  1. 0:01[Music]
  2. 0:22[Music]
  3. 0:25so hello dear friends welcome back to
  4. 0:27nptl online course on Logistics and
  5. 0:29Supply Chain management
  6. 0:30so uh in the last couple of sessions we
  7. 0:32started discussion on lean Logistics and
  8. 0:35uh uh we discussed various aspects of
  9. 0:38lean Logistics we started discussion on
  10. 0:41implementing lean Logistics uh through
  11. 0:43various uh methodologies and framework
  12. 0:45and in that we discussed uh about uh uh
  13. 0:49the we will discuss about the challenges
  14. 0:52also and one case study so uh uh here uh
  15. 0:56we'll discuss the second approach which
  16. 0:58we can use for implementing lean
  17. 1:00Logistics is a dmac approach and uh like
  18. 1:03I told you that this uh the methodology
  19. 1:06is used to implement Six Sigma in your
  20. 1:08process so that we can reduce the
  21. 1:11defects only up to
  22. 1:123.44 per million opportunity that is Six
  23. 1:15Sigma okay so how we can achieve that
  24. 1:20accuracy level is you need to Define
  25. 1:23what you are doing as a process you need
  26. 1:26to measure that right then again you
  27. 1:28need to analyze how you are doing is
  28. 1:31there any deviation from the actual plan
  29. 1:34right where the bottlenecks are or where
  30. 1:37the problems you are facing related to
  31. 1:39delivery related to wrong product
  32. 1:41shipment related to wrong order
  33. 1:43recording related to packaging damaged
  34. 1:47during shipment right related to
  35. 1:49anything so that you need to analyze how
  36. 1:51we can improve that whether we need to
  37. 1:53improve the technology so that we can
  38. 1:56share exact information coming from the
  39. 1:58customer if customer is giving you some
  40. 2:01uh requirements that when you will
  41. 2:03prepare uh the food maybe the spicy
  42. 2:06related to uh it should be less spicy
  43. 2:09right so then those instruction should
  44. 2:11be exactly supplied to your kitchen
  45. 2:13right so how you can ensure with better
  46. 2:16you know uh visibility and traceability
  47. 2:18throughout the distribution Network so
  48. 2:21then you need to control it after
  49. 2:23improving again you will see how it is
  50. 2:25moving and then uh whether it is going
  51. 2:28as per the expectations you improve
  52. 2:30something so maybe new technology you
  53. 2:32need to analyze whether it is going as
  54. 2:34per that or not right so first is Define
  55. 2:37phase you will Define scope goal and fin
  56. 2:39financial performance targets where you
  57. 2:42want to improve we want to improve uh
  58. 2:47the recording the orders process so when
  59. 2:52we are recording the order some customer
  60. 2:54information is missing so that's why we
  61. 2:56are not able
  62. 2:57to uh provide the exact Services
  63. 3:00required by the customer then measure
  64. 3:02the phase what is the current state of
  65. 3:05performance how many times we are
  66. 3:07recording wrong orders right and what
  67. 3:09are the reasons right we need to
  68. 3:11identify the root cause why that is
  69. 3:14happening so we need to understand the
  70. 3:16complete cycle from customer the order
  71. 3:20is coming to let's say J right Jato is
  72. 3:25again sharing this information with the
  73. 3:27restaurant
  74. 3:30restaurant again sharing information
  75. 3:32with the career partner that now the
  76. 3:35product is ready to be shipped and then
  77. 3:38it is finally reaching to the customer
  78. 3:41now this information should be shared
  79. 3:43with the Jato and with restaurant as
  80. 3:46well and with the career partner as well
  81. 3:48right so if I'm saying that it should be
  82. 3:51less spicy that information is very very
  83. 3:53important for the restaurant if I'm
  84. 3:55sharing that I'm placing the order right
  85. 3:57now but I don't want within 30 minutes
  86. 3:59if your policy says it will be delivered
  87. 4:01within 30 minutes because maybe I will
  88. 4:03be free late by my office from office
  89. 4:06right so after 1 hour 30 minutes you
  90. 4:08deliver me this product right so then
  91. 4:11that information is required for career
  92. 4:13partner how I can at that time I can
  93. 4:15utilize that and maybe I can deliver
  94. 4:18some other orders right so that
  95. 4:20information you need to share improve
  96. 4:23phase how you can design the process in
  97. 4:26a better way information sharing that
  98. 4:28means the platform you are designing how
  99. 4:31all the stakeholders can be included in
  100. 4:34that platform if you are coming with the
  101. 4:36new processes maybe you CH you need to
  102. 4:39change the recipe how you are preparing
  103. 4:41the food then you you also include those
  104. 4:44uh kpis in your uh process Improvement
  105. 4:48part right and uh uh then control phase
  106. 4:51will happen when you'll actually track
  107. 4:53the performance indicators and which
  108. 4:55with your actual output how you are
  109. 4:57doing that and you will see is there any
  110. 5:00deviation
  111. 5:02right means your this
  112. 5:05actual output whatever you are doing
  113. 5:08whatever your standards
  114. 5:11were then you will see is there any
  115. 5:14deviation is there any deviation yes no
  116. 5:18that means you are doing perfectly fine
  117. 5:20yes then you need to change the again
  118. 5:22the process from where your actual
  119. 5:24output is coming out right so that way
  120. 5:26you need to plan the control phase and
  121. 5:29you need to revie the performance again
  122. 5:30and again so another lean Logistics tool
  123. 5:33is just in time approach this is because
  124. 5:37uh we want to get rid of in managing the
  125. 5:40inventory storing the inventory and then
  126. 5:43while storing the inventory we saw that
  127. 5:45we are damaging sometimes and sometime
  128. 5:48inventory is expiring in the stock only
  129. 5:50right so to avoid all those issues can
  130. 5:53be go for a kind of system where
  131. 5:55directly raw material is coming to the
  132. 5:58production lines and it is streamlined
  133. 6:01with the production process and that
  134. 6:03production is happening and packaging is
  135. 6:05done and then move to the final uh
  136. 6:08Dispatch Center from where the mark uh
  137. 6:10from to different Market locations the
  138. 6:12final product can be shipped so how this
  139. 6:15will happen if we are able to implement
  140. 6:18this so this will not eliminate the
  141. 6:21waste in the inventory this will also
  142. 6:23improve the quality why quality will be
  143. 6:26improved because when you are keeping
  144. 6:27the inventory in your Warehouse
  145. 6:29obviously at that time because when
  146. 6:32handling is involved you are
  147. 6:33transporting from here to there keeping
  148. 6:36again to other point location and then
  149. 6:38maybe on 100 day you are processing it
  150. 6:40to the production line right in that way
  151. 6:43quality will be degraded right and if
  152. 6:45you're talking about some electronic
  153. 6:47appliances electronic components you are
  154. 6:49using and if those electronic components
  155. 6:51are left just like that for 100 days or
  156. 6:54maybe for 3 months 4 months so then you
  157. 6:57can imagine so if fresh raw materal
  158. 6:59coming and you are processing it on the
  159. 7:01there is no match if you are talking
  160. 7:03about quality right so this will only
  161. 7:05happen when you have close coordination
  162. 7:07with your suppliers and how that will
  163. 7:10happen these are eight steps you need to
  164. 7:13design the process in that way where you
  165. 7:15can say the raw material is directly fed
  166. 7:18to your production lines and you need to
  167. 7:21manage the overall quality of the uh
  168. 7:24system right it's not only quality of
  169. 7:26the product your quality of work life
  170. 7:28quality of equip ment quality of
  171. 7:30production floor right quality of all
  172. 7:33the stakeholders involved in that
  173. 7:35process right and then pull canman so
  174. 7:38canman production cards you can use
  175. 7:40right to uh just pull you can break the
  176. 7:43order into small parts and then you can
  177. 7:45be uh you know assigning different uh uh
  178. 7:50responsibilities to different vendors as
  179. 7:52per the requirement so then you need to
  180. 7:55establish strong vendor relationship
  181. 7:57only then just in time will happen
  182. 8:00and then F tune the inventory that means
  183. 8:03if you are not maintaining that minimum
  184. 8:06stock you have to be very very fine with
  185. 8:09forecasting with Predictive Analytics
  186. 8:11with uh your observing the customer
  187. 8:14buying Behavior they're buying uh
  188. 8:17patterns right and if any fluctuations
  189. 8:20are there in the market because of Any
  190. 8:23uh disruptions those also you should
  191. 8:26consider while planning this otherwise
  192. 8:28just in time will not work because if
  193. 8:31you plan some just in time way on the
  194. 8:34way something goes wrong there is Strike
  195. 8:36right there is some maybe flood is there
  196. 8:39maybe some natural disaster is there so
  197. 8:42then how you will feed your production
  198. 8:43line so that's why we always try to be
  199. 8:47safe and try to keep some inventory
  200. 8:49right but another very important thing
  201. 8:51when we are talking about the vendor
  202. 8:52relationship can be develop one or two
  203. 8:55big Benders near to our manufacturing
  204. 8:57house so that they can we we can feed
  205. 9:00them large orders and they are also
  206. 9:02happy to set up their production units
  207. 9:04near to our production line so that
  208. 9:07directly order can be those raw material
  209. 9:09can be fed to the production line and
  210. 9:12you need to develop those kind of skills
  211. 9:15and capabilities with within uh house
  212. 9:18and with your stakeholders as well only
  213. 9:21then that streamline just in time will
  214. 9:23happen your starting with your recording
  215. 9:25the order from the customer that channel
  216. 9:27should also be very very strong then you
  217. 9:29cannot say that your Regional sale team
  218. 9:32is uh collecting the data it is
  219. 9:35processed by District level then it is
  220. 9:37processed by state level then it is
  221. 9:39processed by Regional level then
  222. 9:41National level this will not happen then
  223. 9:44how the quickly that information
  224. 9:46feedback is uh entered by the customer
  225. 9:50how it uh quickly you can share
  226. 9:52throughout your network so only then
  227. 9:54just in time is possible and then you
  228. 9:56need to refine the product and processes
  229. 9:58as well uh product means the components
  230. 10:02uh you need to design those components
  231. 10:04which can can be ured through just in
  232. 10:07time environment right so and processes
  233. 10:11also it should not be that you one
  234. 10:13process is taking too long and that
  235. 10:15other process is baiting right that
  236. 10:17should also not happen if that is
  237. 10:19happening you need to define the process
  238. 10:22bottleneck right and you need need to
  239. 10:24remove those process bottlenecks and in
  240. 10:27the end the key performance inrig s you
  241. 10:29will uh analyze using your uh uh jit how
  242. 10:34efficiently the orders are delivered how
  243. 10:37quickly the orders are delivered how
  244. 10:39efficiently you are recording the orders
  245. 10:41how efficiently you are reducing the
  246. 10:44inventory cost handling cost damaging
  247. 10:47cost obsolute going obsolete means uh
  248. 10:50expired inventory in terms of that you
  249. 10:52are managing that so that also you need
  250. 10:55to you can track that and you can surely
  251. 10:57you will observe that uh Improvement in
  252. 11:00the performance so these all are the
  253. 11:02steps already I discussed about these
  254. 11:05steps the next methodology is 5S
  255. 11:09approach we discussed this approach in
  256. 11:11quality tools as well so this simple
  257. 11:14concept here is Japanese concept how we
  258. 11:17can keep our workstation sorted okay and
  259. 11:21uh uh so that it is sort not only sorted
  260. 11:25it is clean standardized efficient and
  261. 11:28safely we can there we can reduce the
  262. 11:31accidents rates as well when we are
  263. 11:32saying that we are implementing 5S
  264. 11:35housekeeping approach right so again
  265. 11:39this approach was initiated in J uh
  266. 11:42Japan and mostly the these approaches
  267. 11:45have come from Japan only because their
  268. 11:49uh production facilities are like uh no
  269. 11:52match so quickly if you'll go through
  270. 11:54these steps you can see first is sort
  271. 11:57you need Siri you need to sort the the
  272. 11:59things like this so that you need not to
  273. 12:01search where the key will be where the
  274. 12:04Len key will be where the plucker will
  275. 12:05be where the hammer will be and then
  276. 12:07Hammer also different size of hammers
  277. 12:09are there key also different size of
  278. 12:11keys are there so if all the time you
  279. 12:13are looking for your equipment so that
  280. 12:16is wastage of time so you might have
  281. 12:18seen when you go for your uh any service
  282. 12:21station for repairing your car or
  283. 12:22routine Services they usually try to
  284. 12:25arrange in that way so that easily you
  285. 12:27can identify but this is one work
  286. 12:29station you just imagine the
  287. 12:31manufacturing facility where thousand of
  288. 12:33people are working and one repetitive
  289. 12:36action you are doing if uh for the day
  290. 12:39you are producing 50,000 products so one
  291. 12:42person going to repeat His function
  292. 12:45activity whatever he's doing
  293. 12:47approximately 50,000 times so you just
  294. 12:50imagine 50,000 times you are just
  295. 12:52looking where is your Hammer where is
  296. 12:54your key where is your screwdriver right
  297. 12:56so that cannot happen not only those
  298. 12:58equipments even the supply material how
  299. 13:01you are keeping the material within the
  300. 13:02store if you are looking for so that in
  301. 13:06that way outer M automated warehouses
  302. 13:08will help you to identify where the
  303. 13:10product is you can just scan the code
  304. 13:13will identify to locate the you know uh
  305. 13:16location and you can easily pick that
  306. 13:18even if manually not your robot will
  307. 13:21pick and will deliver on your production
  308. 13:23line and we need to shine this we need
  309. 13:26to maintain the cleaniness and obviously
  310. 13:28in manufacturing production supply chain
  311. 13:31standardization is something we want to
  312. 13:33achieve this stage as soon as possible
  313. 13:36because once the process is standardized
  314. 13:39we are relaxed that now we will be uh
  315. 13:43moving towards the productivity we will
  316. 13:45be more efficient we can reduce the cost
  317. 13:48we can improve our margins because now
  318. 13:50the rejection is also reduced like we
  319. 13:52talked about the process rejection and
  320. 13:54then in the end we need to sustain that
  321. 13:56environment of continuous Improvement
  322. 13:59the next approach is Kaizen Kaizen is
  323. 14:03actually again uh Kaizen is made up of
  324. 14:06two words kaen so change uh for
  325. 14:10improvement right so small small steps
  326. 14:13Improvement will be there so the B very
  327. 14:15basic function if you'll see how we can
  328. 14:17do that we need to plan first then
  329. 14:19accordingly we will do that we'll study
  330. 14:21the effects and we'll continue that
  331. 14:24process if the effects are in the
  332. 14:25positive direction see the approach here
  333. 14:28is is the not continuous Improvement
  334. 14:31continual
  335. 14:33Improvement right Kaizen focuses on
  336. 14:37continual Improvement what is the
  337. 14:38meaning if I'm targeting Improvement
  338. 14:41let's say this is 2% Improvement then
  339. 14:43first achieving this 2% Improvement I'll
  340. 14:46try to stabilize it for some time then
  341. 14:49again I'll go for again 1% Improvement
  342. 14:51I'll try to stabilize it again then
  343. 14:54again I'll go for 2% Improvement we'll
  344. 14:56stabilize here so the best part if you
  345. 14:59talk about continuous Improvement
  346. 15:00continuously you are improving so if you
  347. 15:03fail at this point suddenly you will
  348. 15:05come down to zero right again you need
  349. 15:08to abort the whole mission and whatever
  350. 15:11you invested will be waste but in this
  351. 15:13case if you are failing here you will be
  352. 15:16at at least you have stabilized so at
  353. 15:19least you have stabilized this stage so
  354. 15:22that means still you are at there is
  355. 15:25loss you implemented you tried something
  356. 15:27new but that could not happen so this is
  357. 15:30the uh Kaizen approach make it better
  358. 15:33make it faster make it cheaper and the
  359. 15:35other very important characteristics
  360. 15:38when we talk about Kaizen projects is
  361. 15:40small steps improvements so investment
  362. 15:43required to improve those small things
  363. 15:45is not us in that way right and very
  364. 15:48small efforts are required from the
  365. 15:50employees as well so in that way it is
  366. 15:52safe approach right you can see earlier
  367. 15:55how they were lubricating their gear box
  368. 15:58with the o it was so difficult now after
  369. 16:01just small Improvement how much cost is
  370. 16:03there earlier it was very difficult to
  371. 16:06inspect the condition of the belt
  372. 16:08because it was completely covered so
  373. 16:10just change in the design how quickly
  374. 16:12you can do you just imagine how long a
  375. 16:15person is taking when you are going for
  376. 16:17repairing your tire and then if we
  377. 16:19talking about F1 race so only 5 Seconds
  378. 16:235 seconds are even more than for uh
  379. 16:26replacing all the four tires and if in
  380. 16:28in this case this is 5 to 10 minutes no
  381. 16:31one is taking minimum 30 minutes person
  382. 16:33is taking to replace the tire so these
  383. 16:37small steps Improvement how we can you
  384. 16:40know big picture if you'll see the
  385. 16:42Improvement will be very very big and
  386. 16:44this is obvious from this that
  387. 16:46Improvement is Big single minute
  388. 16:49exchange of D is very uh again uh
  389. 16:52prominent concept we use in uh
  390. 16:55manufacturing where we say that if you
  391. 16:57are doing any change over that should be
  392. 17:01done within less than 10 minutes single
  393. 17:05digit minutes right so if you're
  394. 17:07changing D so that is little technical D
  395. 17:09we are changing in the molding machines
  396. 17:11right or simple if you say again if
  397. 17:14you'll take about the example of uh
  398. 17:17restaurant if right now some person
  399. 17:20order for non-v the next person order
  400. 17:22for B and he's completely bed right so
  401. 17:24you need to clean and you need to change
  402. 17:26the things the recipe and some
  403. 17:28ingredients right so when you are
  404. 17:30changing that how quickly you are
  405. 17:32changing that or can we go for separate
  406. 17:34workstation for B for non-b and if
  407. 17:37you're going for that is it cost
  408. 17:39efficient are we getting enough orders
  409. 17:41for b or enough orders for nonb that
  410. 17:44also we need to take care if not enough
  411. 17:46orders so on single workstation only OV
  412. 17:49only we need to cook all the items so
  413. 17:51how quickly we'll change over you just
  414. 17:53see Toyota volt maker earlier they were
  415. 17:55taking 8 hours now 58 second you just
  416. 18:00imagine these small small steps
  417. 18:01Improvement how much they are
  418. 18:03contributing mitui so 24 hours 2.7
  419. 18:07minutes Hitachi diecast earlier they
  420. 18:09were taking 75 minutes now only 3
  421. 18:12minutes and HP IC insert they were
  422. 18:15taking 30 minutes now only 3 minutes so
  423. 18:18this is uh the thing Improvement you can
  424. 18:21see what are the challenges obviously
  425. 18:24culture resistance that is always there
  426. 18:26because whatever the current situation
  427. 18:28is going on we are always happy with
  428. 18:30that if I'll ask you to change your
  429. 18:32mentality even over something the the
  430. 18:36resistance is obvious right what we have
  431. 18:38been doing since last 10 years that
  432. 18:40Legacy we are saying that we usually
  433. 18:43proudly say that last 30 years I'm doing
  434. 18:45this right so even something better is
  435. 18:48coming we try to resist initially that
  436. 18:50is the basic uh nature of the uh any
  437. 18:54this human right but then we are talking
  438. 18:57about human will replaced by the
  439. 18:59machines right right by the robots so
  440. 19:03even if you are changing morning evening
  441. 19:05technology they are not going to resist
  442. 19:06in that way lack of leadership
  443. 19:08commitments because of initial resources
  444. 19:11investment is required so in that way
  445. 19:14your committed leadership is required we
  446. 19:17have this kind of mentality where we we
  447. 19:20have communication barriers we we are
  448. 19:22preventing collaboration we have fear
  449. 19:25what if we will fail what if will not be
  450. 19:27able to recover the initial investment
  451. 19:29cost right and then limited Employee
  452. 19:32Engagement you believe me most of the
  453. 19:34suggestion 90% of the suggestion which
  454. 19:36we are talking about Kaizen small small
  455. 19:38step Improvement come from those people
  456. 19:41who are actually working on the
  457. 19:43production line maybe illiterate people
  458. 19:44or maybe uh it holders they have some
  459. 19:48Proficiency in technological courses
  460. 19:50they have done that the major major
  461. 19:53improvements suggestions are coming from
  462. 19:55them only but if we are not engaging
  463. 19:57them we are not making them comfortable
  464. 20:00that they are part of that organization
  465. 20:02so that input we will not get and you
  466. 20:05visit any organization uh some major
  467. 20:08Improvement skills are coming uh these
  468. 20:11suggestions are coming from the worker
  469. 20:13who is repetitively doing that activity
  470. 20:16for more than 50,000 times in one day
  471. 20:19you just imagine the proficiency or the
  472. 20:21expertise he is having because one
  473. 20:24single piece he is processing if he is
  474. 20:26producing 50,000 units so 50,000 times
  475. 20:31so how we can keep those skills motivate
  476. 20:34them if we are providing them training
  477. 20:36we are uh making them capable of
  478. 20:39thinking we are making them Fearless you
  479. 20:42give us your suggestions whatever if
  480. 20:44Will Fail we'll fail together if we are
  481. 20:46rising we'll rise together right so then
  482. 20:49we'll go for measurement and
  483. 20:51accountability so suggestions maybe
  484. 20:53sometimes we are implementing but then
  485. 20:55we need to track right it can go other
  486. 20:58way around also but yes then we cannot
  487. 21:00stop the uh thinking and we cannot stop
  488. 21:03the continuous improvement process and
  489. 21:05when we are talking about lean
  490. 21:07manufacturing so it is reducing the
  491. 21:09waste obviously we are reducing the
  492. 21:10burden on the people as well working
  493. 21:12with us Planet as well extracting the
  494. 21:15resources from the environment and
  495. 21:17obviously profit will improve because we
  496. 21:19are reducing the cost of producing those
  497. 21:22goods external factors are there as
  498. 21:25challenges because how the external
  499. 21:28environment will change technological
  500. 21:30Position will change will disturb your
  501. 21:32equation political scenario even will
  502. 21:34change will disturb your equation Global
  503. 21:36scenario will change there is war
  504. 21:38between Ukraine and Russia how the crude
  505. 21:40price oils will uh that oil price will
  506. 21:43go up right how you will and if this is
  507. 21:45only the crude oil price and affecting
  508. 21:48almost every industry not only
  509. 21:50Transportation industry because every
  510. 21:52industry is using Transportation
  511. 21:55industry right so in that way how
  512. 21:57resilient you are your supply chain is
  513. 22:00even something is going wrong in the
  514. 22:02external environment how you can tap
  515. 22:05that right or seek the opportunities so
  516. 22:08if I'll compare lean and agile Logistics
  517. 22:11so lean is we are focusing on reducing
  518. 22:14based in that way we want to be
  519. 22:15efficient but in asile we want to be
  520. 22:17flexible if my customer is asking in 10
  521. 22:20minutes delivery I'll send the private
  522. 22:23jet I'll send the uh the best possible
  523. 22:26way the services right so that it should
  524. 22:29be delivered on time if that much valued
  525. 22:31product is right but in lean Logistics
  526. 22:33we'll try to remove the waste but here
  527. 22:36customer satisfaction we are not here
  528. 22:39the constraint is we are not discussing
  529. 22:41about the cost if we are selling BMWs
  530. 22:44Mercedes we are not talking about the
  531. 22:46mileage we are talking about the safety
  532. 22:48features we are talking about Volo we
  533. 22:50are talking about safety we are talking
  534. 22:52about the Comfort right and here we are
  535. 22:55talking about the customer services
  536. 22:57because you not using bulbo right you
  537. 23:00are not using Mercedes so then customer
  538. 23:02services will be compromised somewhere
  539. 23:04right but we are cost efficient right so
  540. 23:07long-term stability obviously but here
  541. 23:10you there is nothing long-term because
  542. 23:12we are working in the dynamic
  543. 23:14environment so you cannot say that this
  544. 23:16is longterm productivity is main target
  545. 23:18but here Target is we are productive we
  546. 23:21are taking the minimum time giving you
  547. 23:23the best services and if you are saying
  548. 23:26that I want BMW I don't care about the
  549. 23:29cost but interior how you will Design I
  550. 23:31want you to implement all my inputs I
  551. 23:34want wooden work I want AC facility here
  552. 23:38there I want this much boot space I want
  553. 23:40that all those things how you want to
  554. 23:42design the interior carpet and all those
  555. 23:45things so that flexibility your
  556. 23:47manufacturer is giving to you when you
  557. 23:49are at you know we are talking about the
  558. 23:52agile Logistics right and then here we
  559. 23:55talk about uniform standardized work but
  560. 23:57here we can canot say that because
  561. 23:59customer is part of your production
  562. 24:01process and he wants to contribute in
  563. 24:03that way that's only agile how agile we
  564. 24:07are and we are providing you say us if
  565. 24:10you want one ice cream will you give you
  566. 24:12one ice cream if you'll ask, ice creams
  567. 24:15we our uh distribution network is
  568. 24:17flexible enough to give you th000 ice
  569. 24:20creams as well right so in that way uh
  570. 24:23we can just compare the lean Logistics
  571. 24:25versus aile Logistics so now this
  572. 24:28beautiful case on Toyota production
  573. 24:30system so based on only lean Logistics
  574. 24:33Concepts although many concepts are
  575. 24:35implemented earlier they were into
  576. 24:37spinning and beeing Industry and then so
  577. 24:40many Concepts came from their very
  578. 24:42beautiful concept is jidoka we'll
  579. 24:43discuss about that and then they are now
  580. 24:46they are known for their automobile uh
  581. 24:48uh contribution whatever they are doing
  582. 24:50and if you'll talk about the founders of
  583. 24:52tot production system taono and
  584. 24:55shigio who contributed l ually in their
  585. 24:59production system in terms of improving
  586. 25:02the quality reducing the resection right
  587. 25:05and they always POS their organization
  588. 25:06has very poor organization who cannot
  589. 25:09afford to produce something like waste
  590. 25:12how seven principles of Toyota
  591. 25:14production system setup time should be
  592. 25:16minimum small lot production right if
  593. 25:19something goes wrong with the lot so
  594. 25:21that that
  595. 25:23only uh lot is spoiled not the if the
  596. 25:26lot size is Big so whole lot will be
  597. 25:29spoiled that is the concept employee
  598. 25:32involvement empowerment so they are
  599. 25:35putting the suggestion box and
  600. 25:36motivating employees giving reward who
  601. 25:39are coming with the you know good
  602. 25:41suggestions right so quality at source
  603. 25:43they are not saying that within
  604. 25:44manufacturing you can maintain the
  605. 25:46quality with your raw material suppliers
  606. 25:49you need to equip your suppliers with
  607. 25:52the
  608. 25:53technology and whatever design
  609. 25:55specification you want you are always
  610. 25:57training your suppliers so that is our
  611. 25:59extended hands that those are very much
  612. 26:02part of if we can cut the cost at the
  613. 26:04initial stage we can cut the cost
  614. 26:06throughout the network equipment
  615. 26:08maintenance how we can ensure the
  616. 26:11predictive maintenance it should not be
  617. 26:13like something goes wrong then your
  618. 26:15maintenance team is working on that how
  619. 26:17we can be uh uh you know uh very very uh
  620. 26:22useful with the predictive maintenance
  621. 26:24before something goes wrong we should
  622. 26:26predict it pull production system let
  623. 26:28the order come then we'll provide the
  624. 26:30order to the customer and supplier
  625. 26:33involvement already we talked about this
  626. 26:36is the complete Toyota production system
  627. 26:39or the quality house you can say where
  628. 26:42the highest quality lowest cost shortest
  629. 26:45lead time by eliminating all the waste
  630. 26:47so these quality cost lead time these
  631. 26:51three focuses and how you can do that by
  632. 26:55eliminating all the waste so what is the
  633. 26:57foundation of this house the foundation
  634. 26:59are these concept hij junka standard B
  635. 27:03total productive maintenance and value
  636. 27:04chain right so and Justus in time these
  637. 27:07are the pillar Justin time and jidoka
  638. 27:09are the pillar and then continuous
  639. 27:12Improvement uh environment they are
  640. 27:14providing within the organization we'll
  641. 27:16go with this uh steps uh these processes
  642. 27:19one by one see
  643. 27:21continuous uh flow of material right how
  644. 27:25you can ensure that how you hij junka is
  645. 27:28is how you are ensuring the evenness we
  646. 27:32talked about unevenness when we talked
  647. 27:34about mura muri mura right so unevenness
  648. 27:37is creating muda or sometimes overburden
  649. 27:40you did not do anything for first two
  650. 27:42days third day you are overb that is
  651. 27:44obvious so that will ensure how smooth
  652. 27:47Supply how many products are required
  653. 27:50those many are shipped from the raw
  654. 27:51material and it is coming to your
  655. 27:53Warehouse these many maybe these are 20
  656. 27:56only 20 items are required 20 components
  657. 27:59we are fixing right so we know how much
  658. 28:02time is required and then in the end we
  659. 28:06we produced 20 products and finally we
  660. 28:09shipped 20 products in the market so
  661. 28:12this is continuous streamline flow we
  662. 28:14are not maintaining extra inventory that
  663. 28:17we can be short of this inventory let us
  664. 28:19maintain this 50 and these are only 20
  665. 28:23right so wooden sticks are only 20 so
  666. 28:26and let's say take iron Hammer 30 or 50
  667. 28:30right so that means that inventory is
  668. 28:32mismatching anyhow without that you
  669. 28:34cannot do that how this is happening you
  670. 28:36are not ensuring make one move one so
  671. 28:39then the extra time you are consuming
  672. 28:41let us take the batch production system
  673. 28:43where we are producing in batches so
  674. 28:45first batch is processed then it will be
  675. 28:48passed it's not that one product is
  676. 28:49produced and will be passed to the next
  677. 28:51stage so you see just one this one
  678. 28:54example this batch process this process
  679. 28:57requires Three Steps step one two and
  680. 29:00three so first step is taking 10 minutes
  681. 29:03so whole batch will be passed to the
  682. 29:05second stage then 10 minutes that mean
  683. 29:0820 minutes then whole batch will be pass
  684. 29:10it's not single item is passed right
  685. 29:13whole batch will be passed to the third
  686. 29:15stage now after first minute of third
  687. 29:18stage my first product will be out that
  688. 29:21means it will take 21 minutes minimum to
  689. 29:24produce the first product right because
  690. 29:2610 minutes here 10 minutes here then the
  691. 29:29complete lot is coming here I'll start
  692. 29:31processing in the very first minute I'll
  693. 29:33produce the first one so 21 minutes but
  694. 29:36if I'll see here first minute 1 minute
  695. 29:39is we are taking on the first stage it
  696. 29:41is moved to the next stage 1 minute is
  697. 29:43taken there move to the next stage and
  698. 29:46on the third stage again 1 minute is
  699. 29:48required so after 3 minutes your first
  700. 29:51product is ready so how we can ensure
  701. 29:54The Continuous Flow processing they
  702. 29:56implemented this scenario in their TOA
  703. 29:59production system just in time they
  704. 30:02implemented just in time and this was
  705. 30:04done by kerio KIRO Toyota in
  706. 30:081937 and uh they said that we are poor
  707. 30:11company we we cannot afford waste right
  708. 30:14so how we can do that uh we need to you
  709. 30:17know collaborate with our uh
  710. 30:18stakeholders raw material suppliers in
  711. 30:20that way so whenever it is required it
  712. 30:22can be shipped to uh our production
  713. 30:25lines so after World War second Mr Tha
  714. 30:28iono so who was uh working in spinning
  715. 30:32and beaing Industry right so there they
  716. 30:34implemented this concept of Justin time
  717. 30:36and jidoka I'll tell you in uh spinning
  718. 30:40industry then he was transferred to uh
  719. 30:43automobile industry to improve the
  720. 30:45quality of the product so in spinning
  721. 30:48industry what was happening let's say
  722. 30:50when in the spinning machine so many
  723. 30:52different threads used to come the
  724. 30:54quality of the clothe you can check how
  725. 30:56many threads are there in each thread
  726. 30:59right so usually uh 24 threads 42 64
  727. 31:03like this 98 threads so many threads are
  728. 31:06there means quality will improve right
  729. 31:08so many threads are coming and in the
  730. 31:10beinging machine spinning machine we are
  731. 31:12coming up with the one piece of cloth
  732. 31:14continuously flowing let's say in
  733. 31:16between one thread is broken so that
  734. 31:20means in the complete uh cloth there
  735. 31:23will be one line because that thread is
  736. 31:25not now captured by the weaving machine
  737. 31:28by the spinning machine
  738. 31:30so this taiu he discovered this concept
  739. 31:34of Joka if something goes wrong at this
  740. 31:37point and thread is broken at the same
  741. 31:40point of time your machine will stop
  742. 31:41working right so this is Joka so this
  743. 31:45piece of cloth maybe 100 m you produced
  744. 31:48right and that piece of thread was
  745. 31:51broken maybe after 20 M so even then you
  746. 31:54kept on producing rest of the 80 M
  747. 31:56clothe which is now way
  748. 31:58so can we do something whenever the
  749. 32:01defect was detected there only your
  750. 32:04machine should stop working that's it
  751. 32:05that is jidoka so they implemented this
  752. 32:08jidoka and later on they try to
  753. 32:10implement this from their baving
  754. 32:11industry to automobile industry PO is
  755. 32:16another concept where uh you you they
  756. 32:19implemented this that even if you want
  757. 32:21to do some mistakes intentionally even
  758. 32:23then you cannot do that uh very good
  759. 32:26example of this can be let's say
  760. 32:28if you are very new with the computer
  761. 32:30I'll give you keyboard mouse CPU UPS
  762. 32:34screen all the accessories pen drive and
  763. 32:36I'll just ask you you put in you plug in
  764. 32:38all the wires required power cables data
  765. 32:40cables and all the so even if you are
  766. 32:42doing very first time even then you
  767. 32:44cannot do the mistake because the Jack
  768. 32:47designed there are designed in that way
  769. 32:50the only that will power cable will go
  770. 32:52into power plug only data cable will go
  771. 32:55into data point only right so the jack
  772. 32:58is designed in that way where
  773. 33:00intentionally you cannot even if you
  774. 33:02want to commit the mistake you cannot do
  775. 33:04that so these two concept jidoka and
  776. 33:06pooke the now uh in the industries
  777. 33:10manufacturing Industries used like
  778. 33:12anything and uh uh your services
  779. 33:15industry also are implementing then
  780. 33:17enden system so this is a kind of
  781. 33:20indication board where you can just
  782. 33:22indicate uh if there is any uh problem
  783. 33:26at any stage let's say stages are there
  784. 33:28on the production line something goes
  785. 33:30wrong on production stage third so there
  786. 33:33will be red light if the problem
  787. 33:35appeared so then the yellow light will
  788. 33:38be there everything is going uh
  789. 33:40perfectly fine green light will be there
  790. 33:42so immediately Our intention will come
  791. 33:44to the end board that if something goes
  792. 33:47wrong whole production system will stop
  793. 33:50this is pooke I was talking about see
  794. 33:52even if you want to fix this here you
  795. 33:55cannot fix because the system design
  796. 33:58design is of that nature so uh you can
  797. 34:01just see I talked about this CPU system
  798. 34:04how you can plug the buyers so that is a
  799. 34:06kind of pooke system this is another
  800. 34:09approach used by Toyota production
  801. 34:11system Gamba first is
  802. 34:14geniusu go and see if there is any
  803. 34:17defect you need to visit that stage and
  804. 34:19then you need to observe that why that
  805. 34:21happened and then you need to ask five
  806. 34:24wise you need to find out the root cause
  807. 34:26that means five wise we asked in fish
  808. 34:29one diagram why that happened we'll go
  809. 34:31to the root cause of that problem and
  810. 34:36then we'll try to discover form of waste
  811. 34:39by identifying mura murri mura
  812. 34:42unevenness overden is there or waste you
  813. 34:45are producing respectful whatever you
  814. 34:47are doing do it as a team and that
  815. 34:50togetherness uh sprad should be there
  816. 34:53and
  817. 34:54Analysis once you are doing collecting
  818. 34:56the data you are collecting data related
  819. 34:59to defect why that happened you should
  820. 35:01include the stakeholders who are working
  821. 35:03on that stage right so that also they
  822. 35:05included in this program this is hij
  823. 35:07junka we talked about how you can smooth
  824. 35:10the production process here you can see
  825. 35:13person one is working on uh assembly
  826. 35:16line and the second person is waiting
  827. 35:18and third is also waiting they are doing
  828. 35:20something here on maybe in one stage how
  829. 35:23you can ensure your production
  830. 35:25streamline you can streamline the whole
  831. 35:27produ prodction so that everyone is
  832. 35:29having something to do that will only
  833. 35:32happen when if the first stage is uh
  834. 35:35requires 5 Seconds your next stage you
  835. 35:38are designing in the production assembly
  836. 35:40uh process that should also take
  837. 35:42somewhere around 5 Seconds right if it
  838. 35:45is taking 7 Seconds 8 seconds so there
  839. 35:47will be semi-finished product inventory
  840. 35:50so he will not be able to process that
  841. 35:53because there will be huge pile of that
  842. 35:55unprocessed product on that St stage
  843. 35:58right so you need to uh streamline the
  844. 36:00process in that way this concept of
  845. 36:02streamlining the process smoothing the
  846. 36:04production is known as hunka which is
  847. 36:06the base of Toyota production system
  848. 36:09Kaizen already I talked about in small
  849. 36:11steps Toyota production system started
  850. 36:14working everybody every day everywhere
  851. 36:16it's not only with the process with the
  852. 36:19equipment as well with the person as
  853. 36:20well you need to improve every day and
  854. 36:23then standardization if you'll do
  855. 36:25standardization Tech time V we calculate
  856. 36:28Tech Time by your production time you
  857. 36:32are having and then the demand from the
  858. 36:35market right so how quickly you are
  859. 36:38producing and meeting the demand that is
  860. 36:40the idea uh you can get by calculating
  861. 36:43the tech time working sequence how
  862. 36:46sequentially I told you in workflow one
  863. 36:48piece one time standard inprocess stock
  864. 36:52that much inventory which is required to
  865. 36:54ensure the minimum T time and work
  866. 36:57sequence can be maintained so it should
  867. 37:00not be like that that for your first
  868. 37:02stage you are waiting for the raw
  869. 37:04material so that should not happen so
  870. 37:06standardization is a critical ingredient
  871. 37:09for jidoka and Justin Time system which
  872. 37:11is quite obvious because if you are
  873. 37:13maintaining that only then you can
  874. 37:14ensure the smooth uh flow of the raw
  875. 37:17material if you see performance so when
  876. 37:21they started somewhere here they started
  877. 37:23implementing Toyota production system
  878. 37:25that house of quality hunka judoka pooke
  879. 37:29where they identified the fault you can
  880. 37:31see with other players the performance
  881. 37:34how they improved right so and this is
  882. 37:37uh you can see 80% increase in per head
  883. 37:41production earlier they were producing
  884. 37:4339.7 vehicles per person now after
  885. 37:47implementing this system in late 80s 7
  886. 37:50near about 71 vehicles per person and if
  887. 37:53you talk about operation income this is
  888. 37:55how they have improved you see and this
  889. 37:57is the era when they implemented Toyota
  890. 37:59production system House of quality right
  891. 38:02and now you see some figures are given
  892. 38:06here earlier this US market Ford and GM
  893. 38:10General Motors they were you know
  894. 38:11capturing the whole market and the this
  895. 38:14is quite obvious that 40% chunk of us
  896. 38:18car and light trucks Market uh GM was
  897. 38:22carrying right but Toyota was carrying
  898. 38:24only 2% but then you see after
  899. 38:26implementing in 80s at this TPS they
  900. 38:30improved 3% then 8% in '90s then 9% in
  901. 38:342000 and then more than 10% in 2006 and
  902. 38:39the share Rose to 13% where GM share
  903. 38:43fell down to 26% so slowly gradually
  904. 38:47steadily this is the Baseline if we'll
  905. 38:50try to you know Define the TOA
  906. 38:51production system so this is how you can
  907. 38:54see small step Improvement led to big
  908. 38:57Improvement in the overall production
  909. 38:59system so this is all about your lean
  910. 39:02Logistics how we can reduce the defects
  911. 39:05how we can uh enhance the efficiency of
  912. 39:08value adding activities by reducing the
  913. 39:10non-v value adding activities so these
  914. 39:12are the references and some textbooks
  915. 39:14you can refer for your detail study so
  916. 39:18thank you very much

About this transcript

This page contains the full transcript of Lecture 17 : Lean Logistics (Contd..) by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 6,295 words across 916 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.