  1. 0:02He asked me to do a presentation on on
  2. 0:04on TransPennine. We weren't sure what
  3. 0:06what to what how to title title it. So,
  4. 0:09he went away and had a
  5. 0:10chat with Gareth Dennis, and he came up
  6. 0:12with a wonderful title I'm going to
  7. 0:13struggle to live up to,
  8. 0:15which is better layouts for a better
  9. 0:16railway. However, he did put a a
  10. 0:18commentary
  11. 0:20to accompany that. If I can get my
  12. 0:22computer to work. So, the challenges of
  13. 0:24designing TransPennine
  14. 0:26route upgrade track layouts for the
  15. 0:28Huddersfield through to Dewsbury area to
  16. 0:30enable 21st century timetable
  17. 0:33aspirations, increased capacity, and
  18. 0:35line speed increases.
  19. 0:37So, I'm actually going to touch on a
  20. 0:39slightly wider area of TransPennine, but
  21. 0:41still mostly focused on on west of
  22. 0:43Leeds.
  23. 0:46So, what what is TIU? So, TIU is the
  24. 0:50upgrading and enhancement of the route
  25. 0:52from Manchester Victoria through
  26. 0:53Stalybridge, Huddersfield, Leeds through
  27. 0:55to York.
  28. 0:57So, it's a multi-billion pound project.
  29. 1:00It's varied in size and funding levels
  30. 1:03for a period of time. It's been anything
  31. 1:06from its lowest funding level of 3
  32. 1:08billion pounds up to potentially now 11
  33. 1:10billion pounds with some additional
  34. 1:12works that we're actually taking taking
  35. 1:14to scope.
  36. 1:15So, that's
  37. 1:17um
  38. 1:18including new timetable, rolling stock,
  39. 1:20and a lot of infrastructure
  40. 1:21interventions to improve over 70 miles
  41. 1:24of route, and also
  42. 1:26another 70 70 to 80 miles of diversion
  43. 1:29route, which was has been already
  44. 1:31upgraded to facilitate diverting trains
  45. 1:33while we build the core works.
  46. 1:37So, core objectives of the project, more
  47. 1:40trains with more seats, that's mostly
  48. 1:41rolling stock requirements, faster
  49. 1:43journeys,
  50. 1:45which is journey time, so aspirations
  51. 1:46for journey time being 42 minutes
  52. 1:48between Manchester and Leeds,
  53. 1:51and 64 minutes between Manchester and
  54. 1:53York, which is roughly a 15-minute
  55. 1:56improvement on the current journey
  56. 1:58times.
  57. 1:59More reliable journeys, so that's trying
  58. 2:01to keep trains running on time, so
  59. 2:03improve performance along the route,
  60. 2:05better stations, so first and last mile,
  61. 2:08so improvements to stations themselves,
  62. 2:10not just the the trains that run on the
  63. 2:11network and stop at those stations, but
  64. 2:13the station environment, and getting
  65. 2:15even from getting from the car park to
  66. 2:17getting on the train
  67. 2:18is an important part of the program.
  68. 2:21And then a greener travel, so that is in
  69. 2:23essence electrification of the route.
  70. 2:24However, we
  71. 2:26most recent change to our remit is the
  72. 2:28inclusion of intermodal freight
  73. 2:31over the Pennines via the Diggle route
  74. 2:33because we're electrifying the route,
  75. 2:35it's not a huge step further to gauge
  76. 2:37cleared for W12.
  77. 2:39So, we've now got an additional
  78. 2:41requirement to clear the whole route,
  79. 2:43which is actually already clear as part
  80. 2:44of the works, but provide sufficient
  81. 2:45paths to also run those intermodal
  82. 2:47freight trains in addition to all the
  83. 2:49passenger trains
  84. 2:50that we're already remitted for.
  85. 2:53So,
  86. 2:54key points I'm going to
  87. 2:55touch on today, greener travel, which in
  88. 2:57essence means electrification, so I'll
  89. 2:59just talk through what we're
  90. 3:00electrifying on the route. Faster
  91. 3:01journeys are obviously line line speed
  92. 3:03increases, more trains, rolling stock,
  93. 3:07but also the capacity to run those
  94. 3:09trains, and then more reliable trains is
  95. 3:11performance and operational flexibility
  96. 3:13at various points on the route.
  97. 3:15So,
  98. 3:17greener travel. So, various parts of the
  99. 3:20north of England are electrified at
  100. 3:21different points. So, the green
  101. 3:24is what was already electrified roughly
  102. 3:2510 years ago. All the purple is the
  103. 3:27recently completed Northwest
  104. 3:28electrification project. So, everything
  105. 3:31between Manchester and Liverpool,
  106. 3:34Bolton, Wigan, and even up to Blackpool.
  107. 3:37So,
  108. 3:38and interestingly, originally Manchester
  109. 3:41Victoria to Stalybridge was also part of
  110. 3:43the NW but I'll touch on that in a
  111. 3:44moment
  112. 3:46cuz that was actually postponed and
  113. 3:48put into the TIU program. So, everything
  114. 3:50in red there is was originally the
  115. 3:52electrification proposals for TIU.
  116. 3:55Back in roughly 2018, there was a
  117. 4:00big
  118. 4:01funding challenge, we we actually
  119. 4:05de-scoped various parts of the route.
  120. 4:07Part of that, we lost part a lot of
  121. 4:08electrification.
  122. 4:10So, Andrew Jones, our
  123. 4:12transport secretary at the time, who was
  124. 4:14very keen on for some reason very keen
  125. 4:17on um
  126. 4:18partial electrification. I can't
  127. 4:20remember the correct term for it, but
  128. 4:21basically trains you you put the wires
  129. 4:24at where you get the most value for
  130. 4:25money, i.e. in this instance
  131. 4:28Huddersfield to Leeds where you've got
  132. 4:29electrified stopping services, um and
  133. 4:33Stalybridge to Manchester because of all
  134. 4:35the services in the Northwest that run
  135. 4:37through to Stalybridge. But the through
  136. 4:38trains being bi-mode trains are capable
  137. 4:40of running without the wires. So, we we
  138. 4:42lost and and created discontinuous
  139. 4:46electrification.
  140. 4:47Luckily,
  141. 4:48that was reversed. So, although we
  142. 4:50originally lost
  143. 4:52um
  144. 4:53Ashburys up to Miles
  145. 4:55Miles Platting. Can't point on my
  146. 4:57computer very well.
  147. 4:59This end, we lost the Stalybridge to
  148. 5:01Huddersfield, Leeds Leeds through to
  149. 5:03Church Fenton, and Micklefield through
  150. 5:06to Selby.
  151. 5:07Most of that has come back in with the
  152. 5:09exception of
  153. 5:10the very Manchester end to Ashburys
  154. 5:12line,
  155. 5:13Micklefield to Selby.
  156. 5:16That itself creates challenges cuz the
  157. 5:18original reason for electrifying to
  158. 5:20Selby was to allow the stopping services
  159. 5:22through Selby to an electric service. If
  160. 5:24you're trying to run stopping services
  161. 5:25in amongst fast services, you want your
  162. 5:27stopping trains to have its
  163. 5:29highest possible performance to avoid
  164. 5:31the fast trains catching them. So,
  165. 5:34it is still a shortfall on the overall
  166. 5:36remit, but we've got at least got the
  167. 5:37through route through the north of
  168. 5:38England
  169. 5:39as fully electrified.
  170. 5:42So, rolling stock.
  171. 5:45This is actually already happened. We've
  172. 5:47seen the new trains out on site out on
  173. 5:49the tracks, but roughly 5 years ago we
  174. 5:52got a new fleet. For once we actually
  175. 5:54got a new fleet instead of trying to
  176. 5:55super old old rolling stock and
  177. 5:58reintroduce them and and up up rev them
  178. 6:00for the future. So, what did we actually
  179. 6:02get? So, TransPennine
  180. 6:05actually got two sets, but the one that
  181. 6:06they're actually keeping is the 802
  182. 6:08bi-mode. So, it's a Hitachi train.
  183. 6:12IEP series Hitachi train that runs in
  184. 6:14diesel or electric.
  185. 6:17It's interesting that the performance of
  186. 6:19these trains is isn't significantly
  187. 6:20higher than the Class 185 that we've had
  188. 6:22for the last 20 20 25 years, which was
  189. 6:26specifically designed for TransPennine
  190. 6:28route. The big difference with the
  191. 6:31the 802 is it can run higher than 100
  192. 6:32miles an hour. So,
  193. 6:34the original TransPennine scheme was
  194. 6:36actually electrification only scheme,
  195. 6:38but there was very little value in doing
  196. 6:40that as in output benefits because those
  197. 6:43trains could still only run at the speed
  198. 6:44of the same acceleration at the same
  199. 6:46speed over the over the Pennines. So,
  200. 6:47the only place you actually got a better
  201. 6:49journey time was north of York where the
  202. 6:51802 could do more than 100 miles an hour
  203. 6:53on these core main line.
  204. 6:54So, that's one of the reasons the
  205. 6:56original 2012 electrification scheme was
  206. 6:59briefly paused and then was brought back
  207. 7:01in as an enhancement project. So, the
  208. 7:03802 obviously electric mode, it it's
  209. 7:05it's greener,
  210. 7:07but doesn't make a huge difference to
  211. 7:08performance on the route. However, it is
  212. 7:09five coaches, not three, so you've got
  213. 7:11significant capacity bumps on seats
  214. 7:14increase.
  215. 7:16Northern, introduction of electric only
  216. 7:18Class 331, which are one of the highest
  217. 7:22powered fastest accelerating commuter
  218. 7:24trains in the country. So, that helps to
  219. 7:27keep the stopping trains away from the
  220. 7:29fast trains separately.
  221. 7:32Apologies for me going 100 miles an
  222. 7:35hour. I've got 146 slides to get
  223. 7:37through. That's the bad news. The good
  224. 7:38news is very few of them have words in
  225. 7:40them. They are mostly pictures, so we
  226. 7:42should be able to get through through
  227. 7:43them at a fair old pace.
  228. 7:46So, line speed increases on the route.
  229. 7:48Faster journeys doesn't necessarily mean
  230. 7:50we need to go quickly.
  231. 7:52We actually need to avoid going slowly.
  232. 7:54Slow speed is where you get the
  233. 7:56removing slow speed areas is where you
  234. 7:58get your greatest benefit. So, look
  235. 8:01chart there. Instead of thinking of
  236. 8:02miles per hour, think
  237. 8:04hours per mile, or in this case seconds
  238. 8:06per mile. So, the graph the graph there
  239. 8:08is is showing how long it takes for a
  240. 8:10train to travel a mile at a given mile
  241. 8:13per hour. So,
  242. 8:16low speeds is where you get your
  243. 8:18greatest benefit. So, if you improve
  244. 8:21So, the difference in time for a train
  245. 8:23to travel 1 mile between 25 and 30 miles
  246. 8:25an hour is 24 seconds faster if you can
  247. 8:28do it at 30.
  248. 8:29Whereas if you go from 45 to 50, it's
  249. 8:31only 8 seconds. From 75 to 80, it's 3
  250. 8:34seconds. And from 105 to 110, it's only
  251. 8:361.6 seconds.
  252. 8:38That's probably a bit easier to
  253. 8:39understand on the graph on the other
  254. 8:41side in the
  255. 8:4315 miles an hour it takes 2 minutes to
  256. 8:45travel a mile.
  257. 8:46If you double the speed, you halve the
  258. 8:48time. So, you've saved a minute in
  259. 8:50journey time.
  260. 8:51You've gone from 2 minutes to 1 minute.
  261. 8:53If you double the speed again to 60
  262. 8:54miles an hour, you halve the time again,
  263. 8:56but you've now only saved
  264. 8:581 minute. So, let me get this right. 30
  265. 9:01seconds instead of 1 minute.
  266. 9:04You double the speed again to 120 miles
  267. 9:06an hour, you halve the time again, but
  268. 9:07you've now only saved
  269. 9:10how many seconds is that?
  270. 9:1230 seconds. So, it's 2 minutes
  271. 9:15down to 1 minute, down to 30 seconds
  272. 9:17each time you double the speed. So, you
  273. 9:18get your real bang for your book from
  274. 9:21tackling the low speed areas.
  275. 9:23So, that's
  276. 9:24where do we need to focus our effort.
  277. 9:26Also,
  278. 9:27um
  279. 9:28we're moving to digital signaling, so we
  280. 9:30don't need to think just miles per hour,
  281. 9:31we actually need to think kilometers per
  282. 9:33hour. So, when we're trying to squeeze
  283. 9:35the maximum we can out of a certain
  284. 9:36curve. So, we'll we'll we'll work out
  285. 9:38what the what what the radius is, and
  286. 9:41then work out what's the maximum speed
  287. 9:42we can get from that that that curve.
  288. 9:45So, you'll be limited, and then you work
  289. 9:47out the speed, and then you round down
  290. 9:48to 5 miles an hour. However, there may
  291. 9:51be a kph increment in between that that
  292. 9:53could be picked. So, as you go down the
  293. 9:55list, Uh red number is obviously the
  294. 9:57whole number on there. So,
  295. 9:59um you've got mph and km/h increments
  296. 10:02that fit between those mph. So, we need
  297. 10:04to be really careful cuz if we just
  298. 10:06design in mph and then with the future
  299. 10:08digital signaling, we convert to kph,
  300. 10:11if we've done it badly,
  301. 10:14we end up losing lots of speed and lots
  302. 10:16of journey time. So, if we literally
  303. 10:17design at 90 mph and it this design
  304. 10:20design doesn't work at 90.1 mph, which
  305. 10:23is
  306. 10:24unlikely, but it is possible. Transition
  307. 10:25lengths being
  308. 10:27uh totally on the limit, you end up
  309. 10:28having to round down 5 kph or 4.8 kph uh
  310. 10:32when you convert to to kilometers per
  311. 10:34hour. So, it's important that we think
  312. 10:36about that
  313. 10:37um when when we're designing. Similarly,
  314. 10:3940 mph, we really need to design at 40.4
  315. 10:42mph so that we hit the kph kph
  316. 10:45alternative.
  317. 10:49Uh another limit worth bearing in mind
  318. 10:51is uh there's quite a lot 75 mph line
  319. 10:54speeds on the railway. Uh there is a
  320. 10:56reason for that. Um it's classed as
  321. 10:57lower speed. So, from a track quality
  322. 10:59perspective, it's a 35-m wave length um
  323. 11:03uh analysis.
  324. 11:04Now, 35 m/s is 77.8 mph.
  325. 11:09So, 125 kph is actually still in the
  326. 11:13lower speed category. So, that is
  327. 11:15actually your threshold. It's not 75
  328. 11:16mph, it's actually 125 kph. So, if
  329. 11:20you're trying to squeeze a little bit
  330. 11:21more out of the railway without having
  331. 11:22to want to have to start measuring all
  332. 11:24your track quality against uh centimeter
  333. 11:26uh wavelength, then 125 uh kph is is
  334. 11:30your limit. So, there's lots of things
  335. 11:32to to consider in there within your
  336. 11:34designs.
  337. 11:36So, I mentioned
  338. 11:37uh oh, sorry, gradient. So, this is the
  339. 11:40line speed proposed line speed profile
  340. 11:42for west of Leeds from uh
  341. 11:44Manchester Victoria through to Leeds.
  342. 11:46Uh red is uh the up direction, so it's
  343. 11:49up to Manchester. Orange is down to
  344. 11:52Leeds.
  345. 11:53Uh the dotted line is the acceleration
  346. 11:55of acceleration deceleration of a Class
  347. 11:58802 in electric mode.
  348. 12:00Just to show how closely the uh the
  349. 12:02train does actually follow that line
  350. 12:03speed profile. And then the green line
  351. 12:05on the bottom uh are the gradients. So,
  352. 12:08we have some quite challenging gradients
  353. 12:09on the route, which is why train
  354. 12:10performance is is quite important. Uh
  355. 12:13so, coming from Leeds at the right-hand
  356. 12:14side, uh from Whitehall up to Copley
  357. 12:16Hill, you've got short stretch of 1 in
  358. 12:1868. Then a generic gradient of 120 all
  359. 12:21the way up the hill to Morley Tunnel.
  360. 12:24Uh back down the other side, 1 in 119
  361. 12:26again, so the same gradient pretty much
  362. 12:28down to Dewsbury. It's pretty much flat
  363. 12:30until you get to Heaton Lodge. You've
  364. 12:31got short length of 1 in 70s 78 to
  365. 12:34Heaton Lodge. And then you've got 1 in
  366. 12:36105 climb all the way to Standedge
  367. 12:38Tunnel.
  368. 12:40120 1 in 125 down the other side to
  369. 12:42Stalybridge. Uh then some short lengths
  370. 12:44of 1 in 75 until you get to Miles
  371. 12:46Platting, which is the really aggressive
  372. 12:48uh bank from Manchester Victoria to
  373. 12:50Miles Platting at 1 in 47.
  374. 12:52So, challenging gradients on the route.
  375. 12:54Uh there's only one one short level
  376. 12:56stretch, so you've got gradients
  377. 12:58absolutely everywhere. So, the one short
  378. 13:00um level portion within Morley um
  379. 13:02Standedge Tunnel
  380. 13:04um actually had water troughs in. So,
  381. 13:05I'm digressing massively here, but uh
  382. 13:07uh a little fun fact, uh water troughs
  383. 13:09within the tunnel. It's the only place
  384. 13:11in the country we had water troughs in a
  385. 13:13tunnel. So, for those who don't know
  386. 13:14what water troughs are for,
  387. 13:16we don't have them anymore, it's for
  388. 13:17steam trains to pick up water on the
  389. 13:19move. So, that little scoop that would
  390. 13:20come down and literally they they they
  391. 13:22um the inertia in the water would force
  392. 13:24the shoot up uh the shoot and into the
  393. 13:26tender from from the top.
  394. 13:32So, speeds. I mentioned the low speed
  395. 13:34areas being being the key locations, and
  396. 13:36there are a few of them on on
  397. 13:37TransPennine. So, coming out of
  398. 13:38Manchester Victoria, uh 40 mph going up
  399. 13:41Miles Platting uh throughout uh me
  400. 13:43sorry, at the throughout to Manchester
  401. 13:45Victoria,
  402. 13:46uh increasing to 50 and then dropping
  403. 13:47back down to 30 for the curve at Miles
  404. 13:49Platting. So, the curve at Miles
  405. 13:51Platting is a significant constraint for
  406. 13:53journey times. Next one is the 25 mph
  407. 13:55junction at Stalybridge West.
  408. 13:58Uh we've then got uh coming out of
  409. 14:00Standedge Tunnel, 45 mph at Marsden
  410. 14:02coming out of Standedge Tunnel. 25 mph
  411. 14:04through the station at Huddersfield. And
  412. 14:0745 mph at Marsden on the approaches to
  413. 14:10sorry, on Morley on the approaches to
  414. 14:12Leeds.
  415. 14:13So, a lot of those slow speed areas
  416. 14:14we've actually already tackled.
  417. 14:17Uh I mentioned earlier about NWEP Phase
  418. 14:195 electrification. They did the enabling
  419. 14:21works for electrification, i.e. the line
  420. 14:23speed increases. So, the portion between
  421. 14:25Baguley Fold and Stalybridge had already
  422. 14:27been completed before before TRU
  423. 14:29restarted in
  424. 14:31um 2017.
  425. 14:33However, since then we've uh progressed
  426. 14:36um
  427. 14:37no regret schemes, so tackling those low
  428. 14:39speed areas, the places that had had the
  429. 14:41highest benefit for the minimum spend.
  430. 14:45So, uh TR uh s
  431. 14:48those areas being W1, so the west of
  432. 14:50Leeds is split into W numbers, east of
  433. 14:52Leeds is split into E
  434. 14:54uh E numbers. So, on west we have W1, 2,
  435. 14:573, and 4. Those areas were then sub
  436. 14:59split down with with letters as well.
  437. 15:00So, uh W1 was uh W1A was Manchester
  438. 15:04Victoria approaches and Miles Platting.
  439. 15:06Um
  440. 15:08the 2A was uh Stalybridge, and then W4
  441. 15:12uh is Morley and the line speed
  442. 15:13increases between Morley and Leeds.
  443. 15:16So, a quick update on where we're up to.
  444. 15:19Uh completed the works in
  445. 15:212020 for uh line speed increases coming
  446. 15:24out of Manchester Victoria. So, that
  447. 15:26involved the replacement of uh Dantzic
  448. 15:28Bridge just outside Manchester Victoria
  449. 15:30station, which was a major major closure
  450. 15:32of both the tram lines and the the
  451. 15:34railway. Um
  452. 15:36the the the bridge not only was life
  453. 15:39expired and needing renewing anyway, we
  454. 15:40couldn't do line speed increases over it
  455. 15:42without without doing those works.
  456. 15:46So, Miles Platting curve. Uh we actually
  457. 15:48looked at various options for Miles
  458. 15:49Platting curve. Uh more major scheme
  459. 15:51demolishing several bridges and
  460. 15:52remodeling junctions and going well
  461. 15:53outside the network rail boundary.
  462. 15:56Um which was 60 mph with a 55 mph scheme
  463. 15:59that stayed within boundary. We could
  464. 16:01see remodel the entirety of Miles
  465. 16:03Platting junction.
  466. 16:06We had a a lesser scheme or the smaller
  467. 16:08scheme was 50 mph, which only required
  468. 16:11um some minor earthworks and
  469. 16:13reconstruction or widening of uh Queen's
  470. 16:16Road Bridge.
  471. 16:18Now, through development, we ended up
  472. 16:19So, that's the option we picked. Uh
  473. 16:20through development, we actually ended
  474. 16:22up with a 55 mph scheme utilizing
  475. 16:24exceptional efficiencies with this just
  476. 16:26slightly cutting the corner off a little
  477. 16:27bit more.
  478. 16:28Um what does it look like? So, widening
  479. 16:31Queen Street Bridge. Um that's the some
  480. 16:33of the final engineering works. And you
  481. 16:35can see the old alignment on the
  482. 16:36right-hand side um the new uh
  483. 16:39cutting the corner off scheme on the
  484. 16:40left-hand side.
  485. 16:44So, that's a minute of journey time
  486. 16:46saving just with one one intervention
  487. 16:48that's about quarter of a mile long.
  488. 16:50Stalybridge.
  489. 16:52Um we looked at various schemes, some
  490. 16:54capacity schemes, some line speed
  491. 16:56increase schemes. So, quickly we'll see
  492. 16:58through these just to show the volume of
  493. 16:59the work that that we've actually looked
  494. 17:00at on TRU. So, that's that's the
  495. 17:02existing layout as a single line diagram
  496. 17:04form at Stalybridge. So, it's 50 mph at
  497. 17:06the west end of the station and 50 mph
  498. 17:09towards Manchester Piccadilly, which is
  499. 17:11the bottom left. Um uh sorry. Yeah,
  500. 17:14bottom left. Top left is the route to uh
  501. 17:16Manchester Victoria, which is now the
  502. 17:17main route. So, ironically, the junction
  503. 17:20was actually re-handed 15-20 years ago
  504. 17:22um to make uh Piccadilly the priority
  505. 17:25route. And the intervention was
  506. 17:27implemented uh in the same couple of
  507. 17:29months that the DfT actually decided
  508. 17:30they wanted to send the trains back to
  509. 17:31Manchester Victoria. So, uh we re-handed
  510. 17:34the junction and we haven't re-handed it
  511. 17:36again. We've actually made it the same
  512. 17:37speed both ways, so they can choose
  513. 17:39whichever option they want in the future
  514. 17:40and it doesn't actually matter. So,
  515. 17:42we did look at numerous schemes. Uh
  516. 17:45an entire bypass scheme, so miss out
  517. 17:47Stalybridge station altogether.
  518. 17:50Um with the bypass station and put
  519. 17:52platforms on them, we can lose
  520. 17:53Stalybridge West junction.
  521. 17:55Um we looked at just line speed increase
  522. 17:58schemes without changing the capacity,
  523. 17:59so a version of 10.2 is is the one that
  524. 18:02we ended up with.
  525. 18:04Um looked to move the junction to the
  526. 18:06other end of the station.
  527. 18:08Looked to moving the station to the
  528. 18:09other end of the junction. All different
  529. 18:11ways of achieving um similar outputs. We
  530. 18:14looked at options that uh grade
  531. 18:16separated, so we didn't go for line
  532. 18:17speed increase, but went for capacity
  533. 18:19only and grade separated the junction
  534. 18:20with a quite severely graded uh flyover
  535. 18:23at the west end of the station.
  536. 18:25Um and then the the the very expensive
  537. 18:28scheme that nobody was interested in,
  538. 18:29which is do both, grade separate and get
  539. 18:31your full line speed increases and
  540. 18:33completely remodel the station at the
  541. 18:34same time.
  542. 18:36So, what did we end up with? Um
  543. 18:39So, in essence, exactly the same
  544. 18:41operational capability, but at a higher
  545. 18:43speed. So, the open and out junction
  546. 18:4525 mph open and out junction to get to
  547. 18:47Manchester Victoria has been replaced uh
  548. 18:49by a fixed up juice double junction at
  549. 18:5250 mph, so the route is now 50 mph both
  550. 18:55ways.
  551. 18:57Completed Easter of this year.
  552. 19:00Or last year, sorry. Uh with the OLE
  553. 19:02completed this year. So, about uh middle
  554. 19:04of August, the first
  555. 19:06uh electric train from uh Manchester
  556. 19:08Victoria to Stalybridge uh was entered
  557. 19:10into service,
  558. 19:11uh which has made a a huge difference.
  559. 19:14So,
  560. 19:15um
  561. 19:16electrification to Stalybridge. Why was
  562. 19:18electrification to Stalybridge so
  563. 19:20important and why is it an early phase
  564. 19:22of TRU? Cuz the remainder of the route
  565. 19:24beyond Stalybridge isn't going to happen
  566. 19:25for at least another 7 years. So, why
  567. 19:27was it important to get get the wires as
  568. 19:29far as Stalybridge? The reason for that
  569. 19:31is lack of um platform capacity at
  570. 19:33Manchester Victoria.
  571. 19:35So, all the electrified uh services that
  572. 19:37we've introduced as part of NWEP from
  573. 19:39the west of Manchester coming to
  574. 19:40Manchester, get to Manchester Victoria,
  575. 19:43and they can't go any further because
  576. 19:44there's no wires. So,
  577. 19:45uh two of those services are now all
  578. 19:47don't terminate in Manchester Victoria.
  579. 19:48They actually terminate at Stalybridge.
  580. 19:50So, we need the capability of those
  581. 19:51electric trains to carry on through
  582. 19:53Marsden Victoria. So, that's that's the
  583. 19:54reason why Stalybridge was one of the
  584. 19:57early electrification schemes.
  585. 20:01Moving over towards Leeds, so Morley
  586. 20:02station.
  587. 20:04Um
  588. 20:05So,
  589. 20:06existing Morley station, or the now
  590. 20:08redundant Morley station on the
  591. 20:09right-hand side there, immediately
  592. 20:10outside the portal of Morley tunnel, on
  593. 20:12quite a sharp curve. So, on the
  594. 20:14left-hand photo there, you can see the
  595. 20:15old station in the background, and the
  596. 20:17construction of a new station in the
  597. 20:18foreground.
  598. 20:20So, the existing station is on roughly a
  599. 20:21450-m radius, which limits the speed to
  600. 20:24about 55 mph. But, because of its very
  601. 20:27tight six-foot, it's actually limited to
  602. 20:2840 mph to get any passing clearances, 45
  603. 20:30mph to get any passing clearances. So,
  604. 20:33combination of tight six-foot and radii
  605. 20:37meant very low speed through the
  606. 20:38existing platform. Simply moving that
  607. 20:40station 300 m did two things. One, went
  608. 20:44from a 450-m radius to a 730-m radius,
  609. 20:47which meant we could up the speed from
  610. 20:4845 to 70 mph. Just by moving the station
  611. 20:51onto a slightly flatter bit of curve.
  612. 20:54It also enabled us
  613. 20:55to fit a signal between the tunnel and
  614. 20:57the station.
  615. 20:59It doesn't sound that important, but it
  616. 21:00is when it comes to managing trains
  617. 21:02within the tunnel. So, we've actually
  618. 21:03introduced signals within tunnel within
  619. 21:05a tunnel.
  620. 21:06We're applying what we call tunnel
  621. 21:07controls. So, the round London
  622. 21:09Thameslink, they have multiple trains in
  623. 21:11the tunnel at the same time, but they're
  624. 21:12London's a special case. We're
  625. 21:14generically not allowed to have multiple
  626. 21:16trains in the tunnel at the same time.
  627. 21:17So, we have what's called tunnel
  628. 21:18controls, which does allow us to do
  629. 21:20that, but we'll only allow the second
  630. 21:22train into the tunnel if the first train
  631. 21:24has a signaled cleared cleared exit. So,
  632. 21:26you're not planning on stopping the
  633. 21:28train in the tunnel. You could in
  634. 21:29emergency, but you don't plan on
  635. 21:30stopping the train.
  636. 21:31So, if that first of the two trains
  637. 21:33stops at Morley, the second train can't
  638. 21:35enter the tunnel.
  639. 21:36But, if it's one signal section beyond
  640. 21:38the tunnel, it now can because it's
  641. 21:39cleared the exit signal. Um so, it's
  642. 21:42actually from an operational perspective
  643. 21:43and signaling perspective, it makes a
  644. 21:45big difference, not just from a line
  645. 21:46speed increase perspective.
  646. 21:50Uh that's the track track works enabling
  647. 21:52works uh before we started building the
  648. 21:53platforms.
  649. 21:55Uh and that's our
  650. 21:56finished station as of last year.
  651. 21:59Few teething problems getting the lifts
  652. 22:01lifts working, and there was some
  653. 22:03there was an issue with the copers uh
  654. 22:05being out of tolerance to the track on
  655. 22:07one of the platforms, uh but all that
  656. 22:09all that is sorted now.
  657. 22:11I'll come back to talk about platforms
  658. 22:12on curves later on and train dispatch
  659. 22:14because uh
  660. 22:15the were issues associated with them.
  661. 22:18Um nothing to do with line speed
  662. 22:20increase, but we also put additional
  663. 22:22crossover in at Batley.
  664. 22:24Um
  665. 22:25This is actually needed for next uh next
  666. 22:28year's W or the start of the W3 big
  667. 22:30blockades next year. So, this having a
  668. 22:32crossover, the facing crossover at
  669. 22:34Batley allows a stopping train to run
  670. 22:36from Leeds, crossover onto the wrong
  671. 22:38line, and run signaled wrong road
  672. 22:39through Batley station to Dewsbury,
  673. 22:41where it can turn back and go to Leeds,
  674. 22:43which means we can still operate a Leeds
  675. 22:45to um Dewsbury shuttle service picking
  676. 22:48up all the stopping stations while we're
  677. 22:50doing our major blockades around
  678. 22:52Huddersfield.
  679. 22:55So, back to line speed profile. So, I
  680. 22:57mentioned all the elements of work
  681. 22:59that's already been done.
  682. 23:01Uh one phase that's still in development
  683. 23:02it is W2B and W2C.
  684. 23:06Um so, the reason part of the reason
  685. 23:08that's still in development is this is
  686. 23:10the one part of the scope that's still
  687. 23:11not fixed. So, I mentioned earlier about
  688. 23:13introduction of additional freight
  689. 23:15trains. Um
  690. 23:17we require additional capacity, i.e. a
  691. 23:19third line uh between Marsden and
  692. 23:22Huddersfield to accommodate the slow
  693. 23:24trains running in the up direction up up
  694. 23:26the hill. So, because of the evolving
  695. 23:28scope associated with freight, um that
  696. 23:31portion of the program has has gone
  697. 23:33back. So, that's still in grip three.
  698. 23:35Um but, it's it's it's moving forward
  699. 23:37again for completion, I think, in 2032.
  700. 23:42Uh
  701. 23:43that part of the route also includes our
  702. 23:45worst structures from a gauge clearance
  703. 23:46perspective. Uh Stalybridge tunnel and
  704. 23:49Scout tunnel are
  705. 23:51tiny really really really small tunnels.
  706. 23:53Uh getting electrification and W12
  707. 23:56through there is about a 600-mil track
  708. 23:58lower to get through through the
  709. 23:59tunnels.
  710. 24:00Um particularly Stalybridge, it isn't um
  711. 24:03in the best of uh condition. The western
  712. 24:06half has shallow mine workings
  713. 24:08immediately under the tunnel, and the
  714. 24:10western third is sat on running sands.
  715. 24:13Uh so, there's no nice transition
  716. 24:13halfway through the tunnel. We're trying
  717. 24:15to do a track lower all the way through.
  718. 24:16So, we have a slab track solution for
  719. 24:19for both of those those tunnels, uh but
  720. 24:21it's a fairly major intervention and
  721. 24:23major closure of the route to to
  722. 24:24facilitate
  723. 24:26those works. There are various
  724. 24:28overbridges as well, but the tunnels are
  725. 24:29the are the main issue.
  726. 24:31Um then the the the the juicy element of
  727. 24:34today's presentation, which I've not
  728. 24:35even actually got onto yet, um
  729. 24:37is the W3 footprint, or in this case W3
  730. 24:40and the remainder of W4, which is around
  731. 24:42the Dewsbury area. So, it's either W3/4
  732. 24:46or W3 quarters, depending whether you
  733. 24:48want to be facetious or not. Um
  734. 24:51So, I mentioned earlier
  735. 24:53about fast trains catching stopping
  736. 24:55trains. It's not always good to go for
  737. 24:57really high line speeds cuz all it does
  738. 24:58it means the fast train catches the
  739. 25:00stopper quicker.
  740. 25:01Um so, generically on the route, we
  741. 25:03haven't really gone above 80 mph with
  742. 25:05one exception, and that's on the W3
  743. 25:07footprint.
  744. 25:08It's a big difference on the W3
  745. 25:09footprint though. Um we have four
  746. 25:11tracks, which I'm going to explain. So,
  747. 25:13it's currently two, but we're increasing
  748. 25:14it to four. The fact that we've
  749. 25:15segregated the fast trains from the slow
  750. 25:17trains and the freight trains, that
  751. 25:19differential now no longer makes
  752. 25:20difference. In fact, it helps cuz it
  753. 25:22allows the fast trains to to be able to
  754. 25:23get past the stoppers.
  755. 25:27So, more capacity. So, uh that was
  756. 25:30Heaton Lodge back in the 1980s before we
  757. 25:32stripped stripped out. So, the core to
  758. 25:34the right is now one track, and the
  759. 25:35second track from the left is also
  760. 25:37missing.
  761. 25:40So, where is W3 on the route? The
  762. 25:41section from Huddersfield through to uh
  763. 25:44just short of Dewsbury.
  764. 25:46A bit more of a sexy map than the one I
  765. 25:47had up earlier.
  766. 25:50And the key portion of that it's well,
  767. 25:52it's four-tracking all the way from
  768. 25:53Huddersfield to to Ravensthorpe, but the
  769. 25:55key portion is is Heaton Lodge to
  770. 25:57Ravensthorpe
  771. 25:58in the middle.
  772. 26:00So, why why is this key to TIU? So, what
  773. 26:03services run on TIU?
  774. 26:05So, we've got TransPennine services, uh
  775. 26:07which are we the remit is for four fast
  776. 26:10and two semi-fast services
  777. 26:12um
  778. 26:13between York and Hull through Leeds,
  779. 26:15Huddersfield through to Manchester
  780. 26:16Victoria.
  781. 26:18So, we've got TransPennine six
  782. 26:20TransPennine trains running.
  783. 26:22We've got four different one-an-hour
  784. 26:24services for for for stoppers, which uh
  785. 26:27mostly Northern, some of them being
  786. 26:28transferred to TransPennine, but they're
  787. 26:30going back to Northern again. But,
  788. 26:31you've got a Bradford-Huddersfield
  789. 26:32stopper, Leeds-Huddersfield stopper,
  790. 26:34Wakefield-Huddersfield stopper, and also
  791. 26:37a Calder Valley to Leeds stopper. You've
  792. 26:39now also got the TransPennine uh Leeds
  793. 26:42via Castleford to Manchester Piccadilly
  794. 26:43stopper as well in amongst all that lot.
  795. 26:46So, very conflicting moves across that
  796. 26:48that middle part of the route. Got Grand
  797. 26:50Central every other hour coming across
  798. 26:52the route from from Bradford through
  799. 26:54towards Wakefield.
  800. 26:56Um
  801. 26:57we did have East Coast wanting to run
  802. 26:59trains to Huddersfield, but those have
  803. 27:01now
  804. 27:02uh been that proposal's been withdrawn.
  805. 27:04And there's a lot of freight,
  806. 27:06uh which was originally predominantly
  807. 27:08via the Calder Valley and Brighouse, so
  808. 27:10from the top left. Uh with the recent
  809. 27:12change in the scope to for W12, all
  810. 27:14those W12 services run via Diggle. So,
  811. 27:17there's up to 15 trains a day each way
  812. 27:19via Diggle, as well as the 15-ish trains
  813. 27:22that run via the Calder Valley.
  814. 27:26So,
  815. 27:27that portion is called on the on on on
  816. 27:29on the program is the eye of the needle.
  817. 27:31It's the really really difficult part on
  818. 27:33TIU, and that's the area where we really
  819. 27:35need to deal with capacity. So, all the
  820. 27:37schemes I've just talked about are all
  821. 27:38line speed increase schemes. None of
  822. 27:40them got nothing to do with capacity. W3
  823. 27:43is a capacity scheme with line speed
  824. 27:45increases within it.
  825. 27:48So, not only do we have all these
  826. 27:50conflicting crossing services, we've
  827. 27:53also got um
  828. 27:55fast trains catching stopping trains.
  829. 27:56So, between Leeds and Huddersfield,
  830. 27:58there's seven station stops for a
  831. 27:59stopper. It pretty much takes four
  832. 28:01station stops for a fast train to catch
  833. 28:02a stopping train if they're in
  834. 28:05if they're in 15-minute separation. So,
  835. 28:08the ability to remove that stopper from
  836. 28:11the path of a fast train by the time it
  837. 28:12gets to Dewsbury or at least
  838. 28:13Ravensthorpe, it it is very important.
  839. 28:19So, what does that mean? So, that's the
  840. 28:20line diagram of the existing layout
  841. 28:22between Huddersfield through to
  842. 28:23Ravensthorpe. So, apart from that, a
  843. 28:25short three-track section from Heaton
  844. 28:27Lodge through to Ravensthorpe, which
  845. 28:28actually picks up the
  846. 28:30uh up um Wakefield trains, so the
  847. 28:33westbound Wakefield trains.
  848. 28:35Um
  849. 28:36we've pretty much got two-track railway.
  850. 28:39So, what we're proposing to do for TIU,
  851. 28:42uh I mentioned four-tracking, that's
  852. 28:43exactly what we're doing. We need to
  853. 28:45create fast lines to remove those four
  854. 28:47fast and two semi-fast services away
  855. 28:49from everything else. So, what does that
  856. 28:51look like?
  857. 28:53In essence, we turn the existing railway
  858. 28:56into a two-track railway.
  859. 28:58So, we get rid of the third line, put a
  860. 29:00double junction in at Ravensthorpe, and
  861. 29:02then we add two fast lines over the top
  862. 29:04to to get the fast trains out of there.
  863. 29:06I've slightly oversimplified, but that's
  864. 29:07in essence what we're doing. We're
  865. 29:08stripping down what's already there
  866. 29:10slightly, and then adding two through
  867. 29:11lines that avoids all the other traffic.
  868. 29:15So, from a line diagram perspective,
  869. 29:17that's what it looks like. So, I'm
  870. 29:18actually starting with a scheme that
  871. 29:19we've we've actually progressing, and
  872. 29:21I'll quickly run through all the the the
  873. 29:2310 other options that we we did actually
  874. 29:25look at at one time or another.
  875. 29:27So,
  876. 29:29um
  877. 29:31if I was going to talk through the
  878. 29:32option selection process, it would
  879. 29:33literally be a three-hour presentation.
  880. 29:35So, I'm I'm going to talk through the
  881. 29:36options that were considered, but not
  882. 29:37how they were considered and how they
  883. 29:39were sifted. Uh but, it was a very very
  884. 29:42uh exhaustive process.
  885. 29:44Uh it was it was probably three three
  886. 29:46different stages to get down from 10
  887. 29:47options then down to five options and
  888. 29:49then down to two and then to one. So, it
  889. 29:51was actually four stages. Uh
  890. 29:53we will call expert panel so
  891. 29:55um
  892. 29:56the appropriate development for the
  893. 29:57level of um
  894. 29:59investigation was being done. So, each
  895. 30:01time you sifted them down, you did more
  896. 30:02development until you got to the last
  897. 30:04two when we actually designed uh proper
  898. 30:06schemes and costed them and made a full
  899. 30:07operational assessment of the options.
  900. 30:09So, the version that's on screen there
  901. 30:12is is is the scheme that's been adopted
  902. 30:14and that's the
  903. 30:15four tracks all the way through on the
  904. 30:17south fast lines on the south side of
  905. 30:18the railway
  906. 30:20all the way between Ravensthorpe and
  907. 30:21Huddersfield with a grade separated
  908. 30:22junction at at Ravensthorpe including
  909. 30:25grade separating the slow lines coming
  910. 30:27from Leeds which we'll talk about a
  911. 30:29little bit more in a moment. The other
  912. 30:30main contender uh that got down to the
  913. 30:33last two so, layout number five in this
  914. 30:34instance um
  915. 30:36was uh fast lines to the north as far as
  916. 30:39Heaton Lodge then have your grade
  917. 30:40separation and then to the south as you
  918. 30:42as you're running to Huddersfield. Um
  919. 30:44so, operationally um it was meant at an
  920. 30:47at-grade junction at Ravensthorpe uh and
  921. 30:49there were different comp- uh
  922. 30:50complications from a consent perspective
  923. 30:53about having a uh grade separation in
  924. 30:55what's in essence in a in a cutting or
  925. 30:57pass half of it in a cutting at
  926. 30:59Ravensthorpe as opposed to highly
  927. 31:01visible um
  928. 31:03uh intrusive grade separation in the
  929. 31:05Heaton Lodge area. Uh but, it was a very
  930. 31:07very close decision.
  931. 31:09Um I think it was the the the option we
  932. 31:11chose was actually the slightly more
  933. 31:12expensive option uh but, it was easy
  934. 31:14from a consent perspective and
  935. 31:16operationally the better better layout
  936. 31:18because of the extra grade separation.
  937. 31:21Other options, Heaton Lodge area the the
  938. 31:24footprint uh was extremely constrained
  939. 31:26so,
  940. 31:28um
  941. 31:29this portion of the route to the uh west
  942. 31:31of Heaton Lodge is London Northwestern.
  943. 31:33Heaton Lodge through to Ravensthorpe is
  944. 31:34actually L&W Junction railway but, the
  945. 31:36London Northwestern fairly typical
  946. 31:38London Northwestern if they have four
  947. 31:40track railways but, they did it on the
  948. 31:41cheap but, it was four tracks at six
  949. 31:42foot so, you're pretty tight for space
  950. 31:44uh to to reinstate that. And in the
  951. 31:47Deighton area um
  952. 31:48we'd sold off some land so, uh there's a
  953. 31:50big warehouse which was at
  954. 31:51Poundstretcher I can't remember who owns
  955. 31:53it now. Um but, where they've sold off
  956. 31:55adjacent sidings and they've actually
  957. 31:57encroached on the on the main running
  958. 31:58lines as well so, it's very very tight
  959. 31:59area uh in there. So, we looked at an
  960. 32:02option of let's go down to three tracks
  961. 32:04for a short section to make it easier
  962. 32:06operationally that didn't work. So, that
  963. 32:08was that was removed.
  964. 32:10Um no new grade separation so, use the
  965. 32:12existing underpass at Cooper Bridge at
  966. 32:14Heaton Lodge.
  967. 32:15Uh and then work everything around that
  968. 32:18but, you've now got four at-grade
  969. 32:19junctions within about a mile and a half
  970. 32:21so, you've got Heaton Lodge
  971. 32:23Heaton Lodge but, two new junctions to
  972. 32:25get the slow lines across and Bradley
  973. 32:27Junction. So, operationally having four
  974. 32:28at-grade junctions within such a short
  975. 32:30length was was never really going to
  976. 32:32work so, that got discounted.
  977. 32:35Uh keep the slow lines on the north all
  978. 32:37the way through up to Huddersfield.
  979. 32:40Uh
  980. 32:40two disadvantages you now got the
  981. 32:42Bradley Bradley Wood curve so, you've
  982. 32:43got the slow trains joining the fast
  983. 32:45lines
  984. 32:46uh which means now they can pick up
  985. 32:47Bradley station if you put the new
  986. 32:49station on the old re- bubble station on
  987. 32:51the slow lines.
  988. 32:52Uh but, the fast lines are also taking
  989. 32:54the lower speed route so, going through
  990. 32:55the underpass at Cooper Bridge is 70 mph
  991. 32:58where the scheme we've we've picked is
  992. 32:59100 mph. And you're going around the
  993. 33:02north side of Huddersfield station which
  994. 33:03you'll see later as to why it's slower
  995. 33:05but, it's 25-30 mph around the back of
  996. 33:08the station whereas the lower number
  997. 33:09platforms at the bottom of the higher
  998. 33:11speed. So, to be at the south side is
  999. 33:13actually better for the fast line. So,
  1000. 33:14all that works uh there are additional
  1001. 33:17uh operational conflicts with the
  1002. 33:19Bradford stopper joining the fast lines
  1003. 33:21and it's a lower speed solution.
  1004. 33:24You could get rid of the
  1005. 33:25Bradford trains by putting a massive
  1006. 33:26flyover in but, that was uh verging on
  1007. 33:28unachievable uh
  1008. 33:31without building a extremely long
  1009. 33:32viaduct.
  1010. 33:34Uh that's actually a variant on the
  1011. 33:35scheme that we've adopted.
  1012. 33:38Uh
  1013. 33:39instead of having the fast lines to the
  1014. 33:40north or the south, put them through in
  1015. 33:42the middle. So, instead of grade
  1016. 33:43separating ones, we do half a grade
  1017. 33:44separation twice so, half of it at
  1018. 33:46Ravensthorpe and half of it at Heaton
  1019. 33:48Lodge. Operationally that's
  1020. 33:50significantly better
  1021. 33:51uh but, increased cost cuz you're doing
  1022. 33:53two although they're only single track
  1023. 33:54grade separations, you're doing them at
  1024. 33:56two locations. So, it's a higher cost
  1025. 33:59and it's actually harder from a
  1026. 34:00maintenance perspective. If you need to
  1027. 34:01maintain the fast lines but, your slow
  1028. 34:03lines are operational, you've then got
  1029. 34:04to cross the slows to get the fast which
  1030. 34:06is the issues that you've got on the
  1031. 34:07main Leeds Cross main line. So, um
  1032. 34:10having pairs of up down up down
  1033. 34:12arrangement is far easier to block two
  1034. 34:14and get your maintenance access than it
  1035. 34:15is to have up up down down arrangement.
  1036. 34:17So, although operationally that is
  1037. 34:19better, uh it was more expensive and
  1038. 34:21it's it's actually harder to maintain.
  1039. 34:23Um half and half of having the fast on
  1040. 34:25the outside instead of the inside.
  1041. 34:27We looked at having the fast lines in
  1042. 34:29the center all the way through as far as
  1043. 34:30Huddersfield.
  1044. 34:32And we looked at doing the opposite
  1045. 34:33having the slow lines in the center all
  1046. 34:35the way through to Huddersfield. So,
  1047. 34:36there were lots and lots of options that
  1048. 34:38we looked at. We even looked at off off
  1049. 34:41boundary schemes. So, the yellow line
  1050. 34:42you can see there is the original
  1051. 34:44Midland Railway branch line that went
  1052. 34:46from
  1053. 34:47Mirfield through to Huddersfield. We
  1054. 34:49even looked at reinstating part of that
  1055. 34:50for for the slow lines.
  1056. 34:53So, instead of trying to squeeze extra
  1057. 34:55tracks on the existing footprint within
  1058. 34:56the current land boundary, uh compulsory
  1059. 34:58purchase back the old track bed and go
  1060. 35:00via the old Midland route for the slow
  1061. 35:01lines to get to Huddersfield.
  1062. 35:06We even looked at massive massive left
  1063. 35:08field left field big bang schemes. So,
  1064. 35:11this will make few people smile but,
  1065. 35:13let's forget the existing railway. Let's
  1066. 35:15build a HS2 railway all the way from
  1067. 35:18Ravensthorpe through Huddersfield to
  1068. 35:20beyond Huddersfield so, almost up to
  1069. 35:22Slaithwaite.
  1070. 35:23So, I'll I'll just zoom in slightly on
  1071. 35:25that. So, the idea of this is instead of
  1072. 35:28upgrading the entirety of TIU to get on
  1073. 35:30west of Leeds roughly a 10-minute
  1074. 35:32journey time
  1075. 35:33if you could forget the existing railway
  1076. 35:35and build a much bigger scheme for a
  1077. 35:37short stretch at much much higher speed,
  1078. 35:40uh could you get that entire journey
  1079. 35:41time just with one one off-line scheme
  1080. 35:43which removes all the disruption of
  1081. 35:45upgrading the existing railway just
  1082. 35:47building a new one. So, if we come up at
  1083. 35:49Ravensthorpe on the right hand side,
  1084. 35:51follow the hillside uh as far as you
  1085. 35:53can, couple of viaducts there in blue
  1086. 35:55and then you disappear into a a very
  1087. 35:57long tunnel under Kirkheaton
  1088. 36:00uh back out
  1089. 36:01uh to a short viaduct on the approach to
  1090. 36:03to Huddersfield back into another
  1091. 36:04tunnel, another viaduct over the valley
  1092. 36:07at Huddersfield with a new
  1093. 36:09station intersecting the existing
  1094. 36:11station. So, at the east end of the
  1095. 36:12existing station at a higher level uh
  1096. 36:14creating intersecting station there,
  1097. 36:16carry straight on and miss out all the
  1098. 36:18horrible uh low speed reverse curves
  1099. 36:20coming out of Huddersfield and tie in um
  1100. 36:22in the Mirfield Bridge area.
  1101. 36:24So, the benefit of that scheme is it not
  1102. 36:26only gives you a much much higher speed
  1103. 36:28over that portion of route, it gave us
  1104. 36:30the sub option of um uh trains that miss
  1105. 36:33out Huddersfield as a stop. So, through
  1106. 36:35train so, you've got fast train and
  1107. 36:37we'll have a super fast train and
  1108. 36:38non-stop from Leeds to to Manchester.
  1109. 36:41That did actually get the same journey
  1110. 36:42time
  1111. 36:44improvement just doing that scheme as
  1112. 36:46everything else that we're currently
  1113. 36:47doing.
  1114. 36:48The the the problem was the cost.
  1115. 36:50So, it's actually the topography of that
  1116. 36:51part of the route. We had some very very
  1117. 36:53serious deep 100-m deep tunnels and
  1118. 36:55viaducts on the route. So, it was
  1119. 36:57feasible but, it was very expensive.
  1120. 37:00So, we've pretty much looked at
  1121. 37:01everything we could possibly do, all the
  1122. 37:03different arrangements on the existing
  1123. 37:04footprint and we've also looked at minor
  1124. 37:06schemes off footprint and then the the
  1125. 37:08big left field let's let's just forget
  1126. 37:10it and go go HS2 style scheme.
  1127. 37:15So, moving into grid three
  1128. 37:16of the 10 schemes that we had
  1129. 37:17previously, this is where Jim should
  1130. 37:19start to recognize what we what we what
  1131. 37:20I'm presenting.
  1132. 37:22Um so, we actually got the the the track
  1133. 37:24designer for Huddersfield from Arup's
  1134. 37:25Arup's in the room which is why I just
  1135. 37:27mentioned Jim. Sorry Jim for name
  1136. 37:28dropping you like that. Um
  1137. 37:30so, moving into grid three, we sifted
  1138. 37:32the 10 options down to to five options.
  1139. 37:35Uh so, one and five the top and bottom
  1140. 37:37ones were the ones that made it to the
  1141. 37:38final sift. The the middle ones are uh
  1142. 37:40all um fast lines in the middle or fast
  1143. 37:42lines on the outside all the way through
  1144. 37:44different variants.
  1145. 37:46So, we're going down to option one
  1146. 37:49which is the version that we've gone
  1147. 37:50for. I'll come back to that in a moment
  1148. 37:52of a grade separated junction at um
  1149. 37:54uh Ravensthorpe or Thornhill Junction at
  1150. 37:56the right hand side with the fast lines
  1151. 37:57all the way through on the south until
  1152. 37:59you get to Huddersfield.
  1153. 38:02Layout five was uh fast lines to the
  1154. 38:05north to Heaton Lodge and then the grade
  1155. 38:06separation there as I mentioned a couple
  1156. 38:08of minutes ago.
  1157. 38:10So,
  1158. 38:11that's the scheme that we are currently
  1159. 38:12presenting or currently um
  1160. 38:17progressing.
  1161. 38:18So, we've got the existing layout at the
  1162. 38:19top and the um the proposed layout at
  1163. 38:22the bottom with the red being the fast
  1164. 38:23lines picking up all the fast services
  1165. 38:25and the blue the slow lines picking up
  1166. 38:26your stoppers and all your freight
  1167. 38:28freight services.
  1168. 38:29And once you get to Huddersfield, how we
  1169. 38:30manage trains there, uh I've got some
  1170. 38:32more slides in a moment.
  1171. 38:34But, the plan is to keep everything as
  1172. 38:36separate as possible.
  1173. 38:39So, why why grade separate
  1174. 38:41at all the additional grade separation
  1175. 38:43at Ravensthorpe? So, layout one on the
  1176. 38:45left hand side, the adopted version
  1177. 38:48um
  1178. 38:49and why separate the two junctions? So,
  1179. 38:52uh the junction names are actually uh
  1180. 38:54out of date on there. So, Thornhill L&W
  1181. 38:55Junction is now Ravensthorpe straight
  1182. 38:57Ravensthorpe and Ravensthorpe Junction
  1183. 38:59is now called Bay Junction.
  1184. 39:02I'll explain why it's called Bay
  1185. 39:03Junction shortly.
  1186. 39:04Um
  1187. 39:05So, the reason for separating them is uh
  1188. 39:08if we have the two junctions a full
  1189. 39:10train length apart, it allows you to get
  1190. 39:13a s- uh stopping train so, if you're
  1191. 39:15coming from from Leeds
  1192. 39:17uh on the bottom line, the stopping
  1193. 39:18train can get off the fast line without
  1194. 39:20needing a forward route set onto the
  1195. 39:22slow lines. So, it doesn't matter what's
  1196. 39:23happening on the slow lines at
  1197. 39:24Ravensthorpe. That stopping train can
  1198. 39:26still get off the fast lines and release
  1199. 39:28the fast train behind it. It can
  1200. 39:30basically uh be held as it's a holding
  1201. 39:32line or capable of holding the stopping
  1202. 39:34train to then release that following
  1203. 39:36fast train as quickly as possible. As
  1204. 39:38soon as you have an at-grade junction,
  1205. 39:40uh that becomes far more difficult to
  1206. 39:41do. Which is a a little bit easy to see
  1207. 39:43on the next slide uh because the
  1208. 39:45junction is the opposite way around. So
  1209. 39:47if you go for the layout one that we've
  1210. 39:48got of the fast lines on the south, but
  1211. 39:50you put an upgrade junction, the little
  1212. 39:52red train there which is a stopper, now
  1213. 39:55can go on to the
  1214. 39:56up slow line until the down fast train
  1215. 39:58has passed. So you've got that
  1216. 39:59conflicting move that you need to
  1217. 40:01manage. You don't have that issue with a
  1218. 40:03grade separation. That train can just be
  1219. 40:04flighted and can get out of the way
  1220. 40:05quickly. So it's really important from a
  1221. 40:08not only from a
  1222. 40:09timetable planning, but from a
  1223. 40:10performance perspective. If that stopper
  1224. 40:12is running slightly late, it can get out
  1225. 40:13of the out of the way quicker.
  1226. 40:18So, four tracks up to Huddersfield, what
  1227. 40:20do we do at Huddersfield?
  1228. 40:23So that's the existing layout of
  1229. 40:24Huddersfield. You've got two lines
  1230. 40:25approaching from the Leeds end.
  1231. 40:28We've got the
  1232. 40:29platform, what's currently platform one
  1233. 40:31which is the up through line,
  1234. 40:33platform eight which is the down through
  1235. 40:35line at the top, and a center center
  1236. 40:37through line which is bi-directional but
  1237. 40:39generally used for turning back your
  1238. 40:40Manchester to Huddersfield stopper and
  1239. 40:42your Leeds to Huddersfield stopper. And
  1240. 40:44then you've got two very short bays as
  1241. 40:46well. One is two carriages long and one
  1242. 40:47is one carriage long. Just almost
  1243. 40:49useless.
  1244. 40:50So there's various constraints at
  1245. 40:51Huddersfield. It is a grade one listed
  1246. 40:53structure.
  1247. 40:55Which obviously includes the the the
  1248. 40:56facade at the front of the station, but
  1249. 40:58it also includes various elements within
  1250. 40:59the station. So the
  1251. 41:01the subway is part of the listing.
  1252. 41:04There are two of the original station
  1253. 41:06columns. And by original, I don't mean
  1254. 41:07the current roof that we've got. I mean
  1255. 41:08the the the 1830s roof.
  1256. 41:12So the what roof we currently got is
  1257. 41:141880s, I think. Something of those that
  1258. 41:17that ilk.
  1259. 41:18But those are the original original roof
  1260. 41:19columns.
  1261. 41:21We've got the tea rooms. So wooden tea
  1262. 41:23room on island platform. Well, tea rooms
  1263. 41:24in themselves aren't particularly
  1264. 41:26significant, but apparently that's the
  1265. 41:27only one in existence in the country
  1266. 41:29that's located on an island platform. A
  1267. 41:31little bit tenuous, but a wooden tea
  1268. 41:33room on an island platform is now unique
  1269. 41:35in the country. So that's actually quite
  1270. 41:37an important part of the listing as
  1271. 41:38well.
  1272. 41:39Elements that are listed but not part of
  1273. 41:41the station, so the goods goods
  1274. 41:43warehouse adjacent and the goods wagon
  1275. 41:45lift on the side are listed. Grade two
  1276. 41:48listed but separate listing.
  1277. 41:50And then there was a tongue-in-cheek
  1278. 41:51element that for a while all the
  1279. 41:53redundant class 1142s were were stable
  1280. 41:56there. So somebody had a joke that
  1281. 41:57somebody would try and list those as
  1282. 41:58well.
  1283. 42:01So developing layouts for Huddersfield,
  1284. 42:03we've got four tracks coming in. So the
  1285. 42:05first option is just retain what we've
  1286. 42:06already got. Let's keep the the bays in
  1287. 42:08the middle, try and make them a little
  1288. 42:09bit longer,
  1289. 42:10and keep the the platform arrangement
  1290. 42:12kind of as it is. However, this
  1291. 42:13instance, we've got the up and down main
  1292. 42:15through the bottom two through
  1293. 42:16platforms, and all the stopping services
  1294. 42:19in both directions using one line
  1295. 42:21through through all the through stopping
  1296. 42:22services using one line at the north of
  1297. 42:24the station. Operationally very
  1298. 42:26restrictive and that that wasn't
  1299. 42:28continued.
  1300. 42:31So same again but add a through
  1301. 42:34platform. So we've now got two fast
  1302. 42:36through fast platforms on the south, two
  1303. 42:38through slow platforms on the north,
  1304. 42:40and two bays in the center of the
  1305. 42:42station.
  1306. 42:43And that's trying to keep the the
  1307. 42:46rooms up to to to make room for
  1308. 42:47lengthening the platforms.
  1309. 42:49The one pro main problem with that is
  1310. 42:51the size of the second train shed, the
  1311. 42:53smaller train shed at Huddersfield. So
  1312. 42:55that's a photograph from the early 1980s
  1313. 42:57before they demolished
  1314. 42:59the eastern half of the train shed. It
  1315. 43:02did actually extend over the bay
  1316. 43:03platform. So the columns supporting the
  1317. 43:05small train shed are roughly 2 m from
  1318. 43:07the platform edge. So way below the
  1319. 43:09minimum of two and a half, and nowhere
  1320. 43:11near the 3.3 m we need to get a ramp in
  1321. 43:14there to to remove
  1322. 43:15mobility impaired persons from from the
  1323. 43:18train. So extending
  1324. 43:20removing the tea room and extending the
  1325. 43:22bays in there would have been
  1326. 43:23very difficult from a consent from a
  1327. 43:25from a
  1328. 43:26compliance perspective because of
  1329. 43:28because of those columns. And also the
  1330. 43:30roof the the shed roof is significantly
  1331. 43:32lower, so it would also be a bit of a
  1332. 43:34challenge to get your your wires
  1333. 43:35underneath there as well.
  1334. 43:37So that option was discounted. So the
  1335. 43:40two versions they are similar to what we
  1336. 43:42what we've adopted, but basically two
  1337. 43:44four through platforms with a a single
  1338. 43:46west facing bay on the north end. I've
  1339. 43:48I've ignored Penistone platform for the
  1340. 43:50time being. I'll come back to that in a
  1341. 43:51moment. But in essence, four through
  1342. 43:54platforms and a bay to the north. So
  1343. 43:56this version is to have two fast
  1344. 43:59platforms to the south. So up down fast
  1345. 44:02at the south, and up down slow at the
  1346. 44:03north. Similar version where you've got
  1347. 44:05the up fast and up slow at the bottom,
  1348. 44:07and the up fast and up slow at the top.
  1349. 44:09So just a different way of arranging it.
  1350. 44:12And that's the layout that we we ended
  1351. 44:14up with.
  1352. 44:16I'll talk about why there's so much S&C
  1353. 44:19in a moment because there was quite
  1354. 44:20quite a lot of effort we had to put into
  1355. 44:22justify
  1356. 44:23providing that and keeping it.
  1357. 44:26But that's the layout we've got. So
  1358. 44:27there's various various elements of the
  1359. 44:30layout that are quite important. So the
  1360. 44:32ladder from the top right that runs all
  1361. 44:33the way across,
  1362. 44:35point of that is to try and get
  1363. 44:37get that in at 40 mph. So that was one
  1364. 44:39of the main objectives. We ended up
  1365. 44:41trying to turn the dies all the west end
  1366. 44:43S&C at 40. But that ladder specifically
  1367. 44:45to try and get freight trains through
  1368. 44:47the station. So up freight trains
  1369. 44:49towards Manchester through the stations
  1370. 44:50as quickly as we can.
  1371. 44:52So the only one line that high speed
  1372. 44:53through the station is platform two.
  1373. 44:55Currently platform one, we'll renumber
  1374. 44:57them so that they're in geographical
  1375. 44:58order.
  1376. 44:59Um
  1377. 45:00So platform two is the only high speed
  1378. 45:03line through the station in the up
  1379. 45:04direction. So we want to be able to get
  1380. 45:06the trains across the layout, freight
  1381. 45:07trains across the layout, through
  1382. 45:09platform two at 40 mph, and hit the
  1383. 45:11bottom of the bank up to Standedge at
  1384. 45:13the highest possible speed. Because at 1
  1385. 45:15in 105 grade, and whatever speed those
  1386. 45:17trains hit the bottom of the hill, they
  1387. 45:18tend to be still doing at the top of the
  1388. 45:20hill. They can't accelerate because of
  1389. 45:22the weight of the train on on that
  1390. 45:23grade. So it's important we try and get
  1391. 45:25that train through the station quickly.
  1392. 45:28Hence that ladder.
  1393. 45:29There's one high speed
  1394. 45:31crossover in the layout. So coming out
  1395. 45:33of platform four going from left to
  1396. 45:34right. That's a 60 mph crossover. That
  1397. 45:38is
  1398. 45:39basically on a 1 in 100 falling
  1399. 45:41gradient. An electric train can
  1400. 45:42accelerate to 60 mph very quickly. It
  1401. 45:45can accelerate to 40 in pretty much
  1402. 45:46their own length.
  1403. 45:47So that one crossover in the middle of
  1404. 45:49the layout is to allow a fast train, a
  1405. 45:51down down Leeds
  1406. 45:53fast train to come out platform four and
  1407. 45:55have unrestricted acceleration coming
  1408. 45:57out of the station. It's basically can
  1409. 45:58floor it and just keep going until he's
  1410. 46:00got up to the full line speed of 100
  1411. 46:02mph.
  1412. 46:05And that's the layout of the station
  1413. 46:07that we ended up with. So
  1414. 46:09I mentioned the Penistone line. So we've
  1415. 46:11got Penistone platform, four car
  1416. 46:12platform bottom left.
  1417. 46:14Looks to be longer than that.
  1418. 46:16That image.
  1419. 46:17And then all the remainder of the
  1420. 46:18platforms are all all eight car
  1421. 46:20platforms. Eight times 24 m was the
  1422. 46:23remit. It's a generic DFT remit. The
  1423. 46:26trains that will actually be using them
  1424. 46:28are six times 24 for stopping services,
  1425. 46:31and for what currently five but in the
  1426. 46:33future seven car 802s which is seven
  1427. 46:35times 26 m. So you've got seven times 26
  1428. 46:38m train using a eight times 24 m long
  1429. 46:41platform. I mean 200 m platform.
  1430. 46:44Once you add the allowances.
  1431. 46:46So we ended with four through platforms
  1432. 46:48and one bay platform, all 200 m in
  1433. 46:50length.
  1434. 46:52And you'll see on there that those
  1435. 46:53platforms are not straight, which has in
  1436. 46:56itself caused us some problems. So
  1437. 46:59the layout was actually particularly the
  1438. 47:00west end of the station was difficult to
  1439. 47:02design. So the original north tunnel,
  1440. 47:05Huddersfield north tunnel, the geometry
  1441. 47:07of that, you come out of the tunnel
  1442. 47:08feeds into the lowest of the platforms
  1443. 47:10at Huddersfield.
  1444. 47:12So we've got the the So when they
  1445. 47:14increased the size of the station and
  1446. 47:15four tracked it in the station, they
  1447. 47:17went to the north and the tunnels they
  1448. 47:18built the south tunnel. So we went to
  1449. 47:20the south at one end and the north
  1450. 47:21through the middle of the station. Which
  1451. 47:23creates a horrible dog leg through the
  1452. 47:24middle of the station to try try and fit
  1453. 47:26through.
  1454. 47:27So our constraint, you see that's the
  1455. 47:29proposed that's our current layout. So
  1456. 47:31we've got constraints of the tunnel and
  1457. 47:33the geometries
  1458. 47:35at the western end.
  1459. 47:37We've got the station and the listed tea
  1460. 47:39room in the middle. We've got the
  1461. 47:40viaduct pinch pulling it down at the
  1462. 47:42eastern end. And then we've got listed
  1463. 47:44goods shed at the top. So there's
  1464. 47:46various constraints in there that we had
  1465. 47:47to try and fit fit this layout through.
  1466. 47:50Now, we've had quite a lot of challenge
  1467. 47:51from from the talks about installing
  1468. 47:53curved platforms, and I'll talk about
  1469. 47:55the problems with dispatch in a moment.
  1470. 47:57But just to demonstrate what would have
  1471. 47:59been needed if if the talks had have got
  1472. 48:00their own way of having straight
  1473. 48:01platforms 200 m length, we'd have to
  1474. 48:03rebuild Huddersfield tunnel, wipe out
  1475. 48:05several listed structures, and and widen
  1476. 48:07the the viaduct at the other end. So
  1477. 48:11that's just demonstrate the quantum of
  1478. 48:12extra work that would be required to get
  1479. 48:14the fully desirable
  1480. 48:15platform, straight platforms.
  1481. 48:19So from a dispatch perspective,
  1482. 48:21not necessarily about compliance or
  1483. 48:23compliant platform,
  1484. 48:25radius on the platform is 1,000 m.
  1485. 48:28Um
  1486. 48:29RSSB generally not that fussed till you
  1487. 48:31go below 500.
  1488. 48:33As long as you've got good reason to
  1489. 48:34curve a platform, they will they will
  1490. 48:36generally accept that.
  1491. 48:37Um
  1492. 48:38but you really need to consider the
  1493. 48:40dispatch of a train. So the black the
  1494. 48:42lines that are on there, the black lines
  1495. 48:43that are on there, are lines of sight
  1496. 48:45from the very end of the platform. So if
  1497. 48:46you've got a 200 m long platform
  1498. 48:49on a 1,000 m radius
  1499. 48:52with a compliant 3.3 m wide platform,
  1500. 48:55you cannot
  1501. 48:57undertake guard dispatch of that train
  1502. 48:59because that that guard would have to be
  1503. 49:01stood 5 and a half meters from the
  1504. 49:02platform edge to be able to see the full
  1505. 49:04length of the train.
  1506. 49:05So even if you have a compliant radius,
  1507. 49:07you still can't dispatch a train.
  1508. 49:09So the 800 m is the version we've got in
  1509. 49:12Huddersfield station,
  1510. 49:15which has its own issues.
  1511. 49:17But to to make a platform capable of
  1512. 49:20being dispatched or a guard being able
  1513. 49:21to see the full length of the train, it
  1514. 49:22would need to be 2,000 m off ladder for
  1515. 49:24that to work for an eight car train.
  1516. 49:28So we have had to as I mentioned
  1517. 49:29dispatch issues at Huddersfield. So some
  1518. 49:31visualizations of platform five where
  1519. 49:33the platform is on the outside of the
  1520. 49:34curve. If you're stood on the platform,
  1521. 49:36that the guard in the middle of the
  1522. 49:37train cannot see the full length of the
  1523. 49:39train. So, that's looking towards Leeds.
  1524. 49:41That's looking towards Manchester.
  1525. 49:43So, we've created some um line of sight
  1526. 49:46plots. So, a uh seven-car Class 802
  1527. 49:50uh with different versions of the train
  1528. 49:51in different positions on the platforms.
  1529. 49:54Uh but we've got two lines for each of
  1530. 49:55the from from each end of the train. One
  1531. 49:57is the obscuration from the train
  1532. 49:59itself, and one is the obscuration from
  1533. 50:02platform furniture.
  1534. 50:04So, platforms four uh uh six at the top
  1535. 50:07and and four uh three down there. Where
  1536. 50:10the platform's on the inside of the
  1537. 50:11curve, that hatched area is where the
  1538. 50:13guard needs to stand he can see the full
  1539. 50:14length of the train from that location.
  1540. 50:16So, it's relatively easy, subject to how
  1541. 50:18overcrowded the platform is, uh to be
  1542. 50:20able to dispatch a train where where the
  1543. 50:22platform is on the inside of the curve.
  1544. 50:24Where it's on the outside of the curve
  1545. 50:25is a real problem.
  1546. 50:27Uh as you can see there, that hatched
  1547. 50:29area, if we zoom in on that that area,
  1548. 50:31is very small. And with all the the
  1549. 50:33furniture that we've got within the
  1550. 50:34station and the waiting shelters that we
  1551. 50:35do need to provide, there isn't actually
  1552. 50:37a place where the guard can stand and
  1553. 50:39see the length of the train.
  1554. 50:40So, we are forced at Huddersfield into
  1555. 50:43having assisted dispatch or station
  1556. 50:45staff like you got at York, station
  1557. 50:46staff assisting the dispatch of a train.
  1558. 50:48Um which has its own implications. It's
  1559. 50:51mainly the OPEX cost of having So, one
  1560. 50:53dispatch staff requires three members of
  1561. 50:55staff. So, Huddersfield now requires
  1562. 50:57three additional members of staff to
  1563. 50:58assist in dispatch dispatch of trains.
  1564. 51:03Similar issue at Morley. I mentioned
  1565. 51:04Morley being curved earlier on. So, a
  1566. 51:06sim- similar um line of uh line of sight
  1567. 51:09plot, but this one's in 3D.
  1568. 51:11Uh so, if I zoom in there, um
  1569. 51:14this this area here is the area where
  1570. 51:15you can see the full length of the
  1571. 51:16train. So, we deliberately made the
  1572. 51:18platform at uh Morley 5.5 m wide to a
  1573. 51:22dispatch. And then we filled the
  1574. 51:23platform up with furniture, so you then
  1575. 51:25couldn't see the length of the train
  1576. 51:26again. So, in this instance, the the
  1577. 51:28CCTV mast takes up reason- it's still
  1578. 51:31small, but reasonable sized area to this
  1579. 51:33tiny little sliver in here. So, with the
  1580. 51:35CCTV mast being placed where it was, we
  1581. 51:37could no longer dispatch a train at
  1582. 51:39Morley, which is an unstaffed station,
  1583. 51:40so that wasn't going to work. So, it was
  1584. 51:41a very late alteration to get that CCTV
  1585. 51:44mast moved out of the way, so we were
  1586. 51:46actually capable of dispatching a train.
  1587. 51:49Reality now, interestingly, looks really
  1588. 51:50bad on the 3D model in when you stand
  1589. 51:52there on site, it doesn't actually look
  1590. 51:54as bad in in reality than in in the
  1591. 51:56theoretical version. Uh but it was still
  1592. 51:59an issue, and if we'd have left that
  1593. 52:00mast there, then then we we would have
  1594. 52:01had issues. Uh we've also got OLE masts
  1595. 52:04that are not in yet on site, but um they
  1596. 52:06they will also uh cau- cause a cause a
  1597. 52:09constraint.
  1598. 52:10So, the green line at the back is if you
  1599. 52:11had your unconstrained version in the
  1600. 52:13middle of the platform uh where that
  1601. 52:15line of sight would have been.
  1602. 52:21I think.
  1603. 52:27So, performance.
  1604. 52:29So, we need more reliable trains.
  1605. 52:31So, performance generically means more
  1606. 52:33flexibility from operational
  1607. 52:35perspective. It's not only how do you
  1608. 52:36manage perturbation, but how do you
  1609. 52:38manage a perturbation, but how do you
  1610. 52:40manage a train running 5 minutes late?
  1611. 52:42How do you manage the conflicts between
  1612. 52:44different operational moves?
  1613. 52:48So, we'd love a flexible layout, so we'd
  1614. 52:50love to put back in what used to be at
  1615. 52:51Huddersfield. So, let's put uh double
  1616. 52:53junctions in everywhere and double
  1617. 52:55slips, and we can go anywhere from
  1618. 52:56anywhere, and everyone's happy. But
  1619. 52:58obviously, we're not we're not going to
  1620. 52:59be doing that. So,
  1621. 53:02um
  1622. 53:05What alterations do we need to make to
  1623. 53:06layout? So, that's the diagram I had up
  1624. 53:08a few minutes ago of the the the layout
  1625. 53:10that we ended up with following
  1626. 53:12development.
  1627. 53:13Now, as soon as Network Rail got route
  1628. 53:15and ti- uh signals got to look at the
  1629. 53:17layout, they had very different
  1630. 53:18opinions. So, that's the version that
  1631. 53:20works for a timetable, but it doesn't
  1632. 53:22help run trains on the perturbation. So,
  1633. 53:24if you've lost your slow lines for some
  1634. 53:26reason, and all your trains your your
  1635. 53:28terminate trains that need to terminate
  1636. 53:29at Huddersfield from Leeds have to come
  1637. 53:31on the fast lines, you can only get into
  1638. 53:33platforms two and three from fast lines.
  1639. 53:36So, from a perturbation perspective,
  1640. 53:37that doesn't really work. So,
  1641. 53:40we actually need two extra crossovers,
  1642. 53:42which now allows us to get from the up
  1643. 53:44fast all the way across into platform
  1644. 53:45five. We can't get into all platforms,
  1645. 53:47but we can at least get across to
  1646. 53:48platform five.
  1647. 53:50So, we needed two extra crossovers.
  1648. 53:52Now, um given that we're we we had the
  1649. 53:54layout fairly well locked down at that
  1650. 53:55point, that was quite fairly painful
  1651. 53:57discussion to add two crossovers and add
  1652. 54:00the cost associated with that. So, we we
  1653. 54:02made the decision at the time to add one
  1654. 54:03crossover and move a different one.
  1655. 54:06In moving that crossover, we lost a
  1656. 54:08parallel move, which at the time we
  1657. 54:10didn't think was particularly
  1658. 54:11significant, but as I'll come back to
  1659. 54:12shortly, uh turns out it is fairly
  1660. 54:14significant. So, uh that's the one
  1661. 54:16regret on the development of the layout
  1662. 54:18for Huddersfield is not moving that
  1663. 54:21crossover instead of adding a crossover.
  1664. 54:27So, the layout that we've got for
  1665. 54:29Huddersfield, this is this is the actual
  1666. 54:30version that's designed now, single line
  1667. 54:32diagram version, what we're we are
  1668. 54:33currently building.
  1669. 54:35Uh so, what have we got there? So, we
  1670. 54:37still got the the ladder running across,
  1671. 54:38so 35 points all the way through to 28
  1672. 54:41points there.
  1673. 54:42Uh ladder to get the freight trains
  1674. 54:43through platform two.
  1675. 54:46Um
  1676. 54:48Up right there, 36 points leads into um
  1677. 54:51stable facility, so we've got side talk
  1678. 54:54sidings. So, we've got four
  1679. 54:56uh 100 well, 350 m and one 200 m long
  1680. 54:59side siding for Northern to stable there
  1681. 55:02out-of-service trains. Those are they
  1682. 55:04are currently sidings at the north side
  1683. 55:06of the station, which are taken up by
  1684. 55:07the new platforms. So, we needed to
  1685. 55:09provide an alternate facility. That is
  1686. 55:11at Hillhouse on the right-hand side of
  1687. 55:12the screen. And the benefit is that that
  1688. 55:14facility actually faces the station, so
  1689. 55:15it's a single empty stock move from the
  1690. 55:17station to the sidings instead of out
  1691. 55:19onto the running lines, reversing, and
  1692. 55:21going back into the sidings as they do
  1693. 55:22today. So, stabling at the uh right-hand
  1694. 55:25side, fast lines to the north, fast li-
  1695. 55:28sorry, slow lines to the north, fast
  1696. 55:29lines to the south.
  1697. 55:31Got flexibility through the middle of
  1698. 55:32the station.
  1699. 55:33So, the the diagram I showed you earlier
  1700. 55:35with having an up uh up down up down
  1701. 55:38arrangement or up up down down
  1702. 55:39arrangement, this is actually the merger
  1703. 55:41of the two. The reason we've got the
  1704. 55:42extra S&C and the diamond in the middle
  1705. 55:44is that we can actually run on the
  1706. 55:45bottom two tracks, the top two tracks,
  1707. 55:47the outside two tracks, which I'll which
  1708. 55:49I'll show you in a moment.
  1709. 55:51Um
  1710. 55:54It'd be lovely to have extra tracks at
  1711. 55:56the west end of Huddersfield.
  1712. 55:58Uh I mentioned I said earlier I'd I'd
  1713. 56:00ignored talking about the Penistone
  1714. 56:01line, so you've got the Penistone line
  1715. 56:02coming in uh from Sheffield um
  1716. 56:06through Barnsley uh Penistone and
  1717. 56:09through into platform one. We did have
  1718. 56:11schemes that that that put an extra
  1719. 56:13appliance, or the up fast shared to the
  1720. 56:16Penistone line, and we squeezed an extra
  1721. 56:17track through there. To do with that
  1722. 56:19though,
  1723. 56:20uh I'd remove the the version at the
  1724. 56:22moment where the Penistone line is in
  1725. 56:23essence a completely independent railway
  1726. 56:26into an independent platform.
  1727. 56:28The Penistone line's
  1728. 56:29timetable is completely divorced from
  1729. 56:31TIU. If we merge those and run the up
  1730. 56:34fast on the Penistone line briefly,
  1731. 56:36you've now linked the Huddersfield
  1732. 56:38timetable with the Sheffield timetable.
  1733. 56:40The Sheffield timetable already doesn't
  1734. 56:41work, so then linking it with
  1735. 56:43Huddersfield as well will make
  1736. 56:44everything fall over. So, it's a very
  1737. 56:46deliberate choice to retain the existing
  1738. 56:48scenario of keeping the Penistone line
  1739. 56:50completely independent on a day-to-day
  1740. 56:52operation. Obviously, 16 points is for
  1741. 56:54empty stock moves to get get in and off,
  1742. 56:56and engineers trains to get in on and
  1743. 56:57off the branch. Um deliberate choice to
  1744. 57:00to keep those separate. So, how else
  1745. 57:03could we get an extra track through
  1746. 57:04through uh through the tunnels? Well,
  1747. 57:06set track through the north bore was
  1748. 57:08originally two tracks. Um I mentioned
  1749. 57:10earlier that um Standly Bridge and Scout
  1750. 57:14tunnels were small. Huddersfield north
  1751. 57:15bore is even smaller. It's absolutely
  1752. 57:17minuscule. In fact, it looks like a
  1753. 57:19single bore tunnel, so they ever had two
  1754. 57:21tracks through it. Uh it's in the order
  1755. 57:23of a meter track lower, 1 m track lower
  1756. 57:25to be able to put the second track
  1757. 57:26through there. Um
  1758. 57:27which is actually easy to bore a new
  1759. 57:29tunnel, I think, than than than to start
  1760. 57:30doing that. So, um
  1761. 57:33unlikely to ever get built, but the spur
  1762. 57:36on 21B there coming to platform five,
  1763. 57:38that's for two reasons that that's
  1764. 57:39there. One is passive provision that
  1765. 57:41that can actually run if you ever bore
  1766. 57:42in another single bore tunnel to the
  1767. 57:44north, you can actually connect it in.
  1768. 57:46Uh and the other one is when a train
  1769. 57:47coming into platform five
  1770. 57:50uh has a proper overrun, so it's it's uh
  1771. 57:52overrun beyond the signal doesn't
  1772. 57:54actually go onto
  1773. 57:55head-on conflicting move with the down
  1774. 57:57train entering the station. So, the uh
  1775. 57:59to have that little spur up to above the
  1776. 58:01stop allows a signal overrun to to to to
  1777. 58:04go straight on instead of into into the
  1778. 58:06path of an oncoming train.
  1779. 58:10So,
  1780. 58:11um
  1781. 58:13Small things make make differences.
  1782. 58:15Nam- naming of lines. So, to the west of
  1783. 58:19east of the station, you've got the up
  1784. 58:20down fast, up down Huddersfield fast on
  1785. 58:23the south, and the up and down
  1786. 58:24Huddersfield slow on the north. And it's
  1787. 58:25just the up and down Huddersfield where
  1788. 58:27you go down to the two-track section.
  1789. 58:29Because of how they were named to the
  1790. 58:30east of the station, originally, the
  1791. 58:32platforms were numbered as the up and
  1792. 58:34down Huddersfield fast and up and down
  1793. 58:36Huddersfield slow. However, platform
  1794. 58:38four, which was labeled the up slow, was
  1795. 58:41intended to be used by the down fast
  1796. 58:43services.
  1797. 58:44So, although it seems nothing, as soon
  1798. 58:46as the timetables got hold of that, they
  1799. 58:47see the names and assume that the trains
  1800. 58:49have to go through those tracks. So,
  1801. 58:51they then turn around and say, "We can't
  1802. 58:52get this timetable to work." This is,
  1803. 58:54"Of course you can. We've got loads of
  1804. 58:55flexibility in the layout." "No, it no,
  1805. 58:56it doesn't work." And it's because
  1806. 58:58they've taken the track labels as a as
  1807. 58:59the down fast having to have the down
  1808. 59:01fast train running through it. Um so,
  1809. 59:03there's another battle. It's amazing how
  1810. 59:05difficult it is to get simple things
  1811. 59:06changed. But we've now got the up and
  1812. 59:07down fasts and slows to the west of the
  1813. 59:09station, we've got platform two line,
  1814. 59:11platform three line, four line, five
  1815. 59:13line through the station, and then goes
  1816. 59:14through and out of Huddersfield uh
  1817. 59:16purely to to stop that confusion in the
  1818. 59:18future.
  1819. 59:20So, what we've got on screen, uh green
  1820. 59:22uh fast services, blue uh
  1821. 59:24stopping services. So, how do we map
  1822. 59:26different versions of how we use
  1823. 59:28Huddersfield station?
  1824. 59:30So, um down fast train uh running
  1825. 59:33through platform four back over 30
  1826. 59:34points back onto the onto the down fast
  1827. 59:37line. So, 30 points is the fast turnout
  1828. 59:39that I mentioned earlier for the
  1829. 59:40unrestricted acceleration of the train
  1830. 59:42out of the station. Up fast trains
  1831. 59:44running through platform two with the
  1832. 59:46Manchester stopper turning having a
  1833. 59:48center turn back in platform three and
  1834. 59:50everything coming from the west all
  1835. 59:51filtering across into platforms five and
  1836. 59:53six. So, that's assuming we've got
  1837. 59:55what's called a split stopper
  1838. 59:56arrangement where the Manchester
  1839. 59:58Huddersfield stopper is different from
  1840. 1:00:00the Huddersfield to Leeds stopper. There
  1841. 1:00:02was a version where that is a through
  1842. 1:00:03stopping service that runs all the way
  1843. 1:00:05from Manchester through to Leeds or
  1844. 1:00:07Manchester through to York.
  1845. 1:00:09In that scenario,
  1846. 1:00:11platform three now is used for all up
  1847. 1:00:14stopping services and platform five for
  1848. 1:00:16all down stopping services and then
  1849. 1:00:18platform six for the Bradford train
  1850. 1:00:19which always always terminates at
  1851. 1:00:21Huddersfield. So, you've got that
  1852. 1:00:22flexibility. Now, in running that
  1853. 1:00:25through service,
  1854. 1:00:26at 33 points here, you've got your up
  1855. 1:00:29slow crossing your down fast services.
  1856. 1:00:32So, you've got an operational conflict
  1857. 1:00:34in the throat of the station.
  1858. 1:00:37Now, it's deemed better to manage it at
  1859. 1:00:40that end of the station because the fast
  1860. 1:00:41train's going to take priority. If you
  1861. 1:00:43have to stop a terminating stopping
  1862. 1:00:44services outside the station and hold it
  1863. 1:00:47for for a few minutes before you let it
  1864. 1:00:48in, it's not as big a deal as as the
  1865. 1:00:50impact of stopping a fast train that
  1866. 1:00:52then runs up to Edinburgh because
  1867. 1:00:53they're not going to affect
  1868. 1:00:55delays around the country as high for
  1869. 1:00:56that. However, the flexibility I
  1870. 1:00:59mentioned in the layout at the west end
  1871. 1:01:01means that if that stopping train is due
  1872. 1:01:03to get into the station before the down
  1873. 1:01:05fast leaves and that stopping train is
  1874. 1:01:07running late, you've now got that
  1875. 1:01:08conflict of both want to cross the
  1876. 1:01:09junction at the same time. The signalers
  1877. 1:01:11should know that within sufficient
  1878. 1:01:14advanced warning. So, because of the
  1879. 1:01:16flexibility in layout, you actually got
  1880. 1:01:18the option to swap those around at the
  1881. 1:01:19last minute. You swap the two trains on
  1882. 1:01:21the opposite face of the same platform.
  1883. 1:01:23So, you haven't got any passenger
  1884. 1:01:24management issues. They just go into the
  1885. 1:01:25opposite face of the same platform. You
  1886. 1:01:27now move that conflict from the east end
  1887. 1:01:29of the station to the west end of the
  1888. 1:01:30station. So, you've got the
  1889. 1:01:32the immediate flexibility in the day to
  1890. 1:01:34manage slightly out of sequence trains
  1891. 1:01:37and order that
  1892. 1:01:38that relocate that conflicting
  1893. 1:01:41operational conflict.
  1894. 1:01:44Freight trains mentioned earlier. So,
  1895. 1:01:46solid blue lines is the intended
  1896. 1:01:48route for freight and then the dotted
  1897. 1:01:50line is the alternative route. So, I
  1898. 1:01:51mentioned coming across the ladder 33 28
  1899. 1:01:54points through platform two. Can go
  1900. 1:01:55through platform three, but the where
  1901. 1:01:57the west end of platform three is 25
  1902. 1:01:59mph. So, you'll have that hit on on uh
  1903. 1:02:03uh train speed which will then compound
  1904. 1:02:05itself going up the hill because it will
  1905. 1:02:07pretty much stay at that speed.
  1906. 1:02:11So, that's day-to-day intended use. What
  1907. 1:02:13do you do under perturbation? So, you've
  1908. 1:02:15got unplanned failures. So, what happens
  1909. 1:02:16if you lose your slow lines? Where do
  1910. 1:02:18you run all your fast and slow services?
  1911. 1:02:20I'm not going to go in these as much
  1912. 1:02:21detail, but we looked at how how you
  1913. 1:02:23cope with the fast slow lines are
  1914. 1:02:24closed. If the fast lines are closed,
  1915. 1:02:26where do you send your services?
  1916. 1:02:28Um on a night time plan closure, slow
  1917. 1:02:31lines are closed, you can run it as a
  1918. 1:02:32two track railway. Fast lines are
  1919. 1:02:33closed, you can use in slows as a two
  1920. 1:02:35track railway. So, you've got all that
  1921. 1:02:36flexibility there. If you lost
  1922. 1:02:38everything at the Leeds end and you have
  1923. 1:02:40to terminate all Manchester trains, I
  1924. 1:02:43predominantly use platforms three and
  1925. 1:02:44four, but you can come into five, run up
  1926. 1:02:46to Hillhouse siding and come back into
  1927. 1:02:48platform two and head back towards
  1928. 1:02:49Manchester. So, lots of flexibility
  1929. 1:02:51there. And then again, if you lose the
  1930. 1:02:52Manchester trains, how do you manage all
  1931. 1:02:54your fast and stops and send stoppers
  1932. 1:02:55and send them back the other way?
  1933. 1:02:57So, all the different scenarios, the
  1934. 1:02:59layout has a lot of flexibility within
  1935. 1:03:01it
  1936. 1:03:03um
  1937. 1:03:05to manage perturbation. So,
  1938. 1:03:08mentioned flexibility. So, performance
  1939. 1:03:10is all about flexibility. You need to be
  1940. 1:03:12able to do different moves at the same
  1941. 1:03:14time. And again, this is quite
  1942. 1:03:15complicated, so I'm not I'm not going to
  1943. 1:03:16dwell on I'll just pick up on a couple
  1944. 1:03:18of ones. So, again, green in this
  1945. 1:03:19instance green is a down service, so
  1946. 1:03:21towards Leeds and red is a Manchester
  1947. 1:03:24bound service. So, all the solid lines
  1948. 1:03:28are moves that can happen at the same
  1949. 1:03:30time. So, you can have an up train in
  1950. 1:03:31red through platform two running all the
  1951. 1:03:33way through the same time as a down
  1952. 1:03:35train enters platform five at the same
  1953. 1:03:37time as another down train can leave
  1954. 1:03:39platform six. Lots of different versions
  1955. 1:03:43trains can
  1956. 1:03:44leave either five or six at the same
  1957. 1:03:46time as coming into four
  1958. 1:03:48and so on and so forth. There's lots of
  1959. 1:03:49different options there. So, you can
  1960. 1:03:51pretty much do nearly every parallel
  1961. 1:03:53move that you would want to do with one
  1962. 1:03:55exception because of the 22 points being
  1963. 1:03:58so close to the station, you cannot
  1964. 1:04:00leave platform two at the same time as
  1965. 1:04:01an up train is is entering platform
  1966. 1:04:03sorry, cannot leave platform three at
  1967. 1:04:05the same time as a an up train is
  1968. 1:04:06entering platform two. You have to wait
  1969. 1:04:08for that train to have stopped and be
  1970. 1:04:10timed out in platform two before three
  1971. 1:04:11can be released. So, that's the only
  1972. 1:04:13thing really that the layout doesn't do.
  1973. 1:04:15Otherwise, you've got the flexibility in
  1974. 1:04:16the overlaps at the end of the station
  1975. 1:04:18to manage pretty much anything to happen
  1976. 1:04:20at the same time.
  1977. 1:04:23So, I mentioned the missed opportunity
  1978. 1:04:25of the crossover. So, um removing the
  1979. 1:04:28crossover the facing crossover just at
  1980. 1:04:31the right end of platforms two and three
  1981. 1:04:33means that if you've got a down train
  1982. 1:04:35the green line leaving platform four the
  1983. 1:04:38same time as train is either in or
  1984. 1:04:40leaving platform two,
  1985. 1:04:42you cannot get into three at the same
  1986. 1:04:44time because of the the down train going
  1987. 1:04:46in the opposite direction. So, you can't
  1988. 1:04:47use 34 points because of the there's a a
  1989. 1:04:50down fast train going over it. So,
  1990. 1:04:51that's where the the relocated crossover
  1991. 1:04:55was was was probably a bit of an error
  1992. 1:04:58in losing that. Um there's a very good
  1993. 1:05:01chance that we will now have to do a
  1994. 1:05:02subsequent stage to
  1995. 1:05:05add that crossover back in. So, we've
  1996. 1:05:07got a nice lovely layout with all the
  1997. 1:05:09S&C wonderfully separated 20 m
  1998. 1:05:10separation between all the S&C units all
  1999. 1:05:13at a consistent 30 or 40 mph and then
  2000. 1:05:16we're going to have to squeeze in this
  2001. 1:05:17horrible little 25 mph crossover on a
  2002. 1:05:19curve at the entrance of the platform to
  2003. 1:05:22get back the the the parallel moves that
  2004. 1:05:24we probably should have resisted losing
  2005. 1:05:26a lot lot harder than we did.
  2006. 1:05:31So, how we staging TIU? So, September of
  2007. 1:05:35next year is the first major blockade at
  2008. 1:05:37Huddersfield. Huddersfield gets closed
  2009. 1:05:38for one month. During that month, we
  2010. 1:05:40complete the slow lines. So, everything
  2011. 1:05:42in black there will be complete at the
  2012. 1:05:45end of the blockade or should be
  2013. 1:05:46complete at the end of the blockade in
  2014. 1:05:47September next year.
  2015. 1:05:49So, that includes a temporary platform
  2016. 1:05:51at
  2017. 1:05:51Hillhouse on the right hand side which
  2018. 1:05:55is intended to manage stopping services.
  2019. 1:05:58So, the station itself is is reduced to
  2020. 1:06:00a two platform through station. So, that
  2021. 1:06:02can pick up all your your fast trains as
  2022. 1:06:03they do today, but there's no way to
  2023. 1:06:05terminate a stopping service because we
  2024. 1:06:07take out of action all the north end of
  2025. 1:06:08the station and over the course of the
  2026. 1:06:10year completely reconstruct it. So, we
  2027. 1:06:12build the slow lines
  2028. 1:06:14as far as 32 points with a temporary
  2029. 1:06:16alignment to get across into platforms
  2030. 1:06:17two and three and operate Huddersfield
  2031. 1:06:20as a two platform station with stopping
  2032. 1:06:22services intended to use the
  2033. 1:06:24Huddersfield Hillhouse platform.
  2034. 1:06:27There's a good chance now that
  2035. 1:06:29the TOCs don't want the hassle of having
  2036. 1:06:31to get passengers from Hillhouse to the
  2037. 1:06:33main station. We're probably just going
  2038. 1:06:35to divert all trains via the Calder
  2039. 1:06:37Valley and we'll just bus people the
  2040. 1:06:38extra two miles that it takes to get
  2041. 1:06:40from Brick House. So, you'll basically
  2042. 1:06:42you want to go to Huddersfield, you get
  2043. 1:06:43off at Brick House and get a bus bus to
  2044. 1:06:45Huddersfield. So, although we've
  2045. 1:06:47designed in the capability to that
  2046. 1:06:49platform, it's probably not going to get
  2047. 1:06:51built because of the the way that they
  2048. 1:06:52want to operate the diverted services.
  2049. 1:06:54So, that happens September next year.
  2050. 1:06:57You've got a year for the station to be
  2051. 1:07:00rebuilt. I think it's September the
  2052. 1:07:02following year, James. Is that correct?
  2053. 1:07:04It's roughly a year later. Might be
  2054. 1:07:05Christmas, so might be slightly over a
  2055. 1:07:07year where the rest of the station gets
  2056. 1:07:09commissioned. So, we've now got all the
  2057. 1:07:11platforms, all the west end layout. So,
  2058. 1:07:13this is the second one month blockade.
  2059. 1:07:15So, we've got the final station, but
  2060. 1:07:16without the fast lines commissioned. So,
  2061. 1:07:19we've got all the platforms, but we're
  2062. 1:07:20only feeding in now. The layout isn't
  2063. 1:07:21designed to have parallel moves with
  2064. 1:07:23every everything coming in constantly
  2065. 1:07:25off two platforms. It does work, but
  2066. 1:07:27it's it's more constrained than you've
  2067. 1:07:28got on the end end state layout.
  2068. 1:07:30I've hidden all the slides associated
  2069. 1:07:31with that cuz I thought you'd be getting
  2070. 1:07:32bored by now.
  2071. 1:07:35So, that's it for Huddersfield station.
  2072. 1:07:37We've uh
  2073. 1:07:39Hopefully, that demonstrates the volume
  2074. 1:07:40of effort that we're actually putting
  2075. 1:07:42into coming up with the layout that
  2076. 1:07:43we've got.
  2077. 1:07:44Um it's
  2078. 1:07:46at least six years worth of work to get
  2079. 1:07:48to the point we're at now. Um so,
  2080. 1:07:51nothing happens quickly on the railway,
  2081. 1:07:52but that's been constant work for those
  2082. 1:07:54six years. Two week two year chunk of
  2083. 1:07:56that was all Transport Works Act order
  2084. 1:07:59in the middle which we got roughly a
  2085. 1:08:01year ago. So, we've got the Transport
  2086. 1:08:02Works Act order signed off. So,
  2087. 1:08:04they're they're starting in earnest on
  2088. 1:08:05site now which I'll show you a a few
  2089. 1:08:07progress photographs at the end of the
  2090. 1:08:09presentation.
  2091. 1:08:10But, some of the other development items
  2092. 1:08:13stations. So, Deighton station which is
  2093. 1:08:15location beyond there, um
  2094. 1:08:17we were having to re completely rebuild
  2095. 1:08:19the station because the the current
  2096. 1:08:21tracks in the station in the middle of
  2097. 1:08:23the four track formation. So, to get
  2098. 1:08:24four tracks through there, we need to
  2099. 1:08:25shuffle everything around. So, we looked
  2100. 1:08:27at numerous different alternatives for
  2101. 1:08:29the station. Deighton was a 1980s
  2102. 1:08:33local authority built platform
  2103. 1:08:35um
  2104. 1:08:37that replaced the original Bradley
  2105. 1:08:39station which was at location H on
  2106. 1:08:41there. So,
  2107. 1:08:42and Deighton is one of the lowest used
  2108. 1:08:45stations usage stations in West
  2109. 1:08:47Yorkshire. So, we thought, well, okay,
  2110. 1:08:49we have to rebuild Deighton station. Is
  2111. 1:08:51Deighton station the right place to to
  2112. 1:08:52actually have the station? So, there's
  2113. 1:08:54quite an exhaustive option selection
  2114. 1:08:56process that looked at numerous
  2115. 1:08:57different locations.
  2116. 1:08:59We actually ended up back with
  2117. 1:09:01rebuilding station where it is now, but
  2118. 1:09:02we did go through quite an exhaustive
  2119. 1:09:04process to to determine the best place
  2120. 1:09:06for that.
  2121. 1:09:08And that's what our station looks like.
  2122. 1:09:09So,
  2123. 1:09:11at the moment the tracks are roughly
  2124. 1:09:13where the right hand lift shaft is
  2125. 1:09:14through the middle, two platforms and
  2126. 1:09:17one ramp long ramp coming down from the
  2127. 1:09:19the over bridge to to each of the
  2128. 1:09:20platforms. So, we rebuild the bridge,
  2129. 1:09:22the
  2130. 1:09:23retaining wall on the left hand side
  2131. 1:09:25gets cut back at least two or three
  2132. 1:09:26meters to make room for for slotting the
  2133. 1:09:29platforming in the middle where you
  2134. 1:09:30never had a platform originally
  2135. 1:09:32and with access only from the south side
  2136. 1:09:35of the railway instead of one one either
  2137. 1:09:37side of the bridge.
  2138. 1:09:41When we get to Heaton Lodge, the fast
  2139. 1:09:42lines on the south all the way through
  2140. 1:09:45the curve at Heaton Lodge is relatively
  2141. 1:09:47tight radius 70 was currently 70 miles
  2142. 1:09:49an hour to push it to its limits you get
  2143. 1:09:50about 80 miles an hour.
  2144. 1:09:53If you got the corner off we can get up
  2145. 1:09:54to 100 miles an hour.
  2146. 1:09:56So given that we've got capability of
  2147. 1:09:57110 between Ravensthorpe and Heaton
  2148. 1:09:59Lodge to the right hand side, 100
  2149. 1:10:01through here. It was actually chosen to
  2150. 1:10:04match through Deighton.
  2151. 1:10:06So Deighton is very tight reverse curves
  2152. 1:10:08through Deighton the maximum you can
  2153. 1:10:09ever get through Deighton is 100 miles
  2154. 1:10:11an hour so there's not a lot point going
  2155. 1:10:12more much more than 100 here. So we did
  2156. 1:10:14a 100 curve we did look at 110 115
  2157. 1:10:17options but this was the optimum from a
  2158. 1:10:19from a
  2159. 1:10:20earthworks perspective and impact on
  2160. 1:10:22structures particularly the river bridge
  2161. 1:10:24on the south end where we if we go any
  2162. 1:10:26flatter with the radius we start we end
  2163. 1:10:28up triggering the rebuilding of
  2164. 1:10:30another bridge.
  2165. 1:10:32Um
  2166. 1:10:34Interestingly this is one of our
  2167. 1:10:35cheapest interventions for line speed
  2168. 1:10:39benefit on the route so
  2169. 1:10:41um
  2170. 1:10:44From the business case perspective the
  2171. 1:10:45value of a second on west of Leeds
  2172. 1:10:48is roughly two million pounds per
  2173. 1:10:51second.
  2174. 1:10:53Okay.
  2175. 1:10:54As a rule of thumb it's between one and
  2176. 1:10:55two. If any intervention comes in at
  2177. 1:10:57less than one million pounds per every
  2178. 1:10:59second that that that that scheme
  2179. 1:11:02generates then it's an absolute
  2180. 1:11:04no-brainer you select that option. If
  2181. 1:11:06it's worse than three it's a no-brainer
  2182. 1:11:08you don't build it it's never going to
  2183. 1:11:09have a business case. If it's in between
  2184. 1:11:10it's subjective and that's where you
  2185. 1:11:12have to put more effort into the option
  2186. 1:11:13selection process to prove it.
  2187. 1:11:15This out of all the schemes on the route
  2188. 1:11:16worked out at the time about 300,000
  2189. 1:11:18pounds per second.
  2190. 1:11:21It was an off-line earthworks scheme
  2191. 1:11:22there wasn't a lot of railway systems
  2192. 1:11:24associated with it. Um so it was it was
  2193. 1:11:27actually one of the cheaper ones. We've
  2194. 1:11:28tried numerous times to say well let's
  2195. 1:11:30just stick on the boundary and keep it
  2196. 1:11:31at 80 miles an hour but those seconds
  2197. 1:11:33are
  2198. 1:11:34quite cheap seconds so looks like a big
  2199. 1:11:36scheme but it's actually one of the
  2200. 1:11:37better better schemes on TIU.
  2201. 1:11:41Mirfield station so we're actually
  2202. 1:11:45looking south here so the fast lines are
  2203. 1:11:47on the far side on the right hand side.
  2204. 1:11:50So Mirfield is currently a three
  2205. 1:11:52platform station
  2206. 1:11:54platform one on the left then two and
  2207. 1:11:55then three on the far side. Two isn't
  2208. 1:11:57actually used at the uh
  2209. 1:11:59previously.
  2210. 1:12:00Um so what we're doing is getting rid of
  2211. 1:12:02the
  2212. 1:12:03down the up loop get rid of the platform
  2213. 1:12:06everything goes on the up down slow so
  2214. 1:12:08we it's currently a three platform
  2215. 1:12:09station which becomes a two platform
  2216. 1:12:10station cuz all the stopping trains are
  2217. 1:12:12on the slow lines.
  2218. 1:12:16Ravensthorpe grade separated junction um
  2219. 1:12:20so we're actually going entirely off
  2220. 1:12:21track so called the bridges we ignore
  2221. 1:12:23the existing embankment we actually
  2222. 1:12:25overshoot the curve with the fast lines
  2223. 1:12:27get 110 miles an hour the slow lines
  2224. 1:12:29coming either side that follow it type
  2225. 1:12:31four tracks over the called the
  2226. 1:12:33navigation and the river Calder tie down
  2227. 1:12:35back down to two tracks at Deighton
  2228. 1:12:37junction
  2229. 1:12:38then we straighten out the reverse curve
  2230. 1:12:40at
  2231. 1:12:41Thornhill Road where there's a double
  2232. 1:12:43reverse in there so we cut cut that
  2233. 1:12:44corner off and then up to Dewsbury
  2234. 1:12:46station after Dewsbury it drops down to
  2235. 1:12:4890 then to 75 miles an hour as you go
  2236. 1:12:51back into the the existing geometry but
  2237. 1:12:53we've got a big chunk of 110 100 and 110
  2238. 1:12:55mile an hour between Huddersfield and
  2239. 1:12:58Dewsbury.
  2240. 1:13:02Mentioned Deighton junction
  2241. 1:13:04unusual unusual name to have various
  2242. 1:13:07people don't know where that name comes
  2243. 1:13:09from. So originally it was proposed as
  2244. 1:13:11Westtown junction. So Westtown is is the
  2245. 1:13:14the area within within Dewsbury but
  2246. 1:13:17equally nobody knew where where Westtown
  2247. 1:13:19was either so that
  2248. 1:13:20ops tend to like a location name
  2249. 1:13:23something location specific for a
  2250. 1:13:24junction
  2251. 1:13:26but Westtown was fairly generic in that
  2252. 1:13:27nobody on the railways knows where
  2253. 1:13:28Westtown is anyway. So it was decided to
  2254. 1:13:32call it Deighton junction and the
  2255. 1:13:33viaduct over the river is also going to
  2256. 1:13:35be called Deighton viaduct. That was
  2257. 1:13:37actually in recognition of
  2258. 1:13:39Stuart Baker. So
  2259. 1:13:42most of you probably haven't heard of
  2260. 1:13:43Stuart Baker but Stuart Baker was a
  2261. 1:13:45civil servant former railway man
  2262. 1:13:48area operations manager on the London
  2263. 1:13:50Northwestern when it was London Bridge
  2264. 1:13:52Railways worked for the Department for
  2265. 1:13:54Transport for many years and he was the
  2266. 1:13:56reason TIU is happening. And he got it
  2267. 1:13:59to the point
  2268. 1:14:00as he said he got it to the point where
  2269. 1:14:02the the government couldn't back out.
  2270. 1:14:05So it was it was Stuart that got us over
  2271. 1:14:07the line. Unfortunately Stuart had a
  2272. 1:14:09stroke about five years ago now in a TIU
  2273. 1:14:12meeting
  2274. 1:14:13never went back to work and died of a
  2275. 1:14:15heart attack about two years later. And
  2276. 1:14:17he he was the linchpin within the
  2277. 1:14:19Department for Transport he was the man
  2278. 1:14:20that really knew railways and knew what
  2279. 1:14:22was needed. So it was a big big loss but
  2280. 1:14:25due to his due to his
  2281. 1:14:28service over the years
  2282. 1:14:29in in memory of him we've actually
  2283. 1:14:31decided or the the the route director
  2284. 1:14:33Rob McIntosh
  2285. 1:14:34decided that we we would name the
  2286. 1:14:36junction after him. There's no better
  2287. 1:14:38accolade for a railway engineer to have
  2288. 1:14:39a bit of infrastructure named after them
  2289. 1:14:41I mean that's a pretty cool one I quite
  2290. 1:14:43like to have a Hog's junction somewhere
  2291. 1:14:45at some point I don't think that's going
  2292. 1:14:46to happen.
  2293. 1:14:49Ravensthorpe station so you can see the
  2294. 1:14:51flyover on the right hand side so the
  2295. 1:14:52fast lines on the right hand side slow
  2296. 1:14:54lines
  2297. 1:14:56the plat the station is actually
  2298. 1:14:57currently on the Leeds lines just at the
  2299. 1:14:59top top of the picture. We've made the
  2300. 1:15:00choice to move it to the other side of
  2301. 1:15:02the junction so you can actually pick up
  2302. 1:15:03the Wakefield route as well. So any
  2303. 1:15:05leads to Wakefield or more importantly
  2304. 1:15:07the Grand Central London trains can now
  2305. 1:15:09stop at Ravensthorpe as well as
  2306. 1:15:11just stopping at
  2307. 1:15:13Mirfield so it relieves some of the
  2308. 1:15:14pressure on Mirfield in the parking in
  2309. 1:15:16the Mirfield area. So we just create a
  2310. 1:15:17parking nightmare here instead probably
  2311. 1:15:19but that's uh
  2312. 1:15:20chance. And also there's a four and a
  2313. 1:15:23half thousand
  2314. 1:15:25house housing development just off to
  2315. 1:15:26the right hand side proposed area so
  2316. 1:15:29having a better connected station that
  2317. 1:15:31can covers more destinations was an
  2318. 1:15:33important part of that.
  2319. 1:15:37So another view of the grade separation
  2320. 1:15:38in the box. It's a picture of the box
  2321. 1:15:40itself so we've got the green lines of
  2322. 1:15:42the fast lines going over the top then
  2323. 1:15:44underneath you've got the two lines
  2324. 1:15:45going up to Wakefield and the um
  2325. 1:15:49Oakenshaw line coming from Leeds
  2326. 1:15:50underneath so the junction is actually
  2327. 1:15:52the diamond of the junction is actually
  2328. 1:15:53underneath underneath the the
  2329. 1:15:55intersection underneath the box.
  2330. 1:15:58Which
  2331. 1:15:59has its disadvantages but given that
  2332. 1:16:00it's a switch diamond the switch
  2333. 1:16:02diamonds don't like being in the sun
  2334. 1:16:03it's actually beneficial to actually
  2335. 1:16:04have it hidden underneath the box so
  2336. 1:16:07although it's not the best place to put
  2337. 1:16:08it it actually has
  2338. 1:16:09indirect benefits of locating there cuz
  2339. 1:16:11it keeps it out of direct sunlight.
  2340. 1:16:14So I mentioned missing Calder bridges
  2341. 1:16:16the two Calder bridges are actually um
  2342. 1:16:18grade two listed
  2343. 1:16:21they have
  2344. 1:16:22uh
  2345. 1:16:24structural issues think brittle brittle
  2346. 1:16:26failures that there's a lot a lot of
  2347. 1:16:28monitoring on those structures cuz
  2348. 1:16:30they're not in the best of state. The
  2349. 1:16:32ability to upgrade those it's very
  2350. 1:16:34difficult to keep them in their original
  2351. 1:16:35condition and upgrade them so the choice
  2352. 1:16:38was made to just make them redundant.
  2353. 1:16:40They'll probably get turned into a cycle
  2354. 1:16:41track or something similar
  2355. 1:16:43but we built our new newer geometry
  2356. 1:16:45entirely off-line which also aids
  2357. 1:16:47aids staging in that you build the new
  2358. 1:16:49infrastructure connect the ends in
  2359. 1:16:51commission it instead of having to close
  2360. 1:16:53the railway for a long time to rebuild
  2361. 1:16:54those bridges. So we're off-line we need
  2362. 1:16:57to
  2363. 1:16:58miss the council's waste disposal site
  2364. 1:17:00so we we we skirt parallel with that and
  2365. 1:17:02then the reverse curve I mentioned
  2366. 1:17:04earlier at Thornhill Road bridge top end
  2367. 1:17:06there
  2368. 1:17:07we we straighten that out. We we
  2369. 1:17:09deliberately went off-line sufficiently
  2370. 1:17:12find the photo off-line sufficiently
  2371. 1:17:14that we can build the new bridge connect
  2372. 1:17:16the railway in either side and then the
  2373. 1:17:18old the old bridge becomes redundant.
  2374. 1:17:20So those are the two listed um
  2375. 1:17:24bridges on the existing route.
  2376. 1:17:26That's the new viaduct so it's two
  2377. 1:17:29independent structures over the sorry
  2378. 1:17:30three independent structures over the
  2379. 1:17:32Calder navigation and it's down to a
  2380. 1:17:34single four track viaduct when you go
  2381. 1:17:36over the river Calder.
  2382. 1:17:40And a little route video.
  2383. 1:17:42This is 11 minutes so we nearly we're
  2384. 1:17:44nearly done.
  2385. 1:17:45So Huddersfield station it's a little
  2386. 1:17:47bit clunky but it's only to have a look
  2387. 1:17:49around and I'm going to have to talk
  2388. 1:17:50fairly quickly over the top of this cuz
  2389. 1:17:51it doesn't doesn't pause.
  2390. 1:17:53So we've got the new station the
  2391. 1:17:55existing train shed roof so the existing
  2392. 1:17:57roof of Huddersfield is the largest span
  2393. 1:18:00and only one of four examples of a
  2394. 1:18:02Euston roof so Euston station which its
  2395. 1:18:04roof went years ago there's only four
  2396. 1:18:06examples Huddersfield is the biggest
  2397. 1:18:07one. So the main train shed from listing
  2398. 1:18:09perspective and
  2399. 1:18:11heritage we had to keep. We demolished
  2400. 1:18:13the small train shed and we're adding a
  2401. 1:18:14very very we're adding a very
  2402. 1:18:16contemporary structure alongside. So
  2403. 1:18:17that's the main train shed which gets
  2404. 1:18:19renovated has its lantern put back on
  2405. 1:18:20the top with a new structure alongside.
  2406. 1:18:23We keep the underpass and we get a new
  2407. 1:18:25footbridge at the
  2408. 1:18:27east end as well to cover the fact that
  2409. 1:18:29the platforms move quite a long way
  2410. 1:18:30towards Leeds.
  2411. 1:18:32We head out onto onto the viaduct the
  2412. 1:18:35major structure in John William Street
  2413. 1:18:36immediately come out of the station
  2414. 1:18:39that was completely replaced about 18
  2415. 1:18:41months ago I think.
  2416. 1:18:42So we've already already done the works
  2417. 1:18:44there. The geometry over the bridge is
  2418. 1:18:47different due to how we come off the
  2419. 1:18:48platforms and we needed to extend the
  2420. 1:18:50platforms over the bridge as well so
  2421. 1:18:52that one has already been reconstructed.
  2422. 1:18:54We've got four tracks well five
  2423. 1:18:56initially but straight down to four
  2424. 1:18:57tracks on the original five track
  2425. 1:18:59formation over the viaduct.
  2426. 1:19:01We'll have to have another look at John
  2427. 1:19:02William Street from the other side.
  2428. 1:19:06That's Fitzwilliam Street which is the
  2429. 1:19:07next bridge.
  2430. 1:19:11So OLE master coincident with the
  2431. 1:19:14spandrel walls of the viaduct so the
  2432. 1:19:15line lined up with the abutments and
  2433. 1:19:17columns.
  2434. 1:19:19So we go over the bridge which also
  2435. 1:19:21dictated where the S&C went because
  2436. 1:19:23they're registering at the overhead
  2437. 1:19:24line.
  2438. 1:19:25Uh other end of the viaduct, span 29.
  2439. 1:19:28Uh so originally a masonry arch for two
  2440. 1:19:31tracks with metallic extensions, two
  2441. 1:19:33tracks on one side, one on the other
  2442. 1:19:34side. Um metallic elements that that
  2443. 1:19:37were redundant, so only the masonry arch
  2444. 1:19:40was the live live ball. So those have
  2445. 1:19:42been removed and replaced uh by
  2446. 1:19:45pre-stressed concrete beams, which you
  2447. 1:19:46can see there. Is I before that and
  2448. 1:19:48there'll be some pictures of it getting
  2449. 1:19:50installed in a moment.
  2450. 1:19:53Just lifting out the metallic elements.
  2451. 1:19:54You can see the the two two-track arch
  2452. 1:19:56in the middle, which is the middle two
  2453. 1:19:57tracks.
  2454. 1:19:59Which is retained.
  2455. 1:20:05So heading off from almost at the end of
  2456. 1:20:07uh Huddersfield viaduct. On the
  2457. 1:20:08left-hand side is Hillhouse sidings. So
  2458. 1:20:10150 m long signal reception line, so you
  2459. 1:20:13don't need a shunter to accept a train,
  2460. 1:20:15so it's fully signaled into reception
  2461. 1:20:17line and then it splits into four top
  2462. 1:20:19sidings and uh an engineer's siding on
  2463. 1:20:22the left-hand side there.
  2464. 1:20:24It's a view from the opposite end
  2465. 1:20:25looking back towards Huddersfield.
  2466. 1:20:30So four tracks
  2467. 1:20:31all the way through just past temporary
  2468. 1:20:34platform that we've built.
  2469. 1:20:36Approaching Deighton station.
  2470. 1:20:39So the slow lines move to the left to
  2471. 1:20:40make room for the island platform in the
  2472. 1:20:42in the island platform but the plat the
  2473. 1:20:44old platform in the middle.
  2474. 1:20:45Which meant the reconstruction of the
  2475. 1:20:47bridge and uh rather interesting uh I
  2476. 1:20:50think it's a uh reinforced earth
  2477. 1:20:51embankment cutting slope to the
  2478. 1:20:55uh east side of the bridge.
  2479. 1:21:03Wait for the video.
  2480. 1:21:07The next bridge is the A62 Leeds Road.
  2481. 1:21:10Uh very very tight abutments. You can
  2482. 1:21:11see the constraints. See how close the
  2483. 1:21:13middle two tracks are here together. Six
  2484. 1:21:14tracks are six full through this
  2485. 1:21:15structure because the existing abutments
  2486. 1:21:18uh need rebuilding because it's a very
  2487. 1:21:20low bridge. You can't get the wires
  2488. 1:21:21under there.
  2489. 1:21:22Um so we're actually building a very
  2490. 1:21:24large new bridge. We'll build a
  2491. 1:21:25temporary bridge alongside to divert the
  2492. 1:21:27road, remove the existing bridge, finish
  2493. 1:21:31widening the new bridge,
  2494. 1:21:33and then put the road back to a smoother
  2495. 1:21:36alignment it was before we started. But
  2496. 1:21:38you end up with a very wide bridge with
  2497. 1:21:39with a rather large pavement on the on
  2498. 1:21:41the west side, which looks a bit
  2499. 1:21:42Somebody will ask in the future, why is
  2500. 1:21:43it so ridiculous? But that's that's the
  2501. 1:21:46reason why.
  2502. 1:21:48Heading on Bradley Junction coming up.
  2503. 1:21:50So a crossover and league currently 15
  2504. 1:21:51mph. We up that to 45, get the uh
  2505. 1:21:54Bradford trains out of the way quicker.
  2506. 1:21:56Still fast lines on the right, slow
  2507. 1:21:58lines on the left.
  2508. 1:22:01Where the uh the existing underpass
  2509. 1:22:03diverts off to the left. The left-hand
  2510. 1:22:06two tracks are the existing two tracks.
  2511. 1:22:08But our new
  2512. 1:22:09chord line in fast lines 100 mph cutting
  2513. 1:22:12the corner off.
  2514. 1:22:14There's a lot of earthworks and some
  2515. 1:22:15reinforced earthworks in there as well
  2516. 1:22:17to steepen the slopes.
  2517. 1:22:19Uh aerial view. So the the topography to
  2518. 1:22:22the right-hand side or above as you can
  2519. 1:22:23see there is significantly higher, so
  2520. 1:22:25it's a it's a fairly substantial
  2521. 1:22:27cutting.
  2522. 1:22:35That's the existing underpass which
  2523. 1:22:37returns as the up slow.
  2524. 1:22:39Uh at the end of the chord line uh
  2525. 1:22:42connect back in with the existing
  2526. 1:22:43routes.
  2527. 1:22:44Again, slow lines on the left, fast
  2528. 1:22:46lines on the right. We've now picked up
  2529. 1:22:48the Calder Valley lines have come in. Uh
  2530. 1:22:50slow line coming in from Huddersfield
  2531. 1:22:51after the underpass.
  2532. 1:22:55Slowly work towards uh
  2533. 1:22:58Mirfield.
  2534. 1:23:05Got Mirfield viaduct.
  2535. 1:23:07Interesting, Mirfield viaduct was a was
  2536. 1:23:09two tracks until very late. It was only
  2537. 1:23:11four tracks in 19 30s. Uh and they they
  2538. 1:23:16uh metallic elements, so that's the view
  2539. 1:23:17from the from the north. So the view
  2540. 1:23:19from the south in a moment. Metallic
  2541. 1:23:21addition in the 1930s actually one of
  2542. 1:23:23the worst structures on the route. So
  2543. 1:23:24there's quite a lot of work needed to to
  2544. 1:23:26revamp and uh strengthen the the
  2545. 1:23:28existing structure for us to support new
  2546. 1:23:30110 mph railway over it.
  2547. 1:23:34Uh new Mirfield station. So the station
  2548. 1:23:37is actually on off the foreground to
  2549. 1:23:38left. It's entirely uh this side of the
  2550. 1:23:40road. Um
  2551. 1:23:42so it's part of the station access with
  2552. 1:23:43a new car park. Um so the main access is
  2553. 1:23:47from from the south side. We've retained
  2554. 1:23:48the access from the road underpass via a
  2555. 1:23:50vestibule and then up a staircase.
  2556. 1:23:52You've got a subterranean foyer in there
  2557. 1:23:54as well, but that's a a new 150 m long
  2558. 1:23:57station capable of being extended if
  2559. 1:23:59needed.
  2560. 1:24:01Uh
  2561. 1:24:02continuing on.
  2562. 1:24:05Only three tracks, so it's the second
  2563. 1:24:07track from the right is currently
  2564. 1:24:08missing, but the outside track is only
  2565. 1:24:1040 mph, so it's an S3 rebuild. Rebuild
  2566. 1:24:13the uh the up loop and add turning to
  2567. 1:24:17the up fast and then add the down fast.
  2568. 1:24:19So this is now approaching the grade
  2569. 1:24:21separation at Ravensthorpe. So we've got
  2570. 1:24:24yet another new station at Ravensthorpe.
  2571. 1:24:26There we go.
  2572. 1:24:27Hopefully we'll have some waiting
  2573. 1:24:29shelters on it. It's not there on the
  2574. 1:24:30model. It's not going to be quite as
  2575. 1:24:31bare as that. So a single access bridge
  2576. 1:24:33from from the far side.
  2577. 1:24:36Our flyover lines, fast lines are
  2578. 1:24:38climbing up. Uh and then as soon as you
  2579. 1:24:41go on past uh to the east of uh Calder
  2580. 1:24:43Road,
  2581. 1:24:44um you've got the intersection bridge
  2582. 1:24:46with the junction sat underneath it.
  2583. 1:25:01Some interesting gradients at 1 in 70 we
  2584. 1:25:03ended up using for the flyover. Is that
  2585. 1:25:05correct, James?
  2586. 1:25:06It's 1 in 80. 1 in 80. Uh so we did
  2587. 1:25:08quite a lot of modeling. So although
  2588. 1:25:09this is the fast lines are not a freight
  2589. 1:25:11route and via Leeds isn't a freight
  2590. 1:25:14route, it's only engineering trains.
  2591. 1:25:15Still need to be capable of getting a
  2592. 1:25:17freight train up there. So the generic
  2593. 1:25:19steep ignoring miles platting bank at
  2594. 1:25:21Manchester, the generic steepest
  2595. 1:25:22gradient on the route was 1 in 75, 1 in
  2596. 1:25:2578 in two different locations. So 1 in
  2597. 1:25:2880 was the was the chosen gradient for
  2598. 1:25:30for the for the new line even though in
  2599. 1:25:32theory it doesn't it doesn't get freight
  2600. 1:25:34traffic. So that's the new Baker
  2601. 1:25:35viaduct. So as the the the middle two
  2602. 1:25:38lines are higher, so it's an independent
  2603. 1:25:39structure until you get to the bridge
  2604. 1:25:42and that becomes the four-track viaduct
  2605. 1:25:43to that point.
  2606. 1:25:45Down to two tracks and you will just see
  2607. 1:25:47where we cross over the existing lines.
  2608. 1:25:50Shoots from the bottom left across the
  2609. 1:25:51right-hand side and then back across
  2610. 1:25:53again.
  2611. 1:25:54Approaching Thornhill Road.
  2612. 1:26:04And then it's Dewsbury station in in the
  2613. 1:26:06distance just there.
  2614. 1:26:16Yeah, one
  2615. 1:26:17uh and that's the final view of of Baker
  2616. 1:26:19viaduct.
  2617. 1:26:20So
  2618. 1:26:23that's it from the track perspective.
  2619. 1:26:24I've got about 10 more slides just
  2620. 1:26:26talking about the station and the
  2621. 1:26:27architecture. So it'd be worth just uh
  2622. 1:26:29flicking through those quickly. I'm just
  2623. 1:26:30looking at Louise as to whether or not
  2624. 1:26:31I'll
  2625. 1:26:32Cuz I'm at 7:00 already.
  2626. 1:26:35Uh feel feel So we finished talking
  2627. 1:26:37track, so if you do need to go, feel
  2628. 1:26:38free to go. So I won't be offended. Um
  2629. 1:26:41so Huddersfield station, uh Harold
  2630. 1:26:44Wilson statue outside the station. So
  2631. 1:26:45grade one listed structure. I talked I
  2632. 1:26:47talked about that earlier.
  2633. 1:26:49Um
  2634. 1:26:50So
  2635. 1:26:52the
  2636. 1:26:53existing train shed I mentioned the main
  2637. 1:26:55uh
  2638. 1:26:56roof phase, the main train shed roof B.
  2639. 1:26:58B is the small train shed and C is a
  2640. 1:27:00cantilever
  2641. 1:27:01uh later addition cantilever on on the
  2642. 1:27:03side. Uh so we're keeping A, we're
  2643. 1:27:05removing B and C, and putting a new
  2644. 1:27:08canopy alongside. So the yellow is the
  2645. 1:27:09proposed platform with the orange is the
  2646. 1:27:12um second platform access. We've got the
  2647. 1:27:14existing subway which is lengthened,
  2648. 1:27:16extended. Um we've got a secondary route
  2649. 1:27:19via via a footbridge at the eastern end
  2650. 1:27:21at the Leeds end.
  2651. 1:27:23Um so we the pink there is our new uh
  2652. 1:27:27contemporary um
  2653. 1:27:28gullwing roof and we extend the existing
  2654. 1:27:33canopy. So we've actually shortened the
  2655. 1:27:34canopy at the Manchester end.
  2656. 1:27:37Uh we've taken
  2657. 1:27:39roughly four of the
  2658. 1:27:41trusses out um
  2659. 1:27:43and move them to move We move them to
  2660. 1:27:45the other end. The reason we move them
  2661. 1:27:46to the other end is the fact that the
  2662. 1:27:48because of the way the pedestrian
  2663. 1:27:49platform and all the track layout
  2664. 1:27:50between the tunnel and the station, the
  2665. 1:27:52entire station moves towards Leeds. So
  2666. 1:27:54it it enables us to to line everything
  2667. 1:27:56up. So the the struc the trusses that
  2668. 1:27:58have come out are actually getting
  2669. 1:28:00reused and reinstated to to put the
  2670. 1:28:03uh Leeds end of the canopy back to where
  2671. 1:28:05it was originally. So it was actually
  2672. 1:28:06curtailed in the late 1970s, I think. Um
  2673. 1:28:10which is when it lost its lantern.
  2674. 1:28:13So that's a cross-section. So the
  2675. 1:28:15right-hand uh structure is retained. The
  2676. 1:28:17the left-hand uh truss is removed and
  2677. 1:28:20then we get this uh contemporary
  2678. 1:28:22gullwing arrangement. Which was
  2679. 1:28:24originally open to the elements. Uh so
  2680. 1:28:26the vertical element in the middle would
  2681. 1:28:27would would didn't exist until somebody
  2682. 1:28:29pointed out that that that point that's
  2683. 1:28:31in the direction of the prevailing
  2684. 1:28:33winds, which is so in the middle of
  2685. 1:28:34winter you'll have a absolute howling
  2686. 1:28:36gale running through the station at
  2687. 1:28:37Huddersfield. Uh so that's that's now
  2688. 1:28:39closed off and can be closed or clad,
  2689. 1:28:42but uh the structure now is um
  2690. 1:28:45is at least closed off.
  2691. 1:28:48Uh and that's a
  2692. 1:28:49complete visualization of what they
  2693. 1:28:52canopy looks like. Some more views.
  2694. 1:28:55Uh bridge at the other end, so we've got
  2695. 1:28:56another contemporary footbridge. Uh not
  2696. 1:28:58quite sure how they're going to clean
  2697. 1:28:59the glass on that, but uh
  2698. 1:29:01my problem.
  2699. 1:29:04So um obviously the top right is the um
  2700. 1:29:08the solar modeling of uh the all the
  2701. 1:29:10glass that's that's going in.
  2702. 1:29:12Uh and part of the reason for for
  2703. 1:29:14angling the glass is to avoid having um
  2704. 1:29:16sunlight glare back to the driver as
  2705. 1:29:18well to make sure that the angles the
  2706. 1:29:20angles work so you don't obscure
  2707. 1:29:23signal sighting and then just a few
  2708. 1:29:25quick slides on current progress. So
  2709. 1:29:28transport works out already came through
  2710. 1:29:31end of last year I think so work started
  2711. 1:29:33on site. So this is the new Baker
  2712. 1:29:35Viaduct so these are all the piles going
  2713. 1:29:37in for uh
  2714. 1:29:39for the raft for the foundations. You'll
  2715. 1:29:40see the existing Calder Bridge in the
  2716. 1:29:42background so
  2717. 1:29:43this is where the viaducts goes over the
  2718. 1:29:45Calder navigation it climbs up uh
  2719. 1:29:47towards in fact I've actually put it on
  2720. 1:29:49that's roughly the geometry of the the
  2721. 1:29:51proposed line with the photograph.
  2722. 1:29:54As we move up to the junction
  2723. 1:29:56this is geometry goes roughly through
  2724. 1:29:58there so there's a
  2725. 1:29:59significant amount of earthworks we need
  2726. 1:30:01to cut back cut back the the cutting
  2727. 1:30:03slope and put a step slope so we've got
  2728. 1:30:05a railway halfway up that slope so
  2729. 1:30:06there's few few hundred million tons of
  2730. 1:30:09uh
  2731. 1:30:09muck to shift probably in there.
  2732. 1:30:12And a couple of views looking the other
  2733. 1:30:13way so some major civil engineering
  2734. 1:30:15works
  2735. 1:30:16in play now.
  2736. 1:30:18So the plan is that box is designed to
  2737. 1:30:21be entirely off the existing geometry so
  2738. 1:30:23the full intersection bridge Baker
  2739. 1:30:24Viaduct all the earthworks around it are
  2740. 1:30:27constructed in advance
  2741. 1:30:29the Wakefield lines are getting diverted
  2742. 1:30:31through the box and then they finish off
  2743. 1:30:33the earthworks at the the Huddersfield
  2744. 1:30:34end
  2745. 1:30:35of
  2746. 1:30:36the scheme so this minimize minimize
  2747. 1:30:39disruption
  2748. 1:30:40on the route and that is it finally.
  2749. 1:30:44146 slides later.
  2750. 1:30:48So any any questions? Do you want to
  2751. 1:30:50come and work with the computer there?
  2752. 1:30:59So anyone in the room got any questions?
  2753. 1:31:02Yeah.
  2754. 1:31:03Is that Malcolm?
  2755. 1:31:05Um
  2756. 1:31:06you've still got some significant double
  2757. 1:31:07track sections left really just Dewsbury
  2758. 1:31:09but probably Huddersfield and
  2759. 1:31:11Stalybridge.
  2760. 1:31:12With a mixture of all them fast trains
  2761. 1:31:14are still stopping service.
  2762. 1:31:16How do you manage to
  2763. 1:31:18accommodate that with that
  2764. 1:31:21With difficulty. Yeah we thought so. Uh
  2765. 1:31:24so
  2766. 1:31:25um
  2767. 1:31:27a stopping service leaves so the plan is
  2768. 1:31:30for the fast trains to be at quarter
  2769. 1:31:32hourly intervals. The answer is we will
  2770. 1:31:34have to flex the exact quarter hour that
  2771. 1:31:35was originally agreed is that your four
  2772. 1:31:38fast trains are on the clock face and we
  2773. 1:31:40fit everything else in between. We are
  2774. 1:31:41actually going to have to flex that now
  2775. 1:31:43so DfT are happy with a couple of
  2776. 1:31:44minutes flex to make that work. But
  2777. 1:31:46generically the stopping service the
  2778. 1:31:49Huddersfield stopping service leaves
  2779. 1:31:50Leeds two minutes behind the fast
  2780. 1:31:51service.
  2781. 1:31:53By the time it gets to Baker Junction
  2782. 1:31:54Baker Junction the next fast service has
  2783. 1:31:56caught it up.
  2784. 1:31:57Extending the four tracking to include
  2785. 1:31:59Dewsbury station wouldn't made a huge
  2786. 1:32:00difference but there are 11 structures
  2787. 1:32:02in that three quarter of a mile length
  2788. 1:32:04between Baker Junction and Dewsbury
  2789. 1:32:06station. It was going to be a really
  2790. 1:32:07really expensive intervention. That's
  2791. 1:32:09actually something that Northern
  2792. 1:32:10Powerhouse Rail uh HS2 are looking at
  2793. 1:32:13further extending the four tracking but
  2794. 1:32:15for the volume of trains that we've got
  2795. 1:32:17it does just work. Um
  2796. 1:32:19it does work from a timetable
  2797. 1:32:21perspective there's just potential
  2798. 1:32:22performance hit which is why it was
  2799. 1:32:23really important to be able to get those
  2800. 1:32:24stopping trains off quickly.
  2801. 1:32:26Yeah. Um It must be susceptible though
  2802. 1:32:28with a few minutes delay. It did I
  2803. 1:32:30absolutely yes yes. And especially on
  2804. 1:32:32the very long section across the top and
  2805. 1:32:34filling down the other side. So the
  2806. 1:32:37there is a significant so we it was
  2807. 1:32:40it worked relatively well
  2808. 1:32:43until we added freight. At the top there
  2809. 1:32:45so um so your four fast your two
  2810. 1:32:48semi-fast and your two stoppers between
  2811. 1:32:49Huddersfield and Manchester worked. As
  2812. 1:32:51soon as you try and squeeze freight in
  2813. 1:32:53as well
  2814. 1:32:54one path and now you you almost
  2815. 1:32:56certainly lose that second stopping
  2816. 1:32:58service so you'll have your two the
  2817. 1:33:01likely output is not determined yet
  2818. 1:33:03because we're still working on concept
  2819. 1:33:04timetable three. Um but the likely
  2820. 1:33:06scenario is that you'll have your two
  2821. 1:33:07stoppers during morning and evening peak
  2822. 1:33:09and in the middle of the day you'll lose
  2823. 1:33:10one of those for to be able to get
  2824. 1:33:12freight services through there. Freight
  2825. 1:33:14is a significant challenge because as I
  2826. 1:33:15mentioned earlier whatever speed they're
  2827. 1:33:16doing at the bottom they'll do all the
  2828. 1:33:18way up the hill. Um so W2C is still in
  2829. 1:33:22development because it is proposed that
  2830. 1:33:24we three track we put a long up loop all
  2831. 1:33:27the way from Gledhow all the way up to
  2832. 1:33:28up to including Marsden and it includes
  2833. 1:33:30Slaithwaite and Marsden stations.
  2834. 1:33:32So that is primarily an up loop but
  2835. 1:33:34we're putting in the middle and
  2836. 1:33:36connecting it to down lines as well so
  2837. 1:33:37you've actually got a dynamic loop that
  2838. 1:33:38can be used both ways but it's
  2839. 1:33:40predominantly an up loop capable of
  2840. 1:33:41being used in the down direction. Um on
  2841. 1:33:44the timetable we'll probably end up
  2842. 1:33:45using it both ways. So you put it in the
  2843. 1:33:47middle? Put it in the middle yeah. Yeah
  2844. 1:33:48that makes sense to me yeah.
  2845. 1:33:50And we platforms on all three lines at
  2846. 1:33:51Slaithwaite and Marsden so you can run
  2847. 1:33:53your trains on whichever line. That's a
  2848. 1:33:54whole another presentation also we'll
  2849. 1:33:56leave that one later. But getting over
  2850. 1:33:57the hill is a challenge and even with
  2851. 1:33:59that three tracking you've still got a
  2852. 1:34:00challenge coming in the opposite
  2853. 1:34:01direction
  2854. 1:34:03so we're looking at options for loops
  2855. 1:34:04around Manchester so Baguley Fold area
  2856. 1:34:06we're potentially going to have to put
  2857. 1:34:07freight regulating loops in there
  2858. 1:34:10because you literally can't get all the
  2859. 1:34:12way from Manchester Victoria through to
  2860. 1:34:14Huddersfield before then fast train has
  2861. 1:34:16caught freight train. So there's some
  2862. 1:34:18significant challenges you quite correct
  2863. 1:34:20the two track sections are significant
  2864. 1:34:21challenges and east of Leeds similar
  2865. 1:34:24so Leeds through to Leeds through to
  2866. 1:34:26Micklefield is is an absolute nightmare
  2867. 1:34:27that's actually the worst portion of
  2868. 1:34:29TIU.
  2869. 1:34:30Um as it stands at the moment. Again NPR
  2870. 1:34:32are looking at partially four tracking
  2871. 1:34:34and then potentially grade separating
  2872. 1:34:36Micklefield Junction there's lots of
  2873. 1:34:37things that that that could be done to
  2874. 1:34:39improve that portion of route. The only
  2875. 1:34:41thing that's semi-definite is
  2876. 1:34:43um the new Thorpe Park station where the
  2877. 1:34:45M62 crosses us
  2878. 1:34:47from M62 the M1 crosses the railway
  2879. 1:34:49Garforth immediately to the west of that
  2880. 1:34:51there's a proposal by the council to
  2881. 1:34:52build a park and ride station so that's
  2882. 1:34:55Thorpe Park station. So four track have
  2883. 1:34:57a short four track station that picks up
  2884. 1:34:59the new Thorpe Park station and
  2885. 1:35:00Crossgates station. So you've got a
  2886. 1:35:02dynamic loop with two stops so then that
  2887. 1:35:04allows the fast train to pass and pass a
  2888. 1:35:05stopper so that is likely but it's not
  2889. 1:35:10currently currently in scope. But
  2890. 1:35:12there's a lot more to come. There's a
  2891. 1:35:13lot to Yes. So the reason
  2892. 1:35:15I'm still
  2893. 1:35:16uh working the development team in TIU
  2894. 1:35:18is because we still don't know what
  2895. 1:35:20we're building after working on it for
  2896. 1:35:21eight years and we're building half of
  2897. 1:35:22it but we're still the client is
  2898. 1:35:23constantly changing their mind i.e. the
  2899. 1:35:25government and the DfT as to what they
  2900. 1:35:27want which keeps me in a job
  2901. 1:35:30and has done for for for a number of
  2902. 1:35:31years and will continue to do so for at
  2903. 1:35:33least the next five I'm guessing so
  2904. 1:35:35uh
  2905. 1:35:37Thank you James. Um any more questions
  2906. 1:35:39Alaric?
  2907. 1:35:41Yeah um great presentation James thanks.
  2908. 1:35:43Um I'm intrigued by the big bang option
  2909. 1:35:45um
  2910. 1:35:46talked about beginning couple slides. Um
  2911. 1:35:49I think you mentioned I think when you
  2912. 1:35:51started said the whole um
  2913. 1:35:53budget project about 11 and a half
  2914. 1:35:54billion it stands at? Yes. Something
  2915. 1:35:56like that and you meant and then you
  2916. 1:35:57said that the big bang was more.
  2917. 1:36:00How much more was it? Uh
  2918. 1:36:02the answer is I can't remember because
  2919. 1:36:03that was about seven years ago. Um at
  2920. 1:36:06the time that we looked at it the budget
  2921. 1:36:07was three billion pounds 3.1 billion not
  2922. 1:36:0911 um so it didn't fall within the
  2923. 1:36:12budget at the time. Uh when there's
  2924. 1:36:14there's lots of there's lots of
  2925. 1:36:15challenges on TIU. Uh would you have
  2926. 1:36:17actually been better not doing TIU at
  2927. 1:36:19all and spending two billion pounds on
  2928. 1:36:21doing a better job at Leeds station
  2929. 1:36:22because that's the linchpin for the
  2930. 1:36:23whole of Yorkshire. Although it was only
  2931. 1:36:25rebuilt 20 years ago and it made a big
  2932. 1:36:27difference because it was a 50% extra
  2933. 1:36:29capacity going from four to six tracks
  2934. 1:36:31at the west end it's still a significant
  2935. 1:36:33constraint in the area so
  2936. 1:36:34there are lots of
  2937. 1:36:36left field challenges as to well do you
  2938. 1:36:38really want to do that you should be
  2939. 1:36:39doing this which is another interesting
  2940. 1:36:42point when it comes to consents because
  2941. 1:36:43it's a single scheme over a very very
  2942. 1:36:47over 70 miles of route. Whenever you go
  2943. 1:36:49for a transport works act order the
  2944. 1:36:51challenge is always why are you doing it
  2945. 1:36:52here why can't you do it somewhere else?
  2946. 1:36:55So we need to be very very consistent
  2947. 1:36:56with our approach for feasibility over
  2948. 1:36:58the whole route and deal with everything
  2949. 1:36:59in a consistent way so we can answer
  2950. 1:37:01those questions why do we actually have
  2951. 1:37:03to do a big four tracking scheme between
  2952. 1:37:05Huddersfield and Dewsbury? So a lot of
  2953. 1:37:08the slides that I had today are actually
  2954. 1:37:10pulled from the transport works act
  2955. 1:37:11order order slides so a lot of the
  2956. 1:37:12images
  2957. 1:37:14and diagrams come come from there.
  2958. 1:37:16Thanks I want to ask a question. Um I've
  2959. 1:37:19never seen so many schemes in my life
  2960. 1:37:21but
  2961. 1:37:22don't quite understand um
  2962. 1:37:25how the system works. Do you know
  2963. 1:37:28Network Rail come up with the options
  2964. 1:37:30and you work them up or are you a
  2965. 1:37:32totally separate organization? So I
  2966. 1:37:36I work for myself but I am actually
  2967. 1:37:38contracted directly within Network
  2968. 1:37:40Rail
  2969. 1:37:41but we've we've actually we've got an
  2970. 1:37:43alliance of uh
  2971. 1:37:45Arabs AM E Network Rail
  2972. 1:37:48uh and Bam as before the main main um
  2973. 1:37:52participants. We've got Siemens as well
  2974. 1:37:53now for signaling and digital signaling
  2975. 1:37:55with ETCS. Um so
  2976. 1:37:58it's it's
  2977. 1:38:00uh
  2978. 1:38:01an alliance based commutative approach
  2979. 1:38:03so we have outputs so Network Rail have
  2980. 1:38:06not stipulated the interventions they've
  2981. 1:38:08stipulated what we need to achieve and
  2982. 1:38:10then we develop schemes to achieve those
  2983. 1:38:12outputs.
  2984. 1:38:13Um
  2985. 1:38:14there is an element of
  2986. 1:38:16you need to be doing this as part of it
  2987. 1:38:17but it's what that doing this looks like
  2988. 1:38:20is still being part of the development
  2989. 1:38:21which with that multi-disciplinary
  2990. 1:38:23approach.
  2991. 1:38:24So you've got a
  2992. 1:38:25a lovely layout at the east end of
  2993. 1:38:28Huddersfield but the west end
  2994. 1:38:30what about a 2000 ton freight train
  2995. 1:38:33heading west?
  2996. 1:38:36You know it's got to
  2997. 1:38:38So
  2998. 1:38:40So luckily we haven't got it's it's 1800
  2999. 1:38:43tons is our remit which is freight into
  3000. 1:38:45Mogul. You do actually have 2500 ton
  3001. 1:38:47biomass trains that get diverted that
  3002. 1:38:49way but they predominantly go via Calder
  3003. 1:38:51Valley.
  3004. 1:38:52Um so it's predominantly 1800 ton train
  3005. 1:38:54that we're worrying about. Um
  3006. 1:38:56so I mentioned about trying to get it
  3007. 1:38:58into the station as quickly as possible.
  3008. 1:38:59When we developed that high speed ladder
  3009. 1:39:01to try and manage the freight trains
  3010. 1:39:02that did were were envisaged at the time
  3011. 1:39:04we've got more now.
  3012. 1:39:06Um
  3013. 1:39:06that was assuming that we were then
  3014. 1:39:07going to have to run with all the fast
  3015. 1:39:09trains all the way to to Stalybridge or
  3016. 1:39:12or further.
  3017. 1:39:13Now we've got three tracking as soon as
  3018. 1:39:15you get beyond Huddersfield and Gledholt
  3019. 1:39:17Tunnel, you only need to manage that
  3020. 1:39:19really short one 1.5 mile long two track
  3021. 1:39:21section and then you're back onto a
  3022. 1:39:22dedicated line for the freight train. So
  3023. 1:39:24it's significantly less impactful is
  3024. 1:39:26that slow train now. The fact that you
  3025. 1:39:28can squeeze it through the station,
  3026. 1:39:30through the tunnel and then you get it
  3027. 1:39:31out of the way again to go up the hill.
  3028. 1:39:33Will those tracks will be bi-directional
  3029. 1:39:35all the way through to Um
  3030. 1:39:41Not initially with conventional
  3031. 1:39:42signaling. There will be with ETCS
  3032. 1:39:44because we're going to get
  3033. 1:39:44bi-directional signaling everywhere with
  3034. 1:39:46ETCS. Um so but under normal working it
  3035. 1:39:49will be be an up the Southbound will be
  3036. 1:39:51an up line and the Northbound will be a
  3037. 1:39:52down line. So that freight train needs
  3038. 1:39:55to come across the layout, get onto the
  3039. 1:39:56up line and then and then go onto the up
  3040. 1:39:59loop or the the in on the center loop in
  3041. 1:40:01the up direction.
  3042. 1:40:05It is another whole presentation cuz the
  3043. 1:40:07the connections on the down direction
  3044. 1:40:08are not actually at the end of the loop,
  3045. 1:40:10they're halfway along which allows the
  3046. 1:40:11tender loop to be used by two trains at
  3047. 1:40:13the same time because one can still get
  3048. 1:40:14out the the way of the other one. Um so
  3049. 1:40:17even that's quite complicated as to to
  3050. 1:40:19how we're proposing that so there's been
  3051. 1:40:20a reasonable amount of
  3052. 1:40:22development. But because that's still in
  3053. 1:40:24development and not
  3054. 1:40:26committed and in delivery so I'm trying
  3055. 1:40:28to just concentrate on what we what
  3056. 1:40:29we've already done and what we're
  3057. 1:40:30currently committed to deliver so.
  3058. 1:40:33Any more questions online?
  3059. 1:40:36No? Okay, we can thank James and you can
  3060. 1:40:38use your way.
  3061. 1:40:44Okay, presentation. Very good. I broke
  3062. 1:40:45my record with 46 slides. Well done.
  3063. 1:40:50Look forward to another presentation on
  3064. 1:40:51this when you got some of the other
  3065. 1:40:53proposals worked out.
  3066. 1:40:55Cuz
  3067. 1:40:56that was really good.
  3068. 1:40:59You know what I think you got last
  3069. 1:41:00question actually online. Say any
  3070. 1:41:02concern with historic mining works,
  3071. 1:41:04particularly Colne Bridge corner or
  3072. 1:41:06Ravensknowle area? Um so we've got
  3073. 1:41:09concerns with mine workings pretty much
  3074. 1:41:11everywhere on transfer line whether it's
  3075. 1:41:12east or west but mostly in west of
  3076. 1:41:14Leeds. Um
  3077. 1:41:17I am I am not well enough informed to
  3078. 1:41:19say what we're doing but it is a
  3079. 1:41:21significant concern even all the way
  3080. 1:41:23over to Manchester so the Manchester
  3081. 1:41:24through to Stalybridge element there
  3082. 1:41:27were issues there with mine workings and
  3083. 1:41:28the overhead line
  3084. 1:41:30foundations that we're putting in.
  3085. 1:41:32Um so yeah, significant risk. Also
  3086. 1:41:34unexploded ordnance of Second World War
  3087. 1:41:36ordnance so Huddersfield was quite
  3088. 1:41:37heavily bombed in the war.
  3089. 1:41:39Um I don't think we've had any incidents
  3090. 1:41:41yet but that's another
  3091. 1:41:43concern.
  3092. 1:41:45Makes sense.
  3093. 1:41:47Good. Thank you very much. Okay.
  3094. 1:41:49I'm going to bring you a black sack and
  3095. 1:41:50you I'll sit down there.
  3096. 1:41:52Don't let it collapse.

About this transcript

This page contains the full transcript of Better layouts for a better railway - James Hodge by Railway Engineering Institution (RailEI), generated from the public captions YouTube serves with the video. The transcript has 19,258 words across 3,096 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.