  3. 0:25hello dear students welcome back to nptl
  4. 0:28online course on Logistics and supp
  5. 0:29Supply Chain management so now we'll
  6. 0:32start discussion on supply chain
  7. 0:34strategy right we'll see what are the
  8. 0:37different factors or maybe impellers we
  9. 0:40can say which are forcing our supply
  10. 0:42chain you know to behave in that way so
  11. 0:46that they can survive for a longer
  12. 0:47period of time there there is as such no
  13. 0:50longer period but yes because daily the
  14. 0:53scenario is changing so they have to you
  15. 0:56know keep on changing their they need to
  16. 0:58keep on revising their capability as
  17. 1:00well so this is a part of your supply
  18. 1:02chain strategy how you are coming up
  19. 1:04with new tools and then maybe how you
  20. 1:07are tracking your customers in that way
  21. 1:10how you are tracking their behavior so
  22. 1:12that you can develop that type of
  23. 1:13particular strategy right so this week
  24. 1:16we'll talk about developing the supply
  25. 1:18chain strategy right and here is the
  26. 1:21basic first introductory part we will'll
  27. 1:23talk about what are the supply chain
  28. 1:25impellers in the last week we talked
  29. 1:27about supply chain drivers right what
  30. 1:29are are main those Logistics and cross
  31. 1:31functional drivers how we can change
  32. 1:34those drivers so that the overall
  33. 1:35efficiency and responsiveness of the
  34. 1:37supply chain can be managed in this
  35. 1:40particular session we'll talk about what
  36. 1:42are the impellers those forces which are
  37. 1:45forcing us to change the drivers to
  38. 1:47manipulate those drivers here and there
  39. 1:50in terms of coming up with the basket of
  40. 1:53product and services right and then
  41. 1:55we'll talk about the value chain as well
  42. 1:57in this particular session right we'll
  43. 1:59talk about some uh specific uh success
  44. 2:02parameters when we'll talk about supply
  45. 2:04chain success and we'll end up with the
  46. 2:07case study right so already we discussed
  47. 2:10about supply chain drivers so other than
  48. 2:12that what are those forces and factors
  49. 2:15we need to consider and these forces
  50. 2:18factors are known as impellers of supply
  51. 2:20chain right in that way how they are
  52. 2:22putting extra pressure on the supply
  53. 2:25chain that this is not now that era
  54. 2:28where you can you know uh stretch a
  55. 2:31customer or maybe you can do something
  56. 2:33uh illegal unethical and then customer
  57. 2:36is not aware about those things right so
  58. 2:39because customer is now full of
  59. 2:41information even if you talk about very
  60. 2:44simple example if you are keeping little
  61. 2:47higher price maybe 1% 2% with your
  62. 2:50competitors in the at the same moment
  63. 2:52they can find out okay the price is
  64. 2:55something else he is offering something
  65. 2:57else so then that way that customer will
  66. 3:00never turn back to you right so these
  67. 3:03are some of the forces because this
  68. 3:06transparency has been maintained
  69. 3:08throughout the supply chain this
  70. 3:09transparency is obviously very very
  71. 3:12important when you are manufacturer you
  72. 3:15are services provider you are those
  73. 3:17product provider you are selling the
  74. 3:19product but this transparency is equally
  75. 3:22spread along that Network for the
  76. 3:25customer as well if you along with other
  77. 3:2830 players in the market operating with
  78. 3:30the same product or Services obviously
  79. 3:33they have access to information of all
  80. 3:36those 30 players right so then you need
  81. 3:39to pick your pricing strategy very
  82. 3:41carefully you need to pick your delivery
  83. 3:43strategy your feature you are offering
  84. 3:45the quality you are offering the variety
  85. 3:48you are offering so that in the end you
  86. 3:50can convince the customer that you
  87. 3:52should visit our store and then you
  88. 3:54should make the purchase decisions so
  89. 3:57other than what drivers we discussed
  90. 3:59obvious ly facility inventory
  91. 4:01Transportation information system
  92. 4:03sourcing
  93. 4:04pricing these drivers are there but
  94. 4:08these drivers we are forced to you know
  95. 4:11change these drivers enhance these
  96. 4:14drivers depending upon those impellers
  97. 4:17right what are those forces coming from
  98. 4:19the market we need to change these
  99. 4:21drivers accordingly and then we will be
  100. 4:23coming up with the competitive strategy
  101. 4:26as well as your supply chain strategy
  102. 4:28having said that competitive strategy
  103. 4:29Str y means for the whole organization
  104. 4:32the competitive strategy may be how you
  105. 4:35can get the maximum customer potential
  106. 4:37right maybe to increase your customer uh
  107. 4:41group right from maybe like right now
  108. 4:43you are having only 10% share you want
  109. 4:45to increase to 25% right how you can do
  110. 4:48that and then you know that you are
  111. 4:50targeting those middle class families or
  112. 4:52lower class families so then your
  113. 4:53pricing is very very important
  114. 4:56efficiency in supply chain is very very
  115. 4:58important so that means because your
  116. 5:00overall vision is to capture that
  117. 5:02mission is to capture that 25% of the
  118. 5:05market based on efficiency cost
  119. 5:08parameter then your supply chain
  120. 5:10strategy should be in synchronization
  121. 5:12with your your overall strategy
  122. 5:14competitive
  123. 5:15strategy so uh if you go through
  124. 5:19literature we have identified initially
  125. 5:22we identified three main impellers and
  126. 5:25in that empowered customer is the first
  127. 5:27one like I talked about
  128. 5:30the knowledge the customer is having
  129. 5:33right now and how he's getting the
  130. 5:35knowledge because of the access to
  131. 5:37information simple example if you want
  132. 5:40to book air ticket right so then you
  133. 5:44have all those options maybe make my
  134. 5:47trip is there go Vivo is there maybe
  135. 5:51IRCTC is there maybe the individual
  136. 5:54website of that Airlines is there right
  137. 5:57so all these platforms are there not
  138. 5:59only the now what this these platform
  139. 6:02will do Indigo will not do that because
  140. 6:04Indigo will give the information this
  141. 6:07you can consider at the first level
  142. 6:10indigo is at first level in that way
  143. 6:12providing the services you'll get all
  144. 6:14the related information of the Indigo
  145. 6:16flights going from one point to the
  146. 6:19other point where you are searching
  147. 6:20right and prices of all the points how
  148. 6:23many stoppage are there timing and all
  149. 6:25that information you will get right
  150. 6:28second level you can in include these
  151. 6:30players now what the second level
  152. 6:32players are doing you will search flight
  153. 6:35from Kolkata to Delhi it will give you
  154. 6:37all the possible combinations mix up of
  155. 6:41maybe different players individual
  156. 6:43players pricing all those things roots
  157. 6:46and how many stoppage and all those
  158. 6:49things will be highlighted on the
  159. 6:51website and then you can compare within
  160. 6:53no time and that way you you are as
  161. 6:56empowered
  162. 6:57customer now there is this is not the
  163. 7:00end the next third level you
  164. 7:03include kind of exigo player now what
  165. 7:07exigo is doing exoo is putting all these
  166. 7:10platform at one platform right what is
  167. 7:13happening sometime I'm confused that
  168. 7:15whether I'll get this ticket cheaper on
  169. 7:17make my trip or goo or IRCTC or some
  170. 7:21other platform right so then you will
  171. 7:24first you'll check in make my trip then
  172. 7:26go then make IRCTC so this will consume
  173. 7:30time I want immediate solution you go to
  174. 7:33exigo exigo will give you from Kolkata
  175. 7:35to Delhi all the possible flights and
  176. 7:38prices what is the best price in mmt
  177. 7:41what is the best price in goo IRCTC in
  178. 7:44for particular flight right so this this
  179. 7:47is how the customer is so empowered so
  180. 7:51any offline retailer cannot say that I'm
  181. 7:55charging 3,000 and you are getting that
  182. 7:57product through online on 20 2500 right
  183. 8:01so then maybe offline retailer can you
  184. 8:05know uh negotiate with you as per the
  185. 8:08price somewhere maybe 200 or 300 rupees
  186. 8:11but then in the end he'll say this point
  187. 8:13that maybe online it will take time so
  188. 8:15then responsive supply chain we are
  189. 8:18saying that within same day delivery
  190. 8:20within two days delivery if that product
  191. 8:22is not that much Argent we can wait for
  192. 8:242 days we can save 500 bucks what is
  193. 8:27that so that way the customer is more
  194. 8:30empowered right he's having access to
  195. 8:33whole information and thanks to the it
  196. 8:36tools we are having now this is one
  197. 8:39example I quoted for customer let's take
  198. 8:42now the producer perspective the
  199. 8:45manufacture the services provider we
  200. 8:48have material resource planning
  201. 8:50enterprise resource planning vendor
  202. 8:51manage inventorying total asset
  203. 8:53visibility these kind of softwares are
  204. 8:55there right in the warehouse we have
  205. 8:58warehouse management soft softwares
  206. 9:00during transportation we have
  207. 9:01transportation management softwares
  208. 9:04finding the best route optimum route in
  209. 9:06terms of distance in terms of what load
  210. 9:08you are carrying in terms of
  211. 9:09infrastructure road condition everything
  212. 9:11weather condition you are getting MRP
  213. 9:14material resource planning Erp
  214. 9:16enterprise resource planning how many uh
  215. 9:19different raw material required what is
  216. 9:21the what should be the batch size of
  217. 9:23each material when you should place
  218. 9:25order with the vendors and out of three
  219. 9:27vendors a vendor will get this much
  220. 9:29order B will get this much all this
  221. 9:32information thanks to all it tools they
  222. 9:34are collecting the information the
  223. 9:36future of supply chain we talked about
  224. 9:38in last to last session I think where we
  225. 9:40talked about supply chain control Towers
  226. 9:43all these parameters can be tapped there
  227. 9:46and if you are taking decision related
  228. 9:48to sourcing related to procurement
  229. 9:50regular procurement okay five listed
  230. 9:53vendors are there for this particular
  231. 9:55component let us check the vendor rating
  232. 9:57of each vendor
  233. 9:59so related to price this third vendor is
  234. 10:02most efficient related to delivery first
  235. 10:05is most you know quick in making
  236. 10:07delivery related to Quality fifth one is
  237. 10:09the high reliable in terms of quality
  238. 10:12quickly you are getting the information
  239. 10:14and then you can place the orders the
  240. 10:17third impeller of supply chain is
  241. 10:20globalization now because this uh we
  242. 10:23cannot say that here this is working in
  243. 10:25local market and it is not working in
  244. 10:28foreign market if these days if someone
  245. 10:30is coming that uh with the credit card
  246. 10:32option to you and it is saying that only
  247. 10:34it will work in India hardly I think uh
  248. 10:37anyone will be interested in that how
  249. 10:40you can provide Solutions overseas when
  250. 10:42we are visiting because that frequency
  251. 10:44of traveling is also now increasing day
  252. 10:46by day right and globalization it's not
  253. 10:49only that local Indian market or any
  254. 10:51other Asian market right so wherever you
  255. 10:54are getting the best quality best
  256. 10:56quantity best price you should Outsource
  257. 10:59and then within no time we thanks to our
  258. 11:02that infrastructure fastest
  259. 11:04infrastructure and that way channelized
  260. 11:06supply chain distribution Network that
  261. 11:09we are getting delivery in no time so
  262. 11:11then globalization is third major
  263. 11:13impeller which is forcing you to be
  264. 11:16always responsive cost efficient you
  265. 11:19cannot say that this we are
  266. 11:20Manufacturing in India this is more cost
  267. 11:22carrying why don't you shi to the some
  268. 11:24other location we are you know you can
  269. 11:27reduce that cost you can reduce the raw
  270. 11:31material cost labor cost the location
  271. 11:34where you are spending your you are
  272. 11:36planning your facilities that cost you
  273. 11:38can reduce right so that globalization
  274. 11:42is another major Impaler other than uh
  275. 11:44these two because the research now is
  276. 11:47more on how we can go for sustainability
  277. 11:49how we can enhance the integration and
  278. 11:52collaboration among those uh players so
  279. 11:55that way it is also working as one of
  280. 11:57the impeller now sustainability see uh
  281. 12:01because every other day in news also
  282. 12:04because this time is now summer season
  283. 12:06is going on so yesterday there was news
  284. 12:0953 degree temperature in Delhi first
  285. 12:12time right so that means then maybe
  286. 12:14couple of days we'll talk about the uh
  287. 12:17environmental change and then uh how
  288. 12:20things are pollution and we'll talk
  289. 12:21about having debates uh in the media and
  290. 12:24all all those things will be there then
  291. 12:27in that way customer is also getting in
  292. 12:29information at least this is the stage
  293. 12:31where we are getting information we
  294. 12:33somewhere we in our unconscious mind we
  295. 12:35are thinking about yes we should make
  296. 12:37some decision we should take some steps
  297. 12:39to you know go sustainable go green we
  298. 12:42should reduce the wastage and then when
  299. 12:44we are going uh in the office we are
  300. 12:47keeping all the lights on AC always on
  301. 12:49and all those things are happening and
  302. 12:51then we are actually not you know trying
  303. 12:53to or we are not relating what we are
  304. 12:55doing in our day routine life but very
  305. 12:57soon the time will come when you will be
  306. 12:59forced to you know you you will force
  307. 13:02yourself only that you have to be
  308. 13:03sustainable and it will be unbearable
  309. 13:06for everyone right so then
  310. 13:09sustainability talking about Supply
  311. 13:10chains we have to stretch in that Way
  312. 13:13Green Logistics we talked about green
  313. 13:15Supply recycling reuse remanufacturing
  314. 13:18refurbishment of the products how we can
  315. 13:21ensure how we can extend the life of the
  316. 13:23product so that waste should not be
  317. 13:25generated how we can add value to the
  318. 13:29after the end use of the product right
  319. 13:31so that sustainability measure is
  320. 13:33important collaboration and integration
  321. 13:35is another thing that it's not that in
  322. 13:38isolation you are working and you are
  323. 13:41collaborating with your suppliers and uh
  324. 13:43then you are there and maybe distributor
  325. 13:45is there you have to include the
  326. 13:47customer also in your manufacturing
  327. 13:49process that concept is also now going
  328. 13:51that customer are part of only Services
  329. 13:55processes manufacturing also we need to
  330. 13:57record the customer requirement their
  331. 13:59specification like d is doing for years
  332. 14:02together right they are recording their
  333. 14:04requirement their specification and then
  334. 14:07they are configuring the laptop or PCS
  335. 14:10whatever your requirements are as per
  336. 14:12that so in that way it can happen only
  337. 14:15when you have strong partnership and
  338. 14:17relationship not only with suppliers
  339. 14:20with suppliers with storage houses with
  340. 14:22manufacturing houses with your uh
  341. 14:24distribution network with your
  342. 14:26warehouses distribution fulfillment
  343. 14:28centers Transportation agencies with
  344. 14:31customers with end consumers right from
  345. 14:34where the information is being generated
  346. 14:36and being circulated so these five major
  347. 14:39impellers of Supply chains are there
  348. 14:41which which will help you to design your
  349. 14:44supply chain so uh these two video link
  350. 14:47I have given you first one is on
  351. 14:49highlighting the bull whip effect of
  352. 14:51covid-19 pandemic you can just go
  353. 14:53through this video and uh here it has
  354. 14:56been highlighted that how during Co 19
  355. 14:59we realized that uh maybe suddenly there
  356. 15:02will be because shutdown was happening
  357. 15:04maybe tomorrow we'll not get the grocery
  358. 15:06items how we'll survive tomorrow we'll
  359. 15:08not get the all the kitchen items right
  360. 15:11so then we started stocking the items
  361. 15:13right we started purchasing more and
  362. 15:15more than what we are consuming right so
  363. 15:19that is known as Panic buying so this
  364. 15:21video is on that right how it can see
  365. 15:24now there is again the same population
  366. 15:26is there earlier they were let's say
  367. 15:29they were uh giving demand for 500 units
  368. 15:32now suddenly 1,500 units it is coming
  369. 15:35right so that means still the demand is
  370. 15:37same but the because of the panic buying
  371. 15:40they started purchasing more right so
  372. 15:42this video is on that another case of
  373. 15:45Amazon giving customer what they want
  374. 15:47you can see just that this is
  375. 15:49highlighting all the impellers how and
  376. 15:52what customers are you know time to time
  377. 15:55they are uh uh it's not that for one
  378. 15:58product I will say tomorrow I need that
  379. 16:01product for other product maybe I'll say
  380. 16:03I can wait for 5 days so C Amazon need
  381. 16:06to design the services as per that they
  382. 16:09need to operate their Network
  383. 16:10distribution Network as per that right
  384. 16:13maybe today I'm cost efficient because I
  385. 16:15can afford 10 days delivery but tomorrow
  386. 16:18I want same day delivery of one product
  387. 16:21so then I am ready to pay higher so that
  388. 16:24these two videos you can just go through
  389. 16:27so there are some Concepts Maybe we
  390. 16:29discussed a little bit about that or
  391. 16:31maybe uh on on that uh during this last
  392. 16:35five six uh weeks Journey so just
  393. 16:37quickly we'll go through if we missed
  394. 16:39some points of supply chain system
  395. 16:41concept so this is holistic approach and
  396. 16:44interconnected system integrated system
  397. 16:47right so that means it's not supply
  398. 16:50chain for one manufacturer it's not
  399. 16:52supply chain of the raw material
  400. 16:54supplier it's one complete Supply let us
  401. 16:56take the example like the W be effect we
  402. 16:59were talking about right how the thing
  403. 17:02at one hand end is happening and it is
  404. 17:06how it is reaching to the other end of
  405. 17:09the supply chain right so because it is
  406. 17:12system concept we need to avoid this
  407. 17:14bull effect overlap in the information
  408. 17:17we are sharing right so you need to
  409. 17:20recognize the changes or disruptions
  410. 17:22whatever are happening at one end and
  411. 17:26because these changes or disruptions
  412. 17:29will have ripple effect how like I told
  413. 17:31you during covid-19 we suddenly started
  414. 17:35realizing maybe tomorrow there will be
  415. 17:37shortage of the grocery item not only
  416. 17:40grocery item let's say there was sudden
  417. 17:43increase in using the hand gloves using
  418. 17:45the mask sanitizers and mask price
  419. 17:48earlier maybe 20 25 rupees now it was
  420. 17:52coming with 100 rupees cost right so
  421. 17:55because there was increase in the
  422. 17:58disruption happen happened in the that
  423. 17:59supply chain right and demand because
  424. 18:01now every other person is using the mask
  425. 18:04earlier we were using rarely or when we
  426. 18:06were traveling or when we are usually
  427. 18:09visiting the hospital then we used to
  428. 18:11wear right but now you you after
  429. 18:14covid-19 during that particular period
  430. 18:16of two years especially you see if you
  431. 18:18are traveling through air right how many
  432. 18:20PP kit you were bearing face shield face
  433. 18:24mask gloves all those things right so
  434. 18:27then this this is this disruption at one
  435. 18:31end happened so then raw material supply
  436. 18:34interrupted right shortage of raw
  437. 18:36material supply so reple effect is there
  438. 18:38so this is total system concept we need
  439. 18:41to understand right total cost concept
  440. 18:44right this is one system concept so cost
  441. 18:47is also the total supply chain cost
  442. 18:50right if I'm saying that total supply
  443. 18:52chain cost is $500 from starting to end
  444. 18:56that means it's not only the
  445. 18:58manufacturer is bearing some part
  446. 19:01supplier who is supplying the product is
  447. 19:03bearing the suppliers of supplier some
  448. 19:05part is bearing manufacturer is bearing
  449. 19:08then the distributor who is Distributing
  450. 19:10to 500 retailer he is bearing some cost
  451. 19:13so this is total supply chain cost and
  452. 19:16in the end if I'm saying the profit by
  453. 19:18selling one unit is $50 this profit is
  454. 19:22complete supply chain profit right it
  455. 19:25will be shared throughout the supply
  456. 19:27chain suppliers of supplier will get
  457. 19:29some margin suppliers will get margin
  458. 19:31co-manufacturer manufacturer will get
  459. 19:33margin Warehouse keeping all those
  460. 19:35people will get margin Transportation
  461. 19:37agencies will get margin and your retail
  462. 19:40distribution who is keeping your
  463. 19:41inventory will get in the end some
  464. 19:44margin out of this $50 right so total
  465. 19:47cost concept means total this will be so
  466. 19:51that means cost procurement cost will be
  467. 19:54there production Transportation
  468. 19:55inventory storage distribution starting
  469. 19:57to end to complete supply chain cost
  470. 20:00will be there now in that we need to
  471. 20:03make the tradeoff so whenever we are
  472. 20:05saying we we have seen we are making
  473. 20:07trade off when we designed our supply
  474. 20:09chain drivers in terms of efficiency and
  475. 20:13responsiveness
  476. 20:16right so so then we saw that if we are
  477. 20:20spending more on keeping inventory we
  478. 20:22are more responsive right because
  479. 20:24quickly customer is coming we are
  480. 20:26meeting the demand but at the same time
  481. 20:28we saw that the price of keeping uh the
  482. 20:31cost of keeping that inventory was
  483. 20:33increasing so efficiency is compromised
  484. 20:35right so in supply chain we are making
  485. 20:39Traders like that we are having so many
  486. 20:41different Traders cost and quality so
  487. 20:44Amazon divided different customer
  488. 20:46segments like I quoted the example of
  489. 20:49PNG so for detergent so maybe for surf
  490. 20:54XEL is for middle class family uh the
  491. 20:56nma is for lower class as per the the
  492. 20:58pricing I'm saying right so they have
  493. 21:00identified different different customer
  494. 21:03groups accordingly they have designed
  495. 21:05the product right pricing is done but
  496. 21:08then yes cost and quality cost is lesser
  497. 21:11quality will be compromised somewhere
  498. 21:13right cost and Speed Amazon if you want
  499. 21:16one day delivery they will charge you
  500. 21:18$25 right if you want five six days
  501. 21:22delivery maybe they will charge $5 right
  502. 21:24so then if you want standed delivery
  503. 21:26maybe 10 to 15 days then there will be
  504. 21:29no charge right so that means cost and
  505. 21:32delivery if you'll reduce the cost
  506. 21:35obviously they will ship when they are
  507. 21:37getting the economies of scale right so
  508. 21:39that way responsiveness is compromised
  509. 21:41inventory level and Customer
  510. 21:43responsiveness because I'm keeping that
  511. 21:46much inventory which I can meet maybe
  512. 21:48the daily demand or maybe the first half
  513. 21:50of the next day so suddenly if there is
  514. 21:53more Demand right so then that means so
  515. 21:56I will say no I'll be stock off so that
  516. 21:59means the responsiveness is compromised
  517. 22:01but I want to save in inventory right so
  518. 22:04that I can do so uh this requires
  519. 22:07decision makers to carefully evaluate
  520. 22:09the implication of different choices so
  521. 22:12on one hand maybe you can somewhere you
  522. 22:14can say we we can afford to be sometimes
  523. 22:17stock out but on other hand you can say
  524. 22:20that yes we always we need to ensure the
  525. 22:23uh supply of the product we need to keep
  526. 22:25that Safety stock seasonal stock if
  527. 22:28there there is Spike in the season we
  528. 22:29need to meet that because if today we'll
  529. 22:32say no to the customer next day that
  530. 22:34customer will not come back right
  531. 22:36another is W beip effect we have
  532. 22:38discussed this obviously information
  533. 22:41delay forecast inaccuracies and Order
  534. 22:44batching right so due to these are some
  535. 22:47of the factors where you know the will
  536. 22:50effect is observed order batching means
  537. 22:53let's say the example we talked about
  538. 22:56that our retailer placed order for 50
  539. 22:58units then manufacturer started
  540. 23:01producing for 75 units because
  541. 23:03manufacturer knows that for 50 units
  542. 23:06again we'll change over to some other
  543. 23:08product so change over will take time
  544. 23:10let us produce maybe 75 or 100 items and
  545. 23:13then we'll change over to the next model
  546. 23:15so if we'll increase the batch size the
  547. 23:18cost per unit production will decrease
  548. 23:21right because we are now producing more
  549. 23:23economies of scale after standardization
  550. 23:25once you are set you can keep on
  551. 23:27producing right so without any defect
  552. 23:29that way you can ensure but yes then if
  553. 23:32you are producing extra to save that to
  554. 23:35get the economies of scale then you are
  555. 23:38spending extra to keep that extra
  556. 23:40inventory so there is again trade off
  557. 23:43between inventory you are keeping and
  558. 23:45the economies of scale you are getting
  559. 23:48by increasing the batch size right so
  560. 23:52bull effect may be in the best example
  561. 23:56in markets as when you are you know
  562. 23:58spending in the market you're buying
  563. 24:00stocks online right so when everyone
  564. 24:02starts buying the price is increasing
  565. 24:04right so then if fuel start selling so
  566. 24:07others are also feeling maybe uh now
  567. 24:09because election results are going to be
  568. 24:11declared on 4th June right so then
  569. 24:14analyst those Market analyst they are
  570. 24:16analyzing the if this will happen there
  571. 24:18will be you know uh again rise in the
  572. 24:21stock price so that means the demand is
  573. 24:24increasing when stock price is rising
  574. 24:26and then demand will decrease Supply
  575. 24:28will be increased stock price will fall
  576. 24:30down so this is how it is working on
  577. 24:32Market sentiments right so means again
  578. 24:36that bu bip effect is there right if
  579. 24:38you're uh assessing maybe 5% change your
  580. 24:42next player in the supply chain will
  581. 24:43assess it as 7% next you will pass the
  582. 24:46information every time when we are
  583. 24:48passing the information that means we
  584. 24:50have
  585. 24:50multi-stages so the many stages long
  586. 24:54structure you will opt so that means
  587. 24:57that will be effective will be enhanced
  588. 24:59right so how much flat structure you can
  589. 25:02opt for your organization for sharing
  590. 25:04the information the accurate information
  591. 25:07you will get if directly if something H
  592. 25:10is happening in the market if directly
  593. 25:12you are recording that without any bull
  594. 25:14be effect that means that whatever
  595. 25:17customer is requiring you can supply the
  596. 25:20exact product coming to the value chain
  597. 25:23see these are time to time I have talked
  598. 25:26about but let us go in the structure way
  599. 25:28these all are non value adding
  600. 25:30activities and these are value adding
  601. 25:32activities having said that I'm not
  602. 25:34saying that these HR activities are not
  603. 25:36required financing accounting activities
  604. 25:39information techn information technology
  605. 25:41can be value adding can be non value
  606. 25:43adding I'll tell you the scenario right
  607. 25:46so these are those activities which are
  608. 25:48supporting your these actions like if
  609. 25:51I'll talk about Information Technology
  610. 25:54how you will develop the new product if
  611. 25:56you are not having information
  612. 25:58technology to tap the information coming
  613. 26:00from the market so that means in that
  614. 26:03way if you this information technology
  615. 26:06is helping you to develop the new
  616. 26:09product new feature that means this is
  617. 26:12value adding activity but if this
  618. 26:14information is helping you to keep the
  619. 26:18inventory level in the Market at the
  620. 26:21safe inventory then it is not going to
  621. 26:23add any value for the customer right so
  622. 26:26that means now it is non value adding
  623. 26:27activity
  624. 26:29Finance accounting will see one by one
  625. 26:31all these operations new product
  626. 26:33development see if I'm a renovating my
  627. 26:37product I'm providing you new features
  628. 26:39right so that means these new features
  629. 26:42customer is directly getting the benefit
  630. 26:44so this is value adding activity
  631. 26:46marketing and sales marketing and sales
  632. 26:50see uh if I'm recording your requirement
  633. 26:53what is marketing I'm recording your
  634. 26:55requirements and accordingly I'm
  635. 26:56providing you the customized product and
  636. 26:58services that means this is value adding
  637. 27:00activity then again if I'm providing you
  638. 27:03after selling this product again I'm
  639. 27:06coming up with the promotional offers
  640. 27:08and all that and in a way educating you
  641. 27:11maybe how you can use that product how
  642. 27:13you can after sale Services also I'm
  643. 27:15providing right so that that is a kind
  644. 27:18of or I'm recording your feedback just
  645. 27:20to improve the services level right so
  646. 27:22then it is value adding activity
  647. 27:24operations obviously core value adding
  648. 27:27activity because here you are doing all
  649. 27:29those activities which are converting
  650. 27:31your raw material into your finished one
  651. 27:33which is creating your you know space in
  652. 27:36the market profit in the market
  653. 27:39margins uh fetching more customers right
  654. 27:42distribution now distribution earlier
  655. 27:44maybe distribution may not be the value
  656. 27:46adding activity for the customer when
  657. 27:48you are going to retailer and picking up
  658. 27:51the inventory right but now if
  659. 27:54distribution is doing the Doorstep
  660. 27:56Delivery so that means it is value
  661. 27:58adding activity for the customer
  662. 28:00customer doesn't have time to visit your
  663. 28:02retail shop customer don't want to carry
  664. 28:05the all the packets right they want that
  665. 28:07it should be delivered at the doorstep
  666. 28:10then distribution is valuing activity
  667. 28:12because I'm driving value out of that
  668. 28:15services like I talked about after sale
  669. 28:18Services if I need some information
  670. 28:20related to how to install that how to
  671. 28:23use that something goes wrong with the
  672. 28:26functioning of that product how quickly
  673. 28:29I can get the after sales Services how
  674. 28:31your customer care support is supporting
  675. 28:34all those points even if I'm going for
  676. 28:36routine maintenance of that product so
  677. 28:38then how you are ensuring that
  678. 28:40supporting activity Finance now the
  679. 28:44budgeting part financial planning
  680. 28:46investment planning working Capital
  681. 28:48Management how you'll ensure the flow of
  682. 28:50the finance through the supply chain
  683. 28:53whatever you are doing whether you are
  684. 28:56maintaining liquidity Ratio or not
  685. 28:58whether you are maintaining inventory
  686. 29:00you are investing highly in inventory or
  687. 29:02technology or not how as a customer I'll
  688. 29:04get benefit out of that so this
  689. 29:06financing budgeting all thing you are
  690. 29:08doing just to keep running your
  691. 29:10organization budgeting is required so
  692. 29:12that you can meet the demand you can
  693. 29:14purchase the orders you can pay for
  694. 29:16those orders and that part right so that
  695. 29:18means this is internal management of
  696. 29:20your organization customer is not going
  697. 29:22to get any value out of that accounting
  698. 29:25again if you are doing the you know
  699. 29:28audits are there why you are doing
  700. 29:30audits how much inventory is there so
  701. 29:32that you can keep the track of the
  702. 29:34inventory that whether we are keeping
  703. 29:35extra inventory or the whatever is
  704. 29:37required what are the assets available
  705. 29:40in the organization whether we are
  706. 29:42utilizing or not in that way accounting
  707. 29:44is related with the assets as well how
  708. 29:46we are keeping the transactions right
  709. 29:49when we are paying to our customer all
  710. 29:51these things you are you know sorry not
  711. 29:53customer when we are paying to our
  712. 29:55vendors right if 90 days 60 days payment
  713. 29:58terms are there when we are paying our
  714. 30:00customer this all you are again
  715. 30:02maintaining your internal supply chain
  716. 30:04nothing to do with the customer right
  717. 30:06information technology already I told
  718. 30:09you it can be value adding it can be
  719. 30:11nonv value adding if you are managing
  720. 30:13information within the warehouse to
  721. 30:15ensure the proper stock rotation to
  722. 30:17ensure that inventory should not go
  723. 30:19obsolete then it is nonv value adding
  724. 30:22activity right Human Resources you keep
  725. 30:24on training developing whatever
  726. 30:26recruitment process selection everything
  727. 30:28placement induction is happening that is
  728. 30:31just to keep running your organization
  729. 30:33whether you have today 500 workers or
  730. 30:36thousand workers I really don't care as
  731. 30:39long as I'm getting my product with
  732. 30:41whatever specifications you have
  733. 30:44designed these are some of the factors
  734. 30:46we should consider when we are saying
  735. 30:48that the success of any supply chain uh
  736. 30:51will go through quickly Supply sense how
  737. 30:54we can anticipate understand and respond
  738. 30:56effectively you need to sense the supply
  739. 31:00market right so having said that that
  740. 31:03means now we need to take care of your
  741. 31:05supply sources because your supply
  742. 31:07sources raw material supplier are not
  743. 31:09only supplying to your organization they
  744. 31:11are supplying to maybe to your
  745. 31:14competitors to some other other
  746. 31:15Industries as well so you need to sense
  747. 31:18maybe there will be
  748. 31:21uh your raw material suppliers may be
  749. 31:23stock out because of there is excess uh
  750. 31:26demand or maybe other players ERS are
  751. 31:28keeping the excess demand so that they
  752. 31:31can meet that excess demand coming from
  753. 31:34the market during that peak season right
  754. 31:37so in that way you have you have to
  755. 31:39sense the supply then after sensing you
  756. 31:42need to respond how quickly market
  757. 31:45conditions are changing you you have
  758. 31:47says that Supply is also changing right
  759. 31:50so you need to manage with the vendors
  760. 31:52not only with the quantity with the
  761. 31:54quality with the variety with the
  762. 31:56different types of G uh grade of
  763. 31:58material we are using right so all those
  764. 32:01you need to respond to the supply then
  765. 32:05deciding and committing this is the part
  766. 32:07where now you have decided and you start
  767. 32:09implementing your whatever Supply
  768. 32:11strategy you have fixed or demand
  769. 32:13strategy you have fixed right so you
  770. 32:15will go for various strategic options
  771. 32:18you'll set your priorities and make the
  772. 32:20informed decisions so that you can you
  773. 32:23know ensure the smooth supply and demand
  774. 32:26of the supply chain so having said that
  775. 32:29we want continuous demand you need to
  776. 32:32generate Demand right you need to sense
  777. 32:35the demand whether the customer are
  778. 32:37shifting to my customer group or they
  779. 32:39are going to my competitor group if so
  780. 32:42why they are going to my competitor
  781. 32:44group oh they are providing these many
  782. 32:46extra features or maybe they have
  783. 32:49lowered down the price or maybe they are
  784. 32:52uh doing they're providing some
  785. 32:54promotional offers right so in that way
  786. 32:57we need to understand that their
  787. 32:59preferences we need to forecast the
  788. 33:01demand pattern and we need to align our
  789. 33:03supply chain activities as per that and
  790. 33:06once we recorded the demand we need to
  791. 33:09respond we need to how you will respond
  792. 33:11to demand you will start acquiring the
  793. 33:13raw material you'll start planning your
  794. 33:16uh production scheduling sequencing
  795. 33:19everything you will do how many models
  796. 33:21you are manufacturing different models
  797. 33:24how many units are required inventory
  798. 33:26level you will set accordingly you will
  799. 33:28uh set up your and polish your
  800. 33:30distribution networks to complete to
  801. 33:32ensure the Fulfillment processes are
  802. 33:35happening on time and Final End delivery
  803. 33:38can be done right so we can conclude
  804. 33:41here that so success of supply chain
  805. 33:44obviously how quickly you are sensing
  806. 33:47the market right and then it's not only
  807. 33:50one end you need to sense your other end
  808. 33:53the backward integration you with your
  809. 33:55suppliers you need to sense right cuz if
  810. 33:58Supply is coming from them only then you
  811. 34:00can meet the demand of the customer
  812. 34:02right and then we need to take care of
  813. 34:04all the empowers and the customer is
  814. 34:07empowered but in that way the
  815. 34:09manufacturer is also empowered right
  816. 34:11manufacturing is having all the access
  817. 34:14if I'm just I quoted one example if I'm
  818. 34:17looking for one ticket so see I can get
  819. 34:20information from anywhere but on the
  820. 34:22same time indigo is also getting
  821. 34:24information make my trip is also getting
  822. 34:27information that there is Need for
  823. 34:29ticket I need to travel from Kolkata to
  824. 34:32Delhi you see if you'll keep on
  825. 34:34searching you will get targeted
  826. 34:36advertisement in your social media
  827. 34:38website whenever you will open you'll
  828. 34:40get that 5% Don the price like this and
  829. 34:43when you'll actually start booking the
  830. 34:45ticket then you'll see there will be
  831. 34:47increase in the price because they know
  832. 34:49that continuously you are tracking that
  833. 34:51so both way customer is also empowered
  834. 34:53and supplier is also empowered in that
  835. 34:56way right and then lest development in
  836. 34:58terms of sustainability so that also we
  837. 35:01need to take care because this now the
  838. 35:03coming era is we need to set up the
  839. 35:05sustainable supply chain where we need
  840. 35:08not only to ensure the delivery of the
  841. 35:10final product we need to ensure how
  842. 35:12after the use of that final product can
  843. 35:15be again utilized right so if I'm
  844. 35:18ensuring that through my supply chain my
  845. 35:20customer will be more delighted they
  846. 35:22will feel more satisfied oh this supply
  847. 35:25chain partner or this services provider
  848. 35:28is doing these kind of activities let us
  849. 35:30go to him and get the services right so
  850. 35:34uh these all are references for your
  851. 35:36further reading thank you very much

About this transcript

This page contains the full transcript of Lecture 31: Supply Chain Impellers and Value Chain by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 5,713 words across 851 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.