Lecture 37 : Strategic Sourcing — Transcript

by NPTEL IIT Kharagpur · 6,480 words · 1,006 segments · language en · Watch on YouTube

Full transcript

  1. 0:01[Music]
  2. 0:22[Music]
  3. 0:26hello dear students welcome back to nptl
  4. 0:29online course on Logistics and Supply
  5. 0:30Chain management so in the last session
  6. 0:33we decided that what are the things or
  7. 0:35the functional area we need to inhouse
  8. 0:38and what are the things we need to
  9. 0:41produce or Outsource to some third party
  10. 0:45right so that decision we have made so
  11. 0:48throughout the complete value chain that
  12. 0:50supply chain what are the activities we
  13. 0:53have decided that we'll go for
  14. 0:54outsourcing so once you have decided to
  15. 0:57go for outsourcing then there comes the
  16. 0:59concept of strategic sourcing because
  17. 1:02why we are calling strategic sourcing
  18. 1:04because it involves long-term investment
  19. 1:07of the resources so you cannot change
  20. 1:10your vendors your sources your
  21. 1:13stakeholders overnight right so and also
  22. 1:17if maybe one or two vendors are
  23. 1:19struggling with something quality price
  24. 1:22delivery so even then you don't want to
  25. 1:25delete those suppliers right from your
  26. 1:27list because every supplier is equally
  27. 1:31important maybe you got cheaper vendors
  28. 1:34or suppliers quality wise also overseas
  29. 1:37right but what if something goes wrong
  30. 1:41and that overseas supplies is
  31. 1:43interrupted then you need to depend on
  32. 1:45the local vendor maybe the cost you are
  33. 1:48saving by deploying the overseas vendors
  34. 1:51maybe that you can save by deing maybe
  35. 1:54just in time with the local vendor right
  36. 1:57so these are some of the pros and cons
  37. 2:00so that's why this is strategic sourcing
  38. 2:02once we have decided we'll go for
  39. 2:04sourcing what are the key elements we
  40. 2:06need to decide for getting those
  41. 2:08strategic sourcing Partners right we'll
  42. 2:11talk about supplier selection now what
  43. 2:15are the different options available and
  44. 2:17we'll evaluate those options we'll
  45. 2:19maintain the relationship under supplier
  46. 2:22relationship management and then we'll
  47. 2:25identify we'll categorize different
  48. 2:28suppliers as per their role their
  49. 2:30importance we'll talk it in the supplier
  50. 2:33segmentation and then we'll talk about
  51. 2:35the global sourcing as well some aspects
  52. 2:38of that and we'll end this discussion
  53. 2:40with one case study so strategic
  54. 2:43sourcing is identification evaluation
  55. 2:47and selection of suppliers once you
  56. 2:50decided we'll
  57. 2:51Outsource the sub assembly part
  58. 2:54Transportation part or warehousing let
  59. 2:57us find out how many uh players are
  60. 3:00there in the market we'll identify we'll
  61. 3:03evaluate as per our criteria whatever
  62. 3:05criteria we have set it's not only we
  63. 3:08will focus on lowcost supplier it's the
  64. 3:12purpose very purpose here is strong
  65. 3:14relationship improve quality delivery
  66. 3:17performance reduce cost and mitigate
  67. 3:20risk sometime you'll get the cheaper
  68. 3:22supplier but you are always struggling
  69. 3:24with getting the right quality sometime
  70. 3:28maybe you are getting the cheap material
  71. 3:30may be fair quality that delivery person
  72. 3:33is uh or your raw material supplier is
  73. 3:36always struggling with the
  74. 3:38Dy what if there is any uncertainty in
  75. 3:42the market how you will share the uh
  76. 3:44risk of uncertainty with the raw
  77. 3:46material supplier but raw material
  78. 3:48supplier the he is saying that I'll
  79. 3:51produce whatever you have ordered now if
  80. 3:53you'll ask me to change to some other
  81. 3:55pattern other design other material so
  82. 3:58you will pay for this whatever I have
  83. 3:59have developed the infrastructure here
  84. 4:02whatever the raw material machines I
  85. 4:04have acquired right so what are the
  86. 4:08factors like product and process
  87. 4:11specifications what you are developing
  88. 4:13right what are the available suppliers
  89. 4:16in the market and customer service to
  90. 4:19determine the feasibility of sourcing
  91. 4:21materials locally or globally we'll talk
  92. 4:23about in detail in global sourcing right
  93. 4:26when we'll talk about the uh developing
  94. 4:29your vendors overseas right so uh this
  95. 4:32includes the development of sourcing
  96. 4:34strategy negotiating contracts
  97. 4:37establishing partner relationship now
  98. 4:39negotiating contracts uh other than your
  99. 4:43delivery quality price those are there
  100. 4:45in your negotiation terms and conditions
  101. 4:48but then if something goes wrong if any
  102. 4:52dispute is there where you will handle
  103. 4:54how you will handle right that also you
  104. 4:56need to Define if you have uh if you you
  105. 5:00have accepted the vendor lot as per the
  106. 5:03quality quantity in how many days you
  107. 5:06are going to make the payment that
  108. 5:08payment terms also you need to Define in
  109. 5:10the negotiate terms how you will be
  110. 5:12making payments in installments or how
  111. 5:14you will how you will be you know
  112. 5:17allocating orders you asked me as a
  113. 5:19vendor you asked me to you know develop
  114. 5:21this much infrastructure but now you are
  115. 5:24diverting your whole order to some other
  116. 5:26vendor right I'm not getting those
  117. 5:28orders to
  118. 5:30reach at minimum qar you know quantity
  119. 5:34where I can be at the profit table
  120. 5:36position right so that breakable point
  121. 5:39I'm not able to reach so that you need
  122. 5:41to ensure so some characteristics of
  123. 5:44strategic sourcing this is disciplined
  124. 5:46buying process repetitive process it is
  125. 5:49not one-time process so maybe in one
  126. 5:52month depending upon the product and
  127. 5:54depending upon the components you are
  128. 5:55supplying maybe you are supplying five
  129. 5:57Lots 10 Lots or maybe 15 losss if that
  130. 6:01is high valued product because that much
  131. 6:03inventory I cannot keep right depending
  132. 6:06upon size also depending upon the
  133. 6:08product features characteristics also it
  134. 6:10depends upon how many repetitive uh
  135. 6:13procurements or purchasing you are doing
  136. 6:16right total cost Factor so total cost
  137. 6:20factor is not only the cost of the raw
  138. 6:22material it's the cost of acquiring the
  139. 6:25material right so that cost is if you
  140. 6:28are ensuring the quality quality will
  141. 6:30also take some cost Service delivery and
  142. 6:33other than delivery after sales services
  143. 6:36to maintain that relationship means
  144. 6:38total cost with one vendor if you have
  145. 6:41appointed one person to T or tap five
  146. 6:45vendors to you know negotiate with them
  147. 6:47to you know track the orders to raise
  148. 6:50the purchase order so that person cost
  149. 6:52is also included in that right
  150. 6:55Consolidated purchasing power that again
  151. 6:59strategic sourcing when you are going
  152. 7:00for you can leverage on high volumes
  153. 7:03right but then again if you are
  154. 7:05producing higher what actually is
  155. 7:07required so that means you are creating
  156. 7:09inventory so that inventory cost holding
  157. 7:11cost is good enough to go for or uh you
  158. 7:16want to leverage on the high value that
  159. 7:18is tradeoff you will make right tight
  160. 7:21supplier relationship it is up to you
  161. 7:24whether you are keeping your
  162. 7:26relationships or your vendors arms
  163. 7:28length away or you are keeping just
  164. 7:31shoulder length away how closely you are
  165. 7:33working with the having said that arms
  166. 7:35length away means that means your uh
  167. 7:40those strategic Partners Outsourcing
  168. 7:43partners are not your you know complete
  169. 7:45stakeholders of your value chain right
  170. 7:49so that relationship you need to Define
  171. 7:52that depends also what type of product
  172. 7:54you are buying whether very close
  173. 7:56relationship is required whether you
  174. 7:58need to set up you some sometimes you
  175. 7:59are asking your vendors to set up their
  176. 8:02facilities near to your production house
  177. 8:04so that just in time can also be ensured
  178. 8:07but whether that vendor is ready to set
  179. 8:09up he will be ready when you will ensure
  180. 8:12that we will feed you large orders and
  181. 8:15that break even point you can reach
  182. 8:18right where after that break even point
  183. 8:20you will start producing profit improved
  184. 8:22tream work and purchasing
  185. 8:25skills so now teamwork means whenever
  186. 8:29you are going for negotiation you are
  187. 8:31going for outsourcing it's not only one
  188. 8:33person game that one person is
  189. 8:35developing the Outsourcing Partners all
  190. 8:37the person from different department
  191. 8:39Logistics operation marketing accounting
  192. 8:42purchasing store department so that all
  193. 8:45the possibilities you can record all the
  194. 8:48terms condition can be included in
  195. 8:51the that negotiation uh legal document
  196. 8:55right so if only one person is
  197. 8:58representing all the the functional
  198. 9:00units maybe the person can miss that
  199. 9:02right so this is teamwork realigning
  200. 9:06business processes now you need to
  201. 9:09realign or reevaluate your business
  202. 9:11processes right and your business
  203. 9:14processes with your strategic sourcing
  204. 9:17Partners right if you have aligned
  205. 9:20properly quick information sharing is
  206. 9:22there transer transparent information
  207. 9:24sharing is there that means that placing
  208. 9:27order waiting for the order then
  209. 9:30tracking the order then you know always
  210. 9:32you are after the vendor where is the
  211. 9:34raw material where is the lot so then
  212. 9:37that cost can be minimized lead cycle
  213. 9:40time can be reduced inventory cost can
  214. 9:42be reduced because whenever you are
  215. 9:45requiring the material your raw material
  216. 9:47supplier is feeding you that material
  217. 9:49why you will maintain the inventory
  218. 9:51continuous Improvement will be there
  219. 9:53when uh you will be setting up the key
  220. 9:56performance indicators for your vendors
  221. 9:59for yourself as well so I have seen some
  222. 10:01of the manufacturers like if I have
  223. 10:03worked with the a India limited I have
  224. 10:06worked with the phlips uh manufacturing
  225. 10:09coakers as well so basic point I'll tell
  226. 10:13you here continuous Improvement what
  227. 10:15Phillips is doing they are asking all
  228. 10:18the vendors to generate the quality
  229. 10:20report of all the components they are
  230. 10:22supplying right so that means whenever
  231. 10:25I'll receive any lot they will send me
  232. 10:27the quality report of that lot
  233. 10:30quality report means all the checks will
  234. 10:31be there in the next session we'll talk
  235. 10:33about the vendor rating where we'll see
  236. 10:35what are the different parameters all
  237. 10:37the dimensions you want to check you
  238. 10:39want to check aesthetically the position
  239. 10:43of the product right so Those comp uh
  240. 10:45already you have given uh vendors the
  241. 10:48checklist that whenever you are sending
  242. 10:50lot based on certain sampling you need
  243. 10:52to ensure that right this is what
  244. 10:54Philips is doing and when the product
  245. 10:57lot is reaching to the man manfacturing
  246. 10:59unit again their incoming quality
  247. 11:02control is checking the quality again it
  248. 11:04is checked in the process again it is
  249. 11:07checked when the final product is ready
  250. 11:09in the outgoing Quality Control
  251. 11:11Department so this is how not only the
  252. 11:14manufacturing unit you are focusing to
  253. 11:16improve the quality you are focusing to
  254. 11:18improve through your vendors also who
  255. 11:21are providing the raw material right
  256. 11:23focus on value creation this very basic
  257. 11:27example I quoted how you can create
  258. 11:29value by ensuring the quality at
  259. 11:31different stages and will help you to
  260. 11:34you know uh develop the loyal customers
  261. 11:36and will satisfy customer right next is
  262. 11:39supplier selection and management
  263. 11:42so uh now you have identified all the
  264. 11:46potential Alternatives available in
  265. 11:48terms of number of vendors and suppliers
  266. 11:50now you will go for selection and then
  267. 11:52we'll talk about supplier relationship
  268. 11:53management so you'll talk about
  269. 11:55importance of
  270. 11:56supplier depending upon
  271. 11:59uh there may be some factors like unit
  272. 12:03cost right reducing the total cost of
  273. 12:05acquisition meeting customer requirement
  274. 12:07relying on few suppliers and depending
  275. 12:10on supplier for Designing importance of
  276. 12:12supplier we can find out we can
  277. 12:15categorize as per the component he is
  278. 12:17supplying there are two ways how you can
  279. 12:19find out one is
  280. 12:21quantity another one is your
  281. 12:26quality so so depending upon
  282. 12:29the quality of the product sometimes the
  283. 12:32product quality Fair quality will also
  284. 12:35work right because that component is not
  285. 12:38very very important in that functioning
  286. 12:40of the product right so that if let's
  287. 12:43say uh you are manufacturing AC so in
  288. 12:47inside AC whatever binding you are using
  289. 12:50whatever machine you are using very very
  290. 12:53important right cooling unit you are
  291. 12:55using very very important PCB you are
  292. 12:57inserting inside to control the
  293. 12:59programming of the AC is very very
  294. 13:00important remote you are using is very
  295. 13:03very important but what about the outer
  296. 13:06casing plastic casing you are using so
  297. 13:10even if you are somewhere compromising
  298. 13:12with the qual because once it is hanged
  299. 13:14so as long as you are not touching you
  300. 13:16are not dropping so that much hardness
  301. 13:19or quality is not required so there
  302. 13:21maybe you can so then you can based on
  303. 13:23quality you can distinguish based on
  304. 13:26quantity how much you are buying from
  305. 13:28that particular particular vendor we'll
  306. 13:29see in Vendor segmentation in detail
  307. 13:32right supplier relationship already I
  308. 13:35talked about whether you are keeping at
  309. 13:36arms length or you are keeping at very
  310. 13:39near to you that depends upon you
  311. 13:41supplier selection criteria so now
  312. 13:44quality delivery performance history
  313. 13:47warranties claim policies production
  314. 13:49facility capacity their potential their
  315. 13:52technical potential their SK human
  316. 13:54skills right their scale up scale down
  317. 13:57capabilities their financial position
  318. 14:00industrial relations how they are
  319. 14:02dealing with other vendors so many
  320. 14:05things you can record once when you are
  321. 14:07going for supplier selection once
  322. 14:10supplier is selected some of the
  323. 14:13parameters are obsolete history is gone
  324. 14:17how he is dealing with other vendor is
  325. 14:19gone their financial position may be may
  326. 14:21not be very important then you will keep
  327. 14:23track of what quality he is delivering
  328. 14:25once it is selected quality is
  329. 14:27delivering Price He is giv
  330. 14:29delivery performance these three are the
  331. 14:32major there are certain parameter but
  332. 14:34the three will take the maximum share as
  333. 14:38long as your vendor is doing fairly well
  334. 14:41on these three you will still you can
  335. 14:44carry with that cost supplier evaluation
  336. 14:47so continuous evaluation will be there
  337. 14:50that is one thing when you are receiving
  338. 14:52the Lots you are providing the
  339. 14:53evaluation feedback right how the lot is
  340. 14:56doing right so but the another very
  341. 14:59basic point it's not only to you know
  342. 15:01select or reject uh the lot of the
  343. 15:04vendor to improve the quality of the raw
  344. 15:07material you are getting from the vendor
  345. 15:09is also your shared responsibility right
  346. 15:12so if vendor is not doing well with
  347. 15:15certain parameters you need to develop
  348. 15:17those vendors for those parameters right
  349. 15:20so that is also your Define will how
  350. 15:22closely you are working with your
  351. 15:24vendors your relationship supplier
  352. 15:26certification let us
  353. 15:27say my manufacturing unit says that we
  354. 15:30are always environmental conscious we
  355. 15:32are always quality conscious three main
  356. 15:34features environmental conscious we are
  357. 15:38quality Top Class quality we are
  358. 15:40providing to our customers and work
  359. 15:44heising work safety hyene
  360. 15:48parameters our employees these three are
  361. 15:51major concern and I am as a vendor
  362. 15:53approaching to you I'm saying sir we are
  363. 15:57ISO
  364. 15:599,1
  365. 16:01certified that is for Quality we are ISO
  366. 16:0514,1 certified we are 45,1 certified so
  367. 16:11that means if you are ISO certified that
  368. 16:15is fair enough for me because you are
  369. 16:17maintaining all the records you are
  370. 16:18taking care of all those measures very
  371. 16:20easy for me to make the
  372. 16:22decision then supplier management once
  373. 16:25it is done how you will manage the
  374. 16:27supplier how you'll help them to improve
  375. 16:29the performance to monitor the
  376. 16:31performance and if any issues are there
  377. 16:33let's say if they will upgrade their
  378. 16:36technology there will be Improvement but
  379. 16:38upgrading the technology they don't have
  380. 16:40those financial you know resources so
  381. 16:43how you can help them benefits of
  382. 16:45strategic sourcing already we talked
  383. 16:47about if you have those close
  384. 16:49relationship strategic sourcing how you
  385. 16:51it can impact your business performance
  386. 16:54now we'll talk about supplier
  387. 16:56relationship
  388. 16:57management once suppliers now vendor
  389. 17:00selection is done for one component we
  390. 17:03have now decided that we'll go for
  391. 17:06vendor 1 vendor two vendor three vendor
  392. 17:09four four vendors we are maintaining for
  393. 17:11this particular component right now how
  394. 17:13we'll manage the relationship with these
  395. 17:16font vendors and it is also there that
  396. 17:18all four vendors are not giving you
  397. 17:20equal quality equal price equal delivery
  398. 17:23time schedule right equal contract terms
  399. 17:26different contract terms will be there
  400. 17:28some may be Prov giving you just in time
  401. 17:31some may be asking you to hold the
  402. 17:32inventory depending upon overseas vendor
  403. 17:35some are very good with the quality so
  404. 17:37how you will collaborate that
  405. 17:39collaboration will decide the mutual
  406. 17:42beneficial relationship both for both
  407. 17:44right so that will only happen if you
  408. 17:47have trust open communication and it's
  409. 17:50not only as a manufacturer I'm
  410. 17:52maximizing my profit I should ensure
  411. 17:56that my customer profit is also Max
  412. 17:58maximized right and then if it is so we
  413. 18:03can share the risk we can mitigate the
  414. 18:05risk and we can have the access to the
  415. 18:08resources of the other organization like
  416. 18:11technology like skills we can use that
  417. 18:13right so this involves supplier
  418. 18:16selection contract negotiation
  419. 18:18performance measurement joint planning
  420. 18:20and risk management
  421. 18:22right so to establish supplier
  422. 18:25relationship management first is you
  423. 18:26need to define the supplier relation uh
  424. 18:29relationship management right
  425. 18:31relationship management means that
  426. 18:33should align your strategy very basic
  427. 18:36example I'll code here let's say as a
  428. 18:39manufacturer I want to take risk but my
  429. 18:42supplier wants to play in a safe
  430. 18:45environment so what I'm doing as risk
  431. 18:48taking player I'm doing you know
  432. 18:50Innovation and then coming with a new
  433. 18:52product new features so quickly asking
  434. 18:54my supplier to change the design of the
  435. 18:56raw material whether he is is ready to
  436. 18:59do that because he wants to deal with
  437. 19:01those products items where the you know
  438. 19:04saturated kind of demand is there so I
  439. 19:07need to align the strategy key identify
  440. 19:11key suppliers out of those suppliers now
  441. 19:13who are going with our strategy or who
  442. 19:16are ready to changee their strategy as
  443. 19:18per our strategy we need to pick those
  444. 19:20we need to identify those suppliers then
  445. 19:23we need to assess their capabilities now
  446. 19:25they are ready to change the design the
  447. 19:28change the the process the change the
  448. 19:29quality parameters their Dimensions
  449. 19:32whatever product or component they are
  450. 19:35providing we need to assess the
  451. 19:38capabilities maybe you can ask their
  452. 19:40capacity their turnover their Market
  453. 19:43expansion strategies their Manpower
  454. 19:45skills their technical skills how
  455. 19:47frequently they are renovating so those
  456. 19:49capabilities you need to analyze
  457. 19:52establish governance structure right so
  458. 19:55now you need to define the roles
  459. 19:57responsibilities and decision- making
  460. 19:58process right let's say the example we
  461. 20:01talked about when we was talking about
  462. 20:03you know that uh how we can handle the
  463. 20:06uncertainty and sometime what we were
  464. 20:08saying that as a retailer our retailer
  465. 20:11is absorbing the maximum uncertainty
  466. 20:14manufacturer and raw material suppliers
  467. 20:16are not handling the uncertainty so they
  468. 20:19should be most efficient our retailer
  469. 20:22should be most responsive because he
  470. 20:25needs to meet all the orders so then
  471. 20:28margin should be be higher with the
  472. 20:30retailer not with the manufacturer and
  473. 20:31suppliers so that governance you need to
  474. 20:35uh set the proper rules right then
  475. 20:38supplier collaboration
  476. 20:40initiatives if supplier is lacking
  477. 20:42somewhere with the technology and he
  478. 20:44wants to you know come up with you and
  479. 20:47wants to develop that technology how you
  480. 20:49can help your supplier invest in
  481. 20:51technology let let's say very small
  482. 20:53supplier cannot implement the supplier
  483. 20:56management software inventory management
  484. 20:58soft software we are talking about
  485. 20:59vendor managed inventory right
  486. 21:02warehousing softwares so but those
  487. 21:05softwares are very helpful we we have
  488. 21:07analyzed but that small vendor cannot
  489. 21:09analyze so how we can Implement those
  490. 21:11softwares uh at the vendor end and will
  491. 21:14get the you know profit for both right
  492. 21:17Foster open communication already we
  493. 21:19discussed about transparent open
  494. 21:21communication will help them to develop
  495. 21:23that trust to develop that relationship
  496. 21:26right Implement performance metric
  497. 21:29now kpis we have we we we are tracking
  498. 21:33the performance of individual those four
  499. 21:35suppliers we finalized and for each lot
  500. 21:38we are finalize uh we are tracking the
  501. 21:40performance of the lot against those uh
  502. 21:43parameters so then we can uh provide the
  503. 21:46feedback and how they can uh see if I am
  504. 21:49manufacturing unit I'm in charge of
  505. 21:52incoming quality control as I have
  506. 21:54worked as incoming quality control
  507. 21:55engineer with the every India limited
  508. 21:57right so what we were doing we were
  509. 22:00inspecting lot coming from different
  510. 22:02vendors and certain B sampling based
  511. 22:06right and if that lot is passed in the
  512. 22:08sampling we are passing the lot to the
  513. 22:10production or otherwise it is rejected
  514. 22:12complete lot rejected means will be
  515. 22:14shipped back to the vendor so it's not
  516. 22:18only the responsibility of the iqc there
  517. 22:21I have learned that so why don't our iqc
  518. 22:24team visit the vendor location and help
  519. 22:28them with setting up those parameters
  520. 22:30help them maybe with changing the design
  521. 22:32changing the equipment changing the
  522. 22:34technology let them understand what are
  523. 22:37our requirements why your lot is failing
  524. 22:39because just failing rejecting the lot
  525. 22:42will not help either the manufacturing
  526. 22:45unit or the vendor and then development
  527. 22:48programs this is what I was talking
  528. 22:49about why don't you conduct some uh
  529. 22:52vendor development programs so I have
  530. 22:54seen like L&T HS ABB so what they are
  531. 22:59doing for electrical they are coming
  532. 23:01with you know new new solutions for
  533. 23:03controlling the lighting system for
  534. 23:05controlling your Electrical Supply
  535. 23:08electrical equipment so what they are
  536. 23:10doing they have the close collaboration
  537. 23:13because they are not selling they are
  538. 23:14not having their own retail shop they
  539. 23:16are selling through different retailers
  540. 23:18for all those major retailers time to
  541. 23:21time they are organizing seminars where
  542. 23:23they are treating them very well and
  543. 23:26then they are educating them about the
  544. 23:28new products right so that means once
  545. 23:31you know all the features of the new
  546. 23:33products only as a marketing or sale
  547. 23:35team you can convince your customer that
  548. 23:37these are the new product coming from
  549. 23:39hav these are the new products how you
  550. 23:41can control from one point you can
  551. 23:44control the electricity of your whole
  552. 23:46house how you can install the smart
  553. 23:48electricity management system right so
  554. 23:52that that is the thing objective of
  555. 23:54supplier relationship management
  556. 23:56obviously if we'll talk about first two
  557. 23:58three will contribute about 70% 80/20
  558. 24:02rule of parto principle so you need to
  559. 24:05cover 20% of the items 80% objectives
  560. 24:09can be completed leverage on supplier
  561. 24:13capability so let's say Apple is very
  562. 24:16good with manufacturing but not with the
  563. 24:18distribution they are selling through
  564. 24:20online let us collaborate with United
  565. 24:22Parcel Services and then sell your
  566. 24:25product throughout the world right if
  567. 24:29you have doubled that image why don't
  568. 24:32you make it available for everyone when
  569. 24:34everyone knows about your product so
  570. 24:36then you can leverage UPS you can
  571. 24:39leverage DHL Services right cost
  572. 24:43reduction Target obviously apple is
  573. 24:45doing with China where they are reducing
  574. 24:47the cost now they are Outsourcing to
  575. 24:49India where they are reducing the
  576. 24:51production cost Phillips is not
  577. 24:53manufacturing their product they are
  578. 24:54Outsourcing to their manufact co-
  579. 24:56manufacturer reducing the manufacturing
  580. 24:58cost
  581. 24:58security of supply and then you can have
  582. 25:02multiple vendors some nearby vendors
  583. 25:04some overseas vendors so overseas
  584. 25:06vendors you can maintain quality and
  585. 25:08price with nearby vendors you can ensure
  586. 25:12the smooth Supply if anything goes wrong
  587. 25:14with some party the other can ensure the
  588. 25:17complete Supply so this you will become
  589. 25:20the customer of choice it's not that
  590. 25:22that you are picking some vendor uh
  591. 25:26forcefully that also happens when we
  592. 25:28have some Industries like uh if you are
  593. 25:31processing petrol or diesel crude oil is
  594. 25:34coming you have to buy only two three
  595. 25:36players are there right so then we don't
  596. 25:38have so many options so many other
  597. 25:40objectives are there you can see we can
  598. 25:42have sustainable relationship uh
  599. 25:44enhanced relationship we can have access
  600. 25:47to global market local market we can
  601. 25:49expand our boundaries price we can
  602. 25:51negotiate we can be more effective those
  603. 25:54all are objective of uh supplyer
  604. 25:57relationship management but how some are
  605. 26:00challenges which are posed when we are
  606. 26:02talking about Supply relationship
  607. 26:04management if you are too focused on
  608. 26:06cost only always you are talking about
  609. 26:08cost you are not talking about the
  610. 26:09delivery of the product you are not
  611. 26:11talking about the quality of the product
  612. 26:12you are not talking about the changing
  613. 26:14variety of the product innovation of the
  614. 26:16product so customer is now getting bored
  615. 26:20so quickly that your product life cycle
  616. 26:23which earlier was maybe for for for
  617. 26:25product for 5 years now it has red used
  618. 26:28to only 2 years and there is study
  619. 26:33saying that almost 70 to 80% of the
  620. 26:37smartphone users they are changing their
  621. 26:39mobile phone every 2 three years just
  622. 26:43imagine how much waste is one thing but
  623. 26:47why they are changing because new
  624. 26:48features are coming and still you are
  625. 26:50saying that cost is very important so
  626. 26:52that is one
  627. 26:54challenge when you don't have alliance
  628. 26:57with the strategic partner like I quoted
  629. 26:59the example you are risk taking as
  630. 27:01manufacturer but your supplier don't
  631. 27:03want to take risk so you have picked the
  632. 27:05wrong supplier strategic objectives
  633. 27:08again the same thing you want to be
  634. 27:10responsive but your supplier want to be
  635. 27:12cost efficient so that alignment should
  636. 27:14be there there is no open communication
  637. 27:17right so how you are negotiating how you
  638. 27:20are developing the legal negotiating
  639. 27:22documents right so how you are ensuring
  640. 27:25the uh win-win situation for for your
  641. 27:28vendor as well that you will feed them
  642. 27:30large order how Walmart is doing that
  643. 27:33how strategically he has outsourced you
  644. 27:35know with the vendors that they are
  645. 27:38getting the minimum cost products and
  646. 27:40then selling those product throughout
  647. 27:42the world right so largest retailer
  648. 27:46chain in the world it's not that easy to
  649. 27:49be right how you know uh aliwa became so
  650. 27:53big in China you just imagine taking 5%
  651. 27:58GDP of China so how how big they are you
  652. 28:02know uh becoming so then they are
  653. 28:05collaborating with the local partner as
  654. 28:07well they are collaborating with the uh
  655. 28:10uh those foreign players supplier
  656. 28:13segmentation now this is important to
  657. 28:16segment your supplier which supplier is
  658. 28:18most important right so then you will
  659. 28:22understand how you can segment this see
  660. 28:25there there are two things right one is
  661. 28:28is
  662. 28:29quantity another is price another ways
  663. 28:32how you can do that maybe quantity you
  664. 28:36are using in millions right for maybe
  665. 28:40let's say Quantity you are using 50,000
  666. 28:43items but price is only let's say
  667. 28:485,000 but other hand you are using only
  668. 28:51200 pieces price is
  669. 28:5650,000 right so that means these are two
  670. 28:59parameters how you can segment the
  671. 29:01suppliers from one supplier may be very
  672. 29:04important because huge quantity he is
  673. 29:06supplying another supplier very
  674. 29:08important because he's not supplying
  675. 29:10huge quantity less quantity but
  676. 29:13valuable parts right if we'll talk about
  677. 29:15automobile industry engine is something
  678. 29:18very very important very very you know
  679. 29:22uh highly priced so the value is there
  680. 29:26but if you talk about uh
  681. 29:28many screws you are using many machines
  682. 29:30part you are using quantity is huge
  683. 29:33right but the value is less soic Matrix
  684. 29:38is there to Define our uh uh suppliers
  685. 29:42into four different categories strategic
  686. 29:44suppliers these are those suppliers
  687. 29:46which are adding high value to your
  688. 29:49profit but risk is also very high with
  689. 29:52those uh suppliers right High supplier
  690. 29:56risk is there leverage supplier they are
  691. 29:59helping you to get the high profit but
  692. 30:01Supply risk is always very less so these
  693. 30:04are suppliers where you can leverage
  694. 30:06right profit is very high but Supply is
  695. 30:08constant they are ensuring what next
  696. 30:10suppliers low profit High Supply you
  697. 30:13need to think about these because not
  698. 30:15adding much value to your profit but and
  699. 30:17then challenging right noncritical
  700. 30:20suppliers low profit low Supply risk
  701. 30:22this is one way how you can categorize
  702. 30:24your suppliers right so criteria for
  703. 30:28supplier segmentation how much you are
  704. 30:31spending on particular supplier if you
  705. 30:32are spending 80% of your budget on one
  706. 30:35or maybe two suppliers why don't you
  707. 30:37negotiate for higher price right why
  708. 30:40don't you go for lower cost right so if
  709. 30:43you are spending only 20% so then there
  710. 30:46is no point of you know negotiating on
  711. 30:48that risk how much your supplier is
  712. 30:51taking the risk if he is bearing more
  713. 30:54risk obviously you need to compensate
  714. 30:58the supplier criticality of the
  715. 31:00component some components are like ACI I
  716. 31:03told you not very critical related to
  717. 31:05safety related to functionality so then
  718. 31:08way that way you can still compromise
  719. 31:11with the quality ask him to reduce the
  720. 31:13price but if it is the key component The
  721. 31:16Binding copper Bing you are using
  722. 31:18aluminium winding you are using inside
  723. 31:20the AC right the PCB you are using to
  724. 31:23control so then those are very critical
  725. 31:26performance you this this is another
  726. 31:28based on performance performance you can
  727. 31:31record on quality performance you can
  728. 31:33record how quickly he is revising the
  729. 31:35prices price performance and then
  730. 31:38delivery performance are three major
  731. 31:39things always I'm talking about you are
  732. 31:42evaluating any supplier once supplier is
  733. 31:44fixed
  734. 31:46right majorly three things but there are
  735. 31:48so many other things like industrial
  736. 31:50relations negotiations how you are
  737. 31:52settling the issues with that supplier
  738. 31:55Market position of that supplier whether
  739. 31:57that supplier is known for the
  740. 31:59industrial relations known for the
  741. 32:02delivery whatever he is delivering in
  742. 32:03the market and geographic location very
  743. 32:06near can be very effective because we'll
  744. 32:08reduce the lead TI will help us to
  745. 32:10implement just in time will help us to
  746. 32:13reduce the inventory but if it is
  747. 32:15overseas vendor will help us to increase
  748. 32:19the quality will help us to reduce the
  749. 32:22price but will not Implement justtin die
  750. 32:25will not Implement that inventory zero
  751. 32:28inventory policies there is another
  752. 32:30analysis of ABC analysis how you can
  753. 32:34segregate based on quantity how much
  754. 32:36value they are covering small number of
  755. 32:39suppliers but they are contributing
  756. 32:42majorly right so maybe those suppliers
  757. 32:46only 10 to
  758. 32:4820% and they are taking almost 70% of
  759. 32:54the value engines you are uh using tires
  760. 32:58you are using right so the chess you are
  761. 33:01using right the steel body you are using
  762. 33:03maybe 20% of the suppliers carrying the
  763. 33:0670% of the cost then these are modulate
  764. 33:09suppliers these may be 30% suppliers
  765. 33:13right so they are spending maybe average
  766. 33:16spending right again maybe
  767. 33:2020% Then large number of suppliers maybe
  768. 33:23another rest 50% 40 to 50% of the
  769. 33:26suppliers but only contributing 10% in
  770. 33:29the total volume this I'm talking about
  771. 33:32in terms of the price they are charging
  772. 33:34economic or maybe you can also divide
  773. 33:37this in terms of quantity but price is
  774. 33:40maybe screw they are giving you screw
  775. 33:43but cost is very less right so but
  776. 33:46quantity is very high so that is depends
  777. 33:48upon you ABC analysis of inventory
  778. 33:50management you can use U you can utilize
  779. 33:53the same approach here as well 020 rule
  780. 33:56again we have implemented you can see
  781. 33:58that then we need to tailor the supplyer
  782. 34:01relationship management strategies based
  783. 34:03on segmentation which is more important
  784. 34:06strategic suppliers who are high profit
  785. 34:09High Supply risk that means you need to
  786. 34:12develop that Advantage competitive
  787. 34:15Advantage with those suppliers right and
  788. 34:18you need to work with those suppliers
  789. 34:19because risk High Supply risk lver
  790. 34:23suppliers already we defined who are
  791. 34:25leverage suppliers High profit low low
  792. 34:28Supply risk right that means there you
  793. 34:31should Target about efficiency because
  794. 34:35Supply is almost continuous when it is
  795. 34:37certain situation we talked about in
  796. 34:40setting the Strategic fit that we should
  797. 34:42be efficient bottleneck suppliers low
  798. 34:45profit High Supply risk profit is very
  799. 34:48less but
  800. 34:50Supply challenging right so how you can
  801. 34:53maintain the Safety stock so then you
  802. 34:56need to go for that maintaining the
  803. 34:58inventory that will carry cost
  804. 34:59non-critical supplier no profit no
  805. 35:02Supply risk so there also you can
  806. 35:04Implement as transaction management if
  807. 35:07you see all the products coming from
  808. 35:09maruti Suzuki are not equally demanded
  809. 35:12right so then how what you will do with
  810. 35:14the low profit but still the partner who
  811. 35:16are supplying
  812. 35:19maybe uh if we'll talk about maruti
  813. 35:21Suzuki SX4 was not that much successful
  814. 35:25but still partners are there who are
  815. 35:27supplying component for SX4 if you talk
  816. 35:30about maruti Vitara Mara Grand Vitara
  817. 35:33Swift desire so highest unit they have
  818. 35:37sold or Alto how you can forget Alto or
  819. 35:40maruti
  820. 35:41800 at that time every other vehicle was
  821. 35:45a maruti 800 right so that situation is
  822. 35:48also there let's talk about quickly
  823. 35:50Global sourcing when we are talking
  824. 35:52about developing vendor overseas and you
  825. 35:54know why we are going overseas either we
  826. 35:56are getting enhanced features quality
  827. 36:00reduced price right so then we are going
  828. 36:03for uh overseas vendors so we need to
  829. 36:06identify evaluate and against suppliers
  830. 36:08from different countries again only
  831. 36:12thing is whether you can Implement just
  832. 36:14in time with those or not but you cannot
  833. 36:16completely shift to overseas vendors
  834. 36:18first is cost obviously one dimension or
  835. 36:21Outsourcing means cost is first main
  836. 36:24Criterion you will evaluate quality what
  837. 36:26quality level he is Supply
  838. 36:28obviously if you are going overseas one
  839. 36:30very basic purpose is you are getting
  840. 36:32access to latest technology latest
  841. 36:34technology means enhanced version
  842. 36:37enhanced features enhanced quality
  843. 36:40corporate social responsibility if you
  844. 36:42in that way you are very very sincere
  845. 36:44about that how your suppliers is
  846. 36:46ensuring risk will be higher overseas
  847. 36:49whenever political scenario will change
  848. 36:51whenever any disaster will happen any
  849. 36:54dispute War like Russia Ukraine is going
  850. 36:57on since last 2 years right other
  851. 36:59countries are also participating what
  852. 37:02when will happen you can never predict
  853. 37:04those challenges risk are always there
  854. 37:07political disruptions anything goes
  855. 37:09wrong how the scenario will change right
  856. 37:12and then the infrastructure local
  857. 37:14context also you will evaluate right
  858. 37:16with the overseas
  859. 37:19vendors so this is very interesting uh
  860. 37:22case study of Colorado manufacturer so
  861. 37:25they are actually uh producing the
  862. 37:27Machine Products right so you can see
  863. 37:30Machine products are high in quantity
  864. 37:32and uh uh required Special Operations
  865. 37:35when they are producing used in almost
  866. 37:37all the equipments you are using at home
  867. 37:39at garage or maybe in the vehicles also
  868. 37:42so they were you uh manufacturing that
  869. 37:44so uh they experienced fluctuating
  870. 37:47fortunes until
  871. 37:4919990 but then the product demand served
  872. 37:53right but this increase in demand led to
  873. 37:57the expansion obviously company will
  874. 37:59expand size product offerings right but
  875. 38:02when one company was growing in that
  876. 38:05other competitors were attracted towards
  877. 38:07that so because com Colorado the main uh
  878. 38:13thing was they were building to order
  879. 38:17once they were getting the order then
  880. 38:18they were start manufacturing right so
  881. 38:21that means high lead time was one thing
  882. 38:24they were suffering a lot and and their
  883. 38:28market share erode due to this shorter
  884. 38:31lead time and lower cost of the
  885. 38:34competitive products now competitors
  886. 38:37they tapped this parameter that their
  887. 38:39lead time is very high let us produce
  888. 38:42quickly and capture the market so this
  889. 38:44is how they started dropping their
  890. 38:47market share and again another reason
  891. 38:49was outdated uh material resource
  892. 38:52planning system and you can see uh $1
  893. 38:56million excess inventory and went
  894. 38:59obsolete huge cost huge cost is there
  895. 39:03right then average lead time which I was
  896. 39:05talking about was 12 week almost double
  897. 39:08than the competitors so you can just
  898. 39:10imagine in this era if you are saying 12
  899. 39:13weeks uh you know uh lead time so there
  900. 39:17is uh you know uh Justin Time system
  901. 39:20where is minimizing the inventory all
  902. 39:22those things right so then overall
  903. 39:26scenario started changing their
  904. 39:27competitors started you know acquiring
  905. 39:29their position so then the new president
  906. 39:33joined and he was expert in implementing
  907. 39:35lean manufacturing Supply management
  908. 39:37practices and he developed one strategy
  909. 39:40for 3 to 5 years and the main purpose
  910. 39:42was how they can globally implement this
  911. 39:45system of implementing lean right how
  912. 39:48they can evap their this Supply Chain
  913. 39:51management you know uh platform right
  914. 39:54and they can minimize the total cost and
  915. 39:56as well as lead lead time the main
  916. 39:58function here was lead time and then
  917. 40:00they were lacking in house strategic
  918. 40:02sourcing if you are not producing inh
  919. 40:04house so that means majorly you are
  920. 40:06depending outside outside means lead
  921. 40:09time will be higher your dependency on
  922. 40:11others so then he prepared one cross
  923. 40:14functional team including all the uh
  924. 40:16different experts from all the team
  925. 40:18purchasing Marketing sales uh R&D
  926. 40:21manufacturing so that he can have the
  927. 40:24overall uh comprehensive View so they
  928. 40:27defined strategic objective obviously
  929. 40:30reducing lead time and at least they
  930. 40:32want to reduce 80% 2 weeks should be
  931. 40:35there right because their competitors
  932. 40:38were producing delivering in five to 6
  933. 40:40weeks so they wanted to reduce this they
  934. 40:43specified what are the critical parts
  935. 40:46and those critical Parts due to which
  936. 40:48the total Supply is interrupted In the
  937. 40:51End Market can we find some local
  938. 40:54players for that if we'll find local for
  939. 40:57the critical parts noncritical parts we
  940. 41:00can invent inventor eyesee and we can
  941. 41:03maintain the inventory then they
  942. 41:05assessed and select qualified suppliers
  943. 41:07only who can you know uh go for that
  944. 41:12agreement they can deliver quality
  945. 41:15quantity price right and then supplier
  946. 41:18selection and part allocation was done
  947. 41:21they Consolidated large number of
  948. 41:23supplier into smaller parts and they fed
  949. 41:26them large order but only only thing was
  950. 41:29only promise they took from their
  951. 41:31vendors you need to reduce the lead time
  952. 41:34maintain the quality and minimize the
  953. 41:36price efficiency they awarded those
  954. 41:39players Consolidated which I already
  955. 41:41talked about right so then they
  956. 41:45Implement Canan quantities now they
  957. 41:48implemented Canan production system with
  958. 41:50the vendors that means they designed bin
  959. 41:54depending upon the requirement of that
  960. 41:56particular component and then they
  961. 41:59decided depending upon the forecasting
  962. 42:01depending upon their manufacturing
  963. 42:03requirement they uh Place different
  964. 42:05types of bins right and then they ask
  965. 42:08their vendors to you know replenish
  966. 42:09those bins as per the required quantity
  967. 42:12so can quantities they went for they
  968. 42:15tracked the results and made the
  969. 42:16adjustment if any required and quickly
  970. 42:18we can go through the results marvelous
  971. 42:21results decreased from 6 to 8 weeks to
  972. 42:25only 2 days lead time
  973. 42:27and because you have reduced the lead
  974. 42:29time obviously ontime delivery increased
  975. 42:32from 50% to 95% you are now on time and
  976. 42:36quality is also improved nearby vendors
  977. 42:39supplying quality with latest technology
  978. 42:43price stability 30% inventory dropped by
  979. 42:4650% because earlier you were storing
  980. 42:49products for 6 s weeks because it was
  981. 42:51taking uh 6 seven weeks to replen the
  982. 42:54inventory so that much cash you were
  983. 42:56taking in hand so they implemented this
  984. 42:58lean concept and these are some of the
  985. 43:02uh you can see supplier on time delivery
  986. 43:05is 95% more than that this is how they
  987. 43:09achieved so uh this is a beautiful case
  988. 43:13study we have seen supplier relationship
  989. 43:15management how we can develop the
  990. 43:17suppliers and then we need to develop
  991. 43:19long-term relationship not at the arm
  992. 43:22length we need to keep them very near to
  993. 43:24us we need to segment all the suppliers
  994. 43:27group into different categories how they
  995. 43:29are producing how they are you know uh
  996. 43:32EV uh contributing towards the total
  997. 43:34profit uh the uh risk in the Supply
  998. 43:38right and then we talked about the
  999. 43:40global sourcing can be very important
  1000. 43:43access to uh new suppliers and we talked
  1001. 43:47about Outsourcing how we can do
  1002. 43:49Outsourcing we can be more efficient and
  1003. 43:51we can improve the overall quality of
  1004. 43:54the value chain so these are the
  1005. 43:56reference you can go for further reading
  1006. 43:59that's all thank you very much

About this transcript

This page contains the full transcript of Lecture 37 : Strategic Sourcing by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 6,480 words across 1,006 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.