  1. 0:01[Music]
  2. 0:22[Music]
  3. 0:26so hello dear friends welcome back to
  4. 0:28nptl online course on Logistics and
  5. 0:30Supply Chain management I'm Dr vikas
  6. 0:33takur assistant professor Department of
  7. 0:35humanities and social sciences IIT kakur
  8. 0:38so in the last session we discussed
  9. 0:40about the key performance indicators in
  10. 0:43logistics function right so what are
  11. 0:46those parameters uh any organization
  12. 0:48working in this area and or delivering
  13. 0:52product or services at your doorstep
  14. 0:54must look on those uh parameters or
  15. 0:57maybe must try to follow the best
  16. 1:00practices in that industry keeping them
  17. 1:02as Benchmark and then we have explored
  18. 1:06all the functional areas in logistics
  19. 1:09like uh transportation we discussed
  20. 1:11about we discussed about warehousing we
  21. 1:13discussed about Supply we discussed
  22. 1:16about distribution performance
  23. 1:18indicators and then we discussed about
  24. 1:20the overall supply chain or Logistics
  25. 1:22performance indicators right so now in
  26. 1:25this session it is very important now to
  27. 1:28uh find out some tools which can help
  28. 1:32you to you know improve those
  29. 1:35performance indicators right if you are
  30. 1:37lacking somewhere how we can improve
  31. 1:39those indicators so in this session
  32. 1:41particularly we are going to cover right
  33. 1:44so I have picked some uh very famous
  34. 1:47tools we are using in operation
  35. 1:49management and uh I have tried to use
  36. 1:52those tools uh in improving the
  37. 1:55logistics management performance right
  38. 1:57so very first is plan do check at cycle
  39. 2:00which we'll see what are those different
  40. 2:02stages right and then very famous 7 QC
  41. 2:06tools we will use quality control tools
  42. 2:09how we can improve the quality of
  43. 2:12shipping the product packaging the right
  44. 2:14product and right packaging also right
  45. 2:18and then delivery on time and then
  46. 2:21accurate delivery right so these these
  47. 2:25all things whatever kpis we discussed
  48. 2:27we'll try to you know manage those AP uh
  49. 2:30using these uh some of the approaches
  50. 2:33right and then uh famous framework is
  51. 2:36quality Circle then we'll discuss about
  52. 2:39how we can Benchmark the best practices
  53. 2:41uh in this industry and then finally
  54. 2:43we'll be concluding up with the uh you
  55. 2:46know how we can improve the overall
  56. 2:48performance or the if we'll talk about
  57. 2:50the total quality of this complete
  58. 2:53Logistics uh Network right so we may
  59. 2:56spend couple of session on uh discussing
  60. 2:59these techniques
  61. 3:00so just go through the quick
  62. 3:03introduction so quality is basically uh
  63. 3:07there are two different definitions one
  64. 3:10is for the customer other one is for the
  65. 3:13product supplier the manufacturer who is
  66. 3:16offering the product to the market right
  67. 3:19so we'll go through these two different
  68. 3:21concepts right so quality control is a
  69. 3:24crucial aspect of logistics management
  70. 3:26to ensure that product reach the
  71. 3:29customers end with specified standards
  72. 3:31and quality right so if you are
  73. 3:35receiving any package at your doorstep
  74. 3:37and then if you did not even open that
  75. 3:40packet and that is damaged so this is
  76. 3:42something will give you you know very
  77. 3:45bad impression uh to the customer and
  78. 3:48that brand image will be hampered if we
  79. 3:49are you know we cannot afford on uh
  80. 3:52ordering maybe kind of delicate products
  81. 3:55using those corer Services because they
  82. 3:57never care about your packet right right
  83. 4:00so that kind of perception comes in your
  84. 4:02mind and when you see okay we'll buy
  85. 4:05these kind of products so we'll not buy
  86. 4:07through online platform we'll go
  87. 4:09physically we'll check and then we'll
  88. 4:11get it home delivered with proper care
  89. 4:14right so that should not happen so only
  90. 4:17that that will happen only when we are
  91. 4:19taking care of those specified standards
  92. 4:22and quality right so obviously we'll
  93. 4:25talk about these quality measures in
  94. 4:27transportation warehousing inventory
  95. 4:29management Material Handling and
  96. 4:32packaging so quality assurance is a
  97. 4:36procedure to ensure quality of products
  98. 4:39or Services by preventing mistakes and
  99. 4:42defects right in the products and when
  100. 4:45we are talking about the logistics so
  101. 4:47obviously because manufacturing right
  102. 4:49now we are not considering as part of it
  103. 4:51when we'll talk about complete supply
  104. 4:53chain obviously manufacturing will also
  105. 4:55part the part of that right but right
  106. 4:57now let's focus only on the correct
  107. 5:00deliveries uh to the End customer in the
  108. 5:03the product should reach in the right
  109. 5:05shape right so when we Define quality we
  110. 5:09can Define fit for purpose right first
  111. 5:11time fit for purpose means for whatever
  112. 5:14purpose it is intended it should fit
  113. 5:17right you it should be readily usable
  114. 5:20right so your distribution Network
  115. 5:22should uh provide the delivery in such a
  116. 5:26way that once it is reaching at your
  117. 5:28home you are getting that product you
  118. 5:30can plug and play kind of system should
  119. 5:32be there right first time that there
  120. 5:35should not be any chance of mistake
  121. 5:38right in that so you should be very
  122. 5:40right in the very first time you cannot
  123. 5:42just ring the bell of the uh door of
  124. 5:45someone else and then you are saying oh
  125. 5:47sorry this is not yours order I
  126. 5:49mistakenly I have uh uh just click
  127. 5:53knocked your door wrongly right so that
  128. 5:55cannot happen so you have to be correct
  129. 5:57in the very first time so just going
  130. 6:00through what is the concept of quality I
  131. 6:02told you there are two different
  132. 6:04perspectives producer perspective and
  133. 6:06customer perspective producer
  134. 6:08perspective their main focus is on
  135. 6:12conformance to specifications right so
  136. 6:16if I'm saying that you are designing
  137. 6:18your packaging and your packaging should
  138. 6:21be ready to Bear all the beer and tier
  139. 6:24through the transportation Network when
  140. 6:26we are transporting that product it
  141. 6:28should be ready so maybe we are checking
  142. 6:30the strength of that packaging how
  143. 6:32strong that package is so that if that
  144. 6:35beer and tier happens during the
  145. 6:37transportation right so whether our
  146. 6:39product will be safer in that or not so
  147. 6:42that means you might be having some
  148. 6:44specification related to the strength of
  149. 6:46that okay so same way we are defining
  150. 6:49the strength of uh we are defining the
  151. 6:52parameters in terms of that we can say
  152. 6:54we are defining the
  153. 6:56parameters right and in par whenever we
  154. 7:00are defining parameters we are defining
  155. 7:02a proper range up to what they can ex
  156. 7:06means uh uh go left or right and still
  157. 7:10they are within control we'll consider
  158. 7:11it that they are within control so that
  159. 7:13range we are defining right so
  160. 7:16conformance to specification you are
  161. 7:18meeting the predefined specification
  162. 7:22that means you are meeting the quality
  163. 7:24standards then at what cost you are
  164. 7:28meeting those quality standards will
  165. 7:29Define your cost function and obviously
  166. 7:32will affect your price and obviously
  167. 7:34will affect your profit and margins as
  168. 7:37well right now if you look on the other
  169. 7:41way the consumer perspective to whom you
  170. 7:44are making the end delivery so they are
  171. 7:46obviously they are not worried about the
  172. 7:49specification whatever specification you
  173. 7:51are taking whatever strength you are
  174. 7:53checking of the box right whatever
  175. 7:55quality parameters testing you are doing
  176. 7:57with your final product but when it is
  177. 8:00reaching at my home I'll just check
  178. 8:02whether the packet is okay or not
  179. 8:04whether the product is functioning or
  180. 8:06not whether the safety parameters are
  181. 8:09okay or not so that means whatever
  182. 8:11quality characteristics you you are
  183. 8:14promising in the market I'll check for
  184. 8:16those quality characteristics I'll check
  185. 8:18the functionality I'll not go for what
  186. 8:21parameter you have designed right or
  187. 8:24behind the window whatever is happening
  188. 8:26maybe uh your uh if you're talking about
  189. 8:29home appliances so what capacity you are
  190. 8:32picking for picking the electronic
  191. 8:34components or how you are improving
  192. 8:36whether it is three star AC four star
  193. 8:37five star whatever it is aluminium Bing
  194. 8:40copper winding I have nothing to do with
  195. 8:42that only thing is if you are saying
  196. 8:44that it is five star rating and will
  197. 8:46help you to reduce your electricity bill
  198. 8:49and will ensure the you know in with
  199. 8:52inverter technology will ensure the
  200. 8:53proper cooling that is the promise from
  201. 8:56your side to means very common customer
  202. 8:59and I will be looking for that so once
  203. 9:01it is plugged so I should be easily in
  204. 9:05in a condition to play that right so
  205. 9:07Fitness for use this is how we can
  206. 9:09Define the quality for these two
  207. 9:11different stakeholders in that
  208. 9:12distribution Network one is who is
  209. 9:15providing the products or Services other
  210. 9:17one is who is receiving the products and
  211. 9:19services meaning for Quality meaning of
  212. 9:22quality for these two different
  213. 9:23stakeholders are different in that
  214. 9:26way now when we are ensuring the quality
  215. 9:30there are two things two types of cost
  216. 9:33right one is cost of conformance and
  217. 9:35then is non-conformance let's say if you
  218. 9:38are saying that your product is a
  219. 9:40quality product or you are saying that
  220. 9:42your delivery let's say we specific in
  221. 9:45logistics the delivery is always on time
  222. 9:49and you are getting always the right
  223. 9:56product or the address is always right
  224. 10:00right so packaging is always up to the
  225. 10:04mark right so these
  226. 10:07are the promises now quality means that
  227. 10:10I'm getting all these promises right so
  228. 10:13to ensure this that product is reaching
  229. 10:16in right quantity right quality or
  230. 10:19variety or whatever color you picked
  231. 10:21whatever stuff is inside that if I'm
  232. 10:24receiving that that means you are
  233. 10:26conforming to those standards so for
  234. 10:28ensuring that that obviously I will be
  235. 10:31doing all the quality
  236. 10:34checks when I'm doing all the quality
  237. 10:36checks obviously there will be one team
  238. 10:40who will be doing that there will be
  239. 10:42some
  240. 10:43equipments we are using to ensure the
  241. 10:46quality there will be some facilities we
  242. 10:49are using to sort the products we are
  243. 10:52using to pack the product and labeling
  244. 10:55those product write addresses on those
  245. 10:57product so that it should reach to right
  246. 10:59customer all this will carry the cost
  247. 11:03right this is your cost of conformance
  248. 11:06providing the right product we are doing
  249. 11:09so many supporting uh activities so that
  250. 11:12the right product delivery can be ured
  251. 11:15right in that way this is the direct
  252. 11:17cost the indirect cost is quality
  253. 11:20training when I'm saying that one team
  254. 11:22is working who is taking care of the
  255. 11:24packaging one team is working who is
  256. 11:26taking care in the warehouse handling
  257. 11:29one team is totally dedicated on
  258. 11:31Transportation Network designing and
  259. 11:33then rooting and then delivery and then
  260. 11:35everything right whatever functions are
  261. 11:37in logistics management so to uh ensure
  262. 11:41the quality throughout the channel we
  263. 11:43need to train our people it's not that
  264. 11:46that distribution is just anyone can
  265. 11:48enter into this and can do that Duty
  266. 11:50right we discussed about that we need
  267. 11:53skilled people in the transportation
  268. 11:55Logistics industry who can pack the
  269. 11:57product in the right way and and uh who
  270. 11:59are professional in packaging right so
  271. 12:02that training will also add some cost in
  272. 12:06that we are doing some studies some
  273. 12:09surveys whether the quality is met or
  274. 12:12not that will also add cost into this
  275. 12:15this is cost to the Quality right so we
  276. 12:20usually say quality is
  277. 12:22free this is very important statement
  278. 12:26quality is free but when you check this
  279. 12:29the quality is not free we'll prove this
  280. 12:31how this is free so there is cost of
  281. 12:34ensuring the quality you are doing a
  282. 12:35regular checkup your team is working on
  283. 12:37that equipments are working on that
  284. 12:39right and then you are ensuring the
  285. 12:40quality you are doing surveys studies to
  286. 12:43find out is there any problem sampling
  287. 12:45based you are picking the products and
  288. 12:46then finding out okay the package is
  289. 12:48delivered on time in right condition to
  290. 12:51the right customer address was right all
  291. 12:54those things you are doing right this is
  292. 12:56carrying certain cost so this is the
  293. 12:58cost cost of the quality then cost of
  294. 13:01non-conformance let's say if we are not
  295. 13:03doing that randomly we are peing so what
  296. 13:06will happen we'll do the wrong
  297. 13:10delivery we'll ship the wrong
  298. 13:16product we'll ship obviously product and
  299. 13:19then quality will be in
  300. 13:23problem right so you might have seen
  301. 13:26certain ads or something maybe in the
  302. 13:28social media that you are ordering phone
  303. 13:30through your e-commerce website and then
  304. 13:32in the end you got something else uh
  305. 13:36maybe bathing soap or maybe some other
  306. 13:38salt packet or something like that right
  307. 13:40this usually uh sometimes this happens
  308. 13:43so that means so many things can happen
  309. 13:47when you are not meeting all those
  310. 13:50standards so one thing is order will be
  311. 13:54coming back rejected another thing is if
  312. 13:58that product is wrong so that will be a
  313. 14:00kind of scrap for you and sometimes
  314. 14:03items are so if you will again pick
  315. 14:06those items those are kind of maybe uh
  316. 14:09fasile items if you'll pick those items
  317. 14:12again will uh you know come with your to
  318. 14:14your uh Distribution Center that you may
  319. 14:18break those items sometimes so you are
  320. 14:20leaving with the customer only and even
  321. 14:22you are giving them refund if it is
  322. 14:25damaged during shipment then you have to
  323. 14:27do the rework you under warranty period
  324. 14:30your engineer will be visiting the site
  325. 14:33and then we replace the components free
  326. 14:35of cost so you just see this is the
  327. 14:39indirect cost that is coming to your
  328. 14:43company if you are not shipping your
  329. 14:46product in a right way so if I equate
  330. 14:50this cost with this cost so if you are
  331. 14:53ensuring the quality this all will not
  332. 14:55happen right nothing is coming back from
  333. 14:59the customer so whatever you are
  334. 15:02delivering the right product damaged
  335. 15:04product I told you the Share is around
  336. 15:06around 25 to 30% because we are damaging
  337. 15:09when we are delivering the product so
  338. 15:10that is direct cost to the custom and
  339. 15:13that is one direct cost indirect cost is
  340. 15:16my brand image is also hampered now
  341. 15:19customer will never prefer my website or
  342. 15:21I told you one survey where 80 or 85%
  343. 15:24customers who had any prior bad
  344. 15:27experience uh with e-commerce player
  345. 15:30related to anything delivery payment or
  346. 15:32anything right they they then you know
  347. 15:35try to avoid going uh for those uh
  348. 15:38e-commerce websites and they want to you
  349. 15:40know they they actually prefer then
  350. 15:42going physically and check the product
  351. 15:44so these are the cost when we are saying
  352. 15:47so in the end if we get that if we are
  353. 15:50ensuring the quality and maintaining
  354. 15:52that brand image we can say that quality
  355. 15:54is free right you can overcome these uh
  356. 15:58costs
  357. 16:00so
  358. 16:02uh let's take very simple example and
  359. 16:05we'll see why these you know surveys or
  360. 16:10research are required to identify the
  361. 16:12fals and then what we'll do with when
  362. 16:15we'll identify the fults let's say a
  363. 16:17very simple example there is some uh
  364. 16:21there are so many stages one is is your
  365. 16:24packaging packaging is happening at one
  366. 16:26stage let's say in three shift
  367. 16:31uh three different people are working
  368. 16:33let's keep it very simple three people
  369. 16:35different people are working right shift
  370. 16:37a b c now I can see I'm analyzing that
  371. 16:42usually there are some fults or errors
  372. 16:46when we are doing the packaging what can
  373. 16:48be errors when we are doing the
  374. 16:50packaging maybe you you did not uh that
  375. 16:54packaging is
  376. 16:55damaged and you did not check it and you
  377. 16:59packed still you packed in that then you
  378. 17:01packed the wrong
  379. 17:05product then what can be there you
  380. 17:08forgot to put the accessories in that
  381. 17:10let's say you are packing the mobile and
  382. 17:13charger is missing or sometimes you did
  383. 17:16not put the manual
  384. 17:19instructions right instruction manual
  385. 17:22inside that packaging so these are some
  386. 17:24of the common mistakes errors you can do
  387. 17:27when you are doing the packaging there
  388. 17:28can be so many others right
  389. 17:31so now three different people are
  390. 17:33working now many complaints are coming
  391. 17:37from the markets let's say that there
  392. 17:39are issues with the packaging so I need
  393. 17:42to find out first issue with the
  394. 17:44packaging what type of issues let's say
  395. 17:46um this is 1 2 3 4 these four things are
  396. 17:51there let's say I'll just analyze first
  397. 17:54problem how many time it is occurring 15
  398. 17:57times second problem 20 times third
  399. 18:00problem 10 times fourth problem five
  400. 18:03times so now I can find out that the
  401. 18:07second
  402. 18:08problem is the highest right highest
  403. 18:11frequency 20 times and what is that
  404. 18:13problem wrong product packed so per the
  405. 18:17person whosoever is working on that he
  406. 18:19is packing the wrong product right so
  407. 18:21now I identified the problem and then
  408. 18:24obviously next important problem is once
  409. 18:27we'll uh solve that problem the next is
  410. 18:30packaging damaged why packaging is
  411. 18:32damaged now for these kind of uh
  412. 18:36problems obviously the person who is
  413. 18:38working on that is responsible he did
  414. 18:41not check the packaging or and obviously
  415. 18:44the person the vendor who is providing
  416. 18:46you the packaging material as well is a
  417. 18:47responsible but the first stage here is
  418. 18:50the packaging the person who is working
  419. 18:51on that stage now I need to identify
  420. 18:54whether this problem is the first person
  421. 18:57second person or third person where are
  422. 18:59the maximum counts coming the complaints
  423. 19:02are coming who was the person operator
  424. 19:05sitting on that stage and was handling
  425. 19:07these activities right so I identified
  426. 19:12the uh shift
  427. 19:15operator who is doing
  428. 19:17that I identified the problems I
  429. 19:20identify I I now prioritize all the
  430. 19:24problems and I found that second problem
  431. 19:27is the most prioritized we need to to CH
  432. 19:29uh take the quick action so let's now
  433. 19:31find out problem is diagnosed now now we
  434. 19:34need to find out the solution so now
  435. 19:36let's move towards the solution shift
  436. 19:38operator who is the shift operator let's
  437. 19:40say the problem is with the second
  438. 19:42person and we are getting the maximum
  439. 19:44complaints the with the products which
  440. 19:47are packed during his uh period right
  441. 19:51now what is the problem with the person
  442. 19:55so maybe now there can be so many
  443. 19:57problems whether the
  444. 19:59he is not
  445. 20:00happy with the job he's not happy with
  446. 20:04the company
  447. 20:07management he is not happy with the
  448. 20:09compensation in terms of the salary he
  449. 20:11is getting in terms of the medical
  450. 20:13things he's getting in terms of the
  451. 20:14other hospitalities whatever he is
  452. 20:16getting maybe he's not finding his
  453. 20:18passion in that job maybe his skills are
  454. 20:21not aligned in that job right these can
  455. 20:25be the reasons okay so many other
  456. 20:27reasons maybe he is Disturbed why he is
  457. 20:31Disturbed again maybe personal life he
  458. 20:34is Disturbed maybe professional life he
  459. 20:36is Disturbed right why professional life
  460. 20:39again we need to ask these questions so
  461. 20:41that we can find out the root cause this
  462. 20:43is the another step where we will find
  463. 20:45out why that uh wrong product is being
  464. 20:49shipped because the person is Disturbed
  465. 20:52professionally let's say person is uh
  466. 20:56Disturbed professionally because he is
  467. 20:57not finding
  468. 20:59passion in that job or his skills are
  469. 21:02not aligned that
  470. 21:03means he was capable of doing something
  471. 21:07maybe something else but we deployed
  472. 21:09that Manpower on that workstation where
  473. 21:10is the problem problem is with the
  474. 21:13placement of that
  475. 21:15person who is doing the placement HR
  476. 21:18team
  477. 21:19is doing conducting the interviews and
  478. 21:23in the interview only when they are
  479. 21:25going for selection there only they need
  480. 21:28to
  481. 21:29identify the placement as well that this
  482. 21:33person is capable of quality this person
  483. 21:37in in the quality Department this person
  484. 21:39is capable of doing the production kind
  485. 21:41of things this person is capable of
  486. 21:43doing the R&D kind of things or this is
  487. 21:45capable of marketing the product or what
  488. 21:48kind of things he can do right so you
  489. 21:52can just see with one problem how we can
  490. 21:55identif first we need to diagnose the
  491. 21:57problem what are the reasons
  492. 21:59we need to find out we need to
  493. 22:00prioritize the reason we need to hand we
  494. 22:03need to go to the root cause so this
  495. 22:05these all tools somehow are interl and
  496. 22:09then we can diagnose a particular
  497. 22:10situation and we can find out the
  498. 22:13solution so we'll go through these tools
  499. 22:15one by one so just see how through
  500. 22:17automation they have improved their key
  501. 22:20performance indicators so this is little
  502. 22:22longer video but it is worth watching
  503. 22:25we'll give you the complete picture of
  504. 22:26the performance indicators you you guys
  505. 22:28can just quickly go through these videos
  506. 22:31and then we'll uh continue our uh
  507. 22:33discussion on the topic so yes so you
  508. 22:36can just see this is not a small thing
  509. 22:39that
  510. 22:4140,000 items 40,000 items per hour they
  511. 22:46are handling through their automated
  512. 22:49machines and then if you see 11,000
  513. 22:53plus facilities they are injecting with
  514. 22:56their packages right so how how
  515. 22:58beautifully DHL is doing that using
  516. 23:01automation if you talk about the
  517. 23:03indicators performance indicators you
  518. 23:06can just imagine how how much they are
  519. 23:09spending on one order if they are
  520. 23:10handling 40,000 orders packeted uh
  521. 23:14packages in 1 hour right so then if you
  522. 23:18are talking about at that level so
  523. 23:20obviously you cannot uh uh say that
  524. 23:24errors can happen at any time so there
  525. 23:27cannot be any excuse so whether uh it is
  526. 23:30completely automated plant or you are
  527. 23:33doing with your human intervention
  528. 23:35whatever it is right but in the end uh
  529. 23:39you cannot uh just uh be efficient just
  530. 23:43by promising your quality right so these
  531. 23:46are some of the tools down the line
  532. 23:47we'll discuss uh uh plan and do check
  533. 23:51act right so 7 QC tools quality Circle
  534. 23:545S approach how it will help us to
  535. 23:56improve that and then benchmarking going
  536. 23:58to the very first
  537. 24:00is so this was obviously four step this
  538. 24:04is known as wheel also plan do check act
  539. 24:07wheel right so we'll how we'll do that
  540. 24:10we'll first plan then we'll implement it
  541. 24:13then we'll check the results and then
  542. 24:17we'll act accordingly if it is okay
  543. 24:19results are okay we'll standardize those
  544. 24:21things and if it is not okay again we'll
  545. 24:25go for the next phase planning and then
  546. 24:27we'll uh do the modifications depending
  547. 24:30upon the feedback and then again we'll
  548. 24:32implement this circle will keep on going
  549. 24:34until that problem specific problem is
  550. 24:37resolved then we'll go for the next
  551. 24:40problem and we'll again we'll go with
  552. 24:42this wheel was this approach was given
  553. 24:44by uh Dr William Edwards Deming so
  554. 24:48obviously uh the main uh uh Walter
  555. 24:51shivat has uh uh is known as quality
  556. 24:55Guru as well and uh his contribut in
  557. 24:59that his Pioneer in that field right so
  558. 25:02even W adwards Deming as well so in
  559. 25:05Japan I think there is there are prizes
  560. 25:08against their name you Deming price for
  561. 25:11Quality so this is how those people are
  562. 25:14in that industry
  563. 25:16so very first is plan in in the plan
  564. 25:20phase you need to define the objective
  565. 25:22right so what is the objective like I
  566. 25:24told you in uh first you need to
  567. 25:27identify the problem what what is the
  568. 25:28pro problem right now let's say we
  569. 25:30discussed in the example that it is
  570. 25:33problem is related to packaging right so
  571. 25:35how we can improve the packaging if that
  572. 25:38is not fault of the packaging and is the
  573. 25:41fault of the person who is actually
  574. 25:43working on that stage then we need to
  575. 25:46change the plan right so we need to work
  576. 25:48with that person if he is not happy with
  577. 25:51that work or if he's not happy with the
  578. 25:54compensation policy or the all those
  579. 25:57things we discussed right then we need
  580. 25:59to give him we need to address his
  581. 26:01grievances right and then again we'll
  582. 26:04Implement those things whatever
  583. 26:06suggestions are there and then we'll
  584. 26:08again check whether the performance has
  585. 26:10improved in terms of the number of
  586. 26:12complaints have reduced or not right so
  587. 26:14that is the first stage we need to
  588. 26:16define the objective then this is if
  589. 26:20we'll divide this process into three
  590. 26:22substeps we need to identify the
  591. 26:24Improvement opportunity where we will
  592. 26:26plan that again
  593. 26:28there are so many opportunities for the
  594. 26:30Improvement which opportunity we will
  595. 26:32pick first like I told you the highest
  596. 26:35occurring problem was 20 times right
  597. 26:38which was we were shipping the wrong
  598. 26:40product so there is the greatest
  599. 26:43opportunity we should explore it first
  600. 26:45because then we can reduce the highest
  601. 26:48number of complaints coming from the
  602. 26:50markets right then we need to set the
  603. 26:53measurable targets now if we are uh
  604. 26:56implementing that what what is the
  605. 26:58target next 1 month it should 20 it
  606. 27:01should be reduced to 12 or 10 right then
  607. 27:05again again two months review will be
  608. 27:07doing five then again maybe 6 months
  609. 27:10we'll see the consistency is there or
  610. 27:14not right the way now the new person or
  611. 27:18the same person after that handling the
  612. 27:20Grievances how he is doing that then we
  613. 27:23need to prepare the action plan as per
  614. 27:25that we'll uh prepare that WEA we will
  615. 27:28sustain this plan for other workers also
  616. 27:32maybe others are also not happy right
  617. 27:35now maybe not creating the problem and
  618. 27:37maybe in future that can happen or we
  619. 27:40need to change if we need to change we
  620. 27:42need to come up with the new policy
  621. 27:44right so that we need to take care so
  622. 27:46this is the first stage where we will
  623. 27:48plan then second is do now once we have
  624. 27:52plan we need to test that
  625. 27:55plan so you need to test the plan right
  626. 27:59whether how you can test that you need
  627. 28:01to actually perform as per that action
  628. 28:04so uh in in very simple way if I'll try
  629. 28:07to you know uh conclude this let's say
  630. 28:12uh I'm having some process this is the
  631. 28:14process we are doing right this process
  632. 28:18is having certain
  633. 28:20output now this
  634. 28:23output I need to compare with some
  635. 28:26standards which we have already set up
  636. 28:29in that right so I'll compare with out
  637. 28:32this actual output with the standards
  638. 28:35whatever standards we have set now we'll
  639. 28:37see is there any
  640. 28:41deviation in the actual output from the
  641. 28:44standard if the answer is no we will
  642. 28:49continue with the
  643. 28:56process and this positive feedback is
  644. 28:59provided right if the answer is yes
  645. 29:02there is deviation we need to take the
  646. 29:05corrective
  647. 29:08action not only corrective action we
  648. 29:11need to take the Kaa corrective action
  649. 29:13as well as the preventive action
  650. 29:15corrective action immediately either we
  651. 29:18need to change the process or we need to
  652. 29:21change the raw material being supplied
  653. 29:23or we need to change the technology
  654. 29:26whatever it is taking we need to change
  655. 29:29that thing as per the corrective action
  656. 29:32preventive action is that in future that
  657. 29:35should not happen we should make some
  658. 29:37policy so this is the complete cycle
  659. 29:39right how we are controlling the output
  660. 29:42how we are comparing this output with
  661. 29:44the fixed standard right so you will
  662. 29:47Implement that then you will check so if
  663. 29:50goal has been met then that cycle will
  664. 29:53be over we'll take the next problem if
  665. 29:56it is not met again again we need to
  666. 29:58change we'll take that feedback we'll
  667. 30:01take the corrective action and then
  668. 30:03either we'll change the raw material or
  669. 30:05we'll change the process or we will
  670. 30:06change that technology right act so in
  671. 30:10the end if it is your goal is met we
  672. 30:14need to act accordingly in future as
  673. 30:17well so that means we need to sustain
  674. 30:19that procedure for the other employees
  675. 30:22as well because they may be feeling in
  676. 30:24the same way so this is the first tool
  677. 30:27plan do check act which we can Implement
  678. 30:30and uh we can use to ensure the quality
  679. 30:33through your Logistics distribution
  680. 30:36Network right so how does this plan do
  681. 30:39check act will enhance the logistics
  682. 30:42quality so quality cost are associated
  683. 30:45with obtaining the required quality
  684. 30:48right so they relate for instance the
  685. 30:50deployment of an industrial preventive
  686. 30:52maintenance like we talked about quality
  687. 30:54cost right all the opal cost are quality
  688. 30:57cost whatever we are testing we are
  689. 30:59doing or Manpower training we are doing
  690. 31:01equipment we are using facility we are
  691. 31:03using that those all those things are
  692. 31:05adding to the Quality cost and then non
  693. 31:08quality cost if you are not meeting
  694. 31:10those uh standards and you are making
  695. 31:13the fault delivery again and again then
  696. 31:15you can just imagine your situation in
  697. 31:17the market because then customer will
  698. 31:19not be interested placing order on your
  699. 31:21website right so and if it is related to
  700. 31:25some financial transaction so obviously
  701. 31:27we'll think 100 times before placing the
  702. 31:29order so this is all about uh uh the
  703. 31:33plan to check act cycle in the next
  704. 31:35session we'll continue our uh other
  705. 31:38quality tools which can be used to
  706. 31:40improve the uh Logistics quality uh so
  707. 31:44we'll we'll continue with the 7 QC tools
  708. 31:46so uh that's all for this session thank
  709. 31:48you very much

About this transcript

This page contains the full transcript of Lecture 10 : Tools for Improving Logistics Efficiency by NPTEL IIT Kharagpur, generated from the public captions YouTube serves with the video. The transcript has 4,810 words across 709 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.