by NPTEL IIT Kharagpur · 6,223 words · 931 segments · language en · Watch on YouTube

Full transcript

  1. 0:01[Music]
  2. 0:22[Music]
  3. 0:25so hello dear students welcome back to
  4. 0:26nptl online course on Logistics and
  5. 0:28Supply Chain management so in the last
  6. 0:31session we discussed about uh the supply
  7. 0:34chain aspects when we are talking about
  8. 0:36the Product Industry and then how it is
  9. 0:39different when we are handling the
  10. 0:40services right and the major challenge
  11. 0:42for services industry we have seen in
  12. 0:44terms of the customized Services we have
  13. 0:47to provide because customer is very much
  14. 0:50part of your uh production process right
  15. 0:53but in case of your product supply chain
  16. 0:56customer is not part of your production
  17. 0:58process and the other big advantage in
  18. 1:01production supply chain is that we can
  19. 1:03utilize the you know free time and
  20. 1:05produce some inventories and later on
  21. 1:07Whenever there will be demand we can uh
  22. 1:10you know push that inventory into the
  23. 1:12market so that smooth supply chain can
  24. 1:14be ensured but on the other hand we have
  25. 1:16seen this is as big challenge in your
  26. 1:18services industry when you know when for
  27. 1:21some time there is no uh customer at
  28. 1:24your uh you know shop and then suddenly
  29. 1:26customers are coming and then uh you
  30. 1:29need to manage the big Q because uh
  31. 1:31because in that way maybe you are
  32. 1:32limited with your resources as well you
  33. 1:34cannot open those many temporary you
  34. 1:37know service channels so that it it can
  35. 1:39be moved uh very quickly right so in
  36. 1:43that way it is again Big Challenge so
  37. 1:46now we will uh continue our discussion
  38. 1:49on supply chain main concept and we'll
  39. 1:51see what are the principal streams of
  40. 1:54Supply Chain management right so again
  41. 1:57I'm Dr vikas takur assistant professor
  42. 1:59Department of humanities and social
  43. 2:01sciences IIT kakur so under this session
  44. 2:03we'll we'll spend couple of session on
  45. 2:06this discussing because this is again
  46. 2:07very important part where we'll again
  47. 2:10divide the complete supply chain into
  48. 2:13three parts right so first stream we'll
  49. 2:15see uh so if I'll highlight with the
  50. 2:19diagram again very basic diagram again
  51. 2:22and again I'm plotting here we have
  52. 2:25suppliers here we have manufacturers
  53. 2:28co-manufacturers here we have
  54. 2:30distribution Network which is reaching
  55. 2:32to our end customer right so first
  56. 2:34stream talks about this whatever we are
  57. 2:38doing here that is your first stream
  58. 2:41right second stream talks about this
  59. 2:43manufacturing things manufacturer
  60. 2:46co-manufacturers all will come in second
  61. 2:48stream third stream talks about you know
  62. 2:52how we are delivering the finished
  63. 2:54product not only driving in between how
  64. 2:57we are storing how we are distribu in
  65. 3:00shipping all those things under the
  66. 3:02third stream right so this concept you
  67. 3:05need to keep in mind while we'll go
  68. 3:07through this session that we have
  69. 3:09divided the three this supply chain into
  70. 3:12three different streams right so we'll
  71. 3:15discuss the concepts under each stream
  72. 3:17in that way and then towards the end
  73. 3:19we'll discuss some uh other key concepts
  74. 3:23related to Supply Chain management and
  75. 3:25obviously uh like we are doing we'll end
  76. 3:28this uh discussion as well with small
  77. 3:30case
  78. 3:31study so already I talked about your uh
  79. 3:34all these streams so you can see this as
  80. 3:37your first stream then your this is your
  81. 3:39second stream and this is your third
  82. 3:42stream we'll see quickly just I'll
  83. 3:44introduce so uh procurement Supply and
  84. 3:48sourcing management the name suggest
  85. 3:50that means how we are acquiring the
  86. 3:52goods and services so while you are
  87. 3:55acquiring the goods and services you
  88. 3:56need to Source you need to purchase you
  89. 3:58need to ensure the smooth supply of the
  90. 4:00supply chain these are some of the
  91. 4:02objectives and the other objectives are
  92. 4:05when you are ensuring that uh
  93. 4:07acquisition of the uh resources in terms
  94. 4:10of your goods or services right you need
  95. 4:13to optimize the cost that is first point
  96. 4:15how cheaply you are getting your
  97. 4:17resources that doesn't mean you need to
  98. 4:19compromise with the quality you need to
  99. 4:22maintain the quality level as well and
  100. 4:24then you need to be efficient as well
  101. 4:26and then you need to ensure that a
  102. 4:30smooth Supply can be ensured through
  103. 4:31your this first stream right if anything
  104. 4:35goes wrong with your suppliers so how
  105. 4:37you will you know come up with your
  106. 4:39contingency plans and maybe you will
  107. 4:41find out some alternative or if you are
  108. 4:44having multiple suppliers only then that
  109. 4:46can be implemented talking about your
  110. 4:48operation material and production
  111. 4:50management simply again says whatever we
  112. 4:53are doing in house that production floor
  113. 4:54we are all the supplies are coming we
  114. 4:57are storing in the storage we are
  115. 4:58ensuring the quality of the incoming we
  116. 5:01are moving step by step those you know
  117. 5:04inventories to the production floor as
  118. 5:07and when required maybe all the model we
  119. 5:10are not preparing right now we talked
  120. 5:12about in every product category we have
  121. 5:14different models right so if we'll talk
  122. 5:16about iPhone iPhone 15 is coming so
  123. 5:19iPhone 15 mini and then iPhone 15 with
  124. 5:22the you know uh standard capacity then
  125. 5:26you have with enhanced capacity pro
  126. 5:28version and those many things are there
  127. 5:30as for the screen size and then if
  128. 5:32you'll talk about automobile industry as
  129. 5:34per the engine capacity color all those
  130. 5:37things fuel you are using right the uh
  131. 5:41the technology you are using so in that
  132. 5:43way those different models you are
  133. 5:45preparing maybe on the same production
  134. 5:47line where you are repetitively you are
  135. 5:50changing from one model to other model
  136. 5:52or maybe you are having some few
  137. 5:54dedicated production lines two three
  138. 5:56production line to produce maybe eight
  139. 5:58or 10 models because one dedicated uh
  140. 6:01for one model production line assembly
  141. 6:03we try to avoid because that much you
  142. 6:06know uh demand is coming from the market
  143. 6:09or not we need to ensure so otherwise
  144. 6:11that capacity will be unutilized so that
  145. 6:13we need to ensure through your
  146. 6:15production process whatever is happening
  147. 6:17within that production floor till we are
  148. 6:19packaging that product and our outgoing
  149. 6:21Quality Control Department is saying
  150. 6:23that as per sampling we have checked and
  151. 6:25this final product is ready we can ship
  152. 6:28it then up to that we'll see the second
  153. 6:30stream how it is working right and then
  154. 6:33talking about the third stream which is
  155. 6:35you know connecting your manufacturer
  156. 6:38with the End customer is your through
  157. 6:40your wholesaler distributor retailers
  158. 6:43and then you are storing in in between
  159. 6:46so all those things will come into
  160. 6:47picture right so your transportation
  161. 6:49part warehousing Inventory management
  162. 6:52how you are fulfilling the order right
  163. 6:54and distribution design whether you are
  164. 6:56doing Doorstep Delivery or your customer
  165. 6:58is coming to your location picking up
  166. 7:00the product or customer is placing the
  167. 7:02order online or customer is physically
  168. 7:05visiting your store but you have to
  169. 7:06deliver the product at the customer
  170. 7:08doorstep so many different models are
  171. 7:10there again we'll talk about that
  172. 7:13distribution how we'll design the
  173. 7:14distribution Network and each
  174. 7:16distribution is having you know effect
  175. 7:19on the cost is one part and the services
  176. 7:22provided to the customer on the other
  177. 7:23part so we'll see how we'll uh um when
  178. 7:27we'll discuss different those
  179. 7:28distribution uh options Network options
  180. 7:32we'll see somewhere how we are you know
  181. 7:34going more responsive so cost is also
  182. 7:37increasing and then we are if we are in
  183. 7:39decreasing the responsiveness so you can
  184. 7:41be efficient in that way so that we will
  185. 7:43discuss this is all about all three
  186. 7:46major streams when we are talking about
  187. 7:47the supply chain so under first stream
  188. 7:50these are the three basic concepts we'll
  189. 7:53try to touch sourcing management
  190. 7:56procurement management and Supply
  191. 7:57management so first you need to
  192. 8:00understand this the flow I have designed
  193. 8:01first is your sourcing and it should be
  194. 8:04the first step only because sourcing is
  195. 8:07developing your stakeholders developing
  196. 8:09your supply chain this is the basic
  197. 8:11difference when we are talking about
  198. 8:12sourcing and procurement sourcing is you
  199. 8:15are setting up your suppliers for long
  200. 8:18term right then comes once sourcing is
  201. 8:21done then you come to your procurement
  202. 8:24part purchasing part then you will
  203. 8:26repetitively you will keep on placing
  204. 8:28the uh you know purchase orders with the
  205. 8:31your uh sourced Partners right and in
  206. 8:33the end you will talk about the supply
  207. 8:36in the first stream how smoothly you can
  208. 8:39ensure that supply chain so these three
  209. 8:41steps we'll discuss for the first stream
  210. 8:44let us talk about the sourcing
  211. 8:47management so obviously we need to
  212. 8:50identify assess and enlist the suppliers
  213. 8:53this is first step of your sourcing so
  214. 8:57before going for that long-term
  215. 8:59strategic relationship with your you
  216. 9:01know sourcing partners are not only one
  217. 9:03day activity or one year or 10 years
  218. 9:06activity as long as you are in that
  219. 9:08market maybe you will try to continue
  220. 9:11with the same kind of sourcing partner
  221. 9:14because it is not uh efficient and
  222. 9:17effective as well when we are talking
  223. 9:19about when we are quickly changing the
  224. 9:21partners right because when you are
  225. 9:23doing this maybe today I'm your partner
  226. 9:26tomorrow if you are leaving me I will be
  227. 9:28partner with someone of your competitors
  228. 9:31right so then you have already shared
  229. 9:33your recipe with me so then in that way
  230. 9:36you can see how it can adversely affect
  231. 9:39your you know way of processing the
  232. 9:42things or whatever secret recipe I am
  233. 9:45having the access to right so that is
  234. 9:47one important thing and then obviously
  235. 9:50once it is done you have to ensure the
  236. 9:52cost efficient acquisition of the goods
  237. 9:54or services whatever you are doing so
  238. 9:56usually for sourcing we are doing the
  239. 9:58tendering procedures listed sources we
  240. 10:02are asking them to you know uh float
  241. 10:05their tenders and there they are
  242. 10:07highlighting all the terms and
  243. 10:09conditions the terms related to pricing
  244. 10:11terms related to delivery terms related
  245. 10:13to Quality and other things right so
  246. 10:16there they are mentioning so this is
  247. 10:18again important step when we are talking
  248. 10:20about tendering procedure in sourcing
  249. 10:23management right so if you have sourced
  250. 10:27you have prepared that list care y right
  251. 10:30after meticulously uh you have done the
  252. 10:32homework then it will provide you
  253. 10:35Competitive Edge as I told you this is
  254. 10:37your strategic movement this is your
  255. 10:40strategic movement anything strategic
  256. 10:42that means long-term effect on your
  257. 10:45competency will be there in the final
  258. 10:47market so in that way you have to ensure
  259. 10:50right so types of sourcing quickly will
  260. 10:53go through Outsourcing obviously we
  261. 10:55discussed when we talked about
  262. 10:57Outsourcing the logistics for first
  263. 10:59party second party third party fourth
  264. 11:01party fifth party sixth party Logistics
  265. 11:03we discussed right
  266. 11:05Outsourcing when we you know keep on
  267. 11:07doing those things we are adding some
  268. 11:09extra uh you know Services which being
  269. 11:13provided from those logistic Partners so
  270. 11:16in case of Outsourcing when we are
  271. 11:18thinking that okay we'll go for
  272. 11:19outsourcing for this particular
  273. 11:20operation let's say packaging is
  274. 11:22something I'm not very good with right
  275. 11:25so let us Outsource this packaging okay
  276. 11:27let us say on our this pen if we are
  277. 11:30manufacturing this marker screen marker
  278. 11:33pointer so you are printing your uh
  279. 11:36brand name on this pen right so printing
  280. 11:39I am not expert in that I'm
  281. 11:41manufacturing Electronics uh Goods but
  282. 11:44printing is something I never heard of I
  283. 11:46have never been there how things are
  284. 11:48done let us Outsource this right now if
  285. 11:51you are Outsourcing that means every
  286. 11:53time you will manufacture this pen you
  287. 11:55will ship this pen to printing agency
  288. 11:58whosoever is your partner and then again
  289. 12:00you know Transportation why don't we
  290. 12:02call them inhouse they will set up one
  291. 12:05facility in our production plant and
  292. 12:07then we'll do that is another kind of
  293. 12:09Outsourcing still it is Outsource but
  294. 12:12that company now has moved within our
  295. 12:14house right and they are doing that
  296. 12:16obviously for getting those facilities
  297. 12:18we'll charge them but this is one model
  298. 12:20of Outsourcing when we are talking about
  299. 12:22Outsourcing we we go either for uh
  300. 12:26backward integration or forward
  301. 12:27integration right backward integration
  302. 12:30let's say this is manufacturer we are
  303. 12:32here manufacturer backward integration
  304. 12:35that means now we will acquire our raw
  305. 12:38material suppliers right so that is
  306. 12:41backward integration let us start
  307. 12:43producing our own raw material we are
  308. 12:45tire manufacturer why we are taking
  309. 12:48steel wires from the steel manufacturer
  310. 12:51let us take the direct uh ore from the
  311. 12:54core and process that ore and we'll
  312. 12:57manufacture the steel wires as well this
  313. 12:59is another industry right so we start
  314. 13:01acquiring our suppliers not acquiring or
  315. 13:04you can start setting up your uh your
  316. 13:07own Supply units so this is backward
  317. 13:09integration when you are going for back
  318. 13:11supply chain forward integration like
  319. 13:15earlier what you were doing you were
  320. 13:16selling your product through local
  321. 13:17retailers or maybe big Bazar or maybe
  322. 13:20some other trading partner wholesaler
  323. 13:23Distributors are there now you are
  324. 13:24setting up your own supply chain like
  325. 13:27Dell is doing Del is is directly selling
  326. 13:30to the customer where customer is
  327. 13:32visiting Dell store room they are giving
  328. 13:35their specification D is designing as
  329. 13:37per that and then shipping uh giving you
  330. 13:40delivering you the final product right
  331. 13:42so that is forward integration anything
  332. 13:44you are doing with this forward supply
  333. 13:46chain that is forward integration
  334. 13:48insourcing is example which I talked
  335. 13:51about that uh in house let us Outsource
  336. 13:54to someone right but that was internal
  337. 13:57party here internally if within our
  338. 14:00manufacturing facility let's say we are
  339. 14:01manufacturing home appliances now
  340. 14:03plastic part is something let's say we
  341. 14:05have the molding facility as well where
  342. 14:08we were producing earlier the molding
  343. 14:09components let's say if we are Flips
  344. 14:12manufacturer we are having molding
  345. 14:14facility maybe other earlier we were not
  346. 14:17manufacturing our products under flips
  347. 14:19brand right now so earlier we were just
  348. 14:23in our molding plants we were supplying
  349. 14:25to uh hbls we were supplying to L&T we
  350. 14:28were supplying to
  351. 14:29all other players in the market all the
  352. 14:32plastic parts which are you know uh
  353. 14:34produced in our molding machines but now
  354. 14:37we realized we have molding capacity
  355. 14:39right let us start our production So
  356. 14:42within house you are Outsourcing your
  357. 14:44all the plastic related components
  358. 14:46production to the molding plant plant
  359. 14:48one is molding plant plant two is your
  360. 14:51where you are assembling the uh those
  361. 14:54products right your uh uh home
  362. 14:57appliances where maybe this this is not
  363. 14:59only one component you you are using for
  364. 15:01manufacturing that appliances maybe many
  365. 15:04other components coming from other
  366. 15:06suppliers but that one component your
  367. 15:08plastic components are coming with from
  368. 15:11within only near sourcing is when you
  369. 15:15want to implement just in time that can
  370. 15:17only happen whenever product is required
  371. 15:19you can ship that so many of the
  372. 15:21organizations they are setting they are
  373. 15:24asking their uh raw material supplier to
  374. 15:27set up their production houses near to
  375. 15:29their facility and they are ensuring
  376. 15:31that we will feed you large enough
  377. 15:34orders so that economies of scale can be
  378. 15:36utilized and you will not be in loss
  379. 15:38that you have because it is strategic
  380. 15:40relationship as long as both suppliers
  381. 15:42and manufacturers are in profit only
  382. 15:45this this complete supply chain can
  383. 15:47survive right it cannot happen that that
  384. 15:50suppliers are running under losses and
  385. 15:53manufacturer is still making loss that
  386. 15:55cannot survive for long run right so uh
  387. 15:58not only just in time sometime what is
  388. 16:00happening I have seen visited one two
  389. 16:02wheeler industry I think PVS what they
  390. 16:05are doing for you know if they are using
  391. 16:08lights and glass all that in their bike
  392. 16:12so you you can see the product is very
  393. 16:15fragile that component is very fragile
  394. 16:17and if you are transporting through you
  395. 16:19long distances maybe scratches may be
  396. 16:21there these kind of things can happen so
  397. 16:24what they are doing they are asking
  398. 16:25their glass manufacturer or the light
  399. 16:27manufacturer to set up their facility
  400. 16:29near to their uh production house so
  401. 16:32that that Justus in time can be ensured
  402. 16:34and the quality can be maintained of the
  403. 16:36product lowcost country sourcing this is
  404. 16:39usually happening if you see uh your u
  405. 16:43high cost countries are like you know
  406. 16:45European nations or us uh kind of thing
  407. 16:49so or if we talk about garment industry
  408. 16:52especially where you know most of the
  409. 16:54players even Walmart kind of players
  410. 16:56they are setting up their you know
  411. 16:58production facility in Bangladesh Bhutan
  412. 17:01or Nepal these kind of cheap locations
  413. 17:03right so in terms of how much you are
  414. 17:05spending for producing one unit that
  415. 17:07also China is also uh has become because
  416. 17:10of their policies that is not low cost
  417. 17:12as such right but their policies are
  418. 17:15that they have you know lower down the
  419. 17:18charges for entry for foreign players
  420. 17:20This Is How They are boosting up their
  421. 17:21economy so many different policy
  422. 17:24measures are there but yes low cost
  423. 17:26country if you are getting to produce
  424. 17:28that product
  425. 17:29you can you know uh save on the
  426. 17:32production cost Global sourcing like we
  427. 17:35discussed this whole Global is One
  428. 17:37Marketplace so you can have access to
  429. 17:40range to new range of skills and
  430. 17:43resources so in terms of uh if you are
  431. 17:47uh sourcing markets you can also Source
  432. 17:50right so not only Indian market you can
  433. 17:52go forign market and then foreign
  434. 17:54suppliers lighting solution China is
  435. 17:57best known for providing the the
  436. 17:58lighting solution even small single LED
  437. 18:02you can just imagine we are using in
  438. 18:03torch or we are using in automobile
  439. 18:06industry right any electronic comp
  440. 18:08electric electronic appliances we are
  441. 18:10using at home we are using at at least
  442. 18:13one that light emitting diode right
  443. 18:15where it is giving the indication
  444. 18:17whether it is on or off like that right
  445. 18:20so those small components are also
  446. 18:22coming from China so they are so good
  447. 18:25with that manufacturing you can leverage
  448. 18:27on that and cut the cost right and then
  449. 18:28quality also they are promising that now
  450. 18:31earlier they were known for quantity but
  451. 18:33now they are moving towards the quality
  452. 18:35as well right so Prime subcontracting
  453. 18:38here we are not sourcing everything some
  454. 18:41part sub assemblies we are uh
  455. 18:44Outsourcing very small example again
  456. 18:46let's say for uh uh for you are
  457. 18:50manufacturing washing machines so in
  458. 18:52washing machine you are using uh one
  459. 18:55obviously one board electrical board
  460. 18:58like circuit right where you are putting
  461. 19:00all the electronic components just to
  462. 19:02control the functionality of the washing
  463. 19:04machine right so many different
  464. 19:06electronic components you are putting on
  465. 19:07that board but you are been good with
  466. 19:09the manufacturing you never uh seen any
  467. 19:12soldering facility how we can go for
  468. 19:15that and even if you are doing that you
  469. 19:17can just imagine that board is printed
  470. 19:19circuit board where you are putting all
  471. 19:21the electronic components if anything
  472. 19:23goes missing whole machine will stop
  473. 19:25working so it is small PCV but is
  474. 19:28equally important it will not turn on so
  475. 19:30what you will do with that big machine
  476. 19:32if that small PCV is not turning on
  477. 19:35right so let us Outsource this to some
  478. 19:37other company who is specialist in this
  479. 19:40field and we can enjoy their services
  480. 19:43captive services operation again example
  481. 19:46of you can you know partially you can
  482. 19:48acquire or wholly you can sometimes go
  483. 19:52so in that way you have more control
  484. 19:54over the quality as well and security
  485. 19:56issues but yes uh that's
  486. 19:59uh economies of scale you need to keep
  487. 20:00in mind whether you will be able to
  488. 20:02generate that much demand or not
  489. 20:04Professional Services like uh if you are
  490. 20:07coming to me I'm lawyer those Services
  491. 20:09you are Outsourcing you cannot do that
  492. 20:12of your own but some some people they
  493. 20:14they seek for special permission where
  494. 20:16they can you know uh fight their own
  495. 20:19cases uh that that provision is also
  496. 20:21there with some uh limitations right
  497. 20:24manufacturing like the example I quoted
  498. 20:26phlips is not having any Manufacturing
  499. 20:28unit but they have the control over
  500. 20:30those co-manufacturer who are producing
  501. 20:33product for the Philips right most of
  502. 20:35the home appliances are being produced
  503. 20:37by their co-manufacturers so vertical
  504. 20:40integration forward and backward
  505. 20:42integration I talked about when you
  506. 20:44acquire your suppliers it is your
  507. 20:46vertical integration under backward
  508. 20:49integration when you acquire your
  509. 20:51forward supply chain distribution supply
  510. 20:53chain any player you Transportation
  511. 20:55agency you acquire or you start your own
  512. 20:57transportation center right so then it
  513. 21:00is forward integration vertical
  514. 21:02integration is what this and horizontal
  515. 21:05integration is when you start acquiring
  516. 21:07phlips will start acquiring havs right
  517. 21:09in the same industry you acquire your
  518. 21:11competitor that is horizontal
  519. 21:13integration but in supply chain context
  520. 21:15vertical integration is our concern few
  521. 21:18or more suppliers obviously uh if you
  522. 21:22are having only single supplier what if
  523. 21:25something goes wrong with that supplier
  524. 21:27and on the other hand and you have two
  525. 21:29three suppliers or maybe n number of
  526. 21:32suppliers many supplier that means that
  527. 21:35quantity will be shared among all those
  528. 21:37suppliers so that means you cannot feed
  529. 21:40large
  530. 21:41orders large order you can feed when you
  531. 21:44have only one supplier but the problem
  532. 21:46with one supplier if anything goes wrong
  533. 21:49at his facility any disaster happens or
  534. 21:52any maintenance related things happen so
  535. 21:55then that means your whole production
  536. 21:57line will stop so so I'm not never uh
  537. 22:01supporting single supplier and never
  538. 22:03supporting too many suppliers I I'm just
  539. 22:05supporting maybe two or three suppliers
  540. 22:08and then we can feed the large order as
  541. 22:11well we can negotiate on that quantity
  542. 22:13cost also quality also if something goes
  543. 22:16wrong with one supplier we can shift to
  544. 22:19other suppliers and that supplier can
  545. 22:21take some time to rectify the errors and
  546. 22:24again come up with the strong promises
  547. 22:26right this is how we can build up the
  548. 22:28strong relationship uh with all the
  549. 22:31stakeholders so few suppliers should be
  550. 22:34there joint venture maruti Suzuki you
  551. 22:37best example where you can uh leverage
  552. 22:41the supply chain of uh maruti here in
  553. 22:44India and Suzuki you can leverage the
  554. 22:47technology of that Virtual Enterprise
  555. 22:49sometime online you know companies are
  556. 22:51there which are doing the survey and all
  557. 22:53those things mcki if you are going for
  558. 22:55hospitals industry they are doing survey
  559. 22:57and then you can find find out their you
  560. 23:00know their information their findings
  561. 23:02their reports can be very very helpful
  562. 23:03when you are designing your insurance
  563. 23:06product related to healthcare industry
  564. 23:07you are designing Healthcare Services
  565. 23:09you are designing Healthcare stations
  566. 23:11right facilities so those kind of things
  567. 23:13also you can leverage on that coming to
  568. 23:16second part under this now sourcing is
  569. 23:19done now we'll start you know purchase
  570. 23:23uh purchasing the quantity from your uh
  571. 23:25soured partner so this will help you to
  572. 23:29you know ensure ontime process and
  573. 23:32continuous monitoring will be ensured
  574. 23:34right so uh after doing all the homework
  575. 23:39we decided these many uh two or three
  576. 23:43suppliers will be there then we need to
  577. 23:45go for the cost also we decided and how
  578. 23:48we can be more productive with our
  579. 23:50stakeholder it's not only if your uh
  580. 23:53sourcing partners are productive in that
  581. 23:56way you will get the supplies with
  582. 23:57minimum cost C right so procurement
  583. 24:00process can be defined as a process
  584. 24:02responsible for overseeing and
  585. 24:04administering all the activities
  586. 24:06involved in acquiring the material
  587. 24:08product goods and services which are
  588. 24:10required to ensure the smooth operation
  589. 24:13efficient operation effective operation
  590. 24:16within your production facility right so
  591. 24:19repetitively you will procure so what
  592. 24:22are the
  593. 24:23fundamentals while you are going for
  594. 24:25procurement you need to understand first
  595. 24:27your purchasing portfolio purchasing
  596. 24:30portfolio will help you to understand
  597. 24:32what are the products you are buying
  598. 24:34what are the quantity you are buying in
  599. 24:36what orders you are how frequently you
  600. 24:38are buying number of lots you are buying
  601. 24:40right size of the lot what you are
  602. 24:42buying quality what is expected so if
  603. 24:45you know all these things you can be in
  604. 24:47better position to negotiate with your C
  605. 24:50uh raw material supplier right if you
  606. 24:52feeding them large order like what what
  607. 24:54Walmart is doing Walmart is saving a
  608. 24:58huge use with their raw material
  609. 25:00suppliers because they are having
  610. 25:01limited suppliers and they are feeding
  611. 25:04continuously large orders when you are
  612. 25:07feeding large orders those economies of
  613. 25:09scale you can reduce you can negotiate
  614. 25:11the price as well that is one thing you
  615. 25:13need to know organize your purchases
  616. 25:16then once you know the pro portfolio of
  617. 25:19purchasing right then you can organize
  618. 25:22in that way that I will require let's
  619. 25:24say uh for one month I need three
  620. 25:27deliveries load one lot two lot three I
  621. 25:29want this much size lot one this much
  622. 25:31size lot two and three right you need to
  623. 25:35organize your purchase when the uh
  624. 25:37purchase order will be initiated right
  625. 25:39when you will generate the PO when
  626. 25:41purchase order will reach to your uh uh
  627. 25:44your sourcing partner how they will
  628. 25:47process everything that information what
  629. 25:49is required quantity quality and then
  630. 25:52variation in the component what is
  631. 25:53required so that also you can organize
  632. 25:56then con you need to control the
  633. 25:58inventory in terms of either you are
  634. 26:00talking about finished goods or raw
  635. 26:02material or semi-finished Goods that you
  636. 26:05you need to control through procurement
  637. 26:07process only if you are keeping too much
  638. 26:09in your semi-finished inventory that
  639. 26:11means you need to push that inventory
  640. 26:13first in the market right otherwise you
  641. 26:16never know anything will come like what
  642. 26:18happened with bs3 petrol engine and bs4
  643. 26:21diesel engines when in Delhi completely
  644. 26:24phased out so then there was a rush
  645. 26:26among two wheelers four wheelers to sell
  646. 26:29those products with you know 50% lesser
  647. 26:32price right so that you need to keep in
  648. 26:34mind procurement function must be
  649. 26:36included in product development is a
  650. 26:38very very important part whenever you
  651. 26:40are coming with your R&D team and you
  652. 26:43are developing new product if you are
  653. 26:45including your procurement team into
  654. 26:47that what extra benefit you will get see
  655. 26:51procurement team is having better idea
  656. 26:53which material will be
  657. 26:55beneficial they will they can analyze
  658. 26:57the performance the quality the quantity
  659. 27:00the you know price as well right so then
  660. 27:02they have the access how many raw
  661. 27:04material suppliers of that particular
  662. 27:06material are there available easily
  663. 27:08available can we do the just in time
  664. 27:10with them can we ensure the quality with
  665. 27:12existing raw material suppliers so it
  666. 27:14will include in R&D so then then it will
  667. 27:18be very beneficial when we are going for
  668. 27:20commercializing the same uh you know the
  669. 27:23product right risk management and
  670. 27:25introduction of performance indicators
  671. 27:28so during smooth procurement is
  672. 27:31happening you can avoid the risk of
  673. 27:33going stock out in your inventory so in
  674. 27:37your store always you are maintaining
  675. 27:38the inventory and from the store always
  676. 27:42the smooth supply of your raw material
  677. 27:45is going to the production lines right
  678. 27:48so that you can ensure through your uh
  679. 27:51when whenever you have that minimum safe
  680. 27:53inventory with you identify your
  681. 27:55customer needs obviously through R&D
  682. 27:58only then you will uh design your
  683. 28:01product while your uh your customers are
  684. 28:04giving the inputs what are the
  685. 28:06requirements look outside your Market
  686. 28:09sometimes for some solutions you need to
  687. 28:13give you know out out of the box
  688. 28:15thinking so then you need to come up
  689. 28:18with some new Solutions right so
  690. 28:20whatever your competitors have been
  691. 28:21doing even the best players in the
  692. 28:23market have been doing if that is not
  693. 28:25sufficient enough you need to think out
  694. 28:27of the box right then manage and
  695. 28:29prioritize relationship with your
  696. 28:31vendors your stakeholders your suppliers
  697. 28:34only then long-term relationship are
  698. 28:36possible Right ensure collect spend data
  699. 28:39now this is
  700. 28:41important you need this is we have so
  701. 28:43many different softwares to you know to
  702. 28:45do your spending analysis right how much
  703. 28:48you are spending be in your you know now
  704. 28:50in Mobile also when uh apps are coming
  705. 28:54those apps are fetching data from your
  706. 28:57uh PayPal PTM or UPI whatever you are
  707. 29:00using and then giving you in the end of
  708. 29:03the month giving you the complete
  709. 29:04information this much you are spending
  710. 29:07in uh purchasing the grocery item this
  711. 29:10much you are spending in uh your you
  712. 29:13know traveling around this much you are
  713. 29:15spending for uh getting the fuel this
  714. 29:17much you are spending like all uh on
  715. 29:21your clothing items this much you are
  716. 29:23spending for your household it so
  717. 29:24whatever you can do the spending
  718. 29:26analysis and then you can say okay I'm
  719. 29:28getting the maximum material from this
  720. 29:30in Industry how this is this spend data
  721. 29:33analysis is helpful if repetitively I'm
  722. 29:37giving feeding many large orders to one
  723. 29:39player why don't I enjoy that you know
  724. 29:42negotiation power with that player right
  725. 29:44so that analysis we can do this is one
  726. 29:46point there are so many other things you
  727. 29:48can do with this spending data right so
  728. 29:50you can uh improve your efficiency and
  729. 29:54Effectiveness and then if you have that
  730. 29:56data you can be at that negotiation
  731. 29:59position what are the steps quickly will
  732. 30:01go for procurement first you will
  733. 30:03identify the source and plan how much
  734. 30:05inventry you need to purchase then you
  735. 30:08will choose and select the suppliers out
  736. 30:10of supplier one supplier two supplier
  737. 30:12three I'll pick supplier two this time
  738. 30:14or maybe 60% order I'll give to him
  739. 30:17maybe then uh rest uh 20% I'll give to
  740. 30:21him rest maybe 20% I'll give to him
  741. 30:24right why 60% because this supplier is
  742. 30:27very responsible price are very less
  743. 30:29quality is always high or we are doing
  744. 30:33that vendor rating we are rating all our
  745. 30:36vendor we'll see one session on vendor
  746. 30:37rating if we'll get time so how vendor
  747. 30:41rating is helping us to find out which
  748. 30:44uh order should be given to which
  749. 30:46supplier right and then negotiating the
  750. 30:48contract here we are discussing the
  751. 30:51quantity terms we want the quality terms
  752. 30:55we want the payment how payment will be
  753. 30:58done usually we are saying after
  754. 30:59receiving the material within 90 days
  755. 31:01you'll get the payment these 90 days are
  756. 31:03required to you know check in inspect
  757. 31:06the incoming quality right and then uh
  758. 31:09then then invoice will be generated will
  759. 31:12be passed through the accounting section
  760. 31:14will be passed through then uh and
  761. 31:16finally payment will be done right this
  762. 31:17is how it is being done or if any
  763. 31:21conflict is there how this will be done
  764. 31:24how it will be negotiated then actually
  765. 31:26we will place the first order once the
  766. 31:28first order copy is generated there you
  767. 31:30are documenting every term and condition
  768. 31:33in that first order this is another step
  769. 31:36accelerating the order let's say now
  770. 31:39like the example I quoted that two
  771. 31:40wheeler industry bs3 engine petrol
  772. 31:43engine were phased out they started
  773. 31:45selling on 50% lesser cost but let's say
  774. 31:49still our raw material suppliers are
  775. 31:50maintaining some inventory for related
  776. 31:52to bs3 engines so that means they should
  777. 31:55be able to esate that inventory quickly
  778. 31:58to the production line otherwise that
  779. 32:00will be cost to us if they are supplying
  780. 32:03after 10 days it will be difficult us to
  781. 32:06again assemble that and push in the
  782. 32:08market again we have to lower down the
  783. 32:10price right or this is one scenario
  784. 32:12another scenario if suddenly one
  785. 32:14supplier something goes wrong second
  786. 32:17supplier should be able to accelerate
  787. 32:18the order should be immediately you know
  788. 32:21providing the services if our
  789. 32:23forecasting failed sometimes and we are
  790. 32:26getting large order we should not stop
  791. 32:28saying that we cannot feed after that we
  792. 32:31should be able to do that right so that
  793. 32:33is one thing then reip and inspection of
  794. 32:35the purchase once it is done we will
  795. 32:38inspect that material and then if it is
  796. 32:40okay we will store that and then move to
  797. 32:43the production line after that only
  798. 32:45invoice and payment will be done and we
  799. 32:48are doing this on time so that the
  800. 32:50relationships can be managed so this is
  801. 32:53one complete cycle how the procurement
  802. 32:55is happening so you can just just see
  803. 32:58one example of procurement management
  804. 33:00where Construction Company what are the
  805. 33:02supplies required right so you need
  806. 33:05cement steel and uh all those other
  807. 33:09things you you require to you know uh
  808. 33:12electrical wiring electrical equipments
  809. 33:15all those things are required when you
  810. 33:16are coming up with you know no new new
  811. 33:18project right so you need to ensure the
  812. 33:21smooth Supply only then the uh that
  813. 33:24construction can be finished on time
  814. 33:26right it's not only the tender will get
  815. 33:30the person who is giving the minimum
  816. 33:32quat no so the delivery of the project
  817. 33:35is also very important and in in that
  818. 33:37Way project delay is major major concern
  819. 33:40the project management Industries are
  820. 33:42facing these days
  821. 33:44right so if we'll talk about procurement
  822. 33:47versus sourcing I just talked about this
  823. 33:49is the first stage where we are
  824. 33:51developing the you know supply chain and
  825. 33:54procurement involves procuring goods and
  826. 33:56services it here focus is what are the
  827. 33:59supplies here focus is who is making
  828. 34:02those supplies right that is also
  829. 34:03equally important part right and then
  830. 34:06leverages Supply chains to ensure a
  831. 34:08stady flow of inputs and supply to the
  832. 34:11organization sourcing is concerned with
  833. 34:13building and managing the supply chain
  834. 34:15which I talked about procurement is
  835. 34:17primarily concerned with already running
  836. 34:19Supply chains are there procurement is
  837. 34:22just ensuring the smooth Supply but
  838. 34:24sourcing is building up new Supply
  839. 34:26chains right so now after ensuring your
  840. 34:30sourcing is done now purchasing you are
  841. 34:33repetitively you know placing the order
  842. 34:35with your uh sourced Partners now the
  843. 34:38third step under the final step under
  844. 34:40your first team is Supply management
  845. 34:42which the name suggest that you need to
  846. 34:44ensure the smooth continuous supply of
  847. 34:47the goods products whatever you are uh
  848. 34:51you know uh taking from your suppliers
  849. 34:53now see to ensure the smooth Supply you
  850. 34:56should have proper integration with your
  851. 34:58suppliers integration means
  852. 35:00technologically you should be integrated
  853. 35:02so that quick information can be shared
  854. 35:05if any higher demand is coming from the
  855. 35:07market that should be immediately shared
  856. 35:10if there you are feeling that there will
  857. 35:12be sudden drop in the demand then the
  858. 35:15supplier should not produce excess
  859. 35:17inventory raw material that also should
  860. 35:20be communicated so this is one Element
  861. 35:23important element to ensure the smooth
  862. 35:25Supply because smooth Supply is
  863. 35:27targeting our uh this concept of we
  864. 35:31should not stock
  865. 35:33out and we should not have excess
  866. 35:39stock this will be ensured through your
  867. 35:42proper Supply management right and it is
  868. 35:44very much function of your preproduction
  869. 35:46Logistics and inventory management where
  870. 35:49we are targeting our resources whatever
  871. 35:52resources we are using should be
  872. 35:54supplied smoothly to through our your
  873. 35:58first supply chain first stream right
  874. 36:01what is the role of Supply management
  875. 36:03identifying sourcing negotiating and
  876. 36:05procuring a service or good that is
  877. 36:08essential to a company's ongoing
  878. 36:10operations right so whenever it is
  879. 36:12required you need to identify out of the
  880. 36:15listed sources you will pick the best
  881. 36:18supplier always not you will pick the
  882. 36:20best supplier because you need to retain
  883. 36:22the suppliers which may be performing
  884. 36:25bad on some parameters of price quality
  885. 36:28delivery they are struggling to ensure
  886. 36:30the smooth delivery but then again I
  887. 36:33told you those few suppliers you need to
  888. 36:35maintain two three four suppliers then
  889. 36:37few word is very subjective Maybe for
  890. 36:41One industry few is maybe if you are as
  891. 36:44automobile industry you are Outsourcing
  892. 36:46tires from mrf right so then only one
  893. 36:50you know you you will use in all the
  894. 36:53models you will use only one in one
  895. 36:55product category if you are using B on
  896. 36:57Tire maybe for other product then you
  897. 37:00will use that but then if you are
  898. 37:02talking about some other thing right if
  899. 37:05you are using fuel pump or fuel filter
  900. 37:08then it can come from two three
  901. 37:10suppliers right so that b you are buying
  902. 37:13from b or some other supplier right so
  903. 37:15that means this fuel supplier again
  904. 37:17subjective related to your uh nature of
  905. 37:20the industry we are dealing with then
  906. 37:22formulating a strategy for developing
  907. 37:24and maintaining a relationship another
  908. 37:26very important with the supply Supply
  909. 37:27management because your supplies will be
  910. 37:32insured and your suppliers are only
  911. 37:34accountable for ensuring those smooth
  912. 37:36supplies right utilizing technology and
  913. 37:38procedures that will help you to
  914. 37:40integrate better with your
  915. 37:42suppliers and then we need to consider
  916. 37:45the theories of supply and demand so
  917. 37:47that we can you know fix that price and
  918. 37:49we can ensure that smooth Supply is
  919. 37:53happening and demand is also generated
  920. 37:56in that way so that we will ensure
  921. 37:58through your uh supply chain process
  922. 38:01right so these all are the uh three
  923. 38:04major components when we talk about the
  924. 38:06first stream right in the second uh next
  925. 38:09session we'll start discussion about
  926. 38:11your second stream supply chain so these
  927. 38:14are the references for this uh complete
  928. 38:17uh topic of uh uh supply chain three
  929. 38:20streams right so these are the
  930. 38:22references you can refer uh that's all
  931. 38:24for this session thank you very much

About this transcript

This page contains the full transcript of Lecture 23 : Principle Streams of Supply Chain by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 6,223 words across 931 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.