  1. 0:01All right, let's get to the case. Just
  2. 0:03before we start with the case question,
  3. 0:06remember to
  4. 0:07follow the four steps from the four step
  5. 0:10approach strictly here. I'll tell you
  6. 0:12when to stop to
  7. 0:15craft your answer for each one of the
  8. 0:17four steps so you're not lost, but
  9. 0:19follow them strictly so that you
  10. 0:20practice the form, right? This is what
  11. 0:22we want to get right now. It doesn't
  12. 0:24matter if you get the case right or
  13. 0:26wrong, it matters that you get the four
  14. 0:29steps incorporated into your
  15. 0:31problem-solving techniques so that when
  16. 0:33you get an an analysis in your case,
  17. 0:36doesn't matter if it's similar to this
  18. 0:38one or if it's different, you can solve
  19. 0:41it. You can apply the four steps and
  20. 0:44separate structuring from asking
  21. 0:46questions from calculating from giving
  22. 0:49insights and leading from them so that
  23. 0:51you can actually solve the question
  24. 0:52correctly and impress your interviewer.
  25. 0:54All right. So, about to go into
  26. 0:57interviewer mode. So, most of the time
  27. 1:00I'll be speaking as I would to an
  28. 1:02interviewer. Sometimes here or there I
  29. 1:04might make a comment and it'll be clear
  30. 1:07to you that it's a comment for you.
  31. 1:09And of course, I'm going to slow down
  32. 1:12the math. You're probably going to go
  33. 1:13faster than myself, but I want to make
  34. 1:15sure that I don't miss anyone while
  35. 1:17doing the math and that you can
  36. 1:20go back to the math and compare yours if
  37. 1:22there's anything different and figure
  38. 1:24out if it's your mistake or if it's my
  39. 1:25mistake. Could be. Okay?
  40. 1:28Now, let's go on to the case question.
  41. 1:32It seems like my client is a French
  42. 1:34manufacturer of drink flavoring
  43. 1:36chemicals. So, I assume B2B. We're
  44. 1:39selling this to
  45. 1:41whoever manufactures consumer drinks,
  46. 1:43which are inputs to several consumer
  47. 1:45drinks. They manufacture and distribute
  48. 1:48their products in three different
  49. 1:49formats: powder, paste, and puree.
  50. 1:51The client is a family business known
  51. 1:53for its product's high quality and the
  52. 1:55owner is planning to retire soon. He
  53. 1:58does not have any children and plans on
  54. 1:59selling the company in 5 years. Your
  55. 2:02firm has been hired to help the client
  56. 2:04maximize the value of the company when
  57. 2:06selling.
  58. 2:07You got a table with several of the
  59. 2:09company's costs and concluded that the
  60. 2:10best area to focus right now would be on
  61. 2:13saving costs with raw materials. Your
  62. 2:15team divided the work fronts and you
  63. 2:17were designed with finding new
  64. 2:19strawberry suppliers and here's some of
  65. 2:21the data you found. Okay, so basically
  66. 2:24this guy wants to sell the company hired
  67. 2:25us to maximize value.
  68. 2:27What one of the ways that we're doing
  69. 2:29this is saving costs.
  70. 2:31Since I got a table and concluded that
  71. 2:33the best area to focus is raw materials,
  72. 2:35it seems like this is not the first
  73. 2:37question of the case, which makes sense
  74. 2:39as an analysis question usually in the
  75. 2:41middle of the case. All right. Now,
  76. 2:44they want to know how much we could save
  77. 2:46in costs by switching from the French
  78. 2:48supplier to the foreign one and they've
  79. 2:50given me this table with
  80. 2:53uh cost per ton of strawberry for the
  81. 2:55French supplier, for the foreign
  82. 2:56supplier, import costs, which is
  83. 3:00apparently 8% fee, logistics costs and
  84. 3:02losses in factories. Okay. Now, I'm
  85. 3:05asking the interviewer this,
  86. 3:07"Would it be okay if I just took a
  87. 3:09minute to structure my thoughts and
  88. 3:11figure out how I'm going to go about
  89. 3:12solving this case?" And let's say the
  90. 3:14interviewer says this is fine. Now is
  91. 3:16the moment when you should pause the
  92. 3:17video, structure your answer, present it
  93. 3:20like you would to an interviewer, so
  94. 3:22make sure you actually say it out loud
  95. 3:24so that you can listen to yourself and
  96. 3:26hear what's confusing, what's not,
  97. 3:28what's clear and how much in depth you
  98. 3:31actually went in presenting. Okay? And
  99. 3:34then,
  100. 3:35after you do this, you can unpause and
  101. 3:37listen to my answer, which I'll give
  102. 3:38right now. So,
  103. 3:40here's how I'm thinking about solving
  104. 3:42this case. Just so we're on the same
  105. 3:43page, I'm going to give you an overview
  106. 3:45of what what I want to do.
  107. 3:46I can see from the table that there are
  108. 3:48four major
  109. 3:50uh uh cost components, right? Strawberry
  110. 3:52costs, the import fee, transport costs
  111. 3:56and losses. And
  112. 3:58what I want to do is find the difference
  113. 4:01between the cost for each supplier for
  114. 4:03each one of those cost components and
  115. 4:05then add them all up. All right? And
  116. 4:08what I can see here is that strawberry
  117. 4:10cost and import fee is going to be
  118. 4:11fairly straightforward to do. Transport
  119. 4:13costs, there are a few pieces of data
  120. 4:17that are missing that I'm going to need
  121. 4:19and hopefully you have them, otherwise
  122. 4:20we can just choose some assumptions for
  123. 4:23them.
  124. 4:23And losses is going to be a little bit
  125. 4:26tricky. I have a couple of questions
  126. 4:28that I need to ask before I can actually
  127. 4:30structure how I'm going to do this cuz
  128. 4:32I'm not sure I understand the data.
  129. 4:34So, I have some questions to ask. Would
  130. 4:36it be okay if I ask those questions
  131. 4:38right now?
  132. 4:39And then let's say the interviewer says,
  133. 4:41"Yeah, that's fine. You can ask your
  134. 4:42questions."
  135. 4:43So, before you student pause your video
  136. 4:47and
  137. 4:48outline the questions you want to ask
  138. 4:49and ask them. I want to make a quick
  139. 4:51comment here. You might have noticed
  140. 4:53that part of my step one structuring
  141. 4:57will happen after
  142. 4:59my step two, which are the questions,
  143. 5:01because I need to ask a few questions
  144. 5:03before I can actually structure how I'm
  145. 5:05going to get to the losses cost
  146. 5:08difference. Okay? And that is okay. That
  147. 5:10is fine. That happens often.
  148. 5:12I already have an idea of how I'm going
  149. 5:14to do this and you should as well during
  150. 5:16structuring, but I still need to know
  151. 5:19stuff. So, part of it's going to be
  152. 5:21after the second step. All right? Now,
  153. 5:23you may pause your video,
  154. 5:25ask the questions that you need to ask
  155. 5:27and then see if they are the same that
  156. 5:30I've asked, see if you have any blind
  157. 5:31spots. All right. First question.
  158. 5:34Do we know how many tons of strawberry
  159. 5:37we purchase each year? This is a piece
  160. 5:39of data that I'm going to need. And then
  161. 5:41let's say the interviewer tells me it's
  162. 5:4210,000 tons every year that we purchase.
  163. 5:46Oh, regarding the import fee,
  164. 5:50does this fee happen over
  165. 5:53only the strawberry cost? So, it's 6%
  166. 5:57over
  167. 5:58all of my strawberry purchases, or does
  168. 6:00it include freight costs as well? And
  169. 6:03let's say the interviewer tells me,
  170. 6:04"It's only over the strawberry costs.
  171. 6:07You don't pay import fee on the
  172. 6:09transport costs."
  173. 6:10All right. Next, do we know how many
  174. 6:13trucks we use? Cuz for transport costs,
  175. 6:16I have the data of number of
  176. 6:19euros spent per kilometer per truck. So,
  177. 6:23I need to know the number of trucks and
  178. 6:24the number of kilometers per truck. And
  179. 6:26let's say the interviewer tells me that
  180. 6:29we do have data for this. We know that
  181. 6:31each truck can carry 12.5 tons of
  182. 6:34strawberry.
  183. 6:35That's okay by me. That's enough. I have
  184. 6:37the number of tons that we purchase
  185. 6:39every year. So, with that and the number
  186. 6:41of tons per truck, I can get you the
  187. 6:43number of trucks. Is that the number for
  188. 6:46both suppliers, or is it different for
  189. 6:48the new supplier? You know, let's say
  190. 6:50the interviewer tells me it's the number
  191. 6:52for both suppliers.
  192. 6:54And how about the number of kilometers
  193. 6:55per truck for each supplier? I assume
  194. 6:58that the
  195. 6:59foreign supplier is farther away. And
  196. 7:01let's say the interviewer tells me that
  197. 7:03it's
  198. 7:04100 kilometers per truck on average and
  199. 7:08250 for the foreign supplier. So, it'll
  200. 7:11be much farther away.
  201. 7:14All right. Now,
  202. 7:16my next question for losses is
  203. 7:19So, it seems like they are losses in the
  204. 7:22factory, right?
  205. 7:24So, I assume that anything that goes
  206. 7:26lost, we need to buy again, and we're
  207. 7:28probably going to have to pay import
  208. 7:29fees and transport costs on it. Yes, and
  209. 7:32that's right.
  210. 7:33Now,
  211. 7:34why do these losses happen? What's the
  212. 7:36cause of them? And let's say the
  213. 7:38interviewer says,
  214. 7:39"Oh, it's strawberries that go bad, and
  215. 7:41strawberries that come from abroad,
  216. 7:43they're a little bit lower quality, and
  217. 7:45so more of them go bad and we can't use.
  218. 7:48Okay.
  219. 7:49Now, next question.
  220. 7:51The 5% of losses in the current
  221. 7:54supplier, you said that we purchase 10
  222. 7:57tons, and I'm not sure if that's all of
  223. 7:59the tons that we use, and then we
  224. 8:01purchase more, which is the ones that we
  225. 8:03lose,
  226. 8:04or do we purchase 10,000 tons, but we
  227. 8:07also only use 9.5 thousand tons because
  228. 8:115% are losses. And let's say the
  229. 8:14interviewer tells me that this is the
  230. 8:15case. We purchase 10,000 tons, but we
  231. 8:18only use 9.5 thousand tons because
  232. 8:215% go to waste. Okay, so this is more
  233. 8:24clear to me now. I'm probably going to
  234. 8:27have to find the volume of strawberries
  235. 8:29that we use, or the weight of
  236. 8:30strawberries that we use.
  237. 8:32And given that, and how much we're going
  238. 8:35to lose, which is 9% of everything we
  239. 8:37purchase,
  240. 8:39I'm going to find out how much more
  241. 8:41we're going to have to buy. And once I
  242. 8:43find that out, I'm also going to have to
  243. 8:44account for import and transport costs.
  244. 8:48All right. Now, you may pause your video
  245. 8:50and start step three, which is, given
  246. 8:53the structure that you built, calculate
  247. 8:56the numbers. I'm going to do this as
  248. 8:58well. Going to calculate right now, so
  249. 8:59pause your video and go ahead.
  250. 9:02I'm going to start off calculating the
  251. 9:04strawberry costs, the difference in
  252. 9:06strawberry costs between each suppliers.
  253. 9:08Okay? Basically, what I'm going to do is
  254. 9:11multiply the difference in the cost
  255. 9:15euros per ton of strawberries
  256. 9:17by the number of tons that we purchase
  257. 9:19every year. So, the difference is
  258. 9:223,000 euros for the current supplier
  259. 9:25minus
  260. 9:262.2 thousand euros for the foreign
  261. 9:29supplier. So, that gives me 0.8 thousand
  262. 9:32euros
  263. 9:33per ton of strawberry.
  264. 9:36And that times 10,000 tons,
  265. 9:39.8 * 10 is 8.
  266. 9:42Thousand times thousand is million. So,
  267. 9:45I got 8 million. Okay?
  268. 9:48Now, let's move on to the import fee.
  269. 9:51What I'm going to do here is So, this is
  270. 9:53only for the foreign supplier. This is
  271. 9:55simpler. I'm going to multiply the total
  272. 9:57strawberry costs by the import fee,
  273. 10:00which is 6%. So,
  274. 10:02total strawberry costs is the price per
  275. 10:05ton of strawberries, 2.2 thousand,
  276. 10:08times the number of tons that we
  277. 10:09purchased, 10,000. So, 2.2 * 10 is 22.
  278. 10:13Thousand times thousand is million. This
  279. 10:16gives me 22 million times 6%.
  280. 10:19So, I'm going to break down
  281. 10:22uh 6% into 5% + 1%. This breakdown of
  282. 10:27percentages into simpler percentages
  283. 10:29that I know how to deal with, like 5%,
  284. 10:311%, 10%, is something that I do very
  285. 10:34often. And I recommend that you do this
  286. 10:36as well. So, uh stay tuned for it. I'm
  287. 10:38going to do it a lot, not only in this
  288. 10:40drill, but in every single other drill
  289. 10:42that you see. Just consulting interview
  290. 10:44cases always have percentages.
  291. 10:47All right. So, I'm going to break down
  292. 10:486% into 5% and 1%.
  293. 10:51Uh and then I'm going to add them up,
  294. 10:53and it's going to give me 6% of 22
  295. 10:55million. So, basically, 5% of 22
  296. 10:58million.
  297. 10:5910% of 22 million is 2.2 million. This
  298. 11:02is easy. Half of that to get to 5%, 1.1
  299. 11:06million.
  300. 11:081% of 22 million. 10% is 2.2 million.
  301. 11:1210% of that, which will bring me to 1%,
  302. 11:15is .22 million.
  303. 11:17So, I have 1.1 million plus 0.22
  304. 11:21million, 1.32
  305. 11:23million euros.
  306. 11:25Moving on to transport costs. What I'm
  307. 11:27going to do here is find the number of
  308. 11:30trucks, which I know is the same for
  309. 11:33both suppliers. And then I'm going to
  310. 11:34find the difference between the total
  311. 11:36euro amount spent per truck.
  312. 11:39Because
  313. 11:40for each supplier, there's a different
  314. 11:43cost per kilometer per truck and a
  315. 11:45different average length per truck or
  316. 11:48distance
  317. 11:49that the truck goes per truck. So,
  318. 11:53I can get to a different value of euros
  319. 11:55per truck, which puts both together. All
  320. 11:58right?
  321. 11:59So, to get to the number of trucks,
  322. 12:01I will divide the number of tons we
  323. 12:03purchase by the number of tons that go
  324. 12:06into each truck. So,
  325. 12:0810,000 divided by 12.5.
  326. 12:1112.5, I know that is half of 25, which
  327. 12:14is 1/4 of 100.
  328. 12:16So,
  329. 12:1712.5 is 1/8 of 100 or 12.5 fits eight
  330. 12:22times into 100. So,
  331. 12:26what this gives me is 12.5 equals 100
  332. 12:29over eight. So, 10,000 over 100 divided
  333. 12:32by eight is 10,000 times eight over 100.
  334. 12:38So, this gives me 800 trucks.
  335. 12:41Now, let's get to the difference in euro
  336. 12:44amount per truck spent in a year.
  337. 12:46I have that for the French supplier,
  338. 12:50we spend 10 euros per kilometer per
  339. 12:52truck and each truck goes 100
  340. 12:55kilometers. So, this gives me 1,000
  341. 12:58euros per truck.
  342. 13:00For the foreign supplier, I have 22
  343. 13:04euros per truck and 250 kilometers per
  344. 13:08truck. So,
  345. 13:10I'm going to break 22 down into 20 plus
  346. 13:1310% and I'm going to
  347. 13:16do the calculations with 20 and then I'm
  348. 13:17going to add 10% back in the end cuz 20
  349. 13:20plus 10% of 20 is 22. So, 250 * 20, this
  350. 13:25is 50 and then I'll add two zeros. This
  351. 13:28gives me 5,000. Add 10% to it, I get
  352. 13:325.5 thousand euros per truck.
  353. 13:37Okay?
  354. 13:38So, the difference between those 5.5
  355. 13:40thousand minus 1,000, 4.5 thousand euros
  356. 13:43per truck in extra costs.
  357. 13:46Now, I'm going to multiply
  358. 13:49800 trucks times the extra costs of 4.5
  359. 13:53thousand euros.
  360. 13:55What I'm going to do with this 800 is
  361. 13:56I'm going to call it 0.8 thousand cuz
  362. 13:590.8 is same as 80% and I like dealing
  363. 14:03with the zeros in letters, K, M, and B.
  364. 14:07So,
  365. 14:090.8 thousand times 4.5 thousand. As I've
  366. 14:12said before, thousand times thousand is
  367. 14:15million, so I'm going to leave the
  368. 14:16million aside.
  369. 14:18And
  370. 14:200.8 is the same as 80%, so I can just
  371. 14:23take away 20% of the other number. So,
  372. 14:264.5, 20% of that is easy to get to 0.9,
  373. 14:30right? Cuz nine is 1/5 of 45. 9 * 5 is
  374. 14:3445.
  375. 14:364.5 minus 0.9 is 3.6. So,
  376. 14:41the difference is 3.6 million euros.
  377. 14:45This is an increase in cost. Now, on to
  378. 14:47the tricky bit, losses. So,
  379. 14:50basically I'm going to do this in four
  380. 14:52steps. First, I'm going to find how many
  381. 14:54tons of strawberries I actually use
  382. 14:56every year,
  383. 14:57how much I need to purchase based on
  384. 14:59that,
  385. 15:01given the 9% losses on total purchase.
  386. 15:05Note that it's 9% losses on total
  387. 15:07purchase and not on use. So, I can't
  388. 15:10just multiply my
  389. 15:12use by 9% and add that. What I need to
  390. 15:15do is have the
  391. 15:17purchase minus 9% is
  392. 15:20the amount that I use.
  393. 15:23Now, step three is finding what increase
  394. 15:26in percentage that is versus what I used
  395. 15:29to purchase.
  396. 15:30And then I'm going to multiply that
  397. 15:32increase in percentage by the total
  398. 15:33costs. The reason I'm doing this is that
  399. 15:36I want to take into account the import
  400. 15:38and transport costs as well. Okay, let's
  401. 15:40do it. So,
  402. 15:42basically, I purchase 10,000 tons every
  403. 15:45year, but I lose 5% of that and I use
  404. 15:489.5 thousand tons. Okay?
  405. 15:52What I have here is that
  406. 15:54the amount that I purchase minus 9%
  407. 15:57gives me the amount that I use. So, I'm
  408. 15:58going to write out a little equation
  409. 16:01here.
  410. 16:02X, which is the amount I need to
  411. 16:03purchase, times 91%
  412. 16:06equals 9.5 thousand tons.
  413. 16:09So,
  414. 16:10what is X? It's 9.5 thousand tons
  415. 16:12divided by
  416. 16:14.91 or 91%.
  417. 16:18So, I'm going to divide it here. 9.5
  418. 16:21divided by .91 is the same as 950
  419. 16:25divided by 91.
  420. 16:26Uh
  421. 16:27and this gives me
  422. 16:2910.44. So, 10.44
  423. 16:33thousand. Okay? Now,
  424. 16:3610.44 thousand is a 4.4% increase over
  425. 16:42the 10,000 that we used to purchase.
  426. 16:44Now, I just need to multiply 4.4% by the
  427. 16:47total costs.
  428. 16:49All right, so let's get to the total
  429. 16:51costs.
  430. 16:52I have that
  431. 16:54the strawberry costs are 22 million.
  432. 16:56I've already calculated that.
  433. 16:58The
  434. 17:00import costs are 1.32 million. Already
  435. 17:03calculated that.
  436. 17:05And transport costs is
  437. 17:095.5 thousand. That is cost per truck
  438. 17:12times 800 trucks. Okay? And so, 5.5 * 8
  439. 17:18is 44. So, this gives me
  440. 17:224.4 million. Okay? Adding these up, 22 +
  441. 17:274.4 26.4.
  442. 17:3026.4 + 1.32
  443. 17:33gives me 27.72
  444. 17:36million. Now, I just need to calculate
  445. 17:394.4%
  446. 17:40of this.
  447. 17:42Would it be okay if I rounded this 27.72
  448. 17:48to 28 just to calculate the losses? Cuz
  449. 17:52this would make
  450. 17:54just around 1% difference in the final
  451. 17:57losses result, but it'd be so much
  452. 17:59easier for me to calculate. And let's
  453. 18:01say the interviewer says that's okay.
  454. 18:02So, I'm going to calculate 4.4%
  455. 18:05of 28 million.
  456. 18:06I'm going to break the 4.4% into
  457. 18:104%, which I'm going to break into 5%
  458. 18:13minus 1%, and then I'm going to add 10%
  459. 18:16of the 4% to itself, and it's going to
  460. 18:19give me 4.4%. So,
  461. 18:225% of 20 is 1 million. 5% of 8 is .4
  462. 18:28million. So, 5% is 1.4 million.
  463. 18:321% is
  464. 18:35.28 million. So, the 4% will be 1.4
  465. 18:39million minus .28 million. This is 1.12
  466. 18:43million.
  467. 18:44I'm going to add back 10% of this. So,
  468. 18:4710% of 1.12 is 0.112.
  469. 18:511.12 + 0.112 is 1.232.
  470. 18:57Okay? Now,
  471. 18:59let's say the interviewer tells me just
  472. 19:01round this to 1.23. Okay?
  473. 19:04Now, it's time to add up all of those
  474. 19:06cost differences, right? So, what I'm
  475. 19:08going to do is I'm going to take the
  476. 19:10cost saving from strawberry cost, and
  477. 19:12I'm going to subtract the sum of the
  478. 19:14cost increases from import costs,
  479. 19:17transport costs, and losses. So, I have
  480. 19:218 million minus the sum of 1.32,
  481. 19:253.6, and 1.23.
  482. 19:281.32 + 1.23 is 2.55. 3.6 + 2.55 is 6.15.
  483. 19:388 million minus 6.15 million is 1.85
  484. 19:43million euros. Now, I'm going to start
  485. 19:45step four, uh which is coming up with
  486. 19:49insights and next steps. And so, you
  487. 19:51should pause your video and come up with
  488. 19:53your step four if you haven't yet. Say
  489. 19:55it out loud and then listen to mine.
  490. 19:57Okay? And I would look at this number in
  491. 19:59two ways.
  492. 20:01First, if we know the
  493. 20:04total profits for this company in a
  494. 20:06year, then I could tell what percentage
  495. 20:08of profits this is. And from that,
  496. 20:11probably what the percentage of sale
  497. 20:14would value would increase because
  498. 20:16if the profits if this is 10% of profit,
  499. 20:19for example, then it's probably going to
  500. 20:21increase the sales of the sale in around
  501. 20:2410% cuz it would it would increase the
  502. 20:27free cash flow of the company in the
  503. 20:29same value.
  504. 20:30And
  505. 20:32another thing that I could do with this
  506. 20:33number, another way to look at it, is
  507. 20:35taking a valuation multiple. So, let's
  508. 20:37say the owner expects to sell this
  509. 20:40company at five times the profits. If
  510. 20:43we're saving 1.85 million, then the
  511. 20:48increase in the total value of the sale
  512. 20:49is probably going to be five times 1.85
  513. 20:53million, which is
  514. 20:55close to 10 million,
  515. 20:58around 9. Let's see. 9.25 million, I
  516. 21:02think. So,
  517. 21:04yeah, those are two ways that I'd look
  518. 21:05at it as a percentage of the value of
  519. 21:08the sale that would increase and as a
  520. 21:11total number of euros increase in sale.
  521. 21:15But, there's
  522. 21:16another thing that still leaves me wary
  523. 21:18about this number.
  524. 21:20And that is
  525. 21:21the owner intends on selling this in 5
  526. 21:23years.
  527. 21:24And there are a few things that could go
  528. 21:26wrong that I can see in this change of
  529. 21:29supplier that could be
  530. 21:32risky. So, there are revenue risks and
  531. 21:35cost risks. If any of those happen, we
  532. 21:38might actually decrease the value of the
  533. 21:40sale rather than increase. For example,
  534. 21:42on the revenue side, the the supplier
  535. 21:44could be less reliable and we could have
  536. 21:46shortages.
  537. 21:47The quality of the strawberries could
  538. 21:49affect the quality of our product and
  539. 21:51thus we could lose clients.
  540. 21:53Or there could be
  541. 21:55delays in manufacturing because we're
  542. 21:58still learning to deal with this new
  543. 22:01supplier, the times that they come, or
  544. 22:03the uh quality of the strawberries as it
  545. 22:07was mentioned that the quality is a
  546. 22:08little bit lower. Oh, if any of the any
  547. 22:10of these things happen, it'll probably
  548. 22:12offset the increase in profits from the
  549. 22:15savings in costs and actually
  550. 22:18decrease profits and of course
  551. 22:20the buyer would see that in their due
  552. 22:22diligence and they could decrease the
  553. 22:24value of the sale for that. On the cost
  554. 22:27side, we could
  555. 22:29need to have changes in manufacturing
  556. 22:31due to the low quality of the product.
  557. 22:33We might need to buy some more stuff,
  558. 22:35some kind of input that would reduce the
  559. 22:39total increase in profit that we're
  560. 22:40seeing. We could need to invest in a
  561. 22:43different type of machine because of
  562. 22:45this for some reason. Or maybe there's
  563. 22:48just a learning curve in manufacturing
  564. 22:50in whatever labor we do. And then that
  565. 22:53might increase costs for a while because
  566. 22:55it could decrease our productivity or
  567. 22:57could even
  568. 22:59decrease our output or something like
  569. 23:01that. Anything could happen. So, I would
  570. 23:03be wary. Next thing that I would do is
  571. 23:06figure out if those risks are feasible.
  572. 23:09Try to do some research on them. If I
  573. 23:11find out that these risks are not
  574. 23:13relevant, then I just go on with the
  575. 23:14change. If I find out that they are
  576. 23:17relevant, then of course I'd have to
  577. 23:19weigh this to see if we should go on
  578. 23:22with the change or not. But,
  579. 23:24if they are very large, most likely not,
  580. 23:27and then I'd move on to the next
  581. 23:29cost-saving opportunity. All right,
  582. 23:31guys. This is it for today's drill. Now,
  583. 23:34if you're advanced, you might have found
  584. 23:36this case a little bit too easy, and
  585. 23:39that's expected because
  586. 23:41I've built this module to have a skill
  587. 23:44progression.
  588. 23:45So, you want to go from easiest to
  589. 23:48hardest. But, if you want to get
  590. 23:51practice that's a little bit tougher, I
  591. 23:54recommend you do this very same drill,
  592. 23:57but not have the number of tons
  593. 24:00purchased. So, assume that in the
  594. 24:01beginning when I asked, "Do we know how
  595. 24:04many tons we purchase every year?" We
  596. 24:06don't have that answer. And what that
  597. 24:08means is that you need to find the cost
  598. 24:11decrease in percentage rather than in
  599. 24:14absolute euro value. Okay? This is just
  600. 24:18significantly tougher in the structure
  601. 24:21side, in the math side, not in the
  602. 24:24business side, of course, cuz the
  603. 24:25business is all the same, but it is
  604. 24:27going to be some good practice for you
  605. 24:29if you're advanced. Now, I want to talk
  606. 24:32about a few insights that I want you to
  607. 24:35take home from this drill because
  608. 24:37they're going to be helpful to you in so
  609. 24:40many other cases. So, first,
  610. 24:42I know that many of you like seeing
  611. 24:44alternative structures for all cases
  612. 24:46that we do. And so, I'm going to tell
  613. 24:48you that in this specific case, there is
  614. 24:51an alternative structure that would be
  615. 24:53very popular among candidates. So,
  616. 24:56basically, in this case, I did a
  617. 24:58structure that went for the
  618. 25:01difference
  619. 25:03of costs in each cost component. And
  620. 25:05then, I summed all of them up into a
  621. 25:07total of differences. You could have
  622. 25:09taken a different approach, which I will
  623. 25:11call the difference of totals. What that
  624. 25:14means is
  625. 25:15you find the entire cost we have
  626. 25:18for all cost components for one
  627. 25:20supplier, so for the French supplier,
  628. 25:22and then for the foreign supplier, and
  629. 25:24then you subtract one from the other.
  630. 25:26That's a different structure you could
  631. 25:28have done. It would have worked out the
  632. 25:30same.
  633. 25:31This is actually a quite common theme in
  634. 25:34quantitative analysis in case
  635. 25:35interviews. Cases where you can find the
  636. 25:39difference in totals, or you can add up
  637. 25:43the difference in the components of a
  638. 25:45total. That's going to happen in several
  639. 25:47different times. And most of the times
  640. 25:50you have the two possible paths to go
  641. 25:52through.
  642. 25:53And sometimes, like in this case, there
  643. 25:56isn't a clear better path.
  644. 25:59Sometimes the the path where you go
  645. 26:02straight to the difference in the
  646. 26:03components and then add them up is
  647. 26:05better because it's more efficient, but
  648. 26:08sometimes it isn't. In this case, it
  649. 26:09isn't because
  650. 26:11I had to add up all of the costs anyway
  651. 26:13to get to some of the cost components.
  652. 26:15So, it doesn't really make a difference.
  653. 26:18But, in other cases, it does make a
  654. 26:19difference. In some cases, it's just
  655. 26:21impressive if you can take the more
  656. 26:24efficient route. So, while you're
  657. 26:26practicing, I highly suggest that you
  658. 26:28look for both ways, so that you make it
  659. 26:30a habit to figure out on your own which
  660. 26:32one's the most efficient structure
  661. 26:34before starting the case. And then, once
  662. 26:37you get a case that has two different
  663. 26:39paths, two possible paths, you can even
  664. 26:43tell the interviewer, "Oh, I see these
  665. 26:45two possible paths. I'm thinking of
  666. 26:47going through this one. Do you have any
  667. 26:49preferences?" And And
  668. 26:50that gets them involved in the case.
  669. 26:52That shows them that you can discuss an
  670. 26:54analysis rather than do it on your own.
  671. 26:56It's always a good thing, okay? But,
  672. 26:58that's not the main reason why you
  673. 27:00should practice this. The main reason is
  674. 27:02so that you can find different possible
  675. 27:05structures and then pick the best one
  676. 27:07while you're doing any case.
  677. 27:09Okay, now I want to talk to you about
  678. 27:11the most common mistake in this case.
  679. 27:14And the most common mistake in this case
  680. 27:15is the following. You might have noticed
  681. 27:17that this is a fairly simple case. Once
  682. 27:21you look at the numbers that you have
  683. 27:23and what the question is,
  684. 27:25you get the feeling that you are going
  685. 27:27to be able to solve it. I highly doubt
  686. 27:28that many of you had problems and got
  687. 27:31stuck and weren't able to finish this
  688. 27:33case.
  689. 27:34Okay, and the mistake here is that once
  690. 27:37you see that, you start doing the math
  691. 27:39right away because you're nervous and
  692. 27:42you want to finish quickly or because
  693. 27:44you want to impress your interviewer
  694. 27:46that you're able to do it quickly or
  695. 27:47that you could do it right off the bat.
  696. 27:51And the truth is,
  697. 27:53you should
  698. 27:55always impress with your structure, with
  699. 27:58your communication clarity, or with the
  700. 28:00quality of your insights or next steps.
  701. 28:03You should never try to impress your
  702. 28:04interviewer on speed, and especially if
  703. 28:07that means sacrificing structure. And
  704. 28:09this is very, very common. You might be
  705. 28:11thinking, "Oh, no one would do this."
  706. 28:13This is very common, and
  707. 28:15I would not be surprised if you did it
  708. 28:17yourself, and you thought, "Oh, but I'm
  709. 28:20not going to do this in the interview."
  710. 28:21And the truth is, you are going to do in
  711. 28:23the interview exactly what you do during
  712. 28:25practice. So, you need to practice doing
  713. 28:28the steps separately.
  714. 28:29What happens if you just look at the
  715. 28:31numbers and think to yourself, "I can do
  716. 28:34this." and then you start doing it is,
  717. 28:36number one, you get the interviewer
  718. 28:37confused.
  719. 28:39They won't know where you are at all
  720. 28:41given times, and that means that if they
  721. 28:43don't understand something, they might
  722. 28:45need to assume that you're doing it
  723. 28:47wrong. That also means that if you make
  724. 28:49a mistake, you won't know where to go
  725. 28:51back to. You might need to start the
  726. 28:53case all over again, or you might even
  727. 28:55get yourself in that terrible situation
  728. 28:57where you blank out and you can't move
  729. 28:59forward or go back, and you can't really
  730. 29:02understand the help that interviewer is
  731. 29:03giving you cuz they're not sure where
  732. 29:05you are. And they're saying something,
  733. 29:06you're somewhere else, and you don't
  734. 29:08really understand it. And so, the
  735. 29:10interviewer's help starts sounding like
  736. 29:11more pressure. And
  737. 29:14even if you get everything right but
  738. 29:17doing the case without a structure, the
  739. 29:19signal that you're giving to the
  740. 29:20interviewer is not one you want to give.
  741. 29:22What you're signaling to them is that
  742. 29:25you won't be able to discuss this kind
  743. 29:27of analysis with the client because you
  744. 29:30just go and do it because you're smart
  745. 29:32and you're fast and you're going to give
  746. 29:34them a number, but you can't discuss it
  747. 29:36with the client, and that is crucial to
  748. 29:38the consulting job. What this tells the
  749. 29:40interviewer is that you have a cap in
  750. 29:43your growth inside the consulting firm.
  751. 29:45You can't be a manager. You can't be a
  752. 29:46partner because you can only do
  753. 29:49analysis, but you can't discuss them,
  754. 29:51which is absolutely necessary to getting
  755. 29:54clients and the team on board on your
  756. 29:56analysis.
  757. 29:57And also, if they see that you get it
  758. 30:00right, but they don't really understand
  759. 30:02how you got there, they can never be
  760. 30:04sure that you would have gotten it right
  761. 30:06in other cases. So, you will never get
  762. 30:08the benefit of the doubt from that
  763. 30:09interviewer. All you'll get is that
  764. 30:12he did this right, but let's say the the
  765. 30:15two interviewers are talking after your
  766. 30:17round of interviews. One of them will
  767. 30:18say, "He got this right,
  768. 30:21but I can't be sure. Like, if if this
  769. 30:24candidate got it wrong in your case,
  770. 30:25then we can't pass them." But if you do
  771. 30:28get it right in the case, and you show
  772. 30:30your structure, you convince the
  773. 30:31interviewer that you'd get it right in
  774. 30:33any case, if the other interviewer says,
  775. 30:35"Oh, this candidate didn't do it didn't
  776. 30:37do so well," they might say, "Oh, it
  777. 30:39might have been bad luck." But if you
  778. 30:40can't prove to them that you'd get it
  779. 30:42right in any case, then you're never
  780. 30:44going to get the benefit of the doubt.
  781. 30:46Now,
  782. 30:46another thing that I want to point out,
  783. 30:48and this one's from this very specific
  784. 30:50case. Notice how the interviewer didn't
  785. 30:53give me most data on transport. They
  786. 30:56only gave me a hint, which was the cost
  787. 31:00in euros per kilometer per truck. And so
  788. 31:03that's not the data that I wanted,
  789. 31:05that's not the data that I asked for,
  790. 31:06but it hinted to me that I needed the
  791. 31:08number of trucks and that I needed the
  792. 31:10number of kilometers that each truck
  793. 31:12would do in a trip. Right? And then, at
  794. 31:15that moment, I had to restructure and
  795. 31:18use that number, but ask for other
  796. 31:20numbers,
  797. 31:21uh so that I could get to my final
  798. 31:23answer.
  799. 31:24What they're doing is intentional. You
  800. 31:26are going to see that happen in so many
  801. 31:28cases, cuz they want to see
  802. 31:31that I don't get destabilized when that
  803. 31:34happens. They want to see that I can
  804. 31:35just get the number, understand where it
  805. 31:38fits, and restructure so that I can ask
  806. 31:41for the right pieces of data and do my
  807. 31:44analysis. Because this happens all the
  808. 31:46time. Like you're in a client, you're
  809. 31:48trying to do a specific certain
  810. 31:49analysis, and you figure out that the
  811. 31:51number you want doesn't exist. And then
  812. 31:53they'll tell you some other number, and
  813. 31:55if you need to go home, think about it,
  814. 31:57get yourself ready, and then go back and
  815. 31:58see if that number fits or not, then the
  816. 32:01project is going to take forever. What
  817. 32:04they want you to be able to do is once
  818. 32:06you get that number that's different
  819. 32:08than what you want, you just
  820. 32:09restructure, see where it fits, and ask
  821. 32:11for the new info that you need. Okay?
  822. 32:15And the last point that I want to point
  823. 32:17out here to you that's useful in every
  824. 32:19single case, is that there are clues
  825. 32:22from the case question and from the data
  826. 32:25that you get to what structure you want
  827. 32:28to do. All right? If you're struggling
  828. 32:29with doing analysis questions,
  829. 32:32especially
  830. 32:33structuring analysis questions,
  831. 32:36every time you get a new question,
  832. 32:37especially the tough ones, especially in
  833. 32:39practice, look at it and try to
  834. 32:41highlight what are the
  835. 32:44hints that the case question is giving
  836. 32:46you. In this case, there are many. So,
  837. 32:48each piece of data was a hint, right?
  838. 32:51They hinted in the table that I got that
  839. 32:53there were these four different cost
  840. 32:56components. And there are always these
  841. 32:59kinds of hints in case questions. So, if
  842. 33:01you just start the case before you
  843. 33:03structure, before you do anything, you
  844. 33:05highlight what those hints probably are,
  845. 33:08what look like hints to you,
  846. 33:10then you might be able to come up with
  847. 33:12the structure with the structure
  848. 33:13instinctively given that. Or at least
  849. 33:16you're going to make sure that you're
  850. 33:17not ignoring anything. Cuz once you've
  851. 33:19highlighted all the hints, you just need
  852. 33:21to make sure that every one of those is
  853. 33:24going to appear somehow in your answer.
  854. 33:26It could be in the structure, it could
  855. 33:27be in the questions that you ask, or it
  856. 33:29could be in your insights and next steps
  857. 33:32by the end of the case.
  858. 33:33All right. All right, guys, this is it
  859. 33:35for today. I'll see you in the next
  860. 33:37video.

About this transcript

This page contains the full transcript of Case Interview Fundamentals: Lesson 25 [Drill: Drink flavoring manufacturer] by CraftingCases, generated from the public captions YouTube serves with the video. The transcript has 5,538 words across 860 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to choose a caption track available on the video.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, caption language selection, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.