- 0:25so hello dear friends welcome back to
- 0:27nptl online course on Logistics and
- 0:29supply chain management so in the last
- 0:31session we started discussion on lean
- 0:33Logistics we'll uh continue our uh
- 0:36discussion on the same topic lean
- 0:38Logistics which is a very very important
- 0:41part because uh in order to be efficient
- 0:44throughout your distribution Network you
- 0:46you need to uh remove identify and
- 0:49remove the waste or waste in terms of if
- 0:51you are doing some unnecessary
- 0:53activities which are not going to add
- 0:55any value so then you need to identify
- 0:58those activities and uh you need to
- 1:00remove those activities so we discussed
- 1:02about uh the various Concepts under lean
- 1:05Logistics and how it started and we
- 1:08discussed about very important concept
- 1:10under that we defined muda different
- 1:11types of waste unevenness overburden
- 1:14right how these situations are coming up
- 1:17in when we are talking about
- 1:19manufacturing or Logistics Services
- 1:21right we discussed about the principles
- 1:24of lean Logistics and then we identified
- 1:27what are the key performance indicators
- 1:29so that we can develop the overall
- 1:30performance Matrix and we can track our
- 1:33performance with respect to those uh key
- 1:36performance indicators so uh we'll
- 1:39continue from here uh today we'll
- 1:41discuss what are the different
- 1:42methodologies framework we can use to
- 1:44implement lean Logistics right and then
- 1:47we'll see what are the challenges in
- 1:50implementing uh lean Logistics and we'll
- 1:52discuss one very beautiful case study on
- 1:55uh Toyota production system so uh just
- 2:00uh brief intro about what are the
- 2:02different aspects or methodologies
- 2:04framework we can use when we are talking
- 2:06about lean Logistics uh we'll discuss in
- 2:09brief of some of the methodologies so
- 2:12first is value stream mapping uh this
- 2:15process is uh actually ENT uh you need
- 2:18to trace the whole process you need to
- 2:22map the whole process what are the
- 2:23different activities you are doing in
- 2:25that process right and then you need to
- 2:28identify all those activ ities which are
- 2:30not adding any value right so after
- 2:33identifying only you can eliminate the
- 2:36waste and inefficiency because of those
- 2:38activities first thing is you are uh
- 2:41consuming extra time and then extra time
- 2:44means extra resources in terms of
- 2:46Manpower is also deployed there in terms
- 2:48of resources energy resources you are
- 2:50using to operate your machines to
- 2:52operate your workstation in terms of
- 2:55equipment you are using for extra time
- 2:58right so if we can reduce even 2 to 3
- 3:01seconds also then this is in in uh Big
- 3:06Picture This is going to add in a very
- 3:08positive way right so if you talk about
- 3:11uh automobile car industry so if the
- 3:15average time every car is coming uh out
- 3:18maybe after 3 to 3.5 minutes right so
- 3:22you just imagine if you're saving uh 2
- 3:25to 3 seconds so maybe after uh you are
- 3:29producing uh 100 cars then you will be
- 3:31having one extra car right so in that
- 3:34way because this is something car is
- 3:36taking that much time 3 to 4 minutes if
- 3:39you are talking about some other product
- 3:41Small industry where continuously your
- 3:43products are coming out of the packaging
- 3:45after completing the packaging right so
- 3:47if you can save even micros seconds
- 3:50through your process and uh then in the
- 3:53end you can uh uh incl uh increase your
- 3:56overall efficiency so we'll discuss what
- 3:58are the different steps when we are
- 4:00talking about value stream mapping in
- 4:02detail second tool we can use is just in
- 4:05time and because uh we identified
- 4:08inventory as one of uh uh type of waste
- 4:12right uh when we identified seven
- 4:14different types of waste so inventory
- 4:16was also one of the waste right so if
- 4:18you're keeping no doubt you have to
- 4:20maintain some uh minimum Stoke so that
- 4:23you should not be sto out in the market
- 4:25right but then excess inventory is also
- 4:28a kind of waste because in inventory
- 4:30when you are storing it you are not
- 4:32adding any value in that and moreover
- 4:34you are consuming resources on that if
- 4:37you're are storing for handling for
- 4:39maintaining that inventory and then
- 4:42handling also you are damaging sometimes
- 4:43so that is extra cost so how we can
- 4:46ensure we'll see what are the different
- 4:47steps under just in time we can
- 4:49Implement that and whenever your product
- 4:52is required it can be shipped directly
- 4:54from your raw material suppliers to the
- 4:55production line and then from production
- 4:57to the customer
- 4:59then standardized work procedures so
- 5:02another thing whenever we are coming up
- 5:05in manufacturing industry whenever we
- 5:07are setting uh new production line for
- 5:09new model right so uh then uh initially
- 5:13we are producing uh more process
- 5:16rejection right because the process is
- 5:18not standardized streamlined right and
- 5:21people who are working on that
- 5:23production line they are also not
- 5:24trained even equipment even sometime
- 5:27what is happening the raw material we
- 5:28are using the we later on after maybe
- 5:32initial run of that production assembly
- 5:35line we'll realize that we need to
- 5:37change the design we need to change some
- 5:39parameters and then we'll come with the
- 5:41new one right so because before
- 5:43standardization so everything these kind
- 5:45of rejections these kind of delays
- 5:48inefficiencies are happening so
- 5:49productivity is in big question mark
- 5:52right so because we cannot be productive
- 5:55because we have not achieved the
- 5:57standardization so our Target is always
- 6:00when we are coming with the new
- 6:01production line is to you know
- 6:03standardize the production line so if
- 6:05we'll standardize we'll eliminate the
- 6:07variability because now everything is
- 6:09standardized so process variability will
- 6:11be very less right so we can reduce
- 6:14errors we can improve the efficiency as
- 6:17well continuous Improvement culture this
- 6:20is another kind of thing we'll see
- 6:22Kaizen steps how we can Implement those
- 6:25Kaizen steps so that continuous
- 6:27Improvement can be ensured it's not only
- 6:30one time you uh identified some reasons
- 6:33for rejection and then next time the
- 6:36process will be completely error free
- 6:38right so every day there is new
- 6:40opportunity if not with the prod you can
- 6:43even improve the product design after
- 6:45maybe two years 3 years so that's why so
- 6:48many product recalls are happening right
- 6:51so you you might have seen we discussed
- 6:53about boxagon we discussed about maruti
- 6:55with desire and Baleno and then BMW even
- 6:59some times and then you talked about uh
- 7:02uh if you see uh Nokia they have to
- 7:05recall their mobile phone because of the
- 7:07uh issues happening with the battery
- 7:09right so over the time when uh actually
- 7:13after commercialization customers start
- 7:16using the product in that way very in
- 7:19your rough way right so even rough way
- 7:21even if you are handling with care even
- 7:23then you will start observing new issues
- 7:25are coming so then maybe you need to
- 7:27change the raw material maybe you need
- 7:29to to change the design of the product
- 7:31maybe you need to change the technology
- 7:33sometimes for manufacturing that product
- 7:35maybe you need to train your Manpower
- 7:37more so that means every stakeholder
- 7:40every unit element has equal role in
- 7:44Improvement right so that continuous
- 7:46Improvement will uh be there right
- 7:49supplier collaboration when we are
- 7:50talking about just in time kind of
- 7:52system when we are talking about total
- 7:55quality management throughout the
- 7:56distribution Network supplier is going
- 7:58to play important role right so uh that
- 8:01will only happen you will you need to
- 8:04share the demand forecast you need to
- 8:05share the production schedules because
- 8:07your down the line the your team is
- 8:10always interacting with the customer
- 8:11they are analyzing how the demand
- 8:13pattern is going to be right so as a
- 8:16manufacturer if you are keeping that
- 8:18information with you only or if your
- 8:20distribution network is keeping that
- 8:22information with them only there is no
- 8:24use so how without any delay without any
- 8:28uh you know manipulation in that
- 8:30information how we can pass the exact
- 8:33information from the customer we are
- 8:35receiving in terms of feedback in terms
- 8:37of quality complaints in terms of demand
- 8:39if they are having new demand patterns
- 8:41new buying Behavior patterns so that
- 8:43should be shared immediately throughout
- 8:46the network so that will only happen
- 8:48when you have strong collaboration with
- 8:50your
- 8:51suppliers then another very important
- 8:54methodology is dmac for implementing
- 8:56lean Six Sigma methodology right where
- 8:59we will focus on eliminating the errors
- 9:02right rejection so how uh Six Sigma
- 9:06actually points out only 3.4 defects are
- 9:09allowed per million
- 9:12opportunity right so you need to
- 9:16implement Six Sigma if you you want to
- 9:18implement Six Sigma then the this is the
- 9:20methodology dmac we can use to implement
- 9:23that and Six Sigma means you are
- 9:25tremendously you are reducing the uh
- 9:28process re or defects in your product
- 9:31whatever you are producing you should
- 9:32not produce the defected product so how
- 9:35we can implement the Six Sigma
- 9:36methodology to you know uh reduce that
- 9:40process
- 9:41rejection so process rejection uh let me
- 9:45clarify uh see there are two types of
- 9:47rejection I uh one is your Zero Hour
- 9:54rejection another one is your process
- 9:57rejection
- 10:00so your zero hour reection is the
- 10:03responsibility is from the raw material
- 10:06suppliers this is the problem with the
- 10:08raw material suppliers without you did
- 10:10not use that material on the production
- 10:12line and then you suddenly realize that
- 10:14there is something wrong with that
- 10:16material that is zero hour rejection
- 10:18there is no issue with your
- 10:19manufacturing unit but when we talk
- 10:22about process rejection this is
- 10:24something while converting those raw
- 10:26material into finished one we may break
- 10:28those component onon right so that means
- 10:30that is the responsibility of the
- 10:32manufacturing unit that breakage can
- 10:34happen because of the faulty technology
- 10:37you are using because of the faulty
- 10:39method you are using maybe the person
- 10:41who is sitting on that workstation is
- 10:43not trained fully so then you will be
- 10:46generating more process rejection and
- 10:48because this is the responsibility of
- 10:50the manufacturer so we will reduce your
- 10:52productivity and will increase your cost
- 10:56because now uh if you said two items are
- 11:01you are using two
- 11:03components for that particular product
- 11:06two components of one maybe raw material
- 11:10so if you are damaging maybe after uh so
- 11:13see if you have 100 100 components so 50
- 11:16final products should come out of that
- 11:18right but if you are damaging those
- 11:20products maybe 10 you damaged so then
- 11:22you will be producing only 45 finished
- 11:24products right so that is the process
- 11:26rejection we calculate this process
- 11:29rejection as fall of rejection rate fall
- 11:32of rejection
- 11:34rate and we try to reduce it to less
- 11:39than 2% in some organization maybe less
- 11:42than 5% 1% so anywhere if you are lying
- 11:46between 2 to 3% that means it's fair
- 11:48enough but that depends upon your
- 11:51industry to industry but now we are into
- 11:53the era of uh advanced technology where
- 11:56why even 2 to 3% Pro process rejection
- 11:59we are allowing that means every 100 AC
- 12:03we are manufacturing 2 to three will be
- 12:06defected right so you just imagine if
- 12:09those defected AC's are shipped to the
- 12:12market how the product image will be
- 12:15done in the market about your brand
- 12:17right the experience customer will carry
- 12:19the experience customer will share with
- 12:21the other you know customers right so
- 12:24that means while your brand image in the
- 12:26long run so you need to be careful uh
- 12:29with this process rejection so
- 12:31technology integration is another tool
- 12:33which we can use to you know eliminate
- 12:36the waste and Implement lean Logistics
- 12:39and uh how we can we have seen that in
- 12:41logistics when when you are talking
- 12:43about Transportation so in
- 12:44transportation how route optimization
- 12:46you can do how you can reduce the
- 12:49distance how you can pick the better
- 12:51route as per the environmental condition
- 12:53considering the accidents on the road
- 12:55considering the road condition
- 12:57considering the traffic jams and then
- 12:59your software is giving you the
- 13:01instruction that you can take the other
- 13:03route it will be faster than the this
- 13:05route right so if you can reduce that
- 13:07during your transportation again cost
- 13:09will come down because you will consume
- 13:11less uh your fuel that is one way you
- 13:15can use the transportation management
- 13:16software the other thing is Warehouse
- 13:19dist uh management we talked about how
- 13:21within Warehouse you can fully utilize
- 13:24the capacity if some part of Warehouse
- 13:27is lying bant all the time you can
- 13:29collaborate for you can go for
- 13:30consolidation horizontal integration
- 13:32where you can maybe your competitor's
- 13:34product also you can store in your cold
- 13:36storage house if that is the requirement
- 13:39right then uh how you can ensure by
- 13:42implementing those uh software warehouse
- 13:45management software you can ensure the
- 13:48proper stock rotation if you are
- 13:50ensuring that then no inventory will go
- 13:53uh outdated or expired right so you can
- 13:56in that way ensure the complete
- 13:58utilization of the inventry as well so
- 14:00these kind of software then handling and
- 14:02all that you can maintain quickly
- 14:04because it's a big large your Warehouse
- 14:07facility how quickly and easily you can
- 14:10identify the item and then ship that
- 14:12item with your corer partner so that on
- 14:14time delivery can happen with the End
- 14:16customer so these are some of the
- 14:18software we can use and during
- 14:20distribution Network also you can see
- 14:23how you can consolidate more uh you know
- 14:27uh final products or ship so that
- 14:30instead of making 10 different
- 14:32deliveries can you manage with the two
- 14:34uh uh shipments so all those 10
- 14:37deliveries uh in that particular pin
- 14:39code or reason right so that these kind
- 14:41of software will help you to minimize
- 14:43the uh your waste and uh obviously the
- 14:46performance will be improved sustainable
- 14:49packaging practices so obviously uh we
- 14:53should Target to recyclable and
- 14:55biodegradable uh packaging which should
- 14:57have a minimum impact on the the
- 14:59environment even whatever packaging you
- 15:02decided the material then you know what
- 15:04is going to be the footprint whether it
- 15:05is recyclable how you are going to
- 15:07recollect and all that but there are
- 15:09some other parameters which you need to
- 15:11take care when you are going for you
- 15:13know deciding the packaging right size
- 15:15of packaging so we we have seen that
- 15:18video when your the container is
- 15:20carrying the boxes like this so all size
- 15:24of the boxes are not equal and inside
- 15:26that boxes box the product is carrying
- 15:29only this much space so this much is
- 15:31only packaging or maybe extra packaging
- 15:34you are adding for just safety measures
- 15:36so how we can reduce If the product is
- 15:39only up to this how we can reduce this
- 15:41extra layer of packaging right so right
- 15:44size of packaging will help you to
- 15:46reduce the to help uh to utilize the
- 15:49complete you know container space right
- 15:52and in that way you can be more
- 15:54efficient root optimization already we
- 15:56talked about you need to see distance
- 15:58tra trffic condition delivery time what
- 16:01are the requirement from the customer
- 16:02and if you can minimize the distance and
- 16:04travel obviously the fuel consumption
- 16:07will be less vehicle Veer and tier will
- 16:10be less so overall Transportation Matrix
- 16:13performance Matrix you can
- 16:16improve so another your Technology based
- 16:19solution where you can go you know
- 16:21Performance Based contracts when you are
- 16:23going for uh Contracting your Logistics
- 16:26things right so you can uh uh go for
- 16:29your smart contracts kind of concept or
- 16:32uh you can evaluate your vendors
- 16:35continuously right whether they are your
- 16:38logistic partner career partner are
- 16:40doing ontime delivery whether uh orders
- 16:43are delivered accurately inventory
- 16:45accuracy how much inventory on record
- 16:47you have and physically if we'll verify
- 16:50so how what is the gap in that so if you
- 16:54have completely automated kind of
- 16:56Warehouse system so there will be
- 16:58absolutely no Gap right so that we can
- 17:01uh in that way we can optimize the
- 17:03operation and we can minimize the cost
- 17:07demand forecast and planning so if you
- 17:10are accurately predicting the demand
- 17:12using whatever predict analytics you are
- 17:14using using software interacting with
- 17:17the customers or your sales team
- 17:19interacting with the customer so then
- 17:21you can go for inventory management and
- 17:24you can ensure that over production is
- 17:26also not happening and also you are not
- 17:29out of stock in the market so whenever
- 17:31customer is coming to your retail shop
- 17:33or your website you are always in the
- 17:36position to deliver the product right so
- 17:38this you can predict the demand
- 17:40accurately by taking historical data
- 17:43market trends and customer feedback but
- 17:46sometimes because these are kind of
- 17:48historical data you are using and you
- 17:49can exate the trend and you can predict
- 17:51the future but sometimes some emergency
- 17:55situations may happen so because of that
- 17:57sometimes demand may come come down
- 17:59sometime demand may rise up so if you
- 18:02take very uh relevant case of covid-19
- 18:05you might have seen the all the
- 18:08production houses they uh face
- 18:10challenges related to demand because in
- 18:13automobile sector as well right so our
- 18:15production reduced we shut down the
- 18:17operation and all the but if you talk
- 18:19about the medical supplies if you talk
- 18:21about even the common men started using
- 18:24mask gloves face Shields goggles and all
- 18:27those things and hand sanitizer right
- 18:28right so earlier how frequently we were
- 18:31using now almost four five years now
- 18:34again you see the condition how
- 18:35frequently we are using the hand
- 18:36sanitizer gloves and all those things
- 18:38right so this this was opportunity for
- 18:41those companies but yes was Major
- 18:44setback for major part of the economy
- 18:47right we can come with the model
- 18:49Transportation solution where we can
- 18:52standardize the container size uh uh by
- 18:56considering the packet size we should
- 18:59uh also fix the product packaging size
- 19:02so that the 100% container size uh
- 19:05capacity can be utilized and we should
- 19:07go for Intermodal kind of Transportation
- 19:10so that the overall cost can be
- 19:12minimized and in that way we can be more
- 19:14sustainable wherever we have the
- 19:16infrastructure we should go through
- 19:18ships right or we can go for last mile
- 19:21delivery we can use the Cycles or maybe
- 19:24we can use the electrical Vehicles
- 19:26reverse Logistics optimization we had a
- 19:29complete session on this reverse
- 19:31Logistics and then we saw that how
- 19:34important this is that if the product is
- 19:37coming uh unused product is coming or
- 19:39product is coming back because of barant
- 19:42failures or product is coming back at
- 19:44the end of life so how your uh reverse
- 19:47Supply uh chain should be equally uh
- 19:50efficient as we are talking about the uh
- 19:53forward supply chain so how you can
- 19:55efficiently ensure the resale of the
- 19:57product if it is unused how you can um
- 20:00ensure efficient effective recycling
- 20:03refurbishment so all those things will
- 20:05ident uh will help you you know to map
- 20:08your performance Matrix related to
- 20:10reverse Logistics optimization so
- 20:14performance measurement and monitoring
- 20:16this is important that whatever kpis we
- 20:18are recording we need to maintain track
- 20:20those kpis throughout our distribution
- 20:23Network so only then we can identify
- 20:25where are the bottlenecks right where we
- 20:27are lacking and like Kaizen I talked
- 20:30about so everyday small steps
- 20:33Improvement will happen only when we
- 20:35will identify where the Improvement
- 20:38required at the most where we are
- 20:40lacking at the most where we are lacking
- 20:43where we are losing our business right
- 20:45so how we can be more cost efficient so
- 20:48some there may be 100 opportunities but
- 20:50if you'll address out of those 100 maybe
- 20:53first 10 you will prioritize maybe you
- 20:55can address 60 70% of the problem of
- 20:58efficiency right so that we need to find
- 21:01out so this is the first process value
- 21:04stream mapping uh we discussed about how
- 21:07we can identify inefficiencies and
- 21:09bottlenecks so you need to identify what
- 21:11are the value adding activities and what
- 21:13are
- 21:15the nonv value adding activities non
- 21:18value adding activities are also known
- 21:20as supporting
- 21:24activities and in the end the customer
- 21:26is getting one package of product where
- 21:30for delivering that product you are
- 21:32doing non-v value adding activities as
- 21:34well you are doing value adding
- 21:35activities as well now value adding
- 21:37activities let's say your Logistics is
- 21:39value adding activities giving the
- 21:41customer best experience by delivering
- 21:43the on uh Doorstep Delivery then your
- 21:46manufacturing who is putting all those
- 21:48feature into that then your sales team
- 21:50who is going to address your needs
- 21:53record your needs and then provide you
- 21:55product as per your requirement right so
- 21:57then maybe if you are talking about R&D
- 22:00if they are coming with new features
- 22:02renovating their product every time
- 22:04these are some of the kind of activities
- 22:06we from these activities as a customer
- 22:09you can continuously you can drive the
- 22:10value out of that but non value adding
- 22:12activity let's say if you're are talking
- 22:14about human resource management so Human
- 22:17Resource Management primar function is
- 22:19to maintain the human resources within
- 22:21the organization and then you are doing
- 22:23you are designing your compensation
- 22:25policies you are designing your
- 22:27Healthcare benefits you you are
- 22:28designing all other things related to
- 22:31your complete package you are giving to
- 22:33your employees now as a customer whether
- 22:36you are compensating your employees up
- 22:39to the industry level or you are below
- 22:43that average or you are above that
- 22:44average as a customer if as long as my
- 22:47product is okay doing well I need not to
- 22:50bother about that so this is kind of but
- 22:52this is required I'm not saying that HRM
- 22:54practices are not required they are
- 22:56doing training and development program
- 22:58just to you know keep their Manpower
- 23:01resources updated but as a customer I I
- 23:05cannot drive Direct Value out of that
- 23:07but it is very much required to retain
- 23:10your employees within the organization
- 23:12right so these kind of uh like if you
- 23:14are doing auditing kind of services as a
- 23:16customer whether your inventory is
- 23:18matching with your physical inventory or
- 23:20not how I should B if I'm buying car it
- 23:24should have five tires I'm getting five
- 23:26tires whether your inventory l cost some
- 23:29tires damage some tires hardly bother
- 23:31about that as a customer right so you
- 23:33need to identify what are value adding
- 23:35activities what are non value adding
- 23:36activities and how then you can take
- 23:39Steps step wise to reduce those non
- 23:42value adding activities so this is very
- 23:44by W Edwards Deming one of the quality
- 23:47Guru so Pioneers in that field he said
- 23:50that if you don't describe what you are
- 23:52doing as a process that means you don't
- 23:55know what you are doing so if your
- 23:57process whatever you are doing is not
- 23:59related with the end result so that is
- 24:01something kind of waste so that is non
- 24:04value adding activity so how we can
- 24:07eliminate that waste is value stream
- 24:09mapping uh this process we'll see five
- 24:12steps so simple example you can see
- 24:15earlier the motion of the product is
- 24:16moving like this jig jaag motion you
- 24:18just see how it is moving from here to
- 24:21there and then again to zigzag motion is
- 24:24there so we identified that extra motion
- 24:27means extra handling means breakage of
- 24:31the product means extra cost means
- 24:35inefficiency so all these things are
- 24:39related so how we can reduce it with
- 24:41implementing lean Basics and there will
- 24:43be the smooth streamline flow so that
- 24:47Zig jaag flow should not be there so how
- 24:50we can do that we need to prepare the uh
- 24:53problem what is the problem we need to
- 24:55identify the current state by analyzing
- 24:57the current data and then we need to
- 24:59develop the future state where we want
- 25:01to be and then we'll as per that future
- 25:05uh State we will develop the plan and
- 25:08we'll try to implement that plan and
- 25:10we'll then in the end we'll uh again
- 25:12track that plan whether we implemented
- 25:15in the same way or uh we will align that
- 25:18plan with the overall activity so we'll
- 25:20see step by step uh first you'll prepare
- 25:24you'll document the change right
- 25:26whatever you want to change you'll
- 25:28Define the scope either it is related to
- 25:31process or you need to change with the
- 25:33Manpower or you need to change with
- 25:35technology or you need to change
- 25:38something else in order to be more
- 25:40efficient right so you need to identify
- 25:43the scope and then identify the
- 25:45requirements if you need to change the
- 25:47Manpower so why that requirement is
- 25:50there that means Manpower is not train
- 25:53fully so you cannot hire and fire just
- 25:56like that so what you can do you you can
- 25:58arrange the training and development
- 26:00programs for those people who are
- 26:02working on those critical stages so this
- 26:05is how it will happen so then you need
- 26:08to set logistics for event uh you need
- 26:11participants stakeholders if you are
- 26:13talking about process the process
- 26:15stakeholders will be there location
- 26:17where you are going to implement
- 26:18materials refreshment meals everything
- 26:20is required to you know this is a kind
- 26:23of Workshop you are going to conduct
- 26:25initial basis and then you will analyze
- 26:27the result of of that then you need to
- 26:30gather data let's say right now the
- 26:32problem you identified related to ontime
- 26:34delivery now this ontime delivery is not
- 26:37happening because
- 26:40because the career
- 26:43partner did not pick the product on
- 26:48time so that means now I need not to
- 26:51focus just on the distribution partner I
- 26:54need to focus on first on the that
- 26:58partner who was taking the product from
- 27:01the
- 27:02seller that career
- 27:05partner and
- 27:08shipping to the local Warehouse right
- 27:12and then from there it is going to
- 27:14customer right so this problem is with
- 27:17the this career partner he did not pick
- 27:19on time so then the problem uh came from
- 27:24there only so even if this corer partner
- 27:27is on time but because the initial delay
- 27:29happened so that will giving you will be
- 27:32giving you reple effect right so it will
- 27:34be uh you know effect uh it will affect
- 27:38your the whole process so you need to
- 27:41identify if you're talking about actual
- 27:43lead time what is the lead time output
- 27:45related issues are there cycle time you
- 27:48are not able to complete on time so
- 27:50whether you need to rethink about the
- 27:52cycle time or you need to uh reduce the
- 27:55unnecessary activities then defect rate
- 27:57quality related issues are there so that
- 27:59means you need to identify that thing
- 28:02and you need to analyze the collect the
- 28:04data right if I'm saying that map the
- 28:07flow of item and delivery ontime
- 28:10delivery was one big question so we
- 28:12mapped this flow of item so product
- 28:15started the journey from the seller
- 28:17right actually started the journey from
- 28:19the raw material supplier and then corer
- 28:21partner then again shipping agent is
- 28:23there then local warehouse distribution
- 28:25partner will be there who will be giving
- 28:27the uh final product so we need to find
- 28:30out the flow of the information and in
- 28:32that flow where the bottleneck is there
- 28:36right we need to identify that we need
- 28:38to then find out the future State okay
- 28:41future State and action plan now we
- 28:43identified that uh if we are saying 5
- 28:47days it will take so uh it will give you
- 28:51only 12 hours to the corer partner to
- 28:54pick the product from the seller right
- 28:56so if it is taking more than 20 hours
- 29:00you need to identify that this is the
- 29:02target this is the gap so you need to
- 29:03identify this as future state that we
- 29:05need to Target 12 hours that is maximum
- 29:08we can go for and then we will
- 29:10communicate this with the career partner
- 29:12that you need to pick after recording
- 29:14the order within 12 hours you need to
- 29:16pick the product right and if it is not
- 29:18happening maybe you need to change the
- 29:20technology because you are not able to
- 29:22share information quickly so then you
- 29:23need to do and then maybe sometimes
- 29:25training is required so let's say we'll
- 29:28explore this uh uh one worksheet uh the
- 29:32process or function let's say we are
- 29:34shipping the wrong
- 29:36product and why this happened Oris
- 29:39problem uh maybe the person who was
- 29:42sitting on that recorded wrong order
- 29:47wrong
- 29:47order recorded right now action items
- 29:51what we will do why the wrong order
- 29:53recorded I as a j customer I place the
- 29:56order with the restaurant and maybe
- 29:59restaurant uh that information was not
- 30:01shared accurately and in the end when I
- 30:04communicated with my kitchen so I
- 30:07communicated wrong items right so now
- 30:11lack is because human intervention is
- 30:15there why uh is it possible can be
- 30:19replac this if the order is directly
- 30:22coming to Jato can we share the exact
- 30:24information with the kitchen uh as uh
- 30:27through that Network so that this wrong
- 30:29shipment of item will not happen so
- 30:32we'll share that this who is responsible
- 30:34for this the technology people R&D
- 30:37people who can develop this platform
- 30:38right due date how we can Implement that
- 30:41and then we we'll record the matrices
- 30:43how we can uh improve those uh
- 30:46performances right and then in the end
- 30:48once we decided that this technology
- 30:51will be implemented so that we can
- 30:52ensure the uh delivery of the right
- 30:55product we need to execute the plan
- 30:58right and then once executed we need to
- 31:01align this and maybe many reviews may be
- 31:05required with respect to what you have
- 31:07been doing earlier right and then
- 31:09implementation and results whether that
- 31:12really affecting your performance Matrix
- 31:14or not that you need to record right so
- 31:18if the investment is this much right
- 31:21investment is this much and your result
- 31:23is this much you need to rethink about
- 31:26that because you contributed so much but
- 31:28the result is so maybe then you are
- 31:30addressing the wrong issue so then uh
- 31:33one you again you will review you will
- 31:35review in the with respect to the
- 31:37environmental changes right and then you
- 31:39will communicate the results whatever
- 31:41changes are required you will update
- 31:43those changes with the your technical
- 31:45team and in the end you will ensure that
- 31:47that wrong delivery should not happen a
- 31:50very simple example how we can implement
- 31:52this right so if you see I want to
- 31:55steple a paper and the complete process
- 31:58is given here I'll pick up the paper 1
- 32:02second I will take walk to steppler 5
- 32:04second I will take steple 2 seconds walk
- 32:07to desk again 5 Seconds put down the
- 32:10paper 1 second so total time if you will
- 32:13add is 6 8 13 14 right and if you'll see
- 32:19total distance you traveled is 140 40 ft
- 32:23but value added time is only you picked
- 32:26up the paper you stle the paper and you
- 32:29put down the paper that is only 4
- 32:31seconds so those 10 seconds are waste
- 32:36and value added distance no distance was
- 32:39required if your paper and Pen uh your
- 32:42steppler is there only this is very
- 32:43simple example so that distance also you
- 32:46can minimize right so you can see how
- 32:49you can be productive value added time
- 32:51was only
- 32:5228% so rest whatever you were doing was
- 32:55waste right so 72 2% of the things you
- 32:58are doing is waste right so uh we'll
- 33:02continue this discussion with the uh
- 33:05some uh more methodologies how we can
- 33:07implement the lean Logistics and
- 33:09obviously we'll go for one case so uh
- 33:12this is the reference list from where
- 33:14the content has been prepared and you
- 33:15can refer uh these books for more
- 33:18understanding better understanding of
- 33:19this right so uh that's all from this
- 33:22session we'll continue discussion on
- 33:24different methodologies in lean
- 33:26Logistics while you plan to implement
- 33:29lean Logistics in your operational area
- 33:31right and we'll go for uh uh Toyota
- 33:34production system as case study so thank
- 33:36you very much
About this transcript
This page contains the full transcript of Lecture 16 : Lean Logistics (Contd..) by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 5,385 words across 799 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.