  3. 0:25so hello dear students welcome back to
  4. 0:27nptl online course on Logistics and
  5. 0:29Supply Chain management I'm Dr vikas
  6. 0:32takur assistant professor Department of
  7. 0:34humanities and social sciences IIT kakur
  8. 0:37so today in this journey we'll discuss
  9. 0:39today about the some of the challenges
  10. 0:42which maybe as supply chain manager will
  11. 0:44face right in terms of uncertainties
  12. 0:47right which may be posed from the
  13. 0:49customer end where we are consuming the
  14. 0:51final product or maybe it can come these
  15. 0:54uncertainties can be from the supply end
  16. 0:57so complete supply chain perspective
  17. 0:59we'll see what are the different
  18. 1:01challenges in terms of Uncertain
  19. 1:03situations which we are put into and
  20. 1:05then how we can deal with those some
  21. 1:08some of the mitigating strategies we'll
  22. 1:09discuss right and then we'll talk about
  23. 1:12uh again the supply chain macro
  24. 1:14processes uh keeping three stakeholders
  25. 1:18in mind first is your supplier then
  26. 1:20manufacturer and then the customer so uh
  27. 1:23among the interaction if we'll talk
  28. 1:25about among these uh three stakeholders
  29. 1:27we'll see what are those macro process
  30. 1:29processes we are handling when we are
  31. 1:31talking about the complete Supply Chain
  32. 1:33management as macro processes right so
  33. 1:37uh uh if I'll just randomly ask you
  34. 1:41about any if you are supply chain
  35. 1:44manager and we are asking about when we
  36. 1:46will replenish the inventory right maybe
  37. 1:49on the road you are having all the data
  38. 1:51stats with you that uh maybe five lots
  39. 1:54are coming from different suppliers
  40. 1:56right if I'll ask you the exact location
  41. 1:59maybe you can specify the exact location
  42. 2:01where are the goods right now but if
  43. 2:03I'll ask you the exact time when we'll
  44. 2:06receive those goods maybe that 100%
  45. 2:08accuracy may not be there because Still
  46. 2:11You can predict that maybe within that
  47. 2:13time we will receive the goods but we
  48. 2:15are never 100% sure right same is the
  49. 2:18case when I'm talking about the quality
  50. 2:20of those goods being transported from
  51. 2:23point A to location B right so then also
  52. 2:26because during that Transportation or
  53. 2:28handling in the warehouses maybe we we
  54. 2:31might have damaged some of the products
  55. 2:33if the initially we shifted 1,500 units
  56. 2:37all 1500 units with the you know
  57. 2:39promised quality are reaching to the End
  58. 2:42customer that again we are not sure and
  59. 2:44then some kind of maybe disruption in
  60. 2:46terms of uh recently we have seen
  61. 2:49covid-19 pandemic where the complete
  62. 2:52supply chain was disrupted because of
  63. 2:54the shutdown right so then again the
  64. 2:57availability of the raw material
  65. 2:59finished Goods factories were shut down
  66. 3:01worker moved from those location to
  67. 3:04their Villages so that is again kind of
  68. 3:06UNC uncertain situation right so how we
  69. 3:11can deal with these kind of Uncertain
  70. 3:13situation either happening from the
  71. 3:15customer side in terms of demand
  72. 3:17uncertainty or happening from the
  73. 3:19supplier side in terms of Supply
  74. 3:21uncertainty so whenever we are talking
  75. 3:24about uncertainty these two points we
  76. 3:26need to keep in mind because always in
  77. 3:28supply chain manage M the primary fight
  78. 3:31is to meet the demand with your supplies
  79. 3:34Whenever there is uncertainty with the
  80. 3:36demand or uncertainty with the supply so
  81. 3:39definitely challenges we are going to
  82. 3:41face so how the very first uh solution
  83. 3:45that comes to our mind is that let us
  84. 3:47keep some extra safe inventory in our
  85. 3:49retail outlet right so that any customer
  86. 3:52visits our showroom can get the
  87. 3:55inventory right can get the product so
  88. 3:57this is one way out but yes then how
  89. 4:00much inventory you will keep but then
  90. 4:03maybe for tomorrow you are predicting
  91. 4:05the cyclone and maybe for next 10 days
  92. 4:08or maybe 10 months there is no Cyclone
  93. 4:11so then what you will do with that extra
  94. 4:12inventory so that also you know uh the
  95. 4:16chances of getting that inventory
  96. 4:18obsolete is also very important point
  97. 4:21and then sometimes what is happening you
  98. 4:23are uh because of that end season sales
  99. 4:26are there and then you are selling the
  100. 4:27same inventory at the reduced price so
  101. 4:30these are some of the challenges when we
  102. 4:31are talking about the uncertain
  103. 4:33situations right and in supply chain
  104. 4:36these uncertain situations can arise
  105. 4:38either from the supply end or from the
  106. 4:41customer end in terms of demand let us
  107. 4:43first talk about the supply chain
  108. 4:46uncertainty obviously when we are not
  109. 4:49sure about the what see suppliers are
  110. 4:53when very prominent stakeholder of any
  111. 4:56supply chain from where the supply is
  112. 4:58coming right so so the very basic
  113. 5:00purpose of supply chain is to ensure the
  114. 5:04smooth supply of the uh raw materials to
  115. 5:07the production line right so that means
  116. 5:10when it is unpredictable situation or
  117. 5:12volatility is there so that means you
  118. 5:15cannot predict the situation 100% right
  119. 5:18so anything can go wrong with the
  120. 5:20supplier maybe for with the one supplier
  121. 5:23or maybe with the multiple suppliers
  122. 5:25right so then how you will respond
  123. 5:27during that situation like we quoted the
  124. 5:28example of 19 outbreak right so there
  125. 5:32can be natural disaster there can be
  126. 5:34man-made disaster so in nutshell we can
  127. 5:37say these factors demand fluctuations
  128. 5:41Logistics disruptions labor shortage
  129. 5:43geographical uh any event is occurring
  130. 5:47right so these are some of the factors
  131. 5:49which can interrupt your supply chain
  132. 5:51smooth supply chain right so in terms of
  133. 5:54supply chain manager our responsibility
  134. 5:57is how we can ensure the smooth Supply
  135. 5:59of the raw material right or whatever
  136. 6:02component we are using to produce that
  137. 6:04finished good finished product right so
  138. 6:08let us keep we'll discuss four scenarios
  139. 6:10Supply
  140. 6:11uncertainty uh on uh the row side and
  141. 6:14demand uncertainty on the column side
  142. 6:17see one very ideal situation is when we
  143. 6:21have low Supply uncertainty that means
  144. 6:25you are pretty sure about the supply
  145. 6:28that you can maintain the smooth supp
  146. 6:29Supply and then low demand uncertainty
  147. 6:33that means you are into a market kind
  148. 6:36where maybe you are dealing with those
  149. 6:38products where you have the continuous
  150. 6:40Supply continuous demand like we counted
  151. 6:43sugar industry salt industry seed uh
  152. 6:45steel industry cement industry those
  153. 6:48kind of goods where you know continuous
  154. 6:50Supply is there so in that case if this
  155. 6:53is the kind of industry what is the
  156. 6:55primary focus of any supply chain is to
  157. 6:58be efficient because there is nothing uh
  158. 7:02much you can do with the product in
  159. 7:03terms of innovation right cement
  160. 7:06industry will provide all same packet
  161. 7:08size right and same quality almost same
  162. 7:11quality and it is very difficult as a
  163. 7:13lemon maybe customer you cannot analyze
  164. 7:15the quality right so then what you will
  165. 7:18do with you know in terms of USP your
  166. 7:21USP lies majorly how efficient you are
  167. 7:24while you are pricing your product right
  168. 7:27so pricing is very very important in
  169. 7:29this this situation first scenario
  170. 7:31second scenario where we have still uh
  171. 7:34stable Supply but we are not sure about
  172. 7:37the demand high demand uncertainty right
  173. 7:40in terms of if you are coming with the
  174. 7:42new mobile phones right so only thing
  175. 7:44component are same sometimes you are
  176. 7:46adding some new features adding some new
  177. 7:48apps software so that way you are
  178. 7:50Innovative in that way right but in that
  179. 7:53case your supply chain should be very
  180. 7:54very responsive quickly you should
  181. 7:56respond to the customer demand that can
  182. 7:59come from anywhere right so high demand
  183. 8:02uncertainty from particular C uh uh
  184. 8:05Market maybe demand is coming and for
  185. 8:07next 10 days there is no demand from the
  186. 8:10same market and some other location we
  187. 8:12are getting high demand right so in that
  188. 8:14case how supply chain can respond very
  189. 8:17quickly the third scen this is the
  190. 8:19second scenario third scenario is where
  191. 8:22we have high Supply uncertainty but
  192. 8:26demand is still very stable right but
  193. 8:29Supply we are not sure so in that case
  194. 8:31what we can do like we talk about
  195. 8:34semiconductors in these days you might
  196. 8:36have seen the demand for the automobile
  197. 8:39industry is almost saturated with all
  198. 8:41the players right there are maybe some
  199. 8:44fluctuations are there but still they
  200. 8:45can figure out how much is the demand
  201. 8:47but if you talk about the uh recent news
  202. 8:50was there and now Indian government also
  203. 8:52started establishing semiconductor two
  204. 8:54or three location they have identified
  205. 8:56where they are planning to set up the
  206. 8:58semiconductor plant right so in that
  207. 9:00case because uh the news I was talking
  208. 9:04about more than 50 lakh units were uh
  209. 9:07with the manufacturers maruti Hyundai
  210. 9:09toota all those manufacturers but they
  211. 9:12were not able to sell because of the
  212. 9:14shortage in the chip right so then in
  213. 9:17that case what you can do risk hedging
  214. 9:20may be the best option for managing your
  215. 9:22supply chain where you can pull your
  216. 9:24resources if same Industries maybe many
  217. 9:26players are there they can pull their
  218. 9:29resources to meet that uh kind of
  219. 9:32saturated demand and last fourth case is
  220. 9:36where your supply is very uncertain your
  221. 9:38demand is very uncertain this is the
  222. 9:41biggest challenge when you are not sure
  223. 9:43about anything right then the AAL supply
  224. 9:46chain will help how flexible you are
  225. 9:49with your supply chain if demand is
  226. 9:51suddenly coming from one end how you can
  227. 9:54meet with the uh you know minimum
  228. 9:56consumption of the resources because
  229. 9:58meeting demand requires supplies right
  230. 10:01but we are not sure about the supplies
  231. 10:03as well so then those kind of you know
  232. 10:05Industries we have to be uh we have to
  233. 10:08come up with your agile supply chain
  234. 10:10let's talk about Healthcare supply
  235. 10:12chain maybe the Emergency Services you
  236. 10:15are providing with the ambulance maybe
  237. 10:17you are providing the different uh you
  238. 10:20know blood groups right and then Supply
  239. 10:23is also uncertain in that case whether
  240. 10:25you are maintaining those all the blood
  241. 10:27groups or not and then demand when you
  242. 10:29need how many bottle units you need
  243. 10:31right that also is very very uncertain
  244. 10:34so in that kind of situation in
  245. 10:36healthcare supply chain is Healthcare
  246. 10:38supply chain is usually we talk about
  247. 10:40emergency supply chain or you can talk
  248. 10:42about not only Healthcare supply chain
  249. 10:44disaster supply chain disaster relief
  250. 10:47operations from where how many first
  251. 10:50thing is we need to locate how many
  252. 10:51people are affected then we need to
  253. 10:53ensure the minimum supplies with the
  254. 10:55medicines next minimum Supply how they
  255. 10:57can survive for maybe eight or 10 10
  256. 10:59days then the rescue operation will
  257. 11:01happen so we need to supply them the
  258. 11:04medicines and the bread packets and all
  259. 11:07that that they can survive right so
  260. 11:09these are four different scenarios we'll
  261. 11:11discuss when we'll discuss about the
  262. 11:13uncertainty throughout your supply chain
  263. 11:16right talking about demand uncertainty
  264. 11:19refers to unpredictability and
  265. 11:21variability coming from the customer
  266. 11:23side so sometimes you are keeping that
  267. 11:26much stock you stocked in 2020 you
  268. 11:29forgot to use that and still that
  269. 11:31inventory is with is with you but it's
  270. 11:34it's not coming with the you know
  271. 11:35deadline or maybe uh expiry date so you
  272. 11:39are using somewhere in 2050 but that
  273. 11:42inventory is now you are counting that
  274. 11:44it is consumed but it is still with the
  275. 11:46customer that can also happen right if
  276. 11:48those kind of products are there so but
  277. 11:50demand variability usually coming from
  278. 11:52the customer side and why it is
  279. 11:54happening because of Market Trend
  280. 11:56suddenly if there is change in the
  281. 11:57market Trend obviously custom customer
  282. 11:59focus will shift to some other
  283. 12:01Alternatives consumer behavior is also
  284. 12:03very unpredictable sometime you are
  285. 12:05going maybe you are feeling that next 2
  286. 12:07three months you will be very busy let
  287. 12:09us stock all the grocery items in the
  288. 12:11house so that next 2 three months I'll
  289. 12:13not get the time to visit the uh retail
  290. 12:16shop right so that way you are
  291. 12:17maintaining extra stock but usually you
  292. 12:19are not buying for more than 8 or 10
  293. 12:22days or 15 days inventory so then your
  294. 12:24behavior in that way can be you know
  295. 12:26very complex to predict economic
  296. 12:29conditions so suddenly if there is a
  297. 12:31recession buying power purchasing power
  298. 12:34of the customer will reduce so that also
  299. 12:36we need to take care when during covid
  300. 12:39only that happened that most of the
  301. 12:41automobile industry they faced huge
  302. 12:44crisis in terms of managing the demand
  303. 12:46because of the very low Demand right and
  304. 12:49then external events are always there
  305. 12:52which can affect your Demand right
  306. 12:54implied demand uncertainty is uh
  307. 12:58different from the demand and cty where
  308. 13:00we are talking about the special thing
  309. 13:03the special promise we are meeting and
  310. 13:06we are promising to our customer right
  311. 13:08where you are providing the Emergency
  312. 13:09Services let us talk about uh say uh we
  313. 13:13need ambulance services right I'm I'm
  314. 13:16having one uh taxi right so maybe first
  315. 13:20scenario is I'm using it as maybe taxi
  316. 13:23right or second is I'm using it as
  317. 13:25ambulance right so then using Taxi still
  318. 13:29the uncertainty is there maybe for whole
  319. 13:31day you are not having even single ride
  320. 13:33and then maybe for the next uh 12 hours
  321. 13:36you are getting multiple rides right so
  322. 13:38how you will manage as long as you you
  323. 13:40are having only single taxi right how
  324. 13:43you cannot manage maybe you can hedge
  325. 13:45with the other uh hedging supply chain
  326. 13:48you can go for where you can pull the
  327. 13:50resources you can get the taxes from
  328. 13:52your other uh players in the market and
  329. 13:55then this is how you can meet the
  330. 13:57customer demand but let's talk about the
  331. 13:59second scenario where we are talking
  332. 14:01about the ambulance where any this
  333. 14:04uncertainty is at the highest level and
  334. 14:07because we are promising Services during
  335. 14:09emergency only when we will call uh
  336. 14:13ambulance when we don't want to wait
  337. 14:15even for 5 minutes but in case of Taxi
  338. 14:18you can wait for 1 hour right you can
  339. 14:20wait for half an hour if you're planning
  340. 14:22for long journey so you can wait you
  341. 14:24have fall taxi person and then he took
  342. 14:2630 minutes extra then you took maybe 15
  343. 14:2920 minutes extra to board on taxi and
  344. 14:31all those things right so that in that
  345. 14:33way it is not that kind of Emergency
  346. 14:35Services but implied demand uncertainty
  347. 14:38when you are promising you are actually
  348. 14:41uh referring to that portion of the
  349. 14:43demand which is you know very very
  350. 14:46uncertain and kind of emergency services
  351. 14:49so if talking about that order frequency
  352. 14:52is also not sure lead time is very less
  353. 14:55quickly you need to respond fire
  354. 14:57Services right so so that people will
  355. 15:00get the minimum time right to deliver uh
  356. 15:04to you know uh provide the fire services
  357. 15:07and then Services level also expected
  358. 15:09are you know in terms of services level
  359. 15:12different varied Services level are
  360. 15:14expected from the customer so this is
  361. 15:16very important in terms of implied
  362. 15:18demand uncertainty so uh talking about
  363. 15:22emergency orders and long lead time so
  364. 15:24this if long lead time is there we'll
  365. 15:26talk about demand uncertainty
  366. 15:32if your emergency orders are there we'll
  367. 15:35talk about your this implied demand
  368. 15:37uncertainty so this is the basic
  369. 15:39difference because we have very short
  370. 15:42time to respond to that query to respond
  371. 15:44to that you know the demand coming from
  372. 15:47the market right but in case of the
  373. 15:49other supply chain where we have long
  374. 15:51lead time still we can take some time to
  375. 15:53respond like uh if you are placing order
  376. 15:56with the zomato right even they are
  377. 15:58promising fast delivery but they have 30
  378. 16:0045 minutes 1 hour sometimes right they
  379. 16:02can delay those Services bad weather
  380. 16:05condition they can reflect and then they
  381. 16:07can ask the customer to wait for maybe
  382. 16:08little longer hardly matters but in case
  383. 16:11of emergency services disaster
  384. 16:13management supply chain you have to be
  385. 16:16very quick uh to provide those emergency
  386. 16:18services so impact of services level as
  387. 16:21the services level will increase implied
  388. 16:24demand uncertainty will replicate in the
  389. 16:26same way will increase like anything so
  390. 16:28so that also you need to see if you are
  391. 16:31providing the services through different
  392. 16:33channels right so again the implied
  393. 16:35demand certainty will increase because
  394. 16:38now it's not only you need to cater to
  395. 16:40the demand coming from one channel if
  396. 16:42you're selling tickets if you're airline
  397. 16:45industry selling ticket from your
  398. 16:46through your maybe your own website
  399. 16:48through make my trip through go through
  400. 16:50exigo through IRCTC all those different
  401. 16:54channels are there so in that way imply
  402. 16:56demand uncertainty will be higher so
  403. 16:59let's talk about the supply uncertainty
  404. 17:02already we introduced a little bit about
  405. 17:04how it can be
  406. 17:06unpredictable uh during your
  407. 17:09uh when we are interacting with the
  408. 17:12suppliers right so what can be the
  409. 17:14factors capability of uh the supply
  410. 17:17chain and life cycle position very
  411. 17:19important when we are talking in terms
  412. 17:21of Supply uncertainty let's talk about
  413. 17:23the capability of the supply chain
  414. 17:25capability in Layon terms capability how
  415. 17:28cap your supply chain is to you know
  416. 17:31meet all the demand coming from the
  417. 17:33customer end whether it is variability
  418. 17:36is there in the demand whether quality
  419. 17:38level expected is different from
  420. 17:40different customers some are looking for
  421. 17:43superior quality some are looking for
  422. 17:45maybe the superior pricing policy some
  423. 17:48are looking for maybe variety so how
  424. 17:50your supply chain is capable enough to
  425. 17:53meet all those you know
  426. 17:56uh different kind of Demands coming from
  427. 17:59the customer with the so how you can
  428. 18:02meet that first is your production
  429. 18:04process second is your eeld quality e so
  430. 18:08how quickly your production process will
  431. 18:11respond to change in the market demand
  432. 18:14and how quickly you are shifting from
  433. 18:15model one to model two let's say now
  434. 18:18there is high demand for model two you
  435. 18:20will stop model one model 3 Model four
  436. 18:22and you will suddenly change over to the
  437. 18:25model two because there is more demand
  438. 18:27coming for that particular model right
  439. 18:28right then quality is how efficiently
  440. 18:32effectively you are converting the raw
  441. 18:34material into the finished one right and
  442. 18:37ensuring the final quality so once you
  443. 18:39will stabilize in that market
  444. 18:42standardize your production process your
  445. 18:44quality will improve automatically but
  446. 18:46if you are coming initially with you
  447. 18:48know new product design new process
  448. 18:50design then in that case it will take
  449. 18:52little time to standardize that process
  450. 18:55so that's why we always talk about in
  451. 18:57production operation management it is
  452. 18:59very very important to reach that
  453. 19:01standardization of the production
  454. 19:02process as early as possible so that the
  455. 19:06rejection Pro processor rejection can be
  456. 19:08reduced raw material rejection can be
  457. 19:11reduced in that terms life cycle life
  458. 19:15cycle position of the product see so
  459. 19:17life cycle everyone knows that this is
  460. 19:19the life cycle right where we are
  461. 19:21talking about the introduction stage we
  462. 19:23are talking about here the growth stage
  463. 19:25here we are talking about the maturity
  464. 19:28and then finally our product declines so
  465. 19:31just quickly I'll relate this life cycle
  466. 19:34position and how it is putting uncertain
  467. 19:36situation through the supply chain see
  468. 19:38this introduction stage if I'll
  469. 19:40characterize that means you are very
  470. 19:42very
  471. 19:43uncertain not only with demand but as
  472. 19:46well as your Supply right so because
  473. 19:49just now you introduced the new product
  474. 19:51you are not sure about the demand from
  475. 19:53which market demand will come and then
  476. 19:56because you are still standardizing in
  477. 19:58the process of standardizing your raw
  478. 20:01material components your process design
  479. 20:03so your supply is also not sure and you
  480. 20:06are also not sure how many vendors you
  481. 20:08need to develop whether that particular
  482. 20:10product will be success or failure so
  483. 20:13then you cannot suddenly go for multiple
  484. 20:15vendors right so in that way it is very
  485. 20:18uncertain so obviously in that case you
  486. 20:21have to be very responsive in your
  487. 20:23supply chain why I'm saying responsive
  488. 20:26when you'll go somewhere here you should
  489. 20:27be efficient cost efficient but when you
  490. 20:30are at the introduction stage you need
  491. 20:33to be responsive that means if demand is
  492. 20:36coming from anywhere you need to respond
  493. 20:39quickly right so that means cost will be
  494. 20:42little higher in terms of we are not
  495. 20:44sure about the demand in terms of we are
  496. 20:46not sure about the supplies that maximum
  497. 20:49inventory we are maintaining
  498. 20:50standardization is not done of the
  499. 20:52process so that means cost of production
  500. 20:55productivity will be low when
  501. 20:57productivity will be low that that means
  502. 20:58cost of production will be higher so
  503. 21:01that means the pricing will be little
  504. 21:03higher okay so because you need to
  505. 21:05recover the R&D cost as well so that you
  506. 21:08need to consider because as soon as you
  507. 21:10will get go into the growth stage other
  508. 21:13players will come into picture
  509. 21:14competition will be there in that case
  510. 21:16you need to lower down the cost you need
  511. 21:19to lower down the price as well right so
  512. 21:22till this point you need to ensure that
  513. 21:24you have recovered all the R&D cost
  514. 21:27including the profit margin as well that
  515. 21:29also you need to ensure right and once
  516. 21:31you will go into maturity stage now your
  517. 21:34processes are standardized demand is in
  518. 21:36that way saturated Supply is saturated
  519. 21:39you can forecast You can predict how
  520. 21:41much customer share is there if you're
  521. 21:43maintaining somewhere around 15 to 177%
  522. 21:45customer share so you you see
  523. 21:47fluctuation maybe 1 to 2% right so that
  524. 21:50much you are sure about the supply so in
  525. 21:52that way you can be efficient so when
  526. 21:54you are going to maturity stage you need
  527. 21:56to be efficient you need to be more cost
  528. 21:59efficient and quality also you need to
  529. 22:01promise imply demand uncertainty already
  530. 22:03I discussed if there is imply demand
  531. 22:06uncertainty so that will that effect
  532. 22:09will be replicated in the supply as well
  533. 22:11how many ambulances are required maybe
  534. 22:13at the same time then three calls are
  535. 22:15coming all cases are equally important
  536. 22:18so to whom you will address the first so
  537. 22:20that will pose extra you know challenge
  538. 22:23for this so how we can counter supply
  539. 22:26chain uncertainty first thing is we need
  540. 22:28to diversify the suppliers that means
  541. 22:30multiple suppliers different
  542. 22:32geographical location already in one
  543. 22:34session I discussed about uh single
  544. 22:37supplier m versus multiple supplier if
  545. 22:40anything goes wrong in that geographical
  546. 22:42location any disaster like Cloud
  547. 22:45bursting or flood is coming earthquake
  548. 22:47is there so that means your supply chain
  549. 22:49in interrupted right so then you need to
  550. 22:52locate different locations right
  551. 22:55sometime what is happening you are
  552. 22:56locating your supply uh your partner
  553. 23:00overseas as well when you are going
  554. 23:01overseas maybe some overseas is required
  555. 23:05maybe you are getting cheaper product uh
  556. 23:08with a lesser cost and then maybe
  557. 23:10quality is another one maybe technology
  558. 23:14is another one quality level is high
  559. 23:16technology is another Factor you are
  560. 23:18buying from the overseas player right so
  561. 23:21but this is long supply chain so but you
  562. 23:24can't replace all the suppliers with the
  563. 23:27overseas player what if that overseas
  564. 23:29supply chain interrupted right so one
  565. 23:32maybe one or two local vendors I will
  566. 23:34maintain who can ensure the smooth
  567. 23:36Supply during that time but when I'm
  568. 23:38sure about the supply and demand and
  569. 23:41that much Big Lot is required obviously
  570. 23:43I'll go over seas from where I can
  571. 23:45negotiate the cost quality and
  572. 23:48technology and performance all those
  573. 23:49things enhance visibility if you are you
  574. 23:53know real time data is provided by
  575. 23:55tracking your inventory by whatever
  576. 23:58action you are activity you are
  577. 24:00performing at different stages of that
  578. 24:02supply chain right then you can in that
  579. 24:04way reduce the uncertainty why
  580. 24:06uncertainty is there in the supply chain
  581. 24:09because we don't have the full
  582. 24:10information either we are dealing with
  583. 24:12the partial information wague
  584. 24:15information uncertain information right
  585. 24:18if that can be let's say how we are
  586. 24:20tracking right now is that this much
  587. 24:23demand is coming from the customer okay
  588. 24:2450 units let us place the order for 55
  589. 24:27units right then let us manufacture
  590. 24:29maybe 60 units let us place the order
  591. 24:31with the supplier for 70 units so this
  592. 24:33is how your demand is still 50 but you
  593. 24:36are placing order for 70 units how we
  594. 24:38can electronically we can change that so
  595. 24:40can so that that visibility can be
  596. 24:43maintained build flexibility so that we
  597. 24:46need to ensure while storing the
  598. 24:48inventory and agile manufacturing
  599. 24:51practices fostering collaboration so
  600. 24:53this aile manufacturing can only happen
  601. 24:55if I'm asking my supplier quickly Supply
  602. 24:58five units he's ready to supply five
  603. 25:00units now I need 50 units he's ready to
  604. 25:02supply 50 units now change over to
  605. 25:04Second model he's ready to change over
  606. 25:06to the second model so that you know
  607. 25:08collaboration with the supplier is
  608. 25:10required and that is only when you can
  609. 25:12strengthen the relationship with the
  610. 25:14stakeholders communication trust and
  611. 25:17collaboration it's not only the problem
  612. 25:19with the manufacturer the seller it's
  613. 25:21problem if something uncertain situation
  614. 25:24is there you need to deal with that
  615. 25:26uncertain situation throughout the
  616. 25:28network suppliers distributor your
  617. 25:31manufacturer Warehouse all those agent
  618. 25:34need to work in line right and then
  619. 25:36Implement risk management practices to
  620. 25:39manage risk first is you need to assess
  621. 25:42the risk then scenario planning maybe
  622. 25:44multiple Alternatives you will see what
  623. 25:46are the different scenarios if you'll go
  624. 25:48with root a what what can happen if
  625. 25:50you'll go with root b c d then what are
  626. 25:53the different you know uh Alternatives
  627. 25:56and what will be the different outcomes
  628. 25:57and then we will we can find out the
  629. 25:59chances of happening something right
  630. 26:01probability Theory right we can find out
  631. 26:03that so that invest in resilience how we
  632. 26:06need to invest more and more in to
  633. 26:08develop that robust infrastructure so
  634. 26:10that we can back uh come up with the
  635. 26:13backup inventory backup location backup
  636. 26:15manufacturing so that can be supported
  637. 26:18Monitor and adapt we need to monitor the
  638. 26:20supply chain performance regularly with
  639. 26:22the changing Dynamic that market
  640. 26:24scenario right and we need to tap the
  641. 26:27external factors as well which can come
  642. 26:29and play important role right already we
  643. 26:32talked about we can conclude this that
  644. 26:33improve visibility and communication
  645. 26:35throughout the supply chain and this
  646. 26:37will only happen when you are sharing
  647. 26:39the data information with all the
  648. 26:41stakeholders right so improved supply
  649. 26:44chain visibility will lead to agility so
  650. 26:47quickly you can respond to proactively
  651. 26:49you can respond to whatever uh
  652. 26:52uncertainty is coming risk is coming
  653. 26:54from the market so that you can tap
  654. 26:56quickly so just before proceeding
  655. 26:59further I'll show you one video where
  656. 27:01you can see how these intelligent Supply
  657. 27:03chains what are the expectations in
  658. 27:04terms of when we are talking about the
  659. 27:06intelligent Supply chains so here I have
  660. 27:08included some uh video links you guys
  661. 27:11can just quickly go through these videos
  662. 27:13so you can see the only way to deal with
  663. 27:17this kind of supply chain uncertainty is
  664. 27:19transparency and visibility throughout
  665. 27:21the supply chain so that quickly you can
  666. 27:23share the information with all the
  667. 27:25stakeholders and accordingly that quick
  668. 27:27action can be taken so just uncertainty
  669. 27:30versus risk risk is something that can
  670. 27:33be estimated if you are going this way
  671. 27:35you can be sure that maybe there is 15%
  672. 27:39risk if you are going to this way maybe
  673. 27:4125% risk if you're going to this way
  674. 27:43maybe 10% risk but if this risk is 25%
  675. 27:47maybe the returns are maybe uh 35% if
  676. 27:51risk is 15% maybe returns are only 20%
  677. 27:55so that way you can find out right so
  678. 27:57risk of you know adopting a particular
  679. 28:00action and then you can find uncertainty
  680. 28:02is something that uh the probability you
  681. 28:05cannot find out right this is clearly
  682. 28:08unced situation which can happen which
  683. 28:11cannot happen right so and these are
  684. 28:13some of the events like we talk we are
  685. 28:15talking about the disaster events right
  686. 28:17so who can predict that this is going to
  687. 28:19be the you know depth of that particular
  688. 28:21disaster still we can predict in that
  689. 28:23way that Cyclone is coming low pressure
  690. 28:25Zone and that all we have environment
  691. 28:28you know tracking parameters where we
  692. 28:30are predicting up to some extent right
  693. 28:32so but how much it it is going to uh
  694. 28:36interrupt your supply chain is all
  695. 28:38together another story right so talking
  696. 28:40about supply chain uncertainty and risk
  697. 28:43either we are dealing with the
  698. 28:44information uncertainty Logistics
  699. 28:46related customer related or environment
  700. 28:49related uncertainty and risk so
  701. 28:52Logistics related
  702. 28:53uncertainty simply means when you are
  703. 28:56delivering the product from one end to
  704. 28:57other end so anything can go so that
  705. 29:00means that will if anything is
  706. 29:03interrupting your physical flow of the
  707. 29:06goods within the supply chain so that
  708. 29:08means that can delay your delivery time
  709. 29:11transport Network management will be
  710. 29:13into picture storage issues will be
  711. 29:15there you will not be having enough
  712. 29:17inventory carrier Str flight
  713. 29:19Transportation operation all will be
  714. 29:21affected right if you are not having the
  715. 29:24exact information related to your
  716. 29:26Logistics right or any uncertainty is
  717. 29:29there with the logistics right and then
  718. 29:32uh uncertainty May uh these
  719. 29:34uncertainties may impact your efficiency
  720. 29:36and effectiveness of the overall
  721. 29:38Logistics process you are not sure about
  722. 29:41how how much you need to Warehouse how
  723. 29:43much you need to uh transport how much
  724. 29:45you need to go for the final delivery so
  725. 29:48those kind of things you are not sure
  726. 29:50right so uncertainties are on that side
  727. 29:53information uncertainty this is a kind
  728. 29:55of uncertainty because this will lead
  729. 29:58lead to all other uncertainty if any
  730. 30:00lack is there in the information
  731. 30:02delivery that means your whole network
  732. 30:04is Disturbed right if you are not
  733. 30:06getting proper uh demand function right
  734. 30:10how it is going to behave for the next
  735. 30:1215 days how you will plan your
  736. 30:14manufacturing cycle how you'll plan your
  737. 30:16procurement cycle how much inventory you
  738. 30:18will store in the storage house right so
  739. 30:20that information accuracy availability
  740. 30:24and timely processing is very much
  741. 30:26required these are some of the features
  742. 30:28when we are talking about the
  743. 30:29information uncertainty customer related
  744. 30:32uncertainty is always there how many
  745. 30:35customers are visiting your retail
  746. 30:37outlet what is the footfall how many are
  747. 30:39converted maybe somewhere you can say
  748. 30:41maybe on an average maybe 50% or 60% you
  749. 30:45are converting but then this is
  750. 30:47something consumer behavior is very very
  751. 30:49typical to predict reputation risk if
  752. 30:53negative you know brand image is
  753. 30:55associated or some negative experiences
  754. 30:58are there so then also you need to tap
  755. 31:00that right or customers is having that
  756. 31:03uh reputation right so receivable risk
  757. 31:06if you are giving something on credit so
  758. 31:08whether you are going to receive that or
  759. 31:10not that is also a kind of risk then
  760. 31:12forecasting errors demand delays to
  761. 31:14customer those all can come from the
  762. 31:17customer end right because C sometimes
  763. 31:20customer are just roaming around the
  764. 31:21market and buying nothing sometime they
  765. 31:23are not coming with the mind that they
  766. 31:25will buy something and buy so many stuff
  767. 31:28in the end right so that those things
  768. 31:30are very unpredictable environment
  769. 31:33uncertainty in terms of all the
  770. 31:35dimension political economic social
  771. 31:38technological environmental Global
  772. 31:40factors whatever there right any Global
  773. 31:42event Russia Ukraine bar suddenly your
  774. 31:45crude oil prices are going up Suddenly
  775. 31:47Transportation industry is hit badly the
  776. 31:49cost of you know shipping the product
  777. 31:52will go like anything or any other
  778. 31:54product coming from that reason will
  779. 31:56affect adversely any any Global event
  780. 31:59happens so and then political if there
  781. 32:02is change over so you can see how the
  782. 32:04market will react right so those all
  783. 32:07Market sentiments are uh you know
  784. 32:09attached with the if there is change in
  785. 32:11the government right how we can mitigate
  786. 32:13these supply chain uncertainty some of
  787. 32:15the measures we can take right regular
  788. 32:19Plan Generation planning is something is
  789. 32:22not permanent right if you are looking
  790. 32:25for this this is permanent plan that
  791. 32:27cannot happen so you need to generate
  792. 32:30frequent plan maybe today whatever I'm
  793. 32:32planning tomorrow it may go obsolete
  794. 32:34right so maybe some other factors which
  795. 32:37we you know yesterday we did not uh
  796. 32:40considered and today are very very
  797. 32:42important right so in that way you need
  798. 32:45to go with very frequent plans you need
  799. 32:49to evaluate again the plans with the
  800. 32:51changing Market scenario and then when
  801. 32:54you are saying that that means that if
  802. 32:56you know uh you are still working with
  803. 32:59the manual kind of planning so it will
  804. 33:01not work right so automatically you need
  805. 33:04to you know automate your warehouses
  806. 33:06inventory your stock your manufacturing
  807. 33:08so that immediately information can be
  808. 33:10shared and if that is happening you can
  809. 33:12reduce the inventory cost by 37% because
  810. 33:16continuously you are coming up with the
  811. 33:19uh changing environment you are uh
  812. 33:21modeling in your uh equation right
  813. 33:25consistency in planning now see if today
  814. 33:28I'm saying I'm a responsive supply chain
  815. 33:31and something goes wrong in the
  816. 33:32environment and then I'm so now I'm
  817. 33:34saying that I want to compete on cost
  818. 33:36how it can happen if Rolex suddenly
  819. 33:39start advertising the cheaper product
  820. 33:41watches they are providing who will
  821. 33:42believe in that and then then then the
  822. 33:45first thing will come in our mind those
  823. 33:47who are bearing the Rolex and then
  824. 33:50whether they are compr obviously they
  825. 33:51will be compromising with the quality
  826. 33:53that's why they are reducing so that is
  827. 33:55something that consistency planning
  828. 33:58should go throughout the supply chain
  829. 34:00right so that standardization today you
  830. 34:02are responsive tomorrow you should be
  831. 34:04responsive that is the main thread you
  832. 34:07know uh connecting all the stakeholders
  833. 34:10so integration of additional data source
  834. 34:12it's not only one channel through your
  835. 34:14marketing channel or distribution or
  836. 34:15sale you are getting the data how you
  837. 34:17can track the pattern through different
  838. 34:19social media websites right that is
  839. 34:21another source how customers are uh you
  840. 34:25know rating those products on different
  841. 34:27websites those also can be a source of
  842. 34:29for your you know renovating the product
  843. 34:31supplying the product to the market so
  844. 34:33that you need to align your resources
  845. 34:36with the demand whatever it is coming
  846. 34:38and accordingly you need to change your
  847. 34:40production plans as well enhanced
  848. 34:43visibility across the supply chain is
  849. 34:46again now bull whip effect so this I was
  850. 34:49talking about like let's say this is how
  851. 34:52the information gets implified over the
  852. 34:55stages here the customer is placing
  853. 34:57order for 50 products with the
  854. 35:01retailer retailer is placing another
  855. 35:04maybe with keeping in mind maybe there
  856. 35:07may be uh you know increase in the uh
  857. 35:11demand so he is placing order 75 with
  858. 35:14the uh you know uh manufacturer
  859. 35:16manufacturer then again manufacturer is
  860. 35:20there and then your raw material
  861. 35:22supplier is there so raw material
  862. 35:25manufacturer is placing for safer side
  863. 35:27maybe 110 products components so this is
  864. 35:30see how this information gets implified
  865. 35:33over multiple stages how you can reduce
  866. 35:36that with maybe electronic data inter uh
  867. 35:38interchange is there so quickly you can
  868. 35:41share the exact information if 50 is
  869. 35:43there you need to acquire the material
  870. 35:45as per 50 why to keep that extra you
  871. 35:48know more than double inventory okay so
  872. 35:51that can only happen when you are having
  873. 35:54holistic View and performance tracking
  874. 35:56kpis where you have the not only kpis
  875. 36:00for one manufacturer or distributor or
  876. 36:02where you warehousing right you should
  877. 36:05have uh keep kpis aligned with all the
  878. 36:08stakeholders and one holistic approach
  879. 36:11system approach should be adopted for
  880. 36:13this so talking about the last concept
  881. 36:16related to this is supply chain macro
  882. 36:19processes we'll quickly
  883. 36:21see see whatever we are doing with the
  884. 36:24supplier known as supplier relationship
  885. 36:26management internal supply chain from
  886. 36:29raw material to finished goods here raw
  887. 36:32material is coming whatever we are doing
  888. 36:34within our manufacturing unit is
  889. 36:36internal supply chain management and how
  890. 36:38we are managing with the customer is
  891. 36:40customer relationship management right
  892. 36:43so what is happening with the supplier
  893. 36:45we are sourcing the supplier we are
  894. 36:47negotiating them on the quantity quality
  895. 36:49price right and then we are buying that
  896. 36:51buying also not only single lot we'll
  897. 36:54see in one month how many Lots we'll buy
  898. 36:56what will be the quantity in each load
  899. 36:58and then throughout the year how many
  900. 37:00Lots we are going to buy so in that way
  901. 37:02when you are saying that these are our
  902. 37:04suppliers you are sharing your recipe
  903. 37:06with the suppliers only then they will
  904. 37:08manufacture the components for you right
  905. 37:10so design collaboration is there and
  906. 37:13obviously Supply is there because you
  907. 37:14are getting the supply once you'll get
  908. 37:16the supply within uh your manufacturing
  909. 37:19unit how you'll convert that raw
  910. 37:21material into finished one you will
  911. 37:23store your raw material then strategic
  912. 37:25planning will be there maybe you have
  913. 37:27have three different production lines
  914. 37:29right one production line A and B model
  915. 37:32you are running second production line c
  916. 37:34d e and then maybe so many other
  917. 37:37different models you are running on the
  918. 37:38third production line so strategic
  919. 37:41planning demand planning will come into
  920. 37:43picture how many units of D today will
  921. 37:45manufacture how many units of B today
  922. 37:47will manufacture so when we'll shift
  923. 37:49from A to B how quickly will shift that
  924. 37:52so internal planning how we are going to
  925. 37:54fulfill the order so all Supply order
  926. 37:57you need to match with the internal
  927. 37:59supply chain management we discussed
  928. 38:02about the first three main streams of
  929. 38:04supply chain here you can say the first
  930. 38:06stream this is the second stream this is
  931. 38:09the third stream which is interacting
  932. 38:10with the final customer now you need to
  933. 38:13Market first you need to identify the
  934. 38:16demand the expectation from the customer
  935. 38:18only then you can you know go for
  936. 38:20Designing of the product designing of
  937. 38:22the process how you will convert raw
  938. 38:24material into finished one then pricing
  939. 38:26how much cust customer is willing to pay
  940. 38:28is there really that problem is really
  941. 38:31that important for the customer that he
  942. 38:33is ready to pay this much right then you
  943. 38:35will sell and once you will sell you
  944. 38:37will provide after salale Services right
  945. 38:39you will installation related Services
  946. 38:41any returns are happening or any damages
  947. 38:44are happening or maybe you are providing
  948. 38:46the you know spare parts to maintain the
  949. 38:49product maybe over 20 years right okay
  950. 38:52so these are some of the things which
  951. 38:53are related to customer relationship
  952. 38:55management right so these three macro
  953. 38:58processes within the supply chain we can
  954. 39:00see and whenever there is any
  955. 39:02uncertainty among any of this maybe we
  956. 39:06figured the market demand in a wrong way
  957. 39:09we'll plan strategic planning will be in
  958. 39:11wrong way and we'll Source the wrong
  959. 39:13component right so we need to align all
  960. 39:17these M macro processes so that we can
  961. 39:20maintain the smooth supply of all these
  962. 39:22materials already we discussed in detail
  963. 39:25right so uncertain
  964. 39:28basically coming from these four sources
  965. 39:32okay these four sources you need to tap
  966. 39:34and need to maintain the but still that
  967. 39:37cannot be 100% uh accurate information
  968. 39:40but still you can somewhere you can go
  969. 39:42for that and uh uh how you can mitigate
  970. 39:46that uh uncertainty you need to
  971. 39:48collaborate with the suppliers close
  972. 39:50relationship you need to enhance the
  973. 39:52visibility and relationship we have seen
  974. 39:54that video that throughout that Supply
  975. 39:57ch if visibility is there you can track
  976. 39:59the operations right and your supply
  977. 40:01chain should be flexible asile quickly
  978. 40:03you are responding and for you are
  979. 40:05responding for anything right you ask me
  980. 40:07any product I'll provide you any product
  981. 40:10right and then you need to continuously
  982. 40:12monitor your kis your risk and then you
  983. 40:15need to develop the resilient supply
  984. 40:17chain if anything goes wrong even then
  985. 40:19your supply chain is standing there
  986. 40:21right so that's all these are some of
  987. 40:23the
  988. 40:25references so thank you very very much

About this transcript

This page contains the full transcript of Lecture 26 : Supply Chain Uncertainty and Processes by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 6,654 words across 988 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.