- 0:02hi and welcome to this
- 0:04video on installation coordination the
- 0:07lightning part
- 0:11so in this video we are going to
- 0:14see how to perform an insulation
- 0:16coordination
- 0:17in emtp and especially
- 0:20and focus of course on the lightning
- 0:25so before watching this video i highly
- 0:28recommend you to take a look
- 0:29at the other recorded video which is
- 0:31called
- 0:32origin and classification of
- 0:34overvoltages
- 0:36i will do some reminders
- 0:39here but to fully understand the content
- 0:42of this video it's
- 0:43highly recommended to watch this this
- 0:45first one
- 0:47okay so well first of all if you uh
- 0:51the first reminder actually from this
- 0:52video it's about
- 0:54the different type of overvoltages there
- 0:57are like
- 0:59very fast transients over voltages which
- 1:03are actually the fastest then you have
- 1:05the fast front over voltage
- 1:07which are lightning over voltages you
- 1:09have switching
- 1:10over voltages and temporary overvoltages
- 1:14which are
- 1:15the slowest like typically a fundamental
- 1:18frequency over voltage like a single
- 1:20phase ground fault or
- 1:22load rejection for resonance
- 1:25why it is important again to repeat what
- 1:28is important to
- 1:30classify those over voltages it's
- 1:32because
- 1:33an apparatus will
- 1:36waste them a certain level according to
- 1:40the shape of your voltage
- 1:43for lightning or voltage the
- 1:46the surge is very steep and so you will
- 1:49have
- 1:49here the time from zero to peak which is
- 1:52very short
- 1:53in this condition the apparatus will
- 1:56withstand
- 1:57and higher over voltage compared to
- 2:01a switching over voltage where the time
- 2:03to peak is much
- 2:04slower and so it means that the maximum
- 2:07level
- 2:08which for lightning is called a bil
- 2:11basic impulse level the
- 2:15this level is higher than for a
- 2:18switching level
- 2:21okay so here you can see approximately
- 2:23the dynamic of this
- 2:24search for lightning the classification
- 2:28so basically when we are going to do a
- 2:30an analysis
- 2:32we do a simulation or even if you have
- 2:35something
- 2:36a real lightning strike on field
- 2:39we kind of assume that the shape of the
- 2:42overvoltage
- 2:43we will have will be close enough
- 2:47to the lab test all equipment
- 2:50are doing all the tests
- 2:53and equipment have passed through and so
- 2:56that the level
- 2:57uh the bil which was obtained by lab
- 3:00measurements
- 3:01to determine the bil we assume that
- 3:04for the any shape of lightning strike we
- 3:07will get
- 3:08during the simulation or on field will
- 3:10be similar and so the same level
- 3:12can be assumed
- 3:17okay so uh there are several type of
- 3:21lightning over voltages uh first of all
- 3:23you have the induced overvoltage
- 3:25and this is mostly uh this mostly
- 3:28affects
- 3:29the distribution network it's when the
- 3:30lightning strike does not strike
- 3:32directly the line but something close by
- 3:35and you have an overvoltage on the line
- 3:39for that there are some tools actually
- 3:40we have one here which is called earlier
- 3:43liov which is used in this purpose but
- 3:47that's not what we're going to do today
- 3:50then you have what is called
- 3:53the lightning strike so when the
- 3:56lightning strike
- 3:57on a shield wire so you have the tower
- 4:00and at the top you have two ground wire
- 4:01which are called a chill wire
- 4:03those are designed to capture lightning
- 4:07and so you may have over voltages when
- 4:09the voltage rises
- 4:10so high on those chill wire that you
- 4:13have
- 4:14a flash over between the ground and the
- 4:17face
- 4:17and because it is because between the
- 4:19ground and the face it's called a back
- 4:21flashover
- 4:22and so that's typically what we study
- 4:24when we do empty simulation mtp
- 4:27simulations or
- 4:28we study this case the backlash we also
- 4:31will apply
- 4:31a lightning strike on the tower top
- 4:34on the chill wire
- 4:38in some region of the world where the
- 4:42the lightning density isn't so high
- 4:45um it's not economic it doesn't make
- 4:47sense economically to
- 4:49put those shielding wires or to
- 4:52perfectly protect a line very often you
- 4:54will need two chilling wires
- 4:56so often you will put only one or none
- 4:58according to
- 5:00again some economical uh consideration
- 5:04and if you don't have so many lightnings
- 5:06on the region and so in this case it may
- 5:08happen that the lightning strikes
- 5:10straight on a phase without striking
- 5:14the shielding this is cause this is
- 5:16called a direct strike or
- 5:18shielding failure so this is also
- 5:20something you have to study in emtp and
- 5:22make sure
- 5:23the overvoltage
- 5:26there is no too bad of a voltage for
- 5:28that
- 5:30typically we don't study lightning
- 5:33tracking inside the substation
- 5:35because we assume that the substation is
- 5:37protected and you have lightning mass
- 5:38which will capture the lightning
- 5:40and so the electrical operators are
- 5:43safe inside the substation so when you
- 5:46do the emtp simulation
- 5:47you have a device which is a lightning
- 5:50strike which we will see later in the
- 5:52video which is a current source
- 5:53you will connect this current source on
- 5:56the incoming transmission lines but not
- 5:58inside the substation
- 6:02so the objective of any mtp study here
- 6:06there will be several things if you talk
- 6:08about transmission line itself
- 6:10you will come out with what is called
- 6:11the line performance
- 6:13which is the flash over rate of an
- 6:16overhead line
- 6:17okay you have a transmission line how
- 6:19often
- 6:20you will have a back flashover or
- 6:23shielding failure
- 6:26and so this is typically like a number
- 6:28ones per
- 6:29100 year 200 years and so on
- 6:32it can be much less or much more so this
- 6:35is for transmission lines
- 6:37and then if you talk about equipment
- 6:40inside substations now we are going to
- 6:42determine the rate of failure
- 6:46if you have so the first step will be
- 6:47you will have a back flash over on the
- 6:49line
- 6:49and then this back flashover will create
- 6:51an overvoltage on
- 6:53phases which will propagate to the
- 6:55substation and may damage
- 6:57equipment okay so there we will see in
- 7:00this
- 7:01video the procedure to determine that
- 7:04and finally it's also to determine uh
- 7:06the survivor ratings
- 7:08um so the switching the lightning
- 7:14surge
- 7:16the impulse level of the the third
- 7:19arrestor but also the position of the
- 7:21sort arrester
- 7:22and this is crucial for lightning um
- 7:26one thing you have to remember which is
- 7:28important is that for lightning
- 7:30the substation is actually a circuit and
- 7:32you don't assume that the voltage is the
- 7:34same at each point in the substation
- 7:36which means that if you have a
- 7:38substation connected to a transformer
- 7:39but there is a conductor in between
- 7:41during a lightning strike the voltage at
- 7:45the
- 7:45at the point of connection of the third
- 7:47arrestor will not be the same as the one
- 7:49of the point of connection of the
- 7:51transformer because the lightning strike
- 7:52travels through the
- 7:53station propagates through the
- 7:56substation
- 7:58all right so some definitions many of
- 8:00them i've already discussed
- 8:02uh so you have the first thing which is
- 8:04called a direct lightning strike
- 8:06so it's when the lightning strike
- 8:08directly on the face
- 8:10of the transmission line without hitting
- 8:12the shielding wire
- 8:15the back flashover it's a flashover
- 8:17between
- 8:18ground and phase so when the lightning
- 8:20strike
- 8:21the neutral wire the top of the tower
- 8:24and you have
- 8:25i mean at the top of the tower or in
- 8:27between it doesn't matter
- 8:29um you will have the flash so you the
- 8:31voltage will rise
- 8:32then the voltage difference between the
- 8:35ground and the phase wire will be high
- 8:37and you will have a flashlight
- 8:38between so this is a backlash then you
- 8:41have the back flashover rate
- 8:43which is the number of back flashover of
- 8:45the line
- 8:46per 100 kilometers so you take a section
- 8:49of line
- 8:50per year so this will depend on the on
- 8:52the tower geometry
- 8:54and on the ground density of lightning
- 8:57in the region the grounds of like
- 8:59the ground density is how often you get
- 9:02lightning strikes
- 9:03for example if you are in uh you know in
- 9:06the
- 9:07louisiana region in the u.s here you
- 9:09have a very high lightning
- 9:11lightning strike ground density whereas
- 9:14if you are
- 9:15more up north you know in the west coast
- 9:17of canada it's much
- 9:20lower
- 9:22okay then we will see together how to
- 9:24determine what is called the critical
- 9:26current
- 9:27the critical current it's when you will
- 9:29apply a lightning strike during the
- 9:30simulation
- 9:31on at a certain point on the incoming
- 9:34line so typically you will have the
- 9:35substation
- 9:36all the incoming line the incoming line
- 9:39and you will put the lighting strike
- 9:41closed uh on the line close by the
- 9:44substation
- 9:45within few miles or even less you know
- 9:47hundreds of
- 9:48meters or miles you will put the
- 9:51lightning strikes here
- 9:53and the critical current will be the
- 9:55minimum
- 9:57peak current of this lightning strike
- 9:59which will
- 10:00cause a failure in the substation
- 10:04so for that you will have to know of
- 10:06course the wisdom label
- 10:08of all equipment which are called the
- 10:11bil
- 10:12the basic lightning impulse insulation
- 10:16level
- 10:18so you will need to know those values
- 10:20simulate the lightning strike monitor
- 10:22the voltage
- 10:23at at each point in the substation and
- 10:27see if the voltage reach
- 10:28this maximum level and if it's the case
- 10:31then
- 10:31you are above the critical current and
- 10:34so it will be
- 10:35we will run several simulations in order
- 10:37to determine the critical current at
- 10:39each point
- 10:40of the of this incoming
- 10:45actually line some point when you go
- 10:46further and further away from the
- 10:48substation
- 10:48this critical current become very high
- 10:50it can be more than 200 kilo amps
- 10:54at some point when it's over 200
- 10:56kilometers we
- 10:58are going to standard we assume that
- 11:00it's not possible anymore
- 11:02and so that's that means that such a
- 11:04lightning strike does not exist it's too
- 11:06high
- 11:06or it's uh the probability is much too
- 11:09low so you
- 11:10you you will say that at this point no
- 11:12lightning would
- 11:14uh no no lightning would create the
- 11:17damage in the substation
- 11:18and this this points this uh
- 11:21distance from the substation to
- 11:24on the line where you have you reach a
- 11:27critical current of 200 kilo amps
- 11:29it's called the critical distance we
- 11:32will see that uh
- 11:33earlier okay so we discussed here the
- 11:37bil the bsl
- 11:39um so the bil the definition is
- 11:42um it give a probability of
- 11:46the wisdom probability of 90 percent
- 11:50however you will see for if you watch
- 11:53the video of the switching
- 11:54insulation coordination it's a little
- 11:56different for lightning
- 11:58because basically the the level of
- 12:00lightning for
- 12:01the difference between ninety percent of
- 12:04winston and fifty percent of wisdom it's
- 12:05almost nothing
- 12:07and so typically for lightning because
- 12:09the statistical distribution of the
- 12:11width and voltage is so narrow
- 12:14even for internal or external insulation
- 12:17we will use
- 12:21just one a single level which will be
- 12:24the level to design or design
- 12:26and if you get an overvoltage above this
- 12:27level then
- 12:29you get you get a damage and all
- 12:32flash of backlash so it will be a bit
- 12:36easier than
- 12:37compared to switching where you have
- 12:39some equipment like insulators which are
- 12:41called non-self-restoring insulation
- 12:45and which have a which has a statistical
- 12:47behavior and forced us to
- 12:49cross different statistical roles
- 12:54okay so the limit distance is actually
- 12:56what i call before the critical distance
- 12:58i apologize the real name is limit
- 12:59distance
- 13:00so again this is when you apply
- 13:03lightning strikes on the line
- 13:05you find the critical distance and at
- 13:07some point
- 13:08the the critical current will be higher
- 13:10than 200 kilo amps so this is
- 13:13this point here is the limit distance we
- 13:14will repeat that again
- 13:17later to make sure it's clear
- 13:22okay so then you have what is called the
- 13:23maximum shielding
- 13:25current uh we will we will discuss
- 13:29what is the max maximum chilling current
- 13:31in the next slides
- 13:34just a quick introduction to that when
- 13:36you will see you have
- 13:37your phase conductor where they get
- 13:39protected by a shielding current
- 13:42and you will see the theory but
- 13:45the bottom line is for low
- 13:50lightning currents you are more likely
- 13:52to get a chilling failure than for
- 13:54a high lightning current and actually
- 13:57when the lightning current is very high
- 13:59you most of them you don't have shading
- 14:02failure
- 14:03and so the limit between that is the
- 14:04maximum shielding current it's the
- 14:06highest magnitude of lightning current
- 14:08which may cause a shielding failure
- 14:11so we will see the theory right after so
- 14:13don't worry if it's not so clear
- 14:24all right then you have the
- 14:25representative lightning stroke current
- 14:27which is the
- 14:28minimum value of lightning current at
- 14:30specific point of impact which produces
- 14:33over voltages that the equipment has to
- 14:35withstand
- 14:39right so then like i said you will do
- 14:42this study and you will
- 14:43come out with some line performance
- 14:46or so for line performance the outcome
- 14:49of the study will be the number of flash
- 14:51over
- 14:52per 100 kilometers and per year then for
- 14:55substation it will be
- 14:57the mean time between failure and so you
- 14:59have here some
- 15:00typical performance criterion here for
- 15:04ehv and hd system or here for
- 15:07different type of substation of course
- 15:10of course here there is an economical
- 15:12problem
- 15:13uh like it's a trailer between
- 15:15economical concern
- 15:17and failures um in order to increase
- 15:20the mean time between failure and the
- 15:22substation either
- 15:23you get equipment with higher bil
- 15:27which costs of course more which are
- 15:29more expensive
- 15:30or you put more surge arresters
- 15:33or you change the tower design so all
- 15:36that doesn't cost
- 15:37when you have one failure every 500
- 15:40years
- 15:41you know that's why you made me wonder
- 15:43why would i spend more money on that so
- 15:44it's really like a trade-off between
- 15:47economical concern and
- 15:52design
- 15:55okay so again how we are going to
- 15:59do that in the mtp so the first step
- 16:00will be to model completely the design
- 16:03so let's take a simple example where we
- 16:05have one substation with one incoming
- 16:07line
- 16:08so we are going to
- 16:12place a lightning strike
- 16:15for current source at the top of this
- 16:17line and at several points going further
- 16:19and further away
- 16:20for each point where we apply this
- 16:23current source
- 16:24we will we will vary
- 16:27the um the current the
- 16:30lightning strike peak current so we'll
- 16:33vary it in order to find
- 16:35the limit between failure or no failure
- 16:38if i have a peak current lower than this
- 16:42point i have no failure if i have a
- 16:43bigger
- 16:44higher than this point i have a failure
- 16:46so that's again the critical current
- 16:48you will be supposed to do that at each
- 16:50point on the line but of course to
- 16:52simplify it what we're going to do is to
- 16:53cut the line into section
- 16:56um very often what is done is we do that
- 16:58at each tower top
- 17:00but it's also common to do it at the
- 17:02tower top and at the middle of the line
- 17:04and so that's how you will
- 17:05sectionalize your line and apply the
- 17:08lightning strikes
- 17:09just because you cannot apply
- 17:10continuously it will be much
- 17:12way too much cases and it's not so
- 17:16relevant
- 17:18okay so after the mtp study you will
- 17:20have the critical
- 17:21current at each tower
- 17:25so
- 17:29if you if you do actually lightning on
- 17:31the cable system
- 17:32so of course the lightning will not
- 17:33strike the cable system but
- 17:35it may for example strike on the
- 17:37overhead line and then propagate
- 17:39through the cable system through um
- 17:42or through transformers or in this case
- 17:45it's the voltage between sheets and
- 17:47ground which
- 17:48which may cause the the flashover you
- 17:51may want to monitor also the arrestor
- 17:53energy
- 17:53so that's all the outputs of any of the
- 17:57mtp simulation
- 18:02okay so the lightning the lighting we
- 18:05have different lighting model in mtp
- 18:08the one recommended by standard is the
- 18:10sea gray model
- 18:12so the secret model has a certain shape
- 18:14um
- 18:15some people do studies with double
- 18:18exponential
- 18:19um it's not necessarily recommended to
- 18:21use that because
- 18:23um double exponentials are actually the
- 18:26the the surge the current surge which i
- 18:29use for testing
- 18:31uh but uh according to c grade iec
- 18:34it's recommended to use this remodel for
- 18:37lightning strike but
- 18:38both can be used the two models are they
- 18:40are here in the entp
- 18:45okay so now um
- 18:51okay so now let's discuss a little bit
- 18:53the tower geometry
- 18:55so remember i in the introduction i
- 18:58explained that
- 19:00when you have a lightning strike
- 19:01according to the lightning intensity
- 19:04you may hit the chilling wire or the
- 19:07phase and when you have a lower um
- 19:11low intensity you're more likely to hit
- 19:14the the face and have a shielding
- 19:17failure
- 19:18so why is that well it's because
- 19:21when you have a conductor or
- 19:24any metal metallic structure which is a
- 19:28conductor
- 19:29you have an attractive radius the
- 19:32attractive radius is
- 19:33a radius if a lightning strike enter it
- 19:37the lightning strike will end up on the
- 19:39metallic structure
- 19:41so having this uh chilling wire or
- 19:44sometimes you have two i think those
- 19:46create kind of like a cylinder
- 19:48over the line and if the lightning
- 19:50strike until the cylinder
- 19:52it goes into the shielding wire and this
- 19:56circle this uh attractive radius
- 19:59depends on the the lightning current
- 20:03intensity
- 20:04and so for low intensity
- 20:08for low intensity lightning strike you
- 20:10will have a smaller radius
- 20:12whereas for high intensity lightning
- 20:14strike you have a very large radius
- 20:16and that's why this large radius of the
- 20:18on the conductors at the top of the
- 20:20tower we basically cover the entire line
- 20:22and protect
- 20:23completely the line i will show you a
- 20:24drawing after which will
- 20:26and repeat the explanation
- 20:41okay so then the the so the lightning
- 20:44distance
- 20:45is the distance between an object on
- 20:47earth and a lightning
- 20:48leader within which the lightning
- 20:51must approach before the
- 20:55point of strike is determined
- 20:59and so for this um for for this
- 21:03attractive radius you have several
- 21:04models that exist in the literature
- 21:07um some of them depend on the current
- 21:10some of them depend also on the height
- 21:12so it may depend on both height and
- 21:15current
- 21:19okay so those are important factors to
- 21:21consider when the tower will be designed
- 21:23and
- 21:23determine again the the
- 21:26the mean time between failure underlying
- 21:28performance
- 21:32so also if the goal is to determine
- 21:36how much lightning is going to strike
- 21:38your line okay so
- 21:40try to imagine to see a single the line
- 21:43from the top you have the
- 21:44chili wires and those ceiling wires
- 21:47create
- 21:48a cylinder an attractive radius so a big
- 21:51cylinder
- 21:52and when you know the regional brand
- 21:53density so how much lightning strikes
- 21:56per year
- 21:57and you see this the ground cover
- 22:00from this line and seeing from the top
- 22:02that's how you can calculate how many
- 22:04lightning will strike your line per year
- 22:06and of course this will depend again on
- 22:08the lighting density because the
- 22:09lightning density will unlock
- 22:11the larger radius
- 22:16okay so let's put a drawing behind all
- 22:17that so it's easier to understand
- 22:20here you have your transmission line
- 22:22with phase a
- 22:23b and c here you have two chilling wires
- 22:28then you have here your attracted ray
- 22:31attractive radius
- 22:33okay so you see the attractive radius
- 22:36here you have
- 22:37the equation which is yours actually
- 22:39which will be used here for the
- 22:41for the webinar today which is the ritz
- 22:43from april
- 22:44and this one depends on the height and
- 22:47the current
- 22:49okay so assume any lightning strike for
- 22:52example 100
- 22:53amps lightning strike so you have i you
- 22:56have the tau the height of this
- 22:57conductor and that's how you calculate
- 22:59the radius
- 23:00then you have this radius here you do
- 23:02the same thing called the second shield
- 23:04wire
- 23:05and you have this second radius here do
- 23:07the same thing for the phase
- 23:09and you have here the radius around the
- 23:10face
- 23:12for a low current here you see that you
- 23:14will have a possibility
- 23:15the lightning lightning leader is coming
- 23:17from the top here of course coming from
- 23:19the top
- 23:20if it enters this zone which is the
- 23:22striking distance
- 23:23it will end up in the on the conductor
- 23:26whereas if you enter this zone it will
- 23:29end up there
- 23:30and if the lighting and density is very
- 23:32high
- 23:33rc is going to increase and so here b
- 23:36will end up coming in top of a
- 23:39and so then you will have no chance for
- 23:41any lightning
- 23:42to go to uh to go on the on the face and
- 23:45so you will have no chilling failure
- 23:49okay so this is called the um
- 23:53whatever all right so yes so that's um
- 23:58on the geometry point of view so that's
- 23:59what is in poland so in a
- 24:01in a country where i don't have so much
- 24:03ground uh
- 24:04while you have a very low height where
- 24:07you have a very low
- 24:09um ground density of lightning
- 24:12you will have only one chili wire at the
- 24:14in the middle
- 24:15and so basically if you have a very high
- 24:17lighting strike you will have very
- 24:19large radius which will protect your
- 24:20line but for lower
- 24:23level of lightning strike sometimes you
- 24:26will have chilling failure but it's okay
- 24:27because a
- 24:28lower level of lightning intensity and
- 24:31so they may not cause a damage
- 24:33that's the whole point of doing the
- 24:34study here
- 24:44okay so if if we repeat a little bit the
- 24:47procedure here
- 24:49and for that i will pop a
- 24:52an emtp example
- 24:56okay so here you have a simplified model
- 24:58of substation and we come back to that
- 25:01we never apply a lightning strike on the
- 25:03substation because we assume the
- 25:04substation is protected by
- 25:07lightning mass tents which will capture
- 25:09every lightning possible
- 25:11trying to strike the substation so what
- 25:13here
- 25:14that is the end of the substation on
- 25:15this side and so we this tower is still
- 25:18protected in the substation
- 25:19so we start applying lightning strike on
- 25:22the line
- 25:24here in our case we will try to apply on
- 25:26each tower so here you see three
- 25:28lightning strikes but it's actually one
- 25:29after the other
- 25:30so let first so we can forget those two
- 25:33here and actually delete them so first
- 25:37we
- 25:38we apply on the first hour we vary the
- 25:41intensity
- 25:42so we have no failure in here so we
- 25:45monitor the voltage
- 25:47uh if the overvoltage during the
- 25:48simulation remain below the bils it
- 25:50means there is no failure if it goes
- 25:52above there is a failure it means there
- 25:53is a failure
- 25:54so we'll vary for example for this point
- 25:57we will get
- 25:5875 kilo amps for failures
- 26:01but so if this is the limit if i apply a
- 26:04lightning strike below 75
- 26:06there is no failure and if i apply a
- 26:09lightning strike above
- 26:1175 there is a failure now it means 75 is
- 26:15my critical current
- 26:17then i go and i will assume it's the
- 26:19same critical current for all
- 26:20this section for the line here and for
- 26:22half the line here
- 26:24then i will place this lightning strike
- 26:27on the next
- 26:28next hour and do the same thing because
- 26:31i'm further away
- 26:32here now the like the um the critical
- 26:35current will be a bit higher
- 26:36maybe 100 and i would assume it's the
- 26:39same critical current for all that
- 26:41if you don't like this assumption you're
- 26:43free to apply the lightning in between
- 26:45and cut this line into section and apply
- 26:48the lighting in between
- 26:49and i will go like that step by step
- 26:51until the critical current is above 200
- 26:54kilo amps
- 26:54then like we said we assume this is a
- 26:58case which has
- 26:58the probability which is too low to be
- 27:01considered and so
- 27:02now we have our critical distance so for
- 27:05example let's assume
- 27:06here the critical current is 210
- 27:10okay then it means we don't consider
- 27:12this tower and
- 27:14the critical distance will be the length
- 27:16of all those sections those spans
- 27:18up to this half line
- 27:22okay so that will be the first step to
- 27:23find the critical current at each point
- 27:26then what do you do with that
- 27:30then you determine the number of
- 27:31children failure
- 27:33so it will depend of several things the
- 27:35ground
- 27:36density the what we call here
- 27:41in ng the regional ground flash density
- 27:45multiplied by l1 l1
- 27:48is the length of the line so the total
- 27:52length of the line
- 27:53and um gc is
- 27:56the exposure distance here actually i
- 28:00sorry i wasn't so cute and i got decided
- 28:03myself as well
- 28:04here what in this slide what we show is
- 28:06how to determine the shielding failure
- 28:09so the changing failure the goal here is
- 28:12to find
- 28:13the maximum current which may create
- 28:16achieving failure
- 28:18okay so you understand that as you
- 28:19higher i
- 28:22the the radius here increases and at
- 28:24some point d
- 28:25becomes zero so that's the goal here is
- 28:27to find
- 28:29what is the maximum current which may
- 28:31create a
- 28:32shielding failure so that's how we do
- 28:34that
- 28:35we find um we calculate basically here
- 28:41the the limits so the limit will be i m
- 28:45i am for which there is no d
- 28:48equals zero and then we'll do an
- 28:50integral of
- 28:52the length of the line multiply by d
- 28:55which is here multiply by two of course
- 28:58because it's
- 29:00two sides and um
- 29:03and then the uh the so the lens
- 29:06d multiplied by two and the ground
- 29:08density so you have this equation here
- 29:10you do the integral from
- 29:13the critical current to
- 29:17the critical current to the maximum
- 29:19chilling failure and that's how you get
- 29:21the shielding failure rate
- 29:24okay so the critical current is
- 29:26calculated
- 29:27um it's calculated by emtp so you get
- 29:31those critical current the way we
- 29:32explained
- 29:34and you can do that for the line the
- 29:36critical current here
- 29:37will depend on the section so you may do
- 29:40this per section and get the chilling
- 29:42failure
- 29:42per section and add them up together
- 29:48as a if you if you'd like to
- 29:51simplify your life you may also here
- 29:54calculate
- 29:55the chilling current like that if you
- 29:57know the third impedance of the line
- 29:59you may calculate here you may just use
- 30:03this calculation and
- 30:04without doing the simulation in empty
- 30:08here when we determine the shielding
- 30:10failure it's actually for the line
- 30:12performance
- 30:13so that's why in this calculation we
- 30:15don't reconsider the substation
- 30:17we consider u50 which is the critical
- 30:21flash over the critical flash over
- 30:23voltage of the line
- 30:25and so we just assume the failure on the
- 30:27line okay so when you
- 30:29have this chilling failure rate you only
- 30:31focus on the line
- 30:33then the goal is to focus on the
- 30:34substation you
- 30:36consider the critical current
- 30:40of which will create the flashover in
- 30:42the substation
- 30:46okay so here by design if you want
- 30:48perfect shielding then you have to set
- 30:51here the critical current equal to i m
- 30:53or
- 30:54you have to as um you have to arrange
- 30:57the geometry of the line so i
- 30:58am which is the value of intensity
- 31:02where d is zero to make sure that
- 31:06i am equal i c
- 31:17all right so now let's quickly discuss
- 31:19how to
- 31:20model everything in emtp so first of all
- 31:24a lightning study is something very
- 31:27local
- 31:28because it is local
- 31:31you don't need to model the entire
- 31:34system of the country to study lightning
- 31:37it's mostly you will
- 31:41you will model everything in the radius
- 31:44of a few miles or few kilometers
- 31:46close to the substation where you want
- 31:48to analyze lightning
- 31:50so if we take a look quickly here at an
- 31:52empty model
- 31:54you have the substation here we assume
- 31:55there is only one incoming line to
- 31:57have a simplified case but in reality
- 31:59you may have zero
- 32:00and you see here we have several steps
- 32:04and at some point we don't model anymore
- 32:08when we stop modeling there is one thing
- 32:11important to do
- 32:12when you apply your lightning on the
- 32:14tower for example let's say here you
- 32:16move this lightning and you put it
- 32:20at this point when you apply the
- 32:24lightning you know the lightning strike
- 32:25will create
- 32:26a search a search voltage the search
- 32:29voltage will travel through the line and
- 32:31reflect
- 32:32of course here if you stop modeling here
- 32:35you have to make sure when you play the
- 32:36lightning strike that it doesn't come
- 32:38here and
- 32:39come back that it doesn't go here and
- 32:40come back so what we typically do for
- 32:43that
- 32:44is we will here put a section of
- 32:47transmission line which is
- 32:49long enough so the lightning never comes
- 32:51back
- 32:52so typically you will put 50 kilometers
- 32:54or 20 kilometers and that should be
- 32:56enough
- 32:57the second strategy is to use a negative
- 32:59voltage source with
- 33:00an impedance which is equal to the surge
- 33:04impedance of the line
- 33:06but again to simplify in my opinion the
- 33:08easiest is to take the same transmission
- 33:10line here but
- 33:11generate it for a very long uh
- 33:14a very long section of 20 or 50
- 33:17kilometers
- 33:18and when so when you do the simulation
- 33:20the lightning strikes goes there and
- 33:22never have time to come back before the
- 33:23end of the simulation
- 33:26okay so that's how you will model
- 33:27boundaries in your system
- 33:29uh you put an ideal voltage source
- 33:33it's a good idea also to adjust here the
- 33:36phase
- 33:36angle to get worse case right so
- 33:39basically
- 33:40when you do the simulation uh you do one
- 33:43simulation and you
- 33:44you adjust your voltage source to get
- 33:46the maximum
- 33:47overvoltage in the substation and then
- 33:49you keep them like this
- 33:53so this is something you do at the
- 33:54beginning then once you have determined
- 33:56what's the worst case
- 33:58you just keep it like that
- 34:07all right then the for transmission
- 34:09lines um
- 34:10it's recommended to use a frequency
- 34:12dependent model or even better white
- 34:14damp models
- 34:15so i to uh to model them i don't go too
- 34:18much into detail we have specific videos
- 34:20on how to create transmission lines
- 34:23one thing here is that you see we model
- 34:25each span
- 34:26individually so you have
- 34:29so typically for a switching study or
- 34:33other type of study with modeled
- 34:34entire line in one device
- 34:38but here it's really each section so you
- 34:40will have
- 34:41the three phases and the chilling wires
- 34:44in this example we have only one shield
- 34:45wire
- 34:46you see it's here number one and then
- 34:48you have phase a b
- 34:49and c and so we repeat this section
- 34:53several times
- 34:54so that's how you do that then you also
- 34:56need to model the tower
- 34:58we'll come back on the tower model later
- 35:00but we will have to do it
- 35:02basically for that we use a lossless
- 35:05propagation line
- 35:07with a footing resistance we'll see
- 35:08after which is a cp model
- 35:12very often actually when you try to
- 35:14create a frequency dependent model
- 35:16or a wideband model for a very short
- 35:18section of line so one span which is you
- 35:20know 100 meters or so
- 35:22or sometimes more sometimes often it's
- 35:25very tough
- 35:26for the frequency dependent algorithm to
- 35:28fit that
- 35:29and you it may not be able to fit it or
- 35:32may require
- 35:33a very very high number of poles to do
- 35:35that and create numerical problems
- 35:38if that happens one thing that can be
- 35:39done is instead of
- 35:41generating a frequency dependent model
- 35:43of line you enter all the power
- 35:45configurations so the position of each
- 35:47conductor
- 35:48on space and all that but instead of the
- 35:51running the fd you generate
- 35:52a constant parameter line and you
- 35:56generate that for uh 50 kilohertz
- 36:00so the parameters resistance and
- 36:01backhands capacitance are
- 36:03evaluated for 50 kilohertz
- 36:07it's it's okay in one sense because i
- 36:09mean it's trying to work like that
- 36:11because the lightning strike is
- 36:12very high frequency the other frequency
- 36:15presents during the study is the syst
- 36:17the 60 hertz or 50 hertz frequency which
- 36:20for such a speed it looks like a dc
- 36:23voltage in here so that's why it's fine
- 36:25to do that
- 36:28if you study if the if you want to be
- 36:31very precise
- 36:32you may also model the corona effect
- 36:36the corona effect will give a capacitive
- 36:40behavior to your line which will
- 36:43lower the stiffness of the
- 36:46of the overvoltage so it's a good idea
- 36:48to use that if you want to be precise
- 36:50especially for very high voltage
- 36:52if you don't you will be conservative so
- 36:54it's fine as well
- 36:58okay so for air gap it's uh it's
- 37:01important to model the air gap
- 37:03of course because that's what will
- 37:04create the
- 37:06the flashover so when the air gap is
- 37:09short
- 37:10you can assume that as soon as there is
- 37:12a
- 37:13flashover it's like an ideal switch
- 37:16closing
- 37:17whereas if it's a long air gap more than
- 37:19one meter then it's
- 37:21important to reproduce the leader
- 37:22propagation which we add more delay and
- 37:25add an impedance to this
- 37:26arc
- 37:30okay now how do we model the substation
- 37:33itself
- 37:34everything must be modeled basically
- 37:36each section of conductor
- 37:38must be modeled if it's more than 10
- 37:40meters
- 37:41so approximately 30 feet then you should
- 37:44use a cp line
- 37:46so for the cp line we will enter the
- 37:48characteristic impedance
- 37:50and the length of this line then you can
- 37:53assume
- 37:54a traveling wave
- 37:57the propagation speed
- 38:01of about 80 of the speed of light
- 38:06this is for air insulated substation for
- 38:08gas insulated substation it may be
- 38:10slightly different
- 38:14then if you have a conductor shorter
- 38:16than that
- 38:17then simply use a pendant
- 38:20with a typical value of one micro henry
- 38:23per meter
- 38:26for gis typically the
- 38:30surge impedance is about 60 to 80 ohm
- 38:34for those sections of line whereas for
- 38:36air insulated substation it could be 150
- 38:38200
- 38:42then you have to place the surge
- 38:44capacitance of
- 38:45every single equipment if you have a bus
- 38:48bar
- 38:48you have to put the street capacity of a
- 38:50transformer a
- 38:52ct open breaker or clothes breaker
- 38:56every single equipment has to be
- 38:57represented by a three capacitance
- 39:00you can find typical value of three
- 39:01capacitance in is standard
- 39:04we actually have a device which is
- 39:06called a stray capacitance which is a
- 39:08library
- 39:09database or stray capacitance so you can
- 39:11use this device as well
- 39:16okay so it's the same for transformers
- 39:19to
- 39:19it's possible actually to be even more
- 39:21precise for transformer and to use
- 39:23a high frequency model of transformer
- 39:26so if you have done a frequency test
- 39:28where the
- 39:29the open circuit impedance of the
- 39:32transformer is measured for a wide range
- 39:34of frequencies
- 39:35then you may get this impedance data
- 39:37impedance that source frequency and
- 39:39create
- 39:40a frequency dependence impedance to
- 39:42reproduce
- 39:43your transformer so that's uh that's
- 39:46something
- 39:46feasible often it's not done for
- 39:50for lightning studies because it's a lot
- 39:51of work but to be precise it's possible
- 39:53to do that
- 39:57for such arresters it's very important
- 39:59here to use a frequency dependent model
- 40:01of soldier resistor
- 40:02so there is a specific video on how to
- 40:05create those frequency dependent model i
- 40:07will come back to them
- 40:08quickly after but yeah keep that in mind
- 40:11and the lightning source also is a sig
- 40:14resource
- 40:15the lightning current source is a secret
- 40:16source
- 40:20okay so at the end of the day if you see
- 40:21a substation like that it will look like
- 40:23this where you have
- 40:25any time you have here a conductor you
- 40:27will model it with
- 40:28a cp line here even very short
- 40:31conductors were modeled with cp9 three
- 40:34meters it's okay
- 40:35it will force to use a very small time
- 40:37step
- 40:38to simulate that but it's extra
- 40:40precision
- 40:42you see that each equipment are modeled
- 40:44by a capacitance
- 40:46and you have surgery so that's
- 40:53okay so the lightning strike here you
- 40:55can find it
- 40:56if you go to um
- 41:00if you go to sources here you can grab
- 41:03what is called seed currency so this is
- 41:06our lightning strikes
- 41:08even better what i would recommend you
- 41:09to do is to use this example which is
- 41:12available on our exchange platform you
- 41:15can
- 41:15contact the technical support to get it
- 41:18and
- 41:19to use this model because in this model
- 41:20you only enter
- 41:22the uh the peak current of lightning
- 41:25strike for example here 10 000
- 41:28and automatically it will adjust all
- 41:31other parameters so the stiffness and
- 41:34the tail duration
- 41:36so it's it's pretty nice you don't need
- 41:37to
- 41:39you don't need to calculate or latch
- 41:40yourself
- 41:46okay so it's uh the current source looks
- 41:47like this so you have several parameters
- 41:50the peak current uh you have the
- 41:53time the tf here which is uh
- 41:56well you can see what it is in the in
- 41:58this figure
- 41:59uh you have uh the stiffness
- 42:02this is kind of important and a major
- 42:04difference compared if you do the
- 42:06lightning strike using this model
- 42:08compared to a double exponential model
- 42:10uh the stiffness will not be the same
- 42:12and as you know the stiffness of current
- 42:14has a huge impact on overvoltage so
- 42:17that's why
- 42:18it's recommended to use this model
- 42:23also typically in the lightning strike
- 42:25model we put a resistance in parallel
- 42:28and that's what we've done here in this
- 42:29little model you have
- 42:32the secretable with this in parallel
- 42:44okay so here you have some equations on
- 42:47how to calculate
- 42:49uh current stiffness and all the
- 42:51parameters
- 42:53um if you hear the actually that's the
- 42:56the summary of it so the current
- 42:58the stiffness that tells you the
- 43:00calibration and
- 43:01the time to get some t
- 43:05t30 i don't remember what it is
- 43:12it's a tf
- 43:15okay so you have everything you need
- 43:17here i'm not sure about td30 but
- 43:19what you need really is i sm th
- 43:22and i would have to double check if t30
- 43:27is
- 43:27tf not sure about that it's actually
- 43:30written in the
- 43:32in the script of this device here
- 43:35let's see if we can quickly find out
- 43:38find that out till team
- 43:58not sure if uh td30 is actually used in
- 44:01the model oh yeah it is td30
- 44:11no i don't think td sort is actually
- 44:13used in the model itself
- 44:15it's just another parameter
- 44:18apologize i don't remember what it is
- 44:20exactly
- 44:23all right so then um then you need to
- 44:26model the tower
- 44:28okay let me keep going on the tower so
- 44:30the tower you will approximate that it's
- 44:32a cylinder
- 44:33and then you will model you will
- 44:36calculate
- 44:37the surge impedance based on
- 44:41the parameter of this of this cylinder
- 44:44okay so the average radius uh the
- 44:46section
- 44:47here h1 h2 if the
- 44:50radius is if the radius is changing
- 44:59okay so then what the way you are going
- 45:01to model that is to use a cp line
- 45:04in the cp line you put the surge
- 45:06impedance the propagation speed of 80
- 45:1080 of speed of light and that's how you
- 45:12will model this tower
- 45:16let me show you how it is
- 45:21okay so you see here that's our tower um
- 45:25before actually showing you that let me
- 45:26show you a little example a drawing
- 45:28you see you have a tower here and so you
- 45:30have different
- 45:32sections for each sections here
- 45:36and the arms are also model however
- 45:38because the arm are very short
- 45:41we only use inductances for that it's up
- 45:44to you
- 45:44you may use cp line or inductances you
- 45:46may do the calculation the same
- 45:48calculation for the arms
- 45:49it's fine to use conductances else
- 45:52typically it's a one micro henry per
- 45:54meter
- 45:55for those sections okay so this
- 45:58is our transmission line here you have
- 46:00all the faces so
- 46:01phase a b and c for example and the top
- 46:04here is the tower top so the chilling
- 46:06wire
- 46:06that's where we'll apply the lightning
- 46:08strike so when we apply the lightning
- 46:10strike you see that it will travel
- 46:11through the line
- 46:13it may create an overvoltage between
- 46:14here the a phase and an overvoltage and
- 46:17this is the air gap model where
- 46:19you may have a flashover and here you
- 46:22have the
- 46:23grounding pin of the of the tower where
- 46:26we will
- 46:27model the grounding resistance
- 46:30okay so the grounding resistance is
- 46:32modeled as such
- 46:34when you have a lightning strike you
- 46:36have a lot of current going
- 46:37through the ground inside the ground and
- 46:39these create what is called ionization
- 46:42which will vary the resistance
- 46:45the grounding resistance and this is
- 46:48here the equation
- 46:49provided by a triple e for the grounding
- 46:51resistance
- 46:52so you have here it depends on the
- 46:55lightning density and
- 46:56ig and ig the parameter calculated which
- 46:59depends
- 47:00on the solar resistivity mostly and
- 47:05the footing resistance of at 60 hertz so
- 47:08this may be determined
- 47:10by measurements and the solution
- 47:13gradient so here we typically take this
- 47:15value 400.
- 47:17how do we model that now well we just
- 47:19create a small control circuit
- 47:21we use this controlled uh
- 47:24norton equivalent where we set i
- 47:28the current at zero the whole time so
- 47:30basically it's just a control resistance
- 47:33and you see we measure here the current
- 47:36then we have the equation i just show
- 47:39here
- 47:40you the input u2 which is the footing
- 47:43resistance multiplied by square root of
- 47:46two
- 47:47one plus the current u1 divided by
- 47:5118 500 so that's exactly
- 47:55this equation here
- 47:59okay and so this will control the
- 48:02resistance
- 48:03and here we have a small selector when
- 48:06the intensity
- 48:07is lower than 18 500
- 48:10then we consider instance is the
- 48:14footing resistance and when it's higher
- 48:16we
- 48:17use this uh this calculation
- 48:20okay so it's just a selector okay so
- 48:23that's how we model that
- 48:24again this tower model is available
- 48:27on demand so if you have a lightning
- 48:29study to do you simply use that and
- 48:31modify it
- 48:35this example is actually inside the mtp
- 48:37example
- 48:44right so now let's discuss how do we
- 48:47model those insulators
- 48:50like i said you have two possibilities
- 48:53which will mainly depend on the length
- 48:55of the
- 48:57insulator there is one the first method
- 49:00is
- 49:01when you have a voltage time curve which
- 49:03means that the insulator will be able to
- 49:05withstand a certain voltage for a
- 49:07certain time only and after this time
- 49:09you will have the backlash over
- 49:10so the breakdown you may have this curve
- 49:13here
- 49:14then one way you can do that is again
- 49:17the same way we've done for the
- 49:18resistance
- 49:19uh use a control um
- 49:23use a control circuit to determine that
- 49:26so you will enter those points
- 49:28in a table and measure the current
- 49:32create a timer and when you reach the
- 49:35curve
- 49:35basically close the gap it's possible to
- 49:38do that but it's
- 49:39not really what we recommend it's
- 49:41possible to do it but
- 49:43i will show you after other way to do it
- 49:45which are easier
- 49:47so the other model which is recommended
- 49:49actually
- 49:50is for gaps which are lower than
- 49:541 meters or 1.2 meters
- 49:58so here it uses an equation to determine
- 50:00if there is a flashover or not
- 50:02so it's used area criterion model so
- 50:05according to the length
- 50:07the the size of your gap okay you have
- 50:10those parameters and you can interpolate
- 50:12in between
- 50:14and then automatically the model can
- 50:16continuously integrate
- 50:18the difference between v-gap and v0 so
- 50:21the voltage
- 50:22in the in the gap in the at the
- 50:25insulator terminal
- 50:27versus v0 here and when these integral
- 50:31becomes larger than d
- 50:32it's have a closed ideal switch so the
- 50:36current will now go through the
- 50:38uh goes through this gap and the voltage
- 50:41on the phase
- 50:42and the neutral and the ground will be
- 50:44the same
- 50:46okay so this model is valid for um
- 50:49it's valid for a smaller gap and you can
- 50:52find it here in the library
- 50:55switches and it's called
- 50:58um air gap
- 51:02all right so that's the model we use
- 51:04here in the slime model
- 51:05it's right there
- 51:12okay the second model to use you can use
- 51:15it's for
- 51:16larger gaps more than one meters more
- 51:19than one meter
- 51:20so this one is uh now reproduce the
- 51:23leader propagation
- 51:24okay so it will actually take when there
- 51:27is a flashover it will take some time
- 51:29for the flashover to go from this point
- 51:30to here and
- 51:31there will be a resistance associated
- 51:35with that
- 51:36so here the equation is written there
- 51:39the only input for this model will be
- 51:41the lens and the mall is already built
- 51:44in emtp
- 51:45so you can simply grab it from the
- 51:47library
- 51:48you have here an example if you go to
- 51:51application
- 51:52air gap leader okay the model is there
- 51:56and you can select here the lens
- 52:02okay so again this one is recommended to
- 52:03be used when you have a lens high
- 52:05higher than one meter
- 52:09okay so then you have the software store
- 52:11model
- 52:12here again we did a i repeat we did a
- 52:14complete video
- 52:16on how to model such arresters for
- 52:19lightning
- 52:20it's important to use the frequency
- 52:22dependence of resistor
- 52:24so the frequency dependence of the
- 52:25restore is model like this as a
- 52:27combination of
- 52:28rlc component and
- 52:32two nonlinear resistance which have an
- 52:34exponential
- 52:35fitting there is a procedure in order to
- 52:39build that
- 52:40we actually have a device which does it
- 52:42automatically for you
- 52:44so the only things you will enter are
- 52:46the uh
- 52:47the impulse test
- 52:51results so you have what is called v10
- 52:54which is the voltage for a lightning
- 52:57serve of 10 kilo amps
- 52:59the lightning surge takes eight
- 53:01microseconds to go to the peak
- 53:03and 20 microseconds to go to the top so
- 53:06it's a
- 53:07820 so you need this value
- 53:11and you need also a switching search so
- 53:13a switching surge which
- 53:15has you know for example a 30 60 so
- 53:18third takes 30 seconds to go from zero
- 53:21to the peak
- 53:22and then 60 microseconds sorry
- 53:24microseconds for the tail
- 53:26so you need those two uh informations to
- 53:29build this model
- 53:30it's basically some fitting so we'll
- 53:32adjust those characteristics to match
- 53:35the switching uh pulse and then we'll
- 53:38adjust l1 here
- 53:39to match the lightning test and so then
- 53:42this
- 53:43surge arrester is valid for switching
- 53:44and lightning so that's the one
- 53:46recommended
- 53:47i really invite you to take a look at
- 53:48the video that we've done on server
- 53:50store modeling to do that
- 53:52and download in our exchange platform
- 53:54the add-on which does
- 53:56all that automatically yeah so this um
- 54:00this model you enter basically all the
- 54:02information you need
- 54:04actually for that you also need to know
- 54:05the number of columns in parallel and
- 54:08the length of the surge arrester okay so
- 54:11you enter all that in here
- 54:13and it will automatically create this
- 54:14model for you so
- 54:16fairly easy at the end of the day
- 54:23okay so here you have the way it's it's
- 54:25built if you want to do it yourself
- 54:29okay so this we discussed already the
- 54:30voltage source where you put a long
- 54:32transmission line to avoid reflection
- 54:40okay so let's sum up one more time uh
- 54:43what you have to do
- 54:44so the first thing will be to uplink the
- 54:46like apply lighting strike at default
- 54:48points to determine the critical
- 54:50current at um at each step
- 54:54when you try to find a critical current
- 54:57you compare the maximum voltage
- 54:59with the bil of each equipment
- 55:02but actually remember that we have to
- 55:04consider the bil with
- 55:06some safety coefficient safety factor
- 55:08amplitude
- 55:10correction factor and all that so what
- 55:12you're going to do is
- 55:14when you monitor the overvoltage instead
- 55:17of comparing with the bil you will
- 55:18compare to the bill divided by
- 55:20all these coefficients so safety
- 55:24coefficient
- 55:24safety factor atmospheric correction
- 55:27factor and altitude factor the
- 55:29atmospheric correction factor depends on
- 55:31the pollution mostly
- 55:33right so all that take a look at the
- 55:37you know for the ieee or iec standard to
- 55:40see what the value of those coefficients
- 55:41how to find them
- 55:42we had a lot of references in the origin
- 55:45and
- 55:46classification of all hbo
- 55:49and so then when you have this um
- 55:52when you have the critical card at each
- 55:54tower
- 55:56then you can determine the mean time
- 55:58between failure
- 56:01if you've watched the switching
- 56:03insulation combination video
- 56:05you've seen that we have two methods
- 56:07deterministic and statistical for
- 56:09non-self restoring insulation and
- 56:12self-resting insulation
- 56:14but like i said at the beginning of this
- 56:16one here there is no need
- 56:17um for this for lightning you can
- 56:21you can use the deterministic method for
- 56:23all type of insulator
- 56:25because of the low dispersion of
- 56:28the insulation correct the the waste and
- 56:32probably the western voltage probability
- 56:34okay so once
- 56:36you have uh your critical current
- 56:40you use here and a standard
- 56:43probability function to determine the
- 56:46probability to have
- 56:48such an intensity such a
- 56:52current constituent like me for example
- 56:55you remember i did here my simulation
- 56:58for the first hour and i found 75
- 57:02kilohertz for the critical current
- 57:06then i use this equation here
- 57:11it will tell me the probability to have
- 57:13such a lightning
- 57:14and i will assume it's the same
- 57:16probability
- 57:18for the entire distance covered by this
- 57:20tower so basically for half of
- 57:22from half of this line to half of this
- 57:24line i will assume this critical
- 57:26current just so i don't do so many
- 57:28simulations you have to simplify the
- 57:29problem
- 57:30and then you have this probability for
- 57:33all this section of line
- 57:35then you will do the same thing here and
- 57:36you will have the same probability there
- 57:43okay so once you have the probability
- 57:46like that for each section
- 57:48you can calculate the annual number of
- 57:52straw of
- 57:53strokes okay so for that
- 57:56the way you will calculate that is the
- 57:58ground density
- 57:59multiplied by multiplied by twice
- 58:03r a or a i will
- 58:06go back here to show you what it is
- 58:17go back where i was
- 58:22and b is the distance between each
- 58:24conductor
- 58:30okay so when you have so you have the
- 58:32annual number of strokes
- 58:34you multiply that by the probability you
- 58:37get
- 58:38for each section of line and
- 58:42k t it's an extra coefficient to add
- 58:46in the insulation coordination procedure
- 58:49which depends on the tower resistance
- 58:54okay so you will adjust this t 60 or 100
- 58:57percent for if it's a high resistance
- 58:58tower you use 100
- 59:00else to 60 of chance and so that's how
- 59:03you calculate now
- 59:04the number of backlash over for each
- 59:07section of line
- 59:08and you do that for expand
- 59:11until the critical distance and you can
- 59:14add up
- 59:14all these numbers to finally get
- 59:18uh the number of um the
- 59:22the annual number of backslash over
- 59:26okay so it's um it seems like uh it's
- 59:28difficult but it's actually not so
- 59:30difficult
- 59:32okay so if you need more readings
- 59:36you have here some references i
- 59:38recommend you to take a look at
About this transcript
This page contains the full transcript of Insulation coordination – Lightning transient overvoltages by EMTP, generated from the public captions YouTube serves with the video. The transcript has 8,518 words across 1,525 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, caption language selection, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.