- 0:26hello dear friends welcome to nptl
- 0:28course on Logistics and supply
- 0:30management so in the last few session we
- 0:32discussed about strategic sourcing and
- 0:35then we discussed how we can you know
- 0:38finalize different criteria so that we
- 0:40can uh pick our strategic uh Partners
- 0:43right so uh these strategic Partners can
- 0:47be down the supply chain means forward
- 0:50supply chain or can be uh the in the
- 0:53backward supply chain right so anything
- 0:55if you are you know Outsourcing so that
- 0:58means you are picking your external
- 1:00strategic Partners right so here we'll
- 1:03talk about specifically vendor rating
- 1:06which is very very important and my uh
- 1:09personal experience in that is that when
- 1:13we talk about you know sourcing from
- 1:15different suppliers so this is this
- 1:17becomes very very important to you know
- 1:20continuously monitor their performance
- 1:22against some predefined set of criteria
- 1:25right so that if there is any lack we
- 1:28can improve that with the the passage of
- 1:30time and we can provide most importantly
- 1:33the positive feedback to our suppliers
- 1:35because eliminating suppliers based on
- 1:38any criteria like your price quality
- 1:41delivery or anything Services they are
- 1:44providing is not going to work for any
- 1:47manufacturer any organization who is
- 1:49providing product and services right so
- 1:52uh such beautiful concept of vendor
- 1:55rating and topic so we'll cover uh what
- 1:58are the different criteria when we talk
- 2:00about vendor rating why this is required
- 2:03we'll talk about some steps of vendor
- 2:05rating some techniques right and uh uh
- 2:09I'll specifically quote you one uh very
- 2:12practical example how we are using
- 2:13vendor rating format in the industries
- 2:16where we are evaluating our stakeholders
- 2:19right uh who are providing different
- 2:21types of material to your organization
- 2:24right and uh we'll talk about uh one
- 2:27case study in that and then we'll uh
- 2:29conclude clude uh this session on vendor
- 2:31rating so vendor rating is a formal
- 2:35evaluation system of all the vendors or
- 2:38suppliers who are providing you uh
- 2:40different components right so talking
- 2:43about formal evalu now we this is fixed
- 2:46that now we have fixed our external
- 2:48Partners we have picked our external
- 2:50Partners now we are talking about the
- 2:52routine repititive purchasing decisions
- 2:56right so then we are talking about
- 2:58repetitive purchasing decision obviously
- 3:00for particular component we have we
- 3:03might have fixed maybe four five six
- 3:05suppliers depending upon the you know so
- 3:07many different parameters right whether
- 3:09you want uh few suppliers you want many
- 3:12suppliers you you want to stick with
- 3:14only one supplier so that depends upon
- 3:16the situation depend upon the industry
- 3:18scenario your product uh what you are
- 3:21dealing with or Services right so
- 3:23basically when we are talking about
- 3:25evaluating vendor rating so major point
- 3:28that come uh uh in our mind is related
- 3:32to obviously the price is very very
- 3:34important then quality whatever material
- 3:36they are supplying and then delivery
- 3:38schedule right and services means any
- 3:41queries relate uh related to the
- 3:44material they are providing or any
- 3:46complaints are coming how they are
- 3:48handling or any kind of services how
- 3:50promptly they are responding to the
- 3:53queries of the manufacturing unit right
- 3:56so these are few uh uh important set of
- 4:00criteria which you continuously evolve
- 4:02but these are not only the set of
- 4:04criteria right let's talk about you you
- 4:06sometimes you may consider the
- 4:08industrial relation of the vendor
- 4:09sometime you may you may consider the
- 4:11financial position of the vendor you may
- 4:14consider how uh uh they are innovating
- 4:17or renovating their products designing
- 4:20different features right whatever
- 4:22components they are supplying to you
- 4:24right so these These are broad scenario
- 4:27right you depending upon whatever your
- 4:29requirement you can keep evaluating your
- 4:31vendor right so the basic purpose is to
- 4:35assign a rating rating or score to each
- 4:38vendor now when we'll evaluate 1 2 3 4
- 4:41five vendors so that means we are
- 4:43prioritizing based on whatever
- 4:45predetermined set of criteria is there
- 4:47right so this will help you to make the
- 4:50informed decisions when you will go for
- 4:53allocating the orders to different
- 4:55vendors so that let's say why vendor
- 4:58rating we are doing the B basic purpose
- 5:00is so that when we will you know go for
- 5:04allocating the orders to all those
- 5:06vendors the maximum order should go to
- 5:08that vendor which is more strategic
- 5:11giving us more strategic options that
- 5:13means who is having the highest rating
- 5:16right so we should we should uh allocate
- 5:19the maximum order to that vendor okay so
- 5:22obviously when you are monitoring and
- 5:24assessing the vendor performance the one
- 5:27point is feedback to the supplier which
- 5:29will help them to continuously
- 5:31continuously improve or Benchmark their
- 5:34practices with the best available
- 5:36practices in the industry right so this
- 5:39will also minimize the subjectivity in
- 5:41judgment subjectivity means then you you
- 5:45in that way will take more informed
- 5:47decision that to whom you should pick as
- 5:50the first priority maybe on quality
- 5:52maybe on price maybe whatever or if you
- 5:55are going with some let's say uh from
- 5:58Model A now now you are uh offering
- 6:01model B in the market with some other
- 6:03features right so which are those
- 6:06vendors from all those five vendors you
- 6:08will pick three vendors which are those
- 6:10vendors which will provide you material
- 6:13for your model B right so obviously you
- 6:17will pick those vendors you are
- 6:18performing uh fair enough on that uh on
- 6:22those parameters right so typically we
- 6:24are calculating different formula
- 6:26techniques mathematically techniques we
- 6:28have to find out the weighted score
- 6:31against each vendor and then we'll say
- 6:33that this is how we can prioritize that
- 6:36right so uh this this is important
- 6:39because it will ensure you the effective
- 6:41purchasing and procurement right uh and
- 6:45when you are dealing with those kind of
- 6:47Industries uh like where you are you
- 6:49know heavily purchasing items in terms
- 6:51of volume number quantity in terms of
- 6:54the value of the product maybe quantity
- 6:56is not that high but the price is very
- 6:59very high or maybe you are talking about
- 7:01those sensitive products on which uh or
- 7:04components raw material on which the
- 7:06complete functionality or safety related
- 7:09parameters are associated of your
- 7:11product right so in that way you need to
- 7:13evaluate the vendor usually we are uh
- 7:17evaluating uh your uh vendors on price
- 7:21quality what are the price they are
- 7:22offering what are the quality they are
- 7:24offering Services level and delivery but
- 7:27we'll discuss about different scenario
- 7:29uh uh how and where these different set
- 7:32of criteria are important so I just give
- 7:36you one very you know uh uh basic
- 7:39example let's say uh we are
- 7:41manufacturing any any home appliances or
- 7:44automobile industry we are using this
- 7:46component of screw right so this screw
- 7:48we are using and coming from our let's
- 7:52say uh let's say four different vendors
- 7:57now obviously this is very small
- 7:59component if you are talking about any
- 8:01industry your are home appliances the
- 8:03value maybe if you are using 10 screw
- 8:05maybe more than that also in one product
- 8:08so value may not be more than 10 Rupees
- 8:1015 rupees or somewhere like that okay
- 8:12that depends upon the know uh the uh
- 8:16again the specification of the screw so
- 8:19whenever you are receiving the lot
- 8:22obviously what is the first step the raw
- 8:24material is coming and we have discussed
- 8:27that firstly it is going to within that
- 8:29manufacturing organization it is going
- 8:31to iqc please you need to keep this
- 8:34basic structure in your mind so that
- 8:36through this session whatever I will
- 8:39refer you can just relate with how it is
- 8:41happening in the real world so iqc what
- 8:43iqc will do iqc based on certain
- 8:46sampling maybe 10,000 lot you received
- 8:50maybe they will pick 250 units right and
- 8:53then they will check those units whether
- 8:56that lot is okay or not okay now how you
- 9:00will Define that lot is okay or not okay
- 9:02obviously you might have defined some
- 9:04Dimension that length of the screw
- 9:06should be this
- 9:08much plus minus tolerance you will say
- 9:11right then Dia of this should be this
- 9:14much again another dimension Dia of the
- 9:17thread should be this much right another
- 9:19dimension so this Dimension one
- 9:21dimension two Dimension three right
- 9:24these are some of the few Dimensions
- 9:26which are very very important when we
- 9:28will talk about a very small component
- 9:30screw right now you check 250 material
- 9:34and this is not only this is the
- 9:36quantitative method you checked right
- 9:38you recorded various quantitative
- 9:40parameters Dimension 1 2 3 4 5 then some
- 9:44qualitative measures will be there let's
- 9:46say qualitative measures uh if extra
- 9:49material is there on that thread that
- 9:52means that you can check because this
- 9:54maybe within this this Dimension is
- 9:57within limit but still because extra
- 10:00extra kind of uh material is there maybe
- 10:04during L operation so that because of be
- 10:07and tier of the tool or because of Any
- 10:09technical reason right so some extra
- 10:11material is coming that means this will
- 10:13destroy the hole where you are going to
- 10:15put this screw right so aesthetically
- 10:19you will check that extra material is
- 10:20coming on that if shape of that screw is
- 10:23somewhere may be deviated so qualitative
- 10:25you are checking uh some parameter
- 10:28visual parameters we can say right let's
- 10:31say some visual parameter you can check
- 10:33for color for kind of this defect then
- 10:37you can check for maybe flavor depending
- 10:41if that is important for that industry
- 10:43these are some of the qualitative
- 10:45parameters right shape also you can
- 10:48observe you know uh visually you can
- 10:51observe so whenever we are making the
- 10:54vendor rating we have one parameter
- 10:56quantitative parameters we are
- 10:58evaluating and then qualitative
- 10:59parameter now depending upon this
- 11:02sampling you checked both the
- 11:04qualitative as well as quantitative
- 11:05parameters whatever you have set for
- 11:07that particular component and see this
- 11:10these if in one industry I'm talking
- 11:12about this vendor rating format will be
- 11:15different for all the uh suppliers but
- 11:20if four suppliers are supplying the same
- 11:22component then vendor rating format for
- 11:25all those four suppliers will be same if
- 11:28it this lot is okay let's say if lot is
- 11:32okay so what will happen you will go you
- 11:34will store this in the store Department
- 11:37from where it will go to the production
- 11:40floor and production
- 11:42floor again the production will happen
- 11:44and finished good will be delivered this
- 11:46is how it will happen right not okay if
- 11:49loot is not okay what will happen it
- 11:51will be supplied back to
- 11:54the vendor right so that means these two
- 11:58decision but third decision is also
- 12:00there if it is not okay and maybe you
- 12:04are in urgency of that material you
- 12:07cannot simply reject and send back to
- 12:09the vendor so what you will pick the
- 12:11option at that time maybe you will
- 12:13segregate at your own end right and
- 12:17whatever okay is there you will move
- 12:20maybe to the store and whatever is
- 12:23rejected maybe you will move back to the
- 12:26uh sorry not iy to the raw material
- 12:29supplier right so that means third
- 12:32option is segregation now you see where
- 12:34this vendor is connected first this
- 12:37vendor is going to get all the
- 12:40information feedback from iqc right so
- 12:43any lot is rejected at IC end means will
- 12:46be whole lot is rejected based on
- 12:49sampling will be sent back to the raw
- 12:50material supplier again they will
- 12:52process it then again cost will be there
- 12:55but if it is uh in between that some
- 12:58rejection is there but you can segregate
- 13:00and still run uh the production line
- 13:03because if you'll return back the lot
- 13:05maybe your whole production line will
- 13:07stop so what you will think you you will
- 13:09take the decision let us segregate so
- 13:11segregation cost maybe 5 to 10 people
- 13:14are working for segregation that debit
- 13:17note you will raise through your
- 13:19accounts Department to that vendor
- 13:22because it is the responsibility of the
- 13:24raw material supplier because they are
- 13:26supposed to supply the okay raw material
- 13:30right so that cost of segregation will
- 13:32be there by your vendor production line
- 13:37then you start producing the you
- 13:39accepted the lot and you start producing
- 13:41the product but somewhere you see after
- 13:44using all every every time you are using
- 13:48500 screws somewhere around 10 to 15
- 13:51screws you are getting sometimes this
- 13:53cap is not there sometime threads are
- 13:55not there and you could not catch that
- 13:57in your sampling sometimes uh this shape
- 14:00is maybe uh uh deviated right so during
- 14:05that you are now producing the process
- 14:08this uh Zero Hour rejection that means
- 14:11you did not process that material and it
- 14:14is before putting that skew you just
- 14:17your that person who was working on that
- 14:20stage he just found that this screw is
- 14:23not okay right so based on that this is
- 14:27rejected so this is zero hour rejection
- 14:29whatever in the end you will use that
- 14:31lot let's say if 500 pieces are rejected
- 14:34these are will be sent back to the raw
- 14:37material supplier and against that lot
- 14:40will be that debit note will be raised
- 14:42against that raw material supplier so
- 14:45this complete picture you keep in mind
- 14:47so that we can just quickly refer about
- 14:50that right so Factor considered in
- 14:53Bender rating quality is first now
- 14:56quality is you need to meet all the
- 14:59specification like specification now you
- 15:01just keep that example in mind your
- 15:03screw diameter thread diameter cap
- 15:06diameter screw length these are the
- 15:08specif then then some visual inspection
- 15:11you are doing right so that you need to
- 15:14stick to those Dimensions that means you
- 15:16are meeting the quality so that rework
- 15:19or repair the segregation we did right
- 15:22that is under rework or repair right so
- 15:25that should not happen price the
- 15:27competitive pricing what if you are
- 15:30buying from four different vendors all
- 15:32are providing different rates right now
- 15:34you will keep the lowest price vendor
- 15:37also and highest price vendor also
- 15:39because we cannot eliminate the vendors
- 15:42we need to develop the vendors where
- 15:44they can be more efficient quality can
- 15:46be improved right so that this is one
- 15:49system if the our vendors will improve
- 15:52our total productivity will
- 15:54automatically improve right so factors
- 15:57like we'll observe price stability
- 15:59accurac means whether the prices are
- 16:02fluctuating from that particular vendor
- 16:04or they are providing the stable pricing
- 16:06strategy accuracy in Billing or if they
- 16:09are changing the price any prior notice
- 16:11they are giving us so these kind of
- 16:13things you are you know just recording
- 16:15with that particular vendor delivery now
- 16:18we have four vendors out of those four
- 16:20one is always struggling with the
- 16:22delivery one person is dedicated calling
- 16:25him again and again where is the lot and
- 16:27then we are waiting and that deviation
- 16:30if he is saying within 5 days it will be
- 16:32delivered always it is plus minus 3 days
- 16:34right so that means H variability is
- 16:37there in that way so that will you know
- 16:40Force you if that variability is there
- 16:42lead time is high will force you to keep
- 16:44extra inventory at your manufacturing
- 16:47unit so that is extra cost right so this
- 16:51delivery issues are also very important
- 16:53Services then how I talked about that uh
- 16:57uh the services what kind of Serv if we
- 16:59are raising as manufacturer you are
- 17:01raising some complaints how quickly and
- 17:04effectively they are resolving that
- 17:06complaints right and then sending you
- 17:08back that we have did we have done this
- 17:10uh uh correction and then we are again
- 17:13supplying you the material this is kind
- 17:15of services right so uh we'll see under
- 17:19each point what can be included I'll uh
- 17:23show you one vendor rating format there
- 17:25we'll see reliability now vendor is like
- 17:28I talk about one vendor may be uh
- 17:31struggling with the uh uh delivery right
- 17:34but he is very good with the quality so
- 17:37then you cannot eliminate that maybe one
- 17:40vendor is struggling with maintaining
- 17:42that quality but you see that vendor may
- 17:44be very very efficient he is producing
- 17:46for so many other uh industry players so
- 17:50that's why maybe because of frequently
- 17:52transition and change over is happening
- 17:55so quality somewhere is compromised but
- 17:57the he's giving giving you 5 to 10%
- 18:00lesser price than other vendors even
- 18:03then you cannot eliminate that obviously
- 18:05you will try to you know improve his
- 18:08quality as well but yes you cannot so
- 18:11few vendors are striking on some few
- 18:13parameters and the others are striking
- 18:16on some other parameter that's why this
- 18:18complete basket is required where you
- 18:20are not relying only on one Bender
- 18:22Innovation how vendor your vendor is
- 18:25ready for you know uh uh based on your
- 18:29whatever feedback you are providing how
- 18:32proly he is or proactively he is able to
- 18:35accept that feedback and ready to make
- 18:38those technical improvements right where
- 18:41maybe if you will change the outdated
- 18:44technology then maybe the productivity
- 18:46will improve productivity will improve
- 18:47the price will get down the quality will
- 18:50improve right so how quickly your vendor
- 18:52is ready to uh innovate and provide you
- 18:55the unique and differentiated product
- 18:58right so
- 19:00relationship relationship means the
- 19:03effective communication transparency
- 19:05collaboration you are maintaining with
- 19:07your vendors right so that will only
- 19:10happen when you are saying clearly
- 19:12providing your vendors the feedback and
- 19:15giving them the Improvement measures
- 19:17where they can improve I during my
- 19:20industry experience I have experienced
- 19:22this thing that you know whenever any
- 19:25manufacturer is you know coming up with
- 19:27new product or service Services many
- 19:29times this happens that you know when
- 19:32you start purchasing the raw material to
- 19:34you know make the finished good so then
- 19:38the very important feedback comes from
- 19:41the vendor side if we will replace maybe
- 19:43the design of that component maybe the
- 19:46material of that component grading of
- 19:48that component so then the overall
- 19:50quality performance durability will
- 19:53increase of that particular product
- 19:55whatever you are manufacturing so that
- 19:57will only happen when you are
- 19:58maintaining the transparent relationship
- 20:01communication is there so need for
- 20:04vendor rating obviously we need to
- 20:06evaluate the performance so that we can
- 20:09make the informed decision based on
- 20:11delivery price quality and services and
- 20:14then we can place the order it is not in
- 20:16the hand of only purchase Department
- 20:18that purchase department is raising the
- 20:20PO and maybe somewhere they are
- 20:22compromising with the quality or
- 20:23whatever subjectivity is there they want
- 20:25to favor some vendor that should not
- 20:28happen so it should be very very
- 20:30objective right quantitatively you are
- 20:32recording all the parameters and then
- 20:34you are saying that this vendor should
- 20:36go the 70% order the rest of the vendor
- 20:39should go 30% order right so this will
- 20:42also evaluation will also help you to
- 20:44identify their strengths and weaknesses
- 20:46right because over the time if you are
- 20:49coming with one model it will not last
- 20:52for more than four five or 10 years
- 20:54depending upon whatever product is right
- 20:56the nature of the industry because in
- 20:58that that way we have seen in some
- 21:00sessions we discussed the technological
- 21:03advancement is making the product life
- 21:05very shorter so then product life is
- 21:07shorter that
- 21:09means so continuously and repetitively
- 21:12you are changing the product design how
- 21:14you will change the product design with
- 21:16the collaboration of the suppliers only
- 21:19so supplyer development is the
- 21:20responsibility of the manufacturing unit
- 21:23who is buying product raw material from
- 21:25the supplier it's not only simply you
- 21:27reject or accept the lot so you need to
- 21:31uh train them you need to share the best
- 21:34practices let's say uh as a
- 21:36manufacturing unit you are big unit so
- 21:39you may be implementing some B uh for uh
- 21:43Inventory management you are
- 21:44implementing Inventory management
- 21:45software right or warehousing management
- 21:48software WMS you are using right or you
- 21:51are implementing Erp system how you can
- 21:54implement the same technology at your
- 21:56supplier end so that that efficiency
- 21:59which you are achieving by implementing
- 22:00that software that particular vendor can
- 22:03achieve so if he is efficient obviously
- 22:06then you can negotiate the price right
- 22:08risk mitigation this will only happen
- 22:11when you know that this vendor is always
- 22:13struggling with the let's say with the
- 22:15delivery so plus minus 3 days he is
- 22:18taking so I need to mitigate this risk
- 22:21so I need to maintain that Safety stock
- 22:24as per that how I can take the proactive
- 22:27measures even vendor is struggling with
- 22:30maintaining the quality how I can you
- 22:32know find the alternatives to meet that
- 22:35right cost optimization like if you are
- 22:38implementing Inventory management system
- 22:40at your vendor end right so that overall
- 22:43cost can be of maintaining that
- 22:45inventory can be minimized so that means
- 22:48that cost will lead to the increase in
- 22:51the margin of the overall supply chain
- 22:54right overall supply chain is complete
- 22:56one concept we have discussed of system
- 22:58system concept right and reducing rework
- 23:02that segregation should not happen right
- 23:05performance Benchmark now because uh we
- 23:09are evaluating with respect to some
- 23:11criteria and those criteria we are
- 23:13always updating those criteria so in
- 23:16that way we can Benchmark those criteria
- 23:19and uh we can just tell our uh vendors
- 23:23that where they are lagging right and we
- 23:26can uh uh we can help them to you know
- 23:29Define the path for the continuous
- 23:31Improvement supplier relationship
- 23:33management by evaluating the vendors and
- 23:36providing continuous feedback
- 23:38transparent communication and then they
- 23:41are they know that where they are
- 23:42standing right so that will help if you
- 23:45are transparent with your vendors you
- 23:47know that this this we we are deciding
- 23:50this very objectively so there your
- 23:52vendor also know that this is
- 23:54objectively done right let's say Ola Ola
- 23:57is now what what is Ola is doing they
- 23:59are the you know very big player while
- 24:02providing the taxi services but whether
- 24:05they own any taxi no they are not owning
- 24:07so their main stakeholders are the local
- 24:10taxi uh Union or owners or drivers who
- 24:14are you know operating or providing the
- 24:16taxi services right so now this is very
- 24:20transparent with the driver how you will
- 24:23behave with the you know whosoever is
- 24:25taking your services your customers how
- 24:28uh you are making them comfortable you
- 24:31are maintaining the cleaniness in the
- 24:32vehicle how you are taking the optimized
- 24:34route how you are following the
- 24:36predefined route whatever is shown in
- 24:38there how you are charging giving
- 24:40different options you can pay through
- 24:42credit card by scan by mobile so if you
- 24:45are accepting if you are forcing your
- 24:47sometime this happens if you are forcing
- 24:49your customer that you pay only by cash
- 24:51right sometimes they do not turn on the
- 24:54AC so these kind of things so then you
- 24:57are rating the each driver you are each
- 24:59ride you are rating so now drivers know
- 25:03that if they are getting less uh
- 25:06feedback so next time whenever there
- 25:09will be ride option or maybe any
- 25:12customer is placing the order the nearby
- 25:15best car driver will take that order
- 25:19right because that is their system is
- 25:21working on that distance minimum if so
- 25:23many taxi drivers are there who will get
- 25:26the order who is having the maximum fi
- 25:28that's that's why after completing the
- 25:29right they are usually asking customers
- 25:32to give them the best rating right so
- 25:34what are the vendor rating steps you
- 25:36need to define the evaluation criteria
- 25:38very clearly right and I told you this
- 25:41may vary with the industry somewhere in
- 25:43Industry maybe price is very important
- 25:46where you are talking about the
- 25:47repetitive items routine items right
- 25:50where you need to be efficient your home
- 25:52appliances industry sometimes you are
- 25:55talking about quality is very important
- 25:57when you talk about High status product
- 25:59right when you talk about Rolex when you
- 26:01talk about uh BMW sometimes you talk
- 26:04about the safety parameters are very
- 26:06important then you don't want to
- 26:08compromise with safy quality uh right
- 26:11price can be increased right so then if
- 26:13you are uh supplying components uh let's
- 26:16say to airline industry right who is
- 26:19building the ship so then there there
- 26:22the uh importance of the same screw
- 26:24screw you are using in your uh desk
- 26:28screw you are using in your chair screw
- 26:30you are using in car screw you are using
- 26:33in Aeroplane you just see how it is
- 26:37important when you are using the same
- 26:39screw In the Aeroplane right so their
- 26:41safety import uh parameters are very
- 26:43important once you have picked the
- 26:45criteria you need to evaluate all the
- 26:47criteria right let's say if you are
- 26:50you're buying
- 26:52shirt what can be the different criteria
- 26:54to buy a shirt right there can be cost
- 26:58then
- 26:59quality then brand maybe you are very
- 27:02particular about the brand then
- 27:06comfortness then maybe
- 27:09availability right these can so many
- 27:12other things can be there now for me
- 27:16maybe uh one person is very very uh
- 27:19particular about the comfortness so I'll
- 27:21give the maximum weightage to let's say
- 27:2330% to comfortness then may next uh
- 27:28Criterion maybe I will give 20% to
- 27:31Quality next maybe I'll give maybe 15%
- 27:34to cost next maybe I'll give 10% I'm
- 27:38very brand Consciousness right likewise
- 27:41I'll rate all because all criteria are
- 27:43not equally important but the other
- 27:46person may be cost is very important
- 27:48will give the 70% weightage then I'll go
- 27:51with maybe rest 30% then I'll see the
- 27:54quality maybe 10% I'll see the brand 5%
- 27:59likewise I the other person right that
- 28:01depends upon the person to person how
- 28:04they are doing that so this assigning of
- 28:07the way to criteria will happen uh will
- 28:09be done using that once criteria are set
- 28:12now you will gather data and where from
- 28:15where you will gather the data you are
- 28:17continuously perform uh recording the
- 28:19performance of the uh vendors uh through
- 28:23your iqc from where you are checking the
- 28:25lot through your production floor we are
- 28:27zero hour res is coming through your
- 28:29accounting purchase Department how
- 28:31quickly they are accepting the order how
- 28:33quickly they are processing the order
- 28:34and when you are making the payments and
- 28:36how they are settling the issues so then
- 28:39you will record data on all those
- 28:41parameters once it is done you will
- 28:43evaluate the Performance Based on
- 28:46whatever score maybe 1 to 10 1 to 10
- 28:48score you calculated but for all maybe
- 28:51you will not Calculate 1 to 10 if cost
- 28:54is important so you'll wait little
- 28:56higher then maybe L is the quality so
- 29:00then quality you will rate 1 to8 scale
- 29:02some other maybe brand you will rate
- 29:05maybe 1 to 5 scale depending upon
- 29:07whatever weight you want to offer
- 29:09otherwise out of 10 you can give the
- 29:11score and then each score you can
- 29:13multiply with their weightage if cost is
- 29:1610 uh maybe 20% so whatever score you
- 29:20are getting for cost you multiply by 020
- 29:23right and if you are giving quality
- 29:25maybe 15% you multiply quality score
- 29:28Maybe by .15 this is how you will find
- 29:32out the performance and overall rating
- 29:34you will sum up all the score for all
- 29:37vendors V1 what is the vendor rating V2
- 29:40what is the vendor rating V3 like this
- 29:42we'll find out then we'll review and
- 29:44validate because for every lot you are
- 29:47receiving from that vendor you are
- 29:48making those valuations so keep on
- 29:51checking evaluating right so we give you
- 29:54continuous feedback and then this result
- 29:56will be given back to the vendor so that
- 29:59this should be very transparent so that
- 30:01they can make the improvements right so
- 30:04Ola should share their feedback with the
- 30:05drivers as well so that driver should
- 30:07know that this time he made this mistake
- 30:10did not turn on the AC properly so that
- 30:12that's why he got little lesser ranking
- 30:15right then use ratings for decision
- 30:18making next time
- 30:20Olaf fed that in their system so based
- 30:23on ranking based on how near that taxi
- 30:26driver is the will allot the rides to
- 30:30different taxi drivers so what are
- 30:32different techniques we'll quickly go
- 30:33through these methods how we can
- 30:35calculate the vendor rating categorical
- 30:38plan is first subjective method where
- 30:40you can you say quality is one delivery
- 30:43is another one price is another one
- 30:45let's say three parameters are there
- 30:47quality maybe sub parameters are there
- 30:49delivery sub parameters are there price
- 30:52also sub parameters are there so either
- 30:54good or satisfactory or poor you will
- 30:56rate on each subdimension each sub
- 30:59parameter right this is categorical plan
- 31:02but this is uh subjective method right
- 31:06because if I am evaluating on quality
- 31:09what is good for me may be very good for
- 31:11other person or may be satisfactory for
- 31:13other person because my evaluation uh uh
- 31:18in whatever mind state I'm having at
- 31:20that time or maybe usually my evaluation
- 31:23is maybe uh sometimes we usually say we
- 31:27usually get this feedback as teacher
- 31:30that marking is very strict the other
- 31:32person says that may marking is very
- 31:34lenient right same person evaluating the
- 31:36same question paper weighted plan
- 31:39already I talked you let's say
- 31:41quality one uh person got out of 10 we
- 31:45are uh evaluating vendor one right so
- 31:48vendor one got eight on quality delivery
- 31:51sevens price five right so now I'll
- 31:55provide the weightage quality is let's
- 31:57say 4 % important this uh delivery is
- 32:01let's say uh 35% important and then rest
- 32:05is25 I think so that is important so
- 32:08whatever score I will get out of this by
- 32:10multiplying this I'll sum up this score
- 32:12this is the vendor uh weighted Point uh
- 32:15rating for vendor 1 same way I'll
- 32:18calculate the weighted Point rating for
- 32:20vendor 2 34 right cost ratio Plan cost
- 32:25ratio plan is calculated whatever is the
- 32:27cost occurred to acquire those Services
- 32:31right so if I'm talking about let's say
- 32:33the example is the delivery cost is
- 32:355,000 rupees and the total cost of
- 32:38acquiring that lot is 1 lakh rupees so
- 32:42delivery cost ratio will be how much
- 32:44delivery cost is adding to the total
- 32:46cost so this is 5,000 divided by 1 lakh
- 32:50will be 10% that means whatever order we
- 32:53are placing delivery cost is adding 10%
- 32:56into that so we can see whether we where
- 32:59is The Benchmark if other Industries are
- 33:01managing somewhere around 7% delivery
- 33:04cost that means we need to make sure
- 33:06make efficient our delivery Logistics
- 33:09distribution Network the inventory cost
- 33:11is let's say 20% so other Industries are
- 33:14maintaining somewhere around 12 to 133%
- 33:16why our inventory cost because we are
- 33:18keeping extra stock so that cost to
- 33:20ratio M you can maintain Force decision
- 33:23Matrix this is a kind of pair wise
- 33:25comparison Matrix we are doing where we
- 33:28are evaluating the set of criteria with
- 33:30respect to each other criteria one
- 33:33quality is important than delivery so if
- 33:36it is so we'll assign weight one
- 33:38otherwise we'll assign weight zero this
- 33:40is just how you can assign weights right
- 33:42service cost ratio particular Services
- 33:46you are providing like intangible
- 33:47services so then you can you know
- 33:50providing those extra Services see if we
- 33:53are saying that any uh you know problem
- 33:57with using this product or Services you
- 33:59can call our customer care center that
- 34:02means setting up customer care services
- 34:04is cost to me right so that is cost this
- 34:08is how you can understand so IVM quality
- 34:10rating system so they are calculating
- 34:12the quality cost means desired cost of
- 34:16inspection and actual cost because
- 34:19always actual cost of inspection is uh
- 34:21inspection is higher right so how we can
- 34:24reduce the cost of inspection I talked
- 34:28about in quality uh Insurance when we
- 34:31talked about quality tools how quality
- 34:34is free so the purpose of quality
- 34:37department is not to inspect qu the
- 34:40purpose is to seize the whole inspection
- 34:43no inspection should be there because we
- 34:46want that it should be error free so how
- 34:48we can error free when there is no
- 34:50inspection is required right when you
- 34:52are error fee well quality rating system
- 34:55this is how many Lots you are receiving
- 34:58uh and then how many are rejected right
- 35:01so based on that ratio you are defining
- 35:03that lot Quality Index what is lot
- 35:06Quality Index so how you are
- 35:07prioritizing different scenario let's
- 35:10say L1 is lot one you
- 35:13accepted as it is no rejection is there
- 35:17then L2 number of lots rejected by
- 35:20sampling but still you labeled means you
- 35:22segregated you run that lot in the
- 35:24production line right number of lot
- 35:27rejected and dispositioned rored at the
- 35:30supplier end segregated at the supplier
- 35:32end then Lots rejected and returned back
- 35:36so that means that means if you are
- 35:39returning back those component that is
- 35:41cost Transportation cost right once you
- 35:44received again you send back that
- 35:45Transportation Cost Storage cost
- 35:48inspection cost again they will
- 35:49transform it and then will maintain it
- 35:52and then you are getting the repaired
- 35:55product when I'm paying for new prodct
- 35:57product why I should use the repaired
- 35:59one so as this will grow you you can see
- 36:04here the cost priority is attached
- 36:07higher when you are you know sending
- 36:09back the material that means the
- 36:10performance will be reduced so this is
- 36:13what I'll share with you one quality
- 36:16format uh which in Industry we are using
- 36:20you can just go through okay so here is
- 36:23one vendor rating format which I used to
- 36:26use when I was uh
- 36:28uh working as you know quality engineer
- 36:31so in one of the organization so you can
- 36:33see so this is uh the vendor rating
- 36:36right uh by co-maker whosoever co-maker
- 36:38means manufacturer vendor rating for
- 36:40particular vendor number is defined and
- 36:42then date of issue vendor cender name
- 36:45you can mention here the part name or
- 36:48code part code right because different
- 36:51component small small components are
- 36:52there if you are using 10 different
- 36:54types of screw so that code will be
- 36:57different for all right so all that
- 36:58information will come and then you can
- 37:00see the first one is quality so quality
- 37:03means all the parameters related to
- 37:06Quality see now quality description
- 37:09sheet this is the sheet I was talking
- 37:12about how you are developing the quality
- 37:13description sheet you have defined the
- 37:16screw diameter thread diameter then the
- 37:20length of the screw that is quality
- 37:22description sheet and then bizi you are
- 37:24inspecting color you are inspecting
- 37:26flavor you are inspecting whatever
- 37:28Dimension you are recording that comes
- 37:30under your quality description sheet now
- 37:32based on that either you will accept the
- 37:34lot or reject let's say uh because this
- 37:37is done for 25 Lots if all 25 lots are
- 37:41accepted that means 0% rejected that
- 37:44means that vendor will get five out of
- 37:47five if two loads are rejected vendor
- 37:50will get one score right so this is one
- 37:53parameter then quality complaint note so
- 37:56how many quality comp complaint notes
- 37:58you raised against that vendor let's say
- 38:01no quality complaint note to the vendor
- 38:04that means five rating no complaint
- 38:06against that vendor so accordingly one
- 38:08complaint two complaint you will assign
- 38:10the rating then once you raise the
- 38:13quality complaint how quickly you are
- 38:16getting the Kaa corrective action and
- 38:18preventive action and they have done the
- 38:20corrective measures and sent you the
- 38:22report let's say if one uh your supplier
- 38:26is you you know kaapa report he has
- 38:29submitted and no reputation in next 10
- 38:33lots that means he'll get the 10 out of
- 38:3610 right because he quickly uh worked on
- 38:40that and improved that right so then you
- 38:43can see this is not fixed it should be
- 38:4510 only for some product you may take 20
- 38:48for some product you may take five right
- 38:50so this is just one example detailed
- 38:53inspection report if your vendor is
- 38:56sending sharing with you all the time
- 38:58detailed inspection report means
- 39:00whatever lot you are inspecting that
- 39:02means you will give five if he is not
- 39:03sharing you can give zero in
- 39:05intermediator level also you can assign
- 39:08vendor process maturity and setup so how
- 39:13mature he is with the process iqc pqc
- 39:16oqc means all quality measures they are
- 39:19taking right they have standardized
- 39:21their production process so five means
- 39:23then if they are generating all these
- 39:26reports they will get five right then
- 39:28vendor aligned to this is uh related to
- 39:30Philips program because I was working
- 39:33with that so uh uh there is flips B
- 39:36program right under that program if you
- 39:39are fully aligned whatever measures they
- 39:41have suggested you have also implemented
- 39:44so then five points right if any means
- 39:46particular suggestion from any P right
- 39:49so rejection part on the line this is
- 39:51what I was talking about your Zero Hour
- 39:54rejection you started using the screw
- 39:56but suddenly you realiz that the d uh
- 39:59the cap is missing the thread is missing
- 40:02right so then how many times how how
- 40:04much is the rejection 100 units you are
- 40:07using what is the rejection rate less
- 40:10than 0.1% you will give five marks uh
- 40:12somewhere equal to less than 2% you will
- 40:15give three marks likewise now this is
- 40:17related to Quality now next is price
- 40:20performance so obviously ply Pro
- 40:22performance how you will record whether
- 40:24that person has increased the price
- 40:26maintained the the same price or lower
- 40:28down the price if lower down the price
- 40:31by 5% you'll give 10 because maybe you
- 40:35have increase the lot quantity if less
- 40:37than by 2% you will give the five marks
- 40:40right if the person has increased the
- 40:43price you will give the zero marks right
- 40:45so this is how you'll uh do the pricing
- 40:49okay so then delivery so related to
- 40:51delivery whether you are receiving all
- 40:53the deliveries within plusus 5%
- 40:56deviation or 7% % deviation one or two
- 40:59days here and there you will this this
- 41:02see you can see the highest priority is
- 41:05given here to the delivery right 40
- 41:08marks if you are delivering on time
- 41:10you'll get 40 marks right so delivery is
- 41:12very important responsiveness how
- 41:15quickly you are generating the report
- 41:17Capa report or how quickly you are
- 41:19responding to your you know uh whatever
- 41:22complaint your manufacturer is Raising
- 41:25and how quickly you are you know uh
- 41:28confirming the purchase order once the
- 41:30purchase order is accepted and then you
- 41:32are confirming it within 3 days so that
- 41:35means you'll get three marks right so
- 41:37here confirmation is not that important
- 41:40but you can see here the delivery is
- 41:43very important because if somewhere I
- 41:45will lack with the inventory my all five
- 41:48500 people will sit down idle on the
- 41:51production line so overall rating will
- 41:54uh calculate if it is less than 50 you
- 41:56will say poor if it is 80 50 to 80
- 42:00average anything more than 80 means good
- 42:03right so this is one format how you can
- 42:06go for the vendor rating so same way you
- 42:09can develop the vendor rating uh as per
- 42:12your uh industry requirement right so uh
- 42:17then advantages of vendor rating you can
- 42:19see minimize subjectivity in taking
- 42:22decisions obviously we discussed there
- 42:25is no power with the purchase Department
- 42:27that if they want to you know uh favor
- 42:31some vendors they cannot do that
- 42:33feedback from all area from purchase
- 42:36Department you are getting that whether
- 42:38they have raised the purchase price or
- 42:39not accounting how many days they are
- 42:42giving us to settle down the payment
- 42:44right then quality Department what are
- 42:46the quality features they are lagging
- 42:48your vendors are lagging delivery again
- 42:50store department will help us to find
- 42:52out that so all these departments are
- 42:55giving you the feedback back and that
- 42:58feedback is given back to the vendors so
- 43:00better communication will be there
- 43:02overall control to the vendors specific
- 43:05action if you are struggling with
- 43:07maintaining the inventory you will get
- 43:08that feedback right so continuously we
- 43:12will re review those standards so we can
- 43:14see that this vendor rating is so
- 43:17important if you can optimize vendor
- 43:19your because from where your supply
- 43:22chain is originating from the vendors so
- 43:25first pillar is vendor only so so if
- 43:27you'll manage that pillar uh very
- 43:30effectively efficiently there only the
- 43:32supply chain performance will start
- 43:34right we have included some qualitative
- 43:36quantitative measures so you can see
- 43:39this is not only the fixed criteria you
- 43:42depending upon your industry you can
- 43:45work on those criteria we have so many
- 43:47research papers your deciding the
- 43:50vendors picking the vendors vendor
- 43:52rating multicriteria decision making
- 43:55techniques are there we are using
- 43:56methodology like uh analytical hierarchy
- 43:59Process net analytical Network process
- 44:01tops is to you know set the Benchmark
- 44:05and demal Analysis multicriteria
- 44:07decision- making tools we are using to
- 44:09evaluate the performance of the vendors
- 44:11to find out where they are right now
- 44:14what is the gap how we can fill that Gap
- 44:16right so this is all about vendor rating
- 44:19these are some of the references you can
- 44:21go for further rating so thank you very
- 44:24much
About this transcript
This page contains the full transcript of Lecture 38 : Vendor Rating by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 6,939 words across 1,020 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.