  3. 0:25hello dear friends welcome back to nptl
  4. 0:27online course on Logistics and supply
  5. 0:29chain management I'm Dr vikas takur
  6. 0:32assistant professor Department of
  7. 0:33humanities and social sciences IIT kakur
  8. 0:36so now today we'll talk about uh supply
  9. 0:40chain models and modeling system we'll
  10. 0:42see what are the different options we
  11. 0:44have when we we will Define the overall
  12. 0:46layout for the supply chain and then
  13. 0:48we'll you know model all those scenarios
  14. 0:51and we'll see what are the results of
  15. 0:53the simulation if we go with one
  16. 0:55particular type of model and then how we
  17. 0:57can adjust all those parameters so that
  18. 1:00we can come up with the desired output
  19. 1:02whatever is the requirement by the
  20. 1:04customer either customer is maybe more
  21. 1:07uh cost focused or maybe a customer
  22. 1:10wants responsive kind of delivery so
  23. 1:13those parameters we'll see right so this
  24. 1:16modeling system will help us to you know
  25. 1:19model all those requirements of the
  26. 1:20customers we'll also uh consider the
  27. 1:24constants from the supply chain side
  28. 1:26right what are the capabilities of our
  29. 1:28supply chain we'll also so consider that
  30. 1:30all the stakeholders will take into
  31. 1:32picture and then we'll see this is what
  32. 1:34maximum we can do using that particular
  33. 1:37approach right so uh This Is How we'll
  34. 1:40proceed for this we'll just introduce
  35. 1:41about the supply chain modeling what are
  36. 1:44different components we'll consider when
  37. 1:46we'll go for the modeling process and
  38. 1:48then we'll talk about some supply chain
  39. 1:50models and uh obviously uh we'll talk
  40. 1:53about uh the future in in this modeling
  41. 1:56system right and we'll end up with some
  42. 1:58cases right so supply chain modeling
  43. 2:01designing and analyzing a supply chain
  44. 2:03to identify potential improvements right
  45. 2:06so that means it's a kind of design of
  46. 2:09experiment approach where we will see
  47. 2:12you know uh we'll try different types of
  48. 2:15inputs right and in different quantities
  49. 2:18right this is how you uh initially how
  50. 2:20you are learning the cooking process
  51. 2:22same way right so sometimes you are
  52. 2:25adding some ingredient maybe in more
  53. 2:27quantity so then you will suddenly after
  54. 2:29analyzing the output tasting that food
  55. 2:32you'll realize okay I need to reduce the
  56. 2:34quantity of that particular ingredient
  57. 2:36or maybe I need to increase that so in
  58. 2:38that way we can simulate different
  59. 2:40scenarios just to we'll find out what
  60. 2:43are the outputs whether the outputs are
  61. 2:45efficient the way we want that uh system
  62. 2:48should behave right so we can compare
  63. 2:51with the whatever uh you know
  64. 2:53pre-assumptions we have about that model
  65. 2:56so either we can talk about the offline
  66. 2:58model static or or we can go for online
  67. 3:01model this is known as offline model
  68. 3:04this is known as online model offline
  69. 3:07means we'll take care of the present
  70. 3:10scenario and we'll model the factors
  71. 3:12likewise right we'll consider all the
  72. 3:14situations uh whatever is right now
  73. 3:16we'll record the data on that and on
  74. 3:18that basis we'll run our model and we'll
  75. 3:20say this is going to be the output if
  76. 3:22we'll go with this approach right
  77. 3:24Dynamic model is a kind of model we
  78. 3:27which continuously feeds data inside the
  79. 3:29system and then is there any changes in
  80. 3:32the environment that also we can uh
  81. 3:34reflect on that so it's a kind of we
  82. 3:36know we call it online system as well
  83. 3:39and then we can go for the Monte Carlo
  84. 3:41simulation models where we can talk
  85. 3:43about different scenarios and those
  86. 3:45scenarios if will go by one way what
  87. 3:47will be the output and if will go by
  88. 3:50other way what will be the output and
  89. 3:52chances of happening that particular
  90. 3:54thing we can uh figure out all those
  91. 3:56things right so talking about either
  92. 3:59local supply chain or Global Supply
  93. 4:01Chain right so we have you know so many
  94. 4:04different stakeholders we have so many
  95. 4:06different processes different activities
  96. 4:09so many different products we are
  97. 4:10handling through the same supply chain
  98. 4:12right if raw material is there that is
  99. 4:14different product finished good is
  100. 4:16different product after returning back
  101. 4:18that packaging is another different
  102. 4:20product right or maybe after the end of
  103. 4:22life we are handling another kind of
  104. 4:24product which requires allog together
  105. 4:26another set of activities to perform
  106. 4:28that right and in in that way so many
  107. 4:30different organizations are involved so
  108. 4:33like we have raw material suppliers we
  109. 4:35have manufacturers we have Co
  110. 4:37manufacturers we have Distributors we
  111. 4:39have warehousing partners and then end
  112. 4:42mile delivery partners are also there so
  113. 4:45all those things we can model in this
  114. 4:48system right so any miscalculation will
  115. 4:51you know you will land up with the uh in
  116. 4:55the scenario where you will be facing
  117. 4:57more risk uncertainties will be there
  118. 5:00because you could not figure out the you
  119. 5:02know dynamic environment in that way and
  120. 5:04then interruptions to your smooth
  121. 5:06supplies and then obviously when you are
  122. 5:08you know reacting here and there you are
  123. 5:11trying to somehow manage the things your
  124. 5:14cost will be higher on that side because
  125. 5:16you are not you know standardizing the
  126. 5:19process so that will lead to extra cost
  127. 5:22so then after uh you know uh replicating
  128. 5:26all the scenarios within your model or
  129. 5:29different models you can pick the most
  130. 5:31suitable supply chain model that depends
  131. 5:34upon whether that most suitable supply
  132. 5:36chain model for one maybe it is cost
  133. 5:40efficient and for other maybe it is
  134. 5:44responsive kind of model which is you
  135. 5:47know responding so quickly to customer
  136. 5:49requirements that you are changing those
  137. 5:52things so depending upon the different
  138. 5:54choices we can then come up with the the
  139. 5:57final model either your supply chain now
  140. 5:59is cost efficient or you are lying
  141. 6:01toward the responsive side right so
  142. 6:03these two ends are there either you can
  143. 6:06be cost efficient or you can be
  144. 6:08responsive but yes we as supply chain
  145. 6:11you know managers or whatever
  146. 6:13organizations are working we are not
  147. 6:15purely saying that we are only cost
  148. 6:17efficient we will not take care of any
  149. 6:19kind of input which is coming maybe in
  150. 6:21terms of quality maybe in terms of
  151. 6:23quantity maybe in terms of variety you
  152. 6:25are putting to us so that will not say
  153. 6:28right so yes some somewhere we'll find
  154. 6:30out the mixture okay this particular
  155. 6:32product requires most uh maybe cost
  156. 6:35efficient supply chain we'll somewhere
  157. 6:37set the parameter here maybe this
  158. 6:40requires a kind of Emergency Services
  159. 6:43Healthcare Services we can set up our
  160. 6:45parameters somewhere here right so
  161. 6:48obviously the ultimate purpose is to
  162. 6:49reduce the cost increase the efficience
  163. 6:52and customer satisfaction within that
  164. 6:55particular uh Target area where we are
  165. 6:58saying that either we are responsive or
  166. 7:00we are cost
  167. 7:01efficient so when you need to model
  168. 7:04these uh different supply chain
  169. 7:07scenarios obviously you need to Define
  170. 7:09what are the components right how those
  171. 7:11components will change here and there so
  172. 7:13that the final outcome will change so
  173. 7:16let's talk about from the very beginning
  174. 7:17Point like procurement so now
  175. 7:20procurement again different decision
  176. 7:23different scenarios are there we have
  177. 7:25multiple vendors or we have single
  178. 7:27vendors right and then how many
  179. 7:30components we are Outsourcing right so
  180. 7:34that means
  181. 7:35procurement then how many Lots in one
  182. 7:39month you are uh procuring then what is
  183. 7:42the lot size right this lot size will
  184. 7:45help you to negotiate
  185. 7:47on your price as well right so these all
  186. 7:52parameters are there when you will
  187. 7:54consider the model you will uh consider
  188. 7:57all these inputs because if you'll
  189. 7:59increase is the lot size this is what
  190. 8:01Walmart is doing always feeding very
  191. 8:03large orders to their suppliers so that
  192. 8:06they can negotiate on the qu uh your
  193. 8:08price right so and then they can
  194. 8:10maintain the that minimum quality level
  195. 8:12as well because this procurement now
  196. 8:15your raw material suppliers they need
  197. 8:17not to go so quickly for change over
  198. 8:20because if you are buying product in
  199. 8:22small small Lots maybe then from one lot
  200. 8:25they are preparing for 50,000 items then
  201. 8:27they are changing over to next lot maybe
  202. 8:29for 30,000 they will prepare then 35,000
  203. 8:32but instead of that maybe if you are
  204. 8:35uniformally you are doing that you are
  205. 8:36producing one item 75k units and then
  206. 8:41you are changing over for the next model
  207. 8:43right so then in that way your supply
  208. 8:46suppliers will also be in that way
  209. 8:48efficient and you can further reduce the
  210. 8:51pricing so this is again one important
  211. 8:53component which you can consider second
  212. 8:55manufacturing where the manufacturing is
  213. 8:58happening right what are are the
  214. 8:59different locations are are you going to
  215. 9:02provide the uh different are you going
  216. 9:04to serve the different Market from
  217. 9:06different locations or maybe one
  218. 9:08centralized facility manufacturing Hub
  219. 9:10will be there and then you will be
  220. 9:12circulating throughout the Indian market
  221. 9:14that can be the another scenario that
  222. 9:16depends upon the initial investment cost
  223. 9:18of setting up any manufacturing unit
  224. 9:21right so then how much of one particular
  225. 9:25model you will if you are having four
  226. 9:27five different production lines so uh
  227. 9:31this is producing A and B model here we
  228. 9:33are producing c d and e model so when
  229. 9:37you will go for change over right so
  230. 9:39that optimal level you can decide that
  231. 9:41if I'll run this particular production
  232. 9:44line for 10 hours continuously that much
  233. 9:47is going to be the productivity because
  234. 9:49whenever we are going for change over in
  235. 9:51the process initial time we are taking
  236. 9:53to set up you know to standardize that
  237. 9:56and then we can produce some rejection
  238. 9:58as well so those factors we'll consider
  239. 10:01third is warehouse now we have two
  240. 10:04different scenario one is we are putting
  241. 10:06this Warehouse very near to the
  242. 10:09customer or maybe
  243. 10:12markets these are n markets are there
  244. 10:15and warehouse is very near so quickly
  245. 10:17you can respond to the customer right so
  246. 10:20that means you can reduce this distance
  247. 10:22outbound Logistics distance to the
  248. 10:24customer to the market and then quickly
  249. 10:27you can respond if this Warehouse is a
  250. 10:29kind of centralized facility which is
  251. 10:31far away from your main markets maybe
  252. 10:34the distance is higher in that case so
  253. 10:38then obviously if you are serving to
  254. 10:40Market 1 or Market 4 so then that much
  255. 10:43distance you are covering right because
  256. 10:46why you are doing that because you don't
  257. 10:48want to set up so many different
  258. 10:51warehouses at different locations If
  259. 10:54instead of you know going for 1 2 3
  260. 10:58different W houses to serve these 10
  261. 11:01markets you are maybe keeping inventory
  262. 11:04at three different locations but when
  263. 11:06I'm having centralized Warehouse I'm
  264. 11:08keeping inventory here only and serving
  265. 11:11all 10 markets from the centralized
  266. 11:13location in that way we can minimize the
  267. 11:16inventory cost but you need to take care
  268. 11:18about the transportation cost because
  269. 11:20then from Central facility every time
  270. 11:23the order is coming from the different
  271. 11:25Market you are moving to that particular
  272. 11:28location so in that way maybe economies
  273. 11:30of scale you also cannot utilize fully
  274. 11:33uh you cannot fully utilize the uh
  275. 11:36container vehicle uh capacity as well
  276. 11:39right Transportation as this is related
  277. 11:41to this structure only I told you we we
  278. 11:45talk about compare the inbound Logistics
  279. 11:47cost with the outbound Logistics cost so
  280. 11:51your outbound logistic cost is always
  281. 11:53higher that means you want your
  282. 11:56Warehouse should be very very near to
  283. 11:59your end Market because this distance if
  284. 12:01you are covering maybe 100 kilomet and
  285. 12:04if this is 5 kilomet so outbound
  286. 12:06logistic cost is higher we discussed in
  287. 12:08another session why this outbound
  288. 12:10logistic cost is higher right and if you
  289. 12:13are following this particular model for
  290. 12:16every Market you are maybe uh covering a
  291. 12:19distance of 35 km 40 km 30 km 25 km so
  292. 12:23that means outbound Logistics distance
  293. 12:26is now increasing right so in that way
  294. 12:28so this is if you will take example if
  295. 12:31you're buying furniture from Amazon flip
  296. 12:33cart so they are disassembling that
  297. 12:36furniture and that it is reaching to
  298. 12:38your doorstep and again you are
  299. 12:40assembling that so this is one way
  300. 12:42because when you will you know buy the
  301. 12:45raw material or you will disassemble the
  302. 12:47product it is easy to carry that product
  303. 12:50from one end to other end the other
  304. 12:52example maybe if you are carrying maybe
  305. 12:55of these um cars in one container maybe
  306. 12:59eight or 10 maximum car you can ship if
  307. 13:01that size is little small of the car
  308. 13:04right so but if you are carrying the raw
  309. 13:06material component you just imagine
  310. 13:09within 10 containers how much raw
  311. 13:12material you can transport so that means
  312. 13:14if your factory is near to the End
  313. 13:16Market then that outbound Logistics cost
  314. 13:19can be reduced but yes then again other
  315. 13:22challenges are also there when you are
  316. 13:24moving near to Market so that means you
  317. 13:27cannot operate with one facility for
  318. 13:30many markets you need to come up with
  319. 13:32many manufacturing units right so that
  320. 13:35way it will increase that cost so
  321. 13:37somewhere in your modeling system you
  322. 13:39need to put all these parameters and for
  323. 13:41a particular product you're depending
  324. 13:43upon the nature of the product size of
  325. 13:45the product how frequently you are
  326. 13:48shipping demand from the market how
  327. 13:50quickly you are changing that product
  328. 13:52all those parameters will consider in
  329. 13:54that model and will come with the best
  330. 13:56fit model which will tell you about all
  331. 13:59these parameters eight components how
  332. 14:01you can set where you should develop
  333. 14:03your warehouses where you should you
  334. 14:06know set your manufacturing unit which
  335. 14:08kind of Transportation mode you should
  336. 14:10use now this is the next parameter
  337. 14:12fourth one is transportation we talk
  338. 14:14about different modes of transportation
  339. 14:17either through Road through rail through
  340. 14:19air through ship right but yes all those
  341. 14:22parameters are there that if you'll go
  342. 14:25by ship the uh least cost method maybe
  343. 14:28and and sustainability also will take
  344. 14:30care if we'll go by Road it is taking
  345. 14:33more time if we'll go by air it is very
  346. 14:37you know Speedy Delivery but yes in that
  347. 14:40way your cost is increasing right so all
  348. 14:43those factors also you will consider
  349. 14:45availability of the infrastructure you
  350. 14:46can use ship only when the
  351. 14:48infrastructure is there right you can
  352. 14:50use air facility only when that
  353. 14:53infrastructure is there but for specific
  354. 14:55products maybe you can go for that kind
  355. 14:57of infrastructure right so fifth one is
  356. 15:00inventory already we discussed we are
  357. 15:02maintaining three different types of
  358. 15:04inventory either raw material or Shamy
  359. 15:06finished good or finished goods and some
  360. 15:09rejected also we are maintaining the
  361. 15:11inventory in the hope that we will
  362. 15:13repair these products and again we will
  363. 15:15resell in the secondary Market or in the
  364. 15:17same Market or somewhere recycling
  365. 15:20remanufacturing can be ensured right so
  366. 15:23now if you are again we'll take that
  367. 15:25scenario only when we are keeping our
  368. 15:27warehouse very near to the uh your
  369. 15:30markets so that means now you are going
  370. 15:33with multiple warehouses for one for uh
  371. 15:37maybe uh this Market these 10 markets
  372. 15:40you are serving by Warehouse 1 we have
  373. 15:43Warehouse 2 which is again serving maybe
  374. 15:46another 20 markets we have Warehouse 3
  375. 15:50which is again serving maybe another
  376. 15:522025 markets right so that means if we
  377. 15:55are moving very near to customer we have
  378. 15:59multiple warehouses so that means that
  379. 16:01will increase the cost of keeping the
  380. 16:03inventory because every Warehouse you
  381. 16:05will keep the inventory that's why
  382. 16:07online platform when we are going so now
  383. 16:10because they are opting for zero
  384. 16:13inventory model it's not inventory LE
  385. 16:15model where earlier they were taking the
  386. 16:18inventory from the you know
  387. 16:19manufacturers from the sellers and they
  388. 16:21were storing in their warehouses and
  389. 16:23whenever Amazon is receiving the order
  390. 16:26they were processing that order but now
  391. 16:28what is happening they are not uh
  392. 16:31keeping inventory in that way minimizing
  393. 16:33the inventory cost and directly
  394. 16:35channelizing the product from the seller
  395. 16:37to the customer right so then you can
  396. 16:42save the inventory cost so these factors
  397. 16:45we will consider because obviously when
  398. 16:48you will model these factors you will
  399. 16:51ensure that you are not stock out and
  400. 16:55also you are not keeping excess
  401. 16:57inventory with you that these two points
  402. 17:00you need to keep in mind right then
  403. 17:02Information Technology this is a kind of
  404. 17:05your component which will affect your
  405. 17:08all the players all the activities in
  406. 17:10that supply chain Network so you need
  407. 17:13quick relevant information transparency
  408. 17:15should be there where is the material
  409. 17:18right now right how much quantity coming
  410. 17:21how much Quant maybe units damaged
  411. 17:23during Transportation during handling
  412. 17:26how many are finally consumed in the
  413. 17:28production of floor how many finally
  414. 17:30consumed in the ne End Market consumed
  415. 17:33by the customer so then this information
  416. 17:36technology what type of system you are
  417. 17:38implementing to ensure the quick
  418. 17:41information sharing system then again
  419. 17:43customer service is another Point what
  420. 17:45type of expectations from the customer
  421. 17:48coming in terms of the quality level
  422. 17:51they are expecting in terms of the
  423. 17:53quantity in terms of the frequency how
  424. 17:56frequently they are buying in terms of
  425. 17:58the variety they are why uh they are
  426. 18:00looking for in terms of the innovation
  427. 18:02in the product they are looking for in
  428. 18:04terms of the delivery they are looking
  429. 18:06for right either they are looking for
  430. 18:08Doorstep Delivery or they are looking
  431. 18:10for some pickup locations or they want
  432. 18:13to F the product and then they want to
  433. 18:15purchase that product right so and this
  434. 18:18is not only the end then customer
  435. 18:20expectation in terms of returns how you
  436. 18:23will manage those returns right or in
  437. 18:25terms of if end of life of that product
  438. 18:30how you are recycling reusing
  439. 18:32remanufacturing that product right the
  440. 18:34final component is a distribution how
  441. 18:36you are ensuring the distribution
  442. 18:38Network right either the last mile
  443. 18:40delivery then last mile delivery then
  444. 18:42how you will combine consolidate
  445. 18:44multiple orders from the same location
  446. 18:47or maybe sometimes what is happening
  447. 18:49when you are not so efficient with your
  448. 18:51information then the same Amazon if you
  449. 18:54are placed two three different orders so
  450. 18:56maybe the delivery person different
  451. 18:58delivery person they are making multiple
  452. 19:00visits to your doorstep instead of
  453. 19:03consolidating into one order and then
  454. 19:06that cost can be reduced but you you
  455. 19:08have experienced that as a customer that
  456. 19:11from Amazon morning to evening you are
  457. 19:13receiving sometimes multiple deliveries
  458. 19:15so why can't they consolidate all the
  459. 19:17orders and then deliver at one time
  460. 19:20right but there may be then you know uh
  461. 19:23challenges with that maybe customer want
  462. 19:25some products uh before 10:00 in the
  463. 19:28morning related to maybe breakfast or
  464. 19:30kind of things right grocery products or
  465. 19:32some products maybe anywhere during that
  466. 19:35day you can transport or deliver right
  467. 19:38so then you need to manage means you
  468. 19:39need to model those factors in
  469. 19:42your uh this modeling uh analysis right
  470. 19:45so already I talked about all these
  471. 19:47components in detail so significance of
  472. 19:50supply chain modeling first is you need
  473. 19:52to this is the ultimate aim we need to
  474. 19:55minimize the cost but maximizing the
  475. 19:57services right so how efficiently we can
  476. 20:00ensure the flow of those three basic
  477. 20:03components material is one information
  478. 20:05is another one how efficiently we can
  479. 20:08ensure the flow of Finance right
  480. 20:10planning and controlling of the flow of
  481. 20:13these resources right we need to plan
  482. 20:16supply chain modeling now once you uh
  483. 20:19worked with all those eight components
  484. 20:22now you have developed the Matrix for
  485. 20:24all those eight uh components now you'll
  486. 20:27go for modeling that that you will put
  487. 20:29all those constraints these are the
  488. 20:31capacity limitations these are the
  489. 20:34requirements from the customer this is
  490. 20:36the capacity of our capability of our
  491. 20:39supply chain then you will go for that
  492. 20:41uh modeling and then again I was talking
  493. 20:44about experimentation and scenario
  494. 20:46analysis where you will come up with
  495. 20:49different simulation models different
  496. 20:51scenarios you will simulate and then
  497. 20:54depending upon different scenarios what
  498. 20:56is the output either you are cost cost
  499. 20:58efficient or responsive how you are you
  500. 21:01know uh making the tradeoff between cost
  501. 21:04efficient and responsiveness and types
  502. 21:07of model you can pick linear programming
  503. 21:09where we are defining the linear
  504. 21:10relationship that is the basic
  505. 21:12Assumption of linear programming we are
  506. 21:14defining the linear relationship between
  507. 21:16the uh all those independent variables
  508. 21:18right so whatever we are uh you know
  509. 21:21modeling in that particular model and we
  510. 21:23go for simulation where we are depicting
  511. 21:26different scenarios queing model what is
  512. 21:29the you know this also we are
  513. 21:31considering how many orders are in Q
  514. 21:33what is the Q length idle waiting time
  515. 21:35so right processing time all that will
  516. 21:38consider in queing model statistical
  517. 21:40model different statistical model either
  518. 21:42you talk about you know stochastic model
  519. 21:44you talk about nonprobabilistic model
  520. 21:46deterministic models right so those
  521. 21:49models we can work with in operation
  522. 21:51research we have seen all those models
  523. 21:54like when we talked about transportation
  524. 21:56management this we will discuss in our
  525. 21:58this lecture all always right so that is
  526. 22:01part of your Supply Chain management
  527. 22:02Transportation then assignment models we
  528. 22:04talk about Simplex method we talk about
  529. 22:07uh the project management using you know
  530. 22:09different uh Pro listic Models like
  531. 22:11critical path method and program
  532. 22:12evaluation and review techniques so
  533. 22:14those all are uh different types of
  534. 22:17modeling techniques kind of methods we
  535. 22:19which we can use to optimize our
  536. 22:22processes all right so selecting the
  537. 22:24right model depending upon the uh your
  538. 22:27requirements you will pick Pi the right
  539. 22:29model in the end so these are different
  540. 22:31types of model we'll just quickly go
  541. 22:33through what are these different types
  542. 22:35of model and in that way which model is
  543. 22:39uh you know best fit for a particular
  544. 22:42kind of industry if you talk about
  545. 22:44continuous type of model this is a kind
  546. 22:46of model where continuously your product
  547. 22:48is flowing through the supply chain not
  548. 22:50only product product information and
  549. 22:53your uh your money right your Finance
  550. 22:56these three are continuously flowing how
  551. 22:58when you can ensure the continuous flow
  552. 23:00of these resources obviously when you
  553. 23:02are having fixed kind of demand and
  554. 23:05fixed Supply right you are pretty sure
  555. 23:08about your forecasting process your
  556. 23:10demand function and your supply function
  557. 23:13so in that way uh it should be a
  558. 23:15continuous kind of model right so
  559. 23:17material should flow continuously from
  560. 23:19the supplier to uh customer but what
  561. 23:23should be the objective okay first we'll
  562. 23:25take the examples uh for this continuous
  563. 23:28kind of model already we talked about so
  564. 23:31many all the industries related to you
  565. 23:33know commodity kind of product I you
  566. 23:36talk about grocery item usually
  567. 23:39continuous kind of model we can uh go
  568. 23:42for right or maybe uh fmcg products many
  569. 23:46products we can use a continuous kind of
  570. 23:48model steel industry continuously we are
  571. 23:50producing sugar industry salt industry
  572. 23:53these are the best example because as
  573. 23:55for the population we can fix this is is
  574. 23:58going to be the demand and we can go for
  575. 24:01that right so this is uh uh these are
  576. 24:04some of the examples now when you are
  577. 24:06saying you are sure with the demand and
  578. 24:08Supply so obviously the ultimate
  579. 24:10objective should be you should be very
  580. 24:12very efficient right so because
  581. 24:16otherwise what is there to compete the
  582. 24:19first thing is how
  583. 24:21efficiently how with the minimum cost
  584. 24:24you are providing that product or
  585. 24:25Services right so that should be the UL
  586. 24:28imate objective of your continuous kind
  587. 24:30of production system other
  588. 24:32characteristics just in time we can
  589. 24:33Implement because we are sure about the
  590. 24:35demand and Supply so we can just get the
  591. 24:37supplies continuously uh feed those
  592. 24:41supplies to the production lines and
  593. 24:43right we in that way we can reduce the
  594. 24:45inventory and inventory cost as well and
  595. 24:48waste also can be eliminated because now
  596. 24:51that waste which was we were generating
  597. 24:54earlier from the inventory while
  598. 24:55handling managing updating the inventory
  599. 24:57we were damaging the products in the
  600. 25:00inventory only sometime product were
  601. 25:02going obsolete so that waste we can
  602. 25:04reduce right so it is kind of smooth
  603. 25:06flow one piece flow kind of production
  604. 25:09system it is coming from one end leaving
  605. 25:11the other end so that is there
  606. 25:14advantages all those advantages we can
  607. 25:16minimize the cost we can be more
  608. 25:18efficient in that way productiv
  609. 25:20productivity will be improved right
  610. 25:23disadvantages basic disadvantage of
  611. 25:26continuous system is less flexible
  612. 25:29because we are not considering the
  613. 25:30dynamism of the environment because it
  614. 25:33is a continuous model and any disruption
  615. 25:36major disruption will interrupt the
  616. 25:38suppli sometimes will interrupt the
  617. 25:40demand sometimes right so that uh is the
  618. 25:43basic disadvantage if we'll talk about
  619. 25:45the Amazon they usually focus on this
  620. 25:48where type of model where they are
  621. 25:50continuously you know sourcing the
  622. 25:52product from the sellers and delivering
  623. 25:55the products at the minimum cost right
  624. 25:58so you can see uh this model is suitable
  625. 26:01for those business already I talked
  626. 26:03about the examples where you have stable
  627. 26:05demand and Supply you can see this is
  628. 26:08the standard shipping where you were
  629. 26:10having you were placing the order but
  630. 26:12your fulfillment center is far away then
  631. 26:15they are using some USP services to
  632. 26:17transport that product and finally here
  633. 26:20you are where you were getting the
  634. 26:22product right now the concept is same
  635. 26:24day delivery when you are very your
  636. 26:26fulfillment center is very near to your
  637. 26:29customer that is what I discussed in the
  638. 26:31initial slides right but then if you are
  639. 26:33near to the customer you are adding more
  640. 26:35responsiveness right but in that way
  641. 26:37cost efficiency will not be there
  642. 26:39because so many locations will be there
  643. 26:42you need to serve all those locations
  644. 26:44you are maintaining inventory at all
  645. 26:46those locations so inventory cost will
  646. 26:48get high but outboard Logistics you will
  647. 26:50you will reduce right and in that way
  648. 26:53somewhere you can manage in that model
  649. 26:55which you want type of product and then
  650. 26:57you your customer is ready to take same
  651. 27:00day delivery then yeah you know uh we
  652. 27:03cannot separate these two things at two
  653. 27:05different centers why to make multiple
  654. 27:07stoppage right so then it is ultimately
  655. 27:10adding to the cost so why don't we do
  656. 27:12this in one station and then crowd
  657. 27:14sourcing means local career Partners we
  658. 27:17can pick who are frequently deling here
  659. 27:19and there and we can collaborate with
  660. 27:21them and finally within same day
  661. 27:24delivery or 1 hour delivery you can go
  662. 27:26for second is fast mod model obviously
  663. 27:29this is obviously the speed is the main
  664. 27:32parameter of this and where you need
  665. 27:34quick delivery and timely response and
  666. 27:37Zara is the best example where they are
  667. 27:40not only quickly delivering the product
  668. 27:42but they are replenishing the new
  669. 27:44inventories with the old inventory right
  670. 27:47so we have discussed one case where the
  671. 27:51you know the the new trends whatever new
  672. 27:54fashion they are coming with the average
  673. 27:56of that industry is six to seven weeks
  674. 27:59but Zara is almost every other week they
  675. 28:03are changing the Trends they are coming
  676. 28:06up with the new products right so this
  677. 28:08fast model is best fit for those product
  678. 28:11which is having very limited Cy uh life
  679. 28:14cycle right if we talking about
  680. 28:15entertainment industry if today any
  681. 28:18movie or web series is launched it
  682. 28:20should be distributed fully wherever you
  683. 28:22want to distribute right it should not
  684. 28:24happen that now today you are launching
  685. 28:26it somewhere in the North then you're
  686. 28:28going to South Eastern part West this
  687. 28:30cannot happen right so this these kind
  688. 28:33of products which uh got very limited
  689. 28:35shelf life you need to distribute using
  690. 28:38your fast model right so and seasonal
  691. 28:41products also because those products
  692. 28:44maybe for four or 5 months season so
  693. 28:46within that time you need to ensure the
  694. 28:49raw material uh acquisition production
  695. 28:53and final consumption as well within
  696. 28:55those four five months right then we
  697. 28:57talk about efficient supply chain model
  698. 29:00so this is again we can uh extend the
  699. 29:03first model which was your continuous
  700. 29:05flow model uh we can relate it with that
  701. 29:08because here also we we uh Target a type
  702. 29:11of supply chain model which is you know
  703. 29:14which can minimize the uh cost right
  704. 29:17this is the only thing we are adding
  705. 29:19here efficiency right so when you are
  706. 29:21sure about the demand you are sure about
  707. 29:23the supply only thing you the fight is
  708. 29:26how efficiently you can deliver the
  709. 29:28product to the End customer from the
  710. 29:31suppliers right so that is that should
  711. 29:33be the priority so you can see uh here
  712. 29:36we keep priority on efficient efficient
  713. 29:39Inventory management and getting the
  714. 29:41most Auto production uh workers and
  715. 29:44Equipment right so that the productivity
  716. 29:47can be improved with minimum outputs you
  717. 29:50can get the maximum out input uh output
  718. 29:53right with minimum inputs you will get
  719. 29:55the maximum output this is how you can
  720. 29:57increase the the productivity so this is
  721. 29:59efficient model obviously the challenges
  722. 30:02are there to the efficient model because
  723. 30:04you cannot change the cost of the raw
  724. 30:05material and commodities whatever you
  725. 30:07are using and then capacity constants
  726. 30:10are also there maybe 24 hours into 7 you
  727. 30:13are running your plant even then you
  728. 30:15cannot manufacture more than 50 lakh
  729. 30:17units so then how you can you know deal
  730. 30:21with that capacity
  731. 30:23constant uh shall we come up with the
  732. 30:25new machine or new plant then again can
  733. 30:28be utilized that full capacity of the
  734. 30:30new machine right and some other
  735. 30:32challenges label shortage delays are
  736. 30:35there right so highly competitive
  737. 30:38sectors are the reasons why we need
  738. 30:40where you know almost products are
  739. 30:43similar kind of thing features you are
  740. 30:45providing so it becomes very very
  741. 30:48important that you provide efficiently
  742. 30:50with minimum cost that can become your
  743. 30:53one USP with the minimum cost you are
  744. 30:56providing the products to the customer
  745. 30:58so Zara we can go this is the best
  746. 31:01example is suiting for uh different
  747. 31:05cases you see when we have very short
  748. 31:08lead time this is the only lead time
  749. 31:11right if you'll see lead time is on y
  750. 31:13AIS so we should Source from the local
  751. 31:17markets like Spain Portugal or Morocco
  752. 31:20right so so that it can be shipped
  753. 31:23quickly right so items with high fashion
  754. 31:27components means which you are changing
  755. 31:29very frequently you need to ship
  756. 31:31immediately you have limited lead time
  757. 31:33items with reasonable lead time you can
  758. 31:36go for offshoring but nearby offshoring
  759. 31:39because that much time is not there
  760. 31:41maybe compared to this it is little
  761. 31:43higher but still we need to go for
  762. 31:47minimum maybe distance whatever we can
  763. 31:50uh you know manage up to that point and
  764. 31:52we can be those location can be
  765. 31:54somewhere cost efficient location or
  766. 31:56maybe some extra Advantage we are
  767. 31:58getting out of the that location in
  768. 32:00terms of technology in terms of skills
  769. 32:02we are getting in terms of the cost
  770. 32:05those can be there right if we are
  771. 32:07having that much lead time little higher
  772. 32:09lead time so then we can go for lowcost
  773. 32:12country like China India where we can
  774. 32:15get the cheap labor where we can get the
  775. 32:18cheap uh you know resources right all
  776. 32:20those resources and we are producing
  777. 32:22some you know raw material silk also
  778. 32:24there and then we have when more time
  779. 32:28all the time and then you can go for
  780. 32:30highly standardized kind of you know
  781. 32:33items and uh you can go anywhere in the
  782. 32:36world wherever you are finding the best
  783. 32:39locations in terms of quality cost
  784. 32:41availability of raw material
  785. 32:43availability of manow skills technology
  786. 32:45whatever is required so then you can
  787. 32:47permanently you can Source those product
  788. 32:49to uh those countries right so this is
  789. 32:52the best example you can understand
  790. 32:54agile model next is where you are are
  791. 32:58responsive to you know quickly adapt the
  792. 33:01changes in the market so Nike is doing
  793. 33:03it beautifully any changes are coming or
  794. 33:06recommendation are coming from the
  795. 33:07customer they are quickly amending the
  796. 33:09product right so aile model works on how
  797. 33:13quickly you are responding to the cust
  798. 33:16any changes in the scenario how that can
  799. 33:18happen when you your communication and
  800. 33:21collaboration network is very strong
  801. 33:23that any change is here you are uh you
  802. 33:26know uh you are sharing immediately with
  803. 33:29your supply chain stakeholders right so
  804. 33:32you can
  805. 33:34see uh agile kind of supply chain is
  806. 33:37required when you are dealing with those
  807. 33:39kind of products which where you are not
  808. 33:41sure about the demand where everyday
  809. 33:43renovation Innovation is happening with
  810. 33:45the product or process right so in that
  811. 33:47way the four characteristics are you
  812. 33:50need to align your process virtual
  813. 33:52integration with all the stakeholders
  814. 33:54and all the activities throughout the
  815. 33:55network a network was should be there
  816. 33:58and Market sensitivity you need to sense
  817. 34:01the market trends and then you can come
  818. 34:03up with that plan right so this can be
  819. 34:05only I told you agile model is only
  820. 34:08possible when you are jointly managing
  821. 34:11with your suppliers so how supplier can
  822. 34:14manage the inventory at some point of
  823. 34:16time right it's not only the
  824. 34:18manufacturer responsibility and then if
  825. 34:20you are changing the product design
  826. 34:22process design accordingly your
  827. 34:24suppliers need to supply the material
  828. 34:27custom configured model where we are
  829. 34:30providing the customizing Services right
  830. 34:32supply chain according to the specific
  831. 34:34customer needs so this is the best
  832. 34:36example always we talk about Dell where
  833. 34:39you go to Dell showroom you tell your
  834. 34:42specifications in terms of processor you
  835. 34:44want in terms of ram ram capacity
  836. 34:46storage speed processing speed you want
  837. 34:50which generation so uh you know
  838. 34:52processor you want all those
  839. 34:54requirements you can give and then
  840. 34:56through there you know customer uh
  841. 34:58customer uh configured model they will
  842. 35:01provide you that product right and how
  843. 35:04they are doing that it combines aile and
  844. 35:07continuous flow methodology right so
  845. 35:10they are buying all the raw material
  846. 35:13components from uh the various part of
  847. 35:15the world usually from the Asian
  848. 35:17countries and then they are as per the
  849. 35:20configuration you are giving they are
  850. 35:22assembling the product and providing you
  851. 35:24so this is direct kind of supply chain
  852. 35:27flexible model again kind of aile model
  853. 35:30flexibility where you are dealing with
  854. 35:32the you know weing customer demands
  855. 35:35anytime you need to change you that
  856. 35:37should be incorporated throughout your
  857. 35:39supply chain so part segmentation
  858. 35:42precise talking algorithms and flexible
  859. 35:44planning are some of the main components
  860. 35:47when you are talking about the flexible
  861. 35:49model so you cannot go for you know huge
  862. 35:52pile of inventory and then you are
  863. 35:54consuming slowly in the market maybe
  864. 35:56tomorrow scenario will be different and
  865. 35:58then you require another set of raw
  866. 36:01material another set of inventory so
  867. 36:03then how you will ensure the consumption
  868. 36:06of the inventory already you acquired so
  869. 36:08that flexible model doesn't work for
  870. 36:10those kind of items right and uh it's
  871. 36:13kind of you know you need to turn it on
  872. 36:15turn it off kind of pro thing and H will
  873. 36:19packet uh is the best example for this
  874. 36:22kind of flexible model where they are
  875. 36:24you know sensing the market conditions
  876. 36:27and recording the customer preferences
  877. 36:30so frequently and providing the flexible
  878. 36:33Supply Chain Solutions right another is
  879. 36:36your virtual supply chain model right
  880. 36:38which is you can consider the future
  881. 36:40supply chain model as well where we are
  882. 36:42taking the help of cloud computing and
  883. 36:44data analysis so uh AI iot system will
  884. 36:48be part of this the only purpose here is
  885. 36:51we have the greater visibility and
  886. 36:53communication the things I was talking
  887. 36:55about to be more efficient C is flexible
  888. 36:58what you need you need to share
  889. 37:00information quickly and Proctor and
  890. 37:02Gamble they are doing this they are
  891. 37:04sharing the information quickly and
  892. 37:06managing the minimum inventories right
  893. 37:08in that way because only when product is
  894. 37:10required they are shipping that product
  895. 37:13right so best practices for supply chain
  896. 37:16modeling you need to understand the
  897. 37:18business needs already we talked about
  898. 37:20different products required different
  899. 37:22types of supply chain if we are talking
  900. 37:23about steel industry Continuous Flow
  901. 37:26efficient supply chain if we talking
  902. 37:27about Healthcare emergency supply chain
  903. 37:30you need to go with an asile and
  904. 37:32flexible supply chain disaster
  905. 37:34management That's Entertainment kind of
  906. 37:36supply chain you need that uh you know C
  907. 37:39supply chain Speedy supply chain right
  908. 37:41choose appropriate approach so you need
  909. 37:45to pick the uh modeling method approach
  910. 37:48how you'll model those factors whatever
  911. 37:50you have figured out right and validate
  912. 37:53with the accurate data so it's not only
  913. 37:55once you picked the model it will be
  914. 37:56forever
  915. 37:57you need to validate the established
  916. 38:00model again and again right and you need
  917. 38:02to test all the scenarios what if that
  918. 38:05happens right what if it will go the
  919. 38:07other way we thought maybe in this way
  920. 38:09and it the some other factors came into
  921. 38:12picture we did not model those factors
  922. 38:14and now you know playing very important
  923. 38:16part right so then we can consider
  924. 38:19different models obviously we can
  925. 38:21involve the
  926. 38:22stakeholders when whatever model if you
  927. 38:24are going for aile kind of model you
  928. 38:26need to uh you know take the views from
  929. 38:29your stakeholders whether they are ready
  930. 38:31for that kind of flexible aile quick
  931. 38:33model or not regulate regularly you need
  932. 38:36to update and refine that model right
  933. 38:38already I talked about document
  934. 38:40assumptions see whenever you are
  935. 38:42developing any model there are
  936. 38:44limitations like we talked about linear
  937. 38:46programming and then we said that the
  938. 38:49independent variables are having linear
  939. 38:51relationship if you're talking about
  940. 38:53Simplex Mo method right where we are or
  941. 38:55Transportation method where we are
  942. 38:57talking talking about the linear you
  943. 38:59know relationship right so if those
  944. 39:02assumptions you are forgetting when you
  945. 39:04are implementing then your model will be
  946. 39:07then it will be a disaster right so you
  947. 39:09need to train and educate the people how
  948. 39:12they can use the best model and those
  949. 39:14best model can be tracked against the
  950. 39:17set of performance measures you have
  951. 39:18already defined obviously we have some
  952. 39:21challenges because complex
  953. 39:23relationships different stakeholders
  954. 39:25different activities it is very
  955. 39:28difficult to configure all those
  956. 39:29activities in one model but still we are
  957. 39:32trying to cope up with that and Define
  958. 39:34those eight components so that we can
  959. 39:37include parameters from all those things
  960. 39:39because these kind of models work only
  961. 39:42with the data you need data to validate
  962. 39:44right you need data to develop those
  963. 39:46models right so then how accurately you
  964. 39:49are getting timely information you are
  965. 39:51getting so that also Big Challenge
  966. 39:53multiple objectives because multiple
  967. 39:55organization so one organization may be
  968. 39:57competing on responsiveness other
  969. 39:59organization is competing on cost
  970. 40:01efficiency so then multiple organization
  971. 40:03multiple objectives so that can be
  972. 40:06another challenge Dynamic environment
  973. 40:08this because Dynamic modeling is
  974. 40:10required where everyday situation is
  975. 40:12changing you need to change your model
  976. 40:15as well integration issues are there
  977. 40:18because uh multi Supply chains are there
  978. 40:22and various stakeholders are there so
  979. 40:24then sometimes those conflicts can be
  980. 40:27there whether we want cost efficient we
  981. 40:29want responsiveness we want to manage
  982. 40:31inventory where the customer we should
  983. 40:34keep inventory centralized so those
  984. 40:36issues can be uh you know sometimes
  985. 40:39making decisions can be little difficult
  986. 40:41resource constants always we are working
  987. 40:44with the limited resources in terms of
  988. 40:46all the resources time money machine
  989. 40:48method material whatever we are using
  990. 40:50scenario complexity because these days
  991. 40:53we have multiclone networks and Omni
  992. 40:57Chan distribution multiclone Network
  993. 40:59where we are providing the distribution
  994. 41:01multiple distribution points from the
  995. 41:03distributor and or supplier end to the
  996. 41:06customer om Channel distribution where
  997. 41:08the customer can come from the multiple
  998. 41:10channels right like you can book air
  999. 41:13ticket through goo through make my trip
  1000. 41:16through exigo through your IRCTC through
  1001. 41:19the Indigo website or B whatever
  1002. 41:22Airlines you are picking right so that
  1003. 41:24scenario complexity is there risk
  1004. 41:26management
  1005. 41:28obviously because you are working in the
  1006. 41:29dynamic environment and that any change
  1007. 41:32either in all those pestal Dimension
  1008. 41:34political ethical legal technological
  1009. 41:37social all those environmental any
  1010. 41:39change in that environment will disrupt
  1011. 41:41your supply chain and how quickly you
  1012. 41:44will manage that CH change and how
  1013. 41:46efficiently you will manage that will
  1014. 41:48help you you know change management this
  1015. 41:51is the future of modeling supply chain
  1016. 41:53control Towers now this is the
  1017. 41:55combination of machine learning learning
  1018. 41:57artificial intelligence iot because now
  1019. 42:01we were talking about eight components
  1020. 42:03and we have seen under manufacturing so
  1021. 42:06many components can be there so many
  1022. 42:08model we are manufacturing within those
  1023. 42:10production lines on one assembly we are
  1024. 42:13making multiple models then we are
  1025. 42:15keeping the inventory for each model
  1026. 42:17each component packaging Distributing so
  1027. 42:20many different parameters how you will
  1028. 42:22keep the track of all those parameters
  1029. 42:24then we need these cloudbased Solutions
  1030. 42:27supply chain control Towers which will
  1031. 42:29take care of every parameter you need
  1032. 42:32information related to warehousing
  1033. 42:34whatever parameters you'll say we'll see
  1034. 42:36in the next session what are the
  1035. 42:38different you know parameters when we'll
  1036. 42:40talk about you know Transportation
  1037. 42:43facility inventory so all those
  1038. 42:46parameters you just say and supply chain
  1039. 42:48control tower will track those
  1040. 42:50parameters will give you the data now
  1041. 42:52you feed that data in your model and
  1042. 42:54you'll get the output right so if you'll
  1043. 42:57travel from here to the other point so
  1044. 43:01how much cost will be there how much
  1045. 43:02lead time is required when the end time
  1046. 43:05delivery will happen and all those
  1047. 43:07things you can figure out so this is a
  1048. 43:10small video on uh this uh the smart
  1049. 43:13solution we'll just go through this
  1050. 43:15video so you can just see that these
  1051. 43:17supply chain control Towers when because
  1052. 43:20when we are talking about different
  1053. 43:21types of mathematical modeling we'll go
  1054. 43:23for we need data for all those
  1055. 43:26parameters whatever you have set for
  1056. 43:28transportation right per unit uh
  1057. 43:30shipment cost right per unit
  1058. 43:33manufacturing cost Warehouse cap
  1059. 43:35capacity utilization different
  1060. 43:37parameters we are recording so this
  1061. 43:39supply chain control tower will help you
  1062. 43:41to record all those parameters and then
  1063. 43:44you can uh you know develop your best
  1064. 43:46fit model which model is best for your
  1065. 43:49type of product right so quickly we'll
  1066. 43:52go through the case studies first is
  1067. 43:54case study is about Intel who is the Lar
  1068. 43:57largest manufacturer of computer chips
  1069. 43:59the problem here I'm highlighting how
  1070. 44:01they they became more efficient right
  1071. 44:04earlier they were producing uh chips and
  1072. 44:07that chip were costing around $100 right
  1073. 44:10so they were spending almost
  1074. 44:12$5.5 per chip for transportation supply
  1075. 44:15chain cost right but now because they
  1076. 44:19are coming up with the new chips and it
  1077. 44:21is a low cost atom chip so which cost
  1078. 44:25around $20 so if it is costing $20 and
  1079. 44:29the shipment supply chain cost is still
  1080. 44:325.5 that is big question so then what
  1081. 44:35can be done so they analyzed all the
  1082. 44:37scenario and they came up with the
  1083. 44:40discussion this that inventory is
  1084. 44:42something which we can you know finally
  1085. 44:44reduce the cost but why before inventory
  1086. 44:47they worked with you know uh uh
  1087. 44:50packaging they scale down the level of
  1088. 44:52the packaging required for that so that
  1089. 44:55high value to weight r ratio can be
  1090. 44:57maintained packaging material can be
  1091. 44:59reduced already they did that right but
  1092. 45:02still the cost was around $5.5 per chip
  1093. 45:05right they already worked with the
  1094. 45:07distribution cost and they they know
  1095. 45:09know that now further it cannot be
  1096. 45:12reduced so only thing is we can reduce
  1097. 45:15the inventory and there we can save that
  1098. 45:18cost right so but to reduce the
  1099. 45:21inventory the basic problem was 9 week
  1100. 45:24order cycle if today you will place the
  1101. 45:27order after 9 weeks you will get the
  1102. 45:29order so that means minimum 9 to 10
  1103. 45:31weeks inventory you will keep that so
  1104. 45:33first point while in reducing an
  1105. 45:35inventory cost how we can bring this
  1106. 45:37cycle time down maybe somewhere two to
  1107. 45:40three weeks so then we'll maintain
  1108. 45:42inventory only for two to three weeks so
  1109. 45:44then they thought that okay we'll go for
  1110. 45:46make to order once we'll get the order
  1111. 45:48only then we'll make that right this is
  1112. 45:50one approach they opted for and then
  1113. 45:53they instead of you know cutting the
  1114. 45:55chip assembly test window from 5day
  1115. 45:58schedule to Y weekly 2 Day schedule
  1116. 46:01right so 3 days they cut there and then
  1117. 46:04they analyzed very frequently and
  1118. 46:07minutely their sales and operation
  1119. 46:10planning right so how they you know
  1120. 46:12sales is happening that uh throughput
  1121. 46:15rate how the end sale is happening in
  1122. 46:17the market right accordingly they
  1123. 46:20planned the production and then they
  1124. 46:21asked their vendors you keep the
  1125. 46:24inventory we don't want to keep the
  1126. 46:25inventory so this is how how they worked
  1127. 46:28on these two three parameters and then
  1128. 46:30you can see they reduced
  1129. 46:33$4 per unit for that atom chip which was
  1130. 46:37costing them 20 and you can just imagine
  1131. 46:41the the saving they they have done just
  1132. 46:43working on the inventory but minimizing
  1133. 46:46the
  1134. 46:47inventory again have some challenges
  1135. 46:50right so if you are minimizing the
  1136. 46:51inventory that means production
  1137. 46:53schedules are very very tight schedules
  1138. 46:55means small orders you producing so we
  1139. 46:58already know that if you are producing
  1140. 47:00in small orders production cost will be
  1141. 47:03higher because economy is of scale then
  1142. 47:05Transportation if you are shipping small
  1143. 47:08orders full capacity may not be utilized
  1144. 47:10then again economies of scale right will
  1145. 47:13be in question but yes then that's why
  1146. 47:15we have this m mathematical modeling
  1147. 47:17system we'll we will keep our data feed
  1148. 47:20our data and we'll get the best result
  1149. 47:22because you cannot count on fingers this
  1150. 47:25is best in this case this is better in
  1151. 47:27this case this is so that we cannot do
  1152. 47:29that so let us feed all the data in that
  1153. 47:31system and we can go for that another
  1154. 47:34quickly case of pharmaceutical industry
  1155. 47:37and you know that pharmaceutical
  1156. 47:39industry you know everyday scenario
  1157. 47:41where Acquisitions are happening and
  1158. 47:43divestment studies is are happening
  1159. 47:45every day so this is one organization
  1160. 47:48which is expanding by you know baning
  1161. 47:50with other organization and uh keeping
  1162. 47:53out their known uh you know core
  1163. 47:55businesses and that non Core Business is
  1164. 47:57one of is your distribution Network and
  1165. 48:00then they suddenly realized okay this is
  1166. 48:02going very inefficient right and
  1167. 48:04fragmented way we need to organize this
  1168. 48:07how we can reduce cost enhance customer
  1169. 48:09services and establish a reusable
  1170. 48:12modeling tool which can automatically
  1171. 48:15you know model the scenario and will
  1172. 48:17give you the best option so we are doing
  1173. 48:19fairly well with the manufacturing as
  1174. 48:21that is our Core Business activity but
  1175. 48:24we need to work on the distribution
  1176. 48:26Network right so they used mixed integer
  1177. 48:29linear programming problem where they've
  1178. 48:32model all those spectors which were
  1179. 48:33require required like manufacturing
  1180. 48:36sites how many sites where the location
  1181. 48:38they will decide distribution centers
  1182. 48:40again location how many required demand
  1183. 48:43from which reason demand is coming what
  1184. 48:45are the demand pattern aggregated
  1185. 48:47product groups right so they in included
  1186. 48:50all those products and then they
  1187. 48:51included the global as well as your uh
  1188. 48:56local business business levels right so
  1189. 48:58then they model that and you can see the
  1190. 49:02result indicated significant Improvement
  1191. 49:05and 10% reduction in the overall cost
  1192. 49:08and next day delivery they ensured in
  1193. 49:1195% of the products right just working
  1194. 49:15on their distribution Network how they
  1195. 49:17can model using mixed integer uh your
  1196. 49:20linear programming model right where
  1197. 49:22they fed all this data and then they
  1198. 49:25reduced the overall cost cost so despite
  1199. 49:28this because obviously when we are
  1200. 49:30talking about you know linear
  1201. 49:32programming and all that getting data
  1202. 49:34from different sources different
  1203. 49:36stakeholders and then you know uh then
  1204. 49:39you are so frequently recommending the
  1205. 49:41changes and we are always we are as a
  1206. 49:44human being we are you know first we are
  1207. 49:46resisting to the change so that is one
  1208. 49:49Challenge and other challenges in terms
  1209. 49:51of how you will take care of the data
  1210. 49:53coming from different stakeholders
  1211. 49:55different activities right so then you
  1212. 49:57have to make the tradeoff right so
  1213. 49:59decision makers to understand tradeoffs
  1214. 50:01and make informed decisions you can make
  1215. 50:04informed decision when you have that
  1216. 50:06information which is you can easily
  1217. 50:08record through your supply chain Towers
  1218. 50:11right so uh we can here we can conclude
  1219. 50:15that modeling system will help you to
  1220. 50:19simulate all the different scenarios
  1221. 50:21what can be different outputs what are
  1222. 50:23the possibility of getting the success
  1223. 50:26or
  1224. 50:27and how the environment will behave all
  1225. 50:29the environmental factors you can model
  1226. 50:31into that right so this is particular
  1227. 50:33thing but then you need to feed regular
  1228. 50:36data it's not onetime fixed model
  1229. 50:39regularly you need to feed the data from
  1230. 50:42where you can get that data already we
  1231. 50:44talked about your supply chain Tower
  1232. 50:46solution control tower where you know
  1233. 50:48the virtual word is there for all the
  1234. 50:50physical items you have right so
  1235. 50:52anywhere you are depleting inventory it
  1236. 50:54can record quickly right anywhere you
  1237. 50:57are damaging the product it can be
  1238. 50:59quickly replenished re uh it can be
  1239. 51:01shared throughout the network any
  1240. 51:04customer complaint is coming because of
  1241. 51:06Any defect can be quickly shared with
  1242. 51:08the manufacturing process right so with
  1243. 51:11this uh we end this that this modeling
  1244. 51:14system will help you to improve the
  1245. 51:16efficiency as well as the responsiveness
  1246. 51:18of the overall supply chain so these are
  1247. 51:21the references for further reading so
  1248. 51:24that's all thank you very much

About this transcript

This page contains the full transcript of Lecture 28 : Supply Chain Models and Modelling Systems by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 8,300 words across 1,248 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.