- 0:26hello dear students welcome back to nptl
- 0:29online course on Logistics and Supply
- 0:30Chain management so in the last session
- 0:33we decided that what are the things or
- 0:35the functional area we need to inhouse
- 0:38and what are the things we need to
- 0:41produce or Outsource to some third party
- 0:45right so that decision we have made so
- 0:48throughout the complete value chain that
- 0:50supply chain what are the activities we
- 0:53have decided that we'll go for
- 0:54outsourcing so once you have decided to
- 0:57go for outsourcing then there comes the
- 0:59concept of strategic sourcing because
- 1:02why we are calling strategic sourcing
- 1:04because it involves long-term investment
- 1:07of the resources so you cannot change
- 1:10your vendors your sources your
- 1:13stakeholders overnight right so and also
- 1:17if maybe one or two vendors are
- 1:19struggling with something quality price
- 1:22delivery so even then you don't want to
- 1:25delete those suppliers right from your
- 1:27list because every supplier is equally
- 1:31important maybe you got cheaper vendors
- 1:34or suppliers quality wise also overseas
- 1:37right but what if something goes wrong
- 1:41and that overseas supplies is
- 1:43interrupted then you need to depend on
- 1:45the local vendor maybe the cost you are
- 1:48saving by deploying the overseas vendors
- 1:51maybe that you can save by deing maybe
- 1:54just in time with the local vendor right
- 1:57so these are some of the pros and cons
- 2:00so that's why this is strategic sourcing
- 2:02once we have decided we'll go for
- 2:04sourcing what are the key elements we
- 2:06need to decide for getting those
- 2:08strategic sourcing Partners right we'll
- 2:11talk about supplier selection now what
- 2:15are the different options available and
- 2:17we'll evaluate those options we'll
- 2:19maintain the relationship under supplier
- 2:22relationship management and then we'll
- 2:25identify we'll categorize different
- 2:28suppliers as per their role their
- 2:30importance we'll talk it in the supplier
- 2:33segmentation and then we'll talk about
- 2:35the global sourcing as well some aspects
- 2:38of that and we'll end this discussion
- 2:40with one case study so strategic
- 2:43sourcing is identification evaluation
- 2:47and selection of suppliers once you
- 2:50decided we'll
- 2:51Outsource the sub assembly part
- 2:54Transportation part or warehousing let
- 2:57us find out how many uh players are
- 3:00there in the market we'll identify we'll
- 3:03evaluate as per our criteria whatever
- 3:05criteria we have set it's not only we
- 3:08will focus on lowcost supplier it's the
- 3:12purpose very purpose here is strong
- 3:14relationship improve quality delivery
- 3:17performance reduce cost and mitigate
- 3:20risk sometime you'll get the cheaper
- 3:22supplier but you are always struggling
- 3:24with getting the right quality sometime
- 3:28maybe you are getting the cheap material
- 3:30may be fair quality that delivery person
- 3:33is uh or your raw material supplier is
- 3:36always struggling with the
- 3:38Dy what if there is any uncertainty in
- 3:42the market how you will share the uh
- 3:44risk of uncertainty with the raw
- 3:46material supplier but raw material
- 3:48supplier the he is saying that I'll
- 3:51produce whatever you have ordered now if
- 3:53you'll ask me to change to some other
- 3:55pattern other design other material so
- 3:58you will pay for this whatever I have
- 3:59have developed the infrastructure here
- 4:02whatever the raw material machines I
- 4:04have acquired right so what are the
- 4:08factors like product and process
- 4:11specifications what you are developing
- 4:13right what are the available suppliers
- 4:16in the market and customer service to
- 4:19determine the feasibility of sourcing
- 4:21materials locally or globally we'll talk
- 4:23about in detail in global sourcing right
- 4:26when we'll talk about the uh developing
- 4:29your vendors overseas right so uh this
- 4:32includes the development of sourcing
- 4:34strategy negotiating contracts
- 4:37establishing partner relationship now
- 4:39negotiating contracts uh other than your
- 4:43delivery quality price those are there
- 4:45in your negotiation terms and conditions
- 4:48but then if something goes wrong if any
- 4:52dispute is there where you will handle
- 4:54how you will handle right that also you
- 4:56need to Define if you have uh if you you
- 5:00have accepted the vendor lot as per the
- 5:03quality quantity in how many days you
- 5:06are going to make the payment that
- 5:08payment terms also you need to Define in
- 5:10the negotiate terms how you will be
- 5:12making payments in installments or how
- 5:14you will how you will be you know
- 5:17allocating orders you asked me as a
- 5:19vendor you asked me to you know develop
- 5:21this much infrastructure but now you are
- 5:24diverting your whole order to some other
- 5:26vendor right I'm not getting those
- 5:28orders to
- 5:30reach at minimum qar you know quantity
- 5:34where I can be at the profit table
- 5:36position right so that breakable point
- 5:39I'm not able to reach so that you need
- 5:41to ensure so some characteristics of
- 5:44strategic sourcing this is disciplined
- 5:46buying process repetitive process it is
- 5:49not one-time process so maybe in one
- 5:52month depending upon the product and
- 5:54depending upon the components you are
- 5:55supplying maybe you are supplying five
- 5:57Lots 10 Lots or maybe 15 losss if that
- 6:01is high valued product because that much
- 6:03inventory I cannot keep right depending
- 6:06upon size also depending upon the
- 6:08product features characteristics also it
- 6:10depends upon how many repetitive uh
- 6:13procurements or purchasing you are doing
- 6:16right total cost Factor so total cost
- 6:20factor is not only the cost of the raw
- 6:22material it's the cost of acquiring the
- 6:25material right so that cost is if you
- 6:28are ensuring the quality quality will
- 6:30also take some cost Service delivery and
- 6:33other than delivery after sales services
- 6:36to maintain that relationship means
- 6:38total cost with one vendor if you have
- 6:41appointed one person to T or tap five
- 6:45vendors to you know negotiate with them
- 6:47to you know track the orders to raise
- 6:50the purchase order so that person cost
- 6:52is also included in that right
- 6:55Consolidated purchasing power that again
- 6:59strategic sourcing when you are going
- 7:00for you can leverage on high volumes
- 7:03right but then again if you are
- 7:05producing higher what actually is
- 7:07required so that means you are creating
- 7:09inventory so that inventory cost holding
- 7:11cost is good enough to go for or uh you
- 7:16want to leverage on the high value that
- 7:18is tradeoff you will make right tight
- 7:21supplier relationship it is up to you
- 7:24whether you are keeping your
- 7:26relationships or your vendors arms
- 7:28length away or you are keeping just
- 7:31shoulder length away how closely you are
- 7:33working with the having said that arms
- 7:35length away means that means your uh
- 7:40those strategic Partners Outsourcing
- 7:43partners are not your you know complete
- 7:45stakeholders of your value chain right
- 7:49so that relationship you need to Define
- 7:52that depends also what type of product
- 7:54you are buying whether very close
- 7:56relationship is required whether you
- 7:58need to set up you some sometimes you
- 7:59are asking your vendors to set up their
- 8:02facilities near to your production house
- 8:04so that just in time can also be ensured
- 8:07but whether that vendor is ready to set
- 8:09up he will be ready when you will ensure
- 8:12that we will feed you large orders and
- 8:15that break even point you can reach
- 8:18right where after that break even point
- 8:20you will start producing profit improved
- 8:22tream work and purchasing
- 8:25skills so now teamwork means whenever
- 8:29you are going for negotiation you are
- 8:31going for outsourcing it's not only one
- 8:33person game that one person is
- 8:35developing the Outsourcing Partners all
- 8:37the person from different department
- 8:39Logistics operation marketing accounting
- 8:42purchasing store department so that all
- 8:45the possibilities you can record all the
- 8:48terms condition can be included in
- 8:51the that negotiation uh legal document
- 8:55right so if only one person is
- 8:58representing all the the functional
- 9:00units maybe the person can miss that
- 9:02right so this is teamwork realigning
- 9:06business processes now you need to
- 9:09realign or reevaluate your business
- 9:11processes right and your business
- 9:14processes with your strategic sourcing
- 9:17Partners right if you have aligned
- 9:20properly quick information sharing is
- 9:22there transer transparent information
- 9:24sharing is there that means that placing
- 9:27order waiting for the order then
- 9:30tracking the order then you know always
- 9:32you are after the vendor where is the
- 9:34raw material where is the lot so then
- 9:37that cost can be minimized lead cycle
- 9:40time can be reduced inventory cost can
- 9:42be reduced because whenever you are
- 9:45requiring the material your raw material
- 9:47supplier is feeding you that material
- 9:49why you will maintain the inventory
- 9:51continuous Improvement will be there
- 9:53when uh you will be setting up the key
- 9:56performance indicators for your vendors
- 9:59for yourself as well so I have seen some
- 10:01of the manufacturers like if I have
- 10:03worked with the a India limited I have
- 10:06worked with the phlips uh manufacturing
- 10:09coakers as well so basic point I'll tell
- 10:13you here continuous Improvement what
- 10:15Phillips is doing they are asking all
- 10:18the vendors to generate the quality
- 10:20report of all the components they are
- 10:22supplying right so that means whenever
- 10:25I'll receive any lot they will send me
- 10:27the quality report of that lot
- 10:30quality report means all the checks will
- 10:31be there in the next session we'll talk
- 10:33about the vendor rating where we'll see
- 10:35what are the different parameters all
- 10:37the dimensions you want to check you
- 10:39want to check aesthetically the position
- 10:43of the product right so Those comp uh
- 10:45already you have given uh vendors the
- 10:48checklist that whenever you are sending
- 10:50lot based on certain sampling you need
- 10:52to ensure that right this is what
- 10:54Philips is doing and when the product
- 10:57lot is reaching to the man manfacturing
- 10:59unit again their incoming quality
- 11:02control is checking the quality again it
- 11:04is checked in the process again it is
- 11:07checked when the final product is ready
- 11:09in the outgoing Quality Control
- 11:11Department so this is how not only the
- 11:14manufacturing unit you are focusing to
- 11:16improve the quality you are focusing to
- 11:18improve through your vendors also who
- 11:21are providing the raw material right
- 11:23focus on value creation this very basic
- 11:27example I quoted how you can create
- 11:29value by ensuring the quality at
- 11:31different stages and will help you to
- 11:34you know uh develop the loyal customers
- 11:36and will satisfy customer right next is
- 11:39supplier selection and management
- 11:42so uh now you have identified all the
- 11:46potential Alternatives available in
- 11:48terms of number of vendors and suppliers
- 11:50now you will go for selection and then
- 11:52we'll talk about supplier relationship
- 11:53management so you'll talk about
- 11:55importance of
- 11:56supplier depending upon
- 11:59uh there may be some factors like unit
- 12:03cost right reducing the total cost of
- 12:05acquisition meeting customer requirement
- 12:07relying on few suppliers and depending
- 12:10on supplier for Designing importance of
- 12:12supplier we can find out we can
- 12:15categorize as per the component he is
- 12:17supplying there are two ways how you can
- 12:19find out one is
- 12:21quantity another one is your
- 12:26quality so so depending upon
- 12:29the quality of the product sometimes the
- 12:32product quality Fair quality will also
- 12:35work right because that component is not
- 12:38very very important in that functioning
- 12:40of the product right so that if let's
- 12:43say uh you are manufacturing AC so in
- 12:47inside AC whatever binding you are using
- 12:50whatever machine you are using very very
- 12:53important right cooling unit you are
- 12:55using very very important PCB you are
- 12:57inserting inside to control the
- 12:59programming of the AC is very very
- 13:00important remote you are using is very
- 13:03very important but what about the outer
- 13:06casing plastic casing you are using so
- 13:10even if you are somewhere compromising
- 13:12with the qual because once it is hanged
- 13:14so as long as you are not touching you
- 13:16are not dropping so that much hardness
- 13:19or quality is not required so there
- 13:21maybe you can so then you can based on
- 13:23quality you can distinguish based on
- 13:26quantity how much you are buying from
- 13:28that particular particular vendor we'll
- 13:29see in Vendor segmentation in detail
- 13:32right supplier relationship already I
- 13:35talked about whether you are keeping at
- 13:36arms length or you are keeping at very
- 13:39near to you that depends upon you
- 13:41supplier selection criteria so now
- 13:44quality delivery performance history
- 13:47warranties claim policies production
- 13:49facility capacity their potential their
- 13:52technical potential their SK human
- 13:54skills right their scale up scale down
- 13:57capabilities their financial position
- 14:00industrial relations how they are
- 14:02dealing with other vendors so many
- 14:05things you can record once when you are
- 14:07going for supplier selection once
- 14:10supplier is selected some of the
- 14:13parameters are obsolete history is gone
- 14:17how he is dealing with other vendor is
- 14:19gone their financial position may be may
- 14:21not be very important then you will keep
- 14:23track of what quality he is delivering
- 14:25once it is selected quality is
- 14:27delivering Price He is giv
- 14:29delivery performance these three are the
- 14:32major there are certain parameter but
- 14:34the three will take the maximum share as
- 14:38long as your vendor is doing fairly well
- 14:41on these three you will still you can
- 14:44carry with that cost supplier evaluation
- 14:47so continuous evaluation will be there
- 14:50that is one thing when you are receiving
- 14:52the Lots you are providing the
- 14:53evaluation feedback right how the lot is
- 14:56doing right so but the another very
- 14:59basic point it's not only to you know
- 15:01select or reject uh the lot of the
- 15:04vendor to improve the quality of the raw
- 15:07material you are getting from the vendor
- 15:09is also your shared responsibility right
- 15:12so if vendor is not doing well with
- 15:15certain parameters you need to develop
- 15:17those vendors for those parameters right
- 15:20so that is also your Define will how
- 15:22closely you are working with your
- 15:24vendors your relationship supplier
- 15:26certification let us
- 15:27say my manufacturing unit says that we
- 15:30are always environmental conscious we
- 15:32are always quality conscious three main
- 15:34features environmental conscious we are
- 15:38quality Top Class quality we are
- 15:40providing to our customers and work
- 15:44heising work safety hyene
- 15:48parameters our employees these three are
- 15:51major concern and I am as a vendor
- 15:53approaching to you I'm saying sir we are
- 15:57ISO
- 15:599,1
- 16:01certified that is for Quality we are ISO
- 16:0514,1 certified we are 45,1 certified so
- 16:11that means if you are ISO certified that
- 16:15is fair enough for me because you are
- 16:17maintaining all the records you are
- 16:18taking care of all those measures very
- 16:20easy for me to make the
- 16:22decision then supplier management once
- 16:25it is done how you will manage the
- 16:27supplier how you'll help them to improve
- 16:29the performance to monitor the
- 16:31performance and if any issues are there
- 16:33let's say if they will upgrade their
- 16:36technology there will be Improvement but
- 16:38upgrading the technology they don't have
- 16:40those financial you know resources so
- 16:43how you can help them benefits of
- 16:45strategic sourcing already we talked
- 16:47about if you have those close
- 16:49relationship strategic sourcing how you
- 16:51it can impact your business performance
- 16:54now we'll talk about supplier
- 16:56relationship
- 16:57management once suppliers now vendor
- 17:00selection is done for one component we
- 17:03have now decided that we'll go for
- 17:06vendor 1 vendor two vendor three vendor
- 17:09four four vendors we are maintaining for
- 17:11this particular component right now how
- 17:13we'll manage the relationship with these
- 17:16font vendors and it is also there that
- 17:18all four vendors are not giving you
- 17:20equal quality equal price equal delivery
- 17:23time schedule right equal contract terms
- 17:26different contract terms will be there
- 17:28some may be Prov giving you just in time
- 17:31some may be asking you to hold the
- 17:32inventory depending upon overseas vendor
- 17:35some are very good with the quality so
- 17:37how you will collaborate that
- 17:39collaboration will decide the mutual
- 17:42beneficial relationship both for both
- 17:44right so that will only happen if you
- 17:47have trust open communication and it's
- 17:50not only as a manufacturer I'm
- 17:52maximizing my profit I should ensure
- 17:56that my customer profit is also Max
- 17:58maximized right and then if it is so we
- 18:03can share the risk we can mitigate the
- 18:05risk and we can have the access to the
- 18:08resources of the other organization like
- 18:11technology like skills we can use that
- 18:13right so this involves supplier
- 18:16selection contract negotiation
- 18:18performance measurement joint planning
- 18:20and risk management
- 18:22right so to establish supplier
- 18:25relationship management first is you
- 18:26need to define the supplier relation uh
- 18:29relationship management right
- 18:31relationship management means that
- 18:33should align your strategy very basic
- 18:36example I'll code here let's say as a
- 18:39manufacturer I want to take risk but my
- 18:42supplier wants to play in a safe
- 18:45environment so what I'm doing as risk
- 18:48taking player I'm doing you know
- 18:50Innovation and then coming with a new
- 18:52product new features so quickly asking
- 18:54my supplier to change the design of the
- 18:56raw material whether he is is ready to
- 18:59do that because he wants to deal with
- 19:01those products items where the you know
- 19:04saturated kind of demand is there so I
- 19:07need to align the strategy key identify
- 19:11key suppliers out of those suppliers now
- 19:13who are going with our strategy or who
- 19:16are ready to changee their strategy as
- 19:18per our strategy we need to pick those
- 19:20we need to identify those suppliers then
- 19:23we need to assess their capabilities now
- 19:25they are ready to change the design the
- 19:28change the the process the change the
- 19:29quality parameters their Dimensions
- 19:32whatever product or component they are
- 19:35providing we need to assess the
- 19:38capabilities maybe you can ask their
- 19:40capacity their turnover their Market
- 19:43expansion strategies their Manpower
- 19:45skills their technical skills how
- 19:47frequently they are renovating so those
- 19:49capabilities you need to analyze
- 19:52establish governance structure right so
- 19:55now you need to define the roles
- 19:57responsibilities and decision- making
- 19:58process right let's say the example we
- 20:01talked about when we was talking about
- 20:03you know that uh how we can handle the
- 20:06uncertainty and sometime what we were
- 20:08saying that as a retailer our retailer
- 20:11is absorbing the maximum uncertainty
- 20:14manufacturer and raw material suppliers
- 20:16are not handling the uncertainty so they
- 20:19should be most efficient our retailer
- 20:22should be most responsive because he
- 20:25needs to meet all the orders so then
- 20:28margin should be be higher with the
- 20:30retailer not with the manufacturer and
- 20:31suppliers so that governance you need to
- 20:35uh set the proper rules right then
- 20:38supplier collaboration
- 20:40initiatives if supplier is lacking
- 20:42somewhere with the technology and he
- 20:44wants to you know come up with you and
- 20:47wants to develop that technology how you
- 20:49can help your supplier invest in
- 20:51technology let let's say very small
- 20:53supplier cannot implement the supplier
- 20:56management software inventory management
- 20:58soft software we are talking about
- 20:59vendor managed inventory right
- 21:02warehousing softwares so but those
- 21:05softwares are very helpful we we have
- 21:07analyzed but that small vendor cannot
- 21:09analyze so how we can Implement those
- 21:11softwares uh at the vendor end and will
- 21:14get the you know profit for both right
- 21:17Foster open communication already we
- 21:19discussed about transparent open
- 21:21communication will help them to develop
- 21:23that trust to develop that relationship
- 21:26right Implement performance metric
- 21:29now kpis we have we we we are tracking
- 21:33the performance of individual those four
- 21:35suppliers we finalized and for each lot
- 21:38we are finalize uh we are tracking the
- 21:40performance of the lot against those uh
- 21:43parameters so then we can uh provide the
- 21:46feedback and how they can uh see if I am
- 21:49manufacturing unit I'm in charge of
- 21:52incoming quality control as I have
- 21:54worked as incoming quality control
- 21:55engineer with the every India limited
- 21:57right so what we were doing we were
- 22:00inspecting lot coming from different
- 22:02vendors and certain B sampling based
- 22:06right and if that lot is passed in the
- 22:08sampling we are passing the lot to the
- 22:10production or otherwise it is rejected
- 22:12complete lot rejected means will be
- 22:14shipped back to the vendor so it's not
- 22:18only the responsibility of the iqc there
- 22:21I have learned that so why don't our iqc
- 22:24team visit the vendor location and help
- 22:28them with setting up those parameters
- 22:30help them maybe with changing the design
- 22:32changing the equipment changing the
- 22:34technology let them understand what are
- 22:37our requirements why your lot is failing
- 22:39because just failing rejecting the lot
- 22:42will not help either the manufacturing
- 22:45unit or the vendor and then development
- 22:48programs this is what I was talking
- 22:49about why don't you conduct some uh
- 22:52vendor development programs so I have
- 22:54seen like L&T HS ABB so what they are
- 22:59doing for electrical they are coming
- 23:01with you know new new solutions for
- 23:03controlling the lighting system for
- 23:05controlling your Electrical Supply
- 23:08electrical equipment so what they are
- 23:10doing they have the close collaboration
- 23:13because they are not selling they are
- 23:14not having their own retail shop they
- 23:16are selling through different retailers
- 23:18for all those major retailers time to
- 23:21time they are organizing seminars where
- 23:23they are treating them very well and
- 23:26then they are educating them about the
- 23:28new products right so that means once
- 23:31you know all the features of the new
- 23:33products only as a marketing or sale
- 23:35team you can convince your customer that
- 23:37these are the new product coming from
- 23:39hav these are the new products how you
- 23:41can control from one point you can
- 23:44control the electricity of your whole
- 23:46house how you can install the smart
- 23:48electricity management system right so
- 23:52that that is the thing objective of
- 23:54supplier relationship management
- 23:56obviously if we'll talk about first two
- 23:58three will contribute about 70% 80/20
- 24:02rule of parto principle so you need to
- 24:05cover 20% of the items 80% objectives
- 24:09can be completed leverage on supplier
- 24:13capability so let's say Apple is very
- 24:16good with manufacturing but not with the
- 24:18distribution they are selling through
- 24:20online let us collaborate with United
- 24:22Parcel Services and then sell your
- 24:25product throughout the world right if
- 24:29you have doubled that image why don't
- 24:32you make it available for everyone when
- 24:34everyone knows about your product so
- 24:36then you can leverage UPS you can
- 24:39leverage DHL Services right cost
- 24:43reduction Target obviously apple is
- 24:45doing with China where they are reducing
- 24:47the cost now they are Outsourcing to
- 24:49India where they are reducing the
- 24:51production cost Phillips is not
- 24:53manufacturing their product they are
- 24:54Outsourcing to their manufact co-
- 24:56manufacturer reducing the manufacturing
- 24:58cost
- 24:58security of supply and then you can have
- 25:02multiple vendors some nearby vendors
- 25:04some overseas vendors so overseas
- 25:06vendors you can maintain quality and
- 25:08price with nearby vendors you can ensure
- 25:12the smooth Supply if anything goes wrong
- 25:14with some party the other can ensure the
- 25:17complete Supply so this you will become
- 25:20the customer of choice it's not that
- 25:22that you are picking some vendor uh
- 25:26forcefully that also happens when we
- 25:28have some Industries like uh if you are
- 25:31processing petrol or diesel crude oil is
- 25:34coming you have to buy only two three
- 25:36players are there right so then we don't
- 25:38have so many options so many other
- 25:40objectives are there you can see we can
- 25:42have sustainable relationship uh
- 25:44enhanced relationship we can have access
- 25:47to global market local market we can
- 25:49expand our boundaries price we can
- 25:51negotiate we can be more effective those
- 25:54all are objective of uh supplyer
- 25:57relationship management but how some are
- 26:00challenges which are posed when we are
- 26:02talking about Supply relationship
- 26:04management if you are too focused on
- 26:06cost only always you are talking about
- 26:08cost you are not talking about the
- 26:09delivery of the product you are not
- 26:11talking about the quality of the product
- 26:12you are not talking about the changing
- 26:14variety of the product innovation of the
- 26:16product so customer is now getting bored
- 26:20so quickly that your product life cycle
- 26:23which earlier was maybe for for for
- 26:25product for 5 years now it has red used
- 26:28to only 2 years and there is study
- 26:33saying that almost 70 to 80% of the
- 26:37smartphone users they are changing their
- 26:39mobile phone every 2 three years just
- 26:43imagine how much waste is one thing but
- 26:47why they are changing because new
- 26:48features are coming and still you are
- 26:50saying that cost is very important so
- 26:52that is one
- 26:54challenge when you don't have alliance
- 26:57with the strategic partner like I quoted
- 26:59the example you are risk taking as
- 27:01manufacturer but your supplier don't
- 27:03want to take risk so you have picked the
- 27:05wrong supplier strategic objectives
- 27:08again the same thing you want to be
- 27:10responsive but your supplier want to be
- 27:12cost efficient so that alignment should
- 27:14be there there is no open communication
- 27:17right so how you are negotiating how you
- 27:20are developing the legal negotiating
- 27:22documents right so how you are ensuring
- 27:25the uh win-win situation for for your
- 27:28vendor as well that you will feed them
- 27:30large order how Walmart is doing that
- 27:33how strategically he has outsourced you
- 27:35know with the vendors that they are
- 27:38getting the minimum cost products and
- 27:40then selling those product throughout
- 27:42the world right so largest retailer
- 27:46chain in the world it's not that easy to
- 27:49be right how you know uh aliwa became so
- 27:53big in China you just imagine taking 5%
- 27:58GDP of China so how how big they are you
- 28:02know uh becoming so then they are
- 28:05collaborating with the local partner as
- 28:07well they are collaborating with the uh
- 28:10uh those foreign players supplier
- 28:13segmentation now this is important to
- 28:16segment your supplier which supplier is
- 28:18most important right so then you will
- 28:22understand how you can segment this see
- 28:25there there are two things right one is
- 28:28is
- 28:29quantity another is price another ways
- 28:32how you can do that maybe quantity you
- 28:36are using in millions right for maybe
- 28:40let's say Quantity you are using 50,000
- 28:43items but price is only let's say
- 28:485,000 but other hand you are using only
- 28:51200 pieces price is
- 28:5650,000 right so that means these are two
- 28:59parameters how you can segment the
- 29:01suppliers from one supplier may be very
- 29:04important because huge quantity he is
- 29:06supplying another supplier very
- 29:08important because he's not supplying
- 29:10huge quantity less quantity but
- 29:13valuable parts right if we'll talk about
- 29:15automobile industry engine is something
- 29:18very very important very very you know
- 29:22uh highly priced so the value is there
- 29:26but if you talk about uh
- 29:28many screws you are using many machines
- 29:30part you are using quantity is huge
- 29:33right but the value is less soic Matrix
- 29:38is there to Define our uh uh suppliers
- 29:42into four different categories strategic
- 29:44suppliers these are those suppliers
- 29:46which are adding high value to your
- 29:49profit but risk is also very high with
- 29:52those uh suppliers right High supplier
- 29:56risk is there leverage supplier they are
- 29:59helping you to get the high profit but
- 30:01Supply risk is always very less so these
- 30:04are suppliers where you can leverage
- 30:06right profit is very high but Supply is
- 30:08constant they are ensuring what next
- 30:10suppliers low profit High Supply you
- 30:13need to think about these because not
- 30:15adding much value to your profit but and
- 30:17then challenging right noncritical
- 30:20suppliers low profit low Supply risk
- 30:22this is one way how you can categorize
- 30:24your suppliers right so criteria for
- 30:28supplier segmentation how much you are
- 30:31spending on particular supplier if you
- 30:32are spending 80% of your budget on one
- 30:35or maybe two suppliers why don't you
- 30:37negotiate for higher price right why
- 30:40don't you go for lower cost right so if
- 30:43you are spending only 20% so then there
- 30:46is no point of you know negotiating on
- 30:48that risk how much your supplier is
- 30:51taking the risk if he is bearing more
- 30:54risk obviously you need to compensate
- 30:58the supplier criticality of the
- 31:00component some components are like ACI I
- 31:03told you not very critical related to
- 31:05safety related to functionality so then
- 31:08way that way you can still compromise
- 31:11with the quality ask him to reduce the
- 31:13price but if it is the key component The
- 31:16Binding copper Bing you are using
- 31:18aluminium winding you are using inside
- 31:20the AC right the PCB you are using to
- 31:23control so then those are very critical
- 31:26performance you this this is another
- 31:28based on performance performance you can
- 31:31record on quality performance you can
- 31:33record how quickly he is revising the
- 31:35prices price performance and then
- 31:38delivery performance are three major
- 31:39things always I'm talking about you are
- 31:42evaluating any supplier once supplier is
- 31:44fixed
- 31:46right majorly three things but there are
- 31:48so many other things like industrial
- 31:50relations negotiations how you are
- 31:52settling the issues with that supplier
- 31:55Market position of that supplier whether
- 31:57that supplier is known for the
- 31:59industrial relations known for the
- 32:02delivery whatever he is delivering in
- 32:03the market and geographic location very
- 32:06near can be very effective because we'll
- 32:08reduce the lead TI will help us to
- 32:10implement just in time will help us to
- 32:13reduce the inventory but if it is
- 32:15overseas vendor will help us to increase
- 32:19the quality will help us to reduce the
- 32:22price but will not Implement justtin die
- 32:25will not Implement that inventory zero
- 32:28inventory policies there is another
- 32:30analysis of ABC analysis how you can
- 32:34segregate based on quantity how much
- 32:36value they are covering small number of
- 32:39suppliers but they are contributing
- 32:42majorly right so maybe those suppliers
- 32:46only 10 to
- 32:4820% and they are taking almost 70% of
- 32:54the value engines you are uh using tires
- 32:58you are using right so the chess you are
- 33:01using right the steel body you are using
- 33:03maybe 20% of the suppliers carrying the
- 33:0670% of the cost then these are modulate
- 33:09suppliers these may be 30% suppliers
- 33:13right so they are spending maybe average
- 33:16spending right again maybe
- 33:2020% Then large number of suppliers maybe
- 33:23another rest 50% 40 to 50% of the
- 33:26suppliers but only contributing 10% in
- 33:29the total volume this I'm talking about
- 33:32in terms of the price they are charging
- 33:34economic or maybe you can also divide
- 33:37this in terms of quantity but price is
- 33:40maybe screw they are giving you screw
- 33:43but cost is very less right so but
- 33:46quantity is very high so that is depends
- 33:48upon you ABC analysis of inventory
- 33:50management you can use U you can utilize
- 33:53the same approach here as well 020 rule
- 33:56again we have implemented you can see
- 33:58that then we need to tailor the supplyer
- 34:01relationship management strategies based
- 34:03on segmentation which is more important
- 34:06strategic suppliers who are high profit
- 34:09High Supply risk that means you need to
- 34:12develop that Advantage competitive
- 34:15Advantage with those suppliers right and
- 34:18you need to work with those suppliers
- 34:19because risk High Supply risk lver
- 34:23suppliers already we defined who are
- 34:25leverage suppliers High profit low low
- 34:28Supply risk right that means there you
- 34:31should Target about efficiency because
- 34:35Supply is almost continuous when it is
- 34:37certain situation we talked about in
- 34:40setting the Strategic fit that we should
- 34:42be efficient bottleneck suppliers low
- 34:45profit High Supply risk profit is very
- 34:48less but
- 34:50Supply challenging right so how you can
- 34:53maintain the Safety stock so then you
- 34:56need to go for that maintaining the
- 34:58inventory that will carry cost
- 34:59non-critical supplier no profit no
- 35:02Supply risk so there also you can
- 35:04Implement as transaction management if
- 35:07you see all the products coming from
- 35:09maruti Suzuki are not equally demanded
- 35:12right so then how what you will do with
- 35:14the low profit but still the partner who
- 35:16are supplying
- 35:19maybe uh if we'll talk about maruti
- 35:21Suzuki SX4 was not that much successful
- 35:25but still partners are there who are
- 35:27supplying component for SX4 if you talk
- 35:30about maruti Vitara Mara Grand Vitara
- 35:33Swift desire so highest unit they have
- 35:37sold or Alto how you can forget Alto or
- 35:40maruti
- 35:41800 at that time every other vehicle was
- 35:45a maruti 800 right so that situation is
- 35:48also there let's talk about quickly
- 35:50Global sourcing when we are talking
- 35:52about developing vendor overseas and you
- 35:54know why we are going overseas either we
- 35:56are getting enhanced features quality
- 36:00reduced price right so then we are going
- 36:03for uh overseas vendors so we need to
- 36:06identify evaluate and against suppliers
- 36:08from different countries again only
- 36:12thing is whether you can Implement just
- 36:14in time with those or not but you cannot
- 36:16completely shift to overseas vendors
- 36:18first is cost obviously one dimension or
- 36:21Outsourcing means cost is first main
- 36:24Criterion you will evaluate quality what
- 36:26quality level he is Supply
- 36:28obviously if you are going overseas one
- 36:30very basic purpose is you are getting
- 36:32access to latest technology latest
- 36:34technology means enhanced version
- 36:37enhanced features enhanced quality
- 36:40corporate social responsibility if you
- 36:42in that way you are very very sincere
- 36:44about that how your suppliers is
- 36:46ensuring risk will be higher overseas
- 36:49whenever political scenario will change
- 36:51whenever any disaster will happen any
- 36:54dispute War like Russia Ukraine is going
- 36:57on since last 2 years right other
- 36:59countries are also participating what
- 37:02when will happen you can never predict
- 37:04those challenges risk are always there
- 37:07political disruptions anything goes
- 37:09wrong how the scenario will change right
- 37:12and then the infrastructure local
- 37:14context also you will evaluate right
- 37:16with the overseas
- 37:19vendors so this is very interesting uh
- 37:22case study of Colorado manufacturer so
- 37:25they are actually uh producing the
- 37:27Machine Products right so you can see
- 37:30Machine products are high in quantity
- 37:32and uh uh required Special Operations
- 37:35when they are producing used in almost
- 37:37all the equipments you are using at home
- 37:39at garage or maybe in the vehicles also
- 37:42so they were you uh manufacturing that
- 37:44so uh they experienced fluctuating
- 37:47fortunes until
- 37:4919990 but then the product demand served
- 37:53right but this increase in demand led to
- 37:57the expansion obviously company will
- 37:59expand size product offerings right but
- 38:02when one company was growing in that
- 38:05other competitors were attracted towards
- 38:07that so because com Colorado the main uh
- 38:13thing was they were building to order
- 38:17once they were getting the order then
- 38:18they were start manufacturing right so
- 38:21that means high lead time was one thing
- 38:24they were suffering a lot and and their
- 38:28market share erode due to this shorter
- 38:31lead time and lower cost of the
- 38:34competitive products now competitors
- 38:37they tapped this parameter that their
- 38:39lead time is very high let us produce
- 38:42quickly and capture the market so this
- 38:44is how they started dropping their
- 38:47market share and again another reason
- 38:49was outdated uh material resource
- 38:52planning system and you can see uh $1
- 38:56million excess inventory and went
- 38:59obsolete huge cost huge cost is there
- 39:03right then average lead time which I was
- 39:05talking about was 12 week almost double
- 39:08than the competitors so you can just
- 39:10imagine in this era if you are saying 12
- 39:13weeks uh you know uh lead time so there
- 39:17is uh you know uh Justin Time system
- 39:20where is minimizing the inventory all
- 39:22those things right so then overall
- 39:26scenario started changing their
- 39:27competitors started you know acquiring
- 39:29their position so then the new president
- 39:33joined and he was expert in implementing
- 39:35lean manufacturing Supply management
- 39:37practices and he developed one strategy
- 39:40for 3 to 5 years and the main purpose
- 39:42was how they can globally implement this
- 39:45system of implementing lean right how
- 39:48they can evap their this Supply Chain
- 39:51management you know uh platform right
- 39:54and they can minimize the total cost and
- 39:56as well as lead lead time the main
- 39:58function here was lead time and then
- 40:00they were lacking in house strategic
- 40:02sourcing if you are not producing inh
- 40:04house so that means majorly you are
- 40:06depending outside outside means lead
- 40:09time will be higher your dependency on
- 40:11others so then he prepared one cross
- 40:14functional team including all the uh
- 40:16different experts from all the team
- 40:18purchasing Marketing sales uh R&D
- 40:21manufacturing so that he can have the
- 40:24overall uh comprehensive View so they
- 40:27defined strategic objective obviously
- 40:30reducing lead time and at least they
- 40:32want to reduce 80% 2 weeks should be
- 40:35there right because their competitors
- 40:38were producing delivering in five to 6
- 40:40weeks so they wanted to reduce this they
- 40:43specified what are the critical parts
- 40:46and those critical Parts due to which
- 40:48the total Supply is interrupted In the
- 40:51End Market can we find some local
- 40:54players for that if we'll find local for
- 40:57the critical parts noncritical parts we
- 41:00can invent inventor eyesee and we can
- 41:03maintain the inventory then they
- 41:05assessed and select qualified suppliers
- 41:07only who can you know uh go for that
- 41:12agreement they can deliver quality
- 41:15quantity price right and then supplier
- 41:18selection and part allocation was done
- 41:21they Consolidated large number of
- 41:23supplier into smaller parts and they fed
- 41:26them large order but only only thing was
- 41:29only promise they took from their
- 41:31vendors you need to reduce the lead time
- 41:34maintain the quality and minimize the
- 41:36price efficiency they awarded those
- 41:39players Consolidated which I already
- 41:41talked about right so then they
- 41:45Implement Canan quantities now they
- 41:48implemented Canan production system with
- 41:50the vendors that means they designed bin
- 41:54depending upon the requirement of that
- 41:56particular component and then they
- 41:59decided depending upon the forecasting
- 42:01depending upon their manufacturing
- 42:03requirement they uh Place different
- 42:05types of bins right and then they ask
- 42:08their vendors to you know replenish
- 42:09those bins as per the required quantity
- 42:12so can quantities they went for they
- 42:15tracked the results and made the
- 42:16adjustment if any required and quickly
- 42:18we can go through the results marvelous
- 42:21results decreased from 6 to 8 weeks to
- 42:25only 2 days lead time
- 42:27and because you have reduced the lead
- 42:29time obviously ontime delivery increased
- 42:32from 50% to 95% you are now on time and
- 42:36quality is also improved nearby vendors
- 42:39supplying quality with latest technology
- 42:43price stability 30% inventory dropped by
- 42:4650% because earlier you were storing
- 42:49products for 6 s weeks because it was
- 42:51taking uh 6 seven weeks to replen the
- 42:54inventory so that much cash you were
- 42:56taking in hand so they implemented this
- 42:58lean concept and these are some of the
- 43:02uh you can see supplier on time delivery
- 43:05is 95% more than that this is how they
- 43:09achieved so uh this is a beautiful case
- 43:13study we have seen supplier relationship
- 43:15management how we can develop the
- 43:17suppliers and then we need to develop
- 43:19long-term relationship not at the arm
- 43:22length we need to keep them very near to
- 43:24us we need to segment all the suppliers
- 43:27group into different categories how they
- 43:29are producing how they are you know uh
- 43:32EV uh contributing towards the total
- 43:34profit uh the uh risk in the Supply
- 43:38right and then we talked about the
- 43:40global sourcing can be very important
- 43:43access to uh new suppliers and we talked
- 43:47about Outsourcing how we can do
- 43:49Outsourcing we can be more efficient and
- 43:51we can improve the overall quality of
- 43:54the value chain so these are the
- 43:56reference you can go for further reading
- 43:59that's all thank you very much
About this transcript
This page contains the full transcript of Lecture 37 : Strategic Sourcing by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 6,480 words across 1,006 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.