  1. 0:05a warm welcome to 365 careers YouTube
  2. 0:13channel we are really excited you're
  3. 0:15watching this video our mission is to
  4. 0:17create some of the best business finance
  5. 0:19and office productivity tutorials and
  6. 0:21deliver them to you right here our
  7. 0:23channel is updated on a weekly basis so
  8. 0:25make sure you click the subscribe button
  9. 0:26below and stay in the loop for
  10. 0:28interesting and career enhancing video
  11. 0:30tutorials
  12. 0:33welcome to the world of project
  13. 0:35management so let's begin with an
  14. 0:38important question what is a project is
  15. 0:43it a bird is it a plane we constantly
  16. 0:48hear music bands artists sporty managers
  17. 0:51politicians say my project I have a new
  18. 0:55project the project about etc so is it
  19. 1:00just another buzzword used to make some
  20. 1:02activities sound more sophisticated no
  21. 1:06it's something much much different a
  22. 1:09project is something real exciting and
  23. 1:12extremely useful for people that want to
  24. 1:14accomplish their future ideas so let's
  25. 1:17get back to the main question what is a
  26. 1:21project
  27. 1:23the project management institute defines
  28. 1:25it as a temporary endeavor undertaken to
  29. 1:29create a unique product service or
  30. 1:31result
  31. 1:33in other words it's a temporary
  32. 1:36initiative that is agreed planned and
  33. 1:38executed to achieve a specific goal
  34. 1:42let's break this down with some terms
  35. 1:45first we have time this refers to a
  36. 1:49project being a temporary initiative it
  37. 1:52is distinct from normal business
  38. 1:54operations in that it has a
  39. 1:55predetermined start and end date normal
  40. 1:59operations are characterized by the
  41. 2:01routine work in established companies
  42. 2:03think of the day-to-day activities which
  43. 2:06are not very different from one day to
  44. 2:08another the accounting and finance
  45. 2:10department product department sales and
  46. 2:13marketing etc there is no end date
  47. 2:15assigned to these repeating activities
  48. 2:18projects on the other hand have a strict
  49. 2:21expiry date
  50. 2:23then there is the specific goal you wish
  51. 2:26to achieve with the project you can
  52. 2:28think of it as the output of a project
  53. 2:31this output can be a product like
  54. 2:35construct a new office building a
  55. 2:37service like outsource a call center or
  56. 2:40a result such as improve an existing
  57. 2:44business process
  58. 2:46the output together with the work done
  59. 2:48to create it is called project scope the
  60. 2:52scope of each project is unique
  61. 2:55they can be project outputs that are
  62. 2:57similar building an exact same house but
  63. 3:00in a different place for example but the
  64. 3:02fact that the land and location are
  65. 3:04different is enough to change the
  66. 3:06project scope the architects and
  67. 3:08engineers will need to adapt their
  68. 3:10construction accordingly changing the
  69. 3:12way the project work will be done
  70. 3:15if the work and the output are the same
  71. 3:17this will not be a project the scope
  72. 3:20will not be unique and it will be a
  73. 3:22regular business process
  74. 3:25the third key attribute is cost which is
  75. 3:28the resources specifically dedicated to
  76. 3:30accomplishing the goal in mind these
  77. 3:33three attributes form the project
  78. 3:35management triple constraint
  79. 3:39time scope and cost are dependent on
  80. 3:42each other after determining them at the
  81. 3:45start if one of them changes it will
  82. 3:47trigger a change in one or both of the
  83. 3:49others for example let's say that you
  84. 3:52need to pull the end date of your
  85. 3:54project forward to do this you will need
  86. 3:57to either increase your resources input
  87. 3:59by spending more or produce fewer
  88. 4:02products output or perhaps even both
  89. 4:07so this is the general shape of a
  90. 4:09project remember a temporary initiative
  91. 4:13that is agreed planned and executed to
  92. 4:15achieve a specific goal and is worth
  93. 4:19noting that projects are complex
  94. 4:21initiatives going to a new restaurant
  95. 4:24for dinner is also a temporary activity
  96. 4:26with a specific goal in limited budget
  97. 4:28but it's not a project
  98. 4:31it also needs to benefit the business
  99. 4:34through working in conjunction with a
  100. 4:36business strategy which is what we will
  101. 4:39be discussing next thanks for watching
  102. 4:46as I said in the previous lesson a
  103. 4:49project must relate to a business
  104. 4:51strategy but how are the two connected
  105. 4:54and what creates the demand for a
  106. 4:56project in the first place good
  107. 4:59questions
  108. 4:59so let's look into them
  109. 5:02there are a few key triggers that will
  110. 5:04jumpstart a business into executing a
  111. 5:07project there might be a market need
  112. 5:11this is when your company wants to
  113. 5:13develop a product to address their
  114. 5:15client's needs or to keep up with the
  115. 5:17competition for example DTM bank needs
  116. 5:21to develop mobile banking as other banks
  117. 5:24have done but to get there the bank
  118. 5:26needs to manage a complex project with
  119. 5:28various activities like software
  120. 5:31development security financial and
  121. 5:33privacy regulations etc and of course
  122. 5:36all under time and budget constraints
  123. 5:40if you are too late to introduce it you
  124. 5:43risk losing customers
  125. 5:48or there could be a business need during
  126. 5:52the financial crisis for example many
  127. 5:54companies had to execute projects to
  128. 5:56reduce costs optimize processes or
  129. 5:58increase revenues by expanding the
  130. 6:01customer base just to stay in business
  131. 6:04also the demand for a project may arise
  132. 6:07from technological advancement
  133. 6:11technology may advance to the point
  134. 6:13where your business can be automated or
  135. 6:15your products need to change for example
  136. 6:18anything you use your smartphone for
  137. 6:21nowadays paying for things booking a
  138. 6:23taxi even ordering lunch
  139. 6:25surely involved a project
  140. 6:29a project may come as the result of a
  141. 6:32customer request say if a key customer
  142. 6:35requires a tailored service or product
  143. 6:37for example you are a car dealer and
  144. 6:40your biggest client is a taxi company
  145. 6:42and they request making your internal
  146. 6:45systems more compatible with theirs you
  147. 6:48are likely to approve such a project
  148. 6:52or due to legal requirements regulations
  149. 6:56and laws change and the business would
  150. 6:59need to comply social media is a prime
  151. 7:02example where laws and regulations are
  152. 7:05constantly updating as their technology
  153. 7:07and features advance you've probably
  154. 7:09noticed the general data privacy
  155. 7:11regulations introduced in the EU right
  156. 7:13if not just check your email inbox
  157. 7:18they could also be social needs these
  158. 7:21can be anything from digging tunnels to
  159. 7:23extending hospitals to building an
  160. 7:26Eiffel Tower anything that a government
  161. 7:28or organization can do to satisfy a
  162. 7:31social need
  163. 7:34and lastly there are ecological impact
  164. 7:36considerations companies are often
  165. 7:39required and obliged to improve their
  166. 7:41industrial processes to reduce emissions
  167. 7:43many countries have found to only allow
  168. 7:45electric cars on the road by a certain
  169. 7:47year a massive project for car
  170. 7:50manufactures
  171. 7:52see there are many things that can
  172. 7:54create a demand for a project and all
  173. 7:56have to do with the companies or
  174. 7:57organizations wider strategy once a
  175. 8:01strategic goal is defined or a need
  176. 8:03arises the project will be the
  177. 8:05instrument to achieve that goal but
  178. 8:08needs such as the ones mentioned are not
  179. 8:10likely to arrive one by one in a timely
  180. 8:13manner so how does a corporation choose
  181. 8:15which ones take priority and deserve a
  182. 8:17project the demand will require a
  183. 8:20project proposal and the owner of this
  184. 8:23proposal will need to put it to the
  185. 8:25attention of higher management to
  186. 8:26compete for the limited resources of the
  187. 8:28organization
  188. 8:31management will then review the projects
  189. 8:33and decide which ones to execute which
  190. 8:35to discard and which to postpone for a
  191. 8:37later date urgency is a key factor when
  192. 8:41selecting projects say a new regulation
  193. 8:44is imposed which requires your company
  194. 8:46to comply with the latest standards or
  195. 8:48lose their license to work in the
  196. 8:50country you can bet that the Board of
  197. 8:53Directors will prioritize a project that
  198. 8:55resolves this first
  199. 8:58this process is referred to as project
  200. 9:01selection it's an essential task for top
  201. 9:04management they must select the projects
  202. 9:07which bring the most value to the
  203. 9:08company financial and non-financial in
  204. 9:11the eyes of the Board of Directors
  205. 9:14projects are investments they use
  206. 9:16resources again financial and otherwise
  207. 9:19with the objective of seeing a
  208. 9:21worthwhile return for the business
  209. 9:24as you can probably guess several
  210. 9:26projects are usually on the go at the
  211. 9:28same time that said when the Board of
  212. 9:32Directors is presented with possible
  213. 9:34projects they often select several of
  214. 9:36them and add them into a project
  215. 9:37portfolio
  216. 9:39the Board of Directors then dabbles in
  217. 9:42what is called project portfolio
  218. 9:43management this is the process of
  219. 9:46prioritizing projects and the
  220. 9:48administration and control of large sets
  221. 9:50of projects and programs basically the
  222. 9:53objective is to achieve the results and
  223. 9:55combine resources across projects in an
  224. 9:58optimal way
  225. 9:59like we said projects are investments
  226. 10:02and with any investment the preliminary
  227. 10:05analysis needs to be performed with care
  228. 10:08projects consume enormous amounts of
  229. 10:10resources finances time effort and
  230. 10:13attention so if they're not aligned with
  231. 10:16the business strategy then they're a
  232. 10:18massive waste leading to many
  233. 10:20disappointed stakeholders at best and a
  234. 10:22bankrupt business at worst no pressure
  235. 10:26then great next lesson we'll have a look
  236. 10:29at the project manager themselves and
  237. 10:31what their role involves see you there
  238. 10:39great now we know what a project is a
  239. 10:42temporary initiative that is agreed
  240. 10:44planned and executed to achieve a
  241. 10:46specific goal so once we have our
  242. 10:50project and that project has been
  243. 10:52selected by the Board of Directors as
  244. 10:54the current initiative it's down to one
  245. 10:56person to make sure that projects
  246. 10:58execution is successful can you guess
  247. 11:01who that one person is the project
  248. 11:04manager that's who but what exactly is
  249. 11:06their role let's discuss the project
  250. 11:10manager is the CEO of the project they
  251. 11:14will be accountable for the project
  252. 11:16success and for a project to be
  253. 11:18successful it needs to accomplish the
  254. 11:20specific goal of the project within the
  255. 11:22prior agreed time and budget constraints
  256. 11:24everything needs to fit neatly into the
  257. 11:27project management triple constraint
  258. 11:29triangle which we looked at in the first
  259. 11:30lesson remember
  260. 11:33in fact by assuming the project manager
  261. 11:35position for a project the project
  262. 11:37manager implicitly agrees to work within
  263. 11:40these constraints and still meet the
  264. 11:42goal
  265. 11:43now that's a big responsibility what if
  266. 11:47the time frame and budget are
  267. 11:49insufficient a project manager can't
  268. 11:51shoot themselves in the foot and take on
  269. 11:53a project that is unlikely to be
  270. 11:55successful therefore when the project
  271. 11:58management trouble constraints are put
  272. 11:59in place they must be realistic it is
  273. 12:03the project managers duty to assess a
  274. 12:05project and deem the constraints
  275. 12:06practical or otherwise and if otherwise
  276. 12:09they must demonstrate why - whoever
  277. 12:12proposed the project and negotiate for
  278. 12:14additional time resources or an
  279. 12:16adjustment to the goal itself of course
  280. 12:19a project manager is well within their
  281. 12:21rights to refuse to head a project if
  282. 12:23they feel the difference between the set
  283. 12:25constraints and the realistic
  284. 12:26expectations is too large
  285. 12:29in real life however the time and
  286. 12:32resources will usually be just enough to
  287. 12:34complete the goal the project manager's
  288. 12:38job then is to best utilize them and
  289. 12:40this is by no means an easy task and
  290. 12:43often project managers will be
  291. 12:45accountable for multiple projects at the
  292. 12:47same time
  293. 12:49okay so we've been throwing around the
  294. 12:52term accountable but never actually
  295. 12:54defined it what does it mean to be
  296. 12:56accountable
  297. 12:58the formal definition would be to commit
  298. 13:01to achieve a certain result and then
  299. 13:04deliver this commitment simple enough
  300. 13:07but a lot easier said than done
  301. 13:10let's shed light on the magnitude of
  302. 13:13this commitment
  303. 13:15project managers are accountable not
  304. 13:18only for their own tasks but also all
  305. 13:20the tasks that other parties must work
  306. 13:22on and complete this includes the
  307. 13:26project team members support functions
  308. 13:28managers vendors and other stakeholders
  309. 13:31any work that is important for the
  310. 13:33progress of the project to achieve
  311. 13:35successful completion of the project the
  312. 13:38manager needs to have full control and
  313. 13:39visibility on all project related work
  314. 13:42and take actions immediately when
  315. 13:44identifying something is not progressing
  316. 13:46on track they will be on hand to help
  317. 13:48others overcome their barriers and keep
  318. 13:50them motivated all on top of their
  319. 13:53personal daily duties Wow who would be
  320. 13:57crazy or brave enough to take on such
  321. 13:58accountability your friendly
  322. 14:01neighborhood project manager that's who
  323. 14:04but they do have some weapons up their
  324. 14:06sleeve their skills knowledge and
  325. 14:09expertise these will help them make the
  326. 14:12best decisions and direct the work in
  327. 14:14the right direction but more about that
  328. 14:16in the next lesson
  329. 14:23projects encompass many different
  330. 14:26individuals and organizations but the
  331. 14:28project manager is the face of the
  332. 14:30project and the point of contact for any
  333. 14:32questions or concerns about their
  334. 14:34project including all tasks performed by
  335. 14:37other people but just try to imagine
  336. 14:39what project managers deal with they
  337. 14:42need to be able to manage work in which
  338. 14:44they sometimes they don't have any
  339. 14:46experience with they need to also manage
  340. 14:48the experts performing this work and
  341. 14:50ensure they deliver as per expectations
  342. 14:52on top of that they need to successfully
  343. 14:55relate with professionals from all
  344. 14:57levels of seniority from junior team
  345. 15:00members through heads of departments to
  346. 15:02the high level managers like CEOs
  347. 15:05they must own their project and every
  348. 15:07cog working within it they are
  349. 15:10accountable for all of it
  350. 15:11and with that comes the power bestowed
  351. 15:13upon them to make decisions and take
  352. 15:15action
  353. 15:17but what makes them worthy of this power
  354. 15:20their skills knowledge attitude and
  355. 15:23practical experience
  356. 15:26there are countless attributes a project
  357. 15:29manager will have both professional and
  358. 15:31personal what we can do is look at the
  359. 15:34three major skill sets and essential
  360. 15:36qualities within them
  361. 15:39developing these skills and this
  362. 15:41knowledge is not a linear progression
  363. 15:42however think of these skill sets as
  364. 15:45containers each with a tap above them
  365. 15:48and connected by tubes they fill at
  366. 15:50different speeds and in varying orders
  367. 15:52but it's near impossible to fill only
  368. 15:54one don't worry you will see momentarily
  369. 15:58first let's show you the kinds of skills
  370. 16:01and knowledge you will find in each
  371. 16:02container
  372. 16:05the first container to fill contains
  373. 16:07project management and business
  374. 16:09knowledge starting with project manager
  375. 16:12fundamentals leading project work
  376. 16:14addressing project situations and
  377. 16:17knowledge of the project lifecycle then
  378. 16:20you've got planning quality management
  379. 16:22of project critical areas effective
  380. 16:24communication work with project
  381. 16:26management tools and documents topping
  382. 16:29it off with business analysis skills
  383. 16:31business acumen and awareness and
  384. 16:33knowledge of the project manager
  385. 16:35industry standards good news we will
  386. 16:38cover all these key attributes in this
  387. 16:40course you will be set up with a solid
  388. 16:43ground on which to build your future
  389. 16:44experience in projects
  390. 16:47the second container is filled with
  391. 16:50people and workflow management skills
  392. 16:52examples of these are business analysis
  393. 16:55efficient organization of project work
  394. 16:57defining who's responsible and the due
  395. 17:00date issue resolution skills people
  396. 17:03skills working with stakeholders and
  397. 17:05motivating the project team
  398. 17:08good news here too you will experience
  399. 17:11the organizational stakeholder related
  400. 17:13and issues resolution dynamics with this
  401. 17:15course examples and case studies the
  402. 17:19last container has your strategy and
  403. 17:21leadership skills in it some of these
  404. 17:24include negotiation managing the program
  405. 17:26of projects and project portfolio
  406. 17:28working towards the strategic objectives
  407. 17:31of the overall program influencing
  408. 17:33shareholders and promoting the values
  409. 17:35and benefits of the project or program
  410. 17:37to the business strategy
  411. 17:38these more advanced skills usually start
  412. 17:41to grow once a project manager has
  413. 17:43accumulated experience angular connect
  414. 17:45the previously unseen dots
  415. 17:49now let's fill these up it's important
  416. 17:52to remember that this is not a
  417. 17:53definitive order just a rough example to
  418. 17:55show how a project managers skills
  419. 17:57evolve with time and experience
  420. 18:00so starting with the first beaker a
  421. 18:03project manager is likely to gain the
  422. 18:05fundamental knowledge first moving on to
  423. 18:08planning then the second beaker starts
  424. 18:10filling up because they've learned to
  425. 18:12communicate through execution the
  426. 18:15project manager is gaining skills from
  427. 18:17both areas simultaneously
  428. 18:19until there are three beakers filling at
  429. 18:22the same time but maybe the project
  430. 18:25manager wants to focus on strategy and
  431. 18:26leadership so they fill this beaker up
  432. 18:29to influence but then they've just
  433. 18:32learned people skills it's near
  434. 18:34impossible for a project managers to
  435. 18:36stop learning and improve across all
  436. 18:38areas of a project
  437. 18:40whoo that's a lot of skills and tons of
  438. 18:43knowledge but bear in mind that in
  439. 18:46project management not everything comes
  440. 18:48down to skills we could have the
  441. 18:50smartest most skilled project manager in
  442. 18:53the world but if they went around making
  443. 18:55their team cry each week the team would
  444. 18:57get very little done
  445. 18:59the attitude of the project manager and
  446. 19:02of course their professionalism is
  447. 19:03paramount the image of the project is
  448. 19:07another thing the project manager is
  449. 19:08accountable for
  450. 19:10the project manager has got to try a
  451. 19:13little tenderness they must stay
  452. 19:15positive and goal-oriented especially
  453. 19:18during challenging times with so many
  454. 19:21people in organizations involved in a
  455. 19:23project so many expectations and
  456. 19:25constraints if team members see the
  457. 19:28project manager crumbling how can you
  458. 19:30expect them not to
  459. 19:32the project manager must make the right
  460. 19:35decisions and keep the project on the
  461. 19:37path to success
  462. 19:40being a business professional no matter
  463. 19:43the challenges they must show high
  464. 19:45morale strong ethics and solid
  465. 19:47credibility
  466. 19:49right this might sound a little
  467. 19:51overwhelming but a project manager needs
  468. 19:53to cover all these areas but don't worry
  469. 19:56we're going to go through these skill
  470. 19:58areas with you to give you a great
  471. 20:00understanding of our project managers
  472. 20:02responsibilities but first how about a
  473. 20:06brief history lesson
  474. 20:09you
  475. 20:11although different from how we know and
  476. 20:13see it today
  477. 20:14temporary initiatives with a specific
  478. 20:16goal and resource constraints have been
  479. 20:18happening for thousands of years so
  480. 20:20let's take a step back in time and see
  481. 20:22some old school projects
  482. 20:25ancient Egypt can you imagine pitching
  483. 20:29the Great Pyramid of Giza to a board of
  484. 20:31directors as one of seven wonders of the
  485. 20:34world this construction was no doubt a
  486. 20:36massive endeavor with a unique result
  487. 20:39great amounts of materials and workforce
  488. 20:42were employed and it's still unknown
  489. 20:44exactly how the work was organized and
  490. 20:46executed but the planning and management
  491. 20:48was something innovative even for
  492. 20:50today's standards
  493. 20:5315th century this period was all about
  494. 20:57overseas expeditions to find new lands
  495. 21:00and resources one particular project
  496. 21:03manager Christopher Columbus had tough
  497. 21:05times finding the budget for his
  498. 21:07initiative to find a path through the
  499. 21:09West to Asia his budget was three ships
  500. 21:12and a timeline of one year with a
  501. 21:14request of 10% of future revenues from
  502. 21:17any discoveries his business case was
  503. 21:20rejected multiple times by the king of
  504. 21:22Portugal Genoa Venice and even the King
  505. 21:25of England finally he found his sponsor
  506. 21:29though the king and queen of Spain
  507. 21:31Columbus departed in 1492 and made the
  508. 21:35first steps toward the discovery of the
  509. 21:36American continent by Europeans the rest
  510. 21:39his well history
  511. 21:4319th century here comes the Industrial
  512. 21:47Revolution the beginning of the fastest
  513. 21:50technological growth in recorded history
  514. 21:52automation and mass production changed
  515. 21:54the face of Trade and the way industries
  516. 21:56operate economy and society had seen
  517. 21:59nothing like it
  518. 22:01competition started growing and with it
  519. 22:03the better use of time and resources
  520. 22:05employed for given work became much more
  521. 22:07critical 20th century this is when
  522. 22:14project management as we know it really
  523. 22:16came into its own and started developing
  524. 22:18we mentioned that after the Industrial
  525. 22:21Revolution the time and resources were
  526. 22:23more and more limited and using them
  527. 22:25efficiently became absolutely
  528. 22:26fundamental as a result the project
  529. 22:29management field started to develop at a
  530. 22:31much faster pace henry gantt one of the
  531. 22:35forefathers of project management
  532. 22:37created a simple yet ingenious table
  533. 22:39that illustrates activities that need to
  534. 22:41be performed on the vertical axis and a
  535. 22:44time indicator on the horizontal axis
  536. 22:46this was probably the first project
  537. 22:49scheduled it was prominently used during
  538. 22:52World War one to plan and track the
  539. 22:54progress of Navy ship construction we
  540. 22:57will look at this in more detail later
  541. 22:58in the course
  542. 23:00then we have the revolutionary critical
  543. 23:03path method invented by DuPont and
  544. 23:06Remington Rand corporations in the late
  545. 23:071950s the CPM helped project managers
  546. 23:11calculate the fastest way to complete a
  547. 23:13project this is done by analyzing how
  548. 23:16the different activities are linked to
  549. 23:17each other together with the expected
  550. 23:20durations it helps project managers
  551. 23:22identify the best way to sequence the
  552. 23:24activities in their project this will
  553. 23:26also be discussed in greater detail in
  554. 23:28our course
  555. 23:31in the 60s project management was
  556. 23:33established as a profession two
  557. 23:35associations were founded the
  558. 23:37International project management
  559. 23:39association I PMA and a few years later
  560. 23:43the project management institution PMI
  561. 23:46their goal was and still is to develop
  562. 23:49the project management discipline and to
  563. 23:51establish standards best practices tools
  564. 23:53and guidelines
  565. 23:55all of this led to the development of
  566. 23:58innovative project management standards
  567. 24:00and approaches don't worry we will talk
  568. 24:03about them later in great great detail
  569. 24:07and finally welcome to the 21st century
  570. 24:11where businesses have progressed
  571. 24:12technologically and expanded
  572. 24:14geographically like never before
  573. 24:17what is exceptional about today's
  574. 24:20projects is the amount of complexity
  575. 24:22around the desired result you can
  576. 24:24imagine the difference between opening a
  577. 24:26physical store versus an online one
  578. 24:28designed connection speed online
  579. 24:31payments security client data
  580. 24:33regulations customer service and so on
  581. 24:36the activities people and risks to
  582. 24:39consider are so much more in today's
  583. 24:41world and with more demanding projects
  584. 24:44comes a need for a strong project
  585. 24:46manager one who can lead the way through
  586. 24:49complex projects which will inevitably
  587. 24:51determine the life or death of a
  588. 24:53business awesome thanks for watching so
  589. 24:57far we'll now be taking you step-by-step
  590. 25:00through the life cycle of a project
  591. 25:02explaining what to do from beginning to
  592. 25:05end see you there
  593. 25:12right so we've already covered what a
  594. 25:15project is why they're executed what a
  595. 25:18project manager does and the skills they
  596. 25:20have plus a little history lesson just
  597. 25:23for fun
  598. 25:24now it's an appropriate time to go
  599. 25:27through some terminology five terms in
  600. 25:30fact
  601. 25:31we have mentioned most of these already
  602. 25:33but a little more detail never hurt
  603. 25:35anyone unless we're talking about
  604. 25:37tattoos
  605. 25:39and given that as of next lesson we're
  606. 25:42diving straight into the life cycle of a
  607. 25:44project it'll be best to reacquaint
  608. 25:45ourselves of some of these
  609. 25:50one term we haven't mentioned yet is the
  610. 25:53project management office PMO
  611. 25:57this is the name of the department
  612. 25:59responsible for managing coordinating
  613. 26:02and consulting project related work
  614. 26:05in the PMO you will find project and
  615. 26:08program managers project coordinators
  616. 26:10analysts and more all working to ensure
  617. 26:14the projects of the organization are
  618. 26:15properly managed
  619. 26:18the types of PMO will vary in size and
  620. 26:21structure from company to company some
  621. 26:24don't even have a PMO it's usually the
  622. 26:27organizations that are more dynamic and
  623. 26:30changing which require a PMO to govern
  624. 26:32project work companies that work
  625. 26:35predominantly with projects are
  626. 26:36structured in a way they can easily form
  627. 26:38teams to execute projects while
  628. 26:41industrial companies rarely need to
  629. 26:43maintain a significant PMO unit
  630. 26:46for example consulting companies are
  631. 26:49organized almost entirely as a PMO they
  632. 26:53need to be able to easily form project
  633. 26:55teams that are working for different
  634. 26:56clients on the other hand an industrial
  635. 26:59company producing steel for example will
  636. 27:02have well standardized operations that
  637. 27:04would not need to maintain a PMO unit
  638. 27:08the role and importance of a PMO unit
  639. 27:11can also be diverse
  640. 27:14a PMO will have a strategic role if they
  641. 27:17are responsible for project selection
  642. 27:19and project portfolio management or it
  643. 27:21can have a more execution focused role
  644. 27:23when given the responsibility to lead
  645. 27:25the project management the role is to
  646. 27:28assist where the PMO employees help by
  647. 27:31reporting on project progress in keeping
  648. 27:33the project work within established
  649. 27:35standards
  650. 27:38now these other terms we've mentioned
  651. 27:40but to recap and expand
  652. 27:44every project has a project team
  653. 27:48the project team are the experts
  654. 27:50responsible for the execution of the
  655. 27:52work for example developers on a
  656. 27:55software project or designated managers
  657. 27:58coordinators in case of bigger projects
  658. 28:00for example construction workers and the
  659. 28:03responsible supervisor
  660. 28:05in other words everyone who is directly
  661. 28:08working on the project
  662. 28:11these can be from different departments
  663. 28:13and can also include external employees
  664. 28:16or companies and vendors for example
  665. 28:18consultants coaching professionals
  666. 28:20hardware and equipment vendors etc
  667. 28:26actually joint teams are created often
  668. 28:30connecting employees from more than one
  669. 28:32company this is one way to ensure the
  670. 28:35project team has broader expertise and
  671. 28:38the capabilities to deliver a more
  672. 28:39complex project
  673. 28:43in an insurance software project for
  674. 28:45example the IT experts would likely be
  675. 28:48put in a joint team with some insurance
  676. 28:50professionals from the client
  677. 28:52organization to work together and ensure
  678. 28:54the end result is met both from IT and
  679. 28:57from the insurance perspective
  680. 29:01great
  681. 29:02next our project stakeholders all
  682. 29:06individuals or organizations who
  683. 29:08participate in a project can influence
  684. 29:10or are influenced by the project work
  685. 29:12and results
  686. 29:13these can be management customers
  687. 29:16competitors vendors clients and in some
  688. 29:20cases society for things like public
  689. 29:22infrastructure projects for example if a
  690. 29:26new underground line is being
  691. 29:27constructed next to your apartment you
  692. 29:30will be a stakeholder you are influenced
  693. 29:33by the work and in case there are big
  694. 29:35delays you and your neighbors could
  695. 29:37attract media attention to the problem
  696. 29:40in this way you could also influence the
  697. 29:43project work
  698. 29:45it's important to remember that
  699. 29:47stakeholders could influence the project
  700. 29:49work even without being involved in the
  701. 29:52project itself
  702. 29:54and yes the project manager and project
  703. 29:57team are definitely stakeholders too
  704. 30:01program management is the coordinated
  705. 30:04management of multiple projects which
  706. 30:06have similarities similar goal similar
  707. 30:09resources etc by managing them as a
  708. 30:12program the organization gains
  709. 30:14advantages by realizing efficiencies and
  710. 30:17synergies for example if your company
  711. 30:21wants to implement a similar software in
  712. 30:23European branches and each country needs
  713. 30:26a separate project it would be efficient
  714. 30:29to manage it in a program the project
  715. 30:32managers can be helping each other
  716. 30:36and finally project portfolio management
  717. 30:39this is the term that refers to the
  718. 30:42coordinated management of multiple
  719. 30:44programs and projects
  720. 30:46think of a pharmaceutical company in any
  721. 30:50minute
  722. 30:51there are hundreds if not thousands of
  723. 30:53separate research projects for new drugs
  724. 30:55such corporations need strong portfolio
  725. 30:58management to follow this huge work and
  726. 31:01resources awesome thanks for watching so
  727. 31:06far we are about to get to the really
  728. 31:09good stuff really soon we'll be
  729. 31:11discussing the life cycle of a project
  730. 31:14next see you there
  731. 31:23you
  732. 31:25[Music]

About this transcript

This page contains the full transcript of Introduction to Project Management by 365 Financial Analyst, generated from the public captions YouTube serves with the video. The transcript has 4,360 words across 732 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, caption language selection, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.