  1. 0:00hello dear students welcome to device
  2. 0:02commercial management academy
  3. 0:04when we are discussing about budgets
  4. 0:07different types of budgets we have seen
  5. 0:09practically we have done flexible budget
  6. 0:12sales budget
  7. 0:13now today we'll see cash budget one of
  8. 0:16the important budget
  9. 0:18interesting sub interesting budget and
  10. 0:21also easy once if you understand simple
  11. 0:24whenever student i used to work out
  12. 0:27comfortably happily especially flexible
  13. 0:29budget and cash budget format is also
  14. 0:32easy
  15. 0:33cash budget do you know cash account
  16. 0:37we used to write all the receipts on the
  17. 0:39debit side and payments on the credit
  18. 0:41side single column cash book double
  19. 0:43column cash book triple column cash book
  20. 0:45all the receipts debit side
  21. 0:47payments credit side
  22. 0:49from receipts if you deduct
  23. 0:51payments you'll be getting closing
  24. 0:54balance
  25. 0:55with opening balance we used to start
  26. 0:57recollected
  27. 0:58same thing but only the thing is we are
  28. 1:00presenting
  29. 1:02in a budget way
  30. 1:03cash budget
  31. 1:05focus this problem
  32. 1:08you will understand only one problem you
  33. 1:10can understand very clearly i need your
  34. 1:13attention today right now let's enter
  35. 1:15into the problem before going to the
  36. 1:17problem let me show you the proforma
  37. 1:19so when we want to prepare cash budget
  38. 1:21this is the program how many months we
  39. 1:23have we want to prepare cash budget for
  40. 1:26a example three months i am taking
  41. 1:28particular
  42. 1:30three months april may june or january
  43. 1:32february march okay so four columns how
  44. 1:35many months you want that much month you
  45. 1:37can extend it okay
  46. 1:39cash budget now we have to start with
  47. 1:41opening
  48. 1:42balance of cash
  49. 1:44so we'll say opening balance of cash
  50. 1:47and we'll give a heading of receipts all
  51. 1:49the receipts will write
  52. 1:51okay
  53. 1:52every month will total up
  54. 1:54then payments all the payments under
  55. 1:57this column receipts under this column
  56. 2:00and payments payments also will total
  57. 2:03receipts minus payments will be the
  58. 2:06closing cash that closing cash what we
  59. 2:10are going to get that will be the
  60. 2:11opening cash of next month
  61. 2:14first year always they'll give you
  62. 2:16opening balance of cash
  63. 2:18but
  64. 2:19this year this month the clos opening
  65. 2:21balance will be this month's closing
  66. 2:24balance closing balance will be opening
  67. 2:27balance in the same way may month
  68. 2:29closing balance whatever you get that
  69. 2:31will be the opening balance of
  70. 2:34june month
  71. 2:36go getting it perform performance like
  72. 2:38this
  73. 2:39now let's see the problem the problem is
  74. 2:42given like this understand slowly
  75. 2:45read it slowly
  76. 2:48and
  77. 2:49see that what they have given and how we
  78. 2:52have to work out
  79. 2:53very coolly how to understand the
  80. 2:55problem now the problem is here a
  81. 2:57company expecting
  82. 2:59to have
  83. 3:0232 000 cash in hand
  84. 3:05on first april 2019 means opening cash
  85. 3:09in the month of april
  86. 3:12opening cash okay
  87. 3:14prepare cash budget for three months
  88. 3:17three months what are the months april
  89. 3:19to
  90. 3:20june
  91. 3:21april may june that is why in the format
  92. 3:25i have written april may june
  93. 3:28okay opening balance of cash april month
  94. 3:31it is given how much
  95. 3:33where it is 32 000 we can write it here
  96. 3:36directly 32 000 opening balance
  97. 3:43okay now rest of the problems see
  98. 3:46different uh transactions are given it's
  99. 3:49related to the cash account only
  100. 3:50something it may be receipt or payment
  101. 3:54say for example months are here total
  102. 3:56five months are given but we are going
  103. 3:57to prepare april may and june these
  104. 4:00three months only we are going to
  105. 4:01prepare right
  106. 4:03so february march is only information
  107. 4:07what is the information given sales
  108. 4:09sales means receipt
  109. 4:11just like cash book
  110. 4:13says cash book what do you where do you
  111. 4:15write sales debit sell because it is
  112. 4:17income
  113. 4:18it's income okay receipt
  114. 4:21purchases when you are purchasing it's a
  115. 4:23payment you are making payment so this
  116. 4:26is payment
  117. 4:28recipient sales will write
  118. 4:30purchases payment okay
  119. 4:33wages expenses both are payments both
  120. 4:36will comes in payment side
  121. 4:38am i clear
  122. 4:39so this we are going to do and
  123. 4:42additional information very important
  124. 4:44you need to understand store slowly what
  125. 4:46is additional information period of
  126. 4:49credit allowed by suppliers is two
  127. 4:51months
  128. 4:52credit period of credit to suppliers
  129. 4:57credit to suppliers means
  130. 4:59this is the transaction related to the
  131. 5:01purchases
  132. 5:03suppliers are related to the purchases
  133. 5:06this much knowledge you have i think
  134. 5:08okay
  135. 5:09so there is a adjustment so i have
  136. 5:11written a star mark
  137. 5:14credit allowed by suppliers is two
  138. 5:16months two months delay is there
  139. 5:19when we take the amount we have to be
  140. 5:20very careful i will show you anyway
  141. 5:21while working out the problem just
  142. 5:23remember there is an adjustment related
  143. 5:24to the purchases next one
  144. 5:2825 of the sales is for cash
  145. 5:30sales also there is an adjustment
  146. 5:33i'll put a star mark here
  147. 5:3525 percent 25 percent of the sales is
  148. 5:38for cash
  149. 5:40means 75 percent is credit okay
  150. 5:43and the period of credit credit means 75
  151. 5:46percent
  152. 5:49this period of credit
  153. 5:51allowed to customers for credit sales is
  154. 5:54one month
  155. 5:55means there is a delay of one month
  156. 5:58credit sales how much is credit sales 75
  157. 6:0225 is cash sales here
  158. 6:05everything is 25 percent cash sales will
  159. 6:07take
  160. 6:08and credit sales of
  161. 6:10one month delay 75 percent okay
  162. 6:14this is related to the sale second point
  163. 6:16next
  164. 6:18delay in payment of wages and expenses
  165. 6:20one month wages and expenses here also
  166. 6:23we have adjustment
  167. 6:24so there is a delay of one month
  168. 6:28remember this
  169. 6:29next one income tax through 2028 000 is
  170. 6:33to be paid in june 2019
  171. 6:37in the month of june only you have to
  172. 6:39pay the income tax
  173. 6:41not in all the months that's all this is
  174. 6:44extra one not related to the data what
  175. 6:46we have given we'll take it lastly
  176. 6:49now how do we start the problem slowly
  177. 6:51observe
  178. 6:53first thing is that opening cash we have
  179. 6:56already written 32 000 which is given
  180. 6:58over there
  181. 6:59next we'll see the sales
  182. 7:02sales is
  183. 7:04income receipt okay related to the sales
  184. 7:07what is the adjustment given
  185. 7:09ah period of credit allowed by suppliers
  186. 7:12now this is related to the purchases
  187. 7:15sales adjustment is here 25 of the sales
  188. 7:18is for cash
  189. 7:20we'll say cash sales under this receipts
  190. 7:22column
  191. 7:23cash sales
  192. 7:26it is 25 percent
  193. 7:30okay 25 percent on three months sales
  194. 7:34now this is 96 000 into
  195. 7:37uh 25 percent
  196. 7:4324 000
  197. 7:48are you understanding
  198. 7:50these three months we are taking
  199. 7:52uh 25 percent 96 000 into 25 percent
  200. 7:56you got this much in the same way one
  201. 7:58lakh into 25 percent
  202. 8:01one lakh into 25 percent is 25 000 only
  203. 8:03so i'll write here 25 000.
  204. 8:07in the same one lakh 20 000 into 25
  205. 8:09percent 1 lakh 20 thousand into
  206. 8:12twenty five percent thirty thousand
  207. 8:15thirty thousand i have written here
  208. 8:19up to here no doubt
  209. 8:21now coming to the credit sales credit
  210. 8:23sales are seventy five percent but
  211. 8:26allowed to the customers
  212. 8:28uh for the period of one month means one
  213. 8:30month delay is there first we'll write
  214. 8:33credit sales
  215. 8:4075 percent
  216. 8:42one month
  217. 8:45for our understanding i have written in
  218. 8:47the
  219. 8:48brackets 75 percent one month one month
  220. 8:51the delay is there
  221. 8:54means we want actually april
  222. 8:56april
  223. 8:58we are going to take it on
  224. 9:00march
  225. 9:02one month delay is there so that is why
  226. 9:05on 80 000
  227. 9:06will calculate 75 percent
  228. 9:10where can i show this calculations
  229. 9:11[Music]
  230. 9:13here
  231. 9:1580 000 into
  232. 9:19into 75 percent
  233. 9:25into 75 percent it is 60 000
  234. 9:30okay
  235. 9:31so 60 000 are the credit sales
  236. 9:37one month delay now so april we have
  237. 9:39taken for march
  238. 9:42and for may will take for april
  239. 9:45so this is
  240. 9:47march
  241. 9:50sorry april
  242. 9:52but we have taken one month before
  243. 9:55one month delay is there for
  244. 9:59may
  245. 10:02for may will take one month before
  246. 10:05one month delay is there no so we'll
  247. 10:07take april month ninety six thousand
  248. 10:10ninety six thousand into
  249. 10:12seventy five percent
  250. 10:2072 000
  251. 10:25so this is 72 000
  252. 10:30in the same way for the month of april
  253. 10:32may june now next june
  254. 10:35june also will take
  255. 10:37april month amount
  256. 10:39one month delays they know so sorry
  257. 10:42month
  258. 10:43june means we'll take for may month 1
  259. 10:45lakh
  260. 10:461 lakh into
  261. 10:4775 percent
  262. 10:50it is 75 000
  263. 10:5475 000 i am writing here
  264. 10:58you need to be very careful while
  265. 11:01calculation this calculation you must
  266. 11:03understand once again i'll explain
  267. 11:06see
  268. 11:0725 percent is cash sales
  269. 11:1025 percent cash sales means on all these
  270. 11:13ninety six thousand twenty five percent
  271. 11:15one like twenty five percent
  272. 11:17one like twenty thousand twenty five
  273. 11:18percent that we have calculated and we
  274. 11:20have written here twenty four twenty
  275. 11:22five thirty
  276. 11:24rest of the seventy five percent is that
  277. 11:25is the delay of one month
  278. 11:28delay of one month for april
  279. 11:31we have taken march amount eighty
  280. 11:34thousand into seventy five percent
  281. 11:37for may we have taken ninety six
  282. 11:39thousand for may ninety six thousand
  283. 11:40seventy five percent
  284. 11:42for june we have taken for may month
  285. 11:46month amount is one lakh one lakh into
  286. 11:48seventy five percent like this
  287. 11:50seventy five percent one month delay we
  288. 11:53have calculated and we have written over
  289. 11:55there
  290. 11:56so sales is over
  291. 11:59next one purchases
  292. 12:01related to the purchase also there is an
  293. 12:03adjustment what is that
  294. 12:05period of credit allowed by suppliers is
  295. 12:08two months
  296. 12:09delay of two months
  297. 12:11okay so now purchases comes under
  298. 12:14payments column so we'll write first
  299. 12:16purchases
  300. 12:22there is a delay of two months
  301. 12:27two months means april amount
  302. 12:30april amount purchases is here no april
  303. 12:33amount will take it forty four thousand
  304. 12:35two months delay is there if one month
  305. 12:37delay we could have taken fifty six
  306. 12:39thousand two months delay means forty
  307. 12:41four thousand okay forty four thousand
  308. 12:48april is over now for may month will
  309. 12:50take two months delay means fifty six
  310. 12:52thousand
  311. 12:57and for june month
  312. 12:59june month delay means two months delay
  313. 13:01sixty thousand will take
  314. 13:06it means two months delay is there means
  315. 13:08we have started taking from forty four
  316. 13:11thousand fifty six thousand and sixty
  317. 13:13thousand okay forty four fifty six sixty
  318. 13:16forty four fifty six sixty
  319. 13:18okay this is purchases are over next
  320. 13:21wages and expenses they said
  321. 13:24delay in payment of wages and expenses
  322. 13:26one month
  323. 13:27one month delay is there so wages and
  324. 13:30expenses are payments we'll write here
  325. 13:33wages
  326. 13:36one month delay
  327. 13:39and also
  328. 13:41expenses
  329. 13:46expenses also one month delay
  330. 13:51one month delay means april means will
  331. 13:53take nine thousand
  332. 14:00may means april's will take 9000
  333. 14:06and for june means one month delay means
  334. 14:0811 000
  335. 14:12in the same expenses expenses also there
  336. 14:15is a delay of one month right one month
  337. 14:17delay means
  338. 14:18for april month will take six thousand
  339. 14:25for may month will take seven thousand
  340. 14:28one month before we are taking
  341. 14:30seven thousand
  342. 14:33and uh for june we'll take nine thousand
  343. 14:39okay these four transactions we have
  344. 14:42taken out of these four transactions
  345. 14:44only only one is received that is sales
  346. 14:47sales cash sales 25 credit sales 75
  347. 14:51okay and uh purchases wages and expenses
  348. 14:54three are payments payments that we have
  349. 14:57written delay how much delay is there
  350. 14:59according to that posting which amount
  351. 15:01you have to take that you need to be
  352. 15:02very careful okay three transactions
  353. 15:05three adjustments are over now last one
  354. 15:07income tax 28 000 is to be paid in
  355. 15:10june
  356. 15:12income tax pay means payment side okay
  357. 15:15income tax
  358. 15:21income tax is how much 28 000 only in
  359. 15:24the month of june june means 28 000 here
  360. 15:27only will take
  361. 15:2928 000 in the month of june but not in
  362. 15:33rest of the months april june no
  363. 15:36over posting is over now we have to
  364. 15:38close each and every month carefully
  365. 15:41first what we'll do
  366. 15:42we'll
  367. 15:44see the total
  368. 15:46receipts
  369. 15:58total receipts if you see thirty two
  370. 16:01thousand
  371. 16:03plus twenty four thousand
  372. 16:06plus sixty thousand
  373. 16:09just one lakh sixteen thousand
  374. 16:16and here total payment
  375. 16:28total payment is here 44
  376. 16:309000
  377. 16:33plus
  378. 16:349000 six thousand
  379. 16:38it is fifty nine thousand okay
  380. 16:48now how do you get closing cash
  381. 16:501 lakh 16 000 minus 59 000
  382. 16:54so closing cash
  383. 17:00cash is
  384. 17:01[Music]
  385. 17:03i think you are understanding okay
  386. 17:06if i write 1 lakh 16 minus 59 000 for
  387. 17:09rest of the months it will be changing
  388. 17:11so
  389. 17:121 lakh 16 000 minus 59 000
  390. 17:19it is 57 000
  391. 17:3157 000 is the closing cash
  392. 17:35now this will be the opening cash of
  393. 17:38next month
  394. 17:39so opening cash is same one 57 000.
  395. 17:46now if you total the
  396. 17:48receipts 57 000 plus
  397. 17:5225 000
  398. 17:54plus 72 000
  399. 17:56it is one lakh fifty four thousand
  400. 18:02and payments
  401. 18:0656 000 plus
  402. 18:099 plus 7 16 000
  403. 18:13seventy two thousand
  404. 18:17how do you get the closing cash of me
  405. 18:19month
  406. 18:20receipts minus
  407. 18:22uh payments one lakh fifty four thousand
  408. 18:25minus
  409. 18:26seventy two 000
  410. 18:3082 000
  411. 18:32so this is closing cash in the month of
  412. 18:35may
  413. 18:36so this will be the opening cash in the
  414. 18:38month of june 82 000 will write here
  415. 18:45now if you total this
  416. 18:48eighty two thousand plus
  417. 18:50thirty one lakh five thousand you can
  418. 18:52take directly
  419. 18:55one like eighty seven thousand
  420. 19:02and this total
  421. 19:04sixty plus eleven seventy one thousand
  422. 19:07seventy one plus nine
  423. 19:09eighty thousand
  424. 19:11eighty plus
  425. 19:12twenty eight thousand one lakh eight
  426. 19:14thousand
  427. 19:19anyway let me check it once
  428. 19:22seventy one thousand plus
  429. 19:26nine thousand plus twenty eight thousand
  430. 19:30yeah one lakh eight thousand now the
  431. 19:32difference between these two
  432. 19:34one lakh eighty seven thousand minus
  433. 19:37one lakh
  434. 19:38eight thousand it is seventy nine
  435. 19:40thousand
  436. 19:45so
  437. 19:46that's it cash budget is over
  438. 19:49every month how much you are having
  439. 19:51opening balance how many
  440. 19:53receipts are there
  441. 19:55and
  442. 19:56how many payments are there at the end
  443. 19:59of the month how much is the closing
  444. 20:00balance you got it very clearly this is
  445. 20:03important
  446. 20:04every month april month you got receipts
  447. 20:07of this much
  448. 20:08and payments of this
  449. 20:11and end of the april you have balance of
  450. 20:1357 000. 57 000 you are transferring to
  451. 20:17the opening balance of next month may
  452. 20:20and may month
  453. 20:22total receipts and total payments so may
  454. 20:25month closing balance is 82 000. one
  455. 20:28lakh fifty four thousand minus seventy
  456. 20:30two thousand and this will be the
  457. 20:31opening balance of next june
  458. 20:34and june month the total receipts are
  459. 20:37this much payments are this much so
  460. 20:38closing balance is 79 000 that is one
  461. 20:41like 87 000 minus one like eight
  462. 20:43thousand that's all simple
  463. 20:45clear
  464. 20:47if you focus
  465. 20:48i think you can
  466. 20:49you understood it
  467. 20:51take a screenshot or pause the video and
  468. 20:53note down
  469. 21:01if you understood this problem
  470. 21:04i can say that cash budget is easy
  471. 21:07you're perfect you can work out any
  472. 21:09problem
  473. 21:10more or less a little bit adjustments
  474. 21:12are the proforma you understood how to
  475. 21:14post it and how to
  476. 21:17focus on the adjustments everything is
  477. 21:19you got it
  478. 21:21if possible
  479. 21:22you see the problem
  480. 21:24work out it once and second time without
  481. 21:27looking at the answer you try to work
  482. 21:29out take out your test book start
  483. 21:32working out more problems if you
  484. 21:34understood it your confidence will
  485. 21:36develop a lot
  486. 21:37stay connected check out the playlist
  487. 21:40or description box for more subjects and
  488. 21:43please don't forget to forward these
  489. 21:45videos practice well good luck

About this transcript

This page contains the full transcript of 21. "Cash Budget - Problem No: 1" from Managerial/ Management Accounting Subject by Devika's Commerce & Management Academy, generated from the public captions YouTube serves with the video. The transcript has 2,536 words across 489 segments, with the original timestamps preserved so you can click any line to jump to that moment in the embedded player.

What you can do with it

Use the transcript to take notes, quote the speaker, build a study guide, generate a summary with ChatGPT or Claude via the YouTube Summary tool, or export it as a timed subtitle file with YouTube to SRT. You can also re-open it in the transcriber to translate the transcript into 100+ languages.

Free YouTube transcript tool

YouTube2Text is a free YouTube transcript generator — no signup, no daily limit. Paste any YouTube link and get the full transcript instantly, with timestamps, click-to-jump, translation to 100+ languages, AI prompts for ChatGPT, Claude, and Gemini, and exports to TXT, SRT, VTT, or Markdown.