  2. 0:03steel dynamics is a leader in the mini
  3. 0:06mill steelmaking industry with a focus
  4. 0:09on value-added products with demanding
  5. 0:11quality requirements and at the heart of
  6. 0:14the mini mill process a more
  7. 0:16environmentally friendly way of making
  8. 0:18steel his scrap steel lots and lots of
  9. 0:22scrap steel in fact about 75% of the
  10. 0:25material SDI uses to make new prime
  11. 0:28steel consists of scrap steel that is
  12. 0:31often left to rust in junkyards or
  13. 0:33litter the countryside SDI also owns
  14. 0:37omni source a second largest scrap
  15. 0:40recycling company in north america and
  16. 0:42that's where our story begins at an omni
  17. 0:45source facility in indianapolis omni
  18. 0:50source collects and processes ferrous
  19. 0:52scrap and non ferrous grout at more than
  20. 0:5570 facilities around the country here at
  21. 0:59one of omni sources five facilities in
  22. 1:01indianapolis a gigantic shredder reduces
  23. 1:04entire automobiles and other large
  24. 1:06pieces of scrap into smaller sections
  25. 1:08that will fit into the flat role
  26. 1:11divisions electric arc furnaces after
  27. 1:14the scrap is shredded giant magnets
  28. 1:16separate the ferrous materials from the
  29. 1:18non ferrous non ferrous scrap is
  30. 1:22conveyed away for further sorting just
  31. 1:25as in the mini mill steelmaking process
  32. 1:27nothing goes to waste at a visual
  33. 1:30inspection checkpoint employees remove
  34. 1:33any non ferrous crap that's hung up with
  35. 1:35the ferrous material
  36. 1:40next the scrap is shipped to the flat
  37. 1:43Lowell divisions mill at Butler in
  38. 1:45northeast Indiana the mill campus
  39. 1:49includes 15 miles of railroad track
  40. 1:52capable of handling 700 rail cars at one
  41. 1:55time for incoming scrap and outgoing
  42. 1:58steel shipments the mill also receives
  43. 2:01200 to 300 truckloads of scrap and other
  44. 2:04raw materials every day it's a 24/7
  45. 2:07operation that runs 365 days a year
  46. 2:11330 tonnes scrap cranes and large front
  47. 2:14loaders facilitate moving the scrap
  48. 2:16around in and out of rail cars and
  49. 2:18trucks and to the scrap Bay at the edge
  50. 2:21of the milk shop where large magnets
  51. 2:23lift up the scrap and place it into a
  52. 2:25charging bucket scrap is loaded into the
  53. 2:29charging bucket according to grade to
  54. 2:31achieve the exact chemistry necessary
  55. 2:33for our steel products each furnace heat
  56. 2:38consists of 175 tons with at least 75%
  57. 2:43of its ground and about 10 percent
  58. 2:46liquid pig iron from iron dynamics a
  59. 2:48division of SDI on the flat roll mill
  60. 2:51campus SDI is also making iron rich
  61. 2:55units with a pioneering process at
  62. 2:57Mesabi nugget in Minnesota
  63. 2:59both IDI and Mesabi use iron making
  64. 3:02methods that are far more eco-friendly
  65. 3:04than
  66. 3:05additional blast furnaces mini males use
  67. 3:08electric arc furnaces or IAF's which
  68. 3:12required much less in the way of Natural
  69. 3:14Resources versus traditional blast
  70. 3:16furnaces for every tonne of Steel
  71. 3:18produced by SDI we eliminate the need
  72. 3:22for 2,500 pounds of iron or 1400 pounds
  73. 3:26of coal and a hundred and twenty pounds
  74. 3:29of limestone and we use significantly
  75. 3:32less energy in the process the eaf
  76. 3:35process also produces 67% less carbon
  77. 3:39equivalent emissions in addition 95% of
  78. 3:42our scrap comes from within 250 miles of
  79. 3:46our plants the charging bucket is moved
  80. 3:50to a position directly above one of the
  81. 3:53mills to twin shale IAF's
  82. 3:55the scrap is then released into the
  83. 3:57furnace creating some real fireworks the
  84. 4:01reason for the explosion is that a
  85. 4:03portion about 40 tons of each heat of
  86. 4:06molten steel is left in the furnace to
  87. 4:08keep it hot for the next heat saving
  88. 4:11time and money
  89. 4:12once the scrap and pig-iron are loaded
  90. 4:15the loof of the furnace is closed and
  91. 4:17three large carbon electrodes are
  92. 4:20lowered through an opening in the roof
  93. 4:21then it's Showtime
  94. 4:27and it's loud very very loud the rods
  95. 4:31circulate our arc up to a hundred and
  96. 4:34fifteen million watts of electricity to
  97. 4:36melt the scrap at a temperature reaching
  98. 4:39three thousand degrees Fahrenheit the
  99. 4:41power is on for about 35 minutes to
  100. 4:44complete the melting of each heat which
  101. 4:46is a good reason why our monthly
  102. 4:47electric bill is about seven to eight
  103. 4:50million dollars once a heat is
  104. 4:53completely melted the furnace is tipped
  105. 4:55to pour off the slag a collection of
  106. 4:58impurities that rises to the top of the
  107. 5:00heat the molten steel is then tapped
  108. 5:03through the bottom of the furnace and
  109. 5:04into a ladle the steel then goes to the
  110. 5:08ladle metallurgy furnace or lmf where a
  111. 5:11variety of processes can be accomplished
  112. 5:14including desulphurization and
  113. 5:16deoxidation the temperature of the steel
  114. 5:19can be adjusted with carbon electrodes
  115. 5:21and the chemistry of the steel can be
  116. 5:23changed by reducing some alloy elements
  117. 5:26and the introduction of others from the
  118. 5:29ladle metallurgy furnace the steel goes
  119. 5:31to the thin slab caster x' on the caster
  120. 5:35deck the turret rotates to exchange an
  121. 5:38empty ladle with another ladle filled
  122. 5:40with molten metal as it goes through the
  123. 5:43casters the molten steel now about 2,800
  124. 5:47degrees Fahrenheit is converted into a
  125. 5:50continuous ribbon of steel approximately
  126. 5:5260 millimeters thick and up to a hundred
  127. 5:55and eighty feet
  128. 5:56on these thin slabs can be rolled into
  129. 5:59steel sheet much more quickly
  130. 6:00efficiently and cost effectively than
  131. 6:03the much thicker slabs produced a
  132. 6:05traditional integrated steel mills
  133. 6:08producing slabs up to 64 inches thick
  134. 6:11the casters operate at maximum speed of
  135. 6:14230 inches per minute and process 9,000
  136. 6:18tons of steel in a 24 hour period going
  137. 6:22through a 2,400 gallons per minute spray
  138. 6:25of cooling water the slab is completely
  139. 6:28solid in 24 seconds it has an exit
  140. 6:31temperature of 2,100 degrees after being
  141. 6:35sheared to length the slab goes through
  142. 6:37one of two tunnel furnaces where the
  143. 6:40steel is reheated to 2150 degrees before
  144. 6:44going to the hot strip mill scale is
  145. 6:48removed from the slab before it's rolled
  146. 6:49with water jet spraying 4000 gallons per
  147. 6:52minute at 3,500 pounds per square inch
  148. 6:56slabs are reduced to meet customers
  149. 6:59requirements on our seven stand hot
  150. 7:01rolling mill seven 10,000 horsepower
  151. 7:03motors drive the work rolls in the mill
  152. 7:06stands and 4,000 tons of rolling force
  153. 7:09per mill stand reduces the thickness of
  154. 7:12the material to as little as one
  155. 7:15or point zero for zero inches a new hot
  156. 7:19band of Steel is automatically coiled on
  157. 7:21average each coil weighs about 22 tons
  158. 7:25or as much as 10 cars in the cold milk
  159. 7:29complex coils are chemically cleaned
  160. 7:32through the continuous pickle line
  161. 7:34operating at 700 feet per minute the
  162. 7:37pickle line has the capacity to process
  163. 7:391.6 million tons of steel annually
  164. 7:43pickled and oiled coils can be sold as
  165. 7:46finished products galvanized on the hot
  166. 7:49rolled galvanizing line and sold his
  167. 7:51finished products or further processed
  168. 7:53through the cold reversing mill hot band
  169. 7:56is uncoiled on the reversing cold mill
  170. 7:58where the gauge will be further reduced
  171. 8:00to his light as eleven thousand seven
  172. 8:03inch coils that have gone through the
  173. 8:07reversing mill are usually galvanized or
  174. 8:10annealed on one of our two galvanizing
  175. 8:14lines at Butler an employee removes the
  176. 8:16dross or impurities from the surface of
  177. 8:19a zinc pot holding as much as 180 tons
  178. 8:22of molten metal SDI's galvanizing lines
  179. 8:26offer a variety of value-added services
  180. 8:29such as inline temper passing tension
  181. 8:32leveling chemical treatment acrylic
  182. 8:35coating and oiling anneal coils go
  183. 8:38through the temper mill and are sold or
  184. 8:40painted on our coil coating lines here
  185. 8:45we are on the banks of the Ohio River in
  186. 8:47southern Indiana
  187. 8:49Jeffersonville produces hot dipped
  188. 8:51galvanized galvalume acrylic coated
  189. 8:54galvan
  190. 8:55and acrylic coated galvanized steel as
  191. 8:58wide as 61 inches in fact SDI is the
  192. 9:02only company in North America to make
  193. 9:04galvalume and widths wider than 50
  194. 9:06inches before being introduced into the
  195. 9:09main pot containing galvalume coating an
  196. 9:12aluminum zinc ingot is
  197. 9:14melted in a pre melt pot that flows into
  198. 9:16the main pond to maintain a more
  199. 9:18consistent temperature here a coil of
  200. 9:21galvalume is checked for surface defects
  201. 9:26Jeffersonville is also home to one of
  202. 9:28our two state-of-the-art coil coating
  203. 9:31lines operated by the flat low division
  204. 9:33the coil coating lines at Jeffersonville
  205. 9:36and at Butler give the division a
  206. 9:38capacity to paint approximately 500,000
  207. 9:41tons of steel each year SDI's flat row
  208. 9:45division is the only steel mill
  209. 9:47operation in the United States that
  210. 9:49paints its own steel the eight story
  211. 9:53accumulator unwinds the coil allowing
  212. 9:56faster continuous coating some coils of
  213. 9:59thinner gauge steel would measure as
  214. 10:01long as five miles have completely
  215. 10:03unwound the coil coating line has three
  216. 10:07coders one for primer and two for the
  217. 10:10top and bottom finish coating making
  218. 10:12quick color changes possible these lines
  219. 10:14have the most state of the art equipment
  220. 10:16in the industry including vision
  221. 10:18technology producing the highest quality
  222. 10:21pre painted coils available in the world
  223. 10:24weather coils are coated at butler or at
  224. 10:27Jeffersonville the highest standards of
  225. 10:29quality are maintained through
  226. 10:31continuous monitoring with leading edge
  227. 10:33technology and equipment and
  228. 10:35well-trained eyes we recently installed
  229. 10:39equipment that allows coils to be placed
  230. 10:41on pallets coils placed on pallets are
  231. 10:44easier to handle for our customers who
  232. 10:46depend on forklifts to move materials in
  233. 10:49their facilities coated coils are staged
  234. 10:52for shipment to our customers in a broad
  235. 10:54range of industries who use our steel in
  236. 10:57a wide variety of applications scrap
  237. 11:00produced during processing at
  238. 11:02Jeffersonville is loaded for shipment
  239. 11:04back to the butler milk
  240. 11:06you guessed it the scrap will be melted
  241. 11:08and used begin to make new steel it's a
  242. 11:11full circle

About this transcript

This page contains the full transcript of How It Works - Steel Production by Extreme World, generated from the public captions YouTube serves with the video. The transcript has 1,559 words across 242 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, caption language selection, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.