  3. 0:25so hello dear friends welcome back to
  4. 0:27nptl online course on Logistics and
  5. 0:29Supply Chain management
  6. 0:30so we started discussing uh the basic
  7. 0:33supply chain structure what are the
  8. 0:35different concept under Supply Chain
  9. 0:37management and then we divided this
  10. 0:39whole supply chain into three different
  11. 0:42streams right so first starting with
  12. 0:44your suppliers ending to the
  13. 0:46manufacturer second within manufacturing
  14. 0:49facilities whatever is happening how we
  15. 0:51are streamlining all those operations
  16. 0:53and third stream is from your
  17. 0:55manufacturer end to Consumer end right
  18. 0:59so uh in the the last session we
  19. 1:01finished our discussion uh on uh this uh
  20. 1:04first stream where we discussed about
  21. 1:06the procurement management sourcing
  22. 1:08management and Supply management so now
  23. 1:10today we'll start our discussion on uh
  24. 1:13the second stream which is uh uh again
  25. 1:16uh within that manufacturing facility
  26. 1:19what uh how we are streamlining the
  27. 1:21operations so again I'm drawing just for
  28. 1:24your uh uh just to recall that I'm
  29. 1:27drawing that basic structure of supply
  30. 1:29chain where we have raw material
  31. 1:31suppliers we have manufacturer here and
  32. 1:34in the end we have that distribution
  33. 1:37Network through which we are reaching to
  34. 1:39customer so today we'll start our
  35. 1:41discussion on this second stream where
  36. 1:43we will take care of your operations
  37. 1:45management how we are you know uh
  38. 1:47managing different activities under that
  39. 1:50right then we'll talk about material
  40. 1:52management how the smooth flow of
  41. 1:55material can be ensured then we'll talk
  42. 1:57about how we are converting the uh your
  43. 2:00raw materials into finished one right so
  44. 2:03then we'll move towards the third stream
  45. 2:06which is taking care of your the final
  46. 2:09distribution from your manufacturing and
  47. 2:11to the End customer right so we'll talk
  48. 2:13about the distribution management
  49. 2:15although we have discussed a lot all I
  50. 2:19think almost 18 to 19 sessions uh while
  51. 2:23discussing your third stream but still
  52. 2:25quickly we'll go through what is there
  53. 2:27if we'll talk about the complete supply
  54. 2:30chain we'll quickly go uh through that
  55. 2:32third stream as well so operation
  56. 2:36management so operation management here
  57. 2:39we need to understand the basic
  58. 2:41difference between operation management
  59. 2:43and production management right
  60. 2:45sometimes we are using this these terms
  61. 2:47interchangeably but operation management
  62. 2:50if the difference lies with the scope
  63. 2:53right we we'll talk about under
  64. 2:55production management we are talking
  65. 2:56only about how we are converting the raw
  66. 2:58material into finished one so taking
  67. 3:00care of all those activities which are
  68. 3:02required to finish that good right so
  69. 3:05that is under production management
  70. 3:06operation management can happen anywhere
  71. 3:09right whatever processes activities you
  72. 3:11are doing in HR department that is also
  73. 3:14part of operation right how you are
  74. 3:15handling those operations even if you
  75. 3:17are interacting with the customer
  76. 3:19customer relationship management it's
  77. 3:21all always again you are into operations
  78. 3:24right how you are managing the records
  79. 3:25packaging again operations distribution
  80. 3:28again operational area so when we Define
  81. 3:31operation as uh you know uh subp part of
  82. 3:35supply chain where the complete picture
  83. 3:37we can uh you know view as complete
  84. 3:39supply chain and uh as a part of that
  85. 3:42complete supply chain we are doing so
  86. 3:44many different functional uh so many
  87. 3:46different functional units are there who
  88. 3:48are doing all those operations right
  89. 3:51so it is an area of business management
  90. 3:54that is fundamental to running a
  91. 3:56successful Enterprise right so SU
  92. 3:59uccessful Enterprise how you can ensure
  93. 4:02successful when you are ensuring the
  94. 4:04smooth supply of the raw material in
  95. 4:07most efficient way right whatever
  96. 4:10products and services are demanded from
  97. 4:12the customer end you are getting that
  98. 4:15information from the market accordingly
  99. 4:17you are designing your process designing
  100. 4:20your product and then accordingly you
  101. 4:22are sourcing the partners right so this
  102. 4:25is complete operation management right
  103. 4:27so how efficiently and effectively
  104. 4:30that means with minimum cost and highest
  105. 4:32quality how you can deliver that product
  106. 4:35so you need to take care of that so you
  107. 4:37can see if a company is managing all
  108. 4:39those different it's not that only one
  109. 4:41part only manufacturing you need to
  110. 4:43ensure right even if you are doing
  111. 4:45packaging that is also equally important
  112. 4:48because it is the first phase if you are
  113. 4:50doing order fulfillment that is also
  114. 4:52equally important if you are concerned
  115. 4:54about the transportation management
  116. 4:56finding the optimal route best route
  117. 4:59with Min imum cost optimally utilizing
  118. 5:02the capacity of the container optimally
  119. 5:04utilizing the capacity of the warehouse
  120. 5:07so all comes under that so you can see
  121. 5:09if you are planned in that way how it
  122. 5:11can make difference so if you'll see
  123. 5:14what are the responsibilities of uh
  124. 5:16business operation management first
  125. 5:18thing is you need to design the
  126. 5:20process right how you will ensure the
  127. 5:23smooth Supply process not only your
  128. 5:26manufacturing process manufacturing
  129. 5:28obviously you need to design all the
  130. 5:31stages required to convert that raw
  131. 5:33material maybe if product is very simple
  132. 5:36kind of supply chain or manufacturing so
  133. 5:38maybe five or 10 stages are there till
  134. 5:40the packaging If the product is a kind
  135. 5:42of maybe you are manufacturing
  136. 5:44automobile you are manufacturing some
  137. 5:46home appliances where maybe these stages
  138. 5:49can vary from 100 stages to maybe th000
  139. 5:52stages even up to the final finished
  140. 5:54product with the packaging right so how
  141. 5:56you are designing the complete process
  142. 5:58right so that is one again if this is
  143. 6:01one manufacturing Department if I'm
  144. 6:03talking about let's talk about the
  145. 6:05process Design Within quality there
  146. 6:07should be some process how they will
  147. 6:09ensure the incoming quality uh raw
  148. 6:12material right so uh that also you will
  149. 6:15come up with the quality standards you
  150. 6:17will develop all the check sheets you
  151. 6:19will prepare those check sheets record
  152. 6:21those data and then you'll say finally
  153. 6:23lot is accepted or rejected how you will
  154. 6:26ensure the quality during the process so
  155. 6:29again you will Define your different
  156. 6:31parameters okay at the different stages
  157. 6:33critical stages you will Define and then
  158. 6:35that is also process design right so
  159. 6:37under that different functional units
  160. 6:40how you are designing the process within
  161. 6:42HR how you are designing the process how
  162. 6:45one if any new entry is coming how is
  163. 6:48supposed to you know go through through
  164. 6:50all those stages of maybe joining to the
  165. 6:52final maybe induction placement
  166. 6:55introduction and all those things that
  167. 6:57is also complete process the process
  168. 7:00flow chart of that particular functional
  169. 7:02unit right then we need to balance the
  170. 7:05resources revenues and cost now what are
  171. 7:09the customer expectations and demands
  172. 7:12that will
  173. 7:13obviously you know help you to gather
  174. 7:17what are the resources you need to
  175. 7:19gather those resources and then when you
  176. 7:21are acquiring those resources obviously
  177. 7:23there will be cost and then you will
  178. 7:25sell your product finally into the
  179. 7:27customer market so then you will be
  180. 7:29generating the revenues so you need to
  181. 7:31balance all these three points right and
  182. 7:33then continuously you need to ensure
  183. 7:36that you are evolving with your product
  184. 7:38and services design right like Phillips
  185. 7:41is always they are coming with the
  186. 7:42advertisement like Innovation and you
  187. 7:45right so that means whatever product
  188. 7:47they are selling today tomorrow they
  189. 7:48will come with better promises right so
  190. 7:51they are somehow they are changing
  191. 7:52something with the product design
  192. 7:54product features process design
  193. 7:56longivity they are ensuring the smooth
  194. 7:59you know functioning of the product they
  195. 8:01are ensuring So This Is How They are
  196. 8:03renovating every day right then you need
  197. 8:06to go with the overall operational
  198. 8:09strategy so that also if you are looking
  199. 8:11for expansion you are coming up with new
  200. 8:13model you need to set up new production
  201. 8:16line that is also a responsibility of
  202. 8:18the manager right if you are looking for
  203. 8:20maybe acquiring some other functional
  204. 8:22unit like we talked about maybe we are
  205. 8:24into assembly part we are acquiring some
  206. 8:27molding plant of some other unit right
  207. 8:30so then also you need to align the
  208. 8:32operation strategy between two
  209. 8:33organizations right then streamlining
  210. 8:36and optimizing the production obviously
  211. 8:39that is part of operation management
  212. 8:42production under production also
  213. 8:43operation management how we are
  214. 8:44converting the raw material into the
  215. 8:46finished one with minimum cost right
  216. 8:49minimum cost means improved productivity
  217. 8:51and efficiency and we should reduce the
  218. 8:53waste also when we are manufacturing the
  219. 8:55processes so under this operation
  220. 8:58management four different key concept we
  221. 9:01can uh again you know arrange these
  222. 9:04operational area into four different
  223. 9:06functional unit processes you need to
  224. 9:08Define all the processes like I defined
  225. 9:11production is one process ensuring
  226. 9:13quality is another
  227. 9:15process storing your raw material is
  228. 9:19another process packaging is another
  229. 9:22process designing is another process
  230. 9:26ensuring HRM is another process right
  231. 9:29these all are different processes within
  232. 9:31that organization and under each process
  233. 9:34you have set of activities you are doing
  234. 9:37like to ensure quality to ensure
  235. 9:39production to ensure maintenance uh
  236. 9:42timely maintenance to ensure you know
  237. 9:44the right skills human skills required
  238. 9:47then capacity how you are developing the
  239. 9:50capacity like we we we are talking about
  240. 9:53Let's uh some organization is focusing
  241. 9:56on maybe growth strategy right grow
  242. 9:58growth operation strategy so that means
  243. 10:00they are looking towards producing more
  244. 10:03obviously growth strategy they are
  245. 10:05looking in terms of some new markets
  246. 10:06they are looking in terms of some new
  247. 10:08products new offerings whatever it is
  248. 10:10but in the end they are going to enhance
  249. 10:13the capacity whatever they are producing
  250. 10:15right now maybe they want to enhance the
  251. 10:17capacity how they can enhance the
  252. 10:19capacity so that also you how you are
  253. 10:22designing expansion strategies whether
  254. 10:24you kept in mind whether there is enough
  255. 10:26space to enhance the existing capacity
  256. 10:28or sometimes whatever capacity you have
  257. 10:31you can go for double shifts you can go
  258. 10:33for triple shifts you can me this is how
  259. 10:35you are managing up to some extent but
  260. 10:37if still the demand is roolling so how
  261. 10:39you will you know uh cope up with the
  262. 10:42demand it's not that you will not you
  263. 10:44will say to the customer that now after
  264. 10:46this we are not going to deliver because
  265. 10:48expansion everyone wants expansion if
  266. 10:51the growth is coming itself from the
  267. 10:52market why don't we go for that so that
  268. 10:55capacity utilization whatever the space
  269. 10:57is how efficient ly we are utilizing the
  270. 11:00space right we have talked about
  271. 11:02warehousing utilization right we have
  272. 11:04talked about the truck carrying our
  273. 11:06inventry how we can utilize the full
  274. 11:09container capacity and then we can
  275. 11:11reduce the cost right so that is another
  276. 11:15functional unit of operation management
  277. 11:17and through this we need to ensure the
  278. 11:20smooth flow of all those activities see
  279. 11:23these activities are linked if quality
  280. 11:25control is not ensuring the raw material
  281. 11:28quality under iqc incoming quality
  282. 11:31control you cannot ensure the
  283. 11:33production right if proper HRM is not
  284. 11:37coming up with the you know the hiring
  285. 11:39process placement process who will
  286. 11:41ensure the quality who will be in the
  287. 11:43production Department who will take care
  288. 11:45of the maintenance department so these
  289. 11:47all activities you need to ensure the
  290. 11:49smooth flow of these activities right
  291. 11:51within that
  292. 11:52organization so process of operation
  293. 11:55management planning what needs to be
  294. 11:58done and what it needs to be done that
  295. 12:00we need to ensure how we'll Design This
  296. 12:03see whatever these planning phases or we
  297. 12:07are talking about the scheduling even
  298. 12:09the execution these uh all these kind of
  299. 12:13informations are coming from where from
  300. 12:15the market end from the customer right
  301. 12:17so first thing is how we are tapping our
  302. 12:19customer how we are tapping the market
  303. 12:22potential how we are recording the you
  304. 12:24know their requirements what our
  305. 12:26competitors are doing what what other
  306. 12:28Industries are doing in the same area
  307. 12:30right so that information is being
  308. 12:33supplied being processed within your R&D
  309. 12:35unit within your uh in-house
  310. 12:38manufacturing unit and then you are
  311. 12:40developing a new product new offerings
  312. 12:42or maybe you are renovating again the
  313. 12:45same product in a better way right uh so
  314. 12:48after renovating now again maybe you are
  315. 12:52changing some of the components of the
  316. 12:54raw material you are doing using right
  317. 12:56or maybe you are using different design
  318. 12:59process you need to change so that means
  319. 13:01that information need to share with
  320. 13:03everyone when you are going to do that
  321. 13:05so when you are planning to change your
  322. 13:08raw material suppliers obviously they
  323. 13:10also need to change I'm not saying that
  324. 13:12100% components will be replaced but
  325. 13:14maybe some components will be replaced
  326. 13:17by others right if you are seeking that
  327. 13:19maybe uh uh if ACV are manufacturing
  328. 13:23without inverters or with inverter AC's
  329. 13:25are coming so when invert with inverter
  330. 13:27AC's are coming that techn techology you
  331. 13:29need to ensure right so then that you
  332. 13:32need to collaborate with the those raw
  333. 13:34material suppliers who are providing
  334. 13:35those components right so then
  335. 13:37scheduling when you need to perform the
  336. 13:40each task that is another uh important
  337. 13:42function of operation management and
  338. 13:45when you are taking these decision on
  339. 13:46time obviously then only you can ensure
  340. 13:49the effective and efficient utilization
  341. 13:52of the resources right execution will
  342. 13:55consume your resources those resources
  343. 13:58may be in terms of we talked about
  344. 14:01always basic resources 5 m
  345. 14:04man
  346. 14:07money
  347. 14:09machine
  348. 14:12material and
  349. 14:15methods these are basic resources we
  350. 14:17usually talk about but yes technology
  351. 14:20other skills we are using Manpower we
  352. 14:22are using right so there are so many
  353. 14:24other inputs but these are whenever we
  354. 14:26are talking about execution that means
  355. 14:28we are consuming now resources so this
  356. 14:30is a kind of process which ensures the
  357. 14:34you know execution and carries the
  358. 14:36maximum cost right because actually we
  359. 14:38are doing that operation so let's talk
  360. 14:40about different types of operations we
  361. 14:41are doing first is manufacturing
  362. 14:43everyone is aware about what we are
  363. 14:45doing in manufacturing we are designing
  364. 14:47the prototypes then we are creating then
  365. 14:50we are commercializing after
  366. 14:51commercializing we need to deliver those
  367. 14:53goods and products Services whatever we
  368. 14:55have we have promised in the market we
  369. 14:58need to do that right so for ensuring
  370. 15:01manufacturing you need to ensure all the
  371. 15:03raw all the five Ms Right minimum those
  372. 15:06five M other than that capacity floor
  373. 15:09production floor all those things are
  374. 15:11also required right your quality tools
  375. 15:13or all description sheets documentation
  376. 15:16everything is required as resource right
  377. 15:19and those resources you will be
  378. 15:20consuming while converting your uh your
  379. 15:23raw materials into finished one services
  380. 15:26this is we talked about Services versus
  381. 15:28Manufacturing right here only basic
  382. 15:30difference is that your customer is part
  383. 15:33of your uh delivery process right so
  384. 15:36that means that in that way Services
  385. 15:38industry is very heterogeneous kind of
  386. 15:40industry where every service delivered
  387. 15:43is unique in its own way right because
  388. 15:45continuously customer intervention is
  389. 15:47there so how we can ensure that smooth
  390. 15:50and seamless experience retail itself is
  391. 15:52a kind of services industry product is
  392. 15:55coming from PNG customer is coming from
  393. 15:57somewhere else what as a retail C uh
  394. 16:00retail unit I'm doing as a retailer I'm
  395. 16:03arranging the PNG inventory in my shelf
  396. 16:06right I'm then managing the inventory
  397. 16:08when we need to replenish the inventory
  398. 16:10I'm placing the order with PNG or any
  399. 16:12intermediat if wholesaler distributor is
  400. 16:14involved in that way right so this is
  401. 16:16kind of services I'm providing that I
  402. 16:18have located my retail store near to the
  403. 16:21customer where customer can come and
  404. 16:24enjoy the products and my services of
  405. 16:26retail services right talking about
  406. 16:30Hospitality so how you are in uh
  407. 16:34directly interacting firstly with the
  408. 16:35first desk housekeeping how they are
  409. 16:38taking care of the cleanliness
  410. 16:39standardization and then sustainability
  411. 16:41all those 5S housekeeping approach we
  412. 16:43talked about
  413. 16:46series SK sits and SOS right so those 5S
  414. 16:51approach of Japanese term how we can
  415. 16:52sort how we can set in order so those
  416. 16:55things sustainable shining right
  417. 16:57cleanliness so we talked about under
  418. 16:59Hospitality Logistics again kind of
  419. 17:01services because you are not carrying
  420. 17:03any physically any product with you so
  421. 17:05if I'm shipping your product from point
  422. 17:07A to point B I'm not doing any value
  423. 17:09adding activity just I I am dropping the
  424. 17:12product at Point V so complete supply
  425. 17:14chain how we take care of the operation
  426. 17:17different functional units under that
  427. 17:19complete supply chain raw material
  428. 17:20acquisition is one operations placing
  429. 17:23order with the uh placing order and uh
  430. 17:26execution of those orders with the
  431. 17:28vendors is another uh functional unit
  432. 17:30right Inventory management is another
  433. 17:32functional unit storage house is another
  434. 17:34functional unit your manufacturing floor
  435. 17:37production floor is another functional
  436. 17:39unit distribution is another functional
  437. 17:40unit so how we can take care of the
  438. 17:42complete supply chain so strategy of
  439. 17:45operation management obviously first
  440. 17:46thing is how we can reduce the cost see
  441. 17:49these if I'll talk about first three
  442. 17:51they are very very
  443. 17:53interrelated quality if I'm saying that
  444. 17:56if you are producing less rejection that
  445. 17:59means you are very efficient with the
  446. 18:01process your process capability is very
  447. 18:04very high that means you are not
  448. 18:05producing any rejection and whenever you
  449. 18:09are processing the final product or
  450. 18:11whatever components you are integrating
  451. 18:13in that final product that also ensures
  452. 18:16the quality because your processed
  453. 18:18design is of such kind that that is
  454. 18:20ensuring the quality itself when you are
  455. 18:23ensuring the less rejection obviously
  456. 18:26productivity will improve earlier what
  457. 18:29was what we were doing let's say uh the
  458. 18:32F we'll talk about fall of rejection
  459. 18:34rate was 5% that means every 100 pieces
  460. 18:37we were producing five we were rejecting
  461. 18:40because of the faulty operation
  462. 18:43processes handling whatever we were
  463. 18:45doing during that manufacturing so now
  464. 18:47if I can reduce this to 2% so you see I
  465. 18:50simply added three more product into
  466. 18:53that now I delivering instead of 95 now
  467. 18:56I'm delivering 97 products quality
  468. 18:58products in the market and how I can
  469. 19:01ensure that whatever 100 products are
  470. 19:03manufacturing all are quality products
  471. 19:05so in that way so see productivity will
  472. 19:08be
  473. 19:09improved quality obviously and then
  474. 19:12we'll reduce the cost also this is one
  475. 19:14way how we can reduce the process
  476. 19:16rejection during manufacturing and will
  477. 19:18because if we are damaging the product
  478. 19:20that is also cost to our company and
  479. 19:22will not generate any Revenue because
  480. 19:24already we damage those process uh those
  481. 19:26components during the process right so
  482. 19:29then optimally utilizing the data see to
  483. 19:33ensure the smooth operation you need to
  484. 19:36First collect the data collect the data
  485. 19:39from the market survey Trends whatever
  486. 19:41you are doing whatever way your sales
  487. 19:43team is generating the data and then you
  488. 19:45need to figure out for that particular
  489. 19:47Market this is going to be the demand as
  490. 19:50per that demand function then you will
  491. 19:52start your operation what operation you
  492. 19:55will acquire the raw material you will
  493. 19:57convert the raw material into finished
  494. 19:58and then finally move to the market to
  495. 20:00meet that Demand right setting goals and
  496. 20:03forecasting like I told you
  497. 20:06forecasting all techniques whatever we
  498. 20:08will use we'll use that data right and
  499. 20:11then we'll set the goals accordingly
  500. 20:13enhance collaboration this is important
  501. 20:15operation management
  502. 20:17see uh if we are saying that we want to
  503. 20:20be very productive right efficiency is
  504. 20:23our main parameter so reducing cost is
  505. 20:26the primary concern if we are talking
  506. 20:28about the
  507. 20:29efficiency and then if you are putting
  508. 20:31extra packaging that means you are
  509. 20:36behaving in a wrong direction you are
  510. 20:38operating in a wrong direction because
  511. 20:40our manufacturing is uh the USP whatever
  512. 20:44we are carrying right now is the minimum
  513. 20:46cost how we can ensure the minimum
  514. 20:48packaging cost by reducing the extra
  515. 20:51packaging or maybe by but not at the
  516. 20:53cost of you know destroying that product
  517. 20:55right then Human Resource Management
  518. 20:57already I talked about how we can ensure
  519. 20:59the smooth flow of this resource which
  520. 21:02is very very important long-term asset
  521. 21:04if you are maintaining those Resources
  522. 21:06with you so this will improve the
  523. 21:09overall supply chain and internal
  524. 21:11collaboration as well because this is
  525. 21:14total integrated system one person
  526. 21:16cannot be efficient the other person is
  527. 21:18saying we are not competing on cost and
  528. 21:21then if BMW they are competing just High
  529. 21:25status product the class is totally
  530. 21:27different so then if someone is coming
  531. 21:29with the idea of maybe some engine which
  532. 21:32will you know uh be more efficient in
  533. 21:35fuel efficient in that way but
  534. 21:37compromising somewhere with the pickup
  535. 21:39or somewhere with the top speed right so
  536. 21:42that means the basic purpose of BMW or
  537. 21:44Mercedes or those kind of F1 racing cars
  538. 21:48is defeated right so we need to uh
  539. 21:51integrate collaborate with every partner
  540. 21:53and this Baseline Common Thread should
  541. 21:55be there on what particular operation
  542. 21:58strategy we are working right so second
  543. 22:00part under this is material
  544. 22:02management so material management means
  545. 22:05whatever material we are using in the
  546. 22:07manufacturing unit we need to ensure the
  547. 22:10smooth Supply and while doing that we
  548. 22:13need to ensure that Optimum stock should
  549. 22:16be ensured so that means see this is I
  550. 22:20we discussed about once I'm taking the
  551. 22:23inventory let's say this is the total
  552. 22:24inventory right now i1 is the point
  553. 22:27right so when I'll start producing the
  554. 22:30finished goods I will start depleting
  555. 22:32the inventory and there must be some
  556. 22:34Safety stock level this is Safety stock
  557. 22:37level that when I'm reaching at this
  558. 22:40point automatically my purchase store
  559. 22:42Department should give the indication
  560. 22:44who is maintaining the inventory to the
  561. 22:46purchase department so that purchase
  562. 22:48Department can place the purchase order
  563. 22:51so at this point they will again
  564. 22:53replenish the inventory it will reach at
  565. 22:55this point so this will come again down
  566. 22:58and again will be replenished so this is
  567. 23:00how we'll maintain the Safety stock even
  568. 23:02sometimes if it comes down maybe while
  569. 23:05receiving the product we need to ensure
  570. 23:06that it never touches the zero point
  571. 23:08because then the whole production line
  572. 23:11will sit ideally so while ensuring this
  573. 23:14smooth supply of the raw material one
  574. 23:17thing is time we need to ensure and cost
  575. 23:20also and quality as well right so the
  576. 23:24fight here is how much quantity we
  577. 23:27should buy now let's say I don't want to
  578. 23:30keep much inventory because that is cost
  579. 23:32to me so I'm feeding only 100 units to
  580. 23:34my raw material supplier you supply me
  581. 23:36100 units in one lot but the other
  582. 23:38person like Walmart what he is doing
  583. 23:41Walmart is supplying instead of 100 they
  584. 23:44are asking for 10,000 units so the
  585. 23:48purpose here is maybe Walmart is
  586. 23:50maintaining the inventory but the cost
  587. 23:54the negotiation power Walmart is having
  588. 23:56over the other players because they are
  589. 23:58Fe leing large order to their suppliers
  590. 24:01so they can negotiate on that they can
  591. 24:03negotiate not only on cost but quality
  592. 24:06also and the timing also when they want
  593. 24:08the delivery right so that much Market
  594. 24:11also you need to ensure when you want to
  595. 24:13be you know in that cost efficient way
  596. 24:15when you are enjoying the economies of
  597. 24:17scale right so that is the main function
  598. 24:19of material management to ensure the
  599. 24:22smooth supply of the material with the
  600. 24:23minimum cost quality time constant is
  601. 24:26there always so that your production
  602. 24:28line should not stop working so main
  603. 24:31objective already we talked about lower
  604. 24:33how we can lower the acquisition price
  605. 24:36of inventory like Walmart is negotiating
  606. 24:38with the players high inventory turnover
  607. 24:41means average sale what is average sale
  608. 24:44and average inventory you are
  609. 24:45maintaining so if it is high it is
  610. 24:47better that means sales you your holding
  611. 24:50cost is very less because frequently you
  612. 24:52are ensuring the consumption of that
  613. 24:55inventory into uh you are converting
  614. 24:57into sales right continuous supply of
  615. 25:00material consistence quality and overall
  616. 25:04whatever cost direct indirect cost is uh
  617. 25:07there when you are you know acquiring
  618. 25:10that material and favorable supplier
  619. 25:12relationships when you are because
  620. 25:14Walmart in that way is managing the good
  621. 25:17relationship with the suppliers because
  622. 25:19they are feeding large order in that way
  623. 25:21suppliers are also happy to you know
  624. 25:24lower down the cost because they can
  625. 25:26also increase their margin because
  626. 25:28number of products they are producing so
  627. 25:30these are some of the points you can go
  628. 25:32quickly right so material management how
  629. 25:35you can ensure the make or buy decisions
  630. 25:37right product Improvement on that way
  631. 25:39how you can ensure forecast is another
  632. 25:41very important Technique we are using to
  633. 25:44ensure the smooth supply of the material
  634. 25:46right so material management components
  635. 25:49MRP you might have heard we have some
  636. 25:51software like Erp which are you know
  637. 25:53helping for uh ensuring the quantity and
  638. 25:56timing of the right raw material under
  639. 25:59material requirement planning right and
  640. 26:01purchase planning so ordering cost and
  641. 26:04holding cost are two major components we
  642. 26:07need to take care when we are talking
  643. 26:08about the purchase right so economic
  644. 26:10order quantity we talk about when we
  645. 26:12should can uh place the order and how
  646. 26:14much quantity should be ordered so
  647. 26:17usually the graph is if this is the
  648. 26:19quantity you are purchasing this is the
  649. 26:21cost on the buy
  650. 26:23AIS so obviously holding cost will
  651. 26:26increase like this right if if you are
  652. 26:28holding five units that much cost will
  653. 26:30be there if you are holding 50 units
  654. 26:32that much cost will be there but
  655. 26:34ordering cost will reduce like this
  656. 26:36because if you are placing five units
  657. 26:38order and then Walmart is placing 500
  658. 26:42units so per unit cost will reduced so
  659. 26:44somewhere your economic order quantity
  660. 26:46will be this total cost where you are
  661. 26:49getting the minimum price right this is
  662. 26:51economic order
  663. 26:53quantity this is how we are calculating
  664. 26:55the economic order quantity where your
  665. 26:58holding cost and ordering cost are at
  666. 27:00equilibrium right so inventory control
  667. 27:03again we need to me uh ensure through
  668. 27:06material management how we can minimize
  669. 27:08the cost and three types of inventory we
  670. 27:11are uh keeping with us right material
  671. 27:14supply management timely delivery of the
  672. 27:17quality material that is the main Moto
  673. 27:20of material management department and
  674. 27:22quality control so major function here
  675. 27:25is incoming quality control the
  676. 27:28Department which is ensuring the raw
  677. 27:30material quality incoming quality
  678. 27:32control has to ensure that whatever
  679. 27:34material as raw material is coming to
  680. 27:36the department should be defect free so
  681. 27:39already we discussed about significance
  682. 27:41of material management cost reduction in
  683. 27:43that way how we can minimize the waste
  684. 27:46and we are not keeping extra inventory
  685. 27:48we are still ensuring the smooth Supply
  686. 27:50improved quality already I related cost
  687. 27:53quality and productivity right so then
  688. 27:56timely delivery Timely delivery when you
  689. 27:59are executing your plans and those plans
  690. 28:01are based on the forecasting based on
  691. 28:04the in information based the decisions
  692. 28:06so obviously then timely delivery can be
  693. 28:08ensured because you are timely uh
  694. 28:12informing your raw material suppliers
  695. 28:13when it is required how much quantity is
  696. 28:15required right so and then the variety
  697. 28:18of the raw material required inventory
  698. 28:20optimization how you can minimize you
  699. 28:22can Implement just in time for material
  700. 28:24management is this the basic approach we
  701. 28:26are doing efficient Supply Chain by
  702. 28:30reducing the waste reducing the cost of
  703. 28:33producing the things storing the things
  704. 28:35minimizing the inventory your supply
  705. 28:37chain will be efficient so material
  706. 28:40management best practices you can see so
  707. 28:43develop a comprehensive material
  708. 28:44management plan so that it should be
  709. 28:46shared throughout the supply chain from
  710. 28:48the distribution Network to the
  711. 28:50manufacturing n uh house and then to the
  712. 28:53raw material supplier so that all can
  713. 28:55share that one plan and then implement
  714. 28:58Inventory management best practices
  715. 29:00maintain strong relationship that will
  716. 29:03only happen when you are doing the
  717. 29:04payments on time and whatever you are
  718. 29:07you know your you are grooming your
  719. 29:09product or processes you need to help
  720. 29:11your vendor also to groom their you know
  721. 29:14product basket and ensure that uh they
  722. 29:17are supplying those minimum ORD so that
  723. 29:19they can also ensure the minimum profits
  724. 29:21for what they are doing right so
  725. 29:24continuously Monitor and analyze data so
  726. 29:27that matter we developed you need to
  727. 29:29track that Matrix and then you need to
  728. 29:31record the data how we can perform on
  729. 29:33that data and then Erp kind of software
  730. 29:36enterprise resource planning we can use
  731. 29:38those kind of technology to you know uh
  732. 29:42plan our materials so what are the
  733. 29:44challenges for material management
  734. 29:46because we are having complex supply
  735. 29:47chain it's not that easy so if we are
  736. 29:49talking about sugar industry or steel
  737. 29:51industry directly getting the ore from
  738. 29:53the core and then processing it melting
  739. 29:56it and converting into Steel Road where
  740. 29:58very simple supply chain but then then
  741. 30:01distribution network is also very simple
  742. 30:03right so all the retailers you are
  743. 30:05feeding those retailer and they are
  744. 30:06supplying to the customers but let's
  745. 30:08talk about uh automobile industry car
  746. 30:11where different products you are using
  747. 30:14you are using glass you are using rubber
  748. 30:17you are using tires you are using
  749. 30:18engines you are using so many different
  750. 30:20metal components right so uh different
  751. 30:24leather you are using so many different
  752. 30:26you are using wood Al you are using so
  753. 30:29many different components more than
  754. 30:31thousand vendors are associated with you
  755. 30:33so in that way keeping the record
  756. 30:36keeping the information data management
  757. 30:38also very big challenge for those kind
  758. 30:40of you know managing all those vendors
  759. 30:42if you are using more than 500
  760. 30:44components th000 components if you are
  761. 30:46keeping minimum three vendor for each
  762. 30:48component so directly 3,000 vendors you
  763. 30:50are managing right so cost control when
  764. 30:55you need to negotiate with the suppliers
  765. 30:57that depends on on how much you are
  766. 30:58purchasing you can you know negotiate
  767. 31:00quality control already we discussed
  768. 31:03that you need to provide the
  769. 31:04specification to your raw material
  770. 31:06suppliers so that they can supply you as
  771. 31:09per that so how they can improve the
  772. 31:12profitability cost they need to reduce
  773. 31:15Logistics cost that operation management
  774. 31:17need to reduce the logistic cost
  775. 31:19inventory carrying cost already we
  776. 31:21discussed that graph how if inventory is
  777. 31:24more holding cost is more waste cost if
  778. 31:27you are producing rejection if rejection
  779. 31:29is coming from the distribution and
  780. 31:32retail chain retail shop is sending back
  781. 31:34the material because it is defected
  782. 31:37during damaged during the transportation
  783. 31:38that also it is cost manufacturing cost
  784. 31:41of converting raw material into finished
  785. 31:43one how you can minimize that how you
  786. 31:45can be more productive right so and then
  787. 31:48reduction of working capital working
  788. 31:51capital required how you can reduce that
  789. 31:53because if you are keeping 10,000
  790. 31:55inventory 10,000 CR inventory always in
  791. 31:58your stock you can see that is something
  792. 32:00lying idle with you you are not
  793. 32:02generating any Revenue out of that
  794. 32:04because as long as you are depleting
  795. 32:05that you are refilling that so that how
  796. 32:07you can minimize that so that the
  797. 32:09working capital required can be
  798. 32:11minimized last is production Management
  799. 32:13in the second stream which talks about
  800. 32:16how quickly with quality you can produce
  801. 32:19the finished goods and services right
  802. 32:21that is produ now we are core talking
  803. 32:23about the production floor which is a
  804. 32:25responsible for converting transforming
  805. 32:27raw material into finished one by taking
  806. 32:31all those five or six M right Market
  807. 32:35here is added because it is providing
  808. 32:37you that information when and how much
  809. 32:40you need to produce and what quality
  810. 32:42what features you need to add so these
  811. 32:44are couple of the definition you can go
  812. 32:45for right what are the different uh
  813. 32:48production units so uh I'll just go
  814. 32:52through in detail I'll give you another
  815. 32:54diagram how we can uh read these types
  816. 32:56of manufacturing ing processes
  817. 32:59so uh just uh we can understand when we
  818. 33:02are talking about the manufacturing
  819. 33:06processes we can divide into three types
  820. 33:09continuous manufacturing
  821. 33:11process semicontinuous manufacturing
  822. 33:15process or intermittent
  823. 33:19process it will help you to you know
  824. 33:22understand in a better way like the
  825. 33:23diagram I have given in that uh uh PP so
  826. 33:27this will help you to understand and
  827. 33:29then in project management continuous is
  828. 33:31a kind of like steel industry continuous
  829. 33:33we are producing right sugar industry
  830. 33:36salt industry continuously we are sure
  831. 33:38about the demand we are sure about the
  832. 33:40supply so continuously day and night we
  833. 33:42are producing there is no variation
  834. 33:45right when we are talking about
  835. 33:46semicontinuous Supply semicontinuous
  836. 33:48means in between we are doing the
  837. 33:50changeovers so change over because we
  838. 33:53are coming up not with the standard
  839. 33:54product but here what is happening we
  840. 33:56are coming up with with the so many
  841. 33:58different models if you talk about
  842. 34:00automobile industry maruti Suzuki is
  843. 34:03coming up with you know all the vehicles
  844. 34:06with the petrol version maybe 10
  845. 34:09different variants are there diesel
  846. 34:11version 10 different variants are so
  847. 34:13maybe on three production line you are
  848. 34:14manufacturing these 20 models not only
  849. 34:1720 models then different colors so if
  850. 34:19you are providing five colors so just
  851. 34:21imagine 100 sorry uh yeah 20 so 100
  852. 34:27different models will be there so on
  853. 34:29three production lines you will run 100
  854. 34:31different models so that means you need
  855. 34:33to change those model in between so in
  856. 34:36between you are stopping intermittent
  857. 34:38process is either you talk about your
  858. 34:41job shop
  859. 34:42production or batch production in
  860. 34:46pharmaceutical industry you have seen uh
  861. 34:48we produce in batches where the
  862. 34:51ingredients changes but the Machinery we
  863. 34:54are using to convert those raw material
  864. 34:56into finished Remains the Same so steps
  865. 34:59also Remains the Same right so tablet if
  866. 35:02you are producing tablets so only thing
  867. 35:04is you are changing the ingredients and
  868. 35:06then through the same machine through
  869. 35:08the same recipe you are doing that job
  870. 35:10shop maybe restaurant is the best
  871. 35:12example for Job Shop where maybe
  872. 35:15different orders different recipes
  873. 35:17different equipment sometime oven is
  874. 35:19used sometime stove is used sometime
  875. 35:21some other things you are using right so
  876. 35:25that means that is Job Shop and project
  877. 35:27is a kind of big project where you know
  878. 35:31uh it's only one product we are not
  879. 35:32producing in quantity like if you are
  880. 35:35talking about road construction if you
  881. 35:37are talking about real estate industry
  882. 35:39if you are talking about ship building
  883. 35:41so those are kind of examples where we
  884. 35:44talk about you know project management
  885. 35:46so these are you can understand this
  886. 35:48manufacturing processes depending upon
  887. 35:50how much quantity we are producing so
  888. 35:53that different manufacturing processes
  889. 35:54we can Define right so OB objectives of
  890. 35:57production management ensure right
  891. 35:59quantity of goods and services to meet
  892. 36:01the customer demand maintain the right
  893. 36:04quality standard throughout the
  894. 36:06production process you need to ensure
  895. 36:08and delivery of the product services at
  896. 36:10the right time as per the customer
  897. 36:12expectation and deadlines and you need
  898. 36:14to ensure the overall profitability as
  899. 36:17well right so as production manager what
  900. 36:22are the function responsibility product
  901. 36:24and resource selection first you will
  902. 36:26select the product you will design the
  903. 36:28product as for that you will select the
  904. 36:29resources and then production planning
  905. 36:31PPC production planning and control
  906. 36:34department is there which will you know
  907. 36:36help you to identify that model one will
  908. 36:39be this much units will manufacture
  909. 36:42today model two then we Shi to model two
  910. 36:44these many units we will manufacture so
  911. 36:46PPC is helping all the production
  912. 36:48schedules when particular model should
  913. 36:50be made how much it should be made so
  914. 36:52depending upon that data it is
  915. 36:54performing and then machine maintenance
  916. 36:56and replacement how quickly you are
  917. 36:58responding to breakdowns if something is
  918. 37:00happening so that is important because
  919. 37:03that will shut down your uh production
  920. 37:05line temporarily and will you know lower
  921. 37:08the productivity so these are some of
  922. 37:10the strategy for Effective production
  923. 37:12management continuous Improvement you
  924. 37:14need to ensure it's not that one level
  925. 37:16if you have reached at this level go for
  926. 37:18the next level if you reached at this
  927. 37:20level then go for the next level this is
  928. 37:22how continuous Improvement and just in
  929. 37:24time is one example where we can Ensure
  930. 37:27the inventory smooth inventory whenever
  931. 37:29it is required without maintaining
  932. 37:32inventory within your house right total
  933. 37:35productive maintenance already talked
  934. 37:36about and Supply Chain management is
  935. 37:38important you know for Effective
  936. 37:41production management to ensure the uh
  937. 37:44smooth Supply this is a kind of example
  938. 37:46you can see if you are a furniture
  939. 37:48manufacturer so type of furniture you
  940. 37:51have producing and what are the sources
  941. 37:53required you are checking those with the
  942. 37:55market demand and then you are meeting
  943. 37:57those you know whatever standards are
  944. 38:00what type of good uh customer demands
  945. 38:03and then as per that quality durability
  946. 38:05also you can go for right so now we'll
  947. 38:08quickly go through the third scheme
  948. 38:10because already we discussed about
  949. 38:11logistics and distribution management
  950. 38:14right so we talked about when we talked
  951. 38:16about logistics management
  952. 38:18Transportation as one part warehousing
  953. 38:21second Inventory management fulfillment
  954. 38:23and distribution right fourth part so
  955. 38:25this is complete the basic
  956. 38:28objective of logistics management is to
  957. 38:30ensure the right product right time
  958. 38:32right quantity right quality right
  959. 38:34customer right at right location so that
  960. 38:38is the basic purpose of logistics
  961. 38:40management and benefits of if you are
  962. 38:43managing your Logistics in a better way
  963. 38:45so you will be high profitability will
  964. 38:48be there productivity efficiency will be
  965. 38:50there enhanced customer experience they
  966. 38:53will be more satisfied and if you are
  967. 38:55doing the inventory planning
  968. 38:58Bing cost can be reduced Transportation
  969. 39:00Planning Transportation cost can be
  970. 39:02reduced by picking the optimal routes
  971. 39:04and likewise you can be adding more into
  972. 39:08your uh profits right component of this
  973. 39:11warehouse management transportation
  974. 39:13management distribution management we
  975. 39:14have discussed in the initial sessions
  976. 39:16in detail what are softwares we are
  977. 39:18using to ensure these things right so uh
  978. 39:21warehouse management picking packing and
  979. 39:24shipping again how you are managing the
  980. 39:26inventory barcode scanning radio
  981. 39:28frequency identification automation
  982. 39:30warehouses we have automated equipments
  983. 39:33we are there uh those robots are
  984. 39:35managing the inventory during
  985. 39:37transportation management software which
  986. 39:39will help you to identify the you know
  987. 39:41the uh best route depending upon the
  988. 39:43road condition the distance you are
  989. 39:45traveling so that it will help you to
  990. 39:47minimize the overall cost so last
  991. 39:49function is your distribution management
  992. 39:52and distribution management how you are
  993. 39:54recording the order how you are
  994. 39:55Distributing that order right so so
  995. 39:57between that you need to manage the data
  996. 39:59right that is being recorded from the
  997. 40:02customer in terms of order then how you
  998. 40:04are ensuring the inventory then sale
  999. 40:07analysis also depend because log this
  1000. 40:09distribution team is directly
  1001. 40:11interacting with the customer market so
  1002. 40:13they will be their data will be helpful
  1003. 40:15to you know analyze the sales managing
  1004. 40:18the stocks how quickly you can fulfill
  1005. 40:20the order depending upon that only if
  1006. 40:21you have predicted through your
  1007. 40:23distribution Network how the demand
  1008. 40:25going to behave in the next month you
  1009. 40:27can again go for that right so then uh
  1010. 40:32price circulation and
  1011. 40:34control uh through your proper
  1012. 40:37minimizing the inventory and minimizing
  1013. 40:39the distribution cost centralized
  1014. 40:42centralization of data this is important
  1015. 40:44because this data should be centralized
  1016. 40:47but should be shared throughout only
  1017. 40:49that integration and collaboration
  1018. 40:50through all the players can be ensured
  1019. 40:53and the minimum time with minimum time
  1020. 40:55distribution can happen right so these
  1021. 40:58are some of the advantages of
  1022. 40:59distribution management because already
  1023. 41:01we talked about in detail right
  1024. 41:03distribution function so challenges we
  1025. 41:05don't have that much Manpower and uh
  1026. 41:08skilled Manpower required these days to
  1027. 41:11handle the updated uh you know automated
  1028. 41:14uh warehouses inadequate capital in that
  1029. 41:16way we sometimes we don't want to invest
  1030. 41:20into the new technology even if it is
  1031. 41:22available and for better version it is
  1032. 41:24available even then uh we are you know
  1033. 41:27hent to adopt that technology so these
  1034. 41:30are some of the challenges right so now
  1035. 41:32till now we have seen that these this
  1036. 41:35supply chain can be divided into three
  1037. 41:37different streams and how the first
  1038. 41:39stream if you are ensuring the smooth
  1039. 41:41functioning the second stream is
  1040. 41:43depending upon the first stream unless
  1041. 41:45they are not ensuring the supply of the
  1042. 41:47raw material that cannot be processed in
  1043. 41:50the second stream second stream will
  1044. 41:52process the raw material on time with
  1045. 41:54quality with less you know cost most
  1046. 41:57efficient and effective way then only
  1047. 41:59the customer experience can be enhanced
  1048. 42:02to the distribution Network so these are
  1049. 42:05some of the
  1050. 42:06references you can go through so that's
  1051. 42:09all thank you very much

About this transcript

This page contains the full transcript of Lecture 24 : Principle Streams of Supply Chain by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 6,761 words across 1,051 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.