salale Services right so those are
  230. 10:07some of the qualitative measures you are
  231. 10:08recording quantitative on time delivery
  232. 10:11whether you are 5 minutes late or you
  233. 10:13are 5 minute early right that is your
  234. 10:16quantitative measure quality defects how
  235. 10:18many product complaints are coming back
  236. 10:20to you that is another defect so you can
  237. 10:23actually record in time right so some
  238. 10:25some other measures are there
  239. 10:27flexibility how quickly you can change
  240. 10:29change over if you are producing Model A
  241. 10:32then you need to change over to model B
  242. 10:34how quickly in 10 minutes you are doing
  243. 10:36that in 5 minutes you are changing over
  244. 10:38from one model to another model that
  245. 10:40means your manufacturing is very
  246. 10:42flexible right this is only I'm talking
  247. 10:44about manufacturing so this flexibility
  248. 10:46can be associated with warehousing as
  249. 10:48well this flexibility can be associated
  250. 10:50with the transportation network if today
  251. 10:52I need maybe uh small size packet or
  252. 10:56maybe same product small size how C you
  253. 10:59can deliver the order tomorrow I need
  254. 11:01bigger size maybe today I'm uh let's
  255. 11:04take the example only family two three
  256. 11:06members are there and we we want to
  257. 11:08order cake so very small size cake you
  258. 11:11are ready to deliver your career partner
  259. 11:13is ready to deliver he's having that
  260. 11:15capacity your uh uh cake manufacturer
  261. 11:18that Bakery is ready to deliver tomorrow
  262. 11:20I have invited maybe 100 people for the
  263. 11:22birthday purpose right so then you need
  264. 11:24that bigger cake whether you're
  265. 11:26manufacturing that Bakery is uh you know
  266. 11:29flexible enough to manufacture that size
  267. 11:31of cake so that is your uh just one
  268. 11:35example talking about quantitative
  269. 11:38measures some measures we can directly
  270. 11:41attach with the financial measures and
  271. 11:43some we cannot attach with the financial
  272. 11:45measures so non Financial measures that
  273. 11:48you you actually you are calculating
  274. 11:50very important but somewhere indirectly
  275. 11:52leading to your you know performance
  276. 11:54only when we are saying performance that
  277. 11:56means either you are talking about you
  278. 11:59are making enhancing the customer
  279. 12:01experience then what will happen
  280. 12:03customer will be loyal then what will
  281. 12:05happen customer will go for more
  282. 12:07frequent purchases that means again you
  283. 12:09can attach with the financial measure
  284. 12:10your profit is increasing your market
  285. 12:12share is increasing Financial direct
  286. 12:14Financial me what is the uh return uh on
  287. 12:19investment that is direct Financial uh
  288. 12:22you know measure how much you are
  289. 12:23investing how much you are getting what
  290. 12:25is the profit again direct Financial
  291. 12:27measure right how much you are saving in
  292. 12:29inventory again direct Financial me what
  293. 12:31is the inventory cost again direct
  294. 12:33Financial measure how much is the
  295. 12:35purchase order cost uh raw material
  296. 12:37acquisition cost again Financial measure
  297. 12:40non Financial measure your uh like
  298. 12:43quality of the product right so then you
  299. 12:45can see how you are ontime delivery of
  300. 12:48the product right how you are ensuring
  301. 12:50quality how you are ensuring delivery so
  302. 12:52that is non Financial measures so let us
  303. 12:55quickly go through the financial
  304. 12:57measures so obviously we have some fixed
  305. 13:00and operational cost and we want to find
  306. 13:03out whenever we are calculating or we
  307. 13:05are you know we are defining our kpis
  308. 13:08why we are doing this there are two
  309. 13:11basic reason one is we want to find out
  310. 13:14where we are our performance level right
  311. 13:17now where we are what is our level right
  312. 13:20so maybe we are standing somewhere here
  313. 13:23then what is the Benchmark in that
  314. 13:25industry where is the leader of that
  315. 13:27industry maybe somewhere here here so
  316. 13:30this is the gap how we can bridge that
  317. 13:32Gap so two basic purpose first is we
  318. 13:35need to measure our current performance
  319. 13:38and where we want to be in next maybe 5
  320. 13:41years 10 years down the line or maybe
  321. 13:43smaller time period can be there
  322. 13:45depending upon what you are dealing with
  323. 13:47right so you need to pick the Benchmark
  324. 13:50this is the basic measures so we can
  325. 13:52just go through raw material cost
  326. 13:55whatever raw material cost you are
  327. 13:56acquiring so whatever you are paying not
  328. 13:59only the raw material cost the storage
  329. 14:01cost of raw material the transportation
  330. 14:03of raw material the handling of the raw
  331. 14:05material means total cost of ownership
  332. 14:08maybe it is included here if it is not
  333. 14:10included you can see total cost of
  334. 14:13ownership how much you are paying to get
  335. 14:17that raw material into your Factory and
  336. 14:19then you are means on the production
  337. 14:21line after that once production is
  338. 14:23starting then you know it will be under
  339. 14:26your manufacturing cost and until that
  340. 14:29your total cost of ownership revenue
  341. 14:32from the goods sold how many Goods you
  342. 14:35are selling and what Revenue you are
  343. 14:36getting out of that right activity based
  344. 14:39cost so if you are talking about in
  345. 14:42Inventory management how much Inventory
  346. 14:44management is adding to your overall
  347. 14:46cost if you are talking about logistics
  348. 14:48cost distribution Transportation
  349. 14:50warehousing cost how much you are adding
  350. 14:53to overall cost like we discussed in the
  351. 14:56initial session in India the logistics
  352. 14:59cost is around 14 to 15% now what is the
  353. 15:02purpose of calculating this see the
  354. 15:06global average is somewhere 8 to
  355. 15:0810% if we talk about the developed
  356. 15:11Nation they are maintaining somewhere to
  357. 15:136 to 7% that means that means we are
  358. 15:17spending extra on Logistics activity we
  359. 15:21need to reduce this heavily we need to
  360. 15:24do some optimization we need to go for
  361. 15:27picking the alternative route we need to
  362. 15:29pick for alternative transportation mode
  363. 15:31we need to update our warehouses go for
  364. 15:33updation maybe uh automated warehouses
  365. 15:36inventory minimization whatever required
  366. 15:38to minimize the cost because still we
  367. 15:40are spending somewhere 6 to 7% extra
  368. 15:44than what of other players in the market
  369. 15:47they are spending if you are spending 7%
  370. 15:50extra that means that somewhere 7%
  371. 15:53directly profit you are reducing so your
  372. 15:56other foreign players will be cost
  373. 15:58efficient then they will be delivering
  374. 16:00the product on lesser margin and
  375. 16:03obviously then how you will compete
  376. 16:05inventory holding cost will come into
  377. 16:07that the carrying cost right during
  378. 16:09handling you are sometime damaging the
  379. 16:11product as well that cost will also be
  380. 16:13there Transportation cost already we
  381. 16:15talked about whether we you are going
  382. 16:18through air you are going through ship
  383. 16:20you are going through Road and we have
  384. 16:22seen that ship is the most cheap and
  385. 16:25sustainable sustainable way to transport
  386. 16:27your product but then then whether we
  387. 16:30have that uh you know infrastructure uh
  388. 16:33to go for that then cost of expired
  389. 16:37perish Goods so what if goods are
  390. 16:40expiring in your Warehouse in your
  391. 16:42storage center before producing that
  392. 16:45your raw material uh is expired because
  393. 16:48of the perishable nature of the product
  394. 16:51or in the final distribution fulfillment
  395. 16:53center the uh expir product expired
  396. 16:57because you could not
  397. 16:59uh you know move that inventory in the
  398. 17:01market you could not ensure the sales of
  399. 17:04that product right penalty for incorrec
  400. 17:08filling of the orders if some raw
  401. 17:11material is incorrectly coming to you
  402. 17:14obviously uh issues related to Quality
  403. 17:17and then if still raw material suppliers
  404. 17:20are supplying to you that means it is
  405. 17:21incorrectly filled so that cost will be
  406. 17:23there either you will be segregating you
  407. 17:25will be sending back so then again
  408. 17:28Transportation cost because this is
  409. 17:29system cost this is not only obviously
  410. 17:31your vendor will bear that cost but
  411. 17:34again delay will be there and then you
  412. 17:36were expecting to Le the lot today and
  413. 17:39that lot reached but that is in not in
  414. 17:41good shape in good quality so what you
  415. 17:43will do you will return back but then
  416. 17:45your whole production line will stop how
  417. 17:47you will maintain the ontime delivery
  418. 17:50what you will do forget about the on
  419. 17:52time delivery what you will do with that
  420. 17:55th000 manow working on that
  421. 17:57manufacturing line credit for incorrect
  422. 18:01uh field said that that is already there
  423. 18:03if you are doing segregation or
  424. 18:05maintaining the raw material so
  425. 18:07obviously uh your vendors will pay and
  426. 18:09cost of goods returned by the customer
  427. 18:13if customers are returning the order
  428. 18:15because of Any failure any defect any
  429. 18:18quality issue any functionality issue
  430. 18:20man manufacturing related issue
  431. 18:22packaging related issue delivery related
  432. 18:24issues what is the cost right so that
  433. 18:27full exercise is gone right credit for
  434. 18:30Goods return to supplier so that also
  435. 18:33they need to credit that now let's talk
  436. 18:35about the non Financial measures uh
  437. 18:38quickly so cycle time cycle time
  438. 18:42basically for any activity we can say
  439. 18:45that how much time is required to
  440. 18:47deliver this session maybe 35 40 minutes
  441. 18:51right so but that is the actual time
  442. 18:53let's say the complete time when you
  443. 18:55will uh go through this lecture record
  444. 18:58lecture maybe 42 minutes but when I
  445. 19:01recorded maybe I recorded for 44 or 45
  446. 19:04minutes because of some interruptions or
  447. 19:06something like happened so video editing
  448. 19:08team they did that editing part and then
  449. 19:10it is reduced to that much right so how
  450. 19:13much cycle time when we start if we are
  451. 19:16talking about the video recording right
  452. 19:18so that 45 46 time is the cycle time but
  453. 19:21actual time in the end maybe only 40
  454. 19:23minutes okay so for any activity if we
  455. 19:26are placing order when we are receiving
  456. 19:28order again cycle time okay so then uh
  457. 19:32we can divide into two types supply
  458. 19:35chain lead time right supply chain to
  459. 19:39transform the raw material into finished
  460. 19:41one and then to ship that finished
  461. 19:43product to the End customer that
  462. 19:45complete time required is the lead time
  463. 19:49today if you are placing the order you
  464. 19:51are placing order some for some
  465. 19:52customized product let's say so then
  466. 19:55once your order will reach only then I
  467. 19:57will start producing product right that
  468. 20:00means because of your inputs are
  469. 20:02important to prepare the final product
  470. 20:04so that production time will be there
  471. 20:07and then it will take delivery will take
  472. 20:08some time order to delivery if I'm
  473. 20:10having in house the delivery and then
  474. 20:13how much time it is required to you know
  475. 20:15ship the product from the warehouse or
  476. 20:17the Fulfillment center to your
  477. 20:20location customer service level so
  478. 20:23customer service level we talked about
  479. 20:25you know customer services level in uh
  480. 20:28quality measures are also there for
  481. 20:30customer services what variety they are
  482. 20:32looking for again qualitative measures
  483. 20:35what level of innovation they need for
  484. 20:37that the experience of the delivery what
  485. 20:40are their expectations right lead time
  486. 20:43how much time they can wait this is
  487. 20:45quantitative measures right so these are
  488. 20:47some of the uh parameters we have
  489. 20:50designed from customer services level
  490. 20:52required order fill rate so how quickly
  491. 20:56you are filling the order orders coming
  492. 20:59from the customer from your existing
  493. 21:01stock that means customer plays the
  494. 21:04order and your fulfillment center or
  495. 21:06retailer or wherever you are maintaining
  496. 21:08the inventory you have that inventory
  497. 21:11and you are quickly moving the inventory
  498. 21:13that is order fill rate stock out rate
  499. 21:16how many times you were out of stock if
  500. 21:18100 orders were placed 95 you filled on
  501. 21:22time but for five orders you took maybe
  502. 21:25one day or two days that means your
  503. 21:27order fill rate is 95% stock out rate is
  504. 21:325% and maybe sometime you may lose the
  505. 21:35uh sales as well because if you are not
  506. 21:38maintaining the inventory someone else
  507. 21:39must be maintaining the inventory so
  508. 21:41customer will shift to some other back
  509. 21:44order level back order level means you
  510. 21:47have the order pending but you have not
  511. 21:50uh sufficient inventory so once
  512. 21:52inventory will come you will clear the
  513. 21:54back order usually now if you talk about
  514. 21:57the automobile industry maruti if you go
  515. 21:59for purchasing any car or Hyundai or
  516. 22:03Toyota so usually they are saying that 3
  517. 22:05months time period is there waiting time
  518. 22:07period is there sometime they are saying
  519. 22:096 months sometime they are saying one
  520. 22:10year waiting time right actually this is
  521. 22:14part of their marketing strategy also if
  522. 22:16they are saying that one year waiting
  523. 22:17time that means you customer will feel
  524. 22:20that this product is in great demand so
  525. 22:23that's why you know that much waiting
  526. 22:25time period is there but still 2 months
  527. 22:273 months waiting time is there because I
  528. 22:30told you this automobile industry in one
  529. 22:33model particular model maybe more than
  530. 22:36200 variants are there so maintaining
  531. 22:39for each type different type of model
  532. 22:42inventory that means minimum one
  533. 22:44inventory you will maintain that means
  534. 22:46minimum 200 cars in same make you will
  535. 22:50uh maintain the inventory 200 Cars if we
  536. 22:53will talk about Grand barara right so
  537. 22:56200 you just calculate the cost of
  538. 22:58inventory and that I'm talking about
  539. 23:00only maintaining one piece of the
  540. 23:02product right so because custo regular
  541. 23:06orders which are lying somewhere in the
  542. 23:08middle you may get frequently because
  543. 23:10they are preparing it on frequent basis
  544. 23:12most of the customers depending upon
  545. 23:14their Predictive Analytics they are
  546. 23:16buying that and then they are predicting
  547. 23:17the demand so but talking about the
  548. 23:20extreme model Top Model maybe that much
  549. 23:23demand will not be there okay so then
  550. 23:26probability of ontime delivery so What
  551. 23:29proportion of customer demand you are
  552. 23:31meeting on time what is the probability
  553. 23:34if you will place order today and one
  554. 23:36when it will be delivered right so that
  555. 23:38way you can calculate inventory levels
  556. 23:41so usually we are inventory we discussed
  557. 23:43about either maintaining raw material
  558. 23:45work in progress or F finished goods or
  559. 23:48spare parts sometimes we are maintaining
  560. 23:51the inventory of the rejected material
  561. 23:53also returns also this is another
  562. 23:57inventory this is not completely
  563. 23:59rejected maybe you delivered the product
  564. 24:02something uh uh during your delivery uh
  565. 24:05you brought your cor partner broke the
  566. 24:07product some component so that means the
  567. 24:09Complete product is not a rejected one
  568. 24:12still you can use that product only you
  569. 24:14need to replace the component so then
  570. 24:17that inventory also you are maintaining
  571. 24:19here only you need to make the balance
  572. 24:21when we are talking about inventory
  573. 24:23levels you should not be stock out and
  574. 24:25all the time you should not maintain the
  575. 24:27excess inventory that's the only measure
  576. 24:29how you can measure the inventory levels
  577. 24:32resource utilization usually with the
  578. 24:35organization we have variety of
  579. 24:37resources we have talked about five M of
  580. 24:40resources man money machine material
  581. 24:44methods right other than that also we
  582. 24:46are using different resources but we can
  583. 24:48generalize in these five different
  584. 24:51categories so let's say like we'll take
  585. 24:55example of IIT kakur only any
  586. 24:57educational Institution so now uh almost
  587. 25:01for two or two 2 and a half months uh we
  588. 25:04have vacation period is going on right
  589. 25:06from maybe we started somewhere in the
  590. 25:08uh middle of May it will go up to July
  591. 25:11end right so all those lecture theaters
  592. 25:16Halls all those rooms facilities we are
  593. 25:18using now lying vacant we are not
  594. 25:21utilizing that capacity right unutilized
  595. 25:24resources right so that means those
  596. 25:27resources are there we can utilize those
  597. 25:30and still you know come with some
  598. 25:32profits some margin maybe we can add
  599. 25:34into the uh Institute uh you know uh
  600. 25:38funds and if we use those resources how
  601. 25:41we can use those resources this is one
  602. 25:43example when we don't have regular
  603. 25:45classes we can go for online courses
  604. 25:48like npdl is doing that during that time
  605. 25:50so still we can use this facility we can
  606. 25:52record the lectures and we can you know
  607. 25:55uh then we can you know serve the these
  608. 25:58services to the uh maybe distant
  609. 26:02students who are not here who cannot
  610. 26:04Avail these facilities and then they can
  611. 26:06you know go through these lectures and
  612. 26:08go through these videos so I mean we we
  613. 26:11can find out alternative ways how we can
  614. 26:14utilize those unutilized resources
  615. 26:17during that time so manufacturing
  616. 26:20process again if uh what machines we are
  617. 26:23using we are using different types of
  618. 26:25equipments right in the manufacturing
  619. 26:27process let's say we are manufacturing
  620. 26:30two different models a is in big demand
  621. 26:32B is in less demand but still we have
  622. 26:35separate
  623. 26:36manufacturing uh uh that production line
  624. 26:39for manufacturing your B product right
  625. 26:41but because production demand is not
  626. 26:43that high so almost we are running that
  627. 26:46production line daily maybe 78 hours
  628. 26:48only but a we are running 24 into 7
  629. 26:51right so that means that b production
  630. 26:53line we cannot you know remove that
  631. 26:56production line completely we cannot
  632. 26:58give that production line to something
  633. 26:59else right so what we can do is is there
  634. 27:02any model which can be very very closely
  635. 27:05related to B that so that minimum change
  636. 27:07over time is required and we can combine
  637. 27:10with some model C or D or any other
  638. 27:12model Right Storage
  639. 27:15resources if warehousing you have
  640. 27:17maintained that capacity of maybe you
  641. 27:20can store 100 ton of material but all
  642. 27:22the time somewhere on average you are
  643. 27:24storing 70 75 T that means fully you are
  644. 27:27not utilizing the capacity logistic
  645. 27:29resources we book the truck from kakur
  646. 27:32to Kolkata on the way back from Kolkata
  647. 27:35to kakur we are not utilizing that
  648. 27:37capacity how we can you know utilize in
  649. 27:40a better way so that the that can be
  650. 27:43ensured full utiliz can be similarly we
  651. 27:45go with the human resources or financial
  652. 27:47resources right if Financial Resources
  653. 27:51example is inventory always you are
  654. 27:53maintaining 10 CR inventory within your
  655. 27:56organization in different ways either
  656. 27:58raw material semi-finished or finished
  657. 28:01right so that means that 10 CR is the
  658. 28:04amount you are not utilizing just
  659. 28:07imagine if you'll deposit that amount
  660. 28:09somewhere in the bank you are doing
  661. 28:11nothing right even then you'll get 4% 5%
  662. 28:14right so if you'll invest somewhere in
  663. 28:17the markets then returns depends upon
  664. 28:19your capability how much you can
  665. 28:21generate right so that is one source
  666. 28:24qualitative measures customer
  667. 28:26satisfaction user usually you are
  668. 28:28delivering swii is delivering food to
  669. 28:31you jto is delivering food to you then
  670. 28:33they are asking for some your experience
  671. 28:35right maybe food quality food taste
  672. 28:38hygiene packaging uh the career partner
  673. 28:41who delivered the food package wearing
  674. 28:42the gloves or not so cut see how he was
  675. 28:46dealing with you payment was done
  676. 28:48smoothly if you canceled the order where
  677. 28:51your payment is you know returned back
  678. 28:53to you so these are some of the points
  679. 28:55you qualitative measures you can just
  680. 28:57record customer complaints number of
  681. 29:00complaints coming from the customer
  682. 29:02related to maybe delay delivery related
  683. 29:04to maybe some other things right so that
  684. 29:07also you can record customer response
  685. 29:09time how quickly you are responding if
  686. 29:13any query is there right from the
  687. 29:16customer right product quality for
  688. 29:19Quality like I told you food quality you
  689. 29:20can rate and then when next time Jato
  690. 29:24whenever you will search uh Jato so that
  691. 29:27restaurant means most of the customers
  692. 29:29are rating at the highest so that
  693. 29:31restaurant will be reflected first based
  694. 29:33on you know rating so that usually this
  695. 29:37the beauty of e-commerce you know
  696. 29:39website and uh Market is that you can go
  697. 29:43for the genu rating of the suppliers
  698. 29:46right so delivery experience already
  699. 29:48talked about and Order accuracy that I
  700. 29:51ordered something and I I got the same
  701. 29:53order that means order were accurately
  702. 29:56uh recorded right so talking about
  703. 29:59either food if I gave some maybe uh you
  704. 30:02know cooking instruction that it should
  705. 30:03be less spicy so whether you maintain
  706. 30:06those instructions you implemented or
  707. 30:08not so that is order accuracy you can
  708. 30:11and then deliver the correct order in
  709. 30:13time let's talk about now the balance
  710. 30:16score card right this is a kind of tool
  711. 30:20which we can use to record all the
  712. 30:22performance measures whether Financial
  713. 30:25or non-financial performance measures
  714. 30:27right so it gives gives us the you know
  715. 30:30uh comprehensive framework right
  716. 30:33comprehensive framework which helps to
  717. 30:35align the business activities to their
  718. 30:38main vision and strategy what is your
  719. 30:41vision and Mission what is your strategy
  720. 30:43let's say if you want to be uh
  721. 30:46responsive in the market so that means
  722. 30:49to be responsive whatever customer is
  723. 30:52demanding you need to deliver that
  724. 30:54quickly whatever feature they are
  725. 30:56demanding whatever color variety flavor
  726. 30:59in whatever way they are giving their
  727. 31:01inputs and if you are saying that
  728. 31:03whatever inputs you will give they'll
  729. 31:06provide you the customized services so
  730. 31:08that means that responsive supply chain
  731. 31:11manufacturing or order fulfillment is
  732. 31:13happening right throughout the chain you
  733. 31:16need to supply chain you need to
  734. 31:17maintain the responsiveness so that will
  735. 31:20improve if that common thread of vision
  736. 31:22and strategy is there so internal and
  737. 31:24external communication internal within
  738. 31:26the organization external means with
  739. 31:28your stakeholders your warehousing
  740. 31:30partner distribution partner
  741. 31:32Transportation partner your uh suppliers
  742. 31:36so this was developed by Robert and dbit
  743. 31:38and they included Financial as well as
  744. 31:41non-financial measures into four
  745. 31:43different perspective where they
  746. 31:44included Financial perspective as one uh
  747. 31:48performance key performance area where
  748. 31:50you can record different kpis then
  749. 31:52customer is another key performance area
  750. 31:54where again you can record different
  751. 31:56kpis and you can improve on that
  752. 31:58internal business process how you are
  753. 32:00doing internally either you are
  754. 32:03manufacturing or you are storing how
  755. 32:05efficiently you are storing or you are
  756. 32:07pack doing the packaging how efficiently
  757. 32:09you are doing the packaging learning and
  758. 32:11growth how you are ensuring that your
  759. 32:13organization is sustainable if any new
  760. 32:16technology is coming you are not getting
  761. 32:18obsolete your Manpower is not getting
  762. 32:20obsolete you are continuously you are
  763. 32:23continuously improving their skills as
  764. 32:25well right so this is a holistic
  765. 32:27approach
  766. 32:28which will tie all the organizations all
  767. 32:30the stakeholders in that supply chain
  768. 32:32right just go through the center heart
  769. 32:35of this model is framework is vision and
  770. 32:38strategy like I told you if you want to
  771. 32:40be cost efficient or you want to be
  772. 32:42responsive that will be your heart your
  773. 32:44vision your vision in the market is to
  774. 32:47compete with the other players based on
  775. 32:50cost to compete with other players based
  776. 32:52on cost based on responsiveness based on
  777. 32:55quick delivery whatever can be there
  778. 32:58right so all these measures we are
  779. 33:02defining the objective for each whatever
  780. 33:05strategy we have Vision we have we'll
  781. 33:07Define objectives we'll measure that
  782. 33:10objective how we will how we can measure
  783. 33:12that right some quantitative or
  784. 33:14qualitative measures then what are the
  785. 33:16targets initially and then what are the
  786. 33:18initiatives we are taking to implement
  787. 33:21that strategy so these four things we
  788. 33:24are defining for each set of strategy
  789. 33:27each each objective right so talking
  790. 33:30about the these four different
  791. 33:32perspective customer is one that means
  792. 33:35to achieve our vision how should be
  793. 33:38appear to our customer how our customers
  794. 33:41are evaluating us right so let's say
  795. 33:44when we are talking about customer we
  796. 33:46want to talk we want to minimize the
  797. 33:49delivery
  798. 33:51time now objective is to minimize the
  799. 33:54delivery time so how you will measure
  800. 33:57the deliver time maybe you are recording
  801. 33:59the lead time that is how you can
  802. 34:01measure the delivery time lead time when
  803. 34:03I'm placing the order and when you are
  804. 34:05getting the order right then targets
  805. 34:07what are the targets right now maybe we
  806. 34:09are delivering in 5 to 6 days I I want
  807. 34:12to ensure in two to 3 days that is my
  808. 34:15target or maybe firstly from 5 to 6 days
  809. 34:19you want to reduce to 4 to 5 days and
  810. 34:21then one from four to five days you want
  811. 34:23to make it two to three days and from
  812. 34:26two to three days maybe you will ensure
  813. 34:28the single day delivery right or maybe
  814. 34:31then you will go for same day delivery
  815. 34:33so this is means not ending process this
  816. 34:37keep on we'll keep on doing again and
  817. 34:40again we'll keep on improving ourself
  818. 34:42right so this will be Target now
  819. 34:45initiatives what you will take the
  820. 34:47initiative right so initiative means if
  821. 34:50I'm saying that let's take the example
  822. 34:52of 2 to 3 days so when I'm saying that 2
  823. 34:55to 3 days whenever customer is placing
  824. 34:57the order the career partner who is
  825. 35:00picking that final product from any
  826. 35:03retailer or sales point should ensure
  827. 35:06that he is picking within 4
  828. 35:08hours then the delivery to the nearest
  829. 35:11Hub should be done in another maybe 6
  830. 35:15hours then maybe from that Hub to the
  831. 35:19nearby Hub to the customer maybe within
  832. 35:2124 hours it should be delivered then
  833. 35:24sorting and you know delivering the
  834. 35:26message to the customer
  835. 35:28maybe it will take no not so from
  836. 35:32the main uh Warehouse let's say this is
  837. 35:36in Delhi and from Delhi to uh Kolkata we
  838. 35:40are saying that 24 hours right it should
  839. 35:43be reached from Kolkata to nearby kakur
  840. 35:48right it may take another 5 to 6 hours
  841. 35:52then from 5 to 6 hours how we can ensure
  842. 35:54two 2 hours delivery this is how we can
  843. 35:57plan when we are talking about within 2
  844. 36:00days delivery so that means these are
  845. 36:03initiatives so for this career partner
  846. 36:07initiative is within 4 hours you need to
  847. 36:10pick the
  848. 36:11order and then it should be delivered to
  849. 36:13nearby Hub so these are the target so
  850. 36:15let's talk about then learning and
  851. 36:17growth so let's say we have some
  852. 36:20unskilled
  853. 36:23workers we have semiskilled workers
  854. 36:29and we have skilled
  855. 36:31workers now what is happening once if
  856. 36:35I'm working for Organization for longer
  857. 36:37time and then I start experiencing that
  858. 36:39there is no learning there is no growth
  859. 36:42my career path I'm not able to look so
  860. 36:44that means I'll feel bored I'll start
  861. 36:46applying some other organization so how
  862. 36:48you can engage your or uh people in the
  863. 36:51organization if your unskilled people
  864. 36:53are there your target objective should
  865. 36:55be how you can make them more skilled
  866. 36:57measures are you measure the skill level
  867. 37:00their technically technical efficiency
  868. 37:02their managerial efficiency how they are
  869. 37:05doing the things maybe you can sort them
  870. 37:08depending upon different functional
  871. 37:10units someone may be good with the
  872. 37:12marketing someone may be good with the
  873. 37:14purchase someone may be good with the
  874. 37:15manufacturing quality R&D whatever
  875. 37:19different functional units are then your
  876. 37:21target should be how you can move them
  877. 37:24from unskilled to Skilled those who are
  878. 37:27moved to unskilled to semiskilled the
  879. 37:29next Target is move them to Skilled and
  880. 37:32skilled is nothing like today I'm
  881. 37:34skilled for this maybe teaching this
  882. 37:36course tomorrow something else will be
  883. 37:38there in this course so again we need to
  884. 37:41you know res skill ourselves so skill
  885. 37:43Skilling is the kind of process which is
  886. 37:46never ending process learning is never
  887. 37:48ending right so initiatives are you will
  888. 37:51do some training and development
  889. 37:54programs right then talk about internal
  890. 37:57business process again let's say uh we
  891. 38:00are talking about fall F fall of
  892. 38:02rejection rate means process rejection
  893. 38:05process rejection means we are producing
  894. 38:08something during the process uh
  895. 38:10processing that we are breaking the
  896. 38:13components sometime we are doing the
  897. 38:15faulty operation and then the complaints
  898. 38:18are coming from the market so maybe the
  899. 38:20target is always less than 2% it should
  900. 38:23be means how many products you are
  901. 38:25producing defected products and how many
  902. 38:28total you have produced if you have
  903. 38:30produced total uh total 90 100 products
  904. 38:34out of those two products are defected
  905. 38:37right 98 are okay so that means fall of
  906. 38:39rejection rate is
  907. 38:412% right so now you see how we can
  908. 38:45measure this objectives we objective is
  909. 38:48to reduce this let's say this is a new
  910. 38:50model we just implemented the process we
  911. 38:53want to make it less than 10% right now
  912. 38:56because we are somewhere feeling me 12
  913. 38:58to 15% fall of rejection rate less than
  914. 39:0110% we need to maintain measures will be
  915. 39:03fall of rejection rate f is the measure
  916. 39:06Target is initially I will go for maybe
  917. 39:0910 to 11% then I'll go for 8 to 10% then
  918. 39:14I'll go for 5 to 7% see then I'm saying
  919. 39:18stage wise this improving this how this
  920. 39:20will improve either I need to make some
  921. 39:23investment in the process I need to
  922. 39:25change the process I need to train my
  923. 39:28Manpower I need to opt for some latest
  924. 39:31technology that means this involves cost
  925. 39:34so when you are taking those initiatives
  926. 39:37right either you are taking initiative
  927. 39:39to implement new technology that improve
  928. 39:42that includes some investment so you
  929. 39:44need to you know evaluate whether
  930. 39:47whatever investment you are doing
  931. 39:49whether that investment is really coming
  932. 39:52in terms of reducing the F or not okay
  933. 39:56Financial measure so again to succeed
  934. 39:58financially how our stakeholders should
  935. 40:01uh view us that how we are doing
  936. 40:04financially right so if you are talking
  937. 40:07about cost of production we want to
  938. 40:10reduce the cost of production this is
  939. 40:12the objective or maybe Logistics cost
  940. 40:15the last example we talked about is 14%
  941. 40:18in India how we can improve the cost
  942. 40:20maybe this objective is we'll make it
  943. 40:2310% and because our 70% share is is
  944. 40:27going through Road transportation and we
  945. 40:30have seen that road transportation is
  946. 40:33usually carries more cost more delay
  947. 40:36will happen accidents will happen and
  948. 40:39weather condition depending upon so many
  949. 40:41external factors so if you want to
  950. 40:45reduce that our first Target should be
  951. 40:47we need to reduce the road
  952. 40:49Transportation share we need to increase
  953. 40:51the ship Transportation share where the
  954. 40:55cost may be not more than 1.5 rupees per
  955. 40:58kilometer but if you are talking about
  956. 41:00your road Transportation the one maybe
  957. 41:03the cost for shipping through 1
  958. 41:05kilometer may be 4 to 5 rupees so how we
  959. 41:08can uh reduce that cost alternative ways
  960. 41:12of transportation initiatives you need
  961. 41:14to Shi shift from one mode of
  962. 41:17transportation to other mode of
  963. 41:18transportation what you will do with
  964. 41:20those resources which you deployed for
  965. 41:22Road transportation that also you need
  966. 41:24to think so when you are changing from
  967. 41:26one to other mode your many of the
  968. 41:29resources will go obsolete what you will
  969. 41:31do with those resources so this is you
  970. 41:34can see depending upon your vision and
  971. 41:36strategy what you want to be how you
  972. 41:39will be you are posing yourself your
  973. 41:41organization after 10 years 20 years in
  974. 41:44that industry different measures you can
  975. 41:46set right so this is complete balance
  976. 41:49scorecard approach quickly we'll go
  977. 41:52through already I have discussed this
  978. 41:54point if customer perspective is there
  979. 41:56customer is worried about cost time when
  980. 41:59he's getting the product quality of the
  981. 42:01product and services level if you are
  982. 42:02saying within one day delivery I'll
  983. 42:05definitely come to you if you are saying
  984. 42:07for medicine within half an hour
  985. 42:09delivery going to Medical store
  986. 42:11searching for the medicines maybe I'll
  987. 42:13get may not I'll get so then again you
  988. 42:16go to the next store if I'm getting 30
  989. 42:19minutes delivery this is fair enough
  990. 42:22right so this is customer how customer
  991. 42:24is experience your services customer
  992. 42:27experience can be enhanced so this is
  993. 42:29customer perspective there may be some
  994. 42:31other ways these are four major points
  995. 42:34right how uh responsibly you are
  996. 42:37responding to your queries after sales
  997. 42:39Services can also be very important
  998. 42:41right what type of variety you are
  999. 42:43offering what type level of innovation
  1000. 42:46you are offering that can be customer
  1001. 42:47perspective but this is how you can
  1002. 42:50figure out the dimensions related to
  1003. 42:52customer
  1004. 42:53perspective talking about your internal
  1005. 42:56process perspective like we talked about
  1006. 42:58we want to reduce the fall of rejection
  1007. 43:00rate right so how we can reduce that we
  1008. 43:03need to automate the process so if Pro
  1009. 43:06process automation is there obviously
  1010. 43:08there is no Manpower because that defect
  1011. 43:11why defect is happening because manp
  1012. 43:13power is doing the faulty operation
  1013. 43:15maybe today he joined or very new on
  1014. 43:17that operation so he's taking time to
  1015. 43:19learn maybe he is not familiar with the
  1016. 43:22equipment he doesn't know how to operate
  1017. 43:24properly how to set the parameters even
  1018. 43:26then that can happen so if you can
  1019. 43:29eliminate manp power even then then you
  1020. 43:32can reduce those defects but it's not
  1021. 43:35only elimination when we are talking
  1022. 43:36about the manufacturing we we can
  1023. 43:38include the you know training and
  1024. 43:40development
  1025. 43:41programs if those are the critical
  1026. 43:44stages where you know most of the
  1027. 43:45defects are occurring how we can design
  1028. 43:48how we can you know ensure that only
  1029. 43:51trained people are working on those
  1030. 43:52stages process bottlenecks how we can
  1031. 43:55remove the bottleneck in the production
  1032. 43:57so if maybe one again again and again
  1033. 44:01I'm taking example if this stage is
  1034. 44:03taking 5 Second this stage is taking 10
  1035. 44:06second that means there is
  1036. 44:08bottleneck he is producing two pieces at
  1037. 44:11that time and he's only able to process
  1038. 44:14one piece so bottleneck you are limited
  1039. 44:16by capacity because of the second stage
  1040. 44:19if you can
  1041. 44:20somewhere you know maintain the uh
  1042. 44:23uniformity throughout all the stages you
  1043. 44:26see maybe more than 500 stages are there
  1044. 44:28in the production line so you need to
  1045. 44:31design accordingly how you are aligning
  1046. 44:33your process and how you are defining
  1047. 44:35number of activities per person if one
  1048. 44:37person is moving from here to there uh
  1049. 44:40everywhere he is dancing on the floor
  1050. 44:42like that so that means most most of the
  1051. 44:45effort is going waste in that way right
  1052. 44:49talking about the learning and growth
  1053. 44:51perspective how we can you know ensure
  1054. 44:54that our see when we are talking about
  1055. 44:56learning learning and growth it's not
  1056. 44:58only the Manpower resources we are
  1057. 45:00talking about they should learn and grow
  1058. 45:01obviously they should learn they should
  1059. 45:03grow and if anyone is able to see the
  1060. 45:06career path in any organization
  1061. 45:08obviously he will be motivated to go to
  1062. 45:11the next level level one 2 3 4 5 already
  1063. 45:14you have defined and you have made sure
  1064. 45:16that even the person will you know work
  1065. 45:19in your organization for next 40 years
  1066. 45:21even then he will not feel like he is
  1067. 45:24saturated in his career if you can
  1068. 45:26desire that kind of career path for any
  1069. 45:29employee in the organization obviously
  1070. 45:31no will no one will leave because every
  1071. 45:34day you are getting new opportunities
  1072. 45:36new challenges your job is enriched your
  1073. 45:39job is enlarged in that way you are also
  1074. 45:42finding your passion but that is one
  1075. 45:44point when we are talking about
  1076. 45:46maintaining your manpa but what about
  1077. 45:50learning and growth when we are talking
  1078. 45:51about whether we are learning new
  1079. 45:53technology if our competitors are
  1080. 45:55implementing iot right industry 4.0 and
  1081. 45:59they are automating their warehouses and
  1082. 46:02we are still we we maybe 500 workers are
  1083. 46:06working in the warehouse and then they
  1084. 46:07are taking time where is that packet
  1085. 46:10where is that product then they are
  1086. 46:12picking manually they are pack doing the
  1087. 46:14packaging then they are doing the
  1088. 46:16kitting manually then it is sent and
  1089. 46:18sometimes because when you are putting
  1090. 46:20the level or maybe the billing invoice
  1091. 46:22manually you can do it wrong because
  1092. 46:25daily maybe you are processing more than
  1093. 46:2710,000 products so that is quite
  1094. 46:30possible right so how you are growing
  1095. 46:32technologically how you are sustaining
  1096. 46:35is the right word how your organization
  1097. 46:38is sustaining how Industries are doing
  1098. 46:40today after 10 years the scenario will
  1099. 46:43totally change right so how quickly your
  1100. 46:47uh resources are opting for that right
  1101. 46:50Financial perspective cash flow how you
  1102. 46:53are managing C liquidity ratio if you
  1103. 46:56are keeping you know all the time very
  1104. 46:58high inventory that means your cash is
  1105. 47:01involved in inventory only right and why
  1106. 47:04inventory is there because you are not
  1107. 47:06connected fully with the customer and
  1108. 47:08you are not able to configure the demand
  1109. 47:11return on investment if you are going
  1110. 47:13for implementing iot you invested 10%
  1111. 47:16but you see that only return is 2% what
  1112. 47:20is the fund of implementing
  1113. 47:22iot right so that also you need to
  1114. 47:25ensure whether you are getting those
  1115. 47:28returns or not or wherever Financial
  1116. 47:30results either month-wise week wise you
  1117. 47:33are you know observing or sometime
  1118. 47:36measures are like that long-term
  1119. 47:37investment is there so maybe it will
  1120. 47:39take two years five years down the line
  1121. 47:42when Zoo initially started investing
  1122. 47:45into the market and they said that all
  1123. 47:46services are free that means that was
  1124. 47:49their investment for first year they
  1125. 47:51were not looking at all for any single
  1126. 47:53rupee of profit and then then once we
  1127. 47:57will be well established capture at
  1128. 47:59least 60% share in the market then we'll
  1129. 48:02come with our pricing policy right so
  1130. 48:05that is one scenario how these four
  1131. 48:09perspective are
  1132. 48:10linked see how do customer CS
  1133. 48:14financially if you are buying your
  1134. 48:16product see whenever you you start
  1135. 48:20buying the product any home appliances
  1136. 48:22so let's say if you are buying TV so
  1137. 48:25first thing maybe for middle class or
  1138. 48:27somewhere upper middle class usually you
  1139. 48:30talk about Sony is known best in the TV
  1140. 48:33maybe right if you talk talk about the
  1141. 48:37sound quality system Sony may be the
  1142. 48:39leader if we talking about AC Hitachi
  1143. 48:42lawyer these are maybe the leader so
  1144. 48:44that means financially if you are you
  1145. 48:47are buying that brand that brand is
  1146. 48:49existing everywhere right like best
  1147. 48:51example is Uber anywhere you go most of
  1148. 48:54the countries Uber eat is there Uber
  1149. 48:57Eats and then Uber Services you can get
  1150. 49:00so that means wherever you are you are
  1151. 49:02feeling comfortable that your service
  1152. 49:04provider is there only right so you are
  1153. 49:07not worried about if any returns are
  1154. 49:09happening you are not worried about if
  1155. 49:11you'll miss any you know uh ride or
  1156. 49:14something like that if you cancel any
  1157. 49:15ride if you if I'll visit some other
  1158. 49:18country and if I'm installing app
  1159. 49:20temporarily and then using that app I
  1160. 49:23never know whether I'll get my money
  1161. 49:25back or not and whether that app is
  1162. 49:27reliable or not right so that means then
  1163. 49:31customer and learning growth how are how
  1164. 49:34we doing are we doing the best for
  1165. 49:36stakeholders how our stakeholders are
  1166. 49:38when you are saying that that this year
  1167. 49:41we earned 10% profit and then you are
  1168. 49:43saying that 5% will'll do it at dividend
  1169. 49:46and rest 5% we'll invest further for
  1170. 49:49further Improvement maybe in technology
  1171. 49:52maybe developing some resources maybe
  1172. 49:54expanding or anything any other business
  1173. 49:58that means whether your stakeholders are
  1174. 50:00looking in that way or they want all the
  1175. 50:0210% right now where we can create value
  1176. 50:05for the customer through business
  1177. 50:07processes and whatever we are doing how
  1178. 50:09we can excel in those processes we can
  1179. 50:12be the best in that so this is best
  1180. 50:14example of balance scorecard right so
  1181. 50:18you can just take any example if we want
  1182. 50:20to improve the productivity Financial
  1183. 50:23perspective means input is still this
  1184. 50:27level output you are producing this much
  1185. 50:30right earlier maybe the situation was
  1186. 50:33this this much input and this much
  1187. 50:35output you were getting right at this
  1188. 50:38level now either you can do this or for
  1189. 50:42the same input maybe you can red you can
  1190. 50:45increase the output or maybe you can
  1191. 50:48reduce the input and still you are
  1192. 50:51maintaining the same level of
  1193. 50:53output so how you can do that capacity
  1194. 50:56utilization is one point how much
  1195. 50:59percentage of capacity you are utilizing
  1196. 51:01trial production spare part production
  1197. 51:03how you are doing that so then you can
  1198. 51:06monitor weekly monthly you can monitor
  1199. 51:08like the best example I quoted today is
  1200. 51:11that when for these two and two and a
  1201. 51:14half months whenever all the lecture
  1202. 51:16theaters are empty and those facilities
  1203. 51:19project highend you know infrastructure
  1204. 51:22we have developed here so that is lying
  1205. 51:25you know idle we are not utilizing those
  1206. 51:27resources can we run some training
  1207. 51:29programs for some Industries during that
  1208. 51:32time will not only generate the revenue
  1209. 51:35we are also extending our H hands
  1210. 51:38Helping Hands to the industries where we
  1211. 51:40can train our industry people also our
  1212. 51:43industry is very you know big
  1213. 51:45stakeholder for any educational
  1214. 51:46institution only then those people will
  1215. 51:48return back and will ensure the
  1216. 51:50placements also they will also ensure
  1217. 51:53the training they will invite the
  1218. 51:54students from our campus for the
  1219. 51:56training purpose so this is how you can
  1220. 51:58what you are doing you are not investing
  1221. 52:01a single rupee extra to develop those
  1222. 52:03resources already those resources are
  1223. 52:05there and for two and a half months we
  1224. 52:07are not using and same is happening
  1225. 52:09during December month also when there is
  1226. 52:12winter break right so this is one way
  1227. 52:16other also you can I have already taken
  1228. 52:18the example you can think of any you
  1229. 52:20know continuous Improvement we are
  1230. 52:21talking about you can Implement Kaizen
  1231. 52:23you can Implement Six Sigma you can
  1232. 52:25Implement lean man manfacturing right so
  1233. 52:27continuous Improvement how you can
  1234. 52:29improve and those you can uh monitor uh
  1235. 52:33maybe uh daily also you can monitor
  1236. 52:37weekly also one very good example is
  1237. 52:39striking in my mind when I was working
  1238. 52:42uh with the uh every India limited so
  1239. 52:45they they were trying to get ISO
  1240. 52:48certification for uh uh 14,1 also they
  1241. 52:51were trying and 9,1 they were trying for
  1242. 52:54quality and they were trying for
  1243. 52:56environment so what they did before
  1244. 52:58going for certification they conducted
  1245. 53:01some training Pro program for uh uh for
  1246. 53:04internal you know uh employees so they
  1247. 53:08picked one person from quality I was
  1248. 53:10picked from quality from one person from
  1249. 53:11production one person from store and all
  1250. 53:15those people were involved and they
  1251. 53:16trained us for maybe 10 days and then
  1252. 53:18they uh you know we uh we attended one
  1253. 53:22exam also and then we were you know ISO
  1254. 53:24certified auditor so that means before
  1255. 53:27going for external certification we have
  1256. 53:30internal Auditors who can maintain the
  1257. 53:32records for maybe next 6 months or one
  1258. 53:34year and then we will see that now we
  1259. 53:36are ready to apply for this and when
  1260. 53:39those people will come because we have
  1261. 53:41already you know auditor team who have
  1262. 53:43done this exercise meticulously that
  1263. 53:46means obviously we'll get that
  1264. 53:47certification this is one way how you
  1265. 53:49can align your strategy so what are the
  1266. 53:53benefits you can align your performance
  1267. 53:56measures your strategy at all levels of
  1268. 53:58the organization all the stakeholders
  1269. 54:01best way of communication single thread
  1270. 54:04attaching all the stakeholders and
  1271. 54:07obviously you are talking about the best
  1272. 54:08practices where you are right now what
  1273. 54:10are the Benchmark in that in terms of
  1274. 54:12kpis then organization mission statement
  1275. 54:16and strategic plan you are attaching
  1276. 54:18with all the four perspective and that
  1277. 54:20is not only you are aligning that is
  1278. 54:22coming as order that now you need to
  1279. 54:25improve we need to implement ISO 901 so
  1280. 54:29that means we need to get that
  1281. 54:31certification how we can do that there
  1282. 54:33must be some employees internally who
  1283. 54:36are regularly doing all the checks and
  1284. 54:38then one day they will say maybe after
  1285. 54:40one year that now we are ready with our
  1286. 54:42records now we have implemented all the
  1287. 54:45manual whatever is required for getting
  1288. 54:48ISO 9001 14,001 so then we can go for uh
  1289. 54:53imple uh for getting that certification
  1290. 54:55right so you can see almost 60% of
  1291. 54:59Fortune 500 companies are using balance
  1292. 55:01scorecard
  1293. 55:03right so some uh obviously criticisms
  1294. 55:06are also there lack of well- defined
  1295. 55:08strategy the basic Assumption of score
  1296. 55:10balance scorecard is you should have one
  1297. 55:13strategy which is the heart of this
  1298. 55:15complete framework right so always
  1299. 55:18because strategy is something you are
  1300. 55:21judging the environment you are
  1301. 55:23analyzing the environment and then you
  1302. 55:24are developing so that means envir
  1303. 55:26enironment is changing your strategy
  1304. 55:28will keep on changing so how you will
  1305. 55:30align that too much focus on lagging
  1306. 55:32measures always you are talking about
  1307. 55:34where you are lagging how you can
  1308. 55:36improve but we are maybe during that
  1309. 55:39time we may miss the opportunity with
  1310. 55:41our strengths already we are very good
  1311. 55:44with our strengths but we are too much
  1312. 55:46focused on lagging measures so that way
  1313. 55:48maybe we'll miss that and we are using
  1314. 55:51some generic Matrix because if your
  1315. 55:53player industry player is using maybe
  1316. 55:56same competitor still you can get some
  1317. 55:59some of the kpis but all kpis may not be
  1318. 56:03applicable for all the players right if
  1319. 56:06you are somewhere producing 15% F your
  1320. 56:10uh the player who is working in that
  1321. 56:11industry maybe somewhere ensuring 5% F
  1322. 56:15how you can compare directly with 5% so
  1323. 56:18you need to set you know those levels
  1324. 56:21right and sometimes maybe managers were
  1325. 56:24getting those Awards they are you know
  1326. 56:27manipulating these things so that
  1327. 56:29short-term performance can be managed
  1328. 56:31and then they can get those reward this
  1329. 56:33is one case where you can see Southwest
  1330. 56:36Airlines they used number of balance
  1331. 56:39scorecard but what I'm talking about
  1332. 56:41here is they use that score balance
  1333. 56:44scorecard for uh recording the ground
  1334. 56:47crew performance and they they wanted to
  1335. 56:49lower down the cost and they how they
  1336. 56:52can load on the cost if they can ensure
  1337. 56:55the fast ground turn around how quickly
  1338. 56:58you can do that indigo is another very
  1339. 57:01best example where the major of the you
  1340. 57:04know industry players per plane they are
  1341. 57:06maintaining 180 employes to 200 employes
  1342. 57:09indigo is managing with 90 to 100
  1343. 57:11employes ground stuff I'm talking about
  1344. 57:14how quickly they are doing the you know
  1345. 57:16ground turnaround and how they can save
  1346. 57:19this because you need to implement that
  1347. 57:22system so first you need to know where
  1348. 57:24you are as for those parameters maybe
  1349. 57:27you need to train your ground staff
  1350. 57:29right and if you are talking about
  1351. 57:31always the financial measure maybe the
  1352. 57:33people who are working with the finance
  1353. 57:34department accounting department it will
  1354. 57:36make more sense but what about those
  1355. 57:39people who are working with R&D today
  1356. 57:41they are coming up with model maybe
  1357. 57:43tomorrow they may not be able to
  1358. 57:44commercialize that what will happen with
  1359. 57:46that prototype so it's not that it
  1360. 57:49should be discouraging that you are not
  1361. 57:50adding any value maybe after 10 years
  1362. 57:54they are coming with some unique unique
  1363. 57:56product unique technology can you know
  1364. 57:59leverage for next 20 years right but
  1365. 58:02directly connecting them with the
  1366. 58:03financial measures is not possible for
  1367. 58:06same goes with the manufacturing also
  1368. 58:08whatever you are manufacturing you never
  1369. 58:10you cannot relate means quickly you need
  1370. 58:13that sometimes you need to make multiple
  1371. 58:15changeovers if all the time I'm thinking
  1372. 58:17about the cost maybe I may not be able
  1373. 58:20to provide the variety right so because
  1374. 58:22variety will take time to change over so
  1375. 58:25then so that means it will not make
  1376. 58:28sense for the for the person who is
  1377. 58:30working in the manufacturing department
  1378. 58:32so that means if you want to improve
  1379. 58:35overall you need to improve the
  1380. 58:37perspective from all the Departments not
  1381. 58:40only financial measures non Financial
  1382. 58:42measures should also be there and we can
  1383. 58:44come up with One dashboard where the top
  1384. 58:47management can only just those
  1385. 58:48parameters and can say this department
  1386. 58:51is doing Fair good or we are lagging
  1387. 58:53with some points right so that they can
  1388. 58:56work on right so obviously we are
  1389. 58:59working to satisfy the customer needs in
  1390. 59:01a more profitable way customer
  1391. 59:03experience should be enhanced but then
  1392. 59:06we need to measure both the financial as
  1393. 59:09well as non-financial measures we should
  1394. 59:11not forget the services uh offered by
  1395. 59:15different functional units like
  1396. 59:18Administration Services distribution
  1397. 59:19services maintenance services
  1398. 59:21maintenance what maintenance department
  1399. 59:23is doing just maintaining the equipment
  1400. 59:26cannot you cannot relate how much profit
  1401. 59:28we are getting out of that but you just
  1402. 59:30imagine if our main machine is down for
  1403. 59:3330 minutes everything is gone your
  1404. 59:36production is gone that those machines
  1405. 59:38are working thanks to the fin uh your
  1406. 59:41maintenance team because they are
  1407. 59:42maintaining it properly so this we have
  1408. 59:46seen how we can you know include all the
  1409. 59:49different stakeholders using the balance
  1410. 59:51scorecard approach so in the next
  1411. 59:53session we'll continue this discussion
  1412. 59:55and we'll try to develop the balance
  1413. 59:57scorecard specifically for the supply
  1414. 59:59chain uh industry right so these are
  1415. 1:00:02some of the references we'll continue
  1416. 1:00:03this discussion in the next session
  1417. 1:00:05thank you very much

About this transcript

This page contains the full transcript of Lecture 40 : Supply Chain Performance: Balanced Scorecard Approach by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 9,521 words across 1,417 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.