  1. 0:01[Music]
  2. 0:22[Music]
  3. 0:26so welcome back to this nptl online
  4. 0:28course on Logistics and supply chain
  5. 0:30management I'm Dr vikas takur from IIT
  6. 0:32kakur so uh in the last session we were
  7. 0:35discussing about the tools for improving
  8. 0:38the logistics efficiency and uh in that
  9. 0:40we discussed the very first tool is plan
  10. 0:43do check act cycle uh given by Professor
  11. 0:46uh Edwards Deming and now we'll continue
  12. 0:50with the seven QC tools uh in this
  13. 0:53session and we'll discuss about the
  14. 0:55quality Circle 5S approach and
  15. 0:57benchmarking how these Concepts can be
  16. 0:59used used to improve the overall
  17. 1:01Logistics
  18. 1:03performance so these are the seven
  19. 1:05quality tools uh given by Professor K
  20. 1:08ishik Kaba and uh you can see uh we have
  21. 1:12uh the cause effect diagram then we we
  22. 1:16we can use flow chart we can use check
  23. 1:19sheets then par charts histograms
  24. 1:22control charts and Scatter diagram so
  25. 1:26this is the complete set of tools which
  26. 1:28can be uh used just starting with the
  27. 1:34diagnosing the problem and reaching to
  28. 1:37the end solution how we can Implement
  29. 1:40that uh solution and that problem can be
  30. 1:42solved even you can track the
  31. 1:44performance as well after implementing
  32. 1:47that solution you can track the
  33. 1:49performance so these seven QC tools will
  34. 1:52just go through how these can be used in
  35. 1:55a sequence so that we can analyze our
  36. 1:58complete problem so very first is
  37. 2:01flowchart right in the last session as I
  38. 2:05talked about uh a Control process where
  39. 2:08we we talked about some process and then
  40. 2:11we we saw that this process is giving
  41. 2:15some output we are processing and then
  42. 2:18this output is being compared with some
  43. 2:20standards and if de any deviation is
  44. 2:24there yes so then we are taking the
  45. 2:27corrective and preventive action and
  46. 2:29again going with the change in process
  47. 2:32change in raw material change in output
  48. 2:34all technology if it is no we will
  49. 2:37continue with the same process this is
  50. 2:39again a kind of flow chart I'm just
  51. 2:41giving you all the steps right so this
  52. 2:45is a kind of decision making stage I can
  53. 2:47highlight this decision making like this
  54. 2:49if any process I'm doing I can highlight
  55. 2:51like this if this is the start uh this
  56. 2:54is how it is highlighted the end is
  57. 2:57highlighted like this right so the I
  58. 3:01means different uh shapes we are using
  59. 3:04just to uh represent different stages in
  60. 3:07that flowchart now why flowchart is used
  61. 3:10just to you know have the quick
  62. 3:12understanding of the uh any process okay
  63. 3:16how it is happening so it will give you
  64. 3:18the better Clarity visibility instead of
  65. 3:20Reading Writing the long paragraphs
  66. 3:23right so this is one example you can see
  67. 3:26here on your screen how the
  68. 3:27manufacturing company of electronic
  69. 3:30gadgets they are doing with assembly is
  70. 3:32starting here so step one component they
  71. 3:34are checking second stage maybe assembly
  72. 3:37line is there there are so many
  73. 3:38different stages they are doing assembly
  74. 3:41on those stages then decision point is
  75. 3:44whether quality check is needed or it is
  76. 3:46error free right or uh 100% inspection
  77. 3:50or maybe uh the quality uh inspection is
  78. 3:53not required right if it is required
  79. 3:55we'll go for check sheet we'll do the
  80. 3:57sampling we'll pick some samples out of
  81. 3:59the product and then we'll check whether
  82. 4:02any defect is
  83. 4:03identified if it is identified then
  84. 4:06again we need
  85. 4:08to we need to go for the assembly we
  86. 4:11need to check the component whether
  87. 4:13component is faulty or there is
  88. 4:15something wrong with the assembly line
  89. 4:17right so if no nothing is required test
  90. 4:20is required we'll continue with the
  91. 4:22final product and then final product
  92. 4:24testing happens so then again there is
  93. 4:27decision Point whether this final is
  94. 4:30okay or not then final assembly is
  95. 4:32happening production is complete and
  96. 4:33this is the complete end so see in the
  97. 4:36flowchart how easily you can understand
  98. 4:39how the things are flowing in the in the
  99. 4:41logistics Network also we need we have
  100. 4:43discussed this complete flow chart right
  101. 4:46from your first supplier how things are
  102. 4:49moving through your transportation
  103. 4:51Network reaching to your manufacturing
  104. 4:53facility then again through all the long
  105. 4:56chain of your sto uh stockholders
  106. 4:59forward agent wholesalers distributor
  107. 5:02retailers reaching to the End customer
  108. 5:05right so that also flowchart uh you can
  109. 5:08just draw the flowcharts right now what
  110. 5:10inferences we can make out of that so
  111. 5:13this is reveals bottlenecks and in
  112. 5:15efficiency so flowchart will help you to
  113. 5:18identify where is the problem so how
  114. 5:21bottlenecks you can identify I'll give
  115. 5:23you very small example let's say I have
  116. 5:26designed these five stages in the
  117. 5:28assembly so product is entering here
  118. 5:31leaving here this is finished good is
  119. 5:33leaving here raw material is entering
  120. 5:35here maybe on different stages we are
  121. 5:37using some more components on on that
  122. 5:40stage right so then in terms of that raw
  123. 5:43material will can enter any stage new
  124. 5:45raw material obviously sub assembly will
  125. 5:47move through this conveyor belt now
  126. 5:49let's say for processing this stage we
  127. 5:52are taking 5 seconds for this 6 seconds
  128. 5:544 seconds then maybe uh 8 seconds and
  129. 5:58then maybe you are taking again 6
  130. 6:01seconds this is how you have designed
  131. 6:04now through this flow chart you can
  132. 6:06easily identified that this can be your
  133. 6:10bottleneck because it is taking 8
  134. 6:12seconds almost double of the last stage
  135. 6:16this also taking 6 seconds again 2
  136. 6:19seconds more than that so if I'll take
  137. 6:21this stage only between this and this
  138. 6:24this person will process two products at
  139. 6:27that time but this will pass only one
  140. 6:29prodct product right so that means in
  141. 6:33the end only 50% semi products semi
  142. 6:37finished products he is able to pass who
  143. 6:40is sitting on this fourth number stage
  144. 6:43and rest 50% will be the uh pending you
  145. 6:47can say pending stock is there on his
  146. 6:50stage so that means this is the
  147. 6:52bottleneck and restricting your
  148. 6:55efficiency how we can do improve that we
  149. 6:58can we need to think whether we can go
  150. 7:00for parallel stage the person is also
  151. 7:03sitting there so that half of the 50% of
  152. 7:05the product he will process 50% of the
  153. 7:08product he will process right and if
  154. 7:11dedicated two workstations are not
  155. 7:13required maybe temporarily we can
  156. 7:16assign uh the other workstation and then
  157. 7:19we can go so this is how the process
  158. 7:21flow chart will help you to streamline
  159. 7:23the uh things throughout your
  160. 7:26distribution Network throughout your
  161. 7:27packaging if some big pack packets are
  162. 7:29taking time small packets or delicate
  163. 7:31items are taking time and then because
  164. 7:34you are shipping all the products
  165. 7:36related to one pin code and then all
  166. 7:38those different types of products are
  167. 7:40there so how you can be more efficient
  168. 7:43Saving Time right so this will help you
  169. 7:45to understand that and then you can
  170. 7:47obviously uh the process which is taking
  171. 7:50longer you can uh make decision on that
  172. 7:52so more informed decision will be there
  173. 7:55so action taken you can reduce the
  174. 7:57bottlenecks you can opt op imiz time
  175. 8:00consuming process right and then
  176. 8:02additional training is provided to the
  177. 8:04line worker to be more efficient maybe
  178. 8:07we will stretch these workers who are
  179. 8:10taking five or six seconds to be more
  180. 8:12efficient maybe in that way or maybe we
  181. 8:14can change some technology also in that
  182. 8:17way so that the it can be comparable to
  183. 8:20somewhere 4 to 4.5 seconds so that all
  184. 8:24the stages are uniformly designed so
  185. 8:26that there should not be any pending
  186. 8:28work on any stage right then it will
  187. 8:30help you to check the quality also
  188. 8:33because let's say on this stage
  189. 8:36particular two stage very critical stage
  190. 8:38and most of the complaints let's say
  191. 8:40like we talked about the packaging
  192. 8:41related complaints are coming from this
  193. 8:44stage so then we need to increase the
  194. 8:49inspection here see the very this is uh
  195. 8:54uh misconception that quality
  196. 8:57means checking no quality we should
  197. 9:02Target in such a way that quality should
  198. 9:04be seized after some time quality team
  199. 9:07should work towards that after some
  200. 9:10duration there should not be any
  201. 9:12requirement of the inspection right so
  202. 9:15we should build the quality in the
  203. 9:17design of the product we should build
  204. 9:18the quality in the design of the
  205. 9:20packaging we should build the quality in
  206. 9:22the process where we are doing the
  207. 9:23packaging where we are transporting
  208. 9:25where we are keeping in the warehouses
  209. 9:28why the inventory is outdated why it is
  210. 9:30expired in the warehouse why our system
  211. 9:33did not give the alarming uh situation
  212. 9:36that now only few days are left few
  213. 9:38weeks are left and you need to rotate
  214. 9:41the stock right so that indication our
  215. 9:44warehouse automatically should be it
  216. 9:46should be circulated to all the
  217. 9:48stakeholder so that that inventory can
  218. 9:50be consumed first in the market second
  219. 9:53point is the second tool is check sheets
  220. 9:56so usually check sheet uh you might have
  221. 9:59seen check sheets in day routine life if
  222. 10:01you are traveling through maybe train
  223. 10:05through air so after completing your uh
  224. 10:08Journey they are sending you one kind of
  225. 10:10feedback form check sheet so you can
  226. 10:13evaluate as per how the staff was
  227. 10:16dealing with you the clean lless the
  228. 10:19services provided on on the plane and
  229. 10:22then all those things right so so that
  230. 10:25it will give them you know uh kind of
  231. 10:27direct touch that uh you are inter in
  232. 10:29with the customer and in that way you
  233. 10:31can somewhere you can also get a chance
  234. 10:33to improve your services right so check
  235. 10:35sheet is a kind of thing Dr isikawa has
  236. 10:38given this concept of collect this is a
  237. 10:40way of collecting the data right so
  238. 10:42through your check sheeet you can
  239. 10:43collect the data where the Falls are
  240. 10:45happening check sheet is also uh like we
  241. 10:48designed that most of the complaints are
  242. 10:50coming from packaging so you can see
  243. 10:53number of occurrences if Monday we see
  244. 10:56bottle brokens two right cap loose
  245. 11:01Monday nothing Tuesday two in that way
  246. 11:04we can see missing label also we have so
  247. 11:07this is a kind of check sheet so in the
  248. 11:09end we can analyze why this is happening
  249. 11:12if on one stage consistently something
  250. 11:14is happening wrong order that means who
  251. 11:17is the operator where is the location
  252. 11:20date section everything we so that we
  253. 11:22can identify the problem where the
  254. 11:25problem is like we identified initially
  255. 11:27now I have given you that image you can
  256. 11:29just relate with that example very basic
  257. 11:32example why we need to find out that the
  258. 11:36B very basic root cause right and damage
  259. 11:39while packaging how many times we did
  260. 11:41that and what are the reasons maybe in
  261. 11:44the weekend the uh defects are more
  262. 11:47maybe people are in uh rush to you know
  263. 11:50leave the workstation to go for their
  264. 11:52weekend plans and all that that can be
  265. 11:54one of the reason maybe Monday um uh
  266. 11:57more faults are coming complaints are
  267. 11:59coming because uh just they are coming
  268. 12:01after enjoying their weekend so it is
  269. 12:03little difficult to concentrate back on
  270. 12:05the workstation and all those things
  271. 12:07maybe right so this is a way how you
  272. 12:10this is just one tool to collect the
  273. 12:12data so first your flow chart you can
  274. 12:15understand the complete process second
  275. 12:17just check sheet is required to just
  276. 12:19record the data where the faults are
  277. 12:22happening and what is the frequency of
  278. 12:24those faults right and simple one case
  279. 12:27is there you can just see a man
  280. 12:29manfacturing company produces electronic
  281. 12:30components and they are tracking where
  282. 12:33the problem is so date of production you
  283. 12:36can find out when exactly that complaint
  284. 12:38happened type of defect is there any
  285. 12:41defect with the manufacturing process
  286. 12:43soldiering issue or maybe component
  287. 12:45misaligned or maybe damaged component
  288. 12:48faulty your packaging or maybe faulty
  289. 12:52process so location of defect like I
  290. 12:55told you it was done in a shift B shift
  291. 12:58dshift or or at what which workstation
  292. 13:01workstation fifth or 10th or 12th or
  293. 13:03which one is responsible so that we can
  294. 13:05increase the sampling or inspection rate
  295. 13:07at that particular stage or we can think
  296. 13:10of giving the training to that person
  297. 13:12who is working on that stage where those
  298. 13:14faults are occurring right we can find
  299. 13:17out the shift then operator we can find
  300. 13:19out specifically so that if special
  301. 13:21attention is required and if this is
  302. 13:24somewhere around the industry average we
  303. 13:27need not to bother much about that but
  304. 13:29still we should go for the regular
  305. 13:30training then of all the staff obviously
  306. 13:33or if it is something out of the box
  307. 13:36things are happening and many faults are
  308. 13:38coming so then we need to identify the
  309. 13:41particular person so that we can go with
  310. 13:43the things with that particular person
  311. 13:45only so what actions we can take we can
  312. 13:47identify the root cause of the defects
  313. 13:49and if it is happening somewhere in the
  314. 13:51manufacturing in the uh loading of the
  315. 13:54truck in unloading in storing in the
  316. 13:57cold storage or while packaging the
  317. 13:59product then then those stages you can
  318. 14:02Define and specific quality check sheet
  319. 14:04you can prepare related to those right
  320. 14:07so then targeted training program like I
  321. 14:10told you if this is the problem with
  322. 14:11some particular operator you can do this
  323. 14:14is not only the only the person can be
  324. 14:16at fault let's say you have completely
  325. 14:18automated Warehouse so robots are
  326. 14:20working so even then if it is The Fault
  327. 14:22With the machine so sometimes that can
  328. 14:24also happen continuously working
  329. 14:27continuously machine is working bear and
  330. 14:29can happen so then you need to check for
  331. 14:31that also right so results will be you
  332. 14:34can see the Improvement in quality when
  333. 14:36you will be implementing uh uh the
  334. 14:38identified root cause right so common
  335. 14:41type of defects you can find out so in
  336. 14:44that way you can build a sustainable
  337. 14:47environment of quality management
  338. 14:49through your Logistics distribution so
  339. 14:51in the end this is one acknowledgement
  340. 14:54you will get from the end stakeholder of
  341. 14:57that uh distribution Network if you are
  342. 15:00doing all the you are ticking all the
  343. 15:02points in the check sheets now third
  344. 15:05tool is histogram now we recorded the
  345. 15:09data now histogram will give you the
  346. 15:11pictorial representation that this is
  347. 15:13Fault one this is Fault 2 this is Fault
  348. 15:17three so this is like what is the
  349. 15:19frequency of these faults 5 10 15 20
  350. 15:23like this quick view I can get
  351. 15:26right and let's say uh you can compare
  352. 15:29month-wise as well January we have three
  353. 15:32faults let's say for January month so
  354. 15:36let's say we have
  355. 15:39uh like this so fault one fault two
  356. 15:44fault three February
  357. 15:51again so this one 2 3 like likewise you
  358. 15:55can continue so I can just see uh in any
  359. 15:59month this fault two is very high and
  360. 16:02next is Fault three so first I should
  361. 16:05prioritize fault two then I should pay
  362. 16:07attention to fault three then I should
  363. 16:09move to fault one so this will give you
  364. 16:11quick indication where you should go so
  365. 16:14histogram will help you to in that way
  366. 16:16so this is one case restaurant chain
  367. 16:19they want to enhance the both food
  368. 16:21quality and customer satisfaction
  369. 16:23obviously then you need to talk about
  370. 16:26the delivery time how they can do that
  371. 16:28right so they have collected some data
  372. 16:31and uh they have organized this data how
  373. 16:34many times they are making the delivery
  374. 16:37between 10 to 15 minutes how many times
  375. 16:39between 15 to 20 minutes 20 to 25
  376. 16:41minutes so these many times you are
  377. 16:42making the delivery so this is a quick
  378. 16:45review that you can analyze that you are
  379. 16:48taking the maximum time here and here so
  380. 16:51somewhere here normal distribution curve
  381. 16:53also you can draw on that right
  382. 16:56so uh this will help you to understand
  383. 16:59understand where you need to fasten up
  384. 17:00the things where you need to go for
  385. 17:03maybe half cook item you can keep with
  386. 17:05you so that order if those kind of
  387. 17:07products are there which are in
  388. 17:08continuous supply and demand so then you
  389. 17:11can manage in that way and you can
  390. 17:13minimize the time right so your
  391. 17:15histogram will help you to understand
  392. 17:17that so realtime performance monitoring
  393. 17:20system can be implemented by tracking
  394. 17:23the delivery
  395. 17:24times so once you will Implement that
  396. 17:27you can see now the delivery Peak if 25
  397. 17:32to 30 minutes you can further reduce it
  398. 17:34if you are finding out the bottleneck
  399. 17:37and you will be more consistent it will
  400. 17:39not be like this that sometimes you are
  401. 17:41here taking more time sometimes here so
  402. 17:43that you can be more consistent in that
  403. 17:46way right and when you are consistent so
  404. 17:48customer satisfaction see if one day I'm
  405. 17:51providing services within 5 minutes and
  406. 17:54next day I'm providing services in two
  407. 17:56uh 25 minutes so see same customer if
  408. 17:59coming to you so obviously if I got
  409. 18:01first day 5 minute Services anywhere you
  410. 18:04are taking 25 minutes I will be highly
  411. 18:07dissatisfied right if on an average
  412. 18:10continuously consistently you are taking
  413. 18:1215 to 20 minutes maybe whenever I'm
  414. 18:14coming to your store I know that this
  415. 18:17person will take average this much time
  416. 18:19so mentally I'm prepared that way right
  417. 18:21so that is also kind of thing that you
  418. 18:24know customer mind and psychology it's
  419. 18:27very difficult so the same situation
  420. 18:30sometime customer may take as a positive
  421. 18:32sometimes may take as negative so again
  422. 18:35I told you as per month Jan Feb March
  423. 18:39you can uh Analyze This there is another
  424. 18:42way these are the
  425. 18:44defects right and when these defects
  426. 18:47happen that also this is day shift one
  427. 18:50shift two shift three so all the time
  428. 18:53you can see that reasonably shift one
  429. 18:56defects are very high right and then
  430. 18:59shift two defects are also increasing
  431. 19:02okay so what are those defects this is
  432. 19:05wrong color doesn't light up when you
  433. 19:08turned on did not turn on right too
  434. 19:11small or maybe size not fitting right so
  435. 19:15put the wrong label on that or wrong
  436. 19:17size information so that way you can
  437. 19:20just find out you can this see how
  438. 19:23quickly you instead of going through the
  439. 19:25long tables and then information data
  440. 19:28you can just just uh get the picture in
  441. 19:31no time
  442. 19:32right now the now you collected
  443. 19:35information what is the frequency of
  444. 19:37occurring those faults now I need to
  445. 19:40prioritize which one is the Fault which
  446. 19:43is happening very frequently and this is
  447. 19:46parto principle 8020 rule which says
  448. 19:48that your 80% of the problems are
  449. 19:51because of 20% of the reasons and this
  450. 19:54is almost applicable in every phase
  451. 19:58everywhere
  452. 19:59maybe in your life as well you see
  453. 20:01majorly our life is affected by 20% of
  454. 20:04the
  455. 20:05decision uh your education which uh uh
  456. 20:09line you are into that will decide your
  457. 20:11total career business then uh whether
  458. 20:14you are going uh for your own venture or
  459. 20:17you are uh uh going to provide the
  460. 20:19services that is another decision second
  461. 20:22decision third who will be your life
  462. 20:24partner fourth after retirement what you
  463. 20:26will do four five decisions so that
  464. 20:29means these 20% decisions are affecting
  465. 20:31your and these are so big decisions if
  466. 20:34one goes wrong your whole life will be
  467. 20:37disturbed so that way 80% is their
  468. 20:40weightage right so same thing happens in
  469. 20:43almost every area if you talk about
  470. 20:46inventory I'm keeping inventory for any
  471. 20:48product let's say car so 20% item will
  472. 20:51be there components will be there who
  473. 20:53are carrying the maximum you know price
  474. 20:56cost and rest 80% items are are only
  475. 20:59contributing 20% so this is ABC analysis
  476. 21:02of inventory management we'll do in
  477. 21:04further sessions right so paratto
  478. 21:07diagram will histo diagram is just will
  479. 21:10arrange that these are the faults like
  480. 21:13this they will uh we can arrange in
  481. 21:15paror chart and then we can see these
  482. 21:1720% of those problems if these are the
  483. 21:21problems problem one problem two problem
  484. 21:23three problem four problem like this so
  485. 21:26these 20% of the problem which are
  486. 21:3080% customers are facing right so we can
  487. 21:34easily prioritize that now this tool is
  488. 21:36used to prioritize those issues whether
  489. 21:39the issues are mostly related with
  490. 21:40packaging or issues are mostly related
  491. 21:43with Transportation issues are mostly
  492. 21:45related with the outdated inventory
  493. 21:47because of warehouse management or maybe
  494. 21:50the outdated inventory in the warehouse
  495. 21:54right so you can just see scratched
  496. 21:58screen battery issues and missing
  497. 22:01components so if I'll just combine these
  498. 22:04three so you can see how much part these
  499. 22:07three are giving you somewhere here
  500. 22:1180% right so only these issues and uh if
  501. 22:15you'll solve these 20% issues your 80%
  502. 22:19problem will be solved right so parto
  503. 22:22chart is a very very beautiful tool to
  504. 22:25analyze the situation in that way right
  505. 22:28so others so many may be there so even
  506. 22:31if you'll try to address even then you
  507. 22:34cannot because obviously any process
  508. 22:37cannot be 100% error free so in that way
  509. 22:41you should uh Focus first on those 20%
  510. 22:44which can be you know uh addressed so
  511. 22:47scratch screen or battery issues are
  512. 22:49very prominent so immediately you can
  513. 22:52where that scratches are happening maybe
  514. 22:55in the storage or maybe when you are
  515. 22:57packaging the screens where that or
  516. 23:00maybe when you are finally you are
  517. 23:01cleaning that or maybe when you are your
  518. 23:03engineer is installing at the uh site
  519. 23:07location right then scratches are where
  520. 23:09the scratches are happening so you need
  521. 23:11to find out the reasons again you need
  522. 23:13to do the root cause analysis and the
  523. 23:15next tool will be root cause analysis
  524. 23:17only right we'll see how we'll find out
  525. 23:18the root cause so once it is done we can
  526. 23:21fix these issues and you can reduce your
  527. 23:24defects by 80% just focusing on 20% of
  528. 23:27the problems and in terms of that you
  529. 23:30can improve the customer feedback and
  530. 23:33returns will be minimized obviously
  531. 23:35right so this is how it will work now
  532. 23:37this is the fifth tool which we'll use
  533. 23:39to you
  534. 23:41know uh to find out the root cost like
  535. 23:45this is decreased customer satisfaction
  536. 23:49and maybe this is happening because of
  537. 23:51uh the scratches are happening on the
  538. 23:53screen during
  539. 23:56packaging right now now what can be the
  540. 23:59reasons let us forget this this this is
  541. 24:01fishborn diagram given by Professor
  542. 24:03Ishikawa and this is head of the fish
  543. 24:06and these are different branches you can
  544. 24:08just see like a fish it is this diagram
  545. 24:11is there so why uh like the first
  546. 24:16example if I'll go to that very basic
  547. 24:17example that problem is with packaging
  548. 24:20right this is the problem now we
  549. 24:22identified this problem can be because
  550. 24:24of the Manpower working on the
  551. 24:26workstation because of the technology we
  552. 24:28we are using on that workstation because
  553. 24:30the because of the equipment we are
  554. 24:33using to packet that because of the
  555. 24:35working conditions are not
  556. 24:40good because of the fault in the raw
  557. 24:42material because of so many other issues
  558. 24:45like so these issues we will list now if
  559. 24:48the problem is mostly happening because
  560. 24:50of Manpower we'll ask again why Manpower
  561. 24:54problem is there
  562. 24:56maybe did not undergo
  563. 24:58the proper training maybe not happy with
  564. 25:02the work environment maybe Disturbed
  565. 25:05with personal life maybe not the right
  566. 25:09skills at that job maybe related to
  567. 25:12salary maybe related to health issues so
  568. 25:16many things can be there this related to
  569. 25:19Manpower only so we identified the first
  570. 25:22reason then substages we'll find out the
  571. 25:25next stage reason then training if if he
  572. 25:29is not trained properly why that person
  573. 25:32is placed at that situation again we'll
  574. 25:34find out the reasons who can be at fault
  575. 25:37so HR team as fault maybe the placement
  576. 25:40team at fault maybe the induction people
  577. 25:43who did induction for that maybe at
  578. 25:46fault right so if it is the problem of
  579. 25:49HR how we can why that happened so HR
  580. 25:53need to change the policy so this is
  581. 25:55fishborn diagram where we'll try to find
  582. 25:57out the reasons on the further stages so
  583. 26:00that we can find out the main problem
  584. 26:03and this is also known as cause effect
  585. 26:05diagram so once you will identify the
  586. 26:07problem major categories under people
  587. 26:10problem with the process or equipment
  588. 26:12like I discussed or environment is not
  589. 26:15right then you can find out the
  590. 26:16subcategories also right and then you
  591. 26:19need to do the brainstorming session you
  592. 26:22need to ask by we usually call it fivey
  593. 26:26analysis or 3 y analysis or 7 y analysis
  594. 26:31means we'll ask why this happened seven
  595. 26:33times first we'll find out the answer
  596. 26:36then why that happened second will find
  597. 26:38out the answer then why that thing
  598. 26:39happened so we'll keep on asking the
  599. 26:42buys until until we are reaching at the
  600. 26:45root cause right so the potential causes
  601. 26:48we can identify with the help of this
  602. 26:51fish one diagram and then we need to
  603. 26:54take the corrective action additional
  604. 26:56staff we need to optimize the workflow
  605. 26:58or we need special training so obviously
  606. 27:01when we will find out the root cause so
  607. 27:04now the employe will feel motivated he
  608. 27:07will feel connected to the organization
  609. 27:09and then in that way the overall
  610. 27:11performance complaints will reduce
  611. 27:14performance will increase and in that
  612. 27:16way customer satisfaction which was the
  613. 27:18initial problem can be increased and in
  614. 27:21which will result in the ultimate
  615. 27:24customer loyality right so this is how
  616. 27:26fish diagram can help us scatter diagram
  617. 27:30again now maybe we
  618. 27:33identified uh three solutions to one
  619. 27:36problem that first I need to revise the
  620. 27:39compensation of that
  621. 27:41person then I need to provide him health
  622. 27:45insurance kind of thing I need to
  623. 27:47provide him the maybe the other housing
  624. 27:50facilities or uh maybe the education
  625. 27:54facility to the children maybe I need to
  626. 27:57uh enrich his job or enlarge his job
  627. 28:01whatever these are the three solutions
  628. 28:03you suggested to your management right
  629. 28:06now I want to track whether if I
  630. 28:08increase the compensation from point A
  631. 28:11to point B what is the
  632. 28:14performance whether the performance has
  633. 28:16increased like this like this like this
  634. 28:19or still the performance is like this
  635. 28:21right so if it is not how I can find out
  636. 28:24with the help of scatter diagram so
  637. 28:27let's go if if the problem is like this
  638. 28:29this is the solution let's say this is
  639. 28:30the solution I am implementing and this
  640. 28:33is the
  641. 28:34result I am increasing the compensation
  642. 28:39here and I'm looking for the result
  643. 28:41result in terms of number of
  644. 28:43complaints reduced number of complaints
  645. 28:46or you can say because this is
  646. 28:48positively increasing we cannot say in
  647. 28:49that way here we can say when there is
  648. 28:51negative uh correlation in this case we
  649. 28:55can say the result in terms of
  650. 28:57productivity
  651. 28:59so if I increase the compensation
  652. 29:02productivity is
  653. 29:04increased if I increase the compensation
  654. 29:07your number of complaints coming from
  655. 29:09the
  656. 29:11markets decreased so that means this
  657. 29:14component solution is working
  658. 29:17fantastically on that particular
  659. 29:19situation if the points are like
  660. 29:21staggered like this so that means there
  661. 29:23is no relationship even if you are
  662. 29:25increasing the compensation the employee
  663. 29:28is not motivated enough that he is
  664. 29:31somewhere performing of the average or
  665. 29:34whatever he was doing earlier right so
  666. 29:36this is the scatter diagram you can see
  667. 29:38number of training programs you did and
  668. 29:41job performance you can see still uh
  669. 29:44there is uh increasing Trend so that
  670. 29:46means you can suggest that training
  671. 29:49programs will help you to increase the
  672. 29:51overall
  673. 29:53performance so you can just see uh xaxis
  674. 29:58your independent variable byx is your
  675. 30:00dependent variable and regular checks
  676. 30:02you can track and you can improve the
  677. 30:04overall
  678. 30:06performance the last tool is control
  679. 30:08chart now control chart is that you are
  680. 30:11doing your process let's say at this
  681. 30:13mean this is the middle line
  682. 30:16right so you are
  683. 30:18recording your uh process at this level
  684. 30:22and how your process is moving like this
  685. 30:24so you will Define your upper limit as
  686. 30:26well upper control limit and lower
  687. 30:28control limit as long as your process is
  688. 30:32within this range right so you will say
  689. 30:35this is controlled but if it'll go
  690. 30:38beyond this range we need to stop and we
  691. 30:40need to take the corrective action right
  692. 30:43so this is control chart statistically
  693. 30:46we are this tool was given by Professor
  694. 30:49shot and uh here we are statistically
  695. 30:51controlling the quality right so how
  696. 30:53many times we are breaking the packaging
  697. 30:57how many times product wrong product
  698. 30:59delivered right so if there are this is
  699. 31:02the average and because we are allowing
  700. 31:04some defects up to some level plus minus
  701. 31:08let's say to be very specific sometime
  702. 31:10we are saying three sigma right so upper
  703. 31:13control limit lower control limit as
  704. 31:15long as you are within that range you
  705. 31:17are okay so in in when we'll discuss
  706. 31:20about the manufacturing unit
  707. 31:21specifically we'll talk about how we'll
  708. 31:24we are setting these plusus 3 uh Sigma
  709. 31:27for
  710. 31:28differentiating the assignable cause and
  711. 31:30common cause of variation right so here
  712. 31:32only as long as we are within the set
  713. 31:34limits we are okay with the quality
  714. 31:36right so we need to find out whether the
  715. 31:38common cause of variation or special
  716. 31:40cause if it is common cause we cannot
  717. 31:42remove that common cause there will be
  718. 31:45small variation right so that we cannot
  719. 31:48that is sometimes uh because of
  720. 31:51environmental condition sometimes
  721. 31:52because human intervention is there
  722. 31:54human it's not completely automated
  723. 31:56right even automation is there after
  724. 31:58some time maybe be and tear so we are
  725. 32:00not getting the exactly same parameters
  726. 32:03so parameters keep on changing so this
  727. 32:06we cannot remove but special cause if
  728. 32:09something the big problem is happening
  729. 32:12then we need to take the corrective
  730. 32:13action right so we need to identify
  731. 32:16whether the cause is special cause or
  732. 32:18common
  733. 32:20cause so you can see once we'll
  734. 32:23Implement these control charts we can
  735. 32:26reduce the variation in the quality of
  736. 32:29the products delivered this is how the
  737. 32:31complete all the tools can be identified
  738. 32:34I have discussed flow chart then you
  739. 32:37want to see the big picture how things
  740. 32:38are happening check sheets are used for
  741. 32:40data collection these all tools are used
  742. 32:42for data analysis here you will record
  743. 32:44the errors how frequently they are
  744. 32:46happening scatter diagram how uh results
  745. 32:50if you'll Implement some solutions how
  746. 32:52the results are improving you can use
  747. 32:54control charts to be within the range
  748. 32:57then problem identification you can do
  749. 33:00fish one analysis cause and effect
  750. 33:02diagram and in the end you can
  751. 33:03prioritize the solution as well for the
  752. 33:05same problem if you are finding two
  753. 33:07three solutions so that those Solutions
  754. 33:09also you can prioritize so another
  755. 33:11approach is quality Circle this is
  756. 33:13voluntarily group and not very formal
  757. 33:16right so maybe 8 to 10 peoples are part
  758. 33:19of that voluntarily group and they are
  759. 33:22discussing on some issue let's say the
  760. 33:24issue like we talked about related to
  761. 33:27Packaging
  762. 33:28so they will maybe voluntarily people
  763. 33:30one or two person will come from
  764. 33:32production Department one or two people
  765. 33:34will come from quality Department
  766. 33:36voluntarily one or two people will come
  767. 33:39from R&D Department from maintenance
  768. 33:42department from training and development
  769. 33:45department like this right so who are
  770. 33:48directly indirectly are linked with that
  771. 33:50particular problem now they will meet
  772. 33:53regularly okay this is a kind of quality
  773. 33:55Circle they will meet regularly they
  774. 33:58will find out the solution do the
  775. 34:00brainstorming sessions we'll come up
  776. 34:02with the results right so uh and then
  777. 34:05we'll suggest those results to the uh
  778. 34:08higher management now if it is related
  779. 34:10to packaging let's say packaging we need
  780. 34:13to change the raw material right so this
  781. 34:16can be one of the suggestion so R&D
  782. 34:18people will also say about raw material
  783. 34:20how we can improve in a better B right
  784. 34:23then quality people will also say
  785. 34:25whether the quality will be improved or
  786. 34:27if you are changing changing the raw
  787. 34:28material it will degrade the quality
  788. 34:30further right then so all will check the
  789. 34:33feasibility even accounting department
  790. 34:35will be there with their accounts that
  791. 34:37this will add the cost further we cannot
  792. 34:39afford that like these many arguments
  793. 34:42can be there so in the end you all the
  794. 34:45members uh what are the members there is
  795. 34:48top management their role is to support
  796. 34:51the QC right whatever suggestion they
  797. 34:54are giving they need to sanction the
  798. 34:56budget to implement those Solutions so
  799. 34:58that they can feel uh you know motivated
  800. 35:02they should provide the award kind of
  801. 35:03system and uh there if their uh
  802. 35:07suggestions are being implemented so
  803. 35:09next time they will also be willing to
  804. 35:11you know meet on these kind of informal
  805. 35:14teams as a informal teams and then they
  806. 35:16will try to solve so many in in
  807. 35:18manufacturing units these these kind of
  808. 35:20groups are very very common right then
  809. 35:23steer Committee of maybe senior people
  810. 35:25will be there who will be you know
  811. 35:27evaluating those quality Circle whe
  812. 35:29whether really that quality circle is
  813. 35:31required for that particular problem or
  814. 35:33not what are the objectives whether they
  815. 35:35are within the guidelines of broader
  816. 35:37guidelines of the organization or they
  817. 35:39are giving some out out of the box
  818. 35:41suggestion which suggestion is okay we
  819. 35:43can Implement can reduce the problem
  820. 35:46drastically but then what about the cost
  821. 35:49what about the other ethical constraints
  822. 35:51what about other legal constraints
  823. 35:53whether we can go for that or not right
  824. 35:55there is coordinator who who will will
  825. 35:57be coordinating between quality Circle
  826. 36:00higher management whatever suggestion
  827. 36:01they will give they will give that
  828. 36:03person is going to coordinate with them
  829. 36:05and will keep the track of activities
  830. 36:08whatever they are doing okay then there
  831. 36:10is
  832. 36:11facilitator the he will be the senior
  833. 36:14officer of the department and uh uh he
  834. 36:17will be uh arranging all the necessary
  835. 36:20you know training programs and uh he
  836. 36:22will develop the set up the links
  837. 36:24between the quality circles and my
  838. 36:26management and will ensure the
  839. 36:27participative culture so this is the
  840. 36:29main role of facil facilitator leader
  841. 36:33obviously uh will be one person who will
  842. 36:35be leading that team will be defining
  843. 36:37the problem various aspects of that uh
  844. 36:40that problem what can be you know the
  845. 36:43redressal schemes so in that way he's
  846. 36:46going to elaborate with the team and
  847. 36:48obviously with the team members who are
  848. 36:50the ultimate stakeholders coming up with
  849. 36:53the suggestions brainstorming sessions
  850. 36:55giving up their feedbacks and then the
  851. 36:57leader will combine that and obviously
  852. 36:59that cross questioning and all those
  853. 37:02things will be there so that we can
  854. 37:03validate the solution in the end whether
  855. 37:05we can really go for those Solutions or
  856. 37:08not so the fourth tool is 5S philosophy
  857. 37:12which is Japanese ter Ser C cisu and we
  858. 37:16can Implement for housekeeping so that
  859. 37:20uh the inventory can be managed within
  860. 37:22the warehouse in a proper way and we can
  861. 37:25sustain that proper way the first first
  862. 37:27is sorting you should sort your material
  863. 37:30because sorting is very much required in
  864. 37:32Warehouse where you need to sometimes
  865. 37:34you are sorting pin code buys sometimes
  866. 37:36you are sorting product wise sometimes
  867. 37:38you are sorting as per the requirements
  868. 37:40of the product right Cold Storage
  869. 37:42products will be stored in that area and
  870. 37:45rest of the products will be stored
  871. 37:46delicate items how you should handle
  872. 37:48where you should store those items right
  873. 37:50so how you are designing the Shelf space
  874. 37:52and all that set in order you need to uh
  875. 37:56set in order all the it Ms as per size
  876. 37:58as per uses or as per product nature
  877. 38:01shine you need to maintain uh the
  878. 38:04cleanliness of the workplace so that uh
  879. 38:07smooth function can be ensured and
  880. 38:09accidents can be reduced standardize
  881. 38:12once it is done you need to standardize
  882. 38:14the process so that repetitively you
  883. 38:17should be able to do that it's not one
  884. 38:19day you are setting in order and next
  885. 38:21day everything is again on the back
  886. 38:24track Q are so sustaining once the
  887. 38:26system is standardized you need to
  888. 38:28sustain that for forever right so this
  889. 38:31is how this approach of housekeeping can
  890. 38:33be very helpful when we are managing our
  891. 38:36inventory within the
  892. 38:38warehouses so the last one is
  893. 38:40benchmarking like I told you
  894. 38:43so you decided your kpis then these kpis
  895. 38:49you will find out uh the kpi of the best
  896. 38:54player in the market and find out the
  897. 38:58gaps between you there is one approach
  898. 39:00of balance scorecard we'll try to cover
  899. 39:03that as well with the respect to I'll
  900. 39:06try to design with respect to the supply
  901. 39:08chain Logistics management so this is
  902. 39:11one approach how you can uh you know uh
  903. 39:14identify the gaps and uh this is one
  904. 39:18concept of House of
  905. 39:21quality these two things we will go
  906. 39:25for right house of quality where you
  907. 39:27will identify your present situation
  908. 39:30where the best player Benchmark is so
  909. 39:33that you can find out the gaps right and
  910. 39:35best practices so that it will provide
  911. 39:37you the opportunities right so where you
  912. 39:40are lagging how you can improve your
  913. 39:42performance Matrix how why you are late
  914. 39:45than others right so your delivery is
  915. 39:47delayed why wrong product are shipped so
  916. 39:50frequently on your uh platform why that
  917. 39:54is happening why you are always shortage
  918. 39:56of inventory why there is defected
  919. 39:59product is uh shipped to the customer so
  920. 40:01there is something wrong with the career
  921. 40:03partner right so to define the
  922. 40:05benchmarking we have six steps first of
  923. 40:08all you need to define the objective so
  924. 40:11what are the area where you want to
  925. 40:14improve you will keep those as objective
  926. 40:16then you will identify those kpis let's
  927. 40:19first uh improve our uh uh
  928. 40:22Transportation sector so because
  929. 40:25transportation is uh cont contributing
  930. 40:2760 to 70% of the cost let's say so we
  931. 40:30need to improve that part right then
  932. 40:33gathered data what are Transportation
  933. 40:35related kpis what are our
  934. 40:39situation and what is the situation of
  935. 40:42the leader in that industry if DHL you
  936. 40:45are comparing delivery you are comparing
  937. 40:48so what is the situation of those player
  938. 40:50right as far as those kpis are concerned
  939. 40:54then you need to select the partner
  940. 40:56right so you need to exchange the
  941. 40:58information with your career Partners
  942. 41:00where we can work Logistics partner or
  943. 41:03Transportation Partners where we can
  944. 41:05improve and then again after Improvement
  945. 41:07you will analyze the data compare the
  946. 41:09data whether you have made the sign
  947. 41:11significant Improvement is there or not
  948. 41:14right so that you need to see again you
  949. 41:16will identify the opportunity that you
  950. 41:18have addressed the problem up to 30% but
  951. 41:21still you need to go further let's say
  952. 41:23take the next step which will maybe will
  953. 41:26uh again improve the situation by 50%
  954. 41:28and we can cut down the complaints by
  955. 41:30another 50% so these all are the uh uh
  956. 41:35tools we can use uh obviously uh we'll
  957. 41:38discuss some tools in uh Supply Chain
  958. 41:40management as well so there we will be
  959. 41:42covering the broader perspective so we
  960. 41:45can conclude that as customer focus so
  961. 41:49goal is to provide the best quality
  962. 41:51product delivered at at best experience
  963. 41:54that will only happen when we'll set up
  964. 41:56all of C these kpis in order right and
  965. 41:59we need to shine these kpis every day so
  966. 42:02that we can sustain these for a longer
  967. 42:04period there should be environment of
  968. 42:06continuous Improvement that plan do
  969. 42:08check act cycle should be continuous
  970. 42:11right employee
  971. 42:12empowerment QC circles employees should
  972. 42:16be part of that and if I'm addressing
  973. 42:18some problem of maybe my organization
  974. 42:20and I'm acknowledge in that way I'll
  975. 42:22feel motivated always people will come
  976. 42:25with their suggestions how they can and
  977. 42:26you be believe me in manufacturing
  978. 42:28industry major major problems are solved
  979. 42:31by those illiterate people who are
  980. 42:32working on the production line because
  981. 42:34they are continuously day and night
  982. 42:36doing the same repetitive action no one
  983. 42:39can understand better than them because
  984. 42:41they are continuously if you are
  985. 42:43producing daily 10,000 di times 10,000
  986. 42:46time they are doing the same operation
  987. 42:48so you can just imagine how efficient
  988. 42:50and in that way they can be
  989. 42:52knowledgeable in that way use of quality
  990. 42:55tools so you need to overnight you
  991. 42:58cannot use these tools you need to
  992. 43:00prepare your team who who can be very
  993. 43:03good in collecting data analyzing the
  994. 43:05problem and coming up with the solutions
  995. 43:08and then also prioritizing the solution
  996. 43:10which solution we can go for uh you know
  997. 43:12first phase second phase third phase
  998. 43:14product design within the product we
  999. 43:16should meet the customer expectation and
  1000. 43:19you should design your process like that
  1001. 43:22your process is not damaging the
  1002. 43:26packaging
  1003. 43:27right your process is not uh doing all
  1004. 43:30the that uh screen scratches right so
  1005. 43:33your process is should be your process
  1006. 43:36should be defect free and then obviously
  1007. 43:39supplier role is important how you can
  1008. 43:42control the quality at the supplier end
  1009. 43:44so you need to align all these players
  1010. 43:47everywhere you need to go for the
  1011. 43:49quality
  1012. 43:51tools whatever we discussed and only
  1013. 43:53then you can improve the overall
  1014. 43:55performance so this these all are the
  1015. 43:59references other than the books referred
  1016. 44:01in first few sessions so that's all from
  1017. 44:04my side thank you very much

About this transcript

This page contains the full transcript of Lecture 11 : Tools for Improving Logistics Efficiency (Contd.) by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 6,953 words across 1,017 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.