How To Bid Commercial Construction Jobs — Transcript
Full transcript
- 0:00How to bid commercial construction jobs. In this video, I'm going to talk to you
- 0:05about the process for the general contractor to bid for the project,
- 0:09and it will also apply to subcontractors bidding to be awarded the actual trade specific scope
- 0:15for the general contractor. So when we look at commercial construction projects,
- 0:20we're fascinated by the bridges, the laboratories, the hospitals, but what goes behind goes on
- 0:25behind the scenes in the bidding process. We're going to talk about that right now.
- 0:36Okay, so when we talk about bidding a commercial construction project, there's two general ways
- 0:42to go about this. First of all, it's the general contractor bidding to be awarded the project from
- 0:47the building owner, and then the subcontractor to the general contractor. Let me give you a
- 0:52high level overview of both. First of all, if you are bidding a commercial construction project and
- 0:58you are doing it with your team, you are going to learn all about it, because it is an intense
- 1:03process. First of all, you'll have your RFP or RFQ. It's the request for proposal or request
- 1:11for qualifications, right? It may be heavier on the price side or the qualification side. There's
- 1:16lots of different formats, but typically it's broken down into the written proposal and the
- 1:22actual interview. I love both. Written proposal process, you're going to gather with the team,
- 1:28have a team lead, really shape a single message, and then delegate to the other
- 1:33proposal participants. I'll call them before we get to the interview team, and they are going to
- 1:39help put together a written proposal as subject matter experts that really answer the questions
- 1:45and make sure that you are communicating the aspects of price and qualifications and
- 1:52approach to the building owner so that you can be selected, and then go on to the interview. It's an
- 1:57absolutely amazing process. And what I would say is you have to shape a compelling message. You
- 2:03have to follow the hero's journey. There's lots of really good books about that. You have to be very,
- 2:08very clear and interesting to keep their interest throughout reading the proposal. And you have to
- 2:15start planning and solving problems for their project. Now let's go into the interview. This
- 2:20is crazy cool. Everything you say needs to be turned into sound bites. You need to have amazing
- 2:26visuals, and you need to know what you're talking about and talk to their needs. So you will go
- 2:33through an interview preparation process and then get into the interview and again, start showing
- 2:38them how you're going to solve their problems and take care of their needs, but you're going to do
- 2:43it with love for the selection committee, with high energy, hopefully at the right time of day,
- 2:49and you're going to do it without the fear and without the nervousness and really go in there
- 2:53and win that interview. Now, when we're pricing this, I'm going to go through the exact steps
- 2:58there, but it's basically the same when you're a subcontractor or when you're a general contractor,
- 3:04the steps that you will follow for pricing. But let me talk real quick about subcontractors. You
- 3:09are either going to be bidding the project based on an instruction to bidders and a bid package,
- 3:15or you might have to interview as well. The key thing the general contractor is looking for in
- 3:21this interview is to make sure that you have the right team, the right approach, the right price,
- 3:25the right schedule. And the biggest thing that we worry about with trade partners is that you
- 3:30actually can deliver on your promises. And we want to really make sure that you are the right
- 3:36fit for this process, so whether you're a GC or a subcontractor. Now let me go through the specific
- 3:42steps you'll follow when you're bidding at either level. So number one, understand the project
- 3:48requirements. What is it that you're building? This is not just crack open the plans or know what
- 3:53type of building it is. We at Elevate and lean tax and lean bill. We really go on a deep dive on
- 3:59this. We attempt to understand the building, all of the numbers that quantify what goes into that
- 4:04building, we will do a page flip look at different one off areas. Are there any overhangs? Are there
- 4:10any high bay ceilings? Are there any special types of form work? Is this a postage stamp site like
- 4:15we're going to get a really good feel for what this building actually is before we go into the
- 4:20bidding process. Number two, and I love this, go do a site visit and assess what's going on
- 4:27on the actual project site. And you know what's even cool, actually, let me say this the right
- 4:31way. Even cooler than just going to the site is going out there and calling in a blue stake ahead
- 4:37of time. And then this sounds silly. You'll at least want to do this once you've won the job,
- 4:42but one of the cool things that you can do is do some preliminary layout and find out
- 4:46how that building is going to sit on the actual lot. You definitely have to do that once you've
- 4:51been awarded the project. I would actually lay out the entire structure and see how it overlays
- 4:55with the utilities, but you definitely want to at least get a feel for the site. And here's. I want
- 5:00you to look for look at soils, conditions, neighbors, access, and I want you to see if
- 5:05any utilities need to be relocated. Do you need shoring these are all things that you can loop
- 5:10into your written proposal and your interview to start solving problems right away. Number three,
- 5:16you're going to want to start estimating costs. Obviously you're going to want material costs,
- 5:20labor costs, equipment costs. You'll break it out as your general conditions, which is
- 5:24basically your insurance, bonds and your staff, your general requirements, which is anything
- 5:29that you have to use to build the project from a general requirement standpoint, anything that is
- 5:35needed for logistical support. Then you'll have your subcontracts, your contingency and your fee.
- 5:41And you know, there's other categories in that budget, but you're going to start estimating
- 5:45those and make sure that you have accurate quantities, that you're getting trade numbers,
- 5:49or if you are the trade that you're providing your own number, and if you're the GC, that
- 5:53you're doing your internal control estimates, and that you're comparing those to make sure that you
- 5:59have multiple sets of eyes on these numbers and that you have accurate bid numbers. Number four,
- 6:03you're going to propose on a timeline, obviously, when it comes to a cost and schedule standpoint,
- 6:08that's whether you're the GC or you're the trade partner. And you will definitely want to break out
- 6:13your estimate into different categories so you can see the clear picture of what you're proposing.
- 6:18And you want to create a timeline, and in my case, an overall macro level tax plan to show
- 6:24the schedule portion of this project. And I would also include your zone maps, your logistics plans,
- 6:29so that you know what has fed into your general requirements inside your budget number five,
- 6:35submit your bid. Now, I do want you to know that there isn't just a one size fits all with this as
- 6:40a GC, you're either going to submit your initial proposal from a cost standpoint, in the written
- 6:47proposal and in your interview, or you're going to be selected on qualifications, and then you're
- 6:52going to enter into a CM at risk type environment where you're going to reach A guaranteed maximum
- 7:00price, where you eventually submit your GMP, and that total price, right? That aggregates the
- 7:07overall budget, and that is what you are at risk for to build the project, is the GC once you are
- 7:13selected. Now, if you're the trade partner, people do this differently. By the way, you can reach a
- 7:18GMP early or late in the design process, same with a trade partner. You might be bidding the
- 7:24design development documents 50% CDs or 100% CDs, and you might literally only give plug numbers or
- 7:32square foot pricing, or unit pricing up into the 100% CDs, or whenever the GC is going to bid it
- 7:38out and then fully bid it. Or you might have to do a more intense process throughout but either way,
- 7:44strategize. The key to this is literally just sketching this out on paper as the GC or the trade
- 7:50partner, and know the strategy for how you're going to bid out, know the strategy for how
- 7:54you're going to bid it out in a way that gets you the best number, that allows you to release work
- 7:59early enough, but doesn't waste the time of the trade partners. And then obviously you have six
- 8:04your post bid follow up, where you find out if you won the project as the GC, or you won the project
- 8:10as the trade partner, as the subcontractor. And then you know, if you didn't, obviously get your
- 8:14lessons learned and approved from there. But if you did, obviously it, we are off to the
- 8:19races. Get the feedback, but start immediately to prepare anything that deals with your scope, your
- 8:25contract, long lead procurement, and preparing to start strong on that project site. And remember,
- 8:31it's all about scope. Scope, scope. We do not want scope gaps in any of these processes. And so I'd
- 8:37like to close up, by the way, if you've liked this video, please like and subscribe. Let me give you
- 8:41some tips along the way. Number one, get accurate subcontractor scopes and do control estimates
- 8:48with quantities that will allow you to compare the pricing and make sure that it is accurate. Number
- 8:55two, be realistic with time frames. It takes some time to put these bid packages together. It takes
- 9:00time when you're bidding out trades. It takes time for them to send you their number in response. It
- 9:05takes time to create the written proposal and do the interview. This takes time, so make sure
- 9:10you're being realistic with it throughout number three, always make sure you have buffers. You
- 9:15have contingencies built in. You'll need buyout contingency, you'll need contractor contingency,
- 9:20you'll need owner contingency make sure you have enough buffers to where you don't get yourself in
- 9:25trouble. And really you're going to want to stand out if you're going to want to win this, either as
- 9:29the GC to the owner or as the trade to the general contractor, you must stand out by adding value,
- 9:35by making sure that you're preventing anything that would keep the selection kit committee up
- 9:40at night and start planning their project from day one, and just remember, this can be an excellent,
- 9:46precise and fun process if you know the strategy and you're working as a team and you know your
- 9:52numbers. And so here's what I'm going to do. I'm going to put in the description below. This is a
- 9:57blog post, but also offer that if you ever want. Any help, reach out to us. We have templates.
- 10:02We do this all the time, and remember, we're wanting to find the best value, not the lowest
- 10:09bid. Lowest bid is never lowest overall total cost. Make sure we're doing this with high levels
- 10:15of communication, with high levels of double checks, with accurate numbers and with buffers,
- 10:20and this should be an amazing process for you. I hope you've enjoyed this video. On we go.
About this transcript
This page contains the full transcript of How To Bid Commercial Construction Jobs by Jason Schroeder, generated from the public captions YouTube serves with the video. The transcript has 1,962 words across 114 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, caption language selection, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.