- 0:25hello dear friends welcome again to nptl
- 0:28online course on Logistics and Supply
- 0:30Chain management so today in this
- 0:32session we'll extend our discussion
- 0:35we've started on reverse and Green
- 0:37Logistics we'll go into next the lean
- 0:40Logistics which is somehow will
- 0:42contribute in ensuring the reverse
- 0:45Logistics as well and Green Logistics
- 0:47and overall sustainable Logistics right
- 0:50so the basic concept under lean
- 0:52Logistics is how we can minimize the
- 0:55waste right so that is the basic concept
- 0:58of lean Logistics so we'll try to uh
- 1:01address the various aspects of lean
- 1:03Logistics in this session we'll discuss
- 1:05about the history we'll discuss about
- 1:07three M of uh how Japanese Industries
- 1:11are doing that because major uh if you
- 1:14talk about the Quality Concepts or major
- 1:17standards uh performance mattresses have
- 1:20come from the Japanese industry and then
- 1:24this lean PR uh manufacturing or lean
- 1:26Logistics concept is also implemented by
- 1:28Japanese organization first and then
- 1:31obviously now word is following these
- 1:34quality practices so we'll talk about
- 1:36the performance matters uh and uh what
- 1:39are the key indicators we'll talk about
- 1:41what are different methodologies and
- 1:43framework what are the challenges for
- 1:45implementing lean Logistics and then
- 1:47obviously we'll discuss about the case
- 1:49study so we'll spend couple of session
- 1:51on uh this lean Logistics as this is
- 1:54very very important part how we can go
- 1:58with more efficiency and effective iess
- 2:00and ensuring that the every time we can
- 2:03be uh 100% on time if you are talking
- 2:07about the delivery and if you are
- 2:09talking about quality also then 100% we
- 2:12should meet the quality as well as per
- 2:15the requirement of the customer so lean
- 2:18Logistics is to streamline the flow of
- 2:20material right so streamlining means
- 2:23when it is required let's say this is
- 2:26the supply
- 2:27chain uh and here our raw material
- 2:30suppliers are there and this is
- 2:33production line This is production line
- 2:35so many different stages are there and
- 2:38from here we are going for the
- 2:39distribution of the final product so raw
- 2:43material instead of storing the
- 2:46inventory here in your uh storage room
- 2:50right if why can't this happen that
- 2:52whenever I need 10 pieces so line wise
- 2:5610 pieces are coming on my production
- 2:58line so one by one I'll keep on
- 3:00processing those pieces and then the
- 3:02output will be there right so how that
- 3:05will be helpful in avoiding the
- 3:07inventory not only avoiding the
- 3:09inventory but also handling cost when
- 3:12you are storing in the store also the
- 3:15damages when you can do with the
- 3:17components when you are storing the
- 3:19product right and then the inventory you
- 3:22are maintaining all the time so that is
- 3:24also kind of capital you have invested
- 3:27which you will never utilize right if if
- 3:29you are maintaining that much inventory
- 3:31so lean Logistics uh focuses on
- 3:36eradicating all the inefficiencies or
- 3:39you can say if you are doing something
- 3:41in that Network in in any if you are
- 3:44doing some activity in Warehouse if you
- 3:46are doing some activity during
- 3:47Transportation or in manufacturing which
- 3:50is not adding any value to the End
- 3:52customer then that is something
- 3:54inefficient right so if you are saying
- 3:57that this for in invent
- 4:01you stored this product for 10 hours as
- 4:04a customer whether you stored for 10
- 4:07hours or 1 hour or you did not store you
- 4:09are directly shipping to me how it will
- 4:12you know add any value as a customer to
- 4:14me right so you are storing maybe
- 4:18because your supply chain is not smooth
- 4:21to ensure the smooth flow of the
- 4:24material maybe you are not insure about
- 4:26your demand then you are keeping the
- 4:28inventory but but you are keeping
- 4:30inventory how much you are keeping
- 4:32inventory as a customer as long as I'm
- 4:35going to your shop or your website I'm
- 4:38getting the product hardly matters for
- 4:40me what how much inventory you are
- 4:43keeping with your Warehouse right same
- 4:46is the case with packaging if I'm
- 4:48getting my product safe quality
- 4:51standards are met I will hardly bother
- 4:54about whether you are using uh single
- 4:56layer packaging double layer packaging
- 4:58or multi-layer Packaging
- 5:00right so these are some of the things we
- 5:02need to identify which are those
- 5:04activities which are adding value and
- 5:05which are non- adding uh nonv value
- 5:08adding activities so these are some of
- 5:10the definition you can just go through
- 5:12this lean Logistics focuses on
- 5:14eliminating waste improving efficiency
- 5:17in that way streamlining processes
- 5:19creating constant flow enhancing
- 5:21collaboration and achieving quality
- 5:24right so collaboration among
- 5:26stakeholders will be there throughout
- 5:27the supply chain only then this lean
- 5:30Logistics can be implemented right so if
- 5:33you are doing that you are more
- 5:35efficient and cost effective in that way
- 5:37if you are ensuring the lean Logistics
- 5:40so there is another definition which is
- 5:42describing lean Logistics to recognize
- 5:44and eliminate wasteful activities from
- 5:47the supply chain in order to increase
- 5:48the product flow and speed see these
- 5:52based basas of activities or byproducts
- 5:55you are producing like packaging this is
- 5:57not going to add any value so if you'll
- 5:59reduce this so that will also increase
- 6:03the speed of delivering the products and
- 6:05services so in that way you will be more
- 6:07efficient and then you can cut down the
- 6:09cost because you are not consuming those
- 6:11many resources so when if you are
- 6:13keeping the inventory for 10 hours you
- 6:15are consuming the resources for 10 hours
- 6:17so why to keep that uh inventory so
- 6:20there is one small video on just how you
- 6:23can utilize the maximum capacity in the
- 6:26container this is one way of
- 6:27implementing lean Logistics the same
- 6:30concept can be implemented in
- 6:31manufacturing and same com concept
- 6:34during your distribution and when you
- 6:36are moving through uh that distribution
- 6:39Network right so here is another video
- 6:41link you can just go through this video
- 6:43and you can relate the concept more
- 6:45closely with this right so uh dear
- 6:49students I'm again I'm assuming that
- 6:51that whenever I'm uh refering these
- 6:54video links you are going through
- 6:55because sometimes I'm including examples
- 6:57from there so you can for these videos
- 7:00okay so just you go through this link
- 7:03and we'll uh continue the discussion how
- 7:06using uh softwares or technology you can
- 7:09ensure the full utilization of the
- 7:11capacity of the container and how easily
- 7:14smoothly you can move the you know
- 7:16pallets inside the container and you
- 7:18just imagine when you are doing it
- 7:20manually how many hours you are taking
- 7:22to you know load that much capacity
- 7:25pallets those many pallets inside the
- 7:27container and then if you are talking
- 7:29about this kind of this is just simple
- 7:31arrangement of whatever uh uh these
- 7:35lifts you are using they have arranged
- 7:37just lift in that way that they are
- 7:39keeping inventory on that and within
- 7:41less than 2 minutes you are loading one
- 7:44full container right and then you are
- 7:46ensuring the maximum utilization of the
- 7:48capacity of the container but inside
- 7:51that pallet boxes whether you are
- 7:54utilizing fully those boxes or not that
- 7:56is another point so there also there is
- 7:58opportunity whether we can reduce the uh
- 8:01packaging whether we can make it more
- 8:03compact right so that you can uh in that
- 8:06way you can save some space inside the
- 8:09container this container traveling long
- 8:11distance so instead of maybe uh you are
- 8:15shipping 1,000 items can I ship maybe
- 8:171,50 items so then I will be more
- 8:20efficient so that per unit cost will
- 8:22come down because earlier whatever cost
- 8:24was we were dividing by 100 ,000 now we
- 8:27can divide by if you shipping 150 items
- 8:31and then per unit cost will come down
- 8:34right so if you'll Implement lean
- 8:36Logistics your efficiency will be
- 8:38improved you will reduce the cost and
- 8:41when you are efficient and reducing the
- 8:44cost obviously the customer is getting
- 8:47the product within less time and because
- 8:50you have having more margin in that so
- 8:52those margin can be used maybe you can
- 8:56keep some part as profit and some part
- 8:58you can share with your customers and uh
- 9:01maybe the customer will be more
- 9:03delighted with some offers and all that
- 9:05so that you can use or maybe you can
- 9:06provide some Advanced Services on that
- 9:09and then increased profit overall
- 9:10profitability you can ensure so and
- 9:13obviously more aile and responsive you
- 9:16will be uh uh in the market because now
- 9:21customer whatever customer is expecting
- 9:23in terms of services you are very quick
- 9:26handling all the disruptions you have FX
- 9:29exible supply chain distribution Network
- 9:31and you are responsible also at the same
- 9:33time you are efficient because you have
- 9:34eliminated all the waste so this lean
- 9:38term was uh coined by John krack and uh
- 9:43he discussed about this in his master
- 9:45thesis in 1988 where uh try to you know
- 9:49implement this lean Concept in
- 9:51manufacturing in warehousing shipping
- 9:54and various other functions but this was
- 9:56just uh the theoretical concept and and
- 9:59uh uh the just instructions were given
- 10:03how we can go for this what can be the
- 10:05different steps right but uh the
- 10:08properly this lean manufacturing concept
- 10:11was used by Toyota taii Ono uh engineer
- 10:15in Toyota who is well known in you know
- 10:17setting up the new quality standards and
- 10:20uh you know this lean manufacturing as
- 10:22well and they they try to you know
- 10:24eliminate the waste enhance the safety
- 10:26of the product and also touching the
- 10:28waterm line line for the Improvement
- 10:30where you will be more efficient and
- 10:32sustainable right so if we'll talk about
- 10:35this uh history now it organizations are
- 10:38also using lean Logistics right and uh
- 10:42because obviously this will happen only
- 10:45when just in time so just in time means
- 10:48again another tool which will help to
- 10:51ensure the lean
- 10:53Logistics so uh in that way we will try
- 10:56to optimize the value adding AC
- 10:59activities and will eliminate the non
- 11:01value adding activities like I told you
- 11:03you are keeping your inventory in your
- 11:06refrigerator in your Warehouse in your
- 11:08cold storage as a customer I'll hardly
- 11:12drive any value out of that you are
- 11:14putting uh double layer or triple layer
- 11:17packaging on your product it I'll not
- 11:19get any value as a customer out of that
- 11:22what value I'll get how many features
- 11:24extra you are adding into the product
- 11:26how is the quality of your product how
- 11:28quickly you are delivering the product
- 11:30and then how you are cost efficient in
- 11:32terms of what is the price right so
- 11:35talking about lean concept why we are
- 11:37talking about lean in logistics this is
- 11:40quite obvious so the share of this
- 11:43Logistics expenses somewhere 5 to 15% in
- 11:46some Industries somewh reach 25% also in
- 11:49retail right and we have talked about
- 11:52the reverse logistic concept also which
- 11:54is adding more uh uh you know verden on
- 11:58the uh Logistics industry to be more
- 12:01efficient in in terms of you know cost
- 12:03efficient so these are three quick
- 12:07pictures if you'll first see this I'm
- 12:10just giving you two three seconds you
- 12:11can just think about these pictures and
- 12:13what is happening and the terms are
- 12:16explained because these are again
- 12:17Japanese terms so mura muri mura so
- 12:21quick view first is you can see waste is
- 12:23happening overflow of the water second
- 12:26is the person is overburden what is his
- 12:29capacity he's taking more than that
- 12:31third is it is not balanced uneven so
- 12:35these three terms are muda muri mura how
- 12:38we can avoid these will lead to lean
- 12:40Logistics right first we'll take about
- 12:43muda this is the total capacity and we
- 12:45are utilizing this much only so rest of
- 12:48the capacity is waste this is waste how
- 12:50we can ensure that this if the room is
- 12:55that 100 people can sit and we are
- 12:57ensuring the AC facility for those 100
- 12:59people but only 10 are sitting at that
- 13:01time so then even the cooling facility
- 13:03is going in full way right so that way
- 13:07that small room can be used so that is
- 13:09unutilized capacity which is waste so we
- 13:13have identified seven types of waste in
- 13:17lean under lean first is your
- 13:20transportation T stands for
- 13:22transportation I stands for inventory m
- 13:25stands for your motion W stands for
- 13:29ating your o stand over production over
- 13:32processing and defects so anything you
- 13:35are doing here inventory again I told
- 13:38you the example is waste if I'm waiting
- 13:41for my product that waiting time is
- 13:43waste if let's say two workers are
- 13:46sitting on stage one stage two right now
- 13:49he is processing the product taking 2
- 13:51minutes and for that time he is just
- 13:53waiting because once he will process it
- 13:55will be shift to the de person so that
- 13:57means for 2 minutes he is sitting I so
- 13:59that is waiting if you are waiting in
- 14:01your maybe distribution network if you
- 14:03are waiting your career partner is
- 14:05baiting you you are placing the order
- 14:07through Jato so then Jato person career
- 14:10partner is standing outside the
- 14:12restaurant for 10 minutes or 15 minutes
- 14:14at that time you are preparing the food
- 14:16and it is taking time so how we can
- 14:18reduce that time how you can you know uh
- 14:22half cook item should be there that as
- 14:25soon as you are clicking on the order
- 14:26and your career partner is reaching at
- 14:29your restaurant your packet should be
- 14:31ready so how we can minimize if that can
- 14:33only happen if you have quick
- 14:34information sharing system right so if
- 14:37you are producing anything defect
- 14:39obviously is waste you cannot utilize
- 14:41that even if you will say we will repair
- 14:44we'll replace if as a customer I'm
- 14:47paying for new product why I should get
- 14:49the repaired one right so that is simple
- 14:51concept over production if you are
- 14:53producing something extra which is not
- 14:55required then it is waste motion if you
- 14:58are
- 14:59moving here and there in the workstation
- 15:01that means it is not designed properly I
- 15:03have included some examples also quickly
- 15:05we'll go through yes these are examples
- 15:07are there transport already we talked
- 15:09about if unnecessary movement is there
- 15:12during transportation that is waste
- 15:14customer is not going to uh derive any
- 15:16value out of that inventory you are
- 15:18keeping in terms of raw material in
- 15:20terms of work in uh in process in terms
- 15:23of finished good that is complete waste
- 15:25as a customer for me I cannot derive any
- 15:28value how how much raw material
- 15:29inventory you are keeping inside that
- 15:32motion this is what I was talking about
- 15:34waste of motion now this person is
- 15:36moving sometime to this bin sometime to
- 15:38workstation sometime he's carrying the
- 15:40product so jig Jag motion is there so
- 15:42that means while moving he is wasting
- 15:45time that is kind of extra motion extra
- 15:47waste this person is waiting for the
- 15:49call only then he'll respond to that so
- 15:52that is waste how you can ensure that
- 15:54smooth channel so that everyone every
- 15:57workstation should have some work to do
- 16:00and as a producer if you are producing
- 16:02more and then you are expecting that
- 16:03your customer should bear more than one
- 16:05cloth at a time that will not happen
- 16:07right if it is designed in that way only
- 16:10one t-shirt you can wear at a time so if
- 16:13other accessories you can wear over
- 16:14t-shirt or shirt you can wear some other
- 16:16stuff but you cannot wear two T-shirts
- 16:19at a time so even if you're producing
- 16:21more that will not help you then over
- 16:24processing let's say if you need to
- 16:26treat something at maybe 100°
- 16:29temperature and you you are using 150°
- 16:32right so that is something extra waste
- 16:34if you're cooking a simple example if
- 16:37you're baking your bread more than that
- 16:39temperature even in that process you are
- 16:42damaging that product as well and even
- 16:45you are wasting the energy so you
- 16:47consume more energy than required defect
- 16:50if anything is uh passing through your
- 16:53line which is defected so is kind of
- 16:56waste so some few based kind of waste
- 17:00have been included over the time if
- 17:02Talent is not utilized in mean Talent is
- 17:04also one kind of resource in the
- 17:06organization that is waste any resources
- 17:09I'm moving out of this uh recording room
- 17:12and still AC is on lights are on that is
- 17:14waste so how we can ensure that so
- 17:17sensor based lights you can use sensor
- 17:19based AC condition air conditioning
- 17:21facility you can use as long as you are
- 17:24there that will be functioning and after
- 17:26that it will be automatically turned off
- 17:29byproducts if you producing anything
- 17:31that is waste and if I'm saying I'm
- 17:34doing nothing in this organization still
- 17:36I'm getting salary is uh not something
- 17:39to be proud of that means you are not
- 17:41aligned to the goal of that organization
- 17:44and the problem is with the designing of
- 17:46the roles and responsibility of the that
- 17:49particular worker who is feeling that he
- 17:50is Idle not getting enough stuff to work
- 17:53right how we can implement this in
- 17:57inventory how we can
- 17:59uh minimize the inventory just to meet
- 18:02the demand we should not ensure the
- 18:04excess inventory right so just in time
- 18:07you can do that warehousing in Warehouse
- 18:10how F utilization of the warehouse in
- 18:13terms of capacity of the warehouse you
- 18:15are ensuring right and then minimum
- 18:18handling you can ensure right how you
- 18:21can ensure the proper stock rotation in
- 18:24the warehouse so that it should not be
- 18:27Obsolete and expired in the warehouse
- 18:30only right so those are we have
- 18:33discussed in warehousing uh session that
- 18:36what are the key performance indicators
- 18:38so all those indicators if you'll manage
- 18:40properly in that way you can be
- 18:42efficient how in your Warehouse you can
- 18:44use uh sustainable or renewable sources
- 18:46of energy to lighten your Warehouse
- 18:49right those kind of initiatives you can
- 18:51do trucks how you can ensure the full
- 18:53capacity you are utilizing the truck
- 18:56while rooting uh during your truck
- 18:58Transportation how you can ensure the
- 19:01minimum distance your truck should cover
- 19:04right so those many things travel if you
- 19:06are traveling somewhere for any work the
- 19:09travel time is wastage right so how I
- 19:12can reduce the travel time if I'm coming
- 19:15to you personally somewhere to your
- 19:16place so addressing those many audience
- 19:19will be time taking right so it is uh
- 19:22better way that we can record the
- 19:24lectures we can have the interactive
- 19:26sessions as well and then sitting at
- 19:28different places we can share the
- 19:30knowledge and information right people
- 19:33if people are there who like I told you
- 19:36waiting for their turn and uh for
- 19:39getting the product to be processed so
- 19:41that is waste if you're not using the
- 19:43you know skills of the of your Manpower
- 19:46even then that is waste so electrical
- 19:49Vehicles how electrical vehicles uh
- 19:52obviously can help you to develop the
- 19:54sustainable Transportation solution so
- 19:56this is all about muda waste how we can
- 19:59reduce the waste now
- 20:01muuri this this session will talk about
- 20:05what are the different types of uh
- 20:07issues are there when we are talking
- 20:08about lean manufacturing or lean
- 20:10Logistics in the next session we'll talk
- 20:13about what are the different
- 20:14methodologies we can use where we can
- 20:16ensure the lean practices within the
- 20:18organization so overden so this is
- 20:21because of why you are feeling overden
- 20:24because maybe last two days you did not
- 20:26work so now you are over occupied that
- 20:28is one reason right or maybe there was
- 20:31no demand for uh if you are barber or uh
- 20:35you are doing some giving some Services
- 20:37right so for 2 hours there was no
- 20:40customer for next 10 minutes maybe 10
- 20:43turned up right so then how you will
- 20:45manage that you are overburden then
- 20:46right but in Services you cannot avoid
- 20:49those things right so if you are doing
- 20:51overburden kind of thing there will be
- 20:53breakdowns there will be absentismo
- 20:55[Music]
- 20:56are now feeling over burden and these
- 20:59are some of the example when you will
- 21:01fear
- 21:02overburden when you are doing those
- 21:04processes you are not trained for you
- 21:06don't know how to do that poorly laid
- 21:09out workplace where the workplace is not
- 21:12designed efficiently and because of that
- 21:14you are lacking with your work unclear
- 21:16instructions out obviously if you are
- 21:18not clear about the job how you'll feel
- 21:20you will be feeling all the time uh
- 21:22overloaded right lack of proper tools
- 21:25and equipment obviously will lead the
- 21:27pending of the work fluctuating demand
- 21:29is mura right so if fluctuating demand
- 21:33is there even then sometime demand there
- 21:34is no demand and then there suddenly
- 21:37demand will come so overburden will be
- 21:38there lack of proper maintenance will
- 21:40lead to overburden unreliable processes
- 21:43poor communication roots in terms of
- 21:45because you could not identify that how
- 21:48much demand could be for maybe the next
- 21:51few uh months so then you predicted it
- 21:54wrong for the season and then now you
- 21:57are overburdened doing extra shifts and
- 21:59double shifts and all that in that way
- 22:01you are putting extra load on your
- 22:03system Your Capacity is this much but if
- 22:05you'll stretch Beyond Your Capacity so
- 22:08then beer and teer and one out will be
- 22:10there third point is unevenness now
- 22:13unevenness is sometimes because I did
- 22:15not work so now sometimes I'm not
- 22:18working at all and then maybe for next
- 22:20two days I'm uh all on the work from
- 22:24morning to evening so if that thing is
- 22:26happening so that means that you are
- 22:28inconsistent in that way so you should
- 22:32smooth out this right the very basic
- 22:34reason why you should smooth out your
- 22:36production process because when you have
- 22:39overburden in that process you'll
- 22:42quickly you know process the things and
- 22:44then you will produce the defected items
- 22:46you may damage the products so quality
- 22:48will be compromised and this is very uh
- 22:52common uh example or obvious things if
- 22:55I'm giving you assignment and I'm saying
- 22:58that maybe after 4 weeks you you need to
- 23:00submit it in the very first week you
- 23:03will be just thinking about the
- 23:05assignment oh we have one pending
- 23:07assignment second week then you'll start
- 23:09calculating okay these many days are
- 23:11left okay I need to you know work out
- 23:13little bit for that what is that topic
- 23:15okay what can be there in that we will
- 23:17think just third week now you are
- 23:19approaching next week is the submission
- 23:22date okay let's start something working
- 23:24on that let us start at least the
- 23:26introduction part of that and in the
- 23:28last last week we are targeting 17 to
- 23:3080% right so this is the human tendency
- 23:34so we are usually stretched up in the
- 23:38last week of the month when we need to
- 23:39meet the your uh whatever targets were
- 23:42set in the initially and because this is
- 23:45happening with all uh stakeholders even
- 23:49we will feel the shortage of the raw
- 23:51material supplier because raw material
- 23:53suppliers are also behaving in the same
- 23:55pattern that Hy stick kind of graph you
- 23:58are get getting that in the first week
- 24:00uh so in that way we need to smooth out
- 24:02the production throughout right so in
- 24:04that way we can avoid the
- 24:07unevenness principles of lean Logistics
- 24:09eliminating waste is the basic principle
- 24:12if you are doing something you don't
- 24:14know how it is adding value that is
- 24:17waste improving efficiency if you will
- 24:20eliminate the waste obviously the cycle
- 24:22time will be reduced if you are keeping
- 24:24the inventory uh minimum inventory or
- 24:28you are making minimum stoppage in the
- 24:30warehouse Center you are just doing the
- 24:32cross talking so that means that much
- 24:34time you are not wasting you can make
- 24:35the quick delivery so one step is
- 24:38related to The Next Step if you'll
- 24:40improve the suppliers automatically your
- 24:42next chain will be improved your
- 24:44manufacturing will be smoo out if you'll
- 24:47ensure the smooth manufacturing your
- 24:49next distribution network will be uh in
- 24:52that way streamlined so you need to
- 24:55streamline the full distribution Network
- 24:57so this is what I talked about
- 24:58streamline the processes all unnecessary
- 25:01steps which are not adding value so for
- 25:04that which are not adding value you need
- 25:07to improve the visibility what is
- 25:09happening if 100 people are coming in my
- 25:12organization daily I need to analyze
- 25:15what the people all those people are
- 25:17doing what is the work on their
- 25:18workstation I cannot design workstation
- 25:21for a one person who where he is heavily
- 25:24loaded and the other person he is
- 25:26enjoying all all the day right so that
- 25:28cannot happen so then creating constant
- 25:31flow so if those those many stages are
- 25:34there all should have almost equal work
- 25:36to work on the workstation right so that
- 25:40constant flow we need to ensure and I
- 25:43told you this will start with your
- 25:45supplier and if your supplier is in that
- 25:48way smooth your manufacturing will be
- 25:50smooth and if your manufacturing is
- 25:53smooth your distribution network will
- 25:55work in a smooth way and in the end
- 25:58ontime delivery will happen to the End
- 26:01customer right so that way you need to
- 26:04enhance the collaboration with all the
- 26:06stakeholders so lean concept cannot be
- 26:09implemented with one particular
- 26:10organization within manufacturing only
- 26:13right achieving quality so because very
- 26:17simple example if you are storing any
- 26:19product for 2
- 26:21months or the product you are storing
- 26:24only for 10 days obviously the quality
- 26:27will be degraded if you have not used
- 26:30that product for 2
- 26:32months if you are handling you are
- 26:34moving in the warehouse here and there
- 26:36just to manage the space even then you
- 26:37are damaging the quality right so as
- 26:40long as so you have the demand your
- 26:44distribution network is efficient enough
- 26:47and you are ready with the product in
- 26:49cck view so then it should be shipped to
- 26:52the market as soon as possible Right
- 26:55only when you will ship the product to
- 26:57the market only then you will be able to
- 26:59generate that Revenue out of that and
- 27:01when you are not storing for longer you
- 27:03can maintain the quality of that so
- 27:05these are some of the performance key
- 27:07matrices already we discussed these uh
- 27:10terms in terms of when we talked about
- 27:12the uh Logistics performance but in
- 27:14terms of lean Logistics we'll see how
- 27:18these things are adding towards the lean
- 27:20Logistics on time delivery how many
- 27:22times we are on time so if you have
- 27:26reduced the based activities you will be
- 27:28on time lead time how much time you are
- 27:31taking to deliver the product if you are
- 27:34having shorter lead time that means you
- 27:36have uh streamlined your processes and
- 27:39you are consuming the minimum time
- 27:41during the distribution Network
- 27:43inventory turnover if you are keeping
- 27:45minimum inventory that means quickly you
- 27:48are replacing the stock you are moving
- 27:50the material in the market and quickly
- 27:52you are replacing the stock that means
- 27:54your minimum time your inventory is
- 27:57making the temporary stoppage in your
- 27:59Warehouse order accuracy how many times
- 28:02you are delivering the accurate order
- 28:05accurate order on accurate time with
- 28:07accurate quality right so that is means
- 28:10complete order transaction cost per unit
- 28:13if in Bur truck you are carrying 10
- 28:16items and cost is 100 so obviously
- 28:19carrying one unit your cost will be 10
- 28:22Rupees if I'm carrying maybe 20 items in
- 28:25the same truck same cost will be there
- 28:28maybe the cost will be 5 rupees may not
- 28:30be same if uh maybe it will increase a
- 28:33little bit even then per unit cost will
- 28:36reduce maybe from uh 10 to it will
- 28:39reduce 6 rupes per unit or 7 rupees per
- 28:41unit so you need to ensure the complete
- 28:44uh you know utilization of the uh
- 28:47capacity this is Warehouse utilization
- 28:50how much space is utilized cycle time
- 28:53for any activity cycle time is when you
- 28:55are starting and when you are ending so
- 28:57you need to record the cycle time of all
- 28:59the activities you are doing during your
- 29:01distribution Network dock to stock time
- 29:04how much time you are taking you
- 29:06received the stock and then it is on the
- 29:08invent uh your uh Warehouse shelf for
- 29:11selling purposes right so how quickly it
- 29:13is moving that return rate high return
- 29:16rate that means your products are
- 29:18meeting not meeting the expectations
- 29:21defects are there so that means your
- 29:23manufacturing is somewhere in the
- 29:24question if you are damaging the
- 29:26products during your distribution
- 29:28then there is a question with the
- 29:30packaging with the handling so that
- 29:33return rate you need to analyze so order
- 29:36fulfillment cycle how quickly you are
- 29:39fulfilling the order when you are
- 29:40receiving the order and how quickly it
- 29:42is fulfilled perfect order rate perfect
- 29:46order rate is not only ontime delivery
- 29:48ontime
- 29:50delivery complete order fulfillment
- 29:52intact product I told you on time with
- 29:56quality right and your complete order
- 29:59should be delivered right and then back
- 30:01order rate back order is something if
- 30:03customer is coming to me I could not
- 30:06meet the demand because insufficient
- 30:08inventory was there so then I'll that is
- 30:11a kind of back order so maybe I'll take
- 30:14some time maybe next few hours I'll
- 30:16deliver next few days I'll deliver so
- 30:18that is back over it so how we can
- 30:20reduce this back over order rate that
- 30:23will help uh when you will analyze you
- 30:26know uh perfectly your market conditions
- 30:28and perfectly your demand supplier on
- 30:31time delivery performance how many times
- 30:33your suppliers are delivering on time so
- 30:36you can develop the schedule for the
- 30:38suppliers and you can record the
- 30:39performance so that next time when
- 30:42giving orders you can keep in mind as
- 30:44one of the parameter that this supplier
- 30:46is mostly on time 90% on time 95% on
- 30:50time so we should give maximum order to
- 30:52this order lead time variability if one
- 30:55supplier is like that in one order he
- 30:59delivered order two days before for next
- 31:01order he is delivering maybe 5 days late
- 31:04so all the all always there is
- 31:07inconsistency so in that way that
- 31:09supplier is not reliable you can never
- 31:12rely on that if it is consistently late
- 31:15we can take that margin that instead of
- 31:17five days he will take six or seven days
- 31:19so we are ready for that those many days
- 31:22but sometimes he is delivering in 3 days
- 31:24sometimes in 10 days then we cannot plan
- 31:26for that shipment Dam damage rate during
- 31:28distribution how many products are
- 31:30shipped how uh damaged how many what is
- 31:33the percentage so that you can see
- 31:35sustainability Matrix you need to record
- 31:38the carbon emission during your
- 31:39distribution warehous Transportation
- 31:41energy how much you are consuming waste
- 31:44how much waste as byproduct you are uh
- 31:47uh generating and then you need to
- 31:49engage your employees you need to
- 31:51provide the training to your employees
- 31:53only then motivated employees will work
- 31:55properly so this is all about about uh
- 31:58the various concepts of lean Logistics
- 32:00right uh and we have seen how we can
- 32:03what are the different types of waste
- 32:05how we can address that in the next
- 32:06session we'll continue this discussion
- 32:08we will be discussing on the various
- 32:10methodologies to overcome these waste so
- 32:13these are some of the references so
- 32:15that's all from this session thank you
- 32:17very much
About this transcript
This page contains the full transcript of Lecture 15 : Lean Logistics by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 5,301 words across 772 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.