  1. 0:00c-span 2.
  2. 0:07next a hearing on the columbia space
  3. 0:09shuttle then ken starr and floyd abrams
  4. 0:12on the challenge to campaign finance
  5. 0:14laws
  6. 0:14after that mexican president vicente fox
  7. 0:17last week the shuttle columbia accident
  8. 0:19investigation board
  9. 0:21released its final report nasa
  10. 0:23administrator sean o'keefe
  11. 0:25and the head of that investigative board
  12. 0:26harold gaiman testified on capitol hill
  13. 0:29this is just under two and a half hours
  14. 0:40last week the columbia accident
  15. 0:42investigation board released its report
  16. 0:44on the causes of the space shuttle
  17. 0:47accident that occurred seven months ago
  18. 0:49and today the committee will begin a
  19. 0:50thorough examination of its conclusions
  20. 0:54the board's final report is one of the
  21. 0:55most comprehensive ever produced
  22. 0:57concerning the management and operations
  23. 0:59at nasa
  24. 1:01it must serve as a wake-up call to nasa
  25. 1:03and the nation
  26. 1:05that we have for too long put off hard
  27. 1:07choices and force the space program to
  28. 1:09limp along without adequate guidance or
  29. 1:11funding
  30. 1:12as stated in the report quote unless the
  31. 1:15technical
  32. 1:16organizational and cultural
  33. 1:18recommendations made in this report are
  34. 1:20implemented
  35. 1:21little will have been accomplished to
  36. 1:23lessen the chance
  37. 1:24that another accident will follow
  38. 1:26unquote that's a very chilling
  39. 1:29and powerful statement and i hope all
  40. 1:31members of congress
  41. 1:33will pay close attention to that
  42. 1:35statement if nothing else in this report
  43. 1:38the report reminds us that we are still
  44. 1:40in the developmental stage of space
  45. 1:42transportation and that space is an
  46. 1:44unforgiving environment
  47. 1:46which challenges our technical expertise
  48. 1:49it also raises a number of important
  49. 1:51issues that will have to
  50. 1:52be considered as we plan for the future
  51. 1:54of the space program
  52. 1:56most importantly we will have to figure
  53. 1:58out where we want the space program to
  54. 2:00go
  55. 2:01and what we expect to get out of it then
  56. 2:04we will have to ensure that adequate and
  57. 2:05on earmarked funds
  58. 2:07are provided for these missions it is
  59. 2:10imperative that we eliminate wasteful
  60. 2:12spending and make efficient use of those
  61. 2:13resources we commit to space exploration
  62. 2:17the board worked tirelessly to identify
  63. 2:19and clarify the causes of this accident
  64. 2:21i'm deeply grateful to its members for
  65. 2:23their dedication
  66. 2:25although the technical causes the
  67. 2:26accident have been suspected for some
  68. 2:28time
  69. 2:29the board's findings concerning the role
  70. 2:31that nasa's organizational structure and
  71. 2:33culture
  72. 2:34played in this tragedy are as troubling
  73. 2:37as they are valuable
  74. 2:39as the board reported quote complex
  75. 2:42systems
  76. 2:43almost always fail in complex complex
  77. 2:46ways unquote
  78. 2:48the many factors that contributed to the
  79. 2:50accident largely demonstrate how far
  80. 2:52nasa has regressed
  81. 2:54its incomplete and invalid impact
  82. 2:56analysis
  83. 2:57its rejection to seek satellite images
  84. 2:59of the damaged shuttle
  85. 3:01its reliance on past successes as a
  86. 3:03substitute
  87. 3:04for sound engineering practices its
  88. 3:07organizational barriers
  89. 3:09that prevented effective communication
  90. 3:11of critical information
  91. 3:13and stifled professional differences of
  92. 3:15opinion
  93. 3:16and its lack of integrated management
  94. 3:18across program
  95. 3:19elements the report further describes
  96. 3:23nasa's culture as including
  97. 3:25quote flawed decision-making
  98. 3:28self-deception
  99. 3:30introversion and diminished curiosity
  100. 3:33about the world
  101. 3:33outside we'll want to hear from
  102. 3:36administrator o'keefe
  103. 3:38about precisely how and when
  104. 3:41this culture can be changed i welcome
  105. 3:45administrator o'keefe and admiral gaiman
  106. 3:47and look forward to hearing from them
  107. 3:48on the investigation board's findings
  108. 3:50and recommendations in nasa's plan to
  109. 3:52return the space shuttle program
  110. 3:55to flight i'd also like to comment i
  111. 3:57thank
  112. 3:58admiral gaiman and his board members
  113. 4:00again for their outstanding work
  114. 4:02i also think it's appropriate to note
  115. 4:04that
  116. 4:05that mr o'keefe and his staff were
  117. 4:08completely
  118. 4:09cooperative and helpful in the board's
  119. 4:11investigation
  120. 4:12that's not always true in the past but i
  121. 4:15think they
  122. 4:16they deserve credit for being helpful
  123. 4:19even though
  124. 4:20sometimes it was obviously painful
  125. 4:23i'd like to uh turn to my friend of many
  126. 4:26years and
  127. 4:28ranking member of the committee senator
  128. 4:30hollings who
  129. 4:31as we all know made an announcement that
  130. 4:33he would not seek re-election
  131. 4:36i know that senator hollings until the
  132. 4:38last moment is here will continue
  133. 4:40to pursue with bigger passion and always
  134. 4:43non-controversial
  135. 4:45issues that have interested him and
  136. 4:49i must say to my friend he's not gone
  137. 4:51but i
  138. 4:52and all members of this committee will
  139. 4:53miss him
  140. 4:55because of his long and outstanding and
  141. 4:57courageous service on this committee and
  142. 4:59as a member of the united states senate
  143. 5:01senator hollings i thank our
  144. 5:04distinguished chairman and my good
  145. 5:06friend
  146. 5:07john mccain when i left town
  147. 5:11in the 1st of august
  148. 5:14i was a bum i'd been serving
  149. 5:17almost well over 50 years in some public
  150. 5:20office
  151. 5:21and as long as you continue to serve
  152. 5:23your bum
  153. 5:25but as soon as i said i was going to get
  154. 5:26out of the way i became a statesman
  155. 5:30you ought to see the crap that i had put
  156. 5:33out i mean
  157. 5:34you never seen such stuff i mean i i've
  158. 5:37invented everything i've thought of
  159. 5:39everything and everything else of that
  160. 5:40kind
  161. 5:41but uh it has been a distinct pleasure
  162. 5:45and seven times to the united states
  163. 5:48senators enough and i'm
  164. 5:50delighted to have an additional year
  165. 5:52here to see if we can straighten out a
  166. 5:53few things
  167. 5:55for one uh i commend admiral gaiman
  168. 5:58in your committee uh for example i was
  169. 6:02only reading last night
  170. 6:04old unsafe and costly
  171. 6:07the london economist why it's time to
  172. 6:10scuttle the shuttle
  173. 6:12and that's exactly what you recommend
  174. 6:15that the
  175. 6:16shuttle be scuttled however
  176. 6:19i'm sort of intrigued with the finding
  177. 6:22of a culture
  178. 6:25as a navy board of inquiry as an admiral
  179. 6:30you would immediately find
  180. 6:32responsibility
  181. 6:34and whoever was captain of that ship
  182. 6:36would be cash aired
  183. 6:39i don't find that in the report the
  184. 6:41fixing
  185. 6:42of responsibility that intrigues me
  186. 6:47uh if you were the coach of a football
  187. 6:50team they'd buy up the contract
  188. 6:52i haven't lost seven members of the team
  189. 6:56and and let me get right to the point i
  190. 7:00think this committee
  191. 7:02and the whole blooming setup is
  192. 7:05part of the culture i've been on here as
  193. 7:08a distinguished
  194. 7:09chairman just commented for years since
  195. 7:11we've had a space committee
  196. 7:14never have i heard anything about being
  197. 7:16unsafe
  198. 7:17i'll never forget when the challenger uh
  199. 7:20went down
  200. 7:22uh i talked to him out there at martin
  201. 7:24thai call
  202. 7:26if i remember the name it was an allen
  203. 7:28mcdonald
  204. 7:30and he said we told them at the cape it
  205. 7:33was unsafe
  206. 7:35with those old rings particularly the
  207. 7:37cold around there and they were taken
  208. 7:40too great a risk and he said there we
  209. 7:44all were great
  210. 7:45all gathered together in the hearing
  211. 7:48room there at martinsville called up
  212. 7:50there in iowa
  213. 7:51and uh when the challenger blasted off
  214. 7:55jimmy said there she goes and henry said
  215. 7:58like a piece of cake
  216. 8:00and then all of a sudden she blew and
  217. 8:02everyone
  218. 8:04in the room knew why
  219. 8:07i said mr mcdonald would you come and
  220. 8:10tell the committee that
  221. 8:12he said i'd be glad to they headed him
  222. 8:14off and he never testified
  223. 8:18now we thought after the rogers
  224. 8:20committee had
  225. 8:21gotten into it the commission that
  226. 8:23they'd cleaned it up
  227. 8:26and i don't find it's
  228. 8:29of course we you didn't find it's been
  229. 8:31cleaned up on anything else like that
  230. 8:34and we had came with an
  231. 8:37independent safety office but the
  232. 8:40independent safety office
  233. 8:42within uh nasa itself has not worked
  234. 8:46we've lost
  235. 8:47seven astronauts so rather than part of
  236. 8:51the culture that you get up here on the
  237. 8:53hill oh blue
  238. 8:54we're going to get them we're going to
  239. 8:55get that but we're going to be back up
  240. 8:56in space
  241. 8:58we're not going to get up there until we
  242. 9:00get a decent shuttle
  243. 9:02and it's certified safe by others than
  244. 9:05in nasa
  245. 9:06in my opinion i would hope that we
  246. 9:09had learned the lesson here because we
  247. 9:12the ones put the pressure on
  248. 9:15mr o'keefe i know we all had worked with
  249. 9:17him on the appropriations committee and
  250. 9:20when he got appointed that booming space
  251. 9:23station was
  252. 9:24uh or is i think about 40
  253. 9:28billion or 20 billion uh that's right
  254. 9:31that's about 20 billion over budget
  255. 9:33and about only 40 complete so when we
  256. 9:37had the head of the
  257. 9:38office of management and budget go over
  258. 9:40there we were all concerned about money
  259. 9:43we weren't concerned about safety so we
  260. 9:45we part of the culture right up here on
  261. 9:47this
  262. 9:48committee and and rather than praising
  263. 9:50each other how sourly
  264. 9:52the and it has been a very sorry you all
  265. 9:55have really done
  266. 9:56a way better job than i thought uh was
  267. 9:59going to
  268. 10:00uh happen and get done uh you all have
  269. 10:03really worked hard and
  270. 10:05you've got a very comprehensive report
  271. 10:08except the actual fixing of the
  272. 10:10responsibility
  273. 10:12thank you mr chairman thank you senator
  274. 10:14hollings and
  275. 10:16obviously i would ask my colleagues to
  276. 10:18make their comments as briefly
  277. 10:20as possible since we would like to hear
  278. 10:22from the witnesses senator hutchison
  279. 10:25thank you senator mccain mr chairman uh
  280. 10:28first i do want to to commend
  281. 10:31the report the uh open investigation
  282. 10:35that was done
  283. 10:36uh i thank you admiral gaiman for doing
  284. 10:38a great job and i thank you
  285. 10:40administrator o'keefe for letting him do
  286. 10:42a great job
  287. 10:43that says a lot and it was very
  288. 10:45different from the challenger experience
  289. 10:48and uh so we appreciate that so now we
  290. 10:51have
  291. 10:51a blueprint uh of where to go
  292. 10:54uh one of the most important things in
  293. 10:56your report concludes
  294. 10:58that the present shuttle is not
  295. 11:00inherently unsafe
  296. 11:02but it does call for a massive
  297. 11:04recertification process to ensure flight
  298. 11:06safety
  299. 11:07i will look to administrator o'keeffe
  300. 11:09for his
  301. 11:10commitment to the project of
  302. 11:13recertifying
  303. 11:14shuttles before they go back in the air
  304. 11:17the report is a devastating
  305. 11:19attack on nasa's procedure and lines of
  306. 11:22communication
  307. 11:23i hope that the administrator regards
  308. 11:26this report as a blueprint for change
  309. 11:28and i hope that it is acknowledged that
  310. 11:30there could never again be business as
  311. 11:32usual
  312. 11:33at nasa you cannot have your most
  313. 11:36innovative research your most
  314. 11:38technologically advanced
  315. 11:40challenge done with a bureaucratic
  316. 11:42mentality
  317. 11:43this doesn't mean you open the treasury
  318. 11:45but it means you lock your vision
  319. 11:47on a few very big goals and you do them
  320. 11:51right faster better cheaper should be
  321. 11:54thrown
  322. 11:54in the wastebasket when senator nelson
  323. 11:57and i
  324. 11:58particularly along with the whole
  325. 11:59committee asked
  326. 12:01questions of previous administrators are
  327. 12:04we sacrificing safety
  328. 12:07we always got the answer absolutely not
  329. 12:09safety is the first priority
  330. 12:12now we need to make sure that we have
  331. 12:15the vision
  332. 12:16the scientific background and the total
  333. 12:19change in the bureaucracy at nasa from
  334. 12:22the very top to the very bottom
  335. 12:25in line with the recommendations of the
  336. 12:27report
  337. 12:28thank you thank you mr chairman senator
  338. 12:30lautenberg
  339. 12:32thanks very much mr chairman i i will
  340. 12:35be brief and i ask consent that my full
  341. 12:38statement be included in the record
  342. 12:41i would just like to make uh a couple of
  343. 12:44quick points uh and uh
  344. 12:47my my hats off to admiral gaiman i knew
  345. 12:50mr o'keefe
  346. 12:51for the very tough task that you took on
  347. 12:54and
  348. 12:54and the outcome that is described in
  349. 12:57your report i think is
  350. 12:58understandable and will have an effect
  351. 13:01on how we think about things in the
  352. 13:02future and i i would
  353. 13:05i hope that we will learn enough
  354. 13:08directly about the safety requirement
  355. 13:10so that something as terrible has
  356. 13:12happened
  357. 13:13uh with in this in the columbia
  358. 13:16tragedy will never happen again but i
  359. 13:18would go to something of
  360. 13:20principle and uh make a note of the fact
  361. 13:23that
  362. 13:24the privatization program uh that we see
  363. 13:27in government
  364. 13:27almost began with nasa and when we see
  365. 13:30that
  366. 13:31that we have some eighteen hundred
  367. 13:33people i believe the number is
  368. 13:35uh who are overseeing private
  369. 13:38uh contractors in the multiple thousands
  370. 13:42whether or not
  371. 13:43there is enough ability enough
  372. 13:46structure to make sure that they're
  373. 13:48doing what they have to do and
  374. 13:50and i'll close with this when on page
  375. 13:53109 of your report uh admiral heyman
  376. 13:56uh the major annual savings resulting
  377. 13:58from this space flight
  378. 14:00operations contract which in 1996 were
  379. 14:02touted to be some 500 million to a
  380. 14:04billion a year
  381. 14:05by the early 2000s have not materialized
  382. 14:08and i just highlight that because it
  383. 14:12throughout that paragraph it talks to
  384. 14:15the lack of success
  385. 14:16and achieving the cost efficiencies and
  386. 14:20what is it that and permitted
  387. 14:23the costs to be overrun and still
  388. 14:27this terrible thing to take place and i
  389. 14:30hope mr chairman that we'll find out
  390. 14:32about the relationship of
  391. 14:33the private side of this of the the uh
  392. 14:37force and uh what impact it had and i
  393. 14:40thank you very much and
  394. 14:41congratulate you again for the excellent
  395. 14:43work you've done
  396. 14:44senator sununu thank you mr chairman
  397. 14:47i i simply want to thank um admiral
  398. 14:50gaiman and administrator o'keefe
  399. 14:52for their work and uh and reiterate
  400. 14:56chairman mccain's emphasis on the level
  401. 14:59of cooperation that was provided
  402. 15:01the service of the members of the board
  403. 15:03i can't imagine
  404. 15:05an emotionally or or physically more
  405. 15:07difficult
  406. 15:09task than the one that we gave to you
  407. 15:12and we owe a great deal of thanks of
  408. 15:15course to the board members but also to
  409. 15:16the staff the staff at nasa
  410. 15:18and the staff on the board that
  411. 15:20performed a lot of the more difficult
  412. 15:22tasks
  413. 15:23and probably spent at least as much time
  414. 15:25as the board members themselves so we're
  415. 15:26very grateful for your service
  416. 15:28and very appreciative of the work
  417. 15:31senator wyden thank you mr chairman i
  418. 15:34think
  419. 15:34you mr chairman senator hollings have
  420. 15:37both
  421. 15:38put your hands on the central question
  422. 15:40and that's
  423. 15:41looking again at nasa's mission and
  424. 15:44my view is that you cannot resolve the
  425. 15:47issue about nasa's basic mission
  426. 15:50without looking carefully and fresh
  427. 15:53and in a fresh way at the direction of
  428. 15:55the manned space program
  429. 15:57and towards that end mr chairman and
  430. 16:00colleagues i'd like to
  431. 16:01make a modest proposal this morning i
  432. 16:04believe that within
  433. 16:0590 days or at most six months
  434. 16:09nasa should prepare and furnish this
  435. 16:12committee
  436. 16:13a cost-benefit analysis on the manned
  437. 16:16space
  438. 16:17program but i would like to learn and
  439. 16:19what i think would be helpful to all of
  440. 16:21us in the senate
  441. 16:22is to learn more precisely what can
  442. 16:26be accomplished with manned space flight
  443. 16:29and at what price
  444. 16:30and what cannot once this information
  445. 16:33would be made available to the committee
  446. 16:36then we're in a position
  447. 16:38i think for the first time in a long
  448. 16:40time to look carefully
  449. 16:42at how manned space flight fits in to
  450. 16:45nasa's future
  451. 16:47and what can be accomplished with
  452. 16:49unmanned
  453. 16:50space flight that would also achieve the
  454. 16:53scientific discoveries that have been
  455. 16:56envisaged
  456. 16:57for the agency for some time there are
  457. 16:59other issues that i'm going to want to
  458. 17:01explore but i intend to ask
  459. 17:03the administrator about whether he would
  460. 17:06prepare a cost-benefit
  461. 17:07analysis quickly for the senate
  462. 17:11on the manned space flight program the
  463. 17:13other areas that i want to explore
  464. 17:16particularly how this time we would
  465. 17:19ensure
  466. 17:20compliance with the admiral's fine
  467. 17:22recommendations
  468. 17:24i think if you look historically at this
  469. 17:26issue
  470. 17:27after the last tragedy many of the same
  471. 17:30recommendations were made that admiral
  472. 17:32gaiman
  473. 17:33is making now and clearly many of them
  474. 17:36were not
  475. 17:36followed up on i know that the
  476. 17:38administrator
  477. 17:40sean o'keefe feels strongly about this
  478. 17:42as well and i intend to ask some
  479. 17:44questions about how
  480. 17:46it's going to be different this time and
  481. 17:48the recommendations
  482. 17:50will be followed up on but i thank you
  483. 17:52mr chairman senator hollings for
  484. 17:53convening this hearing
  485. 17:55i think the country wanted us to do this
  486. 17:57quickly and you all have
  487. 17:59have done that and i think senator burns
  488. 18:02thank you mr chairman and i'll just
  489. 18:04submit my
  490. 18:05um
  491. 18:08my um my statement for the record i just
  492. 18:11like to um
  493. 18:12that objection just offer a small
  494. 18:15com comment i i like the chairman
  495. 18:18appreciate the work that
  496. 18:20the director has done and this and this
  497. 18:22board has done
  498. 18:24it took a a great deal of uh
  499. 18:27of courage to release the port that you
  500. 18:29did it needed released
  501. 18:32and it took a look at the inside of us
  502. 18:34and we're going to have to re-examine
  503. 18:36just exactly what we found in there
  504. 18:40it's me i i think we now have to
  505. 18:42redirect our
  506. 18:43our our focus now on the vision and the
  507. 18:46r d
  508. 18:46and and that goes along with nasa we
  509. 18:49know that going into space will always
  510. 18:51be
  511. 18:51risky at best and um
  512. 18:55and so that work must go on i think we
  513. 18:58knew we will now
  514. 18:58look at different areas of of uh
  515. 19:02a more moderate way to enter space and
  516. 19:05to move cargo i think we'll take another
  517. 19:07look now at reusables and unmanned
  518. 19:10uh i think in our probes uh our unmanned
  519. 19:13probes into the
  520. 19:15further out in space is will be a very
  521. 19:17important part of this nation
  522. 19:20and so we have a lot of work ahead of us
  523. 19:23but again i want to congratulate you and
  524. 19:26and senator hollings
  525. 19:29it may just seem like a year to you
  526. 19:34but we'll miss you thank you mr chairman
  527. 19:38senator nelson mr chairman i want to
  528. 19:41thank you for calling this hearing today
  529. 19:45uh thank you for your leadership
  530. 19:48in the oversight role that is
  531. 19:52uh by this committee as we proceed and
  532. 19:56thank to both of you gentlemen
  533. 19:59for uh the extraordinary leadership that
  534. 20:02you have offered
  535. 20:04uh admiral gaiman i particularly want to
  536. 20:06commend you
  537. 20:07who i've worked with over the course of
  538. 20:10the past several months
  539. 20:12having read a lot of your interviews
  540. 20:15having talked to your very professional
  541. 20:17staff
  542. 20:19talk to the members of your board i
  543. 20:22i think you have done an excellent work
  544. 20:25product
  545. 20:28i expected what you came out
  546. 20:32and talked about the decision-making
  547. 20:35being influenced by the culture and we
  548. 20:38need
  549. 20:39very much to attend to that
  550. 20:43what i did not expect but was
  551. 20:46pleasantly surprised in your report that
  552. 20:48you addressed head on
  553. 20:50the question of the funding and how
  554. 20:53over time i can draw my own conclusions
  555. 20:58as i have railed in this committee on
  556. 21:01several occasions that you can't do
  557. 21:03space flight on the cheap
  558. 21:06that there are just too many things in a
  559. 21:09risky
  560. 21:11business that have got to be attended to
  561. 21:13and particularly
  562. 21:15when safety is overlooked because money
  563. 21:17is siphoned off
  564. 21:19of the space shuttle program to put it
  565. 21:21onto something else
  566. 21:23which has occurred over the past decade
  567. 21:26and so thank you for bringing up that
  568. 21:29aspect
  569. 21:30and mr chairman i will close by saying
  570. 21:33again thank you for the oversight
  571. 21:36hearings and i think
  572. 21:37this is going to be extremely important
  573. 21:40that in our oversight capacity
  574. 21:44that although we can't lead the space
  575. 21:48program
  576. 21:48that has to go all the way to the top to
  577. 21:50the white house
  578. 21:53we can certainly let as senator
  579. 21:55hutchinson has already said
  580. 21:57our expressions of concern
  581. 22:01be known of what
  582. 22:04is adequately funding the program so
  583. 22:07that
  584. 22:07safety is not sacrificed
  585. 22:10like it has been we went through this
  586. 22:12drill
  587. 22:1317 years ago and safety was going to be
  588. 22:17number one
  589. 22:18and it was for about two or three years
  590. 22:21and then the hard reality set in
  591. 22:24of siphoning the money off of relegating
  592. 22:27the safety considerations because of the
  593. 22:30day-to-day
  594. 22:31financial decisions they were being
  595. 22:34relegated to the back seat so thank you
  596. 22:36mr chairman
  597. 22:37thank you senator brownback thank you mr
  598. 22:39chairman
  599. 22:41on february 1 this country certainly
  600. 22:43suffered in the world suffered a
  601. 22:44terrible and tragic loss on the shuttle
  602. 22:46columbian or crude
  603. 22:48the seven astronauts that were explorers
  604. 22:50and they wished to serve their countries
  605. 22:51and they did just that
  606. 22:53well certainly saddened by the events
  607. 22:54that took place in that faithful day
  608. 22:56fateful day however we're true to this
  609. 22:59country's resolve we've been determined
  610. 23:00to find and correct a cause and move
  611. 23:02forward and see what that is what this
  612. 23:04hearing is about today
  613. 23:06i believe it is imperative that america
  614. 23:08remains at the forefront of space
  615. 23:10exploration and discovery and it's our
  616. 23:12job here in congress to take this report
  617. 23:14move forward expeditiously and getting
  618. 23:17america back into say
  619. 23:18in space safely aboard an american
  620. 23:21vehicle
  621. 23:22i'm committed to authoring and working
  622. 23:24on reauthorizing a bill for nasa during
  623. 23:27this congress
  624. 23:28and use this report to provide some of
  625. 23:30the guidelines for that bill
  626. 23:32also pleased to see that the board
  627. 23:34recognizes the importance of a vision
  628. 23:36for america's future in manned space
  629. 23:38exploration
  630. 23:39and i believe it's time for us to step
  631. 23:42back and to really
  632. 23:43review that and to establish that vision
  633. 23:46and i'm hopeful we can see created a
  634. 23:48presidential commission on the future of
  635. 23:50space exploration
  636. 23:52to establish a common vision for space
  637. 23:55exploration by america
  638. 23:56i've held several subcommittee hearings
  639. 23:58over the last few months
  640. 24:00with not only nasa but other federal
  641. 24:02officials but also
  642. 24:03the private sector companies and
  643. 24:04entrepreneurs in an effort to ascertain
  644. 24:07what america's vision for future space
  645. 24:09space exploration should be
  646. 24:12in all these hearings one thing has
  647. 24:14stood clear americans continue to
  648. 24:16support human space flight and
  649. 24:18exploration
  650. 24:19we cannot allow ourselves to give up and
  651. 24:21turn our backs on exploring space and
  652. 24:23the universe because we have suffered
  653. 24:25loss of life
  654. 24:26those are the risk we acknowledge and
  655. 24:28accept for the opportunity to improve
  656. 24:30the quality of life here on earth and
  657. 24:32beyond
  658. 24:34we are tasked today with moving forward
  659. 24:35to ensure america's return to flight
  660. 24:37i'm anxious to hear what nasa's response
  661. 24:40is to the board's report
  662. 24:42but i'm also very interested in where
  663. 24:43they plan to go from here with
  664. 24:45america's vision and space exploration
  665. 24:48thank you mr chairman for holding the
  666. 24:49hearing
  667. 24:50senator bro thank you mr chairman and uh
  668. 24:55let me join with all of our colleagues
  669. 24:58on the committee who i think have a
  670. 25:02universal agreement on the quality of
  671. 25:05the work that was done
  672. 25:06admiral after this great tragedy and the
  673. 25:09cooperation
  674. 25:10mr o'keefe that nasa had the role that
  675. 25:14nasa played in working out this very
  676. 25:17detailed
  677. 25:18investigation of a very tragic set of
  678. 25:20circumstances
  679. 25:22and it indeed is very tragic and is very
  680. 25:24very high profile
  681. 25:25if you think that every year we lose
  682. 25:27about 40 000 american lives on accidents
  683. 25:30every
  684. 25:31year on our nation's highways this is an
  685. 25:34accident involving seven real american
  686. 25:37heroes
  687. 25:38but it really speaks to the essence of
  688. 25:40what america is all about
  689. 25:42in the sense the quest for conquering
  690. 25:43outer space is really something that
  691. 25:47affects every american very deeply when
  692. 25:49you see something so visible
  693. 25:51as a shuttle tragedy that occurred
  694. 25:55so i have a number of questions about
  695. 25:57the recommendations and the culture that
  696. 25:59admiral you talked about and how we
  697. 26:01changed that but
  698. 26:03let me just say now that the report i
  699. 26:05think is
  700. 26:06well done and the cooperation i think
  701. 26:09that was exhibited
  702. 26:10is also to be commended now thank you
  703. 26:12both
  704. 26:13senator snow thank you mr chairman and
  705. 26:16thank you for holding
  706. 26:17uh this hearing so promptly and
  707. 26:19responsibly
  708. 26:20and i certainly want to welcome admiral
  709. 26:22gaiman and administrator o'keefe here
  710. 26:25uh this morning this report as
  711. 26:27everybody's indicated is about moving
  712. 26:29forward but the question is how we do so
  713. 26:31in a manner that honors
  714. 26:32the memories of those brave astronauts
  715. 26:35who lost their lives and to prevent a
  716. 26:36reoccurrence of this
  717. 26:38tragedy from occurring in the future
  718. 26:41this report does i think represent a
  719. 26:44giant leap
  720. 26:45forward and understanding that which
  721. 26:46needs to be fixed
  722. 26:48i think the question is the change that
  723. 26:50needs to occur
  724. 26:51in the implementation of that change and
  725. 26:54admiral gaiman i want to congratulate
  726. 26:55you
  727. 26:56and the board for your extraordinary
  728. 26:58efforts
  729. 26:59that you invested in developing this
  730. 27:02report
  731. 27:03but also i think reaching beyond
  732. 27:06and not just ascertaining the last thing
  733. 27:09that
  734. 27:10occurred but also understanding the
  735. 27:12whole system and patterns of failures
  736. 27:15in shortcomings i think that that is
  737. 27:17essential
  738. 27:18for understanding the complete picture
  739. 27:21in order to address uh the inequities
  740. 27:24and also
  741. 27:25the failures overall i would also say
  742. 27:28that we know
  743. 27:30that this is as you indicated admiral
  744. 27:32gaiman
  745. 27:33complex systems always fail in complex
  746. 27:36ways
  747. 27:37so obviously the solution is going to be
  748. 27:39equally complicated
  749. 27:40i think what becomes abundantly clear in
  750. 27:43this whole process
  751. 27:45is that the execution and the
  752. 27:47perpetuation
  753. 27:49of comprehensive changes must occur
  754. 27:53in order for the manned space flight
  755. 27:55program to continue
  756. 27:56in order to save lives in the future
  757. 28:00and i think we were all shocked by the
  758. 28:03revelations of the shortcomings of
  759. 28:06miscommunications obviously
  760. 28:10the bureaucratic misfirings and
  761. 28:13i think as a result we have to know
  762. 28:17how and what must be done but more
  763. 28:19importantly
  764. 28:20is establishing a perpetuity of
  765. 28:22vigilance and making sure that these
  766. 28:24things are
  767. 28:25implemented for the long haul in the
  768. 28:27longevity that is going to require
  769. 28:30we cannot allow our outrage or concern
  770. 28:33to atrophy
  771. 28:35you know we have seen past reports
  772. 28:38many of which were overlooked and that
  773. 28:41cannot occur
  774. 28:42again in this instance and so when the
  775. 28:44spotlight is
  776. 28:46off i would hope uh that we will be able
  777. 28:50to be assured
  778. 28:52that what has been recommended in this
  779. 28:54report is going to go forward
  780. 28:56it's not a question just depending on
  781. 28:58previous successes however tenuous to
  782. 29:00predict future success
  783. 29:02the question is how do we create a
  784. 29:04permanent management structure
  785. 29:06that will enable nasa to succeed in the
  786. 29:09future with this program
  787. 29:11and i know we have a lot of remarkable
  788. 29:12people at nasa and i know with your
  789. 29:14leadership
  790. 29:15administrator o'keefe and your
  791. 29:17extraordinary work at the board admiral
  792. 29:19gaiman
  793. 29:19that it is possible and that when we
  794. 29:22look back at this time
  795. 29:23of tragic loss that we can view it as a
  796. 29:26turning point in the history of
  797. 29:28america's manned space flight program
  798. 29:30thank you mr chairman senator noah
  799. 29:34thank you very much mr chairman i wish
  800. 29:36to commend administrator o'keefe
  801. 29:39and admiral gaiman for this careful
  802. 29:42candid and courageous report thank you
  803. 29:45very much
  804. 29:46i ask that the complete statement is
  805. 29:48made part of the record without
  806. 29:49objection
  807. 29:50welcome to the witnesses we'll begin
  808. 29:52with you administrator o'keeffe thank
  809. 29:54you for appearing today thank you mr
  810. 29:57chairman
  811. 29:57uh i have a statement i'd like to submit
  812. 30:02for the record if you would and i'll
  813. 30:03briefly summarize
  814. 30:04and if you pull a microphone a little
  815. 30:06closer
  816. 30:08is that resonating a little better
  817. 30:12over our 45 years as a agency
  818. 30:15when nasa was founded in 1958
  819. 30:18we have found in the course of that
  820. 30:20history
  821. 30:22that our time has been defined by the
  822. 30:25great successes
  823. 30:26and the great failures in each of these
  824. 30:29defining moments
  825. 30:31our strength and resolve as
  826. 30:32professionals has been tested to be sure
  827. 30:36and this is one of the seminal moments
  828. 30:38in our history
  829. 30:40it is defined by a failure
  830. 30:44on february the 1st we pledge to the
  831. 30:46families
  832. 30:48of the columbia 7 that we would find the
  833. 30:51problem
  834. 30:53fix it and return exploration objectives
  835. 30:56that their loved ones dedicated their
  836. 30:57lives to
  837. 31:00the columbia accident investigation
  838. 31:01board's report completes the first of
  839. 31:03these commitments
  840. 31:05and we are indebted to admiral gaiman
  841. 31:08and his board members
  842. 31:09for their exceptional public servants
  843. 31:11and extraordinary diligence
  844. 31:13in this difficult task we wanted
  845. 31:16an unvarnished answer and we got it
  846. 31:22as we begin to fulfill the second
  847. 31:24commitment to the families to fix the
  848. 31:26problem
  849. 31:28our first step critical first step
  850. 31:32is to accept the findings comply with
  851. 31:36the recommendations
  852. 31:37and embrace this report there is no
  853. 31:40equivocation on that pledge
  854. 31:43this report as many of you observed is a
  855. 31:46blueprint
  856. 31:48it's a road map to achieve that second
  857. 31:50objective
  858. 31:52now in the course of the proceedings of
  859. 31:54this investigation the board has given
  860. 31:55us an extraordinary head start
  861. 31:58by their candor their openness and the
  862. 32:00release of findings and recommendations
  863. 32:02during the course of the investigation
  864. 32:04this has all been conducted in a very
  865. 32:06open setting
  866. 32:09and they have telegraphed all along the
  867. 32:11way in the course of their public
  868. 32:12hearings commentary
  869. 32:14exactly what their findings were as they
  870. 32:17found them
  871. 32:17and moved forward and we've been
  872. 32:19listening
  873. 32:22so we've gotten a start thanks to their
  874. 32:24good work and
  875. 32:25the manner in which they conducted it in
  876. 32:27developing an implementation plan
  877. 32:31and the implementation plan will be
  878. 32:32released here later this week
  879. 32:36with the intent to be updated all the
  880. 32:39time on the findings and recommendations
  881. 32:41and you'll see that in this
  882. 32:42initial effort at it
  883. 32:45and divided into two primary categories
  884. 32:48the 29 recommendations
  885. 32:50of the columbia accent investigation
  886. 32:52board
  887. 32:53and then a second approach which is
  888. 32:55raising the bar to a standard higher
  889. 32:57than that
  890. 32:58and we will include in that category
  891. 33:00everything and anything
  892. 33:02that's going to improve this process as
  893. 33:05well as the
  894. 33:06the capabilities and the hardware itself
  895. 33:10as we work through these recommendations
  896. 33:13we have to choose
  897. 33:14options to implement them very wisely in
  898. 33:17order to be fully compliant with those
  899. 33:19recommendations and we've got to
  900. 33:22continually improve and upgrade the plan
  901. 33:24itself to incorporate
  902. 33:25every aspect we find along the way in
  903. 33:28our implementation effort and any
  904. 33:31other observation from wherever it may
  905. 33:33come
  906. 33:34that needs to be addressed as we work
  907. 33:36our way through that
  908. 33:37in our commitment to fix the problem
  909. 33:41the report covers hardware failures and
  910. 33:44human failures
  911. 33:46and how our culture needs to change to
  912. 33:48mitigate against succumbing
  913. 33:50to failures of both kind
  914. 33:55we must go forward and resolve to follow
  915. 33:58this blueprint and do it
  916. 33:59in a way that is our very best effort to
  917. 34:01make this a stronger organization
  918. 34:03there is no question about that it will
  919. 34:06require
  920. 34:07all of us in the agency not just the
  921. 34:09human space flight effort
  922. 34:10not any one center not any one program
  923. 34:13all of us at nasa to recognize this is
  924. 34:16an institutional set of findings
  925. 34:18that has application to everything we do
  926. 34:21and that's a profound set of
  927. 34:22recommendations we wanted that
  928. 34:24unvarnished assessment
  929. 34:26and we got it
  930. 34:29it's a very different nasa today than it
  931. 34:32was on february 1st
  932. 34:34our lives are forever changed by this
  933. 34:37tragic event
  934. 34:39but not nearly to the extent that the
  935. 34:42lives of the columbia families have been
  936. 34:43changed
  937. 34:44for the rest of their time
  938. 34:49in taking inspiration from their
  939. 34:50approach we must be as resolute
  940. 34:52and courageous in our efforts as they
  941. 34:54have been in working through this
  942. 34:55tragedy
  943. 34:57and committing ourselves to accepting
  944. 35:00these right
  945. 35:00these findings complying with these
  946. 35:02recommendations and embracing this
  947. 35:04report
  948. 35:05we know that how we respond in the days
  949. 35:07weeks and months ahead
  950. 35:09will matter as much as what we decide to
  951. 35:11do
  952. 35:12and whether it be a lasting change that
  953. 35:15will withstand
  954. 35:16the years from now i think has been
  955. 35:18observed by so many here as well
  956. 35:23we must also resolve that definition
  957. 35:26and be definitive in our acceptance of
  958. 35:28our failures and
  959. 35:29following through on our commitment to
  960. 35:31the families to fix the problem
  961. 35:33and return to the exploration objectives
  962. 35:35their loved ones dedicated their lives
  963. 35:37to
  964. 35:38and in that effort we know we've got a
  965. 35:40lot of work ahead of us
  966. 35:42and we've accepted that thank you mr
  967. 35:44chairman
  968. 35:46thank you very much admiral gaiman and
  969. 35:48uh i want to
  970. 35:50extend not only our appreciation to you
  971. 35:51but all members of your commission for
  972. 35:54the outstanding work they did
  973. 35:55welcome thank you mr chairman good
  974. 35:58morning mr chairman
  975. 35:59uh i'll just say a very few comments
  976. 36:02and uh ask that my my opening statement
  977. 36:05be entered for the record
  978. 36:06without objection i thank the committee
  979. 36:11for their compliments
  980. 36:12to the board this morning and on behalf
  981. 36:13of the board uh
  982. 36:15i i accept your compliments and i also
  983. 36:18know that the members of this committee
  984. 36:21share the feelings of the board that the
  985. 36:23price
  986. 36:24this nation paid on the first of
  987. 36:26february
  988. 36:27was so dear that it demands now that we
  989. 36:30do our parts
  990. 36:32to do everything possible to ensure that
  991. 36:34an accident like this
  992. 36:35never happens again i would like to
  993. 36:38return the compliment to the congress
  994. 36:42as the congress is aware we were not a
  995. 36:45presidential
  996. 36:46appointed commission
  997. 36:50but due to your oversight
  998. 36:53guidance and cooperation with this board
  999. 36:56the issue of our pedigree was removed
  1000. 37:00from the table early on
  1001. 37:02and all the comments around the town
  1002. 37:06this week are about the merits of the
  1003. 37:09report
  1004. 37:10and not the process by how the report
  1005. 37:12was written and
  1006. 37:14uh the congress shares
  1007. 37:17in the credit for turning that situation
  1008. 37:19into a very positive situation and i
  1009. 37:21thank every member of this committee
  1010. 37:23for assisting us i also would like to
  1011. 37:25join in thanking the
  1012. 37:27my 12 colleagues who essentially gave up
  1013. 37:30seven months of their life to do this
  1014. 37:31report
  1015. 37:32and the over 100 full-time investigators
  1016. 37:35and the thousands of nasa engineers and
  1017. 37:37scientists
  1018. 37:38who helped us with this project
  1019. 37:42when i appeared before you on the 14th
  1020. 37:44of may of this year
  1021. 37:45i made a commitment that our report
  1022. 37:47would put this accident into context
  1023. 37:50there are many contexts of course
  1024. 37:52there's the context of history
  1025. 37:55of budgets of management
  1026. 37:59the context of what previous reviews of
  1027. 38:01nasa have told us
  1028. 38:03and the context of the our nation's
  1029. 38:06vision
  1030. 38:07about human space travel i believe that
  1031. 38:10our report
  1032. 38:10satisfies that requirement and has put
  1033. 38:13this accident
  1034. 38:14into all these contexts first of all of
  1035. 38:17course we did establish
  1036. 38:19the physical cause of this accident the
  1037. 38:21foam did it
  1038. 38:22and by the way for those of you who have
  1039. 38:24never actually seen
  1040. 38:25one of these objects i brought it along
  1041. 38:28this
  1042. 38:29object sitting on the floor over beside
  1043. 38:31me here this is the famous
  1044. 38:33left bipod ramp uh
  1045. 38:36made out of the actual foam and the
  1046. 38:38little black line is approximately where
  1047. 38:40the fracture occurred
  1048. 38:42uh that caused that caused this accident
  1049. 38:44so if you've never seen one this is what
  1050. 38:46one looks like thank you tom
  1051. 38:49the board was very deliberate in coming
  1052. 38:52to the conclusion
  1053. 38:53that the foam did it and
  1054. 38:56the time that it took us to come to that
  1055. 38:59conclusion
  1056. 39:00allowed us to look rather
  1057. 39:02introspectively and
  1058. 39:04intrusively into management at nasa
  1059. 39:08while we were working on the physical
  1060. 39:10cause we had many other people that were
  1061. 39:12looking
  1062. 39:12at how nasa did their business
  1063. 39:14particularly the
  1064. 39:16space shuttle program and we had to ask
  1065. 39:19ourselves
  1066. 39:20if the foam did it was this a legitimate
  1067. 39:24surprise
  1068. 39:25a new event that caught everybody by
  1069. 39:28surprise
  1070. 39:29or if not what is the history behind
  1071. 39:33attempts to understand and fix this
  1072. 39:36event
  1073. 39:37if it was not a legitimate surprise what
  1074. 39:40we found of course was that this was not
  1075. 39:42a surprise
  1076. 39:44nasa had experienced this foam coming
  1077. 39:46off many times in the past
  1078. 39:48and then when we got into the issue of
  1079. 39:50learning how they dealt with this
  1080. 39:52in a scientific and engineering point of
  1081. 39:55view
  1082. 39:56we got into the business about how the
  1083. 39:59shuttle program
  1084. 40:00handles unknowns how they handle risk
  1085. 40:04how they provide for research and
  1086. 40:06development to understand the processes
  1087. 40:09that they're dealing with
  1088. 40:10and how they learn as an institution
  1089. 40:14we were concerned with what we found
  1090. 40:17and that is really what about half of
  1091. 40:19our report is about what we found
  1092. 40:23being concerned with what we found we
  1093. 40:25then embarked upon two paths of
  1094. 40:27investigation
  1095. 40:28simultaneously the first path was an
  1096. 40:31academic review of how high-risk
  1097. 40:35operations ought to be conducted and
  1098. 40:38judged
  1099. 40:39and simultaneously we conducted a review
  1100. 40:42to see whether or not there were
  1101. 40:45practical
  1102. 40:46instances where high risk enterprises
  1103. 40:50around the united states
  1104. 40:51are being managed reliably successfully
  1105. 40:54in other areas and we found plenty of
  1106. 40:58cases
  1107. 40:59where people deal with high-risk
  1108. 41:01technology and high-risk enterprises
  1109. 41:03and do so successfully we took
  1110. 41:06kind of a menu or a recipe from the
  1111. 41:09academic review
  1112. 41:10and a some some examples from the best
  1113. 41:13safety practices around the country
  1114. 41:16put them together in a template and then
  1115. 41:18judged nasa's
  1116. 41:21space shuttle program by that template
  1117. 41:23and found it to be wanting
  1118. 41:26our report then documents extensively in
  1119. 41:29detail
  1120. 41:30each of the issues that we are concerned
  1121. 41:32about along with documentary evidence
  1122. 41:35interviews statements
  1123. 41:40pieces of paper reports that support
  1124. 41:43our conclusion and also our report we
  1125. 41:47feel concludes with specific
  1126. 41:50actionable recommendations to make this
  1127. 41:52shuttle operations
  1128. 41:54more safe i'll conclude mr chairman by
  1129. 41:59adding one comment because it was
  1130. 42:01brought up by the members several times
  1131. 42:03and that is the issue of accountability
  1132. 42:07the board does not feel that
  1133. 42:10there is that people should not be held
  1134. 42:13accountable for their actions
  1135. 42:15the board does believe in accountability
  1136. 42:18and we believe very strongly
  1137. 42:22that we have included in our report
  1138. 42:25plenty of documentary evidence to
  1139. 42:28support
  1140. 42:29accountability if the proper authorities
  1141. 42:33want to hold people accountable
  1142. 42:35it's all in the report we decided long
  1143. 42:38ago
  1144. 42:39made it public and i have defended the
  1145. 42:41position before this committee before
  1146. 42:43that we were not going to make those
  1147. 42:45judgments but we put it all in the
  1148. 42:47report
  1149. 42:47it's all there if somebody the
  1150. 42:50administrator of nasa or
  1151. 42:51or this committee wants to find out
  1152. 42:53whose performance was not up to
  1153. 42:55not up to standard it's all in the
  1154. 42:57report and it should be fairly easy to
  1155. 42:59sort that out
  1156. 43:00we just elected that that in order to
  1157. 43:03pursue
  1158. 43:04the issues that we wanted to pursue we
  1159. 43:07would
  1160. 43:08be better off if we let the proper
  1161. 43:10authorities take care of accountability
  1162. 43:11and it
  1163. 43:12and and we did not come to the judgments
  1164. 43:14but we put all the stuff in the report
  1165. 43:16thank you mr chairman i'm pleased to be
  1166. 43:18here and ready to answer any questions
  1167. 43:20thank you admiral uh mr o'keefe it's a
  1168. 43:23perfect segue into my first question
  1169. 43:26accountability culture
  1170. 43:29needs to be fixed how and when and what
  1171. 43:31accountability do you expect to
  1172. 43:35enforce here in light of admiral
  1173. 43:37gaiman's statement that there's ample
  1174. 43:40evidence of individuals as well
  1175. 43:44as institutions that
  1176. 43:47should be held accountable yes sir no i
  1177. 43:49think as i mentioned in the opening
  1178. 43:51statement
  1179. 43:52the manner in which the board conducted
  1180. 43:53its activities
  1181. 43:55uh was so open so clear in terms of
  1182. 43:58their approach to it and again the
  1183. 43:59approach we used of releasing all the
  1184. 44:01information that supported that
  1185. 44:02investigative activity uh has led to
  1186. 44:05this result
  1187. 44:06and it's pretty clear in terms of what's
  1188. 44:07involved here we've been acting on that
  1189. 44:09as we've moved through
  1190. 44:11uh the shuttle program management team
  1191. 44:12is a completely new
  1192. 44:14team today started from the program
  1193. 44:16manager all the way through all the key
  1194. 44:19players 14 of 15 of the senior folks are
  1195. 44:22apt
  1196. 44:22completely new folks uh in their
  1197. 44:25capacities just in the last couple of
  1198. 44:26months
  1199. 44:27seems to me that's half of
  1200. 44:28accountability mr o'keefe have you held
  1201. 44:31others accountable
  1202. 44:33yes sir as we've worked our way through
  1203. 44:35this there are a range of other
  1204. 44:36participants in this and i think what
  1205. 44:37you see is a management team in place
  1206. 44:39that's different today
  1207. 44:41than it was a year ago to be sure and
  1208. 44:43certainly very different than it was
  1209. 44:44seven months ago
  1210. 44:45does that mean that those who are
  1211. 44:47replaced are accountable
  1212. 44:49the folks who are in positions today
  1213. 44:51will lead in the future and be
  1214. 44:52accountable for this activity those who
  1215. 44:54are not there
  1216. 44:55i think you can draw the conclusion from
  1217. 44:56that
  1218. 45:02when do you expect this culture to be
  1219. 45:05fixed
  1220. 45:07i think admiral gaiman and the board
  1221. 45:09observed in the report this is going to
  1222. 45:11be a long
  1223. 45:12long haul there's no question about it
  1224. 45:15again the first step has got to be
  1225. 45:16without equivocation
  1226. 45:18that we accept the findings we'll comply
  1227. 45:20with the recommendations and we'll
  1228. 45:22embrace this report
  1229. 45:23that's the first critical step in moving
  1230. 45:25towards the role
  1231. 45:27of i think a full acceptance of a
  1232. 45:29culture change
  1233. 45:31and in doing so i think that's going to
  1234. 45:32take time we've got to be very
  1235. 45:34consistent in that message we've got to
  1236. 45:35be very consistent the direction we're
  1237. 45:36going to go
  1238. 45:38and any equivocation to that point i
  1239. 45:41think is going to falter that effort
  1240. 45:43so we've got to be on the long haul
  1241. 45:45proceeding in that direction but i fully
  1242. 45:47anticipate we will see
  1243. 45:49the beginnings of that change within six
  1244. 45:50months to a year to be sure
  1245. 45:53and uh we've begun that process as
  1246. 45:56immediately as the day the report
  1247. 45:58released to assure that everyone
  1248. 45:59understands there is no equivocation on
  1249. 46:02accepting these findings
  1250. 46:03complying with these recommendations and
  1251. 46:05embracing this report
  1252. 46:07admiral gaiman would you describe how
  1253. 46:09congressional earmarks and nasa's
  1254. 46:11transfer of funding from the shuttle
  1255. 46:13program to other programs
  1256. 46:15and the declining nasa budget affected
  1257. 46:17the
  1258. 46:18space shuttle operations and safety
  1259. 46:22i certainly will and we included in our
  1260. 46:25report
  1261. 46:27the plain facts of the matter just so
  1262. 46:29that anybody who wants to do the
  1263. 46:31research can come to
  1264. 46:32come to the conclusion that over a
  1265. 46:34period of about a decade the buying
  1266. 46:36power purchasing power the shuttle
  1267. 46:38program has been reduced by over 40
  1268. 46:40percent
  1269. 46:41really though what has happened in the
  1270. 46:43board's opinion
  1271. 46:44is the very insidious the
  1272. 46:48powerful but nearly invisible force
  1273. 46:51of dissatisfaction the dissatisfaction
  1274. 46:55among several administrations
  1275. 46:58dissatisfaction
  1276. 46:59among several committees of congress and
  1277. 47:01even the administrator of nasa
  1278. 47:04on the extremely expensive
  1279. 47:07cost of operating the shuttle it costs
  1280. 47:09much more to operate the shuttle than
  1281. 47:11everybody
  1282. 47:11will ever admit and uh over the years
  1283. 47:16what has happened is that
  1284. 47:19for one reason or another people have
  1285. 47:22tried to
  1286. 47:23ring money out of the shuttle program in
  1287. 47:24order to pay for other projects
  1288. 47:27nasa has essentially been operating
  1289. 47:28under a flat budget by a flat top line
  1290. 47:31in order to do other things there has
  1291. 47:34been a
  1292. 47:35steady consistent attempt to ring money
  1293. 47:38out of the shuttle program
  1294. 47:40some of it legitimately by efficiency
  1295. 47:42and effectiveness but nevertheless
  1296. 47:45since the shuttle program is so
  1297. 47:47expensive there have been efforts to
  1298. 47:49squeeze money out of the shuttle program
  1299. 47:53it is the board's opinion that the
  1300. 47:56effect of this
  1301. 47:58is that for a number of years
  1302. 48:02after the challenger accident the
  1303. 48:05management scheme of the shuttle program
  1304. 48:08has been changed to a to a very vertical
  1305. 48:12scheme in which the program manager
  1306. 48:16over a period of years has now had
  1307. 48:18become responsible
  1308. 48:20for schedules manifests
  1309. 48:23costs budgets personnel assignments
  1310. 48:26technical specifications and
  1311. 48:28requirements the waivers to technical
  1312. 48:30specifications and requirements
  1313. 48:32and safety and because
  1314. 48:36people were naturally trying to get
  1315. 48:37money out of this very expensive program
  1316. 48:39the program manager began to make trades
  1317. 48:43in that trade space and he began to
  1318. 48:45trade
  1319. 48:46things like research and development
  1320. 48:48into why foam comes off
  1321. 48:51for measures to make the schedule he
  1322. 48:54began to make trades like that
  1323. 48:56and the board was very concerned that
  1324. 48:58that was too much power
  1325. 49:00in one person's hands if it is your goal
  1326. 49:03to know who to blame if something goes
  1327. 49:05wrong
  1328. 49:06having a scheme in which all of that
  1329. 49:08responsibility is placed in the program
  1330. 49:10manager's hands
  1331. 49:11is a really good scheme if you want to
  1332. 49:13know who to blame
  1333. 49:14but if you want to operate safely our
  1334. 49:17study of both the theory and the
  1335. 49:18academics and the best business
  1336. 49:20practices
  1337. 49:21indicates you need to separate the
  1338. 49:22engineering and the safety from the guy
  1339. 49:24who's responsible for the cost and
  1340. 49:26schedule
  1341. 49:26because inevitably they're going to
  1342. 49:29fight with
  1343. 49:30each other and you're going to get a
  1344. 49:31conflict and a person who is being
  1345. 49:33hammered over cost and schedule is going
  1346. 49:35to trade
  1347. 49:36safety and engineering in order to
  1348. 49:38achieve cost and schedule
  1349. 49:39and congressional earmarks congressional
  1350. 49:42earmarks
  1351. 49:43uh uh do a couple of things
  1352. 49:47one thing they do is they they over they
  1353. 49:50they give an overinflated
  1354. 49:53number of the total value of nasa's
  1355. 49:55budget
  1356. 49:56because they make there might be 400 or
  1357. 49:59500 million dollars worth of earmarks
  1358. 50:01but that's not really nasa's money to
  1359. 50:02spend because they can't move it around
  1360. 50:05the administrator loses his flexibility
  1361. 50:07he can't buy more safety and all that
  1362. 50:09stuff probably most of the earmarks
  1363. 50:12that we looked at are are actually ads
  1364. 50:15most of them but not all
  1365. 50:16were ads but even if they were ads it it
  1366. 50:19makes the nasa budget look bigger than
  1367. 50:21it is
  1368. 50:21and it reduces the administrators
  1369. 50:23flexibility for moving money around
  1370. 50:25senator hollings admiral gaiman
  1371. 50:29mr o'keefe appointed you did you find
  1372. 50:31him accountable
  1373. 50:33i did find him accountable and i did
  1374. 50:35find him to be cooperative and i
  1375. 50:37found him to take full responsibility
  1376. 50:39for everything that happened on his
  1377. 50:40watch
  1378. 50:42and by that to answer you what you find
  1379. 50:44him responsible for this
  1380. 50:47disaster let's call it
  1381. 50:51i find that leadership
  1382. 50:54all leaders including mr o'keefe
  1383. 50:57including the congress including the
  1384. 50:58white house
  1385. 51:00are responsible for the conditions that
  1386. 51:02they set for
  1387. 51:03and and that set for the conditions of
  1388. 51:05the performance of their organization
  1389. 51:08almost everything that we complain about
  1390. 51:10every management trait
  1391. 51:13every uh communications problem
  1392. 51:16every engineering problem that we
  1393. 51:18complain about in this report
  1394. 51:20was set in motion between five and 15
  1395. 51:23years ago
  1396. 51:25so that didn't happen on his watch it
  1397. 51:28didn't happen on his watch
  1398. 51:30that's correct almost all of these
  1399. 51:31traits that we're talking about
  1400. 51:33are the are traits that happened from
  1401. 51:36two
  1402. 51:36to five years after the challenger
  1403. 51:38accident that is
  1404. 51:40right after the challenge accident as
  1405. 51:42senator nelson had indicated
  1406. 51:44all the energy and zeal and village
  1407. 51:46vigilance associated with
  1408. 51:48the tragedy causes everybody to do their
  1409. 51:50job really well
  1410. 51:52let me give you a case in point uh the
  1411. 51:55the uh the management of the human space
  1412. 51:57flight program
  1413. 51:58which we used to be in washington dc in
  1414. 52:00the mid 90s was shifted back down to
  1415. 52:03the j to houston again and mr o'keefe
  1416. 52:06brought it back up to washington
  1417. 52:07as rogers had recommended that's an
  1418. 52:09example of how we kind of migrated away
  1419. 52:11from the rogers recommendation admiral i
  1420. 52:13understand but you've taken over a ship
  1421. 52:15as a navy animal
  1422. 52:16time and again perhaps at a different
  1423. 52:19rank and
  1424. 52:21you didn't put off what happened 15
  1425. 52:24years ago to the ship
  1426. 52:25and 10 years ago to the ship i'm not
  1427. 52:28trying to embarrass anybody we're all
  1428. 52:30friends but i'm trying to break past
  1429. 52:33this
  1430. 52:34culture finding and fix responsibility
  1431. 52:38and you have categorically said you
  1432. 52:40didn't
  1433. 52:41attempt to do that fix responsibility
  1434. 52:43you got enough facts
  1435. 52:46where it would indicate it didn't hold
  1436. 52:48them up the standard now
  1437. 52:50uh mr o'keefe has made a very
  1438. 52:51categorical
  1439. 52:53and convincing statement about uh we've
  1440. 52:56got the message
  1441. 52:57and everything else that mr o'keefe
  1442. 53:00right after this occurred
  1443. 53:04chairman mccain and myself were informed
  1444. 53:07immediately that they had tried their
  1445. 53:09best to take images
  1446. 53:11take pictures of the uh damage
  1447. 53:14done or the shuttle in flight and uh
  1448. 53:18i think it was two perhaps three times
  1449. 53:21uh the
  1450. 53:22that is the defense department was ready
  1451. 53:24to do it
  1452. 53:25uh but that it was a formality about
  1453. 53:28requesting it
  1454. 53:30and the uh request was made and then was
  1455. 53:34canceled
  1456. 53:35in fact i understand that uh linda hamm
  1457. 53:38the chairman of the
  1458. 53:39management team was responsible she
  1459. 53:42consulted with ralph
  1460. 53:44rowe the manager of the space shuttle
  1461. 53:47vehicle engineering office and that
  1462. 53:52the imagery requests haven't been made
  1463. 53:55to the defense department was cancelled
  1464. 53:59by none other than linda ham
  1465. 54:02who's now been just reassigned over to
  1466. 54:05houston
  1467. 54:06in another office and of all things
  1468. 54:08where you say i get it
  1469. 54:10we gonna do it the categorically we're
  1470. 54:12gonna take every issue we're gonna do
  1471. 54:13everything
  1472. 54:14we put mr rowe as number two at the
  1473. 54:17safety office
  1474. 54:18that doesn't indicate to me that you got
  1475. 54:20it
  1476. 54:22officer um again the approach we've
  1477. 54:26taken here
  1478. 54:27is to completely designate
  1479. 54:30for the management effort the folks who
  1480. 54:32are prepared to lead in the time ahead
  1481. 54:35and in dealing with the range of
  1482. 54:38folks who participated in this activity
  1483. 54:40and clearly the report
  1484. 54:42lays it out as does admiral gaiman's
  1485. 54:44commentary i think the approach we've
  1486. 54:46got to take is put
  1487. 54:48the best judgment to picking the
  1488. 54:49leadership team for the program
  1489. 54:51management office
  1490. 54:52as well as all the efforts we're engaged
  1491. 54:54in here in washington and across the
  1492. 54:56centers
  1493. 54:56towards this activity and picking the
  1494. 54:58best people to do that that's who's in
  1495. 55:00place today this is the best leadership
  1496. 55:01there
  1497. 55:02and that's the approach we've taken to
  1498. 55:04this and that certainly is uh is a
  1499. 55:07measure of accountability on that point
  1500. 55:09there is no question and i appreciate
  1501. 55:10admiral gaiman's
  1502. 55:12observation i am personally accountable
  1503. 55:13for this i view this as my personal
  1504. 55:15responsibility
  1505. 55:16i serve at the pleasure of the president
  1506. 55:18at which point he decides that is no
  1507. 55:20longer
  1508. 55:20his pleasure i'm certainly ready to
  1509. 55:22adhere to that and my
  1510. 55:23obligation between now and the time he
  1511. 55:25may reach that decision
  1512. 55:27is do my level best to assure that we
  1513. 55:30accept these findings comply with these
  1514. 55:32recommendations and embrace this report
  1515. 55:34and we intend to do just that but that's
  1516. 55:36the best you can do is take mr ralph
  1517. 55:38rowe
  1518. 55:39who failed in safety he said i don't
  1519. 55:41want the pictures i don't want to find
  1520. 55:43out about the safety at all
  1521. 55:44in fact we all saw this on tv they kept
  1522. 55:47dissembling and
  1523. 55:49i forget that fellow widamore and
  1524. 55:50everything else like that we found
  1525. 55:52all kind of defensiveness we we
  1526. 55:55mentioned this last february when we had
  1527. 55:57the hearing
  1528. 55:59and now we find out having got it and
  1529. 56:01gonna do this and gonna do that
  1530. 56:03because i think with senator hanoi
  1531. 56:06and senator stevens and myself were the
  1532. 56:08only three
  1533. 56:09here at the time of the challenger we
  1534. 56:12heard us all this
  1535. 56:13before so there's no education in the
  1536. 56:16second kick of a mule i mean i'm finding
  1537. 56:18out
  1538. 56:19and listening to the same thing i
  1539. 56:21listened to 17 years ago
  1540. 56:23and we've lost seven astronauts now uh
  1541. 56:28they talk about an accident but it was
  1542. 56:30an avoidable accident
  1543. 56:31you talk about failures but that was an
  1544. 56:34avoidable failure
  1545. 56:36and here to make sure that we don't have
  1546. 56:39that same failure again you take the man
  1547. 56:41who failed in safety and appoint them to
  1548. 56:43number two in the safety office
  1549. 56:45well sir no i'd just be to be
  1550. 56:47technically clear about this he
  1551. 56:48that's not the position it's assuming
  1552. 56:50here we've set up and we're creating as
  1553. 56:52of this
  1554. 56:53time next month is a engineering and
  1555. 56:56safety center
  1556. 56:57which will perform at least at minimum
  1557. 56:59among these recommendations of the 29
  1558. 57:02trend analysis in other words be removed
  1559. 57:05from the operational conduct of the
  1560. 57:06activity
  1561. 57:07and look at what the prior trends would
  1562. 57:09be to see if we can identify
  1563. 57:10those cases in which we have missed
  1564. 57:13things and we clearly missed the foam on
  1565. 57:15this one
  1566. 57:16that's the point that's raised in this
  1567. 57:18report very clearly there were seven
  1568. 57:19instances
  1569. 57:20and had we conducted that trend analysis
  1570. 57:23independent of the operational
  1571. 57:24imperatives
  1572. 57:25of flying the shuttle we might have
  1573. 57:27caught it and that's what this new
  1574. 57:29organization is going to do and in that
  1575. 57:30regard we're trying to assemble
  1576. 57:32engineers who will be removed from that
  1577. 57:33operational activity and be able to step
  1578. 57:35back with a fresh set of eyes
  1579. 57:37who are knowledgeable about the
  1580. 57:39mechanics of this process
  1581. 57:41and at the langley research center
  1582. 57:42organize all those disciplines among
  1583. 57:45structures and aerospace engineers
  1584. 57:47in order to look at those observable
  1585. 57:49trends and see if we can identify what
  1586. 57:51that next instance might be
  1587. 57:53and you need the folks who've got the
  1588. 57:54experience to do that and in my judgment
  1589. 57:57to borrow a page from verna von braun
  1590. 58:00when you make a mistake you become that
  1591. 58:02much more valuable the next time around
  1592. 58:03to seeing
  1593. 58:04exactly where that'll never be repeated
  1594. 58:06again and there are this great value in
  1595. 58:08some of that
  1596. 58:09and it's something we'll certainly test
  1597. 58:11and let the measure of what we do
  1598. 58:14be the final conclusion of your
  1599. 58:17assessment on this as opposed to what we
  1600. 58:18say
  1601. 58:19if we follow through and what we're
  1602. 58:20saying we're going to do let that be the
  1603. 58:22measure of proof and in that regard
  1604. 58:23senator
  1605. 58:24i view that as a very high standard we
  1606. 58:26need to meet
  1607. 58:29senator sununu
  1608. 58:33thank you uh administrator keith
  1609. 58:37o'keefe could you talk a little bit
  1610. 58:39about the um
  1611. 58:40the return to flight team uh the makeup
  1612. 58:42of the team
  1613. 58:43um the timeline that they're gonna
  1614. 58:45operate under and what you think their
  1615. 58:48biggest challenges will be
  1616. 58:49in uh and getting the job done uh before
  1617. 58:53we can even entertain the idea of the
  1618. 58:54shuttle returning to space yes sir no
  1619. 58:56thank you very much for the question
  1620. 58:57um the return to flight team is composed
  1621. 59:01uh and led by colonel jim halsell who's
  1622. 59:04a
  1623. 59:04air force colonel and a uh an astronaut
  1624. 59:07of four different flights previously
  1625. 59:11he is slated to be the commander of the
  1626. 59:13sts-120 flight which is six flights
  1627. 59:16after
  1628. 59:16the return to flight activity had been
  1629. 59:18slated before the accident
  1630. 59:20so he has a very very strong vested
  1631. 59:22interest making sure we get this right
  1632. 59:24uh he's ably assisted by a very
  1633. 59:26extensive team
  1634. 59:27throughout the uh the four space flight
  1635. 59:30centers
  1636. 59:31uh johnson uh marshall kennedy
  1637. 59:34and stennis in the effort in order to
  1638. 59:37assure that we have
  1639. 59:38pulled together all 29 of these
  1640. 59:40recommendations as well as
  1641. 59:42again the raise the bar objectives that
  1642. 59:44we've established and it'll be
  1643. 59:45included in this report which we're uh
  1644. 59:48be releasing here later this week early
  1645. 59:50next
  1646. 59:51which encompasses and covers all of
  1647. 59:53those recommendations plus all the
  1648. 59:54observations and every other issue
  1649. 59:57that we have come across to raise the
  1650. 59:59bar raise the standard
  1651. 1:00:00that we're anticipating before we return
  1652. 1:00:02to flight that's overseen by
  1653. 1:00:05a an internal senior management team of
  1654. 1:00:09bill reedy who is also
  1655. 1:00:10a veteran astronaut who is the associate
  1656. 1:00:12administrator for space flight
  1657. 1:00:14and michael greenfield who is a uh
  1658. 1:00:17the associate deputy administrator for
  1659. 1:00:19technical programs
  1660. 1:00:20and they're managing across the entire
  1661. 1:00:22agency so we we gather
  1662. 1:00:24all of the information from the other
  1663. 1:00:26six centers that are not space flight
  1664. 1:00:28related
  1665. 1:00:29in dealing with this particular set of
  1666. 1:00:30objectives there's a range of
  1667. 1:00:31capabilities we have
  1668. 1:00:33across the agency all of which will be
  1669. 1:00:35brought to bear and employed
  1670. 1:00:36and there isn't any ambiguity i think
  1671. 1:00:39among the leadership of the agency this
  1672. 1:00:40is
  1673. 1:00:41all of our agency objective finally the
  1674. 1:00:44the oversight of our activities will be
  1675. 1:00:47reviewed by
  1676. 1:00:48a external panel led by tom stafford
  1677. 1:00:51a veteran apollo and gemini astronaut
  1678. 1:00:54and dick covey who was the pilot
  1679. 1:00:56on the flight immediately after
  1680. 1:00:57challenger in september of 1988
  1681. 1:01:00and 25 other experts in the fields of
  1682. 1:01:02engineering
  1683. 1:01:03uh of uh management change of culture
  1684. 1:01:06change academics industry folks the full
  1685. 1:01:10range and a background of management as
  1686. 1:01:12well as technical expertise
  1687. 1:01:14to assure that we have implemented these
  1688. 1:01:16recommendations and that we have
  1689. 1:01:17selected options that are compliant
  1690. 1:01:20and will make this a agency stronger all
  1691. 1:01:22those folks are external
  1692. 1:01:24experts in that regard they have already
  1693. 1:01:26met once they've got the the framework
  1694. 1:01:28of the implementation plan they'll meet
  1695. 1:01:30again early next week
  1696. 1:01:32and they'll be working through this all
  1697. 1:01:33the way through that time and beyond
  1698. 1:01:35our return to flight efforts so we've
  1699. 1:01:37got this at three different uh
  1700. 1:01:39levels in order to assure that we are
  1701. 1:01:41not uh singing ourselves to sleep on any
  1702. 1:01:43individual
  1703. 1:01:44uh solution here or picking our favorite
  1704. 1:01:47option
  1705. 1:01:48at the expense of what may be a better
  1706. 1:01:49approach will their focus be
  1707. 1:01:52on the 15 or so return to flight
  1708. 1:01:54recommendations or are they going to
  1709. 1:01:56have
  1710. 1:01:56a a broader um
  1711. 1:01:59task of looking at the all 29
  1712. 1:02:02recommendations plus the ones that
  1713. 1:02:04in your words would would raise the bar
  1714. 1:02:06for nasa yes sir the entire
  1715. 1:02:09package everything and we certainly you
  1716. 1:02:11know i mean taking the board's
  1717. 1:02:13statements absolutely literally it says
  1718. 1:02:16it these 15 must be implemented prior to
  1719. 1:02:18that time
  1720. 1:02:19and we take that as being a a fact a
  1721. 1:02:21finding
  1722. 1:02:22that we are not going to dispute and
  1723. 1:02:24will certainly move towards but nothing
  1724. 1:02:25is being done
  1725. 1:02:27on those 15 at the expense of all the
  1726. 1:02:29others that are engaged in there because
  1727. 1:02:30we may find and we certainly have
  1728. 1:02:32dealt with a number of different uh
  1729. 1:02:35aspects
  1730. 1:02:36during the course this aiding this
  1731. 1:02:37investigation that we believe
  1732. 1:02:40rise to that same kind of standard of
  1733. 1:02:42the 15 as well that we will be
  1734. 1:02:43implementing prior to return flight
  1735. 1:02:45admiral gaiman you talk about in the
  1736. 1:02:48report i think is pretty clear about
  1737. 1:02:50identifying a causal relationship
  1738. 1:02:53between the foam
  1739. 1:02:55striking the leading edge of the wing
  1740. 1:02:57and that leading to the accident
  1741. 1:02:59and just following this through the
  1742. 1:03:02press
  1743. 1:03:02and and through the the work of the uh
  1744. 1:03:06the board it's clear that a lot of
  1745. 1:03:08technical effort went into
  1746. 1:03:10assessing uh that the cause of the
  1747. 1:03:13accident
  1748. 1:03:14my question however is where
  1749. 1:03:18are the greatest uncertainties i mean we
  1750. 1:03:20can't know everything about the accident
  1751. 1:03:22so where in the the mind of the board
  1752. 1:03:24collective mind of the border the
  1753. 1:03:26greatest
  1754. 1:03:26uncertainties with regard to the
  1755. 1:03:30physical causes of the accident or the
  1756. 1:03:33the physical findings of of how uh
  1757. 1:03:36the the shuttle came down
  1758. 1:03:39well the board the board deliberated
  1759. 1:03:41long and hard and we had quite a
  1760. 1:03:43wrestling match over the
  1761. 1:03:45words that we we would use to describe
  1762. 1:03:47the physical cause
  1763. 1:03:49by that i mean we could have used words
  1764. 1:03:51like
  1765. 1:03:52all the evidence supports that the foam
  1766. 1:03:54did it or the most probable cause is the
  1767. 1:03:57foam did it
  1768. 1:03:58we elected not to do that we elected to
  1769. 1:04:00say the phone did it
  1770. 1:04:01and that is based on overwhelming uh
  1771. 1:04:04confirming evidence multiple different
  1772. 1:04:06avenues of investigation all of which
  1773. 1:04:08point to the same thing
  1774. 1:04:10we do not have a picture of a leading
  1775. 1:04:13edge system with a hole in it
  1776. 1:04:16uh that would have been nice that would
  1777. 1:04:17have been confirmation that the foam did
  1778. 1:04:19it
  1779. 1:04:19we don't have any such a thing as that
  1780. 1:04:21but we are absolutely
  1781. 1:04:23positively convinced without beyond a
  1782. 1:04:25shadow of a doubt
  1783. 1:04:26of the physical cause of this accident
  1784. 1:04:28and and there's no doubt in her mind
  1785. 1:04:30whatsoever
  1786. 1:04:32we were we were concerned though that in
  1787. 1:04:34order for us to reach that conclusion
  1788. 1:04:36we had to do some physical tests and
  1789. 1:04:38conduct some tests that we thought nasa
  1790. 1:04:39should have been doing
  1791. 1:04:40all along there's no element of the
  1792. 1:04:44system or the technical work that you
  1793. 1:04:46did
  1794. 1:04:46that frustrated the board members
  1795. 1:04:50again absent a picture but were there
  1796. 1:04:52any other areas of
  1797. 1:04:54technical investigation where you had to
  1798. 1:04:56walk away saying we we don't have all
  1799. 1:04:58the information we would like about
  1800. 1:05:00the nature of the failure damage inside
  1801. 1:05:04the wing
  1802. 1:05:05the way that the the the shuttle
  1803. 1:05:07eventually came apart no uncertainties
  1804. 1:05:09there
  1805. 1:05:09only one uh just one and that is that in
  1806. 1:05:12its it's in our report
  1807. 1:05:14there's a nice little chart in there
  1808. 1:05:16that shows the roll and yaw moments
  1809. 1:05:18that are reconstructed from the from the
  1810. 1:05:21very extensive
  1811. 1:05:23uh data data recorders which are on
  1812. 1:05:25board the shuttle
  1813. 1:05:26and uh both of the roll and yaw moments
  1814. 1:05:29show
  1815. 1:05:29show the shuttle left wing losing lift
  1816. 1:05:33due to damage and the role in the aw
  1817. 1:05:36starting in one direction and then for
  1818. 1:05:38some reason the
  1819. 1:05:39the uh the uh one of them
  1820. 1:05:43the role moment reverses and uh
  1821. 1:05:47uh and and we can't explain why that
  1822. 1:05:50happens it probably it's probably due to
  1823. 1:05:52a deformation of the wing of some
  1824. 1:05:54some sort but of the hundreds of pieces
  1825. 1:05:56of technical data that we looked at
  1826. 1:05:58all of which point to a hole in the left
  1827. 1:06:00leading edge
  1828. 1:06:01that's the only one that we can't
  1829. 1:06:03absolutely scientifically explain
  1830. 1:06:06mr chairman can i add just one point
  1831. 1:06:08very quickly the approach that the board
  1832. 1:06:10took that i found to be
  1833. 1:06:12very impressive was they never fell in
  1834. 1:06:14love with one
  1835. 1:06:15scenario they by by process of
  1836. 1:06:18elimination worked their way through a
  1837. 1:06:19fall tree analysis that included
  1838. 1:06:21every possible permutation and then
  1839. 1:06:23closed those avenues
  1840. 1:06:25to reach the conclusions they did so
  1841. 1:06:28we're as informed by the things that
  1842. 1:06:30they examined that have nothing to do
  1843. 1:06:31with this accident and their judgment
  1844. 1:06:34as we are about the things that they
  1845. 1:06:35claim do have a specific uh
  1846. 1:06:38contribution because there are a number
  1847. 1:06:40of things they found
  1848. 1:06:41that are they're equally problematic
  1849. 1:06:44on some future activity unless we
  1850. 1:06:46correct it and so this is a very
  1851. 1:06:48thorough extremely extensive
  1852. 1:06:50investigation that i believe in our
  1853. 1:06:5245-year history has never been conducted
  1854. 1:06:54to this depth
  1855. 1:06:55ever and so it has uncovered a number of
  1856. 1:06:58things that
  1857. 1:06:59are extremely helpful in our pursuit of
  1858. 1:07:01the returned flight which is then
  1859. 1:07:03informed that
  1860. 1:07:04raise the bar a set of standards of
  1861. 1:07:06where we intend to go
  1862. 1:07:07in our pursuit of return to flight when
  1863. 1:07:10we're fit to fly thanks very much mr
  1864. 1:07:15chairman
  1865. 1:07:15and uh i start by uh saying to our
  1866. 1:07:18friend and colleague senator hollings
  1867. 1:07:21that
  1868. 1:07:22your commentary this morning just
  1869. 1:07:25confirms that
  1870. 1:07:26we we listen and listen carefully add
  1871. 1:07:29good things
  1872. 1:07:30say and just because you're out here
  1873. 1:07:32doesn't mean that you have to go quiet
  1874. 1:07:34and just
  1875. 1:07:35remember that uh and uh to you mr
  1876. 1:07:38chairman for holding uh this
  1877. 1:07:40this hearing uh and the uh hearings that
  1878. 1:07:44we've uh
  1879. 1:07:44traditionally had here and have been
  1880. 1:07:47very informative and and very open and
  1881. 1:07:50admirable game and i commend you i
  1882. 1:07:52haven't had a chance to fully read
  1883. 1:07:54your report but it's sprinkled with a
  1884. 1:07:58candor
  1885. 1:07:59that we rarely see in reports
  1886. 1:08:02to government because there's always a
  1887. 1:08:05program to make sure that we don't
  1888. 1:08:07offend this party or that party
  1889. 1:08:09and i think that you went right to it
  1890. 1:08:12and
  1891. 1:08:13uh how that particular how this
  1892. 1:08:15particular
  1893. 1:08:16tragic accident happened is critical
  1894. 1:08:19because of the loss of life
  1895. 1:08:21and the loss of confidence and all of
  1896. 1:08:23those things but more importantly
  1897. 1:08:26is how did we get there in the first
  1898. 1:08:28place
  1899. 1:08:29and when i look at your the executive
  1900. 1:08:31summary of
  1901. 1:08:32your report and you say that
  1902. 1:08:36the organizational causes of the
  1903. 1:08:38accident are rooted in the space shuttle
  1904. 1:08:39programs
  1905. 1:08:40history and culture that means there are
  1906. 1:08:42things been going on for a long time at
  1907. 1:08:44least you felt so
  1908. 1:08:45and so did your colleagues on on the
  1909. 1:08:47report who approved this
  1910. 1:08:48this statement the fact of the matter is
  1911. 1:08:51that in some ways
  1912. 1:08:53it was the tragedy waiting to happen
  1913. 1:08:57because uh i i see in reports
  1914. 1:09:00and mr chairman i want to submit a uh a
  1915. 1:09:03report that comes from
  1916. 1:09:05the international federation of
  1917. 1:09:07professional technical
  1918. 1:09:09engineers uh it's their report on the
  1919. 1:09:11effectiveness of nasa's workforce and
  1920. 1:09:13contractor policies and i think there
  1921. 1:09:15are
  1922. 1:09:16there's something to be learned from
  1923. 1:09:17this and i again asked
  1924. 1:09:19the request that this be included uh in
  1925. 1:09:22the
  1926. 1:09:22in the record one of the objection one
  1927. 1:09:25of the things that they noted
  1928. 1:09:26in their report was that uh
  1929. 1:09:31when uh a previous administrator and i i
  1930. 1:09:34can't be delicate here and it's not in
  1931. 1:09:37criticism it's just the
  1932. 1:09:38information that i look at it daniel
  1933. 1:09:41gold nasa's administrator from 1992-2001
  1934. 1:09:45appointed and directed to cut nasa's
  1935. 1:09:48budget and bring fiscal discipline
  1936. 1:09:51uh of the business world to the nation's
  1937. 1:09:53premier of science
  1938. 1:09:55uh the agency was then put under a
  1939. 1:09:57management
  1940. 1:09:58uh plan called fbc faster
  1941. 1:10:02better cheaper and i wonder
  1942. 1:10:05if you'd make a comment about
  1943. 1:10:09the availability of resource
  1944. 1:10:12did the 1700 nasa employees have the
  1945. 1:10:16capacity and i mentioned this is my
  1946. 1:10:18in my comments earlier to supervise 18
  1947. 1:10:21000
  1948. 1:10:21contractor workers was there
  1949. 1:10:26any failure in your view
  1950. 1:10:29that lay heavily at the doorstep of the
  1951. 1:10:32contractors
  1952. 1:10:33to provide the kinds of service that
  1953. 1:10:36might have averted this catastrophe
  1954. 1:10:40thank you senator the the board found
  1955. 1:10:44uh and we looked at this extraordinarily
  1956. 1:10:47hard we interviewed hundreds of people
  1957. 1:10:50we walked the shop floors
  1958. 1:10:51of all the centers all over the country
  1959. 1:10:54where
  1960. 1:10:55component components are made and we did
  1961. 1:10:58not
  1962. 1:10:58find absolutely cases where the
  1963. 1:11:00contractors were taking shortcuts or
  1964. 1:11:03were cheating
  1965. 1:11:04or weren't doing their job well we
  1966. 1:11:06didn't find any cases like that
  1967. 1:11:08the board did fine however and it's in
  1968. 1:11:12our report
  1969. 1:11:13that the the uh the management level
  1970. 1:11:17that is the vertical level
  1971. 1:11:20that the program has decided to
  1972. 1:11:23contract to seem to us to be a little
  1973. 1:11:28too high
  1974. 1:11:29by that i mean it appeared to us that
  1975. 1:11:32they were contracting out management
  1976. 1:11:34functions
  1977. 1:11:35they were they were almost to the point
  1978. 1:11:37where they were contracting out
  1979. 1:11:38government functions
  1980. 1:11:41and it and it appeared to us that we
  1981. 1:11:43didn't find anything wrong
  1982. 1:11:45i mean we didn't find anybody doing
  1983. 1:11:46anything wrong in that case
  1984. 1:11:48but what we found was then was that when
  1985. 1:11:50the government had to make a decision
  1986. 1:11:52they no longer had the technical
  1987. 1:11:54expertise because the function that they
  1988. 1:11:56were supposed to be supervising was
  1989. 1:11:58being done by a contractor
  1990. 1:11:59and you if you look at the mission
  1991. 1:12:01management team decision making
  1992. 1:12:03you see them consulting people that are
  1993. 1:12:06experts on whether or not this is a
  1994. 1:12:07problem
  1995. 1:12:08and they're all contractors and there
  1996. 1:12:10doesn't seem to be a government person
  1997. 1:12:12who has the technical knowledge anymore
  1998. 1:12:14because they contracted it all out
  1999. 1:12:16so we didn't find any wrong doing i
  2000. 1:12:19understand but we did find
  2001. 1:12:21that perhaps in our it did appear to us
  2002. 1:12:23that
  2003. 1:12:24the government had uh because so many of
  2004. 1:12:28the oversight functions were being done
  2005. 1:12:30by contractors
  2006. 1:12:31the expertise goes with the function and
  2007. 1:12:34we found that the us government uh
  2008. 1:12:35was short was seem to be to be
  2009. 1:12:37shortchanged
  2010. 1:12:39so if there isn't blame and
  2011. 1:12:42i understand very clearly what you said
  2012. 1:12:45then uh
  2013. 1:12:46structure certainly was one of the
  2014. 1:12:48problems and i assume therefore
  2015. 1:12:51is a continuing or might be a continuing
  2016. 1:12:54problem the question is
  2017. 1:12:56whether or not we're prepared to devote
  2018. 1:12:58the resources
  2019. 1:12:59to building this organization's capacity
  2020. 1:13:03to the point that it needs to go on
  2021. 1:13:06these
  2022. 1:13:06relatively dangerous missions we know
  2023. 1:13:09they're dangerous
  2024. 1:13:10and we try our best to protect uh
  2025. 1:13:12everybody involved with the program but
  2026. 1:13:15is there an is there enough resource
  2027. 1:13:19senator mccain's question about
  2028. 1:13:22what what earmarks do well it robs the
  2029. 1:13:25camp
  2030. 1:13:25the program of its appropriate funds
  2031. 1:13:29to get this job done mr o'keefe how do
  2032. 1:13:32you what do you
  2033. 1:13:32what do you think about the resource on
  2034. 1:13:34this
  2035. 1:13:37uh again it is a a very subjective
  2036. 1:13:41matter
  2037. 1:13:42and it is one that uh that's why we
  2038. 1:13:44hired you
  2039. 1:13:45yes sir i fully understand and and
  2040. 1:13:48my judgment on it is that we have the
  2041. 1:13:50resources necessary to continue
  2042. 1:13:52operations uh in a way that is
  2043. 1:13:54responsible the points that admiral
  2044. 1:13:56gaiman has raised
  2045. 1:13:58i think has been echoed in a uh
  2046. 1:14:00congressional budget office report that
  2047. 1:14:02if you permit me mr chairman i'll submit
  2048. 1:14:04for the record as well released just
  2049. 1:14:05last month
  2050. 1:14:06that compares this effort and the
  2051. 1:14:08resources and the way it's conducted
  2052. 1:14:10relative to other
  2053. 1:14:12major what they refer to as
  2054. 1:14:13technologically complex tasks
  2055. 1:14:15performed similarly at other agencies
  2056. 1:14:18and departments across the federal
  2057. 1:14:19government and find
  2058. 1:14:20no remarkable distinctions in that
  2059. 1:14:22regard having said that
  2060. 1:14:24the observations again the depth of this
  2061. 1:14:26investigation is deeper than
  2062. 1:14:28any i have ever been involved in in my
  2063. 1:14:30public service time
  2064. 1:14:32and as a consequence the observations of
  2065. 1:14:35the board and the findings of the board
  2066. 1:14:37are going to inform us as we go through
  2067. 1:14:40the
  2068. 1:14:41examination of the space flight
  2069. 1:14:43operations contract which comes up for
  2070. 1:14:45renewal in a year
  2071. 1:14:46in order to figure out exactly how we
  2072. 1:14:48change that alteration
  2073. 1:14:50based on the the findings
  2074. 1:14:52recommendations and basic views
  2075. 1:14:54expressed in this report there's a lot
  2076. 1:14:56to be learned from that
  2077. 1:14:57and while the the surface coverage even
  2078. 1:15:00from cbo says not a lot of comparability
  2079. 1:15:03difference between
  2080. 1:15:04other major systems integration programs
  2081. 1:15:06that's not good enough as far as we're
  2082. 1:15:08concerned
  2083. 1:15:08because the findings of this board are
  2084. 1:15:11fact and we
  2085. 1:15:12intend to run that to ground to find out
  2086. 1:15:14how we alter the contractual
  2087. 1:15:15arrangements as well as our own conduct
  2088. 1:15:17in order to do this stronger in a better
  2089. 1:15:19way
  2090. 1:15:20thank you thank you senator hutchinson
  2091. 1:15:24thank you mr chairman uh mr o'keefe were
  2092. 1:15:27you ever advised
  2093. 1:15:29or aware during the columbia mission
  2094. 1:15:31that there was
  2095. 1:15:32a serious problem or any problem from
  2096. 1:15:35the foam strike on liftoff
  2097. 1:15:38no
  2098. 1:15:42i'd like to pursue the issue of
  2099. 1:15:45resources again
  2100. 1:15:47mr o'keefe you had a scientific advisory
  2101. 1:15:51board that
  2102. 1:15:52you asked to come together and determine
  2103. 1:15:55what the resources of nasa should cover
  2104. 1:15:59what should be the mission you've got
  2105. 1:16:01the report back
  2106. 1:16:04i would ask you if you think you have
  2107. 1:16:06the resources
  2108. 1:16:07to implement that re report
  2109. 1:16:10and establish a vision that not only
  2110. 1:16:14is scientifically viable but that the
  2111. 1:16:17american people
  2112. 1:16:19can see the necessity
  2113. 1:16:23to continue yes ma'am the the very
  2114. 1:16:26specific
  2115. 1:16:26uh review that we asked and i think
  2116. 1:16:28you're referring to
  2117. 1:16:30is the scientific prioritization to be
  2118. 1:16:32conducted aboard the international space
  2119. 1:16:33station
  2120. 1:16:34that was conducted last summer and early
  2121. 1:16:36fall
  2122. 1:16:37we have in fact assessed that the
  2123. 1:16:40prioritization
  2124. 1:16:40is the scientific objective uh agenda
  2125. 1:16:43that we will pursue on international
  2126. 1:16:45space station and the funds necessary to
  2127. 1:16:48conduct that activity is contained in
  2128. 1:16:49the president's budget that's before the
  2129. 1:16:51congress pending now
  2130. 1:16:52uh to pursue that through for fiscal
  2131. 1:16:54year 2004 through
  2132. 1:16:562008 as a projection so that clearly is
  2133. 1:16:59our
  2134. 1:17:00intent we're going to follow that
  2135. 1:17:01prioritization that's what the findings
  2136. 1:17:03of the uh
  2137. 1:17:04of that scientific group was and
  2138. 1:17:06representing all the disciplines of what
  2139. 1:17:08could be conducted on international
  2140. 1:17:09space station
  2141. 1:17:10and proceed from there to the larger
  2142. 1:17:12question you posed though i think the
  2143. 1:17:13issue that we've tried to
  2144. 1:17:15to codify and as part of this year's
  2145. 1:17:16strategic plan it was released along
  2146. 1:17:18with the budget as well
  2147. 1:17:20is an effort to be very selective about
  2148. 1:17:22the areas we intend to pursue
  2149. 1:17:24and apply those resources as extensively
  2150. 1:17:27as need be in order to do an
  2151. 1:17:28extraordinary job in those areas
  2152. 1:17:30and then for those areas that don't fit
  2153. 1:17:32within the category
  2154. 1:17:33of our three primary mission areas that
  2155. 1:17:36we simply
  2156. 1:17:37not attempt to do them you know
  2157. 1:17:40passingly but not just not elect not to
  2158. 1:17:42do them at all
  2159. 1:17:43and instead be very selective about what
  2160. 1:17:44we do and i think the budget and the
  2161. 1:17:46strategy that's before you
  2162. 1:17:47is our attempt to try to pursue that
  2163. 1:17:49certainly things changed
  2164. 1:17:51on the first february and that's what we
  2165. 1:17:53need to assess and go back and continue
  2166. 1:17:54to relook this
  2167. 1:17:56relative to the board's findings and the
  2168. 1:17:58approach that we intend to take
  2169. 1:17:59so if i could summarize you think that
  2170. 1:18:01you have set the priorities
  2171. 1:18:02and you have the resources necessary to
  2172. 1:18:06accomplish those top priorities and
  2173. 1:18:09leave the ones at the bottom
  2174. 1:18:11by the wayside in the scientific
  2175. 1:18:13objectives the answer is yes
  2176. 1:18:14and again in terms of our performance of
  2177. 1:18:16those activities we're going to be
  2178. 1:18:18guided by
  2179. 1:18:18other additional views that the board
  2180. 1:18:20may have found here as we go through
  2181. 1:18:22this
  2182. 1:18:22to upgrade update and improve this
  2183. 1:18:25approach towards it but in terms of the
  2184. 1:18:27science priorities
  2185. 1:18:28i think you're exactly right that effort
  2186. 1:18:30a year ago was
  2187. 1:18:31the first time we'd ever had a
  2188. 1:18:32prioritization set that began with the
  2189. 1:18:34number one
  2190. 1:18:35and moved progressively through two
  2191. 1:18:37three four and five
  2192. 1:18:38prior that everything was the number one
  2193. 1:18:40priority which therefore meant nothing
  2194. 1:18:42was a priority
  2195. 1:18:43uh i'd like to ask admiral gaiman um
  2196. 1:18:46it's clear from your report um that
  2197. 1:18:50there was insufficient resource and that
  2198. 1:18:53nasa was stretched too thin
  2199. 1:18:56to achieve its multiple goals
  2200. 1:19:00do you believe that the agency is
  2201. 1:19:04more budget driven than mission driven
  2202. 1:19:07in the past not going forward obviously
  2203. 1:19:09because
  2204. 1:19:10we're indicating that there is going to
  2205. 1:19:13be a change but
  2206. 1:19:14do you think it was too budget-driven
  2207. 1:19:17rather than mission driven we
  2208. 1:19:20we believe that the uh budgets had a lot
  2209. 1:19:23to do
  2210. 1:19:24with what happened with how the
  2211. 1:19:27management system morphed over the years
  2212. 1:19:31and we believe that budgets are one of
  2213. 1:19:34the constraints on the program yes
  2214. 1:19:36ma'am for example uh i was just looking
  2215. 1:19:39through the
  2216. 1:19:40report i was going to try and find the
  2217. 1:19:41quote the page to you normally i'm
  2218. 1:19:43like a bible preacher i can quote the
  2219. 1:19:45page that everything is i couldn't find
  2220. 1:19:46it
  2221. 1:19:47there's a little uh sidebar in there
  2222. 1:19:49which talks about the shuttle upgrade
  2223. 1:19:50program
  2224. 1:19:52uh the shuttle upgrade program is
  2225. 1:19:54essentially unfunded
  2226. 1:19:55uh there's a recommendation in here that
  2227. 1:19:58if you're going to fly this shuttle
  2228. 1:20:00beyond about 2010 you should completely
  2229. 1:20:03re-qualify or re-certify
  2230. 1:20:05the shuttle that'd be very expensive
  2231. 1:20:07proposition
  2232. 1:20:08not funded we suggest that we need to
  2233. 1:20:12re-establish the independent technical
  2234. 1:20:14review authority or re-establish the
  2235. 1:20:16position of
  2236. 1:20:16engineers as being independent from the
  2237. 1:20:19program so engineers can do engineering
  2238. 1:20:21work
  2239. 1:20:21independent from the program and then
  2240. 1:20:23you when you ask for an engineering
  2241. 1:20:24program
  2242. 1:20:25an engineering evaluation or an
  2243. 1:20:27engineering decision
  2244. 1:20:28you're getting an evaluation from people
  2245. 1:20:31who don't care
  2246. 1:20:32anything about this the schedule for
  2247. 1:20:34example or the
  2248. 1:20:35need to make a launch that requires
  2249. 1:20:38a a couple hundred people or a couple
  2250. 1:20:40thousand people to be
  2251. 1:20:41funded from some
  2252. 1:20:45which is currently not funded because
  2253. 1:20:47now everything is charged against one of
  2254. 1:20:48the programs
  2255. 1:20:49so budgets are a big are a big issue yes
  2256. 1:20:52ma'am
  2257. 1:20:53let me just ask administrator o'keeffe
  2258. 1:20:55in my last
  2259. 1:20:56couple of seconds he's talked about
  2260. 1:21:00the the upgrading of the shuttles
  2261. 1:21:04and the recertification of shuttles
  2262. 1:21:06which you have said
  2263. 1:21:07you're committed to to doing and
  2264. 1:21:10uh we also have the new space orbital
  2265. 1:21:13vehicle that
  2266. 1:21:17will replace the shuttle and i would
  2267. 1:21:19like to ask you
  2268. 1:21:20if you think you said you have the
  2269. 1:21:22resources to do your high priorities
  2270. 1:21:24have you taken into account the
  2271. 1:21:26upgrading of the shuttles
  2272. 1:21:28and do you have any attention of
  2273. 1:21:32speeding up the process of the space
  2274. 1:21:34orbital vehicle that would replace the
  2275. 1:21:36shuttles
  2276. 1:21:36yes ma'am two out of three of those
  2277. 1:21:39again our discussion a moment ago was on
  2278. 1:21:40the science priorities but as it
  2279. 1:21:42pertains to the three specific items
  2280. 1:21:44he's mentioned again
  2281. 1:21:46those now are findings and therefore
  2282. 1:21:47they're treated as fact
  2283. 1:21:49and the other three issues two of them
  2284. 1:21:52there are resources set aside whether
  2285. 1:21:55they're sufficient or not is something
  2286. 1:21:56we've got to evaluate
  2287. 1:21:58for the upgrading of the shuttle there
  2288. 1:22:00is a service life extension program
  2289. 1:22:02budget line item that's in the budget
  2290. 1:22:04the president presented to
  2291. 1:22:05the congress on february the third we
  2292. 1:22:07have to assess exactly what those
  2293. 1:22:09upgrades
  2294. 1:22:10are that need to comply specifically
  2295. 1:22:12with these findings
  2296. 1:22:13and whether that comports exactly or
  2297. 1:22:14whether additional resources are
  2298. 1:22:16necessary
  2299. 1:22:16is something that time will tell in the
  2300. 1:22:19second area the
  2301. 1:22:20the in terms of the independent
  2302. 1:22:22technical authority admiral gaming is
  2303. 1:22:23exactly right well that takes 200 or 2
  2304. 1:22:26000
  2305. 1:22:26additional engineers don't know yet
  2306. 1:22:28we're going to have to assess all those
  2307. 1:22:29options
  2308. 1:22:30and indeed he's right that's not
  2309. 1:22:32something we anticipated that's not
  2310. 1:22:34something that's contained in this
  2311. 1:22:35budget but we intend to do it and we'll
  2312. 1:22:37assess what those resource requirements
  2313. 1:22:38are
  2314. 1:22:39as we work our way through this um so
  2315. 1:22:42the approach with and
  2316. 1:22:43as far as the orbital space plane is
  2317. 1:22:44concerned the there is an additional
  2318. 1:22:46amount in there's amounts in the budget
  2319. 1:22:48before the congress now that was
  2320. 1:22:50proposed in
  2321. 1:22:512004 the initial funding was agreed to
  2322. 1:22:54by the congress
  2323. 1:22:56um as part of the president's uh
  2324. 1:22:58amendment in november of last year to
  2325. 1:23:00last year's budget not enough to
  2326. 1:23:02increase
  2327. 1:23:03the that's exactly right and i was just
  2328. 1:23:05about to say that you're exactly right
  2329. 1:23:06the issue of accelerating its delivery
  2330. 1:23:08is something we
  2331. 1:23:09we need to look at and the issue is not
  2332. 1:23:11so much of how much
  2333. 1:23:13more it will cost but how much more
  2334. 1:23:15resources you need earlier
  2335. 1:23:16in order to achieve that and that's
  2336. 1:23:18something we've really got to assess now
  2337. 1:23:20and make a determination uh of whether
  2338. 1:23:22that is in the best interest
  2339. 1:23:24uh overall to pursue that particular
  2340. 1:23:26approach but we're working that
  2341. 1:23:27diligently i've got some answers on
  2342. 1:23:29what it would take to accelerate this
  2343. 1:23:30for an earlier delivery
  2344. 1:23:32of whatever ultimate design uh would
  2345. 1:23:35come out of this competitive effort that
  2346. 1:23:37we're pursuing right now
  2347. 1:23:38thank you mr chairman thank you senator
  2348. 1:23:40appreciate it very much
  2349. 1:23:41thank you uh mr chairman uh let me begin
  2350. 1:23:44uh
  2351. 1:23:45administrator o'keefe with this question
  2352. 1:23:46of
  2353. 1:23:48my sense that you really can't define
  2354. 1:23:50nasa's
  2355. 1:23:52mission now without getting on top of
  2356. 1:23:54the question
  2357. 1:23:55of man's space flight and i think
  2358. 1:23:58we're about to start a whole array of
  2359. 1:24:02commissions and studies and the like and
  2360. 1:24:04i would like to ask you
  2361. 1:24:06whether you could furnish us within 90
  2362. 1:24:09days
  2363. 1:24:10or at most six months a
  2364. 1:24:13solid cost-benefit analysis
  2365. 1:24:16with respect to manned space flight
  2366. 1:24:19because
  2367. 1:24:19i think that's what the congress really
  2368. 1:24:22needs
  2369. 1:24:23and i know that what i get asked all the
  2370. 1:24:26time and certainly there are a lot of
  2371. 1:24:27critics that say look they give the bulk
  2372. 1:24:28of the money
  2373. 1:24:30to man programs but most of the research
  2374. 1:24:32seems to come from
  2375. 1:24:33areas that aren't manned what's your
  2376. 1:24:35reaction to the proposal i've made this
  2377. 1:24:37morning
  2378. 1:24:38that you give this committee a solid
  2379. 1:24:41cost-benefit analysis
  2380. 1:24:43on manned space flight within 90 days or
  2381. 1:24:46at most
  2382. 1:24:46six months it's a very intriguing idea
  2383. 1:24:49i'll give it my best shot
  2384. 1:24:50i think that's a very thoughtful way to
  2385. 1:24:53go about approaching it and i'll do my
  2386. 1:24:54very best to provide such a document
  2387. 1:24:57and an analysis that would demonstrate
  2388. 1:24:58that that's a that's a step forward i
  2389. 1:25:00think improving this two things i would
  2390. 1:25:02observe as well though that
  2391. 1:25:04uh just to get the the to be clear on
  2392. 1:25:06the facts
  2393. 1:25:07a third of the budget is really
  2394. 1:25:09dedicated towards space flight
  2395. 1:25:11activities
  2396. 1:25:12of which 25 percent is shuttle uh
  2397. 1:25:15additional amounts are for international
  2398. 1:25:17space station
  2399. 1:25:18and then the other two thirds is towards
  2400. 1:25:20earth science
  2401. 1:25:21space science all the things that are
  2402. 1:25:23not specifically related to space flight
  2403. 1:25:25activities so
  2404. 1:25:26it it already is skewed heavily towards
  2405. 1:25:30uh activities by a factor of roughly two
  2406. 1:25:31to one uh the kinds of functions that
  2407. 1:25:34are performed
  2408. 1:25:34uh by robotic and distant means
  2409. 1:25:38so that's an approach the other thing
  2410. 1:25:39we've got to really assess here
  2411. 1:25:41and again in in pursuit i think
  2412. 1:25:42earnestly to answer the question the
  2413. 1:25:44very thoughtful proposal you've put
  2414. 1:25:46forward
  2415. 1:25:46on how to conduct such an analysis we've
  2416. 1:25:49got to find some way to
  2417. 1:25:51factor in what is the cognitive skills
  2418. 1:25:54that human beings bring to the occasion
  2419. 1:25:56in these cases there are some things you
  2420. 1:25:58simply can't do without a human
  2421. 1:26:00intervention
  2422. 1:26:01and we've got to be selective in the
  2423. 1:26:02cases in which
  2424. 1:26:04we expose humans to those risks
  2425. 1:26:08and that's essentially what i think
  2426. 1:26:09you're posing and it's a very
  2427. 1:26:11interesting way to go about doing it
  2428. 1:26:12i'll give it my best shots
  2429. 1:26:13chairman i would just like to follow up
  2430. 1:26:15with you and senator hollings i i've
  2431. 1:26:16made the proposal but
  2432. 1:26:18obviously i'd very much like to do it
  2433. 1:26:20within the bipartisan approach you
  2434. 1:26:22followed in this
  2435. 1:26:23in this committee but to me that is the
  2436. 1:26:25bottom line we have
  2437. 1:26:26got to get a cost benefit analysis with
  2438. 1:26:30respect to what is done
  2439. 1:26:31in the manned versus unmanned area and
  2440. 1:26:34i'll be following that up and look
  2441. 1:26:36forward to talking to my colleagues
  2442. 1:26:37about it second question admiral gaiman
  2443. 1:26:39if i might
  2444. 1:26:40involves the compliance issue i think
  2445. 1:26:42senator hollings touched on this
  2446. 1:26:44i mean the whole history here is tragedy
  2447. 1:26:47and recommendations made and then
  2448. 1:26:50somehow
  2449. 1:26:51they don't get followed i like your
  2450. 1:26:53recommendations with respect to how
  2451. 1:26:56it could be different this time and to
  2452. 1:26:58bring about compliance i mean for
  2453. 1:27:00example i mean just
  2454. 1:27:01on a kind of basic level i mean we could
  2455. 1:27:03ask administrator o'keefe to come on in
  2456. 1:27:05here every 90 days
  2457. 1:27:07and basically say look this is what
  2458. 1:27:09we've done in the last
  2459. 1:27:10you know 90 days uh i want to give you a
  2460. 1:27:13crack at
  2461. 1:27:15how you'd approach it but what i i think
  2462. 1:27:18you want to do and the dedicated people
  2463. 1:27:20who staff this effort want to do is make
  2464. 1:27:22sure we're not sitting here
  2465. 1:27:23in the face of another tragedy and your
  2466. 1:27:25thoughts with respect on how to make
  2467. 1:27:26sure
  2468. 1:27:27that there's compliance this time i
  2469. 1:27:29think would be another area i'm
  2470. 1:27:31interested in
  2471. 1:27:31thank you senator as i indicated my
  2472. 1:27:33opening remarks uh
  2473. 1:27:34i agree with your concern and and as i
  2474. 1:27:37said in our opening remarks
  2475. 1:27:39i think we owe it we owe it to the
  2476. 1:27:41memory of the
  2477. 1:27:42seven heroes who died to make sure that
  2478. 1:27:44we do everything we can to
  2479. 1:27:46to prevent this accident from happening
  2480. 1:27:48again
  2481. 1:27:49the history of nasa which we studied
  2482. 1:27:52very carefully in our
  2483. 1:27:54and documented in our report indicates
  2484. 1:27:56that
  2485. 1:27:58that nasa like any other big bureaucracy
  2486. 1:28:01responds to the forces that are acting
  2487. 1:28:03on it and unfortunately over a period of
  2488. 1:28:05long long period of time budget
  2489. 1:28:09schedule cost forces became very
  2490. 1:28:12important
  2491. 1:28:12to nasa and they started to they started
  2492. 1:28:14to affect the program
  2493. 1:28:16the question about how to prevent this
  2494. 1:28:17from happening again is a is a very
  2495. 1:28:19intriguing one
  2496. 1:28:21the board has spent some time scratching
  2497. 1:28:23their heads about it
  2498. 1:28:26a couple we have a couple of examples
  2499. 1:28:27that have worked well in the past
  2500. 1:28:29in the case of the challenger accident
  2501. 1:28:30you may recall that the rogers
  2502. 1:28:32commission
  2503. 1:28:33required that nasa redesigned the uh
  2504. 1:28:36solid rocket booster joints
  2505. 1:28:38and and o-rings it wasn't just the
  2506. 1:28:40o-rings it was the whole joint
  2507. 1:28:42and they also recommended that an
  2508. 1:28:44oversight committee be established to
  2509. 1:28:46supervise that a non-nasa oversight
  2510. 1:28:49committee
  2511. 1:28:50and that oversight committee was in
  2512. 1:28:51existence for for almost three years
  2513. 1:28:54and they disapprove the first couple of
  2514. 1:28:57nasa redesign efforts
  2515. 1:28:59uh you could appoint some kind of a
  2516. 1:29:02of a panel or a committee uh to advise
  2517. 1:29:05the congress
  2518. 1:29:06as to whether or not these management uh
  2519. 1:29:10and and uh step steps have been taken
  2520. 1:29:13and whether or not they're really
  2521. 1:29:14working and
  2522. 1:29:15and all that sort of stuff there is a
  2523. 1:29:17precedent for that
  2524. 1:29:19there is uh and i think the members of
  2525. 1:29:22this committee are very much
  2526. 1:29:23aware there is a congressionally
  2527. 1:29:25appointed
  2528. 1:29:26or congressionally created oversight
  2529. 1:29:29panel already in existence called the
  2530. 1:29:31asap
  2531. 1:29:32aerospace safety advisory panel created
  2532. 1:29:34by congress
  2533. 1:29:36you might want to charge them with some
  2534. 1:29:38duties and responsibilities or maybe
  2535. 1:29:40reformat them reformulate the membership
  2536. 1:29:44to get at the issues that you're
  2537. 1:29:45concerned about uh
  2538. 1:29:47admiral if i if i might because i know
  2539. 1:29:49i'm just about to run out of time i want
  2540. 1:29:52your opinion on one other area
  2541. 1:29:54the technical engineering authority that
  2542. 1:29:57you
  2543. 1:29:58have talked about strikes me as a way
  2544. 1:30:02to bring about some of the independence
  2545. 1:30:04and oversight that's important i would
  2546. 1:30:06like to hear
  2547. 1:30:07your thoughts on sort of the nuts and
  2548. 1:30:09bolts of how that would work and also
  2549. 1:30:12yours administrator o'keefe whether you
  2550. 1:30:14accept the recommendation
  2551. 1:30:16and in effect how something like this
  2552. 1:30:18would work i mean the the first thing
  2553. 1:30:19that strikes me is if
  2554. 1:30:20nasa puts up the money for it then you
  2555. 1:30:23say to yourself how does that
  2556. 1:30:25facilitate the kind of independence that
  2557. 1:30:27you're talking about
  2558. 1:30:28but given the fact that you put great
  2559. 1:30:30weight on this technical engineering
  2560. 1:30:32authority tell us
  2561. 1:30:34how you think it would work and i'd like
  2562. 1:30:37both of your reactions
  2563. 1:30:38i know my light is on but i'd like the
  2564. 1:30:40reaction of both you gentlemen on that
  2565. 1:30:43senator uh thank you for that question
  2566. 1:30:45that question probably gets to the
  2567. 1:30:47most important recommendation and
  2568. 1:30:50probably the core
  2569. 1:30:51of our of our report and that is that
  2570. 1:30:55we have found that over the years that
  2571. 1:30:58a legitimate system of checks and
  2572. 1:31:01balances
  2573. 1:31:02has been lost in nasa in which there are
  2574. 1:31:05independent and resourceful and robust
  2575. 1:31:08agencies that kind of check up on each
  2576. 1:31:10other within within nasa
  2577. 1:31:12we don't the board does not feel that we
  2578. 1:31:14need to create another entity or an
  2579. 1:31:16anti-nasa or something like that
  2580. 1:31:19but what's happened is this this
  2581. 1:31:21independent robust
  2582. 1:31:22system of checks and balances has been
  2583. 1:31:24lost and it's been lost
  2584. 1:31:26in the name of efficiency and
  2585. 1:31:27effectiveness and all that kind of stuff
  2586. 1:31:29but nevertheless it's been lost
  2587. 1:31:32and the manifestations of that are
  2588. 1:31:34really what our report is all about
  2589. 1:31:36all the emails that didn't get acted on
  2590. 1:31:39and the
  2591. 1:31:40and the uh the the inability of
  2592. 1:31:42engineers to affect
  2593. 1:31:44things and the overwhelming power of
  2594. 1:31:46informal chains of command by people in
  2595. 1:31:48the program and things like that
  2596. 1:31:50all those things are fixed if you create
  2597. 1:31:54an engineering world in which engineers
  2598. 1:31:56can have a robust
  2599. 1:31:58and honest difference of opinion and use
  2600. 1:32:01and you don't do management by view
  2601. 1:32:02graphs you use technical papers instead
  2602. 1:32:04of
  2603. 1:32:05view graphs and overheads and all those
  2604. 1:32:07bad things we talked about
  2605. 1:32:09what this what this organization would
  2606. 1:32:11do what we think the
  2607. 1:32:12key ingredient to the success of this
  2608. 1:32:16scheme
  2609. 1:32:17is that this organization must in fact
  2610. 1:32:20own a function by that i mean simply
  2611. 1:32:24creating an organization that sits
  2612. 1:32:26on the sideline in and uh kibbutz's or
  2613. 1:32:30or second guesses other people is not
  2614. 1:32:32good enough
  2615. 1:32:33these our suggestion is that this
  2616. 1:32:35organization actually has to own part of
  2617. 1:32:37the process
  2618. 1:32:38in the part of the process we suggest is
  2619. 1:32:41that they have to own the technical
  2620. 1:32:42requirements and specifications
  2621. 1:32:44and all waivers to them now that implies
  2622. 1:32:48that they have to understand those
  2623. 1:32:49technical requirements and
  2624. 1:32:50specifications i have to understand why
  2625. 1:32:52they're there
  2626. 1:32:54if anybody wants a waiver to them they
  2627. 1:32:55have to understand the rationale for the
  2628. 1:32:57waiver
  2629. 1:32:58and if they don't want to grant the
  2630. 1:32:59waiver they have to understand why
  2631. 1:33:00they're not granting it
  2632. 1:33:01so that's that suggests an engineering
  2633. 1:33:04enterprise of some size
  2634. 1:33:06um uh it used to be that way long long
  2635. 1:33:09time ago
  2636. 1:33:10and that really gets to the core that
  2637. 1:33:12really gets the core of our
  2638. 1:33:13recommendation because
  2639. 1:33:15many half 60 percent of all the ills
  2640. 1:33:18that we list in our report are
  2641. 1:33:20immediately fixed because of
  2642. 1:33:22of of this enterprise that we recommend
  2643. 1:33:25it can be within nasa we
  2644. 1:33:27we don't necessarily suggest it has to
  2645. 1:33:28be outside of nasa
  2646. 1:33:32i'm sorry the request was that i respond
  2647. 1:33:36as well
  2648. 1:33:36the short answer is
  2649. 1:33:39it's a finding and therefore it's a fact
  2650. 1:33:42it's a recommendation so therefore we're
  2651. 1:33:44going to comply with it
  2652. 1:33:45no further debate on that issue and what
  2653. 1:33:47admiral gaiman and his colleagues on the
  2654. 1:33:49board have pointed to
  2655. 1:33:51is a organizational characteristic that
  2656. 1:33:53i recognized from my
  2657. 1:33:55defense department experience years ago
  2658. 1:33:57particularly the navy department
  2659. 1:33:58experience which is to have a
  2660. 1:34:00severability between
  2661. 1:34:01that institutional force which owns and
  2662. 1:34:04and
  2663. 1:34:05kind of takes control of specifications
  2664. 1:34:07and engineering
  2665. 1:34:08requirements and those that are faced
  2666. 1:34:11with the
  2667. 1:34:12program operational considerations of
  2668. 1:34:15cost and schedule and
  2669. 1:34:16all the other factors go into the day in
  2670. 1:34:19and day out kinds of work
  2671. 1:34:20and make a very clear severability of
  2672. 1:34:22those functions got the message
  2673. 1:34:24that's a clear recommendation we're
  2674. 1:34:25going to sort through the options of
  2675. 1:34:27what is the best approach to do it
  2676. 1:34:29and again the oversight function that we
  2677. 1:34:32have
  2678. 1:34:33uh put in motion is the stafford covey
  2679. 1:34:35team of tom stafford and dick covey and
  2680. 1:34:37his 25
  2681. 1:34:38their 25 colleagues in all these
  2682. 1:34:41different disciplines of management
  2683. 1:34:42engineering technical change
  2684. 1:34:44organization change
  2685. 1:34:46culture change all those different
  2686. 1:34:47experts will then be
  2687. 1:34:49the judge of whether we've picked the
  2688. 1:34:51appropriate option to do that
  2689. 1:34:53and we will not proceed until such time
  2690. 1:34:55as we're satisfied
  2691. 1:34:56that we have selected an option that is
  2692. 1:34:58not only compliant
  2693. 1:34:59but really does follow through on the
  2694. 1:35:01the point that's being raised here
  2695. 1:35:03final observation is i i concur
  2696. 1:35:05wholeheartedly in admiral gaiman's view
  2697. 1:35:07that there is a statutory board in place
  2698. 1:35:09right now the congress
  2699. 1:35:11enacted 30 years ago after the apollo
  2700. 1:35:13fire
  2701. 1:35:14the asap the panel that is focused on
  2702. 1:35:17these
  2703. 1:35:17you know safety objectives i think the
  2704. 1:35:19charge that i'm hearing here
  2705. 1:35:21and as well as the approach that needed
  2706. 1:35:22taken is take that statutory oversight
  2707. 1:35:25function
  2708. 1:35:26and reinvigorate it and we'll we'll have
  2709. 1:35:29to kind of concentrate on
  2710. 1:35:30what the right ways are to do that and
  2711. 1:35:32certainly would appreciate your support
  2712. 1:35:34and help in that pursuit as well
  2713. 1:35:36senator brownback thank you mr chairman
  2714. 1:35:38thank you gentlemen for being here today
  2715. 1:35:40uh admiral gaiman in the report it's
  2716. 1:35:43replete about there's a need for a
  2717. 1:35:44change of culture
  2718. 1:35:46and i think there was one news account
  2719. 1:35:47that put it accurately that
  2720. 1:35:49technology is easy people are difficult
  2721. 1:35:53how do you how do you change a culture
  2722. 1:35:55at an institution
  2723. 1:35:57without changing the people involved
  2724. 1:36:00and this seems to me that if you're
  2725. 1:36:03talking about a
  2726. 1:36:04cultural issue here you're not talking
  2727. 1:36:07about moving boxes or organizational
  2728. 1:36:09charts around you're talking about
  2729. 1:36:11changing hold mentalities and whole
  2730. 1:36:13attitudes
  2731. 1:36:14and that seems to me that you're you are
  2732. 1:36:18talking about
  2733. 1:36:19major wholesale changes in personnel
  2734. 1:36:22within the nasa system is that accurate
  2735. 1:36:26senator we we anguished over this issue
  2736. 1:36:30for a considerable amount of time
  2737. 1:36:32and we also did not we did not start our
  2738. 1:36:35investigation
  2739. 1:36:36with this with this position we kind of
  2740. 1:36:39came to it
  2741. 1:36:40and i think that in order to answer your
  2742. 1:36:42question directly i have to
  2743. 1:36:44i have to make it clear that the board
  2744. 1:36:48made a clear distinction between
  2745. 1:36:50management
  2746. 1:36:52problems and management fixes and
  2747. 1:36:55culture
  2748. 1:36:55we in our minds in our framework we view
  2749. 1:36:58these two things as two separate things
  2750. 1:37:01management can easily be fixed by wiring
  2751. 1:37:03diagrams and changing rules and
  2752. 1:37:05regulations
  2753. 1:37:06and moving people around and changing
  2754. 1:37:07functions and and all that stuff
  2755. 1:37:09but the cultural issues are more
  2756. 1:37:11difficult to get at
  2757. 1:37:12much more difficult that we had a little
  2758. 1:37:15saying that you can
  2759. 1:37:16you can fix a management problem by
  2760. 1:37:17reorganizing but you can't fix a
  2761. 1:37:19cultural problem by reorganizing
  2762. 1:37:21cultural problems are going to have to
  2763. 1:37:22be driven bad culture there's good
  2764. 1:37:25culture too by the way there's a culture
  2765. 1:37:26of safety and a culture of honesty and a
  2766. 1:37:28culture of openness and all those kinds
  2767. 1:37:30of things
  2768. 1:37:30which needs to be reinforced but bad
  2769. 1:37:33cultural traits which we tried to
  2770. 1:37:35list specifically in our report so we
  2771. 1:37:37weren't just waving our arms and beating
  2772. 1:37:39our breasts here
  2773. 1:37:41need to be driven out of the system by
  2774. 1:37:42active proactive leadership
  2775. 1:37:45and not just leadership from the
  2776. 1:37:46administrator he can't do it alone it's
  2777. 1:37:48going to take
  2778. 1:37:50he can affect probably two levels below
  2779. 1:37:52him and then the people below him can
  2780. 1:37:53affect two levels below them but
  2781. 1:37:55it's going to have to take active
  2782. 1:37:57leadership on
  2783. 1:37:58on behalf of several layers of
  2784. 1:38:00management in order to get at this
  2785. 1:38:02problem and it can't be done in a few
  2786. 1:38:04days or a few months
  2787. 1:38:05and therefore we did not make it a
  2788. 1:38:06return to flight a return to flight
  2789. 1:38:08thing
  2790. 1:38:09uh let me because my times will be
  2791. 1:38:11limited on this
  2792. 1:38:13don't isn't what you're describing
  2793. 1:38:14though that you're going to have to make
  2794. 1:38:16major personnel changes to
  2795. 1:38:18change those attitudes uh culture you
  2796. 1:38:20you can
  2797. 1:38:21up and down through the organization uh
  2798. 1:38:24my experience
  2799. 1:38:24has been that you can change the
  2800. 1:38:26behavior of people you can't change the
  2801. 1:38:28attitude of people but you can change
  2802. 1:38:29your behaviors
  2803. 1:38:30i would suggest to mr o'keefe that after
  2804. 1:38:32trying as hard as he can and repeating
  2805. 1:38:34the message over and over again if
  2806. 1:38:35there's somebody out there who doesn't
  2807. 1:38:37get it he has to be replaced
  2808. 1:38:38and quickly mr o'keefe
  2809. 1:38:42looking at the comprehensive list of
  2810. 1:38:44recommendations there in chapter 11 it's
  2811. 1:38:46it takes me back a little bit the return
  2812. 1:38:49to flight requirements are extensive
  2813. 1:38:52how long do you think those would take
  2814. 1:38:53to get implemented at what cost there
  2815. 1:38:58are 15 very specific recommendations
  2816. 1:39:00that must be implemented you're exactly
  2817. 1:39:01right
  2818. 1:39:02prior to any return to flight activity
  2819. 1:39:05and the answer is
  2820. 1:39:06it will occur when we've determined we
  2821. 1:39:08are fit to fly
  2822. 1:39:10because not just those 15 but anything
  2823. 1:39:12else we determine
  2824. 1:39:14that falls into the category of issues
  2825. 1:39:16which would otherwise
  2826. 1:39:17compromise successful mission
  2827. 1:39:20accomplishment
  2828. 1:39:22is going to have to be accomplished that
  2829. 1:39:24bar has to be that much higher it can't
  2830. 1:39:26be just those 15.
  2831. 1:39:27no time frame then you don't you don't
  2832. 1:39:29you can't establish any time frame i
  2833. 1:39:30think you've said that in other
  2834. 1:39:31interviews what about the cost
  2835. 1:39:34uh again we have to assess that because
  2836. 1:39:36it really turns on
  2837. 1:39:37which options we select to implement
  2838. 1:39:39each of those particularly those 15
  2839. 1:39:41and then all the other recommendations
  2840. 1:39:42as well and the other things we've
  2841. 1:39:44included in the in the uh
  2842. 1:39:46raise the bar kind of inputs area so as
  2843. 1:39:49we work through with the stafford covey
  2844. 1:39:51team
  2845. 1:39:51exactly what options we're going to
  2846. 1:39:53choose that will then
  2847. 1:39:54yield a price tag which will give us a
  2848. 1:39:57better
  2849. 1:39:58judgment of exactly what that's going to
  2850. 1:39:59take let me build on that if i could and
  2851. 1:40:01this is i think along line with what
  2852. 1:40:02senator wyden was saying
  2853. 1:40:04as you appraise that there's going to be
  2854. 1:40:06a cost associated with that i i
  2855. 1:40:08hope you also look at it and question
  2856. 1:40:10whether it would be just
  2857. 1:40:11a better thing to invest in a different
  2858. 1:40:13technology
  2859. 1:40:15if at some point we look at that sooner
  2860. 1:40:18rather than later maybe even much sooner
  2861. 1:40:20we ground the shuttle and go to a
  2862. 1:40:21different system if the cost of
  2863. 1:40:23implementing this
  2864. 1:40:25is is so high relative to going to a new
  2865. 1:40:28technology
  2866. 1:40:29or a new system and i i would hope that
  2867. 1:40:31as you appraise this that
  2868. 1:40:32you look at this is the amount of time
  2869. 1:40:34it would take us to get the shuttle back
  2870. 1:40:35to flight this is how much it would cost
  2871. 1:40:38are we throwing good money after bad
  2872. 1:40:41there's there's a fair
  2873. 1:40:42feeling that this is an older technology
  2874. 1:40:45it's a complex technology that we may
  2875. 1:40:47just be at a point
  2876. 1:40:48it's time to say shuttle the shovel
  2877. 1:40:53scuttle the shuttle uh and we move uh
  2878. 1:40:56move on to the next technology and i
  2879. 1:40:58hope you will be making that appraisal
  2880. 1:40:59rather than just saying well
  2881. 1:41:00we're on this line and we're gonna go go
  2882. 1:41:03that track
  2883. 1:41:04yes sir as we as you review the
  2884. 1:41:06implementation plan which again will be
  2885. 1:41:09released late this week early next and
  2886. 1:41:12you
  2887. 1:41:13that's going to continue to inform the
  2888. 1:41:14debate of what the scope and magnitude
  2889. 1:41:17of return the flight's going to require
  2890. 1:41:19i'm certain we're going to have a
  2891. 1:41:21spirited debate in terms of
  2892. 1:41:23what exactly that will entail what it'll
  2893. 1:41:25cost what the trade-offs are
  2894. 1:41:27and again we intend to be under multiple
  2895. 1:41:29levels of oversight review in that
  2896. 1:41:31process
  2897. 1:41:32when i and i can assure you congress is
  2898. 1:41:33going to be looking at that question
  2899. 1:41:35how much time what's this cost is it
  2900. 1:41:37just time to go to a new technology
  2901. 1:41:39which i have to tell you my leaning is
  2902. 1:41:41just clearly that that's the way we
  2903. 1:41:43should be going at this time
  2904. 1:41:44there's two major disasters it's a
  2905. 1:41:46complex system it's an older design
  2906. 1:41:48every year this is 30 year old design
  2907. 1:41:50that we're into now
  2908. 1:41:54the i i just can't help but think that
  2909. 1:41:56we would do much
  2910. 1:41:57better and it may also be a cultural
  2911. 1:41:59issue when you go at a new technology we
  2912. 1:42:01can bring a new team in
  2913. 1:42:03to design where we're going to next and
  2914. 1:42:06that new team will have a different
  2915. 1:42:08cultural or you're going to be able to
  2916. 1:42:09shape the attitude of that culture i
  2917. 1:42:11think cultures are critically important
  2918. 1:42:14i think it is to the country i think it
  2919. 1:42:16is to institutions i know it is in my
  2920. 1:42:18office
  2921. 1:42:19and this may be the answer to both the
  2922. 1:42:22cultural and the uh the technology
  2923. 1:42:24senator you've asked me to keep an open
  2924. 1:42:25mind i just asked that you do the same
  2925. 1:42:27as we work our way through this
  2926. 1:42:28implementation plan my plea would be
  2927. 1:42:30let's all keep an open mind in terms of
  2928. 1:42:32where the options need to go
  2929. 1:42:34that's fair enough i hope you also will
  2930. 1:42:36think about creating this presidential
  2931. 1:42:38commission on the future of space
  2932. 1:42:39exploration the congress can do that but
  2933. 1:42:41that's
  2934. 1:42:42really an executive branch function and
  2935. 1:42:44the report noted that we lack a
  2936. 1:42:46comprehensive and engaging vision
  2937. 1:42:49uh way i've been looking at seeing as
  2938. 1:42:51we're we're stuck
  2939. 1:42:52mentally in low space orbit our thinking
  2940. 1:42:55is
  2941. 1:42:56and uh i just i think you need to get
  2942. 1:42:59and i think the country wants to engage
  2943. 1:43:01in a discussion on what's our vision for
  2944. 1:43:02space it's not just
  2945. 1:43:04nasa it also involves i mean it's
  2946. 1:43:06discovering exploration but it's also
  2947. 1:43:08commercial and military to engage that
  2948. 1:43:10broader discussion of where are we going
  2949. 1:43:12as a country here because i think i
  2950. 1:43:13think the country wants to go but
  2951. 1:43:15they they need that they need that
  2952. 1:43:17vision that really unites and uh
  2953. 1:43:20and says this risk is uh
  2954. 1:43:23it's worth it this this cost is worth so
  2955. 1:43:26i hope you'll consider that
  2956. 1:43:27that uh a presidential level commission
  2957. 1:43:29to work with establishing that
  2958. 1:43:32i know there are difficulties with it
  2959. 1:43:34and there's not a simple answer but a
  2960. 1:43:36division really is a critical thing to
  2961. 1:43:38unite a country
  2962. 1:43:40i'll be cheering the hearing the rest of
  2963. 1:43:42the way uh out and uh
  2964. 1:43:44who's uh senator nelson
  2965. 1:43:47is next up sorry about that
  2966. 1:43:52thank you mr chairman
  2967. 1:43:56gentlemen everybody up here
  2968. 1:43:59wants this program to be successful
  2969. 1:44:05and so i'm going to ask some very
  2970. 1:44:08specific questions we we have heard
  2971. 1:44:12the admiral say in his excellent report
  2972. 1:44:16he has stated buying power
  2973. 1:44:20has been reduced 40 over the last 10
  2974. 1:44:24years the admiral has said here today
  2975. 1:44:27uh that money has been squeezed out of
  2976. 1:44:29the shuttle program and i'm doing exact
  2977. 1:44:31quotes from what you said admiral
  2978. 1:44:35you talked about how the program manager
  2979. 1:44:37had made trades
  2980. 1:44:39on the cost how looking ahead that you
  2981. 1:44:43should separate
  2982. 1:44:44engineering and safety from the cost and
  2983. 1:44:46schedule
  2984. 1:44:47part of the evaluation
  2985. 1:44:50and that you you talked about
  2986. 1:44:55all leaders are responsible for the
  2987. 1:44:58results
  2988. 1:44:59the administrator the white house the
  2989. 1:45:02congress
  2990. 1:45:03you specifically stated that so
  2991. 1:45:06realizing that that
  2992. 1:45:08has been part of the problem
  2993. 1:45:12in the past now i want to ask some very
  2994. 1:45:14specific questions mr administrator as
  2995. 1:45:17we go forward
  2996. 1:45:18this is not partisan the space program
  2997. 1:45:22is not partisan
  2998. 1:45:25a lot of these questions have been
  2999. 1:45:26addressed by senator hutchison
  3000. 1:45:29as well i would like to know
  3001. 1:45:34if you have had discussions
  3002. 1:45:38you or any of your immediate people
  3003. 1:45:41with the white house omb
  3004. 1:45:45is part of the white house about the
  3005. 1:45:48increased
  3006. 1:45:49expenditures that you're going to come
  3007. 1:45:52to the congress
  3008. 1:45:53to ask for we are
  3009. 1:45:57pursuing an interagency discussion
  3010. 1:46:01on the larger u.s space exploration
  3011. 1:46:04objectives
  3012. 1:46:05the result of that will yield a very
  3013. 1:46:07specific answer to your question
  3014. 1:46:09that will be manifest in a request from
  3015. 1:46:12the president
  3016. 1:46:13uh in whatever period of time that takes
  3017. 1:46:15it's a request for supplemental that
  3018. 1:46:17you're talking about
  3019. 1:46:18no sir i'm not specifying exactly what
  3020. 1:46:20form it will take whether it's an
  3021. 1:46:22amendment or a supplemental or part of a
  3022. 1:46:23regular budget request
  3023. 1:46:25all that's being vetted now well as the
  3024. 1:46:28admiral said
  3025. 1:46:29the leadership problems involved
  3026. 1:46:32everybody is in the past
  3027. 1:46:34so if we're going to fix
  3028. 1:46:37this problem the congress
  3029. 1:46:40is going to have to help you and the
  3030. 1:46:43white house fix the problem
  3031. 1:46:44so we're going to need to know how much
  3032. 1:46:48we're going to have to help you to fix
  3033. 1:46:50the problem so
  3034. 1:46:52can you give us any kind of idea what
  3035. 1:46:54we're talking about because right now
  3036. 1:46:56decisions are being made in the uh
  3037. 1:46:58appropriation subcommittee on the o4
  3038. 1:47:00budget
  3039. 1:47:01indeed and that process is underway and
  3040. 1:47:04as soon as we can get an answer that's
  3041. 1:47:06that's precisely what i have an
  3042. 1:47:08obligation to come back to you and your
  3043. 1:47:09colleagues to deliver
  3044. 1:47:10yes sir okay you said you had ongoing
  3045. 1:47:12discussions have you had
  3046. 1:47:14ongoing discussions in the range of a
  3047. 1:47:16billion and a half dollars
  3048. 1:47:18of return to fight flight additional
  3049. 1:47:20monies we've had ongoing discussions i
  3050. 1:47:23really don't want to get into the what
  3051. 1:47:24what the current state of play is or
  3052. 1:47:26what the numbers might be
  3053. 1:47:27because they really run the gamut i
  3054. 1:47:29think again as i i mentioned
  3055. 1:47:31in response to senator brownback's
  3056. 1:47:34commentary
  3057. 1:47:35the cost of this is going to depend on
  3058. 1:47:36which options we choose there are 29
  3059. 1:47:38recommendations
  3060. 1:47:40and a whole range of raise the bar
  3061. 1:47:44objectives we're going to have to do so
  3062. 1:47:45each of those options going to have a
  3063. 1:47:47price tag
  3064. 1:47:47and the answer to that very specific
  3065. 1:47:49question will come from
  3066. 1:47:51the total of how much it takes on the
  3067. 1:47:54options you select for all 29 of those
  3068. 1:47:56and every other issue contained in the
  3069. 1:47:59raise the bar inputs that are equally
  3070. 1:48:02important in our judgment
  3071. 1:48:03so i can't give an answer to that until
  3072. 1:48:05we can do that math
  3073. 1:48:07mr administrator you have heard me be
  3074. 1:48:10very critical
  3075. 1:48:11of past administrations
  3076. 1:48:14both parties uh on the way
  3077. 1:48:18that they use budgetary sleight of hand
  3078. 1:48:21uh uh over the years
  3079. 1:48:25to get us into the fiscal condition that
  3080. 1:48:28we are finding where
  3081. 1:48:29nasa has not given the specific money
  3082. 1:48:34directed at safety you've heard me talk
  3083. 1:48:38about how
  3084. 1:48:40the space shuttle budget and the
  3085. 1:48:43space station budget were lumped
  3086. 1:48:45together back in the 90s
  3087. 1:48:48and then money was transferred around
  3088. 1:48:52now it is very much the responsibility
  3089. 1:48:56of the congress as we look at your
  3090. 1:49:00budgets
  3091. 1:49:00to know specifically what has happened
  3092. 1:49:03now for example
  3093. 1:49:04maybe you can share this with us of
  3094. 1:49:07course as
  3095. 1:49:08admiral gaiman said not only have the
  3096. 1:49:11budgets been flat
  3097. 1:49:13with regard to the space shuttle
  3098. 1:49:17the budgets have actually in real buying
  3099. 1:49:19power has been a 40 percent drop
  3100. 1:49:21over uh 10 years and indeed
  3101. 1:49:25where i see the difference in what the
  3102. 1:49:28administration
  3103. 1:49:30has requested in 03 for the space
  3104. 1:49:34shuttle roughly
  3105. 1:49:353.2 billion dollars you would think it
  3106. 1:49:39was an increase
  3107. 1:49:39going to the 04 request of 3.9
  3108. 1:49:43but in fact the institutional account
  3109. 1:49:46which includes a lot of the
  3110. 1:49:48infrastructure that was
  3111. 1:49:501.2 billion in the past is zeroed out
  3112. 1:49:54so a number of those institutional costs
  3113. 1:49:57including things like
  3114. 1:49:58infrastructure are part of that
  3115. 1:50:02additional funding increase so where is
  3116. 1:50:05the increase in your 04 request
  3117. 1:50:09specifically gets at the problem of
  3118. 1:50:11safety and safety upgrades
  3119. 1:50:14there is a budget line item within the
  3120. 1:50:16shuttle program
  3121. 1:50:17for a service life extension program and
  3122. 1:50:20of that
  3123. 1:50:21we have to identify the prioritization
  3124. 1:50:24that's underway
  3125. 1:50:25that was started before the accident
  3126. 1:50:29to begin to work through exactly what is
  3127. 1:50:31the prioritization of selection of those
  3128. 1:50:33upgrades and their timely implementation
  3129. 1:50:36so the answer to the the question is
  3130. 1:50:38that's the funding stream that's there
  3131. 1:50:40it's not one year it's in 0-4 and each
  3132. 1:50:43successive year thereafter
  3133. 1:50:45there's a continuing funding stream that
  3134. 1:50:47follows thereafter
  3135. 1:50:48and as a consequence this is an enduring
  3136. 1:50:50program that we intend to put
  3137. 1:50:52specificity to which upgrade implemented
  3138. 1:50:55at which time based on which
  3139. 1:50:56prioritization set and again informed by
  3140. 1:50:58a lot of what we will learn
  3141. 1:51:00as we implement these findings and
  3142. 1:51:02recommendations
  3143. 1:51:04okay i see my time is up senator bro
  3144. 1:51:10thank you very much mr chairman and once
  3145. 1:51:12again
  3146. 1:51:13thank you admiral for a very fine report
  3147. 1:51:17and also thank you mr o'keefe for the
  3148. 1:51:19cooperative effort that you've shown in
  3149. 1:51:21producing this report
  3150. 1:51:22i'll just ask you with regard to the
  3151. 1:51:24lockheed martin facility and miss you
  3152. 1:51:27down in new orleans
  3153. 1:51:28what kind of cooperation did you get
  3154. 1:51:30admiral and working with them
  3155. 1:51:32and finding out what they did and and
  3156. 1:51:34everything else
  3157. 1:51:36senator we got we got outstanding
  3158. 1:51:37cooperation at michoud
  3159. 1:51:39and in particular uh we did a lot of
  3160. 1:51:42work down there
  3161. 1:51:43because we we and
  3162. 1:51:46and the workforce at michoud wanted to
  3163. 1:51:48understand the properties of foam better
  3164. 1:51:50than had been understood in the past uh
  3165. 1:51:53and therefore we we asked them how to go
  3166. 1:51:56about that and they
  3167. 1:51:57they worked right alongside us in
  3168. 1:51:59conducting devising and conducting
  3169. 1:52:01various
  3170. 1:52:01experiments and and uh certainly that
  3171. 1:52:04the
  3172. 1:52:05the best uh commentary i can get
  3173. 1:52:09i can give you is is the very
  3174. 1:52:12uh the the is the
  3175. 1:52:15the dissection of the already built
  3176. 1:52:17bipod ramps that we did
  3177. 1:52:19uh this this showed
  3178. 1:52:23some problems inside those bipod ramps
  3179. 1:52:25that were unknown
  3180. 1:52:26beforehand and it took considerable
  3181. 1:52:28amount of courage on those
  3182. 1:52:30people to to help us do that did the
  3183. 1:52:33separating of the foam from the external
  3184. 1:52:35fuel tanks become an acceptable risk of
  3185. 1:52:38nasa it it the categorization
  3186. 1:52:41of separation of foam
  3187. 1:52:45changed over the years it migrated from
  3188. 1:52:47a very very serious category
  3189. 1:52:50to a category that was not so serious
  3190. 1:52:53until it absolutely disappeared off the
  3191. 1:52:54radar scope altogether
  3192. 1:52:56and and yet it was the same it was the
  3193. 1:52:58same physical event
  3194. 1:53:00and that is a that's a mistake it seems
  3195. 1:53:03to me
  3196. 1:53:03that we've had the separation of the
  3197. 1:53:07foam
  3198. 1:53:08from the very beginning that we've had
  3199. 1:53:11separation of foam the first
  3200. 1:53:13known incident was back in 1983.
  3201. 1:53:16the most recent incident other than this
  3202. 1:53:19tragic accident was
  3203. 1:53:21only three months before this final
  3204. 1:53:23accident
  3205. 1:53:24and your report points out that photos
  3206. 1:53:26exist of foam
  3207. 1:53:28separating for 65 of the 79 missions
  3208. 1:53:32for which we had imaging that was
  3209. 1:53:34available
  3210. 1:53:35and then the own oh the regulations
  3211. 1:53:39of nasa on external tank debris limits
  3212. 1:53:43said very clearly that no debris shall
  3213. 1:53:46emanate
  3214. 1:53:47from the critical zone of the external
  3215. 1:53:49tank on the launch pad
  3216. 1:53:51or drilling ascent except for such
  3217. 1:53:54material which may result from normal
  3218. 1:53:56thermal protection systems recession
  3219. 1:53:59due to ascent heating
  3220. 1:54:02so we've had foam separation from the
  3221. 1:54:05very beginning
  3222. 1:54:07throughout numerous launches 65 of 75
  3223. 1:54:11that we saw
  3224. 1:54:11pictures of and as recent as three
  3225. 1:54:14months before this incident
  3226. 1:54:16plus a regulation of nasa itself that
  3227. 1:54:19says no
  3228. 1:54:20debris separation is acceptable and
  3229. 1:54:22should be allowed
  3230. 1:54:25and yet we were still launching
  3231. 1:54:28shuttle missions knowing that this was
  3232. 1:54:31continuing
  3233. 1:54:32knowing that we had a regulation that
  3234. 1:54:34said don't allow this to happen
  3235. 1:54:36to me that seems like a monumental
  3236. 1:54:38breakdown
  3237. 1:54:40can you comment on that yes sir and and
  3238. 1:54:43it's it gets to the core of our
  3239. 1:54:44recommendation to have an independent
  3240. 1:54:46technical
  3241. 1:54:47authority uh the the adjudication of
  3242. 1:54:51whether or not
  3243. 1:54:52the foam anomaly should be treated as a
  3244. 1:54:55show stopper or not
  3245. 1:54:56is uh is made by a board a board of
  3246. 1:55:00of engineers and managers at the space
  3247. 1:55:02shuttle program office
  3248. 1:55:04and the chairman of that board is the
  3249. 1:55:05space shuttle program manager
  3250. 1:55:08so what we have is a case where the
  3251. 1:55:10program manager who has
  3252. 1:55:12pressures on him for cost and schedule
  3253. 1:55:14and manifests and
  3254. 1:55:16lots lots of other things having to
  3255. 1:55:18determine
  3256. 1:55:19whether or not this anomaly which is now
  3257. 1:55:21before the board for adjudication
  3258. 1:55:23whether or not he should make a big
  3259. 1:55:25administrative deal out of this or
  3260. 1:55:26make a small deal out of it he knows
  3261. 1:55:29that if he makes a big deal out of it it
  3262. 1:55:30might jeopardize or slow down
  3263. 1:55:33future launches he also knows that if he
  3264. 1:55:35doesn't understand why this is happening
  3265. 1:55:37it'll cost a couple million dollars to
  3266. 1:55:39do some research and development a
  3267. 1:55:40couple million dollars that he doesn't
  3268. 1:55:41have
  3269. 1:55:42find out why foam is doing this and what
  3270. 1:55:44are the properties of it and how to fix
  3271. 1:55:46it and so this this one person who's got
  3272. 1:55:48all these pressures on him is making
  3273. 1:55:49these decisions and we found that to be
  3274. 1:55:51not
  3275. 1:55:51not a good system i'm not sure how an
  3276. 1:55:54outside board is going to help you
  3277. 1:55:55on on this particular
  3278. 1:55:59degree of investigation or supervision
  3279. 1:56:03because we already knew it was happening
  3280. 1:56:06we have a rule that says no debris shall
  3281. 1:56:08separate
  3282. 1:56:08or shed and we have numeral
  3283. 1:56:12instances of launches where this was
  3284. 1:56:15occurring
  3285. 1:56:17it was despite a rule that said don't
  3286. 1:56:18let it happen it was happening and we
  3287. 1:56:20were continuing to launch vehicles
  3288. 1:56:21knowing it was happening and outside
  3289. 1:56:22board's going to tell us the same thing
  3290. 1:56:24we already know
  3291. 1:56:25mr o'keefe was it a matter of cost
  3292. 1:56:28i mean we have a regulation that says it
  3293. 1:56:30should not happen
  3294. 1:56:32it was happening and we were still
  3295. 1:56:34launching knowing that it was happening
  3296. 1:56:36as much as three months before this
  3297. 1:56:38launch is the reason that we was allowed
  3298. 1:56:41to continue
  3299. 1:56:42a cost reason or was it simply people
  3300. 1:56:45ignoring the regulations and ignoring
  3301. 1:56:47what was happening
  3302. 1:56:49i don't discount anything that admiral
  3303. 1:56:51gaiman has offered here is again i think
  3304. 1:56:52there's a those are all contributing
  3305. 1:56:54factors but i think there are two
  3306. 1:56:55overriding reasons why this happened
  3307. 1:56:59first one is we the rule that you cite
  3308. 1:57:02properly exactly
  3309. 1:57:03very precisely that we set is viewed
  3310. 1:57:06in the agency and within the shuttle
  3311. 1:57:09program as a
  3312. 1:57:10goal here's why a goal not a requirement
  3313. 1:57:13not a hard fast
  3314. 1:57:15specification and that's a fool's errand
  3315. 1:57:17heading down the road
  3316. 1:57:18towards saying well we'd like to achieve
  3317. 1:57:20this because that means we regularly
  3318. 1:57:22rationalize
  3319. 1:57:23why we would waive something we view as
  3320. 1:57:26a goal
  3321. 1:57:26not as a requirement as a specification
  3322. 1:57:28and that's a big mistake
  3323. 1:57:30so we've really got to look back so
  3324. 1:57:31that's the first issue is we really have
  3325. 1:57:33to make that rule
  3326. 1:57:34as firm as you just described it to have
  3327. 1:57:37folks understand what is what is it
  3328. 1:57:38that's in
  3329. 1:57:39in violet that you simply cannot uh
  3330. 1:57:42transcend
  3331. 1:57:43and where are those cases in which
  3332. 1:57:45there's a desired objective that we have
  3333. 1:57:46to continue to achieve and find a way to
  3334. 1:57:48get there
  3335. 1:57:49or else simply define this as a goal
  3336. 1:57:51that's not achievable the second case is
  3337. 1:57:53what we're dealing with here is human
  3338. 1:57:54nature
  3339. 1:57:57it is like everything else in life when
  3340. 1:57:59you see something repetitively
  3341. 1:58:02it begins to fuel a rationalization of
  3342. 1:58:05why that's not a problem
  3343. 1:58:07that's the cultural problem yes sir and
  3344. 1:58:09it's it it is it is among the two issues
  3345. 1:58:11a more i mean they go hand in hand but i
  3346. 1:58:13think they have to be viewed compatibly
  3347. 1:58:15and that human tendency we shouldn't be
  3348. 1:58:18surprised to see in engineers when we
  3349. 1:58:19see it in everyday life
  3350. 1:58:22we all know anytime you walk down a
  3351. 1:58:24metropolitan
  3352. 1:58:25street anytime there is a homeless
  3353. 1:58:29person sitting inside of a doorway
  3354. 1:58:32there are some number of people who are
  3355. 1:58:34stunned by the fact that people walk by
  3356. 1:58:36with
  3357. 1:58:36absolutely no cognizance of the fact
  3358. 1:58:39that's going on
  3359. 1:58:40and have ignored it
  3360. 1:58:43if we were for if anybody came from a
  3361. 1:58:46south pacific paradise island and walk
  3362. 1:58:48down that same street they'd be aghast
  3363. 1:58:50at seeing how humanity is being treated
  3364. 1:58:52and would be amazed by how it is we as a
  3365. 1:58:55people could tolerate that
  3366. 1:58:57and so it's that first occasion in which
  3367. 1:58:59you see it that raises that interest
  3368. 1:59:01level
  3369. 1:59:02we shouldn't be surprised when engineers
  3370. 1:59:04act just like the rest of people do
  3371. 1:59:06when they see something repetitively
  3372. 1:59:08they begin to rationalize
  3373. 1:59:10and begin to look at things and assume
  3374. 1:59:12what it is they think they know about it
  3375. 1:59:14and in every other instance and here's
  3376. 1:59:16the big mistake and admiral gaiman and
  3377. 1:59:17the board
  3378. 1:59:18pointed to this very very clearly this
  3379. 1:59:20human nature said
  3380. 1:59:22if nothing happened previously it
  3381. 1:59:24probably won't happen again in the
  3382. 1:59:25future
  3383. 1:59:25that's the wrong direction it ought to
  3384. 1:59:27go in the opposite approach
  3385. 1:59:29which they have said repetitively in
  3386. 1:59:31this report which is we've got to prove
  3387. 1:59:33that it's safe
  3388. 1:59:34not prove that it's not and that's a
  3389. 1:59:36point that really has to be driven home
  3390. 1:59:38and as a consequence we really have to
  3391. 1:59:39take that same mindset
  3392. 1:59:41and understand that while this is a
  3393. 1:59:42human nature human characteristic
  3394. 1:59:45that when we see things repetitively
  3395. 1:59:48that we take it for granted
  3396. 1:59:49or begin to make assumptions or whatever
  3397. 1:59:51else it simply can't be tolerated here
  3398. 1:59:54because the stakes are too high well we
  3399. 1:59:57all know what happens when we assume
  3400. 1:59:59yes sir and we do it in every discipline
  3401. 2:00:03every single discipline in every walk of
  3402. 2:00:05life there are assumptions that are
  3403. 2:00:07considered to be in violent and we've
  3404. 2:00:08got to go back and question what those
  3405. 2:00:10assumptions are
  3406. 2:00:11that's a real tough order and it's one
  3407. 2:00:13that's going to take us a lot of time
  3408. 2:00:14and discipline
  3409. 2:00:18admiral gaiman and administrator o'keefe
  3410. 2:00:20thank you for your testimony this
  3411. 2:00:22morning
  3412. 2:00:23i was thinking as i was sitting here
  3413. 2:00:25having read recently about the december
  3414. 2:00:2717th
  3415. 2:00:271903 59 second flight by the wright
  3416. 2:00:31brothers at kitty hawk
  3417. 2:00:33and in the 100 years since we have had
  3418. 2:00:37all manners of tragedy and exhilaration
  3419. 2:00:40and success and
  3420. 2:00:42especially the space program it seems to
  3421. 2:00:44me is the one aspect of
  3422. 2:00:46going from leaving the ground to walking
  3423. 2:00:49on the moon
  3424. 2:00:50the one aspect of walking on the edge of
  3425. 2:00:52the envelope of technology
  3426. 2:00:54and science and one would expect that
  3427. 2:00:56there will always be
  3428. 2:00:58those who who suffer the consequences of
  3429. 2:01:02tragedy in those circumstances but
  3430. 2:01:06these tragedies that have occurred this
  3431. 2:01:08one especially and the investigation you
  3432. 2:01:10have
  3433. 2:01:11uh completed tells uh tell us that there
  3434. 2:01:14are certain things that
  3435. 2:01:15that can and should and must be done to
  3436. 2:01:17prevent
  3437. 2:01:18this from happening again i mean the
  3438. 2:01:20fact that we're dealing on the edge of
  3439. 2:01:21the envelope in science and technology
  3440. 2:01:23does not in any way excuse
  3441. 2:01:24tragedies that could have been prevented
  3442. 2:01:26and those heroes as you
  3443. 2:01:28described them and this our country
  3444. 2:01:30understands them to be in
  3445. 2:01:32that space in the space shuttle uh uh
  3446. 2:01:35should expect should have expected then
  3447. 2:01:37and certainly the future astronauts
  3448. 2:01:39should expect everything
  3449. 2:01:40possible is being done to provide for
  3450. 2:01:43their safety
  3451. 2:01:44i want to ask you just about two issues
  3452. 2:01:47quickly and
  3453. 2:01:47let me say first of all admiral gaiman i
  3454. 2:01:50i'm not a scientist or
  3455. 2:01:52i don't have the technical ability
  3456. 2:01:54perhaps to have fully digested
  3457. 2:01:56everything that your report
  3458. 2:01:58includes but it seems to me you have
  3459. 2:02:00done a massively thorough job
  3460. 2:02:02and administrator o'keefe you have i
  3461. 2:02:05think
  3462. 2:02:06been a very stand-up administrator here
  3463. 2:02:08in these circumstances
  3464. 2:02:09i raised questions immediately about the
  3465. 2:02:13proposition of whether nasa could create
  3466. 2:02:16its own investigative board reporting to
  3467. 2:02:19nasa
  3468. 2:02:19others raise the same questions you
  3469. 2:02:21responded immediately by
  3470. 2:02:23changing the board's charter removing
  3471. 2:02:25references the requirement that the
  3472. 2:02:27nasa oversee and review the board's
  3473. 2:02:29investigation and so on i think the
  3474. 2:02:30result of that
  3475. 2:02:32administrator o'keeffe gives us a report
  3476. 2:02:34that does have true independence and i
  3477. 2:02:36think you're
  3478. 2:02:37working with it the way you have has
  3479. 2:02:38been admirable and i appreciate that
  3480. 2:02:40leadership
  3481. 2:02:41i want to ask you two things thank you
  3482. 2:02:43one the
  3483. 2:02:45the requirement
  3484. 2:02:50of the mission management team meetings
  3485. 2:02:52every day during a shuttle flight
  3486. 2:02:54those nasa regulations required such
  3487. 2:02:57meetings every day and
  3488. 2:02:58my understanding is from your report it
  3489. 2:03:00occurred those meetings occurred only
  3490. 2:03:02five times during the 16-day mission
  3491. 2:03:04and that discussions uh regarding the
  3492. 2:03:07risks of the foam strike and the need
  3493. 2:03:09for additional imagery
  3494. 2:03:10um the the
  3495. 2:03:14the requests for imagery did not surface
  3496. 2:03:16at all at these
  3497. 2:03:17meetings that were held so 15 of these
  3498. 2:03:20or 16 these meetings should have been
  3499. 2:03:21held i guess
  3500. 2:03:23and uh five of them were held and at the
  3501. 2:03:25five that were held
  3502. 2:03:27no discussions were developed in those
  3503. 2:03:29meetings with respect to the
  3504. 2:03:31request for imagery despite the fact
  3505. 2:03:33that beneath
  3506. 2:03:34all of that these discussions were
  3507. 2:03:36occurring
  3508. 2:03:37can you describe that perhaps both of
  3509. 2:03:40you describe that for me
  3510. 2:03:41is that part of the culture issue or
  3511. 2:03:43part of the assumption issue that never
  3512. 2:03:45came to the attention of those who
  3513. 2:03:46should have been attending to it
  3514. 2:03:48if i'll start off by saying that uh
  3515. 2:03:52the characterization is is correct that
  3516. 2:03:54you made they held five mmt meetings in
  3517. 2:03:56the 16 day
  3518. 2:03:57in the 16 day flight they're required to
  3519. 2:03:59meet every day we went back to the three
  3520. 2:04:01previous missions
  3521. 2:04:03and counted up the number of times the
  3522. 2:04:05mmt met
  3523. 2:04:06and guess what they don't meet every day
  3524. 2:04:08they've been meeting every third day
  3525. 2:04:10for as long back as we could find
  3526. 2:04:11records and and
  3527. 2:04:13this is this is an example of culture at
  3528. 2:04:17work
  3529. 2:04:17what happens is you got a regulations
  3530. 2:04:19you got to do it this way
  3531. 2:04:20uh over a period of years and years and
  3532. 2:04:22years you kind of atrophy to where you
  3533. 2:04:24do it this way you're violating your own
  3534. 2:04:26rules and regulations
  3535. 2:04:28and now you're sending all kinds of
  3536. 2:04:29informal messages through the system
  3537. 2:04:31that it's okay to violate your rules and
  3538. 2:04:33regulations and the top
  3539. 2:04:35level managers are doing it we don't
  3540. 2:04:37need to meet every day we can meet every
  3541. 2:04:39third day it's good enough
  3542. 2:04:40uh emails are good enough and we're not
  3543. 2:04:44sure
  3544. 2:04:44what emails count for i mean is our
  3545. 2:04:46emails official communications or not
  3546. 2:04:48and so
  3547. 2:04:49and so this is this is a classic case so
  3548. 2:04:52i wouldn't blame
  3549. 2:04:53the fact that there were only five
  3550. 2:04:55meetings on this mission
  3551. 2:04:57as being causative in other words that's
  3552. 2:04:59the way they've been doing it for years
  3553. 2:05:00so there's nothing different about it
  3554. 2:05:03now
  3555. 2:05:04now we we made we made the point in our
  3556. 2:05:06report that these meetings were very
  3557. 2:05:08short that someone were 30 minutes long
  3558. 2:05:10longest one was about 50 minutes long
  3559. 2:05:12and if they had really had met every day
  3560. 2:05:14maybe they would have inquired into some
  3561. 2:05:16of the more minute details of what was
  3562. 2:05:18going on in the subject of imagery might
  3563. 2:05:20have come up
  3564. 2:05:22pure speculation
  3565. 2:05:26this report very clearly indicates that
  3566. 2:05:29the rules and regulations that we have
  3567. 2:05:31promulgated over the years
  3568. 2:05:32are treated much the same way as
  3569. 2:05:34stoplights in naples
  3570. 2:05:35their advisory that's not
  3571. 2:05:39tolerable we cannot have that
  3572. 2:05:42we've got to go back and really look at
  3573. 2:05:44what those operational procedures call
  3574. 2:05:46for and put in motion
  3575. 2:05:48that which we believe and that's part of
  3576. 2:05:50the the recommendations
  3577. 2:05:52that's part of our raise the bar input
  3578. 2:05:54standards that we really have to
  3579. 2:05:55implement
  3580. 2:05:56and have a very clear understanding
  3581. 2:05:59of how those operational rules will be
  3582. 2:06:02promulgated
  3583. 2:06:03and followed as we go through this
  3584. 2:06:05because the intent behind the mmt
  3585. 2:06:07i think is a good one which is to
  3586. 2:06:08coordinate views and positions
  3587. 2:06:11inputs and then serve it up for decision
  3588. 2:06:14making
  3589. 2:06:15well there was an awful lot of stray
  3590. 2:06:17voltage is what this report indicates
  3591. 2:06:20of lots of communication going on but to
  3592. 2:06:22no particular point
  3593. 2:06:23in some cases or to no particular
  3594. 2:06:26decision-making alternative
  3595. 2:06:28that's a failure really to understand
  3596. 2:06:30the purpose of the rules and over time i
  3597. 2:06:32think as
  3598. 2:06:33as the chairman of the board uh observe
  3599. 2:06:36as well as all of his members
  3600. 2:06:37that over time if these things are
  3601. 2:06:39viewed as advisory what's the point
  3602. 2:06:41why are they there and that's something
  3603. 2:06:43we've really got to take back as a
  3604. 2:06:44strong
  3605. 2:06:45indictment of the culture and we've got
  3606. 2:06:46to correct it and administrator o'keefe
  3607. 2:06:48the
  3608. 2:06:49reason i asked this specific question is
  3609. 2:06:51the mission management team meetings
  3610. 2:06:53i don't know much about this at all
  3611. 2:06:55except that my assumption would be that
  3612. 2:06:57mission management means just what it
  3613. 2:06:59sounds like
  3614. 2:07:01managing the entire mission and the fact
  3615. 2:07:03that it didn't meet
  3616. 2:07:04not only in this shuttle flight per
  3617. 2:07:06regulation every day but in other
  3618. 2:07:08shuttle flights as well
  3619. 2:07:09but more than that the fact that when it
  3620. 2:07:11did meet it did not have the information
  3621. 2:07:13flowing up to it
  3622. 2:07:15of questions being raised in the
  3623. 2:07:17organization about
  3624. 2:07:18the question of whether they should have
  3625. 2:07:20additional imagery to determine
  3626. 2:07:21whether this foam had caused some damage
  3627. 2:07:24to the wing
  3628. 2:07:25i mean that that's an organizational
  3629. 2:07:27issue it seems to me
  3630. 2:07:28a structural issue of very significant
  3631. 2:07:31importance to to the future operations
  3632. 2:07:34of nasa and
  3633. 2:07:35it's an important process question that
  3634. 2:07:37must be resolved no question
  3635. 2:07:38and i i wanted to ask just briefly a
  3636. 2:07:41question about the
  3637. 2:07:43next generation launch vehicle the
  3638. 2:07:45return to flight for
  3639. 2:07:47this shuttle one hopes will occur at
  3640. 2:07:50some point when we have satisfied all of
  3641. 2:07:52these issues and there's there's much
  3642. 2:07:53work to be done
  3643. 2:07:54but my understanding is that the next
  3644. 2:07:56generation launch vehicle is meant to
  3645. 2:07:58complement rather than replace the
  3646. 2:08:00shuttle
  3647. 2:08:00and as i read the investigative report
  3648. 2:08:03uh what
  3649. 2:08:04what you are saying admiral gaiman is
  3650. 2:08:06that this shuttle vehicle is yesterday's
  3651. 2:08:08technology
  3652. 2:08:10it needs to be replaced rather than uh
  3653. 2:08:13to have some other vehicle complimented
  3654. 2:08:15at some point
  3655. 2:08:16can and this gets back to i think the
  3656. 2:08:18question that
  3657. 2:08:19my colleague senator nelson was asking
  3658. 2:08:21as well i mean all of that costs an
  3659. 2:08:22enormous amount of money replacing
  3660. 2:08:24this launch vehicle completely will be a
  3661. 2:08:27significant
  3662. 2:08:28capital requirement will it not uh when
  3663. 2:08:31we go back to
  3664. 2:08:32return to flight with the space shuttle
  3665. 2:08:36uh will you by that time have made a
  3666. 2:08:38decision about what your next generation
  3667. 2:08:40launch vehicle is going to be and
  3668. 2:08:41whether it's going to fully replace it
  3669. 2:08:43in a certain time period or whether
  3670. 2:08:44you're going to continue to try to
  3671. 2:08:45complement it as your current
  3672. 2:08:47plans would would indicate yes sir now
  3673. 2:08:49the short answer is yes indeed by the
  3674. 2:08:51time we return to flight we really have
  3675. 2:08:53to have an answer to those questions
  3676. 2:08:54we're in the process right now
  3677. 2:08:56very hard of trying to resolve precisely
  3678. 2:08:58what the composition of this will be
  3679. 2:09:01using is the baseline the the integrates
  3680. 2:09:03based transportation plan that we have
  3681. 2:09:05presented to the congress
  3682. 2:09:06as part of this year's budget and was
  3683. 2:09:08endorsed last year as part of the
  3684. 2:09:09president's amendment in november
  3685. 2:09:11i'd ask admiral gaiman to comment though
  3686. 2:09:13on the the characterization of this
  3687. 2:09:15particular finding because i read it a
  3688. 2:09:16little differently
  3689. 2:09:18uh and so rather than have us go through
  3690. 2:09:21mutual interpretations here
  3691. 2:09:22let's ask the oracle to render exactly
  3692. 2:09:25what was the intent behind the words
  3693. 2:09:26that are used here in terms of
  3694. 2:09:28chapter nine and where we should be
  3695. 2:09:30going the uh
  3696. 2:09:32after we'd studied this uh system uh
  3697. 2:09:35in such great detail the board felt that
  3698. 2:09:37we owed it
  3699. 2:09:38to the public and to the united states
  3700. 2:09:40into the nation
  3701. 2:09:41to editorialize a little bit on the on
  3702. 2:09:44the safety and
  3703. 2:09:45the longevity in the lifespan of the
  3704. 2:09:47shuttle as as we know it
  3705. 2:09:48uh in chapter nine week we opine that
  3706. 2:09:52the board was surprised and disappointed
  3707. 2:09:54to find ourselves at tooth out here we
  3708. 2:09:56are
  3709. 2:09:562003 and we don't even have a
  3710. 2:09:59replacement vehicle
  3711. 2:10:01on the drawing boards i mean we're still
  3712. 2:10:02debating uh
  3713. 2:10:04we're having a debate about the
  3714. 2:10:05replacement vehicle the board
  3715. 2:10:08the board found that the shuttle is not
  3716. 2:10:11inherently unsafe
  3717. 2:10:12it can be operated for another another
  3718. 2:10:17number of years if the recommendations
  3719. 2:10:19of this
  3720. 2:10:20board are are followed through on but
  3721. 2:10:23the board finds that
  3722. 2:10:26operating it for another 20 years or
  3723. 2:10:29something is beyond our
  3724. 2:10:30beyond the scope of our imaginations and
  3725. 2:10:33that uh
  3726. 2:10:34sometime uh in a period of something
  3727. 2:10:37like 10 years from now if you're going
  3728. 2:10:39to operate it more than about 10 years
  3729. 2:10:41you have to
  3730. 2:10:41fully recertify and fully re-qualify the
  3731. 2:10:43vehicle which would be extraordinarily
  3732. 2:10:45expensive
  3733. 2:10:47from what i understand your answer to be
  3734. 2:10:49you
  3735. 2:10:51if you were an astronaut and if the
  3736. 2:10:53recommendations of the board were
  3737. 2:10:54followed you would not have
  3738. 2:10:56difficulty joining the crew and flying
  3739. 2:10:58the shuttle and that's absolutely
  3740. 2:10:59correct
  3741. 2:11:00you would flight yourself that's correct
  3742. 2:11:02i expect you won't get the opportunity
  3743. 2:11:03unless i asked
  3744. 2:11:09fortunately that was not a finding in
  3745. 2:11:10recommendation which we intend to accept
  3746. 2:11:13and comply with so as a consequence this
  3747. 2:11:15is a debatable point and i think he
  3748. 2:11:17wants to
  3749. 2:11:18head back to his sailboat well
  3750. 2:11:21this is obviously deadly serious
  3751. 2:11:23business and and
  3752. 2:11:24the work you have done has been long and
  3753. 2:11:26labored and but i think you've you've
  3754. 2:11:28accomplished
  3755. 2:11:29much with it and i think that the
  3756. 2:11:31chairman has done a real service for
  3757. 2:11:33this committee in the
  3758. 2:11:34and for the senate in calling this
  3759. 2:11:36hearing today at this time and
  3760. 2:11:38you've done some significant benefit i
  3761. 2:11:40think for this country in its space
  3762. 2:11:42program and your testimony and the work
  3763. 2:11:44you've done prior to it
  3764. 2:11:45let me just make one final comment and
  3765. 2:11:47say that i i
  3766. 2:11:49i come from north dakota i mean i don't
  3767. 2:11:51have i don't have a
  3768. 2:11:52space launch pad in the middle of my
  3769. 2:11:54state i as
  3770. 2:11:55does florida texas i but but i really
  3771. 2:11:58believe a society that stops exploring
  3772. 2:12:00stops progressing
  3773. 2:12:02i think space exploration has been very
  3774. 2:12:04important for this country i wanted to
  3775. 2:12:06succeed i wanted to continue i think the
  3776. 2:12:08benefits are very substantial
  3777. 2:12:10but it will only succeed and continue if
  3778. 2:12:13if we understand that these tragedies
  3779. 2:12:16require an enormous amount of work
  3780. 2:12:19to understand what has happened and
  3781. 2:12:20prevent it from happening again
  3782. 2:12:22again we're operating on the edge of the
  3783. 2:12:24envelope of knowledge here
  3784. 2:12:26and and some wonderful men and women
  3785. 2:12:28heroes in my judgment
  3786. 2:12:29one of whom served with us here in the
  3787. 2:12:31senate senator glenn
  3788. 2:12:32uh have uh have been the pioneers in
  3789. 2:12:35space travel but i
  3790. 2:12:36i really think we're just at the
  3791. 2:12:37beginning phase of understanding
  3792. 2:12:39what the rest of our universe is and and
  3793. 2:12:42how to explore it and the benefits it
  3794. 2:12:44can provide for us so
  3795. 2:12:45let me again thank the chairman who had
  3796. 2:12:47to depart
  3797. 2:12:48um all right and senator nelson has a
  3798. 2:12:52final question and then he will close
  3799. 2:12:53out the hearings
  3800. 2:12:54if i could just quickly observe on your
  3801. 2:12:56point i i think you've got it
  3802. 2:12:57spot on i mean we are really in the
  3803. 2:12:59equivalency here in space exploration
  3804. 2:13:01of the age of sale we have really just
  3805. 2:13:04gotten started as
  3806. 2:13:05a as a as humankind has pursued this
  3807. 2:13:08approach it is very early in this
  3808. 2:13:10process
  3809. 2:13:11and we've got a long way to go in the
  3810. 2:13:13expanse to what we
  3811. 2:13:14could conquer by this really is uh just
  3812. 2:13:18unimaginable in its expanse and so as a
  3813. 2:13:21consequence i think
  3814. 2:13:22exactly the way you've characterized
  3815. 2:13:23this is precisely the way i look at it
  3816. 2:13:25this is a
  3817. 2:13:26daunting challenge and we're very at the
  3818. 2:13:28very beginning of it
  3819. 2:13:30it's a tremendous responsibility is one
  3820. 2:13:32we take very seriously thank you very
  3821. 2:13:33much senator nelson thank you sir
  3822. 2:13:35senator dorgan i want to pick up on your
  3823. 2:13:38question
  3824. 2:13:38about the next generation vehicle
  3825. 2:13:43uh mr o'keefe you and i have talked many
  3826. 2:13:46times both privately
  3827. 2:13:48and publicly about
  3828. 2:13:51uh how you could get some more money
  3829. 2:13:55with regard to this next generation
  3830. 2:13:57vehicle
  3831. 2:13:59and one of the things we have discussed
  3832. 2:14:02is
  3833. 2:14:03that other agencies of the federal
  3834. 2:14:05government
  3835. 2:14:06could share in the expense of developing
  3836. 2:14:09the technologies that nasa
  3837. 2:14:12would oversee the research and
  3838. 2:14:13development
  3839. 2:14:15because those technologies would be of
  3840. 2:14:17value to other agencies
  3841. 2:14:20would you share with the committee
  3842. 2:14:23what is happening there
  3843. 2:14:26from a financial perspective in the
  3844. 2:14:28future
  3845. 2:14:30well uh the current ongoing effort we
  3846. 2:14:33have underway for example
  3847. 2:14:35on the x-37 technology demonstrator
  3848. 2:14:38is a good example of the kind of
  3849. 2:14:41arrangement
  3850. 2:14:42in which there are advantages that may
  3851. 2:14:45be derived for multiple
  3852. 2:14:48purposes and so as a consequence nasa
  3853. 2:14:50and the defense department
  3854. 2:14:52air force particularly are really
  3855. 2:14:54examining exactly
  3856. 2:14:55where that approach is going we are
  3857. 2:14:58uh financing with them
  3858. 2:15:01the uh overall expense related to
  3859. 2:15:05um the launch and test
  3860. 2:15:08phase of that particular technology
  3861. 2:15:10demonstrator
  3862. 2:15:12the orbital space plane which is again
  3863. 2:15:14the follow-on effort that
  3864. 2:15:15senator dorgan referred to we are right
  3865. 2:15:18now in the process
  3866. 2:15:19of inviting the industry to respond to
  3867. 2:15:22the
  3868. 2:15:23requirements which again can be
  3869. 2:15:25summarized in one page
  3870. 2:15:27this is what we want it to do and here
  3871. 2:15:28are the capabilities we need
  3872. 2:15:30and there are a number of different
  3873. 2:15:31technologies that are
  3874. 2:15:33accented if you will that may have great
  3875. 2:15:36application
  3876. 2:15:37for where the defense department may go
  3877. 2:15:39on that and we are engaging in
  3878. 2:15:40discussions with them but at this
  3879. 2:15:42present time
  3880. 2:15:43on the orbital space plane the objective
  3881. 2:15:44is that we get about the process of
  3882. 2:15:47finding
  3883. 2:15:48a complementary asset that is crew
  3884. 2:15:51transfer of vehicle in its orientation
  3885. 2:15:53that the board observed in chapter nine
  3886. 2:15:56is the kind of thing we need to do
  3887. 2:15:58as expeditiously as possible and we're
  3888. 2:15:59now in the process of trying to figure
  3889. 2:16:01out
  3890. 2:16:02how do you define expeditious how
  3891. 2:16:03quickly can it be done what's it going
  3892. 2:16:04to look like
  3893. 2:16:06and the industry is actively playing in
  3894. 2:16:08that and working through
  3895. 2:16:09that particular contractual effort
  3896. 2:16:11that's being engaged right now
  3897. 2:16:13so we should have an answer that in very
  3898. 2:16:14short order do you expect
  3899. 2:16:16that in a net outflow of dollars from
  3900. 2:16:19nasa that that will require additional
  3901. 2:16:22money to be budgeted in nasa
  3902. 2:16:25uh it heavily depends on uh
  3903. 2:16:29how soon we want to see delivery of the
  3904. 2:16:31asset and as i mentioned
  3905. 2:16:32uh in response to senator hudson's
  3906. 2:16:34comment uh the amount that we have
  3907. 2:16:37included
  3908. 2:16:38in the the nasa budget now before the
  3909. 2:16:40congress
  3910. 2:16:41and the five-year stream certainly is a
  3911. 2:16:44resource
  3912. 2:16:44allocation for an orbital space plane
  3913. 2:16:48it will not be sufficient to cover
  3914. 2:16:52any delivery date we may desire to the
  3915. 2:16:54extent we want to accelerate that
  3916. 2:16:56it isn't going to require more in
  3917. 2:16:58aggregate it may require more
  3918. 2:17:00up front and that's part of what we've
  3919. 2:17:02got to sort through now but
  3920. 2:17:04again very thoughtful questions
  3921. 2:17:06commentary
  3922. 2:17:07and direction that you've given us at
  3923. 2:17:09previous hearings and along with other
  3924. 2:17:11of your colleagues prompted us to go
  3925. 2:17:13back and look at that trade study figure
  3926. 2:17:15out what it's going to take in order to
  3927. 2:17:16accelerate this
  3928. 2:17:17what are the the approaches we would use
  3929. 2:17:19in that regard and in no instance
  3930. 2:17:22have we made the requirements negotiable
  3931. 2:17:24we've made those the fixed constant
  3932. 2:17:26and everything else around it the
  3933. 2:17:28variables we may want to consider in
  3934. 2:17:30terms of accelerating its
  3935. 2:17:32delivery or whatever approach you'd use
  3936. 2:17:34for crew transfer versus crew rescue
  3937. 2:17:36and the like in what time frame so that
  3938. 2:17:40we can be expecting it would you expect
  3939. 2:17:42to come
  3940. 2:17:42to the congress for that kind of request
  3941. 2:17:46uh to the extent that a request is
  3942. 2:17:47required it will be at the point in
  3943. 2:17:49which the president determines that
  3944. 2:17:51that's necessary
  3945. 2:17:52and that's exactly when it'll be
  3946. 2:17:53delivered and is your answer the
  3947. 2:17:56same then with regard to the additional
  3948. 2:17:59expenses that will be required for the
  3949. 2:18:01return to
  3950. 2:18:02flight um again those are those are more
  3951. 2:18:06dependent
  3952. 2:18:06and i've i've got to serve up to
  3953. 2:18:10i think all within our administration
  3954. 2:18:13a clear understanding of the options we
  3955. 2:18:16choose for the 29 recommendations
  3956. 2:18:18and the raise the bar inputs that are
  3957. 2:18:20going to be equally important
  3958. 2:18:22and make a determination of how much we
  3959. 2:18:24need in order to implement
  3960. 2:18:26the options we've chosen and that is
  3961. 2:18:29going to again
  3962. 2:18:30be a fulsome debate within the
  3963. 2:18:32administration and we're in the midst of
  3964. 2:18:33that
  3965. 2:18:34now all right i will just merely close
  3966. 2:18:37out
  3967. 2:18:38my comments and the considerable
  3968. 2:18:42fine hearing that we've had and thank
  3969. 2:18:44you all both
  3970. 2:18:46by saying
  3971. 2:18:50you've read the gaming report the gaming
  3972. 2:18:54report
  3973. 2:18:54said that the cost cutting in the past
  3974. 2:18:58has been part of the problem that's what
  3975. 2:19:00i said i was pleasantly surprised
  3976. 2:19:04in seeing in the report because i didn't
  3977. 2:19:06anticipate that admiral gaiman's
  3978. 2:19:08board was going to address uh cost
  3979. 2:19:13it is part of the problem and they have
  3980. 2:19:16identified it
  3981. 2:19:17and the long and short of it is over
  3982. 2:19:19four administrations and this is
  3983. 2:19:21bipartisan
  3984. 2:19:23both parties that
  3985. 2:19:27nasa has been
  3986. 2:19:30to use my word starved
  3987. 2:19:34of funds and it has
  3988. 2:19:37always been that office of management in
  3989. 2:19:40the budget
  3990. 2:19:42that has said nyet to nasa
  3991. 2:19:48i think everybody inc
  3992. 2:19:52including the members of this committee
  3993. 2:19:54that want as senator dorgan so
  3994. 2:19:57eloquently said to see our space program
  3995. 2:20:00continue to be robust and fulfill that
  3996. 2:20:03desire
  3997. 2:20:04of this nation to explore
  3998. 2:20:08needs to know that you're going to be in
  3999. 2:20:10there
  4000. 2:20:12fighting in the internal fights in the
  4001. 2:20:14administration with omb
  4002. 2:20:16in the white house to make sure that the
  4003. 2:20:18monies are there
  4004. 2:20:20for nasa yes sir
  4005. 2:20:25that answer is good enough for me thank
  4006. 2:20:28you sir
  4007. 2:20:30admiral gaiman again you've done a great
  4008. 2:20:32service to the country
  4009. 2:20:34an enormous service we thank you from
  4010. 2:20:37the bottom of our heart
  4011. 2:20:39no other questions from the committee
  4012. 2:20:42the committee is adjourned
  4013. 2:20:43thank you
  4014. 2:21:10okay
  4015. 2:21:24cheers
  4016. 2:21:38hello
  4017. 2:21:42i love it
  4018. 2:22:06okay
  4019. 2:22:20um
  4020. 2:22:48oh
  4021. 2:23:00in a moment ken starr and floyd abrams
  4022. 2:23:02on campaign finance
  4023. 2:23:04mexican president vicente fox and a
  4024. 2:23:06hearing on college football and
  4025. 2:23:08anti-trust issues
  4026. 2:23:18on tomorrow's washington journal guests
  4027. 2:23:20listed on your screen will discuss
  4028. 2:23:22u.s policy towards iran

About this transcript

This page contains the full transcript of Columbia Accident Report Hearing, Senate Science Committee, September 3, 2003 by Space SPAN (Space Policy and News), generated from the public captions YouTube serves with the video. The transcript has 22,367 words across 4,028 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.