Как строители хоронят ваши миллионы: скрытые работы и схемы — Transcript
Full transcript
- 0:00Hello, my dear friend. Today, you and I
- 0:02are going to talk about a very
- 0:04fascinating topic: construction control
- 0:06.
- 0:06>> As-built documentation.
- 0:08>> What kind of beast is that? Yes, exactly
- 0:10. People have a common problem. When
- 0:12they start maintaining a newly built, or
- 0:15even not-so-newly built house, they find
- 0:18that contractors come in, start drilling
- 0:21or sawing into a wall, and then
- 0:23utilities get damaged. They might
- 0:25puncture radiant floor heating or damage
- 0:27the electrical wiring.
- 0:28I’m not even mentioning cutting
- 0:30low-voltage lines and all those other
- 0:32issues, right up to the destruction of
- 0:34load-bearing structures.
- 0:36Like those stories where a partition
- 0:37wall was torn down in a building, and
- 0:39then the apartment block tilted a little
- 0:41. Part of this is due to the fact that
- 0:44people simply don't have the as-built
- 0:46documentation on hand.
- 0:48So, today we will figure out what
- 0:50as-built documentation is, what problems
- 0:53arise for people later on from its
- 0:55absence, how to handle this issue so
- 0:58that you do have this documentation, and
- 1:01most importantly, how it affects the
- 1:03lifespan of your future or current home
- 1:06.
- 1:07My name is Mikhail Kirchenko. I have
- 1:09been working in architectural and
- 1:11interior design for over 20 years at my
- 1:13studio.
- 1:15And our dear lead engineer, Konstantin,
- 1:17who has been doing construction
- 1:19engineering and site supervision for
- 1:21those same damn many years. Let’s dive
- 1:24in. I’ll make a quick remark.
- 1:27This was an unplanned episode.
- 1:30Kostya and I were rewriting the third
- 1:32block of construction control, called "
- 1:34Erecting the Shell," and we were
- 1:35planning to discuss lintels. But Kostya
- 1:37, as always, ran in with a fresh story,
- 1:40so we had to create something useful for
- 1:42YouTube.
- 1:44If you are interested in learning how to
- 1:46independently control construction and
- 1:48supervise a building site, please check
- 1:50the link to Boosty in the description.
- 1:53Go in and start learning.
- 1:55But today, Kostya, we are still going to
- 1:56address the question.
- 1:58Let’s figure out: what is as-built
- 2:02documentation?
- 2:04The definition.
- 2:09I see. We are now going to sort out the
- 2:11definition of what as-built
- 2:12documentation is.
- 2:14And what its absence leads to. Let’s go
- 2:17.
- 2:18>> As-built documentation is a set of
- 2:20documents with which the contractor who
- 2:22performed the work confirms that the
- 2:24work was carried out in accordance with
- 2:26the project.
- 2:28Or, if there were any deviations from
- 2:29the project, they are noted there just
- 2:31the same.
- 2:32And it shows how the construction
- 2:34structures, utility networks, building
- 2:36envelope, and roofing were actually
- 2:38executed.
- 2:39>> And now, a question. But he was building
- 2:41according to the blueprints, so there
- 2:43wouldn't be any "mess-ups." Build
- 2:44according to the drawing. Why isn't the
- 2:45project itself the as-built
- 2:47documentation?
- 2:48>> Because the project is how we see it in
- 2:50an ideal world. That is, it’s our ideal
- 2:52picture, our vision.
- 2:54But it never happens that in any kind of
- 2:57construction—whether it's a high-rise, a
- 2:59low-rise, or linear infrastructure, it
- 3:02doesn't matter—it never happens that all
- 3:04architectural and engineering solutions
- 3:07are executed exactly as planned.
- 3:09Right.
- 3:11Exactly as in the design, because
- 3:13sometimes, while work is being done, a
- 3:15thought comes a little later: "Why am I
- 3:17doing this here?"
- 3:19I mean, it all seems logical on paper,
- 3:21but when you see, for example, the
- 3:23utility line installed there, you think
- 3:25: "Wait, I wanted to put something here
- 3:27, like a flower vase, or maybe add an
- 3:29extra toilet later."
- 3:31And as a rule, certain additions arise.
- 3:33Or a person might say: "I want another
- 3:35partition here, or to shift this one, or
- 3:37could I have an opening made in this
- 3:38wall?" Accordingly, there are always
- 3:40some nuances that emerge during the
- 3:42course of construction and installation
- 3:44work.
- 3:45>> In other words, while building, some
- 3:47nuances may arise.
- 3:49Take the example of building a house,
- 3:51say, using monolithic technology. There
- 3:54is a monolithic pillar, right.
- 3:56There is specific formwork for it,
- 3:58calculated in the project, but the
- 4:00contractor brings different formwork and
- 4:03says: "Dude, I can't make this pillar
- 4:05exactly to the dimensions, I'll make it
- 4:08a bit larger, or for instance, I'll use
- 4:10more rebar while keeping the
- 4:12cross-section, because we can't maintain
- 4:14a 180mm wall, so we'll make it 220mm."
- 4:18This is exactly the case when, during
- 4:21construction, based on
- 4:23>> actual technical capabilities, the
- 4:25project is realized. This is where
- 4:27things can change, quite literally,
- 4:28during the construction of your home.
- 4:31The contractor simply, well, not exactly
- 4:33as drawn in the project—because a
- 4:34project is an idealized solution after
- 4:36all—
- 4:38>> introduces
- 4:39>> changes to the project, essentially,
- 4:41>> and builds with deviations from that
- 4:43project. Whether this is critical or not
- 4:46varies from case to case. Okay, sorry
- 4:48for interrupting, but you really need to
- 4:51understand these specific nuances.
- 4:54And most often, as I understand it, most
- 4:56of the as-built documentation and
- 4:58corrections occur during the
- 4:59installation of utility networks.
- 5:02>> Yes, not just those, actually, but even
- 5:04the load-bearing structures as well.
- 5:06There are situations where, again, with
- 5:09the layout of partitions, when a person
- 5:11sees one picture on paper—it's like when
- 5:13you go to a store, or rather open some
- 5:16marketplace, and you see a nice coat or
- 5:18a beautiful scarf.
- 5:20So, uh, you order it, you come in, you
- 5:22try it on, but it's different—the way it
- 5:24feels, the way it looks—and you’ve
- 5:26already built it up in your head, and
- 5:28well, you just don't like it. You're not
- 5:30going to take it, right? It’s the exact
- 5:31same thing with a house; you’re building
- 5:32it for yourself. You put up some
- 5:34partitions, made a room, and the
- 5:35dimensions seem fine, but when you step
- 5:37into the space, you realize, oh,
- 5:39something’s not quite right. "Can we
- 5:41just shift this partition over here by
- 5:43half a meter?""I found this great wall
- 5:45unit, a perfect kids 'wall unit.""It
- 5:47would fit right here.""But I'm 5
- 5:49centimeters short, move the partition."
- 5:51>> Kostya, to avoid that, you have to do
- 5:52the damn design first.
- 5:53>> You have to. Well, we're just looking at
- 5:55all sorts of different options right now
- 5:57. Uh, let me be clear, I don't like
- 5:59people who start moving walls around
- 6:02on-site in reality. You can't do that,
- 6:04guys. There should be specialized people
- 6:07for that. There are designers—we are an
- 6:09architectural and design studio, after
- 6:10all—who will draw up a plan and explain
- 6:12to you exactly where everything will go
- 6:14. And then, with their help, you give
- 6:16instructions to the planners and
- 6:18builders about moving walls.
- 6:20You shouldn't just move walls by eye.
- 6:22By the way, if you need professional
- 6:24designers, there will be a link in the
- 6:25description.
- 6:26And, accordingly, when something gets
- 6:28out of control—out of the project's
- 6:30control, that is—that’s what as-built
- 6:32documentation is for. It is intended for
- 6:34those who performed the construction and
- 6:37installation work or the layout of the
- 6:39utility networks. Very often, our
- 6:41projects are carried out without utility
- 6:43network designs, without any engineering
- 6:45plans.
- 6:47A crew comes in, lays everything out,
- 6:49then the screed guys come, cover it all
- 6:51up, and everyone leaves happily.
- 6:53Yeah. And then, what are you supposed to
- 6:56do with that? Where is my pipe here? And
- 6:59where is the electricity for my outlet?
- 7:02>> Actually, we’ve arrived at the issue
- 7:05that a lack of accurate representation
- 7:08makes it hard to work with that reality
- 7:11later on. What are the most amusing
- 7:12negative consequences you’ve encountered
- 7:14? I have a couple of stories myself.
- 7:16>> Yeah.
- 7:17Yes, I’d also like to conclude with the
- 7:19simplest way to put it.
- 7:22As-built documentation is the completed
- 7:24construction and engineering solutions
- 7:26transferred onto paper.
- 7:28The final result. It’s essentially a
- 7:29second project.
- 7:30>> Uh-huh. I can just imagine a crew from,
- 7:33say, Shmovit coming in to do your wiring
- 7:35, and you ask them for as-built
- 7:37documentation.
- 7:38And they’re like:
- 7:41"
- 7:41>> No, well, again, you could just as
- 7:42easily say:' Oh, dear crew, I'll draw it
- 7:44up myself. '" If you look at it, the
- 7:46services of a site engineer or a
- 7:47surveyor don't cost that much on the
- 7:48scale of the entire construction project
- 7:50.
- 7:51A person simply comes, takes all the
- 7:52measurements, checks everything, and
- 7:53writes it all down clearly and precisely
- 7:55. The developer or the client themselves
- 7:56can do this for their own peace of mind
- 7:57, just to have everything on record.
- 7:59Accordingly, there is nothing left for
- 8:01them to do but to sign and confirm. If,
- 8:04again, we are doing everything with an
- 8:06eye on the budget,
- 8:06>> it is desirable to do it responsibly.
- 8:08>> Right. Yes. Therefore,
- 8:10>> on how to do this correctly, we will
- 8:12talk about it in the second part. Let's
- 8:14follow the rules of the genre a little
- 8:16bit.
- 8:17You and I need to tell a few funny
- 8:18stories.
- 8:19>> What people run into, and why it is
- 8:21desirable in one way or another to first
- 8:23raise the tension, then explain how to
- 8:25do it right. Here is what. And you have
- 8:27already sketched out how to do it.
- 8:28>> I arrive, a complaint comes in from an
- 8:31owner, well, a new building, a complaint
- 8:33comes from a new...
- 8:34>> a new residential building.
- 8:35>> A residential building, a residential,
- 8:36apartment building. An apartment
- 8:37building. A complaint comes in from a
- 8:39property owner, from an apartment owner
- 8:41. The pipes are leaking, it was done
- 8:44poorly, bad, bad. Well, I arrive, open
- 8:46up the floors, let's see what you have
- 8:47there under the laminate. Like, the
- 8:48laminate swelled up, everything, chaos.
- 8:50And in there...
- 8:51>> Ah, uh, a small point right away, this
- 8:53is the client, he did the renovation
- 8:55himself,
- 8:56>> yes,
- 8:56>> and his laminate swelled up and the
- 8:58floors leaked. He calls you. My pipes
- 9:01are leaking.
- 9:01>> Yes, yes. The utility systems were done
- 9:04poorly
- 9:04>> in the house.
- 9:05>> Neighbors flooded the house, pipes are
- 9:07leaking, we start arriving, we start
- 9:09looking into it.
- 9:10>> Well, in short, the area is already
- 9:11opened up. Everything is already opened
- 9:12, that is, it's all prepared, the
- 9:13laminate swelled up, there are photos of
- 9:15the swollen laminate, everything, I
- 9:16arrive, he says he opened the area, well
- 9:17, he says there was mold and something
- 9:19else. That is, he starts, starts telling
- 9:21me. I say, let's remove the laminate a
- 9:22little bit further, let's look at how
- 9:24our pipes are there, where they go, and
- 9:25what's what. In short, we open up under
- 9:28the laminate for some reason. Well,
- 9:29apparently, they had some kind of super
- 9:31technology. Two sheets of gypsum, two
- 9:33sheets of plywood placed between each
- 9:34other. And these two sheets of plywood,
- 9:36well, apparently for soundproofing.
- 9:38Maybe someone just wanted something like
- 9:39conditionally wooden floors for
- 9:40themselves.
- 9:41Under this, these two sheets of plywood
- 9:43are overlapped and fastened with screws
- 9:45.
- 9:46>> Are you serious?
- 9:48>> Well. Well, accordingly, you can simply
- 9:50guess the rest. The guys, the finish
- 9:52workers, when they were laying all this
- 9:54, used screws that were nice and long so
- 9:55that the screed would hold firm—bang,
- 9:57bang, bang, bang, bang. And it's just a
- 9:59sieve, you know, made of pipes. There.
- 10:02Uh, accordingly, we had to open
- 10:03everything up in the hallway. We open up
- 10:04the floor screed. Well, naturally, a
- 10:06hole from a screw. Everything looks nice
- 10:07, everything is by the book.
- 10:08>> And what about the quality?
- 10:10>> Ah, oh.
- 10:12>> Oh.
- 10:12>> Oh.
- 10:14>> This is probably one of the most common
- 10:16stories that happens with buried utility
- 10:19lines, because anything we've poured
- 10:21concrete over is buried.
- 10:24>> Yeah, and they couldn't have verified
- 10:25that right away, could they? Because
- 10:27they were doing the renovation in the
- 10:28summer, when there's no need for heating
- 10:29, no need for anything. So, they got it
- 10:31done, screwed everything in, and then
- 10:33they turn the heat on. Da-da-da-da-da-da
- 10:35.
- 10:36Well, the system should have been
- 10:37pressure tested, right?
- 10:38>> Ah, well, apparently it wasn't really,
- 10:40the water wasn't really circulating
- 10:42there much. Maybe they didn't even touch
- 10:43the boiler. Well, they did the repairs,
- 10:45finished the work, then they came back.
- 10:47>> And hello.
- 10:48>> A super common story. The second most
- 10:51super common story is electrical.
- 10:53>> Yeah, the electrical stuff, that's...
- 10:55...
- 10:55>> that happens to every furniture
- 10:57assembler.
- 10:58If you are watching this video, my dear
- 11:00friend, and you've worked with your
- 11:02hands on construction sites, please
- 11:03write down the most insane stories
- 11:05you've had.
- 11:07A buddy of mine had a...well, his junior
- 11:10colleague didn't end up in the hospital
- 11:13, but he ended up with a nervous
- 11:15breakdown because he takes the tool, and
- 11:18they tell him: "There are no wires in
- 11:20the wall here."
- 11:22They had waved some kind of magical
- 11:24device around there. He starts hammering
- 11:27away with his rotary hammer and,
- 11:28naturally, the hammer kicks back at him
- 11:30.
- 11:31The building loses power because there
- 11:32shouldn't have been any, but for some
- 11:34reason, the main building power cable
- 11:35was running right there. They revived
- 11:37the guy, calmed him down, and said: "
- 11:39It's all good, we're moving over 20
- 11:42centimeters.""Are you sure? Is it right
- 11:43? Is there nothing there?" He starts
- 11:45drilling. Five minutes later, his rotary
- 11:48hammer kicks back again. He just sends a
- 11:50signal, leaves, and the building loses
- 11:52power again. And they go, "Oh, we also
- 11:54had one more cable."
- 11:56That was common building property, by
- 11:57the way. A week later, this guy comes
- 11:59back and says: "Did you check everything
- 12:00?""Yes."
- 12:02The company is standing there, maybe a
- 12:03manager or someone. Well okay, back in
- 12:05those days there weren't really any
- 12:06managers. Those were the days.
- 12:09>> So he says, everyone is standing there
- 12:10together, saying: "No, everything is f
- 12:11***ing great." The guy takes the rotary
- 12:14hammer and says: "Alright, there is
- 12:15definitely nothing here at all."
- 12:18He starts drilling. And they go: "Damn,
- 12:21we had a backup one there too." Exactly
- 12:24.
- 12:25I don't know what kind of perverse
- 12:27torture this is, because the whole
- 12:29building got caught in the crossfire.
- 12:33That guy quit construction. But that
- 12:36happens too. Utilities get buried.
- 12:40And these could be major power lines,
- 12:43not to mention punctured sewage, water
- 12:45supply, or networks; as you understand,
- 12:47you need to know where your utilities
- 12:49are.
- 12:51But there is one more point, which I
- 12:53mentioned at the very beginning about
- 12:55as-built documentation.
- 12:59Even in residential construction, you
- 13:01need to know, guys, you’re building a
- 13:04house based on one plan, and two years
- 13:07later, you get a brilliant idea to put a
- 13:10loft hatch in from inside the house.
- 13:15And the stories where people punch holes
- 13:18in load-bearing walls without
- 13:19reinforcing them, or adding openings
- 13:22without strengthening them, weakening,
- 13:24so to speak, some pillar.
- 13:27Like the story of, "Why the hell did
- 13:29they draw a brick column here in the
- 13:30middle of the room?"
- 13:33when they tore it down and the ceiling
- 13:35collapsed inward, or the structure
- 13:37started sagging because it turns out it
- 13:39was, damn it, a load-bearing column that
- 13:41all the beams—oops, all those floor
- 13:43slabs were actually resting on.
- 13:46Why are we talking about beams and floor
- 13:48slabs today? Recalling that story.
- 13:51You can, by ignoring the house's
- 13:54structure and not maintaining this
- 13:56as-built documentation, violate—how
- 13:59should I put it?
- 14:01—the very essence, the structure of the
- 14:03house. Especially when making
- 14:05adjustments to foundation work or adding
- 14:07extensions—blunders are everywhere.
- 14:10Not puncturing a sewer line while
- 14:11building an extension—that’s something
- 14:14that, in all likelihood, will be a
- 14:15rarity.
- 14:16Consequently, as-built documentation, as
- 14:19we have already figured out.
- 14:22This is not just a question of the near
- 14:24future, so you can finish your repairs,
- 14:26but so you can safely operate this house
- 14:29, and if necessary, reconstruct, expand
- 14:31, finish, or upgrade it.
- 14:34And moreover, since people are becoming
- 14:36more and more savvy now, when you sell
- 14:38your real estate—you decided to sell the
- 14:41house and move—if you have as-built
- 14:43documentation and you show people what
- 14:45it's made of, it will validate the value
- 14:48of your property.
- 14:49Because some friends are already
- 14:51predicting that this kind of situation
- 14:53might occur in the secondary market.
- 14:56You’re buying a house, and the person
- 14:59selling it, for the bank to approve the
- 15:01mortgage, will be told, "Hell, I don't
- 15:04believe that what you have is what's
- 15:06written in the BTI passport."
- 15:08The design is worthless. Either provide
- 15:11the as-built documentation or an expert
- 15:12report on the building structures. That
- 15:14will cost money. And at the same time,
- 15:17for those same banks, this documentation
- 15:19serves as confirmation that everything
- 15:21was done according to the blueprint,
- 15:23correctly and properly. And this
- 15:25preserves the value of your real estate
- 15:27. In other words, you can blow this off
- 15:29now, but you might regret it very much
- 15:32later. Accordingly, to avoid any regrets
- 15:34later, we need to understand how this is
- 15:36actually done.
- 15:36>> I can even give you some rough price
- 15:39estimates right now to add to that. Say
- 15:41, for a house of about 100-150 square
- 15:43meters.
- 15:44>> A set of as-built documentation, if you
- 15:46offload it to a contractor, will cost
- 15:48around 50,000 rubles. Well, just based
- 15:51on the latest estimate.
- 15:52>> Uh-huh. For the engineering systems. So
- 15:54, this whole package is prepared.
- 15:56>> An inspection for the same house would
- 15:58be 250,000 rubles.
- 15:59>> That's a slightly different price.
- 16:01>> A slightly different price.
- 16:02I mean, it's incomparable if we prepare
- 16:05these documents right away; the costs
- 16:08are completely different.
- 16:11And it's not a burden for the person
- 16:13doing the work, because they finish it
- 16:15immediately, mark everything, sign off
- 16:17on it, and move on.
- 16:19>> Alright, then we should figure out the
- 16:21next stage now. Which one? How, so to
- 16:24speak, the major construction companies
- 16:27do it.
- 16:28We have market leaders who do it like
- 16:30professionals, and then, say, the
- 16:32mid-range person who might have bought a
- 16:35design but doesn't hire anyone for
- 16:37supervision, managing the construction
- 16:40themselves.
- 16:41And for the really hardcore DIYers who
- 16:44built without blueprints, just by eye.
- 16:46They probably don't care anyway. Fine.
- 16:48No, we'll give them some advice too;
- 16:49we'll show them how it can be done.
- 16:50Let's start with the professional way.
- 16:53>> The whole thing.
- 16:54Since as-built documentation is a very
- 16:56important document, a house cannot be
- 16:58put into operation without it; the house
- 16:59being built cannot be commissioned
- 17:01without this set of as-built
- 17:02documentation, because...
- 17:04>> this includes multi-story residential
- 17:05buildings,
- 17:06>> yes, multi-story residential buildings,
- 17:07office buildings, anything that goes
- 17:09through the State Construction
- 17:10Supervision Inspection must go through
- 17:11as-built documentation.
- 17:13They arrive for an inspection, first
- 17:15look at the as-built documentation, and
- 17:17only then go to see the actual object,
- 17:19what has been built, or they do it in
- 17:21parallel. It just depends on what is
- 17:23more convenient for them. And without it
- 17:24, without the as-built documentation,
- 17:25you cannot hand over the object. Meaning
- 17:27you cannot put the house into operation
- 17:28so that people can move in.
- 17:30To this end, the Ministry of
- 17:32Construction and Rostekhnadzor have
- 17:34developed a large number of standard
- 17:36templates where everything is specified
- 17:38regarding what you must do and what the
- 17:40minimum set of documents you must
- 17:42provide is. Just everything at a minimum
- 17:45. They've even released it. Just imagine
- 17:47, they released it specifically so you
- 17:49don't have to look through scattered
- 17:51orders like this. SP, a code of practice
- 17:53. What to monitor? What kind of
- 17:56>> What’s it called? 543
- 17:58>> I’ve got SP 543
- 18:03>> The set of as-built documentation, what
- 18:05it should look like, the minimum
- 18:06operations to be carried out, and the
- 18:08oversight of construction control—
- 18:09everything is already written out.
- 18:11Just take it, read it, and follow this
- 18:14document. But it was released, well,
- 18:16recently. Well, how recent? Two years
- 18:18ago. As usual, everyone missed it, no
- 18:20one looks at it, no one pays attention,
- 18:22and they never bring these sets, these
- 18:25sets of as-built documents.
- 18:27I’m flipping through it now, checking
- 18:29the registry. Right, look, guys, I’m
- 18:31just opening the document, taking a
- 18:32screenshot, and saying: just fulfill at
- 18:34least what’s in this table. I’m telling
- 18:36you, I’m not asking for anything more
- 18:37than that. Just do the minimum required
- 18:40set. I mean, people are just too lazy to
- 18:41even open it.
- 18:42>> So it’s SP 500...
- 18:44>> 543 construction control. Well, there
- 18:46are a bunch of other numbers too. I
- 18:47don’t remember the exact numbers right
- 18:48now. There. But it’s SP 543 construction
- 18:51control. Cool. Then here’s a quick tip.
- 18:57Guys, those who are into professional
- 18:59construction and finishing—I’m not
- 19:02talking about, let’s say, fly-by-night
- 19:04crews, but anyone who claims to be
- 19:07serious in this world—let’s start
- 19:09getting used to the idea that if you’re
- 19:12building a house for someone for 10, 15
- 19:14, or 20 million, then just add the cost
- 19:17of hiring people to do the as-built
- 19:19documentation for 50k into your price,
- 19:21damn it.
- 19:23Yeah, well...
- 19:24>> Make it an add-on service for the client
- 19:26, hell, spread that cost out, it doesn’t
- 19:29matter. It covers your ass from legal
- 19:31proceedings; it can protect you from a
- 19:34lot, by the way. And at the same time,
- 19:37it gives the person confidence that you
- 19:39did the job properly.
- 19:41>> We...yeah, the whole point here is what
- 19:42? We aren't taking anyone’s side. Not
- 19:44the contractors' side, and not the
- 19:46clients 'side. Our main goal in what
- 19:48we’re talking about now is to make sure
- 19:50everyone is satisfied with the final
- 19:52service, which...
- 19:53>> that means everyone is dissatisfied.
- 19:54>> Yeah, yeah.
- 19:55>> Okay, actually, right now I am playing
- 19:56for the client's side, the homeowner
- 19:58who’s going to live there.
- 20:00>> Well, this is a huge plus for him too.
- 20:04What else is the point? You said, right
- 20:06, a 20-million house.
- 20:07>> Can I share a little pain?
- 20:09>> Go ahead.
- 20:10>> Something that, dammit, just happened to
- 20:11me recently. They finished all my
- 20:13electrical work, everything. But then
- 20:15the gate lighting went out. And the
- 20:17problem is, I had the gate installed
- 20:20along with the electrical work. By a
- 20:23third-party contractor.
- 20:24>> Uh-huh.
- 20:25>> But he didn't give me the documentation
- 20:26. I have everything for the electrics,
- 20:28except for that. And damn, we looked for
- 20:30it. Then we found out it was in the
- 20:33as-built documentation from the
- 20:35electrical contractor.
- 20:36It's just that I don't know a damn thing
- 20:38about electricity.
- 20:39He even included and noted that he had
- 20:40installed the relay that needed
- 20:42connecting, but the other contractor was
- 20:43supposed to connect it and didn't.
- 20:45So, accordingly, that wasn't reflected
- 20:47anymore. But in the as-builts, we
- 20:49eventually found
- 20:50>> that point.
- 20:51>> You just mentioned a house worth 20
- 20:53million, right?
- 20:54But do you know that even for work
- 20:56costing 600,000 rubles, there absolutely
- 20:58must be as-built documentation. That’s
- 21:01if we’re talking about something
- 21:02municipal. Moving a utility pole,
- 21:05>> the cost is, I don't know, 150,000
- 21:06rubles. They took everything, relocated
- 21:08it, removed it, moved it away, dug
- 21:11trenches. Be so kind as to provide the
- 21:12as-built documentation. That’s if the
- 21:14city requests it, but here you're
- 21:15talking about a 20 million house. Wow,
- 21:17that's something. I mean, it's
- 21:18incomparable because the individual
- 21:19housing market is wild. Everyone tries
- 21:21to do everything without control, just
- 21:24to get easy money and run off to some
- 21:26other project. Unfortunately, that
- 21:28happens too. Yeah. As-built
- 21:30documentation is really, really, really
- 21:31necessary. So, let's go over the
- 21:33necessary, the minimum set and map it
- 21:35out. Well, besides what they said should
- 21:38be there, yes, they’ll read that. But
- 21:40right now, let's say, for, like,
- 21:42>> the average person,
- 21:44>> in simple words, what is it actually for
- 21:46, and what should minimally be included
- 21:47in this document, and what is each one
- 21:49for?
- 21:50I’ll go through the minimum, the minimum
- 21:52documents now, so people understand why
- 21:54it’s needed. On a construction site,
- 21:56there must be at least two logs when
- 21:58carrying out construction and
- 21:59installation work. Or
- 22:01>> we’re talking about grown-ups now.
- 22:03>> Yeah.
- 22:03Not just...yes, listen, look, the
- 22:05general work log, the general work log
- 22:07is the log where, well, where the
- 22:09progress of construction is recorded.
- 22:11Meaning, who?
- 22:13>> Who is it? The contractor organization.
- 22:14>> The contractor organization, yes. The
- 22:15foreman must record every day what work
- 22:18he performed. If he didn't perform any
- 22:19work, it’s written there as such. No
- 22:21work was performed. And he puts his
- 22:23signature and the date.
- 22:25In this work log, the client can write,
- 22:27or the design supervisor, or...well,
- 22:30mostly the client.
- 22:31>> What the hell?
- 22:32>> Yeah. Right. No, here you can write: "
- 22:33You did this incorrectly, please clean
- 22:35up the trash after yourselves." Yeah.
- 22:36And put the date. So there is a column
- 22:38for that. There. Or, for example, you
- 22:41poured the concrete incorrectly, or
- 22:42didn't pour it right. In short, you can
- 22:44write down your comments. What is this
- 22:46for? This is, this is history. The
- 22:48history of the project's construction.
- 22:50Later, when, uh,
- 22:52>> we open the logbook, when, you know, you
- 22:54start saying "you didn't bring us" or "
- 22:56you didn't build on time," well, why
- 22:57didn't you? Everything is in the logbook
- 22:59, dates and everything are clearly
- 23:00written down.
- 23:01>> Let's all write it down together. It's
- 23:03called
- 23:04>> a general work log.
- 23:06>> General
- 23:07>> abbreviated as GWL. It really is the
- 23:09history of the project's construction.
- 23:11>> Yes, ideally it should be at every
- 23:13construction site.
- 23:14>> Yes,
- 23:15>> it is the history
- 23:16>> of your construction. Well, actually,
- 23:17yes, it even records things like the air
- 23:19temperature. Everything is recorded.
- 23:21>> Why the air temperature?
- 23:22>> What do you mean why? It started raining
- 23:24, efflorescence. Why were you working in
- 23:26the rain, just hammering away at the
- 23:27masonry? Why?
- 23:28>> I need to work faster, and the crew is
- 23:30standing around.
- 23:31>> There. There. Yes, the crew is standing
- 23:32, I rushed to get it done, not covering
- 23:34anything, nothing. And then the guy
- 23:35comes, and everything is running down
- 23:36like this, the mortar has only partially
- 23:38set. And, accordingly, all the "
- 23:39surprises" that come from that. Oh, yes
- 23:41. Oh, there. But here you can
- 23:42immediately say, "Guys, you did the
- 23:44masonry on this date, but look at that
- 23:46date." It was raining
- 23:47>> and minus 20, look at that,
- 23:50>> right? And minus 20 later. What are you
- 23:51doing? Why?
- 23:53>> You shouldn't interfere with their work
- 23:55process, but they must also understand
- 23:57what they are doing. The second log, the
- 23:59material incoming inspection log.
- 24:01It's very often neglected, but this log
- 24:04, well, we even did a video about
- 24:07material acceptance, remember? This is a
- 24:10very important document. If it's
- 24:11supplied material, that is, material
- 24:14bought by the client, or if the
- 24:16contractor buys it themselves, this log
- 24:18notes that the person responsible for
- 24:21construction at this specific site
- 24:23received the material from the client or
- 24:25brought it themselves and wrote that the
- 24:28material is good to go,
- 24:30>> yeah, yeah, good to go, we'll build on,
- 24:32yeah...
- 24:33>> well, so either they say, yes, note, the
- 24:36material is bad, I won't accept it.
- 24:39If they accepted the material, built
- 24:41with it, and then said, "Yeah,
- 24:42everything was broken and chipped, the
- 24:44material is crap, why did you even buy
- 24:45it?"
- 24:46What's the point, we could have used
- 24:47better stuff. "And we should have bought
- 24:49that other one instead." He'll say: "My
- 24:50friend, look, you accepted it yourself,
- 24:52you agreed to work with this material
- 24:54yourself." And
- 24:56>> did you accept it with no complaints
- 24:57about the quality of the material? None
- 24:59.
- 25:00If the material has a hidden defect, for
- 25:02example, some kind of hairline crack or
- 25:04something else, that is, it appeared
- 25:05later, then that's a claim for the
- 25:07material supplier.
- 25:09But why did you lay the slab with a
- 25:11crack in the first place? Well, that
- 25:13happened on a job site too. I arrive,
- 25:15and damn, the slab has a crack. Why did
- 25:17you lay it? They brought it from the
- 25:19factory. I say: "Where does it say that
- 25:20they brought you a cracked slab?" It
- 25:22doesn't. You accepted it. Accepted it.
- 25:24>> You broke it.
- 25:25>> It's your slab, you broke it, that's it
- 25:26, you broke it, you bought it. Well,
- 25:27they repaired it later.
- 25:29>> That costs money too,
- 25:30>> right? Well, yes, naturally, it also
- 25:31costs money. They chased the concrete,
- 25:33inserted reinforcement. There.
- 25:35So this work, I mean, this is also a
- 25:37very important document. Although often
- 25:39, even on large construction sites, well
- 25:41, it's becoming less common now,
- 25:42naturally, because this is a document
- 25:44that the State Construction Supervision
- 25:46is very strict about. These are the
- 25:48first two documents. They look at where
- 25:49the incoming inspection log is, that you
- 25:50accepted everything, that everything is
- 25:52confirmed to be fine, and the general
- 25:53work log. So these are two essential
- 25:55documents.
- 25:55>> In-incoming log, no.
- 25:58>> Incoming inspection log. Next comes the
- 26:00following document. Certificate of
- 26:02concealed works.
- 26:04>> Is it one for everything?
- 26:05>> No, it's for every single piece of work
- 26:07. Let's define what concealed works are
- 26:11. Is it like we were working, working,
- 26:13and nobody saw it?
- 26:14Is it like those virtual contractors: "
- 26:16Yeah, we've been working here for 3
- 26:17weeks, nobody showed up at the site, but
- 26:19this is concealed work because it's
- 26:20being prepared or not?"
- 26:22>> No, it's a little bit different. For
- 26:24example, the simplest thing: we lay
- 26:27electrical routes, then they get covered
- 26:30by plaster, we tie rebar, then it gets
- 26:32covered by concrete.
- 26:35So, concealed works are those works that
- 26:37are covered by subsequent layers or
- 26:39structures and which cannot be checked
- 26:41simply by, say, opening a lid and
- 26:43looking, "aha, everything is clear."
- 26:46Without destroying the structure or the
- 26:49finishing layers that lie on top of it.
- 26:51So, everything that we cover and cannot
- 26:54access is concealed work.
- 26:55>> All right.
- 26:57But nowadays there are super-technical
- 26:59tools, pew-pew lasers, sonars, you know
- 27:01, non-destructive testing equipment.
- 27:04>> I've already talked about this. 250,000
- 27:06rubles. for an inspection.
- 27:07>> Oh, it's expensive, so expensive,
- 27:08>> be my guest. Yes, so either buy the
- 27:10devices yourself individually. Same goes
- 27:12for rebar. All those guys running around
- 27:14with these fancy little beepers, saying
- 27:16everything is identified there,
- 27:17everything is wonderful. But for the
- 27:19most part, I've worked with many of
- 27:21these beepers, these things, both
- 27:23expensive and cheap, I've seen it all.
- 27:25Yeah. It's all nonsense. They work
- 27:27poorly, they work with large margins of
- 27:29error. The most accurate method to
- 27:30determine what kind of rebar is embedded
- 27:32in reinforced concrete is to break open
- 27:34the concrete.
- 27:36Break off a piece of the reinforced
- 27:37concrete, measure the rebar, and then,
- 27:39accordingly, start repairing it. This is
- 27:41the most reliable way.
- 27:42>> It's a frustrating way, because if
- 27:43everything is fine, you're like: "Why
- 27:45did I even break it?"
- 27:46>> We once had a shopping center we were
- 27:49building back in the day. The
- 27:52contractors finished the work and didn't
- 27:54present the hidden work to anyone. We
- 27:57said: "Okay, either hire an expert who
- 27:59confirms it for you, or open up the
- 28:01rebar and show us that everything is
- 28:03fine there." They hired an expert, and a
- 28:06guy ran around on this slab with a new
- 28:09device, beeping something. In short, he
- 28:11probably tried to figure something out
- 28:12for 3 days; in the end, they opened it
- 28:14up, broke it open, and then poured it
- 28:15again. But it doesn't get identified
- 28:17properly. Rebar is hard to identify
- 28:18because there are so many nuances. Metal
- 28:20sticking out here, a whole bunch of
- 28:22other stuff over there. That's why
- 28:23hidden works exist. For this, a
- 28:25certificate is drawn up.
- 28:26This certificate states what was done,
- 28:29what work was performed, and what
- 28:31materials were used.
- 28:33Well, for example, the rebar, 12mm rebar
- 28:36, such-and-such grade, and here is its
- 28:38passport. Here we poured it with
- 28:40concrete, and here is the passport for
- 28:41the concrete. And three people sign it:
- 28:43the client, the contractor, and a third
- 28:45person. If you have a design supervision
- 28:47contract, which I recommend everyone to
- 28:49do, there's also the signature of the
- 28:50design supervisor, who verifies that the
- 28:52client has inspected it. Aha, good, well
- 28:54, either they looked at it themselves,
- 28:55or hired a construction supervisor.
- 28:56>> Is it design supervision or construction
- 28:58control?
- 28:58>> These are two different people. Design
- 29:00supervision and construction control. So
- 29:02how
- 29:02>> four signatures then?
- 29:04>> No, look, if we take, if we take it
- 29:06seriously, what signatures should be
- 29:08there?
- 29:09There is a representative of the client
- 29:12for construction control issues. That is
- 29:15, the client can hire a person who will
- 29:17come. Then
- 29:18>> construction control can come.
- 29:19>> Well yes, construction control from the
- 29:21client. There you go. Then the
- 29:22contractor's representative, just the
- 29:24contractor's representative. And then
- 29:25the customer's representative for
- 29:27construction control issues. That is,
- 29:29the contractor must also have their own
- 29:30construction control. And here is the
- 29:32next person, this will be the fourth one
- 29:34, yes, this is the author's supervision
- 29:36.
- 29:36>> Uh-huh. Author's supervision is
- 29:38considered optional, well, that is, it's
- 29:40up to the customer whether to contract
- 29:42it or not. So. But I recommend it to
- 29:44everyone, because the author's
- 29:45supervisor will come and say: "You did
- 29:47this wrong here, and this part is a bit
- 29:49off."
- 29:50He looks at whether the completed work
- 29:53matches the design. And, accordingly,
- 29:55did you understand what just happened
- 29:57with this document? In this document,
- 29:59you can later simply look it up and see
- 30:01, aha, the concrete they laid is the
- 30:03right one. And the certificate was
- 30:05attached to it. So the person is
- 30:07confident that they have the right
- 30:08materials, here is the reinforcement,
- 30:10here is the certificate for it. And so,
- 30:12accordingly, everyone signed, everyone
- 30:14is involved, everyone saw everything. No
- 30:15one will say: "No, I didn't see anything
- 30:17. No, no, I don't know anything." Or "
- 30:18Yes, the concrete was different, they
- 30:20brought bad concrete." You signed the
- 30:23incoming control log, yes you did. You
- 30:24attached the certificate, yes you did.
- 30:26Buddy, you
- 30:26>> The concrete is good.
- 30:27>> The concrete is good, you just did a bad
- 30:29job with it.
- 30:30Well, that's what I'm saying, it makes
- 30:32all relationships transparent.
- 30:34And accordingly, no one is in the dark.
- 30:36Everyone came, talked, nodded their
- 30:37heads, but it's scary to put a signature
- 30:39if you just put a signature, saying that
- 30:41everything was fine there.
- 30:43But when you arrive and everyone takes a
- 30:45look: "Aha, sign that you did a good job
- 30:47, sign that you did it. Everything is
- 30:48correct." And the person immediately
- 30:50thinks: "Well, I'll fix this a bit, yes
- 30:52, I agree." Yes, yes, yes, this needs to
- 30:53be corrected.
- 30:55"Well, the responsibility falls, because
- 30:57an as-built survey, well, the full name
- 31:00is as-built geodetic scheme in
- 31:01construction, but they call it simpler.
- 31:04As-built scheme. It is
- 31:06>> why is it geodetic?
- 31:08>> Well, because according to the strict
- 31:10rules, it should be done by a surveyor.
- 31:13This is a person who works with
- 31:14measuring instruments, tachymeters,
- 31:16theodolites, levels, that is, those who
- 31:19are directly involved in measurements at
- 31:21the construction site.
- 31:23For example, a linear network, a sewer
- 31:25system is laid, they check all the
- 31:26elevations. Whether the building is laid
- 31:28out evenly, he sets up a total station,
- 31:30a level, or a theodolite, checks the
- 31:31angle, everything is fine, everything is
- 31:32aligned, the windows are in line.
- 31:35That is, this is already his zone of
- 31:36responsibility; he takes on the
- 31:37responsibility that everything is
- 31:39correct, that he performed all the
- 31:40measurements, everything is good, and he
- 31:42issues an as-built drawing here.
- 31:44There you go. More often it's done—well
- 31:46, on large construction sites, a
- 31:48surveyor is 100%working there. On small
- 31:50sites, like individual housing
- 31:51construction, the site manager himself,
- 31:52accordingly, makes these as-built
- 31:53drawings. They do it as follows. The
- 31:55project is taken, the sheet is pulled
- 31:57out, copied, or simply copied or printed
- 32:00. Nowadays, just PDF it and that's it.
- 32:02So you print the sheet and, in fact,
- 32:04right with a pen, he marks it." Okay,
- 32:07here it didn't turn out to be 2600 for
- 32:10me, but 2550, it shifted by 5 cm, the
- 32:13line veered off, "so he actually marks
- 32:16it as it was installed. Accordingly, he
- 32:19takes this as-built drawing and takes
- 32:21this report." Here, guys, is my passport
- 32:23, here's the second passport, here's the
- 32:26rebar. "" Look here, here is the
- 32:27as-built drawing. "" Everything is
- 32:29correct. "" It's done here exactly the
- 32:30same as on the paper. "Everyone says:"
- 32:32Okay, everything is correct, pour it,
- 32:35fill it, plaster it, close it up. "They
- 32:38folded it, put it away, and it sits
- 32:39there for 2 years.
- 32:41Then you go:" Damn, where was that
- 32:44backup cable of mine here?
- 32:46"There you go.
- 32:48It's taken out of the suitcase and
- 32:50opened." Ah, so, here is this reference
- 32:53point from the window. "" Aha,
- 32:54everything is clear. "There you go. And
- 32:56if you didn't check that there's a
- 32:57crooked reference point here, they wrote
- 32:592600 instead of 550, and you fell for it
- 33:01, well, that means you're the fool
- 33:03yourself.
- 33:04>> But why does it only sit for 2 years? It
- 33:05doesn't sit longer.
- 33:06>> Well, for example, I just said that
- 33:08conditionally, after 2 years,
- 33:09>> maybe 22 years. Well, it won't sit for
- 33:11anyone for 22 years. There you go. It's
- 33:13just that after 2 years you will 100%
- 33:14forget how everything was done, how the
- 33:16pipe was laid, how the sewage system is
- 33:17, where it lies in the ground, at what
- 33:19depth it lies, and where that wiring is
- 33:20, where the wire veered off or something
- 33:22else; somewhere here my wire veered, and
- 33:24here I ran it diagonally.
- 33:25But how? I mean, how can all this be
- 33:27taken? And all this, accordingly, is all
- 33:29recorded on paper. And everyone
- 33:31confirmed this. And the customer,
- 33:32including the customer, confirmed that"
- 33:33Yes, guys, yes, I confirm everything,
- 33:35everything is as it is. "You closed all
- 33:36the documents, reviewed everything,
- 33:38everything looks good. And this is where
- 33:39, my dear construction contractor, you
- 33:41have a better chance of getting paid on
- 33:42time.
- 33:43>> Yes. Well, yes. Accordingly, there is
- 33:44as-built documentation, and the
- 33:45inspection certificates for hidden works
- 33:46are signed. That is, the client, by
- 33:47signing the certificate, says:" That's
- 33:49it, I accept the work. "Or the client’s
- 33:51construction supervisor. That’s it, the
- 33:53work is accepted. Everything is good,
- 33:54guys, go ahead and pour.
- 33:56Later on, you won't get a letter, no one
- 33:57will say:" You did the reinforcement
- 33:59work poorly, here are 500,000 more
- 34:00complaints, "when everything is already
- 34:01poured.
- 34:02He says:" Wait, you accepted it, here is
- 34:04your signature. "You accepted it, you
- 34:05said everything was fine, you were
- 34:07satisfied. What questions could there be
- 34:08now? In short, it's insurance for the
- 34:10builders
- 34:11>> and, yes, for them as well. It is
- 34:13insurance for absolutely everyone. And,
- 34:14accordingly, transparent relationships.
- 34:16If, for example, you want to sell this
- 34:17house to someone later, as you say,
- 34:18through a bank or escrow, here is the
- 34:20set of as-built documentation. Here is
- 34:21everything we've done, here are all the
- 34:22signatures, here are all the passports,
- 34:24and here is what everything is made of.
- 34:25>> Good. We've covered the maximum level,
- 34:28let's say.
- 34:30How should things work when building a
- 34:32private residential house under a small
- 34:35contractor or with those" wild "crews,
- 34:38as you call them?
- 34:40>> Well, maybe not quite" wild, "maybe
- 34:42somewhat semi-civilized ones.
- 34:43>> It's simple here. Uh
- 34:46An incoming quality control log is
- 34:49mandatory. It's just insurance for
- 34:51everyone that you brought the right
- 34:52materials and that no one has any claims
- 34:54against them. That everything is just
- 34:56fine. It costs pennies at any bookstore
- 34:57or stationery shop.
- 34:58You can print it from the internet, just
- 35:00download it there, please, it's all in
- 35:02the free public domain—download, print,
- 35:04and sign.
- 35:06And if you don't need such a super-set
- 35:08of documentation, then you can at least
- 35:10settle for as-built diagrams, at least
- 35:12as-built diagrams. That is, we take them
- 35:14from the project just the same, we print
- 35:16out one sheet.
- 35:18If no engineering network project was
- 35:19developed, we just take the floor plan
- 35:21of our house, print it, and mark the
- 35:23networks on it.
- 35:25If you're doing it yourself, for example
- 35:27, or the foreman is doing it, they mark
- 35:29these networks, draw how they laid them
- 35:31, or you draw it after them; you went in
- 35:34, measured everything, and that's it—
- 35:36this document remains.
- 35:38So, this as-built diagram stays with you
- 35:40, you file it, and everyone signs it. If
- 35:42nobody wants to sign it and everyone
- 35:43refuses. Well, just keep it for yourself
- 35:46, file it away, and that's it. And it
- 35:48lies there just as calmly.
- 35:49>> And won't photo documentation help?
- 35:51>> That’s the most" hick "option. Third.
- 35:54>> Well, it has a right to exist.
- 35:55>> It has a right to exist. But what are
- 35:57the difficulties here? Like you said,
- 35:59the" hick "way—if you're building
- 36:00everything yourself, for example, you
- 36:02did it yourself, you don't want to draw
- 36:04it by hand, right...
- 36:05>> Well, you just put a tape measure there
- 36:06and took a photo.
- 36:07>> You put a tape measure there, or just
- 36:08laid down a piece of a ruler. So, you
- 36:10have an opening, a pipe runs through the
- 36:12opening, you put a metal ruler, a
- 36:13matchbox, any object that can always be
- 36:15measured and looked at. So, that's
- 36:17roughly how it turns out. Put it down,
- 36:19click, took a photo. On the wall,
- 36:21exactly the same. Put a box down, took a
- 36:23photo. Any material, any element that
- 36:25can later be measured to approximately
- 36:27determine the distance from the photo.
- 36:29>> Where are you going to get a standard
- 36:31box? I honestly have no idea.
- 36:32>> A lighter. I don't know what else.
- 36:35>> Well, a lighter isn't standardized. Not
- 36:37>> standardized.
- 36:38>> I think a ruler is still easier.
- 36:40>> And large, really super-large
- 36:41construction sites, right? I mean,
- 36:43besides the certificate for concealed
- 36:44works that we talked about, they also
- 36:46attach photos to them. Certificates,
- 36:48photos, statements of work volumes, what
- 36:50was done, with volumes and everything.
- 36:52And accordingly, there, well, everything
- 36:54is very serious, everything is very cool
- 36:55.
- 36:55>> Okay, let's put it this way.
- 36:57I understand that Kostya lives in an
- 36:59ideal world of pink ponies, and he
- 37:00always really wants everything to be
- 37:02just right.
- 37:03Well, that's his job. In reality,
- 37:05especially when building using the"
- 37:07do-it-yourself "method or with breaks in
- 37:09production cycles, it's very hard to
- 37:10keep track of all this, especially when
- 37:12contractors change or for small jobs.
- 37:15And what is that called? Well, when you
- 37:19hire someone, based on my observation
- 37:21and experience, what we at least
- 37:23recommend to people for construction.
- 37:26First, photo and video documentation of
- 37:28concealed works is mandatory—even for a
- 37:31good foreman, at the end of the day,
- 37:33checking that the rebar is laid properly
- 37:35.
- 37:36Here’s the photo and the video sent off
- 37:39. You came yourself, applied a tape
- 37:41measure, took a photo.
- 37:43It's accessible. This is accessible to
- 37:45everyone. Photo and video documentation
- 37:47. And one more fairly simple method. You
- 37:51probably even have design documentation
- 37:54as such. Maybe we developed it for you,
- 37:56maybe someone else did, maybe you bought
- 37:58a ready-made project somewhere. You can
- 38:00even adjust the settings.
- 38:03They laid out your utilities, like the
- 38:05sewer sleeve.
- 38:06You arrive, tape measure in hand, and
- 38:08say:" Guys, just shift this a little bit
- 38:11to the design mark, that's all. "They
- 38:13say:" Sure, no problem, we've moved it.
- 38:15"And if there are questions, you just
- 38:16mark an arrow indicating the shift to
- 38:18such-and-such. Took a photo, the project
- 38:22>> sewage, even if you just captured a
- 38:25photo on your phone, you already have a
- 38:28record and everything goes to a virtual
- 38:31disk, I mean, a hard drive." Virtual "
- 38:34isn't really the right word anymore.
- 38:35Accordingly, I saved it to the archive.
- 38:37And I certainly understand that an
- 38:40incoming material inspection log is cool
- 38:43, great, and all that, but at least
- 38:46collect the documentation you're given.
- 38:50Materials get delivered to you, get the
- 38:52passports and invoices. At least collect
- 38:55those, don't throw them away. I put
- 38:57everything into one big folder. I hope I
- 38:59never need to pull it up, but if I do, I
- 39:02have it all saved.
- 39:03That’s also a form of, strictly speaking
- 39:06, indirect control.
- 39:09>> Well yes, like you just said about the
- 39:11ideal world, that's one of my most
- 39:13frequent phrases on construction sites.
- 39:16Guys, I'm telling you what’s right and
- 39:18what’s wrong, you decide for yourselves
- 39:20.
- 39:22And, well, strictly speaking, yes, to
- 39:24all those who love to comment that" this
- 39:26isn't how it's done here, "well, go
- 39:28ahead and try it yourself.
- 39:30Yes, guys, the whole idea of" be your
- 39:33own construction supervisor "and these
- 39:35episodes with Kostya is to show that
- 39:37there is a slightly more orderly world
- 39:39out there.
- 39:41Why is there less fighting, fewer
- 39:43building collapses, problems, and wasted
- 39:46money there? Because people actually try
- 39:49not to repeat the mistakes that have
- 39:51been made thousands of times before in
- 39:53construction.
- 39:55All SNiPs, GOSTs, and safety regulations
- 39:57are written in blood and pain.
- 40:00That's how they are formed. In other
- 40:02words, when someone messes up, people
- 40:05decide:" To make sure this doesn't
- 40:07happen again, let's work in hard hats, "
- 40:10or" let's not grab a bare wire with our
- 40:13hands without checking if it's live. "
- 40:16>> But hard hats, honestly, that's just a
- 40:18huge pain. Because today I issued an
- 40:20order because people on the site are
- 40:21walking around without hard hats again,
- 40:23and there are no protective barriers in
- 40:25dangerous zones.
- 40:26>> So, all these standards really, in the
- 40:29first place, protect not just the
- 40:31contractor, the client, or the worker,
- 40:34they actually protect everyone.
- 40:37And yes, we're sharing this so you can
- 40:40at least understand which direction to
- 40:42look.
- 40:43And with that, my dear friend, you’ve
- 40:45already been given a hint. We tell you
- 40:47how it should be done, and you'll do it
- 40:49wrong on your own anyway. Gentlemen,
- 40:51hugs. Ladies, love you, kisses. See you
- 40:54next time. Bye.
About this transcript
This page contains the full transcript of Как строители хоронят ваши миллионы: скрытые работы и схемы by BDD GROUP, generated from the public captions YouTube serves with the video. The transcript has 7,757 words across 1,284 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.