- 0:00Good afternoon everybody.
- 0:02>> Good afternoon and good morning perhaps
- 0:07also
- 0:09for those of you from the other side of
- 0:12the ocean.
- 0:14Um yeah, seems like we have a nice
- 0:19participation number
- 0:22and still people are coming in the call
- 0:25but it is 3 minutes over so I guess uh
- 0:29we can get started. Floors if you move
- 0:31the yeah
- 0:33>> the box to the right hand side. Yeah. So
- 0:37uh well thank you everybody for uh
- 0:39joining in on this investor webinar. The
- 0:43last one was in February, so we were due
- 0:45a little bit and we were looking for a
- 0:47time uh to update uh you all as uh
- 0:50you're used to. Uh similar to uh to uh
- 0:55previous uh webinars, you can put your
- 0:58questions during uh the presentation um
- 1:02in the chat. We see the questions coming
- 1:05in here and then uh probably at the end
- 1:08of the session we will answer those uh
- 1:11those questions.
- 1:12So um
- 1:15looking at uh today's topics we start
- 1:18with um business update then a
- 1:22technology update and then a financial
- 1:25update the sequence that we usually um
- 1:28have in these uh meetings. I would like
- 1:31to start by u this picture of uh Winston
- 1:36Churchill. I'm sure you all recognize
- 1:38him and his famous expression, never let
- 1:41a good crisis go to waste. H the crisis
- 1:45we're talking about here is the CO2
- 1:48crisis. And from previous sessions uh
- 1:51you probably remember that we spoke
- 1:54about the CO2 crisis in the Netherlands
- 1:57in the greenhouse sector where the
- 2:00supply is diminishing uh through
- 2:04redirecting CO2 from use to permanent
- 2:08storage under the North Sea the example
- 2:10I always give of Shell 300,000 ton or
- 2:14Yara that is moving 800,000 ton to
- 2:17permanent storage from usage. That's
- 2:19that's a bit of a CO2 crisis and that
- 2:22crisis is deeply felt here in the
- 2:24Netherlands in the greenhouse sector and
- 2:26I'll come back to that topic um uh in in
- 2:30a few minutes.
- 2:32uh we've seen a crisis when the Russia
- 2:35Ukraine conflict broke out and gas
- 2:38prices uh increased drastically and the
- 2:41the price of CO2
- 2:44uh from burning gas in the summer where
- 2:47you don't need the heat was going
- 2:48through the roof. uh and also as a
- 2:51consequence uh fertilizer plants,
- 2:53ammonia plants stopped production like
- 2:55Yaga in the Netherlands which caused a
- 2:58CO2 crisis as if you don't produce
- 3:00fertilizer you can't catch the CO2
- 3:03molecules in the process.
- 3:06Now all of that is true but it's not
- 3:08really uh known or or felt outside these
- 3:12user groups that uh that actually use
- 3:15CO2. And now uh what recently happened
- 3:19is the close of the straight of Hormus
- 3:21still closed and also damaging LG
- 3:24production facilities in Qatar. Uh and
- 3:28this this is really fueling a deeper
- 3:31crisis than ever in the CO2 markets
- 3:34where you need CO2 uh for your process
- 3:38whether your uh water treatment, drink
- 3:41carbonation, food packaging uh or
- 3:44growing uh fruits and and and flowers uh
- 3:50processing uh meat slaughter houses,
- 3:53transport of organs, welding
- 3:56uh um even chip making you need CO2 in
- 4:01your process. And when uh the gas prices
- 4:05uh go up or LG is not available to
- 4:10ammonia and uh fertilizer plants, then
- 4:14there's just no production of CO2.
- 4:17Just to indicate to you how deep the the
- 4:20the crisis already is before this
- 4:23hormuse
- 4:25closure.
- 4:27uh happened is that the UK government uh
- 4:30decided to invest 100 million pounds a
- 4:33couple of months back already in a
- 4:36facility uh to produce CO2 for the
- 4:39industries that need it and I also come
- 4:42back uh in a few minutes what Dutch
- 4:44government is doing. I just wanted to uh
- 4:47emphasize to you that all this talk
- 4:49about CO2 crisis is um is very healthy
- 4:54uh tailwind for Skytree as uh no longer
- 5:00the the the the most prominent reason to
- 5:03uh purchase our machines is that the
- 5:05cost of a ton CO2 could decrease. But
- 5:09more importantly now is the argument I
- 5:13need an independent source of CO2 with
- 5:16stable prices. But supply security is a
- 5:20clear driver as we already see from
- 5:23large RFPs. We get in from a drink
- 5:26carbonator global drink carbonator that
- 5:29really wants to put our technology or
- 5:31similar technology everywhere and stop
- 5:33being dependent on these supply chains.
- 5:36Um we've given the example of Sky Park
- 5:39New Zealand in this audience before
- 5:42where 90% of the CO2 that is used in the
- 5:47country comes from a Thailand fertilizer
- 5:50plant and an Australian oil refinery. Uh
- 5:53prices of more than 500 euro per ton are
- 5:57common and uh is expected to further
- 6:01increase. So a lot of uh disturbance in
- 6:05the markets that we operate in which for
- 6:08us uh is u is a great support for our
- 6:12business model as uh I'm sure you're all
- 6:15aware that this has been a key focus of
- 6:17uh of Skyree from uh uh February 2022.
- 6:24And then we have excellent news to share
- 6:27with you. We are really happy and
- 6:29couldn't be more thrilled than
- 6:31announcing to you that only uh days ago
- 6:34uh about one and a half week ago the
- 6:37first confirmations came in of the large
- 6:40contract for difference or in Dutch on a
- 6:43top subsidy uh in the SD++ scheme. Um
- 6:50uh as uh mentioned in December as well
- 6:53to you, we uh applied for 93 million
- 6:57euro subsidies for the growers uh 11
- 7:02growers with 19 projects which
- 7:05translates into 63 million hardware
- 7:08revenue for Sky Train. As you know
- 7:10there's another 63 million revenue
- 7:14lifetime from uh services and sorbent on
- 7:17top of that what we always talk about
- 7:20the initial investment numbers to be
- 7:22consistent uh and and be comparable
- 7:25and um and this is the first wave uh in
- 7:30October we're going to apply for
- 7:33subsidies again in this in the same
- 7:35scheme u our target is there to apply
- 7:39for 150 million and there's already a
- 7:42list of growers that want to participate
- 7:44and these growers have to pay
- 7:47to collaborate with us to do the
- 7:50submission for the subscri
- 8:07the RVO. It's a lot of work and these
- 8:09growers have to pay. So these growers of
- 8:12this first wave, this is now confirmed,
- 8:14they paid us a consulting fee of 85,000
- 8:18euro and for the for the new scheme um
- 8:22we charge 10,500
- 8:26um and in the next couple of weeks we're
- 8:28going to sign up the next wave of
- 8:31growers and and obviously this is a a
- 8:35major milestone for Skyree as uh there
- 8:38are markets where we're not dependent on
- 8:41subsidy because the CO2 prices are that
- 8:43high. New Zealand being a great example
- 8:46or Australia or some other areas in the
- 8:48world. Uh but for the Dutch greenhouse
- 8:51sector, we need a subsidy to um for to
- 8:56pay to the growers the difference
- 8:58between the cheapest source which is
- 9:00burning natural gas and uh the cost of a
- 9:04ton of CO2 through our machines. and and
- 9:07our estimation is we need four or five
- 9:09years of subsidy before we with our
- 9:13technology are low enough in costs um to
- 9:17uh no longer uh need that. And then as
- 9:20explained to you before in webinars,
- 9:23there are various ways in how we cost
- 9:26down our technology, but we start of a
- 9:29very low uh level of electricity
- 9:31consumption, the lowest that we observe
- 9:33around the world. That's also what we
- 9:35hear from our customers around the world
- 9:38that we currently are championing this
- 9:41sector uh with uh not with prototypes
- 9:44but with uh machines ready for
- 9:46deployment. Um but we need to further
- 9:48cost it down so that in the future we
- 9:50don't need these subsidy schemes
- 9:52anymore. But the Dutch government uh has
- 9:56been very positive because they see the
- 9:59importance of what we do with our
- 10:01technology is offering these green
- 10:03houses continuity so that they can exist
- 10:06in the Netherlands to sec by securing
- 10:09their CO2 supply. But we also help them
- 10:12to transition to fossilfree food
- 10:15production which is another important
- 10:17driver behind the government's support
- 10:20for Sky Tree. Then thirdly, which is I
- 10:22think relatively new to most of you, uh
- 10:26we also combine uh the use of CO2 in the
- 10:29Dutch green houses with uh permanent
- 10:32storage under the North Sea, Portos and
- 10:34Aramis projects so that you can spread
- 10:37your investment in carex over uh the
- 10:40full season and not only use our
- 10:42technology in spring and summer when you
- 10:45need the CO2, but in the fall uh and in
- 10:49the winter you can continue to produce
- 10:51CO2 uh and use your your machines uh all
- 10:55year round. Um as these uh growers that
- 10:59are connected to the OKAP pipeline are
- 11:02physically connected to Porto and Iramis
- 11:05as well. So government is paying uh the
- 11:10growers to catch CO2 molecules from the
- 11:13air and use existing infrastructures,
- 11:16the Skyree machine, the OKA pipeline and
- 11:19the government funded storage sites uh
- 11:22under the North Sea um uh to create
- 11:26negative emissions and negative
- 11:28emissions the country can the Dutch
- 11:31government can put in their bookkeeping
- 11:33uh you know preventing uh bad things
- 11:36from happening if we don't meet our uh
- 11:38legal requirements for uh combating
- 11:41climate change, reduction of emissions.
- 11:44So u everybody is very happy uh with
- 11:47this whole scheme uh and the role uh we
- 11:50played and now we have proof of uh this
- 11:54what we always spoke about what we
- 11:55worked on for three years as these
- 11:58confirmations have been u sent in
- 12:01written form to the first uh group of uh
- 12:04growers u and to us. So
- 12:09happy moments here at Skyree. Um we
- 12:13changed the look uh a few times. They
- 12:16also became bigger unfortunately but it
- 12:19became bigger because we had to work
- 12:21within the formulas that we agreed with
- 12:24the Dutch government. So to to be
- 12:27successful in the Dutch greenhouse
- 12:28sector and here you see um uh this is
- 12:32the last version we promise because this
- 12:34is gone to the authorities also for
- 12:37permitting uh and we're getting close uh
- 12:40to finalizing designs and uh production
- 12:44as Flores is going to explain to you.
- 12:47>> Yeah, the next yeah topic.
- 12:49>> Yeah. So uh catching on very briefly,
- 12:52this is indeed the the the rendering of
- 12:55what the first Stratus machine will
- 12:57actually look like uh in the first
- 13:00deployment that we will do which will be
- 13:02at what we call Sky Park Arnham Na in uh
- 13:07in Bemo um later in in in the year. We
- 13:11are fully um in preparation mode in
- 13:14executing this. Uh and as you can see uh
- 13:17the the final result of the first
- 13:19stratus machine uh is a a very sizable
- 13:22machine uh 15 m tall uh and 18 m in
- 13:27length and in in width uh for this
- 13:30particular uh configuration.
- 13:33Um now how have we gone about uh this
- 13:37from where we set off I guess uh not
- 13:41even so long as about 2 years ago when
- 13:42we were still thinking the machine was
- 13:44going to be significantly smaller. also
- 13:47by the way producing less CO2 and at
- 13:49higher energy consumption because
- 13:51>> higher price per ton
- 13:52>> higher price per ton. the the the
- 13:54machine has been optimized for lowest
- 13:56possible price per ton, not so much
- 13:58physical dimensions, but the physical
- 14:00dimensions by itself pose a challenge to
- 14:03us. Um because it's uh uh not only a
- 14:07very large machine which means that the
- 14:09weight is very very uh um very high but
- 14:13also because the different competencies
- 14:14required in manufacturing uh the in the
- 14:17inside um is um
- 14:21not able to be single sourced. Uh so
- 14:24what you can see here on the screen is
- 14:26that we have uh split out the module or
- 14:30the machine in seven different modules.
- 14:33Uh and each module has a different team
- 14:36both here internally working on it but
- 14:38as well as using different suppliers and
- 14:40contract manufacturers that are
- 14:42specialists in their uh relevant areas
- 14:45to bring this uh together. Um the most
- 14:48complex uh uh by far the most complex
- 14:52and in-house designed are the top three
- 14:55uh which you can see is the absorber,
- 14:57the dorberer and GPU which stands for
- 15:00the gas processing unit which is in its
- 15:03fundament the heart of the machine. Um
- 15:06some of the bars on the lower modules
- 15:09are less spread out. Uh they shouldn't
- 15:11concern you. These are significantly
- 15:13less complex uh uh elements of the
- 15:16machine. Uh enclosures being effectively
- 15:19only the housing and outside shed around
- 15:21it which is uh by its nature uh the last
- 15:25thing uh currently in design. But also
- 15:28here uh even though 25% still production
- 15:31will start in weeks from now uh just to
- 15:34give you an idea of what the pace is
- 15:36that this is currently operating at um
- 15:40by itself. So how will this play out in
- 15:42in what we attempt to do in uh in this
- 15:44first deployment? We expect that uh by
- 15:47the end of July uh
- 15:50the uh all of these modules will have
- 15:53been completed in the factory in
- 15:56production and will be ready to be
- 15:58brought to the location in Beiml uh
- 16:00which over the summer we will start the
- 16:02assembly and commissioning process that
- 16:03we expect to be uh completed uh um
- 16:07throughout uh the end of the first
- 16:09quarter. Uh well in parallel we have a
- 16:12second build that has started uh which
- 16:14is uh also be to be deployed this year
- 16:18uh at uh ULI in Germany that we
- 16:22mentioned before which is not a
- 16:23greenhouse project it's a project to
- 16:25produce e- fuels
- 16:27>> and by the way you will all receive an
- 16:30invitation
- 16:32uh once uh we go live in Bemo in the
- 16:35east of um of the Netherlands.
- 16:38>> Correct. the opening party.
- 16:40>> Absolutely. Um, so let's look and give
- 16:43you a little bit more insight into what
- 16:45does the machine actually look like from
- 16:48the inside. And I will be very brief
- 16:51about this, but I think it's it's very
- 16:52nice to give you an idea and not just
- 16:54looking at a very big shed outside, but
- 16:56what's actually inside. Um, on the left
- 16:59hand side here is what we call the
- 17:01absorption uh module. There is actually
- 17:04three of them next to each other of this
- 17:07size uh which will be part of the
- 17:09machine. And what will happen here is
- 17:12that air will be blown in a very high
- 17:14volumes through these uh uh structures
- 17:18here which are filters. uh and the
- 17:21sorbent it's the active uh capture
- 17:24material used in the machine will flow
- 17:26gradually from the top here to the
- 17:29bottom absorbing itself with the CO2 as
- 17:32it comes into contact with air. Once it
- 17:36reaches the bottom of uh uh of this
- 17:39chamber, it will be transported to what
- 17:42we see here is the disorption uh tower
- 17:45which is a setup of two vacuum chambers
- 17:49which inside there is our uh heat
- 17:52exchangers uh whereby we use heat
- 17:55preferably
- 17:56waste heat available on the location of
- 17:59a customer but if need be electrically
- 18:01generated heat uh to um start the
- 18:05removal process. Uh that very simply is
- 18:08if the uh absorbed capture material
- 18:11comes into contact with heat of a
- 18:13certain temperature, the chemical uh
- 18:16bond with CO2 is released and we capture
- 18:18the CO2 which we then transport to what
- 18:21we here have is the gas processing unit
- 18:24because we don't only capture CO2, we
- 18:26also capture water. So in principle here
- 18:30the dehumidification takes place as well
- 18:32as the conditioning of the CO2 to
- 18:35provide a pure uh 89%
- 18:39plus pure stream of CO2 uh to our
- 18:42customer
- 18:43>> 98
- 18:44>> 98 sorry I'm saying 98 correct yes
- 18:48>> now so what are some of the other
- 18:50elements involved uh this is the
- 18:52transportation unit which by itself in
- 18:54between these brackets will have the
- 18:56three absorption systems
- 18:58And here on this side it will have the
- 19:01disorption tower. Uh and here this is a
- 19:04mechanical bucket conveyor transport
- 19:06system. And so the uh the the capture
- 19:09material will be physically uh moved and
- 19:13transported from one module to the next
- 19:15with buffering capacity here on the
- 19:18side.
- 19:20Uh
- 19:22the next module is what we call the TMU,
- 19:24the thermal management unit, which
- 19:26effectively is the unit which will
- 19:28provide the heat to the disorption
- 19:30system but also will use the heat
- 19:33already generated earlier as much as
- 19:36possible uh in a recycling pattern uh so
- 19:40that we lower the electricity and energy
- 19:42consumption as much as possible. And if
- 19:45need need be this will be a closed loop
- 19:48fully electrical uh system. But as I
- 19:51said preferably and especially also for
- 19:52the first project in uh in Bemo uh this
- 19:55will be uh the use of onsite available
- 19:59thermal energy. Um and as a last uh
- 20:02module here we have the control system
- 20:05which is effectively the electronics
- 20:08>> and software
- 20:10>> and software. Yes. So uh uh putting it
- 20:12all together without the cladding you
- 20:14saw in the previous render. This is uh
- 20:16uh what it uh what it will look like.
- 20:19And uh when we scale up and we move into
- 20:22different project larger projects um one
- 20:25of the key benefits we have of the
- 20:27architecture uh that we have chosen is
- 20:30that as we scale up we reduce the cost
- 20:34and we reduce uh in particular therefore
- 20:37the cost per ton for the customer. And
- 20:39the reason is is actually very simple
- 20:41and you can see it here quite
- 20:43intuitively. As we scale up we will add
- 20:46more absorption towers. Uh and for every
- 20:49three we can add one disorption towers
- 20:52but for the rest the rest of the machine
- 20:55uh effectively almost stays the same. uh
- 20:58uh so uh as we scale up linearly the
- 21:02capacity increases the costs do not
- 21:04linearly increase they decrease uh per
- 21:07ton of CO2 captured going forward
- 21:11>> until 2700
- 21:13>> until this we expect until 2700 kilos
- 21:16although it might actually be a little
- 21:17bit more than that and then we have to
- 21:19replicate these machines but it means
- 21:21there's significant uh advantage in
- 21:23scaling up uh for large projects that we
- 21:26have uh of which we have so in our in
- 21:28our pipeline. Um here are for you some
- 21:31uh some pictures of the actual
- 21:33production uh of uh of of um the
- 21:37different modules by which you can see
- 21:39that the gas processing unit for a very
- 21:41large part has already been completed.
- 21:43These are closeups of the uh the mesh
- 21:45panels which are the filters which are
- 21:47inside the absorption tower. Uh and here
- 21:51on the right hand side you can see the
- 21:53steel frameworks of uh the vacuum
- 21:56chambers that are part of the disorption
- 21:59tower. Uh and last not but least this is
- 22:02the first um uh location at at Bemo
- 22:06where the first machine will be deployed
- 22:08and where uh the ground works are uh are
- 22:11just about to uh to start up to to start
- 22:14laying the concrete foundations.
- 22:16>> Explain what what we're looking at here.
- 22:18Uh what we're looking at here is
- 22:20currently u a site of one of the green
- 22:22houses. You can see the back of one of
- 22:24the green houses which will actually
- 22:26receive the CO2 from uh from this
- 22:28particular project which is currently
- 22:30still a area of using for grazing by
- 22:34Shetland ponies. But don't worry the
- 22:36ponies will move to another facility
- 22:38where they continue to uh to foster on
- 22:40the ground.
- 22:41>> This is uh uh taking uh samples from the
- 22:44bottom. This is yeah the soil samples to
- 22:47test to test the soil to make sure that
- 22:49all of the calculations done for the uh
- 22:51the concrete uh infrastructure
- 22:54uh line add up effect
- 22:57>> the first physical work of our sky park
- 23:00R&M I made
- 23:01>> exactly
- 23:04>> yeah so this is uh actually one of my
- 23:07favorite uh slides has been used uh in
- 23:11several presentations internally and
- 23:13externally as Uh we've been audited uh
- 23:16on our requests by BSI, an external
- 23:20agency
- 23:21uh to see if we would be fit for
- 23:25certification for ISO 9,0001 and ISO
- 23:2927,0001.
- 23:31ISO 9,0001 being for quality uh in the
- 23:35way you are organized and 27,01
- 23:39uh for information security or cyber
- 23:42security. Um and those uh those
- 23:46certifications are are not a goal. We
- 23:49don't work toward a certification.
- 23:52Uh and and the reason why why I'm really
- 23:55proud of this is because the
- 23:57certification
- 23:59is a testament to how well you are
- 24:02structured and organized, how well you
- 24:04protect your uh sensitive um uh IP
- 24:09information about your IP, but also your
- 24:11infrastructure which is essential to
- 24:13operate. So your your business
- 24:15continuity.
- 24:17Um and the the the auditors uh that uh
- 24:20interviewed us and looked at all our
- 24:22systems and uh the way we work were very
- 24:25very positive. They said, "Well, we've
- 24:28seldom seen a company that is so well
- 24:30organized uh in in the early years of
- 24:33existence, you know, doing what you guys
- 24:35are doing, deep tech development in
- 24:38uncharted territory, in new markets with
- 24:40new tech, uh new people, new systems,
- 24:46everything built,
- 24:48changing the tires or building the plane
- 24:50while flying it is is a better way of
- 24:53seeing it. So I personally I'm very
- 24:56proud of uh of this recognition of BSI.
- 25:00It will result in the certifications and
- 25:03this really sets us apart as a project
- 25:05partner for large customers that don't
- 25:08want to deal with a startup for an
- 25:12essential feed stock in their uh
- 25:14business process. Uh just to give you an
- 25:17example, we're we're we're well on the
- 25:20way with Fonta for Sky Park New Zealand.
- 25:23not only as a launching customer, but
- 25:25there's they're also interested to
- 25:27become a shareholder in a in a joint
- 25:30venture with us. Um, this is the largest
- 25:35company in the country,
- 25:38right? Uh, they're also the largest CO2
- 25:41consumer. They are they're a big
- 25:43enterprise. So, Asahi uh we're
- 25:47discussing with who wants to to talk to
- 25:49us throughout their locations in in in
- 25:52Australia and Asia in a multi-year
- 25:55deployment uh setting. So, this is not
- 25:58like, you know, a carbon removal startup
- 26:01that raised money that is looking for
- 26:04technology. We're really ready to do
- 26:06business in a very serious way with
- 26:08large enterprises that want our techn
- 26:12want to deploy our technology to secure
- 26:14their future supply to have stable
- 26:17long-term pricing and then you know as a
- 26:20bonus also convert or transition I
- 26:23should say to u a non fossil uh fuel
- 26:26source and if there are consumer bands
- 26:29uh then work on their reputation as a
- 26:31good company.
- 26:34So uh with this I think we go to the
- 26:37third topic uh financials. Uh Flores uh
- 26:40over to you.
- 26:41>> Exactly. So uh let me kind of give you a
- 26:45short recap of of where we've been in in
- 26:47raising this investment round as the A
- 26:50round has already uh been open for uh
- 26:53for quite a bit of time as well as uh
- 26:56the fact that we are uh closing with a
- 26:59consortium of investors which consists
- 27:02of global clean tech capital invest
- 27:05international and the European
- 27:07investment bank. Um the process by
- 27:11itself in particular the duration also
- 27:13of the required due diligence which is
- 27:15uh uh running at its uh uh at its at its
- 27:18very end u um at this point in time uh
- 27:22has uh effectively forced us to already
- 27:25close a little bit earlier. So uh both
- 27:28in uh the end of December just before
- 27:30Christmas as well as at the end of March
- 27:33uh we already executed two closings of
- 27:36this round uh whereby that means that
- 27:40the terms and the price per share are
- 27:42equal for all of the investors that
- 27:44participated in these rounds. Um and um
- 27:48the closed and transferred amount in
- 27:50both uh events has been uh 10 little
- 27:53more than than 10 million euros which is
- 27:57for the very for the largest part and
- 27:59and uh uh accounting for almost half uh
- 28:02the existing investors which includes
- 28:04the management and and and the backers
- 28:06that we have. Uh but also we're very
- 28:08fortunate to bring on board two new uh
- 28:11shareholders into the cap table. uh both
- 28:14having transferred two and participated
- 28:16for 2 million. One being Iconic Ventures
- 28:20uh and the other being Silylvanas which
- 28:23is a recently uh um established
- 28:26investment entity from a Dutch
- 28:28entrepreneur uh called Aford Fonder.
- 28:32Alongside him also a group of new angel
- 28:35investors uh uh joined the company and
- 28:37participated up to a million euros in uh
- 28:41that last period of uh of time. So I
- 28:44think we're very fortunate that even
- 28:46though uh it takes a little bit longer
- 28:48than we anticipated with the original
- 28:50consortium uh we found these two
- 28:52investors which I think are both very
- 28:54entrepreneurial and supportive uh of of
- 28:56of what we've done uh and also working
- 28:59towards uh and working with us in uh
- 29:02trying to close the rest of the
- 29:04consortium um which is at this point in
- 29:07time scheduled for closing in the middle
- 29:10of June. So about a month from now um
- 29:14after this uh uh this round uh we do
- 29:17expect uh and are aiming to do one more
- 29:21equity round uh which we will call a
- 29:23series B. Uh the reason for that is that
- 29:26we are uh uh very uh always planning
- 29:30very tightly when it comes to uh to cash
- 29:33flow and even though we have outlook in
- 29:35a lot of different scenarios that this
- 29:37would be the last equity round that we
- 29:39would do. Uh looking at the pure size of
- 29:42our machine and the nature of the
- 29:45investments that it will take to bring
- 29:47that machine into a larger manufacturing
- 29:50cycle. uh we expect it's very wise to
- 29:53make sure that we have sufficient
- 29:54capital buffers uh so that also the
- 29:57large companies and the large
- 29:58manufacturing companies that we want to
- 30:00work with as well as the larger
- 30:01customers we want to work with to
- 30:03offtake those agreements are not in
- 30:05doubt in any way shape or form about our
- 30:08credit credit worthiness.
- 30:10>> Yeah. And just to add one more thing
- 30:14here, Florence, what we also found is
- 30:17that larger customers uh are not so easy
- 30:23to agree payment terms with. I mean, if
- 30:26you work with a greenhouse, you say,
- 30:28well, this is the payment schedule, and
- 30:30if you don't follow that payment
- 30:31schedule, then we can't do business, and
- 30:33we want to get the cash from our
- 30:36customers before we pay our supply
- 30:38chain. But some larger customers just
- 30:42can't do that. Uh for instance, UNIL, uh
- 30:45we agreed the payment schedule with
- 30:47them. So, uh by now we should have
- 30:49received 500,000 euro in our bank
- 30:52account that you then can use to
- 30:54purchase components for their machine,
- 30:56but their internal rules are that they
- 31:00uh that they pay, but they need a bank
- 31:03guarantee from us. That means that we
- 31:05can't use that money. So in our models
- 31:08we are banking on a cash positive supply
- 31:10chain but in real life that would mean
- 31:13that we have to walk away from uh
- 31:15opportunities of very large customers
- 31:18that want uh bank guarantees. So that's
- 31:20also something I think uh
- 31:22>> we're considering
- 31:23>> that's absolutely something that we're
- 31:25considering. Uh uh just for your
- 31:28information uh uh the total amount which
- 31:30is um uh concerned around this what we
- 31:34call the third close is uh is 9 million
- 31:36that's so that will make the total a
- 31:38around 19 a little more than 19 million.
- 31:42Um
- 31:43but uh we understand also from from your
- 31:46perspective that at the current
- 31:48valuation the effect on dilution is uh
- 31:52uh is is very real. uh uh so at the same
- 31:56time when effectively this is still our
- 31:58our a scenario. So we are uh we are
- 32:01fully continuing with this scenario. We
- 32:03have started to work on potential
- 32:06alternatives to this scenario in finding
- 32:09ways to limit dilution at the current
- 32:13valuation for all existing shareholders.
- 32:16Um and
- 32:19the way for us to do it is to ensure we
- 32:22have sufficient runway to uh do a series
- 32:26B at a higher valuation
- 32:28>> and earlier
- 32:29>> and earlier and there are effectively
- 32:31for us two events which allow for us to
- 32:34raise a series B at a higher valuation.
- 32:37The first one being that we have a
- 32:40substantiated
- 32:41project, a pipeline of opportunities
- 32:44turned into actual contracts which
- 32:47through the granting of the SDE scheme
- 32:50we have now uh surpassed. Uh the second
- 32:53will be the deployment and uh assembly
- 32:57and commissioning of the system in
- 32:59Arnham Na. uh uh so uh at this point in
- 33:04time we are speaking to other investors
- 33:06that could participate in such a series
- 33:08B that we just don't for which a series
- 33:12A is just outside of their investment
- 33:14mandate. Uh we have I think quite a lot
- 33:18of confidence that we will be able to um
- 33:20to achieve that uh if we are able to
- 33:24extend the runway sufficiently to do it.
- 33:27Um which is why uh we are looking at
- 33:31trying to uh um beef up our existing
- 33:35runway and cash position as much as
- 33:37possible. Now, we've had uh Rob and I
- 33:40have had a lot of conversations with a
- 33:41group of existing shareholders uh in the
- 33:44last couple of weeks. Uh and we are very
- 33:47close to already having 3 million uh
- 33:50committed. Um as part also of this third
- 33:54close at the same valuation, which is at
- 33:57this point in time still 36 million pre-
- 33:59money. Um and at the same time we are
- 34:03working with uh quite a bit of
- 34:05opportunities to of nondilive cash
- 34:08sources such as venture depth revenue
- 34:11from consulting that Rob mentioned. uh
- 34:14do we will receive prepayments from
- 34:16customers. Uh we will definitely receive
- 34:19prepayments from Sky Parks for which we
- 34:21are the customers and which we are
- 34:23obtaining funding for and we are getting
- 34:25in uh subsidies. But in particular, we
- 34:28are expecting to start issuing in the
- 34:30next couple of weeks a convertible bond
- 34:32on the NPEX exchange market uh for which
- 34:35we expect to pull in uh a significant
- 34:39amount of uh funding. And if we are
- 34:42successful in that combined with uh
- 34:45increasing the existing investor
- 34:47commitment beyond the 3 million that
- 34:49we've currently envisioning, we might be
- 34:52able to significantly limit this third
- 34:55close. um by just limiting the amount of
- 34:58money or issue shares that we will issue
- 35:00under the same valuation to the
- 35:02consortium and move to a series B uh
- 35:05earlier. Uh we think that by far this is
- 35:08the best scenario for existing investors
- 35:11from an anti-dilution perspective and it
- 35:14is therefore um a open invitation to all
- 35:19investors uh in particular the ones uh
- 35:22in in in the stock that we have not yet
- 35:24had very active conversations with
- 35:25around this topic to participate in this
- 35:28round at this low valuation. in
- 35:31particular now in hindsight now the SDE
- 35:34uh subsidies have been granted and
- 35:36there's no longer a risk associated to
- 35:39that um and participation at this point
- 35:42in time happens at equal terms. So
- 35:45everybody gets the same low share
- 35:48valuation uh as the new investors would
- 35:51do. And we think that if we are able to
- 35:54attract sufficient funding and and
- 35:56exceed our 3 million window at this
- 35:58point in time that with the additional
- 36:00uh runway extension mechanism and tools
- 36:03that we have, it gives us our best
- 36:06option of limiting further dilution
- 36:09while we maintain to have the fallback
- 36:11scenario of uh uh the 9 million to be
- 36:15closed in uh in June. So correct like
- 36:18we're actively uh pulling the plug on
- 36:21that.
- 36:22>> Absolutely not. So we can always do that
- 36:24deal but you know it might be smarter
- 36:28for everybody here in the call from uh
- 36:31return on investment perspective to um
- 36:34to limit that uh round uh and postpone
- 36:38it and then get more money in on a
- 36:42higher valuation and then the valuation
- 36:44is like two times or more. the current
- 36:47valuation, right? That's what
- 36:48>> the longer we can extend it, the higher
- 36:50we can uh we can ask our valuation, but
- 36:52our target is at least three times the
- 36:54current valuation. Yeah.
- 36:55>> Yeah.
- 36:57>> Okay. So, that brings us to the end of
- 37:00our monologues uh today and we can turn
- 37:04to some questions. Uh first question we
- 37:08have here is from Victor. Uh I'm not
- 37:12sure if you know the answer to that but
- 37:14the question is what is the uh number of
- 37:20certificates in the stack floors?
- 37:24>> I don't know by heart the number of uh
- 37:27of of certificates or depository
- 37:29receipts. Uh I think at the end you
- 37:32probably want to calculate what your
- 37:33shareholding is. So I would advise you
- 37:36to maybe email me your direct question
- 37:39and I can give you a very precise
- 37:41answer. Uh but overall the existing
- 37:43share capital today after the two
- 37:45closings but before the third close is
- 37:48that we have approximately 17 million
- 37:51shares outstanding in our share capital.
- 37:55>> So Bea thanks for asking uh the
- 37:57question. Um uh the question is looking
- 38:01at the larger size of uh stratus is this
- 38:05departure from the distributed deck
- 38:08vision. Um the answer is simple bea it's
- 38:12not uh we still very much believe in
- 38:15decentralized as we mostly called it but
- 38:17also uh distributed uh direct air
- 38:21capture. Um
- 38:24uh but uh it is a larger machine. Uh
- 38:27that means that only uh sites that have
- 38:31sufficient uh square meters don't have a
- 38:35permit issue uh you know because they're
- 38:37not in a in a living community.
- 38:41uh uh and and and uh have sufficient
- 38:44power available um uh to run the machine
- 38:48will qualify as customers and then uh
- 38:53those are typically not the very small
- 38:55green houses uh which we see uh in our
- 39:00pipeline uh and specifically the new
- 39:03wave of uh green houses that we're
- 39:06talking to for the October 26 SD the E++
- 39:11submission those are you know even
- 39:13larger uh green houses. Um and what we
- 39:18also uh see is that sky parks are um uh
- 39:25sort of addition to the distributed
- 39:28concept.
- 39:30uh because
- 39:32sky parks like New Zealand or Iceland
- 39:34also here in in the Netherlands we
- 39:37aggregate demand within
- 39:41a certain geographical area so that the
- 39:45CO2 users don't have to buy a machine
- 39:48have to have the land each of them
- 39:51individually
- 39:53um we can ensure we have sufficient
- 39:56power but also uh you So if our machine
- 40:00does 900 ton a day, sorry, a year and
- 40:04you need a,000 ton a year, you have to
- 40:06buy two machines. That's not very uh
- 40:08capital efficient. So what we also do is
- 40:12what we call aggregate demand. So you
- 40:14have a group of CO2 users that make use
- 40:17of one uh deck hub based on stratus that
- 40:22can be a 70 to 100 ton a year machine or
- 40:26it can be two or three. So uh the sky
- 40:30park concept is leaving the completely
- 40:34uh uh distributed deck vision a bit but
- 40:39the technology itself uh is not
- 40:45uh there's a uh a question around the
- 40:48annual report. I think the annual report
- 40:50is almost done. Florence
- 40:52>> the annual report is done. It is uh
- 40:55submitted to the shareholders for an
- 40:57approval in the general shareholders
- 40:59meeting which takes place this Friday
- 41:01and after it's been approved and all
- 41:03formalities have been taken into account
- 41:05we can distribute it w more wider
- 41:07amongst all of the shareholders. Um the
- 41:10current price per share is as I said we
- 41:12are currently raising at 36 million pre-
- 41:15money which equals €211
- 41:18per share. Uh so it's very precise at
- 41:21this point in time because we're in an
- 41:22active fundra that would change if we
- 41:24would indeed be able to close uh this uh
- 41:27this this uh series A in a limited
- 41:30fashion and then move towards a series B
- 41:33uh for which we aim a uh at least three
- 41:36times rise in valuation. If you would
- 41:39that uh take that into account that
- 41:41would make it uh more than €6.33
- 41:47per share at that point in time. But at
- 41:49this point in time that is speculation
- 41:51uh once we actually are in talks of
- 41:55sufficient um level of concreteness that
- 41:59allow for a valuation uh and an
- 42:02investment amount in that uh in that
- 42:04scenario it will be discussed with their
- 42:06uh with the investors.
- 42:09>> Yeah. So uh question around Bosch uh is
- 42:14are they renewing uh their interest uh
- 42:17in uh in partnering with us? Um I don't
- 42:23even know when the last contact has
- 42:25been.
- 42:26>> Last contact's been for a couple of
- 42:28weeks. uh some things have changed
- 42:30strategically in Bosch which uh for them
- 42:34uh all of a sudden uh made their
- 42:37appetite to move the uh development and
- 42:41investment uh project with us uh into a
- 42:44lower uh lower appetite. Uh the
- 42:48conversations are still ongoing. Um but
- 42:51at the same time uh also our perspective
- 42:55has changed a bit. So uh what was for us
- 42:59very interesting in the collaboration
- 43:01with Bosch uh effectively were three
- 43:04things. Uh one was the ability to cash
- 43:06payments that they would give to us
- 43:08which would be
- 43:09>> non dilutive non which would be an
- 43:11alternative to the investment. Now
- 43:13closing an investment round would
- 43:15mitigate that particular uh uh problem
- 43:19although with with dilution. Uh the
- 43:21second was uh access to technological
- 43:25resources in particular helping us uh in
- 43:28the deployment of our first system where
- 43:31the technology risk and the deployment
- 43:33risk is the highest. Um given that at
- 43:36this point in time we don't have
- 43:38formalized an agreement yet uh but we
- 43:41are on track in delivering the project
- 43:44our dependency on that has uh uh been
- 43:47reduced significantly because we are
- 43:50progressing on our own merits uh in our
- 43:52uh own timeline as planned. Um slight
- 43:57delays but nothing uh nothing too uh too
- 44:01out of the ordinary. uh and the third
- 44:04is uh to jointly uh move into uh the CDR
- 44:09market uh and where on the one hand we
- 44:11are speaking about a CO2 crisis which is
- 44:15very tangible for us in to deliver uh
- 44:18CO2 to real economy companies that
- 44:20actually need it. Uh there's also I
- 44:23think something of a crisis going on in
- 44:24the CDR landscape in the last couple of
- 44:26months but maybe you want to
- 44:28>> Yeah, it's a good point. Uh so just to
- 44:31remind you, Bosch was not focused nor
- 44:35interested in what we call the CCU
- 44:37markets. Uh which caused frictions in
- 44:40the in the in the dialogue uh from from
- 44:42from the first point onwards as Borch
- 44:46has a strategy to get into the market by
- 44:492030
- 44:51uh and then only focus on CDR on
- 44:53permanent CO2 storage. And we said well
- 44:56that's fine. We also want to do that in
- 44:58a joint venture with you and and but we
- 45:01we don't want to wait until 2030. But
- 45:04first we have to take our technology in
- 45:07production in order to cost it down to
- 45:09mature it to further develop it. Uh and
- 45:12also we we can't just keep on investing
- 45:15until 2030. Uh and then promise to
- 45:18investors that someday there will be a
- 45:20return. It's just not our reality.
- 45:23Um, so
- 45:26Bosch now is still with this with their
- 45:30plan for 2030 CDR,
- 45:33then potentially collaborating with 280,
- 45:38the Google spin out as they told us. But
- 45:41then the CDR market in 2030 really uh I
- 45:45mean that's a market that is mainly
- 45:47depending on carbon credits.
- 45:50uh 90% I don't know the exact number but
- 45:5490% 90 it was around at least it was
- 45:57around 90% 90%
- 46:00of all purchases of carbon credits so
- 46:03far pre purchasing or purchasing
- 46:07commitments was done by Microsoft and
- 46:10they stopped purchasing so 90% of the
- 46:14current market of carbon credits
- 46:16vaporized
- 46:18now For us, it doesn't matter because
- 46:21we're not focused on CDR business. We're
- 46:24one of the few debt companies that never
- 46:26sold any carbon credits as we explained
- 46:29to you as an audience many many times
- 46:32that we firmly believe that there's a
- 46:34great market for CCU. Actually, I had to
- 46:39calculate the market potential for our
- 46:41machines for the due diligence uh with
- 46:44Invest International.
- 46:46Um and uh and our analysis is that the
- 46:49market for our machines in in merchant
- 46:53and greenhouse markets is 200 billion
- 46:57euro. Then there's another 200 billion
- 47:00surfaces, right? And and we have to see
- 47:02what the market will be in 2030 for CDR.
- 47:06So maybe it was a good karma that we
- 47:09didn't proceed uh as it might have been
- 47:12a big destruction of our core strategy.
- 47:14But that's easy to say at this point in
- 47:17time looking backward.
- 47:19>> Yeah. And maybe put some some some
- 47:22further context that when we say proceed
- 47:25is because we were at the threshold of
- 47:27Bush uh coming to us and saying uh we
- 47:32don't want to work with you um if you
- 47:36retain your strategy focused on CCU. And
- 47:39our position was we will not change our
- 47:41strategy diverting away from CCU
- 47:45>> only to have a relationship with Bosch.
- 47:48We think that we have the right
- 47:50strategy. We are willing to convince you
- 47:52and your board that we have the right
- 47:54strategy. Uh that is also if you speak
- 47:56what is the contact that we've been
- 47:58having over the last couple of weeks. it
- 47:59has only been focused on that and also
- 48:01to provide the champions that we still
- 48:03have within their organization that want
- 48:05to move forward with us with the
- 48:07ammunition of using that internally. Um
- 48:11but they're struggling uh and their
- 48:13struggle is not over at this point in
- 48:15time because also from a Bosch
- 48:16perspective deck is not their main
- 48:18priority. uh they have a lot of
- 48:20difficulty uh surviving in the uh
- 48:23electrification of automotive uh for
- 48:25which they are not one of the front
- 48:27runners and uh we think that uh it might
- 48:30very well be that they will come back to
- 48:32us uh in the coming period to continue
- 48:35our conversations. Uh we think that at
- 48:38that point in time also given our
- 48:39progress we would need to come up with
- 48:41different terms in our ability to do
- 48:43that.
- 48:44>> We won't do that deal
- 48:46>> not under the same terms at this point
- 48:48in time. Uh so uh but it's it's it's at
- 48:51this point still out in the open. So
- 48:53sorry for taking a long time and being
- 48:55slightly vague on it, Bea, but there's a
- 48:58lot of context around it that I think is
- 49:00very important that you really grasp the
- 49:02granular at a granular level.
- 49:05>> Yep.
- 49:06So we don't have any more questions
- 49:11which is great. We the last time we also
- 49:13ended a little bit earlier.
- 49:15>> So we might even start to shorten uh
- 49:18these webinars. Uh so let me conclude by
- 49:22thanking you again for uh uh being
- 49:25present in this live broadcast. Uh as
- 49:29always you will get uh a recording and
- 49:32as always if you have individual
- 49:35questions and if you want to participate
- 49:37in uh this uh round uh feel free to
- 49:42contact uh Flores.
- 49:44The next one will be midsummer where we
- 49:47have a lot of exciting announcements
- 49:50again.
- 49:50>> Exactly. Exactly.
- 49:51>> Thank you all.
About this transcript
This page contains the full transcript of Investor Webinar May 2026 by Skytree, generated from the public captions YouTube serves with the video. The transcript has 7,331 words across 1,053 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.