- 11:18good morning can someone confirm that my
- 11:20microphone is
- 11:22working I can hear you Joe great thanks
- 11:26yes I can hear you
- 11:28both
- 11:58e
- 12:28e
- 12:58e
- 13:28e
- 13:58e
- 14:28e
- 14:58e
- 15:27e
- 15:57e
- 16:27e
- 16:57e
- 17:27e
- 17:57e
- 18:27e
- 18:57e
- 19:27e
- 19:57e
- 20:27e
- 20:57e
- 21:27e
- 21:57e
- 22:27e
- 22:57e
- 23:27e
- 23:57e
- 24:27e
- 24:57e
- 25:27e
- 25:57e
- 26:27e
- 26:57e
- 27:27e
- 27:57e
- 28:27e
- 28:57e
- 29:27e
- 29:57e
- 30:26e e
- 31:12good morning hey Tracy can you hear
- 31:17me good morning I can hear you all
- 31:21righty
- 31:25okay on one second
- 31:37[Music]
- 31:50just bear with me for one second
- 32:08things are happening really quickly here
- 32:09folks that I'm getting email messages on
- 32:11and I apologize for
- 32:13that
- 32:15um oops but
- 32:18uh some of them will affect us a little
- 32:20bit and some of them might not
- 32:39okay all right I apologize for that um
- 32:43we'll go on the record um with
- 32:45proceeding 23
- 32:48a-01
- 32:5397t
- 32:55okay uh 17 uh in the matter of the
- 32:58application of lumen doing business as
- 33:01centry link QC for 2023 basic emergency
- 33:06service provider Improvement plan
- 33:08administrative law judge Robert Garvey
- 33:10today is the 24th of June 2024 at
- 33:13approximately 9:02
- 33:16am um this proceeding comes down for a
- 33:19evidentiary hearing um quick things I
- 33:23well let's do entry of Appearances first
- 33:26uh we'll start with go in this order
- 33:28Century length UCA
- 33:30CCTA Lita CCA best 911 and then
- 33:36staff morning your honor Tom Snider from
- 33:39CAC rock on behalf of Sentry Link I'll
- 33:42explain who else is in the office here
- 33:44with me we have uh uh Tim kman who's a
- 33:47company uh representative um next to him
- 33:51is Ryan Rael who's a summer associate at
- 33:54CAC Rock and then finally is our witness
- 33:56James Carlson
- 33:58um judge and and and to the parties this
- 34:01is a this is a this is a room I've used
- 34:03many times with zoom unfortunately I
- 34:06we've had a new camera placed in here
- 34:08and I have never worked with this camera
- 34:10before as you can see it is doing some
- 34:12strange things um I don't think it's
- 34:14going to interfere with the testimony
- 34:17today it during a break I might ask our
- 34:19it people to come in here and just kill
- 34:22it uh we'll use a normal camera so
- 34:24anyway I apologize for this zooming in
- 34:26and zooming out well and don't worry I
- 34:29gu say when it gets to my turn to talk
- 34:30I'll tell you a few things that I have
- 34:32going on here so certain certainly you
- 34:35you're you're absolved of all camera
- 34:38incidents uh as I get over mine but good
- 34:40morning and good morning to everyone
- 34:43there good morning it's Michelle Singer
- 34:45Nelson appearing on behalf of the
- 34:47utility consumer advocate office good
- 34:51morning good
- 34:53morning good morning this is Abby
- 34:56briggerman of the law firm of Holland
- 34:57and I'm appearing on behalf of the
- 34:59Colorado cable telecommunications
- 35:01Association or
- 35:02CCTA good morning good
- 35:06morning and good morning your honor
- 35:08Tracy Alem from Ireland Stapleton and
- 35:10I'm appearing on behalf of larer
- 35:13emergency telephone Authority and its
- 35:15corporate representative Kimberly cult
- 35:18uh is participating and signed in and
- 35:21then I also represent the Colorado
- 35:24Council of authorities Inc um and it is
- 35:28represented through the representative
- 35:30Andrew Damron who will join us this
- 35:32afternoon all right good
- 35:36morning Joseph bener on behalf of best
- 35:40911 I represent the boulder Regional
- 35:42Emergency Telephone Service Authority uh
- 35:45Bart Miller is also online he represents
- 35:49Douglas County and El Paso teller
- 35:51emergeny telephone
- 35:53associations good morning gentlemen
- 35:58good morning your honor I'm Bart Miller
- 36:00with Collins Cole and I'm representing
- 36:02the parties Mr Ben Kirk just indicated
- 36:05okay good
- 36:09morning it's my turn good morning your
- 36:11honor assistant Attorneys General Justin
- 36:14Cox and Josh Horman with the Attorney
- 36:17General's office on behalf of trial
- 36:18staff for the Public Utilities
- 36:20Commission good good morning Mr coxon
- 36:22you're lucky we last you knew there was
- 36:23no one left I I was going to give
- 36:25everyone an A+ for remembering where
- 36:27they were in the lineup that I gave so
- 36:29good job um real quickly I'll tell you
- 36:32uh we have three hearings that are going
- 36:33on today with a commission and we have
- 36:36one Legal Assistant who is incredibly
- 36:39good and Incredibly kind and incredibly
- 36:41wonderful and I incredibly don't want
- 36:43her to to hate me forever so what we are
- 36:46going to do unfortunately is we're going
- 36:48to take a break for lunch at 11:00 am.
- 36:50we'll probably take one for an hour and
- 36:52a half I apologize for that but there's
- 36:54some public hearings that are going to
- 36:55be starting at that time uh I want to
- 36:57make sure that she's able to do that and
- 36:59um she's going to be popping back and
- 37:02forth if something happens on that so
- 37:04figure we're going to take it about 11:
- 37:06um also uh if there's one thing that I
- 37:09want less uh than having my Legal
- 37:12Assistant hate me I don't want my court
- 37:14reporter to hate me so uh I'm going to
- 37:16check with her at about 10 or 10:15 and
- 37:18see if we need to take a little break I
- 37:20normally take a break about an hour to
- 37:22an hour and a half into to a hearing so
- 37:24I'm going to check with her so um who's
- 37:27ever doing questioning at that time
- 37:29realize I might stop and break and
- 37:31around that
- 37:33time um what else I have I also got a
- 37:35message that my court reporter might be
- 37:37having um electrical issues or excuse me
- 37:40Wi-Fi issues that might happen in her
- 37:42neighborhood while she's doing this
- 37:43today that was one of the things that
- 37:44popped up when I was uh getting ready
- 37:47there so hopefully nothing will happen
- 37:48there but if it does uh we might have a
- 37:50Interruption that way so I just wanted
- 37:51to tell you that um now I'm going to do
- 37:55my housekeeping stuff uh we are
- 37:57conducting this hearing utilizing
- 37:59electronic pre-filed exhibits a
- 38:01spreadsheet has been prepared to
- 38:02navigate documents pre-filed in the
- 38:04commission's administrative record the
- 38:06spreadsheet indicates the latest
- 38:08versions filed at this point in time the
- 38:10spreadsheet has been marked as hearing
- 38:12exhibit 900 it reflects the date of the
- 38:14latest filed version as it appears in
- 38:17the commission's administrative record a
- 38:19title reference for hearing exhibits
- 38:20that will be utilized during the hearing
- 38:22and the titles of the hearing exhibit as
- 38:24reflected in the commission's records
- 38:26because attachments to testimony are
- 38:27part of the hearing exhibits exhibit
- 38:29references to attachments to the
- 38:31testimony will include reference to the
- 38:32hearing exhibit I would like to ask
- 38:35parties referring to an attachment to a
- 38:36pre-filed exhibit to reference both the
- 38:38exhibit number and the attachment so for
- 38:40instance here in exhibit 100 attachment
- 38:42whatever that attachment is so Legal
- 38:45Assistant can find it real quickly um
- 38:48any item listed in the spreadsheet is
- 38:50admitted into evidence will be admitted
- 38:52by administrative notice upon the
- 38:53existing filing referenced in the
- 38:55commission's file as such Those portions
- 38:58of the administrative record would
- 38:59become part of the evidentiary record
- 39:01fact being administratively noticed is
- 39:02that the electronic pre-file copy of
- 39:04administrative record is the content of
- 39:05the otherwise admissible exhibit being
- 39:07admitted so um if you don't know these
- 39:11sering before it's a common principle we
- 39:12normally do it's just the uh spreadsheet
- 39:14that you got uh emailed to you on Friday
- 39:17and what the legal assistant uses to
- 39:18reference through but it does become
- 39:20part of the record on that it's exhibit
- 39:22900 um and so if there's no objection
- 39:25I'm going toit into the record exhibit
- 39:26900
- 39:28don't hear any exemptions
- 39:31um I will then ask the the last thing I
- 39:34got because I want to get us going um do
- 39:37we have any stipulations to the
- 39:38admission of it
- 39:42exhibits I'm guessing we
- 39:46don't are we Frozen up I'm frozen up
- 39:52oh I lose anybody no no stipulations
- 39:57judge we did not reach any stipulations
- 39:59although we didn't reach any
- 40:00disagreements as well I hopefully we can
- 40:02get make this moveth okay all right
- 40:05that's all I got uh there any uh
- 40:06preliminary matters for any of the
- 40:09parties uh did I just one preliminary
- 40:12matter I was trying this morning to
- 40:14upload an additional potential exhibit
- 40:16to box.com and uh I kept getting an
- 40:18error I didn't I don't know if it's my
- 40:21on my end or if it's it's if box.com
- 40:24site is been closed I was wondering if I
- 40:27could email it to your assistant and
- 40:29perhaps um he or she could upload it to
- 40:33our box.com account for
- 40:40us let's see M Federico do you want to
- 40:43do it that way or how would you like
- 40:44that D handle that um can you remind me
- 40:47what what party it is oh this is Lumen
- 40:51Lum problem yeah it's definitely not
- 40:55down I've been in it this morning and um
- 40:57I've gotten gotten alerts from other
- 40:59folks adding things um what I see
- 41:03several exhibits in your box what number
- 41:05is it that you're looking for it would
- 41:06be
- 41:08110 ah no that one's not there
- 41:13um sure we can do it that way do you
- 41:17have the capability to to do it for us
- 41:19you think uh yes okay I appreciate that
- 41:23it'll be um like the sooner you can do
- 41:26it the better it's it'll be hard for me
- 41:28to upload it while you're all doing
- 41:30testimony and asking for other exhibits
- 41:32so might be do it the better are you
- 41:36gonna need it before lunch we're taking
- 41:38remember we're taking lunch at
- 41:3911: uh yes uh if yes I believe so so I'm
- 41:44setting it right
- 41:48now all right well you do that is there
- 41:50any other periment matters you have
- 41:58anything else not for us
- 42:02okay your honor staff has one
- 42:04preliminary matter um we would just
- 42:07request U for our staff witness Jennifer
- 42:10Kirkland uh to be able to conduct a very
- 42:13brief at most five to 10 minutes
- 42:15hopefully less uh direct of her this is
- 42:18to respond to centur Links revised
- 42:21supplemental direct testimony and
- 42:23attachments that were filed after answer
- 42:26testimony deadline
- 42:31C link if you have any objection to that
- 42:33no okay um since centr link has no
- 42:36objection I'll allow thank you excuse
- 42:41me okay yes yes I like the same um
- 42:46opportunity with respect to witness
- 42:48Kimberly cult uh to address very narrow
- 42:52questions related to um the supplemental
- 42:54direct testimony that was filed after
- 42:56her or testimony was file all right when
- 42:59you call her for a witness then uh you
- 43:01get an extra I don't know five or I
- 43:03don't want another I don't want two
- 43:04hours worth of direct testimony please
- 43:06oh no
- 43:08no will not go over big um I do have a
- 43:12few other preliminary matters your honor
- 43:14sure um we were advised on on Tuesday of
- 43:19a a switch of Sentry links witness uh he
- 43:22will not be Steve Delo he will be Jim
- 43:24Carlson and I don't know if the uh your
- 43:28honor has had the opportunity to be
- 43:31notified of that um but we don't know
- 43:34the basis or the reasons so we take no
- 43:36position we can't State whether there's
- 43:38good cause
- 43:40for it's not it's not unusual um in our
- 43:44proceedings to have some adopt the
- 43:45testimony of of someone so um I didn't
- 43:48see it I don't if you I
- 43:51mean if he's not able to answer anything
- 43:53on on cross-examination it's certainly
- 43:55going to taint the ability his testimony
- 43:58so okay we'll see if you have no
- 44:00objection I mean i' probably allow it
- 44:02anyway but okay and then with respect to
- 44:06the exhibits of Century Link um there is
- 44:08some confusion on my part about what was
- 44:11publicly filed and what is
- 44:13confidential and so my understanding and
- 44:16I just wanted to verify that for the
- 44:18record that exhibit 100 which is the
- 44:21direct testimony of Steve
- 44:23Doo that was filed publicly it is not
- 44:27confidential and
- 44:29then uh exhibit 100 attachment
- 44:35sd1 is the second amended Improvement
- 44:38application that was also filed publicly
- 44:42um in February of 2024 so that is not
- 44:46confidential and then the rest of
- 44:48exhibit 100 would be and then with
- 44:51respect to exhibit 101 that's the
- 44:53supplemental direct testimony that was
- 44:56filed
- 44:57publicly and so that is not
- 45:00confidential and my understanding is
- 45:02that exhibit 101 attachment
- 45:06sd4 was also filed publicly and is not
- 45:09confidential so for purposes of
- 45:11Expediting examination I just wanted to
- 45:14make sure that there was uh agreement on
- 45:16that well all files are filed publicly
- 45:19and then if there's confidential
- 45:20information there's also confidential
- 45:22filing on it I assume that that's the
- 45:24case in each one of these I have not
- 45:25examined them uh to make sure but when
- 45:28uh an exhibit's being used I mean and
- 45:30that's one thing I I do want to mention
- 45:31to everyone too don't forget um we do
- 45:33have confidential stuff I know filed in
- 45:35this proceeding before you ask any
- 45:37questions about any um confidential
- 45:40information please tell me ahead of time
- 45:42so we can take that uh proceeding off
- 45:45line those questions but
- 45:49um is there uh anything anything that
- 45:53from centry length that you heard
- 45:54incorrectly this Miss old Meer said no
- 45:57judge I I believe we agree with uh Miss
- 46:00old me's um characterization just with
- 46:03the when you talk about the testimony
- 46:06being filed publicly it's just the
- 46:08testimony it's not the attachments and I
- 46:10assume that's what she what she was
- 46:11referring to um so yes it's just a
- 46:14testimony both public uh sd1 to um to to
- 46:19exhibit 10100 also is public but the
- 46:23attachments to that document uh sd1 D1
- 46:27sd1 D2 those are still confidential and
- 46:29I think that's I think that's what m was
- 46:32referring to so yeah I think we're all
- 46:34on the same page okay good enough all
- 46:37right um anybody have anything else
- 46:39before Oh man one
- 46:42more I'm trying to expedite the
- 46:44presentation of evidence but the FCC
- 46:47audit um that is a confidential
- 46:50attachment in this case um it's
- 46:54confident exhibit 100
- 46:58attachment
- 47:00sd1
- 47:02[Music]
- 47:04d8c um that was actually filed publicly
- 47:08in a different
- 47:10proceeding um it was filed publicly in
- 47:1323m
- 47:150236 t on June 3rd 2024 at Pages 24
- 47:20through 28 the content is the same it's
- 47:24just that the formatting is different so
- 47:26it's actually legible and and one can
- 47:29read it um and so we would ask that uh
- 47:32your honor take administrative or
- 47:34judicial notice of of that uh filing in
- 47:3923m 0236 t Pages 2 24 through 28 and we
- 47:45did put that in our folder as exhibit
- 47:48601 do you plan on to uh planning to
- 47:51admit that or present that because it
- 47:55was filed publicly it just expedites we
- 47:57can put it up on the screen and use
- 47:59those pages um in discussion I don't
- 48:02know if there was an intentional waiver
- 48:04of confidentiality or not but I've got
- 48:06one version of the same document
- 48:08designated confidential that's hard to
- 48:10read and then one that was filed
- 48:12publicly that you can actually read well
- 48:16I I say are you if you plan on using
- 48:18that and want to admit that into an
- 48:20exhibit then I'll we'll do it that way
- 48:22if you don't then I'll take I don't I'm
- 48:24not going to take administrative notice
- 48:25of it and then also admit it as exhibit
- 48:27uh and then have it as a third exhibit
- 48:29too when centry link tries to get their
- 48:31exhibits in so uhy tell me how you want
- 48:34to handle it okay get there I only did
- 48:37that because I thought rule 1501
- 48:40subsection C required me to do it
- 48:42actually label it as an exhibit um so if
- 48:46your honor is willing to take judicial
- 48:48notice of it without it being um
- 48:51admitted I I mean if if you want to move
- 48:55for for administrative notes technically
- 48:57it's administrative notice here but uh
- 48:59if you want to move for administrative
- 49:00notice of that and you give it to the
- 49:01other parties uh and they know what's
- 49:03going on with it and I can see it uh I
- 49:05can do that but it's kind of hard for me
- 49:07to look to Grant administrative notice
- 49:10if you plan on using it as an exhibit in
- 49:12the hearing you can try and admit it
- 49:14that way um like I say my my my only
- 49:18worry is I don't want it admited three
- 49:20different ways um for the same document
- 49:23I just clutter up my my record if I do
- 49:25that so how you want to get it in and do
- 49:28it that way okay and as long as it gets
- 49:31in it gets in yeah and the same will
- 49:33hold true then I'll just email all of
- 49:34these to opposing Council now but it's
- 49:36things that the parties have referred to
- 49:39special investigation reports filed in
- 49:4123m 0145 T and 24
- 49:48m20t and so I'll email those which I
- 49:50marked as exhibits if there's no
- 49:52objection by opposing Council we'll
- 49:54we'll proceed at that but I can go ahead
- 49:56and proceed with my direct okay all
- 50:00right anything
- 50:04else not on behalf of and Away Your H
- 50:09okay not seeing anyone else with
- 50:11anything that being the case let's get
- 50:13started and Sentry Link may call the
- 50:15first
- 50:19witness thank you uh your honor um for
- 50:22our first witness we would call James
- 50:24Carlson Mr Carlson you raise your right
- 50:26hand for me you swear affirm tell the
- 50:29whole truth nothing but the truth on
- 50:30penalty of perjury I do all right sir is
- 50:34anyone there with you
- 50:37right uh is there anyone here with me
- 50:39yeah yeah the individuals mentioned
- 50:41already okay all right you don't have
- 50:43any notes or anything there to help you
- 50:44do you have any any documentation with
- 50:47you uh there's my my testimony Is Here
- 50:50Yeah
- 50:51and but not not uh uh not in front of me
- 50:55okay fantastic okay um and we'll go
- 50:59ahead with through direct oh thank you
- 51:02uh Mr Carlson Could you um identify your
- 51:06name again for the record and tell us uh
- 51:08by whom you're employed and what you do
- 51:11uh yes my name is uh James Carlson I
- 51:13also go by Jim my role as a senior
- 51:16director at um Cent or Lumen is to uh
- 51:22care for the customer experience of our
- 51:25Public Safety customers across the
- 51:26country so my uh my direct team that uh
- 51:31I am in charge of is responsible for the
- 51:35uh sales conversations that we have with
- 51:37customers I also work in a matrix
- 51:39management form with other individuals
- 51:42who are dedicated to Public Safety
- 51:44across the country Steve do is one of
- 51:47those individuals who leads our
- 51:48engineering team I work with Steve uh
- 51:51literally every day on topics of
- 51:53pertinent Public Safety I also work work
- 51:56with our customer care team our network
- 51:58operations center our um marketing
- 52:02business development um I've end in
- 52:04responsibility for the customer
- 52:07experience and uh by how long have you
- 52:09been employed by the company uh I've
- 52:11been employed with the company for 35
- 52:14years and uh how many of those years
- 52:17have focused on the public safety Market
- 52:19segment um nine years
- 52:21now um have you uh testified in
- 52:25commission proceedings before I have uh
- 52:28I have back at um the passage of the
- 52:31Telecommunications Act in
- 52:331996 uh I was a part of the external
- 52:36Affairs group at Sprint at the time uh a
- 52:39permutation of our company and involved
- 52:41in regulatory hearings across the
- 52:43country as Sprint sought to uh receive
- 52:46celect status and then really advocating
- 52:49uh competition across the
- 52:52country um can you give us some examples
- 52:55of some states that you testified in
- 52:57Missouri Minnesota Colorado California
- 53:01Massachusetts
- 53:02Arizona um
- 53:07um yeah so I think there's nine or 10
- 53:11states I testified
- 53:13before and uh finally could you uh give
- 53:15us your educational
- 53:17background uh my uh bachelor's degree is
- 53:20in computer science and my master's
- 53:22degree is in uh
- 53:25management um
- 53:28Mr Carlson let me refer you to what has
- 53:30been marked in this proceeding as
- 53:34exhibit 100 which is the direct
- 53:37testimony of Steve delude are you
- 53:39familiar with that document I am okay
- 53:41did you have um a role in participating
- 53:45in the um uh drafting of that testimony
- 53:50you know in my role at um in my role at
- 53:53Lum and given I'm responsible for the
- 53:56customer experience and and uh I I was
- 53:59aware that the testimony was being
- 54:01developed but I wasn't I didn't directly
- 54:03write
- 54:04it um have you um reviewed the testimony
- 54:09yes I have okay and uh again who is Mr
- 54:12Delo uh Steve Delo is a manager of sales
- 54:16engineering for Public Safety at Lumen
- 54:18so he leads a team of individuals to
- 54:21design Public Safety Solutions for our
- 54:24customers uh and why is Mr Delo not able
- 54:27to participate today he wasn't available
- 54:29this
- 54:30week um do you having read this um
- 54:36testimony Mark is exhibit 100 do you
- 54:38adopt this testimony as your own I
- 54:41do at this time honor we would move to
- 54:43admit the test direct testimony of Steve
- 54:45Delo which is marked as uh hearing
- 54:48exhibit
- 54:52100 any objection to uh exhibit 100
- 54:57you're none so your honor oh yeah sorry
- 55:01had that already been mitted as part of
- 55:04exhibit 900 no it's not technically we
- 55:07still got to go through the whole the
- 55:08whole deal the
- 55:09900 it's it's a weird kind of deal but
- 55:13everything has to still be admitted so
- 55:16um 100 shall be
- 55:20admitted um Mr Carlson let me draw your
- 55:23attention to what we've marked as
- 55:25exhibit 100 101 uh entitled the
- 55:29supplemental um direct testimony of
- 55:31Steve Delo are you familiar with that
- 55:33document I am okay um and have you read
- 55:36it I have okay and uh again did you
- 55:40assist in the preparation of that uh
- 55:43supplemental direct testimony again I
- 55:46was I was aware that the testimony was
- 55:48being developed uh but I wasn't directly
- 55:50involved in writing
- 55:52it um having read the uh supplemental uh
- 55:56direct testimony uh do you adopt this
- 55:58testimony as your own I do you're
- 56:01honored this time we would move to admit
- 56:04exhibit
- 56:05101 any objection to
- 56:08101 hearing none it shall be
- 56:12admitted
- 56:20um one second
- 56:32I'm sorry for this I
- 56:37um the only other document I want to
- 56:40have him refer to right now is the one
- 56:42that unfortunately I was not able to
- 56:44upload so I have um sent it to feder
- 56:47Rico and uh with now the appropriate
- 56:51header hopefully on it it's not it's not
- 56:53a confidential document um I
- 56:57I'm go ahead I haven't received it yet
- 57:00um I
- 57:03know I I I'm just G ask a few questions
- 57:07generally before we get to that document
- 57:09so I think we can save some
- 57:11time what you I you can turn them over
- 57:14for cross- examination if you want I me
- 57:17and then come back and come back yeah um
- 57:20okay I mean I'm not I'm not sure I'm not
- 57:22sure how long it's going to take to get
- 57:23this document in all get it it over and
- 57:27I don't want to wait 10 minutes to do
- 57:28that I'd kind of like to do something in
- 57:29the meantime
- 57:32understood understood why don't I just
- 57:35so have him describe the nature of the
- 57:37change that's going to be reflected in
- 57:38that document then we can turn them over
- 57:40for cross and then bring them back
- 57:41that's fine it sounds good okay uh Mr
- 57:44Carlson in connection with your
- 57:45preparation of the of the testimony did
- 57:48you uh notice any errors in calculations
- 57:52of the monthly recurring
- 57:54costs there there were some changes
- 57:57required to the cost of the ethernet
- 57:59project and those uh changes resulted in
- 58:02bringing the cost down a little bit and
- 58:05so that changed the the uh uh the MRC
- 58:09rate uh to be down as
- 58:11well and in the in in the document that
- 58:14I show you is that is that what's going
- 58:16to be reflected in there
- 58:18correct all right uh your honor thank
- 58:21you I thank everyone for their patience
- 58:22on this and i' I'd like to Tender Mr
- 58:25Carlson cross uh and maybe you know at a
- 58:29good point we'll bring up 110 again or
- 58:31this this document up here which we're
- 58:33going to Mark into to at 110 and uh and
- 58:35have them talk about it then have them
- 58:37turn back to R back to cross okay that
- 58:40sounds good that's Miss uh your honor I
- 58:43have a a clarifying question when
- 58:45exhibit 100 was offered does that
- 58:47include all attachments it sure does
- 58:50okay and same with exhibit
- 58:52101 thank you
- 58:56all right your honor before we move on
- 58:59um and maybe just a clarifying I don't
- 59:02think we've seen this latest document
- 59:04yet no you haven't I can guarantee you
- 59:07haven't if if it could be sent here it's
- 59:10kind of hard to cross on it if we
- 59:11haven't seen it yet yeah get admitted
- 59:15yeah as soon as as soon as we get it up
- 59:17we'll do that but but at the very least
- 59:19he's explained what it is so you know
- 59:21what it is and you can keep that in your
- 59:22mind no as far as what it concerns is
- 59:24what I'm saying sure so and and if
- 59:26that's all you're going to cross on this
- 59:28going to be a short day sure but uh but
- 59:31uh since you probably got other things
- 59:33to cross on you can start on those uh
- 59:35but you can't Mr Cox because you're not
- 59:37first so uh M I believe you are first is
- 59:42that not
- 59:44correct so you may
- 59:47proceed thank you your honor um good
- 59:51morning Mr Carlson my name is Tracy
- 59:53older and I represent um two parties in
- 59:56this proceeding Lita the lmer emergency
- 59:59telephone Authority and ccoa the
- 1:00:01Colorado Council of authorities Inc um
- 1:00:05we've never met correct no we haven't
- 1:00:07but it's nice to meet you now nice to
- 1:00:09meet you as well remotely remotely
- 1:00:13exactly um you flew to Colorado for
- 1:00:16purposes of this proceeding I did and
- 1:00:19your testimony correct yes the the
- 1:00:23topics that are addressed in exhibit 100
- 1:00:27those are that's the direct testimony of
- 1:00:29Steve Doo the those topics are relevant
- 1:00:32to this proceeding correct yes they are
- 1:00:36and one of those attachments uh that
- 1:00:38would be attachment sd-1 that's the
- 1:00:42actual second amended application in
- 1:00:44this proceeding correct correct and the
- 1:00:48topics addressed in there are relevant
- 1:00:49to this proceeding aren't they they are
- 1:00:53and the same holds true with exhibit 101
- 1:00:56and its attachments the topics addressed
- 1:00:58therein are relevant to this proceeding
- 1:01:00correct they are okay going back to your
- 1:01:04qualifications and um I I heard Lumen
- 1:01:07and I heard Century Link who is your
- 1:01:11employer well um the the employers Lumen
- 1:01:17uh that's the the name we go by when we
- 1:01:20rebranded from centry link to lumen in
- 1:01:22my role I um started using Lumen all the
- 1:01:25time
- 1:01:26it's a little bit of a uh a twist for me
- 1:01:30in in this particular proceeding to have
- 1:01:32to reference Central Link again but uh I
- 1:01:36work for
- 1:01:38Lumen you work for Lumen and that can
- 1:01:41you state the full name of the legal
- 1:01:43entity
- 1:01:45Lumen um you know I'm not sure the full
- 1:01:48legal name to be honest okay
- 1:01:52um we are here as a representative of
- 1:01:54what company
- 1:01:58uh I'm here as a representative of of
- 1:02:00Sentry Link uh doing business as
- 1:02:04lummen the basic emergency service
- 1:02:07provider in Colorado is known as Quest
- 1:02:11Corporation doing business as Century
- 1:02:14Link QC are you familiar with that
- 1:02:17entity I am I am so what relation does
- 1:02:21that entity have to the uh year
- 1:02:23references to Century Link and lumen
- 1:02:27um uh Quest is
- 1:02:30a a um legal entity that uh centy link
- 1:02:36required um Cent link rebranded to Lumen
- 1:02:40um different legal entities from my
- 1:02:43point of view all part of the same
- 1:02:46company so if I understand correctly
- 1:02:48Quest Corporation doing business as
- 1:02:51centry link QC is the same as Lumen
- 1:02:55Technologies Inc and Century Link ink
- 1:02:58correct
- 1:03:10correct uh how long have you been in the
- 1:03:12Telecom industry
- 1:03:14sir uh since 1987
- 1:03:27and with respect to Quest Corporation
- 1:03:31doing business as Century Link QC that's
- 1:03:35a publicly traded entity correct yes it
- 1:03:42is is Lumen Technologies Inc a separate
- 1:03:46publicly traded entity no
- 1:04:00in uh its role um I for purposes of this
- 1:04:05proceeding can we refer to Quest
- 1:04:08Corporation doing business this Sentry
- 1:04:10Link QC as Sentry Link sure okay um
- 1:04:15Sentry Link wears multiple hats uh it's
- 1:04:18a network provider correct correct it's
- 1:04:22a local provider of voice and
- 1:04:24broadband correct it's a national and
- 1:04:27international Network
- 1:04:29operator correct and it's a wholesale
- 1:04:32services provider that's
- 1:04:35correct uh it also enters into
- 1:04:37interconnection agreements with uh
- 1:04:39originating service providers we
- 1:04:43do and that's where sentury link
- 1:04:46transports other carriers traffic for a
- 1:04:49fee is that
- 1:04:51correct correct that would be an example
- 1:04:53of that yes
- 1:04:56what portion of centur links business
- 1:04:59Nationwide relates to basic emergency
- 1:05:03service I'm not aware of what that
- 1:05:05portion
- 1:05:06is would you agree with me that with
- 1:05:09respect to all of the other um hats we
- 1:05:12described 911 or basic emergency service
- 1:05:15as a very small
- 1:05:18portion um well it depends on definition
- 1:05:21small uh but it's U it's one piece of a
- 1:05:26multi-billion dollar
- 1:05:27company but you have no idea what
- 1:05:31approximate portion or size piece I I
- 1:05:35don't know the exact percentage but it
- 1:05:37would um for reference real quickly here
- 1:05:40not that I think that it's wh relevant
- 1:05:42but are you talking about Nationwide
- 1:05:44because I thought your question listed
- 1:05:46Nationwide as opposed to Colorado I'm
- 1:05:48not sure why I care Nationwide but uh
- 1:05:51what are you referencing here Colorado
- 1:05:52or Nationwide uh I was going to do
- 1:05:54Nationwide first and then Colorado your
- 1:05:56honor why do I care about
- 1:05:58Nationwide um it relates to the services
- 1:06:01that flow into Colorado the transport
- 1:06:04Network which is Nationwide and the
- 1:06:06arrangements with other carriers am I
- 1:06:09approving a nationwide carrier service
- 1:06:10or something in this proceeding that I'm
- 1:06:12not aware of no you're we're addressing
- 1:06:15projects that specifically relate to
- 1:06:17transport technology and in the state of
- 1:06:20Colorado right and the request that 100%
- 1:06:23of those costs be allocated to emergency
- 1:06:26service basic emergency
- 1:06:33service so so my question was
- 1:06:36approximately uh Mr Carlson
- 1:06:38approximately what portion of Century
- 1:06:41Link's business relates to 911
- 1:06:47Nationwide um it's a it's a small small
- 1:06:50percentage but but I don't know the
- 1:06:52exact percentage it's a small percentage
- 1:06:55and then what about in
- 1:06:56Colorado a even smaller percentage
- 1:06:59relative to
- 1:07:06Nationwide
- 1:07:09um so you're familiar with Colorado's
- 1:07:11EET service I am and and U Century Links
- 1:07:16Colorado bees Network I
- 1:07:22am uh you're familiar with rule 2143
- 1:07:25that brings us to the application at
- 1:07:27issue I
- 1:07:34am uh when when did you um become aware
- 1:07:39that you would be the witness for
- 1:07:40Century Link at today's hearing U
- 1:07:43approximately three weeks ago
- 1:07:59you have knowledge of the monthly
- 1:08:01recurring charges that are in current
- 1:08:03tariff 25 governing the state of
- 1:08:06Colorado I
- 1:08:10do and you are you familiar with the
- 1:08:13additional services and features that
- 1:08:16Century Link uh indicated it intends to
- 1:08:19offer through a tariff Amendment at some
- 1:08:21point in
- 1:08:232024 I am
- 1:08:29is it an accurate statement that none of
- 1:08:31the additional services and features
- 1:08:33being
- 1:08:35contemplated uh are dependent upon the
- 1:08:38approval of any project in this second
- 1:08:43amended Improvement plan
- 1:08:47application um the scope of these
- 1:08:49projects are are focused on um um uh you
- 1:08:55know off inner office capabilities or or
- 1:08:58um uh
- 1:09:01resiliency um and uh upgrading the local
- 1:09:05Last Mile Loops to ethernet out to the
- 1:09:08paaps um the other projects that we're
- 1:09:12anticipating would be added to
- 1:09:15that okay so the last mile diversity
- 1:09:18portion of the ethernet upgrade project
- 1:09:23the additional services and features are
- 1:09:24dependent upon approval of
- 1:09:27that uh not necessarily no um the
- 1:09:32there's a services that we will provide
- 1:09:35uh for GIS data management um that um
- 1:09:40would um um wouldn't be dependent on
- 1:09:43that okay but other additional services
- 1:09:47like text to 911 or the gis routing
- 1:09:51those are dependent upon approval of the
- 1:09:53last mile upgrade proposed here
- 1:09:57um not that I'm aware of no
- 1:10:05okay um when you review the second
- 1:10:07amended application which is um exhibit
- 1:10:12100 attachment
- 1:10:15SD 1 c um Pages 1 through four of that
- 1:10:20refer to the application that centry
- 1:10:22link filed in
- 1:10:232023 and then withdrew correct correct
- 1:10:27and then Pages five and six of that
- 1:10:29exhibit refer to the meetings with the
- 1:10:31stakeholders that were held in the fall
- 1:10:33of
- 1:10:342023 before the amended application was
- 1:10:37filed in 2024 true
- 1:10:41correct and centry Lincoln's taking the
- 1:10:43position that the content of this um
- 1:10:46second amended application is based on
- 1:10:49feedback received from the stakeholders
- 1:10:52and information available from centur
- 1:10:54link engineers
- 1:11:10correct have you read staff's testimony
- 1:11:13exhibit
- 1:11:14400 I have have you read Lita's
- 1:11:17testimony exhibit 600 in its attachments
- 1:11:21I have have you read CCA OA as answer
- 1:11:24test in its attachments exhibit 700 I
- 1:11:33have is it an accurate statement that
- 1:11:36the 2024 amended application filed
- 1:11:38February 15 2024 asked that 100% of the
- 1:11:43$7.4
- 1:11:44million uh improvements be paid for
- 1:11:48through the Improvement plan application
- 1:11:51process that's accurate
- 1:11:57are you aware of a filing that sentury
- 1:12:00link made just three days prior in a Ru
- 1:12:02making in
- 1:12:04Colorado
- 1:12:0823577 I'm not familiar with that
- 1:12:11fent um is it an accurate statement if
- 1:12:15it was made on February 12
- 1:12:172024 in a filing made in 23r
- 1:12:220577 on page 4
- 1:12:25that events that occur in the local
- 1:12:28network regardless of which osp's
- 1:12:32network are not basic emergency service
- 1:12:36events and are not subject to commission
- 1:12:42regulation um I'm not I'm I'm not
- 1:12:46familiar with the commission regulation
- 1:12:48so I'm not really in a position to
- 1:12:50answer that
- 1:12:56uh your honor we would ask for
- 1:12:58administrative notice of Century Links
- 1:13:00filing in
- 1:13:0223r 0577 t on February 12th 2024 for
- 1:13:07purposes of sentur Link statements made
- 1:13:10in that proceeding that this witness is
- 1:13:12not familiar
- 1:13:14with Mr Carlson did you have anything to
- 1:13:16do with that
- 1:13:17proceeding I I did not okay um is there
- 1:13:21any objection to administrative notice
- 1:13:23of uh the file referen by m
- 1:13:27old yeah I believe so judge on relevance
- 1:13:30I don't obviously the witness isn't
- 1:13:33familiar with the testimony so there's
- 1:13:34no tie in with this witness if there's
- 1:13:37something in that particular other
- 1:13:39proceeding that has some bearing on this
- 1:13:41proceeding it hasn't come out yet
- 1:13:43Perhaps Miss old me can bring it out
- 1:13:44with her own witness but at this point I
- 1:13:47don't see any relevance between the
- 1:13:48statement in a different proceeding I
- 1:13:50haven't seen much relevance in this
- 1:13:51testimony altogether frankly up to this
- 1:13:53point but certainly not with respect
- 1:13:55back to a different
- 1:13:56proceeding alire what do you say to that
- 1:13:59I haven't seen I'm not sure what this
- 1:14:01document reports to say or would it be
- 1:14:04better through your own witness yeah
- 1:14:06that proceeding relates to the
- 1:14:09clarifying the outage rules for basic
- 1:14:11emergency service in Colorado it's
- 1:14:12critically important it ties into the
- 1:14:15whole point of an improvement plan
- 1:14:17application the intent and purpose
- 1:14:19behind rule
- 1:14:212143 and it's this entity's own
- 1:14:23statements that we tend to use against
- 1:14:26the entity when it's asking that 100% of
- 1:14:29the cost of a certain project be
- 1:14:32allocated under the the basic emergency
- 1:14:36Improvement plan process which goes down
- 1:14:38to rates that ultimately Colorado
- 1:14:40Citizens will pay through that Statewide
- 1:14:43sear charge whether something is an OSP
- 1:14:46Network issue and should be paid for the
- 1:14:48company through its normal
- 1:14:50operations um versus bees is a critical
- 1:14:53issue in this case and uh the relevancy
- 1:14:56will be established uh throughout
- 1:14:59throughout this proceeding and we'll tie
- 1:15:01it together in the statements of
- 1:15:02position obviously your honor can reject
- 1:15:05the positions of of my clients Lita and
- 1:15:09ccoa but the relevancy is critically
- 1:15:12important and should be admitted under
- 1:15:14the administrative procedures Act and
- 1:15:17the rules permitted therein um and you
- 1:15:21know we we ask that you take
- 1:15:23administrative notice ENT Link's own
- 1:15:25statements in a commission proceeding
- 1:15:30relating to outages affecting the bees
- 1:15:34Network since it is centy links um Fs in
- 1:15:38a proceeding before the commission um if
- 1:15:42you tell me again exactly what the give
- 1:15:43me the
- 1:15:44uh um proceeding and what pages and or
- 1:15:49paragraphs included in there that you'd
- 1:15:51like administrative notice of certainly
- 1:15:53your honor it's proceeding
- 1:15:5623r - 0577
- 1:15:59T it was Central links uh comments filed
- 1:16:03on February 12th
- 1:16:062024 and uh the relevant section is on
- 1:16:09page four P one okay all right I'll take
- 1:16:13administrative notice of Century Links
- 1:16:16filing on
- 1:16:1812224 page four in proceeding 23r -
- 1:16:230577 is that correct
- 1:16:25thank you your honor
- 1:16:34okay I'm just triple checking my my
- 1:16:36citation to page four that's fine that's
- 1:16:39fine it would be Pages three onto page
- 1:16:43four we'll say three and four I I hate
- 1:16:46bring I hate bringing a whole thing in
- 1:16:47if it's like 50 or 60 Pages no it's no
- 1:16:51that's that's what I mean so that is
- 1:16:52what the relevant part okay um Mr
- 1:16:55Carlson we're using an acronym uh OSP
- 1:16:58can you just explain um what what what
- 1:17:01is an OSP so the acronym is originating
- 1:17:05service
- 1:17:06provider uh in the context of 911 it is
- 1:17:10the organizations that um originate a
- 1:17:13911 call could be a local exchange
- 1:17:15carrier could be a wireless carrier
- 1:17:18could be a provider of VO Services uh
- 1:17:21it's any um provider that uh originates
- 1:17:25the 911 call that then has to uh
- 1:17:28interface with the 911 Network to get to
- 1:17:31a public safety answer point or be
- 1:17:36set um or get it to a point where it
- 1:17:39hands off the call to the basic
- 1:17:41emergency service provider for
- 1:17:43Colorado um the the bsp being defined as
- 1:17:47the 901 provider
- 1:17:50yes
- 1:17:53um in your
- 1:17:55um answer I don't know if you use the
- 1:17:57acronym Le or e um but what is a a Le or
- 1:18:02an ilc so uh Al is a local exchange
- 1:18:06carrier um uh also known as an EC um a
- 1:18:11local exchange carrier is a organization
- 1:18:14that has historically provided local
- 1:18:16exchange service um in its franchise
- 1:18:20territories in the state so Quest
- 1:18:22operated as a local exchange carrier
- 1:18:25uh in the State Central Link operates as
- 1:18:27a local exchange carrier in Colorado um
- 1:18:31and the the purpose of a local exchange
- 1:18:33carriers to originate and terminate
- 1:18:34local
- 1:18:38traffic thank you um in some of the
- 1:18:42documents that have been admitted
- 1:18:43there's a reference to um other acronyms
- 1:18:46and I just want to make sure that for
- 1:18:48purposes of when we tie this all
- 1:18:49together they're understood terms what's
- 1:18:52a pop a point of
- 1:18:56presence and what is a point of presence
- 1:18:59um you know a point of presence is where
- 1:19:02um um two Network facilities meet
- 1:19:05there's lots and lots of examples of
- 1:19:07Pops um but it is essentially it's where
- 1:19:10two two Network facilities exist in a
- 1:19:13centralized location approximately how
- 1:19:16many points of presence exist in
- 1:19:19Colorado uh I'm not sure what that the
- 1:19:21for the purpose I don't know short
- 1:19:24answer is I not aware of what that
- 1:19:25number is there would there could be a
- 1:19:27range of Pops in uh in Colorado uh there
- 1:19:31could be uh pops for o osps to uh uh to
- 1:19:36integrate with uh the 911 Network there
- 1:19:38can be pops for uh inter interconnecting
- 1:19:42with longdistance companies U there's a
- 1:19:45range of Pops that could exist okay are
- 1:19:48you able to answer how many pops exist
- 1:19:51for purposes of entry into the basic
- 1:19:54mergency service network in Colorado I'm
- 1:19:56not aware of what that number is
- 1:20:00no
- 1:20:02um what are meat
- 1:20:04points you know a meat point is a
- 1:20:07another type of um of um a a place where
- 1:20:13Network facilities come together um it
- 1:20:16it you know a pop is U you know is
- 1:20:19generally a more comprehensive place
- 1:20:21where multiple players or multiple
- 1:20:24organizations can bring their networks
- 1:20:26together uh whereas a meat point is is
- 1:20:29typically one one uh carrier to another
- 1:20:32or one telecommunication provider to
- 1:20:36another
- 1:20:38okay um where is Denver
- 1:20:41[Music]
- 1:20:42Maine um that I don't know the physical
- 1:20:45address in the Denver area okay what is
- 1:20:48Denver main um Denver Maine is a central
- 1:20:52office in Denver that the company owns
- 1:20:55and manages a range of telecommunication
- 1:20:58services are uh delivered either
- 1:21:01directly out of Denver main or those te
- 1:21:05telecommunication Services come through
- 1:21:07that location to be um transported to
- 1:21:12other parts of the
- 1:21:13state is it an aggregation point for the
- 1:21:17basic emergency service
- 1:21:19network um I'm not sure if it is I I
- 1:21:22don't know for sure on that
- 1:21:32um few more terms I want to talk about
- 1:21:34groom or grooming what does that mean
- 1:21:37you know grooming is a process that
- 1:21:39Network companies do over time to um um
- 1:21:44evaluate their networks to make changes
- 1:21:47to where uh circuits are writing on
- 1:21:50different parts of the network it's a um
- 1:21:53an ongoing process to um um make sure
- 1:21:56that the networks are defined as
- 1:21:58efficiently as
- 1:22:00possible is it possible that um a
- 1:22:05facility cannot carry 911 traffic
- 1:22:09because it's not groomed for 911
- 1:22:13traffic well you don't really groom for
- 1:22:15a particular type of traffic um you you
- 1:22:19groom for the the the way circuits are
- 1:22:23uh designed in into a network
- 1:22:25architecture so I I'm not not sure how
- 1:22:27to answer that question okay so you're
- 1:22:30telling me there's no specific grooming
- 1:22:32needed that's specific for 911 it's just
- 1:22:35call traffic so um 911 circuits are
- 1:22:39Tagged so we know that they're 911
- 1:22:41circuits um there's attention paid uh in
- 1:22:44the grooming process to make sure that
- 1:22:45if the circuit that we're looking at is
- 1:22:47a 911 circuit that it is um treated
- 1:22:50accordingly but there isn't a specific
- 1:22:54groom process for
- 1:22:56911 there can be a specific grooming
- 1:22:58process though for circuits that are
- 1:23:00designated 911 circuits uh as a part of
- 1:23:04the grooming as a part of the grooming
- 1:23:06process 911 circuits could be
- 1:23:09evaluated hey Miss om yes sir you could
- 1:23:12you tell me what project talks about
- 1:23:15grooming um it's in the FCC audit which
- 1:23:18is um
- 1:23:21attachment exhibit 100 attachment that
- 1:23:24was my question my question is what
- 1:23:27project um it relates to the Sonet to
- 1:23:29ethernet
- 1:23:31project and and the outages related to
- 1:23:33that as well as um the equipment
- 1:23:36upgrade Lamar to Burlington that will
- 1:23:38need the equipment so that traffic can
- 1:23:41flow you're going to help me more if if
- 1:23:44when you're going down lines like this
- 1:23:46if you relate them to a project because
- 1:23:47that's what I'm looking it okay um I'll
- 1:23:51expedite this then and and ask these
- 1:23:54questions specific to the projects I
- 1:23:56mean not not that I'm not incredibly
- 1:23:57curious about everything that goes into
- 1:23:59the 911 system but uh I'm here about
- 1:24:02project yeah well let me ask Mr Carlson
- 1:24:06this question would you agree with me Mr
- 1:24:08Carlson that that 911 is extremely
- 1:24:12complex I would definitely agree with
- 1:24:14that and so it's important for purposes
- 1:24:17of someone um like a governing body or a
- 1:24:21peace app to understand that Network
- 1:24:24correct
- 1:24:26well um I think it depends on the level
- 1:24:28of understanding so um I've been with
- 1:24:31the company for 35 years I've learned a
- 1:24:34lot about telecommunications over the
- 1:24:36years um uh I I I don't have the same
- 1:24:39level of understanding as our Engineers
- 1:24:41do that that's their area of expertise
- 1:24:43so uh I I depend on them to have a level
- 1:24:47of understanding that um is way deeper
- 1:24:50than mine so when I think about like
- 1:24:52staff like Jennifer Kirkland or or even
- 1:24:55Daryl Branson individuals I've had a
- 1:24:56chance to speak with over the years I
- 1:24:59want them to have an understanding of at
- 1:25:03at the appropriate level of detail of
- 1:25:04how the 911 system in Colorado works but
- 1:25:08the question really gets to at what
- 1:25:10level of detail should that
- 1:25:12understanding exist and how how how much
- 1:25:16into the engineering components of it
- 1:25:18would we get one to
- 1:25:28um if we could please pull up um exhibit
- 1:25:32101 attachment sd4 which is not a
- 1:25:36confidential exhibit and turn to page
- 1:25:49three are these the projects that are at
- 1:25:52issue in the application that you are
- 1:25:54asking judge um Garvey to
- 1:25:57consider they are and so uh the total in
- 1:26:01the far right column bottom right is $
- 1:26:034.64 eight million correct correct and
- 1:26:08uh if you add look at the columns
- 1:26:10there's a total of six projects
- 1:26:13correct um correct and if you go to page
- 1:26:17two the proceeding
- 1:26:21page in the bottom uh chart what you are
- 1:26:26asking is in part judge gar consider
- 1:26:29approving this project using math for
- 1:26:32623 concurrent sessions over a 24mon
- 1:26:37recovery period
- 1:26:38correct um we're requesting recovery
- 1:26:41over 12 months um we've showed two
- 1:26:43options here 12 months and 24 months
- 1:26:47okay so you prefer the top chart not the
- 1:26:50bottom
- 1:26:51chart that's what we've requested okay
- 1:26:56and with respect to the top chart that
- 1:26:58increases the Statewide surch charge by
- 1:27:00over 5 cents
- 1:27:02correct yes and on the bottom chart uh
- 1:27:06that increases the uh Statewide 911 Sur
- 1:27:11charge uh to approximately three cents
- 1:27:13correct correct but neither one of these
- 1:27:17charts include the last mile diversity
- 1:27:19MRC that you mentioned earlier in your
- 1:27:22testimony correct no that's a separate
- 1:27:24charge okay and so have you done any
- 1:27:27calculations adding that MRC into the
- 1:27:31state 911 SE charge to determine if the
- 1:27:33bottom chart puts puts it at above three
- 1:27:37cents no I've not done that
- 1:27:40calculation and with respect to the
- 1:27:42revisions exhibit 110 that will be
- 1:27:45forthcoming is the change that you made
- 1:27:47it from 600 concurrent sessions to 623
- 1:27:51concurrent
- 1:27:52sessions no
- 1:27:59um if we look at this um page two of the
- 1:28:06exhibit that is up and using the 24mon
- 1:28:08recovery period the monthly recurring
- 1:28:11charge under tariff 25 goes up um per
- 1:28:14concurrent session by
- 1:28:16$310 186 is that correct correct and
- 1:28:21that would begin to flow in in March of
- 1:28:222025
- 1:28:24correct and so if you multiply $310 186
- 1:28:28by 623 concurrent sessions that's
- 1:28:33193,000 plus um that will be coming in
- 1:28:36to cover the cost of these projects
- 1:28:39correct um I I'll accept the math of
- 1:28:41that
- 1:28:50yes I'm going to go to the um equipment
- 1:28:53of upgrade for Burlington and Lamar um
- 1:28:57that's an inter office diversity project
- 1:29:00as you've
- 1:29:01described excuse me as Mr do described
- 1:29:04in exhibit 100 correct that's correct in
- 1:29:08an in office diversity project goes
- 1:29:10between Century Links Central offices
- 1:29:13correct correct and the first attachment
- 1:29:17to the second amended Improvement plan
- 1:29:19we don't need to pull it up because it's
- 1:29:20confidential but that would be
- 1:29:22attachment uh exhibit 100 attachment
- 1:29:26sd1
- 1:29:28d1c page two is an actual map of those
- 1:29:32inter office facilities in Colorado
- 1:29:35correct correct do you have a copy in
- 1:29:38front of
- 1:29:39you
- 1:29:44uh I don't just second are you gonna be
- 1:29:48asking questions about the confidential
- 1:29:49exhibit I just wanted him to explain the
- 1:29:52legend and I didn't know if
- 1:29:55explaining the legend would need to be
- 1:29:57off the Record if it is I'm not well I
- 1:29:59mean I don't know what your questions
- 1:30:00are going to be I just I just I just I
- 1:30:03just heard that word confidential pop
- 1:30:05out and so um if they're not if you know
- 1:30:09be careful so I
- 1:30:10say I have the map in front of me okay
- 1:30:14for purposes of uh the administrative
- 1:30:19law judges understanding of that
- 1:30:21particular exhibit and the arguments
- 1:30:22that will be made from it
- 1:30:24it are you able to publicly explain what
- 1:30:29the Legends under the facilities by
- 1:30:32owner and type
- 1:30:36mean or do we need to go off the
- 1:30:39Record
- 1:30:41well
- 1:30:43um I'm U familiar with uh the the the
- 1:30:49the the naming here of certain
- 1:30:51facilities are leased certain uh
- 1:30:53facilities are our fiber um but I can't
- 1:30:56speak to the specific sir I'm not
- 1:30:57familiar with the specific examples here
- 1:31:01you're not familiar with the color
- 1:31:03coding excuse me you're not familiar
- 1:31:06with the color coding oh no I'm not or
- 1:31:10the the um descriptions that follow the
- 1:31:13color coding under facilities by owner
- 1:31:15and type what I would say is the the
- 1:31:20where it says lease those are lease
- 1:31:21facilities where it says fiber those are
- 1:31:23fiber
- 1:31:24where it says T carrier those are T1
- 1:31:26systems and so it's the different kinds
- 1:31:29of um uh underlying facilities that we
- 1:31:33use across the state in
- 1:31:40Colorado um can you briefly describe uh
- 1:31:44what is a central
- 1:31:46office central office has a physical
- 1:31:48building that houses telecommunications
- 1:31:50equipment um it's used for different
- 1:31:53purposes um across a range of services
- 1:31:56that telecommunication providers uh
- 1:31:58provide to their
- 1:32:00customers and those are noted in the
- 1:32:03confidential uh
- 1:32:06exhibit exhibit 100 attachment sd1 d1c
- 1:32:10they're noted with um yellow circles
- 1:32:18correct uh correct and there's there's
- 1:32:21approximately 227 Central offices in
- 1:32:25Colorado that's that's my understanding
- 1:32:30yes are Central offices specific for 911
- 1:32:34traffic no they carry all traffic
- 1:32:37correct
- 1:32:41correct so if a central office diversity
- 1:32:44is increased or improved that is for the
- 1:32:47benefit of all traffic including 911
- 1:32:50traffic well it it depends on if the
- 1:32:52traffic uses the Improvement so that's
- 1:32:55uh in the case of the projects that
- 1:32:58we're proposing now the only traffic
- 1:32:59that we're aware of is traffic that's
- 1:33:01dedicated to
- 1:33:05911 I you identify for me the central
- 1:33:08offices in Colorado that are 911
- 1:33:12specific well there are
- 1:33:14none there there are no 911 only Central
- 1:33:17offices
- 1:33:25would you agree with me where everything
- 1:33:27even if you have middle mile diversity
- 1:33:29funnels down to a central office there
- 1:33:32is common equipment shared in that
- 1:33:33central office
- 1:33:37correct um the real common equipment is
- 1:33:40the building
- 1:33:41itself within the building is racks of
- 1:33:44different kinds of telecommunications
- 1:33:46equipment that can be um um used for
- 1:33:49different purposes sometimes the
- 1:33:51equipment is dedicated to a service
- 1:33:53particular service
- 1:33:54sometimes the um equipment is dedicated
- 1:33:57to particular customer uh but the only
- 1:33:59thing that's really common is the
- 1:34:01central office itself okay so are you is
- 1:34:05it your testimony that there's no
- 1:34:07unavoidable common equipment in a
- 1:34:09central
- 1:34:11office I'm not saying there's no common
- 1:34:14equipment I'm saying that the it depends
- 1:34:18on which part of the central office
- 1:34:20you're talking about the definition of
- 1:34:22common so there's
- 1:34:24common for the infrastructure itself the
- 1:34:26building that's shared by everything in
- 1:34:28the building um there's if you go into
- 1:34:31the building and you see racks of
- 1:34:33equipment and look at the equipment
- 1:34:35that's in those racks sometimes that
- 1:34:37equipment is common to a service
- 1:34:40sometimes it's common to a customer in a
- 1:34:43particular situation it all it's all
- 1:34:45situational it varies okay so there can
- 1:34:48be equipment common to the basic
- 1:34:50emergency service that Sentry Link
- 1:34:52provides
- 1:34:54sure there could be okay and with
- 1:34:56respect to that central office that
- 1:34:58building you described if the power goes
- 1:35:01out that's a problem correct correct and
- 1:35:06so um even though you might have middle
- 1:35:08mile diversity to get to that central
- 1:35:10office that central office could be a
- 1:35:12single point of failure because of a
- 1:35:14power failure
- 1:35:16correct um you have to take care of each
- 1:35:20piece and certainly power at the central
- 1:35:23office is one
- 1:35:31correct um landline calls can go through
- 1:35:35a central office correct they do and
- 1:35:38wireless calls can go through a central
- 1:35:41office they they can in the right
- 1:35:44situation so um um if a a wireless
- 1:35:50carrier is interconnecting with our
- 1:35:52Network in Colorado and those calls are
- 1:35:55getting to their end users um on
- 1:35:58facilities in are end office or central
- 1:36:01office it could it all depends the
- 1:36:03particular
- 1:36:06situation with respect to this project
- 1:36:09the Burlington Lamar upgrade that is for
- 1:36:12additional equipment that's needed to
- 1:36:13use Fiber connections that exist between
- 1:36:16Cheyenne Wells and Kit Carson
- 1:36:19correct correct you need two pieces here
- 1:36:24uh in order to turn up a new circuit one
- 1:36:27is you need the fiber itself it's the
- 1:36:29glass that the calls travel across um
- 1:36:33the second piece you need is the
- 1:36:34electronics to actually use the glass it
- 1:36:37lights it up makes the lights flicker
- 1:36:39and so in this case in order to um
- 1:36:43utilize fiber that's already there for
- 1:36:45this diversity we need the incremental
- 1:36:48equipment that lights up that fiber okay
- 1:36:52so the fiber is there and its own by a
- 1:36:53third party correct I'm not aware that
- 1:36:56it's owned by a third party if you look
- 1:36:59at the map in front of
- 1:37:02you and you use the
- 1:37:05legend between Kit Carson and Cheyenne
- 1:37:08Wells does the legend help you answer my
- 1:37:12question uh I I'm I'm not aware of the
- 1:37:15the I wouldn't want to answer that you
- 1:37:18know with certainty I just don't know um
- 1:37:21if there's any Lumin fiber there or or
- 1:37:23if it's least
- 1:37:27fiber if there's Lumen fiber there well
- 1:37:31let me back up there's fiber there
- 1:37:34correct correct and there's fiber that's
- 1:37:36been there for years
- 1:37:39correct um I don't know how long it's
- 1:37:41been there but it's there
- 1:37:43now and um that fiber carries
- 1:37:49traffic uh I I I I assume so
- 1:37:55the only missing piece is this equipment
- 1:37:57or excuse me the electronics that you
- 1:37:59described to light it
- 1:38:00up
- 1:38:02correct
- 1:38:04um and this is just so the fiber strand
- 1:38:07I'm sorry the just to clarify the fiber
- 1:38:09strands that we're looking to
- 1:38:12access would would be dark and would be
- 1:38:15lit up with the equipment that we're
- 1:38:19proposing so they're not being used for
- 1:38:22any inter office diversity purpose
- 1:38:26now not that I'm aware of no why why is
- 1:38:30it on your inter office um map then if
- 1:38:36it's not serving any purpose currently
- 1:38:39um
- 1:38:41well the the fiber route
- 1:38:44itself um would have uh Fiber Optic
- 1:38:49Cables within the route that could be
- 1:38:51used for other purposes what we're
- 1:38:54looking to do is to light up uh strands
- 1:38:57that aren't being used and we need the
- 1:38:59electronics to do
- 1:39:06that looking looking at the legend
- 1:39:08there's a reference to an independent
- 1:39:10switch can you explain what's an
- 1:39:11independent
- 1:39:14switch I'm not familiar with that
- 1:39:17terminology the additional equipment
- 1:39:20that you're proposing uh would uh
- 1:39:23benefit all traffic not just 9911
- 1:39:26traffic
- 1:39:27true the only traffic we're aware of
- 1:39:30right now that'll benefit from that will
- 1:39:31be 911 traffic I don't understand your
- 1:39:34answer is it your testimony that there
- 1:39:36will be no tra no voice calls no traffic
- 1:39:40other than 911
- 1:39:42calls um it's it's my testimony that
- 1:39:46when when we look at the facts at hand
- 1:39:50the facts at hand say that the traffic
- 1:39:53that will use these facilities that are
- 1:39:56being put in place will be 91 one
- 1:39:58traffic um beyond that who might
- 1:40:01theoretically or hypothetically use or
- 1:40:03how we might use it in the future I I
- 1:40:05don't have any information to answer how
- 1:40:08that how that might um how that might
- 1:40:11develop okay if I'm a citizen in
- 1:40:15Cheyenne walls and I place a 911 call uh
- 1:40:20when is it identified as a 911 call
- 1:40:24it's identified as a 911 call by the
- 1:40:26local switch that serves the citizen and
- 1:40:29that's in the central office
- 1:40:32correct so the call has to get to the
- 1:40:35central office to even determine if it's
- 1:40:37a call to Mom or a 911 call it does
- 1:40:41across the local
- 1:40:46Loop does centry link have local
- 1:40:48customers in that area yes
- 1:40:56does centry link have interconnection
- 1:40:58agreements with carriers to transport
- 1:41:00their traffic in that
- 1:41:03area uh I'm
- 1:41:05not we have interconnection with other
- 1:41:08carriers in the state I'm not sure how
- 1:41:10it specifically would apply here in this
- 1:41:13this part part of the
- 1:41:17state
- 1:41:20um are you aware of any times centry
- 1:41:23link has taken the position that a fiber
- 1:41:25cut
- 1:41:27affecting paaps in that area were
- 1:41:31outages in the OSP network not the basic
- 1:41:34emergency service
- 1:41:37network um I'm not I'm not aware of
- 1:41:41specific statements no uh your honor I'd
- 1:41:44ask that you take administrative notice
- 1:41:47of outage investigation
- 1:41:50246 filed in commission preceding
- 1:41:5524m
- 1:41:570020 t as in Tom and that's a outage
- 1:42:03affecting uh prowers
- 1:42:05County um and the pp in that facility
- 1:42:10and Sentry links positions taken in that
- 1:42:18case so what was filed in that case I I
- 1:42:21I I have the case number but what
- 1:42:22exactly was filed by who and by who yep
- 1:42:26so uh the commission staff filed report
- 1:42:30number
- 1:42:3224-6 and um it's an 11 page
- 1:42:36filing and in particular on page seven
- 1:42:40paragraph six Century Link's response
- 1:42:44was this was a fiber cut in the OSP
- 1:42:46Network and was not a failure of the
- 1:42:49bees service all right um there any OB
- 1:42:53to take an administrative notice of that
- 1:42:562406 outage filing by the commission
- 1:42:58staff in proceeding 24m
- 1:43:04z2t uh no you're honor okay um
- 1:43:07administrative notice shall be taken of
- 1:43:12that and in that uh Mr Caron are you
- 1:43:16aware that uh Central Lake took the
- 1:43:19position that in office diversity in
- 1:43:21that OSP Network could have mitigated or
- 1:43:23prevented that outage caused by the
- 1:43:25fiber
- 1:43:27cut I'm I'm not aware of that specific
- 1:43:30statement that was made
- 1:43:33then let's go to the um cost of this so
- 1:43:37centry link got one quote for this piece
- 1:43:39of equipment and it's
- 1:43:42$235,000 roughly
- 1:43:44correct correct and that's all in with
- 1:43:47all of the optional Services listed in
- 1:43:49the quote correct correct and so so with
- 1:43:53all those optional Services listed
- 1:43:55there's really nothing left for Century
- 1:43:57Link to do it's that company is going to
- 1:44:00install it and and migrate the traffic
- 1:44:05correct um well no I wouldn't say that
- 1:44:09um you know to to put a piece of
- 1:44:11equipment into the network like the
- 1:44:13example here um we would Leverage The
- 1:44:17the organization that supplies us with
- 1:44:20the equipment um that they may be the
- 1:44:23group that does the installation it may
- 1:44:24be a a lumen technician that does the
- 1:44:27installation um there'll certainly be
- 1:44:30ongoing maintenance of that equipment
- 1:44:32that would be required over time and so
- 1:44:34I would expect the Lumen technician to
- 1:44:36be engaged in that okay but I'm just
- 1:44:39talking about getting it set up all of
- 1:44:40the optional Services include all in
- 1:44:43that company is going to turn it on for
- 1:44:46you that um you know I'm not specific
- 1:44:49with all the features on this particular
- 1:44:51equipment so I don't know if
- 1:44:53100% of the features available are
- 1:44:55included here or just the features
- 1:44:57required for this particular situation
- 1:45:00we would uh send our um uh quote request
- 1:45:04to the company laying out specifically
- 1:45:06what we needed for this particular
- 1:45:08situation in terms of functionality and
- 1:45:11then what we would get back from the
- 1:45:13supplier would be a quote that supported
- 1:45:15those requirements okay and so um if one
- 1:45:19wanted to look at the detail for that in
- 1:45:21particular
- 1:45:23one would go
- 1:45:26to exhibit
- 1:45:30100 attachment SD
- 1:45:331-5 C page three to look at the
- 1:45:37equipment total the optional fiber
- 1:45:40characterization the optional
- 1:45:43budgetary um e f and I services and the
- 1:45:47traffic migration Services correct
- 1:45:50correct and that's how you get to the
- 1:45:52235,000
- 1:45:53total correct correct if we could put up
- 1:45:56exhibit 101 attachment sd4 at page three
- 1:46:00uh it's sd4 revision two please hey sire
- 1:46:05I'm gonna ask you real quickly I apolog
- 1:46:07I really apologize um but uh before you
- 1:46:11start in on that I want to go off the
- 1:46:12record for one second I just want to
- 1:46:15check with my court reporter because
- 1:46:16it's 105 and I just want I want to make
- 1:46:18sure she's okay and um Tracy you okay
- 1:46:23I I'm good to go to 11 okay all right I
- 1:46:25just wanted to make sure on that okay I
- 1:46:27apologize Miss old I gotta I gotta take
- 1:46:29care of people take care of me back
- 1:46:33water we'll go back on the record hurry
- 1:46:36up with
- 1:46:39that okay thank you for your
- 1:46:48patience okay Mr Carlson I I've put back
- 1:46:50up um the um
- 1:46:53exhibit 101 attachment sd4 page three
- 1:46:57and the Burlington Lamar equipment
- 1:46:59project is the third column so the
- 1:47:02equipment costs are the 235,000 in the
- 1:47:05second row correct correct and then
- 1:47:08there's an overhead charge of 6% that
- 1:47:11totals $14,000 what's the
- 1:47:13overhead so um I I think it's important
- 1:47:17to kind of segregate costs here so as
- 1:47:20you described earlier those those
- 1:47:23um the functionality that the cost um to
- 1:47:26deliver the functionality from the
- 1:47:28supplier U is in the 235,000 it's the
- 1:47:33let's call it the setup cost that um the
- 1:47:36engineering uh cost the things of that
- 1:47:39nature that um um we need to to get the
- 1:47:42equipment up and running but it's not
- 1:47:44the total of costs that we incur uh even
- 1:47:48in the the the installation process or
- 1:47:52the the ongoing going taking care of the
- 1:47:53equipment once it's in place so that's
- 1:47:56why um we use a factor here in this case
- 1:48:00of 6% to account for those um uh for
- 1:48:04those uh additional costs that we would
- 1:48:07expect to incur beyond the the initial
- 1:48:10cost and in other proceedings we've used
- 1:48:138.76% as that overhead that's been
- 1:48:15accepted in the past in the ezet uh
- 1:48:19tariff and the eat's Tariff and so um
- 1:48:23this line item here is um seeking to um
- 1:48:27you know to quantify using a factor what
- 1:48:31those overhead or additional costs might
- 1:48:33be okay and again I'm just going to ask
- 1:48:36real narrow questions because I'm
- 1:48:37limited in time but so is it your
- 1:48:40testimony that overhead is engineering
- 1:48:42costs and then ongoing maintenance and
- 1:48:45things like that o overhead is a range
- 1:48:48of costs it could be shipping costs it
- 1:48:50could be it there there's a range of
- 1:48:53costs that's why it's a factor um it's a
- 1:48:56factor based on experience that um has
- 1:48:59been developed um to uh allocate an
- 1:49:03amount to uh to expected costs going
- 1:49:06forward okay so it's not an actual cost
- 1:49:09based figure where shipping costs $1,000
- 1:49:13and sales tax was 1,500 it's not that
- 1:49:17level of detail it's just like you said
- 1:49:20a 6% estimate a catch it's it's a factor
- 1:49:24based on
- 1:49:27experience and um so you calculate then
- 1:49:30looking back at this exhibit for the um
- 1:49:35B Burlington Lamar equipment project you
- 1:49:37get a subtotal of
- 1:49:40[Music]
- 1:49:41$249,450 correct correct correct and
- 1:49:44you're calculating Century Links profit
- 1:49:47off of that subtotal that includes this
- 1:49:496% overhead Factor correct
- 1:49:53correct and then with respect to Capital
- 1:49:56costs you're adding 15% per year if this
- 1:49:59was over 24 months there would be
- 1:50:0437,000 Plus for two years correct
- 1:50:08correct and so the difference is for
- 1:50:11purchasing a piece of equipment worth
- 1:50:15$235,300 with all optional Services
- 1:50:19provided by that vendor Century Link
- 1:50:21gets another
- 1:50:245,138 52
- 1:50:29correct um I'm not sure I understand
- 1:50:32your question could you ask it again the
- 1:50:34difference between the equipment cost of
- 1:50:36235,000
- 1:50:38plus and the total cost line the 350 is
- 1:50:43roughly 115,000
- 1:50:46correct that's the difference between
- 1:50:48the two correct and centry Link's going
- 1:50:50to own that equipment outright
- 1:50:53correct and there are no restrictions on
- 1:50:55its use no oversight of whether it's
- 1:50:58specific to 911 or used for all call
- 1:51:01Traffic
- 1:51:03true
- 1:51:05um what we've identified for use of this
- 1:51:08equipment is 911 traffic exclusively
- 1:51:10that that's what we've identified here
- 1:51:12so um it was engineered to do that I'm
- 1:51:15not aware of any extra capacity in this
- 1:51:18equipment to be used for other services
- 1:51:21um it's the equipment that has been
- 1:51:22identified to to uh enable the fiber
- 1:51:26connectivity for 911
- 1:51:28services and so um again my question is
- 1:51:32there's no restrictions on its use
- 1:51:34though in your proposal
- 1:51:37correct um no restrictions but it's
- 1:51:41purposed for just one thing and that's
- 1:51:44911 and so for purposes of this piece of
- 1:51:47equipment if
- 1:51:49the uh MRC is the 3 $10 that we talked
- 1:51:53about earlier times 623 concurrent
- 1:51:57sessions if the first month and month
- 1:52:00and a half are allocated specifically
- 1:52:02this to this project if it's approved
- 1:52:05that would cover the full cost of this
- 1:52:07piece of equipment
- 1:52:12correct
- 1:52:13um I'd have to see the math I'm not I'm
- 1:52:16not tracking with your math
- 1:52:19here um is there any way that by paying
- 1:52:22in full the cost of that piece of
- 1:52:24equipment these uh roughly
- 1:52:28$74,000 in capital costs could be
- 1:52:33avoided well
- 1:52:37um
- 1:52:40so the I guess I'll answer it this way
- 1:52:43so the the capital cost shown here for
- 1:52:46year one year two are um anticipating
- 1:52:51that um um per our request we would
- 1:52:54begin investing in this in
- 1:52:572024 and so since the recovery wouldn't
- 1:53:00start until March um and then it would
- 1:53:04come in a month at a time we would um
- 1:53:07expend the capital um upfront in
- 1:53:11everything that we need and then the
- 1:53:13recovery would come in O over time and
- 1:53:16so since we're
- 1:53:20leveraging uh uh lumen Capital uh to
- 1:53:24enable that there would be Capital costs
- 1:53:26that we have to account for so uh there
- 1:53:29was nothing in our um uh calculations
- 1:53:32that
- 1:53:33anticipate um the the the monies being
- 1:53:38received in 2024 in fact I don't know
- 1:53:41that how that could even happen if the
- 1:53:42rates wouldn't be approved until March
- 1:53:44of
- 1:53:442025 that was my question sir I directed
- 1:53:47it to March of 2025 when that additional
- 1:53:50search charge increase started the
- 1:53:53capital cost could be avoided if the
- 1:53:56cost of
- 1:53:57equipment it was allocated specifically
- 1:54:00to that project right
- 1:54:02away versus spread over all approved
- 1:54:09projects um I I I suppose that's
- 1:54:12theoretically correct but I don't I
- 1:54:14don't um I I don't see how that plays
- 1:54:17out given the timing how funding Works
- 1:54:19in Colorado so um our recommendation has
- 1:54:22to has to reflect the most probable
- 1:54:26situation which is we're spending our
- 1:54:28capital and and we have to account for
- 1:54:30the cost of that Capital um you know and
- 1:54:33then taxes and depreciation other items
- 1:54:37that um would be additional
- 1:54:41costs um will you clarify for the alj
- 1:54:45when you say Capital costs exactly what
- 1:54:48are you referring to You' mentioned the
- 1:54:49time value of money that you fronted the
- 1:54:52cost and need to recoup it over time
- 1:54:54depending on how you take the dollars
- 1:54:56and allocate them over all the approved
- 1:54:58projects what
- 1:55:00else what we reflected in the
- 1:55:0315% um is uh the carrying cost of the
- 1:55:08capital uh and that's a you know a
- 1:55:10calculation that um you know our finance
- 1:55:13organization does and then provides out
- 1:55:16to the um engineering term to or team to
- 1:55:20use our um business case developers um
- 1:55:23it also includes um uh a recognition
- 1:55:28that um uh there will be uh uh taxes
- 1:55:32that will be owed on the on um the the
- 1:55:36services provided um and also the a
- 1:55:39recognition again our assumption here is
- 1:55:42the recovery comes in over time when we
- 1:55:46when we um U make an investment a
- 1:55:49capital investment like we would be
- 1:55:50doing here um um you know per tax
- 1:55:54purposes we depreciate that over long
- 1:55:56periods of time whatever the IRS allows
- 1:55:59for a particular class of asset and so
- 1:56:03um uh that means um you're getting the
- 1:56:07revenue over two years um but the the
- 1:56:11depreciation is being spread over
- 1:56:12multiple years so it creates a a tax
- 1:56:15burden that we have to account for in
- 1:56:17these Capital costs so that's the
- 1:56:19depreciation piece okay and so what
- 1:56:21portion of that 15% are carrying costs
- 1:56:24and what portion is this um recognition
- 1:56:27of taxes on Services provided that you
- 1:56:30just describe I I don't have that split
- 1:56:32out by by subp Parts I just have the
- 1:56:35overall 15% okay and so you're saying
- 1:56:38you get to own a piece of equipment
- 1:56:41without incurring an actual expense
- 1:56:44because you're
- 1:56:46reimbursed
- 1:56:49right um well we do we do incur an
- 1:56:53expense you know we'll pay the the
- 1:56:56companies who will put in the fiber and
- 1:56:58and uh who will implement the equipment
- 1:57:01so we will incur that Capital just like
- 1:57:04any project will do any project across
- 1:57:06the company that has a capital portion
- 1:57:09will incur that and then we'll balance
- 1:57:12against that the revenue that comes in
- 1:57:14in this case through um the Tariff
- 1:57:17charges okay so you're calling it
- 1:57:20Revenue versus reimbursement so that's
- 1:57:22pay taxes on income taxes we pay taxes
- 1:57:26on it yes you're going to pay income tax
- 1:57:29on the uh
- 1:57:33reimbursement for we receive a re we'll
- 1:57:35receive a revenue stream into the
- 1:57:38corporation uh for this work um it'll
- 1:57:41show up on our income statement as a
- 1:57:44revenue stream um uh we will uh um um we
- 1:57:51will pay for the equipment it'll show up
- 1:57:53as a capital cost on our balance sheet
- 1:57:56and uh we'll offset the revenue with the
- 1:57:59expenses associated with it one of them
- 1:58:02is depreciation and so because of the
- 1:58:05timing nature of of um uh the how the
- 1:58:10Tariff charges flow back to us um it it
- 1:58:13creates a position where um uh we need
- 1:58:17to account for those depreciation costs
- 1:58:19in this Factor
- 1:58:22is there any way to account for this
- 1:58:24Revenue stream through the Improvement
- 1:58:26plan process as a grant that is received
- 1:58:29over a 24mth period thus you don't pay
- 1:58:33income on it uh I'm not aware of that I
- 1:58:36I'm not familiar with that
- 1:58:43process um I want to turn to the to the
- 1:58:45next major project um in this and we can
- 1:58:48leave this um exhibit up it would be the
- 1:58:53fourth column the ethernet upgrade uh
- 1:58:57project and there's a footnote one uh on
- 1:59:01hearing exhibit 101 attachment sd4 page
- 1:59:04three revision two that we have up um
- 1:59:09and you indicate that only the total
- 1:59:11costs are listed here is that the
- 1:59:141.76 million total cost so the the 1.76
- 1:59:20million cost shown here on this chart is
- 1:59:22for the non-recurring charges associated
- 1:59:25with the ethernet upgrade it's not the
- 1:59:28MRC it's just the non-recurring
- 1:59:31charges correct
- 1:59:34um you're familiar with the FCC audit
- 1:59:38for 2023 that's been filed as part of
- 1:59:40this application correct oh am and there
- 1:59:43are three sections to that annual report
- 1:59:46one addresses Network backup power
- 1:59:48correct correct one addresses network
- 1:59:51monitoring
- 1:59:52correct and one address the circuit
- 1:59:54diversity by
- 1:59:56peap yes and I want to focus on that um
- 2:00:02page in a minute but would you agree
- 2:00:04with me that the FCC report does not
- 2:00:06reflect all single points of failure in
- 2:00:09the bees
- 2:00:11Network that's correct it it gives you a
- 2:00:14starting point and um um um but it's not
- 2:00:20it's not comprehensive right the FCC
- 2:00:23only requires that audit to relate to
- 2:00:26critical 911 circuits that are defined
- 2:00:29in in the regulations correct correct
- 2:00:32correct and and just for purposes of of
- 2:00:35uh administrative notice we' asked uh
- 2:00:38judge Garvey to take administrative
- 2:00:39notice of 47
- 2:00:42CFR section
- 2:00:4519.9
- 2:00:48A5 which is the definition of critical
- 2:00:51911
- 2:00:53circuits
- 2:00:55um give that to me one more time I I I
- 2:00:58couldn't find my pen quick enough when
- 2:01:00you started talking so I got 47 CFR and
- 2:01:03let me make sure I get it all section
- 2:01:069.19 A five 47 CFR 1
- 2:01:129.91
- 2:01:14A5 um 47 CFR
- 2:01:199.19 A5
- 2:01:23okay 47
- 2:01:259.19
- 2:01:27A5 uh any objection to administrative
- 2:01:29notice of that CFR no you're honor okay
- 2:01:32administrative notion sh not excuse me
- 2:01:34administrative notice shall be taken
- 2:01:37that with respect to um this ethernet
- 2:01:42upgrade a key piece to it is removing
- 2:01:44Sonet technology
- 2:01:47correct um it it's um maybe not so much
- 2:01:52removing the technology but not using it
- 2:01:54anymore so getting off the Sonet
- 2:01:56technology and on to
- 2:02:01ethernet and um the Sonet technology
- 2:02:04shares a common central office in Denver
- 2:02:07correct that's correct and so that
- 2:02:10creates a Statewide risk of a Denver
- 2:02:13based failure if that one central office
- 2:02:16where all Sonet technology goes uh goes
- 2:02:20down correct that's correct that's
- 2:02:22correct and that would affect 47 PS in
- 2:02:25Colorado true correct where's the list
- 2:02:28of the 47 PS that would be affected do
- 2:02:31you have one um well it's it's on the
- 2:02:35list um that has all the costing of it
- 2:02:38but I'm not sure it's specifically
- 2:02:39called out to which ones go through
- 2:02:41Denver main or not I I don't have that
- 2:02:43list okay and the common central office
- 2:02:46in Denver is Denver made correct why is
- 2:02:49Sonet Tech designed that way
- 2:02:53so uh you know telecommunications
- 2:02:56technology has evolved over time and uh
- 2:02:59there was a time when uh everything was
- 2:03:02copper and things moved at Copper speed
- 2:03:05one of the technologies that was
- 2:03:07deployed a long time ago was uh this uh
- 2:03:11Sonic technology and it came into uh
- 2:03:16favor because one it was a fiber optic
- 2:03:19it would have um and it would give you
- 2:03:22faster uh bandwidth speeds uh but it
- 2:03:25could be deployed in a a dual ring
- 2:03:28architecture where basically traffic
- 2:03:30could go across two rings um and uh you
- 2:03:34would have uh more resiliency to it
- 2:03:37Sonet is is more of a point-to-point
- 2:03:40architecture where is ethernet is
- 2:03:42multi-point so there's more flexibility
- 2:03:44there ethernet is a future technology so
- 2:03:49um finding uh equipment for Sonet
- 2:03:53technology uh becomes more difficult
- 2:03:56over time and so the it had its purpose
- 2:03:59at the time just like frame relay had
- 2:04:02its purpose over time just like ATM had
- 2:04:04its purpose at at historically but the
- 2:04:07future is IP and writing over ethernet
- 2:04:10uh
- 2:04:11networks okay
- 2:04:13so
- 2:04:15and the
- 2:04:17commonality of the Sonet technology
- 2:04:20going through Denver
- 2:04:24be removed by
- 2:04:28reconfiguration no no it is not on the
- 2:04:32not on the Sonet system you would still
- 2:04:35have the same limitations of the Sonet
- 2:04:37system if if your question is can you
- 2:04:40use Sonet in a different way to get the
- 2:04:43resiliency um I'm I'm not an engineer so
- 2:04:47I'm kind of on the edge of my knowledge
- 2:04:48here but uh you really have to get to
- 2:04:51ethernet
- 2:04:52Sonet has has upper boundaries on how
- 2:04:55much bandwidth you can have 50 meg I
- 2:04:58believe it is um the upper boundaries on
- 2:05:01ethernet is a gate and so or or more you
- 2:05:04could even more than that so I don't
- 2:05:06think you would ever um work to uh work
- 2:05:11with the Sonet that's already in
- 2:05:14place for purposes of the E correct well
- 2:05:18I think for purposes generally but
- 2:05:20certainly for the purposes of the 47
- 2:05:23sites that we're talking about peace
- 2:05:24applications that we're talking about
- 2:05:27here and so Sonet is is also known as
- 2:05:31synchronous Optical Network correct
- 2:05:33correct correct and the FCC in its um
- 2:05:38proceeding uh to expedite the
- 2:05:41implementation of Next Generation 911
- 2:05:44it's really encouraging getting rid of
- 2:05:47TDM technology correct correct and Son
- 2:05:51it is TDM
- 2:05:53technology uh correct and TDM stands for
- 2:05:57time division
- 2:05:58multiplexing very good that's correct
- 2:06:01and so it's basically Legacy stuff it's
- 2:06:04Legacy it's Legacy technology that's
- 2:06:06correct is it Legacy technology that's
- 2:06:09specific to
- 2:06:10911 no when this sonit network and
- 2:06:16technology is removed and replaced with
- 2:06:19ethernet is that going to affect only
- 2:06:21911
- 2:06:23traffic um my understanding is uh there
- 2:06:27are multiple Sonet
- 2:06:30systems that um are used in the Denver
- 2:06:34area and what we're talking about here
- 2:06:36is taking the 911 traffic off one of
- 2:06:40those systems so the the Sonet will
- 2:06:43continue to exist but 911 use of Sonet
- 2:06:48will stop because it'll use the ethernet
- 2:06:51technology
- 2:06:53instead so I guess I want to make sure
- 2:06:56that we're talking the same same thing
- 2:06:59okay this project will not affect non
- 2:07:04911 call
- 2:07:07Traffic um I'm I'm not that I'm not
- 2:07:10aware that it will I I my my my
- 2:07:15understanding is what the impact is to
- 2:07:17911 and not what the impact might be to
- 2:07:19other services
- 2:07:22can you say one way or another whether
- 2:07:23they'll be impact to other services I
- 2:07:26can't I don't know I don't
- 2:07:29know I I guess I W to ask us uh again
- 2:07:34I'm a lay person no definitely not a
- 2:07:38subject matter expert but at some point
- 2:07:40in the call Flow
- 2:07:42process if a carrier's call is
- 2:07:47um presented to the Ingress point of the
- 2:07:51basic emergency service network in
- 2:07:53analog form right it needs to be
- 2:07:57converted to IP form correct it does in
- 2:08:01Colorado's basic emergency service
- 2:08:03network what does that
- 2:08:06conversion so um there is a
- 2:08:11device um that um and this is back to
- 2:08:15one of your earlier questions you asked
- 2:08:17about a point of presence or a pop so um
- 2:08:20there are Lo
- 2:08:22within Colorado that have been
- 2:08:24designated as uh aggregation points for
- 2:08:29that local traffic that non-bp traffic
- 2:08:31to come in and um the network switches
- 2:08:35it to these points of presence uh and
- 2:08:38these gate Gateway devices that are in
- 2:08:41those points of presence convert that to
- 2:08:43IP and then it goes into the bsp
- 2:08:47network okay so that conversion process
- 2:08:51occurs at one of these points of
- 2:08:53presence within Colorado correct correct
- 2:08:56and are there three pairs of those
- 2:09:00points of presence Denver or excuse me
- 2:09:03capill
- 2:09:05Broomfield um that okay so um I know
- 2:09:09there's more than one I don't know
- 2:09:11exactly how many there are so uh I I I I
- 2:09:15wish I had that piece of information I
- 2:09:16just don't know but the way we design
- 2:09:19these networks across the country is to
- 2:09:22have multiple Pops to aggregate OSP
- 2:09:25traffic because this is OSP traffic
- 2:09:28aggregate OSP traffic so it be handed
- 2:09:30off to the
- 2:09:32911
- 2:09:37okay so it's OSP traffic not yet
- 2:09:40identified 911 non 91 it it's been
- 2:09:44definitely identified as 911 when when
- 2:09:47somebody comes off hook on their in
- 2:09:49their home or in the building uh the
- 2:09:52switch that serves that local Loop seeds
- 2:09:55the digit dial of 911 and says wow this
- 2:09:58is a 911 call I'm going to switch it
- 2:10:01over to the network infrastructure that
- 2:10:03gets you to the pop so you can get to
- 2:10:05the 911 Network that's how the
- 2:10:08origination of a 911 call happens on a
- 2:10:12on a landline Network okay um for
- 2:10:16purposes of asking questions so that
- 2:10:19this is a little bit more clear I do
- 2:10:20want to offer is exhibit 601 which is in
- 2:10:24our folder um the contingency plan filed
- 2:10:28on June 3rd in proceeding 23m
- 2:10:34o23 236 T and I want to offer it as an
- 2:10:39exhibit just so I can pull it up and ask
- 2:10:40this witness questions about it versus
- 2:10:43take administrative notice of it um and
- 2:10:46it's a 29 page filing um
- 2:10:52and I marked it as exhibit
- 2:10:58601 we would offer exhibit uh 601
- 2:11:01specifically Pages 24 through
- 2:11:0628 um and your honor this is the exhibit
- 2:11:09I I guess I should allow centry link a
- 2:11:11chance to speak to it this is the
- 2:11:13exhibit I mentioned that contains the
- 2:11:15October 2023 FCC audit report in a
- 2:11:19public filing so it's so it's the same
- 2:11:22as um hearing exhibit 100 attachment sd1
- 2:11:28d8c which was filed
- 2:11:30confidentially I any objection to
- 2:11:35601 if you Ed to Live Foundation and ask
- 2:11:37him whether he knows if this if this
- 2:11:39stuff like that you can or not it's up
- 2:11:41to
- 2:11:42you I Jud I guess my issue is like we
- 2:11:46don't have access to reviewing this
- 2:11:47document other than just looking at the
- 2:11:49screen right now I don't there's nothing
- 2:11:50on we don't we don't we don't have
- 2:11:53access to 601 do we otherwise I'll send
- 2:11:56it to you right now Council um I was
- 2:11:59trying to multitask but give me two
- 2:12:01seconds and I will send the document to
- 2:12:03you all
- 2:12:05Council Miss feder Rico can you kind of
- 2:12:07like page through this document I just
- 2:12:10look on the screen and see if that looks
- 2:12:12okay
- 2:12:37I did hit send your honor so with if we
- 2:12:39could have like a 30 second pause for
- 2:12:41for Council to be able to review that
- 2:12:44well if you can look on the screen here
- 2:12:46and figure out from that that's fine but
- 2:12:49I'll leave it to him if he wants to look
- 2:12:50at it first or not yeah and is this
- 2:12:53document being offered confidentially or
- 2:12:57non-confidential non-confidential SP I
- 2:12:59know yeah it it is a public F so it's
- 2:13:06non-confidential just uh if I can just
- 2:13:09consult with my client rep here I won't
- 2:13:11talk to the witness just want to talk to
- 2:13:13Mr conman for a second about
- 2:13:17this uh I'd also just note for parties
- 2:13:21um this being live stream so if it is
- 2:13:24confidential and you need me to take it
- 2:13:25down you'll have to tell me as soon as
- 2:13:26you figure it
- 2:13:29out it was publicly filed I'm thinking
- 2:13:32is that correct miss omire it was okay
- 2:13:35so okay I was just letting them know in
- 2:13:39case they didn't know that we'd have to
- 2:13:40turn it off yeah no no no yeah no I
- 2:13:43appreciate
- 2:13:44it thanks for everyone's assistance and
- 2:13:46patience on that and no we don't we have
- 2:13:48no objection okay 601 shall be admitted
- 2:13:51and mire I will give you a heads up
- 2:13:53warning we are 17 minutes away from the
- 2:13:55top of the hour when we'll be taking our
- 2:13:57break so uh plan your questions
- 2:14:00accordingly thank you H um if we could
- 2:14:03go to the preceding page page 28 of this
- 2:14:06exhibit
- 2:14:09601 can you tell me what these are the
- 2:14:12911 service areas are those the points
- 2:14:15of presence you were
- 2:14:19dising um uh I'm um I I'm not
- 2:14:24understanding them to be the points of
- 2:14:25presence but to be the the geographic
- 2:14:28area um well I honestly I'm not sure the
- 2:14:32I'm not sure the use of this particular
- 2:14:34word 911 service area here I assume I'm
- 2:14:37assuming the geographic areas I
- 2:14:40recognize the names of the places so
- 2:14:42Geographic areas within u in the state
- 2:14:45have been giving a designation of a of a
- 2:14:47service area okay you know what network
- 2:14:50monitoring occurs in those particular
- 2:14:52Geographic
- 2:14:53areas uh I I would anticipate the the
- 2:14:56network monitoring that we do you know
- 2:14:59across the board okay and do you know
- 2:15:02where in the explanation of alternative
- 2:15:04measure for network monitoring uh what
- 2:15:07is meant by Sonet hyphen groom in the
- 2:15:13middle uh I I would assume that is as I
- 2:15:16mentioned before grooming process is
- 2:15:18looking at the network and saying it is
- 2:15:21there movement that we want to do within
- 2:15:22the network of circuits across different
- 2:15:25systems that this is a grooming U uh
- 2:15:28measure taken on a Sonet
- 2:15:32system okay but we're getting rid of the
- 2:15:34Sonet system correct in you're under
- 2:15:37your
- 2:15:38project uh for the 47 yeah for the 47 P
- 2:15:41apps that we talked about um we would
- 2:15:44take those um those connections off the
- 2:15:48um um off the son system and put on
- 2:15:53ethernet and then let's just review this
- 2:15:56document while we have it up could we
- 2:15:57please go to page uh
- 2:16:0227 um and we'll have to to blow this up
- 2:16:06a little bit
- 2:16:08more is this the circuit diversity page
- 2:16:12so I I mean because of the size of it I
- 2:16:15mean I can blow it up but you're going
- 2:16:17going to have to tell me which you know
- 2:16:18piece you want me to focus on because
- 2:16:20otherwise you won't won't see the whole
- 2:16:21screen certainly um let's just focus on
- 2:16:24the the very beginning the upper left
- 2:16:26quadrant
- 2:16:29please thank you that's uh more vable so
- 2:16:37um oh I apologize this is this is the
- 2:16:40one that relates to um Network backup
- 2:16:43power
- 2:16:49correct Mr Carson oh um I I'm assuming
- 2:16:55this is the output of the FCC audit
- 2:16:58correct correct there's a title on it if
- 2:17:00we scroll up a little bit yeah I didn't
- 2:17:03see that so
- 2:17:05um yeah I it has you're you're right
- 2:17:09this is a section that talks about
- 2:17:11battery backup okay if we could please
- 2:17:13go to page 24 of this
- 2:17:15exhibit uh 106 or excuse me
- 2:17:19601 um if you see the header there it's
- 2:17:21the 2024 contingency plan October
- 2:17:252023 uh FCC audit results do you see
- 2:17:29that I see that okay and so then under
- 2:17:32the columns we've got pep name the
- 2:17:36county and uh reasons not fully
- 2:17:39Diversified there correct right so
- 2:17:42within this chart you're saying we
- 2:17:44should be able to identify the 47 P apps
- 2:17:46that will be um have this common point
- 2:17:50of failure at Denver main removed
- 2:17:52correct no what I I wasn't referencing
- 2:17:56the the FCC audit I was referencing the
- 2:17:59the the table that was provided that had
- 2:18:02all of the P apps uh that were going to
- 2:18:05be impacted by the ethernet upgrade um
- 2:18:08the and I think 81 or 82 I don't know
- 2:18:12the EXA I don't recall the exact amount
- 2:18:14within that count are the 47 but I don't
- 2:18:17know that it's noted specifically which
- 2:18:21ones are the ones that are out of uh
- 2:18:24Denver mate I just don't have that
- 2:18:26information okay so we can't tell from
- 2:18:29this
- 2:18:30document not that I'm aware of okay but
- 2:18:33in
- 2:18:37the the
- 2:18:39um ninth column describe alternative
- 2:18:44measures uh taken uh do you see that
- 2:18:47column I see that and the Adams County
- 2:18:50Communication Center Sonet build and
- 2:18:52groom CG circuits are logically
- 2:18:57diverse
- 2:18:59um groom reroute additional circuits did
- 2:19:02you see that entry yeah I see that okay
- 2:19:06with respect to this FCC audit and that
- 2:19:09lack of diversity that's been in
- 2:19:11existence um since the beginning of
- 2:19:14these FCC audits in 2016 roughly
- 2:19:18correct um
- 2:19:21uh well I I haven't seen all the audits
- 2:19:23so I can't say for sure but I I would
- 2:19:25imagine that this the the system that's
- 2:19:28reference here for this p app um has
- 2:19:30been in place for a
- 2:19:32while and using Sonet if it has Sonet it
- 2:19:35means it's old right yeah I would
- 2:19:37imagine so I think that's a I think
- 2:19:40that's accurate okay with the Sona
- 2:19:43upgrade are you going to be able to get
- 2:19:44rid of Legacy Network
- 2:19:46gateways
- 2:19:48no and again where are those Legacy
- 2:19:50Network Gateway is
- 2:19:52located um a legacy Network Gateway is
- 2:19:56um uh located at the pop it's the it's
- 2:20:00the uh uh architecture that um converts
- 2:20:05uh TDM traffic to IP to go into the the
- 2:20:08bsp
- 2:20:09network you said the LGs are located at
- 2:20:12the pop that's my understanding that's
- 2:20:14where they're located I I that's my
- 2:20:17understanding yes
- 2:20:21um the application describes a common
- 2:20:24point of failure at Denver Maine and I
- 2:20:26want to ask you specifically has there
- 2:20:28been such a denver-based
- 2:20:31failure in Colorado not that I'm aware
- 2:20:33of no
- 2:20:54so it's accurate to say that there is if
- 2:20:56there is no Sonet calls don't have to go
- 2:20:58through Denver
- 2:21:02Maine I'm not sure what you mean by a
- 2:21:04Sonic
- 2:21:05call Sonet technology if there's no
- 2:21:08Sonet technology involved in the
- 2:21:11transport of that call then they the
- 2:21:14call won't have to go through Denver
- 2:21:16main um what I would well what I would
- 2:21:20say is taking
- 2:21:22it getting off the Sonet system for
- 2:21:25those 47 piece apps and going to
- 2:21:27ethernet puts the 911 traffic on a
- 2:21:30completely different architecture with
- 2:21:33the benefits that come the mesh type
- 2:21:35architecture that comes from um uh from
- 2:21:38ethernet so you have different routing
- 2:21:41options in that meshed environment that
- 2:21:43you don't have in a Sonet which is a
- 2:21:46point-to-point type of
- 2:21:48architecture now yeah
- 2:21:51yeah so the answer is ethernet means all
- 2:21:55calls won't have to go through Denver
- 2:21:56main for those 47 P apps e ethernet
- 2:21:59means the calls will take a different
- 2:22:01routing path than they did before um
- 2:22:05call Flow diagrams for those 47 pups
- 2:22:08engineering call Flow diagrams to show
- 2:22:11the
- 2:22:12impact uh I'm those documents haven't
- 2:22:15been prepared
- 2:22:23how much
- 2:22:24um well let's strike that
- 2:22:47um do you have selective router in the
- 2:22:53EET so um
- 2:22:57um the the phrase selective router
- 2:23:00generally speaking is a a phrase used to
- 2:23:03describe the 911 switching that um has
- 2:23:07happened in the past when we uh deployed
- 2:23:10the EET in Colorado we went from a
- 2:23:14selective rou or to a nexton course
- 2:23:17Services platform that does the routing
- 2:23:21function so the EET is actually the
- 2:23:24network connectivity that connects the
- 2:23:27next gen core Services routing
- 2:23:28architecture to the paaps so um if you
- 2:23:33mean are we doing selective routing like
- 2:23:36was done before the EET no we don't do
- 2:23:39that anymore because now we use an next
- 2:23:41in core Services architecture that does
- 2:23:44that routing
- 2:23:45function and so there's a is there a
- 2:23:47functional equivalent to a selective
- 2:23:49router
- 2:23:51um at at a very high level there's a
- 2:23:54functional equipment but the
- 2:23:55capabilities of next gen cor services
- 2:23:58are 10x more robust than a legacy
- 2:24:01selected
- 2:24:04rou um with respect to the next
- 2:24:06generation core Services capability that
- 2:24:09you
- 2:24:11described is where is that process
- 2:24:14taking
- 2:24:16place so we work with um a company
- 2:24:19called intrado
- 2:24:21and we one of our suppliers and we use
- 2:24:24their uh next and cor Services
- 2:24:26applications that are housing their data
- 2:24:29centers and where are their data
- 2:24:31centers um one's in Longmont I think the
- 2:24:35other one is in Miami but I don't I'm
- 2:24:37not 100% sure on that okay do the
- 2:24:41phrases um Anglewood in
- 2:24:45Miami could be yeah that sounds right
- 2:24:48but I don't know for sure
- 2:24:53um in the application it says ethernet
- 2:24:57can reduce Transportation costs how
- 2:25:03so um so I think you have to look at
- 2:25:05this um use of Technology over time so
- 2:25:11um when you look at what we have in
- 2:25:13place now the the network connectivity
- 2:25:16that connects to the P apps we're using
- 2:25:19TDM technology I'm division multiplexing
- 2:25:23T1 technology that is end of life in
- 2:25:26many situations it's getting more
- 2:25:28expensive so to continue on with a TDM
- 2:25:32technology means uh costs are going to
- 2:25:34go up over time um the future for this
- 2:25:38kind of Architecture is ethernet um
- 2:25:41ethernet is um um over time is going to
- 2:25:45be a less costly solution because it's
- 2:25:47more broadly used um TDM
- 2:25:51technology is being phased out across
- 2:25:52the country um and which means there's
- 2:25:55going to be less and less use of it so
- 2:25:57the cost of it's going to be higher and
- 2:25:59higher for the equipment if if new
- 2:26:01equipment is needed so um um uh if you
- 2:26:05look at ethernet going forward over a
- 2:26:07range of time it's going to be a cheaper
- 2:26:09technology for the state okay and again
- 2:26:13that TDM technology is not 911 specific
- 2:26:16it's it's
- 2:26:17all um correct that technology is used
- 2:26:22everywhere um the application specific
- 2:26:25to paaps in Colorado though is TDM at
- 2:26:27this
- 2:26:29point
- 2:26:30um and you have not accounted for any
- 2:26:33reduction in transportation costs in the
- 2:26:37costs being proposed for this project
- 2:26:41correct so
- 2:26:44um it's probably transport costs is
- 2:26:46probably the right phrase um but um
- 2:26:50there's um um we're not we're not
- 2:26:54anticipating the like in in right now
- 2:26:57we're not anticipating the cost for our
- 2:26:59ethernet proposal to go down partially
- 2:27:03because part of our project is to uh is
- 2:27:06to engage with thirdparty providers GTE
- 2:27:10Comcast as examples to provide a diverse
- 2:27:14circuit to the psap so we increase the
- 2:27:17resiliency that comes at a uh at
- 2:27:20increased cost and um there are some
- 2:27:23Network C there are some equipment costs
- 2:27:25that are required to uh take the
- 2:27:29circuits that we have in place today to
- 2:27:31the PS from TDM to ethernet so there are
- 2:27:34some some costs there so um we've not
- 2:27:38modeled it to go down we've modeled it
- 2:27:40to go marginally up but not not not a
- 2:27:44whole lot and I understand that we'll
- 2:27:47actually look at the specific details of
- 2:27:49the costing but what I'm saying is
- 2:27:50you're not reducing the current cost
- 2:27:54charged under the Tariff for getting rid
- 2:27:57of Sonet and that reduction in
- 2:27:58transportation costs you're not
- 2:28:00accounting for it
- 2:28:02true because we're not reducing any
- 2:28:05costs but you're getting rid of Sonet
- 2:28:07which reduces Transportation costs well
- 2:28:10we're not going to use we're not going
- 2:28:12to use Sonet for for 911 which means the
- 2:28:16the cost associated with 911 uh will
- 2:28:19change
- 2:28:20because Legacy is Saed the future is
- 2:28:23going to be uh ethernet so it it but
- 2:28:27there's no there's no reduction in costs
- 2:28:29immediately for that we're just going on
- 2:28:32to a different network uh technology
- 2:28:34okay and that different network
- 2:28:36technology that ethernet in your
- 2:28:39application exhibit 100 attachment SD 1C
- 2:28:44at page 14 revision one and we don't
- 2:28:47need to pull it up unless you want to
- 2:28:49look at the statement but it's says
- 2:28:51provide the the ethernet provide will be
- 2:28:54providing an increased capacity creating
- 2:28:56an overall benefit to the EET and the
- 2:28:58growth opportunities for new services
- 2:29:01and features correct correct so there's
- 2:29:04an incentive to do this so that more
- 2:29:08services and features can be offered
- 2:29:11correct um that that's a great question
- 2:29:15um and it really gets to the heart of
- 2:29:17what next Generation 911 is all about
- 2:29:20out you know this this IND the industry
- 2:29:23transformation that's going on that I
- 2:29:25know staff is very tuned into um that
- 2:29:29this journey into the future is to have
- 2:29:32Broadband networks in place so more data
- 2:29:35can be sent to First Responders and uh
- 2:29:39the the TDM architecture that we have
- 2:29:41today just simply won't enable that so
- 2:29:45while our proposal is targeted towards
- 2:29:47improving Network resiliency in it also
- 2:29:50has the consequence of increasing the
- 2:29:52capacity of the network going to the pep
- 2:29:55so as new data is made available to 911
- 2:30:00it can ride across that Network
- 2:30:02infrastructure so um and these are all
- 2:30:04services that are are are dedicated 100%
- 2:30:08to
- 2:30:10911 um in your answer you mentioned
- 2:30:13staff is very tuned into that when you
- 2:30:15say staff are you talking about
- 2:30:16commission
- 2:30:17staff um I I guess when I say staff I
- 2:30:20reference um you know Jennifer in
- 2:30:23particular um you know I I have a chance
- 2:30:25to work with folks who are 911
- 2:30:27leadership roles across the country and
- 2:30:29it's these individuals who are tasked
- 2:30:32with taking their communities into the
- 2:30:34future and that's what NextGen 911 does
- 2:30:37it looks at Network architecture and
- 2:30:39says we we want it to be resilient we
- 2:30:42want it to be uh um as as powerful as
- 2:30:45possible but at the same time we want to
- 2:30:48build a future where First Responders
- 2:30:50get the information that they need and
- 2:30:52that gets enabled through Broadband
- 2:30:55networks what we are recommending in
- 2:30:57this ethernet project is to is to put in
- 2:31:01place without a lot of extra cost a a uh
- 2:31:07a Broadband Network for 911 to use and
- 2:31:10so in your answer you you said Jennifer
- 2:31:12are you referring to uh commission staff
- 2:31:14Jennifer Kirland yes I am I'm sorry I
- 2:31:16should have been more specific yeah all
- 2:31:19righty time out so my we we have hit the
- 2:31:2311 o'clock Mark and so in order for me
- 2:31:26to uh not have my staff throw things at
- 2:31:28me later today uh we're going to take
- 2:31:31our lunch break now Mr Carlson I know
- 2:31:33you've got to be incredibly happy will
- 2:31:34be taking a lunch break now I do think
- 2:31:36Mr Doos owes you a lunch or at least a
- 2:31:39we've uh we've already covered that
- 2:31:41ground we've already covered that ground
- 2:31:43I I believe so I think that's very mean
- 2:31:45of him to do that to you but uh we'll
- 2:31:47take a lunch break now thank you for
- 2:31:48taking it early I appreciate appreciate
- 2:31:50it um we'll be in recess until I'm going
- 2:31:52to say
- 2:31:5212:15 thank and and and I I'll make one
- 2:31:55other point before before we leave um
- 2:31:57it's my understanding that exhibit 110 I
- 2:32:00believe what it was called is all set to
- 2:32:03go so we might want to start um we come
- 2:32:06back with uh introducing 110 and then
- 2:32:08getting that admitted um for any cross-
- 2:32:10examination that might come from that so
- 2:32:13um you're honor is that available to
- 2:32:16council I
- 2:32:18it I going to say could you want to send
- 2:32:20it to her right now or okay you do that
- 2:32:23so you have a lunch to look at but um
- 2:32:25and so you can take a look at that but
- 2:32:26we'll take care of that housekeeping
- 2:32:28matter when we first start otherwise
- 2:32:30have a fine lunch we'll be back in about
- 2:32:31an hour and 15 minutes thank you thank
- 2:32:48you
- 2:33:18e
- 2:33:48e
- 2:34:18e
- 2:34:48e
- 2:35:18e
- 2:35:48e
- 2:36:18e
- 2:36:48e
- 2:37:18e
- 2:37:48e
- 2:38:18e
- 2:38:48e
- 2:39:18e
- 2:39:48e
- 2:40:18e
- 2:40:48e
- 2:41:18e
- 2:41:48e
- 2:42:18e
- 2:42:48e
- 2:43:18e
- 2:43:48e
- 2:44:18e
- 2:44:48e
- 2:45:17e
- 2:45:47e
- 2:46:17e
- 2:46:47e
- 2:47:17e
- 2:47:47e
- 2:48:17e
- 2:48:47e
- 2:49:17e
- 2:49:47e
- 2:50:17e
- 2:50:47e
- 2:51:17e
- 2:51:47e
- 2:52:17e
- 2:52:47e
- 2:53:17e
- 2:53:47e
- 2:54:17e
- 2:54:47e
- 2:55:17e
- 2:55:47e
- 2:56:17e
- 2:56:47e
- 2:57:17e
- 2:57:47e
- 2:58:17e
- 2:58:47e
- 2:59:17e
- 2:59:47e
- 3:00:16e
- 3:00:46e
- 3:01:16e
- 3:01:46e
- 3:02:16e
- 3:02:46e
- 3:03:16e
- 3:03:46e
- 3:04:16e
- 3:04:46e
- 3:05:16e
- 3:05:46e
- 3:06:16e
- 3:06:46e
- 3:07:16e
- 3:07:46e
- 3:08:16e
- 3:08:46e
- 3:09:16e
- 3:09:46e
- 3:10:16e
- 3:10:46e
- 3:11:16e
- 3:11:46e
- 3:12:16e
- 3:12:46e
- 3:13:16e
- 3:13:46e
- 3:14:16e
- 3:14:46e
- 3:15:15e
- 3:15:45e
- 3:16:15e
- 3:16:45e
- 3:17:15e
- 3:17:45e
- 3:18:15e
- 3:18:45e
- 3:19:15e
- 3:19:45e
- 3:20:15e
- 3:20:45e
- 3:21:15e
- 3:21:45e
- 3:22:15e
- 3:22:45e
- 3:23:15e
- 3:23:45e
- 3:24:15e
- 3:24:45e
- 3:25:15e
- 3:25:45e
- 3:26:15e
- 3:26:45e
- 3:27:15e
- 3:27:45e
- 3:28:15e
- 3:28:45e
- 3:29:15e
- 3:29:45e
- 3:30:14e
- 3:30:44e
- 3:31:14e
- 3:31:44e
- 3:32:14e
- 3:32:44e
- 3:33:14e
- 3:33:44e
- 3:34:14e
- 3:34:44e
- 3:35:14e
- 3:35:44e
- 3:36:14e
- 3:36:44e
- 3:37:14e
- 3:37:44e
- 3:38:14e
- 3:38:44e
- 3:39:14e
- 3:39:44e
- 3:40:14e
- 3:40:44e
- 3:41:14e
- 3:41:44e
- 3:42:14e
- 3:42:44e
- 3:43:14e
- 3:43:44e
- 3:44:14e
- 3:44:44e
- 3:45:13e e
- 3:45:55all right sorry about that know I was
- 3:45:57forgetting something um all right uh
- 3:46:01Tracy you can can hear me I can hear you
- 3:46:04Trac Tracy cor
- 3:46:07reporter sorry about that all right uh
- 3:46:12we will go back on the record
- 3:46:15uh Mr with the preceding number 23
- 3:46:20a-01
- 3:46:2297t uh Mr Carlson I hope you had a good
- 3:46:24lunch hope you made a mean phone call uh
- 3:46:28to people who should be here and uh I
- 3:46:32will remind you that you are still under
- 3:46:33oath and I understand alrighty um and
- 3:46:38and Miss old we'll get back to you in
- 3:46:40just a moment let's take care of uh
- 3:46:42getting that last that final exhibit
- 3:46:44entered evidence and then we'll go back
- 3:46:45to the Cross examination okay thanks
- 3:46:48judge okay um Mr Carlson when we had uh
- 3:46:52we were doing your direct testimony a
- 3:46:54little earlier I believe you had
- 3:46:55indicated that you had one change to one
- 3:46:57of the exhibits that you had submitted
- 3:46:59with your testimony is that correct
- 3:47:01that's correct okay um can I ask uh um
- 3:47:06uh that exhibit 110 be displayed please
- 3:47:17um can you tell us what exhibit 110
- 3:47:19represents um it shows the calculations
- 3:47:23that um uh get to the MRC rate for the
- 3:47:27ethernet monthly tariff charge okay and
- 3:47:31I know we haven't verbally talked much
- 3:47:32about this but can you can you explain
- 3:47:34the difference between the the
- 3:47:36non-recurring ethernet charges and the
- 3:47:38monthly recurring charges sure um um the
- 3:47:43the the non-recurring charges are uh
- 3:47:46charges that are up front that are for
- 3:47:49uh uh any any fiber installation that's
- 3:47:53required to a paap or uh or and the
- 3:47:56equipment the optical equipment needed
- 3:47:59um at the premise of the of the of the
- 3:48:02of the pp location that would be either
- 3:48:05equipment that we're required to put in
- 3:48:07place or if we're working with a third
- 3:48:09party that they would require the the
- 3:48:11MRC the monthly recurring charge which
- 3:48:14is reflected here are are costs that are
- 3:48:17ongoing in nature uh they are the cost
- 3:48:19of providing the
- 3:48:20service okay and um uh you had indicated
- 3:48:26that this exhibit 110 is is an update is
- 3:48:28this is this an update of what was
- 3:48:30previously I think attached to exhibit
- 3:48:34um 100 as
- 3:48:39sd-3 yes okay and um what update did uh
- 3:48:44did you main again why the the the Top
- 3:48:47Line total cost of Last Mile transport
- 3:48:49went down a little bit there were U some
- 3:48:53changes to the the cost um uh
- 3:48:56calculations that were done that that
- 3:48:58cost calculation done at all the piz up
- 3:49:02locations that are um in question here
- 3:49:06and so there were some some minor
- 3:49:08changes to that that reduced the overall
- 3:49:10cost so that's what we're passing
- 3:49:12through here okay and did did and then
- 3:49:15what's the the bottom number 24 25 what
- 3:49:19does that represent um that represents a
- 3:49:22monthly recurring cost that would be
- 3:49:23added into the Tariff um um per
- 3:49:26concurrent call
- 3:49:28session okay i' asked to move into
- 3:49:33evidence exhibit
- 3:49:34110 any objection to
- 3:49:38110 not hearing any one0 shall be
- 3:49:40admitted okay uh thank you your honor
- 3:49:44and uh this point I would uh tender
- 3:49:46again uh Mr Carlson to continue his
- 3:49:49cross all right Mar go right ahead uh
- 3:49:53I'd like to pick up where we just left
- 3:49:55off Mr Carlson so can we have exhibit
- 3:49:57110
- 3:49:59displayed and I just want to point out
- 3:50:01for the record that I believe that was
- 3:50:03supposed to be a confidential exhibit
- 3:50:04but it has been displayed already so I
- 3:50:07don't think I'm violating any commission
- 3:50:09Rules by asking that the same exhibit
- 3:50:12that Council just reviewed uh public
- 3:50:15be displayed
- 3:50:17again that's right and just to clear the
- 3:50:19record I I had communicated uh uh with M
- 3:50:23Fred Rico that we were not displaying
- 3:50:25this confidentially so there there's no
- 3:50:26issue with that okay thank you um Mr
- 3:50:31Carlson with respect to exhibit
- 3:50:34110
- 3:50:37um the concurrent session count the
- 3:50:40second to the last row uses the number
- 3:50:42600 do you see that
- 3:50:45I do so to get to the
- 3:50:49$24.25 for the increase to the monthly
- 3:50:52recurring charge per concurrent session
- 3:50:55you divided the number
- 3:50:5814,557 by 600 correct that's correct if
- 3:51:03we use the number 623 the actual number
- 3:51:07of concurrent sessions uh sold under
- 3:51:10tariff 25 right now that number
- 3:51:13decreases
- 3:51:15correct the math would produce that
- 3:51:18result yes okay and do you have any
- 3:51:20reason to dispute my representation that
- 3:51:22if you divide that number by 623 you get
- 3:51:25$23 36 no dispute no dispute
- 3:51:30okay um and that
- 3:51:33$233
- 3:51:35uh6 or
- 3:51:37$24.25 that is not in exhibit
- 3:51:42101 attachment sd4 for page two which we
- 3:51:46looked at previously which is the
- 3:51:48increase over 24 months to the
- 3:51:51MRC up to
- 3:51:53$310
- 3:51:55186
- 3:51:57correct correct we're using different
- 3:51:59concurrent session counts whether it's
- 3:52:01the build projects or the uh ethernet
- 3:52:05upgrade so what you're proposing is that
- 3:52:08the governing bodies in Colorado pay an
- 3:52:11increase based on the pro proposed
- 3:52:13projects of an MRC of
- 3:52:1933 some
- 3:52:21dollars
- 3:52:23correct well
- 3:52:25the O overall there's no change to all
- 3:52:28the governing bodies it's the same
- 3:52:30amount that you're you're recovering
- 3:52:34when you change the denominator
- 3:52:35obviously it it changes the the rate for
- 3:52:38the con current session but overall the
- 3:52:40amounts the
- 3:52:41same I'm asking you under tariff
- 3:52:4525 what will the monthly recurring
- 3:52:48charge total for all these projects be
- 3:52:51will it be the $310 186 if all of those
- 3:52:55projects are approved on a 24mon basis
- 3:52:59or will it be over
- 3:53:01$330 per concurrent session per
- 3:53:06month um so
- 3:53:12the the overall charge will be a
- 3:53:14combination of um the the calculation
- 3:53:18that we did for the MRC for the build
- 3:53:20projects and the MRC for the ethernet
- 3:53:24monthly charge here can we please put up
- 3:53:27exhibit 101 attachment sd4 page
- 3:53:43two thank you
- 3:53:45so I just want to make sure I understand
- 3:53:46your testimony correctly Mr car
- 3:53:50uh I'm drawing a blank is it
- 3:53:53Carlson you got it you got it my sincere
- 3:53:56apologies no no worries no worries um
- 3:54:01you're saying on the bottom chart when
- 3:54:03we're looking at 623 concurrent sessions
- 3:54:06over a 24mon recovery period there will
- 3:54:09be a tariff charge per concurrent
- 3:54:12session per month of
- 3:54:16$108
- 3:54:18plus a charge as reflected in exhibit
- 3:54:24110 correct that's correct that's
- 3:54:27correct and I would only note that the
- 3:54:29charge we're looking at now the 310
- 3:54:31would assume 24 months of those
- 3:54:34charges uh the the the $24 25 cent
- 3:54:39charge would would continue on past two
- 3:54:42years yes the exhibit 10 amount would go
- 3:54:45on
- 3:54:46indefinitely as long as we incur the
- 3:54:48cost yes okay and you understand staff
- 3:54:52has objected to that proposal correct I
- 3:54:57understand with respect to Sonet let's
- 3:55:00go back just to Big Picture stuffs um if
- 3:55:02I understood your testimony earlier
- 3:55:04correctly Sonet is old it's bad it's
- 3:55:06Legacy technology it needs to go away
- 3:55:09period
- 3:55:11correct um it it you're right it's a
- 3:55:14legacy technology that will phase out
- 3:55:16over time yes excellent and I just need
- 3:55:19short answers so we can keep moving here
- 3:55:21EET it's good it's the I think you
- 3:55:24called it the standard into the future
- 3:55:26correct correct so Century Link needs to
- 3:55:29transition off of Sonet as a company for
- 3:55:32all of its customers
- 3:55:34correct over time I would expect that
- 3:55:37and it can sell additional services like
- 3:55:39internet and voice over internet
- 3:55:42increases capacity faster speed all
- 3:55:44those good things correct those would be
- 3:55:47one of the benefits yes with respect to
- 3:55:50the application here you state on
- 3:55:52exhibit 100 the actual second amended
- 3:55:55application which is attachment
- 3:55:58SD uh-1c on page 10 revision one that a
- 3:56:03few locations have begun this conversion
- 3:56:06process however no charges have been
- 3:56:09assessed can you explain uh what are the
- 3:56:12locations that have begun the conver
- 3:56:15process um I I don't have the list of
- 3:56:18the locations
- 3:56:19specifically um committed to memory so I
- 3:56:23can't specifically answer that um I I
- 3:56:26would tell you that they are locations
- 3:56:28where it was determined there was an
- 3:56:30immediate need uh for um an upgrade to
- 3:56:34happen and so um we uh moved forward uh
- 3:56:38with a sense of urgency you cannot
- 3:56:41recall one of the locations that had
- 3:56:44this immediate need I I don't have the
- 3:56:46list in front of me
- 3:56:48no and um you can't say how many there
- 3:56:50are six
- 3:56:54okay um and what was the immediate
- 3:56:57need um I I don't know specifically the
- 3:57:00situation there would have been some uh
- 3:57:02performance of the of the equipment or
- 3:57:04the the technology there that um was uh
- 3:57:08such that we need to take immediate
- 3:57:13action with respect to those um uh six
- 3:57:17they have not been charged for that
- 3:57:19immediate need that was addressed
- 3:57:22correct not yet but they're included in
- 3:57:24our cost estimates here correct are they
- 3:57:27on an auto augment
- 3:57:29program um I'm not sure what you mean by
- 3:57:31an auto
- 3:57:33augment um we're going to look at the
- 3:57:36the project then specifically as
- 3:57:37presented in the amended plan and we're
- 3:57:39going to review some Concepts in there
- 3:57:41but I want to talk about that amended
- 3:57:43plan which again is um hearing exhibit
- 3:57:48100 attachment sd1
- 3:57:51Das
- 3:57:53c
- 3:57:54um you would agree with me upon your
- 3:57:57review of that that there's no mention
- 3:58:00in the second amended application of
- 3:58:01last M diversity
- 3:58:04true correct that was something added
- 3:58:07later um and why was it
- 3:58:11omitted I I I don't know why it was
- 3:58:13omitted we um U went through a process
- 3:58:16of internal evaluations and um um uh
- 3:58:21asked a broader set of individuals to be
- 3:58:23a part of that on our side and it was
- 3:58:25determined that this needed to be added
- 3:58:27to the to the
- 3:58:28proposal at the time the second amended
- 3:58:31application was submitted in February of
- 3:58:332024 Century Link already possessed
- 3:58:36quotes for the 27 fiber builds that um
- 3:58:41it's proposing quotes from Comcast and
- 3:58:43GT
- 3:58:45correct um I'm not sure when we got
- 3:58:47those
- 3:58:49quotes if I showed you a copy would that
- 3:58:52help refresh your
- 3:58:54memory that's fine well you can show me
- 3:58:57a copy of it since I don't know you're
- 3:58:58not really refreshing my memory okay um
- 3:59:01I would offer exhibits uh 602 and
- 3:59:07603 I can only show one at a time so
- 3:59:10what should I start with first let's do
- 3:59:12602 and I will email these to council
- 3:59:14right
- 3:59:16now um this says it's
- 3:59:21confidential um so whatever nature is
- 3:59:24needed um I think it's this the last
- 3:59:27pages that are
- 3:59:30confidential I can't answer that for you
- 3:59:33um if it's confidential and you want to
- 3:59:34show something confidential I have to
- 3:59:37there's some steps we have to take I
- 3:59:38have to turn off the stream um you'll
- 3:59:40have to tell me which people who are in
- 3:59:41the zoom are allowed to see it
- 3:59:44um so it's it's a question for you more
- 3:59:47than me okay um I think it's important
- 3:59:50to address this and we might as well do
- 3:59:52it now while they're they're up um so
- 3:59:55can we stop the stream and I can review
- 3:59:58these with um all parties on in Zoom
- 4:00:02have signed ndas that does going to be
- 4:00:04my first question is there anyone in
- 4:00:05here who has not signed an
- 4:00:09NDA if they haven't they should leave
- 4:00:12right now
- 4:00:15uh so judge I'll I'll get started on
- 4:00:18that it's probably gon to it's going to
- 4:00:19take me a few minutes to get everything
- 4:00:21set up I I'll let you know when I'm when
- 4:00:23I'm ready okay well hang on um have
- 4:00:26missar you haven't sent this to centur
- 4:00:27link this do they do you have cop do you
- 4:00:30have copies of this centry link have
- 4:00:33copies of this uh not marked your your
- 4:00:35honor not yet I'm still waiting I'm sure
- 4:00:37I have copies of it because I think we
- 4:00:39I'm G to say if you want to take a look
- 4:00:40at it and see if you think that there is
- 4:00:42something that's confidential I mean
- 4:00:44I'm assuming it's one of your documents
- 4:00:47yeah I think it's customer I'm guessing
- 4:00:49if I'm anticipating from the questions
- 4:00:51I'm guessing it's quotes that we
- 4:00:52received from uh third parties that I
- 4:00:55think we had promised the third parties
- 4:00:57that we would maintain in conference we
- 4:00:59had okay so okay yeah it's it's
- 4:01:02confidential information that really
- 4:01:03belongs to third parties you know bids
- 4:01:06um and I think it belongs to them um and
- 4:01:08we had we had agreed to maintain the
- 4:01:10confidentiality of their pricing when we
- 4:01:13obtained uh this now obviously we yeah
- 4:01:16so that's that's that we're going to
- 4:01:18have to we're going to have to maintain
- 4:01:19the confidentiality around that I'm
- 4:01:21sorry okay okay M Federico if you can sh
- 4:01:25us off the stream perfect um and you
- 4:01:27said everybody in here is okay to stay
- 4:01:30right as far as I know if if there's
- 4:01:32anyone who has not signed an NDA um for
- 4:01:35this information they are to leave I
- 4:01:37don't see a whole lot of people in here
- 4:01:39so um
- 4:01:57there
- 4:01:58okay um we're done with confidential
- 4:02:01exhibits may I proceed hang on I'm
- 4:02:04trying to make sure the stream is up
- 4:02:05I'll let you know as soon as it's ready
- 4:02:07okay thank you
- 4:02:15Mr Snider is there a way that you can
- 4:02:17just show Mr
- 4:02:21Carlson no
- 4:02:24well maybe you know I mean uh if I turn
- 4:02:28the camera off you'll see the entire
- 4:02:31um
- 4:02:33room um that's fine I just thought it'd
- 4:02:36be easier to see his face but that's
- 4:02:37okay
- 4:02:41yeah I go back I take take
- 4:02:45spot and I'm ready on my
- 4:02:47end okay thank you um I want to go back
- 4:02:52to um exhibit 101 attachment
- 4:02:56sd4 revision
- 4:02:582 page three this is a public
- 4:03:11document page three yes
- 4:03:16so we were just reviewing the costs
- 4:03:18associated with the proposed project for
- 4:03:20the ethernet upgrade that's the fourth
- 4:03:23column here correct right correct and we
- 4:03:26looked and found the $1.76 million total
- 4:03:30correct right and then um there's uh 6%
- 4:03:36overhead added and then the capital
- 4:03:38costs correct correct those amounts were
- 4:03:42not included in the original application
- 4:03:44true no they weren't okay and The Last
- 4:03:48Mile diversity wasn't included in the
- 4:03:51original application true
- 4:03:57correct I do not recall can you explain
- 4:04:01why Last Mile diversity wasn't um
- 4:04:05included in the original second amended
- 4:04:07application yeah I just want to make
- 4:04:09sure real quickly because I now I got
- 4:04:11into this case late but I think there's
- 4:04:13been three applications has this been
- 4:04:15amended twice is that correct mean when
- 4:04:17you say the original application I just
- 4:04:19want to know which one we're talking
- 4:04:20about yeah um thank you judge um so
- 4:04:24there is the original application in
- 4:04:252023 that was
- 4:04:27withdrawn I'm referring to the amended
- 4:04:30application filed on February 15
- 4:04:352024 and that substantively similar to
- 4:04:39the second amended application that is
- 4:04:41an exhibit which referred references to
- 4:04:44Lumen removed them okay so so when
- 4:04:47you're talking about the original
- 4:04:48application you're talking about what
- 4:04:50could be number two not the original one
- 4:04:53filed back in 2023 exactly the first one
- 4:04:56filed in 202 okay thank you thank
- 4:05:00you so my question to you Mr Carlson was
- 4:05:03why didn't sentury link explain that the
- 4:05:06ethernet upgrade project came with Last
- 4:05:09Mile diversity to the 911 stakeholders
- 4:05:12when it filed its amended application on
- 4:05:15February 15
- 4:05:182024 um I I wasn't a part of the the
- 4:05:22filing and so um I I don't know why it
- 4:05:26wasn't included at that
- 4:05:28time are the costs associated with the e
- 4:05:31or net upgrade firm
- 4:05:34costs um there there are best estimate
- 4:05:37of what we think the costs are so
- 4:05:40they're cost based on our experience on
- 4:05:42our pricing model models um so they're
- 4:05:45they're solid
- 4:05:48estimates
- 4:05:49okay
- 4:06:07um you agree that with respect to um
- 4:06:16the direct testimony filed May 10th
- 4:06:192024 that's when the last M diversity
- 4:06:22piece was first explained to the um
- 4:06:26parties to this proceeding
- 4:06:31correct
- 4:06:38um yes okay that's Che the date I uh I
- 4:06:43feel ask with respect to the
- 4:06:44conversations with stakeholders that
- 4:06:47preceded the filing in February of 2024
- 4:06:50Last Mile diversity had been part of
- 4:06:52those conversations
- 4:06:54correct I wasn't a part of the
- 4:06:56conversations um and so uh I I I can't
- 4:07:00say specifically whether they were in
- 4:07:01there or not but uh um um so I'm not
- 4:07:06sure whether they were or not okay you
- 4:07:08defer to the actual uh
- 4:07:11testimony refers to things discussed
- 4:07:14correct right no I I agree with that
- 4:07:18okay um in that direct testimony which
- 4:07:22is exhibit 100 which is a public
- 4:07:24document if we could go to page exhibit
- 4:07:27100 at page nine
- 4:08:03um at lines excuse me 6 through eight it
- 4:08:07indicates
- 4:08:09that uh the costs included in the plan
- 4:08:12did not reflect the the ethernet upgrade
- 4:08:14would also include a diverse Last Mile
- 4:08:17connection to 62p apps utilizing another
- 4:08:21carriers Network that would be managed
- 4:08:24by Lumen is that an accurate
- 4:08:27statement yes and uh who's the other
- 4:08:32carrier uh it would be either Comcast or
- 4:08:39GTE and so they are providing ongoing
- 4:08:42services
- 4:08:45or I'm sorry
- 4:08:47Lumen Lumen would be providing ongoing
- 4:08:50services so um yes what what uh Comcast
- 4:08:56and GTE are providing is the underlying
- 4:08:59connectivity with their uh fiber
- 4:09:03facilities what we are providing is a
- 4:09:05service that goes across it so we're
- 4:09:08able to um uh have that diversification
- 4:09:12but still control over the
- 4:09:16services and with respect to that
- 4:09:18diversification if I understood you
- 4:09:20correctly you don't know if that diverse
- 4:09:22last mile is physically and
- 4:09:24geographically
- 4:09:27diverse
- 4:09:29um I I I don't have the information on
- 4:09:32exactly where the routes go the Sentry
- 4:09:34Link route and the third party route
- 4:09:38whether they're
- 4:09:40um what what paths they take I don't
- 4:09:42know that
- 4:09:44and with respect to this management by
- 4:09:46Lumen is Lumen being compensated or or
- 4:09:49which Lumen entity are you is being
- 4:09:51referred to
- 4:09:53there
- 4:09:55um Lumen would seek to have our cost
- 4:09:58recovered via the the Tariff item that
- 4:10:00we're proposing that would be the the
- 4:10:02compensation okay so Lumen there refers
- 4:10:05to Quest Corporation the BP
- 4:10:13uh I I you know I'm um I'm not
- 4:10:17completely clear on the affiliate um um
- 4:10:22names and you know which legal entities
- 4:10:25come at play uh in certain situations so
- 4:10:29um you know uh U that that would sound
- 4:10:33reasonable to me but I I I don't know
- 4:10:35for sure to be
- 4:10:37honest so as you sit here today you
- 4:10:40don't know if part of the analys is for
- 4:10:44the total cost for the ethernet upgrade
- 4:10:47project includes costs that the
- 4:10:51BP might be paying to an affiliate you
- 4:10:54just don't know as you sit here
- 4:10:57today is that
- 4:11:00correct
- 4:11:02um I know that
- 4:11:05um I know that in this case um uh will
- 4:11:10be build by these third party providers
- 4:11:12so
- 4:11:13um those um th those costs would come to
- 4:11:17you know the the legal entity that's
- 4:11:19contracted with those third party
- 4:11:21providers I know that um um kind of the
- 4:11:25um um internal uh relationship between
- 4:11:29the various legal entities of of lumen
- 4:11:32that's not my expertise okay um but but
- 4:11:35the costs come in and um to to the Lumen
- 4:11:39organization and um um we're seeking
- 4:11:44the the Tariff item to recover those
- 4:11:47costs okay you used a interesting phrase
- 4:11:51the legal entity Contracting with
- 4:11:53thirdparty
- 4:11:55providers
- 4:11:56um with respect to exhibit 602 which is
- 4:12:01confidential there was a client named
- 4:12:04there do you recall the name of that
- 4:12:06client yes or I don't I
- 4:12:09don't
- 4:12:12um and you don't have a copy of exhibit
- 4:12:15602 handy I don't want to display it
- 4:12:17because it's
- 4:12:18confidential um
- 4:12:22but if it's a centry link affiliate and
- 4:12:26not Quest Corporation what's the
- 4:12:29significance that an affiliate is the
- 4:12:32legal entity Contracting with the third
- 4:12:34party provider uh I'm not sure the
- 4:12:37significance of
- 4:12:38that and you're not sure that affiliate
- 4:12:41is somehow being compensated through
- 4:12:43this Improvement plan process in
- 4:12:45addition to what quest is being
- 4:12:50compensated uh in addition there's no
- 4:12:52double compensation if that's the
- 4:12:54question I'm not sure I understand your
- 4:13:02question there is no fee that Quest
- 4:13:05would have to pay to the affiliate for
- 4:13:06the affiliate being a the client
- 4:13:09Contracting with the third
- 4:13:11party so
- 4:13:13um the the the area of affiliate
- 4:13:16transactions at Lumen is not my area of
- 4:13:18expertise so uh I'm I I really I really
- 4:13:22don't know okay I'm gonna ask a late
- 4:13:25person
- 4:13:27question with respect to the
- 4:13:30current Last Mile connections there
- 4:13:33there is no PF in Colorado that
- 4:13:36has um primary and a secondary
- 4:13:40connection for the last mile true
- 4:13:45um they have today they have um uh uh
- 4:13:50two connections the connections are
- 4:13:52provided by Lumen um we we provide a
- 4:13:56service called MLS across those those
- 4:13:59Bond ones to those locations but they're
- 4:14:02so there uh there is a level of
- 4:14:05resiliency that you get with one
- 4:14:06provider sorry could you say that again
- 4:14:09the fbl across the bonded T1 did you say
- 4:14:14I apologize um today we delivered two
- 4:14:20circuits to each piece app location but
- 4:14:23Lumen provides both we use a technology
- 4:14:26called
- 4:14:28Ms and um that does provide a level of
- 4:14:32resiliency because it's two separate
- 4:14:35circuits but uh we will enhance that
- 4:14:37resiliency by having those circuits
- 4:14:40provided by two separate carriers and or
- 4:14:43two separate physical
- 4:14:49circuits
- 4:14:53okay is the
- 4:14:56Sonet is removing
- 4:14:59sonnet related to the ethernet well let
- 4:15:03me strike it let me say it this
- 4:15:07way for the diverse paths being proposed
- 4:15:11for this last mile divers the Comcast
- 4:15:13and
- 4:15:15gtt there's no ethernet upgrade needed
- 4:15:18for those
- 4:15:21true
- 4:15:22[Music]
- 4:15:24um those are ethernet connections aren't
- 4:15:27they you can
- 4:15:32um you can order you can get another
- 4:15:35ciruit from a third provider and run a
- 4:15:38T1 across it you could do that okay but
- 4:15:41there would be no reason to do that why
- 4:15:43we're going to ethernet it would be
- 4:15:45taking a half step forward instead of
- 4:15:47taking three giant leaps there's no
- 4:15:50reason that the um Comcast connection
- 4:15:53which is an ethernet connection can't
- 4:15:55become the primary connection for that p
- 4:15:57app is there well we have to be able to
- 4:16:00manage the service so we're not going to
- 4:16:01buy Ethernet from Comcast we'll buy the
- 4:16:05underlying connectivity and then manage
- 4:16:08the service ourselves so our knock has
- 4:16:10visibility to the to the p so we have
- 4:16:13control over the over the network is
- 4:16:17ethernet
- 4:16:19connectivity uh so um
- 4:16:24um connectivity at like at a starting
- 4:16:27point is the the physical thing that
- 4:16:29makes a connection so fiber is what
- 4:16:31we're talking about here it's a physical
- 4:16:34connection from one point to the other
- 4:16:37what you run across that physical
- 4:16:39connection are services so ethernet is a
- 4:16:42service it's called a switching
- 4:16:44service um um on you can also pair that
- 4:16:48with IP which is a routing service but
- 4:16:51they all run across a physical
- 4:16:53connection so you could run ethernet
- 4:16:56over
- 4:16:57copper um but you wouldn't get much
- 4:17:00bandwidth because there's not very much
- 4:17:02bandwidth with copper fiber gives you
- 4:17:05that reliability and gives you that
- 4:17:08bandwidth okay so let me ask it a
- 4:17:10different way to avoid the 27 fiber
- 4:17:13builds that you originally proposed in
- 4:17:16the ethernet upgrade is it an option
- 4:17:19just to use say the Comcast fiber that
- 4:17:24has been quoted and built in for last M
- 4:17:26diversity well and that's what we did
- 4:17:28but only where it's only where when it's
- 4:17:30there so you'll note that some of the
- 4:17:33locations um on our proposal don't have
- 4:17:36that multiple carrier diversity because
- 4:17:39that second option is just not there and
- 4:17:42so in that case the diversity would be
- 4:17:44two separate um fiber paths that Lumen
- 4:17:48would would provide but you're not going
- 4:17:50to have those options in every situation
- 4:17:52it just depends on the geography and
- 4:17:54where the service providers are so for
- 4:17:56example we look
- 4:17:58specifically um at some where Sentry
- 4:18:01Link was the primary and say Comcast was
- 4:18:04the secondary correct right and can you
- 4:18:09avoid a fiber build related to the
- 4:18:11ethernet upgrade by making what you
- 4:18:14propose as the secondary the primary
- 4:18:16well then you would be back where you
- 4:18:18started so you would be getting both of
- 4:18:20your connections from one provider which
- 4:18:22would be
- 4:18:23Comcast the purpose is to have dual
- 4:18:26riders but you avoid a fiber
- 4:18:29build well um if um theoretically
- 4:18:35because I don't know each situation
- 4:18:37different if Comcast had two physically
- 4:18:39diverse fibers going to a location
- 4:18:43then uh
- 4:18:45theoretically Comcast could use one and
- 4:18:47we could use one but that's part of the
- 4:18:49vetting process that we go through our
- 4:18:51Engineers go through to look at each
- 4:18:53situation and look at what's available
- 4:18:55in that situation and then design an
- 4:18:58approach that maximizes what we're
- 4:19:01trying to accomplish okay and that work
- 4:19:03has been done there's engineering
- 4:19:04drawings showing all that um I don't
- 4:19:07know about drawings but there's
- 4:19:09certainly been engineering evaluation
- 4:19:11okay um
- 4:19:14um with respect to this last mile
- 4:19:17diversity and and getting the second
- 4:19:21connection is that capacity so let's
- 4:19:24let's say for a multi-tenant building
- 4:19:26and you're getting it to the building by
- 4:19:29doing that ethernet upgrade are there
- 4:19:31other tenants who can uh purchase
- 4:19:34additional uh Services as a result of
- 4:19:37that ethernet
- 4:19:38upgrade um not in this case I mean there
- 4:19:42are um situations where we'll build
- 4:19:45fiber out to a location that has
- 4:19:47multiple tenants in it and we'll put a
- 4:19:50device there that allows that to be
- 4:19:52split out to multiple users um we don't
- 4:19:55do that with 911 nobody else uses
- 4:19:58facilities to the pp but the pp so we
- 4:20:01wouldn't um we wouldn't um break that up
- 4:20:05and have multiple tendons using it okay
- 4:20:08but by building the fiber you might have
- 4:20:11extra capacity that you could allocate
- 4:20:14to another tenant in the same building
- 4:20:17true uh we wouldn't do that so no I mean
- 4:20:20we that's just something we wouldn't do
- 4:20:22and in fact I've not run across a pep
- 4:20:24that wasn't a separate physical location
- 4:20:27um and so uh um if we're going to build
- 4:20:32fiber to a location to a p app it'll
- 4:20:35just be used by that
- 4:20:37peap
- 4:20:39okayy I got stop you for one second um
- 4:20:41how much more do you you
- 4:20:43have
- 4:20:44[Music]
- 4:20:46um probably another hour your honor
- 4:20:49another hour okay
- 4:20:53um we're about an hour in after lunch
- 4:20:55here so um look for taking a break then
- 4:20:59in about um somewhere between 15 to 30
- 4:21:03minutes look for a stopping point sounds
- 4:21:09great
- 4:21:11um e
- 4:21:51um Mr Carlson uh can you do the last
- 4:21:55mile diversity piece of this project
- 4:21:57without getting rid of
- 4:22:01Sonet
- 4:22:06no and can you do the last mile
- 4:22:09diversity piece with without the
- 4:22:11ethernet upgrade
- 4:22:16well so there's there's degrees of
- 4:22:19diversity here so you you can um get
- 4:22:23diversity by just having t1s to um TDM
- 4:22:29t1s to a PP um um but
- 4:22:35um it's important in the design
- 4:22:38conversations to understand where we are
- 4:22:41going in the fure future and um the
- 4:22:45importance of having fiber facilities
- 4:22:48going to the PPS so more data can be
- 4:22:51provided to the peps I'm not aware when
- 4:22:54you're building new facilities whether
- 4:22:56it's copper or Fiber that the the cost
- 4:22:59is materially different and so uh it
- 4:23:02makes more sense to put fiber in place
- 4:23:05as a future technology to uh enable
- 4:23:09capabilities for peps in the future yeah
- 4:23:11you're not putting TDM t1s anymore are
- 4:23:14you no no we're
- 4:23:16not and you're trying to get actually
- 4:23:19get rid of them out of your
- 4:23:20network they are they are aging out of
- 4:23:22the network yes and that's for all
- 4:23:25customers not just 911 that's across the
- 4:23:28board local exchange carriers across the
- 4:23:31country are doing
- 4:23:32this I want to go to the portable
- 4:23:36generator and fuel um trailer portion of
- 4:23:40your project um
- 4:23:43is that relate to the network power
- 4:23:45Excuse Me Network backup power component
- 4:23:48of the FCC audit
- 4:23:50yes and we've looked at that I believe
- 4:23:53that FCC audit is now exhibit 601 and we
- 4:23:57and it
- 4:23:58um we don't need to look at it but with
- 4:24:02respect to the second amended
- 4:24:04application and its explanation of this
- 4:24:06project it uses the term wire centers
- 4:24:08what's a wire
- 4:24:10Center um you know um
- 4:24:13it's a a similar concept as a central
- 4:24:17office you know a wire Center is is more
- 4:24:20of a geographic area but it it orients
- 4:24:23around a central office the central
- 4:24:25office is the physical building
- 4:24:31okay so with respect to the network
- 4:24:33network backup power and we can can pull
- 4:24:36it up but there were 74 Central offices
- 4:24:39listed um that served 7 for peaps does
- 4:24:44that sound right to
- 4:24:46you uh I think the psap count is higher
- 4:24:49than that but um but I don't know the
- 4:24:52exact P
- 4:24:54count
- 4:24:57um with respect to that entry a lot of
- 4:25:01them and we might as well pull it up if
- 4:25:03we could pull up please um exhibit 601 I
- 4:25:07believe
- 4:25:13and if you don't mind turning to page
- 4:25:17um 27 I think would be about
- 4:25:24right and that's really hard to read but
- 4:25:27if we could
- 4:25:30um what's the area you want to zoom in
- 4:25:33on you have to ask me a difficult
- 4:25:35question um let me pull it up on my end
- 4:25:39and see if I can
- 4:25:43a better
- 4:25:44guide just I can't get it all on the
- 4:25:46screen if I don't have an area so
- 4:26:03yeah please bear with me for just a
- 4:26:05minute
- 4:26:33um with respect to this document on page
- 4:26:37[Music]
- 4:26:3927 if we could um look at
- 4:26:44the uh rows that have um if you're if
- 4:26:49you're on the left side if you could go
- 4:26:53back four columns and focus in on those
- 4:26:57that have
- 4:26:58text there we go
- 4:27:02so on this FCC audit there are
- 4:27:05particular entries for Central offices
- 4:27:08or wire centers serving P apps where the
- 4:27:12alternative measures for the amount of
- 4:27:14backup power indicate a need for have a
- 4:27:16portable generator readily available do
- 4:27:19you see that I see that and if we could
- 4:27:21scroll over to the
- 4:27:26um Right Far Right column there you
- 4:27:31go um the very last column description
- 4:27:34of alternative measures for Tandem
- 4:27:37generators on those um it says site
- 4:27:40served by portable gen set
- 4:27:42I'm
- 4:27:45on Eighth down do you see
- 4:27:50that I'm counting down can you read that
- 4:27:53again it says site served by portable
- 4:27:57Genet okay and then um go down three
- 4:28:02more and it says site served by portable
- 4:28:05generator do you see that I do are those
- 4:28:09are you representing to the FCC that
- 4:28:11those
- 4:28:12sites are already um served by a
- 4:28:15portable
- 4:28:18generator
- 4:28:20um I I don't know I I'm not sure whether
- 4:28:23we're we're um describing that as um an
- 4:28:27alternative or that it's in place
- 4:28:39okay would you agree that a portable
- 4:28:41generator serving a central office
- 4:28:43benefits all of centry Link's customers
- 4:28:46not just
- 4:28:48911 yes and in particular in the areas
- 4:28:52where the proposal is to place
- 4:28:56a portable generator and station it I
- 4:28:59believe at Clear
- 4:29:03Creek
- 4:29:08um centry link has local customers in
- 4:29:11that area
- 4:29:13yes I believe
- 4:29:22so with respect to the um four Central
- 4:29:26offices directly serving paaps that
- 4:29:29we're talking about um Georgetown no
- 4:29:32longer has a paap and Cheyenne Wells no
- 4:29:34longer has a paap
- 4:29:37correct yes that's my understanding okay
- 4:29:39and so we're talking about Central City
- 4:29:41um not Clear Creek Central City and hot
- 4:29:43Sulfur Springs are the two uh Central
- 4:29:46offices at issue correct right and um
- 4:29:50with respect to those um neither have
- 4:29:53experiences out experienced outages due
- 4:29:56to a loss of power
- 4:29:59true I don't know that for for sure I
- 4:30:02know both have battery backups so there
- 4:30:05is some supplemental power available is
- 4:30:08but is a battery but my question is have
- 4:30:11either of those Central offices
- 4:30:13experienced outages due to a loss of
- 4:30:15power and I think you said you do not
- 4:30:17know I I don't
- 4:30:22know with respect to all of the other
- 4:30:24Central offices listed on um the FCC
- 4:30:28audit here there is a generator that
- 4:30:31Sentry Link paid for to serve those
- 4:30:33Central offices correct
- 4:30:36correct and
- 4:30:39um why are these
- 4:30:45different um well I can't I can't
- 4:30:47specifically answer that um but I would
- 4:30:50say broadly that um all of these
- 4:30:54examples here across all these
- 4:30:56locations um were um decisions were made
- 4:31:00to put these um uh this equipment here
- 4:31:03ba based on assessments that were done
- 4:31:06at the time and and the facts that we
- 4:31:08had and so the decision was made at that
- 4:31:10time to to uh put the facilities there
- 4:31:14put the generators there um and to have
- 4:31:17the company pay for the generator uh I'm
- 4:31:20not sure how the yeah I I'm not sure
- 4:31:23exactly what the the funding mechanism
- 4:31:25was for them but um um in the our
- 4:31:29recommendation for this
- 4:31:31particular uh project um is um you know
- 4:31:35being triggered by um you know the
- 4:31:38journey that we're on uh to improve
- 4:31:40resiliency for or 911 so so that's why
- 4:31:44it's it's being Advanced within the
- 4:31:46context of of this docket okay
- 4:31:54um and earlier in your testimony you
- 4:31:57said that portable generator would
- 4:31:59benefit all customers of Cent link not
- 4:32:02just 911 but you take the position in
- 4:32:05this proceeding that
- 4:32:07911 uh rate payers should ultimately
- 4:32:10bear 100% of the cost of that portable
- 4:32:14generator um well it's the same set of
- 4:32:17rate payers either way but um um what
- 4:32:21I'm saying is that the the the
- 4:32:24triggering event for the consideration
- 4:32:28of of this particular recommendation is
- 4:32:32the is the um the infrastructure
- 4:32:35Improvement a journey that we're on and
- 4:32:38so when we make decisions about um how
- 4:32:41to spend available Capital will align
- 4:32:44the capital spend with um really the
- 4:32:48triggering event that um um causes it
- 4:32:52okay and so how to align a capital spend
- 4:32:55means when the company's going to reach
- 4:32:56into his own pocket and pay for a
- 4:32:59permanent generator or portable
- 4:33:01generator and when the company is not
- 4:33:03going
- 4:33:04to it those decisions are made and my
- 4:33:07question is why in this particular
- 4:33:11instance even though the benefit of the
- 4:33:15portable generator also serves non bees
- 4:33:19customers why is 911 bearing 100% of the
- 4:33:23cost
- 4:33:25um simply because this is the you know
- 4:33:28the approach that we're taken with all
- 4:33:30the projects that that that we're
- 4:33:32recommending that um the you know the
- 4:33:36projects are are being um designed and
- 4:33:39implemented for the this particular
- 4:33:42purpose and and so it's our position
- 4:33:46that the um the the charges should
- 4:33:48follow what that purpose is and same
- 4:33:51with the fuel trailer that'll serve
- 4:33:53other Central offices too right it's
- 4:33:55it's mobile it's mobile correct and it
- 4:33:58can serve permanent generators you know
- 4:34:00give whatever fuel they need also
- 4:34:03correct correct and that benefits um not
- 4:34:06just 911 but all centry links customers
- 4:34:09served by that c those Central offices
- 4:34:12true I think there could potentially be
- 4:34:14other uses for it yes okay if we could
- 4:34:17pull up please pull up exhibit 100
- 4:34:20attachment s oh this is confidential
- 4:34:22hold on a
- 4:34:25minute um Let me let me ask this
- 4:34:27question without pulling up the
- 4:34:29confidential exhibit the the cost of
- 4:34:32this particular um portable generator is
- 4:34:37125,00 plus correct correct and that
- 4:34:41includes cludes uh the equipment and the
- 4:34:44freight doesn't
- 4:34:45it uh I haven't seen the cost estimate
- 4:34:48but um I would assume it would be all in
- 4:34:51and that would include um a a charge for
- 4:34:54startup and commissioning by The Entity
- 4:34:56you're purchasing it from True um I
- 4:34:59would anticipate that yes okay and so
- 4:35:02for purposes of tying everything
- 4:35:04together that would be within exhibit
- 4:35:06100 attachment SD
- 4:35:081-7 C page three but I would like to
- 4:35:12pull up exhibit 101 attachment
- 4:35:16sd4 which is a public document at page
- 4:35:28three and I want to look at these um
- 4:35:31entries the generator and fuel trailer
- 4:35:34are the last two on the right side
- 4:35:36correct correct and so the total
- 4:35:39generator cost is uh Allin um
- 4:35:42128,000 plus correct correct and then um
- 4:35:48Central Link is going to own that
- 4:35:49equipment outright at the end of the day
- 4:35:52right uh yes there will be no
- 4:35:54restrictions on on its use or oversight
- 4:35:57for its intended purpose
- 4:36:00correct um I I I I don't know how the
- 4:36:03how the equipment that what the
- 4:36:05operating procedures are for it but we
- 4:36:07it will be an asset on by
- 4:36:10lumit and and um with respect to the
- 4:36:13cost of the generator earlier we looked
- 4:36:15at if these projects are approved and
- 4:36:18and the uh MRC is increased to
- 4:36:22$310 per month centry link could make a
- 4:36:25choice to allocate the first month so
- 4:36:28March of
- 4:36:292025 to this cost of the generator and
- 4:36:32avoid the 15% Capital costs of um 20
- 4:36:38roughly 40,600
- 4:36:44correct
- 4:36:49um I I guess I want to make sure I'm
- 4:36:52understanding what your
- 4:36:53question um allocate one months worth of
- 4:36:58128,000 and and then that would be the
- 4:37:02only cost
- 4:37:04recovered immediately with the first
- 4:37:07receipt of funds could go to this outof
- 4:37:11pocket purchase so that it's not spread
- 4:37:13over 24 months because it's just a
- 4:37:15paperwork entry on Sentry Link's part
- 4:37:18right so this is where I'm confused
- 4:37:22since the Tariff wouldn't be approved
- 4:37:25until March of next year and we would
- 4:37:27get reimbursement one month at a time uh
- 4:37:31if we're going to incur the cost in
- 4:37:332024 or even if we incur the cost in
- 4:37:362025 we would still get the
- 4:37:38reimbursement one month at a time over
- 4:37:41the 24 month time period depending upon
- 4:37:45where if you prate among all projects a
- 4:37:49certain amount but if you took the first
- 4:37:51month's payment which earlier we looked
- 4:37:53at was approximately
- 4:37:56$193,000 and allocated it to the
- 4:37:58generator we wouldn't have the
- 4:38:00additional 15% Capital carrying costs
- 4:38:03per
- 4:38:03year well we're GNA we're going to spend
- 4:38:08128,000 so we're going to get the
- 4:38:10capital cost either way
- 4:38:12so so that's just a function of of how
- 4:38:15that works so um um you know our
- 4:38:20position in this is that um the the
- 4:38:23recovery of those Capital costs would
- 4:38:26come from um um through this mechanism
- 4:38:31okay so your answer is no you're the 15%
- 4:38:35per
- 4:38:36year on top of the amount for Capital
- 4:38:40costs cannot be avoided under any
- 4:38:42circumstance for any of these
- 4:38:45projects well I guess what I'm saying is
- 4:38:47the scenario that you're describing I
- 4:38:49don't see as a likely scenario so I so
- 4:38:53no so that's correct the capital costs
- 4:38:55cannot be
- 4:38:57avoided um not based on our
- 4:38:59recommendation
- 4:39:02no how many fuel trailers does centry
- 4:39:05link have in Colorado now I I don't
- 4:39:09know what's the overhead associated with
- 4:39:13um owning a fuel
- 4:39:15trailer um I I don't know for sure I
- 4:39:18would speculate it's um like any piece
- 4:39:21of equipment like that it's it's um
- 4:39:23maintenance to the equipment it's um
- 4:39:26repairs when things break ongoing
- 4:39:28preventive maintenance Mr old is your
- 4:39:3110-minute warning I'm cutting it off in
- 4:39:33about 10 minutes
- 4:39:35okay um you understand that rule 2143
- 4:39:39requires the company to take on the cost
- 4:39:41of future maintenance or do you not
- 4:39:43understand that uh I'm not familiar with
- 4:39:46that okay just want to touch briefly on
- 4:39:49the middle mile fiber builds those are
- 4:39:51again inter office diversity projects
- 4:39:53between Century Links Central offices
- 4:39:56true correct and the benefit is not
- 4:40:00exclusive then to basic emergency
- 4:40:01service
- 4:40:03true um we've identified right at this
- 4:40:06point that the use of these facilities
- 4:40:08would be
- 4:40:09911 uh any future use we just have not
- 4:40:13Quantified that um and so Mr Carlson I
- 4:40:17have 10 minutes so I just want you to if
- 4:40:19I if it's a yes or no answer you can
- 4:40:21give me please do so so we can continue
- 4:40:24um expeditiously I'm going to jump I'm
- 4:40:27talking about the break we're taking a
- 4:40:28break in 10 minutes I'm not cutting you
- 4:40:29off okay oh goodness thank you yeah yeah
- 4:40:32no no that that's what I meant by that I
- 4:40:34told I told you we're taking a break in
- 4:40:35about 30 in there and look for a
- 4:40:37stopping point so I hopefully you don't
- 4:40:39got a whole lot more after that but um
- 4:40:42but don't don't I'll give you time after
- 4:40:45a break but that's what I'm talking
- 4:40:46about thank you judge I appreciate that
- 4:40:48and my blood pressure dropped a few
- 4:40:49points as a
- 4:40:51result um it's 137 now
- 4:40:59um did in its analysis of what would be
- 4:41:02best for improving resiliency and
- 4:41:05reliability of the network did the
- 4:41:08company
- 4:41:09consider uh add diversity B going to a
- 4:41:13carrier neutral location which are
- 4:41:15throughout the state of
- 4:41:19Colorado we um you know we looked at all
- 4:41:22the options available I don't know about
- 4:41:24that one specifically okay and if you
- 4:41:27went to a carryer neutral location you
- 4:41:29would avoid uh the commonality of a a
- 4:41:32Sentry length building
- 4:41:36right um yes and you would avoid the
- 4:41:40equipment com com ality that may exist
- 4:41:42for 911 within that building
- 4:41:47correct uh the theoretically yes all
- 4:41:51three of the projects proposed for
- 4:41:53Middle mile infrastructure um in the
- 4:41:55second am in the second amended
- 4:41:58application um those were in the middle
- 4:42:00mile segments correct right and that's
- 4:42:04for inter office diversity for wire
- 4:42:06centers serving pabs correct correct
- 4:42:10there are nine wire centers that
- 4:42:12currently lack this diversity
- 4:42:15correct I I believe so I don't recall
- 4:42:17that exact amount but sounds
- 4:42:21right so the sole purpose of these
- 4:42:24proposed new fiber builds is a secondary
- 4:42:27path solely for 911 in the middle mile
- 4:42:32correct and with respect to those
- 4:42:34secondary paths what you're proposing is
- 4:42:37a new fiber build placing 144 strands
- 4:42:41where Century Link will light 12 of
- 4:42:44them and use two for 911 specific
- 4:42:48secondary path correct
- 4:42:51correct on none of the three fiber
- 4:42:53builds that you submitted you intended
- 4:42:56to replace the primary path that is
- 4:42:58currently in use is that
- 4:43:01correct I believe so that includes tell
- 4:43:05your ride to
- 4:43:08Norwood is that correct
- 4:43:13um I believe
- 4:43:18so I'm not aware that there's an already
- 4:43:21existing path between Telly ride and
- 4:43:23Norwood for 911 traffic but I believe
- 4:43:28so correct there's no um intent to
- 4:43:33replace the the currently uh the current
- 4:43:37uh Norwood facility that wire Center
- 4:43:40primary PA for those question um so if
- 4:43:44your question is have we move have we
- 4:43:46removed that project from the list yes
- 4:43:48we've removed it nope um my question is
- 4:43:51a little bit different and it's poorly
- 4:43:52worded I
- 4:43:54apologize with respect to the tellure
- 4:43:56Norwood Bild it was not Sentry Link's
- 4:43:59intent to replace the primary path for
- 4:44:02calls that go to the Norwood wire Center
- 4:44:06no that is a correct statement correct
- 4:44:09so Century Links still at some point in
- 4:44:12time has to figure out what to do for
- 4:44:14the Norwood wire Center which is
- 4:44:16microwave radio
- 4:44:19correct I I yeah I think that that's
- 4:44:22that's an open that's an open issue that
- 4:44:24we're going to have to work pro and
- 4:44:26that's an OSP
- 4:44:31issue
- 4:44:34um possibly I I I'm not sure I don't I'm
- 4:44:37not sure what you mean by
- 4:44:39that well should 911 pay for the Norwood
- 4:44:43wire Center microwave
- 4:44:45radio upgrade or
- 4:44:47change well we're not asking for that um
- 4:44:51so I think what we would do is we would
- 4:44:53go into this that particular situation
- 4:44:57and we would um um evaluate that
- 4:45:00situation with all the available data
- 4:45:03but replacing that radio system is a
- 4:45:07different consideration than um a
- 4:45:11diversity to that wire Center so that
- 4:45:13particular question we've not wrestled
- 4:45:24with it is an accurate statement that
- 4:45:27prior to filing the application in
- 4:45:29February of
- 4:45:302024 centry link did not reach out to
- 4:45:32any third party about using the third
- 4:45:35party resources as an alternative to a
- 4:45:37new
- 4:45:39build that
- 4:45:41um I I don't know that for a fact we we
- 4:45:45talk to third party re uh Partners all
- 4:45:47the
- 4:45:49time you know if uh well strike
- 4:45:53that how many opportunities exist in
- 4:45:56Colorado to add an additional layer of
- 4:45:58resiliency for paaps by grooming
- 4:46:01additional thirdparty
- 4:46:05facilities
- 4:46:06um
- 4:46:08by by grooming I would say say um if by
- 4:46:12grooming you mean um um you know adding
- 4:46:16adding new network routes then that's
- 4:46:18what we're proposing for the for the
- 4:46:20piece applications with the diverse
- 4:46:23ethernet project um as it relates to
- 4:46:26other parts of the network I'm not
- 4:46:28familiar with what that number would
- 4:46:31be um you there are some situations
- 4:46:35where thirdparty
- 4:46:36facilities uh could be groomed with uh
- 4:46:40not too much time and not too much
- 4:46:42expense is that a correct
- 4:46:45statement
- 4:46:46uh I I I'm sure that situation
- 4:46:53exists but there's been no study to
- 4:46:55identify those um opportunities correct
- 4:47:00well we don't Lumen doesn't routinely do
- 4:47:03grooming specific to third party
- 4:47:05locations we groom the whole network so
- 4:47:08I'm not aware of any studies
- 4:47:16uh your honor it's um 143 I didn't know
- 4:47:19if you wanted to take a break now that
- 4:47:22would be perfect let's take a break
- 4:47:23right now we take a break until two
- 4:47:25o'clock
- 4:47:27um the mean you should I I've got you
- 4:47:30around three hours already over three
- 4:47:32hours so which is what you put in there
- 4:47:34for hopefully you should I'll let you go
- 4:47:36a little bit more but please try and
- 4:47:38make sure that it's related to a project
- 4:47:40and especially projects that are are no
- 4:47:42longer being um considered in this
- 4:47:44proceeding um so we'll take a break and
- 4:47:48we'll take a break until two o'clock uh
- 4:47:51and then Mr Carlson you'll hopefully be
- 4:47:53close to be being somewhat
- 4:47:56done no
- 4:48:09problem
- 4:48:39e
- 4:49:09e
- 4:49:39e
- 4:50:09e
- 4:50:39e
- 4:51:09e
- 4:51:39e
- 4:52:09e
- 4:52:39e
- 4:53:09e
- 4:53:39e
- 4:54:09e
- 4:54:39e
- 4:55:09e
- 4:55:39e
- 4:56:09e
- 4:56:39e
- 4:57:09e
- 4:57:39e
- 4:58:09e
- 4:58:39e
- 4:59:09e
- 4:59:39e
- 5:00:08e
- 5:00:38e
- 5:01:08e
- 5:01:38e
- 5:02:08e
- 5:02:38e
- 5:03:08e e
- 5:04:08all right
- 5:04:10I call to trace you to make sure you can
- 5:04:12hear me I can hear you
- 5:04:15alrighty uh we shall go back on the
- 5:04:18record with receding 23 a-01
- 5:04:22197t Mr Carlson guess wa where you
- 5:04:26at hopefully the camera apparently there
- 5:04:30he
- 5:04:31is I thought I thought You' escaped I
- 5:04:34was going to be proud of you Mr Del was
- 5:04:36going to suddenly end up there you know
- 5:04:38they keep tackling me when head for the
- 5:04:40door so I think I'm here for the
- 5:04:42duration all right well since you're
- 5:04:44here for the duration during that
- 5:04:46duration you are still under oath yes
- 5:04:49sir uh Miss odar I give you a few more
- 5:04:51minutes but please be heading towards
- 5:04:53the uh the finish line if you would I
- 5:04:56will I have a probably a total of four
- 5:04:58questions I'm going to offer some uh
- 5:05:01more outage reports and then I have
- 5:05:02three confidential exhibits I do want to
- 5:05:05review um and so that will require
- 5:05:08unfortunately stopping the live stream I
- 5:05:10have looked at the list of uh people
- 5:05:12signed on to this proceeding and I see
- 5:05:15Andrew Damron who is cca's uh witness
- 5:05:18who signed in NDA I also see a ccoa
- 5:05:22member Kathy rley uh she has also signed
- 5:05:24in NDA so I don't think anybody on the
- 5:05:29in the zoom call would need to be
- 5:05:32excluded okay all right all right good
- 5:05:35going Mr Carlson all the three builds
- 5:05:38that you proposed in the second
- 5:05:39recommended application in those areas
- 5:05:42centry link has local customers correct
- 5:05:45correct to whom it's providing Services
- 5:05:48um not just
- 5:05:49911 correct and ultimately with respect
- 5:05:53to these new fiber builds if uh approved
- 5:05:56Sentry Link would get to own those
- 5:05:58facilities
- 5:06:00correct correct nothing would prevent
- 5:06:03though centry link from choosing to
- 5:06:04transfer ownership to cot or CBO or any
- 5:06:07other entity correct
- 5:06:10um I'm not familiar with the
- 5:06:13requirements of that so I'm not sure
- 5:06:15what the restrictions might be okay well
- 5:06:18we're talking about 144 strands where 12
- 5:06:20will be lit and two will be dedicated to
- 5:06:23911 correct correct correct so the
- 5:06:26excess capacity hypothetically of any
- 5:06:29new fiber build could be uh used for a
- 5:06:32swap with another carrier
- 5:06:34correct um I I I I I guess
- 5:06:38hypothetically there could be different
- 5:06:40options but we're not aware of any and
- 5:06:43and hypothetically the dark fiber could
- 5:06:45be leased to an entity who is
- 5:06:48interested assuming there's a assuming
- 5:06:51there's a market in those geographies
- 5:06:53but um hypothetically yes okay and uh
- 5:06:56those types of situations would generate
- 5:06:58Revenue
- 5:07:00potentially uh it it it depends on the
- 5:07:04situation
- 5:07:06okay uh if only if you didn't charge but
- 5:07:11you allow somebody
- 5:07:14fiber um you know each each Situation's
- 5:07:18different each has its own
- 5:07:19characteristics and so uh um I I would
- 5:07:23say that um in this case um we're we
- 5:07:27were able to identify the the costs and
- 5:07:30then the reimbursement mechanism that's
- 5:07:32within a particular set of projects but
- 5:07:35things that might happen in the future
- 5:07:37um how how the revenue might flow with
- 5:07:40that I I just don't know we just have to
- 5:07:42that's hypothetical at this point okay
- 5:07:45but it would be fair for the um if this
- 5:07:48any of those fiber builds were approved
- 5:07:50for there to be conditions placed such
- 5:07:52as if you did generate any revenue from
- 5:07:54any circumstance that that go back to
- 5:07:57the 911 Community that'd be fair
- 5:08:00wouldn't
- 5:08:01it well it it depends on the situation
- 5:08:04so I'm not sure I'm I'm not really in a
- 5:08:07position to say whether that would be
- 5:08:08fair or not
- 5:08:10okay uh your honor at this time we would
- 5:08:12offer from um proceeding
- 5:08:1523m 0197
- 5:08:18T outage investigation report
- 5:08:222312
- 5:08:252311
- 5:08:28239 and
- 5:08:342314
- 5:08:362309 or 232
- 5:08:4039
- 5:08:422309 okay then what was the last one and
- 5:08:45then
- 5:08:472314 okay and that's from proceeding 23m
- 5:08:51what
- 5:08:530197 T is in Tom
- 5:09:00okay and just
- 5:09:02um for completeness um those two um two
- 5:09:07of those 23-11 11 relates to chaffy and
- 5:09:1223-9 relates to Clear Creek um those are
- 5:09:17referred to by Century Link in answers
- 5:09:19to
- 5:09:20interrogatories which are within exhibit
- 5:09:22um an exhibit to be offered exhibit 600
- 5:09:26okay so let let me get get what you got
- 5:09:27here so you have four reports from
- 5:09:32preceding
- 5:09:3323m 0197 T correct and what are these
- 5:09:38reports
- 5:09:40these are outage investigation reports
- 5:09:41for Century Link took a certain position
- 5:09:44on a fiber cut that it wasn't in the
- 5:09:47basic emergency service network it was
- 5:09:48in the OSP Network or uh they centry
- 5:09:52link thought it had groomed to provide a
- 5:09:55diverse path and it wasn't actually
- 5:09:58groomed and this goes to the whole uh
- 5:10:01dispute in this application about um
- 5:10:04what's in the public interest what where
- 5:10:07money should be spent for approving the
- 5:10:10basic emergency service network okay and
- 5:10:12you want administrative notice taken of
- 5:10:14those four reports from that proceeding
- 5:10:16correct yes please all right any
- 5:10:19objection
- 5:10:20to these reports being administratively
- 5:10:22noticed uh yes youron I think with that
- 5:10:25explanation is of the relevance I have
- 5:10:27to object because I don't think the
- 5:10:28scope of this proceeding as is as
- 5:10:31explained by m old this I don't think
- 5:10:33the scope here is whether or not what's
- 5:10:36what projects are in the best public
- 5:10:38interest I think whether or not you know
- 5:10:40the five or six projects depending how
- 5:10:42you count them here uh meet this the
- 5:10:44criteria and the rules so if these outer
- 5:10:47reports are being offered for um any
- 5:10:50type of advocacy concerning public
- 5:10:53interest of these being the best
- 5:10:55projects I think they're irrelevant
- 5:10:57beyond the scope and any response go
- 5:11:00ahead if I could briefly respond this
- 5:11:02isn't a judicatory a judicatory
- 5:11:04proceeding under the APA governed by The
- 5:11:07Rules of Evidence but not you know
- 5:11:09strictly and the ccoa community 20
- 5:11:13governing bodies would like its voice
- 5:11:15heard with respect to the issues about
- 5:11:17the application and the content and the
- 5:11:20priorities for improving the basic
- 5:11:22emergency service network and in
- 5:11:25particular their view of of where State
- 5:11:28911 sear charge fund should be increased
- 5:11:31and used um we should be able to respond
- 5:11:35to the applicant statements in the
- 5:11:36application and the materials and
- 5:11:38support and um we think it is relevant
- 5:11:43because the basic emergency service
- 5:11:44network is part of the Core Business of
- 5:11:47governing bodies who provide emergency
- 5:11:49telephone service and emergency
- 5:11:50notification service and so the
- 5:11:54commission may ultimately disagree and
- 5:11:56decide
- 5:11:58um that it will not give much weight to
- 5:12:01the arguments that the interveners that
- 5:12:03I represent are making but I don't think
- 5:12:06the evidence should be excluded and we
- 5:12:08should be able to it to our statement of
- 5:12:10position that we will ultimately file in
- 5:12:12this case in support of our positions
- 5:12:14well I tell you what um report
- 5:12:172312 if I take that in that should make
- 5:12:21me not want to approve which
- 5:12:24project it should make you not want to
- 5:12:27under uh approve any new fiber build
- 5:12:30because we need to go back and reassess
- 5:12:32what currently exists and what's groomed
- 5:12:34to carry 911 traffic and what's not and
- 5:12:37there has been no initial assessment
- 5:12:40of of what the current status of the
- 5:12:41network is we had outage and we learned
- 5:12:44after the fact that something was not
- 5:12:47groomed that's much more costeffective
- 5:12:49and a better use of a dollar than doing
- 5:12:51any new Bild well it's not I mean if you
- 5:12:54had if you had a compos opposing project
- 5:12:56forward I could look at that but there's
- 5:12:58no opposing project so that report is
- 5:13:01going these reports are going to make it
- 5:13:02more likely that I am not going to to
- 5:13:05approve any fiber build project is that
- 5:13:07correct is that is that the relevance of
- 5:13:10them that is the relevance of the
- 5:13:12Improvement plan application in
- 5:13:14compliance with all of the sections of
- 5:13:16the rule including um 2143
- 5:13:20B1 um a through e which is going to the
- 5:13:25stakeholders having informal
- 5:13:27consultations having things that are
- 5:13:29based on actual outages those are actual
- 5:13:32outages your honor okay that's that's
- 5:13:35fine that's fine again I want to see how
- 5:13:37this is relevant or why do I care about
- 5:13:38this so there's fiber cuts that are out
- 5:13:40there these are going to be reports of
- 5:13:42fiber Cuts is that correct two of the
- 5:13:44four are okay and so how and so and so
- 5:13:48because there were fiber Cuts I'm not
- 5:13:50going to approve new fiber is that
- 5:13:53correct is that the premise is that the
- 5:13:56premise
- 5:13:58of new fiber builds that cost a lot of
- 5:14:02money in areas that serve different
- 5:14:04paaps than doing a full assessment of
- 5:14:08whether we could to spend that same
- 5:14:09amount of money and figure out what
- 5:14:11currently we have and whether it's
- 5:14:13groomed appropriately whether it's
- 5:14:15tested and maintained appropriately so
- 5:14:17that traffic is actually flowing as
- 5:14:19people believe so that we can mitigate
- 5:14:22against the harm of an outage well this
- 5:14:25you're you're talking about a giant look
- 5:14:27at at everything that should be done in
- 5:14:28the state it sounds like but this is
- 5:14:30individual individual outages
- 5:14:33correct these are individual outage and
- 5:14:36so how does that how does that get me to
- 5:14:37to this gigant look at the entire world
- 5:14:40of how I should redo everything that
- 5:14:42they're proposing I don't I don't see
- 5:14:45that I think it goes your honor to the
- 5:14:48the the heart and the the purpose behind
- 5:14:50will 2143 be and in particular it's the
- 5:14:53projects I have to look at the projects
- 5:14:56under and so this and so this if this is
- 5:14:59relevant to me it should make it more or
- 5:15:01less likely that I want to approve that
- 5:15:02project now if you told me there was an
- 5:15:04outage one day one place through the
- 5:15:06fiber cut I'm not quite sure why that
- 5:15:08would make it more or less likely that
- 5:15:09that project should be approved well I
- 5:15:12think you heard testimony today in
- 5:15:13particular that uh for example the
- 5:15:16Denver main office has not had a 911
- 5:15:19outage let's refocus those dollars to
- 5:15:22areas that have had outages where they
- 5:15:24weren't roomed and examine those and
- 5:15:27it's subsection
- 5:15:29B
- 5:15:30Roman uh six six that talks about
- 5:15:35projects that have the potential to
- 5:15:36reduce the likelihood of outages based
- 5:15:38on past patterns of outages in the
- 5:15:41network which these are and based on the
- 5:15:43existence of points in the network
- 5:15:45equipment or software that represent a
- 5:15:47lack of redundancy and diversity the
- 5:15:49ccoa community is aware and wants to
- 5:15:52bring those forth and that's a specific
- 5:15:55requirement in the rule where this what
- 5:15:58goes it's not a cram down of what centry
- 5:16:00link wants it should have been a more
- 5:16:02iterative process and collaborative
- 5:16:04process I understand the judge you don't
- 5:16:06agree with me but we believe these
- 5:16:08should be received into the record for
- 5:16:10purposes of making the appropriate and
- 5:16:12thorough arguments and we shouldn't be
- 5:16:15uh uh constrained by what centry link
- 5:16:18chose and obviously there just a dispute
- 5:16:20about whether they complied with
- 5:16:22subsection B1 romanet 6 1 through
- 5:16:27five and the the point is there's a lot
- 5:16:31of ways to improve this network it's not
- 5:16:33just the FCC audit there's a lot more
- 5:16:36going on and our voice should be heard
- 5:16:39your voice is heard that's what I've
- 5:16:41been listening to your voice since about
- 5:16:429:15 this morning so uh it's heard quite
- 5:16:45well but it has to be heard on relevant
- 5:16:48matters and what I can do stuff about
- 5:16:50and on this one I don't think I can so
- 5:16:52I'm not going to accept those in I think
- 5:16:54they go are not relevant in this matter
- 5:16:56and so I'm not going to administratively
- 5:16:58notice those individual things there um
- 5:17:01next anything more I have three
- 5:17:04confidential exhibits I would like to
- 5:17:05display so we need to go off the Record
- 5:17:07please
- 5:17:09uh what are these concern before we go
- 5:17:11off the Record and doing there the fiber
- 5:17:13builds that are um at issue in the
- 5:17:14states that have been proposed in the
- 5:17:16second amended application all
- 5:17:18right Casey if you can take care of us
- 5:17:21here yes um again just confirming
- 5:17:23everybody here is allowed to be here
- 5:17:26yeah if anyone who's not signed an NDA
- 5:17:28needs to get out if you have the control
- 5:17:30of someone who doesn't have one get them
- 5:17:32out of here
- 5:18:05all righty I think we are all set oh all
- 5:18:08right I'll talk slow then make sure uh
- 5:18:12let's see next up is best
- 5:18:15911 Joseph bener your
- 5:18:18honor can you hear me I can hear you I
- 5:18:21can't see you though yeah my microphone
- 5:18:24went out before lunch and in getting
- 5:18:27that reconnected I apparently lost my
- 5:18:29video I apologize all right
- 5:18:34um and I also apologize that uh
- 5:18:39the questions we're going to ask and the
- 5:18:40matters I'm going to discuss are in
- 5:18:43confidential documents there'll somehow
- 5:18:46introduce it's probably easy just keep
- 5:18:48it on confidential rather than jumping
- 5:18:50on and off wow I wish you would have
- 5:18:52told me that a minute
- 5:18:54ago I I
- 5:18:59apologize am I going back now
- 5:19:03or
- 5:19:05please okay give me a couple minutes
- 5:19:10can you confirm everyone I don't know
- 5:19:12what you're showing so can you confirm
- 5:19:13everyone here is allowed to to see what
- 5:19:15you're showing is everyone here I guess
- 5:19:17again if you have not signed an NDA in
- 5:19:19this please
- 5:19:20leave I don't see a whole lot of extra
- 5:19:22people in here
- 5:19:48all right I think we're good to go all
- 5:19:51right Mr Cox you may
- 5:19:53proceed thank you your honor uh good
- 5:19:56afternoon Mr Carlson hello thanks for
- 5:19:59hanging in all day um it's nice to meet
- 5:20:02you you'll be happy to know I I
- 5:20:04certainly uh won't have as many
- 5:20:06questions for you won't uh take us with
- 5:20:08as much as you time as we have so far um
- 5:20:10so hopefully we can go pretty quickly
- 5:20:12and uh shouldn't get into try to avoid
- 5:20:17getting into the the confidential
- 5:20:18material um if we can um but just kind
- 5:20:24of as a as a reset can you clarify for
- 5:20:26me um what your role has been in the
- 5:20:28development and planning of of the
- 5:20:30projects that are proposed in the
- 5:20:31Improvement
- 5:20:33plan um so uh um as I described ear
- 5:20:38earlier my my role broadly at at Lumen
- 5:20:42is to um um be in uh involved in the the
- 5:20:48customer experience of our 911 customers
- 5:20:50across the country so obviously uh
- 5:20:53Colorado is uh a portion of that
- 5:20:56responsibility there's a team members
- 5:20:58who work directly for me who are
- 5:21:00involved qu uh um quite extensively in
- 5:21:03the state as as well as engineering
- 5:21:06resources and Customer Care Resources
- 5:21:08you are involved in the state and so uh
- 5:21:11I I have an awareness at that level um
- 5:21:14in this particular proceeding the the
- 5:21:17the work that was done to to get to the
- 5:21:19point of this
- 5:21:21application um I've had an awareness of
- 5:21:23that but I haven't been directly
- 5:21:25involved in the preparation of of the of
- 5:21:28the plan I've certainly have spent a lot
- 5:21:30of time um uh over the past uh several
- 5:21:34weeks um when um Mr Doo wasn't able to
- 5:21:38to be part of this hearing and so I'm
- 5:21:40I'm familiar with it and I'm familiar
- 5:21:42with the practices of the company
- 5:21:44generally since I've had the you know
- 5:21:46the pleasure of being a part of this
- 5:21:48team for 35
- 5:21:50years you were not directly involved in
- 5:21:52the development of the the projects the
- 5:21:56proposal the cost estimates no
- 5:22:00okay um and in looking at the costs um
- 5:22:04are you familiar with commission rule
- 5:22:062143b
- 5:22:08which requires the Improvement plan to
- 5:22:10provide firm estimated costs for the
- 5:22:13projects other things yes okay um and it
- 5:22:18would be fair to say that Century Link
- 5:22:20did not have all estimated cost
- 5:22:22information concerning the proposed
- 5:22:24project when it filed its amended
- 5:22:26application in
- 5:22:27February right we made some changes to
- 5:22:30it and that was correct after the at the
- 5:22:34time of the second amended application
- 5:22:36as well in March yes correct
- 5:22:39and when Mr do filed his direct
- 5:22:41testimony in May correct and when Mr L
- 5:22:45filed his supplemental direct testimony
- 5:22:47as well in June correct and including up
- 5:22:52until
- 5:22:53today
- 5:22:55um centy link has continued to make
- 5:22:58changes to its costs its estimated
- 5:23:02costs um we we certainly changed the
- 5:23:05numbers the the uh the the um evaluation
- 5:23:10has uh continued to be ongoing and we've
- 5:23:12made changes where it's
- 5:23:15appropriate but it's it's fair to say
- 5:23:17that Century Link is at a difficult time
- 5:23:19in determining the cost for the pro
- 5:23:21proposed
- 5:23:22projects I I wouldn't probably
- 5:23:24characterize it as difficult I would
- 5:23:26certainly say that um it's been
- 5:23:28iterative and it's it's it's it's uh
- 5:23:30evolved over
- 5:23:33time but uh yeah like you said it has
- 5:23:37been revised um but now with your latest
- 5:23:41proposal today or latest addition
- 5:23:44exhibit uh
- 5:23:47110 um is it your position that
- 5:23:50the estimated costs are now final in the
- 5:23:56final uh form that they're going to be
- 5:23:59proposed
- 5:24:01for projects they are and and they they
- 5:24:04would be correct and accurate correct
- 5:24:07yes
- 5:24:09um I want to shift specifically to the
- 5:24:12overhead costs um in Mr Lo's direct
- 5:24:17testimony he describes one of the
- 5:24:19changes that he made in that testimony
- 5:24:21from the second amended application um
- 5:24:24as the addition of a cost factor for
- 5:24:26shipping handling sales tax job site
- 5:24:30delivery
- 5:24:31Etc are you familiar with that I am um
- 5:24:36and and I believe this is what what Mr
- 5:24:38Del describ or refers to an a
- 5:24:39supplemental direct testimony as
- 5:24:41overhead cost is that correct
- 5:24:45correct uh Miss Federico if we could
- 5:24:47pull up hearing exhibit 101 attachment
- 5:24:50sd4 rev
- 5:25:032 this would be page three
- 5:25:09I know we've looked at this a lot um and
- 5:25:13I know you talked with Miss older about
- 5:25:17overhead cost and the
- 5:25:206% um but that's and that 6% was applied
- 5:25:25for the overhead cost for all proposed
- 5:25:27projects regardless of the differences
- 5:25:29in the
- 5:25:31projects correct all all them so it was
- 5:25:35it was uh applied to all the cost
- 5:25:38associated with uh five of the six
- 5:25:41projects the ethernet upgrade project
- 5:25:44those costs there are just the
- 5:25:46non-recurring charges so there are
- 5:25:49additional monthly recurring charges
- 5:25:51that are not reflected here sure thank
- 5:25:54you for that for that clarification yes
- 5:25:56just the non-recurring Char charges for
- 5:25:58the um
- 5:26:00ethernet um but there's no breakdown or
- 5:26:05detailed analysis of of these costs for
- 5:26:08each project anywhere in the testimony
- 5:26:10no there's not other than the examples
- 5:26:13of what's in there but not a breakdown
- 5:26:15yeah I think you referred to these
- 5:26:16before as solid estimates based on prior
- 5:26:20experience of of Century Link correct so
- 5:26:24basically rough
- 5:26:26estimates they're factors correct
- 5:26:28they're factors that we play against the
- 5:26:30the
- 5:26:34numbers um looking specifically at the
- 5:26:37generator project
- 5:26:39um the total there and that's
- 5:26:43um for the actual equipment cost says
- 5:26:48it's uh
- 5:26:50$128,500
- 5:26:5325 um and is that that's taken from a
- 5:26:58quote uh that's contained in hearing
- 5:27:01exhibit 100 attachment
- 5:27:05sd17 C on page three is that correct
- 5:27:08correct
- 5:27:10yes um and that quote and we don't have
- 5:27:13to bring it up because it's confidential
- 5:27:15and hopefully if you have it in front of
- 5:27:16you go ahead and look at it um that
- 5:27:20quote includes an amount for Freight on
- 5:27:23page three is that correct
- 5:27:26correct and is it your general
- 5:27:28understanding that FR Freight uh refers
- 5:27:32to shipping
- 5:27:35costs generally yeah
- 5:27:38okay um
- 5:27:41yet on shipping costs as we already
- 5:27:45talked about were included in overhead
- 5:27:47costs as well
- 5:27:50right yeah I uh um shipping costs were
- 5:27:55referenced by Mr Doo as a an example of
- 5:27:58the items that could be viewed as
- 5:28:00overhead expenses it doesn't mean that
- 5:28:03in every
- 5:28:04single um situation all of the over head
- 5:28:08expenses are incurred so um as I think
- 5:28:12you know you you've identified here I I
- 5:28:15think the the important thing to note is
- 5:28:18that the 128,000 or any of those uh
- 5:28:21items on the sub first subtotal line
- 5:28:24represent the The Upfront costs that are
- 5:28:27required to to um to get these
- 5:28:30Technologies in place but uh there are
- 5:28:33simply other overhead costs that come
- 5:28:36along with them that have not been Iden
- 5:28:38ified here and what we the way we deal
- 5:28:41with that is by applying factors to uh
- 5:28:44to to estimate what we believe the
- 5:28:46overheads could be in other other
- 5:28:49dockets we've used 8.76% as this
- 5:28:52overhead and so this this time we use
- 5:28:55six um and so uh but this is uh our way
- 5:29:00of capturing these or identifying these
- 5:29:04costs but in testimony all that's been
- 5:29:07identif ified again shipping
- 5:29:11handling um sales tax job site
- 5:29:15delivery those were identified as cost
- 5:29:18being included as part of this
- 5:29:21Factor correct but I would say that I
- 5:29:24wouldn't view that list as exhaustive
- 5:29:26that there can be other overhead costs
- 5:29:29associated with with um activities as
- 5:29:33we're describing here sure that's what I
- 5:29:36assume the etet is for
- 5:29:38um but it says shipping handling so
- 5:29:43shipping is included in the quote and
- 5:29:45then
- 5:29:47potentially included in the 6% overhead
- 5:29:49but we don't know that because there's
- 5:29:51not an actual breakdown or cost
- 5:29:54analysis related to that 6% is that
- 5:29:57correct you're correct it's not broken
- 5:29:59out you're correct and just for
- 5:30:02clarification Central Link would also
- 5:30:03get Capital cost of the
- 5:30:0515% and profit on top of those
- 5:30:08potentially double counted shipping
- 5:30:12costs
- 5:30:14the the uh yeah the the math the the
- 5:30:18calculation for the capital cost comes
- 5:30:21from a line that includes the overhead
- 5:30:23so that that's how it's calculated
- 5:30:26correct and then the profit margin is is
- 5:30:29calculated off that similar amount so in
- 5:30:31the case of the generator it's the
- 5:30:33135,000
- 5:30:35amount okay
- 5:30:38and
- 5:30:39then with capital costs similarly
- 5:30:42Central Link applied a a
- 5:30:4415% annual estimate uh standard uh to
- 5:30:48all projects regardless of the details
- 5:30:52of the
- 5:30:53projects um yeah it's a it's a standard
- 5:30:56factor that we
- 5:30:58use and in um testimony Capital costs
- 5:31:04and I think it's um actually Des
- 5:31:07described up on the previous page on
- 5:31:09page two um Capital costs are described
- 5:31:12as carrying cost taxes depreciation
- 5:31:16Etc
- 5:31:18correct um and again Century Link didn't
- 5:31:20did not have any breakdown or conduct
- 5:31:22any actual detailed analysis for these
- 5:31:25costs for each individual
- 5:31:27project no we
- 5:31:31didn't and there was no regarding
- 5:31:35Capital cost and carrying costs there
- 5:31:37was no risk assessment done regarding
- 5:31:40cost recovery for these
- 5:31:44projects um not specific to cost
- 5:31:47recovery the the factors that we use are
- 5:31:51um a function of the analysis that our
- 5:31:53finance team does to get to that the
- 5:31:56factors that we use I'm I don't have the
- 5:31:58details of that so uh but I'm not aware
- 5:32:01of an risk
- 5:32:03analysis so did the did the finance team
- 5:32:06do a breakdown
- 5:32:08or an actual projection well uh
- 5:32:12generally speaking a factor like this um
- 5:32:16would be based on uh uh information that
- 5:32:20that comes from our finance
- 5:32:23team but again like the overhead cost
- 5:32:27this is just a estimate based on
- 5:32:30experience um not necessarily based on
- 5:32:34the actual project um it's it's not
- 5:32:37based on one specific project it's uh
- 5:32:40based on
- 5:32:42experience thank
- 5:32:44you um and then looking
- 5:32:49specifically at the ethernet
- 5:32:51upgrade
- 5:32:53project um right there
- 5:32:58in what is this one two three four
- 5:33:00fourth
- 5:33:02column uh has the bill cost has zero
- 5:33:05dollar for equipment costs
- 5:33:08uh meanwhile
- 5:33:10in exhibit hearing exhibit 101
- 5:33:13attachment sd1 C rev 2 which is kind of
- 5:33:18that
- 5:33:19broad broad um chart with the cost
- 5:33:24related to the ethernet upgrade um it
- 5:33:27lists cost for Capital Equipment in the
- 5:33:29non-recurring costs um so
- 5:33:33is the chart right we see here in sd4 is
- 5:33:37that is that
- 5:33:38incorrect no the the the chart's correct
- 5:33:42it's just uh you know it's an attempt to
- 5:33:45show a lot of data that where the the
- 5:33:48column for ethernet upgrade is a little
- 5:33:50unique from every other column so the
- 5:33:54when you look at the one 1, 760,000
- 5:33:58number it's a non-recurring cost and
- 5:34:01what's in that number are the is the
- 5:34:04cost of doing fiber builds it's the cost
- 5:34:06of equipment it's it's any non-recurring
- 5:34:09cost that's been identified either that
- 5:34:11Sentry Link would have to uh Implement
- 5:34:14in its Network or that the third party
- 5:34:17uh providers would have to implement the
- 5:34:19equipment costs for every other column
- 5:34:22there are the uh equipment costs that
- 5:34:24were identified specific to those
- 5:34:26projects so it's um it's an attempt to
- 5:34:30kind of put several pieces of
- 5:34:31information in the same
- 5:34:35chart okay not not really f following um
- 5:34:39so there are equipment costs but they're
- 5:34:40included in the build cost but they're
- 5:34:42not broken out into equipment
- 5:34:45cost so are we talking specifically the
- 5:34:48ethernet project correct in in this
- 5:34:51chart okay so
- 5:34:541.76
- 5:34:56million I understand that that that that
- 5:34:59amount includes the the total um I'm
- 5:35:02trying to understand what our build cost
- 5:35:05versus equipment cost when the other
- 5:35:07chart
- 5:35:08identifies equipment
- 5:35:11costs so um the information that
- 5:35:15distinguishes between equipment and
- 5:35:18outside plant costs is uh is in I think
- 5:35:23exhibit e or exhibit B I'm not sure the
- 5:35:27um the exactly the naming so um the the
- 5:35:31chart breaks down the costs um that are
- 5:35:35upfront costs for the building out the
- 5:35:38fiber and the up front cross for the
- 5:35:41equipment and both Total together to 1.7
- 5:35:48million and we can move move on for this
- 5:35:51but I think it's just that the doesn't
- 5:35:54appear that the this chart necessarily
- 5:35:57matches up with your other chart uh
- 5:36:00certainly in the total it does but um in
- 5:36:02the description of the cost which again
- 5:36:04this this chart we're looking at here
- 5:36:06this is intended to be your master
- 5:36:08chart regarding the breakdown of the
- 5:36:09cost correct okay
- 5:36:13correct
- 5:36:15um and the
- 5:36:19testimony didn't identify the types of
- 5:36:21equipment uh whether in this chart or in
- 5:36:25the confidential exhibit B that you were
- 5:36:27just referencing um or in general the
- 5:36:30testimony didn't identify the types of
- 5:36:32equipment they required for um the the
- 5:36:36projects
- 5:36:38um only in only in the categories that
- 5:36:43um if a fiber facility is going to be uh
- 5:36:47implemented a location the you have to
- 5:36:50have equipment that uh terminates that
- 5:36:52fiber so there's you would know that you
- 5:36:54would have that kind of equipment but
- 5:36:56the specific device itself no that's not
- 5:36:58been
- 5:37:01identified um
- 5:37:05and also in you're talking about the the
- 5:37:10project the ethernet upgrade project is
- 5:37:13going to require some Fiber Bild is that
- 5:37:14correct correct um and you we have some
- 5:37:19other projects that are fiber build
- 5:37:21projects and with those
- 5:37:23projects um cental link provided a
- 5:37:25costing
- 5:37:26tool that broke down the description of
- 5:37:30what went into the construction or
- 5:37:32what's proposed for the construction
- 5:37:34there's not a similar costing tool for
- 5:37:37the ethernet upgrade project as well
- 5:37:40right there there have been some cost
- 5:37:43per foot information provided for the
- 5:37:44ethernet project um the the screenshots
- 5:37:48of the costing tool itself no we've not
- 5:37:50provided
- 5:37:53those
- 5:37:56um and
- 5:37:58then additionally regarding the the
- 5:38:01build
- 5:38:02costs um I believe in in
- 5:38:05testimony I think you touched on it
- 5:38:09earlier um but the bill costs
- 5:38:13include costs related to ethernet
- 5:38:16conversion that's already started
- 5:38:17happening at certain locations is that
- 5:38:20correct right correct um so those costs
- 5:38:23have already been
- 5:38:25incurred um yeah to the extent that I I
- 5:38:29don't know where those six locations are
- 5:38:31in the kind of the sequence of time uh
- 5:38:36but um we' moved forward with those so
- 5:38:38yeah some cost would have been
- 5:38:40incurred but centry link has provided no
- 5:38:44invoice or other evidence of the costs
- 5:38:46that have already been spent on these
- 5:38:48projects not to my knowledge no but they
- 5:38:52are included here they're included in
- 5:38:56our overall
- 5:38:59project well we don't know what those
- 5:39:02are well the you you don't know what
- 5:39:06those are you
- 5:39:08yeah I I don't I I I know I can look at
- 5:39:11the the exhibit and see what the costs
- 5:39:15are per
- 5:39:16location uh um but I I don't have the
- 5:39:21the specific uh costing tool output of
- 5:39:25that well and even if you knew
- 5:39:28the particular locations you wouldn't
- 5:39:31know a distinguish from what's estimated
- 5:39:34going forward versus what's already been
- 5:39:35spent
- 5:39:37I don't know that
- 5:39:39correct um during your examination with
- 5:39:42Miss old me you indicated you were
- 5:39:43seeking cost associated with the
- 5:39:45management of diverse Last Mile
- 5:39:47connection as part of the
- 5:39:50plan I'm sorry could you say that
- 5:39:53again when you were talking with uh Miss
- 5:39:55old me um you had stated you were
- 5:39:59seeking cost recovery for cost
- 5:40:02associated with the management of the
- 5:40:05diverse Last Mile connection as part of
- 5:40:08the
- 5:40:09plan um
- 5:40:11yes I know those are ongoing or onetime
- 5:40:14costs those are
- 5:40:17ongoing um but again there's no
- 5:40:20breakdown of what those costs
- 5:40:25are the so the the the pricing for the
- 5:40:32the the sentury link provided locations
- 5:40:36in the ethernet bill
- 5:40:38um come from already existing contract
- 5:40:40pricing in Colorado so we're we're using
- 5:40:45um uh pricing for 10 Meg ethernet
- 5:40:48service that is um um has been available
- 5:40:52for a while and it's already been vetted
- 5:40:55the the price for uh the third party um
- 5:41:00providers in the ethernet project uh
- 5:41:04were the was the price from the third
- 5:41:06party with um the
- 5:41:0910.5 for the margin uh added to
- 5:41:15that but again these are ongoing costs
- 5:41:18and presumably they're going to go on
- 5:41:19longer than the two-year Improvement
- 5:41:21plan they will go on as long as we're
- 5:41:24providing service to the baps that they
- 5:41:26are on definitely ongoing
- 5:41:29costs but you're
- 5:41:33only you're seeking only to cover
- 5:41:37a year or two years of those costs so um
- 5:41:41the way I would look at it is when you
- 5:41:43look at the the NRC portion of the
- 5:41:46ethernet upgrade project the $1.7
- 5:41:48million of build we're seeking to get
- 5:41:51recovery of those costs those upfront
- 5:41:53costs over the the 12 month or 24 months
- 5:41:57whatever is provided but that's the NRC
- 5:42:00part that's The Upfront part the ongoing
- 5:42:02costs for the service itself we're
- 5:42:06asking to be recovered each month as
- 5:42:08long as we're providing the
- 5:42:11service so are the are the are the
- 5:42:15ongoing management cost of those those
- 5:42:17included exclusively in
- 5:42:20the
- 5:42:21MRC
- 5:42:24correct correct so I'll give you an
- 5:42:26example U within the cost uh of a
- 5:42:30service like 911 service in in col
- 5:42:33Colorado includes our netork Network
- 5:42:36operation group and so the the cost of
- 5:42:40of of of of of monitoring the network
- 5:42:43and then um responding if if an issue
- 5:42:46happens the the cost of upgrading the
- 5:42:49equipment we need over time uh there
- 5:42:52there's there there's several costs that
- 5:42:54are just simply ongoing when you deliver
- 5:42:57a service and that's what we've included
- 5:42:59in the MRC piece of the ethernet upgrade
- 5:43:04project thank you for that clarification
- 5:43:08um and specifically related to The Last
- 5:43:10Mile diversity um I'll call them
- 5:43:13projects projects within the project I
- 5:43:15guess um
- 5:43:18but the central leag proposes to lease
- 5:43:21access to other providers networks is
- 5:43:23that
- 5:43:24correct correct in in some situations to
- 5:43:27have that secondary path
- 5:43:30in and we had looked at the chart before
- 5:43:33that confidential exhibit B um again we
- 5:43:37don't need to pull it up I don't think
- 5:43:39um but that last column is the least
- 5:43:43costs
- 5:43:44for leasing from third parties is that
- 5:43:47correct that's
- 5:43:49correct it's the NRC well it's the NRC
- 5:43:52portion of it so correct the last column
- 5:43:54is the NRC portion of it correct the NRC
- 5:43:57thank you
- 5:43:58um and
- 5:44:00then um those lease costs get put into
- 5:44:04your total the total cost for the
- 5:44:07ethernet upgrade project um and then
- 5:44:10they're you're charging a 6% overhead on
- 5:44:15that
- 5:44:17Lee um is that
- 5:44:22correct uh no just the 10% 10.5%
- 5:44:28markup
- 5:44:30so and the non-recurring costs those as
- 5:44:34you just said those lease costs are
- 5:44:35added to the total which is reflected in
- 5:44:37this master chart that total is then the
- 5:44:426% is added on top of that so you're
- 5:44:45you're charging a overhead on the
- 5:44:48lease so um we are for the non-recurring
- 5:44:54the non-recurring charges we're charging
- 5:44:56that's all I'm talking about is
- 5:44:56non-recurring yeah yes we are charging
- 5:44:59the 6% for the non-recurring charges but
- 5:45:02there is a monthly recurring lease cost
- 5:45:06from comp
- 5:45:07from GTE to Lumen for the ongoing
- 5:45:12availability of the facilities that
- 5:45:14they're providing and uh to that cost
- 5:45:19we've applied the 10.5 margin factor
- 5:45:22to well the 10.5 is also applied to the
- 5:45:26lease
- 5:45:29cost um well and that's on top of the
- 5:45:33overhead that's being charged let's
- 5:45:35let's just go back to
- 5:45:37the
- 5:45:38overhead so we're talking about lease
- 5:45:41and there's no shipping and handling
- 5:45:43costs on a lease is
- 5:45:45there so uh uh there can be there can be
- 5:45:51if there's equipment that's has to be
- 5:45:53shipped on site to do some activity um
- 5:45:57as we said before we didn't study the
- 5:46:00specific overhead cost to this specific
- 5:46:03proposal what we what we've identified
- 5:46:06is historically we know there's going to
- 5:46:08be overhead costs and so we have factors
- 5:46:12that we use to calculate those overhead
- 5:46:14costs so we can use them in in
- 5:46:17calculations like
- 5:46:19this but there has been no
- 5:46:21identification of what the actual
- 5:46:22overhead cost are for a lease just a
- 5:46:26lease to
- 5:46:28access the um third party providers so
- 5:46:33um I think the way to look at this is
- 5:46:36there's a por
- 5:46:37of of delivering the service to the psap
- 5:46:40there's a portion that GTE provides
- 5:46:44we're leasing the fiber from them and we
- 5:46:48pay them for that um but we're also
- 5:46:51providing the service of ethernet across
- 5:46:54that connection so there are going to be
- 5:46:56overhead
- 5:46:58charges that um uh we're going to incur
- 5:47:01and and and they can they can be uh
- 5:47:05different charges in different
- 5:47:07situations but but we're going to incur
- 5:47:09those okay but the amount that the
- 5:47:12overhead is getting charged using to
- 5:47:15determine and being charged against is
- 5:47:18the least just the lease cost straight
- 5:47:22lease here's how much you're paying to
- 5:47:24get access to the fiber so just as a
- 5:47:27matter of clarification when you say
- 5:47:29lease cost do you mean the monthly
- 5:47:30recurring lease cost or The Upfront
- 5:47:33nonrecurring cost we're going to have to
- 5:47:35pay because I only talking about
- 5:47:37non-recurring okay so we yes we've
- 5:47:40applied a 6% factor to that
- 5:47:42non-recurring cost and again you
- 5:47:47have this and what we're talking about
- 5:47:49the lease cost this is the cost paying
- 5:47:52just like you pay rent or anywhere else
- 5:47:55to lease you are just paying an amount
- 5:47:58to access get access to that fiber so
- 5:48:01this is It's the cost of the
- 5:48:03construction that we're paying uh G
- 5:48:07to if if there is a construction cost
- 5:48:10and there isn't always a construction
- 5:48:12cost it's the cost of the equipment that
- 5:48:15they'll have to put on premise um um and
- 5:48:20yeah we're we're applying a 6% factor to
- 5:48:23that okay so so you're suggesting that
- 5:48:26shipping and handling sales tax none of
- 5:48:28that's included
- 5:48:30in the lease
- 5:48:33cost um or you just don't know don't
- 5:48:37know I I I don't know that's why we use
- 5:48:38a factor because we have to use a factor
- 5:48:41to estimate what we think the cost will
- 5:48:43be well there's just been no breakdown
- 5:48:44or actual analysis of these costs at all
- 5:48:48not specific to these projects sure
- 5:48:51correct okay
- 5:48:54um and
- 5:48:58so give me a second your honor
- 5:49:12I think that's all the questions I have
- 5:49:14thank
- 5:49:19you all right okay we got about 12
- 5:49:22minutes I'm gonna ask you some questions
- 5:49:23Mr Carlson because I got to take a break
- 5:49:25at 3:30 and so you're G about 12 minutes
- 5:49:28of questions maybe maybe less okay okay
- 5:49:33uh M old was talked about the concur
- 5:49:36sessions and uh and the 600 versus 620
- 5:49:40why are we using the 600 as opposed to
- 5:49:43the 620 since that's a more recent
- 5:49:45number that's been used by company so um
- 5:49:49so if we look at each each uh situation
- 5:49:52separately so the the the concurrent
- 5:49:56sessions of 600 that we're recommending
- 5:49:59is for the the monthly recurring charge
- 5:50:02for the ethernet project and it's a
- 5:50:06charge that will continue on um it'll be
- 5:50:11year three year four year five and so it
- 5:50:14will it will function exactly like the
- 5:50:16charge we are already have in place for
- 5:50:18the EET which is the net a network and
- 5:50:21the charge that we have already in place
- 5:50:24for uh a solution that we provide called
- 5:50:26ecaps which is an analytic solution they
- 5:50:29will all use 600 it'll be a common
- 5:50:32denominator that if in the future there
- 5:50:35is a a rebalancing of the rate uh we
- 5:50:38have all the services that are providing
- 5:50:40to to 911 operating with a with a common
- 5:50:45um a a a concurrent session count so
- 5:50:49that's the MRC for the ethernet project
- 5:50:52for the build projects it's a fixed
- 5:50:55duration it's we're recommending 12
- 5:50:57months it could be two years it could be
- 5:50:59something else but it's a fixed duration
- 5:51:02so not subject to rebalancing over time
- 5:51:05so in that case
- 5:51:07the recommendation was to use 623 which
- 5:51:09is the actual count at this point so
- 5:51:12that's the logic behind two
- 5:51:15different um U uh factors didn't you
- 5:51:20just use 620 for both or 623 for both of
- 5:51:23them to keep to keep them I mean your
- 5:51:27logic seemed to be that we want to keep
- 5:51:28them all the same on the first one I
- 5:51:29mean you could keep them all the same if
- 5:51:31it was 623 too couldn't you I mean well
- 5:51:34it depends on which problem you want to
- 5:51:36solve for so uh you know but so we we're
- 5:51:40choosing to solve the problem of let's
- 5:51:42keep it consistent with what we already
- 5:51:44have out there all right uh hey Miss
- 5:51:47Federico could you uh get that last
- 5:51:49chart up there that I'm sure Mr
- 5:51:51Carlson's just enjoyed looking at all
- 5:51:53day uh uh is that
- 5:51:57sd4 some yeah with the with the 12 month
- 5:52:00or 12 or 24 month um
- 5:52:05breakdown uh Mr Cox which one did you
- 5:52:07have up there I like that one I couldn't
- 5:52:09I was trying to remember it yes hearing
- 5:52:12is up at 10 one1 attachment std4 yeah
- 5:52:16okay that's good is this the right page
- 5:52:20yeah that work that's fine um
- 5:52:24so I got tell you Mr Carlson the one
- 5:52:27thing I've heard people asked and and Mr
- 5:52:30Cox was all over the second go as his
- 5:52:32overhead costs and I got tell you what
- 5:52:34you've done a marvelous job of t dancing
- 5:52:37and word salads on what actually falls
- 5:52:39into that overhead cost and I want to
- 5:52:41congratulate you on that but I want to
- 5:52:42know something sometimes it's
- 5:52:43engineering cost sometimes it's not
- 5:52:45engineering cost sometimes it's shipping
- 5:52:47cost sometimes it's not what actually is
- 5:52:49in that
- 5:52:50Barrel so um I can give you examples of
- 5:52:54that um I want to know what's in the
- 5:52:56barrel I want to know exactly what's in
- 5:52:58that
- 5:52:59Barrel um and and if I had that
- 5:53:01information I would I would give it to
- 5:53:03you um I I would tell you that we
- 5:53:06haven't we've done a study to to
- 5:53:09understand what the build costs are
- 5:53:11we've done a study to figure out what
- 5:53:12the equipment costs are and we have
- 5:53:15quotes and models that factor in all the
- 5:53:18things that you need to know in order to
- 5:53:20get to those amounts but we don't have a
- 5:53:23way of knowing exactly what the overhead
- 5:53:26costs are going to be for a particular
- 5:53:29project and the only option we have is
- 5:53:32to use a historic factor to estimate it
- 5:53:35and that's a that that's what we've done
- 5:53:37here yeah but but here's my problem with
- 5:53:39that is I just kind of want to know what
- 5:53:40historically if you're looking at it
- 5:53:42historically you should historically
- 5:53:43know what goes into those things and so
- 5:53:46you should be able to to to spit out
- 5:53:48this goes in that goes in that doesn't
- 5:53:50go in um because that's how you find
- 5:53:53that out that's how I mean if you
- 5:53:54historically know it comes out to this
- 5:53:56percentage you historically must know
- 5:53:58what goes in there shouldn't you uh you
- 5:54:00know what I think that's a fair question
- 5:54:02and um I I just I just don't have that
- 5:54:05information of aable to me okay let me
- 5:54:08ask you this one and this is one thing
- 5:54:09you mentioned a couple times here and I
- 5:54:10think you think it's a good point but it
- 5:54:12doesn't it doesn't work for me as a good
- 5:54:13point is you said hey you know what
- 5:54:15we're using that 6% overhead you know in
- 5:54:18other cases we used
- 5:54:198.75 well you know what that tells me
- 5:54:21when you say I mean I think you're
- 5:54:22telling me that to say listen we're
- 5:54:24really cutting you a good deal here but
- 5:54:26what that makes it sound to me like is
- 5:54:28you're just making it up why don't you
- 5:54:29cut us a better deal and make it
- 5:54:32three I mean why is that I mean how does
- 5:54:35that that that that that's the way that
- 5:54:37came across to me I mean why was the 1
- 5:54:391875 because you've historically looked
- 5:54:41at this stuff right um you know I don't
- 5:54:45have a good answer for you on that to be
- 5:54:47honest I mean I think that um if I was
- 5:54:50to go back a couple of weeks and and and
- 5:54:53be a part of the conversation then the
- 5:54:55factor would have been
- 5:54:568.76 so uh that's the factor that was
- 5:54:59chosen to use at this time so that's a
- 5:55:01factor we're going to use but I
- 5:55:03appreciate what you're saying I I think
- 5:55:05if if I could take 6% and break it down
- 5:55:08into all the subp parts relevant to
- 5:55:10these projects then we would have
- 5:55:12complete Clarity here so I uh I I
- 5:55:15appreciate the question that you're
- 5:55:17asking and let me ask you this one I I
- 5:55:19mean when I look at that again I look at
- 5:55:21the Burlington Lamar equipment project
- 5:55:23well we've got no build
- 5:55:25costs and I look at the one right next
- 5:55:28to it the cida Howard fiber project and
- 5:55:30we've got
- 5:55:3263766 4,000 in build costs yet our
- 5:55:36overhead percentage wise is exactly the
- 5:55:40same I mean is there no differentiation
- 5:55:42between the projects whether there's a
- 5:55:44build cost or not it's just I mean it
- 5:55:48just seems like a number you're throwing
- 5:55:49at me why is that not why is there not a
- 5:55:50difference on that you know I I I think
- 5:55:53in reality there certainly could be a
- 5:55:55difference in specific overheads related
- 5:55:58to the Bild cost which is really fiber
- 5:56:01it's the the fiber piece of it uh and
- 5:56:03then the equipment which is the optical
- 5:56:05electronic
- 5:56:07um there there probably would be um more
- 5:56:11more um um overheads or related to the
- 5:56:14equipment cost be that theoretically but
- 5:56:17we just we don't have a factor that
- 5:56:19splits It Out by type of of cost and so
- 5:56:22we end up having a an aggregate factor
- 5:56:25that we apply to the totals like we did
- 5:56:28here well but when I look at the law
- 5:56:30that I have or the rule that I have to
- 5:56:31to to follow here you're supposed to
- 5:56:33provide a firm estimated cost
- 5:56:36now you know I mean again I would just
- 5:56:39assume that if there's no build costs in
- 5:56:41something and there is build costs in
- 5:56:43another one which is over a half a
- 5:56:45million dollars that the overhead would
- 5:56:47probably be greater in the other one um
- 5:56:51and so is that firm that or is that just
- 5:56:53throwing a number on
- 5:56:55it um you know I I'm not I'm not being
- 5:56:59flippant here sir I I'm not sure the
- 5:57:01definition of firm so so what I would
- 5:57:04say is we have to provide our best um
- 5:57:09solid um estimate of what the costs are
- 5:57:12with the with the factors that we
- 5:57:14typically use um I I do would not expect
- 5:57:18you know we're certainly not
- 5:57:20anticipating it you know the overheads
- 5:57:23um going more than that and and not
- 5:57:25anticipating um you know coming back at
- 5:57:28you know and saying well let's revisit
- 5:57:30that okay well and again don't don't
- 5:57:32worry about being flipping on that I
- 5:57:34don't know what it means either yeah uh
- 5:57:36I mean that's that's what I got to
- 5:57:37figure out and that's what um why I'm
- 5:57:39trying to figure out whether you whether
- 5:57:41you think that's firm if there's that
- 5:57:43difference in there uh between the
- 5:57:46projects uh the next one I want to ask
- 5:57:48you about on this is the capital costs
- 5:57:51and again it just seems odd to me that
- 5:57:54the capital costs in year one and year
- 5:57:56two would be exactly the same wouldn't
- 5:58:00there be a lesser Capital cost in year
- 5:58:03two well um not not necessarily um I I
- 5:58:08mean I guess the the idea of of this
- 5:58:13information here is to is to recognize
- 5:58:15that um you know costs will start
- 5:58:18getting incurred as as we U spend
- 5:58:21capital on these projects and um we
- 5:58:24don't know the the exact timing of of
- 5:58:28when the projects are going to start I
- 5:58:30mean we're recommending as soon as
- 5:58:31possible um but um the factor that we've
- 5:58:35received to apply against the the um the
- 5:58:38capital
- 5:58:39investment um is um you know what you
- 5:58:42see here and um you know our
- 5:58:45calculations just use those factors um
- 5:58:47you know in both years so if we I'm
- 5:58:51sorry again again I mean trust me I'm
- 5:58:54about as lazy as it gets but that kind
- 5:58:56of looks lazy to me to use that same 15%
- 5:58:59I've got to think it's got to be a
- 5:59:00decreased Capital cost in year two um
- 5:59:05and again that's fine to to put that in
- 5:59:07there but these are the numbers that are
- 5:59:08going to be used to determine uh what
- 5:59:11costs that rate payers are going to pay
- 5:59:13and um you know when it's an obvious one
- 5:59:16to me I just kind of question why it's
- 5:59:18not why it's not lower but what what's
- 5:59:21the rationel behind
- 5:59:23it um I guess the rationale would be
- 5:59:26that you know we're just applying the
- 5:59:28same factor in both years this is for
- 5:59:30two years if we you know obviously if we
- 5:59:33uh recover the cost in one year then
- 5:59:36uh there's only only one one year
- 5:59:40applied but wouldn't you but you don't
- 5:59:43wouldn't you agree that the capital
- 5:59:45costs are more than likely going to be
- 5:59:46less in year two if it goes to a
- 5:59:49two-year I I I think that's I think
- 5:59:51that's potential and I I think there's a
- 5:59:54potential for that that they could be
- 5:59:55different um it just you know the way we
- 5:59:59would understand the difference would be
- 6:00:01by going through kind of a
- 6:00:02month-by-month calculation of when the
- 6:00:05capital spend happened and and uh you
- 6:00:08know what the tax implications are and
- 6:00:11you know the other pieces that go into
- 6:00:12that factor but yeah I I I I understand
- 6:00:16what you're
- 6:00:17saying okay um and I told you I would be
- 6:00:20done and I think 12 minutes and I think
- 6:00:23I have like about 30 seconds left and
- 6:00:25there it goes uh we will take a 15
- 6:00:28minute break and uh then Mr Carlson
- 6:00:32apart from redirect you're going to be
- 6:00:34done we'll be back in 15 to
- 6:00:37345 sounds
- 6:01:04good
- 6:01:34e
- 6:02:04e
- 6:02:34e
- 6:03:04e
- 6:03:34e
- 6:04:04e
- 6:04:34e
- 6:05:04e
- 6:05:34e
- 6:06:04e
- 6:06:34e
- 6:07:04e
- 6:07:34e
- 6:08:04e
- 6:08:34e
- 6:09:04e
- 6:09:34e
- 6:10:04e
- 6:10:34e
- 6:11:04e
- 6:11:34e
- 6:12:04e
- 6:12:34e
- 6:13:04e
- 6:13:34e
- 6:14:04e
- 6:14:34e e
- 6:15:30all right
- 6:15:35Tracy you hear
- 6:15:38me I can hear you all
- 6:15:41righty uh we shall go back on the record
- 6:15:44with proceeding 23 a-01
- 6:15:47197t and Mr Carlson I am quite sure you
- 6:15:50remember this but you're still on the
- 6:15:51record or you're still under oath Excuse
- 6:15:53me yes sir right and so now is there any
- 6:15:58redirect uh there is your honor um I
- 6:16:01just want on redirect I think I just
- 6:16:02want to do two things just for Shadow
- 6:16:05I'm going to ask Mr um Carlson to talk a
- 6:16:08little bit about the monthly recurring
- 6:16:09charge associated with the uh ethernet
- 6:16:13upgrade and then I'm going to show him
- 6:16:15some uh cost support documents for uh
- 6:16:19the E ethernet um um project as well
- 6:16:23just to have him verify them uh because
- 6:16:25they were
- 6:16:26not submitted as attachments um so those
- 6:16:30are the two things I'm planning on doing
- 6:16:32so if I could start first uh Miss fedo
- 6:16:36if you could pull up exhibit 110
- 6:16:51again thank
- 6:16:53you all right
- 6:16:56um Mr Carlson you would uh I think
- 6:17:00received some questions from M older
- 6:17:02concerning uh this document and uh the
- 6:17:06uh the purpose of it and and the charge
- 6:17:08that would uh come as a result you
- 6:17:10recall that yes I do okay and just to
- 6:17:13set the background for some of these
- 6:17:14questions can you just remind everybody
- 6:17:17uh what this document is um so this
- 6:17:20document shows uh the calculation for
- 6:17:23the monthly recurring rate element for
- 6:17:27the the the ethernet project okay and
- 6:17:32this is for um is this what C are you
- 6:17:35seeking to recovery here so it's it's
- 6:17:38the ongoing costs that are um uh uh are
- 6:17:43incurred by offering ethernet uh
- 6:17:46services in uh to these P apps and and
- 6:17:51the cost not only the cost that uh
- 6:17:54Sentry Link incurs on a monthly
- 6:17:56recurring basis internally but also uh
- 6:18:00costs that we pay to the third party
- 6:18:02vendors who are providing the underlying
- 6:18:04access okay and I think in connection
- 6:18:07with Mr Cox's questions you'd identified
- 6:18:09those underlying providers as being
- 6:18:11either Comcast or gt is that right
- 6:18:13that's correct okay um so and just to
- 6:18:16reiterate you there Comcast and GT T
- 6:18:20also charge have is it GT or GTE gtt
- 6:18:24okay all right make sure I get that
- 6:18:25straight also has a non-recurring uh
- 6:18:27element to it to the charges as well is
- 6:18:29that right it does and can you explain a
- 6:18:31little bit what the what the
- 6:18:32non-recurring charges are for versus
- 6:18:33what the recurring charges are for so
- 6:18:35the non-recurring charges um for the
- 6:18:39thirdparty providers are basically two
- 6:18:41parts if they have to uh build their
- 6:18:44fiber out to a piece application then
- 6:18:47there's a non-recurring charge for that
- 6:18:49uh and then there's a non-recurring
- 6:18:51charge for the equipment that is has to
- 6:18:54be purchased at the um at the site for
- 6:18:57the build so um but those are upfront in
- 6:19:00nature they're not recurring in nature
- 6:19:02that's why they're called non-recurring
- 6:19:04CHS okay and is it accurate to say all
- 6:19:06the costs for those non-recurring
- 6:19:07charges are included in that $1.7
- 6:19:10million figure you had for uh for the
- 6:19:12ethernet that's correct okay and in that
- 6:19:14$1.7 million are are the Sentry Link
- 6:19:17charges that or costs I'm sorry that
- 6:19:19it's going to incur for building also
- 6:19:21included correct okay correct and so
- 6:19:23what we're looking at right now are
- 6:19:25recurring charges is that right exactly
- 6:19:28and this is for the product correct and
- 6:19:30and that product is going to be ethernet
- 6:19:32essentially that's correct and and these
- 6:19:34costs that are reflected here in
- 6:19:35provisioning the product are a
- 6:19:37combination of both the charges that you
- 6:19:39receive from third parties and the
- 6:19:42charges that when they have the when
- 6:19:44they provide the access and then they're
- 6:19:46also charges that Sentry Link or cost
- 6:19:49centry link incurs providing the project
- 6:19:51itself right that's correct now these
- 6:19:55are you aware of the fact I think this
- 6:19:56was mentioned by Miss old that staff um
- 6:19:59opposes the inclusion of these costs yes
- 6:20:03I'm aware of that okay and is it
- 6:20:05understanding that they take the
- 6:20:05position that it's not necessarily that
- 6:20:08these costs are inappropriate it's just
- 6:20:10inappropriate to award in this doc
- 6:20:12that's my understanding okay and and can
- 6:20:16you explain a little bit about what your
- 6:20:18what your response is to that um yeah so
- 6:20:21um given the recurring nature of of
- 6:20:24these costs the only way for Lumen to
- 6:20:27provide that ethernet service the only
- 6:20:29way for Lumen to U uh enable the peaps
- 6:20:33to have the future Uh current and and
- 6:20:36future capabilities that ethernet brings
- 6:20:40uh is we have to have our costs recurred
- 6:20:42on a monthly per recurring basis for as
- 6:20:45long as we're providing service which
- 6:20:46could be you know for however long we're
- 6:20:49the bsp and the the 911 provider in the
- 6:20:52state so if we don't uh receive uh
- 6:20:56recovery of those costs going forward
- 6:20:57then we can't provide the
- 6:20:59service and and so I mean are you you
- 6:21:02feel like you're in a situation where if
- 6:21:05you don't get these costs approved now
- 6:21:08uh and and you later don't have your
- 6:21:10tariff approved you're in a situation
- 6:21:12where you've incur the non-recurring
- 6:21:13charges pass those to the raid payers
- 6:21:15and that's and then can't provide the
- 6:21:17service um I I think you have to look at
- 6:21:20both of them together that um the the
- 6:21:24way the the information is has been
- 6:21:27identified is to provide the the service
- 6:21:30that we were talking about here ethernet
- 6:21:32provided in a diverse way you you have
- 6:21:34to have the certain amount of
- 6:21:36non-recurring charges to enable that but
- 6:21:38then you need to have the month
- 6:21:39recurring charges you you have to have
- 6:21:41them
- 6:21:42both and and do you have a Viewpoint if
- 6:21:45if uh if if the court were or the
- 6:21:48commission were to agree with staff's
- 6:21:50position that includ approving this uh
- 6:21:54monthly
- 6:21:55recurring rate in the Tariff was beyond
- 6:21:58the scope of this proceeding but the
- 6:22:01commission nevertheless approved the the
- 6:22:04cost Rec recovery for non-recurring
- 6:22:05charges what would what would centry
- 6:22:07link
- 6:22:08do um you know I think we would have to
- 6:22:11evaluate the whole the whole proposal
- 6:22:14and and look at it from um um you know a
- 6:22:19different perspective and and and and
- 6:22:21see if if if if we're stranding
- 6:22:24investment out there in the
- 6:22:25non-recurring by not having the the
- 6:22:27service cost taken care of on the month
- 6:22:29of recurring side
- 6:22:32okay I'm G to move off the the monthly
- 6:22:35recurring charts then um I'm going to at
- 6:22:40this point show I've been asked to show
- 6:22:42the witness some uh confidential
- 6:22:45documents I believe all the all the
- 6:22:47remainder part of his testimony will be
- 6:22:49confidential because I'll be going back
- 6:22:50and forth between confidential documents
- 6:22:53so if I could ask to have those
- 6:22:55procedures put in place yeah just give
- 6:22:58me a few
- 6:23:01minutes before whether we're going out
- 6:23:03of confidential then I I was really good
- 6:23:05about it too proud of myself and then I
- 6:23:08forgot once it was
- 6:23:23obvious all right we're all set okay I'm
- 6:23:26not miss SC I'm not gonna have you get
- 6:23:27reentered in there I don't think we're
- 6:23:29too far into your testimony that your
- 6:23:31testimony has been admitted into the
- 6:23:33record here so uh you may
- 6:23:37continue um and Miss C I think you were
- 6:23:39saying that you don't recall exactly how
- 6:23:41many of those uh meetings were held is
- 6:23:44that right that's correct okay is if
- 6:23:48I in Mr Do's testimony it said that
- 6:23:51there were at least nine is that
- 6:23:52consistent with your
- 6:23:54recollection that sounds
- 6:23:58right um and uh at during those meetings
- 6:24:02you had the opportunity to uh present uh
- 6:24:06any ideas uh for of Le for creating uh
- 6:24:10Network improvements isn't that correct
- 6:24:13that's not how I recall the meetings
- 6:24:15were
- 6:24:15held so you you do you not agree that
- 6:24:19you did do you believe you did not have
- 6:24:20the opportunity to present your own uh
- 6:24:23or Lita's
- 6:24:25proposals that's correct okay and and
- 6:24:28what stopped Lita from providing its own
- 6:24:30proposals during those meetings centry
- 6:24:32link came forward with their ideas of
- 6:24:35projects and presented those to
- 6:24:39stakeholders and and L presented none
- 6:24:42correct that's correct centry link
- 6:24:44presented the
- 6:24:46projects um I want to uh uh take you to
- 6:24:52um the first opinion uh that you
- 6:24:55expressed uh in your testimony and uh
- 6:24:58just for the record I'm referring to um
- 6:25:01hearing exhibit uh 600
- 6:25:06uh opinion number one which is on page
- 6:25:1012
- 6:25:13um and uh just remind you what that
- 6:25:16opinion was I'll just read it quickly
- 6:25:17and then ask you oh well we can do it
- 6:25:20together excellent thank
- 6:25:23you it
- 6:25:27uh says uh when the intended purpose of
- 6:25:30a project is to create a secondary path
- 6:25:32for 911 calls third party facilities
- 6:25:35should be fully and fairly vetted as
- 6:25:37alternatives to the proposed new middle
- 6:25:40mile fiper builds given the potential
- 6:25:42benefits such as reduction in cost and
- 6:25:45shorten timeline to implementation do
- 6:25:47you see that I do okay is it your
- 6:25:50opinion that um Sentry Link in this
- 6:25:54docket would be eligible to recover uh
- 6:25:58leasing costs from third parties for
- 6:26:01facilities that go beyond two years
- 6:26:14I think it
- 6:26:17depends and can you give us some of the
- 6:26:19factors that you think it may depend on
- 6:26:22so from a if there is a opportunity to
- 6:26:27share lease infrastructure there may not
- 6:26:30be a cost so I think it depends it's
- 6:26:33hard to just give a blanket statement to
- 6:26:35say that any cost recovery of a lease is
- 6:26:38fair there could be a lot of
- 6:26:40arrangements that would that should be
- 6:26:43fully
- 6:26:45vetted um I don't have any further
- 6:26:51questions all right um and I just got I
- 6:26:54just got maybe five be real simple um
- 6:26:59the how the Howard fiber build it's slid
- 6:27:03it should that be should I approve that
- 6:27:05or should I not approve
- 6:27:07that I do not believe sir that you
- 6:27:10should approve that okay Central City
- 6:27:12fiber build should I approve that or not
- 6:27:14approve
- 6:27:15that I also believe that that should be
- 6:27:18denied uh Lamar Electronics middle mile
- 6:27:21diversity approve or not approve as
- 6:27:24presented I believe that should be
- 6:27:25denied portable generator fuel trailer
- 6:27:28approve or not approve I believe that
- 6:27:30should be denied ethernet upgrade with
- 6:27:33Last Mile diversity
- 6:27:34approve or not approve it is my opinion
- 6:27:36that should be denied do you think it's
- 6:27:39better to do you think that the 911
- 6:27:41system in Colorado will be better off if
- 6:27:43these are not
- 6:27:45approved as presented by Sentry Link and
- 6:27:48the convoluted pricing that we have been
- 6:27:52presented with and the information
- 6:27:54presented on the middle mile fiber build
- 6:27:56or lack thereof I believe Colorado would
- 6:27:59be better off at this time not approving
- 6:28:02these projects to allow the stakeholders
- 6:28:05to fully vet
- 6:28:07them if this delays these projects going
- 6:28:10into place Say by five years is that a
- 6:28:13good thing bad
- 6:28:17thing from a a blanket statement um I do
- 6:28:21believe that backup power is critical
- 6:28:25but I do not believe that cost should be
- 6:28:27bared by
- 6:28:289911 so there's I mean there's a lot of
- 6:28:31different pieces as it pertains to these
- 6:28:33projects that I think could strengthen
- 6:28:35an infrastructure like having a
- 6:28:37generator but that is a cost that I
- 6:28:39believe centry link should have to fund
- 6:28:41and not the 911
- 6:28:42Community but if it's a critical need
- 6:28:45doesn't it need to be done as quickly as
- 6:28:48possible if it's a critical need that
- 6:28:51should bear the cost of 911 perhaps but
- 6:28:54I think we need to be able to fully vet
- 6:28:56and understand the cost to understand if
- 6:28:59911 should pay 100% of cost for a
- 6:29:02for-profit company
- 6:29:05how much time do we have to take to
- 6:29:07figure that out for a critical need or
- 6:29:09what's what's the most amount of time we
- 6:29:11can take to figure that out for a
- 6:29:13critical
- 6:29:16need your honor I think that is a
- 6:29:19critical question and it's one that I'm
- 6:29:20faced with in 911 all the time we have
- 6:29:23risks we have to accept risk we have to
- 6:29:25mitigate risks and we have to understand
- 6:29:27where we're putting our crucial efforts
- 6:29:30and in this case I believe that the 911
- 6:29:33Community and specifically the EET users
- 6:29:35group should come in partnership with
- 6:29:38Sentry Link to identify projects in a
- 6:29:41timeline a reasonable timeline and bring
- 6:29:44critical Partners to the table to
- 6:29:46research
- 6:29:47Solutions so that may take 6 months 12
- 6:29:50months 18 months but as we build on the
- 6:29:54Tariff and we have this critical cost we
- 6:29:56have to be fiscally responsible and do
- 6:29:58our due diligence and most importantly
- 6:30:01make sure we're fixing the problem we
- 6:30:03may say we have middle mile fiber but as
- 6:30:05we've heard today it may all DeMark at
- 6:30:08the same physical location so we still
- 6:30:10have single points of failure so if we
- 6:30:12really want to improve and fix the
- 6:30:15infrastructure we need to understand
- 6:30:17truly what we're fixing the
- 6:30:19infrastructure we're fixing and make
- 6:30:20sure we're spending good money and not
- 6:30:22wasting that precious resource of our
- 6:30:25community you know and and that's the
- 6:30:27problem I have is that I have to figure
- 6:30:29out that that balance there because if
- 6:30:31you delay projects like this so we
- 6:30:33delaying
- 6:30:34um or do we have failures that happen
- 6:30:36and and then 911 service is not there
- 6:30:39when necessary and um it's it's a
- 6:30:43difficult decision thank you um any
- 6:30:49redirect I do your honor just briefly I
- 6:30:52want to go back um m c to the questions
- 6:30:57about uh critical need did there come a
- 6:31:02time where you in your role as a
- 6:31:06professional actually put in writing
- 6:31:09your
- 6:31:10requests that would go to centry link
- 6:31:14and were sent to centry link for
- 6:31:16purposes of developing the 2024
- 6:31:18Improvement plan
- 6:31:25content extensively yes and we submitted
- 6:31:29a document and I believe that document
- 6:31:31is on file
- 6:31:34and when you say we are you referring to
- 6:31:36whom I'm sorry
- 6:31:39Lita um did ccoa well do you know what
- 6:31:41ccoa is yes ccoa is Colorado Council of
- 6:31:45authorities and are you involved in that
- 6:31:48agency I am I'm the chair and to your
- 6:31:51knowledge did ccoa ever provide a
- 6:31:54document titled ccoa
- 6:31:56input yes ccoa did and that was on
- 6:31:59behalf of the ccoa members which I
- 6:32:02believe at the time we had 21 members I
- 6:32:06think we have 22 now but at the time we
- 6:32:08submitted that document it did reflect
- 6:32:10all of our members that were present and
- 6:32:13was that um something submitted to
- 6:32:15Century Link in the fall of 2023 yes it
- 6:32:18was and was that expressing what the
- 6:32:21governing bodies that you identified the
- 6:32:2321 governing bodies who are members of
- 6:32:25ccoa identified as critical needs for
- 6:32:28improving the basic emergency service
- 6:32:30network in Colorado yes that was the
- 6:32:33purpose of the
- 6:32:35document no further
- 6:32:38questions all right Miss cup thank you
- 6:32:40very much you may go about your rest of
- 6:32:43your day thank you for I don't know how
- 6:32:44long you're waiting around but I do
- 6:32:46appreciate you waiting I do appreciate
- 6:32:48your testimony very much thank you your
- 6:32:50honor okay ccoa may call its
- 6:32:54witness um at this time we would call
- 6:32:57Andrew
- 6:33:00Damron Damron raise your right hand for
- 6:33:02me you swear AFF firm tell the whole
- 6:33:04truth nothing but the truth under
- 6:33:05penalty of perjury I do all right go
- 6:33:09right ahead Miss old good afternoon Mr
- 6:33:11Damron could you please State your full
- 6:33:14name and spell your last name for the
- 6:33:15record Andrew Damron d m r o n and uh
- 6:33:21are you currently employed sir yes I am
- 6:33:24where are you employed the City and
- 6:33:26County of
- 6:33:27Denver and um do you have a title I do
- 6:33:30director of Denver 911 did you partici
- 6:33:33ipate in written developing written
- 6:33:36testimony for the Colorado Council of
- 6:33:38authorities Inc I did for purposes of
- 6:33:41this Improvement plan proceeding I did
- 6:33:45we would offer hearing exhibit
- 6:33:51700 any objection to
- 6:33:53700 hearing none 700 shall be
- 6:33:58admitted um if you could please pull up
- 6:34:07attachment
- 6:34:09ad3 to hearing exit at
- 6:34:24700 um Mr Damron were you online when um
- 6:34:28Mrs cul testified on behalf of Lita yes
- 6:34:31I was and did you he hear her refer to a
- 6:34:34document um ccoa sent to centry link in
- 6:34:37the fall of 2023 yes I did is attachment
- 6:34:41ad3 that document I believe so
- 6:34:48yes with respect to um attachment
- 6:34:57[Music]
- 6:34:58ad2 are you asking that one to be pulled
- 6:35:00up yes please I'm sorry
- 6:35:19this is a a exhibit entitled voice of
- 6:35:22Colorado Council of authorities Inc in
- 6:35:25proceeding number
- 6:35:2723-197 T are you familiar with that yes
- 6:35:30I am does that Express the requests of
- 6:35:3520 governing bodies in Colorado as to
- 6:35:39the projects that are proposed at an
- 6:35:41issue in this case yes it does I don't
- 6:35:44have any further
- 6:35:48questions all right any
- 6:35:53cross-examination yes thank you uh good
- 6:35:57afternoon Mr D how are you doing well
- 6:35:59thank you good good um
- 6:36:04uh M uh Federico if you don't mind
- 6:36:06pulling up uh again attachment ad3 to uh
- 6:36:10exhibit
- 6:36:17700
- 6:36:19um Mr Dam this is a this is an
- 6:36:21attachment to your testimony correct yes
- 6:36:25it was all right it's called the input
- 6:36:27of Colorado Council of authorities is
- 6:36:29that correct yes it is okay um
- 6:36:34um what projects or proposals are
- 6:36:38included uh in this document for uh
- 6:36:41sentury link to consider in connection
- 6:36:43with the network Improvement
- 6:37:01plan well again uh um to uh Echo someone
- 6:37:06previously not to be fit but I guess it
- 6:37:08depends on your definition of a project
- 6:37:10this document
- 6:37:12requests um assessment of the network as
- 6:37:16it exists including a comprehensive
- 6:37:19accounting for all single points of
- 6:37:20failure I would uh Cate if you
- 6:37:23categorize that as a project that is one
- 6:37:25of the things that it
- 6:37:27recommends okay so is it accurate to say
- 6:37:30that this this document represents a
- 6:37:33request for
- 6:37:34information yes okay but within this
- 6:37:39document there is not a single defined
- 6:37:42uh Network Improvement project that you
- 6:37:44were recommending uh Lumen to undertake
- 6:37:47is there
- 6:37:48no and um Lumen did respond I'm sorry
- 6:37:52centry link did respond to this uh to to
- 6:37:55this input is that correct I believe so
- 6:37:58yes yeah and you you state your
- 6:38:00testimony that there was a response is
- 6:38:02that correct yes yeah and on page 15 of
- 6:38:06your testimony you you you quote from
- 6:38:08that response
- 6:38:16correct yes that is correct uh but you
- 6:38:19didn't attach the response why
- 6:38:27not I don't know okay um M fedo can you
- 6:38:32pull up exhibit uh 111 please and it is
- 6:38:35not confidential it's also and it is
- 6:38:53Mark and if you could reduce the scope a
- 6:38:55little bit there you go
- 6:38:59um this uh is this the uh this document
- 6:39:03I'll just readed to the record is
- 6:39:04entitled response of CR Corporation DBA
- 6:39:06Century Link QC to September 23 20123
- 6:39:11informal information request issued by
- 6:39:14Colorado Council of authorities Inc and
- 6:39:16others do you see that yes I do okay and
- 6:39:19uh is this the is this the document to
- 6:39:22which you were referring to as the
- 6:39:24Century Link response in your testimony
- 6:39:26yes it
- 6:39:27is and I won't go through in detail uh
- 6:39:31this document but um centry link did
- 6:39:34provide uh information uh
- 6:39:37to uh
- 6:39:39ccoa at least with regard to certain
- 6:39:43questions uh in this document is that
- 6:39:55correct I I am not sure okay uh perhaps
- 6:40:00we can scroll down uh this uh better we
- 6:40:03go maybe to um let's go to
- 6:40:06page
- 6:40:23sorry well we can start on page
- 6:40:26two um there's a request number one here
- 6:40:31um and this is do you understand these
- 6:40:32request to have been the uh the requests
- 6:40:36from CCA in the September
- 6:40:382023 um uh attachment uh Detachment
- 6:40:42three to your
- 6:40:58testimony I'm afraid I don't recall okay
- 6:41:01well I won't wa is
- 6:41:03as is Judge said stated earlier the
- 6:41:06documents will speak for themselves and
- 6:41:08I don't want to belabor this but um do
- 6:41:11you see that request or Lubin does have
- 6:41:13a response here underneath request
- 6:41:15number
- 6:41:16one I do see that yes okay and if we can
- 6:41:19scroll to the next page
- 6:41:23please um do you see additional requests
- 6:41:26here I do and do you see additional
- 6:41:29responses from secretary link I do okay
- 6:41:33um um so just to reiterate you would
- 6:41:36agree with me that cink did respond to
- 6:41:38the input provided by ccoa in advance of
- 6:41:42the filing of the second amended
- 6:41:44application I would okay i' move for
- 6:41:48admission of exhibit
- 6:41:50111 any objection to
- 6:41:53111 heing none 111 shall be
- 6:42:00admitted and I don't have any further
- 6:42:02questions thank you for your time this
- 6:42:04afternoon Mr
- 6:42:06Damron Mr Damron I got just a couple for
- 6:42:09you the same kind of ones I heard Miss
- 6:42:11kulpit uh and I'll just do it real
- 6:42:13quickly um are any of the projects
- 6:42:15proposed by uh Sentry Link should I
- 6:42:17approve any of them it is the position
- 6:42:20of the 20 authorities represented by
- 6:42:23ccoa that they should not be approved
- 6:42:26okay um could you point me and I forgot
- 6:42:29to ask Miss Culp this one can you point
- 6:42:30me to any um projected CA
- 6:42:34uh that is out of line that that causes
- 6:42:37great you know problems when you look at
- 6:42:39it as an
- 6:42:42estimate what I would point you to is uh
- 6:42:46what has been discussed I think at
- 6:42:48length in this hearing is the the lack
- 6:42:51of um transparency in how those costs
- 6:42:54were derived um and how that conflicts
- 6:42:58with the fiduciary responsibility that
- 6:43:00we have as authorities to our ratee
- 6:43:02payers
- 6:43:04well they they List cost for for
- 6:43:06instance the cost of of putting the
- 6:43:07fiber in in certain places is there
- 6:43:09anything in that estimate that that you
- 6:43:12look at and go my God it can't cost that
- 6:43:13much there there it's way too much is
- 6:43:15there anything like that that strikes
- 6:43:17you is out of line uh I do not have the
- 6:43:20requisite subject matter expertise to to
- 6:43:22know what a market value would be for
- 6:43:24those okay but you've not been told of
- 6:43:26any in your discussions with with others
- 6:43:29or anything like that you can't point me
- 6:43:30in any direction that way correct
- 6:43:34no sir okay
- 6:43:37um do you think that um if those costs
- 6:43:41are not out of way out of line if they
- 6:43:45in fact were were within a reasonable
- 6:43:46amount do you think the 911 system in
- 6:43:48Colorado would be better with these
- 6:43:57projects I believe the answer to that
- 6:43:59question is one of matter of degrees
- 6:44:02while the these improvements uh May
- 6:44:05improve the system what what is at issue
- 6:44:09From cca's perspective is is this the
- 6:44:12best use of rate rate payer funds and
- 6:44:15will this provide the best uh
- 6:44:18Improvement possible um when there are
- 6:44:22perhaps lower hanging fruit and more
- 6:44:25impactful improvements that could be
- 6:44:27made uh if if the uh the Colorado 911
- 6:44:31authorities and century link uh we able
- 6:44:34to uh find a bit more of a collaborative
- 6:44:37working relationship okay but you
- 6:44:39realize my choices are not this or
- 6:44:41something else my choices are this or
- 6:44:43nothing yes sir I understand that and so
- 6:44:47if I say no to this we're back to the
- 6:44:48drawing board and we're not starting
- 6:44:50until
- 6:44:532026 and so do you feel good with none
- 6:44:56of these projects or any projects for
- 6:44:58that matter it it is the position of of
- 6:45:01the 20 author ities represented by ccoa
- 6:45:04that that yes we are better off not
- 6:45:07approving these
- 6:45:08projects but the 911 system would better
- 6:45:10not doing anything until at least
- 6:45:132026 when compared to the projects as
- 6:45:17proposed yes sir all right that's all I
- 6:45:21have uh any
- 6:45:25redirect no redirect Jor all right Mr
- 6:45:28Daman thank you very much thank you for
- 6:45:30waiting around thank you for taking the
- 6:45:31questions do very much appreci
- 6:45:32appreciate that and you may you may go
- 6:45:35on your way or you can hang out if you
- 6:45:36want to all up to
- 6:45:39you all right uh staff with their
- 6:45:43witness Mr
- 6:45:44Cox thanks your honor um staff calls
- 6:45:47Jennifer Kirkland to the stand I'm Miss
- 6:45:49Kirkland you raise your right hand for
- 6:45:50me do you swear a firm and tell the
- 6:45:52whole truth nothing but the truth under
- 6:45:53penalty of perjury I do all right Mr Cox
- 6:45:56you go right ahead good afternoon Mrs
- 6:45:59Kirkland um could you please State and
- 6:46:02spell your name for the record good
- 6:46:04afternoon my name is Jennifer Kirkland k
- 6:46:06i r k l a n
- 6:46:09d and by whom are you employed in in
- 6:46:12what capacity I'm employed by the state
- 6:46:14of Colorado uh division of regulatory
- 6:46:16agencies in the Pu as the state 911
- 6:46:19program
- 6:46:21manager did you cause to be filed answer
- 6:46:23testimony including exhibits in this
- 6:46:26proceeding on June 12th um which has
- 6:46:29been marked as hearing exhibit 400
- 6:46:34did and if I asked you the questions
- 6:46:36that are contained in your answer
- 6:46:38testimony um would your answers be the
- 6:46:40same today they
- 6:46:42would staff moves to admit hearing
- 6:46:45exhibit 200 and its
- 6:46:48attachments I think he meant 400 but uh
- 6:46:51excuse me 400
- 6:46:53yes any objection to
- 6:46:55400 hearing none 400 shall be admitted
- 6:46:59and 200 for too but I don't think there
- 6:47:00is one thank you for
- 6:47:04that um and Mrs Kirkland are you
- 6:47:07familiar with the uh latest revised cost
- 6:47:10information um which we've talked about
- 6:47:14today um they've been marked as
- 6:47:16attachments
- 6:47:17SD 1C rev 2 and
- 6:47:21sd4 rev 2 to hearing exhibit 101 um as
- 6:47:25well as the uh additional cost
- 6:47:27information that was just adopted as
- 6:47:29exhibits by U century Link in their
- 6:47:35redirect yes I'm
- 6:47:37familiar and has that revised cost
- 6:47:40information and that additional cost
- 6:47:44information that was contained in those
- 6:47:46attachments and Exhibits changed your
- 6:47:48recommendations regarding the projects
- 6:47:51no it has not uh please
- 6:47:54explain the documentation that's been
- 6:47:58provided uh gives additional Clarity
- 6:48:02into
- 6:48:03why Century Link provided them there are
- 6:48:06still gaps in understanding what exactly
- 6:48:10those costs pertain
- 6:48:14to for
- 6:48:16example um in the documentation the
- 6:48:19number
- 6:48:21$551 has been referenced a couple of
- 6:48:24times this
- 6:48:25afternoon I there is still no clarity as
- 6:48:28to what piece of equipment that figure
- 6:48:31refers to so there's a lack of clarity
- 6:48:34as to what equipment would be placed at
- 6:48:36each paap in order to achieve that
- 6:48:40project end and that's just one
- 6:48:44example thank you Mrs Kirkland um your
- 6:48:47honor Mrs Kirkland is available for
- 6:48:49cross Andor your questions all right
- 6:48:52thank you Sentry Link any
- 6:48:58cross thanks judge good afternoon Miss
- 6:49:00Kirkman how are you I am well how how
- 6:49:02are you good good thank you um so um you
- 6:49:08gave uh I I believe in your testimony
- 6:49:11you had you had challenged you you
- 6:49:14challenged the project on the basis of
- 6:49:16lack of adequate cost information is
- 6:49:17that correct that's correct okay and and
- 6:49:21I think one of the um one of the areas
- 6:49:24in which uh you had uh challenged uh uh
- 6:49:29the ethernet project was in the lack of
- 6:49:31cost support
- 6:49:33for the um for for for quotes from third
- 6:49:38parties is that
- 6:49:41correct among others yes okay um I'm
- 6:49:45just going to break down you know and
- 6:49:48try to get a feel for exactly what what
- 6:49:50you feel like is adequately cost
- 6:49:51supported at this point and what's still
- 6:49:53remaining um based on the the doc the
- 6:49:57exhibits uh that were produced to you
- 6:49:59and and shown today to Mr Carlson
- 6:50:01regarding uh
- 6:50:03costs provided by uh third parties
- 6:50:06Comcast and gtt concerning non-recurring
- 6:50:09and recurring charges associated with
- 6:50:11the ethernet upgrade are you still do
- 6:50:14you still believe that that at least
- 6:50:16those elements lack adequate cost
- 6:50:19support yes okay um what additional cost
- 6:50:24information do you believe it would be
- 6:50:26necessary in order to support the gtt
- 6:50:29and uh Comcast
- 6:50:34charges which document do you want to
- 6:50:38work with for your question sure um one
- 6:50:42of I'd like to keep us I
- 6:50:45guess without getting into confidential
- 6:50:48material
- 6:50:51um there were um you recall when we
- 6:50:55looked
- 6:50:57at
- 6:50:58um hearing exhibit 101 attachment sd1 C
- 6:51:03which was the uh the list of the uh the
- 6:51:08wire centers associated with the
- 6:51:10ethernet upgrade you recall that yes I
- 6:51:12do okay and do you recall that in
- 6:51:15connection with that exhibit um centry
- 6:51:18link had
- 6:51:20identified
- 6:51:21um essentially non-recurring lease
- 6:51:25charges that that they had received from
- 6:51:30third parties
- 6:51:33yes okay and and in particular without
- 6:51:35pulling up the exhibit I'm talking about
- 6:51:37the uh column that we that had that was
- 6:51:41uh
- 6:51:42identified as um additional cap was that
- 6:51:51right no the I'm sorry third cost third
- 6:51:54party lease cost NRC it's the far right
- 6:51:57far column on the left on the right I'm
- 6:52:00sorry do you see that you're talking
- 6:52:02about about the yellow the far right
- 6:52:03yellow column yeah well the far right
- 6:52:07um orange column I was I was talking
- 6:52:11about I see that column okay um
- 6:52:17now Mr Carlson testified that the costs
- 6:52:21in that column were supported by the
- 6:52:25email quotes we that Century Link
- 6:52:27received from GT and Comcast was that
- 6:52:31your understanding
- 6:52:33I understand that's what he's testified
- 6:52:34to yes okay and and what what is it
- 6:52:37about the emails and his testimony that
- 6:52:40still leads you to believe that he is
- 6:52:42not that we Sentry Link is not
- 6:52:44adequately supported the costs uh
- 6:52:46reflected in that column I don't see
- 6:52:49adequate documentation from those
- 6:52:51third-party emails that support the
- 6:52:54costs listed in those columns or that
- 6:52:58line up with each of these psaps costs
- 6:53:05okay
- 6:53:06um well let me start first with do do
- 6:53:09you question the legitimacy of the costs
- 6:53:11that uh were included in the Comcast and
- 6:53:15gtt um
- 6:53:18emails it's not a question of legitimacy
- 6:53:21it's more a question of transparency and
- 6:53:25Clarity
- 6:53:27okay
- 6:53:29so um are you if if C link were to match
- 6:53:35the costs in those emails um in some
- 6:53:39fashion with the cost that we see in
- 6:53:41that third party lease cost NRC would
- 6:53:44that alleviate your concerns as to the
- 6:53:47adequacy of the cost
- 6:53:52support I would have to see what Sentry
- 6:53:55Link produces in order to answer that
- 6:53:56question
- 6:53:57appropriately okay have you undertaken
- 6:54:02uh
- 6:54:03an exercise in uh attempting to link the
- 6:54:07costs provided in those emails to um the
- 6:54:11costs that are represented on you know
- 6:54:13exhibit 101 attachment
- 6:54:18s1c yes I have spent much time in that
- 6:54:22exercise okay uh were you able to
- 6:54:25confirm that the uh costs in the third
- 6:54:29party lease cost NRC column were also
- 6:54:32supported by the emails that were U Mark
- 6:54:35into evidence earlier here
- 6:54:37today I was unable to confirm that okay
- 6:54:42um were there can you give us an idea
- 6:54:45for how many of the costs in that column
- 6:54:47you were unable to trace to those emails
- 6:54:50was it a few was it a lot all
- 6:55:02I would prefer to work in specifics so
- 6:55:07if you could point to a
- 6:55:10specific email that you would like to
- 6:55:12ask question about in regards to this
- 6:55:15document I'm happy to answer that sure
- 6:55:19um well um I'd prefer to work in having
- 6:55:23you identify a specific cost that you
- 6:55:26believe wasn't supported so why don't we
- 6:55:28do it the other way around um if you
- 6:55:31have uh this document in front of you
- 6:55:36again it's attachment
- 6:55:38101 uh I'm sorry exhibit 101 attachment
- 6:55:42sd1 C uh we'll start perhaps just with
- 6:55:46the the
- 6:55:49lamosa uh wire Center here uh there's a
- 6:55:53provider I identified in the second row
- 6:55:55is gtt do you see that I see that okay
- 6:55:59and there's a third party cost uh
- 6:56:01identified there uh for that particular
- 6:56:05uh NRC do you see that I see that okay
- 6:56:08and I'm not going to read it into the
- 6:56:09record because we are not in the
- 6:56:12confidential portion of this testimony
- 6:56:14but um were you or were you not able to
- 6:56:18tie that number in the row for gtt to
- 6:56:22the gtt emails that we were looked at
- 6:56:25earlier well I haven't memorized the
- 6:56:28emails specifically and so without
- 6:56:30pulling up that document
- 6:56:34uh I am unable to answer that question
- 6:56:36specifically okay is there um a single
- 6:56:41cost in that column third party lease
- 6:56:44cost NRC column that you can tell us
- 6:56:49right now under oath that you know is
- 6:56:52not supported by the emails that were
- 6:56:55marked into evidence earlier to
- 6:56:58that without looking specifically at it
- 6:57:01not at this time
- 6:57:03okay and let me ask you the same let's
- 6:57:06let's move over um two two rows so we're
- 6:57:10the third row from the I'm sorry two
- 6:57:12columns we the third column from the end
- 6:57:14it's the third party lease cost
- 6:57:18MRC access column do you see that I see
- 6:57:22that okay and I'll just ask you the same
- 6:57:24question is there a single cost
- 6:57:27reflected in that column for the third
- 6:57:30party carrier that you know uh is not
- 6:57:34supported by any of the emails that were
- 6:57:36marked into evidence earlier
- 6:57:38today it's staff's position that monthly
- 6:57:41recurring cost should not be considered
- 6:57:44as part of this
- 6:57:46proceeding okay so I by not by by
- 6:57:50answering the question in that fashion
- 6:57:51am I to assume that you did not
- 6:57:53undertake the analysis as to whether or
- 6:57:55not the costs in that column were
- 6:57:57supported by the emails that were
- 6:57:59admitted into evidence earlier today
- 6:58:02I spent less time on the monthly
- 6:58:05recurring
- 6:58:07costs because it's our stat it's our
- 6:58:10position that that should not be
- 6:58:12considered as part of this proceeding
- 6:58:14okay so I'll come back and ask the
- 6:58:16question that I asked two questions ago
- 6:58:19again and ask you to answer it this time
- 6:58:21is there a single cost in the column
- 6:58:24marked third party least cost MRC access
- 6:58:27that you know is not supported uh by any
- 6:58:30of the emails that were marked into
- 6:58:32evidence earlier
- 6:58:34today not at this time
- 6:58:40okay um
- 6:58:43and let me turn to the cost that you did
- 6:58:46identify um as lacking support it was
- 6:58:49the
- 6:58:51$551 in Capital Equipment cost is that
- 6:58:54correct yes okay is that the only cost
- 6:58:59uh on this spreadsheet that you believe
- 6:59:03lacks um cost
- 6:59:09support sorry I'm just looking at the
- 6:59:28spreadsheet can you ask ask the question
- 6:59:31again please sure is that the only
- 6:59:33category of costs in uh uh reflected on
- 6:59:37the spreadsheet that you know is you sit
- 6:59:40here today and lack cost
- 6:59:48support at this time yes
- 6:59:52okay
- 6:59:55um let me move on um off
- 6:59:58costs um and judge I know we're getting
- 7:00:01close to five um I probably just have I
- 7:00:05don't know 10 minutes maybe um so just
- 7:00:08for timing I don't know if we want to
- 7:00:09try to squeeze all this in today and
- 7:00:11finish or diver you the group well I
- 7:00:14yeah when you were done I was going to
- 7:00:16try and figure that out I'd like to what
- 7:00:18I might do is take a break at five for
- 7:00:19about 10 minutes and then finish up I
- 7:00:21there shouldn't be a whole lot more by
- 7:00:24by anyone we should be able to get done
- 7:00:26in the next about 40 minutes I already
- 7:00:27talked to my court reporter and Mr
- 7:00:29Federico and they are always nice to me
- 7:00:32so they said they would hang around so
- 7:00:34uh why don't you finish up and then
- 7:00:36we'll take a quick break and then
- 7:00:37hopefully finish it all up thanks Jud
- 7:00:40okay uh Miss KET um in your testimony um
- 7:00:43you uh oppose uh approval of the cida
- 7:00:48Howard route is that correct that is
- 7:00:50correct okay and um one of the reasons
- 7:00:55you oppose uh approval of that route is
- 7:00:58because um The Proposal was to replace
- 7:01:01EX existing uh uh copper um facilities
- 7:01:06is that
- 7:01:07right yes that's one of the reasons okay
- 7:01:11um now would you agree with me that
- 7:01:13fiber optic cable is uh much more
- 7:01:16reliable and capable of uh handling
- 7:01:19higher capacity um applications than
- 7:01:22copper yes okay and and if one of the
- 7:01:26goals of the uh Network Improvement
- 7:01:30rules is to increase U
- 7:01:33reliability um and functionality of the
- 7:01:36bsp network would you agree that uh a
- 7:01:39replacement of copper with fiber would
- 7:01:42be a way to accomplish that goal that is
- 7:01:45one way
- 7:01:52yes let me
- 7:01:55uh turn your attention then to the
- 7:01:58subject you had raised earlier about the
- 7:02:00uh about the uh the the Tariff um so can
- 7:02:04you explain to us I know it's in your
- 7:02:05testimony but can you explain to us why
- 7:02:08staff believes that it's in appropriate
- 7:02:10to approve a an MRC in this
- 7:02:15proceeding yes the monthly recurring
- 7:02:18charge as part of the Tariff is required
- 7:02:23to be filed as a tariff update or an
- 7:02:27amendment to the Tariff and while I
- 7:02:30believe it's appropriate it to raise
- 7:02:33the need or the necessity as part of
- 7:02:37this proceeding uh so that all parties
- 7:02:40can be aware that if these if this
- 7:02:43particular project is approved then
- 7:02:45there will be an Associated monthly
- 7:02:46recurring charge the approval of a
- 7:02:49monthly recurring charge should occur
- 7:02:51elsewhere and separate from this
- 7:02:55proceeding do you see uh the that there
- 7:02:59could be a risk um to everyone if um the
- 7:03:05ethernet upgrade project were approved
- 7:03:09uh without certainty that there would be
- 7:03:11a monthly recurring charge uh ultimately
- 7:03:14approved to go along with
- 7:03:17it I see that there's a risk but I also
- 7:03:20see that there is process for
- 7:03:23communication to take place between the
- 7:03:25two proceedings in order to ensure that
- 7:03:28Sentry Link would not incur undue risk
- 7:03:39judge could uh we hold on just I just
- 7:03:41want to talk to my client here for 15
- 7:03:43seconds to see if there's anything more
- 7:03:44and then I'll come right back Abol okay
- 7:03:59sure okay M Kirkland thank you very much
- 7:04:02for your analysis and time this
- 7:04:04afternoon we don't have any more
- 7:04:06questions right uh old do you still want
- 7:04:09to ask any questions Miss
- 7:04:10Kirkland I do your honor how much how
- 7:04:13are you going to use are you planning on
- 7:04:15using 20 minutes worth oh I don't think
- 7:04:17so maybe 10 okay I tell you what let's
- 7:04:20take a about a 10 minute break till
- 7:04:23about 5:15 and then we'll do that get
- 7:04:26you can ask questions I just have a few
- 7:04:28questions won't be very long Mr Cox I
- 7:04:30not going to hold you do this are you
- 7:04:31anticipating very long on a on a
- 7:04:33redirect at this point uh no hopefully
- 7:04:36it shouldn't be very long okay uh let's
- 7:04:38do that and probably be about 30 minutes
- 7:04:40or so we can get done today and not come
- 7:04:42back tomorrow for 30 minutes so uh let G
- 7:04:45give my court reporter a little bit
- 7:04:46break and we'll come back at
- 7:05:0055
- 7:05:30e
- 7:06:00e
- 7:06:30e
- 7:07:00e
- 7:07:30e
- 7:08:00e
- 7:08:30e
- 7:09:00e
- 7:09:30e
- 7:10:00e
- 7:10:30e
- 7:11:00e
- 7:11:30e
- 7:12:00e
- 7:12:30e
- 7:13:00e
- 7:13:30e
- 7:14:00e
- 7:14:30e
- 7:14:59e
- 7:15:29e
- 7:15:59e
- 7:16:29e e
- 7:17:02all right let's go back on the record
- 7:17:04make sure Tracy can hear me Tracy can
- 7:17:06hear me I can hear you okay uh let's go
- 7:17:10back on the record for City number 23
- 7:17:12a-01
- 7:17:1597t um again thank you everyone for
- 7:17:17hanging around hopefully we can get this
- 7:17:19done here today and not have to get up
- 7:17:21early tomorrow uh M Kirkland I will
- 7:17:24remind you that you are still under oath
- 7:17:26miss olar you may start any
- 7:17:28cross-examination that you have
- 7:17:32uh thank you your
- 7:17:33honor
- 7:17:38um Miss Kirkland I kind of want to go
- 7:17:40back to a topic that Mr Schneider
- 7:17:42covered in depth and to do so I would
- 7:17:45ask that we pull up hearing exhibit 100
- 7:17:49at page 16 which is not a confidential
- 7:17:51document
- 7:18:04if we could scroll down to uh line nine
- 7:18:07in the chart that follows below that
- 7:18:09thank you um Miss Kirkland have you seen
- 7:18:14these project details before that are
- 7:18:16contained within hearing exhibit
- 7:18:18100 yes and is it your understanding
- 7:18:21that the buildin region those 25 P apps
- 7:18:25and then the EC onet augment required uh
- 7:18:30pie apps and there are 10 those all
- 7:18:32require a piece of
- 7:18:34equipment is that your understanding yes
- 7:18:38and so those 35 P apps have you seen a
- 7:18:42quote of Century Link ordering
- 7:18:4535
- 7:18:49something I have
- 7:18:51not and so if you haven't seen a quote
- 7:18:54you don't know if the
- 7:18:57$551 figure includes a volume discount
- 7:19:01judge I'm sorry i' object um this
- 7:19:04appears to be friendly
- 7:19:06cross-examination and uh I don't think
- 7:19:08that's prohib allowed in the commission
- 7:19:09rules yeah I really wasn't sure what
- 7:19:11you're going to be doing with this uh
- 7:19:13this cross-examination honestly which is
- 7:19:15why I asked if you had any but well let
- 7:19:17me ask it this way are you asking that
- 7:19:21any project be approved with 6% overhead
- 7:19:25costs Jud
- 7:19:28again I'm sorry go ahead
- 7:19:31oh please by all means go
- 7:19:33ahead no go ahead Jennifer I'm sorry I
- 7:19:36didn't interrupt I'm sorry you didn't
- 7:19:38interrupt me you're in the middle of of
- 7:19:40of an objection there what's your
- 7:19:41objection I I I again I believe it's uh
- 7:19:44friendly cross but I guess I'll let it
- 7:19:46develop a little bit more okay all right
- 7:19:48that's fine we can answer the question
- 7:19:52will you ask the question again please
- 7:19:54do you believe that any of the projects
- 7:19:56that are proposed should be approved
- 7:19:59with 6% added on for
- 7:20:04overhead I believe that the if any
- 7:20:07projects are approved that the costs
- 7:20:10involved in that should be clearly
- 7:20:16understood do you clearly understand the
- 7:20:18overhead costs associated with any of
- 7:20:21the projects proposed in the second
- 7:20:23amended application no I do not have a
- 7:20:26clear understanding of the overhead
- 7:20:29costs um Council asked you and this is
- 7:20:33cross about um the Comcast quotes and
- 7:20:38the GT quotes my question to you is did
- 7:20:43you ever see a conflict where there was
- 7:20:45a quote for the same location between
- 7:20:48Comcast and
- 7:20:50GT and the higher number was chosen for
- 7:20:53purposes of Century Links projects judge
- 7:20:56again that's that's certainly friendly
- 7:20:58cross if she's uh setting the table here
- 7:21:01for uh a testimony from a witness to
- 7:21:05indicate that Sentry Link has improperly
- 7:21:08calculated costs yeah I'm GNA agree with
- 7:21:12that and move it
- 7:21:26along your recommendation to the
- 7:21:29administrative log of and the Public
- 7:21:32Utilities Commission ultimately is that
- 7:21:34these projects be approved subject to
- 7:21:37providing additional information do I
- 7:21:40understand that correctly yes you did
- 7:21:43not have the benefit of cca's answer
- 7:21:46testimony when you filed staff's answer
- 7:21:48testimony have you had the opportunity
- 7:21:51to review cca's answer testimony yes I
- 7:21:55have and your recommendations have not
- 7:21:59changed is that correct
- 7:22:01that's correct so where uh
- 7:22:05earlier there was testimony about any
- 7:22:09projects that aren't approved we have to
- 7:22:10go back come back in two
- 7:22:12years there's historic precedent for
- 7:22:16withdrawal of an improvement plan and
- 7:22:18coming back a year later
- 7:22:21true this is the first Improvement plan
- 7:22:24that's been proposed under the new rules
- 7:22:26that require it so I'm not sure what
- 7:22:28you're asking yeah 2023 did Century Link
- 7:22:32propose an improvement plan subject to
- 7:22:35ntia funding for three middle mile fiber
- 7:22:37builds toing $17
- 7:22:41million yes and they withdrew that
- 7:22:45correct
- 7:22:48they they tried to withdraw that and
- 7:22:51this proceeding is still
- 7:22:52open because the uh parties asked the
- 7:22:57judge to keep it open so that we could
- 7:22:59be here discussing this Improvement plan
- 7:23:02that we're talking about today correct
- 7:23:05and the 2024 Improvement plan that was
- 7:23:07filed on February 15
- 7:23:102024 Bears no resemblance to the first
- 7:23:13plan submitted in 2023
- 7:23:19correct there's resemblance in that it's
- 7:23:21in the same proceeding and some of the
- 7:23:24same projects which project is the
- 7:23:28same without comparing the two to I
- 7:23:30would not be able to answer that why is
- 7:23:33that relevant it's 5 o' why is that
- 7:23:36relevant um your honor I think it's
- 7:23:39relevant to um the big picture here but
- 7:23:42I will move
- 7:23:44along
- 7:23:47um with respect to your recommendation
- 7:23:50that the projects be approved with
- 7:23:54condition that additional information be
- 7:23:56provided later what how do you envision
- 7:23:58that process going
- 7:24:02when I couldn't say that for
- 7:24:05sure it's up to centry link to provide
- 7:24:08the information that is requested and
- 7:24:10it's up to centry link to provide
- 7:24:11adequate documentation for all parties
- 7:24:14involved to determine whether or not the
- 7:24:17costs that they have put forth are
- 7:24:21adequately
- 7:24:23supported staff does not share cca's
- 7:24:26concerns that some of these improvements
- 7:24:28are for the OSP network is that
- 7:24:35correct I have concerns about what the
- 7:24:39costs are that they have put out and
- 7:24:42what they have provided for
- 7:24:44documentation or lack
- 7:24:46thereof so the answer is no staff does
- 7:24:49not have concerns that some of these
- 7:24:51projects benefit the OSP
- 7:24:54Network staff doesn't have clarity as to
- 7:24:57which pieces would benefit the OSP
- 7:24:59Network versus the 911 Network and what
- 7:25:02costs are associated with
- 7:25:08each so does staff not have sufficient
- 7:25:11information for purposes of rule
- 7:25:142143b whether 100% of the cost should be
- 7:25:19allocated to 911 versus the commercial
- 7:25:24side of the business
- 7:25:31can you ask it again Sure Staff lacks
- 7:25:35sufficient information to take a
- 7:25:37position on whether 100% of the costs of
- 7:25:40a proposed project should be borne by
- 7:25:43911 versus a portion or all born by the
- 7:25:47commercial side of centry Le
- 7:25:49business staff lacks additional or
- 7:25:52sufficient information to determine
- 7:25:54whether the projects proposed would
- 7:25:57benefit osps versus bees
- 7:26:18um is there anything in the rules that
- 7:26:21would
- 7:26:22prohibit um if to your
- 7:26:26knowledge if this application was denied
- 7:26:30in full or withdrawn Century Link from
- 7:26:34coming
- 7:26:35back on or before February of 2025 with
- 7:26:38a different plan I'm to just object on
- 7:26:42foundation and asking a legal question
- 7:26:44of lay witness I and I don't think it's
- 7:26:46really relevant put that one on there
- 7:26:48too um that's the way it goes I think
- 7:26:51what you're going at M M old is the the
- 7:26:54the two-year deal but it wouldn't be
- 7:26:56going forward until 2026 so yeah I'm
- 7:26:59going I'm G sustain the
- 7:27:02objection I have no further question J
- 7:27:04all right um actually hit on the one
- 7:27:08thing that I was going to ask you about
- 7:27:10Miss Kirkman real quickly
- 7:27:13um in my review of it all but one of the
- 7:27:16projects uh staff and I say is a
- 7:27:19qualified in favor of is that correct
- 7:27:22that's correct um but I mean I think I'm
- 7:27:25stuck by the
- 7:27:28fact in in its current form
- 7:27:30form would staff recommend going forward
- 7:27:34with these projects with me approving
- 7:27:35the projects with the current
- 7:27:36information
- 7:27:38there with the current information
- 7:27:40everything that's been provided I think
- 7:27:42there's still a lack of clarity as to
- 7:27:44what the costs are and the documentation
- 7:27:46for those costs so my qualified approval
- 7:27:49is still there that yes I would like to
- 7:27:53see some of these projects go forward if
- 7:27:55the costs can be documented and
- 7:27:57supported and I haven't seen that
- 7:28:00but I mean I've got what I've got and
- 7:28:03and and you have what you have so based
- 7:28:05on its current form then you would say
- 7:28:07that I should not approve
- 7:28:09it I because I don't think I can approve
- 7:28:11it and say Hey you gotta file more stuff
- 7:28:14because be kind of a conditional
- 7:28:15approval and um I mean I think I'm stuck
- 7:28:19I'm all or
- 7:28:20nothing I understand uh I haven't seen
- 7:28:24documentation that would make me
- 7:28:26comfortable saying yes let's move
- 7:28:28forward unfortunately
- 7:28:31all right that's all I have any
- 7:28:36redirect yeah just a couple of questions
- 7:28:38your
- 7:28:39honor uh Mrs Kirkland uh Mr Snider
- 7:28:42talked to you about the the cost quotes
- 7:28:45uh that were introduced today um and
- 7:28:48these are for the last mile projects um
- 7:28:52are there differences in the the cost
- 7:28:53information in those quotes versus the
- 7:28:56cost
- 7:28:58information that was provided in and the
- 7:29:01other fiber build projects like the
- 7:29:03Idaho Springs Central City and CID
- 7:29:06Howard fiber build
- 7:29:08projects yes um in those fiber build
- 7:29:11projects the io Springs in Central City
- 7:29:14there was a costing tool provided which
- 7:29:16provided some clarity as to what the
- 7:29:19total cost of the fiber build was going
- 7:29:21to be for example uh fiber uh foot uh
- 7:29:26per foot um the specific pieces uh that
- 7:29:31go into building fiber such as um the
- 7:29:35pulling of Theo pulling of the fiber etc
- 7:29:37etc in exhibit
- 7:29:39108 uh in contrast for the last mile
- 7:29:43diversity that exhibit provides numbers
- 7:29:46but it does not for example it provides
- 7:29:48a cost per foot but it doesn't provide
- 7:29:50any supporting documentation for what
- 7:29:53that cost per foot is and so there's a
- 7:29:56lack of clarity in those in that
- 7:29:58projects to say yes can understand where
- 7:30:01those costs are coming from and where
- 7:30:02those numbers are coming
- 7:30:05from and do those quotes address your
- 7:30:08concerns about the clarity of the 6%
- 7:30:10overhead and 15% Capital cost being
- 7:30:13added no no documentation that's
- 7:30:16provided that has been provided thus far
- 7:30:19addresses my concerns about what the 6%
- 7:30:23overhead covers and what the 15% Capital
- 7:30:26costs
- 7:30:28are and also talked to Mr Snider about
- 7:30:31um specifically about the cida Howard
- 7:30:34fiber build project um and you said that
- 7:30:38replacement was one way to create that
- 7:30:41increased uh
- 7:30:43resiliency um replacement of the current
- 7:30:49with with fiber um and you said that was
- 7:30:53one way what are the other ways well for
- 7:30:56example another way would be to explore
- 7:30:58the option of thirdparty fiber leases
- 7:31:01for fiber that's already in place and
- 7:31:04I've seen no documentation that Sentry
- 7:31:05Link explored that option as a more
- 7:31:09cost-effective way to get that diversity
- 7:31:11to the citizens of Colorado without
- 7:31:13doing an expensive fiber
- 7:31:16build and and so you didn't see and
- 7:31:19haven't heard from today anything in the
- 7:31:21testimony
- 7:31:23that that you know Century Link
- 7:31:26evaluated those Alternatives I have not
- 7:31:29seen anything like that
- 7:31:31yet no further questions your honor okay
- 7:31:34you know the great thing about being a
- 7:31:35judge as you can say I don't have any
- 7:31:37more questions and then you can sit
- 7:31:38around for 30 seconds and go hey you
- 7:31:40know I got another question so I I'll
- 7:31:42give you another chance Mr Cox but I got
- 7:31:43a couple more uh Miss Kirkland I
- 7:31:45apologize for not remembering them right
- 7:31:47away um but uh real quick uh there is
- 7:31:53there anything that you see in the in
- 7:31:55the in the uh proposed cost that that
- 7:31:59just you know you go man that just seems
- 7:32:02so wrong um that that that causes you to
- 7:32:06if they were saying the per foot for
- 7:32:08fiber and it was $10,000 per foot you'd
- 7:32:11go my God that can't be right you don't
- 7:32:13see anything like that do you or do you
- 7:32:15um I I'm not an engineer and uh I'm not
- 7:32:19in the business of of pulling fiber so
- 7:32:21no I don't see anything that stands out
- 7:32:23on its face however I don't see any
- 7:32:25documentation that says this is an
- 7:32:27industry standard either so I have
- 7:32:29nothing to compare it to okay I
- 7:32:33certainly if you heard my questions
- 7:32:34before I've got I've got wonders about
- 7:32:37Capital costs and I got wonders about uh
- 7:32:40whatever other question I was asking
- 7:32:41about there uh the other cost of holding
- 7:32:45whatever costs um but those exist don't
- 7:32:49they at least as far as you know I
- 7:32:52believe so yes so so whatever that cost
- 7:32:56may be
- 7:32:57correctly the cost exist
- 7:33:00yes fa statement okay yes um all right I
- 7:33:05think that's all I have Mr Cox do you
- 7:33:07have anything based upon my questions
- 7:33:09there and I apologize for that that's
- 7:33:11okay nothing further all righty uh M
- 7:33:14kland thank you the two people I feel
- 7:33:16the most sorry for are the first witness
- 7:33:17and the last witness because the first
- 7:33:19one never gets off the stand and the
- 7:33:21last one has to wait around all day and
- 7:33:22then no one ever really generally no one
- 7:33:24asks him any questions so uh I do
- 7:33:27appreciate you hanging around I do
- 7:33:28appreciate testimonies very help
- 7:33:30um but you are free to enjoy
- 7:33:335:30 thank you sir all righty um so that
- 7:33:39wraps everything up as far as our
- 7:33:43Witnesses um I have a few housekeeping
- 7:33:46things I need to take care of um I need
- 7:33:50we have the confidential copies of some
- 7:33:53exhibits but we need non-confidential
- 7:33:55ones filed um so Mr Snider if you could
- 7:33:58see the uh non-confidential filing of
- 7:34:01exhibit 102 103 105 106 and
- 7:34:06108 and M old if you can see to the
- 7:34:09filing of I believe it's 602 and
- 7:34:12603 um that were confidentially if you
- 7:34:15could um just file those in the
- 7:34:18proceeding that would be great
- 7:34:20[Music]
- 7:34:22um
- 7:34:24and I'll go through real quickly I have
- 7:34:27admitted exhibit 100 101 400
- 7:34:33600
- 7:34:34700 601 110 602 603 102 108 103 105 106
- 7:34:45111 I have administrative notice taken
- 7:34:48of 47 CFR
- 7:34:529.19
- 7:34:54A5 um administrative notice of Century
- 7:34:59Links finally on February 12th 2024 page
- 7:35:023 and four in proceeding 23
- 7:35:06r-05
- 7:35:0977t and um outage filing by commission
- 7:35:13staff um and proceeding 24
- 7:35:17m- uh I got 00 2T it's outage filing
- 7:35:232406 um if I've missed anything or you
- 7:35:26think something should have been
- 7:35:27admitted tell me that
- 7:35:32um your honor this is Tracy and I just
- 7:35:33want to there were two um outage
- 7:35:36investigations reports that were
- 7:35:38administratively noticed 2309 and
- 7:35:422314 I outage your filing I've got 2406
- 7:35:46and that's what I have 2406 2406 okay 23
- 7:35:512309 23 20 232 2311 2309
- 7:35:562314 were offered to be uh taken minut
- 7:35:59ministrative notice and that was denied
- 7:36:01gotcha thank you so um I think that was
- 7:36:06everything in there I am going to ask
- 7:36:08the part the sa of positions are due on
- 7:36:11July 1st which is not too long and I
- 7:36:14promise I will get right on a decision
- 7:36:15as quickly as I can um for your folks at
- 7:36:18Sentry Link I I do realize there's um a
- 7:36:22timeline we're going on I do realize I
- 7:36:24actually had a decision that I never saw
- 7:36:25go out which uh talked about the
- 7:36:28deadline going away
- 7:36:30um I'll will put that in the decision
- 7:36:32again so that is in this final decision
- 7:36:34so don't worry about that
- 7:36:37um I'm GNA ask that the parties though
- 7:36:40do me one favor um I didn't ask any of
- 7:36:43the witnesses this because I think this
- 7:36:44is a legal question and um I don't think
- 7:36:48they really could answer it too well but
- 7:36:50in your statements of position if you
- 7:36:51could address whether I have the ability
- 7:36:54to approve a permanent tariff so the the
- 7:36:57ethernet that ether net line line that
- 7:36:59we're talking about is going to have a
- 7:37:01permanent tariff filing on there and
- 7:37:03whether I can do that in this proceeding
- 7:37:05under uh 2143 or whether that has to be
- 7:37:08a a separate filing I'm not sure that I
- 7:37:10can so um if you think I can tell me why
- 7:37:13if you think I can't tell me why I can't
- 7:37:15uh I'd appreciate that be very helpful
- 7:37:17to
- 7:37:18me um and I
- 7:37:21think that is all I have Mr Snider I
- 7:37:24will start with you do you have anything
- 7:37:26further uh thank you I think you've
- 7:37:29covered all everything the only other
- 7:37:30question I would have would be the
- 7:37:31transcript and whether or not the
- 7:37:33position statements would be more
- 7:37:35helpful like this is a question to
- 7:37:37everybody if we ordered an expedited
- 7:37:40copy of the transcript split the costs
- 7:37:43and included testimony or if the
- 7:37:45consensus of the group I don't know if
- 7:37:46there's a normal protocol for pu or not
- 7:37:49uh perhaps the protocol would just be
- 7:37:51we'll just do this based on memory I you
- 7:37:55know I don't I don't ever write a
- 7:37:57statement of position
- 7:38:00so so I don't know I think my cor
- 7:38:02reporters like it if you order things
- 7:38:03expedited because they get more money
- 7:38:05but uh I don't know you can talk to the
- 7:38:08other parties if you want to split it or
- 7:38:09how quickly you talk to my co- reporters
- 7:38:11and um see about how quickly you can get
- 7:38:13it you got a fairly quick timeline on
- 7:38:15this so um obvious obviously if you're
- 7:38:18quoting things from a transcript it's
- 7:38:19going to be far more helpful to me than
- 7:38:22than relying on your memory um so for
- 7:38:26what that you know take that for what
- 7:38:27it's worth it's going to be a better sop
- 7:38:29probably if you're you're sing to a
- 7:38:32transcript
- 7:38:34um so okay I'll connect with the parties
- 7:38:38offline thank you yeah anything anything
- 7:38:42else not for me m
- 7:38:45old no your honor Mr Cox anyone
- 7:38:49else uh your honor since we have Tracy
- 7:38:52here if she just if she has an estimate
- 7:38:54at all on how long the transcript would
- 7:38:56take
- 7:39:01I will say it'll take a little bit
- 7:39:02longer because of all the confidential
- 7:39:03sessions that I have to piece out of it
- 7:39:06um but if you want to expedited ordered
- 7:39:07it that way and I will get it
- 7:39:12done but as of right now you're not sure
- 7:39:15how long that would take even with the
- 7:39:19expedited um I would need at least
- 7:39:23until I would say Friday Saturday would
- 7:39:27that give you all enough time to get to
- 7:39:29your sop's
- 7:39:30done I have other hearings this week I
- 7:39:34that's what I was looking
- 7:39:35at
- 7:39:40um yeah I got one I got a
- 7:39:44couple yeah I mean if that's the case I
- 7:39:46think I would ask for see if we could do
- 7:39:47a couple more days can we do till the
- 7:39:50third
- 7:39:51um Mr Snider you have any problem goes
- 7:39:54to the third I I don't I think the value
- 7:39:56of the transcript warrants the
- 7:39:58additional cup couple days well and I'm
- 7:40:01G to say if you want to if you want to
- 7:40:02make it longer than that you can too
- 7:40:05um if you want if you want if you want
- 7:40:08that whole big giant Fourth of July
- 7:40:09weekend to sit around reading the
- 7:40:11transcript you can make it the eth if
- 7:40:13you want because I guarantee if you get
- 7:40:14it to the third you get to me on the
- 7:40:15third I ain't gonna look at it till the
- 7:40:20eth so up to
- 7:40:24you yeah let's I I would if the parties
- 7:40:27are amenable to it I I I'd like to order
- 7:40:30the transcript to move the position
- 7:40:32statement to the third third to the
- 7:40:36eth oh uh eth I guess yeah I'm getting
- 7:40:39my clients the eth is every have a
- 7:40:41problem with moving it to the
- 7:40:45eth no objection okay okay we can move
- 7:40:49it to the eighth um like I say I if you
- 7:40:51get if you get it to me at six o'clock
- 7:40:52on the third I'm not going to look at it
- 7:40:55I'm not going to look at it so um keep
- 7:40:57it within 30 pages please don't go high
- 7:41:00in 30 I'll stop reading after
- 7:41:0330 um
- 7:41:06but I think that's it last call for any
- 7:41:10further questions or
- 7:41:13clarifications going once going
- 7:41:16twice all right thank you everyone thank
- 7:41:18you for the witnesses that are still
- 7:41:19here I do appreciate the testimony
- 7:41:21appreciate your time today um I do
- 7:41:23promise I will get this done and turned
- 7:41:25around as quickly as I can once those
- 7:41:26Sops do come in um thank thank you for
- 7:41:29getting us done today and everyone have
- 7:41:30a pleasant tonight and a hearing free
- 7:41:37tomorrow thank you thanks
- 7:41:58judge for
About this transcript
This page contains the full transcript of YouTube transcript (5_FS6yumSso) , generated from the public captions YouTube serves with the video. The transcript has 42,297 words across 6,716 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.
What you can do with it
Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.
Free YouTube transcript tool
YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.