  1. 0:00foreign
  2. 0:03[Music]
  3. 0:07thank everybody for coming out today
  4. 0:09this is um we're gonna have a public
  5. 0:11information meeting about the potential
  6. 0:13removal of the lower Collinsville Dam
  7. 0:16also known as the Collins Company Lower
  8. 0:18Dam my name is Ramona good I work I'm in
  9. 0:21the state Dam section for the
  10. 0:23Connecticut Department of energy and
  11. 0:25Environmental Protection so I'm just
  12. 0:27going to introduce some of the people
  13. 0:28that are going to be are here in the
  14. 0:30group and that will be presenting about
  15. 0:32the removal in the back working
  16. 0:35the PowerPoint is Charles Lee he's the
  17. 0:38assistant director for the state Dam
  18. 0:40safety programs
  19. 0:41then up front we have Matt gokowski he
  20. 0:45is our supervising Fisheries biologists
  21. 0:47then we have James Turek for Noah oh and
  22. 0:50Jake
  23. 0:51did it from Princeton Hydro
  24. 0:55so just little things oh we're trying to
  25. 0:58start promptly because the library does
  26. 1:00close at 8 30 so we need to be gone
  27. 1:04so thank you all right Chuck
  28. 1:08so we're just gonna go I'm gonna go over
  29. 1:10a little about what we're going to be
  30. 1:11talking about about the Dare I'm going
  31. 1:12to talk about the ownership the current
  32. 1:14conditions there's some historic
  33. 1:16photographs and when this dam was first
  34. 1:17built there was a sediment at sediment
  35. 1:20analysis site assessment Hydraulics and
  36. 1:23hydrology the next steps
  37. 1:26the federal Regulatory Compliance and
  38. 1:28benefits to the fish benefits to fish
  39. 1:31passage and the Fisheries
  40. 1:34so let's start with a little history
  41. 1:35about the Collins Company Lower Dam the
  42. 1:39as we know that maybe some of you don't
  43. 1:41know there's this lower Dam and then
  44. 1:43there's the upper Dam so the upper dam
  45. 1:45was first constructed in 1867 and the
  46. 1:48lower dam was constructed in 1912 with
  47. 1:51hydropower and the two Associated
  48. 1:53buildings there's a Gatehouse and a
  49. 1:55Powerhouse that is goes along with the
  50. 1:56dam in about 1965 the Collins company
  51. 2:00closed and the ownership of both the
  52. 2:03upper Dam and the lower Dam which
  53. 2:05transfer was donated to the state of
  54. 2:07Connecticut so since about the 1960s
  55. 2:09there have been no hydropower has been
  56. 2:11on that Dam
  57. 2:15so what does it mean that the state of
  58. 2:17Connecticut is the owner of the dam so
  59. 2:20dep Department of energy and environment
  60. 2:23Environmental Protection on the behalf
  61. 2:25of the state of all the dams that they
  62. 2:27own we are responsible for the
  63. 2:29day-to-day operation of Maintenance of
  64. 2:31the dams compliance with the regulatory
  65. 2:33regulatory requirements that means we
  66. 2:37have to comply with the same regulations
  67. 2:39that private Dam owners we would still
  68. 2:41have to apply for permits we still have
  69. 2:43to go through the dam safety process
  70. 2:45and we are also in charge of the
  71. 2:48oversight of any repairs upgrades
  72. 2:50constructions which end contracts
  73. 2:52Associated contracts with the dam that
  74. 2:55that includes removals
  75. 2:58so the dam is located in the town it
  76. 3:02spans the two towns of Avon and
  77. 3:04Burlington and it's located on the
  78. 3:05Farmington River a good portion of the
  79. 3:07Farmington River has been designated
  80. 3:09wild and Scenic uh that means in about
  81. 3:13the Earth the mid-1960s Congress passed
  82. 3:16the Wild and Scenic act which preserved
  83. 3:20or
  84. 3:21designated rivers that had outstanding
  85. 3:24recreational cultural and natural
  86. 3:28um values so that they want to keep so
  87. 3:30there's the upper wild in Scenic and
  88. 3:32there's a lower wild in Scenic and I
  89. 3:34think we might have some folks from this
  90. 3:35group here so if I you can correct me if
  91. 3:38I say anything wrong just you know that
  92. 3:40so uh the lower wild and Scenic can it
  93. 3:43consists of 61.7 Miles including the
  94. 3:46Salmon Brook water Watershed and the
  95. 3:49upper wild and Scenic which is about
  96. 3:5115.1 miles
  97. 3:53between the two dams the upper Dam and
  98. 3:55the lower Dam that is the exclusionary
  99. 3:57portion of the Farmington River so that
  100. 4:00area is not designated as wild and
  101. 4:02scenic
  102. 4:05so as I mentioned there's the upper Dam
  103. 4:08and the lower Dam the upper dam is
  104. 4:10located in Canton and was retrofitted
  105. 4:13for Electro power well hydropower and a
  106. 4:17new fish way which Matt will be talking
  107. 4:19about a little later on and there was a
  108. 4:23study done in 2011 that looked at the
  109. 4:25feasibility of putting hydropower on
  110. 4:28both the upper Dam and the lower Dam
  111. 4:31it was determined and I I'm not heavily
  112. 4:33involved with the upper Dam but it was
  113. 4:34determined for the lower Dam it was not
  114. 4:36economically feasible to put hydropower
  115. 4:39on the lower Dam a part of that putting
  116. 4:41hydropower on the lower Dam would
  117. 4:43include putting flash boards across the
  118. 4:45dam and raising the the water of the
  119. 4:47reservoir about three feet
  120. 4:49so this is one of the reasons we also
  121. 4:51want to remove the dam besides there's a
  122. 4:53major component fish passage there's
  123. 4:54it's not economically feasible at all to
  124. 4:56do hydropower
  125. 5:00so in about in about two 2001 2021 the
  126. 5:04state sent out a request for proposals
  127. 5:06for Consultants to prepare a conceptual
  128. 5:09phase one design for the removal of a
  129. 5:11dam and after competitive process
  130. 5:13Princeton Hydro was selected by the
  131. 5:15state to prepare conceptual design which
  132. 5:17was completed at the end of 2022 and we
  133. 5:21have Jake here from Princeton hydro and
  134. 5:23he's going to go over some of the
  135. 5:24results from the conceptual design
  136. 5:32thanks Ramona
  137. 5:35um my name is Jake dittus I'm an
  138. 5:37engineer with Prince and hydro
  139. 5:39um and Prince naidro is a consulting
  140. 5:41firm as Ramona mentioned we're made up
  141. 5:43of scientists and engineers and and
  142. 5:45we're working under the mission to
  143. 5:47change our ecosystems quality of life
  144. 5:49and communities for the better we have
  145. 5:52four teams four groups they've touched
  146. 5:54this project or will touch this project
  147. 5:56in different ways natural resource
  148. 5:58management Water Resources engineering
  149. 6:00which is where I sit on the team
  150. 6:02geosciences and and Regulatory
  151. 6:05Compliance
  152. 6:06um
  153. 6:09yeah next slide Chuck
  154. 6:11um I I'm I'm a little younger in the
  155. 6:14left picture there um but I'm not but
  156. 6:16not the only one on the on the team by
  157. 6:18any means Casey is uh meeting uh is on
  158. 6:22the zoom link he's a senior fluvial
  159. 6:25geomorphologist and is the technical
  160. 6:27lead on this project Jeff Gall is the
  161. 6:31director of our company or the head of
  162. 6:32our company and and is the engineer of
  163. 6:34record
  164. 6:36um next next slide
  165. 6:38and as Ramona mentioned we're working
  166. 6:40with deep and Noah and Prince naidro
  167. 6:43were making up the team who developed
  168. 6:45this concept for uh concept plan
  169. 6:48we work with uh ngos from Maryland
  170. 6:53through Massachusetts and and in
  171. 6:56Connecticut as well
  172. 6:58um ngos towns States and federal
  173. 7:02entities in order to do ecological
  174. 7:05restoration projects like this one
  175. 7:08yeah and so that brings us to the
  176. 7:10project goals the the main goal here is
  177. 7:13to eliminate a passage barrier to
  178. 7:16migratory fish
  179. 7:18um that we'll do that by removing the
  180. 7:20obsolete Dam and reconnecting a
  181. 7:22free-flowing ecological ecologically
  182. 7:24productive and natural River as Ramona
  183. 7:28talked about in the wild and Scenic uh
  184. 7:30Slide the you have a gem here with the
  185. 7:33Farmington River it's it's it's gorgeous
  186. 7:35and I'm sure most of you are here
  187. 7:38because of that reason and this is
  188. 7:40looking to expand that free-flowing
  189. 7:42nature developing additional spawning
  190. 7:46habitat for American Shad
  191. 7:48River Herring sea lamprey and American
  192. 7:52eel are the target species Matt will
  193. 7:54speak about that in in detail later on
  194. 7:56but the goal of this project centers
  195. 7:59around that fish passage component and
  196. 8:02that's that's where that's what Noah is
  197. 8:04interested in that's what Connecticut
  198. 8:05deep is interested in and and obviously
  199. 8:08that's what we're accidents so that
  200. 8:10that's kind of our Guiding Light for
  201. 8:11this design
  202. 8:15um you are probably here because you
  203. 8:17know where this dam is but in case you
  204. 8:19don't
  205. 8:20um the the upper dam is is up here
  206. 8:25that's what uh where Ramona mentioned
  207. 8:27this is the lower Dam Avon is on the
  208. 8:30East and Burlington is on on the west
  209. 8:32side of the river there's the the
  210. 8:35Farmington Canal Greenway that in this
  211. 8:39area that you may have seen the dam from
  212. 8:42um so that's that's where the the
  213. 8:45project is located
  214. 8:51oh there we go wow that was close
  215. 8:58so as Ramona mentioned there's a few
  216. 9:01different component
  217. 9:01am
  218. 9:03um obviously we have the the spillway
  219. 9:05which is what you see across the river
  220. 9:08that's 300 feet wide on the river right
  221. 9:12side the Burlington side are the dam
  222. 9:15abutment stands pretty high you can see
  223. 9:17from the Farmington Canal Greenway what
  224. 9:20that looks like and then if you look
  225. 9:22across if you stand on that bank and
  226. 9:24look across the river you'll be able to
  227. 9:25see the gate house where which
  228. 9:28historically
  229. 9:29allowed impounded water to flow into the
  230. 9:33Raceway and then down through the
  231. 9:35PowerHouse which when the dam was in
  232. 9:37operation generated power so that's what
  233. 9:39the site looks like
  234. 9:40um in a at a well I don't know what
  235. 9:42scale this is but at a at a high scale
  236. 9:46um
  237. 9:47and a couple photos will follow your
  238. 9:50good Chuck
  239. 9:51so this is uh if you're standing on the
  240. 9:55the Farmington Canal Greenway looking
  241. 9:57across the river you see the gate house
  242. 10:00um and obviously the spillway that that
  243. 10:02concrete retaining wall holds the the
  244. 10:05Raceway so the Raceway is behind that
  245. 10:07and then out of the picture Downstream
  246. 10:10is like is that Gatehouse if you're
  247. 10:12standing here looking across you'll see
  248. 10:16um the Farmington Canal Greenway and the
  249. 10:18in the river right abutment
  250. 10:20um
  251. 10:22so that's what it looks like as an
  252. 10:24engineer I think it's I have to geek out
  253. 10:27over old plans this is from the 1912.
  254. 10:30um uh design of the dam this is in plan
  255. 10:34view so that that looking you know from
  256. 10:36an Ariel looking down onto the dam we
  257. 10:39have the 300 foot Spillway the river
  258. 10:42right abutment and the river left uh
  259. 10:45Gate House and Raceway in this picture
  260. 10:48um and then if you're if you can imagine
  261. 10:50the dam being a cake and cutting it at
  262. 10:52the B2B at this location
  263. 10:56um you'd see what the profile of the dam
  264. 10:58looks like it's an OG Spillway with the
  265. 11:01with all concrete and the important
  266. 11:04thing for our design the concept design
  267. 11:07was this little note here that says
  268. 11:09Bedrock so this is this dam is tied into
  269. 11:13Bedrock
  270. 11:14um and you'll and we can see it in the
  271. 11:16in the next slide which is the
  272. 11:20cross-section view of the dam yeah
  273. 11:22please well you can't really see but you
  274. 11:25gotta trust me about this black line is
  275. 11:27talking about Bedrock or points to
  276. 11:29bedrock
  277. 11:31um
  278. 11:32what why that is important for us is
  279. 11:34because one in in the 1900s when they
  280. 11:37built this Dam
  281. 11:39um they manipulated that underlying
  282. 11:41bedrock in order to construct the dam on
  283. 11:43on top of it and and key it into place
  284. 11:46and then
  285. 11:48um two for us when we remove if if we if
  286. 11:51the dam goes to removal and is removed
  287. 11:53that Bedrock will become a control point
  288. 11:56for the river there there's no elevation
  289. 11:58difference there that's going to happen
  290. 12:00that Bedrock is locked in place and so
  291. 12:02it's important for us to know
  292. 12:04um that and so we had the jackpot in
  293. 12:07this design or in this um with these
  294. 12:10documents not only did we get plans but
  295. 12:12we got some really cool historical
  296. 12:14photos from the Burlington Library
  297. 12:18um
  298. 12:21come on I've got it
  299. 12:24um so this this is a from 1910 1912
  300. 12:29um during the construction of the dam
  301. 12:31this is the river bright abovement so
  302. 12:33you may have been looking at it from
  303. 12:36that that Canal Farmington Canal
  304. 12:38Greenway
  305. 12:40um
  306. 12:40it's it's pretty impressive that they
  307. 12:43had that they documented this
  308. 12:46um there's the sluice Gates that are uh
  309. 12:48that are boarded up in this picture and
  310. 12:50you can see the different lists of
  311. 12:52concrete
  312. 12:53um making the final Spillway height this
  313. 12:56is the final Spillway height and that's
  314. 12:57the first floor
  315. 12:59um but you can see all the Bedrock that
  316. 13:02has been manipulated and in this area to
  317. 13:05allow for that concrete uh pouring of
  318. 13:08that Dam so it's a pretty cool picture
  319. 13:11um you can go to the next one Chuck
  320. 13:14this is uh
  321. 13:16this is and just another another cool
  322. 13:19picture is kind of like the Model T of
  323. 13:22excavators or something like that
  324. 13:24and then we got a railroad line to move
  325. 13:28materials
  326. 13:29um and then and you can see here this is
  327. 13:32a call for Dam
  328. 13:35um this is looking from the East uh at
  329. 13:37the dam under construction
  330. 13:40um and then you can also see just all
  331. 13:43the ropes and pulleys system here to to
  332. 13:45move uh construction equipment around so
  333. 13:47a pretty cool that that we have this
  334. 13:50shot and then the next shot is pretty
  335. 13:52similar
  336. 13:54um we we can see a coffer down this is
  337. 13:57that uh Bedrock on the river right side
  338. 14:00this one is a this is the canal or the
  339. 14:03Farmington uh Canal now but it was is
  340. 14:07now what it was a railroad at that time
  341. 14:09obviously
  342. 14:11um and the other point of emphasis here
  343. 14:13is is how is that the channel is uh much
  344. 14:17smaller than what how wide it is now
  345. 14:20um it's been a little bit wide and next
  346. 14:23next picture and this is the last of the
  347. 14:25of the historical tour
  348. 14:28um just another example of the offer Dam
  349. 14:30that they used to keep the open area dry
  350. 14:33this is looking at from view from the
  351. 14:37West
  352. 14:38um of the project study under
  353. 14:40construction
  354. 14:43so what's all that looked like today
  355. 14:46um this is looking from on the river
  356. 14:48left side this is that uh the concrete
  357. 14:51retaining wall for that Raceway the the
  358. 14:55it poses a nice background for some
  359. 14:58graffiti artists
  360. 15:00um and uh the spillway and then that is
  361. 15:02the Gatehouse from looking Downstream to
  362. 15:05Upstream
  363. 15:08this is inside that Gatehouse
  364. 15:11um these are the the gate this is the
  365. 15:15exit so water would come in from the
  366. 15:17other side of the building flow
  367. 15:19underneath uh through the gates and uh
  368. 15:22into the Raceway
  369. 15:23um these are what the the structures
  370. 15:26that would control the elevation of the
  371. 15:28gates and and change the water how much
  372. 15:30water was allowed to come in and out
  373. 15:33um
  374. 15:34that's that's uh Casey who excludes uh
  375. 15:37on on Zoom but uh that he was there in
  376. 15:41person
  377. 15:42um yeah next slide
  378. 15:45this is the Raceway so we're standing in
  379. 15:47the in the Gatehouse looking Downstream
  380. 15:50water would flow through here uh in the
  381. 15:53next slide
  382. 15:55into the PowerHouse so this is um down a
  383. 15:58little bit Downstream with the dam now
  384. 16:00water would flow from the Raceway into
  385. 16:02the uh Channel generating power in its
  386. 16:06prime
  387. 16:07next slide
  388. 16:09so that was kind of a tour of the site
  389. 16:12and a historical tour now I'm gonna talk
  390. 16:15through the concept design that
  391. 16:18um and and kind of the steps that went
  392. 16:20into that
  393. 16:21um the we I won't I'll I won't really
  394. 16:24touch on the wealth and delineation or
  395. 16:26the topographic survey
  396. 16:28um but that those were completed uh by
  397. 16:31our sub contractors and then the metric
  398. 16:34mapping went into the sediment
  399. 16:37assessment and settlement assessments uh
  400. 16:39pretty important both the quality and
  401. 16:40quantity and I'll touch on that uh in a
  402. 16:43for a few slides and then the site
  403. 16:46assessment of the existing buildings the
  404. 16:49hydrologic and hydraulic modeling and
  405. 16:51the uh in the concept where we ended up
  406. 16:53with the conceptual design plan
  407. 16:57so the the settlement assessment is
  408. 17:00important because
  409. 17:01um Rivers move are obviously water what
  410. 17:04we can see is moving water but it's also
  411. 17:07moving this underlying sediment and so
  412. 17:09when a dam is in place not only is the
  413. 17:11water backed up but it creates a
  414. 17:13sediment trap for uh impounded sediment
  415. 17:17to fall out at the dam and so
  416. 17:19understanding whether that sediment
  417. 17:21behind the dam is uh is more or less
  418. 17:25contaminated than Downstream and
  419. 17:26Upstream reaches the background reaches
  420. 17:29of the of the channel are really
  421. 17:31important and so
  422. 17:33um we Prince nidro developed a suddenly
  423. 17:36sampling plan and got it approved by
  424. 17:38Deep like some supplements seven seven
  425. 17:41samples
  426. 17:43um one Downstream of the Damned and and
  427. 17:46one in the upper impoundment in order to
  428. 17:48identify some background levels and then
  429. 17:51um five through the in the heart of the
  430. 17:53impoundment
  431. 17:55um we collected the samples through from
  432. 17:59a downvote uh using the stainless auger
  433. 18:01using the EPA decontamination protocol
  434. 18:04so this was at the end of a of a long
  435. 18:07stainless steel rod where we drilled in
  436. 18:10um to the Earth uh between us deep in
  437. 18:13the unconsolidated sediment as as I
  438. 18:16could get it which was a couple feet
  439. 18:20um and
  440. 18:22um and then we tested brought those
  441. 18:24samples to the lab tested it for Metals
  442. 18:27semi-volatiles docs PFA pfas pesticides
  443. 18:32herbicides pcbs chromium Cyanide and
  444. 18:35hydrocarbons these are this is the
  445. 18:37pretty standard Suite of of analytes
  446. 18:40that we do in all dam removal projects
  447. 18:42all projects that involved dredging and
  448. 18:45sediment in in rivers in waterways
  449. 18:51next slide please
  450. 18:53and so we
  451. 18:55um so we look at those and that list of
  452. 18:57analytes and compare it to the
  453. 18:59ecological and human health criteria
  454. 19:02um the Connecticut residential direct
  455. 19:04exposure criteria is pretty conservative
  456. 19:07because it takes into account 30 years
  457. 19:09of daily exposure
  458. 19:12um and so that's what that that's a
  459. 19:14human health criteria
  460. 19:16um then the the NOAA uh threshold effect
  461. 19:19concentration for and probable effect
  462. 19:22concentration our ecological criterias
  463. 19:24the Tec is is a threshold below which we
  464. 19:28don't expect to see any uh harm to the
  465. 19:31environment
  466. 19:32um the PEC is above which with there may
  467. 19:36be an impact to the uh the underlying
  468. 19:39ecology and then
  469. 19:41um the groundwater class GA pollutant
  470. 19:44Mobility criteria these are all
  471. 19:46mouthfuls um but I'm I'm providing the
  472. 19:49background information for you the the
  473. 19:52um the in in this area the groundwater
  474. 19:55is considered uh class GA which means
  475. 19:58that it can be used for residential or
  476. 20:00consumption without any treatment and so
  477. 20:04we this is a criteria that just makes
  478. 20:06sure that the groundwater is getting
  479. 20:07protected and there's no leaching
  480. 20:09happening
  481. 20:10um and so
  482. 20:12uh with that you can you can kind of
  483. 20:15forget that slide because the important
  484. 20:17slide is that is next
  485. 20:20where um the majority of contaminants
  486. 20:23were not detected or detected below
  487. 20:25corresponding ecological and human
  488. 20:27health criteria
  489. 20:29um there were a few exceedances related
  490. 20:31to the urban runoff that we see
  491. 20:34um but this was not something that
  492. 20:37um oh but it matched the background
  493. 20:39levels for the whole system and so
  494. 20:42um overall the the results indicate that
  495. 20:45the impoundment
  496. 20:46the impounded settlement does not cause
  497. 20:48an elevated risk to humans or water
  498. 20:50resources and it's and and the results
  499. 20:53support either the on-site handling of
  500. 20:55the sediment or the passive release to
  501. 20:58Downstream reaches as the dam is removed
  502. 21:03yeah
  503. 21:05so that was for sediment quality
  504. 21:07sediment quantity is important to make
  505. 21:10sure that if the Dam's room is removed
  506. 21:12or God forget God forbid gets blown out
  507. 21:15and the sediment is released making sure
  508. 21:18that the quantity is not something that
  509. 21:20would suffocate the downstream ecology
  510. 21:22and and get brought into the stream and
  511. 21:25and would be able to be utilized as
  512. 21:28positive bed load
  513. 21:30um so to to map out the quantity of
  514. 21:34um of sediment We performed about the
  515. 21:35metric survey using a Sounder measuring
  516. 21:39the top and bottom of that
  517. 21:40unconsolidated sediment you can see this
  518. 21:42is a map showing the results
  519. 21:44um it basically it was zero to five feet
  520. 21:48throughout the empowerment of
  521. 21:49unconsolidated seven minutes
  522. 21:51unconsolidated sediment it's not an
  523. 21:53efficient sediment trap meaning that you
  524. 21:56know the water depth here is is about
  525. 21:58what it will be in when the dam is
  526. 22:01removed it might widen a little bit the
  527. 22:04channel might widen a little bit but
  528. 22:06it's not like there's a whole pile of
  529. 22:08sediment here we're seeing uh in in this
  530. 22:11inner Bend like five or so feet as the
  531. 22:14max of of the depth of of sediment and
  532. 22:18so
  533. 22:19um we we estimated uh that that the
  534. 22:23sediment impounded behind the stand to
  535. 22:25be about 18 000 cubic yards which
  536. 22:28um probably doesn't mean anything to you
  537. 22:30guys but what it does mean is that it's
  538. 22:32less than a year of the estimated animal
  539. 22:36sediment yield which means that the
  540. 22:38river without a dam being there would
  541. 22:40mobilize about three times that at least
  542. 22:44three times that volume on its own and
  543. 22:47so that being with that in mind the
  544. 22:50sediment if it was passed through
  545. 22:52passively released would be able to be
  546. 22:55absorbed into the downstream Channel
  547. 22:57without any impacts to muscles or other
  548. 23:00ecology Downstream
  549. 23:03um and and so at this point the the
  550. 23:06method of of dealing with the seven and
  551. 23:09the sediment management is is uh is
  552. 23:11proposed passive release is is what
  553. 23:14we're proposing what does that mean when
  554. 23:16it's at home what does it mean to play
  555. 23:18in English then
  556. 23:21um passive release means that
  557. 23:23um with the letting the uh letting the
  558. 23:26sediment go Downstream and move
  559. 23:27Downstream
  560. 23:29um without using uh so the dam will be
  561. 23:31removed by big yellow machines but the
  562. 23:34yellow machines will not go up into the
  563. 23:36impoundment and and scrape off you know
  564. 23:38this sediment and move it somewhere
  565. 23:41um it will be just able to migrate
  566. 23:44Downstream and transport it naturally as
  567. 23:46if the river was
  568. 23:48um you know as if it was a natural
  569. 23:51transport process
  570. 23:53is that is that English enough
  571. 23:55it's closer closer all right thank you
  572. 24:03um so the takeaway is that sediment
  573. 24:04quantity also not a not an issue in this
  574. 24:07case it uh would not harm the ecology
  575. 24:09Downstream
  576. 24:11um so for the site assessment of the
  577. 24:14existing buildings
  578. 24:16um we are our subcontractor did this and
  579. 24:20looked and found um due to the age of
  580. 24:22the of the structures asbestos materials
  581. 24:26in um in the roof and the floor of the
  582. 24:28PowerHouse LED uh in the debris and wood
  583. 24:31framing of the PowerHouse and Gatehouse
  584. 24:34but not pcbs and so uh obviously that
  585. 24:38leads to
  586. 24:39um a responsible you know we need a
  587. 24:41responsible disposal plan that
  588. 24:44potentially hazardous material that with
  589. 24:46that uh Asbestos and Lead will be
  590. 24:49considered such and and disposed of
  591. 24:52properly the painted brick will be
  592. 24:55considered solid waste and disposed of
  593. 24:56off-site and then and the concrete and
  594. 24:59unpainted brick is is proposed to be
  595. 25:03buried on site at this point
  596. 25:05are you gonna have questions and answers
  597. 25:07at the end or yes absolutely yeah yeah
  598. 25:18um it removed the two buildings will be
  599. 25:20removed um the Raceway will be filled
  600. 25:22with with Dan material
  601. 25:25the okay so the government
  602. 25:28yes the two buildings yeah yeah
  603. 25:3318
  604. 25:35000 yards of material yeah to the common
  605. 25:39person that doesn't conceptualize what
  606. 25:41that is you see a big tri-axle truck
  607. 25:43going down the road that holds 18 yards
  608. 25:46yeah 18 yards they're talking about 18
  609. 25:50000 yards that's just going to free flow
  610. 25:52down the river for one the burying on
  611. 25:55site
  612. 25:56now you skipped over all the property
  613. 25:58owners around that where are you going
  614. 25:59to bury it because the road and the
  615. 26:01property all along the river is owned by
  616. 26:04MDC
  617. 26:06eversource and the state of Connecticut
  618. 26:10so there's not one section that you can
  619. 26:13go
  620. 26:14and dig a bay hall there's three
  621. 26:16Property Owners involved in this yep yep
  622. 26:19and we're we're working with the those
  623. 26:21Property Owners
  624. 26:22um to and and Ramona can speak to that
  625. 26:26status a little bit more but we're
  626. 26:27working with them they're all aware
  627. 26:29connected deep obviously is aware of the
  628. 26:31project they're they're here but what
  629. 26:33I'm saying is if you're proposing that
  630. 26:35you're going to bury it on site it
  631. 26:36already has to be in a plan that you
  632. 26:37have developed yep I'll get to it
  633. 26:41um yeah I'll show I'll show where it is
  634. 26:43um give me two slides yeah uh all right
  635. 26:46Chuck
  636. 26:49so the H H
  637. 26:51um analysis the the height uh that were
  638. 26:53the hydrology and hydraulic analysis is
  639. 26:57is uh is twofold it has two goals one is
  640. 27:01to understand what the uh storm flows uh
  641. 27:05look like
  642. 27:06um before and after the dams removed and
  643. 27:09then two uh looking at the fish passage
  644. 27:11flows the whole idea is to allow for
  645. 27:13fish passage and so we we wanted to make
  646. 27:17sure that that it looks possible after
  647. 27:19the dams removed and so uh the the flows
  648. 27:22here
  649. 27:23um are uh are are a little bit
  650. 27:26determined by the Upstream releases from
  651. 27:29the MDC
  652. 27:30um and so we looked at that to we
  653. 27:33studied that to look at the hydrology
  654. 27:34the amount of water through the system
  655. 27:37um and then the hydraulic analysis where
  656. 27:40this is a this is a screenshot of hecraz
  657. 27:42a profile and hecaris and uh what we see
  658. 27:45in the storm flows is uh pretty common
  659. 27:48among Dam removals
  660. 27:50um the existing the 100 Year existing uh
  661. 27:53water surface elevation oh so back up
  662. 27:57this is a profile
  663. 27:59um this here's the dam this is looking
  664. 28:01up River at the impoundment up to the
  665. 28:03pedestrian bridge and then the upper Dam
  666. 28:06um so what we see for the 100 Year storm
  667. 28:09under existing editions is that the
  668. 28:10water surface is backwatered up to the
  669. 28:13base of the upper Dam in proposed
  670. 28:16conditions this the green line will see
  671. 28:18it as a free-flowing river and so water
  672. 28:21surfaces is reduced a little bit in the
  673. 28:23in the flood
  674. 28:25um in the flood flows yeah so locally
  675. 28:29reduced flooding a bit and then we also
  676. 28:32check the the fish passage flows and
  677. 28:34made sure that there was sufficient
  678. 28:36water depth and uh reduced and and
  679. 28:39velocities were suitable for fish
  680. 28:42passage which they are
  681. 28:44um otherwise
  682. 28:45we wouldn't be here and Jim wouldn't be
  683. 28:48here
  684. 28:49um so that is uh that's what we're
  685. 28:52looking at with the H H assessment and
  686. 28:55then um we'll get I think the next slide
  687. 28:57is the concept design so the idea is to
  688. 29:02remove as much the the attendance of the
  689. 29:05concept designs to remove as much
  690. 29:06Spillway as as possible and feasible to
  691. 29:09achieve the project goals of fish
  692. 29:11passage to remove the
  693. 29:14the funk Gatehouse and Powerhouse to
  694. 29:17fill the Raceway with damn materials to
  695. 29:19the extent feasible
  696. 29:21um and minimize the natural resource and
  697. 29:24historic resource impacts of the site
  698. 29:26and to restore the floodplain with
  699. 29:29Native Plant community and plant on some
  700. 29:32native plants along the now exposed
  701. 29:35floodplain
  702. 29:41what's the red oh yeah so this is the
  703. 29:45um this is the area of this is this
  704. 29:47would be the access way and then this is
  705. 29:49the area of uh potential of of the
  706. 29:53project area basically and so the access
  707. 29:55way is is
  708. 29:56um using this
  709. 29:58is supposed to use this Northern route
  710. 30:00which does cross the MDC uh easements
  711. 30:04and then
  712. 30:06um the the it extends down to the
  713. 30:10Gatehouse and the PowerHouse as well as
  714. 30:12the dam
  715. 30:13um in order and then some of the some
  716. 30:16some of the lower impoundment
  717. 30:19reception
  718. 30:22where's the flood plain that you're
  719. 30:24going to be restoring with Native Plant
  720. 30:26what happens to the size of the river
  721. 30:29yeah this is Farmington River yeah yeah
  722. 30:34so um the dam is about 300 feet wide
  723. 30:39um and so so that's fair scale
  724. 30:42um the the natural thankful width of the
  725. 30:45channel is it's gonna is about 120 feet
  726. 30:48and so we'll
  727. 30:50um it's a little overly widened here and
  728. 30:53and so we'll shrink to you know what the
  729. 30:56what the downstream not strength but it
  730. 30:58will narrow to what the downstream reach
  731. 31:01looks like
  732. 31:02um and so what so so it will hug you
  733. 31:05know it'll it'll be something like like
  734. 31:07the slide and so the floodplain will
  735. 31:10become exposed
  736. 31:12um and that's as it as the dam lowers
  737. 31:14and the flood plain become exposed
  738. 31:16that's what that's the flood plain that
  739. 31:18we'll be um planting so is it mostly on
  740. 31:21the um
  741. 31:22Eastern side yeah where we're going to
  742. 31:26lose
  743. 31:27we're not getting shrinkage I guess or
  744. 31:29we're gonna lose
  745. 31:30width it's going to be on the Eastern
  746. 31:33side
  747. 31:33yes um well it depends on on it'll be
  748. 31:37most primarily the the outer bends will
  749. 31:40stay the same of the river so if you're
  750. 31:42looking at this we have a couple Meander
  751. 31:44bands in the river and and so the outer
  752. 31:47bends will will remain
  753. 31:49um pretty consistent and then the the
  754. 31:51the
  755. 31:53um inner Bend is where the floodplain
  756. 31:55will become exposed and then on as it
  757. 31:58transitions over this little this has
  758. 32:00likely become a riffle where it on both
  759. 32:03sides will become
  760. 32:05have a little more exposed for the plan
  761. 32:07so it's going to kind of go from being a
  762. 32:09lake to a river exactly it'll look very
  763. 32:12similar to the downstream reach yep so
  764. 32:14one way to say it uh
  765. 32:16Jake has said the floodplain isn't
  766. 32:19necessarily exposed it's putting back
  767. 32:21the original flood plain that had been
  768. 32:23there and hopefully don't you know it'll
  769. 32:25restore itself yeah over time like as
  770. 32:27Jake said I mean there's a sediment
  771. 32:29movement of sediments to the system and
  772. 32:31so over time like you said on the inside
  773. 32:34of the bend you you'll tend to have
  774. 32:36accretion of sediment and therefore the
  775. 32:38flood plain will build itself back where
  776. 32:41it's not a lake yeah yeah thanks Jim and
  777. 32:45and the cool thing about that is is the
  778. 32:48set this uh impounded sediment that will
  779. 32:51become re-exposed has a native seed bank
  780. 32:54from when the dam was was you know 100
  781. 32:56years ago when the dam is there and it's
  782. 32:58just been sitting there and that's in
  783. 32:59the soil waiting for light and when it
  784. 33:01becomes re-exposed we've seen over time
  785. 33:04and time again in that first growing
  786. 33:05season it'll it'll pop up with it with
  787. 33:08an awesome array of uh Native seeds
  788. 33:13just to go back to the when you were
  789. 33:16looking at the gradient it looks like
  790. 33:17there's pretty it looked like I read
  791. 33:19that right there's 30 feet of gradient
  792. 33:21or so in about a mile and a half yeah
  793. 33:24expecting to be continuous yeah pretty
  794. 33:27continuous yep yep so it should be
  795. 33:29moving along through that whole area
  796. 33:31without an extension section yep yep yep
  797. 33:37yeah that's
  798. 33:39um
  799. 33:40in the area between the upper Dam and
  800. 33:43the lower damage what you call the
  801. 33:44impounded area yep yep it's like that
  802. 33:46area in the impoundment area
  803. 33:48um
  804. 33:49what do you anticipate the width to go
  805. 33:51from to from the depth you know from
  806. 33:54into
  807. 33:55yeah
  808. 33:56um so that the depths will I
  809. 34:00um the the bank will depth for this
  810. 34:02river is about six feet and so it will
  811. 34:04be uh probably there will be some pools
  812. 34:07and and so it's you know I we can't say
  813. 34:10the exact location but you know around
  814. 34:12six feet from right now it's about 12
  815. 34:15feet deep in the deepest part of that
  816. 34:17um of that of of what I'm calling the
  817. 34:19impoundment which is the pool behind the
  818. 34:21the lake behind the dam
  819. 34:23and it'll move
  820. 34:25to a free-flowing yeah yep yep yep
  821. 34:31[Music]
  822. 34:36we're
  823. 34:38um we are going to take the three full
  824. 34:40300 feet
  825. 34:42um it's a matter of how how deep we go
  826. 34:45um and and that is it's something we
  827. 34:47have to look at in the in the next in
  828. 34:50the next phases
  829. 34:51hmm
  830. 34:54um yeah I'm gonna think I'm going to
  831. 34:55apple recipe the last question and then
  832. 34:57I'll get through my parts and let uh let
  833. 34:59Ramona um get through the rest of the
  834. 35:01presentation but yeah uh my question is
  835. 35:04uh does the PowerHouse yeah have to be
  836. 35:08removed can it be repurposed for
  837. 35:10something else
  838. 35:13I guess I guess
  839. 35:15I guess we're thinking about
  840. 35:16repurposing I mean what could it be I
  841. 35:19mean could it be donated to the town the
  842. 35:21science center a restaurant a house I
  843. 35:24mean it's got a nice location right by
  844. 35:27the river can it be used for something
  845. 35:29else or does it have to be demolished
  846. 35:31well I think pointed out there are
  847. 35:33contaminants so that would that would
  848. 35:35have to be done with the contaminants
  849. 35:36and then
  850. 35:37you have to be account
  851. 35:39wanted that's a conversation well it's a
  852. 35:41town but ask if they wanted it
  853. 35:43we've had uh we no the town is not we
  854. 35:46could always engage with the town but
  855. 35:48there's also the ACT
  856. 35:53the building looks like it's
  857. 35:55structurally not that bad yeah it has
  858. 35:57some kind of pollutant stuff you have to
  859. 35:59get rid of but that's going to happen in
  860. 36:01a lot of old building for people took
  861. 36:03care of them and did something with them
  862. 36:05and it's kind of historic on site there
  863. 36:08I go by every day because I fight that
  864. 36:11way and it's going to be kind of sad to
  865. 36:14take the building down when it's you're
  866. 36:16it's unnecessary really the developer
  867. 36:19approached the state about buying that
  868. 36:20and turning it into a restaurant and
  869. 36:22because the state owns it it's a
  870. 36:24liability issue with the contaminants
  871. 36:32we are working with the state historic
  872. 36:34preservation office in regards to this
  873. 36:37and I talked to town in Avon and trying
  874. 36:39to figure out as we see we have
  875. 36:40historical photographs okay so I mean
  876. 36:42it's it's a good point it's something
  877. 36:43that we should think about and
  878. 36:45go ahead check no we have a slides to
  879. 36:47discuss this later on yeah yeah
  880. 36:53next so this is the um the to the to the
  881. 36:57question earlier of where uh where where
  882. 37:00is the sediment and
  883. 37:02um damn material to go where most of it
  884. 37:05will be in buried in the Raceway under
  885. 37:08two feet of Earth and then the other
  886. 37:12possible area is to build up the river
  887. 37:14Left Bank to get it to a more natural
  888. 37:17size you know to match the Bank full
  889. 37:20width of what the channel is expected to
  890. 37:22be that will happen regardless of
  891. 37:24whether we do anything or not it's just
  892. 37:26a matter of whether we want to when we
  893. 37:28leave the site we want that River Left
  894. 37:30Bank to to be naturalized or whether it
  895. 37:34happens in 30 years or 50 Years or or so
  896. 37:38it'll happen regardless it's just a
  897. 37:40matter of when
  898. 37:42and that's something that will will
  899. 37:44tease out as we go through the next
  900. 37:45design phase
  901. 37:47um and then and so the next steps so
  902. 37:50this is this is uh what we've done so
  903. 37:52far we're just we're at a concept design
  904. 37:54um it'll to go from there to a final
  905. 37:56design and ultimately construction
  906. 37:59um it'll require a couple additional
  907. 38:01site investigations to get a couple more
  908. 38:03data points
  909. 38:05um in a full historical assessment
  910. 38:07landscape renderings which help
  911. 38:09visualize what this will look like
  912. 38:11um and some additional public Outreach
  913. 38:13and input and and more meetings
  914. 38:15hopefully you all are available in those
  915. 38:18future dates and then determining a
  916. 38:21demolition sequence and uh then all that
  917. 38:24information will go into a engineering
  918. 38:27design 60 and and ultimately a 90 design
  919. 38:30which will then will um work with our
  920. 38:33regulatory team to to submit permits for
  921. 38:37and I think that is it for me so I'm
  922. 38:39going to turn it over to the gym
  923. 38:45next slide yeah next slide
  924. 38:49awesome thank you
  925. 38:52okay well thanks everybody for coming
  926. 38:54tonight so again my name is Jim Turk I
  927. 38:57work with Noah's restoration Center this
  928. 39:00uh the RC is part of the national marine
  929. 39:02fisheries service so I I'm actually uh
  930. 39:05working on behalf of fish and other
  931. 39:08living Marine Resources and that
  932. 39:09includes uh migratory fish like American
  933. 39:13shed and River Herring and American eel
  934. 39:15so that's one of the reasons why I'm
  935. 39:18here and uh and so my role in doing this
  936. 39:21work and I've been doing it for 24 plus
  937. 39:23years with the ERC is relative to Dam
  938. 39:26removals and other types of fish passage
  939. 39:28is to provide technical assistance and
  940. 39:32then also funding so we have grant
  941. 39:34funding uh to uh to actually Advance
  942. 39:37these projects hopefully to completion
  943. 39:39and uh and so in in
  944. 39:422021 the state of Connecticut was
  945. 39:45awarded uh funds from NOAA to work on
  946. 39:48the project so the funds that have been
  947. 39:51allocated to the states so far are for
  948. 39:53the assessment or assisting with the
  949. 39:56assessment and design phase and so
  950. 39:58that's where that money from NOAA comes
  951. 40:00from I've got to keep track of it and
  952. 40:02also provide that technical assistance
  953. 40:04to the state and working with uh with
  954. 40:07Princeton Hydro but um
  955. 40:10I I probably should have called this
  956. 40:12Federal uh statutory compliance because
  957. 40:16I don't really want to necessarily talk
  958. 40:18about regulations I want to talk about
  959. 40:19Federal statutes and
  960. 40:22what's that Supreme Court yeah no I I
  961. 40:26don't want to get in the weeds but I I
  962. 40:28think it's very important that we we
  963. 40:30have this aspect so next slide uh if you
  964. 40:33could
  965. 40:34so there's there's two
  966. 40:35statutes that I just want to cover why
  967. 40:37we're here tonight why we know on behalf
  968. 40:41of Noah we appreciate you being here
  969. 40:43because public input is everything we
  970. 40:46need to know you know what are the
  971. 40:47concerns that people may have with their
  972. 40:49their positive or negative towards a
  973. 40:51project and so with NEPA so NEPA was uh
  974. 40:54passed in
  975. 40:581970 right 70 and so the the value of
  976. 41:01that is to try to make sure that we're
  977. 41:03taking account of public engagement to
  978. 41:06address projects are going to move
  979. 41:08forward or potentially move forward uh
  980. 41:10for any kind of effects on the
  981. 41:12environment whether it's natural
  982. 41:14resources cultural resources
  983. 41:17socioeconomics uh and even now uh you
  984. 41:20know things that relate to climate
  985. 41:22change how climate change may affect the
  986. 41:24project and in turn how a product may
  987. 41:26affect climate change so those are all
  988. 41:28aspects that we need to take into
  989. 41:30account as part of NEPA but what we what
  990. 41:32Noah did in 2015 is we created What's
  991. 41:35called the programmatic environmental
  992. 41:38impact statement and addresses the
  993. 41:40typical type of restoration projects
  994. 41:42that we work on across the country
  995. 41:43there's about 120 of me's all over the
  996. 41:46place across the country working on
  997. 41:48restoration like this and and so that
  998. 41:52programmatic helps us take care of a
  999. 41:55process in a very concise and relatively
  1000. 41:58short-term way and I know you probably
  1001. 41:59think this is a lot of jargon but it's
  1002. 42:01very important that you are aware of why
  1003. 42:04we're doing this and making sure that
  1004. 42:06we're trying to work with the public and
  1005. 42:08so we use that
  1006. 42:10that Peis to help start the process and
  1007. 42:14so before we awarded the money to the
  1008. 42:16state of Connecticut we went through uh
  1009. 42:19what's called an inclusion analysis and
  1010. 42:21we kind of go back to the pis to see
  1011. 42:24what are the typical impacts that you
  1012. 42:25have with Dam removals and Dam removals
  1013. 42:28is one of them in that package and so
  1014. 42:29then we create that assessment and
  1015. 42:32ensure to try to truncate all the
  1016. 42:34process of trying to get the money to
  1017. 42:36the state so you keep it moving but the
  1018. 42:39other part is why why I'm here tonight
  1019. 42:40to make sure I'm listening to you to be
  1020. 42:43the spoke of uh to hear what what people
  1021. 42:45may have for concerns
  1022. 42:48whatever they may be okay so anyways um
  1023. 42:52if the funds and so like I said earlier
  1024. 42:55the funds that Noah has a word to the
  1025. 42:57state go towards assessment and design
  1026. 43:00permitting phase if they are going to
  1027. 43:02apply for more no funds who uh the
  1028. 43:05current uh Federal monies there's a lot
  1029. 43:07of money through bil
  1030. 43:10bipartisan infrastructure law and then
  1031. 43:13the inflation reduction act so more
  1032. 43:16jargon but basically there's a lot of
  1033. 43:18money available right now the state may
  1034. 43:21apply as a proposal to try to secure
  1035. 43:23additional money to implement the
  1036. 43:25project and so that could cover another
  1037. 43:28part of it and so we would anticipate
  1038. 43:30that more NEPA analysis would be done on
  1039. 43:32the pis to make sure that it's falling
  1040. 43:35within the
  1041. 43:37you know the parameters of that uh that
  1042. 43:39document so next slide please
  1043. 43:43the other one is as part of of looking
  1044. 43:46at
  1045. 43:47um of potential uh effects of a project
  1046. 43:50is through the National Historic
  1047. 43:52preservation act and as you might as
  1048. 43:54some people had talked about it earlier
  1049. 43:56you know we're talking about historical
  1050. 43:58resources all these structures are are
  1051. 44:00quite old and uh they're over a century
  1052. 44:03all pretty much and so what we what Noah
  1053. 44:06does under the statutory requirements is
  1054. 44:09to consult with the state historic
  1055. 44:11preservation office as well as any
  1056. 44:13tribal historic preservation offices
  1057. 44:15that may have an interest in in in the
  1058. 44:19site and and its resources there and so
  1059. 44:22um in June uh June of 2022 there was
  1060. 44:26initial project notification form that
  1061. 44:29was submitted to the shippo uh in
  1062. 44:31Connecticut here and uh just to let them
  1063. 44:34know here's the potential project that
  1064. 44:35may occur and so they start to
  1065. 44:37understand that what's out there and and
  1066. 44:40uh and so that that's the initial
  1067. 44:41consult consultation you know that the
  1068. 44:44federal agency that has a responsibility
  1069. 44:47to to uh to coordinate with them and so
  1070. 44:50that happened in June and then in
  1071. 44:51November under section 106 we did a site
  1072. 44:55visit with Kathy the body and some of
  1073. 44:57her staff and she's here tonight from
  1074. 44:58the shipoff if you had any specific
  1075. 45:00questions on this because I'm not a I'm
  1076. 45:03not a historical uh expert by no means
  1077. 45:06I'm a restoration ecologist but I've
  1078. 45:08done about 45 damn removals now and uh
  1079. 45:12and it's the process that stays pretty
  1080. 45:14much the same and so you you follow stay
  1081. 45:16in your lane you do things right
  1082. 45:19and uh and so we did that site visit in
  1083. 45:22November and uh of course we got
  1084. 45:25feedback from Kathy and her staff and uh
  1085. 45:28the next step that we got was trying to
  1086. 45:31get a formalized uh response and uh so
  1087. 45:34what we learned at uh part of this
  1088. 45:36because of it's more or less uh in a
  1089. 45:39historic industrial site is to do things
  1090. 45:42what with a analysis which includes a
  1091. 45:45historic American engineering record or
  1092. 45:48hear documentation and so what that is
  1093. 45:50is uh it includes typically a certain
  1094. 45:53format to describe the site and and
  1095. 45:56there's there's a whole bunch of
  1096. 45:57different information that needs to go
  1097. 45:59into that but that it also includes
  1098. 46:01Graphics so you take measurements of the
  1099. 46:03site and so you create Graphics as part
  1100. 46:06of that documentation and photographs
  1101. 46:08and so these are all put together to
  1102. 46:10basically if a structure is going to be
  1103. 46:13removed you want to you want to have
  1104. 46:14good documentation that well defines
  1105. 46:16what had been there you know so it's all
  1106. 46:18part of the package that you know goes
  1107. 46:21to the record that people can always go
  1108. 46:22back to see what had been there
  1109. 46:25and so um uh and I should say that the
  1110. 46:29although it hasn't been uh really
  1111. 46:32started to much extent there is a
  1112. 46:34historical consultant that's going to
  1113. 46:35work with Prince and hydro to to do all
  1114. 46:38the work the being experts not like me
  1115. 46:41being a restoration ecologist so that's
  1116. 46:44what the next process is for the
  1117. 46:46historical uh concerns and uh and so I
  1118. 46:50just wanted to be aware of that and if
  1119. 46:52you hit the last slide make sure I cover
  1120. 46:54everything yeah so just to summarize the
  1121. 46:57overall approach of course is the
  1122. 46:58minimize adverse effects to the
  1123. 47:01historical resources that are there and
  1124. 47:03uh and that red line that we were
  1125. 47:05looking at before the area of a
  1126. 47:07potential effect that really goes back
  1127. 47:09to historical issues as well so if you
  1128. 47:12take the dam out and the empowerment
  1129. 47:14drops down what hypothetically could
  1130. 47:16happen is you might find Historical
  1131. 47:18resources within the riverbed that no
  1132. 47:20one's aware because you can't see them
  1133. 47:22and it's hard to find them and so that
  1134. 47:24is an area that would be covered as part
  1135. 47:26of that paper and
  1136. 47:29the way the way everything is finalized
  1137. 47:31is an agreement a formalized agreement a
  1138. 47:34memorandum of agreement between the
  1139. 47:36federal agency uh the shippo potentially
  1140. 47:39tippos
  1141. 47:40uh the state probably and any other
  1142. 47:43potential consult interested parties and
  1143. 47:46so that all comes together and it's a
  1144. 47:48signed agreement of how things are going
  1145. 47:51to be carried out and if there are
  1146. 47:53impacts adverse effects there's
  1147. 47:55different ways that mitigation is
  1148. 47:57carried out and that's just an example
  1149. 47:59of a photo of a product I worked on up
  1150. 48:01in New Hampshire but that's like a road
  1151. 48:03signage that told a story about the
  1152. 48:05homestead Dam that we took out back in
  1153. 48:072010 but there's different ways to do
  1154. 48:10this work and not what would be going
  1155. 48:13into amid a memorandum of agreement
  1156. 48:16working with Kathy and other interested
  1157. 48:19parties to come up with a way to to uh
  1158. 48:22show you know to use it as could be
  1159. 48:24public education there's different ways
  1160. 48:27to do it so that I just want to make
  1161. 48:29sure people understand that we're in a
  1162. 48:31nice process or we want to carry out the
  1163. 48:33process in a very discreet way I think
  1164. 48:36that's it for me right
  1165. 48:37yeah well thanks and I can answer other
  1166. 48:40questions after that
  1167. 48:46hey good evening everyone Matt goklowski
  1168. 48:49I'm a supervising Fisheries biologist
  1169. 48:51with the Connecticut deep Fisheries
  1170. 48:52division in the habitat conservation
  1171. 48:55enhancement program and diagonist fish
  1172. 48:57restoration program
  1173. 48:59and today I'm going to be giving you an
  1174. 49:01overview of some of the benefits to fish
  1175. 49:03passage and Fisheries resources that are
  1176. 49:05associated with this potential project
  1177. 49:08next slide
  1178. 49:11so the Farmington River is widely known
  1179. 49:13as one of the best cold water Fisheries
  1180. 49:16resources in the Northeast region a big
  1181. 49:19reason for that is that the river
  1182. 49:21receives a steady release of cold high
  1183. 49:25quality water from the base of the
  1184. 49:26Goodwin Dam and this essentially creates
  1185. 49:29optimal conditions for growth and
  1186. 49:33survival of trout in the river
  1187. 49:36uh the the upper Farmington River is
  1188. 49:40stocked with between 40 and 50 000 trout
  1189. 49:43on an annual basis and it also supports
  1190. 49:46a robust population of of wild brown
  1191. 49:48trout in the river
  1192. 49:50roughly 33 kilometers of the river are
  1193. 49:53designated as trout Management areas and
  1194. 49:56the lower Collinsville Dam Falls within
  1195. 49:59the middle of one of our uh our seasonal
  1196. 50:02trout Management areas
  1197. 50:03next slide
  1198. 50:06so the existing conditions in the area
  1199. 50:09of the lower Collinsville Dam
  1200. 50:11uh the the section of river immediately
  1201. 50:14below the dam is a very popular fishing
  1202. 50:17spot both in the spring and fall
  1203. 50:19primarily for trout
  1204. 50:21we have observed some trout spawning
  1205. 50:24activity in the riffle below the dam
  1206. 50:26but in the area immediately Upstream of
  1207. 50:29the dam we generally consider that
  1208. 50:31relatively low quality habitat for trout
  1209. 50:34and some of our other stream fish
  1210. 50:36species
  1211. 50:38one of the big reasons for that is that
  1212. 50:40when you have water behind a dam it it's
  1213. 50:43not naturally free-flowing it sits there
  1214. 50:45and it warms up in the Sun
  1215. 50:47and you can see on the the graphic on
  1216. 50:51the right side of the street of the
  1217. 50:53screen there we had measured water
  1218. 50:55temperature in the river last year at a
  1219. 50:58number of different locations you'll see
  1220. 51:00that red line in the middle all the
  1221. 51:02locations to the left of that are
  1222. 51:05located Upstream of the the Collinsville
  1223. 51:07dams and the locations to the right of
  1224. 51:09that are Downstream of the Collinsville
  1225. 51:11dams so what we found is
  1226. 51:15the sample sites below the the lower
  1227. 51:17Collinsville Dam water temperature was
  1228. 51:21uh on this particular day in the middle
  1229. 51:23of July it was almost 20 25 degrees
  1230. 51:27Celsius and anytime you have water above
  1231. 51:30about 20 degrees Celsius that starts to
  1232. 51:32get too warm for trout and they move and
  1233. 51:35seek out other areas of the river
  1234. 51:38um
  1235. 51:40the biggest impact of the dam is that it
  1236. 51:42is also a barrier to the Upstream
  1237. 51:45migration of both our resident fish
  1238. 51:47species and our migratory fish species
  1239. 51:50as well so next slide please
  1240. 51:54so we're envisioning some potential
  1241. 51:57post-project conditions to look much
  1242. 52:01better for our resident species and our
  1243. 52:04migratory fish species in the river
  1244. 52:07so if the dam is removed the impounded
  1245. 52:10section the ponded section is going to
  1246. 52:12be converted to a naturally free-flowing
  1247. 52:14stream
  1248. 52:15that's going to restore full aquatic
  1249. 52:17organism Passage through this area
  1250. 52:20and it's really going to improve
  1251. 52:23habitat quality for all life stages of
  1252. 52:25trout and many of our other resonant
  1253. 52:27species in the river
  1254. 52:30uh fish are going to have access to uh
  1255. 52:33higher quality substrates the water is
  1256. 52:36going to be more oxygenated
  1257. 52:39we're anticipating increased macro
  1258. 52:41invertebrate production and we're
  1259. 52:44anticipating that water within the
  1260. 52:46impoundment and the area Downstream from
  1261. 52:48the impoundment is going to be much
  1262. 52:50cooler and better to support some of our
  1263. 52:53cold water species
  1264. 52:54next slide please
  1265. 52:58the real the biggest benefits that we're
  1266. 53:01anticipating from a potential dam
  1267. 53:03removal project here are really the
  1268. 53:06improved uh Upstream passage for the
  1269. 53:10migratory species that we're looking to
  1270. 53:12restore within the river
  1271. 53:14so that we have taught five Target
  1272. 53:16species that we're looking to restore
  1273. 53:18and uh for our diademus fish species
  1274. 53:21that move between freshwater and salt
  1275. 53:23water to complete their life cycles
  1276. 53:25of those four species are known as
  1277. 53:28anatomous fish species these fish spawn
  1278. 53:32in fresh water their juveniles migrate
  1279. 53:35down to the ocean where they grow and
  1280. 53:37live for a few years before they return
  1281. 53:39to freshwater to spawn
  1282. 53:41the five the four Target species that
  1283. 53:44we're looking to restore populations of
  1284. 53:46in the Farmington River are Alewife Blue
  1285. 53:48Back Herring American shad and sea
  1286. 53:51lamprey
  1287. 53:52and it's because of their life cycle
  1288. 53:55it's really critical that we provide
  1289. 53:57opportunities for them to move upstream
  1290. 53:59and um barriers like the lower
  1291. 54:02Collinsville Dam can really impact their
  1292. 54:04ability there's currently no way for
  1293. 54:06these species to move around the dam
  1294. 54:09our fifth Target species is the American
  1295. 54:13eel and it has a catastromous life cycle
  1296. 54:16where it actually spawns in the ocean
  1297. 54:19and juveniles move up uh into fresh
  1298. 54:22waters to live and grow before moving
  1299. 54:24back out to the sea to spawn
  1300. 54:27for them they could actually Ascend the
  1301. 54:30lower Collinsville Dam under certain
  1302. 54:32flow conditions
  1303. 54:34but it's it's definitely an impediment
  1304. 54:37for them and when they're climbing up
  1305. 54:39the dam they're they're vulnerable to
  1306. 54:40predation so removing the dam will also
  1307. 54:43en enhance their Upstream passage as
  1308. 54:45well next slide
  1309. 54:51so the Farmington River Watershed is
  1310. 54:55really the top priority uh Watershed for
  1311. 54:58anadromous fish Restoration in the state
  1312. 55:00of Connecticut the Farmington River is
  1313. 55:03one of the largest rivers in the state
  1314. 55:05and it is the largest tributary of
  1315. 55:08Lincoln County River
  1316. 55:10there are relatively few dams on the
  1317. 55:12river currently and there are no dams on
  1318. 55:15the main stem Connecticut River
  1319. 55:16Downstream of the Confluence so there's
  1320. 55:19a limited number of man-made barriers
  1321. 55:21and within the Watershed there's
  1322. 55:23actually a limited number of of uh
  1323. 55:25natural barriers as well so there is a
  1324. 55:28lot of potential high quality habitat
  1325. 55:30available for these anatomist species to
  1326. 55:32make use of
  1327. 55:35um the river is also a very important
  1328. 55:38and popular recreational area for
  1329. 55:41Anglers paddlers and people that just
  1330. 55:45want to observe wildlife there are
  1331. 55:47actually two federally designated wild
  1332. 55:49and Scenic sections of the river as
  1333. 55:51Ramona mentioned earlier so there's
  1334. 55:54there's a lot of interest and support
  1335. 55:56for ecological restoration on on within
  1336. 56:00the Watershed
  1337. 56:01so next slide please
  1338. 56:04so because of all that that potential
  1339. 56:07within the Watershed the state and many
  1340. 56:10other organizations have invested an
  1341. 56:12incredible amount of resources toward
  1342. 56:14improving fish passage in aquatic
  1343. 56:16connectivity in the in the Watershed so
  1344. 56:19I'm just going to briefly take you
  1345. 56:20through some of the uh the past
  1346. 56:23projects on along the river that have
  1347. 56:25happened in recent years
  1348. 56:27so the the first barrier on the
  1349. 56:30Farmington River is the rainbow Dam it's
  1350. 56:33located about nine miles Upstream from
  1351. 56:35the Confluence with the Connecticut
  1352. 56:36River
  1353. 56:38it is a privately owned Dam and it is
  1354. 56:41not subject to the Fert regulatory
  1355. 56:43process it's operated as a hydropower
  1356. 56:47Dam but what that means is
  1357. 56:50the state and other organizations like
  1358. 56:53uh other federal agencies like NOAA and
  1359. 56:56Fish and Wildlife service really have a
  1360. 56:57limited ability to
  1361. 57:00um
  1362. 57:02through the regulatory process require
  1363. 57:04any fish passage improvements at the dam
  1364. 57:07that being said the state of Connecticut
  1365. 57:10does own and operate in Upstream a fish
  1366. 57:13way
  1367. 57:15as well as a downstream bypass structure
  1368. 57:18for Downstream Passage
  1369. 57:21both of these structures were designed
  1370. 57:23for the passage of Atlantic salmon and
  1371. 57:25they don't perform as well for the
  1372. 57:28Target species that we're looking to
  1373. 57:29recover right now
  1374. 57:31but our upper management within deep is
  1375. 57:34currently engaging in in some high-level
  1376. 57:37conversations on ways of potentially
  1377. 57:40reconnecting uh
  1378. 57:43reconnecting the stream and enhancing
  1379. 57:46fish passage at this location so next
  1380. 57:48slide
  1381. 57:50the next barrier on the river
  1382. 57:54was the spoonbill Dam located a few
  1383. 57:56miles Upstream from the rainville the
  1384. 57:59rainbow Dam
  1385. 58:00so this project uh there was a project
  1386. 58:03who fully removed the remnants of this
  1387. 58:05Dam in 2012 and now this section of the
  1388. 58:08river is fully restored and and acting
  1389. 58:11like a natural River next slide
  1390. 58:15the next barrier on the River is located
  1391. 58:18at River mile 31 and that is the
  1392. 58:20Winchell Smith dam in the town of
  1393. 58:22Farmington
  1394. 58:23this is an Old Timber crib structure it
  1395. 58:27is partially breached and we consider
  1396. 58:29this a partial barrier some of our our
  1397. 58:32migratory fish species are able to pass
  1398. 58:34this in under certain flow conditions
  1399. 58:37but ideally we'd like to see the stand
  1400. 58:40fully removed one of our partner
  1401. 58:42organizations the Farmington River
  1402. 58:44Watershed Association is sponsoring a
  1403. 58:46project to remove this Dam and we're
  1404. 58:49anticipating that this could be removed
  1405. 58:50as soon as next summer
  1406. 58:53next slide
  1407. 58:55the lower Collinsville Dam which is the
  1408. 58:57subject of this presentation uh I'm not
  1409. 59:01going to go into too much detail here
  1410. 59:02but I'll mention again that this is the
  1411. 59:06only structure that um
  1412. 59:09on the river that does not currently
  1413. 59:12have a means for an address fish to pass
  1414. 59:15it so it is is currently at the end of
  1415. 59:17the road for those fish right now
  1416. 59:19next slide
  1417. 59:22the upper Collinsville Dam which is
  1418. 59:24located about one mile Upstream from the
  1419. 59:26lower Collinsville Dam recently was
  1420. 59:29granted a license through the Federal
  1421. 59:31Energy Regulatory Commission ferc and as
  1422. 59:36part of that license the operator of the
  1423. 59:38dam was required to install and operate
  1424. 59:41state-of-the-art fish passage facilities
  1425. 59:43at the dam so these consist of a denial
  1426. 59:46fish ladder for Upstream passage of most
  1427. 59:49of our species a eel eel pass which is
  1428. 59:53specifically designed for Upstream
  1429. 59:55passage of juvenile eels
  1430. 59:57as well as a downstream bypass surface
  1431. 1:00:01bypass structure and uh uh a barrier
  1432. 1:00:06screen which will allow for safe
  1433. 1:00:08Downstream passage of all of our species
  1434. 1:00:11as well as a zigzag eel pass which is
  1435. 1:00:14the first of its kind in North America
  1436. 1:00:16which is specifically designed to pass
  1437. 1:00:18adult American eel over the dam
  1438. 1:00:22so this this is uh just a mile Upstream
  1439. 1:00:26from the lower Collinsville Dam and it
  1440. 1:00:28it is currently accessible to resident
  1441. 1:00:30fish species but if we are able to
  1442. 1:00:33remove the lower Collinsville Dam that
  1443. 1:00:35will immediately open
  1444. 1:00:36essentially the the bulk of the
  1445. 1:00:39Watershed that we're targeting for
  1446. 1:00:40restoration next slide
  1447. 1:00:43so the long-term outlook for fish
  1448. 1:00:46passage in the Farmington River
  1449. 1:00:48Watershed is actually uh very bright
  1450. 1:00:52so with the existing conditions and
  1451. 1:00:54infrastructure present on the river
  1452. 1:00:56anatomous fish species have access to up
  1453. 1:01:00to about 52 miles of riverine habitat
  1454. 1:01:04uh with the removal of the lower
  1455. 1:01:06Collinsville Dam that would open up an
  1456. 1:01:09additional roughly 18 miles of main stem
  1457. 1:01:12riverine habitat and up to 40 additional
  1458. 1:01:16miles of tributary habitat for these
  1459. 1:01:18species
  1460. 1:01:19and we anticipate that uh this could
  1461. 1:01:23lead to the Watershed producing
  1462. 1:01:25regionally significant
  1463. 1:01:27um
  1464. 1:01:28spawning runs of American Shad about 45
  1465. 1:01:32000 fish returning on an annual basis as
  1466. 1:01:36well as almost 300 000 uh both of
  1467. 1:01:41Alewife and blue back Herring returning
  1468. 1:01:43to the river on an annual basis
  1469. 1:01:45so with that I will turn it back to
  1470. 1:01:47Ramona
  1471. 1:01:51so that was just kind of a quick
  1472. 1:01:53overview a quick quick uh the potential
  1473. 1:01:56removal I know we are we just finished a
  1474. 1:01:59conceptual design
  1475. 1:02:01um I just want to say nothing is set in
  1476. 1:02:02stone that's why we're trying to reach
  1477. 1:02:03out to get everybody's questions and
  1478. 1:02:06concerns and if I mean we're going to
  1479. 1:02:08open up for questions but if sometime
  1480. 1:02:10after you have some question that pops
  1481. 1:02:12in your mind you can always email me and
  1482. 1:02:14I will and there's my contact
  1483. 1:02:15information so I'm going to open up for
  1484. 1:02:18any more questions that somebody has I'm
  1485. 1:02:20just going to keep a car in the eye on
  1486. 1:02:22the clock because we don't want to get
  1487. 1:02:24kicked out we're going to get kicked out
  1488. 1:02:25okay
  1489. 1:02:27yeah I'd say two questions
  1490. 1:02:29um one what do you estimate the cost of
  1491. 1:02:33the removal of the dam will be
  1492. 1:02:35so I don't know if I ever heard the
  1493. 1:02:37estimated cost
  1494. 1:02:38um
  1495. 1:02:39I think we've checked I think we had we
  1496. 1:02:41had uh we reached out to Princeton
  1497. 1:02:42Heights with estimated cost just for
  1498. 1:02:44construction not including the design
  1499. 1:02:47and the conceptual work the overall
  1500. 1:02:49project how much is it going to cost
  1501. 1:02:51um I would say maybe Chuck do you want
  1502. 1:02:54to think maybe uh I think it was
  1503. 1:02:56estimated the construction would be
  1504. 1:02:57about 5 million but that's just
  1505. 1:02:59construction we I don't we have not
  1506. 1:03:01included the cost because I mean what
  1507. 1:03:04that would mean that's like a hiring a
  1508. 1:03:06contractor to at the actual physical
  1509. 1:03:07removal of the dam but we are not even
  1510. 1:03:10at that phase we're still in the
  1511. 1:03:12conceptual design so that does not
  1512. 1:03:14including the design and then there'd be
  1513. 1:03:16an engineering Administration so we
  1514. 1:03:19haven't really worked out the whole full
  1515. 1:03:21cost but we're estimating the
  1516. 1:03:22construction with the construction
  1517. 1:03:23contractor just the physical removal to
  1518. 1:03:26be about five million dollars
  1519. 1:03:28but I'm gonna say inflation is happening
  1520. 1:03:32yeah I mean it's hard for me to really
  1521. 1:03:34understand what that number means
  1522. 1:03:36correct because if you haven't included
  1523. 1:03:38all the Professional Services I'm sure
  1524. 1:03:41Princeton uh
  1525. 1:03:44um you know they they need to get paid
  1526. 1:03:46as well and and I just had one other
  1527. 1:03:49question from Matt I don't know
  1528. 1:03:51um
  1529. 1:03:52appreciating that you open up the lower
  1530. 1:03:54Dam there's a dam another mile up
  1531. 1:03:58um and I understand is from your
  1532. 1:04:00presentation of their fish passage
  1533. 1:04:03so that doesn't exist with the lower
  1534. 1:04:05down
  1535. 1:04:07um
  1536. 1:04:08would the empowerment temperature
  1537. 1:04:12beyond the the Hydro Dam what I'll call
  1538. 1:04:15the the second the upper Collinsville
  1539. 1:04:18Dam yeah thank you the upper
  1540. 1:04:20Collinsville Dam
  1541. 1:04:21um how would that temperature
  1542. 1:04:23potentially affect the species that
  1543. 1:04:26you're thinking will be able to migrate
  1544. 1:04:28northward
  1545. 1:04:30so for specifically for the migratory
  1546. 1:04:33fish species they're they're typically
  1547. 1:04:34moving up water especially the anatomous
  1548. 1:04:37species
  1549. 1:04:38um they're moving during the the spring
  1550. 1:04:41essentially so between April and June
  1551. 1:04:44they're going to be moving up River it's
  1552. 1:04:46generally not that warm in the river at
  1553. 1:04:49that time of the year so
  1554. 1:04:51um well when would it be warmer
  1555. 1:04:54let's see if
  1556. 1:04:56June is is summer here that it's hot
  1557. 1:05:01your slides seemed to imply because this
  1558. 1:05:04is going to have some significant
  1559. 1:05:05measurable positive impact between
  1560. 1:05:08the temperature of the water above the
  1561. 1:05:10dam the temperature of the waterfall
  1562. 1:05:11over days in fact there's another Dam
  1563. 1:05:13with a large empowerment area it isn't
  1564. 1:05:15going to be anything so what sense is
  1565. 1:05:17there any meaningful way to
  1566. 1:05:19to even presume you're going to see that
  1567. 1:05:21kind of temperature change
  1568. 1:05:24well it's difficult to predict exactly
  1569. 1:05:26what the temperature difference is going
  1570. 1:05:28to be but we're lessening the amount of
  1571. 1:05:30empowerment is going to have some impact
  1572. 1:05:32on
  1573. 1:05:41there's a huge area here in the sun I
  1574. 1:05:44mean there is no question that that's
  1575. 1:05:45wide open in receiving a lot of direct
  1576. 1:05:48sunlight so the area my point was that
  1577. 1:05:51the area on the on the above the upper
  1578. 1:05:54yeah
  1579. 1:05:55same thing but you have half the amount
  1580. 1:05:58of water that's hot now why is there
  1581. 1:06:00halfway there
  1582. 1:06:01coming from that area coming down it's
  1583. 1:06:05not flowing up that that's coming up the
  1584. 1:06:07hot water that's coming to the second
  1585. 1:06:09area that now sits and heats up even
  1586. 1:06:11more after then once you remove that Dam
  1587. 1:06:14that area is not there so the water
  1588. 1:06:16comes over the first day and flows down
  1589. 1:06:18the river there's not a second place
  1590. 1:06:19where it picks up yeah okay but if
  1591. 1:06:23there's if I could just I guess that
  1592. 1:06:25would be a question for me to know like
  1593. 1:06:28what you really think the temperature
  1594. 1:06:30North of the upper dam is going to be
  1595. 1:06:33because I don't know what importance
  1596. 1:06:36that temperature and that sensitivity
  1597. 1:06:37has to fish but I would think May to
  1598. 1:06:41June like that
  1599. 1:06:42it doesn't get much hotter than I mean
  1600. 1:06:44maybe in August
  1601. 1:06:50yeah okay all right so I think I mean
  1602. 1:06:55that's a good question for Matt and then
  1603. 1:06:57maybe Matt would be able to talk to you
  1604. 1:06:58a little bit more off stream because I
  1605. 1:07:00think there's a lot more questions
  1606. 1:07:04anticipate removal and how would it be
  1607. 1:07:06removed so if in a perfect world and
  1608. 1:07:10everybody says this is a great idea and
  1609. 1:07:11nobody has to do questions and the
  1610. 1:07:12permits go through and there's no delays
  1611. 1:07:15um it would be probably been on Earth
  1612. 1:07:19you know sometime in 2024 but that's
  1613. 1:07:22once again I would say nothing is set in
  1614. 1:07:24stone we we are flexible with the
  1615. 1:07:27movement with when this is going to
  1616. 1:07:28happen
  1617. 1:07:29will they use explosives too that we
  1618. 1:07:32that's a part of the where we're working
  1619. 1:07:34with with the conceptual design if that
  1620. 1:07:36that if that's an object if that's an
  1621. 1:07:38option then we have to go through that
  1622. 1:07:40to see if that's even feasible but if it
  1623. 1:07:42could be just a mechanical removal that
  1624. 1:07:44so I mean I think that was an option
  1625. 1:07:47that was put out there but that still
  1626. 1:07:48needs to be greatly looked into if there
  1627. 1:07:51if there is a possibility than that
  1628. 1:07:52because I want to bring popcorn you
  1629. 1:07:59first I'll say I'm totally against this
  1630. 1:08:03to take and invest five million dollars
  1631. 1:08:05to gain 2 000 feet of river
  1632. 1:08:10disrupt 18
  1633. 1:08:12000 yards of sediment that's going to go
  1634. 1:08:15Downstream which that's an enormous
  1635. 1:08:18amount of silt
  1636. 1:08:20now you're going to disrupt possible
  1637. 1:08:23contaminants from the Collins company
  1638. 1:08:25because you're going to drop
  1639. 1:08:26from what I'm hearing 12 feet of water
  1640. 1:08:30when you probably could put a fish
  1641. 1:08:33ladder up alongside
  1642. 1:08:35the Raceway as he's calling it for a
  1643. 1:08:39million and a half
  1644. 1:08:42that's just input
  1645. 1:08:45thank you
  1646. 1:08:47oh wait no sorry over here I just wanted
  1647. 1:08:50to say thank you I thought the
  1648. 1:08:51presentation was very
  1649. 1:08:54always
  1650. 1:08:55one question maybe a comment I was
  1651. 1:08:58wondering if somebody could speak to the
  1652. 1:09:00permanent path just kind of a general
  1653. 1:09:03idea that
  1654. 1:09:06specifically I'm wondering if you are
  1655. 1:09:09the best any involvement with this and
  1656. 1:09:12then that's kind of the question the
  1657. 1:09:14comment is I think that you know there
  1658. 1:09:17needs to be maybe a level set in terms
  1659. 1:09:19of what you can expect for potential
  1660. 1:09:22timing because I expect the permitting
  1661. 1:09:25process is going to very long very
  1662. 1:09:27involved and then the other piece of
  1663. 1:09:30that is that just gets you the design
  1664. 1:09:32you have to go shop around funding at
  1665. 1:09:34that point so I would have to say it's
  1666. 1:09:37probably
  1667. 1:09:41um so
  1668. 1:09:42um I I'm gonna give the permanent
  1669. 1:09:44question to um Chuck Lee who's with the
  1670. 1:09:47assistant director of their their damn
  1671. 1:09:50safety programs which include Dam safety
  1672. 1:09:52and he can could touch on the permitting
  1673. 1:09:54aspect but we are engaging it won't it
  1674. 1:09:58won't take five years for that the
  1675. 1:10:00permitting process and with the group it
  1676. 1:10:02will take a little bit but we will
  1677. 1:10:04engage with the Army Corps we are
  1678. 1:10:06already starting to engage
  1679. 1:10:08um and we are work as I think Jim
  1680. 1:10:10mentioned you know there is a lot of
  1681. 1:10:12money with the bil the bipartisan
  1682. 1:10:14infrastructure law legislation so we are
  1683. 1:10:17looking into
  1684. 1:10:19actual Federal funding for this as well
  1685. 1:10:21so I'm going to hand it over to Chuck to
  1686. 1:10:23talk a little bit about the permitting
  1687. 1:10:24process so the project will require
  1688. 1:10:27um
  1689. 1:10:30within the DM safety permit there's also
  1690. 1:10:32a lot of other permits that are embedded
  1691. 1:10:34in that permit where like a warranty dam
  1692. 1:10:37removal or project it might be they
  1693. 1:10:40might have to individually get those
  1694. 1:10:41permits but flood management
  1695. 1:10:43certifications embedded in the in the
  1696. 1:10:45dam safety permit other aspects like
  1697. 1:10:48diversion permanent would be included so
  1698. 1:10:50it'll require a Connecticut DEP Dam
  1699. 1:10:52safety permit also some level Army Corps
  1700. 1:10:55permit I'm not really sure right now but
  1701. 1:10:57the Army Corps will be involved because
  1702. 1:10:59there's no fill really going on here
  1703. 1:11:01it'll probably be easier to get this
  1704. 1:11:03permit than it might be for other
  1705. 1:11:04projects
  1706. 1:11:06and the National Park Service
  1707. 1:11:08right I don't as natural park service
  1708. 1:11:10going to be permitting it they're going
  1709. 1:11:12to have to review
  1710. 1:11:14right that would be right
  1711. 1:11:17right go ahead
  1712. 1:11:20um
  1713. 1:11:27wildlife
  1714. 1:11:29there and my neighbors will tell you
  1715. 1:11:32that I swim in that income and every day
  1716. 1:11:34June July August September I'm in there
  1717. 1:11:37constantly I know it very well I've
  1718. 1:11:39lived there for over 20 years and and
  1719. 1:11:42this is is many things I I think if I
  1720. 1:11:45had lived in 1912 and seen them blowing
  1721. 1:11:48up the damage building that thing I
  1722. 1:11:49would have hated it but I didn't I live
  1723. 1:11:51in it now I live where it is now and it
  1724. 1:11:53is a unique ecosystem
  1725. 1:11:55it is embedded between two dams
  1726. 1:11:58and
  1727. 1:11:59I spend every day looking at the the the
  1728. 1:12:02birds and the animals
  1729. 1:12:06that live in that impoundment that we
  1730. 1:12:10have created this and you know I hear
  1731. 1:12:12about blasting and I think about the
  1732. 1:12:14nesting pair of eagles that lives right
  1733. 1:12:16there and I'm wondering what we're doing
  1734. 1:12:17for them I I hear about reducing the
  1735. 1:12:21level of water and I think about the
  1736. 1:12:23nesting pair of ospreads and what are we
  1737. 1:12:25going to do for them I know that there
  1738. 1:12:28are at least two active Beaver lodges
  1739. 1:12:31that need that death that need that
  1740. 1:12:33water there and what are we going to do
  1741. 1:12:35for them and so you know I love hearing
  1742. 1:12:38about we're gonna you know it's going to
  1743. 1:12:39grow it's going to be beautiful we're
  1744. 1:12:40going to get you know a gorgeous array
  1745. 1:12:42of beautiful flowers and plants there
  1746. 1:12:43but we have a board just array there now
  1747. 1:12:46we have created an ecosystem the animals
  1748. 1:12:49didn't ask us to damn all of this
  1749. 1:12:51but we did and we created this area for
  1750. 1:12:55them
  1751. 1:12:55and when I walk I've documented over 55
  1752. 1:12:59species of birds in this area
  1753. 1:13:03and and so I I worry about what we're
  1754. 1:13:05going to do so that we can get and I
  1755. 1:13:08I'm not excited about the eels but I
  1756. 1:13:10understand the fish I understand the
  1757. 1:13:12fish have to move
  1758. 1:13:14but I also wonder what we're doing
  1759. 1:13:16ecologically to this space that we
  1760. 1:13:19created the animals are now populating
  1761. 1:13:22and now living it and what's going to
  1762. 1:13:24happen to them when we say
  1763. 1:13:26in 2024 2025 so sorry you don't have a
  1764. 1:13:29lake anymore you have a river and where
  1765. 1:13:32are they going to go and and where are
  1766. 1:13:34they going to fish you know I spent a
  1767. 1:13:36lovely night until until dust listening
  1768. 1:13:40to all the eagles Mom and Dad training
  1769. 1:13:43this year's lunch
  1770. 1:13:44how to fish in this empowerment not down
  1771. 1:13:49below the dam and not up above in this
  1772. 1:13:53space
  1773. 1:13:54and it is it is a beautiful space that
  1774. 1:13:57we have created and I think we need to
  1775. 1:13:59be thoughtful I'm glad we have a lot of
  1776. 1:14:01money that we can spend on this it's
  1777. 1:14:03great to have funds but I think we
  1778. 1:14:06really need to be thoughtful about what
  1779. 1:14:08has been created because it has value it
  1780. 1:14:11has value to all of us it is a beautiful
  1781. 1:14:13magical and unique spot that our
  1782. 1:14:17forebearers created back in 99. and and
  1783. 1:14:20so I think we need to be really
  1784. 1:14:22thoughtful about that
  1785. 1:14:24I I do think you bring up a very good
  1786. 1:14:26point and I think that is something that
  1787. 1:14:28that you should also take in
  1788. 1:14:29consideration I like to say that you
  1789. 1:14:31know
  1790. 1:14:32these state dance we're not an island we
  1791. 1:14:34we are a whole department of
  1792. 1:14:36environmental and energy protection we
  1793. 1:14:38do talk within and we will reach out to
  1794. 1:14:40other sections in the wildlife section
  1795. 1:14:42within the department you know to make
  1796. 1:14:44sure that we are going to be protective
  1797. 1:14:51is
  1798. 1:14:57public aspect of it is used a lot during
  1799. 1:15:01the summer there's kayaking there a
  1800. 1:15:03river you can't you can kayak down but
  1801. 1:15:06you can't tag back up people Park along
  1802. 1:15:09the river and
  1803. 1:15:11kayaking small kids there's fishing
  1804. 1:15:13there's dog bathing there's swimming
  1805. 1:15:17um
  1806. 1:15:18fish
  1807. 1:15:19the idea that it's going to go away and
  1808. 1:15:21turn into something it looks
  1809. 1:15:23some wild is as well as seen it because
  1810. 1:15:25the lower portion going from the from
  1811. 1:15:27the lower down down into Unionville I
  1812. 1:15:30mean I walk away the trail as well and
  1813. 1:15:31this is a whole different View and it's
  1814. 1:15:34beautiful
  1815. 1:15:35but it's kind of um you really can't do
  1816. 1:15:38much of it as a human being other fish
  1817. 1:15:41is I guess very good but um it's fast
  1818. 1:15:45running water and it's just different
  1819. 1:15:48because you guys did a good presentation
  1820. 1:15:50on it especially
  1821. 1:15:53a fish aspect of it
  1822. 1:15:55the question from a few people is if the
  1823. 1:15:58fish have been going up there in 75
  1824. 1:16:00years what makes you
  1825. 1:16:02and that's possibly a silly
  1826. 1:16:05yeah
  1827. 1:16:12yeah so I mean
  1828. 1:16:15when they started with the the upper
  1829. 1:16:18down to put the power in and they were
  1830. 1:16:20talking about the uh the fish ladders
  1831. 1:16:22and all
  1832. 1:16:24um I understand I think that's a
  1833. 1:16:25requirement nowadays
  1834. 1:16:27in some places to put fish ladders in
  1835. 1:16:30and I can see where that maybe brings
  1836. 1:16:32some health up
  1837. 1:16:34species but losing the the weight that's
  1838. 1:16:38on I'm calling to the lake is being
  1839. 1:16:40impounded area that where you see
  1840. 1:16:43I think the little bears foxes
  1841. 1:16:48Beaver porcupines
  1842. 1:16:51measles weasels I mean there's a lot of
  1843. 1:16:55wildlife down there there's been
  1844. 1:16:56wondering about and it's pretty
  1845. 1:16:58interesting to watch I mean
  1846. 1:17:00the the larger Birds they're
  1847. 1:17:04it's just
  1848. 1:17:06I think we're sometimes in too much of a
  1849. 1:17:08hurricane
  1850. 1:17:10to put it all in in documentation and
  1851. 1:17:13put a steel sign up one and say this is
  1852. 1:17:16where this was and so we have it I mean
  1853. 1:17:22just destroyed
  1854. 1:17:25Tennessee
  1855. 1:17:26thank you
  1856. 1:17:29um
  1857. 1:17:31sorry go ahead hi um so I completely
  1858. 1:17:36understand
  1859. 1:17:37um your perspective and and I know there
  1860. 1:17:39are concerns about the cost
  1861. 1:17:42um but what I have to say is right now
  1862. 1:17:46the money is here to do it and
  1863. 1:17:50understanding that rainbow dam is still
  1864. 1:17:52there but 10 years from now we can find
  1865. 1:17:55ourselves in a situation where people
  1866. 1:17:57dance coming out out and for some reason
  1867. 1:18:00we had not removed lower Collinsville we
  1868. 1:18:03still have that one barrier when we have
  1869. 1:18:05no fish passage and number two think
  1870. 1:18:09about another scenario where you know
  1871. 1:18:11there was a horrible tragedy you know
  1872. 1:18:14several years ago
  1873. 1:18:15and the state was sued and what if it
  1874. 1:18:18happens again and the state is sued for
  1875. 1:18:21five million dollars
  1876. 1:18:22and we can say then
  1877. 1:18:24we had an opportunity to take that damn
  1878. 1:18:26down and not only is there their loss of
  1879. 1:18:28life but now taxpayers are out of
  1880. 1:18:31several million dollars due to or more
  1881. 1:18:35to to another lawsuit so you know when
  1882. 1:18:39we we're thinking to hear it now but you
  1883. 1:18:42know going forward
  1884. 1:18:44um we have an opportunity and change is
  1885. 1:18:48very hard but the river is going to be
  1886. 1:18:52better for it and and I think we'll be
  1887. 1:18:56better for it
  1888. 1:18:57in the future and in the future
  1889. 1:18:59Generations
  1890. 1:19:01would you know
  1891. 1:19:04if the rails the trails in that area
  1892. 1:19:06would be shut down during the removal
  1893. 1:19:08process
  1894. 1:19:10so it would be a temporary closure and
  1895. 1:19:13we would I think we're that's still up
  1896. 1:19:15for discussion and I think we have to
  1897. 1:19:16try to have conversations so it would be
  1898. 1:19:18temporary and ultimately we try to do it
  1899. 1:19:21when it would not be like a highly
  1900. 1:19:24populated time so maybe try more towards
  1901. 1:19:27you know in the colder Seasons but you
  1902. 1:19:30know that is a very big consideration
  1903. 1:19:32there about the Rails to Trails there
  1904. 1:19:34and we want to make sure that and we're
  1905. 1:19:35trying to make sure we have notice and
  1906. 1:19:37access but it would not be a it would be
  1907. 1:19:40a temporary closure
  1908. 1:19:43Steve
  1909. 1:19:46um I'd like to make a couple of points
  1910. 1:19:48one
  1911. 1:19:50is about the uniqueness of the
  1912. 1:19:52impoundment I think what makes it
  1913. 1:19:54special are the people who live there
  1914. 1:19:57and are sentimentally attached to it and
  1915. 1:19:59that's totally understandable
  1916. 1:20:01but
  1917. 1:20:03um the state of Connecticut has over 4
  1918. 1:20:06000 dams in it which makes us probably
  1919. 1:20:08the most densely damned state in the
  1920. 1:20:10nation and there's nothing ecologically
  1921. 1:20:15unique about that empowerment in fact
  1922. 1:20:17impounded waters are more common in the
  1923. 1:20:20state of Connecticut than free-flowing
  1924. 1:20:22waters are
  1925. 1:20:24and a lot of people and you know we've
  1926. 1:20:28done a lot of dam removals in the state
  1927. 1:20:30of Connecticut this is not the first
  1928. 1:20:31time and we've got a lot of experiences
  1929. 1:20:33uh before and after and there's always
  1930. 1:20:38concern that we're going to destroy
  1931. 1:20:39nature and and that you know we're going
  1932. 1:20:42to do this horrible thing for fish and
  1933. 1:20:44wildlife especially Wildlife but in fact
  1934. 1:20:47we don't destroy nature we convert it so
  1935. 1:20:50yeah there may be
  1936. 1:20:52fewer Mallards but there's going to be
  1937. 1:20:55more great blue herons there's going to
  1938. 1:20:58be less Sunfish and there's going to be
  1939. 1:20:59more brook trout
  1940. 1:21:01um the Eagles and the Ospreys are not
  1941. 1:21:03going to care they're they're going to
  1942. 1:21:05do their business because they have huge
  1943. 1:21:07home ranges so I think it's important
  1944. 1:21:10to recognize that there will be changes
  1945. 1:21:13but there will not be wholesale
  1946. 1:21:15destruction
  1947. 1:21:16I also
  1948. 1:21:18um
  1949. 1:21:19until uh just now nobody's mentioned the
  1950. 1:21:22public safety aspect of it those
  1951. 1:21:25drownings those tragic groundings likely
  1952. 1:21:27were not the first there there have been
  1953. 1:21:30drownings at that Dam throughout
  1954. 1:21:32um and as long as that Dam with its OG
  1955. 1:21:35shaped Spillway which creates that that
  1956. 1:21:39sweeper hydraulic you go by there at
  1957. 1:21:42certain flows and there's basketballs
  1958. 1:21:44and and beach balls and rubber rafts
  1959. 1:21:47right up against the dam and you're
  1960. 1:21:48saying why don't they flow Downstream
  1961. 1:21:50it's because the Hydraulics keep them
  1962. 1:21:51there and they keep swimmers there too
  1963. 1:21:53so as long as that Spillway is there
  1964. 1:21:55we're going to have more drownings and
  1965. 1:21:57it's one of the considerations when we
  1966. 1:21:59remove the spoonbill Dam there is
  1967. 1:22:01drownings at swoonville when we got rid
  1968. 1:22:04of spoonville in there haven't been
  1969. 1:22:05drowning so I think that's that's
  1970. 1:22:08another that's another uh thing to keep
  1971. 1:22:11in mind on this but uh just for the
  1972. 1:22:13record I I think this is a great project
  1973. 1:22:15and I supported so we kind of got a wrap
  1974. 1:22:19up something I have one more question
  1975. 1:22:20and then I know a please email me and we
  1976. 1:22:23can get to them but we got it because
  1977. 1:22:24the library's gonna be closing I think
  1978. 1:22:26did you have a question a quick Columbia
  1979. 1:22:28do this quick but you you opened by
  1980. 1:22:31saying that there's 20 11 or 2012
  1981. 1:22:34economic study feasibility not feasible
  1982. 1:22:37to do electric Generations now that's 12
  1983. 1:22:39years old correct and life in the world
  1984. 1:22:42of uh energy generation has changed a
  1985. 1:22:45lot in 12 years and it's still changing
  1986. 1:22:48has anybody looked at that it's actually
  1987. 1:22:50updated the results yes study to reflect
  1988. 1:22:53real yes and hydro who developed the
  1989. 1:22:56upper right upper Dam they looked at it
  1990. 1:22:59and said no we're not touching that we
  1991. 1:23:02lose money so they they passed on it
  1992. 1:23:04just Brazil
  1993. 1:23:09um so I want to once again thank
  1994. 1:23:10everybody for coming out uh we really
  1995. 1:23:13appreciate everybody coming and
  1996. 1:23:14participating like I said we're going to
  1997. 1:23:16have more public Outreach and meetings
  1998. 1:23:19to get everybody's thoughts and
  1999. 1:23:20questions and once again please reach
  2000. 1:23:22out to me ramona.good ct.gov if you have
  2001. 1:23:25any more questions you would like to
  2002. 1:23:26send so thank you everybody
  2003. 1:23:29[Applause]
  2004. 1:23:35[Music]
  2005. 1:23:46thank you
  2006. 1:23:49[Music]
  2007. 1:23:53foreign
  2008. 1:23:57[Music]
  2009. 1:24:17[Music]
  2010. 1:24:27today I have a very special guest Dr
  2011. 1:24:30Andrew Lim hello and welcome to another
  2012. 1:24:32episode of the veterans Corner my name
  2013. 1:24:33is Chuck wooden decision for ourselves
  2014. 1:24:36for this week
  2015. 1:24:38if we want to be made well hi welcome to
  2016. 1:24:41the crack of dawn it's Dawn Lombardi I'm
  2017. 1:24:43starting the painting it's going to be
  2018. 1:24:45the clips with some water love it
  2019. 1:24:49he took me on the sets of Lost in Space
  2020. 1:24:53Batman everybody has a story what's
  2021. 1:24:57yours until next time
  2022. 1:25:01[Music]
  2023. 1:25:08foreign
  2024. 1:25:10[Music]

About this transcript

This page contains the full transcript of DEEP Public Meeting - Collins Company Lower Dam Removal 9-28-23 by Nutmeg TV, generated from the public captions YouTube serves with the video. The transcript has 12,996 words across 2,024 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, caption language selection, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.