Alex Requirements 1 — Transcript
Full transcript
- 0:00client's portal.
- 0:05>> This is the client's portal.
- 0:08>> Yeah, the client's portal is on the
- 0:09right and this is our portal on the
- 0:11left. So, we're going to be taking
- 0:13information from our portal and putting
- 0:15it into the client's portal.
- 0:17Um
- 0:19so, we're just going into job lists.
- 0:26Uh
- 0:28So, we're just uh putting in the job
- 0:29number by removing any operation status,
- 0:31finding the job in the client's portal,
- 0:33which is this job here.
- 0:36So,
- 0:37uh I just need to do a subs request for
- 0:39this job.
- 0:41Subs request is is requesting codes that
- 0:44we charge for the works completed.
- 0:46>> Okay.
- 0:48>> So, uh you can get the codes uh cuz this
- 0:52job's been coded by our team over here.
- 0:54So,
- 0:55uh this code has been canceled. So, the
- 0:57code that came with the work order is
- 0:59incorrect code, so it needs to be
- 1:01removed, which is during the invoicing
- 1:03stage. And then this code here, which uh
- 1:06says variation requested, is the
- 1:08additional code that we need to be added
- 1:10into the client's portal.
- 1:13So, uh we go to on hold.
- 1:19Emergency work sheet requests.
- 1:22Add new services.
- 1:28Add the code.
- 1:31Select the code.
- 1:33So,
- 1:40select the
- 1:41location. So, this
- 1:44It's for the building.
- 1:50And the quantity.
- 1:52So, we're just uh pretty much copying
- 1:54this line item, quantity of one, the
- 1:57code, and we're putting into the
- 1:59client's portal here, the same code.
- 2:01>> Okay. The codes in the client's portal
- 2:04are already set up, and they will always
- 2:07be there. You don't need to add a new
- 2:09one.
- 2:11>> There's a schedule of rates, which is as
- 2:14as all the codes within it.
- 2:16If it's a code that's not there,
- 2:18we process it and then it will
- 2:20>> There's there's no such thing as there's
- 2:21manuals. So
- 2:23>> So you if you copy a code from here and
- 2:25you go to add new services, all all the
- 2:28codes that we have in our system are
- 2:30available in their portal as well.
- 2:32>> Okay.
- 2:32>> They are
- 2:33>> [clears throat]
- 2:33>> mirrored across like that.
- 2:35>> Cuz obviously that's a potential place
- 2:36for the bot to get stuck if there's no
- 2:38code.
- 2:39>> Yeah, so if the code exists here, it
- 2:42should exist
- 2:43in the client's portal.
- 2:44>> Gotcha.
- 2:45And sorry, Alex, just to go back one
- 2:47step. You said that the original code
- 2:49was incorrect or there was a a a
- 2:52variation. Is that going to happen on
- 2:54all jobs or just this particular
- 2:55example?
- 2:57>> Just just in this particular example.
- 2:59>> Okay.
- 2:59>> So during during during the current
- 3:01status, they they issued a work order
- 3:03with a code.
- 3:04>> Gotcha.
- 3:04>> And this code was just the incorrect
- 3:07code. So during the latest status in the
- 3:10invoicing status, we're actually going
- 3:11to delete this code.
- 3:13>> Okay.
- 3:13>> So typically the the
- 3:17it should say original work order
- 3:18approved.
- 3:20And that would be the code that came
- 3:21with the work order. So if it still
- 3:23applied, it would be in that status, but
- 3:24I changed it to canceled because it's
- 3:27it's no longer relevant. And I've
- 3:28actually zeroed out the quantity so that
- 3:30it doesn't come up on the invoice as a
- 3:32price.
- 3:33>> Okay. So as far as the bot goes, if the
- 3:38if you can scroll to the right again
- 3:40so I can see that field.
- 3:41Yeah, so if that is it tracking
- 3:44>> tracking center [clears throat]
- 3:45>> center. So if that's canceled, then
- 3:47that's when you need to go and enter a
- 3:49new code. But if it's not canceled,
- 3:50you'll just enter the the one code
- 3:53that's there that the approved one, is
- 3:54that right?
- 3:55>> So, if if you see variation requested,
- 3:59that means that we need to request this
- 4:01code. So, once the
- 4:03code has been approved, so at the moment
- 4:06it's showing draft.
- 4:08After we submit the request in the
- 4:10client's portal, this will go to
- 4:12submitted.
- 4:13>> Mhm.
- 4:13>> And then it should
- 4:15once it's approved, we can actually
- 4:16mirror it on our side and do variation
- 4:18approved or variation rejected if they
- 4:21do reject the code.
- 4:22>> Okay. But again, that has to be done
- 4:24manually because they don't allow API
- 4:26access, correct?
- 4:28>> Correct, Tina.
- 4:28>> Okay.
- 4:29>> So, typically for any works that are
- 4:34underneath the responsive limit,
- 4:36we don't need to send through a
- 4:38supplementary works form, but for this
- 4:40example I can show you.
- 4:42So, they
- 4:44they [clears throat] use
- 4:46It's called
- 4:48It's Formitize, yeah.
- 4:51So, in documents,
- 4:53supporting documents, there's a web
- 4:56link. If you click on this, it opens up
- 4:58a Formitize document and this document
- 5:01needs to be submitted for supplementary
- 5:03works requests over a certain amount.
- 5:06It's $450.
- 5:08>> Yeah, okay.
- 5:09Cool.
- 5:11>> So,
- 5:12on this form, um
- 5:14these forms are used in a few different
- 5:17examples like
- 5:19extension of time request, this is a
- 5:21supplementary works request, job
- 5:24cancellations.
- 5:26There's a few different examples, but
- 5:28for this one supplementary works
- 5:30request,
- 5:31there's a few mandatory fields. So, the
- 5:34facility reference number is just the
- 5:36the job number which I can copy from
- 5:38here.
- 5:40The contract area
- 5:42we take from the
- 5:44When you need to do reference everything
- 5:47back from verify to do anything until
- 5:49they push that one.
- 5:51>> Sure. So, over in
- 5:53over in Arrow Flow, if you scroll down
- 5:55to the the first document, this is the
- 5:59import attachment. So, this is the
- 6:00original work order.
- 6:03Uh, on this work order, it has the
- 6:07uh, area.
- 6:08So, this is CA2.
- 6:10On the form, we need to do contract area
- 6:12CA2.
- 6:13>> We we can pull it in a way where we can
- 6:15set that up as a custom field. So,
- 6:16that's at the top of the of the work
- 6:18order. So, it comes as a an extracted
- 6:21number, or it's somewhere there more in
- 6:24the
- 6:24when we're importing the job.
- 6:27Uh, we can we can change that
- 6:28on the initial import stage when the job
- 6:30comes in from the client.
- 6:34>> Uh, so, the request type is new codes
- 6:36required, which is yes.
- 6:38Amend required, no. So, that would be if
- 6:41it means the code and we wanted to
- 6:43increase the number.
- 6:44Number. So, this is no. And then, EOT
- 6:47required, uh, would be no this example.
- 6:53So, work program.
- 6:55Uh, this is a responsive or all the work
- 6:57orders come through as responsive.
- 7:01Uh, it will ask for
- 7:03work category. It's always priority
- 7:05repairs.
- 7:07And then, work priority, which
- 7:12>> 24 hours.
- 7:13>> hours.
- 7:14It's this is also in
- 7:16uh, Arrow Flow. Here in the priority,
- 7:19we've got the priority there.
- 7:21>> Mhm.
- 7:22>> It is 24 hours.
- 7:24>> Need to put in the email address of the
- 7:26person who's going to be receiving the
- 7:27form.
- 7:36Is the property being made safe? Yes.
- 7:38And then, this is the reasoning for the
- 7:40request. include no.
- 7:43Um so for the details for the request,
- 7:47we always put a comment which which can
- 7:49just be copied and pasted.
- 7:51So this comment goes in here.
- 7:56And photos need to be dragged and
- 7:58dropped into this location here. So
- 8:01these photos opened up, saved to the
- 8:04desktop.
- 8:06And then once they are all saved
- 8:14it needs to be dragged over to the form.
- 8:32I grabbed two extra quiet because the
- 8:34component's BR. So in this situation
- 8:36it's no.
- 8:37>> Sorry.
- 8:37>> to be a stable.
- 8:38>> What what's BR?
- 8:40>> So BR means beyond economical repair.
- 8:45The only The only times when this would
- 8:48need to be selected as yes is
- 8:50if an appliance needs to be replaced
- 8:52which is not a cooking appliance.
- 8:55So that would be like a range hood or a
- 8:57washing machine. They go They will raise
- 9:00a a different type of work order which
- 9:02is not responsive. It's programmed.
- 9:05So this is just an action for the client
- 9:07to raise new work order.
- 9:10So like 99% of the time this is just
- 9:12going to be a no.
- 9:14>> But you said if it's a cooking if it's a
- 9:16oven, microwave
- 9:19>> So if it if it's a non-cooking
- 9:20appliance, so if it's a range hood, if
- 9:22it's a washing machine,
- 9:24dryer, a dryer, they're the instances
- 9:27where they need to raise a programmed
- 9:28work order.
- 9:29Um see programmed works. But cooking
- 9:32appliances are done under responsive
- 9:34work order.
- 9:35>> Right. Okay.
- 9:37>> Um
- 9:38yeah.
- 9:39So we submit this form.
- 9:51So what will happen now is I'll receive
- 9:53an email with a PDF of that form.
- 9:59Just checking over here. So we have the
- 10:00the code ready to go.
- 10:04The comment needs to be added into
- 10:06reason comments.
- 10:07So the same comment from the subs
- 10:09request can go here.
- 10:33It's usually a 30 seconds to a minute it
- 10:35takes for the email to come through.
- 10:55So if it's
- 10:57So this is the form here.
- 11:00We
- 11:00save the form.
- 11:06Into supplementary works evidence.
- 11:08Click on the upload.
- 11:11Select on the date, today's date.
- 11:14I just copy this.
- 11:17This is Q6 supporting documents. Put it
- 11:19in the description.
- 11:23Find the document which is this one
- 11:25here.
- 11:27Touch the document.
- 11:29Hit upload.
- 11:32PDF is attached.
- 11:36And then we're going to hit
- 11:40If you upload a document, the the
- 11:42comment that goes here gets removed.
- 11:45>> All right.
- 11:48>> So the that comment actually needs to be
- 11:50added the very last thing before you hit
- 11:52submit.
- 11:54Then you hit submit.
- 12:01So now change the job status to on hold
- 12:03variation and then
- 12:04>> Like that's probably one of the hardest
- 12:06steps that we do a lot of
- 12:08changing and and a lot of different
- 12:09variables to to the information that we
- 12:12put right in. I I did notice there was a
- 12:14few things where like we had to go to
- 12:16certain sections to grab that
- 12:17information, but we can maybe have a
- 12:19chat on our side about how we can
- 12:21actually provide that information in a
- 12:24in a way where it can maybe even send it
- 12:27out as a report for the bot and and work
- 12:29it by our one on one situation.
- 12:31Um
- 12:32so then we can have like at a certain,
- 12:35you know, every hour
- 12:37we can have a report maybe extracted
- 12:38from our system or certain fields um and
- 12:41what status that job's in. So then the
- 12:44bot can go [clears throat] off that and
- 12:45go in and do all of it if we have to.
- 12:48Um
- 12:49that's probably I would say maybe the
- 12:51easiest way
- 12:52to get the information
- 12:54simplified and sent over, but that's the
- 12:57way the client's portal operates.
- 13:00>> Okay. So a couple questions. This
- 13:04um
- 13:04Ventia, is this for one client or all
- 13:08clients?
- 13:08>> This is This is for one client.
- 13:10>> Okay. And is there other separate
- 13:13portals that will require similar thing
- 13:15or we just going to work on this one?
- 13:16>> probably another four.
- 13:18>> Okay. So got you. So this is basically
- 13:20for this particular client only and then
- 13:22there'd be a similar
- 13:24thing for others.
- 13:26Does Gretchen or anyone in the group
- 13:28here already do this
- 13:30um
- 13:32data entry work?
- 13:33>> I do do some of that, yes.
- 13:35>> Have they
- 13:36Do they have like a like a step-by-step
- 13:39instructions that I can pair with the
- 13:41video?
- 13:41>> Uh
- 13:42Gretchen should have that.
- 13:44Okay. Gretchen should have
- 13:46>> All right, cuz that'll be helpful,
- 13:47obviously.
- 13:48>> She's got She's got a work file most
- 13:49things, but she should have that.
- 13:51>> Okay. Cool.
- 13:55And then how many of these per day
- 13:59are needed to be done?
- 14:02>> Depends.
- 14:03Depending like if between all blinds,
- 14:06probably about a hundred.
- 14:07>> Yeah.
- 14:08>> Okay.
- 14:09>> But around a hundred a day, and it's
- 14:11and there's there's an there's an onflow
- 14:13from that because each portal is
- 14:15different.
- 14:16>> Yeah.
- 14:16>> The workflow remains the same.
- 14:17>> Correct.
- 14:18>> So where we get the information from, it
- 14:20might just go to a different company
- 14:21portal to someone else's portal, but
- 14:24it's the same information that flows.
- 14:26>> Mhm.
- 14:27>> When Alex needs me for a custom field,
- 14:29maybe we can get him to set that up.
- 14:31That will take us 30 seconds to do as a
- 14:34custom field. So the bot could know
- 14:36knows where to go to to extract that
- 14:38information.
- 14:39>> Every time.
- 14:40>> The same thing for potentially uh I just
- 14:42wrote down the interview order of the
- 14:43notes. And we can set up a folder inside
- 14:46the documents which says whatever we
- 14:48want it to say, not AI but obviously, um
- 14:51where the bot could go to and get and
- 14:53get photos and and all that.
- 14:55>> Yeah.
- 14:55>> So there So we can adjust their flow to
- 15:00make it smoother for the bot to take
- 15:03that process away.
- 15:04Um and I'm not sure about the the final
- 15:08human is there a human factor we want to
- 15:10push the button? The final
- 15:11>> There there'll be there'll be multiple
- 15:13steps that the bot will have to do
- 15:16um from what we've gathered, but that's
- 15:18sort of the most complex one. So there
- 15:21could be ones where for like an EOT
- 15:23application, um
- 15:26what else, Chase? Um
- 15:28You got the sub works request, then
- 15:29you've got um
- 15:31job completion. So, once the the codes
- 15:33have been approved Uh after this was
- 15:36done, the uh status was changed to
- 15:39uh completed uh awaiting variation
- 15:42approval. So, this will go from on hold
- 15:46to in progress and variation approved.
- 15:49Once that's approved, we can complete
- 15:51the work order, which is uploading
- 15:54completion photos, risk assessments,
- 15:56completing the job. And the last step is
- 15:59invoicing the job.
- 16:01>> Okay. Cool.
- 16:03Do you guys have time to run through one
- 16:05more example that I can get on
- 16:07um record just to have another um
- 16:10example?
- 16:11>> Don't have a subs request, but I can
- 16:13give you like a job completion.
- 16:15>> Okay. Let me just
About this transcript
This page contains the full transcript of Alex Requirements 1 by Mkai Corporation, generated from the public captions YouTube serves with the video. The transcript has 2,330 words across 416 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.