  3. 0:25so hello dear friends welcome back to
  4. 0:27nptl online course on Logistics and
  5. 0:29supply chain management so in the last
  6. 0:31session we started discussion on lean
  7. 0:33Logistics we'll uh continue our uh
  8. 0:36discussion on the same topic lean
  9. 0:38Logistics which is a very very important
  10. 0:41part because uh in order to be efficient
  11. 0:44throughout your distribution Network you
  12. 0:46you need to uh remove identify and
  13. 0:49remove the waste or waste in terms of if
  14. 0:51you are doing some unnecessary
  15. 0:53activities which are not going to add
  16. 0:55any value so then you need to identify
  17. 0:58those activities and uh you need to
  18. 1:00remove those activities so we discussed
  19. 1:02about uh the various Concepts under lean
  20. 1:05Logistics and how it started and we
  21. 1:08discussed about very important concept
  22. 1:10under that we defined muda different
  23. 1:11types of waste unevenness overburden
  24. 1:14right how these situations are coming up
  25. 1:17in when we are talking about
  26. 1:19manufacturing or Logistics Services
  27. 1:21right we discussed about the principles
  28. 1:24of lean Logistics and then we identified
  29. 1:27what are the key performance indicators
  30. 1:29so that we can develop the overall
  31. 1:30performance Matrix and we can track our
  32. 1:33performance with respect to those uh key
  33. 1:36performance indicators so uh we'll
  34. 1:39continue from here uh today we'll
  35. 1:41discuss what are the different
  36. 1:42methodologies framework we can use to
  37. 1:44implement lean Logistics right and then
  38. 1:47we'll see what are the challenges in
  39. 1:50implementing uh lean Logistics and we'll
  40. 1:52discuss one very beautiful case study on
  41. 1:55uh Toyota production system so uh just
  42. 2:00uh brief intro about what are the
  43. 2:02different aspects or methodologies
  44. 2:04framework we can use when we are talking
  45. 2:06about lean Logistics uh we'll discuss in
  46. 2:09brief of some of the methodologies so
  47. 2:12first is value stream mapping uh this
  48. 2:15process is uh actually ENT uh you need
  49. 2:18to trace the whole process you need to
  50. 2:22map the whole process what are the
  51. 2:23different activities you are doing in
  52. 2:25that process right and then you need to
  53. 2:28identify all those activ ities which are
  54. 2:30not adding any value right so after
  55. 2:33identifying only you can eliminate the
  56. 2:36waste and inefficiency because of those
  57. 2:38activities first thing is you are uh
  58. 2:41consuming extra time and then extra time
  59. 2:44means extra resources in terms of
  60. 2:46Manpower is also deployed there in terms
  61. 2:48of resources energy resources you are
  62. 2:50using to operate your machines to
  63. 2:52operate your workstation in terms of
  64. 2:55equipment you are using for extra time
  65. 2:58right so if we can reduce even 2 to 3
  66. 3:01seconds also then this is in in uh Big
  67. 3:06Picture This is going to add in a very
  68. 3:08positive way right so if you talk about
  69. 3:11uh automobile car industry so if the
  70. 3:15average time every car is coming uh out
  71. 3:18maybe after 3 to 3.5 minutes right so
  72. 3:22you just imagine if you're saving uh 2
  73. 3:25to 3 seconds so maybe after uh you are
  74. 3:29producing uh 100 cars then you will be
  75. 3:31having one extra car right so in that
  76. 3:34way because this is something car is
  77. 3:36taking that much time 3 to 4 minutes if
  78. 3:39you are talking about some other product
  79. 3:41Small industry where continuously your
  80. 3:43products are coming out of the packaging
  81. 3:45after completing the packaging right so
  82. 3:47if you can save even micros seconds
  83. 3:50through your process and uh then in the
  84. 3:53end you can uh uh incl uh increase your
  85. 3:56overall efficiency so we'll discuss what
  86. 3:58are the different steps when we are
  87. 4:00talking about value stream mapping in
  88. 4:02detail second tool we can use is just in
  89. 4:05time and because uh we identified
  90. 4:08inventory as one of uh uh type of waste
  91. 4:12right uh when we identified seven
  92. 4:14different types of waste so inventory
  93. 4:16was also one of the waste right so if
  94. 4:18you're keeping no doubt you have to
  95. 4:20maintain some uh minimum Stoke so that
  96. 4:23you should not be sto out in the market
  97. 4:25right but then excess inventory is also
  98. 4:28a kind of waste because in inventory
  99. 4:30when you are storing it you are not
  100. 4:32adding any value in that and moreover
  101. 4:34you are consuming resources on that if
  102. 4:37you're are storing for handling for
  103. 4:39maintaining that inventory and then
  104. 4:42handling also you are damaging sometimes
  105. 4:43so that is extra cost so how we can
  106. 4:46ensure we'll see what are the different
  107. 4:47steps under just in time we can
  108. 4:49Implement that and whenever your product
  109. 4:52is required it can be shipped directly
  110. 4:54from your raw material suppliers to the
  111. 4:55production line and then from production
  112. 4:57to the customer
  113. 4:59then standardized work procedures so
  114. 5:02another thing whenever we are coming up
  115. 5:05in manufacturing industry whenever we
  116. 5:07are setting uh new production line for
  117. 5:09new model right so uh then uh initially
  118. 5:13we are producing uh more process
  119. 5:16rejection right because the process is
  120. 5:18not standardized streamlined right and
  121. 5:21people who are working on that
  122. 5:23production line they are also not
  123. 5:24trained even equipment even sometime
  124. 5:27what is happening the raw material we
  125. 5:28are using the we later on after maybe
  126. 5:32initial run of that production assembly
  127. 5:35line we'll realize that we need to
  128. 5:37change the design we need to change some
  129. 5:39parameters and then we'll come with the
  130. 5:41new one right so because before
  131. 5:43standardization so everything these kind
  132. 5:45of rejections these kind of delays
  133. 5:48inefficiencies are happening so
  134. 5:49productivity is in big question mark
  135. 5:52right so because we cannot be productive
  136. 5:55because we have not achieved the
  137. 5:57standardization so our Target is always
  138. 6:00when we are coming with the new
  139. 6:01production line is to you know
  140. 6:03standardize the production line so if
  141. 6:05we'll standardize we'll eliminate the
  142. 6:07variability because now everything is
  143. 6:09standardized so process variability will
  144. 6:11be very less right so we can reduce
  145. 6:14errors we can improve the efficiency as
  146. 6:17well continuous Improvement culture this
  147. 6:20is another kind of thing we'll see
  148. 6:22Kaizen steps how we can Implement those
  149. 6:25Kaizen steps so that continuous
  150. 6:27Improvement can be ensured it's not only
  151. 6:30one time you uh identified some reasons
  152. 6:33for rejection and then next time the
  153. 6:36process will be completely error free
  154. 6:38right so every day there is new
  155. 6:40opportunity if not with the prod you can
  156. 6:43even improve the product design after
  157. 6:45maybe two years 3 years so that's why so
  158. 6:48many product recalls are happening right
  159. 6:51so you you might have seen we discussed
  160. 6:53about boxagon we discussed about maruti
  161. 6:55with desire and Baleno and then BMW even
  162. 6:59some times and then you talked about uh
  163. 7:02uh if you see uh Nokia they have to
  164. 7:05recall their mobile phone because of the
  165. 7:07uh issues happening with the battery
  166. 7:09right so over the time when uh actually
  167. 7:13after commercialization customers start
  168. 7:16using the product in that way very in
  169. 7:19your rough way right so even rough way
  170. 7:21even if you are handling with care even
  171. 7:23then you will start observing new issues
  172. 7:25are coming so then maybe you need to
  173. 7:27change the raw material maybe you need
  174. 7:29to to change the design of the product
  175. 7:31maybe you need to change the technology
  176. 7:33sometimes for manufacturing that product
  177. 7:35maybe you need to train your Manpower
  178. 7:37more so that means every stakeholder
  179. 7:40every unit element has equal role in
  180. 7:44Improvement right so that continuous
  181. 7:46Improvement will uh be there right
  182. 7:49supplier collaboration when we are
  183. 7:50talking about just in time kind of
  184. 7:52system when we are talking about total
  185. 7:55quality management throughout the
  186. 7:56distribution Network supplier is going
  187. 7:58to play important role right so uh that
  188. 8:01will only happen you will you need to
  189. 8:04share the demand forecast you need to
  190. 8:05share the production schedules because
  191. 8:07your down the line the your team is
  192. 8:10always interacting with the customer
  193. 8:11they are analyzing how the demand
  194. 8:13pattern is going to be right so as a
  195. 8:16manufacturer if you are keeping that
  196. 8:18information with you only or if your
  197. 8:20distribution network is keeping that
  198. 8:22information with them only there is no
  199. 8:24use so how without any delay without any
  200. 8:28uh you know manipulation in that
  201. 8:30information how we can pass the exact
  202. 8:33information from the customer we are
  203. 8:35receiving in terms of feedback in terms
  204. 8:37of quality complaints in terms of demand
  205. 8:39if they are having new demand patterns
  206. 8:41new buying Behavior patterns so that
  207. 8:43should be shared immediately throughout
  208. 8:46the network so that will only happen
  209. 8:48when you have strong collaboration with
  210. 8:50your
  211. 8:51suppliers then another very important
  212. 8:54methodology is dmac for implementing
  213. 8:56lean Six Sigma methodology right where
  214. 8:59we will focus on eliminating the errors
  215. 9:02right rejection so how uh Six Sigma
  216. 9:06actually points out only 3.4 defects are
  217. 9:09allowed per million
  218. 9:12opportunity right so you need to
  219. 9:16implement Six Sigma if you you want to
  220. 9:18implement Six Sigma then the this is the
  221. 9:20methodology dmac we can use to implement
  222. 9:23that and Six Sigma means you are
  223. 9:25tremendously you are reducing the uh
  224. 9:28process re or defects in your product
  225. 9:31whatever you are producing you should
  226. 9:32not produce the defected product so how
  227. 9:35we can implement the Six Sigma
  228. 9:36methodology to you know uh reduce that
  229. 9:40process
  230. 9:41rejection so process rejection uh let me
  231. 9:45clarify uh see there are two types of
  232. 9:47rejection I uh one is your Zero Hour
  233. 9:54rejection another one is your process
  234. 9:57rejection
  235. 10:00so your zero hour reection is the
  236. 10:03responsibility is from the raw material
  237. 10:06suppliers this is the problem with the
  238. 10:08raw material suppliers without you did
  239. 10:10not use that material on the production
  240. 10:12line and then you suddenly realize that
  241. 10:14there is something wrong with that
  242. 10:16material that is zero hour rejection
  243. 10:18there is no issue with your
  244. 10:19manufacturing unit but when we talk
  245. 10:22about process rejection this is
  246. 10:24something while converting those raw
  247. 10:26material into finished one we may break
  248. 10:28those component onon right so that means
  249. 10:30that is the responsibility of the
  250. 10:32manufacturing unit that breakage can
  251. 10:34happen because of the faulty technology
  252. 10:37you are using because of the faulty
  253. 10:39method you are using maybe the person
  254. 10:41who is sitting on that workstation is
  255. 10:43not trained fully so then you will be
  256. 10:46generating more process rejection and
  257. 10:48because this is the responsibility of
  258. 10:50the manufacturer so we will reduce your
  259. 10:52productivity and will increase your cost
  260. 10:56because now uh if you said two items are
  261. 11:01you are using two
  262. 11:03components for that particular product
  263. 11:06two components of one maybe raw material
  264. 11:10so if you are damaging maybe after uh so
  265. 11:13see if you have 100 100 components so 50
  266. 11:16final products should come out of that
  267. 11:18right but if you are damaging those
  268. 11:20products maybe 10 you damaged so then
  269. 11:22you will be producing only 45 finished
  270. 11:24products right so that is the process
  271. 11:26rejection we calculate this process
  272. 11:29rejection as fall of rejection rate fall
  273. 11:32of rejection
  274. 11:34rate and we try to reduce it to less
  275. 11:39than 2% in some organization maybe less
  276. 11:42than 5% 1% so anywhere if you are lying
  277. 11:46between 2 to 3% that means it's fair
  278. 11:48enough but that depends upon your
  279. 11:51industry to industry but now we are into
  280. 11:53the era of uh advanced technology where
  281. 11:56why even 2 to 3% Pro process rejection
  282. 11:59we are allowing that means every 100 AC
  283. 12:03we are manufacturing 2 to three will be
  284. 12:06defected right so you just imagine if
  285. 12:09those defected AC's are shipped to the
  286. 12:12market how the product image will be
  287. 12:15done in the market about your brand
  288. 12:17right the experience customer will carry
  289. 12:19the experience customer will share with
  290. 12:21the other you know customers right so
  291. 12:24that means while your brand image in the
  292. 12:26long run so you need to be careful uh
  293. 12:29with this process rejection so
  294. 12:31technology integration is another tool
  295. 12:33which we can use to you know eliminate
  296. 12:36the waste and Implement lean Logistics
  297. 12:39and uh how we can we have seen that in
  298. 12:41logistics when when you are talking
  299. 12:43about Transportation so in
  300. 12:44transportation how route optimization
  301. 12:46you can do how you can reduce the
  302. 12:49distance how you can pick the better
  303. 12:51route as per the environmental condition
  304. 12:53considering the accidents on the road
  305. 12:55considering the road condition
  306. 12:57considering the traffic jams and then
  307. 12:59your software is giving you the
  308. 13:01instruction that you can take the other
  309. 13:03route it will be faster than the this
  310. 13:05route right so if you can reduce that
  311. 13:07during your transportation again cost
  312. 13:09will come down because you will consume
  313. 13:11less uh your fuel that is one way you
  314. 13:15can use the transportation management
  315. 13:16software the other thing is Warehouse
  316. 13:19dist uh management we talked about how
  317. 13:21within Warehouse you can fully utilize
  318. 13:24the capacity if some part of Warehouse
  319. 13:27is lying bant all the time you can
  320. 13:29collaborate for you can go for
  321. 13:30consolidation horizontal integration
  322. 13:32where you can maybe your competitor's
  323. 13:34product also you can store in your cold
  324. 13:36storage house if that is the requirement
  325. 13:39right then uh how you can ensure by
  326. 13:42implementing those uh software warehouse
  327. 13:45management software you can ensure the
  328. 13:48proper stock rotation if you are
  329. 13:50ensuring that then no inventory will go
  330. 13:53uh outdated or expired right so you can
  331. 13:56in that way ensure the complete
  332. 13:58utilization of the inventry as well so
  333. 14:00these kind of software then handling and
  334. 14:02all that you can maintain quickly
  335. 14:04because it's a big large your Warehouse
  336. 14:07facility how quickly and easily you can
  337. 14:10identify the item and then ship that
  338. 14:12item with your corer partner so that on
  339. 14:14time delivery can happen with the End
  340. 14:16customer so these are some of the
  341. 14:18software we can use and during
  342. 14:20distribution Network also you can see
  343. 14:23how you can consolidate more uh you know
  344. 14:27uh final products or ship so that
  345. 14:30instead of making 10 different
  346. 14:32deliveries can you manage with the two
  347. 14:34uh uh shipments so all those 10
  348. 14:37deliveries uh in that particular pin
  349. 14:39code or reason right so that these kind
  350. 14:41of software will help you to minimize
  351. 14:43the uh your waste and uh obviously the
  352. 14:46performance will be improved sustainable
  353. 14:49packaging practices so obviously uh we
  354. 14:53should Target to recyclable and
  355. 14:55biodegradable uh packaging which should
  356. 14:57have a minimum impact on the the
  357. 14:59environment even whatever packaging you
  358. 15:02decided the material then you know what
  359. 15:04is going to be the footprint whether it
  360. 15:05is recyclable how you are going to
  361. 15:07recollect and all that but there are
  362. 15:09some other parameters which you need to
  363. 15:11take care when you are going for you
  364. 15:13know deciding the packaging right size
  365. 15:15of packaging so we we have seen that
  366. 15:18video when your the container is
  367. 15:20carrying the boxes like this so all size
  368. 15:24of the boxes are not equal and inside
  369. 15:26that boxes box the product is carrying
  370. 15:29only this much space so this much is
  371. 15:31only packaging or maybe extra packaging
  372. 15:34you are adding for just safety measures
  373. 15:36so how we can reduce If the product is
  374. 15:39only up to this how we can reduce this
  375. 15:41extra layer of packaging right so right
  376. 15:44size of packaging will help you to
  377. 15:46reduce the to help uh to utilize the
  378. 15:49complete you know container space right
  379. 15:52and in that way you can be more
  380. 15:54efficient root optimization already we
  381. 15:56talked about you need to see distance
  382. 15:58tra trffic condition delivery time what
  383. 16:01are the requirement from the customer
  384. 16:02and if you can minimize the distance and
  385. 16:04travel obviously the fuel consumption
  386. 16:07will be less vehicle Veer and tier will
  387. 16:10be less so overall Transportation Matrix
  388. 16:13performance Matrix you can
  389. 16:16improve so another your Technology based
  390. 16:19solution where you can go you know
  391. 16:21Performance Based contracts when you are
  392. 16:23going for uh Contracting your Logistics
  393. 16:26things right so you can uh uh go for
  394. 16:29your smart contracts kind of concept or
  395. 16:32uh you can evaluate your vendors
  396. 16:35continuously right whether they are your
  397. 16:38logistic partner career partner are
  398. 16:40doing ontime delivery whether uh orders
  399. 16:43are delivered accurately inventory
  400. 16:45accuracy how much inventory on record
  401. 16:47you have and physically if we'll verify
  402. 16:50so how what is the gap in that so if you
  403. 16:54have completely automated kind of
  404. 16:56Warehouse system so there will be
  405. 16:58absolutely no Gap right so that we can
  406. 17:01uh in that way we can optimize the
  407. 17:03operation and we can minimize the cost
  408. 17:07demand forecast and planning so if you
  409. 17:10are accurately predicting the demand
  410. 17:12using whatever predict analytics you are
  411. 17:14using using software interacting with
  412. 17:17the customers or your sales team
  413. 17:19interacting with the customer so then
  414. 17:21you can go for inventory management and
  415. 17:24you can ensure that over production is
  416. 17:26also not happening and also you are not
  417. 17:29out of stock in the market so whenever
  418. 17:31customer is coming to your retail shop
  419. 17:33or your website you are always in the
  420. 17:36position to deliver the product right so
  421. 17:38this you can predict the demand
  422. 17:40accurately by taking historical data
  423. 17:43market trends and customer feedback but
  424. 17:46sometimes because these are kind of
  425. 17:48historical data you are using and you
  426. 17:49can exate the trend and you can predict
  427. 17:51the future but sometimes some emergency
  428. 17:55situations may happen so because of that
  429. 17:57sometimes demand may come come down
  430. 17:59sometime demand may rise up so if you
  431. 18:02take very uh relevant case of covid-19
  432. 18:05you might have seen the all the
  433. 18:08production houses they uh face
  434. 18:10challenges related to demand because in
  435. 18:13automobile sector as well right so our
  436. 18:15production reduced we shut down the
  437. 18:17operation and all the but if you talk
  438. 18:19about the medical supplies if you talk
  439. 18:21about even the common men started using
  440. 18:24mask gloves face Shields goggles and all
  441. 18:27those things and hand sanitizer right
  442. 18:28right so earlier how frequently we were
  443. 18:31using now almost four five years now
  444. 18:34again you see the condition how
  445. 18:35frequently we are using the hand
  446. 18:36sanitizer gloves and all those things
  447. 18:38right so this this was opportunity for
  448. 18:41those companies but yes was Major
  449. 18:44setback for major part of the economy
  450. 18:47right we can come with the model
  451. 18:49Transportation solution where we can
  452. 18:52standardize the container size uh uh by
  453. 18:56considering the packet size we should
  454. 18:59uh also fix the product packaging size
  455. 19:02so that the 100% container size uh
  456. 19:05capacity can be utilized and we should
  457. 19:07go for Intermodal kind of Transportation
  458. 19:10so that the overall cost can be
  459. 19:12minimized and in that way we can be more
  460. 19:14sustainable wherever we have the
  461. 19:16infrastructure we should go through
  462. 19:18ships right or we can go for last mile
  463. 19:21delivery we can use the Cycles or maybe
  464. 19:24we can use the electrical Vehicles
  465. 19:26reverse Logistics optimization we had a
  466. 19:29complete session on this reverse
  467. 19:31Logistics and then we saw that how
  468. 19:34important this is that if the product is
  469. 19:37coming uh unused product is coming or
  470. 19:39product is coming back because of barant
  471. 19:42failures or product is coming back at
  472. 19:44the end of life so how your uh reverse
  473. 19:47Supply uh chain should be equally uh
  474. 19:50efficient as we are talking about the uh
  475. 19:53forward supply chain so how you can
  476. 19:55efficiently ensure the resale of the
  477. 19:57product if it is unused how you can um
  478. 20:00ensure efficient effective recycling
  479. 20:03refurbishment so all those things will
  480. 20:05ident uh will help you you know to map
  481. 20:08your performance Matrix related to
  482. 20:10reverse Logistics optimization so
  483. 20:14performance measurement and monitoring
  484. 20:16this is important that whatever kpis we
  485. 20:18are recording we need to maintain track
  486. 20:20those kpis throughout our distribution
  487. 20:23Network so only then we can identify
  488. 20:25where are the bottlenecks right where we
  489. 20:27are lacking and like Kaizen I talked
  490. 20:30about so everyday small steps
  491. 20:33Improvement will happen only when we
  492. 20:35will identify where the Improvement
  493. 20:38required at the most where we are
  494. 20:40lacking at the most where we are lacking
  495. 20:43where we are losing our business right
  496. 20:45so how we can be more cost efficient so
  497. 20:48some there may be 100 opportunities but
  498. 20:50if you'll address out of those 100 maybe
  499. 20:53first 10 you will prioritize maybe you
  500. 20:55can address 60 70% of the problem of
  501. 20:58efficiency right so that we need to find
  502. 21:01out so this is the first process value
  503. 21:04stream mapping uh we discussed about how
  504. 21:07we can identify inefficiencies and
  505. 21:09bottlenecks so you need to identify what
  506. 21:11are the value adding activities and what
  507. 21:13are
  508. 21:15the nonv value adding activities non
  509. 21:18value adding activities are also known
  510. 21:20as supporting
  511. 21:24activities and in the end the customer
  512. 21:26is getting one package of product where
  513. 21:30for delivering that product you are
  514. 21:32doing non-v value adding activities as
  515. 21:34well you are doing value adding
  516. 21:35activities as well now value adding
  517. 21:37activities let's say your Logistics is
  518. 21:39value adding activities giving the
  519. 21:41customer best experience by delivering
  520. 21:43the on uh Doorstep Delivery then your
  521. 21:46manufacturing who is putting all those
  522. 21:48feature into that then your sales team
  523. 21:50who is going to address your needs
  524. 21:53record your needs and then provide you
  525. 21:55product as per your requirement right so
  526. 21:57then maybe if you are talking about R&D
  527. 22:00if they are coming with new features
  528. 22:02renovating their product every time
  529. 22:04these are some of the kind of activities
  530. 22:06we from these activities as a customer
  531. 22:09you can continuously you can drive the
  532. 22:10value out of that but non value adding
  533. 22:12activity let's say if you're are talking
  534. 22:14about human resource management so Human
  535. 22:17Resource Management primar function is
  536. 22:19to maintain the human resources within
  537. 22:21the organization and then you are doing
  538. 22:23you are designing your compensation
  539. 22:25policies you are designing your
  540. 22:27Healthcare benefits you you are
  541. 22:28designing all other things related to
  542. 22:31your complete package you are giving to
  543. 22:33your employees now as a customer whether
  544. 22:36you are compensating your employees up
  545. 22:39to the industry level or you are below
  546. 22:43that average or you are above that
  547. 22:44average as a customer if as long as my
  548. 22:47product is okay doing well I need not to
  549. 22:50bother about that so this is kind of but
  550. 22:52this is required I'm not saying that HRM
  551. 22:54practices are not required they are
  552. 22:56doing training and development program
  553. 22:58just to you know keep their Manpower
  554. 23:01resources updated but as a customer I I
  555. 23:05cannot drive Direct Value out of that
  556. 23:07but it is very much required to retain
  557. 23:10your employees within the organization
  558. 23:12right so these kind of uh like if you
  559. 23:14are doing auditing kind of services as a
  560. 23:16customer whether your inventory is
  561. 23:18matching with your physical inventory or
  562. 23:20not how I should B if I'm buying car it
  563. 23:24should have five tires I'm getting five
  564. 23:26tires whether your inventory l cost some
  565. 23:29tires damage some tires hardly bother
  566. 23:31about that as a customer right so you
  567. 23:33need to identify what are value adding
  568. 23:35activities what are non value adding
  569. 23:36activities and how then you can take
  570. 23:39Steps step wise to reduce those non
  571. 23:42value adding activities so this is very
  572. 23:44by W Edwards Deming one of the quality
  573. 23:47Guru so Pioneers in that field he said
  574. 23:50that if you don't describe what you are
  575. 23:52doing as a process that means you don't
  576. 23:55know what you are doing so if your
  577. 23:57process whatever you are doing is not
  578. 23:59related with the end result so that is
  579. 24:01something kind of waste so that is non
  580. 24:04value adding activity so how we can
  581. 24:07eliminate that waste is value stream
  582. 24:09mapping uh this process we'll see five
  583. 24:12steps so simple example you can see
  584. 24:15earlier the motion of the product is
  585. 24:16moving like this jig jaag motion you
  586. 24:18just see how it is moving from here to
  587. 24:21there and then again to zigzag motion is
  588. 24:24there so we identified that extra motion
  589. 24:27means extra handling means breakage of
  590. 24:31the product means extra cost means
  591. 24:35inefficiency so all these things are
  592. 24:39related so how we can reduce it with
  593. 24:41implementing lean Basics and there will
  594. 24:43be the smooth streamline flow so that
  595. 24:47Zig jaag flow should not be there so how
  596. 24:50we can do that we need to prepare the uh
  597. 24:53problem what is the problem we need to
  598. 24:55identify the current state by analyzing
  599. 24:57the current data and then we need to
  600. 24:59develop the future state where we want
  601. 25:01to be and then we'll as per that future
  602. 25:05uh State we will develop the plan and
  603. 25:08we'll try to implement that plan and
  604. 25:10we'll then in the end we'll uh again
  605. 25:12track that plan whether we implemented
  606. 25:15in the same way or uh we will align that
  607. 25:18plan with the overall activity so we'll
  608. 25:20see step by step uh first you'll prepare
  609. 25:24you'll document the change right
  610. 25:26whatever you want to change you'll
  611. 25:28Define the scope either it is related to
  612. 25:31process or you need to change with the
  613. 25:33Manpower or you need to change with
  614. 25:35technology or you need to change
  615. 25:38something else in order to be more
  616. 25:40efficient right so you need to identify
  617. 25:43the scope and then identify the
  618. 25:45requirements if you need to change the
  619. 25:47Manpower so why that requirement is
  620. 25:50there that means Manpower is not train
  621. 25:53fully so you cannot hire and fire just
  622. 25:56like that so what you can do you you can
  623. 25:58arrange the training and development
  624. 26:00programs for those people who are
  625. 26:02working on those critical stages so this
  626. 26:05is how it will happen so then you need
  627. 26:08to set logistics for event uh you need
  628. 26:11participants stakeholders if you are
  629. 26:13talking about process the process
  630. 26:15stakeholders will be there location
  631. 26:17where you are going to implement
  632. 26:18materials refreshment meals everything
  633. 26:20is required to you know this is a kind
  634. 26:23of Workshop you are going to conduct
  635. 26:25initial basis and then you will analyze
  636. 26:27the result of of that then you need to
  637. 26:30gather data let's say right now the
  638. 26:32problem you identified related to ontime
  639. 26:34delivery now this ontime delivery is not
  640. 26:37happening because
  641. 26:40because the career
  642. 26:43partner did not pick the product on
  643. 26:48time so that means now I need not to
  644. 26:51focus just on the distribution partner I
  645. 26:54need to focus on first on the that
  646. 26:58partner who was taking the product from
  647. 27:01the
  648. 27:02seller that career
  649. 27:05partner and
  650. 27:08shipping to the local Warehouse right
  651. 27:12and then from there it is going to
  652. 27:14customer right so this problem is with
  653. 27:17the this career partner he did not pick
  654. 27:19on time so then the problem uh came from
  655. 27:24there only so even if this corer partner
  656. 27:27is on time but because the initial delay
  657. 27:29happened so that will giving you will be
  658. 27:32giving you reple effect right so it will
  659. 27:34be uh you know effect uh it will affect
  660. 27:38your the whole process so you need to
  661. 27:41identify if you're talking about actual
  662. 27:43lead time what is the lead time output
  663. 27:45related issues are there cycle time you
  664. 27:48are not able to complete on time so
  665. 27:50whether you need to rethink about the
  666. 27:52cycle time or you need to uh reduce the
  667. 27:55unnecessary activities then defect rate
  668. 27:57quality related issues are there so that
  669. 27:59means you need to identify that thing
  670. 28:02and you need to analyze the collect the
  671. 28:04data right if I'm saying that map the
  672. 28:07flow of item and delivery ontime
  673. 28:10delivery was one big question so we
  674. 28:12mapped this flow of item so product
  675. 28:15started the journey from the seller
  676. 28:17right actually started the journey from
  677. 28:19the raw material supplier and then corer
  678. 28:21partner then again shipping agent is
  679. 28:23there then local warehouse distribution
  680. 28:25partner will be there who will be giving
  681. 28:27the uh final product so we need to find
  682. 28:30out the flow of the information and in
  683. 28:32that flow where the bottleneck is there
  684. 28:36right we need to identify that we need
  685. 28:38to then find out the future State okay
  686. 28:41future State and action plan now we
  687. 28:43identified that uh if we are saying 5
  688. 28:47days it will take so uh it will give you
  689. 28:51only 12 hours to the corer partner to
  690. 28:54pick the product from the seller right
  691. 28:56so if it is taking more than 20 hours
  692. 29:00you need to identify that this is the
  693. 29:02target this is the gap so you need to
  694. 29:03identify this as future state that we
  695. 29:05need to Target 12 hours that is maximum
  696. 29:08we can go for and then we will
  697. 29:10communicate this with the career partner
  698. 29:12that you need to pick after recording
  699. 29:14the order within 12 hours you need to
  700. 29:16pick the product right and if it is not
  701. 29:18happening maybe you need to change the
  702. 29:20technology because you are not able to
  703. 29:22share information quickly so then you
  704. 29:23need to do and then maybe sometimes
  705. 29:25training is required so let's say we'll
  706. 29:28explore this uh uh one worksheet uh the
  707. 29:32process or function let's say we are
  708. 29:34shipping the wrong
  709. 29:36product and why this happened Oris
  710. 29:39problem uh maybe the person who was
  711. 29:42sitting on that recorded wrong order
  712. 29:47wrong
  713. 29:47order recorded right now action items
  714. 29:51what we will do why the wrong order
  715. 29:53recorded I as a j customer I place the
  716. 29:56order with the restaurant and maybe
  717. 29:59restaurant uh that information was not
  718. 30:01shared accurately and in the end when I
  719. 30:04communicated with my kitchen so I
  720. 30:07communicated wrong items right so now
  721. 30:11lack is because human intervention is
  722. 30:15there why uh is it possible can be
  723. 30:19replac this if the order is directly
  724. 30:22coming to Jato can we share the exact
  725. 30:24information with the kitchen uh as uh
  726. 30:27through that Network so that this wrong
  727. 30:29shipment of item will not happen so
  728. 30:32we'll share that this who is responsible
  729. 30:34for this the technology people R&D
  730. 30:37people who can develop this platform
  731. 30:38right due date how we can Implement that
  732. 30:41and then we we'll record the matrices
  733. 30:43how we can uh improve those uh
  734. 30:46performances right and then in the end
  735. 30:48once we decided that this technology
  736. 30:51will be implemented so that we can
  737. 30:52ensure the uh delivery of the right
  738. 30:55product we need to execute the plan
  739. 30:58right and then once executed we need to
  740. 31:01align this and maybe many reviews may be
  741. 31:05required with respect to what you have
  742. 31:07been doing earlier right and then
  743. 31:09implementation and results whether that
  744. 31:12really affecting your performance Matrix
  745. 31:14or not that you need to record right so
  746. 31:18if the investment is this much right
  747. 31:21investment is this much and your result
  748. 31:23is this much you need to rethink about
  749. 31:26that because you contributed so much but
  750. 31:28the result is so maybe then you are
  751. 31:30addressing the wrong issue so then uh
  752. 31:33one you again you will review you will
  753. 31:35review in the with respect to the
  754. 31:37environmental changes right and then you
  755. 31:39will communicate the results whatever
  756. 31:41changes are required you will update
  757. 31:43those changes with the your technical
  758. 31:45team and in the end you will ensure that
  759. 31:47that wrong delivery should not happen a
  760. 31:50very simple example how we can implement
  761. 31:52this right so if you see I want to
  762. 31:55steple a paper and the complete process
  763. 31:58is given here I'll pick up the paper 1
  764. 32:02second I will take walk to steppler 5
  765. 32:04second I will take steple 2 seconds walk
  766. 32:07to desk again 5 Seconds put down the
  767. 32:10paper 1 second so total time if you will
  768. 32:13add is 6 8 13 14 right and if you'll see
  769. 32:19total distance you traveled is 140 40 ft
  770. 32:23but value added time is only you picked
  771. 32:26up the paper you stle the paper and you
  772. 32:29put down the paper that is only 4
  773. 32:31seconds so those 10 seconds are waste
  774. 32:36and value added distance no distance was
  775. 32:39required if your paper and Pen uh your
  776. 32:42steppler is there only this is very
  777. 32:43simple example so that distance also you
  778. 32:46can minimize right so you can see how
  779. 32:49you can be productive value added time
  780. 32:51was only
  781. 32:5228% so rest whatever you were doing was
  782. 32:55waste right so 72 2% of the things you
  783. 32:58are doing is waste right so uh we'll
  784. 33:02continue this discussion with the uh
  785. 33:05some uh more methodologies how we can
  786. 33:07implement the lean Logistics and
  787. 33:09obviously we'll go for one case so uh
  788. 33:12this is the reference list from where
  789. 33:14the content has been prepared and you
  790. 33:15can refer uh these books for more
  791. 33:18understanding better understanding of
  792. 33:19this right so uh that's all from this
  793. 33:22session we'll continue discussion on
  794. 33:24different methodologies in lean
  795. 33:26Logistics while you plan to implement
  796. 33:29lean Logistics in your operational area
  797. 33:31right and we'll go for uh uh Toyota
  798. 33:34production system as case study so thank
  799. 33:36you very much

About this transcript

This page contains the full transcript of Lecture 16 : Lean Logistics (Contd..) by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 5,385 words across 799 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.